The prediction of engineering cost for green buildings based on information entropy
NASA Astrophysics Data System (ADS)
Liang, Guoqiang; Huang, Jinglian
2018-03-01
Green building is the developing trend in the world building industry. Additionally, construction costs are an essential consideration in building constructions. Therefore, it is necessary to investigate the problems of cost prediction in green building. On the basis of analyzing the cost of green building, this paper proposes the forecasting method of actual cost in green building based on information entropy and provides the forecasting working procedure. Using the probability density obtained from statistical data, such as labor costs, material costs, machinery costs, administration costs, profits, risk costs a unit project quotation and etc., situations can be predicted which lead to cost variations between budgeted cost and actual cost in constructions, through estimating the information entropy of budgeted cost and actual cost. The research results of this article have a practical significance in cost control of green building. Additionally, the method proposed in this article can be generalized and applied to a variety of other aspects in building management.
Specifications for the First CSP Building System.
ERIC Educational Resources Information Center
Detroit Public Schools, MI.
The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate…
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project. PMID:26339227
Shin, Yoonseok
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.
User costs as one of main advantages of precast concrete application in highway construction
NASA Astrophysics Data System (ADS)
Tomek, Radan
2017-09-01
Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.
Sedimentation and the Economics of Selecting an Optimum Reservoir Size
NASA Astrophysics Data System (ADS)
Miltz, David; White, David C.
1987-08-01
This paper attempts to develop an easily reproducible methodology for the economic selection of an optimal reservoir size given an annual sedimentation rate. The optimal capacity is that at which the marginal cost of constructing additional storage capacity is equal to the dredging costs avoided by having that additional capacity available to store sediment. The cost implications of misestimating dredging costs, construction costs, and sediment delivery rates are investigated. In general, it is shown that oversizing is a rational response to uncertainty in the estimation of parameters. The sensitivity of the results to alternative discount rates is also discussed. The theoretical discussion is illustrated with a case study drawn from Highland Silver Lake in southwestern Illinois.
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO₂ emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO₂ emissions of input materials for each structural frame type. In addition, the CO₂ emissions cost was measured using the trading price of CO₂ emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO₂ emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO₂ emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future.
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
Kim, Sangyong; Moon, Joon-Ho; Shin, Yoonseok; Kim, Gwang-Hee; Seo, Deok-Seok
2013-01-01
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO2 emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of total building construction costs. In this research, four constructed buildings were analyzed, with these having either reinforced concrete (RC) or steel (S) structures. An input-output framework analysis was used to measure energy consumption and CO2 emissions of input materials for each structural frame type. In addition, the CO2 emissions cost was measured using the trading price of CO2 emissions on the International Commodity Exchange. This research revealed that both energy consumption and CO2 emissions were, on average, 26% lower with the RC structure than with the S structure, and the construction costs (including the CO2 emissions cost) of the RC structure were about 9.8% lower, compared to the S structure. This research provides insights through which the construction industry will be able to respond to the carbon market, which is expected to continue to grow in the future. PMID:24227998
Analysis of the Use of Frame Construction and Modular Additions in City Centre
NASA Astrophysics Data System (ADS)
Milwicz, Roman; Milwicz, Natalia; Dubas, Sebastian
2017-10-01
The living urban fabric can be characterized by the continuous introduction of changes and additions. The city centre is subject to specific restrictions due to the conservation protection and high demand on aesthetics aspect, thermal insulation, construction cost and the ratio of usable area of the building area. This article presents a comparative analysis of traditional construction with light frame and modular construction for the above-mentioned issues. Timber frame structure technology was suggested as effective, economic and innovative solutions for modular additions on buildings in city centres.
2014-11-01
thus increasing the likelihood of additional testing delays. For example, testing of the ship’s fire sprinklers was delayed because construction of...not deploy as scheduled or will deploy without fully tested systems . The Navy is implementing steps to achieve the $11.5 billion congressional cost...cap, by postponing installation of some systems until after ship delivery, and deferring an estimated $200 million - $250 million in previously
Belowground advantages in construction cost facilitate a cryptic plant invasion
Caplan, Joshua S.; Wheaton, Christine N.; Mozdzer, Thomas J.
2014-01-01
The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. PMID:24938305
Construction of road network vulnerability evaluation index based on general travel cost
NASA Astrophysics Data System (ADS)
Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin
2018-03-01
With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.
Formation of costs of high-rise objects of housing and civil purpose based on enlarged norms
NASA Astrophysics Data System (ADS)
Vorotyntseva, Anna; Ovsiannikov, Andrei; Bolgov, Vladimir
2018-03-01
When determining the cost of capital construction objects, for purposes of pre-design workings out and purposes of initial maximum initial price determination on tenders, construction price norms are used (CPNs). Modern CPNs are not designed to determine the value of high-rise buildings. It is necessary to adapt modern CPNs to get opportunity for the possibility to take into account special cost factors in determining the cost of high-rise buildings. The main ways can be: selection of new representative objects or application of additional correction factors.
40 CFR 35.918-1 - Additional limitations on awards for individual systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... before that date; (b) Demonstrate in the facility plan that the solution chosen is cost-effective and selected in accordance with the cost-effectiveness guidelines for the construction grants program (see... underground potable water sources; (g) Establish a system of user charges and industrial cost recovery in...
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. This research project addressed the following questions: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences?more » 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost?« less
Improving the accuracy of camber predictions for precast pretensioned concrete beams.
DOT National Transportation Integrated Search
2015-07-01
The discrepancies between the designed and measured camber of precast pretensioned concrete beams (PPCBs) observed by the : Iowa DOT have created challenges in the field during bridge construction, causing construction delays and additional costs. Th...
48 CFR 49.305-2 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 49.305-2 Section 49.305-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for...
NASA Astrophysics Data System (ADS)
Chowdhury, Md Mukul
With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.
Game Theory Analysis of Bidding for A Construction Contract
NASA Astrophysics Data System (ADS)
Kembłowski, Marian W.; Grzyl, Beata; Siemaszko, Agata
2017-10-01
The authors are concerned with a bidding problem. There are two companies (P1 and P2) bidding for a highway construction project. In order to be more competitive, P1 considers buying a new gravel pit near the construction site. The basic cost of the pit is known to both companies. However, there is also an additional, hidden, cost (C) known only to P1. P2 is uncertain whether the hidden cost is C = 0 or C = x. P1 plans to bid for the job, but has to decide whether to buy the gravel pit. P2, not having a complete knowledge about C, thus not knowing the strategy choice of P1, has to decide if to bid for the job. In effect we have two payoff matrices, one for the additional cost C = 0, and the other one for C = x. If the probability of P2 bidding for the project can be estimated by propagating intelligence information through a Bayesian Belief Network, the best strategy for P1 can be readily determined. Otherwise, the solution calls for changing this game of incomplete information (players may or may not know some information about the other players, e.g., their “type,” their strategies, payoffs) into a game of imperfect information (players are simply unaware of the actions chosen by other players). This is achieved by introducing an additional “Nature” node which for this problem determines with some probability “p” the additional cost C= 0 (thus, C = x with probability 1-p). The solution of this game turns out to depend on the probability “p”. For some values of p the game is solved with pure strategies, whereas for other values the game is in equilibrium when the players randomly mix their strategies.
Automated Reuse of Scientific Subroutine Libraries through Deductive Synthesis
NASA Technical Reports Server (NTRS)
Lowry, Michael R.; Pressburger, Thomas; VanBaalen, Jeffrey; Roach, Steven
1997-01-01
Systematic software construction offers the potential of elevating software engineering from an art-form to an engineering discipline. The desired result is more predictable software development leading to better quality and more maintainable software. However, the overhead costs associated with the formalisms, mathematics, and methods of systematic software construction have largely precluded their adoption in real-world software development. In fact, many mainstream software development organizations, such as Microsoft, still maintain a predominantly oral culture for software development projects; which is far removed from a formalism-based culture for software development. An exception is the limited domain of safety-critical software, where the high-assuiance inherent in systematic software construction justifies the additional cost. We believe that systematic software construction will only be adopted by mainstream software development organization when the overhead costs have been greatly reduced. Two approaches to cost mitigation are reuse (amortizing costs over many applications) and automation. For the last four years, NASA Ames has funded the Amphion project, whose objective is to automate software reuse through techniques from systematic software construction. In particular, deductive program synthesis (i.e., program extraction from proofs) is used to derive a composition of software components (e.g., subroutines) that correctly implements a specification. The construction of reuse libraries of software components is the standard software engineering solution for improving software development productivity and quality.
Fine-grain concrete from mining waste for monolithic construction
NASA Astrophysics Data System (ADS)
Lesovik, R. V.; Ageeva, M. S.; Lesovik, G. A.; Sopin, D. M.; Kazlitina, O. V.; Mitrokhin, A. A.
2018-03-01
The technology of a monolithic construction is a well-established practice among most Russian real estate developers. The strong points of the technology are low cost of materials and lower demand for qualified workers. The monolithic construction uses various types of reinforced slabs and foamed concrete, since they are easy to use and highly durable; they also need practically no additional treatment.
DOT National Transportation Integrated Search
2004-11-01
The purpose of this research is to assess the cost effectiveness of purchasing additional limited access right-of-way at the time of construction in lieu of retrofitting interchange areas after functional failure. The findings indicate that the long ...
NASA Astrophysics Data System (ADS)
Katsura, Yasufumi; Attaviriyanupap, Pathom; Kataoka, Yoshihiko
In this research, the fundamental premises for deregulation of the electric power industry are reevaluated. The authors develop a simple model to represent wholesale electricity market with highly congested network. The model is developed by simplifying the power system and market in New York ISO based on available data of New York ISO in 2004 with some estimation. Based on the developed model and construction cost data from the past, the economic impact of transmission line addition on market participants and the impact of deregulation on power plant additions under market with transmission congestion are studied. Simulation results show that the market signals may fail to facilitate proper capacity additions and results in the undesirable over-construction and insufficient-construction cycle of capacity addition.
32 CFR 644.47 - Appraisal of other interests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... improvements will include, in addition to complete coverage of all factors influencing the use of the property... construction. (ii) Complete cost data as to original purchase price and Government construction. (iii) Detailed... inspected, it will be so noted in the appraisal report. The decision concerning the necessity for a physical...
Code of Federal Regulations, 2011 CFR
2011-01-01
... OA. Customer agencies are also financially responsible for revised design costs and any additional costs resulting from changes to space requirements or space layouts made by the agency after a lease, alteration, design, or construction contract has been awarded by GSA. ...
Code of Federal Regulations, 2012 CFR
2012-01-01
... OA. Customer agencies are also financially responsible for revised design costs and any additional costs resulting from changes to space requirements or space layouts made by the agency after a lease, alteration, design, or construction contract has been awarded by GSA. ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OA. Customer agencies are also financially responsible for revised design costs and any additional costs resulting from changes to space requirements or space layouts made by the agency after a lease, alteration, design, or construction contract has been awarded by GSA. ...
Code of Federal Regulations, 2014 CFR
2014-01-01
... OA. Customer agencies are also financially responsible for revised design costs and any additional costs resulting from changes to space requirements or space layouts made by the agency after a lease, alteration, design, or construction contract has been awarded by GSA. ...
Code of Federal Regulations, 2013 CFR
2013-07-01
... OA. Customer agencies are also financially responsible for revised design costs and any additional costs resulting from changes to space requirements or space layouts made by the agency after a lease, alteration, design, or construction contract has been awarded by GSA. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rawls, G.
ASME is evaluating the use of additive manufacturing (AM) for the construction of pressure equipment. The information in this report assesses available AM technologies for direct metal fabrication of pressure equipment. Background information is included in the report to provide context for those not experienced in AM technology. Only commercially available technologies for direct metal fabrication are addressed in the report because these AM methods are the only viable approaches for the construction of pressure equipment. Metal AM technologies can produce near-net shape parts by using multiple layers of material from a three dimensional (3D) design model of the geometry.more » Additive manufacturing of metal components was developed from polymer based rapid prototyping or 3D printing. At the current maturity level, AM application for pressure equipment has the potential to reduce delivery times and costs for complex shapes. AM will also lead to a reduction in the use of high cost materials, since parts can be created with corrosion resistant layers of high alloy material and structural layers of lower cost materials.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Townsend, M.W.
The Monsanto Chemical Company operates a plastics and resins plant located in Addyston, Ohio. The process equipment requires routine rinsing with technical grade acetone between batches. Due to the volumes of spent acetone generated and the associated RCRA hazardous waste regulations, the plant sought to recycle and reuse the acetone to reduce the purchase cost of virgin acetone and the cost of spent acetone disposal. One of the first options explored was package unit distillation units. The cost of these units was in the $20--$30,000 range in 1989 dollars. Even though the cost of a package unit was not deemedmore » unreasonable, there were additional costs and concerns that led to elimination of this option. The unit would have required additional manpower to operate and maintain, i.e., at least a fraction of an operator and mechanic. For plant safety reasons, it was desired to operate this package unit outside the production building, thus construction of an outbuilding would have added to the expense of the project. Additionally, there were concerns of package unit reliability. During this evaluation, tractor-trailer mounted distillation units were discovered. The portable units were equipped with either thin-film evaporator technology capable of processing 240 to 480 gallons per hour, or pot still (batch) distillation technology capable of rates from 120 to 240 gallons per hour. Both units were constructed of stainless steel.« less
NASA Astrophysics Data System (ADS)
Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid
2017-10-01
One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiNunzio, Camillo A.; Gupta, Abhinav; Golay, Michael
2002-11-30
This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.
Fitness costs associated with building and maintaining the burying beetle's carrion nest.
De Gasperin, Ornela; Duarte, Ana; Troscianko, Jolyon; Kilner, Rebecca M
2016-10-13
It is well-known that features of animal nest architecture can be explained by fitness benefits gained by the offspring housed within. Here we focus on the little-tested suggestion that the fitness costs associated with building and maintaining a nest should additionally account for aspects of its architecture. Burying beetles prepare an edible nest for their young from a small vertebrate carcass, by ripping off any fur or feathers and rolling the flesh into a rounded ball. We found evidence that only larger beetles are able to construct rounder carcass nests, and that rounder carcass nests are associated with lower maintenance costs. Offspring success, however, was not explained by nest roundness. Our experiment thus provides rare support for the suggestion that construction and maintenance costs are key to understanding animal architecture.
Fitness costs associated with building and maintaining the burying beetle’s carrion nest
De Gasperin, Ornela; Duarte, Ana; Troscianko, Jolyon; Kilner, Rebecca M.
2016-01-01
It is well-known that features of animal nest architecture can be explained by fitness benefits gained by the offspring housed within. Here we focus on the little-tested suggestion that the fitness costs associated with building and maintaining a nest should additionally account for aspects of its architecture. Burying beetles prepare an edible nest for their young from a small vertebrate carcass, by ripping off any fur or feathers and rolling the flesh into a rounded ball. We found evidence that only larger beetles are able to construct rounder carcass nests, and that rounder carcass nests are associated with lower maintenance costs. Offspring success, however, was not explained by nest roundness. Our experiment thus provides rare support for the suggestion that construction and maintenance costs are key to understanding animal architecture. PMID:27734965
The costs of housing developments on sites with elevated landslide risk in the UK
NASA Astrophysics Data System (ADS)
Barclay, K.; Heath, A.
2015-09-01
New housing targets are being set for local planning authorities resulting in more areas being zoned for development. There is currently no requirement for a landslide assessment prior to this zoning, and sites at elevated risk of landslides are being put forward for development without consideration of the additional costs and other impacts of building on these higher risk sites. This study aimed to reveal the increased financial, economic, social and environmental costs associated with these decisions. Case studies were focused on the city of Bath, an area of increasing population and “one of the most intensely landslipped areas in Britain’’. The case studies found the financial costs associated with building in a landslide risk area to be significantly higher than the equivalent construction in areas of greater geological stability. Furthermore, it was found that uncertainty in cost when developing in unstable areas exacerbates this problem as the final cost cannot be accurately predicted before construction.
Advanced Energy Efficient Roof System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jane Davidson
2008-09-30
Energy consumption in buildings represents 40 percent of primary U.S. energy consumption, split almost equally between residential (22%) and commercial (18%) buildings.1 Space heating (31%) and cooling (12%) account for approximately 9 quadrillion Btu. Improvements in the building envelope can have a significant impact on reducing energy consumption. Thermal losses (or gains) from the roof make up 14 percent of the building component energy load. Infiltration through the building envelope, including the roof, accounts for an additional 28 percent of the heating loads and 16 percent of the cooling loads. These figures provide a strong incentive to develop and implementmore » more energy efficient roof systems. The roof is perhaps the most challenging component of the building envelope to change for many reasons. The engineered roof truss, which has been around since 1956, is relatively low cost and is the industry standard. The roof has multiple functions. A typical wood frame home lasts a long time. Building codes vary across the country. Customer and trade acceptance of new building products and materials may impede market penetration. The energy savings of a new roof system must be balanced with other requirements such as first and life-cycle costs, durability, appearance, and ease of construction. Conventional residential roof construction utilizes closely spaced roof trusses supporting a layer of sheathing and roofing materials. Gypsum board is typically attached to the lower chord of the trusses forming the finished ceiling for the occupied space. Often in warmer climates, the HVAC system and ducts are placed in the unconditioned and otherwise unusable attic. High temperature differentials and leaky ducts result in thermal losses. Penetrations through the ceilings are notoriously difficult to seal and lead to moisture and air infiltration. These issues all contribute to greater energy use and have led builders to consider construction of a conditioned attic. The options considered to date are not ideal. One approach is to insulate between the trusses at the roof plane. The construction process is time consuming and costs more than conventional attic construction. Moreover, the problems of air infiltration and thermal bridges across the insulation remain. Another approach is to use structurally insulated panels (SIPs), but conventional SIPs are unlikely to be the ultimate solution because an additional underlying support structure is required except for short spans. In addition, wood spline and metal locking joints can result in thermal bridges and gaps in the foam. This study undertook a more innovative approach to roof construction. The goal was to design and evaluate a modular energy efficient panelized roof system with the following attributes: (1) a conditioned and clear attic space for HVAC equipment and additional finished area in the attic; (2) manufactured panels that provide structure, insulation, and accommodate a variety of roofing materials; (3) panels that require support only at the ends; (4) optimal energy performance by minimizing thermal bridging and air infiltration; (5) minimal risk of moisture problems; (6) minimum 50-year life; (7) applicable to a range of house styles, climates and conditions; (8) easy erection in the field; (9) the option to incorporate factory-installed solar systems into the panel; and (10) lowest possible cost. A nationwide market study shows there is a defined market opportunity for such a panelized roof system with production and semi-custom builders in the United States. Senior personnel at top builders expressed interest in the performance attributes and indicate long-term opportunity exists if the system can deliver a clear value proposition. Specifically, builders are interested in (1) reducing construction cycle time (cost) and (2) offering increased energy efficiency to the homebuyer. Additional living space under the roof panels is another low-cost asset identified as part of the study. The market potential is enhanced through construction activity levels in target markets. Southern markets, from Florida to Texas account for 50 percent of the total new construction angled-roof volume. California contributes an additional 13 percent share of market volume. These states account for 28 to 30 million squares (2.8 to 3 billion square feet) of new construction angled roof opportunity. The major risk to implementation is the uncertainty of incorporating new design and construction elements into the construction process. By coordinating efforts to enhance the drivers for adoption and minimize the barriers, the panelized roof system stands to capitalize on a growing market demand for energy efficient building alternatives and create a compelling case for market adoption.« less
Prototype of a low cost multiparameter probe
NASA Astrophysics Data System (ADS)
Koski, K.; Schwingle, R.; Pullin, M.
2010-12-01
Commercial multi-parameter probes provide accurate, high-resolution temporal data collection of a variety of water quality parameters, but their cost (>5,000) prohibits more than a few sampling locations. We present a design and prototype for a low cost (<250) probe. The cost of the probe is ~5% of commercially available probes, allowing for data collection from ~20 times more sampling points in a field location. The probe is constructed from a single-board microcontroller, a commercially available temperature sensor, a conductivity sensor, and a fabricated optical rhodamine sensor. Using a secure digital (SD) memory card, the probe can record over a month of data at a user specified interval. Construction, calibration, field deployment and data retrieval can be accomplished by a skilled undergraduate. Initial deployment will take place as part of a tracer test in the Valles Caldera National Preserve in northern New Mexico. Future work includes: addition of commercial ion selective electrodes (pH, bromide, nitrate, and others); construction of optically based sensors (chlorophyll, dissolved oxygen, and others); wireless networking between the sensors; and reduction of biofouling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Arizona. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Hawaii. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Connecticut. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Basic materials and structures aspects for hypersonic transport vehicles (HTV)
NASA Astrophysics Data System (ADS)
Steinheil, E.; Uhse, W.
A Mach 5 transport design is used to illustrate structural concepts and criteria for materials selections and also key technologies that must be followed in the areas of computational methods, materials and construction methods. Aside from the primary criteria of low weight, low costs, and conceivable risks, a number of additional requirements must be met, including stiffness and strength, corrosion resistance, durability, and a construction adequate for inspection, maintenance and repair. Current aircraft construction requirements are significantly extended for hypersonic vehicles. Additional consideration is given to long-duration temperature resistance of the airframe structure, the integration of large-volume cryogenic fuel tanks, computational tools, structural design, polymer matrix composites, and advanced manufacturing technologies.
Industrial waste utilization in the panels production for high buildings facade and socle facing
NASA Astrophysics Data System (ADS)
Vitkalova, Irina; Torlova, Anastasiya; Pikalov, Evgeniy; Selivanov, Oleg
2018-03-01
The research presents comprehensive utilization of such industrial waste as galvanic sludge, broken window glass as functional additives for producing ceramics for facade and socle paneling in high-rise construction. The basic charge component is low-plasticity clay, which does not allow producing high-quality products if used without any functional additives. The application of the mentioned above components broadens the resource base, reduces production cost and the mass of the products in comparison with the currently used facing ceramics. The decrease of product mass helps to reduce the load on the basement and to use ceramic material in high-rise construction more effectively. Additional advantage of the developed composition is the reducing of production energy intensity due to comparatively low pressing pressure and firing temperature thus reducing the overall production cost. The research demonstrates the experimental results of determining density, compressive strength, water absorption, porosity and frost resistance of the produced ceramic material. These characteristics prove that the material can be applied for high buildings outdoor paneling. Additional research results prove ecologic safety of the produced ceramic material.
Patient expectations and costs of immediate reporting of screening mammography: talk isn't cheap.
Raza, S; Rosen, M P; Chorny, K; Mehta, T S; Hulka, C A; Baum, J K
2001-09-01
Our purpose was to determine whether patients prefer immediate or delayed results of screening mammography and to determine the cost of immediate reporting at our institution. A survey was anonymously and randomly distributed to 129 women who were 35-70 years old during a visit to their primary care physician, asking the women's preference for receiving mammography results by one of two systems: by letter with a return visit for any additional tests; or by speaking at once with the radiologist, with the option of additional tests being performed during the same visit. Patients' willingness to pay for the latter service was also determined. A cost identification model was constructed using commercially available software. We considered the impact on radiologists' and technologists' time and the need for additional equipment and space, and we analyzed the effect on the cost of immediate reporting. One hundred twenty (93%) surveys were completed. Eighty women (67%) preferred immediate reporting, and 62 (78%) of these 80 patients would wait 30-60 min. The additional cost of immediate reporting is $28.22 per patient. Only 11% of patients were willing to pay this additional cost. When new equipment and space were not required, the cost would increase by $4.38. This cost was most influenced by the time required to give patients normal results. Most surveyed patients preferred speaking with a radiologist immediately but were unwilling to pay additional fees. Radiologists, hospital administrators, and health care planners must be aware of the costs of immediate reporting and must factor these costs into any change in hospital or national policy.
NASA Astrophysics Data System (ADS)
Asaine, Keita; Asaine, Wataru; Shiratsuchi, Ryoma; Yoshida, Takaichi; Hashimoto, Masaaki
This paper highlights the issues of procurement management in construction projects, such as late delivery of purchased equipments/materials and missing instructions from customers, which cause delays of construction schedule and over-budget cost. We point that most of these problems are caused by lack of synchronization between procurement activities and process control. Therefore, we propose a managerial method which enables better synchronization between the two by applying this method to a construction company. We discuss the necessary conditions and validity of incorporating it and show the way how to establish the mechanics through the case study. Furthermore, we analyze that the feature of this method is not only addressing procurement issues but also bringing additional benefits, such as shortening project lead time and reducing project cost.
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
25 CFR 700.467 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
Historic Context and Management Plan for the Quarry Pond Archeological Complex on Fort Drum
2012-04-01
owner at that time). The purchase of the entire village and 4,500 acres of adjoining land cost Sterling $10,000; the purchase was made in partnership...roads, all at a cost of $13,000. Additionally, the company provided land for the construction of a Catholic Church, possibly for the Irish laborers that...site for limestone, as the raw stone required significant cost and effort to move any distance. The burnt lime was much reduced in bulk from the
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Texas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Texas. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Minnesota. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Indiana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Indiana. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Florida. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Maine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Maine. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Vermont
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Vermont. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Michigan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Michigan. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Alabama
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Alabama. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of New Hampshire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of New Hampshire. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of New Mexico. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Colorado. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Washington
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Washington. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Montana. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the District of Columbia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the District of Columbia. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Massachusetts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Massachusetts. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Oregon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Oregon. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Wisconsin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Wisconsin. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Ohio
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Ohio. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of South Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of South Carolina. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of North Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of North Carolina. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology usedmore » in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Iowa
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Philip R.; Athalye, Rahul A.; Xie, YuLong
2015-12-01
Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Iowa. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used inmore » the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.« less
Naing, Cho; Poovorawan, Yong; Mak, Joon Wah; Aung, Kyan; Kamolratankul, Pirom
2015-06-01
The present study aimed to assess the cost-utility analysis of using an adjunctive recombinant activated factor VIIa (rFVIIa) in children for controlling life-threatening bleeding in dengue haemorrhagic fever (DHF)/dengue shock syndrome (DSS). We constructed a decision-tree model, comparing a standard care and the use of an additional adjuvant rFVIIa for controlling life-threatening bleeding in children with DHF/DSS. Cost and utility benefit were estimated from the societal perspective. The outcome measure was cost per quality-adjusted life years (QALYs). Overall, treatment with adjuvant rFVIIa gained QALYs, but the total cost was higher. The incremental cost-utility ratio for the introduction of adjuvant rFVIIa was $4241.27 per additional QALY. Sensitivity analyses showed the utility value assigned for calculation of QALY was the most sensitive parameter. We concluded that despite high cost, there is a role for rFVIIa in the treatment of life-threatening bleeding in patients with DHF/DSS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Building Science Corporation (BSC) worked directly with the David Weekley Homes - Houston division to develop a cost-effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses in preparation for the upcoming code changes in 2015. The following research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story singlemore » family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
Dielectric properties of 3D-printed materials for anatomy specific 3D-printed MRI coils
NASA Astrophysics Data System (ADS)
Behzadnezhad, Bahareh; Collick, Bruce D.; Behdad, Nader; McMillan, Alan B.
2018-04-01
Additive manufacturing provides a low-cost and rapid means to translate 3D designs into the construction of a prototype. For MRI, this type of manufacturing can be used to construct various components including the structure of RF coils. In this paper, we characterize the material properties (dielectric constant and loss tangent) of several common 3D-printed polymers in the MRI frequency range of 63-300 MHz (for MRI magnetic field strengths of 1.5-7 T), and utilize these material properties in full-wave electromagnetic simulations to design and construct a very low-cost subject/anatomy-specific 3D-printed receive-only RF coil that fits close to the body. We show that the anatomy-specific coil exhibits higher signal-to-noise ratio compared to a conventional flat surface coil.
Comparison of Navy and Private-Sector Construction Costs
1997-09-01
contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar
Research notes : recycled plastics in highway construction and maintenance.
DOT National Transportation Integrated Search
1994-04-01
The Oregon public and Oregon Legislature have great interests in the use of recycled waste products. The costs of waste disposal continue to increase as existing landfills approach maximum capacity forcing development of additional landfills. In resp...
Patriot Advanced Capability-3 Missile Segment Enhancement (PAC-3 MSE)
2015-12-01
Threshold Demonstrated Performance Current Estimate System Training Proficiency Level Soldiers (Operators, Maintainers, and Leaders) are able to...constructive training environments by using TADSS to conduct multi- level training for both operators and maintenance personnel. With the addition...0.0 Total 6037.0 6037.0 N/A 6276.9 6722.3 6722.3 6900.3 Current APB Cost Estimate Reference Army Cost Position dated February 28, 2014 Confidence Level
Evaluating the Tradeoffs Between Dollars Spent and Lives saved in Military Settings
2013-11-18
data needed , and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this...Programs that improve workplace safety have costs. Firms may need to purchase additional equipment or protective devices, install machine guards...employers the costs may be slight. Because of the inherent dangers in production, firms in mining, logging, fishing, and construction will need to
How do we evaluate the cost of healthcare technology?
NASA Astrophysics Data System (ADS)
Nobel, Joel J.
1994-12-01
Five critical questions apply when evaluating the cost of healthcare technology: Who is asking the question (of how to evaluate healthcare costs)? For what purpose? What is the nature of the decision that must be made? At what state of a technology's development and diffusion are the questions being posed? What type of technology is stimulating the questions? A large number of organizations, both national and international, are engaged in technology assessment, and constructive disagreement improves the overall quality of those assessments. Current cost measurements tools such as cost-utility analysis, cost-benefit analysis, cost- effectiveness analysis, and outcomes research are weak and ineffective. Recently, pharmaceutical manufacturers have adopted more global cost-effectiveness studies. Technology assessments will ultimately focus on examining the relative cost-effectiveness of alternative technologies for a specific pathology or examining the relative cost-effectiveness of alternative technologies for a specific pathology or DRG. In addition to the traditional healthcare facility--hospital, outpatient facility, or group practice, group purchasing organizations are also asking about cost-effectiveness of healthcare. ECRI's SELECTTM process, unlike less effective technology assessments, takes into account real-world user experience data and life-cycle cost analysis in addition to detailed comparisons of technical features and performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, K.; Paramonov, D.
2002-07-01
IRIS (International Reactor Innovative and Secure) is a small to medium advanced light water cooled modular reactor being developed by an international consortium led by Westinghouse/BNFL. This reactor design is specifically aimed at utilities looking to install new (or replacement) nuclear capacity to match market demands, or at developing countries for their distributed power needs. To determine the optimal configuration for IRIS, analysis was undertaken to establish Generation Costs ($/MWh) and Internal Rate of Return (IRR %) to the Utility at alternative power ratings. This was then combined with global market projections for electricity demand out to 2030, segmented intomore » key geographical regions. Finally this information is brought together to form insights, conclusions and recommendations regarding the optimal design. The resultant analysis reveals a single module sized at 335 MWe, with a construction period of 3 years and a 60-year plant life. Individual modules can be installed in a staggered fashion (3 equivalent to 1005 MWe) or built in pairs (2 sets of twin units' equivalent to 1340 MWe). Uncertainty in Market Clearing Price for electricity, Annual Operating Costs and Construction Costs primarily influence lifetime Net Present Values (NPV) and hence IRR % for Utilities. Generation Costs in addition are also influenced by Fuel Costs, Plant Output, Plant Availability and Plant Capacity Factor. Therefore for a site based on 3 single modules, located in North America, Generations Costs of 28.5 $/MWh are required to achieve an IRR of 20%, a level which enables IRIS to compete with all other forms of electricity production. Plant size is critical to commercial success. Sustained (lifetime) high factors for Plant Output, Availability and Capacity Factor are required to achieve a competitive advantage. Modularity offers Utilities the option to match their investments with market conditions, adding additional capacity as and when the circumstances are right. Construction schedule needs to be controlled. There is a clear trade-off between reducing financing charges and optimising revenue streams. (authors)« less
Chou, I.-Ming; Rostam-Abadi, M.; Lytle, J.M.; Achorn, F.P.
1996-01-01
Costs for constructing and operating a conceptual plant based on a proposed process that converts flue gas desulfurization (FGD)-gypsum to ammonium sulfate fertilizer has been calculated and used to estimate a market price for the product. The average market price of granular ammonium sulfate ($138/ton) exceeds the rough estimated cost of ammonium sulfate from the proposed process ($111/ ton), by 25 percent, if granular size ammonium sulfate crystals of 1.2 to 3.3 millimeters in diameters can be produced by the proposed process. However, there was at least ??30% margin in the cost estimate calculations. The additional costs for compaction, if needed to create granules of the required size, would make the process uneconomical unless considerable efficiency gains are achieved to balance the additional costs. This study suggests the need both to refine the crystallization process and to find potential markets for the calcium carbonate produced by the process.
NASA Technical Reports Server (NTRS)
1978-01-01
The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.
Cost-effectiveness of 13-valent pneumococcal conjugate vaccine in Switzerland.
Blank, Patricia R; Szucs, Thomas D
2012-06-13
The 7-valent pneumococcal conjugate vaccine (PCV7) has been shown to be highly cost-effective. The 13-valent pneumococcal conjugate vaccine (PCV13) offers seroprotection against six additional serotypes. A decision-analytic model was constructed to estimate direct medical costs and clinical effectiveness of PCV13 vaccination on invasive pneumococcal disease (IPD), pneumonia, and otitis media relative to PCV7 vaccination. The option with an one-dose catch-up vaccination in children of 15-59 months was also considered. Assuming 83% vaccination coverage and considering indirect effects, 1808 IPD, 5558 pneumonia and 74,136 otitis media cases could be eliminated from the entire population during a 10-year modelling period. The PCV13 vaccination programme would lead to additional costs (+€26.2 Mio), but saved medical costs of -€77.1 Mio due to cases averted and deaths avoided, overcompensate these costs (total cost savings -€50.9 Mio). The national immunisation programmes with PCV13 can be assumed cost saving when compared with the current vaccine PCV7 in Switzerland. Copyright © 2012 Elsevier Ltd. All rights reserved.
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 367.52 - Overhead construction costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT Service Company Property Instructions § 367.52 Overhead construction costs. (a) All overhead construction costs, such as engineering, supervision, general office salaries and expenses, construction... costs. 367.52 Section 367.52 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
Sculpher, M J; Buxton, M J
1993-11-01
The construction of a composite effectiveness measure was explored using clinical data collected routinely in trials of drug therapies for asthma. The measure is the episode-free day (EFD), where an 'episode' is either an asthma attack, the need for rescue medication, sleep disturbance caused by asthma, or an adverse event. The EFD measure was used in a retrospective cost-effectiveness analysis of a previous Phase III controlled clinical trial of formoterol versus salbutamol, in which 145 patients with bronchial asthma were randomised to receive maintenance therapy with either inhaled formoterol or inhaled salbutamol over a 12-week period. Average and incremental cost-effectiveness ratios were assessed for the 2 drugs in terms of the total expected cost of drug plus rescue therapy, and EFD rates. The analysis suggests that, with relatively little addition to clinical data collection, economically and clinically meaningful composite measures can be constructed to assist in making cost-effectiveness comparisons between alternative asthma therapies.
Satellite solar power - Will it pay off
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1977-01-01
A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.
Solar Power Satellite Concept Evaluation. Volume 1: Summary
NASA Technical Reports Server (NTRS)
1977-01-01
A program was developed to determine the technical feasiblity of a satellite solar power station. The space construction, maintenance, and transport systems are discussed. Environmental factors, in addition to manufacturing, natural resources, and energy were considered. Cost estimates and alternative systems are outlined.
Occupational injury costs and alternative employment in construction trades.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Men, Yurong; Haile, Elizabeth
2007-11-01
To present the costs of fatal and non-fatal days-away-from-work injuries in 50 construction occupations. Our results also provide indirect evidence on the cost exposure of alternative construction workers such as independent contractors, on-call or day labor, contract workers, and temporary workers. We combine data from the Bureau of Labor Statistics on average annual incidence from 2000 to 2002 with updated per-case costs from an existing cost model for occupational injuries. The Current Population Survey provides data on the percentage of alternative construction workers. Construction laborers and carpenters were the two costliest occupations, with 40% of the industry's injury costs. The 10 costliest construction occupations also have a high percentage of alternative workers. The construction industry has both a high rate of alternative employment and high costs of work injury. Alternative workers, often lacking workers' compensation, are especially exposed to injury costs.
2017-03-01
address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing
Code of Federal Regulations, 2013 CFR
2013-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., including architectural and engineering costs, and costs associated with compliance with the National.... Allowable costs means those project costs for which Federal funding may be expended under this part. Only construction and construction-related costs will be allowable. Construction means supervising, inspecting...
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
NASA Technical Reports Server (NTRS)
Ordonez, Erick; Edmunson, Jennifer; Fiske, Michael; Christiansen, Eric; Miller, Josh; Davis, Bruce Alan; Read, Jon; Johnston, Mallory; Fikes, John
2017-01-01
Additive Construction is the process of building infrastructure such as habitats, garages, roads, berms, etcetera layer by layer (3D printing). The National Aeronautics and Space Administration (NASA) and the United States Army Corps of Engineers (USACE) are pursuing additive construction to build structures using resources available in-situ. Using materials available in-situ reduces the cost of planetary missions and operations in theater. The NASA team is investigating multiple binders that can be produced on planetary surfaces, including the magnesium oxide-based Sorel cement; the components required to make Ordinary Portland Cement (OPC), the common cement used on Earth, have been found on Mars. The availability of OPC-based concrete on Earth drove the USACE to pursue additive construction for base housing and barriers for military operations. Planetary and military base structures must be capable of resisting micrometeoroid impacts with velocities ranging from 11 to 72km/s for particle sizes 200 micrometers or more (depending on protection requirements) as well as bullets and shrapnel with a velocity of 1.036km/s with projectiles 5.66mm diameter and 57.40mm in length, respectively.
A study in cost analysis of aggregate production as depending on drilling and blasting design
NASA Astrophysics Data System (ADS)
Bilim, Niyazi; Çelik, Arif; Kekeç, Bilgehan
2017-10-01
Since aggregate production has vital importance for many engineering projects-such as construction, highway and plant-mixed concrete production-this study was undertaken to determine how the costs for such production are affected by the design of drilling and blasting processes used. Aggregates are used in the production of concrete and asphalt, which are critical resources for the construction sector. The ongoing population increase and the growth of living standards around the world drive the increasing demand for these products. As demand grows, competition has naturally arisen among producers in the industry. Competition in the market has directly affected prices, which leads to the need for new measures and cost analysis on production costs. The cost calculation is one of the most important parameters in mining activities. Aggregate production operations include drilling, blasting, secondary crushing (if necessary), loading, hauling and crushing-screening, and each of these factors affects cost. In this study, drilling and blasting design parameters (such as hole diameter, hole depth, hole distance and burden) were investigated and evaluated for their effect on the total cost of quarrying these products, based on a particular quarry selected for this research. As the result of evaluation, the parameters actually driving costs have been identified, and their effects on the cost have been determined. In addition, some suggestions are presented regarding production design which may lead to avoiding increased production costs.
Increasing Coverage of Appropriate Vaccinations
Jacob, Verughese; Chattopadhyay, Sajal K.; Hopkins, David P.; Morgan, Jennifer Murphy; Pitan, Adesola A.; Clymer, John
2016-01-01
Context Population-level coverage for immunization against many vaccine-preventable diseases remains below optimal rates in the U.S. The Community Preventive Services Task Force recently recommended several interventions to increase vaccination coverage based on systematic reviews of the evaluation literature. The present study provides the economic results from those reviews. Evidence acquisition A systematic review was conducted (search period, January 1980 through February 2012) to identify economic evaluations of 12 interventions recommended by the Task Force. Evidence was drawn from included studies; estimates were constructed for the population reach of each strategy, cost of implementation, and cost per additional vaccinated person because of the intervention. Analyses were conducted in 2014. Evidence synthesis Reminder systems, whether for clients or providers, were among the lowest-cost strategies to implement and the most cost effective in terms of additional people vaccinated. Strategies involving home visits and combination strategies in community settings were both costly and less cost effective. Strategies based in settings such as schools and managed care organizations that reached the target population achieved additional vaccinations in the middle range of cost effectiveness. Conclusions The interventions recommended by the Task Force differed in reach, cost, and cost effectiveness. This systematic review presents the economic information for 12 effective strategies to increase vaccination coverage that can guide implementers in their choice of interventions to fit their local needs, available resources, and budget. PMID:26847663
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Development of Economic Factors in Tunnel Construction
DOT National Transportation Integrated Search
1977-12-01
The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...
Costs of occupational injuries in construction in the United States.
Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong
2007-11-01
This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.
A Cost Savings Analysis of the Streamlined Military Construction Program Process
1990-04-16
program through Congressional action . Review of these two years allowed the biennial budget to be addressed from the perspective of the first year of...specifications in outline form. c. Preliminar- project design cost estimates.. d. Back-up daca as required by this Appendix. 2. The 35 percent preliminary...delayed Congressional action . A pragmatic estimate would add an additional 12-36 months to the optimistic total. How can it possibly take that long? In
Costs of Urbanisation in Poland, Based on the Example of Wrocław
NASA Astrophysics Data System (ADS)
Hełdak, Maria; Płuciennik, Monika
2017-10-01
The paper deals with the issue of charging communes with the costs of realisation of the provisions contained in local spatial development plans. When such local spatial development plan enters into force, it leads to economic consequences. In Poland, these consequences are specified in the forecast of the financial impact, which contains a prognosis of own revenues as well as of costs incurred by the budget of the commune. The research consisted in the analysis of the costs of urbanisation of land located in Wrocław, in the southern part of the Krzyki district (Poland). This area is undeveloped to a major extent, consisting mainly of agricultural land, and its development requires the construction of technological and social infrastructure facilities. The expected costs of the realisation of local spatial development plans that are binding for the southern part of Wrocław demonstrate significant costs of the construction of sewage network and municipal roads. The planned development of residential districts is not supported by the existing infrastructure. Additionally, the development of new areas will require the city of Wrocław to take over the real properties on which public goals are planned to be realised. The estimated costs of land acquisition for the realisation of public goals amount to EUR 3 728 500.
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
ERIC Educational Resources Information Center
Keller, Edward C.; Hartman, William T.
2001-01-01
Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…
Construction concepts and validation of the 3D printed UST_2 modular stellarator
NASA Astrophysics Data System (ADS)
Queral, V.
2015-03-01
High accuracy, geometric complexity and thus high cost of stellarators tend to hinder the advance of stellarator research. Nowadays, new manufacturing methods might be developed for the production of small and middle-size stellarators. The methods should demonstrate advantages with respect common fabrication methods, like casting, cutting, forging and welding, for the construction of advanced highly convoluted modular stellarators. UST2 is a small modular three period quasi-isodynamic stellarator of major radius 0.26 m and plasma volume 10 litres being currently built to validate additive manufacturing (3D printing) for stellarator construction. The modular coils are wound in grooves defined on six 3D printed half period frames designed as light truss structures filled by a strong filler. A geometrically simple assembling configuration has been concocted for UST2 so as to try to lower the cost of the device while keeping the positioning accuracy of the different elements. The paper summarizes the construction and assembling concepts developed, the devised positioning methodology, the design of the coil frames and positioning elements and, an initial validation of the assembling of the components.
Swarming Robot Design, Construction and Software Implementation
NASA Technical Reports Server (NTRS)
Stolleis, Karl A.
2014-01-01
In this paper is presented an overview of the hardware design, construction overview, software design and software implementation for a small, low-cost robot to be used for swarming robot development. In addition to the work done on the robot, a full simulation of the robotic system was developed using Robot Operating System (ROS) and its associated simulation. The eventual use of the robots will be exploration of evolving behaviors via genetic algorithms and builds on the work done at the University of New Mexico Biological Computation Lab.
Construction cost forecast model : model documentation and technical notes.
DOT National Transportation Integrated Search
2013-05-01
Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...
Trends in highway construction costs in Louisiana : technical summary.
DOT National Transportation Integrated Search
1999-09-01
The objectives of this study are to observe past trends in highway construction costs in Louisiana, identify factors that determine these costs, quantify their impact, and establish a model that can be used to predict future construction cost in Loui...
Costs of Occupational Injuries in Construction in the United States
Waehrer, Geetha M.; Dong, Xiuwen S.; Miller, Ted; Haile, Elizabeth; Men, Yurong
2008-01-01
This paper presents costs of fatal and non-fatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and non-fatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry’s total fatal and non-fatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs. PMID:17920850
48 CFR 9904.417 - Cost of money as an element of the cost of capital assets under construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... element of the cost of capital assets under construction. 9904.417 Section 9904.417 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT... of money as an element of the cost of capital assets under construction. ...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2010 CFR
2010-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2014 CFR
2014-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2011 CFR
2011-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2012 CFR
2012-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
33 CFR 203.47 - Modifications to non-Federal flood control works.
Code of Federal Regulations, 2013 CFR
2013-07-01
... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is... only in cash. In-kind services are not permitted for modification work. (b) Protection of additional...
ERIC Educational Resources Information Center
Kennedy, Mike
2012-01-01
Even though the economy has not bounced back, many education institutions have to provide additional space to accommodate increased enrollment or new programs, and even at schools and universities where the student population is stagnant or declining, some facilities are aging and outdated--as the cost of renovating or replacing them grows every…
75 FR 70604 - Wireless E911 Location Accuracy Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... carriers are unable to recover the substantial cost of constructing a large number of additional cell sites... characteristics, cell site density, overall system technology requirements, etc.) while, in either case, ensuring... the satellites and the handset. The more extensive the tree cover, the greater the difficulty the...
Heating, Ventilation, and Air Conditioning Design Strategy for a Hot-Humid Production Builder
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2014-03-01
BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The followingmore » research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
HVAC Design Strategy for a Hot-Humid Production Builder, Houston, Texas (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
BSC worked directly with the David Weekley Homes - Houston division to redesign three floor plans in order to locate the HVAC system in conditioned space. The purpose of this project is to develop a cost effective design for moving the HVAC system into conditioned space. In addition, BSC conducted energy analysis to calculate the most economical strategy for increasing the energy performance of future production houses. This is in preparation for the upcoming code changes in 2015. The builder wishes to develop an upgrade package that will allow for a seamless transition to the new code mandate. The followingmore » research questions were addressed by this research project: 1. What is the most cost effective, best performing and most easily replicable method of locating ducts inside conditioned space for a hot-humid production home builder that constructs one and two story single family detached residences? 2. What is a cost effective and practical method of achieving 50% source energy savings vs. the 2006 International Energy Conservation Code for a hot-humid production builder? 3. How accurate are the pre-construction whole house cost estimates compared to confirmed post construction actual cost? BSC and the builder developed a duct design strategy that employs a system of dropped ceilings and attic coffers for moving the ductwork from the vented attic to conditioned space. The furnace has been moved to either a mechanical closet in the conditioned living space or a coffered space in the attic.« less
48 CFR 36.518 - Work oversight in cost-reimbursement construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-reimbursement construction contracts. 36.518 Section 36.518 Federal Acquisition Regulations System FEDERAL... Contract Clauses 36.518 Work oversight in cost-reimbursement construction contracts. The contracting officer shall insert the clause at 52.236-18, Work Oversight in Cost-Reimbursement Construction Contracts...
Space construction system analysis. Part 2: Cost and programmatics
NASA Technical Reports Server (NTRS)
Vonflue, F. W.; Cooper, W.
1980-01-01
Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.
Optimizing and controlling earthmoving operations using spatial technologies
NASA Astrophysics Data System (ADS)
Alshibani, Adel
This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.
Highway Cost Index Estimator Tool
DOT National Transportation Integrated Search
2017-10-01
To plan and program highway construction projects, the Texas Department of Transportation requires accurate construction cost data. However, due to the number of, and uncertainty of, variables that affect highway construction costs, estimating future...
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
25 CFR 136.2 - Construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...
48 CFR 36.215 - Special procedures for cost-reimbursement contracts for construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... cost-reimbursement contracts for construction. 36.215 Section 36.215 Federal Acquisition Regulations...-reimbursement contracts for construction. Contracting officers may use a cost-reimbursement contract to acquire... limitation on cost-reimbursement contracts). [48 FR 42356, Sept. 19, 1983. Redesignated at 62 FR 272, Jan. 2...
NASA Astrophysics Data System (ADS)
Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.
2018-05-01
Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.
Environmental trade-offs of tunnels vs cut-and-cover subways
Walton, M.
1978-01-01
Heavy construction projects in cities entail two kinds of cost - internal cost, which can be defined in terms of payments from one set of parties to another, and external cost, which is the cost borne by the community at large as the result of disutilities entailed in construction and operation. Environmental trade-offs involve external costs, which are commonly difficult to measure. Cut-and-cover subway construction probably entails higher external and internal cost than deep tunnel construction in many urban geological environments, but uncertainty concerning the costs and environmental trade-offs of tunneling leads to limited and timid use of tunneling by American designers. Thus uncertainty becomes a major trade-off which works against tunneling. The reverse is true in Sweden after nearly 30 years of subway construction. Econometric methods for measuring external costs exist in principle, but are limited in application. Economic theory based on market pressure does not address the real problem of urban environmental trade-offs. Nevertheless, the problem of uncertainty can be addressed by comparative studies of estimated and as-built costs of cut-and-cover vs tunnel projects and a review of environmental issues associated with such construction. Such a study would benefit the underground construction industry and the design of transportation systems. It would also help solve an aspect of the urban problem. ?? 1978.
Economic evaluation of nebulized magnesium sulphate in acute severe asthma in children.
Petrou, Stavros; Boland, Angela; Khan, Kamran; Powell, Colin; Kolamunnage-Dona, Ruwanthi; Lowe, John; Doull, Iolo; Hood, Kerry; Williamson, Paula
2014-10-01
The aim of this study was to estimate the cost-effectiveness of nebulized magnesium sulphate (MgSO4) in acute asthma in children from the perspective of the UK National Health Service and personal social services. An economic evaluation was conducted based on evidence from a randomized placebo controlled multi-center trial of nebulized MgSO4 in severe acute asthma in children. Participants comprised 508 children aged 2-16 years presenting to an emergency department or a children's assessment unit with severe acute asthma across thirty hospitals in the United Kingdom. Children were randomly allocated to receive nebulized salbutamol and ipratropium bromide mixed with either 2.5 ml of isotonic MgSO4 or 2.5 ml of isotonic saline on three occasions at 20-min intervals. Cost-effectiveness outcomes were constructed around the Yung Asthma Severity Score (ASS) after 60 min of treatment; whilst cost-utility outcomes were constructed around the quality-adjusted life-year (QALY) metric. The nonparametric bootstrap method was used to present cost-effectiveness acceptability curves at alternative cost-effectiveness thresholds for either: (i) a unit reduction in ASS; or (ii) an additional QALY. MgSO4 had a 75.1 percent probability of being cost-effective at a GBP 1,000 (EUR 1,148) per unit decrement in ASS threshold, an 88.0 percent probability of being more effective (in terms of reducing the ASS) and a 36.6 percent probability of being less costly. MgSO4 also had a 67.6 percent probability of being cost-effective at a GBP 20,000 (EUR 22,957) per QALY gained threshold, an 8.5 percent probability of being more effective (in terms of generating increased QALYs) and a 69.1 percent probability of being less costly. Sensitivity analyses showed that the results of the economic evaluation were particularly sensitive to the methods used for QALY estimation. The probability of cost-effectiveness of nebulized isotonic MgSO4, given as an adjuvant to standard treatment of severe acute asthma in children, is less than 70 percent across accepted cost-effectiveness thresholds for an additional QALY.
Hatziandreu, E J; Brown, R E; Revicki, D A; Turner, R; Martindale, J; Levine, S; Siegel, J E
1994-03-01
The objective of this study was to model, for patients at risk of recurrent depression, the cost-utility of maintenance therapy with sertraline compared with treatment of acute episodes with dothiepin ('episodic treatment'). Using clinical decision analysis techniques, a Markov state-transition model was constructed to estimate the lifetime costs and quality-adjusted life-years (QALYs) of the 2 therapeutic strategies. The model follows 2 cohorts of 35-year-old women at high risk for recurrent depression over their lifetimes. Model construction and relevant data (probabilities) for performing the analysis were based on existing clinical knowledge. Two physician panels were used to obtain estimates of recurrence probabilities not available in the literature, health utilities, and resource consumption. Costs were obtained from published sources. The baseline analysis showed that it costs 2172 British pounds sterling ($US3692, 1991 currency) to save an additional QALY with sertraline maintenance treatment. Sensitivity analysis showed that the incremental cost-utility ratio ranged from 557 British pounds sterling to 5260 British pounds sterling per QALY. Overall, the resulting ratios are considered to be well within the range of cost-utility ratios that support the adoption and appropriate utilisation of a technology. Based on the study assumptions, long term maintenance treatment with sertraline appears to be clinically and economically justified choice for patients at high risk of recurrent depression.
Oil and gas pipeline construction cost analysis and developing regression models for cost estimation
NASA Astrophysics Data System (ADS)
Thaduri, Ravi Kiran
In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.
Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.
ERIC Educational Resources Information Center
Bilginsoy, Cihan; Philips, Peter
2000-01-01
Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…
Social cost in construction projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less
Caceda, Sonia Indacochea; Ramos, Richard Rubio; Saborido, Carlos Martín
2018-01-01
Postpartum hemorrhage is one of the main causes of maternal death. Oxytocin has traditionally been used to prevent postpartum hemorrhage. To compare oxytocin with carbetocin, a long-acting analog of oxytocin, for prevention of uterine hemorrhage after cesarean delivery. Clinical data were retrieved from the 2012 Cochrane meta-analysis "Carbetocin for preventing postpartum hemorrhage". A decision tree was constructed. The direct costs were those of medications from the Peruvian official price list (DIGEMID). Costs associated with additional oxytocic drugs, blood transfusions, postpartum hemorrhage kits and hysterectomy were obtained from Hospital Nacional Edgardo Rebagliati Martins. The perspective of the study was that of the payer. The time horizon for calculating quality-adjusted life years (QALYs) was 1 year (2015). Patients who received carbetocin required fewer additional uterotonic agents, had fewer hemorrhages and received fewer blood transfusions. Therefore, the costs associated with these interventions were lower. The incremental cost-effectiveness ratio was S/. 49,918 per QALY gained, which is lower than the threshold we estimated for Peru. Carbetocin is more cost-effective than oxytocin for prevention of uterine hemorrhage after cesarean delivery.
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
NASA Technical Reports Server (NTRS)
Brown, J. A.
1985-01-01
This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
Additive manufacturing method for SRF components of various geometries
Rimmer, Robert; Frigola, Pedro E; Murokh, Alex Y
2015-05-05
An additive manufacturing method for forming nearly monolithic SRF niobium cavities and end group components of arbitrary shape with features such as optimized wall thickness and integral stiffeners, greatly reducing the cost and technical variability of conventional cavity construction. The additive manufacturing method for forming an SRF cavity, includes atomizing niobium to form a niobium powder, feeding the niobium powder into an electron beam melter under a vacuum, melting the niobium powder under a vacuum in the electron beam melter to form an SRF cavity; and polishing the inside surface of the SRF cavity.
Passive solar addition to therapeutic pre-school. Final technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-10-01
This project consisted of designing and constructing a passive solar system on a new classroom addition to the Peanut Butter and Jelly Therapeutic Pre-School in Albuquerque, NM. The purpose of this project was to demonstrate the applicability of solar space heating systems to large institutional buildings, and to demonstrate the energy and cost savings available through the use of such systems. Preliminary estimates indicated that the passive solar systems will provide about 90 percent of the heating and cooling needs for the new classroom addition to the school.
Preliminary study of neutron absorption by concrete with boron carbide addition
NASA Astrophysics Data System (ADS)
Abdullah, Yusof; Ariffin, Fatin Nabilah Tajul; Hamid, Roszilah; Yusof, Mohd Reusmaazran; Zali, Nurazila Mat; Ahmad, Megat Harun Al Rashid Megat; Yazid, Hafizal; Ahmad, Sahrim; Mohamed, Abdul Aziz
2014-02-01
Concrete has become a conventional material in construction of nuclear reactor due to its properties like safety and low cost. Boron carbide was added as additives in the concrete construction as it has a good neutron absorption property. The sample preparation for concrete was produced with different weight percent of boron carbide powder content. The neutron absorption rate of these samples was determined by using a fast neutron source of Americium-241/Be (Am-Be 241) and detection with a portable backscattering neutron detector. Concrete with 20 wt % of boron carbide shows the lowest count of neutron transmitted and this indicates the most neutrons have been absorbed by the concrete. Higher boron carbide content may affect the concrete strength and other properties.
SNL/CA Facilities Management Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rabb, David; Clark, Eva
2014-12-01
At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less
Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272
DOT National Transportation Integrated Search
2009-12-22
One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...
Hydropower Baseline Cost Modeling
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.
Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.« less
Hydropower Baseline Cost Modeling, Version 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, Patrick W.
Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.« less
ERIC Educational Resources Information Center
Gopal, Venkatesh; Klosowiak, Julian L.; Jaeger, Robert; Selimkhanov, Timur; Hartmann, Mitra J. Z.
2008-01-01
We describe the construction and operation of three low-cost schlieren imaging systems that can be fabricated using surplus optics and 80/20, an aluminium extrusion based construction system. Each system has a different optical configuration. The low cost and ease of construction makes these systems highly suitable for high-school and…
1990-09-01
following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W
Cost estimators for construction of forest roads in the central Appalachians
Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler
1992-01-01
Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...
Improving building performance using smart building concept: Benefit cost ratio comparison
NASA Astrophysics Data System (ADS)
Berawi, Mohammed Ali; Miraj, Perdana; Sayuti, Mustika Sari; Berawi, Abdur Rohim Boy
2017-11-01
Smart building concept is an implementation of technology developed in the construction industry throughout the world. However, the implementation of this concept is still below expectations due to various obstacles such as higher initial cost than a conventional concept and existing regulation siding with the lowest cost in the tender process. This research aims to develop intelligent building concept using value engineering approach to obtain added value regarding quality, efficiency, and innovation. The research combined quantitative and qualitative approach using questionnaire survey and value engineering method to achieve the research objectives. The research output will show additional functions regarding technology innovation that may increase the value of a building. This study shows that smart building concept requires higher initial cost, but produces lower operational and maintenance costs. Furthermore, it also confirms that benefit-cost ratio on the smart building was much higher than a conventional building, that is 1.99 to 0.88.
Space Station Facility government estimating
NASA Technical Reports Server (NTRS)
Brown, Joseph A.
1993-01-01
This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 18 ways the low bidders get low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.
Optimization of Production Lines and Cross-sections of Fiberglass Rebar
NASA Astrophysics Data System (ADS)
Maksimov, S. P.; Dildin, A. N.; Maksimova, A. E.
2017-11-01
The article substantiates the need of the construction industry in new lightweight and durable materials that ensure reduction in the cost of work and increase in the operational characteristics of the constructed facilities. These materials include fiberglass reinforcement which is an auxiliary bar made of heavy-duty glass fibers impregnated with a polymer adhesive composition and additionally entwined to create a ribbed surface and tight fit with fiberglass threads. This fitting has undeniable advantages in comparison with steel fittings. The polymer composite is resistant to corroding medium, does not corrode, does not conduct electricity, has high elastic properties, low thermal conductivity, increased tensile strength, etc. It is shown that the issues related to the improvement of technology and the form of a fiberglass rebar section are relevant for the construction industry. So, in particular, the presented developments will significantly reduce the consumption of adhesive composition for impregnating roving threads, reduce production costs by eliminating the loss of adhesive composition in impregnating vessels and pull-guide rollers, increasing the environmental friendliness of production and increasing the line productivity. In addition, it is possible to improve the strength characteristics by optimizing the cross-section and longitudinal cross-sections of the resulting fiberglass reinforcement. The presented changes in the design and technology of fiberglass reinforcement production can be realized as a separate independent module. It is easy to integrate into existing lines during repair work or routine maintenance of equipment.
Germaine, Kieran J.; Byrne, John; Liu, Xuemei; Keohane, Jer; Culhane, John; Lally, Richard D.; Kiwanuka, Samuel; Ryan, David; Dowling, David N.
2015-01-01
Biopiling is an ex situ bioremediation technology that has been extensively used for remediating a wide range of petrochemical contaminants in soils. Biopiling involves the assembling of contaminated soils into piles and stimulating the biodegrading activity of microbial populations by creating near optimum growth conditions. Phytoremediation is another very successful bioremediation technique and involves the use of plants and their associated microbiomes to degrade, sequester or bio-accumulate pollutants from contaminated soil and water. The objective of this study was to investigate the effectiveness of a combined phytoremediation/biopiling system, termed Ecopiling, to remediate hydrocarbon impacted industrial soil. The large scale project was carried out on a sandy loam, petroleum impacted soil [1613 mg total petroleum hydrocarbons (TPHs) kg-1 soil]. The contaminated soil was amended with chemical fertilizers, inoculated with TPH degrading bacterial consortia and then used to construct passive biopiles. Finally, a phyto-cap of perennial rye grass (Lolium perenne) and white clover (Trifolium repens) was sown on the soil surface to complete the Ecopile. Monitoring of important physico-chemical parameters was carried out at regular intervals throughout the trial. Two years after construction the TPH levels in the petroleum impacted Ecopiles were below detectable limits in all but one subsample (152 mg TPH kg-1 soil). The Ecopile system is a multi-factorial bioremediation process involving bio-stimulation, bio-augmentation and phytoremediation. One of the key advantages to this system is the reduced costs of the remediation process, as once constructed, there is little additional cost in terms of labor and maintenance (although the longer process time may incur additional monitoring costs). The other major advantage is that many ecological functions are rapidly restored to the site and the process is esthetically pleasing. PMID:25601875
Germaine, Kieran J; Byrne, John; Liu, Xuemei; Keohane, Jer; Culhane, John; Lally, Richard D; Kiwanuka, Samuel; Ryan, David; Dowling, David N
2014-01-01
Biopiling is an ex situ bioremediation technology that has been extensively used for remediating a wide range of petrochemical contaminants in soils. Biopiling involves the assembling of contaminated soils into piles and stimulating the biodegrading activity of microbial populations by creating near optimum growth conditions. Phytoremediation is another very successful bioremediation technique and involves the use of plants and their associated microbiomes to degrade, sequester or bio-accumulate pollutants from contaminated soil and water. The objective of this study was to investigate the effectiveness of a combined phytoremediation/biopiling system, termed Ecopiling, to remediate hydrocarbon impacted industrial soil. The large scale project was carried out on a sandy loam, petroleum impacted soil [1613 mg total petroleum hydrocarbons (TPHs) kg(-1) soil]. The contaminated soil was amended with chemical fertilizers, inoculated with TPH degrading bacterial consortia and then used to construct passive biopiles. Finally, a phyto-cap of perennial rye grass (Lolium perenne) and white clover (Trifolium repens) was sown on the soil surface to complete the Ecopile. Monitoring of important physico-chemical parameters was carried out at regular intervals throughout the trial. Two years after construction the TPH levels in the petroleum impacted Ecopiles were below detectable limits in all but one subsample (152 mg TPH kg(-1) soil). The Ecopile system is a multi-factorial bioremediation process involving bio-stimulation, bio-augmentation and phytoremediation. One of the key advantages to this system is the reduced costs of the remediation process, as once constructed, there is little additional cost in terms of labor and maintenance (although the longer process time may incur additional monitoring costs). The other major advantage is that many ecological functions are rapidly restored to the site and the process is esthetically pleasing.
De Boever, A L; Keersmaekers, K; Vanmaele, G; Kerschbaum, T; Theuniers, G; De Boever, J A
2006-11-01
One hundred and seventy-two fixed reconstructions (317 prosthetic units), made on 283 ITI implants in 105 patients (age range 25-86 years) with a minimum follow-up period of 40 months, were taken into the study to analyse technical complication rate, complication type and costs for repair. The mean evaluation time was 62.5 +/- 25.3 months. Eighty were single crowns and 92 different types of fixed partial dentures (FPDs). In 45 cases the construction was screw retained and in 127 cases cemented with zinc phosphate cement or an acrylic-based cement. Complications occurred after a minimum period of 2 months and a maximum period of 100 months (mean: 35.9 +/- 21.4 months). Fifty-five prosthetic interventions were needed on 44 constructions (25%) of which 88% in the molar/premolar region. The lowest percentage of complications occurred in single crowns (25%), the highest in 3-4 unit FPDs (35%) and in FPDs with an extension (44%). Of the necessary clinical repair, 36% was recementing and 38% tightening the screws. Of all interventions, 14% were classified as minor (no treatment or <10 min chair time), 70% as moderate (>10 min but <60 min chair time) and 14% as major interventions (>60 min and additional costs for replacement of parts and/or laboratory). For seven patients the additional costs ranged from euro 28 to euro 840. Bruxing seemed to play a significant role in the frequency of complications. Longer constructions seemed to be more prone to complications. The relatively high occurrence of technical complications should be discussed with the patient before the start of the treatment.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-09
... economies of scale and other cost saving measures for deployments that are already planned. In addition, Petitioners could benefit from the announced plans of some commercial carriers to begin construction of LTE... an open platform for development and testing of public safety 700 MHz LTE broadband equipment. This...
NASA Technical Reports Server (NTRS)
1992-01-01
Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.
Investigation of test methods, material properties and processes for solar cell encapsulants
NASA Technical Reports Server (NTRS)
Willis, P. B.; Baum, B.
1983-01-01
The goal of the program is to identify, test, evaluate and recommend encapsulation materials and processes for the fabrication of cost-effective and long life solar modules. Of the $18 (1948 $) per square meter allocated for the encapsulation components approximately 50% of the cost ($9/sq m) may be taken by the load bearing component. Due to the proportionally high cost of this element, lower costing materials were investigated. Wood based products were found to be the lowest costing structural materials for module construction, however, they require protection from rainwater and humidity in order to acquire dimensional stability. The cost of a wood product based substrate must, therefore, include raw material costs plus the cost of additional processing to impart hygroscopic inertness. This protection is provided by a two step, or split process in which a flexible laminate containing the cell string is prepared, first in a vacuum process and then adhesively attached with a back cover film to the hardboard in a subsequent step.
Age in Relation to Worker Compensation Costs in the Construction Industry
Schwatka, Natalie V.; Butler, Lesley M.; Rosecrance, John C.
2015-01-01
Background A better understanding of how workers’ compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. Methods The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Results Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18–24. Conclusions Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. PMID:22782837
Age in relation to worker compensation costs in the construction industry.
Schwatka, Natalie V; Butler, Lesley M; Rosecrance, John C
2013-03-01
A better understanding of how workers' compensation (WC) costs are affected by an aging US workforce is needed, especially for physically demanding industries, such as construction. The relationship between age and injury type on claim costs was evaluated using a database of 107,064 Colorado WC claims filed between 1998 and 2008 among construction workers. Mean WC costs increased with increasing age for total cost (P < 0.0001), medical costs (P < 0.0001), and indemnity costs (P < 0.0001). For each one-year increase in age, indemnity, and medical costs increased by 3.5% and 1.1%, respectively. For specific injury types, such as strains and contusions, the association between age and indemnity costs was higher among claimants aged ≥65 compared to claimants aged 18-24. Our findings suggest that specific injury types may be partially responsible for the higher indemnity costs among older construction workers, compared with their younger coworkers. Copyright © 2012 Wiley Periodicals, Inc.
25 CFR 136.3 - Repayment of construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Repayment of construction costs. 136.3 Section 136.3 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.3 Repayment of construction costs. Under the terms of the contracts, the...
Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].
ERIC Educational Resources Information Center
Geothermal Heat Pump Consortium, Inc., Washington, DC.
A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)
48 CFR 52.236-18 - Work Oversight in Cost-Reimbursement Construction Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-Reimbursement Construction Contracts. 52.236-18 Section 52.236-18 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-18 Work Oversight in Cost-Reimbursement Construction Contracts. As prescribed in 36.518, insert the following clause in solicitations and contracts when cost-reimbursement...
A Cost-Minimization Analysis of Tissue-Engineered Constructs for Corneal Endothelial Transplantation
Tan, Tien-En; Peh, Gary S. L.; George, Benjamin L.; Cajucom-Uy, Howard Y.; Dong, Di; Finkelstein, Eric A.; Mehta, Jodhbir S.
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses. PMID:24949869
Tan, Tien-En; Peh, Gary S L; George, Benjamin L; Cajucom-Uy, Howard Y; Dong, Di; Finkelstein, Eric A; Mehta, Jodhbir S
2014-01-01
Corneal endothelial transplantation or endothelial keratoplasty has become the preferred choice of transplantation for patients with corneal blindness due to endothelial dysfunction. Currently, there is a worldwide shortage of transplantable tissue, and demand is expected to increase further with aging populations. Tissue-engineered alternatives are being developed, and are likely to be available soon. However, the cost of these constructs may impair their widespread use. A cost-minimization analysis comparing tissue-engineered constructs to donor tissue procured from eye banks for endothelial keratoplasty was performed. Both initial investment costs and recurring costs were considered in the analysis to arrive at a final tissue cost per transplant. The clinical outcomes of endothelial keratoplasty with tissue-engineered constructs and with donor tissue procured from eye banks were assumed to be equivalent. One-way and probabilistic sensitivity analyses were performed to simulate various possible scenarios, and to determine the robustness of the results. A tissue engineering strategy was cheaper in both investment cost and recurring cost. Tissue-engineered constructs for endothelial keratoplasty could be produced at a cost of US$880 per transplant. In contrast, utilizing donor tissue procured from eye banks for endothelial keratoplasty required US$3,710 per transplant. Sensitivity analyses performed further support the results of this cost-minimization analysis across a wide range of possible scenarios. The use of tissue-engineered constructs for endothelial keratoplasty could potentially increase the supply of transplantable tissue and bring the costs of corneal endothelial transplantation down, making this intervention accessible to a larger group of patients. Tissue-engineering strategies for corneal epithelial constructs or other tissue types, such as pancreatic islet cells, should also be subject to similar pharmacoeconomic analyses.
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.
Ostensson, Ellinor; Fröberg, Maria; Hjerpe, Anders; Zethraeus, Niklas; Andersson, Sonia
2010-10-01
To assess the cost-effectiveness of using human papillomavirus testing (HPV triage) in the management of women with minor cytological abnormalities in Sweden. An economic analysis based on a clinical trial, complemented with data from published meta-analyses on accuracy of HPV triage. The study takes perspective of the Swedish healthcare system. The Swedish population-based cervical cancer screening program. A decision analytic model was constructed to evaluate cost-effectiveness of HPV triage compared to repeat cytology and immediate colposcopy with biopsy, stratifying by index cytology (ASCUS = atypical squamous cells of undetermined significance, and LSIL = low-grade squamous intraepithelial lesion) and age (23-60 years, <30 years and ≥30 years). Costs, incremental cost, incremental effectiveness and incremental cost per additional high-grade lesion (CIN2+) detected. For women with ASCUS ≥30 years, HPV triage is the least costly alternative, whereas immediate colposcopy with biopsy provides the most effective option at an incremental cost-effectiveness ratio (ICER) of SEK 2,056 per additional case of CIN2+ detected. For LSIL (all age groups) and ASCUS (23-60 years and <30 years), HPV triage is dominated by immediate colposcopy and biopsy. Model results were sensitive to HPV test cost changes. With improved HPV testing techniques at lower costs, HPV triage can become a cost-effective alternative for follow-up of minor cytological abnormalities. Today, immediate colposcopy with biopsy is a cost-effective alternative compared to HPV triage and repeat cytology.
Cost-effectiveness acceptability curves revisited.
Al, Maiwenn J
2013-02-01
Since the introduction of the cost-effectiveness acceptability curve (CEAC) in 1994, its use as a method to describe uncertainty around incremental cost-effectiveness ratios (ICERs) has steadily increased. In this paper, first the construction and interpretation of the CEAC is explained, both in the context of modelling studies and in the context of cost-effectiveness (CE) studies alongside clinical trials. Additionally, this paper reviews the advantages and limitations of the CEAC. Many of the perceived limitations can be attributed to the practice of interpreting the CEAC as a decision rule while it was not developed as such. It is argued that the CEAC is still a useful tool in describing and quantifying uncertainty around the ICER, especially in combination with other tools such as plots on the CE plane and value-of-information analysis.
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...
NASA Astrophysics Data System (ADS)
Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat
2017-07-01
Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.
Preliminary study of neutron absorption by concrete with boron carbide addition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abdullah, Yusof, E-mail: yusofabd@nuclearmalaysia.gov.my; Yusof, Mohd Reusmaazran; Zali, Nurazila Mat
2014-02-12
Concrete has become a conventional material in construction of nuclear reactor due to its properties like safety and low cost. Boron carbide was added as additives in the concrete construction as it has a good neutron absorption property. The sample preparation for concrete was produced with different weight percent of boron carbide powder content. The neutron absorption rate of these samples was determined by using a fast neutron source of Americium-241/Be (Am-Be 241) and detection with a portable backscattering neutron detector. Concrete with 20 wt % of boron carbide shows the lowest count of neutron transmitted and this indicates themore » most neutrons have been absorbed by the concrete. Higher boron carbide content may affect the concrete strength and other properties.« less
Coupé, Veerle M. H.; Knottnerus, Bart J.; Geerlings, Suzanne E.; Moll van Charante, Eric P.; ter Riet, Gerben
2017-01-01
Background Uncomplicated Urinary Tract Infections (UTIs) are common in primary care resulting in substantial costs. Since antimicrobial resistance against antibiotics for UTIs is rising, accurate diagnosis is needed in settings with low rates of multidrug-resistant bacteria. Objective To compare the cost-effectiveness of different strategies to diagnose UTIs in women who contacted their general practitioner (GP) with painful and/or frequent micturition between 2006 and 2008 in and around Amsterdam, The Netherlands. Methods This is a model-based cost-effectiveness analysis using data from 196 women who underwent four tests: history, urine stick, sediment, dipslide, and the gold standard, a urine culture. Decision trees were constructed reflecting 15 diagnostic strategies comprising different parallel and sequential combinations of the four tests. Using the decision trees, for each strategy the costs and the proportion of women with a correct positive or negative diagnosis were estimated. Probabilistic sensitivity analysis was used to estimate uncertainty surrounding costs and effects. Uncertainty was presented using cost-effectiveness planes and acceptability curves. Results Most sequential testing strategies resulted in higher proportions of correctly classified women and lower costs than parallel testing strategies. For different willingness to pay thresholds, the most cost-effective strategies were: 1) performing a dipstick after a positive history for thresholds below €10 per additional correctly classified patient, 2) performing both a history and dipstick for thresholds between €10 and €17 per additional correctly classified patient, 3) performing a dipstick if history was negative, followed by a sediment if the dipstick was negative for thresholds between €17 and €118 per additional correctly classified patient, 4) performing a dipstick if history was negative, followed by a dipslide if the dipstick was negative for thresholds above €118 per additional correctly classified patient. Conclusion Depending on decision makers’ willingness to pay for one additional correctly classified woman, the strategy consisting of performing a history and dipstick simultaneously (ceiling ratios between €10 and €17) or performing a sediment if history and subsequent dipstick are negative (ceiling ratios between €17 and €118) are the most cost-effective strategies to diagnose a UTI. PMID:29186185
Bosmans, Judith E; Coupé, Veerle M H; Knottnerus, Bart J; Geerlings, Suzanne E; Moll van Charante, Eric P; Ter Riet, Gerben
2017-01-01
Uncomplicated Urinary Tract Infections (UTIs) are common in primary care resulting in substantial costs. Since antimicrobial resistance against antibiotics for UTIs is rising, accurate diagnosis is needed in settings with low rates of multidrug-resistant bacteria. To compare the cost-effectiveness of different strategies to diagnose UTIs in women who contacted their general practitioner (GP) with painful and/or frequent micturition between 2006 and 2008 in and around Amsterdam, The Netherlands. This is a model-based cost-effectiveness analysis using data from 196 women who underwent four tests: history, urine stick, sediment, dipslide, and the gold standard, a urine culture. Decision trees were constructed reflecting 15 diagnostic strategies comprising different parallel and sequential combinations of the four tests. Using the decision trees, for each strategy the costs and the proportion of women with a correct positive or negative diagnosis were estimated. Probabilistic sensitivity analysis was used to estimate uncertainty surrounding costs and effects. Uncertainty was presented using cost-effectiveness planes and acceptability curves. Most sequential testing strategies resulted in higher proportions of correctly classified women and lower costs than parallel testing strategies. For different willingness to pay thresholds, the most cost-effective strategies were: 1) performing a dipstick after a positive history for thresholds below €10 per additional correctly classified patient, 2) performing both a history and dipstick for thresholds between €10 and €17 per additional correctly classified patient, 3) performing a dipstick if history was negative, followed by a sediment if the dipstick was negative for thresholds between €17 and €118 per additional correctly classified patient, 4) performing a dipstick if history was negative, followed by a dipslide if the dipstick was negative for thresholds above €118 per additional correctly classified patient. Depending on decision makers' willingness to pay for one additional correctly classified woman, the strategy consisting of performing a history and dipstick simultaneously (ceiling ratios between €10 and €17) or performing a sediment if history and subsequent dipstick are negative (ceiling ratios between €17 and €118) are the most cost-effective strategies to diagnose a UTI.
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
48 CFR 31.205-10 - Cost of money.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the cost of capital assets under construction (48 CFR 9904.417). (b) Cost of money is allowable... measured and added to the cost of capital assets under construction in accordance with 48 CFR 9904.417, as... proposals relating to the contract under which the cost is to be claimed. (c) Actual interest cost in lieu...
U.S. Department of Energy Zero Energy Ready Home Implementation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rothgeb, Stacey K; Schirber, T.; Mosiman, G.
The intention of this project is to assist home builders in the upper Midwest in achieving DOE Zero Energy Ready Home program certification, and to document the process and outcomes involved in meeting this rigorous standard. NorthernSTAR, in conjunction with our program partner Building Knowledge, Inc., provided technical support to the builders during the design and construction process. At the time of this publication, four qualifying homes have been completed and an additional three are currently under construction to be completed later this year. Three additional homes were excluded from certification due to the HVAC contractor not completing their requiredmore » credentialing until after completion of the homes, though the energy performance would have otherwise qualified the homes for program certification. Both Amaris Homes and Cobblestone Homes note that participation in the ZERH program provides them with competitive advantage in the market place at reasonable construction costs that also result in extremely satisfied clients who are willing to recommend the builders to friends and family.« less
A cost per live birth comparison of HMG and rFSH randomized trials.
Connolly, Mark; De Vrieze, Kathleen; Ombelet, Willem; Schneider, Dirk; Currie, Craig
2008-12-01
To help inform healthcare treatment practices and funding decisions, an economic evaluation was conducted to compare the two leading gonadotrophins used for IVF in Belgium. Based on the results of a recently published meta-analysis, a simulated decision tree model was constructed with four states: (i) fresh cycle, (ii) cryopreserved cycle, (iii) live birth and (iv) treatment withdrawal. Gonadotrophin costs were based on highly purified human menopausal gonadotrophin (HP-HMG; Menopur) and recombinant FSH (rFSH) alpha (Gonal-F). After one fresh and one cryopreserved cycle the average treatment cost with HP-HMG was lower than with rFSH (HP-HMG euro3635; rFSH euro4103). The average cost saving per person started on HP-HMG when compared with rFSH was euro468. Additionally, the average costs per live birth of HP-HMG and rFSH were found to be significantly different: HP-HMG euro9996; rFSH euro13,009 (P < 0.0001). HP-HMG remained cost-saving even after key parameters in the model were varied in the probabilistic sensitivity analysis. Treatment with HP-HMG was found to be the dominant treatment strategy in IVF because of improved live birth rates and lower costs. Within a fixed healthcare budget, the cost-savings achieved using HP-HMG would allow for the delivery of additional IVF cycles.
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
Hassan, Cesare; Pickhardt, Perry J; Pickhardt, Perry; Laghi, Andrea; Kim, Daniel H; Kim, Daniel; Zullo, Angelo; Iafrate, Franco; Di Giulio, Lorenzo; Morini, Sergio
2008-04-14
In addition to detecting colorectal neoplasia, abdominal computed tomography (CT) with colonography technique (CTC) can also detect unsuspected extracolonic cancers and abdominal aortic aneurysms (AAA).The efficacy and cost-effectiveness of this combined abdominal CT screening strategy are unknown. A computerized Markov model was constructed to simulate the occurrence of colorectal neoplasia, extracolonic malignant neoplasm, and AAA in a hypothetical cohort of 100,000 subjects from the United States who were 50 years of age. Simulated screening with CTC, using a 6-mm polyp size threshold for reporting, was compared with a competing model of optical colonoscopy (OC), both without and with abdominal ultrasonography for AAA detection (OC-US strategy). In the simulated population, CTC was the dominant screening strategy, gaining an additional 1458 and 462 life-years compared with the OC and OC-US strategies and being less costly, with a savings of $266 and $449 per person, respectively. The additional gains for CTC were largely due to a decrease in AAA-related deaths, whereas the modeled benefit from extracolonic cancer downstaging was a relatively minor factor. At sensitivity analysis, OC-US became more cost-effective only when the CTC sensitivity for large polyps dropped to 61% or when broad variations of costs were simulated, such as an increase in CTC cost from $814 to $1300 or a decrease in OC cost from $1100 to $500. With the OC-US approach, suboptimal compliance had a strong negative influence on efficacy and cost-effectiveness. The estimated mortality from CT-induced cancer was less than estimated colonoscopy-related mortality (8 vs 22 deaths), both of which were minor compared with the positive benefit from screening. When detection of extracolonic findings such as AAA and extracolonic cancer are considered in addition to colorectal neoplasia in our model simulation, CT colonography is a dominant screening strategy (ie, more clinically effective and more cost-effective) over both colonoscopy and colonoscopy with 1-time ultrasonography.
PHENIX Work Breakdown Structure. Cost and schedule review copy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flanigan, Tom; Pybus, Craig; Roy, Sonya
This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kenji Akagi; Masayuki Ishiwata; Kenji Araki
In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and generalmore » versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)« less
Cain-Nielsen, Anne H; Moriarty, James P; Stewart, Elizabeth A; Borah, Bijan J
2014-09-01
To evaluate the cost-effectiveness of the following three treatments of uterine fibroids in a population of premenopausal women who wish to preserve their uteri: myomectomy, magnetic resonance-guided focused ultrasound (MRgFUS) and uterine artery embolization (UAE). A decision analytic Markov model was constructed. Cost-effectiveness was calculated in terms of US$ per quality-adjusted life year (QALY) over 5 years. Two types of costs were calculated: direct costs only, and the sum of direct and indirect (productivity) costs. Women in the hypothetical cohort were assessed for treatment type eligibility, were treated based on eligibility, and experienced adequate or inadequate symptom relief. Additional treatment (myomectomy) occurred for inadequate symptom relief or recurrence. Sensitivity analysis was conducted to evaluate uncertainty in the model parameters. In the base case, myomectomy, MRgFUS and UAE had the following combinations of mean cost and mean QALYs, respectively: US$15,459, 3.957; US$15,274, 3.953; and US$18,653, 3.943. When incorporating productivity costs, MRgFUS incurred a mean cost of US$21,232; myomectomy US$22,599; and UAE US$22,819. Using probabilistic sensitivity analysis (PSA) and excluding productivity costs, myomectomy was cost effective at almost every decision threshold. Using PSA and incorporating productivity costs, myomectomy was cost effective at decision thresholds above US$105,000/QALY; MRgFUS was cost effective between US$30,000 and US$105,000/QALY; and UAE was cost effective below US$30,000/QALY. Myomectomy, MRgFUS, and UAE were similarly effective in terms of QALYs gained. Depending on assumptions about costs and willingness to pay for additional QALYs, all three treatments can be deemed cost effective in a 5-year time frame.
Kristopher R. Brown; W. Michael Aust; Kevin J. McGuire
2015-01-01
Reopening of abandoned legacy roads is common in forest operations and represents a reduced cost in comparison to new road construction. However, legacy roads may have lower road standards and require additional best management practice (BMP) implementation upon reopening to protect water quality. Silt fences and elevation measurements of trapped sediment were used to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds aremore » shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.« less
NASA Technical Reports Server (NTRS)
Brown, J. A.
1983-01-01
Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.
Evaluation of ways and procedures to reduce construction cost and increase competition.
DOT National Transportation Integrated Search
2009-01-01
Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...
Sizing and Lifecycle Cost Analysis of an Ares V Composite Interstage
NASA Technical Reports Server (NTRS)
Mann, Troy; Smeltzer, Stan; Grenoble, Ray; Mason, Brian; Rosario, Sev; Fairbairn, Bob
2012-01-01
The Interstage Element of the Ares V launch vehicle was sized using a commercially available structural sizing software tool. Two different concepts were considered, a metallic design and a composite design. Both concepts were sized using similar levels of analysis fidelity and included the influence of design details on each concept. Additionally, the impact of the different manufacturing techniques and failure mechanisms for composite and metallic construction were considered. Significant details were included in analysis models of each concept, including penetrations for human access, joint connections, as well as secondary loading effects. The designs and results of the analysis were used to determine lifecycle cost estimates for the two Interstage designs. Lifecycle cost estimates were based on industry provided cost data for similar launch vehicle components. The results indicated that significant mass as well as cost savings are attainable for the chosen composite concept as compared with a metallic option.
House Construction: How To Reduce Costs
Jerry O. Newman; Norman C. Teter; Constance D. O' Brien
1969-01-01
You're building a house and want to keep down the cost. How can you do it? First, plan carefully "on paper" before you start construction. By doing so, you can avoid costly mistakesinthebuildingandinthe purchase of materials. Careful planning and proper design will reduce not only the initial cost but also the cost of furnishings, utilities, and...
Brettschneider, Christian; Kohlmann, Sebastian; Gierk, Benjamin; Löwe, Bernd; König, Hans-Helmut
2017-01-01
Although depression is common in patients with heart disease, screening for depression is much debated. DEPSCREEN-INFO showed that a patient-targeted feedback in addition to screening results in lower depression level six months after screening. The purpose of this analysis was to perform a cost-effectiveness analysis of DEPSCREEN-INFO. Patients with coronary heart disease or arterial hypertension were included. Participants in both groups were screened for depression. Participants in the intervention group additionally received a patient-targeted feedback of their result and recommended treatment options. A cost-utility analysis using quality-adjusted life years (QALY) based on the EQ-5D was performed. The time horizon was 6 months. Resource utilization was assessed by a telephone interview. Multiple imputation using chained equations was used. Net-benefit regressions controlled for prognostic variables at baseline were performed to construct cost-effectiveness acceptability curves. Different sensitivity analyses were performed. 375 participants (intervention group: 155; control group: 220) were included at baseline. After 6 months, in the intervention group adjusted total costs were lower (-€2,098; SE: €1,717) and more QALY were gained (0.0067; SD: 0.0133); yet differences were not statistically significant. The probability of cost-effectiveness was around 80% independent of the willingness-to-pay (range: €0/QALY-€130,000/QALY). The results were robust. A patient-targeted feedback in addition to depression screening in cardiology is cost-effective with a high probability. This underpins the use of the patient-targeted feedbacks and the PHQ-9 that are both freely available and easy to implement in routine care.
Co-control of urban air pollutants and greenhouse gases in Mexico City.
West, J Jason; Osnaya, Patricia; Laguna, Israel; Martínez, Julia; Fernández, Adrián
2004-07-01
This study addresses the synergies of mitigation measures to control urban air pollutant and greenhouse gas (GHG) emissions, in developing integrated "co-control" strategies for Mexico City. First, existing studies of emissions reduction measures--PROAIRE (the air quality plan for Mexico City) and separate GHG studies--are used to construct a harmonized database of options. Second, linear programming (LP) is developed and applied as a decision-support tool to analyze least-cost strategies for meeting co-control targets for multiple pollutants. We estimate that implementing PROAIRE measures as planned will reduce 3.1% of the 2010 metropolitan CO2 emissions, in addition to substantial local air pollutant reductions. Applying the LP, PROAIRE emissions reductions can be met at a 20% lower cost, using only the PROAIRE measures, by adjusting investments toward the more cost-effective measures; lower net costs are possible by including cost-saving GHG mitigation measures, but with increased investment. When CO2 emission reduction targets are added to PROAIRE targets, the most cost-effective solutions use PROAIRE measures for the majority of local pollutant reductions, and GHG measures for additional CO2 control. Because of synergies, the integrated planning of urban-global co-control can be beneficial, but we estimate that for Mexico City these benefits are often small.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
24 CFR 578.47 - New construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true New construction. 578.47 Section 578... construction. (a) Use. Grant funds may be used to: (1) Pay up to 100 percent of the cost of new construction... the floor area by 100 percent or more, and the cost of land associated with that construction, for use...
Transitioning to High Performance Homes: Successes and Lessons Learned From Seven Builders
DOE Office of Scientific and Technical Information (OSTI.GOV)
Widder, Sarah H.; Kora, Angela R.; Baechler, Michael C.
2013-03-01
As homebuyers are becoming increasingly concerned about rising energy costs and the impact of fossil fuels as a major source of greenhouse gases, the returning new home market is beginning to demand energy-efficient and comfortable high-performance homes. In response to this, some innovative builders are gaining market share because they are able to market their homes’ comfort, better indoor air quality, and aesthetics, in addition to energy efficiency. The success and marketability of these high-performance homes is creating a builder demand for house plans and information about how to design, build, and sell their own low-energy homes. To help makemore » these and other builders more successful in the transition to high-performance construction techniques, Pacific Northwest National Laboratory (PNNL) partnered with seven interested builders in the hot humid and mixed humid climates to provide technical and design assistance through two building science firms, Florida Home Energy and Resources Organization (FL HERO) and Calcs-Plus, and a designer that offers a line of stock plans designed specifically for energy efficiency, called Energy Smart Home Plans (ESHP). This report summarizes the findings of research on cost-effective high-performance whole-house solutions, focusing on real-world implementation and challenges and identifying effective solutions. The ensuing sections provide project background, profile each of the builders who participated in the program, and describe their houses’ construction characteristics, key challenges the builders encountered during the construction and transaction process); and present primary lessons learned to be applied to future projects. As a result of this technical assistance, 17 homes have been built featuring climate-appropriate efficient envelopes, ducts in conditioned space, and correctly sized and controlled heating, ventilation, and air-conditioning systems. In addition, most builders intend to integrate high-performance features into most or all their homes in the future. As these seven builders have demonstrated, affordable, high-performance homes are possible, but require attention to detail and flexibility in design to accommodate specific regional geographic or market-driven constraints that can increase cost. With better information regarding how energy-efficiency trade-offs or design choices affect overall home performance, builders can make informed decisions regarding home design and construction to minimize cost without sacrificing performance and energy savings.« less
50 CFR 253.11 - Guarantee policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., except: (1) Vessel construction. The Program will not finance this project cost. The Program will only refinance this project cost for an existing vessel whose previous construction cost has already been financed (or otherwise paid). Refinancing this project cost for a vessel that already exists is not...
Categorization of potential project cost overrun factors in construction industry
NASA Astrophysics Data System (ADS)
Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.
2018-04-01
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron L.; Curtis, Taylor L.; Johnson, Kurt
Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at futuremore » federal resource assessments and hydropower reform legislation.« less
Photovoltaic balance-of-system designs and costs at PVUSA
NASA Astrophysics Data System (ADS)
Reyes, A. B.; Jennings, C.
1995-05-01
This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.
APPLICATION OF THE 3D MODEL OF RAILWAY VIADUCTS TO COST ESTIMATION AND CONSTRUCTION
NASA Astrophysics Data System (ADS)
Fujisawa, Yasuo; Yabuki, Nobuyoshi; Igarashi, Zenichi; Yoshino, Hiroyuki
Three dimensional models of civil engineering structures are only partially used in either design or construction but not both. Research on integration of design, cost estimation and construction by 3Dmodels has not been heard in civil engineering domain yet. Using continuously a 3D product model of a structure from design to construction through estimation should improve the efficiency and decrease the occurrence of mistakes, hence enhancing the quality. In this research, we investigated the current practices of flow from design to construction, particularly focusing on cost estimation. Then, we identified advantages and issues on utilization of 3D design models to estimation and construction by applying 3D models to an actual railway construction project.
Hsueh, Ya-seng Arthur; Brando, Alex; Dunt, David; Anjou, Mitchell D; Boudville, Andrea; Taylor, Hugh
2013-12-01
To estimate the costs of the extra resources required to close the gap of vision between Indigenous and non-Indigenous Australians. Constructing comprehensive eye care pathways for Indigenous Australians with their related probabilities, to capture full eye care usage compared with current usage rate for cataract surgery, refractive error and diabetic retinopathy using the best available data. Urban and remote regions of Australia. The provision of eye care for cataract surgery, refractive error and diabetic retinopathy. Estimated cost needed for full access, estimated current spending and estimated extra cost required to close the gaps of cataract surgery, refractive error and diabetic retinopathy for Indigenous Australians. Total cost needed for full coverage of all three major eye conditions is $45.5 million per year in 2011 Australian dollars. Current annual spending is $17.4 million. Additional yearly cost required to close the gap of vision is $28 million. This includes extra-capped funds of $3 million from the Commonwealth Government and $2 million from the State and Territory Governments. Additional coordination costs per year are $13.3 million. Although available data are limited, this study has produced the first estimates that are indicative of the need for planning and provide equity in eye care. © 2013 The Authors. Australian Journal of Rural Health © National Rural Health Alliance Inc.
Estimating and bidding for the Space Station Processing Facility
NASA Technical Reports Server (NTRS)
Brown, Joseph A.
1993-01-01
This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 10 more ways the low bidder got low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.
48 CFR 236.271 - Cost-plus-fixed-fee contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...
23 CFR 635.205 - Finding of cost effectiveness.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Finding of cost effectiveness. 635.205 Section 635.205... CONSTRUCTION AND MAINTENANCE Force Account Construction § 635.205 Finding of cost effectiveness. (a) It may be found cost effective for a State transportation department or county to undertake a federally financed...
Development of a low cost high precision three-layer 3D artificial compound eye.
Zhang, Hao; Li, Lei; McCray, David L; Scheiding, Sebastian; Naples, Neil J; Gebhardt, Andreas; Risse, Stefan; Eberhardt, Ramona; Tünnermann, Andreas; Yi, Allen Y
2013-09-23
Artificial compound eyes are typically designed on planar substrates due to the limits of current imaging devices and available manufacturing processes. In this study, a high precision, low cost, three-layer 3D artificial compound eye consisting of a 3D microlens array, a freeform lens array, and a field lens array was constructed to mimic an apposition compound eye on a curved substrate. The freeform microlens array was manufactured on a curved substrate to alter incident light beams and steer their respective images onto a flat image plane. The optical design was performed using ZEMAX. The optical simulation shows that the artificial compound eye can form multiple images with aberrations below 11 μm; adequate for many imaging applications. Both the freeform lens array and the field lens array were manufactured using microinjection molding process to reduce cost. Aluminum mold inserts were diamond machined by the slow tool servo method. The performance of the compound eye was tested using a home-built optical setup. The images captured demonstrate that the proposed structures can successfully steer images from a curved surface onto a planar photoreceptor. Experimental results show that the compound eye in this research has a field of view of 87°. In addition, images formed by multiple channels were found to be evenly distributed on the flat photoreceptor. Additionally, overlapping views of the adjacent channels allow higher resolution images to be re-constructed from multiple 3D images taken simultaneously.
Safety cost management in construction companies: A proposal classification.
López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C
2016-06-16
Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.
ERIC Educational Resources Information Center
Sundstrand, Jacquelyn K.
2008-01-01
Academic libraries are turning to automated storage and retrieval systems (ASRS) as a long-term cost effective means of gaining additional space in their open stacks areas by removing lesser used books and other materials for storage and placement into ASRS bins. The new library building under construction at the University of Nevada-Reno will…
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
ERIC Educational Resources Information Center
Agron, Joe
2001-01-01
Presents comparative data on college and university residence hall construction projects, including construction costs, size, numbers of students, and cost per square foot. Also provides comparative housing cost data over the past decade and identifies types of amenities being added to dormitories. (GR)
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
Space construction base support requirements for environmental control and life support systems
NASA Technical Reports Server (NTRS)
Thiele, R. J.; Secord, T. C.; Murphy, G. L.
1977-01-01
A Space Station analysis study is being performed for NASA which identifies cost-effective Space Station options that can provide a space facility capable of performing space construction, space manufacturing, cosmological research, earth services, and other functions. A space construction base concept for the construction of large structures, such as those needed to implement satellite solar power for earth usage, will be used as a basis for discussing requirements that impact the design selection, level of integration, and operation of environmental control and life support systems (ECLSS). The space construction base configuration also provides a basic Space Station facility that can accommodate biological manufacturing modules, ultrapure glasses manufacturing modules, and modules for other services in a building-block fashion. Examples of special problems that could dictate hardware required to augment the basic ECLSS for autonomous modules will be highlighted. Additionally, overall intravehicular (IVA) and extravehicular (EVA) activities and requirements that could impact the basic station ECLSS degree of closure are discussed.
Mihajlović, Višnja; Vujić, Goran; Stanisavljević, Nemanja; Batinić, Bojan
2016-09-01
This paper outlines the approach that can assist decision makers to have first preliminary insights regarding costs of complying with requested European Union municipal waste management goals in transition and developing countries. Serbia, as a joining member of European Union, must confront itself with the challenges resulting from European Union waste management directives. Implementation of waste separation units and the construction of sanitary landfills is already in place in Serbia. However, new waste management practice will need additional transformation and will require implementation of waste treatment technologies for additional management of generated waste. Implementation of analyzed best available technology/techniques for waste treatment can support the country's effort in reaching the policy goals. However, the question here is how much will the implementation of additional waste treatments influence the overall waste management costs? Results of the scenario's financial viability show that composting and sanitary landfill are the most viable solutions regarding the costs, even under increasing discount rates. Although different discount rates influence the overall gate fees and net present values, the level of affordability for different scenarios remains the same. © The Author(s) 2016.
48 CFR 9904.417-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be added to the construction-in-progress account in recognition of the cost of money related to... should be added to the construction-in-progress account in recognition of the cost of money while under... the costs were incurred at a fairly uniform rate throughout the period. Because of the pattern of cost...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Specially Adapted Housing; Cost-of-Construction Index AGENCY: Department of Veterans Affairs. ACTION: Notice... SAH assistance annually based on a residential home cost-of-construction index. The Secretary uses the Turner Building Cost Index for this purpose. During the most recent calendar year for which the Turner...
Final environmental assessment: Sacramento Energy Service Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
The Sacramento Area Office (SAO) of the Western Area Power Administration (Western) needs to increase the security of operations, to eliminate overcrowding at the current leased location of the existing facilities, to provide for future growth, to improve efficiency, and to reduce operating costs. The proposed action is to construct an approximate 40,000-square foot building and adjacent parking lot with a Solar Powered Electric Vehicle Charging Station installed to promote use of energy efficient transportation. As funding becomes available and technology develops, additional innovative energy-efficient measures will be incorporated into the building. For example the proposed construction of the Solarmore » Powered Electric Vehicle Charging.« less
Laser penetration spike welding: a welding tool enabling novel process and design opportunities
NASA Astrophysics Data System (ADS)
Dijken, Durandus K.; Hoving, Willem; De Hosson, J. Th. M.
2002-06-01
A novel method for laser welding for sheet metal. is presented. This laser spike welding method is capable of bridging large gaps between sheet metal plates. Novel constructions can be designed and manufactured. Examples are light weight metal epoxy multi-layers and constructions having additional strength with respect to rigidity and impact resistance. Its capability to bridge large gaps allows higher dimensional tolerances in production. The required laser systems are commercially available and are easily implemented in existing production lines. The lasers are highly reliable, the resulting spike welds are quickly realized and the cost price per weld is very low.
Literature review of methods to determine road user costs in construction zones
DOT National Transportation Integrated Search
1997-01-01
As freeway construction increases with the need to expand, repair and maintain the existing infrastructure, the desire to quantify the inconvenience or delay costs to the user of the freeway undergoing construction has increased and become neccessary...
Hartman, Jorine E; Klooster, Karin; Groen, Henk; Ten Hacken, Nick H T; Slebos, Dirk-Jan
2018-03-25
Bronchoscopic lung volume reduction using endobronchial valves (EBV) is an effective new treatment option for severe emphysema patients without interlobar collateral ventilation. The objective of this study was to perform an economic evaluation including the costs and cost-effectiveness of EBV treatment compared with standard medical care (SoC) from the hospital perspective in the short term and long term. For the short-term evaluation, incremental cost-effectiveness ratios (ICER) were calculated based on the 6-month end point data from the STELVIO randomized trial. For the long-term evaluation, a Markov simulation model was constructed based on STELVIO and literature. The clinical outcome data were quality-adjusted life-years (QALY) based on the EuroQol5-Dimensions (EQ5D) questionnaire, the 6-min walking distance (6MWD) and the St George's Respiratory Questionnaire (SGRQ). The mean difference between the EBV group and controls was €16 721/patient. In the short-term (6 months), costs per additional QALY was €205 129, the ICER for 6MWD was €160 and for SGRQ was €1241. In the long term, the resulting cost-effectiveness ratios indicate additional costs of €39 000 per QALY gained with a 5-year time horizon and €21 500 per QALY gained at 10 years. In comparison, historical costs per additional QALY 1 year after the coil treatment are €738 400, 5 years after lung volume reduction surgery are €48 415 and 15 years after double-lung transplantation are €29 410. The positive clinical effects of EBV treatment are associated with increased costs compared with SoC. Our results suggest that the EBV treatment has a favourable cost-effectiveness profile, also when compared with other treatment modalities for this patient group. © 2018 Asian Pacific Society of Respirology.
Next-generation sequencing library construction on a surface.
Feng, Kuan; Costa, Justin; Edwards, Jeremy S
2018-05-30
Next-generation sequencing (NGS) has revolutionized almost all fields of biology, agriculture and medicine, and is widely utilized to analyse genetic variation. Over the past decade, the NGS pipeline has been steadily improved, and the entire process is currently relatively straightforward. However, NGS instrumentation still requires upfront library preparation, which can be a laborious process, requiring significant hands-on time. Herein, we present a simple but robust approach to streamline library preparation by utilizing surface bound transposases to construct DNA libraries directly on a flowcell surface. The surface bound transposases directly fragment genomic DNA while simultaneously attaching the library molecules to the flowcell. We sequenced and analysed a Drosophila genome library generated by this surface tagmentation approach, and we showed that our surface bound library quality was comparable to the quality of the library from a commercial kit. In addition to the time and cost savings, our approach does not require PCR amplification of the library, which eliminates potential problems associated with PCR duplicates. We described the first study to construct libraries directly on a flowcell. We believe our technique could be incorporated into the existing Illumina sequencing pipeline to simplify the workflow, reduce costs, and improve data quality.
Kohlmann, Sebastian; Gierk, Benjamin
2017-01-01
Background Although depression is common in patients with heart disease, screening for depression is much debated. DEPSCREEN-INFO showed that a patient-targeted feedback in addition to screening results in lower depression level six months after screening. The purpose of this analysis was to perform a cost-effectiveness analysis of DEPSCREEN-INFO. Methods Patients with coronary heart disease or arterial hypertension were included. Participants in both groups were screened for depression. Participants in the intervention group additionally received a patient-targeted feedback of their result and recommended treatment options. A cost-utility analysis using quality-adjusted life years (QALY) based on the EQ-5D was performed. The time horizon was 6 months. Resource utilization was assessed by a telephone interview. Multiple imputation using chained equations was used. Net-benefit regressions controlled for prognostic variables at baseline were performed to construct cost-effectiveness acceptability curves. Different sensitivity analyses were performed. Results 375 participants (intervention group: 155; control group: 220) were included at baseline. After 6 months, in the intervention group adjusted total costs were lower (-€2,098; SE: €1,717) and more QALY were gained (0.0067; SD: 0.0133); yet differences were not statistically significant. The probability of cost-effectiveness was around 80% independent of the willingness-to-pay (range: €0/QALY–€130,000/QALY). The results were robust. Conclusions A patient-targeted feedback in addition to depression screening in cardiology is cost-effective with a high probability. This underpins the use of the patient-targeted feedbacks and the PHQ-9 that are both freely available and easy to implement in routine care. PMID:28806775
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
NASA Technical Reports Server (NTRS)
Willis, P. B.; Baum, B.; White, R. A.
1978-01-01
The results of an investigation of solar module encapsulation systems applicable to the Low-Cost Solar Array Project 1986 cost and performance goals are presented. Six basic construction elements were identified and their specific uses in module construction defined. A uniform coating basis was established for each element. The survey results were also useful in revealing price ranges for classes of materials and estimating the cost allocation for each element within the encapsulating cost goal. The six construction elements were considered to be substrates, superstrates, pottants, adhesives, outer covers and back covers.
Workers' compensation costs among construction workers: a robust regression analysis.
Friedman, Lee S; Forst, Linda S
2009-11-01
Workers' compensation data are an important source for evaluating costs associated with construction injuries. We describe the characteristics of injured construction workers filing claims in Illinois between 2000 and 2005 and the factors associated with compensation costs using a robust regression model. In the final multivariable model, the cumulative percent temporary and permanent disability-measures of severity of injury-explained 38.7% of the variance of cost. Attorney costs explained only 0.3% of the variance of the dependent variable. The model used in this study clearly indicated that percent disability was the most important determinant of cost, although the method and uniformity of percent impairment allocation could be better elucidated. There is a need to integrate analytical methods that are suitable for skewed data when analyzing claim costs.
A Semantics-Based Approach to Construction Cost Estimating
ERIC Educational Resources Information Center
Niknam, Mehrdad
2015-01-01
A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1993-01-01
The primary objective of this report is to provide estimates of volumes and development costs of known nonassociated gas reserves in selected, potentially important supplier nations, using a standard set of costing algorithms and conventions. Estimates of undeveloped nonassociated gas reserves and the cost of drilling development wells, production equipment, gas processing facilities, and pipeline construction are made at the individual field level. A discounted cash-flow model of production, investment, and expenses is used to estimate the present value cost of developing each field on a per-thousand-cubic-foot (Mcf) basis. These gas resource cost estimates for individual accumulations (that is, fieldsmore » or groups of fields) then were aggregated into country-specific price-quantity curves. These curves represent the cost of developing and transporting natural gas to an export point suitable for tanker shipments or to a junction with a transmission line. The additional costs of LNG or methanol conversion are not included. A brief summary of the cost of conversion to methanol and transportation to the United States is contained in Appendix D: Implications of Gas Development Costs for Methanol Conversion.« less
Hybrid Residual Flexibility/Mass-Additive Method for Structural Dynamic Testing
NASA Technical Reports Server (NTRS)
Tinker, M. L.
2003-01-01
A large fixture was designed and constructed for modal vibration testing of International Space Station elements. This fixed-base test fixture, which weighs thousands of pounds and is anchored to a massive concrete floor, initially utilized spherical bearings and pendulum mechanisms to simulate Shuttle orbiter boundary constraints for launch of the hardware. Many difficulties were encountered during a checkout test of the common module prototype structure, mainly due to undesirable friction and excessive clearances in the test-article-to-fixture interface bearings. Measured mode shapes and frequencies were not representative of orbiter-constrained modes due to the friction and clearance effects in the bearings. As a result, a major redesign effort for the interface mechanisms was undertaken. The total cost of the fixture design, construction and checkout, and redesign was over $2 million. Because of the problems experienced with fixed-base testing, alternative free-suspension methods were studied, including the residual flexibility and mass-additive approaches. Free-suspension structural dynamics test methods utilize soft elastic bungee cords and overhead frame suspension systems that are less complex and much less expensive than fixed-base systems. The cost of free-suspension fixturing is on the order of tens of thousands of dollars as opposed to millions, for large fixed-base fixturing. In addition, free-suspension test configurations are portable, allowing modal tests to be done at sites without modal test facilities. For example, a mass-additive modal test of the ASTRO-1 Shuttle payload was done at the Kennedy Space Center launch site. In this Technical Memorandum, the mass-additive and residual flexibility test methods are described in detail. A discussion of a hybrid approach that combines the best characteristics of each method follows and is the focus of the study.
Construction in Occupied Spaces
NASA Astrophysics Data System (ADS)
Ward, Andrew E.; Azhar, Salman; Khalfan, Malik
2017-06-01
Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.
Pilot production system cost/benefit analysis: Digital document storage project
NASA Technical Reports Server (NTRS)
1989-01-01
The Digital Document Storage (DDS)/Pilot Production System (PPS) will provide cost effective electronic document storage, retrieval, hard copy reproduction, and remote access for users of NASA Technical Reports. The DDS/PPS will result in major benefits, such as improved document reproduction quality within a shorter time frame than is currently possible. In addition, the DDS/PPS will provide an important strategic value through the construction of a digital document archive. It is highly recommended that NASA proceed with the DDS Prototype System and a rapid prototyping development methodology in order to validate recent working assumptions upon which the success of the DDS/PPS is dependent.
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
NASA Astrophysics Data System (ADS)
Ferkinhoff, Carl
2014-07-01
There have been several exciting developments in the technologies commonly used n in the hardware hacking community. Advances in low cost additive-manufacturing processes (i.e. 3D-printers) and the development of openhardware projects, which have produced inexpensive and easily programmable micro-controllers and micro-computers (i.e. Arduino and Raspberry Pi) have opened a new door for individuals seeking to make their own devices. Here we describe the potential for these technologies to reduce costs in construction and development of submillimeter/millimeter astronomical instrumentation. Specifically we have begun a program to measure the optical properties of the custom plastics used in 3D-printers as well as the printer accuracy and resolution to assess the feasibility of directly printing sub- /millimeter transmissive optics. We will also discuss low cost designs for cryogenic temperature measurement and control utilizing Arduino and Raspberry Pi.
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sale which includes specified road construction with total estimated construction costs of $50,000 or more, the advertisement shall also include: (1) The total estimated construction cost of the permanent roads. (2) A statement extending to small business concerns qualified for preferential bidding on timber...
California-Wyoming Grid Integration Study: Phase 1 -- Economic Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corbus, D.; Hurlbut, D.; Schwabe, P.
This study presents a comparative analysis of two different renewable energy options for the California energy market between 2017 and 2020: 12,000 GWh per year from new California in-state renewable energy resources; and 12,000 GWh per year from Wyoming wind delivered to the California marketplace. Either option would add to the California resources already existing or under construction, theoretically providing the last measure of power needed to meet (or to slightly exceed) the state's 33% renewable portfolio standard. Both options have discretely measurable differences in transmission costs, capital costs (due to the enabling of different generation portfolios), capacity values, andmore » production costs. The purpose of this study is to compare and contrast the two different options to provide additional insight for future planning.« less
Feasibility Studies of Palm Oil Mill Waste Aggregates for the Construction Industry.
Kanadasan, Jegathish; Fauzi, Auni Filzah Ahmad; Razak, Hashim Abdul; Selliah, Paramananthan; Subramaniam, Vijaya; Yusoff, Sumiani
2015-09-22
The agricultural industry in Malaysia has grown rapidly over the years. Palm oil clinker (POC) is a byproduct obtained from the palm oil industry. Its lightweight properties allows for its utilization as an aggregate, while in powder form as a filler material in concrete. POC specimens obtained throughout each state in Malaysia were investigated to evaluate the physical, chemical, and microstructure characteristics. Variations between each state were determined and their possible contributory factors were assessed. POC were incorporated as a replacement material for aggregates and their engineering characteristics were ascertained. Almost 7% of density was reduced with the introduction of POC as aggregates. A sustainability assessment was made through greenhouse gas emission (GHG) and cost factor analyses to determine the contribution of the addition of POC to the construction industry. Addition of POC helps to lower the GHG emission by 9.6% compared to control specimens. By channeling this waste into the construction industry, an efficient waste-management system can be promoted; thus, creating a cleaner environment. This study is also expected to offer some guides and directions for upcoming research works on the incorporation of POC.
Design and installation of a next generation pilot scale fermentation system.
Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P
2003-01-01
Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
NASA Astrophysics Data System (ADS)
Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad
2018-04-01
Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2012-03-02
challenging ship redesign as well as a new power and cooling architecture coupled with the challenges to construct such a dense ship, will make...costs. Our prior work has shown that construction of lead ships is challenging , the risk of cost growth is high, and having sufficient construction...not include a thorough trade-off analysis that would compare the relative costs and benefits of different solutions under consideration or provide
NASA Technical Reports Server (NTRS)
1977-01-01
Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 2 2014-04-01 2014-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false At the end of a self-determination construction contract... SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.134 At the end of a self-determination construction contract, what happens to savings on a cost...
New Opportunities of Low-Cost Photogrammetry for Culture Heritage Preservation
NASA Astrophysics Data System (ADS)
Shults, R.
2017-05-01
In the paper, the questions of using the technologies of low-cost photogrammetry in combination with the additional capabilities of modern smartphones are considered. The research was carried out on the example of documenting the historical construction of the II World War - the Kiev Fortified Region. Brief historical information about the object of research is given. The possibilities of using modern smartphones as measuring instruments are considered. To get high-quality results, the camera of the smartphone was calibrated. The calibration results were used in the future to perform 3D modeling of defense facilities. Photographing of three defense structures in a different state: destroyed, partially destroyed and operating was carried out. Based on the results of photography using code targets, 3D object models were constructed. To verify the accuracy of the 3D modelling, control measurements of the lines between the code targets at the objects were performed. The obtained results are satisfying, and the technology considered in the paper can be recommended for use in performing archaeological and historical studies.
Investigating Approaches to Achieve Modularity Benefits in the Acquisition Ecosystem
2017-06-09
actions and that of others, and how the assessments are affected by their actions. • Case study approach based on best practices, tacit knowledge... case study -derived exemplars, and items requiring further research on identifying additional enablers and useful knowledge constructs. All of these... case studies that document the effective use of modularity in system design for some or all of innovation, competition, cost, technology and
Mejía, Aurelio; Senior, Juan Manuel; Ceballos, Mateo; Atehortúa, Sara; Toro, Juan Manuel; Saldarriaga, Clara; Mejía, María Elena; Ramírez, Carolina
2015-01-01
Acute coronary syndrome is one of the most frequent medical emergencies in developing countries. To determine, from the perspective of the Colombian health system, the cost-effectiveness of ticagrelor compared to clopidogrel for the treatment of patients with acute coronary syndrome. We conducted a cost-effectiveness analysis from the perspective of the Colombian health system comparing ticagrelor and clopidogrel for the treatment of patients with acute coronary syndrome. To estimate the expected costs and outcomes, a Markov model was constructed in which patients could remain stable without experiencing new cardiovascular events, suffer from a new event, or die. For the baseline case, a 10-year time horizon and a discount ratio of 3% for costs and benefits were adopted. The transition probabilities were extracted from the PLATO (Platelet Inhibition and Patient Outcomes) clinical trial. Vital statistics were drawn from the Departmento Administrativo Nacional de Estadística (DANE) and additional information from Colombian patients included in the Access registry. To identify and measure resource use, a standard case was built by consulting guidelines and protocols. Unit costs were obtained from Colombian rate lists. A probabilistic sensitivity analysis was conducted in which costs were represented by a triangular distribution, and the effectiveness through a beta distribution. In the base case, the additional cost per quality-adjusted life-year gained with ticagrelor was COP$ 28,411,503. The results were sensitive to changes in the time horizon and the unit cost of clopidogrel. For a willingness-to-pay equivalent to three times the Colombian per capita gross domestic product, the probability of ticagrelor being cost-effective was 75%. Ticagrelor is a cost-effective strategy for the treatment of patients with acute coronary syndrome in Colombia.
The cost-effectiveness of IVF in the UK: a comparison of three gonadotrophin treatments.
Sykes, D; Out, H J; Palmer, S J; van Loon, J
2001-12-01
The objective of this study was to evaluate the cost-effectiveness of women undergoing IVF treatment with recombinant FSH (rFSH) in comparison with highly purified urinary FSH (uFSH-HP) and human menopausal gonadotrophins (HMG). A decision-analytic model was used to estimate cost-effectiveness ratios for 'the average cost per ongoing pregnancy' and 'incremental cost per additional pregnancy' for women entering into IVF treatment for a maximum of three cycles. The model was constructed based on a previously published large prospective randomized clinical trial comparing rFSH and uFSH-HP. Where necessary, these data were augmented with a combination of expert opinion, evidence from the literature and observational data relating to the management and cost of IVF treatment in the UK. The cost of rFSH, uFSH-HP and HMG were obtained from National Health Service list prices in the UK. The model predicted a cumulative pregnancy rate after three cycles of 57.1% for rFSH and 44.4% for both uFSH-HP and HMG. The cost of IVF treatment was 5135 pounds sterling for rFSH, 4806 pounds sterling for uFSH-HP and 4202 pounds sterling for HMG. When assessed in association with outcomes, the average cost per ongoing pregnancy was more favourable with rFSH (8992 pounds sterling) than with either uFSH-HP (10 834 pounds sterling) or HMG (9472 pounds sterling). The incremental cost per additional pregnancy was 2583 pounds sterling using rFSH instead of uFSH-HP and 7321 pounds sterling using rFSH instead of HMG. These results were robust to changes in the baseline assumptions of the model. rFSH is a cost-effective treatment strategy in ovulation induction prior to IVF.
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, whichmore » were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.« less
Maglev guideway cost and construction schedule assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plotkin, D.; Kim, S.
1997-05-01
A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less
Henry, Thea L; De Brouwer, Bonnie F E; Van Keep, Marjolijn M L; Blankestijn, Peter J; Bots, Michiel L; Koffijberg, Hendrik
2015-01-01
Safety and efficacy data for catheter-based renal denervation (RDN) in the treatment of resistant hypertension have been used to estimate the cost-effectiveness of this approach. However, there are no Dutch-specific analyses. This study examined the cost-effectiveness of RDN from the perspective of the healthcare payer in The Netherlands. A previously constructed Markov state-transition model was adapted and updated with costs and utilities relevant to the Dutch setting. The cost-effectiveness of RDN was compared with standard of care (SoC) for patients with resistant hypertension. The efficacy of RDN treatment was modeled as a reduction in the risk of cardiovascular events associated with a lower systolic blood pressure (SBP). Treatment with RDN compared to SoC gave an incremental quality-adjusted life year (QALY) gain of 0.89 at an additional cost of €1315 over a patient's lifetime, resulting in a base case incremental cost-effectiveness ratio (ICER) of €1474. Deterministic and probabilistic sensitivity analyses (PSA) showed that treatment with RDN therapy was cost-effective at conventional willingness-to-pay thresholds (€10,000-80,000/QALY). RDN is a cost-effective intervention for patients with resistant hypertension in The Netherlands.
NASA Astrophysics Data System (ADS)
Yamasaki, Hayata; Soeda, Akihito; Murao, Mio
2017-09-01
We introduce and analyze graph-associated entanglement cost, a generalization of the entanglement cost of quantum states to multipartite settings. We identify a necessary and sufficient condition for any multipartite entangled state to be constructible when quantum communication between the multiple parties is restricted to a quantum network represented by a tree. The condition for exact state construction is expressed in terms of the Schmidt ranks of the state defined with respect to edges of the tree. We also study approximate state construction and provide a second-order asymptotic analysis.
The 1988 Inland Waterway Review
1988-11-01
Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information
Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
2000-06-30
This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project ismore » expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality, traffic, noise, and ecological resources, that could result from construction and operation of the proposed project. Key findings include that maximum modeled increases in ground-level concentrations of SO{sub 2} nitrogen dioxide (NO{sub 2}), and particulate matter (for the proposed project alone or in conjunction with the related action) would always be less than 10% of their corresponding standards for increases in pollutants. For potential cumulative air quality impacts, results of modeling regional sources and the proposed project indicate that the maximum 24-hour average SO{sub 2} concentration would closely approach (i.e., 97%) but not exceed the corresponding Florida standard. After the Unit 1 repowering, results indicate that the maximum 24-hour average SO{sub 2} concentration would be 91% of the Florida standard. Concentrations for other averaging periods and pollutants would be lower percentages of their standards. Regarding toxic air pollutants from the proposed project, the maximum annual cancer risk to a member of the public would be approximately 1 in 1 million; given the conservative assumptions in the estimate, the risk would probably be less. With regard to threatened and endangered species, impacts to manatees, gopher tortoises, and other species would be negligible or non-existent. Construction-induced traffic would result in noticeable congestion. In the unlikely event that all coal were transported by rail, up to 3 additional trains per week would exacerbate impacts associated with noise, vibration, and blocked roads at on-grade rail crossings. Additional train traffic could be minimized by relying more heavily on barges and ships for coal transport, which is likely to be a more economic fuel delivery mode. During construction of the proposed project, noise levels would increase from the current operational levels. Except possibly during steam blowouts and possibly during operation of equipment used to construct a nearby segment of a conveyor, construction noise should not appreciably affect the background noise of nearby residences or exceed local noise limitations. The preferred alternative for management of the combustion ash would be to sell it as a by-product to offsite customers. If more than approximately 70% of the ash could be sold over the 30-year lifetime of Northside Generating Station, the 40-acre storage site would be sufficient for complete containment.« less
Groeneveld, Iris F; Proper, Karin I; van der Beek, Allard J; van Duivenbooden, Cor; van Mechelen, Willem
2008-01-01
Background Of all workers in Dutch construction industry, 20% has an elevated risk of cardiovascular disease (CVD). A major risk factor for CVD risk is an unhealthy lifestyle. The aim of our study is to design a lifestyle intervention for construction workers with an elevated CVD risk, and to evaluate its (cost-) effectiveness. Methods/Design In a RCT, 692 participants will be randomised to either the control or the intervention group. The control group will receive usual care. For the intervention group, a lifestyle intervention has been designed based on interviews and current literature. The intervention will last 6 months and will comprise 3 face-to-face and 4 telephone contacts, consisting of individual counselling aimed at increasing daily physical activity (PA) and improving dietary behaviour, and/or smoking cessation. Counselling will take place at the Occupational Health Service (OHS), and will be done according to motivational interviewing (MI). Additional written information about healthy lifestyle will also be provided to those in the intervention group. At baseline, after 6 and after 12 months, measurements will take place. Primary outcome variables will be the lifestyle behaviours of concern, i.e. daily PA, dietary intake, and smoking status. Secondary outcome variables will be body mass index (BMI), systolic and diastolic blood pressure, total and HDL blood cholesterol, Hba1c and cardio-respiratory fitness (CRF). Sickness absenteeism and cost-effectiveness will be assessed as well. Multilevel analysis will be performed to compare all outcome measures between the intervention group and the control group. Discussion By improving lifestyle, CVD risk may be lowered, yielding benefits for both employee and employer. If proven effective, this lifestyle intervention will be implemented on a larger scale within the Occupational Health Services in construction industry. Trial registration Current Controlled Trials ISRCTN60545588 PMID:18173844
Use Hardwoods for Building Components
Glenn A. Cooper; William W. Rice
1968-01-01
Describes a system for prefabricating structural units from hardwoods for use in floors, roofs, and walls of a-frame or post-and-beam type construction. The interior face of the unit is decorative paneling; the exterior face is sheathing. Use of the system could reduce prefabricated house construction costs compared to conventional construction costs.
Preservation treatment for wood bridge application
Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf
2009-01-01
Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...
Cost viability of 3D printed house in UK
NASA Astrophysics Data System (ADS)
Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.
2018-03-01
UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.
Ertefaie, Ashkan; Lucy, Xi; Lynch, Kevin G.; McKay, James R.; Oslin, David; Almirall, Daniel
2016-01-01
Aims To demonstrate how Q-learning, a novel data analysis method, can be used with data from a sequential, multiple assignment, randomized trial (SMART) to construct empirically an adaptive treatment strategy (ATS) that is more tailored than the ATSs already embedded in a SMART. Method We use Q-learning with data from the Extending Treatment Effectiveness of Naltrexone (ExTENd) SMART (N=250) to construct empirically an ATS employing naltrexone, behavioral intervention, and telephone disease management to reduce alcohol consumption over 24 weeks in alcohol dependent individuals. Results Q-learning helped to identify a subset of individuals who, despite showing early signs of response to naltrexone, require additional treatment to maintain progress. Conclusions Q-learning can inform the development of more cost-effective, stepped-care strategies for treating substance use disorders. PMID:28029718
Magnetic induction tomography of objects for security applications
NASA Astrophysics Data System (ADS)
Ward, Rob; Joseph, Max; Langley, Abbi; Taylor, Stuart; Watson, Joe C.
2017-10-01
A coil array imaging system has been further developed from previous investigations, focusing on designing its application for fast screening of small bags or parcels, with a view to the production of a compact instrument for security applications. In addition to reducing image acquisition times, work was directed toward exploring potential cost effective manufacturing routes. Based on magnetic induction tomography and eddy-current principles, the instrument captured images of conductive targets using a lock-in amplifier, individually multiplexing signals between a primary driver coil and a 20 by 21 imaging array of secondary passive coils constructed using a reproducible multiple tile design. The design was based on additive manufacturing techniques and provided 2 orthogonal imaging planes with an ability to reconstruct images in less than 10 seconds. An assessment of one of the imaging planes is presented. This technique potentially provides a cost effective threat evaluation technique that may compliment conventional radiographic approaches.
Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sawab, Jamshaid; Lim, Ing; Mo, Yi-Lung
Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments andmore » mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.« less
Gerwin, Philip M; Norinsky, Rada M; Tolwani, Ravi J
2018-03-01
Laboratory animal programs and core laboratories often set service rates based on cost estimates. However, actual costs may be unknown, and service rates may not reflect the actual cost of services. Accurately evaluating the actual costs of services can be challenging and time-consuming. We used a time-driven activity-based costing (ABC) model to determine the cost of services provided by a resource laboratory at our institution. The time-driven approach is a more efficient approach to calculating costs than using a traditional ABC model. We calculated only 2 parameters: the time required to perform an activity and the unit cost of the activity based on employee cost. This method allowed us to rapidly and accurately calculate the actual cost of services provided, including microinjection of a DNA construct, microinjection of embryonic stem cells, embryo transfer, and in vitro fertilization. We successfully implemented a time-driven ABC model to evaluate the cost of these services and the capacity of labor used to deliver them. We determined how actual costs compared with current service rates. In addition, we determined that the labor supplied to conduct all services (10,645 min/wk) exceeded the practical labor capacity (8400 min/wk), indicating that the laboratory team was highly efficient and that additional labor capacity was needed to prevent overloading of the current team. Importantly, this time-driven ABC approach allowed us to establish a baseline model that can easily be updated to reflect operational changes or changes in labor costs. We demonstrated that a time-driven ABC model is a powerful management tool that can be applied to other core facilities as well as to entire animal programs, providing valuable information that can be used to set rates based on the actual cost of services and to improve operating efficiency.
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
48 CFR 1845.7101-3 - Unit acquisition cost.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...
Illumina Unamplified Indexed Library Construction: An Automated Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang
Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.
Reduction from cost-sensitive ordinal ranking to weighted binary classification.
Lin, Hsuan-Tien; Li, Ling
2012-05-01
We present a reduction framework from ordinal ranking to binary classification. The framework consists of three steps: extracting extended examples from the original examples, learning a binary classifier on the extended examples with any binary classification algorithm, and constructing a ranker from the binary classifier. Based on the framework, we show that a weighted 0/1 loss of the binary classifier upper-bounds the mislabeling cost of the ranker, both error-wise and regret-wise. Our framework allows not only the design of good ordinal ranking algorithms based on well-tuned binary classification approaches, but also the derivation of new generalization bounds for ordinal ranking from known bounds for binary classification. In addition, our framework unifies many existing ordinal ranking algorithms, such as perceptron ranking and support vector ordinal regression. When compared empirically on benchmark data sets, some of our newly designed algorithms enjoy advantages in terms of both training speed and generalization performance over existing algorithms. In addition, the newly designed algorithms lead to better cost-sensitive ordinal ranking performance, as well as improved listwise ranking performance.
Wan, Xiao Min; Peng, Liu Bao; Ma, Jin An; Li, Yuan Jian
2017-07-15
Nivolumab is a new standard of care for patients with metastatic renal cell carcinoma (mRCC) and provides an overall survival benefit of 5.40 months in comparison with everolimus. This study evaluated the cost-effectiveness of nivolumab for the second-line treatment of mRCC from the perspective of US payers and identified the range of drug costs for which the addition of nivolumab to standard therapy could be considered cost-effective from a Chinese perspective. A partitioned survival model was constructed to estimate lifetime costs, life-years, and quality-adjusted life-years (QALYs). Costs were estimated for the US and Chinese health care systems. One-way and probabilistic sensitivity analyses were performed. Nivolumab provided an additional 0.29 QALYs at a cost of $151,676/QALY in the United States. The probabilistic sensitivity analysis showed that at a willingness-to-pay threshold of $100,000/QALY, at the current cost of nivolumab, the chance of nivolumab being cost-effective was 3.10%. For China, when nivolumab cost less than $7.90 or $9.70/mg, there was a nearly 90% likelihood that the incremental cost-effectiveness ratio for nivolumab would be less than $22,785 or $48,838/QALY, respectively. For the United States, nivolumab is unlikely to be a high-value treatment for mRCC at the current price, and a price reduction appears to be justified. In China, value-based prices for nivolumab are $7.90 and $9.70/mg for the country and Beijing City, respectively. This study could and should inform the multilateral drug-price negotiations in China that may be upcoming for nivolumab. Cancer 2017;123:2634-41. © 2017 American Cancer Society. © 2017 American Cancer Society.
Ding, Yao; Thompson, John D; Kobrynski, Lisa; Ojodu, Jelili; Zarbalian, Guisou; Grosse, Scott D
2016-05-01
To evaluate the expected cost-effectiveness and net benefit of the recent implementation of newborn screening (NBS) for severe combined immunodeficiency (SCID) in Washington State. We constructed a decision analysis model to estimate the costs and benefits of NBS in an annual birth cohort of 86 600 infants based on projections of avoided infant deaths. Point estimates and ranges for input variables, including the birth prevalence of SCID, proportion detected asymptomatically without screening through family history, screening test characteristics, survival rates, and costs of screening, diagnosis, and treatment were derived from published estimates, expert opinion, and the Washington NBS program. We estimated treatment costs stratified by age of identification and SCID type (with or without adenosine deaminase deficiency). Economic benefit was estimated using values of $4.2 and $9.0 million per death averted. We performed sensitivity analyses to evaluate the influence of key variables on the incremental cost-effectiveness ratio (ICER) of net direct cost per life-year saved. Our model predicts an additional 1.19 newborn infants with SCID detected preclinically through screening, in addition to those who would have been detected early through family history, and 0.40 deaths averted annually. Our base-case model suggests an ICER of $35 311 per life-year saved, and a benefit-cost ratio of either 5.31 or 2.71. Sensitivity analyses found ICER values <$100 000 and positive net benefit for plausible assumptions on all variables. Our model suggests that NBS for SCID in Washington is likely to be cost-effective and to show positive net economic benefit. Published by Elsevier Inc.
Coronado, Andrea C; Zaric, Gregory S; Martin, Janet; Malvankar-Mehta, Monali; Si, Francie F; Hodge, William G
2016-01-01
Diabetic eye complications are the leading cause of visual loss among working-aged people. Pharmacy-based teleophthalmology has emerged as a possible alternative to in-person examination that may facilitate compliance with evidence-based recommendations and reduce barriers to specialized eye care. The objective of this study was to estimate the cost-effectiveness of mobile teleophthalmology screening compared with in-person examination (primary care) for the diabetic population residing in semiurban areas of southwestern Ontario. A decision tree was constructed to compare in-person examination (comparator program) versus pharmacy-based teleophthalmology (intervention program). The economic model was designed to identify patients with more than minimal diabetic retinopathy, manifested by at least 1 microaneurysm at examination (modified Airlie House classification grade of ≥ 20). Cost-effectiveness was assessed as cost per case detected (true-positive result) and cost per case correctly diagnosed (including true-positive and true-negative results). The cost per case detected was $510 with in-person examination and $478 with teleophthalmology, and the cost per case correctly diagnosed was $107 and $102 respectively. The incremental cost-effectiveness ratio was $314 per additional case detected and $73 per additional case correctly diagnosed. Use of pharmacologic dilation and health care specialists' fees were the most important cost drivers. The study showed that a compound teleophthalmology program in a semiurban community would be more effective but more costly than in-person examination. The findings raise the question of whether the benefits of pharmacy-based teleophthalmology in semiurban areas, where in-person examination is still available, are equivalent to those observed in remote communities. Further study is needed to investigate the impact of this program on the prevention of severe vision loss and quality of life in a semiurban setting.
Cost-effectiveness of prenatal screening strategies for congenital heart disease.
Pinto, N M; Nelson, R; Puchalski, M; Metz, T D; Smith, K J
2014-07-01
The economic implications of strategies to improve prenatal screening for congenital heart disease (CHD) in low-risk mothers have not been explored. The aim was to perform a cost-effectiveness analysis of different screening methods. We constructed a decision analytic model of CHD prenatal screening strategies (four-chamber screen (4C), 4C + outflow, nuchal translucency (NT) or fetal echocardiography) populated with probabilities from the literature. The model included whether initial screens were interpreted by a maternal-fetal medicine (MFM) specialist and different referral strategies if they were read by a non-MFM specialist. The primary outcome was the incremental cost per defect detected. Costs were obtained from Medicare National Fee estimates. A probabilistic sensitivity analysis was undertaken on model variables commensurate with their degree of uncertainty. In base-case analysis, 4C + outflow referred to an MFM specialist was the least costly strategy per defect detected. The 4C screen and the NT screen were dominated by other strategies (i.e. were more costly and less effective). Fetal echocardiography was the most effective, but most costly. On simulation of 10 000 low-risk pregnancies, 4C + outflow screen referred to an MFM specialist remained the least costly per defect detected. For an additional $580 per defect detected, referral to cardiology after a 4C + outflow was the most cost-effective for the majority of iterations, increasing CHD detection by 13 percentage points. The addition of examination of the outflow tracts to second-trimester ultrasound increases detection of CHD in the most cost-effective manner. Strategies to improve outflow-tract imaging and to refer with the most efficiency may be the best way to improve detection at a population level. Copyright © 2013 ISUOG. Published by John Wiley & Sons Ltd.
Papercrete brick as an alternate building material to control Environmental Pollution
NASA Astrophysics Data System (ADS)
Sudarsan, J. S.; Ramesh, S.; Jothilingam, M.; Ramasamy, Vishalatchi; Rajan, Rajitha J.
2017-07-01
Utilization of concrete in the construction industry is increasing day by day. The increasing demand for concrete in the future is the major issue, for which an alternate option is to find out at a reduced or no additional cost and to reduce the environmental impact due to increase of cement industries that are important ingredient to economic development. It turns out urgent to find out alternate for the partial replacement of concrete and cement, as natural sources of aggregates are becoming exhausted. As large quantity of paper waste is generated from different countries all over the world which causes serious environmental problems, So in this present study abandoned paper waste was used as a partial replacement material in concrete,. Study indicates that 80% of the construction cost of a building was contributed by building material and still millions of people in developing countries like India are not able to afford the cost of construction of house. This study is based on potential use of light weight composite brick as a building material and potential use of paper waste for producing at low-cost. Experimental investigation was carried out to analyse optimization of mix for papercrete bricks depending upon the water absorption, compressive strength and unit weight. Papercrete bricks were prepared out of waste paper, and quarry dust with partial replacement of cement by another industrial by-product Fly Ash in varying proportions of 25%, 40% and 55%. The properties like mechanical strength, standard quality comparisons with the conventional bricks through standard tests like hardness, soundness, fire resistance and Cost-Benefit Analysis were performed and studied. The specimens of dimension 230mm x 110mm x 80mm were subjected to 7 Days and 28 days air curing and sun drying before tests were performed on them. Based on the study it was found that for non-load bearing walls papercrete bricks are best suited.
ERIC Educational Resources Information Center
Kreider, Beth
1997-01-01
Discusses the benefits of dome architecture for a community's middle- and high-school multi-purpose facility. The dome construction is revealed as being cost effective in construction and in maintenance and energy costs. (GR)
Shell Structure Water Cellar’s Rapid Construct Technology
NASA Astrophysics Data System (ADS)
Xian Zhuang, Wen; Qing Yin, De; Chen, Shu Fa
2018-05-01
Tradition concrete water cellar’s problems, such as high cost, long construction term, easy to crack, are pointed out. A new construct method, and it’s matching airbag mould, of constructing concrete shell structure water cellars, are introduced. Combine with full-scale verifying cellar’s construct test, full-load water storage test, analyzed the technology in terms of construction term, cost, crack resistance, air bag pressure etc. It is believed that this new technology can successfully solve the problems that tradition technology has, and it will have a good prospect in rainfall resources utilization.
Characteristics of worker accidents on NYSDOT construction projects.
Mohan, Satish; Zech, Wesley C
2005-01-01
This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehos, Mark; Turchi, Craig; Jorgensen, Jennie
2016-03-01
Since the SunShot Vision Study (DOE 2012) was published, global deployment of concentrating solar power (CSP) has increased threefold to nearly 4,500 MW, with a similar threefold increase in operational capacity to 1,650 MW within the United States. Growth in U.S. CSP capacity has primarily been driven by policy support at the state and federal levels. State-driven renewable portfolio standards (RPSs), combined with a 30% federal investment tax credit (ITC) and federal loan guarantees, provided the opportunity for CSP developers to kick-start construction of CSP plants throughout the Southwest. Figure ES-1 demonstrates that deployment and private- and public-sector research andmore » development have led to dramatic cost reductions that have placed CSP well on the path to reaching the U.S. Department of Energy’s SunShot Initiative goal of 6 cents/kWh by 2020. In comparing the estimated capital costs from the SunShot Vision Study and the current analysis, we find that parabolic trough solar-field costs have fallen more rapidly than predicted, although the drop in solar-field costs was offset by the additional costs of moving from a wet-cooled power block in 2010 to a more expensive dry-cooled power block in 2015. The predicted 2015 decline in tower costs was in line with expectations, primarily driven by reduced heliostat costs. Figure ES-1 shows the reduction in levelized cost of electricity (LCOE) for both parabolic trough and tower systems, in addition to the projected 2020 SunShot target.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2012 CFR
2012-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2010 CFR
2010-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Code of Federal Regulations, 2011 CFR
2011-07-01
... appropriate en route travel time. [FTR Amdt. 70, 63 FR 15971, Apr. 1, 1998. Redesignated by FTR Amdt. 108, 67... cost and constructive cost when an employee interrupts a travel assignment because of an incapacitating illness or injury? 301-70.506 Section 301-70.506 Public Contracts and Property Management Federal Travel...
Natural Cellulose Nanofibers As Sustainable Enhancers in Construction Cement
Jiao, Li; Su, Ming; Chen, Liao; Wang, Yuangang; Zhu, Hongli; Dai, Hongqi
2016-01-01
Cement is one of the mostly used construction materials due to its high durability and low cost, but it suffers from brittle fracture and facile crack initiation. This article describes the use of naturally-derived renewable cellulose nanofibers (CNFs) to reinforce cement. The effects of CNFs on the mechanical properties, degree of hydration (DOH), and microstructure of cement pastes have been studied. It is found that an addition of 0.15% by weight of CNFs leads to a 15% and 20% increase in the flexural and compressive strengths of cement paste. The enhancement in mechanical strength is attributed to high DOH and dense microstructure of cement pastes after adding CNFs. PMID:28005917
Good feeling of living in the earth
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolf, R.
1978-12-01
Underground houses combine energy savings and a comfortable lifestyle that leaves more land undisturbed and works with rather than against nature. Soil moderates and delays temperature fluctuations, leaving the heating system with a steady temperature that is much more efficient than the best insulated above-ground building. The combination of passive solar heating and underground construction suggests the possibility of an entirely new direction for future housing. Passive solar heating is appropriate because of the soil shield and the thermal mass provided by reinforced concrete. Both construction and operating costs are lower than conventional housing. Three styles: bermed, below grade, andmore » dug-in are available. Several sources of additional information are listed.« less
1994-06-07
023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to
NASA Astrophysics Data System (ADS)
González, M.; Montaño, M.; Hoyo, C.
2017-01-01
We have constructed a low cost fluorescence detector model to determine the presence of some heavy metals in an aqueous medium. In particular, we focus on metals which cause public health problems in our country. We did the first tests with standard samples of Hg (II). The innovative features of this instrument are its small dimensions (9 dm3) and the low cost of materials used in its construction.
Liu, Derong; Wang, Ding; Wang, Fei-Yue; Li, Hongliang; Yang, Xiong
2014-12-01
In this paper, the infinite horizon optimal robust guaranteed cost control of continuous-time uncertain nonlinear systems is investigated using neural-network-based online solution of Hamilton-Jacobi-Bellman (HJB) equation. By establishing an appropriate bounded function and defining a modified cost function, the optimal robust guaranteed cost control problem is transformed into an optimal control problem. It can be observed that the optimal cost function of the nominal system is nothing but the optimal guaranteed cost of the original uncertain system. A critic neural network is constructed to facilitate the solution of the modified HJB equation corresponding to the nominal system. More importantly, an additional stabilizing term is introduced for helping to verify the stability, which reinforces the updating process of the weight vector and reduces the requirement of an initial stabilizing control. The uniform ultimate boundedness of the closed-loop system is analyzed by using the Lyapunov approach as well. Two simulation examples are provided to verify the effectiveness of the present control approach.
An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)
2013-03-01
Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research
Theologis, Alexander A; Miller, Liane; Callahan, Matt; Lau, Darryl; Zygourakis, Corinna; Scheer, Justin K; Burch, Shane; Pekmezci, Murat; Chou, Dean; Tay, Bobby; Mummaneni, Praveen; Berven, Sigurd; Deviren, Vedat; Ames, Christopher P
2016-08-15
Retrospective cohort analysis. To evaluate the economic impact of revision surgery for proximal junctional failures (PJF) after thoracolumbar fusions for adult spinal deformity (ASD). PJF after fusions for ASD is a major cause of disability. Although clinical sequelae are described, PJF-revision operation costs are incompletely defined. Consecutive adults who underwent thoracolumbar fusions for ASD (August, 2003 to January, 2013) were evaluated. Inclusion criteria include construct from pelvis to L2 or above and minimum 6 months follow-up after the index ASD operation. Direct costs (surgical supplies/implants, room/care, pharmacy, services) were identified from medical billing data and calculated for index ASD operations and subsequent surgeries for PJF. Not included in direct cost data were indirect costs, charges, surgeon fees, or revision operations for indications other than PJF (i.e., pseudarthrosis). Patients were compared based on the construct's upper-instrumented vertebra: upper thoracic (UT: T1-6) versus thoracolumbar junction (TLjxn: T9-L2). Of 501 patients, 382 met inclusion criteria. Fifty-one patients [UT:14; TLjxn: 40 at index; average follow-up 32.6 months (6-92 months)] had revisions for PJF, which summed to $3.2 million total direct cost. Average direct cost of index operations for the cohort ($68,294) was significantly greater than PJF-revisions ($55,547). Compared with TLjxn, UT had a significantly higher average cost for index operations ($79,860 vs. $65,868). However, PJF-revision cases were similar in average cost (UT:$60,103; TLjxn:$53,920; P = 0.09). Costs of PJF amounted to an additional 12.1% of the total index surgical cost in 382 patients. Revision operations for PJF after long thoracolumbar fusions for ASD are associated with an average direct cost of $55,547 per case. Revision costs for PJF are similar based on the index procedure's upper-instrumented vertebra level. At a major tertiary center over a 10-year period, PJF came at a very significant economic expense amounting to $3.2 million for 57 cases. 3.
Construction of a low-cost luximeter
NASA Astrophysics Data System (ADS)
Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.
2016-04-01
This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
Evaluation of Nontraditional Airfield Pavement Surfaces for Contingency Operations
2014-01-01
such as asphalt or portland cement concrete are not readily available or are too cost-, labor-, or equipment-intensive to use. This report presents a...courses) are generally constructed using hot mix asphalt (HMA) or portland cement concrete (PCC), both of which are suitable for C-17 and C-130...associated with PCC or HMA surfacing. Stabilization can be accomplished by blending additives such as portland cement , lime, fly ash, asphalt binder
U.S. - Mexico Security Cooperation: The Time to Act Is Now
2011-01-06
laws will take considerable time and effort to achieve. It is worth the resources invested as it will provide the most benefit to all citizens if...limited number of border crossing checkpoints. Additional benefits of this construct would be to reduce the costs of goods, as transportation times and... benefits to society: billions of dollars in increased tax revenue, relief for overworked law enforcement, courts and prisons, and increased safety
A STUDY ON THE HIERARCHY OF MANAGEMENT ELEMENTS
NASA Astrophysics Data System (ADS)
Suzuki, Nobuyuki; Watanabe, Tadashi
Compared to the late 20th century, the Japanese construction industry has drastically changed its business methodology, outlook and approach in response to global issues and the incredible advances in technology. Such influences, non-exhaustively include the; WTO Government procurement agreement, updating conditions of tendering and contracting, client demands for cost reduction and the rapid penetration of ICT (Information and Communication Technology) into modern society. These days, the significance of controlling Quality, Cost and Time (the so-called QCT) has been recognized as an eternal-triangle by almost all countries, Government organizations and the private sector. However, as the construction industry is exposed to , and influenced by, more and more internal and external dynamic factors, continued reliance on managing and controlling QCT elements on their own is no longer adequate in meeting the growing demands and expectations, and as such control of additional management elements is now essential to avoid problems, or minimize their potential impacts should they occur. This paper utilizes the results of a survey carried out amongst construction managers and consultants in Japan and overseas to develop a spatial network that defines the interaction of management factors as a weighted graphical model. The calculated closeness centrality index of the developed management network model is adopted to identify the initialelement hierarchy, which is then further analyzed using the minimum distance of independent relationships of management elements (Warshall-Floyd algorism methodology), to identify the optimum potential hierarchy for effective construction management. A key result of the analysis is the significance of "Human Resource" in the construction industry management element hierarchy alongside the traditional QCT elements.
Product Recommendation System Based on Personal Preference Model Using CAM
NASA Astrophysics Data System (ADS)
Murakami, Tomoko; Yoshioka, Nobukazu; Orihara, Ryohei; Furukawa, Koichi
Product recommendation system is realized by applying business rules acquired by data maining techniques. Business rules such as demographical patterns of purchase, are able to cover the groups of users that have a tendency to purchase products, but it is difficult to recommend products adaptive to various personal preferences only by utilizing them. In addition to that, it is very costly to gather the large volume of high quality survey data, which is necessary for good recommendation based on personal preference model. A method collecting kansei information automatically without questionnaire survey is required. The constructing personal preference model from less favor data is also necessary, since it is costly for the user to input favor data. In this paper, we propose product recommendation system based on kansei information extracted by text mining and user's preference model constructed by Category-guided Adaptive Modeling, CAM for short. CAM is a feature construction method that can generate new features constructing the space where same labeled examples are close and different labeled examples are far away from some labeled examples. It is possible to construct personal preference model by CAM despite less information of likes and dislikes categories. In the system, retrieval agent gathers the products' specification and user agent manages preference model, user's likes and dislikes. Kansei information of the products is gained by applying text mining technique to the reputation documents about the products on the web site. We carry out some experimental studies to make sure that prefrence model obtained by our method performs effectively.
NASA Astrophysics Data System (ADS)
Bradford, J. H.
2009-12-01
Commercial development of multi-channel ground-penetrating radar (GPR) systems has made acquisition of continuous multi-offset (CMO) data more cost effective than ever. However, additional operator training, equipment costs, field and analysis time, and computation requirements necessarily remain substantially higher than conventional fixed offset GPR surveys. The choice to conduct a CMO survey is a target driven optimization problem where in many cases the added value outweighs the additional cost. Drawing examples from surface water, groundwater, snow, and glacier hydrology, I demonstrate a range of information that can be derived from CMO data with particular emphasis on estimating material properties of relevance to hydrological problems. Careful data acquisition is key to accurate property measurements. CMO geometries can be constructed with a single-channel system although with a significant loss of time and personnel efficiency relative to modern multi-channel systems. Using procedures such as common-midpoint stacking and pre-stack velocity filtering, it is possible to substantially improve the signal-to-noise ratio in GPR reflection images. However, the primary advantage of CMO data is dense sampling of a wide aperture of travelpaths through the subsurface. These data provide the basis for applying tomographic imaging techniques. Reflection velocity tomography in the pre-stack migration domain provides a robust approach to constructing accurate and detailed electromagnetic velocity models. These models in turn are used in conjunction with petrophysical models to estimate hydrologic properties such as porosity. Additionally, we can utilize the velocity models in conjunction with analysis of the frequency dependent attenuation to evaluate real and complex dielectric permittivity. The real and complex components of dielectric permittivity may have differing sensitivity to different components of the hydrologic system. Understanding this behavior may lead to improved understanding of relevant lithologic properties such as bulk clay content or fluid chemical composition during biodegradation of hydrocarbon contaminants. In addition to velocity tomography, CMO data enable reflection attenuation difference tomography. While time-lapse attenuation difference tomography using crosswell GPR transmission data is a well established technique for imaging conductive tracers in groundwater systems, it is not common for reflection data. Numerical examples based on a realistic aquifer model show that surface data can provide resolution of conductive tracer zones that is comparable to cross well data, thereby minimizing the need for invasive and expensive boreholes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... cost for purposes of leasehold surrender interest value be determined? 51.56 Section 51.56 Parks... Leasehold Surrender Interest § 51.56 How will the construction cost for purposes of leasehold surrender... false, misleading or incomplete information. [66 FR 35083, July 3, 2001] ...
Green Energy in New Construction: Maximize Energy Savings and Minimize Cost
ERIC Educational Resources Information Center
Ventresca, Joseph
2010-01-01
People often use the term "green energy" to refer to alternative energy technologies. But green energy doesn't guarantee maximum energy savings at a minimum cost--a common misconception. For school business officials, green energy means getting the lowest energy bills for the lowest construction cost, which translates into maximizing green energy…
Building a 40% Energy Saving House in the Mixed-Humid Climate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christian, Jeffrey E; Bonar, Jacob
2011-10-01
This report describes a home that uses 40% less energy than the energy-efficient Building America standard - a giant step in the pursuit of affordable near-zero-energy housing through the evolution of five near-zero-energy research houses. This four-bedroom, two-bath, 1232-ft2 house has a Home Energy Rating System (HERS) index of 35 (a HERS rating of 0 is a zero-energy house, a conventional new house would have a HERS rating of 100), which qualifies it for federal energy efficiency and solar incentives. The house is leading to the planned construction of a similar home in Greensburg, Kansas, and 21 staff houses inmore » the Walden Reserve, a 7000-unit "deep green" community in Cookville, Tennessee. Discussions are underway for construction of similar houses in Charleston, South Carolina, Seattle, Washington, Knoxville and Oak Ridge, Tennessee, and upstate New York. This house should lead to a 40% and 50% Gate-3, Mixed-Humid-Climate Joule for the DOE Building America Program. The house is constructed with structurally-insulated-panel walls and roof, raised metal-seam roof with infrared reflective coating, airtight envelope (1.65 air changes per hour at 50 Pascal), supply mechanical ventilation, ducts inside the conditioned space, extensive moisture control package, foundation geothermal space heating and cooling system, ZEHcor wall, solar water heater, and a 2.2 kWp grid-connected photovoltaic (PV) system. The detailed specifications for the envelope and the equipment used in ZEH5 compared to all the houses in this series are shown in Tables 1 and 2. Based on a validated computer simulation of ZEH5 with typical occupancy patterns and energy services for four occupants, energy for this all-electric house is predicted to cost only $0.66/day ($0.86/day counting the hookup charges). By contrast, the benchmark house would require $3.56/day, including hookup charges (these costs are based on a 2006 residential rates of $0.07/kWh and solar buyback at $0.15/kWh). The solar fraction for this home located in Lenoir City, Tennessee, is predicted to be as high as 41%(accounting for both solar PV and the solar water heater). This all-electric home is predicted to use 25 kWh/day based on the one year of measured data used to calibrate a whole-building simulation model. Based on two years of measured data, the roof-mounted 2.2 kWp PV system is predicted to generate 7.5 kWh/day. The 2005 cost to commercially construct ZEH5, including builder profit and overhead, is estimated at about $150,000. This cost - for ZEH5's panelized construction, premanufactured utility wall (ZEHcor), foundation geothermal system, and the addition of the walkout lower level, and considering the falling cost for PV - suggests that the construction cost per ft2 for a ZEH5 two-story will be even more cost-competitive. The 2005 construction cost estimate for a finished-out ZEH5 with 2632 ft2 is $222,000 or $85/ft2. The intention of this report is to help builders and homeowners make the decision to build zero-energy-ready homes. Detailed drawings, specifications, and lessons learned in the construction and analysis of data from about 100 sensors monitoring thermal performance for a one-year period are presented. This information should be specifically useful to those considering structural insulated panel walls and roof, foundation geothermal space heating and cooling, solar water heater and roof-mounted, photovoltaic, grid-tied systems.« less
Path forward: emerging issues and challenges.
Gillen, Matt; Gittleman, Janie L
2010-06-01
The NIOSH Construction Program worked with industry stakeholders to develop a National Occupational Safety and Health Construction Agenda to target future research and activities. The Program and its partners are also cognizant that new developments can emerge over time and that research can play an important role in helping to understand and address these emerging issues. Examples of emerging issues relevant to construction safety and health are described. These include: (a) climate change and energy considerations; (b) green construction developments and opportunities; (c) new materials; (d) changes in industry structure and practice; (e) workforce developments and disparities; (f) injury underreporting and cost and risk shifting; and (g) increased interest in addressing root causes. Responding to emerging issues while maintaining a focus on fundamental longstanding issues represents an ongoing challenge for researchers and industry organizations. Additional research to understand the diffusion and adoption of research by the industry is also needed. Research accomplished to date provides a strong foundation for addressing future industry needs and trends. (c) 2010 Elsevier Ltd. All rights reserved.
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
Fu, Fang; Zhang, Tao
2016-01-01
A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost. PMID:27911939
Report of the HDA building Task Force.
Scheerer, Ernest W
2006-01-01
The Building Task Force, after researching the many options, recommended to the Board of Trustees that, at this time, it is in the best interest of the association and its members to keep the building. In addition to the reasons outlined in the preceding paragraphs, the conclusions drawn by the Task Force can be summarized as follows: 1) This is not the time to make a change as both land and construction costs are high; 2) There is little inventory at this time that would provide a significant improvement over the present building; 3) There is no urgent need to act now; and 4) Cost-effective changes can be made to make the building more valuable to the association.
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
24 CFR 585.306 - Designation of costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Construction management. (e) Relocation costs. (f) Legal fees. (g) Clearance and demolition. ..., rehabilitation, or new construction for the purposes of §§ 585.307, 585.309, 585.310, and 585.311. (a) Trainees...
Evaluation of construction strategies for PCC pavement rehabilitation projects.
DOT National Transportation Integrated Search
2010-09-30
This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...
Cost-Effectiveness of Apixaban Compared with Warfarin for Stroke Prevention in Atrial Fibrillation
Lee, Soyon; Mullin, Rachel; Blazawski, Jon; Coleman, Craig I.
2012-01-01
Background Apixaban was shown to be superior to adjusted-dose warfarin in preventing stroke or systemic embolism in patients with atrial fibrillation (AF) and at least one additional risk factor for stroke, and associated with reduced rates of hemorrhage. We sought to determine the cost-effectiveness of using apixaban for stroke prevention. Methods Based on the results from the Apixaban Versus Warfarin in Patients with Atrial Fibrillation (ARISTOTLE) trial and other published studies, we constructed a Markov model to evaluate the cost-effectiveness of apixaban versus warfarin from the Medicare perspective. The base-case analysis assumed a cohort of 65-year-old patients with a CHADS2 score of 2.1 and no contraindication to oral anticoagulation. We utilized a 2-week cycle length and a lifetime time horizon. Outcome measures included costs in 2012 US$, quality-adjusted life-years (QALYs), life years saved and incremental cost-effectiveness ratios. Results Under base case conditions, quality adjusted life expectancy was 10.69 and 11.16 years for warfarin and apixaban, respectively. Total costs were $94,941 for warfarin and $86,007 for apixaban, demonstrating apixaban to be a dominant economic strategy. Upon one-way sensitivity analysis, these results were sensitive to variability in the drug cost of apixaban and various intracranial hemorrhage related variables. In Monte Carlo simulation, apixaban was a dominant strategy in 57% of 10,000 simulations and cost-effective in 98% at a willingness-to-pay threshold of $50,000 per QALY. Conclusions In patients with AF and at least one additional risk factor for stroke and a baseline risk of ICH risk of about 0.8%, treatment with apixaban may be a cost-effective alternative to warfarin. PMID:23056642
Cost-effectiveness model for a specific mixture of prebiotics in The Netherlands.
Lenoir-Wijnkoop, I; van Aalderen, W M C; Boehm, G; Klaassen, D; Sprikkelman, A B; Nuijten, M J C
2012-02-01
The objective of this study was to assess the cost-effectiveness of the use of prebiotics for the primary prevention of atopic dermatitis in The Netherlands. A model was constructed using decision analytical techniques. The model was developed to estimate the health economic impact of prebiotic preventive disease management of atopic dermatitis. Data sources used include published literature, clinical trials and official price/tariff lists and national population statistics. The comparator was no supplementation with prebiotics. The primary perspective for conducting the economic evaluation was based on the situation in The Netherlands in 2009. The results show that the use of prebiotics infant formula (IMMUNOFORTIS(®)) leads to an additional cost of € 51 and an increase in Quality Adjusted Life Years (QALY) of 0.108, when compared with no prebiotics. Consequently, the use of infant formula with a specific mixture of prebiotics results in an incremental cost-effectiveness ratio (ICER) of € 472. The sensitivity analyses show that the ICER remains in all analyses far below the threshold of € 20,000/QALY. This study shows that the favourable health benefit of the use of a specific mixture of prebiotics results in positive short- and long-term health economic benefits. In addition, this study demonstrates that the use of infant formula with a specific mixture of prebiotics is a highly cost-effective way of preventing atopic dermatitis in The Netherlands.
Biomechanical and Cost Comparisons of Near-Far and Pin-Bar Constructs.
Whitney Kluk, Augusta; Zhang, Tina; Russell, Joseph P; Kim, Hyunchul; Hsieh, Adam H; O'Toole, Robert V
2017-03-01
Orthopedic dogma states that external fixator stiffness is improved by placing 1 pin close to the fracture and 1 as distant as possible ("near-far"). This fixator construct is thought to be less expensive than placing pins a shorter distance apart and using "pin-bar" clamps that attach pins to outriggers. The authors therefore hypothesized that the near-far construct is stiffer and less expensive. They compared mechanical stiffness and costs of near-far and pin-bar constructs commonly used for temporary external fixation of femoral shaft fractures. Their testing model simulated femoral shaft fractures in damage control situations. Fourth-generation synthetic femora (n=18) were used. The near-far construct had 2 pins that were 106 mm apart, placed 25 mm from the gap on each side of the fracture. The pin-bar construct pins were 55 mm apart, placed 40 mm from the gap. Mechanical testing was performed on a material test system machine. Stiffness was determined in the linear portion of the load-displacement curve for both constructs in 4 modes: axial compression, torsional loading, frontal plane 3-point bending, and sagittal plane 3-point bending. Costs were determined from a 2012 price guide. Compared with the near-far construct, the pin-bar construct had stiffness increased by 58% in axial compression (P<.05) and by 52% in torsional loading (P<.05). The pin-bar construct increased cost by 11%. In contrast to the authors' hypothesis and existing orthopedic dogma, the near-far construct was less stiff than the pin-bar construct and was similarly priced. Use of the pin-bar construct is mechanically and economically reasonable. [Orthopedics. 2017; 40(2):e238-e241.]. Copyright 2016, SLACK Incorporated.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
When does it pay to invest in a patch? The evolution of intentional niche construction.
Mohlenhoff, Kathryn A; Codding, Brian F
2017-09-01
Humans modify their environments in ways that significantly transform the earth's ecosystems. Recent research suggests that such niche-constructing behaviors are not passive human responses to environmental variation, but instead should be seen as active and intentional management of the environment. Although such research is useful in highlighting the interactive dynamics between humans and their natural world, the niche-construction framework, as currently applied, fails to explain why people would decide to modify their environments in the first place. To help resolve this problem, we use a model of technological intensification to analyze the cost-benefit trade-offs associated with niche construction as a form of patch investment. We use this model to assess the costs and benefits of three paradigmatic cases of intentional niche construction in Western North America: the application of fire in acorn groves, the manufacture of fishing weirs, and the adoption of maize agriculture. Intensification models predict that investing in patch modification (niche construction) only provides a net benefit when the amount of resources needed crosses a critical threshold that makes the initial investment worthwhile. From this, it follows that low-cost investments, such as burning in oak groves, should be quite common, while more costly investments, such as maize agriculture, should be less common and depend on the alternatives available in the local environment. We examine how patterns of mobility, risk management, territoriality, and private property also co-evolve with the costs and benefits of niche construction. This approach illustrates that explaining niche-constructing behavior requires understanding the economic trade-offs involved in patch investment. Integrating concepts from niche construction and technological intensification models within a behavioral ecological framework provides insights into the coevolution and active feedback between adaptive behaviors and environmental change across human history. © 2017 Wiley Periodicals, Inc.
Srivastava, Pratiksha; Dwivedi, Saurabh; Kumar, Naresh; Abbassi, Rouzbeh; Garaniya, Vikram; Yadav, Asheesh Kumar
2017-11-01
The present study explores low-cost cathode development possibility using radial oxygen loss (ROL) of Canna indica plants and intermittent aeration (IA) for wastewater treatment and electricity generation in constructed wetland-microbial fuel cell (CW-MFC) system. Two CW-MFC microcosms were developed. Amongst them, one microcosm was planted with Canna indica plants for evaluating the ROL dependent cathode reaction (CW-MFC dependent on ROL) and another microcosm was equipped with intermittent aeration for evaluating the intermittent aeration dependent cathode reaction (CW-MFC with additional IA). The CW-MFC with additional IA has achieved 78.71% and 53.23%, and CW-MFC dependent on ROL has achieved 72.17% and 46.77% COD removal from synthetic wastewater containing glucose loads of 0.7gL -1 and 2.0gL -1 , respectively. The maximum power density of 31.04mWm -3 and 19.60mWm -3 was achieved in CW-MFC with additional IA and CW-MFC dependent on ROL, respectively. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Daniell, James; Pomonis, Antonios; Gunasekera, Rashmin; Ishizawa, Oscar; Gaspari, Maria; Lu, Xijie; Aubrecht, Christoph; Ungar, Joachim
2017-04-01
In order to quantify disaster risk, there is a demand and need for determining consistent and reliable economic value of built assets at national or sub national level exposed to natural hazards. The value of the built stock in the context of a city or a country is critical for risk modelling applications as it allows for the upper bound in potential losses to be established. Under the World Bank probabilistic disaster risk assessment - Country Disaster Risk Profiles (CDRP) Program and rapid post-disaster loss analyses in CATDAT, key methodologies have been developed that quantify the asset exposure of a country. In this study, we assess the complementary methods determining value of building stock through capital investment data vs aggregated ground up values based on built area and unit cost of construction analyses. Different approaches to modelling exposure around the world, have resulted in estimated values of built assets of some countries differing by order(s) of magnitude. Using the aforementioned methodology of comparing investment data based capital stock and bottom-up unit cost of construction values per square meter of assets; a suitable range of capital stock estimates for built assets have been created. A blind test format was undertaken to compare the two types of approaches from top-down (investment) and bottom-up (construction cost per unit), In many cases, census data, demographic, engineering and construction cost data are key for bottom-up calculations from previous years. Similarly for the top-down investment approach, distributed GFCF (Gross Fixed Capital Formation) data is also required. Over the past few years, numerous studies have been undertaken through the World Bank Caribbean and Central America disaster risk assessment program adopting this methodology initially developed by Gunasekera et al. (2015). The range of values of the building stock is tested for around 15 countries. In addition, three types of costs - Reconstruction cost (building back to the standard required by building codes); Replacement cost (gross capital stock) and Book value (net capital stock - depreciated value of assets) are discussed and the differences in methodologies assessed. We then examine historical costs (reconstruction and replacement) and losses (book value) of natural disasters versus this upper bound of capital stock in various locations to examine the impact of a reasonable capital stock estimate. It is found that some historic loss estimates in publications are not reasonable given the value of assets at the time of the event. This has applications for quantitative disaster risk assessment and development of country disaster risk profiles, economic analyses and benchmarking upper loss limits of built assets damaged due to natural hazards.
A web-based Decision Support System for the optimal management of construction and demolition waste.
Banias, G; Achillas, Ch; Vlachokostas, Ch; Moussiopoulos, N; Papaioannou, I
2011-12-01
Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece. Copyright © 2011 Elsevier Ltd. All rights reserved.
The Impact of State Regulations on the Costs of Public School Construction
ERIC Educational Resources Information Center
Vincent, Jeffrey M.; Monkkonen, Paavo
2010-01-01
Spending by states and local school districts on school construction has increased dramatically over the last decade, not only because more and higher-quality schools are being built, but also because construction costs have increased by an unprecedented degree. Many states struggle to afford the new schools needed in local communities. The…
Investing in a robotic milking system: a Monte Carlo simulation analysis.
Hyde, J; Engel, P
2002-09-01
This paper uses Monte Carlo simulation methods to estimate the breakeven value for a robotic milking system (RMS) on a dairy farm in the United States. The breakeven value indicates the maximum amount that could be paid for the robots given the costs of alternative milking equipment and other important factors (e.g., milk yields, prices, length of useful life of technologies). The analysis simulates several scenarios under three herd sizes, 60, 120, and 180 cows. The base-case results indicate that the mean breakeven values are $192,056, $374,538, and $553,671 for each of the three progressively larger herd sizes. These must be compared to the per-unit RMS cost (about $125,000 to $150,000) and the cost of any construction or installation of other equipment that accompanies the RMS. Sensitivity analysis shows that each additional dollar spent on milking labor in the parlor increases the breakeven value by $4.10 to $4.30. Each dollar increase in parlor costs increases the breakeven value by $0.45 to $0.56. Also, each additional kilogram of initial milk production (under a 2x system in the parlor) decreases the breakeven by $9.91 to $10.64. Finally, each additional year of useful life for the RMS increases the per-unit breakeven by about $16,000 while increasing the life of the parlor by 1 yr decreases the breakeven value by between $5,000 and $6,000.
36 CFR 223.111 - Administration of contracts in designated disaster areas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... road or facility, the United States shall bear such increased construction cost if, as determined by... damages are so great that restoration, reconstruction, or construction is not practical under the cost...
Construction engineering inspection direct cost survey.
DOT National Transportation Integrated Search
2014-07-01
The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
23 CFR 140.907 - Overhead and indirect construction costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Overhead and indirect construction costs. 140.907 Section 140.907 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES... 18276, May 23, 1988] ...
Cost analysis of the built environment: the case of bike and pedestrian trials in Lincoln, Neb.
Wang, Guijing; Macera, Caroline A; Scudder-Soucie, Barbara; Schmid, Tom; Pratt, Michael; Buchner, David; Heath, Gregory
2004-04-01
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calculated. Trail length averaged 3.6 miles (range = 1.6-4.6 miles). Annual cost in 2002 dollars ranged from 25,762 to 248,479 (mean = 124,927; median = 171,064). The cost per mile ranged from 5735 to 54,017 (mean = 35,355; median = 37,994). The annual cost per user was 235 (range = 83-592), whereas per capita annual medical cost of inactivity was 622. Construction of trails fits a wide range of budgets and may be a viable health amenity for most communities. To increase trail cost-effectiveness, efforts to decrease cost and increase the number of users should be considered.
Zhou, Chengran
2017-01-01
Abstract Over the past decade, biodiversity researchers have dedicated tremendous efforts to constructing DNA reference barcodes for rapid species registration and identification. Although analytical cost for standard DNA barcoding has been significantly reduced since early 2000, further dramatic reduction in barcoding costs is unlikely because Sanger sequencing is approaching its limits in throughput and chemistry cost. Constraints in barcoding cost not only led to unbalanced barcoding efforts around the globe, but also prevented high-throughput sequencing (HTS)–based taxonomic identification from applying binomial species names, which provide crucial linkages to biological knowledge. We developed an Illumina-based pipeline, HIFI-Barcode, to produce full-length Cytochrome c oxidase subunit I (COI) barcodes from pooled polymerase chain reaction amplicons generated by individual specimens. The new pipeline generated accurate barcode sequences that were comparable to Sanger standards, even for different haplotypes of the same species that were only a few nucleotides different from each other. Additionally, the new pipeline was much more sensitive in recovering amplicons at low quantity. The HIFI-Barcode pipeline successfully recovered barcodes from more than 78% of the polymerase chain reactions that didn’t show clear bands on the electrophoresis gel. Moreover, sequencing results based on the single molecular sequencing platform Pacbio confirmed the accuracy of the HIFI-Barcode results. Altogether, the new pipeline can provide an improved solution to produce full-length reference barcodes at about one-tenth of the current cost, enabling construction of comprehensive barcode libraries for local fauna, leading to a feasible direction for DNA barcoding global biomes. PMID:29077841
Liu, Shanlin; Yang, Chentao; Zhou, Chengran; Zhou, Xin
2017-12-01
Over the past decade, biodiversity researchers have dedicated tremendous efforts to constructing DNA reference barcodes for rapid species registration and identification. Although analytical cost for standard DNA barcoding has been significantly reduced since early 2000, further dramatic reduction in barcoding costs is unlikely because Sanger sequencing is approaching its limits in throughput and chemistry cost. Constraints in barcoding cost not only led to unbalanced barcoding efforts around the globe, but also prevented high-throughput sequencing (HTS)-based taxonomic identification from applying binomial species names, which provide crucial linkages to biological knowledge. We developed an Illumina-based pipeline, HIFI-Barcode, to produce full-length Cytochrome c oxidase subunit I (COI) barcodes from pooled polymerase chain reaction amplicons generated by individual specimens. The new pipeline generated accurate barcode sequences that were comparable to Sanger standards, even for different haplotypes of the same species that were only a few nucleotides different from each other. Additionally, the new pipeline was much more sensitive in recovering amplicons at low quantity. The HIFI-Barcode pipeline successfully recovered barcodes from more than 78% of the polymerase chain reactions that didn't show clear bands on the electrophoresis gel. Moreover, sequencing results based on the single molecular sequencing platform Pacbio confirmed the accuracy of the HIFI-Barcode results. Altogether, the new pipeline can provide an improved solution to produce full-length reference barcodes at about one-tenth of the current cost, enabling construction of comprehensive barcode libraries for local fauna, leading to a feasible direction for DNA barcoding global biomes. © The Authors 2017. Published by Oxford University Press.
Booster Applications Facility report, phase 2
NASA Astrophysics Data System (ADS)
Thieberger, P.
1991-06-01
This report summarizes studies and planning performed by Brookhaven National Laboratory (BNL) personnel at the request of NASA for the design, construction and operation of experimental areas and facilities for utilization of ion beams from the BNL Booster synchrotron particle accelerator. These facilities would be primarily utilized to simulate space radiation for radiobiological research, shielding studies and detector calibrations. The feasibility of such a project has been established, preliminary designs and cost estimates have been developed and a formal proposal can be submitted pending DOE concurrence. The main body of this report consists of the material presented by BNL during the meeting with a NASA appointed Panel on December 10 and 11, 1990. The individual speakers have provided brief summaries of their talks and explanations of their figures. In addition there are two appendices. One, contains detailed discussion of the shared mode of operation and the corresponding beam compatibility tables. The second appendix contains cost estimate details. An executive summary on budgets and schedules has been added, containing possible phased construction and outfitting scenarios and the corresponding expense and commitment profiles as well as new operational cost estimates. Material contained in the executive summary reflects the correction of some errors and new studies performed in response to the NASA Panel suggestions.
Geothermal Heat Pump System for New Student Housing Project at the University at Albany Main Campus
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lnu, Indumathi
University at Albany successfully designed, constructed and is operating a new student housing building that utilizes ground source heat pump (GSHP) for heating and cooling the entire 191,500SF building. The installed system consists of a well field with 150 bores, 450 feet deep and (189) terminal heat pump units for a total capacity of 358 Tons cooling and 4,300 MBtu/h heating. The building opened in Fall 2012. The annual energy use and cost intensity of the building, after the changes made during the first 2 years’ of operation is 57kBtu/SF/Year and $1.30/SF/Year respectively. This is approximately 50% lower than themore » other residential quads on campus, despite the fact that the quads are not air-conditioned. The total project cost from design through 3-years of operations is approximately $6 Million, out of which $5.7 Million is for construction of the GSHP system including the well field. The University received a $2.78 Million grant from the Department of Energy. The estimated utility cost savings, compared to a baseline building with conventional HVAC system, is approximately $185,000. The estimated simple payback, after grant incentives, is 15 years. Additionally, the project has created 8.5FTE equivalent jobs.« less
Corps of Engineers’ Acquisition of Fish Hatchery Proves Costly.
1981-09-18
location, size, esti- mated cost, design , and construction timetables for facilities needed to meet the steelhead production requirements. To limit...hatchery "* * * is not recognized to be one of the more efficient and productive facilities in Idaho due to obvious con- straints in design , construction...agency’s decision to supply the product or service it- self because it would cost less must be supported by a comparativ , cost analysis. According to Corps
Value for money in drug treatment: economic evaluation of prison methadone.
Warren, Emma; Viney, Rosalie; Shearer, James; Shanahan, Marian; Wodak, Alex; Dolan, Kate
2006-09-15
Although methadone maintenance treatment in community settings is known to reduce heroin use, HIV infection and mortality among injecting drug users (IDU), little is known about prison methadone programs. One reason for this is the complexity of undertaking evaluations in the prison setting. This paper estimates the cost-effectiveness of the New South Wales (NSW) prison methadone program. Information from the NSW prison methadone program was used to construct a model of the costs of the program. The information was combined with data from a randomised controlled trial of provision of prison methadone in NSW. The total program cost was estimated from the perspective of the treatment provider/funder. The cost per heroin free day, compared with no prison methadone, was estimated. Assumptions regarding resource use were tested through sensitivity analysis. The annual cost of providing prison methadone in NSW was estimated to be 2.9 million Australian dollars (or 3,234 Australian dollars per inmate per year). The incremental cost effectiveness ratio is 38 Australian dollars per additional heroin free day. From a treatment perspective, prison methadone is no more costly than community methadone, and provides benefits in terms of reduced heroin use in prisons, with associated reduction in morbidity and mortality.
Tampekis, Stergios; Samara, Fani; Sakellariou, Stavros; Sfougaris, Athanassios; Christopoulou, Olga
2018-02-12
The sustainable forest management can be achieved only through environmentally sound and economically efficient and feasible forest road networks and transportation systems that can potentially improve the multi-functional use of forest resources. However, road network planning and construction suggest long-term finance that require a capital investment (cash outflow), which would be equal to the value of the total revenue flow (cash inflow) over the whole lifecycle project. This paper emphasizes in an eco-efficient and economical optimum evaluation method for the forest road networks in the mountainous forest of Metsovo, Greece. More specifically, with the use of this technique, we evaluated the forest roads' (a) total construction costs, (b) annual maintenance cost, and (c) log skidding cost. In addition, we estimated the total economic value of forest goods and services that are lost from the forest roads' construction. Finally, we assessed the optimum eco-efficient and economical forest roads densities based on linear equations that stem from the internal rate of return method (IRR) and have been presented graphically. Data analysis and its presentation are achieved with the contribution of geographic information systems (GIS). The technique which is described in this study can be for the decision makers an attractive and useful implement in order to select the most eco-friendly and economical optimum solution to plan forest road network or to evaluate the existing forest transportation systems. Hence, with the use of this method, we can combine not only the multi-objective utilization of natural resources but also the environmental protection of forest ecosystems.
Landscape esthetics: How to quantify the scenics of a river valley
Leopold, Luna Bergere
1969-01-01
There are an increasing number of bills before Congress that in one way or another affect the landscape or the environment. Each of these requires seemingly endless numbers of congressional hearings, which are recorded upon endless reams of paper.And if, for some reason, you happen to read the voluminous testimony surrounding one of these environment-affecting proposals, you will generally find a marked contrast between the volume and kind of information presented by those who are pressing for technical development - building a dam, constructing a highway, installing a nuclear power plant - and the testimony of those who either oppose the development or wish to alter it in some way. The developer usually employs numerical arguments, which tend to show that there is an economic benefit to be obtained by constructing something - whatever that something may be. The argument is usually expressed in terms of a "cost-benefit ratio." It is typically argued, for instance, that the construction cost of a given project will be repaid over a period of time and will yield a profit or a benefit in excess of the development costs by a ratio of, let us say, 1.2 to 1. The argument is further supported with great numbers of charts, graphs, tables, and additional figures.In marked contrast, those who favor protection of the environment against development are fewer in number, their statements are based on emotion or personal feelings, and they usually lack numerical information, quantitative data, and detailed computations. Perhaps this is the reason why this latter group seems to be continually fighting rearguard actions - losing battle after battle.
Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
NASA Astrophysics Data System (ADS)
Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul
2017-11-01
Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.
Low-cost satellite mechanical design and construction
NASA Astrophysics Data System (ADS)
Boisjolie-Gair, Nathaniel; Straub, Jeremy
2017-05-01
This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.
Murphy, Colin W; Parker, Nathan C
2014-02-18
Air pollution emissions regulation can affect the location, size, and technology choice of potential biofuel production facilities. Difficulty in obtaining air pollutant emission permits and the cost of air pollution control devices have been cited by some fuel producers as barriers to development. This paper expands on the Geospatial Bioenergy Systems Model (GBSM) to evaluate the effect of air pollution control costs on the availability, cost, and distribution of U.S. biofuel production by subjecting potential facility locations within U.S. Clean Air Act nonattainment areas, which exceed thresholds for healthy air quality, to additional costs. This paper compares three scenarios: one with air quality costs included, one without air quality costs, and one in which conversion facilities were prohibited in Clean Air Act nonattainment areas. While air quality regulation may substantially affect local decisions regarding siting or technology choices, their effect on the system as a whole is small. Most biofuel facilities are expected to be sited near to feedstock supplies, which are seldom in nonattainment areas. The average cost per unit of produced energy is less than 1% higher in the scenarios with air quality compliance costs than in scenarios without such costs. When facility construction is prohibited in nonattainment areas, the costs increase by slightly over 1%, due to increases in the distance feedstock is transported to facilities in attainment areas.
STANDARDIZED COSTS FOR WATER SUPPLY DISTRIBUTION SYSTEMS
Presented within the report are cost data for construction and operation/maintenance of domestic water distribution and transmission pipelines, domestic water pumping stations, and domestic water storage reservoirs. To allow comparison of new construction with rehabilitation of e...
Gachango, F G; Pedersen, S M; Kjaergaard, C
2015-12-01
Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.
Forecasting Construction Cost Index based on visibility graph: A network approach
NASA Astrophysics Data System (ADS)
Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong
2018-03-01
Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.
Additive Manufacturing Solutions in the United States Marine Corps
2017-12-01
4 demonstrates this process. A laser or a blade then cuts each layer to shape the final product. Wohlers (2017) states that “the cost of material is...printed sole for its running shoes. The top of the shoe is constructed from conventional fabric and is attached to the sole after it is printed...milling). This runs on 208 volts and provides a small work area (T. Arndt, personal communication, June 21, 2017). 1st Maintenance Battalion Marines
Feasibility Studies of Palm Oil Mill Waste Aggregates for the Construction Industry
Kanadasan, Jegathish; Ahmad Fauzi, Auni Filzah; Abdul Razak, Hashim; Selliah, Paramananthan; Subramaniam, Vijaya; Yusoff, Sumiani
2015-01-01
The agricultural industry in Malaysia has grown rapidly over the years. Palm oil clinker (POC) is a byproduct obtained from the palm oil industry. Its lightweight properties allows for its utilization as an aggregate, while in powder form as a filler material in concrete. POC specimens obtained throughout each state in Malaysia were investigated to evaluate the physical, chemical, and microstructure characteristics. Variations between each state were determined and their possible contributory factors were assessed. POC were incorporated as a replacement material for aggregates and their engineering characteristics were ascertained. Almost 7% of density was reduced with the introduction of POC as aggregates. A sustainability assessment was made through greenhouse gas emission (GHG) and cost factor analyses to determine the contribution of the addition of POC to the construction industry. Addition of POC helps to lower the GHG emission by 9.6% compared to control specimens. By channeling this waste into the construction industry, an efficient waste-management system can be promoted; thus, creating a cleaner environment. This study is also expected to offer some guides and directions for upcoming research works on the incorporation of POC. PMID:28793579
Literature review of the benefits and obstacle of horizontal directional drilling
NASA Astrophysics Data System (ADS)
Norizam, M. S. Mohd; Nuzul Azam, H.; Helmi Zulhaidi, S.; Aziz, A. Abdul; Nadzrol Fadzilah, A.
2017-11-01
In this new era the construction industry not only need to be completed within budget, timely, at acceptable quality and safety but the stakeholders especially the local authorities and the public realises for the important need of sustainable construction method to be used for our younger generation to heritage if not better a safer world for them to live and raise up their children’s. Horizontal Directional Drilling method is the most commonly recognised trenchless utilities method as a preferred construction method in this age. Among the reasons HDD method offers less disturbance on traffic, the public, business activities and neighbourhood, lower restoration cost, less noise, dust and minimum import/export of the construction materials. In addition HDD method can drill through congested utilities areas with minimum cutting and shorter time. This paper aims to appraise the benefits and obstacle of HDD method in construction industry. It is an endeavour to fulfil the local authorities cry for alternative method that less damages to the roads, road furniture’s and public complaints compared to the conventional open cut method. In addition HDD method is seem to be in line with sustainable development requirements e.g. reduce, reuse, recycle and etc. Hence, it is important to determine the benefits and obstacle factors of HDD implementation. The factors are based on the literature review conducted by the author on the subject matters gathered from previous studies, journals, text books, guidelines, magazine articles, newspaper cutting and etc.
Generalized enhanced suffix array construction in external memory.
Louza, Felipe A; Telles, Guilherme P; Hoffmann, Steve; Ciferri, Cristina D A
2017-01-01
Suffix arrays, augmented by additional data structures, allow solving efficiently many string processing problems. The external memory construction of the generalized suffix array for a string collection is a fundamental task when the size of the input collection or the data structure exceeds the available internal memory. In this article we present and analyze [Formula: see text] [introduced in CPM (External memory generalized suffix and [Formula: see text] arrays construction. In: Proceedings of CPM. pp 201-10, 2013)], the first external memory algorithm to construct generalized suffix arrays augmented with the longest common prefix array for a string collection. Our algorithm relies on a combination of buffers, induced sorting and a heap to avoid direct string comparisons. We performed experiments that covered different aspects of our algorithm, including running time, efficiency, external memory access, internal phases and the influence of different optimization strategies. On real datasets of size up to 24 GB and using 2 GB of internal memory, [Formula: see text] showed a competitive performance when compared to [Formula: see text] and [Formula: see text], which are efficient algorithms for a single string according to the related literature. We also show the effect of disk caching managed by the operating system on our algorithm. The proposed algorithm was validated through performance tests using real datasets from different domains, in various combinations, and showed a competitive performance. Our algorithm can also construct the generalized Burrows-Wheeler transform of a string collection with no additional cost except by the output time.
Acevedo, Joseph R; Fero, Katherine E; Wilson, Bayard; Sacco, Assuntina G; Mell, Loren K; Coffey, Charles S; Murphy, James D
2016-11-10
Purpose Recently, a large randomized trial found a survival advantage among patients who received elective neck dissection in conjunction with primary surgery for clinically node-negative oral cavity cancer compared with those receiving primary surgery alone. However, elective neck dissection comes with greater upfront cost and patient morbidity. We present a cost-effectiveness analysis of elective neck dissection for the initial surgical management of early-stage oral cavity cancer. Methods We constructed a Markov model to simulate primary, adjuvant, and salvage therapy; disease recurrence; and survival in patients with T1/T2 clinically node-negative oral cavity squamous cell carcinoma. Transition probabilities were derived from clinical trial data; costs (in 2015 US dollars) and health utilities were estimated from the literature. Incremental cost-effectiveness ratios, expressed as dollar per quality-adjusted life-year (QALY), were calculated with incremental cost-effectiveness ratios less than $100,000/QALY considered cost effective. We conducted one-way and probabilistic sensitivity analyses to examine model uncertainty. Results Our base-case model found that over a lifetime the addition of elective neck dissection to primary surgery reduced overall costs by $6,000 and improved effectiveness by 0.42 QALYs compared with primary surgery alone. The decrease in overall cost despite the added neck dissection was a result of less use of salvage therapy. On one-way sensitivity analysis, the model was most sensitive to assumptions about disease recurrence, survival, and the health utility reduction from a neck dissection. Probabilistic sensitivity analysis found that treatment with elective neck dissection was cost effective 76% of the time at a willingness-to-pay threshold of $100,000/QALY. Conclusion Our study found that the addition of elective neck dissection reduces costs and improves health outcomes, making this a cost-effective treatment strategy for patients with early-stage oral cavity cancer.
Total staff costs to implement a decision support system in nursing.
Castilho, Valéria; Lima, Antônio Fernandes Costa; Fugulin, Fernanda Maria Togeiro; Peres, Heloisa Helena Ciqueto; Gaidzinski, Raquel Rapone
2014-01-01
to identify the direct labor (DL) costs to put in practice a decision support system (DSS) in nursing at the University Hospital of the University of São Paulo (HU-USP). the development of the DSS was mapped in four sub-processes: Conception, Elaboration, Construction and Transition. To calculate the DL, the baseline salary per professional category was added to the five-year additional remuneration, representation fees and social charges, and then divided by the number of hours contracted, resulting in the hour wage/professional, which was multiplied by the time spend on each activity in the sub-processes. the DL cost corresponded to R$ 752,618.56 (100%), R$ 26,000.00 (3.45%) of which were funded by a funding agency, while R$ 726,618.56 (96,55%) came from Hospital and University resources. considering the total DL cost, 72.1% related to staff wages for the informatics consulting company and 27.9% to the DL of professionals at the HU and the School of Nursing.
Staged, High-Pressure Oxy-Combustion Technology: Development and Scale-Up
DOE Office of Scientific and Technical Information (OSTI.GOV)
Axelbaum, Richard; Kumfer, Benjamin; Gopan, Akshay
The immediate need for a high efficiency, low cost carbon capture process has prompted the recent development of pressurized oxy-combustion. With a greater combustion pressure the dew point of the flue gas is increased, allowing for effective integration of the latent heat of flue gas moisture into the Rankine cycle. This increases the net plant efficiency and reduces costs. A novel, transformational process, named Staged, Pressurized Oxy-Combustion (SPOC), achieves additional step changes in efficiency and cost reduction by significantly reducing the recycle of flue gas. The research and development activities conducted under Phases I and II of this project (FE0009702)more » include: SPOC power plant cost and performance modeling, CFD-assisted design of pressurized SPOC boilers, theoretical analysis of radiant heat transfer and ash deposition, boiler materials corrosion testing, construction of a 100 kWth POC test facility, and experimental testing. The results of this project have advanced the technology readiness level (TRL) of the SPOC technology from 1 to 5.« less
NASA Astrophysics Data System (ADS)
Shishebori, Davood; Babadi, Abolghasem Yousefi
2018-03-01
This study investigates the reliable multi-configuration capacitated logistics network design problem (RMCLNDP) under system disturbances, which relates to locating facilities, establishing transportation links, and also allocating their limited capacities to the customers conducive to provide their demand on the minimum expected total cost (including locating costs, link constructing costs, and also expected costs in normal and disturbance conditions). In addition, two types of risks are considered; (I) uncertain environment, (II) system disturbances. A two-level mathematical model is proposed for formulating of the mentioned problem. Also, because of the uncertain parameters of the model, an efficacious possibilistic robust optimization approach is utilized. To evaluate the model, a drug supply chain design (SCN) is studied. Finally, an extensive sensitivity analysis was done on the critical parameters. The obtained results show that the efficiency of the proposed approach is suitable and is worthwhile for analyzing the real practical problems.
Construction of VLCC marine oil storage cost index system
NASA Astrophysics Data System (ADS)
Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen
2018-04-01
VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.
The design and construction of a cost-efficient confocal laser scanning microscope
NASA Astrophysics Data System (ADS)
Xi, Peng; Rajwa, Bartlomiej; Jones, James T.; Robinson, J. Paul
2007-03-01
The optical dissection ability of confocal microscopy makes it a powerful tool for biological materials. However, the cost and complexity of confocal scanning laser microscopy hinders its wide application in education. We describe the construction of a simplified confocal scanning laser microscope and demonstrate three-dimensional projection based on cost-efficient commercial hardware, together with available open source software.
Ou, Huang-Tz; Yang, Chen-Yi; Wang, Jung-Der; Hwang, Jing-Shiang; Wu, Jin-Shang
2016-12-01
To assess additional life expectancy (LE), expected years of life lost , and lifetime health care expenditures after type 1 diabetes diagnosis, stratified by sex and age of first diagnosis (early: 0-12 years; late: 13-40 years). A longitudinal cohort of patients with diabetes was constructed from Taiwan's National Health Insurance Research Database of 1999 to 2012. The survival functions for diabetic patients and age- and sex-matched general population were estimated by using a semiparametric extrapolation method with annual life tables. The average monthly health care expenditures were multiplied by the corresponding monthly survival rates and summed to calculate the lifetime health care expenditures. Cox proportional hazard models were constructed to corroborate the effects of sex and age, after being adjusted for comorbidities, complications, and calendar years. A total of 2386 cases (45% early diagnosis, 49% males) were identified. An additional LE after diabetes diagnosis was 45.12 years, with an estimated 17.63 years of life lost. The predicted total and diabetes-related lifetime costs were $56,939 and $102,140, respectively. Early diagnosed patients had a longer LE and lower health care spending compared with those of late-diagnosed patients. Male patients had a shorter LE and a higher expected years of life lost than the female patients, which corresponded to lower lifetime costs for the former. The Cox model results for overall mortality corroborated these trends. Early detection of type 1 diabetes and sex-specific strategies would probably improve long-term health outcomes and save on the cost of diabetes care. Copyright © 2016 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.
Rapid Leaf Deployment Strategies in a Deciduous Savanna
2016-01-01
Deciduous plants avoid the costs of maintaining leaves in the unfavourable season, but carry the costs of constructing new leaves every year. Deciduousness is therefore expected in ecological situations with pronounced seasonality and low costs of leaf construction. In our study system, a seasonally dry tropical savanna, many trees are deciduous, suggesting that leaf construction costs must be low. Previous studies have, however, shown that nitrogen is limiting in this system, suggesting that leaf construction costs are high. Here we examine this conundrum using a time series of soil moisture availability, leaf phenology and nitrogen distribution in the tree canopy to illustrate how trees resorb nitrogen before leaf abscission and use stored reserves of nitrogen and carbon to construct new leaves at the onset of the growing season. Our results show that trees deployed leaves shortly before and in anticipation of the first rains with its associated pulse of nitrogen mineralisation. Our results also show that trees rapidly constructed a full canopy of leaves within two weeks of the first rains. We detected an increase in leaf nitrogen content that corresponded with the first rains and with the movement of nitrogen to more distal branches, suggesting that stored nitrogen reserves are used to construct leaves. Furthermore the stable carbon isotope ratios (δ13C) of these leaves suggest the use of stored carbon for leaf construction. Our findings suggest that the early deployment of leaves using stored nitrogen and carbon reserves is a strategy that is integrally linked with the onset of the first rains. This strategy may confer a competitive advantage over species that deploy leaves at or after the onset of the rains. PMID:27310398
Highway construction cost comparison survey : final report
DOT National Transportation Integrated Search
2002-04-01
Over the past few years the Washington State Department of Transportation (WSDOT) has been asked numerous questions related to the cost of highway construction in Washington State as compared to other states. In order to address these questions, WSDO...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
DOT National Transportation Integrated Search
1999-05-01
This paper uses Federal Aid Highway program information for 1990 to 1994 to define a natural experiment that evaluates whether compliance with federal environmental regulations increases construction costs. This is accomplished by considering whether...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
10 CFR 609.12 - Project Costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, P.F.; Heyen, K.K.; McCormack, R.G.
1987-10-01
Because of developments in electronics technology, the need for electromagnetic shielding has increased. To reduce the cost of this shielding, new materials are needed. The U.S. Army Corps of Engineers, Fort Worth District (FWD), and the U.S. Army Construction Engineering Research Laboratory (USA-CERL) have developed composite materials that use standard, construction-grade, aluminum foil-backed gypsum board in combination with either a metal mesh or lead foil. Special seams for these composites were designed by U.S. Gypsum Company. USA-CERL evaluated the adequacy of each material and seam design by using radio-frequency antennas and receivers to measure its shielding effectiveness when mounted inmore » the wall of a shielded room. These evaluations showed that the composite panels met the specified requirement of 60 decibels (dB) of shielding. The composites were also shown to be adequate for most communications security applications. However, the addition of a seam decreased shielding by as much as 10 dB.« less
Relative Economy of Different Methods of Airplane Construction
NASA Technical Reports Server (NTRS)
Herrmann, H
1931-01-01
A comparison of the relative economy of airplane construction shows that monoplanes are cheaper than biplanes; that all-metal construction is much more expensive than mixed construction; that multi-engine airplanes are more expensive than single-engine types of the same carrying capacity and speed;that the cost of airplanes is materially reduced by increasing their size without increasing the number of engines. The greatest economy usually coincides with the best aerodynamic and static conditions and the cost is always increased by safety requirements.
NASA Technical Reports Server (NTRS)
Werkheiser, Niki J.; Fiske, Michael R.; Edmunson, Jennifer E.; Khoshnevis, Berokh
2015-01-01
For long-duration missions on other planetary bodies, the use of in situ materials will become increasingly critical. As human presence on these bodies expands, so must the breadth of the structures required to accommodate them including habitats, laboratories, berms, radiation shielding for natural radiation and surface reactors, garages, solar storm shelters, greenhouses, etc. Planetary surface structure manufacturing and assembly technologies that incorporate in situ resources provide options for autonomous, affordable, pre-positioned environments with radiation shielding features and protection from micrometeorites, exhaust plume debris, and other hazards. The ability to use in-situ materials to construct these structures will provide a benefit in the reduction of up-mass that would otherwise make long-term Moon or Mars structures cost prohibitive. The ability to fabricate structures in situ brings with it the ability to repair these structures, which allows for the self-sufficiency and sustainability necessary for long-duration habitation. Previously, under the auspices of the MSFC In-Situ Fabrication and Repair (ISFR) project and more recently, under the jointly-managed MSFC/KSC Additive Construction with Mobile Emplacement (ACME) project, the MSFC Surface Structures Group has been developing materials and construction technologies to support future planetary habitats with in-situ resources. One such additive construction technology is known as Contour Crafting. This paper presents the results to date of these efforts, including development of novel nozzle concepts for advanced layer deposition using this process. Conceived initially for rapid development of cementitious structures on Earth, it also lends itself exceptionally well to the automated fabrication of planetary surface structures using minimally processed regolith as aggregate, and binders developed from in situ materials as well. This process has been used successfully in the fabrication of construction elements using lunar regolith simulant and Mars regolith simulant, both with various binder materials. Future planned activities will be discussed as well.
NASA Astrophysics Data System (ADS)
Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad
2017-11-01
Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.
Arbab, Mandana; Srinivasan, Sharanya; Hashimoto, Tatsunori; Geijsen, Niels; Sherwood, Richard I.
2015-01-01
Summary We present self-cloning CRISPR/Cas9 (scCRISPR), a technology that allows for CRISPR/Cas9-mediated genomic mutation and site-specific knockin transgene creation within several hours by circumventing the need to clone a site-specific single-guide RNA (sgRNA) or knockin homology construct for each target locus. We introduce a self-cleaving palindromic sgRNA plasmid and a short double-stranded DNA sequence encoding the desired locus-specific sgRNA into target cells, allowing them to produce a locus-specific sgRNA plasmid through homologous recombination. scCRISPR enables efficient generation of gene knockouts (∼88% mutation rate) at approximately one-sixth the cost of plasmid-based sgRNA construction with only 2 hr of preparation for each targeted site. Additionally, we demonstrate efficient site-specific knockin of GFP transgenes without any plasmid cloning or genome-integrated selection cassette in mouse and human embryonic stem cells (2%–4% knockin rate) through PCR-based addition of short homology arms. scCRISPR substantially lowers the bar on mouse and human transgenesis. PMID:26527385
NASA Astrophysics Data System (ADS)
Zhi, Xiaohua; Yang, Haijun; Berthold, Sascha; Doetsch, Christian; Shen, Jianquan
Treatment of highly concentrated organic wastewater is characterized as cost-consuming. The conventional technology uses the anaerobic-anoxic-oxic process (A 2/O), which does not produce hydrogen. There is potential for energy saving using hydrogen utilization associated with wastewater treatment because hydrogen can be produced from organic wastewater using anaerobic fermentation. A 50 m 3 pilot bio-reactor for hydrogen production was constructed in Shandong Province, China in 2006 but to date the hydrogen produced has not been utilized. In this work, a technical-economic model based on hydrogen utilization is presented and analyzed to estimate the potential improvement to a citric wastewater plant. The model assesses the size, capital cost, annual cost, system efficiency and electricity cost under different configurations. In a stand-alone situation, the power production from hydrogen is not sufficient for the required load, thus a photovoltaic array (PV) is employed as the power supply. The simulated results show that the combination of solar and bio-hydrogen has a much higher cost compared with the A 2/O process. When the grid is connected, the system cost achieved is 0.238 US t -1 wastewater, which is lower than 0.257 US t -1 by the A 2/O process. The results reveal that a simulated improvement by using bio-hydrogen and a FC system is effective and feasible for the citric wastewater plant, even when compared to the current cost of the A 2/O process. In addition, lead acid and vanadium flow batteries were compared for energy storage service. The results show that a vanadium battery has lower cost and higher efficiency due to its long lifespan and energy efficiency. Additionally, the cost distribution of components shows that the PV dominates the cost in the stand-alone situation, while the bio-reactor is the main cost component in the parallel grid.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of the Director's determination of construction cost under § 51.56. The arbitration procedures are... improvement will be binding on the concessioner and the Director. [66 FR 35083, July 3, 2001] ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Director's determination of construction cost under § 51.56. The arbitration procedures are... improvement will be binding on the concessioner and the Director. [66 FR 35083, July 3, 2001] ...
DOT National Transportation Integrated Search
2003-04-01
The Louisiana Department of Transportation and Development (LADOTD) is interested in applying the Federal Highway Administration=s (FHWA) life cycle cost analysis procedures and model to large roadway construction, maintenance, and rehabilitation pro...
Construction costs, payback times, and the leaf economics of carnivorous plants.
Karagatzides, Jim D; Ellison, Aaron M
2009-09-01
Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.
Rehabilitation of adobe buildings. Understanding different materials from Portugal
NASA Astrophysics Data System (ADS)
Costa, Cristiana; Rocha, Fernando; Velosa, Ana
2016-04-01
Earth construction is the oldest building material known, with documented cases of the use of earth bricks since Mesopotamia around 10 000 BC (Heathcote, 1995). The earth construction exists throughout the majority of the world in different cultures, and for some countries, nowadays it continues to be the main process of construction (Vega et al, 2011). Around 30% of the world's population lives in buildings made of earth materials. Earthen construction is an environmentally friendly technique with a social and cultural contribution; this advantage is increased when this type of construction is applied in developing countries where the material costs counterbalance with labour costs, and where other materials and techniques cannot be available (Ciancio et al, 2013). Studies of materials characterization are required in order to understand the composition and specific properties of the earth buildings, their heterogeneity and their degradation mechanisms. Some adobes from different buildings, ages and regions of Portugal were collected in order to characterize them (mineralogically, chemically and physically). It was possible to understand the composition of these materials and their differences. Main minerals are quartz, feldspars, calcite and phyllosilicates (mica and kaolinite). The mechanical behaviour of these materials isn't the best, but it is possible to improve it with some simple and cheap natural additives (kaolinitic soils). The characterization of these materials allows us to understand the differences between the materials from the different regions (controlled by locally available raw materials). Understanding these materials, and their properties, it is possible to formulate new ones for repair, conservation and rehabilitation works. The adobe bricks are an alternative of kiln baked bricks which has several advantages and one of the most important is that these materials are recyclable. Adobes are an excellent option for building rehabilitation, if composition is optimised.
The discrete adjoint method for parameter identification in multibody system dynamics.
Lauß, Thomas; Oberpeilsteiner, Stefan; Steiner, Wolfgang; Nachbagauer, Karin
2018-01-01
The adjoint method is an elegant approach for the computation of the gradient of a cost function to identify a set of parameters. An additional set of differential equations has to be solved to compute the adjoint variables, which are further used for the gradient computation. However, the accuracy of the numerical solution of the adjoint differential equation has a great impact on the gradient. Hence, an alternative approach is the discrete adjoint method , where the adjoint differential equations are replaced by algebraic equations. Therefore, a finite difference scheme is constructed for the adjoint system directly from the numerical time integration method. The method provides the exact gradient of the discretized cost function subjected to the discretized equations of motion.
Optimal consensus algorithm integrated with obstacle avoidance
NASA Astrophysics Data System (ADS)
Wang, Jianan; Xin, Ming
2013-01-01
This article proposes a new consensus algorithm for the networked single-integrator systems in an obstacle-laden environment. A novel optimal control approach is utilised to achieve not only multi-agent consensus but also obstacle avoidance capability with minimised control efforts. Three cost functional components are defined to fulfil the respective tasks. In particular, an innovative nonquadratic obstacle avoidance cost function is constructed from an inverse optimal control perspective. The other two components are designed to ensure consensus and constrain the control effort. The asymptotic stability and optimality are proven. In addition, the distributed and analytical optimal control law only requires local information based on the communication topology to guarantee the proposed behaviours, rather than all agents' information. The consensus and obstacle avoidance are validated through simulations.
Remote sensing for developing world agriculture: opportunities and areas for technical development
NASA Astrophysics Data System (ADS)
Jeunnette, Mark N.; Hart, Douglas P.
2016-10-01
A parameterized numerical model is constructed to compare platform options for collecting aerial imagery to support agriculture electronic information services in developing countries like India. A sensitivity analysis shows that when Unmanned Aerial Vehicles, UAVs, are limited in flight altitude by regulations, the velocity and altitude available to manned aircraft lead to a lower cost of operation at altitudes greater than 2000ft above ground level, AGL. If, however, the UAVs are allowed to fly higher, they become cost-competitive once again at approximately 1000ft AGL or higher. Examination of assumptions in the model highlights two areas for additional technology development: baseline-dependent feature-based image registration to enable wider area coverage, and reflectance reconstruction for ratio-based agriculture indices.
ERIC Educational Resources Information Center
Lowe, N. K., Ed.
This document provides technical information and simple instructions for constructing 84 different pieces of science equipment. Each entry includes: (1) name of item; (2) purpose of the equipment; (3) person who submitted the information; (4) line drawing of prototype; (5) list of low-cost materials needed; (6) construction procedures; (7)…
J. N. Kochenderfer; G. W. Wendel; H. Clay Smith
1984-01-01
A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...
Millar, J Alasdair; Millar, Robyn C
2014-01-01
The Australian federal government has proposed an AUD $7 patient co-payment for a general practitioner (GP) consultation. One effect of the co-payment may be that patients will seek assistance at public hospital emergency departments (EDs), where currently there is no user charge. We studied the possible financial impact of patient diversion on the Western Australia (WA) health budget. We constructed a spreadsheet model of changes in annual cash flows including the co-payment, GP fees for service, and rates of diversion to emergency departments with additional marginal costs for ED attendance. Changes in WA cash flows are the aggregate of marginal ED costs of treating diverted patients and added expenditure in fees paid to rural doctors who also man local emergency centres. The estimated costs to WA are AUD $6.3 million, $35.9 million and $87.4 million at 1, 5, and 10 per cent diversion, respectively. Commonwealth receipts increase and expenditure on Medicare benefits declines. A diversion of patients from GP surgeries to ED in WA caused by the co-payment will result in increased costs to the state, which may be substantial, and will reduce net costs to the Commonwealth.
Wright, Jonathan L; Wessells, Hunter; Nathens, Avery B; Hollingworth, Will
2006-05-01
Direct vision internal urethrotomy (DVIU) and urethroplasty are the primary methods of managing urethral stricture disease. Using decision analysis, we determine the cost-effectiveness of different management strategies for short, bulbar urethral strictures 1 to 2 cm in length. A decision tree was constructed, with the number of planned possible DVIUs before attempting urethroplasty defined for each primary branch point. Success rates were obtained from published reports. Costs were estimated from a societal perspective and included the costs of the procedures and office visits and lost wages from convalescence. Sensitivity analyses were conducted, varying the success rates of the procedures and cost estimates. The most cost-effective approach was one DVIU before urethroplasty. The incremental cost of performing a second DVIU before attempting urethroplasty was $141,962 for each additional successfully voiding patient. In the sensitivity analysis, urethroplasty as the primary therapy was cost-effective only when the expected success rate of the first DVIU was less than 35%. The most cost-effective strategy for the management of short, bulbar urethral strictures is to reserve urethroplasty for patients in whom a single endoscopic attempt fails. For longer strictures for which the success rate of DVIU is expected to be less than 35%, urethroplasty as primary therapy is cost-effective. Future prospective, multicenter studies of DVIU and urethroplasty outcomes would help enhance the accuracy of our model.
MAN-004 Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Timothy L.
2014-07-01
At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.« less
NASA Astrophysics Data System (ADS)
Qi, Wei
2017-11-01
Cost-benefit analysis is commonly used for engineering planning and design problems in practice. However, previous cost-benefit based design flood estimation is based on stationary assumption. This study develops a non-stationary cost-benefit based design flood estimation approach. This approach integrates a non-stationary probability distribution function into cost-benefit analysis, and influence of non-stationarity on expected total cost (including flood damage and construction costs) and design flood estimation can be quantified. To facilitate design flood selections, a 'Risk-Cost' analysis approach is developed, which reveals the nexus of extreme flood risk, expected total cost and design life periods. Two basins, with 54-year and 104-year flood data respectively, are utilized to illustrate the application. It is found that the developed approach can effectively reveal changes of expected total cost and extreme floods in different design life periods. In addition, trade-offs are found between extreme flood risk and expected total cost, which reflect increases in cost to mitigate risk. Comparing with stationary approaches which generate only one expected total cost curve and therefore only one design flood estimation, the proposed new approach generate design flood estimation intervals and the 'Risk-Cost' approach selects a design flood value from the intervals based on the trade-offs between extreme flood risk and expected total cost. This study provides a new approach towards a better understanding of the influence of non-stationarity on expected total cost and design floods, and could be beneficial to cost-benefit based non-stationary design flood estimation across the world.
Estimating procedure for major highway construction bid item cost : final report.
DOT National Transportation Integrated Search
1978-06-01
The present procedure for estimating construction bid item cost makes use of the quarterly weighted average unit price report coupled with engineering judgement. The limitation to this method is that this report format provides only the lowest bid da...
Strategic real-estate planning can generate revenue.
Hayes, D; Hays, S
2001-12-01
Many healthcare organizations treat their real estate as liabilities rather than assets and overlook opportunities to generate significant additional revenue and reduce costs. An Ernst & Young Study found that to maximize the return on investment in their real-estate holdings, healthcare organizations need to include property management in their strategic plan, manage construction and expansion effectively, adapt and reuse their facilities where possible, and pursue innovative real-estate strategies. Managing real-estate assets effectively can free up capital to use for other core business needs.
Cement and Concrete Nanoscience and Nanotechnology
Raki, Laila; Beaudoin, James; Alizadeh, Rouhollah; Makar, Jon; Sato, Taijiro
2010-01-01
Concrete science is a multidisciplinary area of research where nanotechnology potentially offers the opportunity to enhance the understanding of concrete behavior, to engineer its properties and to lower production and ecological cost of construction materials. Recent work at the National Research Council Canada in the area of concrete materials research has shown the potential of improving concrete properties by modifying the structure of cement hydrates, addition of nanoparticles and nanotubes and controlling the delivery of admixtures. This article will focus on a review of these innovative achievements.
Empirical Assessment of Spatial Prediction Methods for Location Cost Adjustment Factors
Migliaccio, Giovanni C.; Guindani, Michele; D'Incognito, Maria; Zhang, Linlin
2014-01-01
In the feasibility stage, the correct prediction of construction costs ensures that budget requirements are met from the start of a project's lifecycle. A very common approach for performing quick-order-of-magnitude estimates is based on using Location Cost Adjustment Factors (LCAFs) that compute historically based costs by project location. Nowadays, numerous LCAF datasets are commercially available in North America, but, obviously, they do not include all locations. Hence, LCAFs for un-sampled locations need to be inferred through spatial interpolation or prediction methods. Currently, practitioners tend to select the value for a location using only one variable, namely the nearest linear-distance between two sites. However, construction costs could be affected by socio-economic variables as suggested by macroeconomic theories. Using a commonly used set of LCAFs, the City Cost Indexes (CCI) by RSMeans, and the socio-economic variables included in the ESRI Community Sourcebook, this article provides several contributions to the body of knowledge. First, the accuracy of various spatial prediction methods in estimating LCAF values for un-sampled locations was evaluated and assessed in respect to spatial interpolation methods. Two Regression-based prediction models were selected, a Global Regression Analysis and a Geographically-weighted regression analysis (GWR). Once these models were compared against interpolation methods, the results showed that GWR is the most appropriate way to model CCI as a function of multiple covariates. The outcome of GWR, for each covariate, was studied for all the 48 states in the contiguous US. As a direct consequence of spatial non-stationarity, it was possible to discuss the influence of each single covariate differently from state to state. In addition, the article includes a first attempt to determine if the observed variability in cost index values could be, at least partially explained by independent socio-economic variables. PMID:25018582
Optimization of the oxidant supply system for combined cycle MHD power plants
NASA Technical Reports Server (NTRS)
Juhasz, A. J.
1982-01-01
An in-depth study was conducted to determine what, if any, improvements could be made on the oxidant supply system for combined cycle MHD power plants which could be reflected in higher thermal efficiency and a reduction in the cost of electricity, COE. A systematic analysis of air separation process varitions which showed that the specific energy consumption could be minimized when the product stream oxygen concentration is about 70 mole percent was conducted. The use of advanced air compressors, having variable speed and guide vane position control, results in additional power savings. The study also led to the conceptual design of a new air separation process, sized for a 500 MW sub e MHD plant, referred to a internal compression is discussed. In addition to its lower overall energy consumption, potential capital cost savings were identified for air separation plants using this process when constructed in a single large air separation train rather than multiple parallel trains, typical of conventional practice.
A simulation model of hospital management based on cost accounting analysis according to disease.
Tanaka, Koji; Sato, Junzo; Guo, Jinqiu; Takada, Akira; Yoshihara, Hiroyuki
2004-12-01
Since a little before 2000, hospital cost accounting has been increasingly performed at Japanese national university hospitals. At Kumamoto University Hospital, for instance, departmental costs have been analyzed since 2000. And, since 2003, the cost balance has been obtained according to certain diseases for the preparation of Diagnosis-Related Groups and Prospective Payment System. On the basis of these experiences, we have constructed a simulation model of hospital management. This program has worked correctly at repeated trials and with satisfactory speed. Although there has been room for improvement of detailed accounts and cost accounting engine, the basic model has proved satisfactory. We have constructed a hospital management model based on the financial data of an existing hospital. We will later improve this program from the viewpoint of construction and using more various data of hospital management. A prospective outlook may be obtained for the practical application of this hospital management model.
Comparative Effectiveness Research in Oncology
2013-01-01
Although randomized controlled trials represent the gold standard for comparative effective research (CER), a number of additional methods are available when randomized controlled trials are lacking or inconclusive because of the limitations of such trials. In addition to more relevant, efficient, and generalizable trials, there is a need for additional approaches utilizing rigorous methodology while fully recognizing their inherent limitations. CER is an important construct for defining and summarizing evidence on effectiveness and safety and comparing the value of competing strategies so that patients, providers, and policymakers can be offered appropriate recommendations for optimal patient care. Nevertheless, methodological as well as political and social challenges for CER remain. CER requires constant and sophisticated methodological oversight of study design and analysis similar to that required for randomized trials to reduce the potential for bias. At the same time, if appropriately conducted, CER offers an opportunity to identify the most effective and safe approach to patient care. Despite rising and unsustainable increases in health care costs, an even greater challenge to the implementation of CER arises from the social and political environment questioning the very motives and goals of CER. Oncologists and oncology professional societies are uniquely positioned to provide informed clinical and methodological expertise to steer the appropriate application of CER toward critical discussions related to health care costs, cost-effectiveness, and the comparative value of the available options for appropriate care of patients with cancer. PMID:23697601
Fuel weight and removal costs in fuel-break construction
James L. Murphy
1966-01-01
Three major fuel types were sampled during fuel-break construction on the west side of the Sierra Nevada, California. Fuel weight per acre ranged from 12.2. to 420.6 tons per acre on average. Fuel-break construction removed 27.9 to 40.5 percent of teh total fuel; costs ranged from $141.29 to $148.38 per acre and $1.16 to $4.43 per ton.
1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.
1981-02-02
7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of
Prioritizing prevention opportunities in the Washington State construction industry, 2003-2007.
Schoonover, Todd; Bonauto, David; Silverstein, Barbara; Adams, Darrin; Clark, Randy
2010-06-01
This study compares construction industry groups in Washington State by injury severity and cost, and ranks industry groups according to potential for prevention. All Washington State workers' compensation compensable claims with date of injury between 2003 and 2007 were classified into North American Industrial Classification System (NAICS) industry groups. Claims were then aggregated by injury type and industry groups were ranked according to a prevention index (PI). The PI is the average of the rank orders of the claim count and the claim incidence rate. A lower PI indicates a higher need for prevention activities. The severity rate was calculated as the number of days of time loss per 10,000 full-time equivalents (FTEs). For all injury types, construction industry groups occupy 7 of the top 15 PI ranks in Washington State. The severity rate among construction industry groups was twice that for non-construction groups for all injury types. Foundation, structure, and building exterior contractors (NAICS 2381) ranked highest in prevention potential and severity among construction industry groups for most common injury types including falls from elevation, fall on same level, struck by/against, and musculo-skeletal disorders of the neck, back, and upper extremity (WMSDs). Median claim costs by injury type were generally higher among construction industry groups. The construction industry in Washington State has a high severity rate and potential for prevention. The methods used for characterizing these industry groups can be adapted for comparison within and between other industries and states. These data can be used by industry groups and employers to identify higher cost and higher severity injury types. Knowledge about the relative frequencies and costs associated with different injury types will help employers and construction industry associations make better informed decisions about where prevention efforts are most needed and may have the greatest impact. The results of this study can also be used by industry stakeholders to cooperatively focus on high cost and high severity injuries and explore best practices, interventions, and solutions as demonstrated by efforts to prevent musculoskeletal disorders in masonry (Entzel, Albers, & Welch, 2007). Initiating construction industry groups to focus on high cost and high severity injuries may also help prevent other types of injuries. (c) 2010 National Safety Council. Published by Elsevier Ltd. All rights reserved.
Optimal transfers between unstable periodic orbits using invariant manifolds
NASA Astrophysics Data System (ADS)
Davis, Kathryn E.; Anderson, Rodney L.; Scheeres, Daniel J.; Born, George H.
2011-03-01
This paper presents a method to construct optimal transfers between unstable periodic orbits of differing energies using invariant manifolds. The transfers constructed in this method asymptotically depart the initial orbit on a trajectory contained within the unstable manifold of the initial orbit and later, asymptotically arrive at the final orbit on a trajectory contained within the stable manifold of the final orbit. Primer vector theory is applied to a transfer to determine the optimal maneuvers required to create the bridging trajectory that connects the unstable and stable manifold trajectories. Transfers are constructed between unstable periodic orbits in the Sun-Earth, Earth-Moon, and Jupiter-Europa three-body systems. Multiple solutions are found between the same initial and final orbits, where certain solutions retrace interior portions of the trajectory. All transfers created satisfy the conditions for optimality. The costs of transfers constructed using manifolds are compared to the costs of transfers constructed without the use of manifolds. In all cases, the total cost of the transfer is significantly lower when invariant manifolds are used in the transfer construction. In many cases, the transfers that employ invariant manifolds are three times more efficient, in terms of fuel expenditure, than the transfer that do not. The decrease in transfer cost is accompanied by an increase in transfer time of flight.
Probabilistic Cost-Effectiveness Analysis of Vaccination for Mild or Moderate Alzheimer's Disease.
Yang, Kuen-Cheh; Chen, Hsiu-Hsi
2016-01-01
Studies on the immunotherapy for Alzheimer's disease (AD) have increasingly gained attention since 1990s. However, there are pros (preventing of AD) and cons (incurred cost and side effects) regarding the administration of immunotherapy. Up to date, there has been lacking of economic evaluation for immunotherapy of AD. We aimed to assess the cost-effectiveness analysis of the vaccination for AD. A meta-analysis of randomized control trials after systemic review was conducted to evaluate the efficacy of the vaccine. A Markov decision model was constructed and applied to a 120,000-Taiwanese cohort aged ≥65 years. Person years and quality-adjusted life years (QALY) were computed between the vaccinated group and the the unvaccinated group. Economic evaluation was performed to calculate the incremental cost-effectiveness ratio (ICER) and cost-effectiveness acceptability curve (CEAC). Vaccinated group gained an additional 0.84 life years and 0.56 QALYs over 10-years and an additional 0.35 life years and 0.282 QALYs over 5-years of follow-up. The vaccinated group dominated the unvaccinated group by ICER over 5-years of follow-up. The ICERs of 10-year follow-up for the vaccinated group against the unvaccinated group were $13,850 per QALY and $9,038 per life year gained. Given the threshold of $20,000 of willingness to pay (WTP), the CEAC showed the probability of being cost-effective for vaccination with QALY was 70.7% and 92% for life years gained after 10-years of follow-up. The corresponding figures were 87.3% for QALY and 93.5% for life years gained over 5-years follow-up. The vaccination for AD was cost-effective in gaining QALY and life years compared with no vaccination, under the condition of a reasonable threshold of WTP.
Biden, Scott; Smyth, Stuart J; Hudson, David
2018-01-02
Incorporating socio-economic considerations (SECs) into national biosafety regulations regarding genetically modified (GM) crops have opportunity costs. Australia approved the cultivation of GM canola through a science-based risk assessment in 2003, but allowed state moratoria to be instituted based on potential trade impacts over the period 2004 to 2008 and 2010 in the main canola growing states. This analysis constructs a counterfactual assessment using Canadian GM canola adoption data to create an S-Curve of adoption in Australia to measure the environmental and economic opportunity costs of Australia's SEC-based moratoria between 2004 and 2014. The environmental impacts are measured through the amount of chemical active ingredients applied during pest management, the Environmental Impact Quotient indicator, and greenhouse gas emissions. The economic impacts are measured through the variable costs of the weed control programs, yield and the contribution margin. The environmental opportunity costs from delaying the adoption of GM canola in Australia include an additional 6.5 million kilograms of active ingredients applied to canola land; a 14.3% increase in environmental impact to farmers, consumers and the ecology; 8.7 million litres of diesel fuel burned; and an additional 24.2 million kilograms of greenhouse gas (GHG) and compound emissions released. The economic opportunity costs of the SEC-based moratoria resulted in foregone output of 1.1 million metric tonnes of canola and a net economic loss to canola farmers' of AU$485.6 million. The paper provides some of the first quantified, post-adoption evidence on the opportunity cost and environmental impacts of incorporating SECs into GM crop regulation.
Performance and cost evaluation of constructed wetland for domestic waste water treatment.
Deeptha, V T; Sudarsan, J S; Baskar, G
2015-09-01
Root zone treatment through constructed wetlands is an engineered method of purifying wastewater. The aim of the present research was to study the potential of wetland plants Phragmites and Typha in treatment of wastewater and to compare the cost of constructed wetlands with that of conventional treatment systems. A pilot wetland unit of size 2x1x0.9 m was constructed in the campus. 3x3 rows of plants were transplanted into the pilot unit and subjected to wastewater from the hostels and other campus buildings. The raw wastewater and treated wastewater were collected periodically and tested for Total nitrogen (TN),Total Phosphorous (TP), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD). It was observed that this pilot unit reduced the concentrations of TN, TP, BOD and COD by 76, 73, 83 and 86%, respectively, on an average. Root zone system achieved standards for tertiary treatment with low operating costs, low maintenance costs, enhance the landscape, provide a natural habitat for birds, and did not emit any odour.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevron Energy Solutions; Matt Rush; Scott Shulda
Colorado Northwestern Community College (CNCC) is working collaboratively with recipient vendor Chevron Energy Solutions, an energy services company (ESCO), to develop an innovative GHP project at the new CNCC Campus constructed in 2010/2011 in Craig, Colorado. The purpose of the CNCC Craig Campus Geothermal Program scope was to utilize an energy performance contracting approach to develop a geothermal system with a shared closed-loop field providing geothermal energy to each building's GHP mechanical system. Additional benefits to the project include promoting good jobs and clean energy while reducing operating costs for the college. The project has demonstrated that GHP technology ismore » viable for new construction using the energy performance contracting model. The project also enabled the project team to evaluate several options to give the College a best value proposition for not only the initial design and construction costs but build high performance facilities that will save the College for many years to come. The design involved comparing the economic feasibility of GHP by comparing its cost to that of traditional HVAC systems via energy model, financial life cycle cost analysis of energy savings and capital cost, and finally by evaluating the compatibility of the mechanical design for GHP compared to traditional HVAC design. The project shows that GHP system design can be incorporated into the design of new commercial buildings if the design teams, architect, contractor, and owner coordinate carefully during the early phases of design. The public also benefits because the new CNCC campus is a center of education for the much of Northwestern Colorado, and students in K-12 programs (Science Spree 2010) through the CNCC two-year degree programs are already integrating geothermal and GHP technology. One of the greatest challenges met during this program was coordination of multiple engineering and development stakeholders. The leadership of Principle Investigator Pres. John Boyd of CNCC met this challenge by showing clear leadership in setting common goals and resolving conflicts early in the program.« less
Recycling of construction debris as aggregate in the Mid-Atlantic Region, USA
Robinson, G.R.; Menzie, W.D.; Hyun, H.
2004-01-01
Reclaimed asphalt pavement (RAP) and portland cement concrete (RPCC) are abundant and available substitutes for natural aggregate in many areas. This paper presents an overview of factors that affect recycled aggregate cost, availability, and engineering performance, and the results of a survey of business practices in the Mid-Atlantic region. For RAP, processing costs are less than those for virgin natural aggregate. Use of efficient asphalt pavement stripping technology, on-site reclamation, and linked two-way transport of asphalt debris and processed asphalt paving mix between asphalt mix plants and paving sites has led to extensive recycling of asphalt pavement in the Mid-Atlantic region of the US. Most of the sites that recycle asphalt pavement (RAP) are located in or near urban areas close to important transportation corridors. RPCC is a viable aggregate source in urban settings where unit costs for processed aggregate from RPCC and natural aggregate are comparable. Disposal fees charged at RPCC recycling sites help defray processing costs and the significantly lower tipping fees at recycling sites versus landfill disposal sites encourage recycling of construction debris as aggregate. Construction contractors and construction debris recycling centers, many of which have the ability to crush and process concrete debris at the job site, produce most RPCC. Production of RPCC aggregate from construction debris that is processed on site using portable equipment moved to the construction site eliminates transportation costs for aggregate and provides an economic incentive for RPCC use. Processing costs, quality and performance issues, and lack of large quantities where needed limit RPCC use. Most RPCC suppliers in the Mid-Atlantic area are located in counties with population densities greater than 400 people/km2 (1036 people/mile2) and that have high unit-value costs and limited local availability of natural aggregate. ?? 2004 Published by Elsevier B.V.
Brief Overlook on the Occupational Accidents Occurring During the Geotechnical Site Works
NASA Astrophysics Data System (ADS)
Akboğa Kale, Özge; Eskişar, Tuğba
2017-10-01
The aim of this paper is to evaluate occupational accidents reported in geotechnical site works. Variables of the accidents are categorized as the year and month of accidents, the technical codes used for defining the scope of work trades, end use and project type and cost, nature and cause of accidents, occupation of the victims and finally the cause of fatality. As a result, it is seen that the majority of victims were construction laborers or in special trade constructors who were working on a new project or new additions to an existing project. The geotechnical phase of the projects was whether excavation, landfill, sewer-water treatment, pipeline construction, commercial building or road construction. As the outcomes of the study it is evaluated that excavation, trenching and installing pipe or pile driving were the main causes of the accidents while trench collapse, struck by a falling object / projectile and wall collapse were the main causes of fatality. Moreover, it is established that more than half of the fatalities were due to asphyxia followed by fracture. These findings show that accidents occurred in geotechnical works do not only have high frequency but also high severity. This study emphasizes project specific countermeasures should be taken regarding the nature, cost and importance of the project and the occupation variabilities working on the project.
NASA Astrophysics Data System (ADS)
van Broekhuizen, Pieter; van Broekhuizen, Fleur; Cornelissen, Ralf; Reijnders, Lucas
2011-02-01
In the European construction industry in 2009, the use of engineered nanoparticles appears to be confined to a limited number of products, predominantly coatings, cement and concrete. A survey among representatives of workers and employers from 14 EU countries suggests a high level of ignorance about the availability and use of nanomaterials for the construction industry and the safety aspects thereof. Barriers for a large-scale acceptance of products containing engineered nanoparticles (nanoproducts) are high costs, uncertainties about long-term technical material performance, as well as uncertainties about health risks of nanoproducts. Workplace measurements suggest a modest exposure of construction workers to nanoparticles (NPs) associated with the use of nanoproducts. The measured particles were within a size range of 20-300 nm, with the median diameter below 53 nm. Positive assignment of this exposure to the nanoproduct or to additional sources of ultrafine particles, like the electrical equipment used was not possible within the scope of this study and requires further research. Exposures were below the nano reference values proposed on the basis of a precautionary approach.
Construction Management Meets Today's Realities.
ERIC Educational Resources Information Center
Day, C. William
1979-01-01
Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)
NASA Astrophysics Data System (ADS)
Tarmizi, H. B.; Daulay, M.; Muda, I.
2017-03-01
This study aims to test the aggregation of the economic growth of North Sumatra and the influence of the Tax on Acquisition of Land and Building to the Construction Cost Index in North Sumatra. This type of research is explanatory survey with quantitative methods. The population and the sample district in North Sumatra with the observation time series and cross sectional. The analysis tool used is multiple regression. The results showed that there was economic growth aggregation of North Sumatra and the influence of the Tax on Acquisition of Land and Building affect the Construction Cost Index.
Study and evaluation of ferro-cement for use in wind tunnel construction
NASA Technical Reports Server (NTRS)
Larsen, H. J., Jr. (Compiler)
1972-01-01
The structural suitability and cost effectiveness of ferro-cement for large subsonic wind tunnel structures is investigated. This investigation was carried out in the following four main categories: (1) a state-of-the-art survey into the uses, properties, and costs of ferro-cement; (2) an evaluation of those ferro-cement properties critical to construction of large, subsonic wind tunnels, which have not been adequately established to date; (3) a laboratory testing program to determine preliminary values for those properties; and (4) a study to establish cost factors for ferro-cement as related to a preliminary construction scheme for a nacelle and shroud unit.
The cost-effectiveness of influenza vaccination of healthy adults 50-64 years of age.
Turner, D A; Wailoo, A J; Cooper, N J; Sutton, A J; Abrams, K R; Nicholson, K G
2006-02-13
Influenza can cause significant morbidity and mortality. Influenza vaccination is an effective and safe strategy in the prevention of influenza. Currently the National Health Service (NHS) vaccinates 'at-risk' individuals only. This definition includes everyone over 65 years of age but excludes individuals 50-64 years of age unless they have an additional risk factor, such as underlying heart disease or lung disease. In order to examine the cost-effectiveness of an extension of the vaccination policy to include this age group we constructed an economic model to estimate the costs and benefits of vaccination from both a health service and a societal perspective. Data to populate the model was obtained from the literature and the outcome measure used was the quality adjusted life year (QALY). Influenza vaccination prevented an estimated 4508 cases (95% CI: 2431-7606) per 100,000 vaccinees per influenza season for a net cost to the NHS of pound653,221 (95% CI: 354,575-1,072,257). The net cost increased to pound1,139,069 (95% CI 27,052-2,030,473) when non-NHS costs were included and the estimated cost-per-QALY were pound6174 and pound10,766 for NHS and all costs respectively. Extension of the current immunisation policy has the potential to generate a significant health benefit at a comparatively low cost.
IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation.
Cassettari, Lucia; Mosca, Marco; Mosca, Roberto; Rolando, Fabio; Costa, Mauro; Pisaturo, Valerio
2016-03-01
The Authors present a new methodological approach in stochastic regime to determine the actual costs of an healthcare process. The paper specifically shows the application of the methodology for the determination of the cost of an Assisted reproductive technology (ART) treatment in Italy. The reason of this research comes from the fact that deterministic regime is inadequate to implement an accurate estimate of the cost of this particular treatment. In fact the durations of the different activities involved are unfixed and described by means of frequency distributions. Hence the need to determine in addition to the mean value of the cost, the interval within which it is intended to vary with a known confidence level. Consequently the cost obtained for each type of cycle investigated (in vitro fertilization and embryo transfer with or without intracytoplasmic sperm injection), shows tolerance intervals around the mean value sufficiently restricted as to make the data obtained statistically robust and therefore usable also as reference for any benchmark with other Countries. It should be noted that under a methodological point of view the approach was rigorous. In fact it was used both the technique of Activity Based Costing for determining the cost of individual activities of the process both the Monte Carlo simulation, with control of experimental error, for the construction of the tolerance intervals on the final result.
Impact of ICT on Performance of Construction Companies in Slovakia
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
Information and communication technologies became a part of management tools in modern companies. Construction industry and its participants deal with a serious requirement for processing the huge amount of information on construction projects including design, construction, time and cost parameters, economic efficiency and sustainability. To fulfil this requirement, companies have to use appropriate ICT tools. Aim of the paper is to examine the impact of ICT exploitation on performance of construction companies. The impact of BIM tools, ERP systems and controlling system on cost and profit indicators will be measured on the sample of 85 companies from construction industry in Slovakia. Enterprise size, enterprise ownership and role in construction process will be set as independent variables for statistical analyse. The results will be considered for different groups of companies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, Patrick; Im, Piljae
2012-04-01
Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first costmore » of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.« less
13 CFR 120.884 - Ineligible costs for 504 loans.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Construction equipment (except for heavy duty construction equipment integral to a business' operations and... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Ineligible costs for 504 loans. 120.884 Section 120.884 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS...
Lavail, Katherine Hart; Kennedy, Allison Michelle
2013-10-01
To explain vaccine confidence as it related to parents' decisions to vaccinate their children with recommended vaccines, and to develop a confidence measure to efficiently and effectively predict parents' self-reported vaccine behaviors. A sample of parents with at least one child younger than 6 years (n = 376) was analyzed using data from the HealthStyles 2010 survey. Questions were grouped into block variables to create three confidence constructs: value, safety, and efficacy. Regression equations controlling for demographic characteristics were used to identify the confidence construct(s) that best predicted parents' self-reported vaccination decisions (accept all, some, or none of the recommended childhood vaccines). Among the three constructs evaluated, confidence in the value of vaccines, that is the belief that vaccines are important and vaccinating one's children is the right thing to do, was the best predictor of parents' vaccine decisions, F(2, 351) = 119.199, p < .001. When combined into a block variable for analysis, two survey items measuring confidence in the value of vaccines accounted for 40% of the variance in parents' self-reported vaccine decisions. Confidence in the safety or efficacy of vaccines failed to account for additional significant variance in parent-reported vaccination behavior. Confidence in the value of vaccines is a helpful predictor of parent-reported vaccination behavior. Attitudinal constructs of confidence in the safety and efficacy of vaccines failed to account for additional significant variance in parents' vaccination behaviors. Future research should assess the role of vaccine knowledge and tangible barriers, such as access and cost, to further explain parents' vaccination behaviors.
NASA Astrophysics Data System (ADS)
Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris
2018-05-01
Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.
Utilisation of Waste Marble Dust as Fine Aggregate in Concrete
NASA Astrophysics Data System (ADS)
Vigneshpandian, G. V.; Aparna Shruthi, E.; Venkatasubramanian, C.; Muthu, D.
2017-07-01
Concrete is the important construction material and it is used in the construction industry due to its high compressive strength and its durability. Now a day’s various studies have been conducted to make concrete with waste material with the intention of reducing cost and unavailability of conventional materials. This paper investigates the strength properties of concrete specimens cast using waste marble dust as replacement of fine aggregate. The marble pieces are finely crushed to powdered and the gradation is compared with conventional fine aggregate. Concrete specimen were cast using wmd in the laboratory with different proportion (25%, 50% and 100%) by weight of cement and from the studies it reveals that addition of waste marble dust as a replacement of fine aggregate marginally improves compressive, tensile and flexural strength in concrete.
CT image segmentation methods for bone used in medical additive manufacturing.
van Eijnatten, Maureen; van Dijk, Roelof; Dobbe, Johannes; Streekstra, Geert; Koivisto, Juha; Wolff, Jan
2018-01-01
The accuracy of additive manufactured medical constructs is limited by errors introduced during image segmentation. The aim of this study was to review the existing literature on different image segmentation methods used in medical additive manufacturing. Thirty-two publications that reported on the accuracy of bone segmentation based on computed tomography images were identified using PubMed, ScienceDirect, Scopus, and Google Scholar. The advantages and disadvantages of the different segmentation methods used in these studies were evaluated and reported accuracies were compared. The spread between the reported accuracies was large (0.04 mm - 1.9 mm). Global thresholding was the most commonly used segmentation method with accuracies under 0.6 mm. The disadvantage of this method is the extensive manual post-processing required. Advanced thresholding methods could improve the accuracy to under 0.38 mm. However, such methods are currently not included in commercial software packages. Statistical shape model methods resulted in accuracies from 0.25 mm to 1.9 mm but are only suitable for anatomical structures with moderate anatomical variations. Thresholding remains the most widely used segmentation method in medical additive manufacturing. To improve the accuracy and reduce the costs of patient-specific additive manufactured constructs, more advanced segmentation methods are required. Copyright © 2017 IPEM. Published by Elsevier Ltd. All rights reserved.
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
Cost Analysis of Leed Certified United States Navy Buildings
2011-08-03
be accumulated in order to offset initial investment costs - St = Savings in operational costs in year t associated with a given alternative - ∆I0...ior Non-Structural Elements er.o• 2 1 Construction Waste ManagenMnt Oivort 50% fro m Disposal Crocllt 22 Construction Waste Managemen t , Divert 75... Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302. Respondents should be aware that notwithstanding
75 FR 1403 - Notice of Proposed Information Collection for 1004-0102
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
... to pay private landowners for the use and/or maintenance of their roads. These fees represent the BLM's share of road construction and maintenance costs under reciprocal right-of-way agreements between... contract, and to amortize road construction and maintenance costs among several road users. Frequency of...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Title I preliminary engineering for: A. S. E. F. solid waste to methane gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-01-01
An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
Code of Federal Regulations, 2014 CFR
2014-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Space Construction System Analysis. Part 2: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
A detailed, end-to-end analysis of the activities, techniques, equipment and Shuttle provisions required to construct a reference project system is described. Included are: platform definition; construction analysis; cost and programmatics; and space construction experiments concepts.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), pre-architectural programming, architectural design, preservation, construction, administration, construction management, or project management costs. Construction does not include the purchase of land. [61... U.S.C. 450b(e). (e) Construction means the erection, acquisition, renovation, repair, remodeling, or...
Construction Management: Building Schools Faster in the International Marketplace
ERIC Educational Resources Information Center
Scarano, Joseph J.
1976-01-01
Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)
Assessing the cost of a cardiology residency program with a cost construction model.
Franzini, L; Chen, S C; McGhie, A I; Low, M D
1999-09-01
Although the total costs of graduate medical education are difficult to quantify, this information is of great importance in planning over the next decade. A cost construction model was used to quantify the costs of teaching faculty, cardiology fellows' salaries and benefits, overhead (physical plant, equipment, and support staff), and other costs associated with the cardiology residency program at the University of Texas-Houston during the 1996 to 1997 academic year. Surveys of cardiology faculty and fellows, checked by the program director, were conducted to determine the time spent in teaching activities; access to institutional and departmental financial records was obtained to quantify associated costs. The model was then developed and examined for a range of assumptions concerning cardiology fellows' productivity, replacement costs, and the cost allocation of activities jointly producing clinical care and education. The instructional cost of training (cost of didactic, direct clinical supervision, preparation for teaching, and teaching-related administration, plus the support of the teaching program) was estimated at $73,939 per cardiology fellow per year. This cost was less than the estimated replacement value of the teaching and clinical services provided by cardiology fellows, $100,937 per cardiology fellow per year. Sensitivity analysis, with different assumptions on cardiology fellows' productivity and replacement costs, varied the cost estimates but generally represented the cardiology residency program as an asset. Cost construction models can be used as a tool to estimate variations in resource requirements resulting from changes in curriculum or educators' costs. In this residency, the value of the teaching and clinical services provided by cardiology fellows exceeded the cost of the resources used in the educational program.
NASA Astrophysics Data System (ADS)
Lilliestam, Johan; Labordena, Mercè; Patt, Anthony; Pfenninger, Stefan
2017-07-01
Concentrating solar power (CSP) capacity has expanded slower than other renewable technologies and its costs are still high. Until now, there have been too few CSP projects to derive robust conclusions about its cost development. Here we present an empirical study of the cost development of all operating CSP stations and those under construction, examining the roles of capacity growth, industry continuity, and policy support design. We identify distinct CSP expansion phases, each characterized by different cost pressure in the policy regime and different industry continuity. In 2008-2011, with low cost pressure and following industry discontinuity, costs increased. In the current phase, with high cost pressure and continuous industry development, costs decreased rapidly, with learning rates exceeding 20%. Data for projects under construction suggest that this trend is continuing and accelerating. If support policies and industrial structure are sustained, we see no near-term factors that would hinder further cost decreases.
Bérard, A; Bréchat, P-H; Rymer, R; Londsdorfer, J
2009-02-01
According to the framework legislation promulgated as part of the reform of finance laws in France, quality is a mandatory feature of all governmental actions. In this context, this work was conducted to assess the construction cost of a national health program designed to promote physical and sports activities and prevent doping behaviors. This program was considered to have the characteristic features of a successful governmental health intervention. Four cost categories were evaluated: cost of the activity itself, transportation costs, communication costs and promotion costs. It was found that the program costs for 2002-2007 were 100,000 euro, with 15% of the costs in the communication category. Economic elements could be associated with factors of successful health service interventions in order to help decision makers responsible for the public interest and the consistency of public health actions.
24 CFR 242.52 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-04-01
...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...
Macario, Everly; Hannon, Sandra Wills; Baker, Robin; Branche, Christine M; Trahan, Christina
2015-08-01
Falls are the leading cause of fatalities in construction. The Safety Pays, Falls Cost campaign aims to prevent falls in residential construction. A critical component of our social marketing approach was to involve 70 partners in reaching target audiences. We assessed partner engagement April 2012-August 2013 through: (1) baseline partnership quality interviews (eight partners); (2) pre-/post-partner "market" readiness in-depth interviews (three partners); (3) a pre-/post- (29/31 partners) online partner engagement survey; and (4) standardized metrics to measure partner activity. We found a high level of interest and engagement that increased with the addition of prompting to action through regular communication and new resources from organizers and formation of local partnerships that were able to tailor their activities to their own communities or regions. It is feasible to leverage government-labor-management partnerships that enjoy trust among target audiences to widely disseminate campaign materials and messages. © 2015 Wiley Periodicals, Inc.
Monitoring the petroleum bitumen characteristics changes during their interaction with the polymers
NASA Astrophysics Data System (ADS)
Belyaev, P. S.; Mishchenko, S. V.; Belyaev, V. P.; Frolov, V. A.
2017-08-01
The subject of the study is the characteristics (penetration, softening temperature, ductility and elasticity) of a road binder based on petroleum bitumen. The work purpose is to monitor the changes in the characteristics of petroleum bitumen when it interacting with polymers: thermoplastic elastomer, low-density polyethylene, including the adhesive additive presence. To carry out the research a special laboratory facility was designed and manufactured with two blade mixers providing intensive turbulent mixing and the possibility to effect on the transition process of combining the components in a polymer-bitumen binder. To construct a mathematical model of the polymer-bitumen binder characteristics dependence from the composition, methods of statistical experiments planning were used. The possibility of the expensive thermoplastic elastomers replacement with polyethylene is established while maintaining acceptable polymer-bitumen binder quality parameters. The obtained results are proposed for use in road construction. They allow to reduce the roads construction cost with solving the problem of recycling long-term waste packaging from polyethylene.
Economic assessment of the construction industry: A construction-economics nexus
NASA Astrophysics Data System (ADS)
Barber, Herbert Marion, Jr.
The purpose of this study was to conduct an economic assessment of the construction industry. More specifically, this study addresses ambiguities within the literature that are associated with the construction-economics nexus. The researcher 1) investigated the relationships between economic indicators and stock prices of U.S. construction equipment manufacturers, 2) investigated the relationships between energy production, consumption, and corruption, and 3) determined the economic effect electricity generation and electricity consumption has on economies of scale. The researcher used descriptive and inferential statistics in this study and determined that economists, researchers, policy-makers, and others should have predicted the 2007-08 world economic collapse 5-6 years prior to realization of the event given that construction indices and GDP grossly regressed from statistically acceptable trends as early as 2002 and perhaps 2000. Substantiating this claim, the effect of the cost of construction materials and labor, i.e. construction index, on GDP was significant for years leading up to the collapse (1970-2007). Additionally, it was determined that energy production and consumption are predictors of governmental corruption in some countries. In the Republic of Botswana, for example, the researcher determined that energy production and consumption statistically jointly effected governmental corruption. In addition to determining statistical effect, a model for predicting governmental corruption was developed based on energy production and consumption volumes. Also, the researcher found that electricity generation in the 25 largest world economies had a statistically significant effect on GDP. Electricity consumption also had an effect on GDP, as well, but not on other economic indicators. More importantly than the quantitative findings, the researcher concluded that the construction-economics nexus is far more complex than most policy-makers realize. As such, infrastructure spending may, or may not, be an answer to the current world economic collapse, as much more research remains to be completed by researchers to address known ambiguities within various associated findings. Until a collective agreement can be reached among researchers as to the effect that construction spending has on economic output under known, specific parameters, policy-makers should exercise extreme caution when leveraging infrastructure spending as a solution for overcoming the world economic collapse.
Lévesque, Renee; Marcelli, Daniele; Cardinal, Héloïse; Caron, Marie-Line; Grooteman, Muriel P C; Bots, Michiel L; Blankestijn, Peter J; Nubé, Menso J; Grassmann, Aileen; Canaud, Bernard; Gandjour, Afschin
2015-12-01
The aim of this study was to assess the cost effectiveness of high-efficiency on-line hemodiafiltration (OL-HDF) compared with low-flux hemodialysis (LF-HD) for patients with end-stage renal disease (ESRD) based on the Canadian (Centre Hospitalier de l'Université de Montréal) arm of a parallel-group randomized controlled trial (RCT), the CONvective TRAnsport STudy. An economic evaluation was conducted for the period of the RCT (74 months). In addition, a Markov state transition model was constructed to simulate costs and health benefits over lifetime. The primary outcome was costs per quality-adjusted life-year (QALY) gained. The analysis had the perspective of the Quebec public healthcare system. A total of 130 patients were randomly allocated to OL-HDF (n = 67) and LF-HD (n = 63). The cost-utility ratio of OL-HDF versus LF-HD was Can$53,270 per QALY gained over lifetime. This ratio was fairly robust in the sensitivity analysis. The cost-utility ratio was lower than that of LF-HD compared with no treatment (immediate death), which was Can$93,008 per QALY gained. High-efficiency OL-HDF can be considered a cost-effective treatment for ESRD in a Canadian setting. Further research is needed to assess cost effectiveness in other settings and healthcare systems.
Final Report- Local Energy Matters: Solar Development in Duluth, Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Slick, Jodi Lyn
The Local Energy Matters project advanced solar deployment in the City of Duluth, MN- a cold-climate community of 86,000. At the beginning of the project, Duluth had 254.57 kW installed solar capacity with an average cost of 5.04 USD/watt installed in 2014. The project worked with cross-sector stakeholders to benchmark the current market, implement best practices for solar deployment and soft cost reduction, develop pilot deployment programs in residential rooftop, community solar, and commercial/industrial sectors, work with the City of Duluth to determine appropriate sites for utility scale developments, and demonstrate solar pus storage. Over the three years of themore » project, Duluth’s installed residential and commercial solar capacity grew by 344% to 875.9 kW with an additional 702 kW solar garden capacity subscribed by Duluth residents, businesses, and institutions. Installation costs dropped 48% over this timeframe to 4.08 USD/watt installed (exclusive of solar garden construction). This report documents the process used to identify levers for increased solar installation and cost reductions in a nascent cold-climate solar market.« less
NASA Technical Reports Server (NTRS)
1976-01-01
Ten advanced energy conversion systems for central-station, based-load electric power generation using coal and coal-derived fuels which were studied by NASA are presented. Various contractors were selected by competitive bidding to study these systems. A comparative evaluation is provided of the contractor results on both a system-by-system and an overall basis. Ground rules specified by NASA, such as coal specifications, fuel costs, labor costs, method of cost comparison, escalation and interest during construction, fixed charges, emission standards, and environmental conditions, are presented. Each system discussion includes the potential advantages of the system, the scope of each contractor's analysis, typical schematics of systems, comparison of cost of electricity and efficiency for each contractor, identification and reconciliation of differences, identification of future improvements, and discussion of outside comments. Considerations common to all systems, such as materials and furnaces, are also discussed. Results of selected in-house analyses are presented, in addition to contractor data. The results for all systems are then compared.
Can hybrid solar-fossil power plants mitigate CO2 at lower cost than PV or CSP?
Moore, Jared; Apt, Jay
2013-03-19
Fifteen of the United States and several nations require a portion of their electricity come from solar energy. We perform an engineering-economic analysis of hybridizing concentrating solar thermal power with fossil fuel in an Integrated Solar Combined Cycle (ISCC) generator. We construct a thermodynamic model of an ISCC plant in order to examine how much solar and fossil electricity is produced and how such a power plant would operate, given hourly solar resource data and hourly electricity prices. We find that the solar portion of an ISCC power plant has a lower levelized cost of electricity than stand-alone solar power plants given strong solar resource in the US southwest and market conditions that allow the capacity factor of the solar portion of the power plant to be above 21%. From a local government perspective, current federal subsidies distort the levelized cost of electricity such that photovoltaic electricity is slightly less expensive than the solar electricity produced by the ISCC. However, if the cost of variability and additional transmission lines needed for stand-alone solar power plants are taken into account, the solar portion of an ISCC power plant may be more cost-effective.
Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives
NASA Astrophysics Data System (ADS)
Sanabria, Orlando
Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.
Multiple mini-interviews: same concept, different approaches.
Knorr, Mirjana; Hissbach, Johanna
2014-12-01
Increasing numbers of educational institutions in the medical field choose to replace their conventional admissions interviews with a multiple mini-interview (MMI) format because the latter has superior reliability values and reduces interviewer bias. As the MMI format can be adapted to the conditions of each institution, the question of under which circumstances an MMI is most expedient remains unresolved. This article systematically reviews the existing MMI literature to identify the aspects of MMI design that have impact on the reliability, validity and cost-efficiency of the format. Three electronic databases (OVID, PubMed, Web of Science) were searched for any publications in which MMIs and related approaches were discussed. Sixty-six publications were included in the analysis. Forty studies reported reliability values. Generally, raising the number of stations has more impact on reliability than raising the number of raters per station. Other factors with positive influence include the exclusion of stations that are too easy, and the use of normative anchored rating scales or skills-based rater training. Data on criterion-related validities and analyses of dimensionality were found in 31 studies. Irrespective of design differences, the relationship between MMI results and academic measures is small to zero. The McMaster University MMI predicts in-programme and licensing examination performance. Construct validity analyses are mostly exploratory and their results are inconclusive. Seven publications gave information on required resources or provided suggestions on how to save costs. The most relevant cost factors that are additional to those of conventional interviews are the costs of station development and actor payments. The MMI literature provides useful recommendations for reliable and cost-efficient MMI designs, but some important aspects have not yet been fully explored. More theory-driven research is needed concerning dimensionality and construct validity, the predictive validity of MMIs other than those of McMaster University, the comparison of station types, and a cost-efficient station development process. © 2014 John Wiley & Sons Ltd.
Parkin, D.; Jacoby, A.; McNamee, P.; Miller, P.; Thomas, S.; Bates, D.
2000-01-01
OBJECTIVE—To evaluate the cost-effectiveness of interferon beta-1b (IFβ-1b) for relapsing-remitting multiple sclerosis (RRMS). METHODS—Construction of a cost-effectiveness model using published data on IFβ-1b effectiveness and the natural history of RRMS, and new data on costs and quality of life (QoL) from a sample of 102patients with RRMS and resident in northern England. RESULTS—Poorer QoL was found for patients with multiple sclerosis compared with the general population; those who had had a relapse; those with worse states identified by a clinical measure (expanded disability status scale (EDSS)). Relapses have effects over several months. Health state valuations were higher than in the general population. Costs were higher in relapse than remission and for worse EDSS states. IFβ-1b costs were larger than cost savings. The best cost-effectiveness estimate was £28 700 per relapse avoided, which is £809 900 per QALY gained; or £328 300 per QALY gained allowing for effects of progression over 5 years. Estimates were robust to changes in assumptions. CONCLUSIONS—The impact of multiple sclerosis on QoL is substantial. Future trials should base outcomes measurement on QoL and be better linked to natural history and cost data. IFβ-1b produces important occasional short term QoL gains, but small gains in QALYs overall and large additional costs. PMID:10644777
Study of Subway Station Design and Construction
DOT National Transportation Integrated Search
1977-03-01
Due to the high cost of urban underground transit construction in recent years, construction practices used in other countries were reviewed to determine if construction methods which are commonly accepted there might be adapted to U.S. practice. Des...
Francis, Tittu; Washington, Travis; Srivastava, Karan; Moutzouros, Vasilios; Makhni, Eric C; Hakeos, William
2017-11-01
Tension band wiring (TBW) and locked plating are common treatment options for Mayo IIA olecranon fractures. Clinical trials have shown excellent functional outcomes with both techniques. Although TBW implants are significantly less expensive than a locked olecranon plate, TBW often requires an additional operation for implant removal. To choose the most cost-effective treatment strategy, surgeons must understand how implant costs and return to the operating room influence the most cost-effective strategy. This cost-effective analysis study explored the optimal treatment strategies by using decision analysis tools. An expected-value decision tree was constructed to estimate costs based on the 2 implant choices. Values for critical variables, such as implant removal rate, were obtained from the literature. A Monte Carlo simulation consisting of 100,000 trials was used to incorporate variability in medical costs and implant removal rates. Sensitivity analysis and strategy tables were used to show how different variables influence the most cost-effective strategy. TBW was the most cost-effective strategy, with a cost savings of approximately $1300. TBW was also the dominant strategy by being the most cost-effective solution in 63% of the Monte Carlo trials. Sensitivity analysis identified implant costs for plate fixation and surgical costs for implant removal as the most sensitive parameters influencing the cost-effective strategy. Strategy tables showed the most cost-effective solution as 2 parameters vary simultaneously. TBW is the most cost-effective strategy in treating Mayo IIA olecranon fractures despite a higher rate of return to the operating room. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.
Key issues for low-cost FGD installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
DePriest, W.; Mazurek, J.M.
1995-12-01
This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.
NASA Astrophysics Data System (ADS)
Beliakov, Sergei
2018-03-01
Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.
Academic Building Systems. A Technique to Maximize Control of Construction Costs.
ERIC Educational Resources Information Center
Clark, Donald H.
1972-01-01
Academic Building Systems (ABS) is an architectural planning and design method which allows the construction owner to respond to the need for less expensive structures, economically adaptable to the changing conditions of the academic world, by providing the owner with the maximum controls over the variable cost factors in educational facility…
Cost, production and effectiveness of masticated fireline.
Elizabeth Dodson; Dana Mitchell
2016-01-01
Fire managers are continuously looking for improved methods to construct fireline with minimal resource damage. One option for fireline construction that has so far received limited attention is the use of mastication equipment. This study evaluated a masticating disk mounted on a self-leveling feller- buncher for the cost, speed, and adherence to fireline...
Ground water contaminated with TCE is commonly treated with a passive reactive barrier (PRB) constructed with zero-valence iron. The cost of iron as the reactive matrix has driven a search for less costly alternatives, and composted plant mulch has been used as an alternative re...
EFFECTIVE REMOVAL OF TCE IN A LABORATORY MODEL OF A PRB CONSTRUCTED WITH PLANT MULCH
Ground water contaminated with TCE is commonly treated with a permeable reactive barrier (PRB) constructed with zero-valence iron. The cost of iron as the reactive matrix has driven a search for less costly alternatives, and composted plant mulch has been used as an alternative ...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2013 CFR
2013-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2011 CFR
2011-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2012 CFR
2012-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
48 CFR 852.236-82 - Payments under fixed-price construction contracts (without NAS).
Code of Federal Regulations, 2014 CFR
2014-10-01
... “Network Analysis System (NAS).” Payments Under Fixed-Price Construction Contracts (APR 1984) The clause..., as applied to each branch, shall equal the total cost of such branch. The total cost of all branches... readily available for inspection and inventory by the resident engineer. (4) Such materials and/or...
Simons, Pascale A M; Ramaekers, Bram; Hoebers, Frank; Kross, Kenneth W; Marneffe, Wim; Pijls-Johannesma, Madelon; Vandijck, Dominique
2015-07-01
Compared with new technologies, the redesign of care processes is generally considered less attractive to improve patient outcomes. Nevertheless, it might result in better patient outcomes, without further increasing costs. Because early initiation of treatment is of vital importance for patients with head and neck cancer (HNC), these care processes were redesigned. This study aimed to assess patient outcomes and cost-effectiveness of this redesign. An economic (Markov) model was constructed to evaluate the biopsy process of suspicious lesion under local instead of general anesthesia, and combining computed tomography and positron emission tomography for diagnostics and radiotherapy planning. Patients treated for HNC were included in the model stratified by disease location (larynx, oropharynx, hypopharynx, and oral cavity) and stage (I-II and III-IV). Probabilistic sensitivity analyses were performed. Waiting time before treatment start reduced from 5 to 22 days for the included patient groups, resulting in 0.13 to 0.66 additional quality-adjusted life-years. The new workflow was cost-effective for all the included patient groups, using a ceiling ratio of €80,000 or €20,000. For patients treated for tumors located at the larynx and oral cavity, the new workflow resulted in additional quality-adjusted life-years, and costs decreased compared with the regular workflow. The health care payer benefited €14.1 million and €91.5 million, respectively, when individual net monetary benefits were extrapolated to an organizational level and a national level. The redesigned care process reduced the waiting time for the treatment of patients with HNC and proved cost-effective. Because care improved, implementation on a wider scale should be considered. Copyright © 2015 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.
Pine, Michael; Sonneborn, Mark; Schindler, Joe; Stanek, Michael; Maeda, Jared Lane; Hanlon, Carrie
2012-01-01
The imperative to achieve quality improvement and cost-containment goals is driving healthcare organizations to make better use of existing health information. One strategy, the construction of hybrid data sets combining clinical and administrative data, has strong potential to improve the cost-effectiveness of hospital quality reporting processes, improve the accuracy of quality measures and rankings, and strengthen data systems. Through a two-year contract with the Agency for Healthcare Research and Quality, the Minnesota Hospital Association launched a pilot project in 2007 to link hospital clinical information to administrative data. Despite some initial challenges, this project was successful. Results showed that the use of hybrid data allowed for more accurate comparisons of risk-adjusted mortality and risk-adjusted complications across Minnesota hospitals. These increases in accuracy represent an important step toward targeting quality improvement efforts in Minnesota and provide important lessons that are being leveraged through ongoing projects to construct additional enhanced data sets. We explore the implementation challenges experienced during the Minnesota Pilot Project and their implications for hospitals pursuing similar data-enhancement projects. We also highlight the key lessons learned from the pilot project's success.
BMP COST ANALYSIS FOR SOURCE WATER PROTECTION
Cost equations are developed to estimate capital, and operations and maintenance (O&M) costs for commonly used best management practices (BMPs). Total BMP volume and/or surface area is used to predict these costs. Engineering News Record (ENR) construction cost index was used t...
Code of Federal Regulations, 2014 CFR
2014-01-01
... applicable) acquisition costs, construction costs, and other costs capitalized in accordance with GAAP. (2... party); or claims reimbursement of actual interest cost at a rate available via such a transaction. (4) The non-Federal entity limits claims for Federal reimbursement of interest costs to the least...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
40 CFR 35.940-1 - Allowable project costs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Allowable project costs. 35.940-1... Allowable project costs. Allowable costs include: (a) Costs of salaries, benefits, and expendable material the grantee incurs for the project, except as provided in § 35.940-2(g); (b) Costs under construction...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
18 CFR 4.3 - Report on project cost.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2011 CFR
2011-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2014 CFR
2014-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2013 CFR
2013-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
25 CFR Appendix D to Subpart C - Cost To Construct
Code of Federal Regulations, 2010 CFR
2010-04-01
... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed and...
Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data
NASA Technical Reports Server (NTRS)
1977-01-01
Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.
A Departmental Cost-Effectiveness Model.
ERIC Educational Resources Information Center
Holleman, Thomas, Jr.
In establishing a departmental cost-effectiveness model, the traditional cost-effectiveness model was discussed and equipped with a distant and deflation equation for both benefits and costs. Next, the economics of costing was examined and program costing procedures developed. Then, the model construct was described as it was structured around the…
Research of cost aspects of cement pavements construction
NASA Astrophysics Data System (ADS)
Bezuglyi, Artem; Illiash, Sergii; Tymoshchuk, Oleksandr
2017-09-01
The tendency to increasing traffic volume on public roads and to increased axle loads of vehicles makes the road scientists to develop scientifically justified methods for preserving the existing and developing the new transport network of Ukraine. One of the options for solving such issues is the construction of roads with rigid (cement concrete) pavement. However, any solution must be justified considering technical and economic components. This paper presents the results of the research of cost aspects of cement pavements construction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.
Model of investment appraisal of high-rise construction with account of cost of land resources
NASA Astrophysics Data System (ADS)
Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya
2018-03-01
The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.
24 CFR 242.15 - Limitation on refinancing existing indebtedness.
Code of Federal Regulations, 2013 CFR
2013-04-01
... section 242-insured loan; however, the hard costs of construction and equipment must represent at least 20... no requirement for hard costs. However, if there are hard costs, such costs must total less than 20...
24 CFR 242.15 - Limitation on refinancing existing indebtedness.
Code of Federal Regulations, 2014 CFR
2014-04-01
... section 242-insured loan; however, the hard costs of construction and equipment must represent at least 20... no requirement for hard costs. However, if there are hard costs, such costs must total less than 20...
Synthesis on construction unit cost development : technical report.
DOT National Transportation Integrated Search
2009-01-01
Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...
36 CFR 223.41 - Payment when purchaser elects government road construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... government road construction. 223.41 Section 223.41 Parks, Forests, and Public Property FOREST SERVICE... Conditions and Provisions § 223.41 Payment when purchaser elects government road construction. Each contract having a provision for construction of specified roads with total estimated construction costs of $50,000...
Benefit Evaluation of Implementing BIM in Construction Projects
NASA Astrophysics Data System (ADS)
Chou, Hui-Yu; Chen, Pei-Yu
2017-10-01
Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.
Modelling of project cash flow on construction projects in Malang city
NASA Astrophysics Data System (ADS)
Djatmiko, Bambang
2017-09-01
Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
1990-11-01
As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, compliance and enforcement activities related to local and state building codes for existing and new construction were evaluated in two case studies. The analysis of the City of San Francisco's Residential Energy Conservation Ordinance (RECO) showed that a limited, prescriptive energy conservation ordinance for existing residential construction can be enforced relatively easily with little administrative costs, and that compliance with such ordinances can be quite high. Compliance with the code was facilitated by extensive publicity, an informed public concerned with the cost of energy and knowledgeablemore » about energy efficiency, the threat of punishment (Order of Abatement), the use of private inspectors, and training workshops for City and private inspectors. The analysis of California's Title 24 Standards for new residential and commercial construction showed that enforcement of this type of code for many climate zones is more complex and requires extensive administrative support for education and training of inspectors, architects, engineers, and builders. Under this code, prescriptive and performance approaches for compliance are permitted, resulting in the demand for alternative methods of enforcement: technical assistance, plan review, field inspection, and computer analysis. In contrast to existing construction, building design and new materials and construction practices are of critical importance in new construction, creating a need for extensive technical assistance and extensive interaction between enforcement personnel and the building community. Compliance problems associated with building design and installation did occur in both residential and nonresidential buildings. Because statewide codes are enforced by local officials, these problems may increase over time as energy standards change and become more complex and as other standards (eg, health and safety codes) remain a higher priority. The California Energy Commission realizes that code enforcement by itself is insufficient and expects that additional educational and technical assistance efforts (eg, manuals, training programs, and toll-free telephone lines) will ameliorate these problems.« less