2009-07-30
management information systems for collecting data on their reconstruction activities, but there is no single management information system that provides...spreadsheets, presentations, and other ad hoc reports. An integrated management information system that provides a common operating picture of all U.S
32 CFR Appendix D to Part 169a - Commercial Activities Management Information System (CAMIS)
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Commercial Activities Management Information... to Part 169a—Commercial Activities Management Information System (CAMIS) Each DoD Component shall... American Standard Code Information Interchange text file format on a MicroSoft-Disk Operating System...
1982-05-14
Attachment 2 contains the reports and lessons learned which resulted from the Level II Weapon System Management activities. Attachment 3 contains the reports...and lessons learned which resulted from the Level III Weapon System Management activities. _____ r. Air Force Logistics Command Attn: Col. McConnell 2...May 14, 1982 Attachment 4 contains the plans and lessons learned which resulted from the RCC Evaluation activities. I am pleased to deliver these
30 CFR 285.811 - When must I follow my Safety Management System?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Activities Conducted Under SAPs, COPs and GAPs Safety Management Systems § 285.811 When must I follow my... activities described in your approved COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in accordance with the Safety Management System you described, as required by...
Ruland, C M; Ravn, I H
2001-01-01
An important strategy for improving resource management and cost containment in health care is to develop information systems that assist hospital managers in financial management, resource allocation, and activity planning. A crucial part of such development is a rigorous evaluation to assess whether the system accomplishes it's intended goals. To evaluate CLASSICA, a Decision Support System (DSS), that assists nurse managers in financial management, resource allocation, staffing, and activity planning. Using a pre-post test design with control units, CLASSICA was evaluated in four test units. Baseline data and simultaneous parallel measures were collected prior to system implementation at test sites and control units. Using expense reports, staffing and financial statistics, surveys, interviews with nurse managers, and logs as data sources, CLASSICA was evaluated on: cost reduction, quality of management information; usefulness as decision support for improved financial management and decision-making; user satisfaction; and ease of use. Evaluation results showed a 41% reduction in expenditures for overtime and extra hours as compared to a 1.8% reduction in control units during the same time period. Users reported a significant improvement in management information; nurse managers stated that they had gained control over costs. The system helped them analyze the relationships between patient activity staffing, and cost of care. Users reported high satisfaction with the system, the information and decision support it provided, and its ease of use. These results suggest that CLASSICA is a DSS that successfully assists nurse managers in cost effective management of their units.
Activity-Based Management Accounting for DoD Depot Maintenance
1994-08-01
used to establish a management accounting system for the depots is described. The current accounting system does not provide the information to answer...nondirect costs are tied solely to direct labor hours. A possible alternative management accounting system uses Activity-Based Costing (ABC). ABC links...along with its probable benefits and costs. Accounting, Management accounting , Cost analysis, Depot maintenance cost.
Smart self management: assistive technology to support people with chronic disease.
Zheng, Huiru; Nugent, Chris; McCullagh, Paul; Huang, Yan; Zhang, Shumei; Burns, William; Davies, Richard; Black, Norman; Wright, Peter; Mawson, Sue; Eccleston, Christopher; Hawley, Mark; Mountain, Gail
2010-01-01
We have developed a personalised self management system to support self management of chronic conditions with support from health-care professionals. Accelerometers are used to measure gross levels of activity, for example walking around the house, and used to infer higher level activity states, such as standing, sitting and lying. A smart phone containing an accelerometer and a global positioning system (GPS) module can be used to monitor outdoor activity, providing both activity and location based information. Heart rate, blood pressure and weight are recorded and input to the system by the user. A decision support system (DSS) detects abnormal activity and distinguishes life style patterns. The DSS is used to assess the self management process, and automates feedback to the user, consistent with the achievement of their life goals. We have found that telecare and assistive technology is feasible to support self management for chronic conditions within the home and local community environments.
United States Army Medical Materiel Development Activity: 1997 Annual Report.
1997-01-01
business planning and execution information management system (Project Management Division Database ( PMDD ) and Product Management Database System (PMDS...MANAGEMENT • Project Management Division Database ( PMDD ), Product Management Database System (PMDS), and Special Users Database System:The existing...System (FMS), were investigated. New Product Managers and Project Managers were added into PMDS and PMDD . A separate division, Support, was
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less
Operations-oriented performance measures for freeway management systems : final report.
DOT National Transportation Integrated Search
2008-12-01
This report describes the second and final year activities of the project titled Using Operations-Oriented Performance Measures to Support Freeway Management Systems. Work activities included developing a prototype system architecture for testi...
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng
2018-03-01
In this paper, the semi-active RFID watt-hour meter is applied to automatic test lines and intelligent warehouse management, from the transmission system, test system and auxiliary system, monitoring system, realize the scheduling of watt-hour meter, binding, control and data exchange, and other functions, make its more accurate positioning, high efficiency of management, update the data quickly, all the information at a glance. Effectively improve the quality, efficiency and automation of verification, and realize more efficient data management and warehouse management.
Forming system of strategic innovation management at high-tech engineering enterprises
NASA Astrophysics Data System (ADS)
Ergunova, O. T.; Lizunkov, V. G.; Malushko, E. Yu; Marchuk, V. I.; Ignatenko, A. Yu
2017-02-01
The article considers the processes of forming the strategic system of innovative activity management at the enterprises of a high-tech mechanical engineering complex (MEC) that are traditionally decisive in shaping the economic base of Russia. The authors proposed a method of designing a strategic system of innovative activity management at the MEC’s enterprises of the region which is based on the consideration of means and opportunities of the enterprise to implement intellectual activity. The proposed methodology and the empirical results constituted a ground for developing a system of strategic innovation management when performing the state-guaranteed order at the hi-tech MEC enterprises. Its implementation will help to reduce the level of uncertainty throughout the entire life cycle of an innovative activity product.
Weight Optimization of Active Thermal Management Using a Novel Heat Pump
NASA Technical Reports Server (NTRS)
Lear, William E.; Sherif, S. A.
2004-01-01
Efficient lightweight power generation and thermal management are two important aspects for space applications. Weight is added to the space platforms due to the inherent weight of the onboard power generation equipment and the additional weight of the required thermal management systems. Thermal management of spacecraft relies on rejection of heat via radiation, a process that can result in large radiator mass, depending upon the heat rejection temperature. For some missions, it is advantageous to incorporate an active thermal management system, allowing the heat rejection temperature to be greater than the load temperature. This allows a reduction of radiator mass at the expense of additional system complexity. A particular type of active thermal management system is based on a thermodynamic cycle, developed by the authors, called the Solar Integrated Thermal Management and Power (SITMAP) cycle. This system has been a focus of the authors research program in the recent past (see Fig. 1). One implementation of the system requires no moving parts, which decreases the vibration level and enhances reliability. Compression of the refrigerant working fluid is accomplished in this scheme via an ejector.
Model Meets Data: Challenges and Opportunities to Implement Land Management in Earth System Models
NASA Astrophysics Data System (ADS)
Pongratz, J.; Dolman, A. J.; Don, A.; Erb, K. H.; Fuchs, R.; Herold, M.; Jones, C.; Luyssaert, S.; Kuemmerle, T.; Meyfroidt, P.
2016-12-01
Land-based demand for food and fibre is projected to increase in the future. In light of global sustainability challenges only part of this increase will be met by expansion of land use into relatively untouched regions. Additional demand will have to be fulfilled by intensification and other adjustments in management of land that already is under agricultural and forestry use. Such land management today occurs on about half of the ice-free land surface, as compared to only about one quarter that has undergone a change in land cover. As the number of studies revealing substantial biogeophysical and biogeochemical effects of land management is increasing, moving beyond land cover change towards including land management has become a key focus for Earth system modeling. However, a basis for prioritizing land management activities for implementation in models is lacking. We lay this basis for prioritization in a collaborative project across the disciplines of Earth system modeling, land system science, and Earth observation. We first assess the status and plans of implementing land management in Earth system and dynamic global vegetation models. A clear trend towards higher complexity of land use representation is visible. We then assess five criteria for prioritizing the implementation of land management activities: (1) spatial extent, (2) evidence for substantial effects on the Earth system, (3) process understanding, (4) possibility to link the management activity to existing concepts and structures of models, (5) availability of data required as model input. While the first three criteria have been assessed by an earlier study for ten common management activities, we review strategies for implementation in models and the availability of required datasets. We can thus evaluate the management activities for their performance in terms of importance for the Earth system, possibility of technical implementation in models, and data availability. This synthesis reveals some "low-hanging" fruits for model implementation, but also challenges for the assessment of land management effects by modeling. The identified gaps can guide prioritization within the data community from the Earth system and Earth system modeling perspective.
Model meets data: Challenges and opportunities to implement land management in Earth System Models
NASA Astrophysics Data System (ADS)
Pongratz, Julia; Dolman, Han; Don, Axel; Erb, Karl-Heinz; Fuchs, Richard; Herold, Martin; Jones, Chris; Luyssaert, Sebastiaan; Kuemmerle, Tobias; Meyfroidt, Patrick; Naudts, Kim
2017-04-01
Land-based demand for food and fibre is projected to increase in the future. In light of global sustainability challenges only part of this increase will be met by expansion of land use into relatively untouched regions. Additional demand will have to be fulfilled by intensification and other adjustments in management of land that already is under agricultural and forestry use. Such land management today occurs on about half of the ice-free land surface, as compared to only about one quarter that has undergone a change in land cover. As the number of studies revealing substantial biogeophysical and biogeochemical effects of land management is increasing, moving beyond land cover change towards including land management has become a key focus for Earth system modeling. However, a basis for prioritizing land management activities for implementation in models is lacking. We lay this basis for prioritization in a collaborative project across the disciplines of Earth system modeling, land system science, and Earth observation. We first assess the status and plans of implementing land management in Earth system and dynamic global vegetation models. A clear trend towards higher complexity of land use representation is visible. We then assess five criteria for prioritizing the implementation of land management activities: (1) spatial extent, (2) evidence for substantial effects on the Earth system, (3) process understanding, (4) possibility to link the management activity to existing concepts and structures of models, (5) availability of data required as model input. While the first three criteria have been assessed by an earlier study for ten common management activities, we review strategies for implementation in models and the availability of required datasets. We can thus evaluate the management activities for their performance in terms of importance for the Earth system, possibility of technical implementation in models, and data availability. This synthesis reveals some "low-hanging" fruits for model implementation, but also challenges for the assessment of land management effects by modeling. The identified gaps can guide prioritization within the data community from the Earth system and Earth system modeling perspective.
41 CFR 101-30.701-3 - Preparing activity.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-30.701-3 Section 101-30.701-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... agency responsible for the preparation of item reduction studies, or an activity authorized by the listed...
41 CFR 101-30.701-3 - Preparing activity.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-30.701-3 Section 101-30.701-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... agency responsible for the preparation of item reduction studies, or an activity authorized by the listed...
41 CFR 101-30.701-3 - Preparing activity.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-30.701-3 Section 101-30.701-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... agency responsible for the preparation of item reduction studies, or an activity authorized by the listed...
41 CFR 101-30.701-3 - Preparing activity.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-30.701-3 Section 101-30.701-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... agency responsible for the preparation of item reduction studies, or an activity authorized by the listed...
41 CFR 101-30.701-3 - Preparing activity.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-30.701-3 Section 101-30.701-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... agency responsible for the preparation of item reduction studies, or an activity authorized by the listed...
Contracts and management services site support program plan WBS 6.10.14
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1994-09-01
Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Programmore » Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.« less
Exercise Performance Measurement with Smartphone Embedded Sensor for Well-Being Management
Liu, Chung-Tse; Chan, Chia-Tai
2016-01-01
Regular physical activity reduces the risk of many diseases and improves physical and mental health. However, physical inactivity is widespread globally. Improving physical activity levels is a global concern in well-being management. Exercise performance measurement systems have the potential to improve physical activity by providing feedback and motivation to users. We propose an exercise performance measurement system for well-being management that is based on the accumulated activity effective index (AAEI) and incorporates a smartphone-embedded sensor. The proposed system generates a numeric index that is based on users’ exercise performance: their level of physical activity and number of days spent exercising. The AAEI presents a clear number that can serve as a useful feedback and goal-setting tool. We implemented the exercise performance measurement system by using a smartphone and conducted experiments to assess the feasibility of the system and investigated the user experience. We recruited 17 participants for validating the feasibility of the measurement system and a total of 35 participants for investigating the user experience. The exercise performance measurement system showed an overall precision of 88% in activity level estimation. Users provided positive feedback about their experience with the exercise performance measurement system. The proposed system is feasible and has a positive effective on well-being management. PMID:27727188
Exercise Performance Measurement with Smartphone Embedded Sensor for Well-Being Management.
Liu, Chung-Tse; Chan, Chia-Tai
2016-10-11
Regular physical activity reduces the risk of many diseases and improves physical and mental health. However, physical inactivity is widespread globally. Improving physical activity levels is a global concern in well-being management. Exercise performance measurement systems have the potential to improve physical activity by providing feedback and motivation to users. We propose an exercise performance measurement system for well-being management that is based on the accumulated activity effective index (AAEI) and incorporates a smartphone-embedded sensor. The proposed system generates a numeric index that is based on users' exercise performance: their level of physical activity and number of days spent exercising. The AAEI presents a clear number that can serve as a useful feedback and goal-setting tool. We implemented the exercise performance measurement system by using a smartphone and conducted experiments to assess the feasibility of the system and investigated the user experience. We recruited 17 participants for validating the feasibility of the measurement system and a total of 35 participants for investigating the user experience. The exercise performance measurement system showed an overall precision of 88% in activity level estimation. Users provided positive feedback about their experience with the exercise performance measurement system. The proposed system is feasible and has a positive effective on well-being management.
Systemize Classroom Management to Enhance Teaching and Learning
ERIC Educational Resources Information Center
Delman, Douglas J.
2011-01-01
Good classroom management is one of the most important goals teachers strive to establish from the first day of class. The rules, procedures, activities, and behaviors set the classroom tone throughout the school year. By revising, updating, and systemizing classroom management activities, teachers can eliminate many problems created by students…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-19
...] Agency Information Collection Activities; Announcement of Office of Management and Budget Approval... ``Unique Device Identification System'' has been approved by the Office of Management and Budget (OMB... information entitled ``Unique Device Identification System'' to OMB for review and clearance under 44 U.S.C...
Code of Federal Regulations, 2011 CFR
2011-10-01
... support or improve: organizational policy development; decision-making; management and administration... organizations, activities (including management and support services for R&D activities), or systems. These..., decision-making, management, or administration. Included are studies in support of R&D activities. Also...
Code of Federal Regulations, 2010 CFR
2010-10-01
... support or improve: organizational policy development; decision-making; management and administration... organizations, activities (including management and support services for R&D activities), or systems. These..., decision-making, management, or administration. Included are studies in support of R&D activities. Also...
Mars transit vehicle thermal protection system: Issues, options, and trades
NASA Technical Reports Server (NTRS)
Brown, Norman
1986-01-01
A Mars mission is characterized by different mission phases. The thermal control of cryogenic propellant in a propulsive vehicle must withstand the different mission environments. Long term cryogenic storage may be achieved by passive or active systems. Passive cryo boiloff management features will include multilayer insulation, vapor cooled shield, and low conductance structural supports and penetrations. Active boiloff management incorporates the use of a refrigeration system. Key system trade areas include active verses passive system boiloff management (with respect to safety, reliability, and cost) and propellant tank insulation optimizations. Technology requirements include refrigeration technology advancements, insulation performance during long exposure, and cryogenic fluid transfer system for mission vehicle propellant tanking during vehicle buildip in LEO.
A Case Study of the United States Navy’s Enterprise Resource Planning System
2006-06-01
incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system
MATS--Management Accounting Tutorial System. Version 1.0. User Guide.
ERIC Educational Resources Information Center
Wardle, Andrew; O'Connor, Rodric
The Management Accounting Tutorial System (MATS) is a management accounting database for a carpet manufacturing company. The system allows the display and output of monthly activities, and is intended to provide a means of illustrating the main topics of the second year management accounting course at Manchester University. The system itself…
Course Management Systems: Time for Users to Get What They Need
ERIC Educational Resources Information Center
Ioannou, Andri; Hannafin, Robert D.
2008-01-01
Course management systems (CMSs) are software systems designed to manage course content and course activities. These tools integrate technological and pedagogical features into a web-based system that allows instructors, even those who are unfamiliar with web-based technologies, to design, deliver, and manage an online course. However, CMSs have…
MATS--Management Accounting Tutorial System. Version 1.0. Project Documentation.
ERIC Educational Resources Information Center
Wardle, Andrew; O'Connor, Rodric
The Management Accounting Tutorial System (MATS) is a management accounting database for a carpet manufacturing company. The system allows the display and output of monthly activities, and is intended to provide a means of illustrating the main topics of the second year management accounting course at Manchester University. The system itself…
Towards integrated hygiene and food safety management systems: the Hygieneomic approach.
Armstrong, G D
1999-09-15
Integrated hygiene and food safety management systems in food production can give rise to exceptional improvements in food safety performance, but require high level commitment and full functional involvement. A new approach, named hygieneomics, has been developed to assist management in their introduction of hygiene and food safety systems. For an effective introduction, the management systems must be designed to fit with the current generational state of an organisation. There are, broadly speaking, four generational states of an organisation in their approach to food safety. They comprise: (i) rules setting; (ii) ensuring compliance; (iii) individual commitment; (iv) interdependent action. In order to set up an effective integrated hygiene and food safety management system a number of key managerial requirements are necessary. The most important ones are: (a) management systems must integrate the activities of key functions from research and development through to supply chain and all functions need to be involved; (b) there is a critical role for the senior executive, in communicating policy and standards; (c) responsibilities must be clearly defined, and it should be clear that food safety is a line management responsibility not to be delegated to technical or quality personnel; (d) a thorough and effective multi-level audit approach is necessary; (e) key activities in the system are HACCP and risk management, but it is stressed that these are ongoing management activities, not once-off paper generating exercises; and (f) executive management board level review is necessary of audit results, measurements, status and business benefits.
17 CFR 240.3b-15 - Definition of ancillary portfolio management securities activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... governing body of the dealer and included in the internal risk management control system for the dealer... of incidental trading activities for portfolio management purposes; and (3) Are limited to risk... portfolio management securities activities. 240.3b-15 Section 240.3b-15 Commodity and Securities Exchanges...
Hospital's activity-based financing system and manager-physician [corrected] interaction.
Crainich, David; Leleu, Hervé; Mauleon, Ana
2011-10-01
This paper examines the consequences of the introduction of an activity-based reimbursement system on the behavior of physicians and hospital's managers. We consider a private for-profit sector where both hospitals and physicians are initially paid on a fee-for-service basis. We show that the benefit of the introduction of an activity-based system depends on the type of interaction between managers and physicians (simultaneous or sequential decision-making games). It is shown that, under the activity-based system, a sequential interaction with physician leader could be beneficial for both agents in the private sector. We further model an endogenous timing game à la Hamilton and Slutsky (Games Econ Behav 2: 29-46, 1990) in which the type of interaction is determined endogenously. We show that, under the activity-based system, the sequential interaction with physician leader is the unique subgame perfect equilibrium.
ERIC Educational Resources Information Center
Anderson, Scott; Raasch, Kevin
2002-01-01
Provides an evaluation template for student activities professionals charged with evaluating competitive event scheduling software. Guides staff in making an informed decision on whether to retain event management technology provided through an existing vendor or choose "best-of-breed" scheduling software. (EV)
ERIC Educational Resources Information Center
Jaradat, Suhair; Qablan, Ahmad; Barham, Areej
2011-01-01
This paper explains how the activity theory is used as a framework to analyze the barriers to a virtual Management Information Stream (MIS) Curriculum in Jordanian schools, from both the sociocultural and pedagogical perspectives. Taking the activity system as a unit of analysis, this study documents the processes by which activities shape and are…
A safety management system for an offshore Azerbaijan Caspian Sea Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brasic, M.F.; Barber, S.W.; Hill, A.S.
1996-11-01
This presentation will describe the Safety Management System that Azerbaijan International Operating Company (AIOC) has structured to assure that Company activities are performed in a manner that protects the public, the environment, contractors and AIOC employees. The Azerbaijan International Oil Company is a consortium of oil companies that includes Socar, the state oil company of Azerbaijan, a number of major westem oil companies, and companies from Russia, Turkey and Saudi Arabia. The Consortium was formed to develop and produce a group of large oil fields in the Caspian Sea. The Management of AIOC, in starting a new operation in Azerbaijan,more » recognized the need for a formal HSE management system to ensure that their HSE objectives for AIOC activities were met. As a consortium of different partners working together in a unique operation, no individual partner company HSE Management system was appropriate. Accordingly AIOC has utilized the E & P Forum {open_quotes}Guidelines for the Development and Application of Health Safety and Environmental Management Systems{close_quotes} as the framework document for the development of the new AIOC system. Consistent with this guideline, AIOC has developed 19 specific HSE Management System Expectations for implementing its HSE policy and objectives. The objective is to establish and continue to maintain operational integrity in all AIOC activities and site operations. An important feature is the use of structured Safety Cases for the design engineering activity. The basis for the Safety Cases is API RP 75 and 14 J for offshore facilities and API RP 750 for onshore facilities both complimented by {open_quotes}Best International Oilfield Practice{close_quotes}. When viewed overall, this approach provides a fully integrated system of HSE management from design into operation.« less
Land management: data availability and process understanding for global change studies.
Erb, Karl-Heinz; Luyssaert, Sebastiaan; Meyfroidt, Patrick; Pongratz, Julia; Don, Axel; Kloster, Silvia; Kuemmerle, Tobias; Fetzel, Tamara; Fuchs, Richard; Herold, Martin; Haberl, Helmut; Jones, Chris D; Marín-Spiotta, Erika; McCallum, Ian; Robertson, Eddy; Seufert, Verena; Fritz, Steffen; Valade, Aude; Wiltshire, Andrew; Dolman, Albertus J
2017-02-01
In the light of daunting global sustainability challenges such as climate change, biodiversity loss and food security, improving our understanding of the complex dynamics of the Earth system is crucial. However, large knowledge gaps related to the effects of land management persist, in particular those human-induced changes in terrestrial ecosystems that do not result in land-cover conversions. Here, we review the current state of knowledge of ten common land management activities for their biogeochemical and biophysical impacts, the level of process understanding and data availability. Our review shows that ca. one-tenth of the ice-free land surface is under intense human management, half under medium and one-fifth under extensive management. Based on our review, we cluster these ten management activities into three groups: (i) management activities for which data sets are available, and for which a good knowledge base exists (cropland harvest and irrigation); (ii) management activities for which sufficient knowledge on biogeochemical and biophysical effects exists but robust global data sets are lacking (forest harvest, tree species selection, grazing and mowing harvest, N fertilization); and (iii) land management practices with severe data gaps concomitant with an unsatisfactory level of process understanding (crop species selection, artificial wetland drainage, tillage and fire management and crop residue management, an element of crop harvest). Although we identify multiple impediments to progress, we conclude that the current status of process understanding and data availability is sufficient to advance with incorporating management in, for example, Earth system or dynamic vegetation models in order to provide a systematic assessment of their role in the Earth system. This review contributes to a strategic prioritization of research efforts across multiple disciplines, including land system research, ecological research and Earth system modelling. © 2016 John Wiley & Sons Ltd.
Developing an Active Traffic Management System for I-70 in Colorado
DOT National Transportation Integrated Search
2012-09-01
The Colorado DOT is at the forefront of developing an Active Traffic Management (ATM) system that not only : considers operation aspects, but also integrates safety measures. In this research, data collected from Automatic : Vehicle Identification (A...
ERIC Educational Resources Information Center
Valle, Victor M.
Often personnel performing managerial functions within educational systems are educators with almost no training in management. This paper presents ideas on how to organize a training activity intended to develop management knowledge and skills among educational systems officials and to implement an organizational self-study on management…
Strategic Methodologies in Public Health Cost Analyses.
Whittington, Melanie; Atherly, Adam; VanRaemdonck, Lisa; Lampe, Sarah
The National Research Agenda for Public Health Services and Systems Research states the need for research to determine the cost of delivering public health services in order to assist the public health system in communicating financial needs to decision makers, partners, and health reform leaders. The objective of this analysis is to compare 2 cost estimation methodologies, public health manager estimates of employee time spent and activity logs completed by public health workers, to understand to what degree manager surveys could be used in lieu of more time-consuming and burdensome activity logs. Employees recorded their time spent on communicable disease surveillance for a 2-week period using an activity log. Managers then estimated time spent by each employee on a manager survey. Robust and ordinary least squares regression was used to measure the agreement between the time estimated by the manager and the time recorded by the employee. The 2 outcomes for this study included time recorded by the employee on the activity log and time estimated by the manager on the manager survey. This study was conducted in local health departments in Colorado. Forty-one Colorado local health departments (82%) agreed to participate. Seven of the 8 models showed that managers underestimate their employees' time, especially for activities on which an employee spent little time. Manager surveys can best estimate time for time-intensive activities, such as total time spent on a core service or broad public health activity, and yet are less precise when estimating discrete activities. When Public Health Services and Systems Research researchers and health departments are conducting studies to determine the cost of public health services, there are many situations in which managers can closely approximate the time required and produce a relatively precise approximation of cost without as much time investment by practitioners.
Automated Rocket Propulsion Test Management
NASA Technical Reports Server (NTRS)
Walters, Ian; Nelson, Cheryl; Jones, Helene
2007-01-01
The Rocket Propulsion Test-Automated Management System provides a central location for managing activities associated with Rocket Propulsion Test Management Board, National Rocket Propulsion Test Alliance, and the Senior Steering Group business management activities. A set of authorized users, both on-site and off-site with regard to Stennis Space Center (SSC), can access the system through a Web interface. Web-based forms are used for user input with generation and electronic distribution of reports easily accessible. Major functions managed by this software include meeting agenda management, meeting minutes, action requests, action items, directives, and recommendations. Additional functions include electronic review, approval, and signatures. A repository/library of documents is available for users, and all items are tracked in the system by unique identification numbers and status (open, closed, percent complete, etc.). The system also provides queries and version control for input of all items.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
... for OMB Review; Comment Request; Workforce Investment Act Management Information and Reporting System... Management Information and Reporting System,'' to the Office of Management and Budget (OMB) for review and... Management Information and Reporting System with modifications to make Workforce Investment Act (WIA...
A new costing model in hospital management: time-driven activity-based costing system.
Öker, Figen; Özyapıcı, Hasan
2013-01-01
Traditional cost systems cause cost distortions because they cannot meet the requirements of today's businesses. Therefore, a new and more effective cost system is needed. Consequently, time-driven activity-based costing system has emerged. The unit cost of supplying capacity and the time needed to perform an activity are the only 2 factors considered by the system. Furthermore, this system determines unused capacity by considering practical capacity. The purpose of this article is to emphasize the efficiency of the time-driven activity-based costing system and to display how it can be applied in a health care institution. A case study was conducted in a private hospital in Cyprus. Interviews and direct observations were used to collect the data. The case study revealed that the cost of unused capacity is allocated to both open and laparoscopic (closed) surgeries. Thus, by using the time-driven activity-based costing system, managers should eliminate the cost of unused capacity so as to obtain better results. Based on the results of the study, hospital management is better able to understand the costs of different surgeries. In addition, managers can easily notice the cost of unused capacity and decide how many employees to be dismissed or directed to other productive areas.
Lindenbraten, A L; Dubinin, N D; Ludupova, E Yu; Kriutchkov, D V; Nikolaev, N S; Dubograii, E V
2016-01-01
The sociological study was carried out concerning effectiveness of systems of quality management. The technique of questionnaire survey was implemented in medical organizations with functioning systems of quality management and internationally certified systems. The evaluation by medical personnel impact of system of quality management on their activities based on results of using the given management sub-system was selected as a study object. At that, opinion ofpersonnel concerning time dynamics of indices of activity was served as a study subject. The involvement of personnel, alterations in activities of organization, remuneration of labor, effectiveness of treatment from point of view of organizations' staff members were considered. The conclusion was made that personnel of considered organizations has favorable opinion concerning effectiveness of the given systems. Among particular characteristics ofmedical care, 67% of respondents marked improvement of organization of functioning and 36% out of them marked significant improvement. The most of respondents (69%) felt positive dynamics of activities. At that, personnel of organizations mark no increasing of income in 68% of all cases and only 24% of respondents indicated salary increasing. Among negative outcomes of implementation of system of quality management, the respondents focused on increasing of workload. This trend was marked by 53% of personnel and 30% out of them indicated significant increasing of workload. The absence of alterations was marked by 38% of respondents and decreasing of workload was confirmed only by 9% of respondents.
TEX-SIS FOLLOW-UP: Student Follow-up Management Information System. Activities Manual.
ERIC Educational Resources Information Center
Tarrant County Junior Coll. District, Ft. Worth, TX.
Project FOLLOW-UP was conducted to develop, test, and validate a statewide management information system for follow-up of Texas public junior and community college students. This activities manual provides an overview of the resultant student information system (TEX-SIS) and its characteristics. Seven subsystems comprise SIS, each with its own…
Clinical utility of sympathetic blockade in cardiovascular disease management.
Park, Chan Soon; Lee, Hae-Young
2017-04-01
A dysregulated sympathetic nervous system is a major factor in the development and progression of cardiovascular disease; thus, understanding the mechanism and function of the sympathetic nervous system and appropriately regulating sympathetic activity to treat various cardiovascular diseases are crucial. Areas covered: This review focused on previous studies in managing hypertension, atrial fibrillation, coronary artery disease, heart failure, and perioperative management with sympathetic blockade. We reviewed both pharmacological and non-pharmacological management. Expert commentary: Chronic sympathetic nervous system activation is related to several cardiovascular diseases mediated by various pathways. Advancement in measuring sympathetic activity makes visualizing noninvasively and evaluating the activation level even in single fibers possible. Evidence suggests that sympathetic blockade still has a role in managing hypertension and controlling the heart rate in atrial fibrillation. For ischemic heart disease, beta-adrenergic receptor antagonists have been considered a milestone drug to control symptoms and prevent long-term adverse effects, although its clinical implication has become less potent in the era of successful revascularization. Owing to pathologic involvement of sympathetic nervous system activation in heart failure progression, sympathetic blockade has proved its value in improving the clinical course of patients with heart failure.
Recommended satellite imagery capabilities for disaster management
NASA Technical Reports Server (NTRS)
Richards, P. B.; Robinove, C. J.; Wiesnet, D. R.; Salomonson, V. V.; Maxwell, M. S.
1982-01-01
This study explores the role that satellite imaging systems might play in obtaining information needed in the management of natural and manmade disasters. Information requirements which might conceivably be met by satellite were identified for over twenty disasters. These requirements covered pre-disaster mitigation and preparedness activities, disaster response activities, and post-disaster recovery activities. The essential imaging satellite characteristics needed to meet most of the information requirements are 30 meter (or finer) spatial resolution, frequency of observations of one week or less, data delivery times of one day or less, and stereo, synoptic all-weather coverage of large areas in the visible, near infrared, thermal infrared and microwave bands. Of the current and planned satellite systems investigated for possible application to disaster management, Landsat-D and SPOT appear to have the greatest potential during disaster mitigation and preparedness activities, but all satellites studied have serious deficiencies during response and recovery activities. Several strawman concepts are presented for a satellite system optimized to support all disaster management activities.
30 CFR 585.811 - When must I follow my Safety Management System?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., COPs and GAPs Safety Management Systems § 585.811 When must I follow my Safety Management System? Your... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...
30 CFR 585.811 - When must I follow my Safety Management System?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., COPs and GAPs Safety Management Systems § 585.811 When must I follow my Safety Management System? Your... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...
30 CFR 585.811 - When must I follow my Safety Management System?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., COPs and GAPs Safety Management Systems § 585.811 When must I follow my Safety Management System? Your... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...
41 CFR 101-28.203-1 - Government storage activity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Government storage... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 28-STORAGE AND DISTRIBUTION 28.2-Interagency Cross-Servicing in Storage Activities § 101-28.203-1 Government storage activity...
Quality improvement in basic histotechnology: the lean approach.
Clark, David
2016-01-01
Lean is a comprehensive system of management based on the Toyota production system (TPS), encompassing all the activities of an organization. It focuses management activity on creating value for the end-user by continuously improving operational effectiveness and removing waste. Lean management creates a culture of continuous quality improvement with a strong emphasis on developing the problem-solving capability of staff using the scientific method (Deming's Plan, Do, Check, Act cycle). Lean management systems have been adopted by a number of histopathology departments throughout the world to simultaneously improve quality (reducing errors and shortening turnround times) and lower costs (by increasing efficiency). This article describes the key concepts that make up a lean management system, and how these concepts have been adapted from manufacturing industry and applied to histopathology using a case study of lean implementation and evidence from the literature. It discusses the benefits, limitations, and pitfalls encountered when implementing lean management systems.
NASA Astrophysics Data System (ADS)
Huang, T.; Alarcon, C.; Quach, N. T.
2014-12-01
Capture, curate, and analysis are the typical activities performed at any given Earth Science data center. Modern data management systems must be adaptable to heterogeneous science data formats, scalable to meet the mission's quality of service requirements, and able to manage the life-cycle of any given science data product. Designing a scalable data management doesn't happen overnight. It takes countless hours of refining, refactoring, retesting, and re-architecting. The Horizon data management and workflow framework, developed at the Jet Propulsion Laboratory, is a portable, scalable, and reusable framework for developing high-performance data management and product generation workflow systems to automate data capturing, data curation, and data analysis activities. The NASA's Physical Oceanography Distributed Active Archive Center (PO.DAAC)'s Data Management and Archive System (DMAS) is its core data infrastructure that handles capturing and distribution of hundreds of thousands of satellite observations each day around the clock. DMAS is an application of the Horizon framework. The NASA Global Imagery Browse Services (GIBS) is NASA's Earth Observing System Data and Information System (EOSDIS)'s solution for making high-resolution global imageries available to the science communities. The Imagery Exchange (TIE), an application of the Horizon framework, is a core subsystem for GIBS responsible for data capturing and imagery generation automation to support the EOSDIS' 12 distributed active archive centers and 17 Science Investigator-led Processing Systems (SIPS). This presentation discusses our ongoing effort in refining, refactoring, retesting, and re-architecting the Horizon framework to enable data-intensive science and its applications.
Software And Systems Engineering Risk Management
2010-04-01
RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
An integrated decision support system for TRAC: A proposal
NASA Technical Reports Server (NTRS)
Mukkamala, Ravi
1991-01-01
Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.
41 CFR 109-26.203 - Activity address codes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Activity address codes. 109-26.203 Section 109-26.203 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26...
Establishment of Textbook Information Management System Based on Active Server Page
ERIC Educational Resources Information Center
Geng, Lihua
2011-01-01
In the process of textbook management of universities, the flow of storage, collection and check of textbook is quite complicated and daily management flow and system also seriously constrains the efficiency of the management process. Thus, in order to combine the information management model and the traditional management model, it is necessary…
ITS data management system : year one activities
DOT National Transportation Integrated Search
1997-08-01
This report documents research conducted in the development of an ITS data management system, hereafter referred to as ITS DataLink. The objective of the ITS DataLink system is to retain, manage, share, and analyze ITS data for a variety of tra...
41 CFR 101-30.101-6 - Cataloging activity.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-30.101-6 Section 101-30.101-6 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... supply in the Federal Catalog System. [41 FR 11308, Mar. 18, 1976] ...
41 CFR 101-30.101-6 - Cataloging activity.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-30.101-6 Section 101-30.101-6 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... supply in the Federal Catalog System. [41 FR 11308, Mar. 18, 1976] ...
41 CFR 101-30.101-6 - Cataloging activity.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-30.101-6 Section 101-30.101-6 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... supply in the Federal Catalog System. [41 FR 11308, Mar. 18, 1976] ...
41 CFR 101-30.101-6 - Cataloging activity.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-30.101-6 Section 101-30.101-6 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... supply in the Federal Catalog System. [41 FR 11308, Mar. 18, 1976] ...
41 CFR 101-30.101-6 - Cataloging activity.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-30.101-6 Section 101-30.101-6 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... supply in the Federal Catalog System. [41 FR 11308, Mar. 18, 1976] ...
Development of risk models for Florida's bridge management system.
DOT National Transportation Integrated Search
2013-06-01
Florida Department of Transportation (FDOT) has been actively implementing the American Association of State Highway Transportation Officials (AASHTO) Pontis Bridge Management System (BMS), recently renamed AASHTOWare Bridge Management (BrM), to supp...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... screen activity in the National Emergency Management Information System for both call-related customer... desktop screen as they perform work in National Emergency Management Information System (NEMIS); (3) Avaya...), Enterprise Performance Information Management Section, Federal Emergency Management Agency, Texas National...
Development of the KOSMS management simulation training system and its application
NASA Astrophysics Data System (ADS)
Takatsu, Yoshiki
The use of games which simulate actual corporate management has recently become more common and is now utilized in various ways for in-house corporate training courses. KOSMS (Kobe Steel Management Simulation System), a training system designed to help improve the management skills of senior management staff, is a unique management simulation training system in which the participants, using personal computers, must make decisions concerning a variety of management activities, in simulated competition with other corporations. This report outlines the KOSMS system, and describes the basic structure and detailed contents of the management simulation models, and actual application of the KOSMS management simulation training.
Managing Analysis Models in the Design Process
NASA Technical Reports Server (NTRS)
Briggs, Clark
2006-01-01
Design of large, complex space systems depends on significant model-based support for exploration of the design space. Integrated models predict system performance in mission-relevant terms given design descriptions and multiple physics-based numerical models. Both the design activities and the modeling activities warrant explicit process definitions and active process management to protect the project from excessive risk. Software and systems engineering processes have been formalized and similar formal process activities are under development for design engineering and integrated modeling. JPL is establishing a modeling process to define development and application of such system-level models.
41 CFR 102-2.10 - What is the FMR's purpose?
Code of Federal Regulations, 2012 CFR
2012-01-01
... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 2-FEDERAL MANAGEMENT REGULATION SYSTEM Regulation System General § 102-2.10 What is the FMR's purpose? The FMR prescribes policies concerning property management and related administrative activities. GSA issues the FMR to carry out the...
41 CFR 102-2.10 - What is the FMR's purpose?
Code of Federal Regulations, 2011 CFR
2011-01-01
... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 2-FEDERAL MANAGEMENT REGULATION SYSTEM Regulation System General § 102-2.10 What is the FMR's purpose? The FMR prescribes policies concerning property management and related administrative activities. GSA issues the FMR to carry out the...
41 CFR 102-2.10 - What is the FMR's purpose?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 2-FEDERAL MANAGEMENT REGULATION SYSTEM Regulation System General § 102-2.10 What is the FMR's purpose? The FMR prescribes policies concerning property management and related administrative activities. GSA issues the FMR to carry out the...
41 CFR 102-2.10 - What is the FMR's purpose?
Code of Federal Regulations, 2014 CFR
2014-01-01
... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 2-FEDERAL MANAGEMENT REGULATION SYSTEM Regulation System General § 102-2.10 What is the FMR's purpose? The FMR prescribes policies concerning property management and related administrative activities. GSA issues the FMR to carry out the...
NPS pollution related to forest management activities in southern states
Johnny M. Grace
2004-01-01
Road systems on the nationâs public lands are vital links; providing access to perform management prescriptions, fire management, and recreation opportunities. Sediment movement downslope of forest road systems is a concern because these sediments have the potential to reach stream systems. Filter strips and stream side management zones (SMZs) are recommended and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
... Partnership Grants Management System (GMS) ACTION: 60-Day Notice of Information Collection under Review. The... Partnership Grants Management System (GMS). (3) The Agency Form Number, if any, and the Applicable Component... grants. GMS is the OJP web-based grants applications system and award management system. GMS provides...
An Educational System for the Seventies.
ERIC Educational Resources Information Center
Shelly (E.F.) and Co., New York, NY.
An Educational System for the Seventies (ES '70) is a research and demonstration program representing a broad scope of activity that cuts across every aspect of education. Four main categories of activities comprise the substance of the current effort: staff development, instructional managment and career guidance, school management, and…
DOT National Transportation Integrated Search
2016-02-15
This research study focused on the development and subsequent evaluation of an in-vehicle Active Traffic and Demand Management (ATDM) system deployed on Interstate 66 in Northern Virginia. The ATDM elements inside the vehicle allowed drivers to remai...
Moodog: Tracking Student Activity in Online Course Management Systems
ERIC Educational Resources Information Center
Zhang, Hangjin; Almeroth, Kevin
2010-01-01
Many universities are currently using Course Management Systems (CMSes) to conduct online learning, for example, by distributing course materials or submitting homework assignments. However, most CMSes do not include comprehensive activity tracking and analysis capabilities. This paper describes a method to track students' online learning…
Bringing Technology to the Resource Manager ... and Not the Reverse
Daniel L. Schmoldt
1992-01-01
Many natural resource managers envision their jobs as pressed between the resources that they have a mandate to manage and the technological aides that are essential tools to conduct those management activities. On the one hand, managers are straining to understand an extremely complex array of natural systems and the management pressures placed on those systems. Then...
Evaluation of the impact of the I-66 active traffic management system : final report.
DOT National Transportation Integrated Search
2016-09-01
Construction of a Virginia Department of Transportation project to install an Active Traffic Management (ATM) system on Interstate-66 (I-66) from U.S. 29 in Centreville to the Capital Beltway (I-495) was completed in September 2015. The project was c...
Designing for Inquiry-Based Learning with the Learning Activity Management System
ERIC Educational Resources Information Center
Levy, P.; Aiyegbayo, O.; Little, S.
2009-01-01
This paper explores the relationship between practitioners' pedagogical purposes, values and practices in designing for inquiry-based learning in higher education, and the affordances of the Learning Activity Management System (LAMS) as a tool for creating learning designs in this context. Using a qualitative research methodology, variation was…
Code of Federal Regulations, 2013 CFR
2013-10-01
... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...
Code of Federal Regulations, 2012 CFR
2012-10-01
... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...
Code of Federal Regulations, 2014 CFR
2014-10-01
... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
... for OMB Review; Comment Request; Vendor Outreach Session Information Management System ACTION: Notice... Administration and Management (OASAM) sponsored information collection request (ICR) titled, ``Vendor Outreach Session Information Management System,'' to the Office of Management and Budget (OMB) for review and...
A model for international border management systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duggan, Ruth Ann
2008-09-01
To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.
Engineering Elegant Systems: Postulates, Principles, and Hypotheses of Systems Engineering
NASA Technical Reports Server (NTRS)
Watson, Michael D.
2018-01-01
Definition: System Engineering is the engineering discipline which integrates the system functions, system environment, and the engineering disciplines necessary to produce and/or operate an elegant system; Elegant System - A system that is robust in application, fully meeting specified and adumbrated intent, is well structured, and is graceful in operation. Primary Focus: System Design and Integration: Identify system couplings and interactions; Identify system uncertainties and sensitivities; Identify emergent properties; Manage the effectiveness of the system. Engineering Discipline Integration: Manage flow of information for system development and/or operations; Maintain system activities within budget and schedule. Supporting Activities: Process application and execution.
23 CFR 973.212 - Indian lands safety management system (SMS).
Code of Federal Regulations, 2010 CFR
2010-04-01
... implementation of public information and education activities on safety needs, programs, and countermeasures... 23 Highways 1 2010-04-01 2010-04-01 false Indian lands safety management system (SMS). 973.212... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS...
Extend Instruction outside the Classroom: Take Advantage of Your Learning Management System
ERIC Educational Resources Information Center
Jensen, Lauren A.
2010-01-01
Numerous institutions of higher education have implemented a learning management system (LMS) or are considering doing so. This web-based software package provides self-service and quick (often personalized) access to content in a dynamic environment. Learning management systems support administrative, reporting, and documentation activities. LMSs…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... Management System (FAAAMS) AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice and request for... Acquisition Management System establishes policies and internal procedures for FAA acquisition. The... Acquisition Management System (FAAAMS). Form Numbers: 85 forms available at http://fast.faa.gov/Procurement...
Survey of standards applicable to a database management system
NASA Technical Reports Server (NTRS)
Urena, J. L.
1981-01-01
Industry, government, and NASA standards, and the status of standardization activities of standards setting organizations applicable to the design, implementation and operation of a data base management system for space related applications are identified. The applicability of the standards to a general purpose, multimission data base management system is addressed.
Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory
NASA Astrophysics Data System (ADS)
Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi
Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.
Application of BIM technology in green building material management system
NASA Astrophysics Data System (ADS)
Zhineng, Tong
2018-06-01
The current green building materials management system in China's construction industry is not perfect, and there are still many shortcomings. Active construction of green building materials management system based on BIM technology, combined with the characteristics of green building materials and its relationship with BIM technology application, is urgently needed to better realize the scientific management of green building materials.
Microgravity Fluid Management Symposium
NASA Technical Reports Server (NTRS)
1987-01-01
The NASA Microgravity Fluid Management Symposium, held at the NASA Lewis Research Center, September 9 to 10, 1986, focused on future research in the microgravity fluid management field. The symposium allowed researchers and managers to review space applications that require fluid management technology, to present the current status of technology development, and to identify the technology developments required for future missions. The 19 papers covered three major categories: (1) fluid storage, acquisition, and transfer; (2) fluid management applications, i.e., space power and thermal management systems, and environmental control and life support systems; (3) project activities and insights including two descriptions of previous flight experiments and a summary of typical activities required during development of a shuttle flight experiment.
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Control Systems for Information Systems Development Projects (Part I)
ERIC Educational Resources Information Center
Dickson, Gary W.
1970-01-01
Discusses control of management information systems and finds a similarity in management of research and development activity. Part II will appear in AEDS Journal, Volume 4, number 2, December 1970. (JF)
Crisis management systems: staff nurses demand more support from their supervisors.
Tzeng, Huey-Ming; Yin, Chang-Yi
2008-08-01
This study illustrates the contributions of the necessity, comprehensiveness, and difference (between necessity and comprehensiveness) levels of crisis management systems to participants' general satisfaction with their working institutions' nursing-related crisis management activities. Crisis management systems include strategic, technical/structural, assessment, public communication, and psychological/cultural aspects. An effective institutional crisis management system might help to decrease the number of incidents related to medical disputes or to prevent a crisis from worsening and becoming disastrous. A cross-sectional survey was administered during a nursing conference held in Taipei, Taiwan, on June 27, 2005. Two hundred ninety questionnaires were distributed, and 121 were retrieved (response rate, 41.7%; nursing administrators and staff). Univariate and multivariate analyses were performed. Ordinal logistic regression analyses show that being a public hospital managed by the government and having more difference on the strategic aspect between the necessity and comprehensiveness levels contribute to lower satisfaction with nursing-related crisis management activities (Nagelkerke R(2) = .441). In addition, staff nurses perceive higher necessity levels on all five aspects compared to nursing administrators. This study provides important insights into how the policies and activities of a medical institution's crisis management system can be prioritized and implemented. It is also important for students in nursing programs and for currently employed nurses to learn how to manage disputes related to nursing practice, so that early resolution can be achieved and crises can be avoided. These results suggest that staff nurses demand more support from their supervisors.
Information Security Management - Part Of The Integrated Management System
NASA Astrophysics Data System (ADS)
Manea, Constantin Adrian
2015-07-01
The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security
Get It Right First Time: A Beginner's Guide to Document Management.
ERIC Educational Resources Information Center
Hayes, Mike
1997-01-01
Document management (DM) systems capture, store, index, retrieve, route, distribute, and archive information in organizations. Discusses "passive" electronic libraries and "active" systems; characteristics of effective systems; implementing a system; fitting a new system to an existing infrastructure; budgets; system…
41 CFR 101-6.2103 - What programs and activities of GSA are subject to these regulations?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true What programs and... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS...? The Administrator publishes in the Federal Register a list of GSA's programs and activities that are...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Medicaid Management Information Systems (MMISs) meet certain defined standards and conditions in terms of.... Background A. The Current State of the Medicaid Management Information System (MMIS) A Medicaid management... Medicaid claims from providers and to retrieve and produce utilization data and management information...
Application of expert systems in project management decision aiding
NASA Technical Reports Server (NTRS)
Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David
1987-01-01
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.
[Blood transfusion and supply chain management safety].
Quaranta, Jean-François; Caldani, Cyril; Cabaud, Jean-Jacques; Chavarin, Patricia; Rochette-Eribon, Sandrine
2015-02-01
The level of safety attained in blood transfusion now makes this a discipline better managed care activities. This was achieved both by scientific advances and policy decisions regulating and supervising the activity, as well as by the quality system, which we recall that affects the entire organizational structure, responsibilities, procedures, processes and resources in place to achieve quality management. So, an effective quality system provides a framework within which activities are established, performed in a quality-focused way and continuously monitored to improve outcomes. This system quality has to irrigate all the actors of the transfusion, just as much the establishments of blood transfusion than the health establishments. Copyright © 2014 Elsevier Masson SAS. All rights reserved.
NASA Technical Reports Server (NTRS)
Melcher, Kevin J.; Sowers, T. Shane; Maul, William A.
2005-01-01
The constraints of future Exploration Missions will require unique Integrated System Health Management (ISHM) capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays all require an ISHM system that can span distinct yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation, and support the Exploration Mission from beginning to end. NASA Glenn Research Center has developed and applied health management system technologies to aerospace propulsion systems for almost two decades. Lessons learned from past activities help define the approach to proper ISHM development: sensor selection- identifies sensor sets required for accurate health assessment; data qualification and validation-ensures the integrity of measurement data from sensor to data system; fault detection and isolation-uses measurements in a component/subsystem context to detect faults and identify their point of origin; information fusion and diagnostic decision criteria-aligns data from similar and disparate sources in time and use that data to perform higher-level system diagnosis; and verification and validation-uses data, real or simulated, to provide variable exposure to the diagnostic system for faults that may only manifest themselves in actual implementation, as well as faults that are detectable via hardware testing. This presentation describes a framework for developing health management systems and highlights the health management research activities performed by the Controls and Dynamics Branch at the NASA Glenn Research Center. It illustrates how those activities contribute to the development of solutions for Integrated System Health Management.
The Network Information Management System (NIMS) in the Deep Space Network
NASA Technical Reports Server (NTRS)
Wales, K. J.
1983-01-01
In an effort to better manage enormous amounts of administrative, engineering, and management data that is distributed worldwide, a study was conducted which identified the need for a network support system. The Network Information Management System (NIMS) will provide the Deep Space Network with the tools to provide an easily accessible source of valid information to support management activities and provide a more cost-effective method of acquiring, maintaining, and retrieval data.
OPERATIONS RESEARCH IN THE DESIGN OF MANAGEMENT INFORMATION SYSTEMS
management information systems is concerned with the identification and detailed specification of the information and data processing...of advanced data processing techniques in management information systems today, the close coordination of operations research and data systems activities has become a practical necessity for the modern business firm.... information systems in which mathematical models are employed as the basis for analysis and systems design. Operations research provides a
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... (Principles of Excellence Complaint System Intake) Activity Under OMB Review AGENCY: Veterans Benefits... to the Office of Management and Budget (OMB) for review and comment. The PRA submission describes the... Information and Regulatory Affairs, Office of Management and Budget, Attn: VA Desk Officer; 725 17th St. NW...
76 FR 64382 - Agency Information Collection Activities: Proposed Collection; Comments Requested
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... Collection Under Review: Office for Victims of Crime Trafficking Information Management System (TIMS). The... following information collection request to the Office of Management and Budget (OMB) for review and... Trafficking Information Management System (TIMS) Online. [[Page 64383
The healthy learner model for student chronic condition management--part I.
Erickson, Cecelia DuPlessis; Splett, Patricia L; Mullett, Sara Stoltzfus; Heiman, Mary Bielski
2006-12-01
A significant number of children have chronic health conditions that interfere with normal activities, including school attendance and active participation in the learning process. Management of students' chronic conditions is complex and requires an integrated system. Models to improve chronic disease management have been developed for the medical system and public health. Programs that address specific chronic disease management or coordinate school health services have been implemented in schools. Lacking is a comprehensive, integrated model that links schools, students, parents, health care, and other community providers. The Healthy Learner Model for chronic condition management identifies seven elements for creating, implementing, and sustaining an efficient and effective, comprehensive community-based system for improving the management of chronic conditions for school children. It has provided the framework for successful chronic condition management in an urban school district and is proposed for replication in other districts and communities.
A Wired Way to Rate Professors--and to Connect Them
ERIC Educational Resources Information Center
Young, Jeffrey R.
2009-01-01
This article reports on Blackboard, a course-management system used by the University of Maryland-Baltimore County to rate and track the "most active instructors" using the university's course-management system. Just about every college has such a system these days, designed to track assignments and manage online class discussions, but…
TheHiveDB image data management and analysis framework.
Muehlboeck, J-Sebastian; Westman, Eric; Simmons, Andrew
2014-01-06
The hive database system (theHiveDB) is a web-based brain imaging database, collaboration, and activity system which has been designed as an imaging workflow management system capable of handling cross-sectional and longitudinal multi-center studies. It can be used to organize and integrate existing data from heterogeneous projects as well as data from ongoing studies. It has been conceived to guide and assist the researcher throughout the entire research process, integrating all relevant types of data across modalities (e.g., brain imaging, clinical, and genetic data). TheHiveDB is a modern activity and resource management system capable of scheduling image processing on both private compute resources and the cloud. The activity component supports common image archival and management tasks as well as established pipeline processing (e.g., Freesurfer for extraction of scalar measures from magnetic resonance images). Furthermore, via theHiveDB activity system algorithm developers may grant access to virtual machines hosting versioned releases of their tools to collaborators and the imaging community. The application of theHiveDB is illustrated with a brief use case based on organizing, processing, and analyzing data from the publically available Alzheimer Disease Neuroimaging Initiative.
TheHiveDB image data management and analysis framework
Muehlboeck, J-Sebastian; Westman, Eric; Simmons, Andrew
2014-01-01
The hive database system (theHiveDB) is a web-based brain imaging database, collaboration, and activity system which has been designed as an imaging workflow management system capable of handling cross-sectional and longitudinal multi-center studies. It can be used to organize and integrate existing data from heterogeneous projects as well as data from ongoing studies. It has been conceived to guide and assist the researcher throughout the entire research process, integrating all relevant types of data across modalities (e.g., brain imaging, clinical, and genetic data). TheHiveDB is a modern activity and resource management system capable of scheduling image processing on both private compute resources and the cloud. The activity component supports common image archival and management tasks as well as established pipeline processing (e.g., Freesurfer for extraction of scalar measures from magnetic resonance images). Furthermore, via theHiveDB activity system algorithm developers may grant access to virtual machines hosting versioned releases of their tools to collaborators and the imaging community. The application of theHiveDB is illustrated with a brief use case based on organizing, processing, and analyzing data from the publically available Alzheimer Disease Neuroimaging Initiative. PMID:24432000
Managing data from remeasured plots: An evaluation of existing systems
John C. Byrne; Michael D. Sweet
1992-01-01
Proper management of the valuable data from remeasured (or permanent) forest growth plots with data base management systems (DBMS) can greatly add to their utility. Twelve desired features for such a system (activities that facilitate the storage, accuracy, and use of the data for analysis) are described and used to evaluate the 36 systems found by a survey conducted...
Management accounting for advanced technological environments.
Kaplan, R S
1989-08-25
Management accounting systems designed decades ago no longer provide timely, relevant information for companies in today's highly competitive environment. New operational control and performance measurement systems are recognizing the importance of direct measurement of quality, manufacturing lead times, flexibility, and customer responsiveness, as well as more accurate measures of the actual costs of consumed resources. Activity-based cost systems can assign the costs of indirect and support resources to the specific products and activities that benefit from these resources. Both operational control and activity-based systems represent new opportunities for improved managerial information in complex, technologically advanced environments.
A New Activity-Based Financial Cost Management Method
NASA Astrophysics Data System (ADS)
Qingge, Zhang
The standard activity-based financial cost management model is a new model of financial cost management, which is on the basis of the standard cost system and the activity-based cost and integrates the advantages of the two. It is a new model of financial cost management with more accurate and more adequate cost information by taking the R&D expenses as the accounting starting point and after-sale service expenses as the terminal point and covering the whole producing and operating process and the whole activities chain and value chain aiming at serving the internal management and decision.
Design of customer knowledge management system for Aglaonema Nursery in South Tangerang, Indonesia
NASA Astrophysics Data System (ADS)
Sugiarto, D.; Mardianto, I.; Dewayana, TS; Khadafi, M.
2017-12-01
The purpose of this paper is to describe the design of customer knowledge management system to support customer relationship management activities for an aglaonema nursery in South Tangerang, Indonesia. System. The steps were knowledge identification (knowledge about customer, knowledge from customer, knowledge for customer), knowledge capture, codification, analysis of system requirement and create use case and activity diagram. The result showed that some key knowledge were about supporting customer in plant care (know how) and types of aglaonema including with the prices (know what). That knowledge for customer then codified and shared in knowledge portal website integrated with social media. Knowledge about customer were about customers and their behaviour in purchasing aglaonema. Knowledge from customer were about feedback, favorite and customer experience. Codified knowledge were placed and shared using content management system based on wordpress.
A three-level atomicity model for decentralized workflow management systems
NASA Astrophysics Data System (ADS)
Ben-Shaul, Israel Z.; Heineman, George T.
1996-12-01
A workflow management system (WFMS) employs a workflow manager (WM) to execute and automate the various activities within a workflow. To protect the consistency of data, the WM encapsulates each activity with a transaction; a transaction manager (TM) then guarantees the atomicity of activities. Since workflows often group several activities together, the TM is responsible for guaranteeing the atomicity of these units. There are scalability issues, however, with centralized WFMSs. Decentralized WFMSs provide an architecture for multiple autonomous WFMSs to interoperate, thus accommodating multiple workflows and geographically-dispersed teams. When atomic units are composed of activities spread across multiple WFMSs, however, there is a conflict between global atomicity and local autonomy of each WFMS. This paper describes a decentralized atomicity model that enables workflow administrators to specify the scope of multi-site atomicity based upon the desired semantics of multi-site tasks in the decentralized WFMS. We describe an architecture that realizes our model and execution paradigm.
NASA Technical Reports Server (NTRS)
1973-01-01
Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
R and D Productivity: New Challenges for the US Space Program
NASA Technical Reports Server (NTRS)
Baskin, O. W. (Editor); Sullivan, L. J. (Editor)
1985-01-01
Various topics related to research and development activities applicable to their U.S. space program are discussed. Project management, automatic control technology, human resources, management information systems, computer aided design, systems engineering, and personnel management were among the topics covered.
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2014 CFR
2014-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2013 CFR
2013-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2011 CFR
2011-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
76 FR 58202 - TRICARE; TRICARE Sanction Authority for Third-Party Billing Agents
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
..., TRICARE Management Activity (TMA), or designee, with the authority to sanction third-party billing agents... instructions for submitting comments. Mail: Federal Docket Management System Office, 4800 Mark Center Drive.... Joy Saly, TRICARE Management Activity, Medical Benefits and Reimbursement Branch, telephone (303) 676...
A data management system to enable urgent natural disaster computing
NASA Astrophysics Data System (ADS)
Leong, Siew Hoon; Kranzlmüller, Dieter; Frank, Anton
2014-05-01
Civil protection, in particular natural disaster management, is very important to most nations and civilians in the world. When disasters like flash floods, earthquakes and tsunamis are expected or have taken place, it is of utmost importance to make timely decisions for managing the affected areas and reduce casualties. Computer simulations can generate information and provide predictions to facilitate this decision making process. Getting the data to the required resources is a critical requirement to enable the timely computation of the predictions. An urgent data management system to support natural disaster computing is thus necessary to effectively carry out data activities within a stipulated deadline. Since the trigger of a natural disaster is usually unpredictable, it is not always possible to prepare required resources well in advance. As such, an urgent data management system for natural disaster computing has to be able to work with any type of resources. Additional requirements include the need to manage deadlines and huge volume of data, fault tolerance, reliable, flexibility to changes, ease of usage, etc. The proposed data management platform includes a service manager to provide a uniform and extensible interface for the supported data protocols, a configuration manager to check and retrieve configurations of available resources, a scheduler manager to ensure that the deadlines can be met, a fault tolerance manager to increase the reliability of the platform and a data manager to initiate and perform the data activities. These managers will enable the selection of the most appropriate resource, transfer protocol, etc. such that the hard deadline of an urgent computation can be met for a particular urgent activity, e.g. data staging or computation. We associated 2 types of deadlines [2] with an urgent computing system. Soft-hard deadline: Missing a soft-firm deadline will render the computation less useful resulting in a cost that can have severe consequences Hard deadline: Missing a hard deadline renders the computation useless and results in full catastrophic consequences. A prototype of this system has a REST-based service manager. The REST-based implementation provides a uniform interface that is easy to use. New and upcoming file transfer protocols can easily be extended and accessed via the service manager. The service manager interacts with the other four managers to coordinate the data activities so that the fundamental natural disaster urgent computing requirement, i.e. deadline, can be fulfilled in a reliable manner. A data activity can include data storing, data archiving and data storing. Reliability is ensured by the choice of a network of managers organisation model[1] the configuration manager and the fault tolerance manager. With this proposed design, an easy to use, resource-independent data management system that can support and fulfill the computation of a natural disaster prediction within stipulated deadlines can thus be realised. References [1] H. G. Hegering, S. Abeck, and B. Neumair, Integrated management of networked systems - concepts, architectures, and their operational application, Morgan Kaufmann Publishers, 340 Pine Stret, Sixth Floor, San Francisco, CA 94104-3205, USA, 1999. [2] H. Kopetz, Real-time systems design principles for distributed embedded applications, second edition, Springer, LLC, 233 Spring Street, New York, NY 10013, USA, 2011. [3] S. H. Leong, A. Frank, and D. Kranzlmu¨ ller, Leveraging e-infrastructures for urgent computing, Procedia Computer Science 18 (2013), no. 0, 2177 - 2186, 2013 International Conference on Computational Science. [4] N. Trebon, Enabling urgent computing within the existing distributed computing infrastructure, Ph.D. thesis, University of Chicago, August 2011, http://people.cs.uchicago.edu/~ntrebon/docs/dissertation.pdf.
Applications of Fisher Information to the Management of Sustainable Environmental Systems
NASA Astrophysics Data System (ADS)
Mayer, Audrey L.; Pawlowski, Christopher; Fath, Brian D.; Cabezas, Heriberto
All organisms alter their surroundings, and humans now have the ability to affect environments at increasingly larger temporal and spatial scales. Indeed, mechanical and engineering advances of the twentieth century greatly enhanced the scale of human activities. Among these are the use and redistribution of natural resources. Unfortunately, these activities can have unexpected and unintended consequences. Environmental systems often respond to these activities with diminished or lost capacity of natural function. Fortunately, environmental management can play an important role in ameliorating these negative effects. The aim is to promote sustainable development, i.e., enrichment of the lives of the majority of people without seriously degrading the diversity and richness of the environment. However, the management tools themselves often fall prey to the same narrow levels of perspective that generated the negative conditions. The challenge is to develop a system-level index, one that indicates the organization and direction of ecological system dynamics. This index could detect when the system is changing its configuration to a new, perhaps less desirable, dynamic regime and may be incorporated into a sustainable management plan for the system. In this chapter, we demonstrate the use of Fisher information (FI) as such an environmental system index.
The integrated scheduling system: A case study in project management
NASA Technical Reports Server (NTRS)
Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.
1989-01-01
A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... DEPARTMENT OF THE INTERIOR Bureau of Safety and Environmental Enforcement [Docket ID BSEE-2013-0005; OMB Control Number 1014-0017: 134E1700D2 EEEE500000 ET1SF0000.DAQ000] Information Collection Activities: Safety and Environmental Management Systems (SEMS); Proposed Collection; Comment Request Correction In notice document 2013-19416 appearing o...
ERIC Educational Resources Information Center
Park, Yeonjeong; Jo, Il-Hyun
2017-01-01
As the advance of learning technologies and analytics tools continues, learning management systems (LMSs) have been required to fulfil the growing expectations for smart learning. However, the reality regarding the level of technology integration in higher education differs considerably from such expectations or the speed of advances in…
System Design of the SWRL Financial System.
ERIC Educational Resources Information Center
Ikeda, Masumi
To produce various management and accounting reports in order to maintain control of SWRL (Southwest Regional Laboratory) operational and financial activities, a computer-based SWRL financial system was developed. The system design is outlined, and various types of system inputs described. The kinds of management and accounting reports generated…
Knowledge Innovation System: The Common Language.
ERIC Educational Resources Information Center
Rogers, Debra M. Amidon
1993-01-01
The Knowledge Innovation System is a management technique in which a networked enterprise uses knowledge flow as a collaborative advantage. Enterprise Management System-Architecture, which can be applied to collaborative activities, has five domains: economic, sociological, psychological, managerial, and technological. (SK)
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
"Helpful Hints" offers a quick overview of school emergency preparedness topics that are frequently the subject of inquiries. The National Incident Management System (NIMS) is a comprehensive system that improves tribal and local emergency response operations through the use of the Incident Command System (ICS) and the application of standardized…
40 CFR 272.751 - Indiana state-administered program: Final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Hazardous Waste Management System; Testing and Monitoring Activities (Checklist 158) 62 FR 32452 June 13... Management System; Carbamate Production, Identification and Listing of Hazardous Waste; Land Disposal... Indiana Department of Environmental Management, signed by the Commissioner of the IDEM on February 14...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... Request; Vendor Outreach Session Information Management System ACTION: Notice. SUMMARY: The Department of... Outreach Session Information Management System. DATES: Submit comments on or before May 9, 2011. ADDRESSES... for women-owned small businesses. Accordingly, the Vendor Outreach Session Information Management...
The Case for Case-Mix: A New Construct for Hospital Management
Plomann, Marilyn Peacock; Garzino, Fred R.
1981-01-01
Case-mix is a useful methodology for health care management, planning and control. It provides managers with a powerful tool by providing a framework for relating resource consumption profiles with specific treatment patterns. In the long run, it will assist hospital planners in analyzing the demands which different classes of patients bring to the hospital. Decisions concerning capital financing, facilities planning, new services, and the medical and financial implications of physician activities are more efficiently analyzed within a case-mix framework. In the near term, inventory management, staffing policies and the on-going need for the astute management of cash flow will be postively and decisively affected by the use of case-mix measures. The benefits derived from a case-mix system are not limited to hospitals possessing sophisticated management information systems. The case-mix methodology also provides a useful tool for hospitals with less advanced data processing systems and management practices in applying a variety of management science techniques to their planning and control activities.
Origami: An Active Learning Exercise for Scrum Project Management
ERIC Educational Resources Information Center
Sibona, Christopher; Pourreza, Saba; Hill, Stephen
2018-01-01
Scrum is a popular project management model for iterative delivery of software that subscribes to Agile principles. This paper describes an origami active learning exercise to teach the principles of Scrum in management information systems courses. The exercise shows students how Agile methods respond to changes in requirements during project…
Carneggie, David M.; Metz, Gary G.; Draeger, William C.; Thompson, Ralph J.
1991-01-01
The U.S. Geological Survey's Earth Resources Observation Systems (EROS) Data Center, the national archive for Landsat data, has 20 years of experience in acquiring, archiving, processing, and distributing Landsat and earth science data. The Center is expanding its satellite and earth science data management activities to support the U.S. Global Change Research Program and the National Aeronautics and Space Administration (NASA) Earth Observing System Program. The Center's current and future data management activities focus on land data and include: satellite and earth science data set acquisition, development and archiving; data set preservation, maintenance and conversion to more durable and accessible archive medium; development of an advanced Land Data Information System; development of enhanced data packaging and distribution mechanisms; and data processing, reprocessing, and product generation systems.
A practical approach for active camera coordination based on a fusion-driven multi-agent system
NASA Astrophysics Data System (ADS)
Bustamante, Alvaro Luis; Molina, José M.; Patricio, Miguel A.
2014-04-01
In this paper, we propose a multi-agent system architecture to manage spatially distributed active (or pan-tilt-zoom) cameras. Traditional video surveillance algorithms are of no use for active cameras, and we have to look at different approaches. Such multi-sensor surveillance systems have to be designed to solve two related problems: data fusion and coordinated sensor-task management. Generally, architectures proposed for the coordinated operation of multiple cameras are based on the centralisation of management decisions at the fusion centre. However, the existence of intelligent sensors capable of decision making brings with it the possibility of conceiving alternative decentralised architectures. This problem is approached by means of a MAS, integrating data fusion as an integral part of the architecture for distributed coordination purposes. This paper presents the MAS architecture and system agents.
Almalki, Manal; Gray, Kathleen; Sanchez, Fernando Martin
2015-01-01
Self-quantification is seen as an emerging paradigm for health care self-management. Self-quantification systems (SQS) can be used for tracking, monitoring, and quantifying health aspects including mental, emotional, physical, and social aspects in order to gain self-knowledge. However, there has been a lack of a systematic approach for conceptualising and mapping the essential activities that are undertaken by individuals who are using SQS in order to improve health outcomes. In this paper, we propose a new model of personal health information self-quantification systems (PHI-SQS). PHI-SQS model describes two types of activities that individuals go through during their journey of health self-managed practice, which are 'self-quantification' and 'self-activation'. In this paper, we aimed to examine thoroughly the first type of activity in PHI-SQS which is 'self-quantification'. Our objectives were to review the data management processes currently supported in a representative set of self-quantification tools and ancillary applications, and provide a systematic approach for conceptualising and mapping these processes with the individuals' activities. We reviewed and compared eleven self-quantification tools and applications (Zeo Sleep Manager, Fitbit, Actipressure, MoodPanda, iBGStar, Sensaris Senspod, 23andMe, uBiome, Digifit, BodyTrack, and Wikilife), that collect three key health data types (Environmental exposure, Physiological patterns, Genetic traits). We investigated the interaction taking place at different data flow stages between the individual user and the self-quantification technology used. We found that these eleven self-quantification tools and applications represent two major tool types (primary and secondary self-quantification systems). In each type, the individuals experience different processes and activities which are substantially influenced by the technologies' data management capabilities. Self-quantification in personal health maintenance appears promising and exciting. However, more studies are needed to support its use in this field. The proposed model will in the future lead to developing a measure for assessing the effectiveness of interventions to support using SQS for health self-management (e.g., assessing the complexity of self-quantification activities, and activation of the individuals).
2015-01-01
Background Self-quantification is seen as an emerging paradigm for health care self-management. Self-quantification systems (SQS) can be used for tracking, monitoring, and quantifying health aspects including mental, emotional, physical, and social aspects in order to gain self-knowledge. However, there has been a lack of a systematic approach for conceptualising and mapping the essential activities that are undertaken by individuals who are using SQS in order to improve health outcomes. In this paper, we propose a new model of personal health information self-quantification systems (PHI-SQS). PHI-SQS model describes two types of activities that individuals go through during their journey of health self-managed practice, which are 'self-quantification' and 'self-activation'. Objectives In this paper, we aimed to examine thoroughly the first type of activity in PHI-SQS which is 'self-quantification'. Our objectives were to review the data management processes currently supported in a representative set of self-quantification tools and ancillary applications, and provide a systematic approach for conceptualising and mapping these processes with the individuals' activities. Method We reviewed and compared eleven self-quantification tools and applications (Zeo Sleep Manager, Fitbit, Actipressure, MoodPanda, iBGStar, Sensaris Senspod, 23andMe, uBiome, Digifit, BodyTrack, and Wikilife), that collect three key health data types (Environmental exposure, Physiological patterns, Genetic traits). We investigated the interaction taking place at different data flow stages between the individual user and the self-quantification technology used. Findings We found that these eleven self-quantification tools and applications represent two major tool types (primary and secondary self-quantification systems). In each type, the individuals experience different processes and activities which are substantially influenced by the technologies' data management capabilities. Conclusions Self-quantification in personal health maintenance appears promising and exciting. However, more studies are needed to support its use in this field. The proposed model will in the future lead to developing a measure for assessing the effectiveness of interventions to support using SQS for health self-management (e.g., assessing the complexity of self-quantification activities, and activation of the individuals). PMID:26019809
TWRS technical baseline database manager definition document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Acree, C.D.
1997-08-13
This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.
20 CFR 641.856 - What functions and activities constitute administrative costs?
Code of Federal Regulations, 2012 CFR
2012-04-01
..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...
20 CFR 641.856 - What functions and activities constitute administrative costs?
Code of Federal Regulations, 2014 CFR
2014-04-01
..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...
20 CFR 641.856 - What functions and activities constitute administrative costs?
Code of Federal Regulations, 2011 CFR
2011-04-01
..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...
20 CFR 641.856 - What functions and activities constitute administrative costs?
Code of Federal Regulations, 2013 CFR
2013-04-01
..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... for OMB Review; Comment Request; Youthful Offender Grants Management Information System ACTION: Notice...) sponsored information collection request (ICR) proposal titled, ``Youthful Offender Grants Management Information System,'' to the Office of Management and Budget (OMB) for review and approval for use, in...
Rationalizing Management Information System Costs.
ERIC Educational Resources Information Center
Parden, Robert J.
This paper examines the proposition that management information systems (MIS) for colleges and universities are not achieving their original objectives of supporting better management decisions by providing more and better information in a more timely manner. As a consequence, the MIS activity should be reduced in scope, and standardized to…
Integrated Distribution Management System for Alabama Principal Investigator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schatz, Joe
2013-03-31
Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables datamore » access and enterprise application integration.« less
30 CFR 285.811 - When must I follow my Safety Management System?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...
ERIC Educational Resources Information Center
Stamm, Randy Lee
2013-01-01
The purpose of this mixed method research study was to examine relationships in student and instructor activity logs and student performance benchmarks specific to enabling early intervention by the instructor in a Learning Management System (LMS). Instructor feedback was collected through a survey instrument to demonstrate perceived importance of…
ERIC Educational Resources Information Center
Lai, Ah-Fur; Lai, Horng-Yih; Chuang, Wei-Hsiang; Wu, Zih-Heng
2015-01-01
Traditional outdoor learning activities such as inquiry-based learning in nature science encounter many dilemmas. Due to prompt development of mobile computing and widespread of mobile devices, mobile learning becomes a big trend on education. The main purpose of this study is to develop a mobile-learning management system for overcoming the…
White, Meagan; Shellenbarger, Teresa
E-learning provides an alternative approach to traditional professional development activities. A learning management system may help nursing professional development practitioners deliver content more efficiently and effectively; however, careful consideration is needed during planning and implementation. This article provides essential information in the selection and use of a learning management system for professional development.
Operational Management System for Regulated Water Systems
NASA Astrophysics Data System (ADS)
van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.
2012-04-01
Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.
75 FR 39696 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-12
...; Title of Information Collection: QualityNet Identity Management System (QIMS) Account Form; Use: The QualityNet Identity Management System (QIMS) account registration form must be completed by any new...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... System (GMS) ACTION: 30-Day Notice of Information Collection Under Review. The Department of Justice (DOJ... (1121-0243). (2) The Title of the Form/Collection: Community Partnership Grants Management System (GMS... system and award management system. GMS provides automated support throughout the award lifecycle. GMS...
DOT National Transportation Integrated Search
1990-01-01
This report summarizes the activities undertaken to implement a pavement management system at 56 general aviation airports coming under the jurisdiction of the Virginia Department of Aviation (VDOAV). The system, which is called Micro-PAVER, is a pro...
Major Elements and Issues in Performance Management System: A Literature Review
ERIC Educational Resources Information Center
Bae, Eul-Kyoo
2006-01-01
Due to rapidly changing business environment, HRD practitioners are unprecedentedly demanded to actively participate in improving organizational effectiveness as performance management specialist. The purpose of this study was to examine and discuss major elements and issues in performance management system through an extensive literature review…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
...- accessible knowledge-management system developed by TSA serving stakeholders--industry, port authorities... Management and Budget (OMB) for review and approval under the Paperwork Reduction Act (PRA). The ICR... comments. The first comment was from a contractor in the Infrastructure Protection Disaster Management...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... Information Management System (TIMS) ACTION: 60-Day Notice of Information Collection Under Review. The... information collection request to the Office of Management and Budget (OMB) for review and approval in...: Trafficking Information Management System (TIMS) Online. (3) The Agency form number, if any, and the...
Sandia National Laboratories California Waste Management Program Annual Report February 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brynildson, Mark E.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... automated case management system, to process complaints, compliance reviews, and to track the activities... comment on the new system of records. The new system report was submitted to the Office of Management and... a New Privacy Act System of Records, Title Eight Automated Paperless Office Tracking System (TEAPOTS...
[Management systems of the quality of health care in Quebec hospitals].
François, P
2001-03-31
The aim of this study was to take stock of the development of quality management systems in the Quebec health care services. The study relied on semi-guided interviews and on a documentary analysis. It concerned the structure and the activity of quality management in 4 Montreal university hospitals as well as on outside organizations dealing with quality of care. Quality management of the health care services is dealt with by council on health care accreditation and regional health and social services agencies. In hospitals, the quality of services is managed by structures created by the administration council and the top management: the piloting committee, the head of quality assurance, the executive committees and the multidisciplinary team or self-evaluation of the hospital, and development of plans for improvement. Other activities are management of complaints, users satisfaction evaluation and follow-up of indicators. This system of quality management of services is currently expanding. This change of paradigm leads to accepting the view of services users and to change quality management methods. Those methods have evolved from normative approach to a continuous quality improvement approach.
A Survey of Knowledge Management Research & Development at NASA Ames Research Center
NASA Technical Reports Server (NTRS)
Keller, Richard M.; Clancy, Daniel (Technical Monitor)
2002-01-01
This chapter catalogs knowledge management research and development activities at NASA Ames Research Center as of April 2002. A general categorization scheme for knowledge management systems is first introduced. This categorization scheme divides knowledge management capabilities into five broad categories: knowledge capture, knowledge preservation, knowledge augmentation, knowledge dissemination, and knowledge infrastructure. Each of nearly 30 knowledge management systems developed at Ames is then classified according to this system. Finally, a capsule description of each system is presented along with information on deployment status, funding sources, contact information, and both published and internet-based references.
Quality management, a directive approach to patient safety.
Ayuso-Murillo, Diego; de Andrés-Gimeno, Begoña; Noriega-Matanza, Concha; López-Suárez, Rafael Jesús; Herrera-Peco, Ivan
Nowadays the implementation of effective quality management systems and external evaluation in healthcare is a necessity to ensure not only transparency in activities related to health but also access to health and patient safety. The key to correctly implementing a quality management system is support from the managers of health facilities, since it is managers who design and communicate to health professionals the strategies of action involved in quality management systems. This article focuses on nursing managers' approach to quality management through the implementation of cycles of continuous improvement, participation of improvement groups, monitoring systems and external evaluation quality models (EFQM, ISO). The implementation of a quality management system will enable preventable adverse effects to be minimized or eliminated, and promote patient safety and safe practice by health professionals. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.
2014-12-02
NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. At left, is Mike Bolger, Ground Systems Development and Operations program manager. Not shown, but also participating were Mark Geyer, Orion program manager, and Todd May, Space Launch System program manager. Discussion topics include Mars and technology.
Configuration and Data Management Process and the System Safety Professional
NASA Technical Reports Server (NTRS)
Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)
2001-01-01
This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.
Dupuis, S; Fecci, J-L; Noyer, P; Lecarpentier, E; Chollet-Xémard, C; Margenet, A; Marty, J; Combes, X
2009-01-01
To assess economical impact after introduction of a bar coding pharmacy stock replenishment system in a prehospital emergency medical unit. Observational before and after study. A computer system using specific software and bare-code technology was introduced in the pre hospital emergency medical unit (Smur). Overall activity and costs related to pharmacy were recorded annually during two periods: the first 2 years period before computer system introduction and the second one during the 4 years following this system installation. The overall clinical activity increased by 10% between the two periods whereas pharmacy related costs continuously decreased after the start of pharmacy management computer system use. Pharmacy stock management was easier after introduction of the new stock replenishment system. The mean pharmacy related cost of one patient management was 13 Euros before and 9 Euros after the introduction of the system. The overall cost savings during the studied period was calculated to reach 134,000 Euros. The introduction of a specific pharmacy management computer system allowed to do important costs savings in a prehospital emergency medical unit.
12 CFR 600.4 - Organization of the Farm Credit Administration.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agency's chartering activities; and analyzes policy and strategic risks to the System. (6) Office of Management Services. The Office of Management Services provides financial management services. It administers the Agency's information resources management program; human resources management program; and...
12 CFR 600.4 - Organization of the Farm Credit Administration.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agency's chartering activities; and analyzes policy and strategic risks to the System. (6) Office of Management Services. The Office of Management Services provides financial management services. It administers the Agency's information resources management program; human resources management program; and...
75 FR 57035 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-17
... collection; Title of Information Collection: QualityNet Identity Management System (QIMS) Account Form; Use: The QualityNet Identity Management System (QIMS) account registration form must be completed by any...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
A computerized system to monitor resilience indicators in organizations.
de Carvalho, Paulo Victor Rodrigues; de Souza, Alan Pinheiro; Gomes, Jose Orlando
2012-01-01
The concepts developed by resilience engineering allow the understanding and monitoring the functioning of organizations and, particularly, to map the role of human activities, in success or in failure, enabling a better comprehension about how people make decisions in unexpected situations. The capture of information about human activities in the various organization levels gives managers a deeper real-time understanding of what is influencing the people performance, providing awareness of the factors that influence positively or negatively the organizational goals initially projected. The monitoring is important because the correct functioning of complex systems depends on the knowledge that people have to perform their activities and how the system environment provides tools that actually support the human performance. Therefore, organizations should look forward through precursors in operating signals to identify possible problems or solutions in the structure of tasks and activities, safety, quality, schedule, rework, and maintenance. We apply the concepts of resilience engineering to understand the organization by the analysis of cognitive tasks and activities. The aim is the development of a computerized system to monitor human activities to produce indicators to access system resilience. The validation of the approach was made in a real organization and the results show the successful applicability of the system. Based on findings obtained after the experiment of the system in a real organization, and managers and workers opinions, it was possible to show that the use of system provided an anticipated (real-time) perception about how activities are effectively being performed, allowing managers and workers to make decisions more consistent with daily problems, and also to anticipate solutions to cope with unexpected situations.
Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2014-01-01
This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...
Schulz, Elke; Schloter, Michael; Buscot, François; Hofrichter, Martin; Krüger, Dirk
2014-01-01
Leaf litter decomposition is the key ecological process that determines the sustainability of managed forest ecosystems, however very few studies hitherto have investigated this process with respect to silvicultural management practices. The aims of the present study were to investigate the effects of forest management practices on leaf litter decomposition rates, nutrient dynamics (C, N, Mg, K, Ca, P) and the activity of ligninolytic enzymes. We approached these questions using a 473 day long litterbag experiment. We found that age-class beech and spruce forests (high forest management intensity) had significantly higher decomposition rates and nutrient release (most nutrients) than unmanaged deciduous forest reserves (P<0.05). The site with near-to-nature forest management (low forest management intensity) exhibited no significant differences in litter decomposition rate, C release, lignin decomposition, and C/N, lignin/N and ligninolytic enzyme patterns compared to the unmanaged deciduous forest reserves, but most nutrient dynamics examined in this study were significantly faster under such near-to-nature forest management practices. Analyzing the activities of ligninolytic enzymes provided evidence that different forest system management practices affect litter decomposition by changing microbial enzyme activities, at least over the investigated time frame of 473 days (laccase, P<0.0001; manganese peroxidase (MnP), P = 0.0260). Our results also indicate that lignin decomposition is the rate limiting step in leaf litter decomposition and that MnP is one of the key oxidative enzymes of litter degradation. We demonstrate here that forest system management practices can significantly affect important ecological processes and services such as decomposition and nutrient cycling. PMID:24699676
Purahong, Witoon; Kapturska, Danuta; Pecyna, Marek J; Schulz, Elke; Schloter, Michael; Buscot, François; Hofrichter, Martin; Krüger, Dirk
2014-01-01
Leaf litter decomposition is the key ecological process that determines the sustainability of managed forest ecosystems, however very few studies hitherto have investigated this process with respect to silvicultural management practices. The aims of the present study were to investigate the effects of forest management practices on leaf litter decomposition rates, nutrient dynamics (C, N, Mg, K, Ca, P) and the activity of ligninolytic enzymes. We approached these questions using a 473 day long litterbag experiment. We found that age-class beech and spruce forests (high forest management intensity) had significantly higher decomposition rates and nutrient release (most nutrients) than unmanaged deciduous forest reserves (P<0.05). The site with near-to-nature forest management (low forest management intensity) exhibited no significant differences in litter decomposition rate, C release, lignin decomposition, and C/N, lignin/N and ligninolytic enzyme patterns compared to the unmanaged deciduous forest reserves, but most nutrient dynamics examined in this study were significantly faster under such near-to-nature forest management practices. Analyzing the activities of ligninolytic enzymes provided evidence that different forest system management practices affect litter decomposition by changing microbial enzyme activities, at least over the investigated time frame of 473 days (laccase, P<0.0001; manganese peroxidase (MnP), P = 0.0260). Our results also indicate that lignin decomposition is the rate limiting step in leaf litter decomposition and that MnP is one of the key oxidative enzymes of litter degradation. We demonstrate here that forest system management practices can significantly affect important ecological processes and services such as decomposition and nutrient cycling.
Future preparation of occupational health nurse managers.
Scalzi, C C; Wilson, D L; Ebert, R
1991-03-01
This article presents the results of a national survey of job activities of corporate level occupational health nurse managers. The survey was designed to identify the relative amount of time spent and importance attributed to specific areas of their current job. In general this sample tended to have more management experience and educational preparation than previously cited studies: over 50% had completed a graduate degree. The scores for importance and time spent were highly correlated. That is, occupational health corporate nurse managers seemed to allocate their time to job responsibilities they considered most important. Management activities related to policy, practice standards, quality assurance, staff development, and systems for client care delivery appear to represent the core responsibilities of occupational health nursing management. Curriculum recommendations for management positions in occupational health include: health policy, program planning, and evaluation; business strategy; applications of management information systems; quality assurance; and marketing.
Minimizing the Impacts of the Forest Road System
Johnny M. Grace
2003-01-01
Sediment movement from forest road systems is a major concern in forest management due to the degrading impacts of stream sedimentation. Controlling sediment movement from road systems is a key objective to achieve the goat of reducing the impact of forest management activities. Sediment control systems minimizing sediment travel distances downslope are likely...
77 FR 13337 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
... ``Part B'' of the QualityNet Identity Management System Account Form (CMS-10267; OCN: 0938-1050). Once the ESRD System Access Form is approved, the QualityNet Identity Management System (QIMS) Account Form... the ESRD systems through the creation of user IDs and passwords within the QualityNet Identity...
Lundström, Maria; Warren, Jim; Jones, Sara; Chung, Frank
2003-01-01
Much of chronic disease management depends on active partnership of consumer and provider. Our system promotes diabetes management through profiling and adaptive support of both consumer and provider. We use a University Podiatry Clinic and diabetes consumer information portal as inter-related contexts that share profile information.
Initial Perceptions of Open Higher Education Students with Learner Management Systems
ERIC Educational Resources Information Center
Altunoglu, Asu
2017-01-01
Learner management systems (LMS) are used in open education as a means of managing and recording e-learning facilities as well as improving student engagement. Students benefit from them to become active participants in the decision-making process of their own learning. This study aims to investigate the initial perceptions of students…
NASA Lewis Research Center low-gravity fluid management technology program
NASA Technical Reports Server (NTRS)
Aydelott, J. C.; Carney, M. J.; Hochstein, J. I.
1985-01-01
A history of the Lewis Research Center in space fluid management technology program is presented. Current programs which include numerical modeling of fluid systems, heat exchanger/radiator concept studies, and the design of the Cryogenic Fluid Management Facility are discussed. Recent analytical and experimental activities performed to support the Shuttle/Centaur development activity are highlighted.
2012-04-01
5. Realign the TRICARE Management Activity and establish a Joint Military Health Service Directorate to consolidate shared services and common...Directorate to consolidate shared services and common functions Realign TRICARE Management Activity and establish a TRICARE Health Plan Agency to...Uniformed Services University of the Health Sciences, (2) TRICARE health plan, (3) Health Management Support, and (4) Shared Services division
Activity Recognition for Personal Time Management
NASA Astrophysics Data System (ADS)
Prekopcsák, Zoltán; Soha, Sugárka; Henk, Tamás; Gáspár-Papanek, Csaba
We describe an accelerometer based activity recognition system for mobile phones with a special focus on personal time management. We compare several data mining algorithms for the automatic recognition task in the case of single user and multiuser scenario, and improve accuracy with heuristics and advanced data mining methods. The results show that daily activities can be recognized with high accuracy and the integration with the RescueTime software can give good insights for personal time management.
77 FR 11117 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... to multidimensional changes in the management or delivery of care or strategic alignment of system changes with an organization's business strategy. System redesign, if done successfully, will allow SN... site visit with senior medical center leaders, clinical managers and staff involved in system redesign...
An integrated drug prescription and distribution system: challenges and opportunities.
Lanssiers, R; Everaert, E; De Win, M; Van De Velde, R; De Clercq, H
2002-01-01
Using the hospital's drug prescription and distribution system as a guide, benefits and drawbacks of a medical activity management system that is tightly integrated with the supply chain management of a hospital will be discussed from the point of view of various participating healthcare actors.
Staccini, P; Quaranta, J F; Staccini-Myx, A; Veyres, P; Jambou, P
2003-09-01
Nowadays, information system is recognised as one of the key points of the management strategy. An information system is regarded conceptualised as a mean to link 3 aspects of a firm (structure, organisation rules and staff). Its design and implementation have to meet the objectives of medical and economical evaluation, especially risk management objectives. In order to identify, analyse, reduce and prevent the occurrence of adverse events, and also to measure the efficacy and efficiency of the production of care services, the design of information systems should be based on a process analysis in order to describe and classify all the working practices within the hospital. According to various methodologies (usually top-down analysis), each process can be divided into activities. Each activity (especially each care activity) can be described according to its potential risks and expected results. For care professionals performing a task, the access to official or internal guidelines and the adverse events reporting forms has also to be defined. Putting together all the elements of such a process analysis will contribute to integrate, into daily practice, the management of risks, supported by the information system.
NASA Astrophysics Data System (ADS)
Rytov, M. Yu; Leksikov, E. V.; Sakalo, V. I.; Kovalev, P. A.
2017-01-01
At the moment the domestic policy of the Russian Federation is being formed in difficult conditions of a foreign policy situation. The regional policy is built on the platform of alignment of social and economic development indices. To maintain the activity of regional social and economic systems is important for the management system of executive authorities (EA), including regional ones. To ensure feasibility of public administration, it is necessary to have vitally active social and economic systems.
Framework for a comprehensive bridge management and information system.
DOT National Transportation Integrated Search
2011-11-01
"The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...
2014-12-02
NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager; and Mark Geyer, Orion program manager. Across from them, in the plaid shirt is Todd May, Space Launch System program manager. Discussion topics include Mars and technology.
2014-12-02
NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager. Also participating, but not shown in the photo is Todd May, Space Launch System program manager. Discussion topics include Mars and technology.
Development of Integrated Information System for Travel Bureau Company
NASA Astrophysics Data System (ADS)
Karma, I. G. M.; Susanti, J.
2018-01-01
Related to the effectiveness of decision-making by the management of travel bureau company, especially by managers, information serves frequent delays or incomplete. Although already computer-assisted, the existing application-based is used only handle one particular activity only, not integrated. This research is intended to produce an integrated information system that handles the overall operational activities of the company. By applying the object-oriented system development approach, the system is built with Visual Basic. Net programming language and MySQL database package. The result is a system that consists of 4 (four) separated program packages, including Reservation System, AR System, AP System and Accounting System. Based on the output, we can conclude that this system is able to produce integrated information that related to the problem of reservation, operational and financial those produce up-to-date information in order to support operational activities and decisionmaking process by related parties.
ERIC Educational Resources Information Center
Ismail, Noor Azizi
2010-01-01
Purpose: The purpose of this paper is to discuss how activity-based costing (ABC) technique can be applied in the context of higher education institutions. It also discusses the obstacles and challenges to the successful implementation of activity-based management (ABM) in the higher education environment. Design/methodology/approach: This paper…
Haser, Grace C.; Tuttle, R. Michael; Su, Henry K.; Alon, Eran E.; Bergman, Donald; Bernet, Victor; Brett, Elise; Cobin, Rhoda; Dewey, Eliza H.; Doherty, Gerard; Dos Reis, Laura L.; Harris, Jeffrey; Klopper, Joshua; Lee, Stephanie L.; Levine, Robert A.; Lepore, Stephen J.; Likhterov, Ilya; Lupo, Mark A.; Machac, Josef; Mechanick, Jeffrey I.; Mehra, Saral; Milas, Mira; Orloff, Lisa A.; Randolph, Gregory; Revenson, Tracey A.; Roberts, Katherine J.; Ross, Douglas S.; Rowe, Meghan E.; Smallridge, Robert C.; Terris, David; Tufano, Ralph P.; Urken, Mark L.
2017-01-01
Objective The dramatic increase in papillary thyroid carcinoma (PTC) is primarily a result of early diagnosis of small cancers. Active surveillance is a promising management strategy for papillary thyroid microcarcinomas (PTMCs). However, as this management strategy gains traction in the U.S., it is imperative that patients and clinicians be properly educated, patients be followed for life, and appropriate tools be identified to implement the strategy. Methods We review previous active surveillance studies and the parameters used to identify patients who are good candidates for active surveillance. We also review some of the challenges to implementing active surveillance protocols in the U.S. and discuss how these might be addressed. Results Trials of active surveillance support nonsurgical management as a viable and safe management strategy. However, numerous challenges exist, including the need for adherence to protocols, education of patients and physicians, and awareness of the impact of this strategy on patient psychology and quality of life. The Thyroid Cancer Care Collaborative (TCCC) is a portable record keeping system that can manage a mobile patient population undergoing active surveillance. Conclusion With proper patient selection, organization, and patient support, active surveillance has the potential to be a long-term management strategy for select patients with PTMC. In order to address the challenges and opportunities for this approach to be successfully implemented in the U.S., it will be necessary to consider psychological and quality of life, cultural differences, and the patient’s clinical status. PMID:26799628
Organizational entrepreneurship and administrators of hospitals: case study of Iran.
Raadabadi, Mehdi; Fayaz-Bakhsh, Ahmad; Nazari, Aslan; Mousavi, Seyed Masood; Fayaz-Bakhsh, Mohammadali
2014-04-11
Due to rapid changes of technology and scientific advances in health systems and need for fast planning in health care, entrepreneurial spirit among employers and employees is a crucial element. According to the field of entrepreneurship research has not been solved and where learning and innovation for healthcare organizations due to the nature of the work required. This study aims to examine the entrepreneurial activities within the hospitals affiliated to Tehran University of Medical Sciences, Iran. To achieve the aim of the study, a questionnaire containing 29 items regarding the areas of innovation, creative behavior, flexibility, empowerment, rewarding systems and the management support was distributed among the hospitals' managers. Establishment of a culture of entrepreneurship in healthcare organizations led to the development unit controlled, changing the culture of the hospital. The analysis of the data showed that the majority of the managers agreed with all five areas of entrepreneurship namely the existence of innovation and innovative behavior, flexibility, decision making, rewarding and encouraging system, as well as management supportive system of personnel's new ideas. In fact, the managers generally had positive attitude towards entrepreneurship in their organizations The Pearson correlation test also showed that there is a significant relationship between the areas of entrepreneurship and the managers' age as well as their working experience (P<0.05). Entrepreneurial activities in healthcare can be improved through providing a suitable environment, adjusting reward and encouragement systems, giving more authority to subordinates, promoting awareness and education, and mobilizing managers to attract appropriate opportunities for organization. Further active involvement of employees, more stable in front of changes and increased ability managers to capture opportunities in domestic and foreign situation.
DOT National Transportation Integrated Search
2012-10-01
Active Traffic Management (ATM) applications, such as variable speed limits, queue warning systems, and dynamic : ramp metering, have been shown to offer mobility and safety benefits. Yet because they differ from conventional capacity : investments i...
41 CFR 102-74.245 - Who makes the decision to activate the Occupant Emergency Organization?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Occupant Emergency Program § 102-74.245... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who makes the decision...
"And DPSIR begat DAPSI(W)R(M)!" - A unifying framework for marine environmental management.
Elliott, M; Burdon, D; Atkins, J P; Borja, A; Cormier, R; de Jonge, V N; Turner, R K
2017-05-15
The marine environment is a complex system formed by interactions between ecological structure and functioning, physico-chemical processes and socio-economic systems. An increase in competing marine uses and users requires a holistic approach to marine management which considers the environmental, economic and societal impacts of all activities. If managed sustainably, the marine environment will deliver a range of ecosystem services which lead to benefits for society. In order to understand the complexity of the system, the DPSIR (Driver-Pressure-State-Impact-Response) approach has long been a valuable problem-structuring framework used to assess the causes, consequences and responses to change in a holistic way. Despite DPSIR being used for a long time, there is still confusion over the definition of its terms and so to be appropriate for current marine management, we contend that this confusion needs to be addressed. Our viewpoint advocates that DPSIR should be extended to DAPSI(W)R(M) (pronounced dap-see-worm) in which Drivers of basic human needs require Activities which lead to Pressures. The Pressures are the mechanisms of State change on the natural system which then leads to Impacts (on human Welfare). Those then require Responses (as Measures). Furthermore, because of the complexity of any managed sea area in terms of multiple Activities, there is the need for a linked-DAPSI(W)R(M) framework, and then the connectivity between marine ecosystems and ecosystems in the catchment and further at sea, requires an interlinked, nested-DAPSI(W)R(M) framework to reflect the continuum between adjacent ecosystems. Finally, the unifying framework for integrated marine management is completed by encompassing ecosystem structure and functioning, ecosystem services and societal benefits. Hence, DAPSI(W)R(M) links the socio-ecological system of the effects of changes to the natural system on the human uses and benefits of the marine system. However, to deliver these sustainably in the light of human activities requires a Risk Assessment and Risk Management framework; the ISO-compliant Bow-Tie method is used here as an example. Finally, to secure ecosystem health and economic benefits such as Blue Growth, successful, adaptive and sustainable marine management Responses (as Measures) are delivered using the 10-tenets, a set of facets covering all management disciplines and approaches. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.
20 CFR 641.856 - What functions and activities constitute costs of administration?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and purchasing functions; (iii) Property management functions; (iv) Personnel management functions; (v) Payroll... example, personnel, procurement, purchasing, property management, accounting, and payroll systems...
Integrated farm sustainability assessment for the environmental management of rural activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stachetii Rodrigues, Geraldo, E-mail: stacheti@cnpma.embrapa.b; Aparecida Rodrigues, Izilda, E-mail: isis@cnpma.embrapa.b; Almeida Buschinelli, Claudio Cesar de, E-mail: buschi@cnpma.embrapa.b
2010-07-15
Farmers have been increasingly called upon to respond to an ongoing redefinition in consumers' demands, having as a converging theme the search for sustainable production practices. In order to satisfy this objective, instruments for the environmental management of agricultural activities have been sought out. Environmental impact assessment methods are appropriate tools to address the choice of technologies and management practices to minimize negative effects of agricultural development, while maximizing productive efficiency, sound usage of natural resources, conservation of ecological assets and equitable access to wealth generation means. The 'system for weighted environmental impact assessment of rural activities' (APOIA-NovoRural) presented inmore » this paper is organized to provide integrated farm sustainability assessment according to quantitative environmental standards and defined socio-economic benchmarks. The system integrates sixty-two objective indicators in five sustainability dimensions - (i) Landscape ecology, (ii) Environmental quality (atmosphere, water and soil), (iii) Sociocultural values, (iv) Economic values, and (v) Management and administration. Impact indices are expressed in three integration levels: (i) specific indicators, that offer a diagnostic and managerial tool for farmers and rural administrators, by pointing out particular attributes of the rural activities that may be failing to comply with defined environmental performance objectives; (ii) integrated sustainability dimensions, that show decision-makers the major contributions of the rural activities toward local sustainable development, facilitating the definition of control actions and promotion measures; and (iii) aggregated sustainability index, that can be considered a yardstick for eco-certification purposes. Nine fully documented case studies carried out with the APOIA-NovoRural system, focusing on different scales, diverse rural activities/farming systems, and contrasting spatial/territorial contexts, attest to the malleability of the method and its applicability as an integrated farm environmental management tool.« less
50 CFR 35.8 - Forest management.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Forest management. 35.8 Section 35.8... NATIONAL WILDLIFE REFUGE SYSTEM WILDERNESS PRESERVATION AND MANAGEMENT General Rules § 35.8 Forest management. Forest management activities in a wilderness unit will be directed toward allowing natural...
50 CFR 35.8 - Forest management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Forest management. 35.8 Section 35.8... NATIONAL WILDLIFE REFUGE SYSTEM WILDERNESS PRESERVATION AND MANAGEMENT General Rules § 35.8 Forest management. Forest management activities in a wilderness unit will be directed toward allowing natural...
50 CFR 35.8 - Forest management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 8 2011-10-01 2011-10-01 false Forest management. 35.8 Section 35.8... NATIONAL WILDLIFE REFUGE SYSTEM WILDERNESS PRESERVATION AND MANAGEMENT General Rules § 35.8 Forest management. Forest management activities in a wilderness unit will be directed toward allowing natural...
50 CFR 35.8 - Forest management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false Forest management. 35.8 Section 35.8... NATIONAL WILDLIFE REFUGE SYSTEM WILDERNESS PRESERVATION AND MANAGEMENT General Rules § 35.8 Forest management. Forest management activities in a wilderness unit will be directed toward allowing natural...
50 CFR 35.8 - Forest management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Forest management. 35.8 Section 35.8... NATIONAL WILDLIFE REFUGE SYSTEM WILDERNESS PRESERVATION AND MANAGEMENT General Rules § 35.8 Forest management. Forest management activities in a wilderness unit will be directed toward allowing natural...
Performance measurement: integrating quality management and activity-based cost management.
McKeon, T
1996-04-01
The development of an activity-based management system provides a framework for developing performance measures integral to quality and cost management. Performance measures that cross operational boundaries and embrace core processes provide a mechanism to evaluate operational results related to strategic intention and internal and external customers. The author discusses this measurement process that allows managers to evaluate where they are and where they want to be, and to set a course of action that closes the gap between the two.
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviewsmore » the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.« less
Development of a system of indicators for sustainable port management.
Peris-Mora, E; Diez Orejas, J M; Subirats, A; Ibáñez, S; Alvarez, P
2005-12-01
The 1998 project ECOPORT, "Towards A Sustainable Transport Network", developed by the Valencia Port Authority (VPA), established the bases for implementing an Environmental Management System (EMS) in industrial harbours. The use of data and information shall always be required to develop an efficient EMS. The objective of the present research (INDAPORT) study is to propose a system of sustainable environmental management indicators to be used by any port authorities. All activities performed within a port area are analysed for any potential environmental impacts and risks. An environmental analysis of port activities has been carried out with the objective of designing the indicators system. Twenty-one corresponding activities have been identified for large industrial ports. Subsequently, the same methodology developed to date will be later applied to other Spanish and European ports. The study has been developed by using an original system and a methodology, which simultaneously use stage diagrams and systemic models (material and energy flow charts). Multi-criteria analysis techniques were used to evaluate potential impacts (identification of factors and evaluation of impacts).
36 CFR 219.17 - Interaction with private landowners.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for... national forests or grasslands to identify: (a) Local knowledge; (b) Potential actions and partnership activities; (c) Potential conditions and activities on the adjacent lands that may affect management of...
36 CFR 219.17 - Interaction with private landowners.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for... national forests or grasslands to identify: (a) Local knowledge; (b) Potential actions and partnership activities; (c) Potential conditions and activities on the adjacent lands that may affect management of...
Defense Acquisition University Program Managers Tool Kit
2011-01-01
46–47 Goal 2: Affordable System Operational Effectiveness (SOE) ................................ 48 Goal... System Development and Demonstration 6.6 BA 6 RDT&E Management Support --- BA 7 Operational System Development *NOTE: Although similar, titles of the...addition, the “ Operational System Development” Budget Activity for RDT&E BA 7 is not considered MFP 6. While correctly funded with RDT&E dollars
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nutt, M.; Nuclear Engineering Division
2010-05-25
The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of themore » Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.« less
Research on the full life cycle management system of smart electric energy meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Huang, Rui; Shen, Liman; Guo, Dingying; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Renheng, Xu
2018-02-01
At present, China’s smart electric energy meter life management is started from the procurement and acceptance. The related monitoring and management of the manufacturing sector has not yet been carried out. This article applies RFID technology and network cloud platform to full life cycle management system of smart electric energy meters, builds this full life cycle management system including design and manufacturing, process control, measurement and calibration testing, storage management, user acceptance, site operation, maintenance scrap and other aspects. Exploring smart electric energy meters on-line and off-line communication by the application of active RFID communication functions, and the actual functional application such as local data exchange and instrument calibration. This system provides technical supports on power demand side management and the improvement of smart electric energy meter reliability evaluation system.
Lundström, Maria; Warren, Jim; Jones, Sara; Chung, Frank
2003-01-01
Much of chronic disease management depends on active partnership of consumer and provider. Our system promotes diabetes management through profiling and adaptive support of both consumer and provider. We use a University Podiatry Clinic and diabetes consumer information portal as inter-related contexts that share profile information. PMID:14728425
2014-12-02
From left, Mike Bolger, Ground Systems Development and Operations program manager; and Mark Geyer, Orion program manager, participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Not shown is Todd May, Space Launch System program manager. Discussion topics include Mars and technology.
Management of health system reform: a view of changes within New Zealand.
Ritchie, D
1998-08-01
This paper reports on the context and process of health system reform in New Zealand. The study is based on interviews conducted with 31 managers from three Crown Health Enterprises (publicly funded hospital-based health care organizations). A number of countries with publicly funded health services (e.g., UK, Australia and New Zealand) have sought to shift from the traditional 'passive' health management style (using transactional management skills to balance historically-based expenditure budgets) to 'active' transformational leadership styles that reflect a stronger 'private sector' orientation (requiring active management of resources--including a return on 'capital' investment, identification of costs and returns on 'product lines', 'marketing' a 'product mix', reducing non-core activities and overhead costs, and a closer relationship with 'shareholders', suppliers and customers/clients). Evidence of activities and processes associated with transformational leadership are identified. Success of the New Zealand health reforms will be determined by the approach the new managers adopt to improve their organization's performance. Transformational leadership has been frequently linked to the successful implementation of significant organizational change in other settings (Kurz et al., 1988; Dunphy and Stace, 1990) but it is too early to assess whether this is applicable in a health care context.
2014-12-02
CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. At left, is Mike Bolger, Ground Systems Development and Operations program manager. Not shown, but also participating were Mark Geyer, Orion program manager, and Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin
Multiple system modelling of waste management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eriksson, Ola, E-mail: ola.eriksson@hig.se; Department of Building, Energy and Environmental Engineering, University of Gaevle, SE 801 76 Gaevle; Bisaillon, Mattias, E-mail: mattias.bisaillon@profu.se
2011-12-15
Highlights: > Linking of models will provide a more complete, correct and credible picture of the systems. > The linking procedure is easy to perform and also leads to activation of project partners. > The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions havemore » developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.« less
A cost management model for hospital food and nutrition in a public hospital.
Neriz, Liliana; Núñez, Alicia; Ramis, Francisco
2014-11-13
In Chile, the use of costing systems in the public sector is limited. The Ministry of Health requires hospitals to manage themselves with the aim of decentralizing health care services and increasing their quality. However, self-management with a lack of accounting information is almost impossible. On the other hand, nutrition department costs have barely been studied before, and there are no studies specifically for activity based costing (ABC) systems. ABC focuses on the process and traces health care activities to gain a more accurate measurement of the object costs and the financial performance of an organization. This paper uses ABC in a nutrition unit of a public hospital of high complexity to determine costs associated with the different meals for inpatients. The paper also provides an activity based management (ABM) analysis for this unit. The results show positive effects on the reduction of costs for the nutrition department after implementing ABC/ABM. Therefore, there are opportunities to improve the profitability of the area and the results could also be replicated to other areas in the hospital. ABC shed light on the amount of nutritionist time devoted to completing paperwork, and as a result, system changes were introduced to reduce this burden and allow them to focus on more relevant activities. Additional efficiencies were achieved through the elimination of non-value adding activities and automation of reports. ABC reduced the cost of the nutrition department and could produce similar results in other areas of the hospital. This is a practical application of a financial management tool, ABC, which would be useful for hospital managers to reduce costs and improve the management of the unit. This paper takes ABC and examines its use in an area, which has had little exposure to the benefits of this tool.
Modeling Off-Nominal Behavior in SysML
NASA Technical Reports Server (NTRS)
Day, John C.; Donahue, Kenneth; Ingham, Michel; Kadesch, Alex; Kennedy, Andrew K.; Post, Ethan
2012-01-01
Specification and development of fault management functionality in systems is performed in an ad hoc way - more of an art than a science. Improvements to system reliability, availability, safety and resilience will be limited without infusion of additional formality into the practice of fault management. Key to the formalization of fault management is a precise representation of off-nominal behavior. Using the upcoming Soil Moisture Active-Passive (SMAP) mission for source material, we have modeled the off-nominal behavior of the SMAP system during its initial spin-up activity, using the System Modeling Language (SysML). In the course of developing these models, we have developed generic patterns for capturing off-nominal behavior in SysML. We show how these patterns provide useful ways of reasoning about the system (e.g., checking for completeness and effectiveness) and allow the automatic generation of typical artifacts (e.g., success trees and FMECAs) used in system analyses.
Energy management and control of active distribution systems
NASA Astrophysics Data System (ADS)
Shariatzadeh, Farshid
Advancements in the communication, control, computation and information technologies have driven the transition to the next generation active power distribution systems. Novel control techniques and management strategies are required to achieve the efficient, economic and reliable grid. The focus of this work is energy management and control of active distribution systems (ADS) with integrated renewable energy sources (RESs) and demand response (DR). Here, ADS mean automated distribution system with remotely operated controllers and distributed energy resources (DERs). DER as active part of the next generation future distribution system includes: distributed generations (DGs), RESs, energy storage system (ESS), plug-in hybrid electric vehicles (PHEV) and DR. Integration of DR and RESs into ADS is critical to realize the vision of sustainability. The objective of this dissertation is the development of management architecture to control and operate ADS in the presence of DR and RES. One of the most challenging issues for operating ADS is the inherent uncertainty of DR and RES as well as conflicting objective of DER and electric utilities. ADS can consist of different layers such as system layer and building layer and coordination between these layers is essential. In order to address these challenges, multi-layer energy management and control architecture is proposed with robust algorithms in this work. First layer of proposed multi-layer architecture have been implemented at the system layer. Developed AC optimal power flow (AC-OPF) generates fair price for all DR and non-DR loads which is used as a control signal for second layer. Second layer controls DR load at buildings using a developed look-ahead robust controller. Load aggregator collects information from all buildings and send aggregated load to the system optimizer. Due to the different time scale at these two management layers, time coordination scheme is developed. Robust and deterministic controllers are developed to maximize the energy usage from rooftop photovoltaic (PV) generation locally and minimize heat-ventilation and air conditioning (HVAC) consumption while maintaining inside temperature within comfort zone. The performance of the developed multi-layer architecture has been analyzed using test case studies and results show the robustness of developed controller in the presence of uncertainty.
Yeager, Valerie A; Bertrand, Jane
2015-10-26
The current limited focus on management in global health activities is highly problematic given the amounts of financial and human resources that are pouring into health system strengthening interventions and the complexity of clinical operations across settings. By ensuring that public health and healthcare practitioners in domestic and international settings receive management training in their educational programs and that we build management capacity among individuals already in the health workforce, we can begin to prepare for more effective health systems strengthening efforts. Rigorous evaluation of health systems strengthening and the impact of management capacity building is crucial to building evidence for the field. © 2016 by Kerman University of Medical Sciences.
Uveitis and Gender: The Course of Uveitis in Pregnancy
Chiam, Nathalie P. Y.; Lim, Lyndell L. P.
2014-01-01
The hormonal and immunological changes in pregnancy have a key role in maintaining maternal tolerance of the semiallogeneic foetus. These pregnancy-associated changes may also influence the course of maternal autoimmune diseases. Noninfectious uveitis tends to improve during pregnancy. Specifically, uveitis activity tends to ameliorate from the second trimester onwards, with the third trimester being associated with the lowest disease activity. The mechanism behind this phenomenon is likely to be multifactorial and complex. Possible mechanisms include Th1/Th2 immunomodulation, regulatory T-cell phenotype plasticity, and immunosuppressive cytokines. This clearly has management implications for patients with chronic sight threatening disease requiring systemic treatment, as most medications are not recommended during pregnancy due to lack of safety data or proven teratogenicity. Given that uveitis activity is expected to decrease in pregnancy, systemic immunosuppressants could be tapered during pregnancy in these patients, with flare-ups being managed with local corticosteroids till delivery. In the postpartum period, as uveitis activity is expected to rebound, patients should be reviewed closely and systemic medications recommenced, depending on uveitis activity and the patient's breastfeeding status. This review highlights the current understanding of the course of uveitis in pregnancy and its management to help guide clinicians in managing their uveitis patients during this special time in life. PMID:24683491
Systems Analysis Directorate Activities Summary August 1977
1977-09-01
are: x a. Cataloging direction b. Requirements computation c. Procurement direction d. Distribution management e. Disposal direction f...34inventory management," as a responsibility of NICP’s, includes cataloging, requirements computation, procurement direction, distribution management , maintenance...functions are cataloging, major item management, secondary item management, procurement direction, distribution management , overhaul and rebuild
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
...] Agency Information Collection Activities; Submission for Office of Management and Budget Review; Comment... Antibacterial Drug Products and Antimicrobial Susceptibility Testing Devices AGENCY: Food and Drug... Systemic Antibacterial Drug Products and Antimicrobial Susceptibility Testing Devices--(OMB Control Number...
41 CFR 105-54.203-2 - Active charters file.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Active charters file... Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services... charters file. The GSA Committee Management Officer retains each original signed charter in a file of...
Implementation of Consolidated HIS: Improving Quality and Efficiency of Healthcare
Choi, Jinwook; Seo, Jeong-Wook; Chung, Chun Kee; Kim, Kyung-Hwan; Kim, Ju Han; Kim, Jong Hyo; Chie, Eui Kyu; Cho, Hyun-Jai; Goo, Jin Mo; Lee, Hyuk-Joon; Wee, Won Ryang; Nam, Sang Mo; Lim, Mi-Sun; Kim, Young-Ah; Yang, Seung Hoon; Jo, Eun Mi; Hwang, Min-A; Kim, Wan Suk; Lee, Eun Hye; Choi, Su Hi
2010-01-01
Objectives Adoption of hospital information systems offers distinctive advantages in healthcare delivery. First, implementation of consolidated hospital information system in Seoul National University Hospital led to significant improvements in quality of healthcare and efficiency of hospital management. Methods The hospital information system in Seoul National University Hospital consists of component applications: clinical information systems, clinical research support systems, administrative information systems, management information systems, education support systems, and referral systems that operate to generate utmost performance when delivering healthcare services. Results Clinical information systems, which consist of such applications as electronic medical records, picture archiving and communication systems, primarily support clinical activities. Clinical research support system provides valuable resources supporting various aspects of clinical activities, ranging from management of clinical laboratory tests to establishing care-giving procedures. Conclusions Seoul National University Hospital strives to move its hospital information system to a whole new level, which enables customized healthcare service and fulfills individual requirements. The current information strategy is being formulated as an initial step of development, promoting the establishment of next-generation hospital information system. PMID:21818449
Title IV Cash Management Life Cycle Training. Participant's Guide.
ERIC Educational Resources Information Center
Department of Education, Washington, DC.
This participant's guide includes: "Introduction: Welcome to Cash Management Life Cycle Training"; "Module 1: Review of Cash Management Principles" (cash management overview and activity); "Module 2: Common Origination and Disbursement (COD) System Overview" (e.g., full participants and phase-in participants, COD…
Monitoring is not enough: on the need for a model-based approach to migratory bird management
Nichols, J.D.; Bonney, Rick; Pashley, David N.; Cooper, Robert; Niles, Larry
2000-01-01
Informed management requires information about system state and about effects of potential management actions on system state. Population monitoring can provide the needed information about system state, as well as information that can be used to investigate effects of management actions. Three methods for investigating effects of management on bird populations are (1) retrospective analysis, (2) formal experimentation and constrained-design studies, and (3) adaptive management. Retrospective analyses provide weak inferences, regardless of the quality of the monitoring data. The active use of monitoring data in experimental or constrained-design studies or in adaptive management is recommended. Under both approaches, learning occurs via the comparison of estimates from the monitoring program with predictions from competing management models.
Use of the data system for field management of a clinical study conducted in Kolkata, India.
Park, Ju Yeon; Kim, Deok Ryun; Haldar, Bisakha; Mallick, Aiyel Haque; Kim, Soon Ae; Dey, Ayan; Nandy, Ranjan Kumar; Paul, Dilip Kumar; Choudhury, Saugata; Sahoo, Shushama; Wierzba, Thomas F; Sur, Dipika; Kanungo, Suman; Ali, Mohammad; Manna, Byomkesh
2016-01-09
Designing an appropriate data system is important to the success of a clinical study. However, little information is available on this topic. We share our experiences on designing, developing, and implementation of a data system for management of data and field activities of a complex clinical study. The data system was implemented aiming at determining the biological basis for the underperformance of oral vaccines, such as polio and rotavirus vaccines in children at a site in Kolkata, India. The system included several functionalities to control data and field activities. It was restricted to authorized users based on their access privileges. A relational database platform was chosen, and Microsoft Visual FoxPro 7.0 (Microsoft Corporation, Seattle, WA, USA) was used to develop the system. The system was installed at the clinic and data office to facilitate both the field and data management activities. Data were doubly entered by two different data operators to identify keypunching errors in the data. Outliers, duplication, inconsistencies, missing entries, and linkage were also checked. Every modification and users log-in/log-out information was auto-recorded in an audit trail. The system offered tools for preparation of visit schedule of the participants. A visit considered as protocol deviation was documented by the system. The system alerted field staff to every upcoming visit date to organize the field activities and to inform participants which day to come. The system also produced a growth chart for evaluating nutritional status and referring the child to a specialized clinic if found to be severely malnourished. The data system offered unique features for controlling for both data and field activities, which led to minimize drop-out rates as well as protocol deviations. Such system is warranted for a successful clinical study.
The development of an airborne information management system for flight test
NASA Technical Reports Server (NTRS)
Bever, Glenn A.
1992-01-01
An airborne information management system is being developed at the NASA Dryden Flight Research Facility. This system will improve the state of the art in management data acquisition on-board research aircraft. The design centers around highly distributable, high-speed microprocessors that allow data compression, digital filtering, and real-time analysis. This paper describes the areas of applicability, approach to developing the system, potential for trouble areas, and reasons for this development activity. System architecture (including the salient points of what makes it unique), design philosophy, and tradeoff issues are also discussed.
Bhat, Nisar A.; Riar, Amritbir; Ramesh, Aketi; Iqbal, Sanjeeda; Sharma, Mahaveer P.; Sharma, Sanjay K.; Bhullar, Gurbir S.
2017-01-01
Mobilization of unavailable phosphorus (P) to plant available P is a prerequisite to sustain crop productivity. Although most of the agricultural soils have sufficient amounts of phosphorus, low availability of native soil P remains a key limiting factor to increasing crop productivity. Solubilization and mineralization of applied and native P to plant available form is mediated through a number of biological and biochemical processes that are strongly influenced by soil carbon/organic matter, besides other biotic and abiotic factors. Soils rich in organic matter are expected to have higher P availability potentially due to higher biological activity. In conventional agricultural systems mineral fertilizers are used to supply P for plant growth, whereas organic systems largely rely on inputs of organic origin. The soils under organic management are supposed to be biologically more active and thus possess a higher capability to mobilize native or applied P. In this study we compared biological activity in soil of a long-term farming systems comparison field trial in vertisols under a subtropical (semi-arid) environment. Soil samples were collected from plots under 7 years of organic and conventional management at five different time points in soybean (Glycine max) -wheat (Triticum aestivum) crop sequence including the crop growth stages of reproductive significance. Upon analysis of various soil biological properties such as dehydrogenase, β-glucosidase, acid and alkaline phosphatase activities, microbial respiration, substrate induced respiration, soil microbial biomass carbon, organically managed soils were found to be biologically more active particularly at R2 stage in soybean and panicle initiation stage in wheat. We also determined the synergies between these biological parameters by using the methodology of principle component analysis. At all sampling points, P availability in organic and conventional systems was comparable. Our findings clearly indicate that owing to higher biological activity, organic systems possess equal capabilities of supplying P for crop growth as are conventional systems with inputs of mineral P fertilizers. PMID:28928758
Concepts of Management Information Systems.
ERIC Educational Resources Information Center
Emery, J.C.
The paper attempts to provide a general framework for dealing with management information systems (MIS). An MIS is defined to have the following characteristics: (1) related to ongoing activities of an organization, (2) a man-machine system, (3) composed of a collection of subsystems, and (4) oriented around a large data base. An MIS places a…
Improving the Utilisation of Management Information Systems in Secondary Schools
ERIC Educational Resources Information Center
Bosker, R. J.; Branderhorst, E. M.; Visscher, A. J.
2007-01-01
Although most secondary schools do use management information systems (MISs), these systems tend not to be used to support higher order managerial activities but are currently primarily used for clerical purposes. This situation is unsatisfactory as MISs fully utilised could offer invaluable support to schools, which are increasingly being granted…
Intelligent Engine Systems: Thermal Management and Advanced Cooling
NASA Technical Reports Server (NTRS)
Bergholz, Robert
2008-01-01
The objective of the Advanced Turbine Cooling and Thermal Management program is to develop intelligent control and distribution methods for turbine cooling, while achieving a reduction in total cooling flow and assuring acceptable turbine component safety and reliability. The program also will develop embedded sensor technologies and cooling system models for real-time engine diagnostics and health management. Both active and passive control strategies will be investigated that include the capability of intelligent modulation of flow quantities, pressures, and temperatures both within the supply system and at the turbine component level. Thermal management system concepts were studied, with a goal of reducing HPT blade cooling air supply temperature. An assessment will be made of the use of this air by the active clearance control system as well. Turbine component cooling designs incorporating advanced, high-effectiveness cooling features, will be evaluated. Turbine cooling flow control concepts will be studied at the cooling system level and the component level. Specific cooling features or sub-elements of an advanced HPT blade cooling design will be downselected for core fabrication and casting demonstrations.
Keeping Track Every Step of the Way
NASA Technical Reports Server (NTRS)
2001-01-01
Knowledge Sharing Systems, Inc., a producer of intellectual assets management software systems for the federal government, universities, non-profit laboratories, and private companies, constructed and presently manages the NASA Technology Tracking System, also known as TechTracS. Under contract to Langley Research Center, TechTracS identifies and captures all NASA technologies, manages the patent prosecution process, and then tracks their progress en route to commercialization. The system supports all steps involved in various technology transfer activities, and is considered the premier intellectual asset management system used in the federal government today. NASA TechTracS consists of multiple relational databases and web servers, located at each of the 10 field centers, as well as NASA Headquarters. The system is capable of supporting the following functions: planning commercial technologies; commercialization activities; reporting new technologies and inventions; and processing and tracking intellectual property rights, licensing, partnerships, awards, and success stories. NASA TechTracS is critical to the Agency's ongoing mission to commercialize its revolutionary technologies in a variety of sectors within private industry, both aerospace and non- aerospace.
Bureau of Land Management Transportation Brochure
DOT National Transportation Integrated Search
2018-02-01
Each fiscal year, Congress appropriates the BLM annual funding for land management, resource management, and many other activities, some of which are used for the BLMs transportation system. The general funding that is used for transportation prov...
Patient population management: taking the leap from variance analysis to outcomes measurement.
Allen, K M
1998-01-01
Case managers today at BCHS have a somewhat different role than at the onset of the Collaborative Practice Model. They are seen throughout the organization as: Leaders/participants on cross-functional teams. Systems change agents. Integrating/merging with quality services and utilization management. Outcomes managers. One of the major cross-functional teams is in the process of designing a Care Coordinator role. These individuals will, as one of their functions, assume responsibility for daily patient care management activities. A variance tracking program has come into the Utilization Management (UM) department as part of a software package purchased to automate UM work activities. This variance program could potentially be used by the new care coordinators as the role develops. The case managers are beginning to use a Decision Support software, (Transition Systems Inc.) in the collection of data that is based on a cost accounting system and linked to clinical events. Other clinical outcomes data bases are now being used by the case manager to help with the collection and measurement of outcomes information. Hoshin planning will continue to be a framework for defining and setting the targets for clinical and financial improvements throughout the organization. Case managers will continue to be involved in many of these system-wide initiatives. In the words of Galileo, 1579, "You need to count what's countable, measure what's measurable, and what's not measurable, make measurable."
A need for the standardization of the pharmaceutical sector in Libya
Mustafa, Asma Abubakr; Kowalski, Stefan Robert
2010-01-01
Medicines are health technologies that can translate into tangible benefits for numerous acute as well as chronic health conditions. A nation's pharmaceutical sector needs to be appropriately structured and managed in order to ensure a safe, effective and quality supply of medicines to society. The process of medicines management involves the sequential management of five critical activity areas; namely; registration, selection, procurement, distribution and use. Formalized and standardized management of all five critical activity areas positively influences the availability, quality and affordability of medicines and ultimately increases the reliability and quality of the national healthcare system. Aim The aim of this review is to examine the current structure and operation of medicines management (i.e. the pharmaceutical sector) in Libya. Conclusion In the Libyan healthcare system all five critical activity areas are compromised. Restructuring of the pharmaceutical sector in Libya is required in order to provide and sustain sound pharmaceutical services for Libyan society and improve the national public health outcomes. PMID:21483563
Organizational Entrepreneurship and Administrators of Hospitals: Case Study of Iran
Raadabadi, Mehdi; Fayaz-Bakhsh, Ahmad; Nazari, Aslan; Mousavi, Seyed Masood; Fayaz-Bakhsh, MohammadAli
2014-01-01
Due to rapid changes of technology and scientific advances in health systems and need for fast planning in health care, entrepreneurial spirit among employers and employees is a crucial element. According to the field of entrepreneurship research has not been solved and where learning and innovation for healthcare organizations due to the nature of the work required. This study aims to examine the entrepreneurial activities within the hospitals affiliated to Tehran University of Medical Sciences, Iran. To achieve the aim of the study, a questionnaire containing 29 items regarding the areas of innovation, creative behavior, flexibility, empowerment, rewarding systems and the management support was distributed among the hospitals’ managers. Establishment of a culture of entrepreneurship in healthcare organizations led to the development unit controlled, changing the culture of the hospital. The analysis of the data showed that the majority of the managers agreed with all five areas of entrepreneurship namely the existence of innovation and innovative behavior, flexibility, decision making, rewarding and encouraging system, as well as management supportive system of personnel’s new ideas. In fact, the managers generally had positive attitude towards entrepreneurship in their organizations The Pearson correlation test also showed that there is a significant relationship between the areas of entrepreneurship and the managers’ age as well as their working experience (P<0.05). Entrepreneurial activities in healthcare can be improved through providing a suitable environment, adjusting reward and encouragement systems, giving more authority to subordinates, promoting awareness and education, and mobilizing managers to attract appropriate opportunities for organization. Further active involvement of employees, more stable in front of changes and increased ability managers to capture opportunities in domestic and foreign situation. PMID:24762370
Lancioni, Giulio E; Singh, Nirbhay N; O'Reilly, Mark F; Green, Vanessa A; Oliva, Doretta; Campodonico, Francesca
2013-10-01
To assess whether two persons with multiple disabilities could learn a work activity (i.e., assembling trolley wheels) with the support of a technology system. After an initial baseline, the study compared the effects of intervention sessions relying on the technology system (which called the participants to the different workstations and provided feedback and final stimulation) with the effects of intervention sessions carried out without technology. The two types of intervention sessions were conducted according to an alternating treatments design. Eventually, only intervention sessions relying on the technology system were used. Both participants managed to assemble wheels independently during intervention sessions relying on the technology system while they failed during sessions without the system. Their performance was strengthened during the final part of the study, in which only sessions with the system occurred. Technology may be critical in helping persons with multiple disabilities manage multi-step work activities.
15 CFR 287.4 - Responsibilities of Federal agencies.
Code of Federal Regulations, 2014 CFR
2014-01-01
... requirements and measures. An example of this would be to collect and review information on similar activities..., quality and environmental management systems, management system registration and accreditation are issued... Cooperation and Development (OECD), the World Health Organization (WHO), and the Codex Alimentarius Commission...
15 CFR 287.4 - Responsibilities of Federal agencies.
Code of Federal Regulations, 2012 CFR
2012-01-01
... requirements and measures. An example of this would be to collect and review information on similar activities..., quality and environmental management systems, management system registration and accreditation are issued... Cooperation and Development (OECD), the World Health Organization (WHO), and the Codex Alimentarius Commission...
15 CFR 287.4 - Responsibilities of Federal agencies.
Code of Federal Regulations, 2013 CFR
2013-01-01
... requirements and measures. An example of this would be to collect and review information on similar activities..., quality and environmental management systems, management system registration and accreditation are issued... Cooperation and Development (OECD), the World Health Organization (WHO), and the Codex Alimentarius Commission...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
[Blood transfusion audit methodology: the auditors, reference systems and audit guidelines].
Chevrolle, F; Hadzlik, E; Arnold, J; Hergon, E
2000-12-01
The audit has become an essential aspect of the blood transfusion sector, and is a management tool that should be used judiciously. The main types of audit that can be envisaged in blood transfusion are the following: operational audit concerning a predetermined activity; systems quality audit; competence audit, combining the operational audit on a specific activity with quality management, e.g., laboratory accreditation; audit of the environmental management system; and social audit involving the organization of an activity and the management of human resources. However, the main type of audit considered in this article is the conformity audit, which in this context does not refer to internal control but to conformity with an internal guideline issued by the French National Blood Service. All audits are carried out on the basis of a predescribed method (contained in ISO 10 011). The audit is a system of investigation, evaluation and measurement, and also a means of continuous assessment and therefore improvement. The audit is based on set guidelines, but in fact consists of determining the difference between the directions given and what has actually been done. Auditing requires operational rigor and integrity, and has now become a profession in its own right.
ERIC Educational Resources Information Center
Riegel, N. Blyth
Recent changes in the structure of curriculum and the instructional system in Texas have required a major reorganization of teaching, evaluating, budgeting, and planning activities in the local education agencies, which has created the need for a database. The history of Richardson Instructional Management System (RIMS), its data processing…
2014-12-02
NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Participating are Mike Bolger, Ground Systems Development and Operations program manager Mark Geyer, Orion program manager and Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Monitoring the live discussion is Brandi Dean, public affairs specialist from Johnson Space Center in Houston.
2014-12-02
CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager. Also participating, but not shown in the photo is Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin
2014-12-02
CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager. Across from them, in the plaid shirt is Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin
Quality indicators for Transfusion Medicine in Spain: a survey among hospital transfusion services.
Romon, Iñigo; Lozano, Miguel
2017-05-01
Transfusion services in the European Union must implement quality management systems to improve quality. Quality indicators (QI) play a key role in quality management because they can supply important information about the performance of the transfusion service, which can then be used for benchmarking. However, little is known about the actual use of QI in hospitals. We tried to ascertain the use and characteristics of QI in Spanish hospital transfusion services. We performed a survey among transfusion services in order to learn which QI they use. We classified indicators into categories and concepts, according to the steps of the transfusion process or the activities the indicators referred to. Seventy-six hospitals (17.9% of the hospitals actively transfusing in the country) reported 731 QI. Twenty-two of them (29%) were tertiary level hospitals. The number of indicators per hospital and by activity varied greatly. QI were assigned to some basic categories: transfusion process (23% of indicators), transfusion activity and stock management (22%), haemovigilance (20%), stem cell transplantation (9%), transfusion laboratory (9%), quality management system (8%), blood donation (3.4%), apheresis and therapeutic activities (2.5%) and immunohaematology of pregnancy (2%). Although most hospitals use QI in their quality management system and share a core group of indicators, we found a great dispersion in the number and characteristics of the indicators used. The use of a commonly agreed set of QI could be an aid to benchmarking among hospitals and to improving the transfusion process.
A reduced energy supply strategy in active vibration control
NASA Astrophysics Data System (ADS)
Ichchou, M. N.; Loukil, T.; Bareille, O.; Chamberland, G.; Qiu, J.
2011-12-01
In this paper, a control strategy is presented and numerically tested. This strategy aims to achieve the potential performance of fully active systems with a reduced energy supply. These energy needs are expected to be comparable to the power demands of semi-active systems, while system performance is intended to be comparable to that of a fully active configuration. The underlying strategy is called 'global semi-active control'. This control approach results from an energy investigation based on management of the optimal control process. Energy management encompasses storage and convenient restitution. The proposed strategy monitors a given active law without any external energy supply by considering purely dissipative and energy-demanding phases. Such a control law is offered here along with an analysis of its properties. A suboptimal form, well adapted for practical implementation steps, is also given. Moreover, a number of numerical experiments are proposed in order to validate test findings.
Matthew Thompson; David Calkin; Joe H. Scott; Michael Hand
2017-01-01
Wildfire risk assessment is increasingly being adopted to support federal wildfire management decisions in the United States. Existing decision support systems, specifically the Wildland Fire Decision Support System (WFDSS), provide a rich set of probabilistic and riskâbased information to support the management of active wildfire incidents. WFDSS offers a wide range...
NASA Technical Reports Server (NTRS)
Ashworth, Barry R.
1989-01-01
A description is given of the SSM/PMAD power system automation testbed, which was developed using a systems engineering approach. The architecture includes a knowledge-based system and has been successfully used in power system management and fault diagnosis. Architectural issues which effect overall system activities and performance are examined. The knowledge-based system is discussed along with its associated automation implications, and interfaces throughout the system are presented.
wide range of human activity . Activities relating to management are the concern of a trial system at Project MAC called OPS-1. The OPS-1 system and the experiment that launched it are described in the manual. (Author)
Carbon Management In the Post-Cap-and-Trade Carbon Economy-Part II
NASA Astrophysics Data System (ADS)
DeGroff, F. A.
2014-12-01
This is the second installment in our search for a comprehensive economic model to mitigate climate change due to anthropogenic activity. Last year we presented how the unique features of our economic model measure changes in carbon flux due to anthropogenic activity, referred to as carbon quality or CQ, and how the model is used to value such changes in the climate system. This year, our paper focuses on how carbon quality can be implemented to capture the effect of economic activity and international trade on the climate system, thus allowing us to calculate a Return on Climate System (RoCS) for all economic assets and activity. The result is that the RoCS for each public and private economic activity and entity can be calculated by summing up the RoCS for each individual economic asset and activity in which an entity is engaged. Such a macro-level scale is used to rank public and private entities including corporations, governments, and even entire nations, as well as human adaptation and carbon storage activities, providing status and trending insights to evaluate policies on both a micro- and macro-economic level. With international trade, RoCS measures the embodied effects on climate change that will be needed to assess border fees to insure carbon parity on all imports and exports. At the core of our vision is a comprehensive, 'open-source' construct of which our carbon quality metric is the first element. One goal is to recognize each country's endemic resources and infrastructure that affect their ability to manage carbon, while preventing spatial and temporal shifting of carbon emissions that reduce or reverse efforts to mitigate climate change. The standards for calculating the RoCS can be promulgated as part of the Generally Accepted Accounted Principles (GAAP) and the International Financial Reporting Standards (IFRS) to ensure standard and consistent reporting. The value of such insights on the climate system at all levels will be crucial to managing anthropogenic activity in order to minimize the effect on the climate system. Without the insights provided by a comprehensive, standardized and verifiable RoCS, managing anthropogenic activity will be elusive and difficult to achieve, at best. Such a model may also be useful to manage the effect of anthropogenic activity on the nitrogen and phosphorous cycles.
Environment, Health, and Safety | NREL
property, and the environment. View the Environmental Stewardship, Health, Safety, and Quality Management (OHSAS) 18001 certification demonstrates NREL's commitment to a health and safety management system that into all activities. NREL's staff and management are committed to managing health and safety risk
NASA Technical Reports Server (NTRS)
Nielson, G. J.; Stevenson, W. G.
1976-01-01
Operations research activities developed to identify the information required to manage both the efficiency and effectiveness of the Veterans Administration (VA) health services as these services relate to individual patient care are reported. The clinical concerns and management functions that determine this information requirement are discussed conceptually. Investigations of existing VA data for useful management information are recorded, and a diagnostic index is provided. The age-specific characteristics of diseases and lengths of stay are explored, and recommendations for future analysis activities are articulated. The effect of the introduction of new technology to health care is also discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grundt, H.J.
1996-12-31
This paper discusses the use of information on accidents and near-misses to improve HSE performance and reduce losses in Exploration and Production activities. Incidents are considered a result of management system failure. To avoid incidents and recurrence of incidents, companies should adopt an integrated HSE Management System and software especially designed for recording, analyzing and following up events. The E&P Forum has issued guidelines to support current company HSE Management systems and practices. Concurrently, the Synergi Project has been established to facilitate experience transfer and effective handling of incidents as part of an integrated HSE Management System. The paper describesmore » how important it is to learn from past mistakes, to have a management system which facilitates the implementation of the required corrective action, and that tools for improved loss control are available.« less
Status of native fishes in the western United States and issues for fire and fuels management
Rieman, B.; Lee, D.; Burns, D.; Gresswell, Robert E.; Young, M.; Stowell, R.; Rinne, J.; Howell, P.
2003-01-01
Conservation of native fishes and changing patterns in wildfire and fuels are defining challenges for managers of forested landscapes in the western United States. Many species and populations of native fishes have declined in recorded history and some now occur as isolated remnants of what once were larger more complex systems. Land management activities have been viewed as one cause of this problem. Fires also can have substantial effects on streams and riparian systems and may threaten the persistence of some populations of fish, particularly those that are small and isolated. Despite that, major new efforts to actively manage fires and fuels in forests throughout the region may be perceived as a threat rather than a benefit to conservation of native fishes and their habitats. The management of terrestrial and aquatic resources has often been contentious, divided among a variety of agencies with different goals and mandates. Management of forests, for example, has generally been viewed as an impact on aquatic systems. Implementation of the management-regulatory process has reinforced a uniform approach to mitigate the threats to aquatic species and habitats that may be influenced by management activities. The problems and opportunities, however, are not the same across the landscapes of interest. Attempts to streamline the regulatory process often search for generalized solutions that may oversimplify the complexity of natural systems. Significant questions regarding the influence of fire on aquatic ecosystems, changing fire regimes, and the effects of fire-related management remain unresolved and contribute to the uncertainty. We argue that management of forests and fishes can be viewed as part of the same problem, that of conservation and restoration of the natural processes that create diverse and productive ecosystems. We suggest that progress toward more integrated management of forests and native fishes will require at least three steps: (1) better integration and development of a common conceptual foundation and ecological goals; (2) attention to landscape and ecological context; and (3) recognition of uncertainty.
A Two-Stage Probabilistic Approach to Manage Personal Worklist in Workflow Management Systems
NASA Astrophysics Data System (ADS)
Han, Rui; Liu, Yingbo; Wen, Lijie; Wang, Jianmin
The application of workflow scheduling in managing individual actor's personal worklist is one area that can bring great improvement to business process. However, current deterministic work cannot adapt to the dynamics and uncertainties in the management of personal worklist. For such an issue, this paper proposes a two-stage probabilistic approach which aims at assisting actors to flexibly manage their personal worklists. To be specific, the approach analyzes every activity instance's continuous probability of satisfying deadline at the first stage. Based on this stochastic analysis result, at the second stage, an innovative scheduling strategy is proposed to minimize the overall deadline violation cost for an actor's personal worklist. Simultaneously, the strategy recommends the actor a feasible worklist of activity instances which meet the required bottom line of successful execution. The effectiveness of our approach is evaluated in a real-world workflow management system and with large scale simulation experiments.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Manager of the Thermal Protection System (TPS) Facility Martin Wilson (right) briefs NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) on the properties of a thermal blanket used in the Shuttle's TPS. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Reeder, Blaine; Turner, Anne M
2011-01-01
Responding to public health emergencies requires rapid and accurate assessment of workforce availability under adverse and changing circumstances. However, public health information systems to support resource management during both routine and emergency operations are currently lacking. We applied scenario-based design as an approach to engage public health practitioners in the creation and validation of an information design to support routine and emergency public health activities. Methods: Using semi-structured interviews we identified the information needs and activities of senior public health managers of a large municipal health department during routine and emergency operations. Results: Interview analysis identified twenty-five information needs for public health operations management. The identified information needs were used in conjunction with scenario-based design to create twenty-five scenarios of use and a public health manager persona. Scenarios of use and persona were validated and modified based on follow-up surveys with study participants. Scenarios were used to test and gain feedback on a pilot information system. Conclusion: The method of scenario-based design was applied to represent the resource management needs of senior-level public health managers under routine and disaster settings. Scenario-based design can be a useful tool for engaging public health practitioners in the design process and to validate an information system design. PMID:21807120
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
30 CFR 285.810 - What must I include in my Safety Management System?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Activities Conducted Under SAPs, COPs and GAPs Safety Management Systems § 285.810 What must I include in my... your COP (provided under § 285.627(d)) and, when required by this part, your SAP (as provided in § 285...
48 CFR 945.102-71 - Maintenance of records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MANAGEMENT GOVERNMENT PROPERTY General 945.102-71 Maintenance of records. The contracting activity shall maintain records of approvals and reviews of contractors' property management systems, the dollar value of... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Maintenance of records...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
A model for ubiquitous care of noncommunicable diseases.
Vianna, Henrique Damasceno; Barbosa, Jorge Luis Victória
2014-09-01
The ubiquitous computing, or ubicomp, is a promising technology to help chronic diseases patients managing activities, offering support to them anytime, anywhere. Hence, ubicomp can aid community and health organizations to continuously communicate with patients and to offer useful resources for their self-management activities. Communication is prioritized in works of ubiquitous health for noncommunicable diseases care, but the management of resources is not commonly employed. We propose the UDuctor, a model for ubiquitous care of noncommunicable diseases. UDuctor focuses the resources offering, without losing self-management and communication supports. We implemented a system and applied it in two practical experiments. First, ten chronic patients tried the system and filled out a questionnaire based on the technology acceptance model. After this initial evaluation, an alpha test was done. The system was used daily for one month and a half by a chronic patient. The results were encouraging and show potential for implementing UDuctor in real-life situations.
Caroly, S; Coutarel, F; Landry, A; Mary-Cheray, I
2010-07-01
To increase output and meet customers' needs, companies have turned to the development of production management systems: Kaizen, one piece flow, Kanban, etc. The aim of such systems is to accelerate decisions, react to environmental issues and manage various productions. In the main, this type of management system has led to the continuous improvement of production performance. Consequently, such production management systems can have unexpected negative effects on operators' health and safety. Conversely, regulation and control systems focusing on work-related risks have obliged firms to implement health and safety management systems such as OHSAS 18001. The purpose of this type of system, also based on continuous improvement, is to reduce risks, facilitate work-related activities and identify solutions in terms of equipment and tools. However, the prevention actions introduced through health and safety systems often result in other unexpected and unwanted effects on production. This paper shows how companies can improve the way they are run by taking into account both types of management system. Copyright 2010 Elsevier Ltd. All rights reserved.
Wax, David B; Lin, Hung-Mo; Reich, David L
2012-12-01
Anesthesia information management system workstations in the anesthesia workspace that allow usage of non-record-keeping applications could lead to distraction from patient care. We evaluated whether non-record-keeping usage of the computer workstation was associated with hemodynamic variability and aberrancies. Auditing data were collected on eight anesthesia information management system workstations and linked to their corresponding electronic anesthesia records to identify which application was active at any given time during the case. For each case, the periods spent using the anesthesia information management system record-keeping module were separated from those spent using non-record-keeping applications. The variability of heart rate and blood pressure were also calculated, as were the incidence of hypotension, hypertension, and tachycardia. Analysis was performed to identify whether non-record-keeping activity was a significant predictor of these hemodynamic outcomes. Data were analyzed for 1,061 cases performed by 171 clinicians. Median (interquartile range) non-record-keeping activity time was 14 (1, 38) min, representing 16 (3, 33)% of a median 80 (39, 143) min of procedure time. Variables associated with greater non-record-keeping activity included attending anesthesiologists working unassisted, longer case duration, lower American Society of Anesthesiologists status, and general anesthesia. Overall, there was no independent association between non-record-keeping workstation use and hemodynamic variability or aberrancies during anesthesia either between cases or within cases. Anesthesia providers spent sizable portions of case time performing non-record-keeping applications on anesthesia information management system workstations. This use, however, was not independently associated with greater hemodynamic variability or aberrancies in patients during maintenance of general anesthesia for predominantly general surgical and gynecologic procedures.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
... DEPARTMENT OF EDUCATION [Docket No. ED-2012-ICCD-0045] Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Comment Request; Impact Evaluation of Teacher and Leader Evaluation Systems AGENCY: Department of Education (ED), Institute of Education...
Update on the Activities of The NELAC Institute (TNI)
2012-03-28
IEC 17025 :2005 How to Manage an Effective Quality Management System TNI Cooperative Agreements with EPA Former (2006 – 2010) $400,000 for...Correct Use of Standard Methods Accreditation Demonstrates Competency for Field Activities Getting Ready for NEFAP A Practical Foundation in ISO
7 CFR 1484.33 - Must Cooperators follow certain financial management guidelines?
Code of Federal Regulations, 2010 CFR
2010-01-01
... management system that conforms to generally accepted accounting principles. (b) A Cooperator shall institute... documents relating to program activities for 5 calendar years following the end of the applicable marketing... that allows it to provide information by marketing plan year, country or region, activity number, and...
41 CFR 101-28.306-1 - Establishment of a CSC account by a customer activity.
Code of Federal Regulations, 2013 CFR
2013-07-01
... account by a customer activity. (a) Eligible agencies should contact the GSA Regional Federal Supply... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... will provide assistance to agencies in the establishment of the CSC account, brief personnel on the use...
41 CFR 101-28.306-1 - Establishment of a CSC account by a customer activity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... account by a customer activity. (a) Eligible agencies should contact the GSA Regional Federal Supply... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... will provide assistance to agencies in the establishment of the CSC account, brief personnel on the use...
41 CFR 101-28.306-1 - Establishment of a CSC account by a customer activity.
Code of Federal Regulations, 2012 CFR
2012-07-01
... account by a customer activity. (a) Eligible agencies should contact the GSA Regional Federal Supply... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... will provide assistance to agencies in the establishment of the CSC account, brief personnel on the use...
41 CFR 101-28.306-1 - Establishment of a CSC account by a customer activity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... account by a customer activity. (a) Eligible agencies should contact the GSA Regional Federal Supply... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... will provide assistance to agencies in the establishment of the CSC account, brief personnel on the use...
41 CFR 101-28.306-1 - Establishment of a CSC account by a customer activity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... account by a customer activity. (a) Eligible agencies should contact the GSA Regional Federal Supply... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... will provide assistance to agencies in the establishment of the CSC account, brief personnel on the use...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... Department of Homeland Security, Federal Emergency Management Agency, and sent via electronic mail to oira... Program's (NFIP) Community Rating System (CRS) to document the activities that communities have undertaken... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID: FEMA-2010-0012...
Lighting system with heat distribution face plate
Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Li, Ri
2013-09-10
Lighting systems having a light source and a thermal management system are provided. The thermal management system includes synthetic jet devices, a heat sink and a heat distribution face plate. The synthetic jet devices are arranged in parallel to one and other and are configured to actively cool the lighting system. The heat distribution face plate is configured to radially transfer heat from the light source into the ambient air.
Grant, Simon; Wheatley, R J
2014-12-01
To create and implement a system through which pre-hospital healthcare activity across an entire operational theatre could be made available in real-time to support healthcare delivery, governance and assurance activity. An IT-based system was created that could display, manage and integrate the pre-hospital healthcare activity on Op HERRICK 18. The system was based on the Defence Medical Services Common Assurance Framework and run through Microsoft Office SharePoint. Pre-hospital healthcare activity was made available and visible across an operational theatre. This supported delivery, assurance and governance at any time. Activity from each medical facility could be integrated and display automatically improving theatre wide situational awareness. The availability of information resulted in a shift towards a more continuous process of assurance and governance rather than reliance on inherently threatening and increasingly intermittent inspection regimes. The ability to review healthcare activity remotely at anytime significantly improves the validity of assurance possible for a deployed force. Governance activity can be more responsive and less reliant on the fixed timescale and datasets of reports from outlying medical facilities. However, assurance and governance authorities must not allow such a wealth of information to impact local leadership and innovation through a perception of, or actual, micro-management. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Remote access to medical specialists: home care interactive patient management system
NASA Astrophysics Data System (ADS)
Martin, Peter J.; Draghic, Nicole; Wiesmann, William P.
1999-07-01
Diabetes management involves constant care and rigorous compliance. Glucose control is often difficult to maintain and onset of complications further compound health care needs. Status can be further hampered by geographic isolation from immediate medical infrastructures. The Home Care Interactive Patient Management System is an experimental telemedicine program that could improve chronic illness management through Internet-based applications. The goal of the system is to provide a customized, integrated approach to diabetes management to supplement and coordinate physician protocol while supporting routine patient activity, by supplying a set of customized automated services including health data collection, transmission, analysis and decision support.
[Research of regional medical consumables reagent logistics system in the modern hospital].
Wu, Jingjiong; Zhang, Yanwen; Luo, Xiaochen; Zhang, Qing; Zhu, Jianxin
2013-09-01
To explore the modern hospital and regional medical consumable reagents logistics system management. The characteristics of regional logistics, through cooperation between medical institutions within the region, and organize a wide range of special logistics activities, to make reasonable of the regional medical consumable reagents logistics. To set the regional management system, dynamic management systems, supply chain information management system, after-sales service system and assessment system. By the research of existing medical market and medical resources, to establish the regional medical supplies reagents directory and the initial data. The emphasis is centralized dispatch of medical supplies reagents, to introduce qualified logistics company for dispatching, to improve the modern hospital management efficiency, to costs down. Regional medical center and regional community health service centers constitute a regional logistics network, the introduction of medical consumable reagents logistics services, fully embodies integrity level, relevance, purpose, environmental adaptability of characteristics by the medical consumable reagents regional logistics distribution. Modern logistics distribution systems can increase the area of medical consumables reagent management efficiency and reduce costs.
Configuration Management Process Assessment Strategy
NASA Technical Reports Server (NTRS)
Henry, Thad
2014-01-01
Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*
76 FR 58003 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-19
... FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request AGENCY: Board of Governors of the Federal Reserve System. SUMMARY: On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its...
77 FR 52031 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request AGENCY: Board of Governors of the Federal Reserve System. SUMMARY: On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its...
75 FR 4819 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request AGENCY: Board of Governors of the Federal Reserve System. SUMMARY: Background. On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its...
78 FR 38033 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request AGENCY: Board of Governors of the Federal Reserve System. SUMMARY: On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its...
77 FR 72349 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-05
... FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request AGENCY: Board of Governors of the Federal Reserve System. SUMMARY: On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its...
75 FR 53966 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-02
... FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request AGENCY: Board of Governors of the Federal Reserve System. SUMMARY: Background. On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its...
Spatial organization of agricultural landscape, farming activities and hydrological risk assessment
NASA Astrophysics Data System (ADS)
Viaud, V.; Merot, P.
2003-04-01
Agriculture intensification is considered as a major cause of water pollution since it has gone both with an increasing use of fertilisers and significant changes in land-use patterns. Among the prescriptions for pollution control, the management of buffer zones at the landscape scale is supported by the environmental policies, but often without consideration of the systems of human activities they are aimed at. Agricultural landscapes, with fields potentially source of pollution and buffer zones, are spatially organized and managed by farming activities. In a perspective of sustainable management, an integrating approach of environmental issues and farming activities is thus required. This approach was applied to bocage landscapes (landscapes with cultivated fields surrounded by hedgerow systems) in Brittany (Western France). Bocage landscapes are frequently encountered, especially in Europe, and many studies put forward their hydrological and hydrochemical buffer functions. Those results provide informations on the link between spatial organization of hedgerow systems and their environmental effectiveness. They enable to design models of functional bocage landscapes. The objective of this work was to pick out, among those theoretical models, the models compatible with the farming activities. The results will be presented and the additional constraints for the farming systems created by a functional landscape, from a hydrological and hydrochemical perspective, will be discussed.
The Logistics Equipment Carbon Emission Monitoring System for a Green Logistics
NASA Astrophysics Data System (ADS)
Choi, Hyungrim; Park, Byoungkwon; Lee, Byungha; Park, Yongsung; Lee, Changsup; Ha, Jeongsoo
Recently, due to the global enforcement of obligations to reduce green house gases and various environmental regulations, low carbon green growth strategies are required. Currently, in our country, environment friendly logistics activities are staying in the early stage compared to advanced countries because of our country's large energy consumption type industrial structures. As a measure to respond to the trend of the reinforcement of international environmental regulations in the sector of logistics, active green logistics systems should be established and to solve this problem, this study is intended to develop a monitoring system that can manage the carbon emission of logistics equipment(container truck, discharging equipment etc) in real time using a new technology named IP-RFID. The monitoring system developed in this study can actively manage the carbon emission of individual logistics equipment by attaching IP-Tags that can measure the carbon emission of individual logistics equipment in real time and transmit the information obtained from the measurement directly to users through IP communication. Since carbon emission can be managed by logistics equipment and drivers can check the carbon emission of equipment through this system, the carbon emission generated in the logistics sector may be reduced by using this system.
A distributed cloud-based cyberinfrastructure framework for integrated bridge monitoring
NASA Astrophysics Data System (ADS)
Jeong, Seongwoon; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.
2017-04-01
This paper describes a cloud-based cyberinfrastructure framework for the management of the diverse data involved in bridge monitoring. Bridge monitoring involves various hardware systems, software tools and laborious activities that include, for examples, a structural health monitoring (SHM), sensor network, engineering analysis programs and visual inspection. Very often, these monitoring systems, tools and activities are not coordinated, and the collected information are not shared. A well-designed integrated data management framework can support the effective use of the data and, thereby, enhance bridge management and maintenance operations. The cloud-based cyberinfrastructure framework presented herein is designed to manage not only sensor measurement data acquired from the SHM system, but also other relevant information, such as bridge engineering model and traffic videos, in an integrated manner. For the scalability and flexibility, cloud computing services and distributed database systems are employed. The information stored can be accessed through standard web interfaces. For demonstration, the cyberinfrastructure system is implemented for the monitoring of the bridges located along the I-275 Corridor in the state of Michigan.
Enhancing communication by using the Coordinated Care Classification System.
O'Neal, P V; Kozeny, D K; Garland, P P; Gaunt, S M; Gordon, S C
1998-07-01
Because of the changes in our healthcare system, some clinical nurse specialists (CNSs) are having to expand their traditional roles of clinician, educator, consultant, leader, and researcher to include case management activities. The CNSs at Promina Gwinnett Health System in Lawrenceville, Georgia, have combined CNS and case manager activities and have adopted the title "CNS/Outcomes Coordinator." The CNS/Outcomes Coordinator is responsible for coordinating patient care, promoting team collaboration, and facilitating communication. To inform the healthcare team of the CNS/Outcomes Coordinator's patient responsibilities, the CNS/Outcomes Coordinators developed a Coordinated Care Classification System. This article describes how coordinating patient care, promoting team collaboration, and facilitating communication can be enhanced by the use of a classification system.
Bazuin, Doug; Martinez, Jessica; Harper, Kathy; Okland, Kathy; Bergquist, Patricia; Kumar, Shilpi
2015-01-01
The purpose of this study was to gain insight into the use and storage of supplies in the neonatal intensive care and women's health units of Parkland Hospital in Dallas, Texas. Construction of a new Parkland Hospital is underway, with completion of the 862-bed, 2.5-million square feet hospital in 2014. Leaders from the hospital and representatives from one of its major vendors collaborated on a research study to evaluate the hospital's current supply management system and develop criteria to create an improved system to be implemented at the new hospital. Approach includes qualitative and quantitative methods, that is, written survey, researcher observations, focus groups, and evaluation of hospital supply reports. Approaching the ideal location of supplies can be best approached by defining a nurse's activity at the point of care. Determining an optimal supply management system must be approached by understanding the "what" of caregivers' activities and then determining the "where" of the supplies that support those activities. An ideal supply management system locates supplies as close as possible to the point of use, is organized by activity, and is standardized within and across units. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
Vasiliades, Lampros; Sidiropoulos, Pantelis; Tzabiras, John; Kokkinos, Konstantinos; Spiliotopoulos, Marios; Papaioannou, George; Fafoutis, Chrysostomos; Michailidou, Kalliopi; Tziatzios, George; Loukas, Athanasios; Mylopoulos, Nikitas
2015-04-01
Natural and engineered water systems interact throughout watersheds and while there is clearly a link between watershed activities and the quantity and quality of water entering the engineered environment, these systems are considered distinct operational systems. As a result, the strategic approach to data management and modeling within the two systems is very different, leading to significant difficulties in integrating the two systems in order to make comprehensive watershed decisions. In this paper, we describe the "HYDROMENTOR" research project, a highly-structured data storage and exchange system that integrates multiple tools and models describing both natural and modified environments, to provide an integrated tool for management of water resources. Our underlying objective in presenting our conceptual design for this water information system is to develop an integrated and automated system that will achieve monitoring and management of the water quantity and quality at watershed level for both surface water (rivers and lakes) and ground water resources (aquifers). The uniqueness of the system is the integrated treatment of the water resources management issue in terms of water quantity and quality in current climate conditions and in future conditions of climatic change. On an operational level, the system provides automated warnings when the availability, use and pollution levels exceed allowable limits pre-set by the management authorities. Decision making with respect to the apportionment of water use by surface and ground water resources are aided through this system, while the relationship between the polluting activity of a source to total incoming pollution by sources are determined; this way, the best management practices for dealing with a crisis are proposed. The computational system allows the development and application of actions, interventions and policies (alternative management scenarios) so that the impacts of climate change in quantity, quality and use of water resources could be evaluated and managed. Acknowledgements: This study has been supported by the research project "Hydromentor" funded by the Greek General Secretariat of Research and Technology in the framework of the E.U. co-funded National Action "Cooperation".
12 CFR 225.26 - Factors considered in acting on nonbanking proposals.
Code of Federal Regulations, 2010 CFR
2010-01-01
... acquired, the effect of the proposed transaction on those resources, and the management expertise, internal control and risk-management systems, and capital of the entity conducting the activity. (c) Competitive... THE FEDERAL RESERVE SYSTEM BANK HOLDING COMPANIES AND CHANGE IN BANK CONTROL (REGULATION Y...
The Management of Instruction.
ERIC Educational Resources Information Center
Tosti, Donald T.; Harmon, N. Paul
A new conceptual approach to the analysis of educational systems is defined. It centers attention on the instructional management decision making process, which serves to mediate the activities of the students and learning environment, so that much of the present confusion surrounding the design of educational systems is eliminated. Instructional…
Code of Federal Regulations, 2012 CFR
2012-04-01
... affect financial resources, participant and product eligibility, risk management (including matters relating to margin and stress testing), daily or intraday settlement procedures, default procedures, system... settlement activities and the sufficiency of any proposed risk management techniques. (d) Notice of objection...
Code of Federal Regulations, 2013 CFR
2013-04-01
... affect financial resources, participant and product eligibility, risk management (including matters relating to margin and stress testing), daily or intraday settlement procedures, default procedures, system... settlement activities and the sufficiency of any proposed risk management techniques. (d) Notice of objection...
Code of Federal Regulations, 2014 CFR
2014-04-01
... affect financial resources, participant and product eligibility, risk management (including matters relating to margin and stress testing), daily or intraday settlement procedures, default procedures, system... settlement activities and the sufficiency of any proposed risk management techniques. (d) Notice of objection...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... Aviation Administration to measure management objectives and analyze customer feedback for ISO-9001. DATES... Aviation System Standards Distribution Dissemination Quality Plan states that the organization shall... Quality Management System in relation to customer satisfaction. The Glenn Dale Distribution Center...
Russom, Diana; Ahmed, Amira; Gonzalez, Nancy; Alvarnas, Joseph; DiGiusto, David
2012-01-01
Regulatory requirements for the manufacturing of cell products for clinical investigation require a significant level of record-keeping, starting early in process development and continuing through to the execution and requisite follow-up of patients on clinical trials. Central to record-keeping is the management of documentation related to patients, raw materials, processes, assays and facilities. To support these requirements, we evaluated several laboratory information management systems (LIMS), including their cost, flexibility, regulatory compliance, ongoing programming requirements and ability to integrate with laboratory equipment. After selecting a system, we performed a pilot study to develop a user-configurable LIMS for our laboratory in support of our pre-clinical and clinical cell-production activities. We report here on the design and utilization of this system to manage accrual with a healthy blood-donor protocol, as well as manufacturing operations for the production of a master cell bank and several patient-specific stem cell products. The system was used successfully to manage blood donor eligibility, recruiting, appointments, billing and serology, and to provide annual accrual reports. Quality management reporting features of the system were used to capture, report and investigate process and equipment deviations that occurred during the production of a master cell bank and patient products. Overall the system has served to support the compliance requirements of process development and phase I/II clinical trial activities for our laboratory and can be easily modified to meet the needs of similar laboratories.
Serials Management by Microcomputer: The Potential of DBMS.
ERIC Educational Resources Information Center
Vogel, J. Thomas; Burns, Lynn W.
1984-01-01
Describes serials management at Philadelphia College of Textiles and Science library via a microcomputer, a file manager called PFS, and a relational database management system called dBase II. Check-in procedures, programing with dBase II, "static" and "active" databases, and claim procedures are discussed. Check-in forms are…
A Practical Guide to Enrollment and Retention Management in Higher Education.
ERIC Educational Resources Information Center
Dennis, Marguerite J.
This book offers a guide to designing and implementing an enrollment and retention management program for colleges and universities. Emphasis is on a system which integrates the activities of the offices of enrollment management, retention management, admission, financial aid, registration, research, and public relations, including publications…
41 CFR 101-4.135 - Designation of responsible employee and adoption of grievance procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Designation of... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Educational institutions... and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING...
The SMAP Dictionary Management System
NASA Technical Reports Server (NTRS)
Smith, Kevin A.; Swan, Christoper A.
2014-01-01
The Soil Moisture Active Passive (SMAP) Dictionary Management System is a web-based tool to develop and store a mission dictionary. A mission dictionary defines the interface between a ground system and a spacecraft. In recent years, mission dictionaries have grown in size and scope, making it difficult for engineers across multiple disciplines to coordinate the dictionary development effort. The Dictionary Management Systemaddresses these issues by placing all dictionary information in one place, taking advantage of the efficiencies inherent in co-locating what were once disparate dictionary development efforts.
Shuttle era waste management and biowaste monitoring
NASA Technical Reports Server (NTRS)
Sauer, R. L.; Fogal, G. L.
1976-01-01
The acquisition of crew biomedical data has been an important task on manned space missions. The monitoring of biowastes from the crew to support water and mineral balance studies and endocrine studies has been a valuable part of this activity. This paper will present a review of waste management systems used in past programs. This past experience will be cited as to its influence on the Shuttle design. Finally, the Shuttle baseline waste management system and the proposed Shuttle biomedical measurement and sampling systems will be presented.
Management information systems: their role in the marketing activities of HMOs.
Aronow, D B
1988-01-01
HMOs are particularly dependent on their information resources in providing cost-effective, high quality, accessible care. Understanding the role of MIS in HMO marketing activities may guide administrators in evaluating information systems applications within their organizations.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... Postsecondary Education Data System (IPEDS) 2013- 2016 AGENCY: Department of Education (ED), Institute of... Integrated Postsecondary Education Data System (IPEDS) is a web-based data collection system designed to... DEPARTMENT OF EDUCATION [Docket No.: ED-2013-ICCD-0029] Agency Information Collection Activities...
Diversified cropping systems support greater microbial cycling and retention of carbon and nitrogen
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, Alison E.; Hofmockel, Kirsten S.
2017-03-01
Diversifying biologically simple cropping systems often entails altering other management practices, such as tillage regime or nitrogen (N) source. We hypothesized that the interaction of crop rotation, N source, and tillage in diversified cropping systems would promote microbially-mediated soil C and N cycling while attenuating inorganic N pools. We studied a cropping systems trial in its 10th year in Iowa, USA, which tested a 2-yr cropping system of corn (Zea mays L.)/soybean [Glycine max (L.) Merr.] managed with conventional fertilizer N inputs and conservation tillage, a 3-yr cropping system of corn/soybean/small grain + red clover (Trifolium pratense L.), and amore » 4-yr cropping system of corn/soybean/small grain + alfalfa (Medicago sativa L.)/alfalfa. Three year and 4-yr cropping systems were managed with composted manure, reduced N fertilizer inputs, and periodic moldboard ploughing. We assayed soil microbial biomass carbon (MBC) and N (MBN), soil extractable NH4 and NO3, gross proteolytic activity of native soil, and potential activity of six hydrolytic enzymes eight times during the growing season. At the 0-20cm depth, native protease activity in the 4-yr cropping system was greater than in the 2-yr cropping system by a factor of 7.9, whereas dissolved inorganic N pools did not differ between cropping systems (P = 0.292). At the 0-20cm depth, MBC and MBN the 4-yr cropping system exceeded those in the 2-yr cropping system by factors of 1.51 and 1.57. Our findings suggest that diversified crop cropping systems, even when periodically moldboard ploughed, support higher levels of microbial biomass, greater production of bioavailable N from SOM, and a deeper microbially active layer than less diverse cropping systems.« less
Decision-support information system to manage mass casualty incidents at a level 1 trauma center.
Bar-El, Yaron; Tzafrir, Sara; Tzipori, Idan; Utitz, Liora; Halberthal, Michael; Beyar, Rafael; Reisner, Shimon
2013-12-01
Mass casualty incidents are probably the greatest challenge to a hospital. When such an event occurs, hospitals are required to instantly switch from their routine activity to conditions of great uncertainty and confront needs that exceed resources. We describe an information system that was uniquely designed for managing mass casualty events. The web-based system is activated when a mass casualty event is declared; it displays relevant operating procedures, checklists, and a log book. The system automatically or semiautomatically initiates phone calls and public address announcements. It collects real-time data from computerized clinical and administrative systems in the hospital, and presents them to the managing team in a clear graphic display. It also generates periodic reports and summaries of available or scarce resources that are sent to predefined recipients. When the system was tested in a nationwide exercise, it proved to be an invaluable tool for informed decision making in demanding and overwhelming situations such as mass casualty events.
McDermott, J J; Randolph, T F; Staal, S J
1999-08-01
Livestock kept or produced in smallholder farming systems are an important component of the agricultural economy in the developing world. The role of livestock on smallholder farms varies widely, providing draught power for crop production or as a production activity for subsistence needs or market sale under systems ranging from extensive pastoralist to intensive, peri-urban feeder and dairy systems. A set of unique conditions and features characterise smallholder systems, and these need to be appreciated when assessing the strategies that have evolved for managing animal health in smallholder systems, and evaluating opportunities for improving disease control strategies. To provide a framework for discussing animal health issues and analytical methodogies, a typology of smallholder livestock and crop/livestock systems is developed. The typology considers livestock systems both in terms of the degree of intensification, as measured by market orientation and intensity of factor use, and in terms of importance within the household economy, as measured by contribution to household income. A number of characteristics are identified that distinguish smallholder systems from the commercialised systems of developed countries, including the multiple functions livestock serve, the integrated nature of livestock activities, multiple objectives of producers and lower capacity to bear risk at the household level, as well as poor infrastructure, markets, and access to information at the community level. Three representative smallholder livestock systems from Africa are described in detail, highlighting the relevant characteristics and the implications for analysing disease control strategies. Smallholder dairy systems in Kenya demonstrate the role of individual producer decision-making for animal health management in intensive, market-oriented systems, placing emphasis on farm-level risk and production management aspects of disease control. In extensive pastoralist systems where epidemic disease are still important and infrastructure is poor, disease control primarily involves managing communal natural resources, requiring a different analytical approach. Finally, in crop farming systems using draught cattle, the livestock activity is an integrated component of crop production and this must be reflected in the approach used to evaluate draught animal health management. Continued development of analytical approaches and decision-support tools for disease control strategies adapted to the special characteristics of these systems will be needed as smallholder systems continue to intensify in areas with good market access, and those in marginal areas face increasing pressures to optimally manage the natural resource base.
NASIS data base management system - IBM 360/370 OS MVT implementation. 2: Overviews
NASA Technical Reports Server (NTRS)
1973-01-01
The systems overviews of the NASA Aerospace Safety Information System (NASIS) are presented. The overviews are directed toward informing management of a system's capabilities and requirements. The intent of the overviews is to introduce the system features to interested individuals. Each overview contains a description of the component's activities and roles in the overall system. The description includes charts and diagrams and a discussion of the performance requirements and growth potential of the module.
The Rise and Fall of an Education Management Information System in Liberia.
ERIC Educational Resources Information Center
Chapman, David W.
1991-01-01
Sponsors of education management information systems (EMIS) often underestimate EMIS's impact on other education sector activities and fail to provide individual and organizational incentives for encouraging use of improved educational data at the national level. Liberia's example illustrates the consequences of developing poor incentive…
Co-"Lab"oration: A New Paradigm for Building a Management Information Systems Course
ERIC Educational Resources Information Center
Breimer, Eric; Cotler, Jami; Yoder, Robert
2010-01-01
We propose a new paradigm for building a Management Information Systems course that focuses on laboratory activities developed collaboratively using Computer-Mediated Communication and Collaboration tools. A highlight of our paradigm is the "practice what you preach" concept where the computer communication tools and collaboration…
Volunteers in Leisure. A Management Perspective.
ERIC Educational Resources Information Center
Tedrick, Ted; Henderson, Karla
The first chapter of this monograph presents some major themes and fundamental issues surrounding leisure activities volunteers and their management from a system perspective. Chapter 2 discusses the results of a survey conducted to obtain a status report of selected volunteer system characteristics. The third chapter focuses on dealing with…
Soil phosphatase and urease activities impacted by cropping systems and water management
USDA-ARS?s Scientific Manuscript database
Soil enzymes can play an important role in nutrient availability to plants. Consequently, soil enzyme measurements can provide useful information on soil fertility for crop production. We examined the impact of cropping system and water management on phosphatase, urease, and microbial biomass C in s...
Transportation Systems. Curriculum Guide for Technology Education.
ERIC Educational Resources Information Center
Chastain, Gary K.
This curriculum guide for a 1-semester or 1-year course in transportation provides activities that show and explain many of the occupations, devices, and systems that are related to transportation on land, water, air, and space. The guide contains competencies (task lists), student competency records, and management sheets. Management sheets,…
The Dynamics of Instruction Systems: Feedback Control on Individually-Paced Instruction.
ERIC Educational Resources Information Center
Ammentorp, William; And Others
Feedback management in an individually-paced instruction system can be mathematically analyzed by the use of computer simulation models. Because of the student "down time" or waiting time associated with individualized instruction situations, reinforcement activities have been reduced to less than ideal levels. By proper time management the…
2014-12-02
CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Participating are Mike Bolger, Ground Systems Development and Operations program manager Mark Geyer, Orion program manager and Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Monitoring the live discussion is Brandi Dean, public affairs specialist from Johnson Space Center in Houston. Photo credit: NASA/Frankie Martin
Who Needs to Do What Where?: Using Learning Management Systems on Residential vs. Commuter Campuses
ERIC Educational Resources Information Center
Lonn, Steven; Teasley, Stephanie D.; Krumm, Andrew E.
2011-01-01
Learning Management Systems (LMS) are web-based systems allowing instructors and/or students to share materials and interact online. This study compared differences in LMS use between instructors and students at a large residential campus with students at a smaller commuter campus. Responses to an online survey about LMS activities and tools were…
ERIC Educational Resources Information Center
Wu, Yun-Wu; Lin, Yu-An; Wen, Ming-Hui; Perng, Yeng-Hong; Hsu, I-Ting
2016-01-01
The major purpose of this study is to develop an architectural design knowledge management learning system with corresponding learning activities to help the students have meaningful learning and improve their design capability in their learning process. Firstly, the system can help the students to obtain and share useful knowledge. Secondly,…
Learning Management Systems: Coupled Simulations and Assessments in a Digital Systems Course
ERIC Educational Resources Information Center
Wuttke, Heinz-Dietrich; Henke, Karsten
2009-01-01
Purpose: The content, provided in learning management systems (LMS), is often text oriented as in a usual textbook, extended by some animations and links. Hands on activities and experiments are not possible. The paper aims to give an overview about the concept to couple smart simulation and assessment tools with an LMS to provide a more…
Integrated Geo Hazard Management System in Cloud Computing Technology
NASA Astrophysics Data System (ADS)
Hanifah, M. I. M.; Omar, R. C.; Khalid, N. H. N.; Ismail, A.; Mustapha, I. S.; Baharuddin, I. N. Z.; Roslan, R.; Zalam, W. M. Z.
2016-11-01
Geo hazard can result in reducing of environmental health and huge economic losses especially in mountainous area. In order to mitigate geo-hazard effectively, cloud computer technology are introduce for managing geo hazard database. Cloud computing technology and it services capable to provide stakeholder's with geo hazards information in near to real time for an effective environmental management and decision-making. UNITEN Integrated Geo Hazard Management System consist of the network management and operation to monitor geo-hazard disaster especially landslide in our study area at Kelantan River Basin and boundary between Hulu Kelantan and Hulu Terengganu. The system will provide easily manage flexible measuring system with data management operates autonomously and can be controlled by commands to collects and controls remotely by using “cloud” system computing. This paper aims to document the above relationship by identifying the special features and needs associated with effective geohazard database management using “cloud system”. This system later will use as part of the development activities and result in minimizing the frequency of the geo-hazard and risk at that research area.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Utilization of Excess Real Property Title Report § 102-75.135 If no hazardous substance activity... time the property was owned by the United States. Other Necessary Information ...
Clinical process analysis and activity-based costing at a heart center.
Ridderstolpe, Lisa; Johansson, Andreas; Skau, Tommy; Rutberg, Hans; Ahlfeldt, Hans
2002-08-01
Cost studies, productivity, efficiency, and quality of care measures, the links between resources and patient outcomes, are fundamental issues for hospital management today. This paper describes the implementation of a model for process analysis and activity-based costing (ABC)/management at a Heart Center in Sweden as a tool for administrative cost information, strategic decision-making, quality improvement, and cost reduction. A commercial software package (QPR) containing two interrelated parts, "ProcessGuide and CostControl," was used. All processes at the Heart Center were mapped and graphically outlined. Processes and activities such as health care procedures, research, and education were identified together with their causal relationship to costs and products/services. The construction of the ABC model in CostControl was time-consuming. However, after the ABC/management system was created, it opened the way for new possibilities including process and activity analysis, simulation, and price calculations. Cost analysis showed large variations in the cost obtained for individual patients undergoing coronary artery bypass grafting (CABG) surgery. We conclude that a process-based costing system is applicable and has the potential to be useful in hospital management.
A computer aided engineering tool for ECLS systems
NASA Technical Reports Server (NTRS)
Bangham, Michal E.; Reuter, James L.
1987-01-01
The Computer-Aided Systems Engineering and Analysis tool used by NASA for environmental control and life support system design studies is capable of simulating atmospheric revitalization systems, water recovery and management systems, and single-phase active thermal control systems. The designer/analysis interface used is graphics-based, and allows the designer to build a model by constructing a schematic of the system under consideration. Data management functions are performed, and the program is translated into a format that is compatible with the solution routines.
Cui, Borui; Gao, Dian-ce; Xiao, Fu; ...
2016-12-23
This article provides a method in comprehensive evaluation of cost-saving potential of active cool thermal energy storage (CTES) integrated with HVAC system for demand management in non-residential building. The active storage is beneficial by shifting peak demand for peak load management (PLM) as well as providing longer duration and larger capacity of demand response (DR). In this research, a model-based optimal design method using genetic algorithm is developed to optimize the capacity of active CTES aiming for maximizing the life-cycle cost saving concerning capital cost associated with storage capacity as well as incentives from both fast DR and PLM. Inmore » the method, the active CTES operates under a fast DR control strategy during DR events while under the storage-priority operation mode to shift peak demand during normal days. The optimal storage capacities, maximum annual net cost saving and corresponding power reduction set-points during DR event are obtained by using the proposed optimal design method. Lastly, this research provides guidance in comprehensive evaluation of cost-saving potential of CTES integrated with HVAC system for building demand management including both fast DR and PLM.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cui, Borui; Gao, Dian-ce; Xiao, Fu
This article provides a method in comprehensive evaluation of cost-saving potential of active cool thermal energy storage (CTES) integrated with HVAC system for demand management in non-residential building. The active storage is beneficial by shifting peak demand for peak load management (PLM) as well as providing longer duration and larger capacity of demand response (DR). In this research, a model-based optimal design method using genetic algorithm is developed to optimize the capacity of active CTES aiming for maximizing the life-cycle cost saving concerning capital cost associated with storage capacity as well as incentives from both fast DR and PLM. Inmore » the method, the active CTES operates under a fast DR control strategy during DR events while under the storage-priority operation mode to shift peak demand during normal days. The optimal storage capacities, maximum annual net cost saving and corresponding power reduction set-points during DR event are obtained by using the proposed optimal design method. Lastly, this research provides guidance in comprehensive evaluation of cost-saving potential of CTES integrated with HVAC system for building demand management including both fast DR and PLM.« less
Operations system administration plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less
The Influence of Leadership in Implementing Management Systems
NASA Astrophysics Data System (ADS)
Nae, Ilie; Solomon, Gheorghe; Severin, Irina
2014-12-01
This paper presents a new perspective of the implementation of Management Systems within organizations in order to increase the success rate. The objective is to analyse how the leadership could influence positively or negatively the implementation, according to the leadership approach chosen. It offers a method to analyse the maturity of the leadership for any organization, based on existing leadership models, completing these models with specificities of a Management System. The Maturity Grid is extended to key elements of the Organizational Leadership: Strategic Planning, Process and Performance. The results expected are to change the current understanding of leadership during a Management System implementation(leadership seen as a principle) to an active leadership, implemented at organizational level. It propose an alternative of the classic management approach, to a Performance Management approach, that integrates naturally the leadership in all processes and methods
ERIC Educational Resources Information Center
Broering, Naomi C.; And Others
Strategic planning for an Integrated Academic Information Management System (IAIMS) for Georgetown University Medical Center is considered. The goal is to organize and transmit accessible and timely biomedical information where it is needed. Activities are proposed for education, research, patient care, management, sharing information on…
An Analysis of the Navy Regional Data Automation Center (NARDAC) chargeback System
1986-09-01
addition, operational control is concerned with performing predefined activities whereas management control relates to the organiza- tion’s goals and...In effect, the management control system monitors the progress of operations and alerts the "appropriate management level" when performance as measured...architecture, the financial control processes, and the audit function ( Brandon , 1978; Anderson, 1983). In an operating DP environment, however, non-financial
2014-12-02
CAPE CANAVERAL, Fla. – From left, Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager, participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Not shown, but also participating is Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin
Crisis Intervention and the Military Family: A Model Installation Program.
1988-03-07
abuse to less serious problems like budget management and good parenting techniques. Family dysfunction is defined in two categories: High and low...serious problems like budget management and good parenting techniques. Family dysfunction is defined in two categories: High and low intensity conflict. The...system activated to deal with the problem through the Family N, Advocacy Case Management Team. It is an excellent system that protects, helps and
MED31/437: A Web-based Diabetes Management System: DiabNet
Zhao, N; Roudsari, A; Carson, E
1999-01-01
Introduction A web-based system (DiabNet) was developed to provide instant access to the Electronic Diabetes Records (EDR) for end-users, and real-time information for healthcare professionals to facilitate their decision-making. It integrates portable glucometer, handheld computer, mobile phone and Internet access as a combined telecommunication and mobile computing solution for diabetes management. Methods: Active Server Pages (ASP) embedded with advanced ActiveX controls and VBScript were developed to allow remote data upload, retrieval and interpretation. Some advisory and Internet-based learning features, together with a video teleconferencing component make DiabNet web site an informative platform for Web-consultation. Results The evaluation of the system is being implemented among several UK Internet diabetes discussion groups and the Diabetes Day Centre at the Guy's & St. Thomas' Hospital. Many positive feedback are received from the web site demonstrating DiabNet is an advanced web-based diabetes management system which can help patients to keep closer control of self-monitoring blood glucose remotely, and is an integrated diabetes information resource that offers telemedicine knowledge in diabetes management. Discussion In summary, DiabNet introduces an innovative online diabetes management concept, such as online appointment and consultation, to enable users to access diabetes management information without time and location limitation and security concerns.
NASA Technical Reports Server (NTRS)
Lapenta, C. C.
1992-01-01
The functionality of the Distributed Active Archive Centers (DAACs) which are significant elements of the Earth Observing System Data and Information System (EOSDIS) is discussed. Each DAAC encompasses the information management system, the data archival and distribution system, and the product generation system. The EOSDIS DAACs are expected to improve the access to earth science data set needed for global change research.
What's wrong with hazard-ranking systems? An expository note.
Cox, Louis Anthony Tony
2009-07-01
Two commonly recommended principles for allocating risk management resources to remediate uncertain hazards are: (1) select a subset to maximize risk-reduction benefits (e.g., maximize the von Neumann-Morgenstern expected utility of the selected risk-reducing activities), and (2) assign priorities to risk-reducing opportunities and then select activities from the top of the priority list down until no more can be afforded. When different activities create uncertain but correlated risk reductions, as is often the case in practice, then these principles are inconsistent: priority scoring and ranking fails to maximize risk-reduction benefits. Real-world risk priority scoring systems used in homeland security and terrorism risk assessment, environmental risk management, information system vulnerability rating, business risk matrices, and many other important applications do not exploit correlations among risk-reducing opportunities or optimally diversify risk-reducing investments. As a result, they generally make suboptimal risk management recommendations. Applying portfolio optimization methods instead of risk prioritization ranking, rating, or scoring methods can achieve greater risk-reduction value for resources spent.
Reeder, Blaine; Turner, Anne M
2011-12-01
Responding to public health emergencies requires rapid and accurate assessment of workforce availability under adverse and changing circumstances. However, public health information systems to support resource management during both routine and emergency operations are currently lacking. We applied scenario-based design as an approach to engage public health practitioners in the creation and validation of an information design to support routine and emergency public health activities. Using semi-structured interviews we identified the information needs and activities of senior public health managers of a large municipal health department during routine and emergency operations. Interview analysis identified 25 information needs for public health operations management. The identified information needs were used in conjunction with scenario-based design to create 25 scenarios of use and a public health manager persona. Scenarios of use and persona were validated and modified based on follow-up surveys with study participants. Scenarios were used to test and gain feedback on a pilot information system. The method of scenario-based design was applied to represent the resource management needs of senior-level public health managers under routine and disaster settings. Scenario-based design can be a useful tool for engaging public health practitioners in the design process and to validate an information system design. Copyright © 2011 Elsevier Inc. All rights reserved.
Carrer, G M; Bonato, M; Smania, D; Barausse, A; Comis, C; Palmeri, L
2011-01-01
Conflicting water uses in coastal zones demand integrated approaches to achieve sustainable water resources management, protecting water quality while allowing those human activities which rely upon aquatic ecosystem services to thrive. This case study shows that the creation and simple management of hydraulic structures within constructed wetlands can markedly reduce the non-point pollution from agriculture and, simultaneously, benefit agricultural activities, particularly during hot and dry periods. The Vallevecchia wetland system is based on a reclaimed 900 ha-large drainage basin in Northern Italy, where droughts recently impacted agriculture causing water scarcity and saltwater intrusion. Rainwater and drained water are recirculated inside the system to limit saltwater intrusion, provide irrigation water during dry periods and reduce the agricultural nutrient loads discharged into the bordering, eutrophic Adriatic Sea. Monitoring (2003-2009) of water quality and flows highlights that the construction (ended in 2005) of a gated spillway to control the outflow, and of a 200,000 m3 basin for water storage, dramatically increased the removal of nutrients within the system. Strikingly, this improvement was achieved with a minimal management effort, e.g., each year the storage basin was filled once: a simple management of the hydraulic structures would greatly enhance the system efficiency, and store more water to irrigate and limit saltwater intrusion.
Magnetospheric MultiScale (MMS) System Manager
NASA Technical Reports Server (NTRS)
Schiff, Conrad; Maher, Francis Alfred; Henely, Sean Philip; Rand, David
2014-01-01
The Magnetospheric MultiScale (MMS) mission is an ambitious NASA space science mission in which 4 spacecraft are flown in tight formation about a highly elliptical orbit. Each spacecraft has multiple instruments that measure particle and field compositions in the Earths magnetosphere. By controlling the members relative motion, MMS can distinguish temporal and spatial fluctuations in a way that a single spacecraft cannot.To achieve this control, 2 sets of four maneuvers, distributed evenly across the spacecraft must be performed approximately every 14 days. Performing a single maneuver on an individual spacecraft is usually labor intensive and the complexity becomes clearly increases with four. As a result, the MMS flight dynamics team turned to the System Manager to put the routine or error-prone under machine control freeing the analysts for activities that require human judgment.The System Manager is an expert system that is capable of handling operations activities associated with performing MMS maneuvers. As an expert system, it can work off a known schedule, launching jobs based on a one-time occurrence or on a set reoccurring schedule. It is also able to detect situational changes and use event-driven programming to change schedules, adapt activities, or call for help.
41 CFR 101-4.455 - Textbooks and curricular material.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Textbooks and curricular material. 101-4.455 Section 101-4.455 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES...
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro are briefed on the properties of the tile used in the Shuttle's Thermal Protection System (TPS) by USA Manager of the TPS Facility Martin Wilson (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Process-driven information management system at a biotech company: concept and implementation.
Gobbi, Alberto; Funeriu, Sandra; Ioannou, John; Wang, Jinyi; Lee, Man-Ling; Palmer, Chris; Bamford, Bob; Hewitt, Robin
2004-01-01
While established pharmaceutical companies have chemical information systems in place to manage their compounds and the associated data, new startup companies need to implement these systems from scratch. Decisions made early in the design phase usually have long lasting effects on the expandability, maintenance effort, and costs associated with the information management system. Careful analysis of work and data flows, both inter- and intradepartmental, and identification of existing dependencies between activities are important. This knowledge is required to implement an information management system, which enables the research community to work efficiently by avoiding redundant registration and processing of data and by timely provision of the data whenever needed. This paper first presents the workflows existing at Anadys, then ARISE, the research information management system developed in-house at Anadys. ARISE was designed to support the preclinical drug discovery process and covers compound registration, analytical quality control, inventory management, high-throughput screening, lower throughput screening, and data reporting.
Exploration Systems Development (ESD) Approach to Enterprise Risk Management
NASA Technical Reports Server (NTRS)
Bauder, Stephen P.
2014-01-01
The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration (ESI) Risk. An ESI risk may require visibility and risk handling by multiple organizations. The Integrated Risk Working Group (IRWG) is a small team of Risk experts that are responsible for collaborating and communicating best practices. In addition, the forum facilitates proper integration of risks across the Enterprise. The IRWG uses a Continuous Risk Management approach for facilitating the identification, analysis, planning, tracking, and controlling of ESI Risks. The ESD Division, Programs, and Integrated Task Teams identify ESI Risks. The IRWG maintains a set of metrics for understanding Enterprise Risk process and the overall Risk Posture. The team is also actively involved in the modeling of risk for Enterprise Performance Management. With the Enterprise being constrained in Schedule and Budget, and with significant technical complexity, the appropriate use of Risk Management techniques is crucial to the success of the Enterprise. The IRWG achieves this through the modified approach, providing a forum for collaboration on risks that cross boundaries between the separate entities.
Intelligent Work Process Engineering System
NASA Technical Reports Server (NTRS)
Williams, Kent E.
2003-01-01
Optimizing performance on work activities and processes requires metrics of performance for management to monitor and analyze in order to support further improvements in efficiency, effectiveness, safety, reliability and cost. Information systems are therefore required to assist management in making timely, informed decisions regarding these work processes and activities. Currently information systems regarding Space Shuttle maintenance and servicing do not exist to make such timely decisions. The work to be presented details a system which incorporates various automated and intelligent processes and analysis tools to capture organize and analyze work process related data, to make the necessary decisions to meet KSC organizational goals. The advantages and disadvantages of design alternatives to the development of such a system will be discussed including technologies, which would need to bedesigned, prototyped and evaluated.
Monge, Paul
2006-01-01
Activity-based methods serve as a dynamic process that has allowed many other industries to reduce and control their costs, increase productivity, and streamline their processes while improving product quality and service. The method could serve the healthcare industry in an equally beneficial way. Activity-based methods encompass both activity based costing (ABC) and activity-based management (ABM). ABC is a cost management approach that links resource consumption to activities that an enterprise performs, and then assigns those activities and their associated costs to customers, products, or product lines. ABM uses the resource assignments derived in ABC so that operation managers can improve their departmental processes and workflows. There are three fundamental problems with traditional cost systems. First, traditional systems fail to reflect the underlying diversity of work taking place within an enterprise. Second, it uses allocations that are, for the most part, arbitrary Single step allocations fail to reflect the real work-the activities being performed and the associate resources actually consumed. Third, they only provide a cost number that, standing alone, does not provide any guidance on how to improve performance by lowering cost or enhancing throughput.
Funder Report on Decision Support Systems Project Dissemination Activities, Fiscal Year 1985.
ERIC Educational Resources Information Center
Tetlow, William L.
Dissemination activities for the Decision Support Systems (DSS) for fiscal year (FY) 1985 are reported by the National Center for Higher Education Management Systems (NCHEMS). The main means for disseminating results of the DSS research and development project has been through computer-generated video presentations at meetings of higher education…
1979-12-01
the functional management level, a real-time production con- trol system and an order processing system at the operational level. SIDMS was designed...at any one time. 26 An overview of the major software systems in operation is listed below: a. Major Software Systems: Order processing system e Order ... processing for the supply support center/AWP locker. e Order processing for the airwing squadron material controls. e Order processing for the IMA
Design and implementation of an intelligent belt system using accelerometer.
Liu, Botong; Wang, Duo; Li, Sha; Nie, Xuhui; Xu, Shan; Jiao, Bingli; Duan, Xiaohui; Huang, Anpeng
2015-01-01
Activity monitor systems are increasing used recently. They are important for athletes and casual users to manage physical activity during daily exercises. In this paper, we use a triaxial accelerometer to design and implement an intelligent belt system, which can detect the user's step and flapping motion. In our system, a wearable intelligent belt is worn on the user's waist to collect activity acceleration signals. We present a step detection algorithm to detect real-time human step, which has high accuracy and low complexity. In our system, an Android App is developed to manage the intelligent belt. We also propose a protocol, which can guarantee data transmission between smartphones and wearable belt effectively and efficiently. In addition, when users flap the belt in emergency, the smartphone will receive alarm signal sending by the belt, and then notifies the emergency contact person, which can be really helpful for users in danger. Our experiment results show our system can detect physical activities with high accuracy (overall accuracy of our algorithm is above 95%) and has an effective alarm subsystem, which is significant for the practical use.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, United Space Alliance (USA) Deputy Space Shuttle Program Manager of Operations Loren Shriver, USA Associate Program Manager of Ground Operations Andy Allen, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and USA Vice President and Space Shuttle Program Manager Howard DeCastro examine a tile used in the Shuttle's Thermal Protection System (TPS) in KSC's TPS Facility. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Brooks, Jennifer C; Pinto, Meredith; Gill, Adrienne; Hills, Katherine E; Murthy, Shivani; Podgornik, Michelle N; Hernandez, Luis F; Rose, Dale A; Angulo, Frederick J; Rzeszotarski, Peter
2016-07-08
Establishing a functional incident management system (IMS) is important in the management of public health emergencies. In response to the 2014-2016 Ebola virus disease (Ebola) epidemic in West Africa, CDC established the Emergency Management Development Team (EMDT) to coordinate technical assistance for developing emergency management capacity in Guinea, Liberia, and Sierra Leone. EMDT staff, deployed staff, and partners supported each country to develop response goals and objectives, identify gaps in response capabilities, and determine strategies for coordinating response activities. To monitor key programmatic milestones and assess changes in emergency management and response capacities over time, EMDT implemented three data collection methods in country: coordination calls, weekly written situation reports, and an emergency management dashboard tool. On the basis of the information collected, EMDT observed improvements in emergency management capacity over time in all three countries. The collaborations in each country yielded IMS structures that streamlined response and laid the foundation for long-term emergency management programs.The activities summarized in this report would not have been possible without collaboration with many U.S and international partners (http://www.cdc.gov/vhf/ebola/outbreaks/2014-west-africa/partners.html).
Y-12 Integrated Materials Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alspaugh, D. H.; Hickerson, T. W.
2002-06-03
The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclearmore » material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.« less
NASA Technical Reports Server (NTRS)
1974-01-01
System design and performance of the Skylab Airlock Module and Payload Shroud are presented for the communication and caution and warning systems. Crew station and storage, crew trainers, experiments, ground support equipment, and system support activities are also reviewed. Other areas documented include the reliability and safety programs, test philosophy, engineering project management, and mission operations support.
Ada and software management in NASA: Assessment and recommendations
NASA Technical Reports Server (NTRS)
1989-01-01
Recent NASA missions have required software systems that are larger, more complex, and more critical than NASA software systems of the past. The Ada programming language and the software methods and support environments associated with it are seen as potential breakthroughs in meeting NASA's software requirements. The findings of a study by the Ada and Software Management Assessment Working Group (ASMAWG) are presented. The study was chartered to perform three tasks: (1) assess the agency's ongoing and planned Ada activities; (2) assess the infrastructure (standards, policies, and internal organizations) supporting software management and the Ada activities; and (3) present an Ada implementation and use strategy appropriate for NASA over the next 5 years.
Quality Management Plan for EPA Region 1
The QMP describes policies, procedures & management systems within EPA NE that govern quality assurance & quality control activities supporting the transparency & scientific defensibility of environmental data collected, used & disseminated by the Region.
Wang, Penny; Luo, Dee; Lu, Fengxin; Elias, Josephine S; Landman, Adam B; Michaud, Kaleb D
2018-01-01
Background Rheumatoid arthritis flares have a profound effect on patients, causing pain and disability. However, flares often occur between regularly scheduled health care provider visits and are, therefore, difficult to monitor and manage. We sought to develop a mobile phone app combined with a population management system to help track RA flares between visits. Objective The objective of this study is to implement the mobile app plus the population management system to monitor rheumatoid arthritis disease activity between scheduled health care provider visits over a period of 6 months. Methods This is a randomized controlled trial that lasts for 6 months for each participant. We aim to recruit 190 patients, randomized 50:50 to the intervention group versus the control group. The intervention group will be assigned the mobile app and be prompted to answer daily questionnaires sent to their mobile devices. Both groups will be assigned a population manager, who will communicate with the participants via telephone at 6 weeks and 18 weeks. The population manager will also communicate with the participants in the intervention group if their responses indicate a sustained increase in rheumatoid arthritis disease activity. To assess patient satisfaction, the primary outcomes will be scores on the Treatment Satisfaction Questionnaire for Medication as well as the Perceived Efficacy in Patient-Physician Interactions questionnaire at 6 months. To determine the effect of the mobile app on rheumatoid arthritis disease activity, the primary outcome will be the Clinical Disease Activity Index at 6 months. Results The trial started in November 2016, and an estimated 2.5 years will be necessary to complete the study. Study results are expected to be published by the end of 2019. Conclusions The completion of this study will provide important data regarding the following: (1) the assessment of validated outcome measures to assess rheumatoid arthritis disease activity with a mobile app between routinely scheduled health care provider visits, (2) patient engagement in monitoring their condition, and (3) communication between patients and health care providers through the population management system. Trial Registration ClinicalTrials.gov NCT02822521, http://clinicaltrials.gov/ct2/show/NCT02822521 (Archived by WebCite at http://www.webcitation.org/6xed3kGPd) PMID:29643053
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians demonstrate the construction of a thermal blanket used in the Shuttle's thermal protection system for USA Vice President and Space Shuttle Program Manager Howard DeCastro (second from left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (third from left) watch as a USA technician (right) creates a tile for use in the Shuttle's Thermal Protection System (TPS). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-05
... submit the following information collection to the Office of Management and Budget (OMB) for review and... of the Currency, Board of Governors of the Federal Reserve System, Federal Deposit Insurance... agencies expect all financial institutions \\1\\ to manage liquidity risk using processes and systems that...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-29
... submit the following information collection to the Office of Management and Budget (OMB) for review and... of the Currency, Board of Governors of the Federal Reserve System, Federal Deposit Insurance... agencies expect all financial institutions \\1\\ to manage liquidity risk using processes and systems that...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-16
... defect. ($17,335). Web-based Document Management System: Funding was provided to continue to provide a web-based document management system to better enable the handling of thousands of recreational... program strategy support to the nation-wide RBS effort. The goal is to coordinate the RBS outreach...
25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?
Code of Federal Regulations, 2013 CFR
2013-04-01
... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...
25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?
Code of Federal Regulations, 2014 CFR
2014-04-01
... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...
25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?
Code of Federal Regulations, 2012 CFR
2012-04-01
... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...
Evaluation of Mobile Assessment in a Learning Management System
ERIC Educational Resources Information Center
Bogdanovic, Zorica; Barac, Dušan; Jovanic, Branislav; Popovic, Snežana; Radenkovic, Božidar
2014-01-01
This article discusses the problem of using and delivering educational content from the Moodle learning management system to mobile devices. The primary goal of this study was to investigate the students' habits, motivations and technical possibilities in order to incorporate mobile-learning activities in the e-learning process. A mobile quiz has…
Cost-Saving Collaboration: Purchasing and Deploying a Statewide Learning Management System
ERIC Educational Resources Information Center
Klonoski, Ed
2005-01-01
Higher education is working to integrate next-generation education technology into its learning activities and is struggling to find cost-effective approaches. The learning management systems (LMSs) that evolved to provide support for distance education efforts have been adopted for use by the larger learning community, but the expense of…
A Service Oriented Architecture to Integrate Mobile Assessment in Learning Management Systems
ERIC Educational Resources Information Center
Riad, A. M.; El-Ghareeb, H. A.
2008-01-01
Mobile Learning (M-Learning) is an approach to E-Learning that utilizes mobile devices. Learning Management System (LMS) should enable M-Learning. Unfortunately, M-Learning is not the same at each educational institution. Assessment is one of the learning activities that can be achieved electronically and via mobile device. Mobile assessment…
Croft, M G; Fraser, G C; Gaul, W N
2011-07-01
A Laboratory Information Management System (LIMS) was used to manage the laboratory data and support planning and field activities as part of the response to the equine influenza outbreak in Australia in 2007. The database structure of the LIMS and the system configurations that were made to best handle the laboratory implications of the disease response are discussed. The operational aspects of the LIMS and the related procedures used at the laboratory to process the increased sample throughput are reviewed, as is the interaction of the LIMS with other corporate systems used in the management of the response. Outcomes from this tailored configuration and operation of the LIMS resulted in effective provision and control of the laboratory and laboratory information aspects of the response. The extent and immediate availability of the information provided from the LIMS was critical to some of the activities of key operatives involved in controlling the response. © 2011 The Authors. Australian Veterinary Journal © 2011 Australian Veterinary Association.
Clinical information systems: cornerstone for an efficient hospital management.
Lovis, Christian
2011-01-01
The university hospitals of Geneva are the largest consortium of public hospitals in Switzerland. This organization is born in 1995, after a political decision to merge the seven public and teaching hospitals of the Canton of Geneva. From an information technologies perspective, it took several years to reach a true unified vision of the complete organization. The clinical information system is deployed in all sites covering in- and outpatient cares. It is seen as the cornerstone of information management and flow in the organization, for direct patient care and decision support, but also for the management to drive, improve and leverage the activities, for better efficiency, quality and safety of care, but also to drive processes. As the system has become more important for the organization, it has required progressive changes in its governance. The high importance of interoperability and use of formal representation has become a major challenge in order to be able to reuse clinical information for real-time care and management activities, and for secondary usage such as billing, resource management, strategic planning and clinical research. This paper proposes a short overview of the tools allowing to leverage the management for physicians, nurses, human resources and hospital governance.
Classification systems for natural resource management
Kleckner, Richard L.
1981-01-01
Resource managers employ various types of resource classification systems in their management activities such as inventory, mapping, and data analysis. Classification is the ordering or arranging of objects into groups or sets on the basis of their relationships, and as such, provide the resource managers with a structure for organizing their needed information. In addition of conforming to certain logical principles, resource classifications should be flexible, widely applicable to a variety of environmental conditions, and useable with minimal training. The process of classification may be approached from the bottom up (aggregation) or the top down (subdivision) or a combination of both, depending on the purpose of the classification. Most resource classification systems in use today focus on a single resource and are used for a single, limited purpose. However, resource managers now must employ the concept of multiple use in their management activities. What they need is an integrated, ecologically based approach to resource classification which would fulfill multiple-use mandates. In an effort to achieve resource-data compatibility and data sharing among Federal agencies, and interagency agreement has been signed by five Federal agencies to coordinate and cooperate in the area of resource classification and inventory.
Advanced Air Transportation Technologies Project, Final Document Collection
NASA Technical Reports Server (NTRS)
Mogford, Richard H.; Wold, Sheryl (Editor)
2008-01-01
This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.
Nessi, Simone; Rigamonti, Lucia; Grosso, Mario
2015-09-01
A life cycle assessment was carried out to evaluate the effects of two packaging waste prevention activities on the overall environmental performance of the integrated municipal waste management system of Lombardia region, Italy. The activities are the use of refined tap water instead of bottled water for household consumption and the substitution of liquid detergents packaged in single-use containers by those distributed 'loose' through self-dispensing systems and refillable containers. A 2020 baseline scenario without waste prevention is compared with different waste prevention scenarios, where the two activities are either separately or contemporaneously implemented, by assuming a complete substitution of the traditional product(s). The results show that, when the prevention activities are carried out effectively, a reduction in total waste generation ranging from 0.14% to 0.66% is achieved, corresponding to a 1-4% reduction of the affected packaging waste fractions (plastics and glass). However, the improvements in the overall environmental performance of the waste management system can be far higher, especially when bottled water is substituted. In this case, a nearly 0.5% reduction of the total waste involves improvements ranging mostly between 5 and 23%. Conversely, for the substitution of single-use packaged liquid detergents (0.14% reduction of the total waste), the achieved improvements do not exceed 3% for nearly all impact categories. © The Author(s) 2015.
ERIC Educational Resources Information Center
Toktarova, Vera Ivanovna
2015-01-01
The present study considers issues related to the planning and implementation of the system of pedagogical management of learning activities of students in the context of modern electronic educational environment of the higher education institution. As a methodological basis considered a differentiated approach based on flexible individual…
12 CFR 225.21 - Prohibited nonbanking activities and acquisitions; exempt bank holding companies.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM BANK HOLDING COMPANIES AND CHANGE IN BANK... securities or assets of a company engaged in, any activity other than: (1) Banking or managing or controlling... to be so closely related to banking, or managing or controlling banks as to be a proper incident...
Almén, Anja; Båth, Magnus
2016-06-01
The overall aim of the present work was to develop a conceptual framework for managing radiation dose in diagnostic radiology with the intention to support optimisation. An optimisation process was first derived. The framework for managing radiation dose, based on the derived optimisation process, was then outlined. The outset of the optimisation process is four stages: providing equipment, establishing methodology, performing examinations and ensuring quality. The optimisation process comprises a series of activities and actions at these stages. The current system of diagnostic reference levels is an activity in the last stage, ensuring quality. The system becomes a reactive activity only to a certain extent engaging the core activity in the radiology department, performing examinations. Three reference dose levels-possible, expected and established-were assigned to the three stages in the optimisation process, excluding ensuring quality. A reasonably achievable dose range is also derived, indicating an acceptable deviation from the established dose level. A reasonable radiation dose for a single patient is within this range. The suggested framework for managing radiation dose should be regarded as one part of the optimisation process. The optimisation process constitutes a variety of complementary activities, where managing radiation dose is only one part. This emphasises the need to take a holistic approach integrating the optimisation process in different clinical activities. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
A software for managing after-hours activities in research user facilities
Camino, F. E.
2017-05-01
Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.
A software for managing after-hours activities in research user facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Camino, F. E.
Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.
Using Group Drawings Activities to Facilitate the Understanding of the Systemic Aspects of Projects
ERIC Educational Resources Information Center
Arantes do Amaral, João Alberto; Hess, Aurélio; Gonçalves, Paulo; Rodrigues, Vinícius Picanço
2017-01-01
In this article, we present our findings regarding promoting group drawing activities in order to facilitate the learning of systemic aspects of projects. We discuss the approach we used to engage the students and foster learning in our classes. We used group drawing activities in two project management undergraduate courses. The courses, which…
NASA Technical Reports Server (NTRS)
Zee, Stacey; Murray, D.
2009-01-01
The Federal Aviation Administration (FAA), Office of Commercial Space Transportation (AST) licenses and permits U.S. commercial space launch and reentry activities, and licenses the operation of non-federal launch and reentry sites. ASTs mission is to ensure the protection of the public, property, and the national security and foreign policy interests of the United States during commercial space transportation activities and to encourage, facilitate, and promote U.S. commercial space transportation. AST faces unique challenges of ensuring the protection of public health and safety while facilitating and promoting U.S. commercial space transportation. AST has developed an Environmental Management System (EMS) and a Safety Management System (SMS) to help meet its mission. Although the EMS and SMS were developed independently, the systems share similar elements. Both systems follow a Plan-Do-Act-Check model in identifying potential environmental aspects or public safety hazards, assessing significance in terms of severity and likelihood of occurrence, developing approaches to reduce risk, and verifying that the risk is reduced. This paper will describe the similarities between ASTs EMS and SMS elements and how AST is building a collaborative approach in environmental and safety management to reduce impacts to the environment and risks to the public.
NASA Astrophysics Data System (ADS)
Brax, Christoffer; Niklasson, Lars
2009-05-01
Maritime Domain Awareness is important for both civilian and military applications. An important part of MDA is detection of unusual vessel activities such as piracy, smuggling, poaching, collisions, etc. Today's interconnected sensorsystems provide us with huge amounts of information over large geographical areas which can make the operators reach their cognitive capacity and start to miss important events. We propose and agent-based situation management system that automatically analyse sensor information to detect unusual activity and anomalies. The system combines knowledge-based detection with data-driven anomaly detection. The system is evaluated using information from both radar and AIS sensors.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salgado, M.M.; Benitez, J.C.; Pernas, R.
2007-07-01
The Center for Radiation Protection and Hygiene (CPHR) is the institution responsible for the management of radioactive wastes generated from nuclear applications in medicine, industry and research in Cuba. Radioactive Waste Management Service is provided at a national level and it includes the collection and transportation of radioactive wastes to the Centralized Waste Management Facilities, where they are characterized, segregated, treated, conditioned and stored. A Quality Management System, according to the ISO 9001 Standard has been implemented for the RWM Service at CPHR. The Management System includes the radiation safety requirements established for RWM in national regulations and in themore » Licence's conditions. The role of the Regulatory Body and the Radiation Protection Officer in the Quality Management System, the authorization of practices, training and personal qualification, record keeping, inspections of the Regulatory Body and internal inspection of the Radiation Protection Officer, among other aspects, are described in this paper. The Quality Management System has shown to be an efficient tool to demonstrate that adequate measures are in place to ensure the safety in radioactive waste management activities and their continual improvement. (authors)« less
PKK-man: A System to Manage PKK Activities in Indonesia
NASA Astrophysics Data System (ADS)
Anggraini, R. N. E.; Rochimah, S.; Soedjono, A. R.
2016-01-01
PKK community is a well-known women community in Indonesia. PKK was formed from national level to neighbourhood association level and usually has a regular event and several activities. This is the reason why PKK is expected to play an active role in national development, started from PKK member family. This research intends to develop a system to manage PKK activities and prepares information sharing in PKK community. The application was built using client server architecture. The web version of PKK-man was developed using PHP framework and was prepared to be accessed by PKK board member. Since they will deal with more data so a wide interface in web version will be more suitable. While the ordinary PKK member can access PKK-man through mobile application. The mobile version was built using PhoneGap framework that supports different mobile operating systems.
Five Years Experience with the CLINFO Data Base Management and Analysis System
Johnston, Howard B.; Higgins, Stanley B.; Harris, Thomas R.; Lacy, William W.
1982-01-01
The CLINFO data base management and analysis system is the result of a project sponsored by the National Institutes of Health (NIH) to identify data management and data analysis activities that are critical to clinical investigation. In February of 1977, one of the three prototype CLINFO systems developed by the RAND Corporation was installed in the Clinical Research Center (CRC) at Vanderbilt University Medical Center. The Vanderbilt experience with this CLINFO system over the past five years is described. Its impact on the way clinical research data has been managed and analyzed is discussed in terms of utilization by more than 100 clinical investigators and their staff. The Vanderbilt evaluation of the system and additional information on its usage since the original evaluation is presented. Factors in the design philosophy of CLINFO which create an environment that enhances the clinical investigator's capabilities to perform computer data management and analysis of his data are discussed.
Fry, Emory A.; Lenert, Leslie A.
2005-01-01
Most medical facilities practice managing the large numbers of seriously injured patients expected during catastrophic events. As the demands on the healthcare team increase, however, the challenges faced by managers escalate, workflow bottlenecks develop and system capacity decreases. This paper describes MASCAL, an integrated software–hardware system designed to enhance management of resources at a hospital during a mass casualty situation. MASCAL uses active 802.11b asset tags to track patients, equipment and staff during the response to a disaster. The system integrates tag position information with data from personnel databases, medical information systems, registration applications and the US Navy’s TACMEDCS triage application in a custom visual disaster management environment. MASCAL includes interfaces for a hospital command center, local area managers (emergency room, operating suites, radiology, etc.) and registration personnel. MASCAL is an operational system undergoing functional evaluation at the Naval Medical Center, San Diego, CA. PMID:16779042
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-04
... Faulk, EPA Headquarters, Office of Water, Office of Wastewater Management at tel.: 202-564-0768 or e... activities. Resource management parties 924110 Government (includes State departments Administration of... Solid in the regulation, State Waste Management administration, environmental agencies, and Programs...
Knowledge management: an application to wildfire prevention planning
Daniel L Schmoldt
1989-01-01
Residential encroachment into wildland areas places an additional burden on fire management activities. Prevention programs, fuel management efforts, and suppression strategies, previously employed in wildland areas, require modification for protection of increased values at risk in this interface area. Knowledge-based computer systems are being investigated as...
Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.
ERIC Educational Resources Information Center
Foerster, James; And Others
Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…
Using soft systems methodology to develop a simulation of out-patient services.
Lehaney, B; Paul, R J
1994-10-01
Discrete event simulation is an approach to modelling a system in the form of a set of mathematical equations and logical relationships, usually used for complex problems, which are difficult to address by using analytical or numerical methods. Managing out-patient services is such a problem. However, simulation is not in itself a systemic approach, in that it provides no methodology by which system boundaries and system activities may be identified. The investigation considers the use of soft systems methodology as an aid to drawing system boundaries and identifying system activities, for the purpose of simulating the outpatients' department at a local hospital. The long term aims are to examine the effects that the participative nature of soft systems methodology has on the acceptability of the simulation model, and to provide analysts and managers with a process that may assist in planning strategies for health care.
Paducah Site annual report for 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Belcher, G.
1997-01-01
The Paducah Gaseous Diffusion Plant, located in McCracken County, Kentucky, has been producing enriched uranium since 1952. In July 1993, the US department of Energy (DOE) leased the production areas of the site to the US Enrichment Corporation (USEC). A new subsidiary of Lockheed Martin Corporation, Lockheed Martin Utility Services, manages the leased facilities for USEC. DOE maintains responsibility for the environmental restoration, waste management, and enrichment facilities activities at the plant through its management contractor, Lockheed Martin Energy Systems. The purpose of this document is to summarize calendar year 1995 environmental monitoring activities for DOE activities at the Paducahmore » Site. DOE requires all of its facilities to conduct and document such activities annually. This report does not include USEC environmental activities.« less
NASA Technical Reports Server (NTRS)
1983-01-01
Inventory Management System (SIMS) consists of series of integrated support programs providing supply support for both Shuttle program and Kennedy Space Center base opeations SIMS controls all supply activities and requirements from single point. Programs written in COBOL.
Environmental Enterprise Risk Management Benefits for a Government Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linda Guinn
An often overlooked advantage that an Environmental Enterprise Risk Management System (ERMS) has to organizations is the added protection from the Civil False Claims Act (FCA) for activities under a government contract.
41 CFR 102-38.145 - Must we allow for inspection of the personal property to be sold?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Must we allow for... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Pre-Sale Activities § 102-38.145 Must we allow for...
41 CFR 102-38.145 - Must we allow for inspection of the personal property to be sold?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Must we allow for... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Pre-Sale Activities § 102-38.145 Must we allow for...
41 CFR 102-38.145 - Must we allow for inspection of the personal property to be sold?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Must we allow for... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Pre-Sale Activities § 102-38.145 Must we allow for...
41 CFR 102-38.145 - Must we allow for inspection of the personal property to be sold?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Must we allow for... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Pre-Sale Activities § 102-38.145 Must we allow for...
41 CFR 102-38.145 - Must we allow for inspection of the personal property to be sold?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Must we allow for... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Pre-Sale Activities § 102-38.145 Must we allow for...
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Badger, W.; Beckman, C. S.; Beshers, G.; Hammerslag, D.; Kimball, J.; Kirslis, P. A.; Render, H.; Richards, P.; Terwilliger, R.
1984-01-01
The project to automate the management of software production systems is described. The SAGA system is a software environment that is designed to support most of the software development activities that occur in a software lifecycle. The system can be configured to support specific software development applications using given programming languages, tools, and methodologies. Meta-tools are provided to ease configuration. Several major components of the SAGA system are completed to prototype form. The construction methods are described.
Quicker, slicker, and better? An evaluation of a web-based human resource management system
NASA Astrophysics Data System (ADS)
Gibb, Stephen; McBride, Andrew
2001-10-01
This paper reviews the design and development of a web based Human Resource Management (HRM) system which has as its foundation a 'capability profiler' tool for analysing individual or team roles in organisations. This provides a foundation for managing a set of integrated activities in recruitment and selection, performance and career management, and training and development for individuals, teams, and whole organisations. The challenges of representing and processing information about the human side of organisation encountered in the design and implementation of such systems are evident. There is a combination of legal, practical, technical and philosophical issues to be faced in the processes of defining roles, selecting staff, monitoring and managing the performance of employees in the design and implementation of such systems. The strengths and weaknesses of web based systems in this context are evaluated. This evaluation highlights both the potential, given the evolution of broader Enterprise Resource Planning (ERP) systems and strategies in manufacturing, and concerns about the migration of HRM processes to such systems.
NASA Technical Reports Server (NTRS)
Braman, Julia M. B.; Wagner, David A.
2010-01-01
Safe human exploration in space missions requires careful management of limited resources such as breathable air and stored electrical energy. Daily activities for astronauts must be carefully planned with respect to such resources, and usage must be monitored as activities proceed to ensure that they can be completed while maintaining safe resource margins. Such planning and monitoring can be complex because they depend on models of resource usage, the activities being planned, and uncertainties. This paper describes a system - and the technology behind it - for energy management of the NASA-Johnson Space Center's Multi-Mission Space Exploration Vehicles (SEV), that provides, in an onboard advisory mode, situational awareness to astronauts and real-time guidance to mission operators. This new capability was evaluated during this year's Desert RATS (Research and Technology Studies) planetary exploration analog test in Arizona. This software aided ground operators and crew members in modifying the day s activities based on the real-time execution of the plan and on energy data received from the rovers.
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Clinical-outcome-based demand management in health services.
Brogan, C; Lawrence, D; Mayhew, L
2008-01-01
THE PROBLEM OF MANAGING DEMAND: Most healthcare systems have 'third-party payers' who face the problem of keeping within budgets despite pressures to increase resources due to the ageing population, new technologies and patient demands to lower thresholds for care. This paper uses the UK National Health Service as a case study to suggest techniques for system-based demand management, which aims to control demand and costs whilst maintaining the cost-effectiveness of the system. The technique for managing demand in primary, elective and urgent care consists of managing treatment thresholds for appropriate care, using a whole-systems approach and costing the care elements in the system. It is important to analyse activity in relation to capacity and demand. Examples of using these techniques in practice are given. The practical effects of using such techniques need evaluation. If these techniques are not used, managing demand and limiting healthcare expenditure will be at the expense of clinical outcomes and unmet need, which will perpetuate financial crises.
Cheng, Siu Mee; Thompson, Leslee J
2006-01-01
A performance management system has been implemented by Cancer Care Ontario (CCO). This system allows for the monitoring and management of 11 integrated cancer programs (ICPs) across the Province of Ontario. The system comprises of four elements: reporting frequency, reporting requirements, review meetings and accountability and continuous improvement activities. CCO and the ICPs have recently completed quarterly performance review exercises for the last two quarters of the fiscal year 2004-2005. The purpose of this paper is to address some of the key lessons learned. The paper provides an outline of the CCO performance management system. These lessons included: data must be valid and reliable; performance management requires commitments from both parties in the performance review exercises; streamlining performance reporting is beneficial; technology infrastructure which allows for cohesive management of data is vital for a sustainable performance management system; performance indicators need to stand up to scrutiny by both parties; and providing comparative data across the province is valuable. Critical success factors which would help to ensure a successful performance management system include: corporate engagement from various parts of an organization in the review exercises; desire to focus on performance improvement and avoidance of blaming; and strong data management systems. The performance management system is a practical and sustainable system that allows for performance improvement of cancer care services. It can be a vital tool to enhance accountability within the health care system. The paper demonstrates that the performance management system supports accountability in the cancer care system for Ontario, and reflects the principles of the provincial governments commitment to continuous improvement of healthcare.
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
2015-07-01
Requisitioning and Issue Procedures OIG Office of Inspector General OMB Office of Management and Budget QMD Quantitative Methods Division SABRS ...Reporting System ( SABRS )—and transactions recorded in the current year may be improperly recorded to appropriations not included in the Marine Corps...Accountability System (DCAS)55 to the Marine Corps’ SABRS general ledger system and through the Defense Departmental Reporting Systems (DDRS) to financial
Modeling of the Space Station Freedom data management system
NASA Technical Reports Server (NTRS)
Johnson, Marjory J.
1990-01-01
The Data Management System (DMS) is the information and communications system onboard Space Station Freedom (SSF). Extensive modeling of the DMS is being conducted throughout NASA to aid in the design and development of this vital system. Activities discussed at NASA Ames Research Center to model the DMS network infrastructure are discussed with focus on the modeling of the Fiber Distributed Data Interface (FDDI) token-ring protocol and experimental testbedding of networking aspects of the DMS.
Briggs, D S; Tejativaddhana, P; Cruickshank, M; Fraser, J; Campbell, S
2010-11-01
There have been recent calls for a renewed worldwide focus on primary health care. The Thai-Australian Health Alliance addresses this call by developing health care management capability in primary health care professionals in rural Thailand. This paper describes the history and current activities of the Thai-Australian Health Alliance and its approaches to developing health care management capacity for primary care services through international collaborations in research, education and training over a sustained time period. The Alliance's approach is described herein as a distributed network of practices with access to shared knowledge through collaboration. Its research and education approaches involve action research, multi-methods projects, and evaluative studies in the context of workshops and field studies. WHO principles underpin this approach, with countries sharing practical experiences and outcomes, encouraging leadership and management resource networks, creating clearing houses/knowledge centres, and harmonising and aligning partners with their country's health systems. Various evaluations of the Alliance's activities have demonstrated that a capacity building approach that aligns researchers, educators and health practitioners in comparative and reflective activities can be effective in transferring knowledge and skills among a collaboration's partners. Project participants, including primary health care practitioners, health policy makers and academics embraced the need to acquire management skills to sustain primary care units. Participants believe that the approaches described herein were crucial to developing the management skills needed of health care professionals for rural and remote primary health care. The implementation of this initiative was challenged by pre-existing low opinions of the importance of the management role in health care, but with time the Alliance's activities highlighted for all the importance of health care management. Acceptance of its activities and goals are evidenced by the establishment of a Centre of Leadership Expertise in Health Management and the endorsement of the Phitsanulok Declaration by more than 470 primary health care practitioners, academics and policy makers. Problems with the primary health care delivery system in rural Thailand continue, but the Alliance has successfully implemented a cross cultural strategic collaboration through a continuity of activities to augment practice management capacities in primary care practices.
This presentation first provides an overview of U.S.EPA research activities on water infrastructure condition assessment, system rehabilitation, and asset management. It then describes in detail specific activities in pipe leak detection, water conservation and the advanced wate...
Professional development of undergraduates in wildlife ecology and management
Moen, A.N.; Boomer, G.S.; Runge, M.C.
2000-01-01
This paper describes a cooperative learning environment and a course continuum in wildlife ecology and management which promote the professional development of undergraduates. Students learn about functional relationships in ecology and management in lecture periods that focus on concepts, with participation by students in active learning exercises. Laboratory periods are designed around learning groups, which consist of freshmen through graduate students who focus on a common theme as they work together, while each student is responsible for his or her own research. Undergraduate teaching assistants and senior wildlife management students coordinate the activities of the learning groups and supervise the student research, learning about personnel management by active participation in leadership roles. Publication of research results on a wildlife ecology and management information system in the department's Cooperative Learning Center enables students to share what they learn with their peers and with students who follow in later years.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... Management Information System testing information, and to communicate with entities subject to the program... Office of Information and Regulatory Affairs, Office of Management and Budget. Comments should be... Information and Regulatory Affairs, Office of Management and Budget, Docket Library, Room 10102, 725 17th...
ERIC Educational Resources Information Center
Jackson, Cliff; Simoncini, Kym; Davidson, Mark
2013-01-01
Classroom management is a serious concern for beginning teachers including preservice teachers. The Queensland Department of Education, Training and Employment (DETE) has developed the Essential Skills for Classroom Management (ESCM), a system of positive and pro-active strategies for maintaining supportive learning environments. In addition, the…
DOT National Transportation Integrated Search
1974-08-01
Volume 2 contains the analysis and description of air traffic management activities at three levels of detail - functions, subfunctions, and tasks. A total of 265 tasks are identified and described, and the flow of information inputs and outputs amon...
Multiple species inventory and monitoring technical guide
P.N. Manley; B. Van Horne; J.K. Roth; W.J. Zielinski; M.M. McKenzie; T.J. Weller; F.W. Weckerly; C. Vojta
2006-01-01
The National Forest Management Act (1976) recognizes the importance of maintaining species and community diversity on National Forest System (NFS) lands as a critical component of our ecological and cultural heritage. Monitoring is required of land management to assess the success of management activities in meeting legal, regulatory, and policy objectives, including...
Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2016.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ziock, Robert; Little, Bonnie Colleen
The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consisted of a containment cell, two treatment systems, four associated waste staging and storage areas, and support areas; all were used for management of remediation wastes between 1997 and 2003.
An Accounting System for Solid Waste Management in Small Communities.
ERIC Educational Resources Information Center
Zausner, Eric R.
This pamphlet provides a guide to the type and quantity of information to be collected for effective solid waste management in small communities. It is directed at municipal or private personnel involved in the operation and ownership of management facilities. Sample activity reports are included for reference. (CS)
DOT National Transportation Integrated Search
1974-08-01
Volume 2 contains the analysis and description of air traffic management activities at three levels of detail - functions, subfunctions, and tasks. A total of 265 tasks are identified and described, and the flow of information inputs and outputs amon...
A Top Level Analysis of Training Management Functions.
ERIC Educational Resources Information Center
Ackerson, Jack
1995-01-01
Discusses how to conduct a top-level analysis of training management functions to identify problems within a training system resulting from rapid growth, the acquisition of new departments, or mergers. The data gathering process and analyses are explained, training management functions and activities are described, and root causes and solutions…
The Chair's Role in College Enrollment Management: Matriculation of Students.
ERIC Educational Resources Information Center
Benson, Gordon L.
If educational institutions are to experience continued growth in times of declining enrollments, they must develop an organizational concept of enrollment management which incorporates all institutional areas in its activities. At the base of an effective enrollment management system is institutional research, which should focus on market…
DOT National Transportation Integrated Search
1974-08-01
Volume 2 contains the analysis and description of air traffic management activities at three levels of detail - functions, subfunctions, and tasks. A total of 265 tasks are identified and described, and the flow of information inputs and outputs amon...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and related multistate planning efforts; (3) Consider the concerns of Federal land management agencies.... (d) States may use any one or more of the management systems (in whole or in part) described in 23 CFR part 500. (e) States may apply asset management principles and techniques in establishing planning...
DOT National Transportation Integrated Search
1974-08-01
Volume 2 contains the analysis and description of air traffic management activities at three levels of detail - functions, subfunctions, and tasks. A total of 265 tasks are identified and described, and the flow of information inputs and outputs amon...
An Analysis of the Navy’s Selective Reenlistment Bonus (SRB) Management System and ROGER Model
2008-03-01
SRBMS Selective Reenlistment Bonus Management System STAR Selective Training and Reenlistment Program YOS Years of Service 4YO 4-Year Obligor 5YO...it includes 4-year obligors ( 4YO ) sailors who will reach the end of active obligated service (EAOS) during the fiscal year of the SRB program, as
A Clustering Methodology of Web Log Data for Learning Management Systems
ERIC Educational Resources Information Center
Valsamidis, Stavros; Kontogiannis, Sotirios; Kazanidis, Ioannis; Theodosiou, Theodosios; Karakos, Alexandros
2012-01-01
Learning Management Systems (LMS) collect large amounts of data. Data mining techniques can be applied to analyse their web data log files. The instructors may use this data for assessing and measuring their courses. In this respect, we have proposed a methodology for analysing LMS courses and students' activity. This methodology uses a Markov…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.
This document is part 2 of the workbook for kindergarten pupils in the Comprehensive Instructional Management System, a unified mathematics curriculum for kindergarten through grade 7. Each objective is developed by a variety of strategies, with mastery of objectives diagnosed through a testing component. The activities in the student workbook are…
ERIC Educational Resources Information Center
Scholtz, Sandra
A management information system (MIS) is applied to a medium sized general museum to reflect the actual curatorial/registration functions. The recordkeeping functions of loan and conservation activities are examined since they too can be effectively handled by computer and constitute a complementary data base to the accession/catalog information.…
A web-based biosignal data management system for U-health data integration.
Ro, Dongwoo; Yoo, Sooyoung; Choi, Jinwook
2008-11-06
In the ubiquitous healthcare environment, the biosignal data should be easily accessed and properly maintained. This paper describes a web-based data management system. It consists of a device interface, a data upload control, a central repository, and a web server. For the user-specific web services, a MFER Upload ActiveX Control was developed.
Students' Learning Behavior, Motivation and Critical Thinking in Learning Management Systems
ERIC Educational Resources Information Center
Wichadee, Saovapa
2014-01-01
Computer mediated communication (CMC) offers new opportunities for learners to create communities of inquiry that allow for more active learning. This paper reports on the use of a Learning Management System (LMS) as a tool to facilitate students' writing and critical thinking skills. The primary data for the study came from students'…
ERIC Educational Resources Information Center
Emelyanova, Natalya; Voronina, Elena
2014-01-01
Learning management systems (LMS) have been proven to encourage a constructive approach to knowledge acquisition and support active learning. One of the keys to successful and efficient use of LMS is how the stakeholders adopt and perceive this learning tool. The present research is therefore motivated by the importance of understanding teachers'…
2009-09-21
specified by contract no. W7714-040875/001/SV. This document contains the design of the JNDMS software to the system architecture level. Other...alternative for the presentation functions. ASP, Java, ActiveX , DLL, HTML, DHTML, SOAP, .NET HTML, DHTML, XML, Jscript, VBScript, SOAP, .NET...retrieved through the network, typically by a network management console. Information is contained in a Management Information Base (MIB), which is a data
ERIC Educational Resources Information Center
Pereira Querol, Marco A.; Suutari, Timo; Seppanen, Laura
2010-01-01
The purpose of this paper is to present theoretical tools for understanding the dynamics of change and learning during the emergence and development of environmental management activities. The methodology consists of a historical analysis of a case of biogas production that took place in the Southwest region of Finland. The theoretical tools used…
Detecting Vital Signs with Wearable Wireless Sensors
Yilmaz, Tuba; Foster, Robert; Hao, Yang
2010-01-01
The emergence of wireless technologies and advancements in on-body sensor design can enable change in the conventional health-care system, replacing it with wearable health-care systems, centred on the individual. Wearable monitoring systems can provide continuous physiological data, as well as better information regarding the general health of individuals. Thus, such vital-sign monitoring systems will reduce health-care costs by disease prevention and enhance the quality of life with disease management. In this paper, recent progress in non-invasive monitoring technologies for chronic disease management is reviewed. In particular, devices and techniques for monitoring blood pressure, blood glucose levels, cardiac activity and respiratory activity are discussed; in addition, on-body propagation issues for multiple sensors are presented. PMID:22163501
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROGRAM (CONTINUED) VOLUNTARY MEDICARE PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement... utilization management programs, quality assurance measures and systems, and medication therapy management... organization (QIO) activities. (f) Compliance deemed on the basis of accreditation. (g) Accreditation...
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROGRAM (CONTINUED) VOLUNTARY MEDICARE PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement... utilization management programs, quality assurance measures and systems, and medication therapy management... organization (QIO) activities. (f) Compliance deemed on the basis of accreditation. (g) Accreditation...
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAM VOLUNTARY MEDICARE PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement Requirements... utilization management programs, quality assurance measures and systems, and medication therapy management... organization (QIO) activities. (f) Compliance deemed on the basis of accreditation. (g) Accreditation...
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROGRAM (CONTINUED) VOLUNTARY MEDICARE PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement... utilization management programs, quality assurance measures and systems, and medication therapy management... organization (QIO) activities. (f) Compliance deemed on the basis of accreditation. (g) Accreditation...
77 FR 24955 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... care or strategic alignment of system changes with an organization's business strategy. System redesign... center leaders, clinical managers and staff involved in system redesign from each of the 8 participating...
Bringing the CMS distributed computing system into scalable operations
NASA Astrophysics Data System (ADS)
Belforte, S.; Fanfani, A.; Fisk, I.; Flix, J.; Hernández, J. M.; Kress, T.; Letts, J.; Magini, N.; Miccio, V.; Sciabà, A.
2010-04-01
Establishing efficient and scalable operations of the CMS distributed computing system critically relies on the proper integration, commissioning and scale testing of the data and workload management tools, the various computing workflows and the underlying computing infrastructure, located at more than 50 computing centres worldwide and interconnected by the Worldwide LHC Computing Grid. Computing challenges periodically undertaken by CMS in the past years with increasing scale and complexity have revealed the need for a sustained effort on computing integration and commissioning activities. The Processing and Data Access (PADA) Task Force was established at the beginning of 2008 within the CMS Computing Program with the mandate of validating the infrastructure for organized processing and user analysis including the sites and the workload and data management tools, validating the distributed production system by performing functionality, reliability and scale tests, helping sites to commission, configure and optimize the networking and storage through scale testing data transfers and data processing, and improving the efficiency of accessing data across the CMS computing system from global transfers to local access. This contribution reports on the tools and procedures developed by CMS for computing commissioning and scale testing as well as the improvements accomplished towards efficient, reliable and scalable computing operations. The activities include the development and operation of load generators for job submission and data transfers with the aim of stressing the experiment and Grid data management and workload management systems, site commissioning procedures and tools to monitor and improve site availability and reliability, as well as activities targeted to the commissioning of the distributed production, user analysis and monitoring systems.
An Assessment of Integrated Health Management (IHM) Frameworks
DOE Office of Scientific and Technical Information (OSTI.GOV)
N. Lybeck; M. Tawfik; L. Bond
In order to meet the ever increasing demand for energy, the United States nuclear industry is turning to life extension of existing nuclear power plants (NPPs). Economically ensuring the safe, secure, and reliable operation of aging nuclear power plants presents many challenges. The 2009 Light Water Reactor Sustainability Workshop identified online monitoring of active and structural components as essential to the better understanding and management of the challenges posed by aging nuclear power plants. Additionally, there is increasing adoption of condition-based maintenance (CBM) for active components in NPPs. These techniques provide a foundation upon which a variety of advanced onlinemore » surveillance, diagnostic, and prognostic techniques can be deployed to continuously monitor and assess the health of NPP systems and components. The next step in the development of advanced online monitoring is to move beyond CBM to estimating the remaining useful life of active components using prognostic tools. Deployment of prognostic health management (PHM) on the scale of a NPP requires the use of an integrated health management (IHM) framework - a software product (or suite of products) used to manage the necessary elements needed for a complete implementation of online monitoring and prognostics. This paper provides a thoughtful look at the desirable functions and features of IHM architectures. A full PHM system involves several modules, including data acquisition, system modeling, fault detection, fault diagnostics, system prognostics, and advisory generation (operations and maintenance planning). The standards applicable to PHM applications are indentified and summarized. A list of evaluation criteria for PHM software products, developed to ensure scalability of the toolset to an environment with the complexity of a NPP, is presented. Fourteen commercially available PHM software products are identified and classified into four groups: research tools, PHM system development tools, deployable architectures, and peripheral tools.« less
NASA Technical Reports Server (NTRS)
Labrune, Yves; Labbe, X.; Roussel, A.; Vielcanet, P.
1994-01-01
In the context of the CNES SPOT4 program CISI is particularly responsible for the development of the SPOT4 Management Centre, part of the SPOT4 ground control system located at CNES Toulouse (France) designed to provide simultaneous control over two satellites. The main operational activities are timed to synchronize with satellite visibilities (ten usable passes per day). The automatic capability of this system is achieved through agenda services (sequence of operations as defined and planned by operator). Therefore, the SPOT4 Management Centre offers limited, efficient and secure human interventions for supervision and decision making. This paper emphasizes the main system characteristics as degree of automation, level of dependability and system parameterization.
Automated plant, production management system
NASA Astrophysics Data System (ADS)
Aksenova, V. I.; Belov, V. I.
1984-12-01
The development of a complex of tasks for the operational management of production (OUP) within the framework of an automated system for production management (ASUP) shows that it is impossible to have effective computations without reliable initial information. The influence of many factors involving the production and economic activity of the entire enterprise upon the plan and course of production are considered. It is suggested that an adequate model should be available which covers all levels of the hierarchical system: workplace, section (bridgade), shop, enterprise, and the model should be incorporated into the technological sequence of performance and there should be provisions for an adequate man machine system.
Information for Successful Interaction with Autonomous Systems
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Johnson, Kathy A.
2003-01-01
Interaction in heterogeneous mission operations teams is not well matched to classical models of coordination with autonomous systems. We describe methods of loose coordination and information management in mission operations. We describe an information agent and information management tool suite for managing information from many sources, including autonomous agents. We present an integrated model of levels of complexity of agent and human behavior, which shows types of information processing and points of potential error in agent activities. We discuss the types of information needed for diagnosing problems and planning interactions with an autonomous system. We discuss types of coordination for which designs are needed for autonomous system functions.
Fuzzy energy management for hybrid fuel cell/battery systems for more electric aircraft
NASA Astrophysics Data System (ADS)
Corcau, Jenica-Ileana; Dinca, Liviu; Grigorie, Teodor Lucian; Tudosie, Alexandru-Nicolae
2017-06-01
In this paper is presented the simulation and analysis of a Fuzzy Energy Management for Hybrid Fuel cell/Battery Systems used for More Electric Aircraft. The fuel cell hybrid system contains of fuel cell, lithium-ion batteries along with associated dc to dc boost converters. In this configuration the battery has a dc to dc converter, because it is an active in the system. The energy management scheme includes the rule based fuzzy logic strategy. This scheme has a faster response to load change and is more robust to measurement imprecisions. Simulation will be provided using Matlab/Simulink based models. Simulation results are given to show the overall system performance.
A Web-based system for the intelligent management of diabetic patients.
Riva, A; Bellazzi, R; Stefanelli, M
1997-01-01
We describe the design and implementation of a distributed computer-based system for the management of insulin-dependent diabetes mellitus. The goal of the system is to support the normal activities of the physicians and patients involved in the care of diabetes by providing them with a set of automated services ranging from data collection and transmission to data analysis and decision support. The system is highly integrated with current practices in the management of diabetes, and it uses Internet technology to achieve high availability and ease of use. In particular, the user interaction takes place through dynamically generated World Wide Web pages, so that all the system's functions share an intuitive graphic user interface.
Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document
NASA Technical Reports Server (NTRS)
Carnell, Andrew; Akinyelu, Akinyele
2016-01-01
The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.
NASA Astrophysics Data System (ADS)
Calamaio, C. L.; Walker, J.; Beck, J. M.; Graves, S. J.; Johnson, C.
2017-12-01
Researchers at the Information Technology and Systems Center at the University of Alabama in Huntsville are working closely with the Madison County Emergency Management Agency (EMA), GeoHuntsville's UAS Working Group, and the NOAA UAS Program Office, to conduct a series of practical demonstrations testing the use of small unmanned aerial systems (sUAS) for emergency response activities in Madison County, Alabama. These exercises demonstrate the use of UAS to detect and visualize hazards in affected areas via the delivery of aerial imagery and associated data products to law enforcement first responders in a variety of different scenarios, for example, search and rescue, tornado track mapping, damage assessment, and situational awareness/containment during active shooter incidents. In addition to showcasing the use of UAS as a tool for emergency services, these pilot exercises provide the opportunity to engage the appropriate stakeholders from several communities including first responders, geospatial intelligence, active members of the unmanned systems industry, and academia. This presentation will showcase the challenges associated with delivering quality data products for emergency services in a timely manner as well as the related challenges in integrating the technology into local emergency management.
Calculating a checksum with inactive networking components in a computing system
Aho, Michael E; Chen, Dong; Eisley, Noel A; Gooding, Thomas M; Heidelberger, Philip; Tauferner, Andrew T
2014-12-16
Calculating a checksum utilizing inactive networking components in a computing system, including: identifying, by a checksum distribution manager, an inactive networking component, wherein the inactive networking component includes a checksum calculation engine for computing a checksum; sending, to the inactive networking component by the checksum distribution manager, metadata describing a block of data to be transmitted by an active networking component; calculating, by the inactive networking component, a checksum for the block of data; transmitting, to the checksum distribution manager from the inactive networking component, the checksum for the block of data; and sending, by the active networking component, a data communications message that includes the block of data and the checksum for the block of data.
Calculating a checksum with inactive networking components in a computing system
Aho, Michael E; Chen, Dong; Eisley, Noel A; Gooding, Thomas M; Heidelberger, Philip; Tauferner, Andrew T
2015-01-27
Calculating a checksum utilizing inactive networking components in a computing system, including: identifying, by a checksum distribution manager, an inactive networking component, wherein the inactive networking component includes a checksum calculation engine for computing a checksum; sending, to the inactive networking component by the checksum distribution manager, metadata describing a block of data to be transmitted by an active networking component; calculating, by the inactive networking component, a checksum for the block of data; transmitting, to the checksum distribution manager from the inactive networking component, the checksum for the block of data; and sending, by the active networking component, a data communications message that includes the block of data and the checksum for the block of data.
O'Brien, C; Cambouropoulos, P
2000-01-01
A six-month prospective study was conducted on the usefulness and usability of a representative electronic knowledge management tool, the WAX Active Library, for 19 general practitioners (GPs) evaluated using questionnaires and audit trail data. The number of pages accessed was highest in the final two months, when over half of the access trails were completed within 40 seconds. Most GPs rated the system as easy to learn, fast to use, and preferable to paper for providing information during consultations. Such tools could provide a medium for the activities of knowledge officers, help demand management, and promote sharing of information within primary care groups and across NHSnet or the Internet. PMID:10962792
Taylor, Erin Fries; Machta, Rachel M; Meyers, David S; Genevro, Janice; Peikes, Deborah N
2013-01-01
Efforts to redesign primary care require multiple supports. Two potential members of the primary care team-practice facilitator and care manager-can play important but distinct roles in redesigning and improving care delivery. Facilitators, also known as quality improvement coaches, assist practices with coordinating their quality improvement activities and help build capacity for those activities-reflecting a systems-level approach to improving quality, safety, and implementation of evidence-based practices. Care managers provide direct patient care by coordinating care and helping patients navigate the system, improving access for patients, and communicating across the care team. These complementary roles aim to help primary care practices deliver coordinated, accessible, comprehensive, and patient-centered care.
Agent-based power sharing scheme for active hybrid power sources
NASA Astrophysics Data System (ADS)
Jiang, Zhenhua
The active hybridization technique provides an effective approach to combining the best properties of a heterogeneous set of power sources to achieve higher energy density, power density and fuel efficiency. Active hybrid power sources can be used to power hybrid electric vehicles with selected combinations of internal combustion engines, fuel cells, batteries, and/or supercapacitors. They can be deployed in all-electric ships to build a distributed electric power system. They can also be used in a bulk power system to construct an autonomous distributed energy system. An important aspect in designing an active hybrid power source is to find a suitable control strategy that can manage the active power sharing and take advantage of the inherent scalability and robustness benefits of the hybrid system. This paper presents an agent-based power sharing scheme for active hybrid power sources. To demonstrate the effectiveness of the proposed agent-based power sharing scheme, simulation studies are performed for a hybrid power source that can be used in a solar car as the main propulsion power module. Simulation results clearly indicate that the agent-based control framework is effective to coordinate the various energy sources and manage the power/voltage profiles.
Group Policy Reference Systems and Network Attack Center (SNAC)
2001-03-02
Policy Snap-in for a given Active Directory container . It is hoped that this map will alleviate some of the complexity in managing and understanding...help the reader locate specific policies within the Group Policy Snap-in for a given Active Directory container . It is hoped that this map will alleviate...Policy Snap-in for a given Active Directory container . It is hoped that this map will alleviate some of the complexity in managing and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaelen, Gunter van; Verheyen, Annick
2007-07-01
The management of radioactive waste in Belgium is undertaken by the national agency for radioactive waste and enriched fissile materials, ONDRAF/NIRAS, and its industrial partner Belgoprocess. ONDRAF/NIRAS has set up a management system designed to guarantee that the general public and the environment are protected against the potential hazards arising from radioactive waste. Belgoprocess is a private company, founded in 1984 and located in Dessel, Belgium. It is a subsidiary of ONDRAF/NIRAS and its activities focus on the safe processing and storage of radioactive waste. The management system of ONDRAF/NIRAS includes two aspects: a) an integrated system and b) anmore » acceptance system. The integrated system covers all aspects of management ranging from the origin of waste to its transport, processing, interim storage and long-term management. The safety of radioactive waste management not only depends on the quality of the design and construction of the processing, temporary storage or disposal infrastructure, but also on the quality of the waste accepted by ONDRAF/NIRAS. In order to be manage d safely, both in the short and the long term, the waste transferred to ONDRAF/NIRAS must meet certain specific requirements. To that end, ONDRAF/NIRAS has developed an acceptance system. (authors)« less
CSHM: Web-based safety and health monitoring system for construction management.
Cheung, Sai On; Cheung, Kevin K W; Suen, Henry C H
2004-01-01
This paper describes a web-based system for monitoring and assessing construction safety and health performance, entitled the Construction Safety and Health Monitoring (CSHM) system. The design and development of CSHM is an integration of internet and database systems, with the intent to create a total automated safety and health management tool. A list of safety and health performance parameters was devised for the management of safety and health in construction. A conceptual framework of the four key components of CSHM is presented: (a) Web-based Interface (templates); (b) Knowledge Base; (c) Output Data; and (d) Benchmark Group. The combined effect of these components results in a system that enables speedy performance assessment of safety and health activities on construction sites. With the CSHM's built-in functions, important management decisions can theoretically be made and corrective actions can be taken before potential hazards turn into fatal or injurious occupational accidents. As such, the CSHM system will accelerate the monitoring and assessing of performance safety and health management tasks.
Integrating RFID technique to design mobile handheld inventory management system
NASA Astrophysics Data System (ADS)
Huang, Yo-Ping; Yen, Wei; Chen, Shih-Chung
2008-04-01
An RFID-based mobile handheld inventory management system is proposed in this paper. Differing from the manual inventory management method, the proposed system works on the personal digital assistant (PDA) with an RFID reader. The system identifies electronic tags on the properties and checks the property information in the back-end database server through a ubiquitous wireless network. The system also provides a set of functions to manage the back-end inventory database and assigns different levels of access privilege according to various user categories. In the back-end database server, to prevent improper or illegal accesses, the server not only stores the inventory database and user privilege information, but also keeps track of the user activities in the server including the login and logout time and location, the records of database accessing, and every modification of the tables. Some experimental results are presented to verify the applicability of the integrated RFID-based mobile handheld inventory management system.
MLCMS Actual Use, Perceived Use, and Experiences of Use
ERIC Educational Resources Information Center
Asiimwe, Edgar Napoleon; Grönlund, Åke
2015-01-01
Mobile learning involves use of mobile devices to participate in learning activities. Most e-learning activities are available to participants through learning systems such as learning content management systems (LCMS). Due to certain challenges, LCMS are not equally accessible on all mobile devices. This study investigates actual use, perceived…
40 CFR 503.24 - Management practices.
Code of Federal Regulations, 2011 CFR
2011-07-01
... event. (h) The leachate collection system for an active sewage sludge unit that has a liner and leachate... three years after the sewage sludge unit closes. (i) Leachate from an active sewage sludge unit that has a liner and leachate collection system shall be collected and shall be disposed in accordance with...
40 CFR 503.24 - Management practices.
Code of Federal Regulations, 2013 CFR
2013-07-01
... event. (h) The leachate collection system for an active sewage sludge unit that has a liner and leachate... three years after the sewage sludge unit closes. (i) Leachate from an active sewage sludge unit that has a liner and leachate collection system shall be collected and shall be disposed in accordance with...
40 CFR 503.24 - Management practices.
Code of Federal Regulations, 2014 CFR
2014-07-01
... event. (h) The leachate collection system for an active sewage sludge unit that has a liner and leachate... three years after the sewage sludge unit closes. (i) Leachate from an active sewage sludge unit that has a liner and leachate collection system shall be collected and shall be disposed in accordance with...
40 CFR 503.24 - Management practices.
Code of Federal Regulations, 2012 CFR
2012-07-01
... event. (h) The leachate collection system for an active sewage sludge unit that has a liner and leachate... three years after the sewage sludge unit closes. (i) Leachate from an active sewage sludge unit that has a liner and leachate collection system shall be collected and shall be disposed in accordance with...
48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...
48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...
48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...
48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...
48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...
48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-19
... the Electronic Application System for Indian Education (EASIE) AGENCY: Office of Elementary and... Electronic Application System for Indian Education (EASIE). OMB Control Number: 1810-0021. Type of Review: An... DEPARTMENT OF EDUCATION [Docket No. ED-2013-ICCD-0001] Agency Information Collection Activities...
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
Study on ecological conservation planning of Xianyue Park in Xiamen City, China
NASA Astrophysics Data System (ADS)
Xu, Naizhong; Xi, Rong; Ren, Tingyan; Zhao, Peng; Chuai, Zeyao
2017-08-01
The paper discusses the current situation and existing problems of ecological restoration and tourist infrastructure development of Xiamen Xianyue Park located in Xiamen Island, China. Issues of ecosystem restoration and landscape improvement, restoring habitats, and ecosystem management system are analyzed. Options of further optimization of the tourist-targeted infrastructure are proposed, which take into account the ecological system and landscape pattern optimization, promotion of ecotourism, and implementation of the ecological management system. The particular solution envisages the park zoning with three primary zones (ecological protection, ecological buffer, and general activity zones) and five secondary ones (scenic landscape, ecotourism, religious activity, buildings and structures, and entertainment zones). By integrating the ecological principles into other land use objectives, taking full advantage of the park ecological and cultural heritage, and improving its ecological management, it is expected to provide the ecological restoration of the park under study and optimize its contribution to the regional economic and social development.
Federal Nursing Service Award. Impact of TriCare/managed care on total force readiness.
Ray, M A; Turkel, M C
2001-04-01
Mission readiness is dependent on a healthy total force and the response of military medical and nursing services. Managed care has become the norm in U.S. health care, including the Department of Defense Military Health System. Cost management, health maintenance organizations, and other health plans are defined as "managed care," an aggressive cost-control effort by health care purchasers and insurers to limit health care spending and services and advance a market-oriented, profit-driven system. The impact of managed care on mission readiness and retention of active and reserve personnel is and will continue to be profound. The purpose of this research was to conduct a qualitative, phenomenological study (life experiences) of TriCare/managed care to explore the impact and the meaning of the experience on total force mission readiness of the U.S. Air Force and how managed care has changed nursing practice. The results reveal the significance of the impact of TriCare/managed care on total force readiness by identifying, through themes, meta-themes, and a representative model, the negative effect that economics is having on active duty and reserve force health and well-being.
Price Based Local Power Distribution Management System (Local Power Distribution Manager) v1.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
BROWN, RICHARD E.; CZARNECKI, STEPHEN; SPEARS, MICHAEL
2016-11-28
A trans-active energy micro-grid controller is implemented in the VOLTTRON distributed control platform. The system uses the price of electricity as the mechanism for conducting transactions that are used to manage energy use and to balance supply and demand. In order to allow testing and analysis of the control system, the implementation is designed to run completely as a software simulation, while allowing the inclusion of selected hardware that physically manages power. Equipment to be integrated with the micro-grid controller must have an IP (Internet Protocol)-based network connection and a software "driver" must exist to translate data communications between themore » device and the controller.« less
Energy Management of Smart Distribution Systems
NASA Astrophysics Data System (ADS)
Ansari, Bananeh
Electric power distribution systems interface the end-users of electricity with the power grid. Traditional distribution systems are operated in a centralized fashion with the distribution system owner or operator being the only decision maker. The management and control architecture of distribution systems needs to gradually transform to accommodate the emerging smart grid technologies, distributed energy resources, and active electricity end-users or prosumers. The content of this document concerns with developing multi-task multi-objective energy management schemes for: 1) commercial/large residential prosumers, and 2) distribution system operator of a smart distribution system. The first part of this document describes a method of distributed energy management of multiple commercial/ large residential prosumers. These prosumers not only consume electricity, but also generate electricity using their roof-top solar photovoltaics systems. When photovoltaics generation is larger than local consumption, excess electricity will be fed into the distribution system, creating a voltage rise along the feeder. Distribution system operator cannot tolerate a significant voltage rise. ES can help the prosumers manage their electricity exchanges with the distribution system such that minimal voltage fluctuation occurs. The proposed distributed energy management scheme sizes and schedules each prosumer's ES to reduce the electricity bill and mitigate voltage rise along the feeder. The second part of this document focuses on emergency energy management and resilience assessment of a distribution system. The developed emergency energy management system uses available resources and redundancy to restore the distribution system's functionality fully or partially. The success of the restoration maneuver depends on how resilient the distribution system is. Engineering resilience terminology is used to evaluate the resilience of distribution system. The proposed emergency energy management scheme together with resilience assessment increases the distribution system operator's preparedness for emergency events.
Information logistics: A production-line approach to information services
NASA Technical Reports Server (NTRS)
Adams, Dennis; Lee, Chee-Seng
1991-01-01
Logistics can be defined as the process of strategically managing the acquisition, movement, and storage of materials, parts, and finished inventory (and the related information flow) through the organization and its marketing channels in a cost effective manner. It is concerned with delivering the right product to the right customer in the right place at the right time. The logistics function is composed of inventory management, facilities management, communications unitization, transportation, materials management, and production scheduling. The relationship between logistics and information systems is clear. Systems such as Electronic Data Interchange (EDI), Point of Sale (POS) systems, and Just in Time (JIT) inventory management systems are important elements in the management of product development and delivery. With improved access to market demand figures, logisticians can decrease inventory sizes and better service customer demand. However, without accurate, timely information, little, if any, of this would be feasible in today's global markets. Information systems specialists can learn from logisticians. In a manner similar to logistics management, information logistics is concerned with the delivery of the right data, to the ring customer, at the right time. As such, information systems are integral components of the information logistics system charged with providing customers with accurate, timely, cost-effective, and useful information. Information logistics is a management style and is composed of elements similar to those associated with the traditional logistics activity: inventory management (data resource management), facilities management (distributed, centralized and decentralized information systems), communications (participative design and joint application development methodologies), unitization (input/output system design, i.e., packaging or formatting of the information), transportations (voice, data, image, and video communication systems), materials management (data acquisition, e.g., EDI, POS, external data bases, data entry) and production scheduling (job, staff, and project scheduling).
NASA Technical Reports Server (NTRS)
Lohr, Gary W.; Williams, Daniel M.
2008-01-01
Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.
Lindberg, Arley
2012-01-01
Federal welfare reform, local service collaborations, and the evolution of statewide information systems inspired agency interest in evidence-informed practice and knowledge sharing systems. Four agency leaders, including the Director, Deputy Director, Director of Planning and Evaluation, and Staff Development Program Manager championed the development of a learning organization based on knowledge management throughout the agency. Internal department restructuring helped to strengthen the Planning and Evaluation, Staff Development, and Personnel units, which have become central to supporting knowledge sharing activities. The Four Pillars of Knowledge framework was designed to capture agency directions in relationship to future knowledge management goals. Featuring People, Practice, Technology and Budget, the framework links the agency's services, mission and goals to the process of becoming a learning organization. Built through an iterative process, the framework was created by observing existing activities in each department rather than being designed from the top down. Knowledge management can help the department to fulfill its mission despite reduced resources. Copyright © Taylor & Francis Group, LLC
Martin-Clouaire, Roger; Rellier, Jean-Pierre; Paré, Nakié; Voltz, Marc; Biarnès, Anne
2016-01-01
Many farming-system studies have investigated the design and evaluation of crop-management practices with respect to economic performance and reduction in environmental impacts. In contrast, little research has been devoted to analysing these practices in terms of matching the recurrent context-dependent demand for resources (labour in particular) with those available on the farm. This paper presents Dhivine, a simulation model of operational management of grape production at the vineyard scale. Particular attention focuses on representing a flexible plan, which organises activities temporally, the resources available to the vineyard manager and the process of scheduling and executing the activities. The model relies on a generic production-system ontology used in several agricultural production domains. The types of investigations that the model supports are briefly illustrated. The enhanced realism of the production-management situations simulated makes it possible to examine and understand properties of resource-constrained work-organisation strategies and possibilities for improving them. PMID:26990089
NASA Technical Reports Server (NTRS)
Hirshorn, Steven R.
2017-01-01
Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.
Energy monitoring system based on human activity in the workplace
NASA Astrophysics Data System (ADS)
Mustafa, Nur Hanim; Husain, Mohd Nor; Aziz, Mohamad Zoinol Abidin Abdul; Othman, Mohd Azlishah; Malek, Fareq
2015-05-01
Human behaviors always related to day routine activities in a smart house directly give the significant factor to manage energy usage in human life. An Addition that, the factor will contribute to the best efficiency of the system. This paper will focus on the monitoring efficiency based on duration time in office hours around 8am until 5pm which depend on human behavior at working place. Besides that, the correlation coefficient method is used to show the relation between energy consumption and energy saving based on the total hours of time energy spent. In future, the percentages of energy monitoring system usage will be increase to manage energy saving based on human behaviors. This scenario will help to see the human activity in the workplace in order to get the energy saving and support world green environment.
Activity-based costing and its application in a Turkish university hospital.
Yereli, Ayşe Necef
2009-03-01
Resource management in hospitals is of increasing importance in today's global economy. Traditional accounting systems have become inadequate for managing hospital resources and accurately determining service costs. Conversely, the activity-based costing approach to hospital accounting is an effective cost management model that determines costs and evaluates financial performance across departments. Obtaining costs that are more accurate can enable hospitals to analyze and interpret costing decisions and make more accurate budgeting decisions. Traditional and activity-based costing approaches were compared using a cost analysis of gall bladder surgeries in the general surgery department of one university hospital in Manisa, Turkey. Copyright (c) AORN, Inc, 2009.
1992-12-01
rights or on management issues such as personnel and infrastructure investments are addresseud in the directive only at the broadest level, or in many...area with investments , including information systems. c. Functional processes improvements shall be accomplished though activity modeling and busi ass...an enterprise has invested considerable time, money and effort into the current system and has limited funds to upgrade the system (111:37). Software
Systematic analysis of EOS data system for operations
NASA Technical Reports Server (NTRS)
Moe, K. L.; Dasgupta, R.
1985-01-01
A data management analysis methodology is being proposed. The objective of the methodology is to assist mission managers by identifying a series of ordered activities to be systematically followed in order to arrive at an effective ground system design. Existing system engineering tools and concepts have been assembled into a structured framework to facilitate the work of a mission planner. It is intended that this methodology can be gainfully applied (with probable modifications and/or changes) to the EOS payloads and their associated data systems.
75 FR 25215 - Privacy Act of 1974; Systems of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... Management System Office, 1160 Defense Pentagon, Washington, DC 20301-1160. Instructions: All submissions... activity applications; accounts receivable records; loan information; dishonored check listings; and...
Optimizing cardiothoracic surgery information for a managed care environment.
Denton, T A; Matloff, J M
1995-11-01
The rapid change occurring in American healthcare is a direct response to rising costs. Managed care is the fastest growing model that attempts to control escalating costs through limitations in patient choice, the active use of guidelines, and placing providers at risk. Managed care is an information intensive system, and those providers who use information effectively will be at an advantage in the competitive healthcare marketplace. There are five classes of information that providers must collect to be competitive in a managed care environment: patient satisfaction, medical outcomes, continuous quality improvement, quality of the decision, and financial data. Each of these should be actively used in marketing, assuring the quality of patient care, and maintaining financial stability. Although changes in our healthcare system are occurring rapidly, we need to respond to the marketplace to maintain our viability, but as physicians, we have the singular obligation to maintain the supremacy of the individual patient and the physician-patient relationship.
Design of Knowledge Management System for Diabetic Complication Diseases
NASA Astrophysics Data System (ADS)
Fiarni, Cut
2017-01-01
This paper examines how to develop a Model for Knowledge Management System (KMS) for diabetes complication diseases. People with diabetes have a higher risk of developing a series of serious health problems. Each patient has different condition that could lead to different disease and health problem. But, with the right information, patient could have early detection so the health risk could be minimized and avoided. Hence, the objective of this research is to propose a conceptual framework that integrates social network model, Knowledge Management activities, and content based reasoning (CBR) for designing such a diabetes health and complication disease KMS. The framework indicates that the critical knowledge management activities are in the process to find similar case and the index table for algorithm to fit the framework for the social media. With this framework, KMS developers can work with healthcare provider to easily identify the suitable IT associated with the CBR process when developing a diabetes KMS.
Ontological Model of Business Process Management Systems
NASA Astrophysics Data System (ADS)
Manoilov, G.; Deliiska, B.
2008-10-01
The activities which constitute business process management (BPM) can be grouped into five categories: design, modeling, execution, monitoring and optimization. Dedicated software packets for business process management system (BPMS) are available on the market. But the efficiency of its exploitation depends on used ontological model in the development time and run time of the system. In the article an ontological model of BPMS in area of software industry is investigated. The model building is preceded by conceptualization of the domain and taxonomy of BPMS development. On the base of the taxonomy an simple online thesaurus is created.
Description of data base management systems activities
NASA Technical Reports Server (NTRS)
1983-01-01
One of the major responsibilities of the JPL Computing and Information Services Office is to develop and maintain a JPL plan for providing computing services to the JPL management and administrative community that will lead to improved productivity. The CISO plan to accomplish this objective has been titled 'Management and Administrative Support Systems' (MASS). The MASS plan is based on the continued use of JPL's IBM 3032 Computer system for administrative computing and for the MASS functions. The current candidate administrative Data Base Management Systems required to support the MASS include ADABASE, Cullinane IDMS and TOTAL. Previous uses of administrative Data Base Systems have been applied to specific local functions rather than in a centralized manner with elements common to the many user groups. Limited capacity data base systems have been installed in microprocessor based office automation systems in a few Project and Management Offices using Ashton-Tate dBASE II. These experiences plus some other localized in house DBMS uses have provided an excellent background for developing user and system requirements for a single DBMS to support the MASS program.
[Cost of therapy for neurodegenerative diseases. Applying an activity-based costing system].
Sánchez-Rebull, María-Victoria; Terceño Gómez, Antonio; Travé Bautista, Angeles
2013-01-01
To apply the activity based costing (ABC) model to calculate the cost of therapy for neurodegenerative disorders in order to improve hospital management and allocate resources more efficiently. We used the case study method in the Francolí long-term care day center. We applied all phases of an ABC system to quantify the cost of the activities developed in the center. We identified 60 activities; the information was collected in June 2009. The ABC system allowed us to calculate the average cost per patient with respect to the therapies received. The most costly and commonly applied technique was psycho-stimulation therapy. Focusing on this therapy and on others related to the admissions process could lead to significant cost savings. ABC costing is a viable method for costing activities and therapies in long-term day care centers because it can be adapted to their structure and standard practice. This type of costing allows the costs of each activity and therapy, or combination of therapies, to be determined and aids measures to improve management. Copyright © 2012 SESPAS. Published by Elsevier Espana. All rights reserved.
Hearns, S; Shirley, P J
2006-01-01
Retrieval and transfer of critically ill and injured patients is a high risk activity. Risk can be minimised with robust safety and clinical governance systems in place. This article describes the various governance systems that can be employed to optimise safety and efficiency in retrieval services. These include operating procedure development, equipment management, communications procedures, crew resource management, significant event analysis, audit and training. PMID:17130608
1980-02-01
automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined
Decision support system for drinking water management
NASA Astrophysics Data System (ADS)
Janža, M.
2012-04-01
The problems in drinking water management are complex and often solutions must be reached under strict time constrains. This is especially distinct in case of environmental accidents in the catchment areas of the wells that are used for drinking water supply. The beneficial tools that can help decision makers and make program of activities more efficient are decision support systems (DSS). In general they are defined as computer-based support systems that help decision makers utilize data and models to solve unstructured problems. The presented DSS was developed in the frame of INCOME project which is focused on the long-term stable and safe drinking water supply in Ljubljana. The two main water resources Ljubljana polje and Barje alluvial aquifers are characterized by a strong interconnection of surface and groundwater, high vulnerability, high velocities of groundwater flow and pollutant transport. In case of sudden pollution, reactions should be very fast to avoid serious impact to the water supply. In the area high pressures arising from urbanization, industry, traffic, agriculture and old environmental burdens. The aim of the developed DSS is to optimize the activities in cases of emergency water management and to optimize the administrative work regarding the activities that can improve groundwater quality status. The DSS is an interactive computer system that utilizes data base, hydrological modelling, and experts' and stakeholders' knowledge. It consists of three components, tackling the different abovementioned issues in water management. The first one utilizes the work on identification, cleaning up and restoration of illegal dumpsites that are a serious threat to the qualitative status of groundwater. The other two components utilize the predictive capability of the hydrological model and scenario analysis. The user interacts with the system by a graphical interface that guides the user step-by-step to the recommended remedial measures. Consequently, the acquisition of information to support the water management's decisions is simplified and faster, thus contributing to more efficient water management and a safer supply of drinking water.
ABC estimation of unit costs for emergency department services.
Holmes, R L; Schroeder, R E
1996-04-01
Rapid evolution of the health care industry forces managers to make cost-effective decisions. Typical hospital cost accounting systems do not provide emergency department managers with the information needed, but emergency department settings are so complex and dynamic as to make the more accurate activity-based costing (ABC) system prohibitively expensive. Through judicious use of the available traditional cost accounting information and simple computer spreadsheets. managers may approximate the decision-guiding information that would result from the much more costly and time-consuming implementation of ABC.
NASA Technical Reports Server (NTRS)
Bishop, Peter C.; Erickson, Lloyd
1990-01-01
The Management Information and Decision Support Environment (MIDSE) is a research activity to build and test a prototype of a generic human interface on the Johnson Space Center (JSC) Information Network (CIN). The existing interfaces were developed specifically to support operations rather than the type of data which management could use. The diversity of the many interfaces and their relative difficulty discouraged occasional users from attempting to use them for their purposes. The MIDSE activity approached this problem by designing and building an interface to one JSC data base - the personnel statistics tables of the NASA Personnel and Payroll System (NPPS). The interface was designed against the following requirements: generic (use with any relational NOMAD data base); easy to learn (intuitive operations for new users); easy to use (efficient operations for experienced users); self-documenting (help facility which informs users about the data base structure as well as the operation of the interface); and low maintenance (easy configuration to new applications). A prototype interface entitled the JSC Management Information Systems (JSCMIS) was produced. It resides on CIN/PROFS and is available to JSC management who request it. The interface has passed management review and is ready for early use. Three kinds of data are now available: personnel statistics, personnel register, and plan/actual cost.
Sensor management in RADAR/IRST track fusion
NASA Astrophysics Data System (ADS)
Hu, Shi-qiang; Jing, Zhong-liang
2004-07-01
In this paper, a novel radar management strategy technique suitable for RADAR/IRST track fusion, which is based on Fisher Information Matrix (FIM) and fuzzy stochastic decision approach, is put forward. Firstly, optimal radar measurements' scheduling is obtained by the method of maximizing determinant of the Fisher information matrix of radar and IRST measurements, which is managed by the expert system. Then, suggested a "pseudo sensor" to predict the possible target position using the polynomial method based on the radar and IRST measurements, using "pseudo sensor" model to estimate the target position even if the radar is turned off. At last, based on the tracking performance and the state of target maneuver, fuzzy stochastic decision is used to adjust the optimal radar scheduling and retrieve the module parameter of "pseudo sensor". The experiment result indicates that the algorithm can not only limit Radar activity effectively but also keep the tracking accuracy of active/passive system well. And this algorithm eliminates the drawback of traditional Radar management methods that the Radar activity is fixed and not easy to control and protect.
Integrating automated support for a software management cycle into the TAME system
NASA Technical Reports Server (NTRS)
Sunazuka, Toshihiko; Basili, Victor R.
1989-01-01
Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system.
A Smart Power Electronic Multiconverter for the Residential Sector.
Guerrero-Martinez, Miguel Angel; Milanes-Montero, Maria Isabel; Barrero-Gonzalez, Fermin; Miñambres-Marcos, Victor Manuel; Romero-Cadaval, Enrique; Gonzalez-Romera, Eva
2017-05-26
The future of the grid includes distributed generation and smart grid technologies. Demand Side Management (DSM) systems will also be essential to achieve a high level of reliability and robustness in power systems. To do that, expanding the Advanced Metering Infrastructure (AMI) and Energy Management Systems (EMS) are necessary. The trend direction is towards the creation of energy resource hubs, such as the smart community concept. This paper presents a smart multiconverter system for residential/housing sector with a Hybrid Energy Storage System (HESS) consisting of supercapacitor and battery, and with local photovoltaic (PV) energy source integration. The device works as a distributed energy unit located in each house of the community, receiving active power set-points provided by a smart community EMS. This central EMS is responsible for managing the active energy flows between the electricity grid, renewable energy sources, storage equipment and loads existing in the community. The proposed multiconverter is responsible for complying with the reference active power set-points with proper power quality; guaranteeing that the local PV modules operate with a Maximum Power Point Tracking (MPPT) algorithm; and extending the lifetime of the battery thanks to a cooperative operation of the HESS. A simulation model has been developed in order to show the detailed operation of the system. Finally, a prototype of the multiconverter platform has been implemented and some experimental tests have been carried out to validate it.