Sample records for additional remedial action

  1. 49 CFR 27.11 - Remedial action, voluntary action and compliance planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Remedial action, voluntary action and compliance....11 Remedial action, voluntary action and compliance planning. (a) Remedial action. (1) If the... discrimination not occurred. (b) Voluntary action. A recipient may take steps, in addition to any action that is...

  2. 43 CFR 20.602 - Remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Remedial action. 20.602 Section 20.602... Disciplinary and Remedial Actions § 20.602 Remedial action. (a)(1) Remedial action should normally be.... (2) If the bureau Ethics Counselor decides that remedial action is required, such action shall be...

  3. 49 CFR 805.735-27 - Disciplinary or remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Disciplinary or remedial action. 805.735-27... TRANSPORTATION SAFETY BOARD EMPLOYEE RESPONSIBILITIES AND CONDUCT § 805.735-27 Disciplinary or remedial action... cause for disciplinary action in addition to any penalty prescribed by Federal statute or regulation...

  4. 11 CFR 7.6 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Disciplinary and other remedial action. 7.6... Disciplinary and other remedial action. (a) A violation of this part by an employee or special Commission employee may be cause for appropriate disciplinary action which may be in addition to any penalty...

  5. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...

  6. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...

  7. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...

  8. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...

  9. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Remedial action. 706... RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by an employee or special Government employee may be cause for remedial action. Remedial action may include, but...

  10. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Remedial action. 706... RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by an employee or special Government employee may be cause for remedial action. Remedial action may include, but...

  11. 24 CFR 81.46 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial actions. 81.46 Section 81... FEDERAL HOME LOAN MORTGAGE CORPORATION (FREDDIE MAC) Fair Housing § 81.46 Remedial actions. (a) General. The Secretary shall direct the GSEs to take one or more remedial actions, including suspension...

  12. 45 CFR 77.4 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial actions. 77.4 Section 77.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.4 Remedial actions. If, after the conclusion of the procedures set forth in...

  13. 24 CFR 81.46 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial actions. 81.46 Section 81... FEDERAL HOME LOAN MORTGAGE CORPORATION (FREDDIE MAC) Fair Housing § 81.46 Remedial actions. (a) General. The Secretary shall direct the GSEs to take one or more remedial actions, including suspension...

  14. 45 CFR 77.4 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial actions. 77.4 Section 77.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.4 Remedial actions. If, after the conclusion of the procedures set forth in...

  15. 34 CFR 682.413 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 4 2011-07-01 2011-07-01 false Remedial actions. 682.413 Section 682.413 Education... Federal Family Education Loan Programs by a Guaranty Agency § 682.413 Remedial actions. (a)(1) The... take one or more of the following remedial actions against a guaranty agency or third-party servicer...

  16. 20 CFR 658.704 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Remedial actions. 658.704 Section 658.704... GOVERNING THE JOB SERVICE SYSTEM Federal Application of Remedial Action to State Agencies § 658.704 Remedial actions. (a) If a State agency fails to correct violations as determined pursuant to § 658.702, the...

  17. 20 CFR 658.704 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Remedial actions. 658.704 Section 658.704... GOVERNING THE JOB SERVICE SYSTEM Federal Application of Remedial Action to State Agencies § 658.704 Remedial actions. (a) If a State agency fails to correct violations as determined pursuant to § 658.702, the...

  18. Nuclear facility decommissioning and site remedial actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3)more » Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.« less

  19. 26 CFR 1.141-12 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.141-12 Section 1.141-12...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.141-12 Remedial actions. (a) Conditions to taking remedial action. An action that causes an issue to meet the private business...

  20. 26 CFR 1.141-12 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false Remedial actions. 1.141-12 Section 1.141-12...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.141-12 Remedial actions. (a) Conditions to taking remedial action. An action that causes an issue to meet the private business...

  1. 45 CFR 77.5 - Remedial action procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial action procedures. 77.5 Section 77.5 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.5 Remedial action procedures. Except as provided in § 77.6...

  2. 26 CFR 1.142-2 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.142-2 Section 1.142-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.142-2 Remedial actions... this section and the issuer takes the remedial action described in paragraph (c) of this section. (b...

  3. 26 CFR 1.142-2 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false Remedial actions. 1.142-2 Section 1.142-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.142-2 Remedial actions... this section and the issuer takes the remedial action described in paragraph (c) of this section. (b...

  4. 34 CFR 685.308 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 685.308 Section 685.308 Education... Direct Loan Program Schools § 685.308 Remedial actions. (a) General. The Secretary may require the... fine or take an emergency action against a school or limit, suspend, or terminate a school's...

  5. 34 CFR 685.308 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 4 2011-07-01 2011-07-01 false Remedial actions. 685.308 Section 685.308 Education... Payments for Direct Loan Program Schools § 685.308 Remedial actions. (a) General. The Secretary may require... fine or take an emergency action against a school or limit, suspend, or terminate a school's...

  6. 26 CFR 1.147-2 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.147-2 Section 1.147-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.147-2 Remedial actions. The remedial action rules of § 1.142-2 apply to the rules in section 147 for qualified private...

  7. 26 CFR 1.144-2 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Remedial actions. 1.144-2 Section 1.144-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.144-2 Remedial actions. The remedial action rules of § 1.142-2 apply to qualified small issue bonds issued under section 144(a...

  8. 26 CFR 1.147-2 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false Remedial actions. 1.147-2 Section 1.147-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.147-2 Remedial actions. The remedial action rules of § 1.142-2 apply to the rules in section 147 for qualified private...

  9. 26 CFR 1.144-2 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false Remedial actions. 1.144-2 Section 1.144-2...) INCOME TAXES (CONTINUED) Tax Exemption Requirements for State and Local Bonds § 1.144-2 Remedial actions. The remedial action rules of § 1.142-2 apply to qualified small issue bonds issued under section 144(a...

  10. 34 CFR 682.609 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 682.609 Section 682.609 Education... for Participating Schools § 682.609 Remedial actions. (a) The Secretary may require a school to repay... the United States so requires. (d) The Secretary may impose a fine or take an emergency action against...

  11. 34 CFR 682.609 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 4 2011-07-01 2011-07-01 false Remedial actions. 682.609 Section 682.609 Education... Payments for Participating Schools § 682.609 Remedial actions. (a) The Secretary may require a school to... the United States so requires. (d) The Secretary may impose a fine or take an emergency action against...

  12. 34 CFR 682.413 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 682.413 Section 682.413 Education... Education Loan Programs by a Guaranty Agency § 682.413 Remedial actions. (a)(1) The Secretary requires a... actions against a guaranty agency or third-party servicer administering any aspect of the FFEL programs...

  13. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation of...

  14. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation of...

  15. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation of...

  16. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation of...

  17. 10 CFR 765.31 - Designation of funds available for subsequent remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Designation of funds available for subsequent remedial action. 765.31 Section 765.31 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement Procedures § 765.31 Designation of...

  18. 45 CFR 83.3 - Remedial and affirmative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial and affirmative actions. 83.3 Section 83...; Coverage § 83.3 Remedial and affirmative actions. (a) Remedial action. If the Director finds that an entity... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in a...

  19. 45 CFR 83.3 - Remedial and affirmative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial and affirmative actions. 83.3 Section 83...; Coverage § 83.3 Remedial and affirmative actions. (a) Remedial action. If the Director finds that an entity... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in a...

  20. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has discriminated...

  1. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has discriminated...

  2. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by an...

  3. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by an...

  4. 18 CFR 706.103 - Remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Remedial action. 706.103 Section 706.103 Conservation of Power and Water Resources WATER RESOURCES COUNCIL EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 706.103 Remedial action. (a) A violation of this part by an...

  5. 29 CFR 35.15 - Remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Remedial action. 35.15 Section 35.15 Labor Office of the Secretary of Labor NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL... Remedial action. Even in the absence of a finding of discrimination, a recipient, in administering a...

  6. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... satisfied in full by the licensee, and (2) The total cost of remedial action required at the site, together... at the site, as determined in the approved plan for subsequent remedial action, by the Federal...

  7. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Remedial and affirmative action. 42.724... affirmative action. (a) If the Department finds that, in violation of this subpart, a recipient has discriminated on the basis of age, the recipient shall take remedial action that the Department considers...

  8. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Remedial and affirmative action. 42.724... affirmative action. (a) If the Department finds that, in violation of this subpart, a recipient has discriminated on the basis of age, the recipient shall take remedial action that the Department considers...

  9. 29 CFR 35.39 - Remedial action by recipient.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Enforcement Procedures § 35.39 Remedial action by recipient. Where CRC finds discrimination on the basis of age in violation of this Act or this part, the recipient shall take any remedial action that CRC deems...

  10. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial and affirmative action by recipients. 90..., Conciliation and Enforcement Procedures § 90.49 Remedial and affirmative action by recipients. (a) Where a... remedial action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  11. 45 CFR 90.49 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial and affirmative action by recipients. 90..., Conciliation and Enforcement Procedures § 90.49 Remedial and affirmative action by recipients. (a) Where a... remedial action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative...

  12. 43 CFR 17.337 - Remedial action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Investigation, Conciliation, and Enforcement Procedures § 17.337 Remedial action by recipients. Where DOI finds... DOI may require to overcome the effects of the discrimination. If another recipient exercises control over the recipient that has discriminated, DOI may require both recipients to take remedial action. ...

  13. 43 CFR 17.337 - Remedial action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Investigation, Conciliation, and Enforcement Procedures § 17.337 Remedial action by recipients. Where DOI finds... DOI may require to overcome the effects of the discrimination. If another recipient exercises control over the recipient that has discriminated, DOI may require both recipients to take remedial action. ...

  14. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  15. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self... Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  16. 42 CFR 51.10 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Remedial actions. 51.10 Section 51.10 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS REQUIREMENTS APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Basic Requirements § 51.10 Remedial...

  17. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  18. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Remedial and affirmative action and self... Introduction § 1253.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  19. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Remedial and affirmative action and self... Introduction § 54.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  20. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  1. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... Introduction § 41.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  2. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false Remedial and affirmative action and self... Introduction § 17.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  3. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Remedial and affirmative action and self... Introduction § 1253.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  4. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  5. 40 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Remedial and affirmative action and... Introduction § 5.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  6. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the absence...

  7. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Remedial and affirmative action and self... Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  8. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self... Introduction § 41.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  9. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self... Introduction § 54.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  10. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 1042....110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the designated agency... deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the absence...

  11. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self... Introduction § 17.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  12. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Remedial and affirmative action and self... Introduction § 229.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  13. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Remedial and affirmative action and self... Introduction § 86.3 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the Director... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on...

  14. 45 CFR 86.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... Introduction § 86.3 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the Director... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on...

  15. 42 CFR 51.10 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Remedial actions. 51.10 Section 51.10 Public Health... actions. Failure to submit an annual report in the designated format on time or to submit requested information and documentation, corrective action plans and ongoing implementation status reports in response...

  16. 31 CFR 28.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Remedial and affirmative action and... FINANCIAL ASSISTANCE Introduction § 28.110 Remedial and affirmative action and self-evaluation. (a) Remedial... activity, a recipient may take affirmative action consistent with law to overcome the effects of conditions...

  17. 31 CFR 28.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Remedial and affirmative action and... FINANCIAL ASSISTANCE Introduction § 28.110 Remedial and affirmative action and self-evaluation. (a) Remedial... activity, a recipient may take affirmative action consistent with law to overcome the effects of conditions...

  18. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative action...

  19. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative action...

  20. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  1. 15 CFR 8a.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Remedial and affirmative action and... Introduction § 8a.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the...

  2. 41 CFR 101-8.723 - Remedial action by recipient.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 8-NONDISCRIMINATION IN PROGRAMS RECEIVING FEDERAL FINANCIAL ASSISTANCE 8.7-Discrimination Prohibited on the Basis of Age § 101-8.723 Remedial action... remedial action that GSA may require to overcome the effects of the discrimination. If another recipient...

  3. 41 CFR 101-8.723 - Remedial action by recipient.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 8-NONDISCRIMINATION IN PROGRAMS RECEIVING FEDERAL FINANCIAL ASSISTANCE 8.7-Discrimination Prohibited on the Basis of Age § 101-8.723 Remedial action... remedial action that GSA may require to overcome the effects of the discrimination. If another recipient...

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  5. 49 CFR 1019.6 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Disciplinary and other remedial action. 1019.6... SURFACE TRANSPORTATION BOARD EMPLOYEES § 1019.6 Disciplinary and other remedial action. Any violation of the regulations in this part by an employee shall be cause for appropriate disciplinary or other...

  6. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation in...

  7. 10 CFR 1040.88 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action by recipients. 1040.88... Standards for Determining Age Discrimination § 1040.88 Remedial and affirmative action by recipients. (a... take affirmative action to overcome the effects of conditions that resulted in limited participation in...

  8. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Majormore » chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.« less

  9. 15 CFR 0.735-40 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Disciplinary and other remedial action... RESPONSIBILITIES AND CONDUCT Administration § 0.735-40 Disciplinary and other remedial action. (a) Violation of a requirement established in or pursuant to this part shall be cause for appropriate disciplinary action, which...

  10. 47 CFR 19.735-107 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Disciplinary and other remedial action. 19.735... RESPONSIBILITIES AND CONDUCT General Provisions § 19.735-107 Disciplinary and other remedial action. (a) A violation of the regulations in this part by an employee may be cause for appropriate disciplinary action...

  11. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Remedial and affirmative action by... 1975, AS AMENDED § 117.6 Remedial and affirmative action by recipients. (a) Where a recipient is found...) Even in the absence of a finding of discrimination, a recipient may take affirmative action to overcome...

  12. 13 CFR 117.6 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Remedial and affirmative action by... 1975, AS AMENDED § 117.6 Remedial and affirmative action by recipients. (a) Where a recipient is found...) Even in the absence of a finding of discrimination, a recipient may take affirmative action to overcome...

  13. 38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a...-evaluation. (1) A recipient shall, within one year of the effective date of this part: (i) Evaluate with the...

  14. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROHIBITION OF DISCRIMINATION AGAINST THE HANDICAPPED IN FEDERALLY ASSISTED PROGRAMS OPERATED BY THE... handicapped individuals, appropriate remedial steps to eliminate the effects of any discrimination that... of handicap in violation of section 504 or this part, the recipient shall take such remedial action...

  15. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROHIBITION OF DISCRIMINATION AGAINST THE HANDICAPPED IN FEDERALLY ASSISTED PROGRAMS OPERATED BY THE... handicapped individuals, appropriate remedial steps to eliminate the effects of any discrimination that... of handicap in violation of section 504 or this part, the recipient shall take such remedial action...

  16. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROHIBITION OF DISCRIMINATION AGAINST THE HANDICAPPED IN FEDERALLY ASSISTED PROGRAMS OPERATED BY THE... handicapped individuals, appropriate remedial steps to eliminate the effects of any discrimination that... of handicap in violation of section 504 or this part, the recipient shall take such remedial action...

  17. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROHIBITION OF DISCRIMINATION AGAINST THE HANDICAPPED IN FEDERALLY ASSISTED PROGRAMS OPERATED BY THE... handicapped individuals, appropriate remedial steps to eliminate the effects of any discrimination that... of handicap in violation of section 504 or this part, the recipient shall take such remedial action...

  18. 15 CFR 8b.6 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PROHIBITION OF DISCRIMINATION AGAINST THE HANDICAPPED IN FEDERALLY ASSISTED PROGRAMS OPERATED BY THE... handicapped individuals, appropriate remedial steps to eliminate the effects of any discrimination that... of handicap in violation of section 504 or this part, the recipient shall take such remedial action...

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilitiesmore » Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626

  20. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on...

  1. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Remedial and affirmative action and self-evaluation. 36.110... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on...

  2. Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action

    DTIC Science & Technology

    1991-09-30

    4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3

  3. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Remedial action, voluntary action, and self-evaluation. 1170.52 Section 1170.52 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES NONDISCRIMINATION...

  4. 45 CFR 1170.52 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Remedial action, voluntary action, and self-evaluation. 1170.52 Section 1170.52 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES NONDISCRIMINATION...

  5. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a) An...

  6. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a) An...

  7. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a) An...

  8. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a) An...

  9. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Disciplinary and other remedial action. 200.735-104 Section 200.735-104 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION EMPLOYEE RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a) An...

  10. 28 CFR 42.724 - Remedial and affirmative action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 42.724 Judicial Administration DEPARTMENT OF JUSTICE NONDISCRIMINATION; EQUAL EMPLOYMENT... Activities; Implementation of the Age Discrimination Act of 1975 Duties of Recipients § 42.724 Remedial and... discriminated on the basis of age, the recipient shall take remedial action that the Department considers...

  11. 49 CFR 27.11 - Remedial action, voluntary action and compliance planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Remedial action, voluntary action and compliance planning. 27.11 Section 27.11 Transportation Office of the Secretary of Transportation NONDISCRIMINATION ON THE BASIS OF DISABILITY IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General § 27...

  12. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  13. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  14. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Remedial and affirmative action... Receiving Federal Financial Assistance Introduction § 113.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  15. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Remedial and affirmative action and self... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  16. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Remedial and affirmative action and self-evaluation... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 106.3 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  17. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  18. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Remedial and affirmative action and self... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  19. 13 CFR 113.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Remedial and affirmative action... Receiving Federal Financial Assistance Introduction § 113.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  20. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding of...

  1. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Remedial and affirmative action and self... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 2555.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  2. 10 CFR 1040.7 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 1040... ASSISTED PROGRAMS OR ACTIVITIES General Provisions § 1040.7 Remedial and affirmative action and self... to overcome the effects of the discrimination. (b) Affirmative action. In the absence of a finding of...

  3. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Remedial and affirmative action and self-evaluation... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 106.3 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  4. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Introduction § 101-4.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the... recipient may take affirmative action consistent with law to overcome the effects of conditions that...

  5. 41 CFR 101-4.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Introduction § 101-4.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the... official deems necessary to overcome the effects of such discrimination. (b) Affirmative action. In the... recipient may take affirmative action consistent with law to overcome the effects of conditions that...

  6. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.« less

  7. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uraniummore » Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.« less

  8. 43 CFR 20.603 - Appealing an order for remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... made a decision on the issue or on the order for remedial action. (2) The Deputy Agency Ethics Official...) Where to appeal. (1) Orders for remedial action issued by an Ethics Counselor may be appealed to the... Secretary selected by the Designated Agency Ethics Official; (B) The Associate Solicitor or the Deputy...

  9. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation... affirmative action and self-evaluation. (a) Remedial action. If the Secretary finds that a recipient has.... (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less

  11. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... against persons on the basis of handicap in violation of section 504 or this part, the recipient shall... discrimination. (2) Where a recipient is found to have discriminated against persons on the basis of handicap in...

  12. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... against persons on the basis of handicap in violation of section 504 or this part, the recipient shall... discrimination. (2) Where a recipient is found to have discriminated against persons on the basis of handicap in...

  13. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... against persons on the basis of handicap in violation of section 504 or this part, the recipient shall... discrimination. (2) Where a recipient is found to have discriminated against persons on the basis of handicap in...

  14. 14 CFR 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary action, and self... against persons on the basis of handicap in violation of section 504 or this part, the recipient shall... discrimination. (2) Where a recipient is found to have discriminated against persons on the basis of handicap in...

  15. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  16. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  17. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... differences when the differences in the remedial or enforcement action, settlement, or consent decree..., performance, or cost. To issue an explanation of significant differences, the lead agency shall: (A) Make the explanation of significant differences and supporting information available to the public in the...

  18. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... differences when the differences in the remedial or enforcement action, settlement, or consent decree..., performance, or cost. To issue an explanation of significant differences, the lead agency shall: (A) Make the explanation of significant differences and supporting information available to the public in the...

  19. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... differences when the differences in the remedial or enforcement action, settlement, or consent decree..., performance, or cost. To issue an explanation of significant differences, the lead agency shall: (A) Make the explanation of significant differences and supporting information available to the public in the...

  20. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... differences when the differences in the remedial or enforcement action, settlement, or consent decree..., performance, or cost. To issue an explanation of significant differences, the lead agency shall: (A) Make the explanation of significant differences and supporting information available to the public in the...

  1. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... differences when the differences in the remedial or enforcement action, settlement, or consent decree..., performance, or cost. To issue an explanation of significant differences, the lead agency shall: (A) Make the explanation of significant differences and supporting information available to the public in the...

  2. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  3. 49 CFR 228.333 - Remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.333 Remedial action. A railroad shall, within 24 hours after receiving a good faith notice from a camp car occupant or an employee labor organization representing camp car occupants or notice from a Federal...

  4. 49 CFR 228.333 - Remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.333 Remedial action. A railroad shall, within 24 hours after receiving a good faith notice from a camp car occupant or an employee labor organization representing camp car occupants or notice from a Federal...

  5. 49 CFR 228.333 - Remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... QUARTERS Safety and Health Requirements for Camp Cars Provided by Railroads as Sleeping Quarters § 228.333 Remedial action. A railroad shall, within 24 hours after receiving a good faith notice from a camp car occupant or an employee labor organization representing camp car occupants or notice from a Federal...

  6. 36 CFR 905.735-108 - Remedial and disciplinary action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DEVELOPMENT CORPORATION STANDARDS OF CONDUCT General Provisions § 905.735-108 Remedial and disciplinary action... assignment; (3) Changes in the assigned duties of the individual; or (4) Disciplinary action. (b) Where the situation warrants some form of disciplinary action, the Chairman may choose from a wide range including a...

  7. 20 CFR 658.704 - Remedial actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... specific operating systems or procedures for a specified time; (4) Requirement of special training for... PROVISIONS GOVERNING THE JOB SERVICE SYSTEM Federal Application of Remedial Action to State Agencies § 658... seq.) or the JS complaint system (20 CFR 658.400 et seq.), a copy of said notice shall be sent to the...

  8. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise to...

  9. 45 CFR 77.3 - Conditions that may give rise to remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Conditions that may give rise to remedial actions. 77.3 Section 77.3 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REMEDIAL ACTIONS APPLICABLE TO LETTER OF CREDIT ADMINISTRATION § 77.3 Conditions that may give rise to...

  10. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as themore » Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.« less

  11. 31 CFR 50.80 - Federal cause of action and remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) of this section shall exist only for causes of action for property damage, personal injury, or death... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Federal cause of action and remedy... RISK INSURANCE PROGRAM Federal Cause of Action; Approval of Settlements § 50.80 Federal cause of action...

  12. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  13. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  14. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  15. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  16. Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barber, Brenda; Honerlah, Hans; O'Neill, Mike

    2012-07-01

    Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineersmore » (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmentalmore » restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.« less

  18. 10 CFR 4.338 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Remedial and affirmative action by recipients. 4.338... and affirmative action by recipients. (a) Where NRC finds a recipient has discriminated on the basis... discrimination, a recipient may take affirmative action to overcome the effects of conditions that resulted in...

  19. 10 CFR 4.338 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Remedial and affirmative action by recipients. 4.338... and affirmative action by recipients. (a) Where NRC finds a recipient has discriminated on the basis... discrimination, a recipient may take affirmative action to overcome the effects of conditions that resulted in...

  20. Remedial action assessment system: Decision support for environmental cleanup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennock, K.A.; Bohn, S.; Franklin, A.L.

    1991-11-01

    A large number of hazardous waste sites across the United States await treatment. Waste sites can be physically complex entities composed of multiple, possibly interacting contaminants distributed throughout one or more media. The sites may be active as well with contaminants escaping through one or more potential escape paths. Treatment of these sites requires a long and costly commitment involving the coordination of activities among several waste treatment professionals. In order to reduce the cost and time required for the specification of treatment at these waste sites. The Remedial Action Assessment System (RAAS) was proposed. RAAS is an automated informationmore » management system which utilizes a combination of expert reasoning and numerical models to produce the combinations of treatment technologies, known as treatment trains, which satisfy the treatment objectives of a particular site. In addition, RAAS supports the analysis of these trains with regard to effectiveness and cost so that the viable treatment trains can be measured against each other. The Remedial Action Assessment System is a hybrid system designed and constructed using object-oriented tools and techniques. RAAS is advertised as a hybrid system because it combines, in integral fashion, numerical computing (primarily quantitative models) with expert system reasoning. An object-oriented approach was selected due to many of its inherent advantages, among these the naturalness of modeling physical objects and processes.« less

  1. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action...

  2. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action...

  3. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action...

  4. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a... effects of such discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action...

  5. 17 CFR 200.735-13 - Disciplinary and other remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... conflicting interest; (3) disciplinary action; or (4) disqualification for a particular assignment. Remedial action, whether disciplinary or otherwise, shall be effected in accordance with any applicable laws... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Disciplinary and other...

  6. Proposed RCRA Permit Decision for CNMI Remedial Action Plan

    EPA Pesticide Factsheets

    EPA requesting public comment on its proposed Remedial Action Plan permit decision for the detonation unit and storage cave located at Marpi Point, Saipan, approximately 1 mile north of the new Marpi Landfill.

  7. 14 CFR § 1251.105 - Remedial action, voluntary action, and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATION NONDISCRIMINATION ON BASIS OF HANDICAP General Provisions § 1251.105 Remedial action, voluntary... recipient has discriminated against persons on the basis of handicap in violation of section 504 or this... persons on the basis of handicap in violation of section 504 or this part and where another recipient...

  8. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... affirmative action and self-evaluation. 1317.110 Section 1317.110 Conservation of Power and Water Resources... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1317.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  9. 18 CFR 1317.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... affirmative action and self-evaluation. 1317.110 Section 1317.110 Conservation of Power and Water Resources... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1317.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  10. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 23.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action consistent with law to overcome the...

  11. 38 CFR 23.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 23.110 Remedial and affirmative action and self... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an education program or activity, a recipient may take affirmative action consistent with law to overcome the...

  12. 24 CFR 954.601 - Corrective and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT INDIAN HOME PROGRAM Performance Reviews and Sanctions § 954.601 Corrective and remedial actions. (a) General. HUD will use the procedures in this section in conducting the performance... preclude the further expenditure of funds for activities affected by the failure to comply. (b) Performance...

  13. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...

  14. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...

  15. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  16. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  17. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  18. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  19. 24 CFR 115.307 - Requirements for participation in the FHAP; Corrective and remedial action for failing to comply...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...

  20. 24 CFR 92.551 - Corrective and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM Performance Reviews and Sanctions § 92.551... performance review as provided in § 92.550 and in taking corrective and remedial actions. (b) Performance... for a performance deficiency (failure to meet a provision of this part) will be designed to prevent a...

  1. Dynamic remedial action scheme using online transient stability analysis

    NASA Astrophysics Data System (ADS)

    Shrestha, Arun

    Economic pressure and environmental factors have forced the modern power systems to operate closer to their stability limits. However, maintaining transient stability is a fundamental requirement for the operation of interconnected power systems. In North America, power systems are planned and operated to withstand the loss of any single or multiple elements without violating North American Electric Reliability Corporation (NERC) system performance criteria. For a contingency resulting in the loss of multiple elements (Category C), emergency transient stability controls may be necessary to stabilize the power system. Emergency control is designed to sense abnormal conditions and subsequently take pre-determined remedial actions to prevent instability. Commonly known as either Remedial Action Schemes (RAS) or as Special/System Protection Schemes (SPS), these emergency control approaches have been extensively adopted by utilities. RAS are designed to address specific problems, e.g. to increase power transfer, to provide reactive support, to address generator instability, to limit thermal overloads, etc. Possible remedial actions include generator tripping, load shedding, capacitor and reactor switching, static VAR control, etc. Among various RAS types, generation shedding is the most effective and widely used emergency control means for maintaining system stability. In this dissertation, an optimal power flow (OPF)-based generation-shedding RAS is proposed. This scheme uses online transient stability calculation and generator cost function to determine appropriate remedial actions. For transient stability calculation, SIngle Machine Equivalent (SIME) technique is used, which reduces the multimachine power system model to a One-Machine Infinite Bus (OMIB) equivalent and identifies critical machines. Unlike conventional RAS, which are designed using offline simulations, online stability calculations make the proposed RAS dynamic and adapting to any power system

  2. Remedial Action Assessment System: A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.K.; Buelt, J.L.; Stottlemyre, J.A.

    1991-02-01

    Because of the complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process. The Remedial Action Assessment System (RAAS), can be used for screening, linking, and evaluating established technology processes in support of conducting feasibility studies. It is also intended to do the same in support of corrective measures studies. The user interface employs menus, windows, help features, and graphical information while RAAS is in operation. Object-oriented programming is used to link unit processes into sets ofmore » compatible processes that form appropriate remedial alternatives. Once the remedial alternatives are formed, the RAAS methodology can evaluate them in terms of effectiveness, implementability, and cost. RAAS will access a user-selected risk assessment code to determine the reduction of risk after remedial action by each recommended alternative. The methodology will also help determine the implementability of the remedial alternatives at a site and access cost estimating tools to provide estimates of capital, operating, and maintenance costs. This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses graphical, tabular and textual information about technologies, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  3. 31 CFR 50.80 - Federal cause of action and remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Federal cause of action and remedy. 50.80 Section 50.80 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM... 102 of the Act, there shall exist a Federal cause of action for property damage, personal injury, or...

  4. 31 CFR 50.80 - Federal cause of action and remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Federal cause of action and remedy. 50.80 Section 50.80 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM... 102 of the Act, there shall exist a Federal cause of action for property damage, personal injury, or...

  5. 31 CFR 50.80 - Federal cause of action and remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Federal cause of action and remedy. 50.80 Section 50.80 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM... 102 of the Act, there shall exist a Federal cause of action for property damage, personal injury, or...

  6. 31 CFR 50.80 - Federal cause of action and remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Federal cause of action and remedy. 50.80 Section 50.80 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM... 102 of the Act, there shall exist a Federal cause of action for property damage, personal injury, or...

  7. Generic radiological characterization protocol for surveys conducted for DOE remedial action programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berven, B.A.; Cottrell, W.D.; Leggett, R.W.

    1986-05-01

    This report describes goals and methodology that can be used by radiological survey contractors in surveys at properties associated with the Department of Energy's remedial action programs. The description includes: (1) a general discussion of the history of the remedial action programs; (2) the types of surveys that may be employed by the Radiological Survey Activities (RASA) contractor; (3) generic survey methods that may be used during radiological surveys; and (4) a format for presenting information and data in a survey report. 9 refs.

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedialmore » Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.« less

  9. Retrospection of Chernobyl nuclear accident for decision analysis concerning remedial actions in Ukraine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Georgievskiy, Vladimir

    2007-07-01

    It is considered the efficacy of decisions concerning remedial actions when of-site radiological monitoring in the early and (or) in the intermediate phases was absent or was not informative. There are examples of such situations in the former Soviet Union where many people have been exposed: releases of radioactive materials from 'Krasnoyarsk-26' into Enisey River, releases of radioactive materials from 'Chelabinsk-65' (the Kishtim accident), nuclear tests at the Semipalatinsk Test Site, the Chernobyl nuclear accident etc. If monitoring in the early and (or) in the intermediate phases is absent the decisions concerning remedial actions are usually developed on the basemore » of permanent monitoring. However decisions of this kind may be essentially erroneous. For these cases it is proposed to make retrospection of radiological data of the early and intermediate phases of nuclear accident and to project decisions concerning remedial actions on the base of both retrospective data and permanent monitoring data. In this Report the indicated problem is considered by the example of the Chernobyl accident for Ukraine. Their of-site radiological monitoring in the early and intermediate phases was unsatisfactory. In particular, the pasture-cow-milk monitoring had not been made. All official decisions concerning dose estimations had been made on the base of measurements of {sup 137}Cs in body (40 measurements in 135 days and 55 measurements in 229 days after the Chernobyl accident). For the retrospection of radiological data of the Chernobyl accident dynamic model has been developed. This model has structure similar to the structure of Pathway model and Farmland model. Parameters of the developed model have been identified for agricultural conditions of Russia and Ukraine. By means of this model dynamics of 20 radionuclides in pathways and dynamics of doses have been estimated for the early, intermediate and late phases of the Chernobyl accident. The main results are

  10. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook seriesmore » contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.« less

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions;more » (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.« less

  12. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  13. Remedial Action Plan for Deer Lake Area of Concern, 1987

    EPA Pesticide Factsheets

    Stage I document details Deer Lake’s history of mercury and other contamination, and describes sources of pollution and future remedial actions, to address beneficial use impairments identified by the Great Lakes Water Quality Board (WQB).

  14. 12 CFR 24.7 - Examination, records, and remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Examination, records, and remedial action. 24.7 Section 24.7 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY COMMUNITY AND ECONOMIC DEVELOPMENT ENTITIES, COMMUNITY DEVELOPMENT PROJECTS, AND OTHER PUBLIC WELFARE INVESTMENTS § 24.7...

  15. EPA/Navy CERCLA Remedial Action Technology Guide

    DTIC Science & Technology

    1993-11-01

    Pollution 18:25-36, 1988. Control Association, August 19-21, 1985. 11. Nirmalakhandan, N. N. and R. E. Speece. QSAR Model for Predicting Henry’s...Las Vegas , Nevada. May 1988.. 6. Bergstrom, Wayne R., Gray, Donald H. Fly Ash Utilization 12. Handbook - Remedial Action at Waste Disposal Sites in...of the soil piles should be are needed to confirm that the contaminants of concern can be designed as a package. There are computer models available

  16. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self...

  17. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self...

  18. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) NATIONAL SCIENCE FOUNDATION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 618.110 Remedial and affirmative action and self...

  19. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  20. Results of the independent verification of radiological remedial action at 87 East 500 South Street, Monticello, Utah (MS00153)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the iste of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1987 and 1988, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 87 East 500 South Street, Monticello, Utah. The Pollutantmore » Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less

  1. The Department of Energy`s Remedial Action Assessment System (RAAS): Decision support tools for performing streamlined feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.K.

    1994-06-01

    The United States Department of Energy (DOE) faces the major task of cleaning up hundreds of waste sites across the nation, which will require completion of a large number of remedial investigation/feasibility studies (RI/FSs). The intent of each RI/FS is to characterize the waste problems and environmental conditions at the operable unit level, segment the remediation problem into manageable medium-specific and contaminant-specific pieces, define corresponding remediation objectives, and identify remedial response actions to satisfy those objectives. The RI/FS team can then identify combinations of remediation technologies that will meet the remediation objectives. Finally, the team must evaluate these remedial alternativesmore » in terms of effectiveness, implementability, cost, and acceptability. The Remedial Action Assessment System (RAAS) is being developed by Pacific Northwest Laboratory (PNL) to support DOE in this effort.« less

  2. Overview of technology modeling in the Remedial Action Assessment System (RAAS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, C.D.; Bagaasen, L.M.; Chan, T.C.

    1994-08-01

    There are numerous hazardous waste sites under the jurisdiction of the US Department of Energy (DOE). To assist the cleanup of these sites in a more consistent, timely, and cost-effective manner, the Remedial Action Assessment System (RAAS) is being developed by the Pacific Northwest Laboratory (PNL). RAAS is a software tool designed to automate the initial technology selection within the remedial investigation/feasibility study (RI/FS) process. The software does several things for the user: (1) provides information about available remedial technologies, (2) sorts possible technologies to recommend a list of technologies applicable to a given site, (3) points out technical issuesmore » that may prevent the implementation of a technology, and (4) provides an estimate of the effectiveness of a given technology at a particular site. Information from RAAS can be used to compare remediation options and guide selection of technologies for further study.« less

  3. 24 CFR 572.225 - Grant agreements; corrective and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES HOPE FOR HOMEOWNERSHIP OF SINGLE FAMILY HOMES PROGRAM (HOPE 3) Grants § 572.225 Grant agreements; corrective and remedial actions. (a) Terms and... not incurring further costs for the affected activities; (iv) Reimbursing its HOPE 3 program account...

  4. Results of the independent verification of radiological remedial action at 397 East 3rd South Street, Monticello, Utah (MS00168)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1987 and 1988, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 397 East 3rd South Street, Monticello, Utah. The Pollutantmore » Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less

  5. Results of the independent verification of radiological remedial action at 464 South 1st East Street, Monticello, Utah (MS00071)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986 and 1987, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 464 South 1st East Street, Monticello, Utah. The Pollutantmore » Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less

  6. Results of the independent verification of radiological remedial action at 16 East 5th South Street, Monticello, Utah (MS00075)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984 UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 16 East 5th South Street, Monticello, Utah. The Pollutant Assessments Groupmore » (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less

  7. Quantitative evaluation of intensive remedial action using long-term monitoring and tracer data at a DNAPL contaminated site, Wonju, Korea

    NASA Astrophysics Data System (ADS)

    Lee, S. S.; Kim, H. J.; Kim, M. O.; Lee, K.; Lee, K. K.

    2016-12-01

    A study finding evidence of remediation represented on monitoring data before and after in site intensive remedial action was performed with various quantitative evaluation methods such as mass discharge analysis, tracer data, statistical trend analysis, and analytical solutions at DNAPL contaminated site, Wonju, Korea. Remediation technologies such as soil vapor extraction, soil flushing, biostimulation, and pump-and-treat have been applied to eliminate the contaminant sources of trichloroethylene (TCE) and to prevent the migration of TCE plume from remediation target zones. Prior to the remediation action, the concentration and mass discharges of TCE at all transects were affected by seasonal recharge variation and residual DNAPLs sources. After the remediation, the effect of remediation took place clearly at the main source zone and industrial complex. By tracing a time-series of plume evolution, a greater variation in the TCE concentrations was detected at the plumes near the source zones compared to the relatively stable plumes in the downstream. The removal amount of the residual source mass during the intensive remedial action was estimated to evaluate the efficiency of the intensive remedial action using analytical solution. From results of quantitative evaluation using analytical solution, it is assessed that the intensive remedial action had effectively performed with removal efficiency of 70% for the residual source mass during the remediation period. Analytical solution which can consider and quantify the impacts of partial mass reduction have been proven to be useful tools for quantifying unknown contaminant source mass and verifying dissolved concentration at the DNAPL contaminated site and evaluating the efficiency of remediation using long-term monitoring data. Acknowledgement : This subject was supported by the Korea Ministry of Environment under "GAIA project (173-092-009) and (201400540010)", R&D Project on Enviornmental Management of Geologic CO

  8. Phytoremediation and innovative strategies for specialized remedial actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, B.C.; Leeson, A.

    1999-01-01

    Phytoremediation is a site remediation strategy whose time seems to have come in the past few years, with field implementations taking place in a host of applications. From laboratory studies on plant uptake to full-scale phytoremediation treatment strategies, this volume covers the use of plants to treat contaminants such as hydrocarbons, metals, pesticides, perchlorate, and chlorinated solvents. In addition to the phytoremediation studies, this volume also covers specialized remediation approaches such as sequential anaerobic/aerobic in situ treatment, membrane bioreactors, and Fenton's reagent oxidation.

  9. Phytoremediation and innovative strategies for specialized remedial actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, B.C.; Leeson, A.

    1999-11-01

    Phytoremediation is a site remediation strategy whose time seems to have come in the past few years, with field implementations taking place in a host of applications. From laboratory studies on plant uptake to full-scale phytoremediation treatment strategies, this volume covers the use of plants to treat contaminants such as hydrocarbons, metals, pesticides, perchlorate, and chlorinated solvents. In addition to the phytoremediation studies, this volume also covers specialized remediation approaches such as sequential anaerobic/aerobic in situ treatment, membrane bioreactors, and Fenton`s reagent oxidation.

  10. 78 FR 21352 - Update on Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... DEPARTMENT OF ENERGY Update on Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites AGENCY: Department of Energy. ACTION: Notice of the Title X claims during fiscal... at active uranium and thorium processing sites to remediate byproduct material generated as an...

  11. 36 CFR 223.198 - Administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Administrative remedies. 223.198 Section 223.198 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE... Act of 1990 Program § 223.198 Administrative remedies. In addition to possible debarment action...

  12. 36 CFR 223.198 - Administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Administrative remedies. 223.198 Section 223.198 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE... remedies. In addition to possible debarment action provided under subpart C of this part, the Chief of the...

  13. Object reasoning for waste remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennock, K.A.; Bohn, S.J.; Franklin, A.L.

    1991-08-01

    A large number of contaminated waste sites across the United States await size remediation efforts. These sites can be physically complex, composed of multiple, possibly interacting, contaminants distributed throughout one or more media. The Remedial Action Assessment System (RAAS) is being designed and developed to support decisions concerning the selection of remediation alternatives. The goal of this system is to broaden the consideration of remediation alternatives, while reducing the time and cost of making these considerations. The Remedial Action Assessment System is a hybrid system, designed and constructed using object-oriented, knowledge- based systems, and structured programming techniques. RAAS uses amore » combination of quantitative and qualitative reasoning to consider and suggest remediation alternatives. The reasoning process that drives this application is centered around an object-oriented organization of remediation technology information. This paper describes the information structure and organization used to support this reasoning process. In addition, the paper describes the level of detail of the technology related information used in RAAS, discusses required assumptions and procedural implications of these assumptions, and provides rationale for structuring RAAS in this manner. 3 refs., 3 figs.« less

  14. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodatemore » the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.« less

  15. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Remedial and affirmative action and self-evaluation. 196.110 Section 196.110 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS...

  16. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Remedial and affirmative action and self-evaluation. 196.110 Section 196.110 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS...

  17. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self-evaluation. 196.110 Section 196.110 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS...

  18. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Remedial and affirmative action and self-evaluation. 196.110 Section 196.110 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS...

  19. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Remedial and affirmative action and self-evaluation. 196.110 Section 196.110 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS...

  20. Decontamination formulation with additive for enhanced mold remediation

    DOEpatents

    Tucker, Mark D [Albuquerque, NM; Irvine, Kevin [Huntsville, AL; Berger, Paul [Rome, NY; Comstock, Robert [Bel Air, MD

    2010-02-16

    Decontamination formulations with an additive for enhancing mold remediation. The formulations include a solubilizing agent (e.g., a cationic surfactant), a reactive compound (e.g., hydrogen peroxide), a carbonate or bicarbonate salt, a water-soluble bleaching activator (e.g., propylene glycol diacetate or glycerol diacetate), a mold remediation enhancer containing Fe or Mn, and water. The concentration of Fe.sup.2+ or Mn.sup.2+ ions in the aqueous mixture is in the range of about 0.0001% to about 0.001%. The enhanced formulations can be delivered, for example, as a foam, spray, liquid, fog, mist, or aerosol for neutralization of chemical compounds, and for killing certain biological compounds or agents and mold spores, on contaminated surfaces and materials.

  1. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardy, A.J.; Redmond, J.V.; River, R.A.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less

  2. A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitra, Joydeep; Ben-Idris, Mohammed; Faruque, Omar

    This report summarizes the outcome of a research project that comprised the development of a Lyapunov function based remedial action screening tool using real-time data (L-RAS). The L-RAS is an advanced computational tool that is intended to assist system operators in making real-time redispatch decisions to preserve power grid stability. The tool relies on screening contingencies using a homotopy method based on Lyapunov functions to avoid, to the extent possible, the use of time domain simulations. This enables transient stability evaluation at real-time speed without the use of massively parallel computational resources. The project combined the following components. 1. Developmentmore » of a methodology for contingency screening using a homotopy method based on Lyapunov functions and real-time data. 2. Development of a methodology for recommending remedial actions based on the screening results. 3. Development of a visualization and operator interaction interface. 4. Testing of screening tool, validation of control actions, and demonstration of project outcomes on a representative real system simulated on a Real-Time Digital Simulator (RTDS) cluster. The project was led by Michigan State University (MSU), where the theoretical models including homotopy-based screening, trajectory correction using real-time data, and remedial action were developed and implemented in the form of research-grade software. Los Alamos National Laboratory (LANL) contributed to the development of energy margin sensitivity dynamics, which constituted a part of the remedial action portfolio. Florida State University (FSU) and Southern California Edison (SCE) developed a model of the SCE system that was implemented on FSU's RTDS cluster to simulate real-time data that was streamed over the internet to MSU where the L-RAS tool was executed and remedial actions were communicated back to FSU to execute stabilizing controls on the simulated system. LCG Consulting developed the visualization

  3. 76 FR 30696 - Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-26

    ... DEPARTMENT OF ENERGY Reimbursement for Costs of Remedial Action at Active Uranium and Thorium...) acceptance of claims in FY 2011 from eligible active uranium and thorium processing site licensees for... incurred by licensees at active uranium and thorium processing sites to remediate byproduct material...

  4. Clarification to 1998 Agreement Regarding the National Remedy Review Board Review Criteria for Department of Energy Non-Time Critical Removal Actions

    EPA Pesticide Factsheets

    The purpose of this memorandum is to provide additional clarification on the applicability of the October 5, 1998, joint Environmental Protection Agency (EPA) and the Department of Energy (DOE) agreement on DOE decommissioning projects titled Review of Department of Energy Non-Time Critical Removal Actions by the National Remedy Review Board.

  5. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... personnel working in connection with the recipient's education program or activity; (2) Modify any of these...

  6. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... personnel working in connection with the recipient's education program or activity; (2) Modify any of these...

  7. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... personnel working in connection with the recipient's education program or activity; (2) Modify any of these...

  8. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... personnel working in connection with the recipient's education program or activity; (2) Modify any of these...

  9. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... personnel working in connection with the recipient's education program or activity; (2) Modify any of these...

  10. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  11. Expedited Remedial Action Program (SB 923): A California Brownfields initiative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cambridge, M.; Wolfenden, A.K.

    California`s Expedited Remedial Action Program (ERAP) created a comprehensive program that promotes an equitable and expedited approach for redevelopment of properties contaminated with hazardous substances. This bill embodies an emerging trend in environmental policy that permits flexibility, cooperation and creativity without compromising protection to public health or the environment. Within the California Environmental Protection Agency, the Department of Toxic Substances Control (DTSC) is promoting a number of programs to facilitate the restoration of contaminated properties as part of its Brownfields initiative. ERAP represents a potentially more efficient process to remediate sites by minimizing economic risks through a clearly identified liabilitymore » scheme, indemnifying future owners through a covenant not to sue, and providing risk based cleanups that are based on the permanent use of the site.« less

  12. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  13. Arsenic Remediation Enhancement Through Chemical Additions to Pump and Treat Operations

    NASA Astrophysics Data System (ADS)

    Wovkulich, K.; Mailloux, B. J.; Stute, M.; Simpson, H. J.; Keimowitz, A. R.; Powell, A.; Lacko, A.; Chillrud, S. N.

    2008-12-01

    Arsenic is a contaminant found at more than 500 US Superfund sites. Since pump and treat technologies are widely used for remediation of contaminated groundwater, increasing the efficiency of contaminant removal at such sites should allow limited financial resources to clean up more sites. The Vineland Chemical Company Superfund site is extensively contaminated with arsenic after waste arsenic salts were stored and disposed of improperly for much of the company's 44 year manufacturing lifetime. Despite approximately eight years of pump and treat remediation, arsenic concentrations in the recovery wells can still be greater than 1000 ppb. The arsenic concentrations in the groundwater remain high because of slow desorption of arsenic from contaminated aquifer solids. Extrapolation of laboratory column experiments suggest that continuing the current groundwater remediation practice based on flushing ambient groundwater through the system may require on the order of hundreds of years to clean the site. However, chemical additions of phosphate or oxalic acid into the aquifer could decrease the remediation time scale substantially. Laboratory results from a soil column experiment using input of 10 mM oxalic acid suggest that site clean up of groundwater could be decreased to as little as four years. Pilot scale forced gradient field experiments will help establish whether chemical additions can be effective for increasing arsenic mobilization from aquifer solids and thus substantially decrease pump and treat clean up time.

  14. Results of the independent verification of radiological remedial action at 600 South Clayhill Drive (AKA 600 South Cemetery Road), Monticello, Utah (MS00145)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986 and 1987, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 600 South Cemetery Road (updated by San Juan Countymore » and the state of Utah to 600 South Clayhill Drive), Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less

  15. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program - 12184

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken

    2012-07-01

    The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequatelymore » described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive

  16. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural

  17. "We're Trying to Take Action": Transformative Agency, Role Re-Mediation, and the Complexities of Youth Participatory Action Research

    ERIC Educational Resources Information Center

    Bertrand, Melanie; Durand, E. Sybil; Gonzalez, Taucia

    2017-01-01

    This article seeks to illuminate the complexity of youth participatory action research (YPAR) through the use of two concepts: (1) transformative agency, a collective initiative to address conflicts and contradictions in activity systems, and (2) role re-mediation, the disruption of power relations. We demonstrate that these concepts, in…

  18. Remedial action suitability for the Cornhusker Army Ammunition Plant site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nonavinakere, S.; Rappa, P. III

    1995-12-31

    Numerous Department of Defense (DOD) sites across the nation are contaminated with explosive wastes due to munitions production during World War II, Korean Conflict and Vietnam Conflict. Production activities included explosives manufacturing, loading, packing, assembling, machining, casting and curing. Contaminants often present at these sites include TNT, RDX, HMX, Tetryl 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-TNB and nitrobenzene. The Cornhusker Army Ammunition Plant (CAAP) is one such DOD site that has been determined to be contaminated with explosives. The CAAP is located approximately 2 miles west of the City of Grand Island in Hall County, Nebraska. The plant produced artillery, bombs, boosters,more » supplementary charges and various other experimental explosives. The purpose of this paper is to provide an overview of the site background, review of the remedial alternatives evaluation process and rationale behind the selection of present remedial action.« less

  19. Superfund Record of Decision (EPA Region 4): Ciba-Geigy, Washington County, Mcintosh, AL. (Second remedial action), September 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-30

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. From 1952 to present, Ciba-Geigy, formerly Geigy Chemical Corporation, has produced various chemicals including DDT, laundry products, herbicides, insecticides, agricultural chelating agents, sequestering agents, plastic resins and additives, antioxidants, and specialty chemicals. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. In 1987, as part of the corrective action plan requirements, Ciba-Geigy installed an additional wastewater treatment system and ground water monitoring wells.more » The ROD addresses highly contaminated soil and sludge at 10 of the 11 former waste management areas as OU2. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs including benzene and toluene; other organics including PCBs and pesticides (e.g., DDT); and metals including lead. The selected remedial action for the site is included.« less

  20. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards formore » th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.« less

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  2. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...

  3. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...

  4. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...

  5. Superfund Record of Decision (EPA Region 5): Novaco Industries, MI. (First remedial action), (Amendment), September 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 2.6-acre Novaco Industries site is a one building site in Temperance, Michigan. Land use in the area is predominantly residential and agricultural. The estimated 85 residences located within 1/2 mile of the site use the underlying sand/gravel and limestone aquifer as their drinking water supply. A 1986 Record of Decision (ROD) addressed a final remedy for ground water contamination and provided for ground water pumping and treatment using electrochemical reduction/ion exchange polishing, followed by onsite discharge to surface water. The ROD amends the 1986 ROD. The amended remedial action for the site is no further action.

  6. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bachrach, A.; Hoopes, J.; Morycz, D.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less

  7. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Under what circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY NONDISCRIMINATION WITH RESPECT TO AGE § 1309.18 Under...

  8. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Under what circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY NONDISCRIMINATION WITH RESPECT TO AGE § 1309.18 Under...

  9. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Under what circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY NONDISCRIMINATION WITH RESPECT TO AGE § 1309.18 Under what...

  10. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Under what circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY NONDISCRIMINATION WITH RESPECT TO AGE § 1309.18 Under...

  11. 18 CFR 1309.18 - Under what circumstances must recipients take remedial or affirmative action?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Under what circumstances must recipients take remedial or affirmative action? 1309.18 Section 1309.18 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY NONDISCRIMINATION WITH RESPECT TO AGE § 1309.18 Under...

  12. Transboundary movement of hazardous wastes into Lebanon: Part 2. Environmental impacts and the need for remedial actions.

    PubMed

    Jurdi, Mey

    2002-01-01

    This paper discusses the transboundary movement of hazardous wastes (the "silent trade") into Lebanon in terms of environmental impacts and remedial actions. It highlights the projected impacts on potable-water quality, the exposure of the groundwater aquifer, and the status of quality control programs. The public responses to these problems are presented and characterized in terms of mistrust and rejection. The constraints developing countries face in handling environmental impacts and undertaking remedial actions are emphasized. The vision derived from the decade covered (1990-2000) emphasizes the need for international collaboration, through Basel Convention efforts, to control the transboundary movement of hazardous wastes and the disposal of such wastes. The need for "global harmonization" should be given serious consideration.

  13. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  14. Ethical Issues in Using Children's Blood Lead Levels as a Remedial Action Objective

    PubMed Central

    Evans, Emily Lorraine

    2011-01-01

    The Environmental Protection Agency measures the success or failure of Superfund site remediation efforts against remedial action objectives (RAOs). RAOs are frequently based on environmental contaminant concentrations, but with lead exposure, blood lead levels from the population at risk are often used. Although childhood lead screening is an important public health tool, an RAO based on child blood lead levels raises ethical concerns: public health efforts that are more reactive than preventive, a blood lead standard (10 μg/dL) that may not be fully protective, the use of a measure whose validity and reliability may be easily compromised, and exacerbation of environmental injustice and systematic disadvantages. The example of Bunker Hill mine, Kellogg, Idaho, allowed an examination of these ethical concerns. PMID:21836120

  15. Mitigation of Remedial Action Schemes by Decentralized Robust Governor Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elizondo, Marcelo A.; Marinovici, Laurentiu D.; Lian, Jianming

    This paper presents transient stability improvement by a new distributed hierarchical control architecture (DHC). The integration of remedial action schemes (RAS) to the distributed hierarchical control architecture is studied. RAS in power systems are designed to maintain stability and avoid undesired system conditions by rapidly switching equipment and/or changing operating points according to predetermined rules. The acceleration trend relay currently in use in the US western interconnection is an example of RAS that trips generators to maintain transient stability. The link between RAS and DHC is through fast acting robust turbine/governor control that can also improve transient stability. In thismore » paper, the influence of the decentralized robust turbine/governor control on the design of RAS is studied. Benefits of combining these two schemes are increasing power transfer capability and mitigation of RAS generator tripping actions; the later benefit is shown through simulations.« less

  16. California state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.« less

  17. Oregon state information handbook formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  18. Iowa state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.« less

  19. Oregon state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  20. Pennsylvania state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  1. Florida state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description ofmore » the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  2. Superfund Record of Decision (EPA Region 9): San Fernando Valley (Area 1), CA. (Second Remedial Action), June 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-06-30

    The San Fernando Valley Basin (SFVB) Area 1 site is one of four Superfund sites (including SFVB Areas 2, 3, and 4) being remediated as one large site. The SFVB lies within the approximately 32B,500-acre Upper Los Angeles River area. The remedial action is for the Burbank Well Field operable unit of the SFVB Area 1 site, located within the city of Burbank, California, and addresses a portion of the overall ground-water problem in the SFVB Areas 1, 2, 3, and 4 sites. The primary contaminants of concern are VOCs including TCE and PCE. The selected remedial action for themore » site includes pumping and treatment of ground water contaminated with TCE exceeding 100 microg/l or PCE exceeding 5 microg/l using air or stream stripping, with vapor phase GAC adsorption units if air stripping is used, and discharge to the municipal-water-supply distribution system; and ground water monitoring.« less

  3. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collectionmore » adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with

  4. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miles, W.C. Jr.

    1992-10-28

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs[sup 137]). The Tank 16more » bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action.« less

  5. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miles, W.C. Jr.

    1992-10-28

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs{sup 137}). The Tank 16more » bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action.« less

  6. Superfund Record of Decision (EPA Region 5): Enviro-Chem (Northside Sanitary Landfill), Zionsville, IN. (First remedial action), (Amendment), June 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Enviro-chem site is a former waste recovery/reclamation/brokerage facility in Boone County, Indiana. Adjacent to the site is another Superfund site, the Northside Sanitary Landfill (NSL) which, prior to the Record of Decision (ROD) amendment, was to be remediated in a combined remedy for both sites. Land use in the area is agricultural and residential to the north and west. In May 1982, the State ordered Enviro-Chem to close and environmentally secure the site because it failed to reduce hazardous waste inventories. Subsequently, two emergency removal actions were conducted to remove the major sources of contamination. The ROD amends themore » 1987 ROD and provides a comprehensive site remedy for the Enviro-Chem site addressing source control instead of ground water remediation. The primary contaminants of concern affecting the soil are VOCs including PCE, TCE, toluene; and other organics including phenols. The amended remedial action for the site includes treating contaminated soil onsite using soil vapor extraction with a granulated activated carbon system to control the extracted vapor and implementing a contingent remedy for a subsurface ground water collection and treatment system.« less

  7. Remedial Action Assessment System (RAAS): A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buelt, J.L.; Stottlemyre, J.A.; White, M.K.

    1991-09-01

    Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigations/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating establishment technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies requires by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  8. Remedial Action Assessment System (RAAS): A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buelt, J.L.; Stottlemyre, J.A.; White, M.K.

    1991-02-01

    Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating established technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies required by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  9. New Mexico state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description ofmore » the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  10. Overview of Green and Sustainable Remediation for Soil and Groundwater Remediation - 12545

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpkin, Thomas J.; Favara, Paul

    2012-07-01

    Making remediation efforts more 'sustainable' or 'green' is a topic of great interest in the remediation community. It has been spurred on by Executive Orders from the White House, as well as Department of Energy (DOE) sustainability plans. In private industry, it is motivated by corporate sustainability goals and corporate social responsibility. It has spawned new organizations, areas of discussion, tools and practices, and guidance documents around sustainable remediation or green remediation. Green remediation can be thought of as a subset of sustainable remediation and is mostly focused on reducing the environmental footprint of cleanup efforts. Sustainable remediation includes bothmore » social and economic considerations, in addition to environmental. Application of both green and sustainable remediation (GSR) may involve two primary activities. The first is to develop technologies and alternatives that are greener or more sustainable. This can also include making existing remediation approaches greener or more sustainable. The second is to include GSR criteria in the evaluation of remediation alternatives and strategies. In other words, to include these GSR criteria in the evaluation of alternatives in a feasibility study. In some cases, regulatory frameworks allow the flexibility to include GSR criteria into the evaluation process (e.g., state cleanup programs). In other cases, regulations allow less flexibility to include the evaluation of GSR criteria (e.g., Comprehensive Environmental Response Compensation, and Liability Act (CERCLA)). New regulatory guidance and tools will be required to include these criteria in typical feasibility studies. GSR provides a number of challenges for remediation professionals performing soil and groundwater remediation projects. Probably the most significant is just trying to stay on top of the ever changing landscape of products, tools, and guidance documents coming out of various groups, the US EPA, and states. However

  11. Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whelan, G.; Hartz, K.E.; Hilliard, N.D.

    1990-04-01

    Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluatedmore » and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.« less

  12. REMEDIAL ACTION, TREATMENT AND DISPOSAL OF HAZARDOUS WASTE: PROCEEDINGS OF THE SIXTEENTH ANNUAL HAZARDOUS WASTE RESEARCH SYMPOSIUM

    EPA Science Inventory

    The Sixteenth Annual Research Symposium on Remedial Action, Treatment and Disposal of Hazardous Waste was held in Cincinnati, Ohio, April 3-5, 1990. he purpose of this Symposium was to present the latest significant research findings from ongoing and recently completed projects f...

  13. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may bemore » necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.« less

  14. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  15. Superfund Record of Decision (EPA Region 5): Better Brite Plating Chrome and Zinc, De Pere, WI. (First remedial action), June 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 2-acre Better Brite Plating Chrome and Zinc site is composed of two plating facilities in De Pere, Brown County, Wisconsin. The site includes the 1.5-acre Chrome Shop and the 0.5-acre Zinc Shop. Land use in the area is predominantly residential and commercial, with a wetlands located approximately one-quarter mile from the site. The estimated 15,000 area residents use the municipal wells drawing from the deep aquifer as a drinking water supply. The Zinc Shop has a long history of improper operational procedures and spills into the surrounding soil. The selected remedial action for this interim remedy includes continuing andmore » expanding the current operation of the ground water extraction system and pretreatment facility, which will include pretreatment of the additional water collected by the surface water and ground water collection systems, and the Chrome and Zinc shops, with discharge to the De Pere wastewater system.« less

  16. 39 CFR 927.3 - Other remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Other remedies. 927.3 Section 927.3 Postal Service... § 927.3 Other remedies. The procedures and other requirements of this part apply only where the Postal... remedies available to the Postal Service, including such remedies as summary action to withhold tender of...

  17. 39 CFR 927.3 - Other remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Other remedies. 927.3 Section 927.3 Postal Service... § 927.3 Other remedies. The procedures and other requirements of this part apply only where the Postal... remedies available to the Postal Service, including such remedies as summary action to withhold tender of...

  18. 48 CFR 203.906 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Remedies. 203.906 Section... for Contractor Employees 203.906 Remedies. (1) Not later than 30 days after receiving a DoD Inspector... administrative remedies with respect to the complaint; and (ii) The complainant may bring a de novo action at law...

  19. 48 CFR 203.906 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Remedies. 203.906 Section... for Contractor Employees 203.906 Remedies. (1) Not later than 30 days after receiving a DoD Inspector... administrative remedies with respect to the complaint; and (ii) The complainant may bring a de novo action at law...

  20. Superfund Record of Decision (EPA Region 5): Bofors Nobel Site, Muskegon, MI. (First remedial action), (amendment), July 1992. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 85-acre Bofors Nobel site contains an active specialty chemical production plant in Egelston Township, Muskegon County, Michigan. Site features include an unused landfill. The ROD amends a 1990 ROD written by the state, which consisted of onsite incineration and onsite landfilling of lagoon area soil, construction of RCRA-type secure landfill cells to hold non-incinerated material and ash from the incinerated sludge. The selected amended remedial action for the site includes excavating and containing approximately 767,000 cubic yards of untreated sludge and soil in onsite RCRA-type secure landfill cells constructed as part of the original remedial action. The ROD Amendmentmore » does not address any issue associated with ground water treatment.« less

  1. CENTRAL PLATEAU REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less

  2. Self vs. Other Focus: Predicting Professionalism Remediation of Emergency Medicine Residents.

    PubMed

    Thaxton, Robert E; Jones, Woodson S; Hafferty, Fred W; April, Carolyn W; April, Michael D

    2018-01-01

    Unprofessionalism is a major reason for resident dismissal from training. Because of the high stakes involved, residents and educators alike would benefit from information predicting whether they might experience challenges related to this competency. Our objective was to correlate the outcome of professionalism-related remedial actions during residency with the predictor variable of resident response to a standardized interview question: "Why is Medicine important to you?" We conducted a professional development quality improvement (QI) initiative to improve resident education and mentorship by achieving a better understanding of each resident's reasons for valuing a career in medicine. This initiative entailed an interview administered to each resident beginning emergency medicine training at San Antonio Military Medical Center during 2006-2013. The interviews uniformly began with the standardized question "Why is Medicine important to you?" The residency program director documented a free-text summary of each response to this question, the accuracy of which was confirmed by the resident. We analyzed the text of each resident's response after a review of the QI data suggested an association between responses and professionalism actions (retrospective cohort design). Two associate investigators blinded to all interview data, remedial actions, and resident identities categorized each text response as either self-focused (e.g., "I enjoy the challenge") or other-focused (e.g., "I enjoy helping patients"). Additional de-identified data collected included demographics, and expressed personal importance of politics and religion. The primary outcome was a Clinical Competency Committee professionalism remedial action. Of 114 physicians starting residency during 2006-2013, 106 (93.0%) completed the interview. There was good inter-rater reliability in associate investigator categorization of resident responses as either self-focused or other-focused (kappa coefficient 0

  3. Data Gaps in Remedial Design (USACE)

    EPA Pesticide Factsheets

    As the number of Supertund sites In the phases of Remedial Design (RD) and Remedial Action (RA) has grown. we have become increasingly aware of the adverse effects of inadequate or insufficient design data.

  4. 29 CFR 35.40 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Exhaustion of administrative remedies. 35.40 Section 35.40... Enforcement Procedures § 35.40 Exhaustion of administrative remedies. (a) A complainant may file a civil action under the Act following the exhaustion of administrative remedies. Administrative remedies are...

  5. 34 CFR 110.39 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Exhaustion of administrative remedies. 110.39 Section... administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative remedies are exhausted if— (1) One hundred eighty days have elapsed...

  6. 24 CFR 146.45 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... remedies. 146.45 Section 146.45 Housing and Urban Development Regulations Relating to Housing and Urban... Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative remedies are exhausted if: (1) 180 days have elapsed since...

  7. 29 CFR 35.40 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Exhaustion of administrative remedies. 35.40 Section 35.40... Enforcement Procedures § 35.40 Exhaustion of administrative remedies. (a) A complainant may file a civil action under the Act following the exhaustion of administrative remedies. Administrative remedies are...

  8. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISSmore » is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.« less

  9. 10 CFR 4.340 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Exhaustion of administrative remedies. 4.340 Section 4.340... administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative remedies are exhausted if— (1) 180 days have elapsed since the...

  10. Remediation of at-risk medical students: theory in action

    PubMed Central

    2013-01-01

    Background Previous work has shown that a programme that draws on a blend of theories makes a positive difference to outcomes for students who fail and repeat their first semester at medical school. Exploration of student and teacher perspectives revealed that remediation of struggling medical students can be achieved through a cognitive apprenticeship within a small community of inquiry. This community needs expert teachers capable of performing a unique combination of roles (facilitator, nurturing mentor, disciplinarian, diagnostician and role model), with high levels of teaching presence and practical wisdom. Yet, despite participants’ convergent opinions on the elements of effective remediation, significant differences were found between outcomes of students working with experienced and inexperienced teachers. The current study explores the actual practice of teachers on this remediation course, aiming to exemplify elements of our theory of remediation and explore differences between teachers. Methods Since it is in the classroom context that the interactions that constitute the complex process of remediation emerge, this practice-based research has focused on direct observation of classroom teaching. Nineteen hours of small group sessions were recorded and transcribed. Drawing on ethnography and sociocultural discourse analysis, selected samples of talk-in-context demonstrate how the various elements of remediation play out in practice, highlighting aspects that are most effective, and identifying differences between experienced and novice teachers. Results Long-term student outcomes are strongly correlated to teacher experience (r, 0.81). Compared to inexperienced teachers, experienced teachers provide more challenging, disruptive facilitation, and take a dialogic stance that encourages more collaborative group dynamics. They are more expert at diagnosing cognitive errors, provide frequent metacognitive time-outs and make explicit links across the

  11. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-08-10

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant areamore » and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.« less

  12. Superfund Record of Decision (EPA Region 5): Northside Sanitary Landfill (Enviro-Chem), Zionsville, IN. (First remedial action), (Amendment), June 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Northside Sanitary Landfill site is a hazardous and solid waste disposal facility in Boone County, Indiana. Adjacent to the Northside Sanitary Landfill (NSL) site is another Superfund site, Enviro-Chem which, prior to the Record of Decision (ROD) amendment, was to be remediated in a combined remedy for both sites. Land use in the area is agricultural to the south and east, and residential to the north and west. The ROD amendment provides a comprehensive remedy and addresses both source control and ground water remediation. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene,more » PCE, TCE, and toluene; other organics including phenols; metals including arsenic, chromium, and lead; and oils. The amended remedial action for the site includes constructing a pipeline to pump ground water and leachate offsite to the city sewer system at the city wastewater treatment plant and constructing a hydraulic isolation wall system.« less

  13. Level 1 remedial investigation work plan, 300 Area Process Ponds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report discusses the objectives of the site characterization for the 300 Area Process Ponds which are to identify and quantify contamination at the ponds and to estimate their potential impact on human health and the environment. The results of the site characterization will be used to identify any future actions related to contamination at the site and to identify any additional data requirements needed to support selection of a remedial action. 9 refs., 12 figs., 8 tabs.

  14. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Busse, John; Keil, Karen; Staten, Jane

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS undermore » the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of

  15. 44 CFR 7.949 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... remedies. 7.949 Section 7.949 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... Investigation, Conciliation, and Enforcement Procedures § 7.949 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  16. 44 CFR 7.949 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... remedies. 7.949 Section 7.949 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... Investigation, Conciliation, and Enforcement Procedures § 7.949 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  17. 49 CFR 234.305 - Remedial actions in response to reports of unsafe conditions at highway-rail and pathway grade...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... conditions at highway-rail and pathway grade crossings. 234.305 Section 234.305 Transportation Other... Pathway Grade Crossings § 234.305 Remedial actions in response to reports of unsafe conditions at highway-rail and pathway grade crossings. (a) General rule on response to credible report of warning system...

  18. 49 CFR 234.305 - Remedial actions in response to reports of unsafe conditions at highway-rail and pathway grade...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... conditions at highway-rail and pathway grade crossings. 234.305 Section 234.305 Transportation Other... Pathway Grade Crossings § 234.305 Remedial actions in response to reports of unsafe conditions at highway-rail and pathway grade crossings. (a) General rule on response to credible report of warning system...

  19. 49 CFR 234.305 - Remedial actions in response to reports of unsafe conditions at highway-rail and pathway grade...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... conditions at highway-rail and pathway grade crossings. 234.305 Section 234.305 Transportation Other... Pathway Grade Crossings § 234.305 Remedial actions in response to reports of unsafe conditions at highway-rail and pathway grade crossings. (a) General rule on response to credible report of warning system...

  20. 41 CFR 101-8.724 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... administrative remedies. 101-8.724 Section 101-8.724 Public Contracts and Property Management Federal Property... Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative remedies are exhausted if: (1) 180 calendar days elapse...

  1. 41 CFR 101-8.724 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... administrative remedies. 101-8.724 Section 101-8.724 Public Contracts and Property Management Federal Property... Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative remedies are exhausted if: (1) 180 calendar days elapse...

  2. FEASIBILITY OF HYDRAULIC FRACTURING OF SOILS TO IMPROVE REMEDIAL ACTIONS

    EPA Science Inventory

    Hydraulic fracturing, a method of increasing fluid flow within the subsurface, should improve the effectiveness of several remedial techniques, including pump and treat, vapor extraction, bio-remediation, and soil-flushing. he technique is widely used to increase the yields of oi...

  3. Corrective Action Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less

  4. 14 CFR 1252.410 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Exhaustion of administrative remedies. 1252..., Conciliation, and Enforcement Procedures § 1252.410 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  5. 38 CFR 18.550 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... administrative remedies. 18.550 Section 18.550 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS..., Conciliation, and Enforcement Procedures § 18.550 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative...

  6. Ground-water, surface-water, and bottom-sediment contamination in the O-field area, Aberdeen Proving Ground, Maryland, and the possible effects of selected remedial actions on ground water

    USGS Publications Warehouse

    Vroblesky, Don A.; Lorah, Michelle M.; Oliveros, James P.

    1995-01-01

    Disposal of munitions and chemical-warfare substances has introduced inorganic and organic contaminants to the ground water, surface water, and bottom sediment at O-Field, in the Edgewood area of Aberdeen Proving Ground, Maryland. Contaminants include chloride, arsenic, transition metals, chlorinated aliphatic hydrocarbons, aromatic compounds, and organosulfur and organophosphorus compounds. The hydrologic effects of several remedial actions were estimated by use of a ground-water-flow model. The remedial actions examined were an impermeable covering, encapsulation, subsurface barriers, a ground-water drain, pumping of wells to manage water levels or to remove contaminated ground water for treatment, and no action.

  7. 43 CFR 17.339 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Exhaustion of administrative remedies. 17... Investigation, Conciliation, and Enforcement Procedures § 17.339 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  8. 45 CFR 91.50 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Exhaustion of administrative remedies. 91.50... Investigation, Conciliation, and Enforcement Procedures § 91.50 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  9. 45 CFR 91.50 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Exhaustion of administrative remedies. 91.50... Investigation, Conciliation, and Enforcement Procedures § 91.50 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  10. 45 CFR 1156.21 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Exhaustion of administrative remedies. 1156.21... Investigation, Conciliation, and Enforcement Procedures § 1156.21 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  11. SURFACES PRELIMINARY REMEDIATION GOALS FOR RADIONUCLIDES (SPRG)

    EPA Science Inventory

    Internet based Calculational tool for establishing 10(-6) cancer risk based Preliminary Remediation Goals (PRGs) for radioactively contaminated outside hard surfaces (e.g., streets, sidewalks, slabs, and outside of buildings) for CERCLA remedial response actions.

  12. Error Analysis and Remedial Teaching.

    ERIC Educational Resources Information Center

    Corder, S. Pit

    The purpose of this paper is to analyze the role of error analysis in specifying and planning remedial treatment in second language learning. Part 1 discusses situations that demand remedial action. This is a quantitative assessment that requires measurement of the varying degrees of disparity between the learner's knowledge and the demands of the…

  13. 18 CFR 808.17 - Enforcement of penalties, abatement or remedial orders.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Enforcement of penalties, abatement or remedial orders. 808.17 Section 808.17 Conservation of Power and Water Resources... counsel are authorized to take such additional action as may be necessary to assure compliance with this...

  14. 18 CFR 808.17 - Enforcement of penalties, abatement or remedial orders.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Enforcement of penalties, abatement or remedial orders. 808.17 Section 808.17 Conservation of Power and Water Resources... counsel are authorized to take such additional action as may be necessary to assure compliance with this...

  15. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  16. 40 CFR 7.175 - Exhaustion of administrative remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Exhaustion of administrative remedy. 7... Discrimination Prohibited on the Basis of Age § 7.175 Exhaustion of administrative remedy. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Age Discrimination...

  17. 40 CFR 7.175 - Exhaustion of administrative remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Exhaustion of administrative remedy. 7... Discrimination Prohibited on the Basis of Age § 7.175 Exhaustion of administrative remedy. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Age Discrimination...

  18. 48 CFR 203.906 - Remedies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... either party to the action, be tried by the court with a jury. An action under this authority may not be... specifically entered by the court. (6) The rights and remedies provided for in this subpart may not be waived...

  19. 48 CFR 203.906 - Remedies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... either party to the action, be tried by the court with a jury. An action under this authority may not be... specifically entered by the court. (6) The rights and remedies provided for in this subpart may not be waived...

  20. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  1. Rules of thumb for superfund remedy selection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    The guidance document describes key principles and expectations, interspersed with `best practices` based on program experience, that should be consulted during the Superfund remedy selection process. These remedy selection `Rules of Thumb` are organized into three major policy areas: (1) risk assessment and risk management, (2) developing remedial alternatives, and (3) ground-water response actions. The purpose of this guide is to briefly summarize key elements of various remedy selection guidance documents and policies in one publication.

  2. Sacrificing a Latina/o Presence in the Professoriate: An Analysis of Affirmative Action as Racial Remedy and Silent Covenant

    ERIC Educational Resources Information Center

    Espino, Michelle M.

    2015-01-01

    This article focuses on the extent to which affirmative action policies and practices as remedies for racial injustice in higher education reflect a silent covenant that sacrifices the cultivation and presence of Latina/o faculty. Drawing upon the lived experiences of 22 Mexican American faculty and post-doctoral fellows, the author argues that,…

  3. A comparison of pre- and post-remediation water quality, Mineral Creek, Colorado

    USGS Publications Warehouse

    Runkel, R.L.; Bencala, K.E.; Kimball, B.A.; Walton-Day, K.; Verplanck, P.L.

    2009-01-01

    Pre- and post-remediation data sets are used herein to assess the effectiveness of remedial measures implemented in the headwaters of the Mineral Creek watershed, where contamination from hard rock mining has led to elevated metal concentrations and acidic pH. Collection of pre- and post-remediation data sets generally followed the synoptic mass balance approach, in which numerous stream and inflow locations are sampled for the constituents of interest and estimates of streamflow are determined by tracer dilution. The comparison of pre- and post-remediation data sets is confounded by hydrologic effects and the effects of temporal variation. Hydrologic effects arise due to the relatively wet conditions that preceded the collection of pre-remediation data, and the relatively dry conditions associated with the post-remediation data set. This difference leads to a dilution effect in the upper part of the study reach, where pre-remediation concentrations were diluted by rainfall, and a source area effect in the lower part of the study reach, where a smaller portion of the watershed may have been contributing constituent mass during the drier post-remediation period. A second confounding factor, temporal variability, violates the steady-state assumption that underlies the synoptic mass balance approach, leading to false identification of constituent sources and sinks. Despite these complications, remedial actions completed in the Mineral Creek headwaters appear to have led to improvements in stream water quality, as post-remediation profiles of instream load are consistently lower than the pre-remediation profiles over the entire study reach for six of the eight constituents considered (aluminium, arsenic, cadmium, copper, iron, and zinc). Concentrations of aluminium, cadmium, copper, lead, and zinc remain above chronic aquatic-life standards, however, and additional remedial actions may be needed. Future implementations of the synoptic mass balance approach should be

  4. 40 CFR 35.6055 - State-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false State-lead pre-remedial Cooperative... for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6055 State-lead pre-remedial Cooperative Agreements. (a) To receive a State-lead pre-remedial Cooperative Agreement, the...

  5. Greener and sustainable remediation using iron nanomaterials

    EPA Science Inventory

    The main goal of remediation is to protect humans and the environment. Unfortunately, many remedial actions in the past concentrated more on site-specific environmental risks and conditions completely ignoring external social and economic impacts. Thus, new approach called green ...

  6. 77 FR 12293 - PCBs Bulk Product v. Remediation Waste

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    .... Remediation Waste AGENCY: Environmental Protection Agency (EPA). ACTION: Request for Public Comment. SUMMARY... biphenyl (PCB) disposal regulations regarding PCB bulk product and PCB remediation waste. The proposed... regarding PCB bulk product and PCB remediation waste under regulations promulgated at 40 CFR part 761. The...

  7. A novel bacteriophage KSL-1 of 2-Keto-gluconic acid producer Pseudomonas fluorescens K1005: isolation, characterization and its remedial action

    PubMed Central

    2012-01-01

    Background Bacteriophages have the destructive damage on the industrial bioprocess. 2-Keto-gluconic acid (2KGA) producing bacteria had also been attacked and lysed by bacteriophages which lowered the glucose consumption and 2KGA yield and even stopped the fermentation process. In this study, we presented the characteristics of a novel virulent bacteriophage specifically infecting Pseudomonas fluorescens K1005 and proposed an efficient remedial action for this phage infection to reduce the production loss. Results The phage KSL-1 of Pseudomonas fluorescens K1005 was isolated from abnormal 2KGA fermentation broth. It belonged to the Siphoviridae family with a hexagonal head diameter of about 99 nm and a non-contractile tail of about 103 nm × 39 nm. The genome size of phage KSL-1 was estimated to be approximately 53 kbp. Its optimal MOI to infect P. fluorescens K1005 was about 0.001. One-step growth curve gave its latent and burst periods of 90 min and 75 min with a burst size of 52 phage particles per infected cell. This phage was stable with a pH range of 7.0–10.0, and sensitive to thermal treatment. Finally, a simple remedial action was proposed by feeding fresh seed culture. Compared with the infected 2KGA fermentation, the remedial experiments restored 2KGA fermentation performance by increasing the produced 2KGA concentration to 159.89 g/L and shortening the total fermentation time of 80 h with the productivity and yield of 2.0 g/L.h and 0.89 g/g. The obtained data proved that this method was effective to combat the phage infections problems during the 2KGA fermentation. Conclusion The phage KSL-1 was a novel bacteriophage specifically infecting Pseudomonas fluorescens K1005. The remedial action of feeding fresh seed culture to the infected broth was an easily-operating and effective method to maintain a high 2KGA yield and avoid the draft of infected broth. PMID:22747634

  8. 75 FR 34625 - Administrative Remedy Program: Exception to Initial Filing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Remedy Program: Exception to Initial Filing Procedures AGENCY: Bureau of Prisons, Justice. ACTION... Administrative Remedy Program to add an exception to initial filing of Administrative Remedy appeals at the institution level. The exception will state that formal administrative remedy requests regarding initial...

  9. Pilot Study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater Volumes 1 and 2 EPA/600/SR-93/012

    EPA Science Inventory

    This two-volume report presents information on a 5-yr pilot study (1986- 1991) sponsored by the North Atlantic Treaty Organization's (NATO) Committee on the Challenges of Modern Society (CCMS) entitled "Demonstration of Remedial Action Technologies for Contaminated Land and Gr...

  10. Superfund Record of Decision (EPA Region 5): Allied Chemical/Ironton Coke Site, Ironton, Ohio (second remedial action) September 1988. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-09-29

    The Allied Chemical site is located in the City of Ironton, Lawrence County, Ohio. The remedial action addresses the Goldcamp Disposal Area (GDA) operable unit of the site. The GDA was a sand and gravel pit used for disposal of various chemical wastes from three sources between 1945 and 1977. In 1977, Allied decided to discontinue use of the GDA for disposal of chemical wastes. Allied and its contractor, in consultation with the Ohio Environmental Protection Agency (OEPA), completed a closure project at the site in August 1980, which involved removal of standing liquids and filling and capping the sitemore » with clay. Subsequent hydrogeologic and water-quality investigations indicated that there is ground-water contamination at the site which may pose a threat to public health through migration. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, other organics including phenols and PAHs, and inorganics including cyanide. The selected remedial action for the site is included.« less

  11. 10 CFR 1040.89-13 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Exhaustion of administrative remedies. 1040.89-13 Section... Investigation, Conciliation and Enforcement Procedures § 1040.89-13 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  12. 10 CFR 1040.89-13 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Exhaustion of administrative remedies. 1040.89-13 Section... Investigation, Conciliation and Enforcement Procedures § 1040.89-13 Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act...

  13. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  14. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documentsmore » the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.« less

  15. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 2-AFFIRMATIVE ACTION PROGRAMS Purpose and Contents of Affirmative Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the...

  16. 48 CFR 3.907-6 - Remedies and enforcement authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Remedies and enforcement... Contractor Employees 3.907-6 Remedies and enforcement authority. (a) Burden of Proof. (1) Disclosure as... administrative remedies with respect to the complaint, and the complainant may bring a de novo action at law or...

  17. Evaluation of remedial treatments at skid accident locations.

    DOT National Transportation Integrated Search

    1974-01-01

    The Virginia Department of Highways has for many years been concerned with the slipperiness of highway pavements, and has undertaken remedial action at numerous high wet accident locations. The purpose of this study was to evaluate the remedial actio...

  18. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: AEROBIC BIODEGRADATION REMEDY SCREENING

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (KU FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and L...

  19. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include the...

  20. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include the...

  1. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include the...

  2. Landfill Remediation Feasibility Study, Devens, Massachusetts. Volume 1. Text, Figures, and Tables

    DTIC Science & Technology

    1997-01-01

    REMEDIATION FEASIBILITY STUDY DEVENS , MA Remedial Action Alternative Retained Eliminated PA-i: Cap-in-Place AOCs 9, 11, 40, 41 X Excavate/Dispose... AOC * 9 & 40 LANDFILL REMEDIATION FEASIBIUTY STUDY DEVENS , MA DIRECT COSTS NO FURTHER ACTION SA 6 $ 0 SA 12 0 SA 13 0 AOC 41 0 LIMITED REMOVAL AT AOC ... Fort Devens ), Devens , Massachusetts. 11 12 The FS is being conducted in accordance with the U.S. Environmental

  3. Notification: Audit of EPA's Processes for Managing Background Investigations of Privileged Users and Taking Action to Remediate Weaknesses in Agency's Information Security Program

    EPA Pesticide Factsheets

    Project #OA-FY17-0139, Feb 15, 2017.The EPA OIG plans to begin preliminary research on an audit of EPA's processes for managing background investigations of privileged users and taking action to remediate weaknesses in agency's info security program.

  4. Superfund Record of Decision (EPA Region 5): Summit National Liquid Disposal Service, Deerfield, OH. (First remedial action), (Amendment), November 1990. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 11.5-acre Summit National Liquid Disposal Service site is a former liquid waste disposal facility in rural Deerfield Township, Ohio. The site contains two ponds, an inactive incinerator, and several vacant buildings. Surrounding the site are several residences, two landfills, light industries, and farmland. From 1973 to 1978, Summit National operated a solvent recycling and waste disposal facility onsite. The Record of Decision (ROD) amends a 1988 ROD that provided for remediation of contaminated soil, sediment, debris, ground water, and surface water. In both the 1990 proposed remedy for the ROD amendment and the 1988 ROD, the remedy for themore » most highly contaminated soil and sediment is excavation and treatment. The amended remedial action for the site includes expanding site boundaries to include contaminated areas along the site perimeters; excavating and incinerating onsite 24,000 cubic yards of soil excavated to a depth of 2 feet, 4,000 cubic yards of sediment from the site perimeter, drainage ditches and offsite ponds, and 900 to 1,600 buried drums.« less

  5. Superfund Record of Decision (EPA Region 6): Koppers Texarkana Site, Texarkana, Texas (first remedial action), September 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Koppers Texarkana site is located within the City of Texarkana, Texas. The site consists of a 34-acre residential area and a 28-acre former sand and gravel operation. The Koppers Company operated the site as a wood-preserving facility from 1910 to 1961 using pentachlorophenol (PCP), creosote, and metallic salts in the operation. The site is currently owned by Carver Terrace, Inc. The Texas Department of Water Resources became aware of the site in 1979 through the Ekhardt Survey. The remedial investigation indicated that the highest concentration of site contaminants in the soil were located near the operations and drip trackmore » areas of the old wood-preserving facility. The primary contaminants of concern affecting the soil, ground water, and sediments are volatile organic compounds including benzene, xylenes, and toluene, other organics including polynuclear aromatic hydrocarbons and PCP, and metals including arsenic. The selected remedial action for the site is included.« less

  6. 40 CFR 35.6110 - Indian Tribe-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Indian Tribe-lead remedial Cooperative... for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6110 Indian Tribe-lead remedial Cooperative Agreements. (a) Application requirements. The Indian Tribe must comply with all of the...

  7. 40 CFR 35.6110 - Indian Tribe-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Indian Tribe-lead remedial Cooperative... for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6110 Indian Tribe-lead remedial Cooperative Agreements. (a) Application requirements. The Indian Tribe must comply with all of the...

  8. 40 CFR 35.6110 - Indian Tribe-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Indian Tribe-lead remedial Cooperative... for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6110 Indian Tribe-lead remedial Cooperative Agreements. (a) Application requirements. The Indian Tribe must comply with all of the...

  9. 40 CFR 35.6110 - Indian Tribe-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Indian Tribe-lead remedial Cooperative... for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6110 Indian Tribe-lead remedial Cooperative Agreements. (a) Application requirements. The Indian Tribe must comply with all of the...

  10. 40 CFR 35.6110 - Indian Tribe-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Indian Tribe-lead remedial Cooperative... for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6110 Indian Tribe-lead remedial Cooperative Agreements. (a) Application requirements. The Indian Tribe must comply with all of the...

  11. 40 CFR 35.6115 - Political subdivision-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Political subdivision-lead remedial... subdivision-lead remedial Cooperative Agreements. (a) General. If the State concurs, EPA may allow a political.... If it is designated the lead for remedial action, the political subdivision must provide the...

  12. 40 CFR 35.6115 - Political subdivision-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Political subdivision-lead remedial... subdivision-lead remedial Cooperative Agreements. (a) General. If the State concurs, EPA may allow a political.... If it is designated the lead for remedial action, the political subdivision must provide the...

  13. 40 CFR 35.6115 - Political subdivision-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Political subdivision-lead remedial... subdivision-lead remedial Cooperative Agreements. (a) General. If the State concurs, EPA may allow a political.... If it is designated the lead for remedial action, the political subdivision must provide the...

  14. 40 CFR 35.6115 - Political subdivision-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Political subdivision-lead remedial... subdivision-lead remedial Cooperative Agreements. (a) General. If the State concurs, EPA may allow a political.... If it is designated the lead for remedial action, the political subdivision must provide the...

  15. 40 CFR 35.6115 - Political subdivision-lead remedial Cooperative Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Political subdivision-lead remedial... subdivision-lead remedial Cooperative Agreements. (a) General. If the State concurs, EPA may allow a political.... If it is designated the lead for remedial action, the political subdivision must provide the...

  16. 75 FR 55340 - Recovery Fact Sheet 9580.100, Mold Remediation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ...] Recovery Fact Sheet 9580.100, Mold Remediation AGENCY: Federal Emergency Management Agency, DHS. ACTION... accepting comments on Recovery Fact Sheet RP9580.100, Mold Remediation. DATES: Comments must be received by... 20472-3100. II. Background The Recovery Fact Sheet RP9580.100, Mold Remediation, identifies the expenses...

  17. Additive Routes to Action Learning: Layering Experience Shapes Engagement of the Action Observation Network.

    PubMed

    Kirsch, Louise P; Cross, Emily S

    2015-12-01

    The way in which we perceive others in action is biased by one's prior experience with an observed action. For example, we can have auditory, visual, or motor experience with actions we observe others perform. How action experience via 1, 2, or all 3 of these modalities shapes action perception remains unclear. Here, we combine pre- and post-training functional magnetic resonance imaging measures with a dance training manipulation to address how building experience (from auditory to audiovisual to audiovisual plus motor) with a complex action shapes subsequent action perception. Results indicate that layering experience across these 3 modalities activates a number of sensorimotor cortical regions associated with the action observation network (AON) in such a way that the more modalities through which one experiences an action, the greater the response is within these AON regions during action perception. Moreover, a correlation between left premotor activity and participants' scores for reproducing an action suggests that the better an observer can perform an observed action, the stronger the neural response is. The findings suggest that the number of modalities through which an observer experiences an action impacts AON activity additively, and that premotor cortical activity might serve as an index of embodiment during action observation. © The Author 2015. Published by Oxford University Press.

  18. 40 CFR 300.420 - Remedial site evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section is to describe the methods, procedures, and criteria the lead agency shall use to collect data, as...) Remedial preliminary assessment. (1) The lead agency shall perform a remedial PA on all sites in CERCLIS as... indicates that a removal action may be warranted, the lead agency shall initiate removal evaluation pursuant...

  19. 40 CFR 300.420 - Remedial site evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section is to describe the methods, procedures, and criteria the lead agency shall use to collect data, as...) Remedial preliminary assessment. (1) The lead agency shall perform a remedial PA on all sites in CERCLIS as... indicates that a removal action may be warranted, the lead agency shall initiate removal evaluation pursuant...

  20. What you find is not always what you fix--how other aspects than causes of accidents decide recommendations for remedial actions.

    PubMed

    Lundberg, Jonas; Rollenhagen, Carl; Hollnagel, Erik

    2010-11-01

    In accident investigation, the ideal is often to follow the principle "what-you-find-is-what-you-fix", an ideal reflecting that the investigation should be a rational process of first identifying causes, and then implement remedial actions to fix them. Previous research has however identified cognitive and political biases leading away from this ideal. Somewhat surprisingly, however, the same factors that often are highlighted in modern accident models are not perceived in a recursive manner to reflect how they influence the process of accident investigation in itself. Those factors are more extensive than the cognitive and political biases that are often highlighted in theory. Our purpose in this study was to reveal constraints affecting accident investigation practices that lead the investigation towards or away from the ideal of "what-you-find-is-what-you-fix". We conducted a qualitative interview study with 22 accident investigators from different domains in Sweden. We found a wide range of factors that led investigations away from the ideal, most which more resembled factors involved in organizational accidents, rather than reflecting flawed thinking. One particular limitation of investigation was that many investigations stop the analysis at the level of "preventable causes", the level where remedies that were currently practical to implement could be found. This could potentially limit the usefulness of using investigations to get a view on the "big picture" of causes of accidents as a basis for further remedial actions. 2010 Elsevier Ltd. All rights reserved.

  1. 24 CFR 1003.703 - Other remedies for noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Other remedies for noncompliance. 1003.703 Section 1003.703 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Program Performance § 1003.703 Other remedies for noncompliance. (a) Secretarial actions. If the Secretary...

  2. 12 CFR 1238.8 - Additional implementing action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 10 2014-01-01 2014-01-01 false Additional implementing action. 1238.8 Section 1238.8 Banks and Banking FEDERAL HOUSING FINANCE AGENCY ENTITY REGULATIONS STRESS TESTING OF REGULATED..., require any regulated entity not subject to this part to conduct stress testing hereunder; and from time...

  3. 42 CFR 488.406 - Available remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Available remedies. 488.406 Section 488.406 Public... Long-Term Care Facilities with Deficiencies § 488.406 Available remedies. (a) General. In addition to the remedy of termination of the provider agreement, the following remedies are available: (1...

  4. 42 CFR 488.406 - Available remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Available remedies. 488.406 Section 488.406 Public... Long-Term Care Facilities with Deficiencies § 488.406 Available remedies. (a) General. In addition to the remedy of termination of the provider agreement, the following remedies are available: (1...

  5. 37 CFR 251.39 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Remedies. 251.39 Section 251.39 Patents, Trademarks, and Copyrights COPYRIGHT OFFICE, LIBRARY OF CONGRESS COPYRIGHT ARBITRATION... Conduct § 251.39 Remedies. In addition to those provided above, remedies for the violation of the...

  6. 24 CFR 570.913 - Other remedies for noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Other remedies for noncompliance. 570.913 Section 570.913 Housing and Urban Development Regulations Relating to Housing and Urban... § 570.913 Other remedies for noncompliance. (a) Action to enforce compliance. When the Secretary acts to...

  7. 40 CFR 35.6070 - Indian Tribe-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Indian Tribe-lead pre-remedial... Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6070 Indian Tribe-lead pre-remedial Cooperative Agreements. The Indian Tribe must comply with all of the requirements...

  8. 40 CFR 35.6070 - Indian Tribe-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Indian Tribe-lead pre-remedial... Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6070 Indian Tribe-lead pre-remedial Cooperative Agreements. The Indian Tribe must comply with all of the requirements...

  9. 40 CFR 35.6070 - Indian Tribe-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Indian Tribe-lead pre-remedial... Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6070 Indian Tribe-lead pre-remedial Cooperative Agreements. The Indian Tribe must comply with all of the requirements...

  10. 40 CFR 35.6070 - Indian Tribe-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Indian Tribe-lead pre-remedial... Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6070 Indian Tribe-lead pre-remedial Cooperative Agreements. The Indian Tribe must comply with all of the requirements...

  11. 40 CFR 35.6070 - Indian Tribe-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Indian Tribe-lead pre-remedial... Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6070 Indian Tribe-lead pre-remedial Cooperative Agreements. The Indian Tribe must comply with all of the requirements...

  12. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. Superfund record of decision (EPA Region 5): Spickler Landfill, Spencer, WI. (First remedial action), June 1992. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 10-acre Spickler Landfill site is an inactive municipal and industrial landfill located in Spencer, Marathon County, Wisconsin. The site consists of a mercury brine pit and two fill areas called the Old and New Fill Areas. In 1974, the state ordered the owners of the site to terminate operations and close the landfill. The ROD provides a final remedy for the first operable unit (OU1), which consists of the mercury brine pit, and the landfill. The primary contaminants of concern affecting the soil and sludge are VOCs, including benzene, PCE, toluene, and xylenes; other organics, including pesticides; metals, includingmore » arsenic, chromium, and lead; and other inorganics, including asbestos. The selected remedial action for the operable unit includes solidifying and/or stabilizing wastes in the mercury brine pit based on treatability test results, followed by installing and maintaining an impermeable and a solid waste cap over the New and Old Fill areas.« less

  14. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    EPA Science Inventory

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  15. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  16. Remedial Investigation Report Area of Contamination (AOC) 43G. Volume 1

    DTIC Science & Technology

    1996-02-01

    FORT DEVENS FINAL REMEDIAL INVESTIGATION FOR GROUP 2 & 7 SITES FINAL REMEDIAL INVESTIGATION REPORT AREA OF CONTAMINATION ( AOC ) 43G VOLUME I OF II...Liability Act for environmental investigations and remedial actions at Fort Devens . The agreement required that Site Investigations be undertaken at each... Remedial Investigation (RI) Report on Area of Contamination ( AOC ) 43G at the Fort Devens U.S. Army Installation, Massachusetts (

  17. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-02-01

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptablemore » regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  18. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-12-31

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment - various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ tomore » acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field preliminary results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  19. Federal government information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organizationmore » and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.« less

  20. Decentralized State Estimation and Remedial Control Action for Minimum Wind Curtailment Using Distributed Computing Platform

    DOE PAGES

    Liu, Ren; Srivastava, Anurag K.; Bakken, David E.; ...

    2017-08-17

    Intermittency of wind energy poses a great challenge for power system operation and control. Wind curtailment might be necessary at the certain operating condition to keep the line flow within the limit. Remedial Action Scheme (RAS) offers quick control action mechanism to keep reliability and security of the power system operation with high wind energy integration. In this paper, a new RAS is developed to maximize the wind energy integration without compromising the security and reliability of the power system based on specific utility requirements. A new Distributed Linear State Estimation (DLSE) is also developed to provide the fast andmore » accurate input data for the proposed RAS. A distributed computational architecture is designed to guarantee the robustness of the cyber system to support RAS and DLSE implementation. The proposed RAS and DLSE is validated using the modified IEEE-118 Bus system. Simulation results demonstrate the satisfactory performance of the DLSE and the effectiveness of RAS. Real-time cyber-physical testbed has been utilized to validate the cyber-resiliency of the developed RAS against computational node failure.« less

  1. Decentralized State Estimation and Remedial Control Action for Minimum Wind Curtailment Using Distributed Computing Platform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Ren; Srivastava, Anurag K.; Bakken, David E.

    Intermittency of wind energy poses a great challenge for power system operation and control. Wind curtailment might be necessary at the certain operating condition to keep the line flow within the limit. Remedial Action Scheme (RAS) offers quick control action mechanism to keep reliability and security of the power system operation with high wind energy integration. In this paper, a new RAS is developed to maximize the wind energy integration without compromising the security and reliability of the power system based on specific utility requirements. A new Distributed Linear State Estimation (DLSE) is also developed to provide the fast andmore » accurate input data for the proposed RAS. A distributed computational architecture is designed to guarantee the robustness of the cyber system to support RAS and DLSE implementation. The proposed RAS and DLSE is validated using the modified IEEE-118 Bus system. Simulation results demonstrate the satisfactory performance of the DLSE and the effectiveness of RAS. Real-time cyber-physical testbed has been utilized to validate the cyber-resiliency of the developed RAS against computational node failure.« less

  2. CONCEPTUAL BASIS FOR NATURAL ATTENUATION (NA) AS REMEDIATION APPROACH

    EPA Science Inventory

    As used in enforcement actions at hazardous waste sites by U.S. EPA, monitored natural attenuation is a remedy fully equivalent to any other remedy. The acceptance of MNA is based on three lines of evidence: historical ground water and/or soil chemistry data that demonstrates a ...

  3. 30 CFR 270.7 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Remedies. 270.7 Section 270.7 Mineral Resources... NONDISCRIMINATION IN THE OUTER CONTINENTAL SHELF § 270.7 Remedies. In addition to the penalties available under 30 CFR part 250, subpart N of this title, the Director may invoke any other remedies available to him or...

  4. 30 CFR 270.7 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Remedies. 270.7 Section 270.7 Mineral Resources... SHELF § 270.7 Remedies. In addition to the penalties available under 30 CFR part 250, subpart N of this title, the Director may invoke any other remedies available to him or her under the Act or regulations...

  5. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to theirmore » water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.« less

  6. 48 CFR 1803.906 - Remedies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... tried by the court with a jury. An action under this authority may not be brought more than two years... rights and remedies provided for in this subpart may not be waived by any agreement, policy, form, or...

  7. 42 CFR 460.48 - Additional actions by CMS or the State.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Sanctions, Enforcement Actions, and Termination § 460.48 Additional actions by...

  8. 42 CFR 460.48 - Additional actions by CMS or the State.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Sanctions, Enforcement Actions, and Termination § 460.48 Additional actions by...

  9. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. 48 CFR 225.370-5 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Remedies. 225.370-5 Section 225.370-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... States 225.370-5 Remedies. (a) In addition to other remedies available to the Government— (1) The...

  11. Strategic considerations for the sustainable remediation of nuclear installations.

    PubMed

    Mobbs, S; Orr, P; Weber, I

    2017-08-05

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable the sites or parts of the sites to be reused. Although this is relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic detriments and benefits that should be taken into account. Recent experience of OECD Nuclear Energy Agency (NEA) member countries in the remediation of contaminated land, predominantly contaminated soil and groundwater, on nuclear sites during decommissioning has been assessed by an NEA task group. The experience was used to identify strategic considerations for nuclear site remediation, to consider the application of sustainability principles to nuclear site remediation, to describe good practice, and to make recommendations for further research and development. The key aspects that were identified were that 1) site remediation should be sustainable by resulting in an overall net benefit; and 2) an adaptive approach is essential in order to take into account the inherent uncertainty associated with the decommissioning and site remediation timescales. A report describing the findings was published by OECD/NEA in 2016. The conclusions provide insights to decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so that they can achieve sustainable remediation of nuclear sites, now and in the future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. 48 CFR 2009.570-10 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Remedies. 2009.570-10... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-10 Remedies. In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or...

  13. 48 CFR 2009.570-10 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Remedies. 2009.570-10... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-10 Remedies. In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or...

  14. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  15. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  16. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  17. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  18. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  19. Superfund Record of Decision (EPA Region 1): Baird and McGuire, Holbrook, Massachusetts (Third remedial action), September 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-09-14

    The Baird McGuire site is a former chemical manufacturing facility in northwest Holbrook, Massachusetts, approximately 14 miles south of Boston. From 1912 to 1983 the company operated a chemical manufacturing and batching facility on the property. Manufactured products included herbicides, pesticides, disinfectants, soaps, floor waxes and solvents. Waste disposal methods at the site included direct discharge into the soil, nearby brook and wetlands, and a former gravel pit (now covered) in the eastern portion of the site. Underground disposal systems were also used. EPA also conducted an Initial Remedial Measure at the site from 1985 through 1987 which involved constructingmore » a new water main to direct water away from the site, removing building structures, and installing a temporary cap. In 1986 a Record of Decision (ROD) was signed to address onsite ground water treatment and incineration of contaminated soil. This ROD addresses the Cochato River sediment contamination. The primary contaminants of concern affecting the sediment are organics including PAHs and pesticides, and metals including arsenic. The selected remedial action for the site are included.« less

  20. Superfund Record of Decision (EPA Region 5): Midco II, Gary, IN. (First remedial action), (amendment), April 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 7-acre Midco II site is an abandoned chemical waste storage and disposal facility in Gary, Indiana. Land use in the surrounding area is predominantly industrial. The underlying aquifer, which is used primarily for non-drinking purposes, is highly susceptible to contamination from surface sources. From 1976 to 1978, the site was used for treatment, storage, and disposal of chemical and bulk liquid wastes. The ROD amends a 1989 ROD that addressed the remaining contaminated soil, pit wastes, and ground water by treatment of an estimated 35,000 cubic yards of soil wastes. The amended remedy reduces the estimated amount of soilmore » to be treated, as a result of new information on arsenic data and amended soil CALs, further defines the site cover requirements, and further defines the requirements for deep well injection of contaminated ground water. The primary contaminants of concern affecting the subsurface soil, sediment, and ground water are VOCs, including methylene chloride, benzene, toluene, TCE, and xylenes; other organics, including PCBs, phenols, and PAHs; and metals, including chromium, and lead. The amended remedial action for the ROD is included.« less

  1. Superfund Record of Decision (EPA Region 8): Anaconda Smelter site, (Operable Unit 11 - Flue Dust), Deer Lodge County, Anaconda, MT. (Second remedial action), September 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-23

    The 6,000-acre Anaconda Smelter site is a former copper and ore processing facility in Deer Lodge County, Montana. Land use in the area is predominantly residential. The site is bounded on the north and east, respectively, by the Warm Springs Creek and Mill Creek, both of which are potential sources of drinking water. From 1884 until 1980 when activities ceased, the site was used for ore processing and smelting operations. In 1988, EPA conducted an investigation to determine the nature and extent of the flue dust contamination. A 1988 ROD addressed the Mill Creek Operable Unit (OU15) and documented themore » relocation of residents from the community surrounding the smelter site as the selected remedial action. The Record of Decision (ROD) addresses the Flue Dust Operable Unit (OU11). The primary contaminants of concern affecting this site from the flue dust materials are metals including arsenic, cadmium, and lead. The selected remedial action for the site is included.« less

  2. Remediation and its effect represented on long term monitoring data at a chlorinated ethenes contaminated site, Wonju, Korea

    NASA Astrophysics Data System (ADS)

    Lee, Seong-Sun; Lee, Seung Hyun; Lee, Kang-Kun

    2016-04-01

    A research for the contamination of chlorinated ethenes such as trichloroethylene (TCE) at an industrial complex, Wonju, Korea, was carried out based on 17 rounds of groundwater quality data collection from 2009 to 2015. Remediation technologies such as soil vapor extraction, soil flushing, biostimulation, and pump-and-treat have been applied to eliminate the contaminant sources of trichloroethylene (TCE) and to prevent the migration of TCE plume from remediation target zones to groundwater discharge area like a stream. The remediation efficiency according to the remedial actions was evaluated by tracing a time-series of plume evaluation and temporal mass discharge at three transects (Source, Transect-1, Transect-2) which was assigned along the groundwater flow path. Also, based on long term monitoring data, dissolved TCE concentration and mass of residual TCE in the initial stage of disposal were estimated to evaluate the efficiency of in situ remediation. The results of temporal and spatial monitoring before remedial actions showed that a TCE plume originating from main and local source zones continues to be discharged to a stream. However, from the end of intensive remedial actions from 2012 to 2013, the aqueous concentrations of TCE plume present at and around the main source areas decreased significantly. Especially, during the intensive remediation period, the early average mass discharge (26.58 g/day) at source transect was decreased to average 4.99 g/day. Estimated initial dissolved concentration and residual mass of TCE in the initial stage of disposal decreased rapidly after an intensive remedial action in 2013 and it is expected to be continuously decreased from the end of remedial actions to 2020. This study demonstrates that long term monitoring data are useful in assessing the effectiveness of remedial actions at chlorinated ethenes contaminated site. Acknowledgements This project is supported by the Korea Ministry of Environment under "The GAIA

  3. Transmittal of EPA Guidance on the Transfer of Federal Property by Deed Before All Necessary Remedial Action Has Been Taken Pursuant to CERCLA Section 120(h)(3)

    EPA Pesticide Factsheets

    This guidance is for the EPA Regions to use when reviewing requests from federal departments and agencies that are transferring property to defer the CERCLA Section 120(h)(3) covenant that all necessary remedial actions have been taken.

  4. Remedial investigation report for J-Field, Aberdeen Proving Ground, Maryland. Volume 1: Remedial investigation results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuen, C. R.; Martino, L. E.; Biang, R. P.

    2000-03-14

    This report presents the results of the remedial investigation (RI) conducted at J-Field in the Edgewood Area of Aberdeen Proving Ground (APG), a U.S. Army installation located in Harford County, Maryland. Since 1917, activities in the Edgewood Area have included the development, manufacture, and testing of chemical agents and munitions and the subsequent destruction of these materials at J-Field by open burning and open detonation. These activities have raised concerns about environmental contamination at J-Field. This RI was conducted by the Environmental Conservation and Restoration Division, Directorate of Safety, Health and Environmental Division of APG, pursuant to requirements outlined undermore » the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA). The RI was accomplished according to the procedures developed by the U.S. Environmental Protection Agency (EPA 1988). The RI provides a comprehensive evaluation of the site conditions, nature of contaminants present, extent of contamination, potential release mechanisms and migration pathways, affected populations, and risks to human health and the environment. This information will be used as the basis for the design and implementation of remedial actions to be performed during the remedial action phase, which will follow the feasibility study (FS) for J-Field.« less

  5. Modeling to optimize operational practices to limit shallow dose and dose to the lens at the Weldon Spring Site Remedial Action Project.

    PubMed

    Hillman, D J; Green, S W

    1994-10-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) began remediation of its chemical plant buildings in June 1992. The chemical plant was used by the Atomic Energy Commission in the 1950's and 1960's to process uranium ore and natural thorium. Many remaining equipment surfaces were highly contaminated with uranium and thorium product residues, which are relatively weak gamma emitters, but are strong beta emitters that deposit the majority of their energy within the first centimeter of tissue. An essential part of the remediation, therefore, is to control the dose to the skin, extremities, and the lens of the eye from the broad range of betas emitted by uranium and thorium decay series radionuclides. The WSSRAP planned to quantitatively record the dose to the skin, extremities, and the lens of the eye, when warranted, through selection and use of appropriate passive dosimeters. That would not, however, constitute control. A direct-reading instrument was needed that could be used by field technicians to anticipate and prevent work methods and situations that would otherwise result in the unnecessary commitment of dose. However, the interpretation of real-time instrument readings produced by a broad spectrum of beta energies is typically challenging at best, particularly when the shallow dose rate and the lens dose rate are both of interest. The purpose of this effort was, therefore, to (1) select a direct-reading instrument for use in the buildings that could be used to provide rule-of-thumb action levels for field technicians, which, if exceeded, would warrant worker protective measures; (2) determine the approximate conversions between the instrument readings and the shallow (including extremity) dose rate and lens of the eye dose rate; and (3) specify protective measures and dosimetry for the lens of the eye, if warranted. Methods described in the literature are used to estimate action levels for direct instrument readings and to demonstrate that lens

  6. Remedial training: Will CRM work for everyone

    NASA Technical Reports Server (NTRS)

    Johnston, A. N.

    1987-01-01

    The subject of those pilots who seem unresponsive to Cockpit Resource Management (CRM) training is addressed. Attention is directed to the need and opportunity for remedial action. Emphasis is given to the requirement for new perspectives and additional training resources. It is also argued that, contrary to conventional training wisdom, such individuals do not represent a hard core which is beyond assistance. Some evidence is offered that such a new perspective will lend itself to a wider appreciation of certain specific training needs. The role of appropriately trained specialists is briefly outlined, and a selected bibliography is attached. The combined experiences of several Pilot Advisory Groups (PAG's) within IFALPA member association form the basis for this discussion. It does not purport to desribe the activities of any one PAG. While much of the activities of PAG's have no relevance to CRM, there are clearly some very important points of intersection. The relevance of these points to diagnostic skills, and remedial training in the general domain of CRM is made obvious.

  7. Guidelines for asbestos remediation at Italian superfund sites.

    PubMed

    Paglietti, F; Malinconico, S; Di Molfetta, V; Giangrasso, M

    2012-01-01

    Asbestos is now banned in 52 countries. Although Italy banned asbestos in 1992, up until that date it had been one of the main producer nations of asbestos and asbestos-containing materials, and asbestos-related contamination is still widespread in the country. To reduce asbestos-related health effects, Italy has adopted many laws and regulations regarding exposure thresholds and remediation tools. Even so, there are legislative gaps that are making it difficult to manage related risks especially in the operative phase. The lack of standard procedures at a national level regarding emergency shutdown and remediation as well as reference thresholds for specific risk situations creates difficulties and different actions when dealing with the cleanup of Italian asbestos superfund sites. The authors propose operative guidelines for asbestos remediation at Italian superfund sites. INAIL, the reference national organization for asbestos-related matters, acting as an advisor to a number of state, regional, and local authorities, examined the main asbestos-related risk situations in Italy and proposed the most appropriate actions to take. The detailed analysis of many actual cases of risk, in part through inspections and the management of cleanup actions at asbestos Italian superfund sites, resulted in proposals to modify existing procedures and thresholds, which were subsequently discussed with all national, regional, and local scientific bodies. After more than two years of work and discussion at a national level, INAIL-DIPIA-Asbestos Group drafted new Guidelines for Asbestos Remediation at Italian Superfund sites, and officially submitted them to the Environment Ministry. The Ministry then adopted the document in regard to all asbestos Italian superfunds. This recently released document is also a useful reference for contaminated sites at a regional and local level. The operative Guidelines for Asbestos Remediation at Italian Superfund sites may also be of use at an

  8. 32 CFR 505.12 - Privacy Act enforcement actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 3 2013-07-01 2013-07-01 false Privacy Act enforcement actions. 505.12 Section... AUTHORITIES AND PUBLIC RELATIONS ARMY PRIVACY ACT PROGRAM § 505.12 Privacy Act enforcement actions. (a.... (1) Civil remedies. The DA is subject to civil remedies for violations of the Privacy Act. In...

  9. 32 CFR 505.12 - Privacy Act enforcement actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Privacy Act enforcement actions. 505.12 Section... AUTHORITIES AND PUBLIC RELATIONS ARMY PRIVACY ACT PROGRAM § 505.12 Privacy Act enforcement actions. (a.... (1) Civil remedies. The DA is subject to civil remedies for violations of the Privacy Act. In...

  10. 32 CFR 505.12 - Privacy Act enforcement actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Privacy Act enforcement actions. 505.12 Section... AUTHORITIES AND PUBLIC RELATIONS ARMY PRIVACY ACT PROGRAM § 505.12 Privacy Act enforcement actions. (a.... (1) Civil remedies. The DA is subject to civil remedies for violations of the Privacy Act. In...

  11. 32 CFR 505.12 - Privacy Act enforcement actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Privacy Act enforcement actions. 505.12 Section... AUTHORITIES AND PUBLIC RELATIONS ARMY PRIVACY ACT PROGRAM § 505.12 Privacy Act enforcement actions. (a.... (1) Civil remedies. The DA is subject to civil remedies for violations of the Privacy Act. In...

  12. Preferential Remedies for Employment Discrimination

    ERIC Educational Resources Information Center

    Edwards, Harry T.; Zaretsky, Barry L.

    1975-01-01

    An overview of the problem of preferential remedies to achieve equal employment opportunities for women and minority groups. Contends that "color blindness" will not end discrimination but that some form of "color conscious" affirmative action program must be employed. Temporary preferential treatment is justified, according to…

  13. Superfund Record of Decision (EPA Region 7): Lehigh Portland Cement Company, Mason City, IA. (First remedial action), June 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-06-28

    The Lehigh Portland Cement site is composed of two areas: the 150-acre Lehigh Portland Cement Company (LPCC) cement production facility, and the 410-acre Lime Creek Nature Center (LCNC), in Mason, Gordo County, Iowa. The site overlies an aquifer that serves as a source of water for 12 nearby wells; and municipal water is obtained from a deeper aquifer. Calmus Creek borders the site and discharges to the Winnebago River, located within a mile of the site. From 1911 to the present, the LPCC has manufactured cement products. In 1981, hydrochemical tests of Blue Waters Pond on the LPCC area indicatedmore » high alkalinity. The Record of Decision (ROD) addresses the Cement Kiln Dust ground water, and surface water as a final remedy. Elevated pH of ground water and surface water also is of potential concern. The selected remedial action for all are included.« less

  14. Risk-based economic decision analysis of remediation options at a PCE-contaminated site.

    PubMed

    Lemming, Gitte; Friis-Hansen, Peter; Bjerg, Poul L

    2010-05-01

    Remediation methods for contaminated sites cover a wide range of technical solutions with different remedial efficiencies and costs. Additionally, they may vary in their secondary impacts on the environment i.e. the potential impacts generated due to emissions and resource use caused by the remediation activities. More attention is increasingly being given to these secondary environmental impacts when evaluating remediation options. This paper presents a methodology for an integrated economic decision analysis which combines assessments of remediation costs, health risk costs and potential environmental costs. The health risks costs are associated with the residual contamination left at the site and its migration to groundwater used for drinking water. A probabilistic exposure model using first- and second-order reliability methods (FORM/SORM) is used to estimate the contaminant concentrations at a downstream groundwater well. Potential environmental impacts on the local, regional and global scales due to the site remediation activities are evaluated using life cycle assessments (LCA). The potential impacts on health and environment are converted to monetary units using a simplified cost model. A case study based upon the developed methodology is presented in which the following remediation scenarios are analyzed and compared: (a) no action, (b) excavation and off-site treatment of soil, (c) soil vapor extraction and (d) thermally enhanced soil vapor extraction by electrical heating of the soil. Ultimately, the developed methodology facilitates societal cost estimations of remediation scenarios which can be used for internal ranking of the analyzed options. Despite the inherent uncertainties of placing a value on health and environmental impacts, the presented methodology is believed to be valuable in supporting decisions on remedial interventions. Copyright 2010 Elsevier Ltd. All rights reserved.

  15. Superfund record of decision (EPA Region 10): Elmendorf Air Force Base, Operable Unit 2, source area ST41, Anchorage, AK. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    The 13,130-acre Elmendorf Air Force Base (AFB) site is located adjacent to the municipality of Anchorage, Alaska. From 1940 to 1991, Elmendorf AFB used a 20-acre portion of the site, referred to as source area ST41, to store the fuel product JP-4 and aviation gasoline in four 1-million gallon underground tanks. As a result of numerous leaks and above-ground spills since the tanks were installed in the 1940s, USAF conducted investigations through its Installation Restoration Program (IRP). These investigations revealed several hundred thousand gallons of fuel in the ground water and soil. The ROD addresses an interim remedy at Elmendorfmore » AFB. The action is needed to reduce further spread of fuel constituents through the recovery of floating product on the ground water surface, and containment of seeps. Future RODs will include a final remedy for ground water and soil at ST41, as OU2, and will address the other six OUs at the site. The primary contaminants of concern affecting the ground water at ST41 are the compounds in JP-4, especially VOCs such as benzene, toluene, and xylenes. The selected interim remedial action for the site are included.« less

  16. ISS Internal Active Thermal Control System (IATCS) Coolant Remediation Project

    NASA Technical Reports Server (NTRS)

    Morrison, Russell H.; Holt, Mike

    2005-01-01

    The IATCS coolant has experienced a number of anomalies in the time since the US Lab was first activated on Flight 5A in February 2001. These have included: 1) a decrease in coolant pH, 2) increases in inorganic carbon, 3) a reduction in phosphate buffer concentration, 4) an increase in dissolved nickel and precipitation of nickel salts, and 5) increases in microbial concentration. These anomalies represent some risk to the system, have been implicated in some hardware failures and are suspect in others. The ISS program has conducted extensive investigations of the causes and effects of these anomalies and has developed a comprehensive program to remediate the coolant chemistry of the on-orbit system as well as provide a robust and compatible coolant solution for the hardware yet to be delivered. The remediation steps include changes in the coolant chemistry specification, development of a suite of new antimicrobial additives, and development of devices for the removal of nickel and phosphate ions from the coolant. This paper presents an overview of the anomalies, their known and suspected system effects, their causes, and the actions being taken to remediate the coolant.

  17. 10 CFR 1706.10 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Remedies. 1706.10 Section 1706.10 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.10 Remedies. The refusal to provide the certificate, or upon request of the contracting officer the additional written...

  18. 10 CFR 1706.10 - Remedies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Remedies. 1706.10 Section 1706.10 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.10 Remedies. The refusal to provide the certificate, or upon request of the contracting officer the additional written...

  19. 10 CFR 1706.10 - Remedies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Remedies. 1706.10 Section 1706.10 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.10 Remedies. The refusal to provide the certificate, or upon request of the contracting officer the additional written...

  20. 10 CFR 1706.10 - Remedies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Remedies. 1706.10 Section 1706.10 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.10 Remedies. The refusal to provide the certificate, or upon request of the contracting officer the additional written...

  1. 10 CFR 1706.10 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Remedies. 1706.10 Section 1706.10 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.10 Remedies. The refusal to provide the certificate, or upon request of the contracting officer the additional written...

  2. FEASIBILITY OF HYDRAULIC FRACTURING OF SOILS TO IMPROVE REMEDIAL ACTIONS

    EPA Science Inventory

    Hydraulic fracturing, a technique commonly used to increase the yields of oil wells, could improve the effectiveness of several methods of in situ remediation. This project consisted of laboratory and field tests in which hydraulic fractures were created in soil. Laboratory te...

  3. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an abovegroundmore » structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)« less

  4. Superfund Record of Decision (EPA Region 1): Baird and McGuire, MA. (Third remedial action), September 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-09-14

    The Baird and McGuire site is a former chemical manufacturing facility in northwest Holbrook, Massachusetts, approximately 14 miles south of Boston. From 1912 to 1983 the company operated a chemical manufacturing and batching facility on the property. Manufactured products included herbicides, pesticides, disinfectants, soaps, floor waxes and solvents. Waste disposal methods at the site included direct discharge into the soil, nearby brook and wetlands, and a former gravel pit (now covered) in the eastern portion of the site. EPA conducted a removal action at the site in 1983 after a waste lagoon overflowed spreading contaminants into the Cochato River. Themore » company ceased operating shortly thereafter. A second removal action was conducted in 1985, following the discovery of dioxin in site soils. EPA also conducted an Initial Remedial Measure at the site from 1985 through 1987 which involved constructing a new water main to direct water away from the site, removing building structures, and installing a temporary cap. The primary contaminants of concern affecting the sediment are organics including PAHs and pesticides, and metals including arsenic.« less

  5. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  6. 24 CFR 30.15 - Application of other remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Application of other remedies. 30... remedies. A civil money penalty may be imposed in addition to other administrative sanctions or any other civil remedy or criminal penalty. ...

  7. What does remediation and probation status mean? A survey of emergency medicine residency program directors.

    PubMed

    Weizberg, Moshe; Smith, Jessica L; Murano, Tiffany; Silverberg, Mark; Santen, Sally A

    2015-01-01

    Emergency medicine (EM) residency program directors (PDs) nationwide place residents on remediation and probation. However, the Accreditation Council for Graduate Medical Education and the EM PDs have not defined these terms, and individual institutions must set guidelines defining a change in resident status from good standing to remediation or probation. The primary objective of this study was to determine if EM PDs follow a common process to guide actions when residents are placed on remediation and probation. An anonymous electronic survey was distributed to EM PDs via e-mail using SurveyMonkey to determine the current practice followed after residents are placed on remediation or probation. The survey queried four designations: informal remediation, formal remediation, informal probation, and formal probation. These designations were compared for deficits in the domains of medical knowledge (MK) and non-MK remediation. The survey asked what process for designation exists and what actions are triggered, specifically if documentation is placed in a resident's file, if the graduate medical education (GME) office is notified, if faculty are informed, or if resident privileges are limited. Descriptive data are reported. Eighty-one of 160 PDs responded. An official policy on remediation and/or probation was reported by 41 (50.6%) programs. The status of informal remediation is used by 73 (90.1%), 80 (98.8%) have formal remediation, 40 (49.4%) have informal probation, and 79 (97.5%) have formal probation. There was great variation among PDs in the management and definition of remediation and probation. Between 81 and 86% of programs place an official letter into the resident's file regarding formal remediation and probation. However, only about 50% notify the GME office when a resident is placed on formal remediation. There were no statistical differences between MK and non-MK remediation practices. There is significant variation among EM programs regarding the

  8. 7 CFR 633.13 - Violations and remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Violations and remedies. 633.13 Section 633.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.13 Violations and remedies. (a) In... addition to any and all legal and equitable remedies as may be available to the NRCS under applicable law...

  9. 7 CFR 633.13 - Violations and remedies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Violations and remedies. 633.13 Section 633.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.13 Violations and remedies. (a) In... addition to any and all legal and equitable remedies as may be available to the NRCS under applicable law...

  10. Superfund Record of Decision (EPA Region 5): Allied Chemical and Ironton Coke, Ironton, OH. (Second remedial action), December 1990. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-12-28

    The 95-acre Allied Chemical and Ironton Coke site is comprised of a former coke plant and an operating tar plant in Ironton, Lawrence County, Ohio. The site is located within a coal mining region, and surrounding land use is predominantly industrial and residential. The ROD addresses contamination at all areas not previously addressed, and provides a final remedy at the site. The primary contaminants of concern affecting the soil, sediment, and ground water are VOCs including benzene; other organics including PAHs and phenols; metals including arsenic; and other inorganics including cyanide. The selected remedial action for this site includes excavatingmore » and incinerating onsite approximately 122,000 cubic yards of waste material from Lagoon 5, and 31,000 cubic yards of waste coal, followed by onsite waste fuel recovery and disposing of the residual ash offsite; in-situ bioremediation of approximately 475,000 cubic yards of waste material from Lagoons.« less

  11. 78 FR 53425 - Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF COMMERCE Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration.... ACTION: Notice of Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for... Assessment, Remediation, and Restoration Program (DARRP) is announcing new indirect cost rates on the...

  12. 40 CFR 35.6100 - Eligibility for remedial Cooperative Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6100 Eligibility for...

  13. 40 CFR 35.6100 - Eligibility for remedial Cooperative Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6100 Eligibility for...

  14. 40 CFR 35.6100 - Eligibility for remedial Cooperative Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6100 Eligibility for...

  15. 40 CFR 35.6100 - Eligibility for remedial Cooperative Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Remedial Response Cooperative Agreements § 35.6100 Eligibility for...

  16. EPA Guidance on the Transfer of Federal Property by Deed Before All Necessary Remedial Action Has Been Taken Pursuant to CERCLA Section 120(h)(3) -- (Early Transfer Authority Guidance)

    EPA Pesticide Factsheets

    This guidance addresses the transfer of real property listed on the National Priorities List (NPL) held by a federal agency where the release or disposal of hazardous substances has occurred, but where all necessary remedial action has not yet been taken.

  17. Homeopathy--between tradition and modern science: remedies as carriers of significance.

    PubMed

    Almirantis, Yannis

    2013-04-01

    The healing potential and description of homeopathic remedies, as determined in homeopathic pathogenic trials (HPTs) and verified by medical experience, are often found to be meaningfully connected with the symbolic content attributed to the original materials (tinctures, metals etc) through tradition or modern semantics. Such a connection is incompatible with a biomolecular mechanistic explanation of the healing action of remedies. The physiological effects of crude substances are often similar to the symptoms of illnesses cured by the corresponding homeopathic remedy. This is considered a manifestation of the similia principle. Evidence is brought here that in several cases the inverse situation occurs, with the healing properties of the crude substance and those of its homeopathic preparation partially coinciding, the remedy usually having broader healing properties. The existence of these two possibilities in the relationship of medicinal actions of remedy and the crude substance, offers evidence in favor of a direct involvement of the level of significances in the mechanism underlying the homeopathic phenomenon. Finally, an experimental methodology is proposed, which may bring the result of double-blind randomized studies for homeopathic remedies closer to the reported performance of homeopathy in real life medical practice. If successful, this method would be a further indication of a non-local, significance-related interpretation of homeopathy. Copyright © 2013 The Faculty of Homeopathy. Published by Elsevier Ltd. All rights reserved.

  18. Action Research of Computer-Assisted-Remediation of Basic Research Concepts.

    ERIC Educational Resources Information Center

    Packard, Abbot L.; And Others

    This study investigated the possibility of creating a computer-assisted remediation program to assist students having difficulties in basic college research and statistics courses. A team approach involving instructors and students drove the research into and creation of the computer program. The effect of student use was reviewed by looking at…

  19. Soil Contamination and Remediation Strategies. Current research and future challenge

    NASA Astrophysics Data System (ADS)

    Petruzzelli, G.

    2012-04-01

    Soil contamination: the heritage of industrial development Contamination is only a part of a whole set of soil degradation processes, but it is one of paramount importance since soil pollution greatly influences the quality of water, food and human health. Soil contamination has been identified as an important issue for action in the European strategy for soil protection, it has been estimated that 3.5 million of sites are potentially contaminated in Europe. Contaminated soils have been essentially discovered in industrial sites landfills and energy production plants, but accumulation of heavy metals and organic compounds can be found also in agricultural land . Remediation strategies. from incineration to bioremediation The assessment of soil contamination is followed by remedial action. The remediation of contaminated soils started using consolidates technologies (incineration inertization etc.) previously employed in waste treatment,. This has contributed to consider a contaminated soil as an hazardous waste. This rough approximation was unfortunately transferred in many legislations and on this basis soil knowledge have been used only marginally in the clean up procedures. For many years soil quality has been identified by a value of concentration of a contaminant and excavation and landfill disposal of soil has been largely used. In the last years the knowledge of remediation technology has rapidly grown, at present many treatment processes appear to be really feasible at field scale, and soil remediation is now based on risk assessment procedures. Innovative technologies, largely dependent on soil properties, such as in situ chemical oxidation, electroremediation, bioventing, soil vapor extraction etc. have been successfully applied. Hazardous organic compounds are commonly treated by biological technologies, biorememdiation and phytoremediation, being the last partially applied also for metals. Technologies selection is no longer exclusively based on

  20. Superfund Record of Decision (EPA Region 9): North Hollywood/Burbank Well Field Area 1, San Fernando Valley Site, California (first remedial action), September 1987. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-09-24

    The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selectedmore » remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.« less

  1. Superfund Record of Decision (EPA Region 3): William Dick Lagoons, West Caln Township, Chester County, PA. (First remedial action), June 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-28

    The 4.4-acre William Dick Lagoons site is a chemical wastewater disposal site in West Caln Township, Chester County, Pennsylvania. An estimated 30 residences located within 1,000 feet of the site use private wells for their drinking water supply. Two other Superfund sites are near the site. From the 1950's to 1970, Mr. William Dick used the lagoons to dispose of wastewater left from cleaning the interiors of chemical and petroleum tank trailers owned primarily by Chemical Leaman Tank Lines, (CLTL), and residual chemical products. Later in 1970, vandalism caused the release of an estimated 300,000 gallons of wastewater into Birchmore » Run, a tributary of the West Branch of Brandywine Creek. As a result of this discharge, more than 2,600 fish died, and water supplies that used Brandywine Creek as a water source were closed. The Record of Decision (ROD) provides an interim remedy and addresses contaminated residential water as Operable Unit 1 (OU1) and ground water as OU2. A future ROD will address source control and will provide a remedy for the cleanup of contaminated soil. The primary contaminants of concern affecting the ground water are VOCs including benzene, PCE, and TCE; other organics including phenols; and metals. The selected remedial action for the site is included.« less

  2. Adaptive management: a paradigm for remediation of public facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area

  3. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of amore » National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.« less

  4. Superfund Record of Decision (EPA Region 9): Watkins-Johnson (Stewart Division), Scotts Valley, California (first remedial action), Final report, June 29, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Watkins-Johnson site is an active research and development, manufacturing, and industrial complex in Santa Cruz County, five miles north of Santa Cruz, California. The Watkins-Johnson Company has owned and operated the complex since 1963, conducting such activities as: metal machining, degreasing, metal plating, and photo laboratory activities. During these activities, a variety of organics, inorganics and metals were used. The primary contaminants of concern affecting the soil and ground water are VOCs including PCE and TCE, and metals including silver. The selected remedial action for the site includes soil vapor (vacuum) extraction with pretreatment of extracted vapors using GACmore » prior to ambient discharge; capping and grading contaminated soil areas to minimize the potential for mobilization of soil contaminants to the ground water; installing infiltration leachfields to prevent offsite migration of ground water contaminants in the perched zone; installing gravity drains to transfer the contaminated ground water from the perched zone to the regional aquifer zone for subsequent extraction; ground water pumping and onsite treatment to remove contamination from both the perched and regional zones using GAC adsorption with offsite regeneration of spent carbon. The estimated present worth cost for this remedial action is $2,156,243, which includes an estimated annual O and M cost of $167,820.« less

  5. Superfund Record of Decision (EPA Region 2): Garden State Cleaners, Buena Borough, Atlantic County, NJ. (First remedial action), September 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-26

    The 3,000-square-foot Garden State Cleaners (GSC) site is an active dry cleaning operation in Minotola, Bueno Borough, Atlantic County, New Jersey. Land use in the area is residential and commercial, and local residents obtain drinking water from the Borough municipal water supply system. From 1966 to the present, dry cleaning activities using PCE were conducted at the GSC site, and until 1985, wastes were discharged through pipes directly into the ground. In 1984, State investigations showed elevated levels of PCE in ground water adjacent to and downgradient from the GSC and SJCC facilities, and elevated levels of PCE and TCEmore » in onsite soil. The selected remedial action for the site includes treating onsite approximately 1,600 cubic yards of contaminated soil using in-situ vapor extraction; treating the contaminated wastewater from the vapor extraction processes onsite using an air stripping column; treating air emissions using carbon adsorption units; pumping and onsite treatment of contaminated ground water using air stripping and carbon adsorption; reinjecting the treated ground water upgradient from the site; regenerating spent activated carbon from both treatment processes offsite; conducting long-term ground water monitoring; and implementing temporary institutional controls. The estimated present worth cost for the remedial action at the GSC site is $5,451,000, which includes an estimated annual O and M cost of $249,500 for 70 years.« less

  6. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  7. Evaluating the health benefits and cost-effectiveness of the radon remediation programme in domestic properties in Northamptonshire, UK.

    PubMed

    Denman, Antony; Groves-Kirkby, Christopher; Coskeran, Thomas; Parkinson, Steven; Phillips, Paul; Tornberg, Roges

    2005-08-01

    are generally those who do not take action. In addition, a recent survey of risk perception shows an extremely wide range of public perception of radon risk, a perception that has not been significantly altered by public health campaigns. These predictions have profound effects, both on our previous analysis, particularly since only limited numbers of householders test their homes and even fewer remediate if they discover raised levels, and also on the public health strategies for this risk.

  8. 2011 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation, Oak Ridge, Tennessee - Data and Evaluations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-03-01

    Under the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency, (EPA) and the Tennessee Department of Environment and Conservation (TDEC) in 1992, all environmental restoration activities on the ORR are performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Since the 1990s, the environmental restoration activities have experienced a gradual shift from characterization to remediation. As this has occurred, it has been determined that the assessment of the individual and cumulative performance of all ORR CERCLA remedial actionsmore » (RAs) is most effectively tracked in a single document. The Remediation Effectiveness Report (RER) is an FFA document intended to collate all ORR CERCLA decision requirements, compare pre- and post-remediation conditions at CERCLA sites, and present the results of any required post-decision remediation effectiveness monitoring. First issued in 1997, the RER has been reissued annually to update the performance histories of completed actions and to add descriptions of new CERCLA actions. Monitoring information used in the 2011 RER to assess remedy performance was collected and/or compiled by DOE's Water Resources Restoration Program (WRRP). Only data used to assess performance of completed actions are provided. In addition to collecting CERCLA performance assessment data, the WRRP also collects baseline data to be used to gauge the effectiveness of future actions once implemented. These baseline data are maintained in the Oak Ridge Environmental Information System and will be reported in future RERs, as necessary, once the respective actions are completed. However, when insufficient data exist to assess the impact of the RAs, e.g., when the RA was only recently completed, a preliminary evaluation is made of early indicators of effectiveness at the

  9. Superfund Record of Decision (EPA Region 3): Voortman Farm Site, Lehigh County, Pennsylvania (first remedial action) June 1988. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-06-30

    The 43-acre Voortman Farm site is located in Upper Salucon Township, Lehigh County, Pennsylvania. The site consists of a sinkhole that contained empty battery casings disposed of in late 1979 and early 1980. Citizen complaints in 1980 prompted the prohibition of dumping and subsequent site investigation. In September 1986, the battery casings in the sinkhole caught on fire. Since the battery casings were burning underground, attempts to extinguish the fire remained unsuccessful. There does not appear to be any leaching from any residual metals, contaminated soils or battery casings present. The selected remedial action for the site is included.

  10. 47 CFR 1.1906 - Informal action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Informal action. 1.1906 Section 1.1906... United States General Provisions § 1.1906 Informal action. Nothing contained in these regulations is intended to preclude utilization of informal administrative actions or remedies which may be available...

  11. 47 CFR 1.1906 - Informal action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Informal action. 1.1906 Section 1.1906... United States General Provisions § 1.1906 Informal action. Nothing contained in these regulations is intended to preclude utilization of informal administrative actions or remedies which may be available...

  12. Lead remediation and changes in human lead exposure: some physiological and biokinetic dimensions.

    PubMed

    Mushak, Paul

    2003-02-15

    This paper presents a qualitative and quantitative analysis of the various aspects of lead remediation effectiveness with particular reference to human health risk assessment. One of the key elements of lead remediation efforts at such sites as those under the Superfund program deals with populations at elevated exposure and toxicity risk in the proximity of, or at, the site of remediation, especially remediation workers, workers at other tasks on sites that were remediated down to some action level of lead concentration in soils, and groups at risk in nearby communities. A second element has to do with how one measures or models lead exposure changes with special reference to baseline and post-remediation conditions. Various biomarkers of lead exposure can be employed, but their use requires detailed knowledge of what results using each means. The most commonly used approach is measurement of blood lead (Pb-B). Recognized limitations in the use of Pb-B has led to the use of predictive Pb exposure models, which are less vulnerable to the many behavioral, physiological, and environmental parameters that can distort isolated or 'single shot' Pb-B testings. A third aspect covered in this paper presents various physiological factors that affect the methods by which one evaluates Pb remediation effectiveness. Finally, this article offers an integrated look at how lead remediation actions directed at one lead source or pathway affect the total lead exposure picture for human populations at elevated lead exposure and toxicity risk.

  13. 29 CFR 1450.6 - Informal action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Informal action. 1450.6 Section 1450.6 Labor Regulations... UNITED STATES General Provisions § 1450.6 Informal action. Nothing contained in this regulation is intended to preclude utilization of informal administrative actions or remedies which may be available. ...

  14. Social and ethical issues in environmental remediation projects.

    PubMed

    Oughton, D H

    2013-05-01

    The contamination of environments with radionuclides can give rise to consequences that encompass far more than health risks from exposure to radiation. As experience from Chernobyl demonstrated, both the accident and remediation measures can have serious social and economic consequences. This paper presents a review of some of these issues, including their ethical relevance, and presents a check-list of socio-ethical aspects of remediation measures. The paper concludes with an overview of social remediation measures, encompassing actions that are directed towards benefits other than dose reduction (e.g., local food monitoring stations or medical check-up), or measures that require social rather than technical implementation (e.g. information centres, stakeholder dialogue). Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. Multi-Action Planning for Threat Management: A Novel Approach for the Spatial Prioritization of Conservation Actions

    PubMed Central

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J.; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms. PMID:26020794

  16. Multi-action planning for threat management: a novel approach for the spatial prioritization of conservation actions.

    PubMed

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms.

  17. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmentalmore » and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.« less

  18. Design of Remediation Actions for Nutrient Mitigation in the Hyporheic Zone

    NASA Astrophysics Data System (ADS)

    Morén, I.; Wörman, A.; Riml, J.

    2017-11-01

    Although hyporheic exchange has been shown to be of great importance for the overall water quality of streams, it is rarely considered quantitatively in stream remediation projects. A main driver of hyporheic exchange is the hydraulic head fluctuation along the streambed, which can be enhanced by modifications of the streambed topography. Here we present an analytical 2-D spectral subsurface flow model to estimate the hyporheic exchange associated with streambed topographies over a wide range of spatial scales; a model that was validated using tracer-test-results and measurements of hydraulic conductivity. Specifically, engineered steps in the stream were shown to induce a larger hyporheic exchange velocity and shorter hyporheic residence times compared to the observed topography in Tullstorps Brook, Sweden. Hyporheic properties were used to parameterize a longitudinal transport model that accounted for reactions in terms of first-order decay and instantaneous adsorption. Theoretical analyses of the mitigation effect for nitrate due to denitrification in the hyporheic zone show that there is a Damköhler number of the hyporheic zone, associated with several different stream geomorphologies, that optimizes nitrate mass removal on stream reach scale. This optimum can be limited by the available hydraulic head gradient given by the slope of the stream and the geological constraints of the streambed. The model illustrates the complex interactions between design strategies for nutrient mitigation, hyporheic flow patterns, and stream biogeochemistry and highlights the importance to diagnose a stream prior remediation, specifically to evaluate if remediation targets are transport or reaction controlled.

  19. Superfund Record of Decision (EPA Region 9): Coalinga Asbestos Mine, Fresno County, CA. (Second remedial action), September 1990. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 557-acre Coalinga Asbestos Mine site, a former asbestos processing area and chromite mine, comprises part of the Johns Manville Coalinga Asbestos Mill site in western Fresno County, California. This rural mountainous area is used primarily for recreational purposes. From 1962 to 1974, asbestos ore from several local mines was processed and sorted onsite, and the resulting asbestos mill tailings were periodically bulldozed into an intermittent stream channel. Subsequently, from 1975 to 1977, a chromite milling operation was conducted onsite. Tailings were often washed downstream during periods of stream flow, and the resuspension of asbestos fibers from the tailings intomore » the air produced a significant inhalation hazard. As a result of these activities, approximately 450,000 cubic yards of mill tailings and asbestos ore remain onsite within a large tailing pile. In 1980 and 1987, State investigations indicated that the site was contributing a significant amount of asbestos into the surface water. The site will be remediated as two Operable Units (OU). The Record of Decision (ROD) addresses the remedial action for OU2, the Johns Manville Coalinga Asbestos Mill Area. The primary contaminant of concern affecting the surface water is asbestos.« less

  20. 40 CFR 35.6050 - Eligibility for pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6050 Eligibility...

  1. 40 CFR 35.6050 - Eligibility for pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6050 Eligibility...

  2. 40 CFR 35.6050 - Eligibility for pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6050 Eligibility...

  3. 40 CFR 35.6050 - Eligibility for pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Pre-Remedial Response Cooperative Agreements § 35.6050 Eligibility...

  4. Superfund Record of Decision (EPA Region 4): Aberdeen Pesticide Dumps, Moore County, Aberdeen, NC. (First remedial action), (Amendment), September 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-30

    The Aberdeen Pesticide Dumps site consists of a plant area and four disposal areas in Aberdeen, Moore County, North Carolina. The five areas are Farm Chemicals, Twin Sites, Fairway Six, McIver Dump, and Route 211. Ground water is the main source of drinking water for local residents. After investigations by EPA's Emergency Response Section in 1985 and 1986, several removal actions were conducted, including removing surface contaminants, drums, and soil in several areas. The ROD concurrently addresses surface and subsurface soil contamination. The amended remedial action for this site includes conducting a treatability study using thermal desorption; excavating and treatingmore » a total of 123,933 cubic yards of soil from all five areas including previously excavated soil from the Fairway Six and McIver Dump areas using an onsite thermal desorption process that includes an activated carbon adsorption to treat off-gases, followed by offsite incineration of residual organics.« less

  5. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...

  6. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...

  7. PERCHLORATE: Occurrence is Widespread but at Varying Levels; Federal Agencies Have Taken Some Actions to Respond to and Lessen Releases

    DTIC Science & Technology

    2010-08-01

    Massachusetts Military Reservation Army/Air Force Active Groundwater Soil 770 8,060 Remediation under way MA Fort Devens Army Active Groundwater 133...cleanup, known as a remedial action . • CERCLA itself does not establish cleanup standards. Rather, the remedial action chosen by a federal agency...perchlorate contaminated areas, which could determine the need for and feasibility of remedial action . • Edwards Air Force Base. In 1997 and 1998

  8. Science plus management equals successful remediation -- A case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buehlman, M.D.; Rogers, D.T.; Payne, F.C.

    In the past, owners of contaminated sites attempted to remediate as quickly as possible, usually by excavating contaminated soil or pumping and treating contaminated groundwater. Often, they started remediation before identifying all potential types and sources of contaminants, and before conducting a thorough hydrogeologic study. Such premature action usually resulted in the selected remedy not working, the contamination spreading, or unnecessary remedial activities. Today, successful site remediation is recognized as a complex and time-consuming undertaking--requiring a combination of careful scientific study, effective negotiation with the regulatory agencies and skillful management of multidisciplinary efforts. A case study involving a Brownfields sitemore » in southeastern Michigan clearly illustrates the elements of successful remediation. The site`s soil was contaminated with polychlorinated biphenyls (PCBs) and its groundwater with a variety of chlorinated solvents. The original estimate for remediation had exceeded $30 million. Several phases of investigation were conducted to evaluate the nature and sources of contaminants, the site`s hydrogeology, potential risks to human health and the environment, and feasible remedial technologies. Multiple cleanup criteria were established for different affected areas based on the results of the investigations, changes that were taking place with the state cleanup regulations and standards and subsequent negotiations with state and federal regulators. Innovative remedial technologies were selected. The result was a remediation that met or exceeded all soil and groundwater cleanup objectives, was performed on schedule, and was highly cost-effective. The final cost was limited to $3 million--one-tenth of the original estimate.« less

  9. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 258.57 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; and (4) Comply with standards for management of wastes as specified in § 258.58(d). (c) In...

  10. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 258.57 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; and (4) Comply with standards for management of wastes as specified in § 258.58(d). (c) In...

  11. Defensiveness versus remediation: self-theories and modes of self-esteem maintenance.

    PubMed

    Nussbaum, A David; Dweck, Carol S

    2008-05-01

    How people maintain and repair their self-esteem has been a topic of widespread interest. In this article, the authors ask, What determines whether people will use direct, remedial actions, or defensive actions? In three studies, they tested the hypothesis that a belief in fixed intelligence (entity theory) would produce defensiveness, whereas a belief in improvable intelligence (incremental theory) would foster remediation. In each study, participants assigned to the entity condition opted for defensive self-esteem repair (downward comparison in Studies 1 and 3; a tutorial on already mastered material in Study 2), but those in the incremental condition opted for self-improvement (upward comparison in Studies 1 and 3; a tutorial on unmastered material in Study 2). Experiment 3 also linked these strategies to self-esteem repair; remedial strategies were the most effective in recovering lost self-esteem for those in the incremental condition, whereas defensive strategies were most effective for those in the entity condition.

  12. Prioritization of remedial actions for radioactive waste burials in the Chernobyl exclusion zone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crossland, Ian

    2013-07-01

    Large volumes of radioactive waste were urgently buried in the Chernobyl Exclusion Zone (ChEZ) in the aftermath of the 1986 accident. Twenty-six years later, decisions must be taken about whether and how to remediate these sites. An attempt to resolve two key issues is described here: 1. How to assess the hazards posed by these facilities, recognizing that, for the foreseeable future, the Chernobyl Exclusion Zone will remain under institutional control? and 2. What standards to apply in deciding the extent of remediation? This paper presents an examination of the issues and proposes a simple decision-making process. (authors)

  13. IS REMOVAL THE ONLY OPTION: IN SITU REMEDIATION OF METAL CONTAMINATED SOILS

    EPA Science Inventory

    The In-place Inactivation and Natural Ecological Restoration Technologies (IINERT) Soil-Metals Action Team was established in 11/95 as one of several Action Teams under the USEPA Remediation Technologies Development Forum (RTDF). Its primary goal was to examine in situ remediatio...

  14. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  15. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  16. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  17. To fail is human: remediating remediation in medical education.

    PubMed

    Kalet, Adina; Chou, Calvin L; Ellaway, Rachel H

    2017-12-01

    Remediating failing medical learners has traditionally been a craft activity responding to individual learner and remediator circumstances. Although there have been moves towards more systematic approaches to remediation (at least at the institutional level), these changes have tended to focus on due process and defensibility rather than on educational principles. As remediation practice evolves, there is a growing need for common theoretical and systems-based perspectives to guide this work. This paper steps back from the practicalities of remediation practice to take a critical systems perspective on remediation in contemporary medical education. In doing so, the authors acknowledge the complex interactions between institutional, professional, and societal forces that are both facilitators of and barriers to effective remediation practices. The authors propose a model that situates remediation within the contexts of society as a whole, the medical profession, and medical education institutions. They also outline a number of recommendations to constructively align remediation principles and practices, support a continuum of remediation practices, destigmatize remediation, and develop institutional communities of practice in remediation. Medical educators must embrace a responsible and accountable systems-level approach to remediation if they are to meet their obligations to provide a safe and effective physician workforce.

  18. Site Rehabilitation Completion Report with No Further Action Proposal for the Northeast Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel, Joe; Tabor, Charles; Survochak, Scott

    2013-05-01

    The purpose of this Site Rehabilitation Completion Report is to present the post-active-remediation monitoring results for the Northeast Site and to propose No Further Action with Controls. This document includes information required by Chapter 62-780.750(4)(d), 62-780.750(6), and 62-780.600(8)(a)27 Florida Administrative Code (F.A.C.). The Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site (DOE 2009a) describes the approach for post-active-remediation monitoring. The Young - Rainey Science, Technology, and Research Center (STAR Center) is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 99-acre STAR Center is located in Largo, Florida. The Northeast Site is locatedmore » in the northeast corner of the STAR Center. The Northeast Site meets all the requirements for an RMO II closure—No Further Action with Controls. DOE is nearing completion of a restrictive covenant for the Northeast Site. DOE has completed post-active-remediation monitoring at the Northeast Site as of September 2012. No additional monitoring will be conducted.« less

  19. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. Themore » DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.« less

  20. Success of the Melton Valley Watershed Remediation at the ORNL - 12351

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adler, David; Wilkerson, Laura; Sims, Lynn

    2012-07-01

    The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Actionmore » Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)« less

  1. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown andmore » waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM).« less

  2. Superfund Record of Decision (EPA Region 5): Midco I, Gary, IN. (First remedial action), (amendment), April 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 4-acre Midco I site is an abandoned, industrial waste recycling, storage, and disposal facility in Gary, Indiana. The surrounding land use is mixed industrial, commercial, and residential. The Calumet Aquifer underlies the site and provides drinking water to wells within 1 mile of the site. The primary contaminants are VOCs, including TCE, toluene, and xylenes; metals, including chromium and lead; and inorganics. The amended remedial action for the ROD includes a reduction in the amount of soil to be treated to a minimum of 5,200 cubic yards because of the amendment to soil CALs and the determination that arsenicmore » may not be present above background levels at the site; and treating the contaminated soil onsite using with soil vapor extraction, followed by in-situ solidification/stabilization; and excavating and treating contaminated sediment from the surrounding wetlands.« less

  3. Remediation in Canadian medical residency programs: Established and emerging best practices.

    PubMed

    Shearer, Cindy; Bosma, Mark; Bergin, Fiona; Sargeant, Joan; Warren, Andrew

    2018-02-23

    Policies to guide remediation in postgraduate medical education exist in all Canadian medical schools. This study examines concordance between these policies and processes, and published "best practices" in remediation. We conducted a literature review to identify best practices in the area of remediation. We then reviewed remediation policies from all 13 English medical schools in Canada other than our own and conducted interviews with key informants from each institution. Each policy and interview transcript pair was then reviewed for evidence of pre-defined "best practices." Team members also noted additional potential policy or process enablers of successful remediation. Most policies and processes aligned with some but not all published best practices. For instance, all participating schools tailored remediation strategies to individual resident needs, and a majority encouraged faculty-student relationships during remediation. Conversely, few required the teaching of goal-setting, strategic planning, self-monitoring, and self-awareness. In addition, we identified avoidance of automatic training extension and the use of an educational review board to support the remediation process as enablers for success. Remediation policies and practices in Canada align well with published best practices in this area. Based on key informant opinions, flexibility to avoid training extension and use of an educational review board may also support optimal remediation outcomes.

  4. 40 CFR 257.27 - Selection of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... withdrawal rate of users; (iii) Ground-water quantity and quality; (iv) The potential damage to wildlife... Ground-Water Monitoring and Corrective Action § 257.27 Selection of remedy. (a) Based on the results of... ground-water protection standard as specified pursuant to §§ 257.25 (h) or (i); (3) Control the source(s...

  5. 40 CFR 257.27 - Selection of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... withdrawal rate of users; (iii) Ground-water quantity and quality; (iv) The potential damage to wildlife... Ground-Water Monitoring and Corrective Action § 257.27 Selection of remedy. (a) Based on the results of... ground-water protection standard as specified pursuant to §§ 257.25 (h) or (i); (3) Control the source(s...

  6. 40 CFR 257.27 - Selection of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... withdrawal rate of users; (iii) Ground-water quantity and quality; (iv) The potential damage to wildlife... Ground-Water Monitoring and Corrective Action § 257.27 Selection of remedy. (a) Based on the results of... ground-water protection standard as specified pursuant to §§ 257.25 (h) or (i); (3) Control the source(s...

  7. Environmental assessment on electrokinetic remediation of multimetal-contaminated site: a case study.

    PubMed

    Kim, Do-Hyung; Yoo, Jong-Chan; Hwang, Bo-Ram; Yang, Jung-Seok; Baek, Kitae

    2014-05-01

    In this study, an environmental assessment on an electrokinetic (EK) system for the remediation of a multimetal-contaminated real site was conducted using a green and sustainable remediation (GSR) tool. The entire EK process was classified into major four phases consisting of remedial investigations (RIs), remedial action construction (RAC), remedial action operation (RAO), and long-term monitoring (LTM) for environmental assessment. The environmental footprints, including greenhouse gas (GHG) emissions, total energy used, air emissions of criteria pollutants, such as NOx, SOx, and PM10, and water consumption, were calculated, and the relative contribution in each phase was analyzed in the environmental assessment. In the RAC phase, the relative contribution of the GHG emissions, total energy used, and PM10 emissions were 77.3, 67.6, and 70.4%, respectively, which were higher than those of the other phases because the material consumption and equipment used for system construction were high. In the RAO phase, the relative contributions of water consumption and NOx and SOx emissions were 94.7, 85.2, and 91.0%, respectively, which were higher than those of the other phases, because the water and electricity consumption required for system operation was high. In the RIs and LTM phases, the environmental footprints were negligible because the material and energy consumption was less. In conclusion, the consumable materials and electrical energy consumption might be very important for GSR in the EK remediation process, because the production of consumable materials and electrical energy consumption highly affects the GHG emissions, total energy used, and air emissions such as NOx and SOx.

  8. Explanation of non-additive effects in mixtures of similar mode of action chemicals.

    PubMed

    Kamo, Masashi; Yokomizo, Hiroyuki

    2015-09-01

    Many models have been developed to predict the combined effect of drugs and chemicals. Most models are classified into two additive models: independent action (IA) and concentration addition (CA). It is generally considered if the modes of action of chemicals are similar then the combined effect obeys CA; however, many empirical studies report nonlinear effects deviating from the predictions by CA. Such deviations are termed synergism and antagonism. Synergism, which leads to a stronger toxicity, requires more careful management, and hence it is important to understand how and which combinations of chemicals lead to synergism. In this paper, three types of chemical reactions are mathematically modeled and the cause of the nonlinear effects among chemicals with similar modes of action was investigated. Our results show that combined effects obey CA only when the modes of action are exactly the same. Contrary to existing knowledge, combined effects are generally nonlinear even if the modes of action of the chemicals are similar. Our results further show that the nonlinear effects vanish out when the chemical concentrations are low, suggesting that the current management procedure of assuming CA is rarely inappropriate because environmental concentrations of chemicals are generally low. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  9. Environmental impacts of remediation of a trichloroethene-contaminated site: life cycle assessment of remediation alternatives.

    PubMed

    Lemming, Gitte; Hauschild, Michael Z; Chambon, Julie; Binning, Philip J; Bulle, Cécile; Margni, Manuele; Bjerg, Poul L

    2010-12-01

    The environmental impacts of remediation of a chloroethene-contaminated site were evaluated using life cycle assessment (LCA). The compared remediation options are (i) in situ bioremediation by enhanced reductive dechlorination (ERD), (ii) in situ thermal desorption (ISTD), and (iii) excavation of the contaminated soil followed by off-site treatment and disposal. The results showed that choosing the ERD option will reduce the life-cycle impacts of remediation remarkably compared to choosing either ISTD or excavation, which are more energy-demanding. In addition to the secondary impacts of remediation, this study includes assessment of local toxic impacts (the primary impact) related to the on-site contaminant leaching to groundwater and subsequent human exposure via drinking water. The primary human toxic impacts were high for ERD due to the formation and leaching of chlorinated degradation products, especially vinyl chloride during remediation. However, the secondary human toxic impacts of ISTD and excavation are likely to be even higher, particularly due to upstream impacts from steel production. The newly launched model, USEtox, was applied for characterization of primary and secondary toxic impacts and combined with a site-dependent fate model of the leaching of chlorinated ethenes from the fractured clay till site.

  10. Biological technologies for the remediation of co-contaminated soil.

    PubMed

    Ye, Shujing; Zeng, Guangming; Wu, Haipeng; Zhang, Chang; Dai, Juan; Liang, Jie; Yu, Jiangfang; Ren, Xiaoya; Yi, Huan; Cheng, Min; Zhang, Chen

    2017-12-01

    Compound contamination in soil, caused by unreasonable waste disposal, has attracted increasing attention on a global scale, particularly since multiple heavy metals and/or organic pollutants are entering natural ecosystem through human activities, causing an enormous threat. The remediation of co-contaminated soil is more complicated and difficult than that of single contamination, due to the disparate remediation pathways utilized for different types of pollutants. Several modern remediation technologies have been developed for the treatment of co-contaminated soil. Biological remediation technologies, as the eco-friendly methods, have received widespread concern due to soil improvement besides remediation. This review summarizes the application of biological technologies, which contains microbial technologies (function microbial remediation and composting or compost addition), biochar, phytoremediation technologies, genetic engineering technologies and biochemical technologies, for the remediation of co-contaminated soil with heavy metals and organic pollutants. Mechanisms of these technologies and their remediation efficiencies are also reviewed. Based on this study, this review also identifies the future research required in this field.

  11. 18 CFR 281.214 - Notice, complaint and remedy.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Notice, complaint and remedy. 281.214 Section 281.214 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... determines that a violation of this subpart has occurred, it shall take whatever action it deems appropriate...

  12. Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lerch, J.A.; Hulstrom, L.C.; Sands, J.P.

    2013-07-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previouslymore » investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation

  13. Treatability Study in Support of Intrinsic Remediation for Site ST41. Elmendorf Air Force Base, Anchorage, Alaska

    DTIC Science & Technology

    1995-10-01

    BTEX on the shallow groundwater system at the site. Site history and the results of soil and groundwater investigations conducted previously are also...or predicted future, concentrations and distribution. Whether in conjunction with the interim 1 remedial action system already in place or not...L:\\45007\\st4 I rept\\st41 finl.doc D 0 • 0 • 0 0 0 0 • 6 FINAL 4 22 years, depending upon the effectiveness of the interim remedial action (IRA) system

  14. 7 CFR 15a.3 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... 15a.3 Section 15a.3 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Introduction § 15a.3 Remedial and... discriminated against persons on the basis of sex in an education program or activity, such recipient shall take...

  15. Possible Applications of Soil Remediation Technologies in Latvia

    NASA Astrophysics Data System (ADS)

    Burlakovs, Juris; Vircavs, Magnuss

    2011-01-01

    Increasing public concern about deleterious effects of contamination on the environment and human health has led to legislative actions aimed at controlling and regulating the emission of potential contaminants into the environment, but there is still a plethora of territories historically contaminated with different contaminants within the territory of Latvia. The purpose of the present study is to give an overview of the formerly and presently contaminated areas and give some recommendations for remediation. 242 first category contaminated territories (the contamination exceeds the acceptable normative 10 times or more) are mentioned in the National Register of Contaminated Territories, a lot of them are known as contaminated with hazardous contaminants such as heavy metals, oil products, organic compounds and other contaminants in different amounts and concentrations. An overview of soil contamination in Latvia is provided, the planned and recommended research, as well as the planned remediation in pilot case studies, are described, giving a review of the historical contamination situation and of applications of the planned remediation technologies.

  16. 40 CFR 300.430 - Remedial investigation/feasibility study and selection of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., to provide additional data for the detailed analysis and to support engineering design of remedial... threat to human health or the environment or to support the analysis and design of potential response... timely manner and no later than the early stages of the comparative analysis. The lead and support...

  17. 40 CFR 300.430 - Remedial investigation/feasibility study and selection of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., to provide additional data for the detailed analysis and to support engineering design of remedial... threat to human health or the environment or to support the analysis and design of potential response... timely manner and no later than the early stages of the comparative analysis. The lead and support...

  18. 40 CFR 300.430 - Remedial investigation/feasibility study and selection of remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., to provide additional data for the detailed analysis and to support engineering design of remedial... threat to human health or the environment or to support the analysis and design of potential response... timely manner and no later than the early stages of the comparative analysis. The lead and support...

  19. 40 CFR 300.430 - Remedial investigation/feasibility study and selection of remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., to provide additional data for the detailed analysis and to support engineering design of remedial... threat to human health or the environment or to support the analysis and design of potential response... timely manner and no later than the early stages of the comparative analysis. The lead and support...

  20. 40 CFR 300.430 - Remedial investigation/feasibility study and selection of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., to provide additional data for the detailed analysis and to support engineering design of remedial... threat to human health or the environment or to support the analysis and design of potential response... timely manner and no later than the early stages of the comparative analysis. The lead and support...