Sample records for activities involving schedule

  1. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Schedule 1 chemicals. 712.2 Section 712.2 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.2 Restrictions on activities involving...

  2. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Schedule 1 chemicals. 712.2 Section 712.2 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.2 Restrictions on activities involving...

  3. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Schedule 1 chemicals. 712.2 Section 712.2 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.2 Restrictions on activities involving...

  4. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to zero rule that applies to activities involving Schedule 1 chemicals. Facilities that produce, export or... activities involving Schedule 1 chemicals. 712.1 Section 712.1 Commerce and Foreign Trade Regulations...

  5. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... activities involving Schedule 1 chemicals. 712.1 Section 712.1 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to zero...

  6. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  7. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Round to zero rule that applies to... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to zero.... 1 to this part) as unavoidable by-products or impurities may round to zero and are not subject to...

  8. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Round to zero rule that applies to... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to zero.... 1 to this part) as unavoidable by-products or impurities may round to zero and are not subject to...

  9. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 2 2014-01-01 2014-01-01 false Round to zero rule that applies to... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to zero.... 1 to this part) as unavoidable by-products or impurities may round to zero and are not subject to...

  10. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  11. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Schedule 1 chemicals. (a) You may not produce Schedule 1 chemicals for protective purposes. (b) You may not... research, medical, pharmaceutical, or protective purposes; (3) The import is in types and quantities strictly limited to those that can be justified for such purposes; and (4) You have notified BIS at least...

  12. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Schedule 1 chemicals. (a) You may not produce Schedule 1 chemicals for protective purposes. (b) You may not... research, medical, pharmaceutical, or protective purposes; (3) The import is in types and quantities strictly limited to those that can be justified for such purposes; and (4) You have notified BIS at least...

  13. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  14. 76 FR 76935 - Impact of Implementing the Chemical Weapons Convention (CWC) on Commercial Activities Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security [Docket No. 111130706-1686-01] Impact of Implementing the Chemical Weapons Convention (CWC) on Commercial Activities Involving ``Schedule 1'' Chemicals Through Calendar Year 2011; Impact of Adding Salts of CWC ``Schedule 1'' Chemicals to ``Schedule 1...

  15. Automated Scheduling of Science Activities for Titan Encounters by Cassini

    NASA Technical Reports Server (NTRS)

    Ray, Trina L.; Knight, Russel L.; Mohr, Dave

    2014-01-01

    In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

  16. Comparing Book- and Tablet-Based Picture Activity Schedules: Acquisition and Preference.

    PubMed

    Giles, Aimee; Markham, Victoria

    2017-09-01

    Picture activity schedules consist of a sequence of images representing the order of tasks for a person to complete. Although, picture activity schedules have traditionally been presented in a book format, recently picture activity schedules have been evaluated on technological devices such as an iPod™ touch. The present study compared the efficiency of picture activity schedule acquisition on book- and tablet-based modalities. In addition, participant preference for each modality was assessed. Three boys aged below 5 years with a diagnosis of autism participated. Participants were taught to follow the schedules using both modalities. Following mastery of each modality of picture activity schedule, a concurrent-chains preference assessment was conducted to evaluate participant preference for each modality. Differences in acquisition rates across the two modalities were marginal. Preference for book- or tablet-based schedules was idiosyncratic across participants.

  17. 75 FR 69630 - Impact of Implementation of the Chemical Weapons Convention on Commercial Activities Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... Implementation of the Chemical Weapons Convention on Commercial Activities Involving ``Schedule 1'' Chemicals, Including Production of Schedule 1 Chemicals as Intermediates, Through Calendar Year 2010 AGENCY: Bureau of... (BIS) is seeking public comments on the impact that implementation of the Chemical Weapons Convention...

  18. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  19. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  20. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  1. Negotiating on location, timing, duration, and participant in agent-mediated joint activity-travel scheduling

    NASA Astrophysics Data System (ADS)

    Ma, Huiye; Ronald, Nicole; Arentze, Theo A.; Timmermans, Harry J. P.

    2013-10-01

    Agent-based simulation has become an important modeling approach in activity-travel analysis. Social activities account for a large amount of travel and have an important effect on activity-travel scheduling. Participants in joint activities usually have various options regarding location, participants, and timing and take different approaches to make their decisions. In this context, joint activity participation requires negotiation among agents involved, so that conflicts among the agents can be addressed. Existing mechanisms do not fully provide a solution when utility functions of agents are nonlinear and non-monotonic. Considering activity-travel scheduling in time and space as an application, we propose a novel negotiation approach, which takes into account these properties, such as continuous and discrete issues, and nonlinear and non-monotonic utility functions, by defining a concession strategy and a search mechanism. The results of experiments show that agents having these properties can negotiate efficiently. Furthermore, the negotiation procedure affects individuals’ choices of location, timing, duration, and participants.

  2. A space station onboard scheduling assistant

    NASA Technical Reports Server (NTRS)

    Brindle, A. F.; Anderson, B. H.

    1988-01-01

    One of the goals for the Space Station is to achieve greater autonomy, and have less reliance on ground commanding than previous space missions. This means that the crew will have to take an active role in scheduling and rescheduling their activities onboard, perhaps working from preliminary schedules generated on the ground. Scheduling is a time intensive task, whether performed manually or automatically, so the best approach to solving onboard scheduling problems may involve crew members working with an interactive software scheduling package. A project is described which investigates a system that uses knowledge based techniques for the rescheduling of experiments within the Materials Technology Laboratory of the Space Station. Particular attention is paid to: (1) methods for rapid response rescheduling to accommodate unplanned changes in resource availability, (2) the nature of the interface to the crew, (3) the representation of the many types of data within the knowledge base, and (4) the possibility of applying rule-based and constraint-based reasoning methods to onboard activity scheduling.

  3. Focus of attention in an activity-based scheduler

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman; Fox, Mark S.

    1989-01-01

    Earlier research in job shop scheduling has demonstrated the advantages of opportunistically combining order-based and resource-based scheduling techniques. An even more flexible approach is investigated where each activity is considered a decision point by itself. Heuristics to opportunistically select the next decision point on which to focus attention (i.e., variable ordering heuristics) and the next decision to be tried at this point (i.e., value ordering heuristics) are described that probabilistically account for both activity precedence and resource requirement interactions. Preliminary experimental results indicate that the variable ordering heuristic greatly increases search efficiency. While least constraining value ordering heuristics have been advocated in the literature, the experimental results suggest that other value ordering heuristics combined with our variable-ordering heuristic can produce much better schedules without significantly increasing search.

  4. 15 CFR 712.4 - New Schedule 1 production facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.4 New Schedule 1 production facility. (a) Establishment of a...) of the CWCR, and you intend to begin production of Schedule 1 chemicals at your facility in...

  5. 15 CFR 712.4 - New Schedule 1 production facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.4 New Schedule 1 production facility. (a) Establishment of a...) of the CWCR, and you intend to begin production of Schedule 1 chemicals at your facility in...

  6. Active Solution Space and Search on Job-shop Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Watanabe, Masato; Ida, Kenichi; Gen, Mitsuo

    In this paper we propose a new searching method of Genetic Algorithm for Job-shop scheduling problem (JSP). The coding method that represent job number in order to decide a priority to arrange a job to Gannt Chart (called the ordinal representation with a priority) in JSP, an active schedule is created by using left shift. We define an active solution at first. It is solution which can create an active schedule without using left shift, and set of its defined an active solution space. Next, we propose an algorithm named Genetic Algorithm with active solution space search (GA-asol) which can create an active solution while solution is evaluated, in order to search the active solution space effectively. We applied it for some benchmark problems to compare with other method. The experimental results show good performance.

  7. Scheduling Software for Complex Scenarios

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

  8. HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

    NASA Technical Reports Server (NTRS)

    Hua, Hook; Mrozinski, Joseph J.; Elfes, Alberto; Adumitroaie, Virgil; Shelton, Kacie E.; Smith, Jeffrey H.; Lincoln, William P.; Weisbin, Charles R.

    2012-01-01

    HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

  9. Activity Schedules, Computer Technology, and Teaching Children with Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Stromer, Robert; Kimball, Jonathan W.; Kinney, Elisabeth M.; Taylor, Bridget A.

    2006-01-01

    A review of selected literature suggests that integrating multimedia computer supports with activity schedules can be an effective way to teach students to manage their work, play, and skill-building activities independently. Activity schedules originally were a means of promoting independent execution of previously learned responses by using…

  10. Male involvement in reproductive health among scheduled tribe: experience from Khairwars of central India.

    PubMed

    Saha, Kalyan B; Singh, Neeru; Chatterjee Saha, Uma; Roy, Jyotirmoy

    2007-01-01

    Indian tribal men's lack of participation in reproductive health not only damages their own health, but also contributes to the reproductive ill health of their female partners and children. In India the involvement of men in such matters is a new concept. There is a paucity of data particularly on Scheduled tribesmen's knowledge and the extent of their participation in reproductive health. This inhibits planning. The present study aims to understand the involvement of Scheduled tribesmen in reproductive health and the barriers to their involvement by generating a database from the Khairwar tribe of Central India. A door-to-door survey on knowledge, attitude and practice relating to aspects of reproductive health was conducted by canvassing a pre-designed interview schedule among 15-40 year old, currently married Khairwar males in the Sidhi district of Madhya Pradesh, India. As far as reproductive morbidity is concerned, only 17% of the respondents had heard of HIV/AIDS, and most had no proper knowledge of its transmission. Although 74% of the respondents had heard about reproductive tract infections, the majority of them were unaware of the mechanism of transmission and seriousness of the problem. The duel role of condoms, both as a method of family planning and a protective measure against sexually transmitted infections, was also unknown to them. Approximately 59% of the males were aware of family planning but only 13% were using any method (mostly female sterilization) at the time of survey. Their view on the ideal number of children (3.56) exceeded the actual number of children born and living. High infant and child mortality influenced their preference for higher fertility. Very few among them (29%) had knowledge of antenatal care. They expressed faulty knowledge, myths and unhelpful attitudes towards sexual health matters. The study revealed the male Scheduled tribe population's lack of knowledge and misinformation regarding male sexual health issues, the

  11. Effects of Activity Schedules on Challenging Behavior for Children with Autism

    ERIC Educational Resources Information Center

    Scalzo, Rachel; Davis, Tonya N.; Weston, Regan; Dukes, Elizabeth; Leeper, Dana; Min, Nandar; Mom, Allen; Stone, Jessica; Weber, Alex

    2017-01-01

    This study examined activity schedules as an intervention to decrease challenging behavior and increase academic engagement during work tasks scheduled after free play activities in three boys diagnosed with autism spectrum disorder (ASD). Functional analysis results indicated all participants' challenging behavior was maintained, at least in…

  12. 15 CFR Supplement No. 1 to Part 714 - Schedule 3 Chemicals

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Schedule 3 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 1 Supplement No. 1 to Part 714—Schedule 3 Chemicals...

  13. 15 CFR Supplement No. 1 to Part 713 - Schedule 2 Chemicals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Schedule 2 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 1 Supplement No. 1 to Part 713—Schedule 2 Chemicals...

  14. 15 CFR Supplement No. 1 to Part 712 - Schedule 1 Chemicals

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Schedule 1 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 1 Supplement No. 1 to Part 712—Schedule 1 Chemicals...

  15. 15 CFR Supplement No. 1 to Part 712 - Schedule 1 Chemicals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Schedule 1 Chemicals no. Supplement no... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 1 Supplement no. 1 to Part 712—Schedule 1 Chemicals...

  16. 15 CFR Supplement No. 1 to Part 714 - Schedule 3 Chemicals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Schedule 3 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 1 Supplement No. 1 to Part 714—Schedule 3 Chemicals...

  17. 15 CFR Supplement No. 1 to Part 713 - Schedule 2 Chemicals

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Schedule 2 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 1 Supplement No. 1 to Part 713—Schedule 2 Chemicals...

  18. 15 CFR Supplement No. 1 to Part 714 - Schedule 3 Chemicals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Schedule 3 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 1 Supplement No. 1 to Part 714—Schedule 3 Chemicals...

  19. 15 CFR Supplement No. 1 to Part 714 - Schedule 3 Chemicals

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Schedule 3 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 1 Supplement No. 1 to Part 714—Schedule 3 Chemicals...

  20. 15 CFR Supplement No. 1 to Part 713 - Schedule 2 Chemicals

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Schedule 2 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 1 Supplement No. 1 to Part 713—Schedule 2 Chemicals...

  1. 15 CFR Supplement No. 1 to Part 712 - Schedule 1 Chemicals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Schedule 1 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 1 Supplement No. 1 to Part 712—Schedule 1 Chemicals...

  2. 15 CFR Supplement No. 1 to Part 712 - Schedule 1 Chemicals

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Schedule 1 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 1 Supplement No. 1 to Part 712—Schedule 1 Chemicals...

  3. 15 CFR Supplement No. 1 to Part 713 - Schedule 2 Chemicals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Schedule 2 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 1 Supplement No. 1 to Part 713—Schedule 2 Chemicals...

  4. 15 CFR Supplement No. 1 to Part 712 - Schedule 1 Chemicals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 2 2014-01-01 2014-01-01 false Schedule 1 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 1 Supplement No. 1 to Part 712—Schedule 1 Chemicals...

  5. 15 CFR Supplement No. 1 to Part 713 - Schedule 2 Chemicals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 2 2014-01-01 2014-01-01 false Schedule 2 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 1 Supplement No. 1 to Part 713—Schedule 2 Chemicals...

  6. 15 CFR Supplement No. 1 to Part 714 - Schedule 3 Chemicals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 2 2014-01-01 2014-01-01 false Schedule 3 Chemicals No. Supplement No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 1 Supplement No. 1 to Part 714—Schedule 3 Chemicals...

  7. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  8. Using Activity Schedules to Promote Varied Application Use in Children with Autism

    ERIC Educational Resources Information Center

    Brodhead, Matthew T.; Courtney, William Timothy; Thaxton, Jackie R.

    2018-01-01

    We evaluated the effects of an activity schedule embedded within an iPad on varied play across applications. After establishing a pattern of repetitive gameplay, we taught three children with autism to follow the activity schedule using physical guidance. All participants increased their varied play to four applications per session and…

  9. 15 CFR 712.9 - Deadlines for submission of Schedule 1 declarations, reports, advance notifications, and amendments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.9... notifications, and amendments include: (a) Annual declaration on past activities (Schedule 1 chemical production during the previous calendar year); (b) Annual report on exports and imports of Schedule 1 chemicals from...

  10. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  11. 15 CFR 714.6 - Deadlines for submission of Schedule 3 declarations, reports, and amendments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.6 Deadlines for submission... past activities (production of Schedule 3 chemicals during the previous calendar year); (b) Annual...

  12. 15 CFR 714.6 - Deadlines for submission of Schedule 3 declarations, reports, and amendments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.6 Deadlines for submission... past activities (production of Schedule 3 chemicals during the previous calendar year); (b) Annual...

  13. Scheduling Dependent Real-Time Activities

    DTIC Science & Technology

    1990-08-01

    dependency relationships in a way that is suitable for all real - time systems . This thesis provides an algorithm, called DASA, that is effective for...scheduling the class of real - time systems known as supervisory control systems. Simulation experiments that account for the time required to make scheduling

  14. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance declaration requirements for additionally planned production of Schedule 3 chemicals. (a) Declaration... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade...

  15. School Involvement Leave: Providing Leave for Parental Involvement in School Activities. Policy Briefing Series. Issue 18

    ERIC Educational Resources Information Center

    Curlew, Mary; Weber, Julie

    2009-01-01

    One of the most important factors in school performance is parental involvement. However, many parents do not have the flexibility in their work schedules or the leave policies necessary to attend school functions. As a result, legislators are creating policies to address this issue. School involvement leave policies provide parents with…

  16. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  17. Effect of Uncertainty on Deterministic Runway Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2012-01-01

    Active runway scheduling involves scheduling departures for takeoffs and arrivals for runway crossing subject to numerous constraints. This paper evaluates the effect of uncertainty on a deterministic runway scheduler. The evaluation is done against a first-come- first-serve scheme. In particular, the sequence from a deterministic scheduler is frozen and the times adjusted to satisfy all separation criteria; this approach is tested against FCFS. The comparison is done for both system performance (throughput and system delay) and predictability, and varying levels of congestion are considered. The modeling of uncertainty is done in two ways: as equal uncertainty in availability at the runway as for all aircraft, and as increasing uncertainty for later aircraft. Results indicate that the deterministic approach consistently performs better than first-come-first-serve in both system performance and predictability.

  18. Teaching children with autism to use photographic activity schedules: maintenance and generalization of complex response chains.

    PubMed Central

    MacDuff, G S; Krantz, P J; McClannahan, L E

    1993-01-01

    We used a graduated guidance procedure to teach 4 boys with autism to follow photographic activity schedules to increase on-task and on-schedule behavior. The multiple baseline across participants design included baseline, teaching, maintenance, resequencing of photographs, and generalization to novel photographs phases. The results indicated that photographic activity schedules (albums depicting after-school activities) produced sustained engagement, and skills generalized to a new sequence of photographs and to new photographs. The acquisition of schedule-following skills enabled these children with severe developmental disabilities to display lengthy response chains, independently change activities, and change activities in different group home settings in the absence of immediate supervision and prompts from others. PMID:8473261

  19. 15 CFR 712.9 - Deadlines for submission of Schedule 1 declarations, reports, advance notifications, and amendments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.9... notifications, and amendments include: (a) Annual declaration on past activities (Schedule 1 chemical production...

  20. Utilizing AI in Temporal, Spatial, and Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Stottler, Richard; Kalton, Annaka; Bell, Aaron

    2006-01-01

    Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

  1. Effectiveness of Instruction Performed through Computer-Assisted Activity Schedules on On-Schedule and Role-Play Skills of Children with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Ulke-Kurkcuoglu, Burcu; Bozkurt, Funda; Cuhadar, Selmin

    2015-01-01

    This study aims to investigate the effectiveness of the instruction process provided through computer-assisted activity schedules in the instruction of on-schedule and role-play skills to children with autism spectrum disorder. Herein, a multiple probe design with probe conditions across participants among single subject designs was used. Four…

  2. 15 CFR 713.7 - Deadlines for submission of Schedule 2 declarations, reports, and amendments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.7 Deadlines for submission... (production, processing, or consumption of Schedule 2 chemicals during the previous calendar year); (b) Annual...

  3. 15 CFR 713.7 - Deadlines for submission of Schedule 2 declarations, reports, and amendments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.7 Deadlines for submission... (production, processing, or consumption of Schedule 2 chemicals during the previous calendar year); (b) Annual...

  4. Use of Activity Schedule to Promote Independent Performance of Individuals with Autism and Other Intellectual Disabilities: A Review

    ERIC Educational Resources Information Center

    Koyama, Takanori; Wang, Hui-Ting

    2011-01-01

    A literature review was conducted on the effectiveness of activity schedules. Twenty three studies that a) were peer-reviewed, b) were experimental, c) implemented activity schedule as a primary intervention, d) incorporated multiple activities, and e) aimed to teach learners to self-manage individual schedules were included in the review. The…

  5. 15 CFR 713.3 - Annual declaration and reporting requirements for exports and imports of Schedule 2 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.3 Annual declaration and reporting requirements for exports and imports of Schedule 2 chemicals. (a) Declarations and... requirements for exports and imports of Schedule 2 chemicals. 713.3 Section 713.3 Commerce and Foreign Trade...

  6. Using Visual Activity Schedules for Young Children with Challenging Behavior

    ERIC Educational Resources Information Center

    Zimmerman, Kathleen N.; Ledford, Jennifer R.; Barton, Erin E.

    2017-01-01

    Young children with challenging behavior may require individualized interventions to facilitate improved outcomes. Visual activity schedules (VAS) have been well documented for improving engagement, transition, and recreation behaviors with children with autism spectrum disorder (ASD) and intellectual disabilities (ID). However, children…

  7. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance...

  8. 15 CFR Supplement No. 2 to Part 713 - Deadlines for Submission of Schedule 2 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical... exports or imports of a Schedule 2 chemical by a plant site, trading company, or other person subject to...

  9. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  10. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2... Schedule 3 chemical exceeded the declaration threshold in § 714.1(a)(1)(i) of the CWCR. Annual Report on... year in which exports or imports of a Schedule 3 chemical by a plant site, trading company, or other...

  11. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... year in which exports or imports of a Schedule 3 chemical by a plant site, trading company, or other... chemical and the export or import of the same or a different Schedule 3 chemical by a declared plant site... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2...

  12. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... year in which exports or imports of a Schedule 3 chemical by a plant site, trading company, or other... chemical and the export or import of the same or a different Schedule 3 chemical by a declared plant site... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2...

  13. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Planning and scheduling real estate activities. 644.8 Section 644.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY... Appropriations Committee in establishing the Fund are contained in House Committee Report No. 91-1219, 91st...

  14. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  15. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  16. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  17. A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

    NASA Technical Reports Server (NTRS)

    Potter, William; Gasch, John; Bauer, Cynthia

    1998-01-01

    Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule

  18. Vehicle and driver scheduling for public transit.

    DOT National Transportation Integrated Search

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  19. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  20. 15 CFR Supplement No. 2 to Part 712 - Deadlines for Submission of Schedule 1 Declarations, Advance Notifications, Reports, and Amendments

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 2 Supplement No. 2 to Part 712—Deadlines for Submission of Schedule 1 Declarations... following any calendar year in which more than 100 grams aggregate of Schedule 1 chemicals were produced...

  1. 15 CFR Supplement No. 2 to Part 712 - Deadlines for Submission of Schedule 1 Declarations, Advance Notifications, Reports, and Amendments

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS Pt. 712, Supp. 2 Supplement no. 2 to Part 712—Deadlines for Submission of Schedule 1 Declarations... following any calendar year in which more than 100 grams aggregate of Schedule 1 chemicals were produced...

  2. 15 CFR 712.5 - Annual declaration requirements for facilities engaged in the production of Schedule 1 chemicals...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.5 Annual declaration requirements for facilities engaged in... facilities engaged in the production of Schedule 1 chemicals for purposes not prohibited by the CWC. 712.5...

  3. 15 CFR 713.3 - Annual declaration and reporting requirements for exports and imports of Schedule 2 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements for exports and imports of Schedule 2 chemicals. 713.3 Section 713.3 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.3 Annual...

  4. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  5. An investigation of the use of temporal decomposition in space mission scheduling

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley E.; Narayanan, Venkat

    1994-01-01

    This research involves an examination of techniques for solving scheduling problems in long-duration space missions. The mission timeline is broken up into several time segments, which are then scheduled incrementally. Three methods are presented for identifying the activities that are to be attempted within these segments. The first method is a mathematical model, which is presented primarily to illustrate the structure of the temporal decomposition problem. Since the mathematical model is bound to be computationally prohibitive for realistic problems, two heuristic assignment procedures are also presented. The first heuristic method is based on dispatching rules for activity selection, and the second heuristic assigns performances of a model evenly over timeline segments. These heuristics are tested using a sample Space Station mission and a Spacelab mission. The results are compared with those obtained by scheduling the missions without any problem decomposition. The applicability of this approach to large-scale mission scheduling problems is also discussed.

  6. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  7. 15 CFR Supplement No. 2 to Part 713 - Deadlines for Submission of Schedule 2 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical...

  8. Scheduled physical activity is associated with better academic performance in Chilean school-age children.

    PubMed

    Burrows, Raquel; Correa-Burrows, Paulina; Orellana, Yasna; Almagiá, Atilio; Lizana, Pablo; Ivanovic, Daniza

    2014-11-01

    This study was carried out to examine the association between systematic physical activity and academic performance in school kids after controlling for potential sociodemographic and educational confounders. In a random sample of 1271 students from urban Santiago, attending 5th and 9th grade, who took the 2009 System for the Assessment of Educational Quality (SIMCE) tests, we measured physical activity habits, anthropometric characteristics, and socioeconomic status. Academic performance was measured by the standardized SIMCE tests. Logistic regressions assessed the relationship between the allocation of time to weekly scheduled exercise, potential confounding factors, and individual academic performance. About 80% of students reported less than 2 hours of weekly scheduled exercise, while 10.6% and 10.2% reported 2 to 4 hours/week and more than 4 hours/week, respectively. Devoting more than 4 hours/week to scheduled exercise significantly increased (P < .01) the odds of having SIMCE composite z-scores ≥ 50th percentile (OR: 2.3, 95% CI: 1.4 to 3.6) and ≥ 75th percentile (OR: 2.1, 95% CI: 1.3-3.3). Better academic performance was associated with a higher allocation of time to scheduled exercise in school-age children.

  9. Increasing Completion of Classroom Routines through the Use of Picture Activity Schedules

    ERIC Educational Resources Information Center

    Watson, Kamille J.; DiCarlo, Cynthia F.

    2016-01-01

    Teachers spend the first few days of school teaching routines to children that will help transitions in the classroom between different activities. When children have difficulty, they move more slowly and/or require teacher prompting. A picture activity schedule intervention (Breitfelder in Teach Except Child Plus 4(5):2-15, 2008; Bryan and Gast…

  10. Maintaining High Ambulatory Activity Levels of Sedentary Adults with a Reinforcement Thinning Schedule

    PubMed Central

    Andrade, Leonardo F.; Barry, Danielle; Litt, Mark D.; Petry, Nancy M.

    2016-01-01

    Physical inactivity is a leading cause of mortality. Reinforcement interventions appear useful for increasing activity and preventing adverse consequences of sedentary lifestyles. This study evaluated a reinforcement thinning schedule for maintaining high activity levels. Sedentary adults (n=77) were given pedometers and encouraged to walk ≥10,000 steps/day. Initially, all participants earned rewards for each day they walked ≥10,000 steps. Subsequently, 61 participants were randomized to a monitoring only condition or a monitoring plus reinforcement thinning condition, in which frequencies of monitoring and reinforcing walking decreased over 12 weeks. The mean ± SD percentage of participants in the monitoring plusreinforcement thinning condition who met walking goals was 83% ± 24% versus. 55% ± 31% for participants in the monitoring only condition, p < .001. Thus, this monitoring plusreinforcement thinning schedule maintained high rates of walking when it was in effect; however, groups did not differ at a 24-week follow-up. Monitoring plus reinforcement thinning schedules, nevertheless, hold potential to extend benefits of reinforcement interventions at low costs. PMID:25041789

  11. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  12. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2... Schedule 3 chemical exceeded the declaration threshold in § 714.1(a)(1)(i) of the CWCR. Annual Report on...

  13. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  14. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  15. 15 CFR 713.1 - Prohibition on exports and imports of Schedule 2 chemicals to and from States not Party to the CWC.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.1 Prohibition on exports and imports of Schedule 2 chemicals to and from States not Party to the... Schedule 2 chemicals to and from States not Party to the CWC. 713.1 Section 713.1 Commerce and Foreign...

  16. An Optimal CDS Construction Algorithm with Activity Scheduling in Ad Hoc Networks

    PubMed Central

    Penumalli, Chakradhar; Palanichamy, Yogesh

    2015-01-01

    A new energy efficient optimal Connected Dominating Set (CDS) algorithm with activity scheduling for mobile ad hoc networks (MANETs) is proposed. This algorithm achieves energy efficiency by minimizing the Broadcast Storm Problem [BSP] and at the same time considering the node's remaining energy. The Connected Dominating Set is widely used as a virtual backbone or spine in mobile ad hoc networks [MANETs] or Wireless Sensor Networks [WSN]. The CDS of a graph representing a network has a significant impact on an efficient design of routing protocol in wireless networks. Here the CDS is a distributed algorithm with activity scheduling based on unit disk graph [UDG]. The node's mobility and residual energy (RE) are considered as parameters in the construction of stable optimal energy efficient CDS. The performance is evaluated at various node densities, various transmission ranges, and mobility rates. The theoretical analysis and simulation results of this algorithm are also presented which yield better results. PMID:26221627

  17. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  18. 15 CFR 712.6 - Advance notification and annual report of all exports and imports of Schedule 1 chemicals to, or...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.6 Advance notification and annual report of all exports and imports of... of all exports and imports of Schedule 1 chemicals to, or from, other States Parties. 712.6 Section...

  19. 15 CFR 712.6 - Advance notification and annual report of all exports and imports of Schedule 1 chemicals to, or...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.6 Advance notification and annual report of all exports and imports of... of all exports and imports of Schedule 1 chemicals to, or from, other States Parties. 712.6 Section...

  20. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  1. Intermittent Metronomic Drug Schedule Is Essential for Activating Antitumor Innate Immunity and Tumor Xenograft Regression12

    PubMed Central

    Chen, Chong-Sheng; Doloff, Joshua C; Waxman, David J

    2014-01-01

    Metronomic chemotherapy using cyclophosphamide (CPA) is widely associated with antiangiogenesis; however, recent studies implicate other immune-based mechanisms, including antitumor innate immunity, which can induce major tumor regression in implanted brain tumor models. This study demonstrates the critical importance of drug schedule: CPA induced a potent antitumor innate immune response and tumor regression when administered intermittently on a 6-day repeating metronomic schedule but not with the same total exposure to activated CPA administered on an every 3-day schedule or using a daily oral regimen that serves as the basis for many clinical trials of metronomic chemotherapy. Notably, the more frequent metronomic CPA schedules abrogated the antitumor innate immune and therapeutic responses. Further, the innate immune response and antitumor activity both displayed an unusually steep dose-response curve and were not accompanied by antiangiogenesis. The strong recruitment of innate immune cells by the 6-day repeating CPA schedule was not sustained, and tumor regression was abolished, by a moderate (25%) reduction in CPA dose. Moreover, an ∼20% increase in CPA dose eliminated the partial tumor regression and weak innate immune cell recruitment seen in a subset of the every 6-day treated tumors. Thus, metronomic drug treatment must be at a sufficiently high dose but also sufficiently well spaced in time to induce strong sustained antitumor immune cell recruitment. Many current clinical metronomic chemotherapeutic protocols employ oral daily low-dose schedules that do not meet these requirements, suggesting that they may benefit from optimization designed to maximize antitumor immune responses. PMID:24563621

  2. A format for the interchange of scheduling models

    NASA Technical Reports Server (NTRS)

    Jaap, John P.; Davis, Elizabeth K.

    1994-01-01

    In recent years a variety of space-activity schedulers have been developed within the aerospace community. Space-activity schedulers are characterized by their need to handle large numbers of activities which are time-window constrained and make high demands on many scarce resources, but are minimally constrained by predecessor/successor requirements or critical paths. Two needs to exchange data between these schedulers have materialized. First, there is significant interest in comparing and evaluating the different scheduling engines to ensure that the best technology is applied to each scheduling endeavor. Second, there is a developing requirement to divide a single scheduling task among different sites, each using a different scheduler. In fact, the scheduling task for International Space Station Alpha (ISSA) will be distributed among NASA centers and among the international partners. The format used to interchange scheduling data for ISSA will likely use a growth version of the format discussed in this paper. The model interchange format (or MIF, pronounced as one syllable) discussed in this paper is a robust solution to the need to interchange scheduling requirements for space activities. It is highly extensible, human-readable, and can be generated or edited with common text editors. It also serves well the need to support a 'benchmark' data case which can be delivered on any computer platform.

  3. 15 CFR 714.2 - Annual reporting requirements for exports and imports in excess of 30 metric tons of Schedule 3...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.2 Annual reporting requirements for exports and imports in excess of 30 metric tons of... exports and imports in excess of 30 metric tons of Schedule 3 chemicals. 714.2 Section 714.2 Commerce and...

  4. 15 CFR 714.2 - Annual reporting requirements for exports and imports in excess of 30 metric tons of Schedule 3...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.2 Annual reporting requirements for exports and imports in excess of 30 metric tons of... exports and imports in excess of 30 metric tons of Schedule 3 chemicals. 714.2 Section 714.2 Commerce and...

  5. Using Activity Schedules to Increase On-Task Behavior in Children at Risk for Attention-Deficit/Hyperactivity Disorder

    ERIC Educational Resources Information Center

    Cirelli, Christe A.; Sidener, Tina M.; Reeve, Kenneth F.; Reeve, Sharon A.

    2016-01-01

    The effects of activity schedules on on-task and on-schedule behavior were assessed with two boys at risk for attention-deficit/hyperactivity disorder (ADHD) and referred by their public school teachers as having difficulty during independent work time. On-task behavior increased for both participants after two training sessions. Teachers, peers,…

  6. An Evaluation of Photographic Activity Schedules to Increase Independent Playground Skills in Young Children with Autism

    ERIC Educational Resources Information Center

    Akers, Jessica S.; Higbee, Thomas S.; Pollard, Joy S.; Pellegrino, Azure J.; Gerencser, Kristina R.

    2016-01-01

    We used photographic activity schedules to increase the number of play activities completed by children with autism during unstructured time on the playground. All 3 participants engaged in more playground activities during and after training, and they continued to complete activities when novel photographs were introduced.

  7. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  8. 15 CFR 713.1 - Prohibition on exports and imports of Schedule 2 chemicals to and from States not Party to the CWC.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Schedule 2 chemicals to and from States not Party to the CWC. 713.1 Section 713.1 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS...

  9. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    NASA Astrophysics Data System (ADS)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education

  10. Optimal stimulus scheduling for active estimation of evoked brain networks

    NASA Astrophysics Data System (ADS)

    Kafashan, MohammadMehdi; Ching, ShiNung

    2015-12-01

    Objective. We consider the problem of optimal probing to learn connections in an evoked dynamic network. Such a network, in which each edge measures an input-output relationship between sites in sensor/actuator-space, is relevant to emerging applications in neural mapping and neural connectivity estimation. Approach. We show that the problem of scheduling nodes to a probe (i.e., stimulate) amounts to a problem of optimal sensor scheduling. Main results. By formulating the evoked network in state-space, we show that the solution to the greedy probing strategy has a convenient form and, under certain conditions, is optimal over a finite horizon. We adopt an expectation maximization technique to update the state-space parameters in an online fashion and demonstrate the efficacy of the overall approach in a series of detailed numerical examples. Significance. The proposed method provides a principled means to actively probe time-varying connections in neuronal networks. The overall method can be implemented in real time and is particularly well-suited to applications in stimulation-based cortical mapping in which the underlying network dynamics are changing over time.

  11. Optimal stimulus scheduling for active estimation of evoked brain networks.

    PubMed

    Kafashan, MohammadMehdi; Ching, ShiNung

    2015-12-01

    We consider the problem of optimal probing to learn connections in an evoked dynamic network. Such a network, in which each edge measures an input-output relationship between sites in sensor/actuator-space, is relevant to emerging applications in neural mapping and neural connectivity estimation. We show that the problem of scheduling nodes to a probe (i.e., stimulate) amounts to a problem of optimal sensor scheduling. By formulating the evoked network in state-space, we show that the solution to the greedy probing strategy has a convenient form and, under certain conditions, is optimal over a finite horizon. We adopt an expectation maximization technique to update the state-space parameters in an online fashion and demonstrate the efficacy of the overall approach in a series of detailed numerical examples. The proposed method provides a principled means to actively probe time-varying connections in neuronal networks. The overall method can be implemented in real time and is particularly well-suited to applications in stimulation-based cortical mapping in which the underlying network dynamics are changing over time.

  12. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  13. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  14. Nontraditional work schedules for pharmacists.

    PubMed

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  15. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, there are many reasons why the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  16. Experiments with a decision-theoretic scheduler

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Holt, Gerhard; Mayer, Andrew

    1992-01-01

    This paper describes DTS, a decision-theoretic scheduler designed to employ state-of-the-art probabilistic inference technology to speed the search for efficient solutions to constraint-satisfaction problems. Our approach involves assessing the performance of heuristic control strategies that are normally hard-coded into scheduling systems, and using probabilistic inference to aggregate this information in light of features of a given problem. BPS, the Bayesian Problem-Solver, introduced a similar approach to solving single-agent and adversarial graph search problems, yielding orders-of-magnitude improvement over traditional techniques. Initial efforts suggest that similar improvements will be realizable when applied to typical constraint-satisfaction scheduling problems.

  17. An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

    NASA Technical Reports Server (NTRS)

    Garcia, Christopher; Rabadi, Ghaith

    2010-01-01

    Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

  18. Scheduling lessons learned from the Autonomous Power System

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  19. The temporal organization of behavior on periodic food schedules.

    PubMed Central

    Reid, A K; Bacha, G; Morán, C

    1993-01-01

    Various theories of temporal control and schedule induction imply that periodic schedules temporally modulate an organism's motivational states within interreinforcement intervals. This speculation has been fueled by frequently observed multimodal activity distributions created by averaging across interreinforcement intervals. We tested this hypothesis by manipulating the cost associated with schedule-induced activities and the availability of other activities to determine the degree to which (a) the temporal distributions of activities within the interreinforcement interval are fixed or can be temporally displaced, (b) rats can reallocate activities across different interreinforcement intervals, and (c) noninduced activities can substitute for schedule-induced activities. Obtained multimodal activity distributions created by averaging across interreinforcement intervals were not representative of the transitions occurring within individual intervals, so the averaged multimodal distributions should not be assumed to represent changes in the subject's motivational states within the interval. Rather, the multimodal distributions often result from averaging across interreinforcement intervals in which only a single activity occurs. A direct influence of the periodic schedule on the motivational states implies that drinking and running should occur at different periods within the interval, but in three experiments the starting times of drinking and running within interreinforcement intervals were equal. Thus, the sequential pattern of drinking and running on periodic schedules does not result from temporal modulation of motivational states within interreinforcement intervals. PMID:8433061

  20. Contagious flexibility? A study on whether schedule flexibility facilitates work-life enrichment.

    PubMed

    Pedersen, Vivi Bach; Jeppesen, Hans Jeppe

    2012-08-01

    Schedule flexibility defines an important generating resource for work-life enrichment; however, our knowledge about how such spillovers take place is limited. This multiple case study examines how workers from different working time contexts with varying levels of schedule flexibility experience work-life interplay. Given the adopted explorative design, it is important to interpret the findings in a tentative light. Nonetheless, the study offers important insight into work-life enrichment that may guide future research in this field. The findings indicate that schedule flexibility may act as a boundary-spanning resource owing to the agency potential it offers workers. Thus, it seemed that flexible schedule opportunities enabled workers to engage more fully in personal life activities, which in turn had a positive influence on their work involvement through positive affect. Such positive role engagements appeared, however, to be greatly determined by workers' boundary management and by time conditions of work and family. In conclusion, the major findings and limitation of the study are discussed against existing research and theory. © 2012 The Authors. Scandinavian Journal of Psychology © 2012 The Scandinavian Psychological Associations.

  1. Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

    NASA Technical Reports Server (NTRS)

    Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John

    1994-01-01

    The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications

  2. Impact of scheduling multiple outdoor free-play periods in childcare on child moderate-to-vigorous physical activity: a cluster randomised trial.

    PubMed

    Razak, Lubna Abdul; Yoong, Sze Lin; Wiggers, John; Morgan, Philip J; Jones, Jannah; Finch, Meghan; Sutherland, Rachel; Lecathelnais, Christophe; Gillham, Karen; Clinton-McHarg, Tara; Wolfenden, Luke

    2018-04-04

    Increasing the frequency of periods of outdoor free-play in childcare may represent an opportunity to increase child physical activity. This study aimed to assess the efficacy of scheduling multiple periods of outdoor free-play in increasing the time children spend in moderate-to-vigorous physical activity (MVPA) while attending childcare. The study employed a cluster randomised controlled trial design involving children aged 3 to 6 years, attending ten childcare services in the Hunter New England region of New South Wales, Australia. Five services were randomised to receive the intervention and five to a control condition. The intervention involved services scheduling three separate periods of outdoor free-play from 9 am to 3 pm per day, each at least 15 min in duration, with the total equivalent to their usual daily duration of outdoor play period. Control services implemented the usual single continuous period of outdoor free-play over this time. The primary outcome, children's moderate-to-vigorous physical activity (MVPA) while in care per day, was measured over 5 days via accelerometers at baseline and at 3 months post baseline. Secondary outcomes included percentage of time spent in MVPA while in care per day, total physical activity while in care per day and documented child injury, a hypothesised potential unintended adverse event. Childcare services and data collectors were not blind to the experimental group allocation. Parents of 439 (71.6%) children attending participating childcare services consented for their child to participate in the trial. Of these, 316 (72.0%) children provided valid accelerometer data at both time points. Relative to children in control services, mean daily minutes of MVPA in care was significantly greater at follow-up among children attending intervention services (adjusted difference between groups 5.21 min, 95% CI 0.59-9.83 p = 0.03). Percentage of time spent in MVPA in care per day was also greater at follow-up among

  3. The application of connectionism to query planning/scheduling in intelligent user interfaces

    NASA Technical Reports Server (NTRS)

    Short, Nicholas, Jr.; Shastri, Lokendra

    1990-01-01

    In the mid nineties, the Earth Observing System (EOS) will generate an estimated 10 terabytes of data per day. This enormous amount of data will require the use of sophisticated technologies from real time distributed Artificial Intelligence (AI) and data management. Without regard to the overall problems in distributed AI, efficient models were developed for doing query planning and/or scheduling in intelligent user interfaces that reside in a network environment. Before intelligent query/planning can be done, a model for real time AI planning and/or scheduling must be developed. As Connectionist Models (CM) have shown promise in increasing run times, a connectionist approach to AI planning and/or scheduling is proposed. The solution involves merging a CM rule based system to a general spreading activation model for the generation and selection of plans. The system was implemented in the Rochester Connectionist Simulator and runs on a Sun 3/260.

  4. Progressive anticipation in behavior and brain activation of rats exposed to scheduled daily palatable food.

    PubMed

    Blancas, A; González-García, S D; Rodríguez, K; Escobar, C

    2014-12-05

    Scheduled and restricted access to a palatable snack, i.e. chocolate, elicits a brief and strong anticipatory activation and entrains brain areas related with reward and motivation. This behavioral and neuronal activation persists for more than 7days when this protocol is interrupted, suggesting the participation of a time-keeping system. The process that initiates this anticipation may provide a further understanding of the time-keeping system underlying palatable food entrainment. The aim of this study was to analyze how this entraining protocol starts and to dissect neuronal structures that initiate a chocolate-entrained activation. We assessed the development of anticipation of 5g of chocolate during the first 8days of the entrainment protocol. General activity of control and chocolate-entrained rats was continuously monitored with movement sensors. Moreover, motivation to obtain the chocolate was assessed by measuring approaches and interaction responses toward a wire-mesh box containing chocolate. Neuronal activation was determined with c-Fos in reward-related brain areas. We report a progressive increase in the interaction with a box to obtain chocolate parallel to a progressive neuronal activation. A significant anticipatory activation was observed in the prefrontal cortex on day 3 of entrainment and in the nucleus accumbens on day 5, while the arcuate nucleus and pyriform cortex reached significant activation on day 8. The gradual response observed with this protocol indicates that anticipation of a rewarding food requires repetitive and predictable experiences in order to acquire a temporal estimation. We also confirm that anticipation of palatable food involves diverse brain regions. Copyright © 2014 IBRO. Published by Elsevier Ltd. All rights reserved.

  5. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    NASA Astrophysics Data System (ADS)

    Nijland, Linda; Arentze, Theo; Timmermans, Harry

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of individuals indicate the importance of incorporating those pre-planned activities in the new generation of dynamic travel demand models. Elaborating and combining previous work on event-driven activity generation, the aim of this paper is to develop and illustrate an extension of a need-based model of activity generation that takes into account possible influences of pre-planned activities and events. This paper describes the theory and shows the results of simulations of the extension. The simulation was conducted for six different activities, and the parameter values used were consistent with an earlier estimation study. The results show that the model works well and that the influences of the parameters are consistent, logical, and have clear interpretations. These findings offer further evidence of face and construct validity to the suggested modeling approach.

  6. Planning as a Precursor to Scheduling for Space Station Payload Operations

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Maxwell, Theresa

    1995-01-01

    Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

  7. Prescribed Travel Schedules for Fatigue Management

    NASA Technical Reports Server (NTRS)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  8. Expert system for on-board satellite scheduling and control

    NASA Technical Reports Server (NTRS)

    Barry, John M.; Sary, Charisse

    1988-01-01

    An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

  9. Decision-theoretic control of EUVE telescope scheduling

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1993-01-01

    This paper describes a decision theoretic scheduler (DTS) designed to employ state-of-the-art probabilistic inference technology to speed the search for efficient solutions to constraint-satisfaction problems. Our approach involves assessing the performance of heuristic control strategies that are normally hard-coded into scheduling systems and using probabilistic inference to aggregate this information in light of the features of a given problem. The Bayesian Problem-Solver (BPS) introduced a similar approach to solving single agent and adversarial graph search patterns yielding orders-of-magnitude improvement over traditional techniques. Initial efforts suggest that similar improvements will be realizable when applied to typical constraint-satisfaction scheduling problems.

  10. Soil microflora and enzyme activities in rhizosphere of Transgenic Bt cotton hybrid under different intercropping systems and plant protection schedules

    NASA Astrophysics Data System (ADS)

    Biradar, D. P.; Alagawadi, A. R.; Basavanneppa, M. A.; Udikeri, S. S.

    2012-04-01

    Field experiments were conducted over three rainy seasons of 2005-06 to 2007-08 on a Vertisol at Dharwad, Karnataka, India to study the effect of intercropping and plant protection schedules on productivity, soil microflora and enzyme activities in the rhizosphere of transgenic Bt cotton hybrid. The experiment consisted of four intercropping systems namely, Bt cotton + okra, Bt cotton + chilli, Bt cotton + onion + chilli and Bt cotton + redgram with four plant protection schedules (zero protection, protection for Bt cotton, protection for intercrop and protection for both crops). Observations on microbial populations and enzyme activities were recorded at 45, 90, 135 and 185 (at harvest) days after sowing (DAS). Averaged over years, Bt cotton + okra intercropping had significantly higher total productivity than Bt cotton + chilli and Bt cotton + redgram intercropping system and was similar to Bt cotton + chilli + onion intercropping system. With respect to plant protection schedules for bollworms, protection for both cotton and intercrops recorded significantly higher yield than the rest of the treatments. Population of total bacteria, fungi, actinomycetes, P-solubilizers, free-living N2 fixers as well as urease, phosphatase and dehydrogenase enzyme activities increased up to 135 days of crop growth followed by a decline. Among the intercropping systems, Bt cotton + chilli recorded significantly higher population of microorganisms and enzyme activities than other cropping systems. While Bt cotton with okra as intercrop recorded the least population of total bacteria and free-living N2 fixers as well as urease activity. Intercropping with redgram resulted in the least population of actinomycetes, fungi and P-solubilizers, whereas Bt cotton with chilli and onion recorded least activities of dehydrogenase and phosphatase. Among the plant protection schedules, zero protection recorded maximum population of microorganisms and enzyme activities. This was followed by the

  11. Immigrant Youth Involvement in School-Based Extracurricular Activities

    ERIC Educational Resources Information Center

    Peguero, Anthony A.

    2011-01-01

    Extracurricular activity involvement is generally beneficial toward student progress and success. Little is known, however, about immigrant youth involvement in school-based extracurricular activities. The author examined the patterns of Latino and Asian American youth extracurricular involvement by focusing on the pertinent role of immigrant…

  12. Associations between employees' work schedules and the vocational consequences of workplace injuries.

    PubMed

    Dembe, Allard E; Delbos, Rachel; Erickson, J Bianca; Banks, Steven M

    2007-12-01

    This study examines the effect of long-hour work schedules and nonstandard shift work (e.g., night and evening shifts) on the ability of injured workers to maintain productive employment following a workplace injury. Analyses were based on 13 years of data from the National Longitudinal Survey of Youth. Multivariate logistic regression analyses were performed with one of ten nonstandard schedules as the independent variable and a particular vocational consequences as the dependent variable. Vocational consequences included being unable to perform normal job duties, temporary job reassignment, working less than full time, filing a workers' compensation claim, and quitting or being fired because of the injury. Covariates in the regression model included age, gender, occupation, industry, and region. The most prominent effects of working a nonstandard schedule were a increased risk of being fired (OR = 1.81; 1.15-2.90 CI 95%), quitting (OR = 1.68; 1.20-2.36 CI 95%), or being unable to work full time (OR = 1.33; 1.08-1.64 CI 95%) following an injury, compared to injured workers in conventional schedules. Schedules involving overtime and long working hours generally had a greater impact on vocational consequences following a workplace injury than did schedules involving night, evening, and other nonstandard shift work. Occupational rehabilitation professionals need to consider the specific type of work schedule when developing effective return-to-work plans for injured workers. Special precautions need to be taken for workers returning to schedules that involve more than 12 h per day, 60 h per week, and long commutes.

  13. Coordinated Science Campaign Scheduling for Sensor Webs

    NASA Technical Reports Server (NTRS)

    Edgington, Will; Morris, Robert; Dungan, Jennifer; Williams, Jenny; Carlson, Jean; Fleming, Damian; Wood, Terri; Yorke-Smith, Neil

    2005-01-01

    Future Earth observing missions will study different aspects and interacting pieces of the Earth's eco-system. Scientists are designing increasingly complex, interdisciplinary campaigns to exploit the diverse capabilities of multiple Earth sensing assets. In addition, spacecraft platforms are being configured into clusters, trains, or other distributed organizations in order to improve either the quality or the coverage of observations. These simultaneous advances in the design of science campaigns and in the missions that will provide the sensing resources to support them offer new challenges in the coordination of data and operations that are not addressed by current practice. For example, the scheduling of scientific observations for satellites in low Earth orbit is currently conducted independently by each mission operations center. An absence of an information infrastructure to enable the scheduling of coordinated observations involving multiple sensors makes it difficult to execute campaigns involving multiple assets. This paper proposes a software architecture and describes a prototype system called DESOPS (Distributed Earth Science Observation Planning and Scheduling) that will address this deficiency.

  14. Activity-rest schedules in physically demanding work and the variation of responses with age.

    PubMed

    Kakarot, Nadine; Mueller, Friedrich; Bassarak, Claudia

    2012-01-01

    Workers in physically demanding occupations require work breaks to recover from exertion. In a laboratory setting, we investigated the impact of ergometer cycling for 7 h in two conditions with an identical total break time but with two different activity-rest schedules. We hypothesised that more frequent but shorter breaks lead to less psychophysical strain and its effects than do less frequent but longer breaks, particularly for older workers. Twenty-nine participants representing three different age groups were tested in both conditions. Heart rate, perceived exertion/tension and feelings of fatigue were assessed and used as dependent variables. Results indicate no general activity-rest differences as well as no age-related differences of break effects under the condition of subjectively equal straining load. However, heart rate was found to be lower at some measurement points in the frequent-short-break condition and perceived exertion was lower in the infrequent-long-break condition. Design of activity-rest schedules in physically demanding occupations is a key issue in the prevention of strain and hence of interest to ergonomists. Our study suggests that breaks during physically demanding work have the same effect if they are frequent and short or infrequent and long, regardless of age.

  15. A typology of place attachment and activity involvement

    Treesearch

    Andrew J. Mowen; Alan R. Graefe; Randy J. Virden

    1998-01-01

    While previous research suggests that place attachment and activity involvement impact visitor perceptions, it has not examined the simultaneous effects of these affective constructs. This study develops a typology of both place attachment and activity involvement. It examines variations between attachment-involvement levels and visitor evaluations of quality. Results...

  16. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Pt. 169a, App. B Appendix...

  17. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  18. Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Hillenius, Steven; Deliz, Ivonne; Kanefsky, Bob; Zheng, Jimin; Reagan, Marcum L.

    2017-01-01

    Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

  19. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  20. Examination of the Evidence Base for Using Visual Activity Schedules with Students with Intellectual Disability

    ERIC Educational Resources Information Center

    Spriggs, Amy D.; Mims, Pamela J.; van Dijk, Wilhelmina; Knight, Victoria F.

    2017-01-01

    We conducted a comprehensive review of the literature to establish the evidence base for using visual activity schedules (VAS) with individuals with intellectual disability. Literature published after 2005 was evaluated for quality using the criteria developed by Horner et al.; a total of 14 studies were included as acceptable. Findings suggest…

  1. Planning and Scheduling for Fleets of Earth Observing Satellites

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Jonsson, Ari; Morris, Robert; Smith, David E.; Norvig, Peter (Technical Monitor)

    2001-01-01

    We address the problem of scheduling observations for a collection of earth observing satellites. This scheduling task is a difficult optimization problem, potentially involving many satellites, hundreds of requests, constraints on when and how to service each request, and resources such as instruments, recording devices, transmitters, and ground stations. High-fidelity models are required to ensure the validity of schedules; at the same time, the size and complexity of the problem makes it unlikely that systematic optimization search methods will be able to solve them in a reasonable time. This paper presents a constraint-based approach to solving the Earth Observing Satellites (EOS) scheduling problem, and proposes a stochastic heuristic search method for solving it.

  2. Management of Temporal Constraints for Factory Scheduling.

    DTIC Science & Technology

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  3. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  4. Public Involvement in BOSC Activities

    EPA Pesticide Factsheets

    EPA policy and the Federal Advisory Committee Act provide for public involvement in committee activities primarily by open access to meetings and records and by providing the public an opportunity to submit comments to the committee.

  5. Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course

    ERIC Educational Resources Information Center

    Huelskamp, Diana

    2014-01-01

    Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…

  6. The Director of Physical Activity and Staff Involvement

    ERIC Educational Resources Information Center

    Heidorn, Brent; Centeio, Erin

    2012-01-01

    Faculty and staff involvement in the Comprehensive School Physical Activity Program (CSPAP) begins with the Director of Physical Activity (DPA) motivating them to "buy in" to the need for a CSPAP. The DPA will need to train staff to develop and integrate physical activity throughout the school day, encourage them to be involved in the before- and…

  7. Remote Collaboration on Task Scheduling for Humans at Mars

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  8. Affirmative Action: The Scheduled Castes and the Scheduled Tribes.

    ERIC Educational Resources Information Center

    Sivaramayya, B.

    This paper considers Indian affirmative action policies that provide reservations (quotas) in favor of two disadvantaged groups, the scheduled castes and the scheduled tribes. First, definitions and background are presented. The scheduled castes ("untouchables") are said to suffer from social segregation, and the scheduled tribes from…

  9. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1..., Deductions, etc. (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per...

  10. Improving Hospital-wide Patient Scheduling Decisions by Clinical Pathway Mining.

    PubMed

    Gartner, Daniel; Arnolds, Ines V; Nickel, Stefan

    2015-01-01

    Recent research has highlighted the need for solving hospital-wide patient scheduling problems. Inpatient scheduling, patient activities have to be scheduled on scarce hospital resources such that temporal relations between activities (e.g. for recovery times) are ensured. Common objectives are, among others, the minimization of the length of stay (LOS). In this paper, we consider a hospital-wide patient scheduling problem with LOS minimization based on uncertain clinical pathways. We approach the problem in three stages: First, we learn most likely clinical pathways using a sequential pattern mining approach. Second, we provide a mathematical model for patient scheduling and finally, we combine the two approaches. In an experimental study carried out using real-world data, we show that our approach outperforms baseline approaches on two metrics.

  11. Space power system scheduling using an expert system

    NASA Technical Reports Server (NTRS)

    Bahrami, K. A.; Biefeld, E.; Costello, L.; Klein, J. W.

    1986-01-01

    A most pressing problem in space exploration is timely spacecraft power system sequence generation, which requires the scheduling of a set of loads given a set of resource constraints. This is particularly important after an anomaly or failure. This paper discusses the power scheduling problem and how the software program, Plan-It, can be used as a consultant for scheduling power system activities. Modeling of power activities, human interface, and two of the many strategies used by Plan-It are discussed. Preliminary results showing the development of a conflict-free sequence from an initial sequence with conflicts is presented. It shows that a 4-day schedule can be generated in a matter of a few minutes, which provides sufficient time in many cases to aid the crew in the replanning of loads and generation use following a failure or anomaly.

  12. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents.

    PubMed

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T

    2016-02-01

    Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012-2013 academic year. The 4 metrics of schedule quality that were compared between the 2010-2011 and 2012-2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs.

  13. 15 CFR 714.1 - Annual declaration requirements for plant sites that produce a Schedule 3 chemical in excess of...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... in the production of a chemical in any units within the same plant through chemical reaction... plant sites that produce a Schedule 3 chemical in excess of 30 metric tons. 714.1 Section 714.1 Commerce... AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING...

  14. 15 CFR 714.1 - Annual declaration requirements for plant sites that produce a Schedule 3 chemical in excess of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... in the production of a chemical in any units within the same plant through chemical reaction... plant sites that produce a Schedule 3 chemical in excess of 30 metric tons. 714.1 Section 714.1 Commerce... AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING...

  15. 15 CFR 714.1 - Annual declaration requirements for plant sites that produce a Schedule 3 chemical in excess of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in the production of a chemical in any units within the same plant through chemical reaction... plant sites that produce a Schedule 3 chemical in excess of 30 metric tons. 714.1 Section 714.1 Commerce... AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING...

  16. 15 CFR 714.1 - Annual declaration requirements for plant sites that produce a Schedule 3 chemical in excess of...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in the production of a chemical in any units within the same plant through chemical reaction... plant sites that produce a Schedule 3 chemical in excess of 30 metric tons. 714.1 Section 714.1 Commerce... AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING...

  17. 15 CFR 714.1 - Annual declaration requirements for plant sites that produce a Schedule 3 chemical in excess of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in the production of a chemical in any units within the same plant through chemical reaction... plant sites that produce a Schedule 3 chemical in excess of 30 metric tons. 714.1 Section 714.1 Commerce... AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING...

  18. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  19. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  20. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  1. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  2. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  3. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  4. Creative employee scheduling in the health information management department.

    PubMed

    Hyde, C S

    1998-02-01

    What effect do schedules have on employees and department activities? Negative effects such as backlogs, poor employee morale, and absenteeism may be due to scheduling practices currently in place. The value of effective employee scheduling practices may be seen in areas of improved productivity. The process of developing schedules should include assessing department areas, understanding operational needs, choosing an option, and implementation. Finding a schedule that meets the needs of managers as well as those of the employees is rewarding. It is a win-win situation, and the benefits can yield increased productivity, decreased turnover, and higher morale.

  5. A Comparison of Techniques for Scheduling Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2004-01-01

    Scheduling observations by coordinated fleets of Earth Observing Satellites (EOS) involves large search spaces, complex constraints and poorly understood bottlenecks, conditions where evolutionary and related algorithms are often effective. However, there are many such algorithms and the best one to use is not clear. Here we compare multiple variants of the genetic algorithm: stochastic hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on ten realistically-sized EOS scheduling problems. Schedules are represented by a permutation (non-temperal ordering) of the observation requests. A simple deterministic scheduler assigns times and resources to each observation request in the order indicated by the permutation, discarding those that violate the constraints created by previously scheduled observations. Simulated annealing performs best. Random mutation outperform a more 'intelligent' mutator. Furthermore, the best mutator, by a small margin, was a novel approach we call temperature dependent random sampling that makes large changes in the early stages of evolution and smaller changes towards the end of search.

  6. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  7. Achieving reutilization of scheduling software through abstraction and generalization

    NASA Technical Reports Server (NTRS)

    Wilkinson, George J.; Monteleone, Richard A.; Weinstein, Stuart M.; Mohler, Michael G.; Zoch, David R.; Tong, G. Michael

    1995-01-01

    Reutilization of software is a difficult goal to achieve particularly in complex environments that require advanced software systems. The Request-Oriented Scheduling Engine (ROSE) was developed to create a reusable scheduling system for the diverse scheduling needs of the National Aeronautics and Space Administration (NASA). ROSE is a data-driven scheduler that accepts inputs such as user activities, available resources, timing contraints, and user-defined events, and then produces a conflict-free schedule. To support reutilization, ROSE is designed to be flexible, extensible, and portable. With these design features, applying ROSE to a new scheduling application does not require changing the core scheduling engine, even if the new application requires significantly larger or smaller data sets, customized scheduling algorithms, or software portability. This paper includes a ROSE scheduling system description emphasizing its general-purpose features, reutilization techniques, and tasks for which ROSE reuse provided a low-risk solution with significant cost savings and reduced software development time.

  8. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    NASA Technical Reports Server (NTRS)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  9. Block scheduling: Instructional practices in high school science classrooms

    NASA Astrophysics Data System (ADS)

    Richelsoph, Barry

    Proponents of block scheduling perceive this approach to be a 'structural lever' to invite and impel teachers to change their teaching (Marshak, 1997). This desired shift is supposed to be manifest in movement from the traditional classroom structure, focusing on the teacher as lecturer or transmitter of subject matter, to that of teacher as coach with students as active learners, engaged in a variety of activities involving them individually and collaboratively in their education (Canady & Rettig, 1995). Block scheduling changes the formal structure of the school day, but does it really change pedagogical practices in high school science classrooms? Fraser's Individualized Classroom Environment Questionnaire (ICEQ) the instrument used in this study of science classes in five block-scheduled high schools in Connecticut, incorporates the tenets for an enriched classroom environment in its five scales or constructs: Participation---Extent to which students are encouraged to participate rather than be passive learners; Personalization---Emphasis on opportunities for individual students to interact with the teacher and on concern for the personal welfare and social growth of the individual; Investigation---Emphasis on the skills and processes of inquiry and their use in problem solving and investigation. Independence---Extent to which students are allowed to make decisions and have control over their own learning environment and behavior; Differentiation---Emphasis on the selective treatment of students on the basis of ability, learning style, interests, and rate of working (Fraser, 1990). The results and conclusions from this research study suggested that the block-scheduled high school science classes that participated in this research do promote, to varying degrees, those tenets that define an enriched classroom environment. Both the teachers and their classes of students perceived opportunities for Participation, Personalization, and Investigation constructs as

  10. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Germain, Shawn St.; Thomas, Kenneth; Farris, Ronald

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependentmore » activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  11. Reliability-based optimization of maintenance scheduling of mechanical components under fatigue

    PubMed Central

    Beaurepaire, P.; Valdebenito, M.A.; Schuëller, G.I.; Jensen, H.A.

    2012-01-01

    This study presents the optimization of the maintenance scheduling of mechanical components under fatigue loading. The cracks of damaged structures may be detected during non-destructive inspection and subsequently repaired. Fatigue crack initiation and growth show inherent variability, and as well the outcome of inspection activities. The problem is addressed under the framework of reliability based optimization. The initiation and propagation of fatigue cracks are efficiently modeled using cohesive zone elements. The applicability of the method is demonstrated by a numerical example, which involves a plate with two holes subject to alternating stress. PMID:23564979

  12. An interpolated activity during the knowledge-of-results delay interval eliminates the learning advantages of self-controlled feedback schedules.

    PubMed

    Carter, Michael J; Ste-Marie, Diane M

    2017-03-01

    The learning advantages of self-controlled knowledge-of-results (KR) schedules compared to yoked schedules have been linked to the optimization of the informational value of the KR received for the enhancement of one's error-detection capabilities. This suggests that information-processing activities that occur after motor execution, but prior to receiving KR (i.e., the KR-delay interval) may underlie self-controlled KR learning advantages. The present experiment investigated whether self-controlled KR learning benefits would be eliminated if an interpolated activity was performed during the KR-delay interval. Participants practiced a waveform matching task that required two rapid elbow extension-flexion reversals in one of four groups using a factorial combination of choice (self-controlled, yoked) and KR-delay interval (empty, interpolated). The waveform had specific spatial and temporal constraints, and an overall movement time goal. The results indicated that the self-controlled + empty group had superior retention and transfer scores compared to all other groups. Moreover, the self-controlled + interpolated and yoked + interpolated groups did not differ significantly in retention and transfer; thus, the interpolated activity eliminated the typically found learning benefits of self-controlled KR. No significant differences were found between the two yoked groups. We suggest the interpolated activity interfered with information-processing activities specific to self-controlled KR conditions that occur during the KR-delay interval and that these activities are vital for reaping the associated learning benefits. These findings add to the growing evidence that challenge the motivational account of self-controlled KR learning advantages and instead highlights informational factors associated with the KR-delay interval as an important variable for motor learning under self-controlled KR schedules.

  13. Evaluation of interactive computerized training to teach parents to implement photographic activity schedules with children with autism spectrum disorder.

    PubMed

    Gerencser, Kristina R; Higbee, Thomas S; Akers, Jessica S; Contreras, Bethany P

    2017-07-01

    Training parents of children with autism spectrum disorder can be a challenge due to limited resources, time, and money. Interactive computerized training (ICT)-a self-paced program that incorporates instructions, videos, and interactive questions-is one method professionals can use to disseminate trainings to broader populations. This study extends previous research on ICT by assessing the effect of ICT to teach three parents how to implement a photographic activity schedule using a systematic prompting procedure with their child. Following ICT, all parents increased their fidelity to implementation of an activity schedule during role-play sessions with an adult. Fidelity remained high during implementation with their child and maintained during a 2-week follow-up. © 2017 Society for the Experimental Analysis of Behavior.

  14. Fractional Programming for Communication Systems—Part II: Uplink Scheduling via Matching

    NASA Astrophysics Data System (ADS)

    Shen, Kaiming; Yu, Wei

    2018-05-01

    This two-part paper develops novel methodologies for using fractional programming (FP) techniques to design and optimize communication systems. Part I of this paper proposes a new quadratic transform for FP and treats its application for continuous optimization problems. In this Part II of the paper, we study discrete problems, such as those involving user scheduling, which are considerably more difficult to solve. Unlike the continuous problems, discrete or mixed discrete-continuous problems normally cannot be recast as convex problems. In contrast to the common heuristic of relaxing the discrete variables, this work reformulates the original problem in an FP form amenable to distributed combinatorial optimization. The paper illustrates this methodology by tackling the important and challenging problem of uplink coordinated multi-cell user scheduling in wireless cellular systems. Uplink scheduling is more challenging than downlink scheduling, because uplink user scheduling decisions significantly affect the interference pattern in nearby cells. Further, the discrete scheduling variable needs to be optimized jointly with continuous variables such as transmit power levels and beamformers. The main idea of the proposed FP approach is to decouple the interaction among the interfering links, thereby permitting a distributed and joint optimization of the discrete and continuous variables with provable convergence. The paper shows that the well-known weighted minimum mean-square-error (WMMSE) algorithm can also be derived from a particular use of FP; but our proposed FP-based method significantly outperforms WMMSE when discrete user scheduling variables are involved, both in term of run-time efficiency and optimizing results.

  15. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... structural measures; (8) Requests for LOMRs and PMRs based on as-built information for projects for which...) Requests for CLOMRs based on projects involving levees, berms, or other structural measures. (d) If a... PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on structural...

  16. The Over-Scheduling Hypothesis Revisited: Intensity of Organized Activity Participation during Adolescence and Young Adult Outcomes

    ERIC Educational Resources Information Center

    Mahoney, Joseph L.; Vest, Andrea E.

    2012-01-01

    Concern exists that youth who spend a lot of time participating in organized out-of-school activities (e.g., sports) are at-risk for poor developmental outcomes. This concern--called the over-scheduling hypothesis--has primarily been assessed in terms of adolescent adjustment. This longitudinal study of a nationally representative sample of 1,115…

  17. A computerized resolution of scheduling conflicts.

    PubMed

    Bolinger, R E; McFarlane, M J

    1989-01-01

    Residency training programs in Internal Medicine require resident attendance in a continuity clinic. This inevitably engenders conflicts between scheduling in the ambulatory clinic and the required teaching activities of the in-patient services. Some of the conflicts can be resolved by allowing the in-patient service directors to indicate preferred plans for their residents to attend in the continuity clinic. With this plan, scheduling becomes quite complicated. A computer program is presented with coordinates these service requests with ambulatory clinic scheduling. As a result, a given resident may have his/her clinic day changed on different rotations. The program automatically arbitrates conflicts and publishes the attendance dates for the entire academic year. This information is supplied to the appointment desk so that patients can be scheduled accordingly. This system has resulted in a 74% continuity rate and improved satisfaction by both residents and staff.

  18. Extracurricular participation and academic outcomes: testing the over-scheduling hypothesis.

    PubMed

    Fredricks, Jennifer A

    2012-03-01

    There is a growing concern that some youth are overscheduled in extracurricular activities, and that this increasing involvement has negative consequences for youth functioning. This article used data from the Educational Longitudinal Study (ELS: 2002), a nationally representative and ethnically diverse longitudinal sample of American high school students, to evaluate this hypothesis (N = 13,130; 50.4% female). On average, 10th graders participated in between 2 and 3 extracurricular activities, for an average of 5 h per week. Only a small percentage of 10th graders reported participating in extracurricular activities at high levels. Moreover, a large percentage of the sample reported no involvement in school-based extracurricular contexts in the after-school hours. Controlling for some demographic factors, prior achievement, and school size, the breadth (i.e., number of extracurricular activities) and the intensity (i.e., time in extracurricular activities) of participation at 10th grade were positively associated with math achievement test scores, grades, and educational expectations at 12th grade. Breadth and intensity of participation at 10th grade also predicted educational status at 2 years post high school. In addition, the non-linear function was significant. At higher breadth and intensity, the academic adjustment of youth declined. Implications of the findings for the over-scheduling hypothesis are discussed.

  19. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... 1120S, Schedule D, Schedule K-1, and Schedule M-3 AGENCY: Internal Revenue Service (IRS), Treasury... (Loss) Reconciliation for S Corporations With Total Assets of $10 Million or More, and Schedule K-1... Corporation, Schedule D (Form 1120S), Capital Gains and Losses and Built-in Gains, Schedule K-1 (Form 1120S...

  20. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  1. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  2. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  3. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  4. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  5. Variable Scheduling to Mitigate Channel Losses in Energy-Efficient Body Area Networks

    PubMed Central

    Tselishchev, Yuriy; Boulis, Athanassios; Libman, Lavy

    2012-01-01

    We consider a typical body area network (BAN) setting in which sensor nodes send data to a common hub regularly on a TDMA basis, as defined by the emerging IEEE 802.15.6 BAN standard. To reduce transmission losses caused by the highly dynamic nature of the wireless channel around the human body, we explore variable TDMA scheduling techniques that allow the order of transmissions within each TDMA round to be decided on the fly, rather than being fixed in advance. Using a simple Markov model of the wireless links, we devise a number of scheduling algorithms that can be performed by the hub, which aim to maximize the expected number of successful transmissions in a TDMA round, and thereby significantly reduce transmission losses as compared with a static TDMA schedule. Importantly, these algorithms do not require a priori knowledge of the statistical properties of the wireless channels, and the reliability improvement is achieved entirely via shuffling the order of transmissions among devices, and does not involve any additional energy consumption (e.g., retransmissions). We evaluate these algorithms directly on an experimental set of traces obtained from devices strapped to human subjects performing regular daily activities, and confirm that the benefits of the proposed variable scheduling algorithms extend to this practical setup as well. PMID:23202183

  6. Empirical results on scheduling and dynamic backtracking

    NASA Technical Reports Server (NTRS)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  7. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  8. Teaching Community Skills to Two Young Children with Autism Using a Digital Self-Managed Activity Schedule

    ERIC Educational Resources Information Center

    Cheung, Yvonne; Schulze, Kimberly A.; Leaf, Justin B.; Rudrud, Eric

    2016-01-01

    The current study investigated the efficacy of a self-managed activity schedule to teach 2 participants how to effectively order food items from a local community bakery. 2 participants who were on the autism spectrum were taught to follow a task analysis that was displayed on an iPhone. We used a multiple baseline design across participants to…

  9. Planning for the Intensively Scheduled Class.

    ERIC Educational Resources Information Center

    Hertz, Vivienne

    How does the college faculty member involved in off-campus teaching plan for intensively scheduled classes comprised of forty hours of instruction in three weekends? Two main areas of concern are (1) the differences between these students and those found on the main campus and (2) methods of providing variety in instruction to maintain a…

  10. Scheduling Results for the THEMIS Observation Scheduling Tool

    NASA Technical Reports Server (NTRS)

    Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip

    2011-01-01

    We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

  11. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  12. Scheduling Policies for an Antiterrorist Surveillance System

    DTIC Science & Technology

    2008-06-27

    times; for example, see Reiman and Wein [17] and Olsen [15]. For real-time scheduling problems involving impatient customers, see Gaver et al. [2...heavy traffic with throughput time constraints: Asymptotically optimal dynamic controls. Queueing Systems 39, 23–54. 30 [17] Reiman , M. I. and Wein

  13. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  14. FASTER - A tool for DSN forecasting and scheduling

    NASA Technical Reports Server (NTRS)

    Werntz, David; Loyola, Steven; Zendejas, Silvino

    1993-01-01

    FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

  15. Interference Cognizant Network Scheduling

    NASA Technical Reports Server (NTRS)

    Hall, Brendan (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor); Varadarajan, Srivatsan (Inventor); Smithgall, William Todd (Inventor)

    2017-01-01

    Systems and methods for interference cognizant network scheduling are provided. In certain embodiments, a method of scheduling communications in a network comprises identifying a bin of a global timeline for scheduling an unscheduled virtual link, wherein a bin is a segment of the timeline; identifying a pre-scheduled virtual link in the bin; and determining if the pre-scheduled and unscheduled virtual links share a port. In certain embodiments, if the unscheduled and pre-scheduled virtual links don't share a port, scheduling transmission of the unscheduled virtual link to overlap with the scheduled transmission of the pre-scheduled virtual link; and if the unscheduled and pre-scheduled virtual links share a port: determining a start time delay for the unscheduled virtual link based on the port; and scheduling transmission of the unscheduled virtual link in the bin based on the start time delay to overlap part of the scheduled transmission of the pre-scheduled virtual link.

  16. Scheduling multirobot operations in manufacturing by truncated Petri nets

    NASA Astrophysics Data System (ADS)

    Chen, Qin; Luh, J. Y.

    1995-08-01

    Scheduling of operational sequences in manufacturing processes is one of the important problems in automation. Methods of applying Petri nets to model and analyze the problem with constraints on precedence relations, multiple resources allocation, etc. have been available in literature. Searching for an optimum schedule can be implemented by combining the branch-and-bound technique with the execution of the timed Petri net. The process usually produces a large Petri net which is practically not manageable. This disadvantage, however, can be handled by a truncation technique which divides the original large Petri net into several smaller size subnets. The complexity involved in the analysis of each subnet individually is greatly reduced. However, when the locally optimum schedules of the resulting subnets are combined together, it may not yield an overall optimum schedule for the original Petri net. To circumvent this problem, algorithms are developed based on the concepts of Petri net execution and modified branch-and-bound process. The developed technique is applied to a multi-robot task scheduling problem of the manufacturing work cell.

  17. Particle swarm optimization based space debris surveillance network scheduling

    NASA Astrophysics Data System (ADS)

    Jiang, Hai; Liu, Jing; Cheng, Hao-Wen; Zhang, Yao

    2017-02-01

    The increasing number of space debris has created an orbital debris environment that poses increasing impact risks to existing space systems and human space flights. For the safety of in-orbit spacecrafts, we should optimally schedule surveillance tasks for the existing facilities to allocate resources in a manner that most significantly improves the ability to predict and detect events involving affected spacecrafts. This paper analyzes two criteria that mainly affect the performance of a scheduling scheme and introduces an artificial intelligence algorithm into the scheduling of tasks of the space debris surveillance network. A new scheduling algorithm based on the particle swarm optimization algorithm is proposed, which can be implemented in two different ways: individual optimization and joint optimization. Numerical experiments with multiple facilities and objects are conducted based on the proposed algorithm, and simulation results have demonstrated the effectiveness of the proposed algorithm.

  18. Predit: A temporal predictive framework for scheduling systems

    NASA Technical Reports Server (NTRS)

    Paolucci, E.; Patriarca, E.; Sem, M.; Gini, G.

    1992-01-01

    Scheduling can be formalized as a Constraint Satisfaction Problem (CSP). Within this framework activities belonging to a plan are interconnected via temporal constraints that account for slack among them. Temporal representation must include methods for constraints propagation and provide a logic for symbolic and numerical deductions. In this paper we describe a support framework for opportunistic reasoning in constraint directed scheduling. In order to focus the attention of an incremental scheduler on critical problem aspects, some discrete temporal indexes are presented. They are also useful for the prediction of the degree of resources contention. The predictive method expressed through our indexes can be seen as a Knowledge Source for an opportunistic scheduler with a blackboard architecture.

  19. 45 CFR 1177.4 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Claims involving criminal activity or misconduct. 1177.4 Section 1177.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL... Claims involving criminal activity or misconduct. (a) A debtor whose indebtedness involves criminal...

  20. 45 CFR 1177.4 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Claims involving criminal activity or misconduct. 1177.4 Section 1177.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL... Claims involving criminal activity or misconduct. (a) A debtor whose indebtedness involves criminal...

  1. 45 CFR 1177.4 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Claims involving criminal activity or misconduct. 1177.4 Section 1177.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL... Claims involving criminal activity or misconduct. (a) A debtor whose indebtedness involves criminal...

  2. 45 CFR 1177.4 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Claims involving criminal activity or misconduct. 1177.4 Section 1177.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL... Claims involving criminal activity or misconduct. (a) A debtor whose indebtedness involves criminal...

  3. 45 CFR 1177.4 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Claims involving criminal activity or misconduct. 1177.4 Section 1177.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL... Claims involving criminal activity or misconduct. (a) A debtor whose indebtedness involves criminal...

  4. A customizable, scalable scheduling and reporting system.

    PubMed

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  5. APGEN Scheduling: 15 Years of Experience in Planning Automation

    NASA Technical Reports Server (NTRS)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  6. Incremental Scheduling Engines for Human Exploration of the Cosmos

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  7. 48 CFR 3452.224-72 - Research activities involving human subjects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... involving human subjects. 3452.224-72 Section 3452.224-72 Federal Acquisition Regulations System DEPARTMENT... Text of Provisions and Clauses 3452.224-72 Research activities involving human subjects. As prescribed... human subjects covered under 34 CFR part 97: Research Activities Involving Human Subjects (MAR 2011) (a...

  8. 48 CFR 3452.224-72 - Research activities involving human subjects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... involving human subjects. 3452.224-72 Section 3452.224-72 Federal Acquisition Regulations System DEPARTMENT... Text of Provisions and Clauses 3452.224-72 Research activities involving human subjects. As prescribed... human subjects covered under 34 CFR part 97: Research Activities Involving Human Subjects (MAR 2011) (a...

  9. 48 CFR 3452.224-72 - Research activities involving human subjects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... involving human subjects. 3452.224-72 Section 3452.224-72 Federal Acquisition Regulations System DEPARTMENT... Text of Provisions and Clauses 3452.224-72 Research activities involving human subjects. As prescribed... human subjects covered under 34 CFR part 97: Research Activities Involving Human Subjects (MAR 2011) (a...

  10. 48 CFR 3452.224-72 - Research activities involving human subjects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... involving human subjects. 3452.224-72 Section 3452.224-72 Federal Acquisition Regulations System DEPARTMENT... Text of Provisions and Clauses 3452.224-72 Research activities involving human subjects. As prescribed... human subjects covered under 34 CFR part 97: Research Activities Involving Human Subjects (MAR 2011) (a...

  11. An Analysis of Shuttle Crew Scheduling Violations

    NASA Technical Reports Server (NTRS)

    Bristol, Douglas

    2012-01-01

    From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.

  12. Exploring Extension Involvement in Farm to School Program Activities

    ERIC Educational Resources Information Center

    Benson, Matthew C.

    2014-01-01

    The study reported here examined Extension professionals' involvement in farm-to-school program activities. Results of an online survey distributed to eight state Extension systems indicate that on average, Extension professionals are involved with one farm to school program activity, with most supporting school or community garden programs.…

  13. Scheduling for Public Service in International Operations

    NASA Technical Reports Server (NTRS)

    Brenner, M. A.

    1972-01-01

    The factors involved in scheduling airline services for international operations are discussed. Charts are presented to show the transatlantic pattern of flights for a typical airline during the summer and winter months. The operations of a domestic airline operating overseas and a foreign airline operating to the United States are compared.

  14. Synchronization of Leisure Conflicts in the Family Schedule.

    ERIC Educational Resources Information Center

    Kelly, John R.

    The model of the family as a set of contingent careers is brought into focus by Wilbert Moore's suggestions that in schedule synchronization the family takes priority in claiming time, the wife-mother asserts such claims and arranges the schedule, and common leisure activities symbolize the solidarity of the unit. The perception of parents of the…

  15. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE... defense reasons in accordance with paragraph E.2.a(1) of DoD Instruction 4100.33, other than CAs reported...

  16. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE... defense reasons in accordance with paragraph E.2.a(1) of DoD Instruction 4100.33, other than CAs reported...

  17. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE... defense reasons in accordance with paragraph E.2.a(1) of DoD Instruction 4100.33, other than CAs reported...

  18. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Commercial Activities Inventory Report and Five-Year Review Schedule B Appendix B to Part 169a National Defense Department of Defense OFFICE OF THE... defense reasons in accordance with paragraph E.2.a(1) of DoD Instruction 4100.33, other than CAs reported...

  19. The GBT Dynamic Scheduling System: A New Scheduling Paradigm

    NASA Astrophysics Data System (ADS)

    O'Neil, K.; Balser, D.; Bignell, C.; Clark, M.; Condon, J.; McCarty, M.; Marganian, P.; Shelton, A.; Braatz, J.; Harnett, J.; Maddalena, R.; Mello, M.; Sessoms, E.

    2009-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) is implementing a new Dynamic Scheduling System (DSS) designed to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and that the data quality of observations is not adversely affected. To accomplish this, the GBT DSS is implementing a dynamic scheduling system which schedules observers, rather than running scripts. The DSS works by breaking each project into one or more sessions which have associated observing criteria such as RA, Dec, and frequency. Potential observers may also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses those data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (< 20%) case where the actual weather does not match the predictions, a backup project, chosen from the database, is run instead. Here we give an overview of the GBT DSS project, including the ranking and scheduling algorithms for the sessions, the scheduling probabilities generation, the web framework for the system, and an overview of the results from the beta testing which were held from June - September, 2008.

  20. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

  1. CRI planning and scheduling for space

    NASA Technical Reports Server (NTRS)

    Aarup, Mads

    1994-01-01

    Computer Resources International (CRI) has many years of experience in developing space planning and scheduling systems for the European Space Agency. Activities range from AIT/AIV planning over mission planning to research in on-board autonomy using advanced planning and scheduling technologies in conjunction with model based diagnostics. This article presents four projects carried out for ESA by CRI with various subcontractors: (1) DI, Distributed Intelligence for Ground/Space Systems is an on-going research project; (2) GMPT, Generic Mission Planning Toolset, a feasibility study concluded in 1993; (3) OPTIMUM-AIV, Open Planning Tool for AIV, development of a knowledge based AIV planning and scheduling tool ended in 1992; and (4) PlanERS-1, development of an AI and knowledge-based mission planning prototype for the ERS-1 earth observation spacecraft ended in 1991.

  2. External Control of Knowledge of Results: Learner Involvement Enhances Motor Skill Transfer.

    PubMed

    Figueiredo, L S; Ugrinowitsch, H; Freire, A B; Shea, J B; Benda, R N

    2018-04-01

    Providing the learner control over aspects of practice has improved the process of motor skill acquisition, and self-controlled knowledge of results (KR) schedules have shown specific advantages over externally controlled ones. A possible explanation is that self-controlled KR schedules lead learners to more active task involvement, permitting deeper information processing. This study tested this explanatory hypothesis. Thirty undergraduate volunteers of both sexes, aged 18 to 35, all novices in the task, practiced transporting a tennis ball in a specified sequence within a time goal. We compared a high-involvement group (involvement yoked, IY), notified in advance about upcoming KR trials, to self-controlled KR (SC) and yoked KR (YK) groups. The experiment consisted of three phases: acquisition, retention, and transfer. We found both IY and SC groups to be superior to YK for transfer of learning. Postexperiment participant questionnaires confirmed a preference for receiving KR after learner-perceived good trials, even though performance on those trials did not differ from performance on trials without KR. Equivalent IY and SC performances provide support for the benefits of task involvement and deeper information processing when KR is self-controlled in motor skill acquisition.

  3. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  4. Operations research methods improve chemotherapy patient appointment scheduling.

    PubMed

    Santibáñez, Pablo; Aristizabal, Ruben; Puterman, Martin L; Chow, Vincent S; Huang, Wenhai; Kollmannsberger, Christian; Nordin, Travis; Runzer, Nancy; Tyldesley, Scott

    2012-12-01

    Clinical complexity, scheduling restrictions, and outdated manual booking processes resulted in frequent clerical rework, long waitlists for treatment, and late appointment notification for patients at a chemotherapy clinic in a large cancer center in British Columbia, Canada. A 17-month study was conducted to address booking, scheduling and workload issues and to develop, implement, and evaluate solutions. A review of scheduling practices included process observation and mapping, analysis of historical appointment data, creation of a new performance metric (final appointment notification lead time), and a baseline patient satisfaction survey. Process improvement involved discrete event simulation to evaluate alternative booking practice scenarios, development of an optimization-based scheduling tool to improve scheduling efficiency, and change management for implementation of process changes. Results were evaluated through analysis of appointment data, a follow-up patient survey, and staff surveys. Process review revealed a two-stage scheduling process. Long waitlists and late notification resulted from an inflexible first-stage process. The second-stage process was time consuming and tedious. After a revised, more flexible first-stage process and an automated second-stage process were implemented, the median percentage of appointments exceeding the final appointment notification lead time target of one week was reduced by 57% and median waitlist size decreased by 83%. Patient surveys confirmed increased satisfaction while staff feedback reported reduced stress levels. Significant operational improvements can be achieved through process redesign combined with operations research methods.

  5. Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.; Pathak, Dhiraj K.

    1991-01-01

    In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

  6. Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments

    PubMed Central

    Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361

  7. Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.

    PubMed

    Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.

  8. Optimizing donor scheduling before recruitment: An effective approach to increasing apheresis platelet collections.

    PubMed

    Lokhandwala, Parvez M; Shike, Hiroko; Wang, Ming; Domen, Ronald E; George, Melissa R

    2018-01-01

    Typical approach for increasing apheresis platelet collections is to recruit new donors. Here, we investigated the effectiveness of an alternative strategy: optimizing donor scheduling, prior to recruitment, at a hospital-based blood donor center. Analysis of collections, during the 89 consecutive months since opening of donor center, was performed. Linear regression and segmented time-series analyses were performed to calculate growth rates of collections and to test for statistical differences, respectively. Pre-intervention donor scheduling capacity was 39/month. In the absence of active donor recruitment, during the first 29 months, the number of collections rose gradually to 24/month (growth-rate of 0.70/month). However, between month-30 and -55, collections exhibited a plateau at 25.6 ± 3.0 (growth-rate of -0.09/month) (p<0.0001). This plateau-phase coincided with donor schedule approaching saturation (65.6 ± 7.6% schedule booked). Scheduling capacity was increased by following two interventions: adding an apheresis instrument (month-56) and adding two more collection days/week (month-72). Consequently, the scheduling capacity increased to 130/month. Post-interventions, apheresis platelet collections between month-56 and -81 exhibited a spontaneous renewed growth at a rate of 0.62/month (p<0.0001), in absence of active donor recruitment. Active donor recruitment in month-82 and -86, when the donor schedule had been optimized to accommodate further growth, resulted in a dramatic but transient surge in collections. Apheresis platelet collections plateau at nearly 2/3rd of the scheduling capacity. Optimizing the scheduling capacity prior to active donor recruitment is an effective strategy to increase platelet collections at a hospital-based donor center.

  9. United States Marine Corps 2012 Financial Report. Schedule of Budgetary Activity for Fiscal Year 2012 Appropriations

    DTIC Science & Technology

    2012-01-01

    activity schedule for current year appropriations that is also compliant with Generally Accepted Accounting Principles ( GAAP ). The audit of this financial...are not only fighters, but also who can serve as trainers, mentors and advisers. Marine Corps Value to the Nation For a remarkably small investment ...who are interested in and could use the information in the statements to help them make resource allocation and other decisions and hold the entity

  10. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  11. Schedules of controlled substances: temporary placement of three synthetic phenethylamines into Schedule I. Final order.

    PubMed

    2013-11-15

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic phenethylamines into the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are 2-(4-iodo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25I-NBOMe; 2C-I-NBOMe; 25I; Cimbi-5), 2-(4-chloro-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25C-NBOMe; 2C-C-NBOMe; 25C; Cimbi-82), and 2-(4-bromo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25B-NBOMe; 2C-B-NBOMe; 25B; Cimbi-36) [hereinafter 25I-NBOMe, 25C-NBOMe, and 25B-NBOMe]. This action is based on a finding by the Deputy Administrator that the placement of these synthetic phenethylamines and their optical, positional, and geometric isomers, salts and salts of isomers in schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities, and possess), or propose to handle these synthetic phenethylamines.

  12. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  13. Submarine watch schedules: underway evaluation of rotating (contemporary) and compressed (alternative) schedules.

    PubMed

    Duplessis, C A; Miller, J C; Crepeau, L J; Osborn, C M; Dyche, J

    2007-01-01

    With a desire to increase health, cognitive performance effectiveness, and quality of life for submarine watch-standers underway, we performed an evaluation comparing an alternative, compressed-work (ALT) schedule, designed to enhance circadian rhythm entrainment and sleep hygiene, to the contemporary submarine (SUB) forward rotating schedule, aboard the ballistic-missile submarine, USS Henry M. Jackson (SSBN-730 Gold). We assessed a compressed close-6 watch-schedule ("ALT") relative to the existing backward rotating 6-hr on, 12-hr off 18-hr watch schedule ("SUB") employed underway aboard submarines. We monitored 40 subjects' sleep, and temperature and salivary cortisol from 10 of the 40 for approximately two weeks on each respective schedule underway. The cortisol cosinor mesors (midline estimating statistic of rhythm), and amplitudes did not differ significantly between conditions. The temperature cosinor mesors, and the cosinor amplitude were not significantly different, while the cosine curve fit accounted for significantly more variance in the ALT condition than in the SUB condition. The SUB schedule garnered significantly more sleep (7.1 +/- 0.2 hours) than that of the ALTMID schedule (6.3 +/- 0.3 hours). Surveys revealed that 52% of respondents preferred the SUB schedule, 15% preferred the ALT, and 33% were either indifferent or submitted uninterpretable surveys. The ALT schedule was not superior to the existing SUB schedule by physiological or subjective measures and was incompatible to accommodating operational constraints.

  14. Web Publishing Schedule

    EPA Pesticide Factsheets

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  15. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  16. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  17. An Integrated Constraint Programming Approach to Scheduling Sports Leagues with Divisional and Round-robin Tournaments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.

  18. Turning lemonade into lemons: Dampening appraisals reduce positive affect and increase negative affect during positive activity scheduling.

    PubMed

    Burr, Leigh-Anne; Javiad, Mahmood; Jell, Grace; Werner-Seidler, Aliza; Dunn, Barnaby D

    2017-04-01

    The way individuals appraise positive emotions may modulate affective experience during positive activity scheduling. Individuals may either engage in dampening appraisals (e.g., think "this is too good to last") or amplifying appraisals (e.g., think "I deserve this"). A cross-over randomized design was used to examine the consequences of these appraisal styles. Participants (N = 43) rated positive affect (PA) and negative affect (NA) during four daily walks in pleasant locations, whilst following dampening, emotion-focus amplifying (focusing on how good one feels), self-focus amplifying (focusing on positive self qualities), or control instructions. There was no difference between the two amplifying and control conditions, which all increased PA and reduced NA during the walks. However, the dampening condition significantly differed from all other conditions, reducing PA and increasing NA during the walk. Individual differences in anhedonia symptoms did not significantly moderate the pattern of findings. This evidence supports the view that dampening appraisals may be one mechanism driving anhedonia and may account for why positive activity scheduling can sometimes backfire when utilized in the clinic. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. A treatment comparison study of a photo activity schedule and Social Stories for teaching social skills to children with Autism Spectrum Disorder: brief report.

    PubMed

    Daneshvar, Sabrina D; Charlop, Marjorie H; Berry Malmberg, Debra

    2018-05-21

    To compare the efficacy of two procedures, a photo activity schedule intervention and Social Stories, to teach social skills to four children diagnosed with Autism Spectrum Disorder (ASD). An adapted alternating treatments design with an additional multiple baseline control was used, and two social skills were targeted for each of the four participants, one under each intervention condition. Results indicated that all four participants learned the target social behaviours with the photo activity schedule intervention, but did not learn target social behaviours with Social Stories. Findings support the use of a photo activity intervention for teaching social skillsto children with ASD; we discuss the implications of inconsistent findings of effectiveness of Social Stories.

  20. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  1. Physical Activity and Sedentary Time among Young Children in Full-Day Kindergarten: Comparing Traditional and Balanced Day Schedules

    ERIC Educational Resources Information Center

    Vanderloo, Leigh M.; Tucker, Patricia

    2017-01-01

    Objective: To compare physical activity and sedentary time among young children whose schools adhere to traditional (i.e. three outdoor playtimes = 70 minutes) versus balanced day (i.e. two outdoor playtimes = ~55 minutes) schedules in Ontario full-day kindergarten classrooms. Design: The project was part of a larger, 2-year cross-sectional study.…

  2. 77 FR 75145 - Impact of the Implementation of the Chemical Weapons Convention (CWC) on Commercial Activities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... the Implementation of the Chemical Weapons Convention (CWC) on Commercial Activities Involving ``Schedule 1'' Chemicals (Including Schedule 1 Chemicals Produced as Intermediates) Through Calendar Year... Chemical Weapons Convention (CWC), through the Chemical Weapons Convention Implementation Act (CWCIA) and...

  3. 5 CFR 1215.24 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Claims involving criminal activity or misconduct. 1215.24 Section 1215.24 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION AND PROCEDURES DEBT MANAGEMENT Claims Collection § 1215.24 Claims involving criminal activity or misconduct. (a...

  4. 5 CFR 1215.24 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Claims involving criminal activity or misconduct. 1215.24 Section 1215.24 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION AND PROCEDURES DEBT MANAGEMENT Claims Collection § 1215.24 Claims involving criminal activity or misconduct. (a...

  5. 5 CFR 1215.24 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 3 2012-01-01 2012-01-01 false Claims involving criminal activity or misconduct. 1215.24 Section 1215.24 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION AND PROCEDURES DEBT MANAGEMENT Claims Collection § 1215.24 Claims involving criminal activity or misconduct. (a...

  6. 5 CFR 1215.24 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Claims involving criminal activity or misconduct. 1215.24 Section 1215.24 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION AND PROCEDURES DEBT MANAGEMENT Claims Collection § 1215.24 Claims involving criminal activity or misconduct. (a...

  7. 5 CFR 1215.24 - Claims involving criminal activity or misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 3 2014-01-01 2014-01-01 false Claims involving criminal activity or misconduct. 1215.24 Section 1215.24 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD ORGANIZATION AND PROCEDURES DEBT MANAGEMENT Claims Collection § 1215.24 Claims involving criminal activity or misconduct. (a...

  8. Parasites modulate within-colony activity and accelerate the temporal polyethism schedule of a social insect, the honey bee.

    PubMed

    Natsopoulou, Myrsini E; McMahon, Dino P; Paxton, Robert J

    Task allocation in social insect colonies is generally organised into an age-related division of labour, termed the temporal polyethism schedule, which may in part have evolved to reduce infection of the colony's brood by pests and pathogens. The temporal polyethism schedule is sensitive to colony perturbations that may lead to adaptive changes in task allocation, maintaining colony homeostasis. Though social insects can be infected by a range of parasites, little is known of how these parasites impact within-colony behaviour and the temporal polyethism schedule. We use honey bees ( Apis mellifera ) experimentally infected by two of their emerging pathogens, Deformed wing virus (DWV), which is relatively understudied concerning its behavioural impact on its host, and the exotic microsporidian Nosema ceranae . We examined parasite effects on host temporal polyethism and patterns of activity within the colony. We found that pathogens accelerated the temporal polyethism schedule, but without reducing host behavioural repertoire. Infected hosts exhibited increased hyperactivity, allocating more time to self-grooming and foraging-related tasks. The strength of behavioural alterations we observed was found to be pathogen specific; behavioural modifications were more pronounced in virus-treated hosts versus N. ceranae -treated hosts, with potential benefits for the colony in terms of reducing within-colony transmission. Investigating the effects of multiple pathogens on behavioural patterns of social insects could play a crucial role in understanding pathogen spread within a colony and their effects on colony social organisation.

  9. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  10. Program Scheduling Handbook.

    DTIC Science & Technology

    1980-03-01

    account the outcome of any other task. Each activity must be estimated as a stand-alone entity from the network (statistical indep ndence). The... stress the term program as miiore in dUsive than contract in the WBS and Master Schedule. In this chapter we will present one very usable approach to...questions, not raise them. Use different colored cards to represent the SPO, the contractior, procurement, and any other agency that play, a major role in the

  11. Scheduled Daily Mating Induces Circadian Anticipatory Activity Rhythms in the Male Rat

    PubMed Central

    Landry, Glenn J.; Opiol, Hanna; Marchant, Elliott G.; Pavlovski, Ilya; Mear, Rhiannon J.; Hamson, Dwayne K.; Mistlberger, Ralph E.

    2012-01-01

    Daily schedules of limited access to food, palatable high calorie snacks, water and salt can induce circadian rhythms of anticipatory locomotor activity in rats and mice. All of these stimuli are rewarding, but whether anticipation can be induced by neural correlates of reward independent of metabolic perturbations associated with manipulations of food and hydration is unclear. Three experiments were conducted to determine whether mating, a non-ingestive behavior that is potently rewarding, can induce circadian anticipatory activity rhythms in male rats provided scheduled daily access to steroid-primed estrous female rats. In Experiment 1, rats anticipated access to estrous females in the mid-light period, but also exhibited post-coital eating and running. In Experiment 2, post-coital eating and running were prevented and only a minority of rats exhibited anticipation. Rats allowed to see and smell estrous females showed no anticipation. In both experiments, all rats exhibited sustained behavioral arousal and multiple mounts and intromissions during every session, but ejaculated only every 2–3 days. In Experiment 3, the rats were given more time with individual females, late at night for 28 days, and then in the midday for 28 days. Ejaculation rates increased and anticipation was robust to night sessions and significant although weaker to day sessions. The anticipation rhythm persisted during 3 days of constant dark without mating. During anticipation of nocturnal mating, the rats exhibited a significant preference for a tube to the mating cage over a tube to a locked cage with mating cage litter. This apparent place preference was absent during anticipation of midday mating, which may reflect a daily rhythm of sexual reward. The results establish mating as a reward stimulus capable of inducing circadian rhythms of anticipatory behavior in the male rat, and reveal a critical role for ejaculation, a modulatory role for time of day, and a potential confound role

  12. Alternative scheduling models and their effect on science achievement at the high school level

    NASA Astrophysics Data System (ADS)

    Dostal, Jay Roland

    This study will evaluate alternative scheduling methods implemented in secondary level schools. Students were selected based on parent selection of programs. Traditional scheduling involves numerous academic subjects with small increments of time in each class and block scheduling focuses on fewer academic subjects and more instructional time. This study will compare office referral numbers, absence frequency, and Essential Learner Outcome (ELO) science strand scores in the 8th-grade (pretest) to the same students office referrals, absence frequency, and ELO science strand scores in the 11th-grade (posttest) between Seven Period Traditional Scheduling (SPTS) and Four Period Block Scheduling (FPBS) in the hopes that no matter what schedule students are a part of, the achievement results will be similar. (Study participants had completed both grade level ELO assessments and were continuously enrolled in one high school through their junior year.

  13. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  14. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  15. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  16. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  17. A case study: the initiative to improve RN scheduling at Hamilton Health Sciences.

    PubMed

    Wallace, Laurel-Anne; Pierson, Sharon

    2008-01-01

    In 2003, Hamilton Health Sciences embarked on an initiative to improve and standardize nursing schedules and scheduling practices. The scheduling project was one of several initiatives undertaken by a corporate-wide Nursing Resource Group established to enhance the work environment and patient care and to ensure appropriate utilization of nursing resources across the organization's five hospitals. This article focuses on major activities undertaken in the scheduling initiative. The step-by-step approach described, plus examples of the scheduling resources developed and samples of extended-tour schedules, will all provide insight, potential strategies and practical help for nursing administrators, human resources (HR) personnel and others interested in improving nurse scheduling.

  18. Single-Pass Serial Scheduling Heuristic for Eglin AFB Range Services Division Schedule

    DTIC Science & Technology

    2009-06-01

    scheduling tool for this RCPSP. Research on a schedule improvement metaheuristic and coding of the complete algorithm is required before it can be...a schedule better by applying metaheuristic improvement algorithms to a feasible schedule after it is created. 2.5.1. Greedy Algorithm The...next available position, the algorithm will not utilize all the available range time and manpower. An improvement metaheuristic is required to

  19. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  20. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  1. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    PubMed Central

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414

  2. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  3. Automating Deep Space Network scheduling and conflict resolution

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Clement, Bradley

    2005-01-01

    The Deep Space Network (DSN) is a central part of NASA's infrastructure for communicating with active space missions, from earth orbit to beyond the solar system. We describe our recent work in modeling the complexities of user requirements, and then scheduling and resolving conflicts on that basis. We emphasize our innovative use of background 'intelligent' assistants' that carry out search asynchrnously while the user is focusing on various aspects of the schedule.

  4. Request-Driven Schedule Automation for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  5. Research on the ITOC based scheduling system for ship piping production

    NASA Astrophysics Data System (ADS)

    Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro

    2010-12-01

    Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.

  6. Schedules of Controlled Substances: Placement of Three Synthetic Phenethylamines Into Schedule I. Final rule.

    PubMed

    2016-09-27

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration places three synthetic phenethylamines: 2-(4-iodo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25I-NBOMe; 2C-I-NBOMe; 25I; Cimbi-5), 2-(4-chloro-2,5-dimethoxyphenyl)-N- (2-methoxybenzyl)ethanamine (25C-NBOMe; 2C-C-NBOMe; 25C; Cimbi-82), and 2-(4-bromo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25B- NBOMe; 2C-B-NBOMe; 25B; Cimbi-36), including their optical, positional, and geometric isomers, salts and salts of isomers, whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule I of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action continues the application of the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle 25I-NBOMe, 25C-NBOMe, or 25B-NBOMe.

  7. Nonstandard Work Schedules, Family Dynamics, and Mother-Child Interactions During Early Childhood.

    PubMed

    Prickett, Kate C

    2018-03-01

    The rising number of parents who work nonstandard schedules has led to a growing body of research concerned with what this trend means for children. The negative outcomes for children of parents who work nonstandard schedules are thought to arise from the disruptions these schedules place on family life, and thus, the types of parenting that support their children's development, particularly when children are young. Using a nationally representative sample of two-parent families (Early Childhood Longitudinal Study-Birth cohort, n = 3,650), this study examined whether mothers' and their partners' nonstandard work schedules were associated with mothers' parenting when children were 2 and 4 years old. Structural equation models revealed that mothers' and their partners' nonstandard work schedules were associated with mothers' lower scores on measures of positive and involved parenting. These associations were mediated by fathers' lower levels of participation in cognitively supportive parenting and greater imbalance in cognitively supportive tasks conducted by mothers versus fathers.

  8. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  9. Effects of restricted feeding schedules on circadian organization in squirrel monkeys

    NASA Technical Reports Server (NTRS)

    Boulos, Z.; Frim, D. M.; Dewey, L. K.; Moore-Ede, M. C.

    1989-01-01

    Free running circadian rhythms of motor activity, food-motivated lever-pressing, and either drinking (N = 7) or body temperature (N = 3) were recorded from 10 squirrel monkeys maintained in constant illumination with unlimited access to food. Food availability was then restricted to a single unsignaled 3-hour interval each day. The feeding schedule failed to entrain the activity rhythms of 8 monkeys, which continued to free-run. Drinking was almost completely synchronized by the schedule, while body temperature showed a feeding-induced rise superimposed on a free-running rhythm. Nonreinforced lever-pressing showed both a free-running component and a 24-hour component that anticipated the time of feeding. At the termination of the schedule, all recorded variables showed free-running rhythms, but in 3 animals the initial phase of the postschedule rhythms was advanced by several hours, suggesting relative coordination. Of the remaining 2 animals, one exhibited stable entrainment of all 3 recorded rhythms, while the other appeared to entrain temporarily to the feeding schedule. These results indicate that restricted feeding schedules are only a weak zeitgeber for the circadian pacemaker generating free-running rhythms in the squirrel monkey. Such schedules, however, may entrain a separate circadian system responsible for the timing of food-anticipatory changes in behavior and physiology.

  10. Scheduling reinforcement about once a day.

    PubMed

    Eckerman, D A

    1999-04-01

    A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.

  11. Organized Activity Involvement among Urban Youth: Understanding Family- and Neighborhood- Level Characteristics as Predictors of Involvement.

    PubMed

    Anderson, Nicole A; Bohnert, Amy M; Governale, Amy

    2018-02-22

    Research examining factors that predict youth's involvement in organized activities is very limited, despite associations with positive outcomes. Using data from 1043 youth (49% female; 46.4% Hispanic, 35.4% African American, 14.0% Caucasian, and 4.2% other) from the Project on Human Development in Chicago Neighborhoods, this study examined how characteristics of parents (supervision, warmth) and neighborhoods (perceived neighborhood safety and collective efficacy) predict patterns of adolescents' involvement in organized activities concurrently (i.e., intensity) and longitudinally (i.e., type and breadth). Parental supervision predicted adolescents' participation in organized activities across multiple waves. Neighborhood violence was positively associated with concurrent participation in organized activities after controlling for socioeconomic status (SES), whereas higher neighborhood collective efficacy predicted greater breadth in organized activity participation across time. These findings have important implications regarding how to attract and sustain organized activity participation for low-income, urban youth.

  12. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  13. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  14. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  15. An analysis of the impact of three high school schedules on student achievement in advanced placement biology classes

    NASA Astrophysics Data System (ADS)

    Arons-Polan, Bonnie

    This study examined the effect of three schedule types on student achievement in Advanced Placement Biology classes. AP Biology test scores from students on three types of full-year schedules were analyzed to assess the impact schedule type had on student achievement. The three schedules included the block and traditional schedules, and the rotating/hybrid, a blend of the former two schedules. The results indicated the variable most closely associated with success on the AP Biology exam was the length of experience the teachers had teaching the course, regardless of schedule type. Although significant differences were seen in mean AP Biology test scores among the three schedule types, this could be explained by the relationship between instructors' experience and schedule type. Regression analysis determined the two strongest predictors of successful performance on the AP Biology exam were instructors' experience and perceived teaching style, regardless of schedule type. It appears that the economically developed suburbs, had teachers with the largest amount of experience teaching AP Biology, and these teachers reported using a direct approach to teaching, using lecture greater than 50% of the time. The results of this study also suggest when restructuring to improve student achievement, educators should examine other variables in addition to the high school schedule. Restructuring the day to allow for longer classes must be accompanied by professional staff development to allow teachers to develop new teaching methods. Most of the teachers in the survey reported using lecture a great deal of the time, regardless of schedule type. Comments from the teachers from the various schedules revealed that the ability to add student centered, inquiry based activities and labs were dependent on adequate class time. No information on whether or not the teachers were given professional development to expand their repertoire of teaching methods when the school adopted a block

  16. Self-management model in the scheduling of successive appointments in rheumatology.

    PubMed

    Castro Corredor, David; Cuadra Díaz, José Luis; Mateos Rodríguez, Javier José; Anino Fernández, Joaquín; Mínguez Sánchez, María Dolores; de Lara Simón, Isabel María; Tébar, María Ángeles; Añó, Encarnación; Sanz, María Dolores; Ballester, María Nieves

    2018-01-08

    The rheumatology service of Ciudad Real Hospital, located in an autonomous community of that same name that is nearly in the center of Spain, implemented a self-management model of successive appointments more than 10 years ago. Since then, the physicians of the department schedule follow-up visits for their patients depending on the disease, its course and ancillary tests. The purpose of this study is to evaluate and compare the self-management model for successive appointments in the rheumatology service of Ciudad Real Hospital versus the model of external appointment management implemented in 8 of the hospital's 15 medical services. A comparative and multivariate analysis was performed to identify variables with statistically significant differences, in terms of activity and/or performance indicators and quality perceived by users. The comparison involved the self-management model for successive appointments employed in the rheumatology service of Ciudad Real Hospital and the model for external appointment management used in 8 hospital medical services between January 1 and May 31, 2016. In a database with more than 100,000 records of appointments involving the set of services included in the study, the mean waiting time and the numbers of non-appearances and rescheduling of follow-up visits in the rheumatology department were significantly lower than in the other services. The number of individuals treated in outpatient rheumatology services was 7,768, and a total of 280 patients were surveyed (response rate 63.21%). They showed great overall satisfaction, and the incidence rate of claims was low. Our results show that the self-management model of scheduling appointments has better results in terms of activity indicators and in quality perceived by users, despite the intense activity. Thus, this study could be fundamental for decision making in the management of health care organizations. Copyright © 2017 Elsevier España, S.L.U. and Sociedad Española de

  17. 5 CFR 532.254 - Special schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....254 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.254 Special schedules. (a) A lead agency, with the approval... critical to the mission of a Federal activity based on findings that— (1) Unusual prevailing pay practices...

  18. Linear-parameter-varying gain-scheduled control of aerospace systems

    NASA Astrophysics Data System (ADS)

    Barker, Jeffrey Michael

    The dynamics of many aerospace systems vary significantly as a function of flight condition. Robust control provides methods of guaranteeing performance and stability goals across flight conditions. In mu-syntthesis, changes to the dynamical system are primarily treated as uncertainty. This method has been successfully applied to many control problems, and here is applied to flutter control. More recently, two techniques for generating robust gain-scheduled controller have been developed. Linear fractional transformation (LFT) gain-scheduled control is an extension of mu-synthesis in which the plant and controller are explicit functions of parameters measurable in real-time. This LFT gain-scheduled control technique is applied to the Benchmark Active Control Technology (BACT) wing, and compared with mu-synthesis control. Linear parameter-varying (LPV) gain-scheduled control is an extension of Hinfinity control to parameter varying systems. LPV gain-scheduled control directly incorporates bounds on the rate of change of the scheduling parameters, and often reduces conservatism inherent in LFT gain-scheduled control. Gain-scheduled LPV control of the BACT wing compares very favorably with the LFT controller. Gain-scheduled LPV controllers are generated for the lateral-directional and longitudinal axes of the Innovative Control Effectors (ICE) aircraft and implemented in nonlinear simulations and real-time piloted nonlinear simulations. Cooper-Harper and pilot-induced oscillation ratings were obtained for an initial design, a reference aircraft and a redesign. Piloted simulation results for the initial LPV gain-scheduled control of the ICE aircraft are compared with results for a conventional fighter aircraft in discrete pitch and roll angle tracking tasks. The results for the redesigned controller are significantly better than both the previous LPV controller and the conventional aircraft.

  19. Projecting Future Scheduled Airline Demand, Schedules and NGATS Benefits Using TSAM

    NASA Technical Reports Server (NTRS)

    Dollyhigh, Samuel; Smith, Jeremy; Viken, Jeff; Trani, Antonio; Baik, Hojong; Hinze, Nickolas; Ashiabor, Senanu

    2006-01-01

    The Transportation Systems Analysis Model (TSAM) developed by Virginia Tech s Air Transportation Systems Lab and NASA Langley can provide detailed analysis of the effects on the demand for air travel of a full range of NASA and FAA aviation projects. TSAM has been used to project the passenger demand for very light jet (VLJ) air taxi service, scheduled airline demand growth and future schedules, Next Generation Air Transportation System (NGATS) benefits, and future passenger revenues for the Airport and Airway Trust Fund. TSAM can project the resulting demand when new vehicles and/or technology is inserted into the long distance (100 or more miles one-way) transportation system, as well as, changes in demand as a result of fare yield increases or decreases, airport transit times, scheduled flight times, ticket taxes, reductions or increases in flight delays, and so on. TSAM models all long distance travel in the contiguous U.S. and determines the mode choice of the traveler based on detailed trip costs, travel time, schedule frequency, purpose of the trip (business or non-business), and household income level of the traveler. Demand is modeled at the county level, with an airport choice module providing up to three airports as part of the mode choice. Future enplanements at airports can be projected for different scenarios. A Fratar algorithm and a schedule generator are applied to generate future flight schedules. This paper presents the application of TSAM to modeling future scheduled air passenger demand and resulting airline schedules, the impact of NGATS goals and objectives on passenger demand, along with projections for passenger fee receipts for several scenarios for the FAA Airport and Airway Trust Fund.

  20. Extracurricular involvement among affluent youth: a scapegoat for "ubiquitous achievement pressures"?

    PubMed

    Luthar, Suniya S; Shoum, Karen A; Brown, Pamela J

    2006-05-01

    It has been suggested that over-scheduling of upper-class youth might underlie the high distress and substance use documented among them. This assumption was tested by considering suburban 8th graders' involvement in different activities along with their perceptions of parental attitudes toward achievement. Results indicated negligible evidence for deleterious effects of high extracurricular involvement per se. Far more strongly implicated was perceived parent criticism for both girls and boys as well as the absence of after-school supervision. Low parent expectations connoted significant vulnerability especially for boys. The findings indicate that at least among early adolescents, converging scientific and media reports may have scapegoated extracurricular involvements, to some degree, as an index of ubiquitous achievement pressures in affluent communities. ((c) 2006 APA, all rights reserved).

  1. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2007-01-01

    For all past and current human space missions, the final scheduling of tasks to be done in space has been devoid of crew control, flexibility, and insight. Ground controllers, with minimal input from the crew, schedule the tasks and uplink the timeline to the crew or uplink the command sequences to the hardware. Prior to the International Space Station (ISS), the crew could make requests about tomorrow s timeline, they could omit a task, or they could request that something in the timeline be delayed. This lack of control over one's own schedule has had negative consequences. There is anecdotal consensus among astronauts that control over their own schedules will mitigate the stresses of long duration missions. On ISS, a modicum of crew control is provided by the job jar. Ground controllers prepare a task list (a.k.a. "job jar") of non-conflicting tasks from which jobs can be chosen by the in space crew. Because there is little free time and few interesting non-conflicting activities, the task-list approach provides little relief from the tedium of being micro-managed by the timeline. Scheduling for space missions is a complex and laborious undertaking which usually requires a large cadre of trained specialists and suites of complex software tools. It is a giant leap from today s ground prepared timeline (with a job jar) to full crew control of the timeline. However, technological advances, currently in-work or proposed, make it reasonable to consider scheduling a collaborative effort by the ground-based teams and the in-space crew. Collaboration would allow the crew to make minor adjustments, add tasks according to their preferences, understand the reasons for the placement of tasks on the timeline, and provide them a sense of control. In foreseeable but extraordinary situations, such as a quick response to anomalies and extended or unexpected loss of signal, the crew should have the autonomous ability to make appropriate modifications to the timeline, extend the

  2. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    PubMed

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  3. Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

    NASA Technical Reports Server (NTRS)

    Happell, Nadine; Moe, Karen L.; Minnix, Jay

    1993-01-01

    NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

  4. Instructional versus schedule control of humans' choices in situations of diminishing returns

    PubMed Central

    Hackenberg, Timothy D.; Joker, Veronica R.

    1994-01-01

    Four adult humans chose repeatedly between a fixed-time schedule (of points later exchangeable for money) and a progressive-time schedule that began at 0 s and increased by a fixed number of seconds with each point delivered by that schedule. Each point delivered by the fixed-time schedule reset the requirements of the progressive-time schedule to its minimum value. Subjects were provided with instructions that specified a particular sequence of choices. Under the initial conditions, the instructions accurately specified the optimal choice sequence. Thus, control by instructions and optimal control by the programmed contingencies both supported the same performance. To distinguish the effects of instructions from schedule sensitivity, the correspondence between the instructed and optimal choice patterns was gradually altered across conditions by varying the step size of the progressive-time schedule while maintaining the same instructions. Step size was manipulated, typically in 1-s units, first in an ascending and then in a descending sequence of conditions. Instructions quickly established control in all 4 subjects but, by narrowing the range of choice patterns, they reduced subsequent sensitivity to schedule changes. Instructional control was maintained across the ascending sequence of progressive-time values for each subject, but eventually diminished, giving way to more schedule-appropriate patterns. The transition from instruction-appropriate to schedule-appropriate behavior was characterized by an increase in the variability of choice patterns and local increases in point density. On the descending sequence of progressive-time values, behavior appeared to be schedule sensitive, sometimes even optimally sensitive, but it did not always change systematically with the contingencies, suggesting the involvement of other factors. PMID:16812747

  5. How do employees prioritise when they schedule their own shifts?

    PubMed

    Nabe-Nielsen, Kirsten; Lund, Henrik; Ajslev, Jeppe Z; Hansen, Åse Marie; Albertsen, Karen; Hvid, Helge; Garde, Anne Helene

    2013-01-01

    We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age, gender, cohabitation and health status were all significantly associated with at least one of these priorities. Intervention studies report limited health effects of self-scheduling. Therefore, we investigated to what extent employees prioritise their health and recuperation when scheduling their own shifts. We found that employees not only consider both their health and family but also the workplace's needs when they schedule their own shifts.

  6. Perceptions of randomized security schedules.

    PubMed

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  7. A De-centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments

    NASA Technical Reports Server (NTRS)

    Arora, Manish; Das, Sajal K.; Biswas, Rupak

    2002-01-01

    In the past two decades, numerous scheduling and load balancing techniques have been proposed for locally distributed multiprocessor systems. However, they all suffer from significant deficiencies when extended to a Grid environment: some use a centralized approach that renders the algorithm unscalable, while others assume the overhead involved in searching for appropriate resources to be negligible. Furthermore, classical scheduling algorithms do not consider a Grid node to be N-resource rich and merely work towards maximizing the utilization of one of the resources. In this paper, we propose a new scheduling and load balancing algorithm for a generalized Grid model of N-resource nodes that not only takes into account the node and network heterogeneity, but also considers the overhead involved in coordinating among the nodes. Our algorithm is decentralized, scalable, and overlaps the node coordination time with that of the actual processing of ready jobs, thus saving valuable clock cycles needed for making decisions. The proposed algorithm is studied by conducting simulations using the Message Passing Interface (MPI) paradigm.

  8. A De-Centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments

    NASA Technical Reports Server (NTRS)

    Arora, Manish; Das, Sajal K.; Biswas, Rupak; Biegel, Bryan (Technical Monitor)

    2002-01-01

    In the past two decades, numerous scheduling and load balancing techniques have been proposed for locally distributed multiprocessor systems. However, they all suffer from significant deficiencies when extended to a Grid environment: some use a centralized approach that renders the algorithm unscalable, while others assume the overhead involved in searching for appropriate resources to be negligible. Furthermore, classical scheduling algorithms do not consider a Grid node to be N-resource rich and merely work towards maximizing the utilization of one of the resources. In this paper we propose a new scheduling and load balancing algorithm for a generalized Grid model of N-resource nodes that not only takes into account the node and network heterogeneity, but also considers the overhead involved in coordinating among the nodes. Our algorithm is de-centralized, scalable, and overlaps the node coordination time of the actual processing of ready jobs, thus saving valuable clock cycles needed for making decisions. The proposed algorithm is studied by conducting simulations using the Message Passing Interface (MPI) paradigm.

  9. Show me the money: the implications of Schedule H.

    PubMed

    Salinsky, Eileen

    2009-04-21

    Responding to policymakers' concerns, the Internal Revenue Service (IRS) implemented significant new hospital community benefit reporting under Schedule H of its revised Form 990, the return used by tax-exempt organizations. This issue brief considers the policy implications of the quantitative and qualitative information that hospitals are now mandated to report through Schedule H, including the costs associated with charity care, bad debt, and the unreimbursed costs of Medicaid and Medicare. The paper examines unresolved issues related to the new reporting requirements, such as controversies regarding the scope of Schedule H, and considers the potential for these reports to influence IRS oversight activities, legislative action, and hospital policies and practices.

  10. Production scheduling with discrete and renewable additional resources

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Paprocka, I.; Kempa, W.

    2015-11-01

    In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development.

  11. Medications for Sleep Schedule Adjustments in Athletes.

    PubMed

    Baird, Matthew B; Asif, Irfan M

    Sleep schedule adjustments are common requirements of modern-day athletes. Many nonpharmacologic and pharmacologic strategies exist to facilitate circadian rhythm shifts to maximize alertness and performance during competition. This review summarizes the evidence for commonly used pharmacologic agents and presents recommendations for the sports medicine provider. MEDLINE searches were performed using the following keywords: sleep aids, circadian rhythm adjustment, athletes and sleep, caffeine and sports, melatonin and athletes, and sleep aids and sports. Pertinent articles were extracted and discussed. Clinical review. Level 2. There are very few available studies investigating pharmacologic sleep aids in athletes. Data from studies involving shift workers and airline personnel are more abundant and were used to formulate recommendations and conclusions. Melatonin, caffeine, and nonbenzodiazepine sleep aids have a role in facilitating sleep schedule changes in athletes and maximizing sports performance through sleep enhancement.

  12. Active patient involvement in the education of health professionals.

    PubMed

    Towle, Angela; Bainbridge, Lesley; Godolphin, William; Katz, Arlene; Kline, Cathy; Lown, Beth; Madularu, Ioana; Solomon, Patricia; Thistlethwaite, Jill

    2010-01-01

    Patients as educators (teaching intimate physical examination) first appeared in the 1960s. Since then, rationales for the active involvement of patients as educators have been well articulated. There is great potential to promote the learning of patient-centred practice, interprofessional collaboration, community involvement, shared decision making and how to support self-care. We reviewed and summarised the literature on active patient involvement in health professional education. A synthesis of the literature reveals increasing diversity in the ways in which patients are involved in education, but also the movement's weaknesses. Most initiatives are 'one-off' events and are reported as basic descriptions. There is little rigorous research or theory of practice or investigation of behavioural outcomes. The literature is scattered and uses terms (such as 'patient'!) that are contentious and confusing. We propose future directions for research and development, including a taxonomy to facilitate dialogue, an outline of a research strategy and reference to a comprehensive bibliography covering all health and human services.

  13. Sleep Duration, Schedule and Quality among Urban Chinese Children and Adolescents: Associations with Routine After-School Activities

    PubMed Central

    Jiang, Xiaoxiao; Hardy, Louise L.; Baur, Louise A.; Ding, Ding; Wang, Ling; Shi, Huijing

    2015-01-01

    Background With rapid urbanization accompanied by lifestyle changes, children and adolescents living in metropolitan areas are faced with many time use choices that compete with sleep. This study reports on the sleep hygiene of urban Chinese school students, and investigates the relationship between habitual after-school activities and sleep duration, schedule and quality on a regular school day. Methods Cross-sectional, school-based survey of school children (Grades 4–8) living in Shanghai, China, conducted in 2011. Self-reported data were collected on students’ sleep duration and timing, sleep quality, habitual after-school activities (i.e. homework, leisure-time physical activity, recreational screen time and school commuting time), and potential correlates. Results Mean sleep duration of this sample (mean age: 11.5-years; 48.6% girls) was 9 hours. Nearly 30% of students reported daytime tiredness. On school nights, girls slept less (p<0.001) and went to bed later (p<0.001), a sex difference that was more pronounced in older students. Age by sex interactions were observed for both sleep duration (p=0.005) and bedtime (p=0.002). Prolonged time spent on homework and mobile phone playing was related to shorter sleep duration and later bedtime. Adjusting for all other factors, with each additional hour of mobile phone playing, the odds of daytime tiredness and having difficulty maintaining sleep increased by 30% and 27% among secondary students, respectively. Conclusion There are sex differences in sleep duration, schedule and quality. Habitual activities had small but significant associations with sleep hygiene outcomes especially among secondary school students. Intervention strategies such as limiting children’s use of electronic screen devices after school are implicated. PMID:25611973

  14. Relationship between admission data and pharmacy student involvement in extracurricular activities.

    PubMed

    Kiersma, Mary E; Plake, Kimberly S; Mason, Holly L

    2011-10-10

    To assess pharmacy student involvement in leadership and service roles and to evaluate the association between admissions data and student involvement. Doctor of pharmacy (PharmD) students were invited to complete a 56-item online survey instrument containing questions regarding leadership and service involvement, work experiences, perceived contribution of involvement to skill development, and perceived importance of involvement. Responses were linked to admissions data to identify possible associations. Five hundred fourteen (82.4%) pharmacy students completed the survey instrument. Students with higher admissions application and interview scores were more likely to be involved in organizations and hold leadership roles, while students with higher admissions grade point averages were less likely to be involved in organizations and leadership roles. Assessing students' involvement in leadership and service roles can assist in the evaluation of students' leadership skills and lead to modification of curricular and co-curricular activities to provide development opportunities. Student involvement in extracurricular activities may encourage future involvement in and commitment to the pharmacy profession.

  15. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  16. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  17. Multiple Power-Saving MSSs Scheduling Methods for IEEE802.16e Broadband Wireless Networks

    PubMed Central

    2014-01-01

    This work proposes two enhanced multiple mobile subscriber stations (MSSs) power-saving scheduling methods for IEEE802.16e broadband wireless networks. The proposed methods are designed for the Unsolicited Grant Service (UGS) of IEEE802.16e. To reduce the active periods of all power-saving MSSs, the base station (BS) allocates each MSS fewest possible transmission frames to retrieve its data from the BS. The BS interlaces the active periods of each MSS to increase the amount of scheduled MSSs and splits the overflowing transmission frames to maximize the bandwidth utilization. Simulation results reveal that interlacing the active periods of MSSs can increase the number of scheduled MSSs to more than four times of that in the Direct scheduling method. The bandwidth utilization can thus be improved by 60%–70%. Splitting the overflowing transmission frames can improve bandwidth utilization by more than 10% over that achieved using the method of interlacing active periods, with a sacrifice of only 1% of the sleep periods in the interlacing active period method. PMID:24523656

  18. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  19. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  20. Everyday Technology Use Related to Activity Involvement Among People in Cognitive Decline.

    PubMed

    Hedman, Annicka; Nygård, Louise; Kottorp, Anders

    We investigated how everyday technology use related to activity involvement over 5 yr in people with mild cognitive impairment. Thirty-seven older adults with mild cognitive impairment were evaluated regarding everyday technology use and involvement in activities over time. Information on diagnostic changes was collected from medical files. Linear mixed-effects models were used in data analysis. Ability to use everyday technology showed a significant effect on activity involvement (p = .007) beyond the effects of time, diagnostic change, and age. Decreases in number of everyday technologies used (p < .001) and share of accessible and relevant everyday technologies used (p = .04) were associated with decreasing activity involvement. However, these two aspects did not reinforce each other. When monitoring activity involvement in clients with cognitive decline, health care professionals should take into account clients' ability to use everyday technologies and the amount of everyday technologies they use. Copyright © 2017 by the American Occupational Therapy Association, Inc.

  1. 24 CFR 1000.501 - Who is involved in monitoring activities under NAHASDA?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability § 1000.501 Who is involved in monitoring activities under NAHASDA? The recipient, the grant beneficiary and HUD are involved in monitoring activities under NAHASDA. ...

  2. 24 CFR 1000.501 - Who is involved in monitoring activities under NAHASDA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability § 1000.501 Who is involved in monitoring activities under NAHASDA? The recipient, the grant beneficiary and HUD are involved in monitoring activities under NAHASDA. ...

  3. 24 CFR 1000.501 - Who is involved in monitoring activities under NAHASDA?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability § 1000.501 Who is involved in monitoring activities under NAHASDA? The recipient, the grant beneficiary and HUD are involved in monitoring activities under NAHASDA. ...

  4. 24 CFR 1000.501 - Who is involved in monitoring activities under NAHASDA?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability § 1000.501 Who is involved in monitoring activities under NAHASDA? The recipient, the grant beneficiary and HUD are involved in monitoring activities under NAHASDA. ...

  5. 24 CFR 1000.501 - Who is involved in monitoring activities under NAHASDA?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Recipient Monitoring, Oversight and Accountability § 1000.501 Who is involved in monitoring activities under NAHASDA? The recipient, the grant beneficiary and HUD are involved in monitoring activities under NAHASDA. ...

  6. A Comparison of Software Schedule Estimators

    DTIC Science & Technology

    1990-09-01

    SLIM ...................................... 33 SPQR /20 ................................... 35 System -4 .................................... 37 Previous...24 3. PRICE-S Outputs ..................................... 26 4. COCOMO Factors by Category ........................... 28 5. SPQR /20 Activities...actual schedules experienced on the projects. The models analyzed were REVIC, PRICE-S, System-4, SPQR /20, and SEER. ix A COMPARISON OF SOFTWARE

  7. A Comparison of Five Reinforcement Schedules for Use in Contingency Management-Based Treatment of Methamphetamine Abuse

    ERIC Educational Resources Information Center

    Roll, John M.; Huber, Alice; Sodano, Ruthlyn; Chudzynski, Joy E.; Moynier, Eugene; Shoptaw, Steve

    2006-01-01

    One variation of contingency management involves providing vouchers with monetary value for the provision of a biological sample indicating no recent drug use. These vouchers can be exchanged for goods or services. The schedule with which the vouchers are disbursed has been studied and results suggest that those schedules that incorporate…

  8. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  9. Synthesis of power plant outage schedules. Final technical report, April 1995-January 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, D.R.

    This document provides a report on the creation of domain theories in the power plant outage domain. These were developed in conjunction with the creation of a demonstration system of advanced scheduling technology for the outage problem. In 1994 personnel from Rome Laboratory (RL), Kaman Science (KS), Kestrel Institute, and the Electric Power Research Institute (EPRI) began a joint project to develop scheduling tools for power plant outage activities. This report describes our support for this joint effort. The project uses KIDS (Kestrel Interactive Development System) to generate schedulers from formal specifications of the power plant domain outage activities.

  10. XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL

    NASA Technical Reports Server (NTRS)

    Mulnix, C. L.

    1994-01-01

    XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has

  11. Production Scheduling for Rehabilitation Workshops.

    ERIC Educational Resources Information Center

    Hietala, David A.

    This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…

  12. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  13. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    NASA Technical Reports Server (NTRS)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  14. Enhancing the activity of cannabidiol and other cannabinoids in vitro through modifications to drug combinations and treatment schedules.

    PubMed

    Scott, Katherine Ann; Shah, Sini; Dalgleish, Angus George; Liu, Wai Man

    2013-10-01

    Cannabinoids are the bioactive components of the Cannabis plant that display a diverse range of therapeutic qualities. We explored the activity of six cannabinoids, used both alone and in combination in leukaemic cells. Cannabinoids were cytostatic and caused a simultaneous arrest at all phases of the cell cycle. Re-culturing pre-treated cells in drug-free medium resulted in dramatic reductions in cell viability. Furthermore, combining cannabinoids was not antagonistic. We suggest that the activities of some cannabinoids are influenced by treatment schedules; therefore, it is important to carefully select the most appropriate strategy in order to maximise their efficacy.

  15. The application of artificial intelligence to astronomical scheduling problems

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  16. A Genetic Algorithm Tool (splicer) for Complex Scheduling Problems and the Space Station Freedom Resupply Problem

    NASA Technical Reports Server (NTRS)

    Wang, Lui; Valenzuela-Rendon, Manuel

    1993-01-01

    The Space Station Freedom will require the supply of items in a regular fashion. A schedule for the delivery of these items is not easy to design due to the large span of time involved and the possibility of cancellations and changes in shuttle flights. This paper presents the basic concepts of a genetic algorithm model, and also presents the results of an effort to apply genetic algorithms to the design of propellant resupply schedules. As part of this effort, a simple simulator and an encoding by which a genetic algorithm can find near optimal schedules have been developed. Additionally, this paper proposes ways in which robust schedules, i.e., schedules that can tolerate small changes, can be found using genetic algorithms.

  17. A computer method for schedule processing and quick-time updating.

    NASA Technical Reports Server (NTRS)

    Mccoy, W. H.

    1972-01-01

    A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.

  18. Relationship Between Admission Data and Pharmacy Student Involvement in Extracurricular Activities

    PubMed Central

    Plake, Kimberly S.; Mason, Holly L.

    2011-01-01

    Objectives. To assess pharmacy student involvement in leadership and service roles and to evaluate the association between admissions data and student involvement. Methods. Doctor of pharmacy (PharmD) students were invited to complete a 56-item online survey instrument containing questions regarding leadership and service involvement, work experiences, perceived contribution of involvement to skill development, and perceived importance of involvement. Responses were linked to admissions data to identify possible associations. Results. Five hundred fourteen (82.4%) pharmacy students completed the survey instrument. Students with higher admissions application and interview scores were more likely to be involved in organizations and hold leadership roles, while students with higher admissions grade point averages were less likely to be involved in organizations and leadership roles. Conclusions. Assessing students’ involvement in leadership and service roles can assist in the evaluation of students’ leadership skills and lead to modification of curricular and co-curricular activities to provide development opportunities. Student involvement in extracurricular activities may encourage future involvement in and commitment to the pharmacy profession. PMID:22102745

  19. Schedules of Controlled Substances: Temporary Placement of Six Synthetic Cannabinoids (5F-ADB, 5F-AMB, 5F-APINACA, ADB-FUBINACA, MDMB-CHMICA and MDMB-FUBINACA) into Schedule I. Temporary Scheduling Order.

    PubMed

    2017-04-10

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule six synthetic cannabinoids: methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [5F-ADB; 5F-MDMB-PINACA]; methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3-methylbutanoate [5F-AMB]; N-(adamantan-1-yl)-1-(5-fluoropentyl)-1H-indazole-3-carboxamide [5F-APINACA, 5F-AKB48]; N-(1-amino-3,3-dimethyl-1-oxobutan-2-yl)-1-(4-fluorobenzyl)-1H-indazole-3-carboxamide [ADB-FUBINACA]; methyl 2-(1-(cyclohexylmethyl)-1H-indole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-CHMICA, MMB-CHMINACA] and methyl 2-(1-(4-fluorobenzyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-FUBINACA], and their optical, positional, and geometric isomers, salts, and salts of isomers into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of these synthetic cannabinoids into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 5F-ADB, 5F-AMB, 5F-APINACA, ADB-FUBINACA, MDMB-CHMICA or MDMB-FUBINACA.

  20. Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

  1. Perturbation schedule does not alter retention of a locomotor adaptation across days.

    PubMed

    Hussain, Sara J; Morton, Susanne M

    2014-06-15

    Motor adaptation in response to gradual vs. abrupt perturbation schedules may involve different neural mechanisms, potentially leading to different levels of motor memory. However, no study has investigated whether perturbation schedules alter memory of a locomotor adaptation across days. We measured adaptation and retention (memory) of altered interlimb symmetry during walking in two groups of participants over 2 days. On day 1, participants adapted to either a single, large perturbation (abrupt schedule) or a series of small perturbations that increased in size over time (gradual schedule). Retention was examined on day 2. On day 1, initial swing time and foot placement symmetry error sizes differed between groups but overall adaptation magnitudes were similar. On day 2, participants in both groups showed similar retention, readaptation, and aftereffect sizes, although there were some trends for improved memory in the abrupt group. These results conflict with previous data but are consistent with newer studies reporting no behavioral differences following adaptation using abrupt vs. gradual schedules. Although memory levels were very similar between groups, we cannot rule out the possibility that the neural mechanisms underlying this memory storage differ. Overall, it appears that adaptation of locomotor patterns via abrupt and gradual perturbation schedules produces similar expression of locomotor memories across days. Copyright © 2014 the American Physiological Society.

  2. Devising work schedules for a collective: favouring intergenerational collaboration among counsellors in a shelter for female victims of conjugal violence.

    PubMed

    Chatigny, Céline

    2011-01-01

    The work activity of counsellors in shelters for female victims of conjugal violence is explored. The consortium of shelters requested the study because of complaints of worker stress, difficulties in management and high employee turnover. This qualitative and participatory community study involved a team of specialists in ergonomics and social work from the Centre de recherche interdisciplinaire sur la biologie, la santé, la sociélté et l'environnement (CINBIOSE), brought together by the Community Outreach Service of Université du Québec à Montréal (UQAM). Presented here are the study findings pertaining to training. Twenty-two semi-structured interviews and 80 hours of observation of work and training were conducted with counsellors from two contrasting shelters. Observations revealed an intense collaborative activity involving communication by many means. Nonetheless, young counsellors interviewed complained of having few opportunities to develop their counselling skills because they were isolated on evening, night and weekend shifts. In collaboration with the ergonomists, one shelter experimented with new ways of devising the work schedule to favour learning and training. By transforming the training mechanism, job status and work schedules, the shelter made the conditions more conducive to the development of counsellors' skills and health, while eliminating turnover for at least the two following years.

  3. Prisoners of Time: Implementing a Block Schedule in the High School.

    ERIC Educational Resources Information Center

    Mistretta, Gerald M.; Polansky, Harvey B.

    1997-01-01

    A committee comprised of six veteran teachers, the principal, and one parent initiated East Lyme (Connecticut) High School's search for a workable school schedule. The alternative-day block schedule featured semester and full-year course formats, 85-minute time blocks, a 45-minute lunch/club/activity period, and a closed campus. A survey found…

  4. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  5. Surgical demand scheduling: a review.

    PubMed Central

    Magerlein, J M; Martin, J B

    1978-01-01

    This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987

  6. Online Appointment Scheduling for a Nuclear Medicine Department in a Chinese Hospital

    PubMed Central

    Feng, Ya-bing

    2018-01-01

    Nuclear medicine, a subspecialty of radiology, plays an important role in proper diagnosis and timely treatment. Multiple resources, especially short-lived radiopharmaceuticals involved in the process of nuclear medical examination, constitute a unique problem in appointment scheduling. Aiming at achieving scientific and reasonable appointment scheduling in the West China Hospital (WCH), a typical class A tertiary hospital in China, we developed an online appointment scheduling algorithm based on an offline nonlinear integer programming model which considers multiresources allocation, the time window constraints imposed by short-lived radiopharmaceuticals, and the stochastic nature of the patient requests when scheduling patients. A series of experiments are conducted to show the effectiveness of the proposed strategy based on data provided by the WCH. The results show that the examination amount increases by 29.76% compared with the current one with a significant increase in the resource utilization and timely rate. Besides, it also has a high stability for stochastic factors and bears the advantage of convenient and economic operation. PMID:29849748

  7. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    NASA Astrophysics Data System (ADS)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  8. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  9. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  10. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  11. Optimizing tillage schedule for maintaining activity of the arbuscular mycorrhizal fungal population in a rainfed upland rice (Oryza sativa L.) agro-ecosystem.

    PubMed

    Maiti, D; Variar, M; Singh, R K

    2011-04-01

    Rainfed uplands in India are predominantly mono-cropped with rice (Oryza sativa L.) in the wet season (June/July to September/October) and grown under aerobic soil conditions. The remaining fallow period (winter followed by summer) of about 8-9 months leads to natural crash in the population of native arbuscular mycorrhizal fungi (AMF) in the soil. Attempts have been made to minimize this population crash by reducing soil disturbance-induced deleterious effects on native AMF activity of improperly scheduled off-season tillage, an agronomic recommendation for weed and disease (soil-borne) management, practiced by the upland farmers. On-farm (farmers' field) evaluation of effects of all suitable off-season tillage schedule combinations on rice during wet seasons of 2004, 2005, and 2006 revealed that a maximum of two off-season tillage schedules with a minimum gap of 13 weeks between them minimized the population crash of native AMF with a concomitant increase in phosphorus (P) uptake and grain yield of upland rice (variety "Vandana").

  12. Moon Watch: A Parental-Involvement Homework Activity.

    ERIC Educational Resources Information Center

    Rillero, Peter; Gonzalez-Jensen, Margarita; Moy, Tracy

    2000-01-01

    Presents the goals, philosophy, and methods of the SPLASH (Student-Parent Laboratories Achieving Science at Home) program. Describes an at-home, parental-involvement activity called Moon Watch in which students and their parents observe how the phases of the moon and the moon's position in the sky change over a two-week period. (WRM)

  13. The Over-Scheduling Myth. Research-to-Results Brief. Publication #2008-12

    ERIC Educational Resources Information Center

    Mahoney, Joseph L.; Harris, Angel L.; Eccles, Jacquelynne S.

    2008-01-01

    Contrary to popular hypothesis, recent research rejects the notion that most or even many children and youth are over-scheduled and are suffering as a result. In fact, less than one in ten could be described as over-scheduled. Moreover, research indicates that only six in ten children and youth participate in organized out-of-school activities at…

  14. Predictors of activity involvement in dementia care homes: a cross-sectional study.

    PubMed

    Smit, Dieneke; de Lange, Jacomine; Willemse, Bernadette; Pot, Anne Margriet

    2017-08-04

    Despite the finding that involvement in activities is one of the most important needs of residents with dementia living in care homes, care facilities struggle to fulfill this need. Over the years, various factors are suggested which may contribute to or disable activity provision in dementia care homes. These include limited financial resources, task oriented staff and disease-related characteristics of residents. This study aims to further clarify which of these factors predict higher activity involvement. Data were derived from the second measurement (2011) of the Living Arrangements for people with Dementia study. One thousand two hundred eighteen people residing in 139 dementia care homes were involved. Forty predictors of higher involvement were studied. Multilevel backward regression analyses were performed. The most important predictors of higher involvement were: absence of agitation, less ADL dependency, and a higher cognitive status of the residents, higher staff educational level, lower experienced job demands by care staff and a smaller number of residents living in the dementia care wards of a facility. More social supervisor support as perceived by staff was found to predict less activity involvement. To increase the activity involvement of care home residents with dementia it seems vital to: 1) reduce staff's experienced job demands; 2) elevate their overall educational level; 3) train staff to provide suitable activities, taking account of the behavior and preserved capabilities of residents; and 4) foster transition towards small-scale care. In order to achieve these aims, care organizations might need to evaluate the use of their financial means.

  15. A Profile of Latino School-Based Extracurricular Activity Involvement

    ERIC Educational Resources Information Center

    Peguero, Anthony A.

    2010-01-01

    Participation in school-based extracurricular activities influences educational success. Thus, it is important to depict a profile of school-based extracurricular activity involvement for a Latino student population that is marginalized in schools. This research uses the Educational Longitudinal Study of 2002 and logistic regression analyses to…

  16. An Example of Discovery Research Involving the Transfer of Stimulus Control

    PubMed Central

    2005-01-01

    The initial purpose of the present study was to replicate procedures for teaching preschool children to recruit attention at appropriate times by having an experimenter signal the availability and unavailability of attention (i.e., arrange a multiple schedule involving reinforcement and extinction; Tiger & Hanley, 2004). Following the development of discriminated social responding, the schedule-correlated stimuli were removed (i.e., a mixed schedule of reinforcement was arranged). However, discriminated responding continued during these conditions. Further evaluation suggested that stimulus control over children's social responding had transferred from the schedule-correlated stimuli to the delivery of reinforcement. The effect of a history of reinforcement under multiple-schedule conditions on performance under mixed schedules was then replicated with 2 participants in a reversal design. These findings suggest that following experience with schedule-correlated stimuli, these stimuli may be removed with only modest disruption to discriminated responding. PMID:16463530

  17. Parallel scheduling of recursively defined arrays

    NASA Technical Reports Server (NTRS)

    Myers, T. J.; Gokhale, M. B.

    1986-01-01

    A new method of automatic generation of concurrent programs which constructs arrays defined by sets of recursive equations is described. It is assumed that the time of computation of an array element is a linear combination of its indices, and integer programming is used to seek a succession of hyperplanes along which array elements can be computed concurrently. The method can be used to schedule equations involving variable length dependency vectors and mutually recursive arrays. Portions of the work reported here have been implemented in the PS automatic program generation system.

  18. 1993 Wholesale Power and Transmission Rate Schedules.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  19. Schedules of Controlled Substances: Placement of UR-144, XLR11, and AKB48 into Schedule I. Final rule.

    PubMed

    2016-05-11

    With the issuance of this final rule, the Drug Enforcement Administration places (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11), and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48), including their salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule I of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle UR-144, XLR11, or AKB48.

  20. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  1. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seed, Ian; James, Paula; Mathieson, John

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchangemore » through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple

  2. Comparing fixed-amount and progressive-amount DRO Schedules for tic suppression in youth with chronic tic disorders.

    PubMed

    Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W

    2017-01-01

    Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.

  3. Metronomic cyclophosphamide schedule-dependence of innate immune cell recruitment and tumor regression in an implanted glioma model

    PubMed Central

    Wu, Junjie; Waxman, David J.

    2014-01-01

    Metronomic cyclophosphamide (CPA) treatment activates robust innate anti-tumor immunity and induces major regression of large, implanted brain tumor xenografts when administered on an intermittent, every 6-day schedule, but not on a daily low-dose or a maximum-tolerated dose CPA schedule. Here, we used an implanted GL261 glioma model to compare five intermittent metronomic CPA schedules to elucidate the kinetics and schedule dependence of innate immune cell recruitment and tumor regression. Tumor-recruited natural killer cells induced by two every 6-day treatment cycles were significantly ablated one day after a third CPA treatment, but largely recovered several days later. Natural killer and other tumor-infiltrating innate immune cells peaked 12 days after the last CPA treatment on the every 6-day schedule, suggesting that drug-free intervals longer than 6 days may show increased efficacy. Metronomic CPA treatments spaced 9 or 12 days apart, or on an alternating 6 and 9 day schedule, induced extensive tumor regression, similar to the 6-day schedule, however, the tumor-infiltrating natural killer cell responses were not sustained, leading to rapid resumption of tumor regrowth after day 24, despite ongoing metronomic CPA treatment. Increasing the CPA dose prolonged the period of tumor regression on the every 9-day schedule, but natural killer cell activation was markedly decreased. Thus, while several intermittent metronomic CPA treatment schedules can activate innate immune cell recruitment leading to major tumor regression, sustained immune and anti-tumor responses are only achieved on the 6-day schedule. However, even with this schedule, some tumors eventually relapse, indicating a need for further improvements in immunogenic metronomic therapies. PMID:25069038

  4. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  5. Factors associated with attendance to scheduled outpatient endoscopy

    PubMed Central

    Laiyemo, Adeyinka O.; Williams, Carla D.; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D.; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F.; Smoot, Duane T.

    2015-01-01

    Background Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the United States. Objectives To evaluate attendance to outpatient endoscopy among populations with low SES after in-person consultations with endoscopists prior to scheduling. Methods Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 hours prior to their scheduled procedures and did not show up . Results A total of 3,304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% females). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95%CI: 1.07–2.04) were more likely to attend when compared to patients seen in trainees’ continuity clinic. Married patients (OR=1.40; 95%CI: 1.11–1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients who were 50 years and older were more likely to attend. Conclusions Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to out-patient endoscopy by directly involving the social support of the patients. PMID:25180285

  6. Factors associated with attendance to scheduled outpatient endoscopy.

    PubMed

    Laiyemo, Adeyinka O; Williams, Carla D; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F; Smoot, Duane T

    2014-10-01

    Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the USA. To evaluate attendance to outpatient endoscopy among populations with low SES after inperson consultations with endoscopists prior to scheduling. Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington, DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 h prior to their scheduled procedures and did not show up. A total of 3304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% women). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95% CI 1.07 to 2.04) were more likely to attend when compared with patients seen in trainees' continuity clinic. Married patients (OR=1.40; 95% CI 1.11 to 1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients aged 50 years and older were more likely to attend. Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to outpatient endoscopy by directly involving the social support of the patients. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  7. Shift work, age, and performance : investigation of the 2-2-1 shift schedule used in air traffic control facilities. I., The sleep/wake cycle.

    DOT National Transportation Integrated Search

    1995-05-01

    Air Traffic Control Specialists (ATCS) work rotating shift schedules for most of their careers. Specifically, many work a counterclockwise rotating shift schedule, called the 2-2-1, or some variation of the schedule. The 2-2-1 involves rotating from ...

  8. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hulett, David T.; Nosbisch, Michael R.

    This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution

  9. Optimizing the dosing schedule of l-asparaginase improves its anti-tumor activity in breast tumor-bearing mice.

    PubMed

    Shiromizu, Shoya; Kusunose, Naoki; Matsunaga, Naoya; Koyanagi, Satoru; Ohdo, Shigehiro

    2018-04-01

    Proliferation of acute lymphoblastic leukemic cells is nutritionally dependent on the external supply of asparagine. l-asparaginase, an enzyme hydrolyzing l-asparagine in blood, is used for treatment of acute lymphoblastic leukemic and other related blood cancers. Although previous studies demonstrated that l-asparaginase suppresses the proliferation of cultured solid tumor cells, it remains unclear whether this enzyme prevents the growth of solid tumors in vivo. In this study, we demonstrated the importance of optimizing dosing schedules for the anti-tumor activity of l-asparaginase in 4T1 breast tumor-bearing mice. Cultures of several types of murine solid tumor cells were dependent on the external supply of asparagine. Among them, we selected murine 4T1 breast cancer cells and implanted them into BALB/c female mice kept under standardized light/dark cycle conditions. The growth of 4T1 tumor cells implanted in mice was significantly suppressed by intravenous administration of l-asparaginase during the light phase, whereas its administration during the dark phase failed to show significant anti-tumor activity. Decreases in plasma asparagine levels due to the administration of l-asparaginase were closely related to the dosing time-dependency of its anti-tumor effects. These results suggest that the anti-tumor efficacy of l-asparaginase in breast tumor-bearing mice is improved by optimizing the dosing schedule. Copyright © 2018 The Authors. Production and hosting by Elsevier B.V. All rights reserved.

  10. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    PubMed Central

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  11. Toward interactive scheduling systems for managing medical resources.

    PubMed

    Oddi, A; Cesta, A

    2000-10-01

    Managers of medico-hospital facilities are facing two general problems when allocating resources to activities: (1) to find an agreement between several and contrasting requirements; (2) to manage dynamic and uncertain situations when constraints suddenly change over time due to medical needs. This paper describes the results of a research aimed at applying constraint-based scheduling techniques to the management of medical resources. A mixed-initiative problem solving approach is adopted in which a user and a decision support system interact to incrementally achieve a satisfactory solution to the problem. A running prototype is described called Interactive Scheduler which offers a set of functionalities for a mixed-initiative interaction to cope with the medical resource management. Interactive Scheduler is endowed with a representation schema used for describing the medical environment, a set of algorithms that address the specific problems of the domain, and an innovative interaction module that offers functionalities for the dialogue between the support system and its user. A particular contribution of this work is the explicit representation of constraint violations, and the definition of scheduling algorithms that aim at minimizing the amount of constraint violations in a solution.

  12. Complex ambulatory settings demand scheduling systems.

    PubMed

    Ross, K M

    1998-01-01

    Practice management systems are becoming more and more complex, as they are asked to integrate all aspects of patient and resource management. Although patient scheduling is a standard expectation in any ambulatory environment, facilities and equipment resource scheduling are additional functionalities of scheduling systems. Because these functions were not typically managed in manual patient scheduling, often the result was resource mismanagement, along with a potential negative impact on utilization, patient flow and provider productivity. As ambulatory organizations have become more seasoned users of practice management software, the value of resource scheduling has become apparent. Appointment scheduling within a fully integrated practice management system is recognized as an enhancement of scheduling itself and provides additional tools to manage other information needs. Scheduling, as one component of patient information management, provides additional tools in these areas.

  13. Is There a Downside to Schedule Control for the Work-Family Interface?

    ERIC Educational Resources Information Center

    Schieman, Scott; Young, Marisa

    2010-01-01

    Using data from a 2007 U.S. survey of workers, this article examines the implications of schedule control for work-family role blurring and work-family conflict. Four main findings indicate that (a) schedule control is associated with more frequent working at home and work-family multitasking activities; (b) the positive association between…

  14. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  15. Discrete Optimization Model for Vehicle Routing Problem with Scheduling Side Cosntraints

    NASA Astrophysics Data System (ADS)

    Juliandri, Dedy; Mawengkang, Herman; Bu'ulolo, F.

    2018-01-01

    Vehicle Routing Problem (VRP) is an important element of many logistic systems which involve routing and scheduling of vehicles from a depot to a set of customers node. This is a hard combinatorial optimization problem with the objective to find an optimal set of routes used by a fleet of vehicles to serve the demands a set of customers It is required that these vehicles return to the depot after serving customers’ demand. The problem incorporates time windows, fleet and driver scheduling, pick-up and delivery in the planning horizon. The goal is to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the overall costs of all routes over the planning horizon. We model the problem as a linear mixed integer program. We develop a combination of heuristics and exact method for solving the model.

  16. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activitiesmore » that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support

  17. Activities involving aeronautical, space science, and technology support for minority institutions

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Final Report addressed the activities with which the Interracial Council for Business Opportunity (ICBO) was involved over the past 12 months. ICBO was involved in the design and development of a CARES Student Tracking System Software (CARES). Cares is intended to provide an effective means of maintaining relevant current and historical information on NASA-funded students through a range of educational program initiatives. ICBP was extensively involved in the formation of a minority university consortium amd implementation of collaborative research activities by the consortium as part of NASA's Mission to Planet Earth/Earth Observing System. ICBO was involved in the formation of an HBCU/MI Consortium to facilitate technology transfer efforts to the small and minority business community in their respective regions.

  18. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    ERIC Educational Resources Information Center

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  19. An expert system for scheduling requests for communications Links between TDRSS and ERBS

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Littlefield, Ronald G.; Beyer, David S.

    1987-01-01

    An ERBS-TDRSS Contact Planning System (ERBS-TDRSS CPS) is described which uses a graphics interface and the NASA Transportable Interference Engine. The procedure involves transfer of the ERBS-TDRSS Ground Track Orbit Prediction data to the ERBS flight operations area, where the ERBS-TDRSS CPS automatically generates requests for TDRSS service. As requested events are rejected, alternative context sensitive strategies are employed to generate new requested events until a schedule is completed. A report generator builds schedule requests for separate ERBS-TDRSS contacts.

  20. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  1. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  2. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  3. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  4. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  5. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  6. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... the serious health condition of a covered family member or the employee or the serious injury or...

  7. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  8. Scheduling with non-decreasing deterioration jobs and variable maintenance activities on a single machine

    NASA Astrophysics Data System (ADS)

    Zhang, Xingong; Yin, Yunqiang; Wu, Chin-Chia

    2017-01-01

    There is a situation found in many manufacturing systems, such as steel rolling mills, fire fighting or single-server cycle-queues, where a job that is processed later consumes more time than that same job when processed earlier. The research finds that machine maintenance can improve the worsening of processing conditions. After maintenance activity, the machine will be restored. The maintenance duration is a positive and non-decreasing differentiable convex function of the total processing times of the jobs between maintenance activities. Motivated by this observation, the makespan and the total completion time minimization problems in the scheduling of jobs with non-decreasing rates of job processing time on a single machine are considered in this article. It is shown that both the makespan and the total completion time minimization problems are NP-hard in the strong sense when the number of maintenance activities is arbitrary, while the makespan minimization problem is NP-hard in the ordinary sense when the number of maintenance activities is fixed. If the deterioration rates of the jobs are identical and the maintenance duration is a linear function of the total processing times of the jobs between maintenance activities, then this article shows that the group balance principle is satisfied for the makespan minimization problem. Furthermore, two polynomial-time algorithms are presented for solving the makespan problem and the total completion time problem under identical deterioration rates, respectively.

  9. Real-time distributed scheduling algorithm for supporting QoS over WDM networks

    NASA Astrophysics Data System (ADS)

    Kam, Anthony C.; Siu, Kai-Yeung

    1998-10-01

    Most existing or proposed WDM networks employ circuit switching, typically with one session having exclusive use of one entire wavelength. Consequently they are not suitable for data applications involving bursty traffic patterns. The MIT AON Consortium has developed an all-optical LAN/MAN testbed which provides time-slotted WDM service and employs fast-tunable transceivers in each optical terminal. In this paper, we explore extensions of this service to achieve fine-grained statistical multiplexing with different virtual circuits time-sharing the wavelengths in a fair manner. In particular, we develop a real-time distributed protocol for best-effort traffic over this time-slotted WDM service with near-optical fairness and throughput characteristics. As an additional design feature, our protocol supports the allocation of guaranteed bandwidths to selected connections. This feature acts as a first step towards supporting integrated services and quality-of-service guarantees over WDM networks. To achieve high throughput, our approach is based on scheduling transmissions, as opposed to collision- based schemes. Our distributed protocol involves one MAN scheduler and several LAN schedulers (one per LAN) in a master-slave arrangement. Because of propagation delays and limits on control channel capacities, all schedulers are designed to work with partial, delayed traffic information. Our distributed protocol is of the `greedy' type to ensure fast execution in real-time in response to dynamic traffic changes. It employs a hybrid form of rate and credit control for resource allocation. We have performed extensive simulations, which show that our protocol allocates resources (transmitters, receivers, wavelengths) fairly with high throughput, and supports bandwidth guarantees.

  10. Reactive Scheduling in Multipurpose Batch Plants

    NASA Astrophysics Data System (ADS)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  11. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    NASA Astrophysics Data System (ADS)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  12. Taking the Lag out of Jet Lag through Model-Based Schedule Design

    PubMed Central

    Dean, Dennis A.; Forger, Daniel B.; Klerman, Elizabeth B.

    2009-01-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep–wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep–wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep–wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep–wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep–wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions. PMID:19543382

  13. Schedule-Aware Workflow Management Systems

    NASA Astrophysics Data System (ADS)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  14. Sensor-scheduling simulation of disparate sensors for Space Situational Awareness

    NASA Astrophysics Data System (ADS)

    Hobson, T.; Clarkson, I.

    2011-09-01

    The art and science of space situational awareness (SSA) has been practised and developed from the time of Sputnik. However, recent developments, such as the accelerating pace of satellite launch, the proliferation of launch capable agencies, both commercial and sovereign, and recent well-publicised collisions involving man-made space objects, has further magnified the importance of timely and accurate SSA. The United States Strategic Command (USSTRATCOM) operates the Space Surveillance Network (SSN), a global network of sensors tasked with maintaining SSA. The rapidly increasing number of resident space objects will require commensurate improvements in the SSN. Sensors are scarce resources that must be scheduled judiciously to obtain measurements of maximum utility. Improvements in sensor scheduling and fusion, can serve to reduce the number of additional sensors that may be required. Recently, Hill et al. [1] have proposed and developed a simulation environment named TASMAN (Tasking Autonomous Sensors in a Multiple Application Network) to enable testing of alternative scheduling strategies within a simulated multi-sensor, multi-target environment. TASMAN simulates a high-fidelity, hardware-in-the-loop system by running multiple machines with different roles in parallel. At present, TASMAN is limited to simulations involving electro-optic sensors. Its high fidelity is at once a feature and a limitation, since supercomputing is required to run simulations of appreciable scale. In this paper, we describe an alternative, modular and scalable SSA simulation system that can extend the work of Hill et al with reduced complexity, albeit also with reduced fidelity. The tool has been developed in MATLAB and therefore can be run on a very wide range of computing platforms. It can also make use of MATLAB’s parallel processing capabilities to obtain considerable speed-up. The speed and flexibility so obtained can be used to quickly test scheduling algorithms even with a

  15. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  16. Self-scheduling with Microsoft Excel.

    PubMed

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  17. The LSST OCS scheduler design

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Schumacher, German

    2014-08-01

    The Large Synoptic Survey Telescope (LSST) is a complex system of systems with demanding performance and operational requirements. The nature of its scientific goals requires a special Observatory Control System (OCS) and particularly a very specialized automatic Scheduler. The OCS Scheduler is an autonomous software component that drives the survey, selecting the detailed sequence of visits in real time, taking into account multiple science programs, the current external and internal conditions, and the history of observations. We have developed a SysML model for the OCS Scheduler that fits coherently in the OCS and LSST integrated model. We have also developed a prototype of the Scheduler that implements the scheduling algorithms in the simulation environment provided by the Operations Simulator, where the environment and the observatory are modeled with real weather data and detailed kinematics parameters. This paper expands on the Scheduler architecture and the proposed algorithms to achieve the survey goals.

  18. Illicit online marketing of lorcaserin before DEA scheduling.

    PubMed

    Liang, Bryan A; Mackey, Tim K; Archer-Hayes, Ashley N; Shinn, Linda M

    2013-05-01

    Antiobesity drugs have been marketed illicitly by "no prescription" online pharmacies after approval and scheduling by the drug enforcement agency. We assess whether antiobesity drug Belviq® (lorcaserin HCl) was available from illicit online vendors before DEA-scheduling when sales are unauthorized. Online searches of "buy Belviq no prescription" examining first five result pages marketing the drug. Searches were performed from 11/5/2012-12/8/2012, prior to DEA scheduing. Belviq® is actively marketed by "no prescription" online vendors despite official unavailability and prescription requirements. Approaches included direct-to-consumer advertising using descriptive website URLs; linking to illicit marketers; and directing customers to other weight-loss websites for additional marketing. Finally, large quantities were marketed by business-to-business vendors. Illicit online "no prescription" pharmacies are marketing unauthorized, suspect antiobesity drugs before DEA scheduling and permitted marketing. Regulators must legally intercede to ensure patient safety, and providers must educate patients about online-sourcing risks. Copyright © 2013 The Obesity Society.

  19. A unique, fast-forwards rotating schedule with 12-h long shifts prevents chronic sleep debt.

    PubMed

    Fischer, Dorothee; Vetter, Céline; Oberlinner, Christoph; Wegener, Sven; Roenneberg, Till

    2016-01-01

    Sleep debt--together with circadian misalignment--is considered a central factor for adverse health outcomes associated with shift work. Here, we describe in detail sleep-wake behavior in a fast-forward rotating 12-h shift schedule, which involves at least 24 hours off after each shift and thus allows examining the role of immediate recovery after shift-specific sleep debt. Thirty-five participants at two chemical plants in Germany were chronotyped using the Munich ChronoType Questionnaire for Shift-Workers (MCTQ(Shift)) and wore actimeters throughout the two-week study period. From these actimetry recordings, we computed sleep and nap duration, social jetlag (a measure of circadian misalignment), and the daily timing of activity and sleep (center of gravity and mid-sleep, respectively). We observed that the long off-work periods between each shift create a fast alternation between shortened (mean ± standard deviation, 5h 17min ± 56min) and extended (8h 25min ± 72min) sleep episodes resulting in immanent reductions of sleep debt. Additionally, extensive napping of early chronotypes (up to 3 hours before the night shift) statistically compensated short sleep durations after the night shift. Partial rank correlations showed chronotype-dependent patterns of sleep and activity that were similar to those previously described in 8-h schedules; however, sleep before the day shift did not differ between chronotypes. Our findings indicate that schedules preventing a build-up of chronic sleep debt may reduce detrimental effects of shift work irrespective of shift duration. Prospective studies are needed to further elucidate the relationship between sleep, the circadian system, and health and safety hazards.

  20. Block Scheduling in High Schools.

    ERIC Educational Resources Information Center

    Irmsher, Karen

    1996-01-01

    Block Scheduling has been considered a cure for a lengthy list of educational problems. This report reviews the literature on block schedules and describes some Oregon high schools that have integrated block scheduling. Major disadvantages included resistance to change and requirements that teachers change their teaching strategies. There is…

  1. COMPASS: An Ada based scheduler

    NASA Technical Reports Server (NTRS)

    Mcmahon, Mary Beth; Culbert, Chris

    1992-01-01

    COMPASS is a generic scheduling system developed by McDonnell Douglas and funded by the Software Technology Branch of NASA Johnson Space Center. The motivation behind COMPASS is to illustrate scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to DOD standards. COMPASS has some unique characteristics that distinguishes it from commercial products. This paper discusses these characteristics and uses them to illustrate some differences between scheduling tools.

  2. Pre-Scheduled and Self Organized Sleep-Scheduling Algorithms for Efficient K-Coverage in Wireless Sensor Networks

    PubMed Central

    Hwang, I-Shyan

    2017-01-01

    The K-coverage configuration that guarantees coverage of each location by at least K sensors is highly popular and is extensively used to monitor diversified applications in wireless sensor networks. Long network lifetime and high detection quality are the essentials of such K-covered sleep-scheduling algorithms. However, the existing sleep-scheduling algorithms either cause high cost or cannot preserve the detection quality effectively. In this paper, the Pre-Scheduling-based K-coverage Group Scheduling (PSKGS) and Self-Organized K-coverage Scheduling (SKS) algorithms are proposed to settle the problems in the existing sleep-scheduling algorithms. Simulation results show that our pre-scheduled-based KGS approach enhances the detection quality and network lifetime, whereas the self-organized-based SKS algorithm minimizes the computation and communication cost of the nodes and thereby is energy efficient. Besides, SKS outperforms PSKGS in terms of network lifetime and detection quality as it is self-organized. PMID:29257078

  3. Comparison of Two Watch Schedules for Personnel at the White House Military Office President's Emergency Operations Center.

    PubMed

    Shattuck, Nita Lewis; Matsangas, Panagiotis; Eriksen, Elke; Kulubis, Spiros

    2015-08-01

    The aim of this study was to assess effectiveness of an alternative, 24-hr-on/72-hr-off watchstanding schedule on sleep and morale of personnel assigned to the President's Emergency Operations Center (PEOC). As part of the White House Military Office, PEOC personnel historically worked a 12-hr "Panama" watch schedule. Personnel reported experiencing chronic insufficient and disrupted sleep patterns and sought advice for improving their watchstanding schedule. Participants (N = 14 active-duty military members, ages 29 to 42 years) completed the Profile of Mood State (POMS) three times: before, during, and after switching to the alternative schedule with 5-hr sleep periods built into their workday. Participants completed a poststudy questionnaire to assess individual schedule preferences. Sleep was measured actigraphically, supplemented by activity logs. As indicated by POMS scores, mood improved significantly on the new schedule. Although average total sleep amount did not change substantively, the timing of sleep was more consistent on the new schedule, resulting in better sleep hygiene. PEOC personnel overwhelmingly preferred the new schedule, reporting not only that they felt more rested but that the new schedule was more conducive to the demands of family life. Demands of family life and time spent commuting were found to be critical factors for acceptance of the alternative schedule. This new schedule will be most effective if personnel adhere to the scheduled rest periods assigned during their 24-hr duty. A successful schedule should avoid conflicts between social life and operational demands. Results may lead to changes in the work schedules of other departments with similar 24/7 responsibilities. © 2015, Human Factors and Ergonomics Society.

  4. Instant Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  5. INTRODUCTION TO THE USE OF THE COPING ANALYSIS SCHEDULE FOR EDUCATIONAL SETTINGS (CASES) AND THE SPAULDING TEACHER ACTIVITY RATING SCHEDULE (STARS).

    ERIC Educational Resources Information Center

    SPAULDING, ROBERT L.

    THIS BOOKLET INTRODUCES TWO MEASUREMENT INSTRUMENTS FOCUSING ON CLASS MANAGEMENT. THE COPING ANALYSIS SCHEDULE FOR EDUCATIONAL SETTINGS PERMITS THE CODIFICATION OF ALL OPERANT BEHAVIOR OBSERVED IN THE CLASSROOM, INTO ONE OF THIRTEEN CATEGORIES. ALL BUT ONE OF THE THIRTEEN CATEGORIES ARE DESIGNED TO CHARACTERIZE THE CHILD'S ECONOMY WITH THE…

  6. Prioritizing sleep for healthy work schedules.

    PubMed

    Takahashi, Masaya

    2012-03-13

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  7. Prioritizing sleep for healthy work schedules

    PubMed Central

    2012-01-01

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules. PMID:22738292

  8. Bringing Person-Centeredness and Active Involvement into Reality

    ERIC Educational Resources Information Center

    Torenholt, Rikke; Engelund, Gitte; Willaing, Ingrid

    2015-01-01

    Purpose: The purpose of this paper is to examine the use and applicability of cultural probes--an explorative participatory method to gain insights into a person's life and thoughts--to achieve person-centeredness and active involvement in self-management education for people with chronic illness. Design/methodology/approach: An education toolkit…

  9. Daily Routines and Crime: Using Routine Activities as Measures of Hirschi's Involvement.

    ERIC Educational Resources Information Center

    Hawdon, James E.

    1999-01-01

    Reconstitutes the "involvement" aspect of T. Hirschi's bond theory to substitute routine-activity patterns (RAPs) for involvement. Self-reports of 108 college freshmen suggest that involvement reconstituted as RAPs is an effective predictor of minor acts of delinquency. (SLD)

  10. Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.

    PubMed

    Pérez-Padilla, Angeles; Pellón, Ricardo

    2003-05-01

    d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.

  11. 40 CFR 13.5 - Claims involving criminal activities or misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... misconduct. 13.5 Section 13.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CLAIMS COLLECTION STANDARDS General § 13.5 Claims involving criminal activities or misconduct. (a) The Administrator will refer cases of suspected criminal activity or misconduct to the EPA Office of Inspector General...

  12. 40 CFR 13.5 - Claims involving criminal activities or misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... misconduct. 13.5 Section 13.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CLAIMS COLLECTION STANDARDS General § 13.5 Claims involving criminal activities or misconduct. (a) The Administrator will refer cases of suspected criminal activity or misconduct to the EPA Office of Inspector General...

  13. 40 CFR 13.5 - Claims involving criminal activities or misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... misconduct. 13.5 Section 13.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CLAIMS COLLECTION STANDARDS General § 13.5 Claims involving criminal activities or misconduct. (a) The Administrator will refer cases of suspected criminal activity or misconduct to the EPA Office of Inspector General...

  14. 40 CFR 13.5 - Claims involving criminal activities or misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... misconduct. 13.5 Section 13.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CLAIMS COLLECTION STANDARDS General § 13.5 Claims involving criminal activities or misconduct. (a) The Administrator will refer cases of suspected criminal activity or misconduct to the EPA Office of Inspector General...

  15. 40 CFR 13.5 - Claims involving criminal activities or misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... misconduct. 13.5 Section 13.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CLAIMS COLLECTION STANDARDS General § 13.5 Claims involving criminal activities or misconduct. (a) The Administrator will refer cases of suspected criminal activity or misconduct to the EPA Office of Inspector General...

  16. Playing Goffman's Information Game: A Classroom Activity Involving Student Interactions

    ERIC Educational Resources Information Center

    McCoy, Charles Allan

    2017-01-01

    Goffman's dramaturgical approach is frequently used to introduce undergraduate students to the sociological understanding of human interaction. While a number of scholars have designed engaging student activities that highlight Goffman's approach, most of these activities tend to involve atypical embarrassing interactions or norm-breaking…

  17. Flexible Scheduling to Fit the Firefighters.

    ERIC Educational Resources Information Center

    Cox, Clarice Robinson

    Three flexible scheduling plans were tried in order that firefighters could take regular college courses despite their 24 hours on the 24 off work schedule. Plan one scheduled the firefighters into a regular Monday-Wednesday-Friday class which they attended every other week, making up missed material outside of class. Plan two scheduled special…

  18. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  19. TH-302, a hypoxia-activated prodrug with broad in vivo preclinical combination therapy efficacy: optimization of dosing regimens and schedules.

    PubMed

    Liu, Qian; Sun, Jessica D; Wang, Jingli; Ahluwalia, Dharmendra; Baker, Amanda F; Cranmer, Lee D; Ferraro, Damien; Wang, Yan; Duan, Jian-Xin; Ammons, W Steve; Curd, John G; Matteucci, Mark D; Hart, Charles P

    2012-06-01

    Subregional hypoxia is a common feature of tumors and is recognized as a limiting factor for the success of radiotherapy and chemotherapy. TH-302, a hypoxia-activated prodrug selectively targeting hypoxic regions of solid tumors, delivers a cytotoxic warhead to the tumor, while maintaining relatively low systemic toxicity. The antitumor activity, different dosing sequences, and dosing regimens of TH-302 in combination with commonly used conventional chemotherapeutics were investigated in human tumor xenograft models. Seven chemotherapeutic drugs (docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide) were tested in combination with TH-302 in eleven human xenograft models, including non-small cell lung cancer (NSCLC), colon cancer, prostate cancer, fibrosarcoma, melanoma, and pancreatic cancer. The antitumor activity of docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide was increased when combined with TH-302 in nine out of eleven models tested. Administration of TH-302 2-8 h prior to the other chemotherapeutics yielded superior efficacy versus other sequences tested. Simultaneous administration of TH-302 and chemotherapeutics increased toxicity versus schedules with dosing separations. In a dosing optimization study, TH-302 administered daily at 50 mg/kg intraperitoneally for 5 days per week in the H460 NSCLC model showed the optimal response with minimal toxicity. TH-302 enhances the activity of a wide range of conventional anti-neoplastic agents in a broad panel of in vivo xenograft models. These data highlight in vivo effects of schedule and order of drug administration in regimen efficacy and toxicity and have relevance to the design of human regimens incorporating TH-302.

  20. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  1. State Alternative Work Schedule Manual.

    ERIC Educational Resources Information Center

    Long, Marion C.; Post, Susan W.

    During recent years, there has been increasing interest within both the public and private sectors in the use of alternative work schedules. While a sizable body of literature exists on the use of work scheduling variations among private employers, there is a dearth of information concerning the extent and impact of alternative work schedules in…

  2. A Practical Variation of a Multiple-Schedule Procedure: Brief Schedule-Correlated Stimuli

    ERIC Educational Resources Information Center

    Tiger, Jeffrey H.; Hanley, Gregory P.; Larsen, Kylie M.

    2008-01-01

    Multiple schedules using continuous discriminative stimuli have been used to minimize children's disruptive requesting for teacher attention (e.g., colored floral leis; Tiger & Hanley, 2004; Tiger, Hanley, & Heal, 2006). The present study evaluated the effectiveness of, and children's preferences for, two multiple-schedule arrangements in which…

  3. Involving Working Parents in Child Care.

    ERIC Educational Resources Information Center

    Lombardi, Joan

    1995-01-01

    Notes that working parents of preschoolers find it difficult to schedule time for direct involvement in their child's education or care program without special arrangements with employers, who frequently are unwilling to make arrangements. Presents ways schools or centers can create a community climate in which employers are encouraged and…

  4. Effects of a Photo Activity Schedule Book on Independent Task Changes by Students with Intellectual Disabilities in Community and School Job Sites

    ERIC Educational Resources Information Center

    Carson, Keyla D; Gast, David L.; Ayres, Kevin M.

    2008-01-01

    The purpose of this study was to evaluate the effectiveness of using a photo activity schedule book to increase independent transitioning between vocational tasks inside a school cafeteria and at a community job site. Three students with mild to moderate intellectual disabilities, enrolled in a self-contained classroom in a public high school,…

  5. Pharmacists correcting schedule II prescriptions: DEA flip-flops continue.

    PubMed

    Abood, Richard R

    2010-12-01

    The Drug Enforcement Administration (DEA) has in recent years engaged in flip-flopping over important policy decisions. The most recent example involved whether a pharmacist can correct a written schedule II prescription upon verification with the prescriber. For several years the DEA's policy permitted this practice. Then the DEA issued a conflicting policy statement in 2007 in the preamble to the multiple schedule II prescription regulation, causing a series of subsequent contradictory statements ending with the policy that pharmacists should follow state law or policy until the Agency issues a regulation. It is doubtful that the DEA's opinion in the preamble would in itself constitute legal authority, or that the Agency would try to enforce the opinion. Nonetheless, these flip-flop opinions have confused pharmacists, caused some pharmacies to have claims rejected by third party payors, and most likely have inconvenienced patients.

  6. Distributed intelligent scheduling of FMS

    NASA Astrophysics Data System (ADS)

    Wu, Zuobao; Cheng, Yaodong; Pan, Xiaohong

    1995-08-01

    In this paper, a distributed scheduling approach of a flexible manufacturing system (FMS) is presented. A new class of Petri nets called networked time Petri nets (NTPN) for system modeling of networking environment is proposed. The distributed intelligent scheduling is implemented by three schedulers which combine NTPN models with expert system techniques. The simulation results are shown.

  7. Real-time scheduling using minimum search

    NASA Technical Reports Server (NTRS)

    Tadepalli, Prasad; Joshi, Varad

    1992-01-01

    In this paper we consider a simple model of real-time scheduling. We present a real-time scheduling system called RTS which is based on Korf's Minimin algorithm. Experimental results show that the schedule quality initially improves with the amount of look-ahead search and tapers off quickly. So it sppears that reasonably good schedules can be produced with a relatively shallow search.

  8. Empirical Evidence or Intuition? An Activity Involving the Scientific Method

    ERIC Educational Resources Information Center

    Overway, Ken

    2007-01-01

    Students need to have basic understanding of scientific method during their introductory science classes and for this purpose an activity was devised which involved a game based on famous Monty Hall game problem. This particular activity allowed students to banish or confirm their intuition based on empirical evidence.

  9. Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures

    NASA Astrophysics Data System (ADS)

    Toncovich, Adrián; Oliveros Colay, María José; Moreno, José María; Corral, Jiménez; Corral, Rafael

    2009-11-01

    Production planning and scheduling problems emphasize the need for the availability of management tools that can help to assure proper service levels to customers, maintaining, at the same time, the production costs at acceptable levels and maximizing the utilization of the production facilities. In this case, a production scheduling problem that arises in the context of the activities of a company dedicated to the manufacturing of furniture for children and teenagers is addressed. Two bicriteria metaheuristic procedures are proposed to solve the sequencing problem in a production equipment that constitutes the bottleneck of the production process of the company. The production scheduling problem can be characterized as a general flow shop with sequence dependant setup times and additional inventory constraints. Two objectives are simultaneously taken into account when the quality of the candidate solutions is evaluated: the minimization of completion time of all jobs, or makespan, and the minimization of the total flow time of all jobs. Both procedures are based on a local search strategy that responds to the structure of the simulated annealing metaheuristic. In this case, both metaheuristic approaches generate a set of solutions that provides an approximation to the optimal Pareto front. In order to evaluate the performance of the proposed techniques a series of experiments was conducted. After analyzing the results, it can be said that the solutions provided by both approaches are adequate from the viewpoint of the quality as well as the computational effort involved in their generation. Nevertheless, a further refinement of the proposed procedures should be implemented with the aim of facilitating a quasi-automatic definition of the solution parameters.

  10. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  11. Conception of Self-Construction Production Scheduling System

    NASA Astrophysics Data System (ADS)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  12. Range Scheduling Aid (RSA)

    NASA Technical Reports Server (NTRS)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  13. Dosing Schedules for Pneumococcal Conjugate Vaccine

    PubMed Central

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059

  14. Application of multiobjective optimization to scheduling capacity expansion of urban water resource systems

    NASA Astrophysics Data System (ADS)

    Mortazavi-Naeini, Mohammad; Kuczera, George; Cui, Lijie

    2014-06-01

    Significant population increase in urban areas is likely to result in a deterioration of drought security and level of service provided by urban water resource systems. One way to cope with this is to optimally schedule the expansion of system resources. However, the high capital costs and environmental impacts associated with expanding or building major water infrastructure warrant the investigation of scheduling system operational options such as reservoir operating rules, demand reduction policies, and drought contingency plans, as a way of delaying or avoiding the expansion of water supply infrastructure. Traditionally, minimizing cost has been considered the primary objective in scheduling capacity expansion problems. In this paper, we consider some of the drawbacks of this approach. It is shown that there is no guarantee that the social burden of coping with drought emergencies is shared equitably across planning stages. In addition, it is shown that previous approaches do not adequately exploit the benefits of joint optimization of operational and infrastructure options and do not adequately address the need for the high level of drought security expected for urban systems. To address these shortcomings, a new multiobjective optimization approach to scheduling capacity expansion in an urban water resource system is presented and illustrated in a case study involving the bulk water supply system for Canberra. The results show that the multiobjective approach can address the temporal equity issue of sharing the burden of drought emergencies and that joint optimization of operational and infrastructure options can provide solutions superior to those just involving infrastructure options.

  15. Parallel-aware, dedicated job co-scheduling within/across symmetric multiprocessing nodes

    DOEpatents

    Jones, Terry R.; Watson, Pythagoras C.; Tuel, William; Brenner, Larry; ,Caffrey, Patrick; Fier, Jeffrey

    2010-10-05

    In a parallel computing environment comprising a network of SMP nodes each having at least one processor, a parallel-aware co-scheduling method and system for improving the performance and scalability of a dedicated parallel job having synchronizing collective operations. The method and system uses a global co-scheduler and an operating system kernel dispatcher adapted to coordinate interfering system and daemon activities on a node and across nodes to promote intra-node and inter-node overlap of said interfering system and daemon activities as well as intra-node and inter-node overlap of said synchronizing collective operations. In this manner, the impact of random short-lived interruptions, such as timer-decrement processing and periodic daemon activity, on synchronizing collective operations is minimized on large processor-count SPMD bulk-synchronous programming styles.

  16. Design and implementation of an experiment scheduling system for the ACTS satellite

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1994-01-01

    The Advanced Communication Technology Satellite (ACTS) was launched on the 12th of September 1993 aboard STS-51. All events since that time have proceeded as planned with user operations commencing on December 6th, 1993. ACTS is a geosynchronous satellite designed to extend the state of the art in communication satellite design and is available to experimenters on a 'time/bandwidth available' basis. The ACTS satellite requires the advance scheduling of experimental activities based upon a complex set of resource, state, and activity constraints in order to ensure smooth operations. This paper describes the software system developed to schedule experiments for ACTS.

  17. An evaluation of multiple-schedule variations to reduce high-rate requests in the picture exchange communication system.

    PubMed

    Landa, Robin; Hanley, Gregory P

    2016-06-01

    Using procedures similar to those of Tiger, Hanley, and Heal (2006), we compared two multiple-schedule variations (S+/S- and S+ only) to treat high-rate requests for edible items in the Picture Exchange Communication System (PECS). Two individuals with autism participated, after they showed persistent requests for edible items after PECS training. Stimulus control was achieved only with the multiple schedule that involved presentation of a discriminative stimulus during reinforcement components and its removal during extinction components (S+ only). Discriminated requests were maintained for the 1 participant who experienced schedule thinning. © 2016 Society for the Experimental Analysis of Behavior.

  18. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  19. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  20. 77 FR 63766 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration 21 CFR Part 1308 [Docket No. DEA-357] Schedules of Controlled Substances: Placement of Methylone Into Schedule I AGENCY: Drug Enforcement Administration, Department of Justice. ACTION: Notice of proposed rulemaking. SUMMARY: The Drug Enforcement...

  1. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  2. User requirements for a patient scheduling system

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.

    1979-01-01

    A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

  3. Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care

    PubMed Central

    Kossek, Ellen Ernst; Piszczek, Matthew M.; Mcalpine, Kristie L.; Hammer, Leslie B.; Burke, Lisa

    2016-01-01

    Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they “fill holes” to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers. PMID:27721517

  4. A heuristic approach to incremental and reactive scheduling

    NASA Technical Reports Server (NTRS)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  5. Incorporating Active Runway Crossings in Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2010-01-01

    A mixed integer linear program is presented for deterministically scheduling departure and ar rival aircraft at airport runways. This method addresses different schemes of managing the departure queuing area by treating it as first-in-first-out queues or as a simple par king area where any available aircraft can take-off ir respective of its relative sequence with others. In addition, this method explicitly considers separation criteria between successive aircraft and also incorporates an optional prioritization scheme using time windows. Multiple objectives pertaining to throughput and system delay are used independently. Results indicate improvement over a basic first-come-first-serve rule in both system delay and throughput. Minimizing system delay results in small deviations from optimal throughput, whereas minimizing throughput results in large deviations in system delay. Enhancements for computational efficiency are also presented in the form of reformulating certain constraints and defining additional inequalities for better bounds.

  6. Scheduling from the perspective of the application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berman, F.; Wolski, R.

    1996-12-31

    Metacomputing is the aggregation of distributed and high-performance resources on coordinated networks. With careful scheduling, resource-intensive applications can be implemented efficiently on metacomputing systems at the sizes of interest to developers and users. In this paper we focus on the problem of scheduling applications on metacomputing systems. We introduce the concept of application-centric scheduling in which everything about the system is evaluated in terms of its impact on the application. Application-centric scheduling is used by virtually all metacomputer programmers to achieve performance on metacomputing systems. We describe two successful metacomputing applications to illustrate this approach, and describe AppLeS scheduling agentsmore » which generalize the application-centric scheduling approach. Finally, we show preliminary results which compare AppLeS-derived schedules with conventional strip and blocked schedules for a two-dimensional Jacobi code.« less

  7. Constraint-Based Scheduling System

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Eskey, Megan; Stock, Todd; Taylor, Will; Kanefsky, Bob; Drascher, Ellen; Deale, Michael; Daun, Brian; Davis, Gene

    1995-01-01

    Report describes continuing development of software for constraint-based scheduling system implemented eventually on massively parallel computer. Based on machine learning as means of improving scheduling. Designed to learn when to change search strategy by analyzing search progress and learning general conditions under which resource bottleneck occurs.

  8. Gain scheduling - Potential hazards and possible remedies

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.; Athans, Michael

    1991-01-01

    A common gain scheduling rule-of-thumb is to schedule on a slow variable. In this work, it is shown how current gain scheduling practice is necessarily limited to slow variations in the scheduling variable. These limitations are revealed to be consequences of fundamental control concepts. Furthermore, it is shown how a formulation of the gain scheduling procedure can lead toward ultimately removing these restrictions.

  9. 75 FR 8751 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ..., Administration on Aging (N1-439-09-2, 14 items, 14 temporary items). Schedules of daily activities and files of... Services, Administration on Aging (N1-439-09-4, 9 items, 8 temporary items). Master data files containing... associated with the death of active duty military personnel. Proposed for permanent retention are such...

  10. Health benefits of serious involvement in leisure activities among older Korean adults

    PubMed Central

    Kim, Junhyoung; Yamada, Naoko; Heo, Jinmoo; Han, Areum

    2014-01-01

    The existing literature suggests that serious engagement in leisure activities leads to happiness, life satisfaction, and successful aging among older adults. This qualitative study was used to examine the benefits of serious involvement in leisure activities among older Korean adults who were members of a sports club. Using an analytic data analysis, we identified three main themes associated with the benefits of serious engagement in leisure activities: 1) the experience of psychological benefits, 2) the creation of social support, and 3) the enhancement of physical health. These themes indicate that, through serious involvement in certain physical activities, participants gain various health benefits, which may contribute to successful aging. PMID:25059979

  11. Health benefits of serious involvement in leisure activities among older Korean adults.

    PubMed

    Kim, Junhyoung; Yamada, Naoko; Heo, Jinmoo; Han, Areum

    2014-01-01

    The existing literature suggests that serious engagement in leisure activities leads to happiness, life satisfaction, and successful aging among older adults. This qualitative study was used to examine the benefits of serious involvement in leisure activities among older Korean adults who were members of a sports club. Using an analytic data analysis, we identified three main themes associated with the benefits of serious engagement in leisure activities: 1) the experience of psychological benefits, 2) the creation of social support, and 3) the enhancement of physical health. These themes indicate that, through serious involvement in certain physical activities, participants gain various health benefits, which may contribute to successful aging.

  12. Product Use Scheduler: A Scheduling Module used in EPA’s Human Exposure Model

    EPA Science Inventory

    The scheduling model (SM) was developed for scheduling the use of consumer products in the U.S. EPA’s Human Exposure Model (HEM), an integrated modeling system to estimate human exposure to chemicals in household consumer products. The SM begins with year-long daily activit...

  13. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  14. TH-302, a hypoxia-activated prodrug with broad in vivo preclinical combination therapy efficacy: optimization of dosing regimens and schedules

    PubMed Central

    Liu, Qian; Sun, Jessica D.; Wang, Jingli; Ahluwalia, Dharmendra; Baker, Amanda F.; Cranmer, Lee D.; Ferraro, Damien; Wang, Yan; Duan, Jian-Xin; Ammons, W. Steve; Curd, John G.; Matteucci, Mark D.

    2014-01-01

    Purpose Subregional hypoxia is a common feature of tumors and is recognized as a limiting factor for the success of radiotherapy and chemotherapy. TH-302, a hypoxia-activated prodrug selectively targeting hypoxic regions of solid tumors, delivers a cytotoxic warhead to the tumor, while maintaining relatively low systemic toxicity. The antitumor activity, different dosing sequences, and dosing regimens of TH-302 in combination with commonly used conventional chemotherapeutics were investigated in human tumor xenograft models. Methods Seven chemotherapeutic drugs (docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide) were tested in combination with TH-302 in eleven human xenograft models, including non-small cell lung cancer (NSCLC), colon cancer, prostate cancer, fibrosarcoma, melanoma, and pancreatic cancer. Results The antitumor activity of docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide was increased when combined with TH-302 in nine out of eleven models tested. Administration of TH-302 2–8 h prior to the other chemotherapeutics yielded superior efficacy versus other sequences tested. Simultaneous administration of TH-302 and chemotherapeutics increased toxicity versus schedules with dosing separations. In a dosing optimization study, TH-302 administered daily at 50 mg/kg intraperitoneally for 5 days per week in the H460 NSCLC model showed the optimal response with minimal toxicity. Conclusions TH-302 enhances the activity of a wide range of conventional anti-neoplastic agents in a broad panel of in vivo xenograft models. These data highlight in vivo effects of schedule and order of drug administration in regimen efficacy and toxicity and have relevance to the design of human regimens incorporating TH-302. PMID:22382881

  15. Examining the Relationship between Class Scheduling and Student Achievement in College Algebra

    ERIC Educational Resources Information Center

    Gallo, Michael A.; Odu, Michael

    2009-01-01

    This study examines the relationship between scheduling (3-, 2-, and 1-day-per-week classes) and achievement in college algebra. The study is grounded in spacing effect theory, which examines how variations in the frequency and timing of instruction affect student learning, and involves 116 Florida community college students. Regression analyses…

  16. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities Exported...

  17. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities Exported...

  18. A short-term operating room surgery scheduling problem integrating multiple nurses roster constraints.

    PubMed

    Xiang, Wei; Yin, Jiao; Lim, Gino

    2015-02-01

    Operating room (OR) surgery scheduling determines the individual surgery's operation start time and assigns the required resources to each surgery over a schedule period, considering several constraints related to a complete surgery flow and the multiple resources involved. This task plays a decisive role in providing timely treatments for the patients while balancing hospital resource utilization. The originality of the present study is to integrate the surgery scheduling problem with real-life nurse roster constraints such as their role, specialty, qualification and availability. This article proposes a mathematical model and an ant colony optimization (ACO) approach to efficiently solve such surgery scheduling problems. A modified ACO algorithm with a two-level ant graph model is developed to solve such combinatorial optimization problems because of its computational complexity. The outer ant graph represents surgeries, while the inner graph is a dynamic resource graph. Three types of pheromones, i.e. sequence-related, surgery-related, and resource-related pheromone, fitting for a two-level model are defined. The iteration-best and feasible update strategy and local pheromone update rules are adopted to emphasize the information related to the good solution in makespan, and the balanced utilization of resources as well. The performance of the proposed ACO algorithm is then evaluated using the test cases from (1) the published literature data with complete nurse roster constraints, and 2) the real data collected from a hospital in China. The scheduling results using the proposed ACO approach are compared with the test case from both the literature and the real life hospital scheduling. Comparison results with the literature shows that the proposed ACO approach has (1) an 1.5-h reduction in end time; (2) a reduction in variation of resources' working time, i.e. 25% for ORs, 50% for nurses in shift 1 and 86% for nurses in shift 2; (3) an 0.25h reduction in

  19. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance.

    PubMed

    Carter, Christine E; Grahn, Jessica A

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the "contextual interference effect." While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  20. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance

    PubMed Central

    Carter, Christine E.; Grahn, Jessica A.

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the “contextual interference effect.” While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  1. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  2. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    PubMed

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  3. Applying Dynamic Priority Scheduling Scheme to Static Systems of Pinwheel Task Model in Power-Aware Scheduling

    PubMed Central

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10–80% over the existing algorithms. PMID:25121126

  4. PLAN-IT-2: The next generation planning and scheduling tool

    NASA Technical Reports Server (NTRS)

    Eggemeyer, William C.; Cruz, Jennifer W.

    1990-01-01

    PLAN-IT is a scheduling program which has been demonstrated and evaluated in a variety of scheduling domains. The capability enhancements being made for the next generation of PLAN-IT, called PLAN-IT-2 is discussed. PLAN-IT-2 represents a complete rewrite of the original PLAN-IT incorporating major changes as suggested by the application experiences with the original PLAN-IT. A few of the enhancements described are additional types of constraints, such as states and resettable-depletables (batteries), dependencies between constraints, multiple levels of activity planning during the scheduling process, pattern constraint searching for opportunities as opposed to just minimizing the amount of conflicts, additional customization construction features for display and handling of diverse multiple time systems, and reduction in both the size and the complexity for creating the knowledge-base to address the different problem domains.

  5. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    USGS Publications Warehouse

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  6. Production scheduling with ant colony optimization

    NASA Astrophysics Data System (ADS)

    Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu

    2017-10-01

    The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.

  7. Artificial intelligence approaches to astronomical observation scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  8. Understanding Activity Engagement Across Weekdays and Weekend Days: A Multivariate Multiple Discrete-Continuous Modeling Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garikapati, Venu; Astroza, Sebastian; Bhat, Prerna C.

    This paper is motivated by the increasing recognition that modeling activity-travel demand for a single day of the week, as is done in virtually all travel forecasting models, may be inadequate in capturing underlying processes that govern activity-travel scheduling behavior. The considerable variability in daily travel suggests that there are important complementary relationships and competing tradeoffs involved in scheduling and allocating time to various activities across days of the week. Both limited survey data availability and methodological challenges in modeling week-long activity-travel schedules have precluded the development of multi-day activity-travel demand models. With passive and technology-based data collection methods increasinglymore » in vogue, the collection of multi-day travel data may become increasingly commonplace in the years ahead. This paper addresses the methodological challenge associated with modeling multi-day activity-travel demand by formulating a multivariate multiple discrete-continuous probit (MDCP) model system. The comprehensive framework ties together two MDCP model components, one corresponding to weekday time allocation and the other to weekend activity-time allocation. By tying the two MDCP components together, the model system also captures relationships in activity-time allocation between weekdays on the one hand and weekend days on the other. Model estimation on a week-long travel diary data set from the United Kingdom shows that there are significant inter-relationships between weekdays and weekend days in activity-travel scheduling behavior. The model system presented in this paper may serve as a higher-level multi-day activity scheduler in conjunction with existing daily activity-based travel models.« less

  9. Understanding Medication Schedules: Do Pictograms Help?

    PubMed

    Leong, Madeline; Tam, Vernissia; Xu, Timothy; Peters, Matthew

    2018-06-01

    Previous studies suggest that pictograms may improve patients' understanding of medication schedules. Understanding a medication schedule is a necessary first step for medication adherence. This study aimed to determine if pictograms improved patients' ability to correctly fill a pillbox. This is a randomized, controlled, crossover pilot study. This study involves 30 patients on the medical wards of an urban, tertiary care center. The PillBox Test required participants to fill a 7-day pillbox with pill-sized colored beads. Participants were randomized to either the control or the experimental condition first. In the control condition, a standard pillbox was used with text instructions on the pill bottles. In the experimental condition, a pictogram pillbox was used with text and pictogram instructions on the pill bottles. There was no significant difference in passing on text or pictogram PillBox Test based on the order of group administration. However, 77% of participants reported that pictograms helped them understand medication instructions, 67% of participants preferred pictograms, and 93% felt pictograms should be used on all medication labels. In this pilot study, the use of pictograms did not significantly improve participants' ability to correctly fill a pillbox. However, most participants preferred pictograms to text labels. Further research is needed to determine the efficacy of pictograms in specific populations.

  10. Explanation of Registration Review Schedule

    EPA Pesticide Factsheets

    Updated information on EPA's schedule for opening dockets to begin pesticide registration reviews during the next several years. The schedule is subdivided into conventional pesticides, antimicrobials, biochemicals, and microbials.

  11. Practice schedule and acquisition, retention, and transfer of a throwing task in 6-yr.-old children.

    PubMed

    Granda Vera, Juan; Montilla, Mariano Medina

    2003-06-01

    Earlier studies have raised questions about the usefulness of variable and random practice in learning motor tasks so this study was designed to investigate the effects of contextual interference in young children, and specifically to evaluate the effectiveness of variable or random practice structure in 6-yr.-old boys and girls. Participants on a variable practice schedule showed better performances than those on a blocked schedule. The differences between the two groups were significant in the acquisition, retention, and transfer phases. These results support the hypothesis that contextual interference enhances skill learning. Because the study involved groups of young children in the setting of their normally scheduled physical education class, the practical applications of the results are evident.

  12. Alternative Work Schedules: Definitions

    ERIC Educational Resources Information Center

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  13. 40 CFR 52.1425 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1425 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1425 Compliance schedules. (a) The compliance schedules for the sources identified below are approved as revisions to the plan...

  14. Scheduling Real-Time Mixed-Criticality Jobs

    NASA Astrophysics Data System (ADS)

    Baruah, Sanjoy K.; Bonifaci, Vincenzo; D'Angelo, Gianlorenzo; Li, Haohan; Marchetti-Spaccamela, Alberto; Megow, Nicole; Stougie, Leen

    Many safety-critical embedded systems are subject to certification requirements; some systems may be required to meet multiple sets of certification requirements, from different certification authorities. Certification requirements in such "mixed-criticality" systems give rise to interesting scheduling problems, that cannot be satisfactorily addressed using techniques from conventional scheduling theory. In this paper, we study a formal model for representing such mixed-criticality workloads. We demonstrate first the intractability of determining whether a system specified in this model can be scheduled to meet all its certification requirements, even for systems subject to two sets of certification requirements. Then we quantify, via the metric of processor speedup factor, the effectiveness of two techniques, reservation-based scheduling and priority-based scheduling, that are widely used in scheduling such mixed-criticality systems, showing that the latter of the two is superior to the former. We also show that the speedup factors are tight for these two techniques.

  15. Development of Watch Schedule Using Rules Approach

    NASA Astrophysics Data System (ADS)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  16. Male involvement in child care activities: a review of the literature in Botswana.

    PubMed

    Jorosi-Tshiamo, Wananani B; Mogobe, Keitshokile D; Mokotedi, Mosidi T

    2013-12-01

    Engaging men as partners in childrearing is critical because of the positive aspects on the child's development and reduction of childhood illnesses. The paper presents findings from a literature review whose aim was to assess the extent to which males are involved in child care activities. Findings revealed a limited number of studies conducted in the area of male involvement. Sociocultural factors have a negative influence on men's participation on child care activities. In addition, some laws were prohibitive to male involvement. It was difficult to assess the extent to which males were involved due to inadequate data collection tools. Recommendations include a study on male involvement, review of the existing Sexual and Reproductive Health data collection tools, development of a policy on paternity leave, strengthening training on male involvement; community sensitization on cultural stereotypes and harmonization of customary and common laws.

  17. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  18. Technology for planning and scheduling under complex constraints

    NASA Astrophysics Data System (ADS)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  19. CHMICA and MDMB-FUBINACA) Into Schedule I. Notice of Intent.

    PubMed

    2016-12-21

    The Administrator of the Drug Enforcement Administration is issuing this notice of intent to temporarily schedule six synthetic cannabinoids: methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [5F-ADB; 5F-MDMB-PINACA]; methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3-methylbutanoate [5F-AMB]; N-(adamantan-1-yl)-1-(5-fluoropentyl)-1H-indazole-3-carboxamide [5F-APINACA, 5F-AKB48]; N-(1-amino-3,3-dimethyl-1-oxobutan-2-yl)-1-(4-fluorobenzyl)-1H-indazole-3-carboxamide [ADB-FUBINACA]; methyl 2-(1-(cyclohexylmethyl)-1H-indole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-CHMICA, MMB-CHMINACA] and methyl 2-(1-(4-fluorobenzyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-FUBINACA], into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act (CSA). This action is based on a finding by the Administrator that the placement of these synthetic cannabinoids into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. Any final order will impose the administrative, civil, and criminal sanctions and regulatory controls applicable to schedule I substances under the Controlled Substances Act on the manufacture, distribution, possession, importation, exportation of, and research and conduct with, instructional activities of these synthetic cannabinoids.

  20. Registration Review Docket Opening Schedule

    EPA Pesticide Factsheets

    Dockets are opened on a fiscal year schedule for reevaluation of all pesticides. They are subdivided into conventional pesticides, antimicrobials, biochemicals, and microbials. The schedules for 2014 to 2017 are attached.

  1. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; hide

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  2. 12 CFR 229.12 - Availability schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Availability schedule. 229.12 Section 229.12 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM... Availability Policies § 229.12 Availability schedule. (a) Effective date. The availability schedule contained...

  3. 40 CFR 52.1335 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1335 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Missouri § 52.1335 Compliance schedules. (a) The compliance schedule for the source identified below is approved as a revision to the plan pursuant...

  4. Regrouping: organized activity involvement and social adjustment across the transition to high school.

    PubMed

    Bohnert, Amy M; Aikins, Julie Wargo; Arola, Nicole T

    2013-01-01

    Although organized activities (OAs) have been established as important contexts of development, limited work has examined the role of OAs across the high school transition in buffering adolescents' social adjustment by providing opportunities for visibility and peer affiliation. The transition to high school is characterized by numerous changes and OAs may provide an important setting for establishing and maintaining peer relationships during this tumultuous time. This study included 151 8th grade U.S. students (58% male) who were assessed across the transition to high school (spring of 8th and 9th grade). Continuous involvement in academic activities across the transition and becoming involved (i.e., initiation) in community/service activities following the transition was associated with fewer depressive symptoms in the spring of 9th grade. Continuous involvement in sports and initiation of academic activities was associated with having more friendships. In addition, links between OAs and loneliness were only evident among females. There appear to be significant social benefits for OA involvement. Copyright © 2013 Wiley Periodicals, Inc., A Wiley Company.

  5. Binary Trees and Parallel Scheduling Algorithms.

    DTIC Science & Technology

    1980-09-01

    been pro- cessed for p. time units. If a job does not complete by its due time, it is tardy. In a nonpreemptive schedule, job i is scheduled to process...the preemptive schedule obtained by the algorithm of section 2.1.2 also minimizes 5Ti, this problem is easily solved in parallel. When lci is to e...August 1978, pp. 657-661. 14. Horn, W. A., "Some simple scheduling algorithms," Naval Res. Logist . Qur., Vol. 21, pp. 177-185, 1974. i5. Hforowitz, E

  6. Emergency response nurse scheduling with medical support robot by multi-agent and fuzzy technique.

    PubMed

    Kono, Shinya; Kitamura, Akira

    2015-08-01

    In this paper, a new co-operative re-scheduling method corresponding the medical support tasks that the time of occurrence can not be predicted is described, assuming robot can co-operate medical activities with the nurse. Here, Multi-Agent-System (MAS) is used for the co-operative re-scheduling, in which Fuzzy-Contract-Net (FCN) is applied to the robots task assignment for the emergency tasks. As the simulation results, it is confirmed that the re-scheduling results by the proposed method can keep the patients satisfaction and decrease the work load of the nurse.

  7. Trimester Schedule. Research Brief

    ERIC Educational Resources Information Center

    Education Partnerships, Inc., 2012

    2012-01-01

    Why do a trimester schedule? With the advent of block scheduling, many high schools conducted research on utilizing that plan in a trimester format. There appeared to be three issues that most schools faced: (1) How to provide substantive instructional time that was not fragmented?; (2) How does the school climate contribute positively to…

  8. Which resources moderate the effects of demanding work schedules on nurses working in residential elder care? A longitudinal study.

    PubMed

    Peters, Velibor; Houkes, Inge; de Rijk, Angelique E; Bohle, Philip L; Engels, Josephine A; Nijhuis, Frans J N

    2016-06-01

    Shiftwork is a major job demand for nurses and has been related to various negative consequences. Research suggests that personal and job resources moderate the impact of work schedules on stress, health and well-being. This longitudinal study examined whether the interactions of personal and job resources with work schedule demands predicted work engagement and emotional exhaustion in nursing. This longitudinal study included two waves of data collection with a one year follow-up using self-report questionnaires among 247 nurses working shifts or irregular working hours in residential care for the elderly in the Netherlands. Moderated structural equation modelling was conducted to examine the interactions between personal and job resources and work schedule demands. Two work schedule demands were assessed: type of work schedule (demanding vs. less demanding) and average weekly working hours. Two personal resources, active coping and healthy lifestyle, and two job resources, work schedule control and the work schedule fit with nurses' private life, were assessed. Results showed that the work schedule fit with nurses' private life buffered the relationship between work schedule demands and emotional exhaustion one year later. Furthermore, the work schedule fit with nurses' private life increased work engagement one year later when work schedule demands were high. Work schedule control strengthened the positive relationship between work schedule demands and emotional exhaustion one year later. The personal resources, active coping and healthy lifestyle were no moderators in this model. Nurses suffer less from decreasing work engagement and emotional exhaustion due to work schedule demands when their work schedules fit with their private lives. Work schedule control did not buffer, but strengthened the positive relationship between weekly working hours and emotional exhaustion one year later. Job resources appeared to be more important for nurses' well-being than

  9. 19 CFR 162.45a - Summary forfeiture of Schedule I and Schedule II controlled substances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE....S.C. 965. Accordingly, in the case of a seizure of Schedule I or Schedule II controlled substances...

  10. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Sampling schedules. 141.702 Section... Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring under § 141.701 must submit a sampling schedule that specifies the calendar dates when the system will...

  11. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Sampling schedules. 141.702 Section... Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring under § 141.701 must submit a sampling schedule that specifies the calendar dates when the system will...

  12. Research on Scheduling Algorithm for Multi-satellite and Point Target Task on Swinging Mode

    NASA Astrophysics Data System (ADS)

    Wang, M.; Dai, G.; Peng, L.; Song, Z.; Chen, G.

    2012-12-01

    and negative swinging angle and the computation of time window are analyzed and discussed. And many strategies to improve the efficiency of this model are also put forward. In order to solve the model, we bring forward the conception of activity sequence map. By using the activity sequence map, the activity choice and the start time of the activity can be divided. We also bring forward three neighborhood operators to search the result space. The front movement remaining time and the back movement remaining time are used to analyze the feasibility to generate solution from neighborhood operators. Lastly, the algorithm to solve the problem and model is put forward based genetic algorithm. Population initialization, crossover operator, mutation operator, individual evaluation, collision decrease operator, select operator and collision elimination operator is designed in the paper. Finally, the scheduling result and the simulation for a practical example on 5 satellites and 100 point targets with swinging mode is given, and the scheduling performances are also analyzed while the swinging angle in 0, 5, 10, 15, 25. It can be shown by the result that the model and the algorithm are more effective than those ones without swinging mode.

  13. Adolescent Involvement in Extracurricular Activities: Influences on Leadership Skills

    ERIC Educational Resources Information Center

    Hancock, Donna; Dyk, Patricia Hyjer; Jones, Kenneth

    2012-01-01

    Study examined adolescents' participation in sports, school, and community extracurricular activities to assess the influence of different involvement roles and adult support on leadership skills. The study found that males and females who perceived their adult support more positively had more positive perceptions of their leadership skills.…

  14. The Effects of the Mars Exploration Rovers (MER) Work Schedule Regime on Locomotor Activity Circadian Rhythms, Sleep and Fatigue

    NASA Technical Reports Server (NTRS)

    DeRoshia, Charles W.; Colletti, Laura C.; Mallis, Melissa M.

    2008-01-01

    This study assessed human adaptation to a Mars sol by evaluating sleep metrics obtained by actigraphy and subjective responses in 22 participants, and circadian rhythmicity in locomotor activity in 9 participants assigned to Mars Exploration Rover (MER) operational work schedules (24.65 hour days) at the Jet Propulsion Laboratory in 2004. During MER operations, increased work shift durations and reduced sleep durations and time in bed were associated with the appearance of pronounced 12-hr (circasemidian) rhythms with reduced activity levels. Sleep duration, workload, and circadian rhythm stability have important implications for adaptability and maintenance of operational performance not only of MER operations personnel but also in space crews exposed to a Mars sol of 24.65 hours during future Mars missions.

  15. How to Build the Master Schedule in 10 Easy Steps: A Guide for Secondary School Administrators

    ERIC Educational Resources Information Center

    Kussin, Steven S.

    2007-01-01

    This book is an incredibly valuable resource to anyone involved in building a master schedule. The author provides a comprehensive description of the processes involved and makes the reader aware of what needs to be considered and done throughout the process. One of the most time-consuming tasks for school leaders is creating a master schedule…

  16. Using Common Graphics Paradigms Implemented in a Java Applet to Represent Complex Scheduling Requirements

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth

    1997-01-01

    The experiments planned for the International Space Station promise to be complex, lengthy and diverse. The scarcity of the space station resources will cause significant competition for resources between experiments. The scheduling job facing the Space Station mission planning software requires a concise and comprehensive description of the experiments' requirements (to ensure a valid schedule) and a good description of the experiments' flexibility (to effectively utilize available resources). In addition, the continuous operation of the station, the wide geographic dispersion of station users, and the budgetary pressure to reduce operations manpower make a low-cost solution mandatory. A graphical representation of the scheduling requirements for station payloads implemented via an Internet-based application promises to be an elegant solution that addresses all of these issues. The graphical representation of experiment requirements permits a station user to describe his experiment by defining "activities" and "sequences of activities". Activities define the resource requirements (with alternatives) and other quantitative constraints of tasks to be performed. Activities definitions use an "outline" graphics paradigm. Sequences define the time relationships between activities. Sequences may also define time relationships with activities of other payloads or space station systems. Sequences of activities are described by a "network" graphics paradigm. The bulk of this paper will describe the graphical approach to representing requirements and provide examples that show the ease and clarity with which complex requirements can be represented. A Java applet, to run in a web browser, is being developed to support the graphical representation of payload scheduling requirements. Implementing the entry and editing of requirements via the web solves the problems introduced by the geographic dispersion of users. Reducing manpower is accomplished by developing a concise

  17. Tool for Merging Proposals Into DSN Schedules

    NASA Technical Reports Server (NTRS)

    Khanampornpan, Teerapat; Kwok, John; Call, Jared

    2008-01-01

    A Practical Extraction and Reporting Language (Perl) script called merge7da has been developed to facilitate determination, by a project scheduler in NASA's Deep Space Network, of whether a proposal for use of the DSN could create a conflict with the current DSN schedule. Prior to the development of merge7da, there was no way to quickly identify potential schedule conflicts: it was necessary to submit a proposal and wait a day or two for a response from a DSN scheduling facility. By using merge7da to detect and eliminate potential schedule conflicts before submitting a proposal, a project scheduler saves time and gains assurance that the proposal will probably be accepted. merge7da accepts two input files, one of which contains the current DSN schedule and is in a DSN-standard format called '7da'. The other input file contains the proposal and is in another DSN-standard format called 'C1/C2'. merge7da processes the two input files to produce a merged 7da-format output file that represents the DSN schedule as it would be if the proposal were to be adopted. This 7da output file can be loaded into various DSN scheduling software tools now in use.

  18. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    NASA Technical Reports Server (NTRS)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  19. Integrated Dynamic Process Planning and Scheduling in Flexible Manufacturing Systems via Autonomous Agents

    NASA Astrophysics Data System (ADS)

    Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.

  20. Response Strength in Extreme Multiple Schedules

    ERIC Educational Resources Information Center

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  1. Nurse Scheduling by Cooperative GA with Effective Mutation Operator

    NASA Astrophysics Data System (ADS)

    Ohki, Makoto

    In this paper, we propose an effective mutation operators for Cooperative Genetic Algorithm (CGA) to be applied to a practical Nurse Scheduling Problem (NSP). The nurse scheduling is a very difficult task, because NSP is a complex combinatorial optimizing problem for which many requirements must be considered. In real hospitals, the schedule changes frequently. The changes of the shift schedule yields various problems, for example, a fall in the nursing level. We describe a technique of the reoptimization of the nurse schedule in response to a change. The conventional CGA is superior in ability for local search by means of its crossover operator, but often stagnates at the unfavorable situation because it is inferior to ability for global search. When the optimization stagnates for long generation cycle, a searching point, population in this case, would be caught in a wide local minimum area. To escape such local minimum area, small change in a population should be required. Based on such consideration, we propose a mutation operator activated depending on the optimization speed. When the optimization stagnates, in other words, when the optimization speed decreases, the mutation yields small changes in the population. Then the population is able to escape from a local minimum area by means of the mutation. However, this mutation operator requires two well-defined parameters. This means that user have to consider the value of these parameters carefully. To solve this problem, we propose a periodic mutation operator which has only one parameter to define itself. This simplified mutation operator is effective over a wide range of the parameter value.

  2. 36 CFR 1225.12 - How are records schedules developed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activity to identify records series, systems, and nonrecord materials. (c) Determine the appropriate scope of the records schedule items, e.g., individual series/system component, work process, group of related work processes, or broad program area. (d) Evaluate the period of time the agency needs each...

  3. 36 CFR 1225.12 - How are records schedules developed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activity to identify records series, systems, and nonrecord materials. (c) Determine the appropriate scope of the records schedule items, e.g., individual series/system component, work process, group of related work processes, or broad program area. (d) Evaluate the period of time the agency needs each...

  4. 36 CFR 1225.12 - How are records schedules developed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activity to identify records series, systems, and nonrecord materials. (c) Determine the appropriate scope of the records schedule items, e.g., individual series/system component, work process, group of related work processes, or broad program area. (d) Evaluate the period of time the agency needs each...

  5. Scheduling language and algorithm development study. Appendix: Study approach and activity summary

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

  6. An Expert System for Aviation Squadron Flight Scheduling

    DTIC Science & Technology

    1991-09-01

    SCHEDULING A. OVERVIEW A flight schedule is an organization’s plan to accomplish specific missions with its available resources. It details the mission...schedule for every 24 hour period, and will occasionally write a weekly flight schedule for long range planning purposes. The flight schedule is approved...requirements, and 11 aircraft, trainer, and aircrew availability to formulate the flight schedule. It basically is a plan to optimize the squadron’s resources

  7. Scheduler software for tracking and data relay satellite system loading analysis: User manual and programmer guide

    NASA Technical Reports Server (NTRS)

    Craft, R.; Dunn, C.; Mccord, J.; Simeone, L.

    1980-01-01

    A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.

  8. Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission

    NASA Technical Reports Server (NTRS)

    Garcia, Gonzalo; Barnoy, Assaf; Beech, Theresa; Saylor, Rick; Cosgrove, Jennifer Sager; Ritter, Sheila

    2009-01-01

    In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.

  9. Interactive Dynamic Mission Scheduling for ASCA

    NASA Astrophysics Data System (ADS)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  10. Transit scheduling: Basic and advanced manuals. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pine, R.; Niemeyer, J.; Chisholm, R.

    1998-12-01

    This manual will be of interest to new transit schedulers, experienced schedulers, transit planners, operating staff, and others who need to be conversant with the scheduling process. The materials clearly describe all steps in the bus and light rail scheduling process, under TCRP Project A-11, Transit Scheduling: A Manual with Materials, research was undertaken by Transportation Management and Design of Solana Beach, California, to prepare a transit scheduling manual that incorporates modern training techniques for bus and light rail transit scheduling. The manual consists of two sections: a basic treatment and an advanced section. The basic-level section is in anmore » instructional format designed primarily for novice schedulers and other transit staff. The advance section covers more complex scheduling requirements. Each section may be used sequentially or independently and is designed to integrate with agency apprenticeship and on-the-job training.« less

  11. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  12. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  13. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  14. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  15. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  16. A new technology for manufacturing scheduling derived from space system operations

    NASA Technical Reports Server (NTRS)

    Hornstein, R. S.; Willoughby, J. K.

    1993-01-01

    A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

  17. Breadth and Intensity: Salient, Separable, and Developmentally Significant Dimensions of Structured Youth Activity Involvement

    ERIC Educational Resources Information Center

    Busseri, Michael A.; Rose-Krasnor, Linda

    2009-01-01

    In recent years, an impressive volume of evidence has accumulated demonstrating that youth involvement in structured, organized activities (e.g. school sports, community clubs) may facilitate positive youth development. We present a theory-based framework for studying structured activity involvement (SAI) as a context for positive youth…

  18. A novel discrete PSO algorithm for solving job shop scheduling problem to minimize makespan

    NASA Astrophysics Data System (ADS)

    Rameshkumar, K.; Rajendran, C.

    2018-02-01

    In this work, a discrete version of PSO algorithm is proposed to minimize the makespan of a job-shop. A novel schedule builder has been utilized to generate active schedules. The discrete PSO is tested using well known benchmark problems available in the literature. The solution produced by the proposed algorithms is compared with best known solution published in the literature and also compared with hybrid particle swarm algorithm and variable neighborhood search PSO algorithm. The solution construction methodology adopted in this study is found to be effective in producing good quality solutions for the various benchmark job-shop scheduling problems.

  19. 24 CFR 982.517 - Utility allowance schedule.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... percent or more in the utility rate since the last time the utility allowance schedule was revised. The... allowance schedule to correct any errors, or as necessary to update the schedule. (d) Use of utility...

  20. 24 CFR 982.517 - Utility allowance schedule.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... percent or more in the utility rate since the last time the utility allowance schedule was revised. The... allowance schedule to correct any errors, or as necessary to update the schedule. (d) Use of utility...