Sample records for active umtra project

  1. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beranich, S.J.

    1994-08-24

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less

  2. UMTRA project list of reportable occurrences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, aremore » omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.« less

  3. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the applicationmore » of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.« less

  5. Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2002-11-29

    The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less

  7. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less

  8. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less

  9. Long-term surveillance plan for the Green River, Utah, disposal site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-06-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and detailsmore » how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).« less

  10. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  11. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  12. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  13. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States andmore » details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.« less

  14. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  15. Department of Energy PEIS scoping session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badar, L

    1992-12-10

    This is the second programmatic environmental impact statement scoping session held in Durango, Colorado. The purpose was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get Durango community's input. Scoping is the collection of information and getting everyone involved and really making a team out of coming up with a proposed action. This report contains the presentations made by the project manager for the Uranium Mill Tailings (UMTRA) program, site manager for the Durango UMTRA site, manager of ground water hydrology, and include comments made by local residents.

  16. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, D.E.

    This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases.

  18. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    For the UMTRA Project site located near Durango, Colorado (the Durango site), the Surface Project cleanup occurred from 1986 to 1991. An evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people`s health. Exposure could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. In addition, environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has mixed with contaminated ground water. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Projectmore » at the Durango site. The results of this report and further site characterization of the Durango site will be used to determine what is necessary to protect public health and the environment, and to comply with the EPA standards.« less

  19. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonablemore » effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in accordance with the final standards. The EPA reserves the right to modify the ground water standards, if necessary, based on changes in EPA drinking water standards. Appendix A contains a copy of the 1983 EPA ground water compliance standards, the 1987 proposed changes to the standards, and the 1995 final rule. Under UMTRA, DOE is responsible for bringing the designated processing sites into compliance with the EPA ground water standards and complying with all other applicable standards and requirements. The U.S. Nuclear Regulatory Commission (NRC) must concur with DOE's actions. States are full participants in the process. The DOE also must consult with any affected Indian tribes and the Bureau of Indian Affairs. Uranium processing activities at most of the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as but not limited to uranium and nitrates. The purpose of the UMTRA Ground Water Project is to eliminate or reduce to acceptable levels the potential health and environmental consequences of milling activities by meeting the EPA ground water standards.« less

  20. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determinemore » what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.« less

  1. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  2. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-02-01

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptablemore » regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  3. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-12-31

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment - various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ tomore » acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field preliminary results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  4. Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community`s input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents.

  5. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided.

  6. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project,more » as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.« less

  7. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  8. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  10. Bioremediation of Uranium-Contaminated Groundwater using Engineered Injection and Extraction

    NASA Astrophysics Data System (ADS)

    Greene, J. A.; Neupauer, R.; Ye, M.; Kasprzyk, J. R.; Mays, D. C.; Curtis, G. P.

    2017-12-01

    During in-situ remediation of contaminated groundwater, a treatment chemical is injected into the contaminated groundwater to react with and degrade the contaminant, with reactions occurring where the treatment chemical contacts the contaminant. Traditional in-situ groundwater remediation relies on background groundwater flow for spreading of treatment chemicals into contaminant plumes. Engineered Injection and Extraction (EIE), in which time-varying induced flow fields are used to actively spread the treatment chemical into the contaminant plume, has been developed to increase contact between the contaminant and treatment chemical, thereby enhancing contaminant degradation. EIE has been investigated for contaminants that degrade through irreversible bimolecular reaction with a treatment chemical, but has not been investigated for a contaminant governed by reversible reactions. Uranium primarily occurs in its aqueous, mobile form, U(VI), in the environment but can be bioreduced to its sparingly soluble, immobile form, U(IV), by iron reducing bacteria stimulated by an acetate amendment. In this study, we investigate the ability of EIE to facilitate and sustain favorable conditions to immobilize uranium during remediation, and to prevent re-mobilization of uranium into the aqueous phase after active remediation has ended. Simulations in this investigation are conducted using a semi-synthetic model based on physical and chemical conditions at the Naturita Uranium Mill Tailings Remedial Action (UMTRA) site in southwestern Colorado and the Old Rifle UMTRA site in western Colorado. The EIE design is optimized for the synthetic model using the Borg multi-objective evolutionary algorithm.

  11. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequatelymore » attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.« less

  12. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  13. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less

  14. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  15. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Dave; Miller, David; Kautsky, Mark

    A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoingmore » activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.« less

  17. Geochemical investigation of UMTRAP designated site at Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Markos, G.; Bush, K.J.

    1983-09-01

    This report is the result of a geochemical investigation of the former uranium mill and tailings site at Durango, Colorado. This is one in a series of site specific geochemical investigations performed on the inactive uranium mill tailings included in the UMTRA Project. The objectives of the investigation are to characterize the geochemistry, to determine the contaminant distribution resulting from the former milling activities and tailings, and to infer chemical pathways and transport mechanisms from the contaminant distribution. The results will be used to model contaminant migration and to develop criteria for long-term containment media such as a cover systemmore » which is impermeable to contaminant migration. This report assumes a familiarity with the hydrologic conditions of the site and the geochemical concepts underlying the investigation. The results reported are based on a one-time sampling of waters and solid material from the background, the area adjacent to the site, and the site. The solid samples are water extracted remove easily soluble salts and acids extracted to remove cabonates and hydroxides. The water extracts and solid samples were analyzed for the major and trace elements. A limited number of samples were analyzed for radiological components. The report includes the methods of sampling, sample processing, analysis, and data interpretation. Three major conclusions are: (1) carbonate salts and low TDS characterize the tailings; (2) the adjacent area and raffinate ponds contain contaminants deposited by a single event of fluid permeation of the soils; and (3) the Animas River adjacent to the site has elevated gross alpha activity attributed to /sup 226/Ra in the sediments derived from the tailings or milling activities.« less

  18. Synchrotron X-ray characterization of mackinawite and uraninite relevant to bio-remediation of groundwater contaminated with uranium

    NASA Astrophysics Data System (ADS)

    Carpenter, J.; Hyun, S.; Hayes, K. F.

    2010-12-01

    Uranium (U) originating from mining operations for weapon manufacturing and nuclear energy production is a significant radionuclide contaminant in groundwater local to uranium mining, uranium milling, and uranium mill tailing (UMT) storage sites. In the USA, the Department of Energy (DOE) is currently overseeing approximately 24 Uranium Mill Tailing Remediation Action (UMTRA) sites which have collectively processed over 27 million tons of uranium ore1,2. In-Situ microbial bio-reduction of the highly mobile U6+ ion into the dramatically less mobile U4+ ion has been demonstrated as an effective remedial process to inhibit uranium migration in the aqueous phase3. The resistance of this process to oxidization and possible remobilization of U when bioremediation stops (and oxidants such as oxygen from the air or nitrate in water diffuse into the formation) in the long term is not known. UMTRA site studies3 have shown that iron sulfide solids are produced by sulfate reducing bacteria (SRB) during U bioremediation, and some forms of these iron sulfide solids are known to be effective oxidant scavengers, potentially protecting against re-oxidation and thus remobilization of U. This work is investigating the role of iron sulfide solids in the long-term immobilization of reduced U compounds after bioremediation is completed in groundwater local to UMTRA sites. Re-oxidation tests are being performed in packed media columns loaded with both FeS and U solids. High quality mackinawite (FeS), and uraninite (UO2) have been synthesized in our laboratory via a wet chemistry approach. These synthetic materials are expected to mimic the naturally occurring and biogenic materials present in biologically stimulated UMTRA sites. In order to establish the initial conditions of the prepared experimental columns and to compare synthetic and biogenic FeS and UO2, these synthesized materials have been characterized with synchrotron radiation at the Stanford Synchrotron Radiation Lightsource using synchrotron x-ray powder diffraction (SXRD) and extended x-ray absorption fine structure (EXAFS). SXRD data were collected and analyzed with profile fitting to determine lattice parameters and crystallite size for comparison with published values for both biogenic and synthetic materials. This is particularly of interest for UO2, as there is very little information on particle size and lattice parameters for synthetic UO2 in the literature. Profile fitting of the SXRD data for FeS gives lattice parameters of a = b = 3.668 and a mean crystallite size of 5 to 8 nm. Both of these values are in good agreement with published values. For fresh UO2, lattice parameters were determined as a = b = c = 5.4 nm for both freshly synthesized and aged (3 months) UO2 and particle size was determined to be 3.5 nm for fresh UO2 and 5.83 nm for aged UO2. This suggests a growth mechanism for crystallites over time, and an inferred decrease in reactivity.

  19. Final Scientific/Technical Report, DE-FG02-06ER64171, Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity – Subproject to Co-PI Eric E. Roden

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eric E. Roden

    2009-07-08

    This report summarizes research conducted in conjunction with a project entitled “Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Darrell Chandler (originally at Argonne National Laboratory, now with Akonni Biosystems) was the overall PI/PD for the project. The overall project goals were to (1) apply a model iron-reducer and sulfate-reducer microarray and instrumentation systems to sediment and groundwater samples from the Scheibe et al. FRC Areamore » 2 field site, UMTRA sediments, and other DOE contaminated sites; (2) continue development and expansion of a 16S rRNA/rDNA¬-targeted probe suite for microbial community dynamics as new sequences are obtained from DOE-relevant sites; and (3) address the fundamental molecular biology and analytical chemistry associated with the extraction, purification and analysis of functional genes and mRNA in environmental samples. Work on the UW subproject focused on conducting detailed batch and semicontinuous culture reactor experiments with uranium-contaminated FRC Area 2 sediment. The reactor experiments were designed to provide coherent geochemical and microbiological data in support of microarray analyses of microbial communities in Area 2 sediments undergoing biostimulation with ethanol. A total of four major experiments were conducted (one batch and three semicontinuous culture), three of which (the batch and two semicontinuous culture) provided samples for DNA microarray analysis. A variety of other molecular analyses (clone libraries, 16S PhyloChip, RT-PCR, and T-RFLP) were conducted on parallel samples from the various experiments in order to provide independent information on microbial community response to biostimulation.« less

  20. Progress Toward Remediation of Uranium Tailings in Mailuu-Suu, Kyrgyzstan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buckley, P B; Ranville, J; Honeyman, B D

    2003-07-09

    The town of Mailuu-Suu in Kyrgyzstan inherited 23 distinct tailings deposits from Soviet-Era uranium mining operations. Mailuu-Suu is located in the narrow landslide-prone valley of the Mailuu-Suu River about 25 km from the Uzbekistan border. Large-scale release of the radioactive tailings, as a result of landslides, could lead to irreversible contamination of the river and downstream areas. The Mailuu-Suu River is a tributary to the Syr-Darya River, the Fergana valley's main source of irrigation water. The Fergana Valley is a key agricultural region and major population center that spans Kyrgyzstan, Tajikistan, and Uzbekistan. The trans-boundary nature of the Mailuu-Suu tailingsmore » issue presents an opportunity for collaboration among these Central Asian states. A cooperative approach to addressing environmental issues such as Mailuu-Suu may contribute to the region's stability by facilitating peaceful associations. Experience from remediation of sites in the US under the Uranium Mill Tailings Remediation Action Project (UMTRA) will be useful in progressing toward remediation at Mailuu-Suu.« less

  1. NABIR Assessment Element, Expanded Rapid, Comprehensive, Lipid Biomarker Analysis for Subsurface, Community Composition and Nutritional/Physiological Status as Monitors of Remediation and Detoxification Effectiveness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. White

    2005-09-14

    NABIR funding at the University of Tennessee Center for Biomarker Analysis (CBA) has led to several key contributions to the investigation of bioremediation of metals and radionuclides. This lab has played an integral part in assessing microbial communities at the field scale at the ORNL FRC (Istok et al., 2004) and two UMTRA sites (Anderson et al., 2003, Chang et al., 2001). Our work over the period of the grant has resulted in 42-peer reviewed publications, 62 presentations (14 of which were international), and one patent pending. Currently CBA has 2 papers in press. The main objectives relating to themore » field portion of this program were to provide comprehensive biomarker analysis for NABIR collaborators to enhance the understanding of microbial geo-bioprocesses involved in the effective immobilization of metals (We have worked with and published or currently are publishing with 10 groups of NAIBR investigators). The laboratory portion of our research centered on methods development and has led to three major innovations that could result in a systematic way of evaluating sites for potential bioremediation. The first of these is the development of an in situ sampling device (Peacock et al., 2004, Anderson et al., 2003, Istok et al., 2004) for the collection and concentration of microbial biomass. The second is the development of expanded lipid analysis based on the significantly greater sensitivity and selectivity of the LC/MS/MS that allows the analysis of respiratory quinones, diglycerides, sterols, intact phospholipids, poly-hydroxyalkonates, and potentially archaeol, and caldarchaeols from archea. These new analyses are accomplished more rapidly and with increased sensitivities and resolution than in the past (Lytle et al., 2000a, 2000b, 2001a, Geyer et al., 2004). The third advance is the coupling of lipid analysis with 13C enrichment experiments (Lytle et al., 2001b, Geyer et al. 2005). With this technique it is now possible to follow the active portion of the in situ microbial community with a resolution heretofore not possible. These three advances in technology have been initially demonstrated at the NABIR Field Research Center (FRC) in Oak Ridge, TN and at the UMTRA Old Rifle site in Colorado. Microbial communities are of primary importance in the use of bioimmobilization strategies for metals and radionuclides from contaminated groundwater and sediments. These communities represent a potentially transformable agent that is able to affect virtually all biogeochemical pathways. Microorganisms can alter metal chemistry and mobility through reduction, accumulation, and immobilization and have been shown to be responsible for mineral formation and dissolution. Research is directed to provide collaborating NABIR investigators a rapid, comprehensive, and cost-effective suite of biomarker measurements to quantify microbial community structure, activity, and effectiveness, thereby providing defensible evidence that a desired bioprocess is occurring or may occur at a given site.« less

  2. Investigation of background radiation levels and geologic unit profiles in Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Triplett, G.H.; Foutz, W.L.; Lesperance, L.R.

    1989-11-01

    As part of the Uranium Mill Tailings Remedial Action (UMTRA) Project, Oak Ridge National Laboratory (ORNL) has performed radiological surveys on 435 vicinity properties (VPs) in the Durango area. This study was undertaken to establish the background radiation levels and geologic unit profiles in the Durango VP area. During the months of May through June, 1986, extensive radiometric measurements and surface soil samples were collected in the Durango VP area by personnel from ORNL's Grand Junction Office. A majority of the Durango VP surveys were conducted at sites underlain by Quaternary alluvium, older Quaternary gravels, and Cretaceous Lewis and Mancosmore » shales. These four geologic units were selected to be evaluated. The data indicated no formation anomalies and established regional background radiation levels. Durango background radionuclide concentrations in surface soil were determined to be 20.3 {plus minus} 3.4 pCi/g for {sup 40}K, 1.6 {plus minus} 0.5 pCi/g for {sup 226}Ra, and 1.2 {plus minus} 0.3 pCi/g for {sup 232}Th. The Durango background gamma exposure rate was found to be 16.5 {plus minus} 1.3 {mu}R/h. Average gamma spectral count rate measurements for {sup 40}K, {sup 226}Ra and {sup 232}Th were determined to be 553, 150, and 98 counts per minute (cpm), respectively. Geologic unit profiles and Durango background radiation measurements are presented and compared with other areas. 19 refs., 15 figs., 5 tabs.« less

  3. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bachrach, A.; Hoopes, J.; Morycz, D.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less

  4. Assessment of the quality of groundwater and the Little Wind River in the area of a former uranium processing facility on the Wind River Reservation, Wyoming, 1987 through 2010

    USGS Publications Warehouse

    Ranalli, Anthony J.; Naftz, David L.

    2014-01-01

    In 2010, the U.S Geological Survey (USGS), in cooperation with the Wind River Environmental Quality Commission (WREQC), began an assessment of the effectiveness of the existing monitoring network at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) site. The USGS used existing data supplied by the U.S. Department of Energy (DOE). The study was to determine (1) seasonal variations in the direction of groundwater flow in the area of the former uranium processing facility toward the Little Wind River, (2) the extent of contaminated groundwater among the aquifers and between the aquifers and the Little Wind River, (3) whether current monitoring is adequate to establish the effectiveness of natural attenuation for the contaminants of concern, and (4) the influence of groundwater discharged from the sulfuric-acid plant on water quality in the Little Wind River.

  5. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  6. In-Well Sediment Incubators to Evaluate Microbial Community Stability and Dynamics following Bioimmobilization of Uranium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baldwin, Brett R.; Peacock, Aaron D.; Gan, M.

    2009-09-23

    An in-situ incubation device (ISI) was developed in order to investigate the stability and dynamics of sediment associated microbial communities to prevailing subsurface oxidizing or reducing conditions. Here we describe the use of these devices at the Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) site. During the 7 month deployment oxidized Rifle aquifer background sediments (RABS) were deployed in previously biostimulated wells under iron reducing conditions, cell densities of known iron reducing bacteria including Geobacteraceae increased significantly showing the microbial community response to local subsurface conditions. PLFA profiles of RABS following in situ deployment were strikingly similar to thosemore » of adjacent sediment cores suggesting ISI results could be extrapolated to the native material of the test plots. Results for ISI deployed reduced sediments showed only slight changes in community composition and pointed toward the ability of the ISIs to monitor microbial community stability and response to subsurface conditions.« less

  7. 1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities.more » Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long`s Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long`s Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling eventmore » are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data frommore » this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  10. Health and Safety Research Division: Progress report, October 1, 1985-March 31, 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walsh, P.J.

    1987-09-01

    This report summarizes the progress in our programs for the period October 1, 1985, through March 31, 1987. The division's presentations and publications represented important contributions on the forefronts of many fields. Eleven invention disclosures were filed, two patent applications submitted, and one patent issued. The company's transfers new technologies to the private sector more efficiently than in the past. The division's responsibilities to DOE under the Uranium Mill Tailings Remedial Action (UMTRA) program includes inclusion recommendations for 3100 properties. The nuclear medicine program developed new radiopharmaceuticals and radionuclide generators through clinical trials with some of our medical cooperatives. Twomore » major collaborative indoor air quality studies and a large epidemiological study of drinking water quality and human health were completed. ORNL's first scanning tunneling microscope (STM) has achieved single atom resolution and has produced some of the world's best images of single atoms on the surface of a silicon crystal. The Biological and Radiation Physics Section, designed and constructed a soft x-ray spectrometer which has exhibited a measuring efficiency that is 10,000 times higher than other equipment. 1164 refs.« less

  11. Microbial Functional Gene Diversity with a Shift of Subsurface Redox Conditions during In Situ Uranium Reduction

    PubMed Central

    Liang, Yuting; Van Nostrand, Joy D.; N′Guessan, Lucie A.; Peacock, Aaron D.; Deng, Ye; Long, Philip E.; Resch, C. Tom; Wu, Liyou; He, Zhili; Li, Guanghe; Hazen, Terry C.; Lovley, Derek R.

    2012-01-01

    To better understand the microbial functional diversity changes with subsurface redox conditions during in situ uranium bioremediation, key functional genes were studied with GeoChip, a comprehensive functional gene microarray, in field experiments at a uranium mill tailings remedial action (UMTRA) site (Rifle, CO). The results indicated that functional microbial communities altered with a shift in the dominant metabolic process, as documented by hierarchical cluster and ordination analyses of all detected functional genes. The abundance of dsrAB genes (dissimilatory sulfite reductase genes) and methane generation-related mcr genes (methyl coenzyme M reductase coding genes) increased when redox conditions shifted from Fe-reducing to sulfate-reducing conditions. The cytochrome genes detected were primarily from Geobacter sp. and decreased with lower subsurface redox conditions. Statistical analysis of environmental parameters and functional genes indicated that acetate, U(VI), and redox potential (Eh) were the most significant geochemical variables linked to microbial functional gene structures, and changes in microbial functional diversity were strongly related to the dominant terminal electron-accepting process following acetate addition. The study indicates that the microbial functional genes clearly reflect the in situ redox conditions and the dominant microbial processes, which in turn influence uranium bioreduction. Microbial functional genes thus could be very useful for tracking microbial community structure and dynamics during bioremediation. PMID:22327592

  12. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    ERIC Educational Resources Information Center

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  13. 36 CFR 218.25 - Comments on proposed projects and activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Comments on a proposed project or activity to be documented in an environmental assessment shall be...) Comments on a proposed project or activity to be documented in an environmental impact statement shall be... proposed project or activity to be documented with an environmental assessment shall not be extended. (2...

  14. 36 CFR 218.25 - Comments on proposed projects and activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Comments on a proposed project or activity to be documented in an environmental assessment shall be...) Comments on a proposed project or activity to be documented in an environmental impact statement shall be... proposed project or activity to be documented with an environmental assessment shall not be extended. (2...

  15. Student Organizations--FBLA Projects and Activities Relating to Free Enterprise.

    ERIC Educational Resources Information Center

    Western Kentucky Univ., Bowling Green.

    This guide for Future Business Leaders of America and Phi Beta Lambda chapters describes 25 economic awareness projects/activities to create awareness of the free enterprise economic system. Introductory materials include suggestions for project planning and management and a worksheet for planning activities and projects. The projects/activities…

  16. Country watch: Central African Republic (CAR).

    PubMed

    Aubel, J; Sobela, F; Voga, P

    1997-01-01

    This article describes the activities of the Community Peer AIDS Education Project, initiated in 1995 in the Central African Republic (CAR). The CAR project was created by the National AIDS Committee (NAC) and the US Peace Corps. A 4-day workshop was held at the onset for project staff and consultants. Staff developed a simple monitoring and evaluation (M&E) system that emphasizes "learning." M&E schemes measure project outputs, expenditures, and other measures of program implementation in order to help staff gradually improve implementation. M&E helps staff document activities, share information, and learn from the implementation process. Project activities are documented by maintaining community logbooks, taking photos of significant aspects of the educational activities, and leading informal discussion groups. The CAR project engaged in sharing and learning activities by holding meetings with peer leaders, team meetings, meetings with project managers, and meetings with the NAC. Once a month, peer field coordinators conducted a structured exercise with peer leaders. One aim was to gain their feedback on the successes and constraints of activities. Another was to make suggestions on how to improve activities. These structured exercises are recorded as lessons learned in a project book. Team meetings are held periodically. During meetings, staff review project books and photos and discuss successes and problems encountered. Project manager meetings provide time to share lessons learned and to suggest project strengthening options. NAC meetings between the project manager and field coordinators allow for a bottom-up learning process. CAR project staff were receptive to M&E efforts.

  17. Project WILD K-12 Curriculum and Activity Guide

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2011

    2011-01-01

    The "Project WILD K-12 Curriculum and Activity Guide" focuses on wildlife and habitat. It is organized in topic units and is based on the Project WILD conceptual framework. Because these activities are designed for integration into existing courses of study, instructors may use one or many Project WILD activities or the entire set of activities…

  18. 22 CFR 216.2 - Applicability of procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... river basin development; (ii) Irrigation or water management projects, including dams and impoundments... projects, programs or activities authorized or approved by A.I.D. and to substantive amendments or extensions of ongoing projects, programs, or activities. (b) Exemptions. (1) Projects, programs or activities...

  19. Data Validation Package November 2015 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites February 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Processing Sites. Duplicate samples were collected from New Rifle locations 0659 and 0855, and Old Rifle location 0304. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008more » Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920), with one exception: New Rifle location 0635 could not be sampled because it was inaccessible; a fence installed by the Colorado Department of Transportation prevents access to this location. DOE is currently negotiating access with the Colorado Department of Transportation. Analytes measured at the New Rifle site included contaminants of concern (COCs) (arsenic, molybdenum, nitrate + nitrite as nitrogen, selenium, uranium, and vanadium) ammonia as nitrogen, major cations, and major anions. Field measurements of total alkalinity, oxidation- reduction potential, pH, specific conductance, turbidity, and temperature were made at each location, and the water level was measured at each sampled well. A proposed alternate concentration limit (ACL) for vanadium of 50 milligrams per liter (mg/L), specific to the compliance (POC) wells (RFN-0217, -0659, -0664, and -0669) is included in the New Rifle GCAP. Vanadium concentrations in the POC wells were below the proposed ACL as shown in the time-concentration graphs in the Data Presentation section (Attachment 2). Time-concentration graphs from all other locations sampled are also included in Attachment 2. Sampling location RFN-0195 was misidentified for the June/August 2014 and November 2014 sampling events. (Well RFN-0609 was inadvertently sampled instead of RFN-0195 in 2014.) The results for RFN-0195 have been corrected, and are included in associated time-concentration graphs for this location. Recent results for RFN-0195 are consistent with established trends with the possible exception of vanadium. The most recent result for vanadium showed an increase over recent values. Vanadium concentrations at RFN-0195 and other locations will continue to be evaluated in the future to determine the potential for deviations from established trends. The surface water locations were sampled to monitor the impact of groundwater discharge. COC concentrations at Colorado River surface water locations RFN-0324 and RFN-0326, downgradient of the site, remained low and were consistent with historical results, as shown in the time-concentration graphs. COC concentrations did not indicate there are any impacts related to groundwater discharge to the river. In many cases, elevated COC concentrations at the New Rifle site pond locations were observed, as shown in the time-versus concentration graphs. As noted in the GCAP, this indicates impacts from groundwater discharge to the ponds. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Groundwater Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR). Analytes measured at the Old Rifle site included COCs (selenium, uranium, and vanadium), major cations, and major anions. Field measurements of total alkalinity, oxidation-reduction potential, pH, specific conductance, turbidity, temperature, were made at each location, and the water level was measured at each sampled well. The monitoring strategy described in the GCAP is designed to determine progress of the natural flushing process in meeting compliance standards for site COCs. Standards for selenium and vanadium are the proposed ACLs of0.05 mg/L and 1.0 mg/L, respectively. For uranium the cleanup goal is the UMTRA standard of 0.044 mg/L or background, whichever is higher. As shown in the time concentration graphs, the uranium concentration exceeds the cleanup goal at groundwater monitoring locations RF0-0304, -0305, -0310, -0655, and -0656. The surface water locations were sampled to monitor the impact of groundwater discharge at Colorado River surface water locations adjacent to (RF0-0396) and downgradient of the site (RF0-0741). COC concentrations remain low and consistent with historical concentrations as shown in the time-concentration graphs (Attachment 2), which indicate no impacts from groundwater discharge to the river.« less

  20. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The following activities are authorized under community-based projects: (1) Job search assistance. (2) Job... Community-Based Supported Employment projects for the provision of extended supported employment services...

  1. The Effect of Project-Based Activities on Intermediate EFL Students' Reading Comprehension Ability

    ERIC Educational Resources Information Center

    Shiraz, Mona Poorverdi; Larsari, Ebrahim Ezati

    2014-01-01

    The present study investigates the relationship between the use of Project-based activities and intermediate EFL students' reading comprehension. The study addresses the questions of whether students' reading comprehension differs after implementing Project-based activities, and whether different projects lead to different degrees of reading…

  2. Project WILD Aquatic K-12 Curriculum and Activity Guide

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2011

    2011-01-01

    The "Project WILD Aquatic K-12 Curriculum and Activity Guide" emphasizes aquatic wildlife and aquatic ecosystems. It is organized in topic units and is based on the Project WILD conceptual framework. Because these activities are designed for integration into existing courses of study, instructors may use one or many Project WILD Aquatic activities…

  3. Project WET: Facilitator Handbook for Implementation of Activities in Virginia.

    ERIC Educational Resources Information Center

    Sevebeck, Kathryn P.

    This handbook features ideas for implementing Project WET activities in Virginia. Project WET activities are designed for a variety of educational programs and can be used to complement existing curricula while addressing curricular objectives and educational standards nationwide. Activities include: (1) "Life Systems"; (2)…

  4. Go / NGO success ensures Vietnam project.

    PubMed

    2000-02-01

    This article reports the results of a joint evaluation by the Japanese Evaluation Team and the People's Committee of Nghe An on the Japan International Cooperation Agency Vietnam Reproductive Health (RH) Project. The evaluation, which was conducted through a workshop, showed that the Vietnam RH Project in Nghe An Province was successful. With two short-term experts dispatched to Vietnam in November and December 1999, the Project¿s activities were realized. Many activities were undertaken, which included retraining of community health centers, improvement of district health centers¿ monitoring capacity, and prenatal examination. Although the evaluation was carried out after only 2 years of actual activities, the Project¿s planned activities showed a smooth implementation as a result of good collaboration among Japan, the Vietnamese government, and nongovernmental organizations. With the successful outcome of the first phase of the project, both Japan and Vietnam have put up plans for future project activities.

  5. Project WET Curriculum and Activity Guide 2.0

    ERIC Educational Resources Information Center

    Project WET Foundation, 2011

    2011-01-01

    The "Project WET Curriculum and Activity Guide 2.0" continues Project WET's dedication to 21st-century, cutting-edge water education. Now in full color, Guide 2.0 offers new activities on topics such as National Parks and storm water, fully revised and updated activities from the original Guide and the very best activities gathered from all of…

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, R.C.

    The National Conference of State Legislatures' Geothermal Policy Project concentrated its efforts in two areas: (1) state activities and (2) development of project materials. Six states were to participate in the project during its first year: Delaware, Hawaii, New Mexico, Oregon, Utah and Virginia. The project pamphlet, a final draft of the Issue Paper and the review of state statutes and regulations were completed. Project activities are also discussed in the following areas: publicity, liaison activities, professional papers, and conferences.

  7. An overview of the active flexible wing program

    NASA Technical Reports Server (NTRS)

    Cole, Stanley R.; Perry, Boyd, III; Miller, Gerald D.

    1991-01-01

    An outline of the Active Flexible Wing (AFW) project that was meant to serve as an introduction to an entire session of the Computational Control Workshop is presented. Following background information on the project is a description of the AFW wind tunnel model and results from the initial wind tunnel test of the AFW model under the current project. Emphasis is on major project accomplishments. The AFW project is an effort to demonstrate aeroelastic control through the application of digital controls technology. Active flutter suppression and active control of maneuver loads during high speed rolling maneuvers are examined.

  8. Measuring research progress in photovoltaics

    NASA Technical Reports Server (NTRS)

    Jackson, B.; Mcguire, P.

    1986-01-01

    The role and some results of the project analysis and integration function in the Flat-plate Solar Array (FSA) Project are presented. Activities included supporting the decision-making process, preparation of plans for project direction, setting goals for project activities, measuring progress within the project, and the development and maintenance of analytical models.

  9. Continuous Risk Management

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phil

    2002-01-01

    Risk identification is an ongoing activity that takes place during the routine project work flow. Project activities such as programmatic and technical meetings, telecons, reviews, and other forms of communication often bring to light project risks. When this occurs, we record and analyze the risk on a Risk Information Sheet. This process helps the project team identify and cope with project risks throughout the life of the project.

  10. A model for safety and health promotion among Danish farmers.

    PubMed

    Hjort, Charlotte; Højmose, Poul; Sherson, David

    2003-01-01

    In 1999, a project concerning the prevention of accidents and occupational diseases was started in Vejle County, Denmark. The aim of the project was to increase the safety and health in farming. The project was based on a participatory strategy. The main principles were local involvement in designing the project, multifaceted activities for defined target-groups and respect for occupational skills and integrity. This multilevel approach involved individuals, groups and organisations. Activities were initiated and adjusted throughout the project. This interactive work remodeling the activities throughout the project period and method encouraged empowerment leaving experiences among the participants. Target groups included farmers, farmers' wives, agricultural advisors, agricultural school teachers, employees and part-time assistants. Activities included dialog-meetings, information meetings in larger and smaller groups, as well as designing of educational safety material, e.g., for children and employees. The project is run with a very low degree of central organisational activities, and is also a so called "bottom-up" project with a low budget. Evaluations are undertaken throughout the project period. If this concept can be implemented in Denmark, it may well be useful in other developed as well as less industrialized countries.

  11. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  12. 76 FR 1437 - Issuance of Final Policy Directive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... to fund medically based activities in projects that address such health issues as diabetes prevention... and program clarifications, modifications, and activities for the fiscal year (FY) 2011 FOAs. The... previously funded projects proposed by the same applicant or activities or projects proposed by a consortium...

  13. Development of a Novel Segmental Bone Defect Construct

    DTIC Science & Technology

    2017-10-01

    differentiation, and biological activity of both primary synoviocytes and bone marrow derived connective tissue progenitor cells. During the majority of...halted activity on the project from the dates of 31 May 2016 to 13 July 2017. However, the project is on schedule with the current, revised project...supervised all project activities and participated in the preparation of the manuscript that was produced during this reporting period. Name: Dr

  14. American Issues Forum: Active Projects--Summary Report [And] Nationally Circulated Materials.

    ERIC Educational Resources Information Center

    National Endowment for the Humanities (NFAH), Washington, DC.

    These two reports briefly describe the active projects and nationally circulated mateirals associated with the American Issues Forum Bicentennial Programs. The summary report of active projects is designed to show how various national media, national and international organizations, corporations, and state and community groups are actively…

  15. 34 CFR 647.4 - What activities and services may a project provide?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAM General § 647.4 What activities and services may a project provide? A McNair project may provide... activities designed to prepare participants for doctoral study. (d) Tutoring. (e) Academic counseling. (f... programs. (g) Mentoring programs involving faculty members or students at institutions of higher education...

  16. Connections: Water, Systems, and Resources. Unit Grade 3.

    ERIC Educational Resources Information Center

    Ney, Catherine R.

    Natural Resources for Grade 3 is a "hands-on" environmental activities unit designed for teachers to use with their students. Activities are chosen from natural resource programs such as Project Learning Tree, Project WILD, Aquatic Wild, and Project WET. The activities address natural resource themes and meet the Virginia Standards of…

  17. Connections: Weather, Systems, and Resources. Unit Grade 4.

    ERIC Educational Resources Information Center

    Ney, Catherine R.; Cross, Pat

    Natural Resources for Grade 4 is a "hands-on" environmental activities unit designed for teachers to use with their students. Activities are chosen from natural resource programs such as Project Learning Tree, Project WILD, Aquatic Wild, and Project WET. The activities address natural resource themes and meet the Virginia Standards of…

  18. Software Program: Software Management Guidebook

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

  19. Project to Incorporate Anthropological Concepts of Human Diversity in Secondary School Social Studies Curricula (Project Anthropology). Final Report, 2/1/80 to 1/31/82.

    ERIC Educational Resources Information Center

    Giannangelo, Duane M.; And Others

    Learning modules emphasizing the anthropological aspects of human and race relations to supplement social studies textbooks used in grades 7-12 were developed. The final report describes pre-project activities, module development, and project evaluation and accomplishments. Pre-project activities included media publicity, reviewing social studies…

  20. Urban High School Student Engagement Through CincySTEM iTEST Projects

    NASA Astrophysics Data System (ADS)

    Beckett, Gulbahar H.; Hemmings, Annette; Maltbie, Catherine; Wright, Kathy; Sherman, Melissa; Sersion, Brian

    2016-12-01

    This paper focuses on the notable heightening of underrepresented students' engagement in STEM education through project-based learning CincySTEM iTEST projects. The projects, funded by an iTEST NSF grant, were designed and facilitated by teachers at a new STEM urban public high school serving low-income African-American students. Student engagement conceptualized as a psychological process involving affective and behavioral participation in classroom activities was evaluated through a mixed-methods approach. Findings indicate that affective and behavioral participation was significantly enhanced when project activities utilized digital devices in hands-on investigations of real-world project activities. Explanations for the success of CincySTEM iTEST projects are presented in the conclusion along with challenges for sustainability.

  1. Portsmouth Atmospheric Science School (PASS) Project

    NASA Technical Reports Server (NTRS)

    Coleman, Clarence D.; Hathaway, Roger (Technical Monitor)

    2002-01-01

    The Portsmouth Atmospheric Science School Project (PASS) Project was granted a one-year no cost extension for 2001-2002. In year three of the project, objectives and strategies were modified based on the previous year-end evaluation. The recommendations were incorporated and the program was replicated within most of the remaining elementary schools in Portsmouth, Virginia and continued in the four middle schools. The Portsmouth Atmospheric Science School Project is a partnership, which includes Norfolk State University, Cooperating Hampton Roads Organizations for Minorities in Engineering (CHROME), NASA Langley Research Center, and the City of Portsmouth, Virginia Public Schools. The project seeks to strengthen the knowledge of Portsmouth Public Schools students in the field of atmospheric sciences and enhance teacher awareness of hands on activities in the atmospheric sciences. The project specifically seeks to: 1) increase the interest and participation of elementary and middle school students in science and mathematics; 2) strengthen existing science programs; and 3) facilitate greater achievement in core subjects, which are necessary for math, science, and technical careers. Emphasis was placed on providing training activities, materials and resources for elementary students (grades 3 - 5) and middle school students (grades 6 - 8), and teachers through a CHROME club structure. The first year of the project focused on introducing elementary students to concepts and activities in atmospheric science. Year two of the project built on the first year's activities and utilizes advanced topics and activities appropriate for middle school students. During the third year of the project, in addition to the approaches used in years one and two, emphasis was placed on activities that enhanced the Virginia Standards of Learning (SOL).

  2. 75 FR 68319 - Paulina Ranger District; Ochoco National Forest; Crook and Wheeler Counties, OR; Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... and Wheeler Counties, OR; Jackson Vegetation Management Project EIS AGENCY: Forest Service, USDA... fuels and vegetation management activities in the project area by comparing the existing condition to.... Excessive fuel from management activities in this project and past projects would be reduced on...

  3. Connecting Family Learning and Active Citizenship

    ERIC Educational Resources Information Center

    Flanagan, Mary

    2009-01-01

    In Ireland family learning and active citizenship has not been linked together until 2006. It was while the Clare Family Learning Project was involved in a family learning EU learning network project, that a suggestion to create a new partnership project linking both areas was made and FACE IT! was born (Families and Active Citizenship…

  4. Oceanography. Boy Scouts of America Merit Badge Series.

    ERIC Educational Resources Information Center

    Boy Scouts of America, Irving, TX.

    Presented are various activities and projects intended to help Boy Scouts earn a merit badge in oceanography. Each project and/or activity is related to a requirement (objective) found in a list at the beginning of the booklet. Topic areas and/or related activities and projects include: (1) nature of oceanography (naming oceanography branches,…

  5. Community Service or Activism as an Identity Project for Youth

    ERIC Educational Resources Information Center

    Harre, Niki

    2007-01-01

    This article reviews the literature on community service and activism, particularly in youth, using the theoretical approach provided by an identity projects framework. This framework allows for an examination of the contextual and experiential factors that contribute to the emergence and maintenance of an identity project of service or activism.…

  6. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  7. The Application of Project Management Techniques to College and University Admissions Activities.

    ERIC Educational Resources Information Center

    Bickers, Doyle

    1993-01-01

    The process of project management is illustrated through application to one activity, development of a new brochure, within the admissions program of a fictional college. The project life cycle is described, and a work responsibility schedule, project completion schedule, and critical path chart are used as planning and implementation tools. (MSE)

  8. Increasing the Impact of Federally-Administered Vocational Education Exemplary Projects. Final Report. Leadership Training Series No. 52.

    ERIC Educational Resources Information Center

    Hull, William L.; Bina, James V.

    This report was written as a companion piece to "Increasing the Impact of Innovative Projects," proceedings of the national conference on the impact of federally-administered vocational education exemplary projects. Brief descriptions of the project's accomplishments, major activities and events, problems, publicity activities, and dissemination…

  9. Project ACTIVate: Innovations from New Zealand

    ERIC Educational Resources Information Center

    Yelas, Janet; Engles, Paul

    2010-01-01

    This case study discusses a collaborative three year project involving two school clusters located in the North Island and South Island of New Zealand. The project was named "Project ACTIVate" and its main thrust was to study how the use of the interactive whiteboard (IWB) combined with teaching, learning and research across schools. The…

  10. Flat-plate solar array project. Volume 8: Project analysis and integration

    NASA Technical Reports Server (NTRS)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  11. A SUPPLEMENT TO THE INVENTORY OF PROJECTS AND ACTIVITIES IN READING AND ENGLISH.

    ERIC Educational Resources Information Center

    BABYLON, SALLY; HAYES, ALFRED S.

    A SUPPLEMENT TO THE INVENTORY OF PROJECTS AND ACTIVITIES IN READING AND ENGLISH PUBLISHED IN FEBRUARY 1966 IS PRESENTED. A NEW TOPICAL INDEX WAS ADDED WHICH SHOULD INCREASE THE USEFULNESS OF THE SUPPLEMENT. PROGRAMS, PROJECTS, AND ACTIVITIES DESIGNED TO EVALUATE AND TO IMPROVE THE TEACHING OF READING AND ENGLISH IN SCHOOLS AND COLLEGES ARE…

  12. 4-H Horticulture Project Activity Guides. Leader's Guide and Units 1-3.

    ERIC Educational Resources Information Center

    Illinois Univ., Urbana. Cooperative Extension Service.

    This document, concerning the 4-H horticulture project, includes a leader's guide and three youth activity guides. The leader's guide can be used to plan group project meetings that are both fun and educational. Activities can be adapted to various age groups. The leader's guide includes basic information for growing plants indoors and outdoors,…

  13. Using Group Drawings Activities to Facilitate the Understanding of the Systemic Aspects of Projects

    ERIC Educational Resources Information Center

    Arantes do Amaral, João Alberto; Hess, Aurélio; Gonçalves, Paulo; Rodrigues, Vinícius Picanço

    2017-01-01

    In this article, we present our findings regarding promoting group drawing activities in order to facilitate the learning of systemic aspects of projects. We discuss the approach we used to engage the students and foster learning in our classes. We used group drawing activities in two project management undergraduate courses. The courses, which…

  14. 75 FR 74056 - Request for Public Comment on the Proposed Adoption of Administration for Native Americans (ANA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... to fund medically based activities in projects that address such health issues as diabetes prevention... previously funded projects proposed by the same applicant or activities or projects proposed by a consortium that duplicate activities for which any consortium member also receives funding from ANA.'' This is a...

  15. NASA Education Activities on the International Space Station: A National Laboratory for Inspiring, Engaging, Educating and Employing the Next Generation

    NASA Technical Reports Server (NTRS)

    Severance, Mark T.; Tate-Brown, Judy; McArthur, Cynthia L.

    2010-01-01

    The International Space Station (ISS) National Lab Education Project has been created as a part of the ISS National Lab effort mandated by the U.S. Congress The project seeks to expand ISS education of activities so that they reach a larger number of students with clear educational metrics of accomplishments. This paper provides an overview of several recent ISS educational payloads and activities. The expected outcomes of the project, consistent with those of the NASA Office of Education, are also described. NASA performs numerous education activities as part of its ISS program. These cover the gamut from formal to informal educational opportunities in grades Kindergarten to grade 12, Higher Education (undergraduate and graduate University) and informal educational venues (museums, science centers, exhibits). Projects within the portfolio consist of experiments performed onboard the ISS using onboard resources which require no upmass, payloads flown to ISS or integrated into ISS cargo vehicles, and ground based activities that follow or complement onboard activities. Examples include ground based control group experiments, flight or experiment following lesson plans, ground based activities involving direct interaction with ISS or ground based activities considering ISS resources in their solution set. These projects range from totally NASA funded to projects which partner with external entities. These external agencies can be: other federal, state or local government agencies, commercial entities, universities, professional organizations or non-profit organizations. This paper will describe the recent ISS education activities and discuss the approach, outcomes and metrics associated with the projects.

  16. Human Activity Recognition in AAL Environments Using Random Projections.

    PubMed

    Damaševičius, Robertas; Vasiljevas, Mindaugas; Šalkevičius, Justas; Woźniak, Marcin

    2016-01-01

    Automatic human activity recognition systems aim to capture the state of the user and its environment by exploiting heterogeneous sensors attached to the subject's body and permit continuous monitoring of numerous physiological signals reflecting the state of human actions. Successful identification of human activities can be immensely useful in healthcare applications for Ambient Assisted Living (AAL), for automatic and intelligent activity monitoring systems developed for elderly and disabled people. In this paper, we propose the method for activity recognition and subject identification based on random projections from high-dimensional feature space to low-dimensional projection space, where the classes are separated using the Jaccard distance between probability density functions of projected data. Two HAR domain tasks are considered: activity identification and subject identification. The experimental results using the proposed method with Human Activity Dataset (HAD) data are presented.

  17. Human Activity Recognition in AAL Environments Using Random Projections

    PubMed Central

    Damaševičius, Robertas; Vasiljevas, Mindaugas; Šalkevičius, Justas; Woźniak, Marcin

    2016-01-01

    Automatic human activity recognition systems aim to capture the state of the user and its environment by exploiting heterogeneous sensors attached to the subject's body and permit continuous monitoring of numerous physiological signals reflecting the state of human actions. Successful identification of human activities can be immensely useful in healthcare applications for Ambient Assisted Living (AAL), for automatic and intelligent activity monitoring systems developed for elderly and disabled people. In this paper, we propose the method for activity recognition and subject identification based on random projections from high-dimensional feature space to low-dimensional projection space, where the classes are separated using the Jaccard distance between probability density functions of projected data. Two HAR domain tasks are considered: activity identification and subject identification. The experimental results using the proposed method with Human Activity Dataset (HAD) data are presented. PMID:27413392

  18. Water-resources activities in New England, fiscal year 1993

    USGS Publications Warehouse

    Orlando, M.F.

    1994-01-01

    The U.S. Geological Survey has 82 active or complete-except-report projects of hydrologic investigations ongoing within the New England Program Area. Of this total, 23 are data projects. Data projects contain statistics and data on the conditions of surface water, ground water, water quality and (or) water use for the study area. There currently are six data projects in Connecticut, five in Maine, four in Massachusetts, four in Rhode Island, and four in New Hampshire and Vermont. The remaining 59 of these projects are interpretive projects. Interpretive projects include research, aerial appraisal, and other hydrologic studies and include projects as diverse as (1) determining the direction of ground-water flow at a toxic site, (2) predicting the effect of acid rain on water quality of a reservoir, and (3) estimating yields of aquifers on Cape Cod. Of the interpretive projects, 26 are in Massachusetts, 17 in Connecticut, 17 are in New Hampshire and Vermont, 6 are in Maine, and 3 in Rhode Island. The report is compiled from project descriptions for fiscal year 1993. It briefly describes the water-resources activities and projects that were active in each District of the USGS, Water Resources Division, New England Program Area of September 30, 1993. Cooperator or funding source, problem statements, objectives, approaches, progress, and plans for next year are described for each project. The project area is located on a map of the appropriate State(s). The report contains a bibliography, by District and by author, of reports completed since 1977.

  19. 77 FR 5258 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Information Collection Activity; Comment Request Proposed Projects Title: Child Welfare Demonstration Projects... agencies to submit proposals for new child welfare waiver demonstration projects. CB is able to approve up to ten child welfare [[Page 5259

  20. MISR Aoba Volcano Plume

    Atmospheric Science Data Center

    2018-06-07

    ... in ongoing eruptions using parallax. View the MISR Active Aerosol Plume-Height (AAP) Project paper to see peak altitude and settling ... R. Kahn/NASA GSFC Access Project Paper: MISR Active Aerosol Plume-Height (AAP) Project Access and Order MISR Data and ...

  1. The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

  2. Telescience Resource Kit Software Lifecycle

    NASA Technical Reports Server (NTRS)

    Griner, Carolyn S.; Schneider, Michelle

    1998-01-01

    The challenge of a global operations capability led to the Telescience Resource Kit (TReK) project, an in-house software development project of the Mission Operations Laboratory (MOL) at NASA's Marshall Space Flight Center (MSFC). The TReK system is being developed as an inexpensive comprehensive personal computer- (PC-) based ground support system that can be used by payload users from their home sites to interact with their payloads on board the International Space Station (ISS). The TReK project is currently using a combination of the spiral lifecycle model and the incremental lifecycle model. As with any software development project, there are four activities that can be very time consuming: Software design and development, project documentation, testing, and umbrella activities, such as quality assurance and configuration management. In order to produce a quality product, it is critical that each of these activities receive the appropriate amount of attention. For TReK, the challenge was to lay out a lifecycle and project plan that provides full support for these activities, is flexible, provides a way to deal with changing risks, can accommodate unknowns, and can respond to changes in the environment quickly. This paper will provide an overview of the TReK lifecycle, a description of the project's environment, and a general overview of project activities.

  3. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  4. Indicators of sustainable capacity building for health research: analysis of four African case studies.

    PubMed

    Bates, Imelda; Taegtmeyer, Miriam; Squire, S Bertel; Ansong, Daniel; Nhlema-Simwaka, Bertha; Baba, Amuda; Theobald, Sally

    2011-03-28

    Despite substantial investment in health capacity building in developing countries, evaluations of capacity building effectiveness are scarce. By analysing projects in Africa that had successfully built sustainable capacity, we aimed to identify evidence that could indicate that capacity building was likely to be sustainable. Four projects were selected as case studies using pre-determined criteria, including the achievement of sustainable capacity. By mapping the capacity building activities in each case study onto a framework previously used for evaluating health research capacity in Ghana, we were able to identify activities that were common to all projects. We used these activities to derive indicators which could be used in other projects to monitor progress towards building sustainable research capacity. Indicators of sustainable capacity building increased in complexity as projects matured and included- early engagement of stakeholders; explicit plans for scale up; strategies for influencing policies; quality assessments (awareness and experiential stages)- improved resources; institutionalisation of activities; innovation (expansion stage)- funding for core activities secured; management and decision-making led by southern partners (consolidation stage).Projects became sustainable after a median of 66 months. The main challenges to achieving sustainability were high turnover of staff and stakeholders, and difficulties in embedding new activities into existing systems, securing funding and influencing policy development. Our indicators of sustainable capacity building need to be tested prospectively in a variety of projects to assess their usefulness. For each project the evidence required to show that indicators have been achieved should evolve with the project and they should be determined prospectively in collaboration with stakeholders.

  5. Report on a Knowledge-Based Software Assistant.

    DTIC Science & Technology

    1983-08-01

    maintainers, project managers , and end-users). In this paradigm, software activities, including definition, management , and validation will be...project management . This report also presents a plan for the development of the KBSA, along with a description of the necessary supporting technology...Activity Coordination .. .. .. ..... ...... ..... .... 19 3.2 Project Management and Documentation. .. ... ........ 20 3.2.1 Project Management Facet

  6. Illinois State Project: Services for Children with Deaf-Blindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Dorsey, Christine

    This final report describes activities and accomplishments of the Illinois state project on services for children with deaf-blindness, a 3-year federally supported project to address the needs of children (ages birth to 21) who are deaf-blind. Project activities included inservice training and technical assistance, development of a comprehensive…

  7. Improving Project Management with Simulation and Completion Distribution Functions

    NASA Technical Reports Server (NTRS)

    Cates, Grant R.

    2004-01-01

    Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

  8. 34 CFR 379.11 - What additional types of project activities may be authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What additional types of project activities may be... Program? § 379.11 What additional types of project activities may be authorized under this program? The... requirements of the ADA, as that Act relates to employment of individuals with disabilities. (Authority: 29 U.S...

  9. 25 CFR 170.623 - How are IRR Program projects and activities included in a self-governance agreement?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program projects and activities included in a self-governance agreement? 170.623 Section 170.623 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE... self-governance agreement? To include an IRR Program project or activity in a self-governance agreement...

  10. DOE and AID stand-alone photovoltaic activities

    NASA Technical Reports Server (NTRS)

    Bifano, W. J.; Ratajczak, A. F.

    1983-01-01

    The NASA Lewis Research Center (LeRC) is managing stand-alone photovoltaic (PV) system activities sponsored by the U.S. Department of Energy (DOE) and the U.S. Agency for International Development (AID). The DOE project includes village PV power demonstration projects in Gabon (four sites) and the Marshall Islands, PV-powered medical refrigerators in six countries, PV system microprocessor control development activities and PV-hybrid system assessments. The AID project includes a large village system in Tunisia, a water pumping/grain grinding project in Upper Volta, five medical clinics in four countries, PV-powered remote earth station application. These PV activities and summarizes significant findings to data are reviewed.

  11. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less

  12. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less

  13. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less

  14. Contribution to fusion research from IAEA coordinated research projects and joint experiments

    NASA Astrophysics Data System (ADS)

    Gryaznevich, M.; Van Oost, G.; Stöckel, J.; Kamendje, R.; Kuteev, B. N.; Melnikov, A.; Popov, T.; Svoboda, V.; The IAEA CRP Teams

    2015-10-01

    The paper presents objectives and activities of IAEA Coordinated Research Projects ‘Conceptual development of steady-state compact fusion neutron sources’ and ‘Utilisation of a network of small magnetic confinement fusion devices for mainstream fusion research’. The background and main projects of the CRP on FNS are described in detail, as this is a new activity at IAEA. Recent activities of the second CRP, which continues activities of previous CRPs, are overviewed.

  15. Project U-Turn: increasing active transportation in Jackson, Michigan.

    PubMed

    TenBrink, David S; McMunn, Randall; Panken, Sarah

    2009-12-01

    Jackson, Michigan, is a medium-sized city suffering from a bad economy and obesity-related health issues. Nearly 20% of the 36,000 residents live below the poverty line. It is a relatively young city (median age of 30 years) with a mixed ethnicity (20% black, 73% white, 4% Hispanic). The city offers many structured, active recreational opportunities, but has not integrated physical activity into daily life. Project U-Turn aimed to increase active transportation (e.g., biking, walking, and transit use) through an integrated approach to Active Living by Design's community action model and the Michigan Safe Routes to School model. Resources were focused on active living promotions and programs; partnership meetings were the source of changes in policy and physical projects. Each initiative was designed to introduce each of the 5Ps (preparation, promotion, programs, policy, and physical projects) to build support for the partnership's overall work. The partnership collected snapshot data of community walking and biking behavior, percentage of students walking to school, participation in events and programs, and new physical projects. Jackson saw a vast improvement in physical infrastructure and policy and a related increase in walking and biking in the community. The project engaged in purposeful partnership building to implement effective programs and promotions that built support for policy and physical projects. Limited resources were best used by encouraging partners to contribute and coordinate activities using existing staff, funding, and resources. Jackson has seen a shift toward awareness of the benefits of active living on community health, economic development, and environmental awareness.

  16. Health Activities Project (HAP): Action/Reaction Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within this module are teacher and student folios describing activities in timing, improving, and practicing to improve reaction…

  17. Preview: Evaluation of the 1973-1974 Bilingual/Bicultural Project. Formative Evaluation Report.

    ERIC Educational Resources Information Center

    Ligon, Glynn; And Others

    The formative report provided the Austin Independent School District personnel with information useful for planning the remaining activities for the 1973-74 Bilingual/Bicultural Project and the activities for the 1974-75 Project. Emphasis was on what had been done to evaluate the 1973-74 Project, the data which was or would be available for the…

  18. Mt. Druitt Early Childhood Project. Third, Fourth, and Fifth Annual Reports to Bernard Van Leer Foundation.

    ERIC Educational Resources Information Center

    Macquarie Univ., North Ryde (Australia). School of Education.

    This series of the third, fourth, and fifth annual reports to the Bernard Van Leer Foundation on the Mt. Druitt Early Childhood Project of Macquarie University, Australia, describes the general activities, program developments, and research activities of the project for the period 1977-1979. The main objective of the project is to develop,…

  19. New Jersey Technical Assistance Project (N.J. TAP): "Educational Resources and Support Services on Behalf of Children with Multiple Sensory Impairment." Final Report.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…

  20. Water-resources activities of the U.S. Geological Survey in Texas: Fiscal year 1988

    USGS Publications Warehouse

    Mitchell, Alicia A.

    1989-01-01

    This report describes the activities of the U.S. Geological Survey Water Resources Division in Texas for fiscal year 1988. The project number, cooperating agencies, project chief, period of project, location, problem, objective, approach, progress, reports in preparation, and reports published are given for each project in the Texas District. The report also includes a list of reports published or approved for publication during fiscal year 1988, and a plate showing the locations of the Subdistrict areas and active surface-water stations in Texas.

  1. Activities of the Alaska District, Water Resources Division, U.S. Geological Survey, 1987

    USGS Publications Warehouse

    Snyder, E. F.

    1987-01-01

    Hydrologic data collection activities by the U.S. Geological Survey in Alaska are described. Seventeen projects were active in 1987. Each description includes information on period of project, project chief, funding sources, location, purpose, current status, and published or planned reports. The compilation also contains a bibliography of reports published by the Alaska District from 1984 through 1986. (USGS)

  2. The Implementation of Project and Research Activities in Working with Gifted Children in Terms of School-University Network Cooperation (Regional Aspect)

    ERIC Educational Resources Information Center

    Abdrafikova, Albina R.; Akhmadullina, Rimma M.; Singatullova, Aliya A.

    2014-01-01

    The article deals with regional experience in using modern strategies in teaching gifted children. The value of project and research activity is actualized as one of the most effective educational technologies in work with gifted children. The article shows examples of organization of combined project and research activities of student-teachers…

  3. Children as Agents of Social and Community Change: Enhancing Youth Empowerment through Participation in a School-Based Social Activism Project

    ERIC Educational Resources Information Center

    Torres-Harding, Susan; Baber, Ashley; Hilvers, Julie; Hobbs, Nakisha; Maly, Michael

    2018-01-01

    School-based social activism projects have much potential to foster civic engagement, self-efficacy, and positive youth development. Social activism projects may also be a means by which children, a group that is disempowered due to their age and dependence on adults, might seek to positively impact social and community problems. The current study…

  4. Information Infrastructure Technology and Applications (IITA) Program: Annual K-12 Workshop

    NASA Technical Reports Server (NTRS)

    Hunter, Paul; Likens, William; Leon, Mark

    1995-01-01

    The purpose of the K-12 workshop is to stimulate a cross pollination of inter-center activity and introduce the regional centers to curing edge K-1 activities. The format of the workshop consists of project presentations, working groups, and working group reports, all contained in a three day period. The agenda is aggressive and demanding. The K-12 Education Project is a multi-center activity managed by the Information Infrastructure Technology and Applications (IITA)/K-12 Project Office at the NASA Ames Research Center (ARC). this workshop is conducted in support of executing the K-12 Education element of the IITA Project The IITA/K-12 Project funds activities that use the National Information Infrastructure (NII) (e.g., the Internet) to foster reform and restructuring in mathematics, science, computing, engineering, and technical education.

  5. Physics and Science Education through Project Activities of University Students and Regional Collaboration

    NASA Astrophysics Data System (ADS)

    Hasegawa, Makoto

    A project team "Rika-Kobo" organized by university students has actively performed various science education activities at primary and secondary schools and other educational facilities as well as in science events in local areas. The activities of this student project team are related to various fields of physics and sciences. In order to provide more attractive activities, the student members prepare original experiment tools and easily-understandable presentation and explanation. Through such activities, the members can have opportunities of obtaining new knowledge and refreshing their already-obtained understandings in related fields of physics and sciences. They can also have chances of improving their skills and abilities such as presentation, problem-finding and solving, which are useful for realizing their career development. The activities of the student project team have been also welcomed by children, parents, teachers and other people in local areas because the activities provide them with opportunities of knowing and learning new knowledge in physics and sciences.

  6. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  7. 75 FR 45123 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... proposed projects or to obtain a copy of the information collection plans, call the SAMHSA Reports... effectiveness, efficiency and sustainability of the GBHI project services for client abstinence, housing... the implementation and sustainability of project activities under the GBHI program. Each survey...

  8. 36 CFR 215.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., AND APPEAL PROCEDURES FOR NATIONAL FOREST SYSTEM PROJECTS AND ACTIVITIES § 215.2 Definitions. Address... specific project or activity. Categorically excluded (CE)—Proposed actions, which do not individually or... Responsible Official on a proposed action subject to this part, except for projects requiring an EIS which...

  9. Engineering New Catalysts for In-Process Elimination of Tars

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Felix, Larry G.

    2012-09-30

    The key objective of this project was to develop a new and more efficient methodology for engineering and economically producing optimized robust catalysts for the reduction or elimination of tars in biomass gasification. Whereas current catalyst technology typically disposes thin layers of catalytically-active material onto rigid supports via wet chemistry-based methods, this project investigated novel thermal methods for directly incorporating catalytically active materials onto robust supports as well as novel approaches for incorporating catalytically active materials on and/or within an otherwise inert refractory support material which is then subsequently formed and processed to create a catalytically-active material on all exposedmore » surfaces. Specifically, the focus of this engineered catalyst development was on materials which were derived from, or otherwise related to, olivine-like minerals, due to the inherent attrition resistance and moderate catalytic properties exhibited by natural olivine when used in a fluidized bed biomass gasifier. Task 1 of this project successfully demonstrated the direct thermal impregnation of catalytically-active materials onto an olivine substrate, with the production of a Ni-olivine catalyst. Nickel and nickel oxide were thermally impregnated onto an olivine substrate and when reduced were shown to demonstrate improved catalytic activity over the baseline olivine material and equal the tar-decomposing performance of Ni-olivine catalysts prepared by conventional wet impregnation. Task 2 involved coordination with our subcontracted project partners to further develop and characterize catalyst formulations and to optimize activity and production methods. Within this task, several significant new materials were developed. NexTech Materials developed a sintered ceramic nickel-magnesium-silicate catalyst that demonstrated superb catalytic activity and high resistance to deactivation by H2S. Alfred University developed both supported and integrated (bulk) catalysts via a glass-ceramic processing route which were shown to exhibit excellent catalytic activity and superior resistance to attrition deactivation. With the discovery of these active, robust, glass-based catalysts, and with the permission of the project officer, the investigation of waste-based materials as originally proposed for Task 3 and pilot-scale testing proposed in Task 5 were deferred indefinitely in favor of further investigation of the glass-ceramic based catalyst materials. This choice was justified in part because during FY 2006 and through FY 2007, funding restrictions imposed by congressional budget choices significantly reduced funding for DOE biomass-related projects. Funding for this project was limited to what had been authorized which slowed the pace of project work at GTI so that our project partners could continue in their work. Thereafter, project work was allowed to resume and with restored funding, the project continued and concentrated on the development and testing of glass-ceramic catalysts in bulk or supported formats. Work concluded with a final development devoted to increasing the surface area of glass-ceramic catalysts in the form of microspheres. Following that development, project reporting was completed and the project was concluded.« less

  10. Health Activities Project (HAP): Breathing Fitness Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within this module are teacher and student folios describing four activities which involve students in learning how to measure their…

  11. Health Activities Project (HAP): Sight and Sound Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within this module are teacher and student folios describing six activities which involve students in restricting their vision by…

  12. Health Activities Project (HAP): Heart Fitness and Action Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within the Heart Fitness and Action Module are teacher and student folios describing five activities which involve students in…

  13. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  14. Sensitivity to Pigment-Dispersing Factor (PDF) Is Cell-Type Specific among PDF-Expressing Circadian Clock Neurons in the Madeira Cockroach.

    PubMed

    Gestrich, Julia; Giese, Maria; Shen, Wen; Zhang, Yi; Voss, Alexandra; Popov, Cyril; Stengl, Monika; Wei, HongYing

    2018-02-01

    Transplantation studies have pinpointed the circadian clock of the Madeira cockroach to the accessory medulla (AME) of the brain's optic lobes. The AME is innervated by approximately 240 adjacent neuropeptidergic neurons, including 12 pigment-dispersing factor (PDF)-expressing neurons anterior to the AME (aPDFMEs). Four of the aPDFMEs project contralaterally, controlling locomotor activity rhythms of the night-active cockroach. The present in vitro Ca 2+ imaging analysis focuses on contralaterally projecting AME neurons and their responses to PDF, GABA, and acetylcholine (ACh). First, rhodamine-dextran backfills from the contralateral optic stalk identified contralaterally projecting AME neurons, which were then dispersed in primary cell cultures. After characterization of PDF, GABA, and ACh responses, PDF immunocytochemistry identified ipsilaterally and contralaterally projecting PDFMEs. All PDF-sensitive clock neurons, PDF-immunoreactive clock neurons, and the majority of ipsilaterally and contralaterally projecting cells were excited by ACh. GABA inhibited all PDF-expressing clock neurons, and about half of other ipsilaterally projecting and most contralaterally projecting clock neurons. For the first time, we identified PDF autoreceptors in PDF-secreting cockroach circadian pacemakers. The medium-sized aPDFMEs and all other contralaterally projecting PDF-sensitive clock cells were inhibited by PDF. The ipsilaterally remaining small PDF-sensitive clock cells were activated by PDF. Only the largest aPDFME did not express PDF autoreceptors. We hypothesize that opposing PDF signaling generates 2 different ensembles of clock cells with antiphasic activity, regulating and maintaining a constant phase relationship between rest and activity cycles of the night-active cockroach.

  15. Evaluation of DELTA PREP: A Project Aimed at Integrating Primary Prevention of Intimate Partner Violence Within State Domestic Violence Coalitions

    PubMed Central

    Freire, Kimberley E.; Zakocs, Ronda; Le, Brenda; Hill, Jessica A.; Brown, Pamela; Wheaton, Jocelyn

    2018-01-01

    Background Intimate partner violence (IPV) has been recognized as a public health problem since the late 20th century. To spur IPV prevention efforts nationwide, the DELTA PREP Project selected 19 state domestic violence coalitions to build organizational prevention capacity and catalyze IPV primary prevention strategies within their states. Objective DELTA PREP’s summative evaluation addressed four major questions: (1) Did coalitions improve their prevention capacity during the project period? (2) Did coalitions serve as catalysts for prevention activities within their states during the project period? (3) Was initial prevention capacity associated with the number of prevention activity types initiated by coalitions by the end of the project? (4) Did coalitions sustain their prevention activities 6 months after the end of the project period? Results DELTA PREP achieved its capacity-building goal, with all 19 participant coalitions integrating prevention within their organizations and serving as catalysts for prevention activities in their states. At 6 months follow up, coalitions had sustained almost all prevention activities they initiated during the project. Baseline prevention capacity (Beginner vs. Intermediate) was not associated with the number of prevention activity types coalitions implemented by the end of the project. Conclusion Service and treatment organizations are increasingly asked to integrate a full spectrum of prevention strategies. Selecting organizations that have high levels of general capacity and readiness for an innovation like integrating a public health approach to IPV prevention will likely increase success in building an innovation-specific capacity, and in turn implementing an innovation. PMID:26245932

  16. Evaluation of DELTA PREP: A Project Aimed at Integrating Primary Prevention of Intimate Partner Violence Within State Domestic Violence Coalitions.

    PubMed

    Freire, Kimberley E; Zakocs, Ronda; Le, Brenda; Hill, Jessica A; Brown, Pamela; Wheaton, Jocelyn

    2015-08-01

    Intimate partner violence (IPV) has been recognized as a public health problem since the late 20th century. To spur IPV prevention efforts nationwide, the DELTA PREP Project selected 19 state domestic violence coalitions to build organizational prevention capacity and catalyze IPV primary prevention strategies within their states. DELTA PREP's summative evaluation addressed four major questions: (1) Did coalitions improve their prevention capacity during the project period? (2) Did coalitions serve as catalysts for prevention activities within their states during the project period? (3) Was initial prevention capacity associated with the number of prevention activity types initiated by coalitions by the end of the project? (4) Did coalitions sustain their prevention activities 6 months after the end of the project period? DELTA PREP achieved its capacity-building goal, with all 19 participant coalitions integrating prevention within their organizations and serving as catalysts for prevention activities in their states. At 6 months follow up, coalitions had sustained almost all prevention activities they initiated during the project. Baseline prevention capacity (Beginner vs. Intermediate) was not associated with the number of prevention activity types coalitions implemented by the end of the project. Service and treatment organizations are increasingly asked to integrate a full spectrum of prevention strategies. Selecting organizations that have high levels of general capacity and readiness for an innovation like integrating a public health approach to IPV prevention will likely increase success in building an innovation-specific capacity, and in turn implementing an innovation. © 2015 Society for Public Health Education.

  17. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less

  18. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    NASA Astrophysics Data System (ADS)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  19. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  20. Trends in participation rates for wildlife-associated outdoor recreation activities by age and race/ethnicity: implications for cohort-component projection models

    Treesearch

    John F. Dwyer; Allan Marsinko

    1998-01-01

    Cohort-component projection models have been used to explore the implications of increased aging and growth of racial/ethnic minority groups on number of participants in outdoor recreation activities in the years ahead. Projections usually assume that participation rates by age and race/ethnicity remain constant over time. This study looks at trends in activity...

  1. Directors' Planning Guide. Minority Business Enterprise Project.

    ERIC Educational Resources Information Center

    Burks, Irma P.; And Others

    Designed for use by individuals interested in organizing and planning entrepreneurial activities targeted for youth, this booklet suggests procedures, ideas, and resources for activities that can be sponsored on a limited budget; and addresses the programmatic concerns new project directors may face in getting their projects started. Introductory…

  2. 24 CFR 882.410 - Rent adjustments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... drug-related criminal activity is generally prevalent, and not specific to a particular project, and... primarily as a result of the prevalence of such drug-related activity. HUD may, on a project-by-project...

  3. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  4. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  5. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  6. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  7. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  8. Alberta Education's Computer Technology Project.

    ERIC Educational Resources Information Center

    Thiessen, Jim

    This description of activities initiated through the Computer Technology Project of the provincial education ministry in Alberta, Canada, covers the 2-year period beginning with establishment of the project by the Alberta Department of Education in October 1981. Activities described include: (1) the establishment of the Office of Educational…

  9. 15 CFR 908.4 - Initial report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.4 Initial report. (a) Any person intending to engage in any weather modification project or activity in the United States shall provide a report of his... operator for the project or activity; (2) The following dates for weather modification activities: (i) The...

  10. FL Activities & Festivals.

    ERIC Educational Resources Information Center

    American Council on the Teaching of Foreign Languages, Hastings-on-Hudson, NY.

    A collection of student, class, and school foreign language activities suggests a variety of projects and describes three specific school efforts. The suggested activities include: (1) individual student efforts such as writing to pen-pals; (2) group activities such as a foreign language auction or sing-along; (3) group projects for the school…

  11. Ten years of the project Chain Experiment

    NASA Astrophysics Data System (ADS)

    Susman, Katarina; Ziherl, Saša; Bajc, Jurij

    2017-05-01

    In this paper the project Chain Experiment is presented. It can be viewed as a competition or as a popularization activity for science, technology, and physics in particular. We present the basic idea of a toppling-domino-like chain of contraptions that are operated one after another, and each demonstrates different physical phenomena. The evolution into its current form with three different types of activities is briefly described. The emphasis of the paper is on the impact of the project on physics education. The ways in which physics students, physics teachers, and participating pupils profit from the different project activities are presented in detail.

  12. Natural neural projection dynamics underlying social behavior

    PubMed Central

    Gunaydin, Lisa A.; Grosenick, Logan; Finkelstein, Joel C.; Kauvar, Isaac V.; Fenno, Lief E.; Adhikari, Avishek; Lammel, Stephan; Mirzabekov, Julie J.; Airan, Raag D.; Zalocusky, Kelly A.; Tye, Kay M.; Anikeeva, Polina; Malenka, Robert C.; Deisseroth, Karl

    2014-01-01

    Social interaction is a complex behavior essential for many species, and is impaired in major neuropsychiatric disorders. Pharmacological studies have implicated certain neurotransmitter systems in social behavior, but circuit-level understanding of endogenous neural activity during social interaction is lacking. We therefore developed and applied a new methodology, termed fiber photometry, to optically record natural neural activity in genetically- and connectivity-defined projections to elucidate the real-time role of specified pathways in mammalian behavior. Fiber photometry revealed that activity dynamics of a ventral tegmental area (VTA)-to-nucleus accumbens (NAc) projection could encode and predict key features of social but not novel-object interaction. Consistent with this observation, optogenetic control of cells specifically contributing to this projection was sufficient to modulate social behavior, which was mediated by type-1 dopamine receptor signaling downstream in the NAc. Direct observation of projection-specific activity in this way captures a fundamental and previously inaccessible dimension of circuit dynamics. PMID:24949967

  13. Effects of the Health Activities Project on Student Attitudes toward Health.

    ERIC Educational Resources Information Center

    Sheldon, Daniel S.

    1980-01-01

    The impact of the Health Activities Project (HAP), an activity-centered, supplementary health education program for fifth- to eighth-grade students, on their attitudes toward health education was studied. Results indicated a positive change. (JD)

  14. Inter-organizational collaboration projects in the public sector: a balance between integration and demarcation.

    PubMed

    Löfström, Mikael

    2010-01-01

    For several years, the development of the Swedish public sector has been accompanied by a discussion about inter-organizational collaboration, which has been examined in several national experiments. The experience, however, indicates significant difficulties in implementing collaboration in local authorities' regular activities. This article argues that organizing inter-organizational collaboration in projects tends to be counterproductive, since the purpose of this collaboration is to increase the integration of local authorities. This article is based on case studies of three different collaboration projects. Each project is analyzed in relation to the way collaboration is organized within the project and how the relationship to the local authorities' activities is designed. The outcome of these studies shows that while collaboration projects increase integration between the responsible authorities, the integration stays within the projects. This is due to the fact that the projects were designed as units separate from the responsible authorities. As a result, the collaboration that occurs in the projects is not implemented in the local authorities' activities, and the viability of the increased integration of different responsible authorities does not extend beyond the projects. Copyright (c) 2009 John Wiley & Sons, Ltd.

  15. Wisconsin K-12 Career Education Consortium. Final Project Performance Report. Volume I of Two Volumes.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Public Instruction, Madison.

    To demonstrate career education methods and procedures, seven Wisconsin school districts were chosen to participate in an incremental improvement project. Project activities were conducted district-wide and by individual districts. District-wide dissemination activities involved promoting demonstration packets and assessment/evaluation (AE)…

  16. Video Projects for Elementary and Middle Schools.

    ERIC Educational Resources Information Center

    Kyker, Keith; Curchy, Christopher

    With step-by-step plans for 25 creative curriculum-based video projects, this project guide for elementary and middle school educators facilitates video production. Activities that span the curriculum increase student knowledge in a variety of subjects while building video production skills and putting students in an active role with television.…

  17. 78 FR 38097 - Publication of General License Related to the Syria Sanctions Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... projects to meet basic human needs in Syria, including, but not limited to, drought relief, assistance to... projects; (3) Activities to support education in Syria, including, but not limited to, combating illiteracy, increasing access to education, and assisting education reform projects; (4) Activities to support non...

  18. Creating Student Engagement: The Kickstarter Active Learning Project

    ERIC Educational Resources Information Center

    Manzon, Elliott

    2017-01-01

    Students can become disengaged from marketing material if they cannot see the direct application. Marketing material needs to be applied to a meaningful business task to engage and motivate students. This article introduces the Kickstarter Active Learning Project--an innovative semester-long project in which students create a Kickstarter…

  19. 75 FR 18160 - Small Takes of Marine Mammals Incidental to Specified Activities; Antioch Bridge Seismic Retrofit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... of Marine Mammals Incidental to Specified Activities; Antioch Bridge Seismic Retrofit Project... pile driving associated with the Antioch Bridge Seismic Retrofit Project. DATES: Effective August 15... request from Caltrans to harass marine mammals incidental to the Antioch Bridge Seismic Retrofit Project...

  20. 75 FR 13498 - Small Takes of Marine Mammals Incidental to Specified Activities; Dumbarton Bridge Seismic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... of Marine Mammals Incidental to Specified Activities; Dumbarton Bridge Seismic Retrofit Project... pile driving associated with the Dumbarton Bridge Seismic Retrofit Project. DATES: Effective August 15... request from Caltrans to harass marine mammals incidental to the Dumbarton Bridge Seismic Retrofit Project...

  1. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    NASA Technical Reports Server (NTRS)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  2. Community governance of the Kahnawake Schools Diabetes Prevention Project, Kahnawake Territory, Mohawk Nation, Canada.

    PubMed

    Cargo, Margaret; Lévesque, Lucie; Macaulay, Ann C; McComber, Alex; Desrosiers, Serge; Delormier, Treena; Potvin, Louise

    2003-09-01

    Health promotion emphasizes the importance of community ownership in the governance of community-based programmes, yet little research has been conducted in this area. This study examined perceptions of community ownership among project partners taking responsibility for decision-making related to the Kahnawake Schools Diabetes Prevention Project (KSDPP). Project partners were surveyed cross-sectionally at 18 months (T1) and 60 months (T2) into the project. The perceived influence of each project partner was assessed at T1 and T2 for three domains: (i) KSDPP activities; (ii) KSDPP operations; and (iii) Community Advisory Board (CAB) activities. Project staff were perceived to have the greatest influence on KSDPP activities, KSDPP operations and CAB activities at both T1 and T2. High mean scores of perceived influence for CAB members and community researchers, however, suggests that project decision-making was a shared responsibility among multiple community partners. Although academic researcher influence was consistently low, they were satisfied with their level of influence. This was unlike community affiliates, who were less satisfied with their lower level of influence. In keeping with Kanien'kehaka (Mohawk) culture, the findings suggest a participatory democracy or shared decision-making as the primary mode of governance of KSDPP.

  3. Wiki technology enhanced group project to promote active learning in a neuroscience course for first-year medical students: an exploratory study.

    PubMed

    Mi, Misa; Gould, Douglas

    2014-01-01

    A Wiki group project was integrated into a neuroscience course for first-year medical students. The project was developed as a self-directed, collaborative learning task to help medical students review course content and make clinically important connections. The goals of the project were to enhance students' understanding of key concepts in neuroscience, promote active learning, and reinforce their information literacy skills. The objective of the exploratory study was to provide a formative evaluation of the Wiki group project and to examine how Wiki technology was utilized to enhance active and collaborative learning of first-year medical students in the course and to reinforce information literacy skills.

  4. Student and Community Engagement in Earth, Space, and Environmental Sciences Through Experiential Learning and Citizen Science as Part of Research Broader Impact

    NASA Astrophysics Data System (ADS)

    Ibrahim, Alaa; Ahmed, Yasmin

    2015-04-01

    Fulfilling the broader impact of a research project in Earth and environmental sciences is an excellent opportunity for educational and outreach activities that connect scientists and society and enhance students and community engagement in STEM fields in general and in Earth, space, and environmental sciences in particular. Here we present the experience developed in this endeavor as part of our Partnerships for Enhanced Engagement in Research (PEER) project sponsored by USAID/NSF/NAS. The project introduced educational and outreach activities that included core curriculum course development for university students from all majors, community-based learning projects, citizen science and outreach programs to school students and community members. Through these activities, students worked with the project scientists on a variety of activities that ranged from citizen science and undergraduate research to run mass experiments that measure the quality of air, drinking water, and ultraviolet level in greater Cairo, Egypt, to community awareness campaigns through the production of short documentaries and communicating them with stakeholders and target groups, including schools and TV stations. The activities enhanced students learning and the public awareness on climate change and the underlying role of human activities. It also connected effectively the project scientists with college and university students a well as the wider segments of the society, which resulted in a host of benefits including better scientific literacy and appreciation to the role of scientists, promoting scientists as role models, sharing the values of science, and motivating future generations to puruse a career in science This work is part of the PEER research project 2-239 sponsored by USAID/NSF/NAS Project Link (at National Academies website): http://sites.nationalacademies.org/PGA/dsc/peerscience/PGA_084046.htm website: http://CleanAirEgypt.org Links to cited work: Core Curriculum Course: http://bit.ly/FutureLife Citizen Science Project: Quality of Air, Drinking Water, and U.V. Level in Greater Cairo: Map 1: http://bit.ly/AirWaterLightMap1 Map 2: http://bit.ly/AirWaterLightMap2 Short Documentaries Student Projects: https://vimeo.com/science2society/videos Project video: https://vimeo.com/100427525

  5. Student and Community Engagement in Earth, Space, and Environmental Sciences Through Experiential Learning and Citizen Science as Part of Research Broader Impact

    NASA Astrophysics Data System (ADS)

    Ibrahim, A. I.; Tutwiler, R.; Zakey, A.; Shokr, M. E.; Ahmed, Y.; Jereidini, D.; Eid, M.

    2014-12-01

    Fulfilling the broader impact of a research project in Earth and environmental sciences is an excellent opportunity for educational and outreach activities that connect scientists and society and enhance students and community engagement in STEM fields in general and in Earth, space, and environmental sciences in particular. Here we present the experience developed in this endeavor as part of our Partnerships for Enhanced Engagement in Research (PEER) project sponsored by USAID/NSF/NAS. The project introduced educational and outreach activities that included core curriculum course development for university students from all majors, community-based learning projects, citizen science and outreach programs to school students and community members. Through these activities, students worked with the project scientists on a variety of activities that ranged from citizen science and undergraduate research to run mass experiments that measure the quality of air, drinking water, and ultraviolet level in greater Cairo, Egypt, to community awareness campaigns through the production of short documentaries and communicating them with stakeholders and target groups, including schools and TV stations. The activities enhanced students learning and the public awareness on climate change and the underlying role of human activities. It also connected effectively the project scientists with college and university students a well as the wider segments of the society, which resulted in a host of benefits including better scientific literacy and appreciation to the role of scientists, promoting scientists as role models, sharing the values of science, and motivating future generations to puruse a career in science Note: This presentation is a PEER project sponsored by USAID/NSF/NAS Project Link (at National Academies website): http://sites.nationalacademies.org/PGA/dsc/peerscience/PGA_084046.htmwebsite: http://CleanAirEgypt.orgLinks to cited work: Core Curriculum Course: http://bit.ly/FutureLife Citizen Science Project: Quality of Air, Drinking Water, and U.V. Level in Greater Cairo: Map 1: http://bit.ly/AirWaterLightMap1 Map 2: http://bit.ly/AirWaterLightMap2 Short Documentaries Student Projects: https://vimeo.com/science2society/videos Project video: http://CleanAirEgypt.org

  6. Grassroots projects aimed at the built environment: Association with neighbourhood deprivation, land-use mix and injury risk to road users.

    PubMed

    Dubé, Anne Sophie; Beausoleil, Maude; Gosselin, Céline; Beaulme, Ginette; Paquin, Sophie; Pelletier, Anne; Goudreau, Sophie; Poirier, Marie-Hélène; Drouin, Louis; Gauvin, Lise

    2014-07-09

    1) To describe grassroots projects aimed at the built environment and associated with active transportation on the Island of Montreal; and 2) to examine associations between the number of projects and indicators of neighbourhood material and social deprivation and the built environment. We identified funding agencies and community groups conducting projects on built environments throughout the Island of Montreal. Through website consultation and a snowballing procedure, we inventoried projects that aimed at transforming built environments and that were carried out by community organizations between January 1, 2006, and November 1, 2010. We coded and validated information about project activities and created an interactive map using Geoclip software. Correlational analyses quantified associations between number of projects, neighbourhood characteristics and deprivation. A total of 134 community organizations were identified, and 183 grassroots projects were inventoried. A large number of projects were aimed at increasing awareness of/improving active or public transportation (n=95), improving road safety (n=84) and enhancing neighbourhood beautification and greening (n=69). The correlation between the presence of projects and the extent of neighbourhood material deprivation was small (Kendall's t=0.26, p<0.001), but in areas with greater social deprivation there were more projects (Kendall's t=0.38, p<0.001). Larger numbers of projects were also associated with the presence of more extensive land-use mix (Kendall's t=0.23, p<0.001) and a greater proportion of road intersections with injured pedestrians, cyclists and motor vehicle users (Kendall's t=0.43, p<0.001). There is significant community mobilization around built environments and active transportation. Investigations of the implementation processes and impacts are warranted.

  7. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  8. Project WET: Curriculum & Activity Guide. K-12.

    ERIC Educational Resources Information Center

    Nelson, Dennis; And Others

    Project WET (Water Education for Teachers) is a nonprofit water education program for educators and young people. This curriculum and activity guide for kindergarten through twelfth grades is a collection of innovative, water-related activities that are hands-on, easy to use, and fun. The activities incorporate a variety of formats such as large…

  9. ECUT: Energy Conversion and Utilization Technologies program. Biocatalysis project

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of Universities, Industrial Companies and Government Research Laboratories. The Project's technical activities were organized into three work elements: molecular modeling and applied genetics; bioprocess engineering; and bioprocess design and assessment.

  10. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

  11. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

  12. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

  13. Project Target: Criterion-Referenced Physical Fitness Standards for Adolescents with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    This final report discusses the outcomes of a project designed to extend the nation's current emphasis on health-related, criterion-referenced fitness testing and programming to children and adolescents with disabilities. It summarizes project activities leading up to the Brockport Physical Fitness Test and related measures. Activities included:…

  14. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  15. Final Report of Project CHOICE: A Center for Helping Organizations Improve Choice in Education.

    ERIC Educational Resources Information Center

    Chapman, Davis W.; And Others

    The purpose of the Center for Helping Organizations Improve Choice in Education (CHOICE) project, the scope of its activities, and evaluations of the effectiveness of those activities are described. One major project goal was to encourage and facilitate institutional efforts to provide more complete and accurate information to prospective…

  16. Youth Leadership Development through School-Based Civic Engagement Activities: A Case Study

    ERIC Educational Resources Information Center

    Horstmeier, Robin Peiter; Ricketts, Kristina G.

    2009-01-01

    Leadership development through a civic engagement activity in a local FFA chapter is explored. Through a case study design, researchers illuminate a project that encouraged youth leadership development through the creation and execution of a civic engagement project in their own local community. Holistically, FFA members viewed the project as a…

  17. Development and Evaluation of an Undergraduate Multidisciplinary Project Activity in Engineering and Design

    ERIC Educational Resources Information Center

    Smith, David R.; Cole, Joanne

    2012-01-01

    The School of Engineering and Design Multidisciplinary Project (MDP) at Brunel University is a one week long project based activity involving first year undergraduate students from across the School subject areas of Electronic and Computer Engineering, Mechanical Engineering, Civil Engineering and Design. This paper describes the main aims of the…

  18. Project Wild and the Dominant Western Paradigm: A Content Analysis Utilizing Deep Ecology.

    ERIC Educational Resources Information Center

    Ingraham, Blake

    Environmental educators utilize activity guides as a primary method of diffusing environmental education material into educational settings. The most popular environmental education activity guide in use today is Project WILD. Project WILD has come under fire by various groups, especially animal rights groups. Accordingly, a content analysis study…

  19. Active Learning through Role Playing: Virtual Babies in a Child Development Course

    ERIC Educational Resources Information Center

    Poling, Devereaux A.; Hupp, Julie M.

    2009-01-01

    The authors designed an active learning project for a child development course in which students apply core concepts to a hypothetical baby they "raise" during the term. Students applied developmental topics to their unique, developing child. The project fostered student learning and enthusiasm for the material. The project's versatility makes it…

  20. 76 FR 62400 - Agency Information Collection Activities; Proposed Collection; Comment Request; Focus Groups as...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Activities; Proposed Collection; Comment Request; Focus Groups as Used by EPA for Economics Projects (Renewal... used by EPA for Economics Projects (Renewal). ICR numbers: EPA ICR No. 2205.07, OMB Control No. 2090... interviews (hereafter jointly referred to as focus groups) related to economics projects. Over the next three...

  1. National Evaluation of the State Deaf-Blind Projects. NCEE 2018-4006

    ERIC Educational Resources Information Center

    Daley, Tamara C.; Edwards, Jessica; Fiore, Thomas A.; Johnson, Laura

    2018-01-01

    This report describes the work done by the 48 State Deaf-Blind Projects awarded grants by the Department of Education's Office of Special Education Programs (OSEP) in late 2013. The report documents the technical assistance and dissemination activities carried out by the Projects and their collaborative activities, describes the needs for…

  2. Exploring a Monetary Union among Nations through Active Learning

    ERIC Educational Resources Information Center

    Goma, Ophelia D.

    2002-01-01

    This article presents a classroom project that employs various techniques of active learning including role-playing, collaborative group work and writing. The project explores the recent creation of the European Monetary Union (EMU) with special emphasis on the introduction of the euro. The project assumes that the Americas have begun preliminary…

  3. NASA's University Program: Active projects, fiscal year 1981

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Active university R and D activities funded by NASA which contribute to mission needs are documented. Technical rather than fiscal information is emphasized. A classification of government sponsored research is included. A cross index providing access to the project description is also included.

  4. 76 FR 69331 - Proposed Collection; Comment Request for Regulation Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... information collection requirements related to income attributable to domestic production activities. DATES... Production Activities. OMB Number: 1545-1966. Regulation Project Number: T.D. 9263, as corrected by... deduction for income attributable to domestic production activities. A taxpayer receiving certain patronage...

  5. Production report: enhanced recovery. [Combustion, steam, soak steam drive, polymer and caustic, micellar/surfactant miscible hydrocarbons and CO/sub 2/

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noran, D.

    Schemes for producing additional oil using enhanced-recovery (ER) methods are under way throughout the world. The extent and intensity of ER activity is highest in the U.S. with 156 projects, about two-thirds of which are thermal. Venezuela has a strong ER commitment with at least 70 active projects, with a major thrust on steam soak. Significant projects, but limited in number, are under way in Canada, North Africa, Southeast Asia, and elsewhere in Latin America. A breakdown of active U.S. ER projects for 1970, 1973, and 1975 is tabulated for combustion, steam soak, steam drive, polymer and caustic, micellar/surfactant, misciblemore » hydrocarbon, and CO/sub 2/ methods. This Oil and Gas Journal Survey includes seven articles; the first six were prepared by David Noran, Journal Production Editor. The final article on Venezuelan activity was written by Alvaro Franco, Editor and Publisher, Petroleo Internacional. The articles are entitled: U.S. Thermal Recovery Activity Growing Steadily; Operators Accelerate Testing of Micellar/Surfactant Potential; Polymer and Caustic Methods on Rebound; Gas Miscible Projects Move at Slow Pace; Canadian Enhanced-Recovery Activity Moderate, Centers on Thermal Projects; Other Global Enhanced-Recovery Work Sparse; and Thermal Work Humming in Venezuela. Detailed information on each method is tabulated for each article. (MCW)« less

  6. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  7. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  8. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  9. Building Ecological and Community Resilience and Measuring Success of the Department of Interior Hurricane Sandy Resilience Projects

    NASA Astrophysics Data System (ADS)

    Taylor, S. M.; Worman, S. L.; Bennett, R.; Bassow, A.

    2017-12-01

    The Department of the Interior (DOI) partnered with the National Fish and Wildlife Foundation (NFWF) to administer an external funding competition to support coastal resilience projects in the region affected by Hurricane Sandy. The projects complement the DOI Bureau-led projects, but are led by state and local governments, universities, non-profits, community groups, tribes, and other non-Federal entities. In total, the Hurricane Sandy Resilience Program invested over $750 million in approximately 180 projects to repair damage and improve the resilience of habitats, communities and infrastructure to future storms and sea level rise. Project activities include waterway connection and opening, living shoreline, marsh restoration, community resilience planning, data/mapping/modeling, and beach and dune restoration. DOI and NFWF initiated a resilience assessment in 2015 to evaluate the impact of this investment. The assessment began by clarifying the program's resilience goals and the development of ecological and socio-economic metrics across the project activities. Using these metrics, the evaluation is assessing the ecological and community outcomes, cost effectiveness of activities, improved scientific understanding, and temporal and spatial scaling of benefits across resilience activities. Recognizing the unique opportunity afforded by the scale and distribution of projects, NFWF and DOI have invested in monitoring through 2024 to better understand how these projects perform over time. This presentation will describe the evaluation questions, approach, long-term monitoring, online metrics portal, and findings to date.

  10. An impact evaluation of the safe motherhood promotion project in Bangladesh: evidence from Japanese aid-funded technical cooperation.

    PubMed

    Kamiya, Yusuke; Yoshimura, Yukie; Islam, Mohammad Tajul

    2013-04-01

    This paper reports the findings from a quasi-experimental impact evaluation of the Safe Motherhood Promotion Project (SMPP) conducted in the Narsingdi district of Bangladesh. SMPP is a Japanese aid-funded technical cooperation project aimed at developing local capacities to tackle maternal and newborn health problems in rural areas. We assessed whether the project interventions, in particular, community-based activities under the Model Union approach, had a favorable impact on women's access to and knowledge of maternal health care during pregnancy and childbirth. The project comprises a package of interlinked interventions to facilitate safe motherhood practices at primary and secondary care levels. The primary-level activities focused on community mobilization through participatory approaches. The secondary-level activities aimed at strengthening organizational and personnel capacities for delivering emergency obstetric care (EmOC) at district and sub-district level hospitals. The project impact was estimated by difference-in-differences logistic regressions using two rounds of cross-sectional household survey data. The results showed that the project successfully increased the utilization of antenatal visits and postpartum EmOC services and also enhanced women's knowledge of danger signs during pregnancy and delivery. The project also reduced income inequalities in access to antenatal care. In contrast, we found no significant increase in the use of skilled birth attendants (SBA) in the project site. Nonetheless, community mobilization activities and the government's voucher scheme played a complementary role in promoting the use of SBA. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Interactive lecture demonstrations, active learning, and the ALOP project

    NASA Astrophysics Data System (ADS)

    Lakshminarayanan, Vasudevan

    2011-05-01

    There is considerable evidence from the physics education literature that traditional approaches are ineffective in teaching physics concepts. A better teaching method is to use the active learning environment, which can be created using interactive lecture demonstrations. Based on the active learning methodology and within the framework of the UNESCO mandate in physics education and introductory physics, the ALOP project (active learning in optics and photonics) was started in 2003, to provide a focus on an experimental area that is adaptable and relevant to research and educational conditions in many developing countries. This project is discussed in this paper.

  12. Novel and Improved Nanomaterials, Chemistries and Apparatus for Nanobiotechnology: the NACBO project.

    PubMed

    Bruce, Ian James

    2011-02-01

    This article outlines the nature and activities of the recently completed EU Framework Programme 6 Integrated Project, Novel and Improved Nanomaterials, Chemistries and Apparatus for Nanobiotechnology (NACBO). This project was designed to yield new nanomaterials, surface activation and synthetic nucleic acid chemistries, procedures and hardware for applications in forensics and diagnostics. It provides details on the project's structure and partnership along with its principal objectives and successes in terms of publications and commercial exploitation.

  13. Hands-On Life Science Activities for Middle Schools. Teacher's Edition. First Edition.

    ERIC Educational Resources Information Center

    Newman, Barbara; Kramer, Stephanie

    This book provides 50 enrichment activities for the science curriculum that provide concrete connections with important world events. Each activity is self-contained and provides everything the student needs to gain a basic understanding of a concept or to work through a project. The activities include innovative and traditional projects for both…

  14. Preparing Students for Democratic Citizenship in a Multicultural Society: Engaging Diversity through Project Mosaik

    ERIC Educational Resources Information Center

    Zúñiga, Ximena; Nelson Laird, Thomas F.; Mitchell, Tania D.

    2015-01-01

    This study examines whether participation in a diversity initiative, Project MosaiK, helped prepare students to engage and actively address social justice issues in their residence halls. After controlling for background characteristics, findings suggest that the more students participated in Project MosaiK activities, the more likely they were to…

  15. Project Destiny: Initiating Physical Activity for Nonathletic Girls through Sport

    ERIC Educational Resources Information Center

    Kyles, Carli; Lounsbery, Monica

    2004-01-01

    The purpose of this article is to emphasize the need to develop unique physical activity and sport programs that specifically target the participation of nonathletic and nonactive girls. In addition, the authors provide an overview of an example of one such program, Project Destiny. A description of Project Destiny is provided in terms of its…

  16. Peer Evaluation in Blended Team Project-Based Learning: What Do Students Find Important?

    ERIC Educational Resources Information Center

    Lee, Hye-Jung; Lim, Cheolil

    2012-01-01

    Team project-based learning is reputed to be an appropriate way to activate interactions among students and to encourage knowledge building through collaborative learning. Peer evaluation is an effective way for each student to participate actively in a team project. This article investigates the issues that are important to students when…

  17. Students Opinions and Attitudes toward LGBT Persons and Rights: Results of a Transnational European Project

    ERIC Educational Resources Information Center

    Passani, Antonella; Debicki, Marie

    2016-01-01

    This article presents the research results of the European co-funded project NISO: Fighting Homophobia Through Active Citizenship and Media Education. The project combined research and non-formal education activities in four European countries: Belgium, Estonia, Italy and the Netherlands. The research intended to identify and analyze high school…

  18. Investigation the Scientific Creativity of Gifted Students through Project-Based Activities

    ERIC Educational Resources Information Center

    Karademir, Ersin

    2016-01-01

    In this research, it is aimed to identify the scientific creativity of gifted students through project-based activities. In accordance with this purpose, a study has been carried out with 13 gifted students studying in third and fifth grade. In the study, students have been informed about the project development stages and they have been asked…

  19. "Infotectives" on the "Infobahn": Designing Internet-Aided Projects for the Social Studies Classroom.

    ERIC Educational Resources Information Center

    Maskin, Melvin R.

    1996-01-01

    Describes three social studies projects tackled by students at the Bronx High School of Science: an extracredit activity on doing business in Manhattan, a citizen-participation project on fixing the United States, and a cooperative activity to identify problems common to Tokyo and New York City. Using the Internet to solve real-world problems…

  20. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    ERIC Educational Resources Information Center

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  1. Astroaccesible: Bringing the study of the Universe to the visually impaired

    NASA Astrophysics Data System (ADS)

    Pérez-Montero, E.; García Gómez-Caro, E.; Sánchez Molina, Y.; Ortiz-Gil, A.; López de Lacalle, S.; Tamayo, A.

    2017-03-01

    Astroaccesible is an outreach project carried out in collaboration with the IAA-CSIC and ONCE to make astronomy more accessible to the visually impaired people so the main source of information is not based on the use of images. The activities of the project started in 2014 and since then it has received financial support from SEA in 2015 and from FECYT in 2016 making possible to extend the activity for many ONCE centres in Spain. The activities include in-person classes using adequate descriptions, high-contrast images for those people with visual remain and touching material representing basic concepts about sizes, scales and distances of astronomical bodies. To maximize the impact of the contents of the project many of the contents, summary of activities, links to resources are available through the web page of the project. This project focused on astronomy is also intended to make the scientific community more sensitive to perform more accessible explanations of their results.

  2. 24 CFR 1003.204 - Special activities by Community-Based Development Organizations (CBDOs).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... activities that increase economic opportunity, principally for persons of low- and moderate-income, or that stimulate or retain businesses or permanent jobs, including projects that include one or more such... jobs; (3) Energy conservation project includes activities that address energy conservation, principally...

  3. Outdoor recreation

    Treesearch

    J. M. Bowker; Ashley Askew; H. Ken Cordell; John C. Bergstrom

    2013-01-01

    Key FindingsBy 2060, the number of southern adults participating in each of 10 different popular outdoor recreation activities is projected to increase. Depending on future demographic, economic, land use, and population changes, the activity demonstrating the least growth in participants is hunting (8–25 percent). The activity projected to...

  4. 30 CFR 1228.107 - Eligible cost of activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and other normal administrative activities in direct support of the project or projects; basic and... the procedures, timing, and mechanics for implementing Federal funding. [49 FR 37348, Sept. 21, 1984...

  5. 30 CFR 228.107 - Eligible cost of activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and other normal administrative activities in direct support of the project or projects; basic and... the procedures, timing, and mechanics for implementing Federal funding. [49 FR 37348, Sept. 21, 1984...

  6. 30 CFR 1228.107 - Eligible cost of activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., and other normal administrative activities in direct support of the project or projects; basic and... the procedures, timing, and mechanics for implementing Federal funding. [49 FR 37348, Sept. 21, 1984...

  7. 30 CFR 1228.107 - Eligible cost of activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., and other normal administrative activities in direct support of the project or projects; basic and... the procedures, timing, and mechanics for implementing Federal funding. [49 FR 37348, Sept. 21, 1984...

  8. A Structured Process Description of a Pragmatic Implementation Project: Improving Integrated Care for Older Persons in Residential Care Homes

    PubMed Central

    Poot, Antonius J.; de Waard, Claudia S.; Wind, Annet W.; Caljouw, Monique A. A.; Gussekloo, Jacobijn

    2017-01-01

    Evaluation of the implementation of integrated care can differ from trial-based research due to complexity. Therefore, we examined whether a theory-based method for process description of implementation can contribute to improvement of evidence-based care. MOVIT, a Dutch project aimed at implementing integrated care for older vulnerable persons in residential care homes, was used as a case study. The project activities were defined according to implementation taxonomy and mapped in a matrix of theoretical levels and domains. Project activities mainly targeted professionals (both individual and group). A few activities targeted the organizational level, whereas none targeted the policy level, or the patient, or the “social, political, and legal” domains. However, the resulting changes in care delivery arrangement had consequences for professionals, patients, organizations, and the social, political, and legal domains. A structured process description of a pragmatic implementation project can help assess the fidelity and quality of the implementation, and identify relevant contextual factors for immediate adaptation and future research. The description showed that, in the MOVIT project, there was a discrepancy between the levels and domains targeted by the implementation activities and those influenced by the resulting changes in delivery arrangement. This could have influenced, in particular, the adoption and sustainability of the project. PMID:29161944

  9. A Structured Process Description of a Pragmatic Implementation Project: Improving Integrated Care for Older Persons in Residential Care Homes.

    PubMed

    Poot, Antonius J; de Waard, Claudia S; Wind, Annet W; Caljouw, Monique A A; Gussekloo, Jacobijn

    2017-01-01

    Evaluation of the implementation of integrated care can differ from trial-based research due to complexity. Therefore, we examined whether a theory-based method for process description of implementation can contribute to improvement of evidence-based care. MOVIT, a Dutch project aimed at implementing integrated care for older vulnerable persons in residential care homes, was used as a case study. The project activities were defined according to implementation taxonomy and mapped in a matrix of theoretical levels and domains. Project activities mainly targeted professionals (both individual and group). A few activities targeted the organizational level, whereas none targeted the policy level, or the patient, or the "social, political, and legal" domains. However, the resulting changes in care delivery arrangement had consequences for professionals, patients, organizations, and the social, political, and legal domains. A structured process description of a pragmatic implementation project can help assess the fidelity and quality of the implementation, and identify relevant contextual factors for immediate adaptation and future research. The description showed that, in the MOVIT project, there was a discrepancy between the levels and domains targeted by the implementation activities and those influenced by the resulting changes in delivery arrangement. This could have influenced, in particular, the adoption and sustainability of the project.

  10. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  11. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacobsen, P.H.

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  12. Enhancements to and Applications with the "Unified" Long-Term PSC Database

    NASA Technical Reports Server (NTRS)

    Fromm, Michael; Alfred, Jerome

    2004-01-01

    This report summaries the project team's activity during the period 1 January - 31 March 2004. It consists of a project plan, which was completed during this period and an indication of the completion status of each phase of the project. The intention of the investigative team is to closely follow the statement of work documented in our proposal. For this reason, the proposal may be referenced in this and upcoming status reports. This project got underway in this quarter. Our activity was to formulate a project plan and to engage in planning meetings with collaborators.

  13. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  14. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  15. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  16. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  17. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  18. In the Style of Henry Moore

    ERIC Educational Resources Information Center

    Hinshaw, Craig

    2010-01-01

    In this article, the author describes an art project inspired by Henry Moore's sculptures. This project consists of two activities. In the first activity, students select, sand and stain a wood block that would become a base for their plaster sculpture. This activity would keep the students independently engaged (classroom management) while the…

  19. Individualized Instruction in Science, Earth-Space Project, Self-Directed Activities.

    ERIC Educational Resources Information Center

    Kuczma, R. M.

    As a supplement to Learning Activity Packages (LAP) of the earth-space project, this manual presents self-directed activities especially designed for individualized instruction. Besides an introduction to LAP characteristics, sets of instructions are given in connection with the metric system, the earth's dimensions, indirect evidence for atomic…

  20. 77 FR 3784 - Recreational Boating Safety Projects, Programs and Activities Funded Under Provisions of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... 21st Century; Accounting of ACTION: Notice. SUMMARY: In 1999, the Transportation Equity Act for the... detailed accounting of the projects, programs, and activities funded under the national recreational... fiscal year 2011 for each activity is shown below. Specific Accounting of Funds National Recreational...

  1. Active Students in Webinars

    ERIC Educational Resources Information Center

    Kolås, Line; Nordseth, Hugo; Yri, Jørgen Sørlie

    2015-01-01

    To ensure student activity in webinars we have defined 10 learning tasks focusing on production and communication e.g. collaborative writing, discussion and polling, and investigated how the technology supports the learning activities. The three project partners in the VisPed-project use different video-conferencing systems, and we analyzed how it…

  2. An Overview of Follow-On Testing Activities of the A-3 Subscale Diffuser Test Project

    NASA Technical Reports Server (NTRS)

    Ryan, James E.

    2009-01-01

    An overview of NASA Stennis Space Center's (SSC) A-3 Subscale Diffuser Test (SDT) Project is presented. The original scope of the SDT Project, conducted from April 2007 to January 2008, collected data to support mitigation of risk associated with design and procurement activities of the A-3 Test Stand Project, an effort to construct a simulated altitude test facility at SSC in support of NASA's Constellation Program. Follow-on tests were conducted from May 2008 through August 2009, utilizing the SDT test setup as a testbed for additional risk mitigation activities. Included are descriptions of the Subscale Diffuser (SD) test article, the test facility configuration, and test approaches.

  3. Multirate Flutter Suppression System Design for the Benchmark Active Controls Technology Wing. Part 1; Theory and Design Procedure

    NASA Technical Reports Server (NTRS)

    Mason, Gregory S.; Berg, Martin C.; Mukhopadhyay, Vivek

    2002-01-01

    To study the effectiveness of various control system design methodologies, the NASA Langley Research Center initiated the Benchmark Active Controls Project. In this project, the various methodologies were applied to design a flutter suppression system for the Benchmark Active Controls Technology (BACT) Wing. This report describes a project at the University of Washington to design a multirate suppression system for the BACT wing. The objective of the project was two fold. First, to develop a methodology for designing robust multirate compensators, and second, to demonstrate the methodology by applying it to the design of a multirate flutter suppression system for the BACT wing.

  4. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    PubMed

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  5. Project REAL (Real Educational Activities of Learning)

    ERIC Educational Resources Information Center

    Lindsay, Dolores

    1977-01-01

    Project REAL (Real Educational Activities of Learning) began as a program for 22 handicapped high school dropouts under age 21 and offered practical instruction in such areas as construction, electronic assembly, and merchandising. (JYC)

  6. Combining Active Learning with Service Learning: A Student-Driven Demonstration Project.

    ERIC Educational Resources Information Center

    Hatcher-Skeers, Mary; Aragon, Ellen

    2002-01-01

    Describes a project that integrates active learning into service learning targeting both college students and middle schools students wherein college students perform chemical demonstrations for middle school students. (YDS)

  7. AgRP Neurons Control Systemic Insulin Sensitivity via Myostatin Expression in Brown Adipose Tissue.

    PubMed

    Steculorum, Sophie M; Ruud, Johan; Karakasilioti, Ismene; Backes, Heiko; Engström Ruud, Linda; Timper, Katharina; Hess, Martin E; Tsaousidou, Eva; Mauer, Jan; Vogt, Merly C; Paeger, Lars; Bremser, Stephan; Klein, Andreas C; Morgan, Donald A; Frommolt, Peter; Brinkkötter, Paul T; Hammerschmidt, Philipp; Benzing, Thomas; Rahmouni, Kamal; Wunderlich, F Thomas; Kloppenburg, Peter; Brüning, Jens C

    2016-03-24

    Activation of Agouti-related peptide (AgRP) neurons potently promotes feeding, and chronically altering their activity also affects peripheral glucose homeostasis. We demonstrate that acute activation of AgRP neurons causes insulin resistance through impairment of insulin-stimulated glucose uptake into brown adipose tissue (BAT). AgRP neuron activation acutely reprograms gene expression in BAT toward a myogenic signature, including increased expression of myostatin. Interference with myostatin activity improves insulin sensitivity that was impaired by AgRP neurons activation. Optogenetic circuitry mapping reveals that feeding and insulin sensitivity are controlled by both distinct and overlapping projections. Stimulation of AgRP → LHA projections impairs insulin sensitivity and promotes feeding while activation of AgRP → anterior bed nucleus of the stria terminalis (aBNST)vl projections, distinct from AgRP → aBNSTdm projections controlling feeding, mediate the effect of AgRP neuron activation on BAT-myostatin expression and insulin sensitivity. Collectively, our results suggest that AgRP neurons in mice induce not only eating, but also insulin resistance by stimulating expression of muscle-related genes in BAT, revealing a mechanism by which these neurons rapidly coordinate hunger states with glucose homeostasis. Copyright © 2016 Elsevier Inc. All rights reserved.

  8. Healthy Eating and Physical Activity in Schools in Europe: A Toolkit for Policy Development and Its Implementation

    ERIC Educational Resources Information Center

    Simovska, Venka; Dadaczynski, Kevin; Woynarowska, Barbara

    2012-01-01

    Purpose: The purpose of this paper is to introduce the HEPS project ("H"ealthy "E"ating and "P"hysical Activity in "S"chools) and discuss initial steps of the project implementation within EU countries. On the basis of the Health Promoting School approach as a conceptual foundation for the project, HEPS…

  9. Transition from Compulsory and Upper Secondary School to Further Education or Employment--the GUARANTEE Project.

    ERIC Educational Resources Information Center

    School Research Newsletter, 1984

    1984-01-01

    In late summer l979 the GUARANTEE project was launched in Sweden to gather information on activities to combat youth unemployment and on followup and other activities within the scope of municipal followup responsibilities. The project was organized in the form of a case study of nine municipalities. The first three years were concerned mainly…

  10. Evaluating Introductory Physics Classes in Light of the ABET Criteria: An Example from the SCALE-UP Project.

    ERIC Educational Resources Information Center

    Saul, Jeffery M.; Deardorff, Duane L.; Abbott, David S.; Allain, Rhett J.; Beichner, Robert J.

    The Student-Centered Activities for Large Enrollment University Physics (SCALE-UP) project at North Carolina State University (NCSU) is developing a curriculum to promote learning through in-class group activities in introductory physics classes up to 100 students. The authors are currently in Phase II of the project using a specially designed…

  11. Model Wind Turbine Design in a Project-Based Middle School Engineering Curriculum Built on State Frameworks

    ERIC Educational Resources Information Center

    Cogger, Steven D.; Miley, Daniel H.

    2012-01-01

    This paper proposes that project-based active learning is a key part of engineering education at the middle school level. One project from a comprehensive middle school engineering curriculum developed by the authors is described to show how active learning and state frameworks can coexist. The theoretical basis for learning and assessment in a…

  12. U.S. Outdoor Recreation Participation Projections to 2060

    Treesearch

    J.M. Bowker; Ashley Askew

    2012-01-01

    In this chapter, we develop and present national outdoor recreation participation projections for 17 recreation activities or activity composites through 2060. (The projections are for the population of Americans age 16 and older, referred to hereafter in this section as “adults.”) This charge is consistent with the Forest and Rangeland Renewable Resources Planning Act...

  13. Best Practices in Prevention: A Curriculum on Alcohol, Tobacco and Other Drugs, and Violence. Grades 6 and 7. Life Skills Component. Project Oz.

    ERIC Educational Resources Information Center

    Bilyk-Glancy, Joanne; Caison, Shelia; Campbell, Melissa; Carlton, Chris; Dobbins, Mike; Menkhaus, Lisa; Nappi, Beth; Payne, Sue; Rankaitis, Peter; Sutton, Arthur; Wisted, Nancy

    Project Oz is a not-for-profit special services agency providing drug education and crisis intervention services. Project Oz curricula provide compact and well-researched information for teachers, supplemented by student learning activities that reinforce the lecture portions of the topic. These activities are grade-appropriate and incorporate…

  14. Best Practices in Prevention: A Curriculum on Alcohol, Tobacco and Other Drugs, and Violence. Grades 6 and 7. Violence Prevention Component. Project Oz.

    ERIC Educational Resources Information Center

    Bilyk-Glancy, Joanne; Caison, Shelia; Campbell, Melissa; Carlton, Chris; Dobbins, Mike; Menkhaus, Lisa; Nappi, Beth; Payne, Sue; Rankaitis, Peter; Sutton, Arthur; Wisted, Nancy

    Project Oz is a not-for-profit special services agency providing drug education and crisis intervention services. Project Oz curricula provide compact and well-researched information for teachers, supplemented by student learning activities that reinforce the lecture portions of the topic. These activities are grade-appropriate and incorporate…

  15. Best Practices in Prevention: A Curriculum on Alcohol, Tobacco and Other Drugs, and Violence. Grades 6 and 7. Drug Education Component. Project Oz.

    ERIC Educational Resources Information Center

    Bilyk-Glancy, Joanne; Caison, Shelia; Campbell, Melissa; Carlton, Chris; Dobbins, Mike; Menkhaus, Lisa; Nappi, Beth; Payne, Sue; Rankaitis, Peter; Sutton, Arthur; Wisted, Nancy

    Project Oz is a not-for-profit special services agency providing drug education and crisis intervention services. Project Oz curricula provide compact and well-researched information for teachers, supplemented by student learning activities that reinforce the lecture portions of the topic. These activities are grade-appropriate and incorporate…

  16. Best Practices in Prevention: A Curriculum on Alcohol, Tobacco and Other Drugs, and Violence. Grades 4 and 5. Violence Component. Project Oz.

    ERIC Educational Resources Information Center

    Bilyk-Glancy, Joanne; Carlton, Chris; Dobbins, E. Mike; Fisher, Barbara; Menkhaus, Lisa

    Project Oz is a not-for-profit special services agency providing drug education and crisis intervention services. Project Oz curricula provide compact and well-researched information for teachers, supplemented by student learning activities that reinforce the lecture portions of the topic. These activities are grade-appropriate and incorporate…

  17. The QWeCI Project: seamlessly linking climate science to society

    NASA Astrophysics Data System (ADS)

    Morse, A. P.; Caminade, C.; Jones, A. E.; MacLeod, D.; Heath, A. E.

    2012-04-01

    The EU FP7 QWeCI project Quantifying Weather and Climate Impacts on health in developing countries (www.liv.ac.uk/qweci) has 13 partners with 7 of these in Africa. The geographical focus of the project is in Senegal, Ghana and Malawi. In all three countries the project has a strong scientific dissemination outlook as well as having field based surveillance programmes in Ghana and Senegal to understand more about the local parameters controlling the transmission of malaria and in Senegal of Rift Valley fever. The project has a strong and active climate science activity in using hindcasts of the new System 4 seasonal forecasting system at ECMWF; to further develop the use of monthly to seasonal forecasts from ensemble prediction systems; within project downscaling development; the assessment of decadal ensemble prediction systems; and the development and testing of vector borne disease models for malaria and Rift Valley fever. In parallel with the science programme the project has a large outreach activity involving regular communication and bi-lateral exchanges, science and decision maker focused workshops. In Malawi a long range WiFi network has been established for the dissemination of data. In Senegal where they is a concentration of partners and stakeholders the project is gaining a role as a catalyst for wider health and climate related activity within government departments and national research bodies along with the support and involvement of local communities. Within these wider community discussions we have interactive inputs from African and European scientists who are partners in the project. This paper will show highlights of the work completed so far and give an outline to future development and to encourage a wider user interaction from outside of the current project team and their direct collaborators.

  18. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    PubMed

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural financing of clinical pharmacy.

  19. Country report of the Democratic Republic of the Sudan.

    PubMed

    Osman, A

    1982-01-01

    Reports on current activities in training of nonphysician personnel for maternal-child health/family health care delivery in Sudan. Lists are provided for the following: the 5 types of facilities operated by the Ministry of Health; other training and services projects; and The Sudan Family Planning Association activities. It is felt that all of these activities need strengthening in the training component. The following projects are being planned by the Khartoum College of Nursing: 1) a family planning project in conjunction with the nutrition clinic in the Children's Hospital; 2) a family planning project in the Gazera irrigated area where community development projects are in existence; 3) a movement into the rural areas of 6 regions of the country of the Sudan Women's Union Health Education Program for Women Leaders; 4) a project for providing free maternity service to needy mothers through maternity homes located within easy reach. These homes are intended to give service and at the same time act as training centers in maternal-child health/family health care for nonphysician personnel.

  20. A project optimization for small watercourses restoration in the northern part of the Volga-Akhtuba floodplain by the geoinformation and hydrodynamic modeling

    NASA Astrophysics Data System (ADS)

    Voronin, Alexander; Vasilchenko, Ann; Khoperskov, Alexander

    2018-03-01

    The project of small watercourses restoration in the northern part of the Volga-Akhtuba floodplain is considered together with the aim of increasing the watering of the territory during small and medium floods. The topography irregularity, the complex structure of the floodplain valley consisting of large number of small watercourses, the presence of urbanized and agricultural areas require careful preliminary analysis of the hydrological safety and efficiency of geographically distributed project activities. Using the digital terrain and watercourses structure models of the floodplain, the hydrodynamic flood model, the analysis of the hydrological safety and efficiency of several project implementation strategies has been conducted. The objective function values have been obtained from the hydrodynamic calculations of the floodplain territory flooding for virtual digital terrain models simulating alternatives for the geographically distributed project activities. The comparative efficiency of several empirical strategies for the geographically distributed project activities, as well as a two-stage exact solution method for the optimization problem has been studied.

  1. 7 CFR 1486.506 - When will a project be reviewed?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  2. Active solution of homography for pavement crack recovery with four laser lines.

    PubMed

    Xu, Guan; Chen, Fang; Wu, Guangwei; Li, Xiaotao

    2018-05-08

    An active solution method of the homography, which is derived from four laser lines, is proposed to recover the pavement cracks captured by the camera to the real-dimension cracks in the pavement plane. The measurement system, including a camera and four laser projectors, captures the projection laser points on the 2D reference in different positions. The projection laser points are reconstructed in the camera coordinate system. Then, the laser lines are initialized and optimized by the projection laser points. Moreover, the plane-indicated Plücker matrices of the optimized laser lines are employed to model the laser projection points of the laser lines on the pavement. The image-pavement homography is actively determined by the solutions of the perpendicular feet of the projection laser points. The pavement cracks are recovered by the active solution of homography in the experiments. The recovery accuracy of the active solution method is verified by the 2D dimension-known reference. The test case with the measurement distance of 700 mm and the relative angle of 8° achieves the smallest recovery error of 0.78 mm in the experimental investigations, which indicates the application potentials in the vision-based pavement inspection.

  3. Behavior‐dependent activity patterns of GABAergic long‐range projecting neurons in the rat hippocampus

    PubMed Central

    Micklem, Ben; Borhegyi, Zsolt; Swiejkowski, Daniel A.; Valenti, Ornella; Viney, Tim J.; Kotzadimitriou, Dimitrios; Klausberger, Thomas

    2017-01-01

    ABSTRACT Long‐range glutamatergic and GABAergic projections participate in temporal coordination of neuronal activity in distributed cortical areas. In the hippocampus, GABAergic neurons project to the medial septum and retrohippocampal areas. Many GABAergic projection cells express somatostatin (SOM+) and, together with locally terminating SOM+ bistratified and O‐LM cells, contribute to dendritic inhibition of pyramidal cells. We tested the hypothesis that diversity in SOM+ cells reflects temporal specialization during behavior using extracellular single cell recording and juxtacellular neurobiotin‐labeling in freely moving rats. We have demonstrated that rare GABAergic projection neurons discharge rhythmically and are remarkably diverse. During sharp wave‐ripples, most projection cells, including a novel SOM+ GABAergic back‐projecting cell, increased their activity similar to bistratified cells, but unlike O‐LM cells. During movement, most projection cells discharged along the descending slope of theta cycles, but some fired at the trough jointly with bistratified and O‐LM cells. The specialization of hippocampal SOM+ projection neurons complements the action of local interneurons in differentially phasing inputs from the CA3 area to CA1 pyramidal cell dendrites during sleep and wakefulness. Our observations suggest that GABAergic projection cells mediate the behavior‐ and network state‐dependent binding of neuronal assemblies amongst functionally‐related brain regions by transmitting local rhythmic entrainment of neurons in CA1 to neuronal populations in other areas. © 2016 The Authors Hippocampus Published by Wiley Periodicals, Inc. PMID:27997999

  4. Desert Peak East Enhanced Geothermal Systems (EGS) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zemach, Ezra; Drakos, Peter; Spielman, Paul

    2013-09-30

    This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.

  5. The role of geomorphology in environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Cavallin, A.; Marchetti, M.; Panizza, M.; Soldati, M.

    1994-04-01

    This paper aims to define the role of Geomorphology in the assessment of the impact of human activities on the environment. Environmental impact assessment (EIA) should be carried out for specific projects, in order to evaluate their suitability for the quality of the environment. In fact, each planned activity may have an impact on various environmental components. Among these, the natural component must be examined in terms of geomorphological hazards, which may endanger a project, and of geomorphological assets (elements forming the educational and cultural heritage of the landscape), which may be damaged to various extents by human activities. The relationships between humans and environment are taken into account, with particular attention to the effects of a project on the geomorphological environment. From a geomorphological point of view, after having assessed the suitability of a certain location, mainly with respect to its morphography and morphometry, the geomorphological hazards of the area which may threaten the project (risk) must be considered; then the geomorphological assets, which may be damaged by the same project (direct impact) have to be individuated. Human activities may produce two other kinds of effect: the first refers to the consequences of the geomorphological hazards induced by a project on the project itself (direct risk) and on the surronding areas (indirect risk); the second takes into account the potential deterioration of a geomorphological asset due to hazards induced by the project (indirect impact). Examples of these different cases are presented.

  6. Development of the Oxford Hills Healthy Moms Project using a social marketing process: a community-based physical activity and nutrition intervention for low-socioeconomic-status mothers in a rural area in Maine.

    PubMed

    Dharod, Jigna M; Drewette-Card, Rebecca; Crawford, David

    2011-03-01

    A physical activity and nutrition community intervention called the Oxford Hills Healthy Moms (OHHM) Project was developed using a multifaceted social marketing process, including review of state surveillance results, key informant interviews, and a survey and focus group discussions with low-socioeconomic-status (low-SES) mothers. This formative work was used to make key decisions on the selection of the intervention region, segmentation of the audience, and design of intervention strategies addressing multiple levels of the socioecological model. The OHHM Project aims to increase fruit and vegetable consumption and physical activity levels among low-SES mothers in the Oxford Hills region of Maine. The OHHM Project includes five components: (a) physical activity buddy program, (b) cooking club with education, (c) fruit and vegetable discount buying club with education, (d) increased access to produce vendors, and (e) increased access to places for physical activity.

  7. Spatial-temporal patterns of retinal waves underlying activity-dependent refinement of retinofugal projections.

    PubMed

    Stafford, Ben K; Sher, Alexander; Litke, Alan M; Feldheim, David A

    2009-10-29

    During development, retinal axons project coarsely within their visual targets before refining to form organized synaptic connections. Spontaneous retinal activity, in the form of acetylcholine-driven retinal waves, is proposed to be necessary for establishing these projection patterns. In particular, both axonal terminations of retinal ganglion cells (RGCs) and the size of receptive fields of target neurons are larger in mice that lack the beta2 subunit of the nicotinic acetylcholine receptor (beta2KO). Here, using a large-scale, high-density multielectrode array to record activity from hundreds of RGCs simultaneously, we present analysis of early postnatal retinal activity from both wild-type (WT) and beta2KO retinas. We find that beta2KO retinas have correlated patterns of activity, but many aspects of these patterns differ from those of WT retina. Quantitative analysis suggests that wave directionality, coupled with short-range correlated bursting patterns of RGCs, work together to refine retinofugal projections.

  8. Genomic standards consortium projects.

    PubMed

    Field, Dawn; Sterk, Peter; Kottmann, Renzo; De Smet, J Wim; Amaral-Zettler, Linda; Cochrane, Guy; Cole, James R; Davies, Neil; Dawyndt, Peter; Garrity, George M; Gilbert, Jack A; Glöckner, Frank Oliver; Hirschman, Lynette; Klenk, Hans-Peter; Knight, Rob; Kyrpides, Nikos; Meyer, Folker; Karsch-Mizrachi, Ilene; Morrison, Norman; Robbins, Robert; San Gil, Inigo; Sansone, Susanna; Schriml, Lynn; Tatusova, Tatiana; Ussery, Dave; Yilmaz, Pelin; White, Owen; Wooley, John; Caporaso, Gregory

    2014-06-15

    The Genomic Standards Consortium (GSC) is an open-membership community that was founded in 2005 to work towards the development, implementation and harmonization of standards in the field of genomics. Starting with the defined task of establishing a minimal set of descriptions the GSC has evolved into an active standards-setting body that currently has 18 ongoing projects, with additional projects regularly proposed from within and outside the GSC. Here we describe our recently enacted policy for proposing new activities that are intended to be taken on by the GSC, along with the template for proposing such new activities.

  9. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    NASA Astrophysics Data System (ADS)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  10. A Student Activity for the James Bay Hydro Project. The Geography Teacher.

    ERIC Educational Resources Information Center

    Green-Milberg, Patricia

    1999-01-01

    Provides activities for grades 6 to 8 that will promote student awareness and understanding of the use of hydropower in Canada, the benefits and drawbacks to hydropower, and also the drawbacks of electricity transmission lines. Explains that the activities focus on the James Bay Hydro Project in Canada. (CMK)

  11. Reuse, Repurposing and Learning Design--Lessons from the DART Project

    ERIC Educational Resources Information Center

    Bond, Stephen T.; Ingram, Caroline; Ryan, Steve

    2008-01-01

    Digital Anthropological Resources for Teaching (DART) is a major project examining ways in which the use of online learning activities and repositories can enhance the teaching of anthropology and, by extension, other disciplines. This paper reports on one strand of DART activity, the development of customisable learning activities that can be…

  12. Health Activities Project (HAP), Trial Edition III.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) trial edition (set III) are a teacher information folio and numerous student activity folios which center around the idea that students in grades 5-8 can control their own health and safety. Each student folio is organized into an Overview, Health Background, Materials, Setting Up, and…

  13. Health Activities Project (HAP), Trial Edition II.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) trial edition (set II) are a teacher information folio and numerous student activity folios which center around the idea that students in grades 5-8 can control their own health and safety. Each student folio is organized into a Synopsis, Health Background, Materials, Setting Up, and Activities…

  14. "Project Outreach," Final Report, December 31, 1979.

    ERIC Educational Resources Information Center

    Latzer, Robert M.

    Fall 1979 activities for Project Outreach, a faculty development program at Jersey City State College, are described. Problems involved in carrying out these activities, a statement of expenditures and balances, and a set of recommendations are covered. Four areas of activity planned at the college were: a second series of study skills seminars, a…

  15. Wildfire Research in an Environmental Hazards Course: An Active Learning Approach

    ERIC Educational Resources Information Center

    Wall, Tamara U.; Halvorson, Sarah J.

    2011-01-01

    Creating opportunities for students to actively apply hazards theory to real-life situations is often a challenge in hazards geography courses. This article presents a project, the Jocko Lakes Fire Project, that implemented learning strategies to encourage students to be active in wildfire hazards research. Wildfire hazards stand out as an…

  16. The Effects of Project-and Activity-Supported Practices on Mathematics Education Achievement and Student Views

    ERIC Educational Resources Information Center

    Tertemiz, Nese

    2012-01-01

    Problem Statement: Preservice teachers acquire the knowledge and skills needed for elementary mathematics education by themselves obtaining quality university educations and by being actively involved in mathematics. Thus, it is essential to make room in teacher education for student-centered projects and activities. Purpose of Study: This study…

  17. Army Corps of Engineers: Water Resource Authorizations, Appropriations, and Activities

    DTIC Science & Technology

    2016-02-09

    favorable benefit -cost ratio. 31 Local sponsors assume any rehabilitation cost for damage to an active project attributable to deficient maintenance...infrastructure activities are not traditional Corps water resources projects, they are not subject to the Corps planning process (e.g., a benefit -cost...Army Corps of Engineers: Water Resource Authorizations, Appropriations, and Activities Nicole T. Carter Specialist in Natural Resources Policy

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B; Dawn S. Kaback, D; Eugene L. LeBoeuf, E

    Beginning in 2006, the US Department of Energy (DOE) supported nine applied research projects to improve the protection of the Columbia River and mitigate the impacts of Hanford Site groundwater. These projects were funded through a supplemental Congressional budget allocation, and are now in various stages of completion in accordance with the research plans. The DOE Office of Environmental Management Groundwater and Soil Cleanup Technologies (EM-22) sponsored a technical peer review meeting for these projects in Richland WA, July 28-31, 2008. The overall objective of the peer review is to provide information to support DOE decisions about the status andmore » potential future application of the various technologies. The charge for the peer review panel was to develop recommendations for each of the nine 'technologies'. Team members for the July 2008 review were Brian Looney, Gene LeBoeuf, Dawn Kaback, Karen Skubal, Joe Rossabi, Paul Deutsch, and David Cocke. Previous project reviews were held in May 2007 and March-May of 2006. The team used the following four rating categories for projects: (a) Incorporate the technology/strategy in ongoing and future EM activities; (b) Finish existing scope of applied research and determine potential for EM activities when research program is finished; (c) Discontinue current development activities and do not incorporate technology/strategy into ongoing and future EM activities unless a significant and compelling change in potential viability is documented; and (d) Supplement original funded work to obtain the data needed to support a DOE decision to incorporate the technology into ongoing and future EM activities. The supplemental funding portfolio included two projects that addressed strontium, five projects that addressed chromium, one project that addressed uranium and one project that addressed carbon tetrachloride. The projects ranged from in situ treatment methods for immobilizing contaminants using chemical-based methods such as phosphate addition, to innovative surface treatment technologies such as electrocoagulation. Total funding for the nine projects was $9,900,000 in fiscal year (FY) 2006 and $2,000,000 in FY 2007. At the Richland meeting, the peer reviewers provided a generally neutral assessment of the projects and overall progress, and a generally positive assessment with regard to the principal investigators meeting their stated research objectives and performing the planned laboratory research and limited field work. Only one project, the Electrocoagulation Treatability Test, received a rating of 'discontinue' from the team because the project goals had not been met. Because this particular project has already ended, no action with respect to funding withdrawal is necessary. All other projects were recommended to be finished and/or incorporated into field efforts at Hanford. Specific technical comments and recommendations were provided by the team for each project.« less

  19. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  20. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  1. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  2. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  3. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  4. An improved affine projection algorithm for active noise cancellation

    NASA Astrophysics Data System (ADS)

    Zhang, Congyan; Wang, Mingjiang; Han, Yufei; Sun, Yunzhuo

    2017-08-01

    Affine projection algorithm is a signal reuse algorithm, and it has a good convergence rate compared to other traditional adaptive filtering algorithm. There are two factors that affect the performance of the algorithm, which are step factor and the projection length. In the paper, we propose a new variable step size affine projection algorithm (VSS-APA). It dynamically changes the step size according to certain rules, so that it can get smaller steady-state error and faster convergence speed. Simulation results can prove that its performance is superior to the traditional affine projection algorithm and in the active noise control (ANC) applications, the new algorithm can get very good results.

  5. Physics Curriculum Development Project. Aims, Organisation, Activities of PLON: A Physics Curriculum Development Project for General Secondary Education in the Netherlands. Outline.

    ERIC Educational Resources Information Center

    Utrecht State Univ., (Netherlands).

    This document highlights the aims and activities of a project designed to modernize and update physics teaching and physics curriculum in the Netherlands by developing materials for use with students aged 12-18 at intermediate general, higher general, and pre-university schools. Following general information (including a brief description of the…

  6. Exploring Marine Ecosystems with Elementary School Portuguese Children: Inquiry-Based Project Activities Focused on "Real-Life" Contexts

    ERIC Educational Resources Information Center

    Guilherme, Elsa; Faria, Cláudia; Boaventura, Diana

    2016-01-01

    The purpose of the study was to investigate how young students engage in an inquiry-based project driven by real-life contexts. Elementary school children were engaged in a small inquiry project centred on marine biodiversity and species adaptations. All activities included the exploration of an out-of-school setting as a learning context. A total…

  7. Dewey Decimal Classification Online Project: Interim Reports to the Council on Library Resources, April 1984, September 1984, and February 1985.

    ERIC Educational Resources Information Center

    Markey, Karen; Demeyer, Anh N.

    This research project focuses on the implementation and testing of the Dewey Decimal Classification (DDC) system as an online searcher's tool for subject access, browsing, and display in an online catalog. The research project comprises 12 activities. The three interim reports in this document cover the first seven of these activities: (1) obtain…

  8. Pedagogical Content Knowledge in Special Needs Education: A Case Study of an Art Project with the Multiple/Severe Handicapped

    ERIC Educational Resources Information Center

    Murayama, Taku

    2016-01-01

    This paper focuses on a project in teacher education through art activities at the undergraduate level. The main theme is art activities by university students and multiple and severe handicapped students. This project has two significant points for the preparation of special education teachers. One point is the opportunity for field work. Even…

  9. Wind Powering America's Wind for Schools Project: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.; Newcomb, C.

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  10. ENVRI PLUS project: Developing an ethical framework for Environmental and Earth System Research Infrastructures

    NASA Astrophysics Data System (ADS)

    Peppoloni, Silvia; Di Capua, Giuseppe; Haslinger, Florian

    2016-04-01

    ENVRI PLUS is a Horizon 2020 project bringing together Environmental and Earth System Research Infrastructures (RIs), projects and networks with technical specialist partners to create a more coherent, interdisciplinary and interoperable cluster of Environmental Research Infrastructures across Europe (http://www.envriplus.eu/). One theme of the project deals with the societal relevance and understanding, and within that theme an entire work-package (WP) aims at developing an ethical framework for RIs. Objectives of this WP are: • increase the awareness of both the scientists and the public on the importance of ethical aspects in Earth sciences; • establish a shared ethical framework of reference, to be adopted by RIs governing bodies; • increase the awareness of RIs management and operational levels and of the individual involved scientists on their social role in conducting research activities and research work environment; • assess the ethical and social aspects related to the results achieved and deliverables released within the project. The ongoing activities include: • reviewing the state of art on ethical issues useful for the goals of the project (collection and analysis of materials already existing within scientific organizations, institutions all over the world); • the creation of a questionnaire, through which to investigate how each RI participating in ENVRI PLUS faces ethical issues in relation to its activities, and so to understand the level of perception that researchers and technicians involved in the project have on the ethical implications of their scientific activities; • the definition of ethics guidelines to be used by partners for building their policies and their own codes of conduct; • the elaboration of an ethical label template to characterize each product of the project, that partners will be able to use in order to give essential information about the ethical and social implications of their products; • the dissemination of all the results of the previous activities on websites and social networks, so that they are suitable for the public. ENVRI PLUS is the first European project in which ethics applied to geosciences find space as a fundamental issue, at the base of scientific activities.

  11. The Federal Grant and Cooperative Agreement Act of 1977

    EPA Pesticide Factsheets

    The FGCAA establishes government-wide criteria for determining the appropriate legal instrument for funding an extramural activity.If EPA,usually the Project Officer,participates in project activities,then a cooperative agreement is the proper funding tool

  12. The new I-64 economic and regional mobility study.

    DOT National Transportation Integrated Search

    2011-11-01

    The Final Report summarizes the 2008 and 2009 Annual Reports of all studys activities conducted during the I-64 Full-closure construction project in the St. Louis, Missouri region. These activities included project communications, public opinions,...

  13. Evaluation of traffic control devices : fifth-year activities.

    DOT National Transportation Integrated Search

    2009-02-01

    This project was established to provide a means of conducting limited scope evaluations of numerous traffic : control device issues. During the fifth, and final, year of the project, researchers conducted four activities: : improving the interface fo...

  14. NASA Desert RATS 2011 Education Pilot Project and Classroom Activities

    NASA Technical Reports Server (NTRS)

    Gruener, J. E.; McGlone, M.; Allen, J.; Tobola, K.; Graff, P.

    2012-01-01

    The National Aeronautics and Space Administration's (NASA's) Desert Research and Technology Studies (Desert RATS) is a multi-year series of tests of hardware and operations carried out annually in the high desert of Arizona, as an analog to future exploration activities beyond low Earth orbit [1]. For the past several years, these tests have occurred in the San Francisco Volcanic Field, north of Flagstaff. For the 2011 Desert RATS season, the Exploration Systems Mission Directorate (ESMD) at NASA headquarters provided support to develop an education pilot project that would include student activities to parallel the Desert RATS mission planning and exploration activities in the classroom, and educator training sessions. The development of the pilot project was a joint effort between the NASA Johnson Space Center (JSC) Astromaterials Research and Exploration Science (ARES) Directorate and the Aerospace Education Services Project (AESP), managed at Penn State University.

  15. Updated Projected Prevalence of Self-Reported Doctor-Diagnosed Arthritis and Arthritis-Attributable Activity Limitation Among US Adults, 2015-2040.

    PubMed

    Hootman, Jennifer M; Helmick, Charles G; Barbour, Kamil E; Theis, Kristina A; Boring, Michael A

    2016-07-01

    To update the projected prevalence of arthritis and arthritis-attributable activity limitations among US adults, using a newer baseline for estimates. Baseline prevalence data were obtained from the 2010-2012 National Health Interview Survey. Arthritis was defined as an answer of "yes" to the question "Have you ever been told by a doctor or other health professional that you have some form of arthritis, rheumatoid arthritis, gout, lupus or fibromyalgia?" Arthritis-attributable activity limitation was defined as an answer of "yes" to the question "Are you limited in any way in any of your usual activities because of arthritis or joint symptoms?" The baseline prevalence of arthritis and arthritis-attributable activity limitation was stratified according to age and sex and was statistically weighted to account for the complex survey design. The projected prevalence of doctor-diagnosed arthritis and arthritis-attributable activity limitation was calculated by multiplying the age- and sex-stratified population estimates projected for 2015-2040 (in 5-year intervals; provided by the US Census Bureau) by the baseline estimates. Age- and sex-specific prevalences were summed to provide the total prevalence estimates for each year. In 2010-2012, 52.5 million adults in the US (22.7% of all adults) had doctor-diagnosed arthritis, and 22.7 million (9.8%) had arthritis-attributable activity limitation. By 2040, the number of US adults with doctor-diagnosed arthritis is projected to increase 49% to 78.4 million (25.9% of all adults), and the number of adults with arthritis-attributable activity limitation will increase 52% to 34.6 million (11.4% of all adults). Updated projections suggest that arthritis and arthritis-attributable activity limitation will remain large and growing problems for clinical and public health systems, which must plan and create policies and resources to address these future needs. © 2016, American College of Rheumatology.

  16. Resource Constrained Planning of Multiple Projects with Separable Activities

    NASA Astrophysics Data System (ADS)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  17. Experience of the creative Space-Astrophysics Education in Israeli Science-Educational Center "Blossoms of Science" - creative activity from mini-projects in basic school to ASTROTOP-projects for graduates

    NASA Astrophysics Data System (ADS)

    Pustil'Nik, L.; Pundak, D.

    We present 12 year experience of educational project in Space Astrophysics Environment field realized on the base of National Science-Educational Center Blossoms of Science of the Jordan Valley College Our approach is based on the natural curiosity of children as driver of their self-development from the first minutes of their life and even in adult state This approach shift center of the weight in educational process from direct lectures sermons explanation from teacher to children on own attempts of children to investigate problem what is interesting for them by themselves individually or in group Our approach includes four levels of the projects nano-projects for children garden and basic school up to 10-12 years micro-projects for intermediate school 12-16 years mini-projects for high school 16-18 years and macro-projects for the best graduates high schools and students of colleges 17-22 years These levels and projects are interconnected one with another and sometimes participants started on the micro-projects level in intermediate school continue their activity up to macro-projects of the graduate s diploma level For each level we organize courses for preparation of the teachers and instructors interested in the using of our receipts and published books and brochures for them The content of our activity for different levels a Level of kinder gardens-basic schools -- special software with interactive movie - - nano-projects b Level of intermediate school Days of Science in tens schools of Israel--

  18. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  19. Early Owner Planning Leads to Project Success

    ERIC Educational Resources Information Center

    Gainsboro, Dan

    2006-01-01

    In the vast majority of building projects, decisions made in the first 10 percent of project activity directly determine 90 percent of the final cost and schedule. When a project is poorly planned, project costs can expand beyond estimates by as much as 50 percent. Since the owner's rate of spending increases as a building project proceeds,…

  20. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  1. Navamaga: a new path to new lives.

    PubMed

    Eddy, D; Garb, G

    1985-11-01

    A project in Sri Lanka sponsored by USAID AND the Overseas Education Fund (OEF) used nonformal training to prepare development workers to help women's groups orgnize income-generating projects. OEF and the Women's Bureau developed a 2-phase program for a toatl of 2 months training, which was separated by a 5-month period of field work. By the time the project came to an end in June 1982, development officers had helped rural women set up 2000 income-generating activities in Sri Lanka. their net profit was US $32,000 per month or an average of US $16 per woman. The profits from their activities surpassed the cost of the training project in less than a year. In the following year another 2000 activities were successfully started, so that beneficiaries, as of June, 1983 totalled over 22,000 people--4000 rural wmen and their families. The project, therefore, had a positive impact in a variety of areas: increased agricultural population, increased employment, increased participation of women in economic activities, development of institutional capability in rural areas, raised income of the rural poor and enhancement of health and nutrition.

  2. WFIRST Project Science Activities

    NASA Technical Reports Server (NTRS)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  3. 34 CFR 645.40 - What are allowable costs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... related to the objectives of the project: (a) In-service training of project staff. (b) Rental of space if... project-sponsored banquet or ceremony. (i) Tuition costs for postsecondary credit courses at the host... to a project participant while participating in a project activity; and (2) Medical insurance and...

  4. 34 CFR 645.40 - What are allowable costs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... related to the objectives of the project: (a) In-service training of project staff. (b) Rental of space if... project-sponsored banquet or ceremony. (i) Tuition costs for postsecondary credit courses at the host... to a project participant while participating in a project activity; and (2) Medical insurance and...

  5. 34 CFR 645.40 - What are allowable costs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... related to the objectives of the project: (a) In-service training of project staff. (b) Rental of space if... project-sponsored banquet or ceremony. (i) Tuition costs for postsecondary credit courses at the host... to a project participant while participating in a project activity; and (2) Medical insurance and...

  6. 34 CFR 645.40 - What are allowable costs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... related to the objectives of the project: (a) In-service training of project staff. (b) Rental of space if... project-sponsored banquet or ceremony. (i) Tuition costs for postsecondary credit courses at the host... to a project participant while participating in a project activity; and (2) Medical insurance and...

  7. Stakeholder integration and public engagement of EU and national research projects in Germany

    NASA Astrophysics Data System (ADS)

    Ruhnau, Meike; Guo, Chenbo; Walter, Anastasia; Schneider, Nadine

    2017-04-01

    The talk addresses the feasibility and difficulties of research projects to reach out and to integrate a sufficient number of stakeholders (vgl. Carrada, 2006; Poulsen, 2007; Zikos et al. 2012; Lee & Belohlav, 2014). With "stakeholders" we understand end-users, policy makers, students for capacity building, administrators and interested general public. The design and later the implementation of stakeholder integration and public engagement strongly depend on the priority-setting and requirements of funding agencies (EU [1], DFG, BMBF and the regional ministries in Germany). They affect the size and constellation of consortia as well as the longevity and continuity of research community; on the other hand they also determine the weighting of communication, dissemination, outreach (and networking) activities within the project. For instance by public engagement of EU funded projects a share of 10% for communication and outreach activities was rated as best practices in 2014 [2]. On the national level there is no such appointment so far. In our talk we will quantify and compare activities among selected EU and nationally funded collaborative projects in Germany, address the hurdles, investigate the communication tools, examine the outreach channels and dissemination tactics, reflect the performances and the results achieved so far, with the objective to answer the following questions: - What tools/channels have been applied so far? Were they efficient and expedient? - What can be count as best practices? - Are such activities sustainable at all? The goal of this talk is to show the complexity of the stakeholder integration and public engagement in research projects, to critically assess our experiences gained in past and running projects, and to subsequently have an interactive exchange with other project professionals at EGU. [1] European Commission (2004, 2008, 2010, 2014). Communicating EU research and innovation guidance for project participants; [2] European Commission (2014) - Project COMET (best practice); European Commission (2016) - Project EUPORIAS (success story)

  8. 75 FR 64243 - Umatilla National Forest, Walla Walla Ranger District; Oregon Tollgate Fuels Reduction Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... trees; however, larger trees may be removed as necessary to meet project objectives. Activities within... through the removal of standing (live and dead) trees and dead and down material. These activities would...

  9. Future projections of active-break spells of Indian summer monsoon in a climate change perspective

    NASA Astrophysics Data System (ADS)

    Sudeepkumar, B. L.; Babu, C. A.; Varikoden, Hamza

    2018-02-01

    The effect of global climate change on Indian summer monsoon has been analysed with special emphasis on active-break cycle. The changes in intensity and duration of active and break monsoon conditions towards the end of the century are studied by using 850 hPa zonal circulations. The analysis is carried out using twenty year climatology of historical period (1986-2005) and future projections (2080-2099) simulated as part of Coupled Model Intercomparison Project phase 5 (CMIP5). Models are compared with NCEP/NCAR reanalysis data. The models that effectively capture the circulation pattern of monsoon (JJAS) are considered for assessing the future climate in RCP 4.5 scenario. They are CanESM2, CNRM-CM5, GFDL-ESM2M, MIROC5 and MPI-ESM-LR. During the southwest monsoon period, the ensemble mean of models projects a strengthening of the wind speed towards north (north of 15°N) and weakening to the southern region (especially south of 12°N) which facilitates wetting of northern Indian regions and drying of southern peninsular regions. In the case of active-break conditions, the active spells are found to be strengthening over northern India and weakening over the peninsular India, the break spells intensify over southern tip of peninsular India indicating intense breaks. Increased propensity of short intense active days and decreased propensity of long active days are also projected by the models. The number of break spells does not show any significant changes.

  10. The diversity and evolution of ecological and environmental citizen science.

    PubMed

    Pocock, Michael J O; Tweddle, John C; Savage, Joanna; Robinson, Lucy D; Roy, Helen E

    2017-01-01

    Citizen science-the involvement of volunteers in data collection, analysis and interpretation-simultaneously supports research and public engagement with science, and its profile is rapidly rising. Citizen science represents a diverse range of approaches, but until now this diversity has not been quantitatively explored. We conducted a systematic internet search and discovered 509 environmental and ecological citizen science projects. We scored each project for 32 attributes based on publicly obtainable information and used multiple factor analysis to summarise this variation to assess citizen science approaches. We found that projects varied according to their methodological approach from 'mass participation' (e.g. easy participation by anyone anywhere) to 'systematic monitoring' (e.g. trained volunteers repeatedly sampling at specific locations). They also varied in complexity from approaches that are 'simple' to those that are 'elaborate' (e.g. provide lots of support to gather rich, detailed datasets). There was a separate cluster of entirely computer-based projects but, in general, we found that the range of citizen science projects in ecology and the environment showed continuous variation and cannot be neatly categorised into distinct types of activity. While the diversity of projects begun in each time period (pre 1990, 1990-99, 2000-09 and 2010-13) has not increased, we found that projects tended to have become increasingly different from each other as time progressed (possibly due to changing opportunities, including technological innovation). Most projects were still active so consequently we found that the overall diversity of active projects (available for participation) increased as time progressed. Overall, understanding the landscape of citizen science in ecology and the environment (and its change over time) is valuable because it informs the comparative evaluation of the 'success' of different citizen science approaches. Comparative evaluation provides an evidence-base to inform the future development of citizen science activities.

  11. Focused Campaign Increases Activity among Participants in "Nature's Notebook," a Citizen Science Project

    ERIC Educational Resources Information Center

    Crimmins, Theresa M.; Weltzin, Jake F.; Rosemartin, Alyssa H.; Surina, Echo M.; Marsh, Lee; Denny, Ellen G.

    2014-01-01

    Science projects, which engage non-professional scientists in one or more stages of scientific research, have been gaining popularity; yet maintaining participants' activity level over time remains a challenge. The objective of this study was to evaluate the potential for a short-term, focused campaign to increase participant activity in a…

  12. Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences From The Space Technology 5 Project

    NASA Technical Reports Server (NTRS)

    Sauerwein, Timothy A.; Gostomski, Thomas

    2007-01-01

    This brief presentation describes the mechanical and electrical integration activities and environmental testing challenges of the Space Technology 5 (ST5) Project. Lessons learned during this process are highlighted, including performing mechanical activities serially to gain efficiency through repetition and performing electrical activities based on the level of subsystem expertise available.

  13. SOIL AND WATER CONSERVATION PROJECTS AND ACTIVITIES, A GUIDE FOR 4-H CLUB LEADERS.

    ERIC Educational Resources Information Center

    FOSTER, ALBERT B.; FOX, ADRIAN C.

    THIS PUBLICATION WAS PREPARED BY THE SOIL CONSERVATION SERVICE FOR USE WITH YOUTH GROUPS. VARIOUS ACTIVITIES AND PROJECTS ARE PRESENTED WHICH CAN BE USED TO DEVELOP CONCEPTS ABOUT SOIL AND WATER CONSERVATION. IN ORDER TO SIMPLIFY THE PROCESS OF DEMONSTRATING THESE ACTIVITIES, MANY OF THE CONCEPTS ARE PICTORIALLY ILLUSTRATED. THE ACTIVITIES…

  14. Activities Selected from the High School Geography Project.

    ERIC Educational Resources Information Center

    Natoli, Salvatore J., Ed.; And Others

    Out of approximately 50 activities which were, for a variety of reasons, not included in the final version of the High School Geography Project course, Geography in an Urban Age, the HSGP staff selected eight which would be useful in many secondary school classrooms. The activities included here are: 1) Operation Bigger Beef (on themes of cultural…

  15. Newspaper Content Analysis in Evaluation of a Community-Based Participatory Project to Increase Physical Activity

    ERIC Educational Resources Information Center

    Granner, Michelle L.; Sharpe, Patricia A.; Burroughs, Ericka L.; Fields, Regina; Hallenbeck, Joyce

    2010-01-01

    This study conducted a newspaper content analysis as part of an evaluation of a community-based participatory research project focused on increasing physical activity through policy and environmental changes, which included activities related to media advocacy and media-based community education. Daily papers (May 2003 to December 2005) from both…

  16. 12 Years of Action Learning at EM Normandie: Monitored Field Projects as Regular Pedagogical Activities

    ERIC Educational Resources Information Center

    Anger, Sophie Gay; Hachard, Virginie

    2011-01-01

    The Master Grande Ecole curriculum at EM Normandie School is organized around junior consulting projects and real problem solving activities aiming at bridging the gap between classroom knowledge and professional competencies. Since the 90's, students are involved in regular consulting activities for local and national companies following the…

  17. Click! 101 Computer Activities and Art Projects for Kids and Grown-Ups.

    ERIC Educational Resources Information Center

    Bundesen, Lynne; And Others

    This book presents 101 computer activities and projects geared toward children and adults. The activities for both personal computers (PCs) and Macintosh were developed on the Windows 95 computer operating system, but they are adaptable to non-Windows personal computers as well. The book is divided into two parts. The first part provides an…

  18. The process evaluation of It's Your Move!, an Australian adolescent community-based obesity prevention project.

    PubMed

    Mathews, Louise B; Moodie, Marj M; Simmons, Annie M; Swinburn, Boyd A

    2010-07-30

    Evidence on interventions for preventing unhealthy weight gain in adolescents is urgently needed. The aim of this paper is to describe the process evaluation for a three-year (2005-2008) project conducted in five secondary schools in the East Geelong/Bellarine region of Victoria, Australia. The project, 'It's Your Move!' aimed to reduce unhealthy weight gain by promoting healthy eating patterns, regular physical activity, healthy body weight, and body size perception amongst youth; and improve the capacity of families, schools, and community organisations to sustain the promotion of healthy eating and physical activity in the region. The project was supported by Deakin University (training and evaluation), a Reference Committee (strategic direction, budgetary approval and monitoring) and a Project Management Committee (project delivery). A workshop of students, teachers and other stakeholders formulated a 10-point action plan, which was then translated into strategies and initiatives specific to each school by the School Project Officers (staff members released from teaching duties one day per week) and trained Student Ambassadors. Baseline surveys informed intervention development. Process data were collected on all intervention activities and these were collated and enumerated, where possible, into a set of mutually exclusive tables to demonstrate the types of strategies and the dose, frequency and reach of intervention activities. The action plan included three guiding objectives, four on nutrition, two on physical activity and one on body image. The process evaluation data showed that a mix of intervention strategies were implemented, including social marketing, one-off events, lunch time and curriculum programs, improvements in infrastructure, and healthy school food policies. The majority of the interventions were implemented in schools and focused on capacity building and healthy eating strategies as physical activity practices were seen by the teachers as already meeting students' needs. While substantial health-promoting activities were conducted (especially related to healthy eating), there remain further opportunities for secondary schools to use a whole-of-school approach through the school curriculum, environment, policies and ethos to improve healthy eating, physical activity and healthy body perceptions in youth. To achieve this, significant, sustained leadership will be required within the education sector generally and within schools specifically.

  19. Dog Helper's Guide: Dog Project Group Activities Grades 3-12. 4-H Skills for Life Animal Series. National 4-H Curriculum. BU-08169

    ERIC Educational Resources Information Center

    National 4-H Council, 2005

    2005-01-01

    This final guide in the series is designed to assist in one's role of helper for youth interested in the dog project. These learn-by-doing activities can be adapted for families, classrooms, dog project meetings, after school programs, camps or other settings. In this Helper's Guide, one will find helpful information about characteristics of…

  20. The Institute for Sustained Performance, Energy, and Resilience, University of North Carolina, Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, Robert

    This is the final report for the UNC component of the SciDAD Institute for Sustained Performance, Energy, and Resilience. In this report, we describe activities on the SUPER project at RENCI at the University of North Carolina at Chapel Hill. While we focus particularly on UNC, we touch on project-wide activities as well as, on interactions with, and impacts on, other projects.

  1. L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-30

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

  2. Hanford business structure for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 maymore » carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.« less

  3. Multi-objective optimization of discrete time-cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

    NASA Astrophysics Data System (ADS)

    Shahriari, Mohammadreza

    2016-06-01

    The time-cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate extra resources to short the finishing time of project and the project managers are intended to spend the lowest possible amount of money and achieve the maximum crashing time, as a result, both direct and indirect costs will be influenced in the project, and here, we are facing into the time value of money. It means that when we crash the starting activities in a project, the extra investment will be tied in until the end date of the project; however, when we crash the final activities, the extra investment will be tied in for a much shorter period. This study is presenting a two-objective mathematical model for balancing compressing the project time with activities delay to prepare a suitable tool for decision makers caught in available facilities and due to the time of projects. Also drawing the scheduling problem to real world conditions by considering nonlinear objective function and the time value of money are considered. The presented problem was solved using NSGA-II, and the effect of time compressing reports on the non-dominant set.

  4. Behavior-dependent activity patterns of GABAergic long-range projecting neurons in the rat hippocampus.

    PubMed

    Katona, Linda; Micklem, Ben; Borhegyi, Zsolt; Swiejkowski, Daniel A; Valenti, Ornella; Viney, Tim J; Kotzadimitriou, Dimitrios; Klausberger, Thomas; Somogyi, Peter

    2017-04-01

    Long-range glutamatergic and GABAergic projections participate in temporal coordination of neuronal activity in distributed cortical areas. In the hippocampus, GABAergic neurons project to the medial septum and retrohippocampal areas. Many GABAergic projection cells express somatostatin (SOM+) and, together with locally terminating SOM+ bistratified and O-LM cells, contribute to dendritic inhibition of pyramidal cells. We tested the hypothesis that diversity in SOM+ cells reflects temporal specialization during behavior using extracellular single cell recording and juxtacellular neurobiotin-labeling in freely moving rats. We have demonstrated that rare GABAergic projection neurons discharge rhythmically and are remarkably diverse. During sharp wave-ripples, most projection cells, including a novel SOM+ GABAergic back-projecting cell, increased their activity similar to bistratified cells, but unlike O-LM cells. During movement, most projection cells discharged along the descending slope of theta cycles, but some fired at the trough jointly with bistratified and O-LM cells. The specialization of hippocampal SOM+ projection neurons complements the action of local interneurons in differentially phasing inputs from the CA3 area to CA1 pyramidal cell dendrites during sleep and wakefulness. Our observations suggest that GABAergic projection cells mediate the behavior- and network state-dependent binding of neuronal assemblies amongst functionally-related brain regions by transmitting local rhythmic entrainment of neurons in CA1 to neuronal populations in other areas. © 2016 The Authors Hippocampus Published by Wiley Periodicals, Inc. © 2016 The Authors Hippocampus Published by Wiley Periodicals, Inc.

  5. Entrepreneurship skills development through project-based activity in Bachelor of Pharmacy program.

    PubMed

    Shahiwala, Aliasgar

    2017-07-01

    To provide pharmacy students with an opportunity to develop entrepreneurial thinking and skills. A business proposal building project-based activity was integrated into a two-credit hour pharmacy management course during the eighth semester of the bachelor of pharmacy degree program. The student groups submitted their proposals, mimicking the process of submitting business proposals and obtaining approval in the real world. Essential management tasks including operation procedures, location and layout design, inventory management, personnel management, marketing management, and finance management were taught step-by-step so that students could work on a similar scenario with their proposal building. Students' career preferences were also measured at the beginning and end of the course. Course was assessed by written exffigam and rubric based project evaluation. Student feedbacks of the project were collected using a five-point Likert scale. The project-based activity was well integrated in the course. The project helped the students (n=72) to understand management concepts more clearly, which was reflected by their significantly higher (p<0.01) grades compared to previous year. Students' feedback was overwhelmingly positive (mean score of 4.53 on the scale of 5). Students developed both interest and confidence to start a pharmacy as a result of this activity. The project was successfully designed and executed in a pharmacy management course within a bachelor of pharmacy curriculum. Based on the response received in this project, efforts will be made to provide guidance and support to the students by calling field experts such as pharmacy owners and financiers. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Aircraft engine hot section technology: An overview of the HOST Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Hirschberg, Marvin H.

    1990-01-01

    NASA sponsored the Turbine Engine Hot Section (HOST) project to address the need for improved durability in advanced aircraft engine combustors and turbines. Analytical and experimental activities aimed at more accurate prediction of the aerothermal environment, the thermomechanical loads, the material behavior and structural responses to loads, and life predictions for cyclic high temperature operation were conducted from 1980 to 1987. The project involved representatives from six engineering disciplines who are spread across three work disciplines - industry, academia, and NASA. The HOST project not only initiated and sponsored 70 major activities, but also was the keystone in joining the multiple disciplines and work sectors to focus on critical research needs. A broad overview of the project is given along with initial indications of the project's impact.

  7. The Yumekobo Project Education at Kanazawa Institute of Technology

    NASA Astrophysics Data System (ADS)

    Demura, Kosei; Tani, Masashi; Hattori, Yoichi

    Yumekobo, which can be translated as “Factory for Dreams and Ideas” , has been attracting the attention of reform-minded educators in Japanese universities. The major function of Yumekobo is to support a student project called the Yumekobo project. It resembles an extra-curricular club activity as at other universities; however, the Yumekobo project is not only an extra-curricular activity but also a symbol of the educational philosophy of Kanazawa Institute of Technology. Students in the Yumekobo project are encouraged to develop a good character, which includes independence, creativity, morality, cooperation, and internationalism. In this paper, an overview of the Yumekobo project is given, and its characteristics are described. Further, its educational effects are discussed based on an analysis of student questionnaires conducted from 2002 to 2005.

  8. Brownfields Allen-Morrison Project: Technical Memorandum on Creating Inventory of Materials that can be Reused or Recycled through Deconstruction

    EPA Pesticide Factsheets

    This technical memorandum presents sustainability pilot activities, a summary of inventory results, and other observations and recommendations for sustainable redevelopment identified during the pilot activities at the brownfields projects.

  9. Managed lanes handbook training : year 2 report of activities.

    DOT National Transportation Integrated Search

    2009-02-01

    This report summarizes the Year 2 activities under Implementation Project 5-4160-01, Managed Lanes : Handbook Training. The overall objective of the project is to develop a 12-hour workshop covering The : Managed Lanes Handbook, and teach the materia...

  10. [Activities of Center for Lidar and Atmospheric Sciences Students, Hampton University

    NASA Technical Reports Server (NTRS)

    Temple, Doyle

    2004-01-01

    The mission of CLASS was to provide education and training in NASA-related mathematics, technology and science to US. students who are underrepresented. In these areas and to encourage them to pursue advanced degrees. The project has three goals which support this mission: research training, curriculum development and outreach. All project activities are designed to meet a concrete objective which directly advances one of these goals. The common theme of all project activities is NASA's Earth Science Enterprise, in particular, the use of laser-based remote sensing systems (lidars) to monitor and understand the earth's environment

  11. Active Learning in the Physics Classroom

    NASA Astrophysics Data System (ADS)

    Naron, Carol

    Many students enter physics classes filled with misconceptions about physics concepts. Students tend to retain these misconceptions into their adult lives, even after physics instruction. Constructivist researchers have found that students gain understanding through their experiences. Researchers have also found that active learning practices increase conceptual understanding of introductory physics students. This project study sought to examine whether incorporating active learning practices in an advanced placement physics classroom increased conceptual understanding as measured by the force concept inventory (FCI). Physics students at the study site were given the FCI as both a pre- and posttest. Test data were analyzed using two different methods---a repeated-measures t test and the Hake gain method. The results of this research project showed that test score gains were statistically significant, as measured by the t test. The Hake gain results indicated a low (22.5%) gain for the class. The resulting project was a curriculum plan for teaching the mechanics portion of Advanced Placement (AP) physics B as well as several active learning classroom practices supported by the research. This project will allow AP physics teachers an opportunity to improve their curricular practices. Locally, the results of this project study showed that research participants gained understanding of physics concepts. Social change may occur as teachers implement active learning strategies, thus creating improved student understanding of physics concepts.

  12. Elementary and middle school science improvement project

    NASA Technical Reports Server (NTRS)

    Mcguire, Saundra Y.

    1989-01-01

    The Alabama A and M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted to improve the science knowledge of elementary and middle school teachers using the experimental or hands-on approach. Summer workshops were conducted during the summers of 1986, 1987, and 1988 in the areas of biology, chemistry, physics, and electricity, and magnetism. Additionally, a manual containing 43 lessons which included background information, experiments and activities for classroom and home use was provided to each teacher. During the course of the project activities, the teachers interacted with various university faculty members, scientists, and NASA staff. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcome are addressed.

  13. Coherent Lidar Activities at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Kavaya, Michael J.; Amzajerdian, Farzin; Koch, Grady J.; Singh, Upendra N.; Yu, Jirong

    2007-01-01

    NASA Langley Research Center has been developing and using coherent lidar systems for many years. The current projects at LaRC are the Global Wind Observing Sounder (GWOS) mission preparation, the Laser Risk Reduction Program (LRRP), the Instrument Incubator Program (IIP) compact, rugged Doppler wind lidar project, the Autonomous precision Landing and Hazard detection and Avoidance Technology (ALHAT) project for lunar landing, and the Skywalker project to find and use thermals to extend UAV flight time. These five projects encompass coherent lidar technology development; characterization, validation, and calibration facilities; compact, rugged packaging; computer simulation; trade studies; data acquisition, processing, and display development; system demonstration; and space mission design. This paper will further discuss these activities at LaRC.

  14. Bioinformatics projects supporting life-sciences learning in high schools.

    PubMed

    Marques, Isabel; Almeida, Paulo; Alves, Renato; Dias, Maria João; Godinho, Ana; Pereira-Leal, José B

    2014-01-01

    The interdisciplinary nature of bioinformatics makes it an ideal framework to develop activities enabling enquiry-based learning. We describe here the development and implementation of a pilot project to use bioinformatics-based research activities in high schools, called "Bioinformatics@school." It includes web-based research projects that students can pursue alone or under teacher supervision and a teacher training program. The project is organized so as to enable discussion of key results between students and teachers. After successful trials in two high schools, as measured by questionnaires, interviews, and assessment of knowledge acquisition, the project is expanding by the action of the teachers involved, who are helping us develop more content and are recruiting more teachers and schools.

  15. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  16. Activities for Teaching the Gifted Across the Curriculum. 1985 Summer Institute.

    ERIC Educational Resources Information Center

    1985

    The document presents a collection of projects developed by teachers enrolled in a 3-week summer institute on teaching various curriculum areas to gifted students. Outlines of 11 projects begin with brief descriptive information on project title, developer(s), grade level, curriculum area, and project duration. The following projects are…

  17. Towards a Comprehensive Conceptual Framework of Active Travel Behavior: a Review and Synthesis of Published Frameworks.

    PubMed

    Götschi, Thomas; de Nazelle, Audrey; Brand, Christian; Gerike, Regine

    2017-09-01

    This paper reviews the use of conceptual frameworks in research on active travel, such as walking and cycling. Generic framework features and a wide range of contents are identified and synthesized into a comprehensive framework of active travel behavior, as part of the Physical Activity through Sustainable Transport Approaches project (PASTA). PASTA is a European multinational, interdisciplinary research project on active travel and health. Along with an exponential growth in active travel research, a growing number of conceptual frameworks has been published since the early 2000s. Earlier frameworks are simpler and emphasize the distinction of environmental vs. individual factors, while more recently several studies have integrated travel behavior theories more thoroughly. Based on the reviewed frameworks and various behavioral theories, we propose the comprehensive PASTA conceptual framework of active travel behavior. We discuss how it can guide future research, such as data collection, data analysis, and modeling of active travel behavior, and present some examples from the PASTA project.

  18. NASA Project Planning and Control Handbook

    NASA Technical Reports Server (NTRS)

    Moreland, Robert; Claunch, Cathy L.

    2016-01-01

    This handbook provides an overview of the fundamental principles and explains the functions and products that go into project planning and control. The 2010 Interim Results of the NASA Program Planning and Control (PPC) Study identified seven categories of activities for PPC, and those provide the basis for the seven functions described in this handbook. This handbook maps out the interfaces and interactions between PPC functions, as well as their external interfaces. This integration of information and products within and between functions is necessary to form the whole picture of how a project is progressing. The handbook descriptions are meant to facilitate consistent, common, and comprehensive approaches for providing valued analysis, assessment, and evaluation focused on the project level at NASA. The handbook also describes activities in terms of function rather than the job title or the specific person or organization responsible for the activity, which could differ by Center or size of a project. This handbook is primarily guidance for project planning and control: however, the same principles apply to programs and generally apply to institutional planning and control.

  19. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Applicants should specify plans for proper organization, staffing, and management of the implementation... managing organization to conduct the proposed activities; qualifications of the project team and its... solicitation is permitted in this category. (b) Project objective. The purpose of these projects is to support...

  20. The Fermi LAT Very Important Project (VIP) List of Active Galactic Nuclei

    NASA Astrophysics Data System (ADS)

    Thompson, David J.; Fermi Large Area Telescope Collaboration

    2018-01-01

    Using nine years of Fermi Gamma-ray Space Telescope Large Area Telescope (LAT) observations, we have identified 30 projects for Active Galactic Nuclei (AGN) that appear to provide strong prospects for significant scientific advances. This Very Important Project (VIP) AGN list includes AGNs that have good multiwavelength coverage, are regularly detected by the Fermi LAT, and offer scientifically interesting timing or spectral properties. Each project has one or more LAT scientists identified who are actively monitoring the source. They will be regularly updating the LAT results for these VIP AGNs, working together with multiwavelength observers and theorists to maximize the scientific return during the coming years of the Fermi mission. See https://confluence.slac.stanford.edu/display/GLAMCOG/VIP+List+of+AGNs+for+Continued+Study

  1. Operation Ghost Dancer: The Use of Active Duty Army Forces in Marijuana Eradication.

    DTIC Science & Technology

    1991-03-11

    NO. NO. ACCESSION NO. 11. TITLE (Include Security Classification) OPERATION GHOST DANCER: The Use of Active Duty Army Forces in Marijuana Eradication...The Use of Active Duty Army Forces in Marijuana Eradication An Individual Study Project by Lieutenant Colonel Henry J. Richter United States Army...Dancer: The Use of Active Duty Army Forces in Marijuana Eradication Format: Individual Study Project Date: 11 March 1991 Pages: 70 Classification

  2. Research capacity building integrated into PHIT projects: leveraging research and research funding to build national capacity.

    PubMed

    Hedt-Gauthier, Bethany L; Chilengi, Roma; Jackson, Elizabeth; Michel, Cathy; Napua, Manuel; Odhiambo, Jackline; Bawah, Ayaga

    2017-12-21

    Inadequate research capacity impedes the development of evidence-based health programming in sub-Saharan Africa. However, funding for research capacity building (RCB) is often insufficient and restricted, limiting institutions' ability to address current RCB needs. The Doris Duke Charitable Foundation's African Health Initiative (AHI) funded Population Health Implementation and Training (PHIT) partnership projects in five African countries (Ghana, Mozambique, Rwanda, Tanzania and Zambia) to implement health systems strengthening initiatives inclusive of RCB. Using Cooke's framework for RCB, RCB activity leaders from each country reported on RCB priorities, activities, program metrics, ongoing challenges and solutions. These were synthesized by the authorship team, identifying common challenges and lessons learned. For most countries, each of the RCB domains from Cooke's framework was a high priority. In about half of the countries, domain specific activities happened prior to PHIT. During PHIT, specific RCB activities varied across countries. However, all five countries used AHI funding to improve research administrative support and infrastructure, implement research trainings and support mentorship activities and research dissemination. While outcomes data were not systematically collected, countries reported holding 54 research trainings, forming 56 mentor-mentee relationships, training 201 individuals and awarding 22 PhD and Masters-level scholarships. Over the 5 years, 116 manuscripts were developed. Of the 59 manuscripts published in peer-reviewed journals, 29 had national first authors and 18 had national senior authors. Trainees participated in 99 conferences and projects held 37 forums with policy makers to facilitate research translation into policy. All five PHIT projects strongly reported an increase in RCB activities and commended the Doris Duke Charitable Foundation for prioritizing RCB, funding RCB at adequate levels and time frames and for allowing flexibility in funding so that each project could implement activities according to their trainees' needs. As a result, many common challenges for RCB, such as adequate resources and local and international institutional support, were not identified as major challenges for these projects. Overall recommendations are for funders to provide adequate and flexible funding for RCB activities and for institutions to offer a spectrum of RCB activities to enable continued growth, provide adequate mentorship for trainees and systematically monitor RCB activities.

  3. Partners in projects: preparing for public involvement in health and social care research.

    PubMed

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  4. Sex Roles, Past, Present and Future; A Guide to Simulations, Games and Activities. 2nd Edition.

    ERIC Educational Resources Information Center

    Population Inst., Washington, DC.

    This brief listing describes games, activities, awareness exercises and projects which explore the realities and myths about the nature, history and potential of men and women. Among the activities are projects designed for children and adults, for individuals, groups, clubs, couples and classes. They can be used in self-education efforts, in…

  5. Science Art: Projects and Activities That Teach Science Concepts and Develop Process Skills. Grades 2-4.

    ERIC Educational Resources Information Center

    Schecter, Deborah

    The activities in this collection are designed to help teachers bring the worlds of science and art into the classroom. Each activity is both a hands-on science investigation and an art experience. As students create satisfying art projects, they utilize science skills such as observing, predicting, investigating, and communicating. The projects…

  6. Increasing Higher Level Thinking Skills in Science of Gifted Students in Grades 1-4 through "Hands-On" Activities.

    ERIC Educational Resources Information Center

    Dindial, Myrna J.

    This practicum was designed to increase higher level thinking skills of gifted students in primary school. The project sought to retrain students from recalling science information from the textbook to a more challenging and active form of learning through individual projects and small group and large group activities. Students were given…

  7. Developing Competency-Based Activities and Evaluation Instruments for the Advertising Service Area of Distribution. Final Report. Leadership Development Series: Advertising Services.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Div. of Teacher Development.

    To provide materials for a national exchange program and a Pennsylvania activities bank, a project was designed to produce materials for teacher-coordinators of high school distributive education. The project objectives were to (1) review and evaluate competencies necessary for advertising service careers, (2) develop activities and evaluative…

  8. 34 CFR 350.13 - What must a grantee do in carrying out a research activity?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What must a grantee do in carrying out a research... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.13 What must a grantee do in carrying out a research activity? In carrying out a research activity under this...

  9. 34 CFR 350.13 - What must a grantee do in carrying out a research activity?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What must a grantee do in carrying out a research... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.13 What must a grantee do in carrying out a research activity? In carrying out a research activity under this...

  10. Characteristics of the Process of Culture Development Project Activities (Culture of Social Engineering) at the Future Bachelors of Social Work

    ERIC Educational Resources Information Center

    Nikitina, Natalya I.; Romanova, Elena Yu.; Vasilyeva, Tatyana V.; Nikishina, Irina N.; Grebennikova, Veronica M.

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate's (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of…

  11. The OhioView Project

    USGS Publications Warehouse

    1998-01-01

    The Ohio View Consortium is a group of universities, colleges, K-12 schools, libraries, and local and State government agencies in the State of Ohio working with the USGS and NASA to provide affordable, integrated access to and delivery of U.S. Government satellite and geospatial data. The Ohio View Project is a pilot project that combines the USGS activities in providing an integrated information access and delivery capability with the activities of the Ohio View Consortium 

  12. An investigation of air transportation technology at the Massachusetts Institute of Technology, 1992-1993

    NASA Technical Reports Server (NTRS)

    Simpson, Robert W.

    1994-01-01

    An investigation of air transportation technology at MIT during 1992 - 1993 is presented. One completed project and two continuing research activities are under the sponsorship of the FAA/NASA Joint University Program. The completed project was on tracking aircraft around a turn with wind effects. Active research projects are on ASLOTS - an interactive adaptive system of automated approach spacing of aircraft and alerting in automated and datalink capable cockpits.

  13. 75 FR 51821 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    ... through the use of automated collection techniques or other forms of information technology. Consideration... Information Collection Activity; Comment Request Proposed Projects: Title: Projects of National Significance...? This information will inform public policy regarding the best methods to deliver important supports to...

  14. The Effectiveness of Selected Dissemination Activities.

    ERIC Educational Resources Information Center

    Chapman, David W.; Johnson, Russell H.

    1981-01-01

    The dissemination activities through which college admissions officers heard about Project CHOICE, a three-year project to help colleges improve the information they provided to prospective students, were investigated. The study involved determining how well various dissemination methods (newsletter, journal articles, conference presentations,…

  15. 78 FR 8192 - Agency Information Collection Activities: Comment Request; Education and Human Resources Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request; Education and Human Resources Project Monitoring Clearance AGENCY: National Science Foundation. ACTION: Notice... part of its continuing effort to reduce paperwork and respondent burden, the National Science...

  16. The Angra Neutrino Project: precise measurement of {theta}{sub 13} and safeguards applications of neutrino detectors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casimiro, E.; Anjos, J. C.

    2009-04-20

    We present an introduction to the Angra Neutrino Project. The goal of the project is to explore the use of neutrino detectors to monitor the reactor activity. The Angra Project, willl employ as neutrino sources the reactors of the nuclear power complex in Brazil, located in Angra dos Reis, some 150 Km south from the city of Rio de Janeiro. The Angra collaboration will develop and operate a low-mass neutrino detector to monitor the nuclear reactor activity, in particular to measure the reactor thermal power and the reactor fuel isotopic composition.

  17. The Angra Neutrino Project: precise measurement of θ13 and safeguards applications of neutrino detectors

    NASA Astrophysics Data System (ADS)

    Casimiro, E.; Anjos, J. C.

    2009-04-01

    We present an introduction to the Angra Neutrino Project. The goal of the project is to explore the use of neutrino detectors to monitor the reactor activity. The Angra Project, willl employ as neutrino sources the reactors of the nuclear power complex in Brazil, located in Angra dos Reis, some 150 Km south from the city of Rio de Janeiro. The Angra collaboration will develop and operate a low-mass neutrino detector to monitor the nuclear reactor activity, in particular to measure the reactor thermal power and the reactor fuel isotopic composition.

  18. Changes in DSTO Support to Projects Arising From the 6th July 2006 DCIC Decision: Updated Guidance for Project S&T Plans

    DTIC Science & Technology

    2007-02-01

    responsible to the Government for certifying these technical risks [4] and [5] The current funding model for Project S&T Plans is: • Pre-First...the new costing spreadsheets at Annexes C-E. 3.1 A complete set of S&T Activities The 6th July 2006 DCIC decisions to change the funding model increase...changes to the funding model mean that the set of S&T Activities in the Project S&T Plans will need to be categorised in new ways to fit in with the

  19. Space market model development project, phase 3

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Hamel, Gary P.

    1989-01-01

    The results of a research project investigating information needs for space commercialization is described. The Space Market Model Development Project (SMMDP) was designed to help NASA identify the information needs of the business community and to explore means to meet those needs. The activity of the SMMDP is reviewed and a report of its operation via three sections is presented. The first part contains a brief historical review of the project since inception. The next part reports results of Phase 3, the most recent stage of activity. Finally, overall conclusions and observations based on the SMMDP research results are presented.

  20. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  1. 45 CFR 2552.25 - What are a sponsor's administrative responsibilities?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operate the project successfully. (b) Provide levels of staffing and resources appropriate to accomplish the purposes of the project and carry out its project management responsibilities. (c) Employ a full... management policies and procedures covering project and Foster Grandparent activities. This includes...

  2. 45 CFR 2552.25 - What are a sponsor's administrative responsibilities?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operate the project successfully. (b) Provide levels of staffing and resources appropriate to accomplish the purposes of the project and carry out its project management responsibilities. (c) Employ a full... management policies and procedures covering project and Foster Grandparent activities. This includes...

  3. 45 CFR 2552.25 - What are a sponsor's administrative responsibilities?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operate the project successfully. (b) Provide levels of staffing and resources appropriate to accomplish the purposes of the project and carry out its project management responsibilities. (c) Employ a full... management policies and procedures covering project and Foster Grandparent activities. This includes...

  4. 45 CFR 2552.25 - What are a sponsor's administrative responsibilities?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operate the project successfully. (b) Provide levels of staffing and resources appropriate to accomplish the purposes of the project and carry out its project management responsibilities. (c) Employ a full... management policies and procedures covering project and Foster Grandparent activities. This includes...

  5. Cross-sectional analysis of self-efficacy and social capital in a community-based healthy village project in Santa Cruz, Bolivia.

    PubMed

    Yuasa, Motoyuki; Shirayama, Yoshihisa; Osato, Keiichi; Miranda, Cesar; Condore, Julia; Siles, Roxana

    2015-06-20

    An assessment of self-efficacy and social capital may have the potential to detect an effect of dynamic, complex and comprehensive collective actions in community-based health promotion. In 2003, a healthy village project was launched in Santa Cruz, Bolivia with technical assistance from the Japan International Cooperation Agency (JICA). The originally developed FORSA (Fortalecimiento de Redes de Salud) model accounted for participatory processes in which people could improve their health and well-being through individual behavioral changes and family/community-driven activities. This study aimed to examine the extent of self-efficacy and social capital obtained via project activities by a cross-sectional analysis. We randomly selected 340 subjects from the healthy village project site and 113 subjects from a control area. Both groups were interviewed using the same structured questionnaire. Self-efficacy was assessed with a General Self-Efficacy Scale (GSES), while social capital was measured as the frequency of formal group participation in community meetings during the past three months, perceived social solidarity, and general trust. The study results showed that the participants in the project site had higher self-efficacy and social capital compared to those in the control site. The number of times a subject participated in the health committee activities was positively associated with the self-efficacy scale. Regarding social capital, females and lower-educated people were more likely to have had more frequent participation in formal groups; males and higher-educated participants showed less formal group participation, but more generosity to contribute money for the community. The main perceived benefit of participation in formal group activities varied among individuals. The findings suggest that people in the healthy village project site have higher self-efficacy, especially those with active participation in the health committee activities. To recruit more participants in future healthy village projects, we should consider the gender and level of education, and match the perceived benefits of participants accordingly.

  6. Operational research within a Global Fund supported tuberculosis project in India: why, how and its contribution towards change in policy and practice.

    PubMed

    Sagili, Karuna D; Satyanarayana, Srinath; Chadha, Sarabjit S; Wilson, Nevin C; Kumar, Ajay M V; Moonan, Patrick K; Oeltmann, John E; Chadha, Vineet K; Nagaraja, Sharath Burugina; Ghosh, Smita; Q Lo, Terrence; Volkmann, Tyson; Willis, Matthew; Shringarpure, Kalpita; Reddy, Ravichandra Chinnappa; Kumar, Prahlad; Nair, Sreenivas A; Rao, Raghuram; Yassin, Mohammed; Mwangala, Perry; Zachariah, Rony; Tonsing, Jamhoih; Harries, Anthony D; Khaparde, Sunil

    2018-01-01

    The Global Fund encourages operational research (OR) in all its grants; however very few reports describe this aspect. In India, Project Axshya was supported by a Global Fund grant to improve the reach and visibility of the government Tuberculosis (TB) services among marginalised and vulnerable communities. OR was incorporated to build research capacity of professionals working with the national TB programme and to generate evidence to inform policies and practices. To describe how Project Axshya facilitated building OR capacity within the country, helped in addressing several TB control priority research questions, documented project activities and their outcomes, and influenced policy and practice. From September 2010 to September 2016, three key OR-related activities were implemented. First, practical output-oriented modular training courses were conducted (n = 3) to build research capacity of personnel involved in the TB programme, co-facilitated by The Union, in collaboration with the national TB programme, WHO country office and CDC, Atlanta. Second, two large-scale Knowledge, Attitude and Practice (KAP) surveys were conducted at baseline and mid-project to assess the changes pertaining to TB knowledge, attitudes and practices among the general population, TB patients and health care providers over the project period. Third, studies were conducted to describe the project's core activities and outcomes. In the training courses, 44 participant teams were supported to develop research protocols on topics of national priority, resulting in 28 peer-reviewed scientific publications. The KAP surveys and description of project activities resulted in 14 peer-reviewed publications. Of the published papers at least 12 have influenced change in policy or practice. OR within a Global Fund supported TB project has resulted in building OR capacity, facilitating research in areas of national priority and influencing policy and practice. We believe this experience will provide guidance for undertaking OR in Global Fund projects.

  7. Controlled Ecological Life Support System Breadboard Project - 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  8. Cholinergic Neurons Excite Cortically Projecting Basal Forebrain GABAergic Neurons

    PubMed Central

    Yang, Chun; McKenna, James T.; Zant, Janneke C.; Winston, Stuart; Basheer, Radhika

    2014-01-01

    The basal forebrain (BF) plays an important role in the control of cortical activation and attention. Understanding the modulation of BF neuronal activity is a prerequisite to treat disorders of cortical activation involving BF dysfunction, such as Alzheimer's disease. Here we reveal the interaction between cholinergic neurons and cortically projecting BF GABAergic neurons using immunohistochemistry and whole-cell recordings in vitro. In GAD67-GFP knock-in mice, BF cholinergic (choline acetyltransferase-positive) neurons were intermingled with GABAergic (GFP+) neurons. Immunohistochemistry for the vesicular acetylcholine transporter showed that cholinergic fibers apposed putative cortically projecting GABAergic neurons containing parvalbumin (PV). In coronal BF slices from GAD67-GFP knock-in or PV-tdTomato mice, pharmacological activation of cholinergic receptors with bath application of carbachol increased the firing rate of large (>20 μm diameter) BF GFP+ and PV (tdTomato+) neurons, which exhibited the intrinsic membrane properties of cortically projecting neurons. The excitatory effect of carbachol was blocked by antagonists of M1 and M3 muscarinic receptors in two subpopulations of BF GABAergic neurons [large hyperpolarization-activated cation current (Ih) and small Ih, respectively]. Ion substitution experiments and reversal potential measurements suggested that the carbachol-induced inward current was mediated mainly by sodium-permeable cation channels. Carbachol also increased the frequency of spontaneous excitatory and inhibitory synaptic currents. Furthermore, optogenetic stimulation of cholinergic neurons/fibers caused a mecamylamine- and atropine-sensitive inward current in putative GABAergic neurons. Thus, cortically projecting, BF GABAergic/PV neurons are excited by neighboring BF and/or brainstem cholinergic neurons. Loss of cholinergic neurons in Alzheimer's disease may impair cortical activation, in part, through disfacilitation of BF cortically projecting GABAergic/PV neurons. PMID:24553925

  9. Designing Citizen Science Projects in the Era of Mega-Information and Connected Activism

    NASA Astrophysics Data System (ADS)

    Pompea, S. M.

    2010-12-01

    The design of citizen science projects must take many factors into account in order to be successful. Currently, there are a wide variety of citizen science projects with different aims, audiences, reporting methods, and degrees of scientific rigor and usefulness. Projects function on local, national, and worldwide scales and range in time from limited campaigns to around the clock projects. For current and future projects, advanced cell phones and mobile computing allow an unprecedented degree of connectivity and data transfer. These advances will greatly influence the design of citizen science projects. An unprecedented amount of data is available for data mining by interested citizen scientists; how can projects take advantage of this? Finally, a variety of citizen scientist projects have social activism and change as part of their mission and goals. How can this be harnessed in a constructive and efficient way? The design of projects must also select the proper role for experts and novices, provide quality control, and must motivate users to encourage long-term involvement. Effective educational and instructional materials design can be used to design responsive and effective projects in a more highly connected age with access to very large amounts of information.

  10. Active Living Logan Square: joining together to create opportunities for physical activity.

    PubMed

    Gomez-Feliciano, Lucy; McCreary, Linda L; Sadowsky, Rob; Peterson, Serena; Hernandez, Adolfo; McElmurry, Beverly J; Park, Chang Gi

    2009-12-01

    The Active Living Logan Square target audience is the community of the southwest corner of Logan Square, an urban Chicago community of 84,466 residents, mostly Latinos. Through the Active Living by Design (ALbD) initiative, the Logan Square Neighborhood Association leveraged its 48 years of existence in the neighborhood to create opportunities and build partnerships. Activities addressed three primary goals: (1) enhance school environments and practices to support physical activity before, during, and after the school day; (2) encourage individuals and families to enjoy outdoor activities in their own communities; and (3) create safe, inviting places for activity that connect to surrounding communities. The partnership's participatory approach involved a variety of community stakeholders in developing and implementing affordable, accessible, culturally acceptable, and sustainable physical activities for children and their families. The partnership successfully piloted Open Streets (temporary street closures) and advocated for development of the Bloomingdale Trail, an elevated rails-to-trails project. In schools, the partnership changed the culture at McAuliffe Elementary to support healthy behaviors through new policies, physical projects, and programs. Vital components of the project's success included a full-time coordinator with strong community ties; time to build healthy relationships within the partnership and community; the use of culturally relevant strategies; and flexibility to welcome complementary opportunities. The partnership intentionally did not produce a single community-recognized campaign; instead, it chose to use limited resources to promote tangible programs and projects that led to sustainable and replicable changes that promote physical activity.

  11. Georgia Deaf-Blind Project. Final Report, 1992-1995. State and Multi-State Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of the Georgia Deaf-Blind Project, a 3-year federally supported project encompassing 159 counties and providing technical assistance to 237 infants, children, and youth with deaf-blindness along with their families and their service providers. Project accomplishments included: (1) more…

  12. EU-UNAWE Project: Inspiring every child with our wonderful cosmos

    NASA Astrophysics Data System (ADS)

    Arisa, E.; Fabregat, J.; Ros, R. M.

    2013-05-01

    The Project UNAWE was born in 2005 with the intention that children, of every country and every economical and social condition, can be in touch with astronomy. This is the first large-scale attempt to use astronomy as a tool to inspire and educate very young children. Project resources are open to everyone, but are mainly tailored to boys and girls aged 4 to 10. The Project is implemented in countries from all over the world, supporting the activities that are performed there. The European project EU-UNAWE funded by the European Union, includes six countries: Germany, Italy, the Netherlands, United Kingdom, South Africa and Spain. EU-UNAWE Spain bases its activity in conducting training courses for teachers: in Barcelona in November 2011, in Granada and Madrid in February 2012 and in Pamplona in May 2012. Just as in the publication of educational materials: practical activities, experiences, books made by teachers... available in the entire Spanish-speaking world. All this can be accessed through the website of the program (http://es.unawe.org).

  13. From the past to the future: Integrating work experience into the design process.

    PubMed

    Bittencourt, João Marcos; Duarte, Francisco; Béguin, Pascal

    2017-01-01

    Integrating work activity issues into design process is a broadly discussed theme in ergonomics. Participation is presented as the main means for such integration. However, a late participation can limit the development of both project solutions and future work activity. This article presents the concept of construction of experience aiming at the articulated development of future activities and project solutions. It is a non-teleological approach where the initial concepts will be transformed by the experience built up throughout the design process. The method applied was a case study of an ergonomic participation during the design of a new laboratory complex for biotechnology research. Data was obtained through analysis of records in a simulation process using a Lego scale model and interviews with project participants. The simulation process allowed for developing new ways of working and generating changes in the initial design solutions, which enable workers to adopt their own developed strategies for conducting work more safely and efficiently in the future work system. Each project decision either opens or closes a window of opportunities for developing a future activity. Construction of experience in a non-teleological design process allows for understanding the consequences of project solutions for future work.

  14. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  15. 75 FR 15421 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... the status of activities, project progress, jobs created and retained, spend rates and performance... information that DOE is developing to collect data on the status of activities, project progress, jobs created and retained, spend rates and performance metrics under the American Recovery and Reinvestment Act of...

  16. Film-Making as a School Activity.

    ERIC Educational Resources Information Center

    Beal, J. David

    1969-01-01

    Fiction film production--begun several years ago to stimulate the participation of all students in dramatic and creative activities--has become a vital part of a school program, involving project organization and interdepartmental cooperation. The English department initiates the project, which provides ample opportunities for promoting linguistic…

  17. Integrating NASA Dryden Research Endeavors into the Teaching-Learning of Mathematics in the K-12 Classroom via the WWW

    NASA Technical Reports Server (NTRS)

    Ward, Robin A.

    2002-01-01

    The primary goal of this project was to continue populating the currently existing web site developed in 1998 in conjunction with the NASA Dryden Flight Research Center and California Polytechnic State University, with more mathematics lesson plans and activities that K-12 teachers, students, home-schoolers, and parents could access. All of the activities, while demonstrating some mathematical topic, also showcase the research endeavors of the NASA Dryden Flight Research Center. The website is located at: http://daniel.calpoly.edu/dfrc/Robin. The secondary goal of this project was to share the web-based activities with educators at various conferences and workshops. To address the primary goal of this project, over the past year, several new activities were posted on the web site and some of the existing activities were enhanced to contain more video clips, photos, and materials for teachers. To address the project's secondary goal, the web-based activities were showcased at several conferences and workshops. Additionally, in order to measure and assess the outreach impact of the web site, a link to the web site hitbox.com was established in April 2001, which allowed for the collection of traffic statistics against the web site (such as the domains of visitors, the frequency of visitors to this web site, etc.) Provided is a description of some of the newly created activities posted on the web site during the project period of 2001-2002, followed by a description of the conferences and workshops at which some of the web-based activities were showcased. Next is a brief summary of the web site's traffic statistics demonstrating its worldwide educational impact, followed by a listing of some of the awards and accolades the web site has received.

  18. Golden Gate Vanpool Demonstration Project

    DOT National Transportation Integrated Search

    1979-07-01

    The report evaluates the Golden Gate Vanpool Demonstration Project activities begun in October 1977. The objective of the demonstration is to successfuly promote commuter ridesharing through vanpools. The project grantee, the Golden Gate Bridge, High...

  19. Revision 2 of the Enbridge Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This Quality Assurance Project Plan (QAPP) presents Revision 2 of the organization, objectives, planned activities, and specific quality assurance/quality control (QA/QC) procedures associated with the Enbridge Marshall Pipeline Release Project.

  20. Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory.

    PubMed

    Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira

    2018-02-19

    Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.

  1. 15 CFR 292.4 - Information infrastructure projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authority of the governing or managing organization to conduct the proposed activities; qualifications of... each solicitation for unique projects. (b) Project objective. The purpose of these projects is to... funding in connection with that award. Renewal of an award to increase funding or extend the period of...

  2. 15 CFR 292.2 - Training development and deployment projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to the proposer or from other organizations. Factors that may be considered include: Adequacy of the... authority of the governing or managing organization to conduct the proposed activities; qualifications of... in each solicitation for unique projects. (b) Project objective. The purpose of these projects is to...

  3. Framing the Future: People, Places, Projects.

    ERIC Educational Resources Information Center

    Knapsey, Kath

    This publication describes six Framing the Future (FTF) staff development projects that use work-based learning with different project teams and learning activities varying from general awareness to specific skills development in Australia. "The Center for Human Services--Working for Its People" describes a project that introduced a…

  4. Project EAGLE (Early Academic Gifted Learning Experience): A Program for Gifted and Talented Students (Grades K-3)--Kindergarten Activity Booklets: Xanthus; Zhack; and Activity Pages H-Z.

    ERIC Educational Resources Information Center

    Merkoski, Kay

    Three activity booklets are presented for implementing Project EAGLE, an enrichment program for gifted and talented kindergarten children. The first activity booklet contains a poem by J. D. Evans titled "In Search of the Xanthus," which describes the search for an imaginary beast that leaves an "X" on the spot where it used to be. The second…

  5. Wiggles and Wags: Dog 1--Fun Activities for You and Your Dog. 4-H Skills for Life Animal Series. National 4-H Curriculum. BU-08166

    ERIC Educational Resources Information Center

    National 4-H Council, 2005

    2005-01-01

    These guides are activity guides. Several fact-filled books about dogs are listed as resources on this guide. The activities are active, hands-on, and engaging and are guided by the 4-H motto: Learning by Doing. As youth explore a dog project topic of interest to them, they also practice essential life skills. Although a few dog project youth will…

  6. 3Hs Education: Examining hands-on, heads-on and hearts-on early childhood science education

    NASA Astrophysics Data System (ADS)

    Zeynep Inan, Hatice; Inan, Taskin

    2015-08-01

    Active engagement has become the focus of many early childhood science education curricula and standards. However, active engagement usually emphasizes getting children engaged with science solely through hands-on activities. Active engagement by way of hands, heads, and hearts are kept separate and rarely discussed in terms of getting all to work together, although inquiry-based education and student interest have been accepted as important in science education. The current study is an inquiry-based research. It aims to describe and examine projects and activity stations for preschoolers in a Turkish preschool classroom bringing together the pieces of the puzzle of science education, called here 'Hands-Heads-Hearts-on Science Education'. The study, conducted from a qualitative-interpretivist paradigm, reveals that activity stations and projects create a context for hands-on (active engagement), heads-on (inquiry based or mental-engagement), and hearts-on (interest based) science education. It is found that activity stations and projects, when maintained by appropriate teacher-support, create a playful context in which children can be actively and happily engaged in science-related inquiry.

  7. Nevada National Security Site Industrial Sites Project Closeout - 12498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin; Krauss, Mark; Matthews, Pat

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)« less

  8. How much are researchers aware of the ethical and social implications of their activities? The example of the European Project ENVRI Plus

    NASA Astrophysics Data System (ADS)

    Peppoloni, Silvia; Di Capua, Giuseppe; Haslinger, Florian

    2017-04-01

    Over the last years the attention to ethical and social aspects of scientific research has grown remarkably. Large scientific projects that refer to environment, resources, or natural hazards, assign great importance to the topics of big data and data management, environmental impact, science dissemination and education. These topics are also analyzed from an ethical and social perspective, recognizing the close relation to and evident repercussions on the life and activity of the human communities touched by those projects. ENVRIplus is a Horizon2020 project in which ethics applied to geosciences features as a fundamental issue, at the base of scientific activities. It brings together Environmental and Earth System Research Infrastructures (RIs), projects, and networks, with technical specialist partners to create a more coherent, interdisciplinary and interoperable cluster of Environmental Research Infrastructures across Europe (http://www.envriplus.eu/). In ENVRIplus, ethics applied to geosciences features as a fundamental issue at the base of scientific activities. Within the theme "Societal relevance and understanding", an entire work package aims at developing an ethical framework for RIs. Its objectives are: • increase the awareness of both the scientists and the public on the importance of ethical aspects in Earth and Environmental sciences; • establish a shared ethical reference framework, to be adopted by RIs governing bodies; • increase the awareness of RIs management and operational levels and of the individual involved scientists on their social role in conducting research activities and research work environment; • assess the ethical and social aspects related to the results achieved and deliverables released within the project. As one element of this work we created a questionnaire to investigate how each RI participating in ENVRI Plus faces ethical issues in relation to its activities, and so to understand the level of perception that researchers and technicians involved in the project have on the ethical implications of their scientific activities. Here we present and discuss the results of this survey, together with the next steps towards the formulation of an ethical reference framework.

  9. Water-resources investigations in Pennsylvania; programs and activities of the U.S. Geological Survey, 1993

    USGS Publications Warehouse

    McLanahan, L. O.

    1993-01-01

    Current activities of the Pennsylvania District of the USGS are described and include information on current projects, such as project objectives, approach, progress and plans, project location, cooperators, period of project, and project chief. Basic-data programs for surface water, ground water, and quality of water also are described. Also included is information on the basic mission and programs of the USGS; program funding and cooperation for fiscal year 1993; the USGS water- data program, National Water-Data Exchange, and National Water-Data Storage and Retrieval System; and Pennsylvania data-collection programs and hydrologic investigations. List of publications of the Pennsylvania District and maps published by the USGS, as well as information on how to obtain them, are included.

  10. Coal to methanol feasiblity study: Beluga methanol project. Volume 4: Environmental

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The major environmental issues relevant to development of a coal gasification and methanol fuels production facility and related coal mining activities and transportation systems in the west Cook Inlet area, Alaska were assessed. An extensive review into existing information on the Beluga region of west Cook Inlet was conducted and updated with the findings of land resource projects. Specific field activities then were initiated to expand the environmental data base in areas relevant to this project where there was a paucity of information. Based on these findings the project was reviewed in detail to identify significant environmental issues and to outline the state and federal permit requirements to ensure that these element are an integral component of all subsequent project planning and management decisions.

  11. Bioinformatics Projects Supporting Life-Sciences Learning in High Schools

    PubMed Central

    Marques, Isabel; Almeida, Paulo; Alves, Renato; Dias, Maria João; Godinho, Ana; Pereira-Leal, José B.

    2014-01-01

    The interdisciplinary nature of bioinformatics makes it an ideal framework to develop activities enabling enquiry-based learning. We describe here the development and implementation of a pilot project to use bioinformatics-based research activities in high schools, called “Bioinformatics@school.” It includes web-based research projects that students can pursue alone or under teacher supervision and a teacher training program. The project is organized so as to enable discussion of key results between students and teachers. After successful trials in two high schools, as measured by questionnaires, interviews, and assessment of knowledge acquisition, the project is expanding by the action of the teachers involved, who are helping us develop more content and are recruiting more teachers and schools. PMID:24465192

  12. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketingmore » tools to support outreach efforts targeting the public, vendors, investors and government audiences.« less

  13. World Energy Projection System Plus (WEPS ): Global Activity Module

    EIA Publications

    2016-01-01

    The World Energy Projection System Plus (WEPS ) is a comprehensive, mid?term energy forecasting and policy analysis tool used by EIA. WEPS projects energy supply, demand, and prices by country or region, given assumptions about the state of various economies, international energy markets, and energy policies. The Global Activity Module (GLAM) provides projections of economic driver variables for use by the supply, demand, and conversion modules of WEPS . GLAM’s baseline economic projection contains the economic assumptions used in WEPS to help determine energy demand and supply. GLAM can also provide WEPS with alternative economic assumptions representing a range of uncertainty about economic growth. The resulting economic impacts of such assumptions are inputs to the remaining supply and demand modules of WEPS .

  14. Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less

  15. Integrating Field-Centered, Project Based Activities with Academic Year Coursework: A Curriculum Wide Approach

    NASA Astrophysics Data System (ADS)

    Kelso, P. R.; Brown, L. M.

    2015-12-01

    Based upon constructivist principles and the recognition that many students are motivated by hands-on activities and field experiences, we designed a new undergraduate curriculum at Lake Superior State University. One of our major goals was to develop stand-alone field projects in most of the academic year courses. Examples of courses impacted include structural geology, geophysics, and geotectonics, Students learn geophysical concepts in the context of near surface field-based geophysical studies while students in structural geology learn about structural processes through outcrop study of fractures, folds and faults. In geotectonics students learn about collisional and rifting processes through on-site field studies of specific geologic provinces. Another goal was to integrate data and samples collected by students in our sophomore level introductory field course along with stand-alone field projects in our clastic systems and sequence stratigraphy courses. Our emphasis on active learning helps students develop a meaningful geoscience knowledge base and complex reasoning skills in authentic contexts. We simulate the activities of practicing geoscientists by engaging students in all aspects of a project, for example: field-oriented project planning and design; acquiring, analyzing, and interpreting data; incorporating supplemental material and background data; and preparing oral and written project reports. We find through anecdotal evidence including student comments and personal observation that the projects stimulate interest, provide motivation for learning new concepts, integrate skill and concept acquisition vertically through the curriculum, apply concepts from multiple geoscience subdisiplines, and develop soft skills such as team work, problem solving, critical thinking and communication skills. Through this projected-centered Lake Superior State University geology curriculum students practice our motto of "learn geology by doing geology."

  16. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  17. Software Smarts

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Under an SBIR (Small Business Innovative Research) contract with Johnson Space Center, Knowledge Based Systems Inc. (KBSI) developed an intelligent software environment for modeling and analyzing mission planning activities, simulating behavior, and, using a unique constraint propagation mechanism, updating plans with each change in mission planning activities. KBSI developed this technology into a commercial product, PROJECTLINK, a two-way bridge between PROSIm, KBSI's process modeling and simulation software and leading project management software like Microsoft Project and Primavera's SureTrak Project Manager.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toro, Javier, E-mail: jjtoroca@unal.edu.co; Requena, Ignacio, E-mail: requena@decsai.ugr.es; Duarte, Oscar, E-mail: ogduartev@unal.edu.co

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes themore » inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown.« less

  19. Meaningful Cost-Benefit Analysis for Service-Oriented Architecture Projects

    DTIC Science & Technology

    2010-05-01

    SOA to identify these activities and shows how those costs come to be commingled with other development and maintenance activities. The paper argues...affected by SOA . To be consistent with the separation suggested above, this paper suggests the following new activities: • Enterprise architecture...Government or Federal Rights License 14. ABSTRACT This paper argues that proper cost-benefit analysis of service-oriented architecture projects is not

  20. A temporal importance-performance analysis of recreation attributes on national forests: a technical document supporting the Forest Service update of the 2010 RPA Assessment

    Treesearch

    Ashley E. Askew; J.M. Bowker; Donald B.K. English; Stanley J. Zarnoch; Gary T. Green

    2017-01-01

    The outdoor recreation component of the 2010 Resources Planning Act (RPA) Assessment provided projections and modeling of participation and intensity by activity. Results provided insight into the future of multiple outdoor recreation activities through projections of participation rates, numbers of participants, days per participant, and total activity days. These...

  1. Abstracts of Innovative/Exemplary Activities in Industrial Teacher Education in the State of Michigan (MCITE Report-G Rev. 1976).

    ERIC Educational Resources Information Center

    Nee, Johm G., Comp.; Matson, Johm H., Comp.

    This report is composed of a series of abstracts describing innovative/exemplary activities in industrial education in Michigan. The activities included (1) projects which invent a creative solution to a problem; (2) projects which demonstrate an exemplary program suitable for widespread use or a model to emulate; and (3) adoption of an exemplary…

  2. Telep@b Project: Towards a Model for eParticipation and a Case Study in Participatory Budgeting

    NASA Astrophysics Data System (ADS)

    Paganelli, Federica; Giuli, Dino

    eParticipation concerns the use of ICT tools for facilitating the two-way communication between governments and citizens. Designing eParticipation activities is a complex task. Challenges include the need of interdisciplinary expertise and knowledge (for example, political, sociology, usability and technology domains) and the lack of widely accepted models and standards. This paper attempts to provide a model for eParticipation, aiming at providing guidelines for the design, implementation and management of eParticipation applications. This model has been put into practice for the design of an eParticipation portal in the framework of the Telep@b project. We also report on the experimental use of the portal services in a group of Tuscany municipalities for supporting participatory budget activities and future activities in a follow-on project (PAAS_Telep@b project).

  3. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    PubMed

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  4. 76 FR 4703 - Proposed Information Collection Activity; Comment Request Proposed Projects:

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Information Collection Activity; Comment Request Proposed Projects: Title: Computerized Support Enforcement Systems. OMB No. 0980-0271. Description: The information being collected is mandated by Section 454(16) of...) approved under section 452(d) of the title, of a statewide automated data processing and information...

  5. Consumer & Home Economics In-Service/Curriculum Development.

    ERIC Educational Resources Information Center

    McGillicuddy (Shirley) & Associates, Sierra Madre, CA.

    Mt. San Antonio Community College District's Consumer/Home Economics In-Service/Curriculum Development Project was designed to provide activities to meet staff development and program improvement needs. The choice of activities was based on evaluation data from previous home economics projects, and priorities identified by the Consumer/Home…

  6. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... selecting economic development projects. 570.209 Section 570.209 Housing and Urban Development Regulations... DEVELOPMENT BLOCK GRANTS Eligible Activities § 570.209 Guidelines for evaluating and selecting economic... activities to be carried out for economic development purposes. Specifically, these guidelines are applicable...

  7. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... selecting economic development projects. 570.209 Section 570.209 Housing and Urban Development Regulations... DEVELOPMENT BLOCK GRANTS Eligible Activities § 570.209 Guidelines for evaluating and selecting economic... activities to be carried out for economic development purposes. Specifically, these guidelines are applicable...

  8. Formative Evaluation of Project "TEAM" (Teens Making Environment and Activity Modifications)

    ERIC Educational Resources Information Center

    Kramer, Jessica M.; Roemer, Kristin; Liljenquist, Kendra; Shin, Julia; Hart, Stacy

    2014-01-01

    Research documents the negative impact of physical and social environmental barriers on engagement in school, work, and the community for youth with intellectual and /or developmental disabilities (IDD). Project "TEAM" (Teens making Environment and Activity Modifications) was designed to teach youth to systematically identify…

  9. This modified F/A-18A is the test aircraft for the Active Aeroelastic Wing (AAW) project at NASA's D

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This modified F/A-18A sporting a distinctive red, white and blue paint scheme is the test aircraft for the Active Aeroelastic Wing (AAW) project at NASA's Dryden Flight Research Center, Edwards, California.

  10. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  11. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  12. 77 FR 24505 - Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ...] Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings AGENCY... for Wind Retrofit Projects for Existing Residential Buildings. DATES: Comments must be received by... property from hazards and their effects. One such activity is the implementation of wind retrofit projects...

  13. Public Scholarship Student Projects for Introductory Environmental Courses

    ERIC Educational Resources Information Center

    Baum, Seth D.; Aman, Destiny D.; Israel, Andrei L.

    2012-01-01

    This paper presents a model project for introductory undergraduate courses that develops students as citizens contributing scholarship to public discussions of environmental issues. In this field-based project, students actively and independently engage with an environmental issue and present their project experience to a relevant public forum. In…

  14. Community Based Education Activities in Southeastern Region Teacher Corps Projects.

    ERIC Educational Resources Information Center

    White, Martha; Bonney, Nancy

    To gather information on the community councils mandated for each Teacher Corps project, this pilot study surveyed 34 project directors and council chairpersons in 24 southeastern projects initiated in 1978 and 1979. The study's questionnaires asked about community council elections, membership, training, leadership, meetings, procedures, interest…

  15. 34 CFR 664.14 - What is an advanced overseas intensive language training project?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What is an advanced overseas intensive language... overseas intensive language training project? (a)(1) An advanced overseas intensive language project is... United States when providing intensive advanced foreign language training. (2) Project activities may be...

  16. Preparing project managers for faster-better-cheaper robotic planetary missions

    NASA Technical Reports Server (NTRS)

    Gowler, P.; Atkins, K.

    2003-01-01

    The authors have developed and implemented a week-long workshop for Jet Propulsion Laboratory Project Managers, designed around the development phases of the JPL Project Life Cycle. The workshop emphasizes the specific activities and deliverables that pertain to JPL managers of NASA robotic space exploration and instrument development projects.

  17. Current Programme.

    ERIC Educational Resources Information Center

    Bernard Van Leer Foundation, The Hague (Netherlands).

    This document provides brief descriptions of the major projects supported in 1989 by the Bernard van Leer Foundation. A total of 94 projects are covered. Each is described in terms of: (1) the sponsoring institution; (2) the title of the project; (3) the duration of project activities supported by the foundation; and (4) a description of the…

  18. 7 CFR 1486.103 - Are regional projects possible under the program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... consideration provided such projects target qualifying emerging markets in the specified region. CCC may consider activities which target qualified emerging markets in a specific region, but are conducted in a... MARKETS PROGRAM General Information § 1486.103 Are regional projects possible under the program? Projects...

  19. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  20. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  1. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  2. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  3. Project SAIL: A Summer Program Brings History Alive for Students.

    ERIC Educational Resources Information Center

    Hollingsworth, Patricia

    2001-01-01

    This project describes Project SAIL (Schools for Active Interdisciplinary Learning), a federally funded project providing in-depth staff development during a 3-week summer program for teachers, parents, and their gifted/talented economically disadvantaged students. The program theme, "Searching for Patterns in History," has been used with students…

  4. Let's Build a Sailboat: A Differentiated Gifted Education Project.

    ERIC Educational Resources Information Center

    Forster, Bruce R.

    1990-01-01

    A rationale is presented for developing gifted education projects that are differentiated from the regular curriculum. A specific activity, called "Let's Build a Sailboat," is described to illustrate guiding principles for success in student project development. The project taught planning and management skills to junior high school gifted…

  5. Using Independent Research Projects to Foster Learning in the Comparative Vertebrate Anatomy Laboratory

    ERIC Educational Resources Information Center

    Ghedotti, Michael J.; Fielitz, Christopher; Leonard, Daniel J.

    2005-01-01

    This paper presents a teaching methodology involving an independent research project component for use in undergraduate Comparative Vertebrate Anatomy laboratory courses. The proposed project introduces cooperative, active learning in a research context to comparative vertebrate anatomy. This project involves pairs or groups of three students…

  6. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  7. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  8. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  9. 76 FR 8804 - Agency Information Collection Activities: Revision and Approval of Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... of external factors on Project expectations. Including an ex post examination of project... consist of a narrative discussion detailing project successes and/or the influence of external factors on...

  10. Zagreb Conference on English Contrastive Projects, 7-9 December 1970. Papers and Discussion. Studies 4. The Yugoslav Serbo-Croatian-English Contrastive Project.

    ERIC Educational Resources Information Center

    Filipovic, Rudolf, Ed.

    The fourth volume in this series contains the papers presented at the Zagreb Conference on English Contrastive Projects. They are: "Recent Center Activities in Contrastive Linguistics," by William Nemser; "The Yugoslav Serbo-Croatian-English Contrastive Project So Far," by Rudolf Filipovic; "The Poznan Polish-English Contrastive Project," by Jacek…

  11. Project Senior. Innovations in Educational Programming for the Elderly. A Pilot Project: Thermopolis, Wyoming. [Final Report].

    ERIC Educational Resources Information Center

    Owsley, Jean

    A pilot project, entitled Project Senior, was developed and implemented to provide innovative educational programing for older adults in the small rural setting of Thermopolis, Wyoming. Included among the major project activities were the following: a door-to-door survey of 759 persons over 55 years old to determine those courses most desired by…

  12. Healthy city projects in developing countries: the first evaluation.

    PubMed

    Harpham, T; Burton, S; Blue, I

    2001-06-01

    The 'healthy city' concept has only recently been adopted in developing countries. From 1995 to 1999, the World Health Organization (WHO), Geneva, supported healthy city projects (HCPs) in Cox's Bazar (Bangladesh), Dar es Salaam (Tanzania), Fayoum (Egypt), Managua (Nicaragua) and Quetta (Pakistan). The authors evaluated four of these projects, representing the first major evaluation of HCPs in developing countries. Methods used were stakeholder analysis, workshops, document analysis and interviews with 102 managers/implementers and 103 intended beneficiaries. Municipal health plan development (one of the main components of the healthy city strategy) in these cities was limited, which is a similar finding to evaluations of HCPs in Europe. The main activities selected by the projects were awareness raising and environmental improvements, particularly solid waste disposal. Two of the cities effectively used the 'settings' approach of the healthy city concept, whereby places such as markets and schools are targeted. The evaluation found that stakeholder involvement varied in relation to: (i) the level of knowledge of the project; (ii) the project office location; (iii) the project management structure; and (iv) type of activities (ranging from low stakeholder involvement in capital-intensive infrastructure projects, to high in some settings-type activities). There was evidence to suggest that understanding of environment-health links was increased across stakeholders. There was limited political commitment to the healthy city projects, perhaps due to the fact that most of the municipalities had not requested the projects. Consequently, the projects had little influence on written/expressed municipal policies. Some of the projects mobilized considerable resources, and most projects achieved effective intersectoral collaboration. WHO support enabled the project coordinators to network at national and international levels, and the capacity of these individuals (although not necessarily their institutions) was increased by the project. The average annual running cost of the projects was approximately 132,000 US dollars per city, which is close to the costs of the only other HCP for which a cost analysis has been undertaken, Bangkok (115,000 US dollars per year) Recommendations for these and other HCPs are provided.

  13. Breadth of Scientific Activities and Network Station Specifications in the IGS

    NASA Technical Reports Server (NTRS)

    Moore, A. W.; Springer, T. A.; Reigber, Ch.

    1999-01-01

    This presentation provides a brief overview of the scientific activities of the International GPS Service (IGS). This was an approved activity of the International Association of Geodesy (IAG) with official start of service on 1 Jan 1994. The mission of the IGS is "To provide a service to support geodetic and geophysical research activities, through GPS data and data products." The presentation explains the concept of the IGS working group, and pilot projects, and reviews the current working groups and pilot projects.

  14. Computational Everyday Life Human Behavior Model as Servicable Knowledge

    NASA Astrophysics Data System (ADS)

    Motomura, Yoichi; Nishida, Yoshifumi

    A project called `Open life matrix' is not only a research activity but also real problem solving as an action research. This concept is realized by large-scale data collection, probabilistic causal structure model construction and information service providing using the model. One concrete outcome of this project is childhood injury prevention activity in new team consist of hospital, government, and many varieties of researchers. The main result from the project is a general methodology to apply probabilistic causal structure models as servicable knowledge for action research. In this paper, the summary of this project and future direction to emphasize action research driven by artificial intelligence technology are discussed.

  15. Energy Remote Sensing Applications Projects at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Norman, S. D.; Likens, W. C.; Mouat, D. A.

    1982-01-01

    The NASA Ames Research Center is active in energy projects primarily in the role of providing assistance to users in the solution of a number of problems related to energy. Data bases were produced which can be used, in combination with other sources of information, to solve spatially related energy problems. Six project activities at Ames are described which relate to energy and remote sensing. Two projects involve power demand forecasting and estimations using remote sensing and geographic information systems; two others involve transmission line routing and corridor analysis; one involves a synfuel user needs assessment through remote sensing; and the sixth involves the siting of energy facilities.

  16. Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, W.H.

    1998-03-20

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less

  17. Automated Methodologies for the Design of Flow Diagrams for Development and Maintenance Activities

    NASA Astrophysics Data System (ADS)

    Shivanand M., Handigund; Shweta, Bhat

    The Software Requirements Specification (SRS) of the organization is a text document prepared by strategic management incorporating the requirements of the organization. These requirements of ongoing business/ project development process involve the software tools, the hardware devices, the manual procedures, the application programs and the communication commands. These components are appropriately ordered for achieving the mission of the concerned process both in the project development and the ongoing business processes, in different flow diagrams viz. activity chart, workflow diagram, activity diagram, component diagram and deployment diagram. This paper proposes two generic, automatic methodologies for the design of various flow diagrams of (i) project development activities, (ii) ongoing business process. The methodologies also resolve the ensuing deadlocks in the flow diagrams and determine the critical paths for the activity chart. Though both methodologies are independent, each complements other in authenticating its correctness and completeness.

  18. Evaluation of the impact of the I-66 active traffic management system : final report.

    DOT National Transportation Integrated Search

    2016-09-01

    Construction of a Virginia Department of Transportation project to install an Active Traffic Management (ATM) system on Interstate-66 (I-66) from U.S. 29 in Centreville to the Capital Beltway (I-495) was completed in September 2015. The project was c...

  19. Design and Implementation of a Project-Based Active/Cooperative Engineering Design Course for Freshmen

    ERIC Educational Resources Information Center

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-01-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long…

  20. Matriculation Evaluation: Monographs on Designs from the Local Research Options Project.

    ERIC Educational Resources Information Center

    1992

    In November 1989, nine research designs developed to assist local colleges in the evaluation of their matriculation activities were disseminated to the California community colleges. These designs, created as part of the Local Research Options Project, focused on measuring the effects of the colleges' matriculation activities on student…

  1. Origami: An Active Learning Exercise for Scrum Project Management

    ERIC Educational Resources Information Center

    Sibona, Christopher; Pourreza, Saba; Hill, Stephen

    2018-01-01

    Scrum is a popular project management model for iterative delivery of software that subscribes to Agile principles. This paper describes an origami active learning exercise to teach the principles of Scrum in management information systems courses. The exercise shows students how Agile methods respond to changes in requirements during project…

  2. Mapping International Cancer Activities – Global Cancer Project Map Launch

    Cancer.gov

    CGH’s Dr. Sudha Sivaram, Dr. Makeda Williams, and Ms. Kalina Duncan have partnered with Drs. Ami Bhatt and Franklin Huang at Global Oncology, Inc. (GO) to develop the Global Cancer Project Map - a web-based tool designed to facilitate cancer research and control activity planning.

  3. 24 CFR 58.71 - Request for release of funds and certification.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Certifying Officer. The request shall describe the specific project and activities covered by the request and... entity with all available project and environmental information and refrain from undertaking any physical activities or choice limiting actions until HUD (or the State, if applicable) has approved its request for...

  4. 24 CFR 58.71 - Request for release of funds and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Certifying Officer. The request shall describe the specific project and activities covered by the request and... entity with all available project and environmental information and refrain from undertaking any physical activities or choice limiting actions until HUD (or the State, if applicable) has approved its request for...

  5. Critters: K-6 Life Science Activities. Project AIMS.

    ERIC Educational Resources Information Center

    Allen, Maureen Murphy; And Others

    Project AIMS (Activities to Integrate Mathematics and Science) has as its purpose the integration of subject matter in grades K-9. Field testing of the curriculum materials produced by AIMS indicates that this integration produces the following beneficial results: (1) mathematics becomes more meaningful, hence more useful; (2) science is…

  6. 49 CFR 350.105 - What definitions are used in this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... activities and projects that improve CMV safety and compliance with CMV safety regulations (including activities and projects that are national in scope), increase public awareness and education, demonstrate new technologies, and reduce the number and rate of accidents involving CMVs. Incentive Funds means funds awarded...

  7. 34 CFR 403.160 - What activities does the Secretary support under the Comprehensive Career Guidance and Counseling...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... administered by certified counselors; and (2) Designed to improve, expand, and extend career guidance and... section; (2) Services and activities designed to ensure the quality and effectiveness of career guidance...) Curriculum development; (iv) Research and demonstration projects; (v) Experimental projects; (vi) The...

  8. 34 CFR 403.160 - What activities does the Secretary support under the Comprehensive Career Guidance and Counseling...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... administered by certified counselors; and (2) Designed to improve, expand, and extend career guidance and... section; (2) Services and activities designed to ensure the quality and effectiveness of career guidance...) Curriculum development; (iv) Research and demonstration projects; (v) Experimental projects; (vi) The...

  9. 34 CFR 403.160 - What activities does the Secretary support under the Comprehensive Career Guidance and Counseling...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... administered by certified counselors; and (2) Designed to improve, expand, and extend career guidance and... section; (2) Services and activities designed to ensure the quality and effectiveness of career guidance...) Curriculum development; (iv) Research and demonstration projects; (v) Experimental projects; (vi) The...

  10. 34 CFR 403.160 - What activities does the Secretary support under the Comprehensive Career Guidance and Counseling...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... administered by certified counselors; and (2) Designed to improve, expand, and extend career guidance and... section; (2) Services and activities designed to ensure the quality and effectiveness of career guidance...) Curriculum development; (iv) Research and demonstration projects; (v) Experimental projects; (vi) The...

  11. Illinois Education for Technology Employment Project.

    ERIC Educational Resources Information Center

    Lake County Area Vocational Center, Grayslake, IL.

    Activities and procedures by which secondary vocational education can be designed to prepare students for entrance into new technology programs or employment were developed in the Illinois Employment for Technology Education (ETE) project during the 1983-84 school year. These activities included the following: (1) formation of a high technology…

  12. Ten Projects to Involve Your Students Directly in French.

    ERIC Educational Resources Information Center

    van Lent, Peter C.

    1981-01-01

    Proposes 10 activities to provide French classes of all levels with a broad spectrum of language projects involving direct and active use of French including students polling each other, skits based on television commercials, geographical "show and tell," cooking French dishes, writing a monthly newspaper, and field trips. (BK)

  13. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS... 34 Education 2 2010-07-01 2010-07-01 false What activities may the Secretary fund under community...

  14. 34 CFR 380.6 - What activities may the Secretary fund under technical assistance supported employment projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS... 34 Education 2 2010-07-01 2010-07-01 false What activities may the Secretary fund under technical...

  15. 34 CFR 380.4 - What activities may the Secretary fund under Statewide supported employment demonstration projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS... 34 Education 2 2010-07-01 2010-07-01 false What activities may the Secretary fund under Statewide...

  16. Making a Natural Product Chemistry Course Meaningful with a Mini Project Laboratory

    ERIC Educational Resources Information Center

    Hakim, Aliefman; Liliasari; Kadarohman, Asep; Syah, Yana Maolana

    2016-01-01

    This paper discusses laboratory activities that can improve the meaningfulness of natural product chemistry course. These laboratory activities can be useful for students from many different disciplines including chemistry, pharmacy, and medicine. Students at the third-year undergraduate level of chemistry education undertake the project to…

  17. Dare to Dream: New Venture Incubator for Older Adults

    ERIC Educational Resources Information Center

    Hantman, Shira; Gimmon, Eli

    2014-01-01

    The purpose of this article is to describe a project that aims to foster active aging through entrepreneurial activities among older adults. The project establishes the feasibility of implementing an intervention program that assimilates the concept and capabilities of entrepreneurship among older adults and supports them while launching new…

  18. Promising Practices in Florida: Integrating Academic and Vocational Education.

    ERIC Educational Resources Information Center

    Jones, Betty, Comp.

    This document is a compilation of 90 successful interdisciplinary projects and activities and integrated academic and vocational curriculum ideas implemented in Florida during the past 3 years. The activities and projects have been submitted by teachers and have not been officially evaluated or reviewed. Each description provides this information:…

  19. 78 FR 12033 - Programs and Research Projects Affecting the Arctic

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... ARCTIC RESEARCH COMMISSION Programs and Research Projects Affecting the Arctic Notice is hereby given that the U.S. Arctic Research Commission will hold its 100th meeting in Anchorage and Bethel... presentations concerning Arctic research activities The focus of the meeting will be Arctic research activities...

  20. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  1. A Handbook of Projects and Activities for Marketing and Distributive Education.

    ERIC Educational Resources Information Center

    Montana State Office of the Superintendent of Public Instruction, Helena.

    This handbook has been designed to provide classroom teachers with relevant, ready-to-use materials geared to supplement classroom instruction in marketing and distributive education. The projects/activities have been organized using the major units of instruction of the Montana Curriculum Guidelines for Distributive Education, except for a…

  2. HIGH-DIMENSIONAL PROFILING OF TRANSCRIPTION FACTOR ACTIVITY DIFFERENTIATES TOXCAST CHEMICAL GROUPS

    EPA Science Inventory

    The ToxCast™ project at the U.S. EPA uses a diverse battery of high throughput screening assays and informatics models to rapidly characterize the activity of chemicals. A central goal of the project is to provide empirical evidence to aid in the prioritization of chemicals for a...

  3. 34 CFR 646.4 - What activities and services does a project provide?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., writing, study skills, mathematics, science, and other subjects. (2) Advice and assistance in... 34 Education 3 2011-07-01 2011-07-01 false What activities and services does a project provide? 646.4 Section 646.4 Education Regulations of the Offices of the Department of Education (Continued...

  4. Constructing Meanings and Utilities within Algebraic Tasks

    ERIC Educational Resources Information Center

    Ainley, Janet; Bills, Liz; Wilson, Kirsty

    2004-01-01

    The Purposeful Algebraic Activity project aims to explore the potential of spreadsheets in the introduction to algebra and algebraic thinking. We discuss two sub-themes within the project: tracing the development of pupils' construction of meaning for variable from arithmetic-based activity, through use of spreadsheets, and into formal algebra,…

  5. Earthquake Model of the Middle East (EMME) Project: Active Fault Database for the Middle East Region

    NASA Astrophysics Data System (ADS)

    Gülen, L.; Wp2 Team

    2010-12-01

    The Earthquake Model of the Middle East (EMME) Project is a regional project of the umbrella GEM (Global Earthquake Model) project (http://www.emme-gem.org/). EMME project region includes Turkey, Georgia, Armenia, Azerbaijan, Syria, Lebanon, Jordan, Iran, Pakistan, and Afghanistan. Both EMME and SHARE projects overlap and Turkey becomes a bridge connecting the two projects. The Middle East region is tectonically and seismically very active part of the Alpine-Himalayan orogenic belt. Many major earthquakes have occurred in this region over the years causing casualties in the millions. The EMME project will use PSHA approach and the existing source models will be revised or modified by the incorporation of newly acquired data. More importantly the most distinguishing aspect of the EMME project from the previous ones will be its dynamic character. This very important characteristic is accomplished by the design of a flexible and scalable database that will permit continuous update, refinement, and analysis. A digital active fault map of the Middle East region is under construction in ArcGIS format. We are developing a database of fault parameters for active faults that are capable of generating earthquakes above a threshold magnitude of Mw≥5.5. Similar to the WGCEP-2007 and UCERF-2 projects, the EMME project database includes information on the geometry and rates of movement of faults in a “Fault Section Database”. The “Fault Section” concept has a physical significance, in that if one or more fault parameters change, a new fault section is defined along a fault zone. So far over 3,000 Fault Sections have been defined and parameterized for the Middle East region. A separate “Paleo-Sites Database” includes information on the timing and amounts of fault displacement for major fault zones. A digital reference library that includes the pdf files of the relevant papers, reports is also being prepared. Another task of the WP-2 of the EMME project is to prepare a strain and slip rate map of the Middle East region by basically compiling already published data. The third task is to calculate b-values, Mmax and determine the activity rates. New data and evidences will be interpreted to revise or modify the existing source models. A logic tree approach will be utilized for the areas where there is no consensus to encompass different interpretations. Finally seismic source zones in the Middle East region will be delineated using all available data. EMME Project WP2 Team: Levent Gülen, Murat Utkucu, M. Dinçer Köksal, Hilal Domaç, Yigit Ince, Mine Demircioglu, Shota Adamia, Nino Sandradze, Aleksandre Gvencadze, Arkadi Karakhanyan, Mher Avanesyan, Tahir Mammadli, Gurban Yetirmishli, Arif Axundov, Khaled Hessami, M. Asif Khan, M. Sayab.

  6. An Evaluation of the Productivity Enhancing Capital Investment Process at the Shore Intermediate Maintenance Activity Little Creek, Virginia.

    DTIC Science & Technology

    1985-12-01

    PECI program sets aside funds in the annual budget and makes them available to managers and personnel for a 10 %[ wide range of cost and labor- saving ... money to fund PECI projects of particular concern to the individual services. [Ref. 4:pp. 3-4] The OSD-sponsored projects include two programs that... money is used by Navy non-industrial funded activities. Although - the line item amount is approved by Congress, individual project approval is the

  7. Ural-Tweed Bighorn Sheep Wildlife Mitigation Project, 1984-1990 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Lewis R.; Yde, Chris A.

    The results of habitat improvement project activities accomplished under contract No.84-38 for bighorn sheep mitigation along Koocanusa Reservoir from September 1, 1984, through June 30, 1990, are reported here. Habitat treatments were applied to ten areas and covered 1100 acres. Treatments used were prescribed fire, slashing combined with prescribed fire, and fertilization. Several variations in season or intensity were used within the slashing and prescribed fire treatments. This project was coordinated with and complemented concurrent Kootenai National Forest habitat improvement activities.

  8. Quarterly report for the NGA FFCA project, April 1, 1994--June 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    Summaries of activities and agendas of meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project are presented. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities included collection and review of state work plans, coordination with the National Association of Attorneys General to identify areas of overlap in working on DOE issues related to environmental management, and the writing of task force meeting summaries for distribution.

  9. Operational research within a Global Fund supported tuberculosis project in India: why, how and its contribution towards change in policy and practice

    PubMed Central

    Sagili, Karuna D; Satyanarayana, Srinath; Chadha, Sarabjit S; Wilson, Nevin C; Kumar, Ajay M V; Oeltmann, John E; Chadha, Vineet K; Nagaraja, Sharath Burugina; Ghosh, Smita; Q Lo, Terrence; Volkmann, Tyson; Willis, Matthew; Shringarpure, Kalpita; Reddy, Ravichandra Chinnappa; Kumar, Prahlad; Nair, Sreenivas A; Rao, Raghuram; Yassin, Mohammed; Mwangala, Perry; Zachariah, Rony; Tonsing, Jamhoih; Harries, Anthony D; Khaparde, Sunil

    2018-01-01

    ABSTRACT Background: The Global Fund encourages operational research (OR) in all its grants; however very few reports describe this aspect. In India, Project Axshya was supported by a Global Fund grant to improve the reach and visibility of the government Tuberculosis (TB) services among marginalised and vulnerable communities. OR was incorporated to build research capacity of professionals working with the national TB programme and to generate evidence to inform policies and practices. Objectives: To describe how Project Axshya facilitated building OR capacity within the country, helped in addressing several TB control priority research questions, documented project activities and their outcomes, and influenced policy and practice. Methods: From September 2010 to September 2016, three key OR-related activities were implemented. First, practical output-oriented modular training courses were conducted (n = 3) to build research capacity of personnel involved in the TB programme, co-facilitated by The Union, in collaboration with the national TB programme, WHO country office and CDC, Atlanta. Second, two large-scale Knowledge, Attitude and Practice (KAP) surveys were conducted at baseline and mid-project to assess the changes pertaining to TB knowledge, attitudes and practices among the general population, TB patients and health care providers over the project period. Third, studies were conducted to describe the project’s core activities and outcomes. Results: In the training courses, 44 participant teams were supported to develop research protocols on topics of national priority, resulting in 28 peer-reviewed scientific publications. The KAP surveys and description of project activities resulted in 14 peer-reviewed publications. Of the published papers at least 12 have influenced change in policy or practice. Conclusions: OR within a Global Fund supported TB project has resulted in building OR capacity, facilitating research in areas of national priority and influencing policy and practice. We believe this experience will provide guidance for undertaking OR in Global Fund projects. PMID:29553308

  10. The diversity and evolution of ecological and environmental citizen science

    PubMed Central

    Tweddle, John C.; Savage, Joanna; Robinson, Lucy D.; Roy, Helen E.

    2017-01-01

    Citizen science—the involvement of volunteers in data collection, analysis and interpretation—simultaneously supports research and public engagement with science, and its profile is rapidly rising. Citizen science represents a diverse range of approaches, but until now this diversity has not been quantitatively explored. We conducted a systematic internet search and discovered 509 environmental and ecological citizen science projects. We scored each project for 32 attributes based on publicly obtainable information and used multiple factor analysis to summarise this variation to assess citizen science approaches. We found that projects varied according to their methodological approach from ‘mass participation’ (e.g. easy participation by anyone anywhere) to ‘systematic monitoring’ (e.g. trained volunteers repeatedly sampling at specific locations). They also varied in complexity from approaches that are ‘simple’ to those that are ‘elaborate’ (e.g. provide lots of support to gather rich, detailed datasets). There was a separate cluster of entirely computer-based projects but, in general, we found that the range of citizen science projects in ecology and the environment showed continuous variation and cannot be neatly categorised into distinct types of activity. While the diversity of projects begun in each time period (pre 1990, 1990–99, 2000–09 and 2010–13) has not increased, we found that projects tended to have become increasingly different from each other as time progressed (possibly due to changing opportunities, including technological innovation). Most projects were still active so consequently we found that the overall diversity of active projects (available for participation) increased as time progressed. Overall, understanding the landscape of citizen science in ecology and the environment (and its change over time) is valuable because it informs the comparative evaluation of the ‘success’ of different citizen science approaches. Comparative evaluation provides an evidence-base to inform the future development of citizen science activities. PMID:28369087

  11. First Little Bank: An Economics Project in First Grade.

    ERIC Educational Resources Information Center

    Wamester, Pamela Ricci

    1995-01-01

    Describes a class banking project whereby students deposited their ice cream money, received a more nutritious snack as interest, and saved enough to buy books. Includes activities across the curriculum related to the banking project. (HTH)

  12. Quantifying economic benefits for rail infrastructure projects.

    DOT National Transportation Integrated Search

    2014-10-01

    This project identifies metrics for measuring the benefit of rail infrastructure projects for key : stakeholders. It is important that stakeholders with an interest in community economic development play an active : role in the development of the rai...

  13. 34 CFR 426.4 - What activities does the Secretary fund under the Demonstration Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Individuals who participate in programs designed to eliminate sex bias; (5) Individuals in correctional... Secretary determines to be necessary for the successful completion of the project. (c) Projects to overcome...

  14. 76 FR 23850 - Agency Information Collection Activities: Approval of a Revision in Information Collection(s...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... successes and/or the influence of external factors on Project expectations. Including an ex post examination... narrative discussion detailing project successes and/or the influence of external factors on project...

  15. Hanford analytical sample projections FY 1998--FY 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management,more » and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.« less

  16. A mixed reality approach for stereo-tomographic quantification of lung nodules.

    PubMed

    Chen, Mianyi; Kalra, Mannudeep K; Yun, Wenbing; Cong, Wenxiang; Yang, Qingsong; Nguyen, Terry; Wei, Biao; Wang, Ge

    2016-05-25

    To reduce the radiation dose and the equipment cost associated with lung CT screening, in this paper we propose a mixed reality based nodule measurement method with an active shutter stereo imaging system. Without involving hundreds of projection views and subsequent image reconstruction, we generated two projections of an iteratively placed ellipsoidal volume in the field of view and merging these synthetic projections with two original CT projections. We then demonstrated the feasibility of measuring the position and size of a nodule by observing whether projections of an ellipsoidal volume and the nodule are overlapped from a human observer's visual perception through the active shutter 3D vision glasses. The average errors of measured nodule parameters are less than 1 mm in the simulated experiment with 8 viewers. Hence, it could measure real nodules accurately in the experiments with physically measured projections.

  17. Out of Class--Out of Mind? The Use of a Virtual Learning Environment to Encourage Student Engagement in Out of Class Activities

    ERIC Educational Resources Information Center

    Leese, Maggie

    2009-01-01

    With increasing student numbers and a diverse student body, it is crucial to consider a range of methods to engage students in learning and teaching activities. This project was used to encourage 1st-year undergraduate students to engage in out of class activities between taught sessions. The project used a virtual learning environment (VLE) known…

  18. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    PubMed

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  19. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    PubMed Central

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  20. Developing integrated methods to address complex resource and environmental issues

    USGS Publications Warehouse

    Smith, Kathleen S.; Phillips, Jeffrey D.; McCafferty, Anne E.; Clark, Roger N.

    2016-02-08

    IntroductionThis circular provides an overview of selected activities that were conducted within the U.S. Geological Survey (USGS) Integrated Methods Development Project, an interdisciplinary project designed to develop new tools and conduct innovative research requiring integration of geologic, geophysical, geochemical, and remote-sensing expertise. The project was supported by the USGS Mineral Resources Program, and its products and acquired capabilities have broad applications to missions throughout the USGS and beyond.In addressing challenges associated with understanding the location, quantity, and quality of mineral resources, and in investigating the potential environmental consequences of resource development, a number of field and laboratory capabilities and interpretative methodologies evolved from the project that have applications to traditional resource studies as well as to studies related to ecosystem health, human health, disaster and hazard assessment, and planetary science. New or improved tools and research findings developed within the project have been applied to other projects and activities. Specifically, geophysical equipment and techniques have been applied to a variety of traditional and nontraditional mineral- and energy-resource studies, military applications, environmental investigations, and applied research activities that involve climate change, mapping techniques, and monitoring capabilities. Diverse applied geochemistry activities provide a process-level understanding of the mobility, chemical speciation, and bioavailability of elements, particularly metals and metalloids, in a variety of environmental settings. Imaging spectroscopy capabilities maintained and developed within the project have been applied to traditional resource studies as well as to studies related to ecosystem health, human health, disaster assessment, and planetary science. Brief descriptions of capabilities and laboratory facilities and summaries of some applications of project products and research findings are included in this circular. The work helped support the USGS mission to “provide reliable scientific information to describe and understand the Earth; minimize loss of life and property from natural disasters; manage water, biological, energy, and mineral resources; and enhance and protect our quality of life.” Activities within the project include the following:Spanned scales from microscopic to planetary;Demonstrated broad applications across disciplines;Included life-cycle studies of mineral resources;Incorporated specialized areas of expertise in applied geochemistry including mineralogy, hydrogeology, analytical chemistry, aqueous geochemistry, biogeochemistry, microbiology, aquatic toxicology, and public health; andIncorporated specialized areas of expertise in geophysics including magnetics, gravity, radiometrics, electromagnetics, seismic, ground-penetrating radar, borehole radar, and imaging spectroscopy.This circular consists of eight sections that contain summaries of various activities under the project. The eight sections are listed below:Laboratory Facilities and Capabilities, which includes brief descriptions of the various types of laboratories and capabilities used for the project;Method and Software Development, which includes summaries of remote-sensing, geophysical, and mineralogical methods developed or enhanced by the project;Instrument Development, which includes descriptions of geophysical instruments developed under the project;Minerals, Energy, and Climate, which includes summaries of research that applies to mineral or energy resources, environmental processes and monitoring, and carbon sequestration by earth materials;Element Cycling, Toxicity, and Health, which includes summaries of several process-oriented geochemical and biogeochemical studies and health-related research activities;Hydrogeology and Water Quality, which includes descriptions of innovative geophysical, remote-sensing, and geochemical research pertaining to hydrogeology and water-quality applications;Hazards and Disaster Assessment, which includes summaries of research and method development that were applied to natural hazards, human-caused hazards, and disaster assessments; andDatabases and Framework Studies, which includes descriptions of fundamental applications of geophysical studies and of the importance of archived data.

  1. From Surveillance to Intervention: Overview and Baseline Findings for the Active City of Liverpool Active Schools and SportsLinx (A-CLASS) Project

    PubMed Central

    McWhannell, Nicola; Henaghan, Jayne L.

    2018-01-01

    This paper outlines the implementation of a programme of work that started with the development of a population-level children’s health, fitness and lifestyle study in 1996 (SportsLinx) leading to selected interventions one of which is described in detail: the Active City of Liverpool, Active Schools and SportsLinx (A-CLASS) Project. The A-CLASS Project aimed to quantify the effectiveness of structured and unstructured physical activity (PA) programmes on children’s PA, fitness, body composition, bone health, cardiac and vascular structures, fundamental movement skills, physical self-perception and self-esteem. The study was a four-arm parallel-group school-based cluster randomised controlled trial (clinical trials no. NCT02963805), and compared different exposure groups: a high intensity PA (HIPA) group, a fundamental movement skill (FMS) group, a PA signposting (PASS) group and a control group, in a two-schools-per-condition design. Baseline findings indicate that children’s fundamental movement skill competence levels are low-to-moderate, yet these skills are inversely associated with percentage body fat. Outcomes of this project will make an important contribution to the design and implementation of children’s PA promotion initiatives.

  2. Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)

    NASA Astrophysics Data System (ADS)

    Selvy, Brian M.; Claver, Charles; Angeli, George

    2014-08-01

    This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project's needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.

  3. Project Leadership Lived Experiences with Web-Based Social Networking: A Phenomenological Study

    ERIC Educational Resources Information Center

    Scroggins, Charles W.

    2010-01-01

    This study explores the lived experiences of project leaders adopting and using Web-2.0 social networking collaboration applications for their project leadership activities. The experiences of 20 project leaders in a Fortune 500 aerospace and defense enterprise in the northeastern United States of America were explored using a qualitative…

  4. Riparian forest restoration: Conflicting goals, trade-offs, and measures of success

    Treesearch

    Heather L. Bateman; David M. Merritt; J. Bradley Johnson

    2012-01-01

    Restoration projects can have varying goals, depending on the specific focus, rationale, and aims for restoration. When restoration projects use project-specific goals to define activities and gauge success without considering broader ecological context, determination of project implications and success can be confounding. We used case studies from the Middle Rio...

  5. Migrant Education Projects. Projectos de Educacion Migrante. Oregon Migrant Education.

    ERIC Educational Resources Information Center

    Oregon State Dept. of Education, Salem.

    Written in both English and Spanish, this booklet briefly summarizes the general concepts and requirements behind Title I Migrant activities for use by project personnel, parents, and others interested in those projects. After a brief discussion of project funding and definitions of commonly used terms, there is an outline of requirements which…

  6. SELF (Supports for Early Learning Foundations): A Non-Directed Model Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes achievements and activities of Project SELF (Supports for Early Learning Foundations), a federally funded project in New Mexico which developed, evaluated, and replicated an innovative model that provides strategies for early interventionists and families to support early learning foundations. The project identified…

  7. Pacific Basin Deaf-Blind Project. State & Multi State Projects for Children with Deaf-Blindness. Final Report, 1992-1995.

    ERIC Educational Resources Information Center

    Kelly, Dotty; Guerrero, Vincent Leon

    This final report describes activities and accomplishments of the Pacific Basin Deaf-Blind Project, a 3-year federally funded project to provide technical assistance to public and private agencies, institutions, and organizations providing early intervention, educational, transitional, vocational, early identification, and related services to…

  8. The Northeast Ghana Savannah Project--A Case Study in Project Design.

    ERIC Educational Resources Information Center

    Matlock, W. Gerald; Johnson, Jack D.

    This report examines a project design for land degradation problems in the northern and upper regions of Ghana. The project was jointly sponsored by the Ghana Council for Scientific and Industrial Research and the Agency for International Development. The council is responsible for coordinating the activities of 10 independent research institutes.…

  9. QA Activities on Two Large RARE Projects at the US EPA, RTP, NC ─ from Fish to Humans

    EPA Science Inventory

    Two RARE (Regional Applied Research Effort) projects are being managed by Janet Diliberto, Linda Birnbaum, and Thomas Hughes. Janet is the Project Officer, Linda is the science advisor and Thomas is the QA and Records Manager for these two RARE projects. These are high visibili...

  10. THe Case Method of Instruction (CMI) Project. Final Report.

    ERIC Educational Resources Information Center

    McWilliam, P. J.; And Others

    This final report describes the Case Method of Instruction (CMI) Project, a project to develop, field test, and disseminate training materials to facilitate the use of the Case Method of Instruction by inservice and preservice instructors in developmental disabilities. CMI project activities focused on developing a collection of case stories and…

  11. Low-cost solar array project and Proceedings of the 14th Project Integration Meeting

    NASA Technical Reports Server (NTRS)

    Mcdonald, R. R.

    1980-01-01

    Activities are reported on the following areas: project analysis and integration; technology development in silicon material, large area sheet silicon, and encapsulation; production process and equipment development; and engineering and operations, and the steps taken to integrate these efforts. Visual materials presented at the project Integration Meeting are included.

  12. 34 CFR 371.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized under this... REHABILITATION SERVICE PROJECTS FOR AMERICAN INDIANS WITH DISABILITIES What Kinds of Activities Does the Department of Education Assist Under This Program? § 371.10 What types of projects are authorized under this...

  13. Final Evaluation Report for Minneapolis Health and Nutrition Project.

    ERIC Educational Resources Information Center

    Guardian Resource Development, Inc., St. Paul, Minn.

    The social, mental and physical health of children in target Minneapolis Schools has been carefully studied. The intent of this project was to design and implement a program which would improve health. This report discusses the progress of the project for the first year. The project's activities centered around planning, needs assessment and…

  14. 77 FR 74517 - Agency Information Collection Activities: Comment Request; Education and Human Resources Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... descriptive information gathered from education and training projects that are funded by NSF. NSF will... categories of descriptive data: (1) Staff and project participants (data that are also necessary to determine... scientific experts, a census rather than sampling design typically is necessary. At the individual project...

  15. 34 CFR 369.46 - What are the special requirements pertaining to the protection, use, and release of personal...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF EDUCATION VOCATIONAL REHABILITATION SERVICE PROJECTS What Conditions Must Be Met by a Grantee... connected with the project, including project evaluation activities. This information may not be disclosed... information? (a) All personal information about individuals served by any project under this part, including...

  16. 40 CFR 46.195 - Project period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project period. 46.195 Section 46.195... During the Fellowship § 46.195 Project period. Based on the “Date Fellow Will Enter on Duty” which you enter on the Activation Notice (see § 46.185(a)), EPA will establish the project period for the...

  17. Showcase 80: Projects of Excellence in New York State Postsecondary Occupational Education.

    ERIC Educational Resources Information Center

    State Univ. of New York, Albany. Two Year Coll. Student Development Center.

    Fifteen two-year college, vocational education projects are described, which, in the opinion of New York's Showcase of Excellence Program judges, are worthy of adaptation or replication by other institutions. For each of the projects which were selected from 83 nominations, objectives, activities, project impact, and personnel and material…

  18. 40 CFR 46.195 - Project period.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project period. 46.195 Section 46.195... During the Fellowship § 46.195 Project period. Based on the “Date Fellow Will Enter on Duty” which you enter on the Activation Notice (see § 46.185(a)), EPA will establish the project period for the...

  19. 40 CFR 46.195 - Project period.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project period. 46.195 Section 46.195... During the Fellowship § 46.195 Project period. Based on the “Date Fellow Will Enter on Duty” which you enter on the Activation Notice (see § 46.185(a)), EPA will establish the project period for the...

  20. 40 CFR 46.195 - Project period.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project period. 46.195 Section 46.195... During the Fellowship § 46.195 Project period. Based on the “Date Fellow Will Enter on Duty” which you enter on the Activation Notice (see § 46.185(a)), EPA will establish the project period for the...

  1. 40 CFR 46.195 - Project period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project period. 46.195 Section 46.195... During the Fellowship § 46.195 Project period. Based on the “Date Fellow Will Enter on Duty” which you enter on the Activation Notice (see § 46.185(a)), EPA will establish the project period for the...

  2. Neural Correlates of the False Consensus Effect: Evidence for Motivated Projection and Regulatory Restraint.

    PubMed

    Welborn, B Locke; Gunter, Benjamin C; Vezich, I Stephanie; Lieberman, Matthew D

    2017-04-01

    The false consensus effect (FCE), the tendency to project our attitudes and opinions on to others, is a pervasive bias in social reasoning with a range of ramifications for individuals and society. Research in social psychology has suggested that numerous factors (anchoring and adjustment, accessibility, motivated projection, etc.) may contribute to the FCE. In this study, we examine the neural correlates of the FCE and provide evidence that motivated projection plays a significant role. Activity in reward regions (ventromedial pFC and bilateral nucleus accumbens) during consensus estimation was positively associated with bias, whereas activity in right ventrolateral pFC (implicated in emotion regulation) was inversely associated with bias. Activity in reward and regulatory regions accounted for half of the total variation in consensus bias across participants (R 2 = .503). This research complements models of the FCE in social psychology, providing a glimpse into the neural mechanisms underlying this important phenomenon.

  3. ACFA 2020 - An FP7 project on active control of flexible fuel efficient aircraft configurations

    NASA Astrophysics Data System (ADS)

    Maier, R.

    2013-12-01

    This paper gives an overview about the project ACFA 2020 which is funded by the European Commission within the 7th framework program. The acronym ACFA 2020 stands for Active Control for Flexible Aircraft 2020. The project is dealing with the design of highly fuel efficient aircraft configurations and, in particular, on innovative active control concepts with the goal to reduce loads and structural weight. Major focus lays on blended wing body (BWB) aircraft. Blended wing body type aircraft configurations are seen as the most promising future concept to fulfill the so-called ACARE (Advisory Council for Aeronautics Research in Europe) vision 2020 goals in regards to reduce fuel consumption and external noise. The paper discusses in some detail the overall goals and how they are addressed in the workplan. Furthermore, the major achievements of the project are outlined and a short outlook on the remaining work is given.

  4. A GABAergic nigrotectal pathway for coordination of drinking behavior

    PubMed Central

    Rossi, Mark A.; Li, Haofang E.; Lu, Dongye; Kim, Il Hwan; Bartholomew, Ryan A.; Gaidis, Erin; Barter, Joseph W.; Kim, Namsoo; Cai, Min Tong; Soderling, Scott H.; Yin, Henry H.

    2016-01-01

    The contribution of basal ganglia outputs to consummatory behavior remains poorly understood. We recorded from the substantia nigra pars reticulata (SNR), the major basal ganglia output nucleus, during self-initiated drinking. The firing rates of many lateral SNR neurons were time-locked to individual licks. These neurons send GABAergic projections to the deep layers of the orofacial region of the lateral tectum (superior colliculus, SC). Many tectal neurons are also time-locked to licking, but their activity is usually antiphase to that of SNR neurons, suggesting inhibitory nigrotectal projections. We used optogenetics to selectively activate the GABAergic nigrotectal afferents in the deep layers of the SC. Photo-stimulation of the nigrotectal projections transiently inhibited the activity of the lick-related tectal neurons, disrupted their licking-related oscillatory pattern, and suppressed self-initiated drinking. These results demonstrate that GABAergic nigrotectal projections play a crucial role in coordinating drinking behavior. PMID:27043290

  5. Rigor + Results = Impact: Measuring Impact with Integrity (Invited)

    NASA Astrophysics Data System (ADS)

    Davis, H. B.; Scalice, D.

    2013-12-01

    Are you struggling to measure and explain the impact of your EPO efforts? The NASA Astrobiology Institute (NAI) is using an evaluation process to determine the impact of its 15 EPO projects with over 200 activities. What is the current impact? How can it be improved in the future? We have developed a process that preserves autonomy at the project implementation level while still painting a picture of the entire portfolio. The impact evaluation process looks at an education/public outreach activity through its entire project cycle. Working with an external evaluator, education leads: 1) rate the quality/health of an activity in each stage of its cycle, and 2) determine the impact based on the results of the evaluation and the rigor of the methods used. The process has created a way to systematically codify a project's health and its impact, while offering support for improving both impact and how it is measured.

  6. Deformation measurement for a rotating deformable lap based on inverse fringe projection

    NASA Astrophysics Data System (ADS)

    Liao, Min; Zhang, Qican

    2015-03-01

    The active deformable lap (also namely stressed lap) is an efficient polishing tool in optical manufacturing. To measure the dynamic deformation caused by outside force on a deformable lap is important and helpful to the opticians to ensure the performance of a deformable lap as expected. In this paper, a manual deformable lap was designed to simulate the dynamic deformation of an active stressed lap, and a measurement system was developed based on inverse projected fringe technique to restore the 3D shape. A redesigned inverse fringe has been projected onto the surface of the measured lap, and the deformations of the tested lap become much obvious and can be easily and quickly evaluated by Fourier fringe analysis. Compared with the conventional projection, this technique is more obvious, and it should be a promising one in the deformation measurement of the active stressed lap in optical manufacturing.

  7. Application of expert systems in project management decision aiding

    NASA Technical Reports Server (NTRS)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  8. A Study of Four Library Programs for Disadvantaged Persons. Part II, Appendices B: Brooklyn Public Library Community Coordinator Project, the New York Public Library North Manhattan Project.

    ERIC Educational Resources Information Center

    Winsor, Charlotte B.; Burrows, Lodema

    This document contains observations of library staff and interviews with community members about the Brooklyn Public Library Community Coordinator Project and the New York Public Library North Manhattan Project. The Community Coordinator Project employs four professional librarians to take an active part in community institutions and organizations…

  9. Students as Water Monitoring Experts--New Forms of Environmental Learning in the 'Schools for a Living River Elbe' Project.

    ERIC Educational Resources Information Center

    Bosler, Ulrich; Lehmann, Jurgen

    2001-01-01

    Describes the cross-national educational network, Schools for a Living River Elbe. The project is thought to be the largest educational water-quality project in the world. The establishment of the project and the results of an initial survey show that the project is in a position to develop instructional and ecologically stimulating activities.…

  10. Measuring the payback of research activities: a feasible ex-post evaluation methodology in epidemiology and public health.

    PubMed

    Aymerich, Marta; Carrion, Carme; Gallo, Pedro; Garcia, Maria; López-Bermejo, Abel; Quesada, Miquel; Ramos, Rafel

    2012-08-01

    Most ex-post evaluations of research funding programs are based on bibliometric methods and, although this approach has been widely used, it only examines one facet of the project's impact, that is, scientific productivity. More comprehensive models of payback assessment of research activities are designed for large-scale projects with extensive funding. The purpose of this study was to design and implement a methodology for the ex-post evaluation of small-scale projects that would take into account both the fulfillment of projects' stated objectives as well as other wider benefits to society as payback measures. We used a two-phase ex-post approach to appraise impact for 173 small-scale projects funded in 2007 and 2008 by a Spanish network center for research in epidemiology and public health. In the internal phase we used a questionnaire to query the principal investigator (PI) on the outcomes as well as actual and potential impact of each project; in the external phase we sent a second questionnaire to external reviewers with the aim of assessing (by peer-review) the performance of each individual project. Overall, 43% of the projects were rated as having completed their objectives "totally", and 40% "considerably". The research activities funded were reported by PIs as socially beneficial their greatest impact being on research capacity (50% of payback to society) and on knowledge translation (above 11%). The method proposed showed a good discriminating ability that makes it possible to measure, reliably, the extent to which a project's objectives were met as well as the degree to which the project contributed to enhance the group's scientific performance and of its social payback. Copyright © 2012 Elsevier Ltd. All rights reserved.

  11. Training outreach workers for AIDS prevention in rural India: is it sustainable?

    PubMed

    Sivaram, S; Celentano, D D

    2003-12-01

    Through a process of community diagnosis and participation, a non-governmental organization in rural Karnataka state in India selected and trained peer outreach workers to implement and sustain AIDS prevention education activities. This activity was part of a larger AIDS education project that aimed at creating awareness and promoting risk-reducing behaviours in the community. This paper describes efforts of the project to identify and train peer educators during its implementation phase and discusses strategies used to facilitate sustainability. We evaluate the impact of these efforts by conducting an analysis in the project area 2 years after the end of the project. The findings reveal generalized interest among rural communities in HIV prevention issues. The project originally conducted an extensive survey to understand community organization and composition, which helped to identify potential partners and peer educators. Training peer educators was a multi-step process, and one with high attrition. While individual peer educators were an excellent resource during the life of the project, peer educators affiliated with village level institutions had the interest, access to resources and willingness to sustain project efforts. However, the sustainability of their efforts was associated with the quality of interactions with the project implementation team, the strength and leadership of their own institutions, the perceived benefits of implementing AIDS education activities after project life and the gender of the outreach worker. Non-sustainers did not have an organizational structure to backstop their work, were often poor and unemployed persons who later found gainful employment, and overwhelmingly, were female. We present a conceptual model based on these findings to help future projects plan for and achieve sustainability.

  12. Active pulmonary tuberculosis case detection and treatment among floating population in China: an effective pilot.

    PubMed

    Li, Xinxu; Zhang, Hui; Jiang, Shiwen; Wang, Jia; Liu, Xiaoqiu; Li, Weibin; Yao, Hongyan; Wang, Lixia

    2010-12-01

    China has more and more floating population because of reform and opening-up. As one of the high burden countries in tuberculosis (TB) control in the world, China has to face more challenges about the TB case detection and treatment among floating population in China. Aim to evaluate the effect of case detection and treatment of the Floating Population TB Control Pilot Project from Global Fund Round Five (GFR5) TB Control Program in China. During October 2006 to September 2008, the pilot project was implemented gradually in 60 counties in Tianjin, Shanghai, Jiangsu, Zhejiang, Fujian, Shandong and Guangdong. All quarterly reports of the pilot project were collected, and these materials were summarized and analyzed. In seven coastal provinces, 19,584 active pulmonary TB (PTB) cases were registered among floating population in 2 years. Among the active PTB cases, 87.2% were 15-45 years old, and 62.8% were male. In second year, 15,629 active PTB cases were registered, and the overall registration rate was 68 per 100,000 people. DOT treatments were provided for 18,125 active PTB cases in 2 years, and overall DOT treatment rate was 92.6%. There were 3,955 active PTB cases registered in first year, and the overall cure rate was 86.0%. Through the implementation of the pilot project, the TB case detection and treatment among floating population have been enhanced in pilot areas of China. The useful experience and results from the pilot project have been being gradually generalized nationally.

  13. [Active ageing and quality of life--Results of a WHO demonstration project].

    PubMed

    von dem Knesebeck, O; David, K; Bill, P; Hikl, R

    2006-04-01

    Based on the Active Ageing Programme of the World Health Organization (WHO), a demonstration project was conducted in a city in North-Rhine Westphalia between October 2002 and December 2004. The aim of the study was to promote an active ageing process, to maintain autonomy and independence among older people, and thereby to promote health and quality of life. The target group included people aged 55 to 80 years. The aim was to include older persons in a critical period of life due to loss of partner within the last five years and people undergoing a status change due to retirement within the last two years. 344 participants were visited at home to assess their health and psychosocial situation and to identify opportunities for activities. Participants were supported in their efforts to realise the agreed-upon activities. In this article results of the external evaluation are presented. It is analysed whether quality of life according to the WHOQOL Bref improves among participants in the course of the project. Results of non-parametric tests show small differences in quality of life between the three waves of interviews (at the beginning of the project, after one year, at the end of the project). This holds true when only those participants are analysed who retired within the last two years. However, quality of life significantly improves among older persons who lost their partner within the last five years. In terms of implementation of the WHO Active Ageing Programme results suggest application of a risk group strategy.

  14. Isn't Citizen Science a Hoot? A Case-study Exploring the Effectiveness of Citizen Science As an Instrument to Teach the Nature of Science through a Local Nocturnal Owl-monitoring Project

    NASA Astrophysics Data System (ADS)

    Kreofsky, Tess Marie

    Citizen science projects present a distinctive opportunity for professional and volunteer scientists to coordinate their efforts to gather unique sets of data that can benefit the scientific and local communities. These projects are assumed to be an effective educational tool to teach nature of science (NOS) to participants (Brossard, Lewenstein, Bonney, 2005). This case study evaluates the effectiveness of participation in a citizen science project as a way to learn about NOS. Through enhancement of the Tryon Creek Owl Monitoring Project the researcher reviewed the characteristics of a citizen science project that were thought to be necessary to impact the volunteers' knowledge of NOS. The study also explored the benefits and limitations to organizing the citizen science protect using the principles of action research. Analysis of participants' knowledge and the effectiveness of active research theory, was evaluated through pre- and post- questionnaires and interviews. Although volunteers were able to explore the core themes of NOS through actively engaging in the scientific process, they did not experience a statistically significant change in their demonstration of understanding. For a multitude of reasons, participants had a positive experience with the presence of an embedded researcher within the project. This case study supports the use of active research as a guide to ensure that within each project the needs of both the scientific community and the volunteer scientists are met.

  15. Children and their 4-H animal projects: How children use science in agricultural activity

    NASA Astrophysics Data System (ADS)

    Emo, Kenneth Roy

    Many children are introduced to science through informal educational programs. 4-H, an educational youth program, has a history of introducing scientific practices into agriculture. The purpose of this ethnographically-driven case study is to examine how science informs the actions of children raising market animals in a 4-H project. For two years the researcher collected data on 4-H children with market animal projects. Observations, interviews, and artifacts gathered are interpreted using the framework of activity theory. This study provides evidence for how the context of an activity system influences individual actions. Rules developed by the organization guide the actions of children to incorporate physical and psychological tools of science into their project to achieve the object: producing animals of proper weight and quality to be competitive in the county fair. Children learn the necessary actions from a community of practitioners through which expertise is distributed. Children's learning is demonstrated by the way their participation in their project changes with time, from receiving assistance from others to developing expertise in which they provide assistance to others. The strength of this educational experience is how children apply specific tools of science in ways that provide meaning and relevancy to their 4-H activity.

  16. [Current Research Activities on Person-Centered Medicine in Academic Institutes of General Practice in Germany and Austria].

    PubMed

    Weber, Annemarie; Schelling, Jörg; Kohls, Niko; van Dyck, Marcus; Poggenburg, Stephanie; Vajda, Christian; Hirsch, Jameson; Sirois, Fuschia; Toussaint, Loren; Offenbächer, Martin

    2017-10-11

    Aim of study Person-centered medicine (PCM) with its focus on humanistic-biographical-oriented medicine and integrated, positive-salutogenic health is a central aspect in the patient-physician relationship in general practice. The objective of this analysis is to assess the prevalence and type of research project in academic institutions of general practice in Germany (Ger) and Austria (At) and the thematic priorities of the projects in the areas PCM, health promotion (HP), prevention (PRE) and conventional medicine (CM). Methods A search was conducted (September-December 2015) on the websites of 30 institutes and divisions of general medicine for their current research projects. The retrieved projects were assigned to five categories: PCM, HP, PRE, CM and others. Subsequently, we identified the targeted patient groups of the projects as well as the thematic focus in the categories PCM, HP, PRE and CM with focus on PCM and HP. Results 541 research projects were identified, 452 in Germany and 89 in Austria. Research projects were only included if they were explicitly indicated as research-oriented. Seventy projects addressed PCM aspects, 15 projects HP aspects, 32 projects PRE aspects and 396 projects CM aspects. The most frequently target groups in the categories PCM (24 of 70) and HP (7 of 15) were chronically ill patients. The most common thematic focus in PCM was communication (13 of 70) and in HP, physical activity (6 of 15). Conclusion The vast majority of research projects investigated conventional medical topics. The percentage of research activities in the field of PCM (13%) or PCM including HP (16%) in Ger and At is below the European average of 20%. From our point of view, PCM and HP need to be implemented to a greater extent in general practice. © Georg Thieme Verlag KG Stuttgart · New York.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less

  18. METC Clean Coal Technology status -- 1995 update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, L.K.

    1995-06-01

    The Department of Energy (DOE) Clean Coal Technology (CCT) Program is assisting the private sector by funding demonstration programs to validate that CCT technologies are a low-risk, environmentally attractive, cost-competitive option for utility and industrial users. Since 1987, DOE has awarded 45 CCT projects worth a total value of $7 billion (including more than $2.3 billion of DOE funding). Within the CCT Program, the Morgantown Energy Technology Center (METC) is responsible for 17 advanced power generation systems and major industrial applications. METC is an active partner in advancement of these technologies via direct CCT funding and via close cooperation andmore » coordination of internal and external research and development activities. By their nature, METC projects are typically 6-10 years in duration and, in some cases, very complex in nature. However, as a result of strong commercial partnerships, progress in the development and commercialization of major utility and industrial projects has, and will continue to occur. It is believed that advanced power generation systems and industrial applications are on the brink of commercial deployment. A status of METC CCT activities will be presented. Two projects have completed their operational phase, operations are underway at one project (two others are in the latter stages of construction/shakedown), four projects are in construction, six restructured. Also, present a snapshot of development activities that are an integral part of the advancement of these CCT initiatives will be presented.« less

  19. A 12 years brazilian space education activity experience

    NASA Astrophysics Data System (ADS)

    Stancato, Fernando; Gustavo Catalani Racca, João; Ballarotti, MaurícioG.

    2001-03-01

    A multidisciplinary group of students from the university and latter also from the high school was formed in 1988 with the objective to make them put in practice their knowledge in physics, chemistry and mathematics and engineering fields in experimental rocketry. The group was called "Grupo de Foguetes Experimentais", GFE. Since that time more than 150 students passed throw the group and now many of them are in the space arena. The benefits for students in a space hands-on project are many: More interest in their school subjects is gotten as they see an application for them; Interrelation attitudes are learned as space projects is a team activity; Responsibility is gained as each is responsible for a part of a critical mission project; Multidisciplinary and international experience is gotten as these are space project characteristics; Learn how to work in a high stress environment as use to be a project launch. This paper will cover the educational experiences gotten during these years and how some structured groups work. It is explained the objectives and how the group was formed. The group structure and the different phases that at each year the new team passes are described. It is shown the different activities that the group uses to do from scientific seminars, scientific club and international meetings to technical tours and assistance to rocket activities in regional schools. It is also explained the group outreach activities as some launches were covered by the media in more then 6 articles in newspaper and 7 television news. In 1999 as formed an official group called NATA, Núcleo de Atividades Aerospaciais within the Universidade Estadual de Londrina, UEL, by some GFE members and teachers from university. It is explained the first group project results.

  20. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    PubMed

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

Top