Sample records for active site closure

  1. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was

  2. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less

  3. Humid site stabilization and closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cutshall, N.H.

    1981-01-01

    The purpose of the work described here is to identify and evaluate the importance of factors that are expected to dictate the nature of site stabilization and closure requirements. Subsequent efforts will plan for implementation of such requirements. Two principal areas of site stabilization and closure effort will be pursued initially - geological management and vegetation management. The geological effort will focus on chemical weathering and surficial erosion. Such catastrophic geologic events as landslides, flooding, earthquakes, volcanos, etc. are already considered in site selection and operation and these factors will not be emphasized initially. Vegetation management will be designed tomore » control erosion, to minimize nuclide mobilization by roots and to be compatible with natural successional pressures. It is anticipated that the results of this work will be important both to site selection and operation as well as the actual stabilization and closure procedure.« less

  4. Single-site neural tube closure in human embryos revisited.

    PubMed

    de Bakker, Bernadette S; Driessen, Stan; Boukens, Bastiaan J D; van den Hoff, Maurice J B; Oostra, Roelof-Jan

    2017-10-01

    Since the multi-site closure theory was first proposed in 1991 as explanation for the preferential localizations of neural tube defects, the closure of the neural tube has been debated. Although the multi-site closure theory is much cited in clinical literature, single-site closure is most apparent in literature concerning embryology. Inspired by Victor Hamburgers (1900-2001) statement that "our real teacher has been and still is the embryo, who is, incidentally, the only teacher who is always right", we decided to critically review both theories of neural tube closure. To verify the theories of closure, we studied serial histological sections of 10 mouse embryos between 8.5 and 9.5 days of gestation and 18 human embryos of the Carnegie collection between Carnegie stage 9 (19-21 days) and 13 (28-32 days). Neural tube closure was histologically defined by the neuroepithelial remodeling of the two adjoining neural fold tips in the midline. We did not observe multiple fusion sites in neither mouse nor human embryos. A meta-analysis of case reports on neural tube defects showed that defects can occur at any level of the neural axis. Our data indicate that the human neural tube fuses at a single site and, therefore, we propose to reinstate the single-site closure theory for neural tube closure. We showed that neural tube defects are not restricted to a specific location, thereby refuting the reasoning underlying the multi-site closure theory. Clin. Anat. 30:988-999, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  5. Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-06-27

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field

  6. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  7. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  8. Suitability of Exoseal Vascular Closure Device for Antegrade Femoral Artery Puncture Site Closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmelter, Christopher, E-mail: christopher.schmelter@klinikum-ingolstadt.de; Liebl, Andrea; Poullos, Nektarios

    Purpose. To assess the efficacy and safety of the Exoseal vascular closure device for antegrade puncture of the femoral artery. Methods. In a prospective study from February 2011 to January 2012, a total of 93 consecutive patients received a total of 100 interventional procedures via an antegrade puncture of the femoral artery. An Exoseal vascular closure device (6F) was used for closure in all cases. Puncture technique, duration of manual compression, and use of compression bandages were documented. All patients were monitored by vascular ultrasound and color-coded duplex sonography of their respective femoral artery puncture site within 12 to 36more » h after angiography to check for vascular complications. Results. In 100 antegrade interventional procedures, the Exoseal vascular closure device was applied successfully for closure of the femoral artery puncture site in 96 cases (96 of 100, 96.0 %). The vascular closure device could not be deployed in one case as a result of kinking of the vascular sheath introducer and in three cases because the bioabsorbable plug was not properly delivered to the extravascular space adjacent to the arterial puncture site, but instead fully removed with the delivery system (4.0 %). Twelve to 36 h after the procedure, vascular ultrasound revealed no complications at the femoral artery puncture site in 93 cases (93.0 %). Minor vascular complications were found in seven cases (7.0 %), with four cases (4.0 %) of pseudoaneurysm and three cases (3.0 %) of significant late bleeding, none of which required surgery. Conclusion. The Exoseal vascular closure device was safely used for antegrade puncture of the femoral artery, with a high rate of procedural success (96.0 %), a low rate of minor vascular complications (7.0 %), and no major adverse events.« less

  9. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  10. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the

  11. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...

  12. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less

  13. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  14. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  15. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  16. Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-08-15

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  17. Closure report for Corrective Action Unit 211, Area 15 EPA Farm waste sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

  18. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  19. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  20. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  1. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  2. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  3. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  4. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not

  5. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  6. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  7. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  8. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor

  9. Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister and Patrick Matthews

    2012-11-01

    The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less

  10. Closure Report for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.

  11. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less

  12. Safety Oversight of Decommissioning Activities at DOE Nuclear Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zull, Lawrence M.; Yeniscavich, William

    2008-01-15

    The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive materialmore » contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.« less

  13. Divided and Sliding Superficial Temporal Artery Flap for Primary Donor-site Closure

    PubMed Central

    Sugio, Yuta; Seike, Shien; Hosokawa, Ko

    2016-01-01

    Summary: Superficial temporal artery (STA) flaps are often used for reconstruction of hair-bearing areas. However, primary closure of the donor site is not easy when the size of the necessary skin island is relatively large. In such cases, skin grafts are needed at the donor site, resulting in baldness. We have solved this issue by applying the divided and sliding flap technique, which was first reported for primary donor-site closure of a latissimus dorsi musculocutaneous flap. We applied this technique to the hair-bearing STA flap, where primary donor-site closure is extremely beneficial for preventing baldness consequent to skin grafting. The STA flap was divided into 3, and creation of large flap was possible. Therefore, we concluded that the divided and sliding STA flap could at least partially solve the donor-site problem. Although further investigation is necessary to validate the maximum possible flap size, this technique may be applicable to at least small defects that are common after skin cancer ablation or trauma. PMID:27975020

  14. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal

  15. [Clinical epidemiological study of neural tube defects classified according to the five sites of closure].

    PubMed

    Sanchis Calvo, A; Martínez- Frías, M

    2001-02-01

    To identify the frequency at birth of neural tube defects (NTD) in the Spanish population. NTDs were considered as a whole as well as according to the different sites of closure failure, following the theory of multisite closure of the neural tube. To analyze the epidemiological characteristics of the different sites. Data derived from the Spanish Collaborative Study of Congenital Malformations (ECEMC), from April 1976 to March 1995. Among the 1,222,698 live births during this period, 784 infants had NTD were controlled. Among these, 784 infants had NTD. The prevalence of NTD in our population was 1.01 per 1,000 births, a frequency which is considered medium-to low. Only 5.74% of the NTD were of known etiology: 2.17% were genic, 1.27% were chromosomic and 2.29% were environmental. Excluding NTD of genetic etiology, whether genic or chromosomic, most of the remaining were isolated defects (multifactorial) and 16.78% multiple malformations. Site 1, where the closure of the neural tube starts, represented 24% of all the affected sites. However, more than 50% of the NTDs corresponded to closure failure at the junction of two sites. As in other populations with a low prevalence of NTD at birth, the prevalence of these defects in our population showed a trend to decrease with time, due to the possibility of interrupting gestation after prenatal diagnosis. All the NTD could be classified according to the theory of multisite closure of the neural tube, including 13 cases with several noncontiguous affected sites. Two types of NTD were observed: in the first, closure failed to occur and in the second, two closures failed to meet.

  16. CO2CARE - Site Closure Assessment Research - Recent Results

    NASA Astrophysics Data System (ADS)

    Wipki, Mario; Liebscher, Axel; Kühn, Michael; Lüth, Stefan; Durucan, Sevket; Deflandre, Jean-Pierre; Wollenweber, Jens; Chadwick, Andy; Böhm, Gualtiero

    2013-04-01

    The EU project CO2CARE, which started in January 2011, supports the large scale demonstration of CCS technology by addressing requirements of operators and regulators face in terms of CO2 storage site abandonment. The CO2CARE consortium, consisting of 24 project partners from universities, research institutes, and the industry, investigate technologies and procedures for abandonment and post-closure safety, satisfying the regulatory requirements for the transfer of responsibility. Nine key injections sites in Europe, USA, Japan, and Australia, each with a specific (hydro) geological and environmental character, were selected for investigations. These sites can be divided into the CO2 storage types on-shore, off-shore, natural CO2 reservoir, depleted gas reservoirs, and saline aquifers. The project mainly focuses on three key areas: - well abandonment and long-term integrity; - reservoir management and prediction from closure to the long-term; - risk management methodologies for long-term safety. These key areas are in turn closely linked to the three high-level requirements of the EU Directive 2009/31/EC, Article 18 for CO2 storage which are: (i) absence of any detectable leakage, (ii) conformity of actual behaviour of the injected CO2 with the modeled behaviour, and (iii) the storage site is evolving towards a situation of long-term stability. The identification of criteria and the development of site abandonment procedures and technologies, which guarantee the fulfillment of the high-level requirements, are the major objectives in CO2CARE. These criteria have to be fulfilled prior to subsequent transfer of responsibility to the competent authorities, typically 20 or 30 years after site closure. Finally, the essential results of the different working groups in CO2CARE will feed into overall guidelines for regulatory compliance and "Best Practice" for site abandonment. Dissemination of the results will show policy makers and the general public how site abandonment

  17. Is adhesive paper-tape closure of video assisted thoracoscopic port-sites safe?

    PubMed

    Luckraz, Heyman; Rammohan, Kandadai S; Phillips, Mabel; O'Keefe, Peter A

    2007-07-01

    Video assisted thoracoscopic surgery (VATS) is used in lung surgery for diagnostic, staging, curative and palliative purposes. The port-sites are usually sutured with dissolvable sutures. The use of adhesive paper-tape for port-site closure was assessed by a prospective randomised double-blind control trial comparing sutured to adhesive paper-tape closure. The following outcomes were assessed: incidence of clinically significant pneumothorax, wound healing using the ASEPSIS score, patient's comfort (pain score using a visual analog score), the time difference between the two techniques of wound closure and cost savings. Thirty patients were recruited in each group. No clinically significant pneumothoraces occurred in either group. There were no significant differences between the two groups in terms of immediate post-operative pain scores, wound cosmesis and wound complications. It was quicker to close the wound with adhesive paper-tape with a mean time of closure per unit length of wound of 9.3 and 2.2s/mm for the groups, respectively. The cost for wound closure (per patient) was $0.8 for the adhesive paper-tape group and $4.00 for the sutures.

  18. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less

  20. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and

  1. New suturing technique for robotic-assisted vaginal cuff closure during single-site hysterectomy.

    PubMed

    Shin, So-Jin; Chung, Hyewon; Kwon, Sang-Hoon; Cha, Soon-Do; Cho, Chi-Heum

    2017-06-01

    To describe a simple and efficient technique for suturing the vaginal cuff in robotic-assisted single-site hysterectomy using barbed suture and a straight needle. Consecutive patients undergoing robotic-assisted single-site hysterectomy from February 2014 to August 2015 at Dong San Hospital, Keimyung University were included. Surgeons used two barbed sutures in a running fashion to close the vaginal cuff. A barbed suture was exclusively used with a straightened needle in upward direction from posterior vaginal cuff to anterior vaginal cuff which played a pivotal role for closure. A total of 100 patients underwent robotic-assisted single-site hysterectomy. The total operation time was 132.5 min and vaginal cuff closure time was 12.0 min. There were no postoperative complications; vaginal cuff dehiscence, vaginal cuff infection, and vaginal bleeding that require surgical intervention or admission. The use of barbed suture with straightened needle to close the vaginal cuff in robotic-assisted single-site hysterectomy is easy to perform and demonstrates safety and efficacy. This technique offers secure, fast, and effective incision closure.

  2. Site closure management strategies and the responsiveness of conservation outcomes in recreational fishing.

    PubMed

    Gao, Lei; Hailu, Atakelty

    2018-02-01

    We develop and use an empirically based model, which integrates fishing behaviour and a coral reef system, to evaluate outcomes from site closure strategies to manage the effects of recreational fishing. The model is designed to estimate management effects in complex settings with two-way feedback effects (between fishing and ecosystem dynamics) as well as spillover effects where the closure of a site (or sites) leads to the redistribution of fishing effort. An iconic coral reef system is used as a case study. The results demonstrate that some site closure strategies provide little incremental benefits over less stringent approaches. They also show that some strategies targeting more sites are actually inferior to more limited strategies, demonstrating that, in the analysis of complex problems involving feedback effects and substitutions, there is little substitute for the use of empirically based and sound modelling as the basis for informed conservation decision making and stakeholder consultation. These findings have direct relevance not only for policies aimed at improving recreational fishing management but also for securing the supply of marine ecosystem services. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Pursestring closure of the stoma site leads to fewer wound infections: results from a multicenter randomized controlled trial.

    PubMed

    Lee, Janet T; Marquez, Thao T; Clerc, Daniel; Gie, Olivier; Demartines, Nicolas; Madoff, Robert D; Rothenberger, David A; Christoforidis, Dimitrios

    2014-11-01

    Surgical site infection after stoma reversal is common. The optimal skin closure technique after stoma reversal has been widely debated in the literature. We hypothesized that pursestring near-complete closure of the stoma site would lead to fewer surgical site infections compared with conventional primary closure. This study was a parallel prospective multicenter randomized controlled trial. This study was conducted at 2 university medical centers. Patients (N = 122) presenting for elective colostomy or ileostomy reversal were selected. Pursestring versus conventional primary closure of stoma sites were compared. Stoma site surgical site infection within 30 days of surgery, overall surgical site infection, delayed healing (open wound for >30 days), time to wound epithelialization, and patient satisfaction were the primary outcomes measured. The pursestring group had a significantly lower stoma site infection rate (2% vs 15%, p = 0.01). There was no difference in delayed healing or patient satisfaction between groups. Time to epithelialization was measured in only 51 patients but was significantly longer in the pursestring group (34.6 ± 20 days vs 24.1 ± 17 days, p = 0.02). This study was limited by the variability in procedures and surgeons, the limited follow-up after 30 days, and the inability to perform blinding. Pursestring closure after stoma reversal has a lower risk of stoma site surgical site infection than conventional primary closure, although wounds may take longer to heal with the use of this approach. NCT01713452 (www.clinicaltrials.gov).

  4. Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report, Amchitka Island, Alaska, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2006-09-01

    In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides themore » 2006 cap inspection results.« less

  5. Role of Groundwater Monitoring for Closure of Underground Nuclear Tests on the Nevada Test Site

    NASA Astrophysics Data System (ADS)

    Chapman, J. B.; Pohlmann, K.; Pohll, G.; Russell, C.

    2009-12-01

    Over 800 underground nuclear tests were conducted at the Nevada Test Site in a variety of hydrogeologic environments. As of the 1996 Environmental Impact Statement for the site, more than 100 million curies of radioactivity remained in the subsurface from these tests, much of it near or below the water table. The U.S. Department of Energy Environmental Management program is implementing a closure strategy for these sites that anticipates closure-in-place, natural attenuation, and institutional controls. Groundwater monitoring is a key component of this strategy, but its role is significantly evolved from that of a detection- or compliance-based monitoring concept. Indeed, monitoring is part of the integrated closure process itself, not an activity confined to a static post-closure period. The reasons for this evolution derive from the complex hydrogeologic conditions, the long time-frames of concern, and recognition that a significant degree of uncertainty is irreducible. The hundreds of test locations are grouped into Corrective Action Units that measure over 100 km2 in area and extend to depths in excess of 1000 m. Despite concerted data collection efforts, the technical basis for closure of these large regions relies heavily on complex numerical models of flow and transport. The inherent uncertainties in these models present challenges for reaching regulatory acceptance of closure, and challenges for confidently locating monitoring wells. The solution now being pursued for the NTS is to integrate model evaluation and monitoring. In addition to standard goals of contaminant detection and protection of human health, an explicit monitoring objective is to increase confidence in model results by assessing the reliability of model forecasts. The initial monitoring network is expected to eventually transition to a long-term closure design, with less emphasis on confidence-building as uncertainty in forecasts is reduced. The methodology for this iterative process of

  6. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Kauss

    2011-06-01

    November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low

  7. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less

  8. Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, David M.; Edge, Helen

    2013-07-01

    The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determinationmore » from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE

  9. 40 CFR 264.142 - Cost estimate for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the cost of final closure at the point in the facility's active life when the extent and manner of its... costs for on-site disposal if he can demonstrate that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure cost estimate may not incorporate any salvage value that...

  10. Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater

  11. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    2007-09-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less

  12. Role of organic aerosols in CCN activation and closure over a rural background site in Western Ghats, India

    NASA Astrophysics Data System (ADS)

    Singla, V.; Mukherjee, S.; Safai, P. D.; Meena, G. S.; Dani, K. K.; Pandithurai, G.

    2017-06-01

    The cloud condensation nuclei (CCN) closure study was performed to exemplify the effect of aerosol chemical composition on the CCN activity of aerosols at Mahabaleshwar, a high altitude background site in the Western Ghats, India. For this, collocated aerosol, CCN, Elemental Carbon (EC), Organic Carbon (OC), sub-micron aerosol chemical speciation for the period from 3rd June to 19th June 2015 was used. The chemical composition of non-refractory particulate matter (<1 μm) as measured by Time of Flight - Aerosol Chemical Speciation Monitor (ToF-ACSM) was dominated by organics with average concentration of 3.81 ± 1.6, 0.32 ± 0.06, 0.15 ± 0.02, 0.13 ± 0.03 and 0.95 ± 0.12 μg m-3 for organics, ammonium, chloride, nitrate and sulphate, respectively. The PM1 number concentration as obtained by Wide Range Aerosol Spectrometer (WRAS) varied from 750 to 6480 cm-3. The average mass concentration of elemental carbon (EC) as measured by OC-EC analyzer was 1.16 ± 0.4 μg m-3. The average CCN concentrations obtained from CCN counter (CCNC) at five super-saturations (SS's) was 118 ± 58 cm-3 (0.1% SS), 873 ± 448 cm-3 (0.31% SS), 1308 ± 603 cm-3 (0.52% SS), 1610 ± 838 cm-3 (0.73% SS) and 1826 ± 985 cm-3 (0.94% SS). The CCN concentrations were predicted using Köhler theory on the basis of measured aerosol particle number size distribution, size independent NR-PM1 chemical composition and calculated hygroscopicity. The CCN closure study was evaluated for 3 scenarios, B-I (all soluble inorganics), B-IO (all soluble organics and inorganics) and B-IOOA (all soluble inorganic and soluble oxygenated organic aerosol, OOA). OOA component was derived from the positive matrix factorization (PMF) analysis of organic aerosol mass spectra. Considering the bulk composition as internal mixture, CCN closure study was underestimated by 16-39% for B-I and overestimated by 47-62% for B-IO. The CCN closure result was appreciably improved for B-IOOA where the knowledge of OOA fraction was

  13. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  14. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  15. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  16. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  17. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  18. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impactedmore » groundwater« less

  19. 43 CFR 423.14 - How will Reclamation post and delineate closed areas at the site of the closure?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... closed areas at the site of the closure? 423.14 Section 423.14 Public Lands: Interior Regulations... RECLAMATION FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.14 How will Reclamation post and delineate closed areas at the site of the closure? Before or at the time of closing all...

  20. Columbus Closure Project Released without Radiological Restrictions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henderson, G.

    2007-07-01

    The Columbus Closure Project (CCP), a historic radiological research complex, was cleaned up for future use without radiological restriction in 2006. The CCP research and development site contributed to national defense, nuclear fuel fabrication, and the development of safe nuclear reactors in the United States until 1988 when research activities were concluded for site decommissioning. In November of 2003, the Ohio Field Office of the U.S. Department of Energy contracted ECC/E2 Closure Services, LLC (Closure Services) to complete the removal of radioactive contamination from of a 1955 era nuclear sciences area consisting of a large hot cell facility, research reactormore » building and underground piping. The project known as the Columbus Closure Project (CCP) was completed in 27 months and brought to a close 16 years of D and D in Columbus, Ohio. This paper examines the project innovations and challenges presented during the Columbus Closure Project. The examination of the CCP includes the project regulatory environment, the CS safety program, accelerated clean up innovation, project execution strategies and management of project waste issues and the regulatory approach to site release 'without radiological restrictions'. (authors)« less

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less

  2. Closure Report for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada, Revision 0 with Errata Sheet and ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The purpose of this CR is to document that the closure of CAU 5 complied with the NDEP-approved CAP closure requirements (NNSA/NSO, 2004). The closure activities specified in the CAP were based on the recommendations presented in the corrective action decision document (CADD) (NNSA/NSO, 2003). ROTC 1: The UR form was updated to the current format to include a. more detailed description of the UR and maintenance requirements. Information was edited due to the change of UR signs at the site to UR monuments/signs. The maintenance frequency was changed to annually because sign damage due to high winds was evidencedmore » during recent site inspections. The coordinates for the UR were originally based on NAD 27 and were modified to NAD 83 to comply with the most recent M&O database requirements. The modifications identified in this ROTC will supersede the existing posting requirements for the UR at CASs 06-1S-02 and 06-15-03 as identified in the CAU 5 CADD; CAU 5 CR; and the UR form associated with CASs 06-15-02 and 06-15-03.« less

  3. Clear-sky shortwave radiative closure for the Cabauw Baseline Surface Radiation Network site, the Netherlands

    NASA Astrophysics Data System (ADS)

    Wang, P.; Knap, W. H.; Kuipers Munneke, P.; Stammes, P.

    2009-04-01

    During the last two decades, several attempts have been made to achieve agreement between clear-sky shortwave broadband irradiance models and surface measurements of direct and diffuse irradiance. In general, models and measurements agreed well for the direct component but closing the gap for diffuse irradiances remained problematic. The number of studies reporting a satisfactory degree of closure for both direct and diffuse irradiance is still limited, which motivated us to perform the study presented here. In this paper a clear-sky shortwave closure analysis is presented for the Baseline Surface Radiation Network (BSRN) site of Cabauw, the Netherlands (51.97 °N, 4.93 °E). The analysis is based on an exceptional period of fine weather in the first half of May 2008 during the Intensive Measurement Period At the Cabauw Tower (IMPACT), an activity of the European Integrated project on Aerosol Cloud Climate and Air Quality Interactions (EUCAARI). Although IMPACT produced a wealth of data, it was decided to conduct the closure analysis using routine measurements only, provided by BSRN and the Aerosol Robotic Network (AERONET), completed with radiosonde obervations. The rationale for this pragmatic approach is the possibility of applying the method presented here to other periods and (BSRN) sites, where routine measurements are readily available, without having to deal with the investments and restrictions of an intensive observation period. The analysis is based on a selection of 72 comparisons on 6 days between BSRN measurements and Doubling Adding KNMI (DAK) model simulations of direct, diffuse, and global irradiance. The data span a wide range of aerosol properties, water vapour columns, and solar zenith angles. The model input consisted of operational Aerosol Robotic Network (AERONET) aerosol products and radiosonde data. On the basis of these data excellent closure was obtained: the mean differences between model and measurements are 2 W/m2 (+0.2%) for direct

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  5. Comparison of W-Plasty vs Traditional Straight-Line Techniques for Primary Paramedian Forehead Flap Donor Site Closure.

    PubMed

    Jáuregui, Emmanuel J; Tummala, Neelima; Seth, Rahul; Arron, Sarah; Neuhaus, Isaac; Yu, Siegrid; Grekin, Roy; Knott, P Daniel

    2016-07-01

    The paramedian forehead flap (PMFF) donor site scar is hard to disguise and may be a source of patient dissatisfaction. To evaluate the aesthetic outcome of W-plasty vs traditional straight-line (SL) closure techniques of the PMFF donor site. A retrospective cohort study was conducted at the University of California, San Francisco Medical Center. Clinical history and operative reports were reviewed for 31 patients who underwent a PMFF procedure performed between November 1, 2011, and May 29, 2014. Blinded photographic analysis of postoperative photographs was performed. The pedicled component of the PMFF was raised primarily with either a W-plasty or traditional SL design. Standard photographs of the donor site, obtained at least 90 days after surgery, were reviewed and scored in a blinded fashion by 4 dermatologic surgeons using a 100-point visual analog scale (from 0 [worst possible outcome] to 100 [best possible outcome]) and a 5-point Likert scale (from very poor to excellent). Interrater reliability was assessed via Cronbach α testing. All 31 forehead flaps survived during this study period; 16 PMFFs were raised with the W-plasty technique and 15 were raised with the SL technique. The W-plasty and SL groups were similar in terms of age, sex, and race/ethnicity (mean [SD] age, 68.4 [12.4] vs 61.8 [11.6] years; 13 [84%] vs 9 [60%] men; and 15 [94%] vs 13 [87%] white). Patients undergoing W-plasty closure had significantly higher mean visual analog scale scores compared with those undergoing SL closure (72.8 [18.3] vs 65.6 [18.1]; P = .03). Mean Likert scale scores for W-plasty were higher than those for SL closure, but the difference was not significant (3.77 [1.02] vs 3.43 [0.98]; P = .08). Overall interrater reliability for the visual analog scale and Likert scale scores were 0.67 and 0.58, respectively. Patients undergoing PMFF donor site closure using a primary W-plasty technique demonstrated better mean scar appearance of the forehead donor site

  6. Silver-coated nylon dressing plus active DC microcurrent for healing of autogenous skin donor sites.

    PubMed

    Malin, Edward W; Galin, Chaya M; Lairet, Kimberley F; Huzar, Todd F; Williams, James F; Renz, Evan M; Wolf, Steven E; Cancio, Leopoldo C

    2013-11-01

    Burn wounds are a significant cause of morbidity and mortality, and improved outcomes are demonstrated with early closure of both primary burn wounds and skin donor sites. Thus, technology that decreases the healing time of burns and donor sites would be potentially lifesaving. We present the results of a single-center, prospective, double-blinded, randomized controlled trial to evaluate the efficacy of silver-coated dressing with active microcurrent in comparison to silver-coated dressing with sham microcurrent on wound-closure time for autogenous skin donor sites. Four hundred five patients were screened for treatment of their donor sites using a silver-coated nylon dressing with either sham or active microcurrent stimulation. Thirty patients were enrolled in the study and then randomized. Of these, 5 patients were removed from analysis due to protocol deviations. Differences in time-to-closure were analyzed using Kaplan-Meier analysis and the proportional hazard regression model. Subjective verbal pain rating scores (0-10; 0, no pain; 10, worst pain) were also recorded. All devices were blinded and programmed at an outside facility, so that every patient had either an active or sham device. The study was unblinded only after the final patient's donor site had healed. All patients achieved donor-site healing before postoperative day 20. The 14 patients in the active microcurrent group [mean, 10.8 (2.9) days; range, 7-15 days] experienced no difference in time to wound healing as compared to the remaining patients in the sham microcurrent group [mean, 11.1 (2.0) days; range, 8-14 days; P = 0.75]. There were no differences in pain from one group compared to the other. None of the donor sites exhibited clinical signs of infection. In a sample size of 25 burn patients, the addition of direct microcurrent to silver-nylon dressings did not decrease time to wound closure of skin donor sites, and it did not show a difference in reported pain levels.

  7. A correlation analysis of percent canopy closure versus TMS spectral response for selected forest sites in the San Juan National Forest, Colorado

    NASA Technical Reports Server (NTRS)

    Butera, M. K.

    1983-01-01

    The correlation of canopy closure with the signal response of individual thematic mapper simulator (TMS) bands for selected forest sites in the San Juan National Forest, Colorado was investigated. Ground truth consisted of a photointerpreted determination of percent canopy closure of 0 to 100 percent for 32 sites. The sites selected were situated on plateaus at an elevation of approximately 3 km with slope or = 10 percent. The predominant tree species were ponderosa pine and aspen. The mean TMS response per band per site was calculated from data acquired by aircraft during mid-September, 1981. A correlation analysis of TMS response vs. canopy closure resulted in the following correlation coefficients for bands 1 through 7, respectively: -0.757, -0.663, -0.666, -0.088, -0.797, -0.763. Two model regressions were applied to the TMS data set to create a map of predicted percent forest canopy closure for the study area. Results indicated percent predictive accuracies of 71, 74, and 57 for percent canopy closure classes of 0-25, 25-75, and 75-100, respectively.

  8. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  9. DETERMINATION OF OPTIMAL TOXICANT LOADING FOR BIOLOGICAL CLOSURE OF A HAZARDOUS WASTE SITE

    EPA Science Inventory

    Information on Phase I and Phase Il of a multitask effort to achieve biological closure of an abandoned hazardous waste site. aste materials, in the form of buried sludges and lagoon wastes, were examined. ptimal loading levels were evaluated on the basis of biodegradative potent...

  10. 75 FR 28655 - Rexam Closure Systems, Inc. a Subsidiary of Rexam PLC Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ..., Inc. a Subsidiary of Rexam PLC Including On-Site Leased Workers From Addeco Employment Services..., applicable to the workers of Rexam Closure Systems, Inc., a subsidiary of Rexam PLC, Hamlet, North Carolina... Rexam Closure Systems, Inc., a subsidiary of Rexam PLC purchased Owens Illinois Manufacturing. Some...

  11. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to

  12. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  13. Completion of five years of safe CO2 injection and transition into the post-closure phase at the Ketzin pilot site

    NASA Astrophysics Data System (ADS)

    Martens, Sonja; Moeller, Fabian; Streibel, Martin; Liebscher, Axel; Ketzin Group

    2014-05-01

    The injection of CO2 at the Ketzin pilot site in Germany ended after five years in August 2013. We present the key results from site operation and outline future activities within the post-closure phase. From June 2008 onwards, a total amount of 67 kt of CO2 was safely injected into a saline aquifer (Upper Triassic sandstone) at a depth of 630 m - 650 m. The CO2 used was mainly of food grade quality (purity > 99.9%). In addition, 1.5 kt of CO2 from the pilot capture facility "Schwarze Pumpe" (power plant CO2 with purity > 99.7%) was injected in 2011. During regular operation, the CO2 was pre-heated on-site to 45°C before injection in order to avoid pressure build-up within the reservoir. During the final months of injection a "cold-injection" experiment with a stepwise decrease of the injection temperature down to 10°C was conducted between March and July 2013. In summer 2013, the injection of a mixture of 95% CO2 and 5% N2 was also tested. After ceasing the injection in August the injection facility and pipeline were removed in December 2013. Geological storage of CO2 at the Ketzin pilot site has so far proceeded in a safe and reliable manner. As a result of one of the most comprehensive R&D programs worldwide, a combination of different geochemical and geophysical monitoring methods is able to detect even small quantities of CO2 and map their spatial extent. After the cessation of CO2 injection a series of activities and further investigations are involved in the post-closure phase. The aim is that Ketzin will for the first time ever close the complete life-time cycle of a CO2 storage site at pilot scale. The five wells (1 injection/observation well, 4 pure observation wells) will be successively abandoned within the next few years while monitoring is continuing. The partial plugging of one observation well in the reservoir section was already completed in fall 2013. The new four-years project COMPLETE (CO2 post-injection monitoring and post-closure phase at

  14. Closure Report for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this Closure Report is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  15. 40 CFR 280.72 - Assessing the site at closure or change-in-service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Assessing the site at closure or change-in-service. 280.72 Section 280.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... indicates no release has occurred. (b) If contaminated soils, contaminated ground water, or free product as...

  16. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less

  17. Occupancy estimation and the closure assumption

    USGS Publications Warehouse

    Rota, Christopher T.; Fletcher, Robert J.; Dorazio, Robert M.; Betts, Matthew G.

    2009-01-01

    1. Recent advances in occupancy estimation that adjust for imperfect detection have provided substantial improvements over traditional approaches and are receiving considerable use in applied ecology. To estimate and adjust for detectability, occupancy modelling requires multiple surveys at a site and requires the assumption of 'closure' between surveys, i.e. no changes in occupancy between surveys. Violations of this assumption could bias parameter estimates; however, little work has assessed model sensitivity to violations of this assumption or how commonly such violations occur in nature. 2. We apply a modelling procedure that can test for closure to two avian point-count data sets in Montana and New Hampshire, USA, that exemplify time-scales at which closure is often assumed. These data sets illustrate different sampling designs that allow testing for closure but are currently rarely employed in field investigations. Using a simulation study, we then evaluate the sensitivity of parameter estimates to changes in site occupancy and evaluate a power analysis developed for sampling designs that is aimed at limiting the likelihood of closure. 3. Application of our approach to point-count data indicates that habitats may frequently be open to changes in site occupancy at time-scales typical of many occupancy investigations, with 71% and 100% of species investigated in Montana and New Hampshire respectively, showing violation of closure across time periods of 3 weeks and 8 days respectively. 4. Simulations suggest that models assuming closure are sensitive to changes in occupancy. Power analyses further suggest that the modelling procedure we apply can effectively test for closure. 5. Synthesis and applications. Our demonstration that sites may be open to changes in site occupancy over time-scales typical of many occupancy investigations, combined with the sensitivity of models to violations of the closure assumption, highlights the importance of properly addressing

  18. Prospective Comparison of Collagen Plug (Angio-Seal™) and Suture-Mediated (the Closer S™) Closure Devices at Femoral Access Sites

    PubMed Central

    Park, Yulri; Choo, Sung Wook; Lee, Sung Hoon; Shin, Sung Wook; Do, Young Soo; Byun, Hong Sik; Park, Kwang Bo; Jeon, Pyoung

    2005-01-01

    Objective Rapid and effective hemostasis at femoral puncture sites minimizes both the hospital stay and patient discomfort. Therefore, a variety of arterial closure devices have been developed to facilitate the closure of femoral arteriotomy. The objective of this prospective study was to compare the efficacy of two different closure devices; a collagen plug device (Angio-Seal) and a suture-mediated closure device (the Closer S). Materials and Methods From March 28, 2003 to August 31, 2004, we conducted a prospective study in which 1,676 cases of 1,180 patients were treated with two different types of closure device. Angio-Seal was used in 961 cases and the Closer S in 715 cases. The efficacy of the closure devices was assessed, as well as complications occurring at the puncture sites. Results Successful immediate hemostasis was achieved in 95.2% of the cases treated with Angio-Seal, and in 89.5% of the cases treated with the Closer S (p < 0.05). The rates of minor and major complications occurring between the two groups were not significantly different. In the Closer S group, we observed four major complications (0.6%), that consisted of one massive retroperitoneal hemorrhage (surgically explored) and three pseudoaneurysms. In the Angio-Seal group, we observed three major complications (0.3%) that consisted of one femoral artery occlusion, one case of infection treated with intravenous antibiotics and one pseudoaneurysm. Conclusion The use of Angio-Seal was found to be more effective than that of the Closer S with regard to the immediate hemostasis of the femoral puncture sites. However, we detected no significant differences in the rate at which complications occurred. PMID:16374083

  19. Rationale and design of a randomised clinical trial comparing vascular closure device and manual compression to achieve haemostasis after diagnostic coronary angiography: the Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial.

    PubMed

    Xhepa, Erion; Byrne, Robert A; Schulz, Stefanie; Helde, Sandra; Gewalt, Senta; Cassese, Salvatore; Linhardt, Maryam; Ibrahim, Tareq; Mehilli, Julinda; Hoppe, Katharina; Grupp, Katharina; Kufner, Sebastian; Böttiger, Corinna; Hoppmann, Petra; Burgdorf, Christof; Fusaro, Massimiliano; Ott, Ilka; Schneider, Simon; Hengstenberg, Christian; Schunkert, Heribert; Laugwitz, Karl-Ludwig; Kastrati, Adnan

    2014-06-01

    Vascular closure devices (VCD) have been introduced into clinical practice with the aim of increasing the procedural efficiency and clinical safety of coronary angiography. However, clinical studies comparing VCD and manual compression have yielded mixed results, and large randomised clinical trials comparing the two strategies are missing. Moreover, comparative efficacy studies between different VCD in routine clinical use are lacking. The Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial is a prospective, randomised clinical trial designed to compare the outcomes associated with the use of VCD or manual compression to achieve femoral haemostasis. The test hypothesis is that femoral haemostasis after coronary angiography achieved using VCD is not inferior to manual compression in terms of access-site-related vascular complications. Patients undergoing coronary angiography via the common femoral artery will be randomised in a 1:1:1 fashion to receive FemoSeal VCD, EXOSEAL VCD or manual compression. The primary endpoint is the incidence of the composite of arterial access-related complications (haematoma ≥5 cm, pseudoaneurysm, arteriovenous fistula, access-site-related bleeding, acute ipsilateral leg ischaemia, the need for vascular surgical/interventional treatment or documented local infection) at 30 days after randomisation. According to power calculations based on non-inferiority hypothesis testing, enrolment of 4,500 patients is planned. The trial is registered at www.clinicaltrials.gov (study identifier: NCT01389375). The safety of VCD as compared to manual compression in patients undergoing transfemoral coronary angiography remains an issue of clinical equipoise. The aim of the ISAR-CLOSURE trial is to assess whether femoral haemostasis achieved through the use of VCD is non-inferior to manual compression in terms of access-site-related vascular complications.

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sloop, Christy

    2013-04-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less

  1. Vascular closure devices in stroke patients receiving tissue plasminogen activator: A retrospective analysis from an academic tertiary medical center and a teaching community hospital stroke database.

    PubMed

    Patil, Mangaladevi S; Jayaraman, Mahesh V; Ahn, Sun H

    2017-06-01

    To determine the safety and effectiveness of vascular closure devices in prevention of access site complications in acute stroke patient receiving intravenous (IV) and/or intra-arterial (IA) IV tissue plasminogen activator (tPA). All patients with acute stroke onset treated with IV and/or IA tPA closed with vascular closure device and adult age (>18 years) were identified from an academic tertiary medical center and a teaching community hospital stroke database for 9 years (from March 2005 to June 2014). A total of 69 patients were included in the study. The mean age was 68.86±16.70 years and 49.2% female. All accesses were under fluoroscopic guidance into the right common femoral artery. We observed a 5.8% complication rate in patients receiving IV and/or IA tPA closed with vascular closure device. Access site complications included 3 cases of hematoma and 1 case of residual oozing. One patient required transfusion due to access site hematoma. Three patients were on aspirin and heparin and 1 was on no prior anticoagulation. Vascular closure device access site hemorrhagic complication rate in those receiving IV and/or IA tPA is low and similar to reported rates in those not receiving thrombolytic therapy. Vascular closure device use in patients receiving thrombolytic therapy is safe and effectively achieves hemostasis. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathews, S.

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less

  3. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehlecke, R. F.

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less

  4. Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackey, H.

    1998-07-01

    Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner.

  5. Planned secondary wound closure at the circular stapler insertion site after laparoscopic gastric bypass reduces postoperative morbidity, costs, and hospital stay.

    PubMed

    Vetter, Diana; Raptis, Dimitri Aristotle; Giama, Mira; Hosa, Hanna; Muller, Markus K; Nocito, Antonio; Schiesser, Marc; Moos, Rudolf; Bueter, Marco

    2017-12-01

    The aims of the present study were to assess whether planned secondary wound closure at the insertion site of the circular stapler reduces wound infection rate and postoperative morbidity after laparoscopic Roux-en-Y gastric bypass (RYGB) and to identify independent predictive factors increasing the risk for wound infections after RYGB. This paper is a retrospective single-center analysis of a prospectively collected database of 1400 patients undergoing RYGB surgery in circular technique between June 2000 and June 2016. Planned secondary wound closure at the circular stapler introduction site was performed at postoperative day 3 in 291 (20.8%) consecutive patients and compared to a historical control of 1109 (79.2%) consecutive patients with primary wound closure. Independent predictive factors for wound infection were assessed by multivariable analysis. Secondary wound closure significantly decreased wound infection rate from 9.3% (103/1109) to 1% (3/291) (p < 0.001) leading to a shorter hospital stay (mean 9 (SD8) vs. 7 days (SD2), p < 0.001), lower costs (p = 0.039), and reduced postoperative morbidity (mean 90-day Comprehensive Complication Index (CCI) 7.4 (SD14.0) vs. 5.1 (SD11.1) p = 0.008) when compared to primary wound closure. Primary wound closure, dyslipidemia, and preoperative gastritis were independent predictive risk factors for developing wound infections both in the univariate (p < 0.001; p = 0.048; p = 0.003) and multivariable analysis (p < 0.001; p = 0.040; p = 0.012). Further, on multivariable analysis, the female gender was a predictive factor (p = 0.034) for wound infection development. Secondary wound closure at the circular stapler introduction site in laparoscopic RYGB significantly reduces the overall wound infection rate as well as postoperative morbidity, costs, and hospital stay when compared to primary wound closure.

  6. Resource Conservation and Recovery Act closure report: Area 2 Bitcutter and Postshot Containment Shops Injection Wells, Correction Action Unit 90

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less

  7. Port closure techniques.

    PubMed

    Shaher, Z

    2007-08-01

    Laparoscopic trocars do create wounds. This article aims to review and list different techniques used for closure of the fascia incision at trocar sites. A literature search was performed for articles dealing with closure techniques. The author searched this subject in English on Medline by combining the words "trocar" and "hernia," as well as "Deschamps" and "Reverdin." All articles reporting techniques with their references were reviewed. The articles described many techniques in addition to classical closure using curved needles, including Grice needle, Maciol needles, Endoclose device, Carter-Thomason device, Tahoe ligature device, Endo-Judge device, eXit puncture closure device, Lowsley retractor, spinal cord needles, dual hemostat, suture carrier, Riverdin and Deschamps needles, and Gore-Tex closure device. Three main groups of techniques were found with favor of extracorporeal manipulations under direct visualization. Old methods are sufficient and cost-effective.

  8. Development of molecular closures for the reference interaction site model theory with application to square-well and Lennard-Jones homonuclear diatomics.

    PubMed

    Munaò, Gianmarco; Costa, Dino; Caccamo, Carlo

    2016-10-19

    Inspired by significant improvements obtained for the performances of the polymer reference interaction site model (PRISM) theory of the fluid phase when coupled with 'molecular closures' (Schweizer and Yethiraj 1993 J. Chem. Phys. 98 9053), we exploit a matrix generalization of this concept, suitable for the more general RISM framework. We report a preliminary test of the formalism, as applied to prototype square-well homonuclear diatomics. As for the structure, comparison with Monte Carlo shows that molecular closures are slightly more predictive than their 'atomic' counterparts, and thermodynamic properties are equally accurate. We also devise an application of molecular closures to models interacting via continuous, soft-core potentials, by using well established prescriptions in liquid state perturbation theories. In the case of Lennard-Jones dimers, our scheme definitely improves over the atomic one, providing semi-quantitative structural results, and quite good estimates of internal energy, pressure and phase coexistence. Our finding paves the way to a systematic employment of molecular closures within the RISM framework to be applied to more complex systems, such as molecules constituted by several non-equivalent interaction sites.

  9. WHAT ARE THE BEST MEANS TO ASSESS CONTAMINANT TRANSPORT AND BIODEGRADATION AND MOVE TOWARD CLOSURE, USING APPROPRIATE SITE-SPECIFIC RISK EVALUATIONS?

    EPA Science Inventory

    Site remedy and closure decisions are made from a mixture of site data, literature values, and model results. Often assessment of this information is difficult for State Agency case managers because conventional approaches to site characterization do not yield a clear and strai...

  10. 2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. T. Lindsey, A. L. Johnson

    2010-09-30

    This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

  11. Co-activated yet disconnected-Neural correlates of eye closures when trying to stay awake.

    PubMed

    Ong, Ju Lynn; Kong, Danyang; Chia, Tiffany T Y; Tandi, Jesisca; Thomas Yeo, B T; Chee, Michael W L

    2015-09-01

    Spontaneous eye-closures that herald sleep onset become more frequent when we are sleep deprived. Although these are typically associated with decreased responsiveness to external stimuli, it is less clear what occurs in the brain at these transitions to drowsiness and light sleep. To investigate this, task-free fMRI of sleep-deprived participants was acquired. BOLD activity associated with periods of spontaneously occurring eye closures were marked and analyzed. We observed concurrent and extensive hypnagogic co-activation of the extrastriate visual, auditory, and somatosensory cortices as well as the default mode network, consistent with internal sensory activity without external stimulation. Co-activation of fronto-parietal areas known to mediate attentional control could correspond with participants resisting sleep or additional engagement of mental imagery. This constellation of signal changes differed from those elicited by cued eye closures of similar duration and distribution in the same, rested participants. They also differ from signal changes associated with mind-wandering and consolidated light sleep. Concurrent with the observed event-related changes, eye closures elicited additional reduction in functional connectivity within nodes of the DMN and DAN, superposed on already reduced connectivity associated with sleep deprivation. There was concurrent deactivation of the thalamus during eye-closure during the sleep-deprived state but almost similar changes occurred in the well-rested state that may also be relevant. These findings highlight the dynamic shifts in brain activity and connectivity at border between wakefulness and sleep. Copyright © 2015. Published by Elsevier Inc.

  12. 40 CFR 264.197 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 264.197 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... as hazardous waste, unless § 261.3(d) of this chapter applies. The closure plan, closure activities...

  13. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  14. Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less

  15. Temporal and Spatial Variations of Energy Balance Closure across FLUXNET Research Sites

    NASA Astrophysics Data System (ADS)

    Chui, T. F. M.; CUI, W.

    2017-12-01

    The surface energy balance at most measurement sites is not closed and the reason behind the discrepancy between available energy and output energy is always under debate. Based on the FLUXNET database and MODIS product, this study analyzed the energy balance closure (EBC) of around 100 sites covering nine vegetation types in different latitudes and explored the possible relationships between EBC and environmental variables. The results showed that EBC is closely related with precipitation, friction velocity, vapor pressure deficit (VPD) and enhanced vegetation index (EVI). The EBC, computed at 30-min intervals, of different land covers increased with the friction velocity and was highest when the air temperature was between 10 and 20 and the VPD was less than 5 hPa. There was no obvious difference in the seasonal variation of EBC among different land covers. However, for most land covers in the boreal region, the worst EBC usually occurred in November, December and January when EVI was minimum, and the best closure occurred in June and July when EVI was maximum. Moreover, the EBC in the lower latitude was better than that in higher latitude, which could be related with the large uncertainty in ground heat flux measurement due to soil freezing and thawing in the high latitude. This study evaluated the temporal and spatial variations of EBC and investigated the physical explanation behind the energy imbalance based on vegetation growth and climates in different latitudes. It shed some insights regarding the energy imbalance issue and the energy flux between the atmosphere and land surface.

  16. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 274: Septic Systems, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-09-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated

  18. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  19. Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-02-24

    This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

  20. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less

  1. Distally based sural neuro-fasciocutaneous perforator flap for foot and ankle reconstruction: Surgical modifications for flap pedicle and donor site closure without skin graft.

    PubMed

    Chi, Zhenglin; Chen, Yiheng; Chu, Tinggang; Gao, Weiyang; Li, Zhijie; Yan, Hede; Song, Yonghuan

    2018-02-01

    The conventional procedure of the sural neuro-fasciocutaneous flap enables the supply of blood and venous drainage by increasing the width of the adipofascial tissue and preserving tiny venous return routes. Moreover, skin graft is a common method for donor site closure, which may lead to some complications and influence the aesthetic appearance. We report modifications for a distally based sural neuro-fasciocutaneous perforator flap and a relaying flap for donor site closure without skin graft. Twelve patients undergoing the modified flap for foot and ankle reconstruction were included in this study between 2014 and 2016. A peroneal-based perforator, a superficial vein, and the vascular axis of the sural nerve were included in the pedicle. A Z-shape skin incision was performed to explore the perforator vessels and a relaying island perforator flap was used to close the donor site. All flaps survived completely without necrosis. The area of the flaps ranged from 16 × 8 cm to 30 × 15 cm. The diameter width of the pedicle ranged from 1.0 to 2.0 cm. A relaying perforator island flap was used in 10 cases for donor site closure and no skin graft was performed. There were no serious donor site complications. All patients were satisfied with the aesthetic outcome postoperatively at the final follow-up. The distally based sural neuro-fasciocutaneous perforator flap is considered a reliable method for foot and ankle reconstruction. The modification for flap pedicle and donor site closure method without skin graft should be recommended. Copyright © 2017. Published by Elsevier Ltd.

  2. In vivo carotid artery closure by laser activation of hyaluronan-embedded gold nanorods

    NASA Astrophysics Data System (ADS)

    Matteini, Paolo; Ratto, Fulvio; Rossi, Francesca; Rossi, Giacomo; Esposito, Giuseppe; Puca, Alfredo; Albanese, Alessio; Maira, Giulio; Pini, Roberto

    2010-07-01

    We prove the first application of near-infrared-absorbing gold nanorods (GNRs) for in vivo laser closure of a rabbit carotid artery. GNRs are first functionalized with a biopolymeric shell and then embedded in hyaluronan, which gives a stabilized and handy laser-activable formulation. Four rabbits undergo closure of a 3-mm longitudinal incision performed on the carotid artery by means of a 810-nm diode laser in conjunction with the topical application of the GNRs composite. An effective surgery is obtained by using a 40-W/cm2 laser power density. The histological and electron microscopy evaluation after a 30-day follow-up demonstrates complete healing of the treated arteries with full re-endothelization at the site of GNRs application. The absence of microgranuloma formation and/or dystrophic calcification is evidence that no host reaction to nanoparticles interspersed through the vascular tissue occurred. The observation of a reshaping and associated blue shift of the NIR absorption band of GNRs after laser treatment supports the occurrence of a self-terminating process, and thus of additional safety of the minimally invasive laser procedure. This study underlines the feasibility of using GNRs for in vivo laser soldering applications, which represents a step forward toward the introduction of nanotechnology-based therapies in minimally invasive clinical practices.

  3. Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment

    PubMed Central

    Ribeiro, Gerson Luiz Ulema; Jacob, Helder B.

    2016-01-01

    ABSTRACT Introduction: Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. Objective: This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts. PMID:27275623

  4. Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment.

    PubMed

    Ribeiro, Gerson Luiz Ulema; Jacob, Helder B

    2016-01-01

    Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts.

  5. Closure Report for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss and Catherine Birney

    2011-05-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 544 are located within Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada National Security Site. Corrective Action Unit 544 comprises the following CASs: • 02-37-08,more » Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CASs within CAU 544 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 544 issued by the Nevada Division of Environmental Protection.« less

  6. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, andmore » 528.« less

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less

  9. Feasibility study from a randomized controlled trial of standard closure of a stoma site vs biological mesh reinforcement.

    PubMed

    2016-09-01

    Hernia formation occurs at closed stoma sites in up to 30% of patients. The Reinforcement of Closure of Stoma Site (ROCSS) randomized controlled trial is evaluating whether placement of biological mesh during stoma closure safely reduces hernia rates compared with closure without mesh, without increasing surgical or wound complications. This paper aims to report recruitment, deliverability and safety from the internal feasibility study. A multicentre, patient and assessor blinded, randomized controlled trial, delivered through surgical trainee research networks. A 90-patient internal feasibility study assessed recruitment, randomization, deliverability and early (30 day) safety of the novel surgical technique (ClinicalTrials.gov registration number NCT02238964). The feasibility study recruited 90 patients from the 104 considered for entry (45 to mesh, 45 to no mesh). Seven of eight participating centres randomized patients within 30 days of opening. Overall, 41% of stomas were created for malignant disease and 73% were ileostomies. No mesh-specific complications occurred. Thirty-one postoperative adverse events were experienced by 31 patients, including surgical site infection (9%) and postoperative ileus (6%). One mesh was removed for re-access to the abdominal cavity, for reasons unrelated to the mesh. Independent review by the Data Monitoring and Ethics Committee of adverse event data by treatment allocation found no safety concerns. Multicentre randomization to this trial of biological mesh is feasible, with no early safety concerns. Progression to the full Phase III trial has continued. ROCSS shows that trainee research networks can efficiently develop and deliver complex interventional surgical trials. Colorectal Disease © 2016 The Association of Coloproctology of Great Britain and Ireland.

  10. Eye-closure-triggered paroxysmal activity and cognitive impairment: a case report.

    PubMed

    Termine, Cristiano; Rubboli, Guido; Veggiotti, Pierangelo

    2006-01-01

    To study the neuropsychological status of an epileptic patient presenting with epileptic activity triggered by eye closure in a 14-year follow-up period. The patient was studied at 12 and 26 years of age; during this period he underwent periodical clinical evaluations and EEG investigations; brain magnetic resonance imaging (MRI) was performed at 12 years of age. A neuropsychological assessment was carried out both at 12 years of age (T0) and at 26 years of age. At T0 and T1, neuropsychological tests (digits and words span, graphoestesia, reactions time to auditory stimuli, sentences repetition, words repetition, digital gnosis, backward counting [i.e.,100-0]) were performed during video-EEG monitoring either with eyes closed or with eyes open, to evaluate possible transitory effects related to ongoing epileptic activity. Moreover, at T0 the patient underwent Wechsler Intelligence Scale for Children-Revised, and at T1 to Wechsler Adult Intelligence Scale-Revised. EEG recordings showed continuous epileptic activity triggered by eye closure, disappearing only with eyes opening, both at T0 and T1 (in this latter case, anteriorly predominant). The results of neuropsychological assessment during eyes closed as compared to performances with eyes open did not show significant differences, at T0 as well as at T1. Wechsler Intelligence scales showed a deterioration of performances at T1 with respect to T0; in addition, at T1, attention and short-term memory abnormalities, impairment in facial recognition and block design, and defective results in Continuous Performance Test and Wisconsin Card Sorting Test were observed. Lack of differences between the results of neuropsychological tests performed with eyes closed as compared to the eyes open condition suggests that in our patient epileptic activity did not cause transitory cognitive abnormalities. Deterioration of Wechsler Intelligence Scales in the follow-up period might be interpreted as the result of a disruption of

  11. 75 FR 34172 - Rexam Closure Systems, Inc., a Subsidiary of Rexam PLC, Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ..., Inc., a Subsidiary of Rexam PLC, Including On-Site Leased Workers From Addeco Employment Services and... PLC, Hamlet, North Carolina. The notice was published in the Federal Register on April 23, 2010 (75 FR... at the Hamlet, North Carolina location of Rexam Closure Systems, Inc., a subsidiary of Rexam PLC. The...

  12. Letter Report to Address Comments on the Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada, Revision 0, March 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-03-17

    The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closuremore » documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.« less

  13. Full closure strategic analysis.

    DOT National Transportation Integrated Search

    2014-07-01

    The full closure strategic analysis was conducted to create a decision process whereby full roadway : closures for construction and maintenance activities can be evaluated and approved or denied by CDOT : Traffic personnel. The study reviewed current...

  14. THE INTEGRATION OF A PROPOSED ZONE CLOSURE APPROACH FOR THE PLUTONIUM FINISHING PLANT (PFP) DECOMMISSIONING & THE PFP ZONE HANFORD SITE WASHINGTON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2005-02-23

    The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less

  15. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014–September 2015), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were

  17. Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    2000-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L

  18. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse and redevelopment of BRAC federal properties. When the BRAC program began in the early 1990s, EPA worked with DoD and the states to identify uncontaminated areas and these parcels were immediately made available for reuse. Since then EPA has worked with DoD to clean up the contaminated portions of bases. These are usually parcels that were training ranges, landfills, maintenance facilities and other past waste-disposal areas. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.This data layer shows Superfund Sites that are located at BRAC Federal Facilities. Additional Superfund sites and other BRAC sites (those that are not Superfund sites) are included in other data layers as part of this web service.BRAC Superfund Sites shown in this web service are derived from the epa.gov website and include links to the relevant web pages within the attribute table. Data about BRAC Superfund Sites are located on their own EPA web pages, and CIMC links to those pages. The CIMC web service

  19. Intrasocket reactive soft tissue for primary closure after augmentation of extraction sites with severe bone loss before implant placement.

    PubMed

    Mardinger, Ofer; Chaushu, Gavriel; Ghelfan, Oded; Nissan, Joseph

    2009-06-01

    The normal bone resorption after tooth extraction can be significantly aggravated in the case of pre-existing severe bone loss and chronic infection. Bone augmentation procedures have been proposed, but they require adequate closure of soft tissues. We propose the use of intrasocket reactive tissue to cover extraction sites augmented by bovine bone mineral graft to promote the success of the graft procedure. The study included 24 patients with severe bone loss and chronic pathology in 27 sites. The intrasocket reactive soft tissue was elevated from the bony walls in a subperiosteal plane. Porous bovine or allograft bone mineral was placed in the extraction site without membranes, and the intrasocket reactive soft tissue was sutured over the grafting material to seal the coronal portion of the socket. Twenty-seven implants were placed 6 months after bone augmentation. Healing progressed uneventfully. Postoperative morbidity was minimal. There was no leakage or infection of the grafting material. The mean time to implant placement was 7.8 months. Supplemental augmentation was not needed. There were no implant failures. Follow-up ranged from 6 to 36 months (mean, 15 months). All implants were rehabilitated with fixed prostheses. Intrasocket reactive soft tissue can be used predictably to obtain primary closure of augmented extraction sites with severe bone loss with minimal postoperative morbidity.

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less

  3. Perforator flap based on the third perforator of the profunda femoris artery (PFA)-assisted closure of the free vertical posteromedial thigh (vPMT) flap donor site.

    PubMed

    Scaglioni, Mario F; Barth, Andrè A; Chen, Yen-Chou

    2018-06-19

    The primary closure of the vertical posteromedial thigh (vPMT) free flap donor site is very important to minimize donor site morbidity and maximize cosmetic appearance. However, sometimes due to the dimension of the defect, a vPMT flap is wider than the 8-10 cm requirement. The authors report their experience with the third perforator of the profunda femoris artery (PFA) during the vPMT free flap donor-site closure. Between January 2016 and December 2017, 5 patients underwent reconstruction of lower extremity (2 pts.) and head and neck (3 pts.) area with the free vPMT flaps. Attempts to close the vPMT free flap donor site directly failed due to the flaps' width (average: 11 cm) and pedicled perforator flaps based on the third perforator of the PFA at the distal thigh were harvested to close the defect primary without the use of a skin graft. The size of perforator flap based on 3rd perforator of PFA was on average 6 cm × 4 cm (ranged: 4-8 cm × 3-6 cm). In all patients, the third perforator of the PFA was identified and the perforator diameter was on average 2.0 mm (range, 1.8-2.2 mm). All perforators were musculocutaneous and single. The dimensions of the flaps were on average 6 cm × 4 cm (range: 4 to 8 cm × 3 to 6 cm). All flaps healed uneventfully without complications and the patients were satisfied with cosmetic and functional results at 6 months follow-up. The third perforator of the PFA may be an option to ensure primary closure of the PMT flap donor site, when a larger flap for reconstruction is needed with subsequent impossibility to achieve primary closure of the donor site. © 2018 Wiley Periodicals, Inc.

  4. Deep inferior epigastric artery perforator flap donor-site closure with cannula-assisted, limited undermining, and progressive high-tension sutures versus standard abdominoplasty: complications, sensitivity, and cosmetic outcomes.

    PubMed

    Visconti, Giuseppe; Tomaselli, Federica; Monda, Anna; Barone-Adesi, Liliana; Salgarello, Marzia

    2015-01-01

    In deep inferior epigastric artery perforator (DIEP) flap breast reconstruction, abdominal donor-site cosmetic and sensibility outcomes and the closure technique have drawn little attention in the literature, with many surgeons still following the principles of standard abdominoplasty. In this article, the authors report their experience with the cannula-assisted, limited undermining, and progressive high-tension suture ("CALP") technique of DIEP donor-site closure compared with standard abdominoplasty. Between December of 2008 and January of 2013, 137 consecutive women underwent DIEP flap breast reconstruction. Of these, 82 patients (between December of 2008 and November of 2011) underwent DIEP flap donor-site closure by means of standard abdominoplasty (control group) and 55 patients (from December of 2011 to January of 2013) by means of cannula-assisted, limited undermining, and progressive high-tension suture (study group). The abdominal drainage daily output, donor-site complications, abdominal skin sensitivity at 1-year follow-up, cosmetic outcomes, and patient satisfaction were recorded and analyzed statistically. Daily drainage output was significantly lower in the study group. Donor-site complications were significantly higher in the control group (37.8 percent versus 9 percent). Seroma and wound healing problems were experienced in the control group. Abdominal skin sensibility was better preserved in the study group. Overall, abdominal wall aesthetic outcomes were similar in both groups, except for scar quality (better in the study group). According to the authors' experience, cannula-assisted, limited undermining, and progressive high-tension suture should be always preferred to standard abdominoplasty for DIEP donor-site closure to reduce the complication rate to improve abdominal skin sensitivity and scar quality. Therapeutic, II.

  5. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dave Madsen

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less

  6. Risk Assessment Approach for the Hanford Site River Corridor Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomson, J.E.; Weiss, S.G.; Sands, J.P.

    2007-07-01

    The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees

  7. Silicone absorption of elastomeric closures--an accelerated study.

    PubMed

    Degrazio, F L; Hlobik, T; Vaughan, S

    1998-01-01

    There is a trend in the parenteral industry to move from the use of elastomeric closures which are washed, siliconized, dried and sterilized in-house at the pharmaceutical manufacturers' site to pre-prepared closures purchased from the closure supplier. This preparation can consist of washing to reduce particle-load and bioburden, siliconization, placement in ready-to-sterilize bags and may eventually extend to sterilization by steam autoclave or gamma irradiation. Since silicone oil lubrication is critical to the processability/machinability of closures, research was designed to investigate this phenomenon in closures prepared using the Westar RS (Ready-to-Sterilize) process. This paper presents the data gathered in a study of the characteristic of silicone absorption into elastomeric closures under accelerated conditions. Variables such as silicone viscosity, rubber formulation, effect of sterilization and others are considered.

  8. Citizen Contributions to the Closure of High-Level Waste (HLW) Tanks 18 and 19 at the Department of Energy's (DOE) Savannah River Site (SRS) - 13448

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawless, W.F.

    2013-07-01

    Citizen involvement in DOE's decision-making for the environmental cleanup from DOE's management of its nuclear wastes across the DOE complex has had a positive effect on the cleanup of its SRS site, characterized by an acceleration of cleanup not only for the Transuranic wastes at SRS, but also for DOE's first two closures of HLW tanks, both of which occurred at SRS. The Citizens around SRS had pushed successfully for the closures of Tanks 17 and 20 in 1997, becoming the first closures of HLW tanks under regulatory guidance in the USA. However, since then, HLW tank closures ceased duemore » to a lawsuit, the application of new tank clean-up technology, interagency squabbling between DOE and NRC over tank closure criteria, and finally and almost fatally, from budget pressures. Despite an agreement with its regulators for the closure of Tanks 18 and 19 by the end of calendar year 2012, the outlook in Fall 2011 to close these two tanks had dimmed. It was at this point that the citizens around SRS became reengaged with tank closures, helping DOE to reach its agreed upon milestone. (authors)« less

  9. Closure of the R Reactor Disassembly Basin at the SRS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austin, W.E.

    The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at R-Reactor Disassembly Basin and will continue with the P and C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds or to prevent ground water impact. The closure will be accomplished under CERCLA.« less

  10. Functional Dissection of the Bipartite Active Site of the Class I Coenzyme A (CoA)-Transferase Succinyl-CoA:Acetate CoA-Transferase.

    PubMed

    Murphy, Jesse R; Mullins, Elwood A; Kappock, T Joseph

    2016-01-01

    Coenzyme A (CoA)-transferases catalyze the reversible transfer of CoA from acyl-CoA thioesters to free carboxylates. Class I CoA-transferases produce acylglutamyl anhydride intermediates that undergo attack by CoA thiolate on either the internal or external carbonyl carbon atoms, forming distinct tetrahedral intermediates <3 Å apart. In this study, crystal structures of succinyl-CoA:acetate CoA-transferase (AarC) from Acetobacter aceti are used to examine how the Asn347 carboxamide stabilizes the internal oxyanion intermediate. A structure of the active mutant AarC-N347A bound to CoA revealed both solvent replacement of the missing contact and displacement of the adjacent Glu294, indicating that Asn347 both polarizes and orients the essential glutamate. AarC was crystallized with the nonhydrolyzable acetyl-CoA (AcCoA) analog dethiaacetyl-CoA (1a) in an attempt to trap a closed enzyme complex containing a stable analog of the external oxyanion intermediate. One active site contained an acetylglutamyl anhydride adduct and truncated 1a, an unexpected result hinting at an unprecedented cleavage of the ketone moiety in 1a. Solution studies confirmed that 1a decomposition is accompanied by production of near-stoichiometric acetate, in a process that seems to depend on microbial contamination but not AarC. A crystal structure of AarC bound to the postulated 1a truncation product (2a) showed complete closure of one active site per dimer but no acetylglutamyl anhydride, even with acetate added. These findings suggest that an activated acetyl donor forms during 1a decomposition; a working hypothesis involving ketone oxidation is offered. The ability of 2a to induce full active site closure furthermore suggests that it subverts a system used to impede inappropriate active site closure on unacylated CoA.

  11. Functional Dissection of the Bipartite Active Site of the Class I Coenzyme A (CoA)-Transferase Succinyl-CoA:Acetate CoA-Transferase

    PubMed Central

    Murphy, Jesse R.; Mullins, Elwood A.; Kappock, T. Joseph

    2016-01-01

    Coenzyme A (CoA)-transferases catalyze the reversible transfer of CoA from acyl-CoA thioesters to free carboxylates. Class I CoA-transferases produce acylglutamyl anhydride intermediates that undergo attack by CoA thiolate on either the internal or external carbonyl carbon atoms, forming distinct tetrahedral intermediates <3 Å apart. In this study, crystal structures of succinyl-CoA:acetate CoA-transferase (AarC) from Acetobacter aceti are used to examine how the Asn347 carboxamide stabilizes the internal oxyanion intermediate. A structure of the active mutant AarC-N347A bound to CoA revealed both solvent replacement of the missing contact and displacement of the adjacent Glu294, indicating that Asn347 both polarizes and orients the essential glutamate. AarC was crystallized with the nonhydrolyzable acetyl-CoA (AcCoA) analog dethiaacetyl-CoA (1a) in an attempt to trap a closed enzyme complex containing a stable analog of the external oxyanion intermediate. One active site contained an acetylglutamyl anhydride adduct and truncated 1a, an unexpected result hinting at an unprecedented cleavage of the ketone moiety in 1a. Solution studies confirmed that 1a decomposition is accompanied by production of near-stoichiometric acetate, in a process that seems to depend on microbial contamination but not AarC. A crystal structure of AarC bound to the postulated 1a truncation product (2a) showed complete closure of one active site per dimer but no acetylglutamyl anhydride, even with acetate added. These findings suggest that an activated acetyl donor forms during 1a decomposition; a working hypothesis involving ketone oxidation is offered. The ability of 2a to induce full active site closure furthermore suggests that it subverts a system used to impede inappropriate active site closure on unacylated CoA. PMID:27242998

  12. Functional dissection of the bipartite active site of the class I coenzyme A (CoA)-transferase succinyl-CoA:acetate CoA-transferase

    DOE PAGES

    Murphy, Jesse R.; Mullins, Elwood A.; Kappock, T. Joseph

    2016-05-23

    Coenzyme A (CoA)-transferases catalyze the reversible transfer of CoA from acyl-CoA thioesters to free carboxylates. Class I CoA-transferases produce acylglutamyl anhydride intermediates that undergo attack by CoA thiolate on either the internal or external carbonyl carbon atoms, forming distinct tetrahedral intermediates <3 Å apart. Here in this study, crystal structures of succinyl-CoA:acetate CoA-transferase (AarC) from Acetobacter aceti are used to examine how the Asn347 carboxamide stabilizes the internal oxyanion intermediate. A structure of the active mutant AarC-N347A bound to CoA revealed both solvent replacement of the missing contact and displacement of the adjacent Glu294, indicating that Asn347 both polarizes andmore » orients the essential glutamate. AarC was crystallized with the nonhydrolyzable acetyl-CoA (AcCoA) analog dethiaacetyl-CoA (1a) in an attempt to trap a closed enzyme complex containing a stable analog of the external oxyanion intermediate. One active site contained an acetylglutamyl anhydride adduct and truncated 1a, an unexpected result hinting at an unprecedented cleavage of the ketone moiety in 1a. Solution studies confirmed that 1a decomposition is accompanied by production of near-stoichiometric acetate, in a process that seems to depend on microbial contamination but not AarC. A crystal structure of AarC bound to the postulated 1a truncation product (2a) showed complete closure of one active site per dimer but no acetylglutamyl anhydride, even with acetate added. These findings suggest that an activated acetyl donor forms during 1a decomposition; a working hypothesis involving ketone oxidation is offered. Finally, the ability of 2a to induce full active site closure furthermore suggests that it subverts a system used to impede inappropriate active site closure on unacylated CoA.« less

  13. Active Site Flexibility of Mycobacterium tuberculosis Isocitrate Lyase in Dimer Form.

    PubMed

    Lee, Yie-Vern; Choi, Sy Bing; Wahab, Habibah A; Choong, Yee Siew

    2017-09-25

    Tuberculosis (TB) still remains a global threat due to the emergence of a drug-resistant strain. Instead of focusing on the drug target of active stage TB, we are highlighting the isocitrate lyase (ICL) at the dormant stage TB. ICL is one of the persistent factors for Mycobacterium tuberculosis (MTB) to survive during the dormant phase. In addition, the absence of ICL in human has made ICL a potential drug target for TB therapy. However, the dynamic details of ICL which could give insights to the ICL-ligand interaction have yet to be solved. Therefore, a series of ICL dimer dynamics studies through molecular dynamics simulation were performed in this work. The ICL active site entrance gate closure is contributed to by hydrogen bonding and electrostatic interactions with the C-terminal. Analysis suggested that the open-closed behavior of the ICL active site entrance depends on the type of ligand present in the active site. We also observed four residues (Ser91, Asp108, Asp153, and Cys191) which could possibly be the nucleophiles for nucleophilic attack on the cleavage of isocitrate at the C 2 -C 3 bond. We hope that the elucidation of ICL dynamics can benefit future works such as lead identification or antibody design against ICL for TB therapeutics.

  14. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Alvarado, Juan

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110;more » and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.« less

  15. An active site-tail interaction in the structure of hexahistidine-tagged Thermoplasma acidophilum citrate synthase

    DOE PAGES

    Murphy, Jesse R.; Donini, Stefano; Kappock, T. Joseph

    2015-10-01

    Citrate synthase (CS) plays a central metabolic role in aerobes and many other organisms. The CS reaction comprises two half-reactions: a Claisen aldol condensation of acetyl-CoA (AcCoA) and oxaloacetate (OAA) that forms citryl-CoA (CitCoA), and CitCoA hydrolysis. Protein conformational changes that `close' the active site play an important role in the assembly of a catalytically competent condensation active site. CS from the thermoacidophile Thermoplasma acidophilum (TpCS) possesses an endogenous Trp fluorophore that can be used to monitor the condensation reaction. The 2.2 Å resolution crystal structure of TpCS fused to a C-terminal hexahistidine tag (TpCSH6) reported here is an `open'more » structure that, when compared with several liganded TpCS structures, helps to define a complete path for active-site closure. One active site in each dimer binds a neighboring His tag, the first nonsubstrate ligand known to occupy both the AcCoA and OAA binding sites. Solution data collectively suggest that this fortuitous interaction is stabilized by the crystalline lattice. In conclusion, as a polar but almost neutral ligand, the active site-tail interaction provides a new starting point for the design of bisubstrate-analog inhibitors of CS.« less

  16. An active site-tail interaction in the structure of hexahistidine-tagged Thermoplasma acidophilum citrate synthase.

    PubMed

    Murphy, Jesse R; Donini, Stefano; Kappock, T Joseph

    2015-10-01

    Citrate synthase (CS) plays a central metabolic role in aerobes and many other organisms. The CS reaction comprises two half-reactions: a Claisen aldol condensation of acetyl-CoA (AcCoA) and oxaloacetate (OAA) that forms citryl-CoA (CitCoA), and CitCoA hydrolysis. Protein conformational changes that `close' the active site play an important role in the assembly of a catalytically competent condensation active site. CS from the thermoacidophile Thermoplasma acidophilum (TpCS) possesses an endogenous Trp fluorophore that can be used to monitor the condensation reaction. The 2.2 Å resolution crystal structure of TpCS fused to a C-terminal hexahistidine tag (TpCSH6) reported here is an `open' structure that, when compared with several liganded TpCS structures, helps to define a complete path for active-site closure. One active site in each dimer binds a neighboring His tag, the first nonsubstrate ligand known to occupy both the AcCoA and OAA binding sites. Solution data collectively suggest that this fortuitous interaction is stabilized by the crystalline lattice. As a polar but almost neutral ligand, the active site-tail interaction provides a new starting point for the design of bisubstrate-analog inhibitors of CS.

  17. Effect of Live Poultry Market Closure on Avian Influenza A(H7N9) Virus Activity in Guangzhou, China, 2014

    PubMed Central

    Yuan, Jun; Lau, Eric H.Y.; Li, Kuibiao; Leung, Y.H. Connie; Yang, Zhicong; Xie, Caojun; Liu, Yufei; Liu, Yanhui; Ma, Xiaowei; Liu, Jianping; Li, Xiaoquan; Chen, Kuncai; Luo, Lei; Di, Biao; Cowling, Benjamin J.; Leung, Gabriel M.; Peiris, Malik

    2015-01-01

    We assessed the effect of closing live poultry markets in China on influenza A(H7N9) virus detection and viability. Intensive sampling was carried out before, during, and after a 2-week citywide market closure; the markets were cleaned and disinfected at the beginning of the closure period. Swab samples were collected at different sites within the markets and tested for H7N9 by real-time reverse transcription PCR and culture. During the closure, H7N9 viral RNA detection and isolation rates in retail markets decreased by 79% (95% CI 64%–88%) and 92% (95% CI 58%–98%), respectively. However, viable H7N9 virus could be cultured from wastewater samples collected up to 2 days after the market closure began. Our findings indicates that poultry workers and the general population are constantly exposed to H7N9 virus at these markets and that market closure and disinfection rapidly reduces the amount of viable virus. PMID:26402310

  18. CIRSE Vascular Closure Device Registry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reekers, Jim A., E-mail: j.a.reekers@amc.uva.nl; Mueller-Huelsbeck, Stefan; Libicher, Martin

    2011-02-15

    Purpose: Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods: The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results: Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0-14.5] for antegrade access and 1.8% (95% CI 1.1-2.9) for retrograde access (Pmore » = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only <0.5% of patients. Postdeployment bleeding occurred in 6.4%, and most these (51.5%) could be managed with light manual compression. During follow-up, other device-related complications were reported in 1.3%: seven false aneurysms, three hematoma >5.9 cm, and two vessel occlusions. Conclusion: The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters.« less

  19. CIRSE Vascular Closure Device Registry

    PubMed Central

    Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2010-01-01

    Purpose Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only <0.5% of patients. Postdeployment bleeding occurred in 6.4%, and most these (51.5%) could be managed with light manual compression. During follow-up, other device-related complications were reported in 1.3%: seven false aneurysms, three hematoma >5.9 cm, and two vessel occlusions. Conclusion The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters. PMID:20981425

  20. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  1. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  2. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  3. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  4. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  5. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions 'Catalyze' Broader Management?

    PubMed

    Oliver, Thomas A; Oleson, Kirsten L L; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village's fished area and lasted 2-7 months. Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure's reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management ("no ban", n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown ("ban", n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after "no ban" closures and modest increases after "ban" closures. Villages did not show a significant decline in income during closure events. Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers' time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing more comprehensive management.

  6. 40 CFR 267.142 - Cost estimate for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...

  7. 40 CFR 267.142 - Cost estimate for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...

  8. Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.

    PubMed

    Ergene Şentürk, Didar; Alp, Emre

    2016-11-01

    Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.

  9. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  10. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  11. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  12. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions ‘Catalyze’ Broader Management?

    PubMed Central

    Oliver, Thomas A.; Oleson, Kirsten L. L.; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Overview Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village’s fished area and lasted 2-7 months. Fishery Catches from Each Closed Site Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure’s reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management (“no ban”, n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown (“ban”, n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. Fishery Income in Implementing Villages In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after “no ban” closures and modest increases after “ban” closures. Villages did not show a significant decline in income during closure events. Net Economic Benefits from Each Closed Site Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers’ time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. Broader Co-Management We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing

  13. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  14. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  15. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  16. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  17. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  18. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and

  19. Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerry L. Nisson

    2012-10-01

    This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

  20. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less

  1. Closure Report for CAU No. 430: Buried Depleted Uraniuim Artillery Round No. 1, Tonopah Test Range, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1997-02-25

    1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less

  2. CLOSING IN ON CLOSURE PERSPECTIVES FROM HANFORD & FERNALD AN UPDATE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CONNELL, J.D.

    2004-12-22

    In World War II, the arms dramatically changed from machine guns and incendiary bombs to nuclear weapons. Hanford and Fernald, two government-run sites, were part of the infrastructure established for producing the fissile material for making these weapons, as well as building a nuclear arsenal to deter future aggression by other nations. This paper compares and contrasts, from a communications point of view, these two Department of Energy (DOE) closure sites, each with Fluor as a prime contractor. The major differences between the two sites--Hanford in Washington state and Fernald in Ohio--includes the following: size of the site and themore » workforce, timing of closure, definition of end state, DOE oversight, proximity to population centers, readiness of local population for closure, and dependence of the local economy on the site's budget. All of these elements affect how the sites' communication professionals provide information even though the objectives are the same: build public acceptance and support for DOE's mission to accelerate cleanup, interface with stakeholders to help ensure that issues are addressed and goals are met, help workers literally work themselves out of jobs--faster, and prepare the ''host'' communities to deal with the void left when the sites are closed and the government contractors are gone. The 12-months between January 04 and January 05 have seen dramatic transformations at both sites, as Fernald is now just about a year away from closure and FLuor's work at Hanford has made the transition from operations to deactivation and demolition. While Fernald continues to clean out silos of waste and ship it off site, Hanford is dealing with recent state legislation that has the potential to significantly impact the progress of cleanup. These changes have even further accentuated the differences in the content, distribution, and impact of communications.« less

  3. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  4. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  5. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the

  6. Corrective Action Decision Document/Closure Report for Corrective Action Unit 106: Area 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews and Dawn Peterson

    2011-09-01

    Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting

  7. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strachan, C.L.; Raabe, K.L.

    1997-12-31

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less

  8. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less

  9. Closure device for lead-acid batteries

    DOEpatents

    Ledjeff, Konstantin

    1983-01-01

    A closure device for lead-acid batteries includes a filter of granulated activated carbon treated to be hydrophobic combined with means for preventing explosion of emitted hydrogen and oxygen gas. The explosion prevention means includes a vertical open-end tube within the closure housing for maintaining a liquid level above side wall openings in an adjacent closed end tube. Gases vent from the battery through a nozzle directed inside the closed end tube against an impingement surface to remove acid droplets. The gases then flow through the side wall openings and the liquid level to quench any possible ignition prior to entering the activated carbon filter. A wick in the activated carbon filter conducts condensed liquid back to the closure housing to replenish the liquid level limited by the open-end tube.

  10. Closure Report for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-09-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern

  11. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.; Lantow, Tiffany A.

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less

  12. Improving the Safety of Moving Lane Closures

    DOT National Transportation Integrated Search

    2009-06-01

    Moving lane closures are an increasingly utilized and inherently hazardous traffic control procedure for highway : maintenance and operations activities. To improve the safety of moving lane closures for workers and motorists, : this research studied...

  13. Comparison of surgical techniques for stoma closure: A retrospective study of purse-string skin closure versus conventional skin closure following ileostomy and colostomy reversal

    PubMed Central

    WADA, YUMA; MIYOSHI, NORIKATSU; OHUE, MASAYUKI; NOURA, SHINGO; FUJINO, SHIKI; SUGIMURA, KEIJIROU; AKITA, HIROFUMI; MOTOORI, MASAAKI; GOTOH, KUNIHITO; TAKAHASHI, HIDENORI; KOBAYASHI, SHOGO; OHMORI, TAKESHI; FUJIWARA, YOSHIYUKI; YANO, MASAHIKO

    2015-01-01

    The aim of this study was to compare the incidence of postoperative complications, including superficial incisional surgical site infection (SSI) following purse-string skin closure (PS) and conventional skin closure with a drainage tube (CD) following stoma closure. A total of 55 consecutive patients who underwent loop colostomy and loop ileostomy closures in our hospital between October, 2011 and September, 2014 were retrospectively assessed. The patients were divided into two groups, namely the PS group (26 patients) and the CD group (29 patients). There were no significant differences in the characteristics of the patients between the two groups. The baseline and operative characteristics also did not differ significantly between the two groups. However the incidence of superficial incisional SSI was lower in the PS group compared to that in the CD group (0 vs. 13.8%, respectively; P=0.049). The overall incidence of complications did not differ significantly between the two groups (P=0.313). The duration of postoperative hospital stay in the PS group was shorter compared to that in the CD group. In conclusion, the results of this study suggest that PS may an effective technique to reduce the incidence of superficial incisional SSI. This technique appears to be superior to the conventional technique, allowing for better cosmesis. PMID:26137277

  14. A reliable and safe gastrotomy closure technique assessed in a porcine survival model pilot study: success of the Queen's closure.

    PubMed

    Hookey, L C; Bielawska, B; Samis, A; Jalink, D; Ellis, R; Khokhotva, V; Hurlbut, D; Mercer, D

    2009-06-01

    The evolution of NOTES to clinical implementation has been hampered by lack of a reliable, safe, and easy-to-implement technique for closure of the opening created in accessing the peritoneum. The Queen's closure uses a combination of endoscopic clips and loop devices to seal such defects in the stomach wall. This study aimed to assess the Queen's closure in a porcine survival model. Five 30-kg pigs underwent endoscopic transgastric surgery with exploration of the peritoneum. The endoscope was then withdrawn back into the stomach and the closure performed. The animals were recovered, monitored closely, and underwent endoscopy 1 week after surgery. They were then euthanized at 2 (n = 2) and 3 (n = 3) weeks after surgery with subsequent necropsy. The mean procedure time (from intubation of the esophagus to withdrawal of the endoscope) was 79 minutes (range 45-105 minutes) with a mean time of exploration of the peritoneum of 14 minutes (range 8-25 minutes). All animals recovered well with no apparent pain, distress, or signs of infection. Endoscopic examination 1 week after surgery revealed all the closures to be intact and only identifiable by a small ulcer. At necropsy, the gastrotomy site was identifiable only by minor serosal adhesions. Histological study demonstrated full-thickness closure with minimal inflammation. The Queen's closure is a reliable and safe technique that provides full-thickness gastrotomy closure without any observed complications. The technique has proven to be transferable knowledge that holds promise for clinical implementation.

  15. TANK FARM CLOSURE - A NEW TWIST ON REGULATORY STRATEGIES FOR CLOSURE OF WASTE TANK RESIDUALS FOLLOWING NUREG

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LEHMAN LL

    2008-01-23

    Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most challenging activities faced by the DOE. This is due in part to the complicated regulatory structures that have developed. These regulatory structures aremore » different at each of the DOE sites, making it difficult to apply lessons learned from one site to the next. During the past two years with the passage of the Section 3116 of the 'Ronald Reagan Defense Authorization Act of 2005' (NDAA) [2] some standardization has emerged for Savannah River Site and the Idaho National Laboratory tank residuals. Recently, with the issuance of 'NRC Staff Guidance for Activities Related to US. Department of Energy Waste Determinations' (NUREG-1854) [3] more explicit options may be considered for Hanford tank residuals than are presently available under DOE Orders. NUREG-1854, issued in August 2007, contains several key pieces of information that if utilized by the DOE in the tank closure process, could simplify waste classification and streamline the NRC review process by providing information to the NRC in their preferred format. Other provisions of this NUREG allow different methods to be applied in determining when waste retrieval is complete by incorporating actual project costs and health risks into the calculation of 'technically and economically practical'. Additionally, the NUREG requires a strong understanding of the uncertainties of the analyses, which given the desire of some NRC/DOE staff may increase the likelihood of using probabilistic approaches to uncertainty analysis. The

  16. Nevada National Security Site Industrial Sites Project Closeout - 12498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin; Krauss, Mark; Matthews, Pat

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the

  17. Taking Closure to the Next Level - 13030

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2013-07-01

    The River Corridor Closure Project (RCCP) is the Hanford Site's first closure project and when it is complete, in 2015, it will have cleaned up 220 mi{sup 2} of contaminated land adjacent to the Columbia River. Washington Closure Hanford (WCH) was selected by the DOE to manage the removal and cleanup of Hanford's nuclear legacy along the River Corridor. Work began in 2005 and is now more than 85% complete with more than 2 years left in the contract. A Closure Team was commissioned in December 2009 and has since issued a closure strategy and a disciplined three-phase approach tomore » transition land parcels to DOE, Richland Operations Office (DOE-RL) as cleanup is completed. This process supports DOE-RL objectives for progressive footprint reduction based on the division of the River Corridor into geographical land parcels. It also allows for incremental area-by-area transition and turnover to the Long-Term Stewardship program. Several important milestones stand between now and the successful end of the RCCP. They include overall funding impacts, working with DOE-RL on new scope additions, meeting regulatory milestones, and maintaining a strong safety performance. (authors)« less

  18. Transapical access closure: the TA PLUG device†

    PubMed Central

    Brinks, Henriette; Nietlispach, Fabian; Göber, Volkhard; Englberger, Lars; Wenaweser, Peter; Meier, Bernhard; Carrel, Thierry; Huber, Christoph

    2013-01-01

    OBJECTIVES Percutaneous closure of the transapical (TA) access site for large-calibre devices is an unsolved issue. We report the first experimental data on the TA PLUG device for true-percutaneous closure following large apical access for transcatheter aortic valve implantation. METHODS The TA PLUG, a self-sealing full-core closure device, was implanted in an acute animal study in six pigs (60.2 ± 0.7 kg). All the pigs received 100 IU/kg of heparin. The targeted activated clotting time was left to normalize spontaneously. After accessing the left ventricular apex with a 39 French introducer, the closure plug device was delivered with a 33 French over-the-wire system under fluoroscopic guidance into the apex. Time to full haemostasis as well as rate of bleeding was recorded. Self-anchoring properties were assessed by haemodynamic push stress under adrenalin challenge. An additional feasibility study was conducted in four pigs (58.4 ± 1.1 kg) with full surgical exposure of the apex, and assessed device anchoring by pull-force measurements with 0.5 Newton (N) increments. All the animals were electively sacrified. Post-mortem analysis of the heart was performed and the renal embolic index assessed. RESULTS Of six apical closure devices, five were correctly inserted and fully deployed at the first attempt. One became blocked in the delivery system and was placed successfully at the second attempt. In all the animals, complete haemostasis was immediate and no leak was recorded during the 5-h observation period. Neither leak nor any device dislodgement was observed under haemodynamic push stress with repeated left ventricular peak pressure of up to 220 mmHg. In the feasibility study assessing pull-stressing, device migration occurred at a force of 3.3 ± 0.5 N corresponding to 247.5 mmHg. Post-mortem analyses confirmed full expansion of all devices at the intended target. No macroscopic damage was identified at the surrounding myocardium. The renal embolic index was

  19. 40 CFR 265.142 - Cost estimate for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must equal the cost of final closure at the point in the facility's active life when the extent and... at all times over the life of the facility. (3) The closure cost estimate may not incorporate any... facility at the time of partial or final closure. (4) The owner or operator may not incorporate a zero cost...

  20. 40 CFR 265.142 - Cost estimate for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must equal the cost of final closure at the point in the facility's active life when the extent and... at all times over the life of the facility. (3) The closure cost estimate may not incorporate any... facility at the time of partial or final closure. (4) The owner or operator may not incorporate a zero cost...

  1. 40 CFR 265.143 - Financial assurance for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., except as provided in § 265.143(f), divided by the number of years in the pay-in period. (ii) Subsequent... bills for partial or final closure activities, the Regional Administrator will instruct the trustee to... facility over its remaining operating life. Within 60 days after receiving bills for closure activities...

  2. 40 CFR 264.143 - Financial assurance for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in § 264.143(g), divided by the number of years in the pay-in period. Subsequent payments must be... for partial or final closure activities, the Regional Administrator will instruct the trustee to make... operating life. Within 60 days after receiving bills for closure activities, the Regional Administrator will...

  3. Estimation of crown closure from AVIRIS data using regression analysis

    NASA Technical Reports Server (NTRS)

    Staenz, K.; Williams, D. J.; Truchon, M.; Fritz, R.

    1993-01-01

    Crown closure is one of the input parameters used for forest growth and yield modelling. Preliminary work by Staenz et al. indicates that imaging spectrometer data acquired with sensors such as the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) have some potential for estimating crown closure on a stand level. The objectives of this paper are: (1) to establish a relationship between AVIRIS data and the crown closure derived from aerial photography of a forested test site within the Interior Douglas Fir biogeoclimatic zone in British Columbia, Canada; (2) to investigate the impact of atmospheric effects and the forest background on the correlation between AVIRIS data and crown closure estimates; and (3) to improve this relationship using multiple regression analysis.

  4. Active-Site Plasticity Is Essential to Carbapenem Hydrolysis by OXA-58 Class D β-Lactamase of Acinetobacter baumannii.

    PubMed

    Pratap, Shivendra; Katiki, Madhusudhanarao; Gill, Preet; Kumar, Pravindra; Golemi-Kotra, Dasantila

    2016-01-01

    Carbapenem-hydrolyzing class D β-lactamases (CHDLs) are a subgroup of class D β-lactamases, which are enzymes that hydrolyze β-lactams. They have attracted interest due to the emergence of multidrug-resistant Acinetobacter baumannii, which is not responsive to treatment with carbapenems, the usual antibiotics of choice for this bacterium. Unlike other class D β-lactamases, these enzymes efficiently hydrolyze carbapenem antibiotics. To explore the structural requirements for the catalysis of carbapenems by these enzymes, we determined the crystal structure of the OXA-58 CHDL of A. baumannii following acylation of its active-site serine by a 6α-hydroxymethyl penicillin derivative that is a structural mimetic for a carbapenem. In addition, several point mutation variants of the active site of OXA-58, as identified by the crystal structure analysis, were characterized kinetically. These combined studies confirm the mechanistic relevance of a hydrophobic bridge formed over the active site. This structural feature is suggested to stabilize the hydrolysis-productive acyl-enzyme species formed from the carbapenem substrates of this enzyme. Furthermore, our structural studies provide strong evidence that the hydroxyethyl group of carbapenems samples different orientations in the active sites of CHDLs, and the optimum orientation for catalysis depends on the topology of the active site allowing proper closure of the active site. We propose that CHDLs use the plasticity of the active site to drive the mechanism of carbapenem hydrolysis toward efficiency. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  5. On Subsurface Fracture Opening and Closure

    NASA Astrophysics Data System (ADS)

    Wang, Y.

    2016-12-01

    Mechanistic understanding of fracture opening and closure in geologic media is of significant importance to nature resource extraction and waste management, such as geothermal energy extraction, oil/gas production, radioactive waste disposal, and carbon sequestration and storage). A dynamic model for subsurface fracture opening and closure has been formulated. The model explicitly accounts for the stress concentration around individual aperture channels and the stress-activated mineral dissolution and precipitation. A preliminary model analysis has demonstrated the importance of the stress-activated dissolution mechanism in the evolution of fracture aperture in a stressed geologic medium. The model provides a reasonable explanation for some key features of fracture opening and closure observed in laboratory experiments, including a spontaneous switch from a net permeability reduction to a net permeability increase with no changes in a limestone fracture experiment.

  6. 40 CFR 264.258 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Piles § 264.258 Closure and post-closure care. (a) At closure, the owner or operator must remove... that apply to landfills (§ 264.310). (c)(1) The owner or operator of a waste pile that does not comply...(c) or § 264.251(b), must: (i) Include in the closure plan for the pile under § 264.112 both a plan...

  7. Composite three-layer closure of oral antral communication with 10 months follow-up-a case study.

    PubMed

    Weinstock, Robert J; Nikoyan, Levon; Dym, Harry

    2014-02-01

    We propose a 3-layer composite closure technique for an oral antral communication (OAC) while avoiding secondary donor site morbidity. A patient had developed a 1-cm OAC after extraction of right maxillary first molar. The patient subsequently developed acute maxillary sinusitis. The patient was taken to the operating room, and a Caldwell-Luc procedure was performed. The bony window from the Caldwell-Luc was "press fit" over the bony OAC defect. Soft tissue closure was then achieved with a buccal fat pad flap and a buccal mucosal advancement flap. The patient was examined on postoperative day 5 and 1, 2, 3, 6, and 10 months postoperatively. The acute sinusitis had resolved. The soft tissue closure was successful. The bone graft remained intact, prevented sinus pneumatization, and restored continuity to the floor of the maxillary sinus. The presented technique for 3-layer closure of OACs allows for the stability of a double-layer closure of OAC with the added benefit of bone grafting from single operative site, achieving stable oral antral closure, bone grafting, and the avoidance of secondary donor site morbidity. Copyright © 2014 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  8. Significant skin-tightening by closure of fractional ablative laser holes.

    PubMed

    Russe, Elisabeth; Purschke, Martin; Limpiangkanan, Wikunda; Farinelli, William A; Wang, Ying; Doukas, Apostolos G; Sakamoto, Fernanda H; Wechselberger, Gottfried; Anderson, Richard Rox

    2018-01-01

    Ablative fractional laser treatment uses thousands of very small laser beam wounds to damage a fraction of the skin, which stimulates tissue remodeling. Each open micro-wound heals without scarring, but the amount of skin tightening achieved is limited. This animal study was performed to test the hypothesis that immediate temporary closure of fractional laser wounds could increase skin tightening after fractional ablative laser treatment. Four adult swine were used for the study; 98 square test sites (3 × 3 cm) were tattooed on the abdomen and flanks of each pig. An ablative fractional Erbium:YAG laser (Sciton Profile, Sciton Inc, Palo Alto, CA) was used to treat the test areas. A laser micro-spot fluence of 375 J/cm 2 was delivered in 150-250 microseconds pulses, resulting in an array of ablation channels extending 1.5 mm deep into the skin, with a spot size of 250 µm, with 10% treatment density. Immediately following laser exposure the resulting holes were closed using a stretched elastic adhesive dressing, which, when applied, recoiled and compressed the diameter of the ablation holes. The compressive dressings were removed after 7 days. This procedure was compared to removing the same amount of skin (10%) mechanically by specially designed 19 gauge coring needles, as well as to the same laser and coring methods without compression closure. Area and shape of test sites were measured by digital photography before and 28 days after treatment. Data analysis included compensation for animal growth, as measured by increase in the area of the untreated control sites. All treated and control sites healed within a week, without scarring evident at 28 days. Laser treatment combined with compressive wound closure caused significant shrinkage at 28 days compared with untreated control sites. The treated skin area was reduced by 11.5% (P = 0.0001). Needle coring with wound closure produced similar, significant shrinkage (8%, P < 0.0021), whereas laser

  9. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- & H-Areas at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1996-07-31

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria

  10. Stent-Grafts in the Management of Hemorrhagic Complications Related to Hemostatic Closure Devices: Report of Two Cases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giansante Abud, Daniel; Mounayer, Charbel; Saint-Maurice, Jean Pierre

    We report 2 cases of hemorrhagic complications related to use of the Angio-Seal hemostatic closure device that were successfully managed with stent-grafts. Two patients with subarachnoid hemorrhage were referred to our departments for endovascular treatment of ruptured intracranial aneurysms. The treatment was performed through a femoral access; the sheaths were removed immediately after the procedures, and the punctures sites closed by Angio-Seals. Both patients presented clinical signs of hypovolemic shock after treatment. The diagnosis of active bleeding through the puncture site was made by emergency digital subtraction angiography. The lesions were managed with stent-grafts. The use of stent-grafts proved tomore » be efficient in the management of these life-threatening hemorrhagic complications following the use of the Angio-Seal hemostatic closure device.« less

  11. A shape memory polymer concrete crack closure system activated by electrical current

    NASA Astrophysics Data System (ADS)

    Teall, Oliver; Pilegis, Martins; Davies, Robert; Sweeney, John; Jefferson, Tony; Lark, Robert; Gardner, Diane

    2018-07-01

    The presence of cracks has a negative impact on the durability of concrete by providing paths for corrosive materials to the embedded steel reinforcement. Cracks in concrete can be closed using shape memory polymers (SMP) which produce a compressive stress across the crack faces. This stress has been previously found to enhance the load recovery associated with autogenous self-healing. This paper details the experiments undertaken to incorporate SMP tendons containing polyethylene terephthalate (PET) filaments into reinforced and unreinforced 500 × 100 × 100 mm structural concrete beam samples. These tendons are activated via an electrical supply using a nickel-chrome resistance wire heating system. The set-up, methodology and results of restrained shrinkage stress and crack closure experiments are explained. Crack closure of up to 85% in unreinforced beams and 26%–39% in reinforced beams is measured using crack-mouth opening displacement, microscope and digital image correlation equipment. Conclusions are made as to the effectiveness of the system and its potential for application within industry.

  12. Stapler Esophageal Closure During Total Laryngectomy.

    PubMed

    Ismi, Onur; Unal, Murat; Vayisoglu, Yusuf; Yesilova, Mesut; Helvaci, Ilter; Gorur, Kemal; Ozcan, Cengiz

    2017-01-01

    Mechanical esophageal closure with stapler during total laryngectomy has been used by various authors to decrease the surgical time and pharyngocutaneous fistula (PCF) rates. In a few of the studies, surgical site infection (SSI) rates are mentioned and none of the studies emphasize the effect of decreased surgical time on postoperative cardiovascular and cerebrovascular complications. In this study, the authors compared the PCF rates, SSI rates, operation times between 30 mechanical stapler and 40 manual esophageal closure during total laryngectomy for laryngeal cancer patients. National Nasocomial Infections Surveillance system (NNISS) scores were recorded and compared between groups. Total laryngectomy and total operation times were lower in the stapler group patients (P < 0.001 for total laryngectomy time, P = 0.024 for total operation time). There were lower rates of pharyngocutaneous fistula (P = 0.032), surgical site infection (P = 0.019), and NNISS scores (P = 0.009) in the stapler group. There was no statistically significant difference between groups regarding postoperative systemic complications (P = 0.451). In conclusion, stapler esophageal closure decreases operation time, PCF, SSI rates, and NNISS scores but not the systemic complication rates. Comorbid illnesses and prolonged surgical time are risk factors for postoperative systemic complications in total laryngectomy patients, but patients with additional illnesses must not encourage the surgeon to use stapler for decreasing postoperative systemic complications.

  13. 50 CFR 600.511 - Fishery closure procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Fishery closure procedures. 600.511 Section 600.511 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Fishery closure procedures. (a) Activity Codes 1 and 2 for a fishery are automatically canceled in the...

  14. Constitutive activation of a plasma membrane H(+)-ATPase prevents abscisic acid-mediated stomatal closure.

    PubMed

    Merlot, Sylvain; Leonhardt, Nathalie; Fenzi, Francesca; Valon, Christiane; Costa, Miguel; Piette, Laurie; Vavasseur, Alain; Genty, Bernard; Boivin, Karine; Müller, Axel; Giraudat, Jérôme; Leung, Jeffrey

    2007-07-11

    Light activates proton (H(+))-ATPases in guard cells, to drive hyperpolarization of the plasma membrane to initiate stomatal opening, allowing diffusion of ambient CO(2) to photosynthetic tissues. Light to darkness transition, high CO(2) levels and the stress hormone abscisic acid (ABA) promote stomatal closing. The overall H(+)-ATPase activity is diminished by ABA treatments, but the significance of this phenomenon in relationship to stomatal closure is still debated. We report two dominant mutations in the OPEN STOMATA2 (OST2) locus of Arabidopsis that completely abolish stomatal response to ABA, but importantly, to a much lesser extent the responses to CO(2) and darkness. The OST2 gene encodes the major plasma membrane H(+)-ATPase AHA1, and both mutations cause constitutive activity of this pump, leading to necrotic lesions. H(+)-ATPases have been traditionally assumed to be general endpoints of all signaling pathways affecting membrane polarization and transport. Our results provide evidence that AHA1 is a distinct component of an ABA-directed signaling pathway, and that dynamic downregulation of this pump during drought is an essential step in membrane depolarization to initiate stomatal closure.

  15. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  16. Patient Satisfaction After Femoral Arterial Access Site Closure Using the ExoSeal{sup ®} Vascular Closure Device Compared to Manual Compression: A Prospective Intra-individual Comparative Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pieper, Claus Christian, E-mail: claus.christian.pieper@ukb.uni-bonn.de; Thomas, Daniel, E-mail: daniel.thomas@ukb.uni-bonn.de; Nadal, Jennifer, E-mail: jennifer.nadal@ukb.uni-bonn.de

    PurposeTo intra-individually compare discomfort levels and patient satisfaction after arterial access closure using the ExoSeal{sup ®} vascular closure device (VCD) and manual compression (MC) in a prospective study design.MethodsPatients undergoing two planned interventions from 07/2013 to 09/2014 could participate in the study. Access closure was performed with an ExoSeal{sup ®}-VCD in one and MC in the other intervention. Patients were clinically and sonographically examined and were given questionnaires 1 day after intervention [groin- and back-pain during bedrest (100-point visual analog scale; 0: no pain); comfortability of bedrest (10-point Likert scale, 1: comfortable), satisfaction with closure (10-point Likert scale, 1: very satisfied)].more » Results were analyzed in a cross-over design.Results48 patients (29 male, median age 62.5 (32–88) years) were included. An ExoSeal{sup ®}-VCD was used first in 25 cases. As four of these subsequently refused MC as second intervention, data from 44 patients could be analyzed. All closures were technically successful (successful device deployment) without major complications. Groin- and back-pain after VCD-use/MC was 0 (0–15) vs. 10 (0–80) and 0 (0–75) vs. 25 (0–90), respectively (p < 0.0001). Bedrest after VCD-use was more comfortable than after MC [1 (range 1–7) vs. 6 (2–10); p < 0.0001]. Satisfaction with the closure procedure and with the intervention in general was higher after VCD-use compared to MC [1 (1–3) vs. 5 (2–10) and 1 (1–2) vs. 2 (1–4), respectively; p < 0.0001].ConclusionIntra-individual comparison showed pain levels and discomfort to be significantly lower after ExoSeal{sup ®} use compared to MC. VCD closure was associated with higher satisfaction both with the closure itself and with the intervention in general.« less

  17. Effect of wastewater treatment facility closure on endocrine disrupting chemicals in a Coastal Plain stream

    USGS Publications Warehouse

    Bradley, Paul M.; Journey, Celeste A.; Clark, Jimmy M.

    2016-01-01

    Wastewater treatment facility (WWTF) closures are rare environmental remediation events; offering unique insight into contaminant persistence, long-term wastewater impacts, and ecosystem recovery processes. The U.S. Geological Survey assessed the fate of select endocrine disrupting chemicals (EDC) in surface water and streambed sediment one year before and one year after closure of a long-term WWTF located within the Spirit Creek watershed at Fort Gordon, Georgia. Sample sites included a WWTF-effluent control located upstream from the outfall, three downstream effluent-impacted sites located between the outfall and Spirit Lake, and one downstream from the lake's outfall. Prior to closure, the 2.2-km stream segment downstream from the WWTF outfall was characterized by EDC concentrations significantly higher (α = 0.05) than at the control site; indicating substantial downstream transport and limited in-stream attenuation of EDC, including pharmaceuticals, estrogens, alkylphenol ethoxylate (APE) metabolites, and organophosphate flame retardants (OPFR). Wastewater-derived pharmaceutical, APE metabolites, and OPFR compounds were also detected in the outflow of Spirit Lake, indicating the potential for EDC transport to aquatic ecosystems downstream of Fort Gordon under effluent discharge conditions. After the WWTF closure, no significant differences in concentrations or numbers of detected EDC compounds were observed between control and downstream locations. The results indicated EDC pseudo-persistence under preclosure, continuous supply conditions, with rapid attenuation following WWTF closure. Low concentrations of EDC at the control site throughout the study and comparable concentrations in downstream locations after WWTF closure indicated additional, continuing, upstream contaminant sources within the Spirit Creek watershed. 

  18. Infering and Calibrating Triadic Closure in a Dynamic Network

    NASA Astrophysics Data System (ADS)

    Mantzaris, Alexander V.; Higham, Desmond J.

    In the social sciences, the hypothesis of triadic closure contends that new links in a social contact network arise preferentially between those who currently share neighbours. Here, in a proof-of-principle study, we show how to calibrate a recently proposed evolving network model to time-dependent connectivity data. The probabilistic edge birth rate in the model contains a triadic closure term, so we are also able to assess statistically the evidence for this effect. The approach is shown to work on data generated synthetically from the model. We then apply this methodology to some real, large-scale data that records the build up of connections in a business-related social networking site, and find evidence for triadic closure.

  19. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  20. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  1. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  2. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  3. Chemical composition and mass closure of ambient coarse particles at traffic and urban-background sites in Thessaloniki, Greece.

    PubMed

    Grigoratos, Theodoros; Samara, Constantini; Voutsa, Dimitra; Manoli, Evangelia; Kouras, Athanasios

    2014-06-01

    Concentrations and chemical composition of the coarse particle fraction (PMc) were investigated at two urban sites in the city of Thessaloniki, Greece, through concurrent sampling of PM10 and PM2.5 during the warm and the cold months of the year. PMc levels at the urban-traffic site (UT) were among the highest found in literature worldwide exhibiting higher values in the cold period. PMc levels at the urban-background site (UB) were significantly lower exhibiting a reverse seasonal trend. Concentration levels of minerals and most trace metals were also higher at the UT site suggesting a stronger impact from traffic-related sources (road dust resuspension, brake and tire abrasion, road wear). According to the chemical mass closure obtained, minerals (oxides of Si, Al, Ca, Mg, Fe, Ti, and K) dominated the PMc profile, regardless of the site and the period, with organic matter and secondary inorganic aerosols (mainly nitrate) also contributing considerably to the PMc mass, particularly in the warm period. The influence of wind speed to dilution and/or resuspension of coarse particles was investigated. The source of origin of coarse particles was also investigated using surface wind data and atmospheric back-trajectory modeling. Finally, the contribution of resuspension to PMc levels was estimated for air quality management perspectives.

  4. Industrial Sites - An Approach to Closure

    ScienceCinema

    None

    2018-01-16

    The Environmental Management (EM) Program at the Nevada Site Office was created by the U.S. Department of Energy (DOE) to address the environmental legacy of contamination resulting from more than 50 years of nuclear weapons research, production and testing. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NSO) is responsible for remediating portions of the Nevada National Security Site (formerly the Nevada Test Site) and the Tonopah Test Range, which is within the Nevada Test and Training Range.

  5. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... post-closure care. (a) At closure of a magazine or unit which stored hazardous waste under this subpart... estimates for closure, and financial responsibility for magazines or units must meet all of the requirements... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  6. Skin closure with dye-enhanced laser welding and fibrinogen.

    PubMed

    Wider, T M; Libutti, S K; Greenwald, D P; Oz, M C; Yager, J S; Treat, M R; Hugo, N E

    1991-12-01

    The topical application of wavelength-specific dye and fibrinogen has been used to enhance laser closure of vascular anastomoses. We compared the closure of skin incisions by two different dye-enhanced, fibrinogen-based laser welding systems [argon laser (power density 4.78 W/cm2) with fluorescein isothiocyanate dye (n = 32) and diode laser (power density 9.55 W/cm2) with indocyanine green dye (n = 32)] with closure by interrupted 5-0 nylon suture (n = 64) and examined tensile strength, hydroxyproline production, histology, and cosmesis. Two 3-cm full-thickness incisions were made on the shaved backs of 64 rats. One incision was closed with suture, whereas the other, after treatment with the appropriate dye, was welded with either argon- or diode-lasered fibrinogen. At postoperative days 5, 10, 15, and 28, the closure sites were harvested and sectioned for analysis. Initially, wounds closed with argon-lasered fibrinogen showed less inflammatory response, greater collagen production (34.61 +/- 0.74 mg/gm), and greater mean peak stress at rupture (64.85 lbs/in2) than those closed with suture (16.42 +/- 3.20 mg/gm, 26.68 lbs/in2) (p less than 0.05). By 15 days, both argon and diode laser closures are superior in strength and collagen production to suture closure (p less than 0.05). At 28 days, diode laser closures (1315.60 lbs/in2) are stronger than suture closures (998.09 lbs/in2), whereas both are stronger than argon laser closures (813.16 lbs/in2) (p less than 0.05). Cosmetically, argon-welded wounds consistently appeared finer and lacked cross-hatched suture scars.(ABSTRACT TRUNCATED AT 250 WORDS)

  7. Site Rehabilitation Completion Report with No Further Action Proposal for the Northeast Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel, Joe; Tabor, Charles; Survochak, Scott

    2013-05-01

    The purpose of this Site Rehabilitation Completion Report is to present the post-active-remediation monitoring results for the Northeast Site and to propose No Further Action with Controls. This document includes information required by Chapter 62-780.750(4)(d), 62-780.750(6), and 62-780.600(8)(a)27 Florida Administrative Code (F.A.C.). The Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site (DOE 2009a) describes the approach for post-active-remediation monitoring. The Young - Rainey Science, Technology, and Research Center (STAR Center) is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 99-acre STAR Center is located in Largo, Florida. The Northeast Site is locatedmore » in the northeast corner of the STAR Center. The Northeast Site meets all the requirements for an RMO II closure—No Further Action with Controls. DOE is nearing completion of a restrictive covenant for the Northeast Site. DOE has completed post-active-remediation monitoring at the Northeast Site as of September 2012. No additional monitoring will be conducted.« less

  8. Interaction of mining activities and aquatic environment: A review from Greek mine sites.

    NASA Astrophysics Data System (ADS)

    Vasileiou, Eleni; Kallioras, Andreas

    2016-04-01

    In Greece a significant amount of mineral and ore deposits have been recorded accompanied by large industrial interest and a long mining history. Today many active and/or abandoned mine sites are scattered within the country; while mining activities take place in different sites for exploiting various deposits (clay, limestone, slate, gypsum, kaolin, mixed sulphide ores (lead, zinc, olivine, pozzolan, quartz lignite, nickel, magnesite, aluminum, bauxite, gold, marbles etc). The most prominent recent ones are: (i) the lignite exploitation that is extended in the area of Ptolemais (Western Macedonia) and Megalopolis (Central Peloponnese); and (ii) the major bauxite deposits located in central Greece within the Parnassos-Ghiona geotectonic zone and on Euboea Island. In the latter area, significant ores of magnesite were exploited and mixed sulphide ores. Centuries of intensive mining exploitation and metallurgical treatment of lead-silver deposits in Greece, have also resulted in significant abandoned sites, such as the one in Lavrion. Mining activities in Lavrio, were initiated in ancient times and continued until the 1980s, resulting in the production of significant waste stockpiles deposited in the area, crucial for the local water resources. Ιn many mining sites, environmental pressures are also recorded after the mine closure to the aquatic environment, as the surface waters flow through waste dump areas and contaminated soils. This paper aims to the geospatial visualization of the mining activities in Greece, in connection to their negative (surface- and/or ground-water pollution; overpumping due to extensive dewatering practices) or positive (enhanced groundwater recharge; pit lakes, improvement of water budget in the catchment scale) impacts on local water resources.

  9. Factors associated with increasing nursing home closures.

    PubMed

    Castle, Nicholas G; Engberg, John; Lave, Judith; Fisher, Andrew

    2009-06-01

    We determine the rate of nursing home closures for 7 years (1999-2005) and examine internal (e.g., quality), organizational (e.g., chain membership), and external (e.g., competition) factors associated with these closures. The names of the closed facilities and dates of closure from state regulators in all 50 states were obtained. This information was linked to the Online Survey, Certification, and Reporting data, which contains information on internal, organizational, and market factors for almost all nursing homes in the United States. One thousand seven hundred and eighty-nine facilities closed over this time period (1999-2005). The average annual rate of closure was about 2 percent of facilities, but the rate of closure was found to be increasing. Nursing homes with higher rates of deficiency citations, hospital-based facilities, chain members, small bed size, and facilities located in markets with high levels of competition were more likely to close. High Medicaid occupancy rates were associated with a high likelihood of closure, especially for facilities with low Medicaid reimbursement rates. As states actively debate about how to redistribute long-term care services/dollars, our findings show that they should be cognizant of the potential these decisions have for facilitating nursing home closures.

  10. 36 CFR 13.1328 - EGDA closures and restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...

  11. 36 CFR 13.1328 - EGDA closures and restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...

  12. 36 CFR 13.1328 - EGDA closures and restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...

  13. 36 CFR 13.1328 - EGDA closures and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...

  14. The Impact of Public Hospital Closure on Medical and Residency Education: Implications and Recommendations

    PubMed Central

    Walker, Kara Odom; Calmes, Daphne; Hanna, Nancy; Baker, Richard

    2010-01-01

    Background Challenges around safety-net hospital closure have impacted medical student and resident exposure to urban public healthcare sites that may influence their future practice choices. Objective To assess the impact of the closure of a public safety-net teaching hospital for the clinical medical education of Charles Drew University medical students and residents. Method Retrospective cohort study of medical students’ and residents’ and clinical placement into safety-net experiences after the closure of the primary teaching hospital. Results The hospital closure impacted both medical student and residency training experiences. Only 71% (17/24) of medical student rotations and 13% (23/180) of residents were maintained at public safety-net clinical sittings. The closure of the public safety-net hospital resulted in the loss of 36% of residency training spots sponsored by historically black medical schools in the United States and an even larger negative impact on the number of physicians training in underserved urban areas of Los Angeles County. Conclusion While the medical educational program changes undertaken in the wake of hospital closure have negatively affected the immediate clinical educational experiences of medical students and residents, it remains to be seen whether the training site location changes will alter their long-term preferences in specialty choice and practice location. PMID:19110905

  15. The impact of public hospital closure on medical and residency education: implications and recommendations.

    PubMed

    Walker, Kara Odom; Calmes, Daphne; Hanna, Nancy; Baker, Richard

    2008-12-01

    Challenges around safety-net hospital closure have impacted medical student and resident exposure to urban public healthcare sites that may influence their future practice choices. To assess the impact of the closure of a public safety-net teaching hospital for the clinical medical education of Charles Drew University medical students and residents. Retrospective cohort study of medical students' and residents' and clinical placement into safety-net experiences after the closure of the primary teaching hospital. The hospital closure impacted both medical student and residency training experiences. Only 71% (17/24) of medical student rotations and 13% (23/180) of residents were maintained at public safety-net clinical sittings. The closure of the public safety-net hospital resulted in the loss of 36% of residency training spots sponsored by historically black medical schools in the United States and an even larger negative impact on the number of physicians training in underserved urban areas of Los Angeles County. While the medical educational program changes undertaken in the wake of hospital closure have negatively affected the immediate clinical educational experiences of medical students and residents, it remains to be seen whether the training site location changes will alter their long-term preferences in specialty choice and practice location.

  16. Addendum to the Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site

  17. Closure of the Radial Forearm Free Flap Donor Site Using the Combined Local Triangular Full-Thickness Skin Graft.

    PubMed

    Moreno-Sánchez, Manuel; González-García, Raúl; Ruiz-Laza, Luis; Manzano Solo de Zaldívar, Damián; Moreno-García, Carlos; Monje, Florencio

    2016-01-01

    Traditional donor-site closure has been associated with serious esthetic and functional morbidity. The purpose of this study was to assess morbidity in esthetics and function and measure the postoperative complications of the radial forearm free flap (RFFF) donor site after using combined local triangular full-thickness skin grafting. This prospective study of patients who underwent reconstruction of head and neck defects using an RFFF was conducted from July 2008 through December 2014. The donor site was repaired with a combined local triangular full-thickness skin graft. Quality of the scar, color match, tendon exposure, presence of necrosis, dehiscence of the suture, and presence of dysesthesia were recorded and analyzed using SPSS 21.0 software. One hundred consecutive patients (71 male and 29 female) underwent RFFF harvesting. RFFF donor-site defects ranged from 15 to 70 cm2; partial skin graft loss occurred in 7% of patients. Five patients (5%) had small dehiscences of the forearm skin graft, and 2 cases (2%) presented tendon exposure. In all cases, these sites healed secondarily by conservative management, with no final impairment of function. Esthetic results were considered excellent in 87%, good in 11%, and suboptimal in 2% of the cases. The combined local triangular full-thickness skin graft is a reliable method for closing RFFF donor-site defects because it obviates a second surgical site, it provides excellent color match and pliability, and it can be used for covering large defects of the donor site. Copyright © 2016 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  18. Closure of colostomy.

    PubMed Central

    Beck, P H; Conklin, H B

    1975-01-01

    We analyzed the records of 77 cases of loop colostomy closure in Vietnam War Casualties. All records were complete from the date of injury to discharge following colostomy closure. Simple of the loop colostomy was performed in 44 patients and resection of the stoma and reanastomosis of bowel segments was performed in 33 patients. Average operating time for simple closure of the loop was 70 minutes compared to 115 minutes for resection and anastomosis. Nasogastric suction was used less frequently and for a shorter time with simple loop closure. The total postoperative complication rate was 9% with simple loop closure as compared to 24% for resection and anastomosis. Simple closure of the loop described in this report is technically easier and as safe as resection of the stoma and reanastomosis. Images Fig. 1. PMID:1094967

  19. Heterochrony and patterns of cranial suture closure in hystricognath rodents

    PubMed Central

    Wilson, Laura A B; Sánchez-Villagra, Marcelo R

    2009-01-01

    Sutures, joints that allow one bone to articulate with another through intervening fibrous connective tissue, serve as major sites of bone expansion during postnatal craniofacial growth in the vertebrate skull and represent an aspect of cranial ontogeny which may exhibit functional and phylogenetic correlates. Suture evolution among hystricognath rodents, an ecologically diverse group represented here by 26 species, is examined using sequence heterochrony methods, i.e. event pairing and parsimov. Although minor nuances in suture closure sequence exist between species, the overall sequence was found to be conserved both across the hystricognath group and, to an increasing degree, within selected clades. At species level, suture closure pattern exhibited a significant positive correlation with patterns previously reported for hominoids. Patterns for most clades revealed the first sutures to close are those contacting the exoccipital, interparietal, and palatine bones. Heterochronic shifts were found along 19 of 35 branches within the hystricognath phylogeny. The number of shifts per node ranged from one to seven events and, overall, involved 21 of 34 suture sites. The topology generated by parsimony analyses of the event pair matrix yielded only one grouping that was congruent with the evolutionary relationships, compiled from morphological and molecular studies, taken as framework. Sutures contacting the exoccipital displayed the highest levels of most complete closure across all species. Level of suture closure is negatively correlated with cranial length (P < 0.05). Differing life history and locomotory strategies are coupled in part with differing suture closure patterns among several species. PMID:19245501

  20. Randomized clinical trial of intestinal ostomy takedown comparing pursestring wound closure vs conventional closure to eliminate the risk of wound infection.

    PubMed

    Camacho-Mauries, Daniel; Rodriguez-Díaz, José Luis; Salgado-Nesme, Noel; González, Quintín H; Vergara-Fernández, Omar

    2013-02-01

    The use of temporary stomas has been demonstrated to reduce septic complications, especially in high-risk anastomosis; therefore, it is necessary to reduce the number of complications secondary to ostomy takedowns, namely wound infection, anastomotic leaks, and intestinal obstruction. To compare the rates of superficial wound infection and patient satisfaction after pursestring closure of ostomy wound vs conventional linear closure. Patients undergoing colostomy or ileostomy closure between January 2010 and February 2011 were randomly assigned to linear closure (n = 30) or pursestring closure (n = 31) of their ostomy wound. Wound infection within 30 days of surgery was defined as the presence of purulent discharge, pain, erythema, warmth, or positive culture for bacteria. Patient satisfaction, healing time, difficulty managing the wound, and limitation of activities were analyzed with the Likert questionnaire. The infection rate for the control group was 36.6% (n = 11) vs 0% in the pursestring closure group (p < 0.0001). Healing time was 5.9 weeks in the linear closure group and 3.8 weeks in the pursestring group (p = 0.0002). Seventy percent of the patients with pursestring closure were very satisfied in comparison with 20% in the other group (p = 0.0001). This study was limited by the heterogeneity in the type of stoma in both groups. The pursestring method resulted in the absence of infection after ostomy wound closure (shorter healing time and improved patient satisfaction).

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-08-01

    Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were

  2. Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are

  3. Regional neural tube closure defined by the Grainy head-like transcription factors.

    PubMed

    Rifat, Yeliz; Parekh, Vishwas; Wilanowski, Tomasz; Hislop, Nikki R; Auden, Alana; Ting, Stephen B; Cunningham, John M; Jane, Stephen M

    2010-09-15

    Primary neurulation in mammals has been defined by distinct anatomical closure sites, at the hindbrain/cervical spine (closure 1), forebrain/midbrain boundary (closure 2), and rostral end of the forebrain (closure 3). Zones of neurulation have also been characterized by morphologic differences in neural fold elevation, with non-neural ectoderm-induced formation of paired dorso-lateral hinge points (DLHP) essential for neural tube closure in the cranial and lower spinal cord regions, and notochord-induced bending at the median hinge point (MHP) sufficient for closure in the upper spinal region. Here we identify a unifying molecular basis for these observations based on the function of the non-neural ectoderm-specific Grainy head-like genes in mice. Using a gene-targeting approach we show that deletion of Grhl2 results in failed closure 3, with mutants exhibiting a split-face malformation and exencephaly, associated with failure of neuro-epithelial folding at the DLHP. Loss of Grhl3 alone defines a distinct lower spinal closure defect, also with defective DLHP formation. The two genes contribute equally to closure 2, where only Grhl gene dosage is limiting. Combined deletion of Grhl2 and Grhl3 induces severe rostral and caudal neural tube defects, but DLHP-independent closure 1 proceeds normally in the upper spinal region. These findings provide a molecular basis for non-neural ectoderm mediated formation of the DLHP that is critical for complete neuraxis closure. (c) 2010 Elsevier Inc. All rights reserved.

  4. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  5. Analysis of Mining-induced Valley Closure Movements

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Mitra, R.; Oh, J.; Hebblewhite, B.

    2016-05-01

    Valley closure movements have been observed for decades in Australia and overseas when underground mining occurred beneath or in close proximity to valleys and other forms of irregular topographies. Valley closure is defined as the inward movements of the valley sides towards the valley centreline. Due to the complexity of the local geology and the interplay between several geological, topographical and mining factors, the underlying mechanisms that actually cause this behaviour are not completely understood. A comprehensive programme of numerical modelling investigations has been carried out to further evaluate and quantify the influence of a number of these mining and geological factors and their inter-relationships. The factors investigated in this paper include longwall positional factors, horizontal stress, panel width, depth of cover and geological structures around the valley. It is found that mining in a series passing beneath the valley dramatically increases valley closure, and mining parallel to valley induces much more closure than other mining orientations. The redistribution of horizontal stress and influence of mining activity have also been recognised as important factors promoting valley closure, and the effect of geological structure around the valley is found to be relatively small. This paper provides further insight into both the valley closure mechanisms and how these mechanisms should be considered in valley closure prediction models.

  6. Aloe vera: an in vitro study of effects on corneal wound closure and collagenase activity.

    PubMed

    Curto, Elizabeth M; Labelle, Amber; Chandler, Heather L

    2014-11-01

    To evaluate the in vitro effects of an aloe vera solution on (i) the viability and wound healing response of corneal cells and (ii) the ability to alter collagenase and gelatinase activities. Primary cultures of corneal epithelial cells and fibroblasts were prepared from grossly normal enucleated canine globes and treated with an aloe solution (doses ranging from 0.0-2 mg/mL). Cellular viability was evaluated using a colorimetric assay. A corneal wound healing model was used to quantify cellular ingrowth across a defect made on the confluent surface. Anticollagenase and antigelatinase activities were evaluated by incubating a bacterial collagenase/gelatinase with aloe solution (doses ranging from 0.0-500 μg/mL) and comparing outcome measures to a general metalloproteinase inhibitor, 1, 10-phenanthroline, and canine serum (doses ranging from 0.0-100%). None of the concentrations of aloe solution tested significantly affected the viability of corneal epithelial cells or fibroblasts. Concentrations ≤175 μg/mL slightly accelerated corneal epithelial cell wound closure; this change was not significant. Concentrations ≥175 μg/mL significantly (P ≤ 0.001) slowed the rate of corneal fibroblast wound closure, while aloe concentrations <175 μg/mL did not significantly alter fibroblast wound closure. Aloe solution did not alter the ability for collagenase to degrade gelatin or collagen Type I but increased the ability for collagenase to degrade Type IV collagen. Although additional experiments are required, lower concentrations of aloe solution may be beneficial in healing of superficial corneal wounds to help decrease fibrosis and speed epithelialization. An increase in collagenase activity with aloe vera warrants further testing before considering in vivo studies. © 2014 American College of Veterinary Ophthalmologists.

  7. Tissue adhesives for closure of surgical incisions.

    PubMed

    Dumville, Jo C; Coulthard, Paul; Worthington, Helen V; Riley, Philip; Patel, Neil; Darcey, James; Esposito, Marco; van der Elst, Maarten; van Waes, Oscar J F

    2014-11-28

    .33; 10 trials, 736 participants that contributed data to the meta-analysis). The number needed to treat for an additional harmful outcome was calculated as 43. For all other outcomes - infection, patient and operator satisfaction and cost - there was no evidence of a difference for either sutures or tissue adhesives. No evidence of differences was found between tissue adhesives and tapes for minimising dehiscence, infection, patients' assessment of cosmetic appearance, patient satisfaction or surgeon satisfaction. However there was evidence in favour of using tape for surgeons' assessment of cosmetic appearance (mean difference (VAS 0 to 100) 9.56 (95% CI 4.74 to 14.37; 2 trials, 139 participants). One trial compared tissue adhesives with a variety of methods of wound closure and found both patients and clinicians were significantly more satisfied with the alternative closure methods than the adhesives. There appeared to be little difference in outcome for different types of tissue adhesives. One study that compared high viscosity with low viscosity adhesives found that high viscosity adhesives were less time-consuming to use than low viscosity tissue adhesives, but the time difference was small. Sutures are significantly better than tissue adhesives for minimising dehiscence. In some cases tissue adhesives may be quicker to apply than sutures. Although surgeons may consider the use of tissue adhesives as an alternative to other methods of surgical site closure in the operating theatre, they need to be aware that sutures minimise dehiscence. There is a need for more well designed randomised controlled trials comparing tissue adhesives with alternative methods of closure. These trials should include people whose health may interfere with wound healing and surgical sites of high tension.

  8. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Petrello, Jaclyn

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less

  9. Partially Testing a Process Model for Understanding Victim Responses to an Anticipated Worksite Closure

    ERIC Educational Resources Information Center

    Blau, Gary

    2007-01-01

    This study partially tested a recent process model for understanding victim responses to worksite/function closure (W/FC) proposed by Blau [Blau, G. (2006). A process model for understanding victim responses to worksite/function closure. "Human Resource Management Review," 16, 12-28], in a pharmaceutical manufacturing site. Central to the model…

  10. Corrective Action Decision Document/Closure Report for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-08-01

    The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.

  11. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of

  12. Addendum to the Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove

  13. 300 Area waste acid treatment system closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  14. Interferometric Imaging Directly with Closure Phases and Closure Amplitudes

    NASA Astrophysics Data System (ADS)

    Chael, Andrew A.; Johnson, Michael D.; Bouman, Katherine L.; Blackburn, Lindy L.; Akiyama, Kazunori; Narayan, Ramesh

    2018-04-01

    Interferometric imaging now achieves angular resolutions as fine as ∼10 μas, probing scales that are inaccessible to single telescopes. Traditional synthesis imaging methods require calibrated visibilities; however, interferometric calibration is challenging, especially at high frequencies. Nevertheless, most studies present only a single image of their data after a process of “self-calibration,” an iterative procedure where the initial image and calibration assumptions can significantly influence the final image. We present a method for efficient interferometric imaging directly using only closure amplitudes and closure phases, which are immune to station-based calibration errors. Closure-only imaging provides results that are as noncommittal as possible and allows for reconstructing an image independently from separate amplitude and phase self-calibration. While closure-only imaging eliminates some image information (e.g., the total image flux density and the image centroid), this information can be recovered through a small number of additional constraints. We demonstrate that closure-only imaging can produce high-fidelity results, even for sparse arrays such as the Event Horizon Telescope, and that the resulting images are independent of the level of systematic amplitude error. We apply closure imaging to VLBA and ALMA data and show that it is capable of matching or exceeding the performance of traditional self-calibration and CLEAN for these data sets.

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1 and 2, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny

  16. Closure of patent foramen ovale: when and how?

    PubMed

    Lisignoli, Veronica; Lanzone, Alberto M; Zavalloni, Dennis; Pagnotta, Paolo; Presbitero, Patrizia

    2007-10-01

    Percutaneous closure of a patent foramen ovale (PFO) was performed in 98 consecutive patients (mean age 52.5 +/- 13 years, 61 women). Indications included recurrent transient ischaemic attack (47%), cryptogenic stroke (34%), peripheral embolism (11%), disabling migraine with aura (4%), professional scuba diving (1 pt) and severe platypnea-orthodeoxia syndrome (1 pt). Each PFO was characterized by transesophageal echocardiography (TEE) according to anatomy, degree of shunt (1-mild, 2-moderate, 3-severe), right atrial anatomical features relevant for PFO closure (such as presence of an Eustachian valve, Chiari network, lipomatosis or absence of septum secundum) with a new classification scheme. According to this classification successful device delivery was obtained in 100% of pts. Major complications included heparin-induced thrombocytopenia in 1 pt and device dislodgment in 1 pt; minor complications were mostly related to the catheter introduction site (2 pts) and mild immediate shunt (2 pts). In conclusion, percutaneous PFO closure based on strict anatomic criteria is a safe procedure with minimal periprocedural complications.

  17. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  18. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  19. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  20. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  1. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and

  2. Closure Report for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. M. Fitzmaurice

    2001-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box

  3. 36 CFR 13.980 - Other FDA closures and restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...

  4. 36 CFR 13.980 - Other FDA closures and restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...

  5. 36 CFR 13.980 - Other FDA closures and restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...

  6. 36 CFR 13.980 - Other FDA closures and restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...

  7. 36 CFR 13.980 - Other FDA closures and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...

  8. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, V.T.; Russell, C.C.; Smith, K.S.

    2004-01-01

    The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-09-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of

  10. Financial viability, medical technology, and hospital closures.

    PubMed

    Prince, T R; Sullivan, J A

    2000-01-01

    Informed investments in medical technology and information systems are associated with the financial viability of community hospitals. Financially distressed facilities are 3 to 4 years behind proactive hospitals in supporting high-speed data, voice, and image transmissions to physicians in various locations. Impact of the Balanced Budget Act of 1997, fraud and abuse activities, Y2K issues, and lack of information systems support for physicians will result in 800 hospital closures and mergers of distressed hospitals over the next 60 months. These findings are based on the application of an eight-step framework for classifying information systems in health care entities. This framework is validated by survey instruments, site visits, interviews with senior management in 44 health care entities containing 576 hospitals, and judgments on the financial status of the health care entities.

  11. Quick actuating closure

    NASA Technical Reports Server (NTRS)

    White, III, Dorsey E. (Inventor); Updike, deceased, Benjamin T. (Inventor); Allred, Johnny W. (Inventor)

    1989-01-01

    A quick actuating closure for a pressure vessel 80 in which a wedge ring 30 with a conical outer surface 31 is moved forward to force shear blocks 40, with conical inner surfaces 41, radially outward to lock an end closure plug 70 within an opening 81 in the pressure vessel 80. A seal ring 60 and a preload ramp 50 sit between the shear blocks 40 and the end closure plug 70 to provide a backup sealing capability. Conical surfaces 44 and 55 of the preload ramp 50 and the shear blocks 40 interact to force the seal ring 60 into shoulders 73 and 85 in the end closure plug 70 and opening 81 to form a tight seal. The end closure plug 70 is unlocked by moving the wedge ring 30 rearward, which causes T-bars 32 of the wedge ring 30 riding within T -slots 42 of the shear blocks 40 to force them radially inward. The end closure plug 70 is then removed, allowing access to the interior of the pressure vessel 80.

  12. 76 FR 4373 - Notice of Temporary Closure of Caves With Significant Bat Resources on Public Lands in New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Temporary Closure of Caves With Significant Bat Resources on Public Lands in New Mexico AGENCY: Bureau of... temporary closure of caves and abandoned mines (sites) with significant bat resources is in effect on public... bat populations from white- nosed syndrome. DATES: This closure will be in effect from January 25...

  13. Heat Storage and Energy Closure in Two Tropical Montane Forests in Hawaii

    NASA Astrophysics Data System (ADS)

    Mudd, R. G.; Giambelluca, T. W.; Huang, M.

    2012-12-01

    To date, eddy covariance observations of evapotranspiration (ET) in tropical rainforest ecosystems are limited and thorough assessments of such observations are rare. In this study, we present a detailed evaluation of eddy covariance data collected at two sites in Hawaii Volcanoes National Park, Hawaii, for a 34 month period to evaluate the importance of biomass and air heat storage to the energy balance and determine site specific energy closure characteristics. One site is located in a native Hawaiian tropical montane forest dominated by Metrosideros polymorpha (Nahuku), while the other is located in a nearby forest (Olaa) that has been partially invaded by strawberry guava (Psidium cattleianum). Vertical and radial distribution of all biomass components were evaluated from detailed stand surveys, biomass samples, allometric relationships, wood density, fresh to dry weight ratios of plant materials, and temperature measurements of stem biomass. Total fresh biomass was estimated to be 69.8 ± 11.7 kg m-2 and 75.9 ± 16.6 kg m-2 at Nahuku and Olaa, respectively, and the contribution of separate biomass components to energy closure were evaluated in detail. Despite statistically similar fresh biomass between stands, energy storage was found to be significantly greater at the forest site with P. cattleianum tree invasion (Olaa) than at the native forest stand (Nahuku). The difference was attributed to a higher proportion of smaller stems at Olaa, absorbing and releasing more heat for a given mass. Inclusion of biomass and air heat storage in the energy balance improved the relative energy closure, the slope of the linear regression (forced through the origin) of the sum of latent and sensible heat fluxes measured above the canopies for each 30-minute period from 0.767 to 0.805 at Nahuku and from 0.918 to 0.997 at Olaa. The mean absolute energy imbalance, the mean of the differences between the available energy and the sum of latent and sensible heat fluxes for each

  14. Gestalt concept of closure: a construct without closure.

    PubMed

    Wasserstein, Jeanette

    2002-12-01

    This comment reviews the original Gestalt literature which introduced the concept of 'closure'. It is argued that the meaning of 'closure' was confounded in the source literature and, thus, the term connotes more than it denotes. Research based on different measures of this ambiguous construct inevitably may not always converge.

  15. Closure Letter Report for Corrective Action Unit 496: Buried Rocket Site - Antelope Lake

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    A Streamlined Approach for Environmental Restoration (SAFER) Plan for investigation and closure of CAU 496, Corrective Action Site (CAS) TA-55-008-TAAL (Buried Rocket), at the Tonopah Test Range (TTR), was approved by the Nevada Department of Environmental Protection (NDEP) on July 21,2004. Approval to transfer CAS TA-55-008-TAAL from CAU 496 to CAU 4000 (No Further Action Sites) was approved by NDEP on December 21, 2005, based on the assumption that the rocket did not present any environmental concern. The approval letter included the following condition: ''NDEP understands, from the NNSA/NSO letter dated November 30,2005, that a search will be conducted formore » the rocket during the planned characterization of other sites at the Tonopah Test Range and, if found, the rocket will be removed as a housekeeping measure''. NDEP and U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office personnel located the rocket on Mid Lake during a site visit to TTR, and a request to transfer CAS TA-55-008-TAAL from CAU 4000 back to CAU 496 was approved by NDEP on September 11,2006. CAS TA-55-008-TAAL was added to the ''Federal Facility Agreement and Consent Order'' of 1996, based on an interview with a retired TTR worker in 1993. The original interview documented that a rocket was launched from Area 9 to Antelope Lake and was never recovered due to the high frequency of rocket tests being conducted during this timeframe. The interviewee recalled the rocket being an M-55 or N-55 (the M-50 ''Honest John'' rocket was used extensively at TTR from the 1960s to early 1980s). A review of previously conducted interviews with former TTR personnel indicated that the interviewees confused information from several sites. The location of the CAU 496 rocket on Mid Lake is directly south of the TTR rocket launch facility in Area 9 and is consistent with information gathered on the lost rocket during recent interviews. Most pertinently, an interview in 2005 with

  16. Tissue adhesives for closure of surgical incisions.

    PubMed

    Coulthard, Paul; Esposito, Marco; Worthington, Helen V; van der Elst, Maarten; van Waes, Oscar J F; Darcey, James

    2010-05-12

    satisfaction and cost there was no significant difference between sutures and tissue adhesives. No differences were found between tissue adhesives and tapes (2 trials) for minimising dehiscence, infection, patients assessment of cosmetic appearance, patient satisfaction or surgeon satisfaction. However a statistically significant difference in favour of using tape was found for surgeons' assessment of cosmetic appearance (mean difference 13, 95% CI 5 to 21). Tapes were also demonstrated to be significantly faster to use than tissue adhesives as were staples (1 trial). No other outcome measures were analysed in this group. One trial compared tissue adhesives with a variety of methods of wound closure and found both patients and clinicians were significantly more satisfied with the alternative closure methods than the adhesives. In this same trial tissue adhesives were significantly less time consuming to use. For the remaining outcomes of dehiscence and infection no difference was observed between groups. This trial also compared high viscosity with low viscosity adhesives and found that high viscosity adhesives were less time consuming to use than low viscosity tissue adhesives. For all other outcomes of dehiscence, infection, patient satisfaction and operator satisfaction there was no statistically significant difference between high and low viscosity adhesives. Sutures were significantly better than tissue adhesives for minimising dehiscence and were found to be significantly faster to use. Although surgeons may consider the use of tissue adhesives as an alternative to other methods of surgical site closure in the operating theatre they must be aware that adhesives may take more time to apply and that if higher tension is needed upon an incision, sutures may minimise dehiscence. There is a need for more well designed randomised controlled trials comparing tissue adhesives and alternative methods of closure. These trials should include people whose health may interfere with

  17. 50 CFR 622.14 - Area closures related to the Deepwater Horizon oil spill.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Web site: http://sero.nmfs.noaa.gov/deepwater_horizon_oil_spill.htm. (b) Gulf EEZ area closure related... the Gulf EEZ identified in the map shown on the NMFS Web site: http://sero.nmfs.noaa.gov/deepwater... shown on the NMFS Web site: http://sero.nmfs.noaa.gov/deepwater_horizon_oil_spill.htm. ...

  18. Full Life Cycle Research at the Ketzin Pilot Site, Germany - From Safe and Successful CO2 Injection Operation to Post-Injection Monitoring and Site Closure

    NASA Astrophysics Data System (ADS)

    Liebscher, A. H.

    2016-12-01

    The Ketzin pilot site near Berlin, Germany, was initiated in 2004 as the first European onshore storage project for research and development on geological CO2 storage. The operational CO2 injection period started in June 2008 and ended in August 2013 when the site entered the post-injection closure period. During these five years, a total amount of 67 kt of CO2 was safely injected into a saline aquifer (Upper Triassic sandstone) at a depth of 630 m - 650 m. In fall 2013, the first observation well was partially plugged in the reservoir section; full abandonment of this well finished in 2015 after roughly 2 years of well closure monitoring. Abandonment of the remaining 4 wells will be finished by 2017 and hand-over of liability to the competent authority is planned for end of 2017. The CO2 injected was mainly of food grade quality (purity > 99.9%). In addition, 1.5 kt of CO2 from the pilot capture facility "Schwarze Pumpe" (oxyfuel power plant CO2 with purity > 99.7%) was injected in 2011. The injection period terminated with a CO2-N2 co-injection experiment of 650 t of a 95% CO2/5% N2 mixture in summer 2013 to study the effects of impurities in the CO2 stream on the injection operation. During regular operation, the CO2 was pre-heated on-site to 40 - 45°C prior to injection to ensure a single-phase injection process and avoid any phase transition or transient states within the injection facility or the reservoir. Between March and July 2013, just prior to the CO2-N2 co-injection experiment, the injection temperature was stepwise decreased down to 10°C within a "cold-injection" experiment to study the effects of two-phase injection conditions. During injection operation, the combination of different geochemical and geophysical monitoring methods enabled detection and mapping of the spatial and temporal in-reservoir behaviour of the injected CO2 even for small quantities. After the cessation of CO2 injection, post-injection monitoring continued and two additional

  19. Addendum to the Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the July 2003, Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.

  20. Assessment of endocrine-disrupting chemicals attenuation in a coastal plain stream prior to wastewater treatment plant closure

    USGS Publications Warehouse

    Bradley, Paul M.; Journey, Celeste A.

    2014-01-01

    The U.S. Geological Survey is conducting a combined pre/post-closure assessment at a long-term wastewater treatment plant (WWTP) site at Fort Gordon near Augusta, Georgia. Here, we assess select endocrine-active chemicals and benthic macroinvertebrate community structure prior to closure of the WWTP. Substantial downstream transport and limited instream attenuation of endocrine-disrupting chemicals (EDCs) was observed in Spirit Creek over a 2.2-km stream segment downstream of the WWTP outfall. A modest decline (less than 20% in all cases) in surface water detections was observed with increasing distance downstream of the WWTP and attributed to partitioning to the sediment. Estrogens detected in surface water in this study included estrone (E1), 17β-estradiol (E2), and estriol (E3). The 5 ng/l and higher mean estrogen concentrations observed in downstream locations indicated that the potential for endocrine disruption was substantial. Concentrations of alkylphenol ethoxylate (APE) metabolite EDCs also remained statistically elevated above levels observed at the upstream control site. Wastewater-derived pharmaceutical and APE metabolites were detected in the outflow of Spirit Lake, indicating the potential for EDC transport to aquatic ecosystems downstream of Fort Gordon. The results indicate substantial EDC occurrence, downstream transport, and persistence under continuous supply conditions and provide a baseline for a rare evaluation of ecosystem response to WWTP closure.

  1. Impact of Different Standard Type A7A Drum Closure-Ring Practices on Gasket Contraction and Bolt Closure Distance– 15621

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ketusky, Edward; Blanton, Paul; Bobbitt, John H.

    The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactivemore » material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.« less

  2. Cultural Resources Review for Closure of the nonradioactive Dangerous Waste Landfill and Solid Waste Landfill in the 600 Area, Hanford Site, Benton County, Washington, HCRC# 2010-600-018R

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gutzeit, Jennifer L.; Kennedy, Ellen P.; Bjornstad, Bruce N.

    2011-02-02

    The U.S. Department of Energy Richland Operations Office is proposing to close the Nonradioactive Dangerous Waste Landfill (NRDWL) and Solid Waste Landfill (SWL) located in the 600 Area of the Hanford Site. The closure of the NRDWL/SWL entails the construction of an evapotranspiration cover over the landfill. This cover would consist of a 3-foot (1-meter) engineered layer of fine-grained soil, modified with 15 percent by weight pea gravel to form an erosion-resistant topsoil that will sustain native vegetation. The area targeted for silt-loam borrow soil sits in Area C, located in the northern central portion of the Fitzner/Eberhardt Arid Landsmore » Ecology (ALE) Reserve Unit. The pea gravel used for the mixture will be obtained from both off-site commercial sources and an active gravel pit (Pit #6) located just west of the 300 Area of the Hanford Site. Materials for the cover will be transported along Army Loop Road, which runs from Beloit Avenue (near the Rattlesnake Barricade) east-northeast to the NRDWL/SWL, ending at State Route 4. Upgrades to Army Loop Road are necessary to facilitate safe bidirectional hauling traffic. This report documents a cultural resources review of the proposed activity, conducted according to Section 106 of the National Historic Preservation Act of 1966.« less

  3. Engineering study for closure of 209E facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-07-07

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.

  4. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.280 Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 264.278, except that soil-pore liquid monitoring may be terminated 90 days after the last application...

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Strand

    2006-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data

  6. Effectiveness of triclosan-coated PDS Plus versus uncoated PDS II sutures for prevention of surgical site infection after abdominal wall closure: the randomised controlled PROUD trial.

    PubMed

    Diener, Markus K; Knebel, Phillip; Kieser, Meinhard; Schüler, Philipp; Schiergens, Tobias S; Atanassov, Vladimir; Neudecker, Jens; Stein, Erwin; Thielemann, Henryk; Kunz, Reiner; von Frankenberg, Moritz; Schernikau, Utz; Bunse, Jörg; Jansen-Winkeln, Boris; Partecke, Lars I; Prechtl, Gerald; Pochhammer, Julius; Bouchard, Ralf; Hodina, René; Beckurts, K Tobias E; Leißner, Lothar; Lemmens, Hans-Peter; Kallinowski, Friedrich; Thomusch, Oliver; Seehofer, Daniel; Simon, Thomas; Hyhlik-Dürr, Alexander; Seiler, Christoph M; Hackert, Thilo; Reissfelder, Christoph; Hennig, René; Doerr-Harim, Colette; Klose, Christina; Ulrich, Alexis; Büchler, Markus W

    2014-07-12

    Postoperative surgical site infections are one of the most frequent complications after open abdominal surgery, and triclosan-coated sutures were developed to reduce their occurrence. The aim of the PROUD trial was to obtain reliable data for the effectiveness of triclosan-coated PDS Plus sutures for abdominal wall closure, compared with non-coated PDS II sutures, in the prevention of surgical site infections. This multicentre, randomised controlled group-sequential superiority trial was done in 24 German hospitals. Adult patients (aged ≥18 years) who underwent elective midline abdominal laparotomy for any reason were eligible for inclusion. Exclusion criteria were impaired mental state, language problems, and participation in another intervention trial that interfered with the intervention or outcome of this trial. A central web-based randomisation tool was used to randomly assign eligible participants by permuted block randomisation with a 1:1 allocation ratio and block size 4 before mass closure to either triclosan-coated sutures (PDS Plus) or uncoated sutures (PDS II) for abdominal fascia closure. The primary endpoint was the occurrence of superficial or deep surgical site infection according to the Centers for Disease Control and Prevention criteria within 30 days after the operation. Patients, surgeons, and the outcome assessors were masked to group assignment. Interim and final analyses were by modified intention to treat. This trial is registered with the German Clinical Trials Register, number DRKS00000390. Between April 7, 2010, and Oct 19, 2012, 1224 patients were randomly assigned to intervention groups (607 to PDS Plus, and 617 to PDS II), of whom 1185 (587 PDS Plus and 598 PDS II) were analysed by intention to treat. The study groups were well balanced in terms of patient and procedure characteristics. The occurrence of surgical site infections did not differ between the PDS Plus group (87 [14·8%] of 587) and the PDS II group (96 [16·1%] of 598

  7. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2013-01-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)

  8. Biological constraints do not entail cognitive closure.

    PubMed

    Vlerick, Michael

    2014-12-01

    From the premise that our biology imposes cognitive constraints on our epistemic activities, a series of prominent authors--most notably Fodor, Chomsky and McGinn--have argued that we are cognitively closed to certain aspects and properties of the world. Cognitive constraints, they argue, entail cognitive closure. I argue that this is not the case. More precisely, I detect two unwarranted conflations at the core of arguments deriving closure from constraints. The first is a conflation of what I will refer to as 'representation' and 'object of representation'. The second confuses the cognitive scope of the assisted mind for that of the unassisted mind. Cognitive closure, I conclude, cannot be established from pointing out the (uncontroversial) existence of cognitive constraints. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Stump closure of a thick pancreas using stapler closure increases pancreatic fistula after distal pancreatectomy.

    PubMed

    Kawai, Manabu; Tani, Masaji; Okada, Ken-ichi; Hirono, Seiko; Miyazawa, Motoki; Shimizu, Astusi; Kitahata, Yuji; Yamaue, Hiroki

    2013-09-01

    The appropriate surgical stump closure after distal pancreatectomy (DP) is still controversial. This study investigated the benefits and risks of stapler closure during DP. The risk factors of pancreatic fistulas were investigated in 122 DPs among 3 types of stump closure: hand-sewn suture (n = 32), bipolar scissors (n = 45), and stapler closure (n = 45). There was no significant difference in the incidence of pancreatic fistula between the 3 types of stump closure (hand-sewn suture [44%] vs bipolar scissors [37.7%] vs stapler closure [35.5%]). By using receiver operating characteristics curves, 12 mm was the best cutoff value of the thickness of the pancreas for pancreatic fistulas after DP using stapler closure. Three factors (ie, male sex, body mass index >25 kg/m(2), and stapler closure) were independent risk factors of pancreatic fistulas after DP with a pancreas thicker than 12 mm. A pancreas thicker than 12 mm significantly increased the incidence of pancreatic fistulas after DP using stapler closure. Copyright © 2013 Elsevier Inc. All rights reserved.

  10. MANTA, a novel plug-based vascular closure device for large bore arteriotomies: technical report.

    PubMed

    van Gils, Lennart; Daemen, Joost; Walters, Greg; Sorzano, Todd; Grintz, Todd; Nardone, Sam; Lenzen, Mattie; De Jaegere, Peter P T; Roubin, Gary; Van Mieghem, Nicolas M

    2016-09-18

    Catheter-based interventions have become a less invasive alternative to conventional surgical techniques for a wide array of cardiovascular diseases but often create large arteriotomies. A completely percutaneous technique is attractive as it may reduce the overall complication rate and procedure time. Currently, large bore arteriotomy closure relies on suture-based techniques. Access-site complications are not uncommon and often seem related to closure device failure. The MANTA VCD is a novel collagen-based closure device that specifically targets arteriotomies between 10 and 22 Fr. This technical report discusses the MANTA design concept, practical instructions for use and preliminary clinical experience.

  11. A Conserved Surface Loop in Type I Dehydroquinate Dehydratases Positions an Active Site Arginine and Functions in Substrate Binding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Light, Samuel H.; Minasov, George; Shuvalova, Ludmilla

    2012-04-18

    Dehydroquinate dehydratase (DHQD) catalyzes the third step in the biosynthetic shikimate pathway. We present three crystal structures of the Salmonella enterica type I DHQD that address the functionality of a surface loop that is observed to close over the active site following substrate binding. Two wild-type structures with differing loop conformations and kinetic and structural studies of a mutant provide evidence of both direct and indirect mechanisms of involvement of the loop in substrate binding. In addition to allowing amino acid side chains to establish a direct interaction with the substrate, closure of the loop necessitates a conformational change ofmore » a key active site arginine, which in turn positions the substrate productively. The absence of DHQD in humans and its essentiality in many pathogenic bacteria make the enzyme a target for the development of nontoxic antimicrobials. The structures and ligand binding insights presented here may inform the design of novel type I DHQD inhibiting molecules.« less

  12. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less

  13. Corrective Action Decision Document/Closure Report for Corrective Action 405: Area 3 Septic Systems, Tonopah Test Range, Nevada Rev. No.: 0, April 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IT Coroporation, Las Vegas, NV

    2002-04-17

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 405, Area 3 Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. Located on the Tonopah Test Range (TTR) approximately 235 miles north of Las Vegas, Nevada, CAU 405 consists of three Corrective Action Sites (CASs): 03-05-002-SW03, Septic Waste System (aka: Septic Waste System [SWS] 3); 03-05-002-SW04, Septic Waste System (aka: SWS 4); 03-05-002-SW07, Septic Waste System (aka: SWS 7). The CADD and CR have been combined into one report because no further action is recommended for this CAU, and this reportmore » provides specific information necessary to support this recommendation. The CAU consists of three leachfields and associated collection systems that were installed in or near Area 3 for wastewater disposal. These systems were used until a consolidated sewer system was installed in 1990. Historically, operations within various buildin gs in and near Area 3 of the TTR generated sanitary and industrial wastewaters. There is a potential that contaminants of concern (COCs) were present in the wastewaters and were disposed of in septic tanks and leachfields. The justification for closure of this CAU without further action is based on process knowledge and the results of the investigative activities. Closure activities were performed at these CASs between January 14 and February 2, 2002, and included the removal and proper disposal of media containing regulated constituents and proper closure of septic tanks. No further action is appropriate because all necessary activities have been completed. No use restrictions are required to be imposed for these sites since the investigation showed no evidence of COCs identified in the soil for CAU 405.« less

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick and Sloop, Christy

    2011-04-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high

  15. The Use of ExoSeal Vascular Closure Device for Direct Antegrade Superficial Femoral Artery Puncture Site Hemostasis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rimon, Uri, E-mail: rimonu@sheba.health.gov.il; Khaitovich, Boris, E-mail: borislena@012.net.il; Yakubovich, Dmitry, E-mail: Dmitry.Yakubovitch@sheba.health.gov.il

    2015-06-15

    PurposeThis study was designed to assess the efficacy and safety of the ExoSeal vascular closure device (VCD) to achieve hemostasis in antegrade access of the superficial femoral artery (SFA).MethodsWe retrospectively reviewed the outcome of ExoSeal VCD used for hemostasis in 110 accesses to the SFA in 93 patients between July 2011 and July 2013. All patients had patent proximal SFA based on computer tomography angiography or ultrasound duplex. Arterial calcifications at puncture site were graded using fluoroscopy. The SFA was accessed in an antegrade fashion with ultrasound or fluoroscopic guidance. In all patients, 5–7F vascular sheaths were used. The ExoSealmore » VCD was applied to achieve hemostasis at the end of the procedure. All patients were clinically examined and had ultrasound duplex exam for any puncture site complications during the 24 h postprocedure.ResultsIn all procedures, the ExoSeal was applied successfully. We did not encounter any device-related technical failure. There were four major complications in four patients (3.6 %): three pseudoaneurysms, which were treated with direct thrombin injection, and one hematoma, which necessitated transfusion of two blood units. All patients with complications were treated with anticoagulation preprocedure or received thrombolytic therapy.ConclusionsThe ExoSeal VCD can be safely used for antegrade puncture of the SFA, with a high procedural success rate (100 %) and a low rate of access site complications (3.6 %)« less

  16. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2011-09-01

    knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less

  17. Primary closure versus delayed closure for non bite traumatic wounds within 24 hours post injury.

    PubMed

    Eliya-Masamba, Martha C; Banda, Grace W

    2013-10-22

    Acute traumatic wounds are one of the common reasons why people present to the emergency department. Primary closure has traditionally been reserved for traumatic wounds presenting within six hours of injury and considered 'clean' by the attending surgeon, with the rest undergoing delayed primary closure as a means of controlling wound infection. Primary closure has the potential benefit of rapid wound healing but poses the potential threat of increased wound infection. There is currently no evidence to guide clinical decision-making on the best timing for closure of traumatic wounds. To determine the effect on time to healing of primary closure versus delayed closure for non bite traumatic wounds presenting within 24 hours post injury. To explore the adverse effects of primary closure compared with delayed closure for non bite traumatic wounds presenting within 24 hours post injury. In May 2013, for this first update we searched the Cochrane Wounds Group Specialised Register; the Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library); Ovid MEDLINE; Ovid MEDLINE (In-Process & Other Non-Indexed Citations); Ovid EMBASE; and EBSCO CINAHL. There were no restrictions with respect to language, date of publication or study setting. Randomised controlled trials comparing primary closure with delayed closure of non bite traumatic wounds. Two review authors independently evaluated the results of the searches against the inclusion criteria. No studies met the inclusion criteria for this review. Since no studies met the inclusion criteria, neither a meta-analysis nor a narrative description of studies was possible. There is currently no systematic evidence to guide clinical decision-making regarding the timing for closure of traumatic wounds. There is a need for robust research to investigate the effect of primary closure compared with delayed closure for non bite traumatic wounds presenting within 24 hours of injury.

  18. Primary closure after carotid endarterectomy is not inferior to other closure techniques.

    PubMed

    Avgerinos, Efthymios D; Chaer, Rabih A; Naddaf, Abdallah; El-Shazly, Omar M; Marone, Luke; Makaroun, Michel S

    2016-09-01

    Primary closure after carotid endarterectomy (CEA) has been much maligned as an inferior technique with worse outcomes than in patch closure. Our purpose was to compare perioperative and long-term results of different CEA closure techniques in a large institutional experience. A consecutive cohort of CEAs between January 1, 2000, and December 31, 2010, was retrospectively analyzed. Closure technique was used to divide patients into three groups: primary longitudinal arteriotomy closure (PRC), patch closure (PAC), and eversion closure (EVC). End points were perioperative events, long-term strokes, and restenosis ≥70%. Multivariate regression models were used to assess the effect of baseline predictors. There were 1737 CEA cases (bilateral, 143; mean age, 71.4 ± 9.3 years; 56.2% men; 35.3% symptomatic) performed during the study period with a mean clinical follow-up of 49.8 ± 36.4 months (range, 0-155 months). More men had primary closure, but other demographic and baseline symptoms were similar between groups. Half the patients had PAC, with the rest evenly distributed between PRC and EVC. The rate of nerve injury was 2.7%, the rate of reintervention for hematoma was 1.5%, and the length of hospital stay was 2.4 ± 3.0 days, with no significant differences among groups. The combined stroke and death rate was 2.5% overall and 3.9% and 1.7% in the symptomatic and asymptomatic cohort, respectively. Stroke and death rates were similar between groups: PRC, 11 (2.7%); PAC, 19 (2.2%); EVC, 13 (2.9%). Multivariate analysis showed baseline symptomatic disease (odds ratio, 2.4; P = .007) and heart failure (odds ratio, 3.1; P = .003) as predictors of perioperative stroke and death, but not the type of closure. Cox regression analysis demonstrated, among other risk factors, no statin use (hazard ratio, 2.1; P = .008) as a predictor of ipsilateral stroke and severe (glomerular filtration rate <30 mL/min/1.73 m(2)) renal insufficiency (hazard ratio, 2.6; P

  19. Consequences of age on ischemic wound healing in rats: altered antioxidant activity and delayed wound closure.

    PubMed

    Moor, Andrea N; Tummel, Evan; Prather, Jamie L; Jung, Michelle; Lopez, Jonathan J; Connors, Sarah; Gould, Lisa J

    2014-04-01

    Advertisements targeted at the elderly population suggest that antioxidant therapy will reduce free radicals and promote wound healing, yet few scientific studies substantiate these claims. To better understand the potential utility of supplemental antioxidant therapy for wound healing, we tested the hypothesis that age and tissue ischemia alter the balance of endogenous antioxidant enzymes. Using a bipedicled skin flap model, ischemic and non-ischemic wounds were created on young and aged rats. Wound closure and the balance of the critical antioxidants superoxide dismutase and glutathione in the wound bed were determined. Ischemia delayed wound closure significantly more in aged rats. Lower superoxide dismutase 2 and glutathione in non-ischemic wounds of aged rats indicate a basal deficit due to age alone. Ischemic wounds from aged rats had lower superoxide dismutase 2 protein and activity initially, coupled with decreased ratios of reduced/oxidized glutathione and lower glutathione peroxidase activity. De novo glutathione synthesis, to restore redox balance in aged ischemic wounds, was initiated as evidenced by increased glutamate cysteine ligase. Results demonstrate deficiencies in two antioxidant pathways in aged rats that become exaggerated in ischemic tissue, culminating in profoundly impaired wound healing and prolonged inflammation.

  20. Mechanics of epithelial closure over non-adherent environments

    NASA Astrophysics Data System (ADS)

    Vedula, Sri Ram Krishna; Peyret, Grégoire; Cheddadi, Ibrahim; Chen, Tianchi; Brugués, Agustí; Hirata, Hiroaki; Lopez-Menendez, Horacio; Toyama, Yusuke; Neves de Almeida, Luís; Trepat, Xavier; Lim, Chwee Teck; Ladoux, Benoit

    2015-01-01

    The closure of gaps within epithelia is crucial to maintain its integrity during biological processes such as wound healing and gastrulation. Depending on the distribution of extracellular matrix, gap closure occurs through assembly of multicellular actin-based contractile cables or protrusive activity of border cells into the gap. Here we show that the supracellular actomyosin contractility of cells near the gap edge exerts sufficient tension on the surrounding tissue to promote closure of non-adherent gaps. Using traction force microscopy, we observe that cell-generated forces on the substrate at the gap edge first point away from the centre of the gap and then increase in the radial direction pointing into the gap as closure proceeds. Combining with numerical simulations, we show that the increase in force relies less on localized purse-string contractility and more on large-scale remodelling of the suspended tissue around the gap. Our results provide a framework for understanding the assembly and the mechanics of cellular contractility at the tissue level.

  1. May Dietary Supplementation Augment Respiratory Burst in Wound-Site Inflammatory Cells?

    PubMed

    Das, Amitava; Dickerson, Ryan; Ghatak, Piya Das; Gordillo, Gayle M; Chaffee, Scott; Saha, Abhijoy; Khanna, Savita; Roy, Sashwati

    2018-02-10

    Persistent infection contributes to wound chronicity. At the wound site, NADPH oxidase (NOX) activity in immune cells fights infection to enable the healing process. Fermented papaya preparation (FPP) is a carbohydrate-rich nutritional supplement that has demonstrated ability to bolster respiratory burst in experimental rodent systems. In FPP, glucose coexists with fructose and maltose in addition to multiple other sugar alcohols such as inositol. We have previously reported that FPP supplementation augments wound healing in diabetic mice via improvement of respiratory burst activity of wound innate immune cells. In this clinical study ( clinicaltrials.gov : NCT02332993), chronic wound patients were orally supplemented with FPP daily. Inducible production of reactive oxygen species was significantly higher in wound-site immune cells from patients supplemented with FPP and on standard of care (SoC) for wound management compared with those patients receiving SoC alone. Wound closure in FPP-supplemented patients showed improvement. Importantly, the consumption of this mixture of carbohydrates, including significant amounts of glucose, did not increase HbA1c. These observations warrant a full-length clinical trial testing the hypothesis that FPP improves wound closure by augmenting NOX activity in immune cells at the wound site. Antioxid. Redox Signal. 28, 401-405.

  2. Final closure of a low level waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Potier, J.M.

    1995-12-31

    The low-level radioactive waste disposal facility operated by the Agence Nationale pour la Gestion des Dechets Radioactifs near La Hague, France was opened in 1969 and is scheduled for final closure in 1996. The last waste package was received in June 1994. The total volume of disposed waste is approximately 525,000 m{sup 3}. The site closure consists of covering the disposal structures with a multi-layer impervious cap system to prevent rainwater from infiltrating the waste isolation system. A monitoring system has been set up to verify the compliance of infiltration rates with hydraulic performance objectives (less than 10 liters permore » square meter and per year).« less

  3. The TopClosure® 3S System, for skin stretching and a secure wound closure.

    PubMed

    Topaz, Moris; Carmel, Narin-Nard; Silberman, Adi; Li, Ming Sen; Li, Yong Zhong

    2012-07-01

    The principle of stretching wound margins for primary wound closure is commonly practiced and used for various skin defects, leading at times to excessive tension and complications during wound closure. Different surgical techniques, skin stretching devices and tissue expanders have been utilized to address this issue. Previously designed skin stretching devices resulted in considerable morbidity. They were invasive by nature and associated with relatively high localized tissue pressure, frequently leading to necrosis, damage and tearing of skin at the wound margins. To assess the clinical effectiveness and performance and, to determine the safety of TopClosure® for gradual, controlled, temporary, noninvasive and invasive applications for skin stretching and secure wound closing, the TopClosure® device was applied to 20 patients for preoperative skin lesion removal and to secure closure of a variety of wound sizes. TopClosure® was reinforced with adhesives, staples and/or surgical sutures, depending on the circumstances of the wound and the surgeon's judgment. TopClosure® was used prior to, during and/or after surgery to reduce tension across wound edges. No significant complications or adverse events were associated with its use. TopClosure® was effectively used for preoperative skin expansion in preparation for dermal resection (e.g., congenital nevi). It aided closure of large wounds involving significant loss of skin and soft tissue by mobilizing skin and subcutaneous tissue, thus avoiding the need for skin grafts or flaps. Following surgery, it was used to secure closure of wounds under tension, thus improving wound aesthetics. A sample case study will be presented. We designed TopClosure®, an innovative device, to modify the currently practiced concept of wound closure by applying minimal stress to the skin, away from damaged wound edges, with flexible force vectors and versatile methods of attachment to the skin, in a noninvasive or invasive manner.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 482: Area 15 U15a/e Muckpiles and Ponds Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    PALs defined in the CAIP, and because none of the preliminary action levels (PALs) were exceeded, the PALs became the FALs. The radionuclide FALs were calculated using the Residual Radioactive (RESRAD) code (version 6.21). The RESRAD calculation determined the activities of all radionuclides that together would sum to an exposure dose of 25 millirem per year to a site receptor (based on their relative abundances at each CAS). Based on the field investigation, the following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) CAS 15-06-01 - None. (2) CAS 15-06-02 - Cs-137 and Pu-239. (3) CAS 15-38-01 - Am-241, Cs-137, Pu-238, and Pu-239. (4) Drainage below CAS 15-06-02 - Cs-137 and Pu-239. Based on the data and risk evaluations, the DQO data needs presented in the Corrective Action Investigation Plan were met, and the data accurately represent the radiological and chemical risk present at CAU 482. Based on the results of the CAI data evaluation, it was determined that closure in place with use restrictions is the appropriate corrective action for CAU 482 and that use restrictions will effectively control exposure to future land users. This is based on the fact that even though the FALs were exceeded in a few samples, this remote, controlled access site poses only limited risk overall to public health and the environment. Given the relatively low levels of contamination present, it would create a greater hazard to worker safety, public health, and the environment to remove the contamination, transport it, and bury it at another location. Therefore, DTRA provides the following recommendations: (1) Close COCs in place at CAS 15-06-02, CAS 15-38-01, and the drainage below CAS 15-06-02 with use restrictions. (2) No further action for CAU 482. (3) A Notice of Completion be issued to DTRA by the Nevada Division of Environmental Protection for closure of CAU 482. (4) Move CAU 482 from Appendix III to Appendix IV of the Federal

  5. 40 CFR 264.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 264.146 Section 264.146 Protection of Environment... mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or more...

  6. Partial growth plate closure: apex view on bone scan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howman-Giles, R.; Trochei, M.; Yeates, K.

    1985-01-01

    A new technique of using /sup 99m/Tc bone scan to assess partial closure of the growth plate is described. The site and degree of osseous fusion can be obtained by using the apex view. The technique has the potential of assessing serially the growth of a plate before and after surgery.

  7. Identification of Selected Child-Resistant Closures (Continuous Thread, Lug-Bayonet, and Snap Closures).

    ERIC Educational Resources Information Center

    Gross, Rosalind L.; White, Harry E.

    This publication describes a selected group of child-resistant closures used in packaging five categories of medicine and household products. The material in the document was collected to train survey personnel to identify closures for a planned household study of the effectiveness of child-resistant packaging. The 39 closures described are of…

  8. 40 CFR 265.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 265.146 Section 265.146 Protection of Environment... Use of a mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or...

  9. A novel one-shot circular stapler closure for atrial septal defect in a beating-heart porcine model.

    PubMed

    Tarui, Tatsuya; Tomita, Shigeyuki; Ishikawa, Norihiko; Ohtake, Hiroshi; Watanabe, Go

    2015-02-01

    In surgical atrial septal defect (ASD) closure, there are no techniques or devices that can close the ASD accurately in a short time under a beating heart. We have developed a simple and automatic ASD closure technique using a circular stapler. This study assessed the feasibility and efficacy of a new circular stapler closure for ASD. Under a continuous beating heart, hand-sewn patch plasty ASD closure was performed in 6 pigs (group A) and circular stapler ASD closure was performed in 6 pigs (group B). The time to close the ASD and the effectiveness of the closure were compared. Closure was significantly faster in group B (10.5 ± 1.0 seconds) than in group A (664 ± 10 seconds; p < 0.05). There was no leakage at the closure site, and sufficient tolerance was confirmed. A circular stapler can be used to treat ASD faster than hand-sewn patch plasty, with sufficient pressure tolerance in a beating heart porcine model. Copyright © 2015 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  10. A regenerative approach towards mucosal fenestration closure

    PubMed Central

    Gandi, Padma; Anumala, Naveen; Reddy, Amarender; Viswa Chandra, Rampalli

    2013-01-01

    Mucosal fenestration is an opening or an interstice through the oral mucosa. A lesion which occurs with greater frequency than generally realised, its occurrence is attributed to a myriad of causes. Mucogingival procedures including connective tissue grafts, free gingival grafts and lateral pedicle grafts are generally considered to be the treatment of choice in the closure of a mucosal fenestration. More often, these procedures are performed in conjunction with other procedures such as periradicular surgery and with bone grafts. However, the concomitant use of gingival grafts and bone grafts in mucosal fenestrations secondary to infections in sites exhibiting severe bone loss is highly debatable. In this article, we report two cases of mucosal fenestrations secondary to trauma and their management by regenerative periodontal surgery with the placement of guided tissue regeneration membrane and bone graft. The final outcome was a complete closure of the fenestration in both the cases. PMID:23749826

  11. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less

  12. Hanford Facility Dangerous Waste Closure Plan - Plutonium Finishing Plant Treatment Unit Glovebox HA-20MB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PRIGNANO, A.L.

    2003-06-25

    This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only

  13. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  14. Mechanics of epithelial closure over non-adherent environments

    PubMed Central

    Vedula, Sri Ram Krishna; Peyret, Grégoire; Cheddadi, Ibrahim; Chen, Tianchi; Brugués, Agustí; Hirata, Hiroaki; Lopez-Menendez, Horacio; Toyama, Yusuke; Neves de Almeida, Luís; Trepat, Xavier; Lim, Chwee Teck; Ladoux, Benoit

    2015-01-01

    The closure of gaps within epithelia is crucial to maintain its integrity during biological processes such as wound healing and gastrulation. Depending on the distribution of extracellular matrix, gap closure occurs through assembly of multicellular actin-based contractile cables or protrusive activity of border cells into the gap. Here we show that the supracellular actomyosin contractility of cells near the gap edge exerts sufficient tension on the surrounding tissue to promote closure of non-adherent gaps. Using traction force microscopy, we observe that cell-generated forces on the substrate at the gap edge first point away from the centre of the gap and then increase in the radial direction pointing into the gap as closure proceeds. Combining with numerical simulations, we show that the increase in force relies less on localized purse-string contractility and more on large-scale remodelling of the suspended tissue around the gap. Our results provide a framework for understanding the assembly and the mechanics of cellular contractility at the tissue level. PMID:25608921

  15. Public outreach supports the entire life-cycle of the Ketzin pilot site, Germany

    NASA Astrophysics Data System (ADS)

    Martens, Sonja; Kollersberger, Tanja; Möller, Fabian; Liebscher, Axel

    2017-04-01

    Interdisciplinary research at the Ketzin pilot site in Germany contributes to the understanding of the geological CO2 storage since 2004. In addition to the research activities, public outreach has been a key element through the entire life-cycle of the project including site assessment, characterization, development as well as operation (2008-2013) and post-closure. From the very beginning of the project, the research activities were accompanied by an open dialogue with the general public including locals and interested people from all over Germany and the world. The visitor centre at the Ketzin site is run by GFZ and the most important contact point to inform about first-hand experiences from the project. Up to now, about 3,000 visitors came to the Ketzin site for guided tours and the annual open house days. In addition, project status and progress are disseminated in brochures and on the public website www.co2ketzin.de. The Ketzin project is also presented in short films, e.g. on monitoring, drilling and well closure. As the post-closure and pre-transfer phase started after the cease of CO2 injection in August 2013 and the injection facility was dismantled in December 2013, we were looking for a tool to further inform about the previous operation and site infrastructure. A virtual tour was set up for the Ketzin site which is accessible via the website. This tour includes several videos which virtually guide you on site and provide information on the (former) facilities. Public acceptance is a key issue for the Ketzin project as it is for any other CO2 storage project. For example, an open communication with the local residents helped to conduct large-scale seismic campaigns without severe restrictions. The experience from the Ketzin pilot site shows that honest communication and a diverse dissemination program is able to overcome critical public perception even for highly debated technologies.

  16. Addendum to the Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a

  17. Normal Modes Expose Active Sites in Enzymes.

    PubMed

    Glantz-Gashai, Yitav; Meirson, Tomer; Samson, Abraham O

    2016-12-01

    Accurate prediction of active sites is an important tool in bioinformatics. Here we present an improved structure based technique to expose active sites that is based on large changes of solvent accessibility accompanying normal mode dynamics. The technique which detects EXPOsure of active SITes through normal modEs is named EXPOSITE. The technique is trained using a small 133 enzyme dataset and tested using a large 845 enzyme dataset, both with known active site residues. EXPOSITE is also tested in a benchmark protein ligand dataset (PLD) comprising 48 proteins with and without bound ligands. EXPOSITE is shown to successfully locate the active site in most instances, and is found to be more accurate than other structure-based techniques. Interestingly, in several instances, the active site does not correspond to the largest pocket. EXPOSITE is advantageous due to its high precision and paves the way for structure based prediction of active site in enzymes.

  18. Normal Modes Expose Active Sites in Enzymes

    PubMed Central

    Glantz-Gashai, Yitav; Samson, Abraham O.

    2016-01-01

    Accurate prediction of active sites is an important tool in bioinformatics. Here we present an improved structure based technique to expose active sites that is based on large changes of solvent accessibility accompanying normal mode dynamics. The technique which detects EXPOsure of active SITes through normal modEs is named EXPOSITE. The technique is trained using a small 133 enzyme dataset and tested using a large 845 enzyme dataset, both with known active site residues. EXPOSITE is also tested in a benchmark protein ligand dataset (PLD) comprising 48 proteins with and without bound ligands. EXPOSITE is shown to successfully locate the active site in most instances, and is found to be more accurate than other structure-based techniques. Interestingly, in several instances, the active site does not correspond to the largest pocket. EXPOSITE is advantageous due to its high precision and paves the way for structure based prediction of active site in enzymes. PMID:28002427

  19. Hamiltonian closures in fluid models for plasmas

    NASA Astrophysics Data System (ADS)

    Tassi, Emanuele

    2017-11-01

    This article reviews recent activity on the Hamiltonian formulation of fluid models for plasmas in the non-dissipative limit, with emphasis on the relations between the fluid closures adopted for the different models and the Hamiltonian structures. The review focuses on results obtained during the last decade, but a few classical results are also described, in order to illustrate connections with the most recent developments. With the hope of making the review accessible not only to specialists in the field, an introduction to the mathematical tools applied in the Hamiltonian formalism for continuum models is provided. Subsequently, we review the Hamiltonian formulation of models based on the magnetohydrodynamics description, including those based on the adiabatic and double adiabatic closure. It is shown how Dirac's theory of constrained Hamiltonian systems can be applied to impose the incompressibility closure on a magnetohydrodynamic model and how an extended version of barotropic magnetohydrodynamics, accounting for two-fluid effects, is amenable to a Hamiltonian formulation. Hamiltonian reduced fluid models, valid in the presence of a strong magnetic field, are also reviewed. In particular, reduced magnetohydrodynamics and models assuming cold ions and different closures for the electron fluid are discussed. Hamiltonian models relaxing the cold-ion assumption are then introduced. These include models where finite Larmor radius effects are added by means of the gyromap technique, and gyrofluid models. Numerical simulations of Hamiltonian reduced fluid models investigating the phenomenon of magnetic reconnection are illustrated. The last part of the review concerns recent results based on the derivation of closures preserving a Hamiltonian structure, based on the Hamiltonian structure of parent kinetic models. Identification of such closures for fluid models derived from kinetic systems based on the Vlasov and drift-kinetic equations are presented, and

  20. Initial experience with the Cardiva Boomerang vascular closure device in diagnostic catheterization.

    PubMed

    Doyle, Brendan J; Godfrey, Michael J; Lennon, Ryan J; Ryan, James L; Bresnahan, John F; Rihal, Charanjit S; Ting, Henry H

    2007-02-01

    The authors studied the safety and efficacy of the Cardiva Boomerang vascular closure device in patients undergoing diagnostic cardiac catheterization. Conventional vascular closure devices (sutures, collagen plugs, or metal clips) have been associated with catastrophic complications including arterial occlusion and foreign body infections; furthermore, they cannot be utilized in patients with peripheral vascular disease or vascular access site in a vessel other than the common femoral artery. The Cardiva Boomerang device facilitates vascular hemostasis without leaving any foreign body behind at the access site, can be used in peripheral vascular disease, and can be used in vessels other than the common femoral artery A total of 96 patients undergoing transfemoral diagnostic cardiac catheterization were included in this study, including 25 (26%) patients with contraindications to conventional closure devices. Femoral angiography was performed prior to deployment of the Cardiva Boomerang closure device. Patients were ambulated at 1 hr after hemostasis was achieved. The device was successfully deployed and hemostasis achieved with the device alone in 95 (99%) patients. The device failed to deploy in 1 (1%) patient and required conversion to standard manual compression. Minor complications were observed in 5 (5%) patients. No patients experienced major complications including femoral hematoma > 4 cm, red blood cell transfusion, retroperitoneal bleed, arteriovenous fistula, pseudoaneurysm, infection, arterial occlusion, or vascular surgery. The Cardiva Boomerang device is safe and effective in patients undergoing diagnostic cardiac catheterization using the transfemoral approach, facilitating early ambulation with low rates of vascular complications. (c) 2006 Wiley-Liss, Inc.

  1. Integration of actomyosin contractility with cell-cell adhesion during dorsal closure.

    PubMed

    Duque, Julia; Gorfinkiel, Nicole

    2016-12-15

    In this work, we combine genetic perturbation, time-lapse imaging and quantitative image analysis to investigate how pulsatile actomyosin contractility drives cell oscillations, apical cell contraction and tissue closure during morphogenesis of the amnioserosa, the main force-generating tissue during the dorsal closure in Drosophila We show that Myosin activity determines the oscillatory and contractile behaviour of amnioserosa cells. Reducing Myosin activity prevents cell shape oscillations and reduces cell contractility. By contrast, increasing Myosin activity increases the amplitude of cell shape oscillations and the time cells spend in the contracted phase relative to the expanded phase during an oscillatory cycle, promoting cell contractility and tissue closure. Furthermore, we show that in AS cells, Rok controls Myosin foci formation and Mbs regulates not only Myosin phosphorylation but also adhesion dynamics through control of Moesin phosphorylation, showing that Mbs coordinates actomyosin contractility with cell-cell adhesion during amnioserosa morphogenesis. © 2016. Published by The Company of Biologists Ltd.

  2. 2010 Annual Summary Report for the Area 3 and Area 5 Radioactive Management Sites at the Nevada National Security Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    2011-03-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at themore » Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.« less

  3. Observations on early and delayed colostomy closure.

    PubMed

    Tade, A O; Salami, B A; Ayoade, B A

    2011-06-01

    Traditional treatment of a variety of colorectal pathologies had included a diverting colostomy that was closed eight or more weeks later during a readmission. The aim of this retrospective study was to determine the outcomes of early colostomy closure and delayed colostomy closure in patients with temporary colostomies following traumatic and non-traumatic colorectal pathologies. In this study early colostomy closure was the closure of a colostomy within three weeks of its construction, while delayed colostomy closure referred to closure after 3 weeks. Complete records of the 37 adult patients who had temporary colostomy constructed and closed between Jan. 1997 December 2003 for various colorectal pathologies were studied. Fourteen patients had early colostomy closure while 23 had delayed closure. In the early colostomy closure group there were 10 men and 4 women. The mean age of the patients was 28yr with a range of 18-65yr. Colostomies were closed 9-18 days after initial colostomy construction. There was no mortality. Morbidity rate 28.6% (4 out of 14). There were two faecal fistulas (14.3%). Twenty-three patients had delayed colostomy closure 8 weeks to 18 months after initial colostomy construction. These were patients unfit for early surgery after initial colostomy construction because of carcinoma, significant weight loss, or sepsis. There was no mortality. Morbidity rate was 26.1%. There were 3 faecal fistulas (13.2%). Outcomes following early colostomy closure and delayed closure were comparable. Patients fit for surgery should have early closure whilst patients who may have compromised health should have delayed closure.

  4. RCRA, superfund and EPCRA hotline training module. Introduction to: Closure/post-closure (40 cfr parts 264/265, subpart g) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less

  5. [Evaluation of the external tissue extender (Ete) in secondary wound closure].

    PubMed

    Zutt, Markus; Beckmann, Iris; Kretschmer, Lutz

    2003-09-01

    For surgical closure of large skin defects, elaborate reconstructive plastic surgery or other methods such as internal subcutaneous balloon tissue expanders are required in order to avoid tension on the closure margins. Here we point to the benefits and disadvantages of an improved and simple method of secondary wound closure by secondary sutures. We employed a system called External Tissue Extender (ETE), which consists of silicone strings and plastic stoppers pulling the corresponding surgical sites together and evenly distributing the tension. Possible indications in dermatologic surgery and our experiences with this technique are outlined. Implantation and handling of the ETE are very easy and fast. The functional results are good and the cosmetic outcome satisfactory. More invasive surgical procedures can be avoided by using this method. A major disadvantage is the possibility of developing necrosis under the plastic stoppers. According to our experience, the ETE is a useful alternative indicated in certain dermatosurgical situations.

  6. 36 CFR 13.1242 - BCDA closures and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...

  7. 36 CFR 13.1242 - BCDA closures and restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...

  8. 36 CFR 13.1242 - BCDA closures and restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...

  9. 36 CFR 13.1242 - BCDA closures and restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...

  10. Crack closure, a literature study

    NASA Astrophysics Data System (ADS)

    Holmgren, M.

    1993-08-01

    In this report crack closure is treated. The state of the art is reviewed. Different empirical formulas for determining the crack closure are compared with each other, and their benefits are discussed. Experimental techniques for determining the crack closure stress are discussed, and some results from fatigue tests are also reported. Experimental data from the literature are reported.

  11. 40 CFR 146.71 - Closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Injection Wells § 146.71 Closure. (a) Closure Plan. The owner or operator of a Class I hazardous waste injection well shall prepare, maintain, and comply with a plan for closure of the well that meets... of material to be used in plugging; (iv) The method of placement of the plugs; (v) Any proposed test...

  12. Linearly exact parallel closures for slab geometry

    NASA Astrophysics Data System (ADS)

    Ji, Jeong-Young; Held, Eric D.; Jhang, Hogun

    2013-08-01

    Parallel closures are obtained by solving a linearized kinetic equation with a model collision operator using the Fourier transform method. The closures expressed in wave number space are exact for time-dependent linear problems to within the limits of the model collision operator. In the adiabatic, collisionless limit, an inverse Fourier transform is performed to obtain integral (nonlocal) parallel closures in real space; parallel heat flow and viscosity closures for density, temperature, and flow velocity equations replace Braginskii's parallel closure relations, and parallel flow velocity and heat flow closures for density and temperature equations replace Spitzer's parallel transport relations. It is verified that the closures reproduce the exact linear response function of Hammett and Perkins [Phys. Rev. Lett. 64, 3019 (1990)] for Landau damping given a temperature gradient. In contrast to their approximate closures where the vanishing viscosity coefficient numerically gives an exact response, our closures relate the heat flow and nonvanishing viscosity to temperature and flow velocity (gradients).

  13. 27 CFR 26.136 - Affixing closures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF THE TREASURY LIQUORS LIQUORS AND ARTICLES FROM PUERTO RICO AND THE VIRGIN ISLANDS Closures for Distilled Spirits From Puerto Rico § 26.136 Affixing closures. Closures or other devices shall be securely...

  14. 27 CFR 26.136 - Affixing closures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF THE TREASURY ALCOHOL LIQUORS AND ARTICLES FROM PUERTO RICO AND THE VIRGIN ISLANDS Closures for Distilled Spirits From Puerto Rico § 26.136 Affixing closures. Closures or other devices shall be securely...

  15. 27 CFR 26.136 - Affixing closures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF THE TREASURY LIQUORS LIQUORS AND ARTICLES FROM PUERTO RICO AND THE VIRGIN ISLANDS Closures for Distilled Spirits From Puerto Rico § 26.136 Affixing closures. Closures or other devices shall be securely...

  16. 27 CFR 26.136 - Affixing closures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF THE TREASURY ALCOHOL LIQUORS AND ARTICLES FROM PUERTO RICO AND THE VIRGIN ISLANDS Closures for Distilled Spirits From Puerto Rico § 26.136 Affixing closures. Closures or other devices shall be securely...

  17. 27 CFR 26.136 - Affixing closures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF THE TREASURY LIQUORS LIQUORS AND ARTICLES FROM PUERTO RICO AND THE VIRGIN ISLANDS Closures for Distilled Spirits From Puerto Rico § 26.136 Affixing closures. Closures or other devices shall be securely...

  18. System for closure of a physical anomaly

    DOEpatents

    Bearinger, Jane P; Maitland, Duncan J; Schumann, Daniel L; Wilson, Thomas S

    2014-11-11

    Systems for closure of a physical anomaly. Closure is accomplished by a closure body with an exterior surface. The exterior surface contacts the opening of the anomaly and closes the anomaly. The closure body has a primary shape for closing the anomaly and a secondary shape for being positioned in the physical anomaly. The closure body preferably comprises a shape memory polymer.

  19. Scalp Wound Closure with K wires: An alternative easier method to scalp wound closure.

    PubMed

    Ramesh, S; Ajik, S

    2012-12-01

    Scalp defects and lacerations present a reconstructive challenge to plastic surgeons. Many methods have been described from the use of skin grafting to rotation flaps. Here we present a method of closure of a contaminated scalp wound with the use of Kirschner wires. In our case, closure of scalp laceration was made possible with the use of 1.4 Kirschner wires and cable tie/ zip tie fasteners. The duration to closure of wound was 10 days. In reconstructing the scalp defect, this method was found to adhere to principles of scalp reconstruction. There were no post operative complications found from the procedure. On initial application on the edge of the wound, tension applied caused the K wires to cut through the wound edge. On replacement of K wires 1cm away from wound edge the procedure was not plagued by any further complication. In conclusion we find scalp closure with Kirschner wires are a simple and effective method for scalp wound closure.

  20. Addendum to the Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using

  1. Predictors of Premature Match Closure in Youth Mentoring Relationships.

    PubMed

    Kupersmidt, Janis B; Stump, Kathryn N; Stelter, Rebecca L; Rhodes, Jean E

    2017-03-01

    Although mentoring is a popular and effective means of intervention with youth, the positive effects of mentoring can be diminished by premature match closure of relationships. Program, mentor, and mentee characteristics were examined as predictors of premature match closure. Secondary data analyses were conducted on a large national database of mentoring programs consisting of match and youth risk information from 170 mentoring programs and 6468 matches from across the U.S. Premature closure was associated with mentee age at match inception and 19 individual mentee characteristics. The set of mentee characteristics were examined as part of a cumulative risk index encompassing seven conceptually combined categories including family background characteristics, school functioning problems, engagement in risky health behaviors, self-regulation difficulties, engagement in illegal or criminal activities, and internalizing and externalizing behavior problems. Both the age of mentees when matched and the cumulative risk index score significantly predicted premature closure. Results are discussed in terms of directions for future research and suggestions for enhancing mentoring program practices. © Society for Community Research and Action 2017.

  2. Automated Road Closure Gate

    DOT National Transportation Integrated Search

    2000-05-01

    This report presents the procedures involved in the research, design, construction, and testing of an Automated Road Closure Gate. The current road closure gates used in South Dakota are often unsafe and difficult to operate. This report will assist ...

  3. Empirical constraints on closure temperatures from a single diffusion coefficient

    NASA Astrophysics Data System (ADS)

    Lee, J. K. W.

    The elucidation of thermal histories by geochronological and isotopic means is based fundamentally on solid-state diffusion and the concept of closure temperatures. Because diffusion is thermally activated, an analytical solution of the closure temperature (Tc*) can only be obtained if the diffusion coefficient D of the diffusion process is measured at two or more different temperatures. If the diffusion coefficient is known at only one temperature, however, the true closure temperature (Tc*) cannot be calculated analytically because there exist an infinite number of possible (apparent) closure temperatures (Tc) which can be generated by this single datum. By introducing further empirical constraints to limit the range of possible closure temperatures, however, mathematical analysis of a modified form of the closure temperature equation shows that it is possible to make both qualitative and quantitative estimates of Tc* given knowledge of only one diffusion coefficient DM measured at one temperature TM. Qualitative constraints of the true closure temperature Tc* are obtained from the shapes of curves on a graph of the apparent Tc (Tc) vs. activation energy E, in which each curve is based on a single diffusion coefficient measurement DM at temperature TM. Using a realistic range of E, the concavity of the curve shows whether TM is less than, approximately equal to, or greater than Tc*. Quantitative estimates are obtained by considering two dimensionless parameters [lnÊRT^c vs. Tc*/TM] derived from these curves. When these parameters are plotted for known argon diffusion data and for a given diffusion size and cooling rate, it is found that the resultant curves are almost identical for all of the commonly dated K-Ar minerals - biotite, phlogopite, muscovite, hornblende and orthoclase - in spite of differences in their diffusion parameters. A common curve for Ar diffusion can be derived by least-squares fitting of all the Ar diffusion data and provides a way

  4. ROCKET PORT CLOSURE

    DOEpatents

    Mattingly, J.T.

    1963-02-12

    This invention provides a simple pressure-actuated closure whereby windowless observation ports are opened to the atmosphere at preselected altitudes. The closure comprises a disk which seals a windowless observation port in rocket hull. An evacuated instrument compartment is affixed to the rocket hull adjacent the inner surface of the disk, while the outer disk surface is exposed to the atmosphere through which the rocket is traveling. The pressure differential between the evacuated instrument compartment and the relatively high pressure external atmosphere forces the disk against the edge of the observation port, thereby effecting a tight seai. The instrument compartment is evacuated to a pressure equal to the atmospheric pressure existing at the altitude at which it is desiretl that the closure should open. When the rocket reaches this preselected altitude, the inwardly directed atmospheric force on the disk is just equaled by the residual air pressure force within the instrument compartment. Consequently, the closure disk falls away and uncovers the open observation port. The separation of the disk from the rocket hull actuates a switch which energizes the mechanism of a detecting instrument disposed within the instrument compartment. (AE C)

  5. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  6. Closure of patent foramen ovale versus medical therapy after cryptogenic stroke.

    PubMed

    Carroll, John D; Saver, Jeffrey L; Thaler, David E; Smalling, Richard W; Berry, Scott; MacDonald, Lee A; Marks, David S; Tirschwell, David L

    2013-03-21

    Whether closure of a patent foramen ovale is effective in the prevention of recurrent ischemic stroke in patients who have had a cryptogenic stroke is unknown. We conducted a trial to evaluate whether closure is superior to medical therapy alone in preventing recurrent ischemic stroke or early death in patients 18 to 60 years of age. In this prospective, multicenter, randomized, event-driven trial, we randomly assigned patients, in a 1:1 ratio, to medical therapy alone or closure of the patent foramen ovale. The primary results of the trial were analyzed when the target of 25 primary end-point events had been observed and adjudicated. We enrolled 980 patients (mean age, 45.9 years) at 69 sites. The medical-therapy group received one or more antiplatelet medications (74.8%) or warfarin (25.2%). Treatment exposure between the two groups was unequal (1375 patient-years in the closure group vs. 1184 patient-years in the medical-therapy group, P=0.009) owing to a higher dropout rate in the medical-therapy group. In the intention-to-treat cohort, 9 patients in the closure group and 16 in the medical-therapy group had a recurrence of stroke (hazard ratio with closure, 0.49; 95% confidence interval [CI], 0.22 to 1.11; P=0.08). The between-group difference in the rate of recurrent stroke was significant in the prespecified per-protocol cohort (6 events in the closure group vs. 14 events in the medical-therapy group; hazard ratio, 0.37; 95% CI, 0.14 to 0.96; P=0.03) and in the as-treated cohort (5 events vs. 16 events; hazard ratio, 0.27; 95% CI, 0.10 to 0.75; P=0.007). Serious adverse events occurred in 23.0% of the patients in the closure group and in 21.6% in the medical-therapy group (P=0.65). Procedure-related or device-related serious adverse events occurred in 21 of 499 patients in the closure group (4.2%), but the rate of atrial fibrillation or device thrombus was not increased. In the primary intention-to-treat analysis, there was no significant benefit associated

  7. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwestmore » of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate« less

  8. Effects of incision closure method on infection prevalence following tibial plateau leveling osteotomy in dogs

    PubMed Central

    Atwood, Chase; Maxwell, Mac; Butler, Ryan; Wills, Robert

    2015-01-01

    The goal of this study was to retrospectively investigate the effect of incisional closure with either stainless steel skin staples or intradermal poliglecaprone 25 on the prevalence of surgical site infection following tibial plateau leveling osteotomy in dogs. Medical records were reviewed for dogs treated with unilateral tibial plateau leveling osteotomy at Memphis Veterinary Specialists between 2006 and 2013. Procedures (n = 306) from 242 dogs were included in the study. The association of potential risk factors with the occurrence of postoperative infection was assessed using logistic regression. A value of P < 0.05 was considered significant. Weight and administration of postoperative antimicrobials were found to significantly influence surgical site infection prevalence. No significant association was noted between closure method and prevalence of postoperative infection. PMID:25829557

  9. FGFR3 promotes synchondrosis closure and fusion of ossification centers through the MAPK pathway

    PubMed Central

    Matsushita, Takehiko; Wilcox, William R.; Chan, Yuk Yu; Kawanami, Aya; Bükülmez, Hülya; Balmes, Gener; Krejci, Pavel; Mekikian, Pertchoui B.; Otani, Kazuyuki; Yamaura, Isakichi; Warman, Matthew L.; Givol, David; Murakami, Shunichi

    2009-01-01

    Activating mutations in FGFR3 cause achondroplasia and thanatophoric dysplasia, the most common human skeletal dysplasias. In these disorders, spinal canal and foramen magnum stenosis can cause serious neurologic complications. Here, we provide evidence that FGFR3 and MAPK signaling in chondrocytes promote synchondrosis closure and fusion of ossification centers. We observed premature synchondrosis closure in the spine and cranial base in human cases of homozygous achondroplasia and thanatophoric dysplasia as well as in mouse models of achondroplasia. In both species, premature synchondrosis closure was associated with increased bone formation. Chondrocyte-specific activation of Fgfr3 in mice induced premature synchondrosis closure and enhanced osteoblast differentiation around synchondroses. FGF signaling in chondrocytes increases Bmp ligand mRNA expression and decreases Bmp antagonist mRNA expression in a MAPK-dependent manner, suggesting a role for Bmp signaling in the increased bone formation. The enhanced bone formation would accelerate the fusion of ossification centers and limit the endochondral bone growth. Spinal canal and foramen magnum stenosis in heterozygous achondroplasia patients, therefore, may occur through premature synchondrosis closure. If this is the case, then any growth-promoting treatment for these complications of achondroplasia must precede the timing of the synchondrosis closure. PMID:18923003

  10. Direct Percutaneous Left Ventricular Access and Port Closure

    PubMed Central

    Barbash, Israel M.; Saikus, Christina E.; Faranesh, Anthony Z.; Ratnayaka, Kanishka; Kocaturk, Ozgur; Chen, Marcus Y.; Bell, Jamie A.; Virmani, Renu; Schenke, William H.; Hansen, Michael S.; Slack, Michael C.; Lederman, Robert J.

    2012-01-01

    Objectives This study sought to evaluate feasibility of nonsurgical transthoracic catheter-based left ventricular (LV) access and closure. Background Implanting large devices, such as mitral or aortic valve prostheses, into the heart requires surgical exposure and repair. Reliable percutaneous direct transthoracic LV access and closure would allow new nonsurgical therapeutic procedures. Methods Percutaneous direct LV access was performed in 19 swine using real-time magnetic resonance imaging (MRI) and an “active” MRI needle antenna to deliver an 18-F introducer sheath. The LV access ports were closed percutaneously using a commercial ventricular septal defect occluder and an “active” MRI delivery cable for enhanced visibility. We used “permissive pericardial tamponade” (temporary fluid instillation to separate the 2 pericardial layers) to avoid pericardial entrapment by the epicardial disk. Techniques were developed in 8 animals, and 11 more were followed up to 3 months by MRI and histopathology. Results Imaging guidance allowed 18-F sheath access and closure with appropriate positioning of the occluder inside the transmyocardial tunnel. Of the survival cohort, immediate hemostasis was achieved in 8 of 11 patients. Failure modes included pericardial entrapment by the epicardial occluder disk (n = 2) and a true-apex entry site that prevented hemostatic apposition of the endocardial disk (n = 1). Reactive pericardial effusion (192 ± 118 ml) accumulated 5 ± 1 days after the procedure, requiring 1-time drainage. At 3 months, LV function was preserved, and the device was endothelialized. Conclusions Direct percutaneous LV access and closure is feasible using real-time MRI. A commercial occluder achieved hemostasis without evident deleterious effects on the LV. Having established the concept, further clinical development of this approach appears realistic. PMID:22192372

  11. Developing a strategy and closure criteria for radioactive and mixed waste sites in the ORNL remedial action program: Regulatory interface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.

    1987-09-01

    Some options for stabilization and treatment of contaminated sites can theoretically provide a once-and-for-all solution (e.g., removal or destruction of contaminants). Most realizable options, however, leave contaminants in place (in situ), potentially isolated by physical or chemical, but more typically, by hydrologic measures. As a result of the dynamic nature of the interactions between contaminants, remedial measures, and the environment, in situ stablization measures are likely to have limited life spans, and maintenance and monitoring of performance become an essential part of the scheme. The length of formal institutional control over the site and related questions about future uses ofmore » the land and waters are of paramount importance. Unique features of the ORNL site and environs appear to be key ingredients in achieving the very long term institutional control necessary for successful financing and implementation of in situ stabilization. Some formal regulatory interface is necessary to ensure that regulatory limitations and new guidance which can affect planning and implementation of the ORNL Remedial Action Program are communicated to ORNL staff and potential technical and financial limitations which can affect schedules or alternatives for achievement of long-term site stabilization and the capability to meet environmental regulations are provided to regulatory bodies as early as possible. Such an interface should allow decisions on closure criteria to be based primarily on technical merit and protection of human health and the environment. A plan for interfacing with federal and state regulatory authorities is described. 93 refs., 1 fig., 4 tabs.« less

  12. Angle closure in younger patients.

    PubMed Central

    Chang, Brian M; Liebmann, Jeffrey M; Ritch, Robert

    2002-01-01

    PURPOSE: Angle-closure glaucoma is rare in children and young adults. Only scattered cases associated with specific clinical entities have been reported. We evaluated the findings in patients in our database aged 40 or younger with angle closure. METHODS: Our database was searched for patients with angle closure who were 40 years old or younger. Data recorded included age at initial consultation; age at the time of diagnosis; gender; results of slit-lamp examination, gonioscopy, and ultrasound biomicroscopy (from 1993 onward); clinical diagnosis; and therapy. Patients with previous incisional surgery were excluded, as were patients with anterior chamber proliferative mechanisms leading to angle closure. RESULTS: Sixty-seven patients (49 females, 18 males) met entry criteria. Mean age (+/- SD) at the time of consultation was 34.4 +/- 9.4 years (range, 3-68 years). Diagnoses included plateau iris syndrome (35 patients), iridociliary cysts (8 patients), retinopathy of prematurity (7 patients), uveitis (5 patients), isolated nanophthalmos (3 patients), relative pupillary block (2 patients), Weill-Marchesani syndrome (3 patients), and 1 patient each with Marfan syndrome, miotic-induced angle closure, persistent hyperplastic primary vitreous, and idiopathic lens subluxation. CONCLUSION: The etiology of angle closure in young persons is different from that in the older population and is typically associated with structural or developmental ocular anomalies rather than relative pupillary block. Following laser iridotomy, these eyes should be monitored for recurrent angle closure and the need for additional laser or incisional surgical intervention. PMID:12545694

  13. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  14. Economic comparison of methods of wound closure: wound closure strips vs. sutures and wound adhesives.

    PubMed

    Zempsky, William T; Zehrer, Cindy L; Lyle, Christopher T; Hedbloom, Edwin C

    2005-09-01

    Our objective was to review and assess the treatment of low-tension wounds and evaluate the cost-effectiveness of wound closure methods. We used a health economic model to estimate cost/closure of adhesive wound closure strips, tissue adhesives and sutures. The model incorporated cost-driving variables: application time, costs and the likelihood and costs of dehiscence and infection. The model was populated with variable estimates derived from the literature. Cost estimates and cosmetic results were compared. Parameter values were estimated using national healthcare and labour statistics. Sensitivity analyses were used to verify the results. Our analysis suggests that adhesive wound closure strips had the lowest average cost per laceration ($7.54), the lowest cost per infected laceration ($53.40) and the lowest cost per laceration with dehiscence ($25.40). The costs for sutures were $24.11, $69.91 and $41.91, respectively; the costs for tissue adhesives were $28.77, $74.68 and $46.68, respectively. The cosmetic outcome for all three treatments was equivalent. We conclude adhesive wound closure strips were both a cost-saving and a cost-effective alternative to sutures and tissue adhesives in the closure of low-tension lacerations.

  15. Closedure - Mine Closure Technologies Resource

    NASA Astrophysics Data System (ADS)

    Kauppila, Päivi; Kauppila, Tommi; Pasanen, Antti; Backnäs, Soile; Liisa Räisänen, Marja; Turunen, Kaisa; Karlsson, Teemu; Solismaa, Lauri; Hentinen, Kimmo

    2015-04-01

    Closure of mining operations is an essential part of the development of eco-efficient mining and the Green Mining concept in Finland to reduce the environmental footprint of mining. Closedure is a 2-year joint research project between Geological Survey of Finland and Technical Research Centre of Finland that aims at developing accessible tools and resources for planning, executing and monitoring mine closure. The main outcome of the Closedure project is an updatable wiki technology-based internet platform (http://mineclosure.gtk.fi) in which comprehensive guidance on the mine closure is provided and main methods and technologies related to mine closure are evaluated. Closedure also provides new data on the key issues of mine closure, such as performance of passive water treatment in Finland, applicability of test methods for evaluating cover structures for mining wastes, prediction of water effluents from mine wastes, and isotopic and geophysical methods to recognize contaminant transport paths in crystalline bedrock.

  16. Long-term outcomes of sandwich ventral hernia repair paired with hybrid vacuum-assisted closure.

    PubMed

    Hicks, Caitlin W; Poruk, Katherine E; Baltodano, Pablo A; Soares, Kevin C; Azoury, Said C; Cooney, Carisa M; Cornell, Peter; Eckhauser, Frederic E

    2016-08-01

    Sandwich ventral hernia repair (SVHR) may reduce ventral hernia recurrence rates, although with an increased risk of surgical site occurrences (SSOs) and surgical site infections (SSIs). Previously, we found that a modified negative pressure wound therapy (hybrid vacuum-assisted closure [HVAC]) system reduced SSOs and SSIs after ventral hernia repair. We aimed to describe our outcomes after SVHR paired with HVAC closure. We conducted a 4-y retrospective review of all complex SVHRs (biologic mesh underlay and synthetic mesh overlay) with HVAC closure performed at our institution by a single surgeon. All patients had fascial defects that could not be reapproximated primarily using anterior component separation. Descriptive statistics were used to report the incidence of postoperative complications and hernia recurrence. A total of 60 patients (59.3 ± 11.4 y, 58.3% male, 75% American Society of Anesthesiologists class ≥3) with complex ventral hernias being underwent sandwich repair with HVAC closure. Major postoperative morbidity (Dindo-Clavien class ≥3) occurred in 14 (23.3%) patients, but incidence of SSO (n = 13, 21.7%) and SSI (n = 4, 6.7%) was low compared with historical reports. Median follow-up time for all patients was 12 mo (interquartile range 5.8-26.5 mo). Hernia recurrence occurred in eight patients (13.3%) after a median time of 20.6 months (interquartile range 16.4- 25.4 months). Use of a dual layer sandwich repair for complex abdominal wall reconstruction is associated with low rates of hernia recurrence at 1 year postoperatively. The addition of the HVAC closure system may reduce the risk of SSOs and SSIs previously reported with this technique and deserves consideration in future prospective studies assessing optimization of ventral hernia repair approaches. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Multivariate moment closure techniques for stochastic kinetic models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lakatos, Eszter, E-mail: e.lakatos13@imperial.ac.uk; Ale, Angelique; Kirk, Paul D. W.

    2015-09-07

    Stochastic effects dominate many chemical and biochemical processes. Their analysis, however, can be computationally prohibitively expensive and a range of approximation schemes have been proposed to lighten the computational burden. These, notably the increasingly popular linear noise approximation and the more general moment expansion methods, perform well for many dynamical regimes, especially linear systems. At higher levels of nonlinearity, it comes to an interplay between the nonlinearities and the stochastic dynamics, which is much harder to capture correctly by such approximations to the true stochastic processes. Moment-closure approaches promise to address this problem by capturing higher-order terms of the temporallymore » evolving probability distribution. Here, we develop a set of multivariate moment-closures that allows us to describe the stochastic dynamics of nonlinear systems. Multivariate closure captures the way that correlations between different molecular species, induced by the reaction dynamics, interact with stochastic effects. We use multivariate Gaussian, gamma, and lognormal closure and illustrate their use in the context of two models that have proved challenging to the previous attempts at approximating stochastic dynamics: oscillations in p53 and Hes1. In addition, we consider a larger system, Erk-mediated mitogen-activated protein kinases signalling, where conventional stochastic simulation approaches incur unacceptably high computational costs.« less

  18. Ecological Data in Support of the Tank Closure and Waste Management Environmental Impact Statement. Part 2: Results of Spring 2007 Field Surveys

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sackschewsky, Michael R.; Downs, Janelle L.

    2007-05-31

    This review provides an evaluation of potential impacts of actions that have been proposed under various alternatives to support the closure of the high level waste tanks on the Hanford Site. This review provides a summary of data collected in the field during the spring of 2007 at all of the proposed project sites within 200 East and 200 West Areas, and at sites not previously surveyed. The primary purpose of this review is to provide biological data that can be incorporated into or used to support the Tank Closure and Waste Management Environmental Impact Statement.

  19. CPT-hole closure

    USGS Publications Warehouse

    Noce, T.E.; Holzer, T.L.

    2003-01-01

    The long-term stability of deep holes 1.75 inches. (4.4 cm) in diameter by 98.4 feet (30 m) created by cone penetration testing (CPT) was monitored at a site in California underlain by Holocene and Pleistocene age alluvial fan deposits. Portions of the holes remained open both below and above the 28.6-foot (8.7 m)-deep water table for approximately three years, when the experiment was terminated. Hole closure appears to be a very slow process that may take decades in the stiff soils studied here. Other experience suggests holes in softer soils may also remain open. Thus, despite their small diameter, CPT holes may remain open for years and provide paths for rapid migration of contaminants. The observations confirm the need to grout holes created by CPT soundings as well as other direct-push techniques in areas where protection of shallow ground water is important.

  20. Relaxing the closure assumption in single-season occupancy models: staggered arrival and departure times

    USGS Publications Warehouse

    Kendall, William L.; Hines, James E.; Nichols, James D.; Grant, Evan H. Campbell

    2013-01-01

    Occupancy statistical models that account for imperfect detection have proved very useful in several areas of ecology, including species distribution and spatial dynamics, disease ecology, and ecological responses to climate change. These models are based on the collection of multiple samples at each of a number of sites within a given season, during which it is assumed the species is either absent or present and available for detection while each sample is taken. However, for some species, individuals are only present or available for detection seasonally. We present a statistical model that relaxes the closure assumption within a season by permitting staggered entry and exit times for the species of interest at each site. Based on simulation, our open model eliminates bias in occupancy estimators and in some cases increases precision. The power to detect the violation of closure is high if detection probability is reasonably high. In addition to providing more robust estimation of occupancy, this model permits comparison of phenology across sites, species, or years, by modeling variation in arrival or departure probabilities. In a comparison of four species of amphibians in Maryland we found that two toad species arrived at breeding sites later in the season than a salamander and frog species, and departed from sites earlier.

  1. 100-D Ponds closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less

  2. 40 CFR 265.404 - Closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Physical, and Biological Treatment § 265.404 Closure. At closure, all hazardous waste and hazardous waste residues must be removed from treatment processes or equipment, discharge control equipment, and discharge...

  3. 40 CFR 265.404 - Closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Physical, and Biological Treatment § 265.404 Closure. At closure, all hazardous waste and hazardous waste residues must be removed from treatment processes or equipment, discharge control equipment, and discharge...

  4. 40 CFR 265.404 - Closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Physical, and Biological Treatment § 265.404 Closure. At closure, all hazardous waste and hazardous waste residues must be removed from treatment processes or equipment, discharge control equipment, and discharge...

  5. 40 CFR 265.404 - Closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Physical, and Biological Treatment § 265.404 Closure. At closure, all hazardous waste and hazardous waste residues must be removed from treatment processes or equipment, discharge control equipment, and discharge...

  6. 40 CFR 265.404 - Closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Physical, and Biological Treatment § 265.404 Closure. At closure, all hazardous waste and hazardous waste residues must be removed from treatment processes or equipment, discharge control equipment, and discharge...

  7. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs

  8. A mutation in the tuft mouse disrupts TET1 activity and alters the expression of genes that are crucial for neural tube closure.

    PubMed

    Fong, Keith S K; Hufnagel, Robert B; Khadka, Vedbar S; Corley, Michael J; Maunakea, Alika K; Fogelgren, Ben; Ahmed, Zubair M; Lozanoff, Scott

    2016-05-01

    Genetic variations affecting neural tube closure along the head result in malformations of the face and brain. Neural tube defects (NTDs) are among the most common birth defects in humans. We previously reported a mouse mutant called tuft that arose spontaneously in our wild-type 3H1 colony. Adult tuft mice present midline craniofacial malformations with or without an anterior cephalocele. In addition, affected embryos presented neural tube closure defects resulting in insufficient closure of the anterior neuropore or exencephaly. Here, through whole-genome sequencing, we identified a nonsense mutation in the Tet1 gene, which encodes a methylcytosine dioxygenase (TET1), co-segregating with the tuft phenotype. This mutation resulted in premature termination that disrupts the catalytic domain that is involved in the demethylation of cytosine. We detected a significant loss of TET enzyme activity in the heads of tuft embryos that were homozygous for the mutation and had NTDs. RNA-Seq transcriptome analysis indicated that multiple gene pathways associated with neural tube closure were dysregulated in tuft embryo heads. Among them, the expressions of Cecr2, Epha7 and Grhl2 were significantly reduced in some embryos presenting neural tube closure defects, whereas one or more components of the non-canonical WNT signaling pathway mediating planar cell polarity and convergent extension were affected in others. We further show that the recombinant mutant TET1 protein was capable of entering the nucleus and affected the expression of endogenous Grhl2 in IMCD-3 (inner medullary collecting duct) cells. These results indicate that TET1 is an epigenetic determinant for regulating genes that are crucial to closure of the anterior neural tube and its mutation has implications to craniofacial development, as presented by the tuft mouse. © 2016. Published by The Company of Biologists Ltd.

  9. RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.

    DTIC Science & Technology

    1989-05-01

    20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION

  10. Dissecting the active site of a photoreceptor protein

    NASA Astrophysics Data System (ADS)

    Hoff, Wouter; Hara, Miwa; Ren, Jie; Moghadam, Farzaneh; Xie, Aihua; Kumauchi, Masato

    While enzymes are quite large molecules, functionally important chemical events are often limited to a small region of the protein: the active site. The physical and chemical properties of residues at such active sites are often strongly altered compared to the same groups dissolved in water. Understanding such effects is important for unraveling the mechanisms underlying protein function and for protein engineering, but has proven challenging. Here we report on our ongoing efforts on using photoactive yellow protein (PYP), a bacterial photoreceptor, as a model system for such effects. We will report on the following questions: How many residues affect active site properties? Are these residues in direct physical contact with the active site? Can functionally important residues be recognized in the crystal structure of a protein? What structural resolution is needed to understand active sites? What spectroscopic techniques are most informative? Which weak interactions dominate active site properties?

  11. A Randomized, Controlled Study Comparing Two Standardized Closure Methods of Laparoscopic Port Sites

    PubMed Central

    Chen, Kai; Klapper, Allan S.; Voige, Hayley

    2010-01-01

    Objectives: To compare octyl-cyanoacrylate tissue adhesive (OCT) with the standard suture technique for the closure of laparoscopic port sites. Methods: This was a randomized clinical trial of 40 patients. All participants had 2 lower abdominal ports, with one port closed using OCT while the opposite port was closed with 4-0 monocryl suture. An evaluation of the wound was performed 2 weeks to 4 weeks after surgery. The Hollander Wound Evaluation Scale (HWES, including step-off of borders, contour irregularities, margin separation, edge inversion, excessive distortion, and overall appearance) was used for cosmetic evaluation. Complications, such as erythema, warmth, tenderness, drainage, and wound infection, were evaluated. Analysis of complications was performed using the chi-square test, and cosmetic evaluation including individual components of the HWES was compared with the t test, P<0.05 considered significant. Results: Eighty wounds were evaluated in 40 patients. The number of patients with complications including erythema (1/40 vs. 16/40), tenderness (1/40 vs. 19/40), and drainage (1/40 vs. 9/40) was lower with OCT than with sutures, respectively (all P<0.001). The ports closed with OCT had higher overall HWES, ie, better cosmetic score (5.92±0.05 vs 5.50±0.13) and lower margin separation (1/40 vs. 10/40) but had higher contour irregularity (6/40 vs. 1/40) (all P<0.05). However, skin contour irregularity was significantly better when OCT was applied using fine tissue forceps (P=0.002). Conclusion: Laparoscopic ports closed with OCT had fewer early complications, such as wound erythema, tenderness, and drainage. Ports closed with OCT had a better cosmetic appearance. PMID:21333194

  12. Pressure-tight closure for thermoelements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1937-06-14

    The thermoelements were arranged in a pressure-tight housing for measuring temperatures on the inside of high-pressure hydrogenation equipment. Should the housing ever leak due to failure of the material or the grinding action of the high sand content of the coal paste, the stall was liable to be set on fire. If, in an installation protected in this manner, an element housing should leak, the pressure tight closure at one end of the housing prevented an escape of the gas and product and the stall could continue to run without danger. The final form of this closure was discussed inmore » detail in this report. In the development of this closure, particular value was attached to a compact construction. In the sealing for a 30-mm high pressure tube, four steel and four constantan wires were insulated and arranged pressure-tight. Each of the three fillers had a different purpose. The hard-rubber insert took the surface pressure, the rubber stopper provided a seal and the cast gypsum provided protection against heat should hot gas or product reach the closure in case of a leaky housing. Two drawings were given showing the thermoelement-closure, and the final form of the closure. The report discussed methods of evacuating from the thermohousings any accumulations of condensed water, which could damage insulation, or hydrogen, which continually diffused in small amounts during operation and which could attack the iron elements of the thermocouples. The pressure-tight closures for thermoelements had been successful at preventing fires due to leakage for more than nine months of operation. 2 sketches.« less

  13. Land use-based landscape planning and restoration in mine closure areas.

    PubMed

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  14. Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluatedmore » to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).« less

  15. Design and rationale of the AngioSeal versus the Radial approach In acute coronary SyndromE (ARISE) trial: a randomized comparison of a vascular closure device versus the radial approach to prevent vascular access site complications in non-ST-segment elevation acute coronary syndrome patients.

    PubMed

    de Andrade, Pedro Beraldo; E Mattos, Luiz Alberto Piva; Tebet, Marden André; Rinaldi, Fábio Salerno; Esteves, Vinícius Cardozo; Nogueira, Ederlon Ferreira; França, João Ítalo Dias; de Andrade, Mônica Vieira Athanazio; Barbosa, Robson Alves; Labrunie, André; Abizaid, Alexandre Antônio Cunha; Sousa, Amanda Guerra de Moraes Rego

    2013-12-18

    Arterial access is a major site of bleeding complications after invasive coronary procedures. Among strategies to decrease vascular complications, the radial approach is an established one. Vascular closure devices provide more comfort to patients and decrease hemostasis and need for bed rest. However, the inconsistency of data proving their safety limits their routine adoption as a strategy to prevent vascular complications, requiring evidence through adequately designed randomized trials. The aim of this study is to compare the radial versus femoral approach using a vascular closure device for the incidence of arterial puncture site vascular complications among non-ST-segment elevation acute coronary syndrome patients submitted to an early invasive strategy. ARISE is a national, multicenter, non-inferiority randomized clinical trial. Two hundred patients with non-ST-segment elevation acute coronary syndrome will be randomized to either radial or femoral access using a vascular closure device. The primary outcome is the occurrence of vascular complications at an arterial puncture site 30 days after the procedure, including major bleeding, retroperitoneal hematoma, compartment syndrome, hematoma ≥ 5 cm, pseudoaneurysm, arterio-venous fistula, infection, limb ischemia, arterial occlusion, adjacent nerve injury or the need for vascular surgical repair. Enrollment was initiated in September 2012, and until October 2013 91 patients were included. The inclusion phase is expected to last until the second half of 2014. The ARISE trial will help define the role of a vascular closure device as a bleeding avoidance strategy in patients with NSTEACS. ClinicalTrials.gov identifier: NCT01653587.

  16. VR closure rates for two vocational models.

    PubMed

    Fraser, Virginia V; Jones, Amanda M; Frounfelker, Rochelle; Harding, Brian; Hardin, Teresa; Bond, Gary R

    2008-01-01

    The Individual Placement and Support (IPS) model of supported employment is an evidence-based practice for individuals with psychiatric disabilities. To be financially viable, IPS programs require funding from the state-federal vocational rehabilitation (VR) system. However, some observers have questioned the compatibility of IPS and the VR system. Using a randomized controlled trial comparing IPS to a well-established vocational program called the Diversified Placement Approach (DPA), we examined rates of VR sponsorship and successful VR closures. We also describe the establishment of an active collaboration between a psychiatric rehabilitation agency and the state VR system to facilitate rapid VR sponsorship for IPS clients. Both IPS and DPA achieved a 44% rate of VR Status 26 closure when considering all clients entering the study. IPS and DPA averaged similar amount of time to achieve VR sponsorship. Time from vocational program entry to Status 26 was 51 days longer on average for IPS. Even though several IPS principles seem to run counter to VR practices, such as zero exclusion and rapid job search, we found IPS closure rates comparable to those for DPA, a vocational model that screens for readiness, provides prevocational preparation, and extensively uses agency-run businesses.

  17. 50 CFR 648.161 - Closures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Bluefish Fishery § 648.161 Closures. (a) EEZ closure. NMFS shall close the EEZ to fishing for bluefish by... dealer permit holders that no commercial quota is available for landing bluefish in that state. ...

  18. Active site dynamics of ribonuclease.

    PubMed Central

    Brünger, A T; Brooks, C L; Karplus, M

    1985-01-01

    The stochastic boundary molecular dynamics method is used to study the structure, dynamics, and energetics of the solvated active site of bovine pancreatic ribonuclease A. Simulations of the native enzyme and of the enzyme complexed with the dinucleotide substrate CpA and the transition-state analog uridine vanadate are compared. Structural features and dynamical couplings for ribonuclease residues found in the simulation are consistent with experimental data. Water molecules, most of which are not observed in crystallographic studies, are shown to play an important role in the active site. Hydrogen bonding of residues with water molecules in the free enzyme is found to mimic the substrate-enzyme interactions of residues involved in binding. Networks of water stabilize the cluster of positively charged active site residues. Correlated fluctuations between the uridine vanadate complex and the distant lysine residues are mediated through water and may indicate a possible role for these residues in stabilizing the transition state. Images PMID:3866234

  19. Health Risks to Ecological Workers on Contaminated Sites - the Department of Energy as a Case Study

    PubMed Central

    Burger, Joanna; Gochfeld, Michael

    2016-01-01

    Background At most contaminated sites the risk to workers focuses on those ‘hazardous waste workers’ directly exposed to chemicals or radionuclides, and to the elaborate approaches implemented to protecting their health and safety. Ecological workers generally are not considered. Objectives To explore the risks to the health and safety of ecological workers on sites with potential chemical and radiological exposures before, during or after remediation of contamination. To use the U.S. Department of Energy as a case study, and to develop concepts that apply generally to sites contaminated with hazardous or nuclear wastes, Methods Develop categories of ecological workers, describe their usual jobs, and provide information on the kinds of risks they face. Ecological activities include continued surveillance and monitoring work on any sites with residual contamination, subject to institutional controls and engineered barriers following closure as well as the restoration. Results The categories of ecological workers and their tasks include 1) Ecological characterization, mapping and monitoring, 2) biodiversity studies, 2) Contaminant fate and transport, 3) On-going industrial activities 4) Remediation activities (environmental management), 5) Environmental restoration, 6) Post-cleanup surveillance and monitoring, and 7) Post-closure future site activities. There are a set of functional activities that can occur with different frequencies and intensities, including visual inspection, collecting biological samples, collecting media physical samples, collecting biological debris, restoration planting, and maintaining ecosystems. Conclusions Ecological workers face different exposures and risks than other environmental cleanup workers. Many of their tasks mimic shift work with long hours leading to fatigue, and they are exposed to biological as well as chemical/radiological hazards. DOE and other entities need to examine the risks to ecological workers on site with an

  20. Endoscopic closure of duodenal perforations by using an over-the-scope clip: a randomized, controlled porcine study.

    PubMed

    von Renteln, Daniel; Rudolph, Hans-Ulrich; Schmidt, Arthur; Vassiliou, Melina C; Caca, Karel

    2010-01-01

    Duodenal perforations during diagnostic upper endoscopy are rare; however, when therapeutic techniques are performed, the reported incidence is as great as 2.8%. Surgical repair is usually mandated, but it is associated with significant morbidity and mortality. To compare closure of duodenal perforations by using an over-the-scope clip (OTSC) with a surgical closure. Randomized, controlled animal study. Animal facility laboratory. Domestic pigs (24 females). Large (10-mm) duodenal perforations were created by using an endoscopic needle-knife. The animals were randomly assigned to either open surgical repair (n=12) or endoscopic closure by using the OTSC system (n=12). Pressurized leak tests were performed during necropsy. One major bleed occurred because of a liver injury during creation of the duodenotomy. Mean time for endoscopic closure was 5 minutes (range, 3-8 min; SD +/- 2). No complications occurred during any of the closure procedures. At necropsy, all OTSC and surgical closures demonstrated complete sealing of duodenotomy sites. Pressurized leak tests demonstrated a mean burst pressure of 166 mm Hg (range, 80-260; SD +/- 65) for OTSC closures and 143 mm Hg (range, 30-300, SD +/- 83) for surgical sutures. Ex vivo intact duodenal specimens exhibited a mean burst pressure of 247 mm Hg (range, 200-300; SD +/- 35), which was significantly higher compared with in vivo OTSC and surgical closures (P < .01). There were no significant differences between burst pressures of OTSC and surgical closures (P = .461). Nonsurvival setting. Endoscopic closure of duodenal perforations by using the OTSC system is comparable with surgical closure in a nonsurvival porcine model. This technique is easy to perform and seems suitable for repairing duodenal perforations. 2010 American Society for Gastrointestinal Endoscopy. Published by Mosby, Inc. All rights reserved.

  1. Knowing Where You're Going: Planning for Meaningful Course Closure

    ERIC Educational Resources Information Center

    Burgess-Van Aken, Barbara

    2017-01-01

    A literature review on approaches to a final course session reveals a dearth of attention to the issue. Options for last-day activities fall into three categories: professor-centered, activity-focused, and student-driven. Using the criterion that meaningful course closure calls for last-day activities that engage students in reflection not only…

  2. Echocardiographic predictors of coil vs device closure in patients undergoing percutaneous patent ductus arteriosus closure.

    PubMed

    Roushdy, Alaa; Abd El Razek, Yasmeen; Mamdouh Tawfik, Ahmed

    2018-01-01

    To determine anatomic and hemodynamic echocardiographic predictors for patent ductus arteriosus (PDA) device vs coil closure. Seventy-six patients who were referred for elective transcatheter PDA closure were enrolled in the study. All patients underwent full echocardiogram including measurement of the PDA pulmonary end diameter, color flow width and extent, peak and end-diastolic Doppler gradients across the duct, diastolic flow reversal, left atrial dimensions and volume, left ventricular sphericity index, and volumes. The study group was subdivided into 2 subgroups based on the mode of PDA closure whether by coil (n = 42) or device (n = 34). Using univariate analysis there was a highly significant difference between the 2 groups as regard the pulmonary end diameter measured in both the suprasternal and parasternal short-axis views as well as the color flow width and color flow extent (P < .0001). The device closure group had statistically significant higher end-systolic and end-diastolic volumes indexed, left atrial volume, and diastolic flow reversal. Receiver operating characteristic curve analysis showed a pulmonary end diameter cutoff point from the suprasternal view > 2.5 mm and from parasternal short-axis view > 2.61 mm to have the highest balanced sensitivity and specificity to predict the likelihood for device closure (AUC 0.971 and 0.979 respectively). The pulmonary end diameter measured from the suprasternal view was the most independent predictor of device closure. The selection between PDA coil or device closure can be done on the basis of multiple anatomic and hemodynamic echocardiographic variables. © 2017 Wiley Periodicals, Inc.

  3. Low dielectric response in enzyme active site

    PubMed Central

    Mertz, Edward L.; Krishtalik, Lev I.

    2000-01-01

    The kinetics of charge transfer depend crucially on the dielectric reorganization of the medium. In enzymatic reactions that involve charge transfer, atomic dielectric response of the active site and of its surroundings determines the efficiency of the protein as a catalyst. We report direct spectroscopic measurements of the reorganization energy associated with the dielectric response in the active site of α-chymotrypsin. A chromophoric inhibitor of the enzyme is used as a spectroscopic probe. We find that water strongly affects the dielectric reorganization in the active site of the enzyme in solution. The reorganization energy of the protein matrix in the vicinity of the active site is similar to that of low-polarity solvents. Surprisingly, water exhibits an anomalously high dielectric response that cannot be described in terms of the dielectric continuum theory. As a result, sequestering the active site from the aqueous environment inside low-dielectric enzyme body dramatically reduces the dielectric reorganization. This reduction is particularly important for controlling the rate of enzymatic reactions. PMID:10681440

  4. Mitigation of infectious disease at school: targeted class closure vs school closure.

    PubMed

    Gemmetto, Valerio; Barrat, Alain; Cattuto, Ciro

    2014-12-31

    School environments are thought to play an important role in the community spread of infectious diseases such as influenza because of the high mixing rates of school children. The closure of schools has therefore been proposed as an efficient mitigation strategy. Such measures come however with high associated social and economic costs, making alternative, less disruptive interventions highly desirable. The recent availability of high-resolution contact network data from school environments provides an opportunity to design models of micro-interventions and compare the outcomes of alternative mitigation measures. We model mitigation measures that involve the targeted closure of school classes or grades based on readily available information such as the number of symptomatic infectious children in a class. We focus on the specific case of a primary school for which we have high-resolution data on the close-range interactions of children and teachers. We simulate the spread of an influenza-like illness in this population by using an SEIR model with asymptomatics, and compare the outcomes of different mitigation strategies. We find that targeted class closure affords strong mitigation effects: closing a class for a fixed period of time--equal to the sum of the average infectious and latent durations--whenever two infectious individuals are detected in that class decreases the attack rate by almost 70% and significantly decreases the probability of a severe outbreak. The closure of all classes of the same grade mitigates the spread almost as much as closing the whole school. Our model of targeted class closure strategies based on readily available information on symptomatic subjects and on limited information on mixing patterns, such as the grade structure of the school, shows that these strategies might be almost as effective as whole-school closure, at a much lower cost. This may inform public health policies for the management and mitigation of influenza

  5. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Undrground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in

  6. Full road closure for work zone operations, a cross-cutting study : reducing congestion and crashes through full road closure for maintenance and construction.

    DOT National Transportation Integrated Search

    2003-08-01

    The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...

  7. The end of the asylum (town): community responses to the depopulation and closure of the Saskatchewan Hospital, Weyburn.

    PubMed

    Dooley, Chris

    2011-01-01

    Never is the fraught relationship between the state-run custodial mental hospital and its host community clearer than during the period of rapid deinstitutionalization, when communities, facing the closure of their mental health facilities, inserted themselves into debates about the proper configuration of the mental health care system. Using the case of Weyburn, Saskatchewan, site in the 1960s of one of Canada's earliest and most radical experiments in rapid institutional depopulation, this article explores the government of Saskatchewan's management of the conflict between the latent functions of the old-line mental hospital as a community institution, an employer, and a generator of economic activity with its manifest function as a site of care made obsolete by the shift to community models of care.

  8. Methanopyrus kandleri topoisomerase V contains three distinct AP lyase active sites in addition to the topoisomerase active site

    PubMed Central

    Rajan, Rakhi; Osterman, Amy; Mondragón, Alfonso

    2016-01-01

    Topoisomerase V (Topo-V) is the only topoisomerase with both topoisomerase and DNA repair activities. The topoisomerase activity is conferred by a small alpha-helical domain, whereas the AP lyase activity is found in a region formed by 12 tandem helix-hairpin-helix ((HhH)2) domains. Although it was known that Topo-V has multiple repair sites, only one had been mapped. Here, we show that Topo-V has three AP lyase sites. The atomic structure and Small Angle X-ray Scattering studies of a 97 kDa fragment spanning the topoisomerase and 10 (HhH)2 domains reveal that the (HhH)2 domains extend away from the topoisomerase domain. A combination of biochemical and structural observations allow the mapping of the second repair site to the junction of the 9th and 10th (HhH)2 domains. The second site is structurally similar to the first one and to the sites found in other AP lyases. The 3rd AP lyase site is located in the 12th (HhH)2 domain. The results show that Topo-V is an unusual protein: it is the only known protein with more than one (HhH)2 domain, the only known topoisomerase with dual activities and is also unique by having three AP lyase repair sites in the same polypeptide. PMID:26908655

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2010-04-01

    Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Recordmore » of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls

  10. Ethnic differences in primary angle-closure glaucoma.

    PubMed

    Yip, Jennifer L Y; Foster, Paul J

    2006-04-01

    Observational studies from different countries have shown that populations of East Asian origin have a higher frequency of primary angle-closure glaucoma compared with those of European or African descent. As half of all cases of glaucoma reside in Asia, and with primary angle-closure glaucoma carrying a higher rate of visual morbidity, primary angle-closure glaucoma poses an important public health problem; however, the inconsistent use of techniques and definitions to detect and diagnose primary angle-closure glaucoma has resulted in difficulties in interpreting the accuracy and comparability of such data. Therefore it is important to review these studies in the light of a consistent classification system. There are increasing reports that support previous findings on the incidence and prevalence of primary angle-closure glaucoma in different ethnic groups. There have also been further investigations into the mechanism and natural history of primary angle-closure glaucoma in Asian populations. International investigations into primary angle-closure glaucoma have demonstrated reproducible evidence that ethnic variations do exist. Cross-sectional studies in this area have also suggested that differences in anterior chamber depth, together with its association with peripheral anterior synechiae, may be part of the underlying mechanism behind these differences. The ideas generated need to be further explored with longitudinal data of changes in anterior chamber depth and peripheral anterior synechiae in different populations. The detailed mechanisms behind the development of angle-closure and primary angle-closure glaucoma should also be investigated.

  11. ASD Closure in Structural Heart Disease.

    PubMed

    Wiktor, Dominik M; Carroll, John D

    2018-04-17

    While the safety and efficacy of percutaneous ASD closure has been established, new data have recently emerged regarding the negative impact of residual iatrogenic ASD (iASD) following left heart structural interventions. Additionally, new devices with potential advantages have recently been studied. We will review here the potential indications for closure of iASD along with new generation closure devices and potential late complications requiring long-term follow-up. With the expansion of left-heart structural interventions and large-bore transseptal access, there has been growing experience gained with management of residual iASD. Some recently published reports have implicated residual iASD after these procedures as a potential source of diminished clinical outcomes and mortality. Additionally, recent trials investigating new generation closure devices as well as expanding knowledge regarding late complications of percutaneous ASD closure have been published. While percutaneous ASD closure is no longer a novel approach to managing septal defects, there are several contemporary issues related to residual iASD following large-bore transseptal access and new generation devices which serve as an impetus for this review. Ongoing attention to potential late complications and decreasing their incidence with ongoing study is clearly needed.

  12. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  13. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  14. Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs

  15. [Periprocedural and late complications after percutaneous closure of patent foramen ovale: a single centre experience].

    PubMed

    Węglarz, Przemysław; Konarska Kuszewska, Ewa; Spisak Borowska, Katarzyna; Machowski, Jerzy; Drzewiecka-Gerber, Agnieszka; Kuszewski, Piotr; Jackson, Christopher L; Opala, Grzegorz; Trusz Gluza, Maria

    2012-01-01

    Patent foramen ovale (PFO) is a potential risk factor for ischaemic stroke in young individuals. An interventional method of secondary stroke prevention in PFO patients is its percutaneous closure. To assess safety and effectiveness (i.e. lack of residual shunt) of percutaneous PFO closure in patients with history of cryptogenic cerebrovascular event. 149 patients (56 men/93 women), aged 39 ± 12 years, underwent percutaneous PFO closure. The implantation was performed under local anaesthesia, guided by trans-oesophageal echocardiography (TEE) and fluoroscopy. Follow-up trans-thoracic echocardiography (TTE) was performed at 1 month and follow-up TEE at 6-months. In cases of residual shunt, additional TEE was performed after ensuing 6 months. Effective PFO closure (no residual shunt) was achieved in 91.3% patients at 6 months and 95.3% patients at 12 months. In 2 patients transient atrial fibrillation was observed during the procedure. In 2 patients, a puncture site haematoma developed and in 1 patient superficial thrombophlebitis was noted. In 1 patient a small pericardial effusion was observed, which resolved at day 3 post-procedurally, after administration of non-steroidal anti-inflammatory drugs. Percutaneous PFO closure seems to be a safe procedure when performed in a centre with adequate expertise with regard to these procedures.

  16. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible

  18. Patent ductus arteriosus closure using an Amplatzer™ ventricular septal defect closure device

    PubMed Central

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs. PMID:24294051

  19. Papineau debridement, Ilizarov bone transport, and negative-pressure wound closure for septic bone defects of the tibia.

    PubMed

    Karargyris, Orestis; Polyzois, Vasilios D; Karabinas, Panayiotis; Mavrogenis, Andreas F; Pneumaticos, Spyros G

    2014-08-01

    Ilizarov pioneered bone transport using a circular external fixator. Papineau described a staged technique for the treatment for infected pseudarthrosis of the long bones. This article presents a single-stage Papineau technique and Ilizarov bone transport, and postoperative negative-pressure wound dressing changes for septic bone defects of the tibia. We studied the files of seven patients (mean age, 32 years) with septic bone defects of the tibia treated with a Papineau technique and Ilizarov bone transport in a single stage, followed by postoperative negative-pressure wound dressing changes. All patients had septic pseudarthrosis and skin necrosis of the tibia. The technique included a single-stage extensive surgical debridement of necrotic bone, open bone grafting with cancellous bone autograft and bone transport, and postoperative negative-pressure wound dressing changes for wound closure. The mean time from the initial injury was 6 months (range, 4-8 months). The mean follow-up was 14 months (range, 10-17 months). All patients experienced successful wound healing at a mean of 29 days. Six patients experienced successful bone regeneration and union at the docking side at a mean of 6 months. One patient experienced delayed union at the docking site, which was treated with autologous cancellous bone grafting. Two patients experienced pin track infection, which was successfully treated with antibiotics and pin site dressing changes. All patients were able to return to their work and previous levels of activity, except one patient who had a stiff ankle joint and had to change his job. No patient experienced recurrence of infection, or fracture of the regenerated or transported bone segment until the period of this study. The combined Papineau and Ilizarov bone transport technique with negative-pressure wound closure provides for successful eradication of the infection, reconstruction of the bone defect, and soft-tissue closure. A single-stage surgical treatment is

  20. 78 FR 75913 - Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Subtitle C barrier, a multi-layer barrier designed to provide 500-year protection. \\2\\ Under Tank Closure..., which means the tanks, ancillary equipment, and contaminated soil would be removed, and the remaining... Hanford barrier, a multi- layer barrier designed to provide 1,000-year protection. Alternative 6: All...

  1. Evaluation of the Momentum Closure Schemes in MPAS-Ocean

    NASA Astrophysics Data System (ADS)

    Zhao, Shimei; Liu, Yudi; Liu, Wei

    2018-04-01

    In order to compare and evaluate the performances of the Laplacian viscosity closure, the biharmonic viscosity closure, and the Leith closure momentum schemes in the MPAS-Ocean model, a variety of physical quantities, such as the relative reference potential energy (RPE) change, the RPE time change rate (RPETCR), the grid Reynolds number, the root mean square (RMS) of kinetic energy, and the spectra of kinetic energy and enstrophy, are calculated on the basis of results of a 3D baroclinic periodic channel. Results indicate that: 1) The RPETCR demonstrates a saturation phenomenon in baroclinic eddy tests. The critical grid Reynolds number corresponding to RPETCR saturation differs between the three closures: the largest value is in the biharmonic viscosity closure, followed by that in the Laplacian viscosity closure, and that in the Leith closure is the smallest. 2) All three closures can effectively suppress spurious dianeutral mixing by reducing the grid Reynolds number under sub-saturation conditions of the RPETCR, but they can also damage certain physical processes. Generally, the damage to the rotation process is greater than that to the advection process. 3) The dissipation in the biharmonic viscosity closure is strongly dependent on scales. Most dissipation concentrates on small scales, and the energy of small-scale eddies is often transferred to large-scale kinetic energy. The viscous dissipation in the Laplacian viscosity closure is the strongest on various scales, followed by that in the Leith closure. Note that part of the small-scale kinetic energy is also transferred to large-scale kinetic energy in the Leith closure. 4) The characteristic length scale L and the dimensionless parameter D in the Leith closure are inherently coupled. The RPETCR is inversely proportional to the product of D and L. When the product of D and L is constant, both the simulated RPETCR and the inhibition of spurious dianeutral mixing are the same in all tests using the Leith

  2. Umbilical hernia following gastroschisis closure: a common event?

    PubMed

    Tullie, L G C; Bough, G M; Shalaby, A; Kiely, E M; Curry, J I; Pierro, A; De Coppi, P; Cross, K M K

    2016-08-01

    To assess incidence and natural history of umbilical hernia following sutured and sutureless gastroschisis closure. With audit approval, we undertook a retrospective clinical record review of all gastroschisis closures in our institution (2007-2013). Patient demographics, gastroschisis closure method and umbilical hernia occurrence were recorded. Data, presented as median (range), underwent appropriate statistical analysis. Fifty-three patients were identified, gestation 36 weeks (31-38), birth weight 2.39 kg (1-3.52) and 23 (43 %) were male. Fourteen patients (26 %) underwent sutureless closure: 12 primary, 2 staged; and 39 (74 %) sutured closure: 19 primary, 20 staged. Sutured closure was interrupted sutures in 24 patients, 11 pursestring and 4 not specified. Fifty patients were followed-up over 53 months (10-101) and 22 (44 %) developed umbilical hernias. There was a significantly greater hernia incidence following sutureless closure (p = 0.0002). In sutured closure, pursestring technique had the highest hernia rate (64 %). Seven patients underwent operative hernia closure; three secondary to another procedure. Seven patients had their hernias resolve. One patient was lost to follow-up and seven remain under observation with no reported complications. There is a significant umbilical hernia incidence following sutureless and pursestring sutured gastroschisis closure. This has not led to complications and the majority have not undergone repair.

  3. [Percutaneous closure of atrial septal defects with the Amplatzer® device: 15 years of experience].

    PubMed

    Zabal-Cerdeira, Carlos; García-Montes, José Antonio; Sandoval-Jones, Juan Pablo; Calderón-Colmenero, Juan; Patiño-Bahena, Emilia; Juanico-Enríquez, Antonio; Buendía-Hernández, Alfonso

    2014-01-01

    Percutaneous closure of atrial septal defects is an alternative to surgical treatment. We report the results of percutaneous closure of atrial septal defects with the Amplatzer(®) device. We include patients taken to the catheterization laboratory from September 1997 to December 2011. We proceeded with defect closure in 721 patients and in 85 the defect was considered not suitable for closure. The stretched diameter of the defect was 23±6.7mm (limits, 5-42). All devices were positioned successfully. In 15 cases (2.1%) the device was changed due to instability and in 6 (0.8%) the device embolized within the first 24h, 4 were retrieved and repositioned (final success with intention to treat 719/806-89.2%). Immediate control showed complete closure in 247 patients (34.3%), leak through the device in 395 (54.9%), mild residual leak in 75 (10.4%) and moderate in 2 (0.3%). We have follow-up in 626 patients (87.1%) for 33±27.5 months, with headache in 54 (8.6%), new supraventricular arrhythmia in 10 (1.6%), puncture site complications in 4 (0.6%), and stroke in one (0.1%). The design of the Amplatzer(®) device allows effective closure of atrial septal defects with a simple technique and patient safety. Copyright © 2013 Instituto Nacional de Cardiología Ignacio Chávez. Published by Masson Doyma México S.A. All rights reserved.

  4. Duct closure

    DOEpatents

    Vowell, Kennison L.

    1987-01-01

    A closure for an inclined duct having an open upper end and defining downwardly extending passageway. The closure includes a cap for sealing engagement with the open upper end of the duct. Associated with the cap are an array of vertically aligned plug members, each of which has a cross-sectional area substantially conforming to the cross-sectional area of the passageway at least adjacent the upper end of the passageway. The plug members are interconnected in a manner to provide for free movement only in the plane in which the duct is inclined. The uppermost plug member is attached to the cap means and the cap means is in turn connected to a hoist means which is located directly over the open end of the duct.

  5. Three point-advancement closure for skin defects.

    PubMed

    Tamir, G; Birkby, C S; Berg, D

    1999-10-01

    Circular skin defects are common following Mohs' surgery. Traditional closure (primary, flap, or graft) may involve extensive surgery. Multidirectional advancement closures such as the purse-string closure have been advocated as another useful tool in such cases. To describe a variation on purse-string closure that, in certain cases, is an excellent alternative to other reconstructions, and will provide good cosmetic and functional outcome. A three-point anchoring suture is placed after undermining to advance the surrounding tissue toward the centre, creating a "Mercedes Benz" or tripod closure following removal of "dog-ears." Circular wounds in designated areas can be more easily closed, creating well-tolerated, favourable scars. Large wounds may be closed with the advantage of avoidance of larger flaps, of decreased wound healing compared to second intention, and of minimizing removal of healthy tissue. An initial trial of closure with this method does not limit subsequent use of other repairs should it be less than satisfactory.

  6. Gap geometry dictates epithelial closure efficiency

    PubMed Central

    Ravasio, Andrea; Cheddadi, Ibrahim; Chen, Tianchi; Pereira, Telmo; Ong, Hui Ting; Bertocchi, Cristina; Brugues, Agusti; Jacinto, Antonio; Kabla, Alexandre J.; Toyama, Yusuke; Trepat, Xavier; Gov, Nir; Neves de Almeida, Luís; Ladoux, Benoit

    2015-01-01

    Closure of wounds and gaps in tissues is fundamental for the correct development and physiology of multicellular organisms and, when misregulated, may lead to inflammation and tumorigenesis. To re-establish tissue integrity, epithelial cells exhibit coordinated motion into the void by active crawling on the substrate and by constricting a supracellular actomyosin cable. Coexistence of these two mechanisms strongly depends on the environment. However, the nature of their coupling remains elusive because of the complexity of the overall process. Here we demonstrate that epithelial gap geometry in both in vitro and in vivo regulates these collective mechanisms. In addition, the mechanical coupling between actomyosin cable contraction and cell crawling acts as a large-scale regulator to control the dynamics of gap closure. Finally, our computational modelling clarifies the respective roles of the two mechanisms during this process, providing a robust and universal mechanism to explain how epithelial tissues restore their integrity. PMID:26158873

  7. Rossby wave activity in a two-dimensional model - Closure for wave driving and meridional eddy diffusivity

    NASA Technical Reports Server (NTRS)

    Hitchman, Matthew H.; Brasseur, Guy

    1988-01-01

    A parameterization of the effects of Rossby waves in the middle atmosphere is proposed for use in two-dimensional models. By adding an equation for conservation of Rossby wave activity, closure is obtained for the meridional eddy fluxes and body force due to Rossby waves. Rossby wave activity is produced in a climatological fashion at the tropopause, is advected by a group velocity which is determined solely by model zonal winds, and is absorbed where it converges. Absorption of Rossby wave activity causes both an easterly torque and an irreversible mixing of potential vorticity, represented by the meridional eddy diffusivity, K(yy). The distribution of Rossby wave driving determines the distribution of K(yy), which is applied to all of the chemical constituents. This provides a self-consistent coupling of the wave activity with the winds, tracer distributions and the radiative field. Typical winter stratospheric values for K(yy) of 2 million sq m/sec are obtained. Poleward tracer advection is enhanced and meridional tracer gradients are reduced where Rossby wave activity is absorbed in the model.

  8. ABA-Induced Stomatal Closure Involves ALMT4, a Phosphorylation-Dependent Vacuolar Anion Channel of Arabidopsis[OPEN

    PubMed Central

    Baetz, Ulrike; Huck, Nicola V.; Zhang, Jingbo

    2017-01-01

    Stomatal pores are formed between a pair of guard cells and allow plant uptake of CO2 and water evaporation. Their aperture depends on changes in osmolyte concentration of guard cell vacuoles, specifically of K+ and Mal2−. Efflux of Mal2− from the vacuole is required for stomatal closure; however, it is not clear how the anion is released. Here, we report the identification of ALMT4 (ALUMINUM ACTIVATED MALATE TRANSPORTER4) as an Arabidopsis thaliana ion channel that can mediate Mal2− release from the vacuole and is required for stomatal closure in response to abscisic acid (ABA). Knockout mutants showed impaired stomatal closure in response to the drought stress hormone ABA and increased whole-plant wilting in response to drought and ABA. Electrophysiological data show that ALMT4 can mediate Mal2− efflux and that the channel activity is dependent on a phosphorylatable C-terminal serine. Dephosphomimetic mutants of ALMT4 S382 showed increased channel activity and Mal2− efflux. Reconstituting the active channel in almt4 mutants impaired growth and stomatal opening. Phosphomimetic mutants were electrically inactive and phenocopied the almt4 mutants. Surprisingly, S382 can be phosphorylated by mitogen-activated protein kinases in vitro. In brief, ALMT4 likely mediates Mal2− efflux during ABA-induced stomatal closure and its activity depends on phosphorylation. PMID:28874508

  9. Anterior Segment Imaging for Angle Closure.

    PubMed

    Chansangpetch, Sunee; Rojanapongpun, Prin; Lin, Shan C

    2018-04-01

    To summarize the role of anterior segment imaging (AS-imaging) in angle closure diagnosis and management, and the possible advantages over the current standard of gonioscopy. Literature review and perspective. Review of the pertinent publications with interpretation and perspective in relation to the use of AS-imaging in angle closure assessment focusing on anterior segment optical coherence tomography and ultrasound biomicroscopy. Several limitations have been encountered with the reference standard of gonioscopy for angle assessment. AS-imaging has been shown to have performance in angle closure detection compared to gonioscopy. Also, imaging has greater reproducibility and serves as better documentation for long-term follow-up than conventional gonioscopy. The qualitative and quantitative information obtained from AS-imaging enables better understanding of the underlying mechanisms of angle closure and provides useful parameters for risk assessment and possible prediction of the response to laser and surgical intervention. The latest technologies-including 3-dimensional imaging-have allowed for the assessment of the angle that simulates the gonioscopic view. These advantages suggest that AS-imaging has a potential to be a reference standard for the diagnosis and monitoring of angle closure disease in the future. Although gonioscopy remains the primary method of angle assessment, AS-imaging has an increasing role in angle closure screening and management. The test should be integrated into clinical practice as an adjunctive tool for angle assessment. It is arguable that AS-imaging should be considered first-line screening for patients at risk for angle closure. Copyright © 2018 Elsevier Inc. All rights reserved.

  10. A model for prioritizing landfills for remediation and closure: A case study in Serbia.

    PubMed

    Ubavin, Dejan; Agarski, Boris; Maodus, Nikola; Stanisavljevic, Nemanja; Budak, Igor

    2018-01-01

    The existence of large numbers of landfills that do not fulfill sanitary prerequisites presents a serious hazard for the environment in lower income countries. One of the main hazards is landfill leachate that contains various pollutants and presents a threat to groundwater. Groundwater pollution from landfills depends on various mutually interconnected factors such as the waste type and amount, the amount of precipitation, the landfill location characteristics, and operational measures, among others. Considering these factors, lower income countries face a selection problem where landfills urgently requiring remediation and closure must be identified from among a large number of sites. The present paper proposes a model for prioritizing landfills for closure and remediation based on multicriteria decision making, in which the hazards of landfill groundwater pollution are evaluated. The parameters for the prioritization of landfills are the amount of waste disposed, the amount of precipitation, the vulnerability index, and the rate of increase of the amount of waste in the landfill. Verification was performed using a case study in Serbia where all municipal landfills were included and 128 landfills were selected for prioritization. The results of the evaluation of Serbian landfills, prioritizing sites for closure and remediation, are presented for the first time. Critical landfills are identified, and prioritization ranks for the selected landfills are provided. Integr Environ Assess Manag 2018;14:105-119. © 2017 SETAC. © 2017 SETAC.

  11. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  12. Secure closure of the tracheal incision after natural orifice transluminal endoscopic surgery with a surgical sealant (CoSeal).

    PubMed

    Liu, Yun-Hen; Wu, Yi-Cheng; Chen, Tzu-Ping; Ko, Po-Jen

    2011-09-01

    To evaluate the effectiveness of surgical sealant (CoSeal) in sealing the tracheal assess sites after transtracheal thoracoscopy. Two dogs underwent transtracheal thoracic exploration and pericardial window creation. The thoracic cavity was approached with flexible bronchoscope through a 9-mm tracheal incision. The pericardial window was performed with a needle knife via the working channel of the bronchoscope, and the tracheal assess site was closed with CoSeal using a rubber catheter. The integrity of tracheal healing was evaluated under positive pressure ventilation. Transtracheal creation of pericardial window and closure of tracheal incision with CoSeal was successfully performed in both dogs. There was no evidence of air leaks from the chest tube during positive pressure ventilation. Autopsy revealed no injury to the mediastinum and intrathoracic structure. Endoscopic closure of tracheal access site of NOTES with CoSeal appears to be a feasible technique.

  13. Estimation of recharge through selected drainage wells and potential effects from well closure, Orange County, Florida

    USGS Publications Warehouse

    Bradner, L.A.

    1996-01-01

    Drainage wells have been used in Orange County, Florida, and surrounding areas to alleviate flooding and to control lake levels since 1904. Over 400 drainage wells have been drilled in the county, but many are now redundant because of surface drainage systems that have been installed within the last two or three decades. Most of the drainage wells emplace water into the Upper Floridan aquifer, a zone of high transmissivity within the Floridan aquifer system. In 1992, the Orange County Stormwater Management Department identified 23 wells that were considered noncritical or redundant for current drainage control. These wells were targeted for closure to eliminate maintenance and possible contamination problems. A 3-year study (1992 through 1994) encompassed several drainage basins in the county. Inflow to 18 of the 23 drainage wells on the noncritical list and the effects of closure of these noncritical wells on the potentiometric surface of the Upper Floridan aquifer were estimated. Three sites were chosen for intensive study and were used for further extrapolation to other noncritical sites. The total average annual recharge rate through the 18 selected wells was estimated to be 9 cubic feet per second, or about 6 million gallons per day. The highest rate of long-term recharge, 4.6 cubic feet per second, was to well H-35. Several wells on the noncritical list were already plugged or had blocked intakes. Yields, or the sum of surface-water outflows and drainage-well recharge, from the drainage basins ranged from 20 to 33 inches per year. In some of the basins, all the yield from the basin was recharge through a drainage well. In other basins, most of the yield was surface outflow through canals rather than to drainage wells. The removal of the recharge from closure of the wells was simulated by superposition in a three-dimensional ground-water flow model. As a second step in the model, water was also applied to two sites in western Orange County that could receive

  14. The receptor tyrosine kinase Pvr promotes tissue closure by coordinating corpse removal and epidermal zippering

    PubMed Central

    Garlena, Rebecca A.; Lennox, Ashley L.; Baker, Lewis R.; Parsons, Trish E.; Weinberg, Seth M.; Stronach, Beth E.

    2015-01-01

    A leading cause of human birth defects is the incomplete fusion of tissues, often manifested in the palate, heart or neural tube. To investigate the molecular control of tissue fusion, embryonic dorsal closure and pupal thorax closure in Drosophila are useful experimental models. We find that Pvr mutants have defects in dorsal midline closure with incomplete amnioserosa internalization and epidermal zippering, as well as cardia bifida. These defects are relatively mild in comparison to those seen with other signaling mutants, such as in the JNK pathway, and we demonstrate that JNK signaling is not perturbed by altering Pvr receptor tyrosine kinase activity. Rather, modulation of Pvr levels in the ectoderm has an impact on PIP3 membrane accumulation, consistent with a link to PI3K signal transduction. Polarized PI3K activity influences protrusive activity from the epidermal leading edge and the protrusion area changes in accord with Pvr signaling intensity, providing a possible mechanism to explain Pvr mutant phenotypes. Tissue-specific rescue experiments indicate a partial requirement in epithelial tissue, but confirm the essential role of Pvr in hemocytes for embryonic survival. Taken together, we argue that inefficient removal of the internalizing amnioserosa tissue by mutant hemocytes coupled with impaired midline zippering of mutant epithelium creates a situation in some embryos whereby dorsal midline closure is incomplete. Based on these observations, we suggest that efferocytosis (corpse clearance) could contribute to proper tissue closure and thus might underlie some congenital birth defects. PMID:26293306

  15. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarado, Juan; Matthews, Patrick

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reportsmore » and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.« less

  16. Activation of phenylalanine hydroxylase by phenylalanine does not require binding in the active site.

    PubMed

    Roberts, Kenneth M; Khan, Crystal A; Hinck, Cynthia S; Fitzpatrick, Paul F

    2014-12-16

    Phenylalanine hydroxylase (PheH), a liver enzyme that catalyzes the hydroxylation of excess phenylalanine in the diet to tyrosine, is activated by phenylalanine. The lack of activity at low levels of phenylalanine has been attributed to the N-terminus of the protein's regulatory domain acting as an inhibitory peptide by blocking substrate access to the active site. The location of the site at which phenylalanine binds to activate the enzyme is unknown, and both the active site in the catalytic domain and a separate site in the N-terminal regulatory domain have been proposed. Binding of catecholamines to the active-site iron was used to probe the accessibility of the active site. Removal of the regulatory domain increases the rate constants for association of several catecholamines with the wild-type enzyme by ∼2-fold. Binding of phenylalanine in the active site is effectively abolished by mutating the active-site residue Arg270 to lysine. The k(cat)/K(phe) value is down 10⁴ for the mutant enzyme, and the K(m) value for phenylalanine for the mutant enzyme is >0.5 M. Incubation of the R270K enzyme with phenylalanine also results in a 2-fold increase in the rate constants for catecholamine binding. The change in the tryptophan fluorescence emission spectrum seen in the wild-type enzyme upon activation by phenylalanine is also seen with the R270K mutant enzyme in the presence of phenylalanine. Both results establish that activation of PheH by phenylalanine does not require binding of the amino acid in the active site. This is consistent with a separate allosteric site, likely in the regulatory domain.

  17. Activation of Phenylalanine Hydroxylase by Phenylalanine Does Not Require Binding in the Active Site

    PubMed Central

    2015-01-01

    Phenylalanine hydroxylase (PheH), a liver enzyme that catalyzes the hydroxylation of excess phenylalanine in the diet to tyrosine, is activated by phenylalanine. The lack of activity at low levels of phenylalanine has been attributed to the N-terminus of the protein’s regulatory domain acting as an inhibitory peptide by blocking substrate access to the active site. The location of the site at which phenylalanine binds to activate the enzyme is unknown, and both the active site in the catalytic domain and a separate site in the N-terminal regulatory domain have been proposed. Binding of catecholamines to the active-site iron was used to probe the accessibility of the active site. Removal of the regulatory domain increases the rate constants for association of several catecholamines with the wild-type enzyme by ∼2-fold. Binding of phenylalanine in the active site is effectively abolished by mutating the active-site residue Arg270 to lysine. The kcat/Kphe value is down 104 for the mutant enzyme, and the Km value for phenylalanine for the mutant enzyme is >0.5 M. Incubation of the R270K enzyme with phenylalanine also results in a 2-fold increase in the rate constants for catecholamine binding. The change in the tryptophan fluorescence emission spectrum seen in the wild-type enzyme upon activation by phenylalanine is also seen with the R270K mutant enzyme in the presence of phenylalanine. Both results establish that activation of PheH by phenylalanine does not require binding of the amino acid in the active site. This is consistent with a separate allosteric site, likely in the regulatory domain. PMID:25453233

  18. Natural orifice transluminal endoscopic surgery gastrotomy closure with an over-the-endoscope clip: a randomized, controlled porcine study (with videos).

    PubMed

    von Renteln, Daniel; Schmidt, Arthur; Vassiliou, Melina C; Gieselmann, Maria; Caca, Karel

    2009-10-01

    Secure endoscopic closure of transgastric natural orifice transluminal endoscopic surgery (NOTES) access is of paramount importance. The over-the-scope clip (OTSC) system has previously been shown to be effective for NOTES gastrotomy closure. To compare OTSC gastrotomy closure with surgical closure. Randomized, controlled animal study. Animal facility laboratory. Thirty-six female domestic pigs. Gastrotomies were created by using a needle-knife and an 18-mm balloon. The animals were subsequently randomized to either open surgical repair with interrupted sutures or endoscopic repair with 12-mm OTSCs. In addition, pressurized leak tests were performed in ex vivo specimens of 18-mm scalpel incisions closed with suture (n = 14) and of intact stomachs (n = 10). The mean time for endoscopic closure was 9.8 minutes (range 3-22, SD 5.5). No complications occurred during either type of gastrotomy closure. At necropsy, examination of all OTSC and surgical closures demonstrated complete sealing of gastrotomy sites without evidence of injury to adjacent organs. Pressurized leak tests showed a mean burst pressure of 83 mm Hg (range 30-140, SD 27) for OTSC closures and 67 mm Hg (range 30-130, SD 27.7) for surgical sutures. Ex vivo hand-sewn sutures of 18-mm gastrotomies (n = 14) exhibited a mean burst pressure of 65 mm Hg (range 20-140, SD 31) and intact ex vivo stomachs (n = 10) had a mean burst pressure of 126 mm Hg (range 90-170, SD 28). The burst pressure of ex vivo intact stomachs was significantly higher compared with OTSC closures (P < .01), in vivo surgical closures (P < .01), and ex vivo hand-sewn closures (P < .01). There was a trend toward higher burst pressures in the OTSC closures compared with surgical closures (P = .063) and ex vivo hand-sewn closures (P = .094). In vivo surgical closures demonstrated similar burst pressures compared with ex vivo hand-sewn closures (P = .848). Nonsurvival setting. Endoscopic closure by using the OTSC system is comparable to

  19. Efficacy and Safety of Transthoracic Echocardiography Alone in Transcatheter Closure of Secundum-Type Atrial Septal Defects in Adults.

    PubMed

    Ding, Cheng; Chang, Jia-Kan; Lin, Chang-Chyi; Wu, Yong-Jian; Hsieh, Kai-Sheng

    2016-04-01

    On-site transthoracic echocardiography (TTE) to guide the transcutaneous closure of secundum-type atrial septal defects (ASDs) in the catheterization laboratory remains unclear, especially in adults. Between 2005 and 2012, a total of 82 adults underwent transcutaneous closure of ASDs. The initial 15 cases underwent the procedure with both on-site transesophageal echocardiography (TEE) and TTE monitoring. Since January 2008, a total of 67 patients underwent on-site TTE alone to guide the procedure. Among the 82 adult patients who underwent a transcutaneous closure of the secundum-type ASD procedure, all had successful closure of the defects, and no periprocedural adverse complications occurred. No statistical significance was observed in the successful complete shunt closure rate between the TEE plus TTE and TTE groups during sequential follow-up (postprocedure 24 hour [87% vs. 92%],1 month [93% vs. 95%], 3 month [93% vs. 97%], and 12 month [93% vs. 97%], P > 0.05, respectively) nor was a significant difference observed between the two groups, including decreased right ventricular dimension (29.5 ± 3.3 vs. 32.0 ± 4.9 mm, 26.5 ± 3.0 vs. 28.7 ± 4.6 mm, 26.2 ± 3.1 vs. 28.2 ± 4.8 mm, and 25.6 ± 2.8 vs. 27.7 ± 4.7 mm, P > 0.05, respectively) or increased left ventricular end-diastolic dimension (41.1 ± 2.0 vs. 42.6 ± 3.0 mm, 44.3 ± 2.7 vs. 45.5 ± 3.1 mm, 44.2 ± 2.8 vs. 45.4 ± 3.1 mm, 44.9 ± 2.7 vs. 45.8 ± 2.6 mm, P > 0.05, respectively) before the procedure, and at the 3-, 6-, and 12-month follow-up evaluations. This study showed that TTE guidance alone may be considered efficacious and safe as TEE during a transcutaneous ASD occlusion procedure in select adults. © 2015, Wiley Periodicals, Inc.

  20. Analytic closures for M1 neutrino transport

    DOE PAGES

    Murchikova, E. M.; Abdikamalov, E.; Urbatsch, T.

    2017-04-25

    Carefully accounting for neutrino transport is an essential component of many astrophysical studies. Solving the full transport equation is too expensive for most realistic applications, especially those involving multiple spatial dimensions. For such cases, resorting to approximations is often the only viable option for obtaining solutions. One such approximation, which recently became popular, is the M1 method. It utilizes the system of the lowest two moments of the transport equation and closes the system with an ad hoc closure relation. The accuracy of the M1 solution depends on the quality of the closure. Several closures have been proposed in themore » literature and have been used in various studies. We carry out an extensive study of these closures by comparing the results of M1 calculations with precise Monte Carlo calculations of the radiation field around spherically symmetric protoneutron star models. We find that no closure performs consistently better or worse than others in all cases. The level of accuracy that a given closure yields depends on the matter configuration, neutrino type and neutrino energy. As a result, given this limitation, the maximum entropy closure by Minerbo on average yields relatively accurate results in the broadest set of cases considered in this work.« less

  1. 31 CFR 413.1 - Closure of streets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Closure of streets. 413.1 Section 413.1 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.1 Closure of streets. (a) District...

  2. 31 CFR 413.1 - Closure of streets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 2 2013-07-01 2013-07-01 false Closure of streets. 413.1 Section 413.1 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.1 Closure of streets. (a) District...

  3. 31 CFR 413.1 - Closure of streets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Closure of streets. 413.1 Section 413.1 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.1 Closure of streets. (a) District...

  4. 31 CFR 413.1 - Closure of streets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Closure of streets. 413.1 Section 413.1 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.1 Closure of streets. (a) District...

  5. 31 CFR 413.1 - Closure of streets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false Closure of streets. 413.1 Section 413.1 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.1 Closure of streets. (a) District...

  6. Over-the-scope clip placement for closure of gastrointestinal fistula, postoperative leaks and refractory gastrointestinal bleed.

    PubMed

    Nasa, Mukesh; Sharma, Zubin Dev; Choudhary, Narendra S; Patil, Gaurav; Puri, Rajesh; Sud, Randhir

    2016-09-01

    The over-the-scope clip (OTSC) has been successfully used in the closure of fistula, perforation, dehiscence, and endoscopic hemostasis. We describe our experience with the OTSC application. Between April 2014 and April 2015, seven patients underwent OTSC application. In four patients, OTSC was applied for the closure of esophageal fistula, one had OTSC closure of persistent gastrocutaneous fistula after percutaneous endoscopic gastrostomy removal, and OTSC was applied in duodenum in two patients, for duodenal Dieulafoy's lesion after failed conventional endotherapy and massive rebleed in one and duodenal perforation in another. All procedures had technical success with no immediate complication related to OTSC application. Patients were followed up for every month with mean duration of follow up 10.2 months. One patient with bronchoesophageal fistula had development of another fistulous opening above the site of OTSC placement, which was successfully closed with another OTSC. One patient had superficial esophageal wall ulcer opposite the OTSC but it healed spontaneously. OTSC provided safe and successful closure in a number of settings.

  7. 77 FR 75186 - Notice of Closure, Target Shooting Public Safety Closure on the Lake Mountains in Utah County, UT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... Closure, Target Shooting Public Safety Closure on the Lake Mountains in Utah County, UT AGENCY: Bureau of... Lake Mountains in Utah County, Utah, to recreational target shooting to protect public safety. This... shooting closure within the described area will remain in effect no longer than two years from December 19...

  8. Non-competitive inhibition by active site binders.

    PubMed

    Blat, Yuval

    2010-06-01

    Classical enzymology has been used for generations to understand the interactions of inhibitors with their enzyme targets. Enzymology tools enabled prediction of the biological impact of inhibitors as well as the development of novel, more potent, ones. Experiments designed to examine the competition between the tested inhibitor and the enzyme substrate(s) are the tool of choice to identify inhibitors that bind in the active site. Competition between an inhibitor and a substrate is considered a strong evidence for binding of the inhibitor in the active site, while the lack of competition suggests binding to an alternative site. Nevertheless, exceptions to this notion do exist. Active site-binding inhibitors can display non-competitive inhibition patterns. This unusual behavior has been observed with enzymes utilizing an exosite for substrate binding, isomechanism enzymes, enzymes with multiple substrates and/or products and two-step binding inhibitors. In many of these cases, the mechanisms underlying the lack of competition between the substrate and the inhibitor are well understood. Tools like alternative substrates, testing the enzyme reaction in the reverse direction and monitoring inhibition time dependence can be applied to enable distinction between 'badly behaving' active site binders and true exosite inhibitors.

  9. APPARATUS AND METHOD FOR WELDING END CLOSURE TO CONTAINER

    DOEpatents

    Frantz, C.E.; Correy, T.B.

    1959-08-01

    A semi-automatic apparatus is described for welding a closure to the open end of a can containing a nuclear fuel slug. An arc is struck at the center of the closure and is shifted to a region near its periphery. Then the assembly of closure, can, and fuel slug is rotated so that the peripheral region of the closure is preheated. Next the arc is shifted to the periphery itself of the closure, and the assembly is rotated so that the closure is welded to the can.

  10. Frictionless segmented mechanics for controlled space closure

    PubMed Central

    Andrade, Ildeu

    2017-01-01

    ABSTRACT Extraction spaces may be needed to achieve specific orthodontic goals of positioning the dentition in harmony with the craniofacial complex. However, the fundamental reality that determines the occlusion final position is the control exerted by the orthodontist while closing the extraction spaces. A specific treatment objective may require the posterior teeth to remain in a constant position anteroposteriorly as well as vertically, while the anterior teeth occupy the entire extraction site. Another treatment objective may require the opposite, or any number of intentional alternatives of extraction site closure. The present case report describes a simple controlled segmented mechanic system that permitted definable and predictable force systems to be applied and allowed to predict the treatment outcome with confidence. This case was presented to the Brazilian Board of Orthodontics and Dentofacial Orthopedics (BBO) in partial fulfillment of the requirements for Diplomate certification. PMID:28444016

  11. Anterior Segment Imaging Predicts Incident Gonioscopic Angle Closure.

    PubMed

    Baskaran, Mani; Iyer, Jayant V; Narayanaswamy, Arun K; He, Yingke; Sakata, Lisandro M; Wu, Renyi; Liu, Dianna; Nongpiur, Monisha E; Friedman, David S; Aung, Tin

    2015-12-01

    To investigate the incidence of gonioscopic angle closure after 4 years in subjects with gonioscopically open angles but varying degrees of angle closure detected on anterior segment optical coherence tomography (AS OCT; Visante; Carl Zeiss Meditec, Dublin, CA) at baseline. Prospective, observational study. Three hundred forty-two subjects, mostly Chinese, 50 years of age or older, were recruited, of whom 65 were controls with open angles on gonioscopy and AS OCT at baseline, and 277 were cases with baseline open angles on gonioscopy but closed angles (1-4 quadrants) on AS OCT scans. All subjects underwent gonioscopy and AS OCT at baseline (horizontal and vertical single scans) and after 4 years. The examiner performing gonioscopy was masked to the baseline and AS OCT data. Angle closure in a quadrant was defined as nonvisibility of the posterior trabecular meshwork by gonioscopy and visible iridotrabecular contact beyond the scleral spur in AS OCT scans. Gonioscopic angle closure in 2 or 3 quadrants after 4 years. There were no statistically significant differences in age, ethnicity, or gender between cases and controls. None of the control subjects demonstrated gonioscopic angle closure after 4 years. Forty-eight of the 277 subjects (17.3%; 95% confidence interval [CI], 12.8-23; P < 0.0001) with at least 1 quadrant of angle closure on AS OCT at baseline demonstrated gonioscopic angle closure in 2 or more quadrants, whereas 28 subjects (10.1%; 95% CI, 6.7-14.6; P < 0.004) demonstrated gonioscopic angle closure in 3 or more quadrants after 4 years. Individuals with more quadrants of angle closure on baseline AS OCT scans had a greater likelihood of gonioscopic angle closure developing after 4 years (P < 0.0001, chi-square test for trend for both definitions of angle closure). Anterior segment OCT imaging at baseline predicts incident gonioscopic angle closure after 4 years among subjects who have gonioscopically open angles and iridotrabecular contact on AS OCT at

  12. Rubber closures for freeze-dried products.

    PubMed

    Hopkins, G H

    1976-10-01

    Once a biological product has been developed to perform its required medical or pharmaceutical function, it is essential that a container-closure system by chosen which will preserve the efficacy of the product up to the point of administration. The general requirements applicable to proper closure function will be reviewed and the suitability of natural and synthetic elastomers to perform these functions will be discussed. The specialized application of elastomeric materials as closures for freeze-dried products presents additional requirements which are superimposed upon those previously discussed. The first of these unique considerations relates to the proper physical design which will permit the outgassing of water vapor during the sublimation step in the lyophilizing chamber. During this outgassing the design must also permit the closure to remain affixed in the neck while only partially inserted. Since these preparations are lyophilized because they are unstable in aqueous solutions, the elastomer used must constitute an effective barrier to the transmission of moisture vapor through the closure. The MVT and gas transmission properties of elastomers will be discussed. Special consideration will be given to the extremely low temperatures used in the sublimation, stoppering, and storage before use of lyophilized products. The phenomenon of glass transition points with different elastomers will be explained as its relation to satisfactory performance of the closure function at low temperatures.

  13. Patent ductus arteriosus closure using an Amplatzer(™) ventricular septal defect closure device.

    PubMed

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs.

  14. 50 CFR 622.43 - Closures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following closure restrictions apply (See § 622.49 for closure provisions when an ACL is reached or... quota specified in § 622.42, or the ACL specified in 622.49, being reached and subsequent data indicate that the quota or ACL was not reached, the Assistant Administrator may file a notification to that...

  15. Long-Term Outcomes of Patent Foramen Ovale Closure or Medical Therapy after Stroke.

    PubMed

    Saver, Jeffrey L; Carroll, John D; Thaler, David E; Smalling, Richard W; MacDonald, Lee A; Marks, David S; Tirschwell, David L

    2017-09-14

    Whether closure of a patent foramen ovale reduces the risk of recurrence of ischemic stroke in patients who have had a cryptogenic ischemic stroke is unknown. In a multicenter, randomized, open-label trial, with blinded adjudication of end-point events, we randomly assigned patients 18 to 60 years of age who had a patent foramen ovale (PFO) and had had a cryptogenic ischemic stroke to undergo closure of the PFO (PFO closure group) or to receive medical therapy alone (aspirin, warfarin, clopidogrel, or aspirin combined with extended-release dipyridamole; medical-therapy group). The primary efficacy end point was a composite of recurrent nonfatal ischemic stroke, fatal ischemic stroke, or early death after randomization. The results of the analysis of the primary outcome from the original trial period have been reported previously; the current analysis of data from the extended follow-up period was considered to be exploratory. We enrolled 980 patients (mean age, 45.9 years) at 69 sites. Patients were followed for a median of 5.9 years. Treatment exposure in the two groups was unequal (3141 patient-years in the PFO closure group vs. 2669 patient-years in the medical-therapy group), owing to a higher dropout rate in the medical-therapy group. In the intention-to-treat population, recurrent ischemic stroke occurred in 18 patients in the PFO closure group and in 28 patients in the medical-therapy group, resulting in rates of 0.58 events per 100 patient-years and 1.07 events per 100 patient-years, respectively (hazard ratio with PFO closure vs. medical therapy, 0.55; 95% confidence interval [CI], 0.31 to 0.999; P=0.046 by the log-rank test). Recurrent ischemic stroke of undetermined cause occurred in 10 patients in the PFO closure group and in 23 patients in the medical-therapy group (hazard ratio, 0.38; 95% CI, 0.18 to 0.79; P=0.007). Venous thromboembolism (which comprised events of pulmonary embolism and deep-vein thrombosis) was more common in the PFO closure group

  16. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  17. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  18. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  19. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  20. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment

  1. Some Recent Developments in Turbulence Closure Modeling

    NASA Astrophysics Data System (ADS)

    Durbin, Paul A.

    2018-01-01

    Turbulence closure models are central to a good deal of applied computational fluid dynamical analysis. Closure modeling endures as a productive area of research. This review covers recent developments in elliptic relaxation and elliptic blending models, unified rotation and curvature corrections, transition prediction, hybrid simulation, and data-driven methods. The focus is on closure models in which transport equations are solved for scalar variables, such as the turbulent kinetic energy, a timescale, or a measure of anisotropy. Algebraic constitutive representations are reviewed for their role in relating scalar closures to the Reynolds stress tensor. Seamless and nonzonal methods, which invoke a single closure model, are reviewed, especially detached eddy simulation (DES) and adaptive DES. Other topics surveyed include data-driven modeling and intermittency and laminar fluctuation models for transition prediction. The review concludes with an outlook.

  2. Climate change and landscape development in post-closure safety assessment of solid radioactive waste disposal: Results of an initiative of the IAEA.

    PubMed

    Lindborg, T; Thorne, M; Andersson, E; Becker, J; Brandefelt, J; Cabianca, T; Gunia, M; Ikonen, A T K; Johansson, E; Kangasniemi, V; Kautsky, U; Kirchner, G; Klos, R; Kowe, R; Kontula, A; Kupiainen, P; Lahdenperä, A-M; Lord, N S; Lunt, D J; Näslund, J-O; Nordén, M; Norris, S; Pérez-Sánchez, D; Proverbio, A; Riekki, K; Rübel, A; Sweeck, L; Walke, R; Xu, S; Smith, G; Pröhl, G

    2018-03-01

    The International Atomic Energy Agency has coordinated an international project addressing climate change and landscape development in post-closure safety assessments of solid radioactive waste disposal. The work has been supported by results of parallel on-going research that has been published in a variety of reports and peer reviewed journal articles. The project is due to be described in detail in a forthcoming IAEA report. Noting the multi-disciplinary nature of post-closure safety assessments, here, an overview of the work is given to provide researchers in the broader fields of radioecology and radiological safety assessment with a review of the work that has been undertaken. It is hoped that such dissemination will support and promote integrated understanding and coherent treatment of climate change and landscape development within an overall assessment process. The key activities undertaken in the project were: identification of the key processes that drive environmental change (mainly those associated with climate and climate change), and description of how a relevant future may develop on a global scale; development of a methodology for characterising environmental change that is valid on a global scale, showing how modelled global changes in climate can be downscaled to provide information that may be needed for characterising environmental change in site-specific assessments, and illustrating different aspects of the methodology in a number of case studies that show the evolution of site characteristics and the implications for the dose assessment models. Overall, the study has shown that quantitative climate and landscape modelling has now developed to the stage that it can be used to define an envelope of climate and landscape change scenarios at specific sites and under specific greenhouse-gas emissions assumptions that is suitable for use in quantitative post-closure performance assessments. These scenarios are not predictions of the future, but

  3. Use of percutaneous closure devices in the removal of central venous catheters from inadvertent arterial catheterizations.

    PubMed

    Guimaraes, M; Uflacker, R; Schonholz, C; Hannegan, C; Selby, B

    2008-06-01

    Although rare, misplacement of central venous catheters in supra-aortic arteries is potentially fatal. Five patients had safe catheters removal using percutaneous closure devices. Three patients were coagulopathic, 3 under intensive care and 1 in immediate postoperative limb amputation. Patients were treated successfully, with immediate hemostasis and without complications in a mean follow-up of 12.5 months. Although the number of patients is small, the closure devices proved to be safe. This is a minimally invasive alternative technique in the management of large bore catheters removed from non-compressible puncture sites such as subclavian and brachiocephalic arteries.

  4. Mechanisms for ductus arteriosus closure.

    PubMed

    Coceani, Flavio; Baragatti, Barbara

    2012-04-01

    Closure of the ductus arteriosus at birth is a complex phenomenon being conditioned by antenatal events and progressing in preprogrammed steps. Functional at first, narrowing of the vessel is determined by 2 overlapping processes--removal of the prostaglandin E(2)-based relaxation sustaining prenatal patency and activation of a constrictor mechanism by the natural rise in blood oxygen tension. Two schemes have been proposed for oxygen action--one involving a cytochrome P450 hemoprotein (sensor)/endothelin-1 (effector) complex and the other a set of voltage-gated K(+) channels. These proposals, however, are not mutually exclusive. Structural closure follows the constriction through a remodeling process initiated antenatally with the development of intimal cushions and completed postnatally by a host of humoral and mechanical stimuli. Research in this area has already provided clinical applications. Nevertheless, management of premature infants with persistent ductus remains troublesome and calls for an alternative approach to the prostaglandin E(2) inhibitors now in use. Studies in progress on the oxygen-sensing system may lead to a definitive solution for this problem. Copyright © 2012 Elsevier Inc. All rights reserved.

  5. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The Resource Conservation and Recovery Act, among other things, helps ensure that wastes are managed in an environmentally sound manner so as to protect human health and the environment from the potential hazards of waste disposal.In particular RCRA tightly regulates all hazardous waste from cradle to grave. In general, all generators, transporters, treaters, storers, and disposers of hazardous waste are required to provide information about their activities to state environmental agencies. These agencies, in turn pass on the information to regional and national EPA offices. Accidents or other activities at facilities that treat, store or dispose of hazardous wastes have sometimes led to the release of hazardous waste or hazardous constituents into soil, ground water, surface water, or air. When that happens, the RCRA Corrective Action program is one program that may be used to accomplish the necessary cleanup.This data layer shows those RCRA sites that are located at BRAC Federal Facilities. Additional RCRA sites and other BRAC sites (those that are not RCRA sites) are included in other data layers as part of this web service.Note: RCRA facilities which are not undergoing corrective action are not considered ??Cleanups?? in Cleanups in My Community. The complete set of RCRA facilities can be accessed via

  6. Laryngeal closure impedes non-invasive ventilation at birth

    PubMed Central

    Crawshaw, Jessica R; Kitchen, Marcus J; Binder-Heschl, Corinna; Thio, Marta; Wallace, Megan J; Kerr, Lauren T; Roehr, Charles C; Lee, Katie L; Buckley, Genevieve A; Davis, Peter G; Flemmer, Andreas; te Pas, Arjan B; Hooper, Stuart B

    2018-01-01

    Background Non-invasive ventilation is sometimes unable to provide the respiratory needs of very premature infants in the delivery room. While airway obstruction is thought to be the main problem, the site of obstruction is unknown. We investigated whether closure of the larynx and epiglottis is a major site of airway obstruction. Methods We used phase contrast X-ray imaging to visualise laryngeal function in spontaneously breathing premature rabbits immediately after birth and at approximately 1 hour after birth. Non-invasive respiratory support was applied via a facemask and images were analysed to determine the percentage of the time the glottis and the epiglottis were open. Hypothesis Immediately after birth, the larynx is predominantly closed, only opening briefly during a breath, making non-invasive intermittent positive pressure ventilation (iPPV) ineffective, whereas after lung aeration, the larynx is predominantly open allowing non-invasive iPPV to ventilate the lung. Results The larynx and epiglottis were predominantly closed (open 25.5%±1.1% and 17.1%±1.6% of the time, respectively) in pups with unaerated lungs and unstable breathing patterns immediately after birth. In contrast, the larynx and the epiglottis were mostly open (90.5%±1.9% and 72.3%±2.3% of the time, respectively) in pups with aerated lungs and stable breathing patterns irrespective of time after birth. Conclusion Laryngeal closure impedes non-invasive iPPV at birth and may reduce the effectiveness of non-invasive respiratory support in premature infants immediately after birth. PMID:29054974

  7. Ionizable Side Chains at Catalytic Active Sites of Enzymes

    PubMed Central

    Jimenez-Morales, David; Liang, Jie

    2012-01-01

    Catalytic active sites of enzymes of known structure can be well defined by a modern program of computational geometry. The CASTp program was used to define and measure the volume of the catalytic active sites of 573 enzymes in the Catalytic Site Atlas database. The active sites are identified as catalytic because the amino acids they contain are known to participate in the chemical reaction catalyzed by the enzyme. Acid and base side chains are reliable markers of catalytic active sites. The catalytic active sites have 4 acid and 5 base side chains, in an average volume of 1072 Å3. The number density of acid side chains is 8.3 M (in chemical units); the number density of basic side chains is 10.6 M. The catalytic active site of these enzymes is an unusual electrostatic and steric environment in which side chains and reactants are crowded together in a mixture more like an ionic liquid than an ideal infinitely dilute solution. The electrostatics and crowding of reactants and side chains seems likely to be important for catalytic function. In three types of analogous ion channels, simulation of crowded charges accounts for the main properties of selectivity measured in a wide range of solutions and concentrations. It seems wise to use mathematics designed to study interacting complex fluids when making models of the catalytic active sites of enzymes. PMID:22484856

  8. A Rab5 GTPase module is important for autophagosome closure

    PubMed Central

    Lipatova, Zhanna; Sun, Dan; Zhu, Xiaolong; Li, Rui; Wu, Zulin; You, Weiming; Cong, Xiaoxia; Zhou, Yiting; Gyurkovska, Valeriya; Liu, Yutao; Li, Qunli; Li, Wenjing; Cheng, Jie; Segev, Nava

    2017-01-01

    In the conserved autophagy pathway, the double-membrane autophagosome (AP) engulfs cellular components to be delivered for degradation in the lysosome. While only sealed AP can productively fuse with the lysosome, the molecular mechanism of AP closure is currently unknown. Rab GTPases, which regulate all intracellular trafficking pathways in eukaryotes, also regulate autophagy. Rabs function in GTPase modules together with their activators and downstream effectors. In yeast, an autophagy-specific Ypt1 GTPase module, together with a set of autophagy-related proteins (Atgs) and a phosphatidylinositol-3-phosphate (PI3P) kinase, regulates AP formation. Fusion of APs and endosomes with the vacuole (the yeast lysosome) requires the Ypt7 GTPase module. We have previously shown that the Rab5-related Vps21, within its endocytic GTPase module, regulates autophagy. However, it was not clear which autophagy step it regulates. Here, we show that this module, which includes the Vps9 activator, the Rab5-related Vps21, the CORVET tethering complex, and the Pep12 SNARE, functions after AP expansion and before AP closure. Whereas APs are not formed in mutant cells depleted for Atgs, sealed APs accumulate in cells depleted for the Ypt7 GTPase module members. Importantly, depletion of individual members of the Vps21 module results in a novel phenotype: accumulation of unsealed APs. In addition, we show that Vps21-regulated AP closure precedes another AP maturation step, the previously reported PI3P phosphatase-dependent Atg dissociation. Our results delineate three successive steps in the autophagy pathway regulated by Rabs, Ypt1, Vps21 and Ypt7, and provide the first insight into the upstream regulation of AP closure. PMID:28934205

  9. The impact of a temporary recurrent street closure on physical activity in New York City.

    PubMed

    Wolf, Sarah A; Grimshaw, Victoria E; Sacks, Rachel; Maguire, Thomas; Matera, Catherine; Lee, Karen K

    2015-04-01

    At least 70 US cities have now introduced ciclovías-large-scale street closures to promote physical activity-joining numerous other cities worldwide that have implemented ciclovías in efforts to improve population health. We assessed the impact of Summer Streets, a New York City program in which 6.9 contiguous miles of urban streets were closed to traffic and opened for walking, cycling, and group activities, such as dancing and yoga, on population physical activity levels. Screen line counts were used to estimate attendance, and a street intercept survey was conducted to assess demographic characteristics of participants, baseline adherence to physical activity recommendations, and type and duration of physical activity at Summer Streets. In addition, a traffic study was used to determine if there were vehicular traffic delays as a result of the program. About 50,000 people participated in Summer Streets; among participating New Yorkers, bicyclists averaged 6.7 miles, runners 4.3 miles, and walkers 3.6 miles, equivalent to 72-86 min of moderate physical activity. Among New Yorkers attending Summer Streets, 24 % reported that they did not routinely engage in moderate- or vigorous-intensity physical activity. These non-routine exercisers engaged in the equivalent of 26-68 min of moderate-intensity physical activity at Summer Streets. Summer Streets served as an enticement for New Yorkers, including those who did not ordinarily meet physical activity recommendations, to engage in physical activity. There were no significant vehicular traffic delays during the program.

  10. Discriminative structural approaches for enzyme active-site prediction.

    PubMed

    Kato, Tsuyoshi; Nagano, Nozomi

    2011-02-15

    Predicting enzyme active-sites in proteins is an important issue not only for protein sciences but also for a variety of practical applications such as drug design. Because enzyme reaction mechanisms are based on the local structures of enzyme active-sites, various template-based methods that compare local structures in proteins have been developed to date. In comparing such local sites, a simple measurement, RMSD, has been used so far. This paper introduces new machine learning algorithms that refine the similarity/deviation for comparison of local structures. The similarity/deviation is applied to two types of applications, single template analysis and multiple template analysis. In the single template analysis, a single template is used as a query to search proteins for active sites, whereas a protein structure is examined as a query to discover the possible active-sites using a set of templates in the multiple template analysis. This paper experimentally illustrates that the machine learning algorithms effectively improve the similarity/deviation measurements for both the analyses.

  11. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure... frequently contain provisions limiting the extent of environmental analysis required for actions taken under...

  12. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure... frequently contain provisions limiting the extent of environmental analysis required for actions taken under...

  13. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  14. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  15. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  16. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  17. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  18. Growth plate closure: Apex view on bone scan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giles, P.H.; Trochei, M.; Yeates, K.

    1984-01-01

    Angular deformities of the extremities in children following premature closure of the growth plate are well known. The deformities depend on the position of an osseus bridge which forms between the epiphysis and metaphysis. Several surgical procedures including resection of the osseus bridge have been described, however, delineation of the site of fusion is difficult to define. The commonest site of growth plate arrest is the distal femoral or proximal tibial growth plate. A new technique using the bone scan has been developed which accurately defines the area and position of these osseus bridges. Two hours after injection of technetiummore » 99m methylene diphosphonate apex views of the affected distal femoral growth plate were performed. The knee was flexed into its smallest angle. Using a pinhole collimator the gamma camera was angled to face the affected growth plate end on. The image was collected onto computer and analysed by: (I) regions of interest over segments of the growth plate to calculate the relative area of total growth plate affected: (II) generating histograms: (III) thresholding or performing isocontours to accentuate abnormal areas. The growth plate is normally uniformly increased when compared to the normal shaft of the bone. Fusion across the plate appears as an area of diminished uptake. The apex view gives a unique functional map of the growth plate such that abnormal areas are displayed, and the site, size and position of osseus fusion obtained. The technique has the potential for determining the metabolic activity of the growth plate before and after surgery. Serial studies will allow assessment of regneration of the plate and reformation of new osseus bridges.« less

  19. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for fiscal year 2013 (October 2012 - September 2013)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2014-01-31

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches.

  20. 75 FR 64718 - Environmental Management Site-Specific Advisory Board, Nevada

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... Industrial Sites and Soils Committees of the Environmental Management Site-Specific Advisory Board (EM SSAB... Test Site including decontamination, closure, re-use and/or demolition. Purpose of the Soils Committee: The purpose of the Committee is to focus on issues related to soil contamination at the Nevada Test...

  1. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  2. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  3. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  4. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  5. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  6. Addendum to the Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation

  7. Dramatic increase in the relative abundance of large male dungeness crabs Cancer magister following closure of commercial fishing in Glacier Bay, Alaska

    USGS Publications Warehouse

    Taggart, S. James; Shirley, Thomas C.; O'Clair, Charles E.; Mondragon, Jennifer

    2004-01-01

    The size structure of the population of the Dungeness crab Cancer magister was studied at six sites in or near Glacier Bay, Alaska, before and after the closure of commercial fishing. Seven years of preclosure and 4 years of postclosure data are presented. After the closure of Glacier Bay to commercial fishing, the number and size of legal-sized male Dungeness crabs increased dramatically at the experimental sites. Female and sublegal-sized male crabs, the portions of the population not directly targeted by commercial fishing, did not increase in size or abundance following the closure. There was not a large shift in the size-abundance distribution of male crabs at the control site that is still open to commercial fishing. Marine protected areas are being widely promoted as effective tools for managing fisheries while simultaneously meeting marine conservation goals and maintaining marine biodiversity. Our data demonstrate that the size of male Dungeness crabs can markedly increase in a marine reserve, which supports the concept that marine reserves could help maintain genetic diversity in Dungeness crabs and other crab species subjected to size-limit fisheries and possibly increase the fertility of females. ?? 2004 by the American Fisheries Society.

  8. Ionizable side chains at catalytic active sites of enzymes.

    PubMed

    Jimenez-Morales, David; Liang, Jie; Eisenberg, Bob

    2012-05-01

    Catalytic active sites of enzymes of known structure can be well defined by a modern program of computational geometry. The CASTp program was used to define and measure the volume of the catalytic active sites of 573 enzymes in the Catalytic Site Atlas database. The active sites are identified as catalytic because the amino acids they contain are known to participate in the chemical reaction catalyzed by the enzyme. Acid and base side chains are reliable markers of catalytic active sites. The catalytic active sites have 4 acid and 5 base side chains, in an average volume of 1,072 Å(3). The number density of acid side chains is 8.3 M (in chemical units); the number density of basic side chains is 10.6 M. The catalytic active site of these enzymes is an unusual electrostatic and steric environment in which side chains and reactants are crowded together in a mixture more like an ionic liquid than an ideal infinitely dilute solution. The electrostatics and crowding of reactants and side chains seems likely to be important for catalytic function. In three types of analogous ion channels, simulation of crowded charges accounts for the main properties of selectivity measured in a wide range of solutions and concentrations. It seems wise to use mathematics designed to study interacting complex fluids when making models of the catalytic active sites of enzymes.

  9. Uncertainty Quantification of Multi-Phase Closures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nadiga, Balasubramanya T.; Baglietto, Emilio

    In the ensemble-averaged dispersed phase formulation used for CFD of multiphase ows in nuclear reactor thermohydraulics, closures of interphase transfer of mass, momentum, and energy constitute, by far, the biggest source of error and uncertainty. Reliable estimators of this source of error and uncertainty are currently non-existent. Here, we report on how modern Validation and Uncertainty Quanti cation (VUQ) techniques can be leveraged to not only quantify such errors and uncertainties, but also to uncover (unintended) interactions between closures of di erent phenomena. As such this approach serves as a valuable aide in the research and development of multiphase closures.more » The joint modeling of lift, drag, wall lubrication, and turbulent dispersion|forces that lead to tranfer of momentum between the liquid and gas phases|is examined in the frame- work of validation of the adiabatic but turbulent experiments of Liu and Banko , 1993. An extensive calibration study is undertaken with a popular combination of closure relations and the popular k-ϵ turbulence model in a Bayesian framework. When a wide range of super cial liquid and gas velocities and void fractions is considered, it is found that this set of closures can be validated against the experimental data only by allowing large variations in the coe cients associated with the closures. We argue that such an extent of variation is a measure of uncertainty induced by the chosen set of closures. We also nd that while mean uid velocity and void fraction pro les are properly t, uctuating uid velocity may or may not be properly t. This aspect needs to be investigated further. The popular set of closures considered contains ad-hoc components and are undesirable from a predictive modeling point of view. Consequently, we next consider improvements that are being developed by the MIT group under CASL and which remove the ad-hoc elements. We use non-intrusive methodologies for sensitivity analysis and calibration

  10. Space Station evolution study oxygen loop closure

    NASA Technical Reports Server (NTRS)

    Wood, M. G.; Delong, D.

    1993-01-01

    In the current Space Station Freedom (SSF) Permanently Manned Configuration (PMC), physical scars for closing the oxygen loop by the addition of oxygen generation and carbon dioxide reduction hardware are not included. During station restructuring, the capability for oxygen loop closure was deferred to the B-modules. As such, the ability to close the oxygen loop in the U.S. Laboratory module (LAB A) and the Habitation A module (HAB A) is contingent on the presence of the B modules. To base oxygen loop closure of SSF on the funding of the B-modules may not be desirable. Therefore, this study was requested to evaluate the necessary hooks and scars in the A-modules to facilitate closure of the oxygen loop at or subsequent to PMC. The study defines the scars for oxygen loop closure with impacts to cost, weight and volume and assesses the effects of byproduct venting. In addition, the recommended scenarios for closure with regard to topology and packaging are presented.

  11. UNDERGROUND STORAGE TANK SITE CLOSURE USING ACTIVE INTERVENTION FOR SITE CLEANUP

    EPA Science Inventory

    The Clean Air Act Amendments of 1990 mandate seasonal or year-round use of oxygenated compounds in gasoline in certain areas of the country. Methyl t-butyl ether (MtBE) has been the most commonly used oxygenate. However, the use of MtBE has created a significant risk to groundwat...

  12. HANFORD SITE RIVER CORRIDOR CLEANUP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanfordmore » river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.« less

  13. 40 CFR 267.143 - Financial assurance for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Financial assurance for closure. 267... PERMIT Financial Requirements § 267.143 Financial assurance for closure. The owner or operator must establish financial assurance for closure of each storage or treatment unit that he owns or operates. In...

  14. Safety and efficacy of excision and direct closure in acute burns surgery: outcome analysis in a prospective series of 100 patients and a survey of UK burns surgeons' attitudes.

    PubMed

    Bain, Charles J; Wang, Tim; McArthur, Gordon; Williams, Greg; Atkins, Joanne; Jones, Isabel

    2014-12-01

    Many burns surgeons avoid excision and direct closure of acute burns owing to concerns over wound dehiscence, scarring and infection. There is no evidence in the literature to support this practice. We present outcomes of a prospective series of 100 patients who underwent excision and direct closure of 138 burns over a 2-year period, along with results from a survey sent to 33 senior burns surgeons to gauge attitudes towards direct closure in burns surgery. 47% of survey respondents never perform direct closure. Dehiscence was cited as the most common concern, followed by hypertrophic scarring (HTS). In our cohort, the superficial dehiscence rate was 12% and the HTS rate was 16%, with no scarring contractures. Patients with healing time greater than 14 days were more likely to develop HTS (p=0.008), as were those with wound dehiscence (p=0.014). Patients undergoing part-grafting in addition to direct closure took significantly longer to heal than those undergoing direct closure alone (p=0.0002), with the donor site or graft delaying healing in the majority. Excision and direct closure of acute burn wounds avoids donor site morbidity and has an acceptable complication rate. It is a safe and effective treatment for full thickness burns in selected cases. Copyright © 2014 Elsevier Ltd and ISBI. All rights reserved.

  15. 40 CFR 265.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...

  16. Gravity affects the closure of the traps in Dionaea muscipula.

    PubMed

    Pandolfi, Camilla; Masi, Elisa; Voigt, Boris; Mugnai, Sergio; Volkmann, Dieter; Mancuso, Stefano

    2014-01-01

    Venus flytrap (Dionaea muscipula Ellis) is a carnivorous plant known for its ability to capture insects thanks to the fast snapping of its traps. This fast movement has been long studied and it is triggered by the mechanical stimulation of hairs, located in the middle of the leaves. Here we present detailed experiments on the effect of microgravity on trap closure recorded for the first time during a parabolic flight campaign. Our results suggest that gravity has an impact on trap responsiveness and on the kinetics of trap closure. The possible role of the alterations of membrane permeability induced by microgravity on trap movement is discussed. Finally we show how the Venus flytrap could be an easy and effective model plant to perform studies on ion channels and aquaporin activities, as well as on electrical activity in vivo on board of parabolic flights and large diameter centrifuges.

  17. Border Forces and Friction Control Epithelial Closure Dynamics

    PubMed Central

    Cochet-Escartin, Olivier; Ranft, Jonas; Silberzan, Pascal; Marcq, Philippe

    2014-01-01

    We study the closure dynamics of a large number of well-controlled circular apertures within an epithelial monolayer, where the collective cell migration responsible for epithelization is triggered by the removal of a spatial constraint rather than by scratching. Based on experimental observations, we propose a physical model that takes into account border forces, friction with the substrate, and tissue rheology. Border protrusive activity drives epithelization despite the presence of a contractile actomyosin cable at the periphery of the wound. The closure dynamics is quantified by an epithelization coefficient, defined as the ratio of protrusive stress to tissue-substrate friction, that allows classification of different phenotypes. The same analysis demonstrates a distinct signature for human cells bearing the oncogenic RasV12 mutation, demonstrating the potential of the approach to quantitatively characterize metastatic transformations. PMID:24411238

  18. Phase closure nulling: Theory and practice

    NASA Astrophysics Data System (ADS)

    Chelli, A.; Duvert, G.; Malbet, F.; Kern, P.

    2009-11-01

    We provide a complete theory of the phase closure of a binary system in which a small, feeble, and unresolved companion acts as a perturbing parameter on the spatial frequency spectrum of a dominant, bright, resolved source. We demonstrate that the influence of the companion can be measured with precision by measuring the phase closure of the system near the nulls of the primary visibility function. In these regions of phase closure nulling, frequency intervals always exist where the phase closure signature of the companion is larger than any systematic error and can thus be measured. We show that this technique allows retrieval of many astrophysically relevant properties of faint and close companions such as flux, position, and in favorable cases, spectrum. As a proof of concept, using the AMBER/VLTI instrument with 3 auxiliary telescopes of 1.8 m and only 15 minutes of on-sky integration, we detected the five magnitudes fainter companion of HD 59717 at only 3.5 stellar radii distance from the primary. This is one of the highest contrast detected by interferometry between a companion and its parent star. We conclude by a rapid study of the potentialities of phase closure nulling observations with current interferometers and explore the requirements for a new type of dedicated instrument.

  19. The Effect of Rural Hospital Closures on Community Economic Health

    PubMed Central

    Holmes, George M; Slifkin, Rebecca T; Randolph, Randy K; Poley, Stephanie

    2006-01-01

    Objective To examine the effect of rural hospital closures on the local economy. Data Sources U.S. Census Bureau, OSCAR, Medicare Cost Reports, and surveys of individuals knowledgeable about local hospital closures. Study Design Economic data at the county level for 1990–2000 were combined with information on hospital closures. The study sample was restricted to rural counties experiencing a closure during the sample period. Longitudinal regression methods were used to estimate the effect of hospital closure on per-capita income, unemployment rate, and other community economic measures. Models included both leading and lagged closure terms allowing a preclosure economic downturn as well as time for the closure to be fully realized by the community. Data Collection Information on closures was collected by contacting every state hospital association, reconciling information gathered with that contained in the American Hospital Association file and OIG reports. Principal Findings Results indicate that the closure of the sole hospital in the community reduces per-capita income by $703 (p<0.05) or 4 percent (p<0.05) and increases the unemployment rate by 1.6 percentage points (p<0.01). Closures in communities with alternative sources of hospital care had no long-term economic impact, although income decreased for 2 years following the closure. Conclusions The local economic effects of a hospital closure should be considered when regulations that affect hospitals' financial well-being are designed or changed. PMID:16584460

  20. Metal active site elasticity linked to activation of homocysteine in methionine synthases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koutmos, Markos; Pejchal, Robert; Bomer, Theresa M.

    2008-04-02

    Enzymes possessing catalytic zinc centers perform a variety of fundamental processes in nature, including methyl transfer to thiols. Cobalamin-independent (MetE) and cobalamin-dependent (MetH) methionine synthases are two such enzyme families. Although they perform the same net reaction, transfer of a methyl group from methyltetrahydrofolate to homocysteine (Hcy) to form methionine, they display markedly different catalytic strategies, modular organization, and active site zinc centers. Here we report crystal structures of zinc-replete MetE and MetH, both in the presence and absence of Hcy. Structural investigation of the catalytic zinc sites of these two methyltransferases reveals an unexpected inversion of zinc geometry uponmore » binding of Hcy and displacement of an endogenous ligand in both enzymes. In both cases a significant movement of the zinc relative to the protein scaffold accompanies inversion. These structures provide new information on the activation of thiols by zinc-containing enzymes and have led us to propose a paradigm for the mechanism of action of the catalytic zinc sites in these and related methyltransferases. Specifically, zinc is mobile in the active sites of MetE and MetH, and its dynamic nature helps facilitate the active site conformational changes necessary for thiol activation and methyl transfer.« less

  1. 50 CFR 635.28 - Fishery closures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 12 2013-10-01 2013-10-01 false Fishery closures. 635.28 Section 635.28 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE ATLANTIC HIGHLY MIGRATORY SPECIES Management Measures § 635.28 Fishery closures. (a...

  2. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, Virginia T.; Smith, Kathleen S.; Russell, Carol C.

    2007-01-01

    An important aspect of planning a new mine or mine expansion within the modern regulatory framework is to design for ultimate closure. Sampling and monitoring for closure is a form of environmental risk management. By implementing a sampling and monitoring program early in the life of the mining operation, major costs can be avoided or minimized. The costs for treating mine drainage in perpetuity are staggering, especially if they are unanticipated. The Metal Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS), a cooperative government-industry-academia organization, was established to address drainage-quality technologies of metal mining and metallurgical operations. ADTI-MMS recommends that sampling and monitoring programs consider the entire mine-life cycle and that data needed for closure of an operation be collected from exploration through postclosure.

  3. Closure versus non-closure of the peritoneum at caesarean section: short- and long-term outcomes

    PubMed Central

    Bamigboye, Anthony A; Hofmeyr, G Justus

    2014-01-01

    Background Caesarean section is a very common surgical procedure worldwide. Suturing the peritoneal layers at caesarean section may or may not confer benefit, hence the need to evaluate whether this step should be omitted or routinely performed. Objectives The objective of this review was to assess the effects of non-closure as an alternative to closure of the peritoneum at caesarean section on intraoperative and immediate- and long-term postoperative outcomes. Search methods We searched the Cochrane Pregnancy and Childbirth Group’s Trials Register (1 November 2013). Selection criteria Randomised controlled trials comparing leaving the visceral or parietal peritoneum, or both, unsutured at caesarean section with a technique which involves suturing the peritoneum in women undergoing elective or emergency caesarean section. Data collection and analysis Two review authors independently assessed trials for inclusion and risk of bias, extracted data and checked it for accuracy. Main results A total of 29 trials were included in this review and 21 trials (17,276 women) provided data that could be included in an analysis. The quality of the trials was variable. 1. Non-closure of visceral and parietal peritoneum versus closure of both parietal layers Sixteen trials involving 15,480 women, were included and analysed, when both parietal peritoneum was left unclosed versus when both peritoneal surfaces were closed. Postoperative adhesion formation was assessed in only four trials with 282 women, and no difference was found between groups (risk ratio (RR) 0.99, 95% confidence interval (CI) 0.76 to 1.29). There was significant reduction in the operative time (mean difference (MD) -5.81 minutes, 95% CI -7.68 to -3.93). The duration of hospital stay in a total of 13 trials involving 14,906 women, was also reduced (MD -0.26, 95% CI -0.47 to -0.05) days. In a trial involving 112 women, reduced chronic pelvic pain was found in the peritoneal non-closure group. 2. Non-closure of

  4. Cavity closure arrangement for high pressure vessels

    DOEpatents

    Amtmann, Hans H.

    1981-01-01

    A closure arrangement for a pressure vessel such as the pressure vessel of a high temperature gas-cooled reactor wherein a liner is disposed within a cavity penetration in the reactor vessel and defines an access opening therein. A closure is adapted for sealing relation with an annular mounting flange formed on the penetration liner and has a plurality of radially movable locking blocks thereon having outer serrations adapted for releasable interlocking engagement with serrations formed internally of the upper end of the penetration liner so as to effect high strength closure hold-down. In one embodiment, ramping surfaces are formed on the locking block serrations to bias the closure into sealed relation with the mounting flange when the locking blocks are actuated to locking positions.

  5. Comparison of cost-effectiveness and postoperative outcome of device closure and open surgery closure techniques for treatment of patent ductus arteriosus.

    PubMed

    Ahmadi, Alireza; Sabri, Mohammadreza; Bigdelian, Hamid; Dehghan, Bahar; Gharipour, Mojgan

    2014-01-01

    Various devices have been recently employed for percutaneous closure of the patent ductus arteriosus (PDA). Although the high effectiveness of device closure techniques has been clearly determined, a few studies have focused on the cost-effectiveness and also postoperative complications of these procedures in comparison with open surgery. The present study aimed to evaluate the clinical outcome and cost-effectiveness of PDA occlusion by Amplatzer and coil device in comparisong with open surgery. In this cross-sectional study, a randomized sample of 201 patients aged 1 month to 16 years (105 patients with device closure and 96 patients with surgical closure) was selected. The ratio of total pulmonary blood flow to total systemic blood flow, the Qp/Qs ratio, was measured using a pulmonary artery catheter. The cost analysis included direct medical care costs associated with device implantation and open surgery, as well as professional fees. All costs were calculated in Iranian Rials and then converted to US dollars. There was no statistical difference in mean Qp/Qs ratio before the procedure between the device closure group and the open surgery group (2.1 ± 0.7 versus 1.7 ± 0.6, P = 0.090). The mean measured costs were overall higher in the device closure group than in open closure group (948.87 ± 548.76 US$ versus 743.70 ± 696.91 US$, P < 0.001). This difference remained significant after adjustment for age and gender (Standardized Beta = 0.160, P = 0.031). PDA closure with the Amplatzer ductal occluder (1053.05 ± 525.73 US$) or with Nit-Occlud coils (PFM) (912.73 ± 565.94 US$, P < 0.001) was more expensive than that via open surgery. However, the Cook detachable spring coils device closure (605.65 ± 194.62 US$, P = 0.650) had a non-significant cost difference with open surgery. No event was observed in the device closure group regarding in-hospital mortality or morbidity; however, in another group, 2 in-hospital deaths occurred, two patients experienced

  6. Mass extraction container closure integrity physical testing method development for parenteral container closure systems.

    PubMed

    Yoon, Seung-Yil; Sagi, Hemi; Goldhammer, Craig; Li, Lei

    2012-01-01

    Container closure integrity (CCI) is a critical factor to ensure that product sterility is maintained over its entire shelf life. Assuring the CCI during container closure (C/C) system qualification, routine manufacturing and stability is important. FDA guidance also encourages industry to develop a CCI physical testing method in lieu of sterility testing in a stability program. A mass extraction system has been developed to check CCI for a variety of container closure systems such as vials, syringes, and cartridges. Various types of defects (e.g., glass micropipette, laser drill, wire) were created and used to demonstrate a detection limit. Leakage, detected as mass flow in this study, changes as a function of defect length and diameter. Therefore, the morphology of defects has been examined in detail with fluid theories. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water, placebo, or drug product (3 mg/mL concentration) solution. Also, it has been verified that the method was robust, and capable of determining the acceptance limit using 3σ for syringes and 6σ for vials. Sterile products must maintain their sterility over their entire shelf life. Container closure systems such as those found in syringes and vials provide a seal between rubber and glass containers. This seal must be ensured to maintain product sterility. A mass extraction system has been developed to check container closure integrity for a variety of container closure systems such as vials, syringes, and cartridges. In order to demonstrate the method's capability, various types of defects (e.g., glass micropipette, laser drill, wire) were created in syringes and vials and were tested. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water

  7. Nicotinamide Cofactors Suppress Active-Site Labeling of Aldehyde Dehydrogenases.

    PubMed

    Stiti, Naim; Chandrasekar, Balakumaran; Strubl, Laura; Mohammed, Shabaz; Bartels, Dorothea; van der Hoorn, Renier A L

    2016-06-17

    Active site labeling by (re)activity-based probes is a powerful chemical proteomic tool to globally map active sites in native proteomes without using substrates. Active site labeling is usually taken as a readout for the active state of the enzyme because labeling reflects the availability and reactivity of active sites, which are hallmarks for enzyme activities. Here, we show that this relationship holds tightly, but we also reveal an important exception to this rule. Labeling of Arabidopsis ALDH3H1 with a chloroacetamide probe occurs at the catalytic Cys, and labeling is suppressed upon nitrosylation and oxidation, and upon treatment with other Cys modifiers. These experiments display a consistent and strong correlation between active site labeling and enzymatic activity. Surprisingly, however, labeling is suppressed by the cofactor NAD(+), and this property is shared with other members of the ALDH superfamily and also detected for unrelated GAPDH enzymes with an unrelated hydantoin-based probe in crude extracts of plant cell cultures. Suppression requires cofactor binding to its binding pocket. Labeling is also suppressed by ALDH modulators that bind at the substrate entrance tunnel, confirming that labeling occurs through the substrate-binding cavity. Our data indicate that cofactor binding adjusts the catalytic Cys into a conformation that reduces the reactivity toward chloroacetamide probes.

  8. Transitive closure of subsumption and causal relations in a large ontology of radiological diagnosis.

    PubMed

    Kahn, Charles E

    2016-06-01

    The Radiology Gamuts Ontology (RGO)-an ontology of diseases, interventions, and imaging findings-was developed to aid in decision support, education, and translational research in diagnostic radiology. The ontology defines a subsumption (is_a) relation between more general and more specific terms, and a causal relation (may_cause) to express the relationship between disorders and their possible imaging manifestations. RGO incorporated 19,745 terms with their synonyms and abbreviations, 1768 subsumption relations, and 55,558 causal relations. Transitive closure was computed iteratively; it yielded 2154 relations over subsumption and 1,594,896 relations over causality. Five causal cycles were discovered, all with path length of no more than 5. The graph-theoretic metrics of in-degree and out-degree were explored; the most useful metric to prioritize modification of the ontology was found to be the product of the in-degree of transitive closure over subsumption and the out-degree of transitive closure over causality. Two general types of error were identified: (1) causal assertions that used overly general terms because they implicitly assumed an organ-specific context and (2) subsumption relations where a site-specific disorder was asserted to be a subclass of the general disorder. Transitive closure helped identify incorrect assertions, prioritized and guided ontology revision, and aided resources that applied the ontology's knowledge. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Laryngeal closure impedes non-invasive ventilation at birth.

    PubMed

    Crawshaw, Jessica R; Kitchen, Marcus J; Binder-Heschl, Corinna; Thio, Marta; Wallace, Megan J; Kerr, Lauren T; Roehr, Charles C; Lee, Katie L; Buckley, Genevieve A; Davis, Peter G; Flemmer, Andreas; Te Pas, Arjan B; Hooper, Stuart B

    2018-03-01

    Non-invasive ventilation is sometimes unable to provide the respiratory needs of very premature infants in the delivery room. While airway obstruction is thought to be the main problem, the site of obstruction is unknown. We investigated whether closure of the larynx and epiglottis is a major site of airway obstruction. We used phase contrast X-ray imaging to visualise laryngeal function in spontaneously breathing premature rabbits immediately after birth and at approximately 1 hour after birth. Non-invasive respiratory support was applied via a facemask and images were analysed to determine the percentage of the time the glottis and the epiglottis were open. Immediately after birth, the larynx is predominantly closed, only opening briefly during a breath, making non-invasive intermittent positive pressure ventilation (iPPV) ineffective, whereas after lung aeration, the larynx is predominantly open allowing non-invasive iPPV to ventilate the lung. The larynx and epiglottis were predominantly closed (open 25.5%±1.1% and 17.1%±1.6% of the time, respectively) in pups with unaerated lungs and unstable breathing patterns immediately after birth. In contrast, the larynx and the epiglottis were mostly open (90.5%±1.9% and 72.3%±2.3% of the time, respectively) in pups with aerated lungs and stable breathing patterns irrespective of time after birth. Laryngeal closure impedes non-invasive iPPV at birth and may reduce the effectiveness of non-invasive respiratory support in premature infants immediately after birth. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  10. No evidence that manual closure of the bronchial stump has a lower failure rate than mechanical stapler closure following anatomical lung resection.

    PubMed

    Zakkar, Mustafa; Kanagasabay, Robin; Hunt, Ian

    2014-04-01

    A best evidence topic in cardiothoracic surgery was written according to a structured protocol. The question addressed was whether manual closure of the bronchial stump is safer with lower failure rates than mechanical closure using a stapling device following anatomical lung resection. One hundred and twenty-nine papers were identified using the search below. Eight papers presented the best evidence to answer the clinical question as they included sufficient number of patients to reach conclusions regarding the issues of interest for this review. Complications, complication rates and operation time were included in the assessment. The author, journal, date and country of publication, patient group studied, study type, relevant outcomes, results and study weaknesses of the papers are tabulated. When looking at manual vs mechanical staples, it was noted that stapler failure can occur in around 4% of cases. The rate of bronchopleural fistula (BPF) development varied more in patients who underwent manual closure (1.5-12.5%) than in patients who underwent mechanical closure (1-5.7%). Although most of the studies reviewed showed no statistical differences between manual and mechanical closure in terms of BPF development, one study, however, showed that manual closure was significantly associated with lower numbers of postoperative BPF, while another study showed that mechanical closure is significantly associated with lower incidence of BPF. When looking at the role of the learning curve and training opportunities, it seems that the surgeon's inexperience when using mechanical staples can contribute to BPF development. A surgeon's experience can play a major role in the prevention of BPF development in patients having manual closure. Manual closure can provide a cheap and reliable technique when compared with costs incurred from using staplers, it is applicable in all situations and can be taught to surgeons in training with an acceptable risk. However, there is a lack

  11. No evidence that manual closure of the bronchial stump has a lower failure rate than mechanical stapler closure following anatomical lung resection

    PubMed Central

    Zakkar, Mustafa; Kanagasabay, Robin; Hunt, Ian

    2014-01-01

    A best evidence topic in cardiothoracic surgery was written according to a structured protocol. The question addressed was whether manual closure of the bronchial stump is safer with lower failure rates than mechanical closure using a stapling device following anatomical lung resection. One hundred and twenty-nine papers were identified using the search below. Eight papers presented the best evidence to answer the clinical question as they included sufficient number of patients to reach conclusions regarding the issues of interest for this review. Complications, complication rates and operation time were included in the assessment. The author, journal, date and country of publication, patient group studied, study type, relevant outcomes, results and study weaknesses of the papers are tabulated. When looking at manual vs mechanical staples, it was noted that stapler failure can occur in around 4% of cases. The rate of bronchopleural fistula (BPF) development varied more in patients who underwent manual closure (1.5–12.5%) than in patients who underwent mechanical closure (1–5.7%). Although most of the studies reviewed showed no statistical differences between manual and mechanical closure in terms of BPF development, one study, however, showed that manual closure was significantly associated with lower numbers of postoperative BPF, while another study showed that mechanical closure is significantly associated with lower incidence of BPF. When looking at the role of the learning curve and training opportunities, it seems that the surgeon's inexperience when using mechanical staples can contribute to BPF development. A surgeon's experience can play a major role in the prevention of BPF development in patients having manual closure. Manual closure can provide a cheap and reliable technique when compared with costs incurred from using staplers, it is applicable in all situations and can be taught to surgeons in training with an acceptable risk. However, there is a

  12. Quantum mechanical design of enzyme active sites.

    PubMed

    Zhang, Xiyun; DeChancie, Jason; Gunaydin, Hakan; Chowdry, Arnab B; Clemente, Fernando R; Smith, Adam J T; Handel, T M; Houk, K N

    2008-02-01

    The design of active sites has been carried out using quantum mechanical calculations to predict the rate-determining transition state of a desired reaction in presence of the optimal arrangement of catalytic functional groups (theozyme). Eleven versatile reaction targets were chosen, including hydrolysis, dehydration, isomerization, aldol, and Diels-Alder reactions. For each of the targets, the predicted mechanism and the rate-determining transition state (TS) of the uncatalyzed reaction in water is presented. For the rate-determining TS, a catalytic site was designed using naturalistic catalytic units followed by an estimation of the rate acceleration provided by a reoptimization of the catalytic site. Finally, the geometries of the sites were compared to the X-ray structures of related natural enzymes. Recent advances in computational algorithms and power, coupled with successes in computational protein design, have provided a powerful context for undertaking such an endeavor. We propose that theozymes are excellent candidates to serve as the active site models for design processes.

  13. Novel percutaneous suture-mediated patent foramen ovale closure technique. Early results of the NobleStitch EL Italian Registry.

    PubMed

    Gaspardone, Achille; De Marco, Federico; Sgueglia, Gregory A; De Santis, Antonella; Iamele, Maria; D'Ascoli, Emanuela; Tusa, Maurizio; Corciu, Anca; Mullen, Michael; Nobles, Anthony; Carminati, Mario; Bedogni, Francesco

    2018-04-03

    To assess the efficacy of a novel percutaneous "device-less" suture mediated patent foramen ovale (PFO) closure system. Between June 2016 and October 2017, a prospective registry aimed at assessing the safety and efficacy of the NobleStitch EL (HeartStitch, Fountain Valley, CA) suture-based PFO closure system was carried out at 12 sites in Italy. Among 200 consecutive evaluated patients, 192 were considered suitable for suture-mediated PFO closure (44±13 years, 114 women). Suture of the septum with the NobleStitch EL system was carried out successfully in 186 (96%) patients. Median fluoroscopy time was 16.1 (13.0-22.5) minutes and contrast volume 200 (150-270) ml. At 206±130 days follow-up, microbubbles transthoracic echocardiography with Valsalva maneuver revealed no RLS (grade 0) in 139 (75%) patients and RLS grade ≤1 in 166 (89%) patients. Significant RLS was present in 20 (11%) patients (grade 2 and 3 in 11 and 9 patients, respectively). There were no device-related complications. The early results of this first Italian Registry indicates that the suture mediated "deviceless" closure of PFO is feasible in the majority of septal anatomies, provides an effective closure of PFO comparable to traditional devices with an excellent safety profile at medium term follow-up.

  14. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  15. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  16. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  17. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  18. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  19. 50 CFR 635.28 - Fishery closures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... closure, NMFS will also take into consideration the criteria specified in § 635.27(a)(8). (b) Sharks—(1... this section, when NMFS calculates that the landings for the shark species management group, as... of closure for that shark species, shark management group, and/or region that will be effective no...

  20. Subcostal closure technique for prevention of postthoracotomy pain syndrome.

    PubMed

    Hong, Kipyo; Bae, Mikyung; Han, Sora

    2016-09-01

    The purpose of this study was to evaluate the efficacy of our subcostal closure technique in prevention of postthoracotomy pain syndrome. From July 2012 to March 2015, 29 patients in whom a lobectomy was indicated underwent a thoracotomy. The thoracotomy wounds were closed using a subcostal closure technique (subcostal closure group) and outcomes were compared with 31 patients who underwent video-assisted thoracoscopic surgery (thoracoscopy group). The duration of oral opioid consumption was evaluated from medical records, and postoperative pain was evaluated by telephone interview conducted by a trained nurse practitioner who was unaware of the patient's group. Pain scores were higher in the thoracoscopy group compared to the subcostal closure group, reaching statistical significance (Numeric Rating Scale 0.55 ± 0.948 in the subcostal closure group vs. 1.84 ± 1.614 in the thoracoscopy group; p < 0.001, Clinical Pain Scale 0.24 ± 0.435 in the subcostal closure group vs. 0.81 ± 0.703 in the thoracoscopy group; p < 0.001). The number of patients who consumed oral opioids for longer than 2 months after the operation was significantly greater in the thoracoscopy group than the subcostal closure group (6.9% in the subcostal closure group vs. 32.3% in the thoracoscopy group; p = 0.022). The subcostal closure technique is useful to prevent postthoracotomy pain syndrome. © The Author(s) 2016.

  1. Particulate contamination from siliconized rubber closures for freeze drying.

    PubMed

    Gebhardt, U; Grumbridge, N A; Knoch, A

    1996-01-01

    It can be shown that siliconized closures for freeze drying may cause the opalescence and turbidity observed in freeze-dried products after reconstitution. Closures of different rubber composition show different intensities of turbidity when treated identically with the same quantity and type of silicone oil. Clear solutions are obtained after reconstitution if ETFE-coated closures are used instead of siliconized closures. Samples stored at 4 degrees C for up to 6 months show no change in the intensity of turbidity, while the turbidity of samples manufactured with siliconized closures and stored at higher temperatures increase with time. Samples with ETFE-coated closures show clear solutions when stored at 25 degrees C and 37 degrees C for up to 6 months and at 45 degrees C for 3 months. After 6 months only a very weak opalescence could be observed in these samples.

  2. Systematization of a set of closure techniques.

    PubMed

    Hausken, Kjell; Moxnes, John F

    2011-11-01

    Approximations in population dynamics are gaining popularity since stochastic models in large populations are time consuming even on a computer. Stochastic modeling causes an infinite set of ordinary differential equations for the moments. Closure models are useful since they recast this infinite set into a finite set of ordinary differential equations. This paper systematizes a set of closure approximations. We develop a system, which we call a power p closure of n moments, where 0≤p≤n. Keeling's (2000a,b) approximation with third order moments is shown to be an instantiation of this system which we call a power 3 closure of 3 moments. We present an epidemiological example and evaluate the system for third and fourth moments compared with Monte Carlo simulations. Copyright © 2011 Elsevier Inc. All rights reserved.

  3. The etiology and determinants of hospital closure.

    PubMed

    Longo, D R; Sohn, M W; Shortell, S M

    1996-01-01

    This article examines the etiology of hospital closure and the correlates of hospital closure and the extent of similarity in this organizational outcome between pre- and post-Prospective Payment System (PPS) implementation. It also replicates a study from an earlier time period. Findings support the study's main hypotheses: in more stringent and turbulent markets, institutional and strategic variables are more important determinants of hospital closure. Merger acquisitions are found to be similar to both system acquisitions and autonomous hospitals. Standard Metropolitan Statistical Area (SMSA) status and regulation show an effect on hospital closure and merger acquisition. While many similarities exist when compared to the replicated study and findings prior to PPS implementation, it appears that sufficient differences exist to support the hypothesis that the PPS has an impact upon hospital organizational outcome.

  4. Evaluation of Container Closure System Integrity for Frozen Storage Drug Products.

    PubMed

    Nieto, Alejandra; Roehl, Holger; Brown, Helen; Nikoloff, Jonas; Adler, Michael; Mahler, Hanns-Christian

    2016-01-01

    Sometimes, drug product for parenteral administration is stored in a frozen state (e.g., -20 °C or -80 °C), particularly during early stages of development of some biotech molecules in order to provide sufficient stability. Shipment of frozen product could potentially be performed in the frozen state, yet possibly at different temperatures, for example, using dry ice (-80 °C). Container closure systems of drug products usually consist of a glass vial, rubber stopper, and an aluminum crimped cap. In the frozen state, the glass transition temperature (Tg) of commonly used rubber stoppers is between -55 and -65 °C. Below their Tg, rubber stoppers are known to lose their elastic properties and become brittle, and thus potentially fail to maintain container closure integrity in the frozen state. Leaks during frozen temperature storage and transportation are likely to be transient, yet, can possibly risk container closure integrity and lead to microbial contamination. After thawing, the rubber stopper is supposed to re-seal the container closure system. Given the transient nature of the possible impact on container closure integrity in the frozen state, typical container closure integrity testing methods (used at room temperature conditions) are unable to evaluate and thus confirm container closure integrity in the frozen state. Here we present the development of a novel method (thermal physical container closure integrity) for direct assessment of container closure integrity by a physical method (physical container closure integrity) at frozen conditions, using a modified He leakage test. In this study, different container closure systems were evaluated with regard to physical container closure integrity in the frozen state to assess the suitability of vial/stopper combinations and were compared to a gas headspace method. In summary, the thermal physical container closure integrity He leakage method was more sensitive in detecting physical container closure

  5. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve

  6. DNAPL Remediation: Selected Projects Approaching Regulatory Closure

    EPA Pesticide Factsheets

    This paper is a status update on the use of DNAPL source reduction remedial technologies, and provides information about recent projects where regulatory closure has been reached or projects are approaching regulatory closure, following source reduction.

  7. 488-4D ASH LANDFILL CLOSURE CAP HELP MODELING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phifer, M.

    At the request of Area Completion Projects (ACP) in support of the 488-4D Landfill closure, the Savannah River National Laboratory (SRNL) has performed Hydrologic Evaluation of Landfill Performance (HELP) modeling of the planned 488-4D Ash Landfill closure cap to ensure that the South Carolina Department of Health and Environmental Control (SCDHEC) limit of no more than 12 inches of head on top of the barrier layer (saturated hydraulic conductivity of no more than 1.0E-05 cm/s) in association with a 25-year, 24-hour storm event is not projected to be exceeded. Based upon Weber 1998 a 25-year, 24-hour storm event at themore » Savannah River Site (SRS) is 6.1 inches. The results of the HELP modeling indicate that the greatest peak daily head on top of the barrier layer (i.e. geosynthetic clay liner (GCL) or high density polyethylene (HDPE) geomembrane) for any of the runs made was 0.079 inches associated with a peak daily precipitation of 6.16 inches. This is well below the SCDHEC limit of 12 inches.« less

  8. Impact of High Seas Closure on Food Security in Low Income Fish Dependent Countries

    PubMed Central

    Teh, Louise S. L.; Lam, Vicky W. Y.; Cheung, William W. L.; Miller, Dana; Teh, Lydia C. L.; Sumaila, U. Rashid

    2016-01-01

    We investigate how high seas closure will affect the availability of commonly consumed food fish in 46 fish reliant, and/or low income countries. Domestic consumption of straddling fish species (fish that would be affected by high seas closure) occurred in 54% of the assessed countries. The majority (70%) of countries were projected to experience net catch gains following high seas closure. However, countries with projected catch gains and that also consumed the straddling fish species domestically made up only 37% of the assessed countries. In contrast, much fewer countries (25%) were projected to incur net losses from high seas closure, and of these, straddling species were used domestically in less than half (45%) of the countries. Our findings suggest that, given the current consumption patterns of straddling species, high seas closure may only directly benefit the supply of domestically consumed food fish in a small number of fish reliant and/or low income countries. In particular, it may not have a substantial impact on improving domestic fish supply in countries with the greatest need for improved access to affordable fish, as only one third of this group used straddling fish species domestically. Also, food security in countries with projected net catch gains but where straddling fish species are not consumed domestically may still benefit indirectly via economic activities arising from the increased availability of non-domestically consumed straddling fish species following high seas closure. Consequently, this study suggests that high seas closure can potentially improve marine resource sustainability as well as contribute to human well-being in some of the poorest and most fish dependent countries worldwide. However, caution is required because high seas closure may also negatively affect fish availability in countries that are already impoverished and fish insecure. PMID:28033359

  9. Impact of High Seas Closure on Food Security in Low Income Fish Dependent Countries.

    PubMed

    Teh, Louise S L; Lam, Vicky W Y; Cheung, William W L; Miller, Dana; Teh, Lydia C L; Sumaila, U Rashid

    2016-01-01

    We investigate how high seas closure will affect the availability of commonly consumed food fish in 46 fish reliant, and/or low income countries. Domestic consumption of straddling fish species (fish that would be affected by high seas closure) occurred in 54% of the assessed countries. The majority (70%) of countries were projected to experience net catch gains following high seas closure. However, countries with projected catch gains and that also consumed the straddling fish species domestically made up only 37% of the assessed countries. In contrast, much fewer countries (25%) were projected to incur net losses from high seas closure, and of these, straddling species were used domestically in less than half (45%) of the countries. Our findings suggest that, given the current consumption patterns of straddling species, high seas closure may only directly benefit the supply of domestically consumed food fish in a small number of fish reliant and/or low income countries. In particular, it may not have a substantial impact on improving domestic fish supply in countries with the greatest need for improved access to affordable fish, as only one third of this group used straddling fish species domestically. Also, food security in countries with projected net catch gains but where straddling fish species are not consumed domestically may still benefit indirectly via economic activities arising from the increased availability of non-domestically consumed straddling fish species following high seas closure. Consequently, this study suggests that high seas closure can potentially improve marine resource sustainability as well as contribute to human well-being in some of the poorest and most fish dependent countries worldwide. However, caution is required because high seas closure may also negatively affect fish availability in countries that are already impoverished and fish insecure.

  10. 40 CFR 280.70 - Temporary closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (UST) Out-of-Service UST Systems and Closure § 280.70 Temporary closure. (a) When an UST system is... the UST system is empty. The UST system is empty when all materials have been removed using commonly... the total capacity of the UST system, remain in the system. (b) When an UST system is temporarily...

  11. 40 CFR 280.70 - Temporary closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (UST) Out-of-Service UST Systems and Closure § 280.70 Temporary closure. (a) When an UST system is... the UST system is empty. The UST system is empty when all materials have been removed using commonly... the total capacity of the UST system, remain in the system. (b) When an UST system is temporarily...

  12. 40 CFR 280.70 - Temporary closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (UST) Out-of-Service UST Systems and Closure § 280.70 Temporary closure. (a) When an UST system is... the UST system is empty. The UST system is empty when all materials have been removed using commonly... the total capacity of the UST system, remain in the system. (b) When an UST system is temporarily...

  13. 40 CFR 280.70 - Temporary closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (UST) Out-of-Service UST Systems and Closure § 280.70 Temporary closure. (a) When an UST system is... the UST system is empty. The UST system is empty when all materials have been removed using commonly... the total capacity of the UST system, remain in the system. (b) When an UST system is temporarily...

  14. 40 CFR 280.70 - Temporary closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (UST) Out-of-Service UST Systems and Closure § 280.70 Temporary closure. (a) When an UST system is... the UST system is empty. The UST system is empty when all materials have been removed using commonly... the total capacity of the UST system, remain in the system. (b) When an UST system is temporarily...

  15. Crack closure on rehydration of glass-ionomer materials.

    PubMed

    Sidhu, Sharanbir K; Pilecki, Peter; Sherriff, Martyn; Watson, Timothy F

    2004-10-01

    Moisture-sensitivity of immature glass-ionomer cements suggests that hydration-induced volumetric expansion might close and potentially heal established cracks. Crack closure in glass-ionomer cements (GICs) was observed following rehydration. Circular cavities were prepared in 15 teeth: 10 were restored with resin-modified GICs (5 with Fuji II LC and 5 with Photac-Fil) and 5 were restored with a conventional GIC (Fuji IX); all were dehydrated for 1 min with air and imaged immediately by confocal microscopy. Crack formation in each was located, after which water was placed on the surface and observed for 15 min via a CCD camera. Dehydration caused cracks with measurable gaps, while rehydration resulted in varying degrees of closure: closure was limited in the conventional GIC, and complete or near complete along part/s of the crack in the resin-modified GICs. In all, closure movement became imperceptible after the first 10 min. Statistical analysis indicated no significant difference between the closure behavior of all materials. However, the resin-modified GICs appeared to show a greater potential for closure of established cracks than the conventional GIC upon rehydration.

  16. The Impact of Turtle Excluder Devices and Fisheries Closures on Loggerhead and Kemp's Ridley Strandings in the Western Gulf of Mexico

    USGS Publications Warehouse

    Lewison, R.L.; Crowder, L.B.; Shaver, D.J.

    2003-01-01

    The Sea Turtle Stranding and Salvage Network has been monitoring turtle strandings for more than 20 years in the United States. High numbers of strandings in the early to mid-1980s prompted regulations to require turtle excluder devices (TEDs) on shrimping vessels (trawlers). Following year-round TED implementation in 1991, however, stranding levels in the Gulf of Mexico increased. We evaluated the efficacy of TEDs and other management actions (e.g., fisheries closures) on loggerhead (Caretta caretta) and Kemp's ridley (Lepidochelys kempii) turtle populations by analyzing a long-term, stranding data set from the western Gulf of Mexico. Our analyses suggest that both sea turtle population growth and shrimping activity have contributed to the observed increase in strandings. Compliance with regulations requiring turtle excluder devices was a significant factor in accounting for annual stranding variability: low compliance was correlated with high levels of strandings. Our projections suggest that improved compliance with TED regulations will reduce strandings to levels that, in conjunction with other protective measures, should promote population recoveries for loggerhead and Kemp's ridley turtles. Local, seasonal fisheries closures, concurrent with TED enforcement, could reduce strandings to even lower levels. A seasonal closure adjacent to a recently established Kemp's ridley nesting beach may also reduce mortality of nesting adults and thus promote long-term population persistence by fostering the establishment of a robust secondary nesting site.

  17. Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated

  18. Mechanics of Wound Closure: Emerging Tape-Based Wound Closure Technology vs. Traditional Methods.

    PubMed

    Levi, Kemal; Ichiryu, Kei; Kefel, Pelin; Keller, Juergen; Grice, Jon; Belson, Ori; Storne, Eric; Safa, Bauback

    2016-10-12

    To date, there is still a lack of understanding of how wound closure methods perform comparatively under daily bodily movement during the course of healing and how they affect the mechanics of healing. The present study is a first step in understanding and objectively quantifying the gap. The study provides both a new method of metrology for noninvasive evaluation of skin mechanics at the onset of wound healing and an emerging tape-based wound closure technology. The latter shows better performance with respect to commonly used staples and sutures, holding the wound intact and providing uniform mechanical support across the incision.

  19. A nonlocal fluid closure for antiparallel reconnection

    NASA Astrophysics Data System (ADS)

    Ng, J.; Hakim, A.; Bhattacharjee, A.

    2016-12-01

    The integration of kinetic effects in fluid models is an important problem in global simulations of the Earth's magnetosphere and space weather modelling. In particular, it has been shown that ion kinetics play an important role in the dynamics of large reconnecting systems, and that fluid models can account of some of these effects[1,2] . Here we introduce a new fluid model and closure for collisionless magnetic reconnection and more general applications. Taking moments of the kinetic equation, we evolve the full pressure tensor for electrons and ions, which includes the off diagonal terms necessary for reconnection. Kinetic effects are recovered by using a nonlocal heat flux closure, which approximates linear Landau damping in the fluid framework [3]. Using the island coalescence problem as a test, we show how the nonlocal ion closure improves on the typical collisional closures used for ten-moment models and circumvents the need for a colllisional free parameter. Finally, we extend the closure to study guide-field reconnection and discuss the implementation of a twenty-moment model.[1] A. Stanier et al. Phys Rev Lett (2015)[2] J. Ng et al. Phys Plasmas (2015)[3] G. Hammett et al. Phys Rev Lett (1990)

  20. ICPP tank farm closure study. Volume 2: Engineering design files

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-02-01

    Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-groutedmore » polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.« less