Science.gov

Sample records for administration bpa project

  1. Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects for 1990/1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation.

  2. BPA Statutes.

    SciTech Connect

    United States. Bonneville Power Administration.

    1999-08-01

    This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

  3. Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects, 1989/1990.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 6-7, 1990, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. The following pages list the projects by title, the project leaders and BPA's project officers, and an abstract of each leaders presentation. These summaries are in some cases preliminary; they are subject to change and should not be quoted without consulting the project leader.

  4. BPA Facts

    SciTech Connect

    2014-03-01

    The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comes from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability

  5. Extensive metabolism and route-dependent pharmacokinetics of bisphenol A (BPA) in neonatal mice following oral or subcutaneous administration.

    PubMed

    Draganov, Dragomir I; Markham, Dan A; Beyer, Dieter; Waechter, John M; Dimond, Stephen S; Budinsky, Robert A; Shiotsuka, Ronald N; Snyder, Stephanie A; Ehman, Kimberly D; Hentges, Steven G

    2015-07-01

    Orally administered bisphenol A (BPA) undergoes efficient first-pass metabolism to produce the inactive conjugates BPA-glucuronide (BPA-G) and BPA-sulfate (BPA-S). This study was conducted to evaluate the pharmacokinetics of BPA, BPA-G and BPA-S in neonatal mice following the administration of a single oral or subcutaneous (SC) dose. This study consisted of 3 phases: (1) mass-balance phase in which effective dose delivery procedures for oral or SC administration of (3)H-BPA to postnatal day three (PND3) mice were developed; (2) pharmacokinetic phase during which systemic exposure to total (3)H-BPA-derived radioactivity in female PND3 mice was established; and (3) metabolite profiling phase in which 50 female PND3 pups received either a single oral or SC dose of (3)H-BPA. Blood was collected from 5 pups/route/time-point at various times post-dosing, the blood plasma samples were pooled by group, and time-point and samples were profiled by HPLC with fraction collection. Fractions were analyzed for total radioactivity and data used to reconstruct radiochromatograms and to integrate individual peaks. The identity of the BPA, BPA-G, and BPA-S peaks was confirmed using authentic standards and LC-MS/MS analysis. The result of this study revealed that female PND3 mice have the capacity to metabolize BPA to BPA-G, BPA-S and other metabolites after both routes of administration. Systemic exposure to free BPA is route-dependent as the plasma concentrations were lower following oral administration compared to SC injection. PMID:25929835

  6. BPA Statutes.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-01-01

    This publication includes the Bonneville Power Administration`s (BPA) authorities. It combines the two previous booklets of BPA authorities` and adds: sections of certain Appropriation Acts affecting BPA; a list of all other Appropriation Acts affecting BPA; a list of the acts authorizing Federal hydroelectric dams in the Columbia River Basin; portions of the Energy Policy Act of 1992 that specifically apply to BPA; portions of the Federal Power Act to provide context for the Energy Policy Act. The laws are in their United States Code format, rather than in the Public Law format as passed. Thus, the citation for Bonneville Project Act section 2(f) is shown as 16 USC {section}832a(f). Most people are familiar with the Public Law citations, so they have been retained and appear in italics at the end of each paragraph. In addition, later amendments to earlier laws are reflected in the United States Code language. For example, the Preference Act`s definition of ``Pacific Northwest`` (16 USC {section}837(b)) reflects the Northwest Power Act`s amendment of that term. The laws are presented in the numerical order they appear in the United States Code, rather than in the order in which they became law. Therefore, the Energy Policy Act of 1992 is presented first. This booklet is not, nor is it intended to be, an official reporter. All citations should be made to the United States Code or some other officially recognized reporter.

  7. BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

  8. BPA Instream Habitat Projects Completed within Asotin Creek Watershed, 1999-2001 Final Report.

    SciTech Connect

    Johnson, Bradley J.

    2002-10-23

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in WRIA 35. According to WDFW's Priority WRIA's by At-Risk Stock Significance Map, it is the highest priority WRIA in southeastern WA. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve, because no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps Members have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, southeastern Washington had been dealing with endangered fall and spring chinook salmon since 1994. The Asotin Creek In-Stream Habitat Project teamed BPA and Governor's Salmon Recovery Funding on four instream habitat projects in the Asotin Creek Watershed. These projects provide complex instream habitat for steelhead, bull trout and spring chinook in the stream. 38 pools were

  9. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  10. Multifunctional data acquisition and analysis and optical sensors: a Bonneville Power Administration (BPA) update

    NASA Astrophysics Data System (ADS)

    Erickson, Dennis C.; Donnelly, Matt K.

    1995-04-01

    The authors present a design concept describing a multifunctional data acquisition and analysis architecture for advanced power system monitoring. The system is tailored to take advantage of the salient features of low energy sensors, particularly optical types. The discussion of the system concept and optical sensors is based on research at BPA and PNL and on progress made at existing BPA installations and other sites in the western power system.

  11. Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.

    SciTech Connect

    United States. Bonneville Power Administration.

    1985-04-01

    The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

  12. Project REACH Administrator's Manual. PRAM.

    ERIC Educational Resources Information Center

    Piuma, Chesca; And Others

    The final volume in a series on Project REACH (Regular Education for All Children with Handicaps) is addressed to administrators involved in integrating severely disabled students into regular public schools. The manual is intended as a trouble-shooting tool with information on background theories and specific strategies. An introductory chapter…

  13. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ...: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: BPA intends to... reinforcements of five existing BPA substations, placement of new conductor on sections of an existing...

  14. BPA Riparian Fencing and Alternative Water Development Projects Completed within Asotin Creek Watershed, 2000 and 2001 Asotin Creek Fencing Final Report of Accomplishments.

    SciTech Connect

    Johnson, B.J.

    2002-01-01

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for endangered salmonids since 1994. The ''Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00'' teamed BPA and the Governor's Salmon Recovery Funding to plant approximately 84

  15. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  16. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  17. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  18. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  19. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  20. BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.

    SciTech Connect

    Morgan, David

    2004-02-01

    The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and cooler (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and [making it] more beneficial to anadromous [fish]'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with

  1. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with §...

  2. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by...

  3. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by...

  4. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with §...

  5. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by...

  6. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with §...

  7. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with §...

  8. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by...

  9. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with §...

  10. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by...

  11. 75 FR 39241 - Hooper Springs Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Bonneville Power Administration Hooper Springs Project AGENCY: Bonneville Power Administration (BPA... Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would be... 115-kV Lane Creek Substation, east of the City of Wayan, Idaho. The proposed project would...

  12. Boron biodistribution for BNCT in the hamster cheek pouch oral cancer model: Combined administration of BSH and BPA

    SciTech Connect

    D.W. Nigg; William Bauer; Various Others

    2014-06-01

    Sodium mercaptoundecahydro-closo-dodecaborate (BSH) is being investigated clinically for BNCT. We examined the biodistribution of BSH and BPA administered jointly in different proportions in the hamster cheek pouch oral cancer model. The 3 assayed protocols were non-toxic, and showed preferential tumor boron uptake versus precancerous and normal tissue and therapeutic tumor boron concentration values (70–85 ppm). All 3 protocols warrant assessment in BNCT studies to contribute to the knowledge of (BSH+BPA)-BNCT radiobiology for head and neck cancer and optimize therapeutic efficacy.

  13. Short Mountain Landfill gas recovery project

    SciTech Connect

    Not Available

    1992-05-01

    The Bonneville Power Administration (BPA), a Federal power marketing agency, has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. BPA's latest load/resource balance forecast, projects the capability of existing resources to satisfy projected Federal system loads. The forecast indicates a potential resource deficit. The underlying need for action is to satisfy BPA customers' demand for electrical power.

  14. Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.

    SciTech Connect

    US Bonneville Power Administration

    1993-11-01

    This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

  15. Early utility experience with wind power generation. Volume 3: Bonneville Power Administration Goodnoe Hills Project. Final report

    SciTech Connect

    McCabe, T.; Henry, G.; Tennis, M.; Goldenblatt, M.

    1984-01-01

    This report is one of three presenting the results of EPRI Research Project 1590-1, Evaluation of Electric Utility Experience with Wind Power Generation. The objective of this project was to develop an improved understanding of wind power generation, in particular the process a utility must undergo to initiate and carry out a wind turbine project. The primary tasks of RP1590-1 were to document and evaluate the experience of two utilities with megawatt-scale wind turbine installations from project inception to the wind turbine's first rotation. This technical report presents the experiences of the Bonneville Power Administration (BPA) as the participating utility in the MOD-2 cluster field test program. Under this program the National Aeronautics and Space Administration (NASA) as management agent for the US Department of Energy, has installed three MOD-2 wind turbines at Bonneville's Goodnoe Hills site. All documents and reports pertaining to BPA's experience with wind energy at Goodnoe Hills were reviewed and excerpts made of the highlights. Gaps in the documentation were filled by talking with the appropriate people. Site visits were conducted to monitor current activity. The information obtained was evaluated for its generic relevance and benefit to other utilities. The chronology of the steps taken in implementing the wind turbine project and some of the lessons learned are included in the report. In each section, important activities, critical assumptions, and interesting insights which might benefit other utility wind programs are identified.

  16. Short Mountain Landfill Gas Recovery Project : Stage 1 Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Bonneville Power Administration (BPA), a Federal power marketing agency, has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. BPA`s latest load/resource balance forecast, projects the capability of existing resources to satisfy projected Federal system loads. The forecast indicates a potential resource deficit. The underlying need for action is to satisfy BPA customers` demand for electrical power.

  17. 13 CFR 305.5 - Project administration by District Organization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project administration by District Organization. 305.5 Section 305.5 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... § 305.5 Project administration by District Organization. (a) When a District Organization is not...

  18. 13 CFR 302.12 - Project administration, operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL TERMS AND CONDITIONS FOR INVESTMENT ASSISTANCE § 302.12 Project... in its sole discretion, the Project for which such Investment Assistance is awarded will be properly... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project administration,...

  19. Non-Federal Participation Capacity Ownership : Administrator`s Final Record of Decision.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-03-01

    In a September 1988 Record of Decision (ROD), Bonneville Power Administration (BPA) explained its decision to proceed with the Third Alternating Current (Third AC) Intertie addition construction project using its own funding. At that time, BPA`s decision on non-Federal ownership access to the added capacity was deferred to a separate non-Federal participation policy development process. BPA`s preferred alternative for providing non-Federal Intertie access is to adopt Capacity Ownership for 725 MW. Capacity Ownership allows non-Federal PNW scheduling utilities to purchase contract rights to use protions of BPA`s share of AC Intertie capacity for the life of the Intertie facilities. This ROD documents BPA`s decision to proceed with Capacity Ownership for non-Federal parties.

  20. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  1. Bonneville Power Administration 1991 site environmental report

    SciTech Connect

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  2. 77 FR 35366 - Albany-Eugene Transmission Line Rebuild Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD..., based on the Albany-Eugene Transmission Line Rebuild Project (DOE/EIS-0457, March 2012). BPA has decided... will continue to operate at 115 kV. ADDRESSES: Copies of the ROD and EIS may be obtained by calling...

  3. Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

    SciTech Connect

    United States. Bonneville Power Administration

    2006-10-25

    The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

  4. Person-Centered Management in Project Administration.

    ERIC Educational Resources Information Center

    Caraway, James E.

    The theories of several contemporary management theorists are examined in order to demonstrate that their administrative stance is that of a person-intensive approach to management. After exploring leadership theory and the positions of Douglas McGregor, John J. Morse, Jay W. Lorsch, Rensis Likert, Bernard M. Bass, William Reddin, George H. Rice,…

  5. Project Administration Techniques for Successful Classroom Collaborative Writing.

    ERIC Educational Resources Information Center

    Kryder, LeeAnne Giannone

    1991-01-01

    Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)

  6. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  7. Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

  8. Proposed Revenues, Financial Strategy, and Program Costs for FY 1992 and 1993 : Technical Appendix, BPA Programs in Perspective.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-07-01

    Programs in Perspective is the Bonneville Power Administration's public involvement process (PIP) for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA effort. This planning leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad issues than is possible under the strict administrative procedures of ratemaking. The self-financed character of BPA has made this public process a necessary and valuable one to assure that those who pay BPA's rates have a clear understanding and a strong voice in the plans for use of the resulting revenues. During 1989, the previous PIP engaged the region in discussion of major strategic, issues focussing on major areas. In 1990, BPA seeks discussion of the directions and plans specifically for fiscal years 1992 and 1993. The steps taken for those years will lay the foundation for the years beyond. Thus, we have subtitled this year's process, Staying fit for the long run.'' We have consulted extensively with customers and others in the region in developing these plans. In dozens of program--specific meetings, BPA staff have talked and listened to what others think our plans ought to be. PIP now gives us a chance to review their sum total, along with projections for revenues and our overall financial position. 8 tabs., 8 figs.

  9. Annual Review of BPA-Funded Anadromous Fish Projects, March 18-20, 1986, Holiday Inn Airport, Portland, Oregon.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-02-01

    This report contains descriptions of projects specifically related to anadromous salmonids. They include projects in the following categories: (1) fish and wildlife projects in western Montana; (2) fish health and physiology; (3) habitat enhancement and passage improvement - Oregon I; (4) passage improvement and natural propagation - Washington; (5) habitat enhancement and passage improvements - Oregon II; (6) future hydroelectric assessments; (7) habitat enhancement and passage improvement - Idaho; (8) downstream migration: flows and monitoring; (9) downstream migration: reservoir impacts; and (10) habitat evaluation and monitoring. (ACR)

  10. 76 FR 59394 - Big Eddy-Knight Transmission Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Bonneville Power Administration Big Eddy-Knight Transmission Project AGENCY: Bonneville Power Administration...: This notice announces the availability of the ROD to implement the Big Eddy-Knight Transmission Project... Transmission Project will accommodate long-term firm transmission requests that BPA has received by...

  11. 78 FR 18481 - Project-Level Predecisional Administrative Review Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... Forest Service 36 CFR Part 218 RIN 0596-AD07 Project-Level Predecisional Administrative Review Process... (the Department) is issuing this final rule to establish the ] sole process by which the public may... process. Section 428 further directs the Secretary to apply these procedures in lieu of the...

  12. Bonneville Power Administration 1991 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  13. Environmental Effects of BPA

    PubMed Central

    Canesi, Laura

    2015-01-01

    Research on bisphenol A (BPA) as an environmental contaminant has now major regulatory implications toward the ecosystem health, and hence it is incumbent on scientists to do their research to the highest standards possible, in order that the most appropriate decisions are made to mitigate the impacts to aquatic wildlife. However, the contribution given so far appears rather fragmented. The present overview aims to collect available information on the effects of BPA on aquatic vertebrates and invertebrates to provide a general scenario and to suggest future developments toward more comprehensive approaches useful for aquatic species protection. PMID:26674307

  14. BPA Facts Pocket Edition

    SciTech Connect

    2014-04-01

    BPA will be an engine of the Northwest’s economic prosperity and environmental sustainability. BPA’s actions advance a Northwest power system that is a national leader in providing: • high reliability; • low rates consistent with sound business principles; • responsible environmental stewardship; and • accountability to the region. We deliver on these public responsibilities through a commercially successful business.

  15. Bonneville Power Administration 1998 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  16. Sustainability at BPA 2013

    SciTech Connect

    2013-12-01

    THIS IS THE THIRD YEAR BPA has reported on sustainability program accomplishments. The report provides an opportunity to review progress made on sustainability initiatives, evaluate how far we have come and how much we can improve. The program has demonstrated maturation as the concepts of sustainability and resource conservation are communicated and understood. The sustainability program started as an employee-driven “grass roots” effort in 2010. Sustainability is becoming a consideration in how work is performed. The establishment of several policies supporting sustainability efforts proves the positive progress being made. In 2009, BPA became a founder and member of The Climate Registry, a nonprofit collaboration that sets standards to calculate, verify and report greenhouse gas emissions. This year, BPA completed and published our Greenhouse Gas inventory for the years of 2009, 2010 and 2011. The 2012 inventory is currently in the process of third-party verification and scheduled for public release in January 2014. These inventories provide a concrete measure of the progress we are making.

  17. Prediction and evaluation of route dependent dosimetry of BPA in rats at different life stages using a physiologically based pharmacokinetic model

    SciTech Connect

    Yang, Xiaoxia Doerge, Daniel R.; Fisher, Jeffrey W.

    2013-07-01

    Bisphenol A (BPA) has received considerable attention throughout the last decade due to its widespread use in consumer products. For the first time a physiologically based pharmacokinetic (PBPK) model was developed in neonatal and adult rats to quantitatively evaluate age-dependent pharmacokinetics of BPA and its phase II metabolites. The PBPK model was calibrated in adult rats using studies on BPA metabolism and excretion in the liver and gastrointestinal tract, and pharmacokinetic data with BPA in adult rats. For immature rats the hepatic and gastrointestinal metabolism of BPA was inferred from studies on the maturation of phase II enzymes coupled with serum time course data in pups. The calibrated model predicted the measured serum concentrations of BPA and BPA conjugates after administration of 100 μg/kg of d6-BPA in adult rats (oral gavage and intravenous administration) and postnatal days 3, 10, and 21 pups (oral gavage). The observed age-dependent BPA serum concentrations were partially attributed to the immature metabolic capacity of pups. A comparison of the dosimetry of BPA across immature rats and monkeys suggests that dose adjustments would be necessary to extrapolate toxicity studies from neonatal rats to infant humans. - Highlights: • A PBPK model predicts the kinetics of bisphenol A (BPA) in young and adult rats. • BPA metabolism within enterocytes is required for fitting of oral BPA kinetic data. • BPA dosimetry in young rats is different than adult rats and young monkeys.

  18. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY... proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat County, Washington. To interconnect the Wind Project, BPA will expand an existing substation (Rock Creek Substation) by...

  19. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project... their proposed Lower Snake River Wind Energy Project (Wind Project) in Garfield and Columbia counties, Washington. To interconnect the Wind Project, BPA will construct a new substation (Central Ferry...

  20. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  1. Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project

    SciTech Connect

    N /A

    2004-10-21

    The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

  2. Charting a Course for the Future : BPA Programs in Perspectives, Technical Appendix.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Programs in Perspective is the Bonneville Power Administration`s public involvement process for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA. This process leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad issues than is possible under the strict administrative procedures of ratemaking. The self-financed character of BPA has made this public process a necessary and valuable one to assure that those who play BPA`s rates have a clear understanding and a strong voice in the plans for use of the resulting revenues.

  3. Conforth Ranch (Wanaket) Wildlife Mitigation Project : Draft Management Plan and Draft Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Confederated Tribes of the Umatilla Reservation, Oregon.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  4. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  5. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  6. 9. Photocopy of Reinforced Concrete Details drawing (from the BPA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of Reinforced Concrete Details drawing (from the BPA Engineering Vault, Drawing C13-J2-342-D1, Sheet 6, 13 March 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  7. 7. Photocopy of Elevations drawing (from the BPA Engineering Vault, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of Elevations drawing (from the BPA Engineering Vault, Drawing C13-J2-342-D1, Sheet 3, 13 March 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  8. BPA's Eighth Annual Energy Conservation Management Conference : Proceedings.

    SciTech Connect

    Energy Conservation Management Conference; United States. Bonneville Power Administration.

    1981-01-01

    The five-year energy conservation program at Bonneville Power Administration (BPA) is described at the conference. An overview of the program is presented. Topics covered in panel discussions include: how utilities can work effectively with weatherization contractors, homebuilders, energy auditors, and weatherization material suppliers; mechanisms for implementing conservation programs in the commercial sector; experiences gained in existing residential weatherization programs; and streamlining relationships between consumers, utilities, and BPA in providing services and getting feedback. The planning, programming, technical assistance, and engineering thrusts of BPA's conservation programs are discussed. Indoor air quality, renewable energy, and the regulator's role in relationships to energy conservation are discussed. Passive solar programs, DOE initiatives in solar and conservation for buildings, conservation potential in the commercial and industrial sectors, and current conservation research and development are also discussed. (MCW)

  9. Project Administration by Indian Federal R & D Agencies.

    ERIC Educational Resources Information Center

    Mouly, V. Suchitra; Sankaran, Jayaram K.

    1999-01-01

    A survey of scientists and engineers in research and educational institutions in India investigated the strengths and weaknesses of the existing system of administering research and development (R&D) projects. Topics addressed include proposal submission, peer review, project reporting, budgeting, interagency interaction, and project evaluation.…

  10. Administrative Leadership as Projection, Social Control, and Action.

    ERIC Educational Resources Information Center

    Reed, Donald B.

    Over the past 50 years, theoretical and methodological problems have plagued the study of leadership. This paper, proposing an alternative theory, argues that leadership has three fundamental components: projection and social control, which are linked by action. Projection is the visualization of a project to be completed. Educational…

  11. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  12. Collaborations for Literacy. An Intergenerational Reading Project. Administrator's Handbook.

    ERIC Educational Resources Information Center

    Nickse, Ruth S.; Englander, Nancy

    "Collaborations for Literacy" is a project conducted at Boston University (Massachusetts) that uses college work-study students to teach adults to read through reading to and with a child. This instruction is provided at two Boston neighborhood sites (Jackson-Mann Community School and the Brighton branch of the Boston Public Library). The project…

  13. 77 FR 47337 - Project-Level Predecisional Administrative Review Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... submitted specific written comments regarding the proposed project or activity unless the issue is based on... Chief of the Forest Service (Chief), to provide for a predecisional objection process based on Section... part 218 on January 9, 2004 (69 FR 1529), followed by a final rule on September 17, 2008 (73 FR...

  14. SCHOOL BUILDING PROJECTS, A GUIDE TO ADMINISTRATIVE PROCEDURES.

    ERIC Educational Resources Information Center

    MORRIS, LYLE L.

    THIS GUIDE PROVIDES STEP BY STEP ASSISTANCE TO THOSE RESPONSIBLE FOR A SCHOOL BUILDING PROJECT. THE RESPONSIBILITIES OF THE BOARD OF EDUCATION AND THE SCHOOL STAFF ARE EDUCATIONAL PLANNING AND MAKING STUDIES OF THE SCHOOL POPULATION. ADVISORY SERVICES ARE PROVIDED BY THE STATE EDUCATION DEPARTMENT. THE FOLLOWING STEPS ARE AMONG THOSE CITED AS…

  15. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    SciTech Connect

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  16. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  17. Assessment of the Geothermal Potential Within the BPA Marketing Area.

    SciTech Connect

    Lund, John W.; Allen, Eliot D.

    1980-07-01

    The potential of geothermal energy is estimated that can be used for direct heat applications and electrical power generation within the Bonneville Power Administration (BPA) marketing area. The BPA marketing area includes three principal states of Oregon, Washington, and Idaho and portions of California, Montana, Wyoming, Nevada, and Utah bordering on these three states. This area covers approximately 384,000 square miles and has an estimated population of 6,760,000. The total electrical geothermal potential within this marketing area is 4077 MW/sub e/ from hydrothermal resources and 16,000 MW/sub e/ from igneous systems, whereas the total thermal (wellhead) potential is 16.15 x 10/sup 15/ Btu/y. Approximately 200 geothermal resource sites were initially identified within the BPA marketing area. This number was then reduced to about 100 sites thought to be the most promising for development by the year 2000. These 100 sites, due to load area overlap, were grouped into 53 composite sites; 21-3/4 within BPA preference customer areas and 31-1/4 within nonpreference customer areas. The geothermal resource potential was then estimated for high-temperature (> 302/sup 0/F = 150/sup 0/C), intermediate-temperature (194 to 302/sup 0/F = 90 to 150/sup 0/C), and low-temperature (< 194/sup 0/F = 90/sup 0/C) resources.

  18. Project TEAMS (Techniques and Education for Achieving Management Skills): Health Care Administrators.

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    These Project TEAMS (Techniques and Education for Achieving Management Skills) instructional materials consist of five units for use in training health care administrators. Unit 1 contains materials designed to help the health care administrators increase their management skills in regard to self-awareness, time management, problem solving,…

  19. Hot Springs-Garrison Fiber Optic Project

    SciTech Connect

    Not Available

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

  20. Project Plan for Taft-Bell 500 KV Transmission Line on Federal Lands Administrated by United States Department of Interior, Bureau of Land Management and United States Department of Agriculture Forest Service, Construction by Bonneville Power Administration.

    SciTech Connect

    Gillard, C.E.; Miller, C.S.

    1985-08-01

    The project described includes the Taft-Bell 500 kV Transmission Line. This facility crosses 52.05 miles of National Forest System lands, and 2.54 miles of lands managed by the Bureau of Land Management. Between the Coeur d'Alene River and Wallace, a 10.5 mile portion will parallel the Washington Water Power Company's Noxon-Wallace-Pine Creek 230 kV Transmission Line. BPA will do road construction and right-of-way clearing for both The Washington Water Power Company and BPA transmission lines in this parallel area. This Project Plan is a compilation of Points of Agreement. It is intended to serve as permanent documentation and as a field guide during the construction period.

  1. The Administration of Sponsored Programs. Handbook for Developing and Managing Research Activities and Other Projects.

    ERIC Educational Resources Information Center

    Beasley, Kenneth L.; And Others

    Designed as a standard reference and training resource for administrators and project managers, this handbook discusses how to plan, organize, and manage sponsored projects in any organizational setting. It provides detailed, how-to-do-it information and many resources for: negotiating grants, awards, and contracts; organizing a sponsored projects…

  2. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Transition WORKS

    ERIC Educational Resources Information Center

    Fraker, Thomas; Black, Alison; Mamun, Arif; Manno, Michelle; Martinez, John; O'Day, Bonnie; O'Toole, Meghan; Rangarajan, Anu; Reed, Debbie

    2011-01-01

    The Social Security Administration is funding a random assignment evaluation of six demonstration projects to improve employment and other outcomes for youth ages 14 to 25 who are either receiving disability benefits or are at high risk of receiving them in the future. This report reviews the Youth Transition Demonstration (YTD) projects, located…

  3. CASEI Project (Consultation and Administration Specialists in Early Intervention) Final Report.

    ERIC Educational Resources Information Center

    Ostrosky, Michaelene M.

    This final report describes the activities and accomplishments of the Consultation and Administration Specialists in Early Intervention Project (CASEI). This federally funded project was developed to provide cross-disciplinary preservice training for early intervention (EI) specialists in Illinois. Students were recruited from a broad range of…

  4. National Oceanic and Atmospheric Administration's Honolulu Laboratory Renewal Project, Honolulu, Hawaii

    SciTech Connect

    Not Available

    2002-08-01

    This brochure provides an overview of The National Oceanic and Atmospheric Administration's Honolulu Laboratory Renewal Project, a project designed to adhere to the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) rating system. Diagrams of the HVAC system and the rainwater collection system are included.

  5. Molecular Mechanisms of Action of BPA

    PubMed Central

    Acconcia, Filippo; Pallottini, Valentina

    2015-01-01

    Bisphenol A (BPA) exposure has been associated with serious endocrine-disrupting effects in humans and wildlife. Toxicological and epidemiological studies evidenced that BPA increases body mass index and disrupts normal cardiovascular physiology by interfering with endogenous hormones in rodents, nonhuman primates, and cell culture test systems. The BPA concentration derived from these experiments were used by government regulatory agencies to determine the safe exposure levels of BPA in humans. However, accumulating literature in vivo and in vitro indicate that at concentrations lower than that reported in toxicological studies, BPA could elicit a different endocrine-disrupting capacity. To further complicate this picture, BPA effects rely on several and diverse mechanisms that converge upon endocrine and reproductive systems. If all or just few of these mechanisms concur to the endocrine-disrupting potential of low doses of BPA is at present still unclear. Thus, taking into account that the incidence and/or prevalence of health problems associated with endocrine disruption have increased worldwide, the goal of the present review is to give an overview of the many mechanisms of BPA action in order to decipher whether different mechanisms are at the root of the effect of low dose of BPA on endocrine system. PMID:26740804

  6. Optimizing Project Administrative Workflow with Formstack, Sharepoint, and Vanderbilt CORES Software

    PubMed Central

    Vinson, Paige; Wright, Lisa

    2013-01-01

    Tracking administrative workflow for Core projects is a difficult task. Cores are increasingly required to provide metrics demonstrating productivity, scope of projects, and success rates, yet scientific staff members do not have sufficient access or bandwidth to produce this type of broad spectrum data easily. In an effort to reduce redundancy, automate recurrent tasks and minimize staff labor, the Vanderbilt High Throughput Screening (HTS) Facility has combined readily available web-based software with institutional CORE software. The HTS Facility is striving toward a goal of having common sets of metrics available, as needed, to communicate the institutional impact of the Core to senior leadership and funding agencies. These administrative workflow improvements also increase effective and efficient communication in daily project administration and minimized required labor from scientific staff.

  7. Challenges of the Administrative Consultation Wiki Research Project as a Learning and Competences Development Method for MPA Students

    ERIC Educational Resources Information Center

    Kovac, Polonca; Stare, Janez

    2015-01-01

    Administrative Consultation Wiki (ACW) is a project run under the auspices of the Faculty of Administration and the Ministry of Public Administration in Slovenia since 2009. A crucial component thereof is the involvement of students of Master of Public Administration (MPA) degree programs to offer them an opportunity to develop competences in…

  8. The Social Security Administration's Youth Transition Demonstration Projects: Implementation Lessons from the Original Projects

    ERIC Educational Resources Information Center

    Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David

    2010-01-01

    This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…

  9. Health Care Administrators. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    The result of a project to develop short courses to help health care administrators and supervisors in developing practical, up-to-date management skills, this instructional workbook provides information and exercises applicable to on-the-job situations. Unit I covers the following leadership considerations: self-awareness, time management,…

  10. Enhancing Administrators' Capacity for Leadership by Improving Evaluation Practices and Processes Project

    ERIC Educational Resources Information Center

    Mathes, Staci M.

    2009-01-01

    This problem-based learning project focused on the need to enhance the capacity for leadership of building administrators in order to effectively evaluate teachers. Federal and state guidelines mandate highly qualified teachers in every classroom, and teacher evaluation is an important component to ensure qualified teachers are in the classroom.…

  11. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  12. [Physical projects atelier: strategy for physical resources administration learning on nursing].

    PubMed

    Draganov, Patricia Bover; Sanna, Maria Cristina

    2011-09-01

    The success of learning involves adequate strategies. Those inspired on andragogy, which is the science of teaching adults, seem to be ideal for the nursing undergraduate subject "projects", with a focus on the administration of physical resources for nursing. This study reports teaching strategies that try to estimulate the acquisition of competences that make the nurse capable of a dialogue on projects with a multiprofessional team. The strategy involved a workshop composed by four stages: reading of projects, health assistance institute (HAI) attributions, notions on physical scaling strategies and development of a glossary. The strategy, proposed by a graduate student in the subject "Strategies to the teaching of Administration", was tested through practical application, evaluated and approved by graduate students and teachers. The conditions for its implementation are working with few students, availability of proper classrooms and equipment, and partnership with HAIs. PMID:22165412

  13. Field Review of Fish Habitat Improvement Projects in Central Idaho.

    SciTech Connect

    Beschta, Robert L.; Griffith, Jack; Wesche, Thomas A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho.

  14. Landowner’s Guide for Compatible Use of BPA Rights-of-Way

    SciTech Connect

    2011-02-01

    Keeping transmission lines safe and reliable is a critical priority for the Bonneville Power Administration. The key element in achieving those objectives is BPA’s ability to construct, operate and maintain its transmission lines and rights-of-way — the area under and around the lines. You can help BPA keep these rights-of-way clear of trees, brush and structures that could affect the safety or reliability of the transmission system. Prior to planting, digging, or constructing within BPA’s rights-of-way, fill out BPA’s Land Use Application Form. The information you provide on the application helps BPA understand your proposed use and the potential impacts to public safety, and the safety of our crews. BPA also reviews the application to determine whether a proposed use of land is compatible with the construction, operation and maintenance of BPA transmission lines. Coordinating with BPA early in your planning process can keep you safe and avoid wasting time and money.

  15. Renewable Energy Demonstration Project by the National Renewable Energy Laboratory and the General Services Administration

    NASA Astrophysics Data System (ADS)

    Carlisle, Nancy; Hoo, Ed; Westby, Robert; Hancock, Ed; Lu, J.

    1994-11-01

    The Energy Policy Act of 1992 (EPACT) requires the General Services Administration (GSA) to implement a solar energy program to demonstrate and evaluate the performance of available technologies expected to have widespread commercial application. The GSA decided to carry out the project at the Denver Federal Center because of its proximity to the National Renewable Energy Laboratory (NREL). The location was thought to be of mutual benefit to NREL and the GSA: it provides NREL an opportunity to deploy technology and it provides the GSA an opportunity to gain a hands-on learning experience with renewables. The GSA plans to document their experience and use it as a case study in part of a larger training effort on renewable energy. This paper describes the technology selection process and provides an update on the status of the project.

  16. Grande Ronde Model Watershed Program Administration and Habitat Projects, Annual Progress Report, Project Period: Program Administration: January 1, 1997 - December 31, 1997 Habitat Projects: January 1, 1997 - March 31, 1998.

    SciTech Connect

    Noyes, Cecilia; Kuchenbecker, Lyle; Perry, Patty

    1998-10-28

    This agreement provided funding for operation and administration of the Grande Ronde Model Watershed Program including staffing of an Executive Director, Program Planner, and clerical personnel. The contract covers maintaining program services, project planning, subwatershed plans (CRMP's), public involvement and education, interagency coordination/clearing house, monitoring, and technical support activities that have taken place in the Grande Ronde basin. Cost-share has been received from the Bureau of Reclamation and the Governor's Watershed Enhancement Board.

  17. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

    2010-03-17

    The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides

  18. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  19. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  20. Sex specific impact of perinatal bisphenol A (BPA) exposure over a range of orally administered doses on rat hypothalamic sexual differentiation

    PubMed Central

    McCaffrey, Katherine A.; Jones, Brian; Mabrey, Natalie; Weiss, Bernard; Swan, Shanna H.; Patisaul, Heather B.

    2013-01-01

    Bisphenol A (BPA) is a high volume production chemical used in polycarbonate plastics, epoxy resins, thermal paper receipts, and other household products. The neural effects of early life BPA exposure, particularly to low doses administered orally, remain unclear. Thus, to better characterize the dose range over which BPA alters sex specific neuroanatomy, we examined the impact of perinatal BPA exposure on two sexually dimorphic regions in the anterior hypothalamus, the sexually dimorphic nucleus of the preoptic area (SDN-POA) and the anterioventral periventricular (AVPV) nucleus. Both are sexually differentiated by estradiol and play a role in sex specific reproductive physiology and behavior. Long Evans rats were prenatally exposed to 10, 100, 1000, 10,000 mg/kg bw/day BPA through daily, noninvasive oral administration of dosed-cookies to the dams. Offspring were reared to adulthood. Their brains were collected and immunolabeled for tyrosine hydroxylase (TH) in the AVPV and calbindin (CALB) in the SDN-POA. We observed decreased TH-ir cell numbers in the female AVPV across all exposure groups, an effect indicative of masculinization. In males, AVPV TH-ir cell numbers were significantly reduced in only the BPA 10 and BPA 10,000 groups. SDN-POA endpoints were unaltered in females but in males SDN-POA volume was significantly lower in all BPA exposure groups. CALB-ir was significantly lower in all but the BPA 1000 group. These effects are consistent with demasculinization. Collectively these data demonstrate that early life oral exposure to BPA at levels well below the current No Observed Adverse Effect Level (NOAEL) of 50 mg/kg/day can alter sex specific hypothalamic morphology in the rat. PMID:23500335

  1. Administrative Aspects of Technology Implementation in Special Education. A Synthesis of Information from Eight Federally-Funded Projects.

    ERIC Educational Resources Information Center

    Office of Special Education and Rehabilitative Services (ED), Washington, DC. Div. of Innovation and Development.

    This paper reviews and synthesizes information on the administrative aspects of technology implementation in special education, based on the findings of eight federally funded projects sponsored by the Division of Innovation and Development of the Office of Special Education Programs. Three of the projects specifically focused on administrative…

  2. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect

    Bradbury, Allen; Slavin, Katie

    1998-10-28

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  3. Chapter 4: Teachers' and Administrators' Perceptions of the Saber-Tooth Project Reform and of Their Changing Workplace Conditions.

    ERIC Educational Resources Information Center

    Doutis, Panayiotis; Ward, Phillip

    1999-01-01

    Describes changing workplace conditions encountered by middle school physical education teachers and administrators engaged in the Saber-Tooth Project, sharing data from interviews about their perspectives of this project. Findings are organized around the themes of collegiality, planning and assessment, and professionalism, all of which empowered…

  4. School Capital Manual. An Interim Guide for School Boards, Administrators, Facility Planners and Consultants Who Engage in School Building Projects.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton.

    This manual is intended for use by the Alberta, Canada, school boards, administrators, consultants, education staff, and other individuals involved in school building projects. The purpose of the School Capital Plan, funding, and Alberta Education's funding framework are detailed. The school building project components of the School Capital Plan…

  5. Relationships between Western Area Power Administration`s power marketing program and hydropower operations at Salt Lake City area integrated projects

    SciTech Connect

    Veselka, T.D.; Folga, S.; Poch, L.A.

    1995-03-01

    This technical memorandum provides background information on the Western Area Power Administration (Western) and the physical characteristics of the Salt Lake City Area Integrated Projects (SLCA/IP) hydropower plants, which include the Colorado River Storage Project, the Rio Grande Project, and the Collbran Project. In addition, the history, electrical capacity, storage capacity, and flow restrictions at each dam are presented. An overview of Western`s current programs and services, including a review of statutory authorities, agency discretion, and obligations, is also provided. The variability of SLCA/IP hourly generation under various alternative marketing strategies and purchasing programs is discussed. The effects of Western`s services, such as area load control, outage assistance, and transmission, on SLCA/IP power plant operations are analyzed.

  6. Sustainability in Primary Care and Mental Health Integration Projects in Veterans Health Administration

    PubMed Central

    Ford, James H.; Krahn, Dean; Oliver, Karen Anderson; Kirchner, JoAnn

    2015-01-01

    Objective To explore staff perceptions about sustainability, commitment to change, participation in change process, and information received about the change project within the Veterans Administration Primary Care and Mental Health Integration (PC-MHI) initiative and to examine differences from the Veterans Health Administration Mental Health Systems Redesign (MHSR) initiative. Data Sources Surveys of change team members involved in the Veterans Affairs PC-MHI and MHSR initiatives. Study Design One-way analysis of variance examined the relationship between commitment, participation and information, and sustainability. Differences in PC-MHI sustainability were explored by location and job classification. Staff sustainability perceptions were compared with MHSR results. Principal Findings Sustainability differed by staff discipline. Difference between MHSR and PC-MHI existed by job function and perceptions about the change benefits. Participation in the change process and information received about the change process were positively correlated with sustainability. Staff commitment to change was positively associated with staff perceptions about the benefits of change and staff attitudes toward change. Conclusions Sustainability is an important part of organizational change efforts. Change complexity seems to influence perception about sustainability and impacts staff perceptions about the benefits of change. These perceptions seem to be driven by the information received and opportunities to participate in the change process. Further research is needed to understand how information and participation influence sustainability and affect employee commitment to change. PMID:23011071

  7. Projecting the Need for California School Administrators over 2010/11-2017/18: The Effects of Projected Retirement and Projected Changes in Student Enrollment over Two-Year Increments. REL Technical Brief. REL 2011-No. 016

    ERIC Educational Resources Information Center

    Fong, Anthony B.; Makkonen, Reino

    2011-01-01

    This technical brief projects the need for new school-site administrators (principals and vice-principals) in California by region in two-year increments over 2010/11-2017/18. It builds on an earlier Regional Educational Laboratory West report that projected the aggregate need for school administrators over 2008/09-2017/18 based on projected…

  8. 76 FR 15970 - Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability..., and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative... single- circuit transmission line from BPA's new Central Ferry Substation near the Port of Central...

  9. Environmental Assessment : Happy Valley [Substation Project].

    SciTech Connect

    United States. Bonneville Power Administration.

    1982-05-01

    The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

  10. An oscillation detector used in the BPA power system disturbance monitor

    SciTech Connect

    Haver, J.F.; Vakili, F. )

    1990-02-01

    In 1987 an oscillation trigger was developed for the power system disturbance monitor that the Bonneville Power Administration (BPA) operates at the Dittmer Control Center. The trigger logic resembles that for extracting information from an amplitude-modulated carrier wave. Operating experience shows the trigger to be sensitive, reliable, and versatile. This paper describes the trigger and its basic principles in detail. Filter responses curves and FORTRAN source code are provided for use by utilities having similar needs.

  11. A new approach to synergize academic and guideline-compliant research: the CLARITY-BPA research program.

    PubMed

    Schug, Thaddeus T; Heindel, Jerrold J; Camacho, Luísa; Delclos, K Barry; Howard, Paul; Johnson, Anne F; Aungst, Jason; Keefe, Dennis; Newbold, Retha; Walker, Nigel J; Thomas Zoeller, R; Bucher, John R

    2013-09-01

    Recently, medical research has seen a strong push toward translational research, or "bench to bedside" collaborations, that strive to enhance the utility of laboratory science for improving medical treatment. The success of that paradigm supports the potential application of the process to other fields, such as risk assessment. Close collaboration among academic, government, and industry scientists may enhance the translation of scientific findings to regulatory decision making. The National Toxicology Program (NTP), National Institute of Environmental Health Sciences (NIEHS), and U.S. Food and Drug Administration (FDA) developed a consortium-based research program to link more effectively academic and guideline-compliant research. An initial proof-of-concept collaboration, the Consortium Linking Academic and Regulatory Insights on BPA Toxicity (CLARITY-BPA), uses bisphenol A (BPA) as a test chemical. The CLARITY-BPA program combines a core perinatal guideline-compliant 2-year chronic toxicity study with mechanistic studies/endpoints conducted by academic investigators. Twelve extramural grantees were selected by NIEHS through an RFA-based initiative to participate in the overall study design and conduct disease-relevant investigations using tissues and animals from the core study. While the study is expected to contribute to our understanding of potential effects of BPA, it also has ramifications beyond this specific focus. Through CLARITY-BPA, NIEHS has established an unprecedented level of collaboration among extramural grantees and regulatory researchers. By drawing upon the strengths of academic and regulatory expertise and research approaches, CLARITY-BPA represents a potential new model for filling knowledge gaps, enhancing quality control, informing chemical risk assessment, and identifying new methods or endpoints for regulatory hazard assessments. PMID:23747832

  12. Research Projects in Industrial Technology.

    SciTech Connect

    United States. Bonneville Power Administration. Industrial Technology Section.

    1990-06-01

    The purpose of this booklet is to briefly describe ongoing and completed projects being carried out by Bonneville Power Administration's (BPA) Industrial Technology Section. In the Pacific Northwest, the industrial sector is the largest of the four consuming sectors. It accounted for thirty-nine percent of the total firm demand in the region in 1987. It is not easy to asses the conservation potential in the industrial sector. Recognizing this, the Northwest Power Planning Council established an objective to gain information on the size, cost, and availability of the conservation resource in the industrial sector, as well as other sectors, in its 1986 Power Plan. Specifically, the Council recommended that BPA operate a research and development program in conjunction with industry to determine the potential costs and savings from efficiency improvements in industrial processes which apply to a wide array of industrial firms.'' The section, composed of multidisciplinary engineers, provides technical support to the Industrial Programs Branch by designing and carrying out research relating to energy conservation in the industrial sector. The projects contained in this booklet are arranged by sector --industrial, utility, and agricultural -- and, within each sector, chronologically from ongoing to completed, with those projects completed most recently falling first. For each project the following information is given: its objective approach, key findings, cost, and contact person. Completed projects also include the date of completion, a report title, and report number.

  13. Wind River Watershed Project; Volume II of III Reports F and G, 1998 Annual Report.

    SciTech Connect

    Connolly, Patrick J.

    1999-11-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds.

  14. The Holiday Shop. An Integrated Project for Administrative Support Occupations II To Be Used the Weeks Preceding the Christmas Holidays.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education.

    This seasonal project integrates the skills of typing, photocopying, calculating, composing, alphabetizing, and human relations, which the student has acquired during the first part of the Administrative Support Occupations II course. The activity is a simulation that involves a small, specialty, mail-order business selling novelty items for…

  15. Common Core Curriculum for Vocational Education. Category D: Administration and Supervision. D-2: Writing a Vocational Education Project/Budget.

    ERIC Educational Resources Information Center

    Bain, William

    This module on writing a vocational education project/budget is one of a set of eight on administration and supervision and is part of a larger series of thirty-four modules constituting a core curriculum intended for use in the professional preparation of vocational educators in the areas of agricultural, business, home economics, and industrial…

  16. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Are proposed projects under the Rural Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies §...

  17. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322...

  18. NEPA meets government reinvention: Bonneville Power Administration`s business plan E.I.S.

    SciTech Connect

    Wolfe, D.V.; Alton, C.; Linehan, A.O.

    1995-12-01

    During the early 1990`s Bonneville Power Administration (BPA) found its role as the Pacific Northwest`s largest wholesale marketer of electric power challenged by energy market deregulation, increasing competition from utilities and non-utility power sources, and uncertainty about future costs. Moreover, the rapid decline of endangered salmon stocks appeared to be leading to significant changes in the operations of the Columbia River hydroelectric system and limitations in the amount of hydro power BPA could sell its utility customers. In response, BPA began a fundamental review of all of its power and transmission products, rates, organization, and administrative procedures. BPA`s reinvention was clearly a major Federal action subject to NEPA, and the Business Plan EIS quickly became the focus of both BPA`s effort to question the fundamental mechanisms of its operations, and of the many customers, environmental organizations, and interest groups that watchdog BPA`s activities. In developing the Business Plan EIS, BPA faced multiple challenges: (1) complex, interrelated issues, including power sales contract terms, power rates, hydroelectric operations and salmon survival, transmission system deregulation, energy resource choices, conservation program reinvention, and fish and wildlife program management reform; (2) drawing appropriate boundaries around the subject of analysis instead of letting the EIS become the {open_quotes}black hole{close_quotes} for every regional environmental issue; (3) framing and evaluating broad policy choices in an understandable and useful manner without getting lost in the detail of the myriad decisions BPA faces; (4) keeping pace with evolving management thinking about BPA`s new direction; (5) linking Business Plan choices to market responses and ultimately to environmental impacts. The Business Plan EIS is an innovative effort to address broad policy directions, marketing relationships, and environmental impacts.

  19. Chronic High Dose Intraperitoneal Bisphenol A (BPA) Induces Substantial Histological and Gene Expression Alterations in Rat Penile Tissue Without Impairing Erectile Function

    PubMed Central

    Kovanecz, Istvan; Gelfand, Robert; Masouminia, Maryam; Gharib, Sahir; Segura, Denesse; Vernet, Dolores; Rajfer, Jacob; Li, De-Kun; Liao, Chun Yang; Kannan, Kurunthachalam; Gonzalez-Cadavid, Nestor F.

    2014-01-01

    dose of BPA developed hypogonadism and a corporal histo- and molecular-pathology usually associated with ED, no changes were detected in erectile function as measured by EFS and cavernosometry. Further studies using alternate routes of BPA administration with various doses and length of exposure are needed to expand these findings. Kovanecz I, Gelfand R, Masouminia M, Gharib S, Segura D, Vernet D, Rajfer J, Li DK, Liao CY, Kannan K, and Gonzalez-Cadavid NF. Chronic high dose intraperitoneal bisphenol A (BPA) induces substantial histological and gene expression alterations in rat penile tissue without impairing erectile function. PMID:24134786

  20. Power Subscription Strategy: Administrator`s Record of Decision.

    SciTech Connect

    United States. Bonneville Power Administration

    1998-12-01

    The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

  1. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    SciTech Connect

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  2. Expression of fibronectin binding protein A (FnBPA) from Staphylococcus aureus at the cell surface of Lactococcus lactis improves its immunomodulatory properties when used as protein delivery vector.

    PubMed

    Almeida, Juliana F; Breyner, Natalia M; Mahi, Miloud; Ahmed, Bensoltane; Benbouziane, Bouasria; Boas, Priscilla C B Vilas; Miyoshi, Anderson; Azevedo, Vasco; Langella, Philippe; Bermúdez-Humarán, Luis G; Chatel, Jean-Marc

    2016-03-01

    A recombinant strain of Lactococcus lactis displaying a cell-surface anchored fibronectin binding protein A (FnBPA) from Staphylococcus aureus (LL-FnBPA) had been shown to be more efficient in delivering plasmid than its wild-type counterpart both in vitro and in vivo, and have the ability to orientate the immune response toward a Th2 profile in a context of a DNA vaccination. The aim of this work was to test whether this LL-FnBPA strain could shape the immune response after mucosal administration in mice. For this, we used a mouse model of human papilloma virus (HPV)-induced cancer and a L. lactis strain displaying at its cell surface both HPV-16-E7 antigen (LL-E7) and FnBPA (LL-E7+FnBPA). Our results revealed a more efficient systemic Th1 immune response with recombinant LL-E7+FnBPA. Furthermore, mice vaccinated with LL-E7+FnBPA were better protected when challenged with HPV-16-induced tumors. Altogether, the results suggest that FnBPA displays adjuvant properties when used in the context of mucosal delivery using L. lactis as a live vector. PMID:26854905

  3. BPA Committed to Northwest Values

    SciTech Connect

    2010-09-01

    The Columbia River has been called the “crown jewel” of the Pacific Northwest. There is no question it is among the region’s greatest assets — supplying low-cost clean hydropower, making deserts bloom thanks to irrigation and providing navigation, recreation and a home for many species of fish and wildlife. The Bonneville Power Administration is proud to be a steward of this great resource. Our mission is to serve the people and environment of the Pacific Northwest. We sell wholesale power from Grand Coulee Dam and 30 other Northwest federal dams to Northwest utilities, including public utility districts, rural electric cooperatives and municipal utility departments, as well as investor-owned utilities. We operate three-fourths of the region’s high voltage transmission system that delivers that power. But, as a federal agency, we are not just a power marketer. We have public responsibilities that include, among many, promoting energy efficiency, facilitating development of renewable power, protecting fish and wildlife affected by hydro development, honoring treaty obligations to tribes and promoting a reliable energy future through collaboration and partnerships. This document describes our responsibilities to citizens in the Pacific Northwest.

  4. 75 FR 30364 - Mt. Hood and Willamette National Forests, Oregon; Cascade Crossing Transmission Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... as it crossed National Forest lands, then follow the existing Bonneville Power Administration (BPA) transmission lines through National Forest lands. The second alternative would follow the existing...

  5. Supplement Analysis for the Watershed Management Program EIS - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence

    SciTech Connect

    N /A

    2004-08-04

    The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The proposed fence will meet or exceed BPA's minimum requirement of a 35-foot setback from the stream. Fence posts will be driven into the ground with a post ponder. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing.

  6. A round robin approach to the analysis of bisphenol a (BPA) in human blood samples

    PubMed Central

    2014-01-01

    Background Human exposure to bisphenol A (BPA) is ubiquitous, yet there are concerns about whether BPA can be measured in human blood. This Round Robin was designed to address this concern through three goals: 1) to identify collection materials, reagents and detection apparatuses that do not contribute BPA to serum; 2) to identify sensitive and precise methods to accurately measure unconjugated BPA (uBPA) and BPA-glucuronide (BPA-G), a metabolite, in serum; and 3) to evaluate whether inadvertent hydrolysis of BPA-G occurs during sample handling and processing. Methods Four laboratories participated in this Round Robin. Laboratories screened materials to identify BPA contamination in collection and analysis materials. Serum was spiked with concentrations of uBPA and/or BPA-G ranging from 0.09-19.5 (uBPA) and 0.5-32 (BPA-G) ng/mL. Additional samples were preserved unspiked as ‘environmental’ samples. Blinded samples were provided to laboratories that used LC/MSMS to simultaneously quantify uBPA and BPA-G. To determine whether inadvertent hydrolysis of BPA metabolites occurred, samples spiked with only BPA-G were analyzed for the presence of uBPA. Finally, three laboratories compared direct and indirect methods of quantifying BPA-G. Results We identified collection materials and reagents that did not introduce BPA contamination. In the blinded spiked sample analysis, all laboratories were able to distinguish low from high values of uBPA and BPA-G, for the whole spiked sample range and for those samples spiked with the three lowest concentrations (0.5-3.1 ng/ml). By completion of the Round Robin, three laboratories had verified methods for the analysis of uBPA and two verified for the analysis of BPA-G (verification determined by: 4 of 5 samples within 20% of spiked concentrations). In the analysis of BPA-G only spiked samples, all laboratories reported BPA-G was the majority of BPA detected (92.2 – 100%). Finally, laboratories were more likely to be verified

  7. No Evidence of Substantive Nonresponse Bias for the 2011 Administration. SERU Project Technical Report

    ERIC Educational Resources Information Center

    Chatman, Steve

    2011-01-01

    This study of the 2011 administration focused on principal component scores based on the 2008 and 2009 SERU (Student Experience in the Research University) administrations. The first analysis is a traditional nonresponse examination where the response rates of various groups are compared to determine if the responding students represent the larger…

  8. Bisphenol A (BPA) in U.S. food.

    PubMed

    Schecter, Arnold; Malik, Noor; Haffner, Darrah; Smith, Sarah; Harris, T Robert; Paepke, Olaf; Birnbaum, Linda

    2010-12-15

    Bisphenol A (BPA) is a chemical used for lining metal cans and in polycarbonate plastics, such as baby bottles. In rodents, BPA is associated with early sexual maturation, altered behavior, and effects on prostate and mammary glands. In humans, BPA is associated with cardiovascular disease, diabetes, and male sexual dysfunction in exposed workers. Food is a major exposure source. We know of no studies reporting BPA in U.S. fresh food, canned food, and food in plastic packaging in peer reviewed journals. We measured BPA levels in 105 fresh and canned foods, foods sold in plastic packaging, and in cat and dog foods in cans and plastic packaging. We detected BPA in 63 of 105 samples, including fresh turkey, canned green beans, and canned infant formula. Ninety-three of these samples were triplicates which had similar detected levels. Detected levels ranged from 0.23 to 65.0 ng/g ww and were not associated with type of food or packaging but did vary with pH. BPA levels were higher for foods of pH 5 compared to more acidic and alkaline foods. Detected levels were comparable to those found by others. Further research is indicated to determine BPA levels in U.S. food in larger, representative sampling. PMID:21038926

  9. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  10. Kalispell Maintenance Headquarters Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-01-01

    The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

  11. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  12. Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    SciTech Connect

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.; Lu, Shuai; Miller, Carl H.; Nyeng, Preben; Ma, Jian; Hammerstrom, Donald J.; Vishwanathan, Vilanyur V.

    2008-06-30

    The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

  13. Statewide Project to Include Aging Content in Colleges of Pharmacy. An Administration on Aging Project. Final Report.

    ERIC Educational Resources Information Center

    Rousch, Robert

    The project described in this report was designed to: (1) address the lack of adequately trained faculty members needed to introduce geriatrics within colleges of pharmacy, (2) facilitate the use of existing materials within the educational program provided pharmacy students, (3) teach a geriatric pharmacy course twice at each of Texas' three…

  14. The Pine Ridge-Mayo National Aeronautics and Space Administration Telemedicine Project: Program Activities and Participant Reactions

    NASA Technical Reports Server (NTRS)

    Kottke, T. E.; Little Finger, L.; Trapp, M. A.; Panser, L. A.; Novotny, P. J.

    1996-01-01

    OBJECTIVE: To determine the response of participants to the Pine Ridge-Mayo National Aeronautics and Space Administration telemedicine project. DESIGN: We describe a 3-month demonstration project of medical education and clinical consultations conducted by means of satellite transmission. Postparticipation questionnaires and a postproject survey were used to assess the success of the activity. MATERIAL AND METHODS: Patients and employees at the Pine Ridge Indian Health Service Hospital in southwestern South Dakota and employees at Mayo Clinic Rochester participated in a telemedicine project, after which they completed exit surveys and a postproject questionnaire to ascertain the acceptability of this mode of health care. RESULTS: Almost all Pine Ridge and Mayo Clinic participants viewed the project as beneficial. The educational sessions received favorable evaluations, and almost two-thirds of the patients who completed evaluations thought the consultation had contributed to their medical care. More than 90% of the respondents from Pine Ridge and more than 85% of the respondents from Mayo Clinic Rochester said that they would recommend participation in this project to others. More than 90% of respondents from Pine Ridge and 80% of Mayo respondents agreed with the statement that the project should continue. CONCLUSION: These data suggest that a program of clinical consultation services, professional education, and patient education available by telemedicine might be viewed as beneficial.

  15. Health risk of exposure to Bisphenol A (BPA).

    PubMed

    Konieczna, Aleksandra; Rutkowska, Aleksandra; Rachoń, Dominik

    2015-01-01

    Bisphenol A (BPA) belongs to chemicals that are produced in large quantities worldwide. It is commonly used as monomer in polycarbonate synthesis, plasticizer in the production of epoxy resins, as well as an additive for the elimination of surfeit of hydrochloric acid during the polyvinyl chloride (PVC) production. BPA is not only used in the production of plastics intended to a direct contact with food, including plastic packaging and kitchenware, but also in inner coatings of cans and jar caps. There are various routes of human exposure to this substance such as oral, by inhalation and transdermal. The main sources of exposure to BPA include food packaging and dust, dental materials, healthcare equipment, thermal paper, toys and articles for children and infants. BPA is metabolized in the liver to form bisphenol A glucuronide and mostly in this form is excreted with urine. Due to its phenolic structure BPA has been shown to interact with estrogen receptors and to act as agonist or antagonist via estrogen receptor (ER) dependent signalling pathways. Therefore, BPA has been shown to play a role in the pathogenesis of several endocrine disorders including female and male infertility, precocious puberty, hormone dependent tumours such as breast and prostate cancer and several metabolic disorders including polycystic ovary syndrome (PCOS). Because of the constant, daily exposure and its tendency to bio-accumulation, BPA seems to require special attention such as biomonitoring. This observation should include clinical tests of BPA concentration in the urine, which is not only one of the best methods of evaluation of the exposure to this compound, but also the dependence of the daily intake of BPA and the risk of some endocrine disorders. PMID:25813067

  16. Handbook of Research on Educational Administration. A Project of the American Educational Research Association. Second Edition.

    ERIC Educational Resources Information Center

    Murphy, Joseph, Ed.; Louis, Karen Seashore, Ed.

    This collection of 24 essays examines emerging trends in the educational, organizational, and institutional domains of schooling, and in the larger contexts that set the stage for those discussions. The volume is divided into three parts. Part 1, "The Development of Educational Administration," includes "A Brief History of Scholarship on…

  17. The Frustrated Nerds Project--Resources for Systems Administrators in Higher Education: A Resource Webliography

    ERIC Educational Resources Information Center

    Henninger, Jessamyn; Aber, Susan Ward

    2010-01-01

    Systems Architects and Information Technology administrators working in higher education help faculty, staff, and student computer users. Yet, who helps them? What resources do these professionals value? A case study was conducted using purposeful sampling and data collection through electronic interview to gather the preferred information-seeking…

  18. External Degree Project. Summaries of Areas of Competency in Business Administration.

    ERIC Educational Resources Information Center

    Syracuse Univ., NY. School of Management.

    The School of Management at Syracuse University recently undertook the task of classifying the kinds of competency one should demonstrate in order to function effectively in positions within the field of Business Administration. The study is aimed at identifying the mix of technical skills, general ability, and background knowledge that fits…

  19. Projected Issues in the Practice of Educational Administration--the Australian Context.

    ERIC Educational Resources Information Center

    Jecks, Douglas A.

    At least eight issues are currently facing Australian educational administrators: (1) Since 1974, as economic conditions have worsened, there has been a loss of public confidence in and support for education. (2) There is a public demand to get full value for each dollar spent on education. (3) The media, too, have criticized education because of…

  20. Handbook of Research on Educational Administration. A Project of the American Educational Research Association. Second Edition.

    ERIC Educational Resources Information Center

    Murphy, Joseph, Ed.; Louis, Karen Seashore, Ed.

    This collection of 24 essays examines emerging trends in the educational, organizational, and institutional domains of schooling, and in the larger contexts that set the stage for those discussions. The volume is divided into three parts. Part 1, "The Development of Educational Administration," includes "A Brief History of…

  1. BPA uptake in rat tissues after partial hepatectomy

    SciTech Connect

    Slatkin, D.N.; Nawrocky, M.M.; Coderre, J.A.; Fisher, C.D.; Joel, D.D.; Lombardo, D.T.; Micca, P.L.

    1996-12-31

    In boron neutron capture therapy (BNCT), boron given as boronophenylalanine (BPA) accumulates transiently not only in tumors but also in normal tissues. Average boron concentrations in transplanted 9L gliosarcoma tumors of 20 rats were 2.5 to 3.7 times concentrations found in blood. Although boron levels in a variety of tissues were also higher than blood the concentrations were less than the lowest found in the tumor. Further note than although BPA is a structural analogue of phenylalanine (Phe), the pathway of BPA uptake into regenerating liver may not be linked to Phe uptake mechanisms.

  2. Potential Projective Material on the Rorschach: Comparing Comprehensive System Protocols to Their Modeled R-Optimized Administration Counterparts.

    PubMed

    Pianowski, Giselle; Meyer, Gregory J; Villemor-Amaral, Anna Elisa de

    2016-01-01

    Exner ( 1989 ) and Weiner ( 2003 ) identified 3 types of Rorschach codes that are most likely to contain personally relevant projective material: Distortions, Movement, and Embellishments. We examine how often these types of codes occur in normative data and whether their frequency changes for the 1st, 2nd, 3rd, 4th, or last response to a card. We also examine the impact on these variables of the Rorschach Performance Assessment System's (R-PAS) statistical modeling procedures that convert the distribution of responses (R) from Comprehensive System (CS) administered protocols to match the distribution of R found in protocols obtained using R-optimized administration guidelines. In 2 normative reference databases, the results indicated that about 40% of responses (M = 39.25) have 1 type of code, 15% have 2 types, and 1.5% have all 3 types, with frequencies not changing by response number. In addition, there were no mean differences in the original CS and R-optimized modeled records (M Cohen's d = -0.04 in both databases). When considered alongside findings showing minimal differences between the protocols of people randomly assigned to CS or R-optimized administration, the data suggest R-optimized administration should not alter the extent to which potential projective material is present in a Rorschach protocol. PMID:26963932

  3. Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

  4. Networking with Historically Black Colleges and Universities: Cultural Diversity in Public Administration Education at Indiana State University. A Final Report on a Cultural Diversity Innovation in Public Administration Education Project, 1992-1993.

    ERIC Educational Resources Information Center

    Mohapatra, Manindra K.; McDowell, James L.

    This final report describes a Cultural Diversity Innovation project implemented in 1992-93 at Indiana State University (ISU). The central objective of the project was to enrich cultural diversity elements in the Masters in Public Administration (MPA) curriculum at ISU through the presentations of visiting faculty from historically black colleges…

  5. Bonneville Power Administration 1997 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  6. Using Ensemble Streamflows for Power Marketing at Bonneville Power Administration

    NASA Astrophysics Data System (ADS)

    Barton, S. B.; Koski, P.

    2014-12-01

    Bonneville Power Administration (BPA) is a federal non-profit agency within the Pacific Northwest responsible for marketing the power generated from 31 federal hydro projects throughout the Columbia River Basin. The basin encompasses parts of five states and portions of British Columbia, Canada. BPA works with provincial entities, federal and state agencies, and tribal members to manage the water resources for a variety of purposes including flood risk management, power generation, fisheries, irrigation, recreation, and navigation. This basin is subject to significant hydrologic variability in terms of seasonal volume and runoff shape from year to year which presents new water management challenges each year. The power generation planning group at BPA includes a team of meteorologists and hydrologists responsible for preparing both short-term (up to three weeks) and mid-term (up to 18 months) weather and streamflow forecasts including ensemble streamflow data. Analysts within the mid-term planning group are responsible for running several different hydrologic models used for planning studies. These models rely on these streamflow ensembles as a primary input. The planning studies are run bi-weekly to help determine the amount of energy available, or energy inventory, for forward marketing (selling or purchasing energy up to a year in advance). These studies are run with the objective of meeting the numerous multi-purpose objectives of the basin under the various streamflow conditions within the ensemble set. In addition to ensemble streamflows, an ensemble of seasonal volume forecasts is also provided for the various water conditions in order to set numerous constraints on the system. After meeting all the various requirements of the system, a probabilistic energy inventory is calculated and used for marketing purposes.

  7. ORAL BISPHENOL A (BPA) GIVEN TO RATS AT MODERATE DOSES IS ASSOCIATED WITH ERECTILE DYSFUNCTION, CAVERNOSAL LIPOFIBROSIS, AND ALTERATIONS OF GLOBAL GENE TRANSCRIPTION

    PubMed Central

    Kovanecz, I; Gelfand, R; Masouminia, M; Gharib, S; Segura, D; Vernet, D; Rajfer, J; Li, DK; Kannan, K; Gonzalez-Cadavid, NF

    2013-01-01

    Introduction Bisphenol A (BPA), a suspected reproductive biohazard and endocrine disruptor released from plastics is associated with erectile dysfunction (ED) in occupationally exposed workers. However, in rats, despite the induction of hypogonadism, apoptosis of the penile corporal smooth muscle, fat infiltration into the cavernosal tissue, and changes in global gene expression with the intraperitoneal administration of high dose BPA, ED was not observed. Aims We investigated whether BPA administered orally rather than intraperitoneally to rats for longer periods and lower doses will lead to ED. Main Outcomes Measures ED, histological, and biochemical markers in rat penile tissues. Methods 2.5-month old rats were given drinking water daily without and with BPA at 1 and 0.1 mg/kg/day. Two months later, erectile function was determined by cavernosometry (DIC) and electrical field stimulation (EFS) and serum levels of testosterone (T), estradiol (E2), and BPA were measured. Penile tissue sections were assayed by Masson (smooth muscle (SM)/collagen), Oil Red O (fat), TUNEL (apoptosis), immunohistochemistry for Oct 4 (stem cells), and α-SM actin/ calponin (SM and myofibroblasts), applying quantitative image analysis. Other markers were assayed by western blots. DNA microarrays/microRNA assays defined transcription profiles. Results Orally administered BPA did not affect body weight, but: 1) decreased serum T and E2; 2) reduced the EFS response and increased the DIC drop rate; 3) increased within the corporal tissue the presence of fat, myofibroblasts and apoptosis; 4) lowered the contents of SM and stem cells, but not nerve terminals; and 5) caused alterations of the transcriptional profiles for both mRNA and microRNAs within the penile shaft. Conclusions Long-term exposure of rats to oral BPA,caused a moderate corporal veno-occlusive dysfunction (CVOD), possibly due to alterations within the corporal tissue that pose gene transcriptional changes related to

  8. From BPA to its analogues: Is it a safe journey?

    PubMed

    Usman, Afia; Ahmad, Masood

    2016-09-01

    Bisphenol-A (BPA) is one of the most abundant synthetic chemicals in the world due to its uses in plastics. Its widespread exposure vis-a-vis low dose effects led to a reduction in its safety dose and imposition of ban on its use in infant feeding bottles. This restriction paved the way for the gradual market entry of its analogues. However, their structural similarity to BPA has put them under surveillance for endocrine disrupting potential. The application of these analogues is increasing and so are the studies reporting their toxicity. This review highlights the reasons which led to the ban of BPA and also reports the exposure and toxicological data available on its analogues. Hence, this compilation is expected to answer in a better way whether the replacement of BPA by these analogues is safer or more harmful? PMID:27262103

  9. Bonneville, Power Administration Timing System

    NASA Technical Reports Server (NTRS)

    Martin, Kenneth E.

    1996-01-01

    Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

  10. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  11. The Clearlake Hot Dry Rock geothermal project: Institutional policies, administrative issues, and technical tasks

    SciTech Connect

    Burns, K.L.

    1991-01-01

    The Clearlake Project is a three-party collaboration between the California Energy Commission, City of Clearlake, and Los Alamos National Laboratory. It aims to develop a deep hot, dry geothermal resource under the city. The project is funded by the Commission, and administered by the City. Technical operations are conducted by Laboratory staff and resources seconded from the Hot Dry Rock program. In addition to the normal geothermal exploration problems of predicting geological and geophysical properties of the subsurface, there are uncertainties as to what further material and environmental parameters are relevant, and how they might be measured. In addition to technical factors, policy objectives are an influence in choosing the most appropriate development scenario. 11 refs., 4 figs.

  12. Design of Studies for Development of BPA Fish and Wildlife Mitigation Accounting Policy Phase II, Volume I, 1985-1988 Summary Report.

    SciTech Connect

    Kneese, Allen V.

    1988-08-01

    As the mitigation prescribed by the Regional Act proceeds, the incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative measures and their systemwide implications. It was deemed prudent by the BPA to anticipate this situation by launching a forward-looking research program aimed at providing methodological tools and data suitable for estimating the productivity and cost implications of mitigation alternatives in a timely manner with state-of-the-art accuracy. In this spirit, Resources for the Future (RFF) agreed at the request of the BPA to develop a research program which would provide an analytical system designed to assist the BPA Administrator and other interested and responsible parties in evaluating the ecological and economic aspects of alternative protection, enhancement, and mitigation measures. 12 refs., 4 figs., 1 tab.

  13. National short line railroad database project, 1995-1996: A report to the Federal Railroad Administration

    SciTech Connect

    Benson, D.; Byberg, T.

    1996-06-30

    The objective of the project was to create a central database containing information representing the American short line railroad industry. In the report, processes involved with obtaining, developing, and maintaining the information in the database are discussed. Several data analysis procedures used to help ensure the integrity of the data are addressed. The second annual American Short Line Railroad Association Data Profile for the 1994 Calendar year is also presented in the paper. Further information extracted and comparisons made during the analysis process are described in detail. Discussions on the development of the paper survey and an electronic survey for the third annual data profile for the 1995 calendar year are also presented. The design and implementation of the electronic survey software package are reviewed in detail. The final process presented is the distribution and collection of the 1995 electronic and paper surveys.

  14. The Uses of Research Sponsored by the Administration on Aging (AoA). Case Study No. 6. The Home Equity Conversion Project.

    ERIC Educational Resources Information Center

    Peterson, Kristina; Heinsohn, Ingrid

    This case study, one in a series of research efforts designed to examine the utilization of the Administration on Aging's research, describes the different types of uses of findings of the Home Equity Conversion Project (HECP), which developed ways of converting home equity into usable income. The first chapter describes the project and overviews…

  15. No Effect of Route of Exposure (Oral; Subcutaneous Injection) on Plasma Bisphenol A throughout 24 hr after Administration in Neonatal Female Mice

    PubMed Central

    Taylor, Julia A.; Welshons, Wade V.; vom Saal, Frederick S.

    2008-01-01

    Route of administration of chemicals in adults is an important factor in pharmacokinetics of chemicals such as bisphenol A (BPA), the monomer with estrogenic activity used to make polycarbonate plastic products and to line food and beverage cans. Based on findings in adults it has been proposed (CERHR, 2007) that non-oral routes of administration in newborn rodents would also lead to high exposure relative to oral administration. However, in fetuses and neonates, the enzyme that conjugates BPA (UDP-glucuronosyltransferase) is expressed at low levels, suggesting that there may be no differences in pharmacokinetics between oral and non-oral dosing. We thus conducted an analysis of plasma concentrations of unconjugated 3H-BPA after HPLC separation in postnatal day 3 female mice throughout the 24 hr after administering 3H-BPA orally or via subcutaneous injection at doses above and below the current EPA reference dose. We found no significant difference in plasma BPA based on route of administration in neonatal mice at either dose. However, compared to data from other studies conducted with adults, there was a markedly higher plasma BPA level after oral administration of BPA in newborn mice. This finding sets aside the belief that non-oral administration of BPA renders data as not suitable for consideration of the hazard posed by low-dose exposure to BPA during neonatal life. Therefore the large numbers of BPA studies that used non-oral administration at very low doses during the neonatal period should not be dismissed by scientists or the regulatory community based on route of administration. PMID:18295446

  16. No effect of route of exposure (oral; subcutaneous injection) on plasma bisphenol A throughout 24h after administration in neonatal female mice.

    PubMed

    Taylor, Julia A; Welshons, Wade V; Vom Saal, Frederick S

    2008-02-01

    Route of administration of chemicals in adults is an important factor in pharmacokinetics of chemicals such as bisphenol A (BPA), the monomer with estrogenic activity used to make polycarbonate plastic products and to line food and beverage cans. Based on findings in adults it has been proposed (CERHR, 2007) that non-oral routes of administration in newborn rodents would also lead to high exposure relative to oral administration. However, in fetuses and neonates, the enzyme that conjugates BPA (UDP-glucuronosyltransferase) is expressed at low levels, suggesting that there may be no differences in pharmacokinetics between oral and non-oral dosing. We thus conducted an analysis of plasma concentrations of unconjugated 3H-BPA after HPLC separation in postnatal day 3 female mice throughout the 24h after administering 3H-BPA orally or via subcutaneous injection at doses above and below the current EPA reference dose. We found no significant difference in plasma BPA based on route of administration in neonatal mice at either dose. However, compared to data from other studies conducted with adults, there was a markedly higher plasma BPA level after oral administration of BPA in newborn mice. This finding sets aside the belief that non-oral administration of BPA renders data as not suitable for consideration of the hazard posed by low-dose exposure to BPA during neonatal life. Therefore the large numbers of BPA studies that used non-oral administration at very low doses during the neonatal period should not be dismissed by scientists or the regulatory community based on route of administration. PMID:18295446

  17. The systems approach to airport security: The FAA (Federal Aviation Administration)/BWI (Baltimore-Washington International) Airport demonstration project

    SciTech Connect

    Caskey, D.L.; Olascoaga, M.T.

    1990-01-01

    Sandia National Laboratories has been involved in designing, installing and evaluating security systems for various applications during the past 15 years. A systems approach to security that evolved from this experience was applied to aviation security for the Federal Aviation Administration. A general systems study of aviation security in the United States was concluded in 1987. One result of the study was a recommendation that an enhanced security system concept designed to meet specified objectives be demonstrated at an operational airport. Baltimore-Washington International Airport was selected as the site for the demonstration project which began in 1988 and will be completed in 1992. This article introduced the systems approach to airport security and discussed its application at Baltimore-Washington International Airport. Examples of design features that could be included in an enhanced security concept also were presented, including details of the proposed Ramps Area Intrusion Detection System (RAIDS).

  18. Enhanced removal of aqueous BPA model compounds using Metalloligs.

    PubMed

    Franz, Douglas M; Martin, Dean F

    2014-01-01

    A model compound, 4-(t-butyl)phenol, was used as a substitute for BPA (bisphenol acetone or Bisphenol A) a material used for the production of a large volume of common plastics. Unfortunately, BPA is suspected to have estrogenic properties, and there is a suspicion that even small amounts can have a deleterious effect against humans, especially female infants. The model compound has some similarities to BPA, but lacks some of the serious properties of BPA dust. Since other workers have demonstrated the capability of removing BPA from plastics by extraction with saline or alcohol, we studied whether Octolig, a polyethylenediimine supported on silica gel, or transition metal derivatives of Octolig could be used to remove concentrations for model compounds from aqueous solution. Octolig gave modest results 20%, the manganese (II) and iron (III) derivatives gave poor results, Cuprilig was an improvement over those two Metalloligs, but the cobalt(II) derivative was able to remove up to 56% of the model compound. Two methods were studied, batch and column chromatography. Under the conditions used in this study, the batch method was superior. PMID:24279622

  19. Bonneville Power Administration and the Industrial Technologies Program Leverage Support to Overcome Energy Efficiency Barriers in the Northwest

    SciTech Connect

    2010-06-18

    Through its Energy Smart Industrial program, BPA is informing and assisting utilities and industries to have a better understanding of the benefits that come from participating in energy-savings programs. Read about how BPA is encouraging energy efficiency projects through its utilities.

  20. Toxicokinetics of bisphenol A in female DA/Han rats after a single i.v. and oral administration.

    PubMed

    Upmeier, A; Degen, G H; Diel, P; Michna, H; Bolt, H M

    2000-10-01

    Bisphenol A [BPA; 2,2-bis-(4-hydroxyphenyl)-propane] is a monomer used in the manufacture of resins with a wide range of applications, e.g. plastic coatings in the food packaging industry. BPA has been shown to have a weak oestrogenic activity in vitro and in vivo. Despite its low oestrogenic potency there is concern that, as a consequence of slow clearance, BPA might reach biologically significant levels in humans and animals exposed to environmental levels. To address this concern, we assessed the kinetic behaviour of BPA in female DA/Han rats. Groups of female rats received 10 mg BPA/kg body weight intravenously or 10 or 100 mg BPA/kg body weight orally (by gavage). Blood samples were collected at different time-points and plasma was prepared. Free BPA in the samples was isolated by fluid-fluid extraction. BPA was measured by GC-MS which allowed the reliable determination of BPA concentrations as low as approximately 10 ng/ml plasma. Immediately after i.v. administration, the BPA plasma concentration was in the range of about 15 microg/ml and decreased rapidly within the first hour (to 700 ng/ml). The levels declined further (100 ng/ml at 2 h), and after 24 h the analytical detection limit was reached. BPA was detected in plasma as early as 10 min after gavage administration, indicating rapid initial uptake from the gastrointestinal tract. Absorption of BPA was variable. In animals receiving 10 mg/kg, maximal plasma levels were reached after 1.5 h (31 ng/ ml) and 6 h (40 ng/ml). In animals receiving 100 mg/kg, plasma levels reached maxima around 30 min (150 ng/ml) and 3 h (134 ng/ml) after administration. After 48 h BPA was at or below the detection limit in both dose groups. Fluctuations in the BPA plasma concentrations over time point to the possibility of enterohepatic recirculation and protracted absorption from the gastrointestinal tract. Using the area under the concentration-time curves (AUCs), low bioavailabilities of 16.4% and 5.6% were calculated for

  1. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    SciTech Connect

    Casey, Daniel; Malta, Patrick

    1990-12-01

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scale losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.

  2. Fish & Wildlife Annual Project Summary, 1983.

    SciTech Connect

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  3. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  4. Evidence that bisphenol A (BPA) can be accurately measured without contamination in human serum and urine, and that BPA causes numerous hazards from multiple routes of exposure

    PubMed Central

    vom Saal, Frederick S.; Welshons, Wade V.

    2016-01-01

    There is extensive evidence that bisphenol A (BPA) is related to a wide range of adverse health effects based on both human and experimental animal studies. However, a number of regulatory agencies have ignored all hazard findings. Reports of high levels of unconjugated (bioactive) serum BPA in dozens of human biomonitoring studies have also been rejected based on the prediction that the findings are due to assay contamination and that virtually all ingested BPA is rapidly converted to inactive metabolites. NIH and industry-sponsored round robin studies have demonstrated that serum BPA can be accurately assayed without contamination, while the FDA lab has acknowledged uncontrolled assay contamination. In reviewing the published BPA biomonitoring data, we find that assay contamination is, in fact, well controlled in most labs, and cannot be used as the basis for discounting evidence that significant and virtually continuous exposure to BPA must be occurring from multiple sources. PMID:25304273

  5. Evidence that bisphenol A (BPA) can be accurately measured without contamination in human serum and urine, and that BPA causes numerous hazards from multiple routes of exposure.

    PubMed

    vom Saal, Frederick S; Welshons, Wade V

    2014-12-01

    There is extensive evidence that bisphenol A (BPA) is related to a wide range of adverse health effects based on both human and experimental animal studies. However, a number of regulatory agencies have ignored all hazard findings. Reports of high levels of unconjugated (bioactive) serum BPA in dozens of human biomonitoring studies have also been rejected based on the prediction that the findings are due to assay contamination and that virtually all ingested BPA is rapidly converted to inactive metabolites. NIH and industry-sponsored round robin studies have demonstrated that serum BPA can be accurately assayed without contamination, while the FDA lab has acknowledged uncontrolled assay contamination. In reviewing the published BPA biomonitoring data, we find that assay contamination is, in fact, well controlled in most labs, and cannot be used as the basis for discounting evidence that significant and virtually continuous exposure to BPA must be occurring from multiple sources. PMID:25304273

  6. Pharmacokinetics of BPA in gliomas with ultrasound induced blood-brain barrier disruption as measured by microdialysis.

    PubMed

    Yang, Feng-Yi; Lin, Yi-Li; Chou, Fong-In; Lin, Yu-Chuan; Hsueh Liu, Yen-Wan; Chang, Lun-Wei; Hsieh, Yu-Ling

    2014-01-01

    The blood-brain barrier (BBB) can be transiently disrupted by focused ultrasound (FUS) in the presence of microbubbles for targeted drug delivery. Previous studies have illustrated the pharmacokinetics of drug delivery across the BBB after sonication using indirect visualization techniques. In this study, we investigated the in vivo extracellular kinetics of boronophenylalanine-fructose (BPA-f) in glioma-bearing rats with FUS-induced BBB disruption by microdialysis. After simultaneous intravenous administration of BPA and FUS exposure, the boron concentration in the treated brains was quantified by inductively coupled plasma mass spectroscopy. With FUS, the mean peak concentration of BPA-f in the glioma dialysate was 3.6 times greater than without FUS, and the area under the concentration-time curve was 2.1 times greater. This study demonstrates that intracerebral microdialysis can be used to assess local BBB transport profiles of drugs in a sonicated site. Applying microdialysis to the study of metabolism and pharmacokinetics is useful for obtaining selective information within a specific brain site after FUS-induced BBB disruption. PMID:24936788

  7. Urinary BPA measurements in children and mothers from six European member states: Overall results and determinants of exposure.

    PubMed

    Covaci, Adrian; Den Hond, Elly; Geens, Tinne; Govarts, Eva; Koppen, Gudrun; Frederiksen, Hanne; Knudsen, Lisbeth E; Mørck, Thit A; Gutleb, Arno C; Guignard, Cedric; Cocco, Emanuelle; Horvat, Milena; Heath, Ester; Kosjek, Tina; Mazej, Darja; Tratnik, Janja Snoj; Castaño, Argelia; Esteban, Marta; Cutanda, Francisco; Ramos, Juan José; Berglund, Marika; Larsson, Kristin; Jönsson, Bo A G; Biot, Pierre; Casteleyn, Ludwine; Joas, Reinhard; Joas, Anke; Bloemen, Louis; Sepai, Ovnair; Exley, Karen; Schoeters, Greet; Angerer, Jürgen; Kolossa-Gehring, Marike; Fiddicke, Ulrike; Aerts, Dominique; Koch, Holger M

    2015-08-01

    For the first time in Europe, both European-wide and country-specific levels of urinary Bisphenol A (BPA) were obtained through a harmonized protocol for participant recruitment, sampling and quality controlled biomarker analysis in the frame of the twin projects COPHES and DEMOCOPHES. 674 child-mother pairs were recruited through schools or population registers from six European member states (Belgium, Denmark, Luxembourg, Slovenia, Spain and Sweden). Children (5-12 y) and mothers donated a urine sample. Information on socio-demographic characteristics, life style, dietary habits, and educational level of the parents was provided by mothers. After exclusion of urine samples with creatinine values below 300 mg/L or above 3000 mg/L, 653 children and 639 mothers remained for which BPA was measured. The geometric mean (with 95% confidence intervals) and 90th percentile were calculated for BPA separately in children and in mothers and were named "European reference values". After adjustment for confounders (age and creatinine), average exposure values in each country were compared with the mean of the "European reference values" by means of a weighted analysis of variance. Overall geometric means of all countries (95% CI) adjusted for urinary creatinine, age and gender were 2.04 (1.87-2.24) µg/L and 1.88 (1.71-2.07) µg/L for children (n=653) and mothers (n=639), respectively. Multiple regression analysis was used to identify significant environmental, geographical, personal or life style related determinants. Consumption of canned food and social class (represented by the highest educational level of the family) were the most important predictors for the urinary levels of BPA in mothers and children. The individual BPA levels in children were significantly correlated with the levels in their mothers (r=0.265, p<0.001), which may suggest a possible common environmental/dietary factor that influences the biomarker level in each pair. Exposure of the general European

  8. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  9. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  10. Removal of bisphenol A (BPA) from water by various nanofiltration (NF) and reverse osmosis (RO) membranes.

    PubMed

    Yüksel, Suna; Kabay, Nalan; Yüksel, Mithat

    2013-12-15

    The removal of an endocrine disrupting compound, bisphenol A (BPA), from model solutions by selected nanofiltration (NF) and reverse osmosis (RO) membranes was studied. The commercially available membranes NF 90, NF 270, XLE BWRO, BW 30 (Dow FilmTech), CE BWRO and AD SWRO (GE Osmonics) were used to compare their performances for BPA removal. The water permeability coefficients, rejection of BPA and permeate flux values were calculated for all membranes used. No significant changes in their BPA removal were observed for all tight polyamide based NF and RO membranes tested except for loose NF 270 membrane. The polyamide based membranes exhibited much better performance than cellulose acetate membrane for BPA removal. Almost a complete rejection (≥ 98%) for BPA was obtained with three polyamide based RO membranes (BW 30, XLE BWRO and AD SWRO). But cellulose acetate based CE BWRO membrane offered a low and variable (10-40%) rejection for BPA. PMID:23731784

  11. 2007-2008 Annual Progress Report for BPA Grant Exp Restore Walla Walla River Flow

    SciTech Connect

    Bower, Bob

    2009-07-10

    WWBWC and its partners have been working on a wide variety of conservation and aquifer recharge related activities including: monitoring groundwater and surface water conditions, creating a geospatial database for the Walla Walla River valley (project focal area), expanding aquifer recharge testing at the HBDIC site and conducting an extensive outreach/education program by which to share the information, ideas and potential solutions to our current water management issues in this basin. This report is an outline of those activities and is accompanied by individual program-component (attached as appendices) reports for the areas that BPA is assisting to fund these on-the-ground projects along with the innovative research and monitoring being done to further aquifer recharge as a water management tool for the Pacific Northwest.

  12. Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].

    SciTech Connect

    Asotin County Conservation District

    2008-12-10

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

  13. Kalispell Maintenance Headquarters Project : Environmental Assessment and Findings of No Significant Impact.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-12-01

    The facilities needed to maintain and repair Bonneville Power Administration (BPA`s) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area`s maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

  14. Yakima Fisheries Project : Final Environmental Impact Statement : Summary.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin. The State of Washington and the Yakama Indian Nation (YIN) would jointly direct the project. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two action alternatives have been proposed, in addition to the No Action alternative: Alternative (1) would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative (2) (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  15. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  16. THE ESTROGENIC ENDOCRINE DISRUPTING CHEMICAL BISPHENOL A (BPA) AND OBESITY

    PubMed Central

    vom Saal, Frederick S.; Nagel, Susan C.; Coe, Benjamin L.; Angle, Brittany M.; Taylor, Julia A.

    2012-01-01

    There is increasing experimental and epidemiological evidence that fetal programming of genetic systems is a contributing factor in the recent increase in adult obesity and other components of metabolic syndrome. In particular, there is evidence that epigenetic changes associated with the use of manmade chemicals may interact with other factors that influence fetal and postnatal growth in contributing to the current obesity epidemic. The focus of this review is on the developmental effects of estrogenic endocrine disrupting chemicals (EDCs), and more specifically on effects of exposure to the estrogenic EDC bisphenol A (BPA), on adipocytes and their function, and the ultimate impact on adult obesity; BPA exposure also results in impaired reproductive capacity. We discuss the interaction of EDCs with other factors that impact growth during fetal and neonatal life, such as placental blood flow and nutrient transport to fetuses, and how these influence fetal growth and abnormalities in homeostatic control systems required to maintain normal body weight throughout life. PMID:22249005

  17. Enantioselective synthesis of L-(-)-4- boronophenylalanine (L-BPA)

    DOEpatents

    Samsel, Edward G.

    1992-01-01

    A method of making substantially pure L-BPA is disclosed. The method includes the steps of reacting 4-bromobenzaldehyde with ethylene glycol to form 4-bromobenzaldehyde ethylene glycol acetal, sequentially reacting 4-bromobenzaldehyde ethyleneglycol acetal with Mg to produce the Grignard reagent and thereafter reacting with tributyl borate and then converting to an acid environment to form 4-boronobenzaldehyde, reacting 4-boronobenzaldehyde with diethanol amine to form 4-boronobenzaldehyde diethanolamine ester, condensing the 4-boronobenzaldehyde diethanolamine ester with 2-phenyl-2-oxazolin-5-one to form an azlactone, reacting the azlactone with an alkali metal hydroxide to form z-.alpha.-benzoylamino-4-boronocinnamic acid, asymmetrically hydrogenating the z-.alpha.-benzoylamino-4-boronocinnamic acid in the presence of a catalyst of a cheltate complex of rhodium (I) with chiral bisphosphines to form L-(+)-N-benzoyl-4-boronophenylalanine, and thereafter acidifying the L-(+)-N-benzoyl-4-boronophenylalanine in an organic medium to produce L-BPA.

  18. Enantioselective synthesis of L-(-)-4- boronophenylalanine (L-BPA)

    DOEpatents

    Samsel, E.G.

    1992-10-20

    A method of making substantially pure L-BPA is disclosed. The method includes the steps of reacting 4-bromobenzaldehyde with ethylene glycol to form 4-bromobenzaldehyde ethylene glycol acetal, sequentially reacting 4-bromobenzaldehyde ethyleneglycol acetal with Mg to produce the Grignard reagent and thereafter reacting with tributyl borate and then converting to an acid environment to form 4-boronobenzaldehyde, reacting 4-boronobenzaldehyde with diethanol amine to form 4-boronobenzaldehyde diethanolamine ester, condensing the 4-boronobenzaldehyde diethanolamine ester with 2-phenyl-2-oxazolin-5-one to form an azlactone, reacting the azlactone with an alkali metal hydroxide to form z-[alpha]-benzoylamino-4boronocinnamic acid, asymmetrically hydrogenating the z-[alpha]-benzoylamino-4-boronocinnamic acid in the presence of a catalyst of a cheltate complex of rhodium (I) with chiral bisphosphines to form L-(+)-N-benzoyl-4-boronophenylalanine, and thereafter acidifying the L-(+)-N-benzoyl-4-boronophenylalanine in an organic medium to produce L-BPA. 3 figs.

  19. Antelope-Fossil Rebuild Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

  20. Improving the Administration of Vocational Education at the State Level. Projects Supported in Fiscal Year 1975 Under Authority of Section 131(A) of Part C of the Vocational Education Amendments of 1968.

    ERIC Educational Resources Information Center

    Wilson, Jack A.

    Research and development projects for improvement of the administration of vocational education at the State level are described in the report. These projects, supported by the Office of Education for fiscal year 1975, are efforts to develop management information systems that will make available to State administrators information to aid in the…

  1. Developmental programming: interaction between prenatal BPA exposure and postnatal adiposity on metabolic variables in female sheep.

    PubMed

    Veiga-Lopez, Almudena; Moeller, Jacob; Sreedharan, Rohit; Singer, Kanakadurga; Lumeng, Carey; Ye, Wen; Pease, Anthony; Padmanabhan, Vasantha

    2016-02-01

    Among potential contributors for the increased incidence of metabolic diseases is the developmental exposure to endocrine-disrupting chemicals such as bisphenol A (BPA). BPA is an estrogenic chemical used in a variety of consumer products. Evidence points to interactions of BPA with the prevailing environment. The aim of this study was to assess the effects of prenatal exposure to BPA on postnatal metabolic outcomes, including insulin resistance, adipose tissue distribution, adipocyte morphometry, and expression of inflammatory markers in adipose tissue as well as to assess whether postnatal overfeeding would exacerbate these effects. Findings indicate that prenatal BPA exposure leads to insulin resistance in adulthood in the first breeder cohort (study 1), but not in the second cohort (study 2), which is suggestive of potential differences in genetic susceptibility. BPA exposure induced adipocyte hypertrophy in the visceral fat depot without an accompanying increase in visceral fat mass or increased CD68, a marker of macrophage infiltration, in the subcutaneous fat depot. Cohens effect size analysis found the ratio of visceral to subcutaneous fat depot in the prenatal BPA-treated overfed group to be higher compared with the control-overfed group. Altogether, these results suggest that exposure to BPA during fetal life at levels found in humans can program metabolic outcomes that lead to insulin resistance, a forerunner of type 2 diabetes, with postnatal obesity failing to manifest any interaction with prenatal BPA relative to insulin resistance and adipocyte hypertrophy. PMID:26646100

  2. Mineralization of bisphenol A (BPA) by anodic oxidation with boron-doped diamond (BDD) electrode.

    PubMed

    Murugananthan, M; Yoshihara, S; Rakuma, T; Shirakashi, T

    2008-06-15

    Anodic oxidation of bisphenol A (BPA), a representative endocrine disrupting chemical, was carried out using boron-doped diamond (BDD) electrode at galvanostatic mode. The electro-oxidation behavior of BPA at BDD electrode was investigated by means of cyclic voltammetric technique. The extent of degradation and mineralization of BPA were monitored by HPLC and total organic carbon (TOC) value, respectively. The results obtained, indicate that the BPA removal at BDD depends on the applied current density (Iappl), initial concentration of BPA, pH of electrolyte and supporting medium. Galvanostatic electrolysis at BDD anode cause concomitant generation of hydroxyl radical that leads to the BPA destruction. The kinetics for the BPA degradation follows a pseudo-first order reaction with a higher rate constant 12.8x10(-5) s(-1) for higher Iappl value 35.7 mA cm(-2), indicating that the oxidation reaction is limited by Iappl control. Complete mineralization of BPA was achieved regardless of the variables and accordingly the mineralization current efficiency was calculated from the TOC removal measurements. Considering global oxidation process, the effect of supporting electrolytes has been discussed in terms of the electro generated inorganic oxidants. The better performance of BDD anode was proved on a comparative study with Pt and glassy carbon under similar experimental conditions. A possible reaction mechanism for BPA degradation involving three main aromatic intermediates, identified by GC-MS analysis, was proposed. PMID:18023975

  3. Mid-Columbia Coho Salmon Reintroduction Feasibility Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Washington Department of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC`s Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan.

  4. Wind and Solar Data Projections from the U.S. Energy Information Administration: Past Performance and Planned Enhancements

    EIA Publications

    2016-01-01

    In an effort to improve EIA's approach to providing accurate, comprehensive data, and useful projections for policy analysis, EIA has conducted a review of its historical data and projections of capacity, generation, and cost projections for wind and solar technologies. While EIA's internal processes and engagement with stakeholders are both continuing, this paper shares some early findings of EIA's current review of our wind and solar data and projections, focusing in part on some of the issues that have been publicly raised by EIA's critics.

  5. Same Planet, Different Worlds: Why Projects Continue to Fail. A Generalist Review of Project Management with Special Reference to Electronic Research Administration

    ERIC Educational Resources Information Center

    McCormick, Ian

    2006-01-01

    Implementation of IT "solutions" in the context of changes to business processes and efficiency is a common trigger for using formalised project management techniques. The trigger may include topical activities such as job evaluation schemes or quality assurance accreditation. This has led to a blurring of the boundary between projects and…

  6. The Curriculum Improvement Project in Business Careers Programs: Business Manager, Officer Administrator, Real Estate Agent, Real Estate Broker.

    ERIC Educational Resources Information Center

    College of the Mainland, Texas City, TX.

    In 1987, the College of the Mainland undertook a project to update curricula in real estate, business management, and office technology. The project entailed a survey of the labor market to clarify personnel needs in selected fields; the use of the DACUM (Developing a Curriculum) process, which involved expert workers in the creation of task…

  7. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Are proposed projects under the Rural... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply...

  8. Developmental exposure to bisphenol A (BPA) alters sexual differentiation in painted turtles (Chrysemys picta)

    USGS Publications Warehouse

    Jandegian, Caitlin M.; Deem, Sharon L.; Bhandari, Ramji K.; Holliday, Casey M.; Nicks, Diane; Rosenfeld, Cheryl S.; Selcer, Kyle; Tillitt, Donald E.; vom Saal, Fredrick S.; Velez, Vanessa; Yang, Ying; Holliday, Dawn K.

    2015-01-01

    Environmental chemicals can disrupt endocrine signaling and adversely impact sexual differentiation in wildlife. Bisphenol A (BPA) is an estrogenic chemical commonly found in a variety of habitats. In this study, we used painted turtles (Chrysemys picta), which have temperature-dependent sex determination (TSD), as an animal model for ontogenetic endocrine disruption by BPA. We hypothesized that BPA would override TSD and disrupt sexual development. We incubated farm-raised turtle eggs at the male-producing temperature (26 °C), randomly assigned individuals to treatment groups: control, vehicle control, 17β-estradiol (E2, 20 ng/g-egg) or 0.01, 1.0, 100 μg BPA/g-egg and harvested tissues at hatch. Typical female gonads were present in 89% of the E2-treated “males”, but in none of the control males (n = 35). Gonads of BPA-exposed turtles had varying amounts of ovarian-like cortical (OLC) tissue and disorganized testicular tubules in the medulla. Although the percentage of males with OLCs increased with BPA dose (BPA-low = 30%, BPA-medium = 33%, BPA-high = 39%), this difference was not significant (p = 0.85). In all three BPA treatments, SOX9 patterns revealed disorganized medullary testicular tubules and β-catenin expression in a thickened cortex. Liver vitellogenin, a female-specific liver protein commonly used as an exposure biomarker, was not induced by any of the treatments. Notably, these results suggest that developmental exposure to BPA disrupts sexual differentiation in painted turtles. Further examination is necessary to determine the underlying mechanisms of sex reversal in reptiles and how these translate to EDC exposure in wild populations.

  9. Northeast Oregon Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Nez Perce Tribe

    1996-08-01

    Development of the hydropower system in the Columbia River Basin has had far-reaching effects on many species of wildlife. The Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the Federal portion of this system, as allocated to the purpose of power production. BPA needs to mitigate for loss of wildlife habitat in the Snake River Subbasin.

  10. Manpower Planning Data: Selected Professional and Administrative Career Fields: 1966-1970 Trends, 1971-1975 Projections.

    ERIC Educational Resources Information Center

    Veterans Administration, Washington, DC.

    This report provides 5-year (1966-1970) trends for the following manpower planning factors: number of employees in each career field, grade distribution, age, length of service, education, employment of women, promotions, retirement, and losses. These data are intended as an aid to Veterans Administration (VA) management in assessing future…

  11. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  12. Bisphenol Analogues Other Than BPA: Environmental Occurrence, Human Exposure, and Toxicity-A Review.

    PubMed

    Chen, Da; Kannan, Kurunthachalam; Tan, Hongli; Zheng, Zhengui; Feng, Yong-Lai; Wu, Yan; Widelka, Margaret

    2016-06-01

    Numerous studies have investigated the environmental occurrence, human exposure, and toxicity of bisphenol A (BPA). Following stringent regulations on the production and usage of BPA, several bisphenol analogues have been produced as a replacement for BPA in various applications. The present review outlines the current state of knowledge on the occurrence of bisphenol analogues (other than BPA) in the environment, consumer products and foodstuffs, human exposure and biomonitoring, and toxicity. Whereas BPA was still the major bisphenol analogue found in most environmental monitoring studies, BPF and BPS were also frequently detected. Elevated concentrations of BPAF, BPF, and BPS (i.e., similar to or greater than that of BPA) have been reported in the abiotic environment and human urine from some regions. Many analogues exhibit endocrine disrupting effects, cytotoxicity, genotoxicity, reproductive toxicity, dioxin-like effects, and neurotoxicity in laboratory studies. BPAF, BPB, BPF, and BPS have been shown to exhibit estrogenic and/or antiandrogenic activities similar to or even greater than that of BPA. Knowledge gaps and research needs have been identified, which include the elucidation of environmental occurrences, persistence, and fate of bisphenol analogues (other than BPA), sources and pathways for human exposure, effects on reproductive systems and the mammary gland, mechanisms of toxicity from coexposure to multiple analogues, metabolic pathways and products, and the impact of metabolic modification on toxicity. PMID:27143250

  13. Molecular analysis of the apoptotic effects of BPA in acute myeloid leukemia cells

    PubMed Central

    Bontempo, Paola; Mita, Luigi; Doto, Antonella; Miceli, Marco; Nebbioso, Angela; Lepore, Ilaria; Franci, GianLuigi; Menafra, Roberta; Carafa, Vincenzo; Conte, Mariarosaria; De Bellis, Floriana; Manzo, Fabio; Di Cerbo, Vincenzo; Benedetti, Rosaria; D'Amato, Loredana; Marino, Maria; Bolli, Alessandro; Del Pozzo, Giovanna; Diano, Nadia; Portaccio, Marianna; Mita, Gustavo D; Vietri, Maria Teresa; Cioffi, Michele; Nola, Ernesto; Dell'Aversana, Carmela; Sica, Vincenzo; Molinari, Anna Maria; Altucci, Lucia

    2009-01-01

    Background: BPA (bisphenol A or 2,2-bis(4-hydroxy-phenol)propane) is present in the manufacture of polycarbonate plastic and epoxy resins, which can be used in impact-resistant safety equipment and baby bottles, as protective coatings inside metal food containers, and as composites and sealants in dentistry. Recently, attention has focused on the estrogen-like and carcinogenic adverse effects of BPA. Thus, it is necessary to investigate the cytotoxicity and apoptosis-inducing activity of this compound. Methods: Cell cycle, apoptosis and differentiation analyses; western blots. Results: BPA is able to induce cell cycle arrest and apoptosis in three different acute myeloid leukemias. Although some granulocytic differentiation concomitantly occurred in NB4 cells upon BPA treatment, the major action was the induction of apoptosis. BPA mediated apoptosis was caspase dependent and occurred by activation of extrinsic and intrinsic cell death pathways modulating both FAS and TRAIL and by inducing BAD phosphorylation in NB4 cells. Finally, also non genomic actions such as the early decrease of both ERK and AKT phosphorylation were induced by BPA thus indicating that a complex intersection of regulations occur for the apoptotic action of BPA. Conclusion: BPA is able to induce apoptosis in leukemia cells via caspase activation and involvement of both intrinsic and extrinsic pathways of apoptosis. PMID:19538739

  14. 48 CFR 339.7001 - Request for approval to make an award to other than a GSA BPA holder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... make an award to other than a GSA BPA holder. 339.7001 Section 339.7001 Federal Acquisition Regulations... Services 339.7001 Request for approval to make an award to other than a GSA BPA holder. The Contracting... micro-purchase threshold, that obtaining the required services from a source other than a GSA BPA...

  15. 48 CFR 339.7001 - Request for approval to make an award to other than a GSA BPA holder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... make an award to other than a GSA BPA holder. 339.7001 Section 339.7001 Federal Acquisition Regulations... Services 339.7001 Request for approval to make an award to other than a GSA BPA holder. The Contracting... micro-purchase threshold, that obtaining the required services from a source other than a GSA BPA...

  16. Exposure to the BPA-Substitute Bisphenol S Causes Unique Alterations of Germline Function

    PubMed Central

    Chen, Yichang; Qiu, Zhiqun; Lee, Dong Yeon; Telesca, Donatello; Yang, Xia; Allard, Patrick

    2016-01-01

    Concerns about the safety of Bisphenol A, a chemical found in plastics, receipts, food packaging and more, have led to its replacement with substitutes now found in a multitude of consumer products. However, several popular BPA-free alternatives, such as Bisphenol S, share a high degree of structural similarity with BPA, suggesting that these substitutes may disrupt similar developmental and reproductive pathways. We compared the effects of BPA and BPS on germline and reproductive functions using the genetic model system Caenorhabditis elegans. We found that, similarly to BPA, BPS caused severe reproductive defects including germline apoptosis and embryonic lethality. However, meiotic recombination, targeted gene expression, whole transcriptome and ontology analyses as well as ToxCast data mining all indicate that these effects are partly achieved via mechanisms distinct from BPAs. These findings therefore raise new concerns about the safety of BPA alternatives and the risk associated with human exposure to mixtures. PMID:27472198

  17. Exposure to the BPA-Substitute Bisphenol S Causes Unique Alterations of Germline Function.

    PubMed

    Chen, Yichang; Shu, Le; Qiu, Zhiqun; Lee, Dong Yeon; Settle, Sara J; Que Hee, Shane; Telesca, Donatello; Yang, Xia; Allard, Patrick

    2016-07-01

    Concerns about the safety of Bisphenol A, a chemical found in plastics, receipts, food packaging and more, have led to its replacement with substitutes now found in a multitude of consumer products. However, several popular BPA-free alternatives, such as Bisphenol S, share a high degree of structural similarity with BPA, suggesting that these substitutes may disrupt similar developmental and reproductive pathways. We compared the effects of BPA and BPS on germline and reproductive functions using the genetic model system Caenorhabditis elegans. We found that, similarly to BPA, BPS caused severe reproductive defects including germline apoptosis and embryonic lethality. However, meiotic recombination, targeted gene expression, whole transcriptome and ontology analyses as well as ToxCast data mining all indicate that these effects are partly achieved via mechanisms distinct from BPAs. These findings therefore raise new concerns about the safety of BPA alternatives and the risk associated with human exposure to mixtures. PMID:27472198

  18. Estrogens in the wrong place at the wrong time: fetal BPA exposure and mammary cancer

    PubMed Central

    Paulose, Tessie; Speroni, Lucia; Sonnenschein, Carlos; Soto, Ana M

    2014-01-01

    Iatrogenic gestational exposure to diethylstilbestrol (DES) induced alterations of the genital tract and predisposed individuals to develop clear cell carcinoma of the vagina as well as breast cancer later in life. Gestational exposure of rodents to a related compound, the xenoestrogen bisphenol-A (BPA) increases the propensity to develop mammary cancer during adulthood, long after cessation of exposure. Exposure to BPA during gestation induces morphological alterations in both the stroma and the epithelium of the fetal mammary gland at 18 days of age. We postulate that the primary target of BPA is the fetal stroma, the only mammary tissue expressing estrogen receptors during fetal life. BPA would then alter the reciprocal stroma-epithelial interactions that mediate mammogenesis. In addition to this direct effect on the mammary gland, BPA is postulated to affect the hypothalamus and thus in turn affect the regulation of mammotropic hormones at puberty and beyond. PMID:25277313

  19. Project Mercury: Man-In-Space Program of the National Aeronautics and Space Administration. [Report of the Committee on Aeronautical and Space Sciences United States Senate

    NASA Technical Reports Server (NTRS)

    1959-01-01

    The purpose of this staff study, made at the request of the chairman, is to serve members of the Committee on Aeronautical and Space Sciences as a source of basic information on Project Mercury, the man-in-space program of the National Aeronautics and Space Administration. The study is largely derived from unclassified information released by the National Aeronautics and Space Administration and testimony concerning Project Mercury given during hearings before this committee. The program descriptions are based upon current program planning. Since this is a highly advanced research and development program, the project is obviously subject to changes that may result from future developments and accomplishments characteristic of such research activities. Certain information with respect to revised schedules, obtained on a classified basis by the committee during inspection trips, is necessarily omitted. The appendixes to the study include information that may prove helpful on various aspects of space flight and exploration. Included are unofficial comments and observations relating to Russia's manned space flight activities and also a complete chronology of all satellites, lunar probes, and space probes up to the present.

  20. ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  1. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    SciTech Connect

    Volkman, Jed; Sexton, Amy D.

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  2. BPA Directly Decreases GnRH Neuronal Activity via Noncanonical Pathway.

    PubMed

    Klenke, Ulrike; Constantin, Stephanie; Wray, Susan

    2016-05-01

    Peripheral feedback of gonadal estrogen to the hypothalamus is critical for reproduction. Bisphenol A (BPA), an environmental pollutant with estrogenic actions, can disrupt this feedback and lead to infertility in both humans and animals. GnRH neurons are essential for reproduction, serving as an important link between brain, pituitary, and gonads. Because GnRH neurons express several receptors that bind estrogen, they are potential targets for endocrine disruptors. However, to date, direct effects of BPA on GnRH neurons have not been shown. This study investigated the effects of BPA on GnRH neuronal activity using an explant model in which large numbers of primary GnRH neurons are maintained and express many of the receptors found in vivo. Because oscillations in intracellular calcium have been shown to correlate with electrical activity in GnRH neurons, calcium imaging was used to assay the effects of BPA. Exposure to 50μM BPA significantly decreased GnRH calcium activity. Blockage of γ-aminobutyric acid ergic and glutamatergic input did not abrogate the inhibitory BPA effect, suggesting direct regulation of GnRH neurons by BPA. In addition to estrogen receptor-β, single-cell RT-PCR analysis confirmed that GnRH neurons express G protein-coupled receptor 30 (G protein-coupled estrogen receptor 1) and estrogen-related receptor-γ, all potential targets for BPA. Perturbation studies of the signaling pathway revealed that the BPA-mediated inhibition of GnRH neuronal activity occurred independent of estrogen receptors, GPER, or estrogen-related receptor-γ, via a noncanonical pathway. These results provide the first evidence of a direct effect of BPA on GnRH neurons. PMID:26934298

  3. 2007 Wholesale Power Rate Adjustment Proceeding (WP-07) : Administrator's Final Record of Decision.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-07-01

    This Record of Decision (ROD) contains the decisions of the Bonneville Power Administration (BPA), based on the record compiled in this rate proceeding, with respect to the adoption of power rates for the three-year rate period commencing October 1, 2006, through September 30, 2009. This ''2007 Wholesale Power Rate Adjustment Proceeding'' is designed to establish replacement rate schedules and General Rate Schedule Provisions (GRSPs) for those that expire on September 30, 2006. This power rate case also establishes the General Transfer Agreement (GTA) Delivery Charge for the period of October 1, 2007, through September 30, 2009. BPA's Power Subscription Strategy and Record of Decision (Subscription Strategy), as well as other Agency processes, provide much of the policy context for this rate case and are described in Section 2. This ROD follows a full evidentiary hearing and briefing, including an Oral Argument before the BPA Administrator. Sections 3 through 18, including any appendices or attachments, present the issues raised by parties in this proceeding, the parties positions, BPA staff positions on the issues, BPA's evaluations of the positions, and the Administrator's decisions. Parties had the opportunity to file briefs on exceptions to the Draft ROD, before issuance of this Final Record of Decision.

  4. Antelope-Fossil Rebuild Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

  5. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

    SciTech Connect

    Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

  6. Project IMPACT Courseware Subsystem: Volume I: Innovative Procedures for Development and Administration. Technical Report 74-1.

    ERIC Educational Resources Information Center

    Hillelsohn, Michael J.

    Instructional design, instructional documentation, and instructional materials are used in the Project IMPACT computer assisted instruction (CAI) system. Separation of course content and logic in the system permits individualized training controlled in part by the student and in part by an instructional decision model. The entire instructional…

  7. Evaluation of Green Dot's Locke Transformation Project: From the Perspective of Teachers and Administrators. CRESST Report 824

    ERIC Educational Resources Information Center

    Herman, Joan L.; Wang, Jia; Ong, Christine; Straubhaar, Rolf; Schweig, Jon; Hsu, Vivian

    2013-01-01

    With funding from the Bill and Melinda Gates Foundation, CRESST researchers conducted a multi-year evaluation of a major school reform project at Alain Leroy Locke High School, historically one of California's lowest performing secondary schools. We found the one-year teacher retention rate at GDL in 2010-2011 was 79%; Green Dot Locke teachers,…

  8. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... Grapevine Canyon Wind Project was published in the Federal Register (77 FR 34041). After considering the... would generate up to 500 megawatts of electricity from wind turbine generators (WTGs). The proposed... wind park and transmission tie-line facilities. To implement the RPMs, an Avian and Bat Protection...

  9. American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  10. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  11. Migrant Education Administrative Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    Relating specifically to the North Carolina migrant education program's administrative responsibilities, this guide is designed to aid administrators in program management, monitoring project activities, project evaluation, self-assessment, determining needs for training and staff development, site-visit preparation, policy development, and…

  12. Design of Studies for Development of BPA Fish and Wildlife Mitigation Accounting Policy Phase II, Volume II, 1985-1988 Technical Report.

    SciTech Connect

    Kneese, Allen V.

    1988-08-01

    The incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative measures and their systemwide implications. The BPA anticipate this situation by launching a forward-looking research program aimed at providing methodological tools and data suitable for estimating the productivity and cost implications of mitigation alternatives in a timely manner with state-of-the-art accuracy. Resources for the Future (RFF) agreed at the request of the BPA to develop a research program which would provide an analytical system designed to assist the BPA Administrator and other interested and responsible parties in evaluating the ecological and economic aspects of alternative protection, enhancement, and mitigation measures. While this progression from an ecological understanding to cost-effectiveness analyses is straightforward in concept, the complexities of the Columbia River system make the development of analytical methods far from simple in practice. The Phase 2 final report outlines the technical issues involved in developing an analytical system and proposes a program of research to address these issues. The report is presented in the Summary Report (Volume 1), and the present volume which consists of three technical reports: Part I, Modeling the Salmon and Steelhead Fisheries of the Columbia River Basin; Part II, Models for Cost-Effectiveness Analysis; and Part III, Ocean Fisheries Harvest Management.

  13. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    SciTech Connect

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  14. Toxicogenomic analysis of placenta samples from mice exposed to different doses of BPA

    PubMed Central

    Tait, Sabrina; Tassinari, Roberta; Maranghi, Francesca; Mantovani, Alberto

    2015-01-01

    Bisphenol A (BPA), a widespread Endocrine Disrupter mainly used in food contact plastics, may induce adverse effects especially on susceptible lifestages, first of all pregnancy. The present study considered placental development as a potential target of BPA and investigated potential differences in the modes of action of two doses of BPA by a toxicogenomic approach. Pregnant CD-1 mice were administered with vehicle, 0.5 (BPA05) or 50 mg/kg (BPA50) body weight (bw)/die of BPA, from gestational day (GD) 1 to GD11. At GD12 dams were sacrificed and transcriptomic analysis was performed on placenta samples. Histological, histomorphometrical and immunohistochemical analyses were also performed to phenotypically anchor transcriptional changes associated with BPA exposure. The interpretation and description of the overall data are included in a manuscript under revision [1]. Here we describe the experimental design and the analysis performed on the gene expression data which are publicly available through the Gene Expression Omnibus (GEO) database with accession number GSE63852. PMID:26484192

  15. Probabilistic modeling of school meals for potential bisphenol A (BPA) exposure.

    PubMed

    Hartle, Jennifer C; Fox, Mary A; Lawrence, Robert S

    2016-05-01

    Many endocrine-disrupting chemicals (EDCs), including bisphenol A (BPA), are approved for use in food packaging, with unbound BPA migrating into the foods it contacts. Children, with their developing organ systems, are especially susceptible to hormone disruption, prompting this research to model the potential dose of BPA from school-provided meals. Probabilistic exposure models for school meals were informed by mixed methods. Exposure scenarios were based on United States school nutrition guidelines and included meals with varying levels of exposure potential from canned and packaged food. BPA exposure potentials were modeled with a range of 0.00049 μg/kg-BW/day for a middle school student with a low exposure breakfast and plate waste to 1.19 μg/kg-BW/day for an elementary school student eating lunch with high exposure potential. The modeled BPA doses from school meals are below the current US EPA Oral Reference Dose (RfD) of 50 μg/kg-BW/day. Recent research shows BPA animal toxicity thresholds at 2 μg/kg-BW/day. The single meal doses modeled in this research are at the same order of magnitude as the low-dose toxicity thresholds, illustrating the potential for school meals to expose children to chronic toxic levels of BPA. PMID:26395857

  16. Endocrine activity of alternatives to BPA found in thermal paper in Switzerland.

    PubMed

    Goldinger, Daniela M; Demierre, Anne-Laure; Zoller, Otmar; Rupp, Heinz; Reinhard, Hans; Magnin, Roxane; Becker, Thomas W; Bourqui-Pittet, Martine

    2015-04-01

    Alternatives to bisphenol A (BPA) are more and more used in thermal paper receipts. To get an overview of the situation in Switzerland, 124 thermal paper receipts were collected and analyzed. Whereas BPA was detected in most samples (n=100), some alternatives, namely bisphenol S (BPS), Pergafast® 201 and D-8 have been found in 4, 11 and 9 samples respectively. As no or few data on their endocrine activity are available, these chemicals and bisphenol F (BPF) were tested in vitro using the H295R steroidogenesis assay. 17β-Estradiol production was induced by BPA and BPF, whereas free testosterone production was inhibited by BPA and BPS. Both non-bisphenol substances did not show significant effects. The binding affinity to 16 proteins and the toxicological potential (TP) were further calculated in silico using VirtualToxLab™. TP values lay between 0.269 and 0.476 and the main target was the estrogen receptor β (84.4 nM to 1.33 μM). A substitution of BPA by BPF and BPS should be thus considered with caution, since they exhibit almost a similar endocrine activity as BPA. D-8 and Pergafast® 201 could be alternatives to replace BPA, however further analyses are needed to better characterize their effects on the hormonal system. PMID:25579646

  17. Community health workers' experiences and perspectives on mass drug administration for schistosomiasis control in western Kenya: the SCORE Project.

    PubMed

    Omedo, Martin O; Matey, Elizabeth J; Awiti, Alphonce; Ogutu, Michael; Alaii, Jane; Karanja, Diana M S; Montgomery, Susan P; Secor, W Evan; Mwinzi, Pauline N M

    2012-12-01

    Abstract. The Schistosomiasis Consortium for Operational Research and Evaluation (SCORE) includes communitywide treatment in areas with ≥ 25% prevalence of schistosomiasis along the shores of Lake Victoria using community health workers (CHWs). The CHWs are key drivers in community-owned mass drug administration (MDA) intervention programs. We explored their experiences and perceptions after initial MDA participation. Unstructured open-ended group discussions were conducted after completion of MDA activities. Narratives were obtained from CHWs using a digital audio recorder during the group discussion, transcribed verbatim and translated into English where applicable. Thematic decomposition of data was done using ATLAS.t.i. software. From the perspective of the CHWs, factors influencing MDA compliance included drug side effects, food supply stability, and conspiracy theories about the "real" purpose of treatment. The interest of CHWs to serve as community drug distributors stemmed from both intrinsic and extrinsic factors. Feedback from CHWs can promote more effective MDA in rural Kenyan communities. PMID:23091190

  18. Quantitative determination of free and total bisphenol A in human urine using labeled BPA glucuronide and isotope dilution mass spectrometry.

    PubMed

    Kubwabo, Cariton; Kosarac, Ivana; Lalonde, Kaela; Foster, Warren G

    2014-07-01

    Bisphenol A (BPA) is a widely used industrial chemical in the manufacturing of polycarbonate plastic bottles, food and beverage can linings, thermal receipts, and dental sealants. Animal and human studies suggest that BPA may disrupt normal hormonal function and hence, potentially, have negative effects on the human health. While total BPA is frequently reported, it is recognized that free BPA is the biologically active form and is rarely reported in the literature. The objective of this study was to develop a sensitive and improved method for the measurement of free and total BPA in human urine. Use of a labeled conjugated BPA (bisphenol A-d6 β-D-glucuronide) allowed for the optimization of the enzymatic reaction and permitted an accurate determination of the conjugated BPA concentration in urine samples. In addition, a (13)C12-BPA internal standard was used to account for the analytical recoveries and performance of the isotope dilution method. Solid-phase extraction (SPE) combined with derivatization and analysis using a triple quadrupole GC-EI/MS/MS system achieved very low method detection limit of 0.027 ng/mL. BPA concentrations were measured in urine samples collected during the second and third trimesters of pregnancy in 36 Canadian women. Total maternal BPA concentrations in urine samples ranged from not detected to 9.40 ng/mL (median, 1.21 ng/mL), and free BPA concentrations ranged from not detected to 0.950 ng/mL (median, 0.185 ng/mL). Eighty-six percent of the women had detectable levels of conjugated BPA, whereas only 22 % had detectable levels of free BPA in their urine. BPA levels measured in this study agreed well with data reported internationally. PMID:24817354

  19. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  20. Yakima Fisheries Project : Revised Draft Environmental Impact Statement, Summary.

    SciTech Connect

    Confederated Tribes and Bands of the Yakama Nation, Washington; Washington . Dept. of Fish and Wildlife.

    1995-05-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and enhancement activities in the Yakima River Basin. The State of Washington and the Yakima Indian Nation would jointly direct the project. The Yakima River system is a promising location for mitigation and enhancement to compensate for stock losses from development and operation of hydroelectric projects elsewhere in the Columbia Basin. The YFP would help determine the role that supplementation might play in increasing natural production of anadromous salmonids throughout the Columbia Basin. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities. The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two alternatives have been proposed: Alternative 1 would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative 2 (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin. (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  1. Migrant Education Administrative Handbook.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Bureau of Migrant Education.

    Intended to provide information pertaining to the administration of migrant education projects in Louisiana, the handbook is divided into two sections: basic guidelines for program operations and support services--nursing. Section I covers the Federal and State migrant program, local migrant projects, project personnel and staff development, and…

  2. Biodistribution of the boron carriers boronophenylalanine (BPA) and/or decahydrodecaborate (GB-10) for Boron Neutron Capture Therapy (BNCT) in an experimental model of lung metastases

    SciTech Connect

    D.W. Nigg; Various Others

    2014-06-01

    BNCT was proposed for the treatment of diffuse, non-resectable tumors in the lung. We performed boron biodistribution studies with 5 administration protocols employing the boron carriers BPA and/or GB-10 in an experimental model of disseminated lung metastases in rats. All 5 protocols were non-toxic and showed preferential tumor boron uptake versus lung. Absolute tumor boron concentration values were therapeutically useful (25–76 ppm) for 3 protocols. Dosimetric calculations indicate that BNCT at RA-3 would be potentially therapeutic without exceeding radiotolerance in the lung.

  3. Newberry Geothermal Pilot Project : Final Environmental Impact Statement.

    SciTech Connect

    US Forest Service; US Bureau of Land Management; US Bonneville Power Administration

    1994-09-01

    BPA has decided to acquire 20 average megawatts (aMW) of electrical power from a privately-owned geothermal power plant on the west flank of Newberry Volcano in Deschutes County, Oregon. The Newberry Project will generate 30 aMW and will be developed, owned, and operated by CE Newberry, Inc. of Portland, Oregon. In addition, BPA has decided to grant billing credits to EWEB for 10 aMW of electrical power and to provide wheeling services to EWEB for the transmission of this power to their system. BPA expects the Newberry Project to be in commercial operation by November 1997. BPA has statutory responsibilities to supply electrical power to its utility industrial and other customers in the Pacific Northwest. The Newberry Project will be used to meet the electrical power supply obligations of these customers. The Newberry Project will also demonstrate the availability of geothermal power to meet power supply needs in the Pacific Northwest and is expected to be the first commercial geothermal plant in the region. The Newberry Project was selected under the BPA Geothermal Pilot Project Program. The goal of the Program is to initiate development of the Pacific Northwest`s large, but essentially untapped, geothermal resources, and to confirm the availability of this resource to meet the energy needs of the region. The primary underlying objective of this Program is to assure the supply of alternative sources of electrical power to help meet growing regional power demands and needs.

  4. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    SciTech Connect

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative impact of this project on wildlife when combined with

  5. Effects of riboflavin photosensitization on the degradation of bisphenol A (BPA) in model and real-food systems.

    PubMed

    Ha, Dong-Oh; Jeong, Min Kyu; Park, Chan Uk; Park, Min Hee; Chang, Pahn-Shick; Lee, Jae Hwan

    2009-06-01

    Effects of riboflavin photosensitizations on the stability of bisphenol A (BPA), a well-known endocrine disrupting chemical, were studied in model and real-food systems by high-performance liquid chromatography (HPLC). Concentration of BPA was significantly decreased under light exposure (P < 0.05) as the concentration of riboflavin increased while those without riboflavin under light or those with riboflavin in the dark did not change significantly (P > 0.05). Addition of 50, 100, and 200 microM sodium azide significantly increased the stability of BPA in riboflavin photosensitization with concentration dependent manner (P < 0.05), implying that a singlet oxygen or type II pathway played a role in the photodegradation of BPA. Stability of BPA in riboflavin was significantly increased in the presence of high concentration of tert-butanol, a hydroxyl radical quencher, under light storage for 80 min, indicating hydroxyl radicals were involved and contributed to the degradation of BPA, at least in part. Availability of riboflavin photosensitization on the photodegradation of BPA was tested in 2 canned tea beverages with different phenolic contents. BPA was more stable in the beverage sample with higher total phenolic contents and free radical scavenging ability. The photodegradation of BPA in riboflavin photosensitization can be an efficient way to decrease the concentration of BPA from environmental or food systems. PMID:19646031

  6. Bonneville Power Administration 1993 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  7. Bisphenol A (BPA) and its source in foods in Japanese markets.

    PubMed

    Sajiki, J; Miyamoto, F; Fukata, H; Mori, C; Yonekubo, J; Hayakawa, K

    2007-01-01

    The determination of bisphenol A (BPA) and/or bisphenol A diglycidyl ether (BADGE) in foods sold in Japanese markets and in water leached from six epoxy resin cans with similar diameters was carried out using high-performance liquid chromatography (HPLC) with electrochemical detection (LC/ECD), LC-mass spectrometric detection (LC/MS) and LC-tandem mass spectrometric detection (LC/MS/MS). BPA concentrations were 0-842 ng g(-1) for 48 canned foods, 0-14 ng g(-1) for 23 foods in plastic containers, and 0-1 ng g(-1) for 16 foods in paper containers. No BADGE was detected in three canned foods. There was no difference in leaching concentrations of BPA into glycine buffers at pHs 8 and 11, and water. The amounts of BPA leached into water from six epoxy resin cans held at 121 degrees C for 20 min were almost the same as the cans' contents and were much higher than the amounts leached from cans held at or below 80 degrees C for 60 min. The amount leached depended on the type of can, but not on the amount of BADGE leached from the cans. Considerably more BPA than BADGE leached to water from six cans. Two cans whose contents had high concentrations of BPA showed no BADGE leaching even at 121 degrees C, suggesting the different kinds of epoxy resin can linings from others. The results imply that the main source of human exposure to BPA is food from cans with linings that contain high percentages of BPA as an additive or an unforeseen contaminant. PMID:17164221

  8. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    SciTech Connect

    N /A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with the

  9. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    SciTech Connect

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  10. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect

    Ashley, Paul

    2004-01-01

    subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).

  11. Bisphenol A (BPA) in food contact materials - new scientific opinion from EFSA regarding public health risk.

    PubMed

    Ćwiek-Ludwicka, Kazimiera

    2015-01-01

    The wide use of bisphenol A (BPA) as a monomer in plastics manufacture or epoxy resins intended for food contact materials (FCM) has triggered numerous concerns due to toxicological findings indicating possible endocrine disrupting properties. This article traces the evolution of the scientific opinions since 1986 when the Tolerable Daily Intake (TDI) for BPA and its specific migration limit (SML) from plastic FCM into food were proposed for the first time by the Scientific Committee for Food (SCF). Resent extensive scientific studies concerning refined data on toxicity and exposure to BPA from food and non-food sources (eg. dust, cosmetics, thermal paper), including the most vulnerable groups of population, allowed the European Food Safety Authority (EFSA) to reduce the TDI of BPA from previously 50 µg/kg bw/day to now 4 µg/kg bw/day. EFSA's latest scientific opinion published in 2015 concludes that basing on the current estimations of total exposure to BPA from dietary and non-dietary sources for infants, children and adolescents is below the temporary TDI of 4 μg/kg bw/day. EFSA has also underlined that BPA poses no health risk at the estimated exposure levels of any population age group, including unborn children and the elderly. However, EFSA has indicated that some data on exposure and toxicological effects still require clarifications. PMID:26656411

  12. Simultaneous adsorption of Cd²⁺ and BPA on amphoteric surfactant activated montmorillonite.

    PubMed

    Liu, Chongmin; Wu, Pingxiao; Zhu, Yajie; Tran, Lytuong

    2016-02-01

    The study mainly investigated the simultaneous adsorption of bisphenol A (BPA) and Cd(2+) from aqueous solution on octadecane-betaine modified montmorillonite (BS-Mt). The characteristics of the obtained materials were analyzed by X-ray diffraction (XRD), Fourier-transform infrared (FTIR), Specific surface area (BET) and Scanning electron microscopy/Energy disperse spectroscopy (SEM/EDS), confirming that BS-18 was successfully introduced into Mt. Also, factors including initial solution pH, initial Cd(2+)/BPA concentration, contact time and adsorbent dosage on the adsorption processes were shown to be crucial for Cd(2+) adsorption, whereas had negligible effects on BPA adsorption. In this study, we found that pseudo-second-order model fitted well with the adsorption kinetic studies for both Cd(2+) and BPA with an equilibrium time of 24 h. The Cd(2+) and BPA adsorption isotherm could be well described by Freundlich model and Langmuir model, respectively. On the basis of kinetic models, the maximum adsorption capacity of Cd(2+) in aqueous solution was slightly enhanced after modification, indicating that Cd(2+) adsorption on BS-Mt was mainly attributed to direct electrostatic attraction and the chelate reaction, while the dramatic enhancement of maximum adsorption capacity for BPA was due to the hydrophobic interaction. PMID:26451652

  13. Inspection of surveillance activities and administrative leave policy at Bonneville Power Administration, Portland, Oregon

    SciTech Connect

    Not Available

    1994-04-01

    The authors conducted an inspection of surveillance activities and administrative leave policy at the Bonneville Power Administration, Portland, Oregon. The purpose of their inspection was to determine if a covert video surveillance operation conducted at Bonneville Power Administration was consistent with Department of Energy policies and procedures and other applicable regulations and procedures, and to determine if administrative leave policies and procedures used at Bonneville Power Administration in a specific instance were consistent with Department of Energy requirements and the Code of Federal Regulations. This inspection focused on a specific incident that occurred in 1989 on the 5th floor of the BPA Headquarters Building located in Portland, Oregon. The incident involved the soiling of an employee`s personal property with what appeared to be urine.

  14. Riparian Planting Projects Completed within Asotin Creek Watershed : 2000-2002 Asotin Creek Riparian Final Report of Accomplishments.

    SciTech Connect

    Johnson, B. J.

    2002-01-01

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for threatened and endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for threatened salmonids since 1994. The Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00 teamed BPA and the Governor's Salmon Recovery Funding to plant

  15. Developmental programming: Prenatal BPA treatment disrupts timing of LH surge and ovarian follicular wave dynamics in adult sheep

    SciTech Connect

    Veiga-Lopez, A.; Beckett, E.M.; Abi Salloum, B.; Ye, W.; Padmanabhan, V.

    2014-09-01

    Developmental exposure to BPA adversely affects reproductive function. In sheep, prenatal BPA treatment induces reproductive neuroendocrine defects, manifested as LH excess and dampened LH surge and perturbs early ovarian gene expression. In this study we hypothesized that prenatal BPA treatment will also disrupt ovarian follicular dynamics. Pregnant sheep were treated from days 30 to 90 of gestation with 3 different BPA doses (0.05, 0.5, or 5 mg/kg BW/day). All female offspring were estrus synchronized and transrectal ultrasonography was performed daily for 22 days to monitor ovarian follicular and corpora lutea dynamics. Blood samples were collected to assess preovulatory hormonal changes and luteal progesterone dynamics. Statistical analysis revealed that the time interval between the estradiol rise and the preovulatory LH surge was shortened in the BPA-treated females. None of the three BPA doses had an effect on corpora lutea, progestogenic cycles, and mean number or duration of ovulatory and non-ovulatory follicles. However, differences in follicular count trajectories were evident in all three follicular size classes (2–3 mm, 4–5 mm, and ≥ 6 mm) of prenatal BPA-treated animals compared to controls. Number of follicular waves tended also to be more variable in the prenatal BPA-treated groups ranging from 2 to 5 follicular waves per cycle, while this was restricted to 3 to 4 waves in control females. These changes in ovarian follicular dynamics coupled with defects in time interval between estradiol rise and preovulatory LH release are likely to lead to subfertility in prenatal BPA-treated females. - Highlights: • Prenatal BPA shortens interval between estradiol rise and preovulatory LH surge. • Prenatal BPA affects follicular count trajectory and follicular wave occurrence. • Prenatal BPA does not affect ovulatory rate and progesterone dynamics.

  16. Effects of developmental exposure to bisphenol A on spatial navigational learning and memory in rats: A CLARITY-BPA study.

    PubMed

    Johnson, Sarah A; Javurek, Angela B; Painter, Michele S; Ellersieck, Mark R; Welsh, Thomas H; Camacho, Luísa; Lewis, Sherry M; Vanlandingham, Michelle M; Ferguson, Sherry A; Rosenfeld, Cheryl S

    2016-04-01

    Bisphenol A (BPA) is a ubiquitous industrial chemical used in the production of a wide variety of items. Previous studies suggest BPA exposure may result in neuro-disruptive effects; however, data are inconsistent across animal and human studies. As part of the Consortium Linking Academic and Regulatory Insights on BPA Toxicity (CLARITY-BPA), we sought to determine whether female and male rats developmentally exposed to BPA demonstrated later spatial navigational learning and memory deficits. Pregnant NCTR Sprague-Dawley rats were orally dosed from gestational day 6 to parturition, and offspring were directly orally dosed until weaning (postnatal day 21). Treatment groups included a vehicle control, three BPA doses (2.5μg/kg body weight (bw)/day-[2.5], 25μg/kg bw/day-[25], and 2500μg/kg bw/day-[2500]) and a 0.5μg/kg/day ethinyl estradiol (EE)-reference estrogen dose. At adulthood, 1/sex/litter was tested for seven days in the Barnes maze. The 2500 BPA group sniffed more incorrect holes on day 7 than those in the control, 2.5 BPA, and EE groups. The 2500 BPA females were less likely than control females to locate the escape box in the allotted time (p value=0.04). Although 2.5 BPA females exhibited a prolonged latency, the effect did not reach significance (p value=0.06), whereas 2.5 BPA males showed improved latency compared to control males (p value=0.04), although the significance of this result is uncertain. No differences in serum testosterone concentration were detected in any male or female treatment groups. Current findings suggest developmental exposure of rats to BPA may disrupt aspects of spatial navigational learning and memory. PMID:26436835

  17. Effect of BPA on the germination, root development, seedling growth and leaf differentiation under different light conditions in Arabidopsis thaliana.

    PubMed

    Pan, Wen-Juan; Xiong, Can; Wua, Qiu-Ping; Liu, Jin-Xia; Liao, Hong-Mei; Chen, Wei; Liu, Yong-Sheng; Zheng, Lei

    2013-11-01

    Bisphenol A (BPA) is a well-known environmental toxic substance, which exerts unfavorable effects through endocrine disruptor (ER)-dependent and ER-independent mechanisms to threaten ecological systems seriously. BPA may also interact with other environmental factors, such as light and heavy metals, to have a synergetic effect in plants. However, there is little data concerning the toxic effect of BPA on the primary producers-plants and its possible interaction with light-dependent response. Here, the effects of BPA on germination, fresh weight, tap root length, and leaf differentiation were studied in Arabidopsis thaliana under different parts of light spectrum (dark, red, yellow, green, blue, and white light). Our results showed that low-dose BPA (1.0, 5.0 µM) caused an increase in the fresh weight, the tap root length and the lateral root formation of A. thaliana seedlings, while high-dose BPA (10.0, 25.0 µM) show an inhibition effect in a dose-dependent manner. Unlike karrikins, the effects of BPA on germination fresh weight and tap roots length under various light conditions are similar, which imply that BPA has no notable role in priming light response in germination and early seedling growth in A. thaliana. Meanwhile, BPA exposure influences the differentiation of A. thaliana leaf blade significantly in a light-dependent manner with little to no effect in dark and clear effect under red illumination. PMID:24206833

  18. Bisphenol A (BPA) Found in Humans and Water in Three Geographic Regions with Distinctly Different Levels of Economic Development

    PubMed Central

    Karalius, Vytas P.; Harbison, Justin E.; Plange-Rhule, Jacob; van Breemen, Richard B.; Li, Guannan; Huang, Ke; Durazo-Arvizu, Ramon A.; Mora, Nallely; Dugas, Lara R.; Vail, Lane; Tuchman, Nancy C.; Forrester, Terrence; Luke, Amy

    2014-01-01

    The suspected endocrine disruptor bisphenol A (BPA) is associated with the manufacture, distribution, and use of epoxy resins and polycarbonate plastics; thus, studies of this compound have focused primarily on urban areas in developed countries. This small study investigating urinary BPA of 109 people was conducted in the urban United States, urban Jamaica, and rural Ghana. Additionally, local drinking and surface water samples were collected and analyzed from areas near study participants. Levels of BPA in both urine and water were comparable among all three sites. Thus, future studies of BPA should consider expanding investigations to rural areas not typically associated with the compound. PMID:24453495

  19. The Genotoxic and Cytotoxic Effects of Bisphenol-A (BPA) in MCF-7 Cell Line and Amniocytes

    PubMed Central

    Aghajanpour-Mir, Seyed Mohsen; Zabihi, Ebrahim; Akhavan-Niaki, Haleh; Keyhani, Elahe; Bagherizadeh, Iman; Biglari, Sajjad; Behjati, Farkhondeh

    2016-01-01

    Bisphenol-A (BPA) is an industrial xenoestrogen used widely in our living environment. Recently, several studies suggested that BPA has destructive effects on DNA and chromosomes in normal body cells via estrogen receptors (ER). Therefore, BPA could be considered as an important mediator in many diseases such as cancer. However, there are still many controversial issues which need clarification. In this study, we investigated the BPA-induced chromosomal damages in MCF-7 cell line, ER-positive and negative amniocyte cells. Cytotoxicity and genotoxicity effects of BPA were also compared between these three cell groups. Expression of estrogen receptors was determined using immunocytochemistry technique. The cell cytotoxicity of BPA was measured by MTT assay. Classic cytogenetic technique was carried out for the investigation of chromosome damage. BPA, in addition to cytotoxicity, had remarkable genotoxicity at concentrations close to the traceable levels in tissues or biological fluids. Although some differences were observed in the amount of damages between ER-positive and negative fetal cells, interestingly, these differences were not significant. The present study showed that BPA could lead to chromosomal aberrations in both ER-dependent and independent pathways at some concentrations or in cell types yet not reported. Also, BPA could probably be considered as a facilitator for some predisposed cells to be cancerous by raising the chromosome instability levels. Finally, estrogen receptor seems to have a different role in cytotoxicity and genotoxicity effects. PMID:27386435

  20. The use of Health Care Financing Administration data for the development of a quality improvement project on the treatment of anemia.

    PubMed

    Eggers, P W; Greer, J; Jencks, S

    1994-08-01

    The Health Care Financing Administration maintains a wide array of data systems that are essential to the functioning of the Medicare program. These data, collected and maintained for the purposes of ensuring entitlements and payment for services, also can be used to monitor programmatic changes and to define potential problem areas. The end-stage renal disease (ESRD) Program Management and Medical Information System (PMMIS) is a subset of the larger Medicare statistical system. It is a historic record of all Medicare ESRD beneficiaries dating back to 1978. Basic Medicare enrollment information on ESRD beneficiaries is enhanced with the addition of information on the cause of renal failure, type of dialysis therapy, transplantation history, and cause of death. The ESRD PMMIS has been put to a number of uses in the past decade or so, ranging from basic descriptive epidemiology to analyses of mortality rates to assessments of programmatic issues such as the composite rate and dialyzer reuse. Because of the limited clinical detail in the PMMIS, there are many specific questions that cannot be adequately addressed. With approval of the Food and Drug Administration and Medicare coverage of erythropoietin, a erythropoietin monitoring system was developed to assess utilization trends of this anemia control drug. Within a few months it became evident that dosing levels for erythropoietin were much lower than expected from the clinical trials. Following a change in the payment method from a fixed amount to one based on dose level, dosing has increased markedly. However, hematocrit levels still remain below optimal levels. This lack of hematocrit response has led the Health Care Financing Administration, in concert with the renal community, to target anemia control as a potential health care quality improvement project. This paper presents an example of the type of data presentation that can be derived from the current PMMIS. The Health Standards and Quality Bureau has made

  1. Discretionary Grants Administration Manual.

    ERIC Educational Resources Information Center

    Office of Human Development Services (DHHS), Washington, DC.

    This manual sets forth applicable administrative policies and procedures to recipients of discretionary project grants or cooperative agreements awarded by program offices in the Office of Human Development Services (HDS). It is intended to serve as a basic reference for project directors and business officers of recipient organizations who are…

  2. WindSENSE Project Summary: FY2009-2011

    SciTech Connect

    Kamath, C

    2011-09-25

    Renewable resources, such as wind and solar, are providing an increasingly larger percentage of our energy needs. To successfully integrate these intermittent resources into the power grid while maintaining its reliability, we need to better understand the characteristics and predictability of the variability associated with these power generation resources. WindSENSE, a three year project at Lawrence Livermore National Laboratory, considered the problem of scheduling wind energy on the grid from the viewpoint of the control room operator. Our interviews with operators at Bonneville Power Administration (BPA), Southern California Edison (SCE), and California Independent System Operator (CaISO), indicated several challenges to integrating wind power generation into the grid. As the percentage of installed wind power has increased, the variable nature of the generation has become a problem. For example, in the Bonneville Power Administration (BPA) balancing area, the installed wind capacity has increased from 700 MW in 2006-2007 to over 1300 MW in 2008 and more than 2600 MW in 2009. To determine the amount of energy to schedule for the hours ahead, operators typically use 0-6 hour ahead forecasts, along with the actual generation in the previous hours and days. These forecasts are obtained from numerical weather prediction (NWP) simulations or based on recent trends in wind speed in the vicinity of the wind farms. However, as the wind speed can be difficult to predict, especially in a region with complex terrain, the forecasts can be inaccurate. Complicating matters are ramp events, where the generation suddenly increases or decreases by a large amount in a short time (Figure 1, right panel). These events are challenging to predict, and given their short duration, make it difficult to keep the load and the generation balanced. Our conversations with BPA, SCE, and CaISO indicated that control room operators would like (1) more accurate wind power generation forecasts

  3. Conjugated Bisphenol A (BPA) in maternal serum in relation to miscarriage risk

    PubMed Central

    Lathi, Ruth B.; Liebert, Cara A.; Brookfield, Kathleen F.; Taylor, Julia A.; Saal, Frederick S. vom; Fujimoto, Victor Y.; Baker, Valerie L.

    2014-01-01

    Objective To examine the relationship between maternal serum Bisphenol-A (BPA) concentration at the time of the missed period and miscarriage risk. Design Retrospective cohort of prospectively collected serum samples. Setting Academic fertility center. Patients Women presenting for early pregnancy monitoring with singleton pregnancies. Intervention Stored serum samples from 4-5 weeks gestation were analyzed for conjugated serum BPA concentrations. Main Outcomes Live birth, miscarriage, and chromosome content of miscarriage. Results Of the 115 included subjects, there were 47 live births and 68 clinical miscarriages (46 aneuploid and 22 euploid). Median conjugated BPA concentrations were higher in women with miscarriages than those with live births (0.101 vs 0.075 ng/ml). Women with the highest quartile of conjugated BPA had an increased relative risk of miscarriage (1.83, 95% CI 1.14-2.96) compared to women in the lowest quartile. We found a similar increase risk for both euploid and aneuploid miscarriages. Conclusions Maternal conjugated BPA was associated with higher risk of aneuploid and euploid miscarriage in this cohort. The impact of reducing individual exposures on future pregnancy outcomes deserves further study. PMID:24746738

  4. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  5. Higher Education Administrators' Perceptions of the Academic Quality Improvement Project as Compared to the Program to Evaluate and Advance Quality within the North Central Association of Colleges and Schools

    ERIC Educational Resources Information Center

    McDonough, Jennifer Nobles

    2012-01-01

    The purpose of this study was to examine higher education administrators' perceptions of the effectiveness of the Academic Quality Improvement Project (AQIP) as compared to the Program to Evaluate and Advance Quality (PEAQ) within the North Central Association of Colleges and Schools (NCA). The Higher Learning Commission (HLC), a commission…

  6. Assessment of Bisphenol A (BPA) neurotoxicity in vitro with mouse embryonic stem cells.

    PubMed

    Yin, Nuoya; Yao, Xinglei; Qin, Zhanfen; Wang, Yuan-Liang; Faiola, Francesco

    2015-10-01

    The adverse effects of environmental pollution on our well-being have been intensively studied with many in vitro and in vivo systems. In our group, we focus on stem cell toxicology due to the multitude of embryonic stem cell (ESC) properties which can be exerted in toxicity assays. In fact, ESCs can differentiate in culture to mimic embryonic development in vivo, or specifically to virtually any kind of somatic cells. Here, we used the toxicant Bisphenol A (BPA), a chemical known as a hazard to infants and children, and showed that our stem cell toxicology system was able to efficiently recapitulate most of the toxic effects of BPA previously detected by in vitro system or animal tests. More precisely, we demonstrated that BPA affected the proper specification of germ layers during our in vitro mimicking of the embryonic development, as well as the establishment of neural ectoderm and neural progenitor cells. PMID:26456621

  7. 78 FR 9771 - Federal Highway Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois and Indiana AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on..., Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone: (217)...

  8. Distribution of BPA and metabolic assessment in glioblastoma patients during BNCT treatment: a microdialysis study.

    PubMed

    Bergenheim, A Tommy; Capala, Jacek; Roslin, Michael; Henriksson, Roger

    2005-02-01

    Boron neutron capture therapy (BNCT) is dependent on the selective accumulation of boron-10 in tumour cells. To maximise the radiation effect, the neutrons should be delivered when the ratio between the boron concentration in tumour cells to that in normal tissues reaches maximum. However, the pharmacokinetics of p-boronophenylalanine (BPA) and other boron delivery agents are only partly known. We used microdialysis to investigate the extracellular in vivo kinetics of boron in three intracerebral compartments -- solid tumour, brain adjacent to tumour (BAT), and the normal brain, as well as the subcutaneous tissue before, during, and after BNCT treatment. The findings were compared to the pharmacokinetics of BPA in the blood. We also measured the glucose metabolism and the levels of glutamate and glycerol in those compartments. Four patients were studied, two patients underwent surgical tumour resection and in two a stereotactic biopsy was performed. The patients were given BPA (900 mg/kg body weight) by a 6-h infusion. The infusion was completed approximately 2-3 h before neutron irradiation. In tumour tissue the extracellular concentration of BPA followed that of blood with a maximal concentration of 31.2 ppm and a maximal ratio vs. blood of 1.07. In BAT, the maximal concentration of BPA was 18.0 ppm with the peak level delayed for 4-6 h compared to the peak in blood with a maximal ratio of 1.2. Maximal blood concentration found was 41.0 ppm. The uptake of BPA in the normal brain was considerably lower than that in the blood and tumour tissue. No change in glucose metabolism was observed. The extracellular level of glycerol was increased after treatment in tumour tissue but not in normal brain suggesting a selective acute cytotoxic effect of BNCT on tumour cells. PMID:15735919

  9. Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report

    SciTech Connect

    Lu, Shuai; Makarov, Yuri V.

    2009-04-01

    This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on February 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.

  10. Administrative Synergy

    ERIC Educational Resources Information Center

    Hewitt, Kimberly Kappler; Weckstein, Daniel K.

    2012-01-01

    One of the biggest obstacles to overcome in creating and sustaining an administrative professional learning community (PLC) is time. Administrators are constantly deluged by the tyranny of the urgent. It is a Herculean task to carve out time for PLCs, but it is imperative to do so. In this article, the authors describe how an administrative PLC…

  11. Comparison of the effects of BPA and BPAF on oocyte spindle assembly and polar body release in mice.

    PubMed

    Nakano, Kei; Nishio, Manami; Kobayashi, Norio; Hiradate, Yuuki; Hoshino, Yumi; Sato, Eimei; Tanemura, Kentaro

    2016-04-01

    Bisphenol AF (BPAF), a homolog of bisphenol A (BPA), is a widely used environmental chemical that has adverse effects on reproduction. The aim of this study was to analyse the effects of BPA and BPAF exposure on oocyte maturation in vitro. Oocytes were cultured in the presence of BPA or BPAF (2, 20, 50 or 100 μg/ml) for 18 h. At concentrations of 50 and 100 μg/ml, BPA and BPAF inhibited oocyte maturation, with BPAF treatment causing a sharp decrease in the number of oocytes reaching maturity. Oocytes were exposed to BPA or BPAF at 2 μg/ml and cultured for different durations (6, 9, 12, 15 or 18 h). Both BPAF and BPA caused a cell cycle delay under these conditions. Oocytes cultured in the presence of BPA or BPAF (50 μg/ml) for 21 h were tested for the localization of α-tubulin and MAD2 using immunofluorescence. High concentrations of BPAF induced cell cycle arrest through the activation of the spindle assembly checkpoint. After 12 h of culture in BPAF (50 μg/ml), oocytes were transferred to control medium for 9 h. Only 63.3% oocytes treated in this manner progressed to metaphase II (MII). Oocytes exposed to high doses of BPA experienced a cell cycle delay, but managed to progress to MII when the culture period was prolonged. In addition, MAD2 was localized in the cytoplasm of these oocytes. In conclusion, both BPAF and BPA exposure affected oocyte maturation, however BPAF and BPA have differential effects on SAC activity. PMID:25925194

  12. West Foster Creek Expansion Project 2007 HEP Report.

    SciTech Connect

    Ashley, Paul R.

    2008-02-01

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  13. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect

    Graves, Ron

    2004-02-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  14. Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01)

    SciTech Connect

    N /A

    2003-10-02

    The Bonneville Power Administration prepared an Environmental Assessment (DOE/EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a resident trout hatchery on the Colville Indian Reservation to partially mitigate for anadromours and other fish losses resulting from the construction and operation of the Chief Joseph Dam and Grand Coulee Dam hydroelectric projects. Since the hatchery was constructed, ongoing Operation and Maintenance (O&M) and Monitoring and Evaluation (M&E) activities have been funded by BPA. The O&M and M&E activities examined in the EA were very general in nature due to the fact the project was in the conceptual stage. Since that time the hatchery has refined the need for specific O&M and M&E activities, proposed for fiscal year 2004, (funding for projects runs from October 2003 to September 2004). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze the environmental impacts that would result from the specific O&M and M&E activities proposed for fiscal year 2004.

  15. Classification of PS15bpa as a post maximum Type II supernova

    NASA Astrophysics Data System (ADS)

    Piascik, A. S.; Steele, I. A.

    2015-08-01

    We conducted a spectroscopic observation of transient PS15bpa at 2015-08-06T22:11:16 UT. This transient was identified by the Pan-STARRS Survey for Transients (PSST) in ATel #7876 with a discovery date 2015-08-01.

  16. Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task 2 Report

    SciTech Connect

    Lu, Shuai; Makarov, Yuri V.; McKinstry, Craig A.; Brothers, Alan J.; Jin, Shuangshuang

    2009-09-18

    Task report detailing low probability tail event analysis and mitigation in BPA control area. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, causing the imbalance between generation and load to become very significant.

  17. Color Shift Investigations for LED Secondary Optical Designs: Comparison between BPA-PC and PMMA

    NASA Astrophysics Data System (ADS)

    Lu, Guangjun; Yazdan Mehr, M.; van Driel, W. D.; Fan, Xuejun; Fan, Jiajie; Jansen, K. M. B.; Zhang, G. Q.

    2015-07-01

    Recently, color shift of LED-based lighting products has attracted much attention due to its increasing impact on the field application. However, significant research investigations on the color shift mechanisms are not publically available especially for important transmission materials used for secondary optical design. In this paper, broadly used such commercial materials (BPA-PC and PMMA) are experimentally investigated on the color shift effects during aging. Besides this, color shift mechanisms of degradation of transmittance are also studied. Results revealed: (1) Inconsistent degradation of wavelength-dependent transmittance induces the decrease of the blue/yellow light intensity ratio and thus gives rise to the color shift toward the yellow field, which is the color shift mechanism of BPA-PC; (2) Even for the non-aged BPA-PC, the transmittance varies with wavelength in the visible light field due to the chemistry of the material, which caused the change of intensify ratio of blue light to yellow light in the SPD, leading to color change in perception; (3) Oxidation plays a key role in the degradation of transmittance at around the peak wavelength of the blue light field, which is in correlation with the discoloration of thermally-aged BPA-PC materials. By contrast, for the PMMA specimen aged up to 3000 h, oxidation was neither occurred at 85 °C, nor with additional exposure to blue light, nor even with additional humidity of 85%RH.

  18. BPA-Induced Deregulation Of Epigenetic Patterns: Effects On Female Zebrafish Reproduction

    PubMed Central

    Santangeli, Stefania; Maradonna, Francesca; Gioacchini, Giorgia; Cobellis, Gilda; Piccinetti, Chiara Carla; Dalla Valle, Luisa; Carnevali, Oliana

    2016-01-01

    Bisphenol A (BPA) is one of the commonest Endocrine Disruptor Compounds worldwide. It interferes with vertebrate reproduction, possibly by inducing deregulation of epigenetic mechanisms. To determine its effects on female reproductive physiology and investigate whether changes in the expression levels of genes related to reproduction are caused by histone modifications, BPA concentrations consistent with environmental exposure were administered to zebrafish for three weeks. Effects on oocyte growth and maturation, autophagy and apoptosis processes, histone modifications, and DNA methylation were assessed by Real-Time PCR (qPCR), histology, and chromatin immunoprecipitation combined with qPCR analysis (ChIP-qPCR). The results showed that 5 μg/L BPA down-regulated oocyte maturation-promoting signals, likely through changes in the chromatin structure mediated by histone modifications, and promoted apoptosis in mature follicles. These data indicate that the negative effects of BPA on the female reproductive system may be due to its upstream ability to deregulate epigenetic mechanism. PMID:26911650

  19. BPA-Induced Deregulation Of Epigenetic Patterns: Effects On Female Zebrafish Reproduction.

    PubMed

    Santangeli, Stefania; Maradonna, Francesca; Gioacchini, Giorgia; Cobellis, Gilda; Piccinetti, Chiara Carla; Dalla Valle, Luisa; Carnevali, Oliana

    2016-01-01

    Bisphenol A (BPA) is one of the commonest Endocrine Disruptor Compounds worldwide. It interferes with vertebrate reproduction, possibly by inducing deregulation of epigenetic mechanisms. To determine its effects on female reproductive physiology and investigate whether changes in the expression levels of genes related to reproduction are caused by histone modifications, BPA concentrations consistent with environmental exposure were administered to zebrafish for three weeks. Effects on oocyte growth and maturation, autophagy and apoptosis processes, histone modifications, and DNA methylation were assessed by Real-Time PCR (qPCR), histology, and chromatin immunoprecipitation combined with qPCR analysis (ChIP-qPCR). The results showed that 5 μg/L BPA down-regulated oocyte maturation-promoting signals, likely through changes in the chromatin structure mediated by histone modifications, and promoted apoptosis in mature follicles. These data indicate that the negative effects of BPA on the female reproductive system may be due to its upstream ability to deregulate epigenetic mechanism. PMID:26911650

  20. "Stockpile" of Slight Transcriptomic Changes Determines the Indirect Genotoxicity of Low-Dose BPA in Thyroid Cells.

    PubMed

    Porreca, Immacolata; Ulloa Severino, Luisa; D'Angelo, Fulvio; Cuomo, Danila; Ceccarelli, Michele; Altucci, Lucia; Amendola, Elena; Nebbioso, Angela; Mallardo, Massimo; De Felice, Mario; Ambrosino, Concetta

    2016-01-01

    Epidemiological and experimental data highlighted the thyroid-disrupting activity of bisphenol A (BPA). Although pivotal to identify the mechanisms of toxicity, direct low-dose BPA effects on thyrocytes have not been assessed. Here, we report the results of microarray experiments revealing that the transcriptome reacts dynamically to low-dose BPA exposure, adapting the changes in gene expression to the exposure duration. The response involves many genes, enriching specific pathways and biological functions mainly cell death/proliferation or DNA repair. Their expression is only slightly altered but, since they enrich specific pathways, this results in major effects as shown here for transcripts involved in the DNA repair pathway. Indeed, even though no phenotypic changes are induced by the treatment, we show that the exposure to BPA impairs the cell response to further stressors. We experimentally verify that prolonged exposure to low doses of BPA results in a delayed response to UV-C-induced DNA damage, due to impairment of p21-Tp53 axis, with the BPA-treated cells more prone to cell death and DNA damage accumulation. The present findings shed light on a possible mechanism by which BPA, not able to directly cause genetic damage at environmental dose, may exert an indirect genotoxic activity. PMID:26982218

  1. “Stockpile” of Slight Transcriptomic Changes Determines the Indirect Genotoxicity of Low-Dose BPA in Thyroid Cells

    PubMed Central

    Porreca, Immacolata; Ulloa Severino, Luisa; D’Angelo, Fulvio; Cuomo, Danila; Ceccarelli, Michele; Altucci, Lucia; Amendola, Elena; Nebbioso, Angela; Mallardo, Massimo

    2016-01-01

    Epidemiological and experimental data highlighted the thyroid-disrupting activity of bisphenol A (BPA). Although pivotal to identify the mechanisms of toxicity, direct low-dose BPA effects on thyrocytes have not been assessed. Here, we report the results of microarray experiments revealing that the transcriptome reacts dynamically to low-dose BPA exposure, adapting the changes in gene expression to the exposure duration. The response involves many genes, enriching specific pathways and biological functions mainly cell death/proliferation or DNA repair. Their expression is only slightly altered but, since they enrich specific pathways, this results in major effects as shown here for transcripts involved in the DNA repair pathway. Indeed, even though no phenotypic changes are induced by the treatment, we show that the exposure to BPA impairs the cell response to further stressors. We experimentally verify that prolonged exposure to low doses of BPA results in a delayed response to UV-C-induced DNA damage, due to impairment of p21-Tp53 axis, with the BPA-treated cells more prone to cell death and DNA damage accumulation. The present findings shed light on a possible mechanism by which BPA, not able to directly cause genetic damage at environmental dose, may exert an indirect genotoxic activity. PMID:26982218

  2. An analytical study of the interaction of technological and administrative decision-making in the defining of Mars Project Viking. Ph.D. Thesis - Union College

    NASA Technical Reports Server (NTRS)

    Mcnulty, J. F.

    1974-01-01

    An analysis of the history and background of the Mars Project Viking is presented. The organization and functions of the engineering group responsible for the project are defined. The design and configuration of the proposed space vehicle are examined. Illustrations and tables of data are provided to complete the coverage of the project.

  3. Exposure assessment of adult intake of bisphenol A (BPA) with emphasis on canned food dietary exposures

    PubMed Central

    Lorber, Matthew; Schecter, Arnold; Paepke, Olaf; Shropshire, William; Christensen, Krista; Birnbaum, Linda

    2015-01-01

    Bisphenol A (BPA) is a high-volume, synthetic compound found in epoxy resins and plastics used in food packaging. Food is believed to be a major source of BPA intake. In this study, we measured the concentration of BPA in convenience samplings of foodstuffs purchased in Dallas, Texas. Sampling entailed collection of 204 samples of fresh, frozen, and canned foods in two rounds in 2010. BPA was positive in 73% of the canned food samples, while it was found in only 7% of non-canned foods at low concentrations. The results of this food sampling program were used to calculate adult dietary intakes of BPA. A pathway approach combined food intakes, a “canned fraction” parameter which described what portion of total intake of that food came from canned products, and measured food concentrations. Dietary intakes were calculated as 12.6 ng/kg-day, of which 12.4 ng/kg-day was from canned foods. Canned vegetable intakes alone were 11.9 ng/kg-day. This dietary intake was compared to total intakes of BPA estimated from urine measurements of the National Health and Nutrition Examination Survey (NHANES). Total adult central tendency intakes ranged from 30 to 70 ng/kg-day for NHANES cycles between 2005 and 2010. Three possibilities were explored to explain the difference between these two approaches for intake estimation. Not all foods which may have been canned, particularly canned beverages such as soft drinks, were sampled in our food sampling program. Second, non-food pathways of exposure may be important for adults, including thermal paper exposures, and dust and air exposures. Finally, our canned food concentrations may not be adequately representative of canned foods in the United States; they were found to be generally lower compared to canned food concentrations measured in six other worldwide food surveys including three in North America. Our finding that canned food concentrations greatly exceeded non-canned concentrations was consistent with other studies, and

  4. Exposure assessment of adult intake of bisphenol A (BPA) with emphasis on canned food dietary exposures.

    PubMed

    Lorber, Matthew; Schecter, Arnold; Paepke, Olaf; Shropshire, William; Christensen, Krista; Birnbaum, Linda

    2015-04-01

    Bisphenol A (BPA) is a high-volume, synthetic compound found in epoxy resins and plastics used in food packaging. Food is believed to be a major source of BPA intake. In this study, we measured the concentration of BPA in convenience samplings of foodstuffs purchased in Dallas, Texas. Sampling entailed collection of 204 samples of fresh, frozen, and canned foods in two rounds in 2010. BPA was positive in 73% of the canned food samples, while it was found in only 7% of non-canned foods at low concentrations. The results of this food sampling program were used to calculate adult dietary intakes of BPA. A pathway approach combined food intakes, a "canned fraction" parameter which described what portion of total intake of that food came from canned products, and measured food concentrations. Dietary intakes were calculated as 12.6 ng/kg-day, of which 12.4 ng/kg-day was from canned foods. Canned vegetable intakes alone were 11.9 ng/kg-day. This dietary intake was compared to total intakes of BPA estimated from urine measurements of the National Health and Nutrition Examination Survey (NHANES). Total adult central tendency intakes ranged from 30 to 70 ng/kg-day for NHANES cycles between 2005 and 2010. Three possibilities were explored to explain the difference between these two approaches for intake estimation. Not all foods which may have been canned, particularly canned beverages such as soft drinks, were sampled in our food sampling program. Second, non-food pathways of exposure may be important for adults, including thermal paper exposures, and dust and air exposures. Finally, our canned food concentrations may not be adequately representative of canned foods in the United States; they were found to be generally lower compared to canned food concentrations measured in six other worldwide food surveys including three in North America. Our finding that canned food concentrations greatly exceeded non-canned concentrations was consistent with other studies, and

  5. Modernizing Administration.

    ERIC Educational Resources Information Center

    Lombardi, Vincent L.; Hildebrand, Verna

    1981-01-01

    Suggests assignment of research duties and rotation of teaching and management roles for college administrators, to increase their effectiveness and diminish the negative effects of declining enrollments. (JD)

  6. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  7. Developmental programming: Prenatal BPA treatment disrupts timing of LH surge and ovarian follicular wave dynamics in adult sheep

    PubMed Central

    Veiga-Lopez, A; Beckett, EM; Abi Salloum, B; Ye, W; Padmanabhan, V

    2014-01-01

    Developmental exposure to BPA adversely affects reproductive function. In sheep, prenatal BPA treatment induces reproductive neuroendocrine defects, manifested as LH excess and dampened LH surge and perturbs early ovarian gene expression. In this study we hypothesized that prenatal BPA treatment will also disrupt ovarian follicular dynamics. Pregnant sheep were treated from days 30 to 90 of gestation with 3 different BPA doses (0.05, 0.5, or 5 mg/kg BW/day). All female offspring were estrus synchronized and transrectal ultrasonography was performed daily for 22 days to monitor ovarian follicular and corpora lutea dynamics. Blood samples were collected to assess hormonal preovulatory changes and luteal progesterone dynamics. Statistical analysis revealed that the time interval between the estradiol rise and the preovulatory LH surge was shortened in the BPA-treated females. None of the three BPA doses had an effect on corpora lutea, progestogenic cycles, and mean or duration of ovulatory and non-ovulatory follicles. However, differences in follicular count trajectories were evident in all three follicular size classes (2–3 mm, 4–5 mm, and ≥ 6 mm) of prenatal BPA-treated animals compared to controls. Number of follicular waves tended also to be more variable in the prenatal BPA-treated groups ranging from 2 to 5 follicular waves per cycle, while this was restricted to 3 to 4 waves in control females. These changes in ovarian follicular dynamics coupled with defects in time interval between estradiol rise and preovulatory LH release are likely to lead to subfertility in prenatal BPA-treated females. PMID:24923655

  8. Migration of bisphenol A (BPA) from can coatings into a fatty-food simulant and tuna fish.

    PubMed

    Munguía-López, E M; Gerardo-Lugo, S; Peralta, E; Bolumen, S; Soto-Valdez, H

    2005-09-01

    The effect of heat processing, storage time and temperature on the migration of bisphenol A (BPA) from organosol and epoxy can coatings to a fatty-food simulant and tuna was determined. Analyses of BPA were performed by RP-HPLC with fluorescence detection. Four migration experiments, performed between 2000 and 2003, using cans with organosol, epoxy and a combination of both types of coatings were performed under different processing conditions and storage times. Migration levels as high as 646.5 microg kg(-1) BPA from an organosol coating of tuna fish cans were found using a fatty-food simulant following the heat processing of the simulant-filled cans. Levels ranging from 11.3 to 138.4 microg kg(-1) BPA from tuna cans coated with an epoxy resin migrated to the fatty-food simulant during 1 year at 25 degrees C. Levels of BPA migration into a fatty-food simulant from thermally processed and stored tuna cans coated with a combination of organosol and epoxy resins and from vegetable cans coated with an epoxy resin were below the limit of quantitation of 10.0 microg kg(-1). Migration of BPA to tuna ranged from <7.1 to 105.4 microg kg(-1) during long-term storage at 25 degrees C. BPA levels in tuna cans purchased from three local supermarkets ranged from <7.1 to 102.7 microg kg(-1). The highest migration levels were found following heat processing at temperatures as high as 121 degrees C and at times as long as 90 min. Coatings from different can batches can give different levels of BPA migration. The migration levels of BPA found in this work are below the present European Union migration limit, except the 646.5 microg kg(-1) found after the commercial heating process was applied to the simulant-filled cans coated with the organosol resin. PMID:16192075

  9. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  10. 77 FR 52708 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... (75 FR 80542). Below we provide the BPA projected average estimates for the next three years: \\1\\ \\1...: Bonneville Power Administration (BPA), DOE. ACTION: 30-Day notice of submission of information...

  11. Bisphenol A (BPA) stimulates the interferon signaling and activates the inflammasome activity in myeloid cells.

    PubMed

    Panchanathan, Ravichandran; Liu, Hongzhu; Leung, Yuet-Kin; Ho, Shuk-mei; Choubey, Divaker

    2015-11-01

    Environmental factors contribute to the development of autoimmune diseases, including systemic lupus erythematosus (SLE), which exhibits a strong female bias (female-to-male ratio 9:1). However, the molecular mechanisms remain largely unknown. Because a feedforward loop between the female sex hormone estrogen (E2) and type I interferon (IFN-α/β)-signaling induces the expression of certain p200-family proteins (such as murine p202 and human IFI16) that regulate innate immune responses and modify lupus susceptibility, we investigated whether treatment of myeloid cells with bisphenol A (BPA), an environmental estrogen, could regulate the p200-family proteins and activate innate immune responses. We found that treatment of murine bone marrow-derived cells (BMCs) and human peripheral blood mononuclear cells with BPA induced the expression of ERα and IFN-β, activated the IFN-signaling, and stimulated the expression of the p202 and IFI16 proteins. Further, the treatment increased levels of the NLRP3 inflammasome and stimulated its activity. Accordingly, BPA-treatment of BMCs from non lupus-prone C57BL/6 and the lupus-prone (NZB×NZW)F1 mice activated the type I IFN-signaling, induced the expression of p202, and activated an inflammasome activity. Our study demonstrates that BPA-induced signaling in the murine and human myeloid cells stimulates the type I IFN-signaling that results in an induction of the p202 and IFI16 innate immune sensors for the cytosolic DNA and activates an inflammasome activity. These observations provide novel molecular insights into the role of environmental BPA exposures in potentiating the development of certain autoimmune diseases such as SLE. PMID:26277401

  12. Administrative Support.

    ERIC Educational Resources Information Center

    Doran, Dorothy; And Others

    This guide is intended to assist business education teachers in administrative support courses. The materials presented are based on the Arizona validated occupational competencies and tasks for the occupations of receptionist, secretary, and administrative assistant. Word processing skills have been infused into each of the three sections. The…

  13. Administrative Ecology

    ERIC Educational Resources Information Center

    McGarity, Augustus C., III; Maulding, Wanda

    2007-01-01

    This article discusses how all four facets of administrative ecology help dispel the claims about the "impossibility" of the superintendency. These are personal ecology, professional ecology, organizational ecology, and community ecology. Using today's superintendency as an administrative platform, current literature describes a preponderance of…

  14. Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report.

    SciTech Connect

    Hudson, R. Dennis

    2008-01-01

    On December 5, 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). The Act created the Northwest Power Planning Council (now the Northwest Power and Conservation Council). The Council was charged with the responsibility to prepare a Regional Conservation and Electric Power Plan and to develop a program to protect, mitigate, and enhance fish and wildlife including related spawning grounds and habitat on the Columbia River and its tributaries. The Council adopted its Fish and Wildlife Program on November 15, 1982. Section 800 of the Program addresses measures in the Yakima River Basin. The Yakima measures were intended to help mitigate hydroelectric impacts in the basin and provide off-site mitigation to compensate for fish losses caused by hydroelectric project development and operations throughout the Columbia River Basin. The Bonneville Power Administration (BPA) was designated as a major source of funding for such off-site mitigation measures and was requested to initiate discussions with the appropriate Federal project operators and the Council to determine the most expeditious means for funding and implementing the program. The primary measures proposed for rapid implementation in the Yakima River basin were the installation of fish passage and protective facilities. Sec. 109 of The Hoover Power Plant Act of 1984, authorized the Secretary of the Interior to design, construct, operate, and maintain fish passage facilities within the Yakima River Basin. Under Phase I of the program, improvements to existing fish passage facilities and installation of new fish ladders and fish screens at 16 of the largest existing diversion dams and canals were begun in 1984 and were completed in 1990. The Yakima Phase II fish passage program is an extension of the Phase I program. In 1988, the Yakama Nation (YN) submitted an application to amend Sections 803(b) and 1403(4.5) of the Northwest Power and Conservation Council

  15. Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.

    SciTech Connect

    Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

    1991-05-20

    The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

  16. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    SciTech Connect

    Patterson, Scott

    2009-04-10

    Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an

  17. Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.

    SciTech Connect

    Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

    2006-11-01

    The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines for cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off

  18. Preliminary Design Report for the Yakima/Klickitat Production Project.

    SciTech Connect

    US Bonneville Power Administration

    1990-04-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Task 1. Agreement on a refined statement of project goals. Task 2. Completion of a technical analysis of water supplies. Task 3. Completion of an experimental design plan. Task 4. Development of a harvest management plan. Task 5. Assessment of potential genetic risks. Task 6. Project coordination with all other affected parties. Task 7. Submission of a preliminary design report to the Council. Task 8. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  19. Holding thermal receipt paper and eating food after using hand sanitizer results in high serum bioactive and urine total levels of bisphenol A (BPA).

    PubMed

    Hormann, Annette M; Vom Saal, Frederick S; Nagel, Susan C; Stahlhut, Richard W; Moyer, Carol L; Ellersieck, Mark R; Welshons, Wade V; Toutain, Pierre-Louis; Taylor, Julia A

    2014-01-01

    Bisphenol A (BPA) is an endocrine disrupting environmental contaminant used in a wide variety of products, and BPA metabolites are found in almost everyone's urine, suggesting widespread exposure from multiple sources. Regulatory agencies estimate that virtually all BPA exposure is from food and beverage packaging. However, free BPA is applied to the outer layer of thermal receipt paper present in very high (∼20 mg BPA/g paper) quantities as a print developer. Not taken into account when considering thermal paper as a source of BPA exposure is that some commonly used hand sanitizers, as well as other skin care products, contain mixtures of dermal penetration enhancing chemicals that can increase by up to 100 fold the dermal absorption of lipophilic compounds such as BPA. We found that when men and women held thermal receipt paper immediately after using a hand sanitizer with penetration enhancing chemicals, significant free BPA was transferred to their hands and then to French fries that were eaten, and the combination of dermal and oral BPA absorption led to a rapid and dramatic average maximum increase (Cmax) in unconjugated (bioactive) BPA of ∼7 ng/mL in serum and ∼20 µg total BPA/g creatinine in urine within 90 min. The default method used by regulatory agencies to test for hazards posed by chemicals is intra-gastric gavage. For BPA this approach results in less than 1% of the administered dose being bioavailable in blood. It also ignores dermal absorption as well as sublingual absorption in the mouth that both bypass first-pass liver metabolism. The elevated levels of BPA that we observed due to holding thermal paper after using a product containing dermal penetration enhancing chemicals have been related to an increased risk for a wide range of developmental abnormalities as well as diseases in adults. PMID:25337790

  20. Holding Thermal Receipt Paper and Eating Food after Using Hand Sanitizer Results in High Serum Bioactive and Urine Total Levels of Bisphenol A (BPA)

    PubMed Central

    Hormann, Annette M.; vom Saal, Frederick S.; Nagel, Susan C.; Stahlhut, Richard W.; Moyer, Carol L.; Ellersieck, Mark R.; Welshons, Wade V.; Toutain, Pierre-Louis; Taylor, Julia A.

    2014-01-01

    Bisphenol A (BPA) is an endocrine disrupting environmental contaminant used in a wide variety of products, and BPA metabolites are found in almost everyone’s urine, suggesting widespread exposure from multiple sources. Regulatory agencies estimate that virtually all BPA exposure is from food and beverage packaging. However, free BPA is applied to the outer layer of thermal receipt paper present in very high (∼20 mg BPA/g paper) quantities as a print developer. Not taken into account when considering thermal paper as a source of BPA exposure is that some commonly used hand sanitizers, as well as other skin care products, contain mixtures of dermal penetration enhancing chemicals that can increase by up to 100 fold the dermal absorption of lipophilic compounds such as BPA. We found that when men and women held thermal receipt paper immediately after using a hand sanitizer with penetration enhancing chemicals, significant free BPA was transferred to their hands and then to French fries that were eaten, and the combination of dermal and oral BPA absorption led to a rapid and dramatic average maximum increase (Cmax) in unconjugated (bioactive) BPA of ∼7 ng/mL in serum and ∼20 µg total BPA/g creatinine in urine within 90 min. The default method used by regulatory agencies to test for hazards posed by chemicals is intra-gastric gavage. For BPA this approach results in less than 1% of the administered dose being bioavailable in blood. It also ignores dermal absorption as well as sublingual absorption in the mouth that both bypass first-pass liver metabolism. The elevated levels of BPA that we observed due to holding thermal paper after using a product containing dermal penetration enhancing chemicals have been related to an increased risk for a wide range of developmental abnormalities as well as diseases in adults. PMID:25337790

  1. BPA and phthalate fate in a sewage network and an elementary river of France. Influence of hydroclimatic conditions.

    PubMed

    Tran, Bich Chau; Teil, Marie Jeanne; Blanchard, Martine; Alliot, Fabrice; Chevreuil, Marc

    2015-01-01

    Our purpose was to characterize the fate of bisphenol A (BPA) and phthalate contamination simultaneously in a sewage network and a watercourse, in relation with hydrological and climatic conditions. An elementary catchment of the Seine basin, receiving effluents from a wastewater treatment plant (WWTP), was chosen because of its basic hydrological features. BPA and DEHP concentrations in the WWTP inputs were 4 and 33 μg L(-1) whereas in the outputs, they were only 0.4 and 2 μg L(-1), respectively. Contaminant ratios in the suspended sediment phase of the WWTP inputs ranged from 0.5% to 88%, related to their molecular properties. BPA and phthalates were effectively removed in the WWTP (>90% for both compounds), by degradation and decantation. Upstream of the discharge, river concentrations ranged from 0.002 to 0.175 μg L(-1) for BPA and from 0.16 to 0.90 μg L(-1) for DEHP. Downstream from the WWTP outputs, concentrations ranged from 0.11 to 0.79 μg L(-1) for BPA and from 0.31 μg L(-1) to 1.7 μg L(-1) for DEHP: the WWTP discharge led to contaminant increases of 3.8 and 2 times, respectively. Far downstream, concentrations were lower ranging from 0.11 to 0.19 μg L(-1) for BPA and from 0.36 μg L(-1) to 1.1 μg L(-1) for DEHP. BPA and phthalates displayed opposite seasonal variations with a decrease for the first one and an increase for the second one during summer. BPA contamination in the Charmoise river derived mainly from the WWTP, while phthalate contamination was attributed to both WWTP discharges and diffuse sources such as atmospheric bulk deposition. PMID:24964009

  2. The Autotransporter BpaB Contributes to the Virulence of Burkholderia mallei in an Aerosol Model of Infection

    PubMed Central

    Zimmerman, Shawn M.; Michel, Frank

    2015-01-01

    Burkholderia mallei is a highly pathogenic bacterium that causes the zoonosis glanders. Previous studies indicated that the genome of the organism contains eight genes specifying autotransporter proteins, which are important virulence factors of Gram-negative bacteria. In the present study, we report the characterization of one of these autotransporters, BpaB. Database searches identified the bpaB gene in ten B. mallei isolates and the predicted proteins were 99-100% identical. Comparative sequence analyses indicate that the gene product is a trimeric autotransporter of 1,090 amino acids with a predicted molecular weight of 105-kDa. Consistent with this finding, we discovered that recombinant bacteria expressing bpaB produce a protein of ≥300-kDa on their surface that is reactive with a BpaB-specific monoclonal antibody. Analysis of sera from mice infected with B. mallei indicated that animals produce antibodies against BpaB during the course of disease, thus establishing production of the autotransporter in vivo. To gain insight on its role in virulence, we inactivated the bpaB gene of B. mallei strain ATCC 23344 and determined the median lethal dose of the mutant in a mouse model of aerosol infection. These experiments revealed that the bpaB mutation attenuates virulence 8-14 fold. Using a crystal violet-based assay, we also discovered that constitutive production of BpaB on the surface of B. mallei promotes biofilm formation. To our knowledge, this is the first report of a biofilm factor for this organism. PMID:25993100

  3. A Discriminant Analysis of Majors in the College Business and Public Administration at the University of North Dakota. North Dakota Economics Studies, Number 52.

    ERIC Educational Resources Information Center

    Tedefalk, Rolf K.

    Researchers have demonstrated that particular careers attract individuals with distinct identifiable personality profiles and learning styles, and this idea is extended to the selection of majors within the College of Business and Public Administration (BPA) at the University of North Dakota. The Myers-Briggs Type Indicator (MBTI) was used both to…

  4. Electroenzymatic oxidation of bisphenol A (BPA) based on the hemoglobin (Hb) film in a membraneless electrochemical reactor.

    PubMed

    Tang, Tiantian; Hou, Juying; Ai, Shiyun; Qiu, Yanyan; Ma, Qiang; Han, Ruixia

    2010-09-15

    This paper presents a novel electroenzymatic method for the treatment of bisphenol A (BPA) in a membraneless electrochemical reactor. The electrochemical reactor was arranged with a stainless steel and an enzymatic film as anode and cathode, respectively. The enzymatic film was formed by immobilizing hemoglobin (Hb) on carbon fiber. In the membraneless electrochemical reactor, hydrogen peroxide (H(2)O(2)) was generated in situ in cathode and BPA was oxidated and removed by the combining Hb with H(2)O(2). The experimental conditions for electrogeneration of H(2)O(2) and electroremoval of BPA were optimized. Experimental results showed that in supplied voltage 2.4 V, pH 5.0 and oxygen flow rate 25 mL/min, the electrogeneration of H(2)O(2) and the electroenzymatic removal of BPA were highest. Under optimal operation conditions, the removal efficiency of BPA reached 50.7% in 120 min and then kept constant when further prolonging the period of reaction. Compared with electrochemical and biochemical methods, the removal of BPA through electroenzymatic method was comparatively favorable. PMID:20605681

  5. A Report of the Project Statewide Infusion of Career Education into the Preparation of Teachers, Counselors and Administrators. Final Performance Report.

    ERIC Educational Resources Information Center

    Luft, Roger L.; And Others

    Career education staff development activities were conducted by Oregon's Interinstitutional Consortium for Career Education in three phases: (1) staff development for college and university faculties (also reported separately in CE 019 417); (2) program development for teacher, counselor, and administrator preparation; and (3) teacher…

  6. The U.S. Food and Drug Administration's Evaluation of the Safety of Animal Clones: A Failure to Recognize the Normativity of Risk Assessment Projects

    ERIC Educational Resources Information Center

    Meghani, Zahra; de Melo-Martin, Inmaculada

    2009-01-01

    The U.S. Food and Drug Administration (FDA) announced recently that food products derived from some animal clones and their offspring are safe for human consumption. In response to criticism that it had failed to engage with ethical, social, and economic concerns raised by livestock cloning, the FDA argued that addressing normative issues prior to…

  7. Biotransformation of glyceryl trinitrate (GTN) in isolated bovine pulmonary artery (BPA) and bovine pulmonary vein (BPV)

    SciTech Connect

    Not Available

    1986-03-01

    A proposed mechanism of GTN-induced vasodilation requires biotransformation of GTN to glyceryl dinitrate (GDN). They have previously shown that GTN is metabolized to GDN during relaxation of isolated rabbit aorta. The authors have extended this study to include BPA and BPV and to determine if their sensitivity to GTN correlates with their ability to metabolize GTN. Strips of BPA and BPV were contracted submaximally with KCl and then incubated with 0.5 ..mu..M /sup 14/C-GTN for 2 min. GTN-induced relaxation of these vessels was monitored and tissue GTN and metabolite concentrations were measured. Data are presented which support the above hypothesis that GTN biotransformation and relaxation occur together in vascular smooth muscle; however, there appear to be factors other than extent of GTN biotransformation that account for the difference in sensitivity to GTN of the artery and vein.

  8. Residential construction demonstration project, Cycle II: Active ventilation

    SciTech Connect

    Not Available

    1991-01-01

    This report documents the analysis of the performance of natural and mechanical ventilation in Pacific Northwest homes. The analysis was part of Cycle II of the Residential Construction Demonstration Project, sponsored by Bonneville Power Administration (BPA). Since 1986, the Residential Construction Demonstration Project (RCDP) has sponsored the collection of data on energy efficient homes in the Pacific Northwest that comply with these new standards and requirements. Cycle II of RCDP was conducted between September 1987 and April 1990. It concentrated on energy innovations in homes built to the Super Good Cents specification. All of the test homes have electric heat and mechanical ventilation systems. Seven different types of active ventilation systems are represented in the homes. Three of these system types are equipped with heat recovery devices, and are represented in approximately a quarter of the test homes. The potential for both natural and mechanical ventilation was measured. Potential structural leakage was measured by blower door testing. Flow rate and operating time of mechanical ventilation systems were measured with flow hoods and hour meters. Actual ventilation was measured by using a passive tracer gas technique for several weeks during the heating season and at times of normal occupancy.

  9. Residential construction demonstration project, Cycle II: Active ventilation

    SciTech Connect

    Not Available

    1991-12-31

    This report documents the analysis of the performance of natural and mechanical ventilation in Pacific Northwest homes. The analysis was part of Cycle II of the Residential Construction Demonstration Project, sponsored by Bonneville Power Administration (BPA). Since 1986, the Residential Construction Demonstration Project (RCDP) has sponsored the collection of data on energy efficient homes in the Pacific Northwest that comply with these new standards and requirements. Cycle II of RCDP was conducted between September 1987 and April 1990. It concentrated on energy innovations in homes built to the Super Good Cents specification. All of the test homes have electric heat and mechanical ventilation systems. Seven different types of active ventilation systems are represented in the homes. Three of these system types are equipped with heat recovery devices, and are represented in approximately a quarter of the test homes. The potential for both natural and mechanical ventilation was measured. Potential structural leakage was measured by blower door testing. Flow rate and operating time of mechanical ventilation systems were measured with flow hoods and hour meters. Actual ventilation was measured by using a passive tracer gas technique for several weeks during the heating season and at times of normal occupancy.

  10. Might iodomethyl-{alpha}-tyrosine be a surrogate for BPA in BNCT?

    SciTech Connect

    Miura, Michiko; Micca, P.L.; Nawrocky, M.M.; Slatkin, D.N.

    1996-12-31

    A single-photon emission computed tomography [SPECT] imaging agent that is an analogue of a boron carrier for boron neutron-capture therapy [BNCT] of cerebral gliomas would be useful for assessing the kinetics of boron uptake in tumors and in the surrounding brain tissues noninvasively. BNCT is based on the interaction of thermalized neutrons with {sup 10}B nuclei in the targeted tumor. For BNCT of brain tumors, it is crucial that {sup 10}B concentrations in radiosensitive regions of the brain be minimal since malignant cells and vital brain tissues are often inter-mingled at the margins of the tumor. Currently, boronophenylalanine [BPA]-mediated BNCT is undergoing preliminary clinical study for postoperative radiotherapy of glioblastorna multiforme at Brookhaven National Laboratory. Investigators in Japan are developing {sup 18}F-fluoroboronophenylaianine [FBPA] as a positron {sup 18}F (T{sub 1/2} = 110 min), which is usually emission tomography [PET] surrogate for BPA. generated at a cyclotron dedicated to PET, is generally a minimally perturbing substitute for the 2-H on the aromatic ring because of its small size and the strong covalent bond it forms with carbon. However, SPECT has potential advantages over PET: (1) SPECT is clinically more widely available at lower cost; (2) most radioisotopes for the synthesis of SPECT agents can be purchased; (3) SPECT is less difficult to implement. It is thought that the quality of images derived from the two techniques would each be sufficiently informative for BNCT treatment planning purposes, provided that the SPECT and PET agents being considered were both pharmacokinetic surrogates for BPA. This study evaluated the use of {sup 123}I alpha methyltyrosine as a surrogate for BPA in BNCT.

  11. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    SciTech Connect

    Not Available

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  12. Estrogenic Effects of Several BPA Analogs in the Developing Zebrafish Brain

    PubMed Central

    Cano-Nicolau, Joel; Vaillant, Colette; Pellegrini, Elisabeth; Charlier, Thierry D.; Kah, Olivier; Coumailleau, Pascal

    2016-01-01

    Important set of studies have demonstrated the endocrine disrupting activity of Bisphenol A (BPA). The present work aimed at defining estrogenic-like activity of several BPA structural analogs, including BPS, BPF, BPAF, and BPAP, on 4- or 7-day post-fertilization (dpf) zebrafish larva as an in vivo model. We measured the induction level of the estrogen-sensitive marker cyp19a1b gene (Aromatase B), expressed in the brain, using three different in situ/in vivo strategies: (1) Quantification of cyp19a1b transcripts using RT-qPCR in wild type 7-dpf larva brains exposed to bisphenols; (2) Detection and distribution of cyp19a1b transcripts using in situ hybridization on 7-dpf brain sections (hypothalamus); and (3) Quantification of the cyp19a1b promoter activity in live cyp19a1b-GFP transgenic zebrafish (EASZY assay) at 4-dpf larval stage. These three different experimental approaches demonstrated that BPS, BPF, or BPAF exposure, similarly to BPA, significantly activates the expression of the estrogenic marker in the brain of developing zebrafish. In vitro experiments using both reporter gene assay in a glial cell context and competitive ligand binding assays strongly suggested that up-regulation of cyp19a1b is largely mediated by the zebrafish estrogen nuclear receptor alpha (zfERα). Importantly, and in contrast to other tested bisphenol A analogs, the bisphenol AP (BPAP) did not show estrogenic activity in our model. PMID:27047331

  13. Estrogenic Effects of Several BPA Analogs in the Developing Zebrafish Brain.

    PubMed

    Cano-Nicolau, Joel; Vaillant, Colette; Pellegrini, Elisabeth; Charlier, Thierry D; Kah, Olivier; Coumailleau, Pascal

    2016-01-01

    Important set of studies have demonstrated the endocrine disrupting activity of Bisphenol A (BPA). The present work aimed at defining estrogenic-like activity of several BPA structural analogs, including BPS, BPF, BPAF, and BPAP, on 4- or 7-day post-fertilization (dpf) zebrafish larva as an in vivo model. We measured the induction level of the estrogen-sensitive marker cyp19a1b gene (Aromatase B), expressed in the brain, using three different in situ/in vivo strategies: (1) Quantification of cyp19a1b transcripts using RT-qPCR in wild type 7-dpf larva brains exposed to bisphenols; (2) Detection and distribution of cyp19a1b transcripts using in situ hybridization on 7-dpf brain sections (hypothalamus); and (3) Quantification of the cyp19a1b promoter activity in live cyp19a1b-GFP transgenic zebrafish (EASZY assay) at 4-dpf larval stage. These three different experimental approaches demonstrated that BPS, BPF, or BPAF exposure, similarly to BPA, significantly activates the expression of the estrogenic marker in the brain of developing zebrafish. In vitro experiments using both reporter gene assay in a glial cell context and competitive ligand binding assays strongly suggested that up-regulation of cyp19a1b is largely mediated by the zebrafish estrogen nuclear receptor alpha (zfERα). Importantly, and in contrast to other tested bisphenol A analogs, the bisphenol AP (BPAP) did not show estrogenic activity in our model. PMID:27047331

  14. College Administration: Concepts and Techniques.

    ERIC Educational Resources Information Center

    Feltner, Bill D., Ed.

    Ten colleges participated in a project to: (1) help organize and strengthen administrative teams in developing two-year and four-year colleges throughout the Southeast; (2) to assist administrative teams in identifying specific roles for each team member and in developing an understanding of team responsibilities; and (3) to assist administrative…

  15. The DOE Wide Area Measurement System (WAMS) Project -- Demonstration of dynamic information technology for the future power system

    SciTech Connect

    Mittelstadt, W.A.; Hauer, J.F.; Krause, P.E.; Wilson, R.E.; Overholt, P.N.; Rizy, D.T.

    1995-12-31

    In 1989 the Bonneville Power Administration (BPA) and the Western Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands in an environment characterized by increased competition, a wider range of services and vendors, and much narrower operating margins. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI).

  16. Djeen (Database for Joomla!’s Extensible Engine): a research information management system for flexible multi-technology project administration

    PubMed Central

    2013-01-01

    Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665

  17. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  18. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation AdministrationProject 209 Control Tower and Support Building Oakland, CA

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-03-01

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  19. Methods for Valuation of Environmental Costs and Benefits of Hydroelectric Facilities : A Case Study of the Sultan River Project : Final Report.

    SciTech Connect

    BioSystems Analysis, Inc.

    1984-06-05

    The Bonneville Power Administration is required by the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501) to include quantifiable environmental costs and benefits of alternative electric power resources in determining their cost-effectiveness. In responding to this requirement, BPA has contracted to develop and test methodologies for valuing environmental costs of various types of power resources, including hydroelectric facilities. The purpose of this study is to develop and test valuation methods for hydroelectric facilities, using the Sultan River Project as a case study. The case study approach offers several advantages and some disadvantages which should be considered in interpreting this report. Its primary advantage lies in providing a real-world example against which to test theoretical valuation approaches. Using data that were actually collected for a project that has received detailed scrutiny from its sponsor and from numerous regulatory agencies allows more realistic formulation of valuation issues and also provides a better test of the practicality and usefulness of valuation methods. On the other hand, results derived from such an approach must be used with discretion. First and most obvious, both the features of a hydroproject and its environmental impacts may vary widely from site to site. Second, it cannot be assumed that the results of these test exercises for the Sultan River Project represent any kind of generic hydroelectric environmental cost. A third caution is directed to those who may be tempted to regard this report as a definitive estimate of the environmental costs of the Sultan River Project. It is not. A fourth important point is only external or residual environmental costs are developed in this report. Finally, it should be noted that these methodologies were developed to meet the needs of BPA's process for determining resource cost-effectiveness.

  20. Administrative IT

    ERIC Educational Resources Information Center

    Grayson, Katherine, Ed.

    2006-01-01

    When it comes to Administrative IT solutions and processes, best practices range across the spectrum. Enterprise resource planning (ERP), student information systems (SIS), and tech support are prominent and continuing areas of focus. But widespread change can also be accomplished via the implementation of campuswide document imaging and sharing,…

  1. Engineering Administration.

    ERIC Educational Resources Information Center

    Naval Personnel Program Support Activity, Washington, DC.

    This book is intended to acquaint naval engineering officers with their duties in the engineering department. Standard shipboard organizations are analyzed in connection with personnel assignments, division operations, and watch systems. Detailed descriptions are included for the administration of directives, ship's bills, damage control, training…

  2. ADMINISTRATIVE CLIMATE.

    ERIC Educational Resources Information Center

    BRUCE, ROBERT L.; CARTER, G.L., JR.

    IN THE COOPERATIVE EXTENSION SERVICE, STYLES OF LEADERSHIP PROFOUNDLY AFFECT THE QUALITY OF THE SERVICE RENDERED. ACCORDINGLY, MAJOR INFLUENCES ON ADMINISTRATIVE CLIMATE AND EMPLOYEE PRODUCTIVITY ARE EXAMINED IN ESSAYS ON (1) SOURCES OF JOB SATISFACTION AND DISSATISFACTION, (2) MOTIVATIONAL THEORIES BASED ON JOB-RELATED SATISFACTIONS AND NEEDS,…

  3. Database Administrator

    ERIC Educational Resources Information Center

    Moore, Pam

    2010-01-01

    The Internet and electronic commerce (e-commerce) generate lots of data. Data must be stored, organized, and managed. Database administrators, or DBAs, work with database software to find ways to do this. They identify user needs, set up computer databases, and test systems. They ensure that systems perform as they should and add people to the…

  4. 26 CFR 301.7430-4 - Reasonable administrative costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings Civil Actions by the United... witnesses; (iii) Reasonable costs of any study, analysis, engineering report, test or project that...

  5. 26 CFR 301.7430-4 - Reasonable administrative costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings Civil Actions by the United... witnesses; (iii) Reasonable costs of any study, analysis, engineering report, test or project that...

  6. 26 CFR 301.7430-4 - Reasonable administrative costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings Civil Actions by the United... witnesses; (iii) Reasonable costs of any study, analysis, engineering report, test or project that...

  7. Construction Administration.

    ERIC Educational Resources Information Center

    Barley, John McKim, II

    1986-01-01

    Successful completion of a construction project requires the efforts of a team composed of the owner, architect, and contractor. A preconstruction conference can clarify the roles of the team as specified in the design contract. (MLF)

  8. Photocatalytic degradation of Bisphenol A (BPA) using immobilized TiO2 and UV illumination in a horizontal circulating bed photocatalytic reactor (HCBPR).

    PubMed

    Wang, Rongchang; Ren, Dianjun; Xia, Siqing; Zhang, Yalei; Zhao, Jianfu

    2009-09-30

    Photocatalytic degradation of Bisphenol A (BPA) in the presence of titanium dioxide (TiO(2)) and ultraviolet (UV) illumination was performed in a self-designed horizontal circulating bed photocatalytic reactor (HCBPR). TiO(2) catalyst was immobilized on the surface of polyurethane foam (PF) cubes via microwave-assisted liquid phase deposition. The effects of initial BPA concentration, initial pH, TiO(2) dosage and temperature on BPA photodegradation were investigated in order to obtain the optimum operational conditions. The results reveal that the BPA degradation efficiency can be effectively improved by increasing pH from 3.4 to 12.3 or decreasing the initial BPA concentration from 50 to 10 ppm. The optimum TiO(2) carrier dosage (the ratio of the volume of PF carriers to the effective reaction volume of HCBPR) was about 1%. Besides, the effect of temperature on BPA photodegradation was found to be unremarkable in the range of 21.2-30.5 degrees C. Total organic carbon (TOC) was used to evaluate the mineralization of BPA during the photodegradation process. Under the optimum conditions, 95% removal of TOC and 97% removal of BPA can be achieved after 6h of UV radiation, which demonstrates the high photodegradation efficiency of BPA in HCBPR. PMID:19500904

  9. The Molecular Mechanism of Bisphenol A (BPA) as an Endocrine Disruptor by Interacting with Nuclear Receptors: Insights from Molecular Dynamics (MD) Simulations

    PubMed Central

    Li, Lanlan; Wang, Qianqian; Zhang, Yan; Niu, Yuzhen; Yao, Xiaojun; Liu, Huanxiang

    2015-01-01

    Bisphenol A (BPA) can interact with nuclear receptors and affect the normal function of nuclear receptors in very low doses, which causes BPA to be one of the most controversial endocrine disruptors. However, the detailed molecular mechanism about how BPA interferes the normal function of nuclear receptors is still undiscovered. Herein, molecular dynamics simulations were performed to explore the detailed interaction mechanism between BPA with three typical nuclear receptors, including hERα, hERRγ and hPPARγ. The simulation results and calculated binding free energies indicate that BPA can bind to these three nuclear receptors. The binding affinities of BPA were slightly lower than that of E2 to these three receptors. The simulation results proved that the binding process was mainly driven by direct hydrogen bond and hydrophobic interactions. In addition, structural analysis suggested that BPA could interact with these nuclear receptors by mimicking the action of natural hormone and keeping the nuclear receptors in active conformations. The present work provided the structural evidence to recognize BPA as an endocrine disruptor and would be important guidance for seeking safer substitutions of BPA. PMID:25799048

  10. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  11. BPA and NP removal from municipal wastewater by tropical horizontal subsurface constructed wetlands.

    PubMed

    Toro-Vélez, A F; Madera-Parra, C A; Peña-Varón, M R; Lee, W Y; Bezares-Cruz, J C; Walker, W S; Cárdenas-Henao, H; Quesada-Calderón, S; García-Hernández, H; Lens, P N L

    2016-01-15

    It has been recognized that numerous synthetic compounds like Bisphenol A (BPA) and nonylphenols (NP) are present in effluents from wastewater treatment plants (WWTP) at levels of parts per billion (μg L(-1)) or even parts per trillion (ng L(-1)) with a high potential to cause endocrine disruption in the aquatic environment. Constructed wetlands (CW) are a cost-effective wastewater treatment alternative with promising performance to treat these afore mentioned compounds. This research was aimed to evaluate the efficacy of CW treatment of WWTP effluent for mitigating the effects endocrine disrupting compounds (EDCs). This research goal was accomplished by (1) quantifying the removal of BPA and NP in CWs; (2) isolating CW fungal strains and testing for laccase production; and (3) performing endocrine disruption (reproduction) bioassays using the fruit fly Drosophila melanogaster. Three pilot scale horizontal subsurface flow constructed wetlands (HSSF-CW) were operated for eight weeks: one planted with Phragmites australis; one planted with Heliconia psitacorum; and one unplanted. The Heliconia CW showed a removal efficiency of 73.3(± 19%) and 62.8(± 20.1%) for BPA and NP, respectively; while the Phragmites CW demonstrated a similar removal for BPA (70.2 ± 27%) and lower removal efficiency for NP 52.1(± 37.1%).The unplanted CW achieved 62.2 (± 33%) removal for BPA and 25.3(± 37%) removal for NP. Four of the eleven fungal strains isolated from the Heliconia-CW showed the capacity to produce laccase. Even though complete removal of EDCs was not achieved by the CWs, the bioassay confirmed a significant improvement (p < 0.05) in fly viability for all CWs, with Heliconia sp. being the most effective at mitigating adverse effects on first and second generational reproduction. This study showed that a CW planted with a native Heliconia sp. CW demonstrated a higher removal of endocrine disrupting compounds and better mitigation of reproductive disruption in the

  12. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services AdministrationProject 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-05-28

    This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  13. Manchester Spring Chinook Broodstock Project : Progress Report, 2000.

    SciTech Connect

    McAuley, W. Carlin; Wastel, Michael R.; Flagg, Thomas A.

    2000-11-01

    In spring 1995 the Idaho Department of Fish and Game (IDFG) and the Oregon Department of Fish and Wildlife (ODFW) initiated captive broodstocks as part of conservation efforts for ESA-listed stocks of Snake River spring/summer chinook salmon (Oncorhynchus tshawytscha). The need for this captive broodstock strategy was identified as critical in the National Marine Fisheries Service (NMFS) Proposed Recovery Plan for Snake River Salmon. These captive broodstock programs are being coordinated by the Bonneville Power Administration (BPA) through the Chinook Salmon Captive Propagation Technical Oversight Committee (CSCPTOC). Oregon's Snake River spring/summer chinook salmon captive broodstock program currently focuses on three stocks captured as juveniles from the Grande Ronde River Basin: the upper Grande Ronde River, Catherine Creek, and the Lostine River. Idaho's Snake River program includes three stocks captured as eggs and juveniles from the Salmon River Basin: the Lemhi River, East Fork Salmon River, and West Fork Yankee Fork. The majority of captive fish from each stock of the Grande Ronde Basin will be grown to maturity in freshwater at the ODFW Bonneville Hatchery. A minority of the Salmon River Basin stocks will be grown to maturity in freshwater at the IDFG Eagle Hatchery. However, the IDFG and ODFW requested that a portion of each group also be reared in protective culture in seawater. In August 1996, NMFS began a BPA funded project (Project 96-067-00) to rear Snake River spring/summer chinook salmon captive broodstocks in seawater at the NMFS Manchester Research Station. During 1997-1999, facilities modifications were undertaken at Manchester to provide secure facilities for rearing of these ESA-listed fish. This included construction of a building housing a total of twenty 6.1-m diameter fiberglass rearing tanks, upgrade of the Manchester salt water pumping and filtration/sterilization systems to a total capacity of 5,670 L/min (1,500 gpm), and installation

  14. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation AdministrationProject 209 Control Tower and Support Building, Reno, Nevada

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-06-30

    Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  15. American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

    SciTech Connect

    Arends, J.; Sandusky, William F.

    2010-06-28

    This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

  16. Grande Ronde Model Watershed Program FY 1998 Habitat Projects.

    SciTech Connect

    Grande Ronde Model Watershed Staff

    1999-08-01

    The Grande Ronde Model Watershed Program (GRMWP) is the primary entity coordinating habitat restoration on both private and public lands within the Grande Ronde Basin. The Grande Ronde Basin covers approximately 5,300 square miles, containing more than 2600 miles of fish bearing streams, in the Blue Mountains of northeast Oregon. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act, are present in the basin. The GRMWP began coordinating restoration projects in 1994. Approximately 215 projects have been implemented through the GRMWP program as of 1998. Nine of these projects were funded in part through the Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These nine projects used a variety of methods to enhance and restore watershed conditions. In-stream work to improve fish habitat included construction of hard structures (eg. vortex rock weirs), placement of large woody material and whole trees, gravel bar treatments, and improvements to off-channel rearing habitat; 55 miles of stream were treated. Fish passage was improved at three locations by replacing or removing culverts that blocked fish. Stream riparian conditions were enhanced with exclosure fencing, vegetation planting and thinning, noxious weed control, and floodplain enhancements; 10 miles of stream were directly benefited with these riparian improvements. Four spring developments were constructed to enhance riparian and stream conditions by providing off stream livestock water sources. Nine spring developments and 1 reservoir were improved with fencing and/or piping to troughs to reduce sediment runoff and restore riparian habitat. Roads were closed or obliterated (8.5 miles) and road drainage was improved (3.4 miles) to reduce sediment delivery to streams. These nine projects cost approximately 1.3 million dollars to implement and monitor. BPA provided 41% of the funding, the remainder was cost shared by

  17. John Day Watershed Restoration Projects, annual report 2003.

    SciTech Connect

    Brown, Linda

    2004-01-01

    twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

  18. Exposure to bisphenol A (BPA) in Wistar rats reduces sperm quality with disruption of ERK signal pathway.

    PubMed

    Li, Juan; Mao, Rui; Zhou, Qin; Ding, Ling; Tao, Jin; Ran, Mao-Mei; Gao, Er-Sheng; Yuan, Wei; Wang, Jin-Tao; Hou, Li-Fang

    2016-03-01

    Bisphenol A (BPA) is an estrogenic environmental toxin widely used in the production of plastics and ubiquitous human exposure to this chemical has been proposed to be a potential risk to human health. Exposure to BPA can negatively impact sperm quality. However, the mechanism remains largely unknown. The objectives of this study were to assess the role of BPA on sperm quality and explore the possible mechanisms. The Wistar male rats (aged 28 days) were administered BPA by oral gavage for 28 days at dose of 50, 100 and 200 mg/kg/day; meanwhile, the negative control with corn oil (0 mg/kg/day BPA) and positive control with E2 at the dose of 100 μg/kg/day. The sperm density, sperm activity and sperm survival rate were analyzed byCASA system, and the sperm abnormality rate was analyzed by improved Papanicolaou stained. The protein expression levels of Src/p-Src, ERK1/2, p-ERK1/2 and CREB/p-CREB were detected by Western bolt. The results showed that the body weight gain, testes weight, testis coefficient, sperm density, sperm activity, sperm survival rate and protein expression levels of p-ERK1, p-ERK2 and p-CREB decreased, but the sperm abnormality rate increased with increasing BPA concentrations. There were positive correlations between sperm density, sperm activity and sperm survival rate with protein expression levels of p-ERK1, p-ERK2 and p-CREB, and negative correlations between sperm abnormality rate with the protein expression levels of p-ERK1, p-ERK2 and p-CREB. Results from the structural equation model demonstrated that BPA retained a significant negative effect to p-ERK, whereas p-ERK retained a significant positive effect to sperm quality and acted as the mediate variable. This study provides a novel insight regarding the potential role of p-ERK1 and p-ERK2 protein kinase on reproductive toxicity of BPA. The adverse effects of BPA on adult male sperm quality may be through the induction of the disruption of ERK signal pathway. However, additional

  19. Temporal trends in bisphenol A exposure in the United States from 2003-2012 and factors associated with BPA exposure: Spot samples and urine dilution complicate data interpretation.

    PubMed

    LaKind, Judy S; Naiman, Daniel Q

    2015-10-01

    Nationally representative data on urinary levels of BPA and its metabolites in the United States from the 2003-2004 to 2011-2012 National Health and Nutrition Examination Surveys (NHANES) were used to estimate daily BPA intakes and examine temporal trends. Additionally, NHANES data on lifestyle/demographic/dietary factors previously reported to be associated with BPA exposures were examined to assess the resiliency of the reported associations (whether the association is maintained across the five surveys). Finally, various approaches for addressing issues with the use of BPA concentration data from spot urine samples were examined for their effect on trends and associations. Three approaches were assessed here: (i) use of generic literature-based 24-h urine excretion volumes, (ii) use of creatinine adjustments, and (iii) use of individual urine flow rate data from NHANES. Based on 2011-2012 NHANES urinary BPA data and assumptions described in this paper, the median daily intake for the overall population is approximately 25 ng/kg day; median intake estimates were approximately two to three orders of magnitude below current health-based guidance values. Estimates of daily BPA intake have decreased significantly compared to those from the 2003-2004 NHANES. Estimates of associations between lifestyle/demographic/dietary factors and BPA exposure revealed inconsistencies related to both NHANES survey year and the three approaches listed above; these results demonstrate the difficulties in interpreting urinary BPA data, despite efforts to account for urine dilution and translation of spot sample data to 24-h data. The results further underscore the importance of continued research on how to best utilize urinary measures of environmental chemicals in exposure research. Until a consensus is achieved regarding the best biomonitoring approaches for assessing exposures to short-lived chemicals using urine samples, research on factors associated with BPA exposures should

  20. Bacterial Proteasome Activator Bpa (Rv3780) Is a Novel Ring-Shaped Interactor of the Mycobacterial Proteasome

    PubMed Central

    Delley, Cyrille L.; Laederach, Juerg; Ziemski, Michal; Bolten, Marcel; Boehringer, Daniel; Weber-Ban, Eilika

    2014-01-01

    The occurrence of the proteasome in bacteria is limited to the phylum of actinobacteria, where it is maintained in parallel to the usual bacterial compartmentalizing proteases. The role it plays in these organisms is still not fully understood, but in the human pathogen Mycobacterium tuberculosis (Mtb) the proteasome supports persistence in the host. In complex with the ring-shaped ATPase Mpa (called ARC in other actinobacteria), the proteasome can degrade proteins that have been post-translationally modified with the prokaryotic ubiquitin-like protein Pup. Unlike for the eukaryotic proteasome core particle, no other bacterial proteasome interactors have been identified to date. Here we describe and characterize a novel bacterial proteasome activator of Mycobacterium tuberculosis we termed Bpa (Rv3780), using a combination of biochemical and biophysical methods. Bpa features a canonical C-terminal proteasome interaction motif referred to as the HbYX motif, and its orthologs are only found in those actinobacteria encoding the proteasomal subunits. Bpa can inhibit degradation of Pup-tagged substrates in vitro by competing with Mpa for association with the proteasome. Using negative-stain electron microscopy, we show that Bpa forms a ring-shaped homooligomer that can bind coaxially to the face of the proteasome cylinder. Interestingly, Bpa can stimulate the proteasomal degradation of the model substrate β-casein, which suggests it could play a role in the removal of non-native or damaged proteins. PMID:25469515

  1. The Effect of a Health Communication Campaign on Compliance with Mass Drug Administration for Schistosomiasis Control in Western Kenya—The SCORE Project

    PubMed Central

    Omedo, Martin; Ogutu, Michael; Awiti, Alphonce; Musuva, Rosemary; Muchiri, Geoffrey; Montgomery, Susan P.; Secor, W. Evan; Mwinzi, Pauline

    2014-01-01

    Compliance with mass drug administration (MDA) can be affected by rumors and mistrust about the drug. Communication campaigns are an effective way to influence attitudes and health behaviors in diverse public health contexts, but there is very little documentation about experiences using health communications in schistosomiasis control programs. A qualitative study was conducted with community health workers (CHWs) as informants to explore the effect of a health communication campaign on their experiences during subsequent praziquantel MDA for schistosomiasis. Discussions were audio-recorded, transcribed verbatim, translated into English where applicable, and analyzed thematically using ATLAS.ti software. According to the CHWs, exposure to mass media messages improved awareness of the MDA, which in turn, led to better treatment compliance. Our findings suggest that communication campaigns influence health behaviors and create awareness of schistosomiasis control interventions, which may ultimately improve praziquantel MDA. PMID:25246690

  2. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  3. Project Success.

    ERIC Educational Resources Information Center

    Meredith, Larry D.

    Project Success consists of after-school, weekend, and summer educational programs geared toward minority and disadvantaged students to increase their numbers seeking postsecondary education from the Meadville, Pennsylvania area. The project is funded primarily through the Edinboro University of Pennsylvania, whose administration is committed to…

  4. 8. DETAIL INTERIOR VIEW OF LOBBY IN ADMINISTRATION BUILDING; FRONT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. DETAIL INTERIOR VIEW OF LOBBY IN ADMINISTRATION BUILDING; FRONT DOOR IS ON RIGHT. - Bonneville Project, Administration Building, South side of main entrance, Bonneville Project, Bonneville, Multnomah County, OR

  5. 6. DETAIL INTERIOR VIEW OF LOBBY IN ADMINISTRATION BUILDING; FRONT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. DETAIL INTERIOR VIEW OF LOBBY IN ADMINISTRATION BUILDING; FRONT DOOR IS IN CENTER BACKGROUND. - Bonneville Project, Administration Building, South side of main entrance, Bonneville Project, Bonneville, Multnomah County, OR

  6. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  7. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    SciTech Connect

    Volkman, Jed; Sexton, Amy D.

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  8. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect

    Volkman, Jed

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  9. Comparative study of the effect of BPA and its selected analogues on hemoglobin oxidation, morphological alterations and hemolytic changes in human erythrocytes.

    PubMed

    Maćczak, Aneta; Bukowska, Bożena; Michałowicz, Jaromir

    2015-01-01

    Bisphenol A (BPA) has been shown to provoke many deleterious impacts on human health, and thus it is now successively substituted by BPA analogues, whose effects have been poorly investigated. Up to now, only one study has been realized to assess the effect of BPA on human erythrocytes, which showed its significant hemolytic and oxidative potential. Moreover, no study has been conducted to evaluate the effect of BPA analogues on red blood cells. The purpose of the present study was to compare the impact of BPA and its selected analogues such as bisphenol F (BPF), bisphenol S (BPS) and bisphenol AF (BPAF) on hemolytic and morphological changes and hemoglobin oxidation (methemoglobin formation) of human erythrocytes. The erythrocytes were incubated with different bisphenols concentrations ranging from 0.5 to 500μg/ml for 1, 4 and 24h. The compounds examined caused hemolysis in human erythrocytes with BPAF exhibiting the strongest effect. All bisphenols examined caused methemoglobin formation with BPA inducing the strongest oxidative potential. Flow cytometry analysis showed that all bisphenols (excluding BPS) induced significant changes in erythrocytes size. Changes in red blood cells shape were conducted using phase contrast microscopy. It was noticed that BPA and BPAF induced echinocytosis, BPF caused stomatocytosis, while BPS did not provoke significant changes in shape of red blood cells. Generally, the results showed that BPS, which is the main substituent of bisphenol A in polymers and thermal paper production, exhibited significantly lower disturbance of erythrocyte functions than BPA. PMID:26232583

  10. EVALUATION OF ORAL AND INTRAVENOUS ROUTE PHARMACOKINETICS, PLASMA PROTEIN BINDING AND UTERINE TISSUE DOSE METRICS OF BPA: A PHYSIOLOGICALLY BASED PHARMACOKINETIC APPROACH

    EPA Science Inventory

    Bisphenol A (BPA) is a weakly estrogenic monomer used in the production of polycarbonate plastics and epoxy resins, both of which are used in food contact applications. A physiologically based pharmacokinetic (PBPK) model of BPA pharmacokinetics in rats and humans was developed t...

  11. Cu-PDC-bpa solid coordination frameworks (PDC=2,5-pyrindinedicarboxylate; bpa=1,2-DI(4-pyridil)ethane)): 2D and 3D structural flexibility producing a 3-c herringbone array next to ideal

    SciTech Connect

    Llano-Tomé, Francisco; Bazán, Begoña; Urtiaga, Miren-Karmele; Barandika, Gotzone; Antonia Señarís-Rodríguez, M.; and others

    2015-10-15

    Combination of polycarboxylate anions and dipyridyl ligands is an effective strategy to produce solid coordination frameworks (SCF) which are crystalline materials based on connections between metal ions through organic ligands. In this context, this work is focused on two novel Cu{sup II}-based SCFs exhibiting PDC (2,5-pyridinedicarboxylate) and bpa (1,2-di(4-pyridyl)ethane), being the first structures reported in literature containing both ligands. Chemical formula are [Cu{sub 2}[(PDC){sub 2}(bpa)(H{sub 2}O){sub 2}]·3H{sub 2}O·DMF (1), and [Cu{sub 2}(PDC){sub 2}(bpa)(H{sub 2}O){sub 2}]·7H{sub 2}O (2), where DMF is dimethylformamide. Compounds 1 and 2 have been characterized by means of X-ray diffraction (XRD), infrared spectroscopy (IR), thermogravimetric (TG) analysis, differential thermal analysis (DTA) and dielectric measurements. The crystallographic analysis revealed that compounds 1 and 2 can be described as herringbone-type layers formed by helicoidal Cu-PDC-Cu chains connected through bpa ligands. Solvent molecules are crystallized between the layers, providing the inter-layer connections through hydrogen bonds. Differences between both compounds are attributable to the flexibility of bpa (in 2D) as well as to the 3D packing of the layers which is solvent dependent. This fact results in the fact that compound 2 is the most regular 3-c herringbone array reported so far. The structural dynamism of these networks is responsible for the crystalline to-amorphous to-crystalline (CAC) transformation from compound 1 to compound 2. Crystallochemical features for both compounds have also been studied and compared to similar 3-connected herringbone-arrays. - Graphical abstract: Cu-PDC-bpa 3-c herringbone arrays. - Highlights: • The most ideal herringbone array reported so far is a Cu-PDC-bpa SCF. • Conformational freedom of bpa results in 2D and 3D flexibility of the SCFs. • The flexibility of the SCFs is related to a phase transformation. • Dielectric

  12. Reading Skills Achievement over Eight Administrations of the Achievement Monitoring Tests--Grades 2 and 5. Comparative Study of Phase IV IGE Evaluation Project. Phase IV, Project Paper 80-10.

    ERIC Educational Resources Information Center

    Nerenz, Anne G.

    This is one of a series of reports which provide definitions of and descriptive data on the variables used in the Comparative Study of Phase IV of the Individually Guided Education (IEG) Evaluation Project. Phase IV investigated three curriculum programs specifically designed to be compatible with instructional programming for the individual…

  13. Paternal BPA exposure in early life alters Igf2 epigenetic status in sperm and induces pancreatic impairment in rat offspring.

    PubMed

    Mao, Zhenxing; Xia, Wei; Chang, Huailong; Huo, Wenqian; Li, Yuanyuan; Xu, Shunqing

    2015-11-01

    Exposure to endocrine disruptors in utero appears to alter epigenetics in the male germ-line and subsequently promote adult-onset disease in subsequent generations. Fetal exposure to bisphenol A (BPA), a highly prevalent endocrine disruptor in environment, has been shown to alter epigenetic modification and result in glucose intolerance in adulthood. However, whether fetal exposure to BPA can induce epigenetic modification and phenotypic changes in their subsequent offspring are still unclear. The present study was designed to investigate whether exposure to BPA in early life induced glucose intolerance in the offspring through male germ line, and the underlying epigenetic molecular basis. F0 pregnant SD rats were received corn oil or 40 μg/kg/day of BPA during gestation and lactation. F1 male rats were maintained to generate F2 offspring by mating with untreated female rats. Both the F1 rats after weaning and the F2 offspring were not received any other treatments. Our results showed that male F2 offspring in the BPA group exhibited glucose intolerance and β-cell dysfunction. Decreased expression of Igf2 and associated hypermethylation of Igf2 were observed in islets of male F2 offspring. In addition, similar effects were observed in female F2 animals, but the effects were more pronounced in males. Moreover, abnormal expression and methylation of Igf2 was observed in sperm of adult F1 male rats, indicating that epigenetic modification in germ cells can be partly progressed to the next generation. Overall, our study suggests that BPA exposure during early life can result in generational transmission of glucose intolerance and β-cell dysfunction in the offspring through male germ line, which is associated with hypermethylation of Igf2 in islets. The changes of epigenetics in germ cells may contribute to this generational transmission. PMID:26276081

  14. Migration of bisphenol A (BPA) from epoxy can coatings to jalapeño peppers and an acid food simulant.

    PubMed

    Munguia-Lopez, Elvia M; Peralta, Elizabeth; Gonzalez-Leon, Alberto; Vargas-Requena, Claudia; Soto-Valdez, Herlinda

    2002-12-01

    Effects of heat processing, storage time, and temperature on migration of bisphenol A (BPA) from an epoxy type can coating to an acid food simulant and jalapeño peppers were determined. Commercial jalapeño pepper cans (8 oz, dimensions 211 x 300) were stored at 25 degrees C for 40, 70, and 160 days. A solution of 3% acetic acid was canned in 211 x 300 cans from the same batch used for jalapeño peppers. Heat processing was applied to two-thirds of the cans, and the remaining cans were not heat processed. Cans were stored at 25 and 35 degrees C for 0, 40, 70, and 160 days. Results showed that there is a minimal effect of heat treatment. An effect of storage time on migration of BPA during the first 40 days at 25 degrees C was observed. An increase on migration of BPA was observed with storage time at 35 degrees C. The highest level of migration was 15.33 microg/kg of BPA at 160 days at 35 degrees C. A correction factor of approximately 0.4 was calculated for migration under simulating conditions of storage compared to the real ones. The highest level of BPA found in jalapeño peppers cans, surveyed from three supermarkets, was 5.59 +/- 2.43 microg/kg. Migration of BPA, performed according to the European and Mercosur conditions, was 65.45 +/- 5.29 microg/kg. All the migration values found in this study were below those legislation limits (3 mg/kg). PMID:12452648

  15. F0 maternal BPA exposure induced glucose intolerance of F2 generation through DNA methylation change in Gck.

    PubMed

    Li, Gengqi; Chang, Huailong; Xia, Wei; Mao, Zhenxing; Li, Yuanyuan; Xu, Shunqing

    2014-08-01

    BPA, a common environmental endocrine disruptor, has been reported to induce epigenetic changes and disrupt glucose homeostasis in F1 offspring through maternal exposure. However, no studies have examined whether maternal BPA exposure can exert multigenerational effects of glucose metabolic disorder on F2 generation through the altered epigenetic information. The aim of the current study was to investigate whether BPA exposure can disrupt glucose homeostasis in F2 offspring and the underlying epigenetic mechanism. In the present study, F0 pregnant dams were orally administered at a daily dose of 40μg/kg body weight during gestation and lactation. The F1 and F2 generations were obtained and not exposed to BPA anymore. The glucose and insulin tolerance tests were carried out to evaluate the glucose homeostasis level. The relative hormone level and the relative gene expression were also examined. F2 generation was found to exhibited glucose intolerance and insulin resistance in ipGTT and ipITT, as well as the downregulation of glucokinase (Gck) gene in liver. DNA methylation pattern of Gck promoter in the F2 generation of hepatic tissue and F1 generation of sperm was then performed. The Gck promoter in F2 hepatic tissue became completely methylated in the all CpG sites compared with five unmethylated sites in controls. In the F1 sperm, the global DNA methylation was decreased. However, there is only CpG site -314 was differently methylated between BPA and controls in sperm. In conclusion, F0 maternal BPA exposure during gestation and lactation can induce impaired glucose homeostasis in the F2 offspring through the transmission of sperm. The underlying epigenetic modifications in the sperm of F1 generation remain to be further elucidated. PMID:24793715

  16. Measurements of 10B(p,a)7Be Cross-sections: A Reaction Relevant to Nuclear Fusion Energy Research

    NASA Astrophysics Data System (ADS)

    Fisher, Barbara; Kafkarkou, Adamos; Ahmed, Mohammad; Weller, Henry; Myers, Luke; Sparker, Mark; Zimmerman, William; Mueller, Jon; Sikora, Mark; Mazumdar, Indral

    2012-10-01

    There is growing interest in aneutronic nuclear fusion reactors. One facility proposes to utilize the 11B(p,a)7Be reaction. The Radiative Capture Group at Triangle University Nuclear Laboratory (TUNL) has been engaged in a long-term study of this and related reactions. This poster will present preliminary data and analysis of the 10B(p,a)7Be reaction which is of interest because 10B is a potential reactor contaminant. Differential and total cross-sections will be presented for incident protons of 4.4 and 4.6 MeV. The data is necessary for simulations of an aneutrionic nuclear fusion reactor.

  17. SIMS ion microscopy imaging of boronophenylalanine (BPA) and 13C15N-labeled phenylalanine in human glioblastoma cells: Relevance of subcellular scale observations to BPA-mediated boron neutron capture therapy of cancer

    NASA Astrophysics Data System (ADS)

    Chandra, Subhash; Lorey, Daniel R., II

    2007-02-01

    p-Boronophenylalanine (BPA) is a clinically approved boron neutron capture therapy (BNCT) agent currently being used in clinical trials of glioblastoma multiforme, melanoma and liver metastases. Secondary ion mass spectrometry (SIMS) observations from the Cornell SIMS Laboratory provided support for using a 6 h infusion of BPA, instead of a 2 h infusion, for achieving higher levels of boron in brain tumor cells. These observations were clinically implemented in Phase II experimental trials of glioblastoma multiforme in Sweden. However, the mechanisms for higher BPA accumulation with longer infusions have remained unknown. In this work, by using 13C15N-labeled phenylalanine and T98G human glioblastoma cells, comparisons between the 10B-delivery of BPA and the accumulation of labeled phenylalanine after 2 and 6 h treatments were made with a Cameca IMS-3f SIMS ion microscope at 500 nm spatial resolution in fast frozen, freeze-fractured, freeze-dried cells. Due to the presence of the Na-K-ATPase in the plasma membrane of most mammalian cells, the cells maintain an approximately 10/1 ratio of K/Na in the intracellular milieu. Therefore, the quantitative imaging of these highly diffusible species in the identical cell in which the boron or labeled amino acid was imaged provides a rule-of-thumb criterion for validation of SIMS observations and the reliability of the cryogenic sampling. The labeled phenylalanine was detected at mass 28, as the 28(13C15N)- molecular ion. Correlative analysis with optical and confocal laser scanning microscopy revealed that fractured freeze-dried glioblastoma cells contained well-preserved ultrastructural details with three discernible subcellular regions: a nucleus or multiple nuclei, a mitochondria-rich perinuclear cytoplasmic region and the remaining cytoplasm. SIMS analysis revealed that the overall cellular signals of both 10B from BPA and 28CN- from labeled phenylalanine increased approximately 1.6-fold between the 2 and 6 h exposures

  18. 44 CFR 206.395 - Grant administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Grant administration. (a) Project administration shall be in accordance with 44 CFR part 13, and applicable portions of subpart G, 44 CFR part 206. (b) In those instances in which reimbursement includes... Administrator shall coordinate with other Federal programs to preclude any duplication of payments. (See 44...

  19. 44 CFR 206.395 - Grant administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Grant administration. (a) Project administration shall be in accordance with 44 CFR part 13, and applicable portions of subpart G, 44 CFR part 206. (b) In those instances in which reimbursement includes... Administrator shall coordinate with other Federal programs to preclude any duplication of payments. (See 44...

  20. 44 CFR 206.395 - Grant administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Grant administration. (a) Project administration shall be in accordance with 44 CFR part 13, and applicable portions of subpart G, 44 CFR part 206. (b) In those instances in which reimbursement includes... Administrator shall coordinate with other Federal programs to preclude any duplication of payments. (See 44...

  1. 44 CFR 206.395 - Grant administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Grant administration. (a) Project administration shall be in accordance with 44 CFR part 13, and applicable portions of subpart G, 44 CFR part 206. (b) In those instances in which reimbursement includes... Administrator shall coordinate with other Federal programs to preclude any duplication of payments. (See 44...

  2. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  3. Preliminary Design Report for the Yakima/Klickitat Production Project; Executive Summary.

    SciTech Connect

    US Bonneville Power Administration.

    1990-03-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Agreement on a refined statement of project goals. Completion of a technical analysis of water supplies. Completion of an experimental design plan. Development of a harvest management plan. Assessment of potential genetic risks. Project coordination with all other affected parties. Submission of a preliminary design report to the Council. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  4. Rock Creek Tower Painting Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1988-10-01

    Bonneville Power Administration (BPA) built a 500-kV line across Rock Creek, a Class I trout stream about 20 miles east of Missoula, MT. Two 190-foot towers rise on either side of the Rock Creek valley, and the line between is suspended 600 feet over the valley floor. The crossing poses a hazard to passing airplanes and disrupts the natural landscape. The area where the line crosses Rock Creek is prized for its scenic beauty. In response to public demand that BPA protect the visual beauty of this area, BPA painted the towers gray to blend them best in with their natural surroundings. The issue now is to decide between either two gray towers or two orange-and-white towers. The underlying need is to resolve the conflict of pilot safety against scenic intrusion. The proposed action is to paint the gray tower aeronautical orange and white. Alternatives are to paint the orange-and-white tower back to its original gray; or leave the dilemma unresolved (the ''no-action'' alternative). 9 refs., 3 figs.

  5. Is container type the biggest predictor of trace element and BPA leaching from drinking water bottles?

    PubMed

    Rowell, Candace; Kuiper, Nora; Preud'Homme, Hugues

    2016-07-01

    The knowledge-base of bottled water leachate is highly contradictory due to varying methodologies and limited multi-elemental and/or molecular analyses; understanding the range of contaminants and their pathways is required. This study determined the leaching potential and leaching kinetics of trace elements, using consistent comprehensive quantitative and semi-quantitative (79 elements total) analyses, and BPA, using isotopic dilution and MEPS pre-concentration with UHPLC-ESI-QTOF. Statistical methods were used to determine confounders and predictors of leaching and human health risk throughout 12days of UV exposure and after exposure to elevated temperature. Various types of water were used to assess the impact of water quality. Results suggest Sb leaching is primarily dependent upon water quality, not container type. Bottle type is a predictor of elemental leaching for Pb, Ba, Cr, Cu, Mn and Sr; BPA was detected in samples from polycarbonate containers. Health risks from the consumption of bottled water increase after UV exposure. PMID:26920269

  6. Project: "Project!"

    ERIC Educational Resources Information Center

    Grayson, Katherine

    2007-01-01

    In November 2006, the editors of "Campus Technology" launched their first-ever High-Resolution Projection Study, to find out if the latest in projector technology could really make a significant difference in teaching, learning, and educational innovation on US campuses. The author and her colleagues asked campus educators, technologists, and…

  7. Mechanistic study of photo-oxidation of Bisphenol-A (BPA) with hydrogen peroxide (H2O2) and sodium persulfate (SPS).

    PubMed

    Sharma, Jyoti; Mishra, I M; Kumar, Vineet

    2016-01-15

    The removal of Bisphenol-A (BPA) from contaminated water using advanced oxidation methods such as UV-C assisted oxidation by hydrogen peroxide (H2O2) and sodium persulfate (SPS) has been reported by the authors earlier (Sharma et al., 2015a). In the present study, the authors report the removal of BPA from aqueous solution by the above two methods and its degradation mechanism. UV-C light (254 nm wavelength, 40 W power) was applied to BPA contaminated water at natural pH (pHN) under room temperature conditions. Experiments were carried out with the initial BPA concentration in the range of 0.04 mM-0.31 mM and the oxidant/BPA molar ratio in the range of 294:1-38:1 for UV-C/H2O2 and 31.5-4.06:1 for UV-C/SPS systems. The removal of BPA enhanced with decreasing BPA concentration. The total organic carbon also decreased with the UV-C irradiation time under optimum conditions ([H2O2]0 = 11.76 mM; [SPS]0 = 1.26 mM; temperature (29 ± 3 °C). Competition of BPA for reaction with HO or [Formula: see text] radicals at its higher concentrations results in a decrease in the removal of BPA. The intermediates with smaller and higher molecular weights than that of BPA were found in the treated water. Based on GC-MS and FTIR spectra of the reaction mixture, the formation of hydroxylated by-products testified the HO mediated oxidation pathway in the BPA degradation, while the formation of quinones and phenoxy phenols pointed to the [Formula: see text] dominating pathway through the formation of hydroxycyclohexadienyl (HCHD) and BPA phenoxyl radicals. The main route of BPA degradation is the hydroxylation followed by dehydration, coupling and ring opening reactions. PMID:26468603

  8. The DOE Wide Area Measurement System (WAMS) Project: Demonstration of dynamic information technology for the future power system

    SciTech Connect

    Mittelstadt, W.A.; Krause, P.E.; Wilson, R.E.; Overholt, P.N.; Sobajic, D.J.; Hauer, J.F.; Rizy, D.T.

    1996-07-01

    In 1989 the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands, in an environment where increased competition, a wider range of services and vendors, and much narrower operating margins all contribute to increased system efficiencies and capacity. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment--the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI). The WAMS project also brings added focus and resources to the evolving Western System Dynamic Information Network, or WesDINet. This is a collective response of the Western Systems Coordinating Council (WSCC) member utilities to their shared needs for direct information about power system characteristics, model fidelity, and operational performance. The WAMS project is a key source of the technology and backbone communications needed to make WesDINet a well integrated, cost effective enterprise network demonstrating the role of dynamic information technology in the emerging utility environment.

  9. Androgen and Progesterone Receptors Are Targets for Bisphenol A (BPA), 4-Methyl-2,4-bis-(P-Hydroxyphenyl)Pent-1-Ene—A Potent Metabolite of BPA, and 4-Tert-Octylphenol: A Computational Insight

    PubMed Central

    Rehan, Mohd; Ahmad, Ejaz; Sheikh, Ishfaq A.; Abuzenadah, Adel M.; Damanhouri, Ghazi A.; Bajouh, Osama S.; AlBasri, Samera F.; Assiri, Mansour M.; Beg, Mohd A.

    2015-01-01

    Exposure to toxic industrial chemicals that have capacity to disrupt the endocrine system, also known as endocrine disrupting chemicals (EDCs), has been increasingly associated with reproductive problems in human population. Bisphenol A (BPA; 4,4'-(propane-2,2-diyl)diphenol) and 4-tert-octylphenol (OP; 4-(1,1,3,3-tetramethylbutyl)phenol) are among the most common environmental contaminants possessing endocrine disruption properties and are present in plastics, epoxy resins, detergents and other commercial products of common personal and industrial use. A metabolite of BPA, 4-Methyl-2,4-bis(4-hydroxyphenyl)pent-1-ene (MBP) is about 1000 times more biologically active compared to BPA. Epidemiological, clinical, and experimental studies have shown association of BPA and OP with adverse effects on male and female reproductive system in human and animals. The endocrine disruption activity can occur through multiple pathways including binding to steroid receptors. Androgen receptor (AR) and progesterone receptor (PR) are critical for reproductive tract growth and function. Structural binding characterization of BPA, MBP, and OP with AR and PR using molecular docking simulation approaches revealed novel interactions of BPA with PR, and MBP and OP with AR and PR. For BPA, MBP, and OP, five AR interacting residues Leu-701, Leu-704, Asn-705, Met-742, and Phe-764 overlapped with those of native AR ligand testosterone, and four PR interacting residues Leu-715, Leu-718, Met-756, and Met-759 overlapped with those of PR co-complex ligand, norethindrone. For both the receptors the binding strength of MBP was maximum among the three compounds. Thus, these compounds have the potential to block or interfere in the binding of the endogenous native AR and PR ligands and, hence, resulting in dysfunction. The knowledge of the key interactions and the important amino-acid residues also allows better prediction of potential of xenobiotic molecules for disrupting AR- and PR

  10. Ashland Area Support Substation Project

    SciTech Connect

    Not Available

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  11. Cu-PDC-bpa solid coordination frameworks (PDC=2,5-pyrindinedicarboxylate; bpa=1,2-DI(4-pyridil)ethane)): 2D and 3D structural flexibility producing a 3-c herringbone array next to ideal

    NASA Astrophysics Data System (ADS)

    Llano-Tomé, Francisco; Bazán, Begoña; Urtiaga, Miren-Karmele; Barandika, Gotzone; Antonia Señarís-Rodríguez, M.; Sánchez-Andújar, Manuel; Arriortua, María-Isabel

    2015-10-01

    Combination of polycarboxylate anions and dipyridyl ligands is an effective strategy to produce solid coordination frameworks (SCF) which are crystalline materials based on connections between metal ions through organic ligands. In this context, this work is focused on two novel CuII-based SCFs exhibiting PDC (2,5-pyridinedicarboxylate) and bpa (1,2-di(4-pyridyl)ethane), being the first structures reported in literature containing both ligands. Chemical formula are [Cu2[(PDC)2(bpa)(H2O)2]·3H2O·DMF (1), and [Cu2(PDC)2(bpa)(H2O)2]·7H2O (2), where DMF is dimethylformamide. Compounds 1 and 2 have been characterized by means of X-ray diffraction (XRD), infrared spectroscopy (IR), thermogravimetric (TG) analysis, differential thermal analysis (DTA) and dielectric measurements. The crystallographic analysis revealed that compounds 1 and 2 can be described as herringbone-type layers formed by helicoidal Cu-PDC-Cu chains connected through bpa ligands. Solvent molecules are crystallized between the layers, providing the inter-layer connections through hydrogen bonds. Differences between both compounds are attributable to the flexibility of bpa (in 2D) as well as to the 3D packing of the layers which is solvent dependent. This fact results in the fact that compound 2 is the most regular 3-c herringbone array reported so far. The structural dynamism of these networks is responsible for the crystalline to-amorphous to-crystalline (CAC) transformation from compound 1 to compound 2. Crystallochemical features for both compounds have also been studied and compared to similar 3-connected herringbone-arrays.

  12. Evidence for Steric Regulation of Fibrinogen Binding to Staphylococcus aureus Fibronectin-binding Protein A (FnBPA)*

    PubMed Central

    Stemberk, Vaclav; Jones, Richard P. O.; Moroz, Olga; Atkin, Kate E.; Edwards, Andrew M.; Turkenburg, Johan P.; Leech, Andrew P.; Massey, Ruth C.; Potts, Jennifer R.

    2014-01-01

    The adjacent fibrinogen (Fg)- and fibronectin (Fn)-binding sites on Fn-binding protein A (FnBPA), a cell surface protein from Staphylococcus aureus, are implicated in the initiation and persistence of infection. FnBPA contains a single Fg-binding site (that also binds elastin) and multiple Fn-binding sites. Here, we solved the structure of the N2N3 domains containing the Fg-binding site of FnBPA in the apo form and in complex with a Fg peptide. The Fg binding mechanism is similar to that of homologous bacterial proteins but without the requirement for “latch” strand residues. We show that the Fg-binding sites and the most N-terminal Fn-binding sites are nonoverlapping but in close proximity. Although Fg and a subdomain of Fn can form a ternary complex on an FnBPA protein construct containing a Fg-binding site and single Fn-binding site, binding of intact Fn appears to inhibit Fg binding, suggesting steric regulation. Given the concentrations of Fn and Fg in the plasma, this mechanism might result in targeting of S. aureus to fibrin-rich thrombi or elastin-rich tissues. PMID:24627488

  13. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.

    SciTech Connect

    Shaw, R.Todd

    1996-05-01

    During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

  14. Pend Oreille Wetlands Wildlife Mitigation Project Management Plan for the "Dilling Addition".

    SciTech Connect

    Entz, Ray D.

    1999-01-15

    This report is a recommendation from the Kalispel Tribe to the Bonneville Power Administration (BPA) and the Columbia Basin Fish and Wildlife Authority (CBFWA) for management of the Pend Oreille Wetland Wildlife Mitigation project II (Dilling Addition) for the extensive habitat losses caused by Albeni Falls Dam on Kalispel Ceded Lands. Albeni Falls Dam is located on the Pend Oreille River near the Washington-Idaho border, about 25 miles upstream of the Kalispel Indian Reservation. The dam controls the water level on Lake Pend Oreille. The lake was formerly the center of subsistence use by the Kalispel Tribe. Flooding of wetlands, and water fluctuations both on the lake and downstream on the river, has had adverse impacts to wildlife and wildlife habitat. An extensive process was followed to formulate and prioritize wildlife resource goals. The Kalispel Natural Resource Department provided guidance in terms of opportunities onsite. To prioritize specific goals, the Albeni Falls Interagency Work Group and the Columbia Basin Fish and Wildlife Authority Wildlife Caucus were consulted. From this process, the top priority goal for the Kalispel Tribe is: Protect and develop riparian forest and shrub, and freshwater wetlands, to mitigate losses resulting from reservoir inundation and river level fluctuations due to Albeni Falls Dam. Indicator species used to determine the initial construction/inundation loses and mitigation project gains include Bald Eagle (breeding and wintering), Black-capped Chickadee, Canada Goose, Mallard, muskrat, white-tailed deer, and Yellow Warbler.

  15. In utero and peripubertal exposure to phthalates and BPA in relation to female sexual maturation.

    PubMed

    Watkins, Deborah J; Téllez-Rojo, Martha Maria; Ferguson, Kelly K; Lee, Joyce M; Solano-Gonzalez, Maritsa; Blank-Goldenberg, Clara; Peterson, Karen E; Meeker, John D

    2014-10-01

    The age of pubertal onset for girls has declined over past decades. Research suggests that endocrine disrupting chemicals (EDCs) may play a role but exposure at multiple stages of development has not been considered. We examined in utero and peripubertal exposure to bisphenol-A (BPA) and phthalates in relation to serum hormones and sexual maturation among females in a Mexico City birth cohort. We measured phthalate metabolite and BPA concentrations in urine collected from mothers during their third trimester (n=116) and from their female children at ages 8-13 years (n=129). Among girls, we measured concurrent serum hormone concentrations, Tanner stages for breast and pubic hair development, and collected information on menarche onset. We used linear and logistic regression to model associations between in utero and peripubertal measures of exposure with hormones and sexual maturation, respectively, controlling for covariates. An interquartile range (IQR) increase in in utero urinary mono-2-ethylhexyl phthalate (MEHP) was positively associated with 29% (95% CI: 9.2-52.6%) higher dehydroepiandrosterone sulfate (DHEA-S), an early indicator of adrenarche, and 5.3 (95% CI: 1.13-24.9) times higher odds of a Tanner stage >1 for pubic hair development. Similar relationships were observed with other in utero but not peripubertal di-2-ethylhexyl phthalate (DEHP) metabolites. IQR increases in in utero monobenzyl phthalate (MBzP) and monoethyl phthalate (MEP) were associated with 29% and 25% higher serum testosterone concentrations (95% CI: 4.3-59.3; 2.1-54.1), respectively. In addition, we observed suggestive associations between in utero and peripubertal MEP concentrations and increased odds of having undergone menarche, and between peripubertal MnBP concentrations and increased odds of having a Tanner stage >1 for both breast and pubic hair development. BPA was not associated with in utero or peripubertal serum hormones or sexual maturation. Our findings suggest in utero

  16. TMACS Test Procedure TP007: System administration

    SciTech Connect

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  17. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  18. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    SciTech Connect

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  19. Contract Administration: Understanding Limitations on Management Rights. A Presenter's Guide. Research Based Training for School Administrators.

    ERIC Educational Resources Information Center

    Oregon Univ., Eugene. Center for Educational Policy and Management.

    This workshop presenter's guide is intended for use by administrators in training one another in the Project Leadership program developed by the Association of California School Administrators (ACSA). The purpose of this particular guide is to train administrators to interpret common contract provisions that affect management's decision-making…

  20. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    SciTech Connect

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  1. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    SciTech Connect

    Contor, Craig R.; Harris, Robin; King, Marty

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  2. Kootenai River White Sturgeon Conservation Aquaculture Project : Environmental Assessment.

    SciTech Connect

    US Bonneville Power Administration; Kootenai Tribe of Idaho

    1997-04-01

    Bonneville Power Administration (BPA) is responding to the need to prevent the extinction of the Kootenai River white sturgeon (Acipenser transmontanus) between Libby Dam in Montana and Corra Linn Dam in British Columbia. Construction and operation of Libby Dam altered the natural flow of the Kootenai River, especially the normal May-to-July flows needed for natural reproduction and recruitment. It also affected the river`s biological productivity and the quality of spawning and rearing habitat. As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), BPA must mitigate for losses of fish and wildlife (including related spawning grounds and habitat) that are attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries.

  3. Pine Hollow Watershed Project : FY 2000 Projects.

    SciTech Connect

    Sherman County Soil and Water Conservation District

    2001-06-01

    The Pine Hollow Project (1999-010-00) is an on-going watershed restoration effort administered by Sherman County Soil and Water Conservation District and spearheaded by Pine Hollow/Jackknife Watershed Council. The headwaters are located near Shaniko in Wasco County, and the mouth is in Sherman County on the John Day River. Pine Hollow provides more than 20 miles of potential summer steelhead spawning and rearing habitat. The watershed is 92,000 acres. Land use is mostly range, with some dryland grain. There are no water rights on Pine Hollow. Due to shallow soils, the watershed is prone to rapid runoff events which scour out the streambed and the riparian vegetation. This project seeks to improve the quality of upland, riparian and in-stream habitat by restoring the natural hydrologic function of the entire watershed. Project implementation to date has consisted of construction of water/sediment control basins, gradient terraces on croplands, pasture cross-fences, upland water sources, and grass seeding on degraded sites, many of which were crop fields in the early part of the century. The project is expected to continue through about 2007. From March 2000 to June 2001, the Pine Hollow Project built 6 sediment basins, 1 cross-fence, 2 spring developments, 1 well development, 1 solar pump, 50 acres of native range seeding and 1 livestock waterline. FY2000 projects were funded by BPA, Oregon Watershed Enhancement Board, US Fish and Wildlife Service and landowners. In-kind services were provided by Sherman County Soil and Water Conservation District, USDA Natural Resources Conservation Service, USDI Bureau of Land Management, Oregon Department of Fish and Wildlife, Pine Hollow/Jackknife Watershed Council, landowners and Wasco County Soil and Water Conservation District.

  4. Sensitivity and selectivity determination of BPA in real water samples using PAMAM dendrimer and CoTe quantum dots modified glassy carbon electrode.

    PubMed

    Yin, Huanshun; Zhou, Yunlei; Ai, Shiyun; Chen, Quanpeng; Zhu, Xiangbin; Liu, Xianggang; Zhu, Lusheng

    2010-02-15

    Bisphenol A (BPA) is an environmental pollutant to disrupt endocrine system or cause cancer, thus the detection of BPA is very important. Herein, an amperometric sensor was fabricated based on immobilized CoTe quantum dots (CoTe QDs) and PAMAM dendrimer (PAMAM) onto glassy carbon electrode (GCE) surface. The cyclic voltammogram of BPA on the sensor exhibited a well-defined anodic peak at 0.490V in 0.1M pH 8.0 PBS. The determination conditions were optimized and the kinetic parameters were calculated. The linear range was 1.3 x 10(-8) to 9.89 x 10(-6)M with the correlation coefficient of 0.9999. The limit of detection was estimated to be 1 x 10(-9)M. The current reached the steady-state current within about 5s. Furthermore, the fabricated sensor was successfully applied to determine BPA in real water samples. PMID:19782469

  5. First-principles study for the adsorption of segments of BPA-PC on α-Al2O3(0001)

    NASA Astrophysics Data System (ADS)

    Blomqvist, Janne; Salo, Petri

    2011-10-01

    We have studied the adsorption of bisphenol-A-polycarbonate (BPA-PC) on the α-Al2O3(0001) surface using density functional theory (DFT) with van der Waals (vdW) corrections. The BPA-PC polymer can be divided into its chemical fragments, which are phenylene, carbonate, and isopropylidene groups. We have calculated the adsorption energy and geometry of the BPA-PC segments that consist of two to three adjacent groups of the polymer. Our DFT results show that the adsorption is dominated by the vdW interaction. It is also important to include the interaction of nearest-neighbor groups in order to provide a realistic environment for the adsorption of the polymer onto the surface. Our results also show that the BPA-PC molecule attaches to the alumina surface via the carbonate group located in the middle of the molecule chain.

  6. Developmental Bisphenol A (BPA) Exposure Leads to Sex-specific Modification of Hepatic Gene Expression and Epigenome at Birth that May Exacerbate High-fat Diet-induced Hepatic Steatosis

    PubMed Central

    Strakovsky, Rita S.; Wang, Huan; Engeseth, Nicki J.; Flaws, Jodi A.; Helferich, William G.; Pan, Yuan-Xiang; Lezmi, Stéphane

    2015-01-01

    Developmental bisphenol A (BPA) exposure increases adulthood hepatic steatosis with reduced mitochondrial function. To investigate potential epigenetic mechanisms behind developmental BPA-induced hepatic steatosis, pregnant Sprague-Dawley rats were dosed with vehicle (oil) or BPA (100 μg/kg/day) from gestational day 6 until postnatal day (PND) 21. After weaning, offspring were either challenged with a high-fat (HF; 45% fat) or remained on a control (C) diet until PND110. From PND60 to 90, both BPA and HF diet increased the fat/lean ratio in males only, and the combination of BPA and HF diet appeared to cause the highest ratio. On PND110, Oil-HF, BPA-C, and BPA-HF males had higher hepatic lipid accumulation than Oil-C, with microvesicular steatosis being marked in the BPA-HF group. Furthermore, on PND1, BPA increased and modified hepatic triglycerides (TG) and free fatty acid (FFA) composition in males only. In PND1 males, BPA increased hepatic expression of FFA uptake gene Fat/Cd36, and decreased the expression of TG synthesis- and β-oxidation-related genes (Dgat, Agpat6, Cebpα, Cebpβ, Pck1, Acox1, Cpt1a, Cybb). BPA altered DNA methylation, histone marks (H3Ac, H4Ac, H3Me2K4, H3Me3K36), and decreased the binding of several transcription factors (Pol II, C/EBPβ, SREBP1) within the male Cpt1a gene, the key β-oxidation enzyme. In PND1 females, BPA only increased the expression of genes involved in FFA uptake and TG synthesis (Lpl, Fasn, and Dgat). These data suggest that developmental BPA exposure alters and reprograms hepatic β-oxidation capacity in males, potentially thorough the epigenetic regulation of genes, and further alters the response to a HF diet. PMID:25748669

  7. Developmental bisphenol A (BPA) exposure leads to sex-specific modification of hepatic gene expression and epigenome at birth that may exacerbate high-fat diet-induced hepatic steatosis.

    PubMed

    Strakovsky, Rita S; Wang, Huan; Engeseth, Nicki J; Flaws, Jodi A; Helferich, William G; Pan, Yuan-Xiang; Lezmi, Stéphane

    2015-04-15

    Developmental bisphenol A (BPA) exposure increases adulthood hepatic steatosis with reduced mitochondrial function. To investigate the potential epigenetic mechanisms behind developmental BPA-induced hepatic steatosis, pregnant Sprague-Dawley rats were dosed with vehicle (oil) or BPA (100μg/kg/day) from gestational day 6 until postnatal day (PND) 21. After weaning, offspring were either challenged with a high-fat (HF; 45% fat) or remained on a control (C) diet until PND110. From PND60 to 90, both BPA and HF diet increased the fat/lean ratio in males only, and the combination of BPA and HF diet appeared to cause the highest ratio. On PND110, Oil-HF, BPA-C, and BPA-HF males had higher hepatic lipid accumulation than Oil-C, with microvesicular steatosis being marked in the BPA-HF group. Furthermore, on PND1, BPA increased and modified hepatic triglyceride (TG) and free fatty acid (FFA) compositions in males only. In PND1 males, BPA increased hepatic expression of FFA uptake gene Fat/Cd36, and decreased the expression of TG synthesis- and β-oxidation-related genes (Dgat, Agpat6, Cebpα, Cebpβ, Pck1, Acox1, Cpt1a, Cybb). BPA altered DNA methylation and histone marks (H3Ac, H4Ac, H3Me2K4, H3Me3K36), and decreased the binding of several transcription factors (Pol II, C/EBPβ, SREBP1) within the male Cpt1a gene, the key β-oxidation enzyme. In PND1 females, BPA only increased the expression of genes involved in FFA uptake and TG synthesis (Lpl, Fasn, and Dgat). These data suggest that developmental BPA exposure alters and reprograms hepatic β-oxidation capacity in males, potentially through the epigenetic regulation of genes, and further alters the response to a HF diet. PMID:25748669

  8. Senior Administrators Should Have Administrative Contracts.

    ERIC Educational Resources Information Center

    Posner, Gary J.

    1987-01-01

    Recognizing that termination is viewed by the employee as the equivalent to capital punishment of a career, an administrative contract can reduce the emotional and financial entanglements that often result. Administrative contracts are described. (MLW)

  9. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2002-2003.

    SciTech Connect

    Vaivoda, Alexis

    2004-02-01

    This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts, personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water

  10. Novice Administrators: Personality and Administrative Style Changes.

    ERIC Educational Resources Information Center

    Schmidt, Linda J.; Kosmoski, Georgia J.; Pollack, Dennis R.

    Since the advent of effective-schools research findings, educational administration experts have advocated a democratic and collegial leadership style for school administrators. This paper provides the findings of a study that examined 43 beginning administrators (25 females, 32 Caucasians, 9 African-Americans, 2 Hispanics) to determine what…

  11. Tualang Honey Protects against BPA-Induced Morphological Abnormalities and Disruption of ERα, ERβ, and C3 mRNA and Protein Expressions in the Uterus of Rats

    PubMed Central

    Mohamad Zaid, Siti Sarah; Kassim, Normadiah M.; Othman, Shatrah

    2015-01-01

    Bisphenol A (BPA) is an endocrine disrupting chemical (EDC) that can disrupt the normal functions of the reproductive system. The objective of the study is to investigate the potential protective effects of Tualang honey against BPA-induced uterine toxicity in pubertal rats. The rats were administered with BPA by oral gavage over a period of six weeks. Uterine toxicity in BPA-exposed rats was determined by the degree of the morphological abnormalities, increased lipid peroxidation, and dysregulated expression and distribution of ERα, ERβ, and C3 as compared to the control rats. Concurrent treatment of rats with BPA and Tualang honey significantly improved the uterine morphological abnormalities, reduced lipid peroxidation, and normalized ERα, ERβ, and C3 expressions and distribution. There were no abnormal changes observed in rats treated with Tualang honey alone, comparable with the control rats. In conclusion, Tualang honey has potential roles in protecting the uterus from BPA-induced toxicity, possibly accounted for by its phytochemical properties. PMID:26788107

  12. Developmental bisphenol A (BPA) exposure leads to sex-specific modification of hepatic gene expression and epigenome at birth that may exacerbate high-fat diet-induced hepatic steatosis

    SciTech Connect

    Strakovsky, Rita S.; Wang, Huan; Engeseth, Nicki J.; Flaws, Jodi A.; Helferich, William G.; Pan, Yuan-Xiang; Lezmi, Stéphane

    2015-04-15

    Developmental bisphenol A (BPA) exposure increases adulthood hepatic steatosis with reduced mitochondrial function. To investigate the potential epigenetic mechanisms behind developmental BPA-induced hepatic steatosis, pregnant Sprague–Dawley rats were dosed with vehicle (oil) or BPA (100 μg/kg/day) from gestational day 6 until postnatal day (PND) 21. After weaning, offspring were either challenged with a high-fat (HF; 45% fat) or remained on a control (C) diet until PND110. From PND60 to 90, both BPA and HF diet increased the fat/lean ratio in males only, and the combination of BPA and HF diet appeared to cause the highest ratio. On PND110, Oil-HF, BPA-C, and BPA-HF males had higher hepatic lipid accumulation than Oil-C, with microvesicular steatosis being marked in the BPA-HF group. Furthermore, on PND1, BPA increased and modified hepatic triglyceride (TG) and free fatty acid (FFA) compositions in males only. In PND1 males, BPA increased hepatic expression of FFA uptake gene Fat/Cd36, and decreased the expression of TG synthesis- and β-oxidation-related genes (Dgat, Agpat6, Cebpα, Cebpβ, Pck1, Acox1, Cpt1a, Cybb). BPA altered DNA methylation and histone marks (H3Ac, H4Ac, H3Me2K4, H3Me3K36), and decreased the binding of several transcription factors (Pol II, C/EBPβ, SREBP1) within the male Cpt1a gene, the key β-oxidation enzyme. In PND1 females, BPA only increased the expression of genes involved in FFA uptake and TG synthesis (Lpl, Fasn, and Dgat). These data suggest that developmental BPA exposure alters and reprograms hepatic β-oxidation capacity in males, potentially through the epigenetic regulation of genes, and further alters the response to a HF diet. - Highlights: • Developmental BPA exposure exacerbates HF-diet induced steatosis in adult males. • Gestational BPA exposure increases hepatic lipid accumulation in neonatal males. • BPA decreases Cpt1a and other hepatic β-oxidation genes in neonatal males. • BPA alters neonatal male Cpt1a

  13. 18 CFR 401.33 - Administrative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the Compact § 401.33 Administrative agreements. The Executive Director is authorized and directed to enter into cooperative... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false...

  14. Local Administrators Planning Handbook. Final Report.

    ERIC Educational Resources Information Center

    Dyrenfurth, Michael J.; Dunlap, William S.

    As part of a project to develop a planning guide to assist local vocational education administrators in improving their planning efforts, a needs assessment questionnaire was developed to identify the degree of need for assistance in planning activities. Two hundred sixty-four Missouri local vocational administrators completed the pilot-tested…

  15. School Library Media Specialists: Essentially Administrators.

    ERIC Educational Resources Information Center

    Alewine, Martha

    2003-01-01

    Considers how school library media specialist administrative responsibilities can carry over to a job as state consultant for school library media services. Discusses characteristics of effective administrators; collaboration; the appreciative inquiry process for systemic change; and duties and projects of the state program that strengthen media…

  16. Yakima/Klickitat Fisheries Project - Klickitat Monitoring and Evaluation, 2007 Annual Report.

    SciTech Connect

    Zendt, Joe; Babcock, Mike

    2006-04-02

    This report describes the results of monitoring and evaluation (M&E) activities for salmonid fish populations and habitat in the Klickitat River subbasin in south-central Washington. The M&E activities described here were conducted as a part of the Bonneville Power Administration (BPA)-funded Yakima/Klickitat Fisheries Project (YKFP) and were designed by consensus of the scientists with the Yakama Nation (YN) Fisheries Program. YKFP is a joint project between YN and Washington Department of Fish and Wildlife (WDFW). Overall YKFP goals are to increase natural production of and opportunity to harvest salmon and steelhead in the Yakima and Klickitat subbasins using hatchery supplementation, harvest augmentation and habitat improvements. Klickitat subbasin M&E activities have been subjected to scientific and technical review by members of the YKFP Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP biologists have transformed the conceptual design into the tasks described. YKFP biologists have also been involved with the Collaborative Systemwide Monitoring and Evaluation Project (CSMEP - a project aimed at improving the quality, consistency, and focus of fish population and habitat data to answer key M&E questions relevant to major decisions in the Columbia Basin) and are working towards keeping Klickitat M&E activities consistent with CSMEP recommendations. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - to gather baseline information in order to characterize habitat and salmonid populations pre- and post-habitat restoration and pre-supplementation. (2) Ecological Interactions - to determine presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information. (3) Genetics - to develop YKFP supplementation broodstock collection

  17. 78 FR 66695 - Loveland Area Projects, Colorado River Storage Project, Pacific Northwest-Pacific Southwest...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... Area Power Administration Loveland Area Projects, Colorado River Storage Project, Pacific Northwest-Pacific Southwest Intertie Project, Central Arizona Project, and Parker-Davis Project--Rate Order No. WAPA... Western Area Power Administration (Western) Transmission Projects to Enter into WestConnect's...

  18. Sharp-tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project. Final Environmental Assessment

    SciTech Connect

    Not Available

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation.

  19. Sharp-Tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    Untied States. Bonneville Power Adminsitration.

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation.

  20. Positron emission tomography and [18F]BPA: a perspective application to assess tumour extraction of boron in BNCT.

    PubMed

    Menichetti, L; Cionini, L; Sauerwein, W A; Altieri, S; Solin, O; Minn, H; Salvadori, P A

    2009-07-01

    Positron emission tomography (PET) has become a key imaging tool in clinical practice and biomedical research to quantify and study biochemical processes in vivo. Physiologically active compounds are tagged with positron emitters (e.g. (18)F, (11)C, (124)I) while maintaining their biological properties, and are administered intravenously in tracer amounts (10(-9)-10(-12)M quantities). The recent physical integration of PET and computed tomography (CT) in hybrid PET/CT scanners allows a combined anatomical and functional imaging: nowadays PET molecular imaging is emerging as powerful pharmacological tool in oncology, neurology and for treatment planning as guidance for radiation therapy. The in vivo pharmacokinetics of boron carrier for BNCT and the quantification of (10)B in living tissue were performed by PET in the late nineties using compartmental models based on PET data. Nowadays PET and PET/CT have been used to address the issue of pharmacokinetic, metabolism and accumulation of BPA in target tissue. The added value of the use of L-[(18)F]FBPA and PET/CT in BNCT is to provide key data on the tumour extraction of (10)B-BPA versus normal tissue and to predict the efficacy of the treatment based on a single-study patient analysis. Due to the complexity of a binary treatment like BNCT, the role of PET/CT is currently to design new criteria for patient enrolment in treatment protocols: the L-[(18)F]BPA/PET methodology could be considered as an important tool in newly designed clinical trials to better estimate the concentration ratio of BPA in the tumour as compared to neighbouring normal tissues. Based on these values for individual patients the decision could be made whether BNCT treatment could be advantageous due to a selective accumulation of BPA in an individual tumour. This approach, applicable in different tumour entities like melanoma, glioblastoma and head and neck malignancies, make this methodology as reliable prognostic and therapeutic indicator for

  1. Bisphenol A (BPA) Exposure In Utero Leads to Immunoregulatory Cytokine Dysregulation in the Mouse Mammary Gland: A Potential Mechanism Programming Breast Cancer Risk.

    PubMed

    Fischer, Catha; Mamillapalli, Ramanaiah; Goetz, Laura G; Jorgenson, Elisa; Ilagan, Ysabel; Taylor, Hugh S

    2016-08-01

    Bisphenol-A (BPA) is a ubiquitous estrogen-like endocrine disrupting compound (EDC). BPA exposure in utero has been linked to breast cancer and abnormal mammary gland development in mice. The recent rise in incidence of human breast cancer and decreased age of first detection suggests a possible environmental etiology. We hypothesized that developmental programming of carcinogenesis may involve an aberrant immune response. Both innate and adaptive immunity play a role in tumor suppression through cytolytic CD8, NK, and Th1 T-cells. We hypothesized that BPA exposure in utero would lead to dysregulation of both innate and adaptive immunity in the mammary gland. CD1 mice were exposed to BPA in utero during gestation (days 9-21) via osmotic minipump. At 6 weeks, the female offspring were ovariectomized and estradiol was given at 8 weeks. RNA and protein were extracted from the posterior mammary glands, and the mRNA and protein levels were measured by PCR array, qRT-PCR, and western blot. In mouse mammary tissue, BPA exposure in utero significantly decreased the expression of members of the chemokine CXC family (Cxcl2, Cxcl4, Cxcl14, and Ccl20), interleukin 1 (Il1) gene family (Il1β and Il1rn), interleukin 2 gene family (Il7 receptor), and interferon gene family (interferon regulatory factor 9 (Irf9), as well as immune response gene 1 (Irg1). Additionally, BPA exposure in utero decreased Esr1 receptor gene expression and increased Esr2 receptor gene expression. In utero exposure of BPA resulted in significant changes to inflammatory modulators within mammary tissue. We suggest that dysregulation of inflammatory cytokines, both pro-inflammatory and anti-inflammatory, leads to a microenvironment that may promote disordered cell growth through inhibition of the immune response that targets cancer cells. PMID:26911702

  2. Long-term effects of a binary mixture of perfluorooctane sulfonate (PFOS) and bisphenol A (BPA) in zebrafish (Danio rerio).

    PubMed

    Keiter, Su; Baumann, L; Färber, H; Holbech, H; Skutlarek, D; Engwall, M; Braunbeck, T

    2012-08-15

    Previous in vitro studies have reported the potential of perfluorooctane sulfonate (PFOS) to increase the toxicity of other compounds. Given the complex nature of mixtures of environmental pollutants in aquatic systems together with the persistent and bioaccumulative properties of PFOS, this study aimed at evaluating the long-term effects and toxicity-increasing behavior of PFOS in vivo using the zebrafish (Danio rerio). Fish were maintained in flow-through conditions and exposed to single and binary mixtures of PFOS and the endocrine disruptor bisphenol A (BPA) at nominal concentrations of 0.6, 100 and 300 μg/L and 10, 200 and 400 μg/L, respectively. F1 and F2 generations were evaluated from 0 to 180 days post-fertilization (dpf) and F3 generation was evaluated from 0 to 14 dpf. Survival was documented in all generations, whereas growth, fecundity, fertilization rate, histological alterations (in liver, thyroid and gonads) and vitellogenin (Vtg) induction in males were evaluated for F1 and F2 generations. Data for growth were collected at 30, 90 and 180 dpf and data for histological evaluations and Vtg induction were analyzed at 90 and 180 dpf. No significant effects on survival were seen in the F1 generation in any treatment following 180 d exposure; however, in the F2 generation, 300 μg/L PFOS both alone and in combination with BPA (10, 200 and 400 μg/L) induced 100% mortality within 14 dpf. PFOS (0.6 and 300 μg/L) did not increase the Vtg-inducing potential of BPA (10, 200 and 400 μg/L) in a binary mixture. In contrast, binary mixtures with 300 μg/L PFOS suppressed the Vtg levels in F1 males at 90 dpf when compared to single BPA exposures. Whereas the lowest tested PFOS concentration (0.6 μg/L) showed an estrogenic potential in terms of significant Vtg induction, Vtg levels were generally found to decrease with increasing PFOS-exposure in both F1 and F2 generations. In F1 generation, BPA-exposure was found to increase Vtg levels in a concentration

  3. Organization/Administration.

    ERIC Educational Resources Information Center

    Chaffee, Ellen Earle

    Patterns that emerged from reviewing 26 syllabi for courses on organization and administration in higher education are discussed, and six sample syllabi are presented. The syllabi focused more on organization than administration. Of the 26 syllabi, 19 dealt with organization and administration generally; 5 with administration in a specific…

  4. Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2005-2006 Annual Report.

    SciTech Connect

    Schille, Patrick C.

    2006-05-01

    The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.

  5. Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2003-2004 Annual Report.

    SciTech Connect

    Schille, Patrick C.

    2004-04-01

    The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.

  6. South Fork Snake River/Palisades Wildlife Mitigation Project: Environmental assessment

    SciTech Connect

    1995-09-01

    BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. The Idaho Department of Fish and Game drafted the plan, which was completed in May 1993. This plan recommends land and conservation easement acquisition and wildlife habitat enhancement measures. These measures would be implemented on selected lands along the South Fork of the Snake River between Palisades Dam and the confluence with the Henry`s Fork, and on portions of the Henry`s Fork located in Bonneville, Madison, and Jefferson Counties, Idaho. BPA has prepared an Environmental Assessment evaluating the proposed project. The EA also incorporates by reference the analyses in the South Fork Snake River Activity/Operations Plan and EA prepared jointly in 1991 by the Bureau of Land Management and the Forest Service. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  7. Disposition of bisphenol AF, a bisphenol A analogue, in hepatocytes in vitro and in male and female Harlan Sprague-Dawley rats and B6C3F1/N mice following oral and intravenous administration.

    PubMed

    Waidyanatha, Suramya; Mathews, James M; Patel, Purvi R; Black, Sherry R; Snyder, Rodney W; Fennell, Timothy R

    2015-01-01

    1. Bisphenol AF (BPAF) is used as a crosslinking agent for polymers and is being considered as a replacement for bisphenol A (BPA). 2. In this study, comparative clearance and metabolism of BPAF and BPA in hepatocytes and the disposition and metabolism of BPAF in rodents following oral administration of 3.4, 34 or 340 mg/kg [(14)C]BPAF were investigated. 3. BPAF was cleared more slowly than BPA in hepatocytes with the rate: rat > mouse > human. 4. [(14)C]BPAF was excreted primarily in feces by 72 h after oral administration to rats (65-80%) and mice (63-72%). Females excreted more in urine (rat, 15%; mouse, 24%) than males (rat, 1-4%; mouse, 10%). Residual tissue radioactivity was <2% of the dose at 72 h. Similar results were observed following intravenous administration. 5. In male rats, 52% of a 340 mg/kg oral dose was excreted in 24 h bile and was mostly comprised of BPAF glucuronide. However, >94% of fecal radioactivity was present as BPAF, suggesting extensive deconjugation in the intestine. 6. Metabolites identified in bile were BPAF-glucuronide, -diglucuronide, -glucuronide sulfate and -sulfate. 7. In conclusion, BPAF was well absorbed following gavage administration and highly metabolized and excreted mostly in the feces as BPAF. PMID:25923777

  8. Expression of stress response HSP70 gene in Asian paddle crabs, Charybdis japonica, exposure to endocrine disrupting chemicals, bisphenol A (BPA) and 4-nonylphenol (NP)

    NASA Astrophysics Data System (ADS)

    Park, Kiyun; Kwak, Ihn-Sil

    2013-06-01

    The Asian paddle crab, Charybdis japonica, is a potential bio-indicator reflecting marine sediment toxicity as well as a commercially important species living along coastal areas in Korea. This study investigated its stress response by looking at the heat shock protein (HSP70) gene of C. japonica when the organism is exposed to bisphenol A (BPA) and 4-nonylphenol (NP). We characterized partial sequence of HSP70 as the stressresponse gene of C. japonica. The nucleotide sequence of C. japonica HSP70 is over 90% homologous with the corresponding gene of other crabs. Phylogenetic tree analysis revealed a close relationship between C. japonica HSP70 and HSP70 in other species of lobster and shrimps. HSP70 mRNA transcripts were detected in all the examined tissues of C. japonica, with the highest level in gills, the organ that most frequently came into contact with the external BPA or NP-laden water. As no reference data were available for C. japonica crab exposure, the BPA and NP 24-h LC50 values have not been previously determined. The expression of the C. japonica HSP70 gene to various BPA or NP concentrations during short and longer times was assessed. Gene expression was significantly induced in concentration- and time-dependent manners after BPA or NP exposures. These results support the postulation that crab C. japonica HSP70 could be a potential stress response molecular marker to monitor marine ecosystems.

  9. Ashland Area Support Substation Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power & Light Company`s (PP&L) 115-kilovolt (kV) transmission lines and through PP&L`s Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP&L to allow transfer of three megawatts (MW`s) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP&L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  10. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    SciTech Connect

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  11. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... Southwestern Power Administration Sam Rayburn Dam Project Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of proposed extension. SUMMARY: The current Sam Rayburn Dam Project rate was... cost recovery criteria. In accordance with Southwestern's isolated project rate adjustment...

  12. Environmental Assessment on BPA's Proposed Funding of Lower Umatilla River Anadromous Salmonid Passage Enhancement Projects, FY 1983.

    SciTech Connect

    United States. Bonneville Power Administration.

    1983-07-01

    The major factors presently restricting fall and spring chinook reintroduction are the lack of adequate streamflows during spawning migration and resulting passage difficulties in the lower River and at Three Mile Falls. Maxwell and Cold Springs Diversion dams are also potential passage barriers during low flow years. In order to get fish past diversion structures and over shallow river bars, biologists generally feel that a minimum streamflow of 250-300 ft/sup 3/s is needed in September, October, November, May and June from the mouth of McKay Creek downstream to provide adequate transportation and spawning flow for adult fall and spring chinook. Three Mile Falls Diversion Dam is the highest diversion facility on the Umatilla River and is a formidable obstacle to anadromous fish. The lip of the dam passes a uniform flow over the crest, and fish are not necessarily attracted to the fish ladder entrance. While attempting to jump over the dam, adult steelhead have become trapped in the dam's buttress bays. Modification of the dam's passage facilities and the immediate downstream area would provide additional capacity to pass fish migration flows when water is available, improved screens and fish ladder accessibility, and a better defined channel by which the migrants can reach the fish ladders. 24 figs.

  13. Fate of phthalates and BPA in agricultural and non-agricultural soils of the Paris area (France).

    PubMed

    Tran, Bich Chau; Teil, Marie-Jeanne; Blanchard, Martine; Alliot, Fabrice; Chevreuil, Marc

    2015-07-01

    This study (i) investigated the concentration levels of nine phthalates and bisphenol A (BPA) in sludge samples originating from a French wastewater treatment plant (WWTP), (ii) studied the distribution of target compounds according to soil depth and calculated their half-lives, and (iii) compared the contamination level of the agricultural soil with those of soils with other land uses. The sludge contamination levels varied from a few hundred nanograms per gram dry weight (dw) for diethyl phthalate (DEP), di-iso-butyl phthalate (DiBP), di-n-butyl phthalate (DnBP), and butyl-benzyl phthalate (BBP) to a few micrograms per gram dw for diethylhexyl phthalate (DEHP), di-iso-nonyl phthalate (DiNP), and di-iso-decyl phthalate (DiDP). After sludge application, an 8-fold increase for DEHP level and a 3-fold increase for BPA level occurred in the surface horizon of the soil. The mean distribution of phthalates according to the depth showed a positive gradient for the low molecular weight compounds and inversely, a negative gradient for the highest ones. The half-lives in the 0-20-cm soil horizon were 64 days for DEHP and 36 days for BPA. A predictive environmental concentration (PEC) of 0.3 μg g(-1) dw was estimated for DEHP, while the experimental value was 0.16 μg g(-1) dw, suggesting degradation processes in soil and/or formation of non-extractable residues. Comparisons of contamination levels for soils from different origins (urban, rural, agricultural, and forest) showed that the urban soil remained the most contaminated one, prior to the agricultural soil after treatment. PMID:25794574

  14. Administration for Community Living

    MedlinePlus

    ... by Acting Assistant Secretary for Aging and ACL Administrator Edwin Walker at the HCBS Conference (08/29/ ... Remarks by Assistant Secretary on Aging and ACL Administrator Kathy Greenlee at the n4a Answers on Aging ...

  15. The New Administrative Computing.

    ERIC Educational Resources Information Center

    Green, Kenneth C.

    1988-01-01

    The past decade has seen dramatic changes in administrative computing, including more systems, more applications, a new group of computer users, and new opportunities for computer use in campus administration. (Author/MSE)

  16. Transportation Security Administration

    MedlinePlus

    ... content Official website of the Department of Homeland Security Transportation Security Administration When I fly can I bring my... ... to know if you could bring through the security checkpoint. Main menu Administrator Travel Security Screening Special ...

  17. NASA, NOAA administrators nominated

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    President Ronald Reagan recently said he intended to nominate James Montgomery Beggs as NASA Administrator and John V. Byrne as NOAA Administrator. These two positions are key scientific posts that have been vacant since the start of the Reagan administration on January 20. The President also said he intends to nominate Hans Mark as NASA Deputy Administrator. At press time, Reagan had not designated his nominee for the director of the Office of Science and Technology Policy.

  18. A Philosophy of Administration.

    ERIC Educational Resources Information Center

    Bruening, William H.

    Justification is given for paying relatively large salaries to college administrators, specifically the president or chancellor and the chief academic officer. Three administrative task areas are discussed as criteria: management, administration per se, and leadership. It is contended that only leadership can be used as a criterion for…

  19. School Business Administration.

    ERIC Educational Resources Information Center

    Jordan, K. Forbis; And Others

    This textbook reviews the principal concerns within each of 13 major responsibility areas in school business administration. The first chapter assesses the political, social, and economic context in which schools function and school administrators work. The role and function of the school business administrator within this context is addressed in…

  20. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  1. Design, synthesis and evaluation of mutual prodrug of 4-biphenylacetic acid and quercetin tetramethyl ether (BPA-QTME) as gastrosparing NSAID.

    PubMed

    Madhukar, Mamta; Sawraj, Shruti; Sharma, Pritam Dev

    2010-06-01

    A novel mutual prodrug consisting of 4-biphenylacetic acid (BPA) and quercetin tetramethyl ether (QTME) has been synthesized as a gastrosparing NSAID, devoid of ulcerogenic side effects. The physicochemical properties, including aqueous solubility, partition coefficient, chemical stability and enzymatic hydrolysis of synthesized derivative have been studied to assess its prodrug potential. Its antiinflammatory, antiulcer and analgesic activities were also evaluated. The results indicated that BPA-QTME derivative is chemically stable, biolabile and possesses optimum lipophilicity. The synthesized compound also exhibited retention of antiinflammatory activity with reduced ulcerogenicity. Based on these observations, the therapeutic potential of this mutual prodrug is discussed. PMID:20227799

  2. Stress and the Administrator of Rural Schools Being Rebuilt

    ERIC Educational Resources Information Center

    Wright, Robert J.; Lesisko, Lee J.

    2010-01-01

    School construction or renovation projects can have a profound affect on students, faculty and administration. The negative impact on the ongoing educational programs is a stressor for many administrators. The possibility that rural school administrators would experience more stress producing problems than would suburban and urban school leaders…

  3. Administrative Rules of the Illinois Community College Board.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    This document is a collection of administrative rules of the Illinois Community College Board (ICCB). It is divided into seven subparts: Illinois Community College Board Administration; Local District Administration; Programs; Students; Finance; Capital Projects; and Personnel. Highlights are as follows: Independent organizations may be considered…

  4. Surface aspects of discolouration in Bisphenol A Polycarbonate (BPA-PC), used as lens in LED-based products

    NASA Astrophysics Data System (ADS)

    Yazdan Mehr, M.; van Driel, W. D.; Udono, H.; Zhang, G. Q.

    2014-11-01

    The surface-related reactions during discolouration of Bisphenol A Polycarbonate (BPA-PC), used as LED lens plates, under thermal stress are studied. X-ray photoelectron spectroscopy (XPS) has been used to monitor the changes in the surface chemistry of BPA-PC plates over a temperature range of 100-140 °C for a period up to 3000 h. Increasing time under thermal stress is associated with the discolouration, and increase in the yellowing index (YI) of PC plastic lens. The XPS results show that discolouration is associated with oxidation at the surface, finding a significant increase in the signal ratio O1s/C1s in the XPS spectra of degraded specimens. During thermal ageing, the Csbnd H concentration decreases and new oxide features Cdbnd O and Osbnd Cdbnd O form, with the latter being a support for oxidation at the surface being a major reaction during discolouration. Results also show that irradiation with blue light during thermal ageing accelerates the kinetics of discolouration and the increased O1s/C1s ratio in XPS spectra.

  5. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities... Federal-aid system projects which facilitate the use of high occupancy vehicles and public...

  6. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities... Federal-aid system projects which facilitate the use of high occupancy vehicles and public...

  7. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities... Federal-aid system projects which facilitate the use of high occupancy vehicles and public...

  8. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities... Federal-aid system projects which facilitate the use of high occupancy vehicles and public...

  9. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2003 Annual Report.

    SciTech Connect

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2004-02-27

    twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

  10. Habitat Evaluation Procedure (HEP) Report for the Pend Oreille Wetlands Wildlife II Project, Technical Report 2002.

    SciTech Connect

    Holmes, Darren

    2003-06-01

    Bonneville Power Administration (BPA) for protection of habitats within the project area. The HSI models used were identical to those modified for use in 1991 (Appendix 2). The objective of using HEP as an assessment tool is two-fold. First, it provides an unbiased and measured assessment of wildlife habitats within the mitigation parcel. This data is used to offset the Albeni Falls Dam HU loss ledger. That ledger accounts for the loss of wildlife habitat that resulted from the construction and inundation of Albeni Falls hydroelectric project and the extent to which those losses have been mitigated. Additionally, the baseline HEP evaluation describes existing habitat conditions on the property and will be used, along with other tools, to determine initial management, restoration, and enhancement activities. HEP analyses will be completed every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional HU crediting to BPA for enhanced habitat values.

  11. Habitat Evaluation Procedure (HEP) Report for the Pend Oreille Wetlands Wildlife Project, Technical Report 2002.

    SciTech Connect

    Holmes, Darren

    2003-05-01

    Bonneville Power Administration (BPA) for protection of habitats within the project area. The HSI models used were identical to those modified for use in 1991 (Attachment A). The objective of using HEP as an assessment tool is two-fold. First, it provides an unbiased and measured assessment of wildlife habitats within the mitigation parcel. This data is used to offset the Albeni Falls Dam HU loss ledger. That ledger accounts for the loss of wildlife habitat that resulted from the construction and inundation of Albeni Falls hydroelectric project and the extent to which those losses have been mitigated. Additionally, the baseline HEP evaluation describes existing habitat conditions on the property and will be used, along with other tools, to determine initial management, restoration, and enhancement activities. HEP analyses will be completed every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional HU crediting to BPA for enhanced habitat values.

  12. Veterans Administration Databases

    Cancer.gov

    The Veterans Administration Information Resource Center provides database and informatics experts, customer service, expert advice, information products, and web technology to VA researchers and others.

  13. Building Public Confidence in Urban Schools: It Begins inside the District. A Guide for Administrators and Board Members. A Public Relations Executives Network Project of the Council of the Great City Schools, 2009-2010

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2010

    2010-01-01

    Effective organizational communication begins with employees, who should be communications ambassadors for a district. From administrators to teachers to school bus drivers to custodians, employees set the tone for a district. The informal conversations they have at church, the bowling alley, the barbershop and other venues can make or break the…

  14. Precise time dissemination and applications development on the Bonneville Power Administration system

    NASA Technical Reports Server (NTRS)

    Martin, Ken E.; Esztergalyos, J.

    1992-01-01

    The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

  15. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  16. Effect of heat processing and storage time on migration of bisphenol A (BPA) and bisphenol A-diglycidyl ether (BADGE) to aqueous food simulant from Mexican can coatings.

    PubMed

    Munguia-Lopez, E M; Soto-Valdez, H

    2001-08-01

    Effects of heat processing and storage time (up to 70 days) on migration of bisphenol A (BPA) and bisphenol A-diglycidyl ether (BADGE) from can coatings into an aqueous food simulant were determined. Distilled water was canned in two types of Mexican cans: for tuna and for jalapeño peppers. Results showed that there is an effect of heat treatment on migration of both compounds. Storage time did not show any effect in BPA migration from tuna cans. There was an effect of storage time on BPA migration from jalapeño pepper cans. Results for BADGE migration were affected by its susceptibility to hydrolyze in aqueous simulants. BADGE concentration decreased, or was not detected, during storage in both types of cans. Migration levels for BPA and BADGE were within 0.6-83.4 and <0.25-4.3 microg/kg, respectively. Both were below European and Mercosur legislation limits. Other migrating compounds were detected, although no identification was performed. PMID:11513645

  17. Reliability and Factor Structure of the Autism Spectrum Disorders-Behavior Problems for Adults (ASD-BPA) with Intellectual Disabilities and Autism

    ERIC Educational Resources Information Center

    Matson, Johnny L.; Rivet, Tessa T.

    2008-01-01

    This study was designed to establish the initial psychometric properties of the first scale specifically developed for behavior problems of adults with Autism Spectrum Disorders (ASD) and intellectual disability (ID). The Autism Spectrum Disorders-Behavior Problems for Adults (ASD-BPA) consists of 20 items in which raters indicate if each item is…

  18. Life Skills Project

    ERIC Educational Resources Information Center

    Jalazo, Michael D.

    2005-01-01

    In this article, the author, Program Administrator of the Pinellas County Sheriff's Office (PCSO) Project New Attitudes in Clearwater, Florida, describes the project. The PCSO is the country's largest law enforcement agency, providing law enforcement services to over 400,000 of its residents who reside in the unincorporated areas of the county and…

  19. The Billboard Project

    ERIC Educational Resources Information Center

    Weaver, Victoria

    2005-01-01

    Since 1997, the author coordinated a large-scale billboard project. Coordinated to coincide with the National Art Education Association's celebration of Youth Art Month, strong commitments from faculty, students, administrators, public-relations liaisons, local press, radio, TV, and community businesses have made this project a success. The first…

  20. Enrollment Projection Model.

    ERIC Educational Resources Information Center

    Gustafson, B. Kerry; Hample, Stephen R.

    General documentation for the Enrollment Projection Model used by the Maryland Council for Higher Education (MCHE) is provided. The manual is directed toward both the potential users of the model as well as others interested in enrollment projections. The first four chapters offer administrators or planners insight into the derivation of the…

  1. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2000.

    SciTech Connect

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2001-03-01

    basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.

  2. CDS - Database Administrator's Guide

    NASA Astrophysics Data System (ADS)

    Day, J. P.

    This guide aims to instruct the CDS database administrator in: o The CDS file system. o The CDS index files. o The procedure for assimilating a new CDS tape into the database. It is assumed that the administrator has read SUN/79.

  3. Vocational Education Administration Handbook.

    ERIC Educational Resources Information Center

    Ryals, Karen, Ed.; Doherty, Susan Sloan, Ed.

    This handbook for vocational administrators presents an overview of vocational education programs, services, and administrative structures in Alaska. The manual contains three parts. The first, brief section introduces secondary vocational education and lists its enabling legislation. The second part presents a detailed overview of vocational…

  4. Reframing Research Administration

    ERIC Educational Resources Information Center

    Cole, Sharon Stewart

    2010-01-01

    The purpose of this paper is to inform administrators and organizational leaders that a change in the support offered to faculty and the environment of research administration is desirable. This recommendation is supported by the results of a Delphi study that was undertaken to gather expert opinions and recommendations from research faculty…

  5. Justifying Educational Administration.

    ERIC Educational Resources Information Center

    Evers, Colin; Lakomski, Gabriele

    1993-01-01

    The traditional conceptions of science dominating educational administration are mistaken. Unacceptable epistemologies, like those implicit in logical positivism, justify knowledge solely in terms of empirical adequacy. An improved science of educational administration embraces a coherent global theory accounting for all the phenomena of human…

  6. DIMENSIONS OF ADMINISTRATIVE PERFORMANCE.

    ERIC Educational Resources Information Center

    HEMPHILL, JOHN; AND OTHERS

    THE MAJOR OBJECTIVES WERE TO DEVELOP CRITERIA FOR THE EVALUATION OF SCHOOL ADMINISTRATION, TO DEFINE THE NATURE OF THE JOB, AND TO DEVELOP AN INSTRUMENT FOR THE SELECTION OF ADMINISTRATORS. THE ELEMENTARY SCHOOL PRINCIPAL WAS CHOSEN FOR THE STUDY BECAUSE OF THE HOST OF PROBLEMS RELATED TO THE CONDUCT OF AN EDUCATIONAL PROGRAM, INCLUDING THE…

  7. Test Administration Models

    ERIC Educational Resources Information Center

    Becker, Kirk A.; Bergstrom, Betty A.

    2013-01-01

    The need for increased exam security, improved test formats, more flexible scheduling, better measurement, and more efficient administrative processes has caused testing agencies to consider converting the administration of their exams from paper-and-pencil to computer-based testing (CBT). Many decisions must be made in order to provide an optimal…

  8. Networked Administration Streamlines Operations.

    ERIC Educational Resources Information Center

    School Planning and Management, 1996

    1996-01-01

    An Iowa school district has retooled its computer systems for more standardized administration. In addition to administration, the district is doing inhouse databasing of financial accounting, and doing inhouse scheduling and grade reporting. A partnership with the Chamber of Commerce contributed $500,000 for the network system. (MLF)

  9. The Administrative Power Grab

    ERIC Educational Resources Information Center

    Sorenson, Richard D.

    2007-01-01

    Administrative power for some school teachers can be an aphrodisiac that can be applied negatively, especially when a leader has devastating instinct for the weaknesses of others. A leader's intellect and heart closes shop and ceases to function when drunk on power. In this article, the author describes how the use of administrative power can be…

  10. Champions of Children. Administrators . . .

    ERIC Educational Resources Information Center

    Chaffee, John; Olds, H. Robert

    Today, in an era of taxpayer revolts, lack of clarity in values, and changing family structure, children need advocates in the political arena as well as in the schools. This pamphlet suggests that administrators are in an excellent position to defend the rights of children on all fronts. It focuses on what administrators have done and specific…

  11. Administration for Student Development.

    ERIC Educational Resources Information Center

    Bergen, J. J., Ed.

    This collection of papers focuses on school administration and its relation to students. It is contended that toay's student matures earlier; has higher expectations; is more affluent; is more isolated from adults; is more critical and outspoken; and, therefore, must be heard by teachers and administrators. A related document is EA 001578.…

  12. Administration of Computer Resources.

    ERIC Educational Resources Information Center

    Franklin, Gene F.

    Computing at Stanford University has, until recently, been performed at one of five facilities. The Stanford hospital operates an IBM 370/135 mainly for administrative use. The university business office has an IBM 370/145 for its administrative needs and support of the medical clinic. Under the supervision of the Stanford Computation Center are…

  13. Rural Administrative Leadership Handbook.

    ERIC Educational Resources Information Center

    Tift, Carolyn

    This resource book on rural administrative leadership is the result of 1988 interviews with school administrators involved in successful rural educational programs. The material is divided into eight chapters, each self-contained for separate use. Chapter 1, "Getting to Know the Community," addresses qualities of living and working in rural…

  14. School Business Administration.

    ERIC Educational Resources Information Center

    Jordan, K. Forbis; Webb, L. Dean

    1986-01-01

    Reviews the societal and organizational changes affecting school business administration, describes major activities encompassed in the practice of school business administration, and reviews current literature specifically related to such activities as electronic data processing, fiscal planning and budgeting, purchasing and property management,…

  15. The Administrative Team.

    ERIC Educational Resources Information Center

    Ohio Association of Elementary School Principals, Westerville.

    Although needs of school districts vary with size, degree of teacher negotiation procedures, and type of community involvement, the administrative team model is presented as an effective, appropriate administrative organization. Based on an assumption that each level of authority in a school district possesses and exercises expertise and unique…

  16. Handbook for Alumni Administration.

    ERIC Educational Resources Information Center

    Webb, Charles H., Ed.

    A definitive look at the field of alumni administration is presented, noting that the subject has until now received little attention. The 34 chapters are divided into nine sections: an overview of alumni administration; alumni as an essential resource; people management; budget and records; programming; communications; alumni education programs…

  17. Investigation of the Effects of Subchronic Low Dose Oral Exposure to Bisphenol A (BPA) and Ethinyl Estradiol (EE) on Estrogen Receptor Expression in the Juvenile and Adult Female Rat Hypothalamus

    PubMed Central

    Rebuli, Meghan E.; Cao, Jinyan; Sluzas, Emily; Delclos, K. Barry; Camacho, Luísa; Lewis, Sherry M.; Vanlandingham, Michelle M.; Patisaul, Heather B.

    2014-01-01

    Concerns have been raised regarding the long-term impacts of early life exposure to the ubiquitous environmental contaminant bisphenol A (BPA) on brain organization. Because BPA has been reported to affect estrogen signaling, and steroid hormones play a critical role in brain sexual differentiation, there is also concern that BPA exposure could alter neural sex differences. Here, we examine the impact of subchronic exposure from gestation to adulthood to oral doses of BPA below the current no-observed-adverse-effect level (NOAEL) of 5 mg/kg body weight (bw)/day on estrogen receptor (ESR) expression in sexually dimorphic brain regions of prepubertal and adult female rats. The dams were gavaged daily with vehicle (0.3% carboxymethylcellulose), 2.5, 25, 260, or 2700 μg BPA/kg bw/day, or 0.5 or 5.0 μg ethinyl estradiol (EE)/kg bw/day from gestational day 6 until labor began. Offspring were then gavaged directly from the day after birth until the day before scheduled sacrifice on postnatal days 21 or 90. Using in situ hybridization, one or more BPA doses produced significant decreases in Esr1 expression in the juvenile female rat anteroventral periventricular nucleus (AVPV) of the hypothalamus and significant decreases in Esr2 expression in the adult female rat AVPV and medial preoptic area (MPOA), relative to vehicle controls. BPA did not simply reproduce EE effects, indicating that BPA is not acting solely as an estrogen mimic. The possible consequences of long-term changes in hypothalamic ESR expression resulting from subchronic low dose BPA exposure on neuroendocrine effects are discussed and being addressed in ongoing, related work. PMID:24752507

  18. 47 CFR 54.715 - Administrative expenses of the Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Administrative expenses of the Administrator. 54.715 Section 54.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Administration § 54.715 Administrative expenses of the Administrator. (a) The annual administrative expenses...

  19. 47 CFR 54.715 - Administrative expenses of the Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Administrative expenses of the Administrator. 54.715 Section 54.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Administration § 54.715 Administrative expenses of the Administrator. (a) The annual administrative expenses...

  20. Head of Administration

    NASA Astrophysics Data System (ADS)

    2005-03-01

    Purpose and scope of the position: The main task is to provide efficient administrative services and advice to the Director General, Division Leaders and to staff members in the scientific and technical areas in the fields of financial planning and accounting, personnel management, purchasing, legal and contractual matters, information systems and building and site maintenance. As a member of the ESO Management the Head of Administration contributes essentially to the development of the overall policy, strategic planning, relations to the members of the personnel and maintains professional contacts at highest level outside the Organisation. ESO employs in total approximately 650 staff members and the Administration Division comprises the Administration at the Headquarters in Garching near Munich and the Administration in Santiago (Chile). The successful candidate will be supported by some 50 qualified staff members.

  1. Operations Research and Higher Education Administration.

    ERIC Educational Resources Information Center

    Cheng, T. C . E.

    1993-01-01

    Illustrates the uses of operations research (OR) in higher education administration by reviewing the higher education system's most significant operational problems: resource allocation, financial planning, budgeting, formation of student project groups, scheduling and classroom allocation, student registration, tuition and fee structure…

  2. Strengthening State Library Administrative Agency (Territorial Library).

    ERIC Educational Resources Information Center

    Nieves M. Flores Memorial Library, Agana, Guam.

    This document describes the Basic State Plan Amendments for the Library Services and Construction Act in Guam and the regulations promulgated thereunder. The major projects described under the plan are: Strengthening State Library Administrative Agency; Staff Development; Library Collections, Extention Services, Institutional Libraries; and…

  3. Wasco Riparian Buffer Project, Annual Report 2003-2004.

    SciTech Connect

    Graves, Ron

    2003-07-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Deschutes River Sub-basin Summary, March 2, 2001. This project is providing the technical planning support needed to implement at least 20 riparian buffer system contracts on approximately 800 acres covering an estimated 36 miles of anadromous fish streams. During this second year of implementation, 17 buffer contracts were established on 173,462 ft. of stream (25.9 miles). Acreage included in the buffers totaled 891.6 acres. Average buffer width was 112 ft. on each side of the stream. Cumulative totals through the first two project years are 26 buffers on 36.6 stream miles covering 1,283.6 acres. Actual implementation costs, lease payments, and maintenance costs will be borne by existing USDA programs: Conservation Reserve (CRP) and Conservation Reserve Enhancement Programs (CREP). The lease period of each contract may vary from 10 to 15 years. During this year, the average lease period was 14.9 years. The total value of contracts established this year is $1,421,268 compared with $55,504 in BPA contract costs to provide the technical support needed to get the contracts implemented. Cumulative contract value for the first two years is $1,919,451 compared to $103,329 cost to BPA. This project provides technical staffing to conduct assessments and develop conservation plans required for riparian buffer systems to help keep pace with a growing backlog of potential buffer projects. This project meets a critical need in the lower Deschutes and lower John Day River basins and complements the Riparian Buffer project approved for Fifteenmile watershed, Project No. 2001-021-00 begun in fiscal year 2001. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion and benefits the mid-Columbia ESU of steelhead.

  4. Removal of BPA model compounds and related substances by means of column chromatography using Octolig®.

    PubMed

    Alessio, Rachael J; Li, Xiao; Martin, Dean F

    2012-01-01

    Octolig®, a polyethylenediimine ligand covalently attached to high-surface area silica gel, was used to study the removal of phenolic compounds from aqueous samples by column chromatography. Model phenolic compounds of Bisphenol A (BPA), 4-isopropylphenol and 4-(t-butyl) phenol, were selected for this study due to their similarities in pKa and log P values. The percent removal of these compounds by Octolig® was 26 ± 2 and 22 ± 2, respectively. Furthermore, the three isomers of nitrophenol were investigated as well as additional phenolic compounds, such as amoxicillin and five phenolic dyes. These compounds have a pKa range of 2-10.2. The compounds that have pKa values less than 8.3 were able to be completely removed by Octolig®, yet compounds with pKa values of 8.3 and higher resulted in approximately 20-26% removal. PMID:22934990

  5. Plastics Derived Endocrine Disruptors (BPA, DEHP and DBP) Induce Epigenetic Transgenerational Inheritance of Obesity, Reproductive Disease and Sperm Epimutations

    PubMed Central

    Manikkam, Mohan; Tracey, Rebecca; Guerrero-Bosagna, Carlos; Skinner, Michael K.

    2013-01-01

    Environmental compounds are known to promote epigenetic transgenerational inheritance of adult onset disease in subsequent generations (F1–F3) following ancestral exposure during fetal gonadal sex determination. The current study was designed to determine if a mixture of plastic derived endocrine disruptor compounds bisphenol-A (BPA), bis(2-ethylhexyl)phthalate (DEHP) and dibutyl phthalate (DBP) at two different doses promoted epigenetic transgenerational inheritance of adult onset disease and associated DNA methylation epimutations in sperm. Gestating F0 generation females were exposed to either the “plastics” or “lower dose plastics” mixture during embryonic days 8 to 14 of gonadal sex determination and the incidence of adult onset disease was evaluated in F1 and F3 generation rats. There were significant increases in the incidence of total disease/abnormalities in F1 and F3 generation male and female animals from plastics lineages. Pubertal abnormalities, testis disease, obesity, and ovarian disease (primary ovarian insufficiency and polycystic ovaries) were increased in the F3 generation animals. Kidney and prostate disease were only observed in the direct fetally exposed F1 generation plastic lineage animals. Analysis of the plastics lineage F3 generation sperm epigenome previously identified 197 differential DNA methylation regions (DMR) in gene promoters, termed epimutations. A number of these transgenerational DMR form a unique direct connection gene network and have previously been shown to correlate with the pathologies identified. Observations demonstrate that a mixture of plastic derived compounds, BPA and phthalates, can promote epigenetic transgenerational inheritance of adult onset disease. The sperm DMR provide potential epigenetic biomarkers for transgenerational disease and/or ancestral environmental exposures. PMID:23359474

  6. Serving the Space Administration

    ERIC Educational Resources Information Center

    Campbell, Jack E.; Thompson, Arthur W.

    1974-01-01

    The purpose of the current program was to establish an upward mobility program that afforded employees an opportunity to improve their credibility in job opportunity selection under the directives of the National Aeronautics and Space Administration. (Author/RK)

  7. Copyright Implications for Administrators.

    ERIC Educational Resources Information Center

    Simpson, Carol Mann

    1994-01-01

    Discusses copyright compliance policies for school administrators and the librarian's role in policy implementation. Topics addressed include fines; court litigation; monitoring compliance; training sessions for teachers and staff; computer software audits; and sources for more information. (LRW)

  8. Goldstone (GDSCC) administrative computing

    NASA Technical Reports Server (NTRS)

    Martin, H.

    1981-01-01

    The GDSCC Data Processing Unit provides various administrative computing services for Goldstone. Those activities, including finance, manpower and station utilization, deep-space station scheduling and engineering change order (ECO) control are discussed.

  9. Confrontation and Administrative Response

    ERIC Educational Resources Information Center

    Auerbach, Arnold J.

    1969-01-01

    Describes some of the sociological and psychological effects of organizational conflict and offers 10 operational principles to guide public administrators of schools and social agencies in meeting the confrontation tactics of activist groups. (JH)

  10. One for the Administrators

    ERIC Educational Resources Information Center

    American School and University, 1978

    1978-01-01

    Earth berms, a heavily insulated roof, and a narrow band of thermal pane windows, save energy at the administrative headquarters of the Anoka Hennepin school district in Coon Rapids, a suburb of Minneapolis, Minnesota. (Author/MLF)

  11. The Purchasing Administrator.

    ERIC Educational Resources Information Center

    Ferguson, Joyce E.

    1985-01-01

    Discusses the professional purchasing administrator's most common areas of responsibility: (1) staffing the department, (2) maintaining professional objectivity in vendor relationships, (3) following bidding policies, (4) receiving user input and feedback, and (5) seeking local equipment service and maintenance. (MLF)

  12. Introducing Public Administration

    ERIC Educational Resources Information Center

    Stein, Jay W.

    1975-01-01

    The use of documents and the analysis of definitions are recommended as a means for adding zest to an introduction to public administration course to obtain student interest and motivation. (Author/ND)

  13. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2001.

    SciTech Connect

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2002-12-01

    between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.

  14. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    SciTech Connect

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2003-06-30

    landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, riparian fencing, juniper control, permanent diversions, pump stations, infiltration galleries and return-flow cooling systems. Project costs in 2002 totaled $423,198.00 with a total amount of $345,752.00 (81%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

  15. 7 CFR 3430.204 - Project types and priorities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ADMINISTRATIVE PROVISIONS Specialty Crop Research Initiative § 3430.204 Project types and priorities. For each... projects that are multistate, multi-institutional, and multidisciplinary; and include explicit...

  16. 7 CFR 3430.204 - Project types and priorities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ADMINISTRATIVE PROVISIONS Specialty Crop Research Initiative § 3430.204 Project types and priorities. For each... projects that are multistate, multi-institutional, and multidisciplinary; and include explicit...

  17. 7 CFR 3430.204 - Project types and priorities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE PROVISIONS Specialty Crop Research Initiative § 3430.204 Project types and priorities. For each... projects that are multistate, multi-institutional, and multidisciplinary; and include explicit...

  18. 76 FR 12354 - Cumberland System of Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ... Southeastern Power Administration Cumberland System of Projects AGENCY: Southeastern Power Administration, DOE... applicable to the sale of power from the Cumberland System of Projects effective for a 2-year period, October... applicable to Cumberland System of Projects power for a period ending September 30, 2013 (127 FERC...

  19. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  20. Oral versus intramuscular administration of vitamin B12 for the treatment of patients with vitamin B12 deficiency: a pragmatic, randomised, multicentre, non-inferiority clinical trial undertaken in the primary healthcare setting (Project OB12)

    PubMed Central

    2012-01-01

    Background The oral administration of vitamin B12 offers a potentially simpler and cheaper alternative to parenteral administration, but its effectiveness has not been definitively demonstrated. The following protocol was designed to compare the effectiveness of orally and intramuscularly administered vitamin B12 in the treatment of patients ≥65 years of age with vitamin B12 deficiency. Methods/design The proposed study involves a controlled, randomised, multicentre, parallel, non-inferiority clinical trial lasting one year, involving 23 primary healthcare centres in the Madrid region (Spain), and patients ≥65 years of age. The minimum number of patients required for the study was calculated as 320 (160 in each arm). Bearing in mind an estimated 8-10% prevalence of vitamin B12 deficiency among the population of this age group, an initial sample of 3556 patients will need to be recruited. Eligible patients will be randomly assigned to one of the two treatment arms. In the intramuscular treatment arm, vitamin B12 will be administered as follows: 1 mg on alternate days in weeks 1 and 2, 1 mg/week in weeks 3–8,and 1 mg/month in weeks 9–52. In the oral arm, the vitamin will be administered as: 1 mg/day in weeks 1–8 and 1 mg/week in weeks 9–52. The main outcome variable to be monitored in both treatment arms is the normalisation of the serum vitamin B12 concentration at weeks 8, 26 and 52; the secondary outcome variables include the serum concentration of vitamin B12 (in pg/ml), adherence to treatment, quality of life (EuroQoL-5D questionnaire), patient 3satisfaction and patient preferences. All statistical tests will be performed with intention to treat and per protocol. Logistic regression with random effects will be used to adjust for prognostic factors. Confounding factors or factors that might alter the effect recorded will be taken into account in analyses. Discussion The

  1. Oblique Photogrammetry and Usage on Land Administration

    NASA Astrophysics Data System (ADS)

    Kisa, A.; Ozmus, L.; Erkek, B.; Ates, H. B.; Bakici, S.

    2013-08-01

    Projects based on Geographic Information Systems (GIS) have started within the body of the General Directorate of Land Registry and Cadastre (GDLRC) by the Land Registry and Cadastre Information System (LRCIS) in the beginning of 2000s. LRCIS was followed by other projects which are Turkish National Geographic Information System (TNGIS), Continuously Operating GPS Reference Stations (CORS-TR), Geo Metadata Portal (GMP), Orthophoto Web Services, Completion of Initial Cadastre, Cadastre Renovation Project (CRP), 2B and Land Registry Achieve Information System (LRAIS). When examining the projects generated by GDLRC, it is realized that they include basic functions of land administration required for sustainable development. Sustainable development is obtained through effective land administration as is known. Nowadays, land use becomes more intense as a result of rapid population increase. The importance of land ownership has increased accordingly. At this point, the necessity of cadastre appears. In Turkey, cadastral registration is carried out by the detection of parcels. In other words, it is obtained through the division of land surface into 2D boundaries and mapping of them. However, existing land administration systems have begun to lose their efficiency while coping with rights, restrictions and responsibilities (RRRs) belonging to land which become more complicated day by day. Overlapping and interlocking constructions appear particularly in urban areas with dense housing and consequently, the problem of how to project these structures onto the surface in 2D cadastral systems has arisen. Herein, the necessity of 3D cadastre concept and 3D property data is confronted. In recent years, oblique photogrammetry, whose applications are gradually spreading, is used as an effective method for producing 3D data. In this study, applications of oblique photogrammetry and usability of oblique images as base for 3D Cadastre and Land Administration projects are examined.

  2. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects...

  3. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects...

  4. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects...

  5. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects...

  6. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... National Capital Transportation Amendments of 1979; and (b) The project is a “major capital project”....

  7. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when...

  8. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when...

  9. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when...

  10. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when...

  11. School-Site Administrators: A California County and Regional Perspective on Labor Market Trends. Issues & Answers. REL 2010-No. 084

    ERIC Educational Resources Information Center

    White, Melissa Eiler; Fong, Anthony B.; Makkonen, Reino

    2010-01-01

    This study explores the differences among California's counties and regions in their needs for new school-site administrators in the coming decade, as driven by a combination of projected administrator retirements and projected student enrollment changes. The projected need for new school-site administrators, based solely on these combined…

  12. Astronaut Administrator Richard Truly

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Astronaut Richard H. Truly, pilot of the Space Shuttle Columbia on mission STS-2 and Commander of Shuttle Challenger on mission STS-8, became NASA's eighth Administrator on July 1, 1989. One day earlier he concluded a 30 year Naval career retiring as a Vice Admiral. He was the first astronaut to head the nation's civilian space agency. Truly became Deputy Associate Administrator for Space Flight on February 20, 1986. In this position, he led the painstaking rebuilding of the Space Shuttle program less than one month after the Challenger disaster. This was highlighted by the much heralded 'Return to Flight' on September 29, 1988 with the launch of Shuttle Discovery, 32 months after Challenger's final flight. On February 12th, 1992 Richard Truly resigned as NASA Administrator at the request of President George Bush.

  13. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: FY 1999 Watershed Restoration Projects : Annual Report 1999.

    SciTech Connect

    Robertson, Shawn W.

    2001-03-01

    ) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.

  14. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: Watershed Restoration Projects: Annual Report, 1998.

    SciTech Connect

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    1999-10-01

    conservation projects. The types of projects implemented included installation of a tailwater collection and reuse system, infiltration galleries, permanent diversions, pumping stations, and irrigation upgrades. Project costs in 1998 totaled $891,504.00 with a total amount of $300,329.00 (34%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR) and individual landowners.

  15. Computer hardware fault administration

    DOEpatents

    Archer, Charles J.; Megerian, Mark G.; Ratterman, Joseph D.; Smith, Brian E.

    2010-09-14

    Computer hardware fault administration carried out in a parallel computer, where the parallel computer includes a plurality of compute nodes. The compute nodes are coupled for data communications by at least two independent data communications networks, where each data communications network includes data communications links connected to the compute nodes. Typical embodiments carry out hardware fault administration by identifying a location of a defective link in the first data communications network of the parallel computer and routing communications data around the defective link through the second data communications network of the parallel computer.

  16. MCS Systems Administration Toolkit

    2001-09-30

    This package contains a number of systems administration utilities to assist a team of system administrators in managing a computer environment by automating routine tasks and centralizing information. Included are utilities to help install software on a network of computers and programs to make an image of a disk drive, to manage and distribute configuration files for a number of systems, and to run self-testss on systems, as well as an example of using amore » database to manage host information and various utilities.« less

  17. One-step signal amplified lateral flow strip biosensor for ultrasensitive and on-site detection of bisphenol A (BPA) in aqueous samples.

    PubMed

    Mei, Zhanlong; Qu, Wei; Deng, Yi; Chu, Huaqin; Cao, Jinxuan; Xue, Feng; Zheng, Lei; El-Nezamic, Hani Said; Wu, Yucheng; Chen, Wei

    2013-11-15

    A one-step signal amplified lateral flow strip (LFS) biosensor has been developed for ultrasensitive and on-site visual detection of bisphenol A (BPA). This signal amplified LFS was based on the dual labeling using different-sized gold nanoparticles (Duo-LFS). This Duo-LFS could achieve BPA detection with 0.5 ng/mL as the visual sensitivity by naked eye observation and with 0.076 ng/mL as the limit of detection (LOD) for semi-quantitative detection by software analysis, which is at least 10-fold improvement of the sensitivity of traditional LFS based methods. This one-step signal amplified lateral flow strip biosensor and related signal enhancement method could be adopted as a potential generous technique for all LFS-based detection methods. PMID:23811478

  18. Mapping the literature of nursing administration

    PubMed Central

    Galganski, Carol J.

    2006-01-01

    Objectives: As part of Phase I of a project to map the literature of nursing, sponsored by the Nursing and Allied Health Resources Section of the Medical Library Association, this study identifies the core literature cited in nursing administration and the indexing services that provide access to the core journals. The results of this study will assist librarians and end users searching for information related to this nursing discipline, as well as database producers who might consider adding specific titles to their indexing services. Methods: Using the common methodology described in the overview article, five source journals for nursing administration were identified and selected for citation analysis over a three-year period, 1996 to 1998, to identify the most frequently cited titles according to Bradford's Law of Scattering. From this core of most productive journal titles, the bibliographic databases that provide the best access to these titles were identified. Results: Results reveal that nursing administration literature relies most heavily on journal articles and on those titles identified as core nursing administrative titles. When the indexing coverage of nine services is compared, PubMed/MEDLINE and CINAHL provide the most comprehensive coverage of this nursing discipline. Conclusions: No one indexing service adequately covers this nursing discipline. Researchers needing comprehensive coverage in this area must search more than one database to effectively research their projects. While PubMed/MEDLINE and CINAHL provide more coverage for this discipline than the other indexing services, none is sufficiently broad in scope to provide indexing of nursing, health care management, and medical literature in a single file. Nurse administrators using the literature to research current work issues need to review not only the nursing titles covered by CINAHL but should also include the major weekly medical titles, core titles in health care administration, and

  19. On-Line Administrative Information Systems: A Case Study.

    ERIC Educational Resources Information Center

    Sire, Paul W.

    A case study approach is used to document the on-line information system developed by the Office of Management Information and Computing at the University of Vermont. Stanford University's Project INFO On-Line Administration Information System, OASIS, was chosen as a model. The administrative system is one of two on campus, the other designed for…

  20. Administration of Distance-Teaching Institutions. Case Studies.

    ERIC Educational Resources Information Center

    International Extension Coll., Cambridge (England).

    Designed to supplement the main text, "Administration of Distance-Teaching Institutions," this volume presents 29 case studies of varied distance teaching projects, which are primarily excerpted from published books, journals, and reports, and chosen to illustrate particular themes, such as organization and administration of distance teaching,…

  1. Reflections on Leadership by Nevada School Administrators of Colour.

    ERIC Educational Resources Information Center

    Nelson, Linda, Ed.; Williams, Judith, Ed.

    The seven narratives in this document were drawn from the reflective writings of administrators of color involved in the Nevada Project LEAD. Six school principals and one district administrator describe experiences they have encountered in managing ethnically and racially diverse elementary and secondary schools in Nevada. The first and last…

  2. 77 FR 65679 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Energy Regulatory Commission Southwestern Power Administration; Notice of Filing Take notice that on..., Southwestern Power Administration annual rate for the sale of power and energy from the Willis Project to the Sam Rayburn Municipal Power Agency. Any person desiring to intervene or to protest this filing...

  3. 78 FR 64494 - Southwestern Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Energy Regulatory Commission Southwestern Power Administration; Notice of Filing Take notice that on...), confirmed, approved, and placed in effect on an interim basis in Rate Order SWPA- 67, Southwestern Power Administration annual rate for the sale of power and energy from the Rayburn Project to the Sam Rayburn...

  4. In vitro impact of bisphenols BPA, BPF, BPAF and 17β-estradiol (E2) on human monocyte-derived dendritic cell generation, maturation and function.

    PubMed

    Švajger, Urban; Dolenc, Marija Sollner; Jeras, Matjaž

    2016-05-01

    Bisphenols (BPs) are widely spread pollutants that act as estrogen-like endocrine disruptors and are potentially affecting human health on a long run. We explored the effects of BPA, BPF and BPAF, on in vitro differentiation and maturation of MDDCs. Monocytes were treated with 17β-estradiol (E2) and each BP at the beginning of their differentiation into iMDDCs. We found that 10 and 50 μM of BPA and BPF, 10 and 30μM of BPAF and 10 and 50 nM of E2 did not affect cell viability. However, 50 μM of BPA and BPF, as well as 10 and 30 μM of BPAF, significantly decreased the endocytotic capacity of iMDDCs. Both, BPA (50 μM) and BPAF (30 μM) decreased the expression of CD1a and increased the amount of DC-SIGN molecules on iMDDCs. The E2 pre-treatment moderately decreased expression of CD80, CD86 and CD83 co-stimulatory molecules while increasing the numbers of HLA-DR on mMDDCs. Only BPAF significantly influenced the expression of CD80 and CD86 (both decreased), as well as CD83 and HLA-DR molecules (both increased) on mMDDCs. In addition, BPAF modulated DC maturation signaling pathways by lowering the phosphorylation of p65 NF-κB (nuclear factor-kappaB) and ERK (extracellular signal regulated kinase) 1/2 proteins. Consequently, the in vitro proliferation of allogeneic T cells, stimulated with differently pre-treated iMDDCs and mMDDCs, was significantly reduced only in case of BPAF. PMID:26945833

  5. Comparing different gas chromatographic methods for the quantification of bisphenol A (BPA) trace levels in paper and cardboard products from the market.

    PubMed

    Jurek, A; Leitner, E

    2015-01-01

    Bisphenol A (BPA; 4,4'-(propane-2,2-diyl)diphenol), a suspected endocrine disruptor with weak estrogenic activity, is used in a variety of consumer products, including paper and cardboard products used as food contact materials. The present study compared four different gas chromatographic methods for the analysis of BPA in paper and cardboard food packages. Eighteen different food packages were extracted and BPA was determined using two different derivatisation reactions--trimethylsilylation with N,O-bis(trimethylsilyl) trifluoroacetamide (BSTFA) and halide alkylation with pentafluorobenzoyl chloride (PFBOCl)--and four different separation and detection techniques. The BSTFA derivatives were quantified with (1) GC-MS in single-ion monitoring (SIM) mode with electron ionisation (EI-GC-MS) and (2) GC-MS/MS in multiple reaction monitoring (MRM) mode using electron ionisation (EI-GC-MS/MS); while the PFBOCl derivatives were quantified with (3) GC-MS using electron ionisation (EI-GC-MS) as well as (4) GC-MS with negative chemical ionisation (NCI-GC-MS). All developed methods showed good linearity (R(2) > 0.9938), precision (CV < 4.5% for reproducibility; CV < 2.2% for repeatability) and sensitivity, with limits of detection (LODs) between 0.02 µg kg(-1) for the pentafluorobenzoyl derivatives measured with the NCI-GC-MS method and 6 µg kg(-1) for the pentafluorobenzoyl derivatives determined with EI-GC-MS. Levels of BPA in the samples were in agreement for all methods, ranging from values below the limit of quantitation (LOQ) to 11.9 mg kg(-1) paper. In a last step, the maximum potential migration into food products was calculated for all tested paper and cardboard samples, assuming a 'worst case' scenario of 100% migration. PMID:26029846

  6. Additive effect of BPA and Gd-DTPA for application in accelerator-based neutron source.

    PubMed

    Yoshida, F; Yamamoto, T; Nakai, K; Zaboronok, A; Matsumura, A

    2015-12-01

    Because of its fast metabolism gadolinium as a commercial drug was not considered to be suitable for neutron capture therapy. We studied additive effect of gadolinium and boron co-administration using colony forming assay. As a result, the survival of tumor cells with additional 5 ppm of Gd-DTPA decreased to 1/10 compared to the cells with boron only. Using gadolinium to increase the effect of BNCT instead of additional X-ray irradiation might be beneficial, as such combination complies with the short-time irradiation regimen at the accelerator-based neutron source. PMID:26242560

  7. Telecommunications administration standard

    SciTech Connect

    Gustwiller, K.D.

    1996-05-01

    The administration of telecommunications is critical to proper maintenance and operation. The intent is to be able to properly support telecommunications for the distribution of all information within a building/campus. This standard will provide a uniform administration scheme that is independent of applications, and will establish guidelines for owners, installers, designers and contractors. This standard will accommodate existing building wiring, new building wiring and outside plant wiring. Existing buildings may not readily adapt to all applications of this standard, but the requirement for telecommunications administration is applicable to all buildings. Administration of the telecommunications infrastructure includes documentation (labels, records, drawings, reports, and work orders) of cables, termination hardware, patching and cross-connect facilities, telecommunications rooms, and other telecommunications spaces (conduits, grounding, and cable pathways are documented by Facilities Engineering). The investment in properly documenting telecommunications is a worthwhile effort. It is necessary to adhere to these standards to ensure quality and efficiency for the operation and maintenance of the telecommunications infrastructure for Sandia National Laboratories.

  8. Study Shows Administrative Shortage.

    ERIC Educational Resources Information Center

    Sullivan, John R., Jr.

    1989-01-01

    Summarizes "Administrative Shortage in New England: The Evidence, the Causes, the Recommendations." High pressure, long hours, low salaries, and high housing costs are among the reasons cited for the shortage. Recommendations are centered on role identity, staff support, training, and recruitment. (SI)

  9. Central Administration. Interim Report.

    ERIC Educational Resources Information Center

    Duke Univ., Durham, NC.

    Because the configuration of the central administration of Duke University has recently been modified, this report was prepared: (1) to describe the changes and rearrangements thus far introduced; (2) to propose desirable clarifications not yet provided; (3) to recommend certain additional changes where these may already appear to be needed; and…

  10. Guidebook for School Administrators.

    ERIC Educational Resources Information Center

    Hess, Fritz, Ed.

    To provide guidance and advice regarding day-to-day responsibilities of new and experienced school administrators and superintendents in New York State, this compendium of knowledge and advice submitted by practitioners is presented with emphasis on all major aspects of superintendency. The section on general aspects of superintendency includes…

  11. Redis database administration tool

    2013-02-13

    MyRedis is a product of the Lorenz subproject under the ASC Scirntific Data Management effort. MyRedis is a web based utility designed to allow easy administration of instances of Redis databases. It can be usedd to view and manipulate data as well as run commands directly against a variety of different Redis hosts.

  12. Female Administrator Acceptance.

    ERIC Educational Resources Information Center

    Pawlitschek, Elizabeth Ann

    The number of women in educational administration is declining, despite official efforts to end sex discrimination. Women are hampered on the way to obtaining an adequate education, finding roadblocks from sex bias in elementary readers to discrimination in graduate programs; are considered responsible for home and children even when working full…

  13. Hospital Library Administration.

    ERIC Educational Resources Information Center

    Cramer, Anne

    The objectives of a hospital are to improve patient care, while the objectives of a hospital library are to improve services to the staff which will support their efforts. This handbook dealing with hospital administration is designed to aid the librarian in either implementing a hospital library, or improving services in an existing medical…

  14. [Rural School Administrator's Resources.

    ERIC Educational Resources Information Center

    AEL, Inc., Charleston, WV.

    This packet contains resources on five topics relevant to rural school administrators. "Assessing Parent Involvement: A Checklist for Rural Schools": discusses educator beliefs that support successful parent engagement programs, challenges and advantages of rural schools attempting to involve parents and community, and aspects of successful…

  15. Information for School Administrators.

    ERIC Educational Resources Information Center

    Kowitz, Gerald T.; And Others

    Modern management theory, based on the reduction of uncertainties, demands the collection and manipulation of large amounts of information. School Administrators choke in the process of trying to digest a proliferation of data, only some of which are useful. The aims of the study were to explore the extent to which large amounts of data could be…

  16. Research Administration: Lessons Learned.

    ERIC Educational Resources Information Center

    Dummer, George H.

    1995-01-01

    The ways in which accountability issues have affected federal-university relationships, particularly in the area of academic research, are examined. Lessons university administrators have learned since issuance of Office of Management and Budget Circular A-21 in 1958, Congressional hearings on the operations of the National Institutes of Health…

  17. Administrators Confront Student "Sexting"

    ERIC Educational Resources Information Center

    Manzo, Kathleen Kennedy

    2009-01-01

    Cellphone-savvy students have created instructional and disciplinary challenges for educators for years. But the recent emergence of "sexting" by adolescents over their mobile phones caught many school administrators off guard, and the practice is prompting efforts around the country to craft policy responses. Students' sharing of nude or…

  18. Championing the Latino Administrator

    ERIC Educational Resources Information Center

    Garcia, Carlos A.

    2011-01-01

    When the author worked as a vice principal at a K-8 school in Watsonville, California, a school predominantly filled with migrant workers' children, he felt a lack of support as a Latino as he began moving up into school administration. He also continued to see what he had seen as a teacher--which was how underserved minority students were. These…

  19. Hispanic Administrators in Kentucky

    ERIC Educational Resources Information Center

    Ballestero, Victor; Wright, Sam

    2008-01-01

    The study was designed to provide information on Hispanic administrators in the Commonwealth of Kentucky. The data was obtained from Kentucky school Superintendents or their designees in 175 public school districts. The Hispanic survey contained six questions. The survey was mailed to Kentucky Superintendents on April 21, 2008. A follow-up survey…

  20. Educational Administration's Weber.

    ERIC Educational Resources Information Center

    Gronn, Peter

    1994-01-01

    Discusses Max Weber's importance in Greenfield's work, particularly in Greenfield and Ribbins'"Greenfield on Educational Administration" (1993). In concentrating on human actors' subjective understanding, Greenfield was a faithful Weberian. However, he deviated from Weber by disavowing structural explanations of social and organizational…