Science.gov

Sample records for action umtra program

  1. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  2. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  3. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  4. UMTRA Project Office Quality Assurance Program Plan. Revision 5

    SciTech Connect

    Not Available

    1993-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

  5. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    SciTech Connect

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project`s environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions.

  6. UMTRA Ground Water Project management action process document

    SciTech Connect

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  7. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  8. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  9. Project Charter (MSA-143). [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-07-01

    Public Law 95-604, The Uranium Mill Tailings Radiation Control Act of 1978'' as amended assigns to DOE, other Federal agencies, and involved States and Indian tribes, responsibilities for remedial actions at 22 inactive uranium mill tailings sites listed in the Act, and for any other sites designated by the Secretary prior to November 8, 1979. The objective of the UMTRA Project is to provide remedial action at the mill tailings sites and associated vicinity properties in order to stabilize and control the tailings in a safe and environmentally sound manner and to eliminate potential health hazards caused by residual levels of uranium decay products that exceed EPA standards. A total of 24 uranium mill tailings sites. This Project Charter delineates the respective responsibilities and authorities of (The Office of Nuclear Energy) (NE) and (Albuquerque Operations Office) (AL), and defines the terms and conditions for management of the UMTRA Project. Supplementary Project management documents which have been and are being developed pursuant to this Charter include a Project Plan (PP), a Project Management Plan (PMP) and other plans governing the accomplishment of the Project mission Evolution of the program will require updates of the Project Plan and Project Management Plan.

  10. UMTRA Project document control system manual

    SciTech Connect

    Not Available

    1994-09-01

    This manual defines the Project Document Control System (PDCS) operated by the US DOE Uranium Mill tailings Remedial Action (UMTRA) project Office. The purpose of the PDCS is to provide an active and continuing program for acquiring, controlling, retaining, retrieving, retiring and disposing of all UMTRA Project documents. The PDCS also provides guidance and coordination in transferring documents by various UMTRA Projection document control centers to a central location.

  11. Final report of the UMTRA independent technical review of TAC audit programs

    SciTech Connect

    Not Available

    1994-10-01

    This report details the findings of an Independent Technical Review (ITR) of practices and procedures for the Uranium Mill Tailings Remedial Action (UMTRA) Project audit program. The audit program is conducted by Jacobs Engineering Group Inc., the Technical Assistance Contractor (TAC) for the UMTRA Project. The purpose of the ITR was to ensure that the TAC audit program is effective and is conducted efficiently. The ITR was conducted from May 16-20, 1994. A review team observed audit practices in the field, reviewed the TAC audit program`s documentation, and discussed the program with TAC staff and management. The format of this report has been developed around EPA guidelines; they comprise most of the major section headings. Each section begins by identifying the criteria that the TAC program is measured against, then describing the approach used by the ITR team to measure each TAC audit program against the criteria. An assessment of each type of audit is then summarized for each component in the following order: Radiological audit summary; Health and safety audit summary; Environmental audit summary; Quality assurance audit summary.

  12. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  13. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  14. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  15. UMTRA Project Administrative Files Collection Records Management Program

    SciTech Connect

    Not Available

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

  16. The ultrasonic ranging and data system for radiological surveys in the UMTRA (Uranium Mill Tailings Remedial Action) Project

    SciTech Connect

    Little, C.A.; Berven, B.A.; Blair, M.S.; Dickerson, K.S.; Pickering, D.A.

    1988-01-01

    The Ultrasonic Ranging and Data System (USRADS) was developed to allow radiation exposure data and positional information to be collected, stored and analyzed in a more efficient manner than currently employed on the (Uranium Mill Tailings Remedial Action (UMTRA) project. USRADS is a portable unit which employs ultrasonics, radio frequency transmissions, and a personal computer. Operational experience indicates that the system results in increased information about the property with decreased data analysis and transcription effort and only slightly more field effort. 5 refs., 3 figs., 2 tabs.

  17. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  18. Special study on vegetative covers. [UMTRA Project

    SciTech Connect

    Not Available

    1988-11-01

    This report describes the findings of a special study on the use of vegetative covers to stabilize tailings piles for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The principal rationale for using plants would be to establish a dynamic system for controlling water balance. Specifically, vegetation would be used to intercept and transpire precipitation to the atmosphere, rather than allowing water to drain into the tailings and mobilize contaminants. This would facilitate compliance with groundwater standards proposed for the UMTRA Project by the Environmental Protection Agency. The goals of the study were to evaluate the feasibility of using vegetative covers on UMTRA Project piles, define the advantages and disadvantages of vegetative covers, and develop general guidelines for their use when such use seems reasonable. The principal method for the study was to analyze and apply to the UMTRA Project the results of research programs on vegetative covers at other US Department of Energy (DOE) waste management facilities. The study also relied upon observations made of existing stabilized piles at UMTRA Project sites where natural vegetation is growing on the rock-covered surfaces. Water balance and erosion models were also used to quantify the long-term performance of vegetative covers planned for the topslopes of stabilized piles at Grand Junction and Durango, Colorado, two UMTRA Project sites where the decision was made during the course of this special study to use vegetative covers. Elements in the design and construction of the vegetative covers at these two sites are discussed in the report, with explanations of the differing features that reflect differing environmental conditions. 28 refs., 18 figs., 9 tabs.

  19. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  20. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    SciTech Connect

    Not Available

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  1. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  2. UMTRA Project: Environment, Safety, and Health Plan

    SciTech Connect

    Not Available

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project`s ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors` evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations.

  3. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect

    Bachrach, A.; Hoopes, J.; Morycz, D. ); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. , Inc., Washington, DC ); Rice, G. )

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  4. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  5. UMTRA Project water sampling and analysis plan, Slick Rock, Colorado

    SciTech Connect

    Not Available

    1994-08-01

    This water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the proposed Burro Canyon disposal site near Slick Rock, Colorado for the upcoming year. It identifies and justifies the sampling locations, analytical parameters, and sampling frequencies. The WSAP bridges water quality characterization and data collection objectives for the surface remediation program (Subpart A) and the ground water compliance program (Subpart B) identified in 40 CFR Part 192 (1994).

  6. UMTRA project list of reportable occurrences

    SciTech Connect

    Not Available

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

  7. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    SciTech Connect

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site.

  8. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    SciTech Connect

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.

  9. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process.

  10. Programs for Urban Action.

    ERIC Educational Resources Information Center

    National Board of Young Men's Christian Associations, New York, NY.

    This booklet contains descriptions of 150 urban action programs being conducted by Young Men's Christian Associations throughout the United States. Planning principles are included to assist those who wish to adapt the programs to local situations: involvement of people in planning; use of local indigenous leadership; planning in collaboration…

  11. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  12. Geomembrane special study. [UMTRA Project

    SciTech Connect

    Not Available

    1988-07-01

    The objective of the Geomembrane Special Study was to asses the suitability of geomembranes in Uranium Mill Tailings Remedial Action (UMTRA) Project pile designs. Geomembranes, also called flexible membrane liners, are made of polymer resins and are thermoplastic materials. Part of the special study was to evaluate regulatory compliance and acceptability issues. This study was proposed because of the extensive use of geomembranes in hazardous waste site remedial actions and their accepted use in Resource Conservation and Recovery Act (RCRA) cells as both covers and liners to limit infiltration, or as part of leachate collection systems. This study has reviewed the recent geomembrane literature focusing on: (1) longevity; (2) performance; (3) constructibility; and (4) quality control/quality assurance considerations. In addition to these technical considerations, regulatory compliance and acceptability concerns were also evaluated. This report describes the results of the literature review, including correspondence with manufacturers, resin producers, experts in the field, and long-term major users. 12 refs., 2 tabs.

  13. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project

    SciTech Connect

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

  14. Guidance for UMTRA project surveillance and maintenance

    SciTech Connect

    1986-01-01

    The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

  15. Sampling errors associated with soil composites used to estimate mean Ra-226 concentrations at an UMTRA remedial-action site

    SciTech Connect

    Gilbert, R.O.; Baker, K.R.; Nelson, R.A.; Miller, R.H.; Miller, M.L.

    1987-07-01

    The decision whether to take additional remedial action (removal of soil) from regions contaminated by uranium mill tailings involves collecting 20 plugs of soil from each 10-m by 10-m plot in the region and analyzing a 500-g portion of the mixed soil for /sup 226/Ra. A soil sampling study was conducted in the windblown mill-tailings flood plain area at Shiprock, New Mexico, to evaluate whether reducing the number of soil plugs to 9 would have any appreciable impact on remedial-action decisions. The results of the Shiprock study are described and used in this paper to develop a simple model of the standard deviation of /sup 226/Ra measurements on composite samples formed from 21 or fewer plugs. This model is used to predict as a function of the number of soil plugs per composite, the percent accuracy with which the mean /sup 226/Ra concentration in surface soil can be estimated, and the probability of making incorrect remedial action decisions on the basis of statistical tests. 8 refs., 15 figs., 9 tabs.

  16. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    SciTech Connect

    Tucker, M.D.; Khan, M.A.

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended.

  17. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  18. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect

    Not Available

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  19. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  20. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    SciTech Connect

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site.

  1. UMTRA water sampling and analysis plan, Green River, Utah

    SciTech Connect

    Papusch, R.

    1993-12-01

    The purpose of this water sampling and analysis plan (WSAP) is to provide a basis for groundwater and surface water sampling at the Green River Uranium Mill Tailing Remedial Action (UMTRA) Project site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations.

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  3. Supplement to the UMTRA Project water sampling and analysis plan, Ambrosia Lake, New Mexico

    SciTech Connect

    1995-08-01

    The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is in McKinley County, New Mexico. As part of UMTRA surface remediation, residual radioactive materials were consolidated on the site in a disposal cell that was completed July 1995. The need for ground water monitoring was evaluated and found not to be necessary beyond the completion of the remedial action because the ground water in the uppermost aquifer is classified as limited use.

  4. COMMUNITY ACTION PROGRAMS REPORT.

    ERIC Educational Resources Information Center

    MACDOUGALL, MARY ANN

    SPECIAL PROGRAMS IN REMEDIAL READING, EARLY CHILDHOOD EDUCATION, SUMMER SCHOOL INSTRUCTION, AND SCHOOL-COMMUNITY COORDINATION ARE EVALUATED. ALTHOUGH THE REMEDIAL READING PROGRAM DID NOT ESTABLISH THE SUPERIORITY OF ANY PARTICULAR METHOD OF TEACHING, IT DEMONSTRATED THE VALUE OF HAVING A READING SPECIALIST ON THE SCHOOL STAFF. MOST 4-YEAR-OLD…

  5. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    SciTech Connect

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement.

  6. Uranium Mill Tailings Remedial Action Program. Annual status report

    SciTech Connect

    Not Available

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981.

  7. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  8. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  9. UMTRA project water sampling and analysis plan -- Shiprock, New Mexico

    SciTech Connect

    Not Available

    1994-02-01

    Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site.

  10. Moisture content and unsaturated conditions in UMTRA project radon barriers

    SciTech Connect

    Not Available

    1988-12-01

    A typical Uranium Mill Tailings Remedial Action (UMTRA) Project disposal facility consists of uranium tailings and other contaminated materials covered by a three to six foot thick radon barrier and six inches of filter sand, overlain by one foot of erosion-protection riprap. To comply with the proposed US Environmental Protection Agency groundwater protection standards applicable to the UMTRA Project, groundwater concentration limits of hazardous constitutents cannot be exceeded at the point of compliance, which is the downgradient limit of the waste management area. The typical radon barrier has a saturated hydraulic conductivity of approximately 1 {times} 10{sup {minus}7} centimeters per second (cm/s). Long-term seepage rates from a disposal facility with an unsaturated radon barrier may permit the concentration limits to be met at the point of compliance. Field studies were undertaken to measure the percent saturation and the relation of percent saturation to soil tension, and to predict the hydraulic conductivity as a function of percent saturation in radon barriers at three UMTRA Project disposal facilities that have been completed for up to two years. Presently typical covers have been completed at the Shiprock, Clive, and Burrell sites, and they are planned or under construction at the Ambrosia Lake, Green River, Lakeview, Mexican Hat, Slick Rock, and Tuba City sites. 2 refs., 13 figs., 1 tab.

  11. UMTRA project disposal cell cover biointrusion sensitivity assessment, Revision 1

    SciTech Connect

    1995-10-01

    This study provides an analysis of potential changes that may take place in a Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cell cover system as a result of plant biointrusion. Potential changes are evaluated by performing a sensitivity analysis of the relative impact of root penetrations on radon flux out of the cell cover and/or water infiltration into the cell cover. Data used in this analysis consist of existing information on vegetation growth on selected cell cover systems and information available from published studies and/or other available project research. Consistent with the scope of this paper, no new site-specific data were collected from UMTRA Project sites. Further, this paper does not focus on the issue of plant transport of radon gas or other contaminants out of the disposal cell cover though it is acknowledged that such transport has the potential to be a significant pathway for contaminants to reach the environment during portions of the design life of a disposal cell where plant growth occurs. Rather, this study was performed to evaluate the effects of physical penetration and soil drying caused by plant roots that have and are expected to continue to grow in UMTRA Project disposal cell covers. An understanding of the biological and related physical processes that take place within the cover systems of the UMTRA Project disposal cells helps the U.S. Department of Energy (DOE) determine if the presence of a plant community on these cells is detrimental, beneficial, or of mixed value in terms of the cover system`s designed function. Results of this investigation provide information relevant to the formulation of a vegetation control policy.

  12. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  13. UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1

    SciTech Connect

    1995-09-01

    Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

  14. Colorado economic impact study on the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-11-12

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1993. To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are: Direct employment was estimated at 894 workers; An estimated 89 percent of all direct employment was local; Secondary employment resulting from remedial action at the active Colorado UMTRA Project sites and the Grand Junction vicinity property program is estimated at 546 workers. Total employment (direct and secondary) is estimated at 1440 workers for the period of study (July 1, 1992, to June 30, 1993). An estimated $24.1 million was paid in wages to UMTRA workers in Colorado during FY1993; Direct and secondary wage earnings were estimated at $39.9 million; Income tax payments to the state of Colorado were estimated at $843,400 during FY1993; The gross economic impact of UMTRA Project activities in the state of Colorado is estimated at $70 million during the 1-year study period; and the net economic benefit to the state of Colorado was estimated at $57.5 million, or $5.90 per dollar of funding provided by Colorado. This figure includes both direct and secondary benefits but does not include the impact of alternative uses of the state funding.

  15. DOE`s approach to groundwater compliance on the UMTRA project

    SciTech Connect

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  16. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    SciTech Connect

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR {section} 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents.

  17. Lawrence Berkeley Laboratory Affirmative Action Program. Revised

    SciTech Connect

    1995-06-01

    The Lawrence Berkeley Laboratory`s Affirmative Action Program (AAP) serves as a working document that describes current policies, practices, and results in the area of affirmative action. It represents the Laboratory`s framework for an affirmative approach to increasing the representation of people of color and women in segments of our work force where they have been underrepresented and taking action to increase the employment of persons with disabilities and special disabled and Vietnam era veterans. The AAP describes the hierarchy of responsibility for Laboratory affirmative action, the mechanisms that exist for full Laboratory participation in the AAP, the policies and procedures governing recruitment at all levels, the Laboratory`s plan for monitoring, reporting, and evaluating affirmative action progress, and a description of special affirmative action programs and plans the Laboratory has used and will use in its efforts to increase the representation and retention of groups historically underrepresented in our work force.

  18. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  19. Library Programs. LSCA Programs: An Action Report.

    ERIC Educational Resources Information Center

    Office of Educational Research and Improvement (ED), Washington, DC.

    The seven narrative reports featured in this publication detail the accomplishments, in seven key areas, of State Grant Programs (Titles I, II, and III) funded by the Library Services and Construction Act (LSCA). These descriptions of state and local library activities, demonstrating how libraries are meeting a variety of users' needs, are: (1)…

  20. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho. Final report

    SciTech Connect

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  2. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    SciTech Connect

    Matthews, M.L. . Uranium Mill Tailings Remedial Action Project Office); Nagel, J. . Div. of Environmental Quality)

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  3. RCRA corrective action program guide (Interim)

    SciTech Connect

    Not Available

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  4. Supplement to the UMTRA project water sampling and analysis plan, Slick Rock, Colorado

    SciTech Connect

    1995-09-01

    The water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the Burro Canyon disposal site near Slick Rock, Colorado. The initial WSAP was finalized in August 1994 and will be completely revised in accordance with the WSAP guidance document (DOE, 1995) in late 1996. This version supplements the initial WSAP, reflects only minor changes in sampling that occurred in 1995, covers sampling scheduled for early 1996, and provides a preliminary projection of the next 5 years of sampling and monitoring activities. Once surface remedial action is completed at the former processing sites, additional and more detailed hydrogeologic characterization may be needed to develop the Ground Water Program conceptual ground water model and proposed compliance strategy. In addition, background ground water quality needs to be clearly defined to ensure that the baseline risk assessment accurately estimated risks from the contaminants of potential concern in contaminated ground water at the UC and NC sites.

  5. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  6. Elementary Career Intervention Programs: Social Action Initiatives

    ERIC Educational Resources Information Center

    Palladino Schultheiss, Donna E.

    2005-01-01

    This paper examines several conceptual frameworks that can inform elementary career intervention programming. Equity, social justice, and the development of intrinsic motivation are key concepts in the promotion of social action initiatives aimed at improving academic achievement and expanding future career options for all students. Early career…

  7. Environmental Educational Youth Action Task Program

    ERIC Educational Resources Information Center

    Ab Rahman, Nik Norulaini Nik; Omar, Fatehah Mohd; Kalia, Noorliza; Hasmi, Mohammad

    2008-01-01

    An educational environmental youth camp was held comprising of fifty one 16-year old secondary students and facilitated by volunteers from the university and Friends of the Earth, a non profit organization in Penang. A weekend camp on youth action task program was held at an isolated beach packed with activities that were structured towards…

  8. Service Learning: An Action Oriented Program Evaluation

    ERIC Educational Resources Information Center

    Kelley, George

    2013-01-01

    Service learning is an academic discipline that provides students with "hands-on" opportunities for developing skills in real-world, community-based projects that serve and benefit community members. This dissertation reflects an action-oriented process for improving the quality of the Service Learning Program at City University of…

  9. Site observational work plan for the UMTRA Project site at Falls City, Texas

    SciTech Connect

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

  10. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    SciTech Connect

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344.

  11. 36 CFR 72.11 - Action program components.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program components. The local government will submit an Action Program which documents the recreation... park and recreation system. The local government must develop the Action Program consistent with and... expressed in its comprehensive plans and other documents. The Action Program consists of two sections...

  12. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  13. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    SciTech Connect

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.

  14. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    SciTech Connect

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River.

  15. 48 CFR 422.804 - Affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs....

  16. 48 CFR 522.804 - Affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs....

  17. 48 CFR 922.804 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... Affirmative action programs....

  18. 48 CFR 522.804 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs....

  19. 48 CFR 1522.804 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs....

  20. 48 CFR 522.804 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs....

  1. 48 CFR 1422.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR....804 Affirmative action programs....

  2. 48 CFR 1422.804 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR....804 Affirmative action programs....

  3. 48 CFR 422.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs....

  4. 48 CFR 22.804 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs....

  5. 48 CFR 22.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs....

  6. 48 CFR 22.804 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs....

  7. 48 CFR 1422.804 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR....804 Affirmative action programs....

  8. 48 CFR 22.804 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs....

  9. 48 CFR 1522.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs....

  10. 48 CFR 922.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... Affirmative action programs....

  11. 48 CFR 922.804 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... Affirmative action programs....

  12. 48 CFR 422.804 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs....

  13. 48 CFR 22.804 - Affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs....

  14. 48 CFR 422.804 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs....

  15. 48 CFR 1522.804 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs....

  16. 48 CFR 522.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs....

  17. 48 CFR 422.804 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs....

  18. 48 CFR 522.804 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs....

  19. 48 CFR 1522.804 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs....

  20. 36 CFR 72.16 - Preliminary Action Program requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.16 Preliminary Action Program requirements. The following information must be submitted: (a) Evidence of...

  1. Active Sites Environmental Monitoring Program: Action levels

    SciTech Connect

    Ashwood, J.S.; Ashwood, T.L.

    1991-10-01

    The Active Sites Environmental Monitoring Program (ASEMP) was established at Oak Ridge National Laboratory to provide for early leak detection and to monitor performance of the active low-level waste disposal facilities in Solid Waste Storage Area (SWSA) 6 and the transuranic waste storage areas in SWSA 5 North. Early leak detection is accomplished by sampling runoff, groundwater, and perched water in burial trenches. Sample results are compared to action levels that represent background contamination by naturally occurring and fallout-derived radionuclides. 15 refs., 3 figs., 12 tabs.

  2. 36 CFR 72.15 - Preliminary Action Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) copies of the Preliminary Action Program. (Sec. 1007(a) and (b) of Title X National Parks and Recreation... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Preliminary Action Program... INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.15...

  3. 36 CFR 72.15 - Preliminary Action Program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) copies of the Preliminary Action Program. (Sec. 1007(a) and (b) of Title X National Parks and Recreation... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Preliminary Action Program... INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.15...

  4. 36 CFR 72.15 - Preliminary Action Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) copies of the Preliminary Action Program. (Sec. 1007(a) and (b) of Title X National Parks and Recreation... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Preliminary Action Program... INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.15...

  5. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect

    Not Available

    1985-12-01

    FY 1985 project accomplishments include: completed 90% of the processing site remedial actions at Canonsburg, Pennsylvania, and initiated remedial actions at Salt Lake City, Utah, and Shiprock, New Mexico; awarded remedial action contracts on 329 vicinity properties at seven designated locations and completed survey and inclusion activities on a total of 1620 vicinity properties; published the Environmental Assessment (EA) for Lakeview, Oregon, issued the draft and prepared the final Environmental Impact Statement (EIS) for Durango, Colorado; completed the Remedial Action Plan (RAP) for Lakeview, Oregon, and prepared the draft RAP for Durango, Colorado; executed cooperative agreements with Idaho, New Mexico, and the Navajo Nation/Hopi Tribe; executed a Memorandum of Understanding with the Nuclear Regulatory Commission; and developed proposed UMTRA Project design review criteria between DOE and the NRC.

  6. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    SciTech Connect

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC {section}7901 et seq.) and the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts.

  7. Hanford Tank Farm RCRA Corrective Action Program

    SciTech Connect

    Kristofzski, J.R.; Mann, F.M.; Anderson, F.J.; Lober, R.W.

    2007-07-01

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the U.S. Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: - Characterize the distribution and extent of the existing vadose zone contamination; - Determine how the contamination will move in the future; - Estimate the impacts of this contamination on groundwater and other media; - Develop and implement mitigative measures; - Develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper. (authors)

  8. Action Research in EdD Programs in Educational Leadership

    ERIC Educational Resources Information Center

    Osterman, Karen; Furman, Gail; Sernak, Kathleen

    2014-01-01

    This exploratory study gathered information about the use of action research within doctor of education programs in educational leadership and explored faculty understanding of and perspectives on action research. Survey data established that action research is used infrequently to meet dissertation requirements. Contributing factors include lack…

  9. 36 CFR 72.11 - Action program components.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action program components. 72.11 Section 72.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.11...

  10. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  11. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  12. Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado

    SciTech Connect

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Maybell (DOE, 1994a). Further, this supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Maybell. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1994) and 60 CFR 2854 (1 995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Maybell site are the Maybell Baseline Risk Assessment (currently in progress), the Maybell Remedial Action Plan (RAP) (DOE, 1994b), and the Maybell Environmental Assessment (DOE, 1995).

  13. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  14. Technology Education in Action: Outstanding Programs.

    ERIC Educational Resources Information Center

    International Technology Education Association, Reston, VA.

    This volume contains 10 articles describing middle school and high school technology education programs conducted in schools throughout the United States. Program descriptions, which are written by the teachers involved in the programs, are from schools in the following areas: Ann Arbor, Michigan; Chicago, Illinois; Pittsburg, Kansas; Salt Lake…

  15. Affirmative Action Compliance Program for Fiscal Year 1980

    SciTech Connect

    Not Available

    1980-01-01

    Eleven chapters are used to delineate Lawrence Berkeley Lab's compliance, namely: (1) a description of LBL's facility, history, staff, mission, etc; (2) Affirmative Action policy statement; (3) dissemination (internal and external) per the implementation regulations; (4) identification of Affirmative Action responsibilities; (5) personnel policies; (6) past goal-setting process and accomplishment; (7) work-force array, job groups, availability determinations, identification of underutilization, and goals and timetables; (8) identification of problem areas and action-oriented programs; (9) listing and brief description of specific LBL Affirmative Action programs; (10) compliance with sex-discrimination guidelines; and (11) compliance with guidelines on discrimination because of religion or national origin.

  16. Affirmative Action Programs: A Current Perspective.

    ERIC Educational Resources Information Center

    Muhammad, Habibah P.

    Recent lawsuits and judgments brought against colleges and universities for enacting affirmative action policies are threatening to dismantle the core principles of the Bakke decision (Regents of the University of California v. Bakke) and undermine the Civil Rights Act of 1964. This paper discusses current issues and challenges that pertain to…

  17. Affirmative Action Training Program for Firemen.

    ERIC Educational Resources Information Center

    MacBain, Z. E.

    This paper summarizes the "Affirmative Action" training of unskilled minorities for jobs as firemen. The various training approaches undertaken are discussed; some were more successful than others. Hopefully, the information provided in this report can be used by other fire departments as a basis for developing their own minority "Affirmative…

  18. Action Implications in Adult Basic Education Programs.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus.

    Eight articles on adult basic education are presented. The articles adapted from 1971 workshop presentations are: Action Implications for ABE Directors by Alan Knox; ABE Budget Development, by Donald G. Butcher; Competent ABE Instructors, by William D. Dowling; Interview Techniques and Training, by Norman Kagan; Reading: The Basic in Adult Basic…

  19. Action Research: Effective Marketing Strategies for a Blended University Program

    ERIC Educational Resources Information Center

    Cook, Ruth Gannon; Ley, Kathryn

    2008-01-01

    This action research study investigated a marketing plan based on collaboration among a program faculty team and other organizational units for a graduate professional program. From its inception through the second year of operation, program enrollment increased due to the marketing plan based on an effective approach grounded in simple marketing…

  20. The Windana Therapeutic Community's Action Adventure Program.

    ERIC Educational Resources Information Center

    Price, Richard; DeBever, Marijke

    The Windana Society is a drug and alcohol agency in Victoria (Australia) that operates, among other things, a residential drug rehabilitation program in a rural setting. The program utilizes a holistic approach that addresses health and physical fitness; education; vocational and re-integration support; and psychological, emotional, spiritual, and…

  1. Supplement to the UMTRA Project water sampling and analysis plan, Riverton, Wyoming

    SciTech Connect

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project`s present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b).

  2. Status of the ground water flow model for the UMTRA Project, Shiprock, New Mexico, site

    SciTech Connect

    Not Available

    1995-01-01

    A two-dimensional numerical model was constructed for the alluvial aquifer in the area of the Uranium Mill Tailings Remedial Action (UMTRA) Project Shiprock, New Mexico, site. This model was used to investigate the effects of various hydrologic parameters on the evolution of the ground water flow field. Results of the model are useful for defining uncertainties in the site conceptual model and suggesting data collection efforts to reduce these uncertainties. The computer code MODFLOW was used to simulate the two-dimensional flow of ground water in the alluvium. The escarpment was represented as a no-flow boundary. The San Juan River was represented with the MODFLOW river package. A uniform hydraulic conductivity distribution with the value estimated by the UMTRA Project Technical Assistance Contractor (TAC) and a uniform recharge distribution was used. Infiltration from the flowing artesian well was represented using the well package. The ground water flow model was calibrated to ground water levels observed in April 1993. Inspection of hydrographs shows that these levels are representative of typical conditions at the site.

  3. Supplement to the UMTRA Project water sampling and analysis plan, Mexican Hat, Utah

    SciTech Connect

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Mexican Hat (DOE, 1994). Further, the supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Mexican Hat. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1991) and 60 FR 2854 (1995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Mexican Hat site are the Mexican Hat Long-Term Surveillance Plan (currently in progress), and the Mexican Hat Site Observational Work Plan (currently in progress).

  4. Technical approach for the management of UMTRA ground water investigation-derived wastes

    SciTech Connect

    Not Available

    1994-02-01

    During characterization, remediation, or monitoring activities of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project, ground water samples are collected to assess the extent and amount of waterborne contamination that might have come from the mill tailings. This sampling sometimes occurs in contaminated areas where ground water quality has been degraded. Ground water sampling activities may result in field-generated wastes that must be disposed of in a manner protective of human health and the environment. During ground water sampling, appropriate measures must be taken to dispose of presampling purge water and well development water that is pumped to flush out any newly constructed wells. Additionally, pumping tests may produce thousands of gallons of potentially contaminated ground water that must be properly managed. In addition to the liquid wastes, there is the potential for bringing contaminated soils to the ground surface during the drilling and installation of water wells in areas where the subsurface soils may be contaminated. These soils must be properly managed as well. This paper addresses the general technical approach that the UMTRA Project will follow in managing field-generated wastes from well drilling, development, sampling, and testing. It will provide guidance for the preparation of Technical Assistance Contractor (TAC) Standard Operating Procedures (SOP) for the management and disposal of field-generated wastes from ground water monitoring and remediation activities.

  5. Evaluation of the cover cracking potential due to ground subsidence at UMTRA Project disposal cells

    SciTech Connect

    Claire, R.F.; Kuo, J.C.; Wanket, D.R.

    1994-03-01

    The US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project requires that mill tailings, containing low-level radioactive uranium mill tailings and other waste, be stabilized and controlled by placement in an encapsulated disposal cell. The cover of the cell is a multi-layer system which includes a low-permeability earthen radon/infiltration barrier, a bedding layer, and a erosion protection layer. The radon/infiltration barrier is designed to limit the radon flux and reduce water infiltration. The performance criteria established by the US Environmental Protection Agency in 40 CFR 192 require the cover to be effective for up to 1000 years to the extent reasonably achievable, and in any case, for at least 200 years. One concern that would affect the integrity of the radon/infiltration barrier is the potential for cracking due to the post-construction settlement of underlying compressible materials. To investigate the potential of cover cracking for UMTRA disposal cells, a simplified beam analysis is used to determine the horizontal movements and strains due to the differential settlements at the top surface of a relatively incompressible layer (e.g. radon/infiltration barrier and compacted tailings). The potential of cover cracking is then evaluated by comparing the calculated horizontal tensile strains with the strains that will cause cracking of the cover for a given material.

  6. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    SciTech Connect

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS).

  7. Science in action: An interdisciplinary science education program

    NASA Technical Reports Server (NTRS)

    Horton, Linda L.

    1992-01-01

    Science in Action is an education outreach program for pre-collegiate students. It is based on the concept that, in order to interest students in science, they must see science and scientists at work. The program encompasses the full range of scientific disciplines - the core sciences, engineering, and mathematics. A unique aspect of the program is the involvement and support of scientists and engineers representing local professional societies, industries, business, and academic institutions. An outline of the program is given.

  8. Cancer survivorship programs: time for concerted action.

    PubMed

    Barbui, Tiziano; Björkholm, Magnus; Gratwohl, Alois

    2014-08-01

    Hematologists, specialists in cancer survivorship and patient advocates met in Bergamo, Italy (Nov 14–16, 2013) to highlight the physical, mental, psychosocial and financial challenges faced by cancer survivors and their families. Gaps in research and resources were all too apparent. This planned meeting perspective, not a formal consensus statement, reflects the key points mentioned by the participants during the discussions and the personal view of the authors. It proposes urgent action in key areas to ensure that people surviving cancer will suffer fewer long-term health problems than their predecessors and to contain costs. PMID:25082784

  9. Columbia University Affirmative Action Program (Condensed Version).

    ERIC Educational Resources Information Center

    Columbia Univ., New York, NY.

    Columbia University's equal employment opportunity policy is reviewed in relation to officers of instruction and research, officers of administration and support staff, and procedures and programs. Part I reaffirms the policy, indicates dissemination of the policy and reviews the responsibility for implementation of the policy. The officers of…

  10. EDUCATIONAL OPPORTUNITIES PROVIDED BY COMMUNITY ACTION PROGRAMS.

    ERIC Educational Resources Information Center

    PINNOCK, THEODORE J.

    INFORMAL EDUCATION PRIMARILY INCLUDES EDUCATION FOR EVERYDAY EFFECTIVE LIVING AND DOES NOT NECESSARILY HAVE TO INCLUDE COURSES FOR CREDIT AT THE HIGH SCHOOL AND COLLEGE LEVELS. MILLIONS OF POVERTY STRICKEN PEOPLE CAN BENEFIT FROM THE TYPE OF INFORMAL EDUCATION PROVIDED THROUGH THE OFFICE OF ECONOMIC OPPORTUNITY (OEO) IN SUCH PROGRAMS AS--(1) THE…

  11. The GLOBE Program: Partnerships in Action

    NASA Astrophysics Data System (ADS)

    Henderson, S.; Kennedy, T.; Lemone, M.; Blurton, C.

    2004-12-01

    The GLOBE Program is a worldwide science and education partnership endeavor designed to increase scientific understanding of Earth as a system, support improved student achievement in science and math, and enhance environmental awareness through inquiry-based learning activities. GLOBE began on the premise that teachers and their students would partner with scientists to collect and analyze environmental data using specific protocols in five study areas - atmosphere, soils, hydrology, land cover, and phenology. As the GLOBE network grew, additional partnerships flourished making GLOBE an unprecedented collaboration of individuals worldwide - primary, secondary, and tertiary students, teachers and teacher educators, scientists, government officials, and others - to improve K-12 education. Since its inception in 1994, more than one million students in over 14,000 schools around the world have taken part in The GLOBE Program. The GLOBE Web site (http://www.globe.gov) is the repository for over 11 million student-collected data measurements easily accessible to students and scientists worldwide. Utilizing the advantages of the Internet for information sharing and communication, GLOBE has created an international community. GLOBE enriches students by giving them the knowledge and skills that they will need to become informed citizens and responsible decision-makers in an increasingly complex world. Understanding that all members of a community must support change if it is to be sustainable, GLOBE actively encourages the development of GLOBE Learning Communities (GLCs) which are designed to get diverse stakeholder groups involved in a local or regional environmental issue. Central to the GLC is the engagement of local schools. GLCs go beyond individual teachers implementing GLOBE in the isolation of their classrooms. Instead, the GLC brings multiple teachers and grade levels together to examine environmental issues encouraging the participation of a broad range of

  12. 48 CFR 1522.804 - Affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity...

  13. 40 CFR 192.33 - Corrective action programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Corrective action programs. 192.33 Section 192.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) RADIATION PROTECTION PROGRAMS HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS Standards...

  14. 40 CFR 192.33 - Corrective action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Corrective action programs. 192.33 Section 192.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) RADIATION PROTECTION PROGRAMS HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS Standards...

  15. 48 CFR 1422.804 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity...

  16. 48 CFR 922.804 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITION Equal Employment Opportunity...

  17. 48 CFR 922.804 - Affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITION Equal Employment Opportunity...

  18. 48 CFR 1422.804 - Affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity...

  19. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  20. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    SciTech Connect

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

  1. Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico

    SciTech Connect

    Not Available

    1994-09-01

    The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ``limited use.``

  2. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    SciTech Connect

    1996-01-23

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch{reg_sign}) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch{reg_sign} and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points.

  3. Library Programs. LSCA Programs: An Action Report II.

    ERIC Educational Resources Information Center

    Office of Educational Research and Improvement (ED), Washington, DC.

    The eight reports featured in this publication detail the accomplishments of the State Grant Program (Titles I through IV) funded by the Library Services and Construction Act (LSCA). Written by members of the Public Library Support Staff, these descriptions are based on state and local library reports on how they meet a variety of users' needs.…

  4. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include...

  5. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include...

  6. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include...

  7. 41 CFR 60-2.10 - General purpose and contents of affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contents of affirmative action programs. 60-2.10 Section 60-2.10 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 2-AFFIRMATIVE ACTION PROGRAMS Purpose and Contents of Affirmative Action Programs § 60-2.10 General purpose and contents of affirmative action programs. (a) Purpose....

  8. 41 CFR 60-741.46 - Voluntary affirmative action programs for employees with disabilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS, EQUAL EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION... Action Program § 60-741.46 Voluntary affirmative action programs for employees with disabilities. (a) The... contractor elects to implement a voluntary affirmative action program for employees with disabilities,...

  9. A Format for Packaging Your Affirmative Action Program.

    ERIC Educational Resources Information Center

    Brookmire, David A.; Burton, Amy A.

    1978-01-01

    In order to standardize procedures for corporate affirmative action programs (AAP) in compliance with all of the diverse federal legislation and regulations, the authors present an AAP manual format which has been approved by each interested federal agency and by the Office of Federal Contracts Compliance. (MF)

  10. 41 CFR 60-1.40 - Affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Affirmative action programs. 60-1.40 Section 60-1.40 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.40...

  11. 41 CFR 60-1.40 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action programs. 60-1.40 Section 60-1.40 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.40...

  12. 41 CFR 60-1.40 - Affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Affirmative action programs. 60-1.40 Section 60-1.40 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.40...

  13. 41 CFR 60-1.40 - Affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Affirmative action programs. 60-1.40 Section 60-1.40 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.40...

  14. Affirmative Action Education Programs for Siberian Native People.

    ERIC Educational Resources Information Center

    Bartels, Dennis; Bartels, Alice

    1984-01-01

    Describes origin and development of programs, focusing on affirmative action at the Faculty of Northern Peoples of Leningrad's Herzen Pedagogical Institute. Offers conclusions and implications for North America. Includes extensive bibliography, tables on Siberian populations and languages, and biographies of two Siberian educators and two female…

  15. A Participatory Action Research Approach To Evaluating Inclusive School Programs.

    ERIC Educational Resources Information Center

    Dymond, Stacy K.

    2001-01-01

    This article proposes a model for evaluating inclusive schools. Key elements of the model are inclusion of stakeholders in the evaluation process through a participatory action research approach, analysis of program processes and outcomes, use of multiple methods and measures, and obtaining perceptions from diverse stakeholder groups. (Contains…

  16. The FCEOC Library: A Community Action Program. Operations Manual.

    ERIC Educational Resources Information Center

    Scott, R. E.

    The Fresno County (California) Economic Opportunities Commission (FCEOC) library produced this policy, procedures, and use manual as a guide for community action programs. The manual includes information on structure and use of the card catalog, organization of materials, use and organization of the vertical file, organization of grant research…

  17. 36 CFR 72.15 - Preliminary Action Program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....11, 72.12 and 72.13 may be satisfied by local governments' submission of a Preliminary Action Program... Act of 1978, Pub. L. 95-625, (16 U.S.C. 2506); sec. 2 of Reorganization Plan No. 3 of 1950 (34...

  18. In situ testing to determination field-saturated hydraulic conductivity of UMTRA Project disposal cell covers, liners, and foundation areas. Special study

    SciTech Connect

    Not Available

    1994-02-01

    This special study was conducted to prepare a guidance document for selecting in situ hydraulic conductivity (K) tests, comparing in situ testing methods, and evaluating the results of such tests. This report may be used as a practical decision-making tool by the Uranium Mill Tailings Remedial Action (UMTRA) Project staff to determine which testing method will most efficiently achieve the field-saturated K results needed for long-term planning. A detailed section on near-surface test methods discusses each method which may be applicable to characterization of UMTRA disposal cell covers, liners and foundation materials. These potentially applicable test methods include the sealed double-ring infiltrometer (SDRI), the air-entry permeameter (AEP), the guelph permeameter, the two-stage borehole technique (TSB), the pressure infiltrometer, and the disk permeameter. Analytical solutions for these methods are provided, and limitations of these solutions are discussed, and a description of testing equipment design and installation are provided.

  19. Work plan for monitor well installation water and sediment sample collection aquifer testing and topographic surveying at the Riverton, Wyoming, UMTRA Project Site

    SciTech Connect

    1995-06-01

    Investigations conducted during preparation of the site observational work plan (SOWP) at the Uranium Mill Tailings Remedial Action (UMTRA) Project site support a proposed natural flushing ground water compliance strategy, with institutional controls. However, additional site-specific data are needed to reduce uncertainties in order to confirm the applicability and feasibility of this proposed compliance strategy option. This proposed strategy will be analyzed in the site-specific environmental assessment. The purpose of this work plan is to summarize the data collection objectives to fill those data needs, describe the data collection activities that will be undertaken to meet those objectives, and elaborate on the data quality objectives which define the procedures that will be followed to ensure that the quality of these data meet UMTRA Project needs.

  20. Design of UMTRA covers to mitigate the effect of frost penetration

    SciTech Connect

    Banani, A.M.; Claire, R.F.

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project, contracted by the US Department of Energy (DOE), requires construction of disposal cells for residual radioactive materials from abandoned uranium mill tailings. A disposal cell consists of contaminated material placed within a stabilized embankment with a top cover. The embankment and cover should be effective for up to 1000 years, to the extent reasonably achievable, and in any case for at least 200 years. The embankment cover usually consists of a radon/infiltration barrier, a frost barrier and erosion protection layer consisting of bedding and riprap layers. The radon/infiltration barrier and frost barrier are two important elements of the cover systems. A radon/infiltration barrier is designed to reduce the radon emissions from the contaminated materials and to limit the surface water infiltration into the contaminated material. However, a radon/infiltration barrier has to be protected from repeated freeze-thaw cycles to prevent an increase in permeability. Frost penetration depth is site specific and depends on local climatic conditions and soil properties of the cover system. However, placing a frost barrier is not only very costly but also reduces the disposal capacity of the embankment. Recent laboratory test results indicate that freeze-thaw cycles do not significantly effect the permeability of compacted sand-bentonite mixtures. Therefore, radon/infiltration barriers using sand-bentonite mixtures may not require frost barriers for protection against the effects of freeze-thaw. In this paper the design of UMTRA covers is briefly explained; the criteria to determine a 200 year freeze event, and the frost penetration depth are discussed. The results of freeze-thaw permeability tests on compacted clay and sand-bentonite mixtures are also presented.

  1. Current activities handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-27

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  2. Hazardous Waste Remedial Actions Program annual progress report, FY 1990

    SciTech Connect

    Not Available

    1990-12-01

    The Hazardous Waste Remedial Actions Programs (HAZWRAP), a unit of Martin Marietta Energy Systems, Inc., supports the Department of Energy (DOE) Oak Ridge Operations Office in broadly environmental areas, especially those relating to waste management and environmental restoration. HAZWRAP comprises six program areas, which are supported by central administrative and technical organizations. Existing programs deal with airborne hazardous substances, pollution prevention, remedial actions planning, environmental restoration, technology development, and information and data systems. HAZWRAP's mission to develop, promote, and apply-cost-effective hazardous waste management and environmental technologies to help solve national problems and concerns. HAZWRAP seeks to serve as integrator for hazardous waste and materials management across the federal government. It applies the unique combination of research and development (R D) capabilities, technologies, management expertise, and facilities in the Energy Systems complex to address problems of national importance. 24 figs., 10 tabs.

  3. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    SciTech Connect

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.

  4. Optimizing Canadian public immunization programs: a prescription for action.

    PubMed

    Scheifele, David W; Naus, Monika; Crowcroft, Natasha S; Dobson, Simon; Halperin, Scott A; Bjornson, Gordean

    2011-01-01

    Recent expansion of public vaccination programs for children and youth offers new health benefits but at substantially increased cost. As with other large public investments, immunization programs ought to be systematically evaluated for safety, effectiveness and economic value. At present, program evaluations are suboptimal in most provinces and territories. Experts in public health and vaccinology who attended a workshop in 2009 reviewed the shortcomings and produced "prescriptions for action" to improve matters. Six key recommendations were made: 1) a formal requirement should exist to evaluate all public vaccination programs appropriately; 2) greater voluntary harmonization of programs will facilitate evaluations; 3) a mechanism is needed to prioritize and coordinate program-specific evaluations; 4) new funding mechanisms are needed for basic jurisdictional studies and joint studies of broad relevance; 5) strong emphasis is needed on capacity development and training; and 6) administrative barriers to accessing health information systems and publishing evaluation studies need to be overcome. The expert group considered the need to improve program evaluations as urgent and compelling, with success achievable with dedicated funding and effective leadership. Demonstrating that Canadian immunization programs are among the world's best and safest is a sound strategy for maintaining public participation in those programs.

  5. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  6. Ohio state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    Not Available

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  7. Oregon state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  8. Florida state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  9. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  10. Maryland State information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  11. California state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  12. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  13. Oregon state information handbook formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  14. Expedited Remedial Action Program (SB 923): A California Brownfields initiative

    SciTech Connect

    Cambridge, M.; Wolfenden, A.K.

    1996-12-31

    California`s Expedited Remedial Action Program (ERAP) created a comprehensive program that promotes an equitable and expedited approach for redevelopment of properties contaminated with hazardous substances. This bill embodies an emerging trend in environmental policy that permits flexibility, cooperation and creativity without compromising protection to public health or the environment. Within the California Environmental Protection Agency, the Department of Toxic Substances Control (DTSC) is promoting a number of programs to facilitate the restoration of contaminated properties as part of its Brownfields initiative. ERAP represents a potentially more efficient process to remediate sites by minimizing economic risks through a clearly identified liability scheme, indemnifying future owners through a covenant not to sue, and providing risk based cleanups that are based on the permanent use of the site.

  15. Science in Action'': An interdisciplinary science education program

    SciTech Connect

    Horton, L.L.

    1991-01-01

    Science in Action is an education outreach program for pre-collegiate students. It is based on the concept that, in order to interest students in science, they must see science and scientists at work. The program encompasses the full range of scientific disciplines -- the core sciences, engineering and mathematics. A unique aspect of the program is the involvement and support of scientists and engineers representing local professional societies, industries, businesses, and academic institutions. The goal of the presentations is to be highly interactive. The students have some hands on'' experiences and leave with a good feeling about science and engineering. To present a broad spectrum of role models, scientists and engineers were involved as presenters, guides, and exhibitors.

  16. Missouri State information handbook: formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  17. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  18. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    SciTech Connect

    Not Available

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year.

  19. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  20. Risk assessment in the DOE Assurance Program for Remedial Action

    SciTech Connect

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

  1. Entrepreneurial Learning through Action: A Case Study of the Six-Squared Program

    ERIC Educational Resources Information Center

    Pittaway, Luke; Missing, Caroline; Hudson, Nigel; Maragh, Dean

    2009-01-01

    This paper explores the role of "action" in entrepreneurial learning and illustrates how programs designed to support action learning can enhance management development in entrepreneurial businesses. The paper begins by exploring action learning and the way "action" is conceived in different types of program. In the second part, the paper details…

  2. UMTRA Project water sampling and analysis plan, Gunnison, Colorado: Revision 1

    SciTech Connect

    Not Available

    1994-11-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for future water sampling activities, in accordance with the Guidance Document for Preparing Sampling and Analysis Plans for UMTRA Sites. A buffer zone monitoring plan for the Dos Rios Subdivision is included as an appendix. The buffer zone monitoring plan was developed to ensure continued protection to the public from residual contamination. The buffer zone is beyond the area depicted as contaminated ground water due to former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually at the Gunnison processing site and disposal site. Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation.

  3. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    SciTech Connect

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  4. From science to action and from action to science: the Nunavik Trichinellosis Prevention Program

    PubMed Central

    Larrat, Sylvain; Simard, Manon; Lair, Stéphane; Bélanger, Denise; Proulx, Jean-François

    2012-01-01

    Objectives During the 1980s, walrus-meat consumption caused infections with the parasite Trichinella nativa in Nunavik inhabitants. In response to these events, stakeholders set up the community-based Nunavik Trichinellosis Prevention Program (NTPP). The objectives of the present communication are to review the NTPP, describe how science and action were interwoven in its development and identify its assets and limitations. Study design Descriptive study. Methods The NTPP relies on a pooled digestion assay of tongue samples taken from each harvested walrus. The public health recommendations depend on the results of the analyses: infected walrus meat should be destroyed; parasite-free meat may be eaten raw or cooked. Results All communities involved in the walrus hunt participate in the NTPP and a high percentage of harvested walruses are included in the NTPP. Infected animals account for 2.9% of the walruses tested (20/694) since 1992. The NTPP permitted the early management of a trichinellosis event in 1997. Since then, it prevented the new occurrence of outbreaks related to walruses hunted by Nunavimmiut. Conclusions The absence of recent major outbreaks of trichinellosis in Nunavik may reasonably be attributed to the NTPP. The success of the program stands on many facilitating factors such as the nature of the disease and its source, the existence of an efficient analytic method, the strong involvement of the different partners including direct resource users, as well as the comprehensive bidirectional science-to-action approach that has been followed. PMID:22789519

  5. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect

    Not Available

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  6. A Three Step Plan for Implementing an Affirmative Action Program

    ERIC Educational Resources Information Center

    Hilaael, Timothy M.

    1976-01-01

    (1) Centralize organizational responsibility for affirmative action. (2) Conduct an organizational audit related to the Equal Employment Opportunity Act. (3) Implement affirmative action as an administrative responsibility. (Author)

  7. UMTRA project water sampling and analysis plan, Ambrosia Lake, New Mexico

    SciTech Connect

    Not Available

    1994-02-01

    This water sampling and analysis plan (WSAP) provides the basis for ground water sampling at the Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site during fiscal year 1994. It identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations and will be updated annually. The Ambrosia Lake site is in McKinley County, New Mexico, about 40 kilometers (km) (25 miles [mi]) north of Grants, New Mexico, and 1.6 km (1 mi) east of New Mexico Highway 509 (Figure 1.1). The town closest to the tailings pile is San Mateo, about 16 km ( 10 mi) southeast (Figure 1.2). The former mill and tailings pile are in Section 28, and two holding ponds are in Section 33, Township 14 North, Range 9 West. The site is shown on the US Geological Survey (USGS) map (USGS, 1980). The site is approximately 2100 meters (m) (7000 feet [ft]) above sea level.

  8. 42 CFR 431.820 - Corrective action under the MEQC program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS STATE ORGANIZATION AND GENERAL ADMINISTRATION Quality... program. The agency must— (a) Take action to correct any active or negative case action errors found in the sample cases; (b) Take administrative action to prevent or reduce the incidence of those...

  9. 42 CFR 431.820 - Corrective action under the MEQC program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS STATE ORGANIZATION AND GENERAL ADMINISTRATION Quality... program. The agency must— (a) Take action to correct any active or negative case action errors found in the sample cases; (b) Take administrative action to prevent or reduce the incidence of those...

  10. 42 CFR 431.820 - Corrective action under the MEQC program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS STATE ORGANIZATION AND GENERAL ADMINISTRATION Quality... program. The agency must— (a) Take action to correct any active or negative case action errors found in the sample cases; (b) Take administrative action to prevent or reduce the incidence of those...

  11. 41 CFR 60-741.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.41 Availability...

  12. 41 CFR 60-250.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action program requirement. 60-250.40 Section 60-250.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF... SEPARATED VETERANS, AND OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.40 Applicability of...

  13. 41 CFR 60-250.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action program. 60-250.41 Section 60-250.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.41 Availability of affirmative...

  14. 41 CFR 60-741.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action program requirement. 60-741.40 Section 60-741.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program §...

  15. 41 CFR 60-300.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... affirmative action program. 60-300.41 Section 60-300.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF FEDERAL... OR CAMPAIGN BADGE VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action Program §...

  16. 41 CFR 60-300.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action program requirement. 60-300.40 Section 60-300.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF... VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.40 Applicability...

  17. 41 CFR 60-250.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action program requirement. 60-250.40 Section 60-250.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF... SEPARATED VETERANS, AND OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.40 Applicability of...

  18. 41 CFR 60-250.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action program requirement. 60-250.40 Section 60-250.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF... SEPARATED VETERANS, AND OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.40 Applicability of...

  19. 41 CFR 60-250.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action program. 60-250.41 Section 60-250.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.41 Availability of affirmative...

  20. 41 CFR 60-741.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program §...

  1. 41 CFR 60-741.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action program requirement. 60-741.40 Section 60-741.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program §...

  2. 41 CFR 60-300.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action program. 60-300.41 Section 60-300.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.41 Availability of affirmative...

  3. 41 CFR 60-300.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action program requirement. 60-300.40 Section 60-300.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF... VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.40 Applicability...

  4. 41 CFR 60-300.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action program. 60-300.41 Section 60-300.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.41 Availability of affirmative...

  5. 41 CFR 60-250.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action program. 60-250.41 Section 60-250.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.41 Availability of affirmative...

  6. 41 CFR 60-741.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affirmative action program requirement. 60-741.40 Section 60-741.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program §...

  7. 41 CFR 60-741.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action program requirement. 60-741.40 Section 60-741.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program §...

  8. 41 CFR 60-741.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.41 Availability...

  9. 41 CFR 60-250.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affirmative action program. 60-250.41 Section 60-250.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.41 Availability of affirmative...

  10. 41 CFR 60-300.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affirmative action program. 60-300.41 Section 60-300.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.41 Availability of affirmative...

  11. 41 CFR 60-741.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.41 Availability...

  12. 41 CFR 60-300.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action program. 60-300.41 Section 60-300.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.41 Availability of affirmative...

  13. 41 CFR 60-741.41 - Availability of affirmative action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.41 Availability...

  14. 41 CFR 60-300.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action program requirement. 60-300.40 Section 60-300.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF... VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.40 Applicability...

  15. Site observational work plan for the UMTRA project site at Falls City, Texas

    SciTech Connect

    Not Available

    1994-09-01

    During surface remedial action, an estimated 7.0 million tons (6.4 million tonnes) of uranium mill tailings and other contaminated materials were consolidated and stabilized on the Falls City site. The ground water protection strategy at the Falls City disposal site for the UMTRA Surface Project (Subpart A of 40 CFR Part 192 (1994)) was an application for supplemental standards, based on Class III (limited use) ground water in the uppermost aquifer. This water is not a current or potential source of drinking water. Ground water from the uppermost aquifer (ground water from the Deweesville/Conquista Members and the Dilworth Member) contains widespread ambient contamination resulting from naturally occurring conditions and from the effects of human activity not related to uranium milling operations (uranium exploration and mining activities). The ground water cannot be effectively cleaned up for drinking or other beneficial purposes using treatment methods reasonably employed by public water supply systems. The U.S. Nuclear Regulatory Commission (NRC) and the state of Texas concurred with the ground water protection strategy for the disposal site in September 1992. Surface remedial action in accord with Subpart A was completed in April 1994. The proposed ground water compliance strategy (Subpart B of 40 CFR Part 192 (1994)) at the Falls City site is to perform no remedial action based on application for supplemental standards because the ground water in the uppermost aquifer is classified as Class III ground water. Class III ground water includes ground water that is not a current or potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed by public water supply systems (40 CFR {section} 192.11 (e) (1994)). Although supplemental standards are being applied, the potential use of ground water in the site vicinity will be protected.

  16. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    SciTech Connect

    Not Available

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  17. Site observational work plan for the UMTRA Project Site at Tuba City, Arizona

    SciTech Connect

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. A total of 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. Two processes were used to refine the ore: an acid leach process and a sodium carbonate alkaline process. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The preliminary ground water compliance strategy at the Tuba City site is active remediation. The specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  18. Remedial action plan and site design for stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Final report, Appendixes to attachment 3

    SciTech Connect

    Not Available

    1994-06-01

    This document contains supporting appendices to attachment 3 for the remedial action and site stabilization plan for Maybell, Colorado UMTRA site. Appendix A includes the Hydrological Services Calculations and Appendix B contains Ground Water Quality by Location data.

  19. A Critique of Motivational Bases for Affirmative Action Programs in Postsecondary Education.

    ERIC Educational Resources Information Center

    Barger, Robert N.

    Motivational bases for affirmative action programs, particularly as these programs pertain to postsecondary education, are considered. "Motivational bases" refers to the basic incentives that are invoked in order to gain public support for affirmative action programs. Three types of motivational bases are addressed: those associated with reasons…

  20. From Knowledge to Action: Tips for Encouraging and Measuring Program-Related Behavior Change

    ERIC Educational Resources Information Center

    Chazdon, Scott; Horntvedt, Jody; Templin, Elizabeth

    2016-01-01

    It is challenging to document the behavior changes that result from Extension programming. This article describes an evaluation method we call the "action items method." Unlike other approaches for measuring behavior change, this method requires program participants to define their own action plans as part of a program and then asks them…

  1. 41 CFR 60-2.10 - General purpose and contents of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Identification of problem areas; (iii) Action-oriented programs; and (iv) Periodic internal audits. (c... programs also include internal auditing and reporting systems as a means of measuring the contractor's... contents of affirmative action programs. 60-2.10 Section 60-2.10 Public Contracts and Property...

  2. NASULGC Council on Extension, Committee on Program Innovation and Action Oriented Research; 1968 Report. Part 1. Program Innovations. Part 2. Action Oriented Research.

    ERIC Educational Resources Information Center

    National Association of State Universities and Land Grant Colleges, Washington, DC.

    This report on extension activities of member institutions of the National Association of State Universities and Land Grant Colleges describes 91 program innovations and action oriented research activities. Objectives, sponsorship, program evaluations, and other data are cited for program innovations in such areas as continuing medical education,…

  3. USING RISK-BASED CORRECTIVE ACTION (RBCA) TO ASSESS (THEORETICAL) CANCER DEATHS AVERTED COMPARED TO THE (REAL) COST OF ENVIRONMENTAL REMEDIATION

    SciTech Connect

    Miller, M. L.; Hylko, J. M.

    2002-02-25

    In 1978, on the basis of existing health studies at the time, the Uranium Mill Tailings Remedial Action (UMTRA) Project legislation was proposed that would authorize remedial action at inactive uranium processing sites and vicinity properties. The cost of the program to the Federal Government was expected to be $180 million. With the completion of this project, approximately 1300 theoretical cancer deaths were prevented in the next 100 years at a cost of $1.45 billion, based on the Fiscal Year 1998 Federal UMTRA budget. The individual site costs ranged from $0.2 million up to $18 billion spent per theoretical cancer death averted over the next 100 years. Resources required to sustain remediation activities such as this are subject to reduction over time, and are originally based on conservative assumptions that tend to overestimate risks to the general public. This evaluation used a process incorporating risk-based corrective action (RBCA); a three-tiered, decision-making process tailoring corrective action activities according to site-specific conditions and risks. If RBCA had been applied at the start of the UMTRA Project, and using a criterion of >1 excess cancer death prevented as justification to remediate the site, only 50% of the existing sites would have been remediated, yielding a cost savings of $303.6 million to the Federal Government and affected States, which share 10% of the cost. This cost savings equates to 21% of the overall project budget. In addition, only 22% of the vicinity properties had structural contamination contributing to elevated interior gamma exposure and radon levels. Focusing only on these particular properties could have saved an additional $269.3 million, yielding a total savings of $573 million; 40% of the overall project budget. As operational experience is acquired, including greater understanding of the radiological and nonradiological risks, decisions should be based on the RBCA process, rather than relying on conservative

  4. The 3D Elevation Program initiative: a call for action

    USGS Publications Warehouse

    Sugarbaker, Larry J.; Constance, Eric W.; Heidemann, Hans Karl; Jason, Allyson L.; Lukas, Vicki; Saghy, David L.; Stoker, Jason M.

    2014-01-01

    The 3D Elevation Program (3DEP) initiative is accelerating the rate of three-dimensional (3D) elevation data collection in response to a call for action to address a wide range of urgent needs nationwide. It began in 2012 with the recommendation to collect (1) high-quality light detection and ranging (lidar) data for the conterminous United States (CONUS), Hawaii, and the U.S. territories and (2) interferometric synthetic aperture radar (ifsar) data for Alaska. Specifications were created for collecting 3D elevation data, and the data management and delivery systems are being modernized. The National Elevation Dataset (NED) will be completely refreshed with new elevation data products and services. The call for action requires broad support from a large partnership community committed to the achievement of national 3D elevation data coverage. The initiative is being led by the U.S. Geological Survey (USGS) and includes many partners—Federal agencies and State, Tribal, and local governments—who will work together to build on existing programs to complete the national collection of 3D elevation data in 8 years. Private sector firms, under contract to the Government, will continue to collect the data and provide essential technology solutions for the Government to manage and deliver these data and services. The 3DEP governance structure includes (1) an executive forum established in May 2013 to have oversight functions and (2) a multiagency coordinating committee based upon the committee structure already in place under the National Digital Elevation Program (NDEP). The 3DEP initiative is based on the results of the National Enhanced Elevation Assessment (NEEA) that was funded by NDEP agencies and completed in 2011. The study, led by the USGS, identified more than 600 requirements for enhanced (3D) elevation data to address mission-critical information requirements of 34 Federal agencies, all 50 States, and a sample of private sector companies and Tribal and local

  5. Action-oriented support for occupational safety and health programs in some developing countries in Asia.

    PubMed

    Kawakami, T; Kogi, K

    2001-01-01

    Action-oriented support programs have been increasingly playing vital roles in promoting safety and health in developing countries in Asia. This paper studied achievements of 3 action-oriented support programs: the WISE program for small enterprises, the WIND program for farmers, and the POSITIVE program for workers and trade unions. Special attention was paid to how the programs have strengthened local efforts for sustainable actions in safety and health improvements. The results showed that there were significant achievements in action-oriented support programs in the region, including a large number of improvement examples, integration into government policies, and network support through employers' and workers' organizations. Participatory, action-oriented training tools such as action-checklists, local good example photos, and group work methods played key roles in the effective implementation of the programs. It was of note that there were a number of local efforts to extend the coverage of action-oriented support even to hard-to-reach workers such as home-based workers, rural workers, and ethnic minorities. The efforts included the equal participation in the training by female and male farmers, shortened and weekend training programs, photo sheets showing local good examples, and reasonable fee collection for better sustainability. In conclusion, action-oriented support programs provided local people with concrete means to promote safety and health improvements. The successful programs commonly focused on local initiatives and were built on local wisdom and resources.

  6. UMTRA project water sampling and analysis plan, Old and New Rifle, Colorado

    SciTech Connect

    Not Available

    1994-07-01

    Surface remedial action at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site began in the spring of 1992. Results of water sampling at the Old and New Rifle processing sites for recent years indicate that ground water contamination occurs in the shallow unconfined alluvial aquifer (the uppermost aquifer) and less extensively in the underlying Wasatch Formation. Uranium and sulfate continue to exceed background ground water concentrations and/or maximum concentration limits at and downgradient from the former processing sites. These constituents provide the best indication of changes in contaminant distribution. Contamination in the uppermost (alluvial) aquifer at New Rifle extends a minimum of approximately 5000 feet (ft) (1,524 meters [m]) downgradient. At Old Rifle, the extent of contamination in the alluvial aquifer is much less (a minimum of approximately 1,000 ft [305 m]), partially due to differences in hydrologic regime. For example, the Old Rifle site lies in a relatively narrow alluvial floodplain; the New Rifle site lies in a broad floodplain. Data gathering for the Rifle baseline risk assessment is under way. The purpose of this effort is to determine with greater precision the background ground water quality and extent of ground water contamination at the processing sites. Historical surface water quality indicates that the Colorado River has not been affected by uranium processing activities. No compliance monitoring of the Estes Gulch disposal cell has been proposed, because ground water in the underlying Wasatch Formation is limited use (Class 111) ground water and because the disposal cell is hydrogeologically isolated from the uppermost aquifer.

  7. 41 CFR 60-741.40 - General purpose and applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirement. (a) General purpose. An affirmative action program is a management tool designed to ensure equal... measurable objectives, quantitative analyses, and internal auditing and reporting systems that measure...

  8. WSTF Propulsion and Pyrotechnics Corrective Action Test Program Status-2000

    NASA Technical Reports Server (NTRS)

    Saulsberry, R.; Ramirez, J.; Julien, H. L.; Hart, M.; Smith, W.; Bement, L.; Meagher, N. E.

    2000-01-01

    Extensive propulsion and pyrotechnic testing has been in progress at the NASA Johnson Space Center White Sands Test Facility (WSTF) since 1995. This started with the Mars Observer Propulsion and Pyrotechnics Corrective Action Test Program (MOCATP). The MOCATP has concluded, but extensive pyrovalve testing and research and development has continued at WSTF. The capability to accurately analyze and measure pyrovalve combustion product blow-by, evaluate propellant explosions initiated by blow-by, and characterize pyrovalve operation continues to be used and improved. This paper contains an overview of testing since MOCATP inception, but focuses on accomplishments since the status was last reported at the 35th Joint Propulsion Conference, June, 1999. This new activity includes evaluation of 3/8 inch Conax pyrovalves; development and testing of advanced pyrovalve technologies; investigation of nondestructive evaluation techniques to inspect pyrotechnically induced hydrazine explosions both through testing and modeling. Data from this collection of projects are now being formatted into a pyrovalve applications and testing handbook and consensus standard to benefit pyrovalve users and spacecraft designers. The handbook is briefly described here and in more detail in a separate paper. To increase project benefit, pyrovalve manufacturers are encouraged to provide additional valves for testing and consideration, and feedback is encouraged in all aspects of the pyrotechnic projects.

  9. Making Tracks 1.0: Action Researching an Active Transportation Education Program

    ERIC Educational Resources Information Center

    Robinson, Daniel; Foran, Andrew; Robinson, Ingrid

    2014-01-01

    This paper reports on the results of the first cycle of an action research project. The objective of this action research was to examine the implementation of a school-based active transportation education program (Making Tracks). A two-cycle action research design was employed in which elementary school students' (ages 7-9), middle school…

  10. Building a Knowledge to Action Program in Stroke Rehabilitation.

    PubMed

    Janzen, Shannon; McIntyre, Amanda; Richardson, Marina; Britt, Eileen; Teasell, Robert

    2016-09-01

    The knowledge to action (KTA) process proposed by Graham et al (2006) is a framework to facilitate the development and application of research evidence into clinical practice. The KTA process consists of the knowledge creation cycle and the action cycle. The Evidence Based Review of Stroke Rehabilitation is a foundational part of the knowledge creation cycle and has helped guide the development of best practice recommendations in stroke. The Rehabilitation Knowledge to Action Project is an audit-feedback process for the clinical implementation of best practice guidelines, which follows the action cycle. The objective of this review was to: (1) contextualize the Evidence Based Review of Stroke Rehabilitation and Rehabilitation Knowledge to Action Project within the KTA model and (2) show how this process led to improved evidence-based practice in stroke rehabilitation. Through this process, a single centre was able to change clinical practice and promote a culture that supports the use of evidence-based practices in stroke rehabilitation.

  11. 36 CFR 72.43 - Fundable elements: Recovery Action Program grants.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Fundable elements: Recovery Action Program grants. 72.43 Section 72.43 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Development, Rehabilitation and Innovation § 72.43 Fundable elements: Recovery Action Program...

  12. 36 CFR 72.43 - Fundable elements: Recovery Action Program grants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Fundable elements: Recovery Action Program grants. 72.43 Section 72.43 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Development, Rehabilitation and Innovation § 72.43 Fundable elements: Recovery Action Program...

  13. 36 CFR 72.43 - Fundable elements: Recovery Action Program grants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Fundable elements: Recovery Action Program grants. 72.43 Section 72.43 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Development, Rehabilitation and Innovation § 72.43 Fundable elements: Recovery Action Program...

  14. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Additional required elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... management to ensure the effective implementation of the affirmative action program. (b) Identification...

  15. 41 CFR 60-2.10 - General purpose and contents of affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false General purpose and contents of affirmative action programs. 60-2.10 Section 60-2.10 Public Contracts and Property Management...) An affirmative action program is a management tool designed to ensure equal employment opportunity....

  16. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Additional required elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... management to ensure the effective implementation of the affirmative action program. (b) Identification...

  17. 36 CFR 72.43 - Fundable elements: Recovery Action Program grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Fundable elements: Recovery Action Program grants. 72.43 Section 72.43 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Development, Rehabilitation and Innovation § 72.43 Fundable elements: Recovery Action Program...

  18. 36 CFR 72.43 - Fundable elements: Recovery Action Program grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Fundable elements: Recovery Action Program grants. 72.43 Section 72.43 Parks, Forests, and Public Property NATIONAL PARK SERVICE... Development, Rehabilitation and Innovation § 72.43 Fundable elements: Recovery Action Program...

  19. A Relevant War Against Poverty. A Study of Community Action Programs and Observable Social Change.

    ERIC Educational Resources Information Center

    Clark, Kenneth B.; Hopkins, Jeannette

    Twelve urban community action programs (CAP) were examined in depth to determine how each of them operationally defined community action and to evaluate their performance. The criteria used were: (1) a clear statement of purpose and programs consistent with that purpose; (2) strong independent leadership and a built-in evaluation and…

  20. 36 CFR 72.17 - Preliminary Action Program-commitments to be included.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Preliminary Action Program-commitments to be included. 72.17 Section 72.17 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs §...

  1. The Data-to-Action Framework: A Rapid Program Improvement Process

    ERIC Educational Resources Information Center

    Zakocs, Ronda; Hill, Jessica A.; Brown, Pamela; Wheaton, Jocelyn; Freire, Kimberley E.

    2015-01-01

    Although health education programs may benefit from quality improvement methods, scant resources exist to help practitioners apply these methods for program improvement. The purpose of this article is to describe the Data-to-Action framework, a process that guides practitioners through rapid-feedback cycles in order to generate actionable data to…

  2. Helping Migrant and Seasonal Farm Worker Families. Annual Report 1971 [Migrant Action Program, Mason City, Iowa].

    ERIC Educational Resources Information Center

    Migrant Action Program, Mason City, IA.

    The objective of the Migrant Action Program (MAP) in Iowa is to assist the migrant and seasonal farm workers and their families. This 1971 annual report cntains a description of the program goals and activities, including the Manpower Project, children's programs, day care, vehicle purchase and use, the health program, and emergency food…

  3. UMTRA Project Site Observational Work Plan, Mexican Hat, Utah

    SciTech Connect

    Not Available

    1994-09-01

    Surface cleanup activities at the Mexican Hat UMTRA processing site are nearing completion. Ground Water contamination at the Mexican Hat site is a result of uranium milling operations. The extent of residual process water has been identified, and it is limited to the uppermost aquifer in the vicinity of the site. Deeper aquifers are not affected because of an upward hydraulic gradient and the presence of a confining unit (the deeper aquifers are protected by hydrogeologic isolation). The uppermost unit is returning to its pre-milling, mainly unsaturated state. The unit that contains the contaminated water is not a ground water resource because it qualifies as Class III (limited use) based on limited yield. Ground water in the uppermost unit is currently not used and is not anticipated to be used as a ground water resource. The nearby San Juan River and a converted oil exploration well provide all of the water needs for the area. There are no current threats to human health or livestock; and, because the zone of contamination does not represent a ground water resource, none are anticipated in the future. There are, however, seeps where contaminated water is exposed at land surface. The seeps create potential exposure pathways for plants and wildlife. It is not known at this time if there is a risk to the environment. Additional investigations are needed and are described in this document to confirm the presence or absence of potential environmental risks. Additional hydrogeologic investigations are not required. The proposed ground water compliance strategy for the site is no remediation, because the ground water in the uppermost aquifer (which is also the zone of contamination) qualifies for supplemental standards based on Class III, limited yield, and because there are no threats to human health. Domestic and agricultural water is pumped from a deeper aquifer that is isolated from the contaminated zone.

  4. Teacher Performance Pay Programs and Necessary Communication Actions

    ERIC Educational Resources Information Center

    Heneman, Herbert G., III; Worth, Robin; Arrigoni, Jessica; Kimball, Steven M.; Milanowski, Anthony

    2013-01-01

    Teacher performance pay programs have proliferated across the country over the past 20 years. To aid in understanding their many variations, the seven major components of these programs are described. Three examples of teacher performance pay programs are provided for illustration: Denver ProComp, TAP, and Houston ASPIRE. Evidence is mixed on the…

  5. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    SciTech Connect

    Not Available

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  7. Radiological surveillance of Remedial Action activities at the processing site, Ambrosia Lake, New Mexico, April 12--16, 1993. Final report

    SciTech Connect

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project`s Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Ambrosia Lake, New Mexico. The requirements and attributes examined during the audit were developed from reviewing working-level procedures developed by the RAC. Objective evidence, comments, and observations were verified based on investigating procedures, documentation, records located at the site, personal interviews, and tours of the site. No findings were identified during this audit. Ten site-specific observations, three good practice observations, and five programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Ambrosia Lake, New Mexico, remedial action program are performed adequately. The results of the good practice observations indicate that the site health physics (HP) staff is taking the initiative to address and resolve potential issues, and implement suggestions useful to the UMTRA Project. However, potential exists for improving designated storage areas for general items, and the RAC Project Office should consider resolving site-specific and procedural inconsistencies.

  8. Using Action Research to Engage Youth in Improving OST Programming

    ERIC Educational Resources Information Center

    Hubbard, Brian

    2015-01-01

    Youth are often portrayed as apathetic, uninvolved, and reluctant to participate in their communities (Baizerman, Hildreth, & Roholt, 2013). Ironically, however, communities offer few opportunities for youth to address issues that are compelling to their interests and that engage their commitment and action (Bradford & Cullen, 2012;…

  9. Effectiveness of Mentoring Program Practices. Research in Action. Issue 2

    ERIC Educational Resources Information Center

    DuBois, David L.

    2007-01-01

    This article focuses on mentoring program practices in relation to issues of effectiveness, while recognizing that implications for program quality conceptualized more broadly is a key concern in need of greater investigation. The author provides an overview of selected conceptual and methodological issues involved with identification of…

  10. Granite School District's Comprehensive Counseling and Guidance Program in Action.

    ERIC Educational Resources Information Center

    Petersen, Judy

    This paper discusses the development of the Utah Model for Comprehensive Counseling and Guidance, and specifically, its application in the Granite School Districts Guidance Program. This model adopted the National Occupational Information Coordinating Committee (NOICC) competencies as its desired program content, which focuses on student outcomes.…

  11. YES in Action: Youth Environmental Service Program Summary.

    ERIC Educational Resources Information Center

    Office of Juvenile Justice and Delinquent Prevention (Dept. of Justice), Washington, DC.

    The Youth Environmental Service (YES) aims to rehabilitate adjudicated delinquents and to prevent at-risk youth from entering the juvenile justice system by engaging them in environmental work and education programs on federally owned land. YES is a joint program of the U.S. Department of the Interior (DOI) and the Office of Juvenile Justice and…

  12. An assessment of potential hydrologic and ecologic impacts of constructing mitigation wetlands, Rifle, Colorado, UMTRA project sites

    SciTech Connect

    1995-04-01

    This-assessment examines the consequences and risks that could result from the proposed construction of mitigation wetlands at the New and Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Rifle, Colorado. Remediation of surface contamination at those sites is now under way. Preexisting wetlands at or near the Old and New Rifle sites have been cleaned up, resulting in the loss of 0.7 and 10.5 wetland acres (ac) (0.28 and 4.2 hectares [ha]) respectively. Another 9.9 ac (4.0 ha) of wetlands are in the area of windblown contamination west of the New Rifle site. The US Army Corps of Engineers (USACE) has jurisdiction over the remediated wetlands. Before remedial action began, and before any wetlands were eliminated, the USACE issued a Section 404 Permit that included a mitigation plan for the wetlands to be lost. The mitigation plan calls for 34.2 ac (1 3.8 ha) of wetlands to be constructed at the south end and to the west of the New Rifle site. The mitigation wetlands would be constructed over and in the contaminated alluvial aquifer at the New Rifle site. As a result of the hydrologic characteristics of this aquifer, contaminated ground water would be expected to enter the environment through the proposed wetlands. A preliminary assessment was therefore required to assess any potential ecological risks associated with constructing the mitigation wetlands at the proposed location.

  13. PLAN Bicol, Philippines: health manpower development program in action.

    PubMed

    Lind, K

    1994-06-01

    PLAN Bicol in the Philippines is a community based Health Manpower Development Program (HMDP) geared toward training and mobilization of indigenous health practitioners, providing infrastructural and logistical support to individual families, and educating the community about health, nutrition, and the environment. The field officer recommends at the initiation of a project that program staff have roles that are well defined. New programs should be introduced to the community first and should involve the community in the planning stages. The HMDP program is directed to 38 villages located around national parks that have suffered from deforestation. Community health issues are malnutrition, low immunization, and lack of access to health services. HMDP established a training program for auxiliary health workers (AHWs), who make a commitment to return to their villages after training. Midwives are being trained at local schools. Village houses are being built and repaired; water systems and sanitary toilet facilities are being installed. Village health stations have been constructed and equipped with basic medicines, supplies, and equipment, and are open 5 days a week. Health education classes inform the community about nutrition and health. The problems at inception were the unwillingness of field staff to participate in the program and a high drop out rate among AHWs. Problems were worked out as the program progressed. Facilitative factors are the close coordination with the provincial health office, community acceptance, and the availability of qualified people.

  14. 40 CFR 192.33 - Corrective action programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS Standards for Management of Uranium Byproduct Materials Pursuant to Section 84 of the Atomic Energy Act of 1954, as...

  15. 40 CFR 192.33 - Corrective action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS Standards for Management of Uranium Byproduct Materials Pursuant to Section 84 of the Atomic Energy Act of 1954, as...

  16. 40 CFR 192.33 - Corrective action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS Standards for Management of Uranium Byproduct Materials Pursuant to Section 84 of the Atomic Energy Act of 1954, as...

  17. Project L.O.S.T.: A "Grass Roots" Environmental Action Program by High School Students

    ERIC Educational Resources Information Center

    Hoban, Tana M.

    1977-01-01

    Divided into departments focusing on water analysis, marine studies, wildlife studies, and air analysis, Project Laboratory of Scientific Testing (LOST) is an exemplary ecological action program initiated by teenagers and furthered by community participation in Ithaca, New York. (JC)

  18. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as..., as amended, and its implementing regulations, including 41 CFR part 60-2 (Revised Order 4), will...

  19. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as..., as amended, and its implementing regulations, including 41 CFR part 60-2 (Revised Order 4), will...

  20. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as..., as amended, and its implementing regulations, including 41 CFR part 60-2 (Revised Order 4), will...

  1. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as..., as amended, and its implementing regulations, including 41 CFR part 60-2 (Revised Order 4), will...

  2. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as..., as amended, and its implementing regulations, including 41 CFR part 60-2 (Revised Order 4), will...

  3. Affirmative Action. Module Number 16. Work Experience Program Modules. Coordination Techniques Series.

    ERIC Educational Resources Information Center

    Shawhan, Carl; Morley, Ray

    This self-instructional module, the last in a series of 16 on techniques for coordinating work experience programs, deals with affirmative action. Addressed in the module are the following topics: the nature of affirmative action legislation and regulations, the role of the teacher-coordinator as a resource person for affirmative action…

  4. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the... corrective action remedy; and (iii) Demonstrate compliance with ground-water protection standard pursuant...

  5. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the... corrective action remedy; and (iii) Demonstrate compliance with ground-water protection standard pursuant...

  6. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental receptors to hazardous constituents; (iii) Actual or potential contamination of drinking water...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of...

  7. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... environmental receptors to hazardous constituents; (iii) Actual or potential contamination of drinking water...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of...

  8. 78 FR 11903 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... COMMISSION Acceptability of Corrective Action Programs for Fuel Cycle Facilities AGENCY: Nuclear Regulatory... Fuel Cycle Facilities.'' The draft NUREG provides guidance to the NRC staff on how to determine whether a Corrective Action Plan (CAP) submitted by the licensee of a fuel cycle facility is...

  9. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  10. Action!

    ERIC Educational Resources Information Center

    Senese, Joseph

    1998-01-01

    A small group of teachers at one Illinois high school is helping to effect and promote change. Through the Action Research Laboratory (ARL), teams of teachers conduct collaborative action research to improve classroom practices. Data from the first two years of the ARL indicate that teachers are eager to participate in, and have thrived in, their…

  11. Bellingham Bay action program: Initial data summaries and problem identification

    SciTech Connect

    Decker, D.S.; Sonnerup, R.; Greene, J.J.

    1989-08-01

    The report provides a synthesis of information describing the geographic extent and severity of estuarine contamination in Bellingham Bay within Puget Sound in Washington State. Summaries of existing data are provided for chemical contamination of sediment and biota, microbial contamination, eutrophication and contaminant sources. Original, summarized, tabulated, and mapped data are presented. The objective of the report is to provide a mechanism for comprehensively evaluating pollution problems in the more urbanized embayments and for providing a basis for prioritizing corrective actions. A decision making framework is presented for evaluating and prioritizing both sub-areas within Bellingham Bay and specific contaminant sources.

  12. Afterschool in Action: Innovative Afterschool Programs Supporting Middle School Youth

    ERIC Educational Resources Information Center

    Afterschool Alliance, 2013

    2013-01-01

    The Afterschool Alliance and MetLife Foundation are proud to celebrate a fifth round of the MetLife Foundation Afterschool Innovator Awards. For the past five years, we have collaborated to highlight the work of quality afterschool programs that support children, families and communities across the nation. This compendium is a compilation of four…

  13. The Federal Art Project: Holger Cahill's Program of Action.

    ERIC Educational Resources Information Center

    Mavigliano, George J.

    1984-01-01

    Under the directorship of Holger Cahill, who drew upon John Dewey's principle of the universal communicability of art, the Federal Art Project of the Great Depression era gave all of the people the opportunity to study and enjoy art. Specific programs of the project are described. (RM)

  14. Evaluating Alternative High Schools: Program Evaluation in Action

    ERIC Educational Resources Information Center

    Hinds, Drew Samuel Wayne

    2013-01-01

    Alternative high schools serve some of the most vulnerable students and their programs present a significant challenge to evaluate. Determining the impact of an alternative high school that serves mostly at-risk students presented a significant research problem. Few studies exist that dig deeper into the characteristics and strategies of…

  15. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    SciTech Connect

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  16. Programming for safe motherhood: a guide to action.

    PubMed

    Koblinsky, M A; Tinker, A; Daly, P

    1994-09-01

    The Safe Motherhood Initiative has successfully stimulated much interest in reducing maternal mortality. To accelerate programme implementation, this paper reviews lessons learned from the experience of industrial countries and from demonstration projects in developing countries, and proposes intervention strategies of policy dialogue, improved services and behavioural change. A typological approach with three hypothetical settings from resource poor to resource rich environments is used to address the variability in health behaviours and infrastructure encountered when programming for safe motherhood.

  17. How Young Children Learn to Program with Sensor, Action, and Logic Blocks

    ERIC Educational Resources Information Center

    Wyeth, Peta

    2008-01-01

    Electronic Blocks are a new programming environment designed specifically for children aged between 3 and 8 years. These physical, stackable blocks include sensor blocks, action blocks, and logic blocks. By connecting these blocks, children can program a wide variety of structures that interact with one another and the environment. Electronic…

  18. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  19. National Clearinghouse for Drug Abuse Information Report Series, Series 22, No. 1. Community Action Programs.

    ERIC Educational Resources Information Center

    National Inst. on Drug Abuse (DHEW/PHS), Rockville, MD. National Clearinghouse for Drug Abuse Information.

    Based on the principle that drug abuse is no longer a problem restricted to certain economic, social, educational, or intellectual levels or ethnic groups, this pamphlet relates some examples of on-going community action programs and projects. Essentially, these programs are striving to solve some of the drug related problems in their immediate…

  20. Affirmative Action Strategies and Professional Schools: Case Illustrations of Exemplary Programs.

    ERIC Educational Resources Information Center

    Twale, Darla J.; And Others

    Seven case illustrations of affirmative action (AFA) programs are presented. Increases in the numbers of women and minority students at professional schools have been reported, but disadvantaged populations still suffer underrepresentation. The literature indicates that effective AFA may be realized through: early identification programs and…

  1. PROGRAM TO TRAIN TRADE UNIONISTS AND CAA STAFF WORKERS AS COMMUNITY ACTION TRAINERS, CURRICULUM AND SCHEDULE.

    ERIC Educational Resources Information Center

    EIGER, NORMAN

    OBJECTIVES OF THE TEN-DAY RESIDENTIAL TRAINING PROGRAM HELD IN JUNE 1967 WERE--TO UNDERSTAND THE ROLE OF THE TRAINER, TO DEVELOP SKILLS AND KNOWLEDGE IN WORKING WITH GROUPS AND IN IMPLEMENTING COMMUNITY ACTION TRAINING PROGRAMS, TO HEIGHTEN SELF-AWARENESS, TO LEARN TO APPLY FORCE FIELD ANALYSIS TO PROBLEM SOLVING, TO INTERPRET LABOR'S POSITION IN…

  2. Using Work Action Analysis to Identify Web-Portal Requirements for a Professional Development Program

    ERIC Educational Resources Information Center

    Nickles, George

    2007-01-01

    This article describes using Work Action Analysis (WAA) as a method for identifying requirements for a web-based portal that supports a professional development program. WAA is a cognitive systems engineering method for modeling multi-agent systems to support design and evaluation. A WAA model of the professional development program of the…

  3. 41 CFR 60-2.10 - General purpose and contents of affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) An affirmative action program is a management tool designed to ensure equal employment opportunity. A... programs also include internal auditing and reporting systems as a means of measuring the contractor's... perspective, as a powerful management tool, there is a positive correlation between the presence...

  4. Implementing Experiential Action Learning in International Management Education: The Global Business Strategic (GLOBUSTRAT) Consulting Program

    ERIC Educational Resources Information Center

    Kamath, Shyam; Agrawal, Jagdish; Krickx, Guido

    2008-01-01

    This paper discusses the theoretical foundations and implementation challenges and outcomes of a unique "hands-on" global consulting program that is integrated into an international EMBA program for mid-career and senior American and European managers. It details the challenges for the integration of experiential action learning, double-loop…

  5. Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico

    SciTech Connect

    1995-11-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented.

  6. Supplement to the site observational work plan for the UMTRA Project Site at Ambrosia Lake, New Mexico

    SciTech Connect

    1996-02-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of (1) the average linear velocity of the ground water in the alluvium; (2) the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale; and (3) the fate and transport of contaminants from the uppermost aquifer to the Westwater Canyon Member of the Morrison Formation. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Shale unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. Figure 1 is a geologic cross section depicting the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Table 1 presents hydrogeologic information of each hydrostratigraphic unit.

  7. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... from public disclosure under 14 CFR part 193. 3. Overview a. Qualified Participants. Technical... submitted by a qualified participant under the T-SAP or ATSAP, that is accepted into either program... Participate. Individuals who are qualified participants register for, and submit a report into, the...

  8. Program overview: Remedial actions at Oak Ridge National Laboratory

    SciTech Connect

    Bates, L.D.; Trabalka, J.R.

    1988-07-27

    Research on and development of civilian and defense uses of nuclear materials and technologies have occurred at Oak Ridge National Laboratory (ORNL) since its creation as part of the World War II Manhattan Project in 1943. A diverse legacy of contaminated inactive facilities, research areas, and waste management areas exists; many are candidates for remedial action. Most attention is focused on waste management sites which contain the bulk of ORNL's environmental contamination. A wide variety of liquid and solid wastes, primarily radioactive wastes or mixed wastes in which radioactivity was the principal hazardous constituent, have been disposed of on-site in the past 45 years. One potential approach to remedial problems at ORNL is to design primarily for control and decay in situ (during an institutional control period of 100 years or more) of intermediate-lived wastes such as /sup 3/H, /sup 90/Sr, and /sup 137/Cs. Passive measures designed to provide greater long-term confinement (for example, in situ vitrification) could be exercised at sites contaminated with TRU wastes or high concentrations of hazardous constitutes. This approach would (a) provide a period sufficiently long for evaluation of the effectiveness of environmental processes and passive remedial measures in controlling the migration of long-lived materials, (b) allow additional time needed for development of new technologies for more permanent site stabilization, and (c) reduce the need for immediate implementation of the more-expensive exhumation and disposal option.

  9. Generic radiological characterization protocol for surveys conducted for DOE remedial action programs

    SciTech Connect

    Berven, B.A.; Cottrell, W.D.; Leggett, R.W.; Little, C.A.; Myrick, T.E.; Goldsmith, W.A.; Haywood, F.F.

    1986-05-01

    This report describes goals and methodology that can be used by radiological survey contractors in surveys at properties associated with the Department of Energy's remedial action programs. The description includes: (1) a general discussion of the history of the remedial action programs; (2) the types of surveys that may be employed by the Radiological Survey Activities (RASA) contractor; (3) generic survey methods that may be used during radiological surveys; and (4) a format for presenting information and data in a survey report. 9 refs.

  10. 25 CFR 256.28 - What can I do if I disagree with actions taken under the Housing Improvement Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Housing Improvement Program? 256.28 Section 256.28 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HOUSING HOUSING IMPROVEMENT PROGRAM § 256.28 What can I do if I disagree with actions taken under the Housing Improvement Program? You may appeal action or inaction by an official of the Bureau...

  11. 25 CFR 256.28 - What can I do if I disagree with actions taken under the Housing Improvement Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Housing Improvement Program? 256.28 Section 256.28 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HOUSING HOUSING IMPROVEMENT PROGRAM § 256.28 What can I do if I disagree with actions taken under the Housing Improvement Program? You may appeal action or inaction by an official of the Bureau...

  12. UMTRA project water sampling and analysis plan, Durango, Colorado

    SciTech Connect

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  13. Action Research as an Approach to Integrating Sustainability into MBA Programs: An Exploratory Study

    ERIC Educational Resources Information Center

    Benn, Suzanne; Dunphy, Dexter

    2009-01-01

    This article reports on an exploratory project that employed an action research approach to integrating sustainability into core subjects in the MBA program at an Australian university. It documents the change methodology used, the theoretical basis for this choice, and the project outcomes. It then identifies some key enabling factors and…

  14. A Structuration Theory Analysis of the Refugee Action Support Program in Greater Western Sydney

    ERIC Educational Resources Information Center

    Naidoo, Loshini

    2009-01-01

    This article uses Gidden's structuration theory to analyse the Refugee Action Support program in Greater Western Sydney. The study shows that many refugee students in Australian high schools experience difficulty with academic transition in mainstream classrooms due to their previous experiences in war-torn countries. As a result of the trauma…

  15. The DiabetAction Program: Implementation in Community-Based Settings

    ERIC Educational Resources Information Center

    Mathieu, Marie-Eve; Brochu, Martin; Beliveau, Louise

    2009-01-01

    Developed for specialists who want to increase the physical activity (PA) level of type 2 diabetic and at-risk individuals, the 10-week DiabetAction program introduced participants to a wide variety of cardiovascular, resistance, balance, and flexibility exercises. Thirty-three of 48 individuals completed the intervention in community-based…

  16. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS... Commission will, in accordance with the “substantial weight” provisions of section 706 of the Act, find no... or programs executed by agreement with State or local government agencies, or by order of State...

  17. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS... Commission will, in accordance with the “substantial weight” provisions of section 706 of the Act, find no... or programs executed by agreement with State or local government agencies, or by order of State...

  18. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS... Commission will, in accordance with the “substantial weight” provisions of section 706 of the Act, find no... or programs executed by agreement with State or local government agencies, or by order of State...

  19. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS... Commission will, in accordance with the “substantial weight” provisions of section 706 of the Act, find no... or programs executed by agreement with State or local government agencies, or by order of State...

  20. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS... Commission will, in accordance with the “substantial weight” provisions of section 706 of the Act, find no... or programs executed by agreement with State or local government agencies, or by order of State...

  1. The Transformative Power of Youth Action Coalition's Multimodal Arts-for-Change Programming

    ERIC Educational Resources Information Center

    Turner, K. C. Nat; Way, Kate; Gray, Robin R. R.

    2013-01-01

    This article analyzes the potential of a series of Youth Action Coalition's (YAC) Arts-for-Change (AfC) youth programs for literacy and identity development, as well as for engaging youth in addressing issues of social justice. Drawing primarily on transcripts of interviews, surveys, and participant-observation fieldnotes inventorying changes in…

  2. 41 CFR 60-2.10 - General purpose and contents of affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... number of quantitative analyses designed to evaluate the composition of the workforce of the contractor... perspective, as a powerful management tool, there is a positive correlation between the presence of... affirmative action program must include the following quantitative analyses: (i) Organizational profile—§...

  3. 41 CFR 60-250.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS Affirmative Action Program § 60-250.40 Applicability of the... paragraph (a) of this section shall, within 120 days of the commencement of a contract, prepare and...

  4. 41 CFR 60-300.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTRACTORS AND SUBCONTRACTORS REGARDING DISABLED VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.40 Applicability of... described in paragraph (a) of this section shall, within 120 days of the commencement of a contract,...

  5. Affirmative Action Strategies and Professional Schools: Case Illustrations of Exemplary Programs.

    ERIC Educational Resources Information Center

    Twale, Darla J.; And Others

    1992-01-01

    A study of seven diverse professional schools suggests that, although a variety of strategies (e.g., early identification, preprofessional contact, resocialization of faculty and matriculated students, and support services) can produce successful affirmative action for women and minority students, a concise, directed program geared to the school's…

  6. 49 CFR 26.107 - What enforcement actions apply to firms participating in the DBE program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... take enforcement action under 49 CFR Part 31, Program Fraud and Civil Remedies, against any participant... under 49 CFR part 29. (b) If you are a firm that, in order to meet DBE contract goals or other DBE... initiate suspension or debarment proceedings against you under 49 CFR part 29. (c) In a suspension...

  7. 49 CFR 26.107 - What enforcement actions apply to firms participating in the DBE program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) The Department may take enforcement action under 49 CFR Part 31, Program Fraud and Civil Remedies... under 2 CFR parts 180 and 1200. (b) If you are a firm that, in order to meet DBE contract goals or other... Department may initiate suspension or debarment proceedings against you under 2 CFR parts 180 and 1200....

  8. 49 CFR 26.107 - What enforcement actions apply to firms participating in the DBE program?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) The Department may take enforcement action under 49 CFR Part 31, Program Fraud and Civil Remedies... under 2 CFR parts 180 and 1200. (b) If you are a firm that, in order to meet DBE contract goals or other... Department may initiate suspension or debarment proceedings against you under 2 CFR parts 180 and 1200....

  9. 49 CFR 26.107 - What enforcement actions apply to firms participating in the DBE program?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) The Department may take enforcement action under 49 CFR Part 31, Program Fraud and Civil Remedies... under 2 CFR parts 180 and 1200. (b) If you are a firm that, in order to meet DBE contract goals or other... Department may initiate suspension or debarment proceedings against you under 2 CFR parts 180 and 1200....

  10. Place-Based Learning: Action Learning in MA Program for Educational Practitioners

    ERIC Educational Resources Information Center

    Glassner, Amnon; Eran-Zoran, Yael

    2016-01-01

    The study presents a new pedagogical idea and practice for educational practitioners. The practice was developed as a workshop of MA program in order to change and expand the meaning of education for the wellbeing of the community. The "place-based learning" workshop combined action learning (AL) with project-based learning (PBL). The…

  11. 77 FR 68790 - Program Comment Issued for Streamlining Section 106 Review for Actions Affecting Post-1945...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    .../archive/NotesDocs/25-25%2815%29_FR.pdf ). (A) Reinforced concrete slab bridges (i) Reinforced concrete... Concrete and Steel Bridges AGENCY: Advisory Council on Historic Preservation. ACTION: Program Comment issued for streamlining Section 106 review for undertakings affecting post-1945 concrete and...

  12. Using Participatory Action Research To Evaluate Programs Serving People with Severe Disabilities: Reflections from the Field.

    ERIC Educational Resources Information Center

    Stevens, Karen A.; Folchman, Ruth

    1998-01-01

    This article discusses challenges in using participatory action research (PAR) in the evaluation of programs that provide services and supports to people with severe disabilities. Challenges include the need for modification of the model, time constraints, issues around power and position, and inclusion of individuals with severe disabilities.…

  13. Promoting the Development of Moral Identity, Behavior, and Commitment in a Social Action Program

    ERIC Educational Resources Information Center

    Jones, Jeffrey N.; Warnaar, Bethany L.; Bench, Joshua H.; Stroup, John

    2014-01-01

    Involvement in social action and community service can promote the construction of prosocial identities and enduring patterns of civic behavior. This article explores this important process for youth that participate in the PeaceJam Ambassadors program. High school-aged "PeaceJammers" study the lives of Nobel Peace laureates while…

  14. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  15. Ohio`s Voluntary Action Program: An economic development tool or a subtle environmental loophole?

    SciTech Connect

    Akinmoladun, T.M.; Lewis, R.A.

    1998-05-01

    In an effort to remediate and reuse abandoned or contaminated industrial properties, the Ohio State legislature passed a law in 1994 that created the Ohio Voluntary Action Program (VAP). VAP consists of a series of incentives for property owners and prospective buyers to accelerate cleanup and reuse of abandoned sites or brownfields. This paper examines the essence of this unconventional approach to socio-economic development and environmental restoration. The weaknesses of the program are discussed, and recommendations are made to make the program more workable, more realistic, and conducive to environmental protection and public health.

  16. The Data-to-Action Framework: A Rapid Program Improvement Process.

    PubMed

    Zakocs, Ronda; Hill, Jessica A; Brown, Pamela; Wheaton, Jocelyn; Freire, Kimberley E

    2015-08-01

    Although health education programs may benefit from quality improvement methods, scant resources exist to help practitioners apply these methods for program improvement. The purpose of this article is to describe the Data-to-Action framework, a process that guides practitioners through rapid-feedback cycles in order to generate actionable data to improve implementation of ongoing programs. The framework was designed while implementing DELTA PREP, a 3-year project aimed at building the primary prevention capacities of statewide domestic violence coalitions. The authors describe the framework's main steps and provide a case example of a rapid-feedback cycle and several examples of rapid-feedback memos produced during the project period. The authors also discuss implications for health education evaluation and practice.

  17. The Data-to-Action Framework: A Rapid Program Improvement Process.

    PubMed

    Zakocs, Ronda; Hill, Jessica A; Brown, Pamela; Wheaton, Jocelyn; Freire, Kimberley E

    2015-08-01

    Although health education programs may benefit from quality improvement methods, scant resources exist to help practitioners apply these methods for program improvement. The purpose of this article is to describe the Data-to-Action framework, a process that guides practitioners through rapid-feedback cycles in order to generate actionable data to improve implementation of ongoing programs. The framework was designed while implementing DELTA PREP, a 3-year project aimed at building the primary prevention capacities of statewide domestic violence coalitions. The authors describe the framework's main steps and provide a case example of a rapid-feedback cycle and several examples of rapid-feedback memos produced during the project period. The authors also discuss implications for health education evaluation and practice. PMID:26245935

  18. UMTRA project water sampling and analysis plan, Gunnison, Colorado

    SciTech Connect

    Not Available

    1994-06-01

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for water sampling activities for calendar year 1994. A buffer zone monitoring plan is included as an appendix. The buffer zone monitoring plan is designed to protect the public from residual contamination that entered the ground water as a result of former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually in 1994 at the Gunnison processing site (GUN-01) and disposal site (GUN-08). Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer (Tertiary gravels) at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted at least semiannually during and one year following the period of construction activities, to comply with the ground water protection strategy discussed in the remedial action plan (DOE, 1992a).

  19. Representing the Programming Process: Goal Structures and Action Sequences in LOGO Programming.

    ERIC Educational Resources Information Center

    McAllister, Alan

    This study developed representations of the LOGO programming process which provide the basis for strategy analyses and a new perspective on problem solving in complex, semantically rich task environments such as LOGO. Nine students, ages 10 to 14, who had been identified as gifted and had previous programming experience, were trained in the…

  20. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    SciTech Connect

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  1. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 2

    SciTech Connect

    1993-12-31

    This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  2. New Mexico state information handbook: formerly utilized sites remedial action program

    SciTech Connect

    2014-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  3. New York state information handbook formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  4. New Mexico state information handbook formerly utilized sites remedial action program

    SciTech Connect

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Informaion Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. Modularity and hierarchical organization of action programs in human acquisition of graphic skills.

    PubMed

    Manoel, Edison de J; Basso, Luciano; Correa, Umberto C; Tani, Go

    2002-12-25

    If motor or action programs become modules with practice their defining features (e.g. relative timing) should remain relatively invariant in new tasks. To test this hypothesis 24 adults practiced a graphic skill over 100 trials and were transferred to a more complex task enclosing the practiced figure. The data acquired by a digital tablet resulted in total movement and total pause times to draw the figure indicating skill acquisition and variability measures of relative timing and pause time and sequencing referring to features that identify a module. Being transferred to a more complex task did not lead to significant increases in the time to perform the criterion figure embedded in the new pattern. Modularity was evidenced by the stability of relative timing and sequencing shown in the performance of the criterion figure. Hence, it might be that action programs become modules that are then hierarchically organized to form more complex skills.

  6. UMTRA Project water sampling and analysis plan, Falls City, Texas

    SciTech Connect

    Not Available

    1994-02-01

    Surface remedial action will be completed at the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site in the spring of 1994. Results of water sampling activity from 1989 to 1993 indicate that ground water contamination occurs primarily in the Deweesville/Conquista aquifer (the uppermost aquifer) and that the contamination migrates along four distinct contaminant plumes. Contaminated ground water from some wells in these regions has significantly elevated levels of aluminum, arsenic, cadmium, manganese, molybdenum, selenium, sulfate, and uranium. Contamination in the Dilworth aquifer was identified in monitor well 977 and in monitor well 833 at the southern edge of former tailings pile 4. There is no evidence that surface water quality in Tordilla and Scared Dog Creeks is impacted by tailings seepage. The following water sampling activities are planned for calendar year 1994: (1) Ground water sampling from 15 monitor wells to monitor the migration of the four major contaminant plumes within the Deweesville/Conquista aquifer. (2) Ground water sampling from five monitor wells to monitor contaminated and background ground water quality conditions in the Dilworth aquifer. Because of disposal cell construction activities, all plume monitor wells screened in the Dilworth aquifer were abandoned. No surface water locations are proposed for sampling. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the Deweesville/Conquista aquifer downgradient of the disposal cell. The list of analytes has been modified with time to reflect constituents currently related to uranium processing activities and natural uranium mineralization. Water sampling is normally conducted biannually in late summer and midwinter.

  7. Programming or inhibiting action: evidence for differential autonomic nervous system response patterns.

    PubMed

    Collet, C; Dittmar, A; Vernet-Maury, E

    1999-06-01

    In the general context of decision-making analysis, the aim of this study was to investigate autonomic nervous system activity when movement execution is inhibited just before onset. Using a 'Go/NoGo' paradigm, 16 subjects (nine males and seven females) had to intercept green table-tennis balls thrown by a robot, with the inner side of their hand and by arm extension. Conversely, they had to inhibit movement programming when a red ball was thrown. Results were displayed in terms of success or failure in view of the aim of each trial. Electrodermal, thermo-vascular and cardio-respiratory parameters were continuously recorded from the non-dominant hand. Results showed that the duration of autonomic responses was significantly longer in action than in inhibition. Temperature responses were negative but significantly more marked in action. Instantaneous respiratory frequency amplitude responses were positive in both action and inhibition conditions, but higher in action. Instantaneous heart rate responses confirmed that inhibition elicits cardiac deceleration. Autonomic responses were shown capable of distinguishing action from inhibition, thus reflecting central nervous system functioning. Results are discussed in terms of autonomic response specificity. PMID:10437637

  8. Learning Spatio-Temporal Representations for Action Recognition: A Genetic Programming Approach.

    PubMed

    Liu, Li; Shao, Ling; Li, Xuelong; Lu, Ke

    2016-01-01

    Extracting discriminative and robust features from video sequences is the first and most critical step in human action recognition. In this paper, instead of using handcrafted features, we automatically learn spatio-temporal motion features for action recognition. This is achieved via an evolutionary method, i.e., genetic programming (GP), which evolves the motion feature descriptor on a population of primitive 3D operators (e.g., 3D-Gabor and wavelet). In this way, the scale and shift invariant features can be effectively extracted from both color and optical flow sequences. We intend to learn data adaptive descriptors for different datasets with multiple layers, which makes fully use of the knowledge to mimic the physical structure of the human visual cortex for action recognition and simultaneously reduce the GP searching space to effectively accelerate the convergence of optimal solutions. In our evolutionary architecture, the average cross-validation classification error, which is calculated by an support-vector-machine classifier on the training set, is adopted as the evaluation criterion for the GP fitness function. After the entire evolution procedure finishes, the best-so-far solution selected by GP is regarded as the (near-)optimal action descriptor obtained. The GP-evolving feature extraction method is evaluated on four popular action datasets, namely KTH, HMDB51, UCF YouTube, and Hollywood2. Experimental results show that our method significantly outperforms other types of features, either hand-designed or machine-learned.

  9. Probabilistic Planning with Imperfect Sensing Actions Using Hybrid Probabilistic Logic Programs

    NASA Astrophysics Data System (ADS)

    Saad, Emad

    Effective planning in uncertain environment is important to agents and multi-agents systems. In this paper, we introduce a new logic based approach to probabilistic contingent planning (probabilistic planning with imperfect sensing actions), by relating probabilistic contingent planning to normal hybrid probabilistic logic programs with probabilistic answer set semantics [24]. We show that any probabilistic contingent planning problem can be encoded as a normal hybrid probabilistic logic program. We formally prove the correctness of our approach. Moreover, we show that the complexity of finding a probabilistic contingent plan in our approach is NP-complete. In addition, we show that any probabilistic contingent planning problem, \\cal PP, can be encoded as a classical normal logic program with answer set semantics, whose answer sets corresponds to valid trajectories in \\cal PP. We show that probabilistic contingent planning problems can be encoded as SAT problems. We present a new high level probabilistic action description language that allows the representation of sensing actions with probabilistic outcomes.

  10. Data base management for the Remedial Action Program at Oak Ridge National Laboratory

    SciTech Connect

    Voorhees, L.D.; Cushman, R.M.; Faulkner, M.A.; Horwedel, B.M.

    1986-08-01

    The Oak Ridge National Laboratory's (ORNL's) Remedial Action Program was established to provide appropriate corrective measures at over 140 sites that were contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted which will result in the collection of an unprecedented amount of data for the ORNL site. To manage such data effectively and efficiently, a computerized data base is being developed. The data base provides a unified repository for all data generated within the Remedial Action Program, to allow for necessary storage, manipulation, analyses, assessment, display, and report generation. Data base management for the Remedial Action Program is documented in this report by: (1) defining the organization of the data management staff and the services provided; (2) describing the design of the data base, including its management system, organization, and applications; (3) providing examples of the current and anticipated tasks; and (4) discussing quality assurance measures implemented to control the accuracy of the data entries and the security of the data.

  11. UMTRA project water sampling and analysis plan, Grand Junction, Colorado

    SciTech Connect

    Not Available

    1994-07-01

    Surface remedial action will be completed at the Grand Junction processing site during the summer of 1994. Results of 1993 water sampling indicate that ground water flow conditions and ground water quality at the processing site have remained relatively constant with time. Uranium concentrations in ground water continue to exceed the maximum concentration limits, providing the best indication of the extent of contaminated ground water. Evaluation of surface water quality of the Colorado River indicate no impact from uranium processing activities. No compliance monitoring at the Cheney disposal site has been proposed because ground water in the Dakota Sandstone (uppermost aquifer) is classified as limited-use (Class 111) and because the disposal cell is hydrogeologically isolated from the uppermost aquifer. The following water sampling and water level monitoring activities are planned for calendar year 1994: (i) Semiannual (early summer and late fall) sampling of six existing monitor wells at the former Grand Junction processing site. Analytical results from this sampling will be used to continue characterizing hydrogeochemical trends in background ground water quality and in the contaminated ground water area resulting from source term (tailings) removal. (ii) Water level monitoring of approximately three proposed monitor wells projected to be installed in the alluvium at the processing site in September 1994. Data loggers will be installed in these wells, and water levels will be electronically monitored six times a day. These long-term, continuous ground water level data will be collected to better understand the relationship between surface and ground water at the site. Water level and water quality data eventually will be used in future ground water modeling to establish boundary conditions in the vicinity of the Grand Junction processing site. Modeling results will be used to help demonstrate and document the potential remedial alternative of natural flushing.

  12. Assurance Program for Remedial Action (APRA) microcomputer-operated bibliography management system

    SciTech Connect

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1985-06-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II language, which is designed to operate using the commercially available dBASE II database software. This document describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. A User's Manual is also provided in the document. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project.

  13. Assessment of the NASA Space Shuttle Program's Problem Reporting and Corrective Action System

    NASA Technical Reports Server (NTRS)

    Korsmeryer, D. J.; Schreiner, J. A.; Norvig, Peter (Technical Monitor)

    2001-01-01

    This paper documents the general findings and recommendations of the Design for Safety Programs Study of the Space Shuttle Programs (SSP) Problem Reporting and Corrective Action (PRACA) System. The goals of this Study were: to evaluate and quantify the technical aspects of the SSP's PRACA systems, and to recommend enhancements addressing specific deficiencies in preparation for future system upgrades. The Study determined that the extant SSP PRACA systems accomplished a project level support capability through the use of a large pool of domain experts and a variety of distributed formal and informal database systems. This operational model is vulnerable to staff turnover and loss of the vast corporate knowledge that is not currently being captured by the PRACA system. A need for a Program-level PRACA system providing improved insight, unification, knowledge capture, and collaborative tools was defined in this study.

  14. Radiological protection guidelines for the Formerly Utilized Sites Remedial Action Program and Remote Surplus Facilities Management Program

    SciTech Connect

    Gilbert, T.L.

    1984-01-01

    The need for a definitive basis for radiological guidelines and criteria for FUSRAP became apparent by 1981 and led ORO to sponsor a joint ANL/BNI/LANL/ORO effort under the chairmanship of Wayne Hansen (LANL) that resulted in a final FUSRAP radiological guidelines document in March 1983. A separate effort to develop guidelines for remedial action criteria for SFMP was in progress at PNL. The need to coordinate both efforts with impending revisions of DOE Radiological Protection Standards and impending new developments in EPA and NRC Radiological Protection Standards led to convening of the first DOE Workshop on Remedial Action Criteria in Gaithersburg, Maryland, in February 1984, followed by a second workshop in June 1984 at ANL. The major decisions were to base the criteria on dosimetry models and basic limits currently recommended by the International Commission on Radiological Protection, to emphasize the development and use of site-specific rather than generic guidelines and criteria for residual radionuclide concentrations in the ground, and to prepare a manual to accompany the guidelines that would present procedures and tables for deriving site-specific soil guidelines and criteria for the remedial action programs. A joint ANL/LANL/ORNL/PNL effort to prepare a definitive set of guidelines and a manual has been initiated. The scope, status, and current plans for this effort, and some of the key issues, are presented. 10 references, 1 table.

  15. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    SciTech Connect

    Sigmon, C.F.; Levine, M.B.

    1990-03-02

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab.

  16. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  17. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    SciTech Connect

    Little, C.A.; Berven, B.A.; Carter, T.E.; Espegren, M.L.; O'Donnell, F.R.; Ramos, S.J.; Retolaza, C.D.; Rood, A.S.; Santos, F.A.; Witt, D.A.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards.

  18. Computed tomography screening: the international early lung cancer action program experience.

    PubMed

    Henschke, Claudia I; Boffetta, Paolo; Yankelevitz, David F; Altorki, Nasser

    2015-05-01

    The International Early Lung Cancer Action Program (I-ELCAP) used a novel study design that provided quantitative information about annual CT screening for lung cancer. The results stimulated additional studies of lung cancer screening and ultimately led to the National Lung Screening Trial (NLST) being initiated in 2002, as the initial report in 1999 was sufficiently compelling to reawaken interest in screening for lung cancer. The authors think that the I-ELCAP and NLST "story" provides a strong argument for relevant agencies to consider alternative study designs for the public funding of studies aimed at evaluating the effectiveness of screening and other medical trials.

  19. Reducing cyberbullying: A theory of reasoned action-based video prevention program for college students.

    PubMed

    Doane, Ashley N; Kelley, Michelle L; Pearson, Matthew R

    2016-01-01

    Few studies have evaluated the effectiveness of cyberbullying prevention/intervention programs. The goals of the present study were to develop a Theory of Reasoned Action (TRA)-based video program to increase cyberbullying knowledge (1) and empathy toward cyberbullying victims (2), reduce favorable attitudes toward cyberbullying (3), decrease positive injunctive (4) and descriptive norms about cyberbullying (5), and reduce cyberbullying intentions (6) and cyberbullying behavior (7). One hundred sixty-seven college students were randomly assigned to an online video cyberbullying prevention program or an assessment-only control group. Immediately following the program, attitudes and injunctive norms for all four types of cyberbullying behavior (i.e., unwanted contact, malice, deception, and public humiliation), descriptive norms for malice and public humiliation, empathy toward victims of malice and deception, and cyberbullying knowledge significantly improved in the experimental group. At one-month follow-up, malice and public humiliation behavior, favorable attitudes toward unwanted contact, deception, and public humiliation, and injunctive norms for public humiliation were significantly lower in the experimental than the control group. Cyberbullying knowledge was significantly higher in the experimental than the control group. These findings demonstrate a brief cyberbullying video is capable of improving, at one-month follow-up, cyberbullying knowledge, cyberbullying perpetration behavior, and TRA constructs known to predict cyberbullying perpetration. Considering the low cost and ease with which a video-based prevention/intervention program can be delivered, this type of approach should be considered to reduce cyberbullying.

  20. Reducing cyberbullying: A theory of reasoned action-based video prevention program for college students.

    PubMed

    Doane, Ashley N; Kelley, Michelle L; Pearson, Matthew R

    2016-01-01

    Few studies have evaluated the effectiveness of cyberbullying prevention/intervention programs. The goals of the present study were to develop a Theory of Reasoned Action (TRA)-based video program to increase cyberbullying knowledge (1) and empathy toward cyberbullying victims (2), reduce favorable attitudes toward cyberbullying (3), decrease positive injunctive (4) and descriptive norms about cyberbullying (5), and reduce cyberbullying intentions (6) and cyberbullying behavior (7). One hundred sixty-seven college students were randomly assigned to an online video cyberbullying prevention program or an assessment-only control group. Immediately following the program, attitudes and injunctive norms for all four types of cyberbullying behavior (i.e., unwanted contact, malice, deception, and public humiliation), descriptive norms for malice and public humiliation, empathy toward victims of malice and deception, and cyberbullying knowledge significantly improved in the experimental group. At one-month follow-up, malice and public humiliation behavior, favorable attitudes toward unwanted contact, deception, and public humiliation, and injunctive norms for public humiliation were significantly lower in the experimental than the control group. Cyberbullying knowledge was significantly higher in the experimental than the control group. These findings demonstrate a brief cyberbullying video is capable of improving, at one-month follow-up, cyberbullying knowledge, cyberbullying perpetration behavior, and TRA constructs known to predict cyberbullying perpetration. Considering the low cost and ease with which a video-based prevention/intervention program can be delivered, this type of approach should be considered to reduce cyberbullying. PMID:26349445

  1. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs. 120.1425 Section 120.1425 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions §...

  2. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs. 120.1425 Section 120.1425 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions §...

  3. 13 CFR 120.1540 - Types of enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Types of enforcement actions-Intermediaries participating in the Microloan Program and NTAPs. 120.1540 Section 120.1540 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions §...

  4. 13 CFR 120.1540 - Types of enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Types of enforcement actions... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120.1540 Types of enforcement actions—Intermediaries participating in the Microloan Program and NTAPs....

  5. 13 CFR 120.1540 - Types of enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Types of enforcement actions... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120.1540 Types of enforcement actions—Intermediaries participating in the Microloan Program and NTAPs....

  6. 13 CFR 120.1540 - Types of enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Types of enforcement actions... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120.1540 Types of enforcement actions—Intermediaries participating in the Microloan Program and NTAPs....

  7. 13 CFR 120.1540 - Types of enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Types of enforcement actions... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120.1540 Types of enforcement actions—Intermediaries participating in the Microloan Program and NTAPs....

  8. The Expedited Remedial Action Program: A case study. The Alhambra Front Street manufactured gas plant site

    SciTech Connect

    Padleschat, J.A.; McMahon, T.D.

    1996-12-31

    Early in 1995, the Department of Toxic Substances Control asked Southern California Gas Company (SoCalGas) to enter one of its manufactured gas plant (MGP) sites into the new Expedited Remedial Action Program (ERAP). SoCalGas initially was not enthusiastic about the new program. Nevertheless, SoCalGas submitted an application for its Alhambra MGP site to be selected for the ERAP. The Alhambra Site was accepted into ERAP in November 1995, and was the first ERAP site to have orphan shares. MGP sites are well suited to the ERAP. They often involve few potentially responsible parties and can be expected to have the same primary contaminants: polycyclic aromatic hydrocarbons (PAH), which are a byproduct of the gas manufacturing process, and petroleum hydrocarbons from the crude oil feedstock used to manufacture the gas.

  9. Development of a wheelchair skills home program for older adults using a participatory action design approach.

    PubMed

    Giesbrecht, Edward M; Miller, William C; Mitchell, Ian M; Woodgate, Roberta L

    2014-01-01

    Restricted mobility is the most common impairment among older adults and a manual wheelchair is often prescribed to address these limitations. However, limited access to rehabilitation services results in older adults typically receiving little or no mobility training when they receive a wheelchair. As an alternative and novel approach, we developed a therapist-monitored wheelchair skills home training program delivered via a computer tablet. To optimize efficacy and adherence, principles of self-efficacy and adult learning theory were foundational in the program design. A participatory action design approach was used to engage older adult wheelchair users, care providers, and prescribing clinicians in an iterative design and development process. A series of prototypes were fabricated and revised, based on feedback from eight stakeholder focus groups, until a final version was ready for evaluation in a clinical trial. Stakeholder contributions affirmed and enhanced the foundational theoretical principles and provided validation of the final product for the target population. PMID:25276768

  10. Data base management activities for the Remedial Action Program at ORNL, calendar year 1987

    SciTech Connect

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; McCord, R.A.; Faulkner, M.A.; Newman, K.A.; Owen, P.T.

    1988-05-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in FY 1985 to apply corrective measures at areas contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted to characterize the waste disposal sites. Environmental data collected in support of other programs at ORNL are also of use to RAP. These studies are generating a voluminous amount of data on a scale unprecedented for ORNL. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. 10 refs., 25 figs., 16 tabs.

  11. Lessons Learned for Cx PRACA. Constellation Program Problem Reporting, Analysis and Corrective Action Process and System

    NASA Technical Reports Server (NTRS)

    Kelle, Pido I.; Ratterman, Christian; Gibbs, Cecil

    2009-01-01

    This slide presentation reviews the Constellation Program Problem Reporting, Analysis and Corrective Action Process and System (Cx PRACA). The goal of the Cx PRACA is to incorporate Lessons learned from the Shuttle, ISS, and Orbiter programs by creating a single tool for managing the PRACA process, that clearly defines the scope of PRACA applicability and what must be reported, and defines the ownership and responsibility for managing the PRACA process including disposition approval authority. CxP PRACA is a process, supported by a single information gathering data module which will be integrated with a single CxP Information System, providing interoperability, import and export capability making the CxP PRACA a more effective and user friendly technical and management tool.

  12. Development of a Wheelchair Skills Home Program for Older Adults Using a Participatory Action Design Approach

    PubMed Central

    Giesbrecht, Edward M.; Miller, William C.; Mitchell, Ian M.; Woodgate, Roberta L.

    2014-01-01

    Restricted mobility is the most common impairment among older adults and a manual wheelchair is often prescribed to address these limitations. However, limited access to rehabilitation services results in older adults typically receiving little or no mobility training when they receive a wheelchair. As an alternative and novel approach, we developed a therapist-monitored wheelchair skills home training program delivered via a computer tablet. To optimize efficacy and adherence, principles of self-efficacy and adult learning theory were foundational in the program design. A participatory action design approach was used to engage older adult wheelchair users, care providers, and prescribing clinicians in an iterative design and development process. A series of prototypes were fabricated and revised, based on feedback from eight stakeholder focus groups, until a final version was ready for evaluation in a clinical trial. Stakeholder contributions affirmed and enhanced the foundational theoretical principles and provided validation of the final product for the target population. PMID:25276768

  13. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken; Gillespie, Joey; Widdop, Michael

    2012-07-01

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE

  14. Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement

    SciTech Connect

    Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

    1983-03-01

    Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

  15. Data base management activities for the Remedial Action Program at ORNL: Calendar year 1988

    SciTech Connect

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; McCord, R.A.; Faulkner, M.A.; Bledsoe, J.L.; Newman, K.A.; Owen, P.T.; Rosen, A.E.

    1989-04-01

    The ORNL Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations mandating corrective actions at contaminated sites. To achieve this goal, numerous and varied studies are being conducted to characterize the type and extent of contamination. Environmental data collected in support of other programs at ORNL are also of use to RAP. Collectively, these studies are generating a voluminous amount of data. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current DIMS and its role in supporting RAP during 1988 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on a description of the contents of the Numeric Data Base. The types of numeric data currently available are summarized in the tables and figures. More detailed information on the contents of the RAP Numeric Data Base has been assembled in a menu-driven format on IBM PC diskettes, which are available upon request. 6 refs.

  16. The Positive Action Program: Improving Academics, Behavior, and Character by Teaching Comprehensive Skills for Successful Learning and Living

    ERIC Educational Resources Information Center

    Flay, Brian R.; Allred, Carol G.

    2010-01-01

    This chapter outlines and provides evidence for the effects of the "Positive Action Program" as a way of inculcating values, driving student wellbeing, and improving academic performance and interpersonal behavior. The program centers on addressing behavioral, emotional, and academic problems by developing in individuals positive beliefs…

  17. Theory in the Service of Practice: Theories in Action Research Dissertations Written by Students in Education Doctorate Programs

    ERIC Educational Resources Information Center

    Zambo, Debby

    2014-01-01

    Educational leaders are enrolling in second-generation education doctorate (EdD) programs because these are allowing them to remain in the field as they pursue their degree and perform action research within their workplace. As part of degree requirements, students in these programs are challenged to cross the theory-to-practice divide. However,…

  18. An Exploration of Significant Leadership Development Factors in Action Learning: A Comparison of Three Action Learning Programs

    ERIC Educational Resources Information Center

    Cowan, Chris Allen

    2013-01-01

    As the need for new leaders has increased, so has the need for new and more effective forms of leadership development (Hamel, 2007; Lojeski, 2010; Gratton, 2011). Action learning has been popularized as one of these new forms of leadership development (Peters & Smith, 1998; Byrnes, 2005; ASTD, 2008; Trehan & Pedler, 2011). However,…

  19. Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.

    SciTech Connect

    Myra, David; Ready, Carol A.

    2003-04-01

    This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage

  20. Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

    SciTech Connect

    Brown, S.H.

    2008-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at

  1. Data and Information Management System for the ORNL Remedial Action Program

    SciTech Connect

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; Owen, P.T.; Newman, K.A.; McCord, R.A.; Faulkner, M.A.; Bledsoe, J.L.

    1988-01-01

    A Remedial Action Program (RAP) was established in FY 1985 at Oak Ridge National Laboratory (ORNL) to provide corrective measures at areas contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted to characterize the waste disposal sites. Environmental data collected in support of other programs at ORNL are also of use to RAP. Collectively, these studies are generating a voluminous amount of data on a scale unprecedented for ORNL. A computerized Data and Information Management System (DIMS) was developed to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated sites and facilities. The current DIMS and its role in supporting RAP are described. The DIMS consists of three components: (1) the Bibliographic Data Base, (2) the Records Control Data Base, and (3) the Numeric Data Base. This paper/poster emphasizes the Numeric Data Base, including its development and organization, and also summarizes the status of other activities associated with management and use of such data (i.e., bibliographic information, records control, geographic information, and quality assurance). The types of data currently available have been summarized, and a synopsis of the contents of the RAP numeric data base has been compiled in a menu-driven program available on PC diskettes. The synopsis will be demonstrated at the conference. 4 refs., 5 figs.

  2. Evaluating an Action Threshold-Based Insecticide Program on Onion Cultivars Varying in Resistance to Onion Thrips (Thysanoptera: Thripidae).

    PubMed

    Nault, Brian A; Huseth, Anders S

    2016-08-01

    Onion thrips, Thrips tabaci Lindeman (Thysanoptera: Thripidae), is a highly destructive pest of onion, Allium cepa L., and its management relies on multiple applications of foliar insecticides. Development of insecticide resistance is common in T. tabaci populations, and new strategies are needed to relax existing levels of insecticide use, but still provide protection against T. tabaci without compromising marketable onion yield. An action threshold-based insecticide program combined with or without a thrips-resistant onion cultivar was investigated as an improved approach for managing T. tabaci infestations in commercial onion fields. Regardless of cultivar type, the average number of insecticide applications needed to manage T. tabaci infestations in the action-threshold based program was 4.3, while the average number of sprays in the standard weekly program was 7.2 (a 40% reduction). The mean percent reduction in numbers of applications following the action threshold treatment in the thrips-resistant onion cultivar, 'Advantage', was 46.7% (range 40-50%) compared with the standard program, whereas the percentage reduction in applications in action threshold treatments in the thrips-susceptible onion cultivar, 'Santana', was 34.3% (range 13-50%) compared with the standard program, suggesting a benefit of the thrips-resistant cultivar. Marketable bulb yields for both 'Advantage' and 'Santana' in the action threshold-based program were nearly identical to those in the standard program, indicating that commercially acceptable bulb yields will be generated with fewer insecticide sprays following an action threshold-based program, saving money, time and benefiting the environment. PMID:27329626

  3. Evaluating an Action Threshold-Based Insecticide Program on Onion Cultivars Varying in Resistance to Onion Thrips (Thysanoptera: Thripidae).

    PubMed

    Nault, Brian A; Huseth, Anders S

    2016-08-01

    Onion thrips, Thrips tabaci Lindeman (Thysanoptera: Thripidae), is a highly destructive pest of onion, Allium cepa L., and its management relies on multiple applications of foliar insecticides. Development of insecticide resistance is common in T. tabaci populations, and new strategies are needed to relax existing levels of insecticide use, but still provide protection against T. tabaci without compromising marketable onion yield. An action threshold-based insecticide program combined with or without a thrips-resistant onion cultivar was investigated as an improved approach for managing T. tabaci infestations in commercial onion fields. Regardless of cultivar type, the average number of insecticide applications needed to manage T. tabaci infestations in the action-threshold based program was 4.3, while the average number of sprays in the standard weekly program was 7.2 (a 40% reduction). The mean percent reduction in numbers of applications following the action threshold treatment in the thrips-resistant onion cultivar, 'Advantage', was 46.7% (range 40-50%) compared with the standard program, whereas the percentage reduction in applications in action threshold treatments in the thrips-susceptible onion cultivar, 'Santana', was 34.3% (range 13-50%) compared with the standard program, suggesting a benefit of the thrips-resistant cultivar. Marketable bulb yields for both 'Advantage' and 'Santana' in the action threshold-based program were nearly identical to those in the standard program, indicating that commercially acceptable bulb yields will be generated with fewer insecticide sprays following an action threshold-based program, saving money, time and benefiting the environment.

  4. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken; Gillespie, Joey; Widdop, Michael; none,

    2012-02-26

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

  5. Reasoning and Action: Implementation of a Decision-Making Program in Sport.

    PubMed

    Gil-Arias, Alexander; Moreno, M Perla; García-Mas, Alex; Moreno, Alberto; García-González, Luíz; Del Villar, Fernando

    2016-01-01

    The objective of this study was to apply a decision training programme, based on the use of video-feedback and questioning, in real game time, in order to improve decision-making in volleyball attack actions. A three-phase quasi-experimental design was implemented: Phase A (pre-test), Phase B (Intervention) and Phase C (Retention). The sample was made up of 8 female Under-16 volleyball players, who were divided into two groups: experimental group (n = 4) and control group (n = 4). The independent variable was the decision training program, which was applied for 11 weeks in a training context, more specifically in a 6x6 game situation. The player had to analyze the reasons and causes of the decision taken. The dependent variable was decision-making, which was assessed based on systematic observation, using the "Game Performance Assessment Instrument" (GPAI) (Oslin, Mitchell, & Griffin, 1998). Results showed that, after applying the decision training program, the experimental group showed a significantly higher average percentage of successful decisions than the control group F(1, 6) = 11.26; p = .015; η2 p = .652; 95% CI [056, 360]. These results highlight the need to complement the training process with cognitive tools such as video-feedback and questioning in order to improve athletes' decision-making. PMID:27644584

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    SciTech Connect

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  7. Uranium Mill Tailings Remedial Action 1993 Roadmap

    SciTech Connect

    Not Available

    1993-10-18

    The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ``Lack of sufficient human resources,`` remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0.

  8. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  9. Literacy in Action: A Carbon-Neutral Field Program at Cornell University

    NASA Astrophysics Data System (ADS)

    Moore, A.; Derry, L.

    2010-12-01

    The Cornell Earth and Environmental Systems (EES) Field Program is a semester-length undergraduate field program located on the island of Hawai`i. The Hawaiian Islands are the world’s most dynamic natural laboratory and the premier location for Earth systems research and education. While there are compelling reasons for students and faculty to travel from the US mainland to Hawai`i, the air and ground travel that comprises the program carries a large carbon footprint. This liability is also an extraordinary educational opportunity. For the past two years EES students have been challenged to make the program carbon-neutral. They are asked to devise a set of criteria for a credible and defensible zero-CO2 footprint and then to put their plan into action. The C-neutral project consists of three elements: (1) quantifying CO2 emissions, (2) reducing emissions wherever possible, and (3) offsetting emissions that cannot be eliminated. In quantifying emissions six areas are identified: air travel, ground travel, domestic electricity, natural gas, food, and waste. Emissions reductions include all of the standard “carpool--turn it down--turn it off “ conservation behaviors, with special emphasis on food and waste; eating local and organic, shopping at re-use centers, and compost and recycling of garbage. Our program facility utilizes solar hot water and is equipped with neither heat nor air conditioning, thus domestic energy use is low. Students tabulate all of our energy use and calculate the resulting CO2 emissions for all program participants for a period of four months. The CO2 offsetting strategy is conducted in collaboration with a native ecosystem restoration project. Students participate in all aspects of forest restoration, including seed collection, germination and outplanting of native plant species and removal of invasive pest species. The initial goal of this locally-supported project was to restore degraded pasture to native forest. The EES students have

  10. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    SciTech Connect

    2003-04-23

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  11. Flexible and Inexpensive: Improving Learning Transfer and Program Evaluation through Participant Action Plans

    ERIC Educational Resources Information Center

    Cowan, Chris A.; Goldman, Ellen F.; Hook, Melissa

    2010-01-01

    Action plans have been shown to improve transfer of learning and have proven an effective tool in training evaluation. This study describes how action planning was simply and successfully adapted to a preexisting curriculum with few additional resources. The decision to use participant action planning, the administration of it, and the…

  12. Faculty Conceptions and Practices of Action Research in the NOVA Program.

    ERIC Educational Resources Information Center

    Raudenheimer, Carol Dianne

    This study examined approaches to action research held by science, education, and mathematics faculty and how they convert ideas to action research proposals and plan to gather and analyze their research data. The study also described some of the research outcomes of successful action research projects. Rubrics were used on a diverse set of…

  13. Photovoice as Participatory Action Research Tool for Engaging People with Intellectual Disabilities in Research and Program Development

    ERIC Educational Resources Information Center

    Jurkowski, Janine M.

    2008-01-01

    People with intellectual disabilities have few opportunities to actively participate in research affecting programs and policies. Employment of participatory action research has been recommended. Although use of this approach with people who have intellectual disabilities is growing, articles on specific participatory research methods are rare.…

  14. Give Water a Hand. Leader Guidebook. Youth Action Program. Promoting Good Water Management Practices at Home and in the Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Educators of students grades 4-8 can use this guide to lead a community service project using the "Give Water a Hand" youth action program. Youth groups investigate water and water conservation within the home, farm, ranch, school, or community, with the help of local experts. The guide contains six chapters that cover: (1) an introduction to the…

  15. Action for Children's Television; The First National Symposium on the Effect on Children of Television Programming and Advertising.

    ERIC Educational Resources Information Center

    Sarson, Evelyn, Comp.

    Action for Children's Television (ACT) was organized to attempt to change the nature of television (TV) for children--to persuade TV networks that children are not miniature consumers, to encourage appropriate programming for children, and to eliminate commercialism. This report of the First National Symposium of ACT presents papers of…

  16. An Action Dependent Heuristic Dynamic Programming-controlled Superconducting Magnetic Energy Storage for Transient Stability Augmentation

    NASA Astrophysics Data System (ADS)

    Wang, Xinpu; Yang, Jun; Zhang, Xiaodong; Yu, Xiaopeng

    To enhance the stability of power system, the active power and reactive power can be absorbed from or released to Superconducting magnetic energy storage (SMES) unit according to system power requirements. This paper proposes a control strategy based on action dependent heuristic dynamic programing (ADHDP) which can control SMES to improve the stability of electric power system with on-line learning ability. Based on back propagation (BP) neural network, ADHDP approximates the optimal control solution of nonlinear system through iteration step by step. This on-line learning ability improves its performance by learning from its own mistakes through reinforcement signal from external environment, so that it can adjust the neural network weights according to the back propagation error to achieve optimal control performance. To investigate the effectiveness of the proposed control strategy, simulation tests are carried out in Matlab/Simulink. And a conventional Proportional-Integral (PI) controlled method is used to compare the performance of ADHDP. Simulation results show that the proposed controller demonstrates superior damping performance on power system oscillation caused by three-phase fault and wind power fluctuation over the PI controller.

  17. Determination of ecologically vital groundwaters at selected sites in the Formerly Utilized Sites Remedial Action Program

    SciTech Connect

    Vinikour, W.S.; Yin, S.C.L.

    1989-08-01

    The US Department of Energy is classifying groundwaters at sites in its Formerly Utilized Sites Remedial Action Program (FUSRAP). Of particular concern is the potential presence of groundwaters that are highly vulnerable to contamination and that are either (1) irreplaceable sources of drinking water or (2) ecologically vital. Conditions at nine FUSRAP sites were evaluated to determine if ecologically vital groundwaters are present. The sites evaluated were Wayne Interim Storage Site, Maywood Interim Storage Site, and Middlesex Sampling Plant in New Jersey; Ashland 2 Site, Seaway Industrial Park, Colonie Interim storage Site, and Niagara Falls Storage Site in New York; and the St. Louis Airport Site and Hazelwood Interim Storage Site in Missouri. The analyses indicated that groundwaters are vulnerable to contamination at all but two of the sites -- the Ashland 2 and Seaway Industrial Park sites in New York. Groundwater discharge points were identified within a 2-mile radius (i.e., the classification review area) of all of the sites. No ecologically vital groundwater areas exist in the vicinities of any of the nine FUSRAP sites evaluated. 35 refs., 17 figs.

  18. HANFORD TANK FARM RESOURCE CONVERVATION & RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    SciTech Connect

    KRISTOFZSKI, J.G.

    2007-01-15

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper.

  19. Data base management activities for the Remedial Action Program at Oak Ridge National Laboratories (ORNL)

    SciTech Connect

    Hook, L.A.; Voorhees, L.D.; Gentry, M.J.; Faulkner, M.A.; Shaakir-Ali, J.A.; Newman, K.A.; McCord, R.A.; Goins, L.F.; Owen, P.T.

    1990-07-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations requiring comprehensive control over facility discharges and cleanup of contaminated sites. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current status of DIMS and its role in supporting RAP during 1989 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on the contents of the Numeric Data Base. Significant progress was made last year with the geographic information system (GIS) and ARC/INFO, which can be interfaced with SAS/GRAPH to provide combined mapping and statistical graphic products. Several thematic layers of GIS data for the Oak Ridge Reservation are now available. 18 refs., 8 figs., 19 tabs.

  20. Laser ablation ICP-mass spectrometry determination of Th{sup 230} in soils at the Gunnison, Colorado UMTRA site

    SciTech Connect

    Anderson, M.S.; Braymen, S.; McIntosh, R.

    1994-02-16

    This report describes an innovative technology, laser ablation-inductively couple plasma-mass spectrometry (LA-ICP-MS), operated in a mobile laboratory, to rapidly detect thorium 230 activity levels in soil samples. This technology was demonstrated on-site during November 1993 at the Gunnison, Colorado, UMTRA project site in support of their remediation effort. The LA-ICP-MS sampling and analysis technique was chosen because of the capability for rapid analysis, approximately three samples per hour, with minimal sample preparation.

  1. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  2. A randomized trial of the Positive Thoughts and Action program for depression among early adolescents.

    PubMed

    McCarty, Carolyn A; Violette, Heather D; Duong, Mylien T; Cruz, Rick A; McCauley, Elizabeth

    2013-01-01

    This study was conducted to compare the outcomes of a group-based cognitive-behavioral preventive intervention (Positive Thoughts and Actions [PTA]) tailored to youth in middle school with a brief, individually administered supportive intervention (Individual Support Program [ISP]). A randomized, controlled trial was conducted with 120 early adolescents (72 girls, 48 boys; age = 11-15 years) who had elevated depressive symptoms and were selected from a school-based population. Measures of internalizing problems, externalizing problems, personal adjustment, school problems, and interpersonal relations were obtained from parents, youth, and/or teachers at preintervention (Time 1) and postintervention (Time 2, 5-7 months after preintervention). General linear model repeated measures analyses yielded a significant Group × Time interaction on youth-reported, but not parent-reported, depressive symptoms and internalizing symptoms. Youth in the PTA group showed greater decreases following intervention compared to youth who received ISP, yielding effect sizes (Cohen's d) of 0.36 for depressive symptoms, 95% CI [-.02, .73], and 0.44, 95% CI [.05, .82], for internalizing symptoms. PTA youth also showed improvements in their personal adjustment (sense of inadequacy, self-esteem), and parent-reported social skills, but no differences emerged between groups for externalizing symptoms, school problems, or interpersonal relationships. Cognitive-behavioral preventive interventions in which youth engage in personal goal-setting and practice social-emotional skills, such as PTA, may be beneficial for the reduction of depressive symptoms over and above general support and empathy. PMID:23560384

  3. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    ERIC Educational Resources Information Center

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  4. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  5. Education for Action: Undergraduate and Graduate Programs That Focus on Social Change. Fourth Edition.

    ERIC Educational Resources Information Center

    Powell, Joan, Ed.

    This book provides graduates and undergraduates with detailed information about progressive programs for current and future activities in a variety of fields. Each entry contains a description of the program with faculty and program contact information. Listings include programs in agriculture, anthropology, area studies, development studies,…

  6. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  7. 77 FR 40342 - Extension of the Full First Action Interview Pilot Program and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... action, but after receiving the examiner's search results and initially identified issues. During its... providing the results of a prior art search conducted by the examiner. Since the date the pilot was...

  8. 41 CFR 60-300.44 - Required contents of affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... implementation of the contractor's affirmative action activities under this part. His or her identity should... and maintain them for a period of three (3) years: (1) The number of applicants who self-identified...

  9. 41 CFR 60-741.44 - Required contents of affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... implementation of the contractor's affirmative action activities under this part. His or her identity should... and maintain them for a period of three (3) years: (1) The number of applicants who self-identified...

  10. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  11. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  12. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  13. Options and Perspectives: A Sourcebook of Innovative Foreign Language Programs in Action, K-12.

    ERIC Educational Resources Information Center

    Love, F. William D.; Honig, Lucille J.

    This report presents information on 51 current innovative foreign language projects and programs for grades K-12. Information was collected by means of a year-long, national survey of continuing language programs, which involved announcements in journals, newsletters, and other publications; form letters to program supervisors; an ERIC search; a…

  14. Prevention in Action. 1991 Exemplary Alcohol and Other Drug Prevention Programs.

    ERIC Educational Resources Information Center

    National Association of State Alcohol and Drug Abuse Directors, Inc.

    Eight exemplary programs for preventing alcohol and other drug abuse are presented in this document. These programs are summarized: (1) SUPER II Early Intervention Program, Atlanta, Georgia, which serves primarily inner-city youth ages 11-17 and their families through community agencies, juvenile courts, alternative schools, and public housing;…

  15. Exercise in clinical cancer care: a call to action and program development description

    PubMed Central

    Santa Mina, D.; Alibhai, S.M.H.; Matthew, A.G.; Guglietti, C.L.; Steele, J.; Trachtenberg, J.; Ritvo, P.G.

    2012-01-01

    A large and convincing body of evidence demonstrates the benefits of exercise for cancer survivors during and after treatment. Based on that literature, more cancer survivors should be offered exercise support and programming. Unfortunately, exercise programs remain an exception rather than the norm in cancer care. Not surprisingly, common barriers to the implementation of exercise programs in oncology include limited resources, expertise, and awareness of benefits on the part of patients and clinicians. To improve the accessibility and cost-effectiveness of cancer exercise programs, one proposed strategy is to combine the resources of hospital and community-based programs with home-based exercise instruction. The present paper highlights current literature regarding exercise programming for cancer survivors, describes the development of an exercise program for cancer patients in Toronto, Canada, and offers experiential insights into the integration of exercise into oncologic care. PMID:22670103

  16. Modularity and hierarchical organization of action programs in children's acquisition of graphic skills.

    PubMed

    Manoel, Edison de J; Dantas, Luiz; Gimenez, Roberto; de Oliveira, Dalton Lustosa

    2011-10-01

    The organization of actions is based on modules in memory as a result of practice, easing the demand of performing more complex actions. If this modularization occurs, the elements of the module must remain invariant in new tasks. To test this hypothesis, 35 children, age 10 yr., practiced a graphic criterion task on a digital tablet and completed a complex graphic task enclosing the previous one. Total movement and pause times to draw the figure indicated skill acquisition. A module was identified by the variability of relative timing, pause time, and sequencing. Total movement to perform the criterion task did not increase significantly when it was embedded in the more complex task. Modularity was evidenced by the stability of relative timing and pause time and sequencing. The spatial position of new elements did not perturb the module, so the grammar of action may still have been forming.

  17. Insights from Smart Meters. Identifying Specific Actions, Behaviors and Characteristics that drive savings in Behavior-Based Programs

    SciTech Connect

    Todd, Annika; Perry, Michael; Smith, Brian; Sullivan, Michael; Cappers, Peter; Goldman, Charles A.

    2014-12-01

    In this report, we use smart meter data to analyze specific actions, behaviors, and characteristics that drive energy savings in a behavior-based (BB) program. Specifically, we examine a Home Energy Report (HER) program. These programs typically obtain 1% to 3% annual savings, and recent studies have shown hourly savings of between 0.5% and 3%. But what is driving these savings? What types of households tend to be “high-savers”, and what behaviors are they adopting? There are several possibilities: one-time behaviors (e.g., changing thermostat settings); reoccurring habitual behaviors (e.g., turning off lights); and equipment purchase behaviors (e.g., energy efficient appliances), and these may vary across households, regions, and over time.

  18. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    SciTech Connect

    Not Available

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  19. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  20. Principles to Actions: Mathematics Programs as the Core for Student Learning

    ERIC Educational Resources Information Center

    Brahier, Daniel; Leinwand, Steve; Huniker, DeAnn

    2014-01-01

    The National Council of Teachers of Mathematics (NCTM) launched the "standards-based" education movement in North America in 1989 with the release of "Curriculum and Evaluation Standards for School Mathematics," an unprecedented action to promote systemic improvement in mathematics education. Now, twenty-five years later, the…

  1. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to ensure the protection of human health and the environment. Interim measures should, to the... sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial action is not... threats to human health and the environment. (b) An owner or operator may determine, based on...

  2. Assessing a Controversial In-Service Program: An Action Research Approach.

    ERIC Educational Resources Information Center

    Kapel, David E.

    A course was prepared by Planned Parenthood on the subject of human sexuality. The school district required an evaluation to determine effects, assess whether the instructional agency should be invited back, and to determine whether experiences should be continued. An action research approach was deemed appropriate. The objectives of the research…

  3. Influence of a Parent Leadership Program on Participants' Leadership Capacity and Actions

    ERIC Educational Resources Information Center

    Cunningham, Shayna D.; Kreider, Holly; Ocon, Jenny

    2012-01-01

    This article investigates the influence of Parent Services Project's Vision and Voice Family Leadership Institute (VVFLI; formerly known as Parent Leadership Institute) on parent leadership capacity and action. Pre- and post-test data were collected from new VVFLI attendees during their first (N = 83) and last (N = 85) session, respectively.…

  4. 41 CFR 60-300.40 - Applicability of the affirmative action program requirement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FEDERAL CONTRACTORS AND SUBCONTRACTORS REGARDING DISABLED VETERANS, RECENTLY SEPARATED VETERANS, ACTIVE DUTY WARTIME OR CAMPAIGN BADGE VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action...,000 or more. (b) Contractors described in paragraph (a) of this section shall, within 120 days of...

  5. Recycling: Special Lesson Plans for Civic Achievement Award Program and CAAP in Action Teachers.

    ERIC Educational Resources Information Center

    Close Up Foundation, Arlington, VA.

    These lesson plans are designed to help fifth- through eighth-grade students learn about recycling, and to help them understand that recycling is one important environmental action citizens can take. The lesson plans are composed of objectives, homework assignments, main activities, and enrichment activities. (DB)

  6. Effects of the "Positive Action" Program on Indicators of Positive Youth Development among Urban Youth

    ERIC Educational Resources Information Center

    Lewis, Kendra M.; Vuchinich, Samuel; Ji, Peter; DuBois, David L.; Acock, Alan; Bavarian, Niloofar; Day, Joseph; Silverthorn, Naida; Flay, Brian R.

    2016-01-01

    This study evaluated effects of "Positive Action," a school-based social-emotional and character development intervention, on indicators of positive youth development (PYD) among a sample of low-income, ethnic minority youth attending 14 urban schools. The study used a matched-pair, cluster-randomized controlled design at the school…

  7. Action Research as Signature Pedagogy in an Education Doctorate Program: The Reality and Hope

    ERIC Educational Resources Information Center

    Zambo, Debby

    2011-01-01

    Debates about the education doctorate continue; and, while some individuals focus on the problematic, others work to distinguish this degree from the Ph.D. The author is part of the latter, and in this article I explain how faculty members at one university are using action research as a signature pedagogy to create stewards of practice, that is,…

  8. Understanding Teacher Effectiveness: Providing Feedback to Teacher Preparation Programs. Data for Action 2013

    ERIC Educational Resources Information Center

    Data Quality Campaign, 2014

    2014-01-01

    Teachers need longitudinal student-level data, such as attendance history, course-taking patterns, grades, and test scores, to tailor instruction to individual students' strengths and weaknesses.This factsheet uses the findings from the Data for Action 2013 analysis to discuss how states can provide teachers with student-level longitudinal data,…

  9. 41 CFR 60-741.44 - Required contents of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish meaningful contacts with appropriate social service agencies, organizations of and for individuals... in the company newspaper, magazine, annual report and other media. (iv) Conduct special meetings with..., recreational and social activities. (v) Measure the contractor's compliance with the affirmative action...

  10. Scaffolding Strategies for Wiki-Based Collaboration: Action Research in a Multicultural Japanese Language Program

    ERIC Educational Resources Information Center

    Jung, Insung; Suzuki, Yoko

    2015-01-01

    Wikis can be used to encourage and support collaborative constructivist learning. However, their effectiveness depends upon the use of scaffolding strategies to guide the students in their use. This action research investigated three scaffolding strategies for wiki-based multicultural Japanese language learning: worked examples, grouping and peer…

  11. Engagement Theory in Action: An Investigation of Athletic Training Program Directors

    ERIC Educational Resources Information Center

    Peer, Kimberly S.

    2007-01-01

    Objective: To examine the use of good practice indicators by athletic training program directors and to provide a theoretical framework using engagement theory, a learner-centered process focusing on program improvement through continuous planning and evaluation, as a foundation for implementing good practices in athletic training education…

  12. Actions Underway to Reduce Delinquencies in the Health Professions and Nursing Student Loan Programs.

    ERIC Educational Resources Information Center

    Comptroller General of the U.S., Washington, DC.

    The problem of loan payment delinquency in the Health Professions and Nursing Student Loan Programs was reviewed. Problems that schools have had in billing and collecting outstanding loans and the lack of effective program monitoring by the Department of Health and Human Services (DHHS) were assessed, along with the DHHS' efforts to correct the…

  13. Afterschool in Action: How Innovative Afterschool Programs Address Critical Issues Facing Middle School Youth

    ERIC Educational Resources Information Center

    Afterschool Alliance, 2012

    2012-01-01

    Over the last four years, the Afterschool Alliance and MetLife Foundation have worked together to identify exemplary, and often lesser-known afterschool programs across the nation. For the past two years, efforts have focused on finding innovative afterschool programs serving middle school students. This focus was developed to address the need for…

  14. Toward a National Program for Library and Information Services: Goals for Action. A Summary.

    ERIC Educational Resources Information Center

    National Commission on Libraries and Information Science, Washington, DC.

    This summary of the deliberations and proposals of the National Commission on Libraries and Information Science includes brief discussions of programs goals, a needs analysis, and the concerns of both libraries and the private sector. Recommendations for a national program are presented as eight priority objectives, and various facets of the…

  15. Toward a National Program for Library and Information Services: Goals for Action.

    ERIC Educational Resources Information Center

    National Commission on Libraries and Information Science, Washington, DC. National Program for Library and Information Services.

    The National Commission on Libraries and Information Science (NCLIS) presents its goals and plans for a national program of library and information services with the intention of satisfying the nation's information needs to the greatest extent possible. The basic needs and rationale for a national program are stated, and a survey is made of the…

  16. An Overview of an Issue and Action Instruction Program for Stewardship Education.

    ERIC Educational Resources Information Center

    Marcinkowski, Tom

    The purpose of this paper is to summarize an issue instruction environmental education program developed by Harold Hungerford and his associates over the past three decades. The primary focus of the issue instruction program is on the development and application of investigation and evaluation skills to environmental problems and issues. Program…

  17. Issues around Teaching Competencies in a Family Literacy Program. Action Research Monograph.

    ERIC Educational Resources Information Center

    Miller, Susan Finn

    Issues surrounding teaching competencies in family literacy programs were examined in a study of two well-established Even Start sites in Lancaster County, Pennsylvania. The program, which served 34 ethnically diverse adult learners, offered 25 hours of adult basic education, general educational development (GED), and…

  18. Understanding Teacher Effectiveness: Providing Feedback to Teacher Preparation Programs. Data for Action 2014

    ERIC Educational Resources Information Center

    Data Quality Campaign, 2014

    2014-01-01

    State leaders are increasingly focused on improving college and university programs that prepare teachers as a route to a high-quality teacher workforce. This work requires significant data capacity to reliably and securely link teachers with their students' achievement and growth data with the state's teacher preparation programs. This fact sheet…

  19. Evaluating the Implementation of a Training Program for Improving Quality Service: An Action Research Study

    ERIC Educational Resources Information Center

    Pierre, Ketly Dieudonne

    2014-01-01

    There is a need to implement a comprehensive training program to build employees' knowledge, skills, and attitudes in order to improve quality service at ABC Restaurant because of a surge in customer complaints. The purpose of this study was to develop a training program that included an employee handbook as a training tool, a handbook designed…

  20. Equal Employment Opportunity Affirmative Action Program Plan: Fiscal year 1986, Accomplishment report of affirmative action for minorities and women: Fiscal year 1987, Annual update of Affirmative Action Program for minorities and women

    SciTech Connect

    Not Available

    1986-01-01

    This document contains tables of changes in work force EEO profile by PATCO and pay level, distribution of EEO groups and underpresentation indices, combined hiring and internal movements, barrier eliminations, and recruitment program. (DLC)

  1. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    SciTech Connect

    Not Available

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  2. Action Learning.

    ERIC Educational Resources Information Center

    1996

    These four papers were presented at a symposium on action learning moderated by Lex Dilworth at the 1996 conference of the Academy of Human Resource Development. "Developing an Infrastructure for Individual and Organizational Change: Transfer of Learning from an Action Reflection Learning (ARL) Program" (ARL Inquiry) reports findings from a study…

  3. Understanding attitudes toward affirmative action programs in employment: summary and meta-analysis of 35 years of research.

    PubMed

    Harrison, David A; Kravitz, David A; Mayer, David M; Leslie, Lisa M; Lev-Arey, Dalit

    2006-09-01

    Affirmative action programs (AAPs) are controversial employment policies in the United States and elsewhere. A large body of evidence about attitudinal reactions to AAPs in employment has accumulated over 35 years: at least 126 independent samples involving 29,000 people. However, findings are not firmly established or integrated. In the current article, the authors summarize and meta-analytically estimate relationships of AAP attitudes with (a) structural features of such programs, (b) perceiver demographic and psychological characteristics, (c) interactions of structural features with perceiver characteristics, and (d) presentation of AAP details to perceivers, including justification of the AAP. Results are generally consistent with predictions derived from self-interest considerations, organizational justice theory, and racism theories. They also suggest practical ways in which AAPs might be designed and communicated to employees to reduce attitudinal resistance.

  4. Understanding attitudes toward affirmative action programs in employment: summary and meta-analysis of 35 years of research.

    PubMed

    Harrison, David A; Kravitz, David A; Mayer, David M; Leslie, Lisa M; Lev-Arey, Dalit

    2006-09-01

    Affirmative action programs (AAPs) are controversial employment policies in the United States and elsewhere. A large body of evidence about attitudinal reactions to AAPs in employment has accumulated over 35 years: at least 126 independent samples involving 29,000 people. However, findings are not firmly established or integrated. In the current article, the authors summarize and meta-analytically estimate relationships of AAP attitudes with (a) structural features of such programs, (b) perceiver demographic and psychological characteristics, (c) interactions of structural features with perceiver characteristics, and (d) presentation of AAP details to perceivers, including justification of the AAP. Results are generally consistent with predictions derived from self-interest considerations, organizational justice theory, and racism theories. They also suggest practical ways in which AAPs might be designed and communicated to employees to reduce attitudinal resistance. PMID:16953765

  5. Maywood Interim Storage Site: Annual site environmental report, Maywood, New Jersey, Calendar year 1986: Formerly Utilized Sites Remedial Action Program

    SciTech Connect

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. The MISS is presently used for the storage of low-level radioactively contaminated soils. The MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring programs are being conducted at this site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/y) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/y. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (due to greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 16 refs., 8 figs., 15 tabs.

  6. Follow-up for the ICPD Program of Action. Sadik outlines achievements of Cairo and urges follow-up of program's recommendations.

    PubMed

    Sadik, N

    1995-01-01

    At a meeting in Tokyo on October 27, 1994, Dr. Nafis Sadik, executive director of the United Nations Population Fund, reviewed the achievements of the International Conference on Population and Development (ICPD) held in Cairo, Egypt, in September 1994. The meeting was attended by some 200 population experts, parliamentarians, government officials, representatives of nongovernmental organizations (NGOs), and the media. The ICPD adopted a new Program of Action for the next 20 years. The international community has acknowledged that investing in people, in their health and education, is the key to sustainable development. An important focus of ICPD was the need to include the empowerment of women in the formulation of national and international population and development policies to improve the quality of life for everyone. The program recognizes the need to integrate family planning (FP) activities into the wider context of reproductive health. Reproductive health care programs should be designed to serve the needs of women and men, including adolescents, and must involve women in the leadership, planning, decision-making, management, implementation, organization, and evaluation of services. The program recognizes the reproductive rights and reproductive health needs of adolescents in terms of information and services that help them make responsible decisions. NGOs in developed and developing countries alike have a crucial role to play in the provision of reproductive health-care information and services. NGOs in donor countries like Japan can press their governments to fulfill their commitments made at ICPD. Many Japanese NGOs, particularly JOICFP and Japan's Network for Women's Health, Cairo '94, have played an important role in mobilizing support for the goals of the ICPD. The significance of the ICPD will now depend on the willingness of governments, local communities, the NGO sector, the international community, and all other concerned organizations and

  7. National Breast and Cervical Cancer Early Detection Program partnerships in action.

    PubMed

    Sanders, Latasha D; Larkins, Teri L; Boyle, John N; George, Susan F; Triplett, Erin W; Leypoldt, Melissa D

    2014-08-15

    Since the inception of the Centers for Disease Control and Prevention (CDC) National Breast and Cervical Cancer Early Detection Program (NBCCEDP) in 1990, partnerships have played a significant role in providing breast and cervical cancer screening and early detection to uninsured and underinsured women. The state, tribal, and territorial NBCCEDP grantees have shared resources and responsibilities with a variety of partners (eg, community-based organizations, government agencies, tribes, health care systems, companies, professional organizations) to achieve common goals. National partners, such as the American Cancer Society, Susan G. Komen for the Cure, and the Avon Foundation for Women, have provided funding, lobbied for national and state funding, supported outreach and education activities, and provided treatment referral services for the programs. This article provides an overview of grantee partnerships to illustrate the effects, successes, and challenges of these partnerships and how they have affected the populations served by the program.

  8. Evaluating a healthy eating, healthy action program in small Mãori communities in Aotearoa, New Zealand.

    PubMed

    Mercer, Christine; Riini, Denise; Hamerton, Heather; Morrison, Laurie; McPherson, Brighid

    2013-01-01

    Evidence from health surveys have identified that Māori, the indigenous people of Aotearoa New Zealand, experience a high incidence of obesity with physical and social implications. In 2000, the New Zealand Government introduced a strategy aimed, among other objectives, at improving nutrition, increasing physical activity and reducing obesity through a 'Healthy Eating Health Action' (HEHA) strategy. As part of the HEHA strategy, a Māori primary health organisation (PHO) in a regional centre of Aotearoa, New Zealand, developed a program aimed at improving the health of the local Māori communities. The program, called Project REPLACE, invited participants to gradually change their behaviour by replacing behaviours potentially detrimental to health with a healthier alternative. Between 2009 and 2010 a team of researchers evaluated the program, taking care to use Māori approaches when conducting the research. The findings from the evaluation were that each community was innovative in their approaches to implementing Project REPLACE, drawing on their culture to combine healthy eating with increased exercise activities as well as measurements of achievement. The relationship that each coordinator had with the community was pivotal to the success of the program. Project REPLACE highlighted the importance of Māori ownership and control of health initiatives.

  9. Education for Action. Undergraduate and Graduate Programs That Focus on Social Change. Expanded Third Edition.

    ERIC Educational Resources Information Center

    Brooks, Sean, Ed.; Knowles, Alison, Ed.

    This book provides a comprehensive guide to graduate and undergraduate programs focusing on social change that are recommended by Food First, a non-profit research and education center with a mission of empowering citizens to address the root causes of hunger, poverty, and environmental decline. Listings provide the name and address of the…

  10. The Reduction of Bullying in an Elementary Program: An Action Research Study

    ERIC Educational Resources Information Center

    Brock, Jacqueline M.

    2013-01-01

    Bully Prevention in Positive Behavior Support (BP-PBS) is a prevention-oriented program created to support students with strategies to combat bullying. BP-PBS supports the idea that all students should have access to positive behavior support to minimize problem behavior at school (Horner, 2011). The goal of this study was to investigate the…

  11. Community Action, Urban Reform, and the Fight against Poverty: The Ford Foundation's Gray Areas Program.

    ERIC Educational Resources Information Center

    O'Connor, Alice

    1996-01-01

    Describes the process by which experimental Ford Foundation programs designed to stem the urban crisis evolved into more narrowly constructed interventions to reform service delivery systems and alleviate poverty in inner-city neighborhoods. Related themes are highlighted and limitations caused by problems of institutional constraints, political…

  12. A Call to Action: Addressing the Childhood Obesity Epidemic through Comprehensive School Counseling Programs

    ERIC Educational Resources Information Center

    Belser, Christopher T.; Morris, Jessica A.; Hasselbeck, Jennifer M.

    2012-01-01

    The need for school-based interventions targeting the childhood obesity epidemic has been well documented. The risk factors associated with childhood obesity are physical, mental, psychosocial, academic, and economic. With training in developing comprehensive programs and interventions, professional school counselors are positioned to assist…

  13. 19 CFR 191.194 - Action on application to participate in compliance program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... violations, and in lieu of a monetary penalty as otherwise provided under § 1593a, issue a written notice of... applicable drawback office. A denial of an appeal may itself be appealed to CBP Headquarters, Trade Policy... itself be appealed to CBP Headquarters, Trade Policy and Programs, Office of International Trade,...

  14. 19 CFR 191.194 - Action on application to participate in compliance program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... violations, and in lieu of a monetary penalty as otherwise provided under § 1593a, issue a written notice of... applicable drawback office. A denial of an appeal may itself be appealed to CBP Headquarters, Trade Policy... itself be appealed to CBP Headquarters, Trade Policy and Programs, Office of International Trade,...

  15. Innovations in Labor Market Information and Their Application: Applications for Workforce Programs. A Greenways Action Brief

    ERIC Educational Resources Information Center

    Milfort, Myriam; Kelley, Jeremy

    2012-01-01

    With funding from the Joyce and Lumina foundations, Jobs for the Future (JFF) launched Credentials that Work to help postsecondary institutions, regions, and states align their occupational training programs to changing market demands. This initiative incorporates innovations in real-time labor market information in guiding institutions to better…

  16. Effective Leadership Programs. Twelve Case Studies from the Real World of Training. In Action.

    ERIC Educational Resources Information Center

    Ashby, Franklin C., Ed.

    This book contains 13 case studies that illustrate models, techniques, theories, strategies, and issues relevant to leadership development programs in the public, private, and nonprofit sectors. The following papers are included: "The Past, Present, and Future of Leadership Development" (Franklin C. Ashby); "Leadership Development as a Business…

  17. Stanford University: The Building Energy Retrofit Programs. Green Revolving Funds in Action: Case Study Series

    ERIC Educational Resources Information Center

    Flynn, Emily

    2011-01-01

    Stanford University's Energy Retrofit Program was created in 1993 to target resource reduction and conservation focused projects on campus. Fahmida Ahmed, Associate Director of the Department of Sustainability and Energy Management, says that Stanford has been investing in sustainability and energy-efficiency since the late 1970s, longer than many…

  18. Governor Corbett's Expanding Excellence Program: A Research for Action Policy Note

    ERIC Educational Resources Information Center

    Sludden, John; Beaver, Jessica; Park, Elizabeth; Kumar, Anurag; Gao, Jian

    2014-01-01

    According to a Pennsylvania Department of Education (PDE) press release, in which the Governor outlined his budget priorities for 2014-2015, the Governor's plan includes the Expanding Excellence Program. If enacted and funded, this initiative would "provide competitive funding to schools that have attained a 90 or higher on the School…

  19. Strategies, actions, and outcomes of pilot state programs in public health genomics, 2003-2008.

    PubMed

    St Pierre, Jeanette; Bach, Janice; Duquette, Debra; Oehlke, Kristen; Nystrom, Robert; Silvey, Kerry; Zlot, Amy; Giles, Rebecca; Johnson, Jenny; Anders, H Mack; Gwinn, Marta; Bowen, Scott; Khoury, Muin J

    2014-06-12

    State health departments in Michigan, Minnesota, Oregon, and Utah explored the use of genomic information, including family health history, in chronic disease prevention programs. To support these explorations, the Office of Public Health Genomics at the Centers for Disease Control and Prevention provided cooperative agreement funds from 2003 through 2008. The 4 states' chronic disease programs identified advocates, formed partnerships, and assessed public data; they integrated genomics into existing state plans for genetics and chronic disease prevention; they developed projects focused on prevention of asthma, cancer, cardiovascular disease, diabetes, and other chronic conditions; and they created educational curricula and materials for health workers, policymakers, and the public. Each state's program was different because of the need to adapt to existing culture, infrastructure, and resources, yet all were able to enhance their chronic disease prevention programs with the use of family health history, a low-tech "genomic tool." Additional states are drawing on the experience of these 4 states to develop their own approaches.

  20. Action Plan for Communicating and Marketing the Work and Family Life Program.

    ERIC Educational Resources Information Center

    West, James S.; Hunady, Ronald J.

    This information packet is designed to help Ohio's high school and middle/junior high school teachers develop a plan to communicate and market the state's work and family life program to various constituencies (students, parents, guidance counselors, school boards, and the general public). Discussed first are the rationale for and intended results…

  1. Things Are in Action: The Discovery Program/Exploration Camps. Lunch Session.

    ERIC Educational Resources Information Center

    Amram, Raphi

    1991-01-01

    A "Discovery Program" implemented in 1989 to help underprivileged gifted and talented students in Israel advance in their chosen fields is described. The importance of local administration and participation is stressed, as are optimal ratios of underprivileged to privileged youth for maximum benefit to all. (PB)

  2. PAC-TAC. Police and Citizens-Together Against Crime. Experimental Action Program.

    ERIC Educational Resources Information Center

    Rochester Univ., NY. Management Research Center.

    This report describes an experimental program in which civilians and police officers work as two-person teams, patrolling fixed "beat" areas in selected urban neighborhoods. These teams work in responding to service calls, aiding regular mobile patrols in their duties, deterring criminal activity and civilian victimization, and developing better…

  3. Galvanizing action: conclusions and next steps for mainstreaming zinc interventions in public health programs.

    PubMed

    Brown, Kenneth H; Baker, Shawn K

    2009-03-01

    This paper summarizes the results of the foregoing reviews of the impact of different intervention strategies designed to enhance zinc nutrition, including supplementation, fortification, and dietary diversification or modification. Current evidence indicates a beneficial impact of such interventions on zinc status and zinc-related functional outcomes. Preventive zinc supplementation reduces the incidence of diarrhea and acute lower respiratory tract infection among young children, decreases mortality of children over 12 months of age, and increases growth velocity. Therapeutic zinc supplementation during episodes of diarrhea reduces the duration and severity of illness. Zinc fortification increases zinc intake and total absorbed zinc, and recent studies are beginning to confirm a positive impact of zinc fortification on indicators of population zinc status. To assist with the development of zinc intervention programs, more information is needed on the prevalence of zinc deficiency in different countries, and rigorous evaluations of the effectiveness of large-scale zinc intervention programs should be planned. Recommended steps for scaling up zinc intervention programs, with or without other micronutrients, are described. In summary, there is now clear evidence of the benefit of selected interventions to reduce the risk of zinc deficiency, and a global commitment is urgently needed to conduct systematic assessments of population zinc status and to develop interventions to control zinc deficiency in the context of existing public health and nutrition programs.

  4. An Evaluation of the Savannah Early College Program: An Action Oriented Research Approach

    ERIC Educational Resources Information Center

    Kearse, Douglas

    2013-01-01

    The Savannah Early College Program (SECP) opened its doors in August 2007 to make a difference in the lives of all students who enrolled. Its primary mission was to combine academic rigor and support to help students enter college early and graduate from high school with up to 2 years of college credit. Since SECP joined the Early College High…

  5. Lights, Camera, Action: Advancing Learning, Research, and Program Evaluation through Video Production in Educational Leadership Preparation

    ERIC Educational Resources Information Center

    Friend, Jennifer; Militello, Matthew

    2015-01-01

    This article analyzes specific uses of digital video production in the field of educational leadership preparation, advancing a three-part framework that includes the use of video in (a) teaching and learning, (b) research methods, and (c) program evaluation and service to the profession. The first category within the framework examines videos…

  6. Early Action on the Global Environmental Monitoring System. A Report of the International Environmental Programs Committee.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Environmental Studies Board.

    The Global Environmental Monitoring System (GEMS) is one of four components of Earthwatch, a part of the United Nations Environment Program (UNEP). The purpose of GEMS is to provide early warning of impending natural or man-induced environmental changes or trends that threaten direct or indirect harm to human health or well-being. In 1975, the…

  7. Volunteer Income Tax Assistance Programs and Taxpayer Actions to Improve Personal Finances

    ERIC Educational Resources Information Center

    Bobbitt, Erica; Bowen, Cathy F.; Kuleck, Robin L.; Taverno, Ronald

    2012-01-01

    The income tax-filing process creates teachable moments for learning about taxes and other financial matters. Educators and volunteers from Penn State Cooperative Extension helped taxpayers file 2008 returns under Volunteer Income Tax Assistance Program (VITA). Nearly 600 filers (588) completed and simultaneously received educational information…

  8. A Model Recycling Program: UNC Takes Action as Landfill Space Shrinks and Costs Rise.

    ERIC Educational Resources Information Center

    Sherman, Rhonda L.

    1991-01-01

    The University of North Carolina responded to escalating waste disposal costs and shrinking landfill space with a structured program of recycling, including a mobile recycling drop, student family housing recycling, a newspaper drop-off site, high-volume glass pick-up, high-volume newspaper pick-up, and cardboard recycling. Campus-wide cooperation…

  9. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado. Attachment 5, Supplemental radiological data: Final report

    SciTech Connect

    Not Available

    1992-10-01

    Diffusion coefficients for radon gas in earthen materials are required to design suitable radon-barrier covers for uranium tailings impoundments and other materials that emit radon gas. Many early measurements of radon diffusion coefficients relied on the differences in steady-state radon fluxes measured from radon source before and after installation of a cover layer of the material being tested. More recent measurements have utilized the small-sample transient (SST) technique for greater control on moistures and densities of the test soils, greater measurement precision, and reduced testing time and costs. Several of the project sites for the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Program contain radiologically contaminated subsurface material composed predominantly of cobbles, gravels andsands. Since remedial action designs require radon diffusion coefficients for the source materials as well as the cover materials, these cobbly and gravelly materials also must be tested. This report contains the following information: a description of the test materials used and the methods developed to conduct the SST radon diffusion measurements on cobbly soils; the protocol for conducting radon diffusion tests oncobbly soils; the results of measurements on the test samples; and modifications to the FITS computer code for analyzing the time-dependent radon diffusion data.

  10. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  11. The holistic worldview in action: evolution of holistic nurses certification programs.

    PubMed

    Erickson, Helen Lorraine; Erickson, Margaret Elizabeth; Sandor, M Kay; Brekke, Mary E

    2013-12-01

    The American Holistic Nurses Credentialing Corporation (AHNCC), the only national credentialing body for holistic nurses, has a responsibility to offer valid, reliable, and rigorous certification examinations and to grow and evolve as indicated by social and professional changes. This article describes four major changes in the work of AHNCC since 2004: a detection of an evolution in the domain of holistic nursing through review of the literature; clarification and specification of levels of practice by educational level; development of the nurse coach role in nursing, designed within the precepts of holistic nursing; and AHNCC's response to the social paradigm shift for health care, and nursing's advanced practice registered nurse consensus model. Each of these is discussed in detail describing the circumstances that perpetuated AHNCC's consideration and the actions taken by AHNCC.

  12. Optimization of biochemical systems by linear programming and general mass action model representations.

    PubMed

    Marín-Sanguino, Alberto; Torres, Néstor V

    2003-08-01

    A new method is proposed for the optimization of biochemical systems. The method, based on the separation of the stoichiometric and kinetic aspects of the system, follows the general approach used in the previously presented indirect optimization method (IOM) developed within biochemical systems theory. It is called GMA-IOM because it makes use of the generalized mass action (GMA) as the model system representation form. The GMA representation avoids flux aggregation and thus prevents possible stoichiometric errors. The optimization of a system is used to illustrate and compare the features, advantages and shortcomings of both versions of the IOM method as a general strategy for designing improved microbial strains of biotechnological interest. Special attention has been paid to practical problems for the actual implementation of the new proposed strategy, such as the total protein content of the engineered strain or the deviation from the original steady state and its influence on cell viability.

  13. The Listening Partners program: an initiative toward feminist community psychology in action.

    PubMed

    Bond, L A; Belenky, M F; Weinstock, J S

    2000-10-01

    The Listening Partners intervention is described and analyzed as a synthesis of feminism and community psychology, within a developmental framework. Working from an empowerment perspective, this social action, peer group intervention supported a community of poor, rural, isolated, young, White mothers to gain a greater voice, claim the powers of their minds, and collaborate in developmental leadership--creating settings that promote their own development and that of their families, peers, and communities. High quality dialogue, individual and group narrative, and collaborative problem-solving were emphasized, in a feminist context affirming diversity, inclusiveness, strengths, social-contextual analyses, and social constructivist perspectives. The power of enacting a synergy of feminism and community psychology is highlighted.

  14. [A school program for dengue control in Honduras: from knowledge to action].

    PubMed

    Avila Montes, Gustavo Adolfo; Araujo, Roxana; Leontsini, Elli; Orellana Herrera, Gabriel; Fernández Cerna, Eduardo

    2012-06-01

    The Environmental School Program (PEA, for its Spanish acronym), a dengue control initiative focused on primary schools that took place during 2005-2010 in several cities in Honduras, is described. The environmental health program was designed to increase knowledge and develop skills in the identification and control of Aedes aegypti breeding sites, as well as in water and solid waste management. The results, as measured by behavioral change and reduced larval indices, were satisfactory in the majority of the participating schools. The initiative involved not only children, but also their parents and teachers. In addition to reducing larval indices, PEA was successful in promoting community participation in environmental issues, particularly Aedes control. The inclusion of this educational content in the primary school curriculum in Honduras remains pending.

  15. Family-School-Professionals Partnerships: An Action Research Program to Enhance the Social, Emotional, and Academic Resilience of Children at Risk

    ERIC Educational Resources Information Center

    Kourkoutas, Elias; Eleftherakis, Theodoros G.; Vitalaki, Elena; Hart, Angie

    2015-01-01

    This paper presents an action research program which was designed to support parents and primary school teachers, with the mediation of school professionals in order to enable them facilitate the school inclusion of at risk students or those with special educational needs. The aims, the organization process, and the implementation of the program,…

  16. Evaluation of Jump into Action: A Program to Reduce the Risk of Non-Insulin Dependent Diabetes Mellitus in School Children on the Texas-Mexico Border.

    ERIC Educational Resources Information Center

    Holcomb, J. David; Lira, Juanita; Kingery, Paul M.; Smith, D. W.; Lane, Dorothy; Goodway, Jackie

    1998-01-01

    Evaluated Jump into Action, a non-insulin dependent diabetes mellitus (NIDDM)-prevention program that encouraged students to eat well and exercise regularly to reduce NIDDM risks. Surveys of predominantly Hispanic fifth graders and their teachers at Texas-Mexico border schools indicated that the program increased NIDDM-prevention knowledge and…

  17. Transitioning into Mathematics Curriculum Leadership: A Study of How a Graduate Degree Program Influenced Leaders' Views, Actions, and Responses

    ERIC Educational Resources Information Center

    Cummings, Liza

    2011-01-01

    The purpose of this "intrinsic multi-descriptive" case study was to explore how a mathematics curriculum leadership graduate degree program influenced seven participants' views and actions as they transitioned into new mathematics curriculum leadership roles. The mathematics curriculum leadership graduate degree program was a joint…

  18. The Earth Education Program Sunship™ Earth: A Mixed Methods Study of the Long-Term Influence on Environmental Attitudes and Actions

    ERIC Educational Resources Information Center

    Bires, Nancy K.

    2013-01-01

    There have been a limited number of studies on the short-term influence of environmental and earth education programs, however, not much information is available about the long-term influence of these programs on participants' environmental attitudes and actions. This mixed methods study explores the long-term influence of the earth education…

  19. Geothermal Program Review XII: proceedings. Geothermal Energy and the President's Climate Change Action Plan

    SciTech Connect

    Not Available

    1994-12-31

    Geothermal Program Review XII, sponsored by the Geothermal Division of US Department of Energy, was held April 25--28, 1994, in San Francisco, California. This annual conference is designed to promote effective technology transfer by bringing together DOE-sponsored researchers; utility representatives; geothermal energy developers; suppliers of geothermal goods and services; representatives from federal, state, and local agencies; and others with an interest in geothermal energy. In-depth reviews of the latest technological advancements and research results are presented during the conference with emphasis on those topics considered to have the greatest potential to impact the near-term commercial development of geothermal energy.

  20. Human salivary histatin 5 fungicidal action does not induce programmed cell death pathways in Candida albicans.

    PubMed

    Wunder, David; Dong, Jin; Baev, Didi; Edgerton, Mira

    2004-01-01

    Salivary histatins (Hsts) are potent candidacidal proteins that induce a nonlytic form of cell death in Candida albicans accompanied by loss of mean cell volume, cell cycle arrest, and elevation of intracellular levels of reactive oxygen species (ROS). Since these phenotypes are often markers of programmed cell death and apoptosis, we investigated whether other classical markers of apoptosis, including generation of intracellular ROS and protein carbonyl groups, chromosomal fragmentation (laddering), and cytochrome c release, are found in Hst 5-mediated cell death. Increased intracellular levels of ROS in C. albicans were detected in cells both following exogenous application of Hst 5 and following intracellular expression of Hst 5. However, Western blot analysis failed to detect specifically increased protein carbonylation in Hst 5-treated cells. There was no evidence of chromosomal laddering and no cytochrome c release was observed following treatment of C. albicans mitochondria with Hst 5. Superoxide dismutase enzymes of C. albicans and Saccharomyces cerevisiae provide essential protection against oxidative stress; therefore, we tested whether SOD mutants have increased susceptibility to Hst 5, as expected if ROS mediate fungicidal effects. Cell survival of S. cerevisiae SOD1/SOD2 mutants and C. albicans SOD1 mutants following Hst 5 treatment (31 micro M) was indistinguishable from the survival of wild-type cells treated with Hst 5. We conclude that ROS may not play a direct role in fungicidal activity and that Hst 5 does not initiate apoptosis or programmed cell death pathways. PMID:14693527

  1. Measuring and reporting attrition from obesity treatment programs: A call to action!

    PubMed

    Miller, Beth M L; Brennan, Leah

    2015-01-01

    The high attrition rates in obesity interventions are associated with poorer weight loss and maintenance for the individual and poorer overall treatment effectiveness and cost-effectiveness for the treatment provider. Increased knowledge about factors associated with attrition can facilitate the identification of individuals at risk of drop-out and inform treatment program improvements with the aim of maximising treatment retention. To date, a relatively small body of literature has explored attrition from weight-loss interventions using two methods of attrition assessment: identification of pre-treatment predictors of attrition and eliciting post-treatment reasons for attrition. A range of attrition rates have been reported and no reliable or consistent predictors of attrition have been found. It is unknown whether the lack of consistent findings reflects population or treatment differences, or if the discrepant findings simply reflect differences in definition and measurement of attrition. Further research is required to address these limitations. There is a need for a recognised definition of obesity treatment attrition, the consideration of predictors that are theoretically and empirically associated with attrition, the development of a well-validated and standardised measure of barriers to attendance, and assessment of both treatment completers and drop-outs. Understanding the factors that influence attrition can be used to inform the modification of treatment programs and to target those most at risk of drop-out so as to maximise the success of obesity interventions.

  2. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project - status to date January 1998

    SciTech Connect

    1998-04-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments.

  3. Differences between African Americans and Whites in reactions to affirmative action programs in hiring, promotion, training, and layoffs.

    PubMed

    Levi, Ariel S; Fried, Yitzhak

    2008-09-01

    This study examines the reactions of African Americans and Whites to affirmative action programs (AAPs) applied to 4 human resource activities: hiring, promotion, training, and layoffs. The results of a scenario-based experimental study conducted on a large sample (N > 800) of advanced undergraduate and MBA business school participants generally supported the hypothesis that human resource activity elicited systematic differences in reaction to AAPs between African Americans and Whites. The authors also replicated previous research on the effect of AAP strength and prior discrimination by the organization on reactions to AAPs. Results indicated that AAP strength levels moderated racial differences in reaction to AAPs, while the moderating role of prior discrimination by the organization was not supported. Implications for future research are discussed.

  4. Differences between African Americans and Whites in reactions to affirmative action programs in hiring, promotion, training, and layoffs.

    PubMed

    Levi, Ariel S; Fried, Yitzhak

    2008-09-01

    This study examines the reactions of African Americans and Whites to affirmative action programs (AAPs) applied to 4 human resource activities: hiring, promotion, training, and layoffs. The results of a scenario-based experimental study conducted on a large sample (N > 800) of advanced undergraduate and MBA business school participants generally supported the hypothesis that human resource activity elicited systematic differences in reaction to AAPs between African Americans and Whites. The authors also replicated previous research on the effect of AAP strength and prior discrimination by the organization on reactions to AAPs. Results indicated that AAP strength levels moderated racial differences in reaction to AAPs, while the moderating role of prior discrimination by the organization was not supported. Implications for future research are discussed. PMID:18808229

  5. Physicians Taking Action Against Smoking: an intervention program to optimize smoking cessation counselling by Montreal general practitioners.

    PubMed

    Tremblay, M; Gervais, A; Lacroix, C; O'Loughlin, J; Makni, H; Paradis, G

    2001-09-01

    In 1997 the Direction de la santé publique de Montréal-Centre initiated "Physicians Taking Action Against Smoking," a 5-year intervention program to improve the smoking cessation counselling practices of general practitioners (GPs) in Montreal. Program development was guided by the precede-proceed model. This model advocates identifying factors influencing the outcome, in this case counselling practices. These factors are then used to determine the program objectives, to develop and tailor program activities and to design the evaluation. Program activities during the first 3 years included cessation counselling workshops and conferences for GPs, publication of articles in professional interest journals, publication of clinical guidelines for smoking cessation counselling and dissemination of educational material for both GPs and smokers. The program also supported activities encouraging smokers to ask their GPs to help them stop smoking. Results from 2 cross-sectional surveys, conducted in 1998 and 2000, of random samples of approximately 300 GPs suggest some improvements over time in several counselling practices, including offering counselling to more patients and discussing setting a quit date. More improvements were observed among female than male GPs in both psychosocial factors related to counselling and specific counselling practices. For example, improvements were noted among female GPs in self-perceived ability to provide effective counselling and in the belief that it is important to schedule specific appointments to help patients quit; in addition, the perceived importance of several barriers to counselling decreased among female GPs. A greater proportion of the female respondents to the 2000 survey offered written educational material than was the case in 1998, and a greater proportion of the male GPs devoted more time to counselling in 2000 than in 1998; however, among male GPs the proportion who discussed the pros and cons of smoking with patients

  6. Senescence and programmed cell death in plants: polyamine action mediated by transglutaminase

    PubMed Central

    Del Duca, Stefano; Serafini-Fracassini, Donatella; Cai, Giampiero

    2014-01-01

    Research on polyamines (PAs) in plants laps a long way of about 50 years and many roles have been discovered for these aliphatic cations. PAs regulate cell division, differentiation, organogenesis, reproduction, dormancy-break and senescence, homeostatic adjustments in response to external stimuli and stresses. Nevertheless, the molecular mechanisms of their multiple activities are still matter of research. PAs are present in free and bound forms and interact with several important cell molecules; some of these interactions may occur by covalent linkages catalyzed by transglutaminase (TGase), giving rise to “cationization” or cross-links among specific proteins. Senescence and programmed cell death (PCD) can be delayed by PAs; in order to re-interpret some of these effects and to obtain new insights into their molecular mechanisms, their conjugation has been revised here. The TGase-mediated interactions between proteins and PAs are the main target of this review. After an introduction on the characteristics of this enzyme, on its catalysis and role in PCD in animals, the plant senescence and PCD models in which TGase has been studied, are presented: the corolla of naturally senescing or excised flowers, the leaves senescing, either excised or not, the pollen during self-incompatible pollination, the hypersensitive response and the tuber storage parenchyma during dormancy release. In all the models examined, TGase appears to be involved by a similar molecular mechanism as described during apoptosis in animal cells, even though several substrates are different. Its effect is probably related to the type of PCD, but mostly to the substrate to be modified in order to achieve the specific PCD program. As a cross-linker of PAs and proteins, TGase is an important factor involved in multiple, sometimes controversial, roles of PAs during senescence and PCD. PMID:24778637

  7. Conclusions drawn from actions implemented within the first stage of the Cracow program of energy conservation and clean fossil fuels

    SciTech Connect

    Bieda, J.; Bardel, J.; Pierce, B.

    1995-12-31

    Since 1992 Brookhaven National Laboratory (BNL) and Pacific Northwest Laboratory (PNL), acting on behalf of the U.S. Department of Energy, executed the first stage of the Cracow Program of Energy Conservation and Clean Fossil Fuels, called also American-Polish Program of Actions for Elimination of Low Emission Sources in Cracow. The main contractor for BNL and PNL was the Cracow Development Office (BRK). The interest in improving the condition of Cracow air results from the fact that the standard for permissible air pollution was exceeded several times in Cracow and especially within the central part of the town. Therefore, air pollution appeared one of the most important problems that faced the municipal authorities. It followed from monitoring investigations that the high level of air pollutant concentration is caused by in-home coal-fired tile stoves operated in winter seasons and by coal- and coke-fired boiler houses simulated mainly in the central part of the town. The results obtained in first stage are presented. This paper is an attempt to formulate conclusions drawn from these works and recommendations with regard to the future policy of the town authorities; selected results are presented to clarify or illustrate the conclusions.

  8. Engineering feasibility analysis for in-situ stabilization of Canonsburg residues. [UMTRA project

    SciTech Connect

    Not Available

    1982-01-01

    The US Department of Energy is considering several methods for carrying out remedial actions in Canonsburg, Pennsylvania, at the site of an inactive uranium-processing mill. The main objective of this study is to determine the feasibility of in-situ stabilization as the remedial action. In-situ stabilization is an alternative to site decontamination and offsite disposal. The problems associated with offsite hauling of large quantities of contaminated material and with the location and development of a new disposal site could be avoided by the implementation of an in-situ stabilization concept. In addition, the in-situ approach would be more cost-effective than offsite disposal. This study will establish that a technically feasible and implementable in-situ stabilization concept can be developed that meets regulatory requirements and is cost effective. This study in no way commits the DOE to implement any specific actions described herein. 11 refs., 30 figs., 24 tabs.

  9. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  10. Evaluating dosage effects for the positive action program: How implementation impacts internalizing symptoms, aggression, school hassles, and self-esteem.

    PubMed

    Smokowski, Paul R; Guo, Shenyang; Wu, Qi; Evans, Caroline B R; Cotter, Katie L; Bacallao, Martica

    2016-01-01

    Positive Action (PA) is a school-based intervention for elementary-, middle-, and high-school students that aims to decrease problem behaviors (e.g., violence, substance use) and increase positive behaviors (e.g., academic achievement, school engagement). PA has a long history of documented success achieving these aims, making it an Evidence Based Practice (EBP). Intervention research on EBP's has established the importance of implementation fidelity, especially with regard to program dosage; failure to properly implement an EBP can have negative consequences on targeted outcomes, especially if participants are exposed to a low dosage of the program (e.g., fewer lessons than specified). Much of the current research on PA has neglected to examine how program dosage impacts PA's effect on targeted outcomes. Using propensity score models, multiple imputation, and a 2-level hierarchical linear model, the current study fills this gap and examines how different dosages of PA as measured by years participating in PA and number of PA lessons, impacts adolescent internalizing symptoms, aggression, perceptions of school hassles, and self-esteem over a 3-year period. The current sample included middle school students in grades 6, 7, and 8 (N = 5,894). The findings indicate that students who received 3 years of the PA intervention and a high number of PA lessons had a significantly higher self-esteem score than those who received 0 years of PA or zero lessons. Participants who received 1 year of PA also reported significantly lower school hassle scores than those who received 0 years. Dosage had no statistically significant effects on aggression or internalizing score. Implications are discussed. (PsycINFO Database Record

  11. Evaluating dosage effects for the positive action program: How implementation impacts internalizing symptoms, aggression, school hassles, and self-esteem.

    PubMed

    Smokowski, Paul R; Guo, Shenyang; Wu, Qi; Evans, Caroline B R; Cotter, Katie L; Bacallao, Martica

    2016-01-01

    Positive Action (PA) is a school-based intervention for elementary-, middle-, and high-school students that aims to decrease problem behaviors (e.g., violence, substance use) and increase positive behaviors (e.g., academic achievement, school engagement). PA has a long history of documented success achieving these aims, making it an Evidence Based Practice (EBP). Intervention research on EBP's has established the importance of implementation fidelity, especially with regard to program dosage; failure to properly implement an EBP can have negative consequences on targeted outcomes, especially if participants are exposed to a low dosage of the program (e.g., fewer lessons than specified). Much of the current research on PA has neglected to examine how program dosage impacts PA's effect on targeted outcomes. Using propensity score models, multiple imputation, and a 2-level hierarchical linear model, the current study fills this gap and examines how different dosages of PA as measured by years participating in PA and number of PA lessons, impacts adolescent internalizing symptoms, aggression, perceptions of school hassles, and self-esteem over a 3-year period. The current sample included middle school students in grades 6, 7, and 8 (N = 5,894). The findings indicate that students who received 3 years of the PA intervention and a high number of PA lessons had a significantly higher self-esteem score than those who received 0 years of PA or zero lessons. Participants who received 1 year of PA also reported significantly lower school hassle scores than those who received 0 years. Dosage had no statistically significant effects on aggression or internalizing score. Implications are discussed. (PsycINFO Database Record PMID:26950079

  12. Completion report for the UMTRA project Vitro processing site, Salt Lake City, Utah

    SciTech Connect

    1996-08-01

    This completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approval design and that all U.S. Environmental Protection Agency (EPA) standards have been satisfied. Included as appendixes to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawing and the EPA standards; the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objectives of remedial action at Salt Lake City were to remove the tailings from the former processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. The final remedial action plan, which is approved by the U.S. Department of Energy and concurred upon by the U.S. Nuclear Regulator Commission and the state of Utah, contains the conceptual design used to develop the final approved design. During remedial action construction operations, conditions were encountered that required design features that differed form the conceptual design. These conditions and the associated design changes are noted in the record drawings. All remedial action activities were completed in conformance with the specifications and drawings. In the opinion of the state of Utah, the record drawings accurately reflect existing property conditions at the processing site.

  13. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    SciTech Connect

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site.

  14. ACTION. Annual Report 1974.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1974. After an introduction that notes accomplishments of the past year, a review of domestic operations discusses such programs as VISTA, University Year for ACTION, National Student Volunteer Program, Foster Grandparent Program, and others according…

  15. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites.

    PubMed

    Gonzales, D E; Millard, J B; Miller, M L; Metzler, D

    1994-01-01

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequately attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a #4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.

  16. UMTRA Project water sampling and analysis plan, Gunnison, Colorado. Revision 2

    SciTech Connect

    1995-09-01

    Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually at the Gunnison processing site (GUN-01) and disposal site (GUN-08). Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer (Tertiary gravels) at the Gunnison disposal site. Semiannual water sampling is scheduled for the spring and fall. Water quality sampling is conducted at the processing site (1) to ensure protection of human health and the environment, (2) for ground water compliance monitoring during remedial action construction, and (3) to define the extent of contamination. At the processing site, the frequency and duration of sampling will be dependent upon the nature and extent of residual contamination and the compliance strategy chosen. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation.

  17. Chart Your Own Future: How Your Individualized Education Program (IEP) Can Help. PACER Center ACTion Information Sheets. PHP-c113

    ERIC Educational Resources Information Center

    PACER Center, 2006

    2006-01-01

    Although high school students cannot control every aspect of their school education, they do have the power to make changes in their education program. As they influence major parts of their IEP, they gain more freedom and more control over what happens to them. This action sheet describes three steps for high school students to consider in taking…

  18. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    ERIC Educational Resources Information Center

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  19. [An Affirmative Action Program to Redress Past Inequities and to Establish a Policy of Equal Treatment and Equal Opportunity at the University of Wisconsin for All Women.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison.

    The Association of Faculty Women's proposals for an affirmative action program were developed by women who have expertise in the areas that are discussed. These areas include: establishment of an office for women; hiring and promotion goals; employment; professional, scientific and specialist academic staff; fringe benefits; university governance;…

  20. Developing a strategy and closure criteria for radioactive and mixed waste sites in the ORNL remedial action program: Regulatory interface

    SciTech Connect

    Trabalka, J.R.

    1987-09-01

    Some options for stabilization and treatment of contaminated sites can theoretically provide a once-and-for-all solution (e.g., removal or destruction of contaminants). Most realizable options, however, leave contaminants in place (in situ), potentially isolated by physical or chemical, but more typically, by hydrologic measures. As a result of the dynamic nature of the interactions between contaminants, remedial measures, and the environment, in situ stablization measures are likely to have limited life spans, and maintenance and monitoring of performance become an essential part of the scheme. The length of formal institutional control over the site and related questions about future uses of the land and waters are of paramount importance. Unique features of the ORNL site and environs appear to be key ingredients in achieving the very long term institutional control necessary for successful financing and implementation of in situ stabilization. Some formal regulatory interface is necessary to ensure that regulatory limitations and new guidance which can affect planning and implementation of the ORNL Remedial Action Program are communicated to ORNL staff and potential technical and financial limitations which can affect schedules or alternatives for achievement of long-term site stabilization and the capability to meet environmental regulations are provided to regulatory bodies as early as possible. Such an interface should allow decisions on closure criteria to be based primarily on technical merit and protection of human health and the environment. A plan for interfacing with federal and state regulatory authorities is described. 93 refs., 1 fig., 4 tabs.

  1. Patient engagement and patient support programs in allergy immunotherapy: a call to action for improving long-term adherence.

    PubMed

    Demoly, Pascal; Passalacqua, Giovanni; Pfaar, Oliver; Sastre, Joaquin; Wahn, Ulrich

    2016-01-01

    Allergy immunotherapy (AIT) is acknowledged to produce beneficial mid- and long-term clinical and immunologic effects and increased quality of life in patients with allergic respiratory diseases (such as allergic rhinoconjunctivitis and allergic asthma). However, poor adherence to AIT (due to intentional and/or non-intentional factors) is still a barrier to achieving these benefits. There is an urgent need for patient support programs (PSPs) that encompass communication, educational and motivational components. In the field of AIT, a PSP should be capable of (1) improving adherence, (2) boosting patient engagement, (3) explaining how AIT differs from pharmacological allergy treatments; (4) increasing health literacy about chronic, progressive, immunoglobulin-E-mediated immune diseases, (5) helping the patient to understand and manage local or systemic adverse events, and (6) providing and/or predicting local data on aeroallergen levels. We reviewed the literature in this field and have identified a number of practical issues to be addressed when implementing a PSP for AIT: the measurement of adherence, the choice of technologies, reminders, communication channels and content, the use of "push" messaging and social networks, interactivity, and the involvement of caregivers and patient leaders. A key issue is "hi-tech" (i.e. approaches based mainly on information technology) vs. "hi-touch" (based mainly on interaction with humans, i.e. family members, patient mentors and healthcare professionals). We conclude that multistakeholder PSPs (combining patient-, provider and society-based actions) must now be developed and tested with a view to increasing adherence, efficacy and safety in the field of AIT. PMID:27478445

  2. A Longitudinal Evaluation of the Positive Action Program in a Low-Income, Racially Diverse, Rural County: Effects on Self-Esteem, School Hassles, Aggression, and Internalizing Symptoms.

    PubMed

    Guo, Shenyang; Wu, Qi; Smokowski, Paul R; Bacallao, Martica; Evans, Caroline B R; Cotter, Katie L

    2015-12-01

    Positive Action is a school-based program that aims to decrease problem behaviors (e.g., violence, substance use) and increase positive behaviors (e.g., school engagement, academic achievement). Although a number of studies have shown that Positive Action successfully achieves these goals, few studies have evaluated the program's effectiveness in rural schools. Given that rural youth are at an increased risk for risky behaviors (e.g., violence, substance use), this is a critical gap in the existing Positive Action research base. The current study assesses the impact of Positive Action on change rates of self-esteem, school hassles, aggression, and internalizing symptoms in a group (N = 1246, 52% female) of ethnically/racially diverse (27% White, 23% African American, 12% mixed race/other, 8% Latino, 30% as American Indian) middle school youth (age range 9-20) located in two violent, low-income rural counties in North Carolina. One county engaged in Positive Action over the 3-year study window while the other county did not. Following multiple imputation and propensity score analysis, 4 two-level hierarchical linear models were run using each of the outcome measures as dependent variables. The results indicate that the program generates statistically significant beneficial effects for youth from the intervention county on self-esteem scores and school hassles scores. Although the program generates beneficial effects for intervention youth on the change in aggression scores, the finding is not statistically significant. The finding on the change in internalizing scores shows a non-significant detrimental effect: the youth from the comparison county have lower internalizing scores than those from the intervention county. Implications are discussed.

  3. A Longitudinal Evaluation of the Positive Action Program in a Low-Income, Racially Diverse, Rural County: Effects on Self-Esteem, School Hassles, Aggression, and Internalizing Symptoms.

    PubMed

    Guo, Shenyang; Wu, Qi; Smokowski, Paul R; Bacallao, Martica; Evans, Caroline B R; Cotter, Katie L

    2015-12-01

    Positive Action is a school-based program that aims to decrease problem behaviors (e.g., violence, substance use) and increase positive behaviors (e.g., school engagement, academic achievement). Although a number of studies have shown that Positive Action successfully achieves these goals, few studies have evaluated the program's effectiveness in rural schools. Given that rural youth are at an increased risk for risky behaviors (e.g., violence, substance use), this is a critical gap in the existing Positive Action research base. The current study assesses the impact of Positive Action on change rates of self-esteem, school hassles, aggression, and internalizing symptoms in a group (N = 1246, 52% female) of ethnically/racially diverse (27% White, 23% African American, 12% mixed race/other, 8% Latino, 30% as American Indian) middle school youth (age range 9-20) located in two violent, low-income rural counties in North Carolina. One county engaged in Positive Action over the 3-year study window while the other county did not. Following multiple imputation and propensity score analysis, 4 two-level hierarchical linear models were run using each of the outcome measures as dependent variables. The results indicate that the program generates statistically significant beneficial effects for youth from the intervention county on self-esteem scores and school hassles scores. Although the program generates beneficial effects for intervention youth on the change in aggression scores, the finding is not statistically significant. The finding on the change in internalizing scores shows a non-significant detrimental effect: the youth from the comparison county have lower internalizing scores than those from the intervention county. Implications are discussed. PMID:26411991

  4. Annual Report on Wildlife Activities, September 1985 - April 1986, Action item 40.1, Columbia River Basin Fish and Wildlife Program.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-04-01

    This annual report addresses the status of wildlife projects Bonneville Power Administration (BPA) has implemented from September 1985 to April 1986 under the Columbia River Basin Fish and Wildlife Program (Program) established pursuant to the Northwest Power Act (P.L. 96-501). Wildlife projects implemented prior to September 1985 are discussed in BPA's September 1985 Annual Report on Wildlife Activities. This report provides a brief synopsis, review, and discussion of wildlife activities BPA has undertaken. When available, annual and final reports are listed for each project. The wildlife section of the Program establishes a process intended to achieve two objectives: wildlife protection, mitigation, and enhancement planning; and implementation of actions to protect, mitigate, and enhance wildlife affected by development and operation of hydroelectric facilities in the Columbia River Basin. The wildlife mitigation planning process developed by the Northwest Power Planning Council (Council) is a stepwise process that proceeds through the review of the status of wildlife mitigation at Columbia River Basin hydroelectric facilities [Measure 1004 (b)(l)]; estimates wildlife losses from hydroelectric development and operation [Measure 1004 (b)(2)]; and recommends actions for the protection, mitigation, or enhancement of wildlife [Measure 1004 (b)(3), Mitigation Plans]. Implementation of wildlife protection, mitigation, and enhancement will occur upon amendment of wildlife actions into the Program by the Council. The majority of BPA's effort to date has gone towards coordinating and implementing wildlife protection, mitigation, and enhancement planning projects.

  5. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    SciTech Connect

    Not Available

    1994-09-01

    Ground water in the uppermost aquifer beneath and downgradient from the Spook site was contaminated by uranium-processing activities that occurred from 1962 until 1966. Contamination from the tailings pile and the acid pond (including uranium, selenium, nitrate, and radium-226 and -228) leached into the subsurface by infiltration and migrated into ground water, forming a plume extending approximately 2,500 feet (ft) (760 meters [m]) downgradient from the site. The surface remedial action at the Spook site under Subpart A of 40 CFR Part 192 consisted of stabilizing the uranium mill tailings and other residual radioactive materials in a disposal cell in the bottom of the Spook open-pit mine and covering the cell with overburden material. The ground water protection strategy was supplemental standards based on Class 3 ground water in the uppermost aquifer because of widespread ambient contamination. The proposed ground water protection strategy to comply with Subpart B of 40 CFR Part 192 at the Spook site is to perform no remediation. This strategy is based on ground water in the uppermost aquifer (also the zone of contamination) being classified as Class 3, which allows the application of supplemental standards. Class 3 ground water beneath the Spook site is neither a current nor a potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed in public water supply systems.

  6. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120... satisfactorily provide in-house technical assistance to Microloan clients and prospective Microloan clients;...

  7. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120... satisfactorily provide in-house technical assistance to Microloan clients and prospective Microloan clients;...

  8. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120... satisfactorily provide in-house technical assistance to Microloan clients and prospective Microloan clients;...

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    SciTech Connect

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  10. The Case for Action Now. Strategic Planning to Offset the Anticipated Program Cuts of the Reagan Administration.

    ERIC Educational Resources Information Center

    Community Service Society of New York, NY.

    This paper discusses the effects of President Reagan's budget cuts on federally supported human service programs in New York. Various programs are analyzed to determine their vulnerability to budget reductions. It is suggested that employment, nutrition and health programs are most likely to be cut while education, adoption assistance, senior…

  11. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  12. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  13. New Brunswick Site annual environmental report for calendar year 1991, New Brunswick, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    SciTech Connect

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the New Brunswick Site (NBS) and surrounding area, implementation of the program, and monitoring results for 1991. The site, near New Brunswick,, New Jersey, is a 5.6-acre vacant, fenced, and grass-covered area. Environmental monitoring of NBS began in 1981 when the site was part of the US Department of Energy`s (DOE) Surplus Facilities Management Program. In 1990 responsibility for NBS was transferred to the Formerly Utilized Sites Remedial Action Program (FUSP.4P). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the,early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at NBS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-228, thorium-230, thorium-232, americium-241, cesium-137, plutonium-239, and total uranium in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater, surface water, and sediments. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  14. Environmental education with a local focus: The development of action competency in community leaders through participation in an environmental leadership program

    NASA Astrophysics Data System (ADS)

    Cairns, Karen Jean

    2001-07-01

    This dissertation is a historical and theoretical examination of environmental education to promote community leadership in local environmental issues. It begins with an overview of the history of environmental education, historical perspectives of the beginning of the field, ongoing differences in perspectives of practitioners, and its relationship to the larger field of education. Using a prevalent definition of environmental education as education with an aim of promoting actions, which are environmentally responsible and careful, I examine a variety of educational approaches and their results in achieving this objective. Reasons for using a local focus in terms of promotion of community sustainability are explored, and the literature review ends with a discussion of the value of community action through participatory democratic processes. The dissertation is divided into five chapters, covering an introduction to the purpose and significance of the study, literature review, methodology, results and analysis, and conclusion and implications of the research. Two programs, one at a city or urban level and one at a state level, and outcomes for their participants are explored and compared through data collected from interviews, field observation, and program documents. Findings demonstrated the value of a local focus for environmental education programs, plus the importance of experiential learning, or learning through some sort of personal connection and involvement. Examples of the types of experiential learning involved are tours or field trips, role-playing, and games illustrating concepts. Results emphasized the importance of educational process over content, information, or factual knowledge. The urban leadership program demonstrated the value of a local focus and experiential process in increasing motivation for action. The state program demonstrated the value of education of environmental leaders in democratic processes, especially collaboration, inclusion

  15. Handbook for Ecology Action.

    ERIC Educational Resources Information Center

    Eber, Ronald

    This handbook has been compiled to aid concerned individuals and ecology groups more adequately define their goals, initiate good programs, and take effective action. It examines the ways a group of working individuals can become involved in action programs for ecological change. Part 1 deals with organization, preliminary organizing, structuring,…

  16. Partnering for Environmental Sustainability: A Case Study of a University's Participation in the Community Action for a Renewed Environment Program

    ERIC Educational Resources Information Center

    Szarleta, Ellen

    2010-01-01

    This article examines an important policy initiative that creates self-sustaining partnerships among community stakeholders, including academic institutions. The Community Action for a Renewed Environment (CARE) model of collaborative problem-solving (CPS) builds community capacity and knowledge while addressing the challenges of toxic pollution…

  17. Beyond the Catch-22 of School-Based Social Action Programs: Toward a More Pragmatic Approach for Dealing with Power

    ERIC Educational Resources Information Center

    Fehrman, Darwyn; Schutz, Aaron

    2011-01-01

    This study examines a two-year effort to engage groups of inner-city students in community engagement projects at Social Action Charter High School, SACHS, in Milwaukee, Wisconsin. In this project, graduate student volunteers coached small groups of students working on community change projects, collecting data on what happened over time. Kahne…

  18. The Assessment of a Tutoring Program to Meet CAS Standards Using a SWOT Analysis and Action Plan

    ERIC Educational Resources Information Center

    Fullmer, Patricia

    2009-01-01

    This article summarizes the use of SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis and subsequent action planning as a tool of self-assessment to meet CAS (Council for the Advancement of Standards in Higher Education) requirements for systematic assessment. The use of the evaluation results to devise improvements to increase the…

  19. 77 FR 50504 - Clean Air Act Operating Permit Program; Action on Petition for Objection to State Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... for Georgia-Pacific Consumer Products AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of... permit issued by the Wisconsin Department of Natural Resources (WDNR) to Georgia-Pacific Consumer Products (Georgia- Pacific). Sections 307(b) and 505(b)(2) of the Act provide that a petitioner may ask...

  20. "I've Lost My Husband, My House and I Need a New Knee...Why Should I Smile?": Action Research Evaluation of a Group Cognitive Behavioural Therapy Program for Older Adults with Depression

    ERIC Educational Resources Information Center

    Richardson, Lisa; Reid, Corinne

    2006-01-01

    The current paper details an action research approach to developing and evaluating a group cognitive-behavioural therapy (CBT) program for older adults (65+ years) experiencing depression. This approach allowed the development of a novel program and for each component of the program to be evaluated and modified in an iterative, developmental…