Science.gov

Sample records for activities installation maintenance

  1. Active Solar Energy System Design, Installation and Maintenance Manual.

    DTIC Science & Technology

    1986-04-01

    material choice that meets these requirements is ethylene- propylene-diene-monomer ( EPDM ) rubber. Ease of installation is the second item to be considered...allowing a single thermometer to be moved from row to row for testing . * The thermometer should be Installed Initially on the same row - as the collector...require the flushing and pressure testing of the solar system piping. 7. Define responsibility for coordination of the contractor’s work. 8. Operational

  2. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  3. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  4. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  5. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical... 46 Shipping 4 2011-10-01 2011-10-01 false Design, installation, and maintenance. 129.200 Section... from electrical hazards, including fire, caused by or originating in electrical equipment...

  6. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical... 46 Shipping 4 2010-10-01 2010-10-01 false Design, installation, and maintenance. 129.200 Section... from electrical hazards, including fire, caused by or originating in electrical equipment...

  7. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  8. Guide to Preparing Work Descriptions for Performance Work Statements for Contracted Maintenance Activities for Army Installation Directorates of Logistics

    DTIC Science & Technology

    1991-05-01

    400-2, The Modern Army Recordkeeping System (MARKS) ()A, 15 October 1986). AR 50-5, Nuclear and Chemical Weapons and Material - Nuclear Surety (DA... Material Handling Equipment MIG Magnesium Inert Gas MILVAN Military Van MIMS Maintenance Information Management Systems MLSP Microfix Logistic Support...Facility Systems (FS) Division of the U.S. Army Construction Engineering Research Laboratory (USACERL). The principal investigator was Mr. Donald K

  9. GOES data-collection system instrumentation, installation, and maintenance manual

    USGS Publications Warehouse

    Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.

    1986-01-01

    The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)

  10. Landscape Installation and Maintenance: A Junior College Curriculum Guide.

    ERIC Educational Resources Information Center

    Matthews, Ralph E.

    Increasing interest in landscaping resulting from a growth in construction, the recent national emphasis on beautification, and expansion of outdoor recreational facilities has created a demand for personnel trained in landscape installation and maintenance. This guide provides suggestions for: (1) initiating one- and two-year programs in…

  11. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units §...

  12. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units §...

  13. Electrical Installation and Maintenance: A Competency-Based Curriculum Manual.

    ERIC Educational Resources Information Center

    Ball, Peggy, Ed.; And Others

    Described is a competency-based community college curriculum for programs in electrical installation and maintenance. The initial curriculum development project involved identifying career opportunities, determining the skills (tasks) required for each job, and analyzing each task for necessary competencies and performance criteria. Project…

  14. Prediction of the safety level to an installation of the tritium process through predictive maintenance

    SciTech Connect

    Anghel, V.

    2008-07-15

    The safety level for personnel and environment to a nuclear installation is given in generally by the technological process quality of operation and maintenance and in particular by a lot of technical, technological, economic and human factors. The maintenance role is fundamental because it has to quantify all the technical, economic and human elements as an integrated system for it creates an important feedback for activities concerning the life cycle of the nuclear installation. In maintenance activities as in any dynamic area, new elements appear continuously which, sometimes require new approaches. The theory of fuzzy logic and the software LabVIEW supplied to the Nuclear Detritiation Plant (NDP) is part of National Research and Development Inst. for Cryogenics and Isotopic Technologies-ICIT, Rm.Valcea, used for predictive maintenance to assure safety operation. The final aim is to achieve the best practices for maintenance of the Plant that processes tritium. (authors)

  15. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  16. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  17. Borehole dilatometer installation, operation, and maintenance at sites in Hawaii

    USGS Publications Warehouse

    Myren, G.D.; Johnston, M.J.S.; Mueller, R.J.

    2006-01-01

    In response to concerns about the potential hazard of Mauna Loa volcano in Hawaii, the USGS began efforts in 1998 to add four high-resolution borehole sites. Located at these sites are; strainmeters, tiltmeters, seismometers, accelerometers and other instrumentation. These instruments are capable of providing continuous monitoring of the magma movement under Mauna Loa. Each site was planned to provide multi-parameter monitoring of volcanic activity. In June of 2000, a contract was let for the core drilling of three of these four sites. They are located at Hokukano (west side of Mauna Loa) above Captain Cook, Hawaii; at Mauna Loa Observatory (11,737 feet near the summit), and at Mauna Loa Strip Road (east side of Mauna Loa). Another site was chosen near Halema'uma u' and Kilauea's summit, in the Keller deep well. (See maps). The locations of these instruments are shown in Figure 1 with their latitude and longitude in Table 1. The purpose of this network is to monitor crustal deformation associated with volcanic intrusions and earthquakes on Mauna Loa and Kilauea volcanoes. This report describes the methods used to locate sites, install dilatometers, other instrumentation, and telemetry. We also provide a detailed description of the electronics used for signal amplification and telemetry, plus techniques used for instrument maintenance. Instrument sites were selected in regions of hard volcanic rock where the expected signals from magmatic activity were calculated to be a maximum and the probability of earthquakes with magnitude 4 or greater is large. At each location, an attempt was made to separate tectonic and volcanic signals from known noise sources for each instrument type.

  18. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance requirements. Electrical equipment on a vessel must be installed... 46 Shipping 7 2011-10-01 2011-10-01 false General design, installation, and...

  19. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance requirements. Electrical equipment on a vessel must be installed... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and...

  20. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS ELECTRICAL INSTALLATION General Requirements § 120.200 General design, installation, and maintenance requirements. Electrical equipment on a vessel must be installed and maintained to: (a) Provide... 46 Shipping 4 2011-10-01 2011-10-01 false General design, installation, and...

  1. 30 CFR 75.1600-2 - Communication facilities; working sections; installation and maintenance requirements; audible or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; installation and maintenance requirements; audible or visual alarms. 75.1600-2 Section 75.1600-2 Mineral... sections; installation and maintenance requirements; audible or visual alarms. (a) Telephones or equivalent... alarm, distinguishable from the surrounding noise level, or a visual alarm that can be seen by a...

  2. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads. Roadbeds and all elements of the railroad tracks shall be designed, installed, and maintained to...

  3. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads. Roadbeds and all elements of the railroad tracks shall be designed, installed, and maintained to...

  4. 30 CFR 28.3 - Installation, use, and maintenance of approved fuses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS FUSES FOR USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES General Provisions § 28.3 Installation, use, and... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation, use, and maintenance of...

  5. IEA HPP ANNEX 36: QUALITY INSTALLATION / QUALITY MAINTENANCE SENSITIVITY ANALYSIS

    SciTech Connect

    Hourahan, Mr. Glenn; Domanski, Dr. Piotr; Baxter, Van D

    2011-01-01

    The paper summarizes the goals and planned activities to be undertaken by the participants in Annex 36. Some background information and status of Annex work specific to each participant is provided as well.

  6. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants for Stationary Reciprocating Internal Combustion Engines Testing and Initial Compliance... HAP emissions, you must install a non-resettable hour meter prior to the startup of the engine. (e) If... the maintenance and operation of the engine in a manner consistent with good air pollution...

  7. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Stationary Reciprocating Internal Combustion Engines Testing and Initial Compliance... HAP emissions, you must install a non-resettable hour meter prior to the startup of the engine. (e) If... the maintenance and operation of the engine in a manner consistent with good air pollution...

  8. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads....

  9. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads....

  10. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads....

  11. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads....

  12. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads....

  13. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  14. 10 CFR 35.2605 - Records of installation, maintenance, adjustment, and repair of remote afterloader units...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of installation, maintenance, adjustment, and repair of remote afterloader units, teletherapy units, and gamma stereotactic radiosurgery units. 35.2605 Section 35.2605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records §...

  15. 10 CFR 35.2605 - Records of installation, maintenance, adjustment, and repair of remote afterloader units...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Records of installation, maintenance, adjustment, and repair of remote afterloader units, teletherapy units, and gamma stereotactic radiosurgery units. 35.2605 Section 35.2605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records §...

  16. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.2269 Section 63.2269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...

  17. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.2269 Section 63.2269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...

  18. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.2269 Section 63.2269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...

  19. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of...

  20. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of...

  1. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of...

  2. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot gas inlet chambers and all ductwork in which coal dust may accumulate shall be equipped with...

  3. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  4. Installation, Operation and Maintenance for Reverse Osmosis Element Cleaning and Preservation System (ROECPS).

    DTIC Science & Technology

    1990-07-31

    U.S. MARINE CORPS TECHNICAL MANUAL INSTALLATION, OPERATION AND MAINTENANCE FOR REVERSE OSMOSIS ELEMENT CLEANING AND PRESERVATION SYSTEM (ROECPS) THIS...copies are being forwarded . Indicate whether Statement A, B, C, D, E, F, or X applies. El] DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE...document was previously forwarded to DTIC on (date) and the AD number is El In accordance with provisions of DoD instructions, the document requested

  5. Have the best available trap on the job, check design, installation, and maintenance

    SciTech Connect

    Spires, F.; Toy, D.A.

    1986-12-01

    Industrial and commercial installations can have much more efficient steam systems with properly designed, installed, and maintained steam traps. Thirty years ago, steam trap maintenance did not have near the significance it does today; fuel costs have risen from about $0.30 per 1000 lb of steam to over 25 times that a few years ago to about 15 times that cost today. Worn or otherwise malfunctioning steam traps can take quite a toll on the energy bill, especially since most traps are designed to fail in the open position. Failure of just one steam trap with a 1/2'' diameter orifice in the open position can cost $45,090 a year. This article gives guidelines for the prevention of steam trap failures.

  6. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    SciTech Connect

    Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  7. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63...—Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems As stated.... Colormetric tube sampling system Use a colormetric tube sampling system with a printed numerical scale in...

  8. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems As stated in § 63.1572(c)(1... no more than ±15 percent. System must include a gas detection pump and hot air probe if needed...

  9. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems As stated in § 63.1572(c)(1... no more than ±15 percent. System must include a gas detection pump and hot air probe if needed...

  10. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63...—Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems As stated... deviation for measured values of no more than ±15 percent. System must include a gas detection pump and...

  11. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63...—Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems As stated... deviation for measured values of no more than ±15 percent. System must include a gas detection pump and...

  12. Summary Article: IEA HPP Annex 36: Quality Installation / Quality Maintenance Sensitivity Studies

    DOE PAGES

    Hourahan, Glenn; Domanski, Piotr; Baxter, Van D.

    2015-01-01

    The outcome from this Annex activity clearly identifies that poorly designed, installed, and/or maintained heat pumps operate inefficiently and waste considerable energy compared to their as-designed potential. Additionally, it is clear that small faults for a given field-observed practice are significant, that some attribute deviations (in various equipment applications and geographical locations) have a larger impact than others, and that multiple faults or deviations have a cumulative impact on heat pump performance.

  13. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the...

  14. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the...

  15. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the...

  16. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false What are the conditions for funding the installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation? 310.20 Section 310.20 Public Welfare Regulations Relating to Public Welfare OFFICE OF CHILD SUPPORT ENFORCEMENT (CHILD SUPPORT ENFORCEMENT...

  17. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol...

  18. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true If I monitor brew ethanol, what are my... monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? (a... section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in water...

  19. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol...

  20. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the...

  1. 32 CFR 634.40 - General off installation traffic activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.40 General off installation traffic activities. In areas not under military control, civil... with civil authorities. Army and Air Force installation law enforcement authorities will establish...

  2. Cognitive Aging: Activity Patterns and Maintenance Intentions

    ERIC Educational Resources Information Center

    Gilhooly, K. J.; Gilhooly, M. L.; Phillips, L. H.; Harvey, D.; Murray, A.; Hanlon, P.

    2007-01-01

    This study examined relationships between cognitive functioning in older people and (1) levels of mental, physical and social activities, and (2) intentions regarding maintenance of cognitive functioning. Participants (N = 145) were 70-91 years of age, varied in health status and socio-economic backgrounds. Current cognitive functioning was…

  3. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  4. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    SciTech Connect

    Baldock, Nick; Sevilla, Fernando; Redfern, Robin; Storey, Alexis; Kempenaar, Anton; Elkinton, Chris

    2014-12-19

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model

  5. U.S. Navy Wire-Rope Handbook. Volume 3. Installation, Maintenance, and Inspection of Wire Rope

    DTIC Science & Technology

    1976-01-01

    See CABLEWAYS and TRAMWAYS. AGGREGATE BREAKING STRENGTH (OR LOAD) -- See BREAKING STRENGTH. ALBERT’S LAY -- See LANG-LAY. ALTERNATE LAY -- Lay of rope ... cableway , skyline, or ropeway which supports the load-carrying carriage. TRACTION ROPE -- Wire rope that propels the carriages on an aerial conveyor...Lfl Lfl I" U. S. NAVY WIRE- ROPE HANDBOOK * .% VOLUME III DTIC •IELECTE• ON I OCT 191987D INSTALLATION, MAINTENANCE, D AND INSPECTION OF WIRE ROPE CC

  6. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Quality Planning and Standards; Emissions, Monitoring and Analysis Division; Emission Measurement Center... must be installed in each baghouse compartment or cell. (7) For negative pressure or induced air...

  7. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Quality Planning and Standards; Emissions, Monitoring and Analysis Division; Emission Measurement Center... must be installed in each baghouse compartment or cell. (7) For negative pressure or induced air...

  8. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type... temperature sensor must be installed in the combustion chamber at a location in the combustion zone. (iii) For... is greater. The thermocouple or temperature sensor must be installed in the vent stream at...

  9. The Effect of Line Maintenance Activity on Airline Safety Quality

    NASA Technical Reports Server (NTRS)

    Rhoades, Dawna L.; Reynolds, Rosemarie; Waguespack, Blaise, Jr.; Williams, Michael

    2005-01-01

    One of the arguments against deregulation of the airline industry has been the possibility that financially troubled carriers would be tempted to lower line maintenance spending, thus lowering maintenance quality and decreasing the overall safety of the carrier. Given the financial crisis triggered by the events of 9/11: it appears to be a good time to revisit this issue. This paper examines the quality of airline line maintenance activity and examines the impact of maintenance spending on maintenance quality and overall safety. Findings indicate that increased maintenance spending is associated with increased line maintenance activity and increased overall safety quality for the major U.S. carriers.

  10. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and...

  11. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and...

  12. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and...

  13. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and...

  14. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you...

  15. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you...

  16. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you...

  17. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you...

  18. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you...

  19. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Network (TTN) under Emission Measurement Center Continuous Emission Monitoring. Other types of bag leak... filters, the bag leak detector must be installed downstream of the fabric filter. (8) Where...

  20. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Network (TTN) under Emission Measurement Center Continuous Emission Monitoring. Other types of bag leak... filters, the bag leak detector must be installed downstream of the fabric filter. (8) Where...

  1. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous...

  2. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous...

  3. Maintenance Resources by Building Use for U.S. Army Installations. Volume 2. Appendices A through H

    DTIC Science & Technology

    1991-05-01

    MAINTENANCE - INSTALLATION UG PB TB O&R 21910 FE MAINT SHOP 21912 TIMBR TREAT FAC 21920 FE FACILITY 21922 ENTOMOLOGY FAC 44228 INSECTICIDE STR 00 SUPPLY...AUDITORIUM/THEATER FACILITY UW Q5 S5 74010 AUDITORIUM/THEATER FACILITY 74026 ENTERTAINMENT WORKSHOP 74027 DRAMA CENTER 74043 MUSIC CENTER 74076...TA 21888 CAN/LEATH SHOP 21800 UF PA TA 21889 CALIBRATION FAC 21800 UF PA TA 21910 FE MAINT SHOP 21900 UG PB TB 21912 TIMBR TREAT FAC 21900 UG PB TB

  4. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subject to a carbon monoxide emission limit in Table 1 to this subpart, you must install, operate, and... Performance Specification 3 at 40 CFR part 60, appendix B. (3) Each CEMS must complete a minimum of one cycle...) of this section. (1) The continuous parameter monitoring system must complete a minimum of one...

  5. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Pollutants for Stationary Reciprocating Internal Combustion Engines Testing and Initial Compliance... HAP emissions, you must install a non-resettable hour meter prior to the startup of the engine. (e) If... operation of the engine in a manner consistent with good air pollution control practice for...

  6. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must complete a minimum of one cycle of operation (sampling, analyzing, and data recording) for each successive 15-minute period. (4) Data must be reduced as specified in § 63.8(g)(2). (b) You must install... one cycle of sampling and analyzing for each successive 10-second period and one cycle of...

  7. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., operate, and maintain each continuous parameter monitoring system (CPMS) according to the following: (1... install a continuous emissions monitoring system (CEMS) or a continuous opacity monitoring system (COMS... part 60, appendix B. (g) For each monitoring system required in this section, you must develop and...

  8. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate... sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the..., and all mechanical connections for leakage. (2) For the scrubber water flow rate CPMS, you must:...

  9. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate... sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the..., and all mechanical connections for leakage. (2) For the scrubber water flow rate CPMS, you must:...

  10. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate... sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the..., and all mechanical connections for leakage. (2) For the scrubber water flow rate CPMS, you must:...

  11. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollutants for Stationary Reciprocating Internal Combustion Engines Testing and Initial Compliance... of the engine. (e) If you own or operate any of the following stationary RICE, you must operate and... practicable for the maintenance and operation of the engine in a manner consistent with good air...

  12. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants for Stationary Reciprocating Internal Combustion Engines Testing and Initial Compliance... of the engine. (e) If you own or operate any of the following stationary RICE, you must operate and... practicable for the maintenance and operation of the engine in a manner consistent with good air...

  13. 40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with an alarm that will sound when an increase in relative particulate loadings is detected over the... including temperature and humidity according to the procedures in the operation and maintenance plan... and record the combustion zone temperature according to the requirements in paragraphs (d)(1)...

  14. The Environment for Application Software Integration and Execution (EASIE) version 1.0. Volume 4: System installation and maintenance guide

    NASA Technical Reports Server (NTRS)

    Randall, Donald P.; Jones, Kennie H.; Rowell, Lawrence F.

    1988-01-01

    The Environment for Application Software Integration and Execution (EASIE) provides both a methodology and a set of software utility programs to ease the task of coordinating engineering design and analysis codes. This document provides necessary information for installing the EASIE software on a host computer system. The target host is a DEX VAX running VMS version 4; host dependencies are noted when appropriate. Relevant directories and individual files are identified, and compile/load/execute sequences are specified. In the case of the data management utilities, database management system (DBMS) specific features are described in an effort to assist the maintenance programmer in converting to a new DBMS. The document also describes a sample EASIE program directory structure to guide the program implementer in establishing his/her application dependent environment.

  15. [Occupational radiation exposures during maintenance activities at nuclear power plants].

    PubMed

    Imahori, A

    1987-11-01

    Occupational exposures at nuclear power plants occur mostly during maintenance activities rather than during routine reactor operation. In this paper, statistical summaries of occupational exposures during routine maintenance activities for the years 1982-84 at nuclear power plants in Japan are presented, including comparison of the exposure levels by reactor type and by plant age. Average annual collective doses per reactor for BWRs and PWRs are 7.30 man-Sv and 2.84 man-Sv, respectively, and 78% and 89% of annual doses are incurred during maintenance activities. Average annual outage days of BWRs and PWRs for routine maintenance are 102 d and 97 d. Annual collective doses per reactor, most of which occur during maintenance activities, usually increase with plant age. Higher collective doses are observed for routine maintenance performed on older reactors as compared to newer reactors, especially in BWRs. Collective doses accrued during respective routine maintenance activities have a significant correlation with duration of maintenance and number of workers involved in maintenance.

  16. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Conservation activity operation and maintenance. 1470... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance....

  17. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Conservation activity operation and maintenance. 1470... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance....

  18. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Conservation activity operation and maintenance. 1470... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance....

  19. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Conservation activity operation and maintenance. 1470... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance....

  20. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Conservation activity operation and maintenance. 1470... CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance....

  1. 78 FR 679 - Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... previously approved work spaces. In addition, the Commission proposes to add landowner notification... their existing rights-of-way, with construction activities limited to the work space that was previously... activities have not been constrained in this way; therefore, to now impose right-of-way and work...

  2. Installing hydrolytic activity into a completely de novo protein framework

    NASA Astrophysics Data System (ADS)

    Burton, Antony J.; Thomson, Andrew R.; Dawson, William M.; Brady, R. Leo; Woolfson, Derek N.

    2016-09-01

    The design of enzyme-like catalysts tests our understanding of sequence-to-structure/function relationships in proteins. Here we install hydrolytic activity predictably into a completely de novo and thermostable α-helical barrel, which comprises seven helices arranged around an accessible channel. We show that the lumen of the barrel accepts 21 mutations to functional polar residues. The resulting variant, which has cysteine-histidine-glutamic acid triads on each helix, hydrolyses p-nitrophenyl acetate with catalytic efficiencies that match the most-efficient redesigned hydrolases based on natural protein scaffolds. This is the first report of a functional catalytic triad engineered into a de novo protein framework. The flexibility of our system also allows the facile incorporation of unnatural side chains to improve activity and probe the catalytic mechanism. Such a predictable and robust construction of truly de novo biocatalysts holds promise for applications in chemical and biochemical synthesis.

  3. Automobile Maintenance. Reading and Language Activities.

    ERIC Educational Resources Information Center

    Kessman, William A.

    Designed primarily for special needs students in a vocational program in automobile maintenance, this book was written to refine the basic skills of following directions, reading comprehension, vocabulary building, spelling, word usage, and word recognition, while relating these skills to some of the tasks a beginning student in the program must…

  4. 76 FR 26311 - Agency Information Collection Activities: Harbor Maintenance Fee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... SECURITY U.S. Customs and Border Protection Agency Information Collection Activities: Harbor Maintenance... concerning the Harbor Maintenance Fee (CBP Forms 349 and 350). This request for comment is being made... keepers from the collection of information (a total capital/startup costs and operations and...

  5. Improved installation prototype for measurement of low argon-37 activity

    NASA Astrophysics Data System (ADS)

    Pakhomov, Sergei; Dubasov, Yuri

    2015-04-01

    On-site Inspection (OSI) is a key element of verification of State Parties' compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT). An on-site inspection is launched to establish whether or not a nuclear explosion has been carried out. One of the most significant evidence of n underground nuclear explosion (UNE) is detection above background concentrations of argon-37 in near surface air. Argon-37 is formed in large amounts at interaction of neutrons of UNE with the potassium which is a part of the majority of rocks. Its estimated contents for the 100th days after explosion with a energy of 1000 t of TNT near a surface can vary from 1 to 1000 mBq/m3. The background concentrations of argon-37 in subsoil air vary 1 do100 mBq/m3. Traditionally, for argon-37 activity measurement the gas-proportional counters are used. But at Khlopin Radium institute the developments of the new type of highly sensitive and low-background installation capable to provide the required range of measurements of the argon-37 concentration are conducted. The liquid scintillation method of the registration of the low-energetic argon-37 electrons is the basic installation principle and as scintillator, the itself condensed air argon sample is used. Registration of scintillations of liquid argon is made by means of system from 3 PMT which cathodes are cooled near to the temperature of liquid nitrogen together with the measuring chamber in which placed the quartz glass ampule, containing the measured sample of the liquefied argon. For converse the short wavelength photons (λ = 127 nm) of liquid argon scintillations to more long-wave, corresponding to the range of PMT sensitivity, the polymer film with tetra-phenyl-butadiene (TPB) is provided. Even the insignificant impurities of nitrogen, oxygen and others gaseous in the liquid argon samples can to cause the quenching of scintillation, especially their slow components. To account this effect and it influence on change of registration

  6. The 1996-2009 borehole dilatometer installations, operation, and maintenance at sites in Long Valley Caldera, CA

    USGS Publications Warehouse

    Myren, Glenn; Johnston, Malcolm; Mueller, Robert

    2011-01-01

    High seismicity levels with accelerating uplift (under the resurgent dome) in Long Valley caldera in the eastern Sierra Nevada from 1989 to 1997, triggered upgrades to dilational strainmeters and other instrumentation installed in the early 1980's following a series of magnitude 6 earthquakes. This included two additional high-resolution borehole strainmeters and replacement of the failed strainmeter at Devil's Postpile. The purpose of the borehole-monitoring network is to monitor crustal deformation and other geophysical parameters associated with volcanic intrusions and earthquakes in the Long Valley Caldera. Additional instrumentation was added at these sites to improve the capability of providing continuous monitoring of the magma source under the resurgent dome. Sites were selected in regions of hard crystalline rock, where the expected signals from magmatic activity were calculated to be a maximum and the probability of an earthquake of magnitude 4 or greater is large. For the most part, the dilatometers were installed near existing arrays of surface tiltmeters, seismometers, level line, and GPS arrays. At each site, attempts are made to separate tectonic and volcanic signals from known noise sources in each instrument type. Each of these sites was planned to be a multi-parameter monitoring site, which included measurements of 3-component seismic velocity and acceleration, borehole strain, tilt, pore pressure and magnetic field. Using seismicity, geophysical knowledge, geologic and topographic maps, and geologists recommendations, lists of preliminary sites were chosen. Additional requirements were access, and telemetry constraints. When the final site choice was made, a permit was obtained from the U.S. Forest Service. Following this selection process, two new borehole sites were installed on the north and south side of the Long Valley Caldera in June of 1999. One site was located near Big Spring Campground to the east of Crestview. The second site was

  7. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE...

  8. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE...

  9. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE...

  10. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE...

  11. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE...

  12. 40 CFR 63.9632 - What are the installation, operation, and maintenance requirements for my monitoring equipment?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... instrumentation and alarm may be shared among detectors. (8) The bag leak detector sensor must be installed... monitoring plan. (f) For each dry electrostatic precipitator subject to the opacity operating limit in §...

  13. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  14. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  15. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  16. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  17. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  18. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... monitoring systems? (a) If you choose the continuous mercury monitoring option under § 63.8240(a), you must install, operate, and maintain each mercury continuous emissions monitor according to paragraphs...

  19. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... monitoring systems? (a) If you choose the continuous mercury monitoring option under § 63.8240(a), you must install, operate, and maintain each mercury continuous emissions monitor according to paragraphs...

  20. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... monitoring systems? (a) If you choose the continuous mercury monitoring option under § 63.8240(a), you must install, operate, and maintain each mercury continuous emissions monitor according to paragraphs...

  1. 40 CFR 63.9632 - What are the installation, operation, and maintenance requirements for my monitoring equipment?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... negative pressure baghouse or positive pressure baghouse equipped with a stack, applied to meet any particulate emission limit in Table 1 to this subpart, you must install, operate, and maintain a bag leak detection system according to the requirements in paragraphs (a)(1) through (8) of this section. (1)...

  2. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... monitoring systems? (a) If you choose the continuous mercury monitoring option under § 63.8240(a), you must install, operate, and maintain each mercury continuous emissions monitor according to paragraphs...

  3. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... monitoring systems? (a) If you choose the continuous mercury monitoring option under § 63.8240(a), you must install, operate, and maintain each mercury continuous emissions monitor according to paragraphs...

  4. An acoustically controlled tetherless underwater vehicle for installation and maintenance of neutrino detectors in the deep ocean

    SciTech Connect

    Ballou, Philip J.

    1997-02-01

    The task of installing and servicing high energy neutrino detectors in the deep ocean from a surface support vessel is problematic using conventional tethered systems. An array of multiple detector strings rising 500 m from the ocean floor, and forming a grid with 50 m spacing between the strings, presents a substantial entanglement hazard for equipment cables deployed from the surface. Such tasks may be accomplished with fewer risks using a tetherless underwater remotely operated vehicle that has a local acoustic telemetry link to send control commands and sensor data between the vehicle and a stationary hydrophone suspended above or just outside the perimeter of the work site. The Phase I effort involves the development of an underwater acoustic telemetry link for vehicle control and sensor feedback, the evaluation of video compression methods for real-time acoustic transmission of video through the water, and the defining of local control routines on board the vehicle to allow it to perform certain basic maneuvering tasks autonomously, or to initiate a self-rescue if the acoustic control link should be lost. In Phase II, a prototype tetherless vehicle system will be designed and constructed to demonstrate the ability to install cable interconnections within a detector array at 4 km depth. The same control technology could be used with a larger more powerful vehicle to maneuver the detector strings into desired positions as they are being lowered to the ocean floor.

  5. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  6. Time Use Patterns between Maintenance, Subsistence and Leisure Activities: A Case Study in China

    ERIC Educational Resources Information Center

    Hui-fen, Zhou; Zhen-shan, Li; Dong-qian, Xue; Yang, Lei

    2012-01-01

    The Chinese government conducted its first time use survey of the activities of Chinese individuals in 2008. Activities were classified into three broad types, maintenance activities, subsistence activities and leisure activities. Time use patterns were defined by an individuals' time spent on maintenance, subsistence and leisure activities each…

  7. Systems analysis of the installation, mounting, and activation of emergency locator transmitters in general aviation aircraft

    NASA Technical Reports Server (NTRS)

    Hall, D. S.

    1980-01-01

    A development program was developed to design and improve the Emergency Locator Transmitter (ELT) transmitter and to improve the installation in the aircraft and its activation subsystem. There were 1135 general aviation fixed wing aircraft accident files reviewed. A detailed description of the damage to the aircraft was produced. The search aspects of these accidents were studied. As much information as possible about the ELT units in these cases was collected. The data should assist in establishing installation and mounting criteria, better design standards for activation subsystems, and requirements for the new ELT system design in the area of crashworthiness.

  8. Determinants and benefits of physical activity maintenance in hospital employees.

    PubMed

    Lavoie-Tremblay, Mélanie; Sounan, Charles; Martin, Kara; Trudel, Julie G; Lavigne, Genevieve L; Grover, Steven A; Lowensteyn, Ilka

    2014-01-01

    This study investigated whether the positive behavioral and anthropometric outcomes of a pedometer-based physical activity 8-week challenge were maintained 6 months after the end of the program. It further investigated the motivational profile of those who maintained their physical activity levels in the months following the end of the program and of those who did not. Hospital employees from a university-affiliated multisite health care center in Canada participated using a questionnaire. Of the 235 participants who completed the 8-week challenge, 157 questionnaires were returned 6 months later. Paired-samples t tests were conducted between the baseline and follow-up scores as well as between the postprogram and follow-up scores to detect significant differences between the measurement points. This study shows that the pedometer-based physical activity helped hospital employees maintain a high level of physical activity as well as maintain a healthy body mass index after 6 months. The results demonstrated that during maintenance the high physical activity group obtained higher scores for identified regulation and intrinsic regulation compared with the other groups. The results of the study revealed that identified and intrinsic regulations are important contributors to maintaining physical activity among hospital employees.

  9. 15 CFR 908.11 - Maintenance of records of related activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS MAINTAINING RECORDS AND SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.11 Maintenance of records of related activities. (a) Persons whose activities relate to weather modification activities, other than persons engaged in weather modification activities, shall maintain records...

  10. Specification for installation of the crew activity planning system coaxial cable communication system

    NASA Technical Reports Server (NTRS)

    Allen, M. A.; Roman, G. S.

    1979-01-01

    The specification used to install a broadband coaxial cable communication system to support remote terminal operations on the Crew Activity Planning system at the Lyndon B. Johnson Space Center are reported. The system supports high speed communications between a Harris Slash 8 computer and one or more Sanders Graphic 7 displays.

  11. Operation and Maintenance Manual, Record Drawings, and Summary of Initial Results for the Expanded Bioventing System Installed at Site SS-41 (Former Fuel Pumping Station Number 3), Charleston AFB, SC

    DTIC Science & Technology

    2007-11-02

    This letter transmits three copies of the Operation and Maintenance (O&M) Manual prepared for the expanded bioventing system recently installed at...ES) at the site from February through June 1997. Included in this report are the initial bioventing system operating parameters and sampling results

  12. 76 FR 50489 - Agency Information Collection Activities: Harbor Maintenance Fee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... Fee AGENCY: U.S. Customs and Border Protection, Department of Homeland Security. ACTION: 30-Day Notice... approval in accordance with the Paperwork Reduction Act: Harbor Maintenance Fee (CBP Forms 349 and 350... information collection: Title: Harbor Maintenance Fee. OMB Number: 1651-0055. Form Number: CBP Forms 349...

  13. Electrical activity of the orbicularis muscles before and after installation of ocular prostheses.

    PubMed

    Goiato, M C; Santos, M R; Monteiro, B C Z; Moreno, A; Bannwart, L C; Filho, A J V; Guiotti, A M; Haddad, M F; Pesqueira, A A; Dos Santos, D M

    2015-01-01

    This study examined the electrical activity of the superior (SO) and inferior (IO) orbicularis oculi muscles before and after installing ocular prostheses in patients who had undergone unilateral enucleation. Twelve volunteers requiring prostheses were selected. Their electrical activity was monitored at rest and during normal opening and closing of the eyelids, rapid opening and closing of the eyelids, and squeezing. Data were recorded before and 7, 30, and 60 days after the ocular prosthesis was installed. Two-way analysis of variance was performed to verify whether there were any significant differences between the muscles and periods, and means were compared by Tukey-Kramer honestly significant difference (HSD) tests (P < 0.05). Results from the initial period differed significantly from those after prosthesis installation in all clinical situations. The SO had significantly higher electrical activity levels than the IO in all clinical situations but squeezing. The authors observed the same values during the initial period for the condition of rest (SO 8.42/IO 5.93) and the highest values for the condition of squeezing after 60 days (SO 131.50/IO 117.12). Rehabilitative treatment promoted an increase in the electrical activity of the orbicularis oculi muscles, restoring part of the muscle tone and motor function to muscles of the affected area.

  14. 2011 Operations and Maintenance Activities in the East Region of UNAVCO's Plate Boundary Observatory

    NASA Astrophysics Data System (ADS)

    Dittmann, T.; Feaux, K.; Kasmer, D.; Jenkins, F.; Mencin, D.

    2011-12-01

    2011 marked Year 3 of Operations and Maintenance of the Plate Boundary Observatory (PBO). In the East Region of PBO, it was a year characterized by several major projects as well as scheduled ongoing maintenance activities. The most significant major project was a USGS/ARRA funded communications upgrade in Yellowstone National Park. This upgrade consisted of bringing 8 existing PBO stations within the Yellowstone volcanic region to near real-time communications. This work will be completed on time and in collaboration with the National Park Service. The upgrade promises to provide much faster latency for invaluable data being recorded for one of the most geodetically critical regions of the current PBO network. Another significant ongoing project in the East Region has been supporting the community that continues to use PBO data. In particular, support of Kristine Larson (Univ of CO) both in installing webcams at PBO sites for monitoring snow depth as well as supporting vegetative surveys at current PBO sites. Similarly, the East Region responded promptly to the community with requests for data quality issues that are station hardware related, including replacing GPS antennae and receivers. With regards to ongoing operations and maintenance projects, reasons for site visits in 2011 were dominated by two significant situations: battery replacement and CDMA modem swaps. 83 site visits were required as part of the Operations and Maintenance strategic battery plan of 5 year battery replacements. This proved to be a considerable challenge due to the scale and geography of the scheduled replacements- the sites were spread throughout the entire network, east to west and north to south. 20 station visits were required due to a Verizon upgrade of the older Alltel network purchased by Verizon. These stations are predominantly in the Rocky Mountain region, but often times had limited access to due weather. Overall, despite record snowfalls throughout the west, state of health

  15. RPMA (Real Property Maintenance Activities) Consolidation Activities in the National Capital Region. Volume 1. Main Report.

    DTIC Science & Technology

    1984-05-01

    planning the activities of future IPCs. Pre-IPC Activities Participating installations should have been directed through command channels to take the...the task with minimal impact on the existing A workload, and (2) ensure that the request for inforniation is formal and sent through channels . Planners...34... . .•.....¢,.. -...... ,- % * .*. ...... ....... .°. •.-.-.-. •..... 39. The District init inttei the cofl ract Ior <I’MA t i i on;, e i, ( I i HQDA through command channels . 40

  16. Current research activities and installation status of the X-ray imaging crystal spectrometer for KSTAR

    NASA Astrophysics Data System (ADS)

    Lee, S. G.; Bak, J. G.; Nam, U. W.; Moon, M. K.; Cheon, J. K.; Bitter, M.; Hill, K.

    2008-11-01

    An X-ray imaging crystal spectrometer (XICS) for KSTAR utilizing a four-segmented position-sensitive two dimensional (2D) multi-wire proportional counter and time-to-digital converter (TDC) based delay-line readout data acquisition system has been fabricated. The XICS provides spatially and temporally resolved measurements of the ion and electron temperatures, toroidal rotation velocity, impurity charge-state distributions, and ionization equilibrium. The four-segmented 2D detector with supporting electronics successfully demonstrated to improve the photon count-rate capability of the XICS system and a position resolution of the detector showed about 0.35 mm. A spectral resolution of the fabricated spectrometer has been measured using an X-ray tube before installation in the KSTAR tokamak. The current research activities and installation status of the spectrometer will be presented.

  17. Implementation of an enhanced, permanently installed neutron activation diagnostic hardware for NIF

    NASA Astrophysics Data System (ADS)

    Jedlovec, Donald R.; Edwards, Ellen R.; Carrera, Jorge A.; Yeamans, Charles B.

    2015-08-01

    Neutron activation diagnostics are commonly employed as baseline neutron yield and relative spatial flux measurement instruments. Much insight into implosion performance has been gained by deployment of up to 19 identical activation diagnostic samples distributed around the target chamber at unique angular locations. Their relative simplicity and traceability provide neutron facilities with a diagnostic platform that is easy to implement and verify. However, the current National Ignition Facility (NIF) implementation relies on removable activation samples, creating a 1-2 week data turn-around time and considerable labor costs. The system described here utilizes a commercially-available lanthanum bromide (cerium-doped) scintillator with an integrated MCA emulator as the counting system and a machined zirconium-702 cap as the activation medium. The device is installed within the target bay and monitored remotely. Additionally, this system allows the placement of any activation medium tailored to the specific measurement needs. We discuss the design and function of a stand-alone and permanently installed neutron activation detector unit to measure the yield and average energy of a nominal 14 MeV neutron source with a pulse length less than one nanosecond.

  18. Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3

    SciTech Connect

    Meichle, R.H.

    1994-11-08

    This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

  19. Centromere Pairing in Early Meiotic Prophase Requires Active Centromeres and Precedes Installation of the Synaptonemal Complex in Maize[W

    PubMed Central

    Zhang, Jing; Pawlowski, Wojciech P.; Han, Fangpu

    2013-01-01

    Pairing of homologous chromosomes in meiosis is critical for their segregation to daughter cells. In most eukaryotes, clustering of telomeres precedes and facilitates chromosome pairing. In several species, centromeres also form pairwise associations, known as coupling, before the onset of pairing. We found that, in maize (Zea mays), centromere association begins at the leptotene stage and occurs earlier than the formation of the telomere bouquet. We established that centromere pairing requires centromere activity and the sole presence of centromeric repeats is not sufficient for pairing. In several species, homologs of the ZIP1 protein, which forms the central element of the synaptonemal complex in budding yeast (Saccharomyces cerevisiae), play essential roles in centromere coupling. However, we found that the maize ZIP1 homolog ZYP1 installs in the centromeric regions of chromosomes after centromeres form associations. Instead, we found that maize STRUCTURAL MAINTENANCE OF CHROMOSOMES6 homolog forms a central element of the synaptonemal complex, which is required for centromere associations. These data shed light on the poorly understood mechanism of centromere interactions and suggest that this mechanism may vary somewhat in different species. PMID:24143803

  20. Does proximity to physical activity infrastructures predict maintenance of organized and unorganized physical activities in youth?

    PubMed Central

    MacKenzie, Jason; Brunet, Jennifer; Boudreau, Jonathan; Iancu, Horia-Daniel; Bélanger, Mathieu

    2015-01-01

    Physical activity (PA) infrastructures can provide youth chances to engage in PA. As determinants of organized and unorganized PA (OPA and UPA) may differ, we investigated if proximity to PA infrastructures (proximity) was associated with maintenance of OPA and UPA over 3 years. Youth from New Brunswick, Canada (n = 187; 10–12 years at baseline) reported participation in OPA and UPA every 4 months from 2011 to 2014 as part of the MATCH study. Proximity data were drawn from parent's questionnaires. Proximity scores were divided into tertiles. Kaplan–Meier and Cox proportional hazard models were used to assess associations between proximity and maintenance of OPA and UPA. There were no crude or adjusted differences in average maintenance of participation in OPA [mean number of survey cycle participation (95%CI) was 6.6 (5.7–7.5), 6.3 (5.5–7.1), and 5.8 (5.1–6.6)] or UPA [6.8 (6.2–7.4), 5.9 (5.3–6.5), and 6.6 (5.9–7.3)] across low, moderate, and high tertiles of proximity, respectively. Findings suggest that proximity does not affect maintenance of participation in OPA or UPA during adolescence. Other environmental aspects may have a greater effect. Further research is needed before conclusions can be made. PMID:26844149

  1. School Bus and School Pupil Activity Bus Inspection and Maintenance Guide.

    ERIC Educational Resources Information Center

    Sowash, Fred W.

    This publication deals with suggested maintenance standards that apply to vehicles used for pupil transportation in California and covers all the safety-related systems that are common to most buses. The guide has been prepared to help all school bus and school pupil activity bus operators set up an inspection and preventive maintenance program…

  2. 77 FR 66958 - Agency Information Collection Activities; Comment Request; Form for Maintenance of Effort Waiver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... Agency Information Collection Activities; Comment Request; Form for Maintenance of Effort Waiver Requests... notice will be considered public records. Title of Collection: Form for Maintenance of Effort Waiver... (SEA) finds that either the combined fiscal effort per student or the aggregate expenditures of the...

  3. 40 CFR 86.1834-01 - Allowable maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Administrator is installed to alert the vehicle driver that maintenance is due. A signal bearing the message... malfunction (e.g., misfiring, stalling, black smoke), or an activation of an audible and/or visible...

  4. Field Test and Performance Verification: Integrated Active Desiccant Rooftop Hybrid System Installed in a School - Final Report: Phase 4A

    SciTech Connect

    Fischer, J

    2005-12-21

    This report summarizes the results of a field verification pilot site investigation that involved the installation of a hybrid integrated active desiccant/vapor-compression rooftop heating, ventilation, and air-conditioning (HVAC) unit at an elementary school in the Atlanta Georgia area. For years, the school had experienced serious humidity and indoor air quality (IAQ) problems that had resulted in occupant complaints and microbial (mold) remediation. The outdoor air louvers of the original HVAC units had been closed in an attempt to improve humidity control within the space. The existing vapor compression variable air volume system was replaced by the integrated active desiccant rooftop (IADR) system that was described in detail in an Oak Ridge National Laboratory (ORNL) report published in 2004 (Fischer and Sand 2004). The IADR system and all space conditions have been monitored remotely for more than a year. The hybrid system was able to maintain both the space temperature and humidity as desired while delivering the outdoor air ventilation rate required by American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 62. The performance level of the IADR unit and the overall system energy efficiency was measured and found to be very high. A comprehensive IAQ investigation was completed by the Georgia Tech Research Institute before and after the system retrofit. Before-and-after data resulting from this investigation confirmed a significant improvement in IAQ, humidity control, and occupant comfort. These observations were reported by building occupants and are echoed in a letter to ORNL from the school district energy manager. The IADR system was easily retrofitted in place of the original rooftop system using a custom curb adapter. All work was completed in-house by the school's maintenance staff over one weekend. A subsequent cost analysis completed for the school district by the design engineer of record concluded that the IADR system

  5. The Value Assessment Method for Evaluating Preventive Maintenance Activities.

    DTIC Science & Technology

    1991-08-01

    Managemnt and Budget, Paperwork Reduction Prolec (0704-0188). Washington. DC 205M. 1. AGENCY USE ONLY (Leave Blank) 12. REPORT DATE j3. REPORT TYPE...Office. COL Everett R . Thomas is Commander and Director of USACERL, and Dr. L.R. Shaffer is Technical Director. Accesion For / ---- NTIS CR J&I T % ~O...automated system also provides a data base for easy input or recall o17 the maintenance history for each unit serviced. Data base r -quirements for a

  6. Implementing ARFORGEN: Installation Capability and Feasibility Study of Meeting ARFORGEN Guidelines

    DTIC Science & Technology

    2007-07-26

    one - stop -shop to perform some Soldier out- processing activities (Y/N) • Installation has a one - stop -shop to perform some Soldier in- processing...Percentage of Soldier who pass first CIF inspection Installation Other Out Service Times • Service time for a Soldier to perform one - stop activities...Service time for Soldier to perform non one - stop Activities Installation / Soldier Housing maintenance Service Times • Service time for

  7. Installation of passive-active shufflers at Los Alamos plant environments

    SciTech Connect

    Hurd, J.R.; Hsue, F.; Rinard, P.M.; Wachter, J.R.; Davidson, C.

    1994-08-01

    Two Canberra-built passive-active {sup 252}Cf shufflers of Los Alamos hardware and software design have been installed and are presently undergoing calibration and certification at Los Alamos National Laboratory. These instruments fulfill important safeguards and accountability measurement requirements for special nuclear material in matrices too dense or otherwise not appropriate for typical gamma-ray techniques. The ability of the shuffler to obtain precise assays under conditions of intense passive emissions of neutrons and gamma rays is a valuable asset in plant environments. This paper reports on the procurement process and the various steps involved in the installation of two shufflers at Los Alamos, one at the Chemical Metallurgical Research (CMR) Building Waste Assay Facility at TA-3 and the other at the PF4 Plutonium Facility at TA-55. Details are given on the certification procedure including the development of standards, various expected matrices, and calibration. Some safety issues are addressed, and some preliminary performance characteristics are presented based on measured background rates in the plant environments.

  8. Influence of malfunctions of the maintenance activities on the urban buses fuel consumption

    NASA Astrophysics Data System (ADS)

    George, Crişan; Nicolae, Filip

    2014-06-01

    Optimization of activities with the aim to provide quality service in conditions of high profitability, is one of the main objectives chased by managers in transportation companies. As a consequence, directing the attention towards monitoring of maintenance activities of vehicles fleet, can achieve desired results. Two of the most important issues related to the maintenance activity, is the increase of reliability and reduction of fuel consumption of the vehicles fleet. Aforementioned actions represents a way forward for raising the quality and profitability of services offered. In this paper, the main ways of monitoring the fuel consumption, in order to reduce it and increase the reliability of transportation vehicles fleet, are presented. For the evaluation of the maintenance system and the degree of influence of malfunctions recorded on the fuel consumption, using the Pareto -ABC method, following case study on a fleet of buses for urban public transport has been conducted. Results obtained highlights the deficiencies of the maintenance process carried out and constitutes a solid base for the reorganization of the maintenance activity, involving preventive maintenance activities, in order to contribute decisively to the results targeted by the management of transport companies.

  9. Influence of Experimental Installation on Photocatalytic Activity of Sputtered Nb-Doped TiO2 Thin Film

    NASA Astrophysics Data System (ADS)

    Hieu, N. M.; Lan, N. T.; Loc, N. B.; Hang, N. T. T.; Tien, N. T.; Thanh, P. V.; Quynh, L. M.; Luong, N. H.; Hoang, N. L. H.

    2017-02-01

    We present an efficient experimental method to investigate the photocatalytic activity of Nb-doped TiO2 (TNO) polycrystalline film deposited on glass substrate by sputtering. The photocatalytic activity of the thin film was evaluated by oxidative photodegradation of methylene blue (MB) solution at wavelength of 292 nm in the ultraviolet (UV) region. Two ways of installing a UV light source to illuminate the sample were demonstrated: (a) with UV light coming from the front of the thin film through the MB solution, and (b) with UV light coming from the back of the thin film through the glass substrate. Compared with installation (a), which is often applied for photocatalytic activity investigation, the influence of the UV light on the dye solution is removed in installation (b), resulting in significantly improved illuminating light intensity. The results show that the photocatalytic efficiency of the thin film with installation (b) was two times higher than that with installation (a). Thus the proposed approach (b) for installing the UV light source is more promising for investigation of photocatalytic properties.

  10. KC-46 Workforce Requirements for Depot Maintenance Activation

    DTIC Science & Technology

    2014-03-27

    as International Standard for Organization ( ISO 9001 ) rating, and Aerospace Standards (AS 9100) rating (International Organization for...crew chief wages, management wages, purchasing activities, engineering activities, stock handlers wages, production control activities, quality ... Managment 5, 105-112. G-14 Americas Aerospace Quality Standards Committee . (2009, January 15). Quality Management Systems - Requirements for

  11. The preventive effect of physical activity on weight maintenance in overweight and obese women.

    PubMed

    Dashti, Sareh; Esfehani, Ali Jafarzadeh; Leonard Joseph, H J

    2014-01-01

    Prevalence of obesity has increased recently especially in women. Obesity is related to mortality due to non-communicable diseases and has become a public health issue. Among the two important factors to reduce weight calorie limitation alone is modestly effective in initial weight but can result in weight gain after primary weight reduction is common. Therefore adding physical activity to weight maintenance program can reduce weight gain rebound. The aim of this review article was to identify the preventive effect of physical activity on weight maintenance in overweight women. Articles were selected from PubMed database and screened for the relativity to the study objectives, using scoring systems. Eleven studies were found appropriate. No statistical test was done on the data except simple mean and some descriptive analyses. Physical activity is proved to have a significant effect in weight loss/maintenance both in induction and maintenance period. This effect was more significant in higher intensities. Sever intensity physical activity can be effective in weight maintenance in long term but the effect of moderate and light physical activity could not be evaluated due to lack of data.

  12. Office of Inspector General audit report on maintenance activities at the Y-12 Plant

    SciTech Connect

    1999-05-01

    The Office of Inspector General has not reviewed maintenance activities at the Y-12 Plant in recent years. However, an audit was performed of maintenance activities at the East Tennessee Technology Park (formerly the K-25 Site) in February 1994. The audit concluded that Lockheed Martin (formerly Martin Marietta Energy Systems) had not effectively used engineered performance standards to estimate maintenance hours, and had not adequately analyzed variances between actual and estimated hours to identify and correct maintenance inefficiencies. The objective of this audit was to determine whether Lockheed Martin used performance measures to identify and correct inefficiencies in its maintenance program. Lockheed Martin did not adequately use performance measures to identify and correct inefficiencies in its maintenance program. Specifically, Lockheed Martin did not adequately apply engineered time standards in estimating jobs, nor did it use variance analysis to resolve deviations from job plans. This condition occurred because Lockheed Martin did not fully implement Departmental guidelines. As a result, Lockheed martin missed opportunities to improve its performance and cost-effectiveness.

  13. 75 FR 42698 - Takes of Marine Mammals Incidental to Specified Activities; Installation of Meteorological Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... installation of wind turbines. Bluewater has proposed installing a single 3-meter diameter pile foundation to... comments. SUMMARY: NMFS has received two applications from Bluewater Wind (Bluewater) for an Incidental...) on the Issuance of Leases for Wind Resource Data Collection on the Outer Continental Shelf...

  14. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  15. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    SciTech Connect

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs.

  16. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  17. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  18. Evidence for the maintenance of motoneurone properties by msucel activity.

    PubMed Central

    Czéh, G; Gallego, R; Kudo, N; Kuno, M

    1978-01-01

    1. Electrophysiological properties of soleus motoneurones in adult cats were examined with intracellular electrodes following alterations of activity of the soleus muscle induced by transection of the thoracic spinal cord or by conduction block of the muscle nerve with tetrodotoxin (TTX) cuffs. Attempts were also made to maintain muscle activity by daily stimulation of the maintain muscle activity by daily stimulation of the peripheral nerve. 2. Within 8 days after transection of the thoracic cord, soleus motoneurones showed a significant decrease in the duration of afterhyperpolarization following action potentials. This change in motoneurone properties induced by cord transection was prevented by daily stimulation of the sciatic nerve. 3. Soleus motoneurones showed a significant decrease in the duration of after-hyperpolarization within 8 days after conduction block of the soleus nerve with TTX. This change in montoneurone properties was prevented by daily stimulation of the nerve peripheral to the TTX cuff but not central to the cuff. 4. The soleus muscle showed a significant decrease in weight relative to body weight within 8 days after transection of the thoracic cord. This decrease in muscle weight following cord transection was prevented by daily stimulation of the sciatic nerve. 5. No fibrillation was detected in the soleus muscle 8 days after conduction block of the soleus nerve with TTX. The maximum twitch tension of the soleus muscle evoked by nerve stimulation showed no significant difference between the two sides treated and untreated with TTX. Fast axoplasmic transport measured with cholinesterase as a marker was not affected by TTX. Thus, there was no sign of functional although morphological abnormalities were found in some nerve fibres. 6. It is concluded that motoneurone properties in an adult depend partly upon some factors associated with activity of the innervated muscles and that such trophic signals are retrogradely carried by the motor axons

  19. 24 CFR 35.935 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Rehabilitation § 35.935 Ongoing lead-based paint maintenance activities. In the case of a rental... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Ongoing lead-based...

  20. 24 CFR 35.935 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Rehabilitation § 35.935 Ongoing lead-based paint maintenance activities. In the case of a rental... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Ongoing lead-based...

  1. 24 CFR 35.935 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Rehabilitation § 35.935 Ongoing lead-based paint maintenance activities. In the case of a rental... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Ongoing lead-based...

  2. 24 CFR 35.935 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Rehabilitation § 35.935 Ongoing lead-based paint maintenance activities. In the case of a rental... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Ongoing lead-based...

  3. 24 CFR 35.935 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Rehabilitation § 35.935 Ongoing lead-based paint maintenance activities. In the case of a rental... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Ongoing lead-based...

  4. Maintenance: organizational modes, activities and health and safety. Use of a French national survey and in-situ analyses.

    PubMed

    Grusenmeyer, Corinne

    2014-12-01

    Maintenance activities are identified as critical both to operator safety and to systems safety and reliability. However, it is still difficult to identify maintenance workers in French occupational accident and disease statistics. Moreover, few analyses of these activities and of organizational changes in this field have been conducted. This paper presents two different approaches to this same issue. Analyses were aimed firstly at identifying the occupational exposures of these operators and at comparing them with occupational exposures of production staff and, secondly at developing understanding of normal real maintenance activities, i.e. maintenance activities that are normally actually carried out, while taking into account the socio-technical system and maintenance organization within which they lie. The use of the French SUMER 2003 survey shows that occupational exposures of maintenance staff to various constraints are more frequent than occupational exposures of their production colleagues. However, maintenance staff appear to have greater independence. Analyses were also conducted in a subcontracting urban public transport company, who outsources some maintenance work. Those analyses highlight a complex network of companies involved in maintenance activities, a substantial number of work interruptions and a significant fragmentation of the internal technicians' activities that can be cognitively costly, reduce anticipation possibilities and lead to incidents or accidents. Above all they underline internal technicians' contributions to the completion of outsourced interventions and interdependent relationships between the activities of the internal and the external technicians. Outsourcing maintenance interventions thus raises the question of risks associated with the interdependence of actual work activities undertaken by the different types of staff, since they contribute to the same maintenance intervention. This study therefore pinpoints the need to

  5. Natural resources management activities and biodiversity maintenance. Progress report, July 1, 1993--June 30, 1994

    SciTech Connect

    Caudell, M.B.

    1994-05-01

    This progress report briefly outlines activities at the Crackerneck Wildlife Management Area. Thirty-nine days were spent administering hunts with 1524 people participating. Biological data was collected on 89 deer, 6 turkeys, 8 feral hogs, 40 ducks of two species, 24 bobwhite, 3 rabbits, 2 gray squirrels, and 313 fish of 8 species. Public relations, maintenance and hunt preparation activities are summarized as well.

  6. Brain activation during associative short-term memory maintenance is not predictive for subsequent retrieval

    PubMed Central

    Bergmann, Heiko C.; Daselaar, Sander M.; Beul, Sarah F.; Rijpkema, Mark; Fernández, Guillén; Kessels, Roy P. C.

    2015-01-01

    Performance on working memory (WM) tasks may partially be supported by long-term memory (LTM) processing. Hence, brain activation recently being implicated in WM may actually have been driven by (incidental) LTM formation. We examined which brain regions actually support successful WM processing, rather than being confounded by LTM processes, during the maintenance and probe phase of a WM task. We administered a four-pair (faces and houses) associative delayed-match-to-sample (WM) task using event-related functional MRI (fMRI) and a subsequent associative recognition LTM task, using the same stimuli. This enabled us to analyze subsequent memory effects for both the WM and the LTM test by contrasting correctly recognized pairs with incorrect pairs for either task. Critically, with respect to the subsequent WM effect, we computed this analysis exclusively for trials that were forgotten in the subsequent LTM recognition task. Hence, brain activity associated with successful WM processing was less likely to be confounded by incidental LTM formation. The subsequent LTM effect, in contrast, was analyzed exclusively for pairs that previously had been correctly recognized in the WM task, disclosing brain regions involved in successful LTM formation after successful WM processing. Results for the subsequent WM effect showed no significantly activated brain areas for WM maintenance, possibly due to an insensitivity of fMRI to mechanisms underlying active WM maintenance. In contrast, a correct decision at WM probe was linked to activation in the “retrieval success network” (anterior and posterior midline brain structures). The subsequent LTM analyses revealed greater activation in left dorsolateral prefrontal cortex and posterior parietal cortex in the early phase of the maintenance stage. No supra-threshold activation was found during the WM probe. Together, we obtained clearer insights in which brain regions support successful WM and LTM without the potential confound

  7. Financial Motivation Undermines Maintenance in an Intensive Diet and Activity Intervention

    PubMed Central

    Moller, Arlen C.; McFadden, H. Gene; Hedeker, Donald; Spring, Bonnie

    2012-01-01

    Financial incentives are widely used in health behavior interventions. However, self-determination theory posits that emphasizing financial incentives can have negative consequences if experienced as controlling. Feeling controlled into performing a behavior tends to reduce enjoyment and undermine maintenance after financial contingencies are removed (the undermining effect). We assessed participants' context-specific financial motivation to participate in the Make Better Choices trial—a trial testing four different strategies for improving four health risk behaviors: low fruit and vegetable intake, high saturated fat intake, low physical activity, and high sedentary screen time. The primary outcome was overall healthy lifestyle change; weight loss was a secondary outcome. Financial incentives were contingent upon meeting behavior goals for 3 weeks and became contingent upon merely providing data during the 4.5-month maintenance period. Financial motivation for participation was assessed at baseline using a 7-item scale (α = .97). Across conditions, a main effect of financial motivation predicted a steeper rate of weight regained during the maintenance period, t(165) = 2.15, P = .04. Furthermore, financial motivation and gender interacted significantly in predicting maintenance of healthy diet and activity changes, t(160) = 2.42, P = .016, such that financial motivation had a more deleterious influence among men. Implications for practice and future research on incentivized lifestyle and weight interventions are discussed. PMID:22548152

  8. Lessons Learned from Outsourcing the Pearl Harbor MK-48 Intermediate Maintenance Activity

    DTIC Science & Technology

    2008-03-01

    this case study is to evaluate this effort and to show the applicability of market-based tools in the public sector, and especially by the Department... study was to conduct a qualitative and quantitative evaluation of the model used to outsource the Intermediate Maintenance Activity (IMA) for the MK-48...torpedo, which is currently performed at in Pearl Harbor (Hawaii) by Raytheon Company. This research is oriented as a case study analysis for public

  9. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    PubMed

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  10. CLEAN-ROADS project: air quality considerations after the application of a novel MDSS on winter road maintenance activities

    NASA Astrophysics Data System (ADS)

    Pretto, Ilaria; Malloci, Elisa; Tonidandel, Gabriele; Benedetti, Guido; Di Napoli, Claudia; Piazza, Andrea; Apolloni, Roberto; Cavaliere, Roberto

    2016-04-01

    With this poster we present the environmental benefit on air quality derived by the application of the CLEAN-ROADS pilot project. The CLEAN-ROADS project addresses the problem of the environmental pollution caused by de-icing salts during winter road maintenance activities in the Province of Trento (Italy). A demonstrative Maintenance Decision Support System (MDSS) has been developed in order to improve the intervention procedures of the road management service. Specifically it aims to optimize the efficiency of how available resources (e.g., salt consumption) are currently used while guaranteeing the current level of road safety. The CLEAN-ROADS project has been tested and validated on a test area located in a valley bottom (Adige Valley), where the highest optimization margins are to be expected. The project supports current road maintenance practices, which has proved to be reliable and accurate, with a new scalable and energy-efficient road monitoring system. This system is based on a network of road weather stations (road weather information system, RWIS) installed on the test route. It is capable to collect real-time data about the road conditions and to perform short-term and now-cast road weather forecasts, which actively integrate weather data and bulletins covering the target area [1]. This poster presents the results obtained from a three-year monitoring activity with the aim to (1) determine the impact of de-icing salts on air quality and (2) quantify the improvements obtained by the application of the CLEAN-ROADS project on air quality. The Ambient Air Quality and Cleaner Air for Europe Directive (2008/50/EC) states that contributions to exceedances of particulate matter PM10 limit values that are attributable to road winter salting may be subtracted when assessing compliance with air quality limit values, once provided that reasonable measures have been taken to lower concentrations [2]. As the de-icing salts used in road maintenance are mainly based

  11. Natural resources management activities and biodiversity maintenance. Progress report, July 1, 1994--June 30, 1995

    SciTech Connect

    Caudell, M.B.

    1995-05-01

    This progress report for the Natural Resources Management Activities and Biodiversity Maintenance for the time period July 1, 1994 - June 30, 1995 was submitted to the DOE by the South Carolina Department of Natural Resources. The activities devoted to revitilization of wildlife areas and reintroduction of various animal species to wildlife areas (such as Crackerneck Wildlife Management Area) are described. Other information regarding site characterization, land use and resource management in South Carolina is provided. Also, a description of attendence to various meetings and certification seminars is covered.

  12. A new focus on operation and maintenance activities and the role of EPA

    SciTech Connect

    Griffith, J.A.; Hopkins, N.; Taylor, J.

    1996-12-31

    The Environmental Protection Agency`s (EPA) Superfund program, which was established pursuant to the Comprehensive Environmental Response. Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, governs the cleanup of domestic hazardous waste sites. After Superfund sites undergo the cleanup process, additional site activities may be necessary to ensure that the remedy continues to operate effectively and the cleanup continues to protect human health and the environment. Examples of these operation and maintenance (O and M) activities include the maintenance of contaminated soil covers to prevent erosion, the continuing operation of treatment systems for contaminated groundwater or surface water, and the ongoing monitoring of land or water use restrictions. According to a May 1995 General Accounting Office (GAO) report, Information on Operations and Maintenance Activities and Costs, roughly 62 percent of the 229 National Priorities List (NPL) sites reviewed where the remedy had been constructed required some long-term actions resulting from the remedy choice. EPA monitors the O and M activities of states and PRPs to ensure that they are being performed. Monitoring O and M activities, which is vital to preserving the integrity of cleanup remedies, includes the requirement that EPA review certain sites every five years. This paper will highlight EPA`s policies for managing O and M issues throughout the Superfund pipeline, transferring O and M to the state, performing O and M review, and termination of O and M. This paper also generally covers O and M issues of concern to PRPs.

  13. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  14. 77 FR 70846 - Regulatory Guide 1.182, “Assessing and Managing Risk Before Maintenance Activities at Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... Chief, Regulatory Guide Development Branch, Division of Engineering, Office of Nuclear Regulatory... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Regulatory Guide 1.182, ``Assessing and Managing Risk Before Maintenance Activities at...

  15. Department of the Navy Justification of Estimates for Fiscal Year 1987 Submitted to Congress February 1986. Operation & Maintenance, Navy. Book 2. Budget Activity 7: Central Supply and Maintenance.

    DTIC Science & Technology

    1986-02-01

    1,969 -288 *.*.. TOT,SHP LNCHD WPN RWK/MNT 7 T IMT ,0 In T7 = 700911 • .-. .... Activity Group: Ship Launched Weapons Rework and Maintenance (cont’d...34 Provides funds for the inspection, testing, repair, and alteration of Swimmer Delivery Vehicles (SDV) and Dry Deck Shelters (DDS), Underwater Breathing...projections. Support is provided for the Swimmer Area Navigation System (100), and handheld sonar (350). One additional Dry Deck Shelter will be

  16. Food activities and identity maintenance in old age: a systematic review and meta-synthesis

    PubMed Central

    Plastow, Nicola Ann; Atwal, Anita; Gilhooly, Mary

    2015-01-01

    Objectives: Services provided to older people should be developed based on active ageing policies. Nutrition is one aspect of active ageing, but little is known about how food activities contribute to psychological well-being in later life. This is a systematic review of qualitative and quantitative research that answers the question ‘What is known about the relationship between food activities and the maintenance of identities in old age?’. Methods: We followed the preferred reporting items for systematic reviews and meta-analyses guidelines and used quality assessment parameters to complete a systematic review and narrative synthesis. Academic Search Premier, MEDLINE, CINAHL Plus, and PsycINFO databases were searched. Results: We initially identified 8016 articles, of which 167 full-text articles were screened for inclusion. Twenty-two articles were included in the review. There was moderate evidence from nine qualitative and two quantitative studies, of variable quality, that food activities contribute to the maintenance of women's gendered identities, the ethnic identities of men and women, and community identities. There was moderate evidence from 10 qualitative studies, of variable quality, that a change in food choice and deteriorating health changed food activity participation. These changes threatened identities. Most studies included both younger adults and older adults. Conclusion: In later life, there are many life experiences leading to change. Further research is needed to develop understanding of how identity and mental well-being are maintained, despite changes in everyday activities like cooking and eating. This may enable health care professionals to meet psychological needs alongside biological needs during nutritional interventions. PMID:25373998

  17. USAF Training Extract, AFSC 2MOX2 - Active Duty, Missile & Space Systems Maintenance, Active Duty, OSSN 2522

    DTIC Science & Technology

    2003-08-01

    MOD VII launch support systems 1 2 4 1 4 3 3 ( LSSs ) cables F0499 Remove or install operational or...VII launch support systems 1 2 4 1 4 3 ( LSSs ) cables F0499 Remove or install operational or...F0498 Remove or install MOD VII launch support systems 1 1 ( LSSs ) cables F0499 Remove or install operational or

  18. The pseudokinase CaMKv is required for the activity-dependent maintenance of dendritic spines

    PubMed Central

    Liang, Zhuoyi; Zhan, Yi; Shen, Yang; Wong, Catherine C. L.; Yates, John R.; Plattner, Florian; Lai, Kwok-On; Ip, Nancy Y.

    2016-01-01

    Dendritic spine stabilization depends on afferent synaptic input and requires changes in actin cytoskeleton dynamics and protein synthesis. However, the underlying molecular mechanism remains unclear. Here we report the identification of ‘calmodulin kinase-like vesicle-associated' (CaMKv), a pseudokinase of the CaMK family with unknown function, as a synaptic protein crucial for dendritic spine maintenance. CaMKv mRNA localizes at dendrites, and its protein synthesis is regulated by neuronal activity. CaMKv function is inhibited upon phosphorylation by cyclin-dependent kinase 5 (Cdk5) at Thr345. Furthermore, CaMKv knockdown in mouse hippocampal CA1 pyramidal neurons impairs synaptic transmission and plasticity in vivo, resulting in hyperactivity and spatial memory impairment. These findings collectively indicate that the precise regulation of CaMKv through activity-dependent synthesis and post-translational phosphorylation is critical for dendritic spine maintenance, revealing an unusual signalling pathway in the regulation of synaptic transmission and brain function that involves a pseudokinase. PMID:27796283

  19. Persistent neural activity during the maintenance of spatial position in working memory.

    PubMed

    Srimal, Riju; Curtis, Clayton E

    2008-01-01

    The mechanism for the short-term maintenance of information involves persistent neural activity during the retention interval, which forms a bridge between the cued memoranda and its later contingent response. Here, we used event-related functional magnetic resonance imaging to identify cortical areas with activity that persists throughout working memory delays with the goal of testing if such activity represents visuospatial attention or prospective saccade goals. We did so by comparing two spatial working memory tasks. During a memory-guided saccade (MGS) task, a location was maintained during a delay after which a saccade was generated to the remembered location. During a spatial item recognition (SIR) task identical to MGS until after the delay, a button press indicated whether a newly cued location matched the remembered location. Activity in frontal and parietal areas persisted above baseline and was greater in the hemisphere contralateral to the cued visual field. However, delay-period activity did not differ between the tasks. Notably, in the putative frontal eye field (FEF), delay period activity did not differ despite that the precise metrics of the memory-guided saccade were known during the MGS delay and saccades were never made in SIR. Persistent FEF activity may therefore represent a prioritized attentional map of space, rather than the metrics for saccades.

  20. The role of exercise and physical activity in weight loss and maintenance.

    PubMed

    Swift, Damon L; Johannsen, Neil M; Lavie, Carl J; Earnest, Conrad P; Church, Timothy S

    2014-01-01

    This review explores the role of physical activity (PA) and exercise training (ET) in the prevention of weight gain, initial weight loss, weight maintenance, and the obesity paradox. In particular, we will focus the discussion on the expected initial weight loss from different ET programs, and explore intensity/volume relationships. Based on the present literature, unless the overall volume of aerobic ET is very high, clinically significant weight loss is unlikely to occur. Also, ET also has an important role in weight regain after initial weight loss. Overall, aerobic ET programs consistent with public health recommendations may promote up to modest weight loss (~2 kg), however the weight loss on an individual level is highly heterogeneous. Clinicians should educate their patients on reasonable expectations of weight loss based on their physical activity program and emphasize that numerous health benefits occur from PA programs in the absence of weight loss.

  1. Maintenance of plastid RNA editing activities independently of their target sites.

    PubMed

    Tillich, Michael; Poltnigg, Peter; Kushnir, Sergei; Schmitz-Linneweber, Christian

    2006-03-01

    RNA editing in plant organelles is mediated by site-specific, nuclear-encoded factors. Previous data suggested that the maintenance of these factors depends on the presence of their rapidly evolving cognate sites. The surprising ability of allotetraploid Nicotiana tabacum (tobacco) to edit a foreign site in the chloroplast ndhA messenger RNA was thought to be inherited from its diploid male ancestor, Nicotiana tomentosiformis. Here, we show that the same ndhA editing activity is also present in Nicotiana sylvestris, which is the female diploid progenitor of tobacco and which lacks the ndhA site. Hence, heterologous editing is not simply a result of tobacco's allopolyploid genome organization. Analyses of other editing sites after sexual or somatic transfer between land plants showed that heterologous editing occurs at a surprisingly high frequency. This suggests that the corresponding editing activities are conserved despite the absence of their target sites, potentially because they serve other functions in the plant cell.

  2. Development of Enhanced, Permanently-Installed, Neutron Activation Diagnostic Hardware for NIF

    NASA Astrophysics Data System (ADS)

    Edwards, E. R.; Jedlovec, D. R.; Carrera, J. A.; Yeamans, C. B.

    2016-05-01

    Neutron activation diagnostics are baseline neutron yield and flux measurement instruments at the National Ignition Facility. Up to 19 activation samples are distributed around the target chamber. Currently the samples must be removed to be counted, creating a 1-2 week data turn-around time and considerable labor costs. An improved system consisting of a commercially available LaBr3(Ce) scintillator and Power over Ethernet electronics is under development. A machined zirconium-702 cap over the detector is the activation medium to measure the 90Zr(n,2n)89Zr reaction. The detectors are located at the current neutron activation diagnostic sites and monitored remotely. Because they collect data in real time yield values are returned within a few hours after a NIF shot.

  3. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  4. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  5. Guideline to good practices for types of maintenance activities at DOE nuclear facilities

    SciTech Connect

    Not Available

    1993-03-01

    The purpose of the Guideline to Good Practices for Types of Maintenance at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a properly balanced corrective, preventive and predictive maintenance program at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 4. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance programs that are applicable to their facility.

  6. A natural product telomerase activator as part of a health maintenance program: metabolic and cardiovascular response.

    PubMed

    Harley, Calvin B; Liu, Weimin; Flom, Peter L; Raffaele, Joseph M

    2013-10-01

    A short average telomere length is associated with low telomerase activity and certain degenerative diseases. Studies in animals and with human cells confirm a causal mechanism for cell or tissue dysfunction triggered by critically short telomeres, suggesting that telomerase activation may be an approach to health maintenance. Previously, we reported on positive immune remodeling in humans taking a commercial health maintenance program, PattonProtocol-1, composed of TA-65® (a natural product-derived telomerase activator) and other dietary supplements. In over a 5-year period and an estimated 7000 person-years of use, no adverse events or effects have been attributed to TA-65 by physicians licensed to sell the product. Here we report on changes in metabolic markers measured at baseline (n=97-107 subjects) and every 3-6 months (n=27-59 subjects) during the first 12 months of study. Rates of change per year from baseline determined by a multi-level model were -3.72 mg/dL for fasting glucose (p=0.02), -1.32 mIU/mL for insulin (p=0.01), -13.2 and -11.8 mg/dL for total cholesterol and low-density lipoprotein cholesterol (LDL-C) (p=0.002, p=0.002, respectively), -17.3 and -4.2 mmHg for systolic and diastolic blood pressure (p=0.007 and 0.001, respectively), and -3.6 μmole/L homocysteine (p=0.001). In a subset of individuals with bone mineral density (BMD) measured at baseline and 12 months, density increased 2.0% in the spine (p=0.003). We conclude that in addition to apparent positive immune remodeling, PattonProtocol-1 may improve markers of metabolic, bone, and cardiovascular health.

  7. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  8. Concentrating solar collector-installation package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Report contains general description of concentrating solar collector and tracking system kit, along with comprehensive drawings, instructions, and guidelines to assist in field assembly, installation, operation, and maintenance of system.

  9. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Compliance requirements for environmental laws applicable to REMR activities. Final report

    SciTech Connect

    Henderson, J.E.; Peyman-Dove, L.D.

    1988-08-01

    Operation and maintenance (OandM) activities of the Corps of Engineers must comply with the environmental laws and regulations just as other Corps activities and private actions. The OandM procedures developed under the Repair, Evaluation, Maintenance, and Rehabilitation (REMR) Research Program might result in water pollution, use or disposal of hazardous or toxic materials, or other actions that are regulated by environmental laws. A previous review of environmental laws for applicability to REMR activities identified 14 laws, regulations, or executive orders that may require compliance actions (Technical Report REMR-EI-1).

  10. Physics of Colloids in Space: Microgravity Experiment Launched, Installed, and Activated on the International Space Station

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    2002-01-01

    The Physics of Colloids in Space (PCS) experiment is a Microgravity Fluids Physics investigation that is presently located in an Expedite the Process of Experiments to Space Station (EXPRESS) Rack on the International Space Station. PCS was launched to the International Space Station on April 19, 2001, activated on May 31, 2001, and will continue to operate about 90 hr per week through May 2002.

  11. Cryogenics maintenance strategy

    NASA Astrophysics Data System (ADS)

    Cruzat, Fabiola

    2012-09-01

    ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.

  12. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    PubMed Central

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414

  13. Civilian Demonstrations Near the Military Installation: Restraints on Military Surveillance and Other Intelligence Activities

    DTIC Science & Technology

    1992-03-01

    may be used as a tool to deter lawful political activity, and courts may view overt military surveillance as evidence of a bad faith purpose instead of...a good faith physical security purpose.19 Evidence of bad faith makes it more likely that a court will find standing.󈨧 Surveillance can become...event of a delu~ohoal aflhto srenewved or the iiaUtKi’i is o)therisie nainr and assorted Srauik" fils may be McAWi~i * retnainabh!e munder this

  14. Transcriptional Activation by Oct4 Is Sufficient for the Maintenance and Induction of Pluripotency

    PubMed Central

    Hammachi, Fella; Morrison, Gillian M.; Sharov, Alexei A.; Livigni, Alessandra; Narayan, Santosh; Papapetrou, Eirini P.; O'Malley, James; Kaji, Keisuke; Ko, Minoru S.H.; Ptashne, Mark; Brickman, Joshua M.

    2012-01-01

    Summary Oct4 is an essential regulator of pluripotency in vivo and in vitro in embryonic stem cells, as well as a key mediator of the reprogramming of somatic cells into induced pluripotent stem cells. It is not known whether activation and/or repression of specific genes by Oct4 is relevant to these functions. Here, we show that fusion proteins containing the coding sequence of Oct4 or Xlpou91 (the Xenopus homolog of Oct4) fused to activating regions, but not those fused to repressing regions, behave as Oct4, suppressing differentiation and promoting maintenance of undifferentiated phenotypes in vivo and in vitro. An Oct4 activation domain fusion supported embryonic stem cell self-renewal in vitro at lower concentrations than that required for Oct4 while alleviating the ordinary requirement for the cytokine LIF. At still lower levels of the fusion, LIF dependence was restored. We conclude that the necessary and sufficient function of Oct4 in promoting pluripotency is to activate specific target genes. PMID:22832160

  15. Falls in residential carpentry and drywall installation: findings from active injury surveillance with union carpenters.

    PubMed

    Lipscomb, Hester J; Dement, John M; Nolan, James; Patterson, Dennis; Li, Leiming; Cameron, Wilfred

    2003-08-01

    Active injury surveillance was conducted with a large, unionized workforce of residential and drywall carpenters over a 3-year period. Injured carpenters were interviewed by trained carpenter investigators and sites were visited where falls occurred. Qualitative information was collected on exposures, risk perception, training, and mentoring. Falls accounted for 20% of injuries. Same-level falls were often related to weather, carrying objects-sometimes with an obstructed view-housekeeping, terrain of the lot, and speed of work. Falls from height occurred from a variety of work surfaces and involved ladders, scaffolding, roofs, work on other unsecured surfaces, unprotected openings, speed, and weather conditions. Recognized fall protection strategies, such as guardrails, toe boards, tying off to appropriate anchors, and guarding openings, would have prevented many of these falls; these practices were not the norm on many sites.

  16. Regulation of Proteome Maintenance Gene Expression by Activators of Peroxisome Proliferator-Activated Receptor a (PPARa)

    EPA Science Inventory

    The nuclear receptor peroxisome proliferator-activated receptor alpha (PPARa) is activated by a large number of xenobiotic and hypolipidemic compounds called peroxisome proliferator chemicals (PPC). One agonist of PPARa (WY-14,643) regulates responses in the mouse liver to chemic...

  17. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  18. CAMKII activation is not required for maintenance of learning-induced enhancement of neuronal excitability.

    PubMed

    Liraz, Ori; Rosenblum, Kobi; Barkai, Edi

    2009-01-01

    Pyramidal neurons in the piriform cortex from olfactory-discrimination trained rats show enhanced intrinsic neuronal excitability that lasts for several days after learning. Such enhanced intrinsic excitability is mediated by long-term reduction in the post-burst after-hyperpolarization (AHP) which is generated by repetitive spike firing. AHP reduction is due to decreased conductance of a calcium-dependent potassium current, the sI(AHP). We have previously shown that learning-induced AHP reduction is maintained by persistent protein kinase C (PKC) and extracellular regulated kinase (ERK) activation. However, the molecular machinery underlying this long-lasting modulation of intrinsic excitability is yet to be fully described. Here we examine whether the CaMKII, which is known to be crucial in learning, memory and synaptic plasticity processes, is instrumental for the maintenance of learning-induced AHP reduction. KN93, that selectively blocks CaMKII autophosphorylation at Thr286, reduced the AHP in neurons from trained and control rat to the same extent. Consequently, the differences in AHP amplitude and neuronal adaptation between neurons from trained rats and controls remained. Accordingly, the level of activated CaMKII was similar in pirifrom cortex samples taken form trained and control rats. Our data show that although CaMKII modulates the amplitude of AHP of pyramidal neurons in the piriform cortex, its activation is not required for maintaining learning-induced enhancement of neuronal excitability.

  19. CAMKII Activation Is Not Required for Maintenance of Learning-Induced Enhancement of Neuronal Excitability

    PubMed Central

    Liraz, Ori; Rosenblum, Kobi; Barkai, Edi

    2009-01-01

    Pyramidal neurons in the piriform cortex from olfactory-discrimination trained rats show enhanced intrinsic neuronal excitability that lasts for several days after learning. Such enhanced intrinsic excitability is mediated by long-term reduction in the post-burst after-hyperpolarization (AHP) which is generated by repetitive spike firing. AHP reduction is due to decreased conductance of a calcium-dependent potassium current, the sIAHP. We have previously shown that learning-induced AHP reduction is maintained by persistent protein kinase C (PKC) and extracellular regulated kinase (ERK) activation. However, the molecular machinery underlying this long-lasting modulation of intrinsic excitability is yet to be fully described. Here we examine whether the CaMKII, which is known to be crucial in learning, memory and synaptic plasticity processes, is instrumental for the maintenance of learning-induced AHP reduction. KN93, that selectively blocks CaMKII autophosphorylation at Thr286, reduced the AHP in neurons from trained and control rat to the same extent. Consequently, the differences in AHP amplitude and neuronal adaptation between neurons from trained rats and controls remained. Accordingly, the level of activated CaMKII was similar in pirifrom cortex samples taken form trained and control rats. Our data show that although CaMKII modulates the amplitude of AHP of pyramidal neurons in the piriform cortex, its activation is not required for maintaining learning-induced enhancement of neuronal excitability. PMID:19172997

  20. Assembling and Installing LRUs for NIF

    SciTech Connect

    Bonanno, R E

    2003-12-31

    Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

  1. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  2. Brain Activation Patterns Associated with the Effects of Emotional Distracters during Working Memory Maintenance in Patients with Generalized Anxiety Disorder.

    PubMed

    Park, Jong-Il; Kim, Gwang-Won; Jeong, Gwang-Woo; Chung, Gyung Ho; Yang, Jong-Chul

    2016-01-01

    Few studies have assessed the neural mechanisms of the effects of emotion on cognition in generalized anxiety disorder (GAD) patients. In this functional MRI (fMRI), we investigated the effects of emotional interference on working memory (WM) maintenance in GAD patients. Fifteen patients with GAD participated in this study. Event-related fMRI data were obtained while the participants performed a WM task (face recognition) with neutral and anxiety-provoking distracters. The GAD patients showed impaired performance in WM task during emotional distracters and showed greater activation on brain regions such as DLPFC, VLPFC, amygdala, hippocampus which are responsible for the active maintenance of goal relevant information in WM and emotional processing. Although our results are not conclusive, our finding cautiously suggests the cognitive-affective interaction in GAD patients which shown interfering effect of emotional distracters on WM maintenance.

  3. Maintenance of Efficacy and Continuing Safety of Golimumab for Active Ulcerative Colitis: PURSUIT-SC Maintenance Study Extension Through 1 Year

    PubMed Central

    Gibson, Peter R; Feagan, Brian G; Sandborn, William J; Marano, Colleen; Strauss, Richard; Johanns, Jewel; Padgett, Lakshmi; Collins, Judith; Tarabar, Dino; Hebzda, Zbigniew; Rutgeerts, Paul; Reinisch, Walter

    2016-01-01

    Objectives: The safety and efficacy of subcutaneous golimumab through 2 years of maintenance therapy was evaluated in patients with moderate-to-severe ulcerative colitis (UC). Methods: Patients completing treatment through week 52 (placebo, golimumab 50, 100, every-4-weeks (q4w)) and evaluations at week 54 were eligible for this long-term extension (LTE) trial. Patients receiving placebo or golimumab 50 mg with worsening disease during the LTE could receive golimumab 100 mg. Efficacy assessments included the Mayo physician's global assessment (PGA) subscore, inflammatory bowel disease questionnaire (IBDQ), and corticosteroid use. Patients who were randomized to golimumab at PURSUIT-Maintenance baseline and continued receiving golimumab during the LTE were analyzed for efficacy (using intention-to-treat and “as observed” analyses; N=195) and safety (N=200). Patients treated with golimumab at any time from induction baseline through week 104 (N=1240) constituted the overall safety population. Results: Baseline demographics and disease characteristics of patients entering the LTE receiving golimumab were similar to those of all patients randomized to golimumab maintenance at baseline. At week 104, 80.5% (157/195) of patients had a PGA=0/1 (range weeks 56–104: 80.5–91.8%) and 56.4% (110/195) had a PGA=0 (weeks 56–104: range: 53.8–58.5%). Through week 104, 86% of patients maintained inactive or mild disease activity. Among 174 corticosteroid-free patients at week 54, 88.5% remained corticosteroid-free at week 104. At week 104, 62.2% (120/193) had an IBDQ score ≥170. Tuberculosis, opportunistic infection, and malignancy rates were low, and the overall safety profile was similar to that reported through week 54. Two non-melanoma skin cancers, one metastatic colon cancer, and two deaths (biventricular heart dysfunction, sepsis) occurred between weeks 54 and 104. Conclusion: Subcutaneous golimumab q4w through 2 years maintained clinical benefit and reduced

  4. Role of SUMO activating enzyme in cancer stem cell maintenance and self-renewal

    PubMed Central

    Du, Li; Li, Yi-Jia; Fakih, Marwan; Wiatrek, Rebecca L.; Duldulao, Marjun; Chen, Zhenbin; Chu, Peiguo; Garcia-Aguilar, Julio; Chen, Yuan

    2016-01-01

    Cancer stem cells (CSCs) have key roles in treatment resistance, tumour metastasis and relapse. Using colorectal cancer (CC) cell lines, patient-derived xenograft (PDX) tissues and patient tissues, here we report that CC CSCs, which resist chemoradiation, have higher SUMO activating enzyme (E1) and global SUMOylation levels than non-CSCs. Knockdown of SUMO E1 or SUMO conjugating enzyme (E2) inhibits CC CSC maintenance and self-renewal, while overexpression of SUMO E1 or E2 increases CC cell stemness. We found that SUMOylation regulates CSCs through Oct-1, a transcription factor for aldehyde dehydrogenases (ALDHs). ALDH activity is not only a marker for CSCs but also important in CSC biology. SUMO does not modify Oct-1 directly, but regulates the expression of TRIM21 that enhances Oct-1 ubiquitination and, consequently, reducing Oct-1 stability. In summary, our findings suggest that SUMOylation could be a target to inhibit CSCs and ultimately to reduce treatment resistance, tumour metastasis and relapse. PMID:27465491

  5. Using Visual Methods to Understand Physical Activity Maintenance following Cardiac Rehabilitation.

    PubMed

    Hardcastle, Sarah J; McNamara, Keira; Tritton, Larette

    2015-01-01

    Few studies have explored the factors associated with long-term maintenance of exercise following cardiac rehabilitation. The present study used auto-photography and interviews to explore the factors that influence motivation and continued participation in physical activity among post cardiac rehabilitation patients. Twenty-three semi-structured interviews were conducted alongside participant-selected photographs or drawings with participants that had continued participation in physical activity for at least two years following the cardiac rehabilitation programme. Participants were recruited from circuit training classes in East Sussex in the UK. Thematic content analysis revealed seven main themes: fear of death and ill health avoidance, critical incidents, overcoming aging, social influences, being able to enjoy life, provision of routine and structure, enjoyment and psychological well-being. Fear of death, illness avoidance, overcoming aging, and being able to enjoy life were powerful motives for continued participation in exercise. The social nature of the exercise class was also identified as a key facilitator of continued participation. Group-based exercise suited those that continued exercise participation post cardiac rehabilitation and fostered adherence.

  6. Evolutionarily conserved mechanisms for the selection and maintenance of behavioural activity

    PubMed Central

    Fiore, Vincenzo G.; Dolan, Raymond J.; Strausfeld, Nicholas J.; Hirth, Frank

    2015-01-01

    Survival and reproduction entail the selection of adaptive behavioural repertoires. This selection manifests as phylogenetically acquired activities that depend on evolved nervous system circuitries. Lorenz and Tinbergen already postulated that heritable behaviours and their reliable performance are specified by genetically determined programs. Here we compare the functional anatomy of the insect central complex and vertebrate basal ganglia to illustrate their role in mediating selection and maintenance of adaptive behaviours. Comparative analyses reveal that central complex and basal ganglia circuitries share comparable lineage relationships within clusters of functionally integrated neurons. These clusters are specified by genetic mechanisms that link birth time and order to their neuronal identities and functions. Their subsequent connections and associated functions are characterized by similar mechanisms that implement dimensionality reduction and transition through attractor states, whereby spatially organized parallel-projecting loops integrate and convey sensorimotor representations that select and maintain behavioural activity. In both taxa, these neural systems are modulated by dopamine signalling that also mediates memory-like processes. The multiplicity of similarities between central complex and basal ganglia suggests evolutionarily conserved computational mechanisms for action selection. We speculate that these may have originated from ancestral ground pattern circuitries present in the brain of the last common ancestor of insects and vertebrates. PMID:26554043

  7. Using Visual Methods to Understand Physical Activity Maintenance following Cardiac Rehabilitation

    PubMed Central

    Hardcastle, Sarah J.

    2015-01-01

    Few studies have explored the factors associated with long-term maintenance of exercise following cardiac rehabilitation. The present study used auto-photography and interviews to explore the factors that influence motivation and continued participation in physical activity among post cardiac rehabilitation patients. Twenty-three semi-structured interviews were conducted alongside participant-selected photographs or drawings with participants that had continued participation in physical activity for at least two years following the cardiac rehabilitation programme. Participants were recruited from circuit training classes in East Sussex in the UK. Thematic content analysis revealed seven main themes: fear of death and ill health avoidance, critical incidents, overcoming aging, social influences, being able to enjoy life, provision of routine and structure, enjoyment and psychological well-being. Fear of death, illness avoidance, overcoming aging, and being able to enjoy life were powerful motives for continued participation in exercise. The social nature of the exercise class was also identified as a key facilitator of continued participation. Group-based exercise suited those that continued exercise participation post cardiac rehabilitation and fostered adherence. PMID:26381147

  8. Notch pathway activation is essential for maintenance of stem-like cells in early tongue cancer

    PubMed Central

    Kaur, Ekjot; Aich, Jyotirmoi; Dani, Prachi; Sethunath, Vidyalakshmi; Gardi, Nilesh; Chandrani, Pratik; Godbole, Mukul; Sonawane, Kavita; Prasad, Ratnam; Kannan, Sadhana; Agarwal, Beamon; Kane, Shubhada; Gupta, Sudeep; Dutt, Shilpee; Dutt, Amit

    2016-01-01

    Background Notch pathway plays a complex role depending on cellular contexts: promotes stem cell maintenance or induces terminal differentiation in potential cancer-initiating cells; acts as an oncogene in lymphocytes and mammary tissue or plays a growth-suppressive role in leukemia, liver, skin, and head and neck cancer. Here, we present a novel clinical and functional significance of NOTCH1 alterations in early stage tongue squamous cell carcinoma (TSCC). Patients and Methods We analyzed the Notch signaling pathway in 68 early stage TSCC primary tumor samples by whole exome and transcriptome sequencing, real-time PCR based copy number, expression, immuno-histochemical, followed by cell based biochemical and functional assays. Results We show, unlike TCGA HNSCC data set, NOTCH1 harbors significantly lower frequency of inactivating mutations (4%); is somatically amplified; and, overexpressed in 31% and 37% of early stage TSCC patients, respectively. HNSCC cell lines over expressing NOTCH1, when plated in the absence of attachment, are enriched in stem cell markers and form spheroids. Furthermore, we show that inhibition of NOTCH activation by gamma secretase inhibitor or shRNA mediated knockdown of NOTCH1 inhibits spheroid forming capacity, transformation, survival and migration of the HNSCC cells suggesting an oncogenic role of NOTCH1 in TSCC. Clinically, Notch pathway activation is higher in tumors of non-smokers compared to smokers (50% Vs 18%, respectively, P=0.026) and is also associated with greater nodal positivity compared to its non-activation (93% Vs 64%, respectively, P=0.029). Conclusion We anticipate that these results could form the basis for therapeutic targeting of NOTCH1 in tongue cancer. PMID:27391340

  9. Supporting activity engagement by family carers at home: maintenance of agency and personhood in dementia

    PubMed Central

    Chung, Pat Yin Fan; Ellis-Hill, Caroline; Coleman, Peter

    2017-01-01

    ABSTRACT An explorative paper to describe how family carers, through the caregiving journey, reaffirm and promote the agency of people with dementia. Agency is an important concept in dementia care and is crucial to the promotion of wellbeing and the delivery of person-centred care. This article is based on one of the key findings of a study that explored family carers’ experiences of engaging their relatives in daily activities in domestic settings. Following research governance and ethical approval, 30 in-depth interviews (initial and follow-up) were carried out with 15 resident-carers of people with dementia who were recruited via local community mental health teams. Then five focus groups were conducted with 21 participants accessed through carers support groups. Interviews and focus groups were transcribed, coded and analysed using a grounded theory method. Findings showed the process in which family carers encouraged and sustained a sense of autonomy and control (agency) in their relative’s daily activities. Key strategies used by carers included: being non-judgemental; facilitating a sense of worth; taking calculated risks; maintaining the continuity of their relative’s identity; enhancing a sense of connection with their relative’s role and identity using enjoyable activities; preventing inactivity and attending to the bodily source of the agency. Lack of support for carers could ultimately pose a risk to the maintenance of the agency of people with dementia. This study provides a deeper insight into the process used by home carers to support the agency of people with dementia. This is essential if practitioners are to identify and develop more realistic intervention strategies and to work in effective partnership with family carers. The implications for the creation of dementia-friendly communities are discussed.

  10. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  11. NODULES WITH ACTIVATED DEFENSE 1 is required for maintenance of rhizobial endosymbiosis in Medicago truncatula.

    PubMed

    Wang, Chao; Yu, Haixiang; Luo, Li; Duan, Liujian; Cai, Liuyang; He, Xinxing; Wen, Jiangqi; Mysore, Kirankumar S; Li, Guoliang; Xiao, Aifang; Duanmu, Deqiang; Cao, Yangrong; Hong, Zonglie; Zhang, Zhongming

    2016-10-01

    The symbiotic interaction between legume plants and rhizobia results in the formation of root nodules, in which symbiotic plant cells host and harbor thousands of nitrogen-fixing rhizobia. Here, a Medicago truncatula nodules with activated defense 1 (nad1) mutant was identified using reverse genetics methods. The mutant phenotype was characterized using cell and molecular biology approaches. An RNA-sequencing technique was used to analyze the transcriptomic reprogramming of nad1 mutant nodules. In the nad1 mutant plants, rhizobial infection and propagation in infection threads are normal, whereas rhizobia and their symbiotic plant cells become necrotic immediately after rhizobia are released from infection threads into symbiotic cells of nodules. Defense-associated responses were detected in nad1 nodules. NAD1 is specifically present in root nodule symbiosis plants with the exception of Morus notabilis, and the transcript is highly induced in nodules. NAD1 encodes a small uncharacterized protein with two predicted transmembrane helices and is localized at the endoplasmic reticulum. Our data demonstrate a positive role for NAD1 in the maintenance of rhizobial endosymbiosis during nodulation.

  12. Maintenance of neuronal size gradient in MNTB requires sound-evoked activity

    PubMed Central

    Weatherstone, Jessica H.; Pilati, Nadia; Wang, Yuan; Forsythe, Ian D.; Rubel, Edwin W.; Tempel, Bruce L.

    2016-01-01

    The medial nucleus of the trapezoid body (MNTB) is an important source of inhibition during the computation of sound location. It transmits fast and precisely timed action potentials at high frequencies; this requires an efficient calcium clearance mechanism, in which plasma membrane calcium ATPase 2 (PMCA2) is a key component. Deafwaddler (dfw2J) mutant mice have a null mutation in PMCA2 causing deafness in homozygotes (dfw2J/dfw2J) and high-frequency hearing loss in heterozygotes (+/dfw2J). Despite the deafness phenotype, no significant differences in MNTB volume or cell number were observed in dfw2J homozygous mutants, suggesting that PMCA2 is not required for MNTB neuron survival. The MNTB tonotopic axis encodes high to low sound frequencies across the medial to lateral dimension. We discovered a cell size gradient along this axis: lateral neuronal somata are significantly larger than medially located somata. This size gradient is decreased in +/dfw2J and absent in dfw2J/dfw2J. The lack of acoustically driven input suggests that sound-evoked activity is required for maintenance of the cell size gradient. This hypothesis was corroborated by selective elimination of auditory hair cell activity with either hair cell elimination in Pou4f3 DTR mice or inner ear tetrodotoxin (TTX) treatment. The change in soma size was reversible and recovered within 7 days of TTX treatment, suggesting that regulation of the gradient is dependent on synaptic activity and that these changes are plastic rather than permanent. NEW & NOTEWORTHY Neurons of the medial nucleus of the trapezoid body (MNTB) act as fast-spiking inhibitory interneurons within the auditory brain stem. The MNTB is topographically organized, with low sound frequencies encoded laterally and high frequencies medially. We discovered a cell size gradient along this axis: lateral neurons are larger than medial neurons. The absence of this gradient in deaf mice lacking plasma membrane calcium ATPase 2 suggests an

  13. Maintenance of neuronal size gradient in MNTB requires sound-evoked activity.

    PubMed

    Weatherstone, Jessica H; Kopp-Scheinpflug, Conny; Pilati, Nadia; Wang, Yuan; Forsythe, Ian D; Rubel, Edwin W; Tempel, Bruce L

    2017-02-01

    The medial nucleus of the trapezoid body (MNTB) is an important source of inhibition during the computation of sound location. It transmits fast and precisely timed action potentials at high frequencies; this requires an efficient calcium clearance mechanism, in which plasma membrane calcium ATPase 2 (PMCA2) is a key component. Deafwaddler (dfw(2J) ) mutant mice have a null mutation in PMCA2 causing deafness in homozygotes (dfw(2J) /dfw(2J) ) and high-frequency hearing loss in heterozygotes (+/dfw(2J) ). Despite the deafness phenotype, no significant differences in MNTB volume or cell number were observed in dfw(2J) homozygous mutants, suggesting that PMCA2 is not required for MNTB neuron survival. The MNTB tonotopic axis encodes high to low sound frequencies across the medial to lateral dimension. We discovered a cell size gradient along this axis: lateral neuronal somata are significantly larger than medially located somata. This size gradient is decreased in +/dfw(2J) and absent in dfw(2J) /dfw(2J) The lack of acoustically driven input suggests that sound-evoked activity is required for maintenance of the cell size gradient. This hypothesis was corroborated by selective elimination of auditory hair cell activity with either hair cell elimination in Pou4f3 DTR mice or inner ear tetrodotoxin (TTX) treatment. The change in soma size was reversible and recovered within 7 days of TTX treatment, suggesting that regulation of the gradient is dependent on synaptic activity and that these changes are plastic rather than permanent.NEW & NOTEWORTHY Neurons of the medial nucleus of the trapezoid body (MNTB) act as fast-spiking inhibitory interneurons within the auditory brain stem. The MNTB is topographically organized, with low sound frequencies encoded laterally and high frequencies medially. We discovered a cell size gradient along this axis: lateral neurons are larger than medial neurons. The absence of this gradient in deaf mice lacking plasma membrane calcium ATPase 2

  14. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  15. RACK1 promotes maintenance of morphine-associated memory via activation of an ERK-CREB dependent pathway in hippocampus.

    PubMed

    Liu, Litao; Zhu, Jiejun; Zhou, Liming; Wan, Lihong

    2016-02-02

    Existence of long-term drug-associated memories may be a crucial factor in drug cravings and relapse. RACK1 plays a critical role in morphine-induced reward. In the present study, we used conditioned place preference (CPP) to assess the acquisition and maintenance of morphine conditioned place preference memory. The hippocampal protein level of RACK1 and synaptic quantitation were evaluated by Western blotting, immunohistochemistry and electron microscopy, respectively. Additionally, shRACK1 (shGnb2l1) was used to silence RACK1 in vivo to evaluate the role and the underlying mechanism of RACK1 in maintenance of morphine CPP memory. We found that morphine induced CPP was maintained for at least 7 days after the last morphine treatment, which indicated a positive correlation with hippocampal RACK1 level, and was accompanied simultaneously by increases in the synapse density and hippocampal expression of synaptophysin (SYP), phosphorylation of extracellular signal-regulated kinase1/2 (pERK1/2) and the phosphorylation of cyclic adenosine monophosphate response element-binding (pCREB). ShGnb2l1 icv injection significantly suppressed the expression of all above proteins, decreased the synapse density in the hippocampus and attenuated the acquisition and maintenance of morphine CPP. Our present study highlights that RACK1 plays an important role in the maintenance of morphine CPP, likely via activation of ERK-CREB pathway in hippocampus.

  16. Periodontal maintenance.

    PubMed

    Tan, A E S

    2009-09-01

    The main goal of periodontal therapy is to establish an oral environment compatible with periodontal health by the physical disruption of the plaque biofilm and adjunctive chemical means if required. Implicit in this objective is the ongoing requirement of detection and interception of new and recurrent disease, which continues at selected intervals for the life of the dentition after the initial ("active") phase of periodontal treatment. This concept of ongoing periodontal maintenance therapy has been embraced as the mandatory requirement for favourable periodontal outcomes based on institutional clinical trials and in practice-based studies in various parts of the world. This review examines the ramifications of periodontal maintenance therapy based upon a multi-level assessment of logistic issues and risk factors at three levels: (1) The patient level - treatment time; patient attendance compliance; and homecare measures, antiseptics/antibiotics and smoking. (2) The level of the individual tooth - tooth loss; and evaluation of success versus survival. (3) The level of each tooth surface ("site") - probing depth, loss of attachment and bleeding on probing; and changes in clinical attachment levels. In spite of the diversity of studies conducted, there is agreement on the efficacy of periodontal maintenance therapy when compared with studies on untreated populations and in treated cases that were not maintained.

  17. 24 CFR 35.1220 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Ongoing lead-based paint..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Tenant-Based Rental Assistance § 35.1220 Ongoing lead-based paint maintenance...

  18. 24 CFR 35.1220 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Ongoing lead-based paint..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Tenant-Based Rental Assistance § 35.1220 Ongoing lead-based paint maintenance...

  19. 24 CFR 35.1220 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Ongoing lead-based paint..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Tenant-Based Rental Assistance § 35.1220 Ongoing lead-based paint maintenance...

  20. 24 CFR 35.1220 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Ongoing lead-based paint..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Tenant-Based Rental Assistance § 35.1220 Ongoing lead-based paint maintenance...

  1. 24 CFR 35.1220 - Ongoing lead-based paint maintenance activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Ongoing lead-based paint..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Tenant-Based Rental Assistance § 35.1220 Ongoing lead-based paint maintenance...

  2. Institutional Maintenance Management and Services. Student Activity Book [and] Reference Book.

    ERIC Educational Resources Information Center

    Koukel, Sonja D.

    These publications are two of three that comprise a course that provides occupationally specific training designed to develop knowledge and skills for employment in the area of institutional maintenance management and services. The reference book is a student text that provides information needed by employees in the institutional maintenance…

  3. Physical activity maintenance among Spanish-speaking Latinas in a randomized controlled trial of an Internet-based intervention.

    PubMed

    Hartman, Sheri J; Dunsiger, Shira I; Bock, Beth C; Larsen, Britta A; Linke, Sarah; Pekmezi, Dori; Marquez, Becky; Gans, Kim M; Mendoza-Vasconez, Andrea S; Marcus, Bess H

    2016-10-17

    Spanish-speaking Latinas have some of the lowest rates of meeting physical activity guidelines in the U.S. and are at high risk for many related chronic diseases. The purpose of the current study was to examine the maintenance of a culturally and individually-tailored Internet-based physical activity intervention for Spanish-speaking Latinas. Inactive Latinas (N  =  205) were randomly assigned to a 6-month Tailored Physical Activity Internet Intervention or a Wellness Contact Control Internet Group, with a 6-month follow-up. Maintenance was measured by assessing group differences in minutes per week of self-reported and accelerometer measured moderate to vigorous physical activity (MVPA) at 12 months after baseline and changes in MVPA between the end of the active intervention (month 6) and the end of the study (month 12). Potential moderators of the intervention were also examined. Data were collected between 2011 and 2014, and were analyzed in 2015 at the University of California, San Diego. The Intervention Group engaged in significantly more minutes of MVPA per week than the Control Group at the end of the maintenance period for both self-reported (mean diff. = 30.68, SE = 11.27, p = .007) and accelerometer measured (mean diff. = 11.47, SE = 3.19, p = .01) MVPA. There were no significant between- or within-group changes in MVPA from month 6 to 12. Greater intervention effects were seen for those with lower BMI (BMI × intervention = -6.67, SE = 2.88, p = .02) and lower perceived places to walk to in their neighborhood (access × intervention = -43.25, SE = 19.07, p = .02), with a trend for less family support (social support × intervention = -3.49, SE = 2.05, p = .08). Acculturation, health literacy, and physical activity related psychosocial variables were not significant moderators of the intervention effect during the maintenance period. Findings from the current study support the efficacy of an Internet

  4. Annual report on surveillance and maintenance activities at Oak Ridge National Laboratory, Oak Ridge, Tennessee, fiscal year 1996

    SciTech Connect

    1996-11-01

    In fiscal year (FY) 1995, the sites and facilities from both the Remedial Action (RA) and Decontamination and Decommissioning (D and D) programs were combined to form the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program. Surveillance and Maintenance activities were conducted throughout FY 1996 at the RA facilities. Overall, the RA S and M Program consists of approximately 650 acres that include 14 waste area groupings with approximately 200 sites. These sites include 46 major facilities, several leak and contaminated soil sites, 38 inactive tanks, approximately 50 environmental study areas and approximately 2,973 wells and boreholes. Site inspections were conducted at established frequencies on appropriate sites in the RA S and M Program in accordance with the established S and M FY 1996 Incentive Task Order (ITO).

  5. Essential role of lncRNA binding for WDR5 maintenance of active chromatin and embryonic stem cell pluripotency

    PubMed Central

    Yang, Yul W; Flynn, Ryan A; Chen, Yong; Qu, Kun; Wan, Bingbing; Wang, Kevin C; Lei, Ming; Chang, Howard Y

    2014-01-01

    The WDR5 subunit of the MLL complex enforces active chromatin and can bind RNA; the relationship between these two activities is unclear. Here we identify a RNA binding pocket on WDR5, and discover a WDR5 mutant (F266A) that selectively abrogates RNA binding without affecting MLL complex assembly or catalytic activity. Complementation in ESCs shows that WDR5 F266A mutant is unable to accumulate on chromatin, and is defective in gene activation, maintenance of histone H3 lysine 4 trimethylation, and ESC self renewal. We identify a family of ESC messenger and lncRNAs that interact with wild type WDR5 but not F266A mutant, including several lncRNAs known to be important for ESC gene expression. These results suggest that specific RNAs are integral inputs into the WDR5-MLL complex for maintenance of the active chromatin state and embryonic stem cell fates. DOI: http://dx.doi.org/10.7554/eLife.02046.001 PMID:24521543

  6. Twelve years of repeated wild hog activity promotes population maintenance of an invasive clonal plant in a coastal dune ecosystem.

    PubMed

    Oldfield, Callie A; Evans, Jonathan P

    2016-04-01

    Invasive animals can facilitate the success of invasive plant populations through disturbance. We examined the relationship between the repeated foraging disturbance of an invasive animal and the population maintenance of an invasive plant in a coastal dune ecosystem. We hypothesized that feral wild hog (Sus scrofa) populations repeatedly utilized tubers of the clonal perennial, yellow nutsedge (Cyperus esculentus) as a food source and evaluated whether hog activity promoted the long-term maintenance of yellow nutsedge populations on St. Catherine's Island, Georgia, United States. Using generalized linear mixed models, we tested the effect of wild hog disturbance on permanent sites for yellow nutsedge culm density, tuber density, and percent cover of native plant species over a 12-year period. We found that disturbance plots had a higher number of culms and tubers and a lower percentage of native live plant cover than undisturbed control plots. Wild hogs redisturbed the disturbed plots approximately every 5 years. Our research provides demographic evidence that repeated foraging disturbances by an invasive animal promote the long-term population maintenance of an invasive clonal plant. Opportunistic facultative interactions such as we demonstrate in this study are likely to become more commonplace as greater numbers of introduced species are integrated into ecological communities around the world.

  7. Active dc filter for HVDC system--A test installation in the Konti-Skan DC link at Lindome converter station

    SciTech Connect

    Zhang, Wenyan; Asplund, G. . HVDC Division); Aberg, A. . Dept. of Man-Machine Communication); Jonsson, U. ); Loeoef, O. . Region Vaestsverige)

    1993-07-01

    The purpose of introducing active dc filters is to meet the more and more stringent requirement from power utilities on limiting telephone interference caused by harmonic currents from HVdc transmission lines, without unnecessarily increasing the cost of HVdc stations. An active dc filter installed in the Konti-Skan HVdc link is described. The active dc filter is connected at the bottom of an existing passive dc filter at the Lindome station. The active dc filter includes optic harmonic current measuring unit, control system, protection and supervision system, PWM power amplifier, high-frequency transformer, surge arrester, and coupling apparatuses. The active dc filter has small physical size and occupies small ground area. The performance of the active dc filter for eliminating the disturbing harmonics is excellent. To achieve comparable results by passive filters would require something like ten times more high voltage equipment.

  8. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Transportation Facility Maintenance Management System (TFMMS). 16. Performing pavement maintenance such as pot... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt....

  9. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    SciTech Connect

    1995-11-01

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ``Remedial Action Surveillance and Maintenance``). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs.

  10. Telomerase redefined: integrated regulation of hTR and hTERT for telomere maintenance and telomerase activity.

    PubMed

    Cairney, C J; Keith, W N

    2008-01-01

    Telomerase activity is dependent on the expression of 2 main core component genes, hTERT, which encodes the catalytic component and hTR (also called TERC), which encodes the RNA component. The correlation between telomerase activity and carcinogenesis has made this molecule of great interest in cancer research, however in order to fully understand the regulation of telomerase the mechanisms controlling both telomerase genes need to be studied. Some of these mechanisms of regulation have begun to emerge, however many more remain to be deciphered. For many years hTERT has been regarded as the limiting component of telomerase and much of the research in this field has focussed on its regulation, however it was clear from an early stage that hTR expression was also tightly regulated in normal cells and disease. More recently evidence from biochemistry, promoter studies and mouse models has been steadily increasing for a role for hTR as a limiting and essential component for telomerase activity and telomere maintenance. Perhaps the time has come to redefine our view of telomerase regulation. Knowledge of the mechanisms controlling both telomerase genes in normal systems and cancer may aid our understanding of the role of telomerase in carcinogenesis or highlight potential areas for therapeutic intervention. Here we review the essential requirement of hTR for telomere maintenance and telomerase activity in normal tissues and disease and focus on recent advances in our understanding of hTR regulation in relation to hTERT.

  11. Phosphorylation of Minichromosome Maintenance 3 (MCM3) by Checkpoint Kinase 1 (Chk1) Negatively Regulates DNA Replication and Checkpoint Activation.

    PubMed

    Han, Xiangzi; Mayca Pozo, Franklin; Wisotsky, Jacob N; Wang, Benlian; Jacobberger, James W; Zhang, Youwei

    2015-05-08

    Mechanisms controlling DNA replication and replication checkpoint are critical for the maintenance of genome stability and the prevention or treatment of human cancers. Checkpoint kinase 1 (Chk1) is a key effector protein kinase that regulates the DNA damage response and replication checkpoint. The heterohexameric minichromosome maintenance (MCM) complex is the core component of mammalian DNA helicase and has been implicated in replication checkpoint activation. Here we report that Chk1 phosphorylates the MCM3 subunit of the MCM complex at Ser-205 under normal growth conditions. Mutating the Ser-205 of MCM3 to Ala increased the length of DNA replication track and shortened the S phase duration, indicating that Ser-205 phosphorylation negatively controls normal DNA replication. Upon replicative stress treatment, the inhibitory phosphorylation of MCM3 at Ser-205 was reduced, and this reduction was accompanied with the generation of single strand DNA, the key platform for ataxia telangiectasia mutated and Rad3-related (ATR) activation. As a result, the replication checkpoint is activated. Together, these data provide significant insights into the regulation of both normal DNA replication and replication checkpoint activation through the novel phosphorylation of MCM3 by Chk1.

  12. Ritodrine in Oral Maintenance of Tocolysis after Active Preterm Labor: Randomized Controlled Trial

    PubMed Central

    Matijević, Ratko; Grgić, Ozren; Vasilj, Oliver

    2006-01-01

    Aim To assess the efficacy of oral ritodrine in the form of sustained-release capsules for maintenance of uterine quiescence after successful treatment of threatened preterm labor. Methods We randomized 120 women with singleton pregnancy who were successfully treated for threatened preterm labor before 34 completed weeks to receive either maintenance tocolysis with two 40 mg ritodrine sustained release capsules three times a day (study group, n = 62) or no treatment (control group, n = 58) for three days. The primary outcome measure was the recurrent episode of threatened preterm labor within 72 hours, which was defined as regular palpable uterine contractions and change in cervical effacement or cervical dilatation on clinical examination. Secondary outcome measures included the incidence of preterm birth, neonatal adverse outcomes, and maternal side effects. Results There was no difference in the frequency of recurrent episodes of threatened preterm labor requiring another course of intravenous treatment between the study (8/62) and control (6/58) group of women (P = 0.879). No differences were found between the study and control groups in any of the predefined secondary outcome measures, ie, delivery before 37 weeks (13/62 vs 7/58, respectively; P = 0.288), delivery before 34 weeks (3/62 vs 1/58, respectively; P = 0.682) and birth weight (3037 ± 573 g vs 3223 ± 423 g, respectively, P = 0.862). There were more reported maternal side effects in the study group than in control group (47/62 vs 23/58, respectively; P<0.001). Conclusions Additional maintenance ritodrine therapy was unnecessary in women with singleton pregnancy who had an episode of threatened preterm labor successfully treated with intravenous tocolytic therapy. Clinical Trial Registration ClinicalTrials.gov Identifier: NCT00290173 PMID:16489694

  13. A framework for the design of a voice-activated, intelligent, and hypermedia-based aircraft maintenance manual

    NASA Astrophysics Data System (ADS)

    Patankar, Manoj Shashikant

    Federal Aviation Regulations require Aviation Maintenance Technicians (AMTs) to refer to approved maintenance manuals when performing maintenance on airworthy aircraft. Because these manuals are paper-based, larger the size of the aircraft, more cumbersome are the manuals. Federal Aviation Administration (FAA) recognized the difficulties associated with the use of large manuals and conducted studies on the use of electronic media as an alternative to the traditional paper format. However, these techniques do not employ any artificial intelligence technologies and the user interface is limited to either a keyboard or a stylus pen. The primary emphasis of this research was to design a generic framework that would allow future development of voice-activated, intelligent, and hypermedia-based aircraft maintenance manuals. A prototype (VIHAMS-Voice-activated, Intelligent, and Hypermedia-based Aircraft Maintenance System) was developed, as a secondary emphasis, using the design and development techniques that evolved from this research. An evolutionary software design approach was used to design the proposed framework and the structured rapid prototyping technique was used to produce the VIHAMS prototype. VoiceAssist by Creative Labs was used to provide the voice interface so that the users (AMTs) could keep their hands free to work on the aircraft while maintaining complete control over the computer through discrete voice commands. KnowledgePro for Windows sp{TM}, an expert system shell, provided "intelligence" to the prototype. As a result of this intelligence, the system provided expert guidance to the user. The core information contained in conventional manuals was available in a hypermedia format. The prototype's operating hardware included a notebook computer with a fully functional audio system. An external microphone and the built-in speaker served as the input and output devices (along with the color monitor), respectively. Federal Aviation Administration

  14. Maintenance and induction of naphthalene degradation activity in Pseudomonas putida and an Alcaligenes sp. under different culture conditions.

    PubMed

    Guerin, W F; Boyd, S A

    1995-11-01

    The expression of xenobiotic-degradative genes in indigenous bacteria or in bacteria introduced into an ecosystem is essential for the successful bioremediation of contaminated environments. The maintenance of naphthalene utilization activity is studied in Pseudomonas putida (ATCC 17484) and an Alcaligenes sp. (strain NP-Alk) under different batch culture conditions. Levels of activity decreased exponentially in stationary phase with half-lives of 43 and 13 h for strains ATCC 17484 and NP-Alk, respectively. Activity half-lives were 2.7 and 5.3 times longer, respectively, in starved cultures than in stationary-phase cultures following growth on naphthalene. The treatment of starved cultures with chloramphenicol caused a loss of activity more rapid than that measured in untreated starved cultures, suggesting a continued enzyme synthesis in starved cultures in the absence of a substrate. Following growth in nutrient medium, activity decreased to undetectable levels in the Alcaligenes sp. but remained at measurable levels in the pseudomonad even after 9 months. The induction of naphthalene degradation activities in these cultures, when followed by radiorespirometry with 14C-labeled naphthalene as the substrate, was consistent with activity maintenance data. In the pseudomonad, naphthalene degradation activity was present constitutively at low levels under all growth conditions and was rapidly (in approximately 15 min) induced to high levels upon exposure to naphthalene. Adaptation in the uninduced Alcaligenes sp. occurred after many hours of exposure to naphthalene. In vivo labeling with 35S, to monitor the extent of de novo enzyme synthesis by naphthalene-challenged cells, provided an independent confirmation of the results.

  15. Maintenance and induction of naphthalene degradation activity in Pseudomonas putida and an Alcaligenes sp. under different culture conditions

    SciTech Connect

    Guerin, W.F.; Boyd, S.A.

    1995-11-01

    The expression of xenobiotic-degradative genes in indigenous bacteria or in bacteria introduced into an ecosystem is essential for the successful bioremediation of contaminated environments. The maintenance of naphthalene utilization activity is studied in Pseudomonas putida (ATCC 17484) and an Alcaligenes sp. (strain NP-Alk) under different batch culture conditions. Levels of activity decreased exponentially in stationary phase with half-lives of 43 and 13 h for strains ATCC 17484 nad NP-Alk, respectively. Activity half-lives were 2.7 and 5.3 times longer, respectively, in starved cultures than in stationary-phase cultures following growth on naphthalene. The treatment of starved cultures with chloramphenicol caused a loss of activity more rapid than that measured in untreated starved cultures, suggesting a continued enzyme synthesis in starved cultures in the absence of a substrate. Following growth in nutrient medium, activity decreased to undetectable levels in the Alcaligenes sp. but remained at measureable levels int he pseudomonad even after 9 months. The induction of naphthalene degradation activities in these cultures, when followed by radiorespirometry with {sup 14}C-labeled naphthalene as the substrate, was consistent with activity maintenance data. In the pseudomonad, naphthalene degradation activity was present constitutively at low levels under all growth conditions and was rapidly (in approximately 15 min) induced to high levels upon exposure to naphthalene. Adaptation in the uninduced Alcaligenes sp. occurred after many hours of exposure to naphthalene. In vivo labeling with {sup 35}S, to monitor the extent of de novo enzyme synthesis by naphthalene-challenged cells, provided an independent confirmation of the results. 43 refs., 9 figs., 1 tab.

  16. Observations of the Behavior and Distribution of Fish in Relation to the Columbia River Navigation Channel and Channel Maintenance Activities

    SciTech Connect

    Carlson, Thomas J.; Ploskey, Gene R.; Johnson, R. L.; Mueller, Robert P.; Weiland, Mark A.; Johnson, P. N.

    2001-10-19

    This report is a compilation of 7 studies conducted for the U.S. Army Corps of Engineers between 1995 and 1998 which used hydroacoustic methods to study the behavior of migrating salmon in response to navigation channel maintenance activities in the lower Columbia River near river mile 45. Differences between daytime and nighttime behavior and fish densities were noted. Comparisons were made of fish distribution across the river (in the channel, channel margin or near shore) and fish depth upstream and downstream of dikes, dredges, and pile driving areas.

  17. Design and installation manual for thermal energy storage

    NASA Astrophysics Data System (ADS)

    Cole, R. L.; Nield, K. J.; Rohde, R. R.; Wolosewicz, R. M.

    1980-01-01

    The design and installation of thermal energy storage in active solar systems is discussed. Both air based and liquid based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single-, and dual-tank systems, domestic water heating with air and liquid based space heating systems, and stand alone domestics hot water systems. Also examined are common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass reinforced plastic tanks.

  18. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  19. Aircraft Electronics Maintenance Training Simulator. Curriculum Outlines.

    ERIC Educational Resources Information Center

    Blackhawk Technical Coll., Janesville, WI.

    Instructional materials are provided for nine courses in an aircraft electronics maintenance training program. Courses are as follows: aviation basic electricity, direct current and alternating current electronics, basic avionic installations, analog electronics, digital electronics, microcomputer electronics, radio communications, aircraft…

  20. Installation package for a solar-heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Package consists of installation, operation and maintenance manuals for four commercial solar energy subsystems, including flat plate solar collector pebble bed thermal-storage. Manual gives design information, sizing data, specification drawings, and other material for subsystem.

  1. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    SciTech Connect

    Not Available

    1994-11-01

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments.

  2. United States Air Force Analysis Extract, AFSC 2MOX2 - AD, Missile and Space Systems Maintenance, Active Duty, OSSN 2522

    DTIC Science & Technology

    2003-08-01

    5 7 8 F0498 Remove or install MOD VII launch support systems 1 4 3 3 4 8 ( LSSs ) cables...0 2 1 2 4 ( LSSs ) cables F0499 Remove or install operational or modified base adapter 0 0 0...missile instrumentation cables 0 F0498 Remove or install MOD VII launch support systems 1 ( LSSs

  3. Early Life Manipulations of the Nonapeptide System Alter Pair Maintenance Behaviors and Neural Activity in Adult Male Zebra Finches

    PubMed Central

    Baran, Nicole M.; Tomaszycki, Michelle L.; Adkins-Regan, Elizabeth

    2016-01-01

    Adult zebra finches (T. guttata) form socially monogamous pair bonds characterized by proximity, vocal communication, and contact behaviors. In this experiment, we tested whether manipulations of the nonapeptide hormone arginine vasotocin (AVT, avian homolog of vasopressin) and the V1a receptor (V1aR) early in life altered species-typical pairing behavior in adult zebra finches of both sexes. Although there was no effect of treatment on the tendency to pair in either sex, males in different treatments exhibited profoundly different profiles of pair maintenance behavior. Following a brief separation, AVT-treated males were highly affiliative with their female partner but sang very little compared to Controls. In contrast, males treated with a V1aR antagonist sang significantly less than Controls, but did not differ in affiliation. These effects on behavior in males were also reflected in changes in the expression of V1aR and immediate early gene activity in three brain regions known to be involved in pairing behavior in birds: the medial amygdala, medial bed nucleus of the stria terminalis, and the lateral septum. AVT males had higher V1aR expression in the medial amygdala than both Control and antagonist-treated males and immediate early gene activity of V1aR neurons in the medial amygdala was positively correlated with affiliation. Antagonist treated males showed decreased activity in the medial amygdala. In addition, there was a negative correlation between the activity of V1aR cells in the medial bed nucleus of the stria terminalis and singing. Treatment also affected the expression of V1aR and activity in the lateral septum, but this was not correlated with any behaviors measured. These results provide evidence that AVT and V1aR play developmental roles in specific pair maintenance behaviors and the neural substrate underlying these behaviors in a bird. PMID:27065824

  4. Examining maintenance responsibilities.

    PubMed

    Lam, K C

    2001-06-01

    This paper has examined the important responsibilities of the two organisations involved in the provision of maintenance service for the vital building services in many of our highly serviced buildings. The issues raised could be put to beneficial use in both clients and maintenance providers. All in all, the clients should work closely with their maintenance providers. Engineering services in buildings will not perform satisfactorily and efficiently if both parties do not work together and understand the maintenance tasks based on a business partnering mode. Put forward is the view that the management of the activities involved in the operation and maintenance process is a "shared commitment/involvement" between the client and the maintenance provider. It is obvious that many factors can influence the continued effectiveness of a quality maintenance scheme set up by client and provider. Some of these factors are: Change in key personnel Updates in technology Amendments to engineering practice Implementation of legislative requirements Changes in operation by client or provider Change of use of building Passage of time These factors must be fully reviewed by both parties from time to time, and necessary actions taken. A cooperative team working relationship and improved communication should be fostered by the client and his provider for the best management of services maintenance. This arrangement will contribute to better building services systems with continuous improvement; improved value for clients and higher return for the maintenance provider.

  5. Maintenance of photovoltaic power systems

    NASA Astrophysics Data System (ADS)

    Hall, M. R.

    1984-08-01

    This publication establishes standard practices for inspection, testing, and maintenance of photovoltaic power systems at Dept. of the Navy installations. The practices and procedures are recommended to ensure reliable operation of the power systems. The manual covers photovoltaic-array, battery, voltage-regulator, inverter, and wiring subsystems. In addition, this manual provides a troubleshooting guide and self-study questions and answers.

  6. Installation package for a solar heating and hot water system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  7. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  8. Maintenance of leukemic cell identity by the activity of the Polycomb complex PRC1 in mice

    PubMed Central

    Rossi, Alessandra; Ferrari, Karin J.; Piunti, Andrea; Jammula, SriGanesh; Chiacchiera, Fulvio; Mazzarella, Luca; Scelfo, Andrea; Pelicci, Pier Giuseppe; Pasini, Diego

    2016-01-01

    Leukemia is a complex heterogeneous disease often driven by the expression of oncogenic fusion proteins with different molecular and biochemical properties. Whereas several fusion proteins induce leukemogenesis by activating Hox gene expression (Hox-activating fusions), others impinge on different pathways that do not involve the activation of Hox genes (non–Hox-activating fusions). It has been postulated that one of the main oncogenic properties of the HOXA9 transcription factor is its ability to control the expression of the p16/p19 tumor suppressor locus (Cdkn2a), thereby compensating Polycomb-mediated repression, which is dispensable for leukemias induced by Hox-activating fusions. We show, by genetically depleting the H2A ubiquitin ligase subunits of the Polycomb repressive complex 1 (PRC1), Ring1a and Ring1b, that Hoxa9 activation cannot repress Cdkn2a expression in the absence of PRC1 and its dependent deposition of H2AK119 monoubiquitination (H2AK119Ub). This demonstrates the essential role of PRC1 activity in supporting the oncogenic potential of Hox-activating fusion proteins. By combining genetic tools with genome-wide location and transcription analyses, we further show that PRC1 activity is required for the leukemogenic potential of both Hox-activating and non–Hox-activating fusions, thus preventing the differentiation of leukemic cells independently of the expression of the Cdkn2a locus. Overall, our results genetically demonstrate that PRC1 activity and the deposition of H2AK119Ub are critical factors that maintain the undifferentiated identity of cancer cells, positively sustaining the progression of different types of leukemia. PMID:27730210

  9. Sustained activation of STAT5 is essential for chromatin remodeling and maintenance of mammary-specific function

    SciTech Connect

    Xu, Ren; Nelson, Celeste M.; Muschler, John L.; Veiseh, Mandana; Vonderhaar, Barbara K.; Bissell, Mina J.

    2009-06-03

    Epithelial cells, once dissociated and placed in two-dimensional (2D) cultures, rapidly lose tissue-specific functions. We showed previously that in addition to prolactin, signaling by laminin-111 was necessary to restore functional differentiation of mammary epithelia. Here, we elucidate two additional aspects of laminin-111 action. We show that in 2D cultures, the prolactin receptor is basolaterally localized and physically segregated from its apically placed ligand. Detachment of the cells exposes the receptor to ligation by prolactin leading to signal transducers and activators of transcription protein 5 (STAT5) activation, but only transiently and not sufficiently for induction of milk protein expression. We show that laminin-111 reorganizes mammary cells into polarized acini, allowing both the exposure of the prolactin receptor and sustained activation of STAT5. The use of constitutively active STAT5 constructs showed that the latter is necessary and sufficient for chromatin reorganization and {beta}-casein transcription. These results underscore the crucial role of continuous laminin signaling and polarized tissue architecture in maintenance of transcription factor activation, chromatin organization, and tissue-specific gene expression.

  10. Installation package for a Sunspot Cascade Solar Water Heating System

    SciTech Connect

    1980-09-01

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  11. Preventative Maintenance.

    ERIC Educational Resources Information Center

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  12. Software Maintenance.

    ERIC Educational Resources Information Center

    Cannon, Glenn; Jobe, Holly

    Proper cleaning and storage of audiovisual aids is outlined in this brief guide. Materials and equipment needed for first line maintenance are listed, as well as maintenance procedures for records, audio and video tape, film, filmstrips, slides, realia, models, prints, graphics, maps, and overhead transparencies. A 15-item quiz on software…

  13. Openness to experience and activity engagement facilitate the maintenance of verbal ability in older adults.

    PubMed

    Hogan, Michael J; Staff, Roger T; Bunting, Brendan P; Deary, Ian J; Whalley, Lawrence J

    2012-12-01

    The current study used data from the Aberdeen Birth Cohort, 1936, to investigate the hypothesis that the positive effects of the personality trait Openness on cognitive ability are mediated by activity levels. Results of latent growth modeling analysis revealed that higher Openness predicted better reading ability, inductive reasoning, and memory performance across three testing occasions when participants were aged 64-68 years. Higher Openness predicted higher activity levels, and higher activity levels in turn predicted higher reading ability, but not higher performance on measures of inductive reasoning, memory, and speed of processing. Overall, Openness and activity engagement appear related to preserved higher cognitive ability in older adults, with Openness having a direct effect on marker tests of fluid ability and with the combined influence of Openness and activity being particularly important for marker tests of crystallized intelligence.

  14. Integration of conventional quantitative and phospho-proteomics reveals new elements in activated Jurkat T-cell receptor pathway maintenance.

    PubMed

    Jouy, Florent; Müller, Stephan A; Wagner, Juliane; Otto, Wolfgang; von Bergen, Martin; Tomm, Janina M

    2015-01-01

    Recent years have seen a constant development of tools for the global assessment of phosphoproteins. Here, we outline a concept for integrating approaches for quantitative proteomics and phosphoproteomics. The strategy was applied to the analysis of changes in signalling and protein synthesis occurring after activation of the T-cell receptor (TCR) pathway in a T-cell line (Jurkat cells). For this purpose, peptides were obtained from four biological replicates of activated and control Jurkat T-cells and phosphopeptides enriched via a TiO2-based chromatographic step. Both phosphopeptide-enriched and flow-through fractions were analyzed by LC-MS. We observed 1314 phosphopeptides in the enriched fraction whereas 19 were detected in the flow-through, enabling the quantification of 414 and eight phosphoproteins in the respective fractions. Pathway analysis revealed the differential regulation of many metabolic pathways. Among the quantified proteins, 11 kinases with known TCR-related function were detected. A kinase-substrate database search for the phosphosites identified also confirmed the activity of a further ten kinases. In total, these two approaches provided evidence of 19 unique TCR-related kinases. The combination of phosphoproteomics and conventional quantitative shotgun analysis leads to a more comprehensive assessment of the signalling networks needed for the maintenance of the activated status of Jurkat T-cells.

  15. Automated Methodologies for the Design of Flow Diagrams for Development and Maintenance Activities

    NASA Astrophysics Data System (ADS)

    Shivanand M., Handigund; Shweta, Bhat

    The Software Requirements Specification (SRS) of the organization is a text document prepared by strategic management incorporating the requirements of the organization. These requirements of ongoing business/ project development process involve the software tools, the hardware devices, the manual procedures, the application programs and the communication commands. These components are appropriately ordered for achieving the mission of the concerned process both in the project development and the ongoing business processes, in different flow diagrams viz. activity chart, workflow diagram, activity diagram, component diagram and deployment diagram. This paper proposes two generic, automatic methodologies for the design of various flow diagrams of (i) project development activities, (ii) ongoing business process. The methodologies also resolve the ensuing deadlocks in the flow diagrams and determine the critical paths for the activity chart. Though both methodologies are independent, each complements other in authenticating its correctness and completeness.

  16. Activity-Based Management Accounting for DoD Depot Maintenance

    DTIC Science & Technology

    1994-08-01

    driven by the number of production batches. Examples of batch-related activities include machine setups, material requisitions, and inventory...measures (e.g., direct labor hours and machine hours) to allocate overhead costs to individual products. While these volume-related measures are readily...activities (e.g., the number of machine setups or the number of material orders) that each product consumes, product costs are obtained simply by summing the

  17. CFB refractory maintenance

    SciTech Connect

    Johnson, R.C.

    1994-12-31

    The CFB maintenance manager has to make rapid-fire decisions regarding refractory maintenance during short or unscheduled turnarounds. This presentation offers a hands-on approach to expedient refractory failure analyses with specific repair recommendations. Photographs of most typical CFB refractory failures and their structural repairs are discussed. The most reliable repairs can be expected by using the latest state-of-the-art refractory materials and installation techniques. Refractory materials are consumable; therefore minor repairs should always be conducted at the first opportunity; this will preclude future major repairs. During a short or unscheduled outage, major repairs should be confined to the specific structural repair site; the removal of good, serviceable refractory is unnecessary under these conditions.

  18. Metabolic Maintenance of Cell Asymmetry following Division in Activated T Lymphocytes

    PubMed Central

    Verbist, Katherine C.; Guy, Cliff S; Milasta, Sandra; Liedmann, Swantje; Kamiński, Marcin M.; Wang, Ruoning; Green, Douglas R.

    2016-01-01

    Asymmetric cell division (ACD)—the partitioning of cellular components in response to polarizing cues during mitosis—plays roles in differentiation and development1. ACD is important for the self-renewal of neuroblasts in C. elegans and fertilized zygotes in Drosophila, and participates in the development of mammalian nervous and digestive systems1. T lymphocytes, upon activation by antigen-presenting cells (APC), can undergo ACD, wherein the daughter cell proximal to the APC is more likely to differentiate into an effector-like T cell and the distal daughter more likely to differentiate into a memory-like T cell2. Upon activation and prior to cell division, expression of the transcription factor c-Myc drives metabolic reprogramming, necessary for the subsequent proliferative burst3. We found that during the first division of an activated T cell, c-Myc can sort asymmetrically. Asymmetric amino acid transporter distribution, amino acid content, and TORC1 function correlate with c-Myc expression, and both amino acids and TORC1 activity sustain the differences in c-Myc expression in one daughter over the other. Asymmetric c-Myc levels in daughter T cells affect proliferation, metabolism, and differentiation, and these effects are altered by experimental manipulation of TORC1 activity or Myc expression. Therefore, metabolic signaling pathways cooperate with transcription programs to maintain differential cell fates following asymmetric T cell division. PMID:27064903

  19. 24 CFR 35.1355 - Ongoing lead-based paint maintenance and reevaluation activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Secretary, Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Ongoing lead-based...

  20. 24 CFR 35.1355 - Ongoing lead-based paint maintenance and reevaluation activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Secretary, Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Ongoing lead-based...

  1. 24 CFR 35.1355 - Ongoing lead-based paint maintenance and reevaluation activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Secretary, Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Ongoing lead-based...

  2. 24 CFR 35.1355 - Ongoing lead-based paint maintenance and reevaluation activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Secretary, Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Ongoing lead-based...

  3. 24 CFR 35.1355 - Ongoing lead-based paint maintenance and reevaluation activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Secretary, Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Ongoing lead-based...

  4. Fulfilled Emotional Outcome Expectancies Enable Successful Adoption and Maintenance of Physical Activity

    PubMed Central

    Klusmann, Verena; Musculus, Lisa; Sproesser, Gudrun; Renner, Britta

    2016-01-01

    Although outcome expectancies are regarded as key determinants of health behavior change, studies on the role of their degree of fulfillment in long-term activity changes are lacking. This study investigated the impact of (un-)fulfilled outcome expectancies (OE) on (un-)successful attempts to increase physical activity, assuming that disengagement is the logical consequence of perceived futility. Participants (n = 138) of a longitudinal cohort study with three measurement waves were assigned to eight different groups according to a staging algorithm of their self-reported, 1-year-long physical activity behavior track. Stages were validated by objective changes in objective fitness, e.g., Physical Working Capacity (PWC). Social cognitive variables, self-efficacy, proximal and distal OE, and fulfillment of OE, were assessed via self-report. Discriminant analyses revealed that OE fulfillment was the predominant predictor for differentiating between successful and unsuccessful behavior change. Amongst OE, proximal OE concerning emotional rewards, in conjunction with action self-efficacy, further improved discriminatory power. OE adjustment warranting hedonic rewards appears to be a crucial mechanism as it facilitates long-term changes through interventions aimed at increasing physical activity rates. Theoretical models might benefit by including the concept of fulfilled expectations acting in terms of feedback loops between volitional and motivational processes. PMID:26779095

  5. Developmental Differences in Prefrontal Activation during Working Memory Maintenance and Manipulation for Different Memory Loads

    ERIC Educational Resources Information Center

    Jolles, Dietsje D.; Kleibeuker, Sietske W.; Rombouts, Serge A. R. B.; Crone, Eveline A.

    2011-01-01

    The ability to keep information active in working memory is one of the cornerstones of cognitive development. Prior studies have demonstrated that regions which are important for working memory performance in adults, such as dorsolateral prefrontal cortex (DLPFC), ventrolateral prefrontal cortex (VLPFC), and superior parietal cortex, become…

  6. A novel solubility-enhanced curcumin formulation showing stability and maintenance of anticancer activity.

    PubMed

    Zhang, Fang; Koh, Gar Yee; Jeansonne, Duane P; Hollingsworth, Javoris; Russo, Paul S; Vicente, Graca; Stout, Rhett W; Liu, Zhijun

    2011-07-01

    Curcumin (CUR) is an active food compound, but its insolubility and instability in water contributes to low bioavailability. In this study, the solubility of CUR was enhanced by utilizing the solubilizing properties of rubusoside (RUB). The solubility of CUR in water increased linearly from 61 μg/mL to 2.318 mg/mL in the presence of RUB ranging from 1% to 10% (w/v). Dynamic light scattering and transmission electron microscopy studies found that CUR and RUB formed CUR-RUB nanoparticle (∼8 nm) complexes. The RUB-solubilized CUR was stable in physiological conditions and did not precipitate when diluted or degrade when spray-dried to a completely reconstitutable powder. Furthermore, cell viability assays demonstrated the efficacy of RUB-solubilized CUR against human colon, breast, and pancreatic cancer cell lines. The development of this new solubilized, stable, and biologically active CUR formulation lays the foundation for future bioavailability improvement.

  7. Maintenance of biological activity of pertussis toxin radioiodinated while bound to fetuin-agarose

    SciTech Connect

    Armstrong, G.D.; Peppler, M.S.

    1987-05-01

    We developed a method to produce radioiodinated pertussis toxin (PT) which was active in the goose erythrocyte agglutination and CHO cell assay systems. The procedure used fetuin coupled to agarose to prevent inactivation of the toxin during the iodination reaction. Analysis of the labeled PT by affinity chromatography on fetuin-agarose and wheat germ agglutinin-agarose and by sodium dodecyl sulfate-polyacrylamide gel electrophoresis indicated that there were minimal amounts of labeled fetuin or other contaminants in the labeled PT preparations. All five of the subunits of the toxin appeared to be labeled by the procedure. The labeling method will facilitate further investigations into the nature of the interaction and activity of PT in host tissues.

  8. The role of EVA on Space Shuttle. [experimental support and maintenance activities

    NASA Technical Reports Server (NTRS)

    Carson, M. A.

    1974-01-01

    The purpose of this paper is to present the history of Extravehicular Activity (EVA) through the Skylab Program and to outline the expected tasks and equipment capabilities projected for the Space Shuttle Program. Advantages offered by EVA as a tool to extend payload capabilities and effectiveness and economic advantages of using EVA will be explored. The presentation will conclude with some guidelines and recommendations for consideration by payload investigators in establishing concepts and designs utilizing EVA support.

  9. Maintenance of Iron Status in Healthy Men during an Extended Period of Stress and Physical Activity

    DTIC Science & Technology

    1993-01-01

    scribed elsewhere who engage in physical training with low re- and physical activity in healthy men. a serves and marginal dietary iron intakes (6. 12. 28...116 ± 84 to 202 ± 106 /g/L (P > 0.05). Ade- is unclear whether the changes in iron metabolism persist during quate dietary iron, initiation of...the entire 8-wk training course. Beaumont Army Medical Center, El Paso, TX (phase 4). Differ- The average daily energy and protein intakes , determined

  10. Maintenance of GABAergic activity by neuregulin 1-ErbB4 in amygdala for fear memory.

    PubMed

    Lu, Yisheng; Sun, Xiang-Dong; Hou, Feng-Qing; Bi, Lin-Lin; Yin, Dong-Min; Liu, Fang; Chen, Yong-Jun; Bean, Jonathan C; Jiao, Hui-Feng; Liu, Xihui; Li, Bao-Ming; Xiong, Wen-Cheng; Gao, Tian-Ming; Mei, Lin

    2014-11-19

    Inhibitory neurotransmission in amygdala is important for fear learning and memory. However, mechanisms that control the inhibitory activity in amygdala are not well understood. We provide evidence that neuregulin 1 (NRG1) and its receptor ErbB4 tyrosine kinase are critical for maintaining GABAergic activity in amygdala. Neutralizing endogenous NRG1, inhibition, or genetic ablation of ErbB4, which was expressed in a majority of palvalbumin (PV)+ neurons in amygdala, reduced GABAergic transmission and inhibited tone-cued fear conditioning. Specific ablation of ErbB4 in PV+ neurons reduced eIPSC/eEPSC ratios and impaired fear conditioning. Notably, expression of ErbB4 in amygdala was sufficient to diminish synaptic dysfunction and fear conditioning deficits in PV-ErbB4-/- mice. These observations indicated that NRG1 signaling maintains high GABAergic activity in amygdala and, thus, regulates fear memory. Considering that both NRG1 and ErbB4 are susceptibility genes of schizophrenia, our study sheds light on potential pathophysiological mechanisms of this disorder.

  11. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Recommended Practice for Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety..., storage tanks, compressors, pipeline pumps, metering devices, and other hydrocarbon-handling vessels. (2.... (6) The design and schematics of the installation and maintenance of all fire- and...

  12. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Recommended Practice for Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety..., storage tanks, compressors, pipeline pumps, metering devices, and other hydrocarbon-handling vessels. (2.... (6) The design and schematics of the installation and maintenance of all fire- and...

  13. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Recommended Practice for Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety..., storage tanks, compressors, pipeline pumps, metering devices, and other hydrocarbon-handling vessels. (2.... (6) The design and schematics of the installation and maintenance of all fire- and...

  14. Maintenance of submersible pumps in the septic tanks: ergonomic and biological risks to the worker.

    PubMed

    Mariño, Suzi; Figueiredo, Alex

    2012-01-01

    In this study was observed the maintenance task of submersible pumps septic tanks installed in industrial bathrooms. This maintenance activity operators are exposed to various biological and ergonomic risks. This type of activity requires its great physical performers who are also subject to contact with human waste in the form of liquids, gases and solids. Besides the problems mentioned, are still exposed to high temperatures that can cause diseases such as hyperthermia or heatstroke. These aspects were observed using the ergonomic assessment methodology in order to suggest improvements that are reflected in productivity and employee satisfaction.

  15. Involvement of IL-1 in the Maintenance of Masseter Muscle Activity and Glucose Homeostasis

    PubMed Central

    Chiba, Ko; Tsuchiya, Masahiro; Koide, Masashi; Hagiwara, Yoshihiro; Sasaki, Keiichi; Hattori, Yoshinori; Watanabe, Makoto; Sugawara, Shunji; Kanzaki, Makoto; Endo, Yasuo

    2015-01-01

    Physical exercise reportedly stimulates IL-1 production within working skeletal muscles, but its physiological significance remains unknown due to the existence of two distinct IL-1 isoforms, IL-1α and IL-1β. The regulatory complexities of these two isoforms, in terms of which cells in muscles produce them and their distinct/redundant biological actions, have yet to be elucidated. Taking advantage of our masticatory behavior (Restrained/Gnawing) model, we herein show that IL-1α/1β-double-knockout (IL-1-KO) mice exhibit compromised masseter muscle (MM) activity which is at least partially attributable to abnormalities of glucose handling (rapid glycogen depletion along with impaired glucose uptake) and dysfunction of IL-6 upregulation in working MMs. In wild-type mice, masticatory behavior clearly increased IL-1β mRNA expression but no incremental protein abundance was detectable in whole MM homogenates, whereas immunohistochemical staining analysis revealed that both IL-1α- and IL-1β-immunopositive cells were recruited around blood vessels in the perimysium of MMs after masticatory behavior. In addition to the aforementioned phenotype of IL-1-KO mice, we found the IL-6 mRNA and protein levels in MMs after masticatory behavior to be significantly lower in IL-1-KO than in WT. Thus, our findings confirm that the locally-increased IL-1 elicited by masticatory behavior, although present small in amounts, contributes to supporting MM activity by maintaining normal glucose homeostasis in these muscles. Our data also underscore the importance of IL-1-mediated local interplay between autocrine myokines including IL-6 and paracrine cytokines in active skeletal muscles. This interplay is directly involved in MM performance and fatigability, perhaps mediated through maintaining muscular glucose homeostasis. PMID:26599867

  16. High Antioxidant Activity Facilitates Maintenance of Cell Division in Leaves of Drought Tolerant Maize Hybrids

    PubMed Central

    Avramova, Viktoriya; AbdElgawad, Hamada; Vasileva, Ivanina; Petrova, Alexandra S.; Holek, Anna; Mariën, Joachim; Asard, Han; Beemster, Gerrit T. S.

    2017-01-01

    We studied the impact of drought on growth regulation in leaves of 13 maize varieties with different drought sensitivity and geographic origins (Western Europe, Egypt, South Africa) and the inbred line B73. Combining kinematic analysis of the maize leaf growth zone with biochemical measurements at a high spatial resolution allowed us to examine the correlation between the regulation of the cellular processes cell division and elongation, and the molecular redox-regulation in response to drought. Moreover, we demonstrated differences in the response of the maize lines to mild and severe levels of water deficit. Kinematic analysis indicated that drought tolerant lines experienced less impact on leaf elongation rate due to a smaller reduction of cell production, which, in turn, was due to a smaller decrease of meristem size and number of cells in the leaf meristem. Clear differences in growth responses between the groups of lines with different geographic origin were observed in response to drought. The difference in drought tolerance between the Egyptian hybrids was significantly larger than between the European and South-African hybrids. Through biochemical analyses, we investigated whether antioxidant activity in the growth zone, contributes to the drought sensitivity differences. We used a hierarchical clustering to visualize the patterns of lipid peroxidation, H2O2 and antioxidant concentrations, and enzyme activities throughout the growth zone, in response to stress. The results showed that the lines with different geographic region used different molecular strategies to cope with the stress, with the Egyptian hybrids responding more at the metabolite level and African and the European hybrids at the enzyme level. However, drought tolerance correlated with both, higher antioxidant levels throughout the growth zone and higher activities of the redox-regulating enzymes CAT, POX, APX, and GR specifically in leaf meristems. These findings provide evidence for a link

  17. Involvement of IL-1 in the Maintenance of Masseter Muscle Activity and Glucose Homeostasis.

    PubMed

    Chiba, Ko; Tsuchiya, Masahiro; Koide, Masashi; Hagiwara, Yoshihiro; Sasaki, Keiichi; Hattori, Yoshinori; Watanabe, Makoto; Sugawara, Shunji; Kanzaki, Makoto; Endo, Yasuo

    2015-01-01

    Physical exercise reportedly stimulates IL-1 production within working skeletal muscles, but its physiological significance remains unknown due to the existence of two distinct IL-1 isoforms, IL-1α and IL-1β. The regulatory complexities of these two isoforms, in terms of which cells in muscles produce them and their distinct/redundant biological actions, have yet to be elucidated. Taking advantage of our masticatory behavior (Restrained/Gnawing) model, we herein show that IL-1α/1β-double-knockout (IL-1-KO) mice exhibit compromised masseter muscle (MM) activity which is at least partially attributable to abnormalities of glucose handling (rapid glycogen depletion along with impaired glucose uptake) and dysfunction of IL-6 upregulation in working MMs. In wild-type mice, masticatory behavior clearly increased IL-1β mRNA expression but no incremental protein abundance was detectable in whole MM homogenates, whereas immunohistochemical staining analysis revealed that both IL-1α- and IL-1β-immunopositive cells were recruited around blood vessels in the perimysium of MMs after masticatory behavior. In addition to the aforementioned phenotype of IL-1-KO mice, we found the IL-6 mRNA and protein levels in MMs after masticatory behavior to be significantly lower in IL-1-KO than in WT. Thus, our findings confirm that the locally-increased IL-1 elicited by masticatory behavior, although present small in amounts, contributes to supporting MM activity by maintaining normal glucose homeostasis in these muscles. Our data also underscore the importance of IL-1-mediated local interplay between autocrine myokines including IL-6 and paracrine cytokines in active skeletal muscles. This interplay is directly involved in MM performance and fatigability, perhaps mediated through maintaining muscular glucose homeostasis.

  18. Breast cancer survivors involved in vigorous team physical activity: psychosocial correlates of maintenance participation.

    PubMed

    Culos-Reed, S Nicole; Shields, Christopher; Brawley, Lawrence R

    2005-07-01

    Physical activity is increasingly being promoted as a means to achieve both physical and psychological benefits for cancer survivors. For women with breast cancer, one sport growing in popularity is dragon boating. The purpose of the present investigation was to examine the psychosocial correlates of dragon boat participation over the course of a season. Six crews completed the baseline (early-season) assessment (n = 109) and late-season assessments (n = 56). The self-report questionnaire completed at both time points included an assessment of the theory of planned behaviour variables, quality of life, cohesion, and physical activity levels. A prospective examination of the TPB variables revealed attitude at early season as the only significant predictor of behavioural intentions 12 weeks later at late season (R2 adjusted = 0.27, p < 0.001). Overall, the group environment was cohesive at a level similar to that for female sport teams among the asymptomatic population. As well, participants' health-related quality of life was similar to normal, healthy women of similar age for both mental and physical health.

  19. Neural activation patterns of successful episodic encoding: Reorganization during childhood, maintenance in old age.

    PubMed

    Shing, Yee Lee; Brehmer, Yvonne; Heekeren, Hauke R; Bäckman, Lars; Lindenberger, Ulman

    2016-08-01

    The two-component framework of episodic memory (EM) development posits that the contributions of medial temporal lobe (MTL) and prefrontal cortex (PFC) to successful encoding differ across the lifespan. To test the framework's hypotheses, we compared subsequent memory effects (SME) of 10-12 year-old children, younger adults, and older adults using functional magnetic resonance imaging (fMRI). Memory was probed by cued recall, and SME were defined as regional activation differences during encoding between subsequently correctly recalled versus omitted items. In MTL areas, children's SME did not differ in magnitude from those of younger and older adults. In contrast, children's SME in PFC were weaker than the corresponding SME in younger and older adults, in line with the hypothesis that PFC contributes less to successful encoding in childhood. Differences in SME between younger and older adults were negligible. The present results suggest that, among individuals with high memory functioning, the neural circuitry contributing to successful episodic encoding is reorganized from middle childhood to adulthood. Successful episodic encoding in later adulthood, however, is characterized by the ability to maintain the activation patterns that emerged in young adulthood.

  20. Drosophila Uri, a PP1α binding protein, is essential for viability, maintenance of DNA integrity and normal transcriptional activity

    PubMed Central

    Kirchner, Jasmin; Vissi, Emese; Gross, Sascha; Szoor, Balazs; Rudenko, Andrey; Alphey, Luke; White-Cooper, Helen

    2008-01-01

    Background Protein phosphatase 1 (PP1) is involved in diverse cellular processes, and is targeted to substrates via interaction with many different protein binding partners. PP1 catalytic subunits (PP1c) fall into PP1α and PP1β subfamilies based on sequence analysis, however very few PP1c binding proteins have been demonstrated to discriminate between PP1α and PP1β. Results URI (unconventional prefoldin RPB5 interactor) is a conserved molecular chaperone implicated in a variety of cellular processes, including the transcriptional response to nutrient signalling and maintenance of DNA integrity. We show that Drosophila Uri binds PP1α with much higher affinity than PP1β, and that this ability to discriminate between PP1c forms is conserved to humans. Most Uri is cytoplasmic, however we found some protein associated with active RNAPII on chromatin. We generated a uri loss of function allele, and show that uri is essential for viability in Drosophila. uri mutants have transcriptional defects, reduced cell viability and differentiation in the germline, and accumulate DNA damage in their nuclei. Conclusion Uri is the first PP1α specific binding protein to be described in Drosophila. Uri protein plays a role in transcriptional regulation. Activity of uri is required to maintain DNA integrity and cell survival in normal development. PMID:18412953

  1. Spinal astrocytic activation contributes to both induction and maintenance of pituitary adenylate cyclase-activating polypeptide type 1 receptor-induced long-lasting mechanical allodynia in mice

    PubMed Central

    Yokai, Masafumi; Miyata, Atsuro

    2016-01-01

    Background Pituitary adenylate cyclase-activating polypeptide (PACAP) and its receptors are present in the spinal dorsal horn and dorsal root ganglia, suggesting an important role of PACAP–PACAP receptors signaling system in the modulation of spinal nociceptive transmission. We have previously reported that a single intrathecal injection of PACAP or a PACAP specific (PAC1) receptor selective agonist, maxadilan, in mice induced dose-dependent aversive behaviors, which lasted more than 30 min, and suggested that the maintenance of the nociceptive behaviors was associated with the spinal astrocytic activation. Results We found that a single intrathecal administration of PACAP or maxadilan also produced long-lasting hind paw mechanical allodynia, which persisted at least 84 days without affecting thermal nociceptive threshold. In contrast, intrathecal application of vasoactive intestinal polypeptide did not change mechanical threshold, and substance P, calcitonin gene-related peptide, or N-methyl-D-aspartate induced only transient mechanical allodynia, which disappeared within 21 days. Western blot and immunohistochemical analyses with an astrocytic marker, glial fibrillary acidic protein, revealed that the spinal PAC1 receptor stimulation caused sustained astrocytic activation, which also lasted more than 84 days. Intrathecal co-administration of L-α-aminoadipate, an astroglial toxin, with PACAP or maxadilan almost completely prevented the induction of the mechanical allodynia. Furthermore, intrathecal treatment of L-α-aminoadipate at 84 days after the PAC1 stimulation transiently reversed the mechanical allodynia accompanied by the reduction of glial fibrillary acidic protein expression level. Conclusion Our data suggest that spinal astrocytic activation triggered by the PAC1 receptor stimulation contributes to both induction and maintenance of the long-term mechanical allodynia. PMID:27175011

  2. Design and installation manual for thermal energy storage

    SciTech Connect

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  3. High normalized beta plasmas exceeding the ideal stability limit and projected RWM active stabilization performance using newly installed feedback sensors in KSTAR

    NASA Astrophysics Data System (ADS)

    Park, Y. S.; Sabbagh, S. A.; Berkery, J. W.; Bialek, J. M.; Yoon, S. W.; Jeon, Y. M.; Bak, J. G.; Ko, W. H.; Hahn, S. H.; Bae, C.; Bae, Y. S.; in, Y. K.; Kim, J.; Lee, S. G.; Kwak, J. G.; Oh, Y. K.; Park, H. K.; Choi, M. J.; Yun, G. S.

    2015-11-01

    H-mode plasma operation of KSTAR has been expanded to significantly surpass the ideal MHD no-wall beta limit by achieving normalized beta up to 4.3 while reducing plasma internal inductance to near 0.7 exceeding the computed n = 1 ideal no-wall limit by a factor of 1.6. These high normalized beta values have been achieved in discharges having BT in the range 0.9-1.1 T after the plasma reached flattop current of 0.35-0.4 MA, with the highest neutral beam heating power of 4 MW. A significant conclusion of the analysis of these plasmas is that low- n global kink/ballooning or RWMs were not detected, and therefore were not the cause of the plasma termination. Advances from the 2015 run campaign aiming to achieve prolonged pulse duration at maximum normalized beta and to subsequently investigate the MHD stability of these plasmas will be reported. As KSTAR H-mode operation can now routinely surpass the ideal no-wall stability limit, n = 1 RWM active control is planned for the device. RWM active feedback using a newly installed set of poloidal magnetic field sensors mounted on the passive stabilizer plates and designed for optimal performance is analyzed using the VALEN-3D code. The advantages of the new sensors over other device sensors for RWM active control are discussed. Supported by U.S. DOE grant DE-FG02-99ER54524.

  4. Exploring Behavioral Markers of Long-Term Physical Activity Maintenance: A Case Study of System Identification Modeling within a Behavioral Intervention

    ERIC Educational Resources Information Center

    Hekler, Eric B.; Buman, Matthew P.; Poothakandiyil, Nikhil; Rivera, Daniel E.; Dzierzewski, Joseph M.; Aiken Morgan, Adrienne; McCrae, Christina S.; Roberts, Beverly L.; Marsiske, Michael; Giacobbi, Peter R., Jr.

    2013-01-01

    Efficacious interventions to promote long-term maintenance of physical activity are not well understood. Engineers have developed methods to create dynamical system models for modeling idiographic (i.e., within-person) relationships within systems. In behavioral research, dynamical systems modeling may assist in decomposing intervention effects…

  5. Lead exposure in a petroleum refinery during maintenance and repair activities

    SciTech Connect

    Booher, L.E.; Zampello, F.C.

    1994-02-01

    Exposure to inorganic lead (Pb) may result in a petroleum refinery when paints that contain Pb are disturbed. Frequently performed activities that disturb paint include welding, burning, cutting, abrasive blasting, sanding, grinding, and needle gun chipping. The purpose of the study reported in this article was: to determine the Pb content of paint on metal surfaces in a petroleum refinery; to measure air Pb concentrations during abrasive blasting, torch cutting and burning, and power disk sanding/grinding on surfaces coated with Pb paint; and to evaluate the effectiveness of worker exposure controls by monitoring worker blood Pb (PbB) levels. Pb levels on representative metal surfaces were measured, and most painted surfaces were found to contain significant amounts of Pb. Personal air samples collected indicated that abrasive blasting and torch burning/cutting resulted in elevated air Pb levels, while short duration power disk sanding (less than 30 minutes duration) did not result in elevated air Pb levels as compared to the Occupational Safety and Health Administration permissible exposure limit. Despite these elevated air Pb levels, exposure controls including personal protective equipment, housekeeping, showering, work area isolation, and training effectively prevented elevated worker PbB levels. 6 refs., 4 figs., 3 tabs.

  6. Space exploration by dendritic cells requires maintenance of myosin II activity by IP3 receptor 1.

    PubMed

    Solanes, Paola; Heuzé, Mélina L; Maurin, Mathieu; Bretou, Marine; Lautenschlaeger, Franziska; Maiuri, Paolo; Terriac, Emmanuel; Thoulouze, Maria-Isabel; Launay, Pierre; Piel, Matthieu; Vargas, Pablo; Lennon-Duménil, Ana-Maria

    2015-03-12

    Dendritic cells (DCs) patrol the interstitial space of peripheral tissues. The mechanisms that regulate their migration in such constrained environment remain unknown. We here investigated the role of calcium in immature DCs migrating in confinement. We found that they displayed calcium oscillations that were independent of extracellular calcium and more frequently observed in DCs undergoing strong speed fluctuations. In these cells, calcium spikes were associated with fast motility phases. IP₃ receptors (IP₃Rs) channels, which allow calcium release from the endoplasmic reticulum, were identified as required for immature DCs to migrate at fast speed. The IP₃R1 isoform was further shown to specifically regulate the locomotion persistence of immature DCs, that is, their capacity to maintain directional migration. This function of IP₃R1 results from its ability to control the phosphorylation levels of myosin II regulatory light chain (MLC) and the back/front polarization of the motor protein. We propose that by upholding myosin II activity, constitutive calcium release from the ER through IP₃R1 maintains DC polarity during migration in confinement, facilitating the exploration of their environment.

  7. Functionalized self-assembling peptide hydrogel enhance maintenance of hepatocyte activity in vitro

    PubMed Central

    Genové, Elsa; Schmitmeier, Stephanie; Sala, Ana; Borrós, Salvador; Bader, Augustinus; Griffith, Linda G; Semino, Carlos E

    2009-01-01

    There is a major challenge in maintaining functional hepatocytes in vivo as these cells rapidly lose their metabolic properties in culture. In this work we have developed a bioengineered platform that replaces the use of the collagen I – in the traditional culture sandwich technique – by a defined extracellular matrix analogue, the self-assembling peptide hydrogel RAD16-I functionalized with biologically active motifs. Thus, after examining side by side the two culture systems we have found that in both cases hepatocytes acquired similar parenchymal morphology, presence of functional bile canaliculi structures, CYP3A2 induction by dexamethasone, urea production, secretion of proteins such as apolipoprotein (class A1, E, J), α1-microglobulin, α1-macroglobulin, retinol binding protein, fibronectin, α1-inhibitor III and biotin-dependent carboxylases. Interestingly, by assessing in more detail some other hepatic markers, one of the functionalized matrix analogues – carrying the 67 kD laminin receptor ligand – enhanced the gene expression of albumin, HNF4-α, MDR2 and tyrosine aminotransferase. We conclude that the use of a synthetic culture system with designed matrix functionalization has the advantage in controlling specific cellular responses. PMID:19912437

  8. Energy recovery heat exchanger installation

    SciTech Connect

    Bradshaw, N.F.

    1983-08-16

    An installation is disclosed for energy recovery heat exchangers arranged to transfer heat into or out of air exhausted from an air handling system for paint spray booths. The system includes a collection chamber about which the intakes of a series of exhaust fans are arranged to draw exhaust air into an exhaust stack. Pairs of inclined wetted surface coil sets are mounted in the walls of the enclosures, each in communication with the intake of an exhaust fan so as to receive airflow of each exhaust fan. Each of the enclosures is provided with an access door to enable cleaning and other maintenance chores to be carried out on the coil sets and pivotally mounted blocking panels may be positioned to close off air flow across the coils and bypassing of the exhaust flow through the access doors in the event excessive overspray solids are present in the exhaust flow.

  9. Installing and maintaining gear pumps

    SciTech Connect

    Whitmire, K.

    1996-03-01

    While not as common as centrifugal pumps in the CPI, gear pumps play important roles in handling many of today`s more difficult-to-pump fluids. Because they operate at lower speeds -- generally, 900 rpm or less -- their seals and bearings tend to last longer than those of centrifugal models. In addition, unlike centrifugal pumps, gear pumps` flows are independent of their systems` pressure curves, and they can handle a wider range of viscosities. Although high-flow, low-head applications remain the domain of centrifugal pumps, the use of gear pumps is increasing in the chemical process industries (CPI). While some application boundaries between gears and centrifugals are blurring, there are some crucial differences between the way the two are operated and maintained -- for example, where pressure relief is concerned. This article provides a general summary of gear pump characteristics and applications, highlighting critical aspects of installation, operation and maintenance.

  10. The Effect of Programed Physical Activity Measured with Levels of Body Balance Maintenance

    PubMed Central

    Mańko, Grzegorz; Kruczkowski, Dariusz; Niźnikowski, Tomasz; Perliński, Jacek; Chantsoulis, Marzena; Pokorska, Joanna; Łukaszewska, Beata; Ziółkowski, Artur; Graczyk, Marek; Starczyńska, Małgorzata; Jaszczur-Nowicki, Jarosław

    2014-01-01

    Background The aim of the research was an evaluation of 2 training programs covering the same standard physical activity in the initial stage (warm-up) and the main (motor exercises) as well as a separate end part in Program A of stretching and in Programme B of vibration training designed to improve the level of body balance. Material/Methods We tested 40 randomly chosen students of the Academy of Physical Education and Sport in Gdansk, subsequently divided into two 20-person groups: C (average age 21.3±1.2), and E (average age 21.8±1.1). The training of body balance was conducted for 8 weeks: we used in Group C Program A and in group E Program B. The evaluation of body balance was done 3 times: at the beginning, at midway point, and at the end of the experiment. The stabilographic tests with posture-graphical method and the task of 1-leg balance standing with eyes closed was used. Results It was found that in the first examination both groups did not significantly differ in terms of the tested parameters of balance. During the training process we obtained increased time of maintaining balance on 1 leg. This difference was significant between tests 1 and 2 both for Group C (p=0.0002) and for E (p=0.0034), while between the tests 2 and 3 in Group E (p=0.0213) only. Conclusions The training Program B is more effective to maintain balance on 1 leg when compared to Program A. PMID:25284349

  11. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  12. Water Loss Control for Military Installations

    DTIC Science & Technology

    2011-05-12

    US Army Corps of Engineers BUILDING STRONG® Water Loss Control for Military Installations Richard J. Scholze US Army ERDC-CERL, Champaign, IL...THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 BUILDING STRONG® BUILDING STRONG® BUILDING STRONG® Background...economic and environmental concerns  Preventive maintenance ► Water systems underground, out of sight, out of mind BUILDING STRONG® True Cost of

  13. The Mit Abu El Kom Solar demonstration project in Egypt. Phase A: Solar thermal installations

    NASA Astrophysics Data System (ADS)

    Reinmuth, F.

    1981-09-01

    Maintenance-free solar installations were tested under unfavorable operating conditions in a village in Egypt. Thirty-five simple domestic hot water installations, designed as natural circulation systems of a collector surface of 2 sqm each and a 120 liter boiler mounted on the roof were examined. These installations were completely mounted and commissioned. The performance and efficiency of the systems were satisfactory.

  14. Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.

    ERIC Educational Resources Information Center

    Seaman, George B., Sr.

    This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…

  15. Which Socio-Ecological Factors Associate with a Switch to or Maintenance of Active and Passive Transport during the Transition from Primary to Secondary School?

    PubMed Central

    Vanwolleghem, Griet; Van Dyck, Delfien; De Meester, Femke; De Bourdeaudhuij, Ilse; Cardon, Greet; Gheysen, Freja

    2016-01-01

    Objectives The aim was to investigate which individual, psychosocial and physical neighborhood environmental factors associate with children’s switch to or maintenance of active/passive transport to school and to leisure time destinations during the transition from primary to secondary school. Methods Children (n = 313) filled out a questionnaire in the last year of primary school and 2 years later to assess socio-demographic characteristics and self-reported transport. One of their parents completed a questionnaire to assess parental perceptions of psychosocial and physical neighborhood environmental factors. Results The increase of the home-school distance was significantly associated with children’s switch to or maintenance of passive transport to school compared to a switch to (OR = 0.81; p = 0.03) and maintenance (OR = 0.87; p = 0.03) of active transport to school. Low SES was associated with children’s switch to active transport to school compared to maintenance of active transport (OR = 3.67; p = 0.07). For transport to leisure time destinations, other factors such as parental perceived neighborhood safety from traffic and crime (OR = 2.78; p = 0.004), a positive social norm (OR = 1.49; p = 0.08), positive attitudes (OR = 1.39; p = 0.08) (i.e. more benefits, less barriers) towards their children’s physical activity and poor walking/cycling facilities in the neighborhood (OR = 0.70; p = 0.06) were associated with children’s maintenance of active transport to leisure time destinations compared to a switch to or maintenance of passive transport. Conclusions This longitudinal study can give directions for interventions promoting children’s active transport during the transition to secondary school. It is necessary to promote different possibilities at primary school for children to use active transport when going to secondary school. Walking/cycling a part of the home-school trip can be a possible solution for children who will be living at non

  16. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... hole patching, crack sealing, chip sealing, surface rejuvenation, and thin overlays (less than 1...

  17. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... hole patching, crack sealing, chip sealing, surface rejuvenation, and thin overlays (less than 1...

  18. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... hole patching, crack sealing, chip sealing, surface rejuvenation, and thin overlays (less than 1...

  19. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... hole patching, crack sealing, chip sealing, surface rejuvenation, and thin overlays (less than 1...

  20. Exploring behavioral markers of long-term physical activity maintenance: a case study of system identification modeling within a behavioral intervention.

    PubMed

    Hekler, Eric B; Buman, Matthew P; Poothakandiyil, Nikhil; Rivera, Daniel E; Dzierzewski, Joseph M; Morgan, Adrienne Aiken; McCrae, Christina S; Roberts, Beverly L; Marsiske, Michael; Giacobbi, Peter R

    2013-10-01

    Efficacious interventions to promote long-term maintenance of physical activity are not well understood. Engineers have developed methods to create dynamical system models for modeling idiographic (i.e., within-person) relationships within systems. In behavioral research, dynamical systems modeling may assist in decomposing intervention effects and identifying key behavioral patterns that may foster behavioral maintenance. The Active Adult Mentoring Program was a 16-week randomized controlled trial of a group-based, peer-delivered physical activity intervention targeting older adults. Time-intensive (i.e., daily) physical activity reports were collected throughout the intervention. We explored differential patterns of behavior among participants who received the active intervention (N = 34; 88% women, 64.1 ± 8.3 years of age) and either maintained 150 minutes/week of moderate to vigorous intensity physical activity (MVPA; n = 10) or did not (n = 24) at 18 months following the intervention period. We used dynamical systems modeling to explore whether key intervention components (i.e., self-monitoring, access to an exercise facility, behavioral initiation training, behavioral maintenance training) and theoretically plausible behavioral covariates (i.e., indoor vs. outdoor activity) predicted differential patterns of behavior among maintainers and nonmaintainers. We found that maintainers took longer to reach a steady-state of MVPA. At week 10 of the intervention, nonmaintainers began to drop whereas maintainers increased MVPA. Self-monitoring, behavioral initiation training, percentage of outdoor activity, and behavioral maintenance training, but not access to an exercise facility, were key variables that explained patterns of change among maintainers. Future studies should be conducted to systematically explore these concepts within a priori idiographic (i.e., N-of-1) experimental designs.

  1. Influences of establishment and maintenance of territory on reproductive activity in the male dwarf gourami Colisa lalia.

    PubMed

    Hayakawa, Youichi; Kobayashi, Makito

    2012-03-01

    We examined the importance of establishment and maintenance of territory on reproductive activity in the male dwarf gourami, Colisa lalia. After three males had been forced to fight for territory (five sets) for three weeks, social status was divided into three classes: the territorially dominant male, which guarded the territory under the floating nest; the second male which remained near the nest and occasionally attacked the dominant male; and the third male which was non-aggressive and remained at a distance from the other two males. Comparing testicular size by gonadosomatic indices (GSI) after three weeks of aggression, GSI of the dominant male (1.19 ± 0.07) was significantly larger than that of the second (0.81 ± 0.15) and the third (0.62 ± 0.08) males, as well as the initial control (not involved in any experiments: 0.85 ± 0.10, n = 5), indicating that the testes of the dominant males enlarge during territory defense. Histological observations of testes revealed that sperm production in the dominant males was more active compared to males of other classes, although spermatogenesis was confirmed in all males examined, suggesting that dominance accelerates sperm production. Social-status dependent development of testes suggests an absence of sperm competition due to the lack of sneaking by subordinate males. Since non-territorial males do not engage in alternative tactics (e.g., sneaking) leading to emission of semen, male C. lalia must obtain and defend territory if they are to increase their reproductive success.

  2. Cocaine users with comorbid Cluster B personality disorders show dysfunctional brain activation and connectivity in the emotional regulation networks during negative emotion maintenance and reappraisal.

    PubMed

    Albein-Urios, Natalia; Verdejo-Román, Juan; Soriano-Mas, Carles; Asensio, Samuel; Martínez-González, José Miguel; Verdejo-García, Antonio

    2013-12-01

    Cocaine dependence often co-occurs with Cluster B personality disorders. Since both disorders are characterized by emotion regulation deficits, we predicted that cocaine comorbid patients would exhibit dysfunctional patterns of brain activation and connectivity during reappraisal of negative emotions. We recruited 18 cocaine users with comorbid Cluster B personality disorders, 17 cocaine users without comorbidities and 21 controls to be scanned using functional magnetic resonance imaging (fMRI) during performance on a reappraisal task in which they had to maintain or suppress the emotions induced by negative affective stimuli. We followed region of interest (ROI) and whole-brain approaches to investigate brain activations and connectivity associated with negative emotion experience and reappraisal. Results showed that cocaine users with comorbid personality disorders had reduced activation of the subgenual anterior cingulate cortex during negative emotion maintenance and increased activation of the lateral orbitofrontal cortex and the amygdala during reappraisal. Amygdala activation correlated with impulsivity and antisocial beliefs in the comorbid group. Connectivity analyses showed that in the cocaine comorbid group the subgenual cingulate was less efficiently connected with the amygdala and the fusiform gyri and more efficiently connected with the anterior insula during maintenance, whereas during reappraisal the left orbitofrontal cortex was more efficiently connected with the amygdala and the right orbitofrontal cortex was less efficiently connected with the dorsal striatum. We conclude that cocaine users with comorbid Cluster B personality disorders have distinctive patterns of brain activation and connectivity during maintenance and reappraisal of negative emotions, which correlate with impulsivity and dysfunctional beliefs.

  3. Preventive medicine oversight of splash pads on military installations.

    PubMed

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.

  4. AMS Time Lapse Installation

    NASA Video Gallery

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  5. Galactose-installed photo-crosslinked pH-sensitive degradable micelles for active targeting chemotherapy of hepatocellular carcinoma in mice.

    PubMed

    Zou, Yan; Song, Yuan; Yang, Weijing; Meng, Fenghua; Liu, Haiyan; Zhong, Zhiyuan

    2014-11-10

    In this study, we designed and developed galactose-installed photo-crosslinked pH-sensitive degradable micelles (Gal-CLMs) for active targeting chemotherapy of hepatocellular carcinoma in mice. Gal-CLMs were readily obtained from co-self-assembly of poly(ethylene glycol)-b-poly(mono-2,4,6-trimethoxy benzylidene-pentaerythritol carbonate-co-acryloyl carbonate) (PEG-b-P(TMBPEC-co-AC)) and Gal-PEG-b-poly(ε-caprolactone) (Gal-PEG-b-PCL) copolymers followed by photo-crosslinking. Notably, paclitaxel (PTX)-loaded Gal-CLMs (Gal-PTX-CLMs) showed a narrow distribution (PDI=0.08-0.12) with average sizes ranging from 92.1 to 136.3nm depending on the Gal contents. The release of PTX from Gal-CLMs while inhibited at physiological pH was enhanced under endosomal pH conditions. MTT assays in asialoglycoprotein receptor (ASGP-R) over-expressing HepG2 cells demonstrated that half-maximal inhibitory concentration (IC50) values of Gal-PTX-CLMs decreased from 11.7 to 2.9 to 1.1μg/mL with increasing Gal contents from 10% to 20% to 30%, supporting receptor-mediated endocytosis mechanism. The in vivo biodistribution studies in human hepatoma SMMC-7721 tumor-bearing nude mice displayed that Gal20-PTX-CLMs resulted in significantly enhanced drug accumulation in the tumors over non-targeting PTX-CLM counterpart. In accordance, Gal20-PTX-CLMs caused much greater tumor growth inhibition than non-targeting PTX-CLMs as well as non-crosslinking Gal20-PTX-NCLM controls (average tumor volume: ca. 35mm(3)versus 144mm(3) and 130mm(3), respectively). Histological analysis showed that Gal20-PTX-CLMs induced more extensive apoptosis of tumor cells while less damage to normal liver and kidney compared to Taxol. Ligand-installed photo-crosslinked pH-responsive degradable micelles have a great potential for targeted cancer chemotherapy.

  6. An open randomized active-controlled clinical trial with low-dose SKA cytokines versus DMARDs evaluating low disease activity maintenance in patients with rheumatoid arthritis

    PubMed Central

    Martin-Martin, LS; Giovannangeli, F; Bizzi, E; Massafra, U; Ballanti, E; Cassol, M; Migliore, A

    2017-01-01

    Background Biologic agents are currently the strongest immunosuppressive drugs able to induce remission in rheumatoid arthritis (RA). One of the objectives of the medical scientific community now is how to maintain remission or low disease activity (LDA). The aim of this trial is to evaluate the contribution of low-dose sequential kinetic activation (SKA) IL-4, IL-10, and anti-IL-1 antibodies (10 fg/mL) in patients affected by RA in maintaining LDA or remission obtained after biological therapy. Method This is a randomized, open, active-controlled, prospective, Phase IV trial. Disease activity score (DAS28), clinical disease activity index, simplified disease activity index, erythrocyte sedimentation rate and C-reactive protein levels, global health assessment, and pain visual analog scale were evaluated at baseline visit and then every 3 months together with an assessment of side effects till 12 months. Thirty-nine RA patients were enrolled and randomized to continue disease-modifying antirheumatic drugs (DMARDs) therapy or to receive a combination of SKA low-dose cytokines formulated in concentration of 10 fg/mL orally administered at a dose of 20 drops/d for 12 consecutive months. Results The rate of maintenance of LDA at 12 months was superior in the group treated with low-dose cytokines compared with patients treated with DMARDs, 66.7% and 42.1%, respectively; however, the difference between the groups was not statistically significant. No side effects were reported in both groups. Conclusion This is the first study using a combination of three low-dose cytokines in RA, after data published on psoriasis. These data suggest that the use of a combination of low-dose SKA cytokines may be an opportunity to explore in the management of RA.

  7. A New Standard Installation Method of the Offline Seismic Observation Station in Heavy Snowfall Area of Tohoku Region

    NASA Astrophysics Data System (ADS)

    Hirahara, S.; Nakayama, T.; Hori, S.; Sato, T.; Chiba, Y.; Okada, T.; Matsuzawa, T.

    2015-12-01

    Soon after the 2011 Tohoku earthquake, seismic activity of Tohoku region, NE Japan is induced in the inland area of Akita prefecture and the border area between Fukushima and Yamagata prefectures. We plan to install a total of 80 offline seismic observation stations in these areas for studying the effect of megathrust earthquake on the activities of inland earthquakes. In our project, maintenance will be held twice-a-year for 4 years from 2015 by using 2.0Hz short-period 3-component seismometer, KVS-300 and ultra-low-power data logger, EDR-X7000 (DC12V 0.08W power supply). We installed seismometer on the rock surface or the slope of the natural ground at the possible sites confirmed with low noise level to obtain distinct seismic waveform data. We report an improvement in installation method of the offline seismic observation station in the heavy snowfall area of Tohoku region based on the retrieved data. In the conventional method, seismometer was installed in the hand-dug hole of a slope in case it is not waterproof. Data logger and battery were installed in the box container on the ground surface, and then, GPS antenna was installed on the pole fixed by stepladder. There are risks of the inclination of seismometer and the damage of equipment in heavy snowfall area. In the new method, seismometer is installed in the robust concrete box on the buried basement consists of precast concrete mass to keep its horizontality. Data logger, battery, and GPS antenna are installed on a high place by using a single pole with anchor bolt and a pole mount cabinet to enhance their safety. As a result, total costs of installation are kept down because most of the equipment is reusable. Furthermore, an environmental burden of waste products is reduced.

  8. Paranal maintenance and CMMS experience

    NASA Astrophysics Data System (ADS)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  9. Maintenance and Monitoring of BMPS

    EPA Science Inventory

    Two best management practice (BMP) sites in the Staten Island Bluebelt in Richmond Creek Watershed are Richmond Creek 5 (RC-5) and Richmond Creek 4 (RC-4). This presentation includes site description, briefing of initial monitoring activity, representative maintenance activity, ...

  10. Installation and through-life operation issues for fiber optic components and systems in aircraft applications

    NASA Astrophysics Data System (ADS)

    White, Henry; Proudley, Geoff; Charlton, D. Wez; Kazemi, Alex A.

    2012-06-01

    Installation of fiber optic communication systems on aircraft is very challenging, particularly in military fighters requiring tight confinement. The issues to be addressed include developing an installation approach compatible with maintenance and through-life support whilst having affordable upfront costs. This applies both to the passive harness components (cable and connectors) and to active transceivers. In this paper we discuss the challenges for cable, connector, and transceiver installations and the system implications for civil and military platforms. This paper further demonstrates how an innovative approach to sub-system testing can help to de-risk technology by simulating installation environments in the laboratory and verifying through-life performance. Furthermore, testing of fiber optic cable in the laboratory with prototype components, representative cable lengths, routing and number of connector breaks, and even harness abuse is elaborated upon. A technique was devised using the BAE Systems Optical System and Component Assessment Rig (OSCAR) to evaluate through life operation. This report also shows prototype testing for typical fiber optic harnesses (during build) and the environmental conditions faced on aerospace platforms. Transceiver installation options (integrated onto processor boards, use of daughter PCBs, active connectors and active cables) are discussed and sub-system test setups are described. Results show how test data is used to assess subsystems: passive components have been tested over the -55 °C to +125 °C temperature range and active components over the -40 °C to +80 °C region. In addition, Gigabit Ethernet data is shown operating over the representative hardware with the results tabulated and shown in this paper. The implications for anticipated aircraft installations are summarized.

  11. Reliability Centered Maintenance: the EDF's Experience

    SciTech Connect

    Huyart, Thierry; Degrave, Claude; Dubreuil-Chambardel, Alain

    2002-07-01

    In order to ensure safest possible operation and to get best overall economic performance of its Nuclear Power Plants, 10 years ago Electricite de France launched a Reliability Centered Maintenance (RCM) project (the so-called OMF Methodology in French) to optimize the preventive maintenance programs, while keeping safety at the right level required. The principles underlying the RCM approach are based on common sense: failures must be prevented by preventive maintenance operations in all cases when the repercussions for the installation could be serious or critical in term of safety, availability or maintenance costs. The new preventive maintenance programs are presently almost completed and progressively implemented. Here and now, the implementation of the RCM approach allows to emphasize some benefits in the fields of costs, safety availability and maintenance culture. (authors)

  12. Maintenance Resources by Building Use for Installations in Germany

    DTIC Science & Technology

    1991-11-01

    SHOP UG 21900 21912 TIMBR TREAT FAC UG 21900 21920 FE FACILITY UG 21900 21922 ENTOMOLOGY FAC UG 21900 44228 INSECTICIDE STR UG 400 SUPPLY FACILITIES UG...FACILITY GW 74010 74026 ENTERTAINMENT WORKSHOP GW 74010 74027 DRAMA CENTER GW 74010 74043 MUSIC CENTER GW 74010 74076 THEATER W/DRSRM GW 74010 74077...74024 AUTO CRAFTS CENTER 74024 G7 74025 CONT EDUCATION FAC 74025 G2 74026 DRAMA CENTER 74010 GW 74027 MUSIC CENTER 74010 GW 74028 PHYSICAL FITNESS CENTER

  13. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... waters where a Coast Guard-certified marine sanitation device permitting discharge is allowed...

  14. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... waters where a Coast Guard-certified marine sanitation device permitting discharge is allowed...

  15. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... quantity of fuel required. (11) The duration of the operating cycle for unitized incinerating devices. (12... requirements of § 159.53. (13) Whether the device is designed to operate in salt, fresh, or brackish water....

  16. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quantity of fuel required. (11) The duration of the operating cycle for unitized incinerating devices. (12... requirements of § 159.53. (13) Whether the device is designed to operate in salt, fresh, or brackish water....

  17. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... quantity of fuel required. (11) The duration of the operating cycle for unitized incinerating devices. (12... requirements of § 159.53. (13) Whether the device is designed to operate in salt, fresh, or brackish water....

  18. Remediation of language processing in aphasia: Improving activation and maintenance of linguistic representations in (verbal) short-term memory

    PubMed Central

    Kalinyak-Fliszar, Michelene; Kohen, Francine; Martin, Nadine

    2012-01-01

    Background Verbal short-term memory (STM) impairments are invariably present in aphasia. Word processing involves a minimal form of verbal STM, i.e., the time course over which semantic and phonological representations are activated and maintained until they are comprehended, produced, or repeated. Thus it is reasonable that impairments of word processing and verbal STM may co-occur. The co-occurrence of language and STM impairments in aphasia has motivated an active area of research that has revealed much about the relationship of these two systems and the effect of their impairment on language function and verbal learning (Freedman & Martin, 2001; Martin & Saffran, 1999; Trojano & Grossi, 1995). In keeping with this view a number of researchers have developed treatment protocols to improve verbal STM in order to improve language function (e.g., Koenig-Bruhin & Studer-Eichenberger, 2007). This account of aphasia predicts that treatment of a fundamental ability, such as STM, which supports language function, should lead to improvements that generalise to content and tasks beyond those implemented in treatment. Aims We investigated the efficacy of a treatment for language impairment that targets two language support processes: verbal short-term memory (STM) and executive processing, in the context of a language task (repetition). We hypothesised that treatment of these abilities would improve repetition abilities and performance on other language tasks that require STM. Method A single-participant, multiple-baseline, multiple-probe design across behaviours was used with a participant with conduction aphasia. The treatment involved repetition of words and nonwords under three “interval” conditions, which varied the time between hearing and repeating the stimulus. Measures of treatment effects included acquisition, maintenance, and follow-up data, effect sizes, and pre- and post-treatment performance on a test battery that varies the STM and executive function

  19. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    SciTech Connect

    Pieck, Martin; Erickson, John E; Gulley, Mark S; Jones, Kevin W; Rybarcyk, Larry J

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  20. Horticulture: Grounds Maintenance Employee.

    ERIC Educational Resources Information Center

    Sims, James; And Others

    The unit of individualized learning activities is designed to provide training in grounds maintenance. The materials in the unit are divided into two sections. The developmental or preliminary phase (15 pages) is for use by the instructor and includes brief descriptions of the job and of the student population, along with listings of the specific…

  1. TCMS operations and maintenance philosophy

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Griffin, Rock E.

    1992-01-01

    The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

  2. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  3. Blanket Biological Review for General Maintenance Activities within Active Burial Grounds, 200 E and 200 W Areas, ECR No. 99-200-042

    SciTech Connect

    Brandt, Charles A.

    1999-04-30

    No plant and animal species protected under the Endangered Species Act, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The stalked pod and crouching milkvetchs are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for plant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, a nd 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground, the entire 218-E-10 burial ground, and the 218-W-6 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadow larks, horned larks, and curlews will nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). If vegetation removal is required prior to August 1999 or after 1 April 2000, please contact the ECAP staff for an additional analysis to ensure compliance with the Migratory Bird Treaty Act.

  4. Prediction of attendance at fitness center: a comparison between the theory of planned behavior, the social cognitive theory, and the physical activity maintenance theory.

    PubMed

    Jekauc, Darko; Völkle, Manuel; Wagner, Matthias O; Mess, Filip; Reiner, Miriam; Renner, Britta

    2015-01-01

    In the processes of physical activity (PA) maintenance specific predictors are effective, which differ from other stages of PA development. Recently, Physical Activity Maintenance Theory (PAMT) was specifically developed for prediction of PA maintenance. The aim of the present study was to evaluate the predictability of the future behavior by the PAMT and compare it with the Theory of Planned Behavior (TPB) and Social Cognitive Theory (SCT). Participation rate in a fitness center was observed for 101 college students (53 female) aged between 19 and 32 years (M = 23.6; SD = 2.9) over 20 weeks using a magnetic card. In order to predict the pattern of participation TPB, SCT and PAMT were used. A latent class zero-inflated Poisson growth curve analysis identified two participation patterns: regular attenders and intermittent exercisers. SCT showed the highest predictive power followed by PAMT and TPB. Impeding aspects as life stress and barriers were the strongest predictors suggesting that overcoming barriers might be an important aspect for working out on a regular basis. Self-efficacy, perceived behavioral control, and social support could also significantly differentiate between the participation patterns.

  5. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation traffic codes. 634.25 Section 634... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for...

  6. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation traffic codes. 634.25 Section 634... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for...

  7. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25... codes. (a) Installation or activity commanders will establish a traffic code for operation of motor vehicles on the installation. Commanders in overseas areas will establish a traffic code, under...

  8. Space Station: Improving NASA's planning for external maintenance. Report to the Chair, Government Activities and Transportation Subcommittee, Committee on Government Operations, and House of Representatives

    NASA Astrophysics Data System (ADS)

    1992-07-01

    In 1996, NASA plans to begin assembly of the international Space Station Freedom in low earth orbit. One of the greatest challenges facing NASA will be maintaining the Space Station's external components throughout the assembly period and over its anticipated 30-year life using astronauts to perform extravehicular activity (EVA). The amount of EVA that can be performed is limited, and the activity is inherently risky, given the harsh environment of space. The United States General Accounting Office (GAO) review of NASA's efforts to determine the Space Station's EVA maintenance requirements and its plans to meet those requirements is presented.

  9. Digital Sculpture Installations

    ERIC Educational Resources Information Center

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  10. Solenoidal Magnet Installation

    SciTech Connect

    Stredde, H.; Lee, A.; /Fermilab

    1998-01-21

    The major modification to the D0 detector for the next physics collider run is the upgrade of the central tracking system. The first component to be installed will be the solenoid magnet, with the central pre-shower attached. This engineering note is directed to the installation of the solenoid magnet and the equipment needed to accomplish this task. As part of the installation process, the main detector must undergo a change in position of one of its major components, namely the South End Calorimeter (SEC). This calorimeter must be completely decoupled from the main detector, i.e. all cabling and cryo lines removed. The equipment used for installing all calorimeters (bridge and support structures) will be put into position and the calorimeter (SEC) will be pulled off of the detector center beam and parked on the south sidewalk of the D0 Assembly Hall. The necessary cryo lines will re-connected in order to keep the cryostat cold. This calorimeter will remain here during the greater portion of the upgrade reconfiguration schedule. When this task is finished, the old central tracking system and its mounts will be removed from the bore of the Central Calorimeter (CC). The main detector is now ready to receive the new tracking system, starting with the solenoid magnet.

  11. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  12. BLANKET BIOLOGICAL REVIEW FOR GENERAL MAINTENANCE ACTIVITIES WITHIN ACTIVE BURIAL GROUNDS, 200 E and 200 W Areas, ECR No.2001-200-048

    SciTech Connect

    Sackschewsky, Michael R.

    2002-05-08

    No plant and animal species protected under the ESA, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy may still occur in some of the burial grounds. This is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The Ecological Compliance Assessment Project (ECAP) staff should consulted prior to the initiation of major work activities within areas where this species has been identified (218-E-12, 218-E-10). The stalked-pod and crouching milkvetch are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for plant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, and 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground, the entire 218-E-10 burial ground, and the 218-W-6 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadow larks, horned larks, and curlews will nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). This blanket review does not apply to the portions of 218-W-4C, and 218-W-6 previously described.

  13. BLANKET BIOLOGICAL REVIEW FOR GENERAL MAINTENANCE ACTIVITIES WITHIN ACTIVE BURIAL GROUNDS, 200 E and 200 W Areas, ECR No. 2002-200-034

    SciTech Connect

    Sackschewsky, Michael R.

    2003-06-26

    No plant and animal species protected under the ESA, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy may still occur in some of the burial grounds. This is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The Ecological Compliance Assessment Project (ECAP) staff should consulted prior to the initiation of major work activities within areas where this species has been identified (218-E-12, 218-E-10). The stalked-pod and crouching milkvetch are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for pl ant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, and 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground, the entire 218-E-10 burial ground, and the 218-W-6 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadow larks, horned larks, and curlews will nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). This blanket review does not apply to the portions of 218-W-4C, and 218-W-6 previously described.

  14. BLANKET BIOLOGICAL REVIEW FOR GENERAL MAINTENANCE ACTIVITIES WITHIN ACTIVE BURIAL GROUNDS, 200 E and 200 W Areas, ECR #2000-200-013

    SciTech Connect

    Sackschewsky, Michael R.

    2002-04-04

    No plant and animal species protected under the ESA, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy may still occur in some of the burial grounds. This is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The Ecological Compliance Assessment Project (ECAP) staff should consulted prior to the initiation of major work activities within areas where this species has been identified (218-E-12, 218-E-10). The stalked-pod and crouching milkvetch are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for plant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, and 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground, the entire 218-E-10 burial ground, and the 218-W-6 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadow larks, horned larks, and curlews will nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). This blanket review does not apply to the portions of 218-W-4C, and 218-W-6 previously described.

  15. Linac cryogenic distribution system maintenance and upgrades at JLab

    NASA Astrophysics Data System (ADS)

    Dixon, K.; Wright, M.; Ganni, V.

    2014-01-01

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm3 of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  16. Linac cryogenic distribution system maintenance and upgrades at Jlab

    SciTech Connect

    Dixon, Kelly D.; Wright, Mathew C.; Ganni, Venkatarao

    2014-01-01

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  17. Linac cryogenic distribution system maintenance and upgrades at JLab

    SciTech Connect

    Dixon, K.; Wright, M.; Ganni, V.

    2014-01-29

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  18. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... automatic audible alarm in the wheelhouse together with an auxiliary audible alarm in the engine room. (b... audible alarm in the engine room. For installations contracted for on or after January 1, 1962, where... location of the various zones and giving instructions for the operation, maintenance, and testing of...

  19. Installation package maxi-therm S-101 heating module

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.

  20. 48 CFR 1852.245-77 - List of installation-accountable property and services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CLAUSES Texts of Provisions and Clauses 1852.245-77 List of installation-accountable property and services...) Building maintenance for facilities occupied by Contractor personnel. (j) Moving and hauling for...

  1. Mineral mining installations

    SciTech Connect

    Werner, G.; Wisniewski, P.

    1983-12-15

    A mineral mining installation serves to win mineral by explosive blasting. The installation employs a shuttle conveyor arranged alongside a mineral face. Roof supports stand side-by-side at the side of the conveyor remote from the conveyor. The roof supports are connected to the conveyor through shifting rams and have roof-engageable caps or the like supported on hydraulic props. The pans of the conveyor have upstanding walls at the rear side nearest the roof supports which carry rails at their upper ends. The roof caps have wall components pivoted thereto and hydraulic piston and cylinder units serve to swing the wall components up and down. When explosive blasting takes place the wall components are swung down to engage on the walls of the conveyor pans to form a screen between the winning region and the access region of the working.

  2. Maintenance Staffing Guidelines For Educational Facilities.

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    The purpose of this publication is to provide a resource or guide for educational facilities in establishing or developing a maintenance trades organization that is sufficient to accomplish basic facilities maintenance functions. The guidelines are intended to suggest staffing levels for those routine facilities maintenance activities that are…

  3. Blanket Biological Review for General Maintenance Activities Within Active Burial Grounds, 200 East and 200 West Areas, ECR No.2003-200-035

    SciTech Connect

    Sackschewsky, Michael R.

    2003-08-25

    No plant and animal species protected under the ESA, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy may still occur in some of the burial grounds (218-E-12, 218-E-10). This is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The stalked-pod and crouching milkvetch, Watch List species, are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for plant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, and 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground and the entire 218-E-10 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadowlarks, horned larks, and curlews may nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). If vegetation removal is required prior to August 2003 or after 1 April 2004, please contact the ECAP staff for an additional analysis to ensure compliance with the Migratory Bird Treaty Act. Workers should be advised to watch for nesting birds within the burial grounds, if any are encountered, please contact the ECAP

  4. Engineering and Installation Services

    DTIC Science & Technology

    2007-11-02

    Update data on existing communications and information systems on the Communica- tions and Information Systems Installation Records ( CSIR ) according to...information by two different survey methods: desk top and on-site. 4.9.1.1. Perform desktop surveys by using CSIRs , available data, and telephone...and equipment. 4.15. Project Drawings . Upon project completion, the team chief annotates two sets of CSIR drawings. The team chief leaves one set with

  5. Leadership for Sustainable Installations

    DTIC Science & Technology

    2011-04-01

    Doppelt, B. (2010). Leading change toward sustainability: a change-management guide for business, government and civil society , 2nd edition. [ Books24x7 ...social, environmental and economic impacts. [ Books24x7 version]. San Francisco: Berrett-Koehler Publishers. Journal of Installation Management Spring...Strategy for sustainability: a business manifesto [ Books24x7 version]. Cambridge, MA: Harvard Business Press. Retrieved from http://common.books24x7.com/book/id_31212/book.asp

  6. Installation Strategic Planning Guidebook

    DTIC Science & Technology

    2012-05-01

    team members can hear each other and not be distracted by outside noise • Access to bathrooms, snacks , beverages • Note the plenary room can often...workshop. The stakeholders are working hard over the 2.5 days, and easy access to beverages, Installation Strategic Planning Guidebook 50 snacks ...for snacks and beverages. In several cases, Garrisons have also arranged for lunch orders (placed and paid for by participants) to be delivered (with

  7. Samus Toroid Installation Fixture

    SciTech Connect

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  8. Flight Crew Health Maintenance

    NASA Technical Reports Server (NTRS)

    Gullett, C. C.

    1970-01-01

    The health maintenance program for commercial flight crew personnel includes diet, weight control, and exercise to prevent heart disease development and disability grounding. The very high correlation between hypertension and overweight in cardiovascular diseases significantly influences the prognosis for a coronary prone individual and results in a high rejection rate of active military pilots applying for civilian jobs. In addition to physical fitness the major items stressed in pilot selection are: emotional maturity, glucose tolerance, and family health history.

  9. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  10. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  11. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  12. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  13. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  14. Advanced servomanipulator remote maintenance demonstration

    SciTech Connect

    Ray, T.L.; Bradley, E.C.

    1989-03-01

    The advanced servomanipulator (ASM) is a dual-arm, force-reflecting, master/slave servomanipulator that was designed for remote maintenance applications and is digitally controlled. The ASM is installed in the Maintenance Systems Test Area (MSTA) of the Fuel Recycle Division at the Oak Ridge National Laboratory. The unique aspect of ASM is that the slave arms were designed to be remotely maintainable, using a similar remote manipulator system, to maximize availability and minimize downtime. This test report describes the results of the maintenance testing conducted on ASM. Demonstration of the ability to maintain ASM remotely is an important precursor to the ultimate application of ASM in a totally remote facility. The approach taken in the design of ASM was for the manipulator slave arms to be composed of modules capable of being removed and replaced by another manipulator system of similar capabilities. The ASM incorporates gear and torque tube drives with drive couplings that facilitate remote maintenance. Although the use of special fixtures is normally discouraged for remote maintenance, special fixtures were required for this demonstration due to the complex nature of the slave arms. This test was performed to demonstrate that the ASM slave arms could be completely disassembled and reassembled remotely. Maintenance of ASM was successfully demonstrated using the M-2 servomanipulator and special fixtures. The entire disassembly process took about 4 h, and the assembly took about 3 1/2 h. Although there were some problems, in general, the arm modules were adequately designed for remote removal and replacement. Recommendations, which are documented in this report, have been made for improvements. 5 refs., 22 figs., 1 tab.

  15. Maintenance Business Plans.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  16. Maintenance Management Update.

    ERIC Educational Resources Information Center

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  17. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  18. Seafloor manifold center installed

    SciTech Connect

    Edmiston, K.

    1982-07-01

    The Shell/Esso Underwater Manifold Center (UMC), designed and tested as a diverless production facility, is a significant step toward really deep water oil and gas production. In May 1982, the 2100 metric ton unit was towed 645 miles from its Dutch fabrication yard and precisely emplaced in 500 ft water in the Cormorant field in only 6 days. When fully installed with all of its wells drilled and testing completed, the UMC will have cost an estimated $700 million. During its anticipated 25 yr operating life, the UMC is expected to produce ca 110 million bbl from the central Cormorant area. Design and operational criteria are described.

  19. Mineral mining installation

    SciTech Connect

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  20. The stay-green phenotype of TaNAM-RNAi wheat plants is associated with maintenance of chloroplast structure and high enzymatic antioxidant activity.

    PubMed

    Checovich, Mariana L; Galatro, Andrea; Moriconi, Jorge I; Simontacchi, Marcela; Dubcovsky, Jorge; Santa-María, Guillermo E

    2016-07-01

    TaNAM transcription factors play an important role in controlling senescence, which in turn, influences the delivery of nitrogen, iron and other elements to the grain of wheat (Triticum aestivum) plants, thus contributing to grain nutritional value. While lack or diminished expression of TaNAMs determines a stay-green phenotype, the precise effect of these factors on chloroplast structure has not been studied. In this work we focused on the events undergone by chloroplasts in two wheat lines having either control or diminished TaNAM expression due to RNA interference (RNAi). It was found that in RNAi plants maintenance of chlorophyll levels and maximal photochemical efficiency of photosystem II were associated with lack of chloroplast dismantling. Flow cytometer studies and electron microscope analysis showed that RNAi plants conserved organelle ultrastructure and complexity. It was also found that senescence in control plants was accompanied by a low leaf enzymatic antioxidant activity. Lack of chloroplast dismantling in RNAi plants was associated with maintenance of protein and iron concentration in the flag leaf, the opposite being observed in control plants. These data provide a structural basis for the observation that down regulation of TaNAMs confers a functional stay-green phenotype and indicate that the low export of iron and nitrogen from the flag leaf of these plants is concomitant, within the developmental window studied, with lack of chloroplast degradation and high enzymatic antioxidant activity.

  1. Seal ring installation tool

    NASA Technical Reports Server (NTRS)

    Haselmaier, L. Haynes (Inventor)

    2004-01-01

    A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

  2. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  3. Radiator Design and Installation

    NASA Technical Reports Server (NTRS)

    Brevoort, M.J.; Leifer, M.

    1939-01-01

    The fundamental principles of fluid flow, pressure losses, and heat transfer have been presented and analyzed for the case of a smooth tube with fully developed turbulent flow. These equations apply to tubes with large length-diameter ratios where the f1ow is at a high Reynolds Number. The error introduced by using these equations increases as the magnitude of the tube length and the air-flow Reynolds Number approaches the values encountered in modern radiator designs. Accordingly, heat-transfer tests on radiator sections were made and the results are presented in nondimensional form to facilitate their use and for comparison with other heat-transfer data. In addition, pressure losses were measured along smooth tubes of circular, square, and rectangular cross section and the results were also correlated and are presented in nondimensional form. The problem of a radiator design for a particular installation is solved, the experimental heat-transfer and pressure-loss data being used, on a basis of power chargeable to the radiator for form drag, for propelling the weight, and for forcing the air through the radiator. The case of an installation within a wing or an engine nacelle is considered. An illustration of radiator design is carried through for an arbitrary set of conditions. Sufficient detail is given to enable the reader to reproduce the analysis for any given case.

  4. VIRUS early installation and commissioning

    NASA Astrophysics Data System (ADS)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  5. Recent Changes to ABR Maintenance of Certification Part 4 (PQI): Acknowledgment of Radiologists' Activities to Improve Quality and Safety.

    PubMed

    Donnelly, Lane F; Mathews, Vincent P; Laszakovits, David J; Jackson, Valerie P; Guiberteau, Milton J

    2016-02-01

    The ABR has recently reviewed and revised its policy establishing how ABR diplomates may comply with requirements for Maintenance of Certification Part 4: Practice Quality Improvement (PQI). The changes were deemed necessary by the Board of Trustees to acknowledge and credit the numerous ways in which radiology professionals contribute to improving patient care through existing and evolving activities available to them within the radiology community. In addition to meeting requirements by completing a traditional PQI project, the policy revision now allows diplomates to meet criteria by completing one of a number of activities in an expanded spectrum of PQI options recognized by the ABR. The new policy also acknowledges the maturing state of quality improvement science by permitting PQI projects to use "any standard quality improvement methodology," such as Six Sigma, Lean, the Institute for Healthcare Improvement's Model for Improvement, and others in addition to the previously prescribed three-phase plan-do-study-act format.

  6. System Engineering Analysis of Compressed Air Systems Installed on LHA-1 and LPH-2 Class Ships,

    DTIC Science & Technology

    1982-07-01

    Corrosion ....... .................... 3-10 3.3 Maintenance Requirement Identification . ......... . 3-10 3.3.1 Ship Service Low-Pressure Air Compressor...screening the maintenance history profiles developed in Task 1. Screening of the maintenance history profiles had tw. major objectives: * Identification ...designs of the functionally similar equip- ments installed on the ship classes examined. * Identification of recurring failure modes or problems that are

  7. 340 Facility maintenance implementation plan

    SciTech Connect

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  8. Delayed activation of spinal microglia contributes to the maintenance of bone cancer pain in female Wistar rats via P2X7 receptor and IL-18.

    PubMed

    Yang, Yan; Li, Hui; Li, Ting-Ting; Luo, Hao; Gu, Xi-Yao; Lü, Ning; Ji, Ru-Rong; Zhang, Yu-Qiu

    2015-05-20

    Accumulating evidence suggests that activation of spinal microglia contributes to the development of inflammatory and neuropathic pain. However, the role of spinal microglia in the maintenance of chronic pain remains controversial. Bone cancer pain shares features of inflammatory and neuropathic pain, but the temporal activation of microglia and astrocytes in this model is not well defined. Here, we report an unconventional role of spinal microglia in the maintenance of advanced-phase bone cancer pain in a female rat model. Bone cancer elicited delayed and persistent microglial activation in the spinal dorsal horn on days 14 and 21, but not on day 7. In contrast, bone cancer induced rapid and persistent astrocytic activation on days 7-21. Spinal inhibition of microglia by minocycline at 14 d effectively reduced bone cancer-induced allodynia and hyperalgesia. However, pretreatment of minocycline in the first week did not affect the development of cancer pain. Bone cancer increased ATP levels in CSF, and upregulated P2X7 receptor, phosphorylated p38, and IL-18 in spinal microglia. Spinal inhibition of P2X7/p-38/IL-18 pathway reduced advanced-phase bone cancer pain and suppressed hyperactivity of spinal wide dynamic range (WDR) neurons. IL-18 induced allodynia and hyperalgesia after intrathecal injection, elicited mechanical hyperactivity of WDR neurons in vivo, and increased the frequency of mEPSCs in spinal lamina IIo nociceptive synapses in spinal cord slices. Together, our findings demonstrate a novel role of microglia in maintaining advanced phase cancer pain in females via producing the proinflammatory cytokine IL-18 to enhance synaptic transmission of spinal cord nociceptive neurons.

  9. Mild hyperoxia limits hTR levels, telomerase activity, and telomere length maintenance in hTERT-transduced bone marrow endothelial cells.

    PubMed

    Napier, Christine E; Veas, Laura A; Kan, Chin-Yi; Taylor, Lisa M; Yuan, Jun; Wen, Victoria W; James, Alexander; O'Brien, Tracey A; Lock, Richard B; MacKenzie, Karen L

    2010-10-01

    Reactivation of telomerase in endothelial cells (ECs) may be an effective approach to the treatment of vascular disorders associated with telomere attrition and EC senescence. However, overexpression of human telomerase reverse transcriptase (hTERT) does not prevent net telomere loss in ECs grown in standard culture medium with exposure to atmospheric oxygen (21% O(2)). Since these culture conditions are hyperoxic relative to normal tissue in vivo, where oxygen tension is estimated to be 1%-6%, we examined the effects of reduced exposure to oxidative stress (OS) on telomere length maintenance in hTERT-transduced bone marrow endothelial (BMhTERT) cells. Propagation of BMhTERT cells in the free radical scavenger, tert-butylhydroxylamine (tBN), and/or in 5% O(2) increased telomerase enzyme activity and facilitated telomere length maintenance. The enhancement of telomerase activity correlated with higher levels of the telomerase RNA component (hTR). We also investigated the role of the telomere binding protein, TRF1, in telomere length regulation under alternate OS conditions. Inhibition of TRF1 function had no effect on telomere length in BMhTERT cells grown under standard culture conditions. However, alleviation of OS by growth in tBN plus 5% O(2), elevated hTR levels, enhanced telomerase enzyme activity, and enabled progressive telomere lengthening. The direct impact of hTR levels on telomerase-mediated telomere lengthening was demonstrated by overexpression of hTR. BMhTERT cells transduced with hTR exhibited very high telomerase enzyme activity and underwent dramatic telomere lengthening under standard culture conditions. Overall, these results demonstrate that hTR levels are reduced by mild hyperoxia and limit telomerase-mediated telomere lengthening in hTERT-transduced ECs.

  10. Maintenance Matters: Maintenance and Minor Works in Primary Schools. A Manual for Boards of Management.

    ERIC Educational Resources Information Center

    Department of Education and Science, Dublin (Ireland).

    This manual provides guidance in the maintenance requirements of primary education schools in Ireland, covering: roofing; floors and walls; doors and windows; external and internal finishes; heating, plumbing, and drainage; electrical installations; paved and grassed surfaces; and furniture and loose equipment. The basic considerations are covered…

  11. Ergonomics in designing process: dialogue between designers, executors and users in the maintenance activity of radars in an oil refinery.

    PubMed

    Menegon, Fabrício Augusto; Rodrigues, Daniela da Silva; Fontes, Andréa Regina Martins; Menegon, Nilton Luiz

    2012-01-01

    This paper aims to discuss the role of ergonomics in design process using the dialogue developed by designers, implementers and users in an oil refinery. It was possible to identify the need of minimizing the postural constraints, risk of accidents, mechanical shocks and to enlarge safety perception in the access and permanency of the users at the workspace. It has been determined and validated by workers and managers to implement different deadlines depending on programming, viability and execution time for the improvements proposed. In a long-term: it was proposed the substitution of the ladders with time planning according to the maintenance program of the tanks; in a short-time: it was suggested the expansion of the existing platforms, implementation of a walkway connection provided with guardrails between the upper access of the side ladder and the repositioning of radar set and aerial aiming at the usage by workers at the workstation of the new platform. It was also elaborated eight typologies of intervention, according to the request, type of tank, material stored, and its setting place. The design process arises from ergonomics workplace analysis that presents concepts for solutions which was a mediator tool to be settled between users and implementers.

  12. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  13. Horizontal pumping system installed at East Texas gas plant

    SciTech Connect

    Lopez, M.; Goodwin, B.

    1998-07-20

    Installation of horizontal, multistage centrifugal pumps in lean-amine service has proven successful and economical at Union Pacific Resources (UPR) East Texas gas plant (ETGP), Carthage, Tex. In the past, UPR had used either vertical can pumps or positive displacement (PD) pumps for amine circulation in gas-treating operations. When the need to replace a PD pump in the No. 4 amine plant arose, UPR solicited bids from both traditional pump suppliers. Additionally, UPR solicited a bid from REDA for its horizontal pumping system (HPS) based on previous success of this type of pump at ETGP for saltwater disposal. The first pump was installed in May 1996 and designed to circulate a maximum of 80 gpm. Since installation of the pump in No. 4 amine-treating unit, UPR has experienced no downtime and realized a significant cost savings on maintenance labor and parts over the previous positive displacement installation. The success of this HPS in amine service has led UPR to invest in five additional HPS pumps for ETGP`s amine service. The paper describes the decision, economics, pumping systems, preventive maintenance, and post installation performance.

  14. Solar heating system installed at Troy, Ohio. Final report

    SciTech Connect

    1980-09-01

    This document is the Final Report of the Solar Energy System located at Troy-Miami County Public Library, Troy, Ohio. The completed system is composed of tree basic subsystems: the collector system consisting of 3264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which includes a 5000-gallon insulated steel tank; and the distribution and control system which includes piping, pumping and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and is, therefore, a retrofit system. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  15. Rotary feeding system for metallic coating installation by electrodeposition

    NASA Astrophysics Data System (ADS)

    Stănescu, A.; Alecusan, A. M.; Dimitescu, A.

    2016-08-01

    The paper aims to present an alternative feeding system for metallic coatings lines by electrodeposition which lends itself to the circular arrangement of the cuvettes used in such plants. The novelty lies both, in the arrangement of the electrodeposition installation components and mechanical feeding and transport system for parts to be electrodeposited. The control and actuation system of this type of installation simplifies. Nevertheless, all these increase the system reliability and run lower maintenance costs, without adversely affecting the quality of the end product. The paper presents the justification for reducing the total energy consumption in the electrodeposition process, too.

  16. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  17. Activation of AMPK protects against hydrogen peroxide-induced osteoblast apoptosis through autophagy induction and NADPH maintenance: new implications for osteonecrosis treatment?

    PubMed

    She, Chang; Zhu, Lun-qing; Zhen, Yun-fang; Wang, Xiao-dong; Dong, Qi-rong

    2014-01-01

    Elevated hydrogen peroxide (H2O2) causes osteoblast dysfunction and apoptosis, serving as an important contributor to the development of osteonecrosis. Here we aimed to understand the role of AMP-activated protein kinase (AMPK) in the process. We observed a high level of AMPK activation in surgery isolated patients' osteonecrosis tissues. In cultured osteoblastoma MG63 cells, H2O2 stimulation induced significant AMPK activation, oxidative stress, cell death and apoptosis. Inhibition of AMPK by its inhibitor (compound C) or by shRNA-mediated knockdown dramatically enhanced H2O2-induced MG63 cell apoptosis, while over-expression of AMPK in HEK-293 cells alleviated H2O2-induced cell damage. These results confirmed that H2O2-activated AMPK is pro-cell survival. We observed that H2O2 induced protective autophagy in MG63 cells, and AMPK-dependent Ulk1 activation and mTORC1 (mTOR complex 1) inactivation might involve autophagy activation. Further, AMPK activation inhibited H2O2-induced oxidative stress, probably through inhibiting NADPH (nicotinamide adenine dinucleotide phosphate) depletion, since more NADPH depletion and oxidative stress were induced by H2O2 in AMPK deficient MG63 cells. Finally, we observed a significant AMPK activation in H2O2-treated primary cultured and transformed (MC3T3-E1) osteoblasts, and AMPK inhibitor compound C enhanced death by H2O2 in these cells. Based on these results, we concluded that H2O2-induced AMPK activation is pro-survival and anti-apoptosis in osteoblasts. Autophagy induction and NADPH maintenance are involved in AMPK-mediated pro-survival effects. AMPK might represent a novel molecular target for osteonecrosis treatment.

  18. Data sharing report characterization of population 7: Personal protective equipment, dry active waste, and miscellaneous debris, surveillance and maintenance project Oak Ridge National Laboratory Oak Ridge, Tennessee

    SciTech Connect

    Harpenau, Evan M.

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

  19. Nuclear reactor installation

    SciTech Connect

    Straub, H.

    1987-09-29

    A nuclear reactor installation is described comprising a pressure vessel having a pair of concentric walls defining a peripheral chamber therebetween; a reactor core disposed within the pressure vessel for heating a primary coolant; a cooling circuit for conveying a secondary coolant in heat exchange relation with the primary coolant. The circuit includes at least one primary heat exchanger within the pressure vessel, at least one secondary heat exchanger outside the pressure vessel, coolant lines extending through the pressure vessel and connecting the heat exchanges together, and circulating means for circulating a secondary coolant through the heat exchangers; a heat sink extending around the pressure vessel; a source of at least one flowable heat-insulating agent outside the pressure vessel; a source of at least one flowable heat-conductive agent outside the pressure vessel; first means communicating the source of heat-insulating agent with the peripheral chamber during normal operation of the reactor core; and second means communicating the source of heat-conductive agent with the peripheral chamber to fill the chamber with heat-conductive agent in response to a disturbance in reactor core cooling.

  20. Longwall mineral mining installation

    SciTech Connect

    Becker, K.; Beyer, H.

    1982-09-14

    A longwall mineral mining installation comprises a scraper-chain conveyor having a scraper assembly, a first straight conveyor portion extending along the longwall working, a second straight conveyor portion extending along a roadway positioned at one end of the longwall working, and a curved conveyor section connecting the two straight conveyor portions. A guide assembly is provided for guiding the scraper assembly around the curved conveyor section. A guide is fixed to the face side of the first straight conveyor portion, and a winning machine is reciprocable along the guide. A drive station is mounted on the goaf side of the first straight conveyor portion in the region of the curved conveyor section. A drive sprocket is rotatably mounted on the face side of the first straight conveyor portion in said region. The drive sprocket drives the winning machine via a drive chain. A drive shaft drivably connects the drive station and the drive sprocket. The drive station includes a drive motor whose axis of rotation is substantially parallel to the longitudinal axis of the first straight conveyor portion, and the guide is angled away from the first straight conveyor portion in said region.

  1. Characterization of Active Anthocyanin Degradation in the Petals of Rosa chinensis and Brunfelsia calycina Reveals the Effect of Gallated Catechins on Pigment Maintenance.

    PubMed

    Luo, Honghui; Deng, Shuangfan; Fu, Wei; Zhang, Xin; Zhang, Xuelian; Zhang, Zhaoqi; Pang, Xuequn

    2017-03-25

    Anthocyanin degradation decreases ornamental or nutritional values of horticultural products. To investigate factors that may influence colour change in flower development, anthocyanin degradation was compared between the flowers of Brunfelsia calycina and Rosa chinensis, which show rapid and slow degradation, respectively. In-gel activity assays, high performance liquid chromatography (HPLC) analysis of tannins, enzyme kinetics measurement and immune-detection of anthocyanin degradation related-perioxidases (PODs) were carried out for the comparison. Rose petals possessed significantly lower anthocyanin degradation-related POD activities than Brunfelsia petals, which may be related to the high tannin contents. Epicatechin gallate (ECG) and gallocatechin gallate (GCG) were detected in rose as 161.3 ± 12.34 and 273.56 ± 41.23 μg/g FW (Fresh Weight) respectively, while not detected in Brunfelsia. ECG and GCG inhibited the activities of the Brunfelsia POD with half maximal inhibitory concentrations (IC50s) as 21.5 and 29.7 μM respectively, and increased the colour intensities of the anthocyanins. Catechin and epicatechin did not inhibit the POD activity, while serving as POD substrates, with Km (the Michaelis constant) as 0.48 and 1.23 mM. Similar protein levels of the anthocyanin degradation-related 40-kDa PODs were detected in Brunfelsia and rose. In summary, high amount of tannins, particularly ECG and GCG, in red rose petals may inhibit the degradation-related enzymes, leading to the maintenance of anthocyanins in vivo.

  2. [A PARADIGM SHIFT IN THE PERCEPTION OF HEALTH MAINTENANCE FROM INCREASING PHYSICAL ACTIVITY TO DECREASING PHYSICAL INACTIVITY].

    PubMed

    Rotman, Dani; Constantini, Naama

    2016-06-01

    Modern man spends most of his waking hours (50-70%) in one form or another of sedentary behavior, defined as activity conducted in a sitting or reclining position involving low energy expenditure. The remaining waking hours are spent performing low intensity physical activity (25-45%) and medium-high intensity physical activity (less than 5%): Despite this distribution, medical research has focused on the impact of increasing medium-high intensity physical activity and many health organizations' recommendations are in accordance. In recent years, research conducted has begun to examine the effect inactivity has on health and has shown that excess sedentary behaviour is an independent risk factor for a wide range of medical problems such as obesity, metabolic syndrome, poor cardiovascular health profile, diabetes mellitus, and possibly cancer. Although the higher risk brought on by sedentary behaviour is partially reduced by increasing medium-high intensity physical activity, it is not completely neutralized. One way to diminish the harm caused by long hours of sitting is to take short breaks during periods of prolonged sitting in order to walk. According to these findings, it is worthwhile to recommend reducing the hours spent in sedentary behaviour, or at least to take frequent short breaks ("activity snacks") during periods of prolonged sitting to get up and walk around.

  3. Establishing maintenance performance indicators

    SciTech Connect

    Baca, B.

    1994-10-01

    Maintenance Performance Indicators (PI) specify where the maintenance department is and which direction it is going allowing for a quick and accurate assessment of the performance of the Maintenance Management Program (MMP). Establishing PI`s for the maintenance department will allow a measure of productivity and a means of feedback for methods improvement. Effective performance of the maintenance department directly effects plant profitability. Improvements in the quality and productivity of the maintenance work force will significantly reduce maintenance costs. The level of performance attained by the maintenance work force is usually guessed at. Guessing will not identify areas needing improvement or help to initiate a corrective action. Maintenance PI`s are required for maintenance departments whose goal is to control maintenance costs while increasing productivity. The application of basic statistical methods will allow a maintenance department to know where they are and which direction they are going. The data presented in this paper is a representation of indicators used in industry as well as developed indicators to establish a complete maintenance performance indicator program. The methodology used in developing this program can be used as a way to manage a cost effective maintenance management program.

  4. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement Activities..., Maintenance and Replacement activities associated with the Wasatch County Water Efficiency Project (WCWEP). The WCWEP Operation, Maintenance, and Replacement Proposed Action includes: stabilizing canal...

  5. The design of a wireless batteryless biflash installation with high power LEDs

    NASA Astrophysics Data System (ADS)

    Cappelle, J.; De Geest, W.; Hanselaer, P.

    2011-05-01

    Adding flashlights at crosswalks may make these weak traffic points safer. Unfortunately plugging in traffic lights into the electrical grid is expensive and complex. This paper reports about the energetic, the electronic and the optical design and building of a wireless and batteryless biflash installation in the framework of a flemish SME supporting program. The energy is supplied by a small solar panel and is buffered by supercapacitors instead of batteries. This has the advantage of being maintenance free: the number of charge-discharge cycles is almost unlimited because there is no chemical reaction involved in the storage mechanism. On the other hand the limited energy storage capacity of supercapacitors requires a new approach for the system design. Based on the EN-12352 standard for warning light devices, all design choices were filled in to be as energy efficient as possible. The duty cycle and the light output of the high power led flashlights are minimized. The components for the electronic circuits for the led driver, the control and the RF communication are selected based on their energy consumption and power management techniques are implemented. A lot of energy is saved by making the biflash system active. The leds are only flashing on demand or at preprogrammed moments. A biflash installation is typically installed at both sides of a crosswalk. A call at one of the sides should result in flashing at both sides. To maintain the drag and drop principle, a wireless RF communication system is designed.

  6. Photovoltaic energy systems: Design and installation

    NASA Astrophysics Data System (ADS)

    Buresch, M.

    The characteristics of solar radiation, the design of solar cells, and the installation of Si solar cell arrays for various applications are described. The discussion is limited to medium-scale photovoltaic systems, from 0.1-100 kW peak output, mounted in fixed flat plate modules, the simplest, most maintenance-free concept. Solar cell functioning principles are outlined, including the parasitic mechanisms which reduce cell efficiency. The magnitude, variations, and distribution of the global solar energy input are quantified. Consideration is given to series and parallel connected solar arrays, and to performance under a variable load. Array protection and failure detection are explored, as are integrated array power conditioning equipment comprising energy storage, voltage regulation, and ac to dc converters. Attention is also devoted to array mounting and matching solar cell systems to load.

  7. Operation and maintenance cost data for residential photovoltaic modules/panels

    NASA Technical Reports Server (NTRS)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  8. Operation and maintenance cost data for residential photovoltaic modules/panels

    NASA Astrophysics Data System (ADS)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-07-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  9. Highlights in basic autonomic neurosciences: Is an increase in sympathetic nerve activity involved in the development and maintenance of hypertension?

    PubMed

    Wehrwein, Erica; Barman, Susan M

    2014-02-01

    The 21st century has brought renewed energy to the field of neural control of the cardiovascular system with interest in assessing directly the role of sympathetic nerve activity (SNA) in initiating and/or maintaining an elevated level of arterial pressure in animal models of cardiovascular disease and in human subjects. Below is a review of some recent studies that use continuous nerve recordings of SNA to look at the time course of changes in activity as hypertension develops. These studies have advanced our understanding of the role of SNA in hypertension, but they also leave us wanting to know more.

  10. Solar space and water heating system installed at Charlottesville, Virginia

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  11. Solar space and water heating system installed at Charlottesville, Virginia

    SciTech Connect

    Greer, Charles R.

    1980-09-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, consists of 88 single glazed, Sunworks Solector copper base plate collector modules; hot water coils in the hot air ducts; a domestic hot water (DHW) preheat tank; a 3,000 gallon concrete urethane-insulated storage tank and other miscellaneous components. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  12. Alternate transcripts of the Drosophila "activator" E2F are necessary for maintenance of cell cycle exit during development.

    PubMed

    Bradley-Gill, Mary-Rose; Kim, Minhee; Feingold, Daniel; Yergeau, Christine; Houde, Josée; Moon, Nam-Sung

    2016-03-15

    The E2F family of transcription factors are evolutionarily conserved regulators of the cell cycle that can be divided into two groups based on their ability to either activate or repress transcription. In Drosophila, there is only one "activator" E2F, dE2F1, which provides all of the pro-proliferative activity of E2F during development. Interestingly, the de2f1 gene can be transcribed from multiple promoters resulting in six alternate transcripts. In this study, we sought to investigate the biological significance of the alternate transcriptional start sites. We focused on the de2f1 promoter region where tissue and cell-type specific enhancer activities were observed at the larval stage. While a genomic deletion of this region, de2f1(ΔRA), decreased the overall expression level of dE2F1, flies developed normally with no obvious proliferation defects. However, a detailed analysis of the de2f1(ΔRA) mutant eye imaginal discs revealed that dE2F1 is needed for proper cell cycle exit. We discovered that dE2F1 expression during G1 arrest prior to the differentiation process of the developing eye is important for maintaining cell cycle arrest at a later stage of the eye development. Overall, our study suggests that specific alternate transcripts of "activator" E2F, dE2F1, may have a dual function on cell cycle progression and cannot simply be viewed as a pro-proliferative transcription factor.

  13. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  14. Circadian factors BMAL1 and RORα control HIF-1α transcriptional activity in nucleus pulposus cells: implications in maintenance of intervertebral disc health

    PubMed Central

    Suyama, Kaori; Silagi, Elizabeth S.; Choi, Hyowon; Sakabe, Kou; Mochida, Joji; Shapiro, Irving M.; Risbud, Makarand V.

    2016-01-01

    BMAL1 and RORα are major regulators of the circadian molecular oscillator. Since previous work in other cell types has shown cross talk between circadian rhythm genes and hypoxic signaling, we investigated the role of BMAL1 and RORα in controlling HIF-1-dependent transcriptional responses in NP cells that exist in the physiologically hypoxic intervertebral disc. HIF-1-dependent HRE reporter activity was further promoted by co-transfection with either BMAL1 or RORα. In addition, stable silencing of BMAL1 or inhibition of RORα activity resulted in decreased HRE activation. Inhibition of RORα also modulated HIF1α-TAD activity. Interestingly, immunoprecipitation studies showed no evidence of BMAL1, CLOCK or RORα binding to HIF-1α in NP cells. Noteworthy, stable silencing of BMAL1 as well as inhibition of RORα decreased expression of select HIF-1 target genes including VEGF, PFKFB3 and Eno1. To delineate if BMAL1 plays a role in maintenance of disc health, we studied the spinal phenotype of BMAL1-null mice. The lumbar discs of null mice evidenced decreased height, and several parameters associated with vertebral trabecular bone quality were also affected in nulls. In addition, null animals showed a higher ratio of cells to matrix in NP tissue and hyperplasia of the annulus fibrosus. Taken together, our results indicate that BMAL1 and RORα form a regulatory loop in the NP and control HIF-1 activity without direct interaction. Importantly, activities of these circadian rhythm molecules may play a role in the adaptation of NP cells to their unique niche. PMID:27049729

  15. UST -- Cathodic protection testing (maintenance and monitoring)

    SciTech Connect

    Maloney, T.A.

    1995-12-31

    Without proper maintenance, every tank system will eventually deteriorate. However, technology exists to extend structural life indefinitely if applied and maintained correctly. The keys to effective corrosion control of USTs are quality design and installation of equipment, use of proper technologies, and ongoing maintenance and monitoring. When a UST owner evaluates risk, corrosion control must be an integral part of their evaluation. The federal government recognizes the importance of ongoing corrosion control for underground storage tanks. Federal regulations (40 CFR Part 280) require each tank to be properly designed and constructed, and any portion underground that routinely contains product must be protected from corrosion, and to monitor the corrosion control to ensure continued protection. The regulations also require that the design, installation, and testing of cathodic protection systems be carried out by a person qualified by experience and training in corrosion control methods. Civil and criminal penalties can be imposed for noncompliance with the regulations. This paper provides background on maintenance of installed corrosion protection systems, testing requirements, and monitoring options available to owners of underground storage tanks.

  16. Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect

    King, David A.

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance and Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for

  17. Crew interface specifications development for inflight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Carl, J. G.

    1974-01-01

    Findings and data products developed during crew specification study for inflight maintenance and stowage functions are reported. From this information base, a family of data concepts to support crew inflight troubleshooting and corrective maintenance activities was developed and specified. Recommendations are made for the improvement of inflight maintenance planning, preparations and operations in future space flight programs through the establishment of an inflight maintenance organization and specific suggestions for techniques to improve the management of the inflight maintenance function.

  18. Design and synthesis of downsized metastin (45-54) analogs with maintenance of high GPR54 agonistic activity.

    PubMed

    Niida, Ayumu; Wang, Zixuan; Tomita, Kenji; Oishi, Shinya; Tamamura, Hirokazu; Otaka, Akira; Navenot, Jean-Marc; Broach, James R; Peiper, Stephen C; Fujii, Nobutaka

    2006-01-01

    Metastin has been identified as a metastasis suppressor gene product that mediates its function through a G protein coupled receptor, GPR54. To refine insight into the critical pharmacophore for the activation of GPR54, we have conducted alanine and d-amino acid scanning on a biologically active metastin fragment (45-54). Based on these data and structures of peptides previously reported to activate GPR54, a series of shortened metastin (45-54) derivatives were synthesized and tested for the ability to induce GPR54 signaling. These biological experiments were performed in yeast containing human GPR54 that was coupled to the pheromone response pathway and a pheromone responsive lacZ reporter gene. Compounds 32, 33, and 39, which possess an N-terminal basic group and a C-terminal RW-amide motif, were strong agonists, similar to the level of metastin. This may provide an approach to reverse the pro-metastatic effect of metastin deletion in multiple malignant tumors.

  19. Dopamine transporter is essential for the maintenance of spontaneous activity of auditory nerve neurones and their responsiveness to sound stimulation.

    PubMed

    Ruel, Jérôme; Wang, Jing; Demêmes, Danielle; Gobaille, Serge; Puel, Jean-Luc; Rebillard, Guy

    2006-04-01

    Dopamine, a neurotransmitter released by the lateral olivocochlear efferents, has been shown tonically to inhibit the spontaneous and sound-evoked activity of auditory nerve fibres. This permanent inhibition probably requires the presence of an efficient transporter to remove dopamine from the synaptic cleft. Here, we report that the dopamine transporter is located in the lateral efferent fibres both below the inner hair cells and in the inner spiral bundle. Perilymphatic perfusion of the dopamine transporter inhibitors nomifensine and N-[1-(2-benzo[b]thiophenyl)cyclohexyl]piperidine into the cochlea reduced the spontaneous neural noise and the sound-evoked compound action potential of the auditory nerve in a dose-dependent manner, leading to both neural responses being completely abolished. We observed no significant change in cochlear responses generated by sensory hair cells (cochlear microphonic, summating potential, distortion products otoacoustic emissions) or in the endocochlear potential reflecting the functional state of the stria vascularis. This is consistent with a selective action of dopamine transporter inhibitors on auditory nerve activity. Capillary electrophoresis with laser-induced fluorescence (EC-LIF) measurements showed that nomifensine-induced inhibition of auditory nerve responses was due to increased extracellular dopamine levels in the cochlea. Altogether, these results show that the dopamine transporter is essential for maintaining the spontaneous activity of auditory nerve neurones and their responsiveness to sound stimulation.

  20. Remote maintenance lessons learned'' on prototypical reprocessing equipment

    SciTech Connect

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab.

  1. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    NASA Astrophysics Data System (ADS)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  2. Microform Reader Maintenance.

    ERIC Educational Resources Information Center

    Hall, Hal W.; Michaels, George H.

    1985-01-01

    Describes experiences in organizing a program of microform reader and reader/printer maintenance at Texas A & M's Sterling C. Evans Library and offers guidelines for regular machine maintenance and repair. Guidelines discussed relate to maintenance philosophy, general machine cleaning, troubleshooting, service contracts, supplies,…

  3. Asphalt in Pavement Maintenance.

    ERIC Educational Resources Information Center

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  4. Light Vehicle Preventive Maintenance.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This correspondence course, originally developed for the Marine Corps, is designed to instruct students in the performance of preventive maintenance on motor vehicles. Instructional materials are presented in three chapters as follows: (1) Major Maintenance Areas (maintenance system, tires, batteries, cooling systems, and vehicle lubrication; (2)…

  5. Defer Maintenance, Invite Disaster

    ERIC Educational Resources Information Center

    Bowman, William W.

    1977-01-01

    An AGB- and NACUBO-sponsored survey showed that "wish lists" are accumulating overdue major maintenance projects because energy costs are consuming physical plant budgets. Problem areas are discussed: budget "guesstimation," preventive maintenance, deferred maintenance inventory, the APPA accounting format, resource allocation,…

  6. Maintenance Management System

    DTIC Science & Technology

    1990-06-01

    maintenance opera- tions. d. Available national maintenance management system (MMS) software be utilized to develop the planning, organizing...portland cement concrete pavements to level and realign faulted areas between slabs or craks within the slab by grinding the high side. MAINTENANCE ITEM

  7. Building Maintenance. Student Learning Guide.

    ERIC Educational Resources Information Center

    Palm Beach County Board of Public Instruction, West Palm Beach, FL.

    This student learning guide contains one module for completing a course in building maintenance. It is designed especially for use in secondary schools in Palm Beach County, Florida. The module covers one task, and consists of a purpose, performance objective, enabling objectives, learning activities keyed to resources, information sheets, student…

  8. Towards automated traceability maintenance.

    PubMed

    Mäder, Patrick; Gotel, Orlena

    2012-10-01

    Traceability relations support stakeholders in understanding the dependencies between artifacts created during the development of a software system and thus enable many development-related tasks. To ensure that the anticipated benefits of these tasks can be realized, it is necessary to have an up-to-date set of traceability relations between the established artifacts. This goal requires the creation of traceability relations during the initial development process. Furthermore, the goal also requires the maintenance of traceability relations over time as the software system evolves in order to prevent their decay. In this paper, an approach is discussed that supports the (semi-) automated update of traceability relations between requirements, analysis and design models of software systems expressed in the UML. This is made possible by analyzing change events that have been captured while working within a third-party UML modeling tool. Within the captured flow of events, development activities comprised of several events are recognized. These are matched with predefined rules that direct the update of impacted traceability relations. The overall approach is supported by a prototype tool and empirical results on the effectiveness of tool-supported traceability maintenance are provided.

  9. VNIIEF NMPC and A Maintenance Management Conference -- video surveillance

    SciTech Connect

    Malone, T.

    1997-08-01

    This paper is part of ongoing Nuclear Materials Protection, Control and Accountability (NMPC and A) work with the All Russian Scientific Research Institute of Experimental Physics (VNIIEF), Sarov, Russia. The material presented in the paper is to provide guidance for the preparation of maintenance management for NMPC and A video assessment and surveillance subsystems being installed at VNIIEF. This paper discusses maintenance philosophies, performance testing, equipment inspection/setup, and record keeping for a video assessment and surveillance subsystem.

  10. The Development and Maintenance of Paclitaxel-induced Neuropathic Pain Require Activation of the Sphingosine 1-Phosphate Receptor Subtype 1*

    PubMed Central

    Janes, Kali; Little, Joshua W.; Li, Chao; Bryant, Leesa; Chen, Collin; Chen, Zhoumou; Kamocki, Krzysztof; Doyle, Timothy; Snider, Ashley; Esposito, Emanuela; Cuzzocrea, Salvatore; Bieberich, Erhard; Obeid, Lina; Petrache, Irina; Nicol, Grant; Neumann, William L.; Salvemini, Daniela

    2014-01-01

    The ceramide-sphingosine 1-phosphate (S1P) rheostat is important in regulating cell fate. Several chemotherapeutic agents, including paclitaxel (Taxol), involve pro-apoptotic ceramide in their anticancer effects. The ceramide-to-S1P pathway is also implicated in the development of pain, raising the intriguing possibility that these sphingolipids may contribute to chemotherapy-induced painful peripheral neuropathy, which can be a critical dose-limiting side effect of many widely used chemotherapeutic agents. We demonstrate that the development of paclitaxel-induced neuropathic pain was associated with ceramide and S1P formation in the spinal dorsal horn that corresponded with the engagement of S1P receptor subtype 1 (S1PR1)-dependent neuroinflammatory processes as follows: activation of redox-sensitive transcription factors (NFκB) and MAPKs (ERK and p38) as well as enhanced formation of pro-inflammatory and neuroexcitatory cytokines (TNF-α and IL-1β). Intrathecal delivery of the S1PR1 antagonist W146 reduced these neuroinflammatory processes but increased IL-10 and IL-4, potent anti-inflammatory/neuroprotective cytokines. Additionally, spinal W146 reversed established neuropathic pain. Noteworthy, systemic administration of the S1PR1 modulator FTY720 (Food and Drug Administration-approved for multiple sclerosis) attenuated the activation of these neuroinflammatory processes and abrogated neuropathic pain without altering anticancer properties of paclitaxel and with beneficial effects extended to oxaliplatin. Similar effects were observed with other structurally and chemically unrelated S1PR1 modulators (ponesimod and CYM-5442) and S1PR1 antagonists (NIBR-14/15) but not S1PR1 agonists (SEW2871). Our findings identify for the first time the S1P/S1PR1 axis as a promising molecular and therapeutic target in chemotherapy-induced painful peripheral neuropathy, establish a mechanistic insight into the biomolecular signaling pathways, and provide the rationale for the

  11. Four-Year Maintenance Treatment With Adalimumab in Patients with Moderately to Severely Active Ulcerative Colitis: Data from ULTRA 1, 2, and 3

    PubMed Central

    Colombel, Jean-Frederic; Sandborn, William J; Ghosh, Subrata; Wolf, Douglas C; Panaccione, Remo; Feagan, Brian; Reinisch, Walter; Robinson, Anne M; Lazar, Andreas; Kron, Martina; Huang, Bidan; Skup, Martha; Thakkar, Roopal B

    2014-01-01

    OBJECTIVES: The safety and efficacy of adalimumab for patients with moderately to severely active ulcerative colitis (UC) has been reported up to week 52 from the placebo-controlled trials ULTRA (Ulcerative Colitis Long-Term Remission and Maintenance with Adalimumab) 1 and 2. Up to 4 years of data for adalimumab-treated patients from ULTRA 1, 2, and the open-label extension ULTRA 3 are presented. METHODS: Remission per partial Mayo score, remission per Inflammatory Bowel Disease Questionnaire (IBDQ) score, and mucosal healing rates were assessed in adalimumab-randomized patients from ULTRA 1 and 2 up to week 208. Corticosteroid-free remission was assessed in adalimumab-randomized patients who used corticosteroids at lead-in study baseline. Maintenance of remission per partial Mayo score and mucosal healing was assessed in patients who entered ULTRA 3 in remission per full Mayo score and with mucosal healing, respectively. As observed, last observation carried forward (LOCF) and nonresponder imputation (NRI) were used to report efficacy. Adverse events were reported for any adalimumab-treated patient. RESULTS: A total of 600/1,094 patients enrolled in ULTRA 1 or 2 were randomized to receive adalimumab and included in the intent-to-treat analyses of the studies. Of these, 199 patients remained on adalimumab after 4 years of follow-up. Rates of remission per partial Mayo score, remission per IBDQ score, mucosal healing, and corticosteroid discontinuation at week 208 were 24.7%, 26.3%, 27.7% (NRI), and 59.2% (observed), respectively. Of the patients who were followed up in ULTRA 3 (588/1,094), a total of 360 patients remained on adalimumab 3 years later. Remission per partial Mayo score and mucosal healing after ULTRA 1 or 2 to year 3 of ULTRA 3 were maintained by 63.6% and 59.9% of patients, respectively (NRI). Adverse event rates were stable over time. CONCLUSIONS: Remission, mucosal healing, and improved quality of life were maintained in patients with moderately to

  12. A computerized hospital maintenance system.

    PubMed

    Kresch, E; Katz, P; Schwartz, H; Hamarman, H

    1985-01-01

    The Biomedical Instrumentation Department at Thomas Jefferson University Hospital maintains most of the clinical equipment owned by the hospital and provides support to six other hospitals, as well. In order to document these services, a computerized support system has been developed. This system maintains the inventory of equipment, documents the occurrence of repair and preventive maintenance procedures, generates lists of items due for maintenance and inspection, and prints reports and summaries of all activities performed by department staff. The system was designed for ease of use and requires a minimum of training for personnel who use it.

  13. Active heroin injectors' perceptions and use of methadone maintenance treatment: cynical performance or self-prescribed risk reduction?

    PubMed

    Koester, S; Anderson, K; Hoffer, L

    1999-12-01

    In addition to the numerous heroin users who voluntarily enter methadone treatment as a way to free themselves from illicit drug addiction and those ordered to do so by the courts, there are a large number of opioid users who enter methadone treatment with other objectives in mind. These include shorter-term goals that users do not necessarily equate with complete heroin abstinence. In this paper we report the results of a qualitative study designed to identify and describe the motivations active heroin users have for entering methadone treatment, and to suggest that many of these short-term methadone episodes may operate as self-prescribed attempts at risk reduction, and act as pilot tests for users considering or anticipating entering treatment to quit the use of illicit drugs. We argue that heroin users' motivations, perceptions about methadone, and the strategies they devise for adapting methadone treatment for their own needs should be recognized for their value in reducing the multiple risks associated with drug use.

  14. School Facilities Maintenance and Operations Manual.

    ERIC Educational Resources Information Center

    Association of School Business Officials International, Reston, VA.

    Often a community's largest single investment is in its physical plants, including public school buildings and grounds. An essential factor in efficient school district operation is a well-organized, responsive plant operations and maintenance division. Maintenance has generally been defined as those services, activities, and procedures concerned…

  15. Standardized Curriculum for General Industrial Maintenance Trades.

    ERIC Educational Resources Information Center

    Mississippi State Dept. of Education, Jackson. Office of Vocational, Technical and Adult Education.

    Standardized vocational education course titles and core contents for two courses in Mississippi are provided: general industrial maintenance trades I and II. The first course contains the following units: (1) orientation and leadership activities; (2) safety; (3) blueprint reading; (4) oxyacetylene cutting; (5) preventative maintenance; (6)…

  16. Distinct Patterns of Tryptophan Maintenance in Tissues during Kynurenine Pathway Activation in Simian Immunodeficiency Virus-Infected Macaques

    PubMed Central

    Drewes, Julia L.; Croteau, Joshua D.; Shirk, Erin N.; Engle, Elizabeth L.; Zink, M. C.; Graham, David R.

    2016-01-01

    Induction of the kynurenine pathway (KP) of tryptophan (TRP) catabolism has been proposed to contribute to T cell dysfunction during human/simian immunodeficiency virus (SIV) infection via depletion of local TRP levels and production of immunomodulatory KP metabolites. However, while changes in TRP and KP metabolites have been observed in plasma, their levels in lymphoid tissues and levels of enzymes downstream of indoleamine 2,3-dioxygenase (IDO1) have been relatively unexplored. We used our SIV-infected pigtailed macaque model to analyze longitudinal changes in KP metabolites and enzymes by gas chromatography/mass spectrometry and NanoString nCounter gene expression analysis, respectively, in spleen and blood compared to changes previously established in brain and CSF. We found that TRP levels were remarkably stable in tissue sites despite robust depletion in the circulating plasma and CSF. We also demonstrated that intracellular TRP reserves were maintained in cultured cells even in the presence of depleted extracellular TRP levels. Kynurenine (KYN), 3-hydroxykynurenine, quinolinic acid, and the KP enzymes all displayed highly divergent patterns in the sites examined, though IDO1 expression always correlated with local KYN/TRP ratios. Finally, we demonstrated by fluorescence-activated cell sorting that myeloid dendritic cells and cells of monocytic lineage were the highest producers of IDO1 in chronically infected spleens. Overall, our study reveals insights into the tissue-specific regulation of KP enzymes and metabolites and, in particular, highlights the multiple mechanisms by which cells and tissues seek to prevent TRP starvation during inflammation. PMID:28066416

  17. Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment

    SciTech Connect

    Hill, D; Scarola, K

    2004-10-30

    This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

  18. Reliability centered maintenance in astronomical infrastructure facilities

    NASA Astrophysics Data System (ADS)

    Ansorge, W. R.

    2006-06-01

    Hundreds of mirror segment, thousands of high precision actuators, highly complex mechanical, hydraulic, electrical and other technology subsystems, and highly sophisticated control systems: an ELT system consists of millions of individual parts and components, each of them may fail and lead to a partial or complete system breakdown. The traditional maintenance concepts characterized by predefined preventive maintenance activities and rigid schedules are not suitable for handling this large number of potential failures and malfunctions and the extreme maintenance workload. New maintenance strategies have to be found suitable to increase reliability while reducing the cost of needless maintenance services. The Reliability Centred Maintenance (RCM) methodology is already used extensively by airlines, and in industrial and marine facilities and even by scientific institutions like NASA. Its application increases the operational reliability while reducing the cost of unnecessary maintenance activities and is certainly also a solution for current and future ELT facilities. RCM is a concept of developing a maintenance scheme based on the reliability of the various components of a system by using "feedback loops between instrument / system performance monitoring and preventive/corrective maintenance cycles." Ideally RCM has to be designed within a system and should be located in the requirement definition, the preliminary and final design phases of new equipment and complicated systems. However, under certain conditions, an implementation of RCM into the maintenance management strategy of already existing astronomical infrastructure facilities is also possible. This presentation outlines the principles of the RCM methodology, explains the advantages, and highlights necessary changes in the observatory development, operation and maintenance philosophies. Presently, it is the right time to implement RCM into current and future ELT projects and to save up to 50% maintenance

  19. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  20. Programming of formalin-induced nociception by neonatal LPS exposure: Maintenance by peripheral and central neuroimmune activity.

    PubMed

    Zouikr, Ihssane; Ahmed, Abdulrzag F; Horvat, Jay C; Beagley, Kenneth W; Clifton, Vicki L; Ray, Allyson; Thorne, Rick F; Jarnicki, Andrew G; Hansbro, Philip M; Hodgson, Deborah M

    2015-02-01

    The immune and nociceptive systems are shaped during the neonatal period where they undergo fine-tuning and maturation. Painful experiences during this sensitive period of development are known to produce long-lasting effects on the immune and nociceptive responses. It is less clear, however, whether inflammatory pain responses are primed by neonatal exposure to mild immunological stimuli, such as with lipopolysaccharide (LPS). Here, we examine the impact of neonatal LPS exposure on inflammatory pain responses, peripheral and hippocampal interleukin-1β (IL-1β), as well as mast cell number and degranulation in preadolescent and adult rats. Wistar rats were injected with LPS (0.05mg/kg IP, Salmonella enteritidis) or saline on postnatal days (PNDs) 3 and 5 and later subjected to the formalin test at PNDs 22 and 80-97. At both time-points, and one-hour after formalin injection, blood and hippocampus were collected for measuring circulating and central IL-1β levels using ELISA and Western blot, respectively. Paw tissue was also isolated to assess mast cell number and degree of degranulation using Toluidine Blue staining. Behavioural analyses indicate that at PND 22, LPS-challenged rats displayed enhanced flinching (p<.01) and licking (p<.01) in response to formalin injection. At PNDs 80-97, LPS-challenged rats exhibited increased flinching (p<.05), an effect observed in males only. Furthermore, neonatal LPS exposure enhanced circulating IL-1β and mast cell degranulation in preadolescent but not adult rats following formalin injection. Hippocampal IL-1β levels were increased in LPS-treated adult but not preadolescent rats in response to formalin injection. These data suggest neonatal LPS exposure produces developmentally regulated changes in formalin-induced behavioural responses, peripheral and central IL-1β levels, as well as mast cell degranulation following noxious stimulation later in life. These findings highlight the importance of immune activation during

  1. 40 CFR 86.1834-01 - Allowable maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance is due. A signal bearing the message “maintenance needed” or “check engine,” or a similar message.../or vehicle/engine malfunction (e.g., misfiring, stalling, black smoke), or an activation of...

  2. Operations and maintenance manual for the water/oil separator (F-2014)

    SciTech Connect

    Nielsen, R.M.

    1996-01-11

    This Document Provides Operating, Maintenance and Spare Part Information for the Ultra Aqua UFA-6 Water/Oil Separator Installed at MASF. (The plant has been designed for processing of condensates from air compressors.)

  3. Fascin Is Critical for the Maintenance of Breast Cancer Stem Cell Pool Predominantly via the Activation of the Notch Self-Renewal Pathway.

    PubMed

    Barnawi, Rayanah; Al-Khaldi, Samiyah; Majed Sleiman, Ghida; Sarkar, Abdullah; Al-Dhfyan, Abdullah; Al-Mohanna, Falah; Ghebeh, Hazem; Al-Alwan, Monther

    2016-12-01

    An emerging dogma shows that tumors are initiated and maintained by a subpopulation of cancer cells that hijack some stem cell features and thus referred to as "cancer stem cells" (CSCs). The exact mechanism that regulates the maintenance of CSC pool remains largely unknown. Fascin is an actin-bundling protein that we have previously demonstrated to be a major regulator of breast cancer chemoresistance and metastasis, two cardinal features of CSCs. Here, we manipulated fascin expression in breast cancer cell lines and used several in vitro and in vivo approaches to examine the relationship between fascin expression and breast CSCs. Fascin knockdown significantly reduced stem cell-like phenotype (CD44(hi) /CD24(lo) and ALDH(+) ) and reversal of epithelial to mesenchymal transition. Interestingly, expression of the embryonic stem cell transcriptional factors (Oct4, Nanog, Sox2, and Klf4) was significantly reduced when fascin expression was down-regulated. Functionally, fascin-knockdown cells were less competent in forming colonies and tumorspheres, consistent with lower basal self-renewal activity and higher susceptibility to chemotherapy. Fascin effect on CSC chemoresistance and self-renewability was associated with Notch signaling. Activation of Notch induced the relevant downstream targets predominantly in the fascin-positive cells. Limiting-dilution xenotransplantation assay showed higher frequency of tumor-initiating cells in the fascin-positive group. Collectively, our data demonstrated fascin as a critical regulator of breast CSC pool at least partially via activation of the Notch self-renewal signaling pathway and modification of the expression embryonic transcriptional factors. Targeting fascin may halt CSCs and thus presents a novel therapeutic approach for effective treatment of breast cancer. Stem Cells 2016;34:2799-2813 Video Highlight: https://youtu.be/GxS4fJ_Ow-o.

  4. Achieving Efficiencies in Army Installations.

    DTIC Science & Technology

    2007-11-02

    34" ’■■"■" 1 USAWC STRATEGY RESEARCH PROJECT Achieving Efficiencies in Army Installations by Richard Fliss Col. Richard M. Meinhart Project...government agency. STRATEGY RESEARCH PROJECT ACHIEVING EFFICIENCIES IN ARMY INSTALLATIONS BY RICHARD FLISS DISTRIBUTION STATEMENT A: Approved...for public release. Distribution is unlimited. DTIC QUALITY INSPECTED & USAWC CLASS OF 1998 U.S. ARMY WAR COLLEGE, CARLISLE BARRACKS, PA 17013-5050

  5. Neutrino experiments at LSD and ASD installations.

    NASA Astrophysics Data System (ADS)

    Dadykin, V. L.; Khalchukov, F. F.; Korchagin, V. B.; Korchagin, P. V.; Korolkova, E. V.; Malgin, A. S.; Mal'Gin, A. S.; Ryassny, V. G.; Ryasnyj, V. G.; Ryazhskaya, O. G.; Talochkin, V. P.; Yakushev, V. F.; Zatsepin, G. T.; Aglietta, M.; Badino, G.; Bologna, G. F.; Castagnoli, C.; Castellina, A.; Fulgione, W.; Galeotti, P.; Saavedra, O.; Trinchero, G. C.; Vallania, P.; Vernetto, S.

    No candidate for an antineutrino burst from collapsing stars has been observed during more than 4 years of ASD (Artymovsk Scintillation Detector) and 250 days of LSD (Large Scintillation Detector, Mont Blanc) lifetime. The data collected by the LSD installation are used to obtain an upper limit on the flux of atmospheric neutrinos, and to examine the possibility of detecting solar neutrinos and the correlation between their flux and solar activity.

  6. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  7. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    SciTech Connect

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly total than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.

  8. Synergistic Effect of Sodium Chlorite and Edible Coating on Quality Maintenance of Minimally Processed Citrus grandis under Passive and Active MAP.

    PubMed

    Ban, Zhaojun; Feng, Jianhua; Wei, Wenwen; Yang, Xiangzheng; Li, Jilan; Guan, Junfeng; Li, Jiang

    2015-08-01

    Edible coating has been an innovation within the bioactive packaging concept. The comparative analysis upon the effect of edible coating, sodium chlorite (SC) and their combined application on quality maintenance of minimally processed pomelo (Citrus grandis) fruits during storage at 4 °C was conducted. Results showed that the combination of edible coating and SC dipping delayed the microbial development whereas the sole coating or dipping treatment was less efficient. The synergetic application of edible coating and SC treatment under modified atmosphere packaging (MAP, 10% O2 , 10% CO2 ) was able to maintain the total soluble solids level and ascorbic acid content, while reduce the weight loss as well as development of mesophiles and psychrotrophs. Nonetheless, the N, O-carboxymethyl chitosan solely coated samples showed significantly higher level of weight loss during storage with comparison to the untreated sample. Furthermore, the combined application of edible coating and SC dipping under active MAP best maintained the sensory quality of minimally processed pomelo fruit during storage.

  9. Dynamics of mitochondrial DNA nucleoids regulated by mitochondrial fission is essential for maintenance of homogeneously active mitochondria during neonatal heart development.

    PubMed

    Ishihara, Takaya; Ban-Ishihara, Reiko; Maeda, Maki; Matsunaga, Yui; Ichimura, Ayaka; Kyogoku, Sachiko; Aoki, Hiroki; Katada, Shun; Nakada, Kazuto; Nomura, Masatoshi; Mizushima, Noboru; Mihara, Katsuyoshi; Ishihara, Naotada

    2015-01-01

    Mitochondria are dynamic organelles, and their fusion and fission regulate cellular signaling, development, and mitochondrial homeostasis, including mitochondrial DNA (mtDNA) distribution. Cardiac myocytes have a specialized cytoplasmic structure where large mitochondria are aligned into tightly packed myofibril bundles; however, recent studies have revealed that mitochondrial dynamics also plays an important role in the formation and maintenance of cardiomyocytes. Here, we precisely analyzed the role of mitochondrial fission in vivo. The mitochondrial fission GTPase, Drp1, is highly expressed in the developing neonatal heart, and muscle-specific Drp1 knockout (Drp1-KO) mice showed neonatal lethality due to dilated cardiomyopathy. The Drp1 ablation in heart and primary cultured cardiomyocytes resulted in severe mtDNA nucleoid clustering and led to mosaic deficiency of mitochondrial respiration. The functional and structural alteration of mitochondria also led to immature myofibril assembly and defective cardiomyocyte hypertrophy. Thus, the dynamics of mtDNA nucleoids regulated by mitochondrial fission is required for neonatal cardiomyocyte development by promoting homogeneous distribution of active mitochondria throughout the cardiomyocytes.

  10. Tumor suppressor protein DAB2IP participates in chromosomal stability maintenance through activating spindle assembly checkpoint and stabilizing kinetochore-microtubule attachments

    PubMed Central

    Yu, Lan; Shang, Zeng-Fu; Abdisalaam, Salim; Lee, Kyung-Jong; Gupta, Arun; Hsieh, Jer-Tsong; Asaithamby, Aroumougame; Chen, Benjamin P.C.; Saha, Debabrata

    2016-01-01

    Defects in kinetochore-microtubule (KT-MT) attachment and the spindle assembly checkpoint (SAC) during cell division are strongly associated with chromosomal instability (CIN). CIN has been linked to carcinogenesis, metastasis, poor prognosis and resistance to cancer therapy. We previously reported that the DAB2IP is a tumor suppressor, and that loss of DAB2IP is often detected in advanced prostate cancer (PCa) and is indicative of poor prognosis. Here, we report that the loss of DAB2IP results in impaired KT-MT attachment, compromised SAC and aberrant chromosomal segregation. We discovered that DAB2IP directly interacts with Plk1 and its loss inhibits Plk1 kinase activity, thereby impairing Plk1-mediated BubR1 phosphorylation. Loss of DAB2IP decreases the localization of BubR1 at the kinetochore during mitosis progression. In addition, the reconstitution of DAB2IP enhances the sensitivity of PCa cells to microtubule stabilizing drugs (paclitaxel, docetaxel) and Plk1 inhibitor (BI2536). Our findings demonstrate a novel function of DAB2IP in the maintenance of KT-MT structure and SAC regulation during mitosis which is essential for chromosomal stability. PMID:27568005

  11. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  12. Physically active, low-income African American women: an exploration of activity maintenance in the context of sociodemographic factors associated with inactivity.

    PubMed

    Harley, Amy E; Rice, Jessica; Walker, Renee; Strath, Scott J; Quintiliani, Lisa M; Bennett, Gary G

    2014-01-01

    Increasing physical activity among low-income African American women is an important target for addressing racial and economic disparities in chronic conditions and related risk factors. While barriers to physical activity for women have been examined empirically, successful strategies for navigating those barriers among physically active, low-income women have not been thoroughly explored. Informed by grounded theory, we conducted in-depth individual interviews between 2007-2010 with 14 low-income African American women who were physically active at nationally recommended levels for one year or more. We analyzed the data using thematic analysis techniques. Key themes emerged in three main categories: motivation for maintaining active lifestyle, strategies for maintaining physical activity, and challenges to maintaining physical activity. Important motivations included getting or staying healthy, social connections, and gratification. Two planning strategies emerged: flexibility and freedom. Critical challenges included financial constraints, physical strain and history of sedentary relapse. The motivations, strategies and challenges reported by low-income African American women who successfully maintained an active lifestyle provided important information for developing effective health promotion strategies for their inactive and underactive counterparts. A qualitative, asset-based approach to physical activity research contributes rich data to bridge the gap between epidemiological knowledge and community health improvement.

  13. Installation Power Projection Platforms Role in Support of the Deployed Force: The Disappearing Boundary Between Sustaining Base Activities and the Warfighter

    DTIC Science & Technology

    2007-11-02

    the outload. The DOL coordinates with the Military Traffic Management Command ( MTMC ) for movement of equipment and personnel by commercial carrier...Officer (ITO), and MTMC . FM 100-22 5-6 During this phase, units take actions to speed transition to active duty status. In CONUS, units required to...personnel, its movement configurations, and its ultimate destination. These personnel work with MTMC representatives, supporting ITOs, or Theater

  14. Installation Restoration Program Environmental Technology Development. Task Order 3. Use of Activated Carbon for Treatment of Explosives-Contaminated Ground Water at the Badger Army Ammunition Plant (BAAP)

    DTIC Science & Technology

    1989-08-01

    PROGRAM ENVIRONMENTAL TECHNOLOGY DEVELOPMENT Task Order - 3 Use of Activated Carbon for Treatment of Explosives-Contaminated Groundwater at the...CARBON FOR TREATMENT OF EXPLOSIVES-CONTAMINATED GROUNDWATER AT THE BADGER ARMY AMMUNITION PLANT (BAAP) Final Report Distribution Unlimited August 1989... Treatment of Explosj~ves Contaminated Groundwater. 121 PERSONAL AUTHOR(S) Walter J. Wuicik: William L. Lowe; Peter 3. Marks- 13.. TYPE OF REPORT 113b

  15. Installation of new bottom in existing above ground storage tank

    SciTech Connect

    Stapleton, W.E.

    1995-12-31

    New bottom installation in existing aboveground storage tanks is a simple process when the correct procedures are followed in preparation for the bottom replacement. An in-depth inspection must be conducted to determine the exact modifications required during the installation of the new bottom, internal decisions made as to type of construction required, and a detailed scope of work prepared to insure all aspects of the tank bottom replacement are detailed. Determining the scope of work requires an in-depth tank inspection, making decisions on the type of bottom to be installed, tank modifications required, tank appurtenance modifications and relocation, whether leak detection, cathodic protection, and secondary containment are to be installed and a decision on whether the old tank bottom will remain in place or be removed. Upon completion of the new bottom installation, a final check to ensure all modifications were performed per API-650 and API-653 and all non-destructive testing procedures were conducted, will insure a safe, leak free bottom providing many years of maintenance free service.

  16. Intelligent devices simplify remote SCADA installations in substations

    SciTech Connect

    Kopriva, V.J.

    1994-12-31

    Utilities are increasingly relying on Supervisory Control and Data Acquisition (SCADA) Systems for the effective and economical management of electric transmission and distribution systems. Now, advances in equipment and design technologies have created opportunities for an increased level of monitoring and control at electric power substations. In the past, prohibitive factors, including complicated equipment and wiring retrofits, protocol compatibility, and hardware installation and maintenance costs have impeded electric utilities in their attempt at broad based application of SCADA systems in electric substations, particularly at distribution voltage levels. These advances in equipment technologies have provided utilities with the opportunity to install and operate SCADA systems at lower cost, while providing flexibility for system expansion over longer periods. The development of intelligent microprocessor controlled devices and integrated communications has facilitated the use of a distributed design approach to installing SCADA monitoring and control in substations. This approach offers greater hardware flexibility and reduced installation costs while increasing reliability, making the addition of monitoring and control to electric substations increasingly practical. This paper will examine current trends in the application of intelligent microprocessor controlled and electronic devices, in stand alone and distributed applications, and the simplification of techniques for installing SCADA systems in substations. It will also consider the potential advantages to be realized in cost and reliability, and examine the necessary changes in design and operation philosophies required to effectively implement the new technology.

  17. Innovation for maintenance technology improvements

    NASA Technical Reports Server (NTRS)

    Shives, T. R. (Editor); Willard, W. A. (Editor)

    1982-01-01

    A group of 34 submitted entries (32 papers and 2 abstracts) from the 33rd meeting of the Mechanical Failures Prevention Group whose subject was maintenance technology improvement through innovation. Areas of special emphasis included maintenance concepts, maintenance analysis systems, improved maintenance processes, innovative maintenance diagnostics and maintenance indicators, and technology improvements for power plant applications.

  18. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  19. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  20. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  1. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  2. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  3. Role of activating transcription factor 3 in the synthesis of latency-associated transcript and maintenance of herpes simplex virus 1 in latent state in ganglia

    PubMed Central

    Shu, Minfeng; Du, Te; Zhou, Grace; Roizman, Bernard

    2015-01-01

    A key property of herpes simplex viruses (HSVs) is their ability to establish latent infection in sensory or autonomic ganglia and to reactivate on physical, hormonal, or emotional stress. In latently infected ganglia, HSVs express a long noncoding RNA, a latency-associated transcript (LAT), which plays a key role in maintaining latently infected neurons, but not viral proteins. To investigate the events leading to reactivation, we examined the use of ganglionic organ cultures that enable rapid reactivation in medium containing antibody to nerve growth factor (NGF) or delayed reactivation in medium containing NGF and epidermal growth factor (EGF). Here we report the discovery that activating transcription factor 3 (ATF3), a stress response protein, profoundly affects the interaction of HSV with its host. Specifically, (i) ATF3 is induced by stress, such as inhibition of protein synthesis or infection; (ii) in infected cells, ATF3 enhances the accumulation of LAT by acting on the response elements in the promoter of the LAT precursor RNA; (iii) ATF3 is induced nearly 100-fold in ganglionic organ cultures; and (iv) ATF3 plays a key role in the maintenance of the latent state, inasmuch as expression of ATF3 bereft of the C-terminal activation domain acts as a dominant negative factor, inducing HSV gene expression in ganglionic organ cultures harboring latent virus and incubated in medium containing NGF and EGF. Thus, ATF3 is a component of a cluster of cellular proteins that together with LAT maintain the integrity of the neurons harboring latent virus. PMID:26305977

  4. Maintenance management at La Silla Paranal Observatory

    NASA Astrophysics Data System (ADS)

    Montano, Nelson

    2008-07-01

    From the beginning of the VLT project, the European Southern Observatory (ESO) considered the application of a competent maintenance strategy a fundamental aspect for future operations of the Paranal Observatory. For that purpose, a special maintenance philosophy was developed during the project stage and applied during the initial years of operations. The merging of the La Silla and Paranal Observatories in 2005 added a new managerial challenge to the regular operational requirements (high availability and reliability) which motivated ESO Management to develop a stronger strategy for the operations of the new merged Observatory. Part of the new strategy considered the creation of a dedicated department for the management of all maintenance activities, separating this support from the traditional scheme where the Engineering Department had the responsibility for the entire technical support to operations. In order to keep a competent level of maintenance operations for the new unified Observatory, the La Silla Paranal (LSP) Maintenance Department has been using a well known maintenance management model used in various industrial applications as a guide. Today the operations of the Maintenance Department are concentrated on developing and implementing practices regarding concepts such as Maintenance Tactics, Planning, Data Management, Performance Indicators and Material Management. In addition to that, advances related to Reliability Analysis been taken in order to reach a superior level of excellence. The results achieved by the LSP Maintenance Department are reflected in a reduced rate of functional failures, allowing uninterrupted operations of the Observation sites.

  5. Documenting the Effectiveness of Cosorption of Airborne Contaminants by a Field-Installed Active Desiccant System: Final Report - Phase 2D

    SciTech Connect

    Fischer, J

    2003-01-23

    The final report for Phase 1 of this research effort (ORNL/SUB/94-SV004/1) concluded that a significant market opportunity would exist for active desiccant systems if it could be demonstrated that they can remove a significant proportion of common airborne contaminants while simultaneously performing the primary function of dehumidifying a stream of outdoor air or recirculated building air. If the engineering community begins to follow the intent of ASHRAE Standard 62, now part of all major building codes, the outdoor air in many major cities may need to be pre-cleaned before it is introduced into occupied spaces. Common air contaminant cosorption capability would provide a solution to three important aspects of the ASHRAE 62-89 standard that have yet to be effectively addressed by heating, ventilation, and air-conditioning (HVAC) equipment manufacturers: (1) The ASHRAE standard defines acceptable outdoor air quality. If the outdoor air contains unacceptable levels of certain common outdoor air contaminants (e.g., sulfur dioxide, ozone), then the standard requires that these contaminants be removed from the outdoor air stream to reach compliance with the acceptable outdoor air quality guidelines. (2) Some engineers prefer to apply a filtration or prescriptive approach rather than a ventilation approach to solving indoor air quality problems. The ASHRAE standard recognizes this approach provided that the filtration technology exists to remove the gaseous contaminants encountered. The performance of current gaseous filtration technologies is not well documented, and they can be costly to maintain because the life of the filter is limited and the cost is high. Moreover, it is not easy to determine when the filters need changing. In such applications, an additional advantage provided by the active desiccant system would be that the same piece of equipment could control space humidity and provide filtration, even during unoccupied periods, if the active desiccant system

  6. Maintenance and Logistics Support for the International Monitoring System Network of the CTBTO

    NASA Astrophysics Data System (ADS)

    Haslinger, F.; Brely, N.; Akrawy, M.

    2007-05-01

    The global network of the International Monitoring System (IMS) of the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO), once completed, will consist of 321 monitoring facilities of four different technologies: hydroacoustic, seismic, infrasonic, and radionuclide. As of today, about 65% of the installations are completed and contribute data to the products issued by the International Data Centre (IDC) of the CTBTO. In order to accomplish the task to reliably collect evidence for any potential nuclear test explosion anywhere on the planet, all stations are required to perform to very high data availability requirements (at least 98% data availability over a 12-month period). To enable reaching this requirement, a three-layer concept has been developed to allow efficient support of the IMS stations: Operations, Maintenance and Logistics, and Engineering. Within this concept Maintenance and Logistics provide second level support of the stations, whereby problems arising at the station are assigned through the IMS ticket system to Maintenance if they cannot be resolved on the Operations level. Maintenance will then activate the required resources to appropriately address and ultimately resolve the problem. These resources may be equipment support contracts, other third party contracts, or the dispatch of a maintenance team. Engineering Support will be activated if the problem requires redesign of the station or after catastrophic failures when a total rebuild of a station may be necessary. In this model, Logistics Support is responsible for parts replenishment and support contract management. Logistics Support also collects and analyzes relevant failure mode and effect information, develops supportability models, and has the responsibility for document management, obsolescence, risk & quality, and configuration management, which are key elements for efficient station support. Maintenance Support in addition is responsible for maintenance strategies, for

  7. [Medical Equipment Maintenance Methods].

    PubMed

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area.

  8. Examining Incentives to Promote Physical Activity Maintenance Among Hospital Employees Not Achieving 10,000 Daily Steps: A Web-Based Randomized Controlled Trial Protocol

    PubMed Central

    White, Lauren; Oh, Paul; Kwan, Matthew; Gove, Peter; Leahey, Tricia; Faulkner, Guy

    2016-01-01

    the winter of 2018. Conclusions This protocol was designed to examine the impact of guaranteed rewards on physical activity maintenance in lower active hospital employees. ClinicalTrial ClinicalTrials.gov NCT02638675; https://clinicaltrials.gov/ct2/show/NCT0 2638675 (Archived by WebCite at http://www.webcitation.org/6g4pvZvhW) PMID:27956377

  9. Cradle/pump heating system operation and maintenance manual

    SciTech Connect

    Taylor, S.L., Fluor Daniel Hanford

    1997-02-01

    This is the operation and maintenance manual for the 241-SY-101 Cradle/Pump Heating System. The Heating System provides the means to heat the pump (HMT {number_sign}2) during cold weather to assure safe and smooth pump installation.

  10. 32 CFR 174.14 - Maintenance and repair.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Maintenance and repair. (a) Facilities and equipment located on installations being closed are often important... and to protect the property for the time periods set forth in paragraph (c) of this section. Where... standards for excess and surplus properties as provided in the Federal Management Regulations of the GSA,...

  11. Carpentry and Finishing Procedures. Building Maintenance. Module II. Instructor's Guide.

    ERIC Educational Resources Information Center

    Hawk, Sam; Brunk, Art

    This curriculum guide, keyed to the building maintenance competency profile developed by industry and education professionals, provides three units on carpentry and finishing procedures. The first unit, Exterior Carpentry, contains the following lessons: carpentry safety procedures, ladder and scaffolding safety, door installation/repair,…

  12. Aviation Maintenance Technology. General. G104 Technical Mechanics. Instructor Material.

    ERIC Educational Resources Information Center

    Oklahoma State Board of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    These instructor materials for an aviation maintenance technology course contain five instructional modules. The modules cover the following topics: performing aircraft ground handling and servicing, using hand and power tools and precision measuring instruments, identifying and selecting aircraft hardware, fabricating and installing rigid and…

  13. 40 CFR 86.1725-99 - Maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with a maintenance indicator consisting of a light that shall activate automatically by illuminating... system consisting of a light that shall illuminate the first time the battery system is unable to...

  14. Long-term Outcomes of the FRESH START Trial: Exploring the Role of Self-efficacy in Cancer Survivors’ Maintenance of Dietary Practices and Physical Activity

    PubMed Central

    Mosher, Catherine E.; Lipkus, Isaac; Sloane, Richard; Snyder, Denise C.; Lobach, David F.; Demark-Wahnefried, Wendy

    2012-01-01

    Objective This study examined whether changes in self-efficacy explain the effects of a mailed print intervention on long-term dietary practices of breast and prostate cancer survivors. The relationship between change in self-efficacy and long-term physical activity (PA) also was examined. Methods Breast and prostate cancer survivors (N=543) from 39 U.S. states and two Canadian provinces participated in the FRESH START intervention trial. Participants were randomly assigned to receive a 10-month program of mailed print materials on diet and PA available in the public domain or a 10-month program of tailored materials designed to increase fruit and vegetable (F&V) intake, decrease fat intake, and/or increase PA. Changes in self-efficacy for F&V intake and fat restriction were analyzed as potential mediators of the intervention’s effects on diet at 2-year follow-up. Because we previously found that change in self-efficacy for PA did not vary by group assignment, the relationship between change in self-efficacy and PA at 2-year follow-up was examined across study conditions. Results Results suggest that change in self-efficacy for fat restriction partially explained the intervention’s effect on fat intake (mean indirect effect=-.28), and change in self-efficacy for F&V consumption partially explained the intervention’s effect on daily F&V intake (mean indirect effect=.11). Change in self-efficacy for fat restriction partially accounted for the intervention’s impact on overall diet quality among men only (mean indirect effect=.60). Finally, change in self-efficacy for PA predicted PA at 2-year follow-up. Conclusions Findings suggest that self-efficacy may influence long-term maintenance of healthy lifestyle practices among cancer survivors. PMID:22544562

  15. A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

  16. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  17. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  18. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  19. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Operation and maintenance. 654.15 Section 654.15..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.15 Operation and maintenance. Sponsor(s) are to operate and maintain completed project measures...

  20. 7 CFR 654.10 - Operation and maintenance agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Operation and maintenance agreement. 654.10 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.10 Operation and maintenance agreement. A duly authorized official of...

  1. 7 CFR 654.12 - Financing operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Financing operations and maintenance. 654.12 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.12 Financing operations and maintenance. Sources of funds needed...

  2. 7 CFR 654.31 - Performing operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Performing operation and maintenance. 654.31 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation Operations § 654.31 Performing operation and maintenance. The method of performing O&M is to be at the...

  3. Solar heating and cooling system installed at Columbus, Ohio. Final report

    SciTech Connect

    Coy, R. G.; Braden, R. P.

    1980-09-01

    The Solar Energy System installed at Columbus Technical Institute, Columbus, Ohio was installed as a part of a new construction of a college building. The building will house classrooms and laboratories, administrative offices and three lecture halls. The Solar Energy System consists of 4096 square feet (128 panels) Owens/Illinois Evacuated Glass Tube Collector Subsystem, and a 5000 gallon steel tank below ground storage system, hot water is circulated between the collectors and storage tank, passing through a water/lithium bromide absorption chiller to cool the building. Extracts from the site files specification references, drawings, installation, operation and maintenance instructions are included.

  4. Fixing Maintenance Productivity.

    ERIC Educational Resources Information Center

    Fickes, Michael

    2003-01-01

    Describes how one university's facility managers use Nextel communications technology in conjunction with a Famis Software maintenance management system to improve the productivity of its maintenance technicians. The system uses a wireless Internet connection to automate the flow of work order information to and from technicians. The key to these…

  5. Progressive Planned Maintenance.

    ERIC Educational Resources Information Center

    Lewis, Mary Jo; Jacobs, Richard S.

    A planned maintenance system, which was implemented at Washington State University (WSU), uniquely integrates functions of equipment inventory, scheduling, time reporting, project management, materials inventory, and billing. Management now has immediate access to equipment data, maintenance status, and costs. Staff requirements are readily…

  6. Maintenance of School Gymnasiums.

    ERIC Educational Resources Information Center

    Finchum, R. N.

    1965-01-01

    Procedures are suggested that may be helpful to those responsible for the operation and maintenance of school buildings and gymnasiums. Most schools with gymnasiums utilize them for both instructional and sports purposes. Maintenance of the multipurpose gym are discussed under four subject areas--(1) floors, (2) lighting, (3) sanitation, and (4)…

  7. Maintenance Trades Guidelines

    ERIC Educational Resources Information Center

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents…

  8. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    SciTech Connect

    Doyle, C.; Truitt, A.; Inda, D.; Lawrence, R.; Lockhart, R.; Golden, M.

    2015-03-01

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

  9. Mining Surveillance and Maintenance Dollars

    SciTech Connect

    MARTINEZ, R.

    2000-02-01

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

  10. Department of the Navy Justification of Estimates for Fiscal Year 1987 Submitted to Congress February 1986. Operation & Maintenance, Navy. Book 1. Budget Activity 1: Strategic Forces Budget Activity 2: General Purpose Forces Budget Activity 4: Airlift and Sealift

    DTIC Science & Technology

    1986-02-01

    support assigned missions. o Minar Construction - finances the erection, installation or assembly of real property facilities; the addition...14,134) c) Asbestos removal from carrier machinery boxes, main soaces, and auxiliary spaces and certification of berthing spaces as "asbe.-ns free

  11. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  12. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  13. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  14. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  15. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  16. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  17. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  18. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  19. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  20. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  1. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  2. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  3. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  4. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  5. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  6. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  7. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  8. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  9. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  10. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  11. A Methodology for Modeling Nuclear Power Plant Passive Component Aging in Probabilistic Risk Assessment under the Impact of Operating Conditions, Surveillance and Maintenance Activities

    NASA Astrophysics Data System (ADS)

    Guler Yigitoglu, Askin

    In the context of long operation of nuclear power plants (NPPs) (i.e., 60-80 years, and beyond), investigation of the aging of passive systems, structures and components (SSCs) is important to assess safety margins and to decide on reactor life extension as indicated within the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. In the traditional probabilistic risk assessment (PRA) methodology, evaluating the potential significance of aging of passive SSCs on plant risk is challenging. Although passive SSC failure rates can be added as initiating event frequencies or basic event failure rates in the traditional event-tree/fault-tree methodology, these failure rates are generally based on generic plant failure data which means that the true state of a specific plant is not reflected in a realistic manner on aging effects. Dynamic PRA methodologies have gained attention recently due to their capability to account for the plant state and thus address the difficulties in the traditional PRA modeling of aging effects of passive components using physics-based models (and also in the modeling of digital instrumentation and control systems). Physics-based models can capture the impact of complex aging processes (e.g., fatigue, stress corrosion cracking, flow-accelerated corrosion, etc.) on SSCs and can be utilized to estimate passive SSC failure rates using realistic NPP data from reactor simulation, as well as considering effects of surveillance and maintenance activities. The objectives of this dissertation are twofold: The development of a methodology for the incorporation of aging modeling of passive SSC into a reactor simulation environment to provide a framework for evaluation of their risk contribution in both the dynamic and traditional PRA; and the demonstration of the methodology through its application to pressurizer surge line pipe weld and steam generator tubes in commercial nuclear power plants. In the proposed methodology, a

  12. Aasgard subsea installation on schedule

    SciTech Connect

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  13. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  14. Temperature rise of installed FCC

    NASA Technical Reports Server (NTRS)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  15. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  16. Operation and maintenance of Fermilab`s satellite refrigerator expansion engines

    SciTech Connect

    Soyars, W.M.

    1996-09-01

    Fermilab`s superconducting Tevatron accelerator is cooled to liquid helium temperatures by 24 satellite refrigerators, each of which uses for normal operations a reciprocating `wet` expansion engine. These expanders are basically Process System (formerly Koch) Model 1400 expanders installed in standalone cryostats designed by Fermilab. This paper will summarize recent experience with operations and maintenance of these expansion engines. Some of the statistics presented will include total engine hours, mean time between major and minor maintenance, and frequent causes of major maintenance.

  17. Practical machinery management for process plants. Volume 3: Machinery component maintenance and repair

    SciTech Connect

    Bloch, H.P.; Geitner, F.K.

    1985-01-01

    This work is a reference for machinery engineers concerned with machinery and component installation, maintenance, and repair. This third volume covers maintenance organization, machinery turnaround management, turbomachinery overhauls, machinery foundations and grouting, process machinery piping, alignment and balancing of machinery components, ball bearing maintenance and replacement, mechanical seals, welded repairs to pump shafts and other rotating equipment components, centrifugal compressor rotor repair, selection and application of O-rings, and more.

  18. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  19. Maintenance for the Millennium: Another Approach

    SciTech Connect

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  20. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    SciTech Connect

    Tahvili, Sahar; Österberg, Jonas; Silvestrov, Sergei; Biteus, Jonas

    2014-12-10

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms of a suggested framework model based on discrete event simulation.