Results of hydrologic monitoring on landslide-prone coastal bluffs near Mukilteo, Washington
Smith, Joel B.; Baum, Rex L.; Mirus, Benjamin B.; Michel, Abigail R.; Stark, Ben
2017-08-31
A hydrologic monitoring network was installed to investigate landslide hazards affecting the railway corridor along the eastern shore of Puget Sound between Seattle and Everett, near Mukilteo, Washington. During the summer of 2015, the U.S. Geological Survey installed monitoring equipment at four sites equipped with instrumentation to measure rainfall and air temperature every 15 minutes. Two of the four sites are installed on contrasting coastal bluffs, one landslide scarred and one vegetated. At these two sites, in addition to rainfall and air temperature, volumetric water content, pore pressure, soil suction, soil temperature, and barometric pressure were measured every 15 minutes. The instrumentation was designed to supplement landslide-rainfall thresholds developed by the U.S. Geological Survey with a long-term goal of advancing the understanding of the relationship between landslide potential and hydrologic forcing along the coastal bluffs. Additionally, the system was designed to function as a prototype monitoring system to evaluate criteria for site selection, instrument selection, and placement of instruments. The purpose of this report is to describe the monitoring system, present the data collected since installation, and describe significant events represented within the dataset, which is published as a separate data release. The findings provide insight for building and configuring larger, modular monitoring networks.
Hydrostatic Water Level Systems At Homestake DUSEL
NASA Astrophysics Data System (ADS)
Stetler, L. D.; Volk, J. T.
2009-12-01
Two arrays of Fermilab-style hydrostatic water level sensors have been installed in the former Homestake gold mine in Lead, SD, the site of the new Deep Underground Science and Engineering Laboratory (DUSEL). Sensors were constructed at Fermilab from 8.5 cm diameter PVC pipe (housing) that was sealed on the ends and fit with a proximity sensor. The instrument have a height of 10 cm. Two ports in each sensor housing provide for connectivity, the upper port for air and the bottom port for water. Multiple instruments connected in series provide a precise water level and differences in readings between successive sensors provide for ground tilt to be resolved. Sensor resolution is 5 μm per count and has a range of approximately 1.25 cm. Data output from each sensor is relayed to a Fermilab-constructed readout card that also has temperature/relative humidity and barometric pressure sensors connected. All data are relayed out of the mine by fiber optic cable and can be recorded by Ethernet at remote locations. The current arrays have been installed on the 2000-ft level (610 m) and consist of six instruments in each array. Three sensors were placed in a N-S oriented drift and three in an E-W oriented drift. Using this orientation, it is anticipated that tilt direction may be resolved in addition to overall tilt magnitude. To date the data show passage of earth tides and frequency analysis has revealed five components to this signal, three associated with the semi-diurnal (~12.4 hr) and two with the diurnal (~24.9 hr) tides. Currently, installation methods are being analyzed between concrete pillar and rib-mounting using the existing setup on the 2000-ft level. Using these results, two additional arrays of Fermilab instruments will be installed on the 4550-ft and 4850-ft levels (1387 and 1478 m, respectively). In addition to Fermilab instruments, several high resolution Budker tiltmeters (1 μm resolution) will be installed in the mine workings in the near future, some correlated to Fermilab instruments (for comparative analysis) and others in independent arrays. All tiltmeter data will be analyzed with water reduction data (currently being collected from the #6 winze as the mine is dewatered) and data from rock stress/fracture experiments to document net ground settling due to dewatering, potential collapse of stope areas and renewed excavation activities.
GOES data-collection system instrumentation, installation, and maintenance manual
Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.
1986-01-01
The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)
First-generation instrumentation for the Discovery Channel Telescope
NASA Astrophysics Data System (ADS)
Bida, Thomas A.; Dunham, Edward W.; Massey, Philip; Roe, Henry G.
2014-07-01
The 4.3m Discovery Channel Telescope (DCT) has been conducting part-time science operations since January 2013. The f/6.1, 0.5° field-of-view at the RC focus is accessible through the Cassegrain instrument cube assembly, which can support 5 co-mounted instruments with rapid feed selection via deployable fold mirrors. Lowell Observatory has developed the Large Monolithic Imager (LMI), a 12.3' FOV 6K x 6K single CCD camera with a dual filter wheel, and installed at the straight-through, field-corrected RC focal station, which has served as the primary early science DCT instrument. Two low-resolution facility spectrographs are currently under development with first light for each anticipated by early 2015: the upgraded DeVeny Spectrograph, to be utilized for single object optical spectroscopy, and the unique Near-Infrared High-Throughput Spectrograph (NIHTS), optimized for single-shot JHK spectroscopy of faint solar system objects. These spectrographs will be mounted at folded RC ports, and the NIHTS installation will feature simultaneous optical imaging with LMI through use of a dichroic fold mirror. We report on the design, construction, commissioning, and progress of these 3 instruments in detail. We also discuss plans for installation of additional facility instrumentation on the DCT.
Myren, Glenn; Johnston, Malcolm; Mueller, Robert
2011-01-01
High seismicity levels with accelerating uplift (under the resurgent dome) in Long Valley caldera in the eastern Sierra Nevada from 1989 to 1997, triggered upgrades to dilational strainmeters and other instrumentation installed in the early 1980's following a series of magnitude 6 earthquakes. This included two additional high-resolution borehole strainmeters and replacement of the failed strainmeter at Devil's Postpile. The purpose of the borehole-monitoring network is to monitor crustal deformation and other geophysical parameters associated with volcanic intrusions and earthquakes in the Long Valley Caldera. Additional instrumentation was added at these sites to improve the capability of providing continuous monitoring of the magma source under the resurgent dome. Sites were selected in regions of hard crystalline rock, where the expected signals from magmatic activity were calculated to be a maximum and the probability of an earthquake of magnitude 4 or greater is large. For the most part, the dilatometers were installed near existing arrays of surface tiltmeters, seismometers, level line, and GPS arrays. At each site, attempts are made to separate tectonic and volcanic signals from known noise sources in each instrument type. Each of these sites was planned to be a multi-parameter monitoring site, which included measurements of 3-component seismic velocity and acceleration, borehole strain, tilt, pore pressure and magnetic field. Using seismicity, geophysical knowledge, geologic and topographic maps, and geologists recommendations, lists of preliminary sites were chosen. Additional requirements were access, and telemetry constraints. When the final site choice was made, a permit was obtained from the U.S. Forest Service. Following this selection process, two new borehole sites were installed on the north and south side of the Long Valley Caldera in June of 1999. One site was located near Big Spring Campground to the east of Crestview. The second site was located at the Motocross Track (near Old Mammoth) in the South Moat. This report describes the methods used to install these strainmeters and various other types of borehole instruments at these sites together with the site at Devil's Postpile and telemeter the data obtained to the USGS base in Menlo Park, Calif.
NASA Astrophysics Data System (ADS)
Foster, A. E.; Almeida, R. V.; Akhter, S. H.; Hubbard, J.; Bhattacharya, R.; Shing, U. M.; Hosain, A.; Bulbul, M. A.
2016-12-01
Eastern Bangladesh is underlain by a fold and thrust belt accumulating 13-17 mm/yr of plate convergence on a locked, shallowly dipping décollement (Steckler et al., 2016). We have installed a network of short-period and broadband instruments in this region to better assess microseismicity and investigate the structure of the fold belt. Stations will remain in place for 1-2 years and will complement the temporary stations installed by the University of Dhaka and the Lamont-Doherty Earth Observatory. Thirteen Lennartz 1-Hz instruments and three Trillium Compact 120-s instruments were installed in the Sylhet area in June 2016. Station spacing is between 15-30 km. Installations ranged from shallow vaults to above-ground locations on solid foundations, as required by local conditions. One focus of this deployment is to locate microseismicity. Neither large numbers nor magnitudes of earthquakes are expected in this area, but improved locations may help define active areas of the convergence as well as illuminate the interactions between the Dauki fault (responsible for uplift of the Shillong Plateau), the Sylhet anticline, and the rest of the Indo-Burman Ranges. Nine additional short-period instruments and three additional broadband instruments will be installed in the Chittagong area in September 2016. The southern-most stations are located over the Andaman subduction zone, thought to be associated with a large subduction earthquake in 1762 (Steckler et al., 1998). Thus, the full deployment will span the transition from an on-land accretionary prism to an area considered a classic subduction zone. Combined, the northern and southern parts of the network should provide good locations for events within the Tripura area (India) as well. We present initial estimates of station quality and the potential for an earthquake catalogue. We plan to obtain earthquake locations and focal mechanisms, when possible, as the data is collected. We will apply ambient noise tomography methods to investigate the structure of the fold belt. These applications and others may contribute to unanswered questions in the area, such as the location of the frontal-most deformation associated with the fold and thrust belt and the geometry of the basal décollement at depth, and allow better characterization of the risk to nearby populations.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, a worker inside the Multi-Purpose Logistics Module Raffaello is ready for installation of the Human Research Facility-2 (HRF-2) science rack. Raffaello will fly on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, workers prepare the Human Research Facility-2 (HRF-2) science rack for installation into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, the Human Research Facility-2 (HRF-2) science rack sits on a stand waiting to be installed into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
14 CFR 33.29 - Instrument connection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must make provision for the installation of instrumentation necessary to ensure operation in compliance... assumed aircraft installation, then the applicant must specify this instrumentation in the engine installation instructions and declare it mandatory in the engine approval documentation. (f) As part of the...
Installation of EarthScope Borehole Strainmeters in Turkey to complement GONAF.
NASA Astrophysics Data System (ADS)
Johnson, W.; Gottlieb, M. H.; Mencin, D.; Van Boskirk, E.; Ozener, H.; Bohnhoff, M.; Bulut, F.; Bal, O.; Acarel, D.; Aydin, H.; Mattioli, G. S.
2015-12-01
Twice in the past 1000 years a sequence of damaging earthquakes has propagated over a period of a few decades along the North Anatolian Fault (NAF) in Turkey towards Istanbul, with the final earthquake in the sequence catastrophically damaging the city. This occurred most recently in 1509, causing 10,000 casualties in a population of about 200,000. The population is now 20 million, the building stock more fragile, and the last earthquake of the current sequence is considered imminent. Since July 2014, UNAVCO has installed 2 EarthScope borehole geophysical instrument strings, which include Gladwin Tensor strainmeters and passive, short-period 3-component seismometers, into boreholes provided by internationally supported Geophysical Observatory at the North Anatolian Fault (GONAF) and Bogazici University Kandilli Observatory. Funding for instruments and staff participation was provided by NSF. If the project remains on schedule, we anticipate that 4 additional BSM strings will be installed by the fall 2015. Our joint international project gives an opportunity to enhance the detection capability of a suite of deep seismometers (GONAF) installed near Istanbul and will permit us to image dynamic rupture along the NAF and to monitor and better understand the tectonic processes leading to failure. The tectonic and geodynamic environment of the NAF near Istanbul in many ways resembles the San Andreas Fault setting of San Francisco; these instruments will enhance the ability to monitor ultra-slow process near the probable source zone of the Mw>7 earthquake beneath the Marmara Sea on the NAF This project has provided UNAVCO an opportunity to gain experience in strainmeters installations outside of North America. The techniques developed to adapt to the challenges of installing borehole strainmeters on islands and other remote locations with limited resources will greatly enhance our ability to install these BSM instruments in similar locations in the future.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, the Human Research Facility-2 (HRF-2) science rack is attached to the Rack Insertion Device that will install it into the Multi-Purpose Logistics Module Raffaello (at left) for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, workers prepare to attach the Human Research Facility-2 (HRF-2) science rack onto the Rack Insertion Device. HRF-2 will be installed into the Multi-Purpose Logistics Module Raffaello (at left) for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
NASA Technical Reports Server (NTRS)
Flocke, Frank; Weinheimer, Andrew J.
2003-01-01
In Fall 2000, the PANs gas chromatograph (GC) was improved and prepared for installation on the NASA P-3. A number of experiments were conducted in conjunction with the NCAR NO,, instrument (B. Ridley) to settle some of the fine details of the output of the calibration system for each instrument. In addition, the sampling frequency was improved.
Acceptance test procedure for the L-070 project mechanical equipment and instrumentation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1996-04-19
This document contains the acceptance test procedure for the mechanical equipment and instrumentation installed per the L-070 Project. The specific system to be tested are the pump controls for the 3906 Lift Station and 350-A Lift Station. In addition, verification that signals are being received by the 300 Area Treated Effluent Disposal Facility control system, is also performed.
Long Valley Deep Hole Geophysical Observatory --- Strain Instrumentation and Installation.
NASA Astrophysics Data System (ADS)
Sacks, S. I.; Linde, A.; Malin, P.; Roeloffs, E. A.; Hill, D. P.; Ellsworth, W. L.
2003-12-01
The Long Valley Exploratory Well, drilled in the middle of the resurgent dome in the Long Valley caldera, was started in 1989 and after rather checkered progress eventually reached a depth of about 9,831 feet. The hole is cased to a depth of 7178 feet with bare rock below that. At 8,500 feet there is an open fracture system with substantial permeability. One of the goals of the instrument installation is to enable monitoring of this deep aquifer. The most satisfactory rock away from obvious large fractures was at about 7,400 feet, and this was the installation depth. The instrumentation package consisted of a bottom hole seismometer at a depth of about 8500 feet, and a coupled instrument string that was cemented to the rock at a depth of 7400 feet. The instrument string, 73 feet long, had an inflatable packer with an extension at the bottom, coupled to a seismometer with a cement exit port above it, a 22 foot long spacing tube connected to a 20 foot long sensing volume strainmeter assembly. The strainmeter unit is essentially an annulus with the cementing pipe passing through it. In addition, two seismometer cables, two water bypass tubes and a packer inflation tube, pass through the strainmeter, which is actually two concentric strainmeters. The outer unit is a dilatometer and the inner unit is a vertical component strainmeter. Before installation, the strainmeters and the 8000 foot long stainless steel coupling tubes were filled with filtered and degassed water. The instrument string and attached bottom hole seismometer were then lowered down the hole attached to drill pipe. Two optical fiber vertical strainmeters (one interferometer and one time-of-flight loop) consisting of three fibers were attached to the drill pipe as it was installed. After the drill pipe reached target depth, it was secured to the well head. The packer, at the bottom of the instrument package, was inflated, thus providing a sealed bottom for the cement. Cement was then pumped down the drill pipe, through the strainmeter assembly and out the tube about 25 feet below the bottom of the strain sensing assembly. About 450 feet of the hole was cemented, the cement going into the casing. The coupling tubes from the strainmeters were connected to a surface mounted sensing head that had hydraulic amplification and electronic transducers. Pressure changes in the lower aquifer cause flow through two 1/4 inch diameter tubes into the annulus outside the mounting and cementing pipe. An opening sleeve in the installed pipe will allow the resulting water level changes to be monitored in a protected environment. All installed instrumentation seems to be functioning satisfactorily.
Seismic instrumentation of buildings
Çelebi, Mehmet
2000-01-01
The purpose of this report is to provide information on how and why we deploy seismic instruments in and around building structures. The recorded response data from buildings and other instrumented structures can be and are being primarily used to facilitate necessary studies to improve building codes and therefore reduce losses of life and property during damaging earthquakes. Other uses of such data can be in emergency response situations in large urban environments. The report discusses typical instrumentation schemes, existing instrumentation programs, the steps generally followed in instrumenting a structure, selection and type of instruments, installation and maintenance requirements and data retrieval and processing issues. In addition, a summary section on how recorded response data have been utilized is included. The benefits from instrumentation of structural systems are discussed.
NASA Astrophysics Data System (ADS)
Tufts, Joseph R.; Lobdill, Rich; Haldeman, Benjamin J.; Haynes, Rachel; Hawkins, Eric; Burleson, Ben; Jahng, David
2008-07-01
The Las Cumbres Observatory Global Telescope Network (LCOGT) is an ambitious project to build and operate, within 5 years, a worldwide robotic network of 50 0.4, 1, and 2 m telescopes sharing identical instrumentation and optimized for precision photometry of time-varying sources. The telescopes, instrumentation, and software are all developed in house with two 2 m telescopes already installed. The LCOGT Imaging Lab is responsible for assembly and characterization of the network's cameras and instrumentation. In addition to a fully equipped CNC machine shop, two electronics labs, and a future optics lab, the Imaging Lab is designed from the ground up to be a superb environment for bare detectors, precision filters, and assembled instruments. At the heart of the lab is an ISO class 5 cleanroom with full ionization. Surrounding this, the class 7 main lab houses equipment for detector characterization including QE and CTE, and equipment for measuring transmission and reflection of optics. Although the first science cameras installed, two TEC cooled e2v 42-40 deep depletion based units and two CryoTiger cooled Fairchild Imaging CCD486-BI based units, are from outside manufacturers, their 18 position filter wheels and the remainder of the network's science cameras, controllers, and instrumentation will be built in house. Currently being designed, the first generation LCOGT cameras for the network's 1 m telescopes use existing CCD486-BI devices and an in-house controller. Additionally, the controller uses digital signal processing to optimize readout noise vs. speed, and all instrumentation uses embedded microprocessors for communication over ethernet.
14 CFR 33.29 - Instrument connection.
Code of Federal Regulations, 2014 CFR
2014-01-01
... must make provision for the installation of instrumentation necessary to ensure operation in compliance... other requirement, dependence is placed on instrumentation that is not otherwise mandatory in the assumed aircraft installation, then the applicant must specify this instrumentation in the engine...
14 CFR 33.29 - Instrument connection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must make provision for the installation of instrumentation necessary to ensure operation in compliance... other requirement, dependence is placed on instrumentation that is not otherwise mandatory in the assumed aircraft installation, then the applicant must specify this instrumentation in the engine...
14 CFR 33.29 - Instrument connection.
Code of Federal Regulations, 2012 CFR
2012-01-01
... must make provision for the installation of instrumentation necessary to ensure operation in compliance... other requirement, dependence is placed on instrumentation that is not otherwise mandatory in the assumed aircraft installation, then the applicant must specify this instrumentation in the engine...
14 CFR 33.29 - Instrument connection.
Code of Federal Regulations, 2013 CFR
2013-01-01
... must make provision for the installation of instrumentation necessary to ensure operation in compliance... other requirement, dependence is placed on instrumentation that is not otherwise mandatory in the assumed aircraft installation, then the applicant must specify this instrumentation in the engine...
Strain gage installation and survivability on geosynthetics used in flexible pavements
NASA Astrophysics Data System (ADS)
Brooks, Jeremy A.
The use of foil type strain gages on geosynthetics is poorly documented. In addition, very few individuals are versed in proper installation techniques or calibration methods. Due to the limited number of knowledgeable technicians there is no information regarding the susceptibility of theses gages to errors in installation by inexperienced installers. Also lacking in the documentation related to the use of foil type strain gages on geosynthetics is the survivability of the gages in field conditions. This research documented procedures for installation, calibration, and survivability used by the project team to instruments a full scale field installation in Marked Tree, AR. This research also addressed sensitivity to installation errors on both geotextile and geogrid. To document the process of gage installation an experienced technician, Mr. Joe Ables, formerly of the UASCE Waterways Experiment Station, was consulted. His techniques were combined with those discovered in related literature and those developed by the research team to develop processes that were adaptable to multiple gage geometries and parent geosynthetics. These processes were described and documented in a step by step manner with accompanying photographs, which should allow virtually anyone with basic electronics knowledge to install these gages properly. Calibration of the various geosynthetic / strain gage combinations was completed using wide width tensile testing on multiple samples of each material. The tensile testing process was documented and analyzed using digital photography to analyze strain on the strain gage itself. Calibration factors for each geosynthtics used in the full scale field testing were developed. In addition, the process was thoroughly documented to allow future researchers to calibrate additional strain gage and geosynthetic combinations. The sensitivity of the strain gages to installation errors was analyzed using wide width tensile testing and digital photography to determine the variability of the data collected from gages with noticeable installation errors as compared to properly installed gages. Induced errors varied based on the parent geosynthetics material, but included excessive and minimal waterproofing, gage rotation, gage shift, excessive and minimal adhesive, and excessive and minimal adhesive impregnation loads. The results of this work indicated that minor errors in geotextile gage installation that are noticeable and preventable by the experienced installer have no statistical significance on the data recorded during the life span of geotextile gages; however the lifespan of the gage may be noticeably shortened by such errors. Geogrid gage installation errors were found to cause statistically significant changes in the data recorded from improper installations. The issue of gage survivability was analyzed using small scale test sections instrumented and loaded similarly to field conditions anticipated during traditional roadway construction. Five methods of protection were tested for both geotextile and geogrid including a sand blanket, inversion, semi-hemispherical PCV sections, neoprene mats, and geosynthetic wick drain. Based on this testing neoprene mats were selected to protect geotextile installed gages, and wick drains were selected to protect geogrid installed gages. These methods resulted in survivability rates of 73% and 100% in the full scale installation respectively. This research and documentation may be used to train technicians to install and calibrate geosynthetic mounted foil type strain gages. In addition, technicians should be able to install gages in the field with a high probability of gage survivability using the protection methods recommended.
NetQuakes - A new approach to urban strong-motion seismology
NASA Astrophysics Data System (ADS)
Luetgert, J. H.; Evans, J. R.; Hamilton, J.; Hutt, C. R.; Jensen, E. G.; Oppenheimer, D. H.
2009-12-01
There is a recognized need for more densely sampled strong ground motion recordings in urban areas to provide more accurate ShakeMaps for post-earthquake disaster assessment and to provide data for structural engineers to improve design standards. Ideally, the San Francisco Bay area would have a strong ground motion recorder every 1-2 km to adequately sample the region’s varied geology and built environment. This would require the addition of thousands of instruments to the existing network. There are several fiscal and logistical constraints that prevent us from doing this with traditional strong motion instrumentation and telemetry. In addition to the initial expense of instruments and their installation, there are the continuing costs of telemetry and maintenance. To address these issues, the USGS implemented the NetQuakes project to deploy small, relatively inexpensive seismographs for installation in 1-2 story homes and businesses that utilize the host’s existing Internet connection. The recorder has 18 bit resolution with ±3g internal tri-axial MEMS accelerometers. Data is continuously recorded at 200 sps into a 1-2 week ringbuffer. When triggered, a miniSEED file is sent to USGS servers via the Internet. Data can also be recovered from the ringbuffer by a remote request through the servers. Following a power failure, the instrument can run for 36 hours using its internal battery. All client-server interactions are initiated by the instrument, so it safely resides behind a host’s firewall. Instrument and battery replacement can be performed by hosts to reduce maintenance costs. A connection to the host’s LAN, and thence to the public Internet, can be made using WiFi to minimize cabling. Although timing via a cable to an external GPS antenna is possible, it is simpler to use the Network Time Protocol (NTP) to synchronize the internal clock. NTP achieves timing accuracy generally better than a sample interval. Since February, 2009, we have installed more than 60 NetQuakes instruments in the San Francisco Bay Area and have successfully integrated their data into the near real time data stream of the Northern California Seismic System.
NASA Astrophysics Data System (ADS)
Holland, A. A.; Ringler, A. T.; Wilson, D.
2016-12-01
We attempt to estimate lower bounds on the repeatability for a number of common instrumentation parameters and provide estimates on the errors associated with the instrument installation itself. These parameters include the self-noise, the orientation, and the sensitivity. We installed three Trillium Compact instruments within 30 cm of each other in the same seismic vault at the Albuquerque Seismological Laboratory. We then repeatedly uninstall and reinstall one of the Trillium Compact instruments multiple times, while leaving the other two in place as reference installations. Using these trials we are then able to examine how repeatable several parameters are between the two reference instruments and the other instrument. We also completely uninstalled and reinstalled the three seismometers once during the testing, in order to examine the reproducibility of the entire experiment. Results indicate that relative sensitivity is highly repeatable, which is partly why we chose this particular sensor for this evaluation. We find that self-noise in the band of 0.1 to 30 s period of an instrument is repeatable to within about 2 dB. Increasing the period of interest from 30 to 100 s period we observe that the self-noise of an instrument can only be repeated to within about 3 dB and that the relative self-noise is not repeatable amongst the sensors. We also find that even though the seismometers are centimeters apart on a single marked line, that the relative orientation between installations is only repeatable to within 1-2 degrees. However, the relative orientations are reproducible, that is, with each installation the relative orientations are within the same amount of uncertainty. Some other broadband or very broadband instruments may not show as much repeatability between installations for some of the metrics we examined. From these tests we can say that instrument self-noise tests are reproducible to within a few dB.
Practical aspects of instrumentation system installation, volume 13
NASA Technical Reports Server (NTRS)
Borek, R. W.; Pool, A. (Editor); Sanderson, K. C. (Editor)
1981-01-01
A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.
Installation summary report : GRS instrumentation I-70 over Smith Road.
DOT National Transportation Integrated Search
2016-07-04
This report presents a summary of the I-70 over Smith Road GRS Instrumentation Project (the project) in Aurora, Colorado. The report summarizes the instruments used, installation means and methods, and a discussion on the web-based data interface. CD...
Aerodynamic stability analysis of NASA J85-13/planar pressure pulse generator installation
NASA Technical Reports Server (NTRS)
Chung, K.; Hosny, W. M.; Steenken, W. G.
1980-01-01
A digital computer simulation model for the J85-13/Planar Pressure Pulse Generator (P3 G) test installation was developed by modifying an existing General Electric compression system model. This modification included the incorporation of a novel method for describing the unsteady blade lift force. This approach significantly enhanced the capability of the model to handle unsteady flows. In addition, the frequency response characteristics of the J85-13/P3G test installation were analyzed in support of selecting instrumentation locations to avoid standing wave nodes within the test apparatus and thus, low signal levels. The feasibility of employing explicit analytical expression for surge prediction was also studied.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, the Rack Insertion Device moves the Human Research Facility-2 (HRF-2) science rack toward the Multi-Purpose Logistics Module Raffaello (at left) for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
The Inelastic Instrument suite at the SNS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Granroth, Garrett E; Abernathy, Douglas L; Ehlers, Georg
2008-01-01
Abstract The instruments in the extensive suite of spectrometers at the SNS are in various stages of installation and commissioning. The Back Scattering Spectrometer (BASIS) is installed and is in commissioning. It's near backscattering analyzer crystals provide the 3 eV resolution as expected. BASIS will enter the user program in the fall of 2007. The ARCS wide angular-range thermal to epithermal neutron spectrometer will come on line in the fall of 2007 followed shortly by the Cold Neutron Chopper Spectrometer. These two direct geometry instruments provide moderate resolution and the ability to trade resolution for flux. In addition both instrumentsmore » have detector coverage out to 140o to provide a large Q range. The SEQUOIA spectrometer, complete in 2008, is the direct geometry instrument that will provide fine resolution in the thermal to epithermal range. The Spin-Echo spectrometer, to be completed on a similar time scale, will provide the finest energy resolution worldwide. The HYSPEC spectrometer, available no later than 2011, will provide polarized capabilities and optimized flux in the thermal energy range. Finally, the Vision chemical spectrometer will use crystal analyzers to study energy transfers into the epithermal range« less
Installing SAM Instrument into Curiosity Mars Rover
2011-01-18
In this photograph, technicians and engineers inside a clean room at NASA Jet Propulsion Laboratory, Pasadena, Calif., position NASA Sample Analysis at Mars SAM above the mission Mars rover, Curiosity, for installing the instrument.
Updated Guidelines for ANSS Instruments
NASA Astrophysics Data System (ADS)
Evans, J. R.; Hutt, C. R.; Gee, L. S.
2014-12-01
In 2008 the Advanced National Seismic System (ANSS) of the U.S. Geological Survey (USGS) and cooperating universities and institutions issued USGS Open-File Report 2008-1262 (OFR) containing detailed guidelines for the performance of instrumentation to be used by the ANSS. Here we report an update underway to these guidelines to take account of lessons learned, changing technology, and expanding user desires; in a few instances, performance matters that are very hard to test in practice are either modified or removed. Instrument classes are defined in the OFR in terms of amplitude resolution and cost; because relevant technologies have advanced substantially in these six years and a number of groups have begun to explore the use of relatively inexpensive, entirely host installed and operated Class C systems, the guidelines for strong-motion sensors are being expanded to include detailed guidelines for them rather than just anticipating them. As always, Class A systems will form the state-of-the-art backbone of any network, with Class B filling in spatially and in areas otherwise not covered well. Class C systems would be an additional step in making networks denser by providing very inexpensive hardware, installation, and maintenance to fill in additionally between Class A and B sites, for example in a high-seismicity urban area, with Class A sites every 4-6 km, Class B every 2-3 km, and Class C at <1 km spacing. Class C devices would be both installed and maintained by hosts, not institutions, and therefore also would be economical for extending coverage in regions with widely spaced or rare large seismicity, such as the central and eastern U.S.
Systematic neutron guide misalignment for an accelerator-driven spallation neutron source
NASA Astrophysics Data System (ADS)
Zendler, C.; Bentley, P. M.
2016-08-01
The European Spallation Source (ESS) is a long pulse spallation neutron source that is currently under construction in Lund, Sweden. A considerable fraction of the 22 planned instruments extend as far as 75-150 m from the source. In such long beam lines, misalignment between neutron guide segments can decrease the neutron transmission significantly. In addition to a random misalignment from installation tolerances, the ground on which ESS is built can be expected to sink with time, and thus shift the neutron guide segments further away from the ideal alignment axis in a systematic way. These systematic errors are correlated to the ground structure, position of buildings and shielding installation. Since the largest deformation is expected close to the target, even short instruments might be noticeably affected. In this study, the effect of this systematic misalignment on short and long ESS beam lines is analyzed, and a possible mitigation by overillumination of subsequent guide sections investigated.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, a worker watches as the Rack Insertion Device slowly moves the Human Research Facility-2 (HRF-2) science rack into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, a worker stands by as the Rack Insertion Device slowly moves the Human Research Facility-2 (HRF-2) science rack into the Multi-Purpose Logistics Module Raffaello for flight on Space Shuttle Discoverys Return to Flight mission, STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF-1, installed on the U.S. Lab since May 2001, contains an ultrasound unit and gas analyzer. Both racks provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U.S. Laboratory, Destiny. NASA Kennedy Space Center and their prime contractor responsible for ISS element processing, The Boeing Company, prepared the rack for installation. The HRF Project is managed by NASA Johnson Space Center and implemented through contract with Lockheed Martin, Houston, Texas.
Parkfield, California, liquefaction prediction ( USA).
Holzer, T.L.; Bennett, M.J.; Youd, T.L.; Chen, A.T.F.
1988-01-01
The primary purpose of this short note is to formally record the liquefaction prediction (Holzer et al., 1986) made in connection with this predicted earthquake. In addition, this note serves to alert the seismic engineering community to special instrumentation being installed at the prediction site. The instrumentation will consist of 4 downhole accelerometers at depths ranging from 3-30 m, a surface accelerometer, 7 dynamic piezometers distributed in the sand strata between depths of 5 and 15 m, and a network of bench marks for measuring permanent ground deformation.-from Authors
Pressure drop in tubing in aircraft instrument installations
NASA Technical Reports Server (NTRS)
Wildhack, W A
1937-01-01
The theoretical basis of calculation of pressure drop in tubing is reviewed briefly. The effect of pressure drop in connecting tubing upon the operation and indication of aircraft instruments is discussed. Approximate equations are developed, and charts and tables based upon them are presented for use in designing installations of altimeters, air-speed indicators, rate-of-climb indicators, and air-driven gyroscopic instruments.
Utilization of the High Flux Isotope Reactor at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Selby, Douglas L; Bilheux, Hassina Z; Meilleur, Flora
2015-01-01
This paper addresses several aspects of the scientific utilization of the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR). Topics to be covered will include: 1) HFIR neutron scattering instruments and the formal instrument user program; 2) Recent upgrades to the neutron scattering instrument stations at the reactor, and 3) eMod a new tool for addressing instrument modifications and providing configuration control and design process for scientific instruments at HFIR and the Spallation Neutron Source (SNS). There are 15 operating neutron instrument stations at HFIR with 12 of them organized into a formal user program. Since the last presentationmore » on HFIR instruments at IGORR we have installed a Single Crystal Quasi-Laue Diffractometer instrument called IMAGINE; and we have made significant upgrades to HFIR neutron scattering instruments including the Cold Triple Axis Instrument, the Wide Angle Neutron Diffractometer, the Powder Diffractometer, and the Neutron Imaging station. In addition, we have initiated upgrades to the Thermal Triple Axis Instrument and the Bio-SANS cold neutron instrument detector system. All of these upgrades are tied to a continuous effort to maintain a high level neutron scattering user program at the HFIR. For the purpose of tracking modifications such as those mentioned and configuration control we have been developing an electronic system for entering instrument modification requests that follows a modification or instrument project through concept development, design, fabrication, installation, and commissioning. This system, which we call eMod, electronically leads the task leader through a series of questions and checklists that then identifies such things as ES&H and radiological issues and then automatically designates specific individuals for the activity review process. The system has been in use for less than a year and we are still working out some of the inefficiencies, but we believe that this will become a very effective tool for achieving the configuration and process control believed to be necessary for scientific instrument systems.« less
Comparisons of Two Plasma Instruments on the International Space Station
NASA Astrophysics Data System (ADS)
Balthazor, R.; McHarg, M. G.; Minow, J. I.; Chandler, M. O.; Musick, J. D.; Feldmesser, H.; Darrin, M. A.; Osiander, R.
2011-12-01
The United States Air Force Academy's Canary instrument, a low-cost ion spectrometer with integrated charge multiplication, was installed on the International Space Station (ISS) on shuttle flight STS-134. The primary goal of the Canary experiment is to measure ion signals in the wake when ISS is flying in the standard +XVV attitude. However, the instrument is pointed (approximately) into ram and detects ambient Low Earth Orbit ions when the ISS is flying in the -XVV attitude. Simultaneous observations with NASA's Floating Plasma Measurement Unit (FPMU) have been taken during these times, and the results from each instrument are compared, in order to determine the origin of energy variations observed in the Canary ion signal. In addition, insights into the ISS floating plasma potential at the two different instrument locations can be obtained.
Development of TPS flight test and operational instrumentation
NASA Technical Reports Server (NTRS)
Carnahan, K. R.; Hartman, G. J.; Neuner, G. J.
1975-01-01
Thermal and flow sensor instrumentation was developed for use as an integral part of the space shuttle orbiter reusable thermal protection system. The effort was performed in three tasks: a study to determine the optimum instruments and instrument installations for the space shuttle orbiter RSI and RCC TPS; tests and/or analysis to determine the instrument installations to minimize measurement errors; and analysis using data from the test program for comparison to analytical methods. A detailed review of existing state of the art instrumentation in industry was performed to determine the baseline for the departure of the research effort. From this information, detailed criteria for thermal protection system instrumentation were developed.
Gearbox Instrumentation for the Investigation of Bearing Axial Cracking
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Jonathan A; Lambert, Scott R
Failures in gearbox bearings have been the primary source of reliability issues for wind turbine drivetrains, leading to costly downtime and unplanned maintenance. The most common failure mode is attributed to so-called axial cracks or white-etching cracks, which primarily affect the intermediate and high-speed-stage bearings. The high-speed-shaft and bearing loads and sliding will be measured with a specially instrumented gearbox installed in a 1.5-megawatt turbine at the National Wind Technology Center in an upcoming test campaign. Additional instrumentation will also measure the tribological environment of these bearings, including bearing temperatures, lubricant temperature and water content, air temperature and humidity, andmore » stray electrical current across the bearings. This paper fully describes the instrumentation package and summarizes initial results.« less
Instrumentation for full-year plot-scale runoff monitoring
USDA-ARS?s Scientific Manuscript database
Replicated 0.34 ha cropping systems plots have been in place since 1991 at the USDA-ARS Goodwater Creek Experimental Watershed in central Missouri. Recently, instrumentation has been installed at 18 of those plots for continuous runoff water quality and quantity monitoring. That installation require...
Hawaii Energy and Environmental Technologies Initiative
2005-06-01
include a hydrate synthesis system, benthic pressure chambers to simulate deep seafloor sediment, and specialized instrumentation for high pressure...the high probability that a sulfide/oxygen microbial fuel cell can generate electricity in deep ocean sediments, and that prolonged power generation may...hydrogen generation (using an electrolyser) and storage, and on-line high -resolution gas analysis. In addition to installation and commissioning of
Lessons Learned From the Analysis of the SAFOD Downhole Instrument Package.
NASA Astrophysics Data System (ADS)
Johnson, Wade; Mencin, David; Mattioli, Glen
2013-04-01
In September of 2008 a downhole instrument package (DIP) consisting of a string of seismometers and tilt meters in isolated pressure vessels (PODs) was installed in the SAFOD main borehole. This package was designed to protect the sensors from the corrosive borehole environment and to operate for two years. The SAFOD borehole is not sealed at the bottom allowing borehole gasses and fluids infiltratration. Previous short-term installations of instruments in the SAFOD main borehole had also failed as a result of corrosion of the wireline cable head. The average failure time for these installations was two weeks. The use of stainless steel tubing connected to the pressure vessels through gas tight fittings was designed to block borehole fluid and gas infiltration of the individual instruments within the PODs. Unfortunately, the DIP completely failed within a month of its installation. In October of 2010, the DIP was removed from the borehole and a failure analysis was performed. This analysis involved to following steps: 1. Analysis of data to understand timeline of failure 2. Remove instrument safely, maintaining integrity of spliced section and documenting any external clues. Test instrument at surface 3. Open PODs in a way that allows for sampling and avoids damaging instruments. 4. Chemical analysis of fluids recovered from splices and PODs. 5. Instrument failure analysis by the instrument manufacturers. The analysis found that there were several design flaws in the DIP. This included the use of motor oil to take up air space in the individual PODs, use of a large number of gas tight seals, lack of internal seals, poorly done solder joints, use of non-temperature rated sensors, and lack of management oversight. The lessons learned from the attempts to instrument the SAFOD borehole are critical to the success of future deep borehole projects.
Infrared site testing of Mt. Lemmon and Catalina Observatory
NASA Technical Reports Server (NTRS)
Kuiper, G. P.
1973-01-01
The operation and problems involved with two sky noise meters installed in the Catalina Mountains near Tucson, Arizona are discussed. The instruments were installed at two different locations on Mt. Lemon. It was found that when photometric conditions prevailed, a positive correlation existed between the outputs of the two instruments. In particular, the strongdiurnal effect, in which the sky noise increases abruptly at sunrise and falls markedly after sunset, was reproduced by both instruments. Discrepancies in data recorded by the two instruments are analyzed and possible causes for the discrepancies are proposed.
Design and installation of a next generation pilot scale fermentation system.
Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P
2003-01-01
Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.
Measurement of the Coolant Channel Temperatures and Pressures of a Cooled Radial-Inflow Turbine
NASA Technical Reports Server (NTRS)
Dicicco, L. Danielle; Nowlin, Brent C.; Tirres, Lizet
1994-01-01
Instrumentation has been installed on the surface of a cooled radial-inflow turbine. Thermocouples and miniature integrated sensor pressure transducers were installed to measure steady state coolant temperatures, blade wall temperatures, and coolant pressures. These measurements will eventually be used to determine the heat transfer characteristics of the rotor. This paper will describe the procedures used to install and calibrate the instrumentation and the testing methods followed. A limited amount of data will compare the measured values to the predicted values.
2008-03-07
Climate researchers from the National Center for Atmospheric Research (NCAR) and several universities install and perform functional checkouts of a variety of sensitive atmospheric instruments on NASA's DC-8 airborne laboratory prior to beginning the ARCTAS mission.
NASA Astrophysics Data System (ADS)
Amato, A.; Luetkens, H.; Sedlak, K.; Stoykov, A.; Scheuermann, R.; Elender, M.; Raselli, A.; Graf, D.
2017-09-01
We report on the design and commissioning of a new spectrometer for muon-spin relaxation/rotation studies installed at the Swiss Muon Source (SμS) of the Paul Scherrer Institute (PSI, Switzerland). This new instrument is essentially a new design and replaces the old general-purpose surface-muon (GPS) instrument that has been for long the workhorse of the μSR user facility at PSI. By making use of muon and positron detectors made of plastic scintillators read out by silicon photomultipliers, a time resolution of the complete instrument of about 160 ps (standard deviation) could be achieved. In addition, the absence of light guides, which are needed in traditionally built μSR instrument to deliver the scintillation light to photomultiplier tubes located outside magnetic fields applied, allowed us to design a compact instrument with a detector set covering an increased solid angle compared with the old GPS.
1997-01-18
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lift the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) prior to its installation in the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.
Improving LADCP Velocity Profiles with External Attitude Sensors
NASA Astrophysics Data System (ADS)
Thurnherr, A. M.; Goszczko, I.
2016-12-01
Data collected with Acoustic Doppler Current Profilers installed on CTD rosettes and lowered through the water column (LADCP systems) are routinely used to derive full-depth profiles of ocean velocity. In addition to the uncertainties arising from random noise in the along-beam velocity measurements, LADCP derived velocities are commonly contaminated by bias errors due to imperfectly measured instrument attitude (pitch, roll and heading). Of particular concern are the heading measurements because it is not usually feasible to calibrate the internal ADCP compasses with the instruments installed on a CTD rosette, away from the magnetic disturbances of the ship as well as the current-carrying winch wire. Heading data from dual-headed LADCP systems, which consist of upward and downward-pointing ADCPs installed on the same rosette, commonly indicate heading-dependent compass errors with amplitudes exceeding 10 degrees. In an attempt to reduce LADCP velocity errors, over 200 full-depth profiles were collected during several recent projects, including GO-SHIP, DIMES and ECOGIG, with an inexpensive (<$200) external magnetometer/accelerometer package. The resulting data permit full compass calibrations (for both hard- and soft-iron effects) from in-situ profile data and yields improved pitch and roll measurements. Results indicate greatly reduced inconsistencies between the data from the two ADCPs (horizontal-velocity processing residuals), as well as smaller biases in vertical -velocity (w) measurements. In addition, the external magnetometer package allows processing of some LADCP data collected in regions where the horizontal magnitude of the earth's magnetic field is insufficient for the ADCPs internal compasses to work at all.
Emerging Technologies for Real-Time Continuous Monitoring of Wellbore Integrity
NASA Astrophysics Data System (ADS)
Freifeld, B. M.
2017-12-01
Assessment of a well's integrity has traditionally been carried out through periodic wireline logging, often performed only when an operational problem was noted at the surface. There are several emerging technologies that can be installed permanently as part of the well completion and offer the ability to monitor operations while providing continuous indicators to evaluate the structural health of a well. Permanent behind casing instrumentation, such as pressure and temperature gauges can monitor for behind casing leakage. Similarly, fiber-optic distributed temperature and acoustic sensing provide additional information for assessing unwanted movement of fluid, which is indicative of problems either inside or outside of casing. Furthermore, these technologies offer the benefit of providing real-time continuous streams of information that serve as leading-indicators of wellbore problems to allow for early intervention. Additional research is still needed to develop best practices for the installation and operation of these technologies, as they increase cost and add additional risks that must be managed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Needham, D.; Spearman, A.
This paper describes the design and development of a modular gas control installation which is completely buried, except for a small instrument housing and vent pipe. Buried installations controlling gas pressure have many advantages:- no unsightly or costly housings, protection from damage by vehicles or vandals, no problems of acquisition of sites in built-up areas, no need to divert mains to alternative locations, reduced noise, and easier planning permission associated with environmental aspects. It had not previously been possible to realise these advantages with conventional equipment but a novel concept has emerged which solves the problems and provides additional benefits.more » All the working components of a single stream governor station are installed under a 600mm diameter surface access cover. The essential control elements are contained in a lightweight cartridge which can be exchanged in about 15 minutes by two men working from ground level.« less
1981-05-01
coating process in Explosives Manufacturing Line 2. The end products of the initial design effort are process flow diagrams, piping and...instrumentation diagrams, motor control schedules, interlock logic diagrams, piping installation drawings, typical instrument Installation details, equipment...structures, equipment, utilities, and process piping extending 1.5 m (5 ft) beyond the building or area were not included in the scope of work. Nitrolysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Murray, Robert C.
Following the January 1980 earthquake that was felt at Lawrence Livermore National Laboratory (LLNL), a network of strong-motion accelerographs was installed at LLNL. Prior to the 1980 earthquake, there were no accelerographs installed. The ground motion from the 1980 earthquake was estimated from USGS instruments around the Laboratory to be between 0.2 – 0.3 g horizontal peak ground acceleration. These instruments were located at the Veterans Hospital, 5 miles southwest of LLNL, and in San Ramon, about 12 miles west of LLNL. In 2011, the Department of Energy (DOE) requested to know the status of our seismic instruments. We conductedmore » a survey of our instrumentation systems and responded to DOE in a letter. During this survey, it was found that the recorders in Buildings 111 and 332 were not operational. The instruments on Nova had been removed, and only three of the 10 NIF instruments installed in 2005 were operational (two were damaged and five had been removed from operation at the request of the program). After the survey, it was clear that the site seismic instrumentation had degraded substantially and would benefit from an overhaul and more attention to ongoing maintenance. LLNL management decided to update the LLNL seismic instrumentation system. The updated system is documented in this report.« less
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Joe Mounts, with Boeing, monitors the Payload Test and Checkout System for the Human Research Facility (HRF) Rack -2 payload. The HRF-2 is scheduled to fly on Return to Flight Space Shuttle mission STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF Rack 1 contains an ultrasound unit and gas analyzer system and has been operational in the U.S. Lab since May 2001. HRF-2 will also be installed in the U. S. Lab and will provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U. S. Lab.
Seismic instrumentation plan for the Hawaiian Volcano Observatory
Thelen, Weston A.
2014-01-01
The installation of new seismic stations is only the first part of building a volcanic early warning capability for seismicity in the State of Hawaii. Additional personnel will likely be required to study the volcanic processes at work under each volcano, analyze the current seismic activity at a level sufficient for early warning, build new tools for monitoring, maintain seismic computing resources, and maintain the new seismic stations.
James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers
NASA Technical Reports Server (NTRS)
Gardner, Jonathan P.
2008-01-01
JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.
NASA Technical Reports Server (NTRS)
Mc Crae, A. W., Jr.
1967-01-01
Multiconductor instrumentation cable in which the conducting wires are routed through two concentric copper tube sheaths, employing a compressed insulator between the conductors and between the inner and outer sheaths, is durable and easily installed in high thermal or nuclear radiation area. The double sheath is a barrier against moisture, abrasion, and vibration.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
... Instruments MD835 Lithium Ion (Li-ion) battery. The applicable airworthiness regulations do not contain... B200 and Other Aircraft Listed in Table 1, Approved Model List (AML); Installation of MD835 Lithium Ion... installation of the Mid-Continent Instruments MD835 Li-ion battery in the Hawker Beechcraft Corporation, B200...
Trillium Horizon, A Small Portable Observatory Grade Seismometer For Direct Bury And Vault Use
NASA Astrophysics Data System (ADS)
Moores, A.; Parker, T.; Bainbridge, G.
2017-12-01
As of August 2017 almost 5 years of data have been collected from broadband seismic sensors designed for direct burial applications. These first posthole instruments have been deployed in a wide range of extremely challenging environments such as dynamic ice and snow environments, extreme wet and dry conditions in soils of high clay content, and steep creeping terrain. In all use cases the direct burial approach has consistently provided high quality data when compared to shallow vault installations. In this presentation we extract and analyze operational performance data, including tilt information from mass position time series recorded at direct burial installations and at temporary shallow vault deployments. This data shows that while higher tilt tolerance is required for data quality outcome certainty in some installations, the majority of installations can be addressed by a smaller instrument with a narrower tilt range hence reducing size and cost. The lessons learned from this real world field data have guided the development of a new smaller, less expensive instrument, Trillium Horizon.Based on this analysis and and user feedback from many direct burial deployments, the Trillium Horizon seismometer has been developed as a simple versatile instrument to span the majority of deployment scenarios and specific use cases including shallow direct bury deployments, traditional piers, and problematic wet vault installs. With its small size, robust waterproof case and connector, +/-1.5° tilt range, dual-purpose cable, and accessories for both posthole and vault installation, Trillium Horizon is optimized for usability as well as performance.
1997-02-21
KENNEDY SPACE CENTER, Fla. -- Under the cover of darkness, the Space Shuttle orbiter Discovery glides in for a landing on Runway 15 at KSC's Shuttle Landing Facility at the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). New runway centerline lights provide an additional visual aid for the nighttime landings. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997
1997-02-21
KENNEDY SPACE CENTER, Fla. -- Under the cover of darkness, the Space Shuttle orbiter Discovery glides in for a landing on Runway 15 at KSC's Shuttle Landing Facility at the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). New runway centerline lights provide an additional visual aid for the nighttime landings. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997
1997-02-21
KENNEDY SPACE CENTER, Fla. -- Under the cover of darkness, the Space Shuttle orbiter Discovery glides in for a landing on Runway 15 at KSC's Shuttle Landing Facility at the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). New runway centerline lights provide an additional visual aid for the nighttime landings. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997
Cascadia, an ultracompact seismic instrument with over 200dB of dynamic range
NASA Astrophysics Data System (ADS)
Parker, Tim; Devanney, Peter; Bainbridge, Geoff; Townsend, Bruce
2017-04-01
Integration of geophysical instrumentation is clearly a way to lower overall station cost, make installations less complex, reduce installation time, increase station utility and value to a wider group of researchers, data miners and monitoring groups. Initiatives to expand early earthquake warning networks and observatories can use these savings for increasing station density. Integration of mature instrument systems such as broadband sensors and accelerometers used in strong motion studies has to be done with care to preserve the low noise and low frequency performance while providing over 200dB of dynamic range. Understanding the instrument complexities and deployment challenges allows the engineering teams to optimize the packaging to make installation and servicing cost effective, simple, routine and ultimately more reliable. We discuss early results from testing both in the lab and in the field of a newly released instrument called the Cascadia that integrates a broadband seismometer with a class A (USGS rating) accelerometer in a small stainless steel sonde suited for dense arrays in either ad hoc direct bury field deployments or in observatory quality shallow boreholes.
The EMBRACE Magnetometer Network in South America: Network Description and Firsts Results
NASA Astrophysics Data System (ADS)
Denardini, Clezio Marcos
We present the new EMBRACE Magnetometer Network in South America, which so far is planned to cover most of the Easter Southern American longitudinal sector deploying magnetometer in several locations. We discuss the purpose and scientific goals of the network, associated with the Low- and Mid-Latitude Ionospheric Currents and Space Weather. We provide details on the instrumentation, the inter-calibration procedure, and installations of equipments already installed. In addition, we present and discuss details on the data storage, near-real time display and availability. Finally, we provide some of the first results we already achieved from this network, including the development of new real time magnetic regional indices for South America. Contacting Author: C. M. Denardini (clezio.denardin@inpe.br)
Definitions of Economic and Technical Terms used in North Korea
1960-04-18
words, when the steel is heated up to an appropriate temperature, it is abruptly cooled either in water or in oil, thus changing the... water and sand. 7. Measuring Instruments (ChTukchong Kigu) These are lnstrunents used to measure length, weight, time, angle, and size according to...leakage of water , oil, steam and air. In addition, it is also used around contact points • when machinery and equipment are hastily installed* Pack
Nondestructive Vibratory Testing and Evaluation Procedure for Military Roads and Streets.
1984-07-01
the addition of an auto- matic data acquisition system to the instrumentation control panel. This system , presently available, would automatically ...the data used to further develop and define the basic correlations. c. Consideration be given to installing an automatic data acquisi- tion system to...glows red any time the force generator is not fully elevated. Depressing this switch will stop the automatic cycle at any point and clear all system
Canadian Seismicity Catalogue - Western Canada
NASA Astrophysics Data System (ADS)
Mulder, T.
2003-04-01
The first seismograph station in western Canada was installed in Victoria, BC, in 1898, under the Meteorological Service of Canada. By 1940, seismograph installations in Canada were amalgamated under the Dominion Observatory. The first short-period instruments were installed in western Canada in the early 1950's. The first digital instruments were installed in the mid-1970's. To date there are now 54 digital stations in western Canada that are routinely used in analysis as well as 2 paper-record stations. Detection ability has increased significantly over the past 20 years. Magnitude thresholds for locations vary over space and time reflecting seismicity levels, station distribution, and staffing levels. Currently the magnitude thresholds are (these do not necessarily equate to completeness levels): M=2.5-3.0 for western Canada; M=2.0 in the St Elias Mountains, YT, the northern Coast Mountains, BC, most of southern BC, and southwestern Alberta; M=1.0-1.5 in the Queen Charlotte Islands, southern Coast Mountains, and northern Vancouver Island; M=0.7-0.8 in southern Vancouver Island and the adjacent mainland. Events have been located with a variety of location programs over the years. A number of velocity models have been in use over time, currently resulting in a generic model for all of western Canada, and a model each for offshore, the Queen Charlotte Islands, and Vancouver Island. Recently purchased Antelope software will allow improved ability to maintain and possibly extend current magnitude thresholds as much of the daily analyst housekeeping tasks are decreased. Recent additions to the catalogue are regular computation of P-nodal and moment tensor solutions.
DEMINERALIZER BUILDING, TRA608. INSTALLATION OF SAMPLING AND OTHER INSTRUMENTS COMPLETES ...
DEMINERALIZER BUILDING, TRA-608. INSTALLATION OF SAMPLING AND OTHER INSTRUMENTS COMPLETES DEMINERALIZER UNITS ALONG NORTH WALL. CAMERA FACES EAST. CARD IN LOWER RIGHT WAS INSERTED BY INL PHOTOGRAPHER TO COVER AN OBSOLETE SECURITY RESTRICTION PRINTED ON THE ORIGINAL NEGATIVE. INL NEGATIVE NO. 3996A. Unknown Photographer, 12/28/1951 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Boundary Layer Transition Flight Experiment Overview
NASA Technical Reports Server (NTRS)
Berger, Karen T.; Anderson, Brian P.; Campbell, Charles H.; Garske, Michael T.; Saucedo, Luis A.; Kinder, Gerald R.; Micklos, Ann M.
2011-01-01
In support of the Boundary Layer Transition Flight Experiment (BLT FE) Project, a manufactured protuberance tile was installed on the port wing of Space Shuttle Orbiter Discovery for STS-119, STS-128, STS-131 and STS-133 as well as Space Shuttle Endeavour for STS-134. Additional instrumentation was installed in order to obtain more spatially resolved measurements downstream of the protuberance. This paper provides an overview of the BLT FE Project with emphasis on the STS-131 and STS-133 results. A high-level overview of the in-situ flight data is presented, along with a summary of the comparisons between pre- and post-flight analysis predictions and flight data. Comparisons show that empirically correlated predictions for boundary layer transition onset time closely match the flight data, while predicted surface temperatures were significantly higher than observed flight temperatures. A thermocouple anomaly observed on a number of the missions is discussed as are a number of the mitigation actions that will be taken on the final flight, STS-134, including potential alterations of the flight trajectory and changes to the flight instrumentation.
NASA Astrophysics Data System (ADS)
Mitsuzawa, K.; Goto, T.; Araki, E.; Watanabe, T.; Sugioka, H.; Kasaya, T.; Sayanagi, K.; Mikada, H.; Fujimoto, H.; Nagao, T.; Koizumi, K.; Asakawa, K.
2005-12-01
Western part of the Sagami Bay central Pacific side of Japan, is known as one of the high active tectonic areas. In this area, Teishi Knoll, volcanic seamount, erupted in 1989 and the earthquake swarms occurs repeatedly every few years in the eastern coast of the Izu Peninsula. The real-time deep sea floor observatory was deployed about 7 km off Hatsushima Island, Sagami Bay, at a depth of 1174 m in 1993 to monitor seismic activities, underwater pressure, water temperature and deep currents. The video camera and lights were also mounted in the observatory to monitor the relations among biological activities associated with the tectonic activities. The observation system including submarine electro-optical cable with a length of 8 km was completely renewed in 2000. The several underwater-mateable connectors are installed in the new observatory for additional observation instruments. A precise pressure sensor, ocean bottom gravity meter and ocean bottom electro-magnetic meter were installed using ROV Hyper-Dolphin in the cruise of R/V Natsushima from January 9 to 14, 2005. We start to operate them at February 10, 2005 after checking those of data qualities. We also installed an underwater internet interface, which is called Linux Box, as a prototype of underwater network system which was operated by Linux operating system. The Linux Box is a key network system for multidisciplinary observation network. It will be able to connect much kind of observation instruments as using internet connection. We put the precise pressure sensor as a sensor of the Linux Box in this experiment.
NASA Astrophysics Data System (ADS)
Hagimoto, Y.; Cuenca, R. H.
2015-12-01
Root zone soil water and temperature are controlling factors for soil organic matter accumulation and decomposition which contribute significantly to the CO2 flux of different ecosystems. An in-situ soil observation protocol developed at Oregon State University has been deployed to observe soil water and temperature dynamics in seven ecological research sites in North America as part of the NASA AirMOSS project. Three instrumented profiles defining a transect of less than 200 m are installed at each site. All three profiles collect data for in-situ water and temperature dynamics employing seven soil water and temperature sensors installed at seven depth levels and one infrared surface temperature sensor monitoring the top of the profile. In addition, two soil heat flux plates and associated thermocouples are installed at one of three profiles at each site. At each profile, a small 80 cm deep access hole is typically made, and all below ground sensors are installed into undisturbed soil on the side of the hole. The hole is carefully refilled and compacted so that root zone soil water and temperature dynamics can be observed with minimum site disturbance. This study focuses on the data collected from three sites: a) Tonzi Ranch, CA; b) Metolius, OR and c) BERMS Old Jack Pine Site, Saskatchewan, Canada. The study describes the significantly different seasonal root zone water and temperature dynamics under the various physical and biological conditions at each site. In addition, this study compares the soil heat flux values estimated by the standard installation using the heat flux plates and thermocouples installed near the surface with those estimated by resolving the soil heat storage based on the soil water and temperature data collected over the total soil profile.
Hay, Greg; Cercarelli, L Rina
2004-04-01
To examine the accuracy of coin-operated breath analysers installed in licensed premises in the Perth metropolitan area. Two hundred licensed premises were contacted, which resulted in the location of 36 wall-mounted, coin-operated breath analysers. One instrument was removed prior to testing. These premises were then visited and the accuracy of the instruments was tested in situ using National Association of Testing Authorities Australia (NATA) certified 0.080% and 0.100% ethanol in nitrogen gas. The instruments were installed in the licensed premises as follows: 15 in the lounge bar, 10 in the main entrance, six in the public bar, two in the passageway to the toilets, and one in the male toilets. One licensed premise provided a handheld breath instrument. All instruments were accompanied by warning and operating instructions, but only five had any educational material. Only seven of the licensed premises had staff who had received any training in the operation of the wall-mounted instruments. Half of the licensees were unaware of the servicing requirements of the instruments. The testing found that only nine (25%) of the instruments provided acceptable results. The low level of accuracy of coin-operated breath analysers in the Perth metropolitan area is alarming and users should be informed of the potential inaccuracies. This paper, however, does not rule out that some wall-mounted breath analysing instruments may provide accurate results when properly maintained.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Nancy Lowry (left) and Mikiko Ujihara, with Boeing, monitor the Payload Test and Checkout System for the Human Research Facility (HRF) Rack -2 payload. The HRF-2 is scheduled to fly on Return to Flight Space Shuttle mission STS- 114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF Rack 1 contains an ultrasound unit and gas analyzer system and has been operational in the U.S. Lab since May 2001. HRF-2 will also be installed in the U. S. Lab and will provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U. S. Lab.
Strong Motion Instrumentation of Seismically-Strengthened Port Structures in California by CSMIP
Huang, M.J.; Shakal, A.F.
2009-01-01
The California Strong Motion Instrumentation Program (CSMIP) has instrumented five port structures. Instrumentation of two more port structures is underway and another one is in planning. Two of the port structures have been seismically strengthened. The primary goals of the strong motion instrumentation are to obtain strong earthquake shaking data for verifying seismic analysis procedures and strengthening schemes, and for post-earthquake evaluations of port structures. The wharves instrumented by CSMIP were recommended by the Strong Motion Instrumentation Advisory Committee, a committee of the California Seismic Safety Commission. Extensive instrumentation of a wharf is difficult and would be impossible without the cooperation of the owners and the involvement of the design engineers. The instrumentation plan for a wharf is developed through study of the retrofit plans of the wharf, and the strong-motion sensors are installed at locations where specific instrumentation objectives can be achieved and access is possible. Some sensor locations have to be planned during design; otherwise they are not possible to install after construction. This paper summarizes the two seismically-strengthened wharves and discusses the instrumentation schemes and objectives. ?? 2009 ASCE.
Low-Energy Charged Particle Instrument Assembly
2012-12-03
This image shows the low-energy charged particle instrument before it was installed on one of NASA Voyager spacecraft in 1977. The instrument includes a stepper motor that turns the platform on which the sensors are mounted.
An overview and the current status of instrumentation at the Large Binocular Telescope Observatory
NASA Astrophysics Data System (ADS)
Wagner, R. Mark; Edwards, Michelle L.; Kuhn, Olga; Thompson, David; Veillet, Christian
2014-07-01
An overview of instrumentation for the Large Binocular Telescope (LBT) is presented. Optical instrumentation includes the Large Binocular Camera (LBC), a pair of wide-field (24' × 24') mosaic CCD imagers at the prime focus, and the Multi-Object Double Spectrograph (MODS), a pair of dual-beam blue-red optimized long-slit spectrographs mounted at the left and right direct F/15 Gregorian foci incorporating multiple slit masks for multi-object spectroscopy over a 6' field and spectral resolutions of up to 2000. Infrared instrumentation includes the LBT Near-IR Spectrometer (LUCI), a modular near-infrared (0.9-2.5 μm) imager and spectrograph pair mounted at the left and right front-bent F/15 Gregorian foci and designed for seeing-limited (FOV: 4' × 4') imaging, long-slit spectroscopy, and multi-object spectroscopy utilizing cooled slit masks and diffraction limited (FOV: 0'.5 x 0'.5) imaging and long-slit spectroscopy. Strategic instruments under development that can utilize the full 23 m baseline of the LBT include an interferometric cryogenic beam combiner with near-infrared and thermal-infrared instruments for Fizeau imaging and nulling interferometry (LBTI) and an optical bench near- infrared beam combiner utilizing multi-conjugate adaptive optics for high angular resolution and sensitivity (LINC-NIRVANA). LBTI is currently undergoing commissioning and performing science observations on the LBT utilizing the installed adaptive secondary mirrors in both single-sided and two-sided beam combination modes. In addition, a fiber-fed bench spectrograph (PEPSI) capable of ultra high resolution spectroscopy and spectropolarimetry (R = 40,000-300,000) will be available as a principal investigator instrument. Installation and testing of the bench spectrograph will begin in July 2014. Over the past four years the LBC pair, LUCI1, and MODS1 have been commissioned and are now scheduled for routine partner science observations. Both LUCI2 and MODS2 passed their laboratory acceptance milestones in the summer of 2013 and have been installed on the LBT. LUCI2 is currently being commissioned and the data analysis is well underway. Diffraction-limited commissioning of its adaptive optics modes will begin in the 2014B semester. MODS2 commissioning began in May 2014 and will completed in the 2014B semester as well. Binocular testing and commissioning of both the LUCI and MODS pairs will begin in 2014B with the goal that this capability could be offered sometime in 2015. The availability of all these instruments mounted simultaneously on the LBT permits unique science, flexible scheduling, and improved operational support.
2016-09-13
NASA astronaut Kate Rubins works on Selectable Optical Diagnostics Instrument Experiment Diffusion Coefficient Mixture-3 (SODI) DCMix-3 Installation inside the station’s Microgravity Science Glovebox. The glovebox is one of the major dedicated science facilities inside the Destiny laboratory and provides a sealed environment for conducting science and technology experiments. The glovebox is particularly suited for handling hazardous materials when the crew is present.
Simple, Affordable and Sustainable Borehole Observatories for Complex Monitoring Objectives
NASA Astrophysics Data System (ADS)
Kopf, A.; Hammerschmidt, S.; Davis, E.; Saffer, D.; Wheat, G.; LaBonte, A.; Meldrum, R.; Heesemann, M.; Villinger, H.; Freudenthal, T.; Ratmeyer, V.; Renken, J.; Bergenthal, M.; Wefer, G.
2012-04-01
Around 20 years ago, the scientific community started to use borehole observatories, so-called CORKs or Circulation Obviation Retrofit Kits, which are installed inside submarine boreholes, and which allow the re-establishment and monitoring of in situ conditions. From the first CORKs which allowed only rudimentary fluid pressure and temperature measurements, the instruments evolved to multi-functional and multi-level subseafloor laboratories, including, for example, long-term fluid sampling devices, in situ microbiological experiments or strainmeter. Nonetheless, most boreholes are still left uninstrumented, which is a major loss for the scientific community. In-stallation of CORKs usually requires a drillship and subsequent ROV assignments for data download and instru-ment maintenance, which is a major logistic and financial effort. Moreover, the increasing complexity of the CORK systems increased not only the expenses but led also to longer installation times and a higher sensitivity of the in-struments to environmental constraints. Here, we present three types of Mini-CORKs, which evolved back to more simple systems yet providing a wide range of possible in situ measurements. As a regional example the Nankai Trough is chosen, where repeated subduction thrust earthquakes with M8+ occurred. The area has been investigated by several drilling campaigns of the DSDP, ODP and IODP, where boreholes were already instrumented by different CORKs. Unfortunately, some of the more complex systems showed incomplete functionality, and moreover, the increased ship time forced IODP to rely on third party funds for the observatories. Consequently, the need for more affordable CORKs arose, which may be satisfied by the systems presented here. The first type, the so-called SmartPlug, provides two pressure transducers and four temperature sensors, and monitors a hydrostatic reference section and an isolated zone of interest. It was already installed at the Nankai Trough accretionary prism during IODP Exp. 319 and successfully recovered during IODP Exp. 332, both cruises being part of NanTroSEIZE (Nankai Trough Seismogenic Zone Experiment). The 15-months long data showed transients related to the arrival of seismic waves, storms and can further be used for detection of seismogenic strain events. Moreover, based on tidal signals in the pressure data, it was possible to make assumptions regarding the elastic properties of the surrounding formation. The SmartPlug was exchanged by an enhanced version, the GeniusPlug, which provides additional fluid sampling devices and microbiological experiments during the monitoring period. Its recovery is planned for 2013. Going one step further in simplicity, a Mini-CORK has recently developed especially designed for the portable seafloor drill rig MeBo (MARUM, Univ. Bremen, Germany), which can be installed without a drillship and which, due to its telemetric unit, makes costly recovery operations obsolete. The MeBo can be operated from any re-search vessel and allows coring to a depth of 70 m, which may be followed by instrumentation of the borehole with the MeBo-CORK. Two designs are available: the first design allows in situ measurement of pressure and temperature solely, whereas the second design consists of a seafloor unit including additional mission specific sensors (osmo-samlers for geochemistry and microbiology, etc.). A first field test for the MeBo-CORKs into mud volcanoes in the Kumano forearc basin is envisaged for summer 2012 to complement IODP project NanTroSEIZE.
14 CFR 23.1311 - Electronic display instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electronic display instrument systems. 23... Equipment Instruments: Installation § 23.1311 Electronic display instrument systems. (a) Electronic display..., considering the expected electronic display brightness level at the end of an electronic display indictor's...
14 CFR 23.1311 - Electronic display instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electronic display instrument systems. 23... Equipment Instruments: Installation § 23.1311 Electronic display instrument systems. (a) Electronic display..., considering the expected electronic display brightness level at the end of an electronic display indictor's...
14 CFR 23.1311 - Electronic display instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electronic display instrument systems. 23... Equipment Instruments: Installation § 23.1311 Electronic display instrument systems. (a) Electronic display..., considering the expected electronic display brightness level at the end of an electronic display indictor's...
Visitor's Computer Guidelines Network Connection Request Instruments Instruments by Telescope IR Instruments â¹âº You are here CTIO Home » Astronomers » Instruments » IR Instruments » ANDICAM ANDICAM the 1998B semester. The IR array was installed in July 1999, enabling simultaneous optical and
NASA Technical Reports Server (NTRS)
Cornelius, Michael; Smartt, Ziba; Henrie, Vaughn; Johnson, Mont
2003-01-01
The recent developments in Fabry-Perot fiber optic instruments have resulted in accurate transducers with some of the physical characteristics required for use in obtaining internal data from solid rocket motors. These characteristics include small size, non-electrical excitation, and immunity to electro-magnetic interference. These transducers have not been previously utilized in this environment due to the high temperatures typically encountered. A series of tests were conducted using a 1 1-Inch Hybrid test bed to develop installation techniques that will allow the fiber optic instruments to survive and obtain data for a short period of time following the motor ignition. The installation methods developed during this test series have the potential to allow data to be acquired in the motor chamber, propellant bore, and nozzle during the ignition transient. These measurements would prove to be very useful in the characterization of current motor designs and provide insight into the requirements for further refinements. The process of developing these protective methods and the installation techniques used to apply them is summarized.
Lifting SAM Instrument for Installation into Mars Rover
2011-01-18
NASA Sample Analysis at Mars SAM instrument, largest of the 10 science instruments for NASA Mars Science Laboratory mission, will examine samples of Martian rocks, soil and atmosphere for information about chemicals that are important to life.
14 CFR 25.1303 - Flight and navigation instruments.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Flight and navigation instruments. 25.1303... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1303 Flight and navigation instruments. (a) The following flight and navigation instruments must be installed so that the...
14 CFR 25.1303 - Flight and navigation instruments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Flight and navigation instruments. 25.1303... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1303 Flight and navigation instruments. (a) The following flight and navigation instruments must be installed so that the...
14 CFR 23.1311 - Electronic display instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electronic display instrument systems. 23... Equipment Instruments: Installation § 23.1311 Electronic display instrument systems. Link to an amendment published at 76 FR 75760, December 2, 2011. (a) Electronic display indicators, including those with features...
Engineers Install Near Infrared Camera into the Heart of Webb Telescope
2014-03-31
nside the world's largest clean room at NASA's Goddard Space Flight Center in Greenbelt, Md., engineers worked tirelessly to install another essential part of the James Webb Space Telescope - the Near Infrared Camera into the heart of the telescope. To complete this installation, the engineers needed to carefully move NIRCam inside the heart or ISIM, or Integrated Science Instrument Module that will house all of the science instruments. "Installing NIRCam into the center of the structure is nerve wracking because of the tight clearances," said Marcia J. Rieke, Professor of Astronomy at the University of Arizona, and principal investigator for the NIRCam. "I'm glad nothing bumped, and all the bolts are in place." NIRCam is a unique machine because in addition to being one of the four science instruments on the Webb, it also serves as the wavefront sensor, which means it will provide vital information for shaping the telescope mirrors and aligning its optics so that they can function properly and see into the distant universe. The NIRCam instrument will operate at very cold temperatures, and will be tested to ensure that it will be able to withstand the environment of space. The NIRCam is Webb's primary imager that will cover the infrared wavelength range 0.6 to 5 microns. It will detect light from the earliest stars and galaxies in the process of formation, the population of stars in nearby galaxies, as well as young stars and exoplanets in the Milky Way. NIRCam is provided by the University of Arizona and Lockheed Martin Advanced Technology Center. Webb is an international project led by NASA with its partners the European Space Agency and the Canadian Space Agency. The James Webb Space Telescope is the successor to NASA's Hubble Space Telescope. It will be the most powerful space telescope ever built. For more information about the Webb telescope, visit: www.jwst.nasa.gov or www.nasa.gov/webb Credit: NASA/Goddard/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
MCNP simulation to optimise in-pile and shielding parts of the Portuguese SANS instrument.
Gonçalves, I F; Salgado, J; Falcão, A; Margaça, F M A; Carvalho, F G
2005-01-01
A Small Angle Neutron Scattering instrument is being installed at one end of the tangential beam tube of the Portuguese Research Reactor. The instrument is fed using a neutron scatterer positioned in the middle of the beam tube. The scatterer consists of circulating H2O contained in a hollow disc of Al. The in-pile shielding components and the shielding installed around the neutron selector have been the object of an MCNP simulation study. The quantities calculated were the neutron and gamma-ray fluxes in different positions, the energy deposited in the material by the neutron and gamma-ray fields, the material activation resulting from the neutron field and radiation doses at the exit wall of the shutter and around the shielding. The MCNP results are presented and compared with results of an analytical approach and with experimental data collected after installation.
Demonstration of subsidence monitoring system
NASA Astrophysics Data System (ADS)
Conroy, P. J.; Gyarmaty, J. H.; Pearson, M. L.
1981-06-01
Data on coal mine subsidence were studied as a basis for the development of subsidence control technology. Installation, monitoring, and evaluation of three subsidence monitoring instrument systems were examined: structure performance, performance of supported systems, and performance of caving systems. Objectives of the instrument program were: (1) to select, test, assemble, install, monitor, and maintain all instrumentation required for implementing the three subsidence monitoring systems; and (2) to evaluate performance of each instrument individually and as part of the appropriate monitoring system or systems. The use of an automatic level and a rod extensometer for measuring structure performance, and the automatic level, steel tape extensometer, FPBX, FPBI, USBM borehole deformation gauge, and vibrating wire stressmeters for measuring the performance of caving systems are recommended.
ERIC Educational Resources Information Center
Air Force Occupational Measurement Center, Lackland AFB, TX.
The Avionics Instrument Systems career ladder (AFSC 325X1) provides flight line and shop maintenance training on aircraft instrument systems, electromechancial instruments, components, and test equipment. Duties involve inspecting, removing, installing, repairing, operating, troubleshooting, overhauling, and modifying systems such as flight and…
14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.
Code of Federal Regulations, 2011 CFR
2011-01-01
... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...
14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.
Code of Federal Regulations, 2014 CFR
2014-01-01
... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...
14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.
Code of Federal Regulations, 2010 CFR
2010-01-01
... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...
14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.
Code of Federal Regulations, 2013 CFR
2013-01-01
... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...
14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.
Code of Federal Regulations, 2012 CFR
2012-01-01
... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...
Seismic component of the STEEP project, Alaska: Results of the first field season
NASA Astrophysics Data System (ADS)
Hansen, R. A.; Estes, S.; Stachnik, J.; Lafevers, M.; Roush, J.; Sanches, R.; Fuerst, E.; Sandru, J.; Ruppert, N.; Pavlis, G.; Bauer, M.
2005-12-01
STEEP (SainT Elias Erosion/tectonics Project) is a five year, multi-disciplinary study that addresses evolution of the highest coastal mountain range on Earth - the St. Elias Mountains of southern Alaska and northwestern Canada. The overall goal of the project is to develop a comprehensive model for the St. Elias orogen that accounts for the interaction of regional plate tectonic processes, structural development, and rapid erosion. The seismic component of this project includes passive seismic experiment utilizing the IRIS PASSCAL Program instruments. The total project consists of 22 new, telemetered, digital broad band seismic stations, most accessible by helicopter only. There are 12 existing short period stations in the area. Eight new stations were installed in the coastal region in June 2005. Freewave IP radios provide the telemetry to the newly installed VSAT at the Bering Glacier camp site. The challenge was to find ice-free locations, on bedrock, large enough to install equipment and still have a helicopter landing zone nearby. The stations consist of Quanterra Q330 digitizers with baler, a STS-2 seismometer installed in a vault, a Freewave IP radio, a Scala 900 Mhz antenna, twenty 100 AH rechargeable batteries with a 2400AH backup Celair primary battery, and three solar panels mounted on hut. The acquired data is recorded in real time at the Alaska Earthquake Information Center located in Fairbanks and is incorporated into the standard data processing procedures. High quality data allows for more reliable automatic earthquake detections in the region with lower magnitude threshold. In addition to tectonic earthquakes, glacial events that occur within the vast ice fields of the region are also regularly detected. Broadband instruments complement regional broadband network for more reliable calculations of the regional moment tensors.
Techniques for Embedding Instrumentation in Pressure Vessel Test Articles
NASA Technical Reports Server (NTRS)
Cornelius, Michael
2006-01-01
Many interesting structural and thermal events occur in materials that are housed within a surrounding pressure vessel. In order to measure the environment during these events and explore their causes instrumentation must be installed on or in the material. Transducers can be selected that are small enough to be embedded within the test material but these instruments must interface with an external system in order to apply excitation voltages and output the desired data. The methods for installing the instrumentation and creating an interface are complicated when the material is located in a case or housing containing high pressures and hot gases. Installation techniques for overcoming some of these difficulties were developed while testing a series of small-scale solid propellant and hybrid rocket motors at Marshall Space Flight Center. These techniques have potential applications in other test articles where data are acquired from materials that require containment due to the severe environment encountered during the test process. This severe environment could include high pressure, hot gases, or ionized atmospheres. The development of these techniques, problems encountered, and the lessons learned from the ongoing testing process are summarized.
A low-cost programmable pulse generator for physiology and behavior
Sanders, Joshua I.; Kepecs, Adam
2014-01-01
Precisely timed experimental manipulations of the brain and its sensory environment are often employed to reveal principles of brain function. While complex and reliable pulse trains for temporal stimulus control can be generated with commercial instruments, contemporary options remain expensive and proprietary. We have developed Pulse Pal, an open source device that allows users to create and trigger software-defined trains of voltage pulses with high temporal precision. Here we describe Pulse Pal’s circuitry and firmware, and characterize its precision and reliability. In addition, we supply online documentation with instructions for assembling, testing and installing Pulse Pal. While the device can be operated as a stand-alone instrument, we also provide application programming interfaces in several programming languages. As an inexpensive, flexible and open solution for temporal control, we anticipate that Pulse Pal will be used to address a wide range of instrumentation timing challenges in neuroscience research. PMID:25566051
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. In the Space Station Processing Facility, Gaschen Geissen and Elton Witt, with Lockheed Martin, monitor the Payload Test and Checkout System for the Human Research Facility (HRF) Rack -2 payload. The HRF-2 is scheduled to fly on Return to Flight Space Shuttle mission STS-114. The HRF-2 will deliver additional biomedical instrumentation and research capability to the International Space Station. HRF Rack 1 contains an ultrasound unit and gas analyzer system and has been operational in the U.S. Lab since May 2001. HRF-2 will also be installed in the U. S. Lab and will provide structural, power, thermal, command and data handling, and communication and tracking interfaces between the HRF biomedical instrumentation and the U. S. Lab.
14 CFR 23.1337 - Powerplant instruments installation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... against damage; (3) Each sight gauge that forms a trap in which water can collect and freeze must have... not proceeding as planned. (c) Fuel flowmeter system. If a fuel flowmeter system is installed, each...
14 CFR 23.1337 - Powerplant instruments installation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... against damage; (3) Each sight gauge that forms a trap in which water can collect and freeze must have... not proceeding as planned. (c) Fuel flowmeter system. If a fuel flowmeter system is installed, each...
14 CFR 23.1337 - Powerplant instruments installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... against damage; (3) Each sight gauge that forms a trap in which water can collect and freeze must have... not proceeding as planned. (c) Fuel flowmeter system. If a fuel flowmeter system is installed, each...
14 CFR 23.1337 - Powerplant instruments installation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... against damage; (3) Each sight gauge that forms a trap in which water can collect and freeze must have... not proceeding as planned. (c) Fuel flowmeter system. If a fuel flowmeter system is installed, each...
14 CFR 23.1337 - Powerplant instruments installation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... against damage; (3) Each sight gauge that forms a trap in which water can collect and freeze must have... not proceeding as planned. (c) Fuel flowmeter system. If a fuel flowmeter system is installed, each...
Du, Lei; Sun, Qiao; Cai, Changqing; Bai, Jie; Fan, Zhe; Zhang, Yue
2018-01-01
Traffic speed meters are important legal measuring instruments specially used for traffic speed enforcement and must be tested and verified in the field every year using a vehicular mobile standard speed-measuring instrument to ensure speed-measuring performances. The non-contact optical speed sensor and the GPS speed sensor are the two most common types of standard speed-measuring instruments. The non-contact optical speed sensor requires extremely high installation accuracy, and its speed-measuring error is nonlinear and uncorrectable. The speed-measuring accuracy of the GPS speed sensor is rapidly reduced if the amount of received satellites is insufficient enough, which often occurs in urban high-rise regions, tunnels, and mountainous regions. In this paper, a new standard speed-measuring instrument using a dual-antenna Doppler radar sensor is proposed based on a tradeoff between the installation accuracy requirement and the usage region limitation, which has no specified requirements for its mounting distance and no limitation on usage regions and can automatically compensate for the effect of an inclined installation angle on its speed-measuring accuracy. Theoretical model analysis, simulated speed measurement results, and field experimental results compared with a GPS speed sensor with high accuracy showed that the dual-antenna Doppler radar sensor is effective and reliable as a new standard speed-measuring instrument. PMID:29621142
Du, Lei; Sun, Qiao; Cai, Changqing; Bai, Jie; Fan, Zhe; Zhang, Yue
2018-04-05
Traffic speed meters are important legal measuring instruments specially used for traffic speed enforcement and must be tested and verified in the field every year using a vehicular mobile standard speed-measuring instrument to ensure speed-measuring performances. The non-contact optical speed sensor and the GPS speed sensor are the two most common types of standard speed-measuring instruments. The non-contact optical speed sensor requires extremely high installation accuracy, and its speed-measuring error is nonlinear and uncorrectable. The speed-measuring accuracy of the GPS speed sensor is rapidly reduced if the amount of received satellites is insufficient enough, which often occurs in urban high-rise regions, tunnels, and mountainous regions. In this paper, a new standard speed-measuring instrument using a dual-antenna Doppler radar sensor is proposed based on a tradeoff between the installation accuracy requirement and the usage region limitation, which has no specified requirements for its mounting distance and no limitation on usage regions and can automatically compensate for the effect of an inclined installation angle on its speed-measuring accuracy. Theoretical model analysis, simulated speed measurement results, and field experimental results compared with a GPS speed sensor with high accuracy showed that the dual-antenna Doppler radar sensor is effective and reliable as a new standard speed-measuring instrument.
14 CFR 25.1331 - Instruments using a power supply.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Instruments: Installation § 25... may be accomplished automatically or by manual means. (3) If an instrument presenting navigation data... gyroscopic direction indicator that includes a magnetic sensing element, a gyroscopic unit, an amplifier and...
Free-flow variability on the Jess and Souza Ranches, Altamont Pass. [Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nierenberg, R.
1988-04-25
A central monitoring computer was installed on each ranch. The computers were connected by communication cables to 50 turbines on the Souza Ranch and 150 turbines on the Jess Ranch. Anemometers were installed on every other turbine on 12-foot booms at 35 feet above ground level (AGL). Spacing between anemometers was approximately 200 feet in the crosswind direction by 500 feet in the parallel direction. A total of 23 turbines on the Souza Ranch was instrumented in this fashion, as well as two multi-level meteorological towers. On the Jess Ranch, 77 turbines were instrumented; about half at 35 feet AGLmore » and half at 50 feet AGL, plus four additional towers. Wind data were collected for approximately a 100 hour period on each ranch. All turbines were shut down during these periods so that no turbine wakes would be present. The data periods were selected by the meteorologist to insure that they occurred during typical spring-summer flow regimes. The terrain features upwind of the site appear to play as significant a role in the flow variability as terrain features within the site.« less
Free-flow variability on the Jess and Souza Ranches, Altamont Pass
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nierenberg, R.
1988-04-25
A central monitoring computer was installed on each ranch. The computers were connected by communication cables to 50 turbines on the Souza Ranch and 150 turbines on the Jess Ranch. Anemometers were installed on every other turbine on 12-foot booms at 35 feet above ground level (AGL). Spacing between anemometers was approximately 200 feet in the crosswind direction by 500 feet in the parallel direction. A total of 23 turbines on the Souza Ranch was instrumented in this fashion, as well as two multi-level meteorological towers. On the Jess Ranch, 77 turbines were instrumented; about half at 35 feet AGLmore » and half at 50 feet AGL, plus four additional towers. Wind data were collected for approximately a 100 hour period on each ranch. All turbines were shut down during these periods so that no turbine wakes would be present. The data periods were selected by the meteorologist to insure that they occurred during typical spring-summer flow regimes. The terrain features upwind of the site appear to play as significant a role in the flow variability as terrain features within the site.« less
Denver International Airport sensor processing and database
DOT National Transportation Integrated Search
2000-03-01
Data processing and database design is described for an instrumentation system installed on runway 34R at Denver International Airport (DIA). Static (low-speed) and dynamic (high-speed) sensors are installed in the pavement. The static sensors includ...
DOT National Transportation Integrated Search
2009-05-01
Techniques are described for installing instrumentation within highway/railway crossings - to measure vertical pressures under moving highway and railway loadings - using earth pressure cells. Also, techniques are described for installing instrumenta...
Progreso en la puesta en marcha del espectrógrafo BHROS
NASA Astrophysics Data System (ADS)
Díaz, R.; Levato, H.; Casagrande, A.; Piroddi, D.; Yornet, G.; Eikenberry, S.; Gonzalez, F.; Townsend, A.; Godoy, J.; Marun, A.; Gunella, F.; D'Ambra, A.; Warner, C.; Bosch, G.; Donoso, V.; Grosso, M.; Seifer, E.
2017-10-01
We report the advance on the re-assembly and commissioning of the BHROS spectrograph, its associated instrument laboratory and the planned system of telescopes. This is the largest astronomical spectrograph ever assembled in Argentina and the laboratory is also being used for other instrumentation needs of ICATE. We have installed a half meter telescope in order to test the spectrograph with on-sky sources, and we plan to install a network of telescopes feeding it via a multiple optical fiber system. In these first tests we have obtained spectra of the Sun (R100000) and Jupiter and Achernar (R40000). In 2017-2018 we plan to install and test a network of five small telescopes feeding the spectrograph with the collecting area equivalent to that of a one meter telescope, with a cost 10-25 times less in acquisition, transport, installation and operation respect to a conventional monolithic telescope.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... the Cessna Model 525 Citation Jet; Installation of Mid- Continent MD835 Lithium Ion Battery AGENCY... MD835 Lithium Ion (Li-ion) battery. The applicable airworthiness regulations do not contain adequate or... installation of the Mid-Continent Instruments MD835 Lithium Ion battery in the G1000 & GFC700 equipped Cessna...
Void Fraction Instrument operation and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borgonovi, G.; Stokes, T.I.; Pearce, K.L.
This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.
14 CFR 23.1303 - Flight and navigation instruments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must be set to minimize nuisance warning; (f) When an attitude display is installed, the instrument... the attitude reference symbol and the horizon line beyond that necessary for parallax correction. (g... more, excluding the pilot's seats and that are approved for IFR operations, a third attitude instrument...
Superconducting gravimeters reveal unprecedented details of changes related to volcanic processes
NASA Astrophysics Data System (ADS)
Carbone, Daniele; Greco, Filippo; Cannavò, Flavio
2017-04-01
Continuous gravity measurements have been successfully carried out at a number of volcanoes around the world using spring gravimeters. Nevertheless, these instruments do not provide reliable measurements when used in continuous mode for weeks or more, because they are influenced by environmental factors and are subject to instrumental drift. Accordingly, most studies of continuous gravity at active volcanoes have focused on the analysis of changes over time-scales of minutes to a few days. An alternative to spring gravimeters for continuous measurements is given by superconducting gravimeters (SGs) that feature a much higher precision and stability than spring gravimeters. However, even the most portable SGs (e.g., the iGrav® by GWR) are not ideal for installation in the vicinity of active volcanic structures. Indeed, they require AC power at the installation site and some kind of hut or vault to house the instrumentation. At Mt. Etna, the installation of a mini-array of three SGs (distances of 3.5 to 15.5 km from the active craters) was begun in September 2014. To our knowledge, these are the first SGs ever installed on an active volcano. Signals from these instruments show hydrologically-induced components superimposed on small (a few microGal) gravity changes that are related to volcanic processes. Such changes, occurring over periods of minutes to weeks, would not be observable by spring gravimeters due to their intrinsic limitations regarding precision and long-term stability.
NASA Astrophysics Data System (ADS)
Ebeling, C. W.; Coon, C.
2017-12-01
Infrasound sensors are now being installed at Global Seismic Network (GSN) stations meeting certain infrastructure criteria. Manufactured by Hyperion Technology Group, Inc., these instruments (model IFS-3312) have a nominal sensitivity of 140 mV/Pa (at 1 Hz), a full-scale range of ±100 Pa, and a dynamic range of 120 dB. Low power consumption (750 mW at 12 VDC) and small size (153 mm x 178 mm) ease incorporation into the mix of existing GSN instrumentation. The accompanying flexible rosette ("Flexette") acoustic wind-noise reducing system, designed by Project IDA (International Deployment of Accelerometers-IDA), optimally includes 24 inlets, 4 secondary manifolds, and a single primary manifold. Each secondary manifold is connected to 6 inlets and to the primary manifold by 10-ft air hoses, thus eliminating stresses and the greater potential for leaks associated with the use of pipe. While the main design goal was to maximize the reduction of acoustic wind-noise over the widest range of wind speeds possible, consideration of additional criteria resulted in a Flexette base design easily tailored to meet individual station constraints and restrictions, made up of inexpensive (total cost
Lowering SAM Instrument into Curiosity Mars Rover
2011-01-18
In this photograph, technicians and engineers inside a clean room at NASA Jet Propulsion Laboratory, Pasadena, Calif., position NASA Sample Analysis at Mars SAM above the mission Mars rover, Curiosity, for installing the instrument.
Visitor's Computer Guidelines Network Connection Request Instruments Instruments by Telescope IR Instruments telescope before SMARTS took over its operation. A permanently-mounted, dual-channel, optical-IR imager Consortium) with the optical detector since the 1998B semester. The IR array was installed in July 1999
DOT National Transportation Integrated Search
1988-01-01
This report reviews the various techniques considered for instrumenting the Rte. 1-295 cable-stayed bridge over the James River near Richmond, Virginia. From this review an instrumentation plan is developed to meet the following objectives: 1. to det...
14 CFR 91.527 - Operating in icing conditions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... installation or to an airspeed, altimeter, rate of climb, or flight attitude instrument system; (2) Snow or ice... climb, or flight attitude instrument system. (c) Except for an airplane that has ice protection... airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may...
Current status of the facility instrumentation suite at the Large Binocular Telescope Observatory
NASA Astrophysics Data System (ADS)
Rothberg, Barry; Kuhn, Olga; Edwards, Michelle L.; Hill, John M.; Thompson, David; Veillet, Christian; Wagner, R. Mark
2016-07-01
The current status of the facility instrumentation for the Large Binocular Telescope (LBT) is reviewed. The LBT encompasses two 8.4 meter primary mirrors on a single mount yielding an effective collecting area of 11.8 meters or 23 meters when interferometrically combined. The three facility instruments at LBT include: 1) the Large Binocular Cameras (LBCs), each with a 23'× 25' field of view (FOV). The blue optimized and red optimized optical wavelength LBCs are mounted at the prime focus of the SX (left) and DX (right) primary mirrors, respectively. Combined, the filter suite of the two LBCs cover 0.3-1.1 μm, including the addition of new medium-band filters centered on TiO (0.78 μm) and CN (0.82 μm) 2) the Multi-Object Double Spectrograph (MODS), two identical optical spectrographs each mounted at the straight through f/15 Gregorian focus of the primary mirrors. The capabilities of MODS-1 and -2 include imaging with Sloan filters (u, g, r, i, and z) and medium resolution (R ˜ 2000) spectroscopy, each with 24 interchangeable masks (multi-object or longslit) over a 6'× 6' FOV. Each MODS is capable of blue (0.32-0.6 μm) and red (0.5-1.05 μm) wavelength only spectroscopy coverage or both can employ a dichroic for 0.32-1.05 μm wavelength coverage (with reduced coverage from 0.56- 0.57 μm) and 3) the two LBT Utility Camera in the Infrared instruments (LUCIs), are each mounted at a bent-front Gregorian f/15 focus of a primary mirror. LUCI-1 and 2 are designed for seeing-limited (4'× 4' FOV) and active optics using thin-shell adaptive secondary mirrors (0.5'× 0.5' FOV) imaging and spectroscopy over the wavelength range of 0.95-2.5 μm and spectroscopic resolutions of 400 <= R <= 11000 (depending on the combination of grating, slits, and cameras used). The spectroscopic capabilities also include 32 interchangeable multi-object or longslit masks which are cryogenically cooled. Currently all facility instruments are in-place at the LBT and, for the first time, have been on-sky for science observations. In Summer 2015 LUCI-1 was refurbished to replace the infrared detector; to install a high-resolution camera to take advantage of the active optics SX secondary; and to install a grating designed primarily for use with high resolution active optics. Thus, like MODS-1 and -2, both LUCIs now have specifications nearly identical to each other. The software interface for both LUCIs have also been replaced, allowing both instruments to be run together from a single interface. With the installation of all facility instruments finally complete we also report on the first science use of "mixed-mode" operations, defined as the combination of different paired instruments with each mirror (i.e. LBC+MODS, LBC+LUCI, LUCI+MODS). Although both primary mirrors reside on a single fixed mount, they are capable of operating as independent entities within a defined "co-pointing" limit. This provides users with the additional capability to independently dither each mirror or center observations on two different sets of spatial coordinates within this limit.
Some Recent USF Studies at Volcanoes in Central America
NASA Astrophysics Data System (ADS)
McNutt, S. R.
2014-12-01
Scientists at the University of South Florida (USF) have been working in Central America for several decades. Efforts have focused on Physical Volcanology in Nicaragua, GPS in Costa Rica, and assessment of Geothermal projects in El Salvador, amongst others. Two years ago a Seismology Lab was established at USF. Personnel now include three Professors, a Post-Doc, and 4 graduate students. Seismic and GPS networks were installed at Telica Volcano, Nicaragua, in 2010 by Roman, LaFemina and colleagues. Data are recorded on site and recovered several times per year at this persistently restless volcano, which has rates of 5 to 1400 low frequency seismic events per day (Rodgers et al., submitted). Proposals have been submitted to install instruments on other Nicaraguan volcanoes, including seismometers, GPS, infrasound, and lightning sensors. This suite of instruments has proven to be very effective to study a range of volcanic processes. The proposals have not been successful to date (some are pending), and alternative funding sources are being explored. One interesting scientific issue is the presence of strong seasonal effects, specifically a pronounced rainy season and dry season and possible interaction between shallow volcanic processes and surface waters. We are also pursuing a variety of studies that are complementary to the instrumental efforts. One such study is examining volcanic earthquake swarms, with the focus to date on identifying diagnostics. One clear pattern is that peak rates often occur early in swarms, whereas the largest M event occurs late. Additional evidence suggests that the seismic source size grows systematically, especially for events with similar waveforms (families). Recognition of such patterns, linked to processes, may help to improve monitoring and better take advantage of instrumental data to reduce vulnerability from eruptions.
NASA Astrophysics Data System (ADS)
Sweet, J. R.; Beaudoin, B. C.; Barstow, N.; Pfeifer, M.; Anderson, K. R.; Frassetto, A.
2015-12-01
Advances in seismometer design have diversified the range of instruments available for use in temporary field installations. IRIS programs, primarily PASSCAL and the Transportable Array (TA), have helped steer development of these new instruments to meet these evolving needs. PASSCAL operates a small pool of posthole broadband sensors, purpose built for direct burial. Near surface posthole installations are a new, cost effective, and logistically simple technique for broadband emplacement that is an alternative to the vault installations used in portable broadband seismic experiments for nearly 30 years. Direct burial installation is limited to the time and effort required to dig the borehole and emplace the sensor, thus reducing both material costs and time to install. Also, in Alaska, extreme environments and difficult logistics make standard TA tank vaults inappropriate for most sites. TA has developed improved deployment strategies for these environments. There, holes for posthole sensors are hammer- drilled or augered to several meters depth in soil, permafrost, or bedrock and then cased. These emplacement costs are generally less than standard TA vaults. We compare various installation techniques for test cases as well as general deployments of PASSCAL and TA stations. Automated noise performance analyses have been part of the TA throughout its operation, but until recently vault performance for portable installations supported by the PASSCAL program was sparse. In this study, we select a suite of co-located direct burial and surface vault installations and compare their noise performance using probability density functions. Our initial analyses suggest that direct burial sensors have lower noise levels than vault installations on both horizontal and vertical channels across a range of periods spanning <1 s to 100 s. However, most of these initial experiments for PASSCAL were with sensors not purpose built for direct burial and it became obvious that a sensor designed for direct burial was necessary. For the TA, direct emplacement of purpose-built sensors has routinely improved noise levels, particularly beyond about 20 s, by tens of dB. These results suggest that moving towards an instrument pool composed primarily of purpose-built direct burial sensors could yield higher-quality data at lower cost.
Volcano and Earthquake Monitoring Plan for the Yellowstone Volcano Observatory, 2006-2015
,
2006-01-01
To provide Yellowstone National Park (YNP) and its surrounding communities with a modern, comprehensive system for volcano and earthquake monitoring, the Yellowstone Volcano Observatory (YVO) has developed a monitoring plan for the period 2006-2015. Such a plan is needed so that YVO can provide timely information during seismic, volcanic, and hydrothermal crises and can anticipate hazardous events before they occur. The monitoring network will also provide high-quality data for scientific study and interpretation of one of the largest active volcanic systems in the world. Among the needs of the observatory are to upgrade its seismograph network to modern standards and to add five new seismograph stations in areas of the park that currently lack adequate station density. In cooperation with the National Science Foundation (NSF) and its Plate Boundary Observatory Program (PBO), YVO seeks to install five borehole strainmeters and two tiltmeters to measure crustal movements. The boreholes would be located in developed areas close to existing infrastructure and away from sensitive geothermal features. In conjunction with the park's geothermal monitoring program, installation of new stream gages, and gas-measuring instruments will allow YVO to compare geophysical phenomena, such as earthquakes and ground motions, to hydrothermal events, such as anomalous water and gas discharge. In addition, YVO seeks to characterize the behavior of geyser basins, both to detect any precursors to hydrothermal explosions and to monitor earthquakes related to fluid movements that are difficult to detect with the current monitoring system. Finally, a monitoring network consists not solely of instruments, but requires also a secure system for real-time transmission of data. The current telemetry system is vulnerable to failures that could jeopardize data transmission out of Yellowstone. Future advances in monitoring technologies must be accompanied by improvements in the infrastructure for data transmission. Overall, our strategy is to (1) maximize our ability to provide rapid assessments of changing conditions to ensure public safety, (2) minimize environmental and visual impact, and (3) install instrumentation in developed areas.
Developments in neutron beam devices and an advanced cold source for the NIST research reactor
NASA Astrophysics Data System (ADS)
Williams, Robert E.; Rowe, J. Michael
2002-01-01
The last 5 yr has been a period of steady growth in instrument capabilities and utilization at the National Institute of Standards and Technology Center for Neutron Research. Since the installation of the liquid hydrogen cold source in 1995, all of the instruments originally planned for the Cold Neutron Research Facility have been completed and made available to users, and three new thermal neutron instruments have been installed. Currently, an advanced cold source is being fabricated that will better couple the reactor core and the existing network of neutron guides. Many improvements are also being made in neutron optics to enhance the beam characteristics of certain instruments. For example, optical filters will be installed that will increase the fluxes at the two 30-m SANS instruments by as much as two. Sets of MgF 2 biconcave lenses have been developed for SANS that have demonstrated a significant improvement in resolution over conventional pinhole collimation. The recently commissioned high-flux backscattering spectrometer incorporates a converging guide, a large spherically focusing monochromator and analyzer, and a novel phase space transform chopper, to achieve very high intensity while maintaining excellent energy resolution. Finally, a prototype low background, doubly focusing neutron monochromator is nearing completion that will be the heart of a new cold neutron spectrometer, as well as two new thermal neutron triple axis spectrometers.
Rotating Juno for Integrating Instruments
2010-07-12
Once the radiation vault was installed on top of the propulsion module, NASA Juno spacecraft was lifted onto a large rotation fixture. The fixture allows the spacecraft to be turned for convenient access for integrating and testing instruments.
SHARK-NIR: from K-band to a key instrument, a status update
NASA Astrophysics Data System (ADS)
Farinato, Jacopo; Bacciotti, Francesca; Baffa, Carlo; Baruffolo, Andrea; Bergomi, Maria; Bongiorno, Angela; Carbonaro, Luca; Carolo, Elena; Carlotti, Alexis; Centrone, Mauro; Close, Laird; De Pascale, Marco; Dima, Marco; D'Orazi, Valentina; Esposito, Simone; Fantinel, Daniela; Farisato, Giancarlo; Gaessler, Wolfgang; Giallongo, Emanuele; Greggio, Davide; Guyon, Olivier; Hinz, Philip; Lisi, Franco; Magrin, Demetrio; Marafatto, Luca; Mohr, Lars; Montoya, Manny; Pedichini, Fernando; Pinna, Enrico; Puglisi, Alfio; Ragazzoni, Roberto; Salasnich, Bernardo; Stangalini, Marco; Vassallo, Daniele; Verinaud, Christophe; Viotto, Valentina
2016-07-01
SHARK-NIR channel is one of the two coronagraphic instruments proposed for the Large Binocular Telescope, in the framework of the call for second generation instruments, issued in 2014. Together with the SHARK-VIS channel, it will offer a few observing modes (direct imaging, coronagraphic imaging and coronagraphic low resolution spectroscopy) covering a wide wavelength domain, going from 0.5μm to 1.7μm. Initially proposed as an instrument covering also the K-band, the current design foresees a camera working from Y to H bands, exploiting in this way the synergy with other LBT instruments such as LBTI, which is actually covering wavelengths greater than L' band, and it will be soon upgraded to work also in K band. SHARK-NIR has been undergoing the conceptual design review at the end of 2015 and it has been approved to proceed to the final design phase, receiving the green light for successive construction and installation at LBT. The current design is significantly more flexible than the previous one, having an additional intermediate pupil plane that will allow the usage of coronagraphic techniques very efficient in term of contrast and vicinity to the star, increasing the instrument coronagraphic performance. The latter is necessary to properly exploit the search of giant exo-planets, which is the main science case and the driver for the technical choices of SHARK-NIR. We also emphasize that the LBT AO SOUL upgrade will further improve the AO performance, making possible to extend the exo-planet search to target fainter than normally achieved by other 8-m class telescopes, and opening in this way to other very interesting scientific scenarios, such as the characterization of AGN and Quasars (normally too faint to be observed) and increasing considerably the sample of disks and jets to be studied. Finally, we emphasize that SHARK-NIR will offer XAO direct imaging capability on a FoV of about 15"x15", and a simple coronagraphic spectroscopic mode offering spectral resolution ranging from few hundreds to few thousands. This article presents the current instrument design, together with the milestones for its installation at LBT.
Dynamic mechanical analysis and organization/storage of data for polymetric materials
NASA Technical Reports Server (NTRS)
Rosenberg, M.; Buckley, W.
1982-01-01
Dynamic mechanical analysis was performed on a variety of temperature resistant polymers and composite resin matrices. Data on glass transition temperatures and degree of cure attained were derived. In addition a laboratory based computer system was installed and data base set up to allow entry of composite data. The laboratory CPU termed TYCHO is based on a DEC PDP 11/44 CPU with a Datatrieve relational data base. The function of TYCHO is integration of chemical laboratory analytical instrumentation and storage of chemical structures for modeling of new polymeric structures and compounds
Gamma-Radiation Background Onboard Russian Orbital Stations
NASA Astrophysics Data System (ADS)
Dmitrenko, V. V.; Galper, A. M.; Gratchev, V. M.; Kirillov-Ugryumov, V. G.; Krivov, S. V.; Moiseev, A. A.; Ulin, S. E.; Uteshev, Z. M.; Vlasik, K. F.; Yurkin, Yn. T.
Large manned space flight missions have several advantages for carrying out astrophysical and cosmic ray experiments, including the ability to install heavy instruments with large dimensions, increased electrical power and telemetry capacity, and the operation of fixed instruments by qualified personnel (astronauts). The main disadvantage in the use of heavy orbital stations for these experiments is the high level of background radiation generated by the interaction of station material with primary cosmic rays, high energy particles that exist in the magnetosphere of Earth, and albedo radiation from Earth. In some cases, additional radiation may originate from man-made radiation sources installed at the stations. For many years MEPhI have maintained experiments onboard manned Russian space flight missions to study primary gamma-rays at two energy intervals: 0.1 - 8 MeV and 30-600 MeV and electrons with energy more than 30 MeV. During these experiments significant time was spent investigating high energy background radiation onboard the stations. To measure 30-600 MeV gamma-rays, the gas-Cherenkov-scintillation telescope Elena was used. The angular view of this telescope was 10 deg, with a geometrical factor of 0.5 cm2sr. This telescope was operated onboard the orbital stations Salyut-6 and Salyut-7. Usually these stations were operated together with the space missions Soyuz and Progress. For background measurements, cosmonauts installed the telescope at various locations on Salyut, Soyuz and Progress, and oriented it in various directions respectively to the station's axes. During these experiments, the orbital stations were not oriented.
Sofia Observatory Performance and Characterization
NASA Technical Reports Server (NTRS)
Temi, Pasquale; Miller, Walter; Dunham, Edward; McLean, Ian; Wolf, Jurgen; Becklin, Eric; Bida, Tom; Brewster, Rick; Casey, Sean; Collins, Peter;
2012-01-01
The Stratospheric Observatory for Infrared Astronomy (SOFIA) has recently concluded a set of engineering flights for Observatory performance evaluation. These in-flight opportunities have been viewed as a first comprehensive assessment of the Observatory's performance and will be used to address the development activity that is planned for 2012, as well as to identify additional Observatory upgrades. A series of 8 SOFIA Characterization And Integration (SCAI) flights have been conducted from June to December 2011. The HIPO science instrument in conjunction with the DSI Super Fast Diagnostic Camera (SFDC) have been used to evaluate pointing stability, including the image motion due to rigid-body and flexible-body telescope modes as well as possible aero-optical image motion. We report on recent improvements in pointing stability by using an Active Mass Damper system installed on Telescope Assembly. Measurements and characterization of the shear layer and cavity seeing, as well as image quality evaluation as a function of wavelength have been performed using the HIPO+FLITECAM Science Instrument configuration (FLIPO). A number of additional tests and measurements have targeted basic Observatory capabilities and requirements including, but not limited to, pointing accuracy, chopper evaluation and imager sensitivity. SCAI activities included in-flight partial Science Instrument commissioning prior to the use of the instruments as measuring engines. This paper reports on the data collected during the SCAI flights and presents current SOFIA Observatory performance and characterization.
CHARA/FLUOR updates and performance
NASA Astrophysics Data System (ADS)
Mérand, Antoine; Coudé du Foresto, Vincent; Kellerer, Aglaé; ten Brummelaar, Theo; Reess, Jean-Michel; Ziegler, Denis
2006-06-01
In 2002, the Fiber Linked Unit for Optical Recombination (FLUOR) has been moved from the Infrared Optical Telescope Array (IOTA) to the CHARA Array. We present here the main upgrades that followed the installation, the new features installed, including spectral dispersion, and the current capabilities of the instrument.
14 CFR 25.1303 - Flight and navigation instruments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... a slip-skid indicator is required on large airplanes with a third attitude instrument system useable through flight attitudes of 360° of pitch and roll and installed in accordance with § 121.305(k) of this...
Boundary Layer Transition Flight Experiment Overview and In-Situ Measurements
NASA Technical Reports Server (NTRS)
Berger, Karen T.; Anderson, Brian P.; Campbell, Charles H.; Garske, Michael T.; Saucedo, Luis A.; Kinder, Gerald R.
2010-01-01
In support of the Boundary Layer Transition Flight Experiment (BLT FE) Project, a manufactured protuberance tile was installed on the port wing of Space Shuttle Orbiter Discovery for the flights of STS-119, STS-128 and STS-131. Additional instrumentation was installed in order to obtain more spatially resolved measurements downstream of the protuberance. This paper provides an overview of the BLT FE Project. Significant efforts were made to place the protuberance at an appropriate location on the Orbiter and to design the protuberance to withstand the expected environments. A high-level overview of the in-situ flight data is presented, along with a summary of the comparisons between pre- and post-flight analysis predictions and flight data. Comparisons show that predictions for boundary layer transition onset time closely match the flight data, while predicted temperatures were significantly higher than observed flight temperatures.
BLT Flight Experiment Overview and In-Situ Measurements
NASA Technical Reports Server (NTRS)
Anderson, Brian P.; Campbell, Charles H.; Saucedo, Luis A.; Kinder, Gerald R.
2010-01-01
In support of the Boundary Layer Transition Flight Experiment (BLT FE) Project, a manufactured protuberance tile was installed on the port wing of Space Shuttle Orbiter Discovery for the flight of STS-119. Additional instrumentation was also installed in order to obtain more spatially resolved measurements. This paper will provide an overview of the BLT FE Project, including the project history, organizations involved, and motivations for the flight experiment. Significant efforts were made to place the protuberance at an appropriate location on the Orbiter and to design the protuberance to withstand the expected environments. Efforts were also extended to understand the as-fabricated shape of the protuberance and the thermal protection system tile configuration surrounding the protuberance. A high level overview of the in-situ flight data will be presented, along with a summary of the comparisons between pre- and post-flight analysis predictions and flight data.
Construction of a Virtual Scanning Electron Microscope (VSEM)
NASA Technical Reports Server (NTRS)
Fried, Glenn; Grosser, Benjamin
2004-01-01
The Imaging Technology Group (ITG) proposed to develop a Virtual SEM (VSEM) application and supporting materials as the first installed instrument in NASA s Virtual Laboratory Project. The instrument was to be a simulator modeled after an existing SEM, and was to mimic that real instrument as closely as possible. Virtual samples would be developed and provided along with the instrument, which would be written in Java.
Horiuchi, Tsutomu; Tobita, Tatsuya; Miura, Toru; Iwasaki, Yuzuru; Seyama, Michiko; Inoue, Suzuyo; Takahashi, Jun-ichi; Haga, Tsuneyuki; Tamechika, Emi
2012-01-01
We have developed a measurement chip installation/removal mechanism for a surface plasmon resonance (SPR) immunoassay analysis instrument designed for frequent testing, which requires a rapid and easy technique for changing chips. The key components of the mechanism are refractive index matching gel coated on the rear of the SPR chip and a float that presses the chip down. The refractive index matching gel made it possible to optically couple the chip and the prism of the SPR instrument easily via elastic deformation with no air bubbles. The float has an autonomous attitude control function that keeps the chip parallel in relation to the SPR instrument by employing the repulsive force of permanent magnets between the float and a float guide located in the SPR instrument. This function is realized by balancing the upward elastic force of the gel and the downward force of the float, which experiences a leveling force from the float guide. This system makes it possible to start an SPR measurement immediately after chip installation and to remove the chip immediately after the measurement with a simple and easy method that does not require any fine adjustment. Our sensor chip, which we installed using this mounting system, successfully performed an immunoassay measurement on a model antigen (spiked human-IgG) in a model real sample (non-homogenized milk) that included many kinds of interfering foreign substances without any sample pre-treatment. The ease of the chip installation/removal operation and simple measurement procedure are suitable for frequent on-site agricultural, environmental and medical testing. PMID:23202030
Healy, J.H.; Urban, T.C.
1985-01-01
Short-term earthquake prediction requires sensitive instruments for measuring the small anomalous changes in stress and strain that precede earthquakes. Instruments installed at or near the surface have proven too noisy for measuring anomalies of the size expected to occur, and it is now recognized that even to have the possibility of a reliable earthquake-prediction system will require instruments installed in drill holes at depths sufficient to reduce the background noise to a level below that of the expected premonitory signals. We are conducting experiments to determine the maximum signal-to-noise improvement that can be obtained in drill holes. In a 592 m well in the Mojave Desert near Hi Vista, California, we measured water-level changes with amplitudes greater than 10 cm, induced by earth tides. By removing the effects of barometric pressure and the stress related to earth tides, we have achieved a sensitivity to volumetric strain rates of 10-9 to 10-10 per day. Further improvement may be possible, and it appears that a successful earthquake-prediction capability may be achieved with an array of instruments installed in drill holes at depths of about 1 km, assuming that the premonitory strain signals are, in fact, present. ?? 1985 Birkha??user Verlag.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Broadbridge, Christine C.
DOE grant used for partial fulfillment of necessary laboratory equipment for course enrichment and new graduate programs in nanotechnology at the four institutions of the Connecticut State University System (CSUS). Equipment in this initial phase included variable pressure scanning electron microscope with energy dispersive x-ray spectroscopy elemental analysis capability [at Southern Connecticut State University]; power x-ray diffractometer [at Central Connecticut State University]; a spectrophotometer and spectrofluorimeter [at Eastern Connecticut State University; and a Raman Spectrometer [at Western Connecticut State University]. DOE's funding was allocated for purchase and installation of this scientific equipment and instrumentation. Subsequently, DOE funding was allocated tomore » fund the curriculum, faculty development and travel necessary to continue development and implementation of the System's Graduate Certificate in Nanotechnology (GCNT) program and the ConnSCU Nanotechnology Center (ConnSCU-NC) at Southern Connecticut State University. All of the established outcomes have been successfully achieved. The courses and structure of the GCNT program have been determined and the program will be completely implemented in the fall of 2013. The instrumentation has been purchased, installed and has been utilized at each campus for the implementation of the nanotechnology courses, CSUS GCNT and the ConnSCU-NC. Additional outcomes for this grant include curriculum development for non-majors as well as faculty and student research.« less
14 CFR 29.1335 - Flight director systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Flight director systems. 29.1335 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Instruments: Installation § 29.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the...
14 CFR 27.1335 - Flight director systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Flight director systems. 27.1335 Section 27... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Instruments: Installation § 27.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the...
14 CFR 27.1335 - Flight director systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Flight director systems. 27.1335 Section 27... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Instruments: Installation § 27.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the...
14 CFR 29.1335 - Flight director systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Flight director systems. 29.1335 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Instruments: Installation § 29.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the...
14 CFR 29.1335 - Flight director systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Flight director systems. 29.1335 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Instruments: Installation § 29.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the...
The IRIS network site at the Wilcox Solar Observatory
NASA Technical Reports Server (NTRS)
Hoeksema, J. T.; Scherrer, P. H.
1991-01-01
The site for the International Research on the Interior of the Sun (IRIS) instrument housed at the Wilcox Solar Observatory at Stanford University (near San Francisco, USA) is described together with the instrument operation procedure. The IRIS instrument, which measures global oscillations of the sun, operates continuously every clear day since it was installed in August 1987.
Scientific Set of Instruments "Solar Cosmic Rays"
NASA Astrophysics Data System (ADS)
Kuznetsov, S. N.; Bogomolov, A. V.; Galkin, V. I.; Denisov, Yu. I.; Podorolsky, A. N.; Ryumin, S. P.; Kudela, K.; Rojko, J.
A set of scientific instruments SCR (Solar Cosmic Rays) was developed by the scientists of SINP MSU and IEP SAS in order to study relations between the radiation conditions in the near-Earth space and solar activity. This set of instruments was installed on board the satellites CORONAS-I and CORONAS-F launched to the orbit on March 2, 1994, and July 30, 2001, respectively. Detailed description of the instruments is presented.
NASA Astrophysics Data System (ADS)
Heesemann, M.; Davis, E. E.; Scherwath, M.; Kao, H.; Coogan, L. A.; Rogers, G. C.; Wilcock, W. S. D.
2016-12-01
Ocean Networks Canada's (ONC) NEPTUNE observatory provides real-time access to sensors on the Endeavour Ridge Segment (Endeavour)—a focus site on the Juan de Fuca Ridge System that is complementary to one on Axial Volcano that is connected through the Ocean Observatories Initiative's (OOI) Cabled Array. While first instruments (including cameras, a short-period seismometer, and vent monitoring instruments) installed at the Main Endeavour vent field have been sending data since summer 2010, unreliable extension cables precluded continuous time-series from other nearby locations. With the successful installation of four extension cables, the summer of 2016 represents an important milestone in the instrumentation of the Endeavour Ridge Segment. We will present an overview of the data that are available in near real-time from Endeavour and new instrumentation that is scheduled for installation in 2017, and highlight first results derived from the new seismo-tectonic network now in operation. This network consists of three short-period seismometers (Mothra Field, Main Endeavour Field, Regional Circulation North), one broadband seismometer (western Ridge Flank), and four bottom pressure recorders (Mothra Field, Regional Circulation South, Main Endeavour Field, western Ridge Flank). The pressure recorders will provide both seismic and oceanographic data, and allow to measure differential vertical motion among the sites. We will also highlight a new technique to determine long period seafloor deformation from broadband seismometer mass-position measurements, using data from the Ridge Flank instrument as an example.
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...
14 CFR 23.1327 - Magnetic direction indicator.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Magnetic direction indicator. 23.1327... Instruments: Installation § 23.1327 Magnetic direction indicator. (a) Except as provided in paragraph (b) of this section— (1) Each magnetic direction indicator must be installed so that its accuracy is not...
DOT National Transportation Integrated Search
1999-05-01
Sensors were installed in 18 test sections to continuously monitor temperature, moisture, and frost within the pavement structure, and 33 test sections were instrumented to monitor strain, deflection and pressure generated by environmental cycling an...
Labbaf, Hossein; Shakeri, Leila; Orduie, Reza; Bastami, Farshid
2015-01-01
Apical debris extrusion (DE) subsequent to root canal instrumentation, is one of the most important causes of endodontic flare-ups. The aim of this study was to compare the amount of DE after root canal instrumentation using nickel-titanium (NiTi) hand files with step-back manual technique or installed on reciprocating handpiece. This study was conducted on mesiobuccal (MB) roots of extracted maxillary first molars (n=20) and roots of mandibular premolars (n=20) that were randomly divided into two groups (n=20) according to the armamentarium used for canal preparation (air-driven reciprocating handpiece or hand instrumentation). In each group, the MB and premolar roots were prepared with the main apical sizes of 35 and 40, respectively. The extruded debris were collected and weighed. Finally, the mean dry weights were compared using ANOVA and t-test, and Tukey's Multiple Comparisons Procedures were used to determine the significant differences in amounts of DE. The level of significance was set at 0.05. Regardless of the type of teeth, the mean values of DE, were significantly lower in the handpiece group (P<0.0001). In addition, significantly lower amounts of DE was observed in premolars in similar group (P<0.001). However, this difference was not significant in MB roots of molars (P=0.20). Root canal preparation with reciprocating handpiece can lead to significantly lower debris extrusion than the manual step-back technique. In handpiece-prepared canals, the amount of extruded debris was significantly lower in premolar teeth.
The NetQuakes Project - Seeking a Balance Between Science and Citizens.
NASA Astrophysics Data System (ADS)
Luetgert, J. H.; Oppenheimer, D. H.
2012-12-01
The challenge for any system that uses volunteer help to do science is to dependably acquire quality data without unduly burdening the volunteer. The NetQuakes accelerograph and its data acquisition system were created to address the recognized need for more densely sampled strong ground motion recordings in urban areas to provide more accurate ShakeMaps for post-earthquake disaster assessment and to provide data for structural engineers to improve design standards. The recorder has 18 bit resolution with ±3g internal tri-axial MEMS accelerometers. Data are continuously recorded at 200 sps into a 1-2 week ringbuffer. When triggered, a miniSEED file is sent to USGS servers via the Internet. Data can also be recovered from the ringbuffer by a remote request through the NetQuakes servers. Following a power failure, the instrument can run for 36 hours using its internal battery. We rely upon cooperative citizens to host the dataloggers, provide power and Internet connectivity and perform minor servicing. Instrument and battery replacement are simple tasks that can be performed by hosts, thus reducing maintenance costs. Communication with the instrument to acquire data or deliver firmware is accomplished by file transfers using NetQuakes servers. The client instrument initiates all client-server interactions, so it safely resides behind a host's firewall. A connection to the host's LAN, and from there to the public Internet, can be made using WiFi to minimize cabling. Although timing using a cable to an external GPS antenna is possible, it is simpler to use the Network Time Protocol (NTP) to discipline the internal clock. This approach achieves timing accuracy substantially better than a sample interval. Since 2009, we have installed more than 140 NetQuakes instruments in the San Francisco Bay Area and have successfully integrated their data into the near real time data stream of the Northern California Seismic System. An additional 235 NetQuakes instruments have been installed by other regional seismic networks - all communicating via the common NetQuakes servers.
Seismic Station Installation Orientation Errors at ANSS and IRIS/USGS Stations
Ringler, Adam T.; Hutt, Charles R.; Persfield, K.; Gee, Lind S.
2013-01-01
Many seismological studies depend on the published orientations of sensitive axes of seismic instruments relative to north (e.g., Li et al., 2011). For example, studies of the anisotropic structure of the Earth’s mantle through SKS‐splitting measurements (Long et al., 2009), constraints on core–mantle electromagnetic coupling from torsional normal‐mode measurements (Dumberry and Mound, 2008), and models of three‐dimensional (3D) velocity variations from surface waves (Ekström et al., 1997) rely on accurate sensor orientation. Unfortunately, numerous results indicate that this critical parameter is often subject to significant error (Laske, 1995; Laske and Masters, 1996; Yoshizawa et al., 1999; Schulte‐Pelkum et al., 2001; Larson and Ekström, 2002). For the Advanced National Seismic System (ANSS; ANSS Technical Integration Committee, 2002), the Global Seismographic Network (GSN; Butler et al., 2004), and many other networks, sensor orientation is typically determined by a field engineer during installation. Successful emplacement of a seismic instrument requires identifying true north, transferring a reference line, and measuring the orientation of the instrument relative to the reference line. Such an exercise is simple in theory, but there are many complications in practice. There are four commonly used methods for determining true north at the ANSS and GSN stations operated by the USGS Albuquerque Seismological Laboratory (ASL), including gyroscopic, astronomical, Global Positioning System (GPS), and magnetic field techniques. A particular method is selected based on site conditions (above ground, below ground, availability of astronomical observations, and so on) and in the case of gyroscopic methods, export restrictions. Once a north line has been determined, it must be translated to the sensor location. For installations in mines or deep vaults, this step can include tracking angles through the one or more turns in the access tunnel leading to the vault (e.g., GSN station WCI in Wyandotte Cave, Indiana). Finally, the third source of error comes from the ability of field engineers to orient the sensor relative to the reference line. In order to quantify bounds on the errors in each step in the orientation process, we conducted a series of tests at the ASL using twelve GSN and ANSS field engineers. The results from this exercise allow us to estimate upper bounds on the precision of our ability to orient instruments, as well as identify the sources of error in the procedures. We are also able to identify systematic bias of various true‐north‐finding methods relative to one another. Although we are unable to estimate the absolute accuracy of our orientation measurements due to our inability to identify true north without some error, the agreement between independent methods for finding true north provides confidence in the different approaches, assuming no systematic bias. Finally, our study neglects orientation errors that are beyond the control of the field engineer during a station visit. These additional errors can arise from deviations in the sensitive axes of the instruments relative to the case markings, processing errors (Holcomb, 2002) when comparing horizontal orientations relative to other sensors (e.g., borehole installations), and deviations of the sensitive axes of instruments from true orthogonality (e.g., instruments with separate modules such as the Streckeisen STS‐1).
Milestones on the way to a reconfigurable automotive instrument cluster
NASA Astrophysics Data System (ADS)
Knoll, Peter M.; Kosmowski, Bogdan B.
2002-06-01
Nowadays, the car driver are faced with a rapidly increasing flood of information. In addition to established information systems (car radio, vehicle monitoring, mobile phones), high class vehicles feature navigation systems almost as standard. In the current decade, driver assistance and collision avoidance systems will appear in vehicles. Hence, there is an increasing demand for supplying the driver with more information that help him to drive safer and more economical. The price decline in the computer market and the availability of powerful graphic hard- and software concepts make it possible to enhance the classical functions of the instrument board to an interactive multifunctional information panel - an interface between information systems of the car and the driver. Therefore, the question of additional visual and cognitive stress, and a possible distraction of the driver by the large amount of information, and its complexity becomes predominant. Reconfigurable instruments, based on a microprocessor controlled active matrix color display, provide a powerful alternative to the usual mechanical/electromechanical instrument clusters in vehicles. They will help to strengthen passive safety, they adapt to user and situation requirements, and they are easy to install, to configure, and to maintain. Reconfigurable instruments in future cars will have a high impact on traffic since they can provide the driver with much more information, presenting it in a way that is flexibly matched to the importance of particular data and to the ergonomic properties of the driver. The functions are manifold and span from classical driver information like speed to navigation prompts and ultimately to video and multimedia access.
DOT National Transportation Integrated Search
1994-08-19
This order establishes interim procedures to approve special instrument approach : operations using privately owned DGPS installations at U.S. and foreign airports/ : runways. It identifies specific criteria, not presently found in existing : standar...
Analysis of pavement response data and use of nondestructive testing for improving pavement design.
DOT National Transportation Integrated Search
2006-08-01
The first fully instrumented flexible pavement test section in Maine was constructed in Fall, 2005. This paper presents : the description of the instruments, their installation, and analysis of temperature and stress-strain data collected so far. : T...
Seasonal instrumentation of SHRP pavements, the Ohio State University : executive summary.
DOT National Transportation Integrated Search
1998-06-11
Environmental instruments to measure temperature, soil moisture and frost depth were installed at five test sections of the SHRP pavement project on U.S. 23 north of Delaware, Ohio. At three of these locations tensiometers, which a designed to measur...
Seasonal instrumentation of SHRP pavements, the Ohio State University : final report.
DOT National Transportation Integrated Search
1998-09-01
Environmental instruments to measure temperature, soil moisture and frost depth were installed at five test sections of the SHRP pavement project on U.S. 23 north of Delaware, Ohio. At three of these locations tensiometers, which a designed to measur...
Characterization of the Effect of Wing Surface Instrumentation on UAV Airfoil Performance
NASA Technical Reports Server (NTRS)
Ratnayake, Nalin A.
2009-01-01
Recently proposed flight research at NASA Dryden Flight Research Center (DFRC) has prompted study into the aerodynamic effects of modifications made to the surfaces of laminar airfoils. The research is focused on the high-aspect ratio, laminar-flow type wings commonly found on UAVs and other aircraft with a high endurance requirement. A broad range of instrumentation possibilities, such as structural, pressure, and temperature sensing devices may require the alteration of the airfoil outer mold line as part of the installation process. This study attempts to characterize the effect of installing this additiona1 instrumentation on key airfoil performance factors, such as transition location, lift and drag curves, and stall point. In particular, the general case of an airfoil that is channeled in the spanwise direction is considered, and the impact on key performance characteristics is assessed. Particular attention is focused on exploring the limits of channel depth and low-Reynolds number on performance and stall characteristics. To quantify the effect of increased skin friction due to premature transition caused by protruding or recessed instrumentation, two simplified, conservative scenarios are used to consider two potential sources of diaturbance: A) that leading edge alterations would cause linearly expanding areas (triangles) of turbulent flow on both surfaces of the wing upstream of the natural transition point, and B) that a channel or bump on the upper surface would trip turbulent flow across the whole upper surface upstream of the natural transition point. A potentially more important consideration than the skin friction drag increment is the change in overall airfoil performance due to the installation of instrumentation along most of the wingspan. To quantify this effect, 2D CFD simulations of the flow over a representative mid-span airfoil section were conducted in order to assess the change in lift and drag curves for the airfoil in the presence of disturbed flow due to the installed instrumentation. A discussion as to the impact on high-altitude and low-speed operation of this and similar aircraft is provided.
NASA Astrophysics Data System (ADS)
Abbasi Baghbadorani, A.; Aderhold, K.; Bloomquist, D.; Frassetto, A.; Miller, P. E.; Busby, R. W.
2017-12-01
Starting in 2014, the IRIS Transportable Array facility began to install and operate seismic stations in Alaska and western Canada. By the end of the project, the full deployment of the array will cover a grid of 280 stations spaced about 85 km apart covering all of mainland Alaska and parts of the Yukon, British Columbia, and the Northwest Territories. Approximately 200 stations will be operated directly by IRIS through at least 2019. A key aspect of the Alaska TA is the need for stations to operate autonomously, on account of the high cost of installation and potential subsequent visits to remote field-sites to repair equipment. The TA is using newly developed broadband seismometers Streckeisen STS-5A and Nanometrics Trillium-120PH, designed for installation in shallow posthole emplacements. These new instruments were extensively vetted beforehand, but they are still relatively new to the TA inventory. Here we will assess their performance under deployment conditions and after repeated commercial shipping and travel to the field. Our objective is to provide a thorough accounting of the identified failures of the existing inventory of posthole instruments. We will assess the practices and results of instrument testing by the PASSCAL Instrument Center/Array Operations Facility (PIC/AOF), Alaska Operations Center (AOC), and broadband seismic sensor manufacturers (Streckeisen, Nanometrics) in order to document potential factors in and stages during the process for instrument failures. This will help to quantify the overall reliability of the TA seismic sensors and quality of TA practices and data collection, and identify potential considerations in future TA operations. Our results show that the overall rate of failure of all posthole instruments is <4% out of 260. This is lower than the rates seen for vault sensor failures in the operation of the Lower 48 Transportable Array. For telemetered stations such as these installed in the TA Alaska array, we also show that noise analyses can capture a failed emplaced sensor and reveal improved station performance after sensor replacement, and that these are key elements in assessing whether or not a sensor should be replaced in the field.
2005-11-10
KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, is being installed in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006.
2005-11-10
KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, is being installed in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006.
2005-11-10
KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006.
2005-11-10
KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006.
The Role of Naturally Occurring Stable Isotopes in Mass Spectrometry, Part II: The Instrumentation
Bluck, Les; Volmer, Dietrich A.
2013-01-01
In the second instalment of this tutorial, the authors explain the instrumentation for measuring naturally occurring stable isotopes, specifically the magnetic sector mass spectrometer. This type of instrument remains unrivalled in its performance for isotope ratio mass spectrometry (IRMS) and the reader is reminded of its operation and its technical advantages for isotope measurements. PMID:23772101
Measurements of matric and water potentials in unsaturated tuff at Yucca Mountain, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thamir, F.; McBride, C.M.
1985-12-31
Two types of instruments were installed in a borehole in order to monitor matric and water potentials of various hydrogeologic units consisting of tuff. The borehole was drilled as part of a study to provide information to the US Department of Energy for their use in evaluating Yucca Mountain, Nevada, for a repository for high-level radioactive waste. Heat-dissipation probes were used to monitor matric potentials and thermocouple psychrometers were used to monitor water potentials. Two major concerns regarding the use of these instruments in deep boreholes are: (1) the effect of length of the lead wires, and (2) the inabilitymore » to recalibrate the instruments after installation. The length of the lead wire contributes to the source resistance and lead capacitance, which affects the signal settling time. Both instruments tested proved to be insensitive to lead-wire length, except when connected to smaller input-impedance data loggers. Thermocouple wires were more sensitive than heat-dissipation probe wires because of their greater resistance and quality of voltmeters used. Two thermocouple psychrometers were installed at every instrument station for backup and verification of data, because the instruments could not be recalibrated in situ. Multiple scanning rather than single-point scanning of the evaporation curve of a thermocouple psychrometer could give more reliable data, especially in differentiating between very wet and very dry environments. An isolated power supply needs to be used for each heat dissipation probe rather than a single power supply for a group of probes to avoid losing data from all probes when one probe malfunctions. This type of system is particularly desirable if the site is unattended by an operator for as long as a month. 20 refs., 13 figs., 2 tabs.« less
Modular Seafloor and Water Column Systems for the Ocean Observatories Initiative Cabled Array
NASA Astrophysics Data System (ADS)
Delaney, J. R.; Manalang, D.; Harrington, M.; Tilley, J.; Dosher, J.; Cram, G.; Harkins, G.; McGuire, C.; Waite, P.; McRae, E.; McGinnis, T.; Kenney, M.; Siani, C.; Michel-Hart, N.; Denny, S.; Boget, E.; Kawka, O. E.; Daly, K. L.; Luther, D. S.; Kelley, D. S.; Milcic, M.
2016-02-01
Over the past decade, cabled ocean observatories have become an increasingly important way to collect continuous real-time data at remote subsea locations. This has led to the development of a class of subsea systems designed and built specifically to distribute power and bandwidth among sensing instrumentation on the seafloor and throughout the water column. Such systems are typically powered by shore-based infrastructure and involve networks of fiber optic and electrical cabling that provide real-time data access and control of remotely deployed instrumentation. Several subsea node types were developed and/or adapted for cabled use in order to complete the installation of the largest North American scientific cabled observatory in Oct, 2014. The Ocean Observatories Initiative (OOI) Cabled Array, funded by the US National Science Foundation, consists of a core infrastructure that includes 900 km of fiber optic/electrical cables, seven primary nodes, 18 seafloor junction boxes, three mooring-mounted winched profiling systems, and three wire-crawling profiler systems. In aggregate, the installed infrastructure has 200 dedicated scientific instrument ports (of which 120 are currently assigned), and is capable of further expansion. The installed system has a 25-year design life for reliable, sustained monitoring; and all nodes, profilers and instrument packages are ROV-serviceable. Now in it's second year of operation, the systems that comprise the Cabled Array are providing reliable, 24/7 real-time data collection from deployed instrumentation, and offer a modular and scalable class of subsea systems for ocean observing. This presentation will provide an overview of the observatory-class subsystems of the OOI Cabled Array, focusing on the junction boxes, moorings and profilers that power and communicate with deployed instrumentation.
NASA Technical Reports Server (NTRS)
1996-01-01
The Hatizyo Hydrographic Observatory, which is one of the essential magnetic observatories in Japan, was established in 1979 and is currently operated by the Hydrographic Department, Maritime Safety Agency. This is the annual report compiled from the results of magnetic observations carried out at the observatory in 1994. As to the instruments used for magnetic observations, the digital recording variometer was replaced by a fluxgate magnetometer in 1986, and one set each of the proton and fluxgate magnetometers was additionally installed in January and October 1992, respectively.
NASA Technical Reports Server (NTRS)
1995-01-01
The Hatizyo Hydrographic Observatory, which is one of the essential magnetic observatories in Japan, was established in 1979 and is currently operated by the Hydrographic Department, Maritime Safety Agency. This is the annual report compiled from the results of magnetic observations carried out at the observatory in 1993. As to the instruments used for magnetic observations, the digital recording variometer was replaced by a fluxgate magnetometer in 1986, and one set each of the proton and fluxgate magnetometers was additionally installed in January and October 1992, respectively.
Field and laboratory calibration of impact plates for measuring coarse bed load transport
USDA-ARS?s Scientific Manuscript database
During 2008-2009, an array of impact plates instrumented with either accelerometers or geophones was installed over a channel spanning weir in the Elwha River in Washington, USA. The impact system is the first permanent installation of its kind in North America. The system was deployed to measure th...
Status and new operation modes of the versatile VLT/NaCo
NASA Astrophysics Data System (ADS)
Girard, Julien H. V.; Kasper, Markus; Quanz, Sascha P.; Kenworthy, Matthew A.; Rengaswamy, Sridharan; Schödel, Rainer; Gallenne, Alexandre; Gillessen, Stefan; Huerta, Nicolas; Kervella, Pierre; Kornweibel, Nick; Lenzen, Rainer; Mérand, Antoine; Montagnier, Guillaume; O'Neal, Jared; Zins, Gérard
2010-07-01
This paper aims at giving an update on the most versatile Adaptive Optics fed instrument to date, the well known and successful NACO*. Although NACO is only scheduled for about two more years† at the Very Large Telescope (VLT), it keeps on evolving with additional operation modes bringing original astronomical results. The high contrast imaging community uses it creatively as a test-bench for SPHERE‡ and other second generation planet imagers. A new visible wavefront sensor (WFS) optimized for Laser Guide Star (LGS) operations has been installed and tested, the cube mode is more and more required for frame selection on bright sources, a seeing enhancer mode (no tip/tilt correction) is now offered to provide full sky coverage and welcome all kind of extragalactic applications, etc. The Instrument Operations Team (IOT) and Paranal engineers are currently working hard at maintaining the instrument overall performances but also at improving them and offering new capabilities, providing the community with a well tuned and original instrument for the remaining time it is being used. The present contribution delivers a non-exhaustive overview of the new modes and experiments that have been carried out in the past months.
The beam diagnostic instruments in Beijing radioactive ion-beam facilities isotope separator on-line
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ma, Y., E-mail: yjma@ciae.ac.cn; Cui, B.; Ma, R.
The beam diagnostic instruments for Beijing Radioactive Ion-beam Facilities Isotope Separator On-Line are introduced [B. Q. Cui, Z. H. Peng, Y. J. Ma, R. G. Ma, B. Tang, T. Zhang, and W. S. Jiang, Nucl. Instrum. Methods 266, 4113 (2008); T. J. Zhang, X. L. Guan, and B. Q. Cui, in Proceedings of APAC 2004, Gyeongju, Korea, 2004, http://www.jacow.org , p. 267]. For low intensity ion beam [30–300 keV/1 pA–10 μA], the beam profile monitor, the emittance measurement unit, and the analyzing slit will be installed. For the primary proton beam [100 MeV/200 μA], the beam profile scanner will bemore » installed. For identification of the nuclide, a beam identification unit will be installed. The details of prototype of the beam diagnostic units and some experiment results will be described in this article.« less
NASA Astrophysics Data System (ADS)
Barnes, C. R.; Best, M. M.; Johnson, F. R.; Phibbs, P.; Pirenne, B.
2009-05-01
NEPTUNE Canada (NC; www.neptunecanada.ca) will complete most of the installation of the world's first regional cabled ocean observatory in late 2009 off Canada's west coast. It will comprise five main observatory nodes (100-2700m water depths) linked by an 800km backbone cable delivering 10kVDC power and 10Gbps communications bandwidth to hundreds of sensors, with a 25-year design life. Infrastructure (100M) and initial operational funding (20M) is secured. University of Victoria (UVic) leads a consortium of 12 Canadian universities, hosts the coastal VENUS cabled observatory, with Ocean Networks Canada (ONC) providing management oversight. Observatory architecture has a trunk and branch topology. Installed in late 2007, the backbone cable loops from/to UVic's Port Alberni shore station. The wet plant's design, manufacture and installation was contracted to Alcatel-Lucent. Each node provides six interface ports for connection of science instrument arrays or extensions. Each port provides dual optical Ethernet links and up to 9kW of electrical power at 400VDC. Junction boxes, designed and built by OceanWorks support up to 10 instruments each and can be daisy- chained. They accommodate both serial and 10/100 Ethernet instruments, and provide a variety of voltages (400V, 48V, 24V, 15V). Backbone equipment has all been qualified and installed; shore station re-equipping is complete; junction boxes are manufactured. A major marine program will deploy nodes and instruments in July-September 2009; instruments to one node will probably be deferred until 2010. Observatory instruments will be deployed in subsurface (boreholes), on seabed, and buoyed through the water column. Over 130 instruments (over 40 different types) will host several hundred sensors; mobile assets include a tethered crawler and a 400m vertical profiler. Experiments will address: earthquake dynamics and tsunami hazards; fluid fluxes in both ocean crust and sediments, including gas hydrates; ocean/climate dynamics, including acidification and nutrient fluxes; deep-sea ecosystems dynamics; and engineering and computer science research. NC's software system interfaces between users and cabled observatory and responds to a three-fold mandate: acquire data from various instruments/sensors underwater; provide lifetime storage and redistribution capabilities for all data; and allow authorized users to remotely and interactively control experiments. Data Management and Archiving System (DMAS) is being developed in-house, with adoption of Service-Oriented Architecture (SOA) and using Web Services to expose the functionality of DMAS' various components. An internal messaging bus allows various functional components to interact through the publish and subscribe paradigm, using Java programming language. DMAS is developing a modern environment for users: data access, data processing and experimentation control within a Web 2.0 environment. This will allow users, on top of data and instrumentation access, to perform data visualization and analysis on-line with either default or custom processing code, as well as simultaneously interacting with each other. These social networking aspects will be within NC's new Oceans 2.0 environment. The observatory is designed to be expandable in its footprint, nodes and instruments and provides a magnificent facility for testing prototypes of new technologies monitored and demonstrated in real-time. NC and ONC invite new scientific and industrial participation, experiments, instrumentation and data services.
Field instrumentation of dowels : executive summary, April 1997.
DOT National Transportation Integrated Search
1997-04-01
Four different types of dowels, 11/2 inch diameter epoxy-coated steel bars, 11/2 inch diameter fiberglass, 1 1/2 deep steel and fiberglass I-beams, were instrumented with strain gages and installed. Forces that developed in these dowel bars due to cu...
Field instrumentation of dowels : final report, May 1997.
DOT National Transportation Integrated Search
1997-04-01
Four different types of dowels, 11/2 inch diameter epoxy-coated steel bars, 11/2 inch diameter fiberglass, 1 1/2 deep steel and fiberglass I-beams, were instrumented with strain gages and installed. Forces that developed in these dowel bars due to cu...
Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A) software management plan
NASA Technical Reports Server (NTRS)
Schwantje, Robert
1994-01-01
This document defines the responsibilites for the management of the like-cycle development of the flight software installed in the AMSU-A instruments, and the ground support software used in the test and integration of the AMSU-A instruments.
Performances and first science results with the VEGA/CHARA visible instrument
NASA Astrophysics Data System (ADS)
Mourard, D.; Tallon, M.; Bério, Ph.; Bonneau, D.; Chesneau, O.; Clausse, J. M.; Delaa, O.; Nardetto, N.; Perraut, K.; Spang, A.; Stee, Ph.; Tallon-Bosc, I.; McAlister, H.; ten Brummelaar, T.; Sturmann, J.; Sturmann, L.; Turner, N.; Farrington, C.; Goldfinger, P. J.
2010-07-01
This paper presents the current status of the VEGA (Visible spEctroGraph and polArimeter) instrument installed at the coherent focus of the CHARA Array, Mount Wilson CA. Installed in september 2007, the first science programs have started during summer 2008 and first science results are now published. Dedicated to high angular (0.3mas) and high spectral (R=30000) astrophysical studies, VEGA main objectives are the study of circumstellar environments of hot active stars or interactive binary systems and a large palette of new programs dedicated to fundamental stellar parameters. We will present successively the main characteristics of the instrument and its current performances in the CHARA environment, a short summary of two science programs and finally we will develop some studies showing the potential and difficulties of the 3 telescopes mode of VEGA/CHARA.
STS-61 art concept of astronauts during HST servicing
1993-11-12
S93-48826 (November 1993) --- This artist's rendition of the 1993 Hubble Space Telescope (HST) servicing mission shows astronauts installing the new Wide Field/Planetary Camera (WF/PC 2). The instruments to replace the original camera and contains corrective optics that compensate for the telescope's flawed primary mirror. During the 11-plus day mission, astronauts are also scheduled to install the Corrective Optics Space Telescope Axial Replacement (COSTAR) -- an optics package that focuses and routes light to the other three instruments aboard the observatory -- a new set of solar array panels, and other hardware and components. The artwork was done for JPL by Paul Hudson.
Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A) software assurance plan
NASA Technical Reports Server (NTRS)
Schwantje, Robert; Smith, Claude
1994-01-01
This document defines the responsibilities of Software Quality Assurance (SOA) for the development of the flight software installed in EOS/AMSU-A instruments, and the ground support software used in the test and integration of the EOS/AMSU-A instruments.
14 CFR 23.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Pitot heat indication systems. 23.1326 Section 23.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Instruments: Installation § 23.1326 Pitot heat indication systems. If a flight instrument pitot heating system...
14 CFR 23.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Pitot heat indication systems. 23.1326 Section 23.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Instruments: Installation § 23.1326 Pitot heat indication systems. If a flight instrument pitot heating system...
14 CFR 23.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Pitot heat indication systems. 23.1326 Section 23.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Instruments: Installation § 23.1326 Pitot heat indication systems. If a flight instrument pitot heating system...
14 CFR 23.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Pitot heat indication systems. 23.1326 Section 23.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Instruments: Installation § 23.1326 Pitot heat indication systems. If a flight instrument pitot heating system...
14 CFR 23.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Pitot heat indication systems. 23.1326 Section 23.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Instruments: Installation § 23.1326 Pitot heat indication systems. If a flight instrument pitot heating system...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
Comparison of a few recording current meters in San Francisco Bay, CA
Cheng, R.T.
1978-01-01
A team of research scientists in the U.S. Geological Survey uses San Francisco Bay, California, as an outdoor laboratory to study complicated interactions of physical, chemical, and biological processes which take place in an estuarine environment. A current meter comparison study was conceived because of the need to select a suitable current meter to meet field requirements for current measurements in the Bay. The study took place in south San Francisco Bay, California, in the spring of 1977. An instrument tower which was designed to support instruments free from the conventional mooring line motions was constructed and emplaced in south San Francisco Bay. During a period of two months, four types of recording current meters have been used in the tests. The four types were: (1) Aanderaa, (2) tethered shroud-impeller, (3) drag-inclinometer, and (4) electromagnetic current meters. With the exception of the electromagnetic current meter, one of each type was mounted on the instrument tower, and one of each type was deployed on moorings near the instrument tower. In addition, a wind anemometer and a recording tide gauge were also installed on the tower. This paper discusses the characteristics of each instrument and the accuracy that each instrument can provide when used in an estuarine environment. We pay special attention to our experiences in the field operation with respect to handling of the instruments and to our experiences working up the raw data in the post-deployment data analysis.
JAERI instrumented spool piece performance in two-phase flow
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colson, J.B.; Gilbert, J.V.
1979-01-01
Instrumented spool pieces to be installed in horizontal piping on the Cylindrical Core Test Facility (CCTF) at the Japanese Atomic Energy Institute (JAERI) have been designed and tested. The instrumented spool pieces will provide measurements from which mass flow rates can be computed. The primary instruments included in the spool pieces are a full-flow turbine, a full-flow perforated drag plate, and a low energy three-beam photon densitometer. Secondary instruments are provided to measured absolute pressure, fluid temperature, and differential pressure across the full-flow perforated drag plate.
NASA Astrophysics Data System (ADS)
Boyce, E. S.; Bierma, R. M.; Willoughby, H.; Feaux, K.; Mattioli, G. S.; Enders, M.; Busby, R. W.
2014-12-01
EarthScope's geodetic component in Alaska, the UNAVCO-operated Plate Boundary Observatory (PBO) network, includes 139 continuous GPS sites and 41 supporting telemetry relays. These are spread across a vast area, from northern AK to the Aleutians. Forty-five of these stations were installed or have been upgraded in cooperation with various partner agencies and currently provide data collection and transmission for more than one group. Leveraging existing infrastructure normally has multiple benefits, such as easier permitting requirements and costs savings through reduced overall construction and maintenance expenses. At some sites, PBO-AK power and communications systems have additional capacity beyond that which is needed for reliable acquisition of GPS data. Where permits allow, such stations could serve as platforms for additional instrumentation or real-time observing needs. With the expansion of the Transportable Array (TA) into Alaska, there is increased interest to leverage existing EarthScope resources for station co-location and telemetry integration. Because of the complexity and difficulty of long-term O&M at PBO sites, however, actual integration of GPS and seismic equipment must be considered on a case-by-case basis. UNAVCO currently operates two integrated GPS/seismic stations in collaboration with the Alaska Earthquake Center, and three with the Alaska Volcano Observatory. By the end of 2014, PBO and TA plan to install another four integrated and/or co-located geodetic and seismic systems. While three of these are designed around existing PBO stations, one will be a completely new TA installation, providing PBO with an opportunity to expand geodetic data collection in Alaska within the limited operations and maintenance phase of the project. We will present some of the design considerations, outcomes, and lessons learned from past and ongoing projects to integrate seismometers and other instrumentation at PBO-Alaska stations. Developing the PBO network as a platform for ongoing research and hazard monitoring equipment may also continue to serve the needs of the research community and the public beyond the sun-setting and completion of EarthScope science plan in 2018.
2008-03-07
Climate researchers from the National Center for Atmospheric Research (NCAR) and several universities install and perform functional checkouts of a variety of sensitive atmospheric instruments on NASA's DC-8 airborne laboratory prior to beginning the ARCTAS mission.
Application of High Speed Digital Image Correlation in Rocket Engine Hot Fire Testing
NASA Technical Reports Server (NTRS)
Gradl, Paul R.; Schmidt, Tim
2016-01-01
Hot fire testing of rocket engine components and rocket engine systems is a critical aspect of the development process to understand performance, reliability and system interactions. Ground testing provides the opportunity for highly instrumented development testing to validate analytical model predictions and determine necessary design changes and process improvements. To properly obtain discrete measurements for model validation, instrumentation must survive in the highly dynamic and extreme temperature application of hot fire testing. Digital Image Correlation has been investigated and being evaluated as a technique to augment traditional instrumentation during component and engine testing providing further data for additional performance improvements and cost savings. The feasibility of digital image correlation techniques were demonstrated in subscale and full scale hotfire testing. This incorporated a pair of high speed cameras to measure three-dimensional, real-time displacements and strains installed and operated under the extreme environments present on the test stand. The development process, setup and calibrations, data collection, hotfire test data collection and post-test analysis and results are presented in this paper.
NASA Astrophysics Data System (ADS)
Pelz, M.; Hoeberechts, M.; Ewing, N.; Davidson, E.; Riddell, D. J.
2014-12-01
Schools on Canada's west coast and in the Canadian Arctic are participating in the pilot year of a novel educational program based on analyzing, understanding and sharing ocean data collected by cabled observatories. The core of the program is "local observations, global connections." First, students develop an understanding of ocean conditions at their doorstep through the analysis of community-based observatory data. Then, they connect that knowledge with the health of the global ocean by engaging with students at other schools participating in the educational program and through supplemental educational resources. Ocean Networks Canada (ONC), an initiative of the University of Victoria, operates cabled ocean observatories which supply continuous power and Internet connectivity to a broad suite of subsea instruments from the coast to the deep sea. This Internet connectivity permits researchers, students and members of the public to download freely available data on their computers anywhere around the globe, in near real-time. In addition to the large NEPTUNE and VENUS cabled observatories off the coast of Vancouver Island, British Columbia, ONC has been installing smaller, community-based cabled observatories. Currently two are installed: one in Cambridge Bay, Nunavut and one at Brentwood College School, on Mill Bay in Saanich Inlet, BC. Several more community-based observatories are scheduled for installation within the next year. The observatories support a variety of subsea instruments, such as a video camera, hydrophone and water quality monitor and shore-based equipment including a weather station and a video camera. Schools in communities hosting an observatory are invited to participate in the program, alongside schools located in other coastal and inland communities. Students and teachers access educational material and data through a web portal, and use video conferencing and social media tools to communicate their findings. A series of lesson plans introduces the teachers and students to cabled observatory technology and instrumentation, including technical aspects and their value in monitoring changing ocean conditions. This presentation will describe the program in more detail and report on our experiences in the first months of the pilot year.
Hubble Space Telescope: Servicing Mission 3A. Media Reference Guide
NASA Technical Reports Server (NTRS)
1999-01-01
Since its launch in April 1990, the Hubble Space Telescope (HST) has provided scientific data and images of unprecedented resolution from which many new and exciting discoveries have been made. The Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit manned servicing missions. The First Servicing Mission (SM1) took place in December 1993 and the Second Servicing Mission (SM2) was flown in February 1997. During these missions, astronauts perform planned repairs and maintenance activities to restore and upgrade the observatory s capabilities. To facilitate this process, the Telescope s designers configured science instruments and several vital engineering subsystems as Orbital Replacement Units (ORU) -- modular packages with standardized fittings accessible to astronauts in pressurized suits. Hubble's Third Servicing Mission has been separated into two parts: Servicing Mission 3A (SM3A) will fly in Fall of 1999 and Servicing Mission 3B (SM3B) is planned for 2001. The principal objective of SM3A is to replace all six gyroscopes that compose the three Rate Sensor Units (RSU). In addition, space-walking astronauts will install a new Advanced Computer that will dramatically increase the computing power, speed, and storage capability of HST. They will change out one of the Fine Guidance Sensors (FGS) and replace a tape recorder with a new Solid State Recorder (SSR). The Extravehicular Activity (EVA) crew also will install a new S-band Single-Access Transmitter (SSAT), and Voltage/Temperature Improvement Kits (VIK) for the Telescope s nickel-hydrogen batteries. Finally, they will begin repair of the multilayer insulation on Hubble s outer surface. During SM3B astronauts will install a new science instrument, the Advanced Camera for Surveys (ACS), and an Aft Shroud Cooling System (ASCS) for the other axial science instruments. They will attach a new cryogenic cooler to the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS). They also will replace the HST flexible Solar Arrays with new high-performance rigid arrays.
2008-03-07
Climate researchers from the National Center for Atmospheric Research (NCAR) and several universities install and perform functional checkouts of a variety of sensitive atmospheric instruments on NASA's DC-8 airborne laboratory prior to beginning the ARCTAS mission.
On the design of the PEPSI spectropolarimeter for the LBT
NASA Astrophysics Data System (ADS)
Ilyin, I.; Strassmeier, K. G.; Woche, M.; Dionies, F.; Di Varano, I.
2011-10-01
We present the design concept of the spectropolarimeter for the high-resolution echelle spectrograph PEPSI to be installed at the 2×8.4 m Large Binocular Telescope (LBT) in Arizona. We discuss the optical key elements, the principles of operations of the instrument and its instrumental polarization effects.
2008-03-07
Climate researchers from the National Center for Atmospheric Research (NCAR) and several universities install and perform functional checkouts of a variety of sensitive atmospheric instruments on NASA's DC-8 airborne laboratory prior to beginning the ARCTAS mission.
Deep data fusion method for missile-borne inertial/celestial system
NASA Astrophysics Data System (ADS)
Zhang, Chunxi; Chen, Xiaofei; Lu, Jiazhen; Zhang, Hao
2018-05-01
Strap-down inertial-celestial integrated navigation system has the advantages of autonomy and high precision and is very useful for ballistic missiles. The star sensor installation error and inertial measurement error have a great influence for the system performance. Based on deep data fusion, this paper establishes measurement equations including star sensor installation error and proposes the deep fusion filter method. Simulations including misalignment error, star sensor installation error, IMU error are analyzed. Simulation results indicate that the deep fusion method can estimate the star sensor installation error and IMU error. Meanwhile, the method can restrain the misalignment errors caused by instrument errors.
Neural Models: An Option to Estimate Seismic Parameters of Accelerograms
NASA Astrophysics Data System (ADS)
Alcántara, L.; García, S.; Ovando-Shelley, E.; Macías, M. A.
2014-12-01
Seismic instrumentation for recording strong earthquakes, in Mexico, goes back to the 60´s due the activities carried out by the Institute of Engineering at Universidad Nacional Autónoma de México. However, it was after the big earthquake of September 19, 1985 (M=8.1) when the project of seismic instrumentation assumes a great importance. Currently, strong ground motion networks have been installed for monitoring seismic activity mainly along the Mexican subduction zone and in Mexico City. Nevertheless, there are other major regions and cities that can be affected by strong earthquakes and have not yet begun their seismic instrumentation program or this is still in development.Because of described situation some relevant earthquakes (e.g. Huajuapan de León Oct 24, 1980 M=7.1, Tehuacán Jun 15, 1999 M=7 and Puerto Escondido Sep 30, 1999 M= 7.5) have not been registered properly in some cities, like Puebla and Oaxaca, and that were damaged during those earthquakes. Fortunately, the good maintenance work carried out in the seismic network has permitted the recording of an important number of small events in those cities. So in this research we present a methodology based on the use of neural networks to estimate significant duration and in some cases the response spectra for those seismic events. The neural model developed predicts significant duration in terms of magnitude, epicenter distance, focal depth and soil characterization. Additionally, for response spectra we used a vector of spectral accelerations. For training the model we selected a set of accelerogram records obtained from the small events recorded in the strong motion instruments installed in the cities of Puebla and Oaxaca. The final results show that neural networks as a soft computing tool that use a multi-layer feed-forward architecture provide good estimations of the target parameters and they also have a good predictive capacity to estimate strong ground motion duration and response spectra.
VISIR upgrade overview and status
NASA Astrophysics Data System (ADS)
Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina
2012-09-01
We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.
Interchangeable end effector tools utilized on the PFMA
NASA Technical Reports Server (NTRS)
Cody, Joe; Carroll, John; Crow, George; Gierow, Paul; Littles, Jay; Maness, Michael; Morrison, Jim
1992-01-01
An instrumented task board, used for measuring forces applied by the Protoflight Manipulator Arm (PFMA) to the task board, was fabricated and delivered to Marshall Space Flight Center. SRS Technologies phased out the existing IBM compatible data acquisition system, used with a instrumented task board, and integrated the force measuring electronic hardware in with the Macintosh II data acquisition system. The purpose of this change was to acquire all data with the same time tag, allowing easier and more accurate data reduction in addition to real-time graphics. A three-dimensional optical position sensing system for determining the location of the PFMA's end effect or in reference to the center of the instrumented task board was also designed and delivered under. An improved task board was fabricated which included an improved instrumented beam design. The modified design of the task board improved the force/torque measurement system by increasing the sensitivity, reliability, load range and ease of maintenance. A calibration panel for the optical position system was also designed and fabricated. The calibration method developed for the position sensors enhanced the performance of the sensors as well as simplified the installation and calibration procedures required. The modifications made under this effort expanded the capabilities of the task board system. The system developed determines the arm's position relative to the task board and measures the signals to the joints resulting from the operator's control signals in addition to the task board forces. The software and hardware required to calculate and record the position of the PFMA during the performance of tasks with the instrumented task board were defined, designed and delivered to MSFC. PFMA joint input signals can be measured from a breakout box to evaluate the sensitivity or response of the arm operation to control commands. The data processing system provides the capability for post processing of time-history graphics and plots of the PFMA positions, the operator's actions, and the PFMA servo reactions in addition to realtime force and position sensor data presentation.
Interchangeable end effector tools utilized on the PFMA
NASA Astrophysics Data System (ADS)
Cody, Joe; Carroll, John; Crow, George; Gierow, Paul; Littles, Jay; Maness, Michael; Morrison, Jim
1992-02-01
An instrumented task board, used for measuring forces applied by the Protoflight Manipulator Arm (PFMA) to the task board, was fabricated and delivered to Marshall Space Flight Center. SRS Technologies phased out the existing IBM compatible data acquisition system, used with a instrumented task board, and integrated the force measuring electronic hardware in with the Macintosh II data acquisition system. The purpose of this change was to acquire all data with the same time tag, allowing easier and more accurate data reduction in addition to real-time graphics. A three-dimensional optical position sensing system for determining the location of the PFMA's end effect or in reference to the center of the instrumented task board was also designed and delivered under. An improved task board was fabricated which included an improved instrumented beam design. The modified design of the task board improved the force/torque measurement system by increasing the sensitivity, reliability, load range and ease of maintenance. A calibration panel for the optical position system was also designed and fabricated. The calibration method developed for the position sensors enhanced the performance of the sensors as well as simplified the installation and calibration procedures required. The modifications made under this effort expanded the capabilities of the task board system. The system developed determines the arm's position relative to the task board and measures the signals to the joints resulting from the operator's control signals in addition to the task board forces. The software and hardware required to calculate and record the position of the PFMA during the performance of tasks with the instrumented task board were defined, designed and delivered to MSFC. PFMA joint input signals can be measured from a breakout box to evaluate the sensitivity or response of the arm operation to control commands. The data processing system provides the capability for post processing of time-history graphics and plots of the PFMA positions, the operator's actions, and the PFMA servo reactions in addition to realtime force and position sensor data presentation.
Flight Test Results for the HST Orbital Systems Test (HOST) Capillary Pump Loop Cooling System
NASA Technical Reports Server (NTRS)
Buchko, M.; Kaylor, M.; Kroliczek, E.; Ottenstein, L.
1999-01-01
The Near Infrared Camera and Multi Object Spectrometer (NICMOS) was installed in the Hubble Space Telescope (MST) in February 1997. Shortly thereafter, the instrument experienced a thermal short in its solid nitrogen dewar system which will significantly shorten the instrument's useful life. A reverse Brayton cycle mechanical refrigerator will be installed during the Third Servicing Mission (SM3) to provide cooling for the instrument, and thereby extend its operations. A Capillary Pump Loop (CPL) and radiator system was designed, built and tested to remove up to 500 watts of heat from the mechanical cryocooler and its associated electronics. The HST Orbital Systems Test (HOST) platform was flown on the Space Shuttle Discovery (STS-95) as a flight demonstration of the cryocooler system, CPL control electronics, and the CPL/Radiator. This paper will present the flight test results and thermal performance of the CPL system in detail.
Measuring gravity currents in the Chicago River, Chicago, Illinois
Oberg, K.A.; Czuba, J.A.; Johnson, K.K.
2008-01-01
Recent studies of the Chicago River have determined that gravity currents are responsible for persistent bidirectional flows that have been observed in the river. A gravity current is the flow of one fluid within another caused by a density difference between the fluids. These studies demonstrated how acoustic Doppler current profilers (ADCP) can be used to detect and characterize gravity currents in the field. In order to better understand the formation and evolution of these gravity currents, the U.S. Geological Survey (USGS) has installed ADCPs and other instruments to continuously measure gravity currents in the Chicago River and the North Branch Chicago River. These instruments include stage sensors, thermistor strings, and both upward-looking and horizontal ADCPs. Data loggers and computers installed at gaging stations along the river are used to collect data from these instruments and transmit them to USGS offices. ?? 2008 IEEE.
Final system instrumentation design package for Decade 80 solar house
NASA Technical Reports Server (NTRS)
1978-01-01
The final configuration of the Decade 80 solar house to monitor and collect system performance data is presented. A review demonstrated by actual operation that the system and the data acquisition subsystem operated satisfactorily and installation of instrumentation was in accordance with the design. This design package is made up of (1) site and system description, (2) operating and control modes, and (3) instrumentation program (including sensor schematic).
Dhawangale, R M; Kawale, S M; Waghmare, Maya; Pandya, G H; Kondawar, V K
2006-01-01
Environmental laboratories carry out measurement and analysis of a number of physical, chemical and biological parameters. Each parameter requires some sort of instrument for its determination. Providing efficient instrumentation services to various departments of the Institute is an stupendous task. Instrumentation services in the form of installation, operation, repair and maintenanace of electro-mechanical equipment requires an in-depth experience and knowledge of the working, fabrication, design and repair of similar type of instruments so that the need of space, installation pre-requisites, budget constraints, availability of essential spares parts could be assessed. The paper discusses the operation of an environmental instrument repairs and maintenance, and audio-visual facilities. Suggestions for drafting of the proper specifications for procurement of laboratory equipments, such as ovens, furnaces, refrigerators, blowers, audio visual aids, and spares and accessories are given in this paper. The paper also gives the detailed information on various aspects that are needed for checking and testing of the equipment against specification before putting it in operational use. Development of a preventive maintenance program involving QC checks and keeping an inventory of essential spares required are also discussed in this paper. It is felt that such services are essential in providing smooth support to carry out research and development activities of the Institute.
Labbaf, Hossein; Shakeri, Leila; Orduie, Reza; Bastami, Farshid
2015-01-01
Introduction: Apical debris extrusion (DE) subsequent to root canal instrumentation, is one of the most important causes of endodontic flare-ups. The aim of this study was to compare the amount of DE after root canal instrumentation using nickel-titanium (NiTi) hand files with step-back manual technique or installed on reciprocating handpiece. Methods and Materials: This study was conducted on mesiobuccal (MB) roots of extracted maxillary first molars (n=20) and roots of mandibular premolars (n=20) that were randomly divided into two groups (n=20) according to the armamentarium used for canal preparation (air-driven reciprocating handpiece or hand instrumentation). In each group, the MB and premolar roots were prepared with the main apical sizes of 35 and 40, respectively. The extruded debris were collected and weighed. Finally, the mean dry weights were compared using ANOVA and t-test, and Tukey’s Multiple Comparisons Procedures were used to determine the significant differences in amounts of DE. The level of significance was set at 0.05. Results: Regardless of the type of teeth, the mean values of DE, were significantly lower in the handpiece group (P<0.0001). In addition, significantly lower amounts of DE was observed in premolars in similar group (P<0.001). However, this difference was not significant in MB roots of molars (P=0.20). Conclusion: Root canal preparation with reciprocating handpiece can lead to significantly lower debris extrusion than the manual step-back technique. In handpiece-prepared canals, the amount of extruded debris was significantly lower in premolar teeth. PMID:26213538
A method for obtaining distributed surface flux measurements in complex terrain
NASA Astrophysics Data System (ADS)
Daniels, M. H.; Pardyjak, E.; Nadeau, D. F.; Barrenetxea, G.; Brutsaert, W. H.; Parlange, M. B.
2011-12-01
Sonic anemometers and gas analyzers can be used to measure fluxes of momentum, heat, and moisture over flat terrain, and with the proper corrections, over sloping terrain as well. While this method of obtaining fluxes is currently the most accurate available, the instruments themselves are costly, making installation of many stations impossible for most campaign budgets. Small, commercial automatic weather stations (Sensorscope) are available at a fraction of the cost of sonic anemometers or gas analyzers. Sensorscope stations use slow-response instruments to measure standard meteorological variables, including wind speed and direction, air temperature, humidity, surface skin temperature, and incoming solar radiation. The method presented here makes use of one sonic anemometer and one gas analyzer along with a dozen Sensorscope stations installed throughout the Val Ferret catchment in southern Switzerland in the summers of 2009, 2010 and 2011. Daytime fluxes are calculated using Monin-Obukhov similarity theory in conjunction with the surface energy balance at each Sensorscope station as well as at the location of the sonic anemometer and gas analyzer, where a suite of additional slow-response instruments were co-located. Corrections related to slope angle were made for wind speeds and incoming shortwave radiation measured by the horizontally-mounted cup anemometers and incoming solar radiation sensors respectively. A temperature correction was also applied to account for daytime heating inside the radiation shield on the slow-response temperature/humidity sensors. With these corrections, we find a correlation coefficient of 0.77 between u* derived using Monin-Obukhov similarity theory and that of the sonic anemometer. Calculated versus measured heat fluxes also compare well and local patterns of latent heat flux and measured surface soil moisture are correlated.
NASA Astrophysics Data System (ADS)
Luetgert, J. H.; Oppenheimer, D. H.; Hamilton, J.
2010-12-01
The USGS seeks accelerograph spacing of 5-10 km in selected urban areas of the US to obtain spatially un-aliased recordings of strong ground motions during large earthquakes. These dense measurements will improve our ability to make rapid post-earthquake assessments of expected damage and contribute to the continuing development of engineering standards for construction. To achieve this goal the USGS and its university partners are deploying “NetQuakes” seismographs, designed to record moderate to large earthquakes from the near field to about 100 km. The instruments have tri-axial Colibrys 2005SF MEMS sensors, clip at 3g, and have 18-bit resolution. These instruments are uniquely designed for deployment in private homes, businesses, public buildings and schools where there is an existing Broadband connection to the Internet. The NetQuakes instruments connect to a local network using WiFi and then via the Internet to USGS servers to a) upload triggered accelerograms in miniSEED format, P arrival times, and computed peak ground motion parameters immediately after an earthquake; b) download software updates; c) respond to requests for log files, execute UNIX scripts, and upload waveforms from long-term memory for quakes with peak motions below the trigger threshold; d) send state-of-health (SOH) information in XML format every 10 minutes; and e) synchronize instrument clocks to 1ms accuracy using the Network Time Protocol. NetQuakes instruments cost little to operate and save about $600/yr/site compared to instruments that transmit data via leased telemetry. After learning about the project through press releases, thousands of citizens have registered to host an instrument at http://earthquake.usgs.gov/netquakes using a Google Map interface that depicts where we seek instrument sites. The website also provides NetQuakes hosts access to waveform images recorded by instruments installed in their building. Since 3/2009, the NetQuakes project has installed over 100 instruments in the San Francisco Bay area, over 30 in the Seattle region, and 20 elsewhere in the US. Five instruments are also deployed in the San Francisco Bay region on San Pablo Dam, operated by the East Bay Municipal Utility District (EBMUD). These instruments provide cost-effective monitoring for EBMUD through free Internet telemetry, and because the USGS monitors instrument SOH, performs all data processing and archiving, and transmits recorded shaking levels to the dam operators via ShakeCast. EBMUD allows the strong motion data from their instruments to be freely available for use by the seismological and engineering communities. The NetQuakes project expects to install 350 instruments by the end of 2011.
Development of an Onboard Strain Recorder
1990-01-01
Investigations ...................... .910 2-3 Strain Sensors of Previous Investigations ..................... 11 2-4 Signal Conditioning of Previous...the time the strain sensor is installed or calibrated. If a maximum stress or force is to be determined, careful structural analysis is required to...such as deckhouse edges have been instrumented as cracks appear. Extreme care concerning placement and orientation of sensor installation is required
Genesis Noble Gas Measurements
NASA Technical Reports Server (NTRS)
Hohenberg, Charles M.
2005-01-01
The original thrust of our Genesis funding was to extend and refine the noble gas analytical capabilities of this laboratory to improve the precision and accuracy of noble gas measurements in order to optimize the scientific return from the Genesis Mission. This process involved both instrumental improvement (supplemented by a SRLIDAP instrument grant) and refinement of technique. The Genesis landing mishap shifted our emphasis to the irregular aluminum heat shield material from the flat collector wafers. This has required redesign of our laser extraction cells to accommodate the longer focal lengths required for laser extraction from non-flat surfaces. Extraction of noble gases from solid aluminum surfaces, rather than thin coatings on transparent substrates has required refinement of controlled-depth laser ablation techniques. Both of these bring new problems, both with potentially higher blanks form larger laser cells and the larger quantities of evaporated aluminum which can coat the sapphire entrance ports. This is mainly a problem for the heavy noble gases where larger extraction areas are required, necessitating the new aluminum vapor containment techniques described below. With the Genesis Mission came three new multiple multiplier noble gas mass spectrometers to this laboratory, one built solely by us (Supergnome-M), one built in collaboration with Nu-Instruments (Noblesse), and one built in collaboration with GVI (Helix). All of these have multiple multiplier detection sections with the Nu-Instruments using a pair of electrostatic quad lenses for isotope spacing and the other two using mechanically adjustable positions for the electron multipliers. The Supergnome-M and Noblesse are installed and running. The GVI instrument was delivered a year late (in March 2005) and is yet to be installed by GVI. As with all new instruments there were some initial development issues, some of which are still outstanding. The most serious of these are performance issues with the miniature channel electron multipliers. The delayed installation of Helix by the GVI is partly due to failure of the initial batch of Burle channel multipliers to perform as expected. A number of the channel multipliers designed for Noblesse by Burle have also failed upon baking. Burle has now refined the design of these and we have installed two of the new multipliers and are assessing their performance. The remaining multipliers Will be upgraded to the new design from Burle once we confirm that the problem has been fixed.
Hydrologic Monitoring in the Deep Subsurface to Support Repository Performance
NASA Astrophysics Data System (ADS)
Hubbell, J. M.; Heath, G. L.; Scott, C. L.
2007-12-01
The INL has installed and operated several vadose and ground water monitoring systems in arid and humid sites to depths of about 200m. Some of these systems have been in continuous operation for over 12 years. It is important that the systems be physically robust, simple, yet versatile enough that it can operate for extended time periods with little or no maintenance. Monitoring instruments are frequently installed and run to characterize the site, collect data during site operation, and continue to run for long-term stewardship, necessitating sensors that can be maintained or serviced. Sensors are carefully chosen based on the perceived data requirements over the life of the site. An emphasis is given on direct measurements such as tensiometers (portable and advanced), neutron probe, drain gauge, temperature, wells or sampling for fluids and gases. Other complementary data can include using TDR/capacitance, radiation detectors, and larger scale geophysical techniques (3-d resistivity and EM) for volumetric measurements. Commercially available instruments may have to be modified for their use at greater depths, to allow multiple instruments in a single borehole or to perform the intended monitoring function. Access tubes (some open at the bottom) can be placed to allow insertion of multiple sensors (radiation, neutron and portable sensors/samplers), future drilling/sampling and to install new instruments at a later time. The installation techniques and backfill materials must be chosen and the measurement technique tested to ensure representative data collection for the parameters of interest. The data collection system can be linked to climatic data (precipitation, barometric pressure, snow depth, runoff, surface water sources) that may influence the site's subsurface hydrology. The instruments are then connected to a real-time automated data collection system that collect, stores, and provides access to the data. These systems have been developed that allow easy access, automatic data quality checks with notification, processing, and presentation of the data in real time through the web. The systems can be designed to manipulate/test the system remotely. Data from several sites will be presented showing that continuous monitoring is necessary to detect rapid changes in the deep vadose zone and ground water at fractured rock sites.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Gulf Research and Development Company is implementing a DOE-sponsored Underground Coal Gasification project in Steeply Dipping Coal Beds (UCG/SDB) in order to assess the economic and technical viability of UCG in SDB. In the Fall 1980 drilling program, 2 vertical and 2 slant process wells; 3 hydrologic and 1 exploratory well and 4 HFEM wells were completed. The Spring, 1981 program will consist of drilling the remaining instrumentation wells necessary to track the progress of the underground reactor in real time. These will consist of: 6 additional High Frequency Electromagnetic wells (HFEM) and 3 extensometer wells (X). These wells willmore » be installed vertically with an expected deviation of two degrees or less.« less
NASA Astrophysics Data System (ADS)
Ageev, E. V.; Altukhov, A. Yu; Malneva, Yu V.; Novikov, A. N.
2018-03-01
The results of the wear resistance investigation of electro sparking coatings, applied using electrode material from electroerosive powders of hard alloy VK-8 (90%) with the addition of powder of high-speed steel of grade R6M5 (10%), are presented. Electro spark coatings were formed on samples of 30KhGSA steel using these electrodes and installation UR-121. The coefficient of friction and the wear rate of the surface of the sample and counterbody were measured on an automated friction machine “Tribometer” (CSM Instruments, Switzerland), controlled by a computer, according to the standard “ball-disk” test scheme.
WETS - Azura Half Scale Testing MOIS Documentation
Nelson, Eric
2015-05-30
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentation and data come from the NREL team participating in this testing.
NASA Technical Reports Server (NTRS)
Wells, Nathan; Studor, George
2009-01-01
This slide presentation reviews the development and construction of the wireless acoustic instruments surrounding the space shuttle's main engines in preparation for STS-129. The presentation also includes information on end-of-life processing and the mounting procedure for the devices.
2008-03-07
Climate researchers from the National Center for Atmospheric Research (NCAR) and several universities install and perform functional checkouts of a variety of sensitive atmospheric instruments on NASA's DC-8 airborne laboratory prior to beginning the ARCTAS mission.
2008-03-07
Climate researchers from the National Center for Atmospheric Research (NCAR) and several universities install and perform functional checkouts of a variety of sensitive atmospheric instruments on NASA's DC-8 airborne laboratory prior to beginning the ARCTAS mission.
2005-12-01
data collected via on-board instrumentation -VxWorks based computer. Each instrument produces a continuous time history record of up to 250...data in multidimensional hierarchies and views. UGC 2005 Institute a high performance data warehouse • PostgreSQL 7.4 installed on dedicated filesystem
DOT National Transportation Integrated Search
1991-01-01
During the construction of the I-295 cable-stayed bridge, an extensive array of mechanical strain gage points were installed in sections of the box girders, pylons, and piers. At each instrumented box girder section, five longitudinal gages were plac...
Moran, Seth C.; Freymueller, Jeff T.; LaHusen, Richard G.; McGee, Kenneth A.; Poland, Michael P.; Power, John A.; Schmidt, David A.; Schneider, David J.; Stephens, George; Werner, Cynthia A.; White, Randall A.
2008-01-01
As magma moves toward the surface, it interacts with anything in its path: hydrothermal systems, cooling magma bodies from previous eruptions, and (or) the surrounding 'country rock'. Magma also undergoes significant changes in its physical properties as pressure and temperature conditions change along its path. These interactions and changes lead to a range of geophysical and geochemical phenomena. The goal of volcano monitoring is to detect and correctly interpret such phenomena in order to provide early and accurate warnings of impending eruptions. Given the well-documented hazards posed by volcanoes to both ground-based populations (for example, Blong, 1984; Scott, 1989) and aviation (for example, Neal and others, 1997; Miller and Casadevall, 2000), volcano monitoring is critical for public safety and hazard mitigation. Only with adequate monitoring systems in place can volcano observatories provide accurate and timely forecasts and alerts of possible eruptive activity. At most U.S. volcanoes, observatories traditionally have employed a two-component approach to volcano monitoring: (1) install instrumentation sufficient to detect unrest at volcanic systems likely to erupt in the not-too-distant future; and (2) once unrest is detected, install any instrumentation needed for eruption prediction and monitoring. This reactive approach is problematic, however, for two reasons. 1. At many volcanoes, rapid installation of new ground-1. based instruments is difficult or impossible. Factors that complicate rapid response include (a) eruptions that are preceded by short (hours to days) precursory sequences of geophysical and (or) geochemical activity, as occurred at Mount Redoubt (Alaska) in 1989 (24 hours), Anatahan (Mariana Islands) in 2003 (6 hours), and Mount St. Helens (Washington) in 1980 and 2004 (7 and 8 days, respectively); (b) inclement weather conditions, which may prohibit installation of new equipment for days, weeks, or even months, particularly at midlatitude or high-latitude volcanoes; (c) safety factors during unrest, which can limit where new instrumentation can safely be installed (particularly at near-vent sites that can be critical for precursor detection and eruption forecasting); and (d) the remoteness of many U.S. volcanoes (particularly those in the Aleutians and the Marianas Islands), where access is difficult or impossible most of the year. Given these difficulties, it is reasonable to anticipate that ground-based monitoring of eruptions at U.S. volcanoes will likely be performed primarily with instruments installed before unrest begins. 2. Given a growing awareness of previously undetected 2. phenomena that may occur before an eruption begins, at present the types and (or) density of instruments in use at most U.S. volcanoes is insufficient to provide reliable early warning of volcanic eruptions. As shown by the gap analysis of Ewert and others (2005), a number of U.S. volcanoes lack even rudimentary monitoring. At those volcanic systems with monitoring instrumentation in place, only a few types of phenomena can be tracked in near-real time, principally changes in seismicity, deformation, and large-scale changes in thermal flux (through satellite-based remote sensing). Furthermore, researchers employing technologically advanced instrumentation at volcanoes around the world starting in the 1990s have shown that subtle and previously undetectable phenomena can precede or accompany eruptions. Detection of such phenomena would greatly improve the ability of U.S. volcano observatories to provide accurate early warnings of impending eruptions, and is a critical capability particularly at the very high-threat volcanoes identified by Ewert and others (2005). For these two reasons, change from a reactive to a proactive volcano-monitoring strategy is clearly needed at U.S. volcanoes. Monitoring capabilities need to be expanded at virtually every volcanic center, regardless of its current state of
NASA Astrophysics Data System (ADS)
Sastri, A. R.; Dewey, R. K.; Pawlowicz, R.; Krogh, J.
2016-02-01
Data from long term deployments of sensors on autonomous, mobile and cabled observation platforms suffer potential quality issues associated with bio-fouling. This issue is of particular concern for optical sensors, such as fluorescence and/or absorbance-based instruments for which light emitting/receiving surfaces are prone to fouling due constant contact with the marine environment. Here we examine signal quality for backscatter, chlorophyll and CDOM fluorescence from a single triplet instrument installed in a ferry box system (nominal depth of 3m) operated by Ocean Networks Canada. The time series consists of 22 months of 8-10 daily transits across the productive waters of the Strait of Georgia, British Columbia, Canada (Nanaimo on Vancouver Island and Vancouver on mainland BC). Instruments were cleaned every 2 weeks since all three instruments experienced significant signal attenuation during that period throughout the year. We experimented with a variety of pre- and post-cleaning measurements in an effort to develop `correction factors' with which to account for the effects of fouling. We found that CDOM fluorescence was especially sensitive to fouling and that correction factors derived from measurements of the fluorescence of standardized solutions successfully accounted for fouling. Similar results were found for chlorophyll fluorescence. Here we present results from our measurements and assess the efficacy of each of these approaches using comparisons against additional instruments less prone to signal attenuation over short periods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hall, B.L.; Baldwin, C.K.; Lachmar, T.E.
2000-03-31
An in situ instrumentation bundle was designed for inclusion in monitoring wells that were installed at the Wasatch Trailer Sales site in Layton, Utah, to evaluate in situ air sparging (IAS) and in-well aeration (IWA). Sensors for the bundle were selected based on laboratory evaluation of accuracy and precision, as well as consideration of size and cost. SenSym pressure transducers, Campbell Scientific, Inc. (CSI) T-type thermocouples, and dissolved oxygen (DO) probes manufactured by Technalithics Inc. (Waco, Texas), were selected for each of the 27 saturated zone bundles. Each saturated zone bundle also included a stirring blade to mix water nearmore » the DO probe. A Figaro oxygen sensor was included in the vadose zone bundle. The monitoring wells were installed by direct push technique to minimize soil disruption and to ensure intimate contact between the 18 inch (46 cm) long screens and the soil. A data acquisition system, comprised of a CSI 21X data logger and four CSI AM416 multiplexers, was used to control the stirring blades and record signals from more than 70 in situ sensors. The instrumentation performed well during evaluation of IAS and IWA at the site. However, the SenSym pressure transducers were not adequately temperature compensated and will need to be replaced.« less
Fast Imaging Solar Spectrograph System in New Solar Telescope
NASA Astrophysics Data System (ADS)
Park, Y.-D.; Kim, Y. H.; Chae, J.; Goode, P. R.; Cho, K. S.; Park, H. M.; Nah, J. K.; Jang, B. H.
2010-12-01
In 2004, Big Bear Solar Observatory in California, USA launched a project for construction of the world's largest aperture solar telescope (D = 1.6m) called New Solar Telescope(NST). University of Hawaii (UH) and Korea Astronomy and Space Science Institute(KASI) partly collaborate on the project. NST is a designed off-axis parabolic Gregorian reflector with very high spatial resolution(0.07 arcsec at 5000A) and is equipped with several scientific instruments such as Visible Imaging Magnetograph (VIM), InfraRed Imaging Magnetograph IRIM), and so on. Since these scientific instruments are focused on studies of the solar photosphere, we need a post-focus instrument for the NST to study the fine structures and dynamic patterns of the solar chromosphere and low Transition Region (TR) layer, including filaments/prominences, spicules, jets, micro flares, etc. For this reason, we developed and installed a fast imaging solar spectrograph(FISS) system on the NST withadvantages of achieving compact design with high spectral resolution and small aberration as well as recording many solar spectral lines in a single and/or dual band mode. FISS was installed in May, 2010 and now we carry out a test observation. In this talk, we introduce the FISS system and the results of the test observation after FISS installation.
Evaluation of antistripping additives.
DOT National Transportation Integrated Search
1989-01-01
Several chemical antistripping additives were used in field installations and compared to a similar installation using hydrated lime. The performance of the installations was monitored periodically, and material that was sampled during construction w...
Astronaut Thermal Exposure: Re-Entry After Low Earth Orbit Rescue Mission
NASA Technical Reports Server (NTRS)
Gillis, David B.; Hamilton, Douglas; Ilcus, Stana; Stepaniak, Phil; Son, Chang; Bue, Grant
2009-01-01
The STS-125 mission, launched May 11, 2009, is the final servicing mission to the Hubble Space Telescope. The repair mission's EVA tasks are described, including: installing a new wide field camera; installing the Cosmic Origins Spectrograph; repairing the Space Telescope Imaging Spectrograph; installing a new outer blanket layer; adding a Soft Capture and Rendezvous System for eventual controlled deorbit in about 2014; replacing the 'A' side Science Instrument Command and Data Handling module; repairing the Advanced Camera for surveys; and, replacing the rate sensor unit gyroscopes, fine guidance sensors and 3 batteries. Additionally, the Shuttle crew cabin thermal environment is described. A CFD model of per person CO2 demonstrates a discrepancy between crew breathing volume and general mid-deck levels of CO2. A follow-on CFD analysis of the mid-deck temperature distribution is provided. Procedural and engineering mitigation plans are presented to counteract thermal exposure upon reentry to the Earth atmosphere. Some of the procedures include: full cold soak the night prior to deorbit; modifying deck stowage to reduce interference with air flow; and early securing of avionics post-landing to reduce cabin thermal load prior to hatch opening. Engineering mitigation activities include modifying the location of the aft starboard ICUs, eliminating the X3 stack and eliminating ICU exhaust air directed onto astronauts; improved engineering data of ICU performance; and, verifying the adequacy of mid-deck temperature control using CFD models in addition to lumped parameter models. Post-mitigation CFD models of mid-deck temperature profiles and distribution are provided.
Transport and installation of the Dark Energy Survey CCD imager
NASA Astrophysics Data System (ADS)
Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken
2012-09-01
The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.
Initial Results Derived from JEM-GLIMS Observations
NASA Astrophysics Data System (ADS)
Sato, M.; Ushio, T.; Morimoto, T.; Kobayashi, N.; Takahashi, Y.; Suzuki, M.; Yamazaki, A.; Inan, U.; Linscott, I.; Hobara, Y.
2012-12-01
In order to identify the spatial distributions and occurrence conditions of TLEs, JEM-GLIMS (Global Lightning and sprIte MeasurementS on JEM-EF) observations from Japanese Experiment Module - Exposed Facility (JEM-EF) at International Space Station (ISS) will start this year. Science instruments of JEM-GLIMS consist of two kinds of optical detectors and two kinds of radio receivers. The optical instruments are two wide FOV CMOS cameras (LSI) and six-channel spectrophotometers (PH). LSI uses a CMOS device with 512x512 pixels as an imaging sensor and uses a CCTV lens with =25 mm/F=1.4 which becomes 28.3x28.3 deg. FOV. LSI-1 equips a wide band optical filter (766-832 nm) and mainly measures lightning emission, while LSI-2 equips a narrowband optical filter (762+/-7 nm) and mainly measures TLE emission. Five of six PH channels employ the optics with 42.7 deg. conical FOV and use photomultiplier tubes (PMTs) as photon detectors. Each channel of these photometers equips an optical band-pass filter to measure N2 1P, 2P, and LBH emissions. One of six photometers employs a wide-FOV optics (86.8 deg.) and wide-band filter to measure N2 1P lightning emission. All these optical instruments are pointed to the nadir direction. In order to detect whistler wave excited by lightning discharges, one VLF receiver (VLFR) is installed. VLFR consists of a 15 cm nadir-directing monopole antenna and an electronics unit recording waveform data with a sampling frequency of 100 kHz with 14-bit resolution. In addition to this, two sets of VHF receivers (VITF) are also installed to measure VHF pulses emitted by lightning discharges. VITF consists of two patch-type antennas separated by 1.5 m and an electronics unit which records pulse data with a sampling frequency of 200 MHz with 8-bit resolution. Thus, the spatial and temporal evolution of lightning and TLEs can be measured by the two optical instruments, while the electrical characteristics of sprite-inducing lightning discharges can be measured by two radio receivers. JEM-GIMS was successfully launched by H-IIB rocket at 02:06:18 UT on July 21, 2012 and transported to ISS by the HTV-3 cargo transfer spaceship. HTV-3 successfully arrived at ISS on July 27 and our JEM-GLIMS instruments will be installed at JEM-EF on August 9. For the period from September 15 to 21 we will carry out the initial checkout operation, and finally we will start continuous TLE observations from the middle of October. At the presentation we will show the test results obtained during the checkout operations and will present the initial results derived from JEM-GLIMS lightning/TLE observations.
Thermal and heat flow instrumentation for the space shuttle Thermal Protection System
NASA Technical Reports Server (NTRS)
Hartman, G. J.; Neuner, G. J.; Pavlosky, J.
1974-01-01
The 100 mission lifetime requirement for the space shuttle orbiter vehicle dictates a unique set of requirements for the Thermal Protection System (TPS) thermal and heat flow instrumentation. This paper describes the design and development of such instrumentation with emphasis on assessment of the accuracy of the measurements when the instrumentation is an integral part of the TPS. The temperature and heat flow sensors considered for this application are described and the optimum choices discussed. Installation techniques are explored and the resulting impact on the system error defined.
Advanced Camera for Surveys Instrument Handbook for Cycle 25 v. 16.0
NASA Astrophysics Data System (ADS)
Avila, R. J.
2017-01-01
The Advanced Camera for Surveys (ACS), a third-generation instrument, was installed in the Hubble Space Telescope during Servicing Mission 3B, on March 7, 2002. Its primary purpose was to increase HST imaging discovery efficiency by about a factor of 10, with a combination of detector area and quantum efficiency that surpasses previous instruments. ACS has three independent cameras that have provided wide-field, high resolution, and ultraviolet imaging capabilities respectively, using a broad assortment of filters designed to address a large range of scientific goals. In addition, coronagraphic, polarimetric, and grism capabilities have made the ACS a versatile and powerful instrument. The ACS Instrument Handbook, which is maintained by the ACS Team at STScI, descr ibes the instrument properties, performance, operations, and calibration. It is the basic technical reference manual for the instrument, and should be used with other documents (listed in Table 1.1) for writing Phase I proposals, detailed Phase II programs, and for data analysis. (See Figure 1.1). In May 2009, Servicing Mission 4 (SM4) successfully restored the ACS Wide Field Camera (WFC) to regular service after its failure in January 2007. Unfortunately, the ACS High Resolution Camera (HRC) was not restored to operation during SM4, so it cannot be proposed for new observations. Nevertheless, this handbook retains description of the HRC to support analysis of archived observations. The ACS Solar Blind Channel (SBC) was unaffected by the January 2007 failure of WFC and HRC. The SBC has remained in steady operation, and was not serviced during SM4. It remains available for new observations.
GOES-R Advanced Base Line Imager Installation
2016-08-30
Team members prepare the Advanced Base Line Imager, the primary optical instrument, for installation on the Geostationary Operational Environmental Satellite (GOES-R) inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.
GOES-R Advanced Base Line Imager Installation
2016-08-30
Team members install the Advanced Base Line Imager, the primary optical instrument, on the Geostationary Operational Environmental Satellite (GOES-R) inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.
GOES-R Advanced Base Line Imager Installation
2016-08-30
The Advanced Base Line Imager, the primary optical instrument, has been installed on the Geostationary Operational Environmental Satellite (GOES-R) inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.
Charles A. Harrison; Susan O’Ney
2002-01-01
We developed procedures for installing prefabricated trapezoidal flumes in deep (10 to 12 feet) drainage ditches to monitor hydrologic functions and provide gauge locations for sampling discharge. Flows from the instrumented basins were generally low, but the ditches were occasionally subject to high flows caused by rain events of 2 to 3 inches or more. These high flow...
Code of Federal Regulations, 2010 CFR
2010-07-01
... REGULATIONS AFFECTING MILITARY RESERVATIONS Firearms and Weapons § 552.98 Purpose. This regulation establishes... dangerous weapons and instruments on Fort Stewart/Hunter Army Airfield (AAF) installations. ...
Code of Federal Regulations, 2012 CFR
2012-07-01
... REGULATIONS AFFECTING MILITARY RESERVATIONS Firearms and Weapons § 552.98 Purpose. This regulation establishes... dangerous weapons and instruments on Fort Stewart/Hunter Army Airfield (AAF) installations. ...
Cloud fraction and cloud base measurements from scanning Doppler lidar during WFIP-2
NASA Astrophysics Data System (ADS)
Bonin, T.; Long, C.; Lantz, K. O.; Choukulkar, A.; Pichugina, Y. L.; McCarty, B.; Banta, R. M.; Brewer, A.; Marquis, M.
2017-12-01
The second Wind Forecast Improvement Project (WFIP-2) consisted of an 18-month field deployment of a variety of instrumentation with the principle objective of validating and improving NWP forecasts for wind energy applications in complex terrain. As a part of the set of instrumentation, several scanning Doppler lidars were installed across the study domain to primarily measure profiles of the mean wind and turbulence at high-resolution within the planetary boundary layer. In addition to these measurements, Doppler lidar observations can be used to directly quantify the cloud fraction and cloud base, since clouds appear as a high backscatter return. These supplementary measurements of clouds can then be used to validate cloud cover and other properties in NWP output. Herein, statistics of the cloud fraction and cloud base height from the duration of WFIP-2 are presented. Additionally, these cloud fraction estimates from Doppler lidar are compared with similar measurements from a Total Sky Imager and Radiative Flux Analysis (RadFlux) retrievals at the Wasco site. During mostly cloudy to overcast conditions, estimates of the cloud radiating temperature from the RadFlux methodology are also compared with Doppler lidar measured cloud base height.
Solar cell power for field instrumentation at White Sands Missile range. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bond, J.W. Jr..; Reckart, D.H. Jr; Milway, W.B.
1978-01-01
The initial phase of an Instrumentation Development Project to explore and document what solar power can do for remote field instrumentation systems is described. The work scope consisted of selection, design, construction, test, and delivery of a solar cell power system for White Sands Missile Range. A Drone Formation Control System Interrogator was selected; a power supply was built and installed in the San Andres Mountain Range at WSMR in late August 1977.
1997-01-18
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility inspect the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) on its handling fixture. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.
1997-01-18
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lower the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) into the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.
1997-01-16
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lower the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) into the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS is HST's first cryogenic instrument -- its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 derees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.
Instrumented Pick Detects Coal/Rock Interface
NASA Technical Reports Server (NTRS)
Wu, T.; Erkes, J. W.
1983-01-01
Instrumented pick installed on cutting drum of coal shearer for longwall mining measures cutting force with strain-gage-bridge load cell. Force signal transmitted to remote recorder. Transmitter located in base of pick assembly. Antenna located in shadow of rotating pick. Changes in characteristics of force signals from pick used to determine whether pick is cutting coal or rock.
1970-03-01
The Apollo Telescope Mount (ATM) was designed and developed by the Marshall Space Flight Center (MSFC) and served as the primary scientific instrument unit aboard Skylab (1973-1979). The ATM consisted of eight scientific instruments as well as a number of smaller experiments. In this image, the thermal unit, that controlled the temperature stability of the ATM, is being installed into a vacuum chamber.
Wind instrument mountings for above-the-cab lookout exposure
Owen P. Cramer; Ralph H. Moltzau
1968-01-01
The lookout tower offers a ready-made platform from which the speed of true unobstructed wind can be measured, then reduced to equivalent of 20-foot wind. Tower-mounted instruments must meet the requirements of a lightning conductor system, but should also be easily installed and removed for storage and maintenance. Lightweight aluminum mountings for catwalk or flat-...
Glatfelter, D.R.; Butch, G.K.
1994-01-01
The study results indicate that installation of streamflow-gaging stations at 15 new sites would improve collection of flood data. Instrumenting the 15 new sites plus 26 existing streamflow-gaging stations with telemetry, preferably data-collection platforms with satellite transmitters, would improve transmission of data to users of the information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bostedt, Christoph
2014-06-30
Christoph Bostedt, a senior staff scientist at SLAC's Linac Coherent Light Source X-ray laser, provides a sneak peek of a powerful new instrument, called LAMP, that is now available for experiments that probe the atomic and molecular realm. LAMP replaces and updates the first instrument at LCLS, dubbed CAMP, which will be installed at an X-ray laser in Germany.
Bostedt, Christoph
2018-01-16
Christoph Bostedt, a senior staff scientist at SLAC's Linac Coherent Light Source X-ray laser, provides a sneak peek of a powerful new instrument, called LAMP, that is now available for experiments that probe the atomic and molecular realm. LAMP replaces and updates the first instrument at LCLS, dubbed CAMP, which will be installed at an X-ray laser in Germany.
NASA Astrophysics Data System (ADS)
Espina, Chad Edward Obedoza
The Wildland Urban-Interface Fire Dynamics Simulator (WFDS) is a computer code that is currently being developed by the National Institute of Standards and Technology (NIST). WFDS has the capability of simulating wildland fire behavior with prescribed elements such vegetative and structural fuel, topography, and weather conditions. In this initial stage of the research, support for the development of WFDS focuses on the evaluation of a wind flow simulation on a very complex, outdoor terrain. This effort is preceded by the fabrication, installation and testing of wind-sensing equipment. Foremost, wind data gathered from different sites using various instruments are compared and evaluated. The data gathered in the Trails community of Rancho Bernardo is then presented and compared to select WFDS simulations. Systems consisting of a wind vane and anemometer are currently installed in the Trails community of Rancho Bernardo. They were installed by Professor Fletcher J. Miller and me using a lift that is attached to a telescoping crane. These instruments will gather the wind data needed to show the behavioral patterns of winds influenced by the topography and obstructions such as trees and houses. They are currently installed on top of light posts. These light posts were picked based on the path of the fire influenced by the Santa Ana winds that ravaged the community in 2007. The data from these instruments were graphically represented using a Matlab code that was developed specifically for the data sets. The Matlab graphing utility plots wind speed and wind direction along with matching polar plots. Other main features also include the ability to set a time range and compare two sites in one plot. There are other wind instruments currently being tested and being analyzed to ensure correct data is being recorded. These instruments will also expand to a wider range the wind data-gathering capabilities vertically. A Sound Detecting and Ranging (SoDAR) unit gathers wind speed and direction from the sound waves, initially emitted by the SoDAR to the atmosphere, that are reflected by the air flow above the unit. Wind data has been compared to the SoDAR unit with data from instruments installed on a meteorological tower operated by the National Oceanic and Atmospheric Administration (NOAA) located in northern California. Two more SoDARs are currently in Texas where initially they were deployed 400 meters apart of each other at an airfield. Also in the same airfield, the wind instrument of an Unmanned Aerial Vehicle (UAV) SuperBat was tested and compared to the SoDARs. Lastly, a self-contained wind instrument (Wind Dart) on a UAV that was developed by the University of Colorado was tested. The instrument was used while attached to the UAV Spectra. A static test was also done in San Diego State University's low speed wind tunnel. The wind data comparison from the SoDAR and meteorological tower in Lodi, California showed close tracking to each other both in wind speed and direction. The comparison of the wind data gathered by the two SoDARs in Texas also showed close tracking to each other. As for the Wind Dart, the data gathered from the instrument and UAV Spectra are not conclusive enough to validate the abilities of the Wind Dart. The experimental procedure in testing the Wind Dart on a moving platform must be further developed. Before the aerial test of the Wind Dart, it was first tested at San Diego State University's low speed tunnel. The detected wind speed by the Wind Dart closely matches the prescribed wind speed of the wind tunnel. The data between the UAV SuperBat and SoDARs showed close tracking. Data collected by the Rancho Bernardo wind instruments shows cyclical wind patterns in the neighborhood. Initial evaluation of select WFDS simulations show data that mimics data gathered from the field.
Design of a portable dose rate detector based on a double Geiger-Mueller counter
NASA Astrophysics Data System (ADS)
Wang, Peng; Tang, Xiao-Bin; Gong, Pin; Huang, Xi; Wen, Liang-Sheng; Han, Zhen-Yang; He, Jian-Ping
2018-01-01
A portable dose rate detector was designed to monitor radioactive pollution and radioactive environments. The portable dose detector can measure background radiation levels (0.1 μSv/h) to nuclear accident radiation levels (>10 Sv/h). Both automatic switch technology of a double Geiger-Mueller counter and time-to-count technology were adopted to broaden the measurement range of the instrument. Global positioning systems and the 3G telecommunication protocol were installed to prevent radiation damage to the human body. In addition, the Monte Carlo N-Particle code was used to design the thin layer of metal for energy compensation, which was used to flatten energy response The portable dose rate detector has been calibrated by the standard radiation field method, and it can be used alone or in combination with additional radiation detectors.
NASA Astrophysics Data System (ADS)
Willgoose, G. R.
2006-12-01
In humid catchments the spatial distribution of soil water is dominated by subsurface lateral fluxes, which leads to a persistent spatial pattern of soil moisture principally described by the topographic index. In contrast, semi-arid, and dryer, catchments are dominated by vertical fluxes (infiltration and evapotranspiration) and persistent spatial patterns, if they exist, are subtler. In the first part of this presentation the results of a reanalysis of a number of catchment-scale long-term spatially-distributed soil moisture data sets are presented. We concentrate on Tarrawarra and SASMAS, both catchments in Australia that are water-limited for at least part of the year and which have been monitored using a variety of technologies. Using the data from permanently installed instruments (neutron probe and reflectometry) both catchments show persistent patterns at the 1-3 year timescale. This persistent pattern is not evident in the field campaign data where field portable instruments (reflectometry) instruments were used. We argue, based on high-resolution soil moisture semivariograms, that high short-distance variability (100mm scale) means that field portable instrument cannot be replaced at the same location with sufficient accuracy to ensure deterministic repeatability of soil moisture measurements from campaign to campaign. The observed temporal persistence of the spatial pattern can be caused by; (1) permanent features of the landscape (e.g. vegetation, soils), or (2) long term memory in the soil moisture store. We argue that it is permanent in which case it is possible to monitor the soil moisture status of a catchment using a single location measurement (continuous in time) of soil moisture using a permanently installed reflectometry instrument. This instrument will need to be calibrated to the catchment averaged soil moisture but the temporal persistence of the spatial pattern of soil moisture will mean that this calibration will be deterministically stable with time. In the second part of this presentation we will explore aspects of the calibration using data from the SASMAS site using the multiscale spatial resolution data (100m to 10km) provided by permanently installed reflectometry instruments, and how this single site measurement technique may complement satellite data.
Key Science Instrument Installed into Webb Structure
2013-05-03
A technician is installing the bolts that will hold the MIRI, or Mid-Infrared Instrument, to the composite Integrated Science Instrument Module (ISIM) structure, or the black frame. The MIRI is attached to a balance beam, called the Horizontal Integration Tool (HIT), hanging from a precision overhead crane. That's the same tool that Hubble engineers used to prepare hardware for its servicing missions. Photo Credit: NASA/Chris Gunn; Text Credit: NASA/Laura Betz ---- Engineers worked meticulously to implant the James Webb Space Telescope's Mid-Infrared Instrument into the ISIM, or Integrated Science Instrument Module, in the cleanroom at NASA's Goddard Space Flight Center in Greenbelt, Md. As the successor to NASA's Hubble Space Telescope, the Webb telescope will be the most powerful space telescope ever built. It will observe the most distant objects in the universe, provide images of the first galaxies formed and see unexplored planets around distant stars. For more information, visit: www.jwst.nasa.gov NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
Transport of atrazine versus bromide and δO18 in sand
Tindall, James A.; Friedel, Michael J.
2016-01-01
The objective of this research was to determine the process of atrazine transport compared to bromide and δO18 transport in sands near Denver. Three 1.5 × 2 × 1.5-m plots were installed and allowed to equilibrate for 2 years before research initiation and were instrumented with 1.5 × 2-m zero-tension pan lysimeters installed at 1.5-m depths. Additionally, each plot was instrumented with suction lysimeters, tensiometers, time domain reflectometry (TDR) moisture probes, and thermocouples (to measure soil temperature) at 15-cm depth increments. All plots were enclosed with a raised frame (of 8-cm height) to prevent surface runoff. During the 2-year period before research began, all suction and pan lysimeters were purged monthly and were sampled for fluids immediately prior to atrazine and KBr application to obtain background concentrations. Atrazine illustrated little movement until after a significant rainfall event, which peaked concentrations at depths of about 90 to 135 cm. Both Br− and δO18 moved rapidly through the soil, probably owing to soil porosity and anion exclusion for Br−. Concentrations of atrazine exceeding 5.0 μL−1 were observed with depth (90 to 150 cm) after several months. It appears that significant rainfall events were a key factor in the movement of atrazine in the sand, which allowed the chemicals to move to greater depths and thus avoid generally found biodegradation processes.
NASA Astrophysics Data System (ADS)
Virtanen, Heikki; Raja-Halli, Arttu
2017-11-01
The new dual-sphere superconducting gravimeter (SG) OSG-073 was installed at Metsähovi Geodetic Fundamental Station in Southern Finland in February 2014. Its two gravity sensors (N6 and N7) are side by side, not one on top of the other as in other earlier dual-sensor installations. The old SG T020 has been recording continuously since 1994-2016. This instrument is situated in the same room at a distance of 3 m from the dual-sphere SG. T020 observed simultaneously for 1 year with N6 and for 15 months with N7. The gravity signals observed by N6 and N7 are very similar, except for the initial exponential drift. We have calculated the power spectral density to compare the noise level of these instruments with other low noise SGs. In this paper we present the observed differences in the gravity time series of T020 and OSG-073, induced by local hydrology. We have observed a clear 10-20 nms-2 difference in the seasonal gravity variations of OSG-073 and T020. We have found clear gravity differences due to transient effect of heavy precipitation. In addition, we compare the remote effect on gravity due to variations in the Baltic Sea level and total water storage in Finland to the observed gravity signal. We also present modeling results of gravity variations due to local hydrology.
McClellan PV system installation provides key lessons
NASA Astrophysics Data System (ADS)
Kauffman, W. R.
Design features and lessons learned in the installation of a 40 kWp solar cell array to supply power to a market on an airbase are outlined. The fixed-position modules interface with an inverter, ac and dc switchgear, controls, instrumentation, and an energy management system. The power control unit has a peak power tracking feature to maximize output from the 1142 cell modules. The inverter has functioned at over 98 percent efficiency near the 25 kW design range of the array. Moisture sealing to prevent ground faults was found necessary during the installation of the underground cabling.
Calibration of a Computer Based Instrumentation for Flight Research
NASA Technical Reports Server (NTRS)
Forsyth, T. J.; Reynolds, R. S. (Technical Monitor)
1997-01-01
NASA Ames Research Center has been investigating a Differential Global Positioning System (DGPS) for future use as a Category II/III landing system. The DGPS navigation system was developed and installed on a B200 King Air aircraft. Instrumentation that is not calibrated and verified as a total operating system can have errors or not work correctly. Systems need to be checked for cross talk and that they work together accurately. It is imperative that the instrumentation and computer do not affect aircraft avionics and instrumentation needed for aircraft operation. This paper discusses calibration and verification principles of a computer based instrumentation airborne system.
Installing scientific instruments into a cold LHe dewar - The Gravity Probe B approach
NASA Technical Reports Server (NTRS)
Parmley, Richard T.; Kusunic, Keith; Reynolds, Gary; Stephenson, Sam; Alexander, Keith
1990-01-01
Gravity Probe B is an orbital test of Einstein's general theory of relativity using gyroscopes. The precession of the gyroscopes will measure both the geodetic effect (6.6 arcsec/yr) through the curved space-time surrounding the earth and the motional effect (0.042 arcsec/yr) due to the rotating earth dragging space-time around with it. To achieve the extraordinary accuracies needed to measure these small precessions, it is necessary to have the gyroscopes operating in the following environments: a vacuum of less than 10 exp -10 torr; an acceleration level of less than 10 exp -10 g's; a magnetic field of less than 10 exp -7 gauss; and a temperature near 2 K. This paper discusses designs that allow scientific instruments to be installed into a dewar at 4.2 K. Methods for structurally supporting the instruments, transferring heat across joints at low temperature in vacuum, and excluding air during the insertion process are discussed. The structural support method is designed for Shuttle launch loads.
Progress on PEEM3 -- An Aberration Corrected X-Ray Photoemission Electron Microscope at the ALS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacDowell, A. A.; Feng, J.; DeMello, A.
2007-01-19
A new ultrahigh-resolution photoemission electron microscope called PEEM3 is being developed and built at the Advanced Light Source (ALS). An electron mirror combined with a much-simplified magnetic dipole separator is to be used to provide simultaneous correction of spherical and chromatic aberrations. It is installed on an elliptically polarized undulator (EPU) beamline, and will be operated with very high spatial resolution and high flux to study the composition, structure, electric and magnetic properties of complex materials. The instrument has been designed and is described. The instrumental hardware is being deployed in 2 phases. The first phase is the deployment ofmore » a standard PEEM type microscope consisting of the standard linear array of electrostatic electron lenses. The second phase will be the installation of the aberration corrected upgrade to improve resolution and throughput. This paper describes progress as the instrument enters the commissioning part of the first phase.« less
Progress on PEEM3 - An Aberration Corrected X-Ray PhotoemissionElectron Microscope at the ALS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacDowell, Alastair A.; Feng, J.; DeMello, A.
2006-05-20
A new ultrahigh-resolution photoemission electron microscope called PEEM3 is being developed and built at the Advanced Light Source (ALS). An electron mirror combined with a much-simplified magnetic dipole separator is to be used to provide simultaneous correction of spherical and chromatic aberrations. It is installed on an elliptically polarized undulator (EPU) beamline, and will be operated with very high spatial resolution and high flux to study the composition, structure, electric and magnetic properties of complex materials. The instrument has been designed and is described. The instrumental hardware is being deployed in 2 phases. The first phase is the deployment ofmore » a standard PEEM type microscope consisting of the standard linear array of electrostatic electron lenses. The second phase will be the installation of the aberration corrected upgrade to improve resolution and throughput. This paper describes progress as the instrument enters the commissioning part of the first phase.« less
Solar heating system installed at Blakedale Professional Center, Greenwood, South Carolina
NASA Technical Reports Server (NTRS)
1980-01-01
Information on the solar heating system installed at the Blakedale Professional Center, in Greenwood, South Carolina is presented. The information consists of site and building description, solar system description, performance evaluation, system problems and installation drawings. The solar system was designed to provide approximately 85 percent of the building's heating requirements. The system was installed concurrently with building construction and heats 4,440 square feet of the building. There are 954 square feet of liquid flat plate collectors that are proof-mounted and have a drain-down system to protect the collectors from freezing. A 5,000 gallon steel, polyurethane insulated tank buried underground provides storage. The system was fully instrumented for performance evaluation and integrated into the National Solar Data Network.
GOES-R Advanced Base Line Imager Installation
2016-08-30
Team members assist as a crane lifts the Advanced Base Line Imager, the primary optical instrument, for installation on the Geostationary Operational Environmental Satellite (GOES-R) inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.
GOES-R Advanced Base Line Imager Installation
2016-08-30
Team members assist as a crane moves the Advanced Base Line Imager, the primary optical instruments, for installation on the Geostationary Operational Environmental Satellite (GOES-R) inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.
Problems associated with operations and measurement in cryogenic wind tunnels
NASA Technical Reports Server (NTRS)
Blanchard, A.; Delcourt, V.; Plazanet, M.
1986-01-01
Cryogenic wind tunnel T'3 under continuous blower operation has been the object of improvements and the installation of auxiliary equipment, dealing in particular with the enlargement of the liquid nitrogen injection reservoir and the hook-up to a fast data acquisition system. Following a brief description of the installation and its functioning, we present the main experimental techniques and the instrumentation used in the cryogenic environment.
ESPRESSO: projecting a rocky exoplanet hunter for the VLT
NASA Astrophysics Data System (ADS)
Mégevand, Denis; Herreros, José-Miguel; Zerbi, Filippo; Cabral, Alexandre; Di Marcantonio, Paolo; Lovis, Christophe; Pepe, Francesco; Cristiani, Stefano; Rebolo, Rafael; Santos, Nuno C.
2010-07-01
ESPRESSO is a high-resolution, highly stable spectrograph for the VLT. It will inherit and enhance most capabilities from HARPS and UVES, combining both stability and efficiency. The main science driver will be the detection and characterization of Earth-like planets, but many additional science cases will benefit from its highly stable spectroscopic observations. The facility will be installed at the combined Coudé focus of the VLT and may be linked with any of the four UT telescopes, enabling thus a great flexibility for the efficient use of telescope time. This particularity makes the interface with the VLT more complex than for an instrument fed by a single telescope. It impacts on the complexity of the relationship between the consortium providing the instrument and ESO, the customer. The targeted high RV accuracy requires very high performances in stability and resolution, which in turn require adequate technical solutions at several levels. This paper describes the instrument system and subsystems, enlightening the most valuable differences between ESPRESSO and it's predecessors, the details of the project, entering now the design phases, the ESPRESSO consortium, composed of Italian, Portuguese, Spanish and Swiss institutes, and the relationship between the consortium and ESO.
Characterization of space dust using acoustic impact detection.
Corsaro, Robert D; Giovane, Frank; Liou, Jer-Chyi; Burchell, Mark J; Cole, Michael J; Williams, Earl G; Lagakos, Nicholas; Sadilek, Albert; Anderson, Christopher R
2016-08-01
This paper describes studies leading to the development of an acoustic instrument for measuring properties of micrometeoroids and other dust particles in space. The instrument uses a pair of easily penetrated membranes separated by a known distance. Sensors located on these films detect the transient acoustic signals produced by particle impacts. The arrival times of these signals at the sensor locations are used in a simple multilateration calculation to measure the impact coordinates on each film. Particle direction and speed are found using these impact coordinates and the known membrane separations. This ability to determine particle speed, direction, and time of impact provides the information needed to assign the particle's orbit and identify its likely origin. In many cases additional particle properties can be estimated from the signal amplitudes, including approximate diameter and (for small particles) some indication of composition/morphology. Two versions of this instrument were evaluated in this study. Fiber optic displacement sensors are found advantageous when very thin membranes can be maintained in tension (solar sails, lunar surface). Piezoelectric strain sensors are preferred for thicker films without tension (long duration free flyers). The latter was selected for an upcoming installation on the International Space Station.
NASA Astrophysics Data System (ADS)
Ginsberg, Mark D.; Smith, Eddy D.; VanBlaricum, Vicki; Hock, Vincent F.; Kroll, Dan; Russell, Kevin J.
2010-04-01
Both real events and models have proven that drinking water systems are vulnerable to deliberate and/or accidental contamination. Additionally, homeland security initiatives and modeling efforts have determined that it is relatively easy to orchestrate the contamination of potable water supplies. Such contamination can be accomplished with classic and non-traditional chemical agents, toxic industrial chemicals (TICs), and/or toxic industrial materials (TIMs). Subsequent research and testing has developed a proven network for detection and response to these threats. The method uses offthe- shelf, broad-spectrum analytical instruments coupled with advanced interpretive algorithms. The system detects and characterizes any backflow events involving toxic contaminants by employing unique chemical signature (fingerprint) response data. This instrumentation has been certified by the Office of Homeland Security for detecting deliberate and/or accidental contamination of critical water infrastructure. The system involves integration of several mature technologies (sensors, SCADA, dynamic models, and the HACH HST Guardian Blue instrumentation) into a complete, real-time, management system that also can be used to address other water distribution concerns, such as corrosion. This paper summarizes the reasons and results for installing such a distribution-based detection and protection system.
Implementation of the control electronics for KMOS instrument
NASA Astrophysics Data System (ADS)
Hess, Hans-Joachim; Ilijevski, Ivica; Kravcar, Helmut; Richter, Josef; Rühfel, Josef; Schwab, Christoph
2010-07-01
The KMOS Instrument is built to be one of the second generation VLT instruments. It is a highly complex multi-object spectrograph for the near infrared. Nearly 60 cryogenic mechanisms have to be controlled. This includes 24 deployable Pick-Off arms, three filter and grating wheels as well as three focus stages and four lamps with an attenuator wheel. These mechanisms and a calibration unit are supervised by three control cabinets based on the VLT standards. To follow the rotation of the Nasmyth adaptor the cabinets are mounted into a Co-rotating structure. The presentation will highlight the requirements on the electronics control and how these are met by new technologies applying a compact and reliable signal distribution. To enable high density wiring within the given space envelope flex-rigid printed circuit board designs have been installed. In addition an electronic system that detects collisions between the moving Pick-Off arms will be presented for safe operations. The control system is designed to achieve two micron resolution as required by optomechanical and flexure constraints. Dedicated LVDT sensors are capable to identify the absolute positions of the Pick- Off arms. These contribute to a safe recovery procedure after power failure or accidental collision.
14 CFR 23.1305 - Powerplant instruments.
Code of Federal Regulations, 2014 CFR
2014-01-01
... with a controllable propeller. (6) For each turbocharger installation: (i) If limitations are established for either carburetor (or manifold) air inlet temperature or exhaust gas or turbocharger turbine...
14 CFR 23.1305 - Powerplant instruments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... with a controllable propeller. (6) For each turbocharger installation: (i) If limitations are established for either carburetor (or manifold) air inlet temperature or exhaust gas or turbocharger turbine...
14 CFR 23.1305 - Powerplant instruments.
Code of Federal Regulations, 2012 CFR
2012-01-01
... with a controllable propeller. (6) For each turbocharger installation: (i) If limitations are established for either carburetor (or manifold) air inlet temperature or exhaust gas or turbocharger turbine...
14 CFR 23.1305 - Powerplant instruments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... with a controllable propeller. (6) For each turbocharger installation: (i) If limitations are established for either carburetor (or manifold) air inlet temperature or exhaust gas or turbocharger turbine...
14 CFR 23.1305 - Powerplant instruments.
Code of Federal Regulations, 2013 CFR
2013-01-01
... with a controllable propeller. (6) For each turbocharger installation: (i) If limitations are established for either carburetor (or manifold) air inlet temperature or exhaust gas or turbocharger turbine...
Integrating Sensors into a Marine Drone for Bathymetric 3D Surveys in Shallow Waters.
Giordano, Francesco; Mattei, Gaia; Parente, Claudio; Peluso, Francesco; Santamaria, Raffaele
2015-12-29
This paper demonstrates that accurate data concerning bathymetry as well as environmental conditions in shallow waters can be acquired using sensors that are integrated into the same marine vehicle. An open prototype of an unmanned surface vessel (USV) named MicroVeGA is described. The focus is on the main instruments installed on-board: a differential Global Position System (GPS) system and single beam echo sounder; inertial platform for attitude control; ultrasound obstacle-detection system with temperature control system; emerged and submerged video acquisition system. The results of two cases study are presented, both concerning areas (Sorrento Marina Grande and Marechiaro Harbour, both in the Gulf of Naples) characterized by a coastal physiography that impedes the execution of a bathymetric survey with traditional boats. In addition, those areas are critical because of the presence of submerged archaeological remains that produce rapid changes in depth values. The experiments confirm that the integration of the sensors improves the instruments' performance and survey accuracy.
International Collaboration and Academic Exchange of the CHAIN Project in this Three Years (Period)
NASA Astrophysics Data System (ADS)
Ueno, Satoru; Shibata, Kazunari; Morita, Satoshi; Kimura, Goichi; Asai, Ayumi; Kitai, Reizaburo; Ichimoto, Kiyoshi; Nagata, Shin'ichi; Ishii, Takako; Nakatani, Yoshikazu; Masashi, Yamaguchi; et al.
2014-02-01
We will introduce contents of international collaboration and academic exchange of the CHAIN project in recent three years (ISWI period). After April of 2010, we have not obtained any enough budget for new instruments. Therefore, we have not been able to install new Flare Monitoring Telescopes (FMT) in new countries, such as Algeria. On the other hand, however, we have continued international academic exchange through scientific and educational collaboration with mainly Peru, such as data-analysis training, holding scientific workshops etc. Additionally, in this year, King Saudi University of Saudi Arabia and CRAAG of Algeria have planned to build a new FMT in their university by their own budget. Therefore, we have started some collaboration in the field of technical advices of instruments and scientific themes etc. Moreover, Pakistan Space and Upper Atmosphere Research Commission (SUPARCO) also offered us participation in the CHAIN-project. We would like to continue to consider the possibility of academic collaboration with such new positive developing nations, too.
Cross-Referencing GLM and ISS-LIS with Ground-Based Lightning Networks
NASA Astrophysics Data System (ADS)
Virts, K.; Blakeslee, R. J.; Goodman, S. J.; Koshak, W. J.
2017-12-01
The Geostationary Lightning Mapper (GLM), in geostationary orbit aboard GOES-16 since late 2016, and the Lightning Imaging Sensor (LIS), installed on the International Space Station in February 2017, provide observations of total lightning activity from space. ISS-LIS samples the global tropics and mid-latitudes, while GLM observes the full thunderstorm life-cycle over the Americas and surrounding oceans. The launch of these instruments provides an unprecedented opportunity to compare lightning observations across multiple space-based optical lightning sensors. In this study, months of observations from GLM and ISS-LIS are cross-referenced with each other and with lightning detected by the ground-based Earth Networks Global Lightning Network (ENGLN) and the Vaisala Global Lightning Dataset 360 (GLD360) throughout and beyond the GLM field-of-view. In addition to calibration/validation of the new satellite sensors, this study provides a statistical comparison of the characteristics of lightning observed by the satellite and ground-based instruments, with an emphasis on the lightning flashes uniquely identified by the satellites.
Instrument Package Manipulation Through the Generation and Use of an Attenuated-Fluent Gas Fold
NASA Technical Reports Server (NTRS)
Breen, Daniel P.
2012-01-01
This document discusses a technique that provides a means for suspending large, awkward loads, instrument packages, components, and machinery in a stable, controlled, and precise manner. In the baseplate of the test machine, a pattern of grooves and ports is installed that when pressurized generates an attenuated- fluent gas fold providing a low-cost, near-zero-coefficient-of-friction lubrication boundary layer that supports the object evenly, and in a predictable manner. Package movement control requires minimal force. Aids to repeatable travel and positional accuracy can be added via the addition of simple guide bars and stops to the floor or object being moved. This allows easily regulated three-axis motions. Loads of extreme weight and size can be moved and guided by a single person, or by automated means, using minimal force. Upon removal of the attenuated fluent gas fold, the object returns to a stable resting position without impact forces affecting the object.
The NEPTUNE Canada Seismograph Network
NASA Astrophysics Data System (ADS)
Rogers, G. C.; Meldrum, R.; Baldwin, R.; Rosenberger, A.; Mulder, T.
2009-12-01
NEPTUNE Canada is the world’s first large regional cable-linked, multi-disciplinary scientific seafloor observatory. In the fall of 2007 an 800 kilometer ring of powered fibre optic cable was laid on the seafloor over the northern part of the Juan de Fuca plate and connected to a shore facility near Port Alberni on Vancouver Island. Five nodes were attached to the cable in the early in the summer of 2009 paving the way for junction boxes and scientific instruments installed in the late summer and fall. The NEPTUNE Canada Seismograph Network will consist initially of four broadband and four short period seismic systems. In the summer of 2009, three broadband OBS packages were deployed forming a large triangle with apexes at ODP 1027 in mid plate and two sites on the continental slope, ODP 889 and Barkley Canyon. In summer 2010 an additional broadband package will be installed on the Endeavour segment of the Juan de Fuca Ridge, and four short period instruments will be installed nearby forming a small array, 6 km in maximum dimension, to record earthquake activity in the vicinity of the many multidisciplinary ridge experiments. The broadband systems comprise a broadband seismometer and strong motion accelerometer in a surficially buried spherical titanium case, with a current meter, hydrophone and differential pressure gauge deployed nearby. The short period systems will include 3-component corehole seismometers on long term loan from the Monterey Bay Aquarium Research Institute (MBARI). All systems will have backup capacity for modest cable outages. The NEPTUNE Canada Seismograph Network relies heavily on knowledge gained from the previous seismographs temporarily deployed in the region by MBARI and the University of Washington and will re-occupy the broadband site and three short period sites at the ridge. NEPTUNE Canada seismic data will be archived by, and available from, both the Geological Survey of Canada and IRIS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geiger, David K
2015-12-31
An Agilent 400-MR nuclear magnetic resonance (NMR) spectrometer and ancillary equipment were purchased, which are being used for molecular structure elucidation. The instrumentation is housed in a pre-existing facility designed specifically for its use. This instrument package is being used to expand the research and educational efforts of the faculty and students at SUNY-Geneseo and is made available to neighboring educational institutions and business concerns. Funds were also used for training of College personnel, maintenance of the instrumentation, and installation of the equipment.
Department of Defense In-House RDT and E Activities
1976-10-30
BALLISTIC TESTS.FAC AVAL FCR TESIS OF SP ELELTRONIC’ FIl’ CON EQUIP 4 RELATED SYSTEMS E COMPONFNTZ, 35 INSTALLATION: MEDICAL BIOENGINEERINC- R&D LABORATORY...ANALYSIS OF CHEMICAL AND METALLOGRAPHIC EFFECTS, MICROBIOLOGICAL EFFECTS, CLIMATIC ENVIRONMENTAL EFFECTS. TEST AND EVALUATE WARHEADS AND SPECIAL...CCMMUNICATI’N SYST:M INSTRUMENTED DROP ZONES ENGINEERING TEST FACILITY INSTRUMENTATION CALIBRATICN FACILITY SCIENTIFIC COMPUTER CENTER ENVIRONMENTAL TESY
NASA Technical Reports Server (NTRS)
Hinkley, E. D., Jr.
1981-01-01
Instrument uses infrared absorption to determine methane concentration in liquid natural gas vapor. Two sensors measure intensity of 3.39 mm laser beam after it passes through gas; absorption is proportional to concentration of methane. Instrument is used in modeling spread of LNG clouds and as leak detector on LNG carriers and installations. Unit includes wheels for mobility and is both vertically and horizontally operable.
Boundary Layer Transition Flight Experiment Overview and In-Situ Measurements
NASA Technical Reports Server (NTRS)
Anderson, Brian P.; Campbell, Charles H.; Saucedo, Luis A.; Kinder, Gerald R.; Berger, Karen T.
2010-01-01
In support of the Boundary Layer Transition Flight Experiment (BLTFE) Project, a manufactured protuberance tile was installed on the port wing of Space Shuttle Orbiter Discovery for the flights of STS-119 and STS-128. Additional instrumentation was also installed in order to obtain more spatially resolved measurements downstream of the protuberance. This paper provides an overview of the BLTFE Project, including the project history, organizations involved, and motivations for the flight experiment. Significant efforts were made to place the protuberance at an appropriate location on the Orbiter and to design the protuberance to withstand the expected environments. Efforts were also extended to understand the as-fabricated shape of the protuberance and the thermal protection system tile configuration surrounding the protuberance. A high-level overview of the in-situ flight data is presented, along with a summary of the comparisons between pre- and post-flight analysis predictions and flight data. Comparisons show that predictions for boundary layer transition onset time closely match the flight data, while predicted temperatures were significantly higher than observed flight temperatures.
Fiscal Year (FY) 2017 Activities for the Spent Fuel Nondestructive Assay Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trellue, Holly Renee; Trahan, Alexis Chanel; McMath, Garrett Earl
The main focus of research in the NA-241 spent fuel nondestructive assay (NDA) project in FY17 has been completing the fabrication and testing of two prototype instruments for upcoming spent fuel measurements at the Clab interim storage facility in Sweden. One is a passive instrument: Differential Die-away Self Interrogation-Passive Neutron Albedo Reactivity (DDSI), and one is an active instrument: Differential Die-Away-Californium Interrogation with Prompt Neutron (DDA). DDSI was fabricated and tested with fresh fuel at Los Alamos National Laboratory in FY15 and FY16, then shipped to Sweden at the beginning of FY17. Research was performed in FY17 to simplify resultsmore » from the data acquisition system, which is complex because signals from 56 different 3He detectors must be processed using list mode data. The DDA instrument was fabricated at the end of FY16. New high count rate electronics better suited for a spent fuel environment (i.e., KM-200 preamplifiers) were built specifically for this instrument in FY17, and new Tygon tubing to house electrical cables was purchased and installed. Fresh fuel tests using the DDA instrument with numerous configurations of fuel rods containing depleted uranium (DU), low enriched uranium (LEU), and LEU with burnable poisons (Gd) were successfully performed and compared to simulations.1 Additionally, members of the spent fuel NDA project team travelled to Sweden for a “spent fuel characterization and decay heat” workshop involving simulations of spent fuel and analysis of uncertainties in decay heat calculations.« less
NASA Technical Reports Server (NTRS)
Hersey, Mayo D
1923-01-01
This report is intended as a technical introduction to the series of reports on aeronautic instruments. It presents a discussion of those subjects which are common to all instruments. First, a general classification is given, embracing all types of instruments used in aeronautics. Finally, a classification is given of the various problems confronted by the instrument expert and investigator. In this way the following groups of problems are brought up for consideration: problems of mechanical design, human factor, manufacturing problems, supply and selection of instruments, problems concerning the technique of testing, problems of installation, problems concerning the use of instruments, problems of maintenance, and physical research problems. This enumeration of problems which are common to instruments in general serves to indicate the different points of view which should be kept in mind in approaching the study of any particular instrument.
Two-way multi-band optical/IR transmission measurements in the Persian Gulf coastal region
NASA Astrophysics Data System (ADS)
de Jong, Arie N.; Fritz, Peter J.
2005-10-01
The atmospheric conditions in the Persian Gulf region are significantly different from other places in the world. The particle size distribution may vary daily and during the day. The aerosols can contribute to the amount of rainfall over land, important for the nations around the Gulf. In 2004 NASNGSFC and NRL (Naval Research Laboratory) introduced a proposal to improve the modelling of aerosol transport for the Persian Gulf area. The proposal included a measurement campaign in the UAE (United Arabian Emirates), held in the summer/fall of 2004, sponsored by the DWRS (Department of Water Resources Studies) in Abu Dhabi: UAEz (Unified Aerosol Experiment in the UAE). In this campaign NASA installed a number of multi-spectral sun-photometers at various locations in the UAE (http://aeronet.gsfc.nasa.gov). NRL installed ground based and airborne particle samplers. In addition, TNO (the Netherlands) installed its multi-band opticaUIR transmissometer, in order to collect horizontal, path-integrated transmission data. This device provides additional information on the scattering behaviour of the aerosols compared to the other instruments, which either integrate scattering over the full vertical path (the NASA sun-photometers, providing the Aerosol Optical Depth (AOD)) or sample the particles in-situ (the NRL particle samplers, providing size distribution and composition). This paper deals with our transmission measurement set-up, which was located in a coastal area near Abu Dhabi. This location allowed the investigation of the local variability of the atmospheric conditions: from desert dust to pollution, such as fossil fuel and biomass burning, depending on the wind direction. For logistic reasons a set-up was chosen with a retro-reflector. This choice implies consequences for the calibration procedure and measurement accuracy, which are discussed in detail. Also the effects of path-inhomogeneity and scintillation for such a two-way set-up are considered. Results are presented for the measurement period of two weeks in September, showing interesting transmission effects due to temporal changes in aerosol particle composition. These phenomena cannot be explained by scattering theory for spherical particles. More knowledge is required on the shape and composition of the particles. Comparison of the transmission data with the data from other instruments will be done in a next phase.
2001-07-28
Photographic documentation of the High Power Engine Propulsion HiPEP after a duration test. Also photographed are the instrumentation and installation articles to reveal post test conditions such as corrosion and pitting.
2001-07-28
Photographic documentation of the High Power Engine Propulsion HiPEP after a duration test. Also photographed are the instrumentation and installation articles to reveal post test conditions such as corrosion and pitting.
2001-07-28
Photographic documentation of the High Power Engine Propulsion HiPEP after a duration test. Also photographed are the instrumentation and installation articles to reveal post test conditions such as corrosion and pitting.
14 CFR 23.1321 - Arrangement and visibility.
Code of Federal Regulations, 2010 CFR
2010-01-01
...: Installation § 23.1321 Arrangement and visibility. (a) Each flight, navigation, and powerplant instrument for... most effectively indicates direction of flight, other than the magnetic direction indicator required by...
14 CFR 23.1321 - Arrangement and visibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
...: Installation § 23.1321 Arrangement and visibility. (a) Each flight, navigation, and powerplant instrument for... most effectively indicates direction of flight, other than the magnetic direction indicator required by...
14 CFR 23.1321 - Arrangement and visibility.
Code of Federal Regulations, 2011 CFR
2011-01-01
...: Installation § 23.1321 Arrangement and visibility. (a) Each flight, navigation, and powerplant instrument for... most effectively indicates direction of flight, other than the magnetic direction indicator required by...
Comprehensive helicopter rotor instrumentation - A retrofit approach using miniature transducers
NASA Technical Reports Server (NTRS)
Jacklin, Stephen A.; Mort, Ray; Morrison, Dwayne
1992-01-01
This paper reports an approach used to retrofit a set of full-scale main rotor blades with 290 miniature pressure transducers, 46 strain gages, and 24 miniature accelerometers. Normally, in order to avoid disturbing the aerodynamics of the rotor flow field, the pressure instrumentation must be integrally built into the body of the rotor blades. However, using a method developed with NASA, miniature pressure transducers are mounted to the blade exterior surface without degrading the quality of the blade aerodynamics. Moreover, it is estimated that this approach reduced costs by more than 50 percent over building a set of pressure instrumented blades. The aerodynamic measurement objectives are presented as are instrumentation design considerations, type of instrumentation used, assembly process, and the installed instrumentation characteristics.
NASA Astrophysics Data System (ADS)
Prochaska, T.; Allen, R.; Mondrik, N.; Rheault, J. P.; Sauseda, M.; Boster, E.; James, M.; Rodriguez-Patino, M.; Torres, G.; Ham, J.; Cook, E.; Baker, D.; DePoy, Darren L.; Marshall, Jennifer L.; Hill, G. J.; Perry, D.; Savage, R. D.; Good, J. M.; Vattiat, Brian L.
2014-08-01
The Visible Integral-Field Replicable Unit Spectrograph (VIRUS) instrument will be installed at the Hobby-Eberly Telescope† in the near future. The instrument will be housed in two enclosures that are mounted adjacent to the telescope, via the VIRUS Support Structure (VSS). We have designed the enclosures to support and protect the instrument, to enable servicing of the instrument, and to cool the instrument appropriately while not adversely affecting the dome environment. The system uses simple HVAC air handling techniques in conjunction with thermoelectric and standard glycol heat exchangers to provide efficient heat removal. The enclosures also provide power and data transfer to and from each VIRUS unit, liquid nitrogen cooling to the detectors, and environmental monitoring of the instrument and dome environments. In this paper, we describe the design and fabrication of the VIRUS enclosures and their subsystems.
Translations on Environmental Quality, Number 148
1977-10-03
Article 9. Designs for gas filtering installations must include the proper control and automation facilities as per articles 16 and 17. Article 10...mandatorily equipped with: 1. Locking armature at the gas entrance and exit with manual or remote control flanges for the installation of end-caps in...instruments shall be mounted on the control panel of the gas filtering system or the control panel for the technological process. Article 17. (1) The gas
Space Shuttle Orbiter SILTS Pod Flow Angularity and Aerodynamic Heating Tests (OH-102A and OH-400).
1979-11-01
fabricated from 17 - 4PH stainless steel and instrumented with tnermocouples. A photograph or the 9L-p model with the U.UJZJ scale vertical tail installed is...DISTRIBUTION STATE=MENT (of this ’Report) Approved for public release; distribution unlimited. 17 . DISTRIBUTION STATEMENT (of the abstract entered In...Model Installation ....... .................. . 17 3. Vertical Tail for Flow Angularity ..... .............. ... 18 4. Photograph of 56-) Model
Engineering aspects of the Large Binocular Telescope Observatory adaptive optics systems
NASA Astrophysics Data System (ADS)
Brusa, Guido; Ashby, Dave; Christou, Julian C.; Kern, Jonathan; Lefebvre, Michael; McMahon, Tom J.; Miller, Douglas; Rahmer, Gustavo; Sosa, Richard; Taylor, Gregory; Vogel, Conrad; Zhang, Xianyu
2016-07-01
Vertical profiles of the atmospheric optical turbulence strength and velocity is of critical importance for simulating, designing, and operating the next generation of instruments for the European Extremely Large Telescope. Many of these instruments are already well into the design phase meaning these profies are required immediately to ensure they are optimised for the unique conditions likely to be observed. Stereo-SCIDAR is a generalised SCIDAR instrument which is used to characterise the profile of the atmospheric optical turbulence strength and wind velocity using triangulation between two optical binary stars. Stereo-SCIDAR has demonstrated the capability to resolve turbulent layers with the required vertical resolution to support wide-field ELT instrument designs. These high resolution atmospheric parameters are critical for design studies and statistical evaluation of on-sky performance under real conditions. Here we report on the new Stereo-SCIDAR instrument installed on one of the Auxillary Telescope ports of the Very Large Telescope array at Cerro Paranal. Paranal is located approximately 20 km from Cerro Armazones, the site of the E-ELT. Although the surface layer of the turbulence will be different for the two sites due to local geography, the high-altitude resolution profiles of the free atmosphere from this instrument will be the most accurate available for the E-ELT site. In addition, these unbiased and independent profiles are also used to further characterise the site of the VLT. This enables instrument performance calibration, optimisation and data analysis of, for example, the ESO Adaptive Optics facility and the Next Generation Transit Survey. It will also be used to validate atmospheric models for turbulence forecasting. We show early results from the commissioning and address future implications of the results.
Borehole dilatometer installation, operation, and maintenance at sites in Hawaii
Myren, G.D.; Johnston, M.J.S.; Mueller, R.J.
2006-01-01
In response to concerns about the potential hazard of Mauna Loa volcano in Hawaii, the USGS began efforts in 1998 to add four high-resolution borehole sites. Located at these sites are; strainmeters, tiltmeters, seismometers, accelerometers and other instrumentation. These instruments are capable of providing continuous monitoring of the magma movement under Mauna Loa. Each site was planned to provide multi-parameter monitoring of volcanic activity. In June of 2000, a contract was let for the core drilling of three of these four sites. They are located at Hokukano (west side of Mauna Loa) above Captain Cook, Hawaii; at Mauna Loa Observatory (11,737 feet near the summit), and at Mauna Loa Strip Road (east side of Mauna Loa). Another site was chosen near Halema'uma u' and Kilauea's summit, in the Keller deep well. (See maps). The locations of these instruments are shown in Figure 1 with their latitude and longitude in Table 1. The purpose of this network is to monitor crustal deformation associated with volcanic intrusions and earthquakes on Mauna Loa and Kilauea volcanoes. This report describes the methods used to locate sites, install dilatometers, other instrumentation, and telemetry. We also provide a detailed description of the electronics used for signal amplification and telemetry, plus techniques used for instrument maintenance. Instrument sites were selected in regions of hard volcanic rock where the expected signals from magmatic activity were calculated to be a maximum and the probability of earthquakes with magnitude 4 or greater is large. At each location, an attempt was made to separate tectonic and volcanic signals from known noise sources for each instrument type.
The 1997 HST Calibration Workshop with a New Generation of Instruments
NASA Technical Reports Server (NTRS)
Casertano, S. (Editor); Jedrzejewski, R. (Editor); Keyes, T. (Editor); Stevens, M. (Editor)
1997-01-01
The Second Servicing mission in early 1997 has brought major changes to the Hubble Space Telescope (HST). Two of the original instruments, Faint Object Spectrograph (FOS) and Goddard High Resolution Spectrograph (GHRS), were taken out, and replaced by completely new instruments, the Space Telescope Imaging Spectrograph (STIS) and the Near Infrared Camera Multi-Object Spectrograph (NICMOS). Two new types of detectors were installed, and for the first time, HST gained infrared capabilities. A new Fine Guidance Sensor (FGS) was installed, with an alignment mechanism that could improve substantially both guiding and astrometric capabilities. With all these changes come new challenges. The characterization of the new instruments has required a major effort, both by their respective Investigation Definition Teams and at the Space Telescope Science Institute. All necessary final calibrations for the retired spectrographs needed to be carried out, and their properties definitively characterized. At the same time, work has continued to improve our understanding of the instruments that have remained on board. The results of these activities were discussed in the 1997 HST (Hubble Space Telescope) Calibration Workshop. The main focus of the Workshop was to provide users with the tools and the understanding they need to use HST's instruments and archival data to the best of their possibilities. This book contains the written record of the Workshop. As such, it should provide a valuable tool to all interested in using existing HST data or in proposing for new observations.
NASA Astrophysics Data System (ADS)
Basara, J. B.; Otkin, J.; Mahan, H. R.; Anderson, M. C.; Hain, C.; Wagle, P.; Xiao, X.
2014-12-01
The Marena Oklahoma In Situ Sensor Testbed (MOISST) site was installed in May 2010 as part of the calibration and validation program for the NASA Soil Moisture Active Passive (SMAP) mission. The site includes more than 200 soil, vegetation, and atmospheric sensors installed over an approximately 64 hectare pasture in Central Oklahoma with 4 main stations and multiple sensors installed in profiles. Additional sensors located at the site include a COsmic-ray Soil Moisture Observing System, global position system reflectometers, a passive distributed temperature system, an eddy correlation flux tower, and a phenocam. During 2012, flash drought conditions occurred at the MOISST location as conditions transitioned from no drought in late April to D4 (exceptional drought) in mid August. The array of instruments captured the dramatic transition of land-surface conditions at the MOISST site, in particular during a period spanning approximately six weeks in July and August in whereby drought conditions changed from abnormally dry to exceptional drought and ecosystem collapsed occurred. Results for the analyses demonstrated that both soil moisture and vegetation dynamics were critical components to flash drought development. Further, when the Evaporative Stress Index (ESI) was applied to the MOISST site during 2012, the results demonstrated that the predictability of drought conditions were increased to nearly six weeks prior to flash drought development that began in July.
Key Science Instrument Installed into Webb Structure
2017-12-08
Engineers are checking to make sure that MIRI is precisely positioned with the ISIM as it slides into position. They have to make sure it's installed exactly where it needs to be within the width of a thin human hair. Visible is MIRI's pickoff mirror, which is the protrusion on the right side of the instrument that looks like a periscope on its side. This is where MIRI grabs light coming from the telescope optics. Also visible is the silver-colored base of MIRI's cryocooled shield, already installed on the ISIM structure and with a hole in it for MIRI's pickoff mirror. MIRI itself has special silver-colored blanketing around it as insulation to keep it at its proper cryogenic temperature during operation. Photo Credit: NASA/Chris Gunn; Text Credit: NASA/Laura Betz ---- Engineers worked meticulously to implant the James Webb Space Telescope's Mid-Infrared Instrument into the ISIM, or Integrated Science Instrument Module, in the cleanroom at NASA's Goddard Space Flight Center in Greenbelt, Md. As the successor to NASA's Hubble Space Telescope, the Webb telescope will be the most powerful space telescope ever built. It will observe the most distant objects in the universe, provide images of the first galaxies formed and see unexplored planets around distant stars. For more information, visit: www.jwst.nasa.gov NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
2017-12-08
On Jan. 22, 2015, robotic flight controllers successfully installed NASA’s Cloud Aerosol Transport System (CATS) onboard the International Space Station. CATS will collect data about clouds, volcanic ash plumes and tiny airborne particles that can help improve our understanding of aerosol and cloud interactions, and improve the accuracy of climate change models. CATS had been mounted inside the SpaceX Dragon cargo craft’s unpressurized trunk since it docked at the station on Jan. 12. Ground controllers at NASA’s Johnson Space Center in Houston, Texas, used one of the space station’s robotic arms, called the Special Purpose Dexterous Manipulator, to extract the instrument from the capsule. The NASA-controlled arm passed the instrument to a second robotic arm— like passing a baton in a relay race. This second arm, called the Japanese Experiment Module Remote Manipulator System, is controlled by the Japanese Aerospace Exploration Agency. The Japanese-controlled arm installed the instrument to the Space Station’s Japanese Experiment Module, making CATS the first NASA-developed payload to fly on the Japanese module. CATS is a lidar remote-sensing instrument designed to last from six months to three years. It is specifically intended to demonstrate a low-cost, streamlined approach to developing science payloads on the space station. CATS launched aboard the SpaceX Dragon spacecraft on Jan. 10 at Cape Canaveral Air Force Station in Florida. To learn more about the impact of CATS data, visit: www.nasa.gov/cats/ NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
Performance of the EBIT calorimeter spectrometer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porter, Frederick Scott; Gygax, John; Kelley, Richard L.
The EBIT calorimeter spectrometer (ECS) is a new high-resolution, broadband x-ray spectrometer that has recently been installed at the Electron Beam Ion Trap Facility (EBIT) at the Lawrence Livermore National Laboratory. The ECS is an entirely new production class spectrometer that replaces the XRS/EBIT spectrometer that has been operating at EBIT since 2000. The ECS utilizes a 32-pixel x-ray calorimeter array from the XRS instrument on the Suzaku x-ray observatory. Eighteen of the pixels are optimized for the 0.1-10 keV band and yield 4.5 eV full width at half maximum energy resolution and 95% quantum efficiency at 6 keV. Inmore » addition, the ECS includes 14 detector pixels that are optimized for the high-energy band with a bandpass from 0.5 to over 100 keV with 34 eV resolution and 32% quantum efficiency at 60 keV. The ECS detector array is operated at 50 mK using a five stage cryogenic system that is entirely automated. The instrument takes data continuously for over 65 h with a 2.5 h recycle time. The ECS is a nondispersive, broadband, highly efficient spectrometer that is one of the prime instruments at the EBIT facility. The instrument is used for studies of absolute cross sections, charge exchange recombination, and x-ray emission from nonequilibrium plasmas, among other measurements in our laboratory astrophysics program.« less
Preliminary results from comparisons of redundant tiltmeters at three sites in central california
Mortensen, C.E.; Johnston, M.J.S.
1979-01-01
The U.S. Geological Survey has been operating a network of shallow-borehole tiltmeters in central California since June 1973. At six sites redundant instruments have been installed as a check on data coherency. These include the Sage Ranch, Tres Pinos, New Idria, Aromas, Bear Valley and San Juan Bautista tiltmeter sites. Preliminary results from the comparison of redundant data from the Aromas, Bear Valley and San Juan Bautista sites for periods of eight, three and seven months respectively, suggest that short period tilt signals in the range 5 min < T < 3-5 h and ranging in amplitude from 5 ?? 10-8 to 10-6 rad, but not including step offsets, show excellent agreement on closely spaced instruments. Agreement is not as good in this period range for instruments at San Juan Bautista with a separation of 200 m. Signals of interest observed in this period range include coseismic tilts, teleseisms and tilts associated with creep events. Tilt signals in the period range 3-5 h < T < 2- 5 weeks are not always coherent at all three of the redundant tilt sites studied. Tilt signals in this period range have amplitudes up to 5 ?? 10-6 rad and wavelengths down to at least the instrument separation at the closely spaced sites (~several meters). Regarding longerterm coherency, the instruments at San Juan Bautista with 200-m spacing, agree within 0.5 ??rad for the N-S component and 0.7 jurad for the E-W component for a period of two months. The closely spaced redundant instruments at Aromas agree within 2 ??rad for the N-S component and 1 ??rad for the E-W component for the eight-month period of operation. Data from the three sites have been checked for effects of temperature, atmospheric pressure and rainfall. The latter appears to be critically site dependent. The worst case tilts for 1 inch of rainfall can be more than 1 jurad with a duration of a few days to a week. Typical rain-induced tilts are less than 0.3 ??rad for 1 inch of rain. The two instruments at the Sage Ranch site have been in operation for the longest period. However, they have shown local site or ground instability, high drift and lack of coherency since installation. Data are not yet available from the Tres Pinos or New Idria instruments. Deeper installation appears necessary for these instruments and two alternative methods of tiltmeter emplacement are currently being tested in an attempt to evaluate the depth, spatial and temporal dependency of surface tilt sources. ?? 1979.
1972-02-01
The Apollo Telescope Mount (ATM) was designed and developed by the Marshall Space Flight Center and served as the primary scientific instrument unit aboard Skylab (1973-1979). The ATM consisted of eight scientific instruments as well as a number of smaller experiments. In this image, the set of four large solar cell arrays, which could produce up to as much as 1.1 kilowatts of electric power, are being installed on an ATM prototype.
Controlled Impact Demonstration instrumented test dummies installed in plane
NASA Technical Reports Server (NTRS)
1984-01-01
In this photograph are seen some of dummies in the passenger cabin of the B-720 aircraft. NASA Langley Research Center instrumented a large portion of the aircraft and the dummies for loads in a crashworthiness research program. In 1984 NASA Dryden Flight Research Facility and the Federal Aviation Adimistration (FAA) teamed-up in a unique flight experiment called the Controlled Impact Demonstration (CID). The test involved crashing a Boeing 720 aircraft with four JT3C-7 engines burning a mixture of standard fuel with an additive called Anti-misting Kerosene (AMK) designed to supress fire. In a typical aircraft crash, fuel spilled from ruptured fuel tanks forms a fine mist that can be ignited by a number of sources at the crash site. In 1984 the NASA Dryden Flight Research Facility (after 1994 a full-fledged Center again) and the Federal Aviation Administration (FAA) teamed-up in a unique flight experiment called the Controlled Impact Demonstration (CID), to test crash a Boeing 720 aircraft using standard fuel with an additive designed to supress fire. The additive, FM-9, a high-molecular-weight long-chain polymer, when blended with Jet-A fuel had demonstrated the capability to inhibit ignition and flame propagation of the released fuel in simulated crash tests. This anti-misting kerosene (AMK) cannot be introduced directly into a gas turbine engine due to several possible problems such as clogging of filters. The AMK must be restored to almost Jet-A before being introduced into the engine for burning. This restoration is called 'degradation' and was accomplished on the B-720 using a device called a 'degrader.' Each of the four Pratt & Whitney JT3C-7 engines had a 'degrader' built and installed by General Electric (GE) to break down and return the AMK to near Jet-A quality. In addition to the AMK research the NASA Langley Research Center was involved in a structural loads measurement experiment, which included having instrumented dummies filling the seats in the passenger compartment. Before the final flight on December 1, 1984, more than four years of effort passed trying to set-up final impact conditions considered survivable by the FAA. During those years while 14 flights with crews were flown the following major efforts were underway: NASA Dryden developed the remote piloting techniques necessary for the B-720 to fly as a drone aircraft; General Electric installed and tested four degraders (one on each engine); and the FAA refined AMK (blending, testing, and fueling a full-size aircraft). The 15 flights had 15 takeoffs, 14 landings and a larger number of approaches to about 150 feet above the prepared crash site under remote control. These flight were used to introduce AMK one step at a time into some of the fuel tanks and engines while monitoring the performance of the engines. On the final flight (No. 15) with no crew, all fuel tanks were filled with a total of 76,000 pounds of AMK and the remotely-piloted aircraft landed on Rogers Dry Lakebed in an area prepared with posts to test the effectiveness of the AMK in a controlled impact. The CID, which some wags called the Crash in the Desert, was spectacular with a large fireball enveloping and burning the B-720 aircraft. From the standpoint of AMK the test was a major set-back, but for NASA Langley, the data collected on crashworthiness was deemed successful and just as important.
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Demler
2006-04-01
Accurate, cost-efficient monitoring instrumentation has long been considered essential to the operation of power plants. Nonetheless, for the monitoring of coal flow, such instrumentation has been sorely lacking and technically difficult to achieve. With more than half of the electrical power in the United States currently supplied by coal, energy generated by this resource is critical to the US economy. The demand for improvement in this area has only increased as a result of the following two situations: First, deregulation has produced a heightened demand for both reduced electrical cost and improved grid connectivity. Second, environmental concerns have simultaneously resultedmore » in a need for both increased efficiency and reduced carbon and NOx emissions. A potential approach to addressing both these needs would be improvement in the area of combustion control. This would result in a better heat rate, reduced unburned carbon in ash, and reduced NOx emissions. However, before feedback control can be implemented, the ability to monitor coal flow to the burners in real-time must be established. While there are several ''commercially available'' products for real-time coal flow measurement, power plant personnel are highly skeptical about the accuracy and longevity of these systems in their current state of development. In fact, following several demonstration projects of in-situ coal flow measurement systems in full scale utility boilers, it became obvious that there were still many unknown influences on these instruments during field applications. Due to the operational environment of the power plant, it has been difficult if not impossible to sort out what parameters could be influencing the various probe technologies. Additionally, it has been recognized for some time that little is known regarding the performance of coal flow splitters, even where rifflers are employed. Often the coal flow distribution from these splitters remains mal-distributed. There have been mixed results in the field using variable orifices in coal pipes. Development of other coal flow control devices has been limited. An underlying difficulty that, to date, has hindered the development of an accurate instrument for coal flow measurements is the fact that coal flow is characterized by irregular temporal and spatial variation. However, despite the inherent complexity of the dynamic system, the system is in fact deterministic. Therefore, in principle, the coal flow can be deduced from the dynamics it exhibits. Nonetheless, the interactions are highly nonlinear, rendering standard signal processing approaches, which rely on techniques such as frequency decomposition, to be of little value. Foster-Miller, Inc. has developed a methodology that relates the complex variation in such systems to the information of interest. This technology will be described in detail in Section 2. A second concern regarding the current measurement systems is installation, which can be labor-intensive and cost-prohibitive. A process that does not require the pulverizer to be taken off line would be highly desirable. Most microwave and electrostatic methods require drilling up to 20 holes in the pipe, all with a high degree of precision so as to produce a proper alignment of the probes. At least one electrostatic method requires a special spool piece to be fitted into each existing coal pipe. Overall, these procedures are both difficult and very expensive. An alternative approach is pursued here, namely the development of an instrument that relies on an acoustic signal captured by way of a commercial accelerometer. The installation of this type of sensor is both simpler and less invasive than other techniques. An accelerometer installed in a pipe wall need not penetrate through the wall, which means that the system may be able to remain on line during the installation. Further, due to the fact that the Dynamical Instruments technology, unlike other systems, does not rely on uniformity of the air or coal profile, the installation location need not be on a long, straight run of pipe. In fact, an optimal signal is obtained near a pipe elbow. This is fortuitous, as bends are often more accessible on pipes in a power plant than straight sections. In contrast to measurement systems that rely on the uniformity of the air and coal profile, the accuracy of the system under development will not compromised by varying levels of flow uniformity.« less
14 CFR 121.420 - Flight navigators: Initial and transition ground training.
Code of Federal Regulations, 2014 CFR
2014-01-01
... indicating instruments or systems. (5) Compass limitations and methods of compensation. (6) Cruise control..., cruise, and descent speeds. (2) Each item of navigational equipment installed including appropriate radio...
Composite Social Network for Predicting Mobile Apps Installation
2011-06-02
analysis used by social scientists such as matched sample estimation (Aral, Muchnik, and Sundararajan 2009) are only for identifying network effects and...ar X iv :1 10 6. 03 59 v1 [ cs .S I] 2 J un 2 01 1 Composite Social Network for Predicting Mobile Apps Installation Wei Pan and Nadav Aharony...and Alex (Sandy) Pentland MIT Media Laboratory 20 Ames Street Cambridge, Massachusetts 02139 Abstract We have carefully instrumented a large portion of
MSFC Skylab instrumentation and communication system mission evaluation
NASA Technical Reports Server (NTRS)
Adair, B. M.
1974-01-01
An evaluation of the in-orbit performance of the instrumentation and communications systems installed on Skylab is presented. Performance is compared with functional requirements and the fidelity of communications. In-orbit performance includes processing engineering, scientific, experiment, and biomedical data, implementing ground-generated commands, audio and video communication, generating rendezvous ranging information, and radio frequency transmission and reception. A history of the system evolution based on the functional requirements and a physical description of the launch configuration is included. The report affirms that the instrumentation and communication system satisfied all imposed requirements.
NASA Astrophysics Data System (ADS)
Schwartz, Richard A.; Zarro, D.; Csillaghy, A.; Dennis, B.; Tolbert, A. K.; Etesi, L.
2009-05-01
We report on our activities to integrate VSO search and retrieval capabilities into standard data access, display, and analysis tools. In addition to its standard Web-based search form, the VSO provides an Interactive Data Language (IDL) client (vso_search) that is available through the Solar Software (SSW) package. We have incorporated this client into an IDL-widget interface program (show_synop) that allows for more simplified searching and downloading of VSO datasets directly into a user's IDL data analysis environment. In particular, we have provided the capability to read VSO datasets into a general purpose IDL package (plotman) that can display different datatypes (lightcurves, images, and spectra) and perform basic data operations such as zooming, image overlays, solar rotation, etc. Currently, the show_synop tool supports access to ground-based and space-based (SOHO, STEREO, and Hinode) observations, and has the capability to include new datasets as they become available. A user encounters two major hurdles when using the VSO: (1) Instrument-specific software (such as level-0 file readers and data-prepping procedures) may not be available in the user's local SSW distribution. (2) Recent calibration files (such as flat-fields) are not automatically distributed with the analysis software. To address these issues, we have developed a dedicated server (prepserver) that incorporates all the latest instrument-specific software libraries and calibration files. The prepserver uses an IDL-Java bridge to read and implement data processing requests from a client and return a processed data file that can be readily displayed with the show_synop/plotman package. The advantage of the prepserver is that the user is only required to install the general branch (gen) of the SSW tree, and is freed from the more onerous task of installing instrument-specific libraries and calibration files. We will demonstrate how the prepserver can be used to read, process, and overlay SOHO/EIT, TRACE, SECCHI/EUVI, and RHESSI images.
The OCO-3 Mission: Science Objectives and Instrument Performance
NASA Astrophysics Data System (ADS)
Eldering, A.; Basilio, R. R.; Bennett, M. W.
2017-12-01
The Orbiting Carbon Observatory 3 (OCO-3) will continue global CO2 and solar-induced chlorophyll fluorescence (SIF) using the flight spare instrument from OCO-2. The instrument is currently being tested, and will be packaged for installation on the International Space Station (ISS) (launch readiness in early 2018.) This talk will focus on the science objectives, updated simulations of the science data products, and the outcome of recent instrument performance tests. The low-inclination ISS orbit lets OCO-3 sample the tropics and sub-tropics across the full range of daylight hours with dense observations at northern and southern mid-latitudes (+/- 52º). The combination of these dense CO2 and SIF measurements provides continuity of data for global flux estimates as well as a unique opportunity to address key deficiencies in our understanding of the global carbon cycle. The instrument utilizes an agile, 2-axis pointing mechanism (PMA), providing the capability to look towards the bright reflection from the ocean and validation targets. The PMA also allows for a snapshot mapping mode to collect dense datasets over 100km by 100km areas. Measurements over urban centers could aid in making estimates of fossil fuel CO2 emissions. Similarly, the snapshot mapping mode can be used to sample regions of interest for the terrestrial carbon cycle. In addition, there is potential to utilize data from ISS instruments ECOSTRESS (ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station) and GEDI (Global Ecosystem Dynamics Investigation), which measure other key variables of the control of carbon uptake by plants, to complement OCO-3 data in science analysis. In 2017, the OCO-2 instrument was transformed into the ISS-ready OCO-3 payload. The transformed instrument was thoroughly tested and characterized. Key characteristics, such as instrument ILS, spectral resolution, and radiometric performance will be described. Analysis of direct sun measurements taken during testing will also be discussed.
NASA Astrophysics Data System (ADS)
Calbó, Josep; González, Josep-Abel; Sanchez-Lorenzo, Arturo
2017-08-01
Measurement of solar radiation was initiated in Girona, northeast of the Iberian Peninsula, in the late 1980s. Initially, two pyranometers were installed, one of them equipped with a shadowband for measuring the diffuse component. Two other pyranometers currently exist, both ventilated and one of them shadowed, with a sphere, and a pyrheliometer for measuring direct radiation. Additional instruments for other shortwave and longwave components, clouds, and atmospheric aerosols have been installed in recent years. The station is subject to daily inspection, data are saved at high temporal resolution, and instruments are periodically calibrated, all in accordance with the directions of the Baseline Surface Radiation Network. The present paper describes how the entire series of global solar radiation (1987-2014) and diffuse radiation (1994-2014) were built, including the quality control process. Appropriate corrections to the diffuse component were made when a shadowband was employed to make measurements. Analysis of the series reveals that annual mean global irradiance presents a statistically significant increase of 2.5 W m-2 (1.4 %) decade-1 (1988-2014 period), mainly due to what occurs in summer (5.6 W m-2 decade-1). These results constitute the first assessment of solar radiation trends for the northeastern region of the Iberian Peninsula and are consistent with trends observed in the regional surroundings and also by satellite platforms, in agreement with the global brightening phenomenon. Diffuse radiation has decreased at -1.3 W m-2 (-2 %) decade-1 (1994-2014 period), which is a further indication of the reduced cloudiness and/or aerosol load causing the changes.
Sterilization of instruments in solar ovens.
Jørgensen, A F; Nøhr, K; Boisen, F; Nøhr, J
2002-01-01
The sterilization of instruments in rural health clinics in less developed countries is an increasing problem as chemical methods can no longer be recommended and fuel wood is becoming increasingly scarce. It seems obvious, therefore, to utilize solar energy for sterilization purposes. A solar oven was designed and manufactured using local materials and simple tools. It was tested by physical, chemical and microbiological methods and, after successful testing, installed in a rural clinic. The oven was able to generate temperatures above 180 degrees C. On days with direct sunlight the oven fulfilled the international recommendations for hot air sterilization. The chemical indicators, Browne's tubes type 3 and 5, also changed colour. It was difficult to reach the right value for the sterilization effect during months with a low sun position. A moveable oven, or two ovens, must be installed to solve this problem. The solar oven has proven to be a realistic method for the sterilization of instruments. The solar oven is easy to make and use. It saves fuel and can be used in most tropical areas.
An investigation of cloud base height in Chiang Mai
NASA Astrophysics Data System (ADS)
Peengam, S.; Tohsing, K.
2017-09-01
Clouds play very important role in the variation of surface solar radiation and rain formation. To understand this role, it is necessary to know the physical and geometrical of properties of cloud. However, clouds vary with location and time, which lead to a difficulty to obtain their properties. In this work, a ceilometer was installed at a station of the Royal Rainmaking and Agricultural Aviation Department in Chiang Mai (17.80° N, 98.43° E) in order to measure cloud base height. The cloud base height data from this instrument were compared with those obtained from LiDAR, a more sophisticated instrument installed at the same site. It was found that the cloud base height from both instruments was in reasonable agreement, with root mean square difference (RMSD) and mean bias difference (MBD) of 19.21% and 1.58%, respectively. Afterward, a six-month period (August, 2016-January, 2017) of data from the ceilometer was analyzed. The results show that mean cloud base height during this period is 1.5 km, meaning that most clouds are in the category of low-level cloud.
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...
Integrated Sensor Systems for UAS
2008-04-01
2. Optical particle counter 0.27 5.4 3. Pyranometer 0.17 ɘ.2 4. Temp. & relative humidity 0.05 ɘ.1 5. Data acquisition system 0.15 ɘ.2 6...payload volume showing sensor instrument installation. The insert shows the Manta exterior with the cloud droplet probe and pyranometer mounted on...Instrumentation Above- 2.7 Aethalometer cloud 14 Optical particle counter Up and down pyranometers Condensation particle counter In- 3.7
NASA Astrophysics Data System (ADS)
Mattioli, G. S.; Linde, A. T.; Sacks, I. S.; Malin, P. E.; Shalev, E.; Elsworth, D.; Hidayat, D.; Voight, B.; Young, S. R.; Dunkley, P. N.; Herd, R.; Norton, G.
2003-12-01
The CALIPSO Project (Caribbean Andesite Lava Island-volcano Precision Seismo-geodetic Observatory) has greatly enhanced the monitoring and scientific infrastructure at the Soufriere Hills Volcano, Montserrat with the recent installation of an integrated array of borehole and surface geophysical instrumentation at four sites. Each site was designed to be sufficiently hardened to withstand extreme meteorological events (e.g. hurricanes) and only require minimum routine maintenance over an expected observatory lifespan of >30 y. The sensor package at each site includes: a single-component, very broad band, Sacks-Evertson strainmeter, a three-component seismometer ( ˜Hz to 1 kHz), a Pinnacle Technologies series 5000 tiltmeter, and a surface Ashtech u-Z CGPS station with choke ring antenna, SCIGN mount and radome. This instrument package is similar to that envisioned by the Plate Boundary Observatory for deployment on EarthScope target volcanoes in western North America and thus the CALIPSO Project may be considered a prototype PBO installation with real field testing on a very active and dangerous volcano. Borehole sites were installed in series and data acquisition began immediately after the sensors were grouted into position at 200 m depth, with the first completed at Trants (5.8 km from dome) in 12-02, then Air Studios (5.2 km), Geralds (9.4 km), and Olveston (7.0 km) in 3-03. Analog data from the strainmeter (50 Hz sync) and seismometer (200 Hz) were initially digitized and locally archived using RefTek 72A-07 data acquisition systems (DAS) on loan from the PASSCAL instrument pool. Data were downloaded manually to a laptop approximately every month from initial installation until August 2003, when new systems were installed. Approximately 0.2 Tb of raw data in SEGY format have already been acquired and are currently archived at UARK for analysis by the CALIPSO science team. The July 12th dome collapse and vulcanian explosion events were recorded at 3 of the 4 sites. Steel reinforced, poured concrete crypts were constructed to house the surface instruments, data acquisition, telemetry components, and backup battery array with sufficient power to last 10 d without recharging. The central, cross-braced column of the crypt also functions as the monument for the CGPS antenna, which is coupled to a bedrock-grouted 1.5" steel pipe using a precision SCIGN level. In August 2003, the original temporary DAS were replaced with Quanterra Q330 six channel 24 bit systems equipped with PB14 digital packet balers, which can locally buffer up to 20 Gb of strain and seismic data in MSEED packets. All instruments are linked together via a cat 5 IP LAN and data are telemetered from each remote using a single FreeWave FGR-115RE ethernet radio bridge, and where necessary repeater, to the Montserrat Volcano Observatory. Here they are cached prior to transmission via a VPN to UARK for final archival. Detailed schematics and a photo archive are available online.
Purchase and Installation of NanoSIMS 50
NASA Technical Reports Server (NTRS)
Walker, Robert M.
2001-01-01
Although this is a final report on NASA grant number NAG5-8729 we wish to state at the outset that it was mistakenly written as a two-year grant instead of a three-year grant as should have been done. The grant was made for the purpose of purchasing and installing a novel ion microprobe initially called the NanoSIMS 50 and now called the NanoSIMS. The total cost to NASA for purchasing the instrument and refurbishing a laboratory to house it was $1.1 M, split into three installments of $400 (FY 1999), $350K (FY2000), and $350K (FY-2001). We received the first installment in full and $335K in FY2000 for the second installment. The final $350K necessary to complete the purchase and installation was expected by us in the spring of 2001. However, we were recently informed that no more money can be transferred on this grant since it was originally written as a two-year grant. Therefore, we are closing out the current grant and simultaneously writing a new proposal to obtain the final $350K needed to complete the purchase.
Active Vibration Isolation Devices with Inertial Servo Actuators
NASA Astrophysics Data System (ADS)
Melik-Shakhnazarov, V. A.; Strelov, V. I.; Sofiyanchuk, D. V.; Tregubenko, A. A.
2018-03-01
The use of active vibration isolation devices (AVIDs) in aerospace engineering is subject to the following restrictions. First, the volume for installing additional devices is always limited in instrument racks and compartments. Secondly, in many cases, it is impossible to add supports for servo actuators for fundamental or design considerations. In the paper, it has been shown that this problem can be solved if the inertial servo actuators are used in AVIDs instead of reference actuators. A transfer function has been theoretically calculated for an AVID controlled by inertial actuators. It has been shown that the volume of a six-mode single-housing AVID with inertial actuators can be 2-2.5 times smaller than that of devices with support actuators.
NASA Astrophysics Data System (ADS)
Dolci, Mauro; Valentini, Angelo; Tavagnacco, Daniele; Di Cianno, Amico; Straniero, Oscar
2016-08-01
The Antarctic Plateau is one of the best observing sites on Earth, especially for infrared astronomy. The extremely low temperatures (down to -80°C), the low pressure (around 650 mbar) and the very dry atmosphere (PWV less than 1 mm) allow for a very clear and dark sky, as well as for a very low instrumental background. These unique properties, however, make it also very difficult to install and operate astronomical instrumentation. AMICA (Antarctic Multiband Infrared CAmera) is an instrument especially designed for Antarctic operation, whose installation at Dome C has been completed in 2013. Since then it has been continuously working over the last five years, monitoring and controlling in particular the environmental and operating conditions through a dedicated application, its Environmental Control System (ECS). The recorded behavior of AMICA highlighted a set of peculiar aspects of the site that are hard to consider a priori. Although mechanical and electronic COTS components can reliably work in thermally insulated and controlled boxes, simple insulation causes their overheating because of the air dryness and rarefaction which make the heat transfer extremely inefficient. Heat removal is also a real problem when managing heavy-duty devices like cryocoolers, whose excess power removal needs to be fast and efficient. Finally, the lack of an electrical ground generates a wide variety of transient electrical and electromagnetic phenomena which often make electronic instrumentation very unstable. A list of new recommendations is therefore presented, as a guideline for future astronomical instruments operating in Antarctica.
ProtoDESI: First On-Sky Technology Demonstration for the Dark Energy Spectroscopic Instrument
NASA Astrophysics Data System (ADS)
Fagrelius, Parker; Abareshi, Behzad; Allen, Lori; Ballester, Otger; Baltay, Charles; Besuner, Robert; Buckley-Geer, Elizabeth; Butler, Karen; Cardiel, Laia; Dey, Arjun; Duan, Yutong; Elliott, Ann; Emmet, William; Gershkovich, Irena; Honscheid, Klaus; Illa, Jose M.; Jimenez, Jorge; Joyce, Richard; Karcher, Armin; Kent, Stephen; Lambert, Andrew; Lampton, Michael; Levi, Michael; Manser, Christopher; Marshall, Robert; Martini, Paul; Paat, Anthony; Probst, Ronald; Rabinowitz, David; Reil, Kevin; Robertson, Amy; Rockosi, Connie; Schlegel, David; Schubnell, Michael; Serrano, Santiago; Silber, Joseph; Soto, Christian; Sprayberry, David; Summers, David; Tarlé, Greg; Weaver, Benjamin A.
2018-02-01
The Dark Energy Spectroscopic Instrument (DESI) is under construction to measure the expansion history of the universe using the baryon acoustic oscillations technique. The spectra of 35 million galaxies and quasars over 14,000 square degrees will be measured during a 5-year survey. A new prime focus corrector for the Mayall telescope at Kitt Peak National Observatory will deliver light to 5,000 individually targeted fiber-fed robotic positioners. The fibers in turn feed ten broadband multi-object spectrographs. We describe the ProtoDESI experiment, that was installed and commissioned on the 4-m Mayall telescope from 2016 August 14 to September 30. ProtoDESI was an on-sky technology demonstration with the goal to reduce technical risks associated with aligning optical fibers with targets using robotic fiber positioners and maintaining the stability required to operate DESI. The ProtoDESI prime focus instrument, consisting of three fiber positioners, illuminated fiducials, and a guide camera, was installed behind the existing Mosaic corrector on the Mayall telescope. A fiber view camera was mounted in the Cassegrain cage of the telescope and provided feedback metrology for positioning the fibers. ProtoDESI also provided a platform for early integration of hardware with the DESI Instrument Control System that controls the subsystems, provides communication with the Telescope Control System, and collects instrument telemetry data. Lacking a spectrograph, ProtoDESI monitored the output of the fibers using a fiber photometry camera mounted on the prime focus instrument. ProtoDESI was successful in acquiring targets with the robotically positioned fibers and demonstrated that the DESI guiding requirements can be met.
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians help with the installation of the Science Instrument Command and Data Handling Unit, or SIC&DH, on the Multi-Use Lightweight Equipment Carrier. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians help with the installation of the Science Instrument Command and Data Handling Unit, or SIC&DH, on the Multi-Use Lightweight Equipment Carrier. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians look over the Science Instrument Command and Data Handling Unit, or SIC&DH, installed on the Multi-Use Lightweight Equipment Carrier. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians check the Multi-Use Lightweight Equipment Carrier where the Science Instrument Command and Data Handling Unit, or SIC&DH, is being installed. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
1981-01-09
CHALLENGER for an estimated period of six days. The design for the test Borehole Instrumentation Package (BIP) reentry-sub and associated handling...equipment has been completed ard hmi been submitted for vendor bid. Details of the specialized support equipment for installation on the GLOMAR CHALLENGER ...developed under the direction of the Deep Sea Drilling Project (DSDP) by the dynamically positioned drilling vessel GLOMAR CHALLENGER . Deployment of the
2008-01-24
NASA Dryden technicians work on a fit-check mockup in preparation for systems installation work on an Orion boilerplate crew capsule for launch abort testing. A mockup Orion crew module has been constructed by NASA Dryden Flight Research Center's Fabrication Branch. The mockup is being used to develop integration procedures for avionics and instrumentation in advance of the arrival of the first abort flight test article.
2008-01-24
NASA Dryden technicians take measurements inside a fit-check mockup for prior to systems installation on a boilerplate Orion launch abort test crew capsule. A mockup Orion crew module has been constructed by NASA Dryden Flight Research Center's Fabrication Branch. The mockup is being used to develop integration procedures for avionics and instrumentation in advance of the arrival of the first abort flight test article.
THE MARS ORBITER CAMERA IS INSTALLED ON THE MARS GLOBAL SURVEYOR
NASA Technical Reports Server (NTRS)
1996-01-01
In the Payload Hazardous Servicing Facility at KSC, installation is under way of the Mars Orbiter Camera (MOC) on the Mars Global Surveyor spacecraft. The MOC is one of a suite of six scientific instruments that will gather data during a two-year period about Martian topography, mineral distribution and weather. The Mars Global Surveyor is slated for launch aboard a Delta II expendable launch vehicle on November 6, the beginning of a 20-day launch period.
MARS PATHFINDER AIR BAG INSTALLATION IN SAEF-2
NASA Technical Reports Server (NTRS)
1996-01-01
In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), the Jet Propulsion Laboratory (JPL) team installs air bags on the Mars Pathfinder lander. The four airbags will cushion the lander as it touches down on the Martian surface, protecting the delicate instruments and Surveyor small rover inside the tetrahedral-shaped lander. The Mars Pathfinder is one of two Mars-bound spacecraft being prepared for launch this fall. Liftoff is set for Dec. 2 at the beginning of a 24-day launch period.
24 CFR 232.540 - Method of loan payment and amortization period.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Purchase and Installation of Fire Safety Equipment Eligible Security Instruments § 232.540 Method of loan... either 60, 120, or 180 monthly amortization payments. No fire safety loan shall have an amortization...
24 CFR 232.540 - Method of loan payment and amortization period.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Purchase and Installation of Fire Safety Equipment Eligible Security Instruments § 232.540 Method of loan... either 60, 120, or 180 monthly amortization payments. No fire safety loan shall have an amortization...
24 CFR 232.540 - Method of loan payment and amortization period.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Purchase and Installation of Fire Safety Equipment Eligible Security Instruments § 232.540 Method of loan... either 60, 120, or 180 monthly amortization payments. No fire safety loan shall have an amortization...
Long term monitoring of moisture under pavements.
DOT National Transportation Integrated Search
2010-01-01
Monitoring of the environmental instrumentation installed under select pavement sections constructed : by the Ohio Department of Transportation (ODOT) in 1995 on US 23 in Delaware County, Ohio was : continued. The measurements made consisted of soil ...
Embedded Data Acquisition Tools for Rotorcraft Diagnostic Sensors
NASA Technical Reports Server (NTRS)
Wagoner, Robert
2014-01-01
Rotorcraft drive trains must withstand enormous pressure while operating continuously in extreme temperature and vibration environments. Captive components, such as planetary and spiral bevel gears, see enormous strain but are not accessible to fixed instrumentation, such as a piezoelectric transducer. Thus, it is difficult to directly monitor components that are most susceptible to damage. This innovation is a self-contained data processing unit within a specialized fixture that installs directly inside the rotating pinion gear in the gearbox. From this location, it detects and transmits high-resolution prognostic data to a fixed transceiver. The sensor is based on microelectromechanical systems (MEMS) technology and uses innovative circuit designs to capture high-bandwidth data and transmit it wirelessly from inside an operational helicopter transmission. With Ridgetop's advanced MEMS-based sensor, researchers have, for the first time, been able to extract high-resolution acoustic signatures wirelessly from sensors within the transmission that would otherwise be muffled by background gear noises. Ridgetop's innovative instrument will help researchers perform dynamic analysis of gear interaction and develop improved designs for gear components. In addition, data from this instrument can be used to validate new algorithms that detect and predict faults based on external acoustic signatures, for prognostic purposes. The result of this work will be an improvement in safety, performance, and cost for future generations of rotating components.
Yan, Jing; Zhou, Mowei; Gilbert, Joshua D; Wolff, Jeremy J; Somogyi, Árpád; Pedder, Randall E; Quintyn, Royston S; Morrison, Lindsay J; Easterling, Michael L; Paša-Tolić, Ljiljana; Wysocki, Vicki H
2017-01-03
Mass spectrometry continues to develop as a valuable tool in the analysis of proteins and protein complexes. In protein complex mass spectrometry studies, surface-induced dissociation (SID) has been successfully applied in quadrupole time-of-flight (Q-TOF) instruments. SID provides structural information on noncovalent protein complexes that is complementary to other techniques. However, the mass resolution of Q-TOF instruments can limit the information that can be obtained for protein complexes by SID. Fourier transform ion cyclotron resonance mass spectrometry (FT-ICR MS) provides ultrahigh resolution and ultrahigh mass accuracy measurements. In this study, an SID device was designed and successfully installed in a hybrid FT-ICR instrument in place of the standard gas collision cell. The SID-FT-ICR platform has been tested with several protein complex systems (homooligomers, a heterooligomer, and a protein-ligand complex, ranging from 53 to 85 kDa), and the results are consistent with data previously acquired on Q-TOF platforms, matching predictions from known protein interface information. SID fragments with the same m/z but different charge states are well-resolved based on distinct spacing between adjacent isotope peaks, and the addition of metal cations and ligands can also be isotopically resolved with the ultrahigh mass resolution available in FT-ICR.
Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors
NASA Technical Reports Server (NTRS)
Seaman, Calvin H.; Brower, David V.; Le, Suy Q.; Tang, Henry H.
2015-01-01
This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.
Use of hydrated lime as an antistripping additive : installation report.
DOT National Transportation Integrated Search
1983-01-01
The purpose of this investigation is to evaluate the effectiveness of hydrated lime as an antistripping additive in several test sections. The two sections installed in 1982 contain S-5 surface mixes with (1) hydrated lime, (2) a chemical additive, a...
An overview of instrumentation for the Large Binocular Telescope
NASA Astrophysics Data System (ADS)
Wagner, R. Mark
2012-09-01
An overview of instrumentation for the Large Binocular Telescope (LBT) is presented. Optical instrumentation includes the Large Binocular Camera (LBC), a pair of wide-field (27' x 27') mosaic CCD imagers at the prime focus, and the Multi-Object Double Spectrograph (MODS), a pair of dual-beam blue-red optimized long-slit spectrographs mounted at the left and right direct F/15 Gregorian foci incorporating multiple slit masks for multi-object spectroscopy over a 6' field and spectral resolutions of up to 2000. Infrared instrumentation includes the LBT Near-IR Spectroscopic Utility with Camera and Integral Field Unit for Extragalactic Research (LUCI), a modular near-infrared (0.9-2.5 μm) imager and spectrograph pair mounted at the left and right front bent F/15 Gregorian foci and designed for seeing-limited (FOV: 4' × 4') imaging, long-slit spectroscopy, and multiobject spectroscopy utilizing cooled slit masks and diffraction limited (FOV: 0'.5 × 0'.5) imaging and long-slit spectroscopy. Strategic instruments under development that can utilize the full 23-m baseline of the LBT include an interferometric cryogenic beam combiner with near-infrared and thermal-infrared instruments for Fizeau imaging and nulling interferometry (LBTI) and an optical bench near-infrared beam combiner utilizing multi-conjugate adaptive optics for high angular resolution and sensitivity (LINC-NIRVANA). LBTI is currently undergoing commissioning on the LBT and utilizing the installed adaptive secondary mirrors in both single- sided and two-sided beam combination modes. In addition, a fiber-fed bench spectrograph (PEPSI) capable of ultra high resolution spectroscopy and spectropolarimetry (R = 40,000-300,000) will be available as a principal investigator instrument. Over the past four years the LBC pair, LUCI1, and MODS1 have been commissioned and are now scheduled for routine partner science observations. The delivery of both LUCI2 and MODS2 is anticipated before the end of 2012. The availability of all these instruments mounted simultaneously on the LBT permits unique science, flexible scheduling, and improved operational support.
NASA Tropospheric Emission Spectrometer TES Instrument Onboard Aura
2004-04-01
Technicians install NASA's Tropospheric Emission Spectrometer (TES) instrument on NASA's Aura spacecraft prior to launch. Launched in July 2004 and designed to fly for two years, the TES mission is currently in an extended operations phase. Mission managers at NASA's Jet Propulsion Laboratory, Pasadena, California, are evaluating an alternate way to collect and process science data from the Tropospheric Emission Spectrometer (TES) instrument on NASA's Aura spacecraft following the age-related failure of a critical instrument component. TES is an infrared sensor designed to study Earth's troposphere, the lowermost layer of Earth's atmosphere, which is where we live. The remainder of the TES instrument, and the Aura spacecraft itself, are operating as expected, and TES continues to collect science data. TES is one of four instruments on Aura, three of which are still operating. http://photojournal.jpl.nasa.gov/catalog/PIA15608
V/STOL tilt rotor research aircraft. Volume 3: Ship 2 instrumentation
NASA Technical Reports Server (NTRS)
1978-01-01
Information covering sensor cables, sensor installation, and sensor calibration for the XV-15 aircraft number 2 is included. For each junction box (J-box) designation there is a schematic of the J-box disconnect harness, instrumentation worksheets which show sensor location, and calibration data sheets for each sensor associated with that J-box. An index of measurement data codes to J-box locations is given in a table. Cross references are given.
Recharge monitoring in an interplaya setting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scanlon, B.R.; Reedy, R.C.; Liang, J.
1999-03-01
The objective of this investigation is to monitor infiltration in response to precipitation events in an interplaya setting. The authors evaluated data gathered from the interplaya recharge monitoring installation at the Pantex Plant from March through December 1998. They monitored thermocouple psychrometer (TCP) instruments to measure water potential and time-domain reflectometry (TDR) probes to measure water content and bulk soil conductivity. Heat-dissipation sensor (HDS) instruments were monitored to supplement the TCP data.
V/STOL tilt rotor research aircraft. Volume 2: Ship 1 instrumentation
NASA Technical Reports Server (NTRS)
1978-01-01
Information covering sensor cables, sensor installation, and sensor calibration for the XV-15 aircraft number 1 is included. For each junction box (J-box) designation there is a schematic of the J-box disconnect harness instrumentation worksheets which show sensor location, and calibration data sheets for each sensor associated with that J-box. An index of measurement item codes to J-box locations is given in a table. Cross references are given.
1979-04-01
two generators. A 7-5-kW vacu-flow air- cooled generator was installed in the trailer to power the instrumentation. The heating , air...off power. 2. A test facility which would allow the emission tests to be conducted at designated airport run-up locations. Since emission...near the airport runways. The remote location led to instrumentation. -*—*-*——- ■- ---’-• ■ - - - together with bottled gases
Evaluation of the new infrastructure for French Permanent Broadband Stations in Auvergne (France).
NASA Astrophysics Data System (ADS)
Douchain, J. M.; Regis, E.; Battaglia, J.; Vergne, J.
2017-12-01
French seismologic and geodetic network (RESIF) is a national equipment for the observation and understanding of the solid Earth. It is an instrument aimed at acquiring new top-quality data for disciplines like seismology, geodesy and gravimetry to advance the understanding of the dynamics of our planet. The seismology component of RESIF, with its homogeneous coverage of the territory, will allow better localisation and characterisation of seismic activityover a wide range of magnitudes as well as provide high quality data for research The Auvergne Seismic Network (ASN) manages seismic stations in the center of france since the beginning of the 80's and continuously ugrades them. Nowadays, 21 stations (velocimeters and accelerometers) are deployed to monitor the Massif Central seismic activity. In the future, the ASN will run 15 broadband stations that will be part of RESIF network. Six of theses sites already have former generation instrumentation (short period sensors buried in the ground, low dynamic) but others are completely new. In june 2017, 4 permanent seismic stations have been upgraded to the new standard installation type for open environment. The chozen infrastructure is a 5 meter drilling equiped with a posthole broadband sensor. Prior to these final installations, on each site, Trillium 120 PA have been installed for 2 temporary experiments. The first one consisted of a direct burial installations at about 80 centimeters depth and lasted for 1 or 2 months. The second dataset was recorded in shallow seismic vaults, during 6 months.In this study, we compare, for each site, data recorded with the 3 configurations in order to evaluate the profits of the new RESIF installations. For this purpose, we compare the probability density fonctions to evaluate noise levels, as well as sprectrograms and hourly detection number. Our results show that the installation of sensors in drillings greatly improves the quality of data at low and high frequencies.
The Marseille Observatory 1860-1920: missed opportunities and elebrated achievements
NASA Astrophysics Data System (ADS)
Caplan, James
2001-10-01
After summarizing the early history of the Marseille Observatory (founded by the Jesuits and operational in 1702), I describe the circumstances leading to the takeover by Le Verrier in the 1860s. The observatory was rebuilt on the Plateau Longchamp and new instruments were installed, most notably the 80-cm Foucault glass-mirror telescope. The work of the new observatory is then presented, and the instruments described, starting with the Le Verrier period and continuing through the long directorship of Stephan, and then Bourget. The overall success of the observatory in its Longchamp site was due in part to the assiduous pursuit of routine observations and to the discovery of comets and asteroids, combined with the `exploratory' observations of `nebulae' by Stephan. In addition, the first stellar interferometry observations, and the first applications of the Fabry-Perot interferometer to nebular observations, were important achievements. On the other hand, the failure in the beginning of the twentieth century to adapt the telescopes to photography condemned the observatory to a long period of missed opportunities, from which it did not recover for several decades.
THE NEW YORK MIDTOWN DISPERSION STUDY (MID-05) METEOROLOGICAL DATA REPORT.
DOE Office of Scientific and Technical Information (OSTI.GOV)
REYNOLDS,R.M.; SULLIVAN, T.M.; SMITH, S.
2007-01-01
The New York City midtown dispersion program, MID05, examined atmospheric transport in the deep urban canyons near Rockefeller Center. Little is known about air flow and hazardous gas dispersion under such conditions, since previous urban field experiments have focused on small to medium sized cities with much smaller street canyons and examined response over a much larger area. During August, 2005, a series of six gas tracer tests were conducted and sampling was conducted over a 2 km grid. A critical component of understanding gas movement in these studies is detailed wind and meteorological information in the study zone. Tomore » support data interpretation and modeling, several meteorological stations were installed at street level and on roof tops in Manhattan. In addition, meteorological data from airports and other weather instrumentation around New York City were collected. This document describes the meteorological component of the project and provides an outline of data file formats for the different instruments. These data provide enough detail to support highly-resolved computational simulations of gas transport in the study zone.« less
Interstate-35 bridge instrumentation renaissance.
DOT National Transportation Integrated Search
2012-09-01
An updated, accelerometer-based, sensor and data acquisition system was installed and verified on the I-35 Walnut Creek Bridge in Purcell, Oklahoma. The data collection system also includes a microwave communication system to move sensor and video da...
NASA Technical Reports Server (NTRS)
Kegley, Jeffrey; Haight, Harlan; Hogue, William; Carpenter, Jay; Siler, Richard; Wright, Ernie; Eng, Ron; Baker, Mark; McCracken, Jeff
2005-01-01
Marshall Space Flight Center's X-ray & Cryogenic Test Facility (XRCF) has been performing optical wavefront testing and thermal structural deformation testing at subliquid nitrogen cryogenic temperatures since 1999. Recent modifications have been made to the facility in support of the James Webb Space Telescope (JWST) program. The test article envelope and the chamber's refrigeration capacity have both been increased. A new larger helium-cooled enclosure has been added to the existing enclosure increasing both the cross-sectional area and the length. This new enclosure is capable of supporting six JWST Primary Mirror Segment Assemblies. A second helium refrigeration system has been installed essentially doubling the cooling capacity available at the facility. Modifications have also been made to the optical instrumentation area. Improved access is now available for both the installation and operation of optical instrumentation outside the vacuum chamber. Chamber configuration, specifications, and performance data will be presented.
1996-08-19
KENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility at KSC, installation is under way of the Mars Orbiter Camera (MOC) on the Mars Global Surveyor spacecraft. The MOC is one of a suite of six scientific instruments that will gather data about Martian topography, mineral distribution and weather during a two-year period. The Mars Global Surveyor is slated for launch aboard a Delta II expendable launch vehicle on Nov. 6, the beginning of a 20-day launch period.
Manometer Boards below the 8- by 6-Foot Supersonic Wind Tunnel
1951-02-21
Analysts at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory take data readings from rows of manometers in the basement of the 8- by 6-Foot Supersonic Wind Tunnel. Manometers were mercury-filled glass tubes that indicated different pressure levels in the test section. Manometers look and function very similarly to thermometers. Pressure sensing instruments were installed on the test article inside the wind tunnel or other test facility. Each test could have dozens of such instruments installed and connected to a remotely located manometer tube. The mercury inside the manometer rose and fell with the pressure levels. The dark mercury can be seen at different levels within the tubes. Since the pressure readings were dynamic, it was necessary to note the levels at given points during the test. This was done using both female computers and photography. A camera is seen on a stand to the right in this photograph.
Plot-scale field experiment of surface hydrologic processes with EOS implications
NASA Technical Reports Server (NTRS)
Laymon, Charles A.; Macari, Emir J.; Costes, Nicholas C.
1992-01-01
Plot-scale hydrologic field studies were initiated at NASA Marshall Space Flight Center to a) investigate the spatial and temporal variability of surface and subsurface hydrologic processes, particularly as affected by vegetation, and b) develop experimental techniques and associated instrumentation methodology to study hydrologic processes at increasingly large spatial scales. About 150 instruments, most of which are remotely operated, have been installed at the field site to monitor ground atmospheric conditions, precipitation, interception, soil-water status, and energy flux. This paper describes the nature of the field experiment, instrumentation and sampling rationale, and presents preliminary findings.
Retrofitting tractors with rollover protective structures: perspective of equipment dealers.
Tonelli, S M; Donham, K J; Leedom-Larson, K; Sanderson, W; Purschwitz, M
2009-10-01
This study was one of a cluster of studies that originated via requests for proposals from the NIOSH National Agricultural Tractor Safety Initiative. The present study design consisted of several steps: (1) formation of an advisory group, (2) development and testing of a standard paper self-responding survey instrument, (3) sample selection of farm equipment dealers, (4) administration of the survey, (5) assessment and analysis of the survey, and (6) in-person response panel of dealers (n = 80) to review results of the questionnaire for further definition and sharpening of the recommendations from the survey. A key finding is that most dealers do not currently sell or install ROPS retrofit kits. Barriers cited by dealers included (1) actual or perceived lack of farmer demand, (2) injury liability, (3) expensive freight for ordering ROPS, (4) lack of dealer awareness of the magnitude of deaths from tractor overturns and the high life-protective factor of ROPS, and (5) difficulty and incursion of non-recoverable expenses in locating and obtaining specific ROPS. Despite not currently selling or installing ROPS, dealers responded favorably about their future potential role in ROPS promotion and sales. Dealers were willing to further promote, sell, and install ROPS if there was demand from farmers. Recommendations include establishing a ROPS "clearing house" that dealers could contact to facilitate locating and obtaining ROPS orders from customers. Additional recommendations include education and social marketing targeting farm machinery dealers as well farmers, manufacturers, and policy makers.
NASA Astrophysics Data System (ADS)
Rumyantsev, Valery D.; Ashcheulov, Yury V.; Chekalin, Alexander V.; Chumakov, Yury S.; Shvarts, Maxim Z.; Timofeev, Vladimir V.
2014-09-01
As a rule, the HCPV modules are mounted on solar trackers in a form of a flat panel. Wind pressure is one of the key factors limiting the operation capabilities of such type solar installations. At the PV Lab of the Ioffe Institute, the sun-trackers with step-like frame for modules have been proposed and developed, which have a potential for significant reduction of wind pressure. Such a reduction is realized in a wide range of the frame tilt angles the most typical for day-light operation of solar installations. In the present work, theoretical consideration and indoor experiments with mechanical models of installation frames have been carried out. A wind tunnel has been used as an experimental instrument for quantitative comparison in conventional units of expected wind loads on module frames of different designs.
Characterization Tests of WFC3 Filters
NASA Technical Reports Server (NTRS)
Baggett, S.; Boucarut, R.; Telfer, R.; Quijano, J. Kim; Quijada, M.; Arsenovic, P.; Brown, T.; Dailey, M.; Figer, D.; Hilbert, B.
2006-01-01
The WFC3 instrument to be installed on HST during the next servicing mission consists of a UVIS and an IR channel. Each channel is allocated its own complement of filters: 48 elements for the UVIS (42 filters, 5 quads, and 1 UV grism) and 17 slots for the IR (15 filters and 2 grisms). While a majority of the UVIS filters exhibit excellent performance consistent with or exceeding expectations, a subset show significant filter ghosts. Procurement of improved replacement filters is in progress and a summary of the characterization tests being performed on the new filters is presented. In the IR channel, while no filter ghosting was detected in any of the filters during thermal vacuum testing, the grisms were found to be installed incorrectly; they have been removed and will be reinstalled. In addition, due to the significantly improved response blueward of 800nm expected in the new substrate-removed IR detector (see Invited talk by R.A.Kimble, this volume), two IR filters originally constructed on a fused silica substrate are being remade using an IR transmitting color glass to block any visible light transmission. Tests of the new IR filters and preparations for the grism reinstallation are summarized
Pre-concentration technique for reduction in "Analytical instrument requirement and analysis"
NASA Astrophysics Data System (ADS)
Pal, Sangita; Singha, Mousumi; Meena, Sher Singh
2018-04-01
Availability of analytical instruments for a methodical detection of known and unknown effluents imposes a serious hindrance in qualification and quantification. Several analytical instruments such as Elemental analyzer, ICP-MS, ICP-AES, EDXRF, ion chromatography, Electro-analytical instruments which are not only expensive but also time consuming, required maintenance, damaged essential parts replacement which are of serious concern. Move over for field study and instant detection installation of these instruments are not convenient to each and every place. Therefore, technique such as pre-concentration of metal ions especially for lean stream elaborated and justified. Chelation/sequestration is the key of immobilization technique which is simple, user friendly, most effective, least expensive, time efficient; easy to carry (10g - 20g vial) to experimental field/site has been demonstrated.
Hara, Toru
2014-11-01
IntroductionWe installed the first "orthogonally-arranged" FIB-SEM in 2011. The most characteristic point of this instrument is that the FIB and SEM columns are perpendicularly mounted; this is specially designed to obtain a serial-sectioning dataset more accurately and precisely with higher contrast and higher spatial resolution compare to other current FIB-SEMs [1]. Since the installation in 2011, we have developed the hardware and methodology of the serial-sectioning based on this orthogonal FIB-SEM. In order to develop this technique, we have widely opened this instrument to every researcher of all fields. In the presentation, I would like to introduce some of application results that are obtained by users of this instrument. The characteristic points of the orthogonal systemFigure 1 shows a difference between the standard and the orthogonal FIB-SEM systems: In the standard system, shown in Fig.1(a), optical axes of a FIB and a SEM crosses around 60deg., while in the orthogonal system (Fig.1(b)), they are perpendicular to each other. The standard arrangement (a) is certainly suitable for TEM lamellae preparation etc. because the FIB and the SEM can see the same position simultaneously. However, for a serial-sectioning, it is not to say the best arrangement. One of the reasons is that the sliced plane by the FIB is not perpendicular to the electron beam so that the background contrast is not uniform and observed plane is distorted. On the other hand, in case of the orthogonally-arranged system,(b), these problems are resolved. In addition, spatial resolution can keep high enough even in a low accelerating voltage (e.g. 500V) because a working distance is set very small, 2mm. From these special design, we can obtain the serial-sectioning dataset from rather wide area (∼100um) with high spatial resolution (Max. 2×2×2nm). As this system has many kinds of detectors: SE, ET, Backscatter Electron(Energy-selective), EDS, EBSD, STEM(BF&ADF), with Ar+ ion-gun and a plasma cleaner, many kinds of signals can be obtained simultaneously.jmicro;63/suppl_1/i5-a/DFU077F1F1DFU077F1Fig. 1.Schematic illustration described (a) a standard type arrangement, (b) an orthogonal type arrangement. Recent topics and Future prospectsWe have applied this instrument for wide area of microstructure analysis; Metals and Alloys, Semiconductor devices, Battery electrodes, Minerals, Biomaterials, and so on. In my presentation, I would like to introduce some of our application results and will discuss about future development of the methodology of a FIB-SEM serial sectioning. As the applied research field becomes wider, various requests for the method were arisen. However, most requests can be summarized as follows: observation of larger area, expansion of applicable sample, obtain many kind of information, linkage with other instruments. AcknowledgmentsThe instrument introduced in this work was installed at NIMS by a part of "Low-carbon research network Japan" funded by the MEXT,Japan. © The Author 2014. Published by Oxford University Press on behalf of The Japanese Society of Microscopy. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
Increasing Usability in Ocean Observing Systems
NASA Astrophysics Data System (ADS)
Chase, A. C.; Gomes, K.; O'Reilly, T.
2005-12-01
As observatory systems move to more advanced techniques for instrument configuration and data management, standardized frameworks are being developed to benefit from commodities of scale. ACE (A Configuror and Editor) is a tool that was developed for SIAM (Software Infrastructure and Application for MOOS), a framework for the seamless integration of self-describing plug-and-work instruments into the Monterey Ocean Observing System. As a comprehensive solution, the SIAM infrastructure requires a number of processes to be run to configure an instrument for use within its framework. As solutions move from the lab to the field, the steps needed to implement the solution must be made bulletproof so that they may be used in the field with confidence. Loosely defined command line interfaces don't always provide enough user feedback and business logic can be difficult to maintain over a series of scripts. ACE is a tool developed for guiding the user through a number of complicated steps, removing the reliance on command-line utilities and reducing the difficulty of completing the necessary steps, while also preventing operator error and enforcing system constraints. Utilizing the cross-platform nature of the Java programming language, ACE provides a complete solution for deploying an instrument within the SIAM infrastructure without depending on special software being installed on the users computer. Requirements such as the installation of a Unix emulator for users running Windows machines, and the installation of, and ability to use, a CVS client, have all been removed by providing the equivalent functionality from within ACE. In order to achieve a "one stop shop" for configuring instruments, ACE had to be written to handle a wide variety of functionality including: compiling java code, interacting with a CVS server and maintaining client-side CVS information, editing XML, interacting with a server side database, and negotiating serial port communications through Java. This paper will address the relative tradeoffs of including all the afore-mentioned functionality in a single tool, its affects on user adoption of the framework (SIAM) it provides access to, as well as further discussion of some of the functionality generally pertinent to data management (XML editing, source code management and compilation, etc).
Health Physics Code System for Evaluating Accidents Involving Radioactive Materials.
DOE Office of Scientific and Technical Information (OSTI.GOV)
2014-10-01
Version 03 The HOTSPOT Health Physics codes were created to provide Health Physics personnel with a fast, field-portable calculational tool for evaluating accidents involving radioactive materials. HOTSPOT codes provide a first-order approximation of the radiation effects associated with the atmospheric release of radioactive materials. The developer's website is: http://www.llnl.gov/nhi/hotspot/. Four general programs, PLUME, EXPLOSION, FIRE, and RESUSPENSION, calculate a downwind assessment following the release of radioactive material resulting from a continuous or puff release, explosive release, fuel fire, or an area contamination event. Additional programs deal specifically with the release of plutonium, uranium, and tritium to expedite an initial assessmentmore » of accidents involving nuclear weapons. The FIDLER program can calibrate radiation survey instruments for ground survey measurements and initial screening of personnel for possible plutonium uptake in the lung. The HOTSPOT codes are fast, portable, easy to use, and fully documented in electronic help files. HOTSPOT supports color high resolution monitors and printers for concentration plots and contours. The codes have been extensively used by the DOS community since 1985. Tables and graphical output can be directed to the computer screen, printer, or a disk file. The graphical output consists of dose and ground contamination as a function of plume centerline downwind distance, and radiation dose and ground contamination contours. Users have the option of displaying scenario text on the plots. HOTSPOT 3.0.1 fixes three significant Windows 7 issues: Executable installed properly under "Program Files/HotSpot 3.0". Installation package now smaller: removed dependency on older Windows DLL files which previously needed to; Forms now properly scale based on DPI instead of font for users who change their screen resolution to something other than 100%. This is a more common feature in Windows 7; Windows installer was starting everytime most users started the program, even after HotSpot was already installed. Now, after the program is installed the installer may come up once for each new user but only the first time they run HotSpot on a particular machine. So no user should see the installer come up more than once over many uses; and GPS capability updated to directly use a serial port through a USB connection. Non-USB connections should still work. Fixed table output inconsistencies for fire scenarios.« less
NASA Technical Reports Server (NTRS)
Taube, L. J.
1972-01-01
This volume contains cost, schedule, and technical information on the following B-70 aircraft subsystems: air induction system, flight control, personnel accommodation and escape, alighting and arresting, mission and traffic control, flight indication, test instrumentation, and installation, checkout, and pre-flight.
Monitoring of the Permeable Pavement Demonstration Site at the Edison Environmental Center (Poster)
This is a poster on the permeable pavement parking lot at the Edison Environmental Center. The monitoring scheme for the project is discussed in-depth with graphics explaining the instrumentation installed at the site.
ERIC Educational Resources Information Center
Agriopoulos, Michel
1981-01-01
Describes a program in Algeria which included the construction of a training facility to ease the shortage of semiskilled workers, particularly construction site electricians and instrument installers. Priorities were to define training needs, implement the program, and produce graduates as soon as possible. (JOW)
Bluetooth traffic detectors for use as permanently installed travel time instruments : [summary].
DOT National Transportation Integrated Search
2012-02-01
In support of the Maryland State Highway Administration (SHA) business objectives : related to mobility and congestion relief, in 2009 the University of Marylands (UMD) : Center for Advanced Transportation Technology (CATT) proposed to develop the...
Bluetooth traffic detectors for use as permanently installed travel time instruments.
DOT National Transportation Integrated Search
2012-02-06
In February 2009, the University of Marylands (UMD) Center for Advanced Transportation Technology : (CATT) via a research grant from the Maryland State Highway Administration (SHA) set out to extend : Bluetooth TM traffic monitoring (BTM) technolo...
Installation report : evaluation of asphalt additives.
DOT National Transportation Integrated Search
1987-01-01
Five asphalt additives that are supposed to improve the stability and flexibility characteristics of asphalt concrete were installed in pavement test sections on Route 58 in Halifax County. Polymers, latex rubbers, and a diatomaceous deposit were use...
Long-term Self-noise Estimates of Seismic Sensors From a High-noise Vault
NASA Astrophysics Data System (ADS)
Hicks, S. P.; Goessen, S.; Hill, P.; Rietbrock, A.
2017-12-01
To understand the detection capabilities of seismic stations and for reducing biases in ambient noise imaging, it is vital to assess the contribution of instrument self-noise to overall site noise. Self-noise estimates typically come from vault installations in continental interiors with very low ambient noise levels. However, this approach restricts the independent assessment of self-noise by individual end-users to assess any variations in their own instrument pools from nominal specifications given by manufacturers and from estimations given in comparative test papers. However, the calculation method should be adapted to variable installation conditions. One problem is that microseism noise can contaminate self-noise results caused by instrument misalignment errors or manufacturing limits; this effect becomes stronger where ambient noise is higher. Moreover, due to expected stochastic and time-varying sensor noise, estimates based on hand-picking small numbers of data segments may not accurately reflect true self-noise. We report on results from a self-noise test experiment of Güralp seismic instruments (3T, 3ESPC broadband seismometers, Fortis strong motion accelerometer) that were installed in the sub-surface vault of the Eskdalemuir Seismic Observatory in Scotland, UK over the period October 2016-August 2017. Due to vault's proximity to the ocean, secondary microseism noise is strong, so we efficiently compute the angle of misalignment that maximises waveform coherence with a reference sensor. Self-noise was calculated using the 3-sensor correlation technique and we compute probability density functions of self-noise to assess its spread over time. We find that not correcting for misalignments as low as 0.1° can cause self-noise to be artificially higher by up to 15 dB at frequencies of 0.1-1 Hz. Our method thus efficiently removes the effect of microseism contamination on self-noise; for example, it restores the minimum noise floor for a 360s - 50 Hz 3T to -195 dB at 0.2 Hz. Furthermore, based on the analysis of our calculated probability density functions, we find at long-periods (> 30 s) the average self-noise can be up to 5 dB higher than the minimum noise floor. We discuss the validity of these results in terms of making direct comparisons with self-noise results from much quieter installations.
NASA Technical Reports Server (NTRS)
Jacobsen, R. A.; Bivens, C. C.; Rediess, N. A.; Hindson, W. S.; Aiken, E. W.; Aiken, Edwin W. (Technical Monitor)
1995-01-01
The Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL) is a UH-60A Black Hawk helicopter that is being modified by the US Army and NASA for flight systems research. The principal systems that are being installed in the aircraft are a Helmet Mounted Display (HMD) and imaging system, and a programmable full authority Research Flight Control System (RFCS). In addition, comprehensive instrumentation of both the rigid body of the helicopter and the rotor system is provided. The paper will describe the capabilities of these systems and their current state of development. A brief description of initial research applications is included. The wide (40 X 60 degree) field-of-view HMD system has been provided by Kaiser Electronics. It can be configured as a monochromatic system for use in bright daylight conditions, a two color system for darker ambients, or a full color system for use in night viewing conditions. Color imagery is achieved using field sequential video and a mechanical color wheel. In addition to the color symbology, high resolution computer-gene rated imagery from an onboard Silicon Graphics Reality Engine Onyx processor is available for research in virtual reality applications. This synthetic imagery can also be merged with real world video from a variety of imaging systems that can be installed easily on the front of the helicopter. These sensors include infrared or tv cameras, or potentially small millimeter wave radars. The Research Flight Control System is being developed for the aircraft by a team of contractors led by Boeing Helicopters. It consists of a full authority high bandwidth fly-by-wire actuators that drive the main rotor swashplate actuators and the tail rotor actuator in parallel. This arrangement allows the basic mechanical flight control system of the Black Hawk to be retained so that the safety pilot can monitor the operation of the system through the action of his own controls. The evaluation pilot will signal the fly-by-wire actuators through the flight computer from electrical sidearm controllers located in the right hand cockpit. The system will have very substantial input/output capacity and impressive computational power. These systems are installed in the aircraft using predominantly a MIL-STD 1553B data bus architecture. Sensor data from the RFCS, the basic aircraft and rotor system instrumentation including navigation information, and the HMD system are easily exchanged among user systems, or are available at the systems operator station located in the cabin for real time monitoring or data recording.
ProtoDESI: First On-Sky Technology Demonstration for the Dark Energy Spectroscopic Instrument
Fagrelius, Parker; Abareshi, Behzad; Allen, Lori; ...
2018-01-15
The Dark Energy Spectroscopic Instrument (DESI) is under construction to measure the expansion history of the universe using the baryon acoustic oscillations technique. The spectra of 35 million galaxies and quasars over 14,000 square degrees will be measured during a 5-year survey. A new prime focus corrector for the Mayall telescope at Kitt Peak National Observatory will deliver light to 5,000 individually targeted fiber-fed robotic positioners. The fibers in turn feed ten broadband multi-object spectrographs. We describe the ProtoDESI experiment, that was installed and commissioned on the 4-m Mayall telescope from 2016 August 14 to September 30. ProtoDESI was anmore » on-sky technology demonstration with the goal to reduce technical risks associated with aligning optical fibers with targets using robotic fiber positioners and maintaining the stability required to operate DESI. The ProtoDESI prime focus instrument, consisting of three fiber positioners, illuminated fiducials, and a guide camera, was installed behind the existing Mosaic corrector on the Mayall telescope. A fiber view camera was mounted in the Cassegrain cage of the telescope and provided feedback metrology for positioning the fibers. ProtoDESI also provided a platform for early integration of hardware with the DESI Instrument Control System that controls the subsystems, provides communication with the Telescope Control System, and collects instrument telemetry data. In conclusion, lacking a spectrograph, ProtoDESI monitored the output of the fibers using a fiber photometry camera mounted on the prime focus instrument. ProtoDESI was successful in acquiring targets with the robotically positioned fibers and demonstrated that the DESI guiding requirements can be met.« less
1997-01-22
KENNEDY SPACE CENTER, FLA. - STS-82 crew members and workers at KSC's Vertical Processing Facility get a final look at the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) in its flight configuration for the STS-82 mission. The crew is participating in the Crew Equipment Integration Test (CEIT). NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument - its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is scheduled Feb. 11 aboard Discovery with a crew of seven.
ProtoDESI: First On-Sky Technology Demonstration for the Dark Energy Spectroscopic Instrument
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fagrelius, Parker; Abareshi, Behzad; Allen, Lori
The Dark Energy Spectroscopic Instrument (DESI) is under construction to measure the expansion history of the universe using the baryon acoustic oscillations technique. The spectra of 35 million galaxies and quasars over 14,000 square degrees will be measured during a 5-year survey. A new prime focus corrector for the Mayall telescope at Kitt Peak National Observatory will deliver light to 5,000 individually targeted fiber-fed robotic positioners. The fibers in turn feed ten broadband multi-object spectrographs. We describe the ProtoDESI experiment, that was installed and commissioned on the 4-m Mayall telescope from 2016 August 14 to September 30. ProtoDESI was anmore » on-sky technology demonstration with the goal to reduce technical risks associated with aligning optical fibers with targets using robotic fiber positioners and maintaining the stability required to operate DESI. The ProtoDESI prime focus instrument, consisting of three fiber positioners, illuminated fiducials, and a guide camera, was installed behind the existing Mosaic corrector on the Mayall telescope. A fiber view camera was mounted in the Cassegrain cage of the telescope and provided feedback metrology for positioning the fibers. ProtoDESI also provided a platform for early integration of hardware with the DESI Instrument Control System that controls the subsystems, provides communication with the Telescope Control System, and collects instrument telemetry data. In conclusion, lacking a spectrograph, ProtoDESI monitored the output of the fibers using a fiber photometry camera mounted on the prime focus instrument. ProtoDESI was successful in acquiring targets with the robotically positioned fibers and demonstrated that the DESI guiding requirements can be met.« less
Measurement of OH, H2SO4, MSA, NH3 and DMSO Aboard the NASA P-3B Aircraft
NASA Technical Reports Server (NTRS)
Eisele, Fred
2001-01-01
This project involved the installation of a downsized multichannel mass spectrometer instrument on the NASA P-3B aircraft and its subsequent use on the PEM-Tropics B mission. The new instrument performed well, measuring a number of difficult-to-measure compounds and providing much new photochemical and sulfur data as well as possibly uncovering a new nighttime DMSO source. The details of this effort are discussed.
Diesel Combustion Fundamentals. Phase 1. Volume 1. Technical Report.
1987-07-01
C02 ), oxides of nitrogen (NOx), oxygen (02), and unburned hydrocarbons (HC). The instruments for measuring CO and CO2 emissions were Beckman *1 model...emissions. Oxygen levels in the exhaust were measured with a Beckman model 742 amperometric analyzer. These instruments were installed in a bench...nuing the use of this sensor system. First, the location of the window was such that it did not see a large enough volume of the pre-chamber to
1987-06-01
commercial products. · OP -- Typical cutout at a plumbiinc location where an automated monitoring system has bv :• installed. The sensor used with the...This report provides a description of commercially available sensors , instruments, and ADP equipment that may be selected to fully automate...automated. The automated plumbline monitoring system includes up to twelve sensors , repeaters, a system controller, and a printer. The system may
EXTENDING THE USEFUL LIFE OF OLDER MASS SPECTROMETERS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, S.; Cordaro, J.; Holland, M.
2010-06-17
Thermal ionization and gas mass spectrometers are widely used across the Department of Energy (DOE) Complex and contractor laboratories. These instruments support critical missions, where high reliability and low measurement uncertainty are essential. A growing number of these mass spectrometers are significantly older than their original design life. The reality is that manufacturers have declared many of the instrument models obsolete, with direct replacement parts and service no longer available. Some of these obsolete models do not have a next generation, commercially available replacement. Today's budget conscious economy demands for the use of creative funds management. Therefore, the ability tomore » refurbish (or upgrade) these valuable analytical tools and extending their useful life is a cost effective option. The Savannah River Site (SRS) has the proven expertise to breathe new life into older mass spectrometers, at a significant cost savings compared to the purchase and installation of new instruments. A twenty-seven year old Finnigan MAT-261{trademark} Thermal Ionization Mass Spectrometer (TIMS), located at the SRS F/H Area Production Support Laboratory, has been successfully refurbished. Engineers from the Savannah River National Laboratory (SRNL) fabricated and installed the new electronics. These engineers also provide continued instrument maintenance services. With electronic component drawings being DOE Property, other DOE Complex laboratories have the option to extend the life of their aged Mass Spectrometers.« less
UAVSAR Instrument: Current Operations and Planned Upgrades
NASA Technical Reports Server (NTRS)
Lou, Yunling; Hensley, Scott; Chao, Roger; Chapin, Elaine; Heavy, Brandon; Jones, Cathleen; Miller, Timothy; Naftel, Chris; Fratello, David
2011-01-01
The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) instrument is a pod-based Lband polarimetric synthetic aperture radar (SAR), specifically designed to acquire airborne repeat track SAR data for differential interferometric measurements. This instrument is currently installed on the NASA Gulfstream- III (G-III) aircraft with precision real-time Global Positioning System (GPS) and a sensor-controlled flight management system for precision repeat-pass data acquisitions. UAVSAR has conducted engineering and preliminary science data flights since October 2007 on the G-III. We are porting the radar to the Global Hawk Unmanned Airborne Vehicle (UAV) to enable long duration/long range data campaigns. We plan to install two radar pods (each with its own active array antenna) under the wings of the Global Hawk to enable the generation of precision topographic maps and single pass polarimetric-interferometry (SPI) providing vertical structure of ice and vegetation. Global Hawk's range of 8000 nm will enable regional surveys with far fewer sorties as well as measurements of remote locations without the need for long and complicated deployments. We are also developing P-band polarimetry and Ka-band single-pass interferometry capabilities on UAVSAR by replacing the radar antenna and front-end electronics to operate at these
1997-02-21
The STS-82 crew stands in front of the Space Shuttle Discovery after landing at KSC's Shuttle Landing Facility on Runway 15 to conclude a 10-day mission to service the orbiting Hubble Space Telescope (HST). Crew members are (from left to right) Mission Specialist Steven A. Hawley, Mission Commander Kenneth D. Bowersox, Mission Specialist Joseph R. "Joe" Tanner, Pilot Scott J. "Doc" Horowitz, Mission Specialist Gregory J. Harbaugh, Payload Commander Mark C. Lee and Mission Specialist Steven L. Smith. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997
NASA Technical Reports Server (NTRS)
Swanson, G. T.; Santos, J. A.; White, T. R.; Bruce, W. E.; Kuhl, C. A.; Wright, H. S.
2017-01-01
Mars 2020 will fly the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) sensor suite consisting of a total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer embedded in the thermal protection system (TPS). Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020's predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12" by 12" test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuum/ cycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation. This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.
NASA Astrophysics Data System (ADS)
Proper, Megan Longo
I present an indirect search for Dark Matter using the High Altitude Water Cherenkov (HAWC) gamma-ray observatory. There is significant evidence for dark matter within the known Universe, and we can set constraints on the dark matter annihilation cross-section using dark matter rich sources. Dwarf spheroidal galaxies (dSphs) are low luminosity galaxies with little to no gas or dust, or recent star formation. In addition, the total mass of a dwarf spheroidal galaxy, as inferred from gravitational effects observed within the galaxy, is many times more than the luminous mass, making them extremely dark matter rich. For these reasons dSphs are prime targets for indirect dark matter searches with gamma rays. Dark matter annihilation cross-section limits are presented for 14 dSphs within the HAWC field of view, as well as a combined limit with all sources. The limits presented here are for dark matter masses ranging from 0.5 TeV to 1000 TeV. At lower dark matter masses, the HAWC-111 limits are not competitive with other gamma-ray experiments, however it will be shown that HAWC is currently dominating in the higher dark matter mass range. The HAWC observatory is a water Cherenkov detector and consists of 300 Water Cherenkov Detectors (WCDs). The detector is located at 4100 m above sea level in the Sierra Negra region of Mexico at latitude 18°59'41" N and longitude 97°18'28" W. Each WCD is instrumented with three 8 inch photomultiplier tubes (PMTs) and one 10 inch high efficiency PMT, anchored to the bottom of a 5 m deep by 7.3 m diameter steel tank. The tank contains a multilayer hermetic plastic bag, called a bladder, which holds 200,000 L of ultra-purified water. I will also present the design, deployment, and operation of a WCD prototype for HAWC built at Colorado State University (CSU). The CSU WCD was the only full-size prototype outside of the HAWC site. It was instrumented with 7 HAWC PMTs and scintillator paddles both under and above the volume of water. In addition, the CSU WCD was equipped with the same laser calibration system that is deployed at the HAWC site, as well as the same electronics and data acquisition system. The WCD prototype served as a testbed for the different subsystems of the HAWC observatory. During the three different installations of the prototype, many aspects of the detector design and performance were tested including: tank construction, bladder installation and performance, PMT installation and performance, roof design, water filtration and filling, muon coincidence measurements and calibration system. The experience gained from the CSU prototype was invaluable to the overall design and installation of the HAWC detector.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilheux, Hassina Z; Bilheux, Jean-Christophe; Tremsin, Anton S
2015-01-01
The Oak Ridge National Laboratory (ORNL) Neutron Sciences Directorate (NScD) has installed a neutron imaging (NI) beam line at the High Flux Isotope Reactor (HFIR) cold guide hall. The CG-1D beam line produces cold neutrons for a broad range of user research spanning from engineering to material research, additive manufacturing, vehicle technologies, archaeology, biology, and plant physiology. Recent efforts have focused on increasing flux and spatial resolution. A series of selected engineering applications is presented here. Historically and for more than four decades, neutron imaging (NI) facilities have been installed exclusively at continuous (i.e. reactor-based) neutron sources rather than atmore » pulsed sources. This is mainly due to (1) the limited number of accelerator-based facilities and therefore the fierce competition for beam lines with neutron scattering instruments, (2) the limited flux available at accelerator-based neutron sources and finally, (3) the lack of high efficiency imaging detector technology capable of time-stamping pulsed neutrons with sufficient time resolution. Recently completed high flux pulsed proton-driven neutron sources such as the ORNL Spallation Neutron Source (SNS) at ORNL and the Japanese Spallation Neutron Source (JSNS) of the Japan Proton Accelerator Research Complex (J-PARC) in Japan produce high neutron fluxes that offer new and unique opportunities for NI techniques. Pulsed-based neutron imaging facilities RADEN and IMAT are currently being built at J-PARC and the Rutherford National Laboratory in the U.K., respectively. ORNL is building a pulsed neutron imaging beam line called VENUS to respond to the U.S. based scientific community. A team composed of engineers, scientists and designers has developed a conceptual design of the future VENUS imaging instrument at the SNS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koracin, D.; Kaplan, M.; Smith, C.
The main objectives of this project were to conduct a tall-tower and sodar field campaign in complex terrain, investigate wind properties relevant to wind energy assessment, and evaluate high-resolution models with fixed and adaptive grid structures. Two 60-m towers at Virginia Peak ridges near Washoe Valley, Nevada, were instrumented with cup and vane anemometers as well as sonic anemometers, and an acoustic sounder (hereafter sodar) was installed near one of the towers. The towers were located 2,700 m apart with a vertical distance of 140 m elevation between their bases. Each tower had a downhill exposure of rolling complex terrain,more » with the nearby valley floor 3,200 m to the west and 800 m below the summit. Cup anemometers were installed at both towers at 20, 40, and 60 m, wind vanes at 20 and 60 m, and sonic anemometers at 20 and 60 m. The sodar measurements were nominally provided every 10 m in vertical distance from 40 to 200 m with the quality of the data generally decreasing with height. Surface air temperature, atmospheric pressure, and radiation measurements were conducted at 1.5 m AGL at both of the towers. Although the plan was to conduct a 1-year period of data collection, we extended the period (October 5, 2012 through February 24, 2014) to cover for possible data loss from instrument or communication problems. We also present a preliminary analysis of the towers and sodar data, including a detailed inventory of available and missing data as well as outliers. The analysis additionally includes calculation of the Weibull parameters, turbulence intensity, and initial computation of wind power density at various heights.« less
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians look over the Science Instrument Command and Data Handling Unit, or SIC&DH. The SIC&DH will be installed on the Multi-Use Lightweight Equipment Carrier in the facility. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, the Science Instrument Command and Data Handling Unit, or SIC&DH, is moved toward the Multi-Use Lightweight Equipment Carrier in the background, where it will be installed. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
2009-04-02
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, the Science Instrument Command and Data Handling Unit, or SIC&DH, is moved toward the Multi-Use Lightweight Equipment Carrier in the background, where it will be installed. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis
1985-09-01
Strypi rocket, XM-33 ’"’" 22 1.3 Nike -Hercules missile 23 2.1 Staff organization, TU 8.1.3- 34 2.2 Control diagram, TU 8.1.3 2.3...DAMPshlp lf 6.3 General experimental plan, radar attenuation I69 6.4 Nike -Apache rockets with C-band beacon payloads - I™ 6.5 Shipboard antenna...Shot Star Fish 198 6.34 Blast instrument installation, Project 1.1 199 6.35 Accelerometer installation, Project 1.1 199 6.36 Nike -Cajun rocket
NASA Astrophysics Data System (ADS)
de Rossi, Giuseppe; Puccini, Massimo; Puccetti, Giuseppe
1995-12-01
The paper describes the environmental tests to be carried out on the scientific instrumentation to be flown on the M-55 Geophysika in the frame of the APE Program. The instruments, developed by different European research institutes, are for remote sensing and in situ measurements of the major components of the Earth's stratosphere. The paper presents the technological activities that ENEA (Ente Nazionale per le Nuove Tecnologie l'Energia e l'Ambiente) is carrying out in its laboratories to verify the correspondence of the various instruments to meet the requirements for airborne application. The reference documents used have been the RTCA/DO-160C and the MDB (Myasishchev Design Bureau) specifications.
Ionospheric Observations During a Geomagnetic Storm from LITES on the ISS
NASA Astrophysics Data System (ADS)
Finn, S. C.; Stephan, A. W.; Cook, T.; Budzien, S. A.; Chakrabarti, S.; Erickson, P. J.; Geddes, G.
2017-12-01
The Limb-Imaging Ionospheric and Thermospheric Extreme-Ultraviolet Spectrograph (LITES) is an extreme-ultraviolet imaging spectrograph that launched in February 2017 and was installed on the International Space Station (ISS). LITES is limb-viewing ( 150 - 350 km tangent altitude) and measures airglow emissions from 60 - 140 nm with 0.2° angular and 1 nm spectral resolutions. We present early LITES results of observations during a G2 geomagnetic storm in April 2017. In addition to LITES data, we will show complementary ground-based incoherent scatter radar (ISR) observations from Millstone Hill during this storm. The combination of LITES EUV space-based observations with the ground-based radio data is an example of the capability of campaign-style measurements of the ionosphere-thermosphere system using multiwavelength ground- and space-based instruments.
Developments in analytical instrumentation
NASA Astrophysics Data System (ADS)
Petrie, G.
The situation regarding photogrammetric instrumentation has changed quite dramatically over the last 2 or 3 years with the withdrawal of most analogue stereo-plotting machines from the market place and their replacement by analytically based instrumentation. While there have been few new developments in the field of comparators, there has been an explosive development in the area of small, relatively inexpensive analytical stereo-plotters based on the use of microcomputers. In particular, a number of new instruments have been introduced by manufacturers who mostly have not been associated previously with photogrammetry. Several innovative concepts have been introduced in these small but capable instruments, many of which are aimed at specialised applications, e.g. in close-range photogrammetry (using small-format cameras); for thematic mapping (by organisations engaged in environmental monitoring or resources exploitation); for map revision, etc. Another innovative and possibly significant development has been the production of conversion kits to convert suitable analogue stereo-plotting machines such as the Topocart, PG-2 and B-8 into fully fledged analytical plotters. The larger and more sophisticated analytical stereo-plotters are mostly being produced by the traditional mainstream photogrammetric systems suppliers with several new instruments and developments being introduced at the top end of the market. These include the use of enlarged photo stages to handle images up to 25 × 50 cm format; the complete integration of graphics workstations into the analytical plotter design; the introduction of graphics superimposition and stereo-superimposition; the addition of correlators for the automatic measurement of height, etc. The software associated with this new analytical instrumentation is now undergoing extensive re-development with the need to supply photogrammetric data as input to the more sophisticated G.I.S. systems now being installed by clients, instead of the data being used mostly in the digital mapping systems operated in-house by mapping organisations. These various new hardware and software developments are reported upon and analysed in this Invited Paper presented to ISPRS Commission II at the 1988 Kyoto Congress.
Weather Sensors from Spain on Mars Rover Curiosity
2010-11-30
Sensors on two finger-like mini-booms extending horizontally from the mast of NASA Mars rover Curiosity will monitor wind speed, wind direction and air temperature; image taken during installation of the instrument inside a clean room at NASA JPL.
14 CFR 23.1321 - Arrangement and visibility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 23.1321 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT...: Installation § 23.1321 Arrangement and visibility. (a) Each flight, navigation, and powerplant instrument for... most effectively indicates direction of flight, other than the magnetic direction indicator required by...
Mars2020 Entry, Descent, and Landing Instrumentation 2 (MEDLI2) Do No Harm Test Series
NASA Technical Reports Server (NTRS)
Swanson, Gregory; Santos, Jose; White, Todd; Bruce, Walt; Kuhl, Chris; Wright, Henry
2017-01-01
A total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer are planned to be utilized on the Mars 2020 missions thermal protection system (TPS) as part of the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) project. Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020s predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12 by 12 test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuumcycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation.This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.
Differential speckle and wide-field imaging for the Gemini-North and WIYN telescopes
NASA Astrophysics Data System (ADS)
Scott, Nicholas J.; Howell, Steve B.; Horch, Elliott P.
2016-07-01
Two new instruments are currently being built for the Gemini-North and WIYN telescopes. They are based on the existing DSSI (Differential Speckle Survey Instrument), but the new dual-channel instruments will have both speckle and "wide-field" imaging capabilities. Nearly identical copies of the instrument will be installed as a public access permanent loan at the Gemini-N and WIYN telescopes. Many exoplanet targets will come from the NASA K2 and TESS missions. The faint limiting magnitude, for speckle observations, will remain around 16 to 17th magnitude depending on observing conditions, while wide-field, high speed imaging should be able to go to 21+. For Gemini, the instrument will be remotely operable from either the mid-level facility at Hale Pohaku or the remote operations base in Hilo.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fishbaugher, M. J.
1985-05-01
The decreasing cost of microcomputers along with improvements in power metering circuitry have changed the way in which electrical energy use is monitored. Although utilities still rely on kilowatt-hour (kWh) meters for billing purposes, a microcomputer-based monitoring system is used when greater temporal and end-use resolution is desired. Because these types of monitoring systems will be used increasingly in large-scale conservation and end-use studies, it is important that their performance be analyzed to determine their accuracy. A co-instrumentation test was devised in which two such microcomputer-based monitoring systems made simultaneous measurements of electrical end-uses in two commercial buildings. The analysismore » of the co-instrumentation data aids in the evaluation of microcomputer-based monitoring systems used for end-use measurements. Separate and independent data loggers were used to measure the same loads simultaneously. In addition to these two systems, a utility billing meter measured the total energy use in each building during the co-instrumentation test. The utility's meters provided a relatively accurate standard by which the performance of both loggers could be judged. The comparison between the SCL and PNL microcomputer-based loggers has shown that power measurement techniques directly affect system performance. The co-instrumentation test has shown that there are certain standards that a monitoring system must meet if it is to perform well. First, it is essential to calibrate a microcomputer-based logger against a known standard load before the system is installed. Second, a microcomputer-based system must have some way of accounting for power factors. Recent advances in power metering circuitry have made it relatively easy to apply these power factors automatically in real time.« less
NASA Astrophysics Data System (ADS)
Rauschenbach, I.; Jessberger, E. K.; Pavlov, S. G.; Hübers, H.-W.
2010-08-01
We report on our ongoing studies to develop Laser-Induced Breakdown Spectroscopy (LIBS) for planetary surface missions to Mars and other planets and moons, like Jupiter's moon Europa or the Earth's moon. Since instruments for space missions are severely mass restricted, we are developing a light-weight miniaturized close-up LIBS instrument to be installed on a lander or rover for the in-situ geochemical analysis of planetary surface rocks and coarse fines. The total mass of the instrument will be ≈ 1 kg in flight configuration. Here we report on a systematic performance study of a LIBS instrument equipped with a prototype laser of 216 g total mass and an energy of 1.8 mJ. The LIBS measurements with the prototype laser and the comparative measurements with a regular 40 mJ laboratory laser were both performed under Martian atmospheric conditions. We calibrated 14 major and minor elements by analyzing 18 natural samples of certified composition. The calibration curves define the limits of detection that are > 5 ppm for the lab laser and > 400 ppm for the prototype laser, reflecting the different analyzed sample masses of ≈ 20 µg and ≈ 2 µg, respectively. To test the accuracy we compared the LIBS compositions, determined with both lasers, of Mars analogue rocks with certified or independently measured compositions and found agreements typically within 10-20%. In addition we verified that dust coverage is effectively removed from rock surfaces by the laser blast. Our study clearly demonstrates that a close-up LIBS instrument (spot size ≈ 50 µm) will decisively enhance the scientific output of planetary lander missions by providing a very large number of microscopic elemental analyses.
Johnson, Arielle J.; Hirson, Gregory D.; Ebeler, Susan E.
2012-01-01
This paper describes the design of a new instrumental technique, Gas Chromatography Recomposition-Olfactometry (GC-R), that adapts the reconstitution technique used in flavor chemistry studies by extracting volatiles from a sample by headspace solid-phase microextraction (SPME), separating the extract on a capillary GC column, and recombining individual compounds selectively as they elute off of the column into a mixture for sensory analysis (Figure 1). Using the chromatogram of a mixture as a map, the GC-R instrument allows the operator to “cut apart" and recombine the components of the mixture at will, selecting compounds, peaks, or sections based on retention time to include or exclude in a reconstitution for sensory analysis. Selective recombination is accomplished with the installation of a Deans Switch directly in-line with the column, which directs compounds either to waste or to a cryotrap at the operator's discretion. This enables the creation of, for example, aroma reconstitutions incorporating all of the volatiles in a sample, including instrumentally undetectable compounds as well those present at concentrations below sensory thresholds, thus correcting for the “reconstitution discrepancy" sometimes noted in flavor chemistry studies. Using only flowering lavender (Lavandula angustifola ‘Hidcote Blue’) as a source for volatiles, we used the instrument to build mixtures of subsets of lavender volatiles in-instrument and characterized their aroma qualities with a sensory panel. We showed evidence of additive, masking, and synergistic effects in these mixtures and of “lavender' aroma character as an emergent property of specific mixtures. This was accomplished without the need for chemical standards, reductive aroma models, or calculation of Odor Activity Values, and is broadly applicable to any aroma or flavor. PMID:22912722
Johnson, Arielle J; Hirson, Gregory D; Ebeler, Susan E
2012-01-01
This paper describes the design of a new instrumental technique, Gas Chromatography Recomposition-Olfactometry (GC-R), that adapts the reconstitution technique used in flavor chemistry studies by extracting volatiles from a sample by headspace solid-phase microextraction (SPME), separating the extract on a capillary GC column, and recombining individual compounds selectively as they elute off of the column into a mixture for sensory analysis (Figure 1). Using the chromatogram of a mixture as a map, the GC-R instrument allows the operator to "cut apart" and recombine the components of the mixture at will, selecting compounds, peaks, or sections based on retention time to include or exclude in a reconstitution for sensory analysis. Selective recombination is accomplished with the installation of a Deans Switch directly in-line with the column, which directs compounds either to waste or to a cryotrap at the operator's discretion. This enables the creation of, for example, aroma reconstitutions incorporating all of the volatiles in a sample, including instrumentally undetectable compounds as well those present at concentrations below sensory thresholds, thus correcting for the "reconstitution discrepancy" sometimes noted in flavor chemistry studies. Using only flowering lavender (Lavandula angustifola 'Hidcote Blue') as a source for volatiles, we used the instrument to build mixtures of subsets of lavender volatiles in-instrument and characterized their aroma qualities with a sensory panel. We showed evidence of additive, masking, and synergistic effects in these mixtures and of "lavender' aroma character as an emergent property of specific mixtures. This was accomplished without the need for chemical standards, reductive aroma models, or calculation of Odor Activity Values, and is broadly applicable to any aroma or flavor.
Astrobo: Towards a new observatory control system for the Garching Observatory 0.6m
NASA Astrophysics Data System (ADS)
Schweyer, T.; Jarmatz, P.; Burwitz, V.
2016-12-01
The recently installed Campus Observatory Garching (COG) 0.6m telescope features a wide array of instruments, including a wide-field imager and a variety of spectrographs. To support all these different instruments and improve time usage, it was decided to develop a new control system from scratch, that will be able to safely observe autonomously as well as manually (for student lab courses). It is built using an hierarchical microservice architecture, which allows well-specified communication between its components regardless of the programming language used. This modular design allows for fast prototyping of components as well as easy implementation of complex instrumentation control software.
NASA Astrophysics Data System (ADS)
Calloway, Raymond S.; Knight, Vernie H., Jr.
NASA Langley's Crash Response Data System (CRDS) which is designed to acquire aircraft structural and anthropomorphic dummy responses during the full-scale transport CID test is described. Included in the discussion are the system design approach, details on key instrumentation subsystems and operations, overall instrumentation crash performance, and data recovery results. Two autonomous high-environment digital flight instrumentation systems, DAS 1 and DAS 2, were employed to obtain research data from various strain gage, accelerometer, and tensiometric sensors installed in the B-720 test aircraft. The CRDS successfully acquired 343 out of 352 measurements of dynamic crash data.
Code of Federal Regulations, 2014 CFR
2014-07-01
... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...
NASA Astrophysics Data System (ADS)
Dolan, Matthew Philip
The objective of this research has been to analyze the steady state performance of a new centrifugal compressor research facility. The CSTAR (Centrifugal STage for Aerodynamic Research) compressor has been designed to be placed as the last stage in an axial compressor and its performance in this flow regime was measured. Because the compressor was designed as a research vehicle, unique instrumentation throughout the flow path provides a detailed look at its steady state performance. Rakes at the inlet and deswirl section quantify the overall performance but other instrumentation is used to understand the component performance. Static pressure taps along the shroud, within the diffuser, and through the turn-to-axial show the static pressure rise. Additionally, rakes at the inlet and exit of diffuser also characterize the performance of the wedge diffuser and the impeller. Additionally, capacitance probes located at the knee and exducer of the impeller non-intrusively measure the size of the tip clearance during facility operation. An investigation into these measurements resulted in a standard procedure for in-situ calibration and installation to produce repeatable and accurate clearance measurements. Finally, the feasibility of future Laser Doppler Velocimetry measurements acquired through the shroud window was tested and was found to be achievable with the use of beam translators to ensure that measurement volumes are created after beam refraction through the windows. Inlet conditions of the facility have been investigated and fluctuations of the ambient conditions have been mitigated with a large settling chamber to ensure repeatable and stable operation. The current instrumentation was utilized to determine the compressor performance. Measurements of the steady performance parameters along with those of the internal flowfield are documented.
NASA Astrophysics Data System (ADS)
Warren, K.; Eppes, M.-C.; Swami, S.; Garbini, J.; Putkonen, J.
2013-11-01
The rates and processes that lead to non-tectonic rock fracture on Earth's surface are widely debated but poorly understood. Few, if any, studies have made the direct observations of rock fracturing under natural conditions that are necessary to directly address this problem. An instrumentation design that enables concurrent high spatial and temporal monitoring resolution of (1) diurnal environmental conditions of a natural boulder and its surroundings in addition to (2) the fracturing of that boulder under natural full-sun exposure is described herein. The surface of a fluvially transported granite boulder was instrumented with (1) six acoustic emission (AE) sensors that record micro-crack associated, elastic wave-generated activity within the three-dimensional space of the boulder, (2) eight rectangular rosette foil strain gages to measure surface strain, (3) eight thermocouples to measure surface temperature, and (4) one surface moisture sensor. Additionally, a soil moisture probe and a full weather station that measures ambient temperature, relative humidity, wind speed, wind direction, barometric pressure, insolation, and precipitation were installed adjacent to the test boulder. AE activity was continuously monitored by one logger while all other variables were acquired by a separate logger every 60 s. The protocols associated with the instrumentation, data acquisition, and analysis are discussed in detail. During the first four months, the deployed boulder experienced almost 12 000 AE events, the majority of which occur in the afternoon when temperatures are decreasing. This paper presents preliminary data that illustrates data validity and typical patterns and behaviors observed. This system offers the potential to (1) obtain an unprecedented record of the natural conditions under which rocks fracture and (2) decipher the mechanical processes that lead to rock fracture at a variety of temporal scales under a range of natural conditions.
NASA Astrophysics Data System (ADS)
Warren, K.; Eppes, M.-C.; Swami, S.; Garbini, J.; Putkonen, J.
2013-07-01
The rates and processes that lead to non-tectonic rock fracture on the Earth's surface are widely debated but poorly understood. Few, if any, studies have made the direct observations of rock fracturing under natural conditions that are necessary to directly address this problem. An instrumentation design that enables concurrent high spatial and temporal monitoring resolution of (1) diurnal environmental conditions of a natural boulder and its surroundings in addition to (2) the fracturing of that boulder under natural full-sun exposure is described herein. The surface of a fluvially transported granite boulder was instrumented with (1) six acoustic emission (AE) sensors that record micro-crack associated, elastic wave-generated activity within the three-dimensional space of the boulder, (2) eight rectangular rosette foil strain gages to measure surface strain, (3) eight thermocouples to measure surface temperature, and (4) one surface moisture sensor. Additionally, a soil moisture probe and a full weather station that measures ambient temperature, relative humidity, wind speed, wind direction, barometric pressure, insolation, and precipitation were installed adjacent to the test boulder. AE activity was continuously monitored by one logger while all other variables were acquired by a separate logger every 60 s. The protocols associated with the instrumentation, data acquisition, and analyses are discussed in detail. During the first four months, the deployed boulder experienced almost 12 000 AE events, the majority of which occur in the afternoon when temperatures are decreasing. This paper presents preliminary data that illustrates data validity and typical patterns and behaviors observed. This system offers the potential to (1) obtain an unprecedented record of the natural conditions under which rocks fracture and (2) decipher the mechanical processes that lead to rock fracture at a variety of temporal scales under a range of natural conditions.
Long term measurement network for FIFE
NASA Technical Reports Server (NTRS)
Blad, Blaine L.; Walter-Shea, Elizabeth A.; Hays, Cynthia J.
1988-01-01
The objectives were: to obtain selected instruments which were not standard equipment on the Portable Automated Mesometeorological (PAM) and Data Control Platform (DCP) stations; to assist in incorporation of these instruments onto the PAM and DCP stations; to help provide routine maintenance of the instruments; to conduct periodic instrument calibrations; and to repair or replace malfunctioning instruments when possible. All of the objectives were or will be met soon. All instruments and the necessary instrument stands were purchased or made and were available for inclusion on the PAM and DCP stations before the beginning of the IFC-1. Due to problems beyond control, the DCP stations experienced considerable difficulty in becoming operational. To fill some of the gaps caused by the DCP problems, Campbell CR21-X data loggers were installed and the data collected on cassette tapes. Periodic checks of all instruments were made, to maintain data quality, to make necessary adjustments in certain instruments, to replace malfunctioning instruments, and to provide instrument calibration. All instruments will be calibrated before the beginning of the 1988 growing season as soon as the weather permits access to all stations and provides conditions that are not too harsh to work in for extended periods of time.
Hopkins during SODI-DCMIX 2 Experiment
2013-11-30
ISS038-E-009255 (26 Nov. 2013) --- In the International Space Station?s Destiny laboratory, NASA astronaut Michael Hopkins, Expedition 38 flight engineer, prepares to install and activate the Selectable Optics Diagnostic Instrument (SODI) cell array two in the Microgravity Science Glovebox (MSG) for the Selectable Optics Diagnostic Instrument-Diffusion Coefficient in Mixtures 2 (SODI-DCMIX 2) experiment. SODI-DCMIX 2 is supporting research to determine diffusion coefficients in different petroleum field samples and refine petroleum reservoir models to help lead to more efficient extraction of oil resources.
Hopkins during SODI-DCMIX 2 Experiment
2013-11-30
ISS038-E-009253 (26 Nov. 2013) --- In the International Space Station’s Destiny laboratory, NASA astronaut Michael Hopkins, Expedition 38 flight engineer, prepares to install and activate the Selectable Optics Diagnostic Instrument (SODI) cell array two in the Microgravity Science Glovebox (MSG) for the Selectable Optics Diagnostic Instrument-Diffusion Coefficient in Mixtures 2 (SODI-DCMIX 2) experiment. SODI-DCMIX 2 is supporting research to determine diffusion coefficients in different petroleum field samples and refine petroleum reservoir models to help lead to more efficient extraction of oil resources.
NUCLEON Satellite Mission. Status and Plans
NASA Technical Reports Server (NTRS)
Bashindzhagyan, G.; Adams, J.; Bashindzhagyan, P.; Baranova, N.; Christl, M.; Chilingarian, A.; Chupin, I.; Derrickson, J.; Drury, L.; Egorov, N.
2003-01-01
The main objective of the NUCLEON satellite mission is direct measurements of the elemental energy spectra of high-energy (10(exp 11) - 10(exp 15) eV) cosmic rays with Kinematic Lightweight Energy Meter (KLEM) device. The design of the instrument has been corrected to increase geometry factor and improve charge resolution. The special mechanical and electronic systems have been developed for installation of the experimental apparatus in a regular Russian satellite. It is planned to launch the NUCLEON instrument in 2006.
Can Wing Tip Vortices Be Accurately Simulated?
2011-07-01
additional tail buffeting.2 In commercial applications, winglets have been installed on passenger aircraft to minimize vortex formation and reduce lift...towed vehicles and cause additional tail buffeting (Ref 2). In commercial applications, winglets have been installed on passenger aircraft to
2015-10-01
Clip Additively Manufactured • The Navy installed a 3D printer aboard the USS Essex to demonstrate the ability to additively develop and produce...desired result and vision to have the capability on the fleet. These officials stated that the Navy plans to install 3D printers on two additional...DEFENSE ADDITIVE MANUFACTURING DOD Needs to Systematically Track Department-wide 3D Printing Efforts Report to
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (j) Fair market value. The price at which a property will sell in the open market allowing a... or instrumentality thereof. (q) Public facilities. Installations open to the public and used for the... areas, sewer plants, water plants, community centers, libraries, city or town halls, jailhouses...
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (j) Fair market value. The price at which a property will sell in the open market allowing a... or instrumentality thereof. (q) Public facilities. Installations open to the public and used for the... areas, sewer plants, water plants, community centers, libraries, city or town halls, jailhouses...
NOAA: Primary GOES-R instrument cleared for installation onto spacecraft
: NOAA-NASA GOES-R Program Office) In early 2014 the ABI will be shipped from its developer, Exelis, in performance of power grids. NOAA manages the GOES-R Series program through an integrated NOAA-NASA office
DOT National Transportation Integrated Search
2013-12-01
Monitoring installation of driven pile foundations : is critically important to ensure adequate safety : of structures with piles, such as the many bridges : which are maintained by the Florida Department : of Transportation (FDOT). Dynamic load test...
Monitoring of the permeable pavement demonstration site at Edison Environmental Center
The EPA’s Urban Watershed Management Branch has installed an instrumented, working full-scale 110-space pervious pavement parking lot and has been monitoring several environmental stressors and runoff. This parking lot demonstration site has allowed the investigation of differenc...
75 FR 16676 - Airworthiness Standards; Electrical and Electronic System Lightning Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... systems that allow them to operate into instrument meteorological conditions (IMC), where lightning... 27 standards that operate in VFR-only operations with electrical or electronic systems installed for... Airworthiness Standards; Electrical and Electronic System Lightning Protection AGENCY: Federal Aviation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yan, Jing; Zhou, Mowei; Gilbert, Joshua D.
Mass spectrometry continues to develop as a valuable tool in the analysis of proteins and protein complexes. In protein complex mass spectrometry studies, surface-induced dissociation (SID) has been successfully applied in quadrupole time-of-flight (Q-TOF) instruments. SID provides structural information on noncovalent protein complexes that is complementary to other techniques. However, the mass resolution of Q-TOF instruments can limit the information that can be obtained for protein complexes by SID. Fourier transform ion cyclotron resonance mass spectrometry (FT-ICR MS) provides ultrahigh resolution and ultrahigh mass accuracy measurements. Here in this study, an SID device was designed and successfully installed in amore » hybrid FT-ICR instrument in place of the standard gas collision cell. The SID-FT-ICR platform has been tested with several protein complex systems (homooligomers, a heterooligomer, and a protein-ligand complex, ranging from 53 to 85 kDa), and the results are consistent with data previously acquired on Q-TOF platforms, matching predictions from known protein interface information. Lastly, SID fragments with the same m/z but different charge states are well-resolved based on distinct spacing between adjacent isotope peaks, and the addition of metal cations and ligands can also be isotopically resolved with the ultrahigh mass resolution available in FT-ICR.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yan, Jing; Zhou, Mowei; Gilbert, Joshua D.
Mass spectrometry continues to develop as a valuable tool in the analysis of proteins and protein complexes. In protein complex mass spectrometry studies, surface-induced dissociation (SID) has been successfully applied in quadrupole time-of-flight (Q-TOF) instruments. SID provides structural information on non-covalent protein complexes that is complementary to other techniques. However, the mass resolution of Q-TOF instruments can limit the information that can be obtained for protein complexes by SID. Fourier transform ion cyclotron resonance mass spectrometry (FT-ICR MS) provides ultrahigh resolution and ultrahigh mass accuracy measurements. In this study, an SID device was designed and successfully installed in a hybridmore » FT-ICR instrument in place of the standard gas collision cell. The SID-FT-ICR platform has been tested with several protein complex systems (homooligomers, a heterooligomer, and a protein-ligand complex, ranging from 53 kDa to 85 kDa), and the results are consistent with data previously acquired on Q-TOF platforms, matching predictions from known protein interface information. SID fragments with the same m/z but different charge states are well-resolved based on distinct spacing between adjacent isotope peaks, and the addition of metal cations and ligands can also be isotopically resolved with the ultrahigh mass resolution available in FT-ICR.« less
Yan, Jing; Zhou, Mowei; Gilbert, Joshua D.; ...
2016-12-02
Mass spectrometry continues to develop as a valuable tool in the analysis of proteins and protein complexes. In protein complex mass spectrometry studies, surface-induced dissociation (SID) has been successfully applied in quadrupole time-of-flight (Q-TOF) instruments. SID provides structural information on noncovalent protein complexes that is complementary to other techniques. However, the mass resolution of Q-TOF instruments can limit the information that can be obtained for protein complexes by SID. Fourier transform ion cyclotron resonance mass spectrometry (FT-ICR MS) provides ultrahigh resolution and ultrahigh mass accuracy measurements. Here in this study, an SID device was designed and successfully installed in amore » hybrid FT-ICR instrument in place of the standard gas collision cell. The SID-FT-ICR platform has been tested with several protein complex systems (homooligomers, a heterooligomer, and a protein-ligand complex, ranging from 53 to 85 kDa), and the results are consistent with data previously acquired on Q-TOF platforms, matching predictions from known protein interface information. Lastly, SID fragments with the same m/z but different charge states are well-resolved based on distinct spacing between adjacent isotope peaks, and the addition of metal cations and ligands can also be isotopically resolved with the ultrahigh mass resolution available in FT-ICR.« less
Subsidence monitoring with geotechnical instruments in the Mexicali Valley, Baja California, Mexico
NASA Astrophysics Data System (ADS)
Glowacka, E.; Sarychikhina, O.; Márquez Ramírez, V. H.; Robles, B.; Nava, F. A.; Farfán, F.; García Arthur, M. A.
2015-11-01
The Mexicali Valley (northwestern Mexico), situated in the southern part of the San Andreas fault system, is an area with high tectonic deformation, recent volcanism, and active seismicity. Since 1973, fluid extraction, from the 1500-3000 m depth range, at the Cerro Prieto Geothermal Field (CPGF), has influenced deformation in the Mexicali Valley area, accelerating the subsidence and causing slip along the traces of tectonic faults that limit the subsidence area. Detailed field mapping done since 1989 (González et al., 1998; Glowacka et al., 2005; Suárez-Vidal et al., 2008) in the vicinity of the CPGF shows that many subsidence induced fractures, fissures, collapse features, small grabens, and fresh scarps are related to the known tectonic faults. Subsidence and fault rupture are causing damage to infrastructure, such as roads, railroad tracks, irrigation channels, and agricultural fields. Since 1996, geotechnical instruments installed by CICESE (Centro de Investigación Ciéntifica y de Educación Superior de Ensenada, B.C.) have operated in the Mexicali Valley, for continuous recording of deformation phenomena. Instruments are installed over or very close to the affected faults. To date, the network includes four crackmeters and eight tiltmeters; all instruments have sampling intervals in the 1 to 20 min range. Instrumental records typically show continuous creep, episodic slip events related mainly to the subsidence process, and coseismic slip discontinuities (Glowacka et al., 1999, 2005, 2010; Sarychikhina et al., 2015). The area has also been monitored by levelling surveys every few years and, since the 1990's by studies based on DInSAR data (Carnec and Fabriol, 1999; Hansen, 2001; Sarychikhina et al., 2011). In this work we use data from levelling, DInSAR, and geotechnical instruments records to compare the subsidence caused by anthropogenic activity and/or seismicity with slip recorded by geotechnical instruments, in an attempt to obtain more information about the process of fault slip associated with subsidence.
Fogleman, Kent A.; Lahr, John C.; Stephens, Christopher D.; Page, Robert A.
1993-01-01
This report describes the instrumentation and evolution of the U.S. Geological Survey’s regional seismograph network in southern Alaska, provides phase and hypocenter data for seismic events from October 1971 through May 1989, reviews the location methods used, and discusses the completeness of the catalog and the accuracy of the computed hypocenters. Included are arrival time data for explosions detonated under the Trans-Alaska Crustal Transect (TACT) in 1984 and 1985.The U.S. Geological Survey (USGS) operated a regional network of seismographs in southern Alaska from 1971 to the mid 1990s. The principal purpose of this network was to record seismic data to be used to precisely locate earthquakes in the seismic zones of southern Alaska, delineate seismically active faults, assess seismic risks, document potential premonitory earthquake phenomena, investigate current tectonic deformation, and study the structure and physical properties of the crust and upper mantle. A task fundamental to all of these goals was the routine cataloging of parameters for earthquakes located within and adjacent to the seismograph network.The initial network of 10 stations, 7 around Cook Inlet and 3 near Valdez, was installed in 1971. In subsequent summers additions or modifications to the network were made. By the fall of 1973, 26 stations extended from western Cook Inlet to eastern Prince William Sound, and 4 stations were located to the east between Cordova and Yakutat. A year later 20 additional stations were installed. Thirteen of these were placed along the eastern Gulf of Alaska with support from the National Oceanic and Atmospheric Administration (NOAA) under the Outer Continental Shelf Environmental Assessment Program to investigate the seismicity of the outer continental shelf, a region of interest for oil exploration. Since then the region covered by the network remained relatively fixed while efforts were made to make the stations more reliable through improved electronic instrumentation and strengthened antenna systems. The majority of the stations installed since 1980 were operated only temporarily (from one to several years) for special studies in various areas within the network. Due to reduced funding, the network was trimmed substantially in the summer of 1985 with the closure of 15 stations, 13 of which were located in and around the Yakataga seismic gap. To further reduce costs, two telephone circuits were dropped and multiple radio relays were installed in their place. This economy reduced the reliability of these telemetry links. In addition, data collection from the areas around Cordova and Yakutat was compromised by the necessity of relying on triggered event recording using PC-based systems (Rogers, 1993) that were not fully developed and which proved to be less reliable than anticipated.The principal means of recording throughout the time period of this catalog was 20-channel oscillographs on 16-mm film (Teledyne Geotech Develocorder, Model RF400 and 4000D). Initially one Develocorder was operated at the USGS Alaskan headquarters in Anchorage, but in 1972 recording was shifted to the National Oceanic and Atmospheric Administration (NOAA) Palmer Observatory (currently the West Coast and Alaska Tsunami Warning Center). The Develocorders were turned off at the end of May 1989, and after that time recording was done in digital format at the Geophysical Institute of the University of Alaska in Fairbanks (GIUA). Thus, this catalog covers the entire period of film recording.
Status of the DKIST system for solar adaptive optics
NASA Astrophysics Data System (ADS)
Johnson, Luke C.; Cummings, Keith; Drobilek, Mark; Johansson, Erik; Marino, Jose; Richards, Kit; Rimmele, Thomas; Sekulic, Predrag; Wöger, Friedrich
2016-07-01
When the Daniel K. Inouye Solar Telescope (DKIST) achieves first light in 2019, it will deliver the highest spatial resolution images of the solar atmosphere ever recorded. Additionally, the DKIST will observe the Sun with unprecedented polarimetric sensitivity and spectral resolution, spurring a leap forward in our understanding of the physical processes occurring on the Sun. The DKIST wavefront correction system will provide active alignment control and jitter compensation for all six of the DKIST science instruments. Five of the instruments will also be fed by a conventional adaptive optics (AO) system, which corrects for high frequency jitter and atmospheric wavefront disturbances. The AO system is built around an extended-source correlating Shack-Hartmann wavefront sensor, a Physik Instrumente fast tip-tilt mirror (FTTM) and a Xinetics 1600-actuator deformable mirror (DM), which are controlled by an FPGA-based real-time system running at 1975 Hz. It is designed to achieve on-axis Strehl of 0.3 at 500 nm in median seeing (r0 = 7 cm) and Strehl of 0.6 at 630 nm in excellent seeing (r0 = 20 cm). The DKIST wavefront correction team has completed the design phase and is well into the fabrication phase. The FTTM and DM have both been delivered to the DKIST laboratory in Boulder, CO. The real-time controller has been completed and is able to read out the camera and deliver commands to the DM with a total latency of approximately 750 μs. All optics and optomechanics, including many high-precision custom optics, mounts, and stages, are completed or nearing the end of the fabrication process and will soon undergo rigorous acceptance testing. Before installing the wavefront correction system at the telescope, it will be assembled as a testbed in the laboratory. In the lab, performance tests beginning with component-level testing and continuing to full system testing will ensure that the wavefront correction system meets all performance requirements. Further work in the lab will focus on fine-tuning our alignment and calibration procedures so that installation and alignment on the summit will proceed as efficiently as possible.
NASA Astrophysics Data System (ADS)
Tran, S.; Mariani, Z.; Conway, S. A.; Lutsch, E.; Rowe, P. M.; Kasai, Y.; Strong, K.
2015-12-01
The High Arctic experiences prolonged periods of total darkness in the winter and continuous daylight in the summer, influencing the atmosphere and its composition in ways that are still not fully understood. Making atmospheric measurements in this remote region is challenging, particularly during polar night when solar-viewing instruments are not operational. By using infrared emission spectroscopy, which is independent of sunlight, we are able to document year-round the total column abundances of carbon monoxide (CO), methane (CH4), nitrous oxide (N2O), and ozone (O3). Measurements made at two Arctic sites are presented in this study: the Polar Environment Atmospheric Research Laboratory (PEARL, Eureka, Nunavut, Canada, 80.05°N, 86.42°W) and the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) facility on the North Slope of Alaska (NSA, Barrow, Alaska, 71.19°N, 156.36°W). At both sites, Extended-range Atmospheric Emitted Radiance Interferometers (E-AERIs), are used to measure the absolute downwelling infrared emission from the atmosphere between 400 and 3000 cm-1. The E-AERI has a moderate resolution of 1 cm-1 and provides information about trace gases columns with high sensitivity to the lower troposphere. At PEARL, the instrument was installed in October 2008. In addition, a similar instrument, the University of Idaho's Polar AERI (P-AERI) was installed at PEARL from March 2006 to June 2009. At NSA, the E-AERI has been operating since February 1998. Total columns of CO, CH4, N2O and O3 have been retrieved from 2006 to 2015 at PEARL and from 1998 to 2014 at NSA using the SFIT4 algorithm. These two datasets will be compared along with measurements made by high-resolution solar-viewing infrared spectrometers located at PEARL and at Poker Flat, Alaska (65.12°N, 147.47°W) to validate our results. These measurements will be used to present the annual, seasonal and diurnal variabilities of trace gases in the high Arctic at two different sites.
Photovoltaic balance-of-system designs and costs at PVUSA
NASA Astrophysics Data System (ADS)
Reyes, A. B.; Jennings, C.
1995-05-01
This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.
Participation of HNO3 CIMS Instrument in the Sage III Ozone Loss and Validation Experiment (SOLVE)
NASA Technical Reports Server (NTRS)
Eisele, F. L.
2001-01-01
This project was part of a larger SOLVE project led by Paul Wennberg at California Institute of Technology. The work completed on this project included participating in the installation and preflight testing of a new chemical ionization mass spectrometer for measuring gas and particle phase nitric acid on the ER-2. The investigators subsequently participated in SOLVE where additional instrument improvements were made and a substantial data set was generated. The two Georgia Tech investigators that participated in this work (Fred Eisele and Dave Tanner) had previously been responsible for much of the design and construction of the ion source and mass spectrometer which would be used to measure HNO3 in SOLVE, with Caltech focusing on inlets, calibration, gas supplies/pumping computer control, and overall integration. Thus, a similar focus remained during the SOLVE measurements though all investigators worked on most if not all aspects of the instrument at some point in the mission. Some of the more interesting results from the study included measurements of nitric acid on what are thought to be 5-20 microns diameter individual particles which could supply a local mechanism for HNO3 removal, Nitric acid measurements on SOLVE were completed as a collaborative effort with a great deal of overlap between this project and the larger parent project led by Paul Wennberg. As such, the instrumentation used, its operation, and the resulting measurements are far more fully discussed in the attached report (appendix A) which describes the joint SOLVE nitric acid measurement effort.
Korean standard nuclear plant ex-vessel neutron dosimetry program Ulchin 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duo, J.I.; Chen, J.; Kulesza, J.A.
2011-07-01
A comprehensive ex-vessel neutron dosimetry (EVND) surveillance program has been deployed in 16 pressurized water reactors (PWR) in South Korea and EVND dosimetry sets have already been installed and analyzed in Westinghouse reactor designs. In this paper, the unique features of the design, training, and installation in the Korean standard nuclear plant (KSNP) Ulchin Unit 4 are presented. Ulchin Unit 4 Cycle 9 represents the first dosimetry analyzed from the EVND design deployed in KSNP plants: Yonggwang Units 3 through 6 and Ulchin Units 3 through 6. KSNP's cavity configuration precludes a conventional installation from the cavity floor. The solution,more » requiring the installation crew to access the cavity at an elevation of the active core, places a premium on rapid installation due to high area dose rates. Numerous geometrical features warranted the use of a detailed design in true 3D mechanical design software to control interferences. A full-size training mockup maximized the crew ability to correctly install the instrument in minimum time. The analysis of the first dosimetry set shows good agreements between measurement and calculation within the associated uncertainties. A complete EVND system has been successfully designed, installed, and analyzed for a KNSP plant. Current and future EVND analyses will continue supporting the successful operation of PWR units in South Korea. (authors)« less
The space telescope scientific instruments
NASA Technical Reports Server (NTRS)
Leckrone, D. S.
1980-01-01
The paper describes the space telescope with a 2.4 m aperture to be launched at 500 km altitude in late 1983. Four axial-bay and one radial-bay scientific instrument, a wide-field and planetary camera, a faint-object camera, a faint-object spectrograph, and a high-speed photometer are to be installed to conduct the initial observations. The axial instruments are constrained to envelopes with dimensions 0.9 x 0.9 x 2.2 m and their masses cannot exceed 317 kg. The observatory will also be equipped with fine-guidance sensors and a microprocessor. The design concepts of the instruments are outlined and some of the astronomical capabilities including studies of distant and local galaxies, physical properties of quasars, interrelations between quasars and active galactic nuclei are mentioned.
Tilt precursors before earthquakes on the San Andreas fault, California
Johnston, M.J.S.; Mortensen, C.E.
1974-01-01
An array of 14 biaxial shallow-borehole tiltmeters (at 10-7 radian sensitivity) has been installed along 85 kilometers of the San Andreas fault during the past year. Earthquake-related changes in tilt have been simultaneously observed on up to four independent instruments. At earthquake distances greater than 10 earthquake source dimensions, there are few clear indications of tilt change. For the four instruments with the longest records (>10 months), 26 earthquakes have occurred since July 1973 with at least one instrument closer than 10 source dimensions and 8 earthquakes with more than one instrument within that distance. Precursors in tilt direction have been observed before more than 10 earthquakes or groups of earthquakes, and no similar effect has yet been seen without the occurrence of an earthquake.
Ultrasonic interface level analyzer shop test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
STAEHR, T.W.
1999-05-24
The Royce Instrument Corporation Model 2511 Interface Level Analyzer (URSILLA) system uses an ultrasonic ranging technique (SONAR) to measure sludge depths in holding tanks. Three URSILLA instrument assemblies provided by the W-151 project are planned to be used during mixer pump testing to provide data for determining sludge mobilization effectiveness of the mixer pumps and sludge settling rates. The purpose of this test is to provide a documented means of verifying that the functional components of the three URSILLA instruments operate properly. Successful completion of this Shop Test Procedure (STP) is a prerequisite for installation in the AZ-101 tank. Themore » objective of the test is to verify the operation of the URSILLA instruments and to verify data collection using a stand alone software program.« less
EXPRES: a next generation RV spectrograph in the search for earth-like worlds
NASA Astrophysics Data System (ADS)
Jurgenson, C.; Fischer, D.; McCracken, T.; Sawyer, D.; Szymkowiak, A.; Davis, A.; Muller, G.; Santoro, F.
2016-08-01
The EXtreme PREcision Spectrograph (EXPRES) is an optical fiber fed echelle instrument being designed and built at the Yale Exoplanet Laboratory to be installed on the 4.3-meter Discovery Channel Telescope operated by Lowell Observatory. The primary science driver for EXPRES is to detect Earth-like worlds around Sun-like stars. With this in mind, we are designing the spectrograph to have an instrumental precision of 15 cm/s so that the on-sky measurement precision (that includes modeling for RV noise from the star) can reach to better than 30 cm/s. This goal places challenging requirements on every aspect of the instrument development, including optomechanical design, environmental control, image stabilization, wavelength calibration, and data analysis. In this paper we describe our error budget, and instrument optomechanical design.
14 CFR 91.527 - Operating in icing conditions.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., windshield, stabilizing or control surface; to a powerplant installation; or to an airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may be made with frost... each rotor blade, propeller, windshield, wing, stabilizing or control surface, and each airspeed...
14 CFR 91.527 - Operating in icing conditions.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., windshield, stabilizing or control surface; to a powerplant installation; or to an airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may be made with frost... each rotor blade, propeller, windshield, wing, stabilizing or control surface, and each airspeed...
14 CFR 91.527 - Operating in icing conditions.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., windshield, stabilizing or control surface; to a powerplant installation; or to an airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may be made with frost... each rotor blade, propeller, windshield, wing, stabilizing or control surface, and each airspeed...
14 CFR 25.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Pitot heat indication systems. 25.1326 Section 25.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION....1326 Pitot heat indication systems. If a flight instrument pitot heating system is installed, an...
14 CFR 25.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Pitot heat indication systems. 25.1326 Section 25.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION....1326 Pitot heat indication systems. If a flight instrument pitot heating system is installed, an...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivera, O.; Lascola, R.; Fessler, K.
The overall objective of this project is to optics procurement and instrumental setup completed in Robert Lascola’s laboratory. An Ondax THz-Raman probe was installed in order to obtain Raman terahertz spectra of commercially available Zeolites.
14 CFR 25.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Pitot heat indication systems. 25.1326 Section 25.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION....1326 Pitot heat indication systems. If a flight instrument pitot heating system is installed, an...
14 CFR 25.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Pitot heat indication systems. 25.1326 Section 25.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION....1326 Pitot heat indication systems. If a flight instrument pitot heating system is installed, an...
14 CFR 25.1326 - Pitot heat indication systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Pitot heat indication systems. 25.1326 Section 25.1326 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION....1326 Pitot heat indication systems. If a flight instrument pitot heating system is installed, an...
21 CFR 809.10 - Labeling for in vitro diagnostic products.
Code of Federal Regulations, 2010 CFR
2010-04-01
... principles of the procedure. Explain concisely, with chemical reactions and techniques involved, if...) Instruments: (i) Use or function. (ii) Installation procedures and special requirements. (iii) Principles of... product testing prior to full commercial marketing (for example, for use on specimens derived from humans...
78 FR 27241 - Agency Information Collection Activities; Proposed Collection: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-09
... the data collection plans and draft instruments, email [email protected] or call the HRSA Information... technology to minimize the information collection burden. Information Collection Request Title... instructions; to develop, acquire, install and utilize technology and systems for the purpose of collecting...
Effectiveness of Miles-Per-Gallon Meters as a Means to Conserve Gasoline in Automobiles
DOT National Transportation Integrated Search
1976-10-01
This report is an assessment of fuel flow instruments reading directly in miles per gallon (mpg). It describes currently available mpg meters, their installation, utility, and safety and presents an analysis of potential cost savings. It discusses me...
24 CFR 232.540 - Method of loan payment and amortization period.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety Equipment Eligible Security Instruments § 232.540 Method of loan...
Webb Instruments Perfected to Microscopic Levels
2014-06-20
Dressed in a cleanroom suit to prevent contamination, Optics Technician Jeff Gum aligns a replacement Focal Plane Assembly (FPA) with a powerful three-dimensional microscope at NASA's Goddard Space Flight Center in Greenbelt, Md. This FPA will be installed on the Near Infrared Camera (NIRCam) instrument, which has unique components that are individually tailored to see in a particular infrared wavelength range. By using the microscope, Gum ensures the FPA detectors are characterized and ready for installation onto NIRCam, the James Webb Space Telescope's primary imager that will see the light from the earliest stars and galaxies that formed in the universe. Credit: NASA/Goddard/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
NASA Astrophysics Data System (ADS)
Canuel, B.; Pelisson, S.; Amand, L.; Bertoldi, A.; Cormier, E.; Fang, B.; Gaffet, S.; Geiger, R.; Harms, J.; Holleville, D.; Landragin, A.; Lefèvre, G.; Lhermite, J.; Mielec, N.; Prevedelli, M.; Riou, I.; Bouyer, P.
2016-04-01
The Matter-Wave laser Interferometer Gravitation Antenna, MIGA, will be a hybrid instrument composed of a network of atom interferometers horizontally aligned and interrogated by the resonant field of an optical cavity. This detector will provide measurements of sub Hertz variations of the gravitational strain tensor. MIGA will bring new methods for geophysics for the characterization of spatial and temporal variations of the local gravity field and will also be a demonstrator for future low frequency Gravitational Wave (GW) detections. MIGA will enable a better understanding of the coupling at low frequency between these different signals. The detector will be installed underground in Rustrel (FR), at the "Laboratoire Souterrain Bas Bruit" (LSBB), a facility with exceptionally low environmental noise and located far away from major sources of anthropogenic disturbances. We give in this paper an overview of the operating mode and status of the instrument before detailing simulations of the gravitational background noise at the MIGA installation site.
New instruments for solar research
NASA Technical Reports Server (NTRS)
Rust, David M.; O'Byrne, John W.; Sterner, Raymond E., II
1990-01-01
In fulfilment of its goal to develop early detection and warning of emerging solar magnetic fields, the Center for Applied Solar Physics (CASP) has designed and constructed a solar vector magnetograph (VMG) that will provide unique data on the sunspot regions where flares originate. The instrument is reportedly beginning to approach its goals of measuring all three components of the solar magnetic field with a sensitivity of 50 to 100 G and a spatial resolution on the sun of about 700 km (1 arcsec). Importance of new high-resolution capabilities is stressed and the interpretation of VMG measurements is discussed. The performance of the solar VMG, installed in a 6-m dome at the National Solar Observatory at Sacramento Peak in Sunspot, New Mexico, and its construction and environment are described; particular attention is given to the use and function of the filters. Initial results are examined, including a description and analysis of a magnetogram obtained after installation of an improved blocking filter.
NASA Astrophysics Data System (ADS)
Knuth, F.; Vardaro, M.; Belabbassi, L.; Smith, M. J.; Garzio, L. M.; Crowley, M. F.; Kerfoot, J.; Kawka, O. E.
2016-02-01
The National Science Foundation's Ocean Observatories Initiative (OOI), is a broad-scale, multidisciplinary facility that will transform oceanographic research by providing users with unprecedented access to long-term datasets from a variety of deployed physical, chemical, biological, and geological sensors. The Cabled Array component of the OOI, installed and operated by the University of Washington, is located on the Juan de Fuca tectonic plate off the coast of Oregon. It is a unique network of >100 cabled instruments and instrumented moorings transmitting data to shore in real-time via fiber optic technology. Instruments now installed include HD video and digital still cameras, mass spectrometers, a resistivity-temperature probe inside the orifice of a high-temperature hydrothermal vent, upward-looking ADCP's, pH and pC02 sensors, Horizontal Electrometer Pressure Inverted Echosounders and many others. Here, we present the technical aspects of data streaming from the Cabled Array through the OOI Cyberinfrastructure. We illustrate the types of instruments and data products available, data volume and density, processing levels and algorithms used, data delivery methods, file formats and access methods through the graphical user interface. Our goal is to facilitate the use and access to these unprecedented, co-registered oceanographic datasets. We encourage researchers to collaborate through the use of these simultaneous, interdisciplinary measurements, in the exploration of short-lived events (tectonic, volcanic, biological, severe storms), as well as long-term trends in ocean systems (circulation patterns, climate change, ocean acidity, ecosystem shifts).
A fast RCS accuracy assessment method for passive radar calibrators
NASA Astrophysics Data System (ADS)
Zhou, Yongsheng; Li, Chuanrong; Tang, Lingli; Ma, Lingling; Liu, QI
2016-10-01
In microwave radar radiometric calibration, the corner reflector acts as the standard reference target but its structure is usually deformed during the transportation and installation, or deformed by wind and gravity while permanently installed outdoor, which will decrease the RCS accuracy and therefore the radiometric calibration accuracy. A fast RCS accuracy measurement method based on 3-D measuring instrument and RCS simulation was proposed in this paper for tracking the characteristic variation of the corner reflector. In the first step, RCS simulation algorithm was selected and its simulation accuracy was assessed. In the second step, the 3-D measuring instrument was selected and its measuring accuracy was evaluated. Once the accuracy of the selected RCS simulation algorithm and 3-D measuring instrument was satisfied for the RCS accuracy assessment, the 3-D structure of the corner reflector would be obtained by the 3-D measuring instrument, and then the RCSs of the obtained 3-D structure and corresponding ideal structure would be calculated respectively based on the selected RCS simulation algorithm. The final RCS accuracy was the absolute difference of the two RCS calculation results. The advantage of the proposed method was that it could be applied outdoor easily, avoiding the correlation among the plate edge length error, plate orthogonality error, plate curvature error. The accuracy of this method is higher than the method using distortion equation. In the end of the paper, a measurement example was presented in order to show the performance of the proposed method.
Multi-instrument Method to Map Spatial and Temporal Patterns of Snowmelt Infiltration
NASA Astrophysics Data System (ADS)
Hyde, K.; Beverly, D.; Thayer, D.; Speckman, H. N.; Parsekian, A.; Kelleners, T.
2015-12-01
Mapping spatial patterns of relative soil moisture over time may improve understanding of snowmelt infiltration processes in heterogeneous systems. Conventional soil water measurement methods disturb soil properties and rocky materials generally limit installation of monitoring instruments to shallow depths in mountainous landscapes with snowmelt dominated hydrology. Modifications to existing technology combined with low impact installation methods provide high temporal and spatial resolution of relative soil moisture as well as a temperature profile and water table level. Closely spaced (10cm) electrical resistance pads are combined in a small diameter (2.54 cm) tube with temperature probes each 50cm, a pressure transducer, and a tube to extract groundwater for stable isotope analysis. This vertical probe array (VPA) extends 3.2m and is installed in a small diameter (4 cm) bore using a backpack drill limiting soil disturbance. Two VPAs are installed in the Snowy Range of Wyoming, one in a forested mountainous environment impacted by mortality by insects and disease and the other (limited to resistance pads only) in recently burned sagelands. Each VPA is co-located with meteorological stations. Eddy-covariance, sap flux, electrical resistivity, snowpack survey, and other hillslope eco-hydrology measurements accompany the fully instrumented VPA. Data are sampled and recorded at 5 or 15 minute intervals starting in December 2014. Over the winter both sites exhibit highly variable patterns of relatively dry soils with steady increase in wetness. Abrupt increases in relative wetness occurred with short periods of warming temperatures in Spring. Following a temperature increase in the forested site the relative moisture dramatically increased over a period of several hours at all depths as water level rose 1m within 8 hours. In contrast, following snowmelt relative moisture in the sageland site increased gradually and systematically with depth over a period of two weeks. The sage area also demonstrates sensitivity to rainfall events where the forested hillslope is insensitive to rain inputs. Long term monitoring at high temporal frequency will likely reveal other patterns expected to advance understanding of snowmelt infiltration processes at previously inaccessible depths within the vadose zone.
By the Dozen: NASA's James Webb Space Telescope Mirrors
2016-01-03
Caption: One dozen (out of 18) flight mirror segments that make up the primary mirror on NASA's James Webb Space Telescope have been installed at NASA's Goddard Space Flight Center. Credits: NASA/Chris Gunn More: Since December 2015, the team of scientists and engineers have been working tirelessly to install all the primary mirror segments onto the telescope structure in the large clean room at NASA's Goddard Space Flight Center in Greenbelt, Maryland. The twelfth mirror was installed on January 2, 2016. "This milestone signifies that all of the hexagonal shaped mirrors on the fixed central section of the telescope structure are installed and only the 3 mirrors on each wing are left for installation," said Lee Feinberg, NASA's Optical Telescope Element Manager at NASA Goddard. "The incredibly skilled and dedicated team assembling the telescope continues to find ways to do things faster and more efficiently." Each hexagonal-shaped segment measures just over 4.2 feet (1.3 meters) across and weighs approximately 88 pounds (40 kilograms). After being pieced together, the 18 primary mirror segments will work together as one large 21.3-foot (6.5-meter) mirror. The primary mirror will unfold and adjust to shape after launch. The mirrors are made of ultra-lightweight beryllium. The mirrors are placed on the telescope's backplane using a robotic arm, guided by engineers. The full installation is expected to be completed in a few months. The mirrors were built by Ball Aerospace & Technologies Corp., Boulder, Colorado. Ball is the principal subcontractor to Northrop Grumman for the optical technology and lightweight mirror system. The installation of the mirrors onto the telescope structure is performed by Harris Corporation of Rochester, New York. Harris Corporation leads integration and testing for the telescope. While the mirror assembly is a very significant milestone, there are many more steps involved in assembling the Webb telescope. The primary mirror and the tennis-court-sized sunshield are the largest and most visible components of the Webb telescope. However, there are four smaller components that are less visible, yet critical. The instruments that will fly aboard Webb - cameras and spectrographs with detectors able to record extremely faint signals — are part of the Integrated Science Instrument Module (ISIM), which is currently undergoing its final cryogenic vacuum test and will be integrated with the mirror later this year.
By the Dozen: NASA's James Webb Space Telescope Mirrors
2016-01-03
A view of the one dozen (out of 18) flight mirror segments that make up the primary mirror on NASA's James Webb Space Telescope have been installed at NASA's Goddard Space Flight Center. Credits: NASA/Chris Gunn More: Since December 2015, the team of scientists and engineers have been working tirelessly to install all the primary mirror segments onto the telescope structure in the large clean room at NASA's Goddard Space Flight Center in Greenbelt, Maryland. The twelfth mirror was installed on January 2, 2016. "This milestone signifies that all of the hexagonal shaped mirrors on the fixed central section of the telescope structure are installed and only the 3 mirrors on each wing are left for installation," said Lee Feinberg, NASA's Optical Telescope Element Manager at NASA Goddard. "The incredibly skilled and dedicated team assembling the telescope continues to find ways to do things faster and more efficiently." Each hexagonal-shaped segment measures just over 4.2 feet (1.3 meters) across and weighs approximately 88 pounds (40 kilograms). After being pieced together, the 18 primary mirror segments will work together as one large 21.3-foot (6.5-meter) mirror. The primary mirror will unfold and adjust to shape after launch. The mirrors are made of ultra-lightweight beryllium. The mirrors are placed on the telescope's backplane using a robotic arm, guided by engineers. The full installation is expected to be completed in a few months. The mirrors were built by Ball Aerospace & Technologies Corp., Boulder, Colorado. Ball is the principal subcontractor to Northrop Grumman for the optical technology and lightweight mirror system. The installation of the mirrors onto the telescope structure is performed by Harris Corporation of Rochester, New York. Harris Corporation leads integration and testing for the telescope. While the mirror assembly is a very significant milestone, there are many more steps involved in assembling the Webb telescope. The primary mirror and the tennis-court-sized sunshield are the largest and most visible components of the Webb telescope. However, there are four smaller components that are less visible, yet critical. The instruments that will fly aboard Webb - cameras and spectrographs with detectors able to record extremely faint signals — are part of the Integrated Science Instrument Module (ISIM), which is currently undergoing its final cryogenic vacuum test and will be integrated with the mirror later this year.
Solar energy system performance evaluation: Seasonal report for fern, Tunkhannock, Pennsylvania
NASA Technical Reports Server (NTRS)
1980-01-01
The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is reported, and technical contributions to the definition of techniques and requirements for solar energy system design are made. The solar energy system was designed to supply space heating and domestic hot water for single-family residences. The system consists of air flat plate collectors, storage tank, pumps, heat exchangers, associated plumbing, and controls.
Solar energy system performance evaluation: Seasonal report for SEMCO, Loxahatchee, Florida
NASA Technical Reports Server (NTRS)
1980-01-01
The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system and the technical contributions to the definition of techniques and requirements solar energy system design are analyzed. The solar energy system was designed to supply domestic hot water for a family of four, single-family residences. It consists of two liquid flat plate collectors, single tank, controls, and transport lines.
NASA Technical Reports Server (NTRS)
Zalovick, John A; Lina, Lindsay J; Trant, James P , Jr
1953-01-01
A method is described for calibrating airspeed installation on airplanes at transonic and supersonic speeds in vertical-plane maneuvers in which use is made of measurements of normal and longitudinal accelerations and attitude angle. In this method all the required instrumentation is carried within the airplane. An analytical study of the effects of various sources of error on the accuracy of an airspeed calibration by the accelerometer method indicated that the required measurements can be made accurately enough to insure a satisfactory calibration.
NASA Astrophysics Data System (ADS)
Roberts, P. M.; Ten Cate, J. A.; House, L. S.; Greene, M. K.; Morton, E.; Kelley, R. E.
2013-12-01
The Los Alamos Seismic Network (LASN) has operated for 41 years, and provided the data to locate more than 2,500 earthquakes in north-central New Mexico. The network was installed for seismic verification research, as well as to monitor and locate earthquakes near Los Alamos National Laboratory (LANL). LASN stations are the only monitoring stations in New Mexico north of Albuquerque. The original network once included 22 stations in northern Mew Mexico. With limited funding in the early 1980's, the network was downsized to 7 stations within an area of about 15 km (N-S) by 15 km (E-W), centered on Los Alamos. Over the last four years, eight additional stations have been installed, which have considerably expanded the spatial coverage of the network. Currently, 7 stations have broadband, three-component seismometers with digital telemetry, and the remaining 8 have traditional 1 Hz short-period seismometers with either analog telemetry or on-site digital recording. A vertical array of accelerometers was also installed in a wellbore on LANL property. This borehole array has 3-component digital strong-motion sensors. Recently we began upgrading the local strong-motion accelerometer (SMA) network as well, with the addition of high-resolution digitizers and high-sensitivity force-balance accelerometers (FBA). We will present an updated description of the current LASN station, instrumentation and telemetry configurations, as well as the data acquisition and event-detection software structure used to record events in Earthworm. Although more than 2,000 earthquakes were detected and located in north-central New Mexico during the first 11 years of LASN's operation (1973 to 1984), currently only 1-2 earthquakes per month are detected and located within about 150 km of Los Alamos. Over 850 of these nearby earthquakes have been located from 1973 to present. We recently updated the LASN earthquake catalog for north-central New Mexico up through 2012 and most of 2013. Locations for these earthquakes are based on new, consistently picked arrival times, updated station locations, and the best available velocity model. Most have magnitudes less than 1.5 and are not contained in the catalogs of any other network. With 3 of the new broadband stations in and around the nearby Valles Caldera, LASN is now able to monitor even very small volcano-seismic events that may be associated with the caldera. The expanded station coverage and instrument sensitivity has also allowed detection of smaller, more distant events and new types of peculiar, non-earthquake signals we had not previously seen (e.g., train noise). These unusual signals have complicated our event discrimination efforts. We will show an updated map of north-central New Mexico seismicity based on these recent efforts, as well as examples of some the new types of data LASN is now picking up. Although the network and data are generally not accessible to the public, requests for data can be granted on a case-by-case basis.
Results of the first detection units of KM3NeT
NASA Astrophysics Data System (ADS)
Biagi, Simone; KM3NeT Collaboration
2017-12-01
The KM3NeT collaboration is building a km3-scale neutrino telescope in the Mediterranean Sea. The current phase of construction comprises the deep-sea and onshore infrastructures at two installation sites and the installation of the first detection units for the "ARCA" (Astroparticle Research with Cosmics in the Abyss) and "ORCA" (Oscillation Research with Cosmics in the Abyss) detector. At the KM3NeT-It site, 80 km offshore Capo Passero, Italy, the first 32 detection units for the ARCA detector are being installed and at the KM3Net-Fr site, 40 km offshore Toulon, France, 7 detection units for the ORCA detector will be deployed. The second phase of KM3NeT foresees the completion of ARCA for neutrino astronomy at energies above TeV and ORCA for neutrino mass hierarchy studies at energies in the GeV range. The basic element of the KM3NeT detector is the detection unit. In the ARCA geometry, the detection unit is a 700 m long vertical structure hosting 18 optical modules. Each optical module comprises 31 3 in photomultiplier tubes, instruments to monitor environmental parameters, and the electronic boards for the digitisation of the PMT signals and the management of data acquisition. In their final configuration, both ARCA and ORCA will be composed of about 200 detection units. The first detection unit was installed at the KM3NeT-It site in December 2015. It is active and taking data since its connection to the subsea network. The time of arrival and the duration of photon hits on each of the photomultipliers is measured with a time resolution of 1 ns and transferred onshore where the measurements are processed, triggered and stored on disk. A time calibration procedure, based on data recorded with flashing LED beacons during dedicated periods, allows for time synchronisation of the signals from the optical modules at the nanosecond level. In May 2016, an additional detection unit was installed at the KM3NeT-It site. The first results with two active detection units are presented. An update of the detector status and construction is given.
VizieR Online Data Catalog: New minima timings and RVs for 3 eclipsing binaries (Zasche+, 2017)
NASA Astrophysics Data System (ADS)
Zasche, P.; Jurysek, J.; Nemravova, J.; Uhlar, R.; Svoboda, P.; Wolf, M.; Honkova, K.; Masek, M.; Prouza, M.; Cechura, J.; Korcakova, D.; Slechta, M.
2018-04-01
Spectroscopy was obtained in two observatories. Most of the data points for these systems came from the Ondrejov observatory and its 2 m telescope (resolution R~12500). Additionally, data on BR Ind and some data on QS Aql were obtained with the FEROS instrument mounted on the 2.2 m MPG telescope located in La Silla Observatory in Chile (R~48000). Photometry for these three systems was collected over the time span of 2008 to 2016. Owing to the relatively high brightness of the targets, only rather small telescopes were used for these photometric observations. The system V773 Cas was observed (by one of the authors, PS) with a 34 mm refractor at a private observatory in Brno, Czech Republic, using an SBIG ST-7XME CCD camera. The star QS Aql was monitored (by one of the authors, RU) with a similar instrument at a private observatory in Jilove u Prahy, Czech Republic, using a G2-0402 CCD camera. The only southern star, BR Ind, was observed with the FRAM telescope (Prouza et al. 2010AdAst2010E..31P), installed and operated at the Pierre Auger Observatory at Malargue, Argentina. (2 data files).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wemple, R.P.; Meyer, R.D.; Jacobson, R.D.
This work in partnership with industry is a continuation of cost- effective innovative, directional boring development begun in FY90 and planed to extend into FY94. Several demonstrations of the strategy of building hybrid hardware from utilities installation, geothermal, and soil mechanics technologies have been performed at Sandia National Laboratories (SNL) and at Charles Machine works (CMW) test sites as well as at a commercial refinery site. Additional tests at the SNL Directional Boring Test Range (DBTR) and a lagoon site are planned in calendar 1991. A new companion project to develop and demonstrate a hybrid capability for horizontal logging withmore » penetrometers, specialty instruments and samplers has been taken from concept to early prototype hardware. The project goal of extending the tracking/locating capability of the shallow boring equipment to 80in. is being pursued with encouraging results at 40in. depths. Boring costs, not including tailored well completions dictated by individual site parameters, are estimated at $20 to $50 per foot. Applications continue to emerge for this work and interest continues to be expressed by DoD and EPA researchers and environmental site engineers. 12 figs.« less
Boore, David M.
1999-01-01
Displacements derived from the accelerogram recordings of the 1999 Chi-Chi, Taiwan earthquake at stations TCU078 and TCU129 show drifts when only a simple baseline derived from the pre-event portion of the record is removed from the records. The appearance of the velocity and displacement records suggests that changes in the zero-level of the acceleration are responsible for these drifts. The source of the shifts in zero-level are unknown, but might include tilts in the instruments or the response of the instruments to strong shaking. This note illustrates the effect on the velocity, displacement, and response spectra of several schemes for accounting for these baseline shifts. The most important conclusion for earthquake engineering purposes is that the response spectra for periods less than about 20 sec are unaffected by the baseline correction. The results suggest, however, that staticdisplac ements estimated from the instruments should be used with caution. Although limited to the analysis of only two recordings, the results may have more general significance both for the many other recordings of this earthquake and for data that will be obtained in the future from similar high-quality accelerograph networks now being installed or soon to be installed in many parts of the world.
FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-15
The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog andmore » digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work on this project.« less
STS-82 Crew members pose in from of Discovery after Landing
NASA Technical Reports Server (NTRS)
1997-01-01
The STS-82 crew stands in front of the Space Shuttle Discovery after landing at KSC's Shuttle Landing Facility on Runway 15 to conclude a 10-day mission to service the orbiting Hubble Space Telescope (HST). Crew members are (from left to right) Mission Specialist Steven A. Hawley, Mission Commander Kenneth D. Bowersox, Mission Specialist Joseph R. 'Joe' Tanner, Pilot Scott J. 'Doc' Horowitz, Mission Specialist Gregory J. Harbaugh, Payload Commander Mark C. Lee and Mission Specialist Steven L. Smith. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997.
VizieR Online Data Catalog: Kepler-10 RV measurements by HARPS-N (Dumusque+, 2014)
NASA Astrophysics Data System (ADS)
Dumusque, X.; Bonomo, A. S.; Haywood, R. D.; Malavolta, L.; Segransan, D.; Buchhave, L. A.; Collier, Cameron A.; Latham, D. W.; Molinari, E.; Pepe, F.; Udry, S.; Charbonneau, D.; Cosentino, R.; Dressing, C. D.; Figueira, P.; Fiorenzano, A. F. M.; Gettel, S.; Harutyunyan, A.; Horne, K.; Lopez-Morales, M.; Lovis, C.; Mayor, M.; Micela, G.; Motalebi, F.; Nascimbeni, V.; Phillips, D. F.; Piotto, G.; Pollacco, D.; Queloz, D.; Rice, K.; Sasselov, D.; Sozzetti, A.; Szentgyorgyi, A.; Watson, C.
2017-03-01
We monitored the RV variation of Kepler-10 with the HARPS-N spectrograph installed on the 3.57-m Telescopio Nazionale Galileo at the Spanish Observatorio del Roque de los Muchachos, La Palma Island, Spain (Cosentino et al. 2012SPIE.8446E..1VC). This instrument is an updated version of the original HARPS planet hunter installed on the 3.6-m telescope at the European Southern Observatory on La Silla, Chile (Mayor et al. 2003Msngr.114...20M). Just like its older brother, the HARPS-N instrument is an ultra-stable fiber-fed high-resolution (R = 115,000) optical echelle spectrograph optimized for the measurement of very precise RVs. The use of a more modern monolithic 4kx4k CCD enclosed in a more temperature stable cryostat, and the use of octagonal fibers for a better scrambling of the incoming light fed into the spectrograph should improve the precision of the instrument compared to HARPS. Scientific operations began at HARPS-N in 2012 August. Over the first two observing seasons, we obtained 157 RV measurements of Kepler-10. Four observations that were obtained during bad weather conditions had very low signal to noise (S/N, <10) and were rejected. (1 data file).
1997-02-21
Accompanied by former astronaut Michael J. McCulley, several members of the STS-82 crew look at thermal protection system tile under the Space Shuttle Discovery on the runway at the Shuttle Landing Facility shortly after the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). From left to right, they are Mission Specialist Steven A. Hawley; Michael J. McCulley, currently vice president and associate program manager for ground operations for the United Space Alliance at KSC; Mission Specialists Joseph R. "Joe" Tanner and Steven L. Smith (back to camera); and Payload Commander Mark C. Lee. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997
Burnishing Systems: a Short Survey of the State-of-the-art
NASA Astrophysics Data System (ADS)
Bobrovskij, I. N.
2018-01-01
The modern technological solutions allowing to implement a new technology of surface plastic deformation are considered. The technological device allowing to implement the technology of hyper productive surface plastic deformation or wide burnishing (machining time is up to 2-3 revolutions of workpiece) is presented. The device provides the constant force of instruments regardless the beating, non-roundness and other surface shape defects; usable and easily controlled force adjustment; precise installation of instruments and holders toward the along the worpieces axis; automation of the supply and retraction of instruments. Also the device allowing to implement the technology of nanostructuring burnishing is presented. The design of the device allows to eliminate the effect of auto-oscillations.
NASA Astrophysics Data System (ADS)
Simeonov, Valentin; van den Bergh, Hubert; Parlange, Marc
2010-05-01
A new, long open-path instrument for monitoring of path-averaged methane and water vapor concentrations will be presented. The instrument is built on the monostatic scheme (transceiver - distant retroreflector). A VCSEL tunable diode laser (TDL) with a central wavelength of 1654 nm is used as a light source. A specially designed, single-cell, hollow-cube retroreflector with 150 mm aperture will be installed at 1200 m from the transceiver in the final deployment at Jungfraujjoch and 100 mm retroreflectors will be used in the other applications. The receiver is built around a 20 cm Newtonian telescope. To avoid distortions in the shape of a methane line, caused by atmospheric turbulences, the line is scanned within 1 µs. Fast InGaAs photodiodes and 200 MHz are used to achieve this scanning rate. The expected concentration resolution for the above mentioned path lengths is of the order of 2 ppb. The instrument is developed at the Swiss Federal Institute of Technology - Lausanne (EPFL) Switzerland and will be used within the GAW+ CH program for long-term monitoring of background methane concentration in the Swiss Alps. After completing the initial tests at EPFL the instrument will be installed in 2012 at the High Altitude Research Station Jungfraujoch (HARSJ) located at 3580 m ASL. The HARSJ is one of the 24 global GAW stations and carries on continuous observations of a number of trace gasses, including methane. One of the goals of the project is to compare path-averaged to ongoing point measurements of methane in order to identify possible influence of the station. Future deployments of a copy of the instrument include the Colombian part of Amazonia and Siberian wetlands.
Clark, Dennis A.; Izbicki, John A.; Johnson, Russell D.; Land, Michael
2009-01-01
This report presents data on the physical and hydraulic properties of unsaturated alluvial deposits and on the chemical and isotopic composition of water collected at two recharge sites in the western part of the Mojave Desert, near Victorville, California, from 2001 to 2006. Unsaturated-zone monitoring sites were installed adjacent to the two recharge ponds using the ODEX air-hammer and air rotary method to depths of about 460 feet and 269 feet below land surface. Each of the two unsaturated-zone monitoring sites included a water-table well, matric-potential sensors, and suction-cup lysimeters installed in a single bore hole. Drilling procedures, lithologic and geophysical data, and site construction and instrumentation are described. Core material was analyzed for water content, bulk density, water potential, particle size, and water retention. The chemical composition of leachate from almost 400 samples of cores and cuttings was determined. Water from suction-cup lysimeters also was analyzed for chemical and isotopic composition. In addition, data on the chemical and isotopic composition of groundwater from the two water-table wells are reported along with chemical and isotopic composition of the surface water in the recharge ponds.
Ares I-X Ascent Base Environments
NASA Technical Reports Server (NTRS)
Mobley, B. L.; Bender, R. L.; Canabal, F.; Smith, Sheldon D.
2011-01-01
Plume induced base heating environments were measured during the flight of the NASA Constellation Ares I-X developmental launch vehicle, successfully flown on October 28, 2009. The Ares IX first stage is a four segment Space Shuttle derived booster with base consisting of a flared aft skirt, deceleration and tumble motors, and a thermal curtain surrounding the first stage 7.2 area ratio nozzle. Developmental Flight Instrumentation (DFI) consisted of radiometers, calorimeters, pressure transducers and gas temperature probes installed on the aft skirt and nozzle to measure the base environments. In addition, thermocouples were also installed between the layers of the flexible thermal curtain to provide insight into the curtain response to the base environments and to assist in understanding curtain failure during reentry. Plume radiation environment predictions were generated by the Reverse Monte Carlo (RMC) code and the convective base heating predictions utilized heritage MSFC empirical methods. These predictions were compared to the DFI data and results from the flight videography. Radiation predictions agreed with the flight measured data early in flight but gauge failures prevented high altitude comparisons. The convective environment comparisons demonstrated the need to improve the prediction methodology; particularly for low altitude, local plume recirculation. The convective comparisons showed relatively good agreement at altitudes greater than 50,000 feet.
Brief: Field measurements of casing tension forces
DOE Office of Scientific and Technical Information (OSTI.GOV)
Quigley, M.S.; Lewis, D.B.; Boswell, R.S.
1995-02-01
Tension forces acting on individual casing joints were accurately measured during installation of 10,158 ft of 9 5/8-in. {times} 47-lbm/ft casing and 11,960 ft of 11 7/8-in. {times} 71.8-lbm/ft casing. A unique casing load table (CLT) weighed the casing string after the addition of each casing joint. Strain gauges attached inside the pin ends of instrumented casing joints (ICJ`s) directly measured tension force on those joints. A high-speed computer data-acquisition system (DAS) automatically recorded data from all the sensors. Several casing joints were intentionally subjected to extreme deceleration to determine upper limits for dynamic tension forces. Data from these testsmore » clearly show effects of wellbore friction and casing handling conditions. In every case, tension forces in the casing during maximum deceleration were considerably less than expected. In some cases, the highest tension forces occurred when the casing lifted out of the slips. Peak tension forces caused by setting the casing slips were typically no more than 5% greater than tension forces in the casing at rest. This dynamic amplification was far less than the 60% value used in the previous casing design method. Reducing the safety factor for installation loads has permitted use of lighter, less-expensive casing than dictated by older design criteria.« less
40 CFR 86.116-94 - Calibrations, frequency and overview.
Code of Federal Regulations, 2010 CFR
2010-07-01
... positive displacement pump or Critical Flow Venturi shall be calibrated following initial installation... an organic gas retention and calibration on the evaporative emissions enclosure (see § 86.117-90(c)). (4) Calibrate the gas meters or flow instrumentation used for providing total flow measurement for...
DOT National Transportation Integrated Search
2007-12-01
Two Stormwater Treatment Systems were instrumented and monitored in the field for one : year to evaluate their effectiveness at contaminant removal. The Vortechs and the V2b1TM : were both installed by the NYS Department of Transportation at locati...
Code of Federal Regulations, 2011 CFR
2011-01-01
... includes transfers of real property subject to a real property loan by assumptions, installment land sales... other like transfers.“Completed credit application” has the same meaning as completed application for... security instrument upon a sale of transfer of all or any part of the real property securing the loan...
Code of Federal Regulations, 2010 CFR
2010-01-01
... includes transfers of real property subject to a real property loan by assumptions, installment land sales... other like transfers.“Completed credit application” has the same meaning as completed application for... security instrument upon a sale of transfer of all or any part of the real property securing the loan...
INSTRUMENTATION AND CONTROLS DIVISION ELECTRICAL DESIGN STANDARDS AND GRAPHICAL SYMBOLS
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1961-11-01
Copies are presented of the American Standards Association graphical symbols for electrical and electronic equipment and systems. Recommendations are given for electrical elementary design layout, device codings, etc., for permanent type installations. Electrical diagrams copied from American Drafting Standards Manual are presented. (M.C.G.)
Aviation Maintenance Technology. General. G104 Technical Mechanics. Instructor Material.
ERIC Educational Resources Information Center
Oklahoma State Board of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.
These instructor materials for an aviation maintenance technology course contain five instructional modules. The modules cover the following topics: performing aircraft ground handling and servicing, using hand and power tools and precision measuring instruments, identifying and selecting aircraft hardware, fabricating and installing rigid and…
DOT National Transportation Integrated Search
2008-05-01
The performance of three Video Detection Systems (VDS), namely Autoscope, Iteris, and Peek, was evaluated : at stop bar and advance locations, at an instrumented signalized intersection located in Rantoul, Illinois, utilizing : a side-by-side install...
Gemini Program Mission Report for Gemini-Titan 1 (GT-1)
NASA Technical Reports Server (NTRS)
1964-01-01
The Gemini-Titan 1 (GT-1) space vehicle was comprised of the Gemini spacecraft and the Gemini launch vehicle. The Gemini launch vehicle is a two-stage modified Titan II ICBM. The major modifications are the addition of a malfunction detection system and a secondary flight controls system. The Gemini spacecraft, designed to carry a crew of two men on earth orbital and rendezvous missions, was unmanned for the flight reported herein (GT-1). There were no complete Gemini flight systems on board; however, the C-band transponder and telemetry transmitters were Gemini flight subsystems. Dummy equipment, having a mass and moment of inertia equal to flight system equipment, was installed in the spacecraft. The Spacecraft was instrumented to obtain data on spacecraft heating, structural loading, vibration, sound pressure levels, and temperature and pressure during the launch phase.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ben-Itzhak, Itzik; Carnes, Kevin D.; Cocke, C. Lew
2014-05-09
This instrumentation grant funded the development and installation of a state-of-the-art laser system to be used for the DOE funded research at the J.R. Macdonald Laboratory at Kansas State University. Specifically, we purchased a laser based on the KMLABs Red-Dragon design, which has a high repetition rate of 10-20 kHz crucial for multi-parameter coincidence measurements conducted in our lab. This laser system is carrier-envelope phase (CEP) locked and provides pulses as short as 21 fs directly from the amplifier (see details below). In addition, we have developed a pulse compression setup that provides sub 5 fs pulses and a CEPmore » tagging capability that allows for long measurements of CEP dependent processes.« less
Daylighting and shuttering: RIB system mechanical design and preliminary performance data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinney, L.; Reynolds, D.
1983-12-01
The Reflective, Insulating Blind (RIB) system is a flexible, user-controlled daylighting device which also has direct thermal advantages: it can reject a considerable portion of summer sun while still retaining an adequate daylighting function; and it functions as moveable insulation to significantly decrease thermal losses through fenestration during evening hours. The conceptual design of the RIB system was accomplished by Barnes and Shapira at the Oak Ridge National Laboratory (ORNL). Mechanical design and prototype fabrication was accomplished by the authors and 29 systems were installed immediately inside existing south-facing windows of an energy-efficient office and dormitory at ORNL. The buildingmore » is a heavily-instrumented, passively-solar-heated structure for which reliable performance data was gathered and analyzed before the addition of RIB systems, thus facilitating the interpretation of ''after RIB'' performance data.« less
Semans, Joseph P.; Johnson, Peter G.; LeBoeuf, Jr., Robert F.; Kromka, Joseph A.; Goron, Ronald H.; Hay, George D.
1993-01-01
A trainer, mounted and housed within a mobile console, is used to teach and reinforce fluid principles to students. The system trainer has two centrifugal pumps, each driven by a corresponding two-speed electric motor. The motors are controlled by motor controllers for operating the pumps to circulate the fluid stored within a supply tank through a closed system. The pumps may be connected in series or in parallel. A number of valves are also included within the system to effect different flow paths for the fluid. In addition, temperature and pressure sensing instruments are installed throughout the closed system for measuring the characteristics of the fluid, as it passes through the different valves and pumps. These measurements are indicated on a front panel mounted to the console, as a teaching aid, to allow the students to observe the characteristics of the system.
Automated installation methods for photovoltaic arrays
NASA Astrophysics Data System (ADS)
Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.
1982-11-01
Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.
Aerodynamic Flight-Test Results for the Adaptive Compliant Trailing Edge
NASA Technical Reports Server (NTRS)
Cumming, Stephen B.; Smith, Mark S.; Ali, Aliyah N.; Bui, Trong T.; Ellsworth, Joel C.; Garcia, Christian A.
2016-01-01
The aerodynamic effects of compliant flaps installed onto a modified Gulfstream III airplane were investigated. Analyses were performed prior to flight to predict the aerodynamic effects of the flap installation. Flight tests were conducted to gather both structural and aerodynamic data. The airplane was instrumented to collect vehicle aerodynamic data and wing pressure data. A leading-edge stagnation detection system was also installed. The data from these flights were analyzed and compared with predictions. The predictive tools compared well with flight data for small flap deflections, but differences between predictions and flight estimates were greater at larger deflections. This paper describes the methods used to examine the aerodynamics data from the flight tests and provides a discussion of the flight-test results in the areas of vehicle aerodynamics, wing sectional pressure coefficient profiles, and air data.
30 CFR 250.1629 - Additional production and fuel gas system requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (4) Fire- and gas-detection system. (i) Fire (flame, heat, or smoke) sensors shall be installed in all enclosed classified areas. Gas sensors shall be installed in all inadequately ventilated, enclosed... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Additional production and fuel gas system...
30 CFR 250.1629 - Additional production and fuel gas system requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... structure. (4) Fire- and gas-detection system. (i) Fire (flame, heat, or smoke) sensors shall be installed in all enclosed classified areas. Gas sensors shall be installed in all inadequately ventilated... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Additional production and fuel gas system...
Katz, Jonathan E
2017-01-01
Laboratories tend to be amenable environments for long-term reliable operation of scientific measurement equipment. Indeed, it is not uncommon to find equipment 5, 10, or even 20+ years old still being routinely used in labs. Unfortunately, the Achilles heel for many of these devices is the control/data acquisition computer. Often these computers run older operating systems (e.g., Windows XP) and, while they might only use standard network, USB or serial ports, they require proprietary software to be installed. Even if the original installation disks can be found, it is a burdensome process to reinstall and is fraught with "gotchas" that can derail the process-lost license keys, incompatible hardware, forgotten configuration settings, etc. If you have running legacy instrumentation, the computer is the ticking time bomb waiting to put a halt to your operation.In this chapter, I describe how to virtualize your currently running control computer. This virtualized computer "image" is easy to maintain, easy to back up and easy to redeploy. I have used this multiple times in my own lab to greatly improve the robustness of my legacy devices.After completing the steps in this chapter, you will have your original control computer as well as a virtual instance of that computer with all the software installed ready to control your hardware should your original computer ever be decommissioned.
Volcano-Monitoring Instrumentation in the United States, 2008
Guffanti, Marianne; Diefenbach, Angela K.; Ewert, John W.; Ramsey, David W.; Cervelli, Peter F.; Schilling, Steven P.
2010-01-01
The United States is one of the most volcanically active countries in the world. According to the global volcanism database of the Smithsonian Institution, the United States (including its Commonwealth of the Northern Mariana Islands) is home to about 170 volcanoes that are in an eruptive phase, have erupted in historical time, or have not erupted recently but are young enough (eruptions within the past 10,000 years) to be capable of reawakening. From 1980 through 2008, 30 of these volcanoes erupted, several repeatedly. Volcano monitoring in the United States is carried out by the U.S. Geological Survey (USGS) Volcano Hazards Program, which operates a system of five volcano observatories-Alaska Volcano Observatory (AVO), Cascades Volcano Observatory (CVO), Hawaiian Volcano Observatory (HVO), Long Valley Observatory (LVO), and Yellowstone Volcano Observatory (YVO). The observatories issue public alerts about conditions and hazards at U.S. volcanoes in support of the USGS mandate under P.L. 93-288 (Stafford Act) to provide timely warnings of potential volcanic disasters to the affected populace and civil authorities. To make efficient use of the Nation's scientific resources, the volcano observatories operate in partnership with universities and other governmental agencies through various formal agreements. The Consortium of U.S. Volcano Observatories (CUSVO) was established in 2001 to promote scientific cooperation among the Federal, academic, and State agencies involved in observatory operations. Other groups also contribute to volcano monitoring by sponsoring long-term installation of geophysical instruments at some volcanoes for specific research projects. This report describes a database of information about permanently installed ground-based instruments used by the U.S. volcano observatories to monitor volcanic activity (unrest and eruptions). The purposes of this Volcano-Monitoring Instrumentation Database (VMID) are to (1) document the Nation's existing, ground-based, volcano-monitoring capabilities, (2) answer queries within a geospatial framework about the nature of the instrumentation, and (3) provide a benchmark for planning future monitoring improvements. The VMID is not an archive of the data collected by monitoring instruments, nor is it intended to keep track of whether a station is temporarily unavailable due to telemetry or equipment problems. Instead, it is a compilation of basic information about each instrument such as location, type, and sponsoring agency. Typically, instruments installed expressly for volcano monitoring are emplaced within about 20 kilometers (km) of a volcanic center; however, some more distant instruments (as far away as 100 km) can be used under certain circumstances and therefore are included in the database. Not included is information about satellite-based and airborne sensors and temporarily deployed instrument arrays, which also are used for volcano monitoring but do not lend themselves to inclusion in a geospatially organized compilation of sensor networks. This Open-File Report is provided in two parts: (1) an Excel spreadsheet (http://pubs.usgs.gov/of/2009/1165/) containing the version of the Volcano-Monitoring Instrumentation Database current through 31 December 2008 and (2) this text (in Adobe PDF format), which serves as metadata for the VMID. The disclaimer for the VMID is in appendix 1 of the text. Updated versions of the VMID will be posted on the Web sites of the Consortium of U.S. Volcano Observatories (http://www.cusvo.org/) and the USGS Volcano Hazards Program http://volcanoes.usgs.gov/activity/data/index.php.
1981-09-01
III I’ CANOWN" AA HNE Figure 3.3-4 Rzxsqle. Block Diagrami 24 PI LOT AIRBORNE IGROUND AGC AMPLIFIER AGC AMPLIFIER BASE • FM BASEBAND LINKE SQUARE I OO...in that T 0- •,~ ao •, _4 U- - & - @ Figure 3.3-6 Point to Point Inter- Connect Diagram. 25 the wires are merged, or joined, into no @ Lot ".U~ AFT...result in a " bottoning -out" of the isolators during high amplitude vibration. For a properly selected rubber mount, the wearing should be conservative
2008-08-08
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover has been installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller
2008-08-08
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help guide the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller
2008-08-08
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lowers the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller
2008-08-08
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller
2008-08-08
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover awaits a move to be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller
2008-08-08
CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover into place on the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller
Five HSFA telescopes and spectrographs - family silver or Greek gift?
NASA Astrophysics Data System (ADS)
Kotrč, P.
2010-12-01
A quarter-century ago five horizontal solar telescopes were delivered to Czechoslovakia from the Carl Zeiss Jena Company. Two of them have been installed in Ondrejov and one each in Hurbanovo, and Stará Lesná, with the last one reaching a mountain observatory near Alma Ata, Kazakhstan. The paper summarizes the brief history and characteristics of the instruments, different ways of their use, and realistic plans for their development. The users of the equipment received a dozen questions. The answers help us understand the importance of these instruments for the individual observatories.
One hundred years of earthquake recording at the University of California
Bolt, B. A.
1987-01-01
The best seismographs then available arrived from England in 1887 and were installed at Lick Observatory on Mt.Hamilton and at the Students Astronomical Observatory on the Berkeley campus. The first California earthquake recorded by the Lick instrument was on April 24, 1887. These seismographic stations have functioned continuously from their founding to the present day, with improvements in instruments from time to time as technology advanced. Now they are part of a sesimogrpahic network of 16 stations recording with great completeness both local and distant earthquakes.
The very low angle detector for high-energy inelastic neutron scattering on the VESUVIO spectrometer
NASA Astrophysics Data System (ADS)
Perelli Cippo, E.; Gorini, G.; Tardocchi, M.; Pietropaolo, A.; Andreani, C.; Senesi, R.; Rhodes, N. J.; Schooneveld, E. M.
2008-05-01
The Very Low Angle Detector (VLAD) bank has been installed on the VESUVIO spectrometer at the ISIS spallation neutron source. The new device allows for high-energy inelastic neutron scattering measurements, at energies above 1 eV, maintaining the wave vector transfer lower than 10Å-1. This opens a still unexplored region of the kinematical (q, ω) space, enabling new and challenging experimental investigations in condensed matter. This paper describes the main instrumental features of the VLAD device, including instrument design, detector response, and calibration procedure.
Commissioning of the new GMOS-N Hamamatsu CCDs
NASA Astrophysics Data System (ADS)
Scharwaechter, Julia; Chiboucas, Kristin; Gimeno, German; Boucher, Luc; White, John; Tapia, Eduardo; Lundquist, Michael; Rippa, Mathew; Labrie, Kathleen; Murowinski, Richard; Lazo, Manuel; Miller, Jennifer
2017-06-01
We report on the commissioning of the new Hamamatsu fully-depleted CCDs for GMOS-N, installed in the instrument in February 2017. The Hamamatsu detectors replace the e2v deep depletion devices which had been in operation since 2011. The new GMOS-N detector array is expected to provide improved red sensitivity compared to the e2v devices at wavelengths longer than ~900 nm. The commissioning of the new detector array for GMOS-N marks the final step in upgrading the two GMOS instruments at Gemini North and South with Hamamatsu detectors.
Development of a Post-Installed Deepwater Monitoring System
NASA Technical Reports Server (NTRS)
Seaman, C.; Brower, D. V.; Tang, H.; Le, S.
2015-01-01
A monitoring system that can be deployed on already existing deep water risers and flowlines has been developed. This paper describes the design concepts and testing that was performed in developing the monitoring system. A major challenge of a post-installed instrumentation system is to ensure adequate coupling is achieved between the instruments and the riser or flowline. This work investigates the sensor coupling for pipelines that are suspended in both the water column (from topside platform to the seabed) and for those that are located directly on the seabed. These different environments have resulted in two sensor attachment methods: (1) subsea adhesive sensor clamp design and (2) a friction surface sensor attachment method. This paper presents the adhesive attachment method. The monitoring elements consist of fiber optic sensors that are encased in a polyurethane clamp. With a subsea adhesive, the clamp can be installed by divers in shallow depths or by use of an ROV for deeper applications. The NASA Johnson Space Center was initially involved in the selection and testing of subsea adhesives. It was determined that up to 75 percent of the bonding strength could be achieved with the adhesive from optimal dry bonding versus bonding in submerged sea water environments. The next phase of the study involved the design, fabrication, and testing of several prototype clamps that contained the fiber optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the fabrication of subscale test articles that would accommodate 4-inch and 8-inch diameter pipes. The clamps were installed with adhesive in a "wet" environment on the pipe test articles and tested in the NASA Structures Test Laboratory. The tension/compression and bending tests showed that the prototype sensor clamps achieved good coupling, and could provide high quality strain measurement for active monitoring.
In-flight investigation of shuttle tile pressure orifice installations
NASA Technical Reports Server (NTRS)
Moes, Timothy R.; Meyer, Robert R., Jr.
1990-01-01
To determine shuttle orbiter wing loads during ascent, wing load instrumentation was added to Columbia (OV-102). This instrumentation included strain gages and pressure orifices on the wing. The loads derived from wing pressure measurements taken during STS 61-C did not agree with those derived from strain gage measurements or with the loads predicted from the aerodynamic database. Anomalies in the surface immediately surrounding the pressure orifices in the thermal protection system (TPS) tiles were one possible cause of errors in the loads derived from wing pressure measurements. These surface anomalies were caused by a ceramic filler material which was installed around the pressure tubing. The filler material allowed slight movement of the TPS tile and pressure tube as the airframe flexed and bent under aerodynamic loads during ascent and descent. Postflight inspection revealed that this filler material had protruded from or receeded beneath the surface, causing the orifice to lose its flushness. Flight tests were conducted at NASA Ames Research Center Dryden Flight Research Facility to determine the effects of any anomaly in surface flushness of the orifice installation on the measured pressures at Mach numbers between 0.6 and 1.4. An F-104 aircraft with a flight test fixture mounted beneath the fuselage was used for these flights. Surface flushness anomalies typical of those on the orbiter after flight (STA 61-C) were tested. Also, cases with excessive protrusion and recession of the filler material were tested. This report shows that the anomalies in STS 61-C orifice installations adversely affected the pressure measurements. But the magnitude of the affect was not great enough to account for the discrepancies with the strain gage measurements and the aerodynamic predictions.