  1. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs.

  2. The Take Action Project

    ERIC Educational Resources Information Center

    Boudreau, Sue

    2010-01-01

    The Take Action Project (TAP) was created to help middle school students take informed and effective action on science-related issues. The seven steps of TAP ask students to (1) choose a science-related problem of interest to them, (2) research their problem, (3) select an action to take on the problem, (4) plan that action, (5) take action, (6)…

  3. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included.

  4. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    SciTech Connect

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  5. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project - status to date January 1998

    SciTech Connect

    1998-04-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments.

  6. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    SciTech Connect

    Sigmon, C.F.; Levine, M.B.

    1990-03-02

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab.

  7. Peer Observation Action Research Project

    ERIC Educational Resources Information Center

    Sandt, Fred-Ole

    2012-01-01

    This paper outlines the initial findings of an action research project that focuses on the possible contribution of peer observation to a more collaborative environment and teachers' professional growth at The University High School. The research component played a significant part as previous attempts to change the culture at the school were…

  8. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  9. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  10. Development of the chemical stabilization and solidification process for the treatment of radioactive raffinate sludges at the DOE Weldon Spring Site Remedial Action Project

    SciTech Connect

    Cole, P.M.; Kakaria, V. [Morrison Knudsen Corp., Boise, ID . Environmental Enger, J.

    1996-12-31

    Chemical Solidification and Stabilization (CSS) is the mixing of chemical reagents with waste to solidify and chemically stabilize the contaminated material. The resulting product is resistant to leaching of certain contaminants. CSS treatment using Class C fly ash and Portland cement was chosen as the most feasible method for treatment of the chemically and radioactively contaminated sludge (raffinate) contained in raffinate pits on the Weldon Spring Site Remedial Action Project (WSSRAP) located outside of St. Louis, Missouri. Due to the uniqueness of the material, substantial bench-scale testing was performed on the raffinate to better understand its properties. Similarly, due to mixed results in the application of CSS treatment to radioactive materials, a pilot-scale testing facility was built to verify bench testing results and to establish and quantify design parameters for the full-scale CSS production facility. This paper discusses the development of the pilot-scale testing facility, the testing plan, and the results of the testing activities. Particular attention has been given to the applicability of the CSS treatment method and to the value of pilot-scale testing.

  11. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  12. A Telecommunications-Infused Community Action Project.

    ERIC Educational Resources Information Center

    March, Thomas; Puma, Jessica

    1996-01-01

    The Nonprofit Prophets, a telecommunications-infused community action project, was designed for high school students. Students were teamed with a nonprofit organization and produced videoconferences or Web sites for them. Although specific skills were acquired, students also gained confidence and self-esteem as well as a belief that they…

  13. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their age may be…

  14. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  15. Volatile organic compound remedial action project

    SciTech Connect

    1991-12-01

    This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

  16. The Action-Project Method in Counseling Psychology

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav; Domene, Jose F.

    2005-01-01

    The qualitative action-project method is described as an appropriate and heuristic qualitative research method for use in counseling psychology. Action theory, which addresses human intentional, goal-directed action, project, and career, provides the conceptual framework for the method. Data gathering and analysis involve multiple procedures to…

  17. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  18. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  19. Critical Literacy for School Improvement: An Action Research Project

    ERIC Educational Resources Information Center

    Cooper, Karyn; White, Robert E.

    2008-01-01

    This article provides an overview of the integrative process of initiating an action research project on literacy for students "at risk" in a Canadian urban elementary school. As the article demonstrates, this requires development of a school-wide framework, which informs the action research project and desired outcomes, and a shared ownership of…

  20. An Action-Research Project: Community Lead Poisoning Prevention

    ERIC Educational Resources Information Center

    Rajaram, Shireen S.

    2007-01-01

    This action-research project focused on gathering data on awareness of lead poisoning, as well as disseminating information on lead poisoning prevention in a metropolitan midwestern city. This project reflects an action-research approach to service learning and was in collaboration with a grass-roots organization. This paper outlines the daunting…

  1. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  2. Administrative Leadership as Projection, Social Control, and Action.

    ERIC Educational Resources Information Center

    Reed, Donald B.

    Over the past 50 years, theoretical and methodological problems have plagued the study of leadership. This paper, proposing an alternative theory, argues that leadership has three fundamental components: projection and social control, which are linked by action. Projection is the visualization of a project to be completed. Educational…

  3. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  4. COST ESTIMATING SYSTEMS FOR REMEDIAL ACTION PROJECTS

    EPA Science Inventory

    This paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary micro-computer based cost estimating systems for hazardous waste remediations. he U.S. EPA system, "Remedial Action Cost Estimating System" (...

  5. Indigenizing Teacher Education: An Action Research Project

    ERIC Educational Resources Information Center

    Kitchen, Julian; Raynor, Marg

    2013-01-01

    This action research report focuses on a new elective course entitled "Indigenizing Education: Education for/about Aboriginal Peoples" that was developed and taught by two teacher educators--one Euro-Canadian and the other Metis. The purpose of the course was to increase understanding of Indigenous peoples and of the impact of…

  6. Project WILD--From Awareness to Action!

    ERIC Educational Resources Information Center

    Charles, Cheryl; Schafer, Rudy

    1984-01-01

    Discusses goals of Project WILD, an environmental and conservation program emphasizing wildlife. Includes instructions for using and sample of "dilemma cards" which allow students to read, discuss, make judgments, and write about hypothetical dilemmas concerning wildlife and/or natural resources. (BC)

  7. Project InterActions: A Multigenerational Robotic Learning Environment

    ERIC Educational Resources Information Center

    Bers, Marina U.

    2007-01-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both…

  8. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  9. Action Research Projects in Pre-Service Teacher Education

    ERIC Educational Resources Information Center

    Clayton, Courtney; Meadows, George

    2013-01-01

    Classroom-centered Action Research Projects are an integral component of the M.S. in Elementary Education Program at the University's (pseudonym) College of Education. This article provides a summary and discussion of the projects completed by students in the Science, Technology, Literacy and English Language Learner Specializations of the…

  10. Literacy Learning within Community Action Projects for Social Change

    ERIC Educational Resources Information Center

    Wright, Dana E.; Mahiri, Jabari

    2012-01-01

    This case study describes the literacy development of a struggling reader over a seven-month period as he engaged in a youth-led participatory action research (PAR) project. The project's goal was for youth participants to develop a proposal for productive change in their local community and present it to community stakeholders. The study focused…

  11. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    PubMed

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects. PMID:16803932

  12. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  13. Development of a model for geomorphological assessment at U.S. DOE chemical/radioactive waste disposal facilities in the central and eastern United States; Weldon spring site remedial action project, Weldon Spring, Missouri

    SciTech Connect

    Rockaway, J.D.; Smith, R.J.

    1994-12-31

    Landform development and long-term geomorphic stability is the result of a complex interaction of a number of geomorphic processes. These processes may be highly variable in intensity and duration under different physiographic settings. This limitation has influenced the applicability of previous geomorphological stability assessments conducted in the arid or semi-arid western United States to site evaluations in more temperate and humid climates. The purpose of this study was to develop a model suitable for evaluating both long-term and short-term geomorphic processes which may impact landform stability and hence the stability of disposal facilities located in the central and eastern United States. The model developed for the geomorphological stability assessment at the Weldon Spring Site Remedial Action Project (WSSRAP) near St. Louis, Missouri, included an evaluation of existing landforms and consideration of the impact of both long-term and short-term geomorphic processes. These parameters were evaluated with respect to their impact and contribution to three assessment criteria considered most important with respect to the stability analysis; evaluation of landform age, evaluation of present geomorphic process activity and ; determination of the impact of the completed facility on existing geomorphic processes. The geomorphological assessment at the Weldon Spring site indicated that the facility is located in an area of excellent geomorphic stability. The only geomorphic process determined to have a potential detrimental effect on long-term facility performance is an extension of the drainage network. A program of mitigating measures has been proposed to minimize the impact that future gully extension could have on the integrity of the facility.

  14. Play and Literacy: A Collaborative Action Research Project in Preschool

    ERIC Educational Resources Information Center

    Einarsdottir, Johanna

    2014-01-01

    The article describes a collaborative action research in a preschool in Reykjavik. The participants were two preschool teachers who collaborated with researchers at the University of Iceland. The project was set up as a professional development course for the teachers. Emphasis was placed on continuity in children's education, integration of…

  15. An Action Learning Project on Diversity: Pitfalls and Possibilities.

    ERIC Educational Resources Information Center

    Hite, Linda M.

    1997-01-01

    In a college course on diversity in the workplace, students' experiences with conducting a cultural audit of the university as a workplace illustrate the dilemmas that can arise when students conduct action research in a real client system. Despite the inherent problems, the project resulted in significant student learning about the subject and…

  16. Culminating Experience Action Research Projects, Volume 3, Spring 2003.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    This document presents the course syllabus for Education 590 Culminating Experience at the University of Tennessee at Chattanooga's teacher licensure program. It also includes action research projects from spring 2003: "'To Track or Untrack...That Is the Question'" (Sarah Armes); "Providing Urban Students with the Motivation to Succeed in School"…

  17. Strategic Approaches to Practice: An Action Research Project

    ERIC Educational Resources Information Center

    Burwell, Kim; Shipton, Matthew

    2013-01-01

    The importance of personal practice for instrumentalists and vocalists is well established among researchers, and axiomatic for practitioners. This paper reports on a phase of an action research project, investigating student approaches to personal practice. Following a preliminary questionnaire study, a residential clinic was conducted by…

  18. Blogging across the Curriculum: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Andrea

    2012-01-01

    "Blogging across the curriculum: Integrating blogging in the elementary classroom" is an Action Research Project that sought to explore the level of engagement in the writing process by students in grades 3, 4 & 5 while blogging across the curriculum. Blogging took place in homeroom classrooms as well as in the school's math, science and…

  19. Slipping Pages through Razor Wire: Literacy Action Projects in Jail

    ERIC Educational Resources Information Center

    Jacobi, Tobi

    2008-01-01

    This essay explores the intersection between writing studies and civic engagement through the action projects developed in E465: Prison Literature and Writing. Such literacy activism creates immediate opportunities for advanced undergraduates to more fully understand the work of literacy in contested spaces like jail and extends a call to action…

  20. Project ASSIST: Action Strategies for Implementing Social Transition.

    ERIC Educational Resources Information Center

    Urban League of Greater New Orleans, LA.

    Project ASSIST (Action Strategies for Implementing Social Transition) is an attempt to assess the needs, concerns, problems, strengths, and preferences of low income area residents within the city of New Orleans by developing primary based data. This report presents the findings of two major surveys, in which 1,306 households in eight low income…

  1. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  2. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  3. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  4. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  5. Culminating Experience Action Research Projects, Volume 7, Fall 2005

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  6. Culminating Experience Action Research Projects, Volume 10, Spring 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  7. Culminating Experience Action Research Projects, Volume 5, Spring 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  8. Culminating Experience Action Research Projects, Volume 14, Spring 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  9. Culminating Experience Action Research Projects, Volume 13, Fall 2008

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  10. Culminating Experience Action Research Projects, Volume 17, Fall 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 5900 Culminating…

  11. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  12. Culminating Experience Action Research Projects, Volume 9, Fall 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Ezell, Benjamin T., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  13. Culminating Experience Action Research Projects, Volume 11, Fall 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  14. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  15. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  16. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse

    PubMed Central

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  17. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    PubMed

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  18. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  19. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  20. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  1. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  2. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  3. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  4. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  5. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  6. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  7. California Freshwater Shrimp Project: An Eco-Action Project with Real Life Learning.

    ERIC Educational Resources Information Center

    Rogers, Laurette H.

    The California Freshwater Shrimp Project is an example of a student-initiated, eco-action project. Students, from a fourth grade class in the Ross Valley School District in San Rafael, California, were linked to their community and environment through their work in rehabilitating habitat and educating the public. The paper gives an overview of a…

  8. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  9. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  10. Project InterActions: A Multigenerational Robotic Learning Environment

    NASA Astrophysics Data System (ADS)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  11. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  12. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  13. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  14. Project Charter (MSA-143). [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-07-01

    Public Law 95-604, The Uranium Mill Tailings Radiation Control Act of 1978'' as amended assigns to DOE, other Federal agencies, and involved States and Indian tribes, responsibilities for remedial actions at 22 inactive uranium mill tailings sites listed in the Act, and for any other sites designated by the Secretary prior to November 8, 1979. The objective of the UMTRA Project is to provide remedial action at the mill tailings sites and associated vicinity properties in order to stabilize and control the tailings in a safe and environmentally sound manner and to eliminate potential health hazards caused by residual levels of uranium decay products that exceed EPA standards. A total of 24 uranium mill tailings sites. This Project Charter delineates the respective responsibilities and authorities of (The Office of Nuclear Energy) (NE) and (Albuquerque Operations Office) (AL), and defines the terms and conditions for management of the UMTRA Project. Supplementary Project management documents which have been and are being developed pursuant to this Charter include a Project Plan (PP), a Project Management Plan (PMP) and other plans governing the accomplishment of the Project mission Evolution of the program will require updates of the Project Plan and Project Management Plan.

  15. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    NASA Astrophysics Data System (ADS)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  16. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  17. The Older Person's Handbook. Ideas, Projects and Resources for Neighborhood Action. A Mutual Aid Project Handbook.

    ERIC Educational Resources Information Center

    Cala, Michael; And Others

    The Mutual Aid Project (MAP) has developed a community organizing and planning approach which has focused its attention on the continuing role of older people within their neighborhoods. This approach has sought to strengthen not only the day-to-day arrangements for mutual aid and support, but also those actions which will assist groups in…

  18. Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties

    SciTech Connect

    Not Available

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

  19. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  20. Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-01-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

  1. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  2. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  3. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  4. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  5. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    SciTech Connect

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

  6. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    SciTech Connect

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-02-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded.

  7. Action Research and Teacher Thinking: The First Phase of the Action Research on Action Research Project at the University of Wisconsin--Madison.

    ERIC Educational Resources Information Center

    Noffke, Susan E.; Zeichner, Kenneth M.

    This report on action research projects conducted by student teachers as a part of their preservice teacher preparation program focuses on how action research improves the understanding of educational practices by the practitioner-researchers themselves. Two major topics are discussed. First, specific types of claims about the impact of action…

  8. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  9. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-94, I-894, and U.S. Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin. Those actions grant.... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project...

  10. Reshaping Literacy in a High Poverty Early Childhood Classroom: One Teacher's Action Research Project

    ERIC Educational Resources Information Center

    Rose, Lynnette; Vaughn, Margaret; Taylor, Linda

    2015-01-01

    This research explores an action research project conducted by the first author focused on supporting her preschool students' literacy and language development. Using observations, interviews, artifacts, and assessment, this research documents the first author's process of conducting an action research project over the course of one year to…

  11. Moving beyond Consultation and into Action with a Client Project

    ERIC Educational Resources Information Center

    Ewing, Sara; Dover, Howard F.

    2012-01-01

    Attempting to implement client-based projects within a single semester often overwhelms students and underwhelms the client and grading professor. In this paper, we share results from a two-year pilot project in which the components of a client project were split between several classes. We discuss the client project model as a valuable teaching…

  12. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-09-01

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.

  13. 77 FR 34456 - Notice of Final Federal Agency Actions on the Newberg Dundee Bypass Project Project: Yamhill and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...: Notice of Limitations on Claims for Judicial Review of Actions by FHWA. SUMMARY: This notice announces... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 10, 2012. If the Federal law that authorizes judicial review of...

  14. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  15. Multiple Intelligences Theory, Action Research, and Teacher Professional Development: The Irish MI Project

    ERIC Educational Resources Information Center

    Hanafin, Joan

    2014-01-01

    This paper presents findings from an action research project that investigated the application of Multiple Intelligences (MI) theory in classrooms and schools. It shows how MI theory was used in the project as a basis for suggestions to generate classroom practices; how participating teachers evaluated the project; and how teachers responded to…

  16. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... Department of Transportation, US 41 Brown County Project Office, 1940 West Mason Street, Green Bay, Wisconsin... approvals for the following highway project: US 41 (Memorial Drive to County M), Brown County,...

  17. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  18. The Federal Art Project: Holger Cahill's Program of Action.

    ERIC Educational Resources Information Center

    Mavigliano, George J.

    1984-01-01

    Under the directorship of Holger Cahill, who drew upon John Dewey's principle of the universal communicability of art, the Federal Art Project of the Great Depression era gave all of the people the opportunity to study and enjoy art. Specific programs of the project are described. (RM)

  19. Children's Ideas about Animal Adaptations: An Action Research Project

    ERIC Educational Resources Information Center

    Endreny, Anna Henderson

    2006-01-01

    In this paper, I describe the action research I conducted in my third-grade science classrooms over the course of two years. In order to gain an understanding of my third-grade students' ideas about animal adaptations and how the teaching of a unit on crayfish influenced these ideas, I used clinical interviews, observations, and written…

  20. Action Research Projects in Distance Education: A Manual.

    ERIC Educational Resources Information Center

    Ramakrishna, C. Pushpa; Prasad, V. S.

    This manual, prepared by the Distance Education Council (India) presents guidelines for action research in distance education, balancing practical research activities with a sound theoretical research base. Chapter 1, "Scope, Purpose and Design of the Manual," suggests several definitions of research; draws distinctions between academic research…

  1. Enhancing Students' Creative Writing Skills: An Action Research Project

    ERIC Educational Resources Information Center

    Nasir, Laraib; Naqvi, Syeda Meenoo; Bhamani, Shelina

    2013-01-01

    This research aimed to improve written expression (composition) skills of 5th grade students of an elite private school. The research was designed under the paradigm of action research. A total sample of 39 students' from the same grade was chosen for the study. The baseline assessment was carried out to explore the pre-intervention writing skill…

  2. Using Action Research Projects to Examine Teacher Technology Integration Practices

    ERIC Educational Resources Information Center

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  3. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  4. Corrective action investigation plan for Project Shoal Area CAU No. 416

    SciTech Connect

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  5. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  6. The Constant Cycle: Day to Day Critical Action of the QUIPPED Project

    ERIC Educational Resources Information Center

    Medves, Jennifer M.; Paterson, Margo; Schroder, Cori; Verma, Sarita; Broers, Teresa; Chapman, Christine; O'Riordan, Anne

    2008-01-01

    Action research in the critical paradigm involves a process of continual refection in and on action including the research process itself. In the second in a series of several papers we report on the day-to-day management of the QUIPPED project. The aim was to facilitate patient centred care through inter-professional collaboration with health…

  7. Critical Literacy Practices, Social Action Projects, and the Reader Who Struggles in School

    ERIC Educational Resources Information Center

    Bauer, Courtney Marie

    2011-01-01

    This study, conducted at an urban public school, explored the engagements of five, fourth grade, African American students who struggled with reading in school as they participated in critical literacy practices and social action projects with the assumption that critical analysis of written texts and concrete social actions were necessary for…

  8. Blended Learning and Teaching Writing: A Teacher Action Research Project

    ERIC Educational Resources Information Center

    Camahalan, Faye Marsha G.; Ruley, Andrea G.

    2014-01-01

    This teacher research project focused on utilizing blended learning to teach writing to middle school students. The intervention was designed to fit into individual lessons needed to improve students' writing skills with the main focus on sentence structure. Sixteen (16) 7th grade students were assessed with a writing sample applying the new…

  9. Integrated Quality Control Measurement Project. Findings and Corrective Actions.

    ERIC Educational Resources Information Center

    Price Waterhouse and Co., New York, NY.

    The Integrated Quality Control Measurement Project (IQCMP) of the U.S. Department of Education measured the quality of awards distributed during the 1988-89 award year under the three major Title IV programs: the Pell Grant program, the Campus-Based programs, and the Stafford Loan program, in order to evaluate and improve the quality of the…

  10. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... place of a minor natural gas pipeline (short segments of buried pipe of 6-inch inside diameter or less... disturbing activity or changes to project works or operation; (14) Exemptions for small conduit hydroelectric... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate...

  11. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  13. Activists and Writers: Student Expression in a Social Action Literacy Project

    ERIC Educational Resources Information Center

    Epstein, Shira Eve

    2010-01-01

    This article centers the stories of two eighth grade students in the context of a social action literacy project. Their teacher designed curriculum that scaffolded opportunities for them to address English language arts standards while speaking out for social change. The students' responses to the project reveal their civic literacy practices, as…

  14. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    ERIC Educational Resources Information Center

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  15. Learning about Democracy at School: An Action Research Project in Early Childhood Education

    ERIC Educational Resources Information Center

    Sánchez-Blanco, Concepción

    2015-01-01

    This article examines part of an action research project carried out in a Spanish public school. We explain the complex reality of an early childhood education classroom. Focusing on early childhood education, the project was developed in collaboration with a teacher from one of the classrooms of four year olds. Several of the children in the…

  16. Implementing an Action Research Project: A Case Study in Making Decisions and Managing Challenges

    ERIC Educational Resources Information Center

    Greenbank, Paul

    2013-01-01

    This paper examines the challenges involved in implementing an action research project. It discusses a project which uses a series of interventions (unfreezing techniques, cases studies in conjunction with analogical encoding and lecturer input) to encourage students to critically reflect on their approach to career decision-making. This paper…

  17. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  18. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  19. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  20. Full Circle: Stakeholders' Evaluation of a Collaborative Enquiry Action Research Literacy Project

    ERIC Educational Resources Information Center

    Forey, Gail; Firkins, Arthur S.; Sengupta, Sima

    2012-01-01

    This paper reports on school-university collaboration during an action research project, which aimed to build a writing pedagogy for students with Learning Disabilities in the trilingual, biliterate educational context of Hong Kong. The project was established through interpersonal relationships built from the ground up between stakeholders from a…

  1. Journeying between the Education and Hospital Zones in a Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Crow, Jayne; Smith, Lesley; Keenan, Iain

    2006-01-01

    The authors present their journey through the development of an action research project based on collaboration between university health lecturers and a practice development and research nurse in an NHS Trust hospital. The project was designed to raise awareness and improve the practice of all staff in relation to the dignity and respect shown to…

  2. With Hindsight: An Overview of the Autism Spectrum Disorder Participatory Action Research Project

    ERIC Educational Resources Information Center

    Curzon, Joanna

    2008-01-01

    Much has happened since nine teams across New Zealand engaged in a Ministry of Education-funded participatory action research project looking at effective practice for supporting children and young people with autism spectrum disorder (ASD) in education. Building on earlier discussions, the project ran from 2002 to 2004, and until now the story…

  3. UMTRA Ground Water Project management action process document

    SciTech Connect

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  4. Cost-estimating systems for remedial-action projects

    SciTech Connect

    Evans, G.M.; Peterson, J.

    1991-01-01

    The paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary microcomputer based cost estimating systems for hazardous waste remediations. The U.S. EPA system, Remedial Action Cost Estimating System (RACES), is a technology based application. Estimates generated by RACES are based upon cost engineering relationships. The estimates are designed for use in the early stages of remediation design. The U.S. Army Corps of Engineers system, Micro-Computer Aided Cost Engineering System (M-CACES), is a bottoms-up system for use in situations where detailed design information is available. While both systems will stand alone, they have been designed to allow the transfer of estimates generated by RACES directly into the M-CACES system.

  5. Environmental Response to Remedial Actions at the Weldon Spring Site--An Environmental Success Story

    SciTech Connect

    Meier, J. A.; Welton, T. D.

    2002-02-27

    Environmental remediation activities have been ongoing at the Weldon Spring Site for over a decade, beginning with small interim response actions and culminating in completion of surface cleanup as represented by closure of the 17 hectare (42-acre) on-site disposal cell. As remedial actions have incrementally been accomplished, the occurrence of site-related contaminants in on and off-site environmental media have effectively been reduced. The DOE-WSSRAP has demonstrated success through the effective reduction or elimination of site related water and airborne contaminants along multiple migration pathways. This paper briefly describes the remedial measures affected at Weldon Spring, and quantifies the environmental responses to those remedial measures.

  6. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992

    SciTech Connect

    Not Available

    1992-09-01

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.

  7. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  8. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  9. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  10. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  11. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  12. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  13. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan]. Revision 4

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  14. An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment

    ERIC Educational Resources Information Center

    McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin

    2011-01-01

    Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…

  15. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  16. Culminating Experience Action Research Projects, Volume 15, Part 2, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2009-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  17. Emerging Voices in a University Pen-Pal Project: Layers of Discovery in Action Research.

    ERIC Educational Resources Information Center

    Ceprano, Maria A.; Garan, Elaine M.

    1998-01-01

    Describes how a semester-long pen-pal project enabled 18 participating university language arts students, a class of first graders, their teacher, and the university instructors to become co-learners in meaningful, action research. Discusses insights about writing derived from the children's weekly letters. Presents an assessment rubric charting…

  18. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  19. The QUIPPED Project: Exploring Relevance and Rigor of Action Research Using Established Principles and Criteria

    ERIC Educational Resources Information Center

    Chapman, Christine; Paterson, Margo; Medves, Jennifer M.

    2011-01-01

    This paper is the last in a series of three manuscripts published in the TQR journal over the past few years. This work is part of a larger program of research that has been carried out by a team of researchers detailing various aspects of a three year action research project carried out from 2005 and 2008. This particular paper addresses issues…

  20. Participation, Roles and Processes in a Collaborative Action Research Project: A Reflexive Account of the Facilitator

    ERIC Educational Resources Information Center

    Avgitidou, Sofia

    2009-01-01

    This paper analyses and discusses the roles and participation of those involved in a collaborative action research project to highlight the factors that influenced their content, quality and intensity. Emphasis is given to the reflections of the facilitator (author) on the processes employed to achieve equal participation and roles in the action…

  1. Re-Placing the Arts in Elementary School Curricula: An Interdisciplinary, Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Trent, Allen; Riley, Jorge-Ayn

    2009-01-01

    This article describes a collaborative action research project aimed at deliberately "re-placing" art in the elementary curriculum through targeted planning, implementation, and assessment of an art integrated unit in an urban 4th grade classroom. Findings and implications should be relevant to elementary teachers, administrators, art specialists,…

  2. Culminating Experience Action Research Projects, Volume 16, Part 1, Spring 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  3. Clients, Colleagues or Experts? Defining Identities in an Action Research Project

    ERIC Educational Resources Information Center

    Coco, Angela; Varnier, Catherine; Deftereos, Chris

    2007-01-01

    This article examines how discourses shaped and were shaped by participants' identities in a participatory action research (PAR) project in a tertiary education environment. The primary researcher and the director of the university's desktop publishing team explored the idea of working together to help the newly formed team to develop strategies…

  4. I Play, Therefore I Am: An Undergraduate Philosophical Action Research Project.

    ERIC Educational Resources Information Center

    Stoll, Sharon Kay; Beller, Jennifer M.; Mathews, Allison; Matthews, Julie; Trainer, Maria; Freitas, Brandon; McLaughlin, Casey; Milke, Mary

    2000-01-01

    Asked undergraduate students' opinions of Descartes' belief that the mind and body are separate, then had them conduct action research projects examining whether the mind-body dilemma might be overcome if teachers valued the essential nature of play and applied it to sport and physical education. Results supported the hypothesis that physical…

  5. Culminating Experience Action Research Projects, Volume 15, Part 1, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  6. An Action Research Project's Impact on Teachers' Leadership Attitudes and Perceptions

    ERIC Educational Resources Information Center

    Myers, Nancy; Dillard, Benita R.

    2013-01-01

    California Lutheran University is a regional site for the California Reading and Literature Project (CRLP). In 2010, CRLP began a two-year longitudinal study to examine the effects of participating in an institute called Reframing Teacher Leadership: Action Research Study Group had on PreK-12 teachers' attitudes and perceptions. The…

  7. The Action--Reflection--Modelling (ARM) Pedagogical Approach for Teacher Education: A Malaysia-UK Project

    ERIC Educational Resources Information Center

    Jarvis, Joy; Dickerson, Claire; Thomas, Kit; Graham, Sally

    2014-01-01

    This article presents the Action--Reflection--Modelling (ARM) pedagogical approach for teacher education developed during a Malaysia-UK collaborative project to construct a Bachelor of Education (Honours) degree programme in Primary Mathematics, with English and Health and Physical Education as minor subjects. The degree programme was written…

  8. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  9. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... actions relate to a proposed highway and transit project within the Tier 1 Elgin O'Hare--West Bypass study... Elgin O'Hare Expressway on the west and located in Cook and DuPage Counties in Illinois just northwest... within the Elgin O'Hare--West Bypass study area in Cook and DuPage Counties in Illinois. Decisions in...

  10. Development of a Community of Science Teachers: Participation in a Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Fazio, Xavier

    2009-01-01

    This article presents a study exploring the beliefs, knowledge, and practices of four middle and secondary science teachers participating in a collaborative curriculum action research project. Using a case study methodology, the views and practices of these teachers were described and analyzed as they investigated novel ideas about scientific…

  11. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  12. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  13. A Leadership Project in Action: A Project Adventure New Zealand & Dunstan High School Initiative.

    ERIC Educational Resources Information Center

    Schusser, Eric

    1998-01-01

    The Leadership Project uses community partnerships to initiate a systematic response to drug and alcohol use, violence, and crime among teenagers in Alexandria, New Zealand. Aspects of the project include adventure-based violence intervention and counseling in the high school and leadership training at an outdoor education center. Preliminary…

  14. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  15. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  16. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  17. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  18. Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project

    SciTech Connect

    S. L. Reno

    2006-10-26

    This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

  19. Project Northland high school interventions: community action to reduce adolescent alcohol use.

    PubMed

    Perry, C L; Williams, C L; Komro, K A; Veblen-Mortenson, S; Forster, J L; Bernstein-Lachter, R; Pratt, L K; Dudovitz, B; Munson, K A; Farbakhsh, K; Finnegan, J; McGovern, P

    2000-02-01

    Project Northland is a randomized community trial initially implemented in 24 school districts and communities in northeastern Minnesota, with goals of delaying onset and reducing adolescent alcohol use using community-wide, multiyear, multiple interventions. The study targets the Class of 1998 from the 6th to 12th grades (1991-1998). The early adolescent phase of Project Northland has been completed, and reductions in the prevalence of alcohol use at the end of 8th grade were achieved. Phase II of Project Northland, targeting 11th- and 12th-grade students, uses five major strategies: (1) direct action community organizing methods to encourage citizens to reduce underage access to alcohol, (2) youth development involving high school students in youth action teams, (3) print media to support community organizing and youth action initiatives and communicate healthy norms about underage drinking (e.g., providing alcohol to minors is unacceptable), (4) parent education and involvement, and (5) a classroom-based curriculum for 11th-grade students. This article describes the background, design, implementation, and process measures of the intervention strategies for Phase II of Project Northland. PMID:10709791

  20. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  1. Toward Solutions: The Work of the Chemistry Action-Research Group. Learning in Science Project. Working Paper No. 35.

    ERIC Educational Resources Information Center

    Osborne, Roger; And Others

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Chemistry Action-Research Group considered problems related to the teaching and learning of ideas associated with particles and physical/chemical changes. Based on findings during the…

  2. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  3. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in... New York and New Jersey: Goethals Bridge Replacement Project. The Goethals Bridge provides a...

  4. Toward Solutions: The Work of the Physics Action-Research Group. Learning in Science Project. Working Paper No. 32.

    ERIC Educational Resources Information Center

    Osborne, Roger; Schollum, Brendan

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Physics action-research group considered problems related to the teaching and learning of ideas associated with force and motion, suggesting that children's ideas of these concepts might…

  5. Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  6. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  7. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  8. 2009 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2010-03-01

    This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.

  9. 2008 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA

  10. 2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2011-02-01

    This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.

  11. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    SciTech Connect

    Not Available

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

  12. Technical framework for groundwater restoration. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration.

  13. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities

    PubMed Central

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  14. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities.

    PubMed

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  15. The Dilemma of High Level Planning in Distributed Agile Software Projects: An Action Research Study in a Danish Bank

    NASA Astrophysics Data System (ADS)

    Svejvig, Per; Fladkjær Nielsen, Ann-Dorte

    The chapter reports on an action research study with the aim to design a high level planning process in distributed and co-located software projects based on agile methods. The main contributions are the insight that high level planning process is highly integrated with other project disciplines and specific steps has to be taken to apply the process in distributed projects; and the action research approach is indeed suitable to software process improvements.

  16. Adult Literacy Action Campaign: Projects around Australia. A Review of State and Territory Level Adult Literacy Projects Funded under the Adult Literacy Action Campaign of the National Policy on Languages. Occasional Paper Number 3.

    ERIC Educational Resources Information Center

    Australian Advisory Council on Languages and Multicultural Education, Canberra.

    This collection of papers is a review of the adult literacy projects in Australia funded under the 1987-89 Adult Literacy Action Campaign (ALAC) of the National Policy on Languages. Fourteen authors describe various literacy projects and, often, their outcomes. The projects described are grouped in seven areas. On the subject of Literacy Training…

  17. Yes, I Can: Action Projects To Resolve Equity Issues in Educational Computing. A Project of ECCO, the Educational Computer Consortium of Ohio.

    ERIC Educational Resources Information Center

    Fredman, Alice, Ed.

    This book presents reports on selected "local action" projects that were developed as part of the Equity in Technology Project, which was inaugurated in 1985 by the Educational Computer Consortium of Ohio (ECCO). The book is organized into three sections, one for each of the populations targeted by the project. An introduction by Alice Fredman…

  18. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  19. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    SciTech Connect

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification.

  20. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  1. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  2. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    NASA Astrophysics Data System (ADS)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  3. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  4. Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  5. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  6. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    SciTech Connect

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  7. 76 FR 45649 - Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Federal Highway Administration Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-5: Fern Valley... Administration, 530 Center Street, NE., Suite 420, Salem, Oregon 97301, Telephone: (503) 316-2559. The I-5:...

  8. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... (New NY Bridge) Project in New York, in the Federal Register at FR Doc. 2012-26799. Tappan Zee Hudson... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River...

  9. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road... project, OR 62: I-5 to Dutton Road (Medford) in Jackson County, Oregon. This action grants approval for...: (503) 231-6179. The OR62: I-5 to Dutton Road Environmental Impact Statement (EIS) is available...

  10. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  11. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  12. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  13. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  14. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  15. Oak Ridge background soils project provides data for remedial action evaluation

    SciTech Connect

    Watkins, D.R.; Lee, S.Y.; Hatmaker, T.L.; McGinn, C.W.; Nourse, B.D.; Schmoyer, R.L.; Burgoa, B.B.; Lietzke, D.A.

    1994-09-01

    Many constituents of potential concern for human health occur naturally at low concentrations in soils. The primary objective of the Background Soil Characterization Project (BSCP) was to provide fully validated and defensible, reservation-wide background concentration data on significant potential contaminants of concern (organics, inorganics, and radionuclides) in natural soils on the Oak Ridge Reservation (ORR). The data are particularly significant for remedial action projects; the data can be used to establish technical guidance and the basis for realistic cleanup requirements at hazardous waste sites on the reservation. Other objectives included providing baseline data for conducting contaminated site assessments and quantifying estimates of human health risk associated with background levels of potentially hazardous constituents in soils.

  16. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    SciTech Connect

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

  17. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded…

  18. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    SciTech Connect

    Findlay, Rick

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  19. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  20. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    ERIC Educational Resources Information Center

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  2. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    SciTech Connect

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

  3. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  4. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    SciTech Connect

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  5. Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites

    SciTech Connect

    Not Available

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

  6. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  7. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    PubMed Central

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  8. 2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

    SciTech Connect

    2013-03-01

    The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an

  9. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  10. A Synthesis and Application Teaching Approach for Group Projects in an Undergraduate Business Course: An Action Research Study

    ERIC Educational Resources Information Center

    Green, Laurena E.

    2009-01-01

    Scholars proposed it would be possible to enhance group effectiveness and functioning if people could develop a better appreciation of the processes surrounding group development (M. K. Smith, 2005). The action research study explored the facilitation of a synthesis and application teaching approach for group projects in the practice of two…

  11. Democratic Deliberations in the Finnish Elementary Classroom: The Dilemmas of Deliberations and the Teacher's Role in an Action Research Project

    ERIC Educational Resources Information Center

    Tammi, Tuure

    2013-01-01

    Finnish youth are found to be, despite their broad knowledge, uninterested in politics and in societal participation. As a remedy, international studies suggest enabling democratic experiences in schools. This article discusses an action research project aimed at developing deliberation-based democratic practice in an elementary classroom. Results…

  12. An Action Research Project to Determine the Utility of Bully Prevention in Positive Behavior Support for Elementary School Bullying Prevention

    ERIC Educational Resources Information Center

    Goodman-Scott, Emily; Doyle, Beth; Brott, Pamelia

    2014-01-01

    A trio of researchers presents a case study from a practical, participatory action research project to demonstrate how one school district implemented a school-wide bullying prevention initiative for all elementary schools based on Bully Prevention in Positive Behavior Support (BP-PBS). The purpose of this manuscript is to discuss the process of…

  13. Making Space for Democracy through Assessment and Feedback in Higher Education: Thoughts from an Action Research Project in Education Studies

    ERIC Educational Resources Information Center

    McDonnell, Jane; Curtis, Will

    2014-01-01

    This paper reports on an action research project into the development of a "democratic feedback model" with students on an education studies programme at a post-1992 university in the UK. Building on work that has explored the dialogic dimensions of assessment and feedback, the research explored the potential for more…

  14. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  15. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's…

  16. Collaborative Action Research and Project Work: Promising Practices for Developing Collaborative Inquiry among Early Childhood Preservice Teachers

    ERIC Educational Resources Information Center

    Moran, Mary Jane

    2007-01-01

    Excerpts from case studies of two preservice teaching teams exemplify a new approach for merging research and practice within an introductory early childhood methods course. Through participation in cycles of collaborative action research focused on the joint task of implementing long-term projects, preservice teachers evidenced change in the ways…

  17. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  18. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  19. A Life in the Community: An Action Research Project Promoting Citizenship for People with High Support Needs

    ERIC Educational Resources Information Center

    Swift, Paul; Mattingly, Molly

    2009-01-01

    Life in the Community is an action research project with three objectives: (1) To work with four organisations from the third sector to improve the daytime opportunities for up to 40 people with higher support needs and help them to be more included in the life of a community; (2) To develop the capacity of organisations in the not-for-profit…

  20. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs.

  1. Weldon Spring Site Remedial Action Project quarterly environmental data summary for second quarter 1998

    SciTech Connect

    1998-08-11

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the second quarter of 1998 is enclosed. The data presented constitutes the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the database during the second quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the database and KPA data are not merged into the regular database. All data received and verified during the second quarter were within a permissible range of variability, except for those listed. Above normal occurrences are cited for groundwater, air, and NPDES data. There were no above normal occurrences for springs or surface water. The attached tables present the most recent data for air and the data merged into the database during the second quarter 1998 for groundwater, NPDES, surface water, and springs.

  2. Spatial dynamics of action potentials estimated by dendritic Ca(2+) signals in insect projection neurons.

    PubMed

    Ogawa, Hiroto; Mitani, Ruriko

    2015-11-13

    The spatial dynamics of action potentials, including their propagation and the location of spike initiation zone (SIZ), are crucial for the computation of a single neuron. Compared with mammalian central neurons, the spike dynamics of invertebrate neurons remain relatively unknown. Thus, we examined the spike dynamics based on single spike-induced Ca(2+) signals in the dendrites of cricket mechanosensory projection neurons, known as giant interneurons (GIs). The Ca(2+) transients induced by a synaptically evoked single spike were larger than those induced by an antidromic spike, whereas subthreshold synaptic potentials caused no elevation of Ca(2+). These results indicate that synaptic activity enhances the dendritic Ca(2+) influx through voltage-gated Ca(2+) channels. Stimulation of the presynaptic sensory afferents ipsilateral to the recording site evoked a dendritic spike with higher amplitude than contralateral stimulation, thereby suggesting that alteration of the spike waveform resulted in synaptic enhancement of the dendritic Ca(2+) transients. The SIZ estimated from the spatial distribution of the difference in the Ca(2+) amplitude was distributed throughout the right and left dendritic branches across the primary neurite connecting them in GIs. PMID:26456645

  3. Searching for New Directions: Developing MA Action Research Project as a Tool for Teaching

    ERIC Educational Resources Information Center

    Lee, Young Ah; Wang, Ye

    2012-01-01

    Action research has been recognized as a useful professional development tool for teaching, but for inservice teachers, conducting action research can be challenging. Their learning about action research can be influenced by social situations--whether in an MA (Master of Arts) program or other professional development. The purpose of this…

  4. Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

    SciTech Connect

    Brown, S.H.

    2008-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at

  5. Antenatal screening for haemoglobinopathies in primary care: a whole system participatory action research project

    PubMed Central

    Thomas, Paul; Oni, Lola; Alli, Mabel; St Hilaire, Judith; Smith, Alma; Leavey, Conan; Banarsee, Ricky

    2005-01-01

    Background The usual system for antenatal screening for haemoglobinopathies permits termination only late in the second trimester of pregnancy. Aim To evaluate a system where pregnant women are screened in general practice, and to develop a model of care pathway or whole system research able to bring into view unexpected effects of health service innovation. Design of study A whole system participatory action research approach was used. Six purposefully chosen general practices screened women who attended with a new pregnancy. Data of gestational age of screening were compared with two control groups. Qualitative data were gathered through workshops, interviews and feedback to the project steering group. At facilitated annual workshops participants from all parts of the care pathway produced a consensus about the meaning of the data as a whole. Setting Six general practices in north London. Method A whole system participatory action research approach allowed stakeholders from throughout the care pathway to pilot the innovation and reflect on the meaning and significance of quantitative and qualitative data. Results The gestational age of screening in general practice was 4.1 weeks earlier (95% confidence interval (CI) = 3.41 to 4.68) than in hospital clinics (P<0.001), and 2.9 weeks earlier (95% CI = 2.07 to 3.65) than in community midwife clinics (P<0.001). However, only 35% of pregnant women in the study were screened in the practices. Changes required throughout the whole care pathway make wider implementation more difficult than at first realised. The cost within general practice is greater than initially appreciated owing to a perceived need to provide counselling about other issues at the same time. Practitioners considered that other ways of early screening should be explored, including preconceptual screening. The research approach was able to bring into view unexpected effects of the innovation, but health workers were unfamiliar with the participatory

  6. 78 FR 64593 - Notice of Final Federal Agency Actions on US 26: MP 49.20-MP 57.45 Project: Clackamas County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ...This notice announces final environmental actions taken by the FHWA, USACE, USFS, USF&WS, NMFS and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 26: MP 49.20-MP 57.45. This action grants approval for the...

  7. What Does It Mean to Be a Friendly Outsider? Critical Reflection on Finding a Role as an Action Researcher with Communities Developing Renewable Energy Projects

    ERIC Educational Resources Information Center

    Rogers, Jennifer; Convery, Ian; Simmons, Eunice; Weatherall, Andrew

    2012-01-01

    This paper is a reflective account exploring the value of using action research in a relatively new context in the United Kingdom; the development of community renewable-energy projects. There is a strong rationale for using action research in this setting due to the synergies between the principles and practice of action research and localised…

  8. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... notice announces actions taken by the FHWA and the USACE that are final within the meaning of 23 U.S.C... given that the USACE has taken final agency actions within the meaning of 23 U.S.C. Sec. 139(l)(1)...

  9. 1991 New Mexico economic impact study for the Uranium Mill Tailings Remedial Action Project, Ambrosia Lake, New Mexico, site

    SciTech Connect

    Not Available

    1991-06-01

    The University of New Mexico Bureau of Business and Economic Research completed an abbreviated cost-benefit analysis of the income and employment impact of the US Department of Energy (DOE) and contractor offices in Albuquerque. Since the Project Office will have a significant positive impact on the State`s economy (shown on Table 8), the impact is combined with the impact of remedial actions at the Ambrosia Lake site to highlight the cost-benefit of the entire Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project at the Ambrosia Lake site will generate $12.509 million in gross labor income in New Mexico between 1989 and 1994. This includes $1.161 million in federal tax revenue, $1.015 million in State personal income tax revenue, and seven thousand in local tax revenue. The UMTRA Project will generate the equivalent of 84 full-time jobs during the peak year of remedial action at Ambrosia Lake site. New Mexico`s total funding requirement for the UMTRA Project is estimated to be $2.963 million. The net economic benefit of the Ambrosia Lake portion of the UMTRA Project to New Mexico after the State`s share of the project`s cost, the federal income tax, and the $0.936 million income impact of the alternate use of the State funding are subtracted, will be $7.451 million between 1990 and 1994. In Fiscal Year 1990 the UMTRA Project DOE and contractor offices in Albuquerque directly employed 163 people. Another 78 jobs were also maintained in support of the industry sector and 166 jobs were also maintained in other sections of the New Mexico economy. It is estimated that $19 million dollars of income was generated and 1.949 million of State and local taxes were collected. The University of New Mexico study shows that for every dollar the State of New Mexico invests in the UMTRA Project, it will realize $95.05 in gross labor income. This corresponds to a net return on the States investment in the Project of $97.20 for every dollar invested.

  10. Colorado economic impact study on the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-11-12

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1993. To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are: Direct employment was estimated at 894 workers; An estimated 89 percent of all direct employment was local; Secondary employment resulting from remedial action at the active Colorado UMTRA Project sites and the Grand Junction vicinity property program is estimated at 546 workers. Total employment (direct and secondary) is estimated at 1440 workers for the period of study (July 1, 1992, to June 30, 1993). An estimated $24.1 million was paid in wages to UMTRA workers in Colorado during FY1993; Direct and secondary wage earnings were estimated at $39.9 million; Income tax payments to the state of Colorado were estimated at $843,400 during FY1993; The gross economic impact of UMTRA Project activities in the state of Colorado is estimated at $70 million during the 1-year study period; and the net economic benefit to the state of Colorado was estimated at $57.5 million, or $5.90 per dollar of funding provided by Colorado. This figure includes both direct and secondary benefits but does not include the impact of alternative uses of the state funding.

  11. Exploring teachers' beliefs and knowledge about scientific inquiry and the nature of science: A collaborative action research project

    NASA Astrophysics Data System (ADS)

    Fazio, Xavier Eric

    Science curriculum reform goals espouse the need to foster and support the development of scientific literacy in students. Two critical goals of scientific literacy are students' engagement in, and developing more realistic conceptions about scientific inquiry (SI) and the nature of science (NOS). In order to promote the learning of these curriculum emphases, teachers themselves must possess beliefs and knowledge supportive of them. Collaborative action research is a viable form of curriculum and teacher development that can be used to support teachers in developing the requisite beliefs and knowledge that can promote these scientific literacy goals. This research study used a collective case study methodology to describe and interpret the views and actions of four teachers participating in a collaborative action research project. I explored the teachers' SI and NOS views throughout the project as they investigated ideas and theories, critically examined their current curricular practice, and implemented and reflected on these modified curricular practices. By the end of the research study, all participants had uniquely augmented their understanding of SI and NOS. The participants were better able to provide explanatory depth to some SI and NOS ideas; however, specific belief revision with respect to SI and NOS ideas was nominal. Furthermore, their idealized action research plans were not implemented to the extent that they were planned. Explanations for these findings include: impact of significant past educational experiences, prior understanding of SI and NOS, depth of content and pedagogical content knowledge of the discipline, and institutional and instructional constraints. Nonetheless, through participation in the collaborative action research process, the teachers developed professionally, personally, and socially. They identified many positive outcomes from participating in a collaborative action research project; however, they espoused constraints to

  12. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  13. YouthAccess to Alcohol: early findings from a community action project to reduce the supply of alcohol to teens.

    PubMed

    Clark, Sam

    2007-01-01

    The Youth Access to Alcohol (YATA) project was implemented in 2002 by the Alcohol Advisory Council of New Zealand (ALAC) in thirty communities in New Zealand, with the aim of reducing the harm experienced by young people as a result of alcohol misuse in New Zealand through reducing the supply of alcohol by adults to young people. The communities include a mix of rural and urban from both Islands in New Zealand. The project uses a community action approach, which has included setting up collaborative partnerships of key agencies, the delivery of key strategies, and multimedia awareness raising campaigns. The communities are encouraged to identify unique issues in their community regarding alcohol abuse and young people and to develop action plans incorporating a range of strategies that include tested strategies as well as innovative ideas. Communities are trained to implement several tools to monitor changes in their community over time. The study's limitations are noted and future needed research is suggested. PMID:18075928

  14. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  15. Studying Pond Life with Primary-Age Children: The Project Approach in Action.

    ERIC Educational Resources Information Center

    Warner, Laverne; Morse, Pam

    2001-01-01

    Describes the development, implementation, and results of a pond life elementary student research project. Utilizing the pond life example, provides guidelines for children's research projects including the implementation of the K-W-L (know-want to know- learned) strategy with the children's reports/projects. Provides resources utilized in the…

  16. Differential invariants and operators of invariant differentiation of the projectable action of Lie groups

    NASA Astrophysics Data System (ADS)

    Goncharovskii, M. M.; Shirokov, I. V.

    2015-05-01

    We describe the relation between operators of invariant differentiation and invariant operators on orbits of Lie group actions. We propose a new effective method for finding differential invariants and operators of invariant differentiation and present examples.

  17. Interagency Dosimetry Project: Methods for Dosimetry Adjustment Based on Mode of Action

    EPA Science Inventory

    As the science of toxicology evolves, many laboratories are adding new testing protocols or assays in their programs directed at ascertaining mechanistic information on uptake and toxic action of chemicals. In response to the increasing complexity and comprehensiveness of these ...

  18. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained.

  19. Perspectives from Ethiopia regarding U.S. military humanitarian assistance: how to build a better medical civil action project (MEDCAP).

    PubMed

    Miles, Shana; Malone, Joseph L

    2013-12-01

    Assuming that budgetary constraints continue over the next several years, the U.S. military's overseas medical activities including medical civic action projects (MEDCAPs) and humanitarian assistance projects could comprise an increasing proportion of the contributions of U.S. government (USG) to improving global health. We have identified several issues with MEDCAPs in Ethiopia since 2009 that resulted in delays or project cancellations. These were mostly related to lack of a plan to develop sustainable capacities. Although there are many obvious medical needs for civilian populations in Ethiopia, the provision of sustainable development assistance involving these Ethiopian populations on behalf of the USG is a complex undertaking involving coordination with many partners and coordination with several other USG agencies. Military medical professionals planning MEDCAPs and other cooperative global health projects would benefit from consultation and close coordination with U.S. Centers for Disease Control and Prevention (CDC) and U.S. Agency of International Development (USAID) experts who are involved in supporting medium- and long-term health projects in Ethiopia. The establishment of durable military medical academic relationships and involvement of overseas military medical research units could also help promote sustainable projects and build robust professional relationships in global health. PMID:24306018

  20. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  1. From Disenchantment to Dialogue and Action: The "Transforming Community" Project at Emory University

    ERIC Educational Resources Information Center

    Harris, Leslie M.; Usher, Jody

    2008-01-01

    In this article, the authors describe the "Transforming Community Project" (TCP) at Emory University. Emory University is large and dispersed: It comprises approximately 2,700 faculty, 6,400 staff members, and 12,300 students across nine academic divisions. The Transforming Community Project is oriented to both process and product. The process of…

  2. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    SciTech Connect

    1995-09-30

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE`s UMTRA Project is the world`s largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation.

  3. Statistics in Action: The Story of a Successful Service-Learning Project

    ERIC Educational Resources Information Center

    DeHart, Mary; Ham, Jim

    2011-01-01

    The purpose of this article is to share the stories of an Introductory Statistics service-learning project in which students from both New Jersey and Michigan design and conduct phone surveys that lead to publication in local newspapers; to discuss the pedagogical benefits and challenges of the project; and to provide information for those who…

  4. Engaging Young Adolescents in Social Action through Photovoice: The Youth Empowerment Strategies (YES!) Project

    ERIC Educational Resources Information Center

    Wilson, Nance; Dasho, Stefan; Martin, Anna C.; Wallerstein, Nina; Wang, Caroline C.; Minkler, Meredith

    2007-01-01

    The Youth Empowerment Strategies (YES!) project is an afterschool empowerment program and research project for underserved early adolescents. Central to YES! is an empowerment intervention that provides early adolescents with opportunities for civic engagement with other youth around issues of shared concern in their schools and neighborhoods.…

  5. Seeking to Improve African American Girls' Attitudes toward Science: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Buck, Gayle A.; Cook, Kristin L.; Quigley, Cassie F.; Prince, Pearl; Lucas, Yvonne

    2014-01-01

    In this participatory action research study, we answered the question, How can we improve attitudes toward science education of the African American girls at an elementary school? Girls in grades 3-6 completed the Modified Attitudes toward Science Inventory. A purposeful sample of 30 girls participated in several focus-group interviews throughout…

  6. Effects of a Long-Term Participatory Action Research Project on Science Teachers' Professional Development

    ERIC Educational Resources Information Center

    Eilks, Ingo; Markic, Silvija

    2011-01-01

    This paper describes the potential of long-term co-operation between science educators and science teachers concerning the teachers' continuous professional development, based on Participatory Action Research in science education. The discussion is based on a six-year case study observing a group of about ten German chemistry teachers by chemistry…

  7. The Northern New England Social Action Theater. Literacy Theater Staff Training Project: An Evaluation. Evaluation Report.

    ERIC Educational Resources Information Center

    Mackin, Kathleen J.; And Others

    A study examined the effectiveness and replicability of staff training programs provided by the Northern New England Social Action Theater (NNESAT), whose touring component travels around the country promoting the use of improvisational theater as a means of training all levels of literacy practitioners. Questionnaires were administered at 13…

  8. The Power of Words: A Crucial Conversation at the Launch of an Action Research Project

    ERIC Educational Resources Information Center

    Moen, Torill; Solvberg, Astrid M.

    2012-01-01

    Action research in schools implies that the researchers and the teachers should collaborate on solving problems and improving practice. One underlying premise when choosing, such an approach, is that the participants are interested in, and willing to participate in such a process. In this article, the authors explore how words and utterances…

  9. Invariants of projective actions and their application to recognition of fingerprints

    NASA Astrophysics Data System (ADS)

    Konovenko, Nadiia; Lychagin, Valentin

    2016-03-01

    We study the field of rational differential invariants of the left {PSL}2( {R}) -action on the homogeneous space { Diff(S}1)/{PSL}2( {R}) and use them to give an alternative discription of the shape space and fingerprints, introduced by Mumford and Sharon (Int J Comput Vis 70(1):55-75, 2006).

  10. Evaluation of a Multi-Case Participatory Action Research Project: The Case of SOLINSA

    ERIC Educational Resources Information Center

    Home, Robert; Rump, Niels

    2015-01-01

    Purpose: Scholars agree that evaluation of participatory action research is inherently valuable; however there have been few attempts at evaluating across methods and across interventions because the perceived success of a method is affected by context, researcher skills and the aims of the participants. This paper describes the systematic…

  11. Complementary Contributions of Striatal Projection Pathways to Action Initiation and Execution.

    PubMed

    Tecuapetla, Fatuel; Jin, Xin; Lima, Susana Q; Costa, Rui M

    2016-07-28

    The performance of an action relies on the initiation and execution of appropriate movement sequences. Two basal ganglia pathways have been classically hypothesized to regulate this process via opposing roles in movement facilitation and suppression. By using a series of state-dependent optogenetic manipulations, we dissected the contributions of each pathway and found that both the direct striatonigral pathway and the indirect striatopallidal pathway are necessary for smooth initiation and the execution of learned action sequences. Optogenetic inhibition or stimulation of each pathway before sequence initiation increased the latency for initiation: manipulations of the striatonigral pathway activity slowed action initiation, and those of the striatopallidal pathway aborted action initiation. The inhibition of each pathway after initiation also impaired ongoing execution. Furthermore, the subtle activation of striatonigral neurons sustained the performance of learned sequences, while striatopallidal manipulations aborted ongoing performance. These results suggest a supportive versus permissive model, where patterns of coordinated activity, rather than the relative amount of activity in these pathways, regulate movement initiation and execution. PMID:27453468

  12. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect

    Bachrach, A.; Hoopes, J.; Morycz, D. ); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. , Inc., Washington, DC ); Rice, G. )

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  13. Lessons from the Field: Participatory Action Research in a Family Research Project.

    ERIC Educational Resources Information Center

    Robison, Dorothy; Krauss, Marty Wyngaarden

    2003-01-01

    This paper describes development of a study that includes participatory action research, specifically the establishment of a family advisory committee. The study involved a survey of Massachusetts families of children with disabilities. Suggestions for establishing and integrating the committee into the research enterprise are offered, as are…

  14. Uranium Mill Tailings Remedial Action Project (UMTRAP), Rifle, Colorado: Phase 2, Construction drawings [Engineering Materials

    SciTech Connect

    Not Available

    1991-05-13

    This document consists of engineering drawings related to the remedial action of the Old Rifle Processing site, the New Rifle Processing site, and the Estes Gulch disposal site. This report is intended to accompany report DOE/UMTRA--050506 volume 3, appendix F.

  15. The development of peer reflective supervision amongst nurse educator colleagues: An action research project.

    PubMed

    Bulman, C; Forde-Johnson, C; Griffiths, A; Hallworth, S; Kerry, A; Khan, S; Mills, K; Sharp, P

    2016-10-01

    This action research study developed the use of peer reflective supervision (PRS) amongst eight nurse educators contributing to an undergraduate Adult Nursing programme at a UK University. During the academic year (2013-14), nurse educator co-researchers met for an introductory workshop and then met regularly in pairs to facilitate each other's reflection. This provided an opportunity for nurse educators to reflect on identified issues linked to their role with a facilitative peer. Educators met three additional times in a Reflexive Learning Group (RLG), to gather data on their use of PRS. Audio-recordings from the RLGs were transcribed and analysed using Norton's (2009) thematic analysis framework. Co-researchers iteratively validated the data and an external validation group critically viewed the evidence. Overall, seven themes were generated from the three research cycles. These were: PRS as a Valuable Affirming Experience; Time Issues; Facilitation- Support, Trust and Challenge; Developing a Flexible 'Toolbox'; To Write or Not to Write; Drawing on Literature; and Requirement for Action. Findings add new evidence regarding use of a flexible toolbox of resources to develop reflection and offer practical guidance on the development of PRS. Nurse educators often experienced similar concerns, and a facilitative supervision structure allowed co-researchers to positively explore these. Recognition of work pressures and requirement for time and space for reflection was highlighted, particularly regarding writing, and exploring the literature, to develop critical analysis of experiences. The importance of action as part of the reflective process was emphasised. Co-researchers reported positive personal change as well as the opportunity to highlight issues through their reflection for further action within the organisation. The study adds constructive evidence for the use of reflection to explore professional work, make sense of experiences and develop positive action

  16. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  17. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    SciTech Connect

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  18. Theory and action for health promotion illustrations from the North Karelia Project.

    PubMed Central

    McAlister, A; Puska, P; Salonen, J T; Tuomilehto, J; Koskela, K

    1982-01-01

    The North Karelia Project in Finland illustrates the fundamental goals of health promotion. Specific activities of the project serve as examples of how concepts from the social and behavioral sciences can be applied to achieve estimated reductions in predicted risk of disease. The results in North Karelia are not conclusive, but they are encouraging, and the investigations conducted there is an essential reference for future research in health promotion and disease prevention. PMID:7053618

  19. The ultrasonic ranging and data system for radiological surveys in the UMTRA (Uranium Mill Tailings Remedial Action) Project

    SciTech Connect

    Little, C.A.; Berven, B.A.; Blair, M.S.; Dickerson, K.S.; Pickering, D.A.

    1988-01-01

    The Ultrasonic Ranging and Data System (USRADS) was developed to allow radiation exposure data and positional information to be collected, stored and analyzed in a more efficient manner than currently employed on the (Uranium Mill Tailings Remedial Action (UMTRA) project. USRADS is a portable unit which employs ultrasonics, radio frequency transmissions, and a personal computer. Operational experience indicates that the system results in increased information about the property with decreased data analysis and transcription effort and only slightly more field effort. 5 refs., 3 figs., 2 tabs.

  20. Application of NEPA to nuclear weapons production, storage, and testing Weinberger v. Catholic Action of Hawaii/Peace Education Project

    SciTech Connect

    Sauber, A.J.

    1984-01-01

    The National Environmental Policy Act (NEPA) requirement of environmental impact statements for the testing of military equipment, specifically nuclear weapons, conflicts with national security objectives. The author examines NEPA and the Freedom of Information Act (FOIA) in terms of the environmental effects of weapons testing and the relevant case law. The Supreme Court's decision in Catholic Action of Hawaii/Peace Education Project sought to resolve the conflict by distinguishing between a project which is contemplated and one which is proposed. The classification scheme embodied in the FOIA exemption for national security may cause unwarranted frustration of NEPA's goals. The author outlines a new classification system and review mechanism that could curb military abuse in this area.

  1. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them. PMID:24722740

  2. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    SciTech Connect

    Not Available

    1993-12-31

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  3. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    SciTech Connect

    Findlay, Rick

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  4. Project Citizen: Promoting Action-Oriented Citizen Science in the Classroom

    ERIC Educational Resources Information Center

    Green, Carie; Medina-Jerez, William

    2012-01-01

    In recent years, citizen science projects have emerged as a means to involve students in scientific inquiry, particularly in the fields of ecology and environmental science. A citizen scientist is "a volunteer who collects and/or processes data as part of a scientific inquiry" (Silverton 2009, p. 467). Participation in citizen science fosters an…

  5. Participatory Action Research in Education: The National Latino/a Education Research Agenda Project.

    ERIC Educational Resources Information Center

    Pedraza, Pedro

    2002-01-01

    The National Latino/a Education Research Agenda Project, an initiative developed at the Centro de Estudios Puertorriquenos at Hunter College, aims to give voice, perspective, and a research knowledge base to such issues as school reform and to improve academic outcomes and the long term life chances of Latino students and their families and…

  6. Particles in Action. Study Guide. Unit C2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    ERIC Educational Resources Information Center

    Stocklmayer, Sue

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This ZIM-SCI study guide is a four-part unit…

  7. The Facebook-in-Action: Challenging, Harnessing and Enhancing Students Class Assignments and Projects

    ERIC Educational Resources Information Center

    Saifudin, Adam Mohd; Yacob, Aizan; Saad, Rohaizah

    2016-01-01

    Issues of universities students harnessing and capitalizing the usage of Facebook for their own learning capabilities and effective thinking is always the focus of education scholars, in assessing the quality class assignments and projects produced by them. Therefore, Facebook is now becoming unbearable influence since the internet activation in…

  8. A Collaborative Action Research Project in an Inclusive Setting: Assisting a Blind Student

    ERIC Educational Resources Information Center

    Argyropoulos, Vassilios; Stamouli, Marina

    2006-01-01

    There has been a lot of discussion about the context and the content of integration and inclusion in Greece for the students with visual impairments. These discussions have led to the formulation of models of inclusion such as the co-teaching scheme. This article presents a project focused on an educational setting within which a sixth-grader…

  9. Community Colleges and Regional Recovery: Strategies for State Action. Project on State and Metropolitan Innovation

    ERIC Educational Resources Information Center

    Kazis, Richard

    2011-01-01

    Employers need a pipeline of quality workers with different levels of skill and desired earnings. Almost half of U.S. jobs today can be defined as "middle skill" jobs, requiring less than a four-year degree but more than a high school diploma. The Bureau of Labor Statistics (BLS) occupational projections indicate that job categories for which the…

  10. Leading multi-professional teams in the children’s workforce: an action research project

    PubMed Central

    Stuart, Kaz

    2012-01-01

    Introduction The 2004 Children Act in the UK saw the introduction of integrated working in children’s services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. Methods A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? Results When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. Conclusion The paper concludes that trust and relational agency are central to effective leadership of multi professional teams. PMID:22371690

  11. Teaching clinical reasoning by making thinking visible: an action research project with allied health clinical educators

    PubMed Central

    2014-01-01

    Background Clinical reasoning is fundamental to all forms of professional health practice, however it is also difficult to teach and learn because it is complex, tacit, and effectively invisible for students. In this paper we present an approach for teaching clinical reasoning based on making expert thinking visible and accessible to students. Methods Twenty-one experienced allied health clinical educators from three tertiary Australian hospitals attended up to seven action research discussion sessions, where they developed a tentative heuristic of their own clinical reasoning, trialled it with students, evaluated if it helped their students to reason clinically, and then refined it so the heuristic was targeted to developing each student’s reasoning skills. Data included participants’ written descriptions of the thinking routines they developed and trialed with their students and the transcribed action research discussion sessions. Content analysis was used to summarise this data and categorise themes about teaching and learning clinical reasoning. Results Two overriding themes emerged from participants’ reports about using the ‘making thinking visible approach’. The first was a specific focus by participating educators on students’ understanding of the reasoning process and the second was heightened awareness of personal teaching styles and approaches to teaching clinical reasoning. Conclusions We suggest that the making thinking visible approach has potential to assist educators to become more reflective about their clinical reasoning teaching and acts as a scaffold to assist them to articulate their own expert reasoning and for students to access and use. PMID:24479414

  12. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  13. Service user integration into social work education: lessons learned from nordic participatory action projects.

    PubMed

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education. PMID:25662088

  14. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    ERIC Educational Resources Information Center

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  15. Seeking to Bridge the Divide: Linking Formal and Non-Formal Education in Uttar-Pradesh, India. IBE Collaborative Projects: Strengthening Capacities through Action

    ERIC Educational Resources Information Center

    Zutshi, Bupinder

    2004-01-01

    The new monograph series, IBE Collaborative Projects: Strengthening Capacities through Action, documents projects initiated and managed by local or national level institutions in diverse countries, which have been technically or academically assisted by UNESCO's International Bureau of Education (IBE). This first publication in the series…

  16. The content, format and timing of a preparation for childhood hospitalization booklet: An action research project.

    PubMed

    Gordon, Bronwyn K; Crisp, Jackie

    2016-06-01

    The experience of childhood hospitalization may be improved by appropriate preparation. As part of a larger project to improve preparation practices for children and their families, a group of health-care professionals investigated the content, format and timing of a pre-existing preparation booklet for a particular procedure. This article analyses the evaluation of the preparation booklet that led to a finding that collaboration among health-care professionals enables improved practice and shared professional power and responsibility. PMID:25613140

  17. Quarry Haul Road Ecological Survey. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri: Revision 1

    SciTech Connect

    Not Available

    1992-09-01

    This biological survey was performed to document the summer flora and fauna found along the haul road constructed as part of the remedial action for the quarry bulk waste. State and Federal species listed as threatened or endangered were noted if encountered while surveying. Sampling locations were equally spaced along the quarry haul road, and a survey for vegetation and birds conducted at each location. Bird observations were conducted as breeding bird surveys once in June of 1991, and again in June of 1992. Each year`s survey includes two observations in the early morning and one late in the evening. Vegetation surveys were conducted in 1991 using quadrants and transects. mammal, reptile, and amphibian sightings were noted as encountered.

  18. The GODAE High Resolution SST Project: Standards Based Interoperability in Action

    NASA Astrophysics Data System (ADS)

    Casey, K. S.

    2007-12-01

    The Global Ocean Data Assimilation Experiment (GODAE) High Resolution Sea Surface Temperature (GHRSST) project is a large scale international effort to coordinate the production, distribution, and archiving of a wide range of satellite-based SST datasets. Built on existing standards for data formats and both file-level and collection- level metadata, the GHRSST project has achieved a high level of success in an area that has seen little past national cooperation and even less international cooperation. Today, GHRSST data are produced in common formats following internationally accepted content standards by government agencies, academic institutions, and commercial companies around the world. By following the format and content standards for metadata and data, GHRSST has successfully built and deployed a Regional/Global Task Sharing framework in which data and metadata are produced at local centers but centrally managed at a Global Data Assembly Center and archived at a Long Term Stewardship and Reanalysis Facility. Interoperable data access is enabled at all levels of this international framework. This presentation will examine the lessons learned over the last several years as GHRSST has adopted numerous standards, including netCDF with Climate and Forecast (CF) attribute conventions for data, and both Global Change Master Directory Document Interchange Format and Federal Geographic Data Commission standards for metadata. Plans for future adoption of emerging standards like netCDF-4 and ISO19115 will also be discussed.

  19. The project HICARE: cross-sectoral action alliance against multi-resistant pathogens

    PubMed Central

    Linder, Roland; Thoms, Isabell; Pfenning, Ingo; Schadowski, Rolando; Möws, Volker

    2011-01-01

    Multi-resistant pathogens are a serious problem on a considerable scale for the health sector. Patients with infections induced by multi-resistant bacteria cause enormous additional treatment costs of around 20,500 € per insured. Due to the recently used billing and documentation system there is a significant shortage of information transparency. The guidelines for hospital hygiene and infection prevention published by the Robert Koch Institute (RKI) include a presumption provision, which means that subject to compliance with these guidelines the observance of the current state of medical science is suspected. In case of a derogation, a scientific justification is necessary, which is used e.g. in connection with liability questions. Within the framework of legal reforms in 2011, the legislator aspires a nationwide improvement of hygiene quality in medical institutions and information transparency. Many specific issues about the general reporting obligation of infections with multi-resistant pathogens or about the standardized exchange of infection documentations between medical institution and health authority remain unresolved. Regional, cross-sectoral networks create the base to tackle targeted measures collectively and may develop sustainable and tailored solutions for their region. With these considerations in mind, the project HICARE was founded in Mecklenburg-Vorpommern. The project pursues the aim to develop an intervention strategy against the spread of multi-resistant pathogens. Health insurances make an important contribution to quality of medical treatment by participation. PMID:22242106

  20. Tele-autonomous systems: New methods for projecting and coordinating intelligent action at a distance

    NASA Technical Reports Server (NTRS)

    Conway, Lynn; Volz, Richard; Walker, Michael W.

    1989-01-01

    There is a growing need for humans to perform complex remote operations and to extend the intelligence and experience of experts to distant applications. It is asserted that a blending of human intelligence, modern information technology, remote control, and intelligent autonomous systems is required, and have coined the term tele-autonomous technology, or tele-automation, for methods producing intelligent action at a distance. Tele-automation goes beyond autonomous control by blending in human intelligence. It goes beyond tele-operation by incorporating as much autonomy as possible and/or reasonable. A new approach is discussed for solving one of the fundamental problems facing tele-autonomous systems: The need to overcome time delays due to telemetry and signal propagation. New concepts are introduced called time and position clutches, that allow the time and position frames between the local user control and the remote device being controlled, to be desynchronized respectively. The design and implementation of these mechanisms are described in detail. It is demonstrated that these mechanisms lead to substantial telemanipulation performance improvements, including the result of improvements even in the absence of time delays. The new controls also yield a simple protocol for control handoffs of manipulation tasks between local operators and remote systems.

  1. Does Education Plus Action Lead to Leadership on Climate? Preliminary Results from the ACE Leadership Development Longitudinal Survey Project

    NASA Astrophysics Data System (ADS)

    Anderson, R. K.; Qusba, L.; Lappe, M.; Flora, J. A.

    2014-12-01

    Through education and leadership development, Alliance for Climate Education (ACE) is building a generation of confident and capable youth driving climate solutions now throughout their lives. In 2011-12, a random sample of 2,800 high school students across the country was surveyed before and after seeing the ACE Assembly on climate science and solutions. The survey showed that the ACE Assembly resulted in a 27% increase in climate science knowledge scores, with 59% of students increasing their intentions to take action on climate and a doubling of the number of students talking to parents and peers about climate change. Students were also compared to the Global Warming's Six Americas classification of Americans' views on climate. Following the ACE Assembly, 60% of students were alarmed or concerned about climate change. Building off these results, in 2014 ACE began to assess the results of its leadership development program that follows the ACE Assembly. The goal of this survey project is to measure ACE's long-term impact on students' college and career pathways, civic engagement and climate action. Preliminary results show that a majority of students in ACE's leadership development program are alarmed about global warming and are having conversations about global warming. A majority of these students also feel confident in their ability to lead a climate-related campaign in their school and community. These students will continue to be surveyed through 2015.

  2. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    SciTech Connect

    Not Available

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells.

  3. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process.

  4. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  5. Assessment in Action: Collaborative Action Research Focused on Mathematics and Science Assessments. Reports of Twenty-Three Teacher-Research Projects.

    ERIC Educational Resources Information Center

    Dearn, Ceri; And Others

    The works reported in this book represent a second phase to a 2-day summer conference that focused on assessment in mathematics and science classrooms. This book presents research and findings of a subset of the conference participants who investigated a self-selected aspect of assessment in their educational environments. Action research was the…

  6. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    ERIC Educational Resources Information Center

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  7. An Action Resarch Proposal: Identifying and Addressing Problems Related to RACC's Writing Laboratory. Title III Curriculum Enrichment Activity: Faculty Development Project. Final Report.

    ERIC Educational Resources Information Center

    Horner, Annette; Jacobson, Karen H.

    An action research project was undertaken to understand how the Writing Laboratory at Reading Area Community College (RACC) defines and accomplishes its work, what faculty and students expect of the lab, and how they make use of it. The investigation sought to foster discussion and reflection on the appropriate role and staffing of a college…

  8. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  9. Improving Governance, Leadership, and Learning in New Jersey. State Action for Education Leadership Project (SAELP) Forum, January 28-29, 2003. Field Notes

    ERIC Educational Resources Information Center

    Bleistein, Stacey, Ed.

    2004-01-01

    New Jersey is one of fifteen states selected by the Wallace-Reader's Digest Fund to receive a planning and implementation grant for setting a reform agenda for a series of state policies that are designed to improve educational leadership and student learning. Under this grant, the State Action for Education Leadership Project (SAELP)…

  10. Using Nikola Tesla's Story and His Experiments as Presented in the Film "The Prestige" to Promote Scientific Inquiry: A Report of an Action Research Project

    ERIC Educational Resources Information Center

    Hadzigeorgiou, Yannis; Garganourakis, Vassilios

    2010-01-01

    This paper reports on an action research project undertaken with the primary aim of investigating the extent to which situations that evoke a sense of wonder can promote scientific inquiry. Given the intense interest, curiosity, and wonder that some students had begun to develop after seeing the film "The Prestige", a science teacher used this…

  11. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  12. Understanding the challenges of palliative care in everyday clinical practice: an example from a COPD action research project.

    PubMed

    Hynes, Geralyn; Kavanagh, Fiona; Hogan, Christine; Ryan, Kitty; Rogers, Linda; Brosnan, Jenny; Coghlan, David

    2015-09-01

    Palliative care seeks to improve the quality of life for patients suffering from the impact of life-limiting illnesses. Palliative care encompasses but is more than end-of-life care, which is defined as care during the final hours/days/weeks of life. Although palliative care policies increasingly require all healthcare professionals to have at least basic or non-specialist skills in palliative care, international evidence suggests there are difficulties in realising such policies. This study reports on an action research project aimed at developing respiratory nursing practice to address the palliative care needs of patients with advanced chronic obstructive pulmonary disease (COPD). The findings suggest that interlevel dynamics at individual, team, interdepartmental and organisational levels are an important factor in the capacity of respiratory nurses to embed non-specialist palliative care in their practice. At best, current efforts to embed palliative care in everyday practice may improve end-of-life care in the final hours/days/weeks of life. However, embedding palliative care in everyday practice requires a more fundamental shift in the organisation of care. PMID:25514830

  13. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    SciTech Connect

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-12-31

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely.

  14. 76 FR 20807 - Notice of Final Federal Agency Actions on the Sellwood Bridge Project, SE Tacoma Street and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ...), Department of Transportation. ACTION: Notice of limitation on claims for judicial review of actions by FHWA... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions that are... Federal law that authorizes judicial review of a claim provides a time period of less than 180 days...

  15. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  16. Ethical considerations related to participation and partnership: an investigation of stakeholders’ perceptions of an action-research project on user fee removal for the poorest in Burkina Faso

    PubMed Central

    2014-01-01

    Background Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. Methods We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. Results The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. Conclusions This investigation of the Ouargaye project serves to illuminate the distinctive

  17. Weldon Spring quarry construction staging area and water treatment plant site remedial action characterization report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1991-09-01

    The quarry construction staging area (QCSA) and water treatment plant (WTP) are located in the areas that border the western edge of the Weldon Spring quarry (WSQ). These facilities were constructed to support bulk waste removal from the WSQ. This area was contaminated with U-238, Ra-226, and Th-230 and was remediated prior to construction in order to allow release of the area for use without radiological restrictions. This report documents the methods of characterization, the remediation activities, and the post remedial action sampling methods and analytical results. 4 refs., 6 figs., 4 tabs.

  18. A Collaborative Action Research Project in the Kindergarten: Perspectives and Challenges for Teacher Development through Internal Evaluation Processes

    ERIC Educational Resources Information Center

    Galini, Rekalidou; Efthymia, Penderi

    2010-01-01

    Background: Collaborative action research provides teachers with the framework and methodology to reflect upon their work and take action with regard to specific concerns and situations in their classrooms. Within this approach, internal evaluation could be a useful tool to help teachers develop critical thinking about their work by locating areas…

  19. Proceedings of the geosciences workshop

    SciTech Connect

    1991-01-01

    The manuscripts in these proceedings represent current understanding of geologic issues associated with the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is in St. Charles County, Missouri. The proceedings are the record of the information presented during the WSSRAP Geosciences Workshop conducted on February 21, 1991. The objective of the workshop and proceedings is to provide the public and scientific community with technical information that will facilitate a common understanding of the geology of the Weldon Spring site, of the studies that have been and will be conducted, and of the issues associated with current and planned activities at the site. This coverage of geologic topics is part of the US Department of Energy overall program to keep the public fully informed of the status of the project and to address public concerns as we clean up the site and work toward the eventual release of the property for use by this and future generations. Papers in these proceedings detail the geology and hydrology of the site. The mission of the WSSRAP derives from the US Department of Energy's Surplus Facilities Management Program. The WSSRAP will eliminate potential hazards to the public and the environment and make surplus real property available for other uses to the extent possible. This will be accomplished by conducting remedial actions which will place the quarry, the raffinate pits, the chemical plant, and the vicinity properties in a radiologically and chemically safe condition. The individual papers have been catalogued separately.

  20. 78 FR 64592 - Notice of Final Federal Agency Actions on the Stehekin Valley Road Improvement Project From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Improvement Project From the Stehekin River Corridor Implementation Plan: Chelan County, Washington AGENCY... Improvement project from the Stehekin River Corridor Implementation Plan in Chelan County, Washington. This... Decision, NPS Stehekin River Corridor Implementation Plan Environmental Impact Statement (EIS) and...

  1. Kaleidoscope: a 5-year action research project to develop nursing confidence in caring for patients with HIV disease in west India.

    PubMed

    Pratt, R J; Pellowe, C M; Juvekar, S K; Potdar, N S; Weston, A J; Joykutty, A; Robinson, N; Loveday, H P

    2001-09-01

    As the national epidemic of human immunodeficiency virus (HIV) infection and the acquired immune deficiency syndrome (AIDS) epidemic rapidly unfolds in India, nurses have to acquire new competencies in order to provide appropriate care to an increasing number of affected persons. In response, an Indo-British action research collaboration was initiated to build clinical confidence and facilitate relevant changes in nursing practice. During a 10-day educational programme, a change intervention was applied, culminating in the development of individual and partnership action plans focused on bringing about changes in nursing practice within well-defined fields of action. Following implementation of their action plans, participants were reassembled 12 months later for a follow-up workshop to discuss their progress and describe those factors that either helped or hindered them in achieving their objectives. They then developed new action plans for the next 12-month period. This article reports on the results from six cohorts (n = 160) in India who participated in this project between 1995 and 1999. Action plans were frequently focused on infection control, primary prevention, curriculum development in preregistration nursing programmes and in-service nursing education. The majority of participants reported significant achievements in realizing their action-plan objectives. Data analysis revealed that the change intervention itself, together with multidisciplinary support from colleagues, the senior status of the participant, and anticipating and attending the follow-up workshop, were all positively correlated with achievement. The lack of personal authority and resistance from managers were the two major factors negatively correlated with achievement. This method for facilitating changes in nursing practice has been successfully adapted and replicated by our group in other countries. PMID:11558691

  2. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    SciTech Connect

    Not Available

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  3. Strategies of Action for Strengthening the Associated Schools Project in the Asia-Pacific Region. Final Report of a Regional Meeting to Formulate Strategies of Action for National Co-ordinators of Unesco Associated Schools Project (Bangkok, Thailand, December 16-22, 1986).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific and Cultural Organization, Bangkok (Thailand). Principal Regional Office for Asia and the Pacific.

    Results of a regional meeting to assess the current situation of the Associated Schools Project and to develop strategies of action at the national level are presented in this report. Twelve observers from China and Thailand and 16 representatives from 10 countries participated in the meeting. Participating countries included Australia,…

  4. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project

    SciTech Connect

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

  5. Action Research Monographs. Complete Set. Pennsylvania Action Research Network, 1998-99. A Section 353 Project of the Pennsylvania Department of Education, Bureau of Adult Basic and Literacy Education. A Learning from Practice Project.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., McKeesport.

    This publication consists of the complete set of 23 monographs developed by the Pennsylvania Action Research Network to supplement the 67 monographs produced over the past 3 years. The specific audience are literacy, General Educational Development (GED), and English-as-a Second Language (ESL) practitioners. The titles are: "Use of Metacognitive…

  6. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado: Remedial action selection report. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-10-01

    The Gunnison uranium mill tailings site is just south of the city limits of Gunnison, Colorado, in the south-central part of the state. The entire site covers 61 acres in the valley of the Gunnison River and Tomichi Creek. Contaminated materials at the Gunnison processing site include the tailings pile, covering about 35 acres to an average depth of nine feet and containing 459,000 cubic yards. Ore storage areas and the former mill processing area cover about 20 acres on the south side of the site. The volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 718,900 cubic yards. An interim action was approved by the US Department of Energy to eliminate existing safety hazards to the Gunnison community. These actions, started in September 1991, included demolition of mill buildings and related processing facilities, excavation of two underground storage tanks, removal of asbestos and other hazardous materials from buildings, storage of those materials in a secured area on the site, and improvements of site security.

  7. Soils Project Risk-Based Corrective Action Evaluation Process with ROTC 1 and ROTC 2, Revision 0

    SciTech Connect

    Matthews, Patrick; Sloop, Christina

    2012-04-01

    This document formally defines and clarifies the NDEP-approved process the NNSA/NSO Soils Activity uses to fulfill the requirements of the FFACO and state regulations. This process is used to establish FALs in accordance with the risk-based corrective action (RBCA) process stipulated in Chapter 445 of the Nevada Administrative Code (NAC) as described in the ASTM International (ASTM) Method E1739-95 (NAC, 2008; ASTM, 1995). It is designed to provide a set of consistent standards for chemical and radiological corrective actions.

  8. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  9. Mathematical Speech and Practical Action: A Case Study of the Challenges of Including Mathematics in a School Technology Project

    ERIC Educational Resources Information Center

    Bungum, Berit; Manshadi, Saeed; Lysne, Dag Atle

    2014-01-01

    This paper presents a case study of how a teacher and nine-year-old students deal with mathematics in a practical technology project. By analysing videotaped dialogues between teacher and a pair of students working on constructing a house model, we identify challenges of meaningful inclusion of mathematics in the project. The dialogues are…

  10. Give Water a Hand. Community Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation within a community, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  11. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  12. Give Water a Hand. Home Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water and water conservation within the home while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  13. City Initiatives in School-Age Child Care. SACC Action Research Paper No. 1. School-Age Child Project.

    ERIC Educational Resources Information Center

    Gannett, Ellen

    Features contributing to the success of six city-wide, comprehensive school-age program models are highlighted. Models are Seattle, Washington's Community Partnerships for School-Age Child Care; Madison, Wisconsin's School-Age Child Care Project; Irvine, California's Irvine Child Care Project; Houston, Texas' After-School Partnership; Los Angeles,…

  14. Initiating a Collaborative Action Research Project: From Choosing a School to Planning the Work on an Issue

    ERIC Educational Resources Information Center

    Bello, Eva Espido

    2006-01-01

    This article is centred on a preliminary phase of action research which the literature has not given much attention to. The initial stages are usually complex and the ideas on how to proceed are often unclear. Therefore, learning how different authors have dealt with them can serve as guidelines when initiating new research, which is why I have…

  15. When Soda Is a Social Justice Issue: Design and Documentation of a Participatory Action Research Project with Youth

    ERIC Educational Resources Information Center

    Noonan, James

    2015-01-01

    Schools are increasingly seen as having a promising role to play in reducing adverse health and wellness outcomes among young people. This paper uses a collaborative action research approach to examine the effects of one school's efforts to change its students' eating habits by implementing a "junk-food free campus." By engaging school…

  16. Creating and Sustaining a Professional Learning Community to Impact Student Achievement on a High School Campus: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Dionne DeShall

    2013-01-01

    Professional learning communities (PLCs) have become one of the most talked about ideas in education today. Many K-12 schools are working to become PLCs in the hope that student learning will improve when adults commit themselves to talking collaboratively about teaching and learning and then take action that will improve student learning and…

  17. The Effect of an Energy Audit Service Learning Project on Student Perceptions of STEM Related Disciplines, Personal Behaviors/Actions towards the Environment, and Stewardship Skills

    NASA Astrophysics Data System (ADS)

    Gullo, Michael

    The purpose of this study was to investigate whether or not service learning could be considered an alternative teaching method in an environmental science classroom. In particular, the results of this research show whether an energy audit service learning project influenced student environmental awareness (knowledge of environmental issues, problems, and solutions), student personal actions/behaviors towards the environment, student perceptions and attitudes of science related careers, and community partnerships. Haines (2010) defines service learning as “a teaching and learning strategy that integrates meaningful community service with instruction and reflection to enrich the learning experience, teach civic responsibility, and strengthen communities” (p. 16). Moreover, service learning opportunities can encourage students to step out of their comfort zone and learn from hands-on experiences and apply knowledge obtained from lectures and classroom activities to real life situations. To add to the growing body of literature, the results of this study concluded that an energy audit service learning project did not have a measureable effect on student perceptions and attitudes of science related careers as compared to a more traditional teaching approach. However, the data from this study did indicate that an energy audit service learning project increased students personal actions/behaviors towards the environment more than a direct teaching approach.

  18. Idaho Completion Project’s Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  19. Coordinated international action to accelerate genome-to-phenome with FAANG, The Functional Annotation of Animal Genomes project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    We describe the organization of a nascent international effort - the "Functional Annotation of ANimal Genomes" project - whose aim is to produce comprehensive maps of functional elements in the genomes of domesticated animal species....

  20. Malczyce, Poland: a multifaceted community action project in eastern Europe in a time of rapid economic change.

    PubMed

    Moskalewicz, J; Swiatktewicz, G

    2000-01-01

    The major focus of this paper is the sustainability of a one-year demonstration project on drug misuse prevention, which was implemented in a local community affected by acute economic crisis and high unemployment. The project was initiated by the Institute of Psychiatry and Neurology, and supported by the European Commission. The primary goal of the project was to demonstrate that community-based prevention is possible and feasible within the context of current transitions in Poland. Its major outcome was a community prevention package consisting of a number of booklets and videos to assist other communities in their prevention efforts. Experiences from this study suggest that factors contributing to the sustainability of a community prevention project can be identified and emphasized through simple analysis of community surveys, as well as focus group discussion. PMID:10677883

  1. Mathematical speech and practical action: a case study of the challenges of including mathematics in a school technology project

    NASA Astrophysics Data System (ADS)

    Bungum, Berit; Manshadi, Saeed; Atle Lysne, Dag

    2014-11-01

    This paper presents a case study of how a teacher and nine-year-old students deal with mathematics in a practical technology project. By analysing videotaped dialogues between teacher and a pair of students working on constructing a house model, we identify challenges of meaningful inclusion of mathematics in the project. The dialogues are analysed in terms of an analytical framework where four categories of interaction patterns are combined with two main paradigms of mathematics teaching: the exercise paradigm and landscapes of interaction. The project in itself has a potential for facilitating landscapes of investigation in mathematics teaching. However, we find that the teacher as well as students adheres to the exercise paradigm when mathematics is involved in the activity. Two illustrating episodes from the project are examined and presented in detail in this paper. The findings illustrate that the conceptions teachers and students hold of what mathematics teaching means can act as an obstacle in attempts to realize mathematics teaching in creative and meaningful contexts for young students. We suggest that making the various purposes of a project more explicit may help overcome this obstacle, and that the mathematics involved might be taught in separate sessions in order to form a constructive part of a cross-curricular project.

  2. Improving student performance in an introductory biology majors course: A social action project in the scholarship of teaching

    NASA Astrophysics Data System (ADS)

    Chambers, Sara Lang Ketchum

    This social action study followed an introductory biology course for a three-year period to determine whether changes in teaching personnel, instructional techniques and reorientation to student-centered learning would impact student performance. The course was redirected from a traditional lecture-laboratory format to one emphasizing active learning inquiry methods. Student retention, achievement, and failure were observed for three years in addition to one year prior, and one year following, the study. The study examined the two semester introductory biology course required of all biology majors and those intending a career in science, medicine or dentistry. During the first semester of the study, the dropout rate decreased from 46% to 21%. Prior to the study, 39% of the students completing the course received a grade of D or F while only 4% received a grade of B or above. During the first semester of the study 14% of the students received a grade of D or F while 46% received a B, B+ or A grade. Similar results were seen in other semesters of the study. A statistical comparison of student retention and performance was carried out using grade data for classes taught by the original faculty, the action study faculty and the post-study faculty. The differences between the original faculty and the action study faculty were statistically significant. Effect size calculations indicated large differences between the action study faculty and the two other faculty groups in terms of student retention, achievement and failure. The results are attributed to both the personnel change and, more significantly, the change in teaching methods and emphasis on student-active learning. Comparison between the pre- and post-study teams showed less dramatic effect sizes than when the action study data were compared with the data from either other team. Nevertheless, the post-study results showed that although the retention rate dropped during the year after the study, the improvement

  3. Weldon spring site environmental report for calendar year 1996. Revision 0

    SciTech Connect

    1997-07-23

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring.

  4. Interdisciplinary linkage of community psychology and cross-cultural psychology: history, values, and an illustrative research and action project on intimate partner violence.

    PubMed

    Mankowski, Eric S; Galvez, Gino; Glass, Nancy

    2011-03-01

    An analysis of the respective organizational histories, missions, and scholarly activity of the International Association for Cross-Cultural Psychology and the Society for Community Research and Action was conducted in order to inform the development of interdisciplinary linkages between members of the two organizations. The analysis revealed many points of shared values and actions, as well as some important differences. Both scholarly organizations developed out of a similar historical and cultural zeitgeist in the late 1960s and early 1970s. The missions emphasize the role of culture/diversity in psychological phenomena, adopting an interdisciplinary orientation, the value of collaboration, the importance of research method and ethics, and the value of action research. However, community psychology generally lacks an adequate treatment of cultural phenomena while cross-cultural psychology often fails to draw on community and participatory methods useful for understanding culture in context. These common roots and differences are examined. Finally, we describe a community based, participatory research and intervention project to address intimate partner violence among Latinos and European-Americans living in Oregon. Analysis of the research process and on some of our initial findings illustrates challenges and potential benefits of an interdisciplinary, cultural community psychology. PMID:21052822

  5. Performance of Core Exit Thermocouple for PWR Accident Management Action in Vessel Top Break LOCA Simulation Experiment at OECD/NEA ROSA Project

    NASA Astrophysics Data System (ADS)

    Suzuki, Mitsuhiro; Takeda, Takeshi; Nakamura, Hideo

    Presented are experiment results of the Large Scale Test Facility (LSTF) conducted at the Japan Atomic Energy Agency (JAEA) with a focus on core exit thermocouple (CET) performance to detect core overheat during a vessel top break loss-of-coolant accident (LOCA) simulation experiment. The CET temperatures are used to start accident management (AM) action to quickly depressurize steam generator (SG) secondary side in case of core temperature excursion. Test 6-1 is the first test of the OECD/NEA ROSA Project started in 2005, simulating withdraw of a control rod drive mechanism penetration nozzle at the vessel top head. The break size is equivalent to 1.9% cold leg break. The AM action was initiated when CET temperature rose up to 623K. There was no reflux water fallback onto the CETs during the core heat-up period. The core overheat, however, was detected with a time delay of about 230s. In addition, a large temperature discrepancy was observed between the CETs and the hottest core region. This paper clarifies the reasons of time delay and temperature discrepancy between the CETs and heated core during boil-off including three-dimensional steam flows in the core and core exit. The paper discusses applicability of the LSTF CET performance to pressurized water reactor (PWR) conditions and a possibility of alternative indicators for earlier AM action than in Test 6-1 is studied by using symptom-based plant parameters such as a reactor vessel water level detection.

  6. Environmental compliance plan for the Lower East Fork Poplar Creek Remedial Action Project at Oak Ridge, Tennessee

    SciTech Connect

    1996-07-01

    Remedial action for Lower East Fork Poplar Creek, as defined by the Record of Decision, requires that soil contaminated with >400 ppM mercury be excavated and disposed. Based on the remediation goal, soil will be excavated from areas located at the NOAA site and the Bruner site and disposed at the Industrial Landfill V at the Y-12 Plant. Objective is to minimize the risk to human health and the environment from contaminated soil in the lower EFPC floodplain pursuant to CERCLA and the Federal Facility Agreement (DOE 1992).

  7. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Appendixes A--D

    SciTech Connect

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion data. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 X 10{sup {minus}6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground. The main report describes brief background to the project, describes and analyzes the grouting operations, draws conclusions from the work performed, and presents some of the lessons learned. Appendices contain: (A) pipe driving records; (B) casing grout injection records; (C) in-situ hydraulic conductivity testing records; and (D) grout quality control testing records.

  8. Resistance through Re-Presenting Culture: Aboriginal Student Filmmakers and a Participatory Action Research Project on Health and Wellness

    ERIC Educational Resources Information Center

    Riecken, Ted; Conibear, Frank; Michel, Corrine; Lyall, John; Scott, Tish; Tanaka, Michele; Stewart, Suzanne; Riecken, Janet; Strong-Wilson, Teresa

    2006-01-01

    This article focuses on a participatory research project designed to promote student use of digital video to explore conceptions of health and wellness. We have viewed aspects of student resistance through the cultural perspectives that guide the Aboriginal education programs involved with the study. In presenting this piece, we have experimented…

  9. Using Films in Teaching Intercultural Concepts: An Action Research Project at Two Universities in India and the United States

    ERIC Educational Resources Information Center

    Pandey, Satish; Ardichvili, Alexandre

    2015-01-01

    Films are used as a tool for teaching cross-cultural and intercultural concepts in higher education and in corporate settings. However, the processes and outcomes of using films in intercultural training and education have not been systematically researched. This paper discusses the results of a collaborative project involving faculty and students…

  10. Reducing Nutrients and Nutrient Impacts Priority Issue Team - St. Louis Bay Project: Implementing Nutrients PIT Action Step 1.1

    NASA Technical Reports Server (NTRS)

    Mason, Ted

    2011-01-01

    The NASA Applied Science & Technology Project Office at Stennis Space Center(SSC) used satellites, in-situ measurements and computational modeling to study relationships between water quality in St. Louis Bay, Mississippi and the watershed characteristics of the Jourdan and Wolf rivers from 2000-2010.

  11. Real-Time Feedback in the Singing Studio: An Innovatory Action-Research Project Using New Voice Technology

    ERIC Educational Resources Information Center

    Welch, Graham F.; Howard, David M.; Himonides, Evangelos; Brereton, Jude

    2005-01-01

    The article reports on a one-year AHRB-funded Innovations project that was designed to evaluate the usefulness, or otherwise, of the application of real-time visual feedback technology in the singing studio. The basis for the research was a multi-disciplinary approach that drew on voice science and acoustics, the psychology of singing and voice…

  12. Forces in Action. Study Guide. Unit H1. ZIM-SCI, Zimbabwe Secondary School Science Project. Year 2.

    ERIC Educational Resources Information Center

    Dube, Peter

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This ZIM-SCI study guide presents activities…

  13. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  14. Outcomes of the Nutri-Senex project: a co-ordination action funded by the European Commission.

    PubMed

    Elmadfa, I; Freisling, H; Kueck, M; Matullat, I; Hall, G; Azpiroz, A; Kiely, M

    2008-01-01

    This project's primary aim is to contribute to the improvement of the quality of life of the elderly. The state of the art in age-related research and technology, to highlight the most promising areas for development, has been documented in an extensive literature report. A research database has been established to map current research activities within the European research area. Through several expert group meetings with representatives from universities, research institutions, organizations concerned with the care of the elderly, and industry, suitable technologies and policies that can improve the diet of the elderly have been identified. A legislation survey relating to aspects of nutrition of the elderly has been carried out. A set of guidelines and recommendations of best practice for use in the health and care industry have been developed. The project's results are disseminated through an enhanced website, technology transfer workshops and a staff training program. Good communication between the partners has been promoted and permanent research links have been forged. The main outputs will lead to better co-ordinated European research: less duplication of effort, more rapid commercialization, increased awareness of the problems faced by the elderly, improved guidelines and recommendations for health care professionals and policymakers. PMID:18382084

  15. Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge.

  16. Interim response action basin F liquid incineration project final draft human health risk assessment. Volume 1. Final draft report

    SciTech Connect

    1991-07-01

    This document is a comprehensive, multiple exposure pathway, human health risk assessment prepared for the proposed Basin F Liquid Incineration Project. The submerged quench incinerator will treat Basin F liquid and hydrazine rinse water. The objective of the risk assessment is to establish chemical emission limits which are protective of human health. Average and maximum lifetime daily intakes were calculated for adults, children, and infants in four maximum exposure scenarios under base case and sensitivity case emissions condition. It was concluded that the incineration facility poses neither carcinogenic nor noncarcinogenic risk to any sensitive population. The assessment is divided into: (1) Incineration facility description; (2) Description of surrounding area; (3) Process of pollutant identification and selection; and (4) Determination of emission rates from incineration facility.

  17. Field grouting summary report on the WAG seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Text

    SciTech Connect

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10{sup {minus}6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground.

  18. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3. Appendixes E and F

    SciTech Connect

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of j Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70 percent of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10{sup -6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground.

  19. Improving actions to control high blood pressure in Hispanic communities — Racial and Ethnic Approaches to Community Health Across the U.S. Project, 2009–2012☆

    PubMed Central

    Liao, Youlian; Siegel, Paul Z.; White, Shannon; Dulin, Rick; Taylor, April

    2015-01-01

    Background Compared with the general population in the United States (U.S.), Hispanics with hypertension are less likely to be aware of their condition, to take antihypertensive medication, and to adopt healthy lifestyles to control high blood pressure. We examined whether a multi-community intervention successfully increased the prevalence of actions to control hypertension among Hispanics. Methods Annual survey from 2009–2012 was conducted in six Hispanic communities in the Racial and Ethnic Approaches to Community Health (REACH) Across the U.S. project. The survey used address based sampling design that matched the geographies of intervention program. Results Age- and sex-standardized prevalences of taking hypertensive medication, changing eating habits, cutting down on salt, and reducing alcohol use significantly increased among Hispanics with self-reported hyper-tension in REACH communities. The 3-year relative percent increases were 5.8, 6.8, 7.9, and 35.2% for the four indicators, respectively. These favorable (healthier) trends occurred in both foreign-born and U.S.-born Hispanics. Conclusion This large community-based participatory intervention resulted in more Hispanic residents in the communities taking actions to control high blood pressure. PMID:26656406

  20. The Rakiura Titi Islands Restoration Project: community action to eradicate Rattus rattus and Rattus exulans for ecological restoration and cultural wellbeing

    USGS Publications Warehouse

    McClelland, P.J; Coote, R.; Trow, M.; Hutchins, P.; Nevins, HannahRose M.; Adams, Josh; Newman, J.; Moller, H.

    2011-01-01

    In 2003, a non-profit group, Ka Mate Nga Kiore, was set up to oversee the restoration of four Maori-owned islands off the south coast of Stewart Island, New Zealand. The first step in the restoration was to eradicate ship rats (Rattus rattus) from three islands and Pacific rats (R. exulans) from another. The eradication was funded by the Command Oil Spill Trustee Council which managed the mitigation money from an oil spill off the Californian coast in 1998. The funding was coordinated via Oikonos Ecosystem Knowledge, a non-profit USA group primarily involved in seabird research and restoration. The project was primarily to benefit sooty shearwater (Puffinus griseus) and to sustain a culturally important customary harvest of their chicks by Rakiura Maori. However, like all island eradications, a wide range of other species also benefited from the removal of rats. The New Zealand Department of Conservation provided technical advice and assistance for the planning and implementation of the eradication programme. This paper describes how, with appropriate funding, community and technical support, rodent eradications can be achieved on private islands. In this case, a range of institutions and individuals joined to achieve a common goal that highlighted a significant international conservation action. We urge that more international and local-community-led restoration projects be initiated in the future.

  1. ACTION. Annual Report 1974.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1974. After an introduction that notes accomplishments of the past year, a review of domestic operations discusses such programs as VISTA, University Year for ACTION, National Student Volunteer Program, Foster Grandparent Program, and others according…

  2. Engaging Pediatric Intensive Care Unit (PICU) clinical staff to lead practice improvement: the PICU Participatory Action Research Project (PICU-PAR)

    PubMed Central

    2014-01-01

    Background Despite considerable efforts, engaging staff to lead quality improvement activities in practice settings is a persistent challenge. At British Columbia Children’s Hospital (BCCH), the pediatric intensive care unit (PICU) undertook a new phase of quality improvement actions based on the Community of Practice (CoP) model with Participatory Action Research (PAR). This approach aims to mobilize the PICU ‘community’ as a whole with a focus on practice; namely, to create a ‘community of practice’ to support reflection, learning, and innovation in everyday work. Methodology An iterative two-stage PAR process using mixed methods has been developed among the PICU CoP to describe the environment (stage 1) and implement specific interventions (stage 2). Stage 1 is ethnographic description of the unit’s care practice. Surveys, interviews, focus groups, and direct observations describe the clinical staff’s experiences and perspectives around bedside care and quality endeavors in the PICU. Contrasts and comparisons across participants, time and activities help understanding the PICU culture and experience. Stage 2 is a succession of PAR spirals, using results from phase 1 to set up specific interventions aimed at building the staff’s capability to conduct QI projects while acquiring appropriate technical skills and leadership capacity (primary outcome). Team communication, information, and interaction will be enhanced through a knowledge exchange (KE) and a wireless network of iPADs. Relevance Lack of leadership at the staff level in order to improve daily practice is a recognized challenge that faces many hospitals. We believe that the PAR approach within a highly motivated CoP is a sound method to create the social dynamic and cultural context within which clinical teams can grow, reflect, innovate and feel proud to better serve patients. PMID:24401288

  3. Preparing teachers to create a mainstream science classroom conducive to the needs of English-language learners: A feminist action research project

    NASA Astrophysics Data System (ADS)

    Buck, Gayle; Mast, Colette; Ehlers, Nancy; Franklin, Elizabeth

    2005-11-01

    A feminist action research team, which consisted of a science educator, an English-language learner (ELL) educator, a first-year science teacher, and a graduate assistant, set a goal to work together to explore the process a beginning teacher goes through to establish a classroom conducive to the needs of middle-level ELL learners. The guiding questions of the study were answered by gathering a wealth of data over the course of 5 months and taken from the classroom, planning sessions, and researchers and students. These data were collected by observations, semistructured interviews, and written document reviews. The progressive analysis ultimately revealed that: (a) successful strategies a beginning teacher must utilize for teaching middle-level ELL children in a mainstream classroom involve complex structural considerations that are not part of the teacher's preparation; (b) learning increases for all children, but there are differences in learning achievement between ELL and non-ELL children; and (c) student and peer feedback proved to be an effective means of enhancing the growth of a beginning teacher seeking to increase her skills in teaching ELL learners. The experiences and findings from this project have implications for teacher preparation programs committed to preparing educators to teach science to all children.

  4. Earthquakes in Action: Incorporating Multimedia, Internet Resources, Large-scale Seismic Data, and 3-D Visualizations into Innovative Activities and Research Projects for Today's High School Students

    NASA Astrophysics Data System (ADS)

    Smith-Konter, B.; Jacobs, A.; Lawrence, K.; Kilb, D.

    2006-12-01

    The most effective means of communicating science to today's "high-tech" students is through the use of visually attractive and animated lessons, hands-on activities, and interactive Internet-based exercises. To address these needs, we have developed Earthquakes in Action, a summer high school enrichment course offered through the California State Summer School for Mathematics and Science (COSMOS) Program at the University of California, San Diego. The summer course consists of classroom lectures, lab experiments, and a final research project designed to foster geophysical innovations, technological inquiries, and effective scientific communication (http://topex.ucsd.edu/cosmos/earthquakes). Course content includes lessons on plate tectonics, seismic wave behavior, seismometer construction, fault characteristics, California seismicity, global seismic hazards, earthquake stress triggering, tsunami generation, and geodetic measurements of the Earth's crust. Students are introduced to these topics through lectures-made-fun using a range of multimedia, including computer animations, videos, and interactive 3-D visualizations. These lessons are further enforced through both hands-on lab experiments and computer-based exercises. Lab experiments included building hand-held seismometers, simulating the frictional behavior of faults using bricks and sandpaper, simulating tsunami generation in a mini-wave pool, and using the Internet to collect global earthquake data on a daily basis and map earthquake locations using a large classroom map. Students also use Internet resources like Google Earth and UNAVCO/EarthScope's Jules Verne Voyager Jr. interactive mapping tool to study Earth Science on a global scale. All computer-based exercises and experiments developed for Earthquakes in Action have been distributed to teachers participating in the 2006 Earthquake Education Workshop, hosted by the Visualization Center at Scripps Institution of Oceanography (http

  5. Choosing Actions

    PubMed Central

    Rosenbaum, David A.; Chapman, Kate M.; Coelho, Chase J.; Gong, Lanyun; Studenka, Breanna E.

    2013-01-01

    Actions that are chosen have properties that distinguish them from actions that are not. Of the nearly infinite possible actions that can achieve any given task, many of the unchosen actions are irrelevant, incorrect, or inappropriate. Others are relevant, correct, or appropriate but are disfavored for other reasons. Our research focuses on the question of what distinguishes actions that are chosen from actions that are possible but are not. We review studies that use simple preference methods to identify factors that contribute to action choices, especially for object-manipulation tasks. We can determine which factors are especially important through simple behavioral experiments. PMID:23761769

  6. A Toolkit for Action Research

    ERIC Educational Resources Information Center

    Alber, Sandra M.

    2010-01-01

    This book facilitates the completion of action research studies by providing a series of tasks that guide action researchers from the beginning of a project and selecting a topic for study, to completion of the project and editing final reports. All too often, students and practicing professionals in professional development schools are…

  7. Intentional Action and Action Slips.

    ERIC Educational Resources Information Center

    Heckhausen, Heinz; Beckmann, Jurgen

    1990-01-01

    An explanation of action slips is offered that examines controlled actions in the context of an intentional behavior theory. Actions are considered guided by mentally represented intentions, subdivided into goal intentions and contingent instrumental intentions. Action slips are categorized according to problem areas in the enactment of goal…

  8. Strategies TO reduce time delays in patients with AcuTe coronary heart disease treated with primary PCI—the STOP WATCH study: a multistage action research project

    PubMed Central

    Tödt, Tim; Thylén, Ingela; Alfredsson, Joakim; Swahn, Eva; Janzon, Magnus

    2013-01-01

    Objective To identify, evaluate and reduce system delay times in an ST-elevation myocardial infarction (STEMI) network by targeted reorganisation of logistics and personal feedback to staff on time delays. Design Multistage action research project. Three study phases were used (exploration, tailored intervention and evaluation). Setting Single centre study, Sweden. Patients Consecutive patients (N=156) with prehospital STEMI onset treated with primary percutaneous coronary intervention (PCI). Interventions Areas of delays were identified through participant observations and collaborative discussions. To increase the awareness of delay factors, continuous feedback on time delays was given. Elements of the logistics’ reorganisation were (1) prioritised ECG recording by emergency medical services personnel, (2) central evaluation of ECG in all patients and (3) start of PCI procedure when two of three PCI team members were on site. Multiple key time measurements were made before (N=67) and after (N=89) the intervention. Main outcomes Time difference (minutes) in system delay between the preintervention and postintervention phases. Results Time from first medical contact (FMC) to a patent artery and time from FMC-to-catheter laboratory (cath-lab) arrival decreased by 6 and 12 min, respectively (ns). Time from FMC-to-ECG recording remained unchanged after the intervention. Time from ECG to decision for primary PCI was reduced by 6 min, p=0.004 and time from ECG-to-cath-lab arrival by 11 min, p=0.02. Total time from diagnosis to a patent artery decreased by 11 min (ns). Conclusions Identification of time delays in an STEMI network with awareness of delay factors, reorganisation of logistics and continuous feedback can reduce system delay times significantly. PMID:24002986

  9. Environmental Action.

    ERIC Educational Resources Information Center

    Lott, Jesse; Allen, Rodney F.

    This booklet, a general guide to citizen eco-action, discusses a plan of action on community environmental problems. It offers factors to be considered in any community eco-action situation, but it is not a rigid set of rules. An overview identifies seven key ideas of environmental issues, including the universal participation of all humans in the…

  10. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho. Final report

    SciTech Connect

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    SciTech Connect

    Matthews, M.L. . Uranium Mill Tailings Remedial Action Project Office); Nagel, J. . Div. of Environmental Quality)

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  12. Using Evidence: How Action Learning Can Support Individual and Organisational Learning through Action Research

    ERIC Educational Resources Information Center

    Dewar, Belinda; Sharp, Cathy

    2006-01-01

    This article discusses the use of action learning as a structured and deliberate learning process to support practitioners to implement change in an action research project. It discusses both action learning and action research before describing the context of the study. The article then goes on to discuss how the process of action learning…

  13. Community Action Curriculum Compendium.

    ERIC Educational Resources Information Center

    Duncan, Karen

    This compendium contains descriptions of 59 community action projects that receive academic credit from 48 colleges and universities. Brief descriptions are given of the diverse institutions offering such field work for credit, including information on enrollment and type (i.e., public, private, etc.). Although the characteristics of the programs…

  14. ACTION. Annual Report 1978.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1978. The introduction notes a continued growth in programs and comments on new developments. Older American Volunteer Programs are discussed in the next section, specifically the Retired Senior Volunteer Program, Foster Grandparent Program, and…

  15. Modifications to the Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-10-01

    This modification to the Green River Final Remedial Action Plan (FRAP) represents the changes made to the document in accordance with a joint agreement between the US Department of Energy (DOE) and the US Nuclear Regulatory Commission (NRC) outlined in a letter dated August 7, 1991. As specified in this letter, methylene chloride will no longer be analyzed in groundwater samples collected from on-site monitor wells. All references to methylene chloride sampling have been deleted from the FRAP, as indicated by the pages in Section 2.0 of this document.

  16. Action Learning.

    ERIC Educational Resources Information Center

    1996

    These four papers were presented at a symposium on action learning moderated by Lex Dilworth at the 1996 conference of the Academy of Human Resource Development. "Developing an Infrastructure for Individual and Organizational Change: Transfer of Learning from an Action Reflection Learning (ARL) Program" (ARL Inquiry) reports findings from a study…

  17. Give Water a Hand. Farm and Ranch Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation on a farm or ranch, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  18. Say It Loud: An Action Research Project Examining the Afrivisual and Africology, Looking for Alternative African American Community College Teaching Strategies

    ERIC Educational Resources Information Center

    Mitchell, Daniel E.

    2012-01-01

    For this study, the researcher sought to implement a visual arts-based Afrivisual to help inspire, motivate and empower African American students in gaining a culturally relevant education in Euro-American-centered schools. Using the Afrivisual in this work as an action-oriented tool the researcher sought to expose African American students to an…

  19. Studies in Teaching: 2012 Research Digest. Action Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, June 29, 2012)

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    2012-01-01

    This document presents the proceedings of the 17th Annual Research Forum held June 29, 2012, at Wake Forest University in Winston-Salem, North Carolina. Included herein are the following 25 action research papers: (1) "Reading and Writing": A Study Comparing the Strengths of Peer Review and Visible Author Writing Strategies (Elizabeth Behar); (2)…

  20. Studies in Teaching: 2013 Research Digest. Action Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, June 26, 2013)

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    2013-01-01

    This document presents the proceedings of the 18th Annual Research Forum held June 26, 2013, at Wake Forest University in Winston-Salem, North Carolina. Included are the following 13 action research papers: (1) Developing Oral Language Ability in the Secondary Spanish Classroom Using the Interpersonal and Presentational Modes of Communication…

  1. 77 FR 50207 - Notice of Final Federal Agency Actions on Project: I-5: Glendale-Hugo Paving/Sexton Climbing Lane...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ...) 316-2559; Dominic Yballe, US Army Corps of Engineers, P.O. Box 2946, Portland, Oregon 97208-2946... Conservation and Recovery Act (RCRA), [42 U.S.C. 6901- 6992(k)]. 9. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice...

  2. Preparing Teachers to Create a Mainstream Science Classroom Conducive to the Needs of English-Language Learners: A Feminist Action Research Project

    ERIC Educational Resources Information Center

    Buck, Gayle; Mast, Colette; Ehlers, Nancy; Franklin, Elizabeth

    2005-01-01

    A feminist action research team, which consisted of a science educator, an English-language learner (ELL) educator, a first-year science teacher, and a graduate assistant, set a goal to work together to explore the process a beginning teacher goes through to establish a classroom conducive to the needs of middle-level ELL learners. The guiding…

  3. Studies in Teaching: 2014 Research Digest. Action Research Projects Presented at Annual Research Forum (Winston-Salem, NC, June 26, 2014)

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    2014-01-01

    This document presents the proceedings of the 19th Annual Research Forum held June 26, 2014, at Wake Forest University in Winston-Salem, North Carolina. Included are the following 17 action research papers: (1) Using Voices to Change Minds: Oral Performance and Poetry in the English Classroom (Erika Bunpermkoon), (2) Imagining Audiences: The Use…

  4. Case Study on Hajitkoum, Migrant Cultural Action Group (Brussels, Belgium). The CDCC's Project No. 7: "The Education and Cultural Development of Migrants."

    ERIC Educational Resources Information Center

    Cetinsoy, Melih

    Four years of activities (1978-82) of Hajitkoum (Migrant Cultural Action Group), a predominantly Moroccan multicultural group of young immigrants based in a suburb of Brussels, are described. The group has the ultimate goal of providing the immigrant community with cadres, drawn from its young generations, who will be able to take on political and…

  5. Studies in Teaching: 2015 Research Digest. Action Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, June 25, 2015)

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    2015-01-01

    This document presents the proceedings of the 20th Annual Research Forum held June 25, 2015, at Wake Forest University in Winston-Salem, North Carolina. Included are the following 21 action research papers: (1) History Lives! The Use of Simulations in a High School Social Studies Classroom (Lydia Adkins); (2) Using Francophone Music in the High…

  6. Creating Open Education Resources for Teaching and Community Development through Action Research: An Overview of the Makerere AgShare Project

    ERIC Educational Resources Information Center

    Kaneene, John B.; Ssajjakambwe, Paul; Kisaka, Stevens; Miller, RoseAnn; Kabasa, John D.

    2013-01-01

    The AgShare Phase I Program, conducted at Makerere University, Kampala, Uganda, was formed to create open education resources for teaching and community development through action research. The study was conducted by an interdisciplinary team of investigators from fields of veterinary medicine and agri-business. Two master of science students…

  7. Assessing Action-Research Projects within Formal Academic Programmes: Using Elliott's Context-Related Criteria to Resolve the Rigour versus Flexibility Dilemma

    ERIC Educational Resources Information Center

    McMahon, Tim; Jefford, Elaine

    2009-01-01

    An action-research account of a successful improvement to practice presented for assessment within a taught MA in education was given a fail grade. The student's challenge to this decision led the university assessor to re-evaluate and change his own practice in assessment in much the same way as the student had in the original report. The…

  8. Action perception predicts action performance

    PubMed Central

    Bailey, Heather R.; Kurby, Christopher A.; Giovannetti, Tania; Zacks, Jeffrey M.

    2013-01-01

    Everyday action impairments often are observed in demented older adults, and they are common potential barriers to functional independence. We evaluated whether the ability to segment and efficiently encode activities is related to the ability to execute activities. Further, we evaluated whether brain regions important for segmentation also were important for action performance. Cognitively healthy older adults and those with very mild or mild dementia of the Alzheimer's type watched and segmented movies of everyday activities and then completed the Naturalistic Action Test. Structural MRI was used to measure volume in the dorsolateral prefrontal cortex (DLPFC), medial temporal lobes (MTL), posterior cortex, and anterior cingulate cortex (ACC). Dementia status and the ability to segment everyday activities strongly predicted naturalistic action performance, and MTL volume largely accounted for this relationship. In addition, the current results supported the Omission-Commission Model: Different cognitive and neurological mechanisms predicted different types of action error. Segmentation, dementia severity, and MTL volume predicted everyday omission errors, DLPFC volume predicted commission errors, and ACC volume predicted action additions. These findings suggest that event segmentation may be critical for effective action production, and that the segmentation and production of activities may recruit the same event representation system. PMID:23851113

  9. Promoting Quality for Teacher Action Research: Lessons Learned from Science Teachers' Action Research

    ERIC Educational Resources Information Center

    Capobianco, Brenda M.; Feldman, Allan

    2006-01-01

    In this article we explore the concept of quality in teacher action research by re-examining our participation with science teachers in several different collaborative action research projects. We conducted second-order action research and generated a series reflexive conditions for promoting and ensuring quality action research. We assert that a…

  10. Determination, by using GPR, of the volumetric water content in structures, sub-structures, foundations and soil - ongoing activities in Working Project 2.5 of COST Action TU1208

    NASA Astrophysics Data System (ADS)

    Tosti, Fabio; Slob, Evert

    2015-04-01

    This work will endeavour to review the current status of research activities carried out in Working Project 2.5 'Determination, by using GPR, of the volumetric water content in structures, sub-structures, foundations and soil' within the framework of Working Group 2 'GPR surveying of pavements, bridges, tunnels and buildings; underground utility and void sensing' of the COST (European COoperation in Science and Technology) Action TU1208 'Civil Engineering Applications of Ground Penetrating Radar' (www.GPRadar.eu). Overall, the Project includes 55 Participants from over 21 countries representing 33 Institutions. By considering the type of Institution, a percentage of 64% (35 units) comes from the academic world, while Research Centres and Companies include, respectively, the 27% (15 units) and 9% (5 units) of Institutions. Geographically speaking, Europe is the continent most represented with 18 out of 21 countries, followed by Africa (2 countries) and Asia (1 country). In more details and according to the Europe sub-regions classification provided by the United Nations, Southern Europe includes 39% of countries, Western Europe 27%, while Northern and Eastern Europe are equally present with 17% of countries each. Relying on the main purpose of Working Project 2.5, namely, the ground-penetrating radar-based evaluation of volumetric water content in structures, substructures , foundations, and soils, four main issues have been overall addressed over the first two years of activities. The first one, has been related to provide a comprehensive state of the art on the topic, due to the wide-ranging applications covered in the main disciplines of civil engineering, differently demanding. In this regard, two main publications reviewing the state of the art have been produced [1,2]. Secondly, discussions among Working Group Chairs and other Working Project Leaders have been undertaken and encouraged to avoid the risk of overlapping amongst similar topics from other Working

  11. Principles for Participatory Action Research.

    ERIC Educational Resources Information Center

    McTaggart, Robin

    1991-01-01

    Nine principles of participatory action research (PAR) are identification of individual and collective projects; changing power distribution; changing group and institutional culture; acting and reflecting; unifying intellectual and practical projects; producing knowledge; engaging the politics; using methodological resources; and creating theory.…

  12. Action, human.

    PubMed

    Russo, M T

    2010-01-01

    The term "human action" designates the intentional and deliberate movement that is proper and exclusive to mankind. Human action is a unified structure: knowledge, intention or volition, deliberation, decision or choice of means and execution. The integration between these dimensions appears as a task that demands strength of will to achieve the synthesis of self-possession and self-control that enables full personal realisation. Recently, the debate about the dynamism of human action has been enriched by the contribution of neurosciences. Thanks to techniques of neuroimaging, neurosciences have expanded the field of investigation to the nature of volition, to the role of the brain in decision-making processes and to the notion of freedom and responsibility. PMID:20393686

  13. Evaluation of Community College Student Affirmative Action Transition Projects: A Report to the Legislature in Response to Assembly Bill 1305 (1981). Commission Report 83-36.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    This six-part evaluative report describes and assesses three projects, funded by the Office of the Chancellor of the California Community Colleges, designed to facilitate the transition of low-income, minority, and handicapped students from two- to four-year colleges. Part One provides information on the legislative mandate and goals for the…

  14. Action Research

    ERIC Educational Resources Information Center

    Milton-Brkich, Katie Lynn; Shumbera, Kristen; Beran, Becky

    2010-01-01

    Defined as "any systemic inquiry conducted by teachers... for the purpose of gathering information about how their particular schools operate, how they teach, and how their students learn" (Mertler, 2009), "action research" is empowering and professional research done by teachers to inform and improves their own practices. Although there are many…

  15. Project: "Project!"

    ERIC Educational Resources Information Center

    Grayson, Katherine

    2007-01-01

    In November 2006, the editors of "Campus Technology" launched their first-ever High-Resolution Projection Study, to find out if the latest in projector technology could really make a significant difference in teaching, learning, and educational innovation on US campuses. The author and her colleagues asked campus educators, technologists, and…

  16. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  17. A Teacher's Professional Development through Action Research

    ERIC Educational Resources Information Center

    Sakshaug, Lynae E.; Wohlhuter, Kay A.; Lach, Tisa

    2008-01-01

    Action research is a process that classroom teachers undertake to reflect upon and improve their own teaching. This study followed an elementary teacher's two-year experience with an action research project in which her middle school students played mathematical-related games. Through the teacher's involvement in this project, her core beliefs…

  18. Teachers in Action Research: Assumptions and Potentials

    ERIC Educational Resources Information Center

    Li, Yuen-Ling

    2008-01-01

    Research literature has long indicated that action research may stimulate practitioners themselves to actively evaluate the quality of their practice. This study is designed to report the use of action research for the development of early years professional practice by analyzing the pre-project and the post-project video-filmed teaching events.…

  19. Supporting Systematic Change through Action Research.

    ERIC Educational Resources Information Center

    Holm, Daniel T.; Hunter, Karen; Welling, Judith

    This paper examines how a series of action research projects, supported and guided through a university-public elementary school partnership program, began. It also presents the content and impact of the action research projects from the voices of a university professor, classroom teacher, and principal. The partnership promoted study groups which…

  20. Citizen's actions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The role played by individual citizens as consumers of energy was examined, with emphasis on studying ways in which their action could result in energy conservation. It was shown that there are ways that energy can be conserved in this way, with citizens acting either individually or in groups. The potential savings are significant, but the actual savings may be quite small. The citizens need to be motivated to save and to believe in a conservation ethic; developing such an ethic is difficult, and perhaps not responsive to the shotgun approach now being attempted. The true course of action may be to synthesize new societal structures that provide the maximum evolution of culture within the limitation of scarce energy resources.

  1. Actionable Nuggets

    PubMed Central

    McColl, Mary Ann; Aiken, Alice; Smith, Karen; McColl, Alexander; Green, Michael; Godwin, Marshall; Birtwhistle, Richard; Norman, Kathleen; Brankston, Gabrielle; Schaub, Michael

    2015-01-01

    Abstract Objective To present the results of a pilot study of an innovative methodology for translating best evidence about spinal cord injury (SCI) for family practice. Design Review of Canadian and international peer-reviewed literature to develop SCI Actionable Nuggets, and a mixed qualitative-quantitative evaluation to determine Nuggets’ effect on physician knowledge of and attitudes toward patients with SCI, as well as practice accessibility. Setting Ontario, Newfoundland, and Australia. Participants Forty-nine primary care physicians. Methods Twenty Actionable Nuggets (pertaining to key health issues associated with long-term SCI) were developed. Nugget postcards were mailed weekly for 20 weeks to participating physicians. Prior knowledge of SCI was self-rated by participants; they also completed an online posttest to assess the information they gained from the Nugget postcards. Participants’ opinions about practice accessibility and accommodations for patients with SCI, as well as the acceptability and usefulness of Nuggets, were assessed in interviews. Main findings With Actionable Nuggets, participants’ knowledge of the health needs of patients with SCI improved, as knowledge increased from a self-rating of fair (58%) to very good (75%) based on posttest quiz results. The mean overall score for accessibility and accommodations in physicians’ practices was 72%. Participants’ awareness of the need for screening and disease prevention among this population also increased. The usefulness and acceptability of SCI Nugget postcards were rated as excellent. Conclusion Actionable Nuggets are a knowledge translation tool designed to provide family physicians with concise, practical information about the most prevalent and pressing primary care needs of patients with SCI. This evidence-based resource has been shown to be an excellent fit with information consumption processes in primary care. They were updated and adapted for distribution by the Canadian

  2. Androgen action.

    PubMed

    Werner, Ralf; Holterhus, Paul-Martin

    2014-01-01

    Androgens are important for male sex development and physiology. Their actions are mediated by the androgen receptor (AR), a ligand-dependent nuclear transcription factor. The activity of the AR is controlled at multiple stages due to ligand binding and induced structural changes assisted by the foldosome, compartmentalization, recruitment of coregulators, posttranslational modifications and chromatin remodeling, leading to subsequent transcription of androgen-responsive target genes. Beside these short-term androgen actions, there is phenomenological and experimental evidence of long-term androgen programming in mammals and in the human during sensitive programming time windows, both pre- and postnatally. At the molecular level, research into androgen insensitivity syndrome has unmasked androgen programming at the transcriptome level, in genital fibroblasts and peripheral blood mononuclear cells, and at the epigenome level. Androgens are crucial for male sex development and physiology during embryogenesis, at puberty and in adult life. Testosterone and its more potent metabolite, dihydrotestosterone, which is converted from testosterone within the target cell by 5α-reductase II, are the main androgens involved in male sex differentiation. Androgen action is mediated by a single AR. The AR belongs to the nuclear receptor 3 group C, composed of the glucocorticoid receptor (NR3C1), mineralocorticoid receptor (NR3C2), progesterone receptor (NR3C3) and AR (NR3C4), and acts as a ligand-dependent transcription factor. PMID:25247642

  3. Involving migrants in the development of guidelines for communication in cross-cultural general practice consultations: a participatory learning and action research project

    PubMed Central

    O'Reilly-de Brún, Mary; MacFarlane, Anne; de Brún, Tomas; Okonkwo, Ekaterina; Bonsenge Bokanga, Jean Samuel; Manuela De Almeida Silva, Maria; Ogbebor, Florence; Mierzejewska, Aga; Nnadi, Lovina; van den Muijsenbergh, Maria; van Weel-Baumgarten, Evelyn; van Weel, Chris

    2015-01-01

    Objective The aim of this research was to involve migrants and other key stakeholders in a participatory dialogue to develop a guideline for enhancing communication in cross-cultural general practice consultations. In this paper, we focus on findings about the use of formal versus informal interpreters because dialogues about these issues emerged as central to the identification of recommendations for best practice. Design This qualitative case study involved a Participatory Learning and Action (PLA) research methodology. Participants The sample comprised 80 stakeholders: 51 from migrant communities; 15 general practitioners (GPs) and general practice staff; 7 established migrants as peer researchers; 5 formal, trained interpreters; and 2 service planners from the national health authority. Setting Galway, Ireland. Results There was 100% consensus across stakeholder groups that while informal interpreters have uses for migrants and general practice staff, they are not considered acceptable as best practice. There was also 100% consensus that formal interpreters who are trained and working as per a professional code of practice are acceptable as best practice. Conclusions Policymakers and service planners need to work in partnership with service providers and migrants to progress the implementation of professional, trained interpreters as a routine way of working in general practice. PMID:26391628

  4. Research on the water hammer protection of the long distance water supply project with the combined action of the air vessel and over-pressure relief valve

    NASA Astrophysics Data System (ADS)

    Li, D. D.; Jiang, J.; Zhao, Z.; Yi, W. S.; Lan, G.

    2013-12-01

    We take a concrete pumping station as an example in this paper. Through the calculation of water hammer protection with a specific pumping station water supply project, and the analysis of the principle, mathematical models and boundary conditions of air vessel and over-pressure relief valve we show that the air vessel can protect the water conveyance system and reduce the transient pressure damage due to various causes. Over-pressure relief valve can effectively reduce the water hammer because the water column re-bridge suddenly stops the pump and prevents pipeline burst. The paper indicates that the combination set of air vessel and over-pressure relief valve can greatly reduce the quantity of the air valve and can eliminate the water hammer phenomenon in the pipeline system due to the vaporization and water column separation and re-bridge. The conclusion could provide a reference for the water hammer protection of long-distance water supply system.

  5. Action Learning: Avoiding Conflict or Enabling Action

    ERIC Educational Resources Information Center

    Corley, Aileen; Thorne, Ann

    2006-01-01

    Action learning is based on the premise that action and learning are inextricably entwined and it is this potential, to enable action, which has contributed to the growth of action learning within education and management development programmes. However has this growth in action learning lead to an evolution or a dilution of Revan's classical…

  6. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  7. Youth action research in the marine environment: A case study analysis of selected education projects in Hawai'i, United States of America

    NASA Astrophysics Data System (ADS)

    Zicus, Sandra A.

    The marine environment has always been extremely important to the human inhabitants of the Hawaiian Islands. Today, the ocean environment around Hawai'i is no less important, but it is far more threatened. Coastal and urban development, overfishing, introduction of alien species, and other commercial and recreational uses pose serious risks to coastal and marine ecosystems. There is a recognized need for greater public awareness and understanding of the importance of marine and coastal ecosystems. Involving children actively in the care and management of community resources is an essential factor for long-term societal change in environmental attitudes and behavior. Agencies and organizations in Hawai'i offer a wide range of marine education programs and materials aimed at children. However, there has been little assessment of their overall effectiveness, or analysis of factors that encourage or impede their success. The goal of this research was to begin to address this gap. The first stage of the research examined the perceptions and attitudes of Hawai'i resource managers and educators toward youth involvement in coastal and marine protection, and to answer the question "What is currently being done and by whom?" The second stage examined in detail three different programs that represent a range of approaches and age levels, and include two public charter schools (one elementary and one high school) and a nonprofit after-school program that drew youth from four area high schools. The case study research was conducted over the course of the 2001--2002 school year by means of observations, participant-observations, interviews, focus groups, and reviews of written and electronic media. The case studies were exploratory in nature and differed in their settings, age groups, administration, size, and focus. However, an analysis using the assessment rubric revealed broad patterns common to all three projects. This allowed the development of analytical generalizations

  8. Determination, by using GPR, of the volumetric water content in structures, sub-structures, foundations and soil - ongoing activities in Working Project 2.5 of COST Action TU1208

    NASA Astrophysics Data System (ADS)

    Tosti, Fabio; Slob, Evert

    2015-04-01

    This work will endeavour to review the current status of research activities carried out in Working Project 2.5 'Determination, by using GPR, of the volumetric water content in structures, sub-structures, foundations and soil' within the framework of Working Group 2 'GPR surveying of pavements, bridges, tunnels and buildings; underground utility and void sensing' of the COST (European COoperation in Science and Technology) Action TU1208 'Civil Engineering Applications of Ground Penetrating Radar' (www.GPRadar.eu). Overall, the Project includes 55 Participants from over 21 countries representing 33 Institutions. By considering the type of Institution, a percentage of 64% (35 units) comes from the academic world, while Research Centres and Companies include, respectively, the 27% (15 units) and 9% (5 units) of Institutions. Geographically speaking, Europe is the continent most represented with 18 out of 21 countries, followed by Africa (2 countries) and Asia (1 country). In more details and according to the Europe sub-regions classification provided by the United Nations, Southern Europe includes 39% of countries, Western Europe 27%, while Northern and Eastern Europe are equally present with 17% of countries each. Relying on the main purpose of Working Project 2.5, namely, the ground-penetrating radar-based evaluation of volumetric water content in structures, substructures , foundations, and soils, four main issues have been overall addressed over the first two years of activities. The first one, has been related to provide a comprehensive state of the art on the topic, due to the wide-ranging applications covered in the main disciplines of civil engineering, differently demanding. In this regard, two main publications reviewing the state of the art have been produced [1,2]. Secondly, discussions among Working Group Chairs and other Working Project Leaders have been undertaken and encouraged to avoid the risk of overlapping amongst similar topics from other Working

  9. Action Research in Action: Curricular Articulation and Integrated Instruction.

    ERIC Educational Resources Information Center

    Arnold, Douglas E.

    1998-01-01

    During the 1995-96 school year, the author (a principal) and three teachers developed an action research project at a Virginia high school. The idea was to increase curricular articulation among departments and connections among disciplines (art, physics, and geometry) at the school. Teachers overcame two major barriers: lack of common planning…

  10. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  11. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  12. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  13. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  14. How Can Action Learning Contribute to Social Capital?

    ERIC Educational Resources Information Center

    Pedler, Mike; Attwood, Margaret

    2011-01-01

    This paper explores the contribution that action learning can make to the formation of social capital via experiences of action learning projects in NHS Pathology Services in the UK. The paper describes the development of action learning practice in recent years, reviews the notion of social capital and considers how action learning might…

  15. Inter-Action's Environmental Programmes.

    ERIC Educational Resources Information Center

    Knights, John

    1984-01-01

    Describes the work of Inter-Action, a voluntary organization funded to explore ways in which creative arts can be applied to the resolution of social and environmental problems of the inner-city. Environmental projects for neighborhood residents focus on city farms, community architecture, family food production, concrete sculptures, and…

  16. Action Learning through Indigenous Literature

    ERIC Educational Resources Information Center

    Beveridge, Lorraine; McLeod, Julie Hinde

    2009-01-01

    The action learning project described tells about one primary school's journey in addressing issues of social justice and equity in relation to Aboriginal education in Australia. The setting was a new regional primary school in New South Wales, Australia. The school needed to get Aboriginal Education on the agenda, in line with the mandatory…

  17. Team Challenge and Action Learning

    ERIC Educational Resources Information Center

    Holmes, Mary

    2010-01-01

    This article describes how action learning can be accompanied by a project to encourage shared learning about organisation culture, the external environment, political context and team dynamics, while allowing space for personal issues. It drives forward reflective practice and encourages sets to deliver a tangible pay-back to the organisation.…

  18. Ecology and Energy Action Pack.

    ERIC Educational Resources Information Center

    McDonald's Corp., Oak Brook, IL.

    One of five McDonald's Action Packs, these elementary school-level instructional materials are for use as an introduction to existing units of study, supplements to a textbook, or a source of special projects for environmental education. Contents include these six units: Make Your Own Ecology Mini-spinner, Let's Look at a Food Chain, Drip the…

  19. Action Research and ICT Implementation

    ERIC Educational Resources Information Center

    Krumsvik, Rune

    2012-01-01

    This emancipatory action research study investigates implementation of information and communication technology (ICT) in schools. The case study examined retrospectively was part of a Norwegian ICT project called PILOT, the focus of which concerns the impact on school development of a locally developed Internet subject portal and study periods.…

  20. Remedial Action Contacts Directory - 1997

    SciTech Connect

    1997-05-01

    This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

  1. Report on Project Action Sheet PP05 task 3 between the U.S. Department of Energy and the Republic of Korea Ministry of Education, Science, and Technology (MEST).

    SciTech Connect

    Snell, Mark Kamerer

    2013-01-01

    This report documents the results of Task 3 of Project Action Sheet PP05 between the United States Department of Energy (DOE) and the Republic of Korea (ROK) Ministry of Education, Science, and Technology (MEST) for Support with Review of an ROK Risk Evaluation Process. This task was to have Sandia National Laboratories collaborate with the Korea Institute of Nuclear Nonproliferation and Control (KINAC) on several activities concerning how to determine the Probability of Neutralization, PN, and the Probability of System Effectiveness, PE, to include: providing descriptions on how combat simulations are used to determine PN and PE; comparisons of the strengths and weaknesses of two neutralization models (the Neutralization.xls spreadsheet model versus the Brief Adversary Threat-Loss Estimator (BATLE) software); and demonstrating how computer simulations can be used to determine PN. Note that the computer simulation used for the demonstration was the Scenario Toolkit And Generation Environment (STAGE) simulation, which is a stand-alone synthetic tactical simulation sold by Presagis Canada Incorporated. The demonstration is provided in a separate Audio Video Interleave (.AVI) file.

  2. Action Research: Informing Professional Practice within Schools

    ERIC Educational Resources Information Center

    Hine, Gregory S. C.; Lavery, Shane D.

    2014-01-01

    This research paper explores the experiences of three teacher-researchers, "Simone", "Damian" and "Michael", who undertook an action research project in their respective schools as part of their postgraduate studies. The paper initially outlines the construct of action research in the light of its applicability to…

  3. Action Research in Graduate Management Research Programs.

    ERIC Educational Resources Information Center

    Perry, Chad; Zuber-Skerritt, Ortun

    1992-01-01

    It is proposed that action research, as distinguished from traditional research, has a role in graduate management education. It is suggested that the former is more appropriate for developing managerial competencies. Differences between master's-level and doctoral-level action research projects are noted, and related issues for curriculum design…

  4. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.605 Approval actions. (a) Authorization to proceed with...

  5. 33 CFR 230.8 - Emergency actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Emergency actions include Flood Control and Coastal Emergencies Activities pursuant to Pub. L. 84-99, as amended, and projects constructed under sections 3 of the River and Harbor Act of 1945 or 14 of the Flood Control Act of 1946 of the Continuing Authorities Program. When possible, emergency actions...

  6. Science Teacher Development through Collaborative Action Research

    ERIC Educational Resources Information Center

    Fazio, Xavier; Melville, Wayne

    2008-01-01

    This article explores the views and actions of four science teachers participating in a collaborative action research project. A qualitative case study approach was used to describe and analyze the development of these teachers. This development initially involved the teachers critically comparing their extant practices to current developments in…

  7. Affirmative Action for Women: Diagnostic Report.

    ERIC Educational Resources Information Center

    Gottheil, Susan

    Developed as part of a government-sponsored project to encourage and facilitate the voluntary implementation of affirmative action for women at Vanier College in Montreal, Canada, this report analyzes the current status of female employees at the institution. Chapter I discusses the college's commitment to affirmative action, the problem of…

  8. Effects of Security actions

    NASA Astrophysics Data System (ADS)

    Bergman, Ramona; Andersson-Sköld, Yvonne; Nyberg, Lars; Johansson, Magnus

    2010-05-01

    In a project funded by the Swedish Civil Contingencies Agency, the effort and work to reduce different kinds of accidents are being evaluated. The project wants to illuminate the links between actions and outcome, so we can learn from today's performance and in the future select more effective measures and overall deal with accidents more efficiently. The project ESS covers the field of frequent accidents such as sliding accidents at home, in house fires and less common accidents such as chemical and land fill accidents up to even more rare accidents such as natural accidents and hazards. In the ESS project SGI (Swedish geotechnical institute) will evaluate the work and effort concerning various natural hazards limited to landslides, erosion and flooding. The aim is to investigate how municipalities handle, especially prevention, of such natural disasters today. The project includes several aspects such as: • which are the driving forces for risk analysis in a municipality • do one use risk mapping (and what type) in municipal risk analysis • which aspects are most important when selecting preventive measures • in which way do one learn from past accidents • and from previous accidents elsewhere, by for example use existing databases • etc There are many aspects that play a role in a well-functioning safety promotion work. The overall goal is to examine present work and activities, highlight what is well functioning and identify weak points. The aim is to find out where more resources are needed and give suggestions for a more efficient security work. This includes identification of the most efficient "tools" in use or needed. Such tools can be education, directives, funding, more easily available maps and information regarding previous accidents and preventive measures etc. The project will result in recommendations for more effective ways to deal with landslides, erosion and flooding. Since different kinds of problems can occur depending on level of

  9. Action Research: Order Out of Chaos.

    ERIC Educational Resources Information Center

    Geffen, Mitzi

    2002-01-01

    Describes on Israeli English-as-a-Foreign-Language teacher's action research project that focused on how to teach reading comprehension in English to a class of ninth grade boys. Outlines the teacher's goals, implementation of the project, and thoughts on the outcomes. (Author/VWL)

  10. Endangered Threads: Socially Committed Community Art Action

    ERIC Educational Resources Information Center

    Timm-Bottos, Janis

    2011-01-01

    This article describes a 9-month community action project that took the form of an art studio located in a thrift store. The purpose of the project was to creatively reduce clothing fabric waste from unused donations, and also to document the social justice and ecological issues involved in clothing production and distribution. Collaboration with…

  11. Integrated Project Management System description. [UMTRAP Project

    SciTech Connect

    Not Available

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  12. Action Learning at Work.

    ERIC Educational Resources Information Center

    Mumford, Alan, Ed.

    This book contains 34 papers examining the theory, process, and outcomes of action learning at work. The following papers are included: "An Introduction to the Text" (Alan Mumford); "The Learning Equation" (Reg Revans); "Action Learning as a Vehicle for Learning" (Alan Mumford); "Placing Action Learning and Action Research in Context" (Cliff…

  13. Action Research Facilitator's Handbook.

    ERIC Educational Resources Information Center

    Caro-Bruce, Cathy

    This handbook is a roadmap for action research facilitators to help groups as they work through the research process. It offers quotations, handouts, strategies, resources, and insights from actual experiences. The sections of the handbook follow the action research cycle, focusing on: "What is Action Research?"; "What is the Action Research…

  14. Participatory Action Research: Integrating Community Occupational Therapy Practice and Research.

    ERIC Educational Resources Information Center

    Cockburn, Lynn; Trentham, Barry

    2002-01-01

    Projects involving mental health clients receiving occupational therapy and senior citizens engaged in capacity building illustrate steps in the participatory action research (PAR) process: issue identification and planning; investigation and action; action, reflection, and modification cycles; and knowledge creation and change. Challenges and…

  15. Action Research: A Methodology for Change and Development

    ERIC Educational Resources Information Center

    Somekh, Bridget

    2005-01-01

    This book presents a fresh view of action research as a methodology uniquely suited to researching the processes of innovation and change. Drawing on twenty-five years' experience of leading or facilitating action research projects, Bridget Somekh argues that action research can be a powerful systematic intervention, which goes beyond describing,…

  16. Teachers' Action Research in a Culture of Performativity

    ERIC Educational Resources Information Center

    Cain, Tim; Harris, Richard

    2013-01-01

    In a culture of performativity, action research offers teachers an opportunity to step back and reflect on their practice. This paper reports on a collaborative project carried out between a university and a secondary school in England, in which the university staff supported an action research project within the school. Five school teachers…

  17. Getting Girls in the Game: Action Research in the Gymnasium

    ERIC Educational Resources Information Center

    Robinson, Daniel B.

    2013-01-01

    This article presents an action research project focused on improving physical education (PE) for adolescent female students. One university researcher, three male PE teachers, and 13 of their most disengaged female students participated in the one-year, two-cycle, action research project. The process and results are offered so that future PE…

  18. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans...

  19. Inferences about Action Engage Action Systems

    ERIC Educational Resources Information Center

    Taylor, Lawrence J.; Lev-Ari, Shiri; Zwaan, Rolf A.

    2008-01-01

    Verbal descriptions of actions activate compatible motor responses [Glenberg, A. M., & Kaschak, M. P. (2002). Grounding language in action. "Psychonomic Bulletin & Review, 9", 558-565]. Previous studies have found that the motor processes for manual rotation are engaged in a direction-specific manner when a verb disambiguates the direction of…

  20. Project CAPABLE: Model Unit.

    ERIC Educational Resources Information Center

    Madawaska School District, ME.

    Project CAPABLE (Classroom Action Program: Aim: Basic Learning Effectiveness) is a classroom approach which integrates the basic learning skills with content. The goal of the project is to use basic learning skills to enhance the learning of content and at the same time use the content to teach basic learning skills. This manual illustrates how…

  1. Fundred Dollar Bill Project

    ERIC Educational Resources Information Center

    Rubin, Mary

    2009-01-01

    This article describes the Fundred Dollar Bill Project which is an innovative artwork made of millions of drawings. This creative collective action is intended to support Operation Paydirt, an extraordinary art/science project uniting three million children with educators, scientists, healthcare professionals, designers, urban planners, engineers,…

  2. BI Project Success

    ERIC Educational Resources Information Center

    Tracey, Graham; Riha, James

    2009-01-01

    Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…

  3. Complete action for open superstring field theory

    NASA Astrophysics Data System (ADS)

    Kunitomo, Hiroshi; Okawa, Yuji

    2016-02-01

    We construct a complete action for open superstring field theory that includes the Neveu-Schwarz sector and the Ramond sector. For the Neveu-Schwarz sector, we use the string field in the large Hilbert space of the superconformal ghost sector, and the action in the Neveu-Schwarz sector is the same as the Wess-Zumino-Witten-like action of the Berkovits formulation. For the Ramond sector, it is known that the BRST cohomology on an appropriate subspace of the small Hilbert space reproduces the correct spectrum, and we use the string field projected to this subspace. We show that the action is invariant under gauge transformations that are consistent with the projection for the string field in the Ramond sector.

  4. Mental action simulation synchronizes action-observation circuits across individuals.

    PubMed

    Nummenmaa, Lauri; Smirnov, Dmitry; Lahnakoski, Juha M; Glerean, Enrico; Jääskeläinen, Iiro P; Sams, Mikko; Hari, Riitta

    2014-01-15

    A frontoparietal action-observation network (AON) has been proposed to support understanding others' actions and goals. We show that the AON "ticks together" in human subjects who are sharing a third person's feelings. During functional magnetic resonance imaging, 20 volunteers watched movies depicting boxing matches passively or while simulating a prespecified boxer's feelings. Instantaneous intersubject phase synchronization (ISPS) was computed to derive multisubject voxelwise similarity of hemodynamic activity and inter-area functional connectivity. During passive viewing, subjects' brain activity was synchronized in sensory projection and posterior temporal cortices. Simulation induced widespread increase of ISPS in the AON (premotor, posterior parietal, and superior temporal cortices), primary and secondary somatosensory cortices, and the dorsal attention circuits (frontal eye fields, intraparietal sulcus). Moreover, interconnectivity of these regions strengthened during simulation. We propose that sharing a third person's feelings synchronizes the observer's own brain mechanisms supporting sensations and motor planning, thereby likely promoting mutual understanding. PMID:24431433

  5. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials.

  6. Nuclear facility decommissioning and site remedial actions

    SciTech Connect

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  7. Less chalk more action

    NASA Astrophysics Data System (ADS)

    Mitriceski Andelkovic, Bojana; Jovic, Sladjana

    2016-04-01

    Less chalk more action Education should not be a mechanical system that operates according to the principles of the orders and implementation. Education should respect the basic laws of the develop and progress. Curiosity is the engine of achievement and children spontaneously and happily learn only if they get interested, if teacher wake up and stimulate their creativity and individuality. We would like to present classes that are realized as thematic teaching with several subjects involved: chemistry, geography, math, art and biology. Classes were organized for students at age from 10 to 13 years, every month during autumn and winter 2015. Better students identified themselves as teachers and presented peer education .Teachers were monitoring the process of teaching and help to develop links between younger and older students, where older students were educators to younger students. Also one student with special needs was involved in this activities and was supported by other students during the workshops The benefit from this project will be represented with evaluation marks. Evaluation table shows that group of ten students(age 10 to13 years) which are selected in October as children with lack of motivation for learning, got better marks, at the end of January , then they had it in the beginning of the semester.

  8. Mobilizing grassroots action.

    PubMed

    1995-01-01

    Zero Population Growth, Inc. (ZPG), was very busy in 1994 spreading its message about the dangers of rapid population growth. ZPG's Field and Outreach Program is vital to the success of the organization. Organization activists staffed tables at more than 170 events in 1994, while the Speakers Network gave 159 presentations. ZPG was represented on Earth Day, World Population Day, during World Population Awareness Week, and at Cairo town meetings, as well as at the HORDE rock festival and the 25th anniversary of the Woodstock Music Festival. Campus contacts developed at these latter two concerts formed the basic for ZPG's Campus Outreach Project. In 1994, the Field department focused upon the International Conference on Population and Development to be held in Cairo, Egypt. ZPG encouraged people to get involved in conference preparations by helping to plan and implement town meetings in eleven major US cities. Members were contacted by ZPG via flyers and phone calls about meetings in their areas. ZPG activists and chapters then provided leadership for many of the meetings which drew thousands of participants and were widely praised by national leaders. Throughout 1994, ZPG's 21 chapters provided members with a vehicle for collective action and a source of information about the population conference, population growth, and wasteful consumption. Chapter activists also helped secure the signatures of thousands of people on Population Priority Petitions; the final list of names was delivered to US Vice President Al Gore in November. PMID:12289955

  9. Putting Action in Perspective

    ERIC Educational Resources Information Center

    Lozano, Sandra C.; Hard, Bridgette Martin; Tversky, Barbara

    2007-01-01

    Embodied approaches to cognition propose that our own actions influence our understanding of the world. Do other people's actions also have this influence? The present studies show that perceiving another person's actions changes the way people think about objects in a scene. In Study 1, participants viewed a photograph and answered a question…

  10. Conservation Action Handbook.

    ERIC Educational Resources Information Center

    National Rifle Association, Washington, DC.

    Conservation problems are identified, with some suggestions for action. General areas covered are: Wildlife Conservation, Soil Conservation, Clean Water, Air Pollution Action, and Outdoor Recreation Action. Appendices list private organizations or agencies concerned with natural resource use and/or management, congressional committees considering…

  11. Action in Development

    ERIC Educational Resources Information Center

    von Hofsten, Claes

    2007-01-01

    It is argued that cognitive development has to be understood in the functional perspective provided by actions. Actions reflect all aspects of cognitive development including the motives of the child, the problems to be solved, and the constraints and possibilities of the child's body and sensorimotor system. Actions are directed into the future…

  12. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  13. Participatory Action Research.

    ERIC Educational Resources Information Center

    Walker, Martha Lentz

    1993-01-01

    Describes aspects of participatory action research and considers advantages of using participatory action research in research by disabilities and rehabilitation researchers. Notes that participatory action research can be built into any rehabilitation research design but that it rests upon the recognition of persons with disabilities as integral…

  14. Empowering communities: action research through healthy cities.

    PubMed

    Flynn, B C; Ray, D W; Rider, M S

    1994-01-01

    The Healthy Cities process uses action research to empower communities to take action for health. Five concepts that link community empowerment and action research are: focus on community, citizen participation, information and problem solving, sharing of power, and quality of life. Two city examples from Healthy Cities Indiana, a pilot program of CITYNET Healthy Cities, provide illustrations of these concepts. The dynamics of community participation in action research and the successes and barriers to community participation are presented. Outcomes that empowered the community are suggested: the extent to which Healthy City projects are initiated, their progress monitored, continued action in health supported, resources obtained, and policies promoted that contribute equity in health. PMID:8002362

  15. Making Climate Science Actionable (Invited)

    NASA Astrophysics Data System (ADS)

    Lempert, R. J.

    2013-12-01

    Decades of research and experience make clear that scientific information influences decision making most effectively when its presentation and use is explicitly linked to well-crafted decision processes. This talk will describe how climate science information has been made actionable within a process of 'deliberation with analysis,' in which analytic information is used to facilitate an iterative process of decision framing, vulnerability assessment, and tradeoff analysis among decision options. In particular, such processes can manage uncertainty in climate, socio-economic, and other projections by focusing on identifying decisions robust over a wide range of plausible scenarios. This talk will describe how these concepts have been used to enhance adaptation to climate change, focusing on successful examples of stakeholder engagement that address, for example, water and flood risk management. The talk will also suggest how some of these same principles can be used to facilitate actions to reduce greenhouse gas emissions.

  16. Understanding affirmative action.

    PubMed

    Crosby, Faye J; Iyer, Aarti; Sincharoen, Sirinda

    2006-01-01

    Affirmative action is a controversial and often poorly understood policy. It is also a policy that has been widely studied by social scientists. In this review, we outline how affirmative action operates in employment and education settings and consider the major points of controversy. In addition, we detail the contributions of psychologists and other social scientists in helping to demonstrate why affirmative action is needed; how it can have unintended negative consequences; and how affirmative action programs can be most successful. We also review how psychologists have examined variations in people's attitudes toward affirmative action, in part as a means for testing different theories of social behavior. PMID:16318608

  17. Public participation in UMTRA Project program management

    SciTech Connect

    Majors, M.J.; Ulland, L.M.

    1993-12-31

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it`s been shown that an effective public participation program is an essential element to successful project implementation.

  18. 77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY... FTA actions announced herein for the listed public transportation project will be barred unless the... final agency actions by issuing certain approvals for the public transportation project listed...

  19. Demonstration Projects: Implementation and Institutionalization.

    ERIC Educational Resources Information Center

    Bina, James V.; Hull, William L.

    Three purposes are listed for this paper: (1) to share the results of a national survey of vocational education exemplary projects; (2) to emphasize the importance of a project director's communication with five clientele audiences; and (3) to suggest specific actions likely to result in institutionalization of a demonstration project. A brief…

  20. 75 FR 43611 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ...This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the SR 502 Corridor Widening Project, in the State of Washington. Those actions grant approval for the project. The project will widen the existing two-lane roadway to four travel lanes with a median for a 5-mile segment of SR 502 between NE......

  1. 75 FR 75721 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ...This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(1)(1). The actions relate to a proposed highway project, the WIS 23 Corridor Expansion Project, in the State of Wisconsin. Those actions grant approval for the project. The project will widen the existing two-lane roadway to four travel lanes with a median for an 18.6-mile segment of WIS 23 between......

  2. Notice of Distribution of the Outline for Promotion Action of Young Intellectuals Participating in the Poverty Relief Project through Science and Technology by the Central Committee of the Communist Youth League and the State Science Commission (June 11, 1997)

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2008

    2008-01-01

    This policy is the first manifestation of the state's effort to organize youth to volunteer in rural China where the help is most needed. It emphasizes key tasks that can be accomplished by the volunteers in terms of education and training for rural China, especially through science and education. The Promotion Action reflects the mission of the…

  3. Research to Action: an evaluation.

    PubMed

    Murphy, Gail Tomblin; Alder, Rob; MacKenzie, Adrian; Cook, Amanda; Maddalena, Victor

    2012-03-01

    The evaluation of the Research to Action project was conducted using an Outcome Mapping (OM) methodology (Earl et al. 2001) with a mixed-methods, repeat survey (before/after) study design. This design uses concurrent measurement of process and outcome indicators at baseline and follow-up. The RTA project proved effective at improving work environments and thereby promoting the retention and recruitment of nurses. Nurses involved in the RTA initiatives had a higher perception of leadership and support in their units, improved job satisfaction, increased empowerment and occupational commitment, and a greater intention to stay on the job.The pilot projects were most successful when there were clearly stated objectives, buy-in from nurses, support from the steering committee and management, and adequate communication among stakeholders. Committed coordination and leadership, both locally and nationally, were central to success.Considerable evidence has documented the challenges facing Canada's nursing human resources and their workplaces, such as high levels of turnover, excessive use of overtime and persistent shortages. There is a growing imperative to translate this research into action, and much of the available evidence presents viable policy alternatives for consideration. For example, a recent national synthesis report (Maddalena and Crupi 2008) recommended that, in consultation with stakeholders, processes should be put in place to share knowledge and best practices in nursing management, practice, staffing models and innovations in workplace health and well-being.Nurses across the country report a desire to be more involved in decisions affecting them and their patients (Wortsman and Janowitz 2006). A recent study on the shortage of registered nurses in Canada (Tomblin Murphy et al. 2009) highlighted the need for collaboration among governments, employers, unions and other stakeholders to improve working conditions for nurses. Another report notes the

  4. Preparing Palestinian Reflective English Language Teachers through Classroom Based Action Research

    ERIC Educational Resources Information Center

    Dajani, Majida "Mohammed Yousef "

    2015-01-01

    This study aimed to describe the implementation of individual action research projects among some forty English language teachers distributed in thirty Palestinian schools in Ramallah and Qabatya districts-Palestine. It aimed to analyze the outcomes of the teachers' action research as part of a broader participatory action research project that is…

  5. 78 FR 73233 - Actions Taken at September 19, 2013, Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ..., LLC (Sugar Creek), Burlington Township, Bradford County, Pa. Renewal of surface water withdrawal of up... water resources projects; (2) rescinded approvals for three projects; (3) took additional actions, as...). 2. Project Sponsor and Facility: Chevron Appalachia, LLC (Highland Sewer and Water...

  6. China Earthquake Relief: Participatory Action Work with Children

    ERIC Educational Resources Information Center

    Zeng, Emily Jie; Silverstein, Louise Bordeaux

    2011-01-01

    This article presents a community-focused participatory action project designed to promote children's resilience in the early aftermath of the cataclysmic May 2008 Earthquake in Beichuan, China. Thirty children aged 7- to 15-years-old participated in the project. The project encompassed four phases that evolved from adult-directed/initiated…

  7. Ethical Principles in Practice: Evidence from Participatory Action Research

    ERIC Educational Resources Information Center

    Smith, Liz

    2008-01-01

    A significant challenge for all participants in the autism spectrum disorder participatory action research (ASD PAR) project, including the Ministry of Education, the local project teams (LPT) and mentors, was the lack of availability of a single ethics approval process for the project in its entirety and, in particular, one that could accommodate…

  8. Burnet Project

    PubMed Central

    Masellis, A.; Atiyeh, B.

    2009-01-01

    Summary The BurNet project, a pilot project of the Eumedis initiative, has become true. The Eumedis (EUro MEDiterranean Information Society) initiative is part of the MEDA programme of the EU to develop the Information Society in the Mediterranean area. In the health care sector, the objective of Eumedis is: the deployment of network-based solutions to interconnect - using userfriendly and affordable solutions - the actors at all levels of the "health care system" of the Euro-Mediterranean region. The Bur Net project interconnects 17 Burn Centres (BC) in the Mediterranean Area through an information network both to standardize courses of action in the field of prevention, treatment, and functional and psychological rehabilitation of burn patients and to coordinate interactions between BC and emergency rooms in peripheral hospitals using training/information activities and telemedicine to optimize first aid provided to burn patients before referral to a BC. Shared procedure protocols for prevention and the care and rehabilitation of patients, both at individual and mass level, will help to create an international specialized database and a Webbased teleconsultation system. PMID:21991176

  9. Stereoscopically Observing Manipulative Actions

    PubMed Central

    Ferri, S.; Pauwels, K.; Rizzolatti, G.; Orban, G. A.

    2016-01-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors “stimulus type” (action, static control, and dynamic control), “stereopsis” (present, absent) and “viewpoint” (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. PMID:27252350

  10. Stereoscopically Observing Manipulative Actions.

    PubMed

    Ferri, S; Pauwels, K; Rizzolatti, G; Orban, G A

    2016-08-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors "stimulus type" (action, static control, and dynamic control), "stereopsis" (present, absent) and "viewpoint" (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. PMID:27252350

  11. Reducing Teenage Binge Drinking and Drunk Driving on the Reservation: The Pikanii Action Team

    ERIC Educational Resources Information Center

    Still Smoking, Dorothy; Bull Shoe, Debbie Whitegrass

    2012-01-01

    The Pikanii Action Team project addressed the issues of teenage drinking and drunk driving on the Blackfeet Reservation. Basing their actions on locally-generated research, the Pikanii Action Team conducted a series of activities and initiatives to promote public awareness and action related to high-risk activities related to drinking. The team's…

  12. Parental Involvement in the Habilitation Process Following Children's Cochlear Implantation: An Action Theory Perspective

    ERIC Educational Resources Information Center

    Zaidman-Zait, Anat; Young, Richard A.

    2008-01-01

    Action theory and the qualitative action-project method are used in this study to address and illustrate the complexity of parenting children who have received cochlear implants (CIs) as well as the intentionality of parents engaged in that process. "Action" refers to individual and joint goal-directed and intentional behaviors. Action theory has…

  13. Conceptualizing Indicator Domains for Evaluating Action Research

    ERIC Educational Resources Information Center

    Piggot-Irvine, Eileen; Rowe, Wendy; Ferkins, Lesley

    2015-01-01

    The focus of this paper is to share thinking about meta-level evaluation of action research (AR), and to introduce indicator domains for assessing and measuring inputs, outputs and outcomes. Meta-level and multi-site evaluation has been rare in AR beyond project implementation and participant satisfaction. The paper is the first of several…

  14. Service Learning: An Action Oriented Program Evaluation

    ERIC Educational Resources Information Center

    Kelley, George

    2013-01-01

    Service learning is an academic discipline that provides students with "hands-on" opportunities for developing skills in real-world, community-based projects that serve and benefit community members. This dissertation reflects an action-oriented process for improving the quality of the Service Learning Program at City University of…

  15. A Synthesis of Action Research on Coaching

    ERIC Educational Resources Information Center

    Day, Nicole Kristine

    2015-01-01

    This paper reviews data from 27 final reports of action research projects in the area of instructional coaching undertaken as part of Cycle 4 (2008-2010) of the Alberta Initiative for School Improvement (AISI). AISI was an Alberta government programme that provided funding to every school district to allow teachers to create site-based, action…

  16. Building Capacity through Action Research Curricula Reviews

    ERIC Educational Resources Information Center

    Lee, Vanessa; Coombe, Leanne; Robinson, Priscilla

    2015-01-01

    In Australia, graduates of Master of Public Health (MPH) programmes are expected to achieve a set of core competencies, including a subset that is specifically related to Indigenous health. This paper reports on the methods utilised in a project which was designed using action research to strengthen Indigenous public health curricula within MPH…

  17. Empowerment, Ethics, Environmental Action: A Practical Exercise.

    ERIC Educational Resources Information Center

    Haigh, Martin J.

    1996-01-01

    Reviews a teaching exercise that highlights ethical and ecological issues through the systematic critical analysis of a technical land reclamation project. Students are encouraged to examine their own motivation for advocating particular solutions, to consider the value systems implicit in solutions, and to examine environmental actions in…

  18. Unlearning, Critical Action Learning and Wicked Problems

    ERIC Educational Resources Information Center

    Pedler, Mike; Hsu, Shih-wei

    2014-01-01

    This paper explores the idea of unlearning in Critical Action Learning (CAL) as applied to the wicked problems of organisations and societies. It draws on data and ideas developed during a research project conducted for "Skills for Care" by Pedler, Abbott, Brook and Burgoyne ("Skills for Care" 2014) and from experiences on…

  19. Productive Tensions in Youth Participatory Action Research

    ERIC Educational Resources Information Center

    Kirshner, Ben

    2010-01-01

    Youth participatory action research (YPAR) brings young people together with adult researchers to identify, study, and act on relevant social problems. In this chapter, the author draws on examples from a recent YPAR project, called Tracing Transitions, whose aim was to study the impact of school closure on students. After defining YPAR in terms…

  20. 75 FR 19670 - Marine Highway Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Maritime Administration Marine Highway Projects ACTION: Solicitation of applications for Marine highway projects. SUMMARY: The Department of Transportation is soliciting applications for Marine Highway...

  1. National Security Technology Incubator Action Plan

    SciTech Connect

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  2. Action research: what, why and how?

    PubMed

    Vallenga, Dineke; Grypdonck, Mieke H F; Hoogwerf, Lucienne J R; Tan, Francis I Y

    2009-06-01

    Action research is a form of research that enables practitioners to investigate and evaluate their own work. It is increasingly used in health care research; it is a research strategy in which the researcher and practitioners from the setting under study work together in projects aimed at generating new knowledge and simultaneously improving practice. This article gives an overview of the theoretical background of action research, its international historical development and explanations of its varied forms and related practical applications. Ethical problems are discussed as are questions of rigour The article shows that action research can be used to bridge the gap between theory and practice by generating knowledge fitting the particular circumstances in the practical setting, thereby avoiding problems of implementation of research findings due to lack of fit or lack of motivation. Action research lastingly increases the capacities of practitioners to solve problems encountered in practice. PMID:19681439

  3. Action Learning in China

    ERIC Educational Resources Information Center

    Marquardt, Michael J.

    2015-01-01

    Action learning was introduced into China less than 20 years ago, but has rapidly become a valuable tool for organizations seeking to solve problems, develop their leaders, and become learning organizations. This article provides an historical overview of action learning in China, its cultural underpinnings, and five case studies. It concludes…

  4. Who Needs Affirmative Action.

    ERIC Educational Resources Information Center

    Ginger, Ann Fagan

    1979-01-01

    Affirmative action and reverse discrimination are discussed. Facts that were omitted from the court record on the Bakke case are examined. The need for encouraging minority students and women to continue to press for school admission and for lawyers to continue to press affirmative action suits is stressed. (MC)

  5. Affirmative Action in Israel.

    ERIC Educational Resources Information Center

    Lerner, Natan

    This paper examines issues of equality, discrimination, affirmative action, and preferential treatment in Israel. An introduction provides a broad outline of topics addressed in the paper: the status of the Jewish sector, with treatment of Jewish immigrants to serve as an example of affirmative action; the policies of the state in relation to the…

  6. Community-Action Learning

    ERIC Educational Resources Information Center

    Bell, Sarah; Mattern, Mark; Telin, Mike

    2007-01-01

    This paper describes and analyzes an undergraduate course entitled Public Interest Research in which students learn research methods by conducting research on behalf of one or more community organizations. Students' work is conceived of as community action learning, a combination of participatory action research and service learning, emphasizing…

  7. Social Action Art Therapy

    ERIC Educational Resources Information Center

    Golub, Deborah

    2005-01-01

    This paper explores intersections among art, action, and community. It describes sociopolitical aspects of the author's art therapy work with survivors of repressive regimes living in Brazil, China, and Denmark and considers ways that unique historical and social processes influenced her conceptualization and practice of social action art therapy.

  8. Training for Nonviolent Action.

    ERIC Educational Resources Information Center

    Olson, Theodore W.; Shivers, Lynne

    The theory and practice of nonviolent action training as it exists to date are reviewed in this pamphlet. A response to a renewal of interest in alternative forms of social action, the pamphlet results specifically from an international seminar of experienced organizers and trainers held at Preston Patrick, Westmorland, England, June 27 - July 2,…

  9. Renormalized action improvements

    SciTech Connect

    Zachos, C.

    1984-01-01

    Finite lattice spacing artifacts are suppressed on the renormalized actions. The renormalized action trajectories of SU(N) lattice gauge theories are considered from the standpoint of the Migdal-Kadanoff approximation. The minor renormalized trajectories which involve representations invariant under the center are discussed and quantified. 17 references.

  10. Action Research and Policy

    ERIC Educational Resources Information Center

    Foreman-Peck, Lorraine; Murray, Jane

    2008-01-01

    This article examines the relationship between action research and policy and the kind of confidence teachers, policy makers and other potential users may have in such research. Many published teacher action research accounts are criticised on the grounds that they do not fully meet the conventional standards for reporting social scientific…

  11. Affirmative Action Report, 1992.

    ERIC Educational Resources Information Center

    Nevada Univ. and Community Coll. System, Reno. Office of the Chancellor.

    All campuses and units of the University and Community College System of Nevada annually submit data to the Chancellor's Office on affirmative action. This report provides tables of affirmative action data for students enrolled during fall 1992 and professional and classified staff employed during 1992. First, student data is provided on gender…

  12. Action spectrum for photocarcinogenesis.

    PubMed

    de Gruijl, F R

    1995-01-01

    The wavelength dependence of the carcinogenicity of ultraviolet (UV) radiation needs to be known in order to assess the carcinogenic risks of various UV sources, most notably the different solar UV spectra at ground level under depleting stratospheric ozone. This wavelength dependence cannot be extracted from human data (e.g., from epidemiology); it can, however, be directly obtained from animal experiments. Precise information on the wavelength dependence, the so-called action spectrum, was not available until recently: erythemal or mutagenic action spectra have been used as substitutes. However, experimental data on skin tumors induced in hairless mice (Skh:HR1) with various polychromatic sources have been building up. Our group has found that none of the substitute action spectra yield a statistically acceptable description of our data, and we have, therefore, derived a new action spectrum, dubbed the SCUP action spectrum (SCUP stands for Skin Cancer Utrecht-Philadelphia, because the action spectrum also fits experimental data from the former Skin and Cancer Hospital in Philadelphia). The SCUP action spectrum has a maximum at 293 nm, and in the UVA region above 340 nm the relative carcinogenicity per J/m2 drops to about 10(-4) of this maximum. The effects of an ozone depletion on solar UV doses weighted with these different action spectra are compared: the erythemal and SCUP weighted dose come out as least sensitive with a 1.3% and 1.4% increase, respectively, for every 1% decrease in ozone. PMID:7597292

  13. Handbook for Ecology Action.

    ERIC Educational Resources Information Center

    Eber, Ronald

    This handbook has been compiled to aid concerned individuals and ecology groups more adequately define their goals, initiate good programs, and take effective action. It examines the ways a group of working individuals can become involved in action programs for ecological change. Part 1 deals with organization, preliminary organizing, structuring,…

  14. Conscious Vision in Action.

    PubMed

    Briscoe, Robert; Schwenkler, John

    2015-09-01

    It is natural to assume that the fine-grained and highly accurate spatial information present in visual experience is often used to guide our bodily actions. Yet this assumption has been challenged by proponents of the Two Visual Systems Hypothesis (TVSH), according to which visuomotor programming is the responsibility of a "zombie" processing stream whose sources of bottom-up spatial information are entirely non-conscious (Clark, 2007, 2009; Goodale & Milner, 1992, 2004a; Milner & Goodale, 1995/2006, 2008). In many formulations of TVSH, the role of conscious vision in action is limited to "recognizing objects, selecting targets for action, and determining what kinds of action, broadly speaking, to perform" (Clark, 2007, p. 570). Our aim in this study is to show that the available evidence not only fails to support this dichotomous view but actually reveals a significant role for conscious vision in motor programming, especially for actions that require deliberate attention. PMID:25845648

  15. Literacy in the History Classroom: A Cross Case Analysis of Teacher Implemented Participatory Action Research

    ERIC Educational Resources Information Center

    D'warte, Jacqueline Ann

    2010-01-01

    This qualitative study researches a participatory action research project undertaken by 12 history teachers in two urban school districts. In this project middle and high school teachers were engaged in a yearlong action research project that involved them in implementing literacy strategies within their classrooms and reflecting on the use and…

  16. Following the Action in Action Learning: Towards Ethnomethodological Studies of (Critical) Action Learning

    ERIC Educational Resources Information Center

    Fox, Steve

    2009-01-01

    Action learning is a pedagogical practice that helps participants learn by talking about their workplace action with fellow participants ("comrades in adversity") in their action learning set. This paper raises questions about the action in action learning, such as: how do members of an action learning set learn from and through each other? How do…

  17. Community Adult Education; Evidence Submitted to the Russell Committee on Adult Education in England and Wales by the Workers' Educational Association (West Lancashire & Cheshire District) and the Liverpool Educational Priority Area Action/Research Project.

    ERIC Educational Resources Information Center

    Lovett, T. O.

    This paper discusses six roles which an adult education agency can fill in an Educational Priority Area and illustrates each one with examples from the Liverpool E.P.A. Project. These roles are: (1) adult education cum community development; (2) adult education as a resource in community development work; (3) adult education as an aid to parents…

  18. 49 CFR 228.107 - Action on petition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...). If individual air conditioning and heating systems are to be utilized, projections may relate to... the Railroad Safety Board for action in accordance with the provisions of part 211, title 49,...

  19. Action spectra again?

    PubMed

    Coohill, T P

    1991-11-01

    Action spectroscopy has a long history and is of central importance to photobiological studies. Action spectra were among the first assays to point to chlorophyll as the molecule most responsible for plant growth and to DNA as the genetic material. It is useful to construct action spectra early in the investigation of new areas of photobiological research in an attempt to determine the wavelength limits of the radiation region causing the studied response. But due to the severe absorption of ultraviolet (UV) radiation by biological samples, UV action spectra were first limited to small cells (bacteria and fungi). Advances in techniques (e.g. single cell culture) and analysis allowed accurate action spectra to be reported even for mammalian cells. But precise analytical action spectra are often difficult to obtain when large, pigmented, or groups of cells are investigated. Here some action spectra are limited in interpretation and merely supply a wavelength vs effect curve. When polychromatic sources are employed, the interpretation of action spectra is even more complex and formidable. But such polychromatic action spectra can be more directly related to ambient responses. Since precise action spectra usually require the completion of a relatively large number of careful experiments using somewhat sophisticated equipment over a range of at least six wavelengths, they are often not pursued. But they remain central to the elucidation of the effect being studied. The worldwide community has agreed that stratospheric ozone is depleting, with the possibility of a consequent rise in the amount of UV-B (290-320 nm) reaching the earth's surface. It is therefore essential that new action spectra be completed for UV-B effects on a large variety of responses of human, animal, and aquatic plant systems. Combining these action spectra with the known amounts of UV-B reaching the biosphere can give rise to solar UV effectiveness spectra that, in turn, can give rise to estimates

  20. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... Southwestern Power Administration Sam Rayburn Dam Project Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of proposed extension. SUMMARY: The current Sam Rayburn Dam Project rate was... cost recovery criteria. In accordance with Southwestern's isolated project rate adjustment...

  1. Paradoxes of Social Control: Children's Perspectives and Actions.

    ERIC Educational Resources Information Center

    Chevalier, Marsha

    1998-01-01

    Describes an action research project that explored whether internally negotiated group control was possible among preadolescents in school settings. Presents John Dewey's thoughts on social control. Discusses study of students' perspectives and actions concerning authority issues and social control. Describes a social studies curriculum used to…

  2. Action Learning--A Process Which Supports Organisational Change Initiatives

    ERIC Educational Resources Information Center

    Joyce, Pauline

    2012-01-01

    This paper reflects on how action learning sets (ALSs) were used to support organisational change initiatives. It sets the scene with contextualising the inclusion of change projects in a masters programme. Action learning is understood to be a dynamic process where a team meets regularly to help individual members address issues through a highly…

  3. A Guide to Connected Curriculum and Action Research.

    ERIC Educational Resources Information Center

    Peppard, Judy

    Teachers in the Connecting the Curriculum (CTC) Project utilized action research to study curriculum connections. This guide provides basic information on connected curriculum and action research and explains the processes that underlie them. Chapter 1 introduces connected curriculum, including definitions, frameworks, and multidisciplinary and…

  4. Student Voice in High School: An Action Research Study

    ERIC Educational Resources Information Center

    Termini, Lorraine

    2013-01-01

    This action research study examined the effects of student voice in one high school and the self-reflection of the researcher-administrator involved in the effort. Using three cycles of action research, the researcher-administrator completed a pilot study, implemented a student voice project in one class, and developed a professional development…

  5. Building Civic Bridges: Community-Centered Action Civics

    ERIC Educational Resources Information Center

    LeCompte, Karon; Blevins, Brooke

    2015-01-01

    Project-based learning is an example of powerful social studies learning in which student engage in active inquiry. Action civics is a relatively new educational practice in which students "act as citizens" through a cycle of research, action, and reflection about problems they care about in their community. "Building Civic…

  6. The Reflective Teacher Leader: An Action Research Model

    ERIC Educational Resources Information Center

    Furtado, Leena; Anderson, Dawnette

    2012-01-01

    This study presents four teacher reflections from action research projects ranging from kindergarten to adult school improvements. A teacher leadership matrix guided participants to connect teaching and learning theory to best practices by exploring uncharted territory within an iterative cycle of research and action. Teachers developed the…

  7. 76 FR 41855 - Actions Taken at June 23, 2011, Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at June 23, 2011, Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice... projects, including six involving diversions of water into the Susquehanna River Basin; (3)...

  8. The Construction of Career through Goal-Directed Action

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav

    2004-01-01

    The thesis of this article is that occupational career is constructed through a system of intentional, goal-directed processes in the form of actions and projects as well as other careers, such as the family career and relationship careers. A contextual action theory of career is proposed as an approach that reflects a constructionist stance and…

  9. Reflections on a Collaborative Adult Literacy and Numeracy Action Enquiry

    ERIC Educational Resources Information Center

    McKim, Anne; Wright, Noeline

    2012-01-01

    This paper reports and reflects on a collaborative and multi-layered action enquiry project in the New Zealand polytechnic sector. In the context of widespread national professional development centred on adult literacy and numeracy teaching and learning in vocational educational institutions, an action enquiry methodology was piloted with…

  10. Conscious Control over Action

    PubMed Central

    Shepherd, Joshua

    2015-01-01

    The extensive involvement of nonconscious processes in human behaviour has led some to suggest that consciousness is much less important for the control of action than we might think. In this article I push against this trend, developing an understanding of conscious control that is sensitive to our best models of overt (that is, bodily) action control. Further, I assess the cogency of various zombie challenges—challenges that seek to demote the importance of conscious control for human agency. I argue that though nonconscious contributions to action control are evidently robust, these challenges are overblown. PMID:26113753

  11. Corrective Action Glossary

    SciTech Connect

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations or remediations are also included.

  12. Climate Change Schools Project...

    ERIC Educational Resources Information Center

    McKinzey, Krista

    2010-01-01

    This article features the award-winning Climate Change Schools Project which aims to: (1) help schools to embed climate change throughout the national curriculum; and (2) showcase schools as "beacons" for climate change teaching, learning, and positive action in their local communities. Operating since 2007, the Climate Change Schools Project…

  13. The Legacy Project

    ERIC Educational Resources Information Center

    Moye, Johnny J.

    2012-01-01

    This article is the first in a series of articles entitled "The Legacy Project." It focuses on the lives and actions of leaders who have forged technology engineering education profession into what it is today. Members of the profession owe a debt of gratitude to these leaders. One simple way to demonstrate that gratitude is to recognize them and…

  14. Immunization Action Coalition

    MedlinePlus

    ... IAC | Contact | A-Z Index | Donate | Shop | SUBSCRIBE Immunization Action Coalition Handouts for Patients & Staff A-Z ... Index Supplies Checklist Administering Vaccines Temperature Logs Adult Vaccination Topics of Interest Documenting Vaccination Translations Parent Handouts ...

  15. Delving into Egocentric Actions

    PubMed Central

    Li, Yin; Ye, Zhefan; Rehg, James M.

    2016-01-01

    We address the challenging problem of recognizing the camera wearer's actions from videos captured by an egocentric camera. Egocentric videos encode a rich set of signals regarding the camera wearer, including head movement, hand pose and gaze information. We propose to utilize these mid-level egocentric cues for egocentric action recognition. We present a novel set of egocentric features and show how they can be combined with motion and object features. The result is a compact representation with superior performance. In addition, we provide the first systematic evaluation of motion, object and egocentric cues in egocentric action recognition. Our benchmark leads to several surprising findings. These findings uncover the best practices for egocentric actions, with a significant performance boost over all previous state-of-the-art methods on three publicly available datasets. PMID:26973427

  16. Caregiver Action Network

    MedlinePlus

    ... main content Caregiver Action Network Toggle navigation Toolbox Forum Volunteers Donate About Us Join National Family Caregivers ... for caring for a loved one Family Caregiver Forum Share and talk with other caregivers Rare Disease ...

  17. Postpartum Depression Action Plan

    MedlinePlus

    MENU Return to Web version Postpartum Depression | Postpartum Depression Action Plan Patient __________________________ Physician/NP/PA __________________ Clinic ____________________________ Phone Number ____________________ Choose one area and add other areas as you begin to ...

  18. Affirmative Action's Contradictory Consequences.

    ERIC Educational Resources Information Center

    Heilman, Madeline E.

    1996-01-01

    Addresses affirmative action's success at creating a more equal workplace. Explores some potential psychological costs of this policy--costs that paradoxically may undermine its objectives--and their implications for achieving the goal of workplace equality. (GR)

  19. Commitment to action. Population Action International.

    PubMed

    Squires, S

    1994-01-01

    The national chair of Population Action International (formerly the Population Crisis Committee), Robin Chandler Duke, is a crusader for women's reproductive rights. She was in Bangladesh in 1971 during its civil war. Soldiers would rape young Muslim women, and their families would reject them when they became pregnant. The head of the exiled government agreed to let physicians from IPPF perform abortions on these women, which allowed families to take them back. Opposition to the abortions arose, however. This experience in Bangladesh sparked Ms. Duke's interest in population control. Her years as the wife of a US diplomat granted her access to powerful people worldwide. Her predecessor, retired US Army General Bill Draper, called Ms. Duke from his death bed in 1974 to ask her to be national chair of PAI. She served as a delegate in various international meetings, e.g., the 1980 UNESCO meetings in Belgrade. Spain and Luxembourg honored her for her work of campaigning for women's reproductive rights. She believes that rapid population growth is the most significant problem in the world today. It exacerbates poverty, environmental destruction, and political instability. She believes that universal availability of high quality, voluntary family planning services, including safe abortion, is needed to save humanity from the vicious cycle. Since family planning, sex education, and abortion are the most personal and sensitive parts of people's lives, Population Action frames family planning in the context of basic health care. AIDS complicates the issue, because contraception is no longer limited to birth control. Even though the organization realizes that sexual abstinence is the best way to avoid AIDS, it tries to educate female teenagers not to let boys coerce them to have sex. If they do, have sex Population Action advocates condom use. Ms. Duke cites the family planning successes of Indonesia, Zimbabwe, and Thailand. PMID:12319083

  20. Galileons from Lovelock actions

    SciTech Connect

    Van Acoleyen, Karel; Van Doorsselaere, Jos

    2011-04-15

    We demonstrate how, for an arbitrary number of dimensions, the Galileon actions and their covariant generalizations can be obtained through a standard Kaluza-Klein compactification of higher-dimensional Lovelock gravity. In this setup, the dilaton takes on the role of the Galileon. In addition, such compactifications uncover other more general Galilean actions, producing purely second-order equations in the weak-field limit, now both for the Galileon and the metric perturbations.