Science.gov

Sample records for activity schedule milestones

  1. AVLIS production plant project schedule and milestones

    SciTech Connect

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  2. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  3. From theory to practice: making entrustable professional activities come to life in the context of milestones.

    PubMed

    Englander, Robert; Carraccio, Carol

    2014-10-01

    Entrustable professional activities (EPAs) are gaining traction across the globe as a practical way to teach and assess competencies in the clinical setting. Full-scale implementation, though, has only taken place in obstetrics-gynecology in the Netherlands and in psychiatry in Australia and New Zealand. As with any conceptual framework, implementation in different contexts will require adaptations. For example, implementation in the United States will need to incorporate the Accreditation Council for Graduate Medical Education's competencies and the recently completed milestones for each of the specialties. In this issue, an article by Aylward and colleagues describes the process for implementing a handoff communication EPA, using milestones as the basis for the assessment tool. The explicit linkage of the milestones with the EPA assessment allows a more definitive "picture" of the learner to emerge at each advancing level of performance of the EPA. This "picture" can be shared with those directly observing the learner and thus provides a potential model for a more reliable assessment of learners performing EPAs and perhaps a more consistent approach to entrustment decisions. The authors hope that Aylward and colleagues' article will be one of many that aim to help the medical education community understand how to implement EPAs as a framework for competency demonstration, as educators try to determine what works, under what conditions and in what settings. Only through a committed effort to share lessons learned can the promise of the theory be translated to practice in the field. PMID:24892405

  4. Automated Scheduling of Science Activities for Titan Encounters by Cassini

    NASA Technical Reports Server (NTRS)

    Ray, Trina L.; Knight, Russel L.; Mohr, Dave

    2014-01-01

    In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

  5. Exact milestoning

    SciTech Connect

    Bello-Rivas, Juan M.; Elber, Ron

    2015-03-07

    A new theory and an exact computer algorithm for calculating kinetics and thermodynamic properties of a particle system are described. The algorithm avoids trapping in metastable states, which are typical challenges for Molecular Dynamics (MD) simulations on rough energy landscapes. It is based on the division of the full space into Voronoi cells. Prior knowledge or coarse sampling of space points provides the centers of the Voronoi cells. Short time trajectories are computed between the boundaries of the cells that we call milestones and are used to determine fluxes at the milestones. The flux function, an essential component of the new theory, provides a complete description of the statistical mechanics of the system at the resolution of the milestones. We illustrate the accuracy and efficiency of the exact Milestoning approach by comparing numerical results obtained on a model system using exact Milestoning with the results of long trajectories and with a solution of the corresponding Fokker-Planck equation. The theory uses an equation that resembles the approximate Milestoning method that was introduced in 2004 [A. K. Faradjian and R. Elber, J. Chem. Phys. 120(23), 10880-10889 (2004)]. However, the current formulation is exact and is still significantly more efficient than straightforward MD simulations on the system studied.

  6. Exact milestoning

    PubMed Central

    Bello-Rivas, Juan M.; Elber, Ron

    2015-01-01

    A new theory and an exact computer algorithm for calculating kinetics and thermodynamic properties of a particle system are described. The algorithm avoids trapping in metastable states, which are typical challenges for Molecular Dynamics (MD) simulations on rough energy landscapes. It is based on the division of the full space into Voronoi cells. Prior knowledge or coarse sampling of space points provides the centers of the Voronoi cells. Short time trajectories are computed between the boundaries of the cells that we call milestones and are used to determine fluxes at the milestones. The flux function, an essential component of the new theory, provides a complete description of the statistical mechanics of the system at the resolution of the milestones. We illustrate the accuracy and efficiency of the exact Milestoning approach by comparing numerical results obtained on a model system using exact Milestoning with the results of long trajectories and with a solution of the corresponding Fokker-Planck equation. The theory uses an equation that resembles the approximate Milestoning method that was introduced in 2004 [A. K. Faradjian and R. Elber, J. Chem. Phys. 120(23), 10880-10889 (2004)]. However, the current formulation is exact and is still significantly more efficient than straightforward MD simulations on the system studied. PMID:25747056

  7. Exact milestoning.

    PubMed

    Bello-Rivas, Juan M; Elber, Ron

    2015-03-01

    A new theory and an exact computer algorithm for calculating kinetics and thermodynamic properties of a particle system are described. The algorithm avoids trapping in metastable states, which are typical challenges for Molecular Dynamics (MD) simulations on rough energy landscapes. It is based on the division of the full space into Voronoi cells. Prior knowledge or coarse sampling of space points provides the centers of the Voronoi cells. Short time trajectories are computed between the boundaries of the cells that we call milestones and are used to determine fluxes at the milestones. The flux function, an essential component of the new theory, provides a complete description of the statistical mechanics of the system at the resolution of the milestones. We illustrate the accuracy and efficiency of the exact Milestoning approach by comparing numerical results obtained on a model system using exact Milestoning with the results of long trajectories and with a solution of the corresponding Fokker-Planck equation. The theory uses an equation that resembles the approximate Milestoning method that was introduced in 2004 [A. K. Faradjian and R. Elber, J. Chem. Phys. 120(23), 10880-10889 (2004)]. However, the current formulation is exact and is still significantly more efficient than straightforward MD simulations on the system studied. PMID:25747056

  8. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  9. Driving Care Quality: Aligning Trainee Assessment and Supervision Through Practical Application of Entrustable Professional Activities, Competencies, and Milestones.

    PubMed

    Carraccio, Carol; Englander, Robert; Holmboe, Eric S; Kogan, Jennifer R

    2016-02-01

    To address the long-standing challenge of meaningful trainee assessment, the authors reviewed and expanded on the Accountable Assessment for Quality Care and Supervision (AAQCS) equation. The equation proposes that care quality is the product of the interaction between trainee performance (measured by workplace assessment) and supervision (required level of intervention to ensure care quality) in the context of the environment where the care occurs: Trainee performance × Appropriate supervision = Safe, effective patient-centered care. Assessing trainee performance and matching that performance to "appropriate" supervision, however, is fraught with challenges. The authors suggest a unifying framework that integrates entrustable professional activities (EPAs), competencies, and milestones to inform trainee assessment and supervision, thereby enabling the practical application of the AAQCS equation in the workplace. Because the unit of measure for an EPA is the outcome of whether the trainee can safely and effectively perform the professional activity without supervision, the proposed unifying framework directly aligns with the dependent variable in the AAQCS equation: care quality.The value of applying a unifying framework that integrates EPAs, competencies, and milestones to the AAQCS equation in the clinical learning environment lies in its ability to provide supervisors with a shared mental model of performance expectations for trainees, reducing unwanted variability and improving assessment accuracy; guidance for aligning performance milestones of trainees with the needed level of supervisor intervention to ensure care quality; and substrate for specific feedback to improve the trainee's professional development as a way to ensure future care quality. PMID:26509601

  10. Implementation of nephrology subspecialty curricular milestones.

    PubMed

    Yuan, Christina M; Prince, Lisa K; Oliver, James D; Abbott, Kevin C; Nee, Robert

    2015-07-01

    Beginning in the 2014-2015 training year, the US Accreditation Council for Graduate Medical Education (ACGME) required that nephrology Clinical Competency Committees assess fellows' progress toward 23 subcompetency "context nonspecific" internal medicine subspecialty milestones. Fellows' advancement toward the "ready for unsupervised practice" target milestone now is tracked in each of the 6 competencies: Patient Care, Medical Knowledge, Professionalism, Interpersonal Communication Skills, Practice-Based Learning and Improvement, and Systems-Based Practice. Nephrology program directors and subspecialty societies must define nephrology-specific "curricular milestones," mapped to the nonspecific ACGME milestones. Although the ACGME goal is to produce data that can discriminate between successful and underperforming training programs, the approach is at risk to produce biased, inaccurate, and unhelpful information. We map the ACGME internal medicine subspecialty milestones to our previously published nephrology-specific milestone schema and describe entrustable professional activities and other objective assessment tools that inform milestone decisions. Mapping our schema onto the ACGME subspecialty milestone reporting form allows comparison with the ACGME subspecialty milestones and the curricular milestones developed by the American Society of Nephrology Program Directors. Clinical Competency Committees may easily adapt and directly translate milestone decisions reached using our schema onto the ACGME internal medicine subspecialty competency milestone-reporting format. PMID:25773484

  11. Focus of attention in an activity-based scheduler

    NASA Technical Reports Server (NTRS)

    Sadeh, Norman; Fox, Mark S.

    1989-01-01

    Earlier research in job shop scheduling has demonstrated the advantages of opportunistically combining order-based and resource-based scheduling techniques. An even more flexible approach is investigated where each activity is considered a decision point by itself. Heuristics to opportunistically select the next decision point on which to focus attention (i.e., variable ordering heuristics) and the next decision to be tried at this point (i.e., value ordering heuristics) are described that probabilistically account for both activity precedence and resource requirement interactions. Preliminary experimental results indicate that the variable ordering heuristic greatly increases search efficiency. While least constraining value ordering heuristics have been advocated in the literature, the experimental results suggest that other value ordering heuristics combined with our variable-ordering heuristic can produce much better schedules without significantly increasing search.

  12. Entrustable professional activities and curricular milestones for fellowship training in pulmonary and critical care medicine: report of a multisociety working group.

    PubMed

    Fessler, Henry E; Addrizzo-Harris, Doreen; Beck, James M; Buckley, John D; Pastores, Stephen M; Piquette, Craig A; Rowley, James A; Spevetz, Antoinette

    2014-09-01

    This article describes the curricular milestones and entrustable professional activities for trainees in pulmonary, critical care, or combined fellowship programs. Under the Next Accreditation System of the Accreditation Council for Graduate Medical Education (ACGME), curricular milestones compose the curriculum or learning objectives for training in these fields. Entrustable professional activities represent the outcomes of training, the activities that society and professional peers can expect fellowship graduates to be able to perform unsupervised. These curricular milestones and entrustable professional activities are the products of a consensus process from a multidisciplinary committee of medical educators representing the American College of Chest Physicians (CHEST), the American Thoracic Society, the Society of Critical Care Medicine, and the Association of Pulmonary and Critical Care Medicine Program Directors. After consensus was achieved using the Delphi process, the document was revised with input from the sponsoring societies and program directors. The resulting lists can serve as a roadmap and destination for trainees, program directors, and educators. Together with the reporting milestones, they will help mark trainees' progress in the mastery of the six ACGME core competencies of graduate medical education. PMID:24945874

  13. Preemie Milestones

    MedlinePlus

    ... should be doing at this age. At 2 Months (8 Weeks) Motor Moves hands and legs actively ... interactions with mother or primary caregiver At 4 Months (16 Weeks) Motor Brings hands together, or to ...

  14. Developmental milestones record - 3 years

    MedlinePlus

    Normal childhood growth milestones - 3 years; Growth milestones for children - 3 years; Childhood growth milestones - 3 years ... provider. Physical and motor milestones for a typical 3-year-old include: Gains about 4 - 5 pounds ...

  15. Developmental milestones record - 9 months

    MedlinePlus

    Growth milestones for children - 9 months; Childhood growth milestones - 9 months; Normal childhood growth milestones - 9 months ... provider. PHYSICAL CHARACTERISTICS AND MOTOR SKILLS A 9-month-old has usually reached the following milestones: Gains ...

  16. Entrustable professional activities and curricular milestones for fellowship training in pulmonary and critical care medicine: executive summary from the Multi-Society Working Group.

    PubMed

    Fessler, Henry E; Addrizzo-Harris, Doreen; Beck, James M; Buckley, John D; Pastores, Stephen M; Piquette, Craig A; Rowley, James A; Spevetz, Antoinette

    2014-10-01

    Assessment of graduate medical trainee progress via the accomplishment of competency milestones is an important element of the Next Accreditation System of the Accreditation Council for Graduate Medical Education. This article summarizes the findings of a multisociety working group that was tasked with creating the entrustable professional activities and curricular milestones for fellowship training in pulmonary medicine, critical care medicine, and combined programs. Using the Delphi process, experienced medical educators from the American College of Chest Physicians, American Thoracic Society, Society of Critical Care Medicine, and Association of Pulmonary and Critical Care Medicine Program Directors reached consensus on the detailed curricular content and expected skill set of graduates of these programs. These are now available to trainees and program directors for the purposes of curriculum design, review, and trainee assessment. PMID:25226119

  17. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  18. Yucca Mountain Milestone

    SciTech Connect

    Hunt, Rod

    1997-06-09

    The Department of Energy project to determine if the Yucca Mountain site in Nevada is suitable for geologic disposal of high-level nuclear waste reached a major milestone in late April when a 25-foot-diameter tunnel boring machine ``holed through'' completing a five-mile-long, horseshoe-shaped excavation through the mountain. When the cutting-head of the giant machine broke through to daylight at the tunnel's south portal, it ended a 2 1/2-year excavation through the mountain that was completed ahead of schedule and with an outstanding safety record. Video of the event was transmitted live by satellite to Washington, DC, where it was watched by Secretary of Energy Frederico Pena and other high-level DOE officials, signifying the importance of the project's mission to find a repository for high-level nuclear waste and spent nuclear fuel produced by nuclear power plants. This critical undertaking is being performed by DOE's Office of Civilian Radioactive Waste Management (OCRWM). The tunnel is the major feature of the Exploratory Studies Facility (ESF), which serves as an underground laboratory for engineers and scientists to help determine if Yucca Mountain is suitable to serve as a repository for the safe disposal of high-level nuclear waste. Morrison Knudsen's Environmental/Government Group is providing design and construction-management services on the project. The MK team is performing final design for the ESF and viability assessment design for the underground waste repository that will be built only if the site is found suitable for such a mission. In fact, if at anytime during the ESF phase, the site is found unsuitable, the studies will be stopped and the site restored to its natural state.

  19. Developmental milestones record - 9 months

    MedlinePlus

    Growth milestones for children - 9 months; Childhood growth milestones - 9 months; Normal childhood growth milestones - 9 months ... pushed to encourage walking. Sing songs together. Avoid television time until age 2. Try using a transition ...

  20. Developmental milestones record - 2 years

    MedlinePlus

    Growth milestones for children - 2 years; Normal childhood growth milestones - 2 years; Childhood growth milestones - 2 years ... a cause for concern if not seen by 2 years.) Can run with better coordination . (May still ...

  1. Developmental milestones record - 12 months

    MedlinePlus

    Normal childhood growth milestones - 12 months; Growth milestones for children - 12 months; Childhood growth milestones - 12 months ... care provider. PHYSICAL AND MOTOR SKILLS A 12-month-old child is expected to: Be 3 times ...

  2. Developmental milestones record - 18 months

    MedlinePlus

    Growth milestones for children - 18 months; Normal childhood growth milestones - 18 months; Childhood growth milestones - 18 months ... PHYSICAL AND MOTOR SKILL MARKERS The typical 18-month-old: Has a closed soft spot on the ...

  3. Developmental milestones record - 4 months

    MedlinePlus

    Normal childhood growth milestones - 4 months; Childhood growth milestones - 4 months; Growth milestones for children - 4 months ... provider. PHYSICAL AND MOTOR SKILLS The typical 4-month-old baby should: Slow in weight gain to ...

  4. Developmental milestones record - 6 months

    MedlinePlus

    Normal childhood growth milestones - 6 months; Childhood growth milestones - 6 months; Growth milestones for children - 6 months ... the weight on hands (often occurs by 4 months) Able to pick up a dropped object Able ...

  5. Developmental milestones record - 2 years

    MedlinePlus

    Growth milestones for children - 2 years; Normal childhood growth milestones - 2 years; Childhood growth milestones - 2 years ... cause for concern if not seen by 2 years.) Can run with better coordination. (May still have ...

  6. Developmental milestones record - 4 years

    MedlinePlus

    Normal childhood growth milestones - 4 years; Growth milestones for children - 4 years; Childhood growth milestones - 4 years ... care provider. PHYSICAL AND MOTOR During the fourth year, a child typically: Gains weight at the rate ...

  7. Optimal stimulus scheduling for active estimation of evoked brain networks

    NASA Astrophysics Data System (ADS)

    Kafashan, MohammadMehdi; Ching, ShiNung

    2015-12-01

    Objective. We consider the problem of optimal probing to learn connections in an evoked dynamic network. Such a network, in which each edge measures an input-output relationship between sites in sensor/actuator-space, is relevant to emerging applications in neural mapping and neural connectivity estimation. Approach. We show that the problem of scheduling nodes to a probe (i.e., stimulate) amounts to a problem of optimal sensor scheduling. Main results. By formulating the evoked network in state-space, we show that the solution to the greedy probing strategy has a convenient form and, under certain conditions, is optimal over a finite horizon. We adopt an expectation maximization technique to update the state-space parameters in an online fashion and demonstrate the efficacy of the overall approach in a series of detailed numerical examples. Significance. The proposed method provides a principled means to actively probe time-varying connections in neuronal networks. The overall method can be implemented in real time and is particularly well-suited to applications in stimulation-based cortical mapping in which the underlying network dynamics are changing over time.

  8. A suggested emergency medicine boot camp curriculum for medical students based on the mapping of Core Entrustable Professional Activities to Emergency Medicine Level 1 milestones

    PubMed Central

    Lamba, Sangeeta; Wilson, Bryan; Natal, Brenda; Nagurka, Roxanne; Anana, Michael; Sule, Harsh

    2016-01-01

    Background An increasing number of students rank Emergency Medicine (EM) as a top specialty choice, requiring medical schools to provide adequate exposure to EM. The Core Entrustable Professional Activities (EPAs) for Entering Residency by the Association of American Medical Colleges combined with the Milestone Project for EM residency training has attempted to standardize the undergraduate and graduate medical education goals. However, it remains unclear as to how the EPAs correlate to the milestones, and who owns the process of ensuring that an entering EM resident has competency at a certain minimum level. Recent trends establishing specialty-specific boot camps prepare students for residency and address the variability of skills of students coming from different medical schools. Objective Our project’s goal was therefore to perform a needs assessment to inform the design of an EM boot camp curriculum. Toward this goal, we 1) mapped the core EPAs for graduating medical students to the EM residency Level 1 milestones in order to identify the possible gaps/needs and 2) conducted a pilot procedure workshop that was designed to address some of the identified gaps/needs in procedural skills. Methods In order to inform the curriculum of an EM boot camp, we used a systematic approach to 1) identify gaps between the EPAs and EM milestones (Level 1) and 2) determine what essential and supplemental competencies/skills an incoming EM resident should ideally possess. We then piloted a 1-day, three-station advanced ABCs procedure workshop based on the identified needs. A pre-workshop test and survey assessed knowledge, preparedness, confidence, and perceived competence. A post-workshop survey evaluated the program, and a posttest combined with psychomotor skills test using three simulation cases assessed students’ skills. Results Students (n=9) reported increased confidence in the following procedures: intubation (1.5–2.1), thoracostomy (1.1–1.9), and central venous

  9. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of work. As prescribed in 48 CFR 1371.104, insert the following clause. Schedule of Work (APR 2010... shall identify the critical path. The Work Package Network shall show the work items, milestones, key events, and activities and shall clearly identify the critical path. The Total Manpower Loading...

  10. Developmental milestones record

    MedlinePlus

    ... in the early years is to follow your child's development. Most parents also watch for different milestones. Talk ... child's provider if you have concerns about your child's development. Closely watching a "checklist" or calendar of developmental ...

  11. Milestones in Rotorcraft Aeromechanics

    NASA Technical Reports Server (NTRS)

    Johnson, Wayne

    2011-01-01

    The subject of this paper is milestones in rotorcraft aeromechanics. Aeromechanics covers much of what the engineer needs: performance, loads, vibration, stability, flight dynamics, noise. These topics cover many of the key performance attributes, and many of the often-encountered problems in rotorcraft designs. A milestone is a critical achievement, a turning point, an event marking a significant change or stage in development. The milestones identified and discussed include the beginnings of aeromechanics with autogyro analysis, ground resonance, aeromechanics books, unsteady aerodynamics and airloads, nonuniform inflow and wakes, beams and dynamics, comprehensive analysis, computational fluid dynamics, and rotor airloads tests. The focus on milestones limits the scope of the history, but allows the author to acknowledge his choices for key steps in the development of the science and engineering of rotorcraft.

  12. Found in transition: applying milestones to three unique discharge curricula.

    PubMed

    Meade, Lauren B; Todd, Christine Y; Walsh, Meghan M

    2015-01-01

    Introduction. A safe and effective transition from hospital to post-acute care is a complex and important physician competency. Milestones and Entrustable Professional Activities (EPA) form the new educational rubric in Graduate Medical Education Training. "A safe and effective discharge from the hospital" is an EPA ripe for educational innovation. Methods. The authors collaborated in a qualitative process called mapping to define 22 of 142 Internal Medicine (IM) curricular milestones related to the transition of care. Fifty-five participant units at an Association for Program Directors in Internal Medicine (APDIM) workshop prioritized the milestones, using a validated ranking process called Q-sort. We analyzed the Q-sort results, which rank the milestones in order of priority. We then applied this ranking to three innovative models of training IM residents in the transitions of care: Simulation (S), Discharge Clinic Feedback (DCF) and TRACER (T). Results. We collected 55 Q-sort rankings from particpants at the APDIM workshop. We then identified which milestones are a focus of the three innovative models of training in the transition of care: Simulation = 5 of 22 milestones, Discharge Clinic Feedback = 9 of 22 milestones, and TRACER = 7 of 22 milestones. Milestones identified in each innovation related to one of the top 8 prioritized milestones 75% of the time; thus, more frequently than the milestones with lower priority. Two milestones are shared by all three curricula: Utilize patient-centered education and Ensure succinct written communication. Two other milestones are shared by two curricula: Manage and coordinate care transitions across multiple delivery systems and Customize care in the context of the patient's preferences. If you combine the three innovations, all of the top 8 milestones are included. Discussion. The milestones give us a context to share individual innovations and to compare and contrast using a standardized frame. We demonstrate that the

  13. Genetic Counseling Milestones: A Framework for Student Competency Evaluation.

    PubMed

    Guy, Carrie

    2016-08-01

    Graduate medical education has recently increased focus on the development of medical specialty competency milestones to provide a targeted tool for medical resident evaluation. Milestones provide developmental assessment of the attainment of competencies over the course of an educational program. An educational framework is described to explore the development of Genetic Counseling Milestones for the evaluation of the development of genetic counseling competencies by genetic counseling students. The development of Genetic Counseling Milestones may provide a valuable tool to assess genetic counseling students across all program activities. Historical educational context, current practices, and potential benefits and challenges in the development of Genetic Counseling Milestones are discussed. PMID:26462934

  14. Using joint activity schedules to promote peer engagement in preschoolers with autism.

    PubMed

    Betz, Alison; Higbee, Thomas S; Reagon, Kara A

    2008-01-01

    We assessed the use of a joint activity schedule to increase peer engagement for preschoolers with autism. We taught 3 dyads of preschoolers with autism to follow joint activity schedules that cued both members of the pair to play a sequence of interactive games together. Results indicated that joint activity schedules increased peer engagement and the number of games completed for all dyads. Schedule following was maintained without additional prompting when activities were resequenced and when new games were introduced for 2 of the 3 dyads. PMID:18595287

  15. Activity Schedules, Computer Technology, and Teaching Children with Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Stromer, Robert; Kimball, Jonathan W.; Kinney, Elisabeth M.; Taylor, Bridget A.

    2006-01-01

    A review of selected literature suggests that integrating multimedia computer supports with activity schedules can be an effective way to teach students to manage their work, play, and skill-building activities independently. Activity schedules originally were a means of promoting independent execution of previously learned responses by using…

  16. Picture Activity Schedules and Engagement of Adults with Mental Retardation in a Group Home.

    ERIC Educational Resources Information Center

    Anderson, Michele D.; Sherman, James A.; Sheldon, Jan B.; McAdam, David

    1997-01-01

    A study involving three adults with mental retardation found engagement in typical adult activities was greater when picture schedules were provided. The schedules provided a reminder for the adults and teaching counselors, provided an easy reference to assist them in determining the next activity, and reduced transition time between activities.…

  17. FY11 Level-2 Milestone 3953: TLCC2 contract awarded

    SciTech Connect

    Carnes, B

    2011-09-12

    This report documents completion of FY11 L2 milestone No.3953-TLCC2 contract award. This milestone was scheduled for completion on 3/31/11 and was completed on 4/14/11. There is a separate milestone (3856), due at the end of the fiscal year, concerned with installation of the first LLNL SU and early user access. Efforts related to this tri-lab L2 milestone started early in 2010 with the development of tri-lab requirements for the second ASC capacity system procurement. The SOW was then developed along with necessary RFP paperwork and sent to HQ/DOE for their review prior to being released. There was significant delay in getting this step completed which led to this milestone being put at risk for several months. However, once the RFP was approved and released we were able to get the procurement back on track with aggressive proposal response and review timelines.

  18. Thermal constraints on activity scheduling and habitat choice in baboons.

    PubMed

    Hill, Russell A

    2006-02-01

    The importance of thermoregulation as a constraint on behavior has received comparatively little attention in relation to other ecological factors. Despite this, a number of studies suggested that high temperature may represent an important ecological constraint. This paper examines the impact of temperature on activity scheduling in a troop of chacma baboons (Papio hamadryas ursinus) at De Hoop Nature Reserve, South Africa. Once the daily, seasonal, and individual effects were controlled for, the "perceived environmental temperature" (PET), which accounts for the relative contributions of solar radiation, wind speed, and humidity on shade temperature, was a significant constraint on behavior. With high PET, feeding declines, and there is an increase in grooming and particularly resting behavior. Baboons thus engage in more sedentary behaviors as temperature increases, with significantly higher levels of resting and grooming when temperature exceeds the approximate thermal neutral zone for baboons. Seeking shade is an important behavioral response to thermal stress, and PET was a significant determinant of whether an animal was in shade while engaged in either resting or grooming behavior. Furthermore, the proportion of time spent in shade increased across air temperatures that were below, within, and above the thermal neutral zone for baboons. Finally, since resting and grooming are conducted preferentially in certain habitat types, thermoregulatory considerations also impact on patterns of habitat choice and day-journey routes. This suggests that the thermal environment is an ecological variable that should be given greater consideration in future studies of primate behavior. PMID:16323181

  19. Establishing Derived Textual Control in Activity Schedules with Children with Autism

    ERIC Educational Resources Information Center

    Miguel, Caio F.; Yang, Heejean G.; Finn, Heather E.; Ahearn, William H.

    2009-01-01

    Activity schedules are often used to facilitate task engagement and transition for children with autism. This study evaluated whether conditional discrimination training would serve to transfer the control from activity-schedule pictures to printed words (i.e., derived textual control). Two preschoolers with autism were taught to select pictures…

  20. Use of Activity Schedule to Promote Independent Performance of Individuals with Autism and Other Intellectual Disabilities: A Review

    ERIC Educational Resources Information Center

    Koyama, Takanori; Wang, Hui-Ting

    2011-01-01

    A literature review was conducted on the effectiveness of activity schedules. Twenty three studies that a) were peer-reviewed, b) were experimental, c) implemented activity schedule as a primary intervention, d) incorporated multiple activities, and e) aimed to teach learners to self-manage individual schedules were included in the review. The…

  1. The Use of Linked Activity Schedules to Teach Children with Autism to Play Hide-and-Seek

    ERIC Educational Resources Information Center

    Brodhead, Matthew T.; Higbee, Thomas S.; Pollard, Joy S.; Akers, Jessica S.; Gerencser, Kristina R.

    2014-01-01

    Linked activity schedules were used to establish appropriate game play in children with autism during a game of hide-and-seek. All 6 participants demonstrated acquisition of appropriate play skills in the presence of the activity schedules and maintained responding during subsequent phases. When the schedules were removed, responding decreased to…

  2. Active Solution Space and Search on Job-shop Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Watanabe, Masato; Ida, Kenichi; Gen, Mitsuo

    In this paper we propose a new searching method of Genetic Algorithm for Job-shop scheduling problem (JSP). The coding method that represent job number in order to decide a priority to arrange a job to Gannt Chart (called the ordinal representation with a priority) in JSP, an active schedule is created by using left shift. We define an active solution at first. It is solution which can create an active schedule without using left shift, and set of its defined an active solution space. Next, we propose an algorithm named Genetic Algorithm with active solution space search (GA-asol) which can create an active solution while solution is evaluated, in order to search the active solution space effectively. We applied it for some benchmark problems to compare with other method. The experimental results show good performance.

  3. Incorporating Active Runway Crossings in Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2010-01-01

    A mixed integer linear program is presented for deterministically scheduling departure and ar rival aircraft at airport runways. This method addresses different schemes of managing the departure queuing area by treating it as first-in-first-out queues or as a simple par king area where any available aircraft can take-off ir respective of its relative sequence with others. In addition, this method explicitly considers separation criteria between successive aircraft and also incorporates an optional prioritization scheme using time windows. Multiple objectives pertaining to throughput and system delay are used independently. Results indicate improvement over a basic first-come-first-serve rule in both system delay and throughput. Minimizing system delay results in small deviations from optimal throughput, whereas minimizing throughput results in large deviations in system delay. Enhancements for computational efficiency are also presented in the form of reformulating certain constraints and defining additional inequalities for better bounds.

  4. Increasing Completion of Classroom Routines through the Use of Picture Activity Schedules

    ERIC Educational Resources Information Center

    Watson, Kamille J.; DiCarlo, Cynthia F.

    2016-01-01

    Teachers spend the first few days of school teaching routines to children that will help transitions in the classroom between different activities. When children have difficulty, they move more slowly and/or require teacher prompting. A picture activity schedule intervention (Breitfelder in Teach Except Child Plus 4(5):2-15, 2008; Bryan and Gast…

  5. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  6. XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL

    NASA Technical Reports Server (NTRS)

    Mulnix, C. L.

    1994-01-01

    XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has

  7. Milestones in ataxia

    PubMed Central

    Klockgether, Thomas; Paulson, Henry

    2010-01-01

    The past 25 years have seen enormous progress in the deciphering of the genetic and molecular basis of ataxias resulting in an improved understanding of their pathogenesis. The most significant milestones during this period were the cloning of the genes associated with the common spinocerebellar ataxias (SCAs), ataxia telangiectasia (AT) and Friedreich ataxia (FRDA). To date, the causative mutations of more than 30 SCAs and 20 recessive ataxias have been identified. In addition, there are numerous acquired ataxias with defined molecular causes so that the entire number of distinct ataxia disorders exceeds 50 and possibly approaches 100. Despite this enormous heterogeneity, a few recurrent pathopyhsiological themes stand out. These include protein aggregation, failure of protein homoestasis, perturbations in ion channel function, defects in DNA repair and mitochondrial dysfunction. The clinical phenotypes of the most common ataxia disorders have been firmly established, and their natural history is being studied in ongoing large observational trials. Effective therapies for ataxias are still lacking. However, novel drug targets are under investigation, and it is expected that there will be an increasing number of therapeutic trials in ataxia. PMID:21626557

  8. Milestones in Electron Crystallography

    PubMed Central

    Renault, Ludovic; Chou, Hui-Ting; Chiu, Po-Lin; Hill, Rena M.; Zeng, Xiangyan; Gipson, Bryant; Zhang, Zi Yan; Cheng, Anchi; Unger, Vinzenz; Stahlberg, Henning

    2007-01-01

    Summary Electron crystallography determines the structure of membrane embedded proteins in the two-dimensionally crystallized state by cryo-transmission electron microscopy imaging and computer structure reconstruction. Milestones on the path to the structure are high-level expression, purification of functional protein, reconstitution into two-dimensional lipid membrane crystals, high-resolution imaging, and structure determination by computer image processing. Here we review the current state of these methods. We also created an Internet information exchange platform for electron crystallography, where guidelines for the imaging and data processing method are maintained. The server (http://2dx.org) provides the electron crystallography community with a central information exchange platform, which is structured in blog and Wiki form, allowing visitors to add comments or discussions. It currently offers a detailed step-by-step introduction to image processing with the MRC software program. The server is also a repository for the 2dx software package, a user-friendly image processing system for 2D membrane protein crystals. PMID:17103018

  9. Effects of cocaine on locomotor activity and schedule-controlled behaviors of inbred rat strains.

    PubMed

    Witkin, J M; Goldberg, S R

    1990-10-01

    Effects of cocaine on several behaviors considered to be reflective of psychomotor stimulation were compared in F344/CR1BR and NBR/NIH inbred rat strains. Effects of cocaine on locomotor activity were compared with effects on either bar-press or nose-poke responses maintained under a multiple fixed-interval 3-min, timeout 1-min schedule of food presentation. In locomotor activity experiments, NBR rats were twice as active as F344 rats under baseline conditions and displayed dose-dependent increases in locomotion (5-20 mg/kg). Maximal increases in locomotor activity of F344 rats were only 200% compared to 1000% in NBR rats. In contrast to locomotor activity, no strain differences in the effects of cocaine were observed under the schedules of food delivery. Bar-pressing under the fixed-interval schedule was increased to a maximum of 150% of control in both rat strains. Nose-poke responding under the fixed-interval schedule was not significantly increased, but timeout rates were increased in both strains. These results suggest that NBR and F344 rats do not differ in general sensitivity to stimulant effects of cocaine but exhibit marked differences in responsivity to cocaine that are dependent upon the behavior studied. Further delineation of the behavioral specificity of strain differences in sensitivity to cocaine should help to identify neurobiological substrates underlying unique biologically determined responses to cocaine. PMID:2080195

  10. A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

    NASA Technical Reports Server (NTRS)

    Potter, William; Gasch, John; Bauer, Cynthia

    1998-01-01

    Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule

  11. Developmental milestones record - 5 years

    MedlinePlus

    ... milestones for children - 5 years References Feigelman S. The preschool years. In: Kliegman RM, Behrman RE, Jenson HB, ... Duplication for commercial use must be authorized in writing by ADAM Health Solutions. About MedlinePlus Site Map ...

  12. Developmental Milestones of Early Literacy

    MedlinePlus

    ... developmental milestones of early literacy. Younger Than 6 Months: Never Too Young Unlike solid foods , it is ... counts, so have fun with it! 6–12 Months: Developing a Taste for Books Whatever babies are ...

  13. Evaluating Visual Activity Schedules as Evidence-Based Practice for Individuals with Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Knight, Victoria; Sartini, Emily; Spriggs, Amy D.

    2015-01-01

    A comprehensive review of the literature was conducted for articles published between 1993 and 2013 to evaluate the quality of the Visual Activity Schedules (VAS) literature using current evidence-based criteria developed by Horner et al. (Except Child 71:165-179, 2005). Authors sought to determine whether VAS can be considered an evidence-based…

  14. Intermittent Metronomic Drug Schedule Is Essential for Activating Antitumor Innate Immunity and Tumor Xenograft Regression12

    PubMed Central

    Chen, Chong-Sheng; Doloff, Joshua C; Waxman, David J

    2014-01-01

    Metronomic chemotherapy using cyclophosphamide (CPA) is widely associated with antiangiogenesis; however, recent studies implicate other immune-based mechanisms, including antitumor innate immunity, which can induce major tumor regression in implanted brain tumor models. This study demonstrates the critical importance of drug schedule: CPA induced a potent antitumor innate immune response and tumor regression when administered intermittently on a 6-day repeating metronomic schedule but not with the same total exposure to activated CPA administered on an every 3-day schedule or using a daily oral regimen that serves as the basis for many clinical trials of metronomic chemotherapy. Notably, the more frequent metronomic CPA schedules abrogated the antitumor innate immune and therapeutic responses. Further, the innate immune response and antitumor activity both displayed an unusually steep dose-response curve and were not accompanied by antiangiogenesis. The strong recruitment of innate immune cells by the 6-day repeating CPA schedule was not sustained, and tumor regression was abolished, by a moderate (25%) reduction in CPA dose. Moreover, an ∼20% increase in CPA dose eliminated the partial tumor regression and weak innate immune cell recruitment seen in a subset of the every 6-day treated tumors. Thus, metronomic drug treatment must be at a sufficiently high dose but also sufficiently well spaced in time to induce strong sustained antitumor immune cell recruitment. Many current clinical metronomic chemotherapeutic protocols employ oral daily low-dose schedules that do not meet these requirements, suggesting that they may benefit from optimization designed to maximize antitumor immune responses. PMID:24563621

  15. Level-1 Milestone 350 Definitions v1

    SciTech Connect

    Quinn, T

    2006-11-17

    This milestone is the direct result of work that started seven years ago with the planning for a 100-teraFLOP platform and will be satisfied when 100 teraFLOPS is placed in operation and readied for Stockpile Stewardship Program simulations. The end product of this milestone will be a production-level, high-performance computing system, code named Purple, designed to be used to solve the most demanding stockpile stewardship problems, that is, the large-scale application problems at the edge of our understanding of weapon physics. This fully functional 100 teraFLOPS system must be able to serve a diverse scientific and engineering workload. It must also have a robust code development and production environment, both of which facilitate the workload requirements. This multi-year effort includes major activities in contract management, facilities, infrastructure, system software, and user environment and support. Led by LLNL, the trilabs defined the statement of work for a 100-teraFLOP system that resulted in a contract with IBM known as the Purple contract. LLNL worked with IBM throughout the contract period to resolve issues and collaborated with the Program to resolve contractual issues to ensure delivery of a platform that best serves the Program for a reasonable cost. The Purple system represents a substantial increase in the classified compute resources at LLNL for NNSA. The center computer environment must be designed to accept the Purple system and to scale with the increase of compute resources to achieve required end-to-end services. Networking, archival storage, visualization servers, global file systems, and system software will all be enhanced to support Purple's size and architecture. IBM and LLNL are sharing responsibility for Purple's system software. LLNL is responsible for the scheduler, resource manager, and some code development tools. Through the Purple contract, IBM is responsible for the remainder of the system software including the operating

  16. Effects of Activity Schedules on Challenging Behavior Exhibited in Children with Autism Spectrum Disorders: A Systematic Review

    ERIC Educational Resources Information Center

    Lequia, Jenna; Machalicek, Wendy; Rispoli, Mandy J.

    2012-01-01

    We reviewed studies implementing activity schedules to decrease challenging behavior of children with autism spectrum disorders (ASD). Systematic searches of electronic databases, journals, and reference lists identified 18 studies meeting the inclusion criteria. These studies were evaluated in terms of the effectiveness of activity schedules to…

  17. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  18. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  19. HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

    NASA Technical Reports Server (NTRS)

    Hua, Hook; Mrozinski, Joseph J.; Elfes, Alberto; Adumitroaie, Virgil; Shelton, Kacie E.; Smith, Jeffrey H.; Lincoln, William P.; Weisbin, Charles R.

    2012-01-01

    HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

  20. An Optimal CDS Construction Algorithm with Activity Scheduling in Ad Hoc Networks.

    PubMed

    Penumalli, Chakradhar; Palanichamy, Yogesh

    2015-01-01

    A new energy efficient optimal Connected Dominating Set (CDS) algorithm with activity scheduling for mobile ad hoc networks (MANETs) is proposed. This algorithm achieves energy efficiency by minimizing the Broadcast Storm Problem [BSP] and at the same time considering the node's remaining energy. The Connected Dominating Set is widely used as a virtual backbone or spine in mobile ad hoc networks [MANETs] or Wireless Sensor Networks [WSN]. The CDS of a graph representing a network has a significant impact on an efficient design of routing protocol in wireless networks. Here the CDS is a distributed algorithm with activity scheduling based on unit disk graph [UDG]. The node's mobility and residual energy (RE) are considered as parameters in the construction of stable optimal energy efficient CDS. The performance is evaluated at various node densities, various transmission ranges, and mobility rates. The theoretical analysis and simulation results of this algorithm are also presented which yield better results. PMID:26221627

  1. An Optimal CDS Construction Algorithm with Activity Scheduling in Ad Hoc Networks

    PubMed Central

    Penumalli, Chakradhar; Palanichamy, Yogesh

    2015-01-01

    A new energy efficient optimal Connected Dominating Set (CDS) algorithm with activity scheduling for mobile ad hoc networks (MANETs) is proposed. This algorithm achieves energy efficiency by minimizing the Broadcast Storm Problem [BSP] and at the same time considering the node's remaining energy. The Connected Dominating Set is widely used as a virtual backbone or spine in mobile ad hoc networks [MANETs] or Wireless Sensor Networks [WSN]. The CDS of a graph representing a network has a significant impact on an efficient design of routing protocol in wireless networks. Here the CDS is a distributed algorithm with activity scheduling based on unit disk graph [UDG]. The node's mobility and residual energy (RE) are considered as parameters in the construction of stable optimal energy efficient CDS. The performance is evaluated at various node densities, various transmission ranges, and mobility rates. The theoretical analysis and simulation results of this algorithm are also presented which yield better results. PMID:26221627

  2. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks

    SciTech Connect

    Douglas, D.G.; Maresca, J.W. Jr. )

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC).

  3. OPPS - OEL PROJECT PLANNER/SCHEDULER

    NASA Technical Reports Server (NTRS)

    Murphy, S. C.

    1994-01-01

    OPPS is a window-based graphics tool that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays a full image of the schedule being edited. The canvas contains a header area (for text) and a schedule area (for plotting graphic representations of milestone objects in a flexible timeline). The OPPS tool is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal Year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided. A milestone schedule can be saved to an ASCII file on another computer to be read by OPPS. The program can also print a schedule to a PostScript file. This program is not intended to replace a commercial scheduling/project management program. It does not provide the capability for defining dependencies between activities; dates must be provided manually. However, because OPPS has an ASCII file interface it can be used in conjunction with a project

  4. Shortening the Miles to the Milestones: Connecting EPA-Based Evaluations to ACGME Milestone Reports for Internal Medicine Residency Programs.

    PubMed

    Choe, John H; Knight, Christopher L; Stiling, Rebekah; Corning, Kelli; Lock, Keli; Steinberg, Kenneth P

    2016-07-01

    The Next Accreditation System requires internal medicine training programs to provide the Accreditation Council for Graduate Medical Education (ACGME) with semiannual information about each resident's progress in 22 subcompetency domains. Evaluation of resident "trustworthiness" in performing entrustable professional activities (EPAs) may offer a more tangible assessment construct than evaluations based on expectations of usual progression toward competence. However, translating results from EPA-based evaluations into ACGME milestone progress reports has proven to be challenging because the constructs that underlay these two systems differ.The authors describe a process to bridge the gap between rotation-specific EPA-based evaluations and ACGME milestone reporting. Developed at the University of Washington in 2012 and 2013, this method involves mapping EPA-based evaluation responses to "milestone elements," the narrative descriptions within the columns of each of the 22 internal medicine subcompetencies. As faculty members complete EPA-based evaluations, the mapped milestone elements are automatically marked as "confirmed." Programs can maintain a database that tallies the number of times each milestone element is confirmed for a resident; these data can be used to produce graphical displays of resident progress along the internal medicine milestones.Using this count of milestone elements allows programs to bridge the gap between faculty assessments of residents based on rotation-specific observed activities and semiannual ACGME reports based on the internal medicine milestones. Although potentially useful for all programs, this method is especially beneficial to large programs where clinical competency committee members may not have the opportunity for direct observation of all residents. PMID:27028030

  5. Speech and Language Developmental Milestones

    MedlinePlus

    ... What are the milestones for speech and language development? The first signs of communication occur when an infant learns that a cry will bring food, comfort, and companionship. Newborns also begin to recognize important sounds in their environment, such as the voice of their mother or ...

  6. 25 Legal and Legislative Milestones

    ERIC Educational Resources Information Center

    Diverse: Issues in Higher Education, 2009

    2009-01-01

    This timeline reflects some of the most significant legal and legislative milestones that have influenced higher education over the 25 years that "Diverse: Issues in Higher Education," formerly "Black Issues in Higher Education," has been in print. The legal battles have primarily involved the settlement of desegregation cases and the use of race…

  7. Developmental milestones record - 5 years

    MedlinePlus

    ... Stays balanced while standing on one foot with eyes closed Shows more skill with simple tools and writing utensils Can copy a triangle Can use a knife to spread soft foods Sensory and mental milestones: Has a vocabulary of more than 2,000 words Speaks in ...

  8. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to...

  9. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to...

  10. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to...

  11. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to...

  12. 15 CFR 712.1 - Round to zero rule that applies to activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.1 Round to...

  13. Early Language Milestones and Specific Language Impairment

    ERIC Educational Resources Information Center

    Rudolph, Johanna M.; Leonard, Laurence B.

    2016-01-01

    Delayed appearance of early language milestones can be one of the first signs of a developmental disorder. In this study, we investigated how well late acquisition of language milestones predicted an outcome of specific language impairment (SLI). The sample included 150 children (76 SLI), aged 4 to 7 years old. Milestone information was collected…

  14. September 2014 Milestone Report

    SciTech Connect

    Britton, Jr, Charles L.; Shelton, Jacob H.; Ericson, Milton Nance; Bobrek, Miljko; Blalock, Benjamin

    2014-10-01

    This is a report of the activities involving Task 2 of the NEET 2 project Radiation Hardened Circuitry Using Mask-Programmable Analog Arrays [1]. Using the analog blocks available in our currently pre-configured Via-Configured Array (VCA), we will perform a detailed schematic design of our system to include the signal-processing blocks for temperature, radiation and pressure. Control and data acquisition will be implemented with the Spartan-6 Field-Programmable Gate Array (FPGA) as well as wired serial communications with a remote computer to be used with this project. In addition, batteries and associated voltage regulators will be selected for powering the system. Fabrication may include a polyimide, printed circuit board (PCB) for improved radiation and temperature tolerance. The PCB will go through a layout process by one of the organizations we utilize for this function and be fabricated by another external vendor. Population of the system board will be performed using one of our in-house technicians or an outside vendor we commonly use. Five prototype systems (sensors, electronics board, battery power supply, and personal computer (PC) serial communications port) will be constructed to support the testing objectives of this work. Quality assurance will be performed at each step by both the submitters and the vendors.

  15. Flexible Scheduling.

    ERIC Educational Resources Information Center

    Davis, Harold S.; Bechard, Joseph E.

    A flexible schedule allows teachers to change group size, group composition, and class length according to the purpose of the lesson. This pamphlet presents various "master" schedules for flexible scheduling: (1) Simple block schedules, (2) back-to-back schedules, (3) interdisciplinary schedules, (4) school-wide block schedules, (5) open-lab…

  16. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  17. Milestones

    NASA Astrophysics Data System (ADS)

    2014-09-01

    Tami Bond, environmental engineer and professor in the Department of Civil and Environmental Engineering at the University of Illinois at Urbana-Champaign, has been selected as a 2014 MacArthur Fellow.

  18. Predicting scheduling success

    NASA Technical Reports Server (NTRS)

    Messing, Fredric

    1993-01-01

    This paper provides an analytical formulation to predict scheduling success for a class of problems frequently referred to as activity scheduling. Space Network communications scheduling is an example of activity scheduling. The principal assumption is that the activity start times are randomly distributed over the available time in the time line. The formulation makes it possible to estimate how much of the demand can be scheduled as a function of the demand, number of resources, activity duration, and activity flexibility. The paper includes computed results for a variety of resource and demand conditions. The results demonstrate that even with highly flexible activities, it is difficult to schedule demand greater than 60 percent of resources without the use of optimization and conflict resolution capabilities in the scheduling system.

  19. Cosmological milestones and energy conditions

    NASA Astrophysics Data System (ADS)

    Cattoën, C.; Visser, M.

    2007-05-01

    Until recently, the physically relevant singularities occurring in FRW cosmologies had traditionally been thought to be limited to the big bang, and possibly a big crunch. However, over the last few years, the zoo of cosmological singularities considered in the literature has become considerably more extensive, with big rips and sudden singularities added to the mix, as well as renewed interest in non-singular cosmological events such as bounces and turnarounds. In this talk, we present an extensive catalogue of such cosmological milestones, both at the kinematical and dynamical level. First, using generalized power series, purely kinematical definitions of these cosmological events are provided in terms of the behaviour of the scale factor a(t). The notion of a scale-factor singularity is defined, and its relation to curvature singularities (polynomial and differential) is explored. Second, dynamical information is extracted by using the Friedmann equations (without assuming even the existence of any equation of state) to place constraints on whether or not the classical energy conditions are satisfied at the cosmological milestones. Since the classification is extremely general, and modulo certain technical assumptions complete, the corresponding results are to a high degree model-independent.

  20. The MILE Guide: Milestones for Improving Learning & Education

    ERIC Educational Resources Information Center

    Partnership for 21st Century Skills, 2009

    2009-01-01

    Every district will benefit from understanding where it sits on the continuum of 21st century skills integration. The Milestones for Improving Learning & Education (MILE) Guide Self-Assessment tool helps districts accomplish this essential first step, covering the primary responsibilities and activities within a district. Subjects covered include:…

  1. Scheduled Daily Mating Induces Circadian Anticipatory Activity Rhythms in the Male Rat

    PubMed Central

    Landry, Glenn J.; Opiol, Hanna; Marchant, Elliott G.; Pavlovski, Ilya; Mear, Rhiannon J.; Hamson, Dwayne K.; Mistlberger, Ralph E.

    2012-01-01

    Daily schedules of limited access to food, palatable high calorie snacks, water and salt can induce circadian rhythms of anticipatory locomotor activity in rats and mice. All of these stimuli are rewarding, but whether anticipation can be induced by neural correlates of reward independent of metabolic perturbations associated with manipulations of food and hydration is unclear. Three experiments were conducted to determine whether mating, a non-ingestive behavior that is potently rewarding, can induce circadian anticipatory activity rhythms in male rats provided scheduled daily access to steroid-primed estrous female rats. In Experiment 1, rats anticipated access to estrous females in the mid-light period, but also exhibited post-coital eating and running. In Experiment 2, post-coital eating and running were prevented and only a minority of rats exhibited anticipation. Rats allowed to see and smell estrous females showed no anticipation. In both experiments, all rats exhibited sustained behavioral arousal and multiple mounts and intromissions during every session, but ejaculated only every 2–3 days. In Experiment 3, the rats were given more time with individual females, late at night for 28 days, and then in the midday for 28 days. Ejaculation rates increased and anticipation was robust to night sessions and significant although weaker to day sessions. The anticipation rhythm persisted during 3 days of constant dark without mating. During anticipation of nocturnal mating, the rats exhibited a significant preference for a tube to the mating cage over a tube to a locked cage with mating cage litter. This apparent place preference was absent during anticipation of midday mating, which may reflect a daily rhythm of sexual reward. The results establish mating as a reward stimulus capable of inducing circadian rhythms of anticipatory behavior in the male rat, and reveal a critical role for ejaculation, a modulatory role for time of day, and a potential confound role

  2. Scheduled daily mating induces circadian anticipatory activity rhythms in the male rat.

    PubMed

    Landry, Glenn J; Opiol, Hanna; Marchant, Elliott G; Pavlovski, Ilya; Mear, Rhiannon J; Hamson, Dwayne K; Mistlberger, Ralph E

    2012-01-01

    Daily schedules of limited access to food, palatable high calorie snacks, water and salt can induce circadian rhythms of anticipatory locomotor activity in rats and mice. All of these stimuli are rewarding, but whether anticipation can be induced by neural correlates of reward independent of metabolic perturbations associated with manipulations of food and hydration is unclear. Three experiments were conducted to determine whether mating, a non-ingestive behavior that is potently rewarding, can induce circadian anticipatory activity rhythms in male rats provided scheduled daily access to steroid-primed estrous female rats. In Experiment 1, rats anticipated access to estrous females in the mid-light period, but also exhibited post-coital eating and running. In Experiment 2, post-coital eating and running were prevented and only a minority of rats exhibited anticipation. Rats allowed to see and smell estrous females showed no anticipation. In both experiments, all rats exhibited sustained behavioral arousal and multiple mounts and intromissions during every session, but ejaculated only every 2-3 days. In Experiment 3, the rats were given more time with individual females, late at night for 28 days, and then in the midday for 28 days. Ejaculation rates increased and anticipation was robust to night sessions and significant although weaker to day sessions. The anticipation rhythm persisted during 3 days of constant dark without mating. During anticipation of nocturnal mating, the rats exhibited a significant preference for a tube to the mating cage over a tube to a locked cage with mating cage litter. This apparent place preference was absent during anticipation of midday mating, which may reflect a daily rhythm of sexual reward. The results establish mating as a reward stimulus capable of inducing circadian rhythms of anticipatory behavior in the male rat, and reveal a critical role for ejaculation, a modulatory role for time of day, and a potential confound role for

  3. Pu-238 fuel form activities, January 1-31, 1983

    SciTech Connect

    Not Available

    1983-03-01

    This monthly report for /sup 238/Pu Fuel Form Activities has two main sections: SRP-PuFF facility and SRL Fuel Form Activities. The program status, budget information, and milestone schedules are discussed in each main section. The Work Breakdown Structure (WBS) for this program is shown. Only one monthly report per year is processed for EDB.

  4. Pu-238 fuel form activities, January 1-31, 1981

    SciTech Connect

    Not Available

    1981-02-01

    This monthly report for /sup 238/Pu Fuel Form Activities has two main sections: SRP-PuFF facility and SRL Fuel Form Activities. The program status, budget information, and milestone schedules are discussed in each main section. The Work Breakdown Structure (WBS) for this program is shown. Only one monthly report per year is processed for EDB.

  5. Pu-238 fuel form activities, January 1-31, 1982

    SciTech Connect

    Not Available

    1982-03-01

    This monthly report for /sup 238/Pu fuel form activities has two main sections: SRP-PuFF facility and SRL fuel form activities. The program status, budget information, and milestone schedules are discussed in each main section. The Work Breakdown Structure (WBS) for this program is shown. Only one monthly report per year is processed for EDB.

  6. Caste-specific visual adaptations to distinct daily activity schedules in Australian Myrmecia ants.

    PubMed

    Narendra, Ajay; Reid, Samuel F; Greiner, Birgit; Peters, Richard A; Hemmi, Jan M; Ribi, Willi A; Zeil, Jochen

    2011-04-22

    Animals are active at different times of the day and their activity schedules are shaped by competition, time-limited food resources and predators. Different temporal niches provide different light conditions, which affect the quality of visual information available to animals, in particular for navigation. We analysed caste-specific differences in compound eyes and ocelli in four congeneric sympatric species of Myrmecia ants, with emphasis on within-species adaptive flexibility and daily activity rhythms. Each caste has its own lifestyle: workers are exclusively pedestrian; alate females lead a brief life on the wing before becoming pedestrian; alate males lead a life exclusively on the wing. While workers of the four species range from diurnal, diurnal-crepuscular, crepuscular-nocturnal to nocturnal, the activity times of conspecific alates do not match in all cases. Even within a single species, we found eye area, facet numbers, facet sizes, rhabdom diameters and ocelli size to be tuned to the distinct temporal niche each caste occupies. We discuss these visual adaptations in relation to ambient light levels, visual tasks and mode of locomotion. PMID:20926444

  7. Caste-specific visual adaptations to distinct daily activity schedules in Australian Myrmecia ants

    PubMed Central

    Narendra, Ajay; Reid, Samuel F.; Greiner, Birgit; Peters, Richard A.; Hemmi, Jan M.; Ribi, Willi A.; Zeil, Jochen

    2011-01-01

    Animals are active at different times of the day and their activity schedules are shaped by competition, time-limited food resources and predators. Different temporal niches provide different light conditions, which affect the quality of visual information available to animals, in particular for navigation. We analysed caste-specific differences in compound eyes and ocelli in four congeneric sympatric species of Myrmecia ants, with emphasis on within-species adaptive flexibility and daily activity rhythms. Each caste has its own lifestyle: workers are exclusively pedestrian; alate females lead a brief life on the wing before becoming pedestrian; alate males lead a life exclusively on the wing. While workers of the four species range from diurnal, diurnal-crepuscular, crepuscular-nocturnal to nocturnal, the activity times of conspecific alates do not match in all cases. Even within a single species, we found eye area, facet numbers, facet sizes, rhabdom diameters and ocelli size to be tuned to the distinct temporal niche each caste occupies. We discuss these visual adaptations in relation to ambient light levels, visual tasks and mode of locomotion. PMID:20926444

  8. Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

    NASA Technical Reports Server (NTRS)

    Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John

    1994-01-01

    The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications

  9. The Over-Scheduling Hypothesis Revisited: Intensity of Organized Activity Participation during Adolescence and Young Adult Outcomes

    ERIC Educational Resources Information Center

    Mahoney, Joseph L.; Vest, Andrea E.

    2012-01-01

    Concern exists that youth who spend a lot of time participating in organized out-of-school activities (e.g., sports) are at-risk for poor developmental outcomes. This concern--called the over-scheduling hypothesis--has primarily been assessed in terms of adolescent adjustment. This longitudinal study of a nationally representative sample of 1,115…

  10. Completion of Level 4 Milestone M4AT-15OR2301039 for the Johnson Noise Thermometry for Drift-free Temperature Measurements Work Package AT-15OR230103

    SciTech Connect

    Britton Jr, Charles L.

    2015-09-14

    This memorandum constitutes our September 2015 level 4 milestone for the project entitled “Johnson Noise Thermometry for Drift-free Temperature Measurements” and satisfies the Milestone/Activity (Conclude HFIR field demonstration of JNT prototype). The progress summary describes the work performed to complete the subject milestone.

  11. 10 CFR 603.1105 - Advance payments or payable milestones.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 603.1105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT... projected budget for completing the milestone; and (2) Adjust future payable milestones, as needed, if... milestone payment of Federal funds). For this example, the contracting officer should adjust...

  12. Age cohort differences in the developmental milestones of gay men.

    PubMed

    Drasin, Harry; Beals, Kristin P; Elliott, Marc N; Lever, Janet; Klein, David J; Schuster, Mark A

    2008-01-01

    As the social context in which gay men live changes due to greater visibility, greater acceptance, and easier access to gay subculture, gay males may self-identify and take part in gay social activities at earlier ages than in the past. This study examined whether developmental milestones associated with sexual orientation for gay men have changed over the past several decades. A large and diverse sample of 2,402 gay men who responded to a 1994 survey published in a national magazine provided retrospective information on the age at which they reached individual psychological, social, and sexual behavior developmental milestones. We found evidence that individual psychological and sexual behavior milestones (e.g., awareness of attraction to males, having an orgasm with other male) are slowly moving toward earlier chronological ages (by 1 year of age every 8-25 years, p < 0.05), whereas social milestones (e.g., coming out) are moving more rapidly in a similar direction (by 1 year of age every 2-5 years, p < 0.001). The authors perform an innovative sensitivity test to demonstrate the persistence of the finding after correcting for the bias attributable to underrepresentation of those who have not yet self-identified as gay in such samples. PMID:18826167

  13. Campaign 2 Level 2 Milestone Review 2009: Milestone # 3132 Determine Sustainable TATB Source and Processing Options, and Potential Binder Options

    SciTech Connect

    Schwartz, A J

    2009-09-28

    A presentation was made to the Milestone review committee on September 18, 2009 that outlined the efforts making up the achievement of the Campaign 2, Level 2 Milestone No.3132. After the presentation and review of the collective work, the committee determined that the milestone was successfully completed. Highlights from this review are discussed here. A brief summary of the discussion points includes: (1) It was clear that this work represents a comprehensive collection of experimental, modeling, literature review, and analysis activities with a thorough attention to the details. The deliverables include 2 technical presentations and 5 written reports describing this work. (2) This is a joint LLNL/LANL milestone led by Campaign 2 with leveraging effort from other campaigns and activities at LLNL: (a) The contributing programs included Enhanced Surveillance Campaign (ESC) and Readiness Campaign. Key technical elements of this work were built on scientific advances from the Laboratory Directed Research and Development (LDRD) program. (b) Part of this work covers activities associated with the Enhanced Collaboration (EC) with the Atomic Weapons Establishment (AWE). (3) This Milestone work has supported a high-level Directed Stockpile Work (DSW) Joint DoD/DOE TATB Production Initiative. This is an example of the strong relevance of this Milestone research to current stockpile issues. A summary of the future direction in this research area includes: (1) The Ionic Liquid (IL) re-crystallization process has been demonstrated to improve the performance of recrystallized TATB molecule. However, lower thermal stability of the IL crystallized material (compared to conventional TATB) warrants further study to understand the source of this effect. (2) The compatibility issue needs to be addressed in upcoming work. One concern is how the new solvent and ionic liquid used in the formulation process might behave in the nuclear explosive assembly. Similarly, compatibility studies

  14. Soil microflora and enzyme activities in rhizosphere of Transgenic Bt cotton hybrid under different intercropping systems and plant protection schedules

    NASA Astrophysics Data System (ADS)

    Biradar, D. P.; Alagawadi, A. R.; Basavanneppa, M. A.; Udikeri, S. S.

    2012-04-01

    Field experiments were conducted over three rainy seasons of 2005-06 to 2007-08 on a Vertisol at Dharwad, Karnataka, India to study the effect of intercropping and plant protection schedules on productivity, soil microflora and enzyme activities in the rhizosphere of transgenic Bt cotton hybrid. The experiment consisted of four intercropping systems namely, Bt cotton + okra, Bt cotton + chilli, Bt cotton + onion + chilli and Bt cotton + redgram with four plant protection schedules (zero protection, protection for Bt cotton, protection for intercrop and protection for both crops). Observations on microbial populations and enzyme activities were recorded at 45, 90, 135 and 185 (at harvest) days after sowing (DAS). Averaged over years, Bt cotton + okra intercropping had significantly higher total productivity than Bt cotton + chilli and Bt cotton + redgram intercropping system and was similar to Bt cotton + chilli + onion intercropping system. With respect to plant protection schedules for bollworms, protection for both cotton and intercrops recorded significantly higher yield than the rest of the treatments. Population of total bacteria, fungi, actinomycetes, P-solubilizers, free-living N2 fixers as well as urease, phosphatase and dehydrogenase enzyme activities increased up to 135 days of crop growth followed by a decline. Among the intercropping systems, Bt cotton + chilli recorded significantly higher population of microorganisms and enzyme activities than other cropping systems. While Bt cotton with okra as intercrop recorded the least population of total bacteria and free-living N2 fixers as well as urease activity. Intercropping with redgram resulted in the least population of actinomycetes, fungi and P-solubilizers, whereas Bt cotton with chilli and onion recorded least activities of dehydrogenase and phosphatase. Among the plant protection schedules, zero protection recorded maximum population of microorganisms and enzyme activities. This was followed by the

  15. Enhanced antitumor activity of low-dose continuous administration schedules of topotecan in prostate cancer

    PubMed Central

    Aljuffali, Ibrahim A; Mock, Jason N; Costyn, Leah J; Nguyen, Ha; Nagy, Tamas; Cummings, Brian S

    2011-01-01

    Purpose The objective of this study was to determine the antitumor effects of alternate dosing schedules of topotecan in prostate cancer. Results A concentration-dependent increase in cytotoxicity was observed in PC-3 and LNCaP cells after topotecan treatment using conventional and metronomic protocols. A significant increase in potency (2.4–18 fold, after 72 h) was observed following metronomic dosing compared with conventional dosing administration in both cell lines. Metronomic dosing also increased the percentage of PC-3 cells in the G2/M, compared with control, but did not alter LNCaP cell cycle distribution. Metronomic dosing increased p21 protein expression in LNCaP and PC-3 cells compared with conventional dosing. The observed in vitro activity was confirmed using an in vivo model of human prostate cancer. Metronomic dosing and continuous infusion decreased tumor volume significantly (p ≤ 0.05) compared with control and conventional topotecan treatment, but had no effect on tumor vascular staining. Methods The cytotoxicity of topotecan after conventional or metronomic dosing was determined by examining cellular morphology, mitochondrial enzymatic activity (MTT), total cellular protein (SRB), annexin V and propidium iodine (PI) staining, cell cycle and protein gel blot analysis in human prostate cancer cell lines (PC-3 and LNCaP) and the effects metronomic or continuous infusion on tumor growth in an in vivo tumor xenograft model. Conclusions These data support the hypothesis that low-dose continuous administration of topotecan increases potency compared with conventional dosing in prostate cancer. These data also suggest the novel finding that the enhanced antitumor activity of topotecan following low-dose exposure correlates to alterations in cell cycle and increased p21 expression. PMID:21709443

  16. Sulforaphane Bioavailability and Chemopreventive Activity in Women Scheduled for Breast Biopsy.

    PubMed

    Atwell, Lauren L; Zhang, Zhenzhen; Mori, Motomi; Farris, Paige E; Vetto, John T; Naik, Arpana M; Oh, Karen Y; Thuillier, Philippe; Ho, Emily; Shannon, Jackilen

    2015-12-01

    Epidemiologic studies suggest a protective effect of cruciferous vegetables on breast cancer. Sulforaphane (SFN), an active food component derived from crucifers, has been shown to be effective in breast cancer chemoprevention. This study evaluated the chemopreventive effect of SFN on selective biomarkers from blood and breast tissues. In a 2- to 8-week double-blinded, randomized controlled trial, 54 women with abnormal mammograms and scheduled for breast biopsy were randomized to consume a placebo or a glucoraphanin (GFN) supplement providing SFN (n = 27). Plasma and urinary SFN metabolites, peripheral blood mononuclear cell (PBMC) histone deacetylase (HDAC) activity, and tissue biomarkers (H3K18ac, H3K9ac, HDAC3, HDAC6, Ki-67, p21) were measured before and after the intervention in benign, ductal carcinoma in situ, or invasive ductal carcinoma breast tissues. Within the supplement group, Ki-67 (P = 0.003) and HDAC3 (P = 0.044) levels significantly decreased in benign tissue. Pre-to-postintervention changes in these biomarkers were not significantly different between treatment groups after multiple comparison adjustment. GFN supplementation was associated with a significant decrease in PBMC HDAC activity (P = 0.04). No significant associations were observed between SFN and examined tissue biomarkers when comparing treatment groups. This study provides evidence that GFN supplementation for a few weeks is safe but may not be sufficient for producing changes in breast tissue tumor biomarkers. Future studies employing larger sample sizes should evaluate alternative dosing and duration regimens to inform dietary SFN strategies in breast cancer chemoprevention. PMID:26511489

  17. Bipedality and hair loss in human evolution revisited: The impact of altitude and activity scheduling.

    PubMed

    Dávid-Barrett, Tamás; Dunbar, Robin I M

    2016-05-01

    Bipedality evolved early in hominin evolution, and at some point was associated with hair loss over most of the body. One classic explanation (Wheeler 1984: J. Hum. Evol. 13, 91-98) was that these traits evolved to reduce heat overload when australopiths were foraging in more open tropical habitats where they were exposed to the direct effects of sunlight at midday. A recent critique of this model (Ruxton & Wilkinson 2011a: Proc. Natl. Acad. Sci. USA 108, 20965-20969) argued that it ignored the endogenous costs of heat generated by locomotion, and concluded that only hair loss provided a significant reduction in heat load. We add two crucial corrections to this model (the altitude at which australopiths actually lived and activity scheduling) and show that when these are included there are substantial reductions in heat load for bipedal locomotion even for furred animals. In addition, we add one further consideration to the model: we extend the analysis across the full 24 h day, and show that fur loss could not have evolved until much later because of the thermoregulatory costs this would have incurred at the altitudes where australopiths actually lived. Fur loss is most likely associated with the exploitation of open habitats at much lower altitudes at a much later date by the genus Homo. PMID:27178459

  18. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling.... (2) It is essential that adequate funds be programmed on ENG Form 2213, Advance Engineering...

  19. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling.... (2) It is essential that adequate funds be programmed on ENG Form 2213, Advance Engineering...

  20. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling.... (2) It is essential that adequate funds be programmed on ENG Form 2213, Advance Engineering...

  1. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling.... (2) It is essential that adequate funds be programmed on ENG Form 2213, Advance Engineering...

  2. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling.... (2) It is essential that adequate funds be programmed on ENG Form 2213, Advance Engineering...

  3. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  4. Overwintering strategy of Yunnan snub-nosed monkeys: adjustments in activity scheduling and foraging patterns.

    PubMed

    Grueter, Cyril C; Li, Dayong; Ren, Baoping; Li, Ming

    2013-04-01

    Temperate forests are characterized by pronounced climatic and phenological seasonality. Primates inhabiting such environments experience prolonged resource scarcity and low ambient temperatures in winter and are expected to adjust time allocation and foraging behavior so as to maintain their energy balance. We analyzed the activity scheduling of a group of Yunnan snub-nosed monkeys (Rhinopithecus bieti) based on data collected over 20 months in the high-altitude (>3000 m) Samage Forest, Baimaxueshan Nature Reserve, PRC. The forest consists of evergreen conifers and oaks and deciduous broadleaf trees. The diet varied seasonally, with young leaves preferentially exploited in spring and fruits in summer. The monkeys subsisted on readily available fallback resources (mainly lichens) in winter [Grueter et al. in (Am J Phys Anthropol 140:700-715, 2009)]. We predicted that this switch to a relatively low-quality diet would prompt an increase in feeding effort and decrease in moving effort. We found that the monkeys spent significantly more time feeding in winter than in the other seasons. The monthly time devoted to feeding was also negatively correlated with temperature and positively with percentage of lichens in the diet. Time spent on moving did not vary among seasons or with temperature, but day-journey length was found to be longer on hotter days. Time spent resting was lower in winter and under colder conditions and was also negatively correlated with time spent feeding, indicating that resting time is converted into feeding time during times of ecological stress. These results indicate a strong effect of seasonality on time allocation patterns, constraints on inactivity phases, and the prevalence of an energy-conserving foraging strategy in winter, when costs of thermoregulation were high and the availability of preferred food was low. PMID:23160943

  5. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 11: PEP, cost, schedules, and work breakdown structure dictionary

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Cost scheduling and funding data are presented for the reference design of the power extension package. Major schedule milestones are correlated with current Spacelab flight dates. Funding distributions provide for minimum expenditure during the first year of the project.

  6. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  7. Gain-Scheduled Approximations to H-Infinity Controllers for the F/A-18 Active Aeroelastic Wing

    NASA Technical Reports Server (NTRS)

    Lind, Rick

    1999-01-01

    The Active Aeroelastic Wing will demonstrate technologies related to aeroservoelastic effects such as wing twist and load minimization. This paper presents a control design based on H-infinity synthesis that simultaneously considers the multiple objectives associated with handling qualities, actuator limitations, and loads. The controller is realized as a filter and gain set approximation to a state-space H-infinity controller. This approximation allows scheduling of the controller over a flight envelope.

  8. Scheduling language and algorithm development study. Appendix: Study approach and activity summary

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

  9. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... § 745.1 of the Export Administration Regulations (EAR) (15 CFR parts 730 through 774). For specific... International Traffic in Arms Regulations (22 CFR parts 120 through 130) for Schedule 1 chemicals subject to...

  10. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... § 745.1 of the Export Administration Regulations (EAR) (15 CFR parts 730 through 774). For specific... International Traffic in Arms Regulations (22 CFR parts 120 through 130) for Schedule 1 chemicals subject to...

  11. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... § 745.1 of the Export Administration Regulations (EAR) (15 CFR parts 730 through 774). For specific... International Traffic in Arms Regulations (22 CFR parts 120 through 130) for Schedule 1 chemicals subject to...

  12. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... § 745.1 of the Export Administration Regulations (EAR) (15 CFR parts 730 through 774). For specific... International Traffic in Arms Regulations (22 CFR parts 120 through 130) for Schedule 1 chemicals subject to...

  13. 15 CFR 712.2 - Restrictions on activities involving Schedule 1 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... § 745.1 of the Export Administration Regulations (EAR) (15 CFR parts 730 through 774). For specific... International Traffic in Arms Regulations (22 CFR parts 120 through 130) for Schedule 1 chemicals subject to...

  14. Potent therapeutic activity of irinotecan (CPT-11) and its schedule dependency in medulloblastoma xenografts in nude mice.

    PubMed

    Vassal, G; Boland, I; Santos, A; Bissery, M C; Terrier-Lacombe, M J; Morizet, J; Sainte-Rose, C; Lellouch-Tubiana, A; Kalifa, C; Gouyette, A

    1997-09-26

    The anti-tumor activity of irinotecan (CPT-11), a DNA-topoisomerase 1 inhibitor, was evaluated in 5 advanced stage subcutaneous medulloblastoma xenografts in nude mice, using different schedules of administration. With a 5-day schedule, the highest i.v. dose tested (40 mg kg-1 day-1) induced complete regressions in all xenografts but 1, and delays in tumor growth always exceeded 30 days. Two xenografts, IGRM11 and IGRM33, were highly sensitive, and animals survived tumor-free beyond 120 days after treatment. CPT-11 clearly retained its anti-tumor activity at a lower dosage (27 mg kg-1 day-1). CPT-11 was significantly more active than cyclophosphamide, thiotepa and etoposide against the 3 xenografts evaluated. To study the schedule dependency of its anti-tumor activity, CPT-11 was given i.v. at the same total doses over the same period (33 days) using either a protracted or a sequential schedule in IGRM34-bearing mice. With a dose of 10 mg kg-1 day-1 given on days 0-4, days 7-11, days 21-25 and days 28-32 (total dose, 200 mg kg-1), 3 of 6 animals were tumor free on day 378. The same total dose given with a sequential schedule, i.e., 20 mg kg-1 day-1 on days 0-4 and days 28-32, failed to induce complete regression. The plasma pharmacokinetics of CPT-11 and SN-38 were studied in IGRM34-bearing animals after a single i.v. dose of 10 and 40 mg kg-1. The plasma clearance rate of CPT-11 was dose dependent. The ratio between the SN-38 and CPT-11 area under the curve in plasma was 0.4-0.65, i.e., significantly higher than that observed in humans at the maximum tolerated dose (0.01-0.05). Conversely, this ratio was 10-fold lower in tumor than in plasma. Clinical development of irinotecan is warranted in pediatric malignancies. PMID:9334824

  15. The range scheduling aid

    NASA Technical Reports Server (NTRS)

    Halbfinger, Eliezer M.; Smith, Barry D.

    1991-01-01

    The Air Force Space Command schedules telemetry, tracking and control activities across the Air Force Satellite Control network. The Range Scheduling Aid (RSA) is a rapid prototype combining a user-friendly, portable, graphical interface with a sophisticated object-oriented database. The RSA has been a rapid prototyping effort whose purpose is to elucidate and define suitable technology for enhancing the performance of the range schedulers. Designing a system to assist schedulers in their task and using their current techniques as well as enhancements enabled by an electronic environment, has created a continuously developing model that will serve as a standard for future range scheduling systems. The RSA system is easy to use, easily ported between platforms, fast, and provides a set of tools for the scheduler that substantially increases his productivity.

  16. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    NASA Astrophysics Data System (ADS)

    Nijland, Linda; Arentze, Theo; Timmermans, Harry

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of individuals indicate the importance of incorporating those pre-planned activities in the new generation of dynamic travel demand models. Elaborating and combining previous work on event-driven activity generation, the aim of this paper is to develop and illustrate an extension of a need-based model of activity generation that takes into account possible influences of pre-planned activities and events. This paper describes the theory and shows the results of simulations of the extension. The simulation was conducted for six different activities, and the parameter values used were consistent with an earlier estimation study. The results show that the model works well and that the influences of the parameters are consistent, logical, and have clear interpretations. These findings offer further evidence of face and construct validity to the suggested modeling approach.

  17. Level-2 Milestone 3244: Deploy Dawn ID Machine for Initial Science Runs

    SciTech Connect

    Fox, D

    2009-09-21

    This report documents the delivery, installation, integration, testing, and acceptance of the Dawn system, ASC L2 milestone 3244: Deploy Dawn ID Machine for Initial Science Runs, due September 30, 2009. The full text of the milestone is included in Attachment 1. The description of the milestone is: This milestone will be a result of work started three years ago with the planning for a multi-petaFLOPS UQ-focused platform (Sequoia) and will be satisfied when a smaller ID version of the final system is delivered, installed, integrated, tested, accepted, and deployed at LLNL for initial science runs in support of SSP mission. The deliverable for this milestone will be a LA petascale computing system (named Dawn) usable for code development and scaling necessary to ensure effective use of a final Sequoia platform (expected in 2011-2012), and for urgent SSP program needs. Allocation and scheduling of Dawn as an LA system will likely be performed informally, similar to what has been used for BlueGene/L. However, provision will be made to allow for dedicated access times for application scaling studies across the entire Dawn resource. The milestone was completed on April 1, 2009, when science runs began running on the Dawn system. The following sections describe the Dawn system architecture, current status, installation and integration time line, and testing and acceptance process. A project plan is included as Attachment 2. Attachment 3 is a letter certifying the handoff of the system to a nuclear weapons stockpile customer. Attachment 4 presents the results of science runs completed on the system.

  18. Milestone M4900: Simulant Mixing Analytical Results

    SciTech Connect

    Kaplan, D.I.

    2001-07-26

    This report addresses Milestone M4900, ''Simulant Mixing Sample Analysis Results,'' and contains the data generated during the ''Mixing of Process Heels, Process Solutions, and Recycle Streams: Small-Scale Simulant'' task. The Task Technical and Quality Assurance Plan for this task is BNF-003-98-0079A. A report with a narrative description and discussion of the data will be issued separately.

  19. 14 CFR 1274.908 - Milestone payments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Milestone payments. 1274.908 Section 1274... to the NASA paying office, the original invoice should be submitted to: (ii) If the Recipient is not authorized to submit invoices directly to the NASA paying office, the original invoice should be submitted...

  20. 47 CFR 25.164 - Milestones.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Milestones. (a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems.... (b) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems... both non-geostationary orbit satellites and geostationary orbit satellites, other than DBS and...

  1. 47 CFR 25.164 - Milestones.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Milestones. (a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems...) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems licensed on... first space station, place it in the authorized orbit, and operate it in accordance with the...

  2. 47 CFR 25.164 - Milestones.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Milestones. (a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems.... (b) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems... both non-geostationary orbit satellites and geostationary orbit satellites, other than DBS and...

  3. 47 CFR 25.164 - Milestones.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Milestones. (a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems.... (b) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems... both non-geostationary orbit satellites and geostationary orbit satellites, other than DBS and...

  4. 47 CFR 25.164 - Milestones.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Milestones. (a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems.... (b) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems... both non-geostationary orbit satellites and geostationary orbit satellites, other than DBS and...

  5. Milestones in Cancer Research and Discovery

    Cancer.gov

    During the past 250 years, we have witnessed many landmark discoveries in our efforts to make progress against cancer, an affliction known to humanity for thousands of years. This timeline shows a few key milestones in the history of cancer research.

  6. Developmental Milestones in Toddlers with Atypical Development

    ERIC Educational Resources Information Center

    Horovitz, Max; Matson, Johnny L.

    2011-01-01

    The attainment of developmental milestones was examined and compared in 162 infants and toddlers with developmental disabilities, including Down Syndrome (n = 26), Cerebral Palsy (n = 19), Global Developmental Delay (n = 22), Premature birth (n = 66), and Seizure Disorder (n = 29). Toddlers in the Seizures Disorder group began crawling at a…

  7. Developmental milestones record - 3 years

    MedlinePlus

    ... play area and constant supervision. Provide the necessary space for physical activity. Help your child take part in -- and learn the rules of -- sports and games. Limit both the time and content of television and computer viewing. Visit ...

  8. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  9. 10 CFR 603.1105 - Advance payments or payable milestones.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Advance payments or payable milestones. 603.1105 Section 603.1105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT... projected budget for completing the milestone; and (2) Adjust future payable milestones, as needed,...

  10. 43 CFR 3930.30 - Diligent development milestones.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Diligent development milestones. 3930.30... LEASES Management of Oil Shale Exploration Licenses and Leases § 3930.30 Diligent development milestones... diligent development milestones, the BLM may initiate lease cancellation. In order to be...

  11. The Effects of the Mars Exploration Rovers (MER) Work Schedule Regime on Locomotor Activity Circadian Rhythms, Sleep and Fatigue

    NASA Technical Reports Server (NTRS)

    DeRoshia, Charles W.; Colletti, Laura C.; Mallis, Melissa M.

    2008-01-01

    This study assessed human adaptation to a Mars sol by evaluating sleep metrics obtained by actigraphy and subjective responses in 22 participants, and circadian rhythmicity in locomotor activity in 9 participants assigned to Mars Exploration Rover (MER) operational work schedules (24.65 hour days) at the Jet Propulsion Laboratory in 2004. During MER operations, increased work shift durations and reduced sleep durations and time in bed were associated with the appearance of pronounced 12-hr (circasemidian) rhythms with reduced activity levels. Sleep duration, workload, and circadian rhythm stability have important implications for adaptability and maintenance of operational performance not only of MER operations personnel but also in space crews exposed to a Mars sol of 24.65 hours during future Mars missions.

  12. Sleep Duration, Schedule and Quality among Urban Chinese Children and Adolescents: Associations with Routine After-School Activities

    PubMed Central

    Jiang, Xiaoxiao; Hardy, Louise L.; Baur, Louise A.; Ding, Ding; Wang, Ling; Shi, Huijing

    2015-01-01

    Background With rapid urbanization accompanied by lifestyle changes, children and adolescents living in metropolitan areas are faced with many time use choices that compete with sleep. This study reports on the sleep hygiene of urban Chinese school students, and investigates the relationship between habitual after-school activities and sleep duration, schedule and quality on a regular school day. Methods Cross-sectional, school-based survey of school children (Grades 4–8) living in Shanghai, China, conducted in 2011. Self-reported data were collected on students’ sleep duration and timing, sleep quality, habitual after-school activities (i.e. homework, leisure-time physical activity, recreational screen time and school commuting time), and potential correlates. Results Mean sleep duration of this sample (mean age: 11.5-years; 48.6% girls) was 9 hours. Nearly 30% of students reported daytime tiredness. On school nights, girls slept less (p<0.001) and went to bed later (p<0.001), a sex difference that was more pronounced in older students. Age by sex interactions were observed for both sleep duration (p=0.005) and bedtime (p=0.002). Prolonged time spent on homework and mobile phone playing was related to shorter sleep duration and later bedtime. Adjusting for all other factors, with each additional hour of mobile phone playing, the odds of daytime tiredness and having difficulty maintaining sleep increased by 30% and 27% among secondary students, respectively. Conclusion There are sex differences in sleep duration, schedule and quality. Habitual activities had small but significant associations with sleep hygiene outcomes especially among secondary school students. Intervention strategies such as limiting children’s use of electronic screen devices after school are implicated. PMID:25611973

  13. The ACGME Milestone Project in ophthalmology.

    PubMed

    Lee, Andrew G; Arnold, Anthony C

    2013-01-01

    The ACGME is moving towards the next generation of accreditation in the USA called the Next Accreditation System (NAS). The NAS is anticipated to reduce the burden on programs to comply with accreditation requirements; to produce meaningful, innovative, and continuous benchmark outcomes data; to use ongoing individual and programmatic milestones to judge performance; and ultimately to produce better trained residents, to improve the quality of care, to reduce health care costs and health care disparities, and to provide objective evidence to the public and other external stakeholders of the quality of graduate medical education across the specialties of medicine. We describe the ACGME milestone development process for ophthalmology. If successful, the NAS will benefit all programs by reducing the programmatic burden and paperwork; increasing accreditation cycle length; and improving all programs through formative and summative feedback. PMID:23768922

  14. Milestones Toward Majorana-Based Quantum Computing

    NASA Astrophysics Data System (ADS)

    Aasen, David; Hell, Michael; Mishmash, Ryan V.; Higginbotham, Andrew; Danon, Jeroen; Leijnse, Martin; Jespersen, Thomas S.; Folk, Joshua A.; Marcus, Charles M.; Flensberg, Karsten; Alicea, Jason

    2016-07-01

    We introduce a scheme for preparation, manipulation, and read out of Majorana zero modes in semiconducting wires with mesoscopic superconducting islands. Our approach synthesizes recent advances in materials growth with tools commonly used in quantum-dot experiments, including gate control of tunnel barriers and Coulomb effects, charge sensing, and charge pumping. We outline a sequence of milestones interpolating between zero-mode detection and quantum computing that includes (1) detection of fusion rules for non-Abelian anyons using either proximal charge sensors or pumped current, (2) validation of a prototype topological qubit, and (3) demonstration of non-Abelian statistics by braiding in a branched geometry. The first two milestones require only a single wire with two islands, and additionally enable sensitive measurements of the system's excitation gap, quasiparticle poisoning rates, residual Majorana zero-mode splittings, and topological-qubit coherence times. These pre-braiding experiments can be adapted to other manipulation and read out schemes as well.

  15. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  16. The Over-Scheduling Hypothesis Revisited: Intensity of Organized Activity Participation During Adolescence and Young Adult Outcomes.

    PubMed

    Mahoney, Joseph L; Vest, Andrea E

    2012-09-01

    Concern exists that youth who spend a lot of time participating in organized out-of-school activities (e.g., sports) are at-risk for poor developmental outcomes. This concern - called the over-scheduling hypothesis - has primarily been assessed in terms of adolescent adjustment. This longitudinal study of a nationally representative sample of 1,115 youth (ages 12-18) assessed long-term relations between intensity of participation during adolescence and adjustment at young adulthood (ages 18-24). Time diaries measured intensity as hours per week of participation. Results showed that, controlling for demographic factors and baseline adjustment, intensity was a significant predictor of positive outcomes (e.g., psychological flourishing, civic engagement, educational attainment) and unrelated to indicators of problematic adjustment (e.g., psychological distress, substance use, antisocial behavior) at young adulthood. PMID:23066336

  17. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    SciTech Connect

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  18. 2014 Report on the Milestones for the US National Plan to Address Alzheimer's Disease.

    PubMed

    Fargo, Keith N; Aisen, Paul; Albert, Marilyn; Au, Rhoda; Corrada, Maria M; DeKosky, Steven; Drachman, David; Fillit, Howard; Gitlin, Laura; Haas, Magali; Herrup, Karl; Kawas, Claudia; Khachaturian, Ara S; Khachaturian, Zaven S; Klunk, William; Knopman, David; Kukull, Walter A; Lamb, Bruce; Logsdon, Rebecca G; Maruff, Paul; Mesulam, Marsel; Mobley, William; Mohs, Richard; Morgan, David; Nixon, Ralph A; Paul, Steven; Petersen, Ronald; Plassman, Brenda; Potter, William; Reiman, Eric; Reisberg, Barry; Sano, Mary; Schindler, Rachel; Schneider, Lon S; Snyder, Peter J; Sperling, Reisa A; Yaffe, Kristine; Bain, Lisa J; Thies, William H; Carrillo, Maria C

    2014-10-01

    With increasing numbers of people with Alzheimer's and other dementias across the globe, many countries have developed national plans to deal with the resulting challenges. In the United States, the National Alzheimer's Project Act, signed into law in 2011, required the creation of such a plan with annual updates thereafter. Pursuant to this, the US Department of Health and Human Services (HHS) released the National Plan to Address Alzheimer's Disease in 2012, including an ambitious research goal of preventing and effectively treating Alzheimer's disease by 2025. To guide investments, activities, and the measurement of progress toward achieving this 2025 goal, in its first annual plan update (2013) HHS also incorporated into the plan a set of short, medium and long-term milestones. HHS further committed to updating these milestones on an ongoing basis to account for progress and setbacks, and emerging opportunities and obstacles. To assist HHS as it updates these milestones, the Alzheimer's Association convened a National Plan Milestone Workgroup consisting of scientific experts representing all areas of Alzheimer's and dementia research. The workgroup evaluated each milestone and made recommendations to ensure that they collectively constitute an adequate work plan for reaching the goal of preventing and effectively treating Alzheimer's by 2025. This report presents these Workgroup recommendations. PMID:25341459

  19. Predicting real-world functional milestones in schizophrenia.

    PubMed

    Olsson, Anna-Karin; Hjärthag, Fredrik; Helldin, Lars

    2016-08-30

    Schizophrenia is a severe disorder that often causes impairments in major areas of functioning, and most patients do not achieve expected real-world functional milestones. The aim of this study was to identify which variables of demography, illness activity, and functional capacity predict patients' ability to attain real-world functional milestones. Participants were 235 outpatients, 149 men and 86 women, diagnosed with schizophrenia spectrum disorder. Our results showed that younger patients managed to achieve a higher level of functioning in educational level, marital status, and social contacts. Patients' functional capacity was primarily associated with educational level and housing situation. We also found that women needed less support regarding housing and obtained a higher level of marital status as compared with men. Our findings demonstrate the importance of considering current symptoms, especially negative symptoms, and remission stability over time, together with age, duration of illness, gender, educational level, and current functional capacity, when predicting patients' future real-world functioning. We also conclude that there is an advantage in exploring symptoms divided into positive, negative, and general domains considering their probable impact on functional achievements. PMID:27235985

  20. Construction Milestone Announced on Green Bank Telescope

    NASA Astrophysics Data System (ADS)

    2000-04-01

    The National Radio Astronomy Observatory announces completion of a major construction milestone on the world's largest fully steerable radio telescope - the National Science Foundation's Green Bank Telescope (GBT). The last of 2,004 aluminum surface panels was recently installed on the GBT's two-acre (100 m x 110 m) collecting dish. The telescope is located at NRAO's Green Bank site, in rural Pocahontas County, West Virginia. The GBT will be used to study everything from the formation of galaxies in the early universe, to the chemical make-up of the dust and gas inside galaxies and in the voids that separate them, to the birth processes of stars. In conjunction with other instruments, it will help make highly accurate radar maps of some familiar objects in our own solar system. The GBT is an engineering marvel. At 485 feet tall, it is comparable in height to the Washington Monument. It weighs 16 million pounds, yet by swiveling the dish in both azimuth and elevation, it can be pointed to any point in the sky with exquisite accuracy. Additionally, the telescope's two-acre collecting dish has many novel features. Most radio telescopes in use today use receivers suspended above the dish by four struts. These struts block some of the surface of the dish, scattering some of the incoming radio waves from celestial objects under study. The GBT's offset feedarm has no struts to block incoming radio waves. The GBT also boasts an active surface. The surface of the dish is composed of 2,004 panels. On the underside of the dish, actuators are located at each corner (i.e., intersection of four panels). These actuators are motors that move the surface panels up and down, keeping the (paraboloid) shape of the dish precisely adjusted, no matter what the tilt of the telescope. The combination of its unblocked aperture and active surface promise that the GBT will display extremely high sensitivity to faint radio signals. The GBT itself is not the only precious national resource in

  1. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Field A8. A10 Enter the last two digits of the fiscal year the function is scheduled for study or next... to provide career progression to a needed military skill level in accordance with paragraph E.2.a(1... Indicates that the Installation commander is not scheduling this CA for cost study under the provisions...

  2. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Field A8. A10 Enter the last two digits of the fiscal year the function is scheduled for study or next... to provide career progression to a needed military skill level in accordance with paragraph E.2.a(1... Indicates that the Installation commander is not scheduling this CA for cost study under the provisions...

  3. Level-2 Milestone 5213. CTS-1 Contract Award Completed

    SciTech Connect

    Leininger, Matt

    2015-09-24

    This report documents the fact that the first commodity technology (CT) system contract award, CTS-1, has been completed. The description of the milestone is: Based on Tri-Lab CTS-1 process and review, LLNL successfully awards the procurement for the next-generation Tri-Lab Linux CTS-1. The milestone completion criterion is: Signed contract. The milestone was completed on September 24th. 2015.

  4. Effects of a Photo Activity Schedule Book on Independent Task Changes by Students with Intellectual Disabilities in Community and School Job Sites

    ERIC Educational Resources Information Center

    Carson, Keyla D; Gast, David L.; Ayres, Kevin M.

    2008-01-01

    The purpose of this study was to evaluate the effectiveness of using a photo activity schedule book to increase independent transitioning between vocational tasks inside a school cafeteria and at a community job site. Three students with mild to moderate intellectual disabilities, enrolled in a self-contained classroom in a public high school,…

  5. Pediatrics milestone project: next steps toward meaningful outcomes assessment.

    PubMed

    Hicks, Patricia J; Englander, Robert; Schumacher, Daniel J; Burke, Ann; Benson, Bradley J; Guralnick, Susan; Ludwig, Stephen; Carraccio, Carol

    2010-12-01

    In the September 2010 issue of JGME, the Pediatric Milestones Working Group published "The Pediatrics Milestones: Conceptual Framework, Guiding Principles, and Approach to Development", a document that describes the construction of the first iteration of the Pediatric Milestones. These Milestones were developed by the Working Group as a group of practical behavioral expectations for each of the 52 sub-competencies. In constructing these Milestones, the authors were cognizant of the need to ground the Milestones themselves in evidence, theories or other conceptual frameworks that would provide the basis for the ontogeny of development for each sub-competency. During this next phase of the Milestones development, the process will continue with consultation with content experts and consideration of assessment of Milestones. We have described possible measurement tools, explored threats to validity, establishment of benchmarks, and possible approaches to reporting of performance. The vision of the Pediatrics Milestone Project is to understand the development of a pediatrician from entry into medical school through the twilight of a physician's career, and the work will require a collaborative effort of the undergraduate and graduate medical education communities, and the accrediting and certifying bodies. PMID:22132281

  6. 18. INTERIOR OF CIVIL RIGHTS INSTITUTE, MILESTONE GALLERY EXHIBITION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. INTERIOR OF CIVIL RIGHTS INSTITUTE, MILESTONE GALLERY EXHIBITION OF THE SIXTEENTH STREET CHURCH, LOOKING NORTHWEST - Sixteenth Street Baptist Church, 1530 Sixth Avenue North, Birmingham, Jefferson County, AL

  7. Historical milestones and future prospects of cluster ion beam technology

    NASA Astrophysics Data System (ADS)

    Yamada, Isao

    2014-08-01

    Development of technology for processing of surfaces by means of gas cluster ion beams began only about a quarter century ago even though fundamental research related to generation of gas clusters began much earlier. Industrial applications of cluster ion beams did not start to be explored until commercial equipment was first introduced to the ion beam community in around 2000. The technology is now evolving rapidly with industrial equipment being engineered for many diverse surface processing applications which are made possible by the unique characteristics of cluster-ion/solid-surface interactions. In this paper, important historical milestones in cluster ion beam development are described. Present activities related to a wide range of industrial applications in semiconductors, magnetic and optical devices, and bio-medical devices are reviewed. Several emerging new advances in cluster beam applications for the future are also discussed.

  8. Artificial insemination history: hurdles and milestones

    PubMed Central

    Ombelet, W.; Van Robays, J.

    2015-01-01

    Artificial insemination with homologous (AIH) or donor semen (AID) is nowadays a very popular treatment procedure used for many subfertile women worldwide. The rationale behind artificial insemination is to increase gamete density at the site of fertilisation. The sequence of events leading to today’s common use of artificial insemination traces back to scientific studies and experimentation many centuries ago. Modern techniques used in human artificial insemination programmes are mostly adapted from the work on cattle by dairy farmers wishing to improve milk production by using artificial insemination with sperm of selected bulls with well chosen genetic traits. The main reason for the renewed interest in artificial insemination in human was associated with the refinement of techniques for the preparation of washed motile spermatozoa in the early years of IVF. The history of artificial insemination is reviewed with particular interest to the most important hurdles and milestones. PMID:26175891

  9. Milestones toward Majorana-based quantum computing

    NASA Astrophysics Data System (ADS)

    Alicea, Jason

    Experiments on nanowire-based Majorana platforms now appear poised to move beyond the preliminary problem of zero-mode detection and towards loftier goals of realizing non-Abelian statistics and quantum information applications. Using an approach that synthesizes recent materials growth breakthroughs with tools long successfully deployed in quantum-dot research, I will outline a number of relatively modest milestones that progressively bridge the gap between the current state of the art and these grand longer-term challenges. The intermediate Majorana experiments surveyed in this talk should be broadly adaptable to other approaches as well. Supported by the National Science Foundation (DMR-1341822), Institute for Quantum Information and Matter, and Walter Burke Institute at Caltech.

  10. Artificial insemination history: hurdles and milestones.

    PubMed

    Ombelet, W; Van Robays, J

    2015-01-01

    Artificial insemination with homologous (AIH) or donor semen (AID) is nowadays a very popular treatment procedure used for many subfertile women worldwide. The rationale behind artificial insemination is to increase gamete density at the site of fertilisation. The sequence of events leading to today's common use of artificial insemination traces back to scientific studies and experimentation many centuries ago. Modern techniques used in human artificial insemination programmes are mostly adapted from the work on cattle by dairy farmers wishing to improve milk production by using artificial insemination with sperm of selected bulls with well chosen genetic traits. The main reason for the renewed interest in artificial insemination in human was associated with the refinement of techniques for the preparation of washed motile spermatozoa in the early years of IVF. The history of artificial insemination is reviewed with particular interest to the most important hurdles and milestones. PMID:26175891

  11. 43 CFR 3930.30 - Diligent development milestones.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Diligent development milestones. 3930.30... Management of Oil Shale Exploration Licenses and Leases § 3930.30 Diligent development milestones. (a... lease, POD, and these regulations. If the operator does not maintain or comply with diligent...

  12. 10 CFR 603.1105 - Advance payments or payable milestones.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Advance payments or payable milestones. 603.1105 Section 603.1105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Post-Award Administration § 603.1105 Advance payments or payable milestones. The contracting officer must: (a) For any expenditure-based TIA...

  13. Age-aware solder performance models : level 2 milestone completion.

    SciTech Connect

    Neilsen, Michael K.; Vianco, Paul Thomas; Neidigk, Matthew Aaron; Holm, Elizabeth Ann

    2010-09-01

    Legislated requirements and industry standards are replacing eutectic lead-tin (Pb-Sn) solders with lead-free (Pb-free) solders in future component designs and in replacements and retrofits. Since Pb-free solders have not yet seen service for long periods, their long-term behavior is poorly characterized. Because understanding the reliability of Pb-free solders is critical to supporting the next generation of circuit board designs, it is imperative that we develop, validate and exercise a solder lifetime model that can capture the thermomechanical response of Pb-free solder joints in stockpile components. To this end, an ASC Level 2 milestone was identified for fiscal year 2010: Milestone 3605: Utilize experimentally validated constitutive model for lead-free solder to simulate aging and reliability of solder joints in stockpile components. This report documents the completion of this milestone, including evidence that the milestone completion criteria were met and a summary of the milestone Program Review.

  14. Campaign 2 Level 2 Milestone Review 2009: Milestone # 3131 Grain Scale Simulation of Pore Collapse

    SciTech Connect

    Schwartz, A J

    2009-09-28

    The milestone reviewed on Sept. 16, 2009 was 'High-fidelity simulation of shock initiation of high explosives at the grain scale using coupled hydrodynamics, thermal transport and chemistry'. It is the opinion of the committee that the team has satisfied the milestone. A detailed description of how the goals were met is provided. The milestone leveraged capabilities from ASC Physics and Engineering Materials program combined with experimental input from Campaign 2. A combined experimental-multiscale simulation approach was used to create and validate the various TATB model components. At the lowest length scale, quantum chemical calculations were used to determine equations of state, thermal transport properties and reaction rates for TATB as it is decomposing. High-pressure experiments conducted in diamond anvil cells, gas guns and the Z machine were used to validate the EOS, thermal conductivity, specific heat and predictions of water formation. The predicted reaction networks and chemical kinetic equations were implemented in Cheetah and validated against the lower length scale data. Cheetah was then used within the ASC code ALE3D for high-resolution, thermo-mechanically coupled simulations of pore collapse at the micron size scale to predict conditions for detonation initiation.

  15. ASTER Scheduling Prioritization Function

    NASA Technical Reports Server (NTRS)

    Cohen, Ron

    1996-01-01

    ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

  16. Scheduling Software for Complex Scenarios

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

  17. LANL'S DEVELOPMENT OF SCHEDULE CONTINGENCY BASED ON PROBABILISTIC RISK RESULTS

    SciTech Connect

    F. K. HOUGHTON; J. P. KINDINGER; ET AL

    2001-03-01

    The need for budget reserve in project planning is widely recognized, but the need for a corresponding schedule reserve is generally not as universally acknowledged. Los Alamos National Laboratory (LANL) performs probabilistic project risk analyses for all major projects; the question has become how to more fully use the results of the schedule analyses to establish a schedule reserve. Before the use of quantitative project risk analysis, milestones were based on the initial point estimate with float time as the only time reserved for delays. With this practice, the set of tasks that have duration reserve is limited. In particular, critical path tasks, which do not have associated float, do not have reserve schedule time to use for delays. For other tasks, float was used on a ''first-come, first-served'' basis without allocation to other tasks. Thus, it was not possible to systematically allocate schedule reserve to project tasks.

  18. Certification of Completion of ASC FY08 Level-2 Milestone ID #2933

    SciTech Connect

    Lipari, D A

    2008-06-12

    This report documents the satisfaction of the completion criteria associated with ASC FY08 Milestone ID No.2933: 'Deploy Moab resource management services on BlueGene/L'. Specifically, this milestone represents LLNL efforts to enhance both SLURM and Moab to extend Moab's capabilities to schedule and manage BlueGene/L, and increases portability of user scripts between ASC systems. The completion criteria for the milestone are the following: (1) Batch jobs can be specified, submitted to Moab, scheduled and run on the BlueGene/L system; (2) Moab will be able to support the markedly increased scale in node count as well as the wiring geometry that is unique to BlueGene/L; and (3) Moab will also prepare and report statistics of job CPU usage just as it does for the current systems it supports. This document presents the completion evidence for both of the stated milestone certification methods: Completion evidence for this milestone will be in the form of (1) documentation--a report that certifies that the completion criteria have been met; and (2) user hand-off. As the selected Tri-Lab workload manager, Moab was chosen to replace LCRM as the enterprise-wide scheduler across Livermore Computing (LC) systems. While LCRM/SLURM successfully scheduled jobs on BG/L, the effort to replace LCRM with Moab on BG/L represented a significant challenge. Moab is a commercial product developed and sold by Cluster Resources, Inc. (CRI). Moab receives the users batch job requests and dispatches these jobs to run on a specific cluster. SLURM is an open-source resource manager whose development is managed by members of the Integrated Computational Resource Management Group (ICRMG) within the Services and Development Division at LLNL. SLURM is responsible for launching and running jobs on an individual cluster. Replacing LCRM with Moab on BG/L required substantial changes to both Moab and SLURM. While the ICRMG could directly manage the SLURM development effort, the work to enhance Moab

  19. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks. Waste Management and Environmental Restoration Programs

    SciTech Connect

    Douglas, D.G.; Maresca, J.W. Jr.

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC).

  20. Annual Progress Report on the Development of Waste Tank Leak Monitoring and Detection and Mitigation Activities in Support of M-45-08

    SciTech Connect

    DEFIGH PRICE, C.

    2000-09-25

    Milestone M-45-09E of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) [TPA 1996] requires submittal of an annual progress report on the development of waste tank leak detection, monitoring, and mitigation (LDMM) activities associated with the retrieval of waste from single-shell tanks (SSTs). This report details progress for fiscal year 2000, building on the current LDMM strategy and including discussion of technologies, applications, cost, schedule, and technical data. The report also includes discussion of demonstrations conducted and recommendations for additional testing. Tri-Party Agreement Milestones M-45-08A and M-45-08B required design and demonstration of LDMM systems for initial retrieval of SST waste. These specific milestones have recently been deleted as part of the M-45-00A change package. Future LDMM development work has been incorporated into specific technology demonstration milestones and SST waste retrieval milestones in the M-45-03 and M-45-05 milestone series.

  1. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    SciTech Connect

    Seed, Ian; James, Paula; Mathieson, John; Judd, Laurie; Elmetti-Ramirez, Rosa; Han, Ana

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  2. Milestones in the history of personality disorders

    PubMed Central

    Crocq, Marc-Antoine

    2013-01-01

    This paper analyzes the major historical milestones in the study of normal and abnormal personality, from antiquity up until the 20th century. Special attention is paid to the interaction between dimensional and typological approaches, which was a major issue during the preparation of DSM-5. Theories of personality started with the humoral theory of Greek medicine. Pinel, and later Esquirol and Prichard, are credited with the first descriptions of abnormal personalities in textbooks of psychiatry. Between the late 19th and early 20th centuries, elaborate systems of normal and abnormal personality, associating to some degree types and dimensions, were devised by a succession of European psychologists, such as Ribot, Heymans, and Lazursky. Emil Kraepelin and Kurt Schneider proposed classifications of abnormal personality types. In parallel, psychoanalysts stressed the role of early life experiences. Towards the mid-20th century, statistical methods were applied to the scientific validation of personality dimensions with pioneers such as Cattell, anticipating the five-factor model. PMID:24174889

  3. ASC Trilab L2 Codesign Milestone 2015

    SciTech Connect

    Trott, Christian Robert; Hammond, Simon David; Dinge, Dennis; Lin, Paul T.; Vaughan, Courtenay T.; Cook, Jeanine; Edwards, Harold C.; Rajan, Mahesh; Hoekstra, Robert J.

    2015-09-01

    For the FY15 ASC L2 Trilab Codesign milestone Sandia National Laboratories performed two main studies. The first study investigated three topics (performance, cross-platform portability and programmer productivity) when using OpenMP directives and the RAJA and Kokkos programming models available from LLNL and SNL respectively. The focus of this first study was the LULESH mini-application developed and maintained by LLNL. In the coming sections of the report the reader will find performance comparisons (and a demonstration of portability) for a variety of mini-application implementations produced during this study with varying levels of optimization. Of note is that the implementations utilized including optimizations across a number of programming models to help ensure claims that Kokkos can provide native-class application performance are valid. The second study performed during FY15 is a performance assessment of the MiniAero mini-application developed by Sandia. This mini-application was developed by the SIERRA Thermal-Fluid team at Sandia for the purposes of learning the Kokkos programming model and so is available in only a single implementation. For this report we studied its performance and scaling on a number of machines with the intent of providing insight into potential performance issues that may be experienced when similar algorithms are deployed on the forthcoming Trinity ASC ATS platform.

  4. Functional Communication Training and Chained Schedules of Reinforcement to Treat Challenging Behavior Maintained by Terminations of Activity Interruptions

    ERIC Educational Resources Information Center

    Falcomata, Terry S.; Roane, Henry S.; Muething, Colin S.; Stephenson, Kasey M.; Ing, Anna D.

    2012-01-01

    In this article, the authors evaluated functional communication training (FCT) and a chained schedule of reinforcement for the treatment of challenging behavior exhibited by two individuals diagnosed with Asperger syndrome and autism, respectively. Following a functional analysis with undifferentiated results, the authors demonstrated that…

  5. 32 CFR Appendix B to Part 169a - Commercial Activities Inventory Report and Five-Year Review Schedule

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Field A8. A10 Enter the last two digits of the fiscal year the function is scheduled for study or next...-shore assignments, or the CA is necessary to provide career progression to a needed military skill level... study under the provisions of congressional authority. Y Indicates that the CA is retained...

  6. Age of Achievement of Gross Motor Milestones in Infancy and Adiposity at Age 3 Years

    PubMed Central

    Neelon, Sara E. Benjamin; Oken, Emily; Taveras, Elsie M.; Rifas-Shiman, Sheryl L.; Gillman, Matthew W.

    2011-01-01

    Early life physical activity may help prevent obesity but is difficult to measure. The purpose of this study was to examine associations of age of achievement of gross motor milestones in infancy with adiposity at age 3 years. Seven forty one mother/infant dyads participated in a longitudinal study in Massachusetts. Exposures were age of attainment of 4 gross motor milestones—rolling over, sitting up, crawling, and walking. Outcomes were 3-year sum of subscapular and triceps skinfold thickness (SS + TR) for overall adiposity, their ratio (SS:TR) for central adiposity, and body mass index (BMI) z-score. We used linear regression models adjusted for confounders to examine motor milestone achievement and later adiposity. Rolling over (0.04, 95% CI: 0.008, 0.07) and sitting up (0.02, 95% CI: 0.001, 0.05) at ≥6 months were associated with increased SS:TR compared with attainment before 6 months. Walking at ≥15 months was associated with 0.98 mm higher SS + TR (95% CI: 0.05, 1.91) compared with walking before 12 months. Age at crawling was not associated with the outcomes. None of the milestones were associated with BMI z-score. Age of motor milestone achievement was only a modest predictor of adiposity. Later rolling over and sitting up were associated with greater central adiposity, and later age at walking was associated with greater overall adiposity at age 3 years. Although we controlled for birth weight and 6-month weight-for-length in our models, more detailed assessment of early adiposity prior to achievement of motor milestones is needed to help determine causality. PMID:21643834

  7. A Milestone for the VLT Interferometer

    NASA Astrophysics Data System (ADS)

    2000-10-01

    Less than one month after "First Light" for the fourth 8.2-m YEPUN telescope ( ESO PR 18/00 ), another special moment occurred at ESO's Paranal Observatory. This time, it was the first truly "underground" event, in the 168-metre long Interferometric Tunnel that has been dug beneath the platform at the top of the mountain. As one staff member remarked on this occasion, it was something like "the first scheduled trip of the Paranal metro"! With the successful integration of the first Delay Line on Monday, September 25th, 2000, ESO has accomplished another important step towards the VLT Interferometer (VLTI). It will be followed by the integration of the second Delay Line by the end of November and the third is scheduled for February 2001; both are now in their final development phase in Europe. "VLTI First Light" is then expected to take place soon thereafter, by means of two small special telescopes ("siderostats"). The combination of the light beams from two of the 8.2-m Unit Telescopes will happen in mid-2001. The VLTI Delay Lines The VLTI Delay Lines form essential parts of this very complicated optical system. They serve to ensure that the light beams from several telescopes arrive in phase at the common interferometric focus. Details about how they function may be found in ESO PR 04/98. In order to achieve the necessary performance, ESO has worked with two Dutch contractors, Fokker Space and TNO-TPD - Netherlands Organization for Applied Scientific Research - Institute of Applied Physics , to arrive at a totally new Delay Line concept. Another Dutch participant in the VLTI project is the Nova-ESO VLTI Expertise Centre (NEVEC) , cf. ESO PR 14/00. The installation at Paranal The last twelve months have been very busy for the integration team, with much preparatory work at the VLTI buildings for the final installation of the Delay Line systems. The assembly of the translation mechanisms for the first two Delay Lines in the tunnel started in mid-2000. This included

  8. Diurnal pituitary-adrenal activity during schedule-induced polydipsia of water and ethanol in cynomolgus monkeys (Macaca fascicularis)

    PubMed Central

    Helms, Christa M.; Gonzales, Steven W.; Green, Heather L.; Szeliga, Kendall T.; Rogers, Laura S.M.; Grant, Kathleen A.

    2013-01-01

    Rationale Intermittent delivery of an important commodity (e.g., food pellets) generates excessive behaviors as an adjunct to the schedule of reinforcement (adjunctive behaviors) that are hypothesized to be due to conflict between engaging and escaping a situation where reinforcement is delivered, but at sub-optimal rates. Objectives This study characterized the endocrine correlates during schedule-induced polydipsia (SIP) of water and ethanol using a longitudinal approach in non-human primates. Methods Plasma adrenocorticotropic hormone (ACTH) and cortisol were measured in samples from awake cynomolgus monkeys (Macaca fascicularis, 11 adult males) obtained at the onset, midday and offset of their 12-h light cycle. The monkeys were induced to drink water and ethanol (4% w/v, in water) using a fixed time (FT) 300-s interval schedule of pellet delivery. The induction fluid changed every 30 sessions in the following order: water, 0.5 g/kg ethanol, 1.0 g/kg ethanol, and 1.5 g/kg ethanol. Following induction, ethanol and water were concurrently available for 22 h/d. Results The FT300-s schedule gradually increased ACTH, but not cortisol, during water induction to a plateau sustained throughout ethanol induction in every monkey. Upon termination of the schedule, ACTH decreased to baseline and cortisol below baseline. Diurnal ACTH and cortisol were unrelated to the dose of ethanol, but ACTH rhythm flattened at 0.5 g/kg/d and remained flattened. Conclusions The coincidence of elevated ACTH with the initial experience of drinking to intoxication may have altered the mechanisms involved in the transition to heavy drinking. PMID:23508555

  9. Those Baby 'Milestones' May Have Longer-Term Importance

    MedlinePlus

    ... an important basis for various aspects of later child development." The research team -- led by Edwina Yeung, of ... and underweight. Those are key factors in a child's development, and might "overshadow" any link between movement milestones ...

  10. Hydrogen milestone could help lower fossil fuel refining costs

    SciTech Connect

    Stephen Herring

    2009-10-13

    Hydrogen researchers at the U.S. Department of Energy's Idaho National Laboratory have reached another milestone on the road to reducing carbon emissions and protecting the nation against the effects of peaking world oil production. Stephen Herring, lab

  11. Hydrogen milestone could help lower fossil fuel refining costs

    ScienceCinema

    Stephen Herring

    2010-01-08

    Hydrogen researchers at the U.S. Department of Energy's Idaho National Laboratory have reached another milestone on the road to reducing carbon emissions and protecting the nation against the effects of peaking world oil production. Stephen Herring, lab

  12. Milestones on the social accountability journey

    PubMed Central

    Hogenbirk, John C.; Timony, Patrick E.; French, Margaret G.; Strasser, Roger; Pong, Raymond W.; Cervin, Catherine; Graves, Lisa

    2016-01-01

    Abstract Objective To assess the effect of different levels of exposure to the Northern Ontario School of Medicine’s (NOSM’s) distributed medical education programs in northern Ontario on FPs’ practice locations. Design Cross-sectional design using longitudinal survey and administrative data. Setting Canada. Participants All 131 Canadian medical graduates who completed FP training in 2011 to 2013 and who completed their undergraduate (UG) medical degree or postgraduate (PG) residency training or both at NOSM. Intervention Exposure to NOSM’s medical education program at the UG (n = 49) or PG (n = 31) level or both (n = 51). Main outcome measures Primary practice location in September of 2014. Results Approximately 16% (21 of 129) of FPs were practising in rural northern Ontario, 45% (58 of 129) in urban northern Ontario, and 5% (7 of 129) in rural southern Ontario. Logistic regression found that more rural Canadian background years predicted rural practice in northern Ontario or Ontario, with odds ratios of 1.16 and 1.12, respectively. Northern Canadian background, sex, marital status, and having children did not predict practice location. Completing both UG and PG training at NOSM predicted practising in rural and northern Ontario locations with odds ratios of 4.06 to 48.62. Conclusion Approximately 61% (79 of 129) of Canadian medical graduate FPs who complete at least some of their training at NOSM practise in northern Ontario. Slightly more than a quarter (21 of 79) of these FPs practise in rural northern Ontario. The FPs with more years of rural background or those with greater exposure to NOSM’s medical education programs had higher odds of practising in rural northern Ontario. This study shows that NOSM is on the road to reaching one of its social accountability milestones. PMID:27427565

  13. Detailed leak detection test plan and schedule for Oak Ridge National Laboratory liquid low-level waste active tanks

    SciTech Connect

    1995-01-01

    This document provides a plan and schedule for leak testing a portion of the Liquid Low-Level Waste (LLLW) system at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. It is a concise version of a more general leak testing plan that was prepared in response to the requirements of the Federal Facility Agreement (FFA) for the Oak Ridge Reservation (ORR). This plan includes a schedule for the initial reporting of the leak test results from the various tanks that will be tested. The FFA distinguishes four categories of tank and pipeline systems: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA specifically requires leak testing of the Category C systems; there are 14 such tanks addressed in this plan, plus one tank (W-12) that has been temporarily returned to service based on EPA and TDEC concurrence. A schedule for testing these tanks is also included. The plan and schedule also addresses an additional 15 Category B tanks have been demonstrated to meet secondary containment requirements. While these 15 tanks are addressed in this plan for the sake of completeness, they have been removed from the leak testing program based on the design demonstrations that show secondary containment. It is noted that the general plan included 42 tanks. Since that report was issued, 26 of those tanks have passed secondary containment design demonstrations and subsequently have been removed from this leak testing plan. In addition, one tank (LA-104) has been removed from service. Accordingly, this document addresses 15 of the LLLW tanks in the system; plans for testing the pipelines will be described in a separate document.

  14. Managing Complex Environmental Remediation amidst Aggressive Facility Revitalization Milestones

    SciTech Connect

    Richter Pack, S.

    2008-07-01

    Unlike the final closure projects at Rocky Flats and Fernald, many of the Department of Energy's future CERCLA and RCRA closure challenges will take place at active facilities, such as the Oak Ridge National Laboratory (ORNL) central campus. ORNL has aggressive growth plans for a Research Technology Park and cleanup must address and integrate D and D, soil and groundwater remediation, and on-going and future business plans for the Park. Different planning and tracking tools are needed to support closures at active facilities. To support some large Airport redevelopment efforts, we created tools that allowed the Airline lease-holder to perform environmental remediation on the same schedule as building D and D and new building construction, which in turn allowed them to migrate real estate from unusable to usable within an aggressive schedule. In summary: The FIM and OpenGate{sup TM} spatial analysis system were two primary tools developed to support simultaneous environmental remediation, D and D, and construction efforts at an operating facility. These tools helped redevelopers to deal with environmental remediation on the same schedule as building D and D and construction, thereby meeting their goals of opening gates, restarting their revenue streams, at the same time complying with all environmental regulations. (authors)

  15. Guide to DCP Study Close-Out: Milestones and Tasks | Division of Cancer Prevention

    Cancer.gov

    This guide assists Consortium Lead Organization (CLO) planning for DCP study close-out. Study close-out tasks are organized under milestones, which help mark progress toward completion of the close-out process. Once tasks associated with a milestone are underway, planning for the next milestone may begin. Click on a milestone to view the associated close-out tasks. |

  16. Scheduling Reconsidered (Again!)

    ERIC Educational Resources Information Center

    Hentschke, Guilbert C.; Fowler, William J.

    1974-01-01

    Computer technicians bring to school scheduling a certain naivete regarding the operation of schools. School administrators play a fundamental role of informing technicians about education scheduling needs. (Author)

  17. NASA launch schedule

    NASA Astrophysics Data System (ADS)

    Bell, Peter M.

    The National Aeronautics and Space Administration (NASA) has a record-setting launch schedule for 1984—10 space shuttle flights (see Table 1), 10 satellite deployments from the space shuttle in orbit and 12 unmanned missions using expendable launch vehicles. Also scheduled is the launch on March 1 for the National Oceanic and Atmospheric Administration of Landsat D‧, the nation's second earth resources satellite.The launch activity will begin February 3 with the launch of shuttle mission 41-B using the orbiter Challenger. Two communications satellites will be deployed from 41-B: Westar-VI, for Western Union, and Palapa B-2 for the government of Indonesia. The 8-day mission will feature the first shuttle landing at Kennedy Space Center in Florida; and the first flight of the Manned Maneuvering Unit, a self-contained, propulsive backpack that will allow astronauts to move about in space without being tethered to the spacecraft.

  18. Quarterly report on program cost and schedule, third quarter FY 1992

    SciTech Connect

    1992-10-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1992.

  19. [Specific activity of an UV-inactivated antirabies vaccine made from brain tissue administered in a shortened schedule].

    PubMed

    Morogova, V M; Magazov, R Sh; Gil'dina, S S; Latypova, R G; Shafeeva, R S

    1982-04-01

    The results obtained in the study of the specific potency of rabies vaccine prepared from sheep brain tissue and inactivated by UV irradiation indicate that, even in the presence of the lowest immunogenicity index (0.5), 5-6 injections of the vaccine, made not daily, but at interval of 3 and 7 days, induced the production of antibodies in the titers not lower than those resulting from 14-20 daily injections of the same vaccine or Fermi vaccine. The preparation inactivated by UV irradiation should be introduced for therapy according to the shortened immunization schedule with intervals, taking into account the immunogenicity index. PMID:7080770

  20. Modification and updating of the Manned Activity Scheduling System (MASS) for shuttle and shuttle payloads analysis. Volume 1: Model specifications

    NASA Technical Reports Server (NTRS)

    Ring, R. C.

    1973-01-01

    The LRC MASS was modified and updated to include logic for efficient analysis of space shuttle payload operations. All MASS computer models were reviewed for compatibility with, and applicability to, the shuttle sortie mission. The MASS modification efforts were concentrated on two computer programs, the general scheduling model (GSM) and one day model (ODM). A new computer program, the DAYLIB Tape Processor, was developed to update the link between the GSM and ODM. The resulting MASS is an operationally efficient analytical tool that will allow a rapid assessment of shuttle and shuttle payload operations.

  1. Preparing medical students for obstetrics and gynecology milestone level one: a description of a pilot curriculum

    PubMed Central

    Morgan, Helen; Marzano, David; Lanham, Michael; Stein, Tamara; Curran, Diana; Hammoud, Maya

    2014-01-01

    Background The implementation of the Accreditation Council for Graduate Medical Education (ACGME) Milestones in the field of obstetrics and gynecology has arrived with Milestones Level One defined as the level expected of an incoming first-year resident. Purpose We designed, implemented, and evaluated a 4-week elective for fourth-year medical school students, which utilized a multimodal approach to teaching and assessing the Milestones Level One competencies. Methods The 78-hour curriculum utilized traditional didactic lectures, flipped classroom active learning sessions, a simulated paging curriculum, simulation training, embalmed cadaver anatomical dissections, and fresh-frozen cadaver operative procedures. We performed an assessment of student knowledge and surgical skills before and after completion of the course. Students also received feedback on their assessment and management of eight simulated paging scenarios. Students completed course content satisfaction surveys at the completion of each of the 4 weeks. Results Students demonstrated improvement in knowledge and surgical skills at the completion of the course. Paging confidence trended toward improvement at the completion of the course. Student satisfaction was high for all of the course content, and the active learning components of the curriculum (flipped classroom, simulation, and anatomy sessions) had higher scores than the traditional didactics in all six categories of our student satisfaction survey. Conclusions This pilot study demonstrates a practical approach for preparing fourth-year medical students for the expectations of Milestones Level One in obstetrics and gynecology. This curriculum can serve as a framework as medical schools and specific specialties work to meet the first steps of the ACGME's Next Accreditation System. PMID:25430640

  2. Direct Observation Assessment of Milestones: Problems with Reliability

    PubMed Central

    Schott, Meghan; Kedia, Raashee; Promes, Susan B.; Swoboda, Thomas; O’Rourke, Kevin; Green, Walter; Liu, Rachel; Stansfield, Brent; Santen, Sally A.

    2015-01-01

    Introduction Emergency medicine (EM) milestones are used to assess residents’ progress. While some milestone validity evidence exists, there is a lack of standardized tools available to reliably assess residents. Inherent to this is a concern that we may not be truly measuring what we intend to assess. The purpose of this study was to design a direct observation milestone assessment instrument supported by validity and reliability evidence. In addition, such a tool would further lend validity evidence to the EM milestones by demonstrating their accurate measurement. Methods This was a multi-center, prospective, observational validity study conducted at eight institutions. The Critical Care Direct Observation Tool (CDOT) was created to assess EM residents during resuscitations. This tool was designed using a modified Delphi method focused on content, response process, and internal structure validity. Paying special attention to content validity, the CDOT was developed by an expert panel, maintaining the use of the EM milestone wording. We built response process and internal consistency by piloting and revising the instrument. Raters were faculty who routinely assess residents on the milestones. A brief training video on utilization of the instrument was completed by all. Raters used the CDOT to assess simulated videos of three residents at different stages of training in a critical care scenario. We measured reliability using Fleiss’ kappa and interclass correlations. Results Two versions of the CDOT were used: one used the milestone levels as global rating scales with anchors, and the second reflected a current trend of a checklist response system. Although the raters who used the CDOT routinely rate residents in their practice, they did not score the residents’ performances in the videos comparably, which led to poor reliability. The Fleiss’ kappa of each of the items measured on both versions of the CDOT was near zero. Conclusion The validity and

  3. Patient perceptions of severe COPD and transitions towards death: a qualitative study identifying milestones and developing key opportunities

    PubMed Central

    Landers, Amanda; Wiseman, Rachel; Pitama, Suzanne; Beckert, Lutz

    2015-01-01

    Background: Chronic obstructive pulmonary disease (COPD) is a slowly disabling illness, with functional limitations and a high burden of symptoms. Palliative care services focus on quality of life for those facing life-limiting illness. Patients with COPD often see their illness as a ‘way of life’, not as a life-threatening illness, which makes the interface difficult. Aims: The aim of this study was to explore the experience of patients with advanced COPD after a life-threatening event, particularly focusing on end-of-life issues. Methods: Qualitative methods were used to capture patient experiences. Patients admitted for noninvasive ventilation for COPD were recruited and interviewed in their homes following discharge. The interview schedule explored the participants' understanding of their illness, concerns and plans, exploring end-of-life issues and perceptions of palliative care. Results: Participants were recruited until themes were saturated. Six transition points or milestones emerged: loss of recreation, home environment, episodes of acute care, long-term oxygen treatment, panic attacks, and assistance with self-care were common themes throughout the narratives. Conclusions: Milestones accumulate in no particular order. They can be easily recognised and allow health professionals to develop a common language with their patients. In advancing COPD, milestones may trigger the reassessment of goals of care and integration of a palliative approach. PMID:26158886

  4. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

  5. The Block Scheduling Handbook.

    ERIC Educational Resources Information Center

    Queen, J. Allen

    Block scheduling encourages increased comprehensive immersion into subject matter, improved teacher-student relationships, and decreased disciplinary problems. While block scheduling may offer many advantages, moving to a block schedule from conventional scheduling can be a major adjustment for both students and teachers. This guide is intended to…

  6. Scheduling Spitzer: The SIRPASS Story

    NASA Technical Reports Server (NTRS)

    Mittman, David S.; Hawkins, Robert

    2013-01-01

    NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

  7. Level-2 Milestone 2351: Terascale Simulation Facility Upgrade

    SciTech Connect

    Bailey, A M

    2007-10-02

    This report documents the LLNL TSF upgrade ASC L2 milestone 2351: Terascale Simulation Facility upgrade, due Sept. 30, 2007. The full text of the milestone is included in Attachment 1. The stated goal of the milestone was: 'Complete a 3-MW expansion of electrical power for computing systems in the east computer room of the Terascale Simulation Facility (TSF) and complete the final connection of all air handlers that were delivered as part of the TSF line item'. In this report we detail the upgrade and cover the results of the process to accept the system by testing, adjusting, balancing and finally start-up of the system in accordance with the detailed project commissioning plan to be developed by the system engineers during the design phase of the project. The quarterly reports for the upgrade and the text of the project commissioning plan are included at the end of this document as Attachments 2 and 3.

  8. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  9. Optimizing Operating Room Scheduling.

    PubMed

    Levine, Wilton C; Dunn, Peter F

    2015-12-01

    This article reviews the management of an operating room (OR) schedule and use of the schedule to add value to an organization. We review the methodology of an OR block schedule, daily OR schedule management, and post anesthesia care unit patient flow. We discuss the importance of a well-managed OR schedule to ensure smooth patient care, not only in the OR, but throughout the entire hospital. PMID:26610624

  10. Extracting the diffusion tensor from molecular dynamics simulation with Milestoning

    SciTech Connect

    Mugnai, Mauro L.; Elber, Ron

    2015-01-07

    We propose an algorithm to extract the diffusion tensor from Molecular Dynamics simulations with Milestoning. A Kramers-Moyal expansion of a discrete master equation, which is the Markovian limit of the Milestoning theory, determines the diffusion tensor. To test the algorithm, we analyze overdamped Langevin trajectories and recover a multidimensional Fokker-Planck equation. The recovery process determines the flux through a mesh and estimates local kinetic parameters. Rate coefficients are converted to the derivatives of the potential of mean force and to coordinate dependent diffusion tensor. We illustrate the computation on simple models and on an atomically detailed system—the diffusion along the backbone torsions of a solvated alanine dipeptide.

  11. [The years in pictures; medical milestones since 1970].

    PubMed

    Langeveld, C H Kees; de Leeuw, Peter W

    2015-01-01

    The end of the year is always a perfect moment to look back. However, looking back over the past year alone is not enough if you want a complete picture of developments in medical science, which is why the Dutch Journal of Medicine (NTvG) has posted a timeline on its website charting medical milestones over the past 45 years. Some of these milestones are illustrated in the infographic in this number, and some interesting patterns can be observed. In this article we discuss various trends, from the increasing tendency to quantify to the rise of evidence-based medicine. PMID:26675654

  12. EOS distributed planning and scheduling prototype

    NASA Astrophysics Data System (ADS)

    Hull, Larry G.; Peters, Stephen F.; Davis, Randy

    Some of the more significant lessons learned during the development of the Earth Observing System (EOS) Distributed Planning and Scheduling Prototype are presented. The need for a central scheduler is not demonstrated. A mapping of scheduling and conflict-resolution responsibility across the nodes of the EOS distributed scheduling system is developed and shown to be both feasible and appropriate. Complex instrument scheduling is mostly accomplished at the ICC/IST (instrument control center/instrumental support terminal) with 'slidable' flexibility for slews and some kinds of calibrations resolved at the EOS Operations Center (EOC). All nodes have full visibility interinstrument contention for resource and environmental rights, e.g., vibration, thermal, and electromagnetic. The EOC assigns, by activity, initial action responsibility for conflict resolution to a node which is party to the conflict. Most interinstrument conflicts are resolved by the ICCs and ISTs during an intermediate scheduling phase while the EOC is negotiating a TDRS schedule with the NCC.

  13. EOS distributed planning and scheduling prototype

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.; Peters, Stephen F.; Davis, Randy

    1993-01-01

    Some of the more significant lessons learned during the development of the Earth Observing System (EOS) Distributed Planning and Scheduling Prototype are presented. The need for a central scheduler is not demonstrated. A mapping of scheduling and conflict-resolution responsibility across the nodes of the EOS distributed scheduling system is developed and shown to be both feasible and appropriate. Complex instrument scheduling is mostly accomplished at the ICC/IST (instrument control center/instrumental support terminal) with 'slidable' flexibility for slews and some kinds of calibrations resolved at the EOS Operations Center (EOC). All nodes have full visibility interinstrument contention for resource and environmental rights, e.g., vibration, thermal, and electromagnetic. The EOC assigns, by activity, initial action responsibility for conflict resolution to a node which is party to the conflict. Most interinstrument conflicts are resolved by the ICCs and ISTs during an intermediate scheduling phase while the EOC is negotiating a TDRS schedule with the NCC.

  14. Social Development and Feeding Milestones of Young Down Syndrome Children.

    ERIC Educational Resources Information Center

    And Others; Cullen, Susan M.

    1981-01-01

    The data revealed that young Down syndrome children attained significantly higher scores on the Vineland Social Maturity Scale and achieved most feeding milestones much earlier if they had no or only mild congenital heart disease, if their parents followed through appropriately with furnished guidance, and if they had "good" muscle tone. (Author)

  15. Apparatus as Milestones in the History of Comparative Psychology

    NASA Technical Reports Server (NTRS)

    Washburn, David A.; Rumbaugh, Duane M.; Putney, R. Thompson

    1994-01-01

    Significant apparatus developments from the history of comparative psychology are reviewed, including the contemporary trend toward computer use in research with nonhuman animals. It is argued that milestone apparatus served not only to open new lines of inquiry but also to shape or delimit the nature of the answers that were obtained.

  16. 10 CFR 603.1105 - Advance payments or payable milestones.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Advance payments or payable milestones. 603.1105 Section 603.1105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT... point is 44% ($40,000 out of the total $90,000 expended, with the balance provided by the...

  17. 10 CFR 603.1105 - Advance payments or payable milestones.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Advance payments or payable milestones. 603.1105 Section 603.1105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT... point is 44% ($40,000 out of the total $90,000 expended, with the balance provided by the...

  18. UDS Recovery Equipment Installation (AFCI CETE Milestone Report)

    SciTech Connect

    Jubin, Robert Thomas

    2009-06-01

    This letter documents the successful installation of the un-dissolved solids (UDS) recovery equipment into the hot-cell in building 7920 at ORNL. This installation (see Figure 1) satisfies the AFCI Level 4 milestone in the CETE Investments and Hot Cell Upgrades work package (OR0915020323) to 'Complete UDS recovery equipment installation' (M4502032306), due 30 June 09.

  19. 43 CFR 3930.30 - Diligent development milestones.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... conditions of the lease, POD, and these regulations. If the operator does not maintain or comply with...) Milestone 1. Within 2 years of the lease issuance date, submit to the proper BLM office an initial POD that meets the requirements of subpart 3931. The operator must revise the POD following subpart 3931, if...

  20. 43 CFR 3930.30 - Diligent development milestones.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... conditions of the lease, POD, and these regulations. If the operator does not maintain or comply with...) Milestone 1. Within 2 years of the lease issuance date, submit to the proper BLM office an initial POD that meets the requirements of subpart 3931. The operator must revise the POD following subpart 3931, if...

  1. 10 CFR 603.570 - Determining milestone payment amounts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Determining milestone payment amounts. 603.570 Section 603.570 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Accounting, Payments, and Recovery of Funds § 603.570...

  2. Toddlers’ Fine Motor Milestone Achievement Is Associated with Early Touchscreen Scrolling

    PubMed Central

    Bedford, Rachael; Saez de Urabain, Irati R.; Cheung, Celeste H. M.; Karmiloff-Smith, Annette; Smith, Tim J.

    2016-01-01

    Touchscreen technologies provide an intuitive and attractive source of sensory/cognitive stimulation for young children. Despite fears that usage may have a negative impact on toddlers’ cognitive development, empirical evidence is lacking. The current study presents results from the UK Toddler Attentional Behaviours and LEarning with Touchscreens (TABLET) project, examining the association between toddlers’ touchscreen use and the attainment of developmental milestones. Data were gathered in an online survey of 715 parents of 6- to 36-month-olds to address two research questions: (1) How does touchscreen use change from 6 to 36 months? (2) In toddlers (19–36 months, i.e., above the median age, n = 366), how does retrospectively reported age of first touchscreen usage relate to gross motor (i.e., walking), fine motor (i.e., stacking blocks), and language (i.e., producing two-word utterances) milestones? In our sample, the proportion of children using touchscreens, as well as the average daily usage time, increased with age (youngest quartile, 6–11 months: 51.22% users, 8.53 min per day; oldest quartile, 26–36 months: 92.05% users, average use of 43.95 min per day). In toddlers, aged 19–36 months, age of first touchscreen use was significantly associated with fine motor (stacking blocks), p = 0.03, after controlling for covariates age, sex, mother’s education (a proxy for socioeconomic status) as well as age of early fine motor milestone achievement (pincer grip). This effect was only present for active scrolling of the touchscreen p = 0.04, not for video watching. No significant relationships were found between touchscreen use and either gross motor or language milestones. Touchscreen use increases rapidly over the first 3 years of life. In the current study, we find no evidence to support a negative association between the age of first touchscreen usage and developmental milestones. Indeed, earlier touchscreen use, specifically scrolling of the screen

  3. Toddlers' Fine Motor Milestone Achievement Is Associated with Early Touchscreen Scrolling.

    PubMed

    Bedford, Rachael; Saez de Urabain, Irati R; Cheung, Celeste H M; Karmiloff-Smith, Annette; Smith, Tim J

    2016-01-01

    Touchscreen technologies provide an intuitive and attractive source of sensory/cognitive stimulation for young children. Despite fears that usage may have a negative impact on toddlers' cognitive development, empirical evidence is lacking. The current study presents results from the UK Toddler Attentional Behaviours and LEarning with Touchscreens (TABLET) project, examining the association between toddlers' touchscreen use and the attainment of developmental milestones. Data were gathered in an online survey of 715 parents of 6- to 36-month-olds to address two research questions: (1) How does touchscreen use change from 6 to 36 months? (2) In toddlers (19-36 months, i.e., above the median age, n = 366), how does retrospectively reported age of first touchscreen usage relate to gross motor (i.e., walking), fine motor (i.e., stacking blocks), and language (i.e., producing two-word utterances) milestones? In our sample, the proportion of children using touchscreens, as well as the average daily usage time, increased with age (youngest quartile, 6-11 months: 51.22% users, 8.53 min per day; oldest quartile, 26-36 months: 92.05% users, average use of 43.95 min per day). In toddlers, aged 19-36 months, age of first touchscreen use was significantly associated with fine motor (stacking blocks), p = 0.03, after controlling for covariates age, sex, mother's education (a proxy for socioeconomic status) as well as age of early fine motor milestone achievement (pincer grip). This effect was only present for active scrolling of the touchscreen p = 0.04, not for video watching. No significant relationships were found between touchscreen use and either gross motor or language milestones. Touchscreen use increases rapidly over the first 3 years of life. In the current study, we find no evidence to support a negative association between the age of first touchscreen usage and developmental milestones. Indeed, earlier touchscreen use, specifically scrolling of the screen, was

  4. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R.; Eckert, Philip D.; Hommes, Gregg

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  5. Organized Activity Participation, Positive Youth Development, and the Over-Scheduling Hypothesis. Social Policy Report. Volume 20, Number 4

    ERIC Educational Resources Information Center

    Mahoney, Joseph L.; Harris, Angel L.; Eccles, Jacquelynne S.

    2006-01-01

    There is increasing awareness that how young people spend their time outside of school has consequences for their development. As part of this awareness, interest in organized activities--extracurricular activities, after-school programs, and youth organizations--has grown markedly. On balance, the bulk of research on organized activities has…

  6. Immunization Schedules for Adults

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Adults in Easy-to-read Formats ... previous immunizations. View or Print a Schedule Recommended Immunizations for Adults (19 Years and Older) by Age ...

  7. Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  8. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  9. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  10. Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

    PubMed

    2014-08-22

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule II controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, conduct chemical analysis with, or possess) or propose to handle hydrocodone combination products. PMID:25167591

  11. Parallel scheduling algorithms

    SciTech Connect

    Dekel, E.; Sahni, S.

    1983-01-01

    Parallel algorithms are given for scheduling problems such as scheduling to minimize the number of tardy jobs, job sequencing with deadlines, scheduling to minimize earliness and tardiness penalties, channel assignment, and minimizing the mean finish time. The shared memory model of parallel computers is used to obtain fast algorithms. 26 references.

  12. Block Scheduling. Research Brief

    ERIC Educational Resources Information Center

    Muir, Mike

    2003-01-01

    What are the effects of block scheduling? Results of transitioning from traditional to block scheduling are mixed. Some studies indicate no change in achievement results, nor change in teachers' opinions about instructional strategies. Other studies show that block scheduling doesn't work well for Advanced Placement or Music courses, that "hard to…

  13. Analysis of alternatives for immobilized low activity waste disposal

    SciTech Connect

    Burbank, D.A.

    1997-10-28

    This report presents a study of alternative disposal system architectures and implementation strategies to provide onsite near-surface disposal capacity to receive the immobilized low-activity waste produced by the private vendors. The analysis shows that a flexible unit strategy that provides a suite of design solutions tailored to the characteristics of the immobilized low-activity waste will provide a disposal system that best meets the program goals of reducing the environmental, health, and safety impacts; meeting the schedule milestones; and minimizing the life-cycle cost of the program.

  14. The Role of Physical Activity and Feeding Schedule on the Kinetics of Inhaled and Oral Toluene in Rats

    EPA Science Inventory

    This manuscript provides new information regarding factors that affect the toxicokinetics of toluene, a hazardous air pollutant with acute neurotoxic activity. Toluene is a prototype compound of the class of volatile organic compounds (VOCs), which have similar CNS activity and k...

  15. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    NASA Technical Reports Server (NTRS)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  16. [Milestones of cardiovascular therapy. V. Diuretics].

    PubMed

    Jerie, P

    2007-01-01

    After their introduction in 1959, thiazide diuretics have become the cornerstone in the managment of heart failure and hypertension. They prevent sodium reabsorption in the upper segment of the distal tubule, increase the diuresis and, by diminishing the intravascular volume, they reduce the preload. With vigorous diuresis, cardiac output may drop under the critical level, and hypovolaemia, hypotension, syncopes and dehydratation with severe water-mineral disturbance may occur. A similar disorder takes place after aggressive administration of loop diuretics which act by the same mechanism at the ascending limb of the loop of Henle. Moreover, any chronic treatment with saluretics triggers the contraregulatory activation of RAAS. Thus, the dosing should be cautiously titrated, and with diminishing efficacy the diuretic is to be replaced by another one, or a second drug is to be added. With any potent diuretic agent, electrolyte depletion may occur; therefore, minimal active doses should be applied, potassium-sparing diuretics added or a pause should be inserted after/before furosemide with spirolactone. Hyponatraemia and hypokalaemia are common, and in combined treatment with ACE-inhibitors and spirolactone, hyperkalaemia is frequent. With long-term treatment, a rebound period of sodium reabsorption follows, and the diuretic effect is reduced or lost. To overcome this ",diuretic resistance", the dietary sodium is to be restricted, physical effort avoided and salt retaining drugs (NSAIDs and similar) eliminated. In the article, a short review of basic physiology concerning the water-electrolyte balance and the distribution of body-water is summarized. PMID:18069212

  17. Iterative modulo scheduling

    SciTech Connect

    Rau, B.R.

    1996-02-01

    Modulo scheduling is a framework within which algorithms for software pipelining innermost loops may be defined. The framework specifies a set of constraints that must be met in order to achieve a legal modulo schedule. A wide variety of algorithms and heuristics can be defined within this framework. Little work has been done to evaluate and compare alternative algorithms and heuristics for modulo scheduling from the viewpoints of schedule quality as well as computational complexity. This, along with a vague and unfounded perception that modulo scheduling is computationally expensive as well as difficult to implement, have inhibited its corporation into product compilers. This paper presents iterative modulo scheduling, a practical algorithm that is capable of dealing with realistic machine models. The paper also characterizes the algorithm in terms of the quality of the generated schedules as well as the computational incurred.

  18. Some Important Milestones in the Field of Blood Clotting.

    PubMed

    Doolittle, Russell F

    2016-01-01

    Several different kinds of 'milestone' in the field of blood coagulation are described from the middle decades of the 20th century. Although viewed from the standpoint of clotting per se, attention is also given to implications for innate immunity. The first milestone considered is the protracted saga of clotting dependence on vitamin K, an adventure that spanned more than five decades beginning in the 1920s. The second has to do with the discovery of a half-dozen 'new' clotting factors during the period immediately following World War II. A third pursues a narrower focus and examines the once mysterious transformation of fibrinogen into fibrin. Finally, the clinical treatment of classical hemophilia had a remarkable turning point in the 1960s as the result of simple but sensible measures. PMID:26667674

  19. Extracting the diffusion tensor from molecular dynamics simulation with Milestoning.

    PubMed

    Mugnai, Mauro L; Elber, Ron

    2015-01-01

    We propose an algorithm to extract the diffusion tensor from Molecular Dynamics simulations with Milestoning. A Kramers-Moyal expansion of a discrete master equation, which is the Markovian limit of the Milestoning theory, determines the diffusion tensor. To test the algorithm, we analyze overdamped Langevin trajectories and recover a multidimensional Fokker-Planck equation. The recovery process determines the flux through a mesh and estimates local kinetic parameters. Rate coefficients are converted to the derivatives of the potential of mean force and to coordinate dependent diffusion tensor. We illustrate the computation on simple models and on an atomically detailed system-the diffusion along the backbone torsions of a solvated alanine dipeptide. PMID:25573551

  20. Historical milestones of a long pathway.

    PubMed

    Roy, Thomas

    2011-01-01

    Hemodiafiltration (HDF), developed from the combination of hemodialysis and hemofiltration, is considered to be the most effective current procedure to remove uremic toxins from the blood of kidney patients. Historically, the clinical use of HDF was for many years limited due to the cost burden related to the large amount of sterile volume replacement fluid needed. The solution offered was on-line preparation of replacement fluid from standard dialysate by means of membrane filtration. Industry opened to this concept quite early and worked on various technical solutions between the early 1980s and the late 1990s before real state-of-the-art systems became commercially available on a broad basis. This article reviews in particular the activities of initially Fresenius and later Fresenius Medical Care in this field and identifies major concepts and prototypes up to today's commercially available high-end product--the 5008 therapy system--where on-line HDF finally became integrated as a standard component. PMID:22188683

  1. Nocistatin: milestone of one decade of research.

    PubMed

    Okuda-Ashitaka, Emiko; Ito, Seiji

    2015-01-01

    A neuropeptide nociceptin or orphanin FQ (N/OFQ) is an endogenous ligand for the orphan opioid receptor-like receptor. During studies on the analysis of the precursor of N/OFQ, we identified a novel neuropeptide produced from the same precursor and named it "nocistatin (NST)". Intrathecal (i.t.) administration of N/OFQ induces pain responses including touch-evoked allodynia and thermal hyperalgesia, and simultaneous administration of NST blocks the allodynia and hyperalgesia induced by N/OFQ. In the years since these discoveries, N/OFQ has been shown to be involved in a wide range of pharmacological activities, such as relaying pain perception in peripheral tissues, to the central nervous system, and NST was shown to have opposite effects on various central functions evoked by N/OFQ. Pharmacological characterization using various neurotransmitter agents, agonists, antagonists and knockout mice in vivo; electrophysiological and immunohistological analysis ex vivo; and molecular cloning using affinity chromatography of high-performance affinity nanobeads; and protein processing measurement using bioluminescence resonance energy transfer (BRET) in vitro have generated new insights into pain transmission regulated by NST and N/OFQ. This review focuses on the molecular and cellular mechanisms of pain transmission regulated by NST. PMID:25345611

  2. Milestone Report - M31SW030904 - Sigma Team Coordination Meeting

    SciTech Connect

    Jubin, Robert Thomas

    2010-11-24

    This documents the completion of the FCR&D Level 3 milestone for the Off-Gas Sigma Team - ORNL work package (FTOR11SW0309), “Sigma Team Coordination Meeting” (M31SW030904), due 30 November 10. The subject meeting was held at Idaho National Laboratory on October 12 and 13, 2010. The agenda and meeting minutes are attached to this memo.

  3. Teaching Children with Autism to Play a Video Game Using Activity Schedules and Game-Embedded Simultaneous Video Modeling

    ERIC Educational Resources Information Center

    Blum-Dimaya, Alyssa; Reeve, Sharon A.; Reeve, Kenneth F.; Hoch, Hannah

    2010-01-01

    Children with autism have severe and pervasive impairments in social interactions and communication that impact most areas of daily living and often limit independent engagement in leisure activities. We taught four children with autism to engage in an age-appropriate leisure skill, playing the video game Guitar Hero II[TM], through the use of (a)…

  4. Two Relations to Estimate Membrane Permeability Using Milestoning.

    PubMed

    Votapka, Lane W; Lee, Christopher T; Amaro, Rommie E

    2016-08-25

    Prediction of passive permeation rates of solutes across lipid bilayers is important to drug design, toxicology, and other biological processes such as signaling. The inhomogeneous solubility-diffusion (ISD) equation is traditionally used to relate the position-dependent potential of mean force and diffusivity to the permeability coefficient. The ISD equation is derived via the Smoluchowski equation and assumes overdamped system dynamics. It has been suggested that the complex membrane environment may exhibit more complicated damping conditions. Here we derive a variant of the inhomogeneous solubility diffusion equation as a function of the mean first passage time (MFPT) and show how milestoning, a method that can estimate kinetic quantities of interest, can be used to estimate the MFPT of membrane crossing and, by extension, the permeability coefficient. We further describe a second scheme, agnostic to the damping condition, to estimate the permeability coefficient from milestoning results or other methods that compute a probability of membrane crossing. The derived relationships are tested using a one-dimensional Langevin dynamics toy system confirming that the presented theoretical methods can be used to estimate permeabilities given simulation and milestoning results. PMID:27154639

  5. Historical milestones and discoveries that shaped the toxicology sciences.

    PubMed

    Hayes, Antoinette N; Gilbert, Steven G

    2009-01-01

    Knowledge of the toxic and healing properties of plants, animals, and minerals has shaped civilization for millennia. The foundations of modern toxicology are built upon the significant milestones and discoveries of serendipity and crude experimentation. Throughout the ages, toxicological science has provided information that has shaped and guided society. This chapter examines the development of the discipline of toxicology and its influence on civilization by highlighting significant milestones and discoveries related to toxicology. The examples shed light on the beginnings of toxicology, as well as examine lessons learned and re-learned. This chapter also examines how toxicology and the toxicologist have interacted with other scientific and cultural disciplines, including religion, politics, and the government. Toxicology has evolved to a true scientific discipline with its own dedicated scientists, educational institutes, sub-disciplines, professional societies, and journals. It now stands as its own entity while traversing such fields as chemistry, physiology, pharmacology, and molecular biology. We invite you to join us on a path of discovery and to offer our suggestions as to what are the most significant milestones and discoveries in toxicology. Additional information is available on the history section of Toxipedia (www.toxipedia.org). PMID:19157056

  6. Two Relations to Estimate Membrane Permeability Using Milestoning

    PubMed Central

    2016-01-01

    Prediction of passive permeation rates of solutes across lipid bilayers is important to drug design, toxicology, and other biological processes such as signaling. The inhomogeneous solubility-diffusion (ISD) equation is traditionally used to relate the position-dependent potential of mean force and diffusivity to the permeability coefficient. The ISD equation is derived via the Smoluchowski equation and assumes overdamped system dynamics. It has been suggested that the complex membrane environment may exhibit more complicated damping conditions. Here we derive a variant of the inhomogeneous solubility diffusion equation as a function of the mean first passage time (MFPT) and show how milestoning, a method that can estimate kinetic quantities of interest, can be used to estimate the MFPT of membrane crossing and, by extension, the permeability coefficient. We further describe a second scheme, agnostic to the damping condition, to estimate the permeability coefficient from milestoning results or other methods that compute a probability of membrane crossing. The derived relationships are tested using a one-dimensional Langevin dynamics toy system confirming that the presented theoretical methods can be used to estimate permeabilities given simulation and milestoning results. PMID:27154639

  7. Schedule-Organizer Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  8. [Milestones of cardivascular pharmacotherapy: salicylates and aspirin].

    PubMed

    Jerie, P

    2006-01-01

    The analgesic and antipyretic effect of the bark of willow has been known in Egypt and Greece for canturies. The modem era of salicylates starts with a letter sent 1758 by Reverend Edward Stone to The Royal Society in London. He described "an account of the success of the bark of willow in the cure of agues". His report. erroneously attributed to Edmond Stone. was published five years later. The active ingredient of willow bark. "salicine". was first isolated 1828 by Joseph Buchner, then by Henri Leroux, and also prepared from the oil of wintergreen (Gaultheria) and meadowsweet (Spirea ulmaria) by J. W. Lowig 1833. and called "Spirsäure", which was already pure acetylsalicylic acid. It was also synthetised 1853 by Ch. Gerhardt and finally 1897 in Bayer's laboratoires by Felix Hoffman, who also demonstrated its antiinflammatory efficacy. After two years of clinical trials with low doses, Bayer's management decided to start the productions and launched Aspirin as an analgetic worldwide in summer 1899. The first ASPIRIN ERA bagun. A completely new epoch started when J. N. Vane and Priscilla Piner demonstrated 1971 that the main mechanism of action of aspirin-like drugs is the inhibition of prostaglandin synthesis. In later studies the potency to inhibit platelet aggregation with small doses of aspirin (30-125 mg) was demonstrated. The Physicians'Health Study 1988 confirmed this effect: aspirin significantly reduced the risk of both, fatal and non-fatal myocardial infarction. and is now used in primary and secondary prevention of atherosclerosis. However the idea was not new: The use of salicylates and aspirin was throughly discussed more than 50 years ago: Paul C. Gibson published 1949 a well-documented case report on efficacy of aspirin in patients with angina, and Kl. Weber and P. Klein in Prague used Gibson's mixture successfully for patients with acute myocardial infarction (1951). Recently, the efficacy and security, the interactions and side-effects of low

  9. The scheduling techniques of ESP2

    NASA Technical Reports Server (NTRS)

    Jaap, John P.; Davis, Elizabeth K.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center has developed a robust automatic scheduler which can produce detailed schedules for the multi-step activities required for payload operations on the Space Station. This scheduler, a part of the Expert Scheduling Program (ESP2), has five components: the bookkeeper, checker, loader, selector, and explainer. The bookkeeper maintains the usage profiles for nondepletable resources, consumables, equipment, crew, and the times of all the steps for the payload activities for several different schedules simultaneously. The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system that uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating constraints (such as crew, resources, and orbit opportunities). The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system which uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating the constraints. The selector has several methods of choosing the next activity for the loader to schedule. The explainer shows the user why an activity was or was not scheduled at a certain time; it offers a unique graphical explanation of how the expert system (the loader) works.

  10. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  11. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  12. Automated telescope scheduling

    NASA Astrophysics Data System (ADS)

    Johnston, Mark D.

    1988-08-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  13. Achieving reutilization of scheduling software through abstraction and generalization

    NASA Technical Reports Server (NTRS)

    Wilkinson, George J.; Monteleone, Richard A.; Weinstein, Stuart M.; Mohler, Michael G.; Zoch, David R.; Tong, G. Michael

    1995-01-01

    Reutilization of software is a difficult goal to achieve particularly in complex environments that require advanced software systems. The Request-Oriented Scheduling Engine (ROSE) was developed to create a reusable scheduling system for the diverse scheduling needs of the National Aeronautics and Space Administration (NASA). ROSE is a data-driven scheduler that accepts inputs such as user activities, available resources, timing contraints, and user-defined events, and then produces a conflict-free schedule. To support reutilization, ROSE is designed to be flexible, extensible, and portable. With these design features, applying ROSE to a new scheduling application does not require changing the core scheduling engine, even if the new application requires significantly larger or smaller data sets, customized scheduling algorithms, or software portability. This paper includes a ROSE scheduling system description emphasizing its general-purpose features, reutilization techniques, and tasks for which ROSE reuse provided a low-risk solution with significant cost savings and reduced software development time.

  14. Certification of Completion of Level-2 Milestone 461: Deploy First Phase of I/O Infrastructure for Purple

    SciTech Connect

    Gary, M; Wiltzius, D

    2005-11-17

    This report describes the deployment and demonstration of the first phase of the I/O infrastructure for Purple. The report and the references herein are intended to certify the completion of the following Level 2 Milestone from the ASC FY04-05 Implementation Plan, due at the end of Quarter 4 in FY05. The milestone is defined as follows: ''External networking infrastructure installation and performance analysis will be completed for the initial delivery of Purple. The external networking infrastructure includes incorporation of a new 10 Gigabit Ethernet fabric linking the platform to the LLNL High Performance Storage System (HPSS) and other center equipment. The LLNL archive will be upgraded to HPSS Release 5.1 to support the requirements of the machine and performance analysis will be completed using the newly deployed I/O infrastructure. Demonstrated throughput to the archive for this infrastructure will be a minimum of 1.5GB/s with a target of 3GB/s. Since Purple delivery is not scheduled until late Q3, demonstration of these performance goals will use parts of Purple and/or an aggregate of other existing resources.''

  15. Application of two-phase flow modeling as a basis for scheduling corrosion maintenance activities in wet sour gas pipelines

    SciTech Connect

    Richardson, D.; Bich, N.N.

    1997-08-01

    Pipeline failures attributed to internal corrosion in the oil and gas producing industry have not been decreasing despite the many corrosion mitigation, monitoring and inspection programs implemented. This paper describes how preliminary investigations for evaluating the susceptibility of internal corrosion for wet sour gas pipelines have been based on integrating the latest knowledge in fluid flow and sour gas corrosion mechanisms. It is anticipated future efforts to correlate the onset of slug flow regime with historical corrosion and inspection data may lead to development of an improved criteria for predicting the onset of corrosive water traps and for triggering appropriate maintenance activities. This paper provides details of two corrosion failure Case Studies where application of flow modeling has improved the understanding of the operating hazards that contributed to the formation of a corrosive environment leading to high-rate initiation and growth of localized pitting corrosion. Preliminary analysis indicates slug flow pattern, and long water residence time of water within stagnant traps increases the likelihood of pitting corrosion.

  16. Transportation Baseline Schedule

    SciTech Connect

    Fawcett, Ricky Lee; John, Mark Earl

    2000-01-01

    The “1999 National Transportation Program - Transportation Baseline Report” presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion “1999 Transportation ‘Barriers’ Analysis” analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The “1999 Transportation Baseline Schedule” (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the “Geologic Repository Disposal” site (GRD).

  17. 324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05)

    SciTech Connect

    Hobart, R.L.

    1998-05-12

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05 requires US Department of Energy, Richland Operations Office to complete a 324 Building Special Case Waste Assessment in Support of the 324 Building Closure. This document has been prepared with the intent of meeting this regulatory commitment. Alternatives for the Special Case Wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel.

  18. 10 CFR 2.334 - Implementing hearing schedule for proceeding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... schedule established by the presiding officer in accordance with 10 CFR 2.332(a) of this part for the... activities in the hearing schedule established by the presiding officer under 10 CFR 2.332(a), or that the... beyond the time specified in the hearing schedule established under 10 CFR 2.332(a). The...

  19. 10 CFR 2.334 - Implementing hearing schedule for proceeding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... schedule established by the presiding officer in accordance with 10 CFR 2.332(a) of this part for the... activities in the hearing schedule established by the presiding officer under 10 CFR 2.332(a), or that the... beyond the time specified in the hearing schedule established under 10 CFR 2.332(a). The...

  20. 10 CFR 30.70 - Schedule A-Exempt concentrations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MATERIAL Schedules § 30.70 Schedule A—Exempt concentrations. Element (atomic number) Isotope Col. I Gas...: Many radioisotopes disintegrate into isotopes which are also radioactive. In expressing the concentrations in Schedule A, the activity stated is that of the parent isotope and takes into account...

  1. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  2. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  3. Scheduling lessons learned from the Autonomous Power System

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  4. The EUVE proposal database and scheduling system

    NASA Technical Reports Server (NTRS)

    Christian, C.; Olson, E.; Jelinsky, P.; Samuel, M.

    1992-01-01

    The proposal database and scheduling system for the Extreme Ultraviolet Explorer will be described. The proposal database has been implemented to take input for approved observations selected by the EUVE Peer Review Panel and output target information suitable for the scheduling system to digest. The scheduling system is a hybrid of the SPIKE program and EUVE software which checks spacecraft constraints, produces a proposed schedule and selects spacecraft orientations with optimal configurations for acquiring star trackers, etc. This system has been used to schedule the In Orbit Calibration activities that took place this summer, following the EUVE launch in early June 1992. The implemented strategy has implications for the selection of approved targets, which have impacted the Peer Review process. In addition, it will be discussed how the proposal database, founded on Sybase, controls the processing of EUVE Guest Observer data.

  5. Range Scheduling Aid (RSA)

    NASA Technical Reports Server (NTRS)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  6. Surviving Block Scheduling.

    ERIC Educational Resources Information Center

    Haley, Marjorie

    A discussion of block scheduling for second language instruction looks at the advantages and disadvantages and offers some suggestions for classroom management and course organization. It is argued that block scheduling may offer a potential solution to large classes, insufficient time for labs, too little individualized instruction; few…

  7. Block Scheduling Revisited.

    ERIC Educational Resources Information Center

    Queen, J. Allen

    2000-01-01

    Successful block scheduling depends on provision of initial and ongoing instructional training. Teaching strategies should vary and include cooperative learning, the case method, the socratic seminar, synectics, concept attainment, the inquiry method, and simulations. Recommendations for maximizing block scheduling are outlined. (Contains 52…

  8. A Fluid Block Schedule

    ERIC Educational Resources Information Center

    Ubben, Gerald C.

    1976-01-01

    Achieving flexibility without losing student accountability is a challenge that faces every school. With a fluid block schedule, as described here, accountability is maintained without inhibiting flexibility. An additional advantage is that three levels of schedule decision making take some of the pressure off the principal. (Editor)

  9. Scheduling: Seven Period Day

    ERIC Educational Resources Information Center

    Williamson, Ronald

    2010-01-01

    Driven by stable or declining financial resources many school districts are considering the costs and benefits of a seven-period day. While there is limited evidence that any particular scheduling model has a greater impact on student learning than any other, it is clear that the school schedule is a tool that can significantly impact teacher…

  10. Trimester Schedule. Research Brief

    ERIC Educational Resources Information Center

    Education Partnerships, Inc., 2012

    2012-01-01

    Why do a trimester schedule? With the advent of block scheduling, many high schools conducted research on utilizing that plan in a trimester format. There appeared to be three issues that most schools faced: (1) How to provide substantive instructional time that was not fragmented?; (2) How does the school climate contribute positively to…

  11. Analyzing milestoning networks for molecular kinetics: Definitions, algorithms, and examples

    NASA Astrophysics Data System (ADS)

    Viswanath, Shruthi; Kreuzer, Steven M.; Cardenas, Alfredo E.; Elber, Ron

    2013-11-01

    Network representations are becoming increasingly popular for analyzing kinetic data from techniques like Milestoning, Markov State Models, and Transition Path Theory. Mapping continuous phase space trajectories into a relatively small number of discrete states helps in visualization of the data and in dissecting complex dynamics to concrete mechanisms. However, not only are molecular networks derived from molecular dynamics simulations growing in number, they are also getting increasingly complex, owing partly to the growth in computer power that allows us to generate longer and better converged trajectories. The increased complexity of the networks makes simple interpretation and qualitative insight of the molecular systems more difficult to achieve. In this paper, we focus on various network representations of kinetic data and algorithms to identify important edges and pathways in these networks. The kinetic data can be local and partial (such as the value of rate coefficients between states) or an exact solution to kinetic equations for the entire system (such as the stationary flux between vertices). In particular, we focus on the Milestoning method that provides fluxes as the main output. We proposed Global Maximum Weight Pathways as a useful tool for analyzing molecular mechanism in Milestoning networks. A closely related definition was made in the context of Transition Path Theory. We consider three algorithms to find Global Maximum Weight Pathways: Recursive Dijkstra's, Edge-Elimination, and Edge-List Bisection. The asymptotic efficiency of the algorithms is analyzed and numerical tests on finite networks show that Edge-List Bisection and Recursive Dijkstra's algorithms are most efficient for sparse and dense networks, respectively. Pathways are illustrated for two examples: helix unfolding and membrane permeation. Finally, we illustrate that networks based on local kinetic information can lead to incorrect interpretation of molecular mechanisms.

  12. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  13. Hydrogen milestone could help lower fossil fuel refining costs

    SciTech Connect

    McGraw, Jennifer

    2009-01-01

    Hydrogen researchers at the U.S. Department of Energy's Idaho National Laboratory have reached another milestone on the road to reducing carbon emissions and protecting the nation against the effects of peaking world oil production. Stephen Herring, laboratory fellow and technical director of the INL High Temperature Electrolysis team, today announced that the latest fuel cell modification has set a new mark in endurance. The group's Integrated Laboratory Scale experiment has now operated continuously for 2,583 hours at higher efficiencies than previously attained. Learn more about INL research at http://www.facebook.com/idahonationallaboratory.

  14. Hydrogen milestone could help lower fossil fuel refining costs

    ScienceCinema

    McGraw, Jennifer

    2013-05-28

    Hydrogen researchers at the U.S. Department of Energy's Idaho National Laboratory have reached another milestone on the road to reducing carbon emissions and protecting the nation against the effects of peaking world oil production. Stephen Herring, laboratory fellow and technical director of the INL High Temperature Electrolysis team, today announced that the latest fuel cell modification has set a new mark in endurance. The group's Integrated Laboratory Scale experiment has now operated continuously for 2,583 hours at higher efficiencies than previously attained. Learn more about INL research at http://www.facebook.com/idahonationallaboratory.

  15. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  16. Mixed-Integer Formulations for Constellation Scheduling

    NASA Astrophysics Data System (ADS)

    Valicka, C.; Hart, W.; Rintoul, M.

    Remote sensing systems have expanded the set of capabilities available for and critical to national security. Cooperating, high-fidelity sensing systems and growing mission applications have exponentially increased the set of potential schedules. A definitive lack of advanced tools places an increased burden on operators, as planning and scheduling remain largely manual tasks. This is particularly true in time-critical planning activities where operators aim to accomplish a large number of missions through optimal utilization of single or multiple sensor systems. Automated scheduling through identification and comparison of alternative schedules remains a challenging problem applicable across all remote sensing systems. Previous approaches focused on a subset of sensor missions and do not consider ad-hoc tasking. We have begun development of a robust framework that leverages the Pyomo optimization modeling language for the design of a tool to assist sensor operators planning under the constraints of multiple concurrent missions and uncertainty. Our scheduling models have been formulated to address the stochastic nature of ad-hoc tasks inserted under a variety of scenarios. Operator experience is being leveraged to select appropriate model objectives. Successful development of the framework will include iterative development of high-fidelity mission models that consider and expose various schedule performance metrics. Creating this tool will aid time-critical scheduling by increasing planning efficiency, clarifying the value of alternative modalities uniquely provided by multi-sensor systems, and by presenting both sets of organized information to operators. Such a tool will help operators more quickly and fully utilize sensing systems, a high interest objective within the current remote sensing operations community. Preliminary results for mixed-integer programming formulations of a sensor scheduling problem will be presented. Assumptions regarding sensor geometry

  17. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  18. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  19. Culture perfusion schedules influence the metabolic activity and granulocyte-macrophage colony-stimulating factor production rates of human bone marrow stromal cells.

    PubMed

    Caldwell, J; Palsson, B O; Locey, B; Emerson, S G

    1991-05-01

    The metabolic function and GM-CSF production rates of adherent human bone marrow stromal cells were investigated as functions of medium and serum feeding rates. A range of medium exchange schedules was studied, ranging from a typical Dexter culture protocol of one weekly medium exchange to a full media exchange daily, which more closely approximates what bone marrow cells experience in situ. Glucose consumption was found to be significantly higher at full daily exchange rate than at any other exchange schedule examined. However, the lactate yield on glucose was a constant, at 1.8 mol/mol, under all conditions considered. Differential serum vs. medium exchange experiment showed that both serum supply and medium nutrients were responsible for the altered behavior at high exchange rates. Glutamine consumption was found to be insignificant under all culture conditions examined. A change in exchange schedule from 50% daily medium exchange to full daily medium exchange after 14 days of culture was found to result in a transient production of GM-CSF and a change in metabolic behavior to resemble that of cultures which had full daily exchange from day one. These results suggest that both stromal cell metabolism and GM-CSF production are sensitive to medium exchange schedules. Taken together, the data presented indicate that attempts to model the function of human bone marrow in vitro may be well served by beginning with medium exchange schedules that more closely mimic the in vivo physiologic state of bone marrow. PMID:2040665

  20. Where do we go from here? Moving from systems-based practice process measures to true competency via developmental milestones

    PubMed Central

    Martinez, Johanna; Phillips, Erica; Harris, Christina

    2014-01-01

    For many educators it has been challenging to meet the Accreditation Council for Graduate Medical Education's requirements for teaching systems-based practice (SBP). An additional layer of complexity for educators is evaluating competency in SBP, despite milestones and entrustable professional activities (EPAs). In order to address this challenge, the authors present the results of a literature review for how SBP is currently being taught and a series of recommendations on how to achieve competency in SBP for graduate medical trainees with the use of milestones. The literature review included 29 articles and demonstrated that only 28% of the articles taught more than one of the six core principles of SBP in a meaningful way. Only 7% of the articles received the highest grade of A. The authors summarize four guiding principles for creating a competency-based curriculum that is in alignment with the Next Accreditation System (NAS): 1) the curriculum needs to include all of the core principles in that competency, 2) the objectives of the curriculum should be driven by clinical outcomes, 3) the teaching modalities need to be interactive and clinically relevant, and 4) the evaluation process should be able to measure competency and be directly reflective of pertinent milestones and/or EPAs. This literature review and the provided guiding principles can guide other residency educators in their development of competency-based curricula that meets the standards of the NAS. PMID:24974832

  1. Scheduling and Utilization.

    ERIC Educational Resources Information Center

    Blakesley, James F.

    1982-01-01

    College scheduling system and operating procedure objectives influence efficient use of resources. Theoretical and practical considerations are outlined, including a step-by-step assessment of an institution's enrollment capacity and discussion of centralized or reassignable classrooms. (Author/MSE)

  2. Childhood Vaccine Schedule

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  3. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Grego

    2004-01-01

    Schedule Risk Assessment (SRA) determines the probability of finishing on or before a given point in time. This viewgraph presentation introduces the prerequisites, probability distribution curves, special conditions, calculations, and results analysis for SRA.

  4. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2005-01-01

    We investigate missions where communications resources are limited, requiring autonomous planning and execution. Unlike typical networks, spacecraft networks are also suited to automated planning and scheduling because many communications can be planned in advance.

  5. Initial Hardware Development Schedule

    NASA Technical Reports Server (NTRS)

    Culpepper, William X.

    1991-01-01

    The hardware development schedule for the Common Lunar Lander's (CLLs) tracking system is presented. Among the topics covered are the following: historical perspective, solution options, industry contacts, and the rationale for selection.

  6. US Department of Energy Office of Civilian Radioactive Waste Management quarterly report on program cost and schedule; First quarter, FY 1992

    SciTech Connect

    1992-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical current cost profiles (extracted from the DOE Financial Information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through December 1991.

  7. Prototype resupply scheduler

    NASA Technical Reports Server (NTRS)

    Tanner, Steve; Hughes, Angi; Byrd, Jim

    1987-01-01

    Resupply scheduling for the Space Station presents some formidable logistics problems. One of the most basic problems is assigning supplies to a series of shuttle resupply missions. A prototype logistics expert system which constructs resupply schedules was developed. This prototype is able to reconstruct feasible resupply plans. In addition, analysts can use the system to evaluate the impact of adding, deleting or modifying launches, cargo space, experiments, etc.

  8. A Picture-Based Activity Schedule Intervention to Teach Adults with Mild Intellectual Disability to Use an iPad during a Leisure Activity

    ERIC Educational Resources Information Center

    Chan, Jeffrey Michael; Lambdin, Lindsay; Graham, Kimberly; Fragale, Christina; Davis, Tonya

    2014-01-01

    Individuals with developmental disabilities have limited opportunities to participate in leisure activities, frequently due to lack of skills. The purpose of the current study was to teach three adults diagnosed with mild intellectual disability to use an iPad in the context of playing the video game Angry Birds. We used an adapted multiple…

  9. JWST planning and scheduling operations and concepts

    NASA Astrophysics Data System (ADS)

    Kinzel, Wayne M.

    2010-07-01

    The James Webb Space Telescope (JWST) will be a large infrared space observatory in orbit about the Sun-Earth second Lagrange Point. This paper provides an overview of the expected operational requirements imposed by the observatory's basic science activities (imaging, spectroscopy, coronography) and the operational issues associated with interleaving periodic engineering activities (Wave Front Sensing & Control activities, Momentum Unloads, and orbit Station Keeping) with the science observations. The planning and scheduling operations must maximize the overall science integration time while meeting the mission and observer specified constraints. The "Observation," "Visit," and Observation Template constructs are explained in the context of providing an interface to the Observer that provides the ability to specify complex observations, such as mosaics and cluster targets, while also minimizing specification errors and allowing planning and scheduling flexibility of the observations. The expected nominal planning and scheduling process including the creation and maintenance of the Long Range Plan (~1.25 year duration), the Short Term Schedules (~ three weeks), and the on-board Observation Plan (< 10 days) is described. The event-driven on-board operations of JWST and how the planning and scheduling process monitors and reacts to the onboard execution of the Observation Plan are described. Finally, the methods employed to allow for robust interfacing of scheduled real-time operations (for example, Station Keeping) with the Observation Plan and unplanned, but expected, modifications to the Observation Plan (for example, Target of Opportunity) are described.

  10. A space station onboard scheduling assistant

    NASA Technical Reports Server (NTRS)

    Brindle, A. F.; Anderson, B. H.

    1988-01-01

    One of the goals for the Space Station is to achieve greater autonomy, and have less reliance on ground commanding than previous space missions. This means that the crew will have to take an active role in scheduling and rescheduling their activities onboard, perhaps working from preliminary schedules generated on the ground. Scheduling is a time intensive task, whether performed manually or automatically, so the best approach to solving onboard scheduling problems may involve crew members working with an interactive software scheduling package. A project is described which investigates a system that uses knowledge based techniques for the rescheduling of experiments within the Materials Technology Laboratory of the Space Station. Particular attention is paid to: (1) methods for rapid response rescheduling to accommodate unplanned changes in resource availability, (2) the nature of the interface to the crew, (3) the representation of the many types of data within the knowledge base, and (4) the possibility of applying rule-based and constraint-based reasoning methods to onboard activity scheduling.

  11. Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment

    SciTech Connect

    Long, J W; Frank, R J; Brugger, E; Louis, S

    2004-07-28

    This summary report describes data management and visualization activities in the Advanced Simulation and Computing (ASC) program at Lawrence Livermore National Laboratory (LLNL). The report covers the period from approximately October 2003 to June 2004 and describes activities within the Visual Interactive Environment for Weapons Simulation (VIEWS) ASC program element. This report and the references herein are intended to document the completion of the following Level 2 Milestone from the ASC FY04-05 Implementation Plan, due at the end of Quarter 3 in FY04:

  12. Advanced Initiation Systems Manufacturing Level 2 Milestone Completion Summary

    SciTech Connect

    Chow, R; Schmidt, M

    2009-10-01

    Milestone Description - Advanced Initiation Systems Detonator Design and Prototype. Milestone Grading Criteria - Design new generation chip slapper detonator and manufacture a prototype using advanced manufacturing processes, such as all-dry chip metallization and solvent-less flyer coatings. The advanced processes have been developed for manufacturing detonators with high material compatibility and reliability to support future LEPs, e.g. the B61, and new weapons systems. Perform velocimetry measurements to determine slapper velocity as a function of flight distance. A prototype detonator assembly and stripline was designed for low-energy chip slappers. Pictures of the prototype detonator and stripline are shown. All-dry manufacturing processes were used to address compatibility issues. KCP metallized the chips in a physical vapor deposition system through precision-aligned shadow masks. LLNL deposited a solvent-less polyimide flyer with a processes called SLIP, which stands for solvent-less vapor deposition followed by in-situ polymerization. LANL manufactured the high-surface-area (HSA) high explosive (HE) pellets. Test fires of two chip slapper designs, radius and bowtie, were performed at LLNL in the High Explosives Application Facility (HEAF). Test fires with HE were conducted to establish the threshold firing voltages. pictures of the chip slappers before and after test fires are shown. Velocimetry tests were then performed to obtain slapper velocities at or above the threshold firing voltages. Figure 5 shows the slapper velocity as a function of distance and time at the threshold voltage, for both radius and bowtie bridge designs. Both designs were successful at initiating the HE at low energy levels. Summary of Accomplishments are: (1) All-dry process for chip manufacture developed; (2) Solventless process for slapper materials developed; (3) High-surface area explosive pellets developed; (4) High performance chip slappers developed; (5) Low-energy chip

  13. Certification of Completion of Item 2 of ASC FY07 Level-2 Milestone ID #2380

    SciTech Connect

    Lipari, D A

    2007-03-28

    This report documents the completion of Item 2 of the three milestone deliverables that comprise Milestone ID 2380: Deploy selected Tri-Lab resource manager at LLNL and develop support model. Specifically: LLNL will integrate and support a commercial resource manager software product at LLNL to be used across the tri-lab HPC facilities.

  14. Specialty milestones and the next accreditation system: an opportunity for the simulation community.

    PubMed

    Beeson, Michael S; Vozenilek, John A

    2014-06-01

    The Accreditation for Graduate Medical Education has developed a new process of accreditation, the Next Accreditation System (NAS), which focuses on outcomes. A key component of the NAS is specialty milestones-specific behavior, attributes, or outcomes within the general competency domains. Milestones will mark a level of proficiency of a resident within a competency domain. Each specialty has developed its own set of milestones, with semiannual reporting to begin July 2013, for 7 specialties, and the rest in July 2014.Milestone assessment must be based on objective data. Each specialty will determine optimal methods of measuring milestones, based on ease, cost, validity, and reliability. The simulation community has focused many graduate medical education efforts at training and formative assessment. Milestone assessment represents an opportunity for simulation modalities to offer summative assessment of milestone proficiencies, adding to the potential methods that residency programs will likely use or adapt. This article discusses the NAS, milestone assessment, and the opportunity to the simulation community to become involved in this next stage of graduate medical education assessment. PMID:24614793

  15. A format for the interchange of scheduling models

    NASA Technical Reports Server (NTRS)

    Jaap, John P.; Davis, Elizabeth K.

    1994-01-01

    In recent years a variety of space-activity schedulers have been developed within the aerospace community. Space-activity schedulers are characterized by their need to handle large numbers of activities which are time-window constrained and make high demands on many scarce resources, but are minimally constrained by predecessor/successor requirements or critical paths. Two needs to exchange data between these schedulers have materialized. First, there is significant interest in comparing and evaluating the different scheduling engines to ensure that the best technology is applied to each scheduling endeavor. Second, there is a developing requirement to divide a single scheduling task among different sites, each using a different scheduler. In fact, the scheduling task for International Space Station Alpha (ISSA) will be distributed among NASA centers and among the international partners. The format used to interchange scheduling data for ISSA will likely use a growth version of the format discussed in this paper. The model interchange format (or MIF, pronounced as one syllable) discussed in this paper is a robust solution to the need to interchange scheduling requirements for space activities. It is highly extensible, human-readable, and can be generated or edited with common text editors. It also serves well the need to support a 'benchmark' data case which can be delivered on any computer platform.

  16. PLAN-IT: Scheduling assistant for solar system exploration

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Henricks, Julia A.; Wong, Jennifer C.

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.

  17. PLAN-IT - Scheduling assistant for solar system exploration

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Henricks, Julia A.; Wong, Jennifer C.

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.

  18. Effect of Uncertainty on Deterministic Runway Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2012-01-01

    Active runway scheduling involves scheduling departures for takeoffs and arrivals for runway crossing subject to numerous constraints. This paper evaluates the effect of uncertainty on a deterministic runway scheduler. The evaluation is done against a first-come- first-serve scheme. In particular, the sequence from a deterministic scheduler is frozen and the times adjusted to satisfy all separation criteria; this approach is tested against FCFS. The comparison is done for both system performance (throughput and system delay) and predictability, and varying levels of congestion are considered. The modeling of uncertainty is done in two ways: as equal uncertainty in availability at the runway as for all aircraft, and as increasing uncertainty for later aircraft. Results indicate that the deterministic approach consistently performs better than first-come-first-serve in both system performance and predictability.

  19. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  20. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  1. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  2. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  3. Schedule-Tracker Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Tracker provides effective method for tracking tasks "past due" and/or "near term". Generates reports for each responsible staff member having one or more assigned tasks falling within two listed categories. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  4. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  5. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  6. Milestones in Medical Research, The Human Genome and ClinicalTrials.gov | NIH MedlinePlus the Magazine

    MedlinePlus

    ... turn Javascript on. Milestones in Medical Research, The Human Genome and ClinicalTrials.gov Past Issues / Fall 2010 ... milestone in understanding the genetic foundation of all human beings; the second, a comprehensive information service to ...

  7. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  8. NASA revises shuttle schedule

    NASA Astrophysics Data System (ADS)

    Wainger, Lisa A.

    The new schedule for Space Shuttle missions and expendable launch vehicles (ELV's) calls for a 7-month delay in sending up the Hubble Space Telescope. NASA was forced to put off launching the telescope until February 1990 to keep the Magellan and Galileo missions within their narrow launch windows. The first post-Challenger shuttle launch is now scheduled for late this month. Discovery's most recent delays were due to a hydrogen leak discovered July 29 that has still not been corrected and an engine valve malfunction during an August 4 test fire.

  9. Intelligent retail logistics scheduling

    SciTech Connect

    Rowe, J.; Jewers, K.; Codd, A.; Alcock, A.

    1996-12-31

    The Supply Chain Integrated Ordering Network (SCION) Depot Bookings system automates the planning and scheduling of perishable and non-perishable commodities and the vehicles that carry them into J. Sainsbury depots. This is a strategic initiative, enabling the business to make the key move from weekly to daily ordering. The system is mission critical, managing the inwards flow of commodities from suppliers into J. Sainsbury`s depots. The system leverages Al techniques to provide a business solution that meets challenging functional and performance needs. The SCION Depot Bookings system is operational providing schedules for 22 depots across the UK.

  10. Multiple daily fractionation schedules

    SciTech Connect

    Peschel, R.E.; Fischer, J.J.

    1982-10-01

    Although conventional fractionation schedules have been satisfactory for the treatment of some tumors, there is reason to believe that the results of radiation therapy could be improved in some cases by appropriate alterations in treatment schedules. The pharmacological characteristics of some of the electron affinic radiation sensitizers have provided added incentive to investigate newer fractionation schemes, particularly ones which deliver the majority of the radiation dose in short periods of time. This editorial discusses three papers describing preliminary clinical studies using multi-daily fractionated (MDF) radiation therapy. Two of these studies also make use of the radiation sensitizer misonidazole. (KRM)

  11. CMS multicore scheduling strategy

    SciTech Connect

    Perez-Calero Yzquierdo, Antonio; Hernandez, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  12. CMS multicore scheduling strategy

    NASA Astrophysics Data System (ADS)

    Pérez-Calero Yzquierdo, Antonio; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison; Cms Collaboration

    2014-06-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue "Moore's Law" style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  13. "Creative" Work Schedules.

    ERIC Educational Resources Information Center

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  14. Parent Interview Schedule.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN. Educational Research Center.

    This 116-item interview schedule designed for parents who failed to respond to the Questionnaire for Parents, is individually administered to the mother of the child of elementary school age. It consists of scales measuring 14 parent variables plus a section devoted to demographic variables: (1) parent's achievement aspirations for the child, (2)…

  15. Schedule-Induced Stereotypy.

    ERIC Educational Resources Information Center

    Emerson, Eric; Howard, Denise

    1992-01-01

    The phenomena of the induction and entrainment of adjunctive behaviors was investigated in 8 people (ages 5-51) with severe or profound mental retardation who exhibited stereotypic behaviors. Seven of the eight demonstrated evidence of schedule-induced stereotypic behavior, whereas five also showed evidence of the entrainment of these behaviors by…

  16. Geo-Informatics in India: Major Milestones and Present Scenario

    NASA Astrophysics Data System (ADS)

    Gupta, S.; Karnatak, H.; Raju, P. L. N.

    2016-06-01

    Geo-informatics has emerged globally as a useful tool to address spatial problems with significant societal implications that require integrative and innovative approaches for analysis, modelling, managing, and archiving of extensive and diverse data sets. Breakneck technological development and availability of satellite based data and information services in public domain along with real time geo-data n through participatory approaches, in the two last decades have led to a sea-change in our know-how of our natural resources and their effective management at various levels. It has led to a realization that every phenomena and requirement in our day to day life has some spatial, or geographic component that can be predicted and governed more effectively through geoinformatics tool. India also has come a long way in effective utilization of geoinformatics for various applications. This quantum leap owes its foundation in a humble beginning about half century back and almost parallel developments in the country's space programme to a current level where it touches almost all areas of life and living. Though geoinformatics technology (GIT) is believed to reach satisfactory level in the country, Indian geospatial community faces critical challenges with respect to research, education and training along with enhanced the access to the stakeholders and mobilization of the workforce, that are crucial in further penetration of this technology in context to India's development. In this paper we have critically reviewed milestones of GI development and its current utilization status in Indian context.

  17. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  18. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  19. A system for optimizing the scheduling and blending of crudes

    SciTech Connect

    Cutting, G.A.G.; Haverly, C.A.

    1995-09-01

    Operational scheduling within the downstream oil industry covers a wide range of tasks and decision making activities which have traditionally been undertaken with little or no assistance from specialized decision support tools. HSI has recently addressed this software gap and has developed scheduling decision support systems aimed specifically at the needs of the operational scheduler. In this paper the authors discuss the potential application of this software to crude oil scheduling covering pipeline delivery, terminal operations and optimized blending for feed to topping units. In addition HSI`s new scheduling software can be configured for use in refinery process unit scheduling, product blending and product distribution giving comprehensive cover to all aspects of downstream oil scheduling activities. The main scheduling system has been designed as a modular one so that the appropriate level of system complexity can be installed for any given application and to allow for stagewise implementation. The modules include a short term optimization module using Linear and/or Mixed Integer Programming techniques, a rule based Expert System decision generation module, a comprehensive event based operations simulation module and full graphic and text reporting modules. It is designed for network applications so that a number of schedulers can use the same system for individual tasks sharing data and other elements of the system to produce a fully integrated operating schedule. Substantial financial benefits should come from the improved ability of the schedulers to recover from the wide range of operational disturbances that routinely affect operations, the ability to perform What If studies to improve operating schedules and a faster response to commercial opportunities that regularly arise. Estimates are that a fully functioning operations scheduling system designed specifically for the job should pay for itself in no more than one year.

  20. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  1. Empirical results on scheduling and dynamic backtracking

    NASA Technical Reports Server (NTRS)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  2. State-based scheduling: An architecture for telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1989-01-01

    The applicability of constraint-based scheduling, a methodology previously developed and validated in the domain of factory scheduling, is extended to problem domains that require attendance to a wider range of state-dependent constraints. The problem of constructing and maintaining a short-term observation schedule for the Hubble Space Telescope (HST), which typifies this type of domain is the focus of interest. The nature of the constraints encountered in the HST domain is examined, system requirements are discussed with respect to utilization of a constraint-based scheduling methodology in such domains, and a general framework for state-based scheduling is presented.

  3. Observation Scheduling System

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel Q.; Rabideau, Gregg R.; Schaffer, Steven R.

    2011-01-01

    Software has been designed to schedule remote sensing with the Earth Observing One spacecraft. The software attempts to satisfy as many observation requests as possible considering each against spacecraft operation constraints such as data volume, thermal, pointing maneuvers, and others. More complex constraints such as temperature are approximated to enable efficient reasoning while keeping the spacecraft within safe limits. Other constraints are checked using an external software library. For example, an attitude control library is used to determine the feasibility of maneuvering between pairs of observations. This innovation can deal with a wide range of spacecraft constraints and solve large scale scheduling problems like hundreds of observations and thousands of combinations of observation sequences.

  4. Milestone Age Affects the Role of Health and Emotions in Life Satisfaction: A Preliminary Inquiry

    PubMed Central

    Miron-Shatz, Talya; Bhargave, Rajesh; Doniger, Glen M.

    2015-01-01

    Jill turns 40. Should this change how she evaluates her life, and would a similar change occur when she turns 41? Milestone age (e.g., 30, 40, 50)—a naturally occurring feature in personal timelines—has received much attention is popular culture, but little attention in academic inquiry. This study examines whether milestone birthdays change the way people evaluate their life. We show that life outlook is impacted by this temporal landmark, which appears to punctuate people’s mental maps of their life cycle. At these milestone junctures, people take stock of where they stand and have a more evaluative perspective towards their lives when making life satisfaction judgments. Correspondingly, they place less emphasis on daily emotional experiences. We find that milestone agers (vs. other individuals) place greater weight on health satisfaction and BMI and lesser weight on daily positive emotions in their overall life satisfaction judgments, whereas negative emotions remain influential. PMID:26244348

  5. Academic affairs and global health: how global health electives can accelerate progress towards ACGME milestones.

    PubMed

    Hayward, Alison Schroth; Jacquet, Gabrielle A; Sanson, Tracy; Mowafi, Hani; Hansoti, Bhakti

    2015-12-01

    Global health electives (GHEs) have become a standard offering in many residency programs. Residency electives should aid residents in achieving outcomes in the Accreditation Council for Graduate Medical Education (ACGME) competency domains. In this paper, the authors review existing literature and provide expert opinion to highlight how global health electives can complement traditional training programs to assist residents in achieving ACGME milestones, using emergency medicine residency as an example. Recommendations are provided for identifying exemplary global health electives and for the development of institutional global health elective curricula in order to facilitate milestone achievement. Global health electives can advance progress towards ACGME milestones; however, they may vary greatly in terms of potential for learner advancement. Electives should thus be rigorously vetted to ensure they meet standards that will facilitate this process. Given that milestones are a newly introduced tool for assessing resident educational achievement, very little research is available currently to directly determine impacts, and further study will be needed. PMID:26628320

  6. Milestone Age Affects the Role of Health and Emotions in Life Satisfaction: A Preliminary Inquiry.

    PubMed

    Miron-Shatz, Talya; Bhargave, Rajesh; Doniger, Glen M

    2015-01-01

    Jill turns 40. Should this change how she evaluates her life, and would a similar change occur when she turns 41? Milestone age (e.g., 30, 40, 50)--a naturally occurring feature in personal timelines--has received much attention is popular culture, but little attention in academic inquiry. This study examines whether milestone birthdays change the way people evaluate their life. We show that life outlook is impacted by this temporal landmark, which appears to punctuate people's mental maps of their life cycle. At these milestone junctures, people take stock of where they stand and have a more evaluative perspective towards their lives when making life satisfaction judgments. Correspondingly, they place less emphasis on daily emotional experiences. We find that milestone agers (vs. other individuals) place greater weight on health satisfaction and BMI and lesser weight on daily positive emotions in their overall life satisfaction judgments, whereas negative emotions remain influential. PMID:26244348

  7. 32 CFR 37.575 - What are my responsibilities for determining milestone payment amounts?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business... the original projections, requiring adjustments of future milestone payment amounts (see §...

  8. 32 CFR 37.575 - What are my responsibilities for determining milestone payment amounts?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business... the original projections, requiring adjustments of future milestone payment amounts (see §...

  9. 32 CFR 37.575 - What are my responsibilities for determining milestone payment amounts?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business... the original projections, requiring adjustments of future milestone payment amounts (see §...

  10. 32 CFR 37.575 - What are my responsibilities for determining milestone payment amounts?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business... the original projections, requiring adjustments of future milestone payment amounts (see §...

  11. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  12. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  13. Scheduling a C-Section

    MedlinePlus

    ... Labor & birth > Scheduling a c-section Scheduling a c-section E-mail to a friend Please fill ... develop before she’s born. Why can scheduling a c-section for non-medical reasons be a problem? ...

  14. Flexible Scheduling: Making the Transition

    ERIC Educational Resources Information Center

    Creighton, Peggy Milam

    2008-01-01

    Citing literature that supports the benefits of flexible scheduling on student achievement, the author exhorts readers to campaign for flexible scheduling in their library media centers. She suggests tips drawn from the work of Graziano (2002), McGregor (2006) and Stripling (1997) for making a smooth transition from fixed to flexible scheduling:…

  15. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  16. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  17. The Pediatrics Milestones: Conceptual Framework, Guiding Principles, and Approach to Development

    PubMed Central

    Hicks, Patricia J.; Schumacher, Daniel J.; Benson, Bradley J.; Burke, Ann E.; Englander, Robert; Guralnick, Susan; Ludwig, Stephen; Carraccio, Carol

    2010-01-01

    Background The Accreditation Council for Graduate Medical Education (ACGME) and the American Board of Pediatrics (ABP) have partnered to initiate the Pediatrics Milestone Project to further refine the 6 ACGME competencies and to set performance standards as part of the continued commitment to document outcomes of training and program effectiveness. Intervention Members of the Pediatrics Milestone Project Working Group searched the medical literature and beyond to create a synopsis of models and evidence for a developmental ontogeny of the elements for 52 subcompetencies. For each subcompetency, we created a series of Milestones, grounded in the literature. The milestones were vetted with the entire working group, engaging in an iterative process of revisions until reaching consensus that their narrative descriptions (1) included all critical elements, (2) were behaviorally based, (3) were properly sequenced, and (4) represented the educational continuum of training and practice. Outcomes We have completed the first iteration of milestones for all subcompetencies. For each milestone, a synopsis of relevant literature provides background, references, and a conceptual framework. These milestones provide narrative descriptions of behaviors that represent the ontogeny of knowledge, skill, and attitude development across the educational continuum of training and practice. Discussion The pediatrics milestones take us a step closer to meaningful outcome assessment. Next steps include undertaking rigorous study, making appropriate modifications, and setting performance standards. Our aim is to assist program directors in making more reliable and valid judgments as to whether a resident is a “good doctor” and to provide outcome evidence regarding the program's success in developing doctors. PMID:21976091

  18. MILESTONES AND FUTURE DIRECTIONS IN THE SOLVENT EXTRACTION OF CAESIUM

    SciTech Connect

    Moyer, Bruce A

    2011-01-01

    The remarkable development of solvent-extraction (SX) chemistry for caesium separation over the past half a century as driven by the needs of the nuclear industry now constitutes an instructive case study in exploring the limits of selectivity and cycle efficiency in SX. In this review, key milestones in the pursuit of both fundamentals and applications of caesium extraction will be highlighted along with a look at future prospects. The high-yield fission-product 137Cs constitutes a major fraction of the radioactivity in nuclear wastes, and in view of its heat production, environmental mobility, radiation hazard, and even uses as a radiation source, methods have long been sought for its separation. Toward this end, the evolving science has been challenged by daunting requirements for decontamination in the presence of high concentrations of competing cations, and demands for small footprint, modular design, and high throughput place a premium on selectivity and efficiency. Fortunately, the science has also benefited from the peculiar economics of nuclear separations, which have afforded the development of wonderfully sophisticated reagents. With its location in the lower left side of the periodic table, the Cs+ cation has the distinction of having the lowest charge density of any metal cation except short-lived francium. For practical purposes, Cs+ is thus the least hydrated and, in principle, the most directly extractable metal cation. Technologies employing liquid-liquid cation exchange with very large, durable anions like those from the dicarbollide family have therefore been quite effective based solely on solvation principles. Alternatively, researchers have turned to macrocyclic coordinating extractants, such as calix-crown ethers, following principles of molecular recognition, with dramatic results. Overall, strides continue along these lines, though it is apparent that caesium SX has reached a state of excellent fundamental understanding and technical

  19. ALMA Achieves Major Milestone With Antenna-Link Success

    NASA Astrophysics Data System (ADS)

    2007-03-01

    The Atacama Large Millimeter/submillimeter Array (ALMA), an international telescope project, reached a major milestone on March 2, when two ALMA prototype antennas were first linked together as an integrated system to observe an astronomical object. The milestone achievement, technically termed "First Fringes," came at the ALMA Test Facility (ATF) on the grounds of the National Radio Astronomy Observatory's (NRAO) Very Large Array (VLA) radio telescope in New Mexico. NRAO is a facility of the National Science Foundation (NSF), managed by Associated Universities, Incorporated (AUI). AUI also is designated by NSF as the North American Executive for ALMA. ALMA Test Facility ALMA Test Facility, New Mexico: VertexRSI antenna, left; AEC antenna, right. CREDIT: Drew Medlin, NRAO/AUI/NSF Click on image for page of graphics and full information Faint radio waves emitted by the planet Saturn were collected by the two ALMA antennas, then processed by new, state-of-the-art electronics to turn the two antennas into a single, high-resolution telescope system, called an interferometer. Such pairs of antennas are the basic building blocks of multi-antenna imaging systems such as ALMA and the VLA. In such a system, each antenna is combined electronically with every other antenna to form a multitude of pairs. Each pair contributes unique information that is used to build a highly-detailed image of the astronomical object under observation. When completed in 2012, ALMA will have 66 antennas. The successful Saturn observation began at 7:13 p.m., U.S. Mountain Time Friday (0213 UTC Saturday). The planet's radio emissions at a frequency of 104 GigaHertz (GHz) were tracked by the ALMA system for more than an hour. "Our congratulations go to the dedicated team of scientists, engineers and technicians who produced this groundbreaking achievement for ALMA. Much hard work and many long hours went into this effort, and we appreciate it all. This team should be very proud today," said NRAO

  20. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books.... (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per Books With...

  1. APGEN Scheduling: 15 Years of Experience in Planning Automation

    NASA Technical Reports Server (NTRS)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  2. Educational Milestone Development in the First 7 Specialties to Enter the Next Accreditation System

    PubMed Central

    Swing, Susan R.; Beeson, Michael S.; Carraccio, Carol; Coburn, Michael; Iobst, William; Selden, Nathan R.; Stern, Peter J.; Vydareny, Kay

    2013-01-01

    Background The Accreditation Council for Graduate Medical Education (ACGME) Outcome Project introduced 6 general competencies relevant to medical practice but fell short of its goal to create a robust assessment system that would allow program accreditation based on outcomes. In response, the ACGME, the specialty boards, and other stakeholders collaborated to develop educational milestones, observable steps in residents' professional development that describe progress from entry to graduation and beyond. Objectives We summarize the development of the milestones, focusing on 7 specialties, moving to the next accreditation system in July 2013, and offer evidence of their validity. Methods Specialty workgroups with broad representation used a 5-level developmental framework and incorporated information from literature reviews, specialty curricula, dialogue with constituents, and pilot testing. Results The workgroups produced richly diverse sets of milestones that reflect the community's consideration of attributes of competence relevant to practice in the given specialty. Both their development process and the milestones themselves establish a validity argument, when contemporary views of validity for complex performance assessment are used. Conclusions Initial evidence for validity emerges from the development processes and the resulting milestones. Further advancing a validity argument will require research on the use of milestone data in resident assessment and program accreditation. PMID:24404235

  3. Kinetics of O2 Entry and Exit in Monomeric Sarcosine Oxidase via Markovian Milestoning Molecular Dynamics.

    PubMed

    Bucci, Anthony; Yu, Tang-Qing; Vanden-Eijnden, Eric; Abrams, Cameron F

    2016-06-14

    The flavoenzyme monomeric sarcosine oxidase (MSOX) catalyzes a complex set of reactions currently lacking a consensus mechanism. A key question that arises in weighing competing mechanistic models of MSOX function is to what extent ingress of O2 from the solvent (and its egress after an unsuccessful oxidation attempt) limits the overall catalytic rate. To address this question, we have applied to the MSOX/O2 system the relatively new simulation method of Markovian milestoning molecular dynamics simulations, which, as we recently showed [ Yu et al. J. Am. Chem. Soc. 2015 , 137 , 3041 ], accurately predicted the entry and exit kinetics of CO in myoglobin. We show that the mechanism of O2 entry and exit, in terms of which possible solvent-to-active-site channels contribute to the flow of O2, is sensitive to the presence of the substrate-mimicking competitive inhibitor 2-furoate in the substrate site. The second-order O2 entry rate constants were computed to be 8.1 × 10(6) and 3.1 × 10(6) M(-1) s(-1) for bound and apo MSOX, respectively, both of which moderately exceed the experimentally determined second-order rate constant of (2.83 ± 0.07) × 10(5) M(-1) s(-1) for flavin oxidation by O2 in MSOX. This suggests that the rate of flavin oxidation by O2 is likely not strongly limited by diffusion from the solvent to the active site. The first-order exit rate constants were computed to be 10(7) s(-1) and 7.2 × 10(6) s(-1) for the apo and bound states, respectively. The predicted faster entry and slower exit of O2 for the bound state indicate a longer residence time within MSOX, increasing the likelihood of collisions with the flavin isoalloxazine ring, a step required for reduction of molecular O2 and subsequent reoxidation of the flavin. This is also indirectly supported by previous experimental evidence favoring the so-called modified ping-pong mechanism, the distinguishing feature of which is an intermediate complex involving O2, the flavin, and the oxidized

  4. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  5. Flexible Block Scheduling: It Works for Us!

    ERIC Educational Resources Information Center

    Huff, A. Leroy

    1995-01-01

    After investigating alternatives, a Missouri high school adopted the eight-block flexible scheduling model. Instead of meeting 45-60 minutes every day, classes now meet 94 minutes every other day. Staff and students are enthusiastic. Longer instructional periods allow teachers to develop key concepts and use diverse learning activities and permit…

  6. Scheduling Jobs with Genetic Algorithms

    NASA Astrophysics Data System (ADS)

    Ferrolho, António; Crisóstomo, Manuel

    Most scheduling problems are NP-hard, the time required to solve the problem optimally increases exponentially with the size of the problem. Scheduling problems have important applications, and a number of heuristic algorithms have been proposed to determine relatively good solutions in polynomial time. Recently, genetic algorithms (GA) are successfully used to solve scheduling problems, as shown by the growing numbers of papers. GA are known as one of the most efficient algorithms for solving scheduling problems. But, when a GA is applied to scheduling problems various crossovers and mutations operators can be applicable. This paper presents and examines a new concept of genetic operators for scheduling problems. A software tool called hybrid and flexible genetic algorithm (HybFlexGA) was developed to examine the performance of various crossover and mutation operators by computing simulations of job scheduling problems.

  7. Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course

    ERIC Educational Resources Information Center

    Huelskamp, Diana

    2014-01-01

    Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…

  8. 30 CFR 816.64 - Use of explosives: Blasting schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Use of explosives: Blasting schedule. 816.64... ACTIVITIES § 816.64 Use of explosives: Blasting schedule. (a) General requirements. (1) The operator shall... specific areas in which blasting will take place; (3) Dates and time periods when explosives are to...

  9. 30 CFR 816.64 - Use of explosives: Blasting schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Use of explosives: Blasting schedule. 816.64... ACTIVITIES § 816.64 Use of explosives: Blasting schedule. (a) General requirements. (1) The operator shall... specific areas in which blasting will take place; (3) Dates and time periods when explosives are to...

  10. 30 CFR 816.64 - Use of explosives: Blasting schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Use of explosives: Blasting schedule. 816.64... ACTIVITIES § 816.64 Use of explosives: Blasting schedule. (a) General requirements. (1) The operator shall... specific areas in which blasting will take place; (3) Dates and time periods when explosives are to...

  11. 30 CFR 816.64 - Use of explosives: Blasting schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Use of explosives: Blasting schedule. 816.64... ACTIVITIES § 816.64 Use of explosives: Blasting schedule. (a) General requirements. (1) The operator shall... specific areas in which blasting will take place; (3) Dates and time periods when explosives are to...

  12. 30 CFR 816.64 - Use of explosives: Blasting schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Use of explosives: Blasting schedule. 816.64... ACTIVITIES § 816.64 Use of explosives: Blasting schedule. (a) General requirements. (1) The operator shall... specific areas in which blasting will take place; (3) Dates and time periods when explosives are to...

  13. Integrated network design and scheduling problems :

    SciTech Connect

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  14. CRI planning and scheduling for space

    NASA Technical Reports Server (NTRS)

    Aarup, Mads

    1994-01-01

    Computer Resources International (CRI) has many years of experience in developing space planning and scheduling systems for the European Space Agency. Activities range from AIT/AIV planning over mission planning to research in on-board autonomy using advanced planning and scheduling technologies in conjunction with model based diagnostics. This article presents four projects carried out for ESA by CRI with various subcontractors: (1) DI, Distributed Intelligence for Ground/Space Systems is an on-going research project; (2) GMPT, Generic Mission Planning Toolset, a feasibility study concluded in 1993; (3) OPTIMUM-AIV, Open Planning Tool for AIV, development of a knowledge based AIV planning and scheduling tool ended in 1992; and (4) PlanERS-1, development of an AI and knowledge-based mission planning prototype for the ERS-1 earth observation spacecraft ended in 1991.

  15. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  16. Southeastern Environmental Resources Alliance [Status report on completion milestones incorporated in the Cooperative Agreement, and draft start-up plan March 24, 1995

    SciTech Connect

    1995-12-31

    The Southeastern Environmental Resources Alliance (SERA) is a joint effort between the US Department of Energy, the states of Georgia and South Carolina, and Westinghouse Savannah River Company (WSRC). The original proposal for SERA, submitted under the Technology Reinvestment Project (TRP), is based on improving the competitiveness of manufacturers within Georgia and South Carolina by addressing the costs associated with environmental and waste management issues. By using the many technologies available through the national laboratories, universities, the Savannah River Site, and the commercial sector, SERA will improve the competitive position of companies that would otherwise have no access to those technologies. This Start-Up Plan details the steps SERA will take to begin effective operations by June 1, 1995, and will focus on the short-term needs of the program. This plan will serve as a supplement to the original SERA proposal, and will address the major milestones included in the Department of Energy`s Cooperative Agreement. Also documented are the planning processes that SERA will use to ensure the long-term viability of the program. The planning process will include additional work elements that are referenced by the original proposal, but, for the purposes of program start-up, are not immediately addressed. The major milestones and schedules are provided for each goal.

  17. HUBBLE PHOTOGRAPHS WARPED GALAXY AS CAMERA PASSES MILESTONE

    NASA Technical Reports Server (NTRS)

    2002-01-01

    observations of ESO 510-G13, WFPC2 passed the milestone of taking its 100,000th image since its installation in the telescope by shuttle astronauts in 1993. Image Credit: NASA and the Hubble Heritage Team (STScI/AURA) Acknowledgment: C. Conselice (U. Wisconsin/STScI)

  18. Plan and schedule for disposition and regulatory compliance for all remaining Miscellaneous Streams

    SciTech Connect

    Skurla, S.J.

    1994-01-01

    On December 23, 1991, the US Department of Energy, Richland Operations Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM-177 (Consent Order) (Ecology and USDOE, 1991). The Consent Order lists regulatory milestones for liquid effluent streams at the Hanford Site to comply with the permitting requirements of Washington Administrative Code 173-216 or 173-218 where applicable (WAC 173-216/218). Hanford Site liquid effluent stream discharging to the soil column have been categorized in the Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams are identified in two RL reports: ``Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site`` (DOE-RL 1987), and ``Annual Status of the Report of the Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site`` (Stordeur 1988). Miscellaneous Streams are those liquid effluent streams discharged to the ground that are not categorized as Phase I or Phase II Streams. Miscellaneous Streams discharging to the soil column at the Hanford Site are subject to the requirements of several milestones identified in the Consent Order. This document provides a plan and schedule for the disposition of Miscellaneous Streams to satisfy one of the Miscellaneous Stream Consent Order requirements. The disposition process for the Miscellaneous Streams as developed for this milestone is facilitated using a decision tree format. The logic diagram and corresponding analysis for determining appropriate disposition of these streams is presented in this document.

  19. Expert system for on-board satellite scheduling and control

    NASA Technical Reports Server (NTRS)

    Barry, John M.; Sary, Charisse

    1988-01-01

    An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

  20. ALMA Telescope Passes Major Milestone with Successful Antenna Link

    NASA Astrophysics Data System (ADS)

    2009-05-01

    The Atacama Large Millimeter/submillimeter Array (ALMA), an immense international telescope project under construction in northern Chile, reached a major milestone on April 30, when two ALMA antennas were linked together as an integrated system to observe an astronomical object for the first time. The milestone achievement, technically termed "First Fringes," came at ALMA’s Operations Support Facility, 9,500 feet above sea level. Faint radio waves emitted by the planet Mars were collected by the two 12-meter diameter ALMA antennas, then processed by state-of-the-art electronics to turn the two antennas into a single, high-resolution telescope system, called an interferometer. Such pairs of antennas are the basic building blocks of imaging systems that enable radio telescopes to deliver pictures that approach or even exceed the resolving power of visible light telescopes. In such a system, each antenna is combined electronically with every other antenna to form a multitude of antenna pairs. Each pair contributes unique information that is used to build a highly-detailed image of the astronomical object under observation. When completed early in the next decade, ALMA’s 66 antennas will provide over a thousand such antenna pairings, with distances between antennas exceeding ten miles. This will enable ALMA to see with a sharpness surpassing that of the best space telescopes. The antennas will operate at an altitude of 16,500 feet, high above the OSF, in one of the best locations on Earth for millimeter-wavelength astronomy, the Chajnantor Plateau in Chile’s Atacama Desert. Last week’s successful Mars observation was conducted at an observing frequency of 104.2 GHz. Astronomers measured the distinctive varying “fringes” detected by the interferometer as the planet moved across the sky. “This is a great success,” said Adrian Russell, North American ALMA Project Director at the National Radio Astronomy Observatory (NRAO), “not because we observed a

  1. FINAL REPORT: SUNSHINE STATE SOLAR GRID INITIATIVE (SUNGRIN) PHASE 1 (Critical Milestone Review Version)

    SciTech Connect

    Meeker, Rick; Steurer, Mischa; Li, Hui; Edrington, Chris; Dale, Steinar; Faruque, MD Omar; Schoder, Karl; McLaren, Peter G.; Liu, Liming; Ravindra, Harsha; Henry, Shawn; Zhou, Yan; Liu, Xiaohu; Springstroh, Aaron; Click, David; Reedy, Robert; Moaveni, Houtan; Davis, Kristopher; Cromer, Charlie; Pappalardo, Anthoney; Krueger, Rodica; Domijan, Alexander; Islam, Arif; Islam, Mujahidil; Damole, Ademole

    2012-03-30

    This report provides details on the activities and accomplishments of Phase 1 of the Sunshine State Solar Grid Initiative (SUNGRIN) Project for the period beginning 4/28/2010 and ending 12/31/2011. SUNGRIN is a five-phase high-penetration solar PV project within the Systems Integration (SI) area of the Solar Energy Technologies (SETP) Program, under the SunShot Initiative. SUNGRIN is focused on understanding and enabling high-penetration grid-connected solar PV through simulation assisted studies of actual Florida utility high-penetration distribution circuits as well as substations and, to a limited extent, the bulk power system. Each phase builds and expands upon the efforts of the previous phase, leading to a comprehensive examination and understanding of high-penetration solar PV issues, from the solar resource to the conversion and integration technologies to the electric power system, with Florida and it’s utility partners providing the broad range of conditions and system integration scenarios necessary to develop useful insight and solutions. This phase, Phase 1, was funded with American Recovery and Reinvestment Act (ARRA) funds. This version of the final report is organized to align with statement of project objectives (SOPO) critical milestones.

  2. Introducing the Guard-Stage-Milestone Approach for Specifying Business Entity Lifecycles

    NASA Astrophysics Data System (ADS)

    Hull, Richard; Damaggio, Elio; Fournier, Fabiana; Gupta, Manmohan; Heath, Fenno (Terry); Hobson, Stacy; Linehan, Mark; Maradugu, Sridhar; Nigam, Anil; Sukaviriya, Piyawadee; Vaculin, Roman

    A promising approach to managing business operations is based on business entities with lifecycles (BEL's) (a.k.a. business artifacts), i.e., key conceptual entities that are central to guiding the operations of a business, and whose content changes as they move through those operations. A BEL type includes both an information model that captures, in either materialized or virtual form, all of the business-relevant data about entities of that type, and a lifecycle model, that specifies the possible ways an entity of that type might progress through the business by responding to events and invoking services, including human activities. Most previous work on BEL's has focused on the use of lifecycle models based on variants of finite state machines. This paper introduces the Guard-Stage-Milestone (GSM) meta-model for lifecycles, which is an evolution of the previous work on BEL's. GSM lifecycles are substantially more declarative than the finite state machine variants, and support hierarchy and parallelism within a single entity instance. The GSM operational semantics are based on a form of Event-Condition-Action (ECA) rules, and provide a basis for formal verification and reasoning. This paper provides an informal, preliminary introduction to the GSM approach, and briefly overviews selected research directions.

  3. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  4. Schedule-induced licking during multiple schedules1

    PubMed Central

    Jacquet, Yasuko Filby

    1972-01-01

    Schedule-induced polydipsia was studied in rats bar pressing under two-component multiple schedules of food reinforcement. The first component of the multiple schedule was a variable-interval 1-min schedule throughout the experiment. The schedule comprising the second component was varied over blocks of sessions in terms of rate and magnitude of reinforcement, and was either variable-interval 3-min (one pellet), variable-interval 3-min (three pellets), variable-interval 1-min (one pellet), or extinction. Water intake per session varied with the rate of reinforcement in the schedule comprising the second component and was highest when the schedule was variable-interval 1-min. Both bar-pressing behavior and licking behavior showed behavioral interactions between the two components of the multiple schedules. With magnitude of reinforcement held constant, a matching relationship was observed between lick rate and reinforcement rate; the relative frequency of licks in the constant component matched the relative frequency of reinforcement in that component. Bar pressing, however, showed only a moderate degree of relativity matching. During the schedule-induced licking, a burst of licking followed each delivery of a pellet (post-prandial drinking). The duration of these bursts of licking was observed to be a function of the inter-reinforcement interval. PMID:16811598

  5. Utilizing AI in Temporal, Spatial, and Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Stottler, Richard; Kalton, Annaka; Bell, Aaron

    2006-01-01

    Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

  6. Optimal Schedules of Light Exposure for Rapidly Correcting Circadian Misalignment

    PubMed Central

    Serkh, Kirill; Forger, Daniel B.

    2014-01-01

    Jet lag arises from a misalignment of circadian biological timing with the timing of human activity, and is caused by rapid transmeridian travel. Jet lag's symptoms, such as depressed cognitive alertness, also arise from work and social schedules misaligned with the timing of the circadian clock. Using experimentally validated mathematical models, we develop a new methodology to find mathematically optimal schedules of light exposure and avoidance for rapidly re-entraining the human circadian system. In simulations, our schedules are found to significantly outperform other recently proposed schedules. Moreover, our schedules appear to be significantly more robust to both noise in light and to inter-individual variations in endogenous circadian period than other proposed schedules. By comparing the optimal schedules for thousands of different situations, and by using general mathematical arguments, we are also able to translate our findings into general principles of optimal circadian re-entrainment. These principles include: 1) a class of schedules where circadian amplitude is only slightly perturbed, optimal for dim light and for small shifts 2) another class of schedules where shifting occurs along the shortest path in phase-space, optimal for bright light and for large shifts 3) the determination that short light pulses are less effective than sustained light if the goal is to re-entrain quickly, and 4) the determination that length of daytime should be significantly shorter when delaying the clock than when advancing it. PMID:24722195

  7. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  8. Remote Collaboration on Task Scheduling for Humans at Mars

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  9. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, there are many reasons why the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  10. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  11. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  12. Group scheduling problems in directional sensor networks

    NASA Astrophysics Data System (ADS)

    Singh, Alok; Rossi, André

    2015-12-01

    This article addresses the problem of scheduling a set of groups of directional sensors arising as a result of applying an exact or a heuristic approach for solving a problem involving directional sensors. The problem seeks a schedule for these groups that minimizes the total energy consumed in switching from one group to the next group in the schedule. In practice, when switching from a group to the next one, active sensors in the new group have to rotate in order to face their working direction. These rotations consume energy, and the problem is to schedule the groups so as to minimize the total amount of energy consumed by all the sensor rotations, knowing the initial angular positions of all the sensors. In this article, it is assumed that energy consumption is proportional to the angular movement for all the sensors. Another problem version is also investigated that seeks to minimize the total time during which the sensor network cannot cover all the targets because active sensors are rotating. Both problems are proved to be ?-hard, and a lower bound for the first problem is presented. A greedy heuristic and a genetic algorithm are also proposed for addressing the problem of minimizing total rotation in the general case. Finally, a local search is also proposed to improve the solutions obtained through a genetic algorithm.

  13. 1993 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  14. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  15. Level II Milestone Review of LLNL Program on Grain-Scale Dynamics in Explosives

    SciTech Connect

    Nicol, M F; Benson, D J; Yip, S

    2003-01-14

    This document describes an evaluation of the Level II Milestone achievements of the LLNL program on Grain-Scale Dynamics in Explosives on January 14, 2003. ''The Grain-Scale Dynamics in Explosives Program'' is a mixture of advanced computational methodology and physico-chemical theory applied to understanding deflagration and detonation of plastic-bonded explosives from the nano to the macro scales. At many points, the modeling is tied directly to experiments within the precisions of both. Advances are needed in the experimental, theoretical, and computational aspects of detonations. Work reported in this review represents significant, cross-pollinating advances in each area. The team successfully carried out ALE-3D simulations of deflagration in PBX with grain scale effects. (Milestone requirements 1 and 2), interpreted experimental data on flame speed vs. pressure and sensitivity to global kinetics in terms of ALE-3D simulations (Milestone requirement 3), and used the results of these simulations to develop a continuum reactive flow model that captures some of these effects (Milestone requirement 4). By comparing experiments and detonation velocities in small diameter, unconfined explosives, they found non-idealities that remain at intermediate diameters (ca. 1.5 mm) that require further analysis. In all of these areas, the project team has met, indeed exceeded, their Level II Milestone goals.

  16. An Analysis of Shuttle Crew Scheduling Violations

    NASA Technical Reports Server (NTRS)

    Bristol, Douglas

    2012-01-01

    From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.

  17. 20 CFR 411.545 - How are the outcome payments calculated under the outcome-milestone payment system?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Title XVI amount of payment Phase 1 (120% of Title II PCB) Milestone 1 $335/mo. $670/mo. × 3 mo. work in... Phase 1 milestones $4,708 $4,708 Phase 2 (36% of PCB) Gross Earnings>SGA Title II milestones 1-11 $353... payments (36% of PCB) Title II = 1-36 Monthly cash benefit not payable due to SGA $353 × 36 = $12,708...

  18. 20 CFR 411.545 - How are the outcome payments calculated under the outcome-milestone payment system?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Title XVI amount of payment Phase 1 (120% of Title II PCB) Milestone 1 $335/mo. $670/mo. × 3 mo. work in... Phase 1 milestones $4,708 $4,708 Phase 2 (36% of PCB) Gross Earnings>SGA Title II milestones 1-11 $353... payments (36% of PCB) Title II = 1-36 Monthly cash benefit not payable due to SGA $353 × 36 = $12,708...

  19. 20 CFR 411.545 - How are the outcome payments calculated under the outcome-milestone payment system?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Title XVI amount of payment Phase 1 (120% of Title II PCB) Milestone 1 $335/mo. $670/mo. × 3 mo. work in... Phase 1 milestones $4,708 $4,708 Phase 2 (36% of PCB) Gross Earnings>SGA Title II milestones 1-11 $353... payments (36% of PCB) Title II = 1-36 Monthly cash benefit not payable due to SGA $353 × 36 = $12,708...

  20. 20 CFR 411.545 - How are the outcome payments calculated under the outcome-milestone payment system?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Title XVI amount of payment Phase 1 (120% of Title II PCB) Milestone 1 $335/mo. $670/mo. × 3 mo. work in... Phase 1 milestones $4,708 $4,708 Phase 2 (36% of PCB) Gross Earnings>SGA Title II milestones 1-11 $353... payments (36% of PCB) Title II = 1-36 Monthly cash benefit not payable due to SGA $353 × 36 = $12,708...

  1. Milestones Towards Hot CMC Structures for Operational Space Rentry Vehicles

    NASA Astrophysics Data System (ADS)

    Hald, H.; Weihs, H.; Reimer, T.

    2002-01-01

    Hot structures made of ceramic matrix composites (CMC) for space reentry vehicles play a key role regarding feasibility of advanced and reusable future space transportation systems. Thus realization of applicable flight hardware concerning hot primary structures like a nose cap or body flaps and thermal protection systems (TPS) requires system competence w.r.t. sophisticated know how in material processing, manufacturing and qualification of structural components and in all aspects from process control, use of NDI techniques, arc jet testing, hot structure testing to flight concept validation. This goal has been achieved so far by DLR while following a dedicated development road map since more than a decade culminating at present in the supply of the nose cap system for NASA's X-38; the flight hardware has been installed successfully in October 2001. A number of unique hardware development milestones had to be achieved in the past to finally reach this level of system competence. It is the intention of this paper to highlight the most important technical issues and achievements from the essential projects and developments to finally provide a comprehensive insight into DLR's past and future development road map w.r.t. CMC hot structures for space reentry vehicles. Based on DLR's C/C-SiC material which is produced with the inhouse developed liquid silicon infiltration process (LSI) the development strategy first concentrated on basic material properties evaluation in various arc jet testing facilities. As soon as a basic understanding of oxidation and erosion mechanisms had been achieved further efforts concentrated on inflight verification of both materials and design concepts for hot structures. Consequently coated and uncoated C/C-SiC specimens were integrated into the ablative heat shield of Russian FOTON capsules and they were tested during two missions in 1992 and 1994. Following on, a hot structure experiment called CETEX which principally was a kind of a

  2. Optimum connection management scheduling

    NASA Astrophysics Data System (ADS)

    Kadar, Ivan

    2000-08-01

    Connection Management plays a key role in both distributed 'local' network-centric and 'globally' connected info- centric systems. The role of Connection Management is to provide seamless demand-based sharing of the information products. For optimum distributed information fusion performance, these systems must minimize communications delays and maximize message throughput, and at the same time take into account relative-sensors-targets geometrical constraints and data pedigree. In order to achieve overall distributed 'network' effectiveness, these systems must be adaptive, and be able to distribute data s needed in real- time. A system concept will be described which provides optimum capacity-based information scheduling. A specific example, based on a satellite channel, is used to illustrate simulated performance results and their effects on fusion systems performance.

  3. Scheduling Results for the THEMIS Observation Scheduling Tool

    NASA Technical Reports Server (NTRS)

    Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip

    2011-01-01

    We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

  4. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... public commitment satisfactory to the Director, such as a resolution of the board of directors of a... regulated activities, the Director may issue or modify a permit to contain two schedules as follows:...

  5. Purple Level - 1 Milestone Review Committee I/O and Archive Follow-up Demonstration

    SciTech Connect

    Gary, M R

    2006-12-05

    On July 7th 2006, the Purple Level-1 Review Committee convened and was presented with evidence of the completion of Level-2 Milestone 461 (Deploy First Phase of I/O Infrastructure for Purple) which was performed in direct support of the Purple Level-1 milestone. This evidence included a short presentation and the formal documentation of milestone No.461 (see UCRL-TR-217288). Following the meeting, the Committee asked for the following additional evidence: (1) Set a speed measurement/goal/target assuming a number of files that the user needs to get into the archives. Then redo the benchmark using whatever tool(s) the labs prefer (HTAR, for example). Document how long the process takes. (2) Develop a test to read files back to confirm that what the user gets out of the archive is what the user put into the archive. This evidence has been collected and is presented here.

  6. Modeling kinetics and equilibrium of membranes with fields: Milestoning analysis and implication to permeation

    SciTech Connect

    Cardenas, Alfredo E.; Elber, Ron

    2014-08-07

    Coarse graining of membrane simulations by translating atomistic dynamics to densities and fields with Milestoning is discussed. The space of the membrane system is divided into cells and the different cells are characterized by order parameters presenting the number densities. The dynamics of the order parameters are probed with Milestoning. The methodology is illustrated here for a phospholipid membrane system (a hydrated bilayer of DOPC (1,2-dioleoyl-sn-glycero-3-phosphocholine) lipid molecules). Significant inhomogeneity in membrane internal number density leads to complex free energy landscape and local maps of transition times. Dynamics and distributions of cavities within the membrane assist the permeation of nonpolar solutes such as xenon atoms. It is illustrated that quantitative and detailed dynamics of water transport through DOPC membrane can be analyzed using Milestoning with fields. The reaction space for water transport includes at least two slow variables: the normal to the membrane plane, and the water density.

  7. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared under § 714.1(a)(1)(ii) of the CWCR an additional Schedule 3 chemical above the declaration...

  8. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared under § 714.1(a)(1)(ii) of the CWCR an additional Schedule 3 chemical above the declaration...

  9. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared under § 714.1(a)(1)(ii) of the CWCR an additional Schedule 3 chemical above the declaration...

  10. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared under § 714.1(a)(1)(ii) of the CWCR an additional Schedule 3 chemical above the declaration...

  11. Request-Driven Schedule Automation for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  12. The application of artificial intelligence to astronomical scheduling problems

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  13. Modeling the Cray memory scheduler

    SciTech Connect

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  14. Flexible Work Schedules. ERIC Digest.

    ERIC Educational Resources Information Center

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  15. Web-based irrigation scheduler

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Currently, few web-based irrigation scheduling tools are available for the humid growing environments of the Mid-South. Common irrigation scheduling systems rely on soil or weather data to estimate crop water use, and are more commonly calibrated for dry growing environments. Increasing use of water...

  16. Scheduling constrained tools using heuristic techniques

    NASA Astrophysics Data System (ADS)

    Maram, Venkataramana; Rahman, Syariza Abdul; Maram, Sandhya Rani

    2015-12-01

    One of the main challenge to the current manufacturing production planning is to provide schedules of operations to maximize resource utilization to yield highest overall productivity. This is achieved by scheduling available resources to activities. There can be many different real time scenarios with different combination of input resources to produce parts. In this paper, the problem is simplified to single machine with individual process times and due dates to represent the real world scheduling problem. The main objective function is to minimize the total tardiness or late jobs. Nearest greedy method of assignment problem algorithm is used to find the initial solution followed by Simulated Annealing (SA) algorithm for the improvement part. Simulated Annealing is one of the meta-heuristic techniques in solving combinatorial optimization problem. The general purpose Microsoft Visual C++ is used to developed algorithm for finding the best solution. The proposed hybrid approach able to generate best schedule in 7th and optimal in 170th iteration with tardiness 8 and 7 hours respectively.

  17. Planning as a Precursor to Scheduling for Space Station Payload Operations

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Maxwell, Theresa

    1995-01-01

    Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

  18. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  19. Scheduling with partial orders and a causal model

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; Carciofini, Jim; Hadden, George D.

    1993-01-01

    In an ongoing project at Honeywell SRC, we are constructing a prototype scheduling system for a NASA domain using the 'Time Map Manager' (TMM). The TMM representations are flexible enough to permit the representation of precedence constraints, metric constraints between activities, and constraints relative to a variety of references (e.g., Mission Elapsed Time vs. Mission Day). The TMM also supports a simple form of causal reasoning (projection), dynamic database updates, and monitoring specified database properties as changes occur over time. The greatest apparent advantage to using the TMM is the flexibility added to the scheduling process: schedules are constructed by a process of 'iterative refinement,' in which scheduling decisions correspond to constraining an activity either with respect to another activity or with respect to one time line. The schedule becomes more detailed as activities and constraints are added. Undoing a scheduling decision means removing a constraint, not removing an activity from a specified place on the time line. For example, we can move an activity around on the time line by deleting constraints and adding new ones.

  20. A pilot study of orthopaedic resident self-assessment using a milestones’ survey just prior to milestones implementation

    PubMed Central

    Bradley, Kendall E.

    2016-01-01

    Objectives To pilot test if Orthopaedic Surgery residents could self-assess their performance using newly created milestones, as defined by the Accreditation Council on Graduate Medical Education.  Methods In June 2012, an email was sent to Program Directors and administrative coordinators of the154 accredited Orthopaedic Surgery Programs, asking them to send their residents a link to an online survey. The survey was adapted from the Orthopaedic Surgery Milestone Project. Completed surveys were aggregated in an anonymous, confidential database. SAS 9.3 was used to perform the analyses. Results Responses from 71 residents were analyzed. First and second year residents indicated through self-assessment that they had substantially achieved Level 1 and Level 2 milestones. Third year residents reported they had substantially achieved 30/41, and fourth year residents, all Level 3 milestones. Fifth year, graduating residents, reported they had substantially achieved 17 Level 4 milestones, and were extremely close on another 15. No milestone was rated at Level 5, the maximum possible.  Earlier in training, Patient Care and Medical Knowledge milestones were rated lower than the milestones reflecting the other four competencies of Practice Based Learning and Improvement, Systems Based Practice, Professionalism, and Interpersonal Communication. The gap was closed by the fourth year. Conclusions Residents were able to successfully self-assess using the 41 Orthopaedic Surgery milestones. Respondents’ rate improved proficiency over time. Graduating residents report they have substantially, or close to substantially, achieved all Level 4 milestonesMilestone self-assessment may be a useful tool as one component of a program’s overall performance assessment strategy. PMID:26752012

  1. Incremental Scheduling Engines for Human Exploration of the Cosmos

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  2. Schedules of Controlled Substances: Temporary Placement of the Synthetic Cannabinoid MAB-CHMINACA Into Schedule I. Final order.

    PubMed

    2016-02-01

    The Administrator of the Drug Enforcement Administration is issuing this final order to temporarily schedule the synthetic cannabinoid N-(1-amino-3,3-dimethyl-1-oxobutan-2-yl)-1-(cyclohexylmethyl)-1H-indazole-3-carboxamide (common names, MAB-CHMINACA and ADB-CHMINACA), and its optical, positional, and geometric isomers, salts, and salts of isomers into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of this synthetic cannabinoid into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, MAB-CHMINACA. PMID:26859902

  3. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  4. Knowledge based tools for Hubble Space Telescope planning and scheduling: Constraints and strategies

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Johnston, Mark; Vick, Shon; Sponsler, Jeff; Lindenmayer, Kelly

    1988-01-01

    The Hubble Space Telescope (HST) presents an especially challenging scheduling problem since a year's observing program encompasses tens of thousands of exposures facing numerous coupled constraints. Recent progress in the development of planning and scheduling tools is discussed which augment the existing HST ground system. General methods for representing activities, constraints, and constraint satisfaction, and time segmentation were implemented in a scheduling testbed. The testbed permits planners to evaluate optimal scheduling time intervals, calculate resource usage, and to generate long and medium range plans. Graphical displays of activities, constraints, and plans are an important feature of the system. High-level scheduling strategies using rule based and neural net approaches were implemented.

  5. Schedules of controlled substances: temporary placement of four synthetic cannabinoids into Schedule I. Final order.

    PubMed

    2014-02-10

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule four synthetic cannabinoids into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act (CSA). The substances are: Quinolin-8-yl 1-pentyl-1H-indole-3-carboxylate (PB-22; QUPIC); quinolin-8-yl 1-(5-fluoropentyl)-1H-indole-3-carboxylate (5-fluoro-PB-22; 5F-PB-22); N-(1-amino-3-methyl-1-oxobutan-2-yl)-1-(4-fluorobenzyl)-1H-indazole-3-carboxamide (AB-FUBINACA); and N-(1-amino-3,3-dimethyl-1-oxobutan-2-yl)-1-pentyl-1H-indazole-3-carboxamide (ADB-PINACA). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their optical, positional, and geometric isomers, salts and salts of isomers into schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, import, export, engage in research, conduct instructional activities, and possess), or propose to handle these synthetic cannabinoids. PMID:24605391

  6. Schedules of controlled substances: placement of perampanel into Schedule III. Final rule.

    PubMed

    2013-12-01

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance perampanel [2-(2-oxo-1-phenyl-5-pyridin-2-yl-1,2-dihydropyridin-3-yl) benzonitrile], including its salts, isomers, and salts of isomers, into schedule III of the Controlled Substances Act (CSA). This scheduling action is pursuant to the CSA which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule III controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, or possess) or propose to handle perampanel. PMID:24294637

  7. Schedule of controlled substances: placement of tramadol into schedule IV. Final rule.

    PubMed

    2014-07-01

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration places the substance 2-[(dimethylamino)methyl]-1-(3-methoxyphenyl)cyclohexanol (tramadol), including its salts, isomers, and salts of isomers, into schedule IV of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule IV controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, or possess) or propose to handle tramadol. PMID:25016619

  8. Schedules of controlled substances: placement of suvorexant into Schedule IV. Final rule.

    PubMed

    2014-08-28

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance [(7R)-4-(5-chloro-1,3-benzoxazol-2-yl)-7-methyl-1,4-diazepan-1-yl][5-methyl-2-(2H-1,2,3-triazol-2-yl)phenyl]methanone (suvorexant), including its salts, isomers, and salts of isomers, into schedule IV of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule IV controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities, or possess), or propose to handle suvorexant. PMID:25167596

  9. Schedules of Controlled Substances: Placement of Eluxadoline Into Schedule IV. Final rule.

    PubMed

    2015-11-12

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration places the substance 5-[[[(2S)-2-amino-3-[4-aminocarbonyl)-2,6-dimethylphenyl]-1-oxopropyl][(1S)-1-(4-phenyl-1H-imidazol-2-yl)ethyl]amino]methyl]-2-methoxybenzoic acid (eluxadoline), including its salts, isomers, and salts of isomers, into schedule IV of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule IV controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities, or possess) or propose to handle eluxadoline. PMID:26567437

  10. Schedules of Controlled Substances: Placement of AH-7921 Into Schedule I. Final order.

    PubMed

    2016-04-14

    With the issuance of this final order, the Administrator of the Drug Enforcement Administration places the substance AH-7921 (Systematic IUPAC Name: 3,4-dichloro-N-[(1dimethylamino)cyclohexylmethyl]benzamide), including its isomers, esters, ethers, salts, and salts of isomers, esters and ethers, into schedule I of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act and is required in order for the United States to discharge its obligations under the Single Convention on Narcotic Drugs, 1961. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances on persons who handle (manufacture, distribute, import, export, engage in research or conduct instructional activities with, or possess), or propose to handle, AH-7921. PMID:27101639

  11. Phase II-I-II Study of Two Different Doses and Schedules of Pralatrexate, a High-Affinity Substrate for the Reduced Folate Carrier, in Patients With Relapsed or Refractory Lymphoma Reveals Marked Activity in T-Cell Malignancies

    PubMed Central

    O'Connor, Owen A.; Horwitz, Steven; Hamlin, Paul; Portlock, Carol; Moskowitz, Craig H.; Sarasohn, Debra; Neylon, Ellen; Mastrella, Jill; Hamelers, Rachel; MacGregor-Cortelli, Barbara; Patterson, Molly; Seshan, Venkatraman E.; Sirotnak, Frank; Fleisher, Martin; Mould, Diane R.; Saunders, Mike; Zelenetz, Andrew D.

    2009-01-01

    Purpose To determine the maximum-tolerated dose (MTD) and efficacy of pralatrexate in patients with lymphoma. Patients and Methods Pralatrexate, initially given at a dose of 135 mg/m2 on an every-other-week basis, was associated with stomatitis. A redesigned, weekly phase I/II study established an MTD of 30 mg/m2 weekly for six weeks every 7 weeks. Patients were required to have relapsed/refractory disease, an absolute neutrophil greater than 1,000/μL, and a platelet count greater than 50,000/μL for the first dose of any cycle. Results The every-other-week, phase II experience was associated with an increased risk of stomatitis and hematologic toxicity. On a weekly schedule, the MTD was 30 mg/m2 weekly for 6 weeks every 7 weeks. This schedule modification resulted in a 50% reduction in the major hematologic toxicities and abrogation of the grades 3 to 4 stomatitis. Stomatitis was associated with elevated homocysteine and methylmalonic acid, which were reduced by folate and vitamin B12 supplementation. Of 48 assessable patients, the overall response rate was 31% (26% by intention to treat), including 17% who experienced complete remission (CR). When analyzed by lineage, the overall response rates were 10% and 54% in patients with B- and T-cell lymphomas, respectively. All eight patients who experienced CR had T-cell lymphoma, and four of the six patients with a partial remission were positron emission tomography negative. The duration of responses ranged from 3 to 26 months. Conclusion Pralatrexate has significant single-agent activity in patients with relapsed/refractory T-cell lymphoma. PMID:19652067

  12. 20 CFR 411.560 - Is it possible to pay a milestone or outcome payment to more than one EN?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... (including a State VR agency acting as an EN) to receive payment based on the same milestone or outcome. If the beneficiary has assigned the ticket to more than one EN (or State VR agency acting as an EN) at different times, and more than one EN (or State VR agency) requests payment for the same milestone,...

  13. 20 CFR 411.560 - Is it possible to pay a milestone or outcome payment to more than one EN?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (including a State VR agency acting as an EN) to receive payment based on the same milestone or outcome. If the beneficiary has assigned the ticket to more than one EN (or State VR agency acting as an EN) at different times, and more than one EN (or State VR agency) requests payment for the same milestone,...

  14. 20 CFR 411.560 - Is it possible to pay a milestone or outcome payment to more than one EN?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... (including a State VR agency acting as an EN) to receive payment based on the same milestone or outcome. If the beneficiary has assigned the ticket to more than one EN (or State VR agency acting as an EN) at different times, and more than one EN (or State VR agency) requests payment for the same milestone,...

  15. 20 CFR 411.560 - Is it possible to pay a milestone or outcome payment to more than one EN?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (including a State VR agency acting as an EN) to receive payment based on the same milestone or outcome. If the beneficiary has assigned the ticket to more than one EN (or State VR agency acting as an EN) at different times, and more than one EN (or State VR agency) requests payment for the same milestone,...

  16. From Kissing to Coitus? Sex-of-Partner Differences in the Sexual Milestone Achievement of Young Men

    ERIC Educational Resources Information Center

    Smiler, Andrew P.; Frankel, Loren B. W.; Savin-Williams, Ritch C.

    2011-01-01

    Scientific information regarding normative patterns of young men's sexual behavior is insufficient, especially regarding the impact of sex of partner. We explored the age at which 255 young adult men achieved several milestones (e.g., first kiss, manual-genital contact, intercourse) as well as the sequence of milestone achievement and stability in…

  17. Brief Report: Ages of Language Milestones as Predictors of Developmental Trajectories in Young Children with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Kover, Sara T.; Edmunds, Sarah R.; Ellis Weismer, Susan

    2016-01-01

    Recognizing early risk markers in young children with autism spectrum disorder (ASD) is critical for timely diagnosis and intervention. The purpose of this study was to extend previous findings regarding language milestones to a longitudinal design, in which ages of expressive language milestones (i.e., first words, first phrases) could serve as…

  18. Autonomous power system: Integrated scheduling

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

  19. Milestones in plant sulfur research on sulfur-induced-resistance (SIR) in Europe.

    PubMed

    Bloem, Elke; Haneklaus, Silvia; Schnug, Ewald

    2014-01-01

    Until the 1970's of the last century sulfur (S) was mainly regarded as a pollutant being the main contributor of acid rain, causing forest dieback in central Europe. When Clean Air Acts came into force at the start of the 1980's SO2 contaminations in the air were consequently reduced within the next years. S changed from an unwanted pollutant into a lacking plant nutrient in agriculture since agricultural fields were no longer "fertilized" indirectly by industrial pollution. S deficiency was first noticed in Brassica crops that display an especially high S demand because of its content of S-containing secondary metabolites, the glucosinolates. In Scotland, where S depositions decreased even faster than in continental Europe, an increasing disease incidence with Pyrenopeziza brassicae was observed in oilseed rape in the beginning 1990's and the concept of sulfur-induced-resistance (SIR) was developed after a relationship between the S status and the disease incidence was uncovered. Since then a lot of research was carried out to unravel the background of SIR in the metabolism of agricultural crops and to identify metabolites, enzymes and reactions, which are potentially activated by the S metabolism to combat fungal pathogens. The S status of the crop is affecting many different plant features such as color and scent of flowers, pigments in leaves, metabolite concentrations and the release of gaseous S compounds which are directly influencing the desirability of a crop for a variety of different organisms from microorganisms, over insects and slugs to the point of grazing animals. The present paper is an attempt to sum up the knowledge about the effect of the S nutritional status of agricultural crops on parameters that are directly related to their health status and by this to SIR. Milestones in SIR research are compiled, open questions are addressed and future projections were developed. PMID:25642233

  20. Milestones in plant sulfur research on sulfur-induced-resistance (SIR) in Europe

    PubMed Central

    Bloem, Elke; Haneklaus, Silvia; Schnug, Ewald

    2015-01-01

    Until the 1970's of the last century sulfur (S) was mainly regarded as a pollutant being the main contributor of acid rain, causing forest dieback in central Europe. When Clean Air Acts came into force at the start of the 1980's SO2 contaminations in the air were consequently reduced within the next years. S changed from an unwanted pollutant into a lacking plant nutrient in agriculture since agricultural fields were no longer “fertilized” indirectly by industrial pollution. S deficiency was first noticed in Brassica crops that display an especially high S demand because of its content of S-containing secondary metabolites, the glucosinolates. In Scotland, where S depositions decreased even faster than in continental Europe, an increasing disease incidence with Pyrenopeziza brassicae was observed in oilseed rape in the beginning 1990's and the concept of sulfur-induced-resistance (SIR) was developed after a relationship between the S status and the disease incidence was uncovered. Since then a lot of research was carried out to unravel the background of SIR in the metabolism of agricultural crops and to identify metabolites, enzymes and reactions, which are potentially activated by the S metabolism to combat fungal pathogens. The S status of the crop is affecting many different plant features such as color and scent of flowers, pigments in leaves, metabolite concentrations and the release of gaseous S compounds which are directly influencing the desirability of a crop for a variety of different organisms from microorganisms, over insects and slugs to the point of grazing animals. The present paper is an attempt to sum up the knowledge about the effect of the S nutritional status of agricultural crops on parameters that are directly related to their health status and by this to SIR. Milestones in SIR research are compiled, open questions are addressed and future projections were developed. PMID:25642233

  1. Immunization Schedules for Infants and Children

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Infants and Children Recommend on Facebook ... any questions. View or Print a Schedule Recommended Immunizations for Children (Birth through 6 years) Schedule for ...

  2. A new model of scheduling in manufacturing: tasks, roles, and monitoring.

    PubMed

    Jackson, Sarah; Wilson, John R; MacCarthy, Bart L

    2004-01-01

    For over 3 decades there was a belief that computer-based solutions would "solve" complex industrial scheduling problems, yet most manufacturing organizations still require human contributions for effective scheduling performance. We present a new model of scheduling for the development and implementation of effective scheduling systems within manufacturing companies. The model derives from investigating the work of 7 schedulers in 4 manufacturing environments using a qualitative field study approach, for which novel field-based data collection and analysis methods were developed. The results show that scheduling in practice comprises task, role, and monitoring activities and that the business environment influences a scheduler at work. A new definition of scheduling is presented that includes the significant facilitation and implementation aspects of human scheduling ignored by many computer-based scheduling approaches. The implications for this model extend across the domains of human factors and operations management, especially for the analysis and improvement of existing and new production planning and control processes and enterprise information systems. Actual or potential applications of this research include the analysis, design, and management of planning, scheduling, and control processes in industry; the selection, training, and support of production schedulers; and the allocation of tasks to humans and computer systems in industrial planning, scheduling, and control processes. PMID:15573550

  3. Motor Milestone Development in Young Children with Autism Spectrum Disorders: An Exploratory Study

    ERIC Educational Resources Information Center

    Liu, Ting

    2012-01-01

    This study aimed to determine if a sample of children currently diagnosed with autism spectrum disorders (ASDs) would have shown motor milestone delays before age three as compared to typically developing children. Given delays in motor skills, the study also strived to determine which specific skills might be delayed. Parents of 44 children who…

  4. 20 CFR 411.535 - Under what circumstances will milestones be paid?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... beneficiary has assigned his or her ticket to the EN. See § 411.575 for other milestone payment criteria. ... earnings were less than the trial work level in each of the 18 months before the ticket was first assigned....500(f)) except as provided in § 411.536 (reconciliation payments). (ii) Significant work...

  5. Sexual Orientation Identity Formation among Gay, Lesbian, and Bisexual Youths: Multiple Patterns of Milestone Experiences.

    ERIC Educational Resources Information Center

    Floyd, Frank J.; Stein, Terry S.

    2002-01-01

    Examined variations in "coming out" for gay, lesbian, and bisexual youths, specifically: the timing and sequence of developmental stages; completion of 10 milestone events involving self-awareness, sexual experiences, and disclosure to others; and immersion in social networks. Found comfort with sexual orientation was greatest in persons with…

  6. Relations of Alcohol Consumption with Smoking Cessation Milestones and Tobacco Dependence

    ERIC Educational Resources Information Center

    Cook, Jessica W.; Fucito, Lisa M.; Piasecki, Thomas M.; Piper, Megan E.; Schlam, Tanya R.; Berg, Kristin M.; Baker, Timothy B.

    2012-01-01

    Objective: Alcohol consumption is associated with smoking cessation failure in both community and clinical research. However, little is known about the relation between alcohol consumption and smoking cessation milestones (i.e., achieving initial abstinence, avoiding lapses and relapse). Our objective in this research was to examine the relations…

  7. 20 CFR 411.540 - How are the payment amounts calculated for each of the milestones?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false How are the payment amounts calculated for each of the milestones? 411.540 Section 411.540 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Employment Network Payment Systems § 411.540 How are...

  8. 20 CFR 411.540 - How are the payment amounts calculated for each of the milestones?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false How are the payment amounts calculated for each of the milestones? 411.540 Section 411.540 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Employment Network Payment Systems § 411.540 How are...

  9. 20 CFR 411.540 - How are the payment amounts calculated for each of the milestones?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false How are the payment amounts calculated for each of the milestones? 411.540 Section 411.540 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Employment Network Payment Systems § 411.540 How are...

  10. 20 CFR 411.540 - How are the payment amounts calculated for each of the milestones?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false How are the payment amounts calculated for each of the milestones? 411.540 Section 411.540 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Employment Network Payment Systems § 411.540 How are...

  11. 20 CFR 411.540 - How are the payment amounts calculated for each of the milestones?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false How are the payment amounts calculated for each of the milestones? 411.540 Section 411.540 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Employment Network Payment Systems § 411.540 How are...

  12. Puberty: Maturation, Timing and Adjustment, and Sexual Identity Developmental Milestones among Lesbian, Gay, and Bisexual Youth

    ERIC Educational Resources Information Center

    Grossman, Arnold H.; Foss, Alexander H.; D'Augelli, Anthony R.

    2014-01-01

    This study examined pubertal maturation, pubertal timing and outcomes, and the relationship of puberty and sexual identity developmental milestones among 507 lesbian, gay, and bisexual youth. The onset of menarche and spermarche occurred at the mean ages of 12.05 and 12.46, respectively. There was no statistically significant difference in…

  13. Analyzing Milestones in Smoking Cessation: Illustration in a Nicotine Patch Trial in Adult Smokers

    ERIC Educational Resources Information Center

    Shiffman, Saul; Scharf, Deborah M.; Shadel, William G.; Gwaltney, Chad J.; Dang, Qianyu; Paton, Stephanie M.; Clark, Duncan B.

    2006-01-01

    Tests of addiction treatments seldom reveal where treatment exercises its effect (i.e., promoting initial abstinence, preventing lapses, and/or impeding progression from lapse to relapse). The authors illustrate analyses distinguishing effects on these milestones in a randomized trial of high-dose nicotine patch (35 mg; n = 188) versus placebo (n…

  14. Milestones in the Secondary English Curriculum in the United States. ICTE Occasional Paper No. 11.

    ERIC Educational Resources Information Center

    Bleakley, Lou Ann

    Written for students pursuing graduate study, this chronological table lists landmark publications in the secondary English curriculum occurring between 1893 and 1971. For each of the 27 milestones--e.g., "Report of the Committee of Ten on Secondary School Studies" (1893), "Teaching Creative Writing" by Lawrence Conrad (1937), "The Uses of…

  15. Providing lipid-based nutrient supplements does not affect developmental milestones among Malawian children

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Our objective was to assess whether using lipid-based nutrient supplements (LNS) to complement the diets of infants and young children affected when they achieved selected developmental milestones. In rural Malawi, 840 6-month-old healthy infants were enrolled to a randomised trial. Control particip...

  16. From Early to Current Developments in Online Learning at Nova Southeastern University: Reflections on Historical Milestones.

    ERIC Educational Resources Information Center

    Dringus, Laurie P.; Scigliano, John A.

    2000-01-01

    Traces the major historical milestones achieved by Nova Southeastern University in its pioneering of graduate level online learning programs. Highlights include delivery systems; Web-based electronic classrooms; overview of the technology, including telecommunications through UNIX; evaluation and research; and technology used in the School of…

  17. 32 CFR 37.575 - What are my responsibilities for determining milestone payment amounts?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false What are my responsibilities for determining milestone payment amounts? 37.575 Section 37.575 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award...

  18. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  19. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  20. Schedule-Report-Generator Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Report Generator provides simple method for generating periodic schedule reports. Enables engineering manager to monitor tasks assigned to staff members on weekly basis. Sorts three types of reports by use of one or more data fields as sorting keys. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  1. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  2. 29 CFR 1952.221 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Tennessee § 1952.221 Developmental schedule. The Tennessee state plan is developmental. The following is the developmental schedule...

  3. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  4. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  5. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  6. Automating Deep Space Network scheduling and conflict resolution

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Clement, Bradley

    2005-01-01

    The Deep Space Network (DSN) is a central part of NASA's infrastructure for communicating with active space missions, from earth orbit to beyond the solar system. We describe our recent work in modeling the complexities of user requirements, and then scheduling and resolving conflicts on that basis. We emphasize our innovative use of background 'intelligent' assistants' that carry out search asynchrnously while the user is focusing on various aspects of the schedule.

  7. Non-clairvoyant Scheduling Games

    NASA Astrophysics Data System (ADS)

    Dürr, Christoph; Nguyen, Kim Thang

    In a scheduling game, each player owns a job and chooses a machine to execute it. While the social cost is the maximal load over all machines (makespan), the cost (disutility) of each player is the completion time of its own job. In the game, players may follow selfish strategies to optimize their cost and therefore their behaviors do not necessarily lead the game to an equilibrium. Even in the case there is an equilibrium, its makespan might be much larger than the social optimum, and this inefficiency is measured by the price of anarchy - the worst ratio between the makespan of an equilibrium and the optimum. Coordination mechanisms aim to reduce the price of anarchy by designing scheduling policies that specify how jobs assigned to a same machine are to be scheduled. Typically these policies define the schedule according to the processing times as announced by the jobs. One could wonder if there are policies that do not require this knowledge, and still provide a good price of anarchy. This would make the processing times be private information and avoid the problem of truthfulness. In this paper we study these so-called non-clairvoyant policies. In particular, we study the RANDOM policy that schedules the jobs in a random order without preemption, and the EQUI policy that schedules the jobs in parallel using time-multiplexing, assigning each job an equal fraction of CPU time.

  8. Developing an Experiential Learning Program: Milestones and Challenges

    ERIC Educational Resources Information Center

    Austin, M. Jill; Rust, Dianna Zeh

    2015-01-01

    College and University faculty members have increasingly adopted experiential learning teaching methods that are designed to engage students in the learning process. Experiential learning is simply defined as "hands-on" learning and may involve any of the following activities: service learning, applied learning in the discipline,…

  9. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Internal Revenue Service Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and... With Total Assets of $10 Million or More, and Schedule K-1 (Form 1120S), Shareholder's Share of Income... Losses and Built-in Gains, Schedule K-1 (Form 1120S), Shareholder's Share of Income, Credits,...

  10. Schedules of controlled substances: rescheduling of buprenorphine from schedule V to schedule III. Final rule.

    PubMed

    2002-10-01

    This final rule is issued by the Deputy Administrator of the Drug Enforcement Administration (DEA) to reschedule buprenorphine from a Schedule V narcotic to a Schedule III narcotic under the Controlled Substances Act (CSA). This action is based on a rescheduling recommendation by the Department of Health and Human Services (DHHS) and a DEA review indicating that buprenorphine meets the criteria of a Schedule III narcotic. The DEA published a proposed rule to reschedule buprenorphine on March 21, 2002 (67 FR 13114). The comment period was extended for an additional 30 days until May 22, 2002 (67 FR 20072). The DEA received ten comments but no requests for hearings. This final action will impose the regulatory controls and criminal sanctions of a Schedule III narcotic on those persons who handle buprenorphine or products containing buprenorphine PMID:12369590

  11. 10 CFR Appendix B to 10 Cfr Part 2 - Model Milestones To Be Used By a Presiding Officer as a Guideline in Developing a Hearing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Conduct of an Adjudicatory Proceeding in Accordance With 10 CFR 2.332. I. Model Milestones for a Hearing on an Enforcement Action Conducted Under 10 CFR Part 2, Subpart G These model milestones would... adjudicated in the proceeding. The model milestones are based on the Commission's Rules of Practice in 10...

  12. Visualization on supercomputing platform level II ASC milestone (3537-1B) results from Sandia.

    SciTech Connect

    Geveci, Berk; Fabian, Nathan; Marion, Patrick; Moreland, Kenneth D.

    2010-09-01

    This report provides documentation for the completion of the Sandia portion of the ASC Level II Visualization on the platform milestone. This ASC Level II milestone is a joint milestone between Sandia National Laboratories and Los Alamos National Laboratories. This milestone contains functionality required for performing visualization directly on a supercomputing platform, which is necessary for peta-scale visualization. Sandia's contribution concerns in-situ visualization, running a visualization in tandem with a solver. Visualization and analysis of petascale data is limited by several factors which must be addressed as ACES delivers the Cielo platform. Two primary difficulties are: (1) Performance of interactive rendering, which is most computationally intensive portion of the visualization process. For terascale platforms, commodity clusters with graphics processors(GPUs) have been used for interactive rendering. For petascale platforms, visualization and rendering may be able to run efficiently on the supercomputer platform itself. (2) I/O bandwidth, which limits how much information can be written to disk. If we simply analyze the sparse information that is saved to disk we miss the opportunity to analyze the rich information produced every timestep by the simulation. For the first issue, we are pursuing in-situ analysis, in which simulations are coupled directly with analysis libraries at runtime. This milestone will evaluate the visualization and rendering performance of current and next generation supercomputers in contrast to GPU-based visualization clusters, and evaluate the performance of common analysis libraries coupled with the simulation that analyze and write data to disk during a running simulation. This milestone will explore, evaluate and advance the maturity level of these technologies and their applicability to problems of interest to the ASC program. Scientific simulation on parallel supercomputers is traditionally performed in four

  13. Plug-In Hybrid Vehicle Analysis (Milestone Report)

    SciTech Connect

    Markel, T.; Brooker, A.; Gonder, J.; O'Keefe, M.; Simpson, A.; Thornton, M.

    2006-11-01

    NREL's plug-in hybrid electric vehicle (PHEV) analysis activities made great strides in FY06 to objectively assess PHEV technology, support the larger U.S. Department of Energy PHEV assessment effort, and share technical knowledge with the vehicle research community and vehicle manufacturers. This report provides research papers and presentations developed in FY06 to support these efforts. The report focuses on the areas of fuel economy reporting methods, cost and consumption benefit analysis, real-world performance expectations, and energy management strategies.

  14. Evaluation of 4 X 4 Block Schedule.

    ERIC Educational Resources Information Center

    Mutter, Davida W.; And Others

    1997-01-01

    Describes 4 X 4 block scheduling and its advantages and disadvantages. Examines block scheduling's effects on a Virginia high school's students, teachers, and administration, based on school data and survey results. Most participants preferred block scheduling over the six-period schedule. Grades, attendance, and discipline improved; students…

  15. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at..., or storing property at the marine terminal contained in a terminal schedule must be consistent...

  16. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at..., or storing property at the marine terminal contained in a terminal schedule must be consistent...

  17. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at..., or storing property at the marine terminal contained in a terminal schedule must be consistent...

  18. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at..., or storing property at the marine terminal contained in a terminal schedule must be consistent...

  19. Flexible Scheduling to Fit the Firefighters.

    ERIC Educational Resources Information Center

    Cox, Clarice Robinson

    Three flexible scheduling plans were tried in order that firefighters could take regular college courses despite their 24 hours on the 24 off work schedule. Plan one scheduled the firefighters into a regular Monday-Wednesday-Friday class which they attended every other week, making up missed material outside of class. Plan two scheduled special…

  20. Block Scheduling's Missteps, Successes and Variables.

    ERIC Educational Resources Information Center

    Rettig, Michael D.; Canady, Robert Lynn

    2003-01-01

    Documents Virginia's history of adoption and implementation of block scheduling, highlights common forms of block scheduling, and describes mistakes that caused schools to abandon block scheduling. Describes three key variables (time, teachers, and students) in the use of block scheduling to improve student achievement. (PKP)

  1. Prioritizing sleep for healthy work schedules

    PubMed Central

    2012-01-01

    Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work). Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules. PMID:22738292

  2. Milestones in Functional Titanium Dioxide Thermal Spray Coatings: A Review

    NASA Astrophysics Data System (ADS)

    Gardon, M.; Guilemany, J. M.

    2014-04-01

    Titanium dioxide has been the most investigated metal oxide due to its outstanding performance in a wide range of applications, chemical stability and low cost. Coating processes that can produce surfaces based on this material have been deeply studied. Nevertheless, the necessity of coating large areas by means of rapid manufacturing processes renders laboratory-scale techniques unsuitable, leading to a noteworthy interest from the thermal spray (TS) community in the development of significant intellectual property and a large number of scientific publications. This review unravels the relationship between titanium dioxide and TS technologies with the aim of providing detailed information related to the most significant achievements, lack of knowhow, and performance of TS TiO2 functional coatings in photocatalytic, biomedical, and other applications. The influence of thermally activated techniques such as atmospheric plasma spray and high-velocity oxygen fuel spray on TiO2 feedstock based on powders and suspensions is revised; the influence of spraying parameters on the microstructural and compositional changes and the final active behavior of the coating have been analyzed. Recent findings on titanium dioxide coatings deposited by cold gas spray and the capacity of this technology to prevent loss of the nanostructured anatase metastable phase are also reviewed.

  3. Predit: A temporal predictive framework for scheduling systems

    NASA Technical Reports Server (NTRS)

    Paolucci, E.; Patriarca, E.; Sem, M.; Gini, G.

    1992-01-01

    Scheduling can be formalized as a Constraint Satisfaction Problem (CSP). Within this framework activities belonging to a plan are interconnected via temporal constraints that account for slack among them. Temporal representation must include methods for constraints propagation and provide a logic for symbolic and numerical deductions. In this paper we describe a support framework for opportunistic reasoning in constraint directed scheduling. In order to focus the attention of an incremental scheduler on critical problem aspects, some discrete temporal indexes are presented. They are also useful for the prediction of the degree of resources contention. The predictive method expressed through our indexes can be seen as a Knowledge Source for an opportunistic scheduler with a blackboard architecture.

  4. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  5. Batch Scheduling a Fresh Approach

    NASA Technical Reports Server (NTRS)

    Cardo, Nicholas P.; Woodrow, Thomas (Technical Monitor)

    1994-01-01

    The Network Queueing System (NQS) was designed to schedule jobs based on limits within queues. As systems obtain more memory, the number of queues increased to take advantage of the added memory resource. The problem now becomes too many queues. Having a large number of queues provides users with the capability to gain an unfair advantage over other users by tailoring their job to fit in an empty queue. Additionally, the large number of queues becomes confusing to the user community. The High Speed Processors group at the Numerical Aerodynamics Simulation (NAS) Facility at NASA Ames Research Center developed a new approach to batch job scheduling. This new method reduces the number of queues required by eliminating the need for queues based on resource limits. The scheduler examines each request for necessary resources before initiating the job. Also additional user limits at the complex level were added to provide a fairness to all users. Additional tools which include user job reordering are under development to work with the new scheduler. This paper discusses the objectives, design and implementation results of this new scheduler

  6. Concurrent-schedule performance in dairy cows: persistent undermatching.

    PubMed

    Foster, T M; Temple, W; Robertson, B; Nair, V; Poling, A

    1996-01-01

    Performance of dairy cows responding under concurrent variable-interval variable-interval schedules of food delivery was examined, with results analyzed in terms of the generalized matching equation. In Experiment 1, bias measures indicated that crushed barley was preferred over meatmeal when these foods were available under the alternative schedules. For whole-session data, substantial undermatching of response and time-allocation ratios to obtained reinforcement ratios was evident. Postreinforcement pause time ratios approximately matched obtained reinforcement rates. Subtracting these times from total time-allocation values yielded net time-allocation ratios that undermatched obtained reinforcement ratios to a greater degree than did whole-session time-allocation ratios. In Experiment 2, substantial undermatching was evident when the same foods (hay for 2 cows, crushed barley for 2 others) were available under the alternative schedules. Food-related activities and other defined behavior not related to food were quantified by direct observation, and were found to occupy a substantial proportion (roughly 40% to 80%) of experimental sessions. Subtracting the time spent in these activities from the time allocated to each component schedule did not reduce the degree of undermatching obtained. Across all conditions in both experiments, slopes of regression lines relating behavioral outputs to environmental inputs characteristically were below 0.6, which agrees with prior findings and suggests that, contrary to suggestions in the literature, undermatching in dairy cows is not the result of using different foods under alternative schedules or differential pausing under those schedules. PMID:8583205

  7. Artificial intelligence approaches to astronomical observation scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  8. Scheduling and process migration in partitioned multiprocessors

    SciTech Connect

    Gait, J. )

    1990-03-01

    A partitioned multiprocessor (PM) has a shared global bus and nonshared local memories. This paper studies a process scheduler, called the two-tier scheduler (TTS), for a PM. In a PM local scheduling amortizes the cost of loading processes in local memory. Global scheduling migrates processes to balance load. A tunable time quantum is adjusted so the average process completes execution on the processor on which it is first scheduled, and only relatively long lived processes are rescheduled globally.

  9. Plan and schedule for disposition and regulatory compliance for miscellaneous streams. Revision 1

    SciTech Connect

    1994-12-01

    On December 23, 1991, the U.S. Department of Energy, Richland Operations Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM-177 (Consent Order). The Consent Order lists regulatory milestones for liquid effluent streams at the Hanford Site to comply with the permitting requirements of Washington Administrative Code (WAC) 173-216 (State Waste Discharge Permit Program) or WAC 173-218 (Washington Underground Injection Control Program) where applicable. Hanford Site liquid effluent streams discharging to the soil column have been categorized in the Consent Order as follows: Phase I Streams Phase II Streams Miscellaneous Streams. Phase I and Phase II Streams are addressed in two RL reports: {open_quotes}Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site{close_quotes} (DOE-RL 1987), and {open_quotes}Annual Status of the Report of the Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site{close_quotes}. Miscellaneous Streams are those liquid effluent streams discharged to the ground that are not categorized as Phase I or Phase II Streams. Miscellaneous Streams discharging to the soil column at the Hanford Site are subject to the requirements of several milestones identified in the Consent Order. This document provides a plan and schedule for the disposition of Miscellaneous Streams. The disposition process for the Miscellaneous Streams is facilitated using a decision tree format. The decision tree and corresponding analysis for determining appropriate disposition of these streams is presented in this document.

  10. Cornerstone Documents, Milestones, and Policies: Shaping the Direction of Public Health Nursing 1890-1950.

    PubMed

    Kub, Joan; Kulbok, Pamela A; Glick, Doris

    2015-01-01

    The interplay of policy, milestone events, and cornerstone documents was critical in the evolution of the specialty of public health nursing (PHN) from 1890-1950. Using our contemporary lens, this article examines PHN development from an historical perspective, including events and milestones driving growth in the early 20th century. Some of the challenges faced by our founding public health nursing leadership are not unlike challenges we face today. In 1950, Ruth Hubbard, a former leader in the National Organization of Public Health Nurses and Director of the Visiting Nurse Society of Philadelphia, spoke of the value of examining the past to forge a new future. This article calls for contemporary public health nurses to act upon the lessons learned from the past, to strengthen the renewed focus on prevention, to develop policies that impact population health, and to foster a vision that will guide us into the future. PMID:26882422

  11. Milestones in Software Engineering and Knowledge Engineering History: A Comparative Review

    PubMed Central

    del Águila, Isabel M.; Palma, José; Túnez, Samuel

    2014-01-01

    We present a review of the historical evolution of software engineering, intertwining it with the history of knowledge engineering because “those who cannot remember the past are condemned to repeat it.” This retrospective represents a further step forward to understanding the current state of both types of engineerings; history has also positive experiences; some of them we would like to remember and to repeat. Two types of engineerings had parallel and divergent evolutions but following a similar pattern. We also define a set of milestones that represent a convergence or divergence of the software development methodologies. These milestones do not appear at the same time in software engineering and knowledge engineering, so lessons learned in one discipline can help in the evolution of the other one. PMID:24624046

  12. Milestones in software engineering and knowledge engineering history: a comparative review.

    PubMed

    del Águila, Isabel M; Palma, José; Túnez, Samuel

    2014-01-01

    We present a review of the historical evolution of software engineering, intertwining it with the history of knowledge engineering because "those who cannot remember the past are condemned to repeat it." This retrospective represents a further step forward to understanding the current state of both types of engineerings; history has also positive experiences; some of them we would like to remember and to repeat. Two types of engineerings had parallel and divergent evolutions but following a similar pattern. We also define a set of milestones that represent a convergence or divergence of the software development methodologies. These milestones do not appear at the same time in software engineering and knowledge engineering, so lessons learned in one discipline can help in the evolution of the other one. PMID:24624046

  13. Post-processing V&V level II ASC milestone (2360) results.

    SciTech Connect

    Chavez, Elmer; Karelitz, David B.; Brunner, Thomas A.; Trucano, Timothy Guy; Moreland, Kenneth D.; Weirs, V. Gregory; Shead, Timothy M.

    2007-09-01

    The 9/30/2007 ASC Level 2 Post-Processing V&V Milestone (Milestone 2360) contains functionality required by the user community for certain verification and validation tasks. These capabilities include loading of edge and face data on an Exodus mesh, run-time computation of an exact solution to a verification problem, delivery of results data from the server to the client, computation of an integral-based error metric, simultaneous loading of simulation and test data, and comparison of that data using visual and quantitative methods. The capabilities were tested extensively by performing a typical ALEGRA HEDP verification task. In addition, a number of stretch criteria were met including completion of a verification task on a 13 million element mesh.

  14. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  15. The early antibiotic therapy in septic patients--milestone or sticking point?

    PubMed

    Bernhard, Michael; Lichtenstern, Christoph; Eckmann, Christian; Weigand, Markus A

    2014-01-01

    Sepsis is one of the oldest and most elusive syndromes in medicine. Every effort should be made to treat these patients with the best available evidence. As a milestone, empiric antimicrobial therapy is essential in order to reduce morbidity and mortality of septic patients. As a sticking point, the use of broad-spectrum antimicrobial agents may be associated with induction of resistance among common pathogens. PMID:25672873

  16. Apollo experience report the command and service module milestone review process

    NASA Technical Reports Server (NTRS)

    Brendle, H. L.; York, J. A.

    1974-01-01

    The sequence of the command and service module milestone review process is given, and the Customer Acceptance Readiness Review and Flight Readiness Review plans are presented. Contents of the System Summary Acceptance Documents for the two formal spacecraft reviews are detailed, and supplemental data required for presentation to the review boards are listed. Typical forms, correspondence, supporting documentation, and minutes of a board meeting are included.

  17. Yang-Mills Theory at 60: Milestones, Landmarks and Interesting Questions

    NASA Astrophysics Data System (ADS)

    Chau, Ling-Lie

    On the auspicious occasion of celebrating the 60th anniversary of the Yang-Mills theory, and Professor Yang's many other important contributions to physics and mathematics, I will highlight the impressive milestones and landmarks that have been established in the last 60 years, as well as some interesting questions that are worthy of answers from future researches. The paper is written (without equations) for the interest of non-scientists as well as of scientists.

  18. Yang-Mills theory at 60: Milestones, landmarks and interesting questions

    NASA Astrophysics Data System (ADS)

    Chau, Ling-Lie

    2015-12-01

    On the auspicious occasion of celebrating the 60th anniversary of the Yang-Mills theory, and Professor Yang’s many other important contributions to physics and mathematics, I will highlight the impressive milestones and landmarks that have been established in the last 60 years, as well as some interesting questions that still lie before us. The paper is written (without equations) for the interest of non-scientists as well as of scientists.

  19. Optimal randomized scheduling by replacement

    SciTech Connect

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  20. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  1. Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

  2. Scheduler software for tracking and data relay satellite system loading analysis: User manual and programmer guide

    NASA Technical Reports Server (NTRS)

    Craft, R.; Dunn, C.; Mccord, J.; Simeone, L.

    1980-01-01

    A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.

  3. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    NASA Technical Reports Server (NTRS)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  4. RAVEN. Dynamic Event Tree Approach Level III Milestone

    SciTech Connect

    Alfonsi, Andrea; Rabiti, Cristian; Mandelli, Diego; Cogliati, Joshua; Kinoshita, Robert

    2014-07-01

    Conventional Event-Tree (ET) based methodologies are extensively used as tools to perform reliability and safety assessment of complex and critical engineering systems. One of the disadvantages of these methods is that timing/sequencing of events and system dynamics are not explicitly accounted for in the analysis. In order to overcome these limitations several techniques, also know as Dynamic Probabilistic Risk Assessment (DPRA), have been developed. Monte-Carlo (MC) and Dynamic Event Tree (DET) are two of the most widely used D-PRA methodologies to perform safety assessment of Nuclear Power Plants (NPP). In the past two years, the Idaho National Laboratory (INL) has developed its own tool to perform Dynamic PRA: RAVEN (Reactor Analysis and Virtual control ENvironment). RAVEN has been designed to perform two main tasks: 1) control logic driver for the new Thermo-Hydraulic code RELAP-7 and 2) post-processing tool. In the first task, RAVEN acts as a deterministic controller in which the set of control logic laws (user defined) monitors the RELAP-7 simulation and controls the activation of specific systems. Moreover, the control logic infrastructure is used to model stochastic events, such as components failures, and perform uncertainty propagation. Such stochastic modeling is deployed using both MC and DET algorithms. In the second task, RAVEN processes the large amount of data generated by RELAP-7 using data-mining based algorithms. This report focuses on the analysis of dynamic stochastic systems using the newly developed RAVEN DET capability. As an example, a DPRA analysis, using DET, of a simplified pressurized water reactor for a Station Black-Out (SBO) scenario is presented.

  5. RAVEN: Dynamic Event Tree Approach Level III Milestone

    SciTech Connect

    Andrea Alfonsi; Cristian Rabiti; Diego Mandelli; Joshua Cogliati; Robert Kinoshita

    2013-07-01

    Conventional Event-Tree (ET) based methodologies are extensively used as tools to perform reliability and safety assessment of complex and critical engineering systems. One of the disadvantages of these methods is that timing/sequencing of events and system dynamics are not explicitly accounted for in the analysis. In order to overcome these limitations several techniques, also know as Dynamic Probabilistic Risk Assessment (DPRA), have been developed. Monte-Carlo (MC) and Dynamic Event Tree (DET) are two of the most widely used D-PRA methodologies to perform safety assessment of Nuclear Power Plants (NPP). In the past two years, the Idaho National Laboratory (INL) has developed its own tool to perform Dynamic PRA: RAVEN (Reactor Analysis and Virtual control ENvironment). RAVEN has been designed to perform two main tasks: 1) control logic driver for the new Thermo-Hydraulic code RELAP-7 and 2) post-processing tool. In the first task, RAVEN acts as a deterministic controller in which the set of control logic laws (user defined) monitors the RELAP-7 simulation and controls the activation of specific systems. Moreover, the control logic infrastructure is used to model stochastic events, such as components failures, and perform uncertainty propagation. Such stochastic modeling is deployed using both MC and DET algorithms. In the second task, RAVEN processes the large amount of data generated by RELAP-7 using data-mining based algorithms. This report focuses on the analysis of dynamic stochastic systems using the newly developed RAVEN DET capability. As an example, a DPRA analysis, using DET, of a simplified pressurized water reactor for a Station Black-Out (SBO) scenario is presented.

  6. Planning for Pre-Exascale Platform Environment (Fiscal Year 2015 Level 2 Milestone 5216)

    SciTech Connect

    Springmeyer, R.; Lang, M.; Noe, J.

    2015-09-28

    This Plan for ASC Pre-Exascale Platform Environments document constitutes the deliverable for the fiscal year 2015 (FY15) Advanced Simulation and Computing (ASC) Program Level 2 milestone Planning for Pre-Exascale Platform Environment. It acknowledges and quantifies challenges and recognized gaps for moving the ASC Program towards effective use of exascale platforms and recommends strategies to address these gaps. This document also presents an update to the concerns, strategies, and plans presented in the FY08 predecessor document that dealt with the upcoming (at the time) petascale high performance computing (HPC) platforms. With the looming push towards exascale systems, a review of the earlier document was appropriate in light of the myriad architectural choices currently under consideration. The ASC Program believes the platforms to be fielded in the 2020s will be fundamentally different systems that stress ASC’s ability to modify codes to take full advantage of new or unique features. In addition, the scale of components will increase the difficulty of maintaining an errorfree system, thus driving new approaches to resilience and error detection/correction. The code revamps of the past, from serial- to vector-centric code to distributed memory to threaded implementations, will be revisited as codes adapt to a new message passing interface (MPI) plus “x” or more advanced and dynamic programming models based on architectural specifics. Development efforts are already underway in some cases, and more difficult or uncertain aspects of the new architectures will require research and analysis that may inform future directions for program choices. In addition, the potential diversity of system architectures may require parallel if not duplicative efforts to analyze and modify environments, codes, subsystems, libraries, debugging tools, and performance analysis techniques as well as exploring new monitoring methodologies. It is difficult if not impossible to

  7. Hubble Systems Optimize Hospital Schedules

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Don Rosenthal, a former Ames Research Center computer scientist who helped design the Hubble Space Telescope's scheduling software, co-founded Allocade Inc. of Menlo Park, California, in 2004. Allocade's OnCue software helps hospitals reclaim unused capacity and optimize constantly changing schedules for imaging procedures. After starting to use the software, one medical center soon reported noticeable improvements in efficiency, including a 12 percent increase in procedure volume, 35 percent reduction in staff overtime, and significant reductions in backlog and technician phone time. Allocade now offers versions for outpatient and inpatient magnetic resonance imaging (MRI), ultrasound, interventional radiology, nuclear medicine, Positron Emission Tomography (PET), radiography, radiography-fluoroscopy, and mammography.

  8. A planning and scheduling lexicon

    NASA Technical Reports Server (NTRS)

    Cruz, Jennifer W.; Eggemeyer, William C.

    1989-01-01

    A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.

  9. Collaborative Negotiations: A Successful Approach for Negotiation Compliance Milestones for the transition of the PFP Hanford Nuclear Reservation

    SciTech Connect

    HOPKINS, A.M.

    2003-02-01

    The new approach to negotiations was termed collaborative (win-win) rather than positional (win-lose). Collaborative negotiations were conducted to establish milestones for the decommissioning of the Plutonium Finishing Plant, PFP.

  10. 20 CFR 411.580 - Can an EN receive payments for milestones or outcome payment months that occur before the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....580 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Employment Network Payment Systems § 411.580 Can an EN receive payments for milestones or outcome...

  11. Milestones in Medical Research, The Human Genome and ClinicalTrials.gov | NIH MedlinePlus the Magazine

    MedlinePlus

    ... first, a major milestone in understanding the genetic foundation of all human beings; the second, a comprehensive ... out more about the importance of clinical trials starting on page 4 . Our cover story in this ...

  12. Enhanced Memetic Algorithm for Task Scheduling

    NASA Astrophysics Data System (ADS)

    Padmavathi, S.; Shalinie, S. Mercy; Someshwar, B. C.; Sasikumar, T.

    Scheduling tasks onto the processors of a parallel system is a crucial part of program parallelization. Due to the NP-hardness of the task scheduling problem, scheduling algorithms are based on heuristics that try to produce good rather than optimal schedules. This paper proposes a Memetic algorithm with Tabu search and Simulated Annealing as local search for solving Task scheduling problem considering communication contention. This problem consists of finding a schedule for a general task graph to be executed on a cluster of workstations and hence the schedule length can be minimized. Our approach combines local search (by self experience) and global search (by neighboring experience) possessing high search efficiency. The proposed approach is compared with existing list scheduling heuristics. The numerical results clearly indicate that our proposed approach produces solutions which are closer to optimality and/or better quality than the existing list scheduling heuristics.

  13. Intelligent perturbation algorithms for space scheduling optimization

    NASA Technical Reports Server (NTRS)

    Kurtzman, Clifford R.

    1991-01-01

    Intelligent perturbation algorithms for space scheduling optimization are presented in the form of the viewgraphs. The following subject areas are covered: optimization of planning, scheduling, and manifesting; searching a discrete configuration space; heuristic algorithms used for optimization; use of heuristic methods on a sample scheduling problem; intelligent perturbation algorithms are iterative refinement techniques; properties of a good iterative search operator; dispatching examples of intelligent perturbation algorithm and perturbation operator attributes; scheduling implementations using intelligent perturbation algorithms; major advances in scheduling capabilities; the prototype ISF (industrial Space Facility) experiment scheduler; optimized schedule (max revenue); multi-variable optimization; Space Station design reference mission scheduling; ISF-TDRSS command scheduling demonstration; and example task - communications check.

  14. 1996 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-10-01

    Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

  15. Reframing Class Scheduling: Seven School Counselor Benefits, Challenges, Considerations, and Recommendations

    ERIC Educational Resources Information Center

    Wines, Lisa; Nelson, Judith A.; Eckstein, Daniel

    2007-01-01

    The American School Counseling Association (ASCA) identifies scheduling students for classes as a non-counseling activity. Ideally, school counselors should limit non-counseling activities, but the reality is that counselors do in fact spend much time and energy scheduling classes, according to a recent survey of secondary counselors. We introduce…

  16. Radiosensitizing Properties of Bortezomib Depend on Therapeutic Schedule

    SciTech Connect

    Labussiere, Marianne; Pinel, Sophie; Vandamme, Marc; Plenat, Francois; Chastagner, Pascal

    2011-03-01

    Purpose: To investigate the influence of the bortezomib (BTZ) on malignant glioma radiosensitivity in two xenograft models. Methods and Materials: For TCG3 and U87 models, we evaluated the antitumor activity of BTZ, radiotherapy, and BTZ plus radiothearapy according to two therapeutic schedules: a 'nonfractionated' schedule corresponding to a single dose of treatment per week, and a 'fractionated' schedule corresponding to the same weekly dose divided into 5 fractions. Treatments influence on proliferation and apoptosis indexes, cell cycle distribution, and nuclear factor-{kappa}B pathway were explored. Results: The radiosensitizing properties of BTZ observed with the nonfractionated schedule were lost with the fractionated schedule. Bortezomib-mediated radiosensitization was associated with an increased apoptosis response and major changes in cell proliferation, but the nuclear factor-{kappa}B pathway was not involved. Most of the cellular effects induced by BTZ when tumors received a single irradiation were cancelled out if radiotherapy was fractionated. Conclusion: The influence of BTZ on glioma radiosensitivity seems to depend on the treatment fractionation schedule, emphasizing the need to clarify the mechanisms underlying BTZ's radiosensitizing effects before further clinical trials are initiated.

  17. 15 CFR Supplement No. 2 to Part 713 - Deadlines for Submission of Schedule 2 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical... exports or imports of a Schedule 2 chemical by a plant site, trading company, or other person subject...

  18. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2... Schedule 3 chemical exceeded the declaration threshold in § 714.1(a)(1)(i) of the CWCR. Annual Report on... year in which exports or imports of a Schedule 3 chemical by a plant site, trading company, or...

  19. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2... Schedule 3 chemical exceeded the declaration threshold in § 714.1(a)(1)(i) of the CWCR. Annual Report on... year in which exports or imports of a Schedule 3 chemical by a plant site, trading company, or...

  20. 15 CFR Supplement No. 2 to Part 713 - Deadlines for Submission of Schedule 2 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical... exports or imports of a Schedule 2 chemical by a plant site, trading company, or other person subject...

  1. 15 CFR Supplement No. 2 to Part 714 - Deadlines for Submission of Schedule 3 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS Pt. 714, Supp. 2... Schedule 3 chemical exceeded the declaration threshold in § 714.1(a)(1)(i) of the CWCR. Annual Report on... year in which exports or imports of a Schedule 3 chemical by a plant site, trading company, or...

  2. 15 CFR Supplement No. 2 to Part 713 - Deadlines for Submission of Schedule 2 Declarations, Reports, and Amendments

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical... exports or imports of a Schedule 2 chemical by a plant site, trading company, or other person subject...

  3. A scheduling model for astronomy

    NASA Astrophysics Data System (ADS)

    Solar, M.; Michelon, P.; Avarias, J.; Garces, M.

    2016-04-01

    Astronomical scheduling problem has several external conditions that change dynamically at any time during observations, like weather condition (humidity, temperature, wind speed, opacity, etc.), and target visibility conditions (target over the horizon, Sun/Moon blocking the target). Therefore, a dynamic re-scheduling is needed. An astronomical project will be scheduled as one or more Scheduling Blocks (SBs) as an atomic unit of astronomical observations. We propose a mixed integer linear programming (MILP) solution to select the best SBs, favors SBs with high scientific values, and thus maximizing the quantity of completed observation projects. The data content of Atacama Large Millimeter/Submillimeter Array (ALMA) projects of cycle 0 and cycle 1 were analyzed, and a synthetic set of tests of the real instances was created. Two configurations, one of 5000 SBs in a 3 months season and another 10,000 SBs a 6 months season were created. These instances were evaluated with excellent results. Through the testing it is showed that the MILP proposal has optimal solutions.

  4. Middle School Organization and Scheduling.

    ERIC Educational Resources Information Center

    McGinley, Nancy J.

    The major purpose of this report is to present information about the organization of middle schools in the school district of Philadelphia. The report includes: (1) summary information on rostering/scheduling practices; and (2) comparisons of promotion/retention rates, average daily attendance, and suspension rates in middle schools with different…

  5. Flexible Schedules and Shift Work.

    ERIC Educational Resources Information Center

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  6. Flexible shift scheduling of physicians.

    PubMed

    Brunner, Jens O; Bard, Jonathan F; Kolisch, Rainer

    2009-09-01

    This research addresses a shift scheduling problem in which physicians at a German university hospital are assigned to demand periods over a planning horizon that can extend up to several weeks. When performing the scheduling it is necessary to take into account a variety of legal and institutional constraints that are imposed by a national labor agreement, which governs all physicians in German university hospitals. Currently, most medical departments develop their staff schedules manually at great cost and time. To solve the problem, a new modeling approach is developed that requires shifts to be generated implicitly. Rather than beginning with a predetermined number of shift types and start times, shifts are allowed to start at every pre-defined period in the planning horizon and extend up to 13 h with an hour-long break included. The objective is to find an assignment such that the total hours that have to be paid out as overtime are minimal under the restrictions given by the labor agreement. The problem is formulated as a mixed-integer program and solved with CPLEX. During the solution process individual lines-of-work are constructed for each physician. Using data from an anesthesia department, computational results indicate that high quality schedules can be obtained much more quickly than by current practice. PMID:19739361

  7. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1996-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the US Department of Energy (DOE). This document contains the planned 1996 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project.

  8. Use of Developmental Milestones in Pediatric Residency Training and Practice: Time to Rethink the Meaning of the Mean

    PubMed Central

    Sices, Laura

    2009-01-01

    Objective Pediatricians frequently report the use of developmental milestones in monitoring young children’s development, despite evidence that use of screening tools improves detection of developmental delays. Methods Core texts in the field of pediatrics and developmental-behavioral pediatrics were reviewed for content and presentation on child development. Most texts included and many focused on developmental milestones, many with an emphasis on 50th percentile milestone data. Problems and limitations in the use of 50th percentile milestones to monitor young children’s development and to identify children whose development is suspicious for delay, include questionable utility in clinical decision making and the potential to increase parental anxiety. Results The recommendation is made to reconsider a focus on 50th percentile milestone data in pediatric training and practice, in favor of measures that have better clinical utility and are more psychometrically sound. Conclusion A conceptual approach to the presentation of developmental milestones differentiates the use of the 10th, 50th, and 90th percentiles of age of achievement of skills, based on the clinical purpose of surveillance. PMID:17353732

  9. Development of Watch Schedule Using Rules Approach

    NASA Astrophysics Data System (ADS)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  10. User requirements for a patient scheduling system

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.

    1979-01-01

    A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

  11. Developmental Milestones

    MedlinePlus

    ... think there’s a problem. Watch the video » Child Development: It’s Better to Know (in Spanish) Learn why ... to do if you have concerns about your child's development. Watch this Spanish language video » Related Pages ...

  12. GME Milestone.

    PubMed

    Sorrel, Amy Lynn

    2016-01-01

    Thanks to years of TMA advocacy, the 2015 legislature more than tripled 2013 graduate medical education monies under an expansion initiative to help secure a pathway for doctors-in-training to enter the workforce. PMID:27532810

  13. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  14. The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

    SciTech Connect

    Lavender, John C.; Edwards, W. Scott; Macbeth, Paul J.; Self, Richard J.; West, Lori D.

    2012-07-01

    The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

  15. Adaptive Parallel Job Scheduling with Flexible CoScheduling

    SciTech Connect

    Frachtenberg, Eitan; Feitelson, Dror; Petrini, Fabrizio; Fernandez, Juan

    2005-11-01

    Abstract—Many scientific and high-performance computing applications consist of multiple processes running on different processors that communicate frequently. Because of their synchronization needs, these applications can suffer severe performance penalties if their processes are not all coscheduled to run together. Two common approaches to coscheduling jobs are batch scheduling, wherein nodes are dedicated for the duration of the run, and gang scheduling, wherein time slicing is coordinated across processors. Both work well when jobs are load-balanced and make use of the entire parallel machine. However, these conditions are rarely met and most realistic workloads consequently suffer from both internal and external fragmentation, in which resources and processors are left idle because jobs cannot be packed with perfect efficiency. This situation leads to reduced utilization and suboptimal performance. Flexible CoScheduling (FCS) addresses this problem by monitoring each job’s computation granularity and communication pattern and scheduling jobs based on their synchronization and load-balancing requirements. In particular, jobs that do not require stringent synchronization are identified, and are not coscheduled; instead, these processes are used to reduce fragmentation. FCS has been fully implemented on top of the STORM resource manager on a 256-processor Alpha cluster and compared to batch, gang, and implicit coscheduling algorithms. This paper describes in detail the implementation of FCS and its performance evaluation with a variety of workloads, including large-scale benchmarks, scientific applications, and dynamic workloads. The experimental results show that FCS saturates at higher loads than other algorithms (up to 54 percent higher in some cases), and displays lower response times and slowdown than the other algorithms in nearly all scenarios.

  16. An Adaptive Multi-agent System for Project Schedule Management

    NASA Astrophysics Data System (ADS)

    Shou, Yongyi; Lai, Changtao

    A multi-agent system is established for project schedule management, considering the need for adaptive and dynamic scheduling under uncertainty. The system is realized using Java. In the proposed system, three types of agents, namely activity agents, resource agents, and a monitoring agent, are designed. Duration and resource requirement self-learning operators are developed for activity agents in order to model the self-learning and adaptive capacities of an agent in its local environment; moreover, a monitoring operator is also presented for the monitoring agent. The system allows the user to set up simulation parameters or scheduling rules according to their own preferences. Simulation results from an example showed that the system is effective in supporting users' decision-making process.

  17. Integrating protocol schedules with patients' personal calendars.

    PubMed

    Civan, Andrea; Gennari, John H; Pratt, Wanda

    2006-01-01

    We propose a new approach for integrating protocol care schedules into patients' personal calendars. This approach could provide patients with greater control over their current and future scheduling demands as they seek and receive protocol-based care. PMID:17238511

  18. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps:...

  19. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps:...

  20. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps:...