Science.gov

Sample records for action remedial alternative

  1. Feasibility study of contamination remediation at Naval Weapons Station, Concord, California. Volume 1. Remedial-action alternatives. Final report

    SciTech Connect

    Cullinane, M.J.; Lee, C.R.; O'Neil, L.J.

    1988-09-01

    This report identifies and describes potential remedial actions to eliminate or mitigate the release of hazardous substances onto lands of the Naval Weapons Station, Concord, CA. Hazardous substances identified as necessitating remedial actions include lead, cadmium, zinc, copper, selenium, and arsenic. The proposed remedial actions are designed to address existing or potential impacts identified in a separate study. These identified impacts include: contamination of soil with metals; contamination and toxicity in plants and soil invertebrates; reduced plant growth; increased soil acidity; surface water contamination; air contamination; loss of quantity and quality of wildlife habitat; loss of wetland function; and loss of ultimate land use. The release of hazardous substances at seven sites was identified in the remedial investigation. The seven individual areas were consolidated into four remedial action subsites (RASS's) based on an analysis of the topography and nature of the habitat.

  2. Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement

    SciTech Connect

    Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

    1983-03-01

    Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

  3. REMEDIAL ACTION COSTING PROCEDURES MANUAL

    EPA Science Inventory

    The manual provides specific procedures for the cost estimating and economic analysis steps required for preparing engineering cost estimates for selecting remedial action alternatives in response to the requirements of the Comprehensive Environmental Response, Compensation, and ...

  4. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    SciTech Connect

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit.

  5. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    SciTech Connect

    Busse, John; Keil, Karen; Staten, Jane; Miller, Neil; Barker, Michelle; MacDonell, Margaret; Peterson, John; Chang, Young-Soo; Durham, Lisa

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS under the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of

  6. Record of decision remedial alternative selection for the Grace Road site (631-22G) operable unit: Final action

    SciTech Connect

    Palmer, E.

    1997-01-01

    This decision document presents the selected remedial action for the Grace Road Site located at the Savannah River Site near Aiken, South Carolina. The selected action was developed in accordance with CERCLA, as amended, and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The selected remedy satisfies both CERCLA and RCRA 3004 requirements. This decision is based on the Administrative Record File for this specific RCRA/CERCLA unit.

  7. Record of Decision Remedial Alternative Selection for the Gunsite 113 Access Road (631-24G) Operable Unit: Final Action

    SciTech Connect

    Palmer, E.

    1997-01-01

    This decision document presents the selected remedial action for the Gunsite 113 Access Road Unit located at the Savannah River Site near Aiken, SC. The selected action was developed in accordance with CERCLA, as amended, and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The selected remedy satisfies both CERCLA and RCRA 3004(U) requirements. This decision is based ont he Administrative Record File for this specific RCRA/CERCLA Unit.

  8. Remedial Action Assessment System

    1997-02-01

    RAAS1.1 is a software-based system designed to assist remediation professionals at each stage of the environmental analysis process. RAAS1.1 provides a template for environmental restoration analysis, and provides the user with key results at each step in the analysis. RAAS1.1 assists the user to develop a coherent and consistent site description, estimate baseline and residual risk to public health from the contaminated site, identify applicable environmental restoration technologies, and formulate feasible remedial response alternatives. Inmore » addition, the RAAS1.1 methodology allows the user to then assess and compare those remedial response alternatives across EPA criteria, including: compliance with objectives; short-term and long-term effectiveness; extent of treatment; and implementability of the technologies. The analytic methodology is segmented and presented in a standardized, concise, easy-to-use format that can be viewed on the personal computer screen, saved and further manipulated, or printed for later use. Each screen and analytic step is accessed via a user-friendly personal computer graphical interface. Intuitively-designed buttons, menus, and lists help the user focus in on the particular information and analysis component of interest; the corresponding results are presented in a format that facilitates their use in decision-making.« less

  9. ICDF Complex Remedial Action Report

    SciTech Connect

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  10. Remedial Action Contacts Directory - 1997

    SciTech Connect

    1997-05-01

    This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

  11. Remedial design/remedial action strategy report

    SciTech Connect

    Dieffenbacher, R.G.

    1994-06-30

    This draft Regulatory Compliance Strategy (RCS) report will aid the ER program in developing and implementing Remedial Design/Remedial Action (RD/RA) projects. The intent of the RCS is to provide guidance for the implementation of project management requirements and to allow the implementation of a flexible, graded approach to design requirements depending on the complexity, magnitude, schedule, risk, and cost for any project. The RCS provides a functional management-level guidance document for the identification, classification, and implementation of the managerial and regulatory aspects of an ER project. The RCS has been written from the perspective of the ER Design Manager and provides guidance for the overall management of design processes and elements. The RCS does not address the project engineering or specification level of detail. Topics such as project initiation, funding, or construction are presented only in the context in which these items are important as sources of information or necessary process elements that relate to the design project phases.

  12. Encapsulation as a passive soil remediation alternative

    SciTech Connect

    Mario, B.R. De

    1996-12-31

    By implementing institutional and engineering controls, a passive, cost-effective, remedial alternative has allowed redevelopment of an abandoned, industrial, site located in Newark, New Jersey. Soil and groundwater contaminants at the site include volatile and semi-volatile organic compounds and metals. The New Jersey Department of Environmental Protection (NJDEP) recognized the impracticality of requiring an aggressive, localized, remedial action to clean up contaminated soil and groundwater in a region that has historically used fill to create land along the state`s waterways. By placing an institutional control, known as a Declaration of Environmental Restriction (DER), on the property, the NJDEP allowed contaminated fill to remain on site and approved encapsulation as the remedial action for the soil. The approved engineering control, encapsulation, consisted of the design and placement of an asphalt pavement cap that covered the affected areas of concern. The asphalt pavement cap prevents direct human contact to contaminated soil and leaching of contaminants in the soil into the groundwater by surface water infiltration. This paper focuses on the subsurface soil investigation and establishment of the DER. The benefits of this remedial alternative are: (1) the urban redevelopment of contaminated land while simultaneously ensuring protection to human health and the environment; (2) costs savings of not having to clean up a regional problem as if it were local; and (3) the facilitation of a property transfer transaction without the risk of future liability for an historical problem.

  13. Nuclear facility decommissioning and site remedial actions

    SciTech Connect

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  14. Remedial action selection using groundwater modeling

    SciTech Connect

    Haddad, B.I.; Parish, G.B.; Hauge, L.

    1996-12-31

    An environmental investigation uncovered petroleum contamination at a gasoline station in southern Wisconsin. The site was located in part of the ancestral Rock River valley in Rock County, Wisconsin where the valley is filled with sands and gravels. Groundwater pump tests were conducted for determination of aquifer properties needed to plan a remediation system; the results were indicative of a very high hydraulic conductivity. The site hydrogeology was modeled using the U.S. Geological Survey`s groundwater model, Modflow. The calibrated model was used to determine the number, pumping rate, and configuration of recovery wells to remediate the site. The most effective configuration was three wells pumping at 303 liters per minute (1/m) (80 gallons per minute (gpm)), producing a total pumping rate of 908 l/m (240 gpm). Treating 908 l/min (240 gpm) or 1,308,240 liters per day (345,600 gallons per day) constituted a significant volume to be treated and discharged. It was estimated that pumping for the two year remediation would cost $375,000 while the air sparging would cost $200,000. The recommended remedial system consisted of eight air sparging wells and four vapor recovery laterals. The Wisconsin Department of Natural Resources (WDNR) approved the remedial action plan in March, 1993. After 11 months of effective operation the concentrations of removed VOCs had decreased by 94 percent and groundwater sampling indicated no detectable concentrations of gasoline contaminants. Groundwater modeling was an effective technique to determine the economic feasibility of a groundwater remedial alternative.

  15. 29 CFR 35.15 - Remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Remedial action. 35.15 Section 35.15 Labor Office of the Secretary of Labor NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL... Remedial action. Even in the absence of a finding of discrimination, a recipient, in administering...

  16. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by...

  17. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by...

  18. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by...

  19. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by...

  20. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by...

  1. 45 CFR 83.3 - Remedial and affirmative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... shall take such remedial action as the Director deems necessary to overcome the effects of such...; Coverage § 83.3 Remedial and affirmative actions. (a) Remedial action. If the Director finds that an...

  2. COST ESTIMATING SYSTEMS FOR REMEDIAL ACTION PROJECTS

    EPA Science Inventory

    This paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary micro-computer based cost estimating systems for hazardous waste remediations. he U.S. EPA system, "Remedial Action Cost Estimating System" (...

  3. Nuclear facility decommissioning and site remedial actions

    SciTech Connect

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  4. 34 CFR 682.609 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... audit or program review, the Secretary follows the procedures described in 34 CFR part 668, subpart H... accordance with 34 CFR part 668, subpart G. (e) A school shall comply with any emergency action, limitation... 34 Education 4 2011-07-01 2011-07-01 false Remedial actions. 682.609 Section 682.609...

  5. 34 CFR 682.609 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... accordance with 34 CFR part 668, subpart G. (e) A school shall comply with any emergency action, limitation... audit or program review, the Secretary follows the procedures described in 34 CFR part 668, subpart H... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 682.609 Section 682.609...

  6. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  7. Volatile organic compound remedial action project

    SciTech Connect

    1991-12-01

    This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

  8. Remedial action planning for Trench 1

    SciTech Connect

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  9. 20 CFR 658.704 - Remedial actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... such a notice is the result of violations of regulations governing services to MSFWs (20 CFR 653.100 et seq.) or the JS complaint system (20 CFR 658.400 et seq.), a copy of said notice shall be sent to the... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Remedial actions. 658.704 Section...

  10. 20 CFR 658.704 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... violations of regulations governing services to MSFWs (20 CFR 653.100 et seq.) or the JS complaint system (20 CFR 658.400 et seq.), a copy of said notice shall be sent to the OWI Administrator, who shall publish... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Remedial actions. 658.704 Section...

  11. 34 CFR 685.308 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary follows the procedures described in 34 CFR part 668, subpart H. (c) The Secretary may impose a... participation in the Direct Loan Program in accordance with 34 CFR part 668, subpart G. (Authority: 20 U.S.C... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 685.308 Section 685.308...

  12. 34 CFR 682.413 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary follows the procedures described in 34 CFR part 668, subpart G, applicable to fine proceedings... Secretary follows the procedures in 34 CFR 30.20-30.32 in collecting a debt by offset against payments... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 682.413 Section 682.413...

  13. 49 CFR 228.333 - Remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.333 Remedial action. A railroad shall, within 24 hours after receiving a good faith notice from a camp...

  14. 49 CFR 228.333 - Remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.333 Remedial action. A railroad shall, within 24 hours after receiving a good faith notice from a camp...

  15. 49 CFR 228.333 - Remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.333 Remedial action. A railroad shall, within 24 hours after receiving a good faith notice from a camp...

  16. 24 CFR 81.46 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial actions. 81.46 Section 81.46 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development THE SECRETARY OF HUD'S REGULATION OF THE FEDERAL NATIONAL MORTGAGE ASSOCIATION (FANNIE MAE) AND THE FEDERAL HOME LOAN MORTGAGE CORPORATION...

  17. 24 CFR 81.46 - Remedial actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Remedial actions. 81.46 Section 81.46 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development THE SECRETARY OF HUD'S REGULATION OF THE FEDERAL NATIONAL MORTGAGE ASSOCIATION (FANNIE MAE) AND THE FEDERAL HOME LOAN MORTGAGE CORPORATION...

  18. REMEDIAL ACTION MANAGEMENT AND COST ANALYSIS

    EPA Science Inventory

    The Comprehensive Environmental Response, Compensation and Liability Act of 1980, specifies statutory requirement for selection of the most 'cost-effective' remedial alternative at Superfund sites. Cost effectiveness, as outlined in section 300.68, subpart F. of the National Cont...

  19. Grand Junction remedial action program. Analysis of currently approved and proposed procedures for establishing eligibility for remedial action. Final report

    SciTech Connect

    1980-12-01

    This analysis of the Grand Junction Remedial Action Program has been undertaken at the request of the Department of Energy (DOE) in response to proposals submitted by the Colorado Department of Health (CHD). In essence those proposals are for approval by DOE of alternative procedures for establishing the eligibility of structures for remedial action. Regardless of the preeminence accorded the RPISU method in the regulation, it is appropriate to question the assumption that this method gives better estimates of average long-term exposure than other potential methods of evaluation. The objectives here are to (1) review the reliability of the methods of measurement authorized by 10 CFR 12, i.e. the RPISU 6 sample method for determining RDC and the presumptive tests based on the indoor net average gamma exposure rate; (2) evaluate the reliability of the alternative measurement methods proposed by the CDH for determining eligibility for remedial action; and (3) recommend for DOE approval specific methods and applicable procedures that may be used to determine eligibility for remedial action with at least the same reliability as presently achieved with the RPISU 6 sample method.

  20. COSTS OF REMEDIAL RESPONSE ACTIONS AT UNCONTROLLED HAZARDOUS WASTE SITES

    EPA Science Inventory

    The primary purpose of this study was to update conceptual design cost estimates for remedial action unit operations portrayed in earlier reports. Thirty-five remedial action unit operations conceptual designs, addressing uncontrolled landfill or impoundment disposal sites, were ...

  1. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has...

  2. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has...

  3. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has...

  4. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has...

  5. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has...

  6. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  7. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  8. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  9. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  10. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  11. 26 CFR 1.147-2 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.147-2 Section 1.147-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.147-2 Remedial actions. The remedial action rules of § 1.142-2 apply to the rules in section 147 for qualified...

  12. 26 CFR 1.142-2 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.142-2 Section 1.142-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.142-2 Remedial actions... this section and the issuer takes the remedial action described in paragraph (c) of this section....

  13. 26 CFR 1.144-2 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.144-2 Section 1.144-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.144-2 Remedial actions. The remedial action rules of § 1.142-2 apply to qualified small issue bonds issued under section...

  14. 15 CFR 20.17 - Remedial action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Conciliation, and Enforcement Procedures § 20.17 Remedial action by recipients. (a) Where DOC finds that a recipient has discriminated on the basis of age, the recipient shall take any remedial action that DOC may... recipient that has discriminated, DOC may require both recipients to take remedial action. (b) Even in...

  15. 15 CFR 20.17 - Remedial action by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., Conciliation, and Enforcement Procedures § 20.17 Remedial action by recipients. (a) Where DOC finds that a recipient has discriminated on the basis of age, the recipient shall take any remedial action that DOC may... recipient that has discriminated, DOC may require both recipients to take remedial action. (b) Even in...

  16. 15 CFR 20.17 - Remedial action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., Conciliation, and Enforcement Procedures § 20.17 Remedial action by recipients. (a) Where DOC finds that a recipient has discriminated on the basis of age, the recipient shall take any remedial action that DOC may... recipient that has discriminated, DOC may require both recipients to take remedial action. (b) Even in...

  17. 15 CFR 20.17 - Remedial action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., Conciliation, and Enforcement Procedures § 20.17 Remedial action by recipients. (a) Where DOC finds that a recipient has discriminated on the basis of age, the recipient shall take any remedial action that DOC may... recipient that has discriminated, DOC may require both recipients to take remedial action. (b) Even in...

  18. 15 CFR 20.17 - Remedial action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., Conciliation, and Enforcement Procedures § 20.17 Remedial action by recipients. (a) Where DOC finds that a recipient has discriminated on the basis of age, the recipient shall take any remedial action that DOC may... recipient that has discriminated, DOC may require both recipients to take remedial action. (b) Even in...

  19. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  20. 45 CFR 84.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial action, voluntary action, and self... Provisions § 84.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... exercises control over the recipient that has discriminated, the Director, where appropriate, may...

  1. 22 CFR 217.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial action, voluntary action, and self... Provisions § 217.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... another recipient exercises control over the recipient that has discriminated, the Administrator,...

  2. 22 CFR 142.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial action, voluntary action, and self... § 142.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... where another recipient exercises control over the recipient that has discriminated, the...

  3. 7 CFR 15b.8 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Remedial action, voluntary action, and self-evaluation....8 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the Secretary... recipient exercises control over the recipient that has discriminated, the Secretary, where appropriate,...

  4. 7 CFR 15b.8 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Remedial action, voluntary action, and self-evaluation....8 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the Secretary... recipient exercises control over the recipient that has discriminated, the Secretary, where appropriate,...

  5. 22 CFR 217.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Remedial action, voluntary action, and self... Provisions § 217.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... another recipient exercises control over the recipient that has discriminated, the Administrator,...

  6. 22 CFR 217.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Remedial action, voluntary action, and self... Provisions § 217.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... another recipient exercises control over the recipient that has discriminated, the Administrator,...

  7. 45 CFR 84.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Remedial action, voluntary action, and self... Provisions § 84.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... exercises control over the recipient that has discriminated, the Director, where appropriate, may...

  8. 22 CFR 217.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Remedial action, voluntary action, and self... Provisions § 217.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... another recipient exercises control over the recipient that has discriminated, the Administrator,...

  9. 7 CFR 15b.8 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Remedial action, voluntary action, and self-evaluation....8 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the Secretary... recipient exercises control over the recipient that has discriminated, the Secretary, where appropriate,...

  10. 22 CFR 142.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Remedial action, voluntary action, and self... § 142.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... where another recipient exercises control over the recipient that has discriminated, the...

  11. 22 CFR 142.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Remedial action, voluntary action, and self... § 142.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... where another recipient exercises control over the recipient that has discriminated, the...

  12. 7 CFR 15b.8 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Remedial action, voluntary action, and self-evaluation....8 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the Secretary... recipient exercises control over the recipient that has discriminated, the Secretary, where appropriate,...

  13. 43 CFR 17.205 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Remedial action, voluntary action, and self... Handicap § 17.205 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... recipient exercises control over the recipient that has discriminated, the Director, where appropriate,...

  14. 45 CFR 84.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial action, voluntary action, and self... Provisions § 84.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... exercises control over the recipient that has discriminated, the Director, where appropriate, may...

  15. 7 CFR 15b.8 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Remedial action, voluntary action, and self-evaluation....8 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the Secretary... recipient exercises control over the recipient that has discriminated, the Secretary, where appropriate,...

  16. 45 CFR 84.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Remedial action, voluntary action, and self... Provisions § 84.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... exercises control over the recipient that has discriminated, the Director, where appropriate, may...

  17. 22 CFR 142.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Remedial action, voluntary action, and self... § 142.6 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... where another recipient exercises control over the recipient that has discriminated, the...

  18. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    SciTech Connect

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.

  19. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  20. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  1. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Remedial and affirmative action. 42.724... affirmative action. (a) If the Department finds that, in violation of this subpart, a recipient has discriminated on the basis of age, the recipient shall take remedial action that the Department...

  2. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false Remedial and affirmative action. 42.724... affirmative action. (a) If the Department finds that, in violation of this subpart, a recipient has discriminated on the basis of age, the recipient shall take remedial action that the Department...

  3. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Remedial and affirmative action. 42.724... affirmative action. (a) If the Department finds that, in violation of this subpart, a recipient has discriminated on the basis of age, the recipient shall take remedial action that the Department...

  4. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false Remedial and affirmative action. 42.724... affirmative action. (a) If the Department finds that, in violation of this subpart, a recipient has discriminated on the basis of age, the recipient shall take remedial action that the Department...

  5. Remedial action suitability for the Cornhusker Army Ammunition Plant site

    SciTech Connect

    Nonavinakere, S.; Rappa, P. III

    1995-12-31

    Numerous Department of Defense (DOD) sites across the nation are contaminated with explosive wastes due to munitions production during World War II, Korean Conflict and Vietnam Conflict. Production activities included explosives manufacturing, loading, packing, assembling, machining, casting and curing. Contaminants often present at these sites include TNT, RDX, HMX, Tetryl 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-TNB and nitrobenzene. The Cornhusker Army Ammunition Plant (CAAP) is one such DOD site that has been determined to be contaminated with explosives. The CAAP is located approximately 2 miles west of the City of Grand Island in Hall County, Nebraska. The plant produced artillery, bombs, boosters, supplementary charges and various other experimental explosives. The purpose of this paper is to provide an overview of the site background, review of the remedial alternatives evaluation process and rationale behind the selection of present remedial action.

  6. Uranium Mill Tailings Remedial Action 1993 Roadmap

    SciTech Connect

    Not Available

    1993-10-18

    The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ``Lack of sufficient human resources,`` remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0.

  7. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Remedial action, voluntary action, and self... action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the Chairman finds that a... basis of handicap in violation of section 504 or this part and where another recipient exercises...

  8. Alternating current electrocoagulation for superfund site remediation

    SciTech Connect

    Barkley, N.P.; Farrell, C.W.; Gardner-Clayson, T.W.

    1993-01-01

    The technical and economical feasibility of alternating current electrocoagulation (ACE) was evaluated for a 2-year period. ACE is an electrochemical technology where highly-charged aluminum polyhydroxide species are introduced into aqueous media for the removal of suspended solids, oil droplets, and soluble ionic pollutants. ACE can break stable aqueous colloidal suspensions of up to 10% total solids and stable emulsions containing up to 5% oil. Major operating parameters have been defined for different classes of effluents based on experimental results using complex synthetic soil slurries and metals. Test results indicate that ACE produces aqueous and solid separations comparable to those produced by chemical flocculent additions, but with reduced filtration times and sludge volumes. The technology has application where removal of soluble and suspended pollutants from effluents is required, and in the recovery of fine-grained products from process streams. The technology however, has not yet been demonstrated at full-scale for Superfund site remediation. Summarized are the principal results of the SITE research program and results of ACE treatment on some different classes of industrial effluents, not part of the SITE Program.

  9. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN HOMESTEADING § 590.31 Corrective and remedial action....

  10. 11 CFR 7.6 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Disciplinary and other remedial action. 7.6 Section 7.6 Federal Elections FEDERAL ELECTION COMMISSION STANDARDS OF CONDUCT General Provisions § 7.6 Disciplinary and other remedial action. (a) A violation of this part by an employee or special...

  11. 16 CFR 1115.20 - Voluntary remedial actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Rules of Practice for Adjudicative Proceedings (16 CFR part 1025). The Consenting Party shall thereafter... 1115.20 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SUBSTANTIAL PRODUCT HAZARD REPORTS Remedial Actions and Sanctions § 1115.20 Voluntary remedial actions....

  12. 16 CFR 1115.20 - Voluntary remedial actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Rules of Practice for Adjudicative Proceedings (16 CFR part 1025). The Consenting Party shall thereafter... 1115.20 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SUBSTANTIAL PRODUCT HAZARD REPORTS Remedial Actions and Sanctions § 1115.20 Voluntary remedial actions....

  13. 16 CFR 1115.20 - Voluntary remedial actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Rules of Practice for Adjudicative Proceedings (16 CFR part 1025). The Consenting Party shall thereafter... 1115.20 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SUBSTANTIAL PRODUCT HAZARD REPORTS Remedial Actions and Sanctions § 1115.20 Voluntary remedial actions....

  14. 16 CFR 1115.20 - Voluntary remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Rules of Practice for Adjudicative Proceedings (16 CFR part 1025). The Consenting Party shall thereafter... 1115.20 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS SUBSTANTIAL PRODUCT HAZARD REPORTS Remedial Actions and Sanctions § 1115.20 Voluntary remedial actions....

  15. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  16. 43 CFR 17.337 - Remedial action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Investigation, Conciliation, and Enforcement Procedures § 17.337 Remedial action by recipients. Where DOI finds... DOI may require to overcome the effects of the discrimination. If another recipient exercises control over the recipient that has discriminated, DOI may require both recipients to take remedial action....

  17. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN HOMESTEADING § 590.31 Corrective and remedial action....

  18. Remedial-Action Costing procedures manual. Final report, January 1985-September 1986

    SciTech Connect

    Burgher, B.; Culpepper, M.; Zieger, W.

    1987-10-01

    This manual provides specific procedures for the cost estimating and economic analysis steps required for preparing engineering cost estimates for selecting remedial-action alternatives in response to the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Contingency Plan (40 CFR 300). The manual is designed to be used in conjunction with EPA's manual entitled Guidance on Feasibility Studies Under CERCLA (1985). The audience for the manual includes EPA Regional Project Officers, remedial investigation/feasibility study contractors, and state and local remedial action personnel and other Federal agencies. Detailed procedures are provided for generating estimated capital and annual operating costs, calculating annual costs and present worth for each remedial-action alternative, and performing sensitivity analyses of the cost estimates to determine the impact of changes to various cost input parameters. Worksheets are provided to assist the user in developing the feasibility cost analyses. An example cost analysis is provided to illustrate these procedures.

  19. Case study of an approved corrective action integrating active remediation with intrinsic remediation

    SciTech Connect

    Teets, D.B.; Guest, P.R.; Blicker, B.R.

    1996-12-01

    Parsons Engineering Science, Inc., performed UST removals and/or site assessments at UST system locations at a former US Air Force Base (AFB) in Denver, Colorado. Four UST systems, incorporating 17 USTs, were located within the petroleum, oils, and lubricants bulk storage yard (POL Yard) of the former AFB. During the tank removals and subsequent site investigations, petroleum hydrocarbon contamination was found in soils at each site. Significant releases from two of the UST systems resulted in a dissolved benzene, toluene, ethylbenzene, and xylenes (BTEX) plume in the groundwater, and smear-zone contamination of soils beneath the majority of the POL Yard. Because of the close proximity of the UST systems, and the presence of the groundwater plume beneath the POL Yard, a corrective action plan (CAP) was prepared that encompassed all four UST systems. An innovative, risk-based CAP integrated active remediation of petroleum-contaminated soils with intrinsic remediation of groundwater. A natural attenuation evaluation for the dissolved BTEX was performed to demonstrate that natural attenuation processes are providing adequate remediation of groundwater and to predict the fate of the groundwater plume. BTEX concentrations versus distance were regressed to obtain attenuation rates, which were then used to calculate BTEX degradation rates using a one-dimensional, steady-state analytical solution. Additionally, electron acceptor concentrations in groundwater were compared to BTEX concentrations to provide evidence that natural attenuation of BTEX compounds was occurring. The natural attenuation evaluation was used in the CAP to support the intrinsic remediation with long-term monitoring alternative for groundwater, thereby avoiding the installation of an expensive groundwater remediation system.

  20. 34 CFR 104.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Remedial action, voluntary action, and self-evaluation... action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a recipient... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  1. 29 CFR 32.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Remedial action, voluntary action, and self-evaluation. 32.6..., voluntary action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  2. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Remedial action, voluntary action, and self... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... violation of section 504 or this part and where another recipient exercises control over the recipient...

  3. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Remedial action, voluntary action, and self... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... violation of section 504 or this part and where another recipient exercises control over the recipient...

  4. 45 CFR 1232.7 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Remedial action, voluntary action and self... action and self-evaluation. (a) Remedial action. (1) If the Director finds that a recipient has... violation of section 504 or this part and where another recipient exercises control over the recipient...

  5. 34 CFR 104.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false Remedial action, voluntary action, and self-evaluation... action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a recipient... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  6. 29 CFR 32.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Remedial action, voluntary action, and self-evaluation. 32..., voluntary action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  7. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Remedial action, voluntary action, and self... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... violation of section 504 or this part and where another recipient exercises control over the recipient...

  8. 29 CFR 32.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Remedial action, voluntary action, and self-evaluation. 32..., voluntary action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  9. 45 CFR 1232.7 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Remedial action, voluntary action and self... action and self-evaluation. (a) Remedial action. (1) If the Director finds that a recipient has... violation of section 504 or this part and where another recipient exercises control over the recipient...

  10. 45 CFR 1232.7 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Remedial action, voluntary action and self... action and self-evaluation. (a) Remedial action. (1) If the Director finds that a recipient has... violation of section 504 or this part and where another recipient exercises control over the recipient...

  11. 29 CFR 32.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Remedial action, voluntary action, and self-evaluation. 32.6 Section 32.6 Labor Office of the Secretary of Labor NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General Provisions § 32.6 Remedial action, voluntary action, and self-evaluation....

  12. 34 CFR 104.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Remedial action, voluntary action, and self-evaluation... action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a recipient... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  13. 45 CFR 1232.7 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Remedial action, voluntary action and self... action and self-evaluation. (a) Remedial action. (1) If the Director finds that a recipient has... violation of section 504 or this part and where another recipient exercises control over the recipient...

  14. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Remedial action, voluntary action, and self... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... violation of section 504 or this part and where another recipient exercises control over the recipient...

  15. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Remedial action, voluntary action, and self... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... violation of section 504 or this part and where another recipient exercises control over the recipient...

  16. 29 CFR 32.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Remedial action, voluntary action, and self-evaluation. 32.6..., voluntary action, and self-evaluation. (a) Remedial action. (1) If the Assistant Secretary finds that a... exercises control over the recipient that has discriminated, the Assistant Secretary, where appropriate,...

  17. Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

    SciTech Connect

    Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

    1995-05-01

    The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

  18. Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

    SciTech Connect

    Barber, Brenda; Honerlah, Hans; O'Neill, Mike; Young, Carl

    2012-07-01

    Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include

  19. Environmental Restoration Remedial Action Quality Assurance Requirements Document

    SciTech Connect

    Cote, R.F.

    1991-09-01

    The Environmental Restoration Remedial Action Quality Assurance Requirements Document defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. 18 refs.

  20. Alternative Endpoints and Approaches Selected for the Remediation of Contaminated Groundwater at Complex Sites

    NASA Astrophysics Data System (ADS)

    Deeb, R. A.; Hawley, E.

    2011-12-01

    This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and alternative remedial strategies for groundwater remediation under a variety of Federal and state cleanup programs, including technical impracticability (TI) and other Applicable or Relevant and Appropriate Requirement (ARAR) waivers, state and local designations such as groundwater management zones, Alternate Concentration Limits (ACLs), use of monitored natural attenuation (MNA) over long timeframes, and more. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies to illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, timeframe, and potential remedial effectiveness. Case studies provide examples of the flexible, site-specific, application of alternative endpoints and alternative remedial strategies that have been used in the past to manage and remediate groundwater contamination at complex sites. For example, at least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. These designations typically indicate that groundwater contamination is present above permissible levels. Soil and groundwater within these zones are managed to protect human health and the environment. Lesson learned for the analyses

  1. 12 CFR 24.7 - Examination, records, and remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false Examination, records, and remedial action. 24.7 Section 24.7 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY COMMUNITY AND ECONOMIC DEVELOPMENT ENTITIES, COMMUNITY DEVELOPMENT PROJECTS, AND OTHER PUBLIC WELFARE INVESTMENTS § 24.7 Examination, records, and remedial...

  2. 12 CFR 24.7 - Examination, records, and remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false Examination, records, and remedial action. 24.7 Section 24.7 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY COMMUNITY AND ECONOMIC DEVELOPMENT ENTITIES, COMMUNITY DEVELOPMENT PROJECTS, AND OTHER PUBLIC WELFARE INVESTMENTS § 24.7 Examination, records, and remedial...

  3. 43 CFR 17.205 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... self-evaluation. 17.205 Section 17.205 Public Lands: Interior Office of the Secretary of the Interior... Handicap § 17.205 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... recipient exercises control over the recipient that has discriminated, the Director, where appropriate,...

  4. 22 CFR 142.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Remedial action, voluntary action, and self-evaluation. 142.6 Section 142.6 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General Provisions § 142.6 Remedial action, voluntary...

  5. 43 CFR 17.205 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... self-evaluation. 17.205 Section 17.205 Public Lands: Interior Office of the Secretary of the Interior... Handicap § 17.205 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... recipient exercises control over the recipient that has discriminated, the Director, where appropriate,...

  6. 43 CFR 17.205 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... self-evaluation. 17.205 Section 17.205 Public Lands: Interior Office of the Secretary of the Interior... Handicap § 17.205 Remedial action, voluntary action, and self-evaluation. (a) Remedial action. (1) If the... recipient exercises control over the recipient that has discriminated, the Director, where appropriate,...

  7. 22 CFR 217.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Remedial action, voluntary action, and self-evaluation. 217.6 Section 217.6 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General Provisions § 217.6 Remedial action,...

  8. Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties

    SciTech Connect

    Not Available

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

  9. 45 CFR 77.5 - Remedial action procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TO LETTER OF CREDIT ADMINISTRATION § 77.5 Remedial action procedures. Except as provided in § 77.6... obligations related to its letter of credit and does not determine the organization's ultimate liability...

  10. Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action

    SciTech Connect

    1994-09-01

    The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

  11. Remediation alternatives for low-level herbicide contaminated groundwater

    SciTech Connect

    Conger, R.M.

    1995-10-01

    In early 1995, an evaluation of alternatives for remediation of a shallow groundwater plume containing low-levels of an organic herbicide was conducted at BASF Corporation, a petrochemical facility located in Ascension Parish, Louisiana. The contaminated site is located on an undeveloped portion of property within 1/4 mile of the east bank of the Mississippi River near the community of Geismar. Environmental assessment data indicated that about two acres of the thirty acre site had been contaminated from past waste management practices with the herbicide bentazon. Shallow soils and groundwater between 5 to 15 feet in depth were affected. Maximum concentrations of bentazon in groundwater were less than seven parts per million. To identify potentially feasible remediation alternatives, the environmental assessment data, available research, and cost effectiveness were reviewed. After consideration of a preliminary list of alternatives, only two potentially feasible alternatives could be identified. Groundwater pumping, the most commonly used remediation alternative, followed by carbon adsorption treatment was identified as was a new innovative alternative known as vegetative transpiration. This alternative relies on the natural transpiration processes of vegetation to bioremediate organic contaminants. Advantages identified during screening suggest that the transpiration method could be the best remediation alternative to address both economic and environmental factors. An experiment to test critical factors of the vegetatived transpiration alternative with bentazon was recommended before a final decision on feasibility can be made.

  12. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Remedial design/remedial action, operation and maintenance. 300.435 Section 300.435 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY...

  13. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... protection of human health and the environment, the operation of such treatment or other measures for a..., operation and maintenance. 300.435 Section 300.435 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., operation and maintenance. (a) General. The remedial design/remedial action (RD/RA) stage includes...

  14. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... protection of human health and the environment, the operation of such treatment or other measures for a..., operation and maintenance. 300.435 Section 300.435 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., operation and maintenance. (a) General. The remedial design/remedial action (RD/RA) stage includes...

  15. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... protection of human health and the environment, the operation of such treatment or other measures for a..., operation and maintenance. 300.435 Section 300.435 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., operation and maintenance. (a) General. The remedial design/remedial action (RD/RA) stage includes...

  16. Lust remediation technologies. Part 2. Soil corrective action descriptions

    SciTech Connect

    Not Available

    1993-08-01

    Leaking underground storage tanks (LUSTs) have been recognized as a major potential source of ground water contamination in the U.S. Current state and federal regulations require the remediation of sites where the soil and/or ground water has been contaminated by leaking underground storage tanks. The document presents information on technologies for the remediation of contaminated soils at LUST sites. A companion volume, LUST Remediation Technologies: Part III - Ground Water Corrective Action Descriptions, presents information on technologies for the remediation of contaminated ground water at LUST sites.

  17. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  18. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    SciTech Connect

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

  19. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect

    Bachrach, A.; Hoopes, J.; Morycz, D. ); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. , Inc., Washington, DC ); Rice, G. )

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  20. 43 CFR 17.205 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Remedial action, voluntary action, and self-evaluation. 17.205 Section 17.205 Public Lands: Interior Office of the Secretary of the Interior NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OF THE DEPARTMENT OF THE INTERIOR Nondiscrimination on the Basis of Handicap § 17.205 Remedial...

  1. ALTERNATING CURRENT ELECTROCOAGULATION FOR SUPERFUND SITE REMEDIATION

    EPA Science Inventory

    The technical and economical feasibility of alternating current electrocoagulation (ACE) developed by Electro-Pure Systems, Inc., was evaluated for a 2-year period. CE is an electrochemical technology where highly-charged aluminum polyhydroxide species are introduced into aqueous...

  2. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    SciTech Connect

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  3. Environmental assessment of remedial action at the Tuba City uranium mill tailings site, Tuba City, Arizona

    SciTech Connect

    1986-11-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Tuba City uranium mill tailings site located approximately six miles east of Tuba City, Arizona. The site covers 105 acres and contains 25 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR Part 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at a more remote location. The no action alternative is also assessed in this document.

  4. DESCRIPTION OF MODELING ANALYSES IN SUPPORT OF THE 200-ZP-1 REMEDIAL DESIGN/REMEDIAL ACTION

    SciTech Connect

    VONGARGEN BH

    2009-11-03

    The Feasibility Study/or the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-28) and the Proposed Plan/or Remediation of the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-33) describe the use of groundwater pump-and-treat technology for the 200-ZP-1 Groundwater Operable Unit (OU) as part of an expanded groundwater remedy. During fiscal year 2008 (FY08), a groundwater flow and contaminant transport (flow and transport) model was developed to support remedy design decisions at the 200-ZP-1 OU. This model was developed because the size and influence of the proposed 200-ZP-1 groundwater pump-and-treat remedy will have a larger areal extent than the current interim remedy, and modeling is required to provide estimates of influent concentrations and contaminant mass removal rates to support the design of the aboveground treatment train. The 200 West Area Pre-Conceptual Design/or Final Extraction/Injection Well Network: Modeling Analyses (DOE/RL-2008-56) documents the development of the first version of the MODFLOW/MT3DMS model of the Hanford Site's Central Plateau, as well as the initial application of that model to simulate a potential well field for the 200-ZP-1 remedy (considering only the contaminants carbon tetrachloride and technetium-99). This document focuses on the use of the flow and transport model to identify suitable extraction and injection well locations as part of the 200 West Area 200-ZP-1 Pump-and-Treat Remedial Design/Remedial Action Work Plan (DOEIRL-2008-78). Currently, the model has been developed to the extent necessary to provide approximate results and to lay a foundation for the design basis concentrations that are required in support of the remedial design/remediation action (RD/RA) work plan. The discussion in this document includes the following: (1) Assignment of flow and transport parameters for the model; (2) Definition of initial conditions for the transport model for each simulated contaminant of concern (COC) (i.e., carbon

  5. 45 CFR 617.14 - Remedial action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Remedial action by recipients. 617.14 Section 617.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM...

  6. 45 CFR 617.14 - Remedial action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Remedial action by recipients. 617.14 Section 617.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM...

  7. 45 CFR 617.14 - Remedial action by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Remedial action by recipients. 617.14 Section 617.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM...

  8. 45 CFR 617.14 - Remedial action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Remedial action by recipients. 617.14 Section 617.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM...

  9. 45 CFR 617.14 - Remedial action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Remedial action by recipients. 617.14 Section 617.14 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM...

  10. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false Remedial and affirmative action. 42.724 Section 42.724 Judicial Administration DEPARTMENT OF JUSTICE NONDISCRIMINATION; EQUAL EMPLOYMENT OPPORTUNITY; POLICIES AND PROCEDURES Nondiscrimination on the Basis of Age in Federally Assisted Programs or Activities; Implementation of the...

  11. 24 CFR 1003.701 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Corrective and remedial action. 1003.701 Section 1003.701 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY...

  12. 24 CFR 1003.701 - Corrective and remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Corrective and remedial action. 1003.701 Section 1003.701 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY...

  13. Description of the Formerly Utilized Sites Remedial Action Program

    SciTech Connect

    Not Available

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  14. 24 CFR 511.82 - Corrective and remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... URBAN DEVELOPMENT SLUM CLEARANCE AND URBAN RENEWAL RENTAL REHABILITATON GRANT PROGRAM Grantee... this part, HUD will follow the procedures described in the Federal Claims Collection Standards (4 CFR... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial actions....

  15. 24 CFR 511.82 - Corrective and remedial actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... URBAN DEVELOPMENT SLUM CLEARANCE AND URBAN RENEWAL RENTAL REHABILITATION GRANT PROGRAM Grantee... this part, HUD will follow the procedures described in the Federal Claims Collection Standards (4 CFR... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Corrective and remedial actions....

  16. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  17. 12 CFR 336.8 - Sanctions and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Corporation § 336.8 Sanctions and remedial actions. (a) Any employee found not in compliance with the minimum... authorized for sanctions for noncompliance. (b) Any employee found not in compliance with the minimum... behalf of the FDIC in any capacity, unless the employee brings him or herself into compliance with...

  18. 29 CFR 34.44 - Corrective and remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Corrective and remedial action. 34.44 Section 34.44 Labor Office of the Secretary of Labor IMPLEMENTATION OF THE NONDISCRIMINATION AND EQUAL OPPORTUNITY REQUIREMENTS OF THE JOB TRAINING PARTNERSHIP ACT OF 1982, AS AMENDED (JTPA) Compliance Procedures §...

  19. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING...

  20. 24 CFR 570.910 - Corrective and remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... eligible activities (pursuant to the citizen participation requirements in 24 CFR part 91); or (iv) Other... subpart B of 24 CFR part 17; and (8) In the case of an entitlement or Insular Areas recipient, condition... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial actions....

  1. 24 CFR 92.551 - Corrective and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Corrective and remedial actions. 92.551 Section 92.551 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM Performance Reviews and Sanctions §...

  2. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... section 504 or this part and where another recipient exercises control over the recipient that...

  3. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... section 504 or this part and where another recipient exercises control over the recipient that...

  4. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... section 504 or this part and where another recipient exercises control over the recipient that...

  5. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... section 504 or this part and where another recipient exercises control over the recipient that...

  6. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  7. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... Introduction § 41.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  8. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  9. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  10. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  11. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  12. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  13. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  14. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Remedial and affirmative action and self... Introduction § 54.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  15. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  16. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  17. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  18. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Remedial and affirmative action and self... Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  19. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Remedial and affirmative action and self... Introduction § 54.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  20. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Remedial and affirmative action and self... Introduction § 1253.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  1. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  2. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  3. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  4. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... Introduction § 86.3 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the Director... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  5. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  6. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Remedial and affirmative action and self... Introduction § 1253.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  7. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self... Introduction § 54.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  8. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  9. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  10. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  11. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Remedial and affirmative action and self... Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  12. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Remedial and affirmative action and self... Introduction § 86.3 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the Director... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  13. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Remedial and affirmative action and self... Introduction § 17.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  14. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  15. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self... Introduction § 86.3 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the Director... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  16. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Remedial and affirmative action and self... Introduction § 41.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  17. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  18. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  19. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  20. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Remedial and affirmative action and self... Introduction § 86.3 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the Director... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  1. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  2. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  3. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Remedial and affirmative action and self... Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  4. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Remedial and affirmative action and self... Introduction § 1253.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  5. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  6. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Remedial and affirmative action and self... Introduction § 54.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  7. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Remedial and affirmative action and self... Introduction § 17.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  8. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  9. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In...

  10. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan

    SciTech Connect

    D. E. Shanklin

    2006-06-01

    This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

  11. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    SciTech Connect

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  12. SEDIMENT ASSESSMENT AND REMEDIATION PROGRAM

    EPA Science Inventory

    Assessment and Remediation of Contaminated Sediments (ARCS) is an integrated program for the development and testing of assessment and remedial action alternatives for contaminated sediments. Information from ARCS program activities will be used to guide the development of Remedi...

  13. Cost-estimating systems for remedial-action projects

    SciTech Connect

    Evans, G.M.; Peterson, J.

    1991-01-01

    The paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary microcomputer based cost estimating systems for hazardous waste remediations. The U.S. EPA system, Remedial Action Cost Estimating System (RACES), is a technology based application. Estimates generated by RACES are based upon cost engineering relationships. The estimates are designed for use in the early stages of remediation design. The U.S. Army Corps of Engineers system, Micro-Computer Aided Cost Engineering System (M-CACES), is a bottoms-up system for use in situations where detailed design information is available. While both systems will stand alone, they have been designed to allow the transfer of estimates generated by RACES directly into the M-CACES system.

  14. 43 CFR 20.603 - Appealing an order for remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Appealing an order for remedial action. 20.603 Section 20.603 Public Lands: Interior Office of the Secretary of the Interior EMPLOYEE RESPONSIBILITIES AND CONDUCT Disciplinary and Remedial Actions § 20.603 Appealing an order for remedial action. (a) When and how to appeal. An employee...

  15. 31 CFR 28.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Remedial and affirmative action and... FINANCIAL ASSISTANCE Introduction § 28.110 Remedial and affirmative action and self-evaluation. (a) Remedial... activity, a recipient may take affirmative action consistent with law to overcome the effects of...

  16. 31 CFR 28.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Remedial and affirmative action and... FINANCIAL ASSISTANCE Introduction § 28.110 Remedial and affirmative action and self-evaluation. (a) Remedial... activity, a recipient may take affirmative action consistent with law to overcome the effects of...

  17. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial and affirmative action by recipients. 90..., Conciliation and Enforcement Procedures § 90.49 Remedial and affirmative action by recipients. (a) Where a... remedial action. (b) Even in the absence of a finding of discrimination, a recipient may take...

  18. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Remedial and affirmative action by recipients. 90..., Conciliation and Enforcement Procedures § 90.49 Remedial and affirmative action by recipients. (a) Where a... remedial action. (b) Even in the absence of a finding of discrimination, a recipient may take...

  19. 31 CFR 28.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Remedial and affirmative action and... FINANCIAL ASSISTANCE Introduction § 28.110 Remedial and affirmative action and self-evaluation. (a) Remedial... activity, a recipient may take affirmative action consistent with law to overcome the effects of...

  20. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial and affirmative action by recipients. 90..., Conciliation and Enforcement Procedures § 90.49 Remedial and affirmative action by recipients. (a) Where a... remedial action. (b) Even in the absence of a finding of discrimination, a recipient may take...

  1. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Remedial and affirmative action by recipients. 90..., Conciliation and Enforcement Procedures § 90.49 Remedial and affirmative action by recipients. (a) Where a... remedial action. (b) Even in the absence of a finding of discrimination, a recipient may take...

  2. 31 CFR 28.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Remedial and affirmative action and... FINANCIAL ASSISTANCE Introduction § 28.110 Remedial and affirmative action and self-evaluation. (a) Remedial... activity, a recipient may take affirmative action consistent with law to overcome the effects of...

  3. 45 CFR 605.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Remedial action, voluntary action, and self-evaluation. 605.6 Section 605.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING...

  4. 45 CFR 605.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Remedial action, voluntary action, and self-evaluation. 605.6 Section 605.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING...

  5. 45 CFR 605.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Remedial action, voluntary action, and self-evaluation. 605.6 Section 605.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING...

  6. 45 CFR 605.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Remedial action, voluntary action, and self-evaluation. 605.6 Section 605.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING...

  7. 45 CFR 605.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Remedial action, voluntary action, and self-evaluation. 605.6 Section 605.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING...

  8. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... self-evaluation. 8b.6 Section 8b.6 Commerce and Foreign Trade Office of the Secretary of Commerce... DEPARTMENT OF COMMERCE General Provisions § 8b.6 Remedial action, voluntary action, and self-evaluation. (a... or this part and where another recipient exercises control over the recipient that has...

  9. 45 CFR 1232.7 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Remedial action, voluntary action and self-evaluation. 1232.7 Section 1232.7 Public Welfare Regulations Relating to Public Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE NONDISCRIMINATION ON BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL...

  10. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... self-evaluation. 8b.6 Section 8b.6 Commerce and Foreign Trade Office of the Secretary of Commerce... DEPARTMENT OF COMMERCE General Provisions § 8b.6 Remedial action, voluntary action, and self-evaluation. (a... or this part and where another recipient exercises control over the recipient that has...

  11. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... self-evaluation. 8b.6 Section 8b.6 Commerce and Foreign Trade Office of the Secretary of Commerce... DEPARTMENT OF COMMERCE General Provisions § 8b.6 Remedial action, voluntary action, and self-evaluation. (a... or this part and where another recipient exercises control over the recipient that has...

  12. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Remedial action, voluntary action, and self-evaluation. 8b.6 Section 8b.6 Commerce and Foreign Trade Office of the Secretary of Commerce PROHIBITION OF DISCRIMINATION AGAINST THE HANDICAPPED IN FEDERALLY ASSISTED PROGRAMS OPERATED BY THE DEPARTMENT OF COMMERCE General Provisions §...

  13. 34 CFR 104.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Remedial action, voluntary action, and self-evaluation. 104.6 Section 104.6 Education Regulations of the Offices of the Department of Education OFFICE FOR CIVIL RIGHTS, DEPARTMENT OF EDUCATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL...

  14. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Remedial action, voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) NONDISCRIMINATION IN FEDERALLY-ASSISTED PROGRAMS OF THE DEPARTMENT OF VETERANS AFFAIRS-EFFECTUATION OF TITLE VI...

  15. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... self-evaluation. 8b.6 Section 8b.6 Commerce and Foreign Trade Office of the Secretary of Commerce... DEPARTMENT OF COMMERCE General Provisions § 8b.6 Remedial action, voluntary action, and self-evaluation. (a... or this part and where another recipient exercises control over the recipient that has...

  16. 34 CFR 104.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Remedial action, voluntary action, and self-evaluation. 104.6 Section 104.6 Education Regulations of the Offices of the Department of Education OFFICE FOR CIVIL RIGHTS, DEPARTMENT OF EDUCATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL...

  17. 45 CFR 84.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Remedial action, voluntary action, and self-evaluation. 84.6 Section 84.6 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General Provisions § 84.6...

  18. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Remedial action, voluntary action, and self-evaluation. 1170.52 Section 1170.52 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES...

  19. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Remedial action, voluntary action, and self-evaluation. 1170.52 Section 1170.52 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES...

  20. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Remedial action, voluntary action, and self-evaluation. 1170.52 Section 1170.52 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES...

  1. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Remedial action, voluntary action, and self-evaluation. 1170.52 Section 1170.52 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES...

  2. Current activities handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-27

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  3. Hazardous Waste Remedial Actions Program annual progress report, FY 1990

    SciTech Connect

    Not Available

    1990-12-01

    The Hazardous Waste Remedial Actions Programs (HAZWRAP), a unit of Martin Marietta Energy Systems, Inc., supports the Department of Energy (DOE) Oak Ridge Operations Office in broadly environmental areas, especially those relating to waste management and environmental restoration. HAZWRAP comprises six program areas, which are supported by central administrative and technical organizations. Existing programs deal with airborne hazardous substances, pollution prevention, remedial actions planning, environmental restoration, technology development, and information and data systems. HAZWRAP's mission to develop, promote, and apply-cost-effective hazardous waste management and environmental technologies to help solve national problems and concerns. HAZWRAP seeks to serve as integrator for hazardous waste and materials management across the federal government. It applies the unique combination of research and development (R D) capabilities, technologies, management expertise, and facilities in the Energy Systems complex to address problems of national importance. 24 figs., 10 tabs.

  4. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect

    DOE /NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  5. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  6. Shortcomings of the human brain and remedial action by religion

    NASA Astrophysics Data System (ADS)

    Reich, K. Helmut

    2010-03-01

    There is no consensus as to whether, and if so, in which regard and to what extent science and religion is needed for human survival. Here a circumscribed domain is taken up: the sovereignty and sufficiency of the human brain in this context. Several of its shortcomings are pointed out. Religion and other aspects of culture are needed for remedial action. To determine such an action, a broad-based dialogue is required, based on the most promising ontology and epistemology as well as on appropriate logics.

  7. Using soil function evaluation in multi-criteria decision analysis for sustainability appraisal of remediation alternatives.

    PubMed

    Volchko, Yevheniya; Norrman, Jenny; Rosén, Lars; Bergknut, Magnus; Josefsson, Sarah; Söderqvist, Tore; Norberg, Tommy; Wiberg, Karin; Tysklind, Mats

    2014-07-01

    Soil contamination is one of the major threats constraining proper functioning of the soil and thus provision of ecosystem services. Remedial actions typically only address the chemical soil quality by reducing total contaminant concentrations to acceptable levels guided by land use. However, emerging regulatory requirements on soil protection demand a holistic view on soil assessment in remediation projects thus accounting for a variety of soil functions. Such a view would require not only that the contamination concentrations are assessed and attended to, but also that other aspects are taking into account, thus addressing also physical and biological as well as other chemical soil quality indicators (SQIs). This study outlines how soil function assessment can be a part of a holistic sustainability appraisal of remediation alternatives using multi-criteria decision analysis (MCDA). The paper presents a method for practitioners for evaluating the effects of remediation alternatives on selected ecological soil functions using a suggested minimum data set (MDS) containing physical, biological and chemical SQIs. The measured SQIs are transformed into sub-scores by the use of scoring curves, which allows interpretation and the integration of soil quality data into the MCDA framework. The method is demonstrated at a study site (Marieberg, Sweden) and the results give an example of how soil analyses using the suggested MDS can be used for soil function assessment and subsequent input to the MCDA framework. PMID:24529453

  8. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    SciTech Connect

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  9. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  10. Expedited Remedial Action Program (SB 923): A California Brownfields initiative

    SciTech Connect

    Cambridge, M.; Wolfenden, A.K.

    1996-12-31

    California`s Expedited Remedial Action Program (ERAP) created a comprehensive program that promotes an equitable and expedited approach for redevelopment of properties contaminated with hazardous substances. This bill embodies an emerging trend in environmental policy that permits flexibility, cooperation and creativity without compromising protection to public health or the environment. Within the California Environmental Protection Agency, the Department of Toxic Substances Control (DTSC) is promoting a number of programs to facilitate the restoration of contaminated properties as part of its Brownfields initiative. ERAP represents a potentially more efficient process to remediate sites by minimizing economic risks through a clearly identified liability scheme, indemnifying future owners through a covenant not to sue, and providing risk based cleanups that are based on the permanent use of the site.

  11. Expedited remedial action -- A promising opportunity at your doorstep

    SciTech Connect

    Newman, E.R.

    1996-12-31

    The Expedited Remedial Action Program or ERAP carries great promise and is limited to no more than 30 sites, there are a number of slots now available, and the legislature will soon be considering a reauthorization of the full state Superfund program, which expires in June 1998, to reportedly be based to a great extent on the ERAP model. The ERAP provides for: (1) The early identification of fair and equitable shares of liability, including an orphan share, where appropriate, to be paid by the state; (2) The elimination of all joint and several liability; (3) Cleanup levels and remedies based on the foreseeable planned use of the site; (4) Site specific risk assessments based on the latest risk assessment protocols; (5) Use of an arbitrator to quickly resolve all significant liability and technical disputes; and (6) Broad and timely releases from future liability upon completion of cleanup.

  12. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  13. 40 CFR Appendix D to Part 300 - Appropriate Actions and Methods of Remedying Releases

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Remedying Releases D Appendix D to Part 300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. D Appendix D to Part 300—Appropriate Actions and Methods of Remedying Releases (a) This appendix D to part 300 describes types of remedial actions...

  14. 40 CFR Appendix D to Part 300 - Appropriate Actions and Methods of Remedying Releases

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Remedying Releases D Appendix D to Part 300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. D Appendix D to Part 300—Appropriate Actions and Methods of Remedying Releases (a) This appendix D to part 300 describes types of remedial actions...

  15. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Introduction § 101-4.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the... recipient may take affirmative action consistent with law to overcome the effects of conditions...

  16. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Introduction § 101-4.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the... recipient may take affirmative action consistent with law to overcome the effects of conditions...

  17. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 29 Labor 1 2010-07-01 2010-07-01 true Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that...

  18. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Remedial and affirmative action and self-evaluation... affirmative action and self-evaluation. (a) Remedial action. If the Secretary finds that a recipient has.... (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  19. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation... affirmative action and self-evaluation. (a) Remedial action. If the Secretary finds that a recipient has.... (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  20. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 29 Labor 1 2011-07-01 2011-07-01 false Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that...

  1. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation... affirmative action and self-evaluation. (a) Remedial action. If the Secretary finds that a recipient has.... (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  2. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 29 Labor 1 2013-07-01 2013-07-01 false Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that...

  3. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 29 Labor 1 2014-07-01 2013-07-01 true Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that...

  4. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 29 Labor 1 2012-07-01 2012-07-01 false Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that...

  5. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Remedial and affirmative action and self-evaluation... affirmative action and self-evaluation. (a) Remedial action. If the Secretary finds that a recipient has.... (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  6. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Introduction § 101-4.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the... recipient may take affirmative action consistent with law to overcome the effects of conditions...

  7. Mitigation action plan for remedial action at the uranium mill tailings sites and disposal site, Rifle, Colorado

    SciTech Connect

    Not Available

    1992-12-01

    The Old and New Rifle sites cover 66 hectares (164 acres) of private land just outside the town of Rifle, in northwestern Colorado. Approximately 3,161,620 cubic meters (4,135,000 cubic yards) of Residual Radioactive Materials (RRM) contaminates the sites and the adjacent land. The tailings piles at both sites have been partially stabilized, seeded, and irrigated to promote a native vegetation cover. In May 1987, the DOE released its draft EIS on remedial actions at the Rifle sites (DOE, 1987) for public comment. The draft EIS analyzed four alternatives, including: No action; Stabilizing all of the RRM at the New Rifle site; Disposal of all of the RRM at the Estes Guich site, which was the preferred alternative; Disposal of all of the RRM at the Lucas Mesa site.

  8. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    SciTech Connect

    Deeb, Rula A.; Hawley, Elisabeth L.

    2013-07-01

    alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)

  9. Missouri State information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  10. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  11. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  12. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  13. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    SciTech Connect

    1984-05-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs.

  14. International Older Driver Consensus Conference on Assessment, Remediation and Counseling for Transportation Alternatives: Summary and Recommendations

    PubMed Central

    Stephens, Burton W.; McCarthy, Dennis P.; Marsiske, Michael; Shechtman, Orit; Classen, Sherrilene; Justiss, Michael; Mann, William C.

    2010-01-01

    SUMMARY On December 1 and 2, 2003, 63 international experts on older driver issues met to examine three critical issues related to the safe mobility of older drivers. Conference participants addressed standards and protocols for screening and evaluating the skills of older drivers. For drivers judged to lack the necessary skills to drive safely, participants addressed methods of remediation that could enable older persons with limited cognitive or physical abilities to continue to drive. For those persons whose skills are judged inadequate for safe driving, conference participants addressed the question as to how best to counsel individuals and their caregivers on practical alternatives to driving. Consensus was achieved as to the current methods for best assessing and screening drivers, remediation techniques, and providing advice and counsel for those persons and the caregivers as to appropriate actions for those no longer able to drive safely. PMID:20668642

  15. Program overview: Remedial actions at Oak Ridge National Laboratory

    SciTech Connect

    Bates, L.D.; Trabalka, J.R.

    1988-07-27

    Research on and development of civilian and defense uses of nuclear materials and technologies have occurred at Oak Ridge National Laboratory (ORNL) since its creation as part of the World War II Manhattan Project in 1943. A diverse legacy of contaminated inactive facilities, research areas, and waste management areas exists; many are candidates for remedial action. Most attention is focused on waste management sites which contain the bulk of ORNL's environmental contamination. A wide variety of liquid and solid wastes, primarily radioactive wastes or mixed wastes in which radioactivity was the principal hazardous constituent, have been disposed of on-site in the past 45 years. One potential approach to remedial problems at ORNL is to design primarily for control and decay in situ (during an institutional control period of 100 years or more) of intermediate-lived wastes such as /sup 3/H, /sup 90/Sr, and /sup 137/Cs. Passive measures designed to provide greater long-term confinement (for example, in situ vitrification) could be exercised at sites contaminated with TRU wastes or high concentrations of hazardous constitutes. This approach would (a) provide a period sufficiently long for evaluation of the effectiveness of environmental processes and passive remedial measures in controlling the migration of long-lived materials, (b) allow additional time needed for development of new technologies for more permanent site stabilization, and (c) reduce the need for immediate implementation of the more-expensive exhumation and disposal option.

  16. Environmental assessment of remedial action at vicinity properties associated with the former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado

    SciTech Connect

    1986-07-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the UMTRA Project vicinity properties in Mesa County, Colorado. Vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as a building material or as fill material before the hazards associated with this material were known. It is estimated that 3585 contaminated properties remain to be formally included on the vicinity property list and thereby require remedial action. The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law 95-604, authorized the US Department of Energy to perform remedial action at these properties. The US Environmental Protection Agency promulqated standards for remedial action (40 CRF Part 192). The alternatives addressed in this environmental assessment (EA) including taking no action toward remedial action at the vicinity properties, conducting remedial action at a rate of 500 properties per year, and conducting remedial action at a rate of 800 properties per year. 3 figs., 4 tabs.

  17. Oregon state information handbook formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  18. Ohio state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    Not Available

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  19. Oregon state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  20. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  1. California state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  2. Florida state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  3. Mitigation of Remedial Action Schemes by Decentralized Robust Governor Control

    SciTech Connect

    Elizondo, Marcelo A.; Marinovici, Laurentiu D.; Lian, Jianming; Kalsi, Karanjit; Du, Pengwei

    2014-04-15

    This paper presents transient stability improvement by a new distributed hierarchical control architecture (DHC). The integration of remedial action schemes (RAS) to the distributed hierarchical control architecture is studied. RAS in power systems are designed to maintain stability and avoid undesired system conditions by rapidly switching equipment and/or changing operating points according to predetermined rules. The acceleration trend relay currently in use in the US western interconnection is an example of RAS that trips generators to maintain transient stability. The link between RAS and DHC is through fast acting robust turbine/governor control that can also improve transient stability. In this paper, the influence of the decentralized robust turbine/governor control on the design of RAS is studied. Benefits of combining these two schemes are increasing power transfer capability and mitigation of RAS generator tripping actions; the later benefit is shown through simulations.

  4. Maryland State information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  6. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  7. Remedial action assessment system: Decision support for environmental cleanup

    SciTech Connect

    Pennock, K.A.; Bohn, S.; Franklin, A.L.

    1991-11-01

    A large number of hazardous waste sites across the United States await treatment. Waste sites can be physically complex entities composed of multiple, possibly interacting contaminants distributed throughout one or more media. The sites may be active as well with contaminants escaping through one or more potential escape paths. Treatment of these sites requires a long and costly commitment involving the coordination of activities among several waste treatment professionals. In order to reduce the cost and time required for the specification of treatment at these waste sites. The Remedial Action Assessment System (RAAS) was proposed. RAAS is an automated information management system which utilizes a combination of expert reasoning and numerical models to produce the combinations of treatment technologies, known as treatment trains, which satisfy the treatment objectives of a particular site. In addition, RAAS supports the analysis of these trains with regard to effectiveness and cost so that the viable treatment trains can be measured against each other. The Remedial Action Assessment System is a hybrid system designed and constructed using object-oriented tools and techniques. RAAS is advertised as a hybrid system because it combines, in integral fashion, numerical computing (primarily quantitative models) with expert system reasoning. An object-oriented approach was selected due to many of its inherent advantages, among these the naturalness of modeling physical objects and processes.

  8. Risk assessment in the DOE Assurance Program for Remedial Action

    SciTech Connect

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

  9. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  10. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  11. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  12. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Remedial and affirmative action by... 1975, AS AMENDED § 117.6 Remedial and affirmative action by recipients. (a) Where a recipient is found...) Even in the absence of a finding of discrimination, a recipient may take affirmative action to...

  13. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  14. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Remedial and affirmative action... Receiving Federal Financial Assistance Introduction § 113.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  15. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding...

  16. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Remedial and affirmative action and self-evaluation... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 106.3 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  17. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  18. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  19. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Remedial and affirmative action and self... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  20. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  1. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  2. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation...

  3. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  4. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power... what circumstances must recipients take remedial or affirmative action? (a) Where a recipient is found... absence of a finding of discrimination, a recipient may take affirmative action to overcome the effects...

  5. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Remedial and affirmative action... Receiving Federal Financial Assistance Introduction § 113.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  6. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation...

  7. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Remedial and affirmative action and self... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  8. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding...

  9. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Remedial and affirmative action by... 1975, AS AMENDED § 117.6 Remedial and affirmative action by recipients. (a) Where a recipient is found...) Even in the absence of a finding of discrimination, a recipient may take affirmative action to...

  10. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power... what circumstances must recipients take remedial or affirmative action? (a) Where a recipient is found... absence of a finding of discrimination, a recipient may take affirmative action to overcome the effects...

  11. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  12. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation...

  13. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding...

  14. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power and... circumstances must recipients take remedial or affirmative action? (a) Where a recipient is found to have... a finding of discrimination, a recipient may take affirmative action to overcome the effects...

  15. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Remedial and affirmative action by... 1975, AS AMENDED § 117.6 Remedial and affirmative action by recipients. (a) Where a recipient is found...) Even in the absence of a finding of discrimination, a recipient may take affirmative action to...

  16. 14 CFR § 1253.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Remedial and affirmative action and self... FINANCIAL ASSISTANCE Introduction § 1253.110 Remedial and affirmative action and self-evaluation. (a.... (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  17. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  18. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  19. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  20. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Remedial and affirmative action... Receiving Federal Financial Assistance Introduction § 113.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  1. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation...

  2. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding...

  3. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false Remedial and affirmative action and self-evaluation... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 106.3 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  4. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Remedial and affirmative action and self-evaluation... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 106.3 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  5. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Remedial and affirmative action... Receiving Federal Financial Assistance Introduction § 113.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  6. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  7. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Remedial and affirmative action by... 1975, AS AMENDED § 117.6 Remedial and affirmative action by recipients. (a) Where a recipient is found...) Even in the absence of a finding of discrimination, a recipient may take affirmative action to...

  8. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Remedial and affirmative action and self-evaluation... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 106.3 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  9. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  10. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power... what circumstances must recipients take remedial or affirmative action? (a) Where a recipient is found... absence of a finding of discrimination, a recipient may take affirmative action to overcome the effects...

  11. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding...

  12. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation...

  13. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Remedial and affirmative action and self... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  14. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  15. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    SciTech Connect

    Not Available

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.

  16. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  17. Expedited approach to a carbon tetrachloride spill interim remedial action

    SciTech Connect

    Cowdery, C.; Primrose, A.; Uhland, J.; Castaneda, N.

    1998-07-01

    Monitored natural attenuation was selected as an interim measure for a carbon tetrachloride spill site where source removal or in situ treatment cannot currently be implemented due to the surrounding infrastructure. Rather than delay action until the site is more accessible to an interim action, this more expedited approach would support a final action. Individual Hazard Substance Site (IHSS) 118.1 is a former underground storage tank at Rocky Flats Environmental Technology Site (RFETS) that stored carbon tetrachloride for process use. Inadvertent releases associated with filling and failure of the tank system resulted in an accumulation of carbon tetrachloride in a bedrock depression around a group of former process waste tanks. Access to the source of contamination is obstructed by numerous utilities, the process waste tanks, and other components of the site infrastructure that limit the ability to conduct an effective remedial action. A preremedial field investigation was conducted in September 1997 to identify and delineate the extent of the dense nonaqueous phase liquid (DNAPL) in the subsurface. Data collected from the investigation revealed that natural processes might be limiting the migration of contaminants from the source area.

  18. Dynamic remedial action scheme using online transient stability analysis

    NASA Astrophysics Data System (ADS)

    Shrestha, Arun

    Economic pressure and environmental factors have forced the modern power systems to operate closer to their stability limits. However, maintaining transient stability is a fundamental requirement for the operation of interconnected power systems. In North America, power systems are planned and operated to withstand the loss of any single or multiple elements without violating North American Electric Reliability Corporation (NERC) system performance criteria. For a contingency resulting in the loss of multiple elements (Category C), emergency transient stability controls may be necessary to stabilize the power system. Emergency control is designed to sense abnormal conditions and subsequently take pre-determined remedial actions to prevent instability. Commonly known as either Remedial Action Schemes (RAS) or as Special/System Protection Schemes (SPS), these emergency control approaches have been extensively adopted by utilities. RAS are designed to address specific problems, e.g. to increase power transfer, to provide reactive support, to address generator instability, to limit thermal overloads, etc. Possible remedial actions include generator tripping, load shedding, capacitor and reactor switching, static VAR control, etc. Among various RAS types, generation shedding is the most effective and widely used emergency control means for maintaining system stability. In this dissertation, an optimal power flow (OPF)-based generation-shedding RAS is proposed. This scheme uses online transient stability calculation and generator cost function to determine appropriate remedial actions. For transient stability calculation, SIngle Machine Equivalent (SIME) technique is used, which reduces the multimachine power system model to a One-Machine Infinite Bus (OMIB) equivalent and identifies critical machines. Unlike conventional RAS, which are designed using offline simulations, online stability calculations make the proposed RAS dynamic and adapting to any power system

  19. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE`s Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  20. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  1. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    SciTech Connect

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-02-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded.

  2. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  3. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  4. Remedial actions: A discussion of technological, regulatory and construction issues

    SciTech Connect

    Manrod, W.E.; Miller, R.A.; Barton, W.D. III; Pierce, T.J.

    1989-11-01

    The Oak Ridge Reservation consists of approximately 35,252 acres located in the Ridge and Valley Province of the Appalachian Mountains in Eastern Tennessee. Three Department of Energy facilities are located on the Reservation: the Y-12 Plant, the Oak Ridge Gaseous Diffusion Plant and the Oak Ridge National Laboratory. The plants have, over the years, disposed of low-level and mixed waste in various areas on the reservation principally with shallow land burial. A discussion is presented of some of the actions to remediate and close areas used for disposal of waste in the past. Current or planned activities for waste disposal and storage are also discussed. Closures completed to date have complied with Resource Conservation and Recovery Act Regulations. The new approach for disposal and storage has adopted ideas that have been successfully used by the French to dispose of low-level waste, as well as, improved on older shallow burial disposal techniques.

  5. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    SciTech Connect

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  6. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  7. Sandia's activities in uranium mill tailings remedial action

    SciTech Connect

    Neuhauser, S.

    1980-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 requires that remedial action be taken at over 20 inactive uranium mill tailings sites in the United States. Standards promulgated by the EPA under this act are to be the operative standards for this activity. Proposed standards must still undergo internal review, public comment, and receive Nuclear Regulatory Commission concurrence before being finalized. Briefly reviewed, the standards deal separately with new disposal sites (Part A) and cleanup of soil and contaminated structures at existing locations (Part B). In several cases, the present sites are felt to be too close to human habitations or to be otherwise unacceptably located. These tailings will probably be relocated. New disposal sites for relocated tailings must satisfy certain standards. The salient features of these standards are summarized.

  8. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    SciTech Connect

    Hardy, A.J.; Redmond, J.V.; River, R.A.; Davis, C.S.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snow melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.

  9. Ecological effects of contaminants and remedial actions in Bear Creek

    SciTech Connect

    Southworth, G.R.; Loar, J.M.; Ryon, M.G.; Smith, J.G.; Stewart, A.J. ); Burris, J.A. )

    1992-01-01

    Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bear Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.

  10. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise...

  11. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise...

  12. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise...

  13. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise...

  14. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise...

  15. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 5.110 Remedial and affirmative action and self-evaluation....

  16. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Remedial and affirmative action and self-evaluation. 15a.3 Section 15a.3 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Introduction § 15a.3 Remedial and affirmative action and self-evaluation. (a)...

  17. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 5.110 Remedial and affirmative action and self-evaluation....

  18. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a)...

  19. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a)...

  20. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    SciTech Connect

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  1. 47 CFR 19.735-107 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Disciplinary and other remedial action. 19.735... RESPONSIBILITIES AND CONDUCT General Provisions § 19.735-107 Disciplinary and other remedial action. (a) A violation of the regulations in this part by an employee may be cause for appropriate disciplinary...

  2. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation...

  3. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation...

  4. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation...

  5. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation...

  6. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation...

  7. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process.

  8. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Shiprock, New Mexico

    SciTech Connect

    Hill, T.V.; Morley, J.A. . Uranium Mill Tailings Remedial Action Project Office); Began, E.T. )

    1985-06-01

    This Remedial Action Plan (RAP) has been developed to serve a twofold purpose. It presents the series of activities which are proposed by the Department of Energy (DOE) to effect long-term control of radioactive materials at the inactive uranium processing site located on the Navajo Reservation at Shiprock, New Mexico. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Shiprock site. Detailed supporting information can be found in appendices and referenced documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 traces the history of operations at the Shiprock site with a description of the present site characteristics. Section 4.0 provides a definition of site-specific problems, a listing of remedial action alternatives which have been considered, and the action which is being proposed. Section 5.0 presents a summary of the conceptual design for the proposed action which includes objectives, design features, schedule, cost, and implementation methods. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the onsite workers. Section 7.0 presents a detailed listing of the responsibilities of the project participants. Section 8.0 describes the quality assurance process that will be used by the RAC during construction. Section 9.0 describes the features of the long-term maintenance and surveillance plan. Section 10.0 documents the on-going activities to keep the public informed and participating in the project. Attached as part of the RAP are five appendices which describe in more detail various aspects of the remedial action.

  9. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project

    SciTech Connect

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

  10. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  11. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  12. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  13. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  14. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  15. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  16. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  17. 31 CFR 50.80 - Federal cause of action and remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Federal cause of action and remedy... RISK INSURANCE PROGRAM Federal Cause of Action; Approval of Settlements § 50.80 Federal cause of action... 102 of the Act, there shall exist a Federal cause of action for property damage, personal injury,...

  18. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  19. Environmental Response to Remedial Actions at the Weldon Spring Site--An Environmental Success Story

    SciTech Connect

    Meier, J. A.; Welton, T. D.

    2002-02-27

    Environmental remediation activities have been ongoing at the Weldon Spring Site for over a decade, beginning with small interim response actions and culminating in completion of surface cleanup as represented by closure of the 17 hectare (42-acre) on-site disposal cell. As remedial actions have incrementally been accomplished, the occurrence of site-related contaminants in on and off-site environmental media have effectively been reduced. The DOE-WSSRAP has demonstrated success through the effective reduction or elimination of site related water and airborne contaminants along multiple migration pathways. This paper briefly describes the remedial measures affected at Weldon Spring, and quantifies the environmental responses to those remedial measures.

  20. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect

    Not Available

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  1. Uranium Mill Tailings Remedial Action Program. Annual status report

    SciTech Connect

    Not Available

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981.

  2. ENGINEERING BULLETINS: AIDS TO THE DEVELOPMENT OF REMEDIAL ALTERNATIVES

    EPA Science Inventory

    This paper provides the background for and an introduction to the new series of EPA documents called "Engineering Bulletins." ngineering Bulletins summarize the latest information available on selected waste treatment and contaminated site remediation technologies and related iss...

  3. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    SciTech Connect

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    SciTech Connect

    Not Available

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    SciTech Connect

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  6. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    SciTech Connect

    Miles, W.C. Jr.

    1992-10-28

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs{sup 137}). The Tank 16 bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action.

  7. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    SciTech Connect

    Miles, W.C. Jr.

    1992-10-28

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs[sup 137]). The Tank 16 bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action.

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    SciTech Connect

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  9. Weldon Spring quarry construction staging area and water treatment plant site remedial action characterization report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1991-09-01

    The quarry construction staging area (QCSA) and water treatment plant (WTP) are located in the areas that border the western edge of the Weldon Spring quarry (WSQ). These facilities were constructed to support bulk waste removal from the WSQ. This area was contaminated with U-238, Ra-226, and Th-230 and was remediated prior to construction in order to allow release of the area for use without radiological restrictions. This report documents the methods of characterization, the remediation activities, and the post remedial action sampling methods and analytical results. 4 refs., 6 figs., 4 tabs.

  10. Operable Unit 3-13, Group 3, Other Surface Soils (Phase I) Remedial Action Report

    SciTech Connect

    L. Davison

    2007-07-31

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 3, Other Surface Soils, Phase I sites at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The 10 sites addressed in this report were defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for these 10 sites have been accomplished and are hereafter considered No Action or No Further Action sites.

  11. FEASIBILITY OF HYDRAULIC FRACTURING OF SOILS TO IMPROVE REMEDIAL ACTIONS

    EPA Science Inventory

    Hydraulic fracturing, a method of increasing fluid flow within the subsurface, should improve the effectiveness of several remedial techniques, including pump and treat, vapor extraction, bio-remediation, and soil-flushing. he technique is widely used to increase the yields of oi...

  12. Department of Energy hazardous waste remedial actions program: Quality assurance program

    SciTech Connect

    Horne, T.E.

    1988-01-01

    This paper describes the Quality Assurance Program developed for the Hazardous Waste Remedial Actions Program Support Contractor Office (HAZWRAP SCO). Key topics discussed include an overview of the HAZWRAP SCO mission and organization, the basic quality assurance program requirements and the requirements for the control of quality for the Department of Energy and Work for Others hazardous waste management programs, and the role of ensuring quality through the project team concept for the management of remedial response actions. The paper focuses on planning for quality assurance for this remedial waste management process from preliminary assessments of remedial sites to feasibility studies. Some observations concerning the control of quality during the implementation of remedial actions are presented. (2 refs.)

  13. Proceedings: 1985 EPRI Workshop on Remedial Actions for Secondary-Side Intergranular Corrosion

    SciTech Connect

    1986-12-01

    During 1984 and 1985, several EPRI projects provided data showing that remedial actions can retard or stop intergranular corrosion and stress corrosion cracking in PWR steam generators. These remedies change either crevice-fluid pH, crevice-fluid concentration, or oxide-film composition on structural alloys.

  14. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 17.110 Section 17.110 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 17.110 Remedial...

  15. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Remedial and affirmative action and self-evaluation. 41.110 Section 41.110 Public Lands: Interior Office of the Secretary of the Interior NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 41.110 Remedial...

  16. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self-evaluation. 25.110 Section 25.110 Transportation Office of the Secretary of Transportation NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 25.110 Remedial and affirmative...

  17. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self-evaluation. 41.110 Section 41.110 Public Lands: Interior Office of the Secretary of the Interior NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 41.110 Remedial...

  18. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Remedial and affirmative action by recipients. 117.6 Section 117.6 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES OF SBA-EFFECTUATION OF THE AGE DISCRIMINATION ACT OF 1975, AS AMENDED § 117.6 Remedial...

  19. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Remedial and affirmative action and self-evaluation. 54.110 Section 54.110 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 54.110 Remedial...

  20. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 17.110 Section 17.110 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 17.110 Remedial...

  1. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Remedial and affirmative action and self-evaluation. 86.3 Section 86.3 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 86.3 Remedial...

  2. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Remedial and affirmative action and self-evaluation. 17.110 Section 17.110 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 17.110 Remedial...

  3. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Remedial and affirmative action and self-evaluation. 41.110 Section 41.110 Public Lands: Interior Office of the Secretary of the Interior NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 41.110 Remedial...

  4. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  5. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 23.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action consistent with law to overcome...

  6. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... affirmative action and self-evaluation. 1317.110 Section 1317.110 Conservation of Power and Water Resources... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1317.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  7. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL FINANCIAL ASSISTANCE Introduction § 1317.110 Remedial and affirmative action and self-evaluation... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action consistent with law to overcome...

  8. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 32 National Defense 2 2013-07-01 2013-07-01 false Remedial and affirmative action and self... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  9. 10 CFR 4.338 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Remedial and affirmative action by recipients. 4.338... and affirmative action by recipients. (a) Where NRC finds a recipient has discriminated on the basis... discrimination, a recipient may take affirmative action to overcome the effects of conditions that resulted...

  10. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 10 Energy 1 2014-01-01 2014-01-01 false Remedial and affirmative action and self-evaluation. 5.110... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  11. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 32 National Defense 2 2011-07-01 2011-07-01 false Remedial and affirmative action and self... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  12. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 10 Energy 1 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 5.110... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  13. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... affirmative action and self-evaluation. 1317.110 Section 1317.110 Conservation of Power and Water Resources... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1317.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  14. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 32 National Defense 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  15. 10 CFR 4.338 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Remedial and affirmative action by recipients. 4.338... and affirmative action by recipients. (a) Where NRC finds a recipient has discriminated on the basis... discrimination, a recipient may take affirmative action to overcome the effects of conditions that resulted...

  16. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 23.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action consistent with law to overcome...

  17. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 10 Energy 1 2013-01-01 2013-01-01 false Remedial and affirmative action and self-evaluation. 5.110... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  18. 10 CFR 4.338 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Remedial and affirmative action by recipients. 4.338... and affirmative action by recipients. (a) Where NRC finds a recipient has discriminated on the basis... discrimination, a recipient may take affirmative action to overcome the effects of conditions that resulted...

  19. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 32 National Defense 2 2014-07-01 2014-07-01 false Remedial and affirmative action and self... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  20. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 23.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action consistent with law to overcome...

  1. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... affirmative action and self-evaluation. 1317.110 Section 1317.110 Conservation of Power and Water Resources... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1317.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in...

  2. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affirmative action obligations that a recipient may have under Executive Order 11246, 3 CFR, 1964-1965 Comp... 32 National Defense 2 2012-07-01 2012-07-01 false Remedial and affirmative action and self... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination...

  3. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect

    Not Available

    1985-12-01

    FY 1985 project accomplishments include: completed 90% of the processing site remedial actions at Canonsburg, Pennsylvania, and initiated remedial actions at Salt Lake City, Utah, and Shiprock, New Mexico; awarded remedial action contracts on 329 vicinity properties at seven designated locations and completed survey and inclusion activities on a total of 1620 vicinity properties; published the Environmental Assessment (EA) for Lakeview, Oregon, issued the draft and prepared the final Environmental Impact Statement (EIS) for Durango, Colorado; completed the Remedial Action Plan (RAP) for Lakeview, Oregon, and prepared the draft RAP for Durango, Colorado; executed cooperative agreements with Idaho, New Mexico, and the Navajo Nation/Hopi Tribe; executed a Memorandum of Understanding with the Nuclear Regulatory Commission; and developed proposed UMTRA Project design review criteria between DOE and the NRC.

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    SciTech Connect

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  5. Final Environmental Assessment of remedial action at the Falls City uranium mill tailings site, Falls City, Texas

    SciTech Connect

    Not Available

    1991-12-01

    This environmental assessment (EA) is prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts that their actions may have on the environment. This EA examines the short- and long-term effects of the DOE`s proposed remedial action for the Falls City tailings site. The no action alternative is also examined. The DOE will use the information and analyses presented here to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an EIS will be prepared. If the impacts are not judged to be significant, the DOE will issue an official ``Finding of No Significant Impact`` and implement the proposed action.

  6. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    SciTech Connect

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  7. Environmental impacts of remediation of a trichloroethene-contaminated site: life cycle assessment of remediation alternatives.

    PubMed

    Lemming, Gitte; Hauschild, Michael Z; Chambon, Julie; Binning, Philip J; Bulle, Cécile; Margni, Manuele; Bjerg, Poul L

    2010-12-01

    The environmental impacts of remediation of a chloroethene-contaminated site were evaluated using life cycle assessment (LCA). The compared remediation options are (i) in situ bioremediation by enhanced reductive dechlorination (ERD), (ii) in situ thermal desorption (ISTD), and (iii) excavation of the contaminated soil followed by off-site treatment and disposal. The results showed that choosing the ERD option will reduce the life-cycle impacts of remediation remarkably compared to choosing either ISTD or excavation, which are more energy-demanding. In addition to the secondary impacts of remediation, this study includes assessment of local toxic impacts (the primary impact) related to the on-site contaminant leaching to groundwater and subsequent human exposure via drinking water. The primary human toxic impacts were high for ERD due to the formation and leaching of chlorinated degradation products, especially vinyl chloride during remediation. However, the secondary human toxic impacts of ISTD and excavation are likely to be even higher, particularly due to upstream impacts from steel production. The newly launched model, USEtox, was applied for characterization of primary and secondary toxic impacts and combined with a site-dependent fate model of the leaching of chlorinated ethenes from the fractured clay till site. PMID:21053954

  8. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  9. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    SciTech Connect

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  12. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    SciTech Connect

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  13. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    SciTech Connect

    Not Available

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  14. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    SciTech Connect

    Not Available

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  15. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    SciTech Connect

    Not Available

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  16. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request

    SciTech Connect

    L. Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  17. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report

    SciTech Connect

    Lee Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  18. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    SciTech Connect

    Not Available

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  19. Hydrogeologic analysis of remedial alternatives for the solar ponds plume, RFETS

    SciTech Connect

    McLane, C.F. III; Whidden, J.A.; Hopkins, J.K.

    1998-07-01

    The focus of this paper is to develop a conceptual model and a hydrogeologic analysis plan for remedial alternatives being considered for the remediation of a ground water contaminant plume consisting of chiefly nitrate and uranium. The initial step in this process was to determine the adequacy of the existing data from the vast database of site information. Upon concluding that the existing database was sufficient to allow for the development of a conceptual model and then constructing the conceptual model, a hydrogeologic analysis plan was developed to evaluate several alternatives for plume remediation. The plan will be implemented using a combination of analytical and simple numerical ground water flow and contaminant transport models. This allows each portion of the study to be addressed using the appropriate tool, without having to develop a large three-dimensional numerical ground water flow and transport model, thereby reducing project costs. The analysis plan will consist of a preliminary phase of screening analyses for each of the remedial alternative scenarios, and a second phase of more comprehensive and in-depth analyses on a selected subset of remedial alternative scenarios. One of the alternatives which will be analyzed is phytoremediation (remediation of soil and ground water via uptake of chemicals by plants) because of the potential for relatively low capital and operation and maintenance costs, passive nature, and potential to provide long-term protection of the surface water. The results of these hydrogeological analyses will be factored into the selection of the preferred remedial alternative, or combination of alternatives, for the contaminant plume.

  20. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  1. CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. n gene...

  2. Remedial action selection report Maybell, Colorado, site. Final report

    SciTech Connect

    1996-12-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3}(420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}).

  3. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    SciTech Connect

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

  4. 40 CFR 1502.14 - Alternatives including the proposed action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Alternatives including the proposed action. 1502.14 Section 1502.14 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.14 Alternatives including the proposed action. This section is the heart of...

  5. 40 CFR 1502.14 - Alternatives including the proposed action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Alternatives including the proposed action. 1502.14 Section 1502.14 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.14 Alternatives including the proposed action. This section is the heart of...

  6. 40 CFR 1502.14 - Alternatives including the proposed action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Alternatives including the proposed action. 1502.14 Section 1502.14 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.14 Alternatives including the proposed action. This section is the heart of...

  7. 40 CFR 1502.14 - Alternatives including the proposed action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Alternatives including the proposed action. 1502.14 Section 1502.14 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY ENVIRONMENTAL IMPACT STATEMENT § 1502.14 Alternatives including the proposed action. This section is the heart of...

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    SciTech Connect

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  9. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    SciTech Connect

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  10. Phytoremediation and innovative strategies for specialized remedial actions

    SciTech Connect

    Alleman, B.C.; Leeson, A.

    1999-01-01

    Phytoremediation is a site remediation strategy whose time seems to have come in the past few years, with field implementations taking place in a host of applications. From laboratory studies on plant uptake to full-scale phytoremediation treatment strategies, this volume covers the use of plants to treat contaminants such as hydrocarbons, metals, pesticides, perchlorate, and chlorinated solvents. In addition to the phytoremediation studies, this volume also covers specialized remediation approaches such as sequential anaerobic/aerobic in situ treatment, membrane bioreactors, and Fenton's reagent oxidation.

  11. Evaluation of remedial alternatives for the Solar Ponds Plume, Rocky Flats Environmental Technology Site

    SciTech Connect

    Hranac, K.C.; Chromec, F.W.; Fiehweg, R.; Hopkins, J.

    1998-07-01

    This paper describes the process used to select a remedial alternative for handling contaminated groundwater emanating from the Solar Evaporation Ponds (Solar Ponds) at the Rocky Flats Environmental Technology Site (RFETS) and prevent it from reaching the nearest surface water body, North Walnut Creek. Preliminary results of field investigations conducted to provide additional information for the alternatives analysis are also presented. The contaminated groundwater is referred to as the Solar Ponds Plume (SPP). The primary contaminants in the SPP are nitrate and uranium; however, some metals exceed the site action levels at several locations and volatile organic compounds, originating from other sources, also have been detected. Currently the SPP, local surface water runoff, and infiltrated precipitation are collected by a trench system located downgradient of the Solar Ponds and pumped to three storage tanks. The water (two to three million gallons annually) is then pumped to an on-site treatment plant for evaporation at an approximate cost of $7.57 per liter.

  12. Application of NEPA requirements to CERCLA remedial actions. Master's thesis

    SciTech Connect

    Strobbe, C.L.

    1994-06-01

    This study investigated the application of National Environmental Policy Act (NEPA) requirements to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) actions. Similarities in the documentation and public participation requirements of NEPA and CERCLA include identification and evaluation of alternatives and public participation. Differences include document contents and timing of public participation. This study presented four options for ensuring NEPA compliance at CERCLA sites. Option one included a Programmatic Environmental Impact Statement (PEIS) with subsequent combined FS/EIS report for each subunit. Option two eliminated the PEIS, but retained a stand-alone NEPA document for each CERCLA subunit. Option three included a PEIS with a subsequent combined FS/EIS report for each subunit. Option four eliminated the PEIS but retained a combined FS/EIS report for each subunit. The model presented in this study can be used at any installation to determine the optimal approach for the site. The model's goal is to comply with NEPA and CERCLA while maintaining a balance between cost, schedule, and public acceptance.

  13. 24 CFR 511.82 - Corrective and remedial actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HOUSING AND URBAN DEVELOPMENT SLUM CLEARANCE AND URBAN RENEWAL RENTAL REHABILITATION GRANT PROGRAM Grantee... this part, HUD will follow the procedures described in the Federal Claims Collection Standards (4 CFR... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Corrective and remedial...

  14. 24 CFR 511.82 - Corrective and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT SLUM CLEARANCE AND URBAN RENEWAL RENTAL REHABILITATON GRANT PROGRAM Grantee... this part, HUD will follow the procedures described in the Federal Claims Collection Standards (4 CFR... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Corrective and remedial...

  15. 24 CFR 511.82 - Corrective and remedial actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HOUSING AND URBAN DEVELOPMENT SLUM CLEARANCE AND URBAN RENEWAL RENTAL REHABILITATION GRANT PROGRAM Grantee... this part, HUD will follow the procedures described in the Federal Claims Collection Standards (4 CFR... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Corrective and remedial...

  16. FEASIBILITY OF HYDRAULIC FRACTURING OF SOILS TO IMPROVE REMEDIAL ACTIONS

    EPA Science Inventory

    Hydraulic fracturing, a technique commonly used to increase the yields of oil wells, could improve the effectiveness of several methods of in situ remediation. This project consisted of laboratory and field tests in which hydraulic fractures were created in soil. Laboratory te...

  17. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    SciTech Connect

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  18. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    SciTech Connect

    Not Available

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  19. Remediation of at-risk medical students: theory in action

    PubMed Central

    2013-01-01

    Background Previous work has shown that a programme that draws on a blend of theories makes a positive difference to outcomes for students who fail and repeat their first semester at medical school. Exploration of student and teacher perspectives revealed that remediation of struggling medical students can be achieved through a cognitive apprenticeship within a small community of inquiry. This community needs expert teachers capable of performing a unique combination of roles (facilitator, nurturing mentor, disciplinarian, diagnostician and role model), with high levels of teaching presence and practical wisdom. Yet, despite participants’ convergent opinions on the elements of effective remediation, significant differences were found between outcomes of students working with experienced and inexperienced teachers. The current study explores the actual practice of teachers on this remediation course, aiming to exemplify elements of our theory of remediation and explore differences between teachers. Methods Since it is in the classroom context that the interactions that constitute the complex process of remediation emerge, this practice-based research has focused on direct observation of classroom teaching. Nineteen hours of small group sessions were recorded and transcribed. Drawing on ethnography and sociocultural discourse analysis, selected samples of talk-in-context demonstrate how the various elements of remediation play out in practice, highlighting aspects that are most effective, and identifying differences between experienced and novice teachers. Results Long-term student outcomes are strongly correlated to teacher experience (r, 0.81). Compared to inexperienced teachers, experienced teachers provide more challenging, disruptive facilitation, and take a dialogic stance that encourages more collaborative group dynamics. They are more expert at diagnosing cognitive errors, provide frequent metacognitive time-outs and make explicit links across the

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  1. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  2. Low-cost alternative for remedial sand control application

    SciTech Connect

    Peavy, M.A.; Bush, M.E.; Plummer, M.A. Perez, J.I.

    1995-09-01

    During mid-1992, a remedial workover program was implemented offshore within the Gulf of Mexico on low-rate marginal-reserve sand-producing wellbores. A process called through-tubing gravel packing (TTGP) was used on five offshore wells and one US Gulf Coast land well. This technique involved the placement of ceramic beads and prepacked screen within existing completions with coiled tubing (CT) to eliminate sand production. The basic steps of TTGP consist of wellbore cleanup, CT counter correlation, injectivity testing, running a dummy assembly, ceramic bead placement, prepacked screen placement, and installation of an isolation device. The TTGP method demonstrated versatility in adapting to individual well conditions. This remedial sand control technique was successfully applied in highly deviated wellbores, in the upper zones of a dual completion, and within existing gravel packs for screen repair. Throughout the implementation of this program, mechanical problems were addressed that led to improvements in subsequent workover programs. This paper details the TTGP program and recommends mechanical improvements for performing future through-tubing gravel packs.

  3. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    SciTech Connect

    Not Available

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  4. Rrecord of Decision (EPA Region 1): Groveland Wells, Operable Unit 1, Groveland, MA. (Second remedial action), September 1991. Final report

    SciTech Connect

    Not Available

    1991-09-30

    The 850-acre Groveland Wells site is a municipal well field in Groveland, Massachusetts. The site is underlain by a surfical unconsolidated aquifer, which is a source of ground water for the well field, and a deeper bedrock aquifer. In 1979, elevated levels of TCE were discovered in the onsite water supply wells, resulting in the closure of the wells, development of alternate water supplies, and investigations by EPA. EPA investigations identifed three likely sources of contamination: the A.W. Chesterton Company, currently being remediated under RCRA corrective action and closure activities; the Haverhill Municipal Landfill, which has been addressed as a separate CERCLA action; and the Valley Manufactured Products Company (Valley), a screw machine products manufacturer and finisher. The ROD addresses management of migration of contamination in the surfical and bedrock aquifers extending from the valley site, as a final remedy. The primary contaminants of concern affecting the ground water are VOCs including benzene, PCE, TCE, and toluene; and metals including arsenic, chromium, and lead. The selected remedial action for the site is included.

  5. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect

    Not Available

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ``vicinity properties (VP),`` are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A).

  6. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  7. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken; Gillespie, Joey; Widdop, Michael; none,

    2012-02-26

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

  8. 25 CFR 30.119 - Who is responsible for implementing required remedial actions at a Bureau-funded school...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who is responsible for implementing required remedial actions at a Bureau-funded school identified for school improvement, corrective action or restructuring... restructuring? (a) For a Bureau-operated school, implementation of remedial actions is the responsibility of...

  9. Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites

    SciTech Connect

    Whelan, G. ); Hartz, K.E.; Hilliard, N.D. and Associates, Seattle, WA )

    1990-04-01

    Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluated and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.

  10. Cost-benefit analysis as a part of sustainability assessment of remediation alternatives for contaminated land.

    PubMed

    Söderqvist, Tore; Brinkhoff, Petra; Norberg, Tommy; Rosén, Lars; Back, Pär-Erik; Norrman, Jenny

    2015-07-01

    There is an increasing demand amongst decision-makers and stakeholders for identifying sustainable remediation alternatives at contaminated sites, taking into account that remediation typically results in both positive and negative consequences. Multi-criteria analysis (MCA) is increasingly used for sustainability appraisal, and the Excel-based MCA tool Sustainable Choice Of REmediation (SCORE) has been developed to provide a relevant and transparent assessment of the sustainability of remediation alternatives relative to a reference alternative, considering key criteria in the economic, environmental and social sustainability domains, and taking uncertainty into explicit account through simulation. The focus of this paper is the use of cost-benefit analysis (CBA) as a part of SCORE for assessing the economic sustainability of remediation alternatives. An economic model is used for deriving a cost-benefit rule, which in turn motivates cost and benefit items in a CBA of remediation alternatives. The empirical part of the paper is a CBA application on remediation alternatives for the Hexion site, a former chemical industry area close to the city of Göteborg in SW Sweden. The impact of uncertainties in and correlations across benefit and cost items on CBA results is illustrated. For the Hexion site, the traditional excavation-and-disposal remediation alternative had the lowest expected net present value, which illustrates the importance of also considering other alternatives before deciding upon how a remediation should be carried out. PMID:25913468

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  12. Alternative, Complementary, and Forgotten Remedies for Atopic Dermatitis

    PubMed Central

    Goddard, Allison L.; Lio, Peter A.

    2015-01-01

    Atopic dermatitis, perhaps more than other dermatologic diseases, has garnered much attention in the realm of alternative medicine. This may be because its etiopathogenesis is incompletely understood, it is increasingly common, and it waxes and wanes often without clear precipitants, opening up many opportunities for misinterpretation. Herein we explore the evidence for a number of different alternative and complementary therapies, from textiles to vitamin supplements. By definition, none have enough data to be deemed “effective” in a conventional sense, but it is hopeful that some show promising evidence that may one day lead to mainstream acceptance with further research. PMID:26257817

  13. Academic Remediation-Focused Alternative Schools: Impact on Student Outcomes

    ERIC Educational Resources Information Center

    Wilkerson, Kimber L.; Afacan, Kemal; Yan, Min-Chi; Justin, Whitney; Datar, Sujata D.

    2016-01-01

    School districts offer specialized programming for secondary students who experience high rates of course failure or low credit accumulation. While these alternative programs are meant to increase student success, little research evaluates outcomes for students attending them. In this study, we used propensity score matching (PSM) to investigate…

  14. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    SciTech Connect

    Not Available

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  15. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    SciTech Connect

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  16. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken; Gillespie, Joey; Widdop, Michael

    2012-07-01

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE

  17. Remedial action plan for stabilization of the inactive uranium mill tailings site at Monument Valley, Arizona

    SciTech Connect

    1986-02-01

    This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  18. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  19. The Effectiveness of Conceptual Change Texts in Remediating High School Students' Alternative Conceptions Concerning Chemical Equilibrium

    ERIC Educational Resources Information Center

    Ozmen, Haluk

    2007-01-01

    This study investigated the effectiveness of conceptual change texts in remediating high school students' alternative conceptions concerning chemical equilibrium. A quasi-experimental design was used in this study. The subjects for this study consisted of a total 78 tenth-grade students, 38 of them in the experimental group and 40 of them in the…

  20. The Grimes Alternative School Program and Home Remedies Program. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Williams, Jay R.

    This report describes and evaluates two programs which deal with chronic status offenders: the Grimes Alternative School Program, a delinquency prevention project which targets intermediate school (grades 4 and 5) students with chronic discipline and/or truant behaviors, and the Home Remedies Program, a short-term crisis intervention and…

  1. 36 CFR 905.735-108 - Remedial and disciplinary action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Government employee of the conflicting interest; (2) Disqualification of the individual from a particular assignment; (3) Changes in the assigned duties of the individual; or (4) Disciplinary action. (b) Where...

  2. Alternatives/action plan report for outfall 17

    SciTech Connect

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  3. Y-12 Plant Remedial Action technology logic diagram. Volume I: Technology evaluation

    SciTech Connect

    1994-09-01

    The Y-12 Plant Remedial Action Program addresses remediation of the contaminated groundwater, surface water and soil in the following areas located on the Oak Ridge Reservation: Chestnut Ridge, Bear Creek Valley, the Upper and Lower East Fork Popular Creek Watersheds, CAPCA 1, which includes several areas in which remediation has been completed, and CAPCA 2, which includes dense nonaqueous phase liquid wells and a storage facility. There are many facilities within these areas that are contaminated by uranium, mercury, organics, and other materials. This Technology Logic Diagram identifies possible remediation technologies that can be applied to the soil, water, and contaminants for characterization, treatment, and waste management technology options are supplemented by identification of possible robotics or automation technologies. These would facilitate the cleanup effort by improving safety, of remediation, improving the final remediation product, or decreasing the remediation cost. The Technology Logic Diagram was prepared by a diverse group of more than 35 scientists and engineers from across the Oak Ridge Reservation. Most are specialists in the areas of their contributions. 22 refs., 25 tabs.

  4. 16 CFR 1115.20 - Voluntary remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Rules of Practice for Adjudicative Proceedings (16 CFR part 1025). The Consenting Party shall thereafter... 1115.20 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS... the right to seek broader corrective action if it becomes aware of new facts or if the...

  5. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  6. Botanicals: an alternative remedy to radiotherapy-induced dysuria.

    PubMed

    Jaladat, Amir Mohammad; Atarzadeh, Fatemeh; Rezaeizadeh, Hossein; Mofid, Bahram; Mosalaie, Ahmad; Farhan, Farshid; Amin, Gholamreza

    2015-02-01

    Everyday, many patients get radiotherapy for prostatic, rectal, uterine cervix and other pelvic organs cancer. Dysuria is common in pelvic, especially prostate radiotherapy, but there is not any established and confirmed treatment for this therapeutic side effect. Therefore, an alternative therapeutic method, using herbal preparation, may be an effective solution. This study seeks a defensible suggestion in Iranian Traditional Medicine (ITM). In ITM, a few medicinal herbs such as Plantago psyllium, Cydonia oblonga, Portulaca oleracea and some species of Malvaceae and Cucurbitaceae family are indicated in treating dysuria secondary to urethral moisturizing layer defect and inflammatory disorders. Most of these herbs have mucilaginous characteristics and tissue regeneration ability. This choice can be an appropriate one for radiotherapy-induced dysuria as it is produced by a similar pathophysiology with bladder cell layer injury and urethritis. Pharmacological properties such as anti-oxidant, anti-inflammatory, and anti-ulcerogenic activity of the offered herbs make its use justifiable. In lack of sufficient clinical trials to clarify the clinical outcome, further clinical investigation seems to be necessary. PMID:25637157

  7. 24 CFR 572.225 - Grant agreements; corrective and remedial actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... under 2 CFR part 2424 with respect to future HOPE 3, HUD, or federal grant awards; and (vi) Taking any... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Grant agreements; corrective and remedial actions. 572.225 Section 572.225 Housing and Urban Development Regulations Relating to Housing...

  8. 47 CFR 19.735-107 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... be solely responsible for the investigation. In carrying out this function, the Inspector General may... otherwise, shall be effected in accordance with any applicable laws, Executive orders, and regulations. ... RESPONSIBILITIES AND CONDUCT General Provisions § 19.735-107 Disciplinary and other remedial action. (a)...

  9. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    SciTech Connect

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

  10. 24 CFR 572.225 - Grant agreements; corrective and remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... under 2 CFR part 2424 with respect to future HOPE 3, HUD, or federal grant awards; and (vi) Taking any... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Grant agreements; corrective and remedial actions. 572.225 Section 572.225 Housing and Urban Development Regulations Relating to Housing...

  11. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Remedial and affirmative action and self-evaluation. 101-4.110 Section 101-4.110 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  12. 10 CFR 4.338 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Remedial and affirmative action by recipients. 4.338 Section 4.338 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM THE COMMISSION Regulations Implementing the Age Discrimination Act of 1975, as...

  13. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Remedial and affirmative action by recipients. 90.49 Section 90.49 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Investigation, Conciliation and...

  14. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Remedial and affirmative action and self-evaluation. 113.110 Section 113.110 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NONDISCRIMINATION IN FINANCIAL ASSISTANCE PROGRAMS OF SBA-EFFECTUATION OF POLICIES OF FEDERAL GOVERNMENT AND SBA ADMINISTRATOR...

  15. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Remedial and affirmative action and self-evaluation. 23.110 Section 23.110 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL...

  16. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Remedial and affirmative action and self-evaluation. 618.110 Section 618.110 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction...

  17. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Remedial and affirmative action and self-evaluation. 1317.110 Section 1317.110 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  18. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self-evaluation. 19.110 Section 19.110 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY GENERAL NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING...

  19. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Remedial and affirmative action and self-evaluation. 101-4.110 Section 101-4.110 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  20. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Remedial and affirmative action and self-evaluation. 23.110 Section 23.110 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL...