Science.gov

Sample records for administration burley substation

  1. 7. VIEW SHOWING SOUTH SIDE OF BURLEY SUBSTATION WITH DRYCLEANERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW SHOWING SOUTH SIDE OF BURLEY SUBSTATION WITH DRYCLEANERS IN FOREGROUND AND SIDE OF SUBSTATION WITH BREAK BETWEEN 1913-1914 AND 1921 CONSTRUCTION PHASES IN BACKGROUND - Bonneville Power Administration Burley Substation, 1221 Albion Avenue, Burley, Cassia County, ID

  2. 11. INTERIOR VIEW OF BURLEY SUBSTATION, SECOND STORY, LOOKING EAST, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR VIEW OF BURLEY SUBSTATION, SECOND STORY, LOOKING EAST, SHOWING PARTITIONS, POURED-IN-PLACE CONCRETE ROOF AND WATER- DAMAGED SOUTH WALL (BREAK BETWEEN 1913-1914 AND 1921 CONSTRUCTION PHASES IN FOREGROUND) - Bonneville Power Administration Burley Substation, 1221 Albion Avenue, Burley, Cassia County, ID

  3. 3. VIEW SHOWING FRONT HALF OF NORTH SIDE OF BURLEY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW SHOWING FRONT HALF OF NORTH SIDE OF BURLEY SUBSTATION, LOOKING SOUTHWEST. BREAK BETWEEN 1913-1914 AND 1921 CONSTRUCTION PHASES, LOCATED BELOW AND ABOVE RIGHT EDGE OF SECOND WINDOW, FRONT LEFT OF PHOTOGRAPH - Bonneville Power Administration Burley Substation, 1221 Albion Avenue, Burley, Cassia County, ID

  4. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  5. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  6. Wolf Point Substation, Roosevelt County, Montana

    SciTech Connect

    Not Available

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

  7. 3. Photocopy of photograph ('Town and Community Planning, Walter Burley ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photocopy of photograph ('Town and Community Planning, Walter Burley Griffin,' Western Architect, Vol. 19, No. 8, August, 1913, following page 80) ca 1913 MAIN FACADE AND GARAGE FACADE - Arthur L. Rule House, 11 South Rock Glen, Mason City, Cerro Gordo County, IA

  8. Ashland Area Support Substation Project

    SciTech Connect

    Not Available

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  9. Substation voltage upgrading

    SciTech Connect

    Panek, J.; Elahi, H.; Sublich, M. . Systems Development and Engineering Dept.)

    1989-08-01

    Substation voltage uprating, i.e., conversion of a substation from a lower rated voltage to a higher rated voltage without a complete substation rebuild, can lead to excellent economic benefits. Utilization of the old substation layout and/or the existing equipment, to some extent, is the practical objective of such an uprating. The objective of this project was to assess the opportunities for substation uprating in the industry, to establish feasibility for such uprating and to study methods for accomplishing it. The final aim of the project was to provide guidance to utilities interested in uprating. 56 refs., 41 figs., 18 tabs.

  10. 7 CFR 29.75a - Display of burley tobacco on auction warehouse floors in designated markets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Display of burley tobacco on auction warehouse floors... § 29.75a Display of burley tobacco on auction warehouse floors in designated markets. (a)(1) Each lot of burley tobacco displayed for sale on auction warehouse floors shall have a minimum space of...

  11. Substation voltage upgrading

    SciTech Connect

    Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. . Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. )

    1992-04-01

    This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

  12. 20 CFR 631.51 - Allowable substate program activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Allowable substate program activities. 631.51 Section 631.51 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.51 Allowable...

  13. 20 CFR 631.51 - Allowable substate program activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Allowable substate program activities. 631.51 Section 631.51 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.51 Allowable...

  14. 20. Photocopy of photograph showing the completed South Bank Substation, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of photograph showing the completed South Bank Substation, 4 November 1939 (from the BPA Photo Archives, Negative No. 6556), LOOKING NORTHWEST WITH THE BONNEVILLE DAM POWERHOUSE AND TRANSMISSION TOWERS IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  15. 17. Photocopy of photograph showing excavation of South Bank Substation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of photograph showing excavation of South Bank Substation site, 15 May 1939 (from the BPA Photo Archives, Portland, Oregon, Negative No. 345), LOOKING WEST - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  16. Ashland Area Support Substation Project : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power & Light Company`s (PP&L) 115-kilovolt (kV) transmission lines and through PP&L`s Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP&L to allow transfer of three megawatts (MW`s) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP&L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  17. 7 CFR 29.75a - Display of burley tobacco on auction warehouse floors in designated markets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Display of burley tobacco on auction warehouse floors... COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS TOBACCO INSPECTION Regulations Mandatory Inspection § 29.75a Display of burley tobacco on auction warehouse floors in designated markets. (a)(1) Each...

  18. 7 CFR 29.75a - Display of burley tobacco on auction warehouse floors in designated markets.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Display of burley tobacco on auction warehouse floors... COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS TOBACCO INSPECTION Regulations Mandatory Inspection § 29.75a Display of burley tobacco on auction warehouse floors in designated markets. (a)(1) Each...

  19. PUREX new substation ATR

    SciTech Connect

    Nelson, D.E.

    1997-05-12

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.

  20. REPORT ON WASTE SOURCE MONITORING IN THE BURLEY, IDAHO AREA, 1974

    EPA Science Inventory

    At the request of EPA Region 10, NFIC-D conducted waste source monitoring in the Burley, Idaho area (17040209) from October 21-28, 1974 to provide an input to the water quality predictive mathematical model which covers the Milner Reservoir reach of the Snake River. Each waste s...

  1. 30 CFR 77.811 - Movement of portable substations and transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of portable substations and transformers. 77.811 Section 77.811 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... and transformers. Portable substations and transformers shall be deenergized before they are...

  2. Electric power substation capital costs

    SciTech Connect

    Dagle, J.E.; Brown, D.R.

    1997-12-01

    The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

  3. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  4. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  5. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  6. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  7. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  8. 20 CFR 631.50 - Substate plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Substate plan. 631.50 Section 631.50... THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.50 Substate plan. (a) In order to receive an... plan, in accordance with instructions issued by the Governor. Such plan shall meet the requirements...

  9. A Quantitative Real-Time PCR-Based Strategy for Molecular Evaluation of Nicotine Conversion in Burley Tobacco

    PubMed Central

    Sun, Bo; Xue, Sheng-Ling; Zhang, Fen; Luo, Zhao-Peng; Wu, Ming-Zhu; Chen, Qing; Tang, Hao-Ru; Lin, Fu-Cheng; Yang, Jun

    2015-01-01

    Nornicotine production in Nicotiana tabacum is undesirable because it is the precursor of the carcinogen N′-nitrosonornicotine. In some individual burley tobacco plants, a large proportion of the nicotine can be converted to nornicotine, and this process of nicotine conversion is mediated primarily by enzymatic N-demethylation of nicotine which is controlled mainly by CYP82E4. Here we report a novel strategy based on quantitative real-time polymerase chain reaction (qPCR) method, which analyzed the ratio of nicotine conversion through examining the transcript level of CYP82E4 in burley leaves and do not need ethylene induction before detected. The assay was linear in a range from 1 × 101 to 1 × 105 copies/mL of serially diluted standards, and also showed high specificity and reproducibility (93%–99%). To assess its applicability, 55 plants of burley cultivar Ky8959 at leaf maturing stage were analyzed, and the results were in accordance with those from gas chromatograph-mass spectrometry (GC-MS) method. Moreover, a linear correlation existed between conversion level and CYP82E4 transcript abundance. Taken together, the quantitative real-time PCR assay is standardized, rapid and reproducible for estimation of nicotine conversion level in vivo, which is expected to shed new light on monitoring of burley tobacco converter. PMID:26593897

  10. Transient electromagnetic interference in substations

    SciTech Connect

    Wiggins, C.M.; Thomas, D.E.; Nickel, F.S.; Salas, T.M. ); Wright, S.E. )

    1994-10-01

    Electromagnetic interference levels on sensitive electronic equipment are quantified experimentally and theoretically in air and gas insulated substations of different voltages. Measurement techniques for recording interference voltages and currents and electric and magnetic fields are reviewed and actual interference data are summarized. Conducted and radiated interference coupling mechanisms and levels in substation control wiring are described using both measurement results and electromagnetic models validated against measurements. The nominal maximum field and control wire interference levels expected in the switchyard and inside the control house from switching operations, faults, and an average lightning strike are estimated using high frequency transient coupling models. Comparisons with standards are made and recommendations given concerning equipment shielding and surge protection.

  11. Noise around electrical energy substations

    NASA Astrophysics Data System (ADS)

    Diniz, Fabiano B.; Zannin, Paulo H.

    2005-09-01

    This survey is intended to characterize the noise impact due to electrical energy substations in the city of Curitiba over the population living in their vicinity. This impact has been studied with the aid of a computational tool capable of mapping the acoustical field of substations and their vicinity. Several factors have been considered in this survey: sound power of the transformers; vehicle flow on the surrounding roads; positioning of the firewalls, of the buildings and of the walls; terrain topography. Seven substations have been analyzed, and acoustical maps have been traced for each of them for the day and night periods. With these maps it was possible to visualize what was the incident noise levels on the building facades. The predicted noise levels have been compared to the environmental legislation of the noise emissions in effect in the city. Finally the construction of noise barrier walls surrounding the transformers has been simulated, via the software, for some cases, in order to evaluate the reduction on the acoustical discomfort caused by the transformers over the neighborhood population.

  12. Determination of free amino acids in burley tobacco by high performance liquid chromatography

    PubMed Central

    Jing, Yanqiu; Zhang, Baolin; Yuan, Xiuxiu; Gao, Yuzhen; Lu, Ping; Wang, Weifeng; Xu, Min

    2015-01-01

    A reversed-phase high performance liquid chromatographic method was developed for determining free amino acids in burley tobacco. The test was done by OPA/3-mercaptopropionic acid as the pre-column derivatizing reagent. Chromatographic column was Elitte C18 column (4.6 mm × 250 mm i.d., 5 μm). Mobile phase A was 18 mol/l NaAc (pH7.2) including 0.002%(v/v) triethylamine and 0.3%(v/v) furanidine. Mobile phase B was 100 mol/l NaAc (pH7.2)–acetonitrile–methanol (v/v = 1:2:2). The column temperature was 40 °C and the flow rate was 1.0 ml/min. The fluorescence detector was used with 350 nm excitation wave length and 450 nm emission wave length. The average recoveries of the method ranged from 95.3–100.7% with the relative standard deviation of 2.32–9.24%. The method is simple, accurate and has good repeatability. The results of the determination of seventeen kinds of free amino acids in burley leaves were produced by the way of different ratios of cake fertilizer and inorganic fertilizer. The results show that Aspartic acid has the highest content however ratio of cake fertilizer and inorganic fertilizer. The contents of most of the free amino acids are increased and then gradually decreased with the increase in organic manure. The contents of most of the free amino acids are very close at 15:85% ratio and 30:70% ratio of cake fertilizer and inorganic fertilizer. The total amount of free amino acids is the highest at 30:70% ratio of cake fertilizer and inorganic fertilizer. Considering comprehensively, the quality of burley leaves is the best at 30:70% ratio of cake fertilizer and inorganic fertilizer. PMID:26858568

  13. Determination of free amino acids in burley tobacco by high performance liquid chromatography.

    PubMed

    Jing, Yanqiu; Zhang, Baolin; Yuan, Xiuxiu; Gao, Yuzhen; Lu, Ping; Wang, Weifeng; Xu, Min

    2016-01-01

    A reversed-phase high performance liquid chromatographic method was developed for determining free amino acids in burley tobacco. The test was done by OPA/3-mercaptopropionic acid as the pre-column derivatizing reagent. Chromatographic column was Elitte C(18) column (4.6 mm × 250 mm i.d., 5 μm). Mobile phase A was 18 mol/l NaAc (pH7.2) including 0.002%(v/v) triethylamine and 0.3%(v/v) furanidine. Mobile phase B was 100 mol/l NaAc (pH7.2)-acetonitrile-methanol (v/v = 1:2:2). The column temperature was 40 °C and the flow rate was 1.0 ml/min. The fluorescence detector was used with 350 nm excitation wave length and 450 nm emission wave length. The average recoveries of the method ranged from 95.3-100.7% with the relative standard deviation of 2.32-9.24%. The method is simple, accurate and has good repeatability. The results of the determination of seventeen kinds of free amino acids in burley leaves were produced by the way of different ratios of cake fertilizer and inorganic fertilizer. The results show that Aspartic acid has the highest content however ratio of cake fertilizer and inorganic fertilizer. The contents of most of the free amino acids are increased and then gradually decreased with the increase in organic manure. The contents of most of the free amino acids are very close at 15:85% ratio and 30:70% ratio of cake fertilizer and inorganic fertilizer. The total amount of free amino acids is the highest at 30:70% ratio of cake fertilizer and inorganic fertilizer. Considering comprehensively, the quality of burley leaves is the best at 30:70% ratio of cake fertilizer and inorganic fertilizer. PMID:26858568

  14. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  15. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  16. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  17. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  18. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  19. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  20. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  1. Experimental adoption of RCM in EDF substations

    SciTech Connect

    Heroin, G.; Aupied, J.; Sanchis, G.

    1996-08-01

    EDF, after testing Reliability Centered Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF`s policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment - frequency and seriousness - and two criteria for maintenance task selection - efficiency and facility. The final outcome of RCM as applied to substation maintenance is to categorize maintenance tasks into: (1) essential maintenance tasks, (2) optional tasks, depending on the type and location of the substation, as well as on factors relating to local management of maintenance policy, and (3) unnecessary tasks.

  2. Gas insulated substation equipment for industrial applications

    SciTech Connect

    Kenedy, J.J.

    1984-11-01

    Until recently the only available method for construction of high voltage systems was to use exposed air insulated equipment supported on porcelain columns. The past decade has witnessed the introduction and wide acceptance of compressed gas insulated equipment as a viable alternative to the conventional substation system. The characteristics of gas insulated substations (GIS) and their application for industrial use at service voltages at 69 kV and above are discussed.

  3. View of EPA Farm power substation, facing westsouthwest Nevada ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of EPA Farm power substation, facing west-southwest - Nevada Test Site, Environmental Protection Agency Farm, Power Substation, Area 15, Yucca Flat, 10-2 Road near Circle Road, Mercury, Nye County, NV

  4. Operation Modes of HV/MV Substations

    NASA Astrophysics Data System (ADS)

    Survilo, Josifs; Kutjuns, Antons

    2009-01-01

    A distribution network consists of high voltage grid, medium voltage grid, and low voltage grid. Medium voltage grid is connected to high voltage grid via substations with HV/MV transformers. The substation may contain one, mostly two but sometimes even more transformers. Out of reliability and expenditure considerations the two transformer option prevail over others mentioned. For two transformer substation, there may be made choice out of several operation modes: 1) two (small) transformers, with rated power each over 0.7 of maximum substation load, permanently in operation; 2) one (big) transformer, with rated power over maximum substation load, permanently in operation and small transformer in constant cold reserve; 3) big transformer in operation in cold season, small transformer-in warm one. Considering transformer load losses and no load losses and observing transformer loading factor β it can be said that the mode 1) is less advantageous. The least power losses has the mode 3). There may be singled out yet three extra modes of two transformer substations: 4) two big transformers in permanent operation; 5) one big transformer permanently in operation and one such transformer in cold reserve; 6) two small transformers in operation in cold season of the year, in warm season-one small transformer on duty. At present mostly two transformers of equal power each are installed on substations and in operation is one of them, hence extra mode 5). When one transformer becomes faulty, it can be changed for smaller one and the third operation mode can be practiced. Extra mode 4) is unpractical in all aspects. The mode 6) has greater losses than the mode 3) and is not considered in detail. To prove the advantage of the third mode in sense of power losses, the notion of effective utilization time of power losses was introduced and it was proven that relative value of this quantity diminishes with loading factor β. The use of advantageous substation option would make it

  5. Using Immersive Virtual Reality for Electrical Substation Training

    ERIC Educational Resources Information Center

    Tanaka, Eduardo H.; Paludo, Juliana A.; Cordeiro, Carlúcio S.; Domingues, Leonardo R.; Gadbem, Edgar V.; Euflausino, Adriana

    2015-01-01

    Usually, distribution electricians are called upon to solve technical problems found in electrical substations. In this project, we apply problem-based learning to a training program for electricians, with the help of a virtual reality environment that simulates a real substation. Using this virtual substation, users may safely practice maneuvers…

  6. Environment and protection of a gas-insulated substation

    SciTech Connect

    Koepfinger, J.L.; Lauth, W.C.

    1980-01-01

    Unlike a conventional open-air designed substation, the environment of a gas-insulated substation (GIS) is under the control of the designer and operator. This is a feature that can be utilized by the protection engineer to develop a protective scheme for the substation. A discussion is provided to develop a fault anticipation protection scheme.

  7. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  8. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  9. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  10. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  11. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  12. Proceedings: Substation equipment diagnostics conference 5

    SciTech Connect

    Nilsson, S.L.

    1998-09-01

    The report contains the collections of papers presented at the conference and an abbreviated and edited record of the informal discussions of the papers and presentations. The record covers an introductory plenary session, technical contributions for maintenance and diagnostic of transformers, breakers and other substation equipment and systems plus an edited transcript of the summary session held at the end of the conference.

  13. Dimensioning of nearby substations interconnected ground system

    SciTech Connect

    Sobral, S.T. ); Costa, V.S. ); Campos, M.S.; Goldman, B. ); Mukhedkar, D. )

    1988-10-01

    This paper deals with the ground mat dimensioning of two or more neighbor interconnected substations, a situation that is very common in the Electrical Industry. The paper recalls that the external ground circuits connected to the ground grid of each substation can drastically reduce the percentage of total ground current injected into the soil through the mat (from 40% up to 2% of the total fault current). The paper presents a set of specific calculation procedures to deal with nearby interconnected ground mats. These procedures correspond to a particular illustration of the general ''Decoupled Method'' (3,4,5), showing how to apply its 8 sequencial steps to solve this type of circuit. The paper shows that the electric neighborhood of nearby substations depends on the ''Space Constant'' (or ''Characteristic Length'') of the ground circuits interconnecting them such as transmission line ground-wires, power cable sheaths, etc. This paper complements also Ref. (3,4), introducing the complete derivation of useful expressions used to solve lumped parameter ladder circuits of any size (from one pi to an infinite number of pis). The derivation of these expressions also used in (3,4) were not included in these References due to lack of space. In the paper it is also shown a simple procedure to determine the suitable number of ACSR ground-wire spans near a substation necessary to allow a reduction of the ground grid conductor extension.

  14. 78 FR 60273 - Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild, Grand County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ...Western Area Power Administration (Western), a power marketing administration in the U.S. Department of Energy (DOE), owns and operates the 69-kilovolt (kV) Granby Pumping Plant Switchyard-Windy Gap Substation (Project) transmission line in Grand County, Colorado. The transmission line is 13.6 miles long. Western proposes to rebuild the single-circuit line as a double-circuit line, increase......

  15. Neural networks for fault location in substations

    SciTech Connect

    Alves da Silva, A.P.; Silveira, P.M. da; Lambert-Torres, G.; Insfran, A.H.F.

    1996-01-01

    Faults producing load disconnections or emergency situations have to be located as soon as possible to start the electric network reconfiguration, restoring normal energy supply. This paper proposes the use of artificial neural networks (ANNs), of the associative memory type, to solve the fault location problem. The main idea is to store measurement sets representing the normal behavior of the protection system, considering the basic substation topology only, into associated memories. Afterwards, these memories are employed on-line for fault location using the protection system equipment status. The associative memories work correctly even in case of malfunction of the protection system and different pre-fault configurations. Although the ANNs are trained with single contingencies only, their generalization capability allows a good performance for multiple contingencies. The resultant fault location system is in operation at the 500 kV gas-insulated substation of the Itaipu system.

  16. Surge propagation in gas insulated substation

    SciTech Connect

    Matsumura, S.; Nitta, T.

    1981-06-01

    Surge propagation performance in a 550 kV gas insulated substation is studied experimentally and by computer simulation using the Electro-Magnetic Transients Program. Extra capacitance added to the system by the components of GIS such as potential devices, branch buses, circuit breakers deform the wave shape of the travelling surges. A simple modeling technique to represent GIS in surge analysis is proposed and its applicability is proved. Paper No. 80 SM 658-5.

  17. Modeling and Simulating Blast Effects on Electric Substations

    SciTech Connect

    Lyle G. Roybal; Robert F. Jeffers; Kent E. McGillivary; Tony D. Paul; Ryan Jacobson

    2009-05-01

    A software simulation tool was developed at the Idaho National Laboratory to estimate the fragility of electric substation components subject to an explosive blast. Damage caused by explosively driven fragments on a generic electric substation was estimated by using a ray-tracing technique to track and tabulate fragment impacts and penetrations of substation components. This technique is based on methods used for assessing vulnerability of military aircraft and ground vehicles to explosive blasts. An open-source rendering and ray-trace engine was used for geometric modeling and interactions between fragments and substation components. Semi-empirical material interactions models were used to calculate blast parameters and simulate high-velocity material interactions between explosively driven fragments and substation components. Finally, a Monte Carlo simulation was added to model the random nature of fragment generation allowing a skilled analyst to predict failure probabilities of substation components.

  18. Knowledge engineering tool for training power-substation operators

    SciTech Connect

    Lambert-Torres, G. |; Costa, C.I.A.; Alves da Silva, A.P.; Ribeiro, G.M.; Quintana, V.H.

    1997-04-01

    Artificial intelligence techniques have been applied to create systems that can give answers for different situations and assistance during the substation switching operation. These techniques have also been used for training purposes. This paper presents a computational package for training power substation operators in the control and corrective actions using expert system techniques. Illustrative examples are presented using a 138-kV CEMIG substation.

  19. 9. STATION 'L', LOOKING NORTHWEST FROM SOUTHEAST DIVISION, LINCOLN SUBSTATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. STATION 'L', LOOKING NORTHWEST FROM SOUTHEAST DIVISION, LINCOLN SUBSTATION IN FOREGROUND - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  20. Applications of new technology in power substations

    SciTech Connect

    Burnett, R.O. Jr. ); Murphy, R.J. )

    1990-04-01

    Computer technology offers significant advances in terms of data handling capabilities and storage. This paper describes the applications of some of the more modern technologies to instruments designed specifically to operate in utility substation environments. Emphasis is placed on the use of CMOS logic, processor and memory circuits, high density flexible magnetic disk media, and high capacity Winchester technology storage devices. The operating history of a number of units over a five year period are reported, as well as the steps taken to protect these devices in a hostile environment. In addition, areas requiring specific improvement and adaptation are noted.

  1. Environmental Assessment : Happy Valley [Substation Project].

    SciTech Connect

    United States. Bonneville Power Administration.

    1982-05-01

    The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

  2. Screening level characterization of electrical Substation 411

    SciTech Connect

    Not Available

    1990-11-01

    Substation 411 transformer dielectric fluids were sampled for uranium and PCBs. The exterior surfaces of the metal transformers were measured for radioactivity. Results of the sampling revealed that some transformer fluid contained PCBs, but no uranium in excess of naturally occurring amounts was detected. In addition, the exterior surface of the transformers were uncontaminated. Subject to measurement of the base of the transformers (which were inaccessible during the surface scans for radioactivity), the transformers and dielectric fluids may be removed from the site for disposal. Two appendices are included: (a) a sampling plan, and (b) soil lab reports.

  3. 69. 129 HILLSIDE AVENUE, BRONX, SUBSTATION, D. C. SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    69. 129 HILLSIDE AVENUE, BRONX, SUBSTATION, D. C. SIDE OF ROTARY VISIBLE-NOTE COPPER BRUSHES IN PLACE OF SLIP RINGS. THE THREE TRANSFORMER '5'S REDUCE VOLTAGE OF CURRENT PASSING TO ROTARY '5'. NOTE ROTARY CONVERTER MOUNTED IN HARDWOOD BASE INDEPENDENT OF SUBSTATION FLOOR. - Interborough Rapid Transit Subway (Original Line), New York County, NY

  4. Discovering conformational sub-states relevant to protein function

    SciTech Connect

    Agarwal, Pratul K; Ramanathan, Arvind

    2011-01-01

    Internal motions enable proteins to explore a range of conformations, even in the vicinity of native state. The role of conformational fluctuations in the designated function of a protein is widely debated. Emerging evidence suggests that sub-groups within the range of conformations (or sub-states) contain properties that may be functionally relevant. However, low populations in these sub-states and the transient nature of conformational transitions between these sub-states present significant challenges for their identification and characterization. To overcome these challenges we have developed a new computational technique, quasi-anharmonic analysis (QAA). QAA utilizes higher-order statistics of protein motions to identify sub-states in the conformational landscape. Further, the focus on anharmonicity allows identification of conformational fluctuations that enable transitions between sub-states. QAA applied to equilibrium simulations of human ubiquitin and T4 lysozyme reveals functionally relevant sub-states and protein motions involved in molecular recognition. In combination with a reaction pathway sampling method, QAA characterizes conformational sub-states associated with cis/trans peptidyl-prolyl isomerization catalyzed by the enzyme cyclophilin A. In these three proteins, QAA allows identification of conformational sub-states, with critical structural and dynamical features relevant to protein function. Overall, QAA provides a novel framework to intuitively understand the biophysical basis of conformational diversity and its relevance to protein function.

  5. Protection of gas insulated substations against lightning overvoltages

    NASA Astrophysics Data System (ADS)

    Bernard, G.

    1982-08-01

    Selection of protection devices (air gaps, open arresters, encapsulated arresters) and their locations so as to bring lightning overvoltages below tolerances for electricity substations is discussed. A calculation method for evaluating the statistical risk of these tolerances being exceeded is presented. Methods for representing substation system elements in computerized simulation models are outlined.

  6. Discovering Conformational Sub-States Relevant to Protein Function

    PubMed Central

    Ramanathan, Arvind; Savol, Andrej J.; Langmead, Christopher J.; Agarwal, Pratul K.; Chennubhotla, Chakra S.

    2011-01-01

    Background Internal motions enable proteins to explore a range of conformations, even in the vicinity of native state. The role of conformational fluctuations in the designated function of a protein is widely debated. Emerging evidence suggests that sub-groups within the range of conformations (or sub-states) contain properties that may be functionally relevant. However, low populations in these sub-states and the transient nature of conformational transitions between these sub-states present significant challenges for their identification and characterization. Methods and Findings To overcome these challenges we have developed a new computational technique, quasi-anharmonic analysis (QAA). QAA utilizes higher-order statistics of protein motions to identify sub-states in the conformational landscape. Further, the focus on anharmonicity allows identification of conformational fluctuations that enable transitions between sub-states. QAA applied to equilibrium simulations of human ubiquitin and T4 lysozyme reveals functionally relevant sub-states and protein motions involved in molecular recognition. In combination with a reaction pathway sampling method, QAA characterizes conformational sub-states associated with cis/trans peptidyl-prolyl isomerization catalyzed by the enzyme cyclophilin A. In these three proteins, QAA allows identification of conformational sub-states, with critical structural and dynamical features relevant to protein function. Conclusions Overall, QAA provides a novel framework to intuitively understand the biophysical basis of conformational diversity and its relevance to protein function. PMID:21297978

  7. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  8. Substation voltage upgrading. Volume 2, Substation insulation tests and design for fast front lightning impulses: Final report

    SciTech Connect

    Panek, J.; Elahi, H.; Lux, A.; Imece, A.F.; LaPanse, R.A.; Stewart, J.R.

    1992-04-01

    This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

  9. Study on Noise Prediction Model and Control Schemes for Substation

    PubMed Central

    Gao, Yang; Liu, Songtao

    2014-01-01

    With the government's emphasis on environmental issues of power transmission and transformation project, noise pollution has become a prominent problem now. The noise from the working transformer, reactor, and other electrical equipment in the substation will bring negative effect to the ambient environment. This paper focuses on using acoustic software for the simulation and calculation method to control substation noise. According to the characteristics of the substation noise and the techniques of noise reduction, a substation's acoustic field model was established with the SoundPLAN software to predict the scope of substation noise. On this basis, 4 reasonable noise control schemes were advanced to provide some helpful references for noise control during the new substation's design and construction process. And the feasibility and application effect of these control schemes can be verified by using the method of simulation modeling. The simulation results show that the substation always has the problem of excessive noise at boundary under the conventional measures. The excess noise can be efficiently reduced by taking the corresponding noise reduction methods. PMID:24672356

  10. Study on noise prediction model and control schemes for substation.

    PubMed

    Chen, Chuanmin; Gao, Yang; Liu, Songtao

    2014-01-01

    With the government's emphasis on environmental issues of power transmission and transformation project, noise pollution has become a prominent problem now. The noise from the working transformer, reactor, and other electrical equipment in the substation will bring negative effect to the ambient environment. This paper focuses on using acoustic software for the simulation and calculation method to control substation noise. According to the characteristics of the substation noise and the techniques of noise reduction, a substation's acoustic field model was established with the SoundPLAN software to predict the scope of substation noise. On this basis, 4 reasonable noise control schemes were advanced to provide some helpful references for noise control during the new substation's design and construction process. And the feasibility and application effect of these control schemes can be verified by using the method of simulation modeling. The simulation results show that the substation always has the problem of excessive noise at boundary under the conventional measures. The excess noise can be efficiently reduced by taking the corresponding noise reduction methods. PMID:24672356

  11. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  12. 48. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. INTERIOR OF CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. INTERIOR OF CONTROL BUILDING, SHOWING TWO ROWS OF STEVENS STAGE RECORDERS AND INFLOW PROGRAMMERS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  13. Compact distribution substation design: Feasibility study: Final report

    SciTech Connect

    Laskowski, L.M.; LaForest, J.

    1987-01-01

    Accelerated escalation in the price of land costs combined with its unavailability in many urban areas has dictated the need to evaluate the techniques and equipment used in the design of distribution substations to improve the efficiency of land use for utility substations. Evaluations have been made of the state-of-the-art power technology, utilities and manufacturers surveys, substation equipment layouts, potential for further reducing equipment sizes, areas for research and development, and costs which may lead to significant contributions in reducing station size. This report presents the results of the evaluations made. It provides basic background information about existing methodologies used by utilities, potential problems and limitations which must be dealt with by utilities during the development of substation equipment layouts for installation at sites with insufficient land space.

  14. 30. Credit PED. View of original substation, located on the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Credit PED. View of original substation, located on the hill above the power house. Transformers destroyed by fire in 1919. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  15. 9. VIEW EASTSOUTHEAST, LEANTO AND SUBSTATION ALONG NORTH ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. VIEW EAST-SOUTHEAST, LEAN-TO AND SUB-STATION ALONG NORTH ELEVATION - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  16. 39. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW OF MISSISSIPPI ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW OF MISSISSIPPI RIVER, LOOKING UPSTREAM FROM THE CONFLUENCE OF THE OHIO AND MISSISSIPPI RIVERS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  17. 20. Zoo Substation. Philadelphia, Philadelphia Co., PA. Sec. 1101, MP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Zoo Substation. Philadelphia, Philadelphia Co., PA. Sec. 1101, MP 87.25. - Northeast Railroad Corridor, Amtrak route between Delaware-Pennsylvania & Pennsylvania-New Jersey state lines, Philadelphia, Philadelphia County, PA

  18. 170. Credit SHS. Northern California Power Company substation, Bully Hill ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    170. Credit SHS. Northern California Power Company substation, Bully Hill Mine area. Note lack of vegetation, caused by nearby copper smelting works. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  19. 46. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF INFLOW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF INFLOW CONTROLLER WITH ORIGINAL CAPACITOR BANK. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  20. 41. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. ATCHAFALAYA FLOODWAY SECTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. ATCHAFALAYA FLOODWAY SECTION, LOOKING WEST FROM OLD RIVER. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  1. 45. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 20 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 20 GALLON PER MINUTE INFLOW CONTROLLER AND DIFFERENTIAL PRESSURE REGULATOR. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  2. 44. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 20 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 20 GALLON PER MINUTE INFLOW CONTROLLER AND RELAY PANEL. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  3. 36. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE MAIN OBSERVATION TOWER OF THE OHIO RIVER AND TRIBUTARIES SECTION, LOOKING UPSTREAM. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  4. 40. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF ATCHAFALAYA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF ATCHAFALAYA FLOODWAY SECTION. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  5. SOUTH AND EAST ELEVATIONS, THE SUBSTATION HOUSED THE ELECTRICAL EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH AND EAST ELEVATIONS, THE SUBSTATION HOUSED THE ELECTRICAL EQUIPMENT USED TO CONVERT AND RECTIFY HIGH VOLTAGE ALTERNATING CURRENT TO A LOWER VOLTAGE DIRECT CURRENT REQUIRED TO OPERATE MINE LOCOMOTIVES AND OTHER MINE EQUIPMENT; NOTE SURFACE HAULAGE TRACK (FOREGROUND) AND FIRE PROOF STONE CONSTRUCTION - Nuttallburg Mine Complex, Substation, North side of New River, 2.7 miles upstream from Fayette Landing, Lookout, Fayette County, WV

  6. Fuzzy logic based ELF magnetic field estimation in substations.

    PubMed

    Kosalay, Ilhan

    2008-01-01

    This paper examines estimation of the extremely low frequency magnetic fields (MF) in the power substation. First, the results of the previous relevant research studies and the MF measurements in a sample power substation are presented. Then, a fuzzy logic model based on the geometric definitions in order to estimate the MF distribution is explained. Visual software, which has a three-dimensional screening unit, based on the fuzzy logic technique, has been developed. PMID:18440967

  7. National SCADA Test Bed Substation Automation Evaluation Report

    SciTech Connect

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  8. Shallow ground-water quality adjacent to burley tobacco fields in northeastern Tennessee and southwestern Virginia, spring 1997

    USGS Publications Warehouse

    Johnson, G.C.; Connell, J.F.

    2001-01-01

    In 1994, the U.S. Geological Survey began an assessment of the upper Tennessee River Basin as part of the National Water-Quality Assessment (NAWQA) Program. A ground-water land-use study conducted in 1996 focused on areas with burley tobacco production in northeastern Tennessee and southwestern Virginia. Land-use studies are designed to focus on specific land uses and to examine natural and human factors that affect the quality of shallow ground water underlying specific types of land use. Thirty wells were drilled in shallow regolith adjacent to and downgradient of tobacco fields in the Valley and Ridge Physiographic Province of the upper Tennessee River Basin. Ground-water samples were collected between June 4 and July 9, 1997, to coincide with the application of the majority of pesticides and fertilizers used in tobacco production. Ground-water samples were analyzed for nutrients, major ions, 79 pesticides, 7 pesticide degradation products, 86 volatile organic compounds, and dissolved organic carbon. Nutrient concentrations were lower than the levels found in similar NAWQA studies across the United States during 1993-95. Five of 30 upper Tennessee River Basin wells (16.7 percent) had nitrate levels exceeding 10 mg/L while 19 percent of agricultural land-use wells nationally and 7.9 percent in the Southeast had nitrate concentrations exceeding 10 mg/L. Median nutrient concentrations were equal to or less than national median concentrations. All pesticide concentrations in the basin were less than established drinking water standards, and pesticides were detected less frequently than average for other NAWQA study units. Atrazine was detected at 8 of 30 (27 percent) of the wells, and deethylatrazine (an atrazine degradation product) was found in 9 (30 percent) of the wells. Metalaxyl was found in 17 percent of the wells, and prometon, flumetralin, dimethomorph, 2,4,5-T, 2,4-D, dichlorprop, and silvex were detected once each (3 percent). Volatile organic compounds

  9. Protein Conformational Populations and Functionally Relevant Sub-states

    SciTech Connect

    Agarwal, Pratul K; Burger, Virginia; Savol, Andrej; Ramanathan, Arvind; Chennubhotla, Chakra

    2013-01-01

    Functioning proteins do not remain fixed in a unique structure, but instead they sample a range of conformations facilitated by motions within the protein. Even in the native state, a protein exists as a collection of interconverting conformations driven by thermodynamic fluctuations. Motions on the fast time scale allow a protein to sample conformations in the nearby area of its conformational landscape, while motions on slower time scales give it access to conformations in distal areas of the landscape. Emerging evidence indicates that protein landscapes contain conformational substates with dynamic and structural features that support the designated function of the protein. Nuclear magnetic resonance (NMR) experiments provide information about conformational ensembles of proteins. X-ray crystallography allows researchers to identify the most populated states along the landscape, and computational simulations give atom-level information about the conformational substates of different proteins. This ability to characterize and obtain quantitative information about the conformational substates and the populations of proteins within them is allowing researchers to better understand the relationship between protein structure and dynamics and the mechanisms of protein function. In this Account, we discuss recent developments and challenges in the characterization of functionally relevant conformational populations and substates of proteins. In some enzymes, the sampling of functionally relevant conformational substates is connected to promoting the overall mechanism of catalysis. For example, the conformational landscape of the enzyme dihydrofolate reductase has multiple substates, which facilitate the binding and the release of the cofactor and substrate and catalyze the hydride transfer. For the enzyme cyclophilin A, computational simulations reveal that the long time scale conformational fluctuations enable the enzyme to access conformational substates that allow

  10. Intelligent devices simplify remote SCADA installations in substations

    SciTech Connect

    Kopriva, V.J.

    1994-12-31

    Utilities are increasingly relying on Supervisory Control and Data Acquisition (SCADA) Systems for the effective and economical management of electric transmission and distribution systems. Now, advances in equipment and design technologies have created opportunities for an increased level of monitoring and control at electric power substations. In the past, prohibitive factors, including complicated equipment and wiring retrofits, protocol compatibility, and hardware installation and maintenance costs have impeded electric utilities in their attempt at broad based application of SCADA systems in electric substations, particularly at distribution voltage levels. These advances in equipment technologies have provided utilities with the opportunity to install and operate SCADA systems at lower cost, while providing flexibility for system expansion over longer periods. The development of intelligent microprocessor controlled devices and integrated communications has facilitated the use of a distributed design approach to installing SCADA monitoring and control in substations. This approach offers greater hardware flexibility and reduced installation costs while increasing reliability, making the addition of monitoring and control to electric substations increasingly practical. This paper will examine current trends in the application of intelligent microprocessor controlled and electronic devices, in stand alone and distributed applications, and the simplification of techniques for installing SCADA systems in substations. It will also consider the potential advantages to be realized in cost and reliability, and examine the necessary changes in design and operation philosophies required to effectively implement the new technology.

  11. Conformational Sub-states and Populations in Enzyme Catalysis.

    PubMed

    Agarwal, P K; Doucet, N; Chennubhotla, C; Ramanathan, A; Narayanan, C

    2016-01-01

    Enzyme function involves substrate and cofactor binding, precise positioning of reactants in the active site, chemical turnover, and release of products. In addition to formation of crucial structural interactions between enzyme and substrate(s), coordinated motions within the enzyme-substrate complex allow reaction to proceed at a much faster rate, compared to the reaction in solution and in the absence of enzyme. An increasing number of enzyme systems show the presence of conserved protein motions that are important for function. A wide variety of motions are naturally sampled (over femtosecond to millisecond time-scales) as the enzyme complex moves along the energetic landscape, driven by temperature and dynamical events from the surrounding environment. Areas of low energy along the landscape form conformational sub-states, which show higher conformational populations than surrounding areas. A small number of these protein conformational sub-states contain functionally important structural and dynamical features, which assist the enzyme mechanism along the catalytic cycle. Identification and characterization of these higher-energy (also called excited) sub-states and the associated populations are challenging, as these sub-states are very short-lived and therefore rarely populated. Specialized techniques based on computer simulations, theoretical modeling, and nuclear magnetic resonance have been developed for quantitative characterization of these sub-states and populations. This chapter discusses these techniques and provides examples of their applications to enzyme systems. PMID:27497171

  12. Credit BG. View looks northeast (56°) across substation foundation toward ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. View looks northeast (56°) across substation foundation toward Building 4318 (Warehouse) and Building 4401 (Hangar No. 1) - Edwards Air Force Base, North Base, Electrical Substation, Second & D Streets, Boron, Kern County, CA

  13. Noise impact caused by electrical energy substations in Curitiba, Brazil

    NASA Astrophysics Data System (ADS)

    Diniz, Fabiano B.; Zannin, Paulo T.

    2003-10-01

    This survey is intended to characterize the noise impact due to electrical energy substations in the city of Curitiba over the population living in their vicinity. This impact has been studied with the aid of a computational tool capable of mapping the acoustical field of substations and their vicinity. Several factors have been considered in this survey: sound power of the transformers; vehicle flow on the surrounding roads; positioning of the firewalls, of the buildings and of the walls; terrain topography. Four substations have been analyzed, and an acoustical map has been traced for each of them. With these maps it was possible to visualize what was the incident noise level on the building facades. The predicted noise levels have been compared to the environmental legislation of the noise emissions in effect in the city.

  14. Induced transients in substation cables: Measurements and models

    SciTech Connect

    Thomas, D.E.; Wiggins, C.M.; Salas, T.M.; Nickel, F.S. ); Wright, S.E. )

    1994-10-01

    An extensive set of switching transient EMI response measurements on several types of substation cables and internal cable wires in described in this paper. Measured and predicted cable/wire current and voltage transients at both air-insulated substations (AIS) and gas-insulated substations (GIS) are presented, for system voltages ranging from 115 kV to 500 kV.. The maximum peak-to-peak amplitudes of measured wire transients are found to vary from around 1 A to almost 20 A (current in amperes), and from 0.3 kV to almost 7 kV (voltage in kilovolts). Predictive models for field-driven coupling, as well as for direct-driven coupling via current transformers or capacitively-coupled voltage transformers (CT's/CCVT's), are presented. Model predictions are compared to and validated against measured wire transients.

  15. Prototypes for gas insulated substation infrared monitoring. Final report

    SciTech Connect

    Crall, R.F.

    1995-01-01

    Gas insulated substations (GIS) are very reliable; but when a short circuit occurs, finding the fault so that equipment can be repaired can take a long time. Infrared (IR) fault location techniques offer some promise to enable faster fault location in the future. It can be very time consuming to locate a short circuit inside a gas insulated bus segment of a gas insulated substation. Special testing may be required, and holes may have to be cut in order to locate the fault so that repair can be initiated. This process is not only expensive but can also lead to damage of unfaulted parts and contamination of the system, which can degrade its reliability. Fast and simple identification of the fault location is highly desirable for reliable operation of the substation. Earlier work had indicated that IR techniques could meet functional requirements and might be cost effective for this application.

  16. Operation of an on-line substation diagnosis system

    SciTech Connect

    Fujimoto, Y.; Ono, T. ); Ibuki, K.; Taka, S. )

    1988-10-01

    On-line monitoring systems for substation equipment are expected to give an impact on the improvement of the reliability of the power system. A monitoring system was applied to one of the newly built substations. It monitors the 204 kV and 72 kV GIS's and the transformer in their normal operation condition. The basic philosophy of the monitoring system and the principle of the detection of the abnormality is introduced together with the record of its operation in the first year.

  17. Criteria for phase-to-phase clearances of HV substations

    SciTech Connect

    Panek, J.; Sublich, M.; Elahi, H. )

    1990-01-01

    To facilitate uprating of HV substations, the paper re-examines line-to-line insulation design criteria. The basis for existing practices and the principles of line-to-line lightning surge overvoltage stresses are reviewed. Results of a digital study for a realistic substation are presented. The conclusions show that the line-to-line stresses, as limited by surge arresters, are substantially higher than line-to-ground stresses. This represents increased requirements as compared to existing standards. However, due to low protective levels of modern arresters, substantial reduction of line-to-line clearances is still feasible.

  18. Federal Programs Supporting Multicounty Substate Regional Activities: An Overview. Rural Development Research Report No. 23.

    ERIC Educational Resources Information Center

    Stam, Jerome M; Reid, J. Norman

    Substate regional organizations (defined as those public bodies that provide planning, economic development, and service coordination for local governments) are discussed, and the major issues pertaining to substate regionalism are explored in this overview. The background and setting of the substate regional movement is traced, from its inception…

  19. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  20. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  1. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  2. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  3. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  4. 43. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 200 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 200 GALLON PER MINUTE INFLOW CONTROLLER WITH NEW PROGRAMMER, LOCATED ALONG THE NATCHEZ SECTION OF THE MODEL. NOTE CONTROL BUILDING AT LEFT. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  5. 42. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 200 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 200 GALLON PER MINUTE INFLOW CONTROLLER WITH NEW PROGRAMMER, LOCATED ALONG THE NATCHEZ SECTION OF THE MODEL. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  6. 47. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW OF STAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW OF STAGE TRANSMITTER AT ALTON, ILLINOIS MODEL SECTION, AND LOCK AND DAM (OLD #26) SIMULATOR. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  7. 23. Historic view, Building 104. View northwest, east side substation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Historic view, Building 104. View northwest, east side substation addition. Photocopy of 1936 photo in Navy/NPS Archives, Charlestown Navy Yard - Charlestown Navy Yard, Shipfitters' Shop, Southeast side of First Avenue between Ninth & Thirteenth Streets, Boston, Suffolk County, MA

  8. 38. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE MAIN OBSERVATION TOWER OF THE MISSISSIPPI RIVER, LOOKING DOWNSTREAM, FROM JUST SOUTH OF THE CONFLUENCE OF THE OHIO AND MISSISSIPPI RIVERS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  9. 7. VIEW OF THE MODERN SUBSTATION (FOREGROUND), WITH THE OLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF THE MODERN SUBSTATION (FOREGROUND), WITH THE OLD SWITCHING BUILDING IN THE BACKGROUND, LOOKING SOUTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  10. 37. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE MAIN OBSERVATION TOWER OF THE MISSISSIPPI RIVER, LOOKING UPSTREAM. THIS VIEW LINES UP WITH LEFT EDGE OF MS-2-36. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  11. GENERAL VIEW OF FLIGHT LINE SUPPORT BUILDINGS (ELECTRICAL SUBSTATION, BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF FLIGHT LINE SUPPORT BUILDINGS (ELECTRICAL SUBSTATION, BUILDING 2775; SURVIVAL EQUIPMENT SHOP (PARACHUTE AND DINGY SHOP), BUILDING 2784; MAINTENANCE DOCK (BUILDING 2785) AND BUILDING 2783 WAR). VIEW TO SOUTHWEST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  12. Electromagnetic transients in substations. Volume 3, Test results: Final report

    SciTech Connect

    Wiggins, C.M.; Nickel, F.S.; Salas, T.M.; Thomas, D.E.

    1993-04-01

    High frequency transient electromagnetic interference (EMI) caused by faults, lightning, and switching on high voltage circuits in substations is characterized and quantified using a mobile four-channel transient EMI measurements system and validated traveling wave transient analysis models. More than 800 waveforms of high voltage switching transients and staged-faults were measured in air- and gas-insulated substations and used to validate a system of interrelated substation interference coupling models. The highest transient EMI levels expected from initial conditions of 2PU (Per Unit) disconnect switching, a 2PU circuit breaker fault, and a 10 kA lightning strike inside substations through 500 kV are calculated using the models. These initial conditions, believed to be nominally worst case for these three high voltage EMI sources, are defined as follows. For disconnect switching, the 2PU initial condition represents the maximum peak phase-to-ground voltage that can occur across a switch gap restriking at its greatest separation. An initial condition of 2PU peak phase-to-ground voltage can occur on an open and adjacent substation bus during switching from a remote location. A 10 kA lightning strike represents the maximum current expected to be attached directly to a 500 kV bus as a result of a shielding failure. Volume 1 of this report contains a summary and recommendations; volume 2 covers the computer models; volume 3 provides detailed results of the interference tests; and volumes 4 and 5, available on demand, contain data logs, raw data plots, and digital waveforms.

  13. Minimize substation outage time by maximizing in-service testing

    SciTech Connect

    Lautenschlager, M. )

    1994-05-01

    Most substation maintenance work is based on fixed schedules rather than on known need. Scheduled maintenance is essential and cannot be eliminated entirely, but priority should be given to equipment known to be deteriorated or defective. It makes no sense to perform costly, scheduled outage maintenance work when other equipment is failing because of undetected defects. The following should be included as major elements in an energized testing program: visual inspections; infrared inspection; corona inspection; percent oxygen in gas samples drawn from nitrogen-blanketed transformers; percent total combustible gas in gas samples drawn from nitrogen-blanketed transformers; dissolved gas analysis; oil quality tests; free water in the sample; dissolved water in oil; dissolved metals-in-oil analysis; furfural concentration analysis; SF[sub 6] analysis; battery testing; the substation grounding grid; and protective relays. 4 figs.

  14. Energy Saving in DC Electric Railways by Battery Substation

    NASA Astrophysics Data System (ADS)

    Sugimoto, Takeshi

    New rolling vehicles used in dc electric railways are of the regenerative type. At less busy time a part of regenerative power is not used for powering vehicles, and canceled by changed air brake. Recently, significant attention has been paid to the development of secondary batteries for hybrid and electric motorcars. The use of this battery enables reduction in electric power consumption. Because we can charge excess regenerative power and use for powering vehicles after. Before the fact we compared the actual and simulated effective coefficient of regenerative energy, we confirmed the suitability of the simulation model. In this simulation, we studied the energy-saving effect of the battery substations and determined the battery capacity at which maximum power saving is achieved. We found that the power consumption could be reduced remarkably by using a 15-20kWh battery substation.

  15. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    SciTech Connect

    Not Available

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  16. Radio interference and transient field from gas-insulated substations

    SciTech Connect

    Harvey, S.M.; Wong, P.S.; Balma, P.M.

    1995-01-01

    Gas-insulated substations (GIS), owing to their compact nature, offer an attractive alternative to conventional substations in areas where space is limited, such as in urban areas. Consequently, it is important to address the issue of environmental conditions within the substation and in the surrounding areas. This paper reports the result of radio interference (RI) and transient field measurements at two GIS in Ontario, Canada. For comparison with RI levels taken at the GIS, RI levels outside two hospitals in the Toronto area were also measured. The transient field study covers electromagnetic interference (EMI) levels generated during switching operations, and includes measurements inside and outside the GIS. Measurements show that RI levels from the GIS were either below background levels, or contributed little to the background. RI levels outside the GIS and the hospitals were similar. Peak transient field values up to 580 V/m were measured inside the station building, and dropped to background values of 10 V/m at about 120 m from the station. The transient field (E) dropped off at a rate of 3/2 power with distance (d) from the air-insulated 115 kV bus, i.e. E {proportional_to} d{sup {minus}1.5}.

  17. Fault Current Distribution and Pole Earth Potential Rise (EPR) Under Substation Fault

    NASA Astrophysics Data System (ADS)

    Nnassereddine, M.; Rizk, J.; Hellany, A.; Nagrial, M.

    2013-09-01

    New high-voltage (HV) substations are fed by transmission lines. The position of these lines necessitates earthing design to ensure safety compliance of the system. Conductive structures such as steel or concrete poles are widely used in HV transmission mains. The earth potential rise (EPR) generated by a fault at the substation could result in an unsafe condition. This article discusses EPR based on substation fault. The pole EPR assessment under substation fault is assessed with and without mutual impedance consideration. Split factor determination with and without the mutual impedance of the line is also discussed. Furthermore, a simplified formula to compute the pole grid current under substation fault is included. Also, it includes the introduction of the n factor which determines the number of poles that required earthing assessments under substation fault. A case study is shown.

  18. 230 kV operation of a substation designed for 115 kV by controlling voltage transients

    SciTech Connect

    Lannes, W.J.; Cheramie, W.J.; Priest, K.W.; Wilhelm, M.R.

    1984-09-01

    Arresters applied at the terminals of gas insulated substations have been used successfully for protection from switching and lightning surges. This arrester application for gas insulated substations permits the use of lower insulation levels and therefore more economical substations. In principle, the same technique can be applied to air insulated substations. This paper describes the analysis of transient voltages in a substation designed for 115 kV which is scheduled for operation at 230 kV. Both arrester rating and location are considered in this analysis. It is shown that complete substation protection is possible by addition of both arresters and capacitors.

  19. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  20. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  1. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  2. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  3. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  4. Development of Protection and Control Unit for Distribution Substation

    NASA Astrophysics Data System (ADS)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  5. Measurements and computations of electromagnetic fields in electric power substations

    SciTech Connect

    Daily, W.K. ); Dawalibi, F. )

    1994-01-01

    The magnetic fields generated by a typical distribution substation were measured and calculated based on a computer model which takes into account currents in the grounding systems, distribution feeder neutrals, overhead ground wires and induced currents in equipment structures and ground grid loops. Both measured and computer results indicate that magnetic fields are significantly influenced by ground currents, as well as induced currents in structures and ground system loops. All currents in the network modeled were computed, based on the measured currents impressed at the boundary points (ends of the conductor network). The agreement between the measured and computer values is good. Small differences were observed and are attributed mainly to uncertainties in the geometry of the network model and phase angles of some of the currents in the neutral conductors which were not measured in the field. Further measurements, including more accurate geometrical information and phase angles, are planned.

  6. On-line monitoring of tan delta for substation equipment

    SciTech Connect

    Vujovic, P.; Fricker, R.K.

    1996-03-01

    The ageing and deterioration of oil-paper insulation in high voltage equipment can result in explosions which are not only costly, but also put human lives at risk. Tan delta measurement is a well accepted method of monitoring the quality of insulation of bushings and current transformers in laboratories and on site. The use of tan delta measurement has been extended to on-line continuous measurement of equipment in service and a comparative method of analysis has been developed for selecting units with values that indicate potentially dangerous levels of degradation of the insulation. A cost effective PC based system that does not require the use of a standard high-voltage capacitor for taking measurements has been installed at two substations for in-service tests and further development.

  7. High Pressure NMR Methods for Characterizing Functional Substates of Proteins.

    PubMed

    Kalbitzer, Hans Robert

    2015-01-01

    Proteins usually exist in multiple conformational states in solution. High pressure NMR spectroscopy is a well-suited method to identify these states. In addition, these states can be characterized by their thermodynamic parameters, the free enthalpies at ambient pressure, the partial molar volumes, and the partial molar compressibility that can be obtained from the analysis of the high pressure NMR data. Two main types of states of proteins exist, functional states and folding states. There is a strong link between these two types, the functional states represent essential folding states (intermediates), other folding states may have no functional meaning (optional folding states). In this chapter, this concept is tested on the Ras protein, an important proto-oncogen in humans where all substates required by theory can be identified experimentally by high pressure NMR spectroscopy. Finally, we show how these data can be used to develop allosteric inhibitors of proteins. PMID:26174382

  8. HEMP-induced transients in electric power substations. Final report

    SciTech Connect

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M.

    1992-02-01

    A nuclear detonation in or above the earth`s atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T & D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  9. HEMP-induced transients in electric power substations

    SciTech Connect

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M. )

    1992-02-01

    A nuclear detonation in or above the earth's atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  10. NSP-North Dakota delays $2 million substation project by using DAS

    SciTech Connect

    Wolfe, D.

    1994-12-31

    This case study will discuss a substation capacity problem recently faced by Northern States Power (NSP) of Grand Forks, ND, and how the problem was resolved. In the Late 1980`s, it became apparent that some sort of substation capacity relief would be required for the electric distribution system of Grand Forks. After studying alternatives, the chosen solution was to implement a distribution automation system allowing for load transfer between substations. In the following, we will discuss: (1) the problem faced by NSP; (2) the implementation of the DA system; (3) advantages and disadvantages of the chosen solution; (4) the results of the system; (5) future expansion plans; and (6) some practical advice.

  11. Implementation of superconducting fault current limiter for flexible operation in the power substation

    NASA Astrophysics Data System (ADS)

    Song, Chong Suk; Lee, Hansang; Cho, Yoon-sung; Suh, Jaewan; Jang, Gilsoo

    2014-09-01

    The concentration of large-scale power loads located in the metropolitan areas have resulted in high fault current levels during a fault thereby requiring the substation to operate in the double busbar configuration mode. However, the double busbar configuration mode results in deterioration of power system reliability and unbalanced power flow in the adjacent transmission lines which may result in issues such as overloading of lines. This paper proposes the implementation of the superconducting fault current limiter (SFCL) to be installed between the two substation busbars for a more efficient and flexible operation of the substation enabling both single and double busbar configurations depending on the system conditions for guaranteeing power system reliability as well as fault current limitations. Case studies are being performed for the effectiveness of the SFCL installation and results are compared for the cases where the substation is operating in single and double busbar mode and with and without the installation of the SFCL for fault current mitigation.

  12. Power frequency electric and magnetic fields from a 230 kV gas-insulated substation

    SciTech Connect

    Wong, P.S.; Rind, T.M. ); Harvey, S.M.; Scheer, R.R. . Research Div.)

    1994-07-01

    Gas-insulated substations (GIS), owing to their compact nature, offer an attractive alternative to conventional substations where space is limited, such as in urban areas. Consequently, it is important to address the issue of environmental conditions in and around the GIS. This paper presents the results of a survey of power-frequency electric and magnetic fields in and around a 230 kV/28 kV GIS. The survey was designed to cover the electric and magnetic fields from the substation equipment and from the power lines and cables surrounding the substation. It also includes a determination of the shielding effect of the GIS bus sheath. The information provided should allow the prediction of electric and magnetic field levels from other GIS of similar design.

  13. Flow and heat distribution analysis of different transformer sub-stations

    NASA Astrophysics Data System (ADS)

    Hasini, H.; Shuaib, N. H.; Yogendran, S. B.; Toh, K. B.

    2013-12-01

    This paper describes CFD investigation on the flow and heat transfer in transformers at different sub-station buildings. The analysis aimed to determine the cooling capability of the existing transformer building employing natural ventilation system to dissipate heat sufficiently when new dry-type transformer operating under full load condition is used. The transformer and building models were developed based on the actual transformer configuration in operation at three different locations in Malaysia. The calculation was carried out on three different types of sub-stations namely stand-alone, attach-to-building and underground. The effect of natural ventilation speed and building volume on the transformer surfaces temperature are also investigated. It was predicted that the existing sub-station configuration is able to dissipate heat produced from the dry type transformer by using its natural ventilation system regardless of the sub-station types. However, the smallest building case shows relatively high surrounding temperature.

  14. Modeling of nonstationary phenomena in the MHD-channel-inverter-substation system

    SciTech Connect

    Gusev, Y.P.; Zatelepin, V.N.; Kuznetsova, T.N.; Medin, S.A.; Pishchikov, V.I.

    1986-07-01

    A method for constructing a mathematical model of nonstationary phenomena in a system consisting of an MHD channel and an inverter substation, operating on a powerful ac grid, is examined. The variants of the realization of the model on a computer are discussed. Results of the solution of model problems with a diagonal MHD channel are presented. It is found that there is a significant coupling between the MHD channel and the inverter substation in transient processes.

  15. Electrical substation service-area estimation using Cellular Automata: An initial report

    SciTech Connect

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  16. [Offshore substation workers' exposure to harmful factors - Actions minimizing risk of hazards].

    PubMed

    Piotrowski, Paweł Janusz; Robak, Sylwester; Polewaczyk, Mateusz Maksymilian; Raczkowski, Robert

    2016-01-01

    The current development of electric power industry in Poland, especially in the field of renewable energy sources, including wind power, brings about the need to introduce legislation on new work environment. The development of occupational safety and health (OSH) regulations that must be met by new workplaces, such as offshore substations becomes necessary in view of the construction of modern offshore wind power plants - offshore wind farms. Staying on offshore substation is associated with an increased exposure to harmful health factors: physical, chemical, biological and psychophysical. The main sources of health risks on offshore substations are: temperature, electromagnetic field, noise from operating wind turbines, direct and alternating current, chemicals, Legionella bacteria and social isolation of people. The aim of this article is to draw attention to the problem of offshore substation workers' exposure to harmful factors and to present methods of preventing and reducing the risk-related adverse health effects. In this paper, there are identified and described risks occurring on offshore substations (fire, explosion, lightning, accidents at work). Some examples of the means and the methods for reducing the negative impact of exposure on the human health are presented and discussed. The article also highlights the need to develop appropriate laws and health and safety regulations concerning the new working environment at the offshore substations. The review of researches and international standards shows that some of them can be introduced into the Polish labor market. PMID:27044719

  17. Multipole mixing ratios and substate populations in Rn-219

    NASA Astrophysics Data System (ADS)

    Jones, G. D.

    2016-08-01

    Historical alpha-gamma angular correlation data for the decay of 223Ra into excited states of 219Rn have been analysed, using the correct spins of the states involved, for the first time. The analyses produced multipole mixing ratios (E2/M1) of δ (144)=-0.11\\+/- 0.03, δ (154)=0, δ (158)=-0.205\\+/- 0.018 and δ (269)=-0.149\\+/- 0.004 where the nominal transition energies, in keV, are given in brackets. These values are consistent with published values obtained from internal conversion electron spectroscopy. It is also found that δ (324)=0 and δ (338)=-0.235\\+/- 0.030 (where both values differ from current tabulations) and that the sign of the multipole mixing ratio for the 122 keV transition is negative. The 158, 269 and 338 keV states are found to be aligned with high population of M=+/- 3/2 substates and the 127 keV state is believed to have undergone spin relaxation.

  18. Deterring Asymmetric Threats from Sub-State Actors

    SciTech Connect

    Homsy, R V

    2002-01-31

    Deterrence means preventing another's actions by influencing their decisionmaking process. Nuclear deterrence was successfully accomplished during the Cold War by holding the adversary's valuable assets at risk by targeting them with nuclear weapons, a policy known as mutually assured destruction (MAD). In this case neither player attacks the other, because the ultimate outcome is self-destruction. Deterrence based upon MAD is largely ineffective against sub-state actors who may have few if any assets, the location of which may be unknown. Furthermore, the threat of destroying their assets may only serve to strengthen their motivation to do more stealthy violence, the threat being interpreted as a taunt. The key to establishing deterrence is understanding the adversary's decision process, starting with the factors upon which decisions are made, called decision attributes. Asymmetric threats are assumed to involve chemical, biological, radiological, or nuclear (CBRN) weapons. So, the key decision attributes here are concerned with the acquisition and use of CBRN weapons. We have identified the following five countermeasure objectives for establishing deterrence: (1) Reduce access to CBRN weapons, expertise, materials, and equipment; (2) Make CBRN weapons difficult to use; (3) Reduce the effectiveness of CBRN weapons; (4) Increase the likelihood of being caught acquiring and using CBRN weapons; and (5) Establish a policy of retribution for acquiring and using CBRN weapons. It should be emphasized that an adversary's perception toward these objectives is most important in affecting their decisionmaking. Of course each adversary will respond differently toward these countermeasures, depending upon their motivations, objectives, preferences, resources, and willingness to gamble. Motivation of violence is defined as the fundamental cause or driving force; absent which the intent to do violence no longer exists. Correct understanding of motivations requires adapting your

  19. Myoglobin-CO Substate Structures and Dynamics: Multidimensional Vibrational Echoes and Molecular Dynamics Simulations

    PubMed Central

    Merchant, Kusai A.; Noid, W. G.; Akiyama, Ryo; Finkelstein, Ilya J.; Goun, Alexei; McClain, Brian L.; Loring, Roger F.; Fayer, M. D.

    2008-01-01

    Spectrally resolved infrared stimulated vibrational echo data were obtained for sperm whale carbonmonoxymyoglobin (MbCO) at 300 K. The measured dephasing dynamics of the CO ligand are in agreement with dephasing dynamics calculated with molecular dynamics (MD) simulations for MbCO with the residue histidine-64 (His64) having its imidazole ε nitrogen protonated (Nε–H). The two conformational substate structures Bε and Rε observed in the MD simulations are assigned to the spectroscopic A1 and A3 conformational substates of MbCO, respectively, based on the agreement between the experimentally measured and calculated dephasing dynamics for these substates. In the A1 substate, the Nε–H proton and Nδ of His64 are approximately equidistant from the CO ligand, while in the A3 substate, the Nε–H of His64 is oriented toward the CO, and the Nδ is on the surface of the protein. The MD simulations show that dynamics of His64 represent the major source of vibrational dephasing of the CO ligand in the A3 state on both femtosecond and picosecond time scales. Dephasing in the A1 state is controlled by His64 on femtosecond time scales, and by the rest of the protein and the water solvent on longer time scales. PMID:14599220

  20. Application of service oriented architecture for sensors and actuators in district heating substations.

    PubMed

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-01-01

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation. PMID:25196165

  1. Application of Service Oriented Architecture for Sensors and Actuators in District Heating Substations

    PubMed Central

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-01-01

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation. PMID:25196165

  2. Conformational Substates of Myoglobin Intermediate Resolved by Picosecond X-ray Solution Scattering

    PubMed Central

    2015-01-01

    Conformational substates of proteins are generally considered to play important roles in regulating protein functions, but an understanding of how they influence the structural dynamics and functions of the proteins has been elusive. Here, we investigate the structural dynamics of sperm whale myoglobin associated with the conformational substates using picosecond X-ray solution scattering. By applying kinetic analysis considering all of the plausible candidate models, we establish a kinetic model for the entire cycle of the protein transition in a wide time range from 100 ps to 10 ms. Four structurally distinct intermediates are formed during the cycle, and most importantly, the transition from the first intermediate to the second one (B → C) occurs biphasically. We attribute the biphasic kinetics to the involvement of two conformational substates of the first intermediate, which are generated by the interplay between the distal histidine and the photodissociated CO. PMID:24761190

  3. Conformational Substates of Myoglobin Intermediate Resolved by Picosecond X-ray Solution Scattering.

    PubMed

    Oang, Key Young; Kim, Jong Goo; Yang, Cheolhee; Kim, Tae Wu; Kim, Youngmin; Kim, Kyung Hwan; Kim, Jeongho; Ihee, Hyotcherl

    2014-03-01

    Conformational substates of proteins are generally considered to play important roles in regulating protein functions, but an understanding of how they influence the structural dynamics and functions of the proteins has been elusive. Here, we investigate the structural dynamics of sperm whale myoglobin associated with the conformational substates using picosecond X-ray solution scattering. By applying kinetic analysis considering all of the plausible candidate models, we establish a kinetic model for the entire cycle of the protein transition in a wide time range from 100 ps to 10 ms. Four structurally distinct intermediates are formed during the cycle, and most importantly, the transition from the first intermediate to the second one (B → C) occurs biphasically. We attribute the biphasic kinetics to the involvement of two conformational substates of the first intermediate, which are generated by the interplay between the distal histidine and the photodissociated CO. PMID:24761190

  4. Analysis of Non-Standard Lightning Impulse Voltage for Actual Substation and Generation Circuit

    NASA Astrophysics Data System (ADS)

    Okabe, Shigemitsu; Koutou, Masanori; Yuasa, Sadayuki; Suzuki, Toshiyuki; Rokunohe, Toshiaki; Yamagiwa, Tokio

    Evaluation of lightning surge waveforms that actually enter into substations is important when investigating the test voltage of electric power equipment. The standard lightning impulse waveform (1.2/50μs) is used for factory tests. However, the actual lightning surge waveforms in actual substations are complex waveforms in which various different oscillations are superimposed. Investigation of insulation characteristics of equipment against the complex waveforms and the standard one has significant importance. We analyzed these waveforms entering actual substations with respect to the insulation characteristics of gas insulated switchigear (GIS). From the results, we defined four types of non-standard lightning impulse waveforms. Then non-standard lightning impulse voltage is generated by an equipment circuit which is consisted of an impulse generator (IG), R, L and C is analyzed with EMTP. Voltage time characteristics were evaluated from the obtained impulse voltages.

  5. Characteristic Analysis of DC Electric Railway Systems with Superconducting Power Cables Connecting Power Substations

    NASA Astrophysics Data System (ADS)

    Ohsaki, H.; Matsushita, N.; Koseki, T.; Tomita, M.

    2014-05-01

    The application of superconducting power cables to DC electric railway systems has been studied. It could leads to an effective use of regenerative brake, improved energy efficiency, effective load sharing among the substations, etc. In this study, an electric circuit model of a DC feeding system is built and numerical simulation is carried out using MATLAB-Simulink software. A modified electric circuit model with an AC power grid connection taken into account is also created to simulate the influence of the grid connection. The analyses have proved that a certain amount of energy can be conserved by introducing superconducting cables, and that electric load distribution and concentration among the substations depend on the substation output voltage distribution.

  6. On-line fault diagnosis of power substation using connectionist expert system

    SciTech Connect

    Yang, H.T.; Chang, W.Y.; Huang, C.L.

    1995-02-01

    This paper proposes a new connectionist (or neural network) expert system for on-line fault diagnosis of a power substation. The Connectionist Expert Diagnosis System has similar profile of an expert system, but can be constructed much more easily from elemental samples. These samples associate the faults with their protective relays and breakers as well as the bus voltages and feeder currents. Through an elaborately designed structure, alarm signals are processed by different connectionist models. The output of the connectionist models is then integrated to provide the final conclusion with a confidence level. The proposed approach has been practically verified by testing on a typical Taiwan Power (Taipower) secondary substation. The test results show that rapid and exactly correct diagnosis is obtained even for the fault conditions involving multiple faults or failure operation of protective relay and circuit breaker. Moreover, the system can be transplanted into various substations with little additional implementation effort.

  7. Surge arresters for 1200-kV gas-insulated substation. Final report

    SciTech Connect

    Connell, T.R.; Kalb, J.W.

    1983-10-01

    With the exception of dynamic overvoltage performance at 1.4 pu, the electrical requirements were met. The design offers a 20% improvement in protective levels and is 60% smaller than conventional designs for gas-insulated substations. It is uniquely to the coaxial geometry of gas-insulated substations. It requires no special manufacturing or assembly techniques. The design is suitable for dc use. A current limiting gap design of essentially the same geometry would apparently meet the requirements but would be less durable, likely not less costly and is probably no longer commercially acceptable.

  8. Application of neural networks in identification of various types of partial discharges in gas insulated substations

    NASA Astrophysics Data System (ADS)

    Kishore, K. K.; Adikesavulu, A. K.; Singh, B. P.; Eswaran, Kumar

    2000-03-01

    Gas Insulated substations (GIS) up to 500kV class have been widely accepted over conventional air insulated substation due to several advantages. However, the presence of floating metal particles and protrusions within the GIS at various locations could seriously affect the performance. The paper describes the method of detection of partial discharges for various type of discharging sources e.g. floating particles, protrusions of high voltage conductor and particles sticking on the surface of insulator. In order to identify the discharge source, a Neural Network program is developed to classify each of the above source on the basis of its characteristic pattern.

  9. Consumers power delays new substation construction by controlling electric cart: Battery chargers

    SciTech Connect

    Bombery, M.F.; Duncan, T.R.

    1995-12-31

    During July of 1993, Consumers Power Company, Grand Rapids, Michigan, USA, was surprised by a series of electric system component failures due to overload. The outages resulted in widespread customer dissatisfaction within a 865 acre resort called Sandy Pines. Several conventional solutions were quickly implemented, but projections of continued load growth led to scheduling the construction of a new distribution substation. Current efforts are focusing on load control of electric golf cart battery chargers to shift the peak demand causing the overload and delay or cancel the planned new substation.

  10. 68. SUBSTATION 15, 606 WEST 143RD STREET. DIRECT CURRENT FEEDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    68. SUBSTATION 15, 606 WEST 143RD STREET. DIRECT CURRENT FEEDER OIL-CIRCUIT BREAKERS ON GALLERY, EACH ENCLOSED IN INDIVIDUAL BRICK COMPARTMENT. COMPARTMENTS FACED HAND-OPERATED SWITCHES WHICH CONTROLLED ITS BREAKER. - Interborough Rapid Transit Subway (Original Line), New York County, NY

  11. Field Test of Fiber-Optic Voltage and Current Sensors Applied to Gas Insulated Substation

    NASA Astrophysics Data System (ADS)

    Kuroda, Y.; Abe, Y.; Kuwahara, H.; Yoshinaga, K.

    1986-08-01

    The fiber-optic voltage and current sensors applied for 84kV three phase type gas insulated substation (GIS) were tested in order to see the advantages of these sensors practically in adverse field condition. The application technologies and field endurance test results of the sensors are described in this paper.

  12. Design modification and layout of utility substations for six phase transmission

    SciTech Connect

    Rebbapragada, R.V.; Brown, M.T. ); Dorazio, T.F. ); Stewart, J.R. )

    1993-01-01

    This paper describes the evaluations performed on the New York State Electric and Gas Corporation's (NYSEG) 115 kV Goudey-Oakdale line and Goudey and Oakdale substations to assess the capability of the existing equipment to operate as part of a six phase demonstration project. This paper also describes the design modifications that will be made to meet the goals of the commercial demonstration and to allow integration into the existing three phase operating grid. Reconfiguration of an existing double circuit line to a single circuit six phase line requires installation of phase reconfiguration transformers at the end of the line terminals and the associated switching, metering and protection equipment. In addition, the phase conductors from the terminals of the transformers have to be transposed for connection to the transmission line to achieve the desired 60[degree] vectorial separation angle between adjacent phase conductors. This requires innovative approaches to achieve phase reconfiguration that are economical, technically adequate and constructible and that provide design insights for future six phase lines. Concepts of substation compaction have been pursued when attempting substation modifications for six phase reconfiguration. This is demonstrated by the use of 132 kV metal oxide surge arresters on the 161 kV side of the transformer, the application of live tank gas insulated circuit breakers, the utilization of existing structures within the substation to the extent possible, and the use of railroad ties for transformer support and a membrane based oil containment pit.

  13. Gas-insulated substation reliability: present status and future trends. Final report

    SciTech Connect

    Boggs, S.A.; Chu, F.Y.; Mashikian, M.S.

    1986-02-01

    Gas-insulated substations (GIS) in the United States have not lived up to their original promise of high reliability. This comparison of US and overseas experience indicates that most US problems came from introducing the technology on high-voltage systems. As US experience with these systems grows, GIS reliability will increase.

  14. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public Participation § 256.60 Requirements for public participation in State and substate..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public...

  15. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public Participation § 256.60 Requirements for public participation in State and substate..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public...

  16. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public Participation § 256.60 Requirements for public participation in State and substate..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public...

  17. NORTH EMBANKMENT IN FOREGROUND, WITH (LR) SUBSTATION (MI98D), POWERHOUSE (MI98C), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH EMBANKMENT IN FOREGROUND, WITH (L-R) SUBSTATION (MI-98-D), POWERHOUSE (MI-98-C), AND COOKE DAM POND IN BACKGROUND. VIEW TO SOUTH - Cooke Hydroelectric Plant, North Embankment, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  18. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  19. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  20. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  1. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  2. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  3. Analysis on heat loss characteristics of a 10 kV HTS power substation

    NASA Astrophysics Data System (ADS)

    Teng, Yuping; Dai, Shaotao; Song, Naihao; Zhang, Jingye; Gao, Zhiyuan; Zhu, Zhiqin; Zhou, Weiwei; Wei, Zhourong; Lin, Liangzhen; Xiao, Liye

    2014-09-01

    A 10 kV High Temperature Superconducting power substation (10 kV HTS substation), supported by Chinese State 863 projects, was developed and has been running to supply power for several factories for more than two years at an industrial park of Baiyin, Gansu province in Northwest China. The system of the 10 kV HTS substation compositions, including a HTS cable, a HTS transformer, a SFCL, and a SMES, are introduced. The SMES works at liquid helium temperature and the other three apparatus operates under liquid nitrogen condition. There are mainly four types of heat losses existing in each HTS apparatus of the 10 kV HTS substation, including AC loss, Joule heat loss, conductive heat, and leak-in heat from cryostat. A small quantity of AC loss still exists due to the harmonic component of the current when it carries DC for HTS apparatus. The principle and basis for analysis of the heat losses are introduced and the total heat loss of each apparatus are calculated or estimated, which agree well with the test result. The analysis and result presented are of importance for the design of the refrigeration system.

  4. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  5. 123. ARAI Substation (ARA726) plan, elevation, security fence details, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. ARA-I Substation (ARA-726) plan, elevation, security fence details, and sections. Norman Engineering Company 961-area/SF-726-E-1. Date: January 1959. Ineel index code no. 068-0726-10-613-102778. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  6. Electromagnetic transients in substations. Volume 2, Models, validations, and simulations: Final report

    SciTech Connect

    Wiggins, C.M.; Nickel, F.S.; Salas, T.M.; Thomas, D.E.

    1993-04-01

    High frequency transient electromagnetic interference (EMI) caused by faults. lightning, and switching on high voltage circuits in substations is characterized and quantified using a mobile four-channel transient EMI measurements system and validated traveling wave transient analysis models. More than 800 waveforms of high voltage switching transients and staged-faults were measured in air- and gas-insulated substations and used to validate a system of interrelated substation interference coupling models. The highest transient EMI levels expected from initial conditions of 2PU (Per Unit) disconnect switching, a 2PU circuit breaker fault. and a 10 kA lightning strike inside substations through 500 kV are calculated using the models. These initial conditions, believed to be nominally worst case for these three high voltage EMI sources, are defined as follows. For disconnect switching, the 2PU initial condition represents the maximum peak phase-to-ground voltage that can occur across a switch gap restriking at its greatest separation. An initial condition of 2PU peak phase-to-ground voltage can occur on an open and adjacent substation bus during switching from a remote location. A 10 kA lightning strike represents the maximum current expected to be attached directly to a 500 kV bus as a result of a shielding failure. Volume 1 of this report contains a summary and recommendations; volume 2 covers the computer models; volume 3 provides detailed results of the interference tests; and volumes 4 and 5, available on demand, contain data logs, raw data plots, and digital waveforms.

  7. Electromagnetic transients in substations. Volume 1, Project summary and recommendations: Final report

    SciTech Connect

    Wiggins, C.M.; Nickel, F.S.; Salas, T.M.; Thomas, D.E.

    1993-04-01

    High frequency transient electromagnetic interference (EMI) caused by faults, lightning, and switching on high voltage circuits in substations is characterized and quantified using a mobile four-channel transient EMI measurements system and validated traveling wave transient analysis models. More than 800 waveforms of high voltage switching transients and staged-faults were measured in air and gas-insulated substations and used to validate a system of interrelated substation interference coupling models. The highest transient EMI levels expected from initial conditions of 2PU (Per Unit) disconnect switching, a 2PU circuit breaker fault, and a 10 kA lightning strike inside substations through 500 kV are calculated using the models. These initial conditions, believed to be nominally worst case for these three high voltage EMI sources, are defined as follows. For disconnect switching, the 2PU initial condition represents the maximum peak phase-to-ground voltage that can occur across a switch gap restriking at its greatest separation. An initial condition of 2PU peak phase-to-ground voltage can occur on an open and adjacent substation bus during switching from a remote location. A 10 kA lightning strike represents the maximum current expected to be attached directly to a 500 kV bus as a result of a shielding failure. Volume 1 of this report contains a summary and recommendations; volume 2 covers the computer models; volume 3 provides detailed results of the interference tests; and volumes 4 and 5, available on demand, contain, data logs, raw data plots, and digital waveforms.

  8. Automatic extraction of insulators from 3D LiDAR data of an electrical substation

    NASA Astrophysics Data System (ADS)

    Arastounia, M.; Lichti, D. D.

    2013-10-01

    A considerable percentage of power outages are caused by animals that come into contact with conductive elements of electrical substations. These can be prevented by insulating conductive electrical objects, for which a 3D as-built plan of the substation is crucial. This research aims to create such a 3D as-built plan using terrestrial LiDAR data while in this paper the aim is to extract insulators, which are key objects in electrical substations. This paper proposes a segmentation method based on a new approach of finding the principle direction of points' distribution. This is done by forming and analysing the distribution matrix whose elements are the range of points in 9 different directions in 3D space. Comparison of the computational performance of our method with PCA (principal component analysis) shows that our approach is 25% faster since it utilizes zero-order moments while PCA computes the first- and second-order moments, which is more time-consuming. A knowledge-based approach has been developed to automatically recognize points on insulators. The method utilizes known insulator properties such as diameter and the number and the spacing of their rings. The results achieved indicate that 24 out of 27 insulators could be recognized while the 3 un-recognized ones were highly occluded. Check point analysis was performed by manually cropping all points on insulators. The results of check point analysis show that the accuracy, precision and recall of insulator recognition are 98%, 86% and 81%, respectively. It is concluded that automatic object extraction from electrical substations using only LiDAR data is not only possible but also promising. Moreover, our developed approach to determine the directional distribution of points is computationally more efficient for segmentation of objects in electrical substations compared to PCA. Finally our knowledge-based method is promising to recognize points on electrical objects as it was successfully applied for

  9. Eight percent cost penalty for world's first 765-kV SF/sub 6/ substation may be bargain

    SciTech Connect

    Laskowski, L.M.

    1981-08-01

    A Lynchburg, Virginia 765 kV sulfur hexafluoride substation cost a premium of 8% over conventional substations in order to meet environmental requirements, but the first 18 months of operation required no maintenance costs and a design flexibility that meant less land and no landscaping was required. Some of the added front-end cost should be assigned to research and development for this prototype installation. A review of the siting and design specifications cites a number of environmental as well as economic advantages of low-profile, gas-insulated substations. 7 figures, 1 table. (DCK)

  10. An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

    NASA Technical Reports Server (NTRS)

    Kalu, Alex

    1990-01-01

    The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

  11. Lightning overvoltage protection of the paddock 362-145 kV Gas-Insulated Substation

    SciTech Connect

    Elahi, H.; Sublich, M. ); Anderson, M.E.; Nelson, B.D. )

    1990-01-01

    Backflashovers close to the Paddiock 362-145 kV Gas-Insulated Substation (GIS) have been analyzed with the Electro-Magnetic Transient Program (EMTP) using a frequency dependent multi-conductor system. The severity of the lightning stroke currents were derived based on recent recordings in the eastern United States. Impacts of corona attenuation and distortion were accounted for using a shunt linear model approach. Turn-up effects of both line insulator flashover voltages and surge arrester protective characteristics were represented based on manufacturer's volt-time curves. Wave shaping effects of substation capacitances (ie., PT's transformers, CCPD's) were also modeled. Results show the importance of various modeling details in determining the overvoltages inside the GIS due to close backflashovers, which are caused by lightning strokes with varying intensity. These results are aimed at better evaluation of lightning protection requirements for GIS protected by metal-oxide surge arresters.

  12. Status of research and development for 1200-kV transmission and substation equipment

    SciTech Connect

    Walldorf, S.P.; Gnadt, P.A.

    1985-01-01

    In 1975 the US Department of Energy (DOE), Division of Electric Energy Systems (EES), initiated a program for the research and development (R and D) of 1200-kV transmission and substation equipment with a goal of developing the technology capable of three-phase power transfer of 10 GW. This R and D program has encompassed all the major and essential transmission cable, substation apparatus, and specialized instrumentation for a 1200-kV system; and it has produced a number of full-scale 1200-kV components that have successfully undergone or are still undergoing accelerated field testing. This paper presents a review of the overall DOE/EES 1200-kV R and D program, describes the major components developed, highlights their key design aspects, indicates the present status of development and testing, and presents a discussion of future commercial implications.

  13. A substation infrared temperature monitoring and warning system with object separation and image registration

    NASA Astrophysics Data System (ADS)

    Lin, Lihua; Wu, Dongmei; Liu, Jian; Zhang, Xinghua

    2010-08-01

    To find the defects of the apparatus in a substation in the early stage, an infrared temperature monitoring and warning system is established. This system can monitor the electrical equipment automatically the movement condition. The systemic circulation gathers the transformer substation electrical equipment the infrared imagery, the extraction goal equipment temperature information, and with the history database creation connection, the synthesis distinguishes the equipment failure information. In view of image gathering when because the mechanical drive creates the deviation, proposed one kind of object-oriented division and the image matching adjustment algorithm, first carries on the object division and the configuration definition to the image, then uses based on the phase correlation carries on the matching with the Harris vertex match image matching method to the deviation image. In this paper, a infrared remote-viewing image registration based on phase correlation and feature points matching is presented. Several experiments illustrate that this method has a good performance of reliability and accuracy.

  14. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ...: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: BPA intends to... reinforcements of five existing BPA substations, placement of new conductor on sections of an existing...

  15. Title XX and CETA. A Coordination Guide for Title XX Administrators.

    ERIC Educational Resources Information Center

    Urban Management Consultants of San Francisco, Inc., CA.

    Written for the social service (Title XX) administrator at the State or sub-State level, this guide is intended to serve four major purposes: (1) Provide selected insights into what the Comprehensive Employment and Training Act (CETA) is and how it works; (2) point out potential areas for coordination which, from study or field experience, hold…

  16. The varistor protected series capacitors at the 500 KV broadview substation

    SciTech Connect

    Barcus, J.M. ); Miske, S.A. Jr. ); Vitols, A.P. ); Maynard, H.M. ); Peterson, W.G. )

    1988-10-01

    Two 235 Mvar series capacitors have been successfully applied at the 500 kV Broadview substation of the Colstrip Transmission Project. The series capacitors have an overvoltage protection system based on metal oxide varistors. The system provides instantaneous bypass and reinsertion of the capacitors following external line section faults. The excellent performance of the equipment was demonstrated during staged fault tests performed in October, 1985. The banks have been in successful operation since January, 1986.

  17. Analysis of the 60-Hz power system at KSC: The Orsino substation

    NASA Technical Reports Server (NTRS)

    Kalu, Alex O.

    1989-01-01

    An analysis of the Orsino Substation, a component (50 percent) of the 60-Hertz electric power system at the Kennedy Space Center, is presented. Presented here are separate single-line diagrams of the sixteen feeder circuits to permit easy access to information on the individual feeders for future planning. The load condition of each feeder and load break switch are presented and a heuristic reliability analysis of the system is performed. Information is given about the system fashion useful for decision making purposes. The beauty of it is in the simplified manner by which information about the system can be obtained.

  18. New fault locating system for air-insulated substations using optical current detector

    SciTech Connect

    Yoshida, Y.; Kawazoe, S. ); Ibuki, K.; Yamada, K.; Ochi, N. . Itami Works)

    1992-10-01

    This paper deals with a newly developed fault locating system. This fault locating system helps to shorten the time required for restoration of service after the occurrence of a busbar fault in an air-insulated distribution substation. Recent optical and electronic technologies allow highly accurate and compact fault locating system, which consists of optical current detectors using Faraday effect and a fault locating processor employing digital data processing technique. The fault location is made by discriminating the direction of zero-sequence currents. Through various tests and field operations it has been confirmed that the system has sufficient performance for practical application.

  19. Protection of SF/sub 6/ gas insulated substations - Industry survey results

    SciTech Connect

    Akamine, J.K.; Baumgartner, E.A.; Emery, J.T.; Haas, R.W.; Murray, T.J.

    1987-10-01

    This paper summarizes the result of an industry survey of gas insulated equipment practices and develops recommendations where necessary. Tables are included to show the type of gas insulated equipment located at each substation (current transformers, voltage transformers, switches, bus bars, bushings, lightning arresters, and cable end terminations), the equipment configuration (single or three conductors), the type of gas monitoring equipment used (density or pressure), the use of gas monitoring equipment (alarm and/or trip), unique relaying protection applications, and unique operating procedures. Gas insulated circuit breakers are specifically excluded from this survey.

  20. Analysis of a 1200 kV circuit breaker for a gas insulated substation. Final report

    SciTech Connect

    Not Available

    1985-01-01

    This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.

  1. Acoustic diagnosis of gas insulated substations; A theoretical and experimental basis

    SciTech Connect

    Lundgaard, L.E.; Runde, M. ); Skyberg, B. )

    1990-10-01

    Loose particles and discharges inside the ducts of a gas insulated substation (GIS) are considered hazardous to the insulation system. These irregularities or flaws can be detected by using acoustic sensors placed on the enclosure. An elementary review of sound propagation in the GIS, together with corresponding experimental results are presented. By using ultrasonic acoustic emission sensors an excellent sensitivity to discharges and moving particles is obtained. The method offers possibilities for a quantification of the flaws, and thereby for a risk analysis. However, the degree of certainty of such an analysis is still low, especially for particles.

  2. Elm Creek: NSP establishes new 345 kV substation in Twin Cities area

    SciTech Connect

    Ray, B.; Spaulding, P.; Olson, D.

    1996-11-01

    Northern States Power Company (NSP) has proposed to expand the existing Elm Creek substation located in the City of Maple Grove for 345 kV development. The planned expansion will not require acquisition of any new 345 kV transmission line right-of-way. The northwestern metropolitan area of Twin Cities (Minneapolis/St. Paul) has been experiencing significant growth in the residential, commercial and industrial sectors. This necessitates substantial transmission and distribution system improvements in the near future involving millions of dollars of capital investment, to ensure adequate load serving capability and maintain the desired reliability. Relaxing thermal transmission limitations in this area will be achieved by strategic establishment of a new 345 kV source at the existing Elm Creek site in year 2000. The central location of the station in relation to the area experiencing rapid load development makes it an excellent choice for the desired 345 kV source establishment. One 115 kV circuit from Elm Creek to Champlin substation is being constructed in 1997 which will act as an additional transmission outlet from the 345 kV source. Recently completed Long-Range Geographic Planning Study results strongly reinforce the need for such prudent improvements.

  3. Intercomparison of magnetic field measurements near MV/LV transformer substations: methodological planning and results.

    PubMed

    Violanti, S; Fraschetta, M; Adda, S; Caputo, E

    2009-12-01

    Within the framework of Environmental Agencies system's activities, coordinated by ISPRA (superior institute for environmental protection and research), a comparison among measurements was designed and accomplished, in order to go into depth on the matter of measurement problems and to evaluate magnetic field at power frequencies. These measurements have been taken near medium voltage /low voltage transformer substation. This project was developed with the contribution of several experts who belong to different Regional Agencies. In three of these regions, substations having specific international standard characteristics were chosen; then a measurement and data analysis protocol was arranged. Data analysis showed a good level of coherence among results obtained by different laboratories. However, a range of problems emerged, either during the protocol predisposition and definition of the data analysis procedure or during the execution of measures and data reprocessing, because of the spatial and temporal variability of magnetic field. These problems represent elements of particular interest in determining a correct measurement methodology, whose purpose is the comparison with limits of exposure, attention values and quality targets. PMID:19843547

  4. ADM. Aerial view of administration area. Camera facing westerly. From ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ADM. Aerial view of administration area. Camera facing westerly. From left to right in foregound: Substation (TAN-605), Warehouse (TAN-628), Gate House (TAN-601), Administration Building (TAN-602). Left to right middle ground: Service Building (TAN-603), Warehouse (later known as Maintenance Shop or Craft Shop, TAN-604), Water Well Pump Houses, Fuel Tanks and Fuel Pump Houses, and Water Storage Tanks. Change House (TAN-606) on near side of berm. Large building beyond berm is A&M. Building, TAN-607. Railroad tracks beyond lead from (unseen) turntable to the IET. Date: June 6, 1955. INEEL negative no. 13201 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  5. The ground grid design of the Barra Do Peixe substation using a two-layer soil model

    SciTech Connect

    Villas, J.E.T. ); Casagrande, J.A.A. ); Mukhedkar, D. ); De Costa, V.S. )

    1988-10-01

    A computer program originally developed for electric field calculations has been successfully used for the ground grid design of a substation (Barra do Peixe) to be built in the north-west part of Brazil. An additional computer program for soil modeling which determines the best two-layer fit from multi-layered earth is presented.

  6. Final environmental assessment for vegetation control at VHF stations, microwave stations, electrical substations, and pole yards

    SciTech Connect

    1995-10-13

    Southwestern Power Adm. operates very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards for electric power transmission throughout AR, MO, and OK. Vegetation growth at the stations must be suppressed for safety of operation and personnel. Southwestern has been using a combination of mechanical/manual and herbicide control for this purpose; Federally- mandated reductions in staff and budgetary resources require Southwestern to evaluate all potentially efficient methods for vegetation control. Three alternatives were examined: no action, mechanical/manual control, and (proposed) a combination of mechanical/manual and herbicide control. Environmental impacts on air and water quality, wetlands, wildlife, endangered species, archaeological and other resources, farmland, human health, transportation, etc. were evaluated.

  7. Performance of gas-insulated substations and associated grounding networks during fault and transient conditions

    SciTech Connect

    Lee, H.; Dawalibi, F.P.; Ruan, W.; Fortin, S.

    1996-11-01

    This paper discusses in detail the electric modeling of the overhead tubular enclosures of a 500 kV circuit breaker in a gas insulated substation. Under both steady-state and phase-to-ground fault conditions, the current distribution on the enclosure as well as the spatial distribution of the scalar potentials and electromagnetic fields near the circuit breaker are computed at different frequencies for various wire-mesh models of the breaker enclosure. The selected frequencies are representative of those present in the frequency spectrum of typical lightning transient currents. The different models of the breaker enclosure are obtained by varying the number of conductors used to represent the enclosure. For a given enclosure diameter and length, the minimum number of conductors required to obtain satisfactory current distribution and electromagnetic field results at different frequencies are determined.

  8. A solid state gas density monitor for gas insulated substation equipment

    SciTech Connect

    Saaski, E.W.; Hartl, J.C.

    1982-07-01

    A solid state gas density monitor has been developed for SF/sub 6/ service in gas-insulated substation equipment that is based on principles and construction techniques similar to ionization-type fire alarms. The monitor has a resolution of .7kPa (.1 psi) at 20/sup 0/C and, depending on ion chamber voltage and geometry, exhibits a linearity of /sup +//sub -/1 to /sup +//sub -/4. kPa (/sup +//sub -/.15 to /sup +//sub -/.6 psi) at 20/sup 0/C over the density range 0.20 to 0.66 MPa (30 to 95 psia) at 20/sup 0/C. The monitor incorporates two level contact closure actuated by gas density falling below one of two pre-set alarm limits, and an LCD read-out for visual monitoring and instrument calibration. The display presents density in terms of equivalent psia at 68/sup 0/F. (20/sup 0/C.).

  9. Techniques for the protection of gas-insulated substation to cable interfaces

    SciTech Connect

    Fujimoto, N.; Croall, S.J.; Foty, S.M. )

    1988-10-01

    Line-to-ground faults in gas-insulated substations (GIS) generate fast nanosecond risetime transients which cause sparkovers across the insulated flange of high pressure oil filled cable/GIS interfaces. The ionized path formed by the sparkovers creates a low-impedance path for power frequency fault current, resulting in flange damage with potentially serious consequences. Various techniques for protecting the insulating flange from such damage are investigated and discussed, both in terms of new designs and in terms of retrofits for existing installations. In order to be effective, each protection scheme must adequately deal with the fast transients generated by breakdown in the GIS. As the frequencies of these transients are 1 to 2 orders of magnitude higher than for ''conventional'' power system transients, special considerations are necessary in the protection scheme chosen.

  10. Dynamic Simulation on the Installation Process of HGIS in Transformer Substation

    NASA Astrophysics Data System (ADS)

    Lin, Tao; Li, Shaohua; Wang, Hu; Che, Deyong; Qi, Guangcai; Yao, Jianfeng; Zhang, Qingzhe

    The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.

  11. Elucidation of a Peculiar Phenomenon of Voltage Measuring at a Substation

    NASA Astrophysics Data System (ADS)

    Takafuji, Kouya; Satou, Takashi; Itou, Hisanori; Kouda, Isao; Haba, Toshiaki; Satake, Atushi; Haginomori, Eiichi

    An automatic fault-recorder installed in a substation of Chubu Electric Power Company detected a peculiar phenomenon that bus-bar voltage fell to around 20-30% of the nominal value for a short time (about 8-10 cycles) though electric current didn't change during the period. The phenominon was recorded several times. In this paper, we analyzed the origin of this phenomenon and conducted simulations by EMTP. As a result, we estimated that this phenomenon occurred by the saturation of VT (voltage transformer), and this saturation caused by lightning strokes to the transmission line with line arresters, which have been increasingly installed in recent years. Moreover, we evaluated the influence of the phenomenon to protection relays.

  12. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    SciTech Connect

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P.; Eyre, L.E.; Dell, L.D.; Kelly, D.S.

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes.

  13. The insulation coordination and surge arrester design for HTS cable system in Icheon substation

    NASA Astrophysics Data System (ADS)

    Lee, Hansang; Yoon, Dong-Hee; Lee, Seung-Ryul; Yang, Byeong-Mo; Jang, Gilsoo

    2013-01-01

    This paper proposes an insulation coordination and surge arrester design for HTS (High-Temperature Superconducting) cable system in Icheon substation in Korea. In the aspect of the economic analysis, since the HTS cable is very expensive, the insulation coordination to prevent the dielectric breakdown caused by the lightning surge should be considered carefully. Also, in the aspect of the power system reliability, since the HTS cable has much more capacity compared than conventional power cables and the ripple effect from the HTS cable failure may lead to the wide area blackout, an intensive study for insulation coordination from lightning surge is one of the most important considerations. In this paper, the insulation coordination for lightning surge is verified using HTS cable and power equipment models and the design of the proper surge arrester is proposed.

  14. Seismic base isolation of gas insulated electrical substations: Comparison among different solutions

    SciTech Connect

    Serino, G.; Bettinali, F.; Bonacina, G.

    1995-12-31

    Base isolation of an outdoor 170 kV Gas-Insulated Substation conforming to ENEL standardization is proposed. The analyzed GIS has two separated phases and its layout consists of a compact block composed of five bays and two High-to-Medium Voltage power transformers. The design has been carried out following the International Electrotechnical Commission (IEC) requirements for seismic qualification of HV equipment. Three solutions are presented, each making use of different isolation devices: High-Damping Steel-Laminated Rubber Bearings, helical springs and visco-dampers, Friction Pendulu devices. The procedures adopted in the design of the three isolation systems are briefly explained, pointing out advantages and drawbacks of each solution.

  15. Ion conduction in substates of the batrachotoxin-modified Na+ channel from toad skeletal muscle.

    PubMed Central

    Naranjo, D; Latorre, R

    1993-01-01

    Batrachotoxin-modified Na+ channels from toad muscle were inserted into planar lipid bilayers composed of neutral phospholipids. Single-channel conductances were measured for [Na+] ranging between 0.4 mM and 3 M. When membrane preparations were made in the absence of protease inhibitors, two open conductance states were identified: a fully open state (16.6 pS in 200 mM symmetrical NaCl) and a substate that was 71% of the full conductance. The substate was predominant at [Na+] > 65 mM, whereas the presence of the fully open state was predominant at [Na+] < 15 mM. Addition of protease inhibitors during membrane preparation stabilized the fully open state over the full range of [Na+] studied. In symmetrical Na+ solutions and in biionic conditions, the ratio of amplitudes remained constant and the two open states exhibited the same permeability ratios of PLi/PNa and PCs/PNa. The current-voltage relations for both states showed inward rectification only at [Na+] < 10 mM, suggesting the presence of asymmetric negative charge densities at both channel entrances, with higher charge density in the external side. An energy barrier profile that includes double ion occupancy and asymmetric charge densities at the channel entrances was required to fit the conductance-[Na+] relations and to account for the rectification seen at low [Na+]. Energy barrier profiles differing only in the energy peaks can give account of the differences between both conductance states. Estimation of the surface charge density at the channel entrances is very dependent on the ion occupancy used and the range of [Na+] tested. Independent evidence for the existence of a charged external vestibule was obtained at low external [Na+] by identical reduction of the outward current induced by micromolar additions of Mg2+ and Ba2+. PMID:8388264

  16. Hazard zoning around electric substations of petrochemical industries by stimulation of extremely low-frequency magnetic fields.

    PubMed

    Hosseini, Monireh; Monazzam, Mohammad Reza; Farhang Matin, Laleh; Khosroabadi, Hossein

    2015-05-01

    Electromagnetic fields in recent years have been discussed as one of the occupational hazards at workplaces. Hence, control and assessment of these physical factors is very important to protect and promote the health of employees. The present study was conducted to determine hazard zones based on assessment of extremely low-frequency magnetic fields at electric substations of a petrochemical complex in southern Iran, using the single-axis HI-3604 device. In measurement of electromagnetic fields by the single-axis HI-3604 device, the sensor screen should be oriented in a way to be perpendicular to the field lines. Therefore, in places where power lines are located in different directions, it is required to keep the device towards three axes of x, y, and z. For further precision, the measurements should be repeated along each of the three axes. In this research, magnetic field was measured, for the first time, in three axes of x, y, and z whose resultant value was considered as the value of magnetic field. Measurements were done based on IEEE std 644-1994. Further, the spatial changes of the magnetic field surrounding electric substations were stimulated using MATLAB software. The obtained results indicated that the maximum magnetic flux density was 49.90 μT recorded from boiler substation, while the minimum magnetic flux density of 0.02 μT was measured at the control room of the complex. As the stimulation results suggest, the spaces around incoming panels, transformers, and cables were recognized as hazardous zones of indoor electric substations. Considering the health effects of chronic exposure to magnetic fields, it would be possible to minimize exposure to these contaminants at workplaces by identification of risky zones and observation of protective considerations. PMID:25877640

  17. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    SciTech Connect

    Maguire, James; McNamara, Joseph

    2010-06-25

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and

  18. Development of 1200-kV compressed-gas-insulated transmission and substation equipment in the United States

    SciTech Connect

    Walldorf, S.P.; Gnadt, P.A.

    1986-01-01

    Major research and development (R and D) programs for the development of sulfur hexafluoride (SF/sub 6/) compressed-gas-insulated (CGI) equipment for ultrahighvoltage (uhv) application at 100-1200 kV have been under way independently in both the United States and Japan. The CGI transmission and substation equipment under study and development in these countries has included the surge arrester, circuit breaker, CGI transmission bus, disconnect and ground switches, and an air-SF/sub 6/ termination. The US CGI program has also included development of a power transformer, shunt reactor, voltage- and current-sensing instrumentation, and a line trap, all for 1200-kV application. This paper presents the overall status of development of CGI substation equipment for uhv application in the United States. It describes the major CGI components developed, highlights their key design aspects, indicates the present status of development and testing, and addresses the work remaining to establish final design consepts. The paper also includes 23 references, a number of which have not been widely distributed or included in any of the recently published bibliographies of uhv substation equipment.

  19. Assessment of the risk of failure of high voltage substations due to environmental conditions and pollution on insulators.

    PubMed

    Castillo Sierra, Rafael; Oviedo-Trespalacios, Oscar; Candelo, John E; Soto, Jose D

    2015-07-01

    Pollution on electrical insulators is one of the greatest causes of failure of substations subjected to high levels of salinity and environmental pollution. Considering leakage current as the main indicator of pollution on insulators, this paper focuses on establishing the effect of the environmental conditions on the risk of failure due to pollution on insulators and determining the significant change in the magnitude of the pollution on the insulators during dry and humid periods. Hierarchical segmentation analysis was used to establish the effect of environmental conditions on the risk of failure due to pollution on insulators. The Kruskal-Wallis test was utilized to determine the significant changes in the magnitude of the pollution due to climate periods. An important result was the discovery that leakage current was more common on insulators during dry periods than humid ones. There was also a higher risk of failure due to pollution during dry periods. During the humid period, various temperatures and wind directions produced a small change in the risk of failure. As a technical result, operators of electrical substations can now identify the cause of an increase in risk of failure due to pollution in the area. The research provides a contribution towards the behaviour of the leakage current under conditions similar to those of the Colombian Caribbean coast and how they affect the risk of failure of the substation due to pollution. PMID:25634366

  20. A Fuzzy-Based Control Method for Smoothing Power Fluctuations in Substations along High-Speed Railways

    NASA Astrophysics Data System (ADS)

    Sugio, Tetsuya; Yamamoto, Masayoshi; Funabiki, Shigeyuki

    The use of an SMES (Superconducting Magnetic Energy Storage) for smoothing power fluctuations in a railway substation has been discussed. This paper proposes a smoothing control method based on fuzzy reasoning for reducing the SMES capacity at substations along high-speed railways. The proposed smoothing control method comprises three countermeasures for reduction of the SMES capacity. The first countermeasure involves modification of rule 1 for smoothing out the fluctuating electric power to its average value. The other countermeasures involve the modification of the central value of the stored energy control in the SMES and revision of the membership function in rule 2 for reduction of the SMES capacity. The SMES capacity in the proposed smoothing control method is reduced by 49.5% when compared to that in the nonrevised control method. It is confirmed by computer simulations that the proposed control method is suitable for smoothing out power fluctuations in substations along high-speed railways and for reducing the SMES capacity.

  1. Simulation and study of power quality issues in a fixed speed wind farm substation.

    PubMed

    Magesh, T; Chellamuthu, C

    2015-01-01

    Power quality issues associated with the fixed speed wind farm substation located at Coimbatore district are investigated as the wind generators are tripping frequently. The investigations are carried out using two power quality analyzers, Fluke 435 and Dranetz PX5.8, with one of them connected at group control breaker of the 110 kV feeder and the other at the selected 0.69 kV generator busbar during the period of maximum power generation. From the analysis of the recorded data it is found that sag, swell, and transients are the major events which are responsible for the tripping of the generators. In the present study, simulation models for wind, turbine, shaft, pitch mechanism, induction generator, and grid are developed using DIgSILENT. Using the turbine characteristics, a two-dimensional lookup table is designed to generate a reference pitch angle necessary to simulate the power curve of the passive stall controlled wind turbine. Various scenarios and their effects on the performance of the wind farm are studied and validated with the recorded data and waveforms. The simulation model will be useful for the designers for planning and development of the wind farm before implementation. PMID:25950016

  2. Simulation and Study of Power Quality Issues in a Fixed Speed Wind Farm Substation

    PubMed Central

    Magesh, T.; Chellamuthu, C.

    2015-01-01

    Power quality issues associated with the fixed speed wind farm substation located at Coimbatore district are investigated as the wind generators are tripping frequently. The investigations are carried out using two power quality analyzers, Fluke 435 and Dranetz PX5.8, with one of them connected at group control breaker of the 110 kV feeder and the other at the selected 0.69 kV generator busbar during the period of maximum power generation. From the analysis of the recorded data it is found that sag, swell, and transients are the major events which are responsible for the tripping of the generators. In the present study, simulation models for wind, turbine, shaft, pitch mechanism, induction generator, and grid are developed using DIgSILENT. Using the turbine characteristics, a two-dimensional lookup table is designed to generate a reference pitch angle necessary to simulate the power curve of the passive stall controlled wind turbine. Various scenarios and their effects on the performance of the wind farm are studied and validated with the recorded data and waveforms. The simulation model will be useful for the designers for planning and development of the wind farm before implementation. PMID:25950016

  3. Temperature Measurements on Hot Spots of Power Substations Utilizing Surface Acoustic Wave Sensors

    NASA Astrophysics Data System (ADS)

    Cavaco, M. A. M.; Benedet, M. E.; Neto, L. R.

    2011-12-01

    In several applications in the field of metrology, the direct connection of the sensor element with the respective signal-processing unit of the measurement system is not trivial. It can be mentioned, as an example, the measurement of hot points in electric power substations because of the high electrical potential. To solve that problem, two alternatives were studied, one using active surface acoustic wave (SAW) sensors and other using passive SAW tags. For the passive sensor, a SAW radio-frequency identification (RFID) temperature detector was used. That technology is widely applied for typical transport identification (grain transportation, road traffic control), but its application in the field of metrology is innovative. The variation in temperature makes an alteration in the characteristics of the piezoelectric material of the SAW matrix, changing mostly the resonance frequency. Using SAW-RFID, the problem of measuring temperature basically is directed to the identification of the frequency of resonance of the SAW. The use of active SAW sensors has been demonstrated to be much more satisfactory for the solution of such a problem because of the limitation in the range of the passive sensors.

  4. Boston Edison and LG&E win 7th annual substation design contest

    SciTech Connect

    Beaty, W.

    1996-07-01

    Boston`s Edison`s Network Station 53 won First Place in the engineering/operations category of Electric Light & Power`s 7th annual substation design contest. Station 53 also took Second Place in the aesthetic design category. Boston Edison is no stranger to the contest, having won top honors in the aesthetic category in the very first contest in 1990. That same year, Boston took Second Place in engineering/operations design and Third Place in aesthetic design. Station 53 occupies a 12,074-square-foot site in the heart of the Boston financial district. It replaces an existing station where the land was required for Boston`s Central Artery project. Great care was taken to ensure that Station 53 would blend into the cityscape and be pleasing to the eye. The architectural treatment was designed by the Boston Anderson-Nichols & Company Inc., in cooperation with the Boston Redevelopment Authority. The latest in engineering technology was utilized to guarantee reliability, maintain the highest service quality and provide capacity for future load growth in the downtown area. Station 53 is supplied by two underground 115-kV pipe-type transmission cables. Unattended and remotely operated, Station 53 has the capability of sectionalizing the 115-kV power supply by remote control to isolate the faulted sections.

  5. Conformational substates in a protein: structure and dynamics of metmyoglobin at 80 K.

    PubMed

    Hartmann, H; Parak, F; Steigemann, W; Petsko, G A; Ponzi, D R; Frauenfelder, H

    1982-08-01

    The crystal structure of sperm whale metmyoglobin has been determined at 80 K to a resolution of 2A. The overall structure at 80 K is similar to that at 300 K except that the volume is smaller. Refinement of the structure by the method of restrained least squares (current R = 0.175) permits the assignment of isotropic atomic mean-square displacements to all nonhydrogen atoms. Comparison with the values obtained earlier at 250-300 K indicates that the protein at 80 K is more rigid. The average experimentally determined Debye-Waller factor, B, for the protein is 14A2 at 300 K and 5A2 at 80 K. Plots of backbone mean-square displacement vs. temperature show a discontinuity of slope for at least one-third of all residues. This behavior is in good agreement with the temperature dependence of the mean-square displacement of the heme iron as measured by Mössbauer absorption. The magnitudes of the smallest mean-square displacements observed at 80 K indicate that intramolecular motions can be frozen out to a surprisingly large degree. Even at 80 K, however, some atoms in myoglobin still have mean-square displacements greater than 0.1A2, thus providing evidence for conformational substates. PMID:6956905

  6. Administrative Synergy

    ERIC Educational Resources Information Center

    Hewitt, Kimberly Kappler; Weckstein, Daniel K.

    2012-01-01

    One of the biggest obstacles to overcome in creating and sustaining an administrative professional learning community (PLC) is time. Administrators are constantly deluged by the tyranny of the urgent. It is a Herculean task to carve out time for PLCs, but it is imperative to do so. In this article, the authors describe how an administrative PLC…

  7. Solution NMR of a 463-Residue Phosphohexomutase: Domain 4 Mobility, Substates, and Phosphoryl Transfer Defect

    SciTech Connect

    Sarma, Akella V. S.; Anbanandam, Asokan; Kelm, Allek; Mehra-Chaudhary, Ritcha; Wei, Yirui; Qin, Peiwu; Lee, Yingying; Berjanskii, Mark V.; Mick, Jacob A.; Beamer, Lesa J.; Van Doren, Steven R.

    2012-01-05

    Phosphomannomutase/phosphoglucomutase contributes to the infectivity of Pseudomonas aeruginosa, retains and reorients its intermediate by 180°, and rotates domain 4 to close the deep catalytic cleft. Nuclear magnetic resonance (NMR) spectra of the backbone of wild-type and S108C-inactivated enzymes were assigned to at least 90%. 13C secondary chemical shifts report excellent agreement of solution and crystallographic structure over the 14 α-helices, C-capping motifs, and 20 of the 22 β-strands. Major and minor NMR peaks implicate substates affecting 28% of assigned residues. These can be attributed to the phosphorylation state and possibly to conformational interconversions. The S108C substitution of the phosphoryl donor and acceptor slowed transformation of the glucose 1-phosphate substrate by impairing kcat. Addition of the glucose 1,6-bisphosphate intermediate accelerated this reaction by 2–3 orders of magnitude, somewhat bypassing the defect and apparently relieving substrate inhibition. The S108C mutation perturbs the NMR spectra and electron density map around the catalytic cleft while preserving the secondary structure in solution. Diminished peak heights and faster 15N relaxation suggest line broadening and millisecond fluctuations within four loops that can contact phosphosugars. 15N NMR relaxation and peak heights suggest that domain 4 reorients slightly faster in solution than domains 1–3, and with a different principal axis of diffusion. Finally, this adds to the crystallographic evidence of domain 4 rotations in the enzyme, which were previously suggested to couple to reorientation of the intermediate, substrate binding, and product release.

  8. Conformational substates in enzyme mechanism: the 120 K structure of alpha-lytic protease at 1.5 A resolution.

    PubMed Central

    Rader, S. D.; Agard, D. A.

    1997-01-01

    Insight into the dynamic properties of alpha-lytic protease (alpha LP) has been obtained through the use of low-temperature X-ray crystallography and multiple-conformation refinement. Previous studies of alpha LP have shown that the residues around the active site are able to move significantly to accommodate substrates of different sizes. Here we show a link between the ability to accommodate ligands and the dynamics of the binding pocket. Although the structure of alpha LP at 120 K has B-factors with a uniformly low value of 4.8 A2 for the main chain, four regions stand out as having significantly higher B-factors. Because thermal motion should be suppressed at cryogenic temperatures, the high B-factors are interpreted as the result of trapped conformational substates. The active site residues that are perturbed during accommodation of different substrates are precisely those showing conformational substates, implying that substrate binding selects a subset of conformations from the ensemble of accessible states. To better characterize the precise nature of these substates, a protein model consisting of 16 structures has been refined and evaluated. The model reveals a number of features that could not be well-described by conventional B-factors: for example, 40% of the main-chain residue conformations are distributed asymmetrically or in discrete clusters. Furthermore, these data demonstrate an unexpected correlation between motions on either side of the binding pocket that we suggest is a consequence of "dynamic close packing." These results provide strong evidence for the role of protein dynamics in substrate binding and are consistent with the results of dynamic studies of ligand binding in myoglobin and ribonuclease A. PMID:9232638

  9. Modernizing Administration.

    ERIC Educational Resources Information Center

    Lombardi, Vincent L.; Hildebrand, Verna

    1981-01-01

    Suggests assignment of research duties and rotation of teaching and management roles for college administrators, to increase their effectiveness and diminish the negative effects of declining enrollments. (JD)

  10. The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation

    SciTech Connect

    Gusev, S. I.; Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I.

    2009-09-15

    The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

  11. Administrative Support.

    ERIC Educational Resources Information Center

    Doran, Dorothy; And Others

    This guide is intended to assist business education teachers in administrative support courses. The materials presented are based on the Arizona validated occupational competencies and tasks for the occupations of receptionist, secretary, and administrative assistant. Word processing skills have been infused into each of the three sections. The…

  12. Administrative Ecology

    ERIC Educational Resources Information Center

    McGarity, Augustus C., III; Maulding, Wanda

    2007-01-01

    This article discusses how all four facets of administrative ecology help dispel the claims about the "impossibility" of the superintendency. These are personal ecology, professional ecology, organizational ecology, and community ecology. Using today's superintendency as an administrative platform, current literature describes a preponderance of…

  13. A residue substitution near the beta-ionone ring of the retinal affects the M substates of bacteriorhodopsin

    NASA Technical Reports Server (NTRS)

    Varo, G.; Zimanyi, L.; Chang, M.; Ni, B.; Needleman, R.; Lanyi, J. K.

    1992-01-01

    The switch in the bacteriorhodopsin photocycle, which reorients access of the retinal Schiff base from the extracellular to the cytoplasmic side, was suggested to be an M1----M2 reaction (Varo and Lanyi. 1991. Biochemistry. 30:5008-5015, 5016-5022). Thus, in this light-driven proton pump it is the interconversion of proposed M substates that gives direction to the transport. We find that in monomeric, although not purple membrane-lattice immobilized, D115N bacteriorhodopsin, the absorption maximum of M changes during the photocycle: in the time domain between its rise and decay it shifts 15 nm to the blue relative to the spectrum at earlier times. This large shift strongly supports the existence of two M substates. Since D115 is located near the beta-ionone ring of the retinal, the result raises questions about the possible involvement of the retinal chain or protein residues as far away as 10 A from the Schiff base in the mechanism of the switching reaction.

  14. Southwestern Power Administration annual site environmental report CY 1997

    SciTech Connect

    1998-11-01

    This report provides a synopsis of Southwestern Power Administration`s (Southwestern`s) effectiveness in managing its operations in an environmentally responsible manner. In CY 1997, the Office of Environmental, Safety, and Health was reorganized and incorporated into the Division of Acquisition and Property. The Division of Acquisition, Property, and Environmental Management maintains responsibility for development, oversight, and implementation of environmental programs. Senior Management at Southwestern has taken actions to increase environmental awareness throughout the organization. During CY 1997, (Southwestern) was not involved in any known programs or activities that had adverse impacts on the environment. The 1997 Environmental Appraisal, a portion of Southwestern`s Self-Assessment and Appraisal Program, indicated approximately 90% compliance with Southwestern`s written environmental programs. Southwestern continued to function throughout CY 1997 in an operations and maintenance posture with minor substation projects.

  15. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  16. Modeling of a 22.9 kV 50 MVA superconducting power cable based on PSCAD/EMTDC for application to the Icheon substation in Korea

    NASA Astrophysics Data System (ADS)

    Lee, S.; Yoon, J.; Lee, B.; Yang, B.

    2011-11-01

    Two projects for high temperature superconducting (HTS) power cable have been carried out in Korea since 2001. One of them is a HTS cable project in DAPAS (Development of Advanced Power system by Applied Superconductivity technologies) program funded by the Ministry of Education, Science and Technology. In this project, LS Cable Ltd. (LSC) and Korea Electrotechnology Research Institute (KERI) jointly developed a 22.9 kV, 50 MVA, 3 phase, 100 m HTS cable using first generation (1G) HTS wire in 2006. The HTS cable system has been tested in a power test center of Korea Electric Power Corporation (KEPCO). LSC and KEPCO have been developing a 22.9 kV, 50 MVA, 3 phase, 500 m HTS cable system using second generation (2G) HTS wire since 2008, based on the technology of the DAPAS project. This project is called as GENI (Green Superconducting Electric Power Network at the Icheon Substation) project. The target of GENI project is to install and operate the HTS cable system in the Icheon substation located in near Seoul. In order to analyze the Icheon substation power system employing the HTS cable, an analysis model of the HTS cable is necessary. This paper describes the development of an analysis model for the 22.9 kV, 50 MVA HTS cable that will be applied to the Icheon substation in Korea.

  17. Administrative IT

    ERIC Educational Resources Information Center

    Grayson, Katherine, Ed.

    2006-01-01

    When it comes to Administrative IT solutions and processes, best practices range across the spectrum. Enterprise resource planning (ERP), student information systems (SIS), and tech support are prominent and continuing areas of focus. But widespread change can also be accomplished via the implementation of campuswide document imaging and sharing,…

  18. Engineering Administration.

    ERIC Educational Resources Information Center

    Naval Personnel Program Support Activity, Washington, DC.

    This book is intended to acquaint naval engineering officers with their duties in the engineering department. Standard shipboard organizations are analyzed in connection with personnel assignments, division operations, and watch systems. Detailed descriptions are included for the administration of directives, ship's bills, damage control, training…

  19. ADMINISTRATIVE CLIMATE.

    ERIC Educational Resources Information Center

    BRUCE, ROBERT L.; CARTER, G.L., JR.

    IN THE COOPERATIVE EXTENSION SERVICE, STYLES OF LEADERSHIP PROFOUNDLY AFFECT THE QUALITY OF THE SERVICE RENDERED. ACCORDINGLY, MAJOR INFLUENCES ON ADMINISTRATIVE CLIMATE AND EMPLOYEE PRODUCTIVITY ARE EXAMINED IN ESSAYS ON (1) SOURCES OF JOB SATISFACTION AND DISSATISFACTION, (2) MOTIVATIONAL THEORIES BASED ON JOB-RELATED SATISFACTIONS AND NEEDS,…

  20. Database Administrator

    ERIC Educational Resources Information Center

    Moore, Pam

    2010-01-01

    The Internet and electronic commerce (e-commerce) generate lots of data. Data must be stored, organized, and managed. Database administrators, or DBAs, work with database software to find ways to do this. They identify user needs, set up computer databases, and test systems. They ensure that systems perform as they should and add people to the…

  1. Southwestern Power Administration Annual Report 2010

    SciTech Connect

    2012-09-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  2. Southwestern Power Administration Annual Report 2012

    SciTech Connect

    2013-09-01

    Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  3. Southwestern Power Administration Annual Report 2011

    SciTech Connect

    2013-04-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  4. Algorithm of transferring the load of the faulted substation transformer using the best-first search method

    SciTech Connect

    Kim, H.; Ko, Y.S.; Jung, K.H. )

    1992-07-01

    In this paper, an expert system is developed to provide a quick and best strategy of load transfer for the power system operator. This load transferring problem is then constrained by the firm and normal capacities of a bank, the fault history of a bank, and the feeder priorities. Heuristic rules which are obtained from a substation operator and both DDC (Distribution Dispatch Center) and DDC (Distribution Control Center) engineers, are incorporated in an expert system to improve the solution procedure. Furthermore, the structural rules based on the bus topology are also generated to reduce the number of switching required to reallocate the load from the busbar connected to the faulted bank to the other sections. This expert system is implemented in Prolog, and the best-first search method is adopted. To solve the combinatorial problem, list processing and recursive programming techniques are used. We also employ the pattern matching mechanism to trace the feeder connectivity.

  5. A New Approach to Detection of Systematic Errors in Secondary Substation Monitoring Equipment Based on Short Term Load Forecasting

    PubMed Central

    Moriano, Javier; Rodríguez, Francisco Javier; Martín, Pedro; Jiménez, Jose Antonio; Vuksanovic, Branislav

    2016-01-01

    In recent years, Secondary Substations (SSs) are being provided with equipment that allows their full management. This is particularly useful not only for monitoring and planning purposes but also for detecting erroneous measurements, which could negatively affect the performance of the SS. On the other hand, load forecasting is extremely important since they help electricity companies to make crucial decisions regarding purchasing and generating electric power, load switching, and infrastructure development. In this regard, Short Term Load Forecasting (STLF) allows the electric power load to be predicted over an interval ranging from one hour to one week. However, important issues concerning error detection by employing STLF has not been specifically addressed until now. This paper proposes a novel STLF-based approach to the detection of gain and offset errors introduced by the measurement equipment. The implemented system has been tested against real power load data provided by electricity suppliers. Different gain and offset error levels are successfully detected. PMID:26771613

  6. A New Approach to Detection of Systematic Errors in Secondary Substation Monitoring Equipment Based on Short Term Load Forecasting.

    PubMed

    Moriano, Javier; Rodríguez, Francisco Javier; Martín, Pedro; Jiménez, Jose Antonio; Vuksanovic, Branislav

    2016-01-01

    In recent years, Secondary Substations (SSs) are being provided with equipment that allows their full management. This is particularly useful not only for monitoring and planning purposes but also for detecting erroneous measurements, which could negatively affect the performance of the SS. On the other hand, load forecasting is extremely important since they help electricity companies to make crucial decisions regarding purchasing and generating electric power, load switching, and infrastructure development. In this regard, Short Term Load Forecasting (STLF) allows the electric power load to be predicted over an interval ranging from one hour to one week. However, important issues concerning error detection by employing STLF has not been specifically addressed until now. This paper proposes a novel STLF-based approach to the detection of gain and offset errors introduced by the measurement equipment. The implemented system has been tested against real power load data provided by electricity suppliers. Different gain and offset error levels are successfully detected. PMID:26771613

  7. The value of distributed generation: The PVUSA grid-support project serving Kerman Substation. Interim report, April 1994

    SciTech Connect

    Hoff, T.; Wenger, H.

    1994-07-01

    A common practice of electric utilities experiencing transmission and distribution (T and D) system overloads is to expand the substation, add lines, or upgrade equipment, all of which are capital intensive options. In 1988, it was hypothesized that strategically sited photovoltaics (PV) could benefit parts of T and D systems near or at overloaded conditions. An evaluation methodology was developed and applied to a test case (Kerman Substation near Fresno, California). Analytical results suggested that the value of PV to the T and D system could substantially exceed its energy and generation capacity value. The importance of this finding indicated the need for empirical validation. This led to the construction of a 0.5 MW PV demonstration plant by Pacific Gas and Electric Company (PG and E) at Kerman, California as part of the PVUSA (PV for Utility Scale Applications) project. PVUSA is a national public-private partnership that is assessing and demonstrating the viability of utility-scale photovoltaic electric generation systems. The Kerman PV plant, commissioned for commercial operation in June, 1993, is reported to be the first grid-support PV demonstration plant in the world. This Interim Report focuses on validating the technical aspects of grid-support PV. It provides interim validation results for four of the eight identified value components that stack up to make the ``value bar``, and compares them to 1992 Case Study estimates. Results are based on improved technical evaluation methodologies, measured plant performance under a variety of conditions, and long-term plant performance estimated using a validated computer simulation program. This report is not intended to be exhaustive in scope. It does, however, provide a thorough progress update of the validation project. Complete documentation of test procedures, data, and evaluation methods will be presented in the Final Report.

  8. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation

    SciTech Connect

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

  9. Review and evaluation of the Department of Energy's Research and Development Program for 1200-kV transmission and substation equipment

    SciTech Connect

    Gnadt, P.A.; Walldorf, S.P.

    1985-06-01

    In 1975 the US Department of Energy (DOE), Division of Electric Energy Systems (EES), initiated a program for the research and development (R and D) of 1200-kV transmission and substation equipment with a goal of developing the technology capable of three-phase power transfer of 10 GW. The program was oriented toward compact, compressed-gas-insulated (CGI) component design. The DOE/EES R and D program has encompassed all the major and essential transmission cable, substation apparatus, and specialized instrumentation for a 1200-kV system. It has included more than ten major multiyear research projects and has involved numerous research, development, manufacturing, and testing organizations. This report provides a review and evaluation of the overall DOE/EES 1200-kV R and D program. It includes detailed descriptions of the major projects, their objectives, component and system design direction, and current research status. Future R and D requirements are noted, and commercialization issues are briefly discussed. Research to date has not presented any insurmountable technical obstacles to 1200-kV CGI component design. Thus, although all of the component pieces are not yet available and all of the testing is not yet complete, 1200-kV CGI-based transmission and substation equipment appears to be technically feasible. Although the substation and transmission components under development in this program will not likely reach 1200-kV system commercialization for a number of years, many of the materials and design concepts that have been identified for 1200-kV service are readily applicable to devices rated at lower voltages.

  10. Development of electronic potential and current transducers suitable for gas insulated switchgear and adequate for application to substation digital control systems

    SciTech Connect

    Tokoro, K.; Harumoto, Y.; Ida, Y.; Mukae, H.; Ohno, Y.; Shimada, M.; Yamamoto, H.; Yoshida, Y.

    1982-10-01

    Substation Digital Control System (SDCS) had been developed for the future system controlling the large scale power system. For application of SDCS to Gas Insulated Switchgear (GIS), electronic potential and current transducers fit for GIS have been developed. This equipment is composed of a capacitive dividing type potential transducer, a low burden current transformer, an analogue-to-digital conversion unit and an optical fiber signal transmit system. Good performance is confirmed by the application tests simulating the field circumstances.

  11. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  12. Bonneville Power Administration 1991 site environmental report

    SciTech Connect

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  13. Induced Surge Characteristics on a Control Cable in a Gas-Insulated Substation due to Switching Operation

    NASA Astrophysics Data System (ADS)

    Ametani, Akihiro; Goto, Takahiro; Nagaoka, Naoto; Omura, Hiroshi

    This paper has investigated the basic characteristics of switching surges in a gas-insulated substation and induced surges to a control cable based on EMTP simulations. It has been found that a switching surge voltage on the core conductor of a gas-insulated bus (GIB) tends to increase and the oscillating frequency becomes lower as the number of spacers increases. The maximum switching overvoltages become greater at the nodes nearby an operating disconnector (DS)/circuit breaker (CB) and become smaller at the source side. An induced surge to a control cable tends to increase as the parallel length of the GIB and the control cable increases. However, in the case of an open-circuited GIB, there exists a length which gives the highest voltage. A transient current becomes very large if a voltage transformer (VT) or a spacer is installed right next to an operating CB or DS, although this current does not affect the induced and VT transferred surge to the control cable. Also it is observed that a ramp wave voltage causes polarity reversing of a transient voltage on the GIB tank and the control cable.

  14. Analysis of the substate distribution of H(n=3) atoms from electron capture by protons on Ar

    SciTech Connect

    Renwick, S.P.; Martell, E.C.; Weaver, W.D.; Risley, J.S.

    1993-05-01

    We present a measurement of diagonal and real off-diagonal germs of the density matrix describing H(n=3) atoms produced by electron capture of 20 - 100 keV protons colliding with Ar. These elements of the excited atoms` density matrix are used to determine important parameters of the collisionally-produced H atom, including the atom`s electric dipole moment and cross sections for electron capture to angular momentum substates of n=3. The matrix is determined by analysis of the polarization of Balmer-{alpha} light emitted by the radiative decay of the atoms in an external electric field. A new polarimeter, employing a photoelastic modulator, has allowed us to subtract undesired background from excited Ar atoms. The dipole moment and the probablity density of the excited H atoms produced from the Ar target show similar qualitative behavior to those from a He target at higher beam energies, while their behavior is markedly different below 35 keV. Data will be presented along with a comparison of the PEM to other polarimeters.

  15. Segmentation of planar surfaces in LiDAR point clouds of an electrical substation by exploring the structure of points neighbourhood

    NASA Astrophysics Data System (ADS)

    Arastounia, M.; Lichti, D. D.

    2014-06-01

    According to the Department of Energy of the USA, today's electrical distribution system is 97.97% reliable. However, power outages and interruptions still impact many people. Many power outages are caused by animals coming into contact with the conductive elements of the electrical substations. This can be prevented by covering the conductive electrical objects with insulating materials. The design of these custom-built insulating covers requires a 3D as-built plan of the substation. This research aims to develop automated methods to create such a 3D as-built plan using terrestrial LiDAR data for which objects first need to be recognized in the LiDAR point clouds. This paper reports on the application of a new algorithm for the segmentation of planar surfaces found at electrical substations. The proposed approach is a region growing method that aggregates points based on their proximity to each other and their neighbourhood dispersion direction. PCA (principal components analysis) is also employed to segment planar surfaces in the electrical substation. In this research two different laser scanners, Leica HDS 6100 and Faro Focus3D, were utilized to scan an electrical substation in Airdrie, a city located in north of Calgary, Canada. In this research, three subsets incorporating one subset of Leica dataset with approximately 1.7 million points and two subsets of the Faro dataset with 587 and 79 thousand points were utilized. The performance of our proposed method is compared with the performance of PCA by performing check point analysis and investigation of computational speed. Both methods managed to detect a great proportion of planar points (about 70%). However, the proposed method slightly outperformed PCA. 95% of the points that were segmented by both methods as planar points did actually lie on a planar surface. This exhibits the high ability of both methods to identify planar points. The results also indicate that the computational speed of our method is

  16. Southwestern Power Administration Annual Report 2008

    SciTech Connect

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  17. Event Detection and Sub-state Discovery from Bio-molecular Simulations Using Higher-Order Statistics: Application To Enzyme Adenylate Kinase

    PubMed Central

    Ramanathan, Arvind; Savol, Andrej J.; Agarwal, Pratul K.; Chennubhotla, Chakra S.

    2012-01-01

    Biomolecular simulations at milli-second and longer timescales can provide vital insights into functional mechanisms. Since post-simulation analyses of such large trajectory data-sets can be a limiting factor in obtaining biological insights, there is an emerging need to identify key dynamical events and relating these events to the biological function online, that is, as simulations are progressing. Recently, we have introduced a novel computational technique, quasi-anharmonic analysis (QAA) (PLoS One 6(1): e15827), for partitioning the conformational landscape into a hierarchy of functionally relevant sub-states. The unique capabilities of QAA are enabled by exploiting anharmonicity in the form of fourth-order statistics for characterizing atomic fluctuations. In this paper, we extend QAA for analyzing long time-scale simulations online. In particular, we present HOST4MD - a higher-order statistical toolbox for molecular dynamics simulations, which (1) identifies key dynamical events as simulations are in progress, (2) explores potential sub-states and (3) identifies conformational transitions that enable the protein to access those sub-states. We demonstrate HOST4MD on micro-second time-scale simulations of the enzyme adenylate kinase in its apo state. HOST4MD identifies several conformational events in these simulations, revealing how the intrinsic coupling between the three sub-domains (LID, CORE and NMP) changes during the simulations. Further, it also identifies an inherent asymmetry in the opening/closing of the two binding sites. We anticipate HOST4MD will provide a powerful and extensible framework for detecting biophysically relevant conformational coordinates from long time-scale simulations. PMID:22733562

  18. Senior Administrators Should Have Administrative Contracts.

    ERIC Educational Resources Information Center

    Posner, Gary J.

    1987-01-01

    Recognizing that termination is viewed by the employee as the equivalent to capital punishment of a career, an administrative contract can reduce the emotional and financial entanglements that often result. Administrative contracts are described. (MLW)

  19. Novice Administrators: Personality and Administrative Style Changes.

    ERIC Educational Resources Information Center

    Schmidt, Linda J.; Kosmoski, Georgia J.; Pollack, Dennis R.

    Since the advent of effective-schools research findings, educational administration experts have advocated a democratic and collegial leadership style for school administrators. This paper provides the findings of a study that examined 43 beginning administrators (25 females, 32 Caucasians, 9 African-Americans, 2 Hispanics) to determine what…

  20. Organization/Administration.

    ERIC Educational Resources Information Center

    Chaffee, Ellen Earle

    Patterns that emerged from reviewing 26 syllabi for courses on organization and administration in higher education are discussed, and six sample syllabi are presented. The syllabi focused more on organization than administration. Of the 26 syllabi, 19 dealt with organization and administration generally; 5 with administration in a specific…

  1. Two-dimensional vibrational spectroscopy of the amide I band of crystalline acetanilide: Fermi resonance, conformational substates, or vibrational self-trapping?

    NASA Astrophysics Data System (ADS)

    Edler, J.; Hamm, P.

    2003-08-01

    Two-dimensional infrared (2D-IR) spectroscopy is applied to investigate acetanilide, a molecular crystal consisting of quasi-one-dimensional hydrogen bonded peptide units. The amide-I band exhibits a double peak structure, which has been attributed to different mechanisms including vibrational self-trapping, a Fermi resonance, or the existence of two conformational substates. The 2D-IR spectrum of crystalline acetanilide is compared with that of two different molecular systems: (i) benzoylchloride, which exhibits a strong symmetric Fermi resonance and (ii) N-methylacetamide dissolved in methanol which occurs in two spectroscopically distinguishable conformations. Both 2D-IR spectra differ significantly from that of crystalline acetanilide, proving that these two alternative mechanisms cannot account for the anomalous spectroscopy of crystalline acetanilide. On the other hand, vibrational self-trapping of the amide-I band can naturally explain the 2D-IR response.

  2. Effects of aging on the structural, mechanical, and thermal properties of the silicone rubber current transformer insulation bushing for a 500 kV substation.

    PubMed

    Wang, Zhigao; Zhang, Xinghai; Wang, Fangqiang; Lan, Xinsheng; Zhou, Yiqian

    2016-01-01

    In order to analyze the cracking and aging reason of the silicone rubber current transformer (CT) insulation bushing used for 8 years from a 500 kV alternating current substation, characteristics including Fourier transform infrared (FTIR) spectroscopy, mechanical properties analysis, hardness, and thermo gravimetric analysis have been carried out. The FTIR results indicated that the external surface of the silicone rubber CT insulation bushing suffered from more serious aging than the internal part, fracture of side chain Si-C bond was much more than the backbone. Mechanical properties and thermal stability results illustrated that the main aging reasons were the breakage of side chain Si-C bond and the excessive cross-linking reaction of the backbone. This study can provide valuable basis for evaluating degradation mechanism and aging state of the silicone rubber insulation bushing in electric power field. PMID:27390631

  3. Administration for Community Living

    MedlinePlus

    ... by Acting Assistant Secretary for Aging and ACL Administrator Edwin Walker at the HCBS Conference (08/29/ ... Remarks by Assistant Secretary on Aging and ACL Administrator Kathy Greenlee at the n4a Answers on Aging ...

  4. The New Administrative Computing.

    ERIC Educational Resources Information Center

    Green, Kenneth C.

    1988-01-01

    The past decade has seen dramatic changes in administrative computing, including more systems, more applications, a new group of computer users, and new opportunities for computer use in campus administration. (Author/MSE)

  5. Transportation Security Administration

    MedlinePlus

    ... content Official website of the Department of Homeland Security Transportation Security Administration When I fly can I bring my... ... to know if you could bring through the security checkpoint. Main menu Administrator Travel Security Screening Special ...

  6. NASA, NOAA administrators nominated

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    President Ronald Reagan recently said he intended to nominate James Montgomery Beggs as NASA Administrator and John V. Byrne as NOAA Administrator. These two positions are key scientific posts that have been vacant since the start of the Reagan administration on January 20. The President also said he intends to nominate Hans Mark as NASA Deputy Administrator. At press time, Reagan had not designated his nominee for the director of the Office of Science and Technology Policy.

  7. A Philosophy of Administration.

    ERIC Educational Resources Information Center

    Bruening, William H.

    Justification is given for paying relatively large salaries to college administrators, specifically the president or chancellor and the chief academic officer. Three administrative task areas are discussed as criteria: management, administration per se, and leadership. It is contended that only leadership can be used as a criterion for…

  8. School Business Administration.

    ERIC Educational Resources Information Center

    Jordan, K. Forbis; And Others

    This textbook reviews the principal concerns within each of 13 major responsibility areas in school business administration. The first chapter assesses the political, social, and economic context in which schools function and school administrators work. The role and function of the school business administrator within this context is addressed in…

  9. Veterans Administration Databases

    Cancer.gov

    The Veterans Administration Information Resource Center provides database and informatics experts, customer service, expert advice, information products, and web technology to VA researchers and others.

  10. CDS - Database Administrator's Guide

    NASA Astrophysics Data System (ADS)

    Day, J. P.

    This guide aims to instruct the CDS database administrator in: o The CDS file system. o The CDS index files. o The procedure for assimilating a new CDS tape into the database. It is assumed that the administrator has read SUN/79.

  11. Vocational Education Administration Handbook.

    ERIC Educational Resources Information Center

    Ryals, Karen, Ed.; Doherty, Susan Sloan, Ed.

    This handbook for vocational administrators presents an overview of vocational education programs, services, and administrative structures in Alaska. The manual contains three parts. The first, brief section introduces secondary vocational education and lists its enabling legislation. The second part presents a detailed overview of vocational…

  12. Reframing Research Administration

    ERIC Educational Resources Information Center

    Cole, Sharon Stewart

    2010-01-01

    The purpose of this paper is to inform administrators and organizational leaders that a change in the support offered to faculty and the environment of research administration is desirable. This recommendation is supported by the results of a Delphi study that was undertaken to gather expert opinions and recommendations from research faculty…

  13. Justifying Educational Administration.

    ERIC Educational Resources Information Center

    Evers, Colin; Lakomski, Gabriele

    1993-01-01

    The traditional conceptions of science dominating educational administration are mistaken. Unacceptable epistemologies, like those implicit in logical positivism, justify knowledge solely in terms of empirical adequacy. An improved science of educational administration embraces a coherent global theory accounting for all the phenomena of human…

  14. Migrant Education Administrative Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    Relating specifically to the North Carolina migrant education program's administrative responsibilities, this guide is designed to aid administrators in program management, monitoring project activities, project evaluation, self-assessment, determining needs for training and staff development, site-visit preparation, policy development, and…

  15. DIMENSIONS OF ADMINISTRATIVE PERFORMANCE.

    ERIC Educational Resources Information Center

    HEMPHILL, JOHN; AND OTHERS

    THE MAJOR OBJECTIVES WERE TO DEVELOP CRITERIA FOR THE EVALUATION OF SCHOOL ADMINISTRATION, TO DEFINE THE NATURE OF THE JOB, AND TO DEVELOP AN INSTRUMENT FOR THE SELECTION OF ADMINISTRATORS. THE ELEMENTARY SCHOOL PRINCIPAL WAS CHOSEN FOR THE STUDY BECAUSE OF THE HOST OF PROBLEMS RELATED TO THE CONDUCT OF AN EDUCATIONAL PROGRAM, INCLUDING THE…

  16. Test Administration Models

    ERIC Educational Resources Information Center

    Becker, Kirk A.; Bergstrom, Betty A.

    2013-01-01

    The need for increased exam security, improved test formats, more flexible scheduling, better measurement, and more efficient administrative processes has caused testing agencies to consider converting the administration of their exams from paper-and-pencil to computer-based testing (CBT). Many decisions must be made in order to provide an optimal…

  17. Networked Administration Streamlines Operations.

    ERIC Educational Resources Information Center

    School Planning and Management, 1996

    1996-01-01

    An Iowa school district has retooled its computer systems for more standardized administration. In addition to administration, the district is doing inhouse databasing of financial accounting, and doing inhouse scheduling and grade reporting. A partnership with the Chamber of Commerce contributed $500,000 for the network system. (MLF)

  18. The Administrative Power Grab

    ERIC Educational Resources Information Center

    Sorenson, Richard D.

    2007-01-01

    Administrative power for some school teachers can be an aphrodisiac that can be applied negatively, especially when a leader has devastating instinct for the weaknesses of others. A leader's intellect and heart closes shop and ceases to function when drunk on power. In this article, the author describes how the use of administrative power can be…

  19. Champions of Children. Administrators . . .

    ERIC Educational Resources Information Center

    Chaffee, John; Olds, H. Robert

    Today, in an era of taxpayer revolts, lack of clarity in values, and changing family structure, children need advocates in the political arena as well as in the schools. This pamphlet suggests that administrators are in an excellent position to defend the rights of children on all fronts. It focuses on what administrators have done and specific…

  20. Administration for Student Development.

    ERIC Educational Resources Information Center

    Bergen, J. J., Ed.

    This collection of papers focuses on school administration and its relation to students. It is contended that toay's student matures earlier; has higher expectations; is more affluent; is more isolated from adults; is more critical and outspoken; and, therefore, must be heard by teachers and administrators. A related document is EA 001578.…

  1. Administration of Computer Resources.

    ERIC Educational Resources Information Center

    Franklin, Gene F.

    Computing at Stanford University has, until recently, been performed at one of five facilities. The Stanford hospital operates an IBM 370/135 mainly for administrative use. The university business office has an IBM 370/145 for its administrative needs and support of the medical clinic. Under the supervision of the Stanford Computation Center are…

  2. Rural Administrative Leadership Handbook.

    ERIC Educational Resources Information Center

    Tift, Carolyn

    This resource book on rural administrative leadership is the result of 1988 interviews with school administrators involved in successful rural educational programs. The material is divided into eight chapters, each self-contained for separate use. Chapter 1, "Getting to Know the Community," addresses qualities of living and working in rural…

  3. School Business Administration.

    ERIC Educational Resources Information Center

    Jordan, K. Forbis; Webb, L. Dean

    1986-01-01

    Reviews the societal and organizational changes affecting school business administration, describes major activities encompassed in the practice of school business administration, and reviews current literature specifically related to such activities as electronic data processing, fiscal planning and budgeting, purchasing and property management,…

  4. The Administrative Team.

    ERIC Educational Resources Information Center

    Ohio Association of Elementary School Principals, Westerville.

    Although needs of school districts vary with size, degree of teacher negotiation procedures, and type of community involvement, the administrative team model is presented as an effective, appropriate administrative organization. Based on an assumption that each level of authority in a school district possesses and exercises expertise and unique…

  5. Handbook for Alumni Administration.

    ERIC Educational Resources Information Center

    Webb, Charles H., Ed.

    A definitive look at the field of alumni administration is presented, noting that the subject has until now received little attention. The 34 chapters are divided into nine sections: an overview of alumni administration; alumni as an essential resource; people management; budget and records; programming; communications; alumni education programs…

  6. 47 CFR 54.715 - Administrative expenses of the Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Administrative expenses of the Administrator. 54.715 Section 54.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Administration § 54.715 Administrative expenses of the Administrator. (a) The annual administrative expenses...

  7. 47 CFR 54.715 - Administrative expenses of the Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Administrative expenses of the Administrator. 54.715 Section 54.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Administration § 54.715 Administrative expenses of the Administrator. (a) The annual administrative expenses...

  8. Head of Administration

    NASA Astrophysics Data System (ADS)

    2005-03-01

    Purpose and scope of the position: The main task is to provide efficient administrative services and advice to the Director General, Division Leaders and to staff members in the scientific and technical areas in the fields of financial planning and accounting, personnel management, purchasing, legal and contractual matters, information systems and building and site maintenance. As a member of the ESO Management the Head of Administration contributes essentially to the development of the overall policy, strategic planning, relations to the members of the personnel and maintains professional contacts at highest level outside the Organisation. ESO employs in total approximately 650 staff members and the Administration Division comprises the Administration at the Headquarters in Garching near Munich and the Administration in Santiago (Chile). The successful candidate will be supported by some 50 qualified staff members.

  9. Occupational exposure to electric and magnetic fields during tasks at ground or floor level at 110 kV substations in Finland.

    PubMed

    Korpinen, Leena; Pääkkönen, Rauno

    2016-09-01

    The aim was to investigate occupational exposure to electric and magnetic fields during tasks at ground or floor level at 110 kV substations in Finland and to compare the measured values to Directive 2013/35/EU. Altogether, 347 electric field measurements and 100 magnetic field measurements were performed. The average value of all electric fields was 2.3 kV/m (maximum 6.4 kV/m) and that of magnetic fields was 5.8 µT (maximum 51.0 µT). It can be concluded that the electric and magnetic field exposure at ground or floor level is typically below the low action levels of Directive 2013/35/EU. The transposition of the directive will not create new needs to modify the work practice of the evaluated tasks, which can continue to be performed as before. However, for workers with medical implants, the exposure may be high enough to cause interference. PMID:27075421

  10. Occupational exposure to electric and magnetic fields during tasks at ground or floor level at 110 kV substations in Finland

    PubMed Central

    Korpinen, Leena; Pääkkönen, Rauno

    2016-01-01

    The aim was to investigate occupational exposure to electric and magnetic fields during tasks at ground or floor level at 110 kV substations in Finland and to compare the measured values to Directive 2013/35/EU. Altogether, 347 electric field measurements and 100 magnetic field measurements were performed. The average value of all electric fields was 2.3 kV/m (maximum 6.4 kV/m) and that of magnetic fields was 5.8 µT (maximum 51.0 µT). It can be concluded that the electric and magnetic field exposure at ground or floor level is typically below the low action levels of Directive 2013/35/EU. The transposition of the directive will not create new needs to modify the work practice of the evaluated tasks, which can continue to be performed as before. However, for workers with medical implants, the exposure may be high enough to cause interference. PMID:27075421

  11. Serving the Space Administration

    ERIC Educational Resources Information Center

    Campbell, Jack E.; Thompson, Arthur W.

    1974-01-01

    The purpose of the current program was to establish an upward mobility program that afforded employees an opportunity to improve their credibility in job opportunity selection under the directives of the National Aeronautics and Space Administration. (Author/RK)

  12. Copyright Implications for Administrators.

    ERIC Educational Resources Information Center

    Simpson, Carol Mann

    1994-01-01

    Discusses copyright compliance policies for school administrators and the librarian's role in policy implementation. Topics addressed include fines; court litigation; monitoring compliance; training sessions for teachers and staff; computer software audits; and sources for more information. (LRW)

  13. Goldstone (GDSCC) administrative computing

    NASA Technical Reports Server (NTRS)

    Martin, H.

    1981-01-01

    The GDSCC Data Processing Unit provides various administrative computing services for Goldstone. Those activities, including finance, manpower and station utilization, deep-space station scheduling and engineering change order (ECO) control are discussed.

  14. Confrontation and Administrative Response

    ERIC Educational Resources Information Center

    Auerbach, Arnold J.

    1969-01-01

    Describes some of the sociological and psychological effects of organizational conflict and offers 10 operational principles to guide public administrators of schools and social agencies in meeting the confrontation tactics of activist groups. (JH)

  15. One for the Administrators

    ERIC Educational Resources Information Center

    American School and University, 1978

    1978-01-01

    Earth berms, a heavily insulated roof, and a narrow band of thermal pane windows, save energy at the administrative headquarters of the Anoka Hennepin school district in Coon Rapids, a suburb of Minneapolis, Minnesota. (Author/MLF)

  16. The Purchasing Administrator.

    ERIC Educational Resources Information Center

    Ferguson, Joyce E.

    1985-01-01

    Discusses the professional purchasing administrator's most common areas of responsibility: (1) staffing the department, (2) maintaining professional objectivity in vendor relationships, (3) following bidding policies, (4) receiving user input and feedback, and (5) seeking local equipment service and maintenance. (MLF)

  17. Introducing Public Administration

    ERIC Educational Resources Information Center

    Stein, Jay W.

    1975-01-01

    The use of documents and the analysis of definitions are recommended as a means for adding zest to an introduction to public administration course to obtain student interest and motivation. (Author/ND)

  18. Astronaut Administrator Richard Truly

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Astronaut Richard H. Truly, pilot of the Space Shuttle Columbia on mission STS-2 and Commander of Shuttle Challenger on mission STS-8, became NASA's eighth Administrator on July 1, 1989. One day earlier he concluded a 30 year Naval career retiring as a Vice Admiral. He was the first astronaut to head the nation's civilian space agency. Truly became Deputy Associate Administrator for Space Flight on February 20, 1986. In this position, he led the painstaking rebuilding of the Space Shuttle program less than one month after the Challenger disaster. This was highlighted by the much heralded 'Return to Flight' on September 29, 1988 with the launch of Shuttle Discovery, 32 months after Challenger's final flight. On February 12th, 1992 Richard Truly resigned as NASA Administrator at the request of President George Bush.

  19. Study of insulator mortars. Part 1: Comparative analysis of the freeze-thaw durability of cement grouts and mortars in line and sub-station porcelain insulators

    SciTech Connect

    Durand, B.

    1995-11-01

    As part of a major study being conducted on the durability of insulators in transmission lines and sub-station equipment comprising insulating components, seven Hydro-Quebec suppliers have contributed a number of samples made from the cement grouts and mortars used in manufacturing their equipment. The manufacturers` samples and those made in house were tested in the laboratory for compressive, tensile and flexural strength, as well as freezing and thawing, shrinkage/expansion to wetting and drying, autoclave expansion and carbonation. This paper presents the results of the freeze-thaw tests that consisted in determining changes in mass and length, uniaxial compressive strength, and tensile and flexural strength. The freeze-thaw test was conducted according to ASTM Test Method C666(B), which was used to determine the resistance of concrete specimens to rapidly repeated cycles of freezing and thawing (freezing in air at {minus}18 C and thawing in water at 4 C, 3-h cycles, 530 cycles in total). Two specific trends were noted: (1) eleven series of prisms showed less than 0.055% linear expansion after 530 freeze-thaw cycles, and (2) eight series of prisms showed more than 0.200% linear expansion. Two definite trends also emerged regarding changes in mass: (1) twelve series of prisms showed little change in mass after 530 freeze-thaw cycles and (2) seven series of prisms registered substantial changes in mass, in some cases over 10%. An analysis of the test results for compressive, tensile and flexural strengths showed that the specimens exhibiting little increase in expansion and loss of mass had an increase in mechanical resistance during the freeze-thaw test, while the opposite was true for specimens that showed considerable linear expansion and loss of mass, i.e. their compressive, tensile and flexural strengths decreased during the freeze-thaw test.

  20. Computer hardware fault administration

    DOEpatents

    Archer, Charles J.; Megerian, Mark G.; Ratterman, Joseph D.; Smith, Brian E.

    2010-09-14

    Computer hardware fault administration carried out in a parallel computer, where the parallel computer includes a plurality of compute nodes. The compute nodes are coupled for data communications by at least two independent data communications networks, where each data communications network includes data communications links connected to the compute nodes. Typical embodiments carry out hardware fault administration by identifying a location of a defective link in the first data communications network of the parallel computer and routing communications data around the defective link through the second data communications network of the parallel computer.

  1. MCS Systems Administration Toolkit

    2001-09-30

    This package contains a number of systems administration utilities to assist a team of system administrators in managing a computer environment by automating routine tasks and centralizing information. Included are utilities to help install software on a network of computers and programs to make an image of a disk drive, to manage and distribute configuration files for a number of systems, and to run self-testss on systems, as well as an example of using amore » database to manage host information and various utilities.« less

  2. Telecommunications administration standard

    SciTech Connect

    Gustwiller, K.D.

    1996-05-01

    The administration of telecommunications is critical to proper maintenance and operation. The intent is to be able to properly support telecommunications for the distribution of all information within a building/campus. This standard will provide a uniform administration scheme that is independent of applications, and will establish guidelines for owners, installers, designers and contractors. This standard will accommodate existing building wiring, new building wiring and outside plant wiring. Existing buildings may not readily adapt to all applications of this standard, but the requirement for telecommunications administration is applicable to all buildings. Administration of the telecommunications infrastructure includes documentation (labels, records, drawings, reports, and work orders) of cables, termination hardware, patching and cross-connect facilities, telecommunications rooms, and other telecommunications spaces (conduits, grounding, and cable pathways are documented by Facilities Engineering). The investment in properly documenting telecommunications is a worthwhile effort. It is necessary to adhere to these standards to ensure quality and efficiency for the operation and maintenance of the telecommunications infrastructure for Sandia National Laboratories.

  3. Study Shows Administrative Shortage.

    ERIC Educational Resources Information Center

    Sullivan, John R., Jr.

    1989-01-01

    Summarizes "Administrative Shortage in New England: The Evidence, the Causes, the Recommendations." High pressure, long hours, low salaries, and high housing costs are among the reasons cited for the shortage. Recommendations are centered on role identity, staff support, training, and recruitment. (SI)

  4. Central Administration. Interim Report.

    ERIC Educational Resources Information Center

    Duke Univ., Durham, NC.

    Because the configuration of the central administration of Duke University has recently been modified, this report was prepared: (1) to describe the changes and rearrangements thus far introduced; (2) to propose desirable clarifications not yet provided; (3) to recommend certain additional changes where these may already appear to be needed; and…

  5. Guidebook for School Administrators.

    ERIC Educational Resources Information Center

    Hess, Fritz, Ed.

    To provide guidance and advice regarding day-to-day responsibilities of new and experienced school administrators and superintendents in New York State, this compendium of knowledge and advice submitted by practitioners is presented with emphasis on all major aspects of superintendency. The section on general aspects of superintendency includes…

  6. Redis database administration tool

    2013-02-13

    MyRedis is a product of the Lorenz subproject under the ASC Scirntific Data Management effort. MyRedis is a web based utility designed to allow easy administration of instances of Redis databases. It can be usedd to view and manipulate data as well as run commands directly against a variety of different Redis hosts.

  7. Female Administrator Acceptance.

    ERIC Educational Resources Information Center

    Pawlitschek, Elizabeth Ann

    The number of women in educational administration is declining, despite official efforts to end sex discrimination. Women are hampered on the way to obtaining an adequate education, finding roadblocks from sex bias in elementary readers to discrimination in graduate programs; are considered responsible for home and children even when working full…

  8. Hospital Library Administration.

    ERIC Educational Resources Information Center

    Cramer, Anne

    The objectives of a hospital are to improve patient care, while the objectives of a hospital library are to improve services to the staff which will support their efforts. This handbook dealing with hospital administration is designed to aid the librarian in either implementing a hospital library, or improving services in an existing medical…

  9. Discretionary Grants Administration Manual.

    ERIC Educational Resources Information Center

    Office of Human Development Services (DHHS), Washington, DC.

    This manual sets forth applicable administrative policies and procedures to recipients of discretionary project grants or cooperative agreements awarded by program offices in the Office of Human Development Services (HDS). It is intended to serve as a basic reference for project directors and business officers of recipient organizations who are…

  10. [Rural School Administrator's Resources.

    ERIC Educational Resources Information Center

    AEL, Inc., Charleston, WV.

    This packet contains resources on five topics relevant to rural school administrators. "Assessing Parent Involvement: A Checklist for Rural Schools": discusses educator beliefs that support successful parent engagement programs, challenges and advantages of rural schools attempting to involve parents and community, and aspects of successful…

  11. Information for School Administrators.

    ERIC Educational Resources Information Center

    Kowitz, Gerald T.; And Others

    Modern management theory, based on the reduction of uncertainties, demands the collection and manipulation of large amounts of information. School Administrators choke in the process of trying to digest a proliferation of data, only some of which are useful. The aims of the study were to explore the extent to which large amounts of data could be…

  12. Research Administration: Lessons Learned.

    ERIC Educational Resources Information Center

    Dummer, George H.

    1995-01-01

    The ways in which accountability issues have affected federal-university relationships, particularly in the area of academic research, are examined. Lessons university administrators have learned since issuance of Office of Management and Budget Circular A-21 in 1958, Congressional hearings on the operations of the National Institutes of Health…

  13. Administrators Confront Student "Sexting"

    ERIC Educational Resources Information Center

    Manzo, Kathleen Kennedy

    2009-01-01

    Cellphone-savvy students have created instructional and disciplinary challenges for educators for years. But the recent emergence of "sexting" by adolescents over their mobile phones caught many school administrators off guard, and the practice is prompting efforts around the country to craft policy responses. Students' sharing of nude or…

  14. Championing the Latino Administrator

    ERIC Educational Resources Information Center

    Garcia, Carlos A.

    2011-01-01

    When the author worked as a vice principal at a K-8 school in Watsonville, California, a school predominantly filled with migrant workers' children, he felt a lack of support as a Latino as he began moving up into school administration. He also continued to see what he had seen as a teacher--which was how underserved minority students were. These…

  15. Hispanic Administrators in Kentucky

    ERIC Educational Resources Information Center

    Ballestero, Victor; Wright, Sam

    2008-01-01

    The study was designed to provide information on Hispanic administrators in the Commonwealth of Kentucky. The data was obtained from Kentucky school Superintendents or their designees in 175 public school districts. The Hispanic survey contained six questions. The survey was mailed to Kentucky Superintendents on April 21, 2008. A follow-up survey…

  16. Educational Administration's Weber.

    ERIC Educational Resources Information Center

    Gronn, Peter

    1994-01-01

    Discusses Max Weber's importance in Greenfield's work, particularly in Greenfield and Ribbins'"Greenfield on Educational Administration" (1993). In concentrating on human actors' subjective understanding, Greenfield was a faithful Weberian. However, he deviated from Weber by disavowing structural explanations of social and organizational…

  17. "Complicating" Educational Administrators.

    ERIC Educational Resources Information Center

    Bell, Colleen S.

    Administrators desiring to lead organizations that will adapt and survive in a complex environment like today's public schools need to develop what Karl Weick calls "complicated" understanding of "requisite variety." The law of requisite variety states that a diverse and complicated environment demands similar diversity from its inhabitants if…

  18. A Treatise on Administration.

    ERIC Educational Resources Information Center

    Moore, Thomas R.

    1988-01-01

    Expands Henri Fayol's definition of the administrative process to include a humanistic approach involving planning, organizing, implementing, controlling, evaluating, and satisfying functions. This empirical definition differs from some theoretical approaches by looking beyond resource consumption to consider ecological effects on the environment…

  19. Administrative Uses of Microcomputers.

    ERIC Educational Resources Information Center

    Crawford, Chase

    1987-01-01

    This paper examines the administrative uses of the microcomputer, stating that high performance educational managers are likely to have microcomputers in their organizations. Four situations that would justify the use of a computer are: (1) when massive amounts of data are processed through well-defined operations; (2) when data processing is…

  20. Administrative Utility Analysis: Appendices.

    ERIC Educational Resources Information Center

    Peat, Marwick, Mitchell and Co., San Juan, Puerto Rico.

    Appendixes to a study on administrative utility analysis and vocational education programs for the Area of Vocational and Technical Education (AVTE) in the Puerto Rico Department of Education contain the planning and budgeting system elements, position descriptions, and information on the growth of vocational education in Puerto Rico. The elements…

  1. Educator Effectiveness Administrative Manual

    ERIC Educational Resources Information Center

    Pennsylvania Department of Education, 2014

    2014-01-01

    The goal of this manual is to provide guidance in the evaluation of educators, highlight critical components of effectiveness training, and offer opportunities for professional growth. The term "educator" includes teachers, all professional and temporary professional employees, education specialists, and school administrators/principals.…

  2. Standards and Administration.

    ERIC Educational Resources Information Center

    Gross, S. P.

    1978-01-01

    Presents a literature review of water quality standards and administration, covering publications of 1976-77. Consideration is given to municipal facilities, National Pollutant Discharge Elimination Systems, regional and international water quality management, and effluent standards. A list of 99 references is also presented. (HM)

  3. Migrant Education Administrative Handbook.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Bureau of Migrant Education.

    Intended to provide information pertaining to the administration of migrant education projects in Louisiana, the handbook is divided into two sections: basic guidelines for program operations and support services--nursing. Section I covers the Federal and State migrant program, local migrant projects, project personnel and staff development, and…

  4. Using Administrative Data. Introduction.

    ERIC Educational Resources Information Center

    DiLeonardi, Joan W.; Yuan, Ying-Ying T.

    2000-01-01

    Discusses the value of administrative data to child welfare researchers. Considers issues in using client records--confidentiality, selection of data, historical data, sampling reliability, replication of findings, and access to data--that can be resolved in standardized ways. Notes other problematic issues, such as greater distance from subject,…

  5. Standards for Administrators.

    ERIC Educational Resources Information Center

    Lashway, Larry

    1998-01-01

    This newsletter reviews five reports that address the implications of standards for administrators. These texts include "Designing and Implementing Standards-Based Accountability System" (Education Commission of the States), which describes some of the policy implications of standards-driven accountability; "Why Principals Fail: Are National…

  6. Administrative Effectiveness in Higher Education.

    ERIC Educational Resources Information Center

    Whetten, David A.; Cameron, Kim S.

    1985-01-01

    Determinants of organizational and administrative effectiveness in higher education are discussed, and eight administrator characteristics associated with maintaining and enhancing institutional effectiveness are identified. (MSE)

  7. 7. Administrative structures.

    PubMed

    2014-05-01

    The basic systems of any society rarely can operate independently. Instead, they are dependent and often interdependent upon other entities. Such entities control the resources within their respective systems. Thus, coordination and control agencies require contracts or memoranda of understanding with these entities in order to assure access to the resources required during a crisis. These administrative structures include: (1) governmental institutions and agencies, including the military; (2) intergovernmental organisations; (3) nongovernmental organisations; (4) commercial private sector organisations; and (5) academic institutions. These dependencies create potential barriers to the provision of coordination and control including: (1) the complexity of the administrative structures with which coordination and control must interact; (2) the location of resources; (3) finding responsible person(s); (4) the competence and compatibility; (5) methods of access; (6) payment; (7) contracts and memoranda of understanding; (8) inventories of accessible resources; (9) competition for the mandate, power, and resources; and (10) jealousy. The need for potential interactions between administrative structures requires that agreements for the sharing of resources during crises be reached as part of planning and preparedness. Gaining an understanding of these relationships is an important area for research. PMID:24785804

  8. Domino System Administration

    NASA Astrophysics Data System (ADS)

    Kirkland, R.

    Need a concise, practical explanation about the new features of Domino, and how to make some of the advanced stuff really work? You need answers and solutions from someone who's been in the trenches. You want information from someone like you, who has worked with the product for years, and understands what it is you need to know. Domino System Administration from New Riders is the answer-the first book on Domino that attacks the technology at the professional level, with practical, hands-on assistance to get Domino 5 running in your organization.

  9. A Review of the Literature on College Administrators and Administrations.

    ERIC Educational Resources Information Center

    Nash, George; Uhse, Stefan

    A review of the extensive literature on college administration and college administrators reveals there are relatively few empirical studies in the field. It was also observed that: there is widespread agreement on a few broad principles; there has been a heavy emphasis on human relations and proper administrative procedures; there are fundamental…

  10. Administrative Aspects of Human Experimentation.

    ERIC Educational Resources Information Center

    Irvine, George W.

    1992-01-01

    The following administrative aspects of scientific experimentation with human subjects are discussed: the definition of human experimentation; the distinction between experimentation and treatment; investigator responsibility; documentation; the elements and principles of informed consent; and the administrator's role in establishing and…

  11. Administrative Law and Organization Theory

    ERIC Educational Resources Information Center

    Evan, William M.

    1977-01-01

    Considered are some trends in American administrative law, some trends in organization theory, a model of the administrative process, and several potentially useful research strategies. The analysis has implications for comparative research on legal systems. (Author/LBH)

  12. Administration for Children and Families

    MedlinePlus

    ... Office ACF Help Center (help-center) Administration for Native Americans (ANA) Administration on Children, Youth and Families (ACYF) ... Global Populations Hispanic Outreach Homelessness Human Trafficking LGBT Native Americans/Tribes Unaccompanied Children Grants & Funding Expand How to ...

  13. Selecting the Administrative Computing Executive.

    ERIC Educational Resources Information Center

    Bielec, John A.

    1985-01-01

    Important steps in the computing administrator selection process are outlined, including: reviewing the administrative computing organization, determining a search methodology, selecting a search or screening committee, narrowing the candidate pool, scheduling interviews and evaluating candidates, and conducting negotiations. (MSE)

  14. Administrative Implications of Curriculum Reform

    ERIC Educational Resources Information Center

    Abbott, Max G.; Eidell, Terry L.

    1970-01-01

    The director of the Center for the Advanced Study of Educational Administration at the University of Oregon and one of his associates discuss the new role of administration in an individual-oriented educational system. (AA)

  15. Three Generations of Educational Administration.

    ERIC Educational Resources Information Center

    Sharpe, F. G.

    This paper compares two Australian educational administration texts published in 1963 to reflect critically on the radical changes that have occurred in educational administration in Australia since then. The books are "Headmasters for Better Schools," by Bassett, Crane, and Walker; and "Training the Administrator," by Cunningham and Radford. The…

  16. Special Education Administration Training Program.

    ERIC Educational Resources Information Center

    Watherman, Richard F.; Hollingsworth, Sue Ann

    Presented are course materials from a competency based education program in special education administration. It is explained that the Special Education Administration Training Program (SEATP) is designed for continuing education of administrators. Materials are divided into three self contained curriculum areas: fiscal management, personnel…

  17. The Future of Public Administration.

    ERIC Educational Resources Information Center

    Cleveland, Harlan

    Past approaches to public administration, the diminishing distinctions between foreign and domestic policy, the role of the public administrator, and leadership qualities are discussed. As a relatively young discipline, public administration first focused on scientific management (1920's). It then shifted to the art and science of getting things…

  18. Administrative Uses of the Microcomputer.

    ERIC Educational Resources Information Center

    Spuck, Dennis W.; Atkinson, Gene

    1983-01-01

    An outline of microcomputer applications for administrative computing in education is followed by discussions of aspects of office automation, database management systems, management information systems, administrative computer systems, and software. Several potential problems relating to administrative computing in education are identified.…

  19. Certification of Financial Aid Administrators

    ERIC Educational Resources Information Center

    Peterson, Stacey A.

    2011-01-01

    The certification of financial aid administrators has been debated for over 37 years. A job satisfaction survey conducted by the National Association of Student Financial Aid Administrators (NASFAA, 2008a) revealed that college and university administrators' perceptions of the efficiency, effectiveness, and quality of the services provided by the…

  20. Straight Talk about School Administrators.

    ERIC Educational Resources Information Center

    Association of California School Administrators.

    In this report, the Association of California School Administrators examined some of the myths and misrepresentations about administration in California's public schools. Specifically, it examined the following five myths: (1) A lot of money that could be better spent in the classroom is being wasted on administration. (2) There are too many…

  1. Administrators' Decisions about Resource Allocation

    ERIC Educational Resources Information Center

    Knight, William E.; Folkins, John W.; Hakel, Milton D.; Kennell, Richard P.

    2011-01-01

    Do academic administrators make decisions about resource allocation differently depending on the discipline receiving the funding? Does an administrator's academic identity influence these decisions? This study explored those questions with a sample of 1,690 academic administrators at doctoral-research universities. Participants used fictional…

  2. Key Obama officials leave administration

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2013-01-01

    Secretary of the Interior Ken Salazar is one of the latest members of the Obama administration to announce that he is leaving his position near the start of President Obama's second term in office. Salazar, who has served as interior secretary since January 2009, intends to leave the department by the end of March, the department noted on 16 January. Salazar joins a number of other key officials who are planning to leave the administration. They include Environmental Protection Agency administrator Lisa Jackson, National Oceanic and Atmospheric Administration administrator Jane Lubchenco, and U.S. Geological Survey director Marcia McNutt.

  3. Advanced concepts for a 1200-kV shunt reactor. Volume I. Exploration of new concepts for inductive shunt reactor designs for integration into a 1200-kV gas insulated substation. Final report

    SciTech Connect

    Not Available

    1981-03-27

    The objective of this program is to explore new concepts for inductive shunt reactor designs for integration into a 1200 kV gas insulated substation. The most promising design should exhibit low dimensional profile with reduced weight, lower losses, and lower noise level when compared with units of equivalent rating designed with present day technology. To meet the objectives several advanced concepts of shunt reactor design were studied. The major concepts explored in this project reactor design were studied. The major concepts explored in this project included: sulfur hexafluoride gas insulated, foil type windings, high reluctance core materials, and heat transfer via the gaseous medium. As a result of the study, a shunt reactor was designed through an application of the advanced concepts with the conclusions that the program objectives could be attained.

  4. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  5. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  6. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  7. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  8. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  9. Child Nutrition Programs. Administrative Manual.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    Recognizing the importance of efficient and effective program administration for the success of Utah's Child Nutrition Programs, the State Office of Education developed a manual to assist local program administrators in using the U.S. Department of Agriculture's (USDA's) programs. This document contains Part 1 of the manual's four interrelated…

  10. Principals' Values in School Administration

    ERIC Educational Resources Information Center

    Aslanargun, Engin

    2012-01-01

    School administration is value driven area depending on the emotions, cultures, and human values as well as technique and structure. Over the long years, educational administration throughout the world have experienced the influence of logical positivism that is based on rational techniques more than philosophical consideration, ignored values and…

  11. Network Systems Administration Needs Assessment.

    ERIC Educational Resources Information Center

    Lexington Community Coll., KY. Office of Institutional Research.

    In spring 1996, Lexington Community College (LCC) in Kentucky, conducted a survey to gather information on employment trends and educational needs in the field of network systems administration (NSA). NSA duties involve the installation and administration of network operating systems, applications software, and networking infrastructure;…

  12. Administrative Style and Leadership Effectiveness.

    ERIC Educational Resources Information Center

    Thomas, Vernadine; Ogletree, Earl J.

    Trends over the past 25 years in research on evaluation of school administrative leadership are analyzed in this summary report. Administrator evaluation became a concern as the principal's influence on the performance and attitudes of faculty and staff was realized. Research on organizational psychology demonstrated the relationship between…

  13. Public Finance Administration. Second Edition.

    ERIC Educational Resources Information Center

    Reed, B. J.; Swain, John W.

    This book is intended for the nonexpert in finance who has a public administration background. It opens with a broad introduction to public finance administration and how this job is related to public budgeting, the practice of public-sector accounting, and the economic concepts of money and value. Issues surrounding public revenue, its sources,…

  14. Coaches Guide to Sport Administration.

    ERIC Educational Resources Information Center

    Leith, Larry M.

    This guide for athletic coaches offers a practical approach to the administrative functions of organizing, planning, leading, and controlling. Included are chapters on coaching administration, fund raising, organizing competitions, and designing effective budgets and controls. The guide addresses the following topics: (1) the categories of…

  15. In Praise of Fewer Administrators.

    ERIC Educational Resources Information Center

    Nichols, Donald D.; Stuart, William H.

    In response to increasing financial pressures, Oakland Community College instituted a policy in the 1970s to reduce the number of college administrators as a means of saving staff costs. While student enrollments increased from 11,700 in 1970 to 24,000 in 1980, the number of administrators fell from 84 to 32. This reduction was realized through…

  16. Canadian and Comparative Educational Administration.

    ERIC Educational Resources Information Center

    Farquhar, Robin H., Ed.; Housego, Ian E., Ed.

    Most of the articles in this book evolved from papers presented during the Fourth Quadrennial International Intervisitation Program in Educational Administration held in Canada in 1978. Its purposes were to inform educational leaders from around the world about educational administration, organization, and policy in Canada and to provide a forum…

  17. The Dissimilarity of Educational Administration

    ERIC Educational Resources Information Center

    Walton, John

    1970-01-01

    The responsibilities of educational administrators do not extend to the products of the educational institutions. Rather, they end at the point where they maintain satisfactory conditions for leisure activities. In this respect, educational administration may serve as a model for the governance of an increasing number of organizations, both public…

  18. Postmodernism in Higher Educational Administration

    ERIC Educational Resources Information Center

    Demaris, Michalyn C.; Kritsonis, William Allan

    2007-01-01

    Postmodernism has many inferences that can be applied to the theory and practice of higher educational administration. Today, in higher education administrators are continuously focused on strategies that will ensure the future of minority educational institutions. As a result postmodernism is an important factor in the future of higher…

  19. Status of Practice Administration Curricula.

    ERIC Educational Resources Information Center

    Manski, Richard J.; And Others

    1992-01-01

    A national survey of 51 dental schools gathered information about curricula in dental practice administration, focusing on curriculum format, course content, course hours, and faculty in seven major content areas. Results are summarized, and it is concluded that practice administration curricula are mature and secure, but in some cases inadequate.…

  20. Administrative Support for Board Members

    ERIC Educational Resources Information Center

    McAdams, Donald R.

    2006-01-01

    In this article, the author discusses the need of administrative support for board members. An effective board services office can help a lot in attracting and retaining community leaders. Board members need administrative support to help them manage events, records, communications, scheduling, correspondence and constituent service. In small to…

  1. Preparing Administrators for Connected Schools.

    ERIC Educational Resources Information Center

    Ross, Tweed W.

    New technology, in the form of electronic connectivity, has opened up vast new arenas for educational development. Many administrators, however, have not been prepared for the sudden change brought about by such technology. The problem for school administrators is how to lead effectively without being overcome by the new information technologies.…

  2. Faculty Perspectives on Administrator Effectiveness.

    ERIC Educational Resources Information Center

    Bess, James L.

    The sources of faculty perspectives on the personal effectiveness of administrators are analyzed. It is proposed that faculty will be predisposed to see administrators in different lights, depending on structural elements in decision making and the orientation of the faculty members. Attention is directed to Talcott Parson's theory for classifying…

  3. The Enigma of Administrative Behaviour.

    ERIC Educational Resources Information Center

    Batchler, Merv

    1981-01-01

    Writers attempting to describe administration have approached the subject from a number of perspectives. Researchers such as Gulick (1937) identified planning, organizing, staffing, directing, coordinating, reporting, and budgeting as functional elements of administration. Hemphill, Griffiths, and Fredericksen (1962), using simulated job settings,…

  4. Cardinal Virtues of Academic Administration

    ERIC Educational Resources Information Center

    Curren, Randall

    2008-01-01

    The aim of this article is to articulate the basic elements of a comprehensive ethic of academic administration, organized around a set of three cardinal virtues: "commitment" to the good of the institution; good administrative "judgment"; and "conscientiousness" in discharging the duties of the office. In addition to explaining this framework and…

  5. Training for Effective School Administrators.

    ERIC Educational Resources Information Center

    Cawelti, Gordon

    Forces of societal change have placed new demands on school administrators for skills to manage schools. The result has been an increasing realization of the need for improved university preparation programs and for more effective Human Resource Development (HRD) for practicing administrators. A growing body of research shows a very positive…

  6. Toward an Applied Administrative Science.

    ERIC Educational Resources Information Center

    Dunbar, Roger L. M.

    1983-01-01

    A study of 65 articles from the 1981 volumes of "Administrative Science Quarterly" and "Harvard Business Review," using smallest space analysis, found that the few studies adopting subjective (instead of objective) approaches to analyzing organizational change were most likely to provide a basis for an applied administrative science. (Author/RW)

  7. Reforming Educational Administration: Ethical Considerations.

    ERIC Educational Resources Information Center

    Calabrese, Raymond L.

    1993-01-01

    Suggests that serious ethical questions regarding the preparation of prospective school administrators have arisen out of the American reform movement. Discusses university-sponsored educational administration programs in the context of the social contract between the university and its various shareholders. Argues that such programs have a major…

  8. The Library Administrator's Automation Handbook.

    ERIC Educational Resources Information Center

    Boss, Richard W.

    One of the most significant decisions in a library administrator's career is the decision to automate one or more of a library's operations. This book describes the present state of local library automation; the planning, selection, and implementation process; and the library administrator's role in the process. The bulk of the text provides a…

  9. The Evaluation of Academic Administrators.

    ERIC Educational Resources Information Center

    Anderson, G. Lester

    Certain principles, assumptions, and caveats are considered in this conference paper that are relevant to the formal evaluation of academic administrators. Academic administration is defined as "leadership and managerial activity associated with teaching, research, educational services such as counseling or placement, and extension activities…

  10. College Administration: Concepts and Techniques.

    ERIC Educational Resources Information Center

    Feltner, Bill D., Ed.

    Ten colleges participated in a project to: (1) help organize and strengthen administrative teams in developing two-year and four-year colleges throughout the Southeast; (2) to assist administrative teams in identifying specific roles for each team member and in developing an understanding of team responsibilities; and (3) to assist administrative…

  11. Transcultural perspectives in nursing administration.

    PubMed

    Andrews, M M

    1998-11-01

    Population demographics are reshaping the healthcare work force with respect to race, ethnicity, gender, national origin, sexual orientation, age, handicap, disability, and related factors as national sensitivity to various forms of diversity grows. Given the demographic trends, it is inevitable that nurse administrators will need skill in transcultural administration as they manage diversity and identify the cultural origins of conflict in the multicultural workplace. Culture influences the manner in which administrators, staff and patients perceive, identify, define and solve problems. In this article, the complex and interrelated factors that influence workplace diversity are examined. PMID:9824983

  12. Reagan Administration Prepares Budget Cuts.

    ERIC Educational Resources Information Center

    Norman, Colin

    1981-01-01

    Describes tentative federal budget cuts affecting science education in the National Science Foundation, National Aeronautics and Space Administration, Department of Energy, National Institutes of Health, and the specific areas these budget cuts will affect. (DS)

  13. Managerial Techniques in Educational Administration.

    ERIC Educational Resources Information Center

    Lane, John J.

    1983-01-01

    Management techniques developed during the past 20 years assume the rational bureaucratic model. School administration requires contingent techniques. Quality Circle, Theory Z, and the McKenzie 7-Framework are discussed as techniques to increase school productivity. (MD)

  14. Administrative Computing: Ideas That Work.

    ERIC Educational Resources Information Center

    White, Lawrence S.

    1984-01-01

    Describes administrative computer use in the Concord (NH) School District. Applications discussed include procurement, cash flow and investment, accounting and control, and teacher contracts, all performed with in-house programs. (MCG)

  15. Rehabilitation and the Veterans' Administration

    NASA Technical Reports Server (NTRS)

    Meister, F.

    1974-01-01

    The Veteran's Administration health care system provides prosthetic and sensory aids for the rehabilitation of neurologically handicapped veterans. Research and development centers include prosthetic clinic teams, orthopedic shops, restoration clinics, bioengineering services, orthotics, etc.

  16. Administrative Actions for Noncompliance; Lesser Administrative Actions. Direct final rule.

    PubMed

    2016-04-01

    The Food and Drug Administration (FDA) is amending the regulation describing lesser administrative actions that may be imposed on an Institutional Review Board (IRB) that has failed to comply with FDA's IRB regulations. We are clarifying that FDA may require the IRB to withhold approval of new FDA-regulated studies, stop the enrollment of new subjects in ongoing studies, and terminate ongoing studies, or any combination of these actions until the noncompliance with FDA's IRB regulations is corrected. We are taking this action to ensure clarity and improve the accuracy of the regulations. PMID:27044118

  17. 48 CFR 702.170-2 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administrator. 702.170-2... DEFINITIONS OF WORDS AND TERMS Definitions 702.170-2 Administrator. Administrator means the Administrator or Deputy Administrator of the U.S. Agency for International Development....

  18. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  19. 7 CFR 1700.26 - Deputy Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Deputy Administrator. 1700.26 Section 1700.26... AGRICULTURE GENERAL INFORMATION Agency Organization and Functions § 1700.26 Deputy Administrator. The Deputy Administrator aids and assists the Administrator. The Deputy Administrator provides overall policy direction...

  20. 7 CFR 1700.26 - Deputy Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Deputy Administrator. 1700.26 Section 1700.26... AGRICULTURE GENERAL INFORMATION Agency Organization and Functions § 1700.26 Deputy Administrator. The Deputy Administrator aids and assists the Administrator. The Deputy Administrator provides overall policy direction...

  1. 7 CFR 1700.26 - Deputy Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Deputy Administrator. 1700.26 Section 1700.26... AGRICULTURE GENERAL INFORMATION Agency Organization and Functions § 1700.26 Deputy Administrator. The Deputy Administrator aids and assists the Administrator. The Deputy Administrator provides overall policy direction...

  2. 7 CFR 1700.26 - Deputy Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Deputy Administrator. 1700.26 Section 1700.26... AGRICULTURE GENERAL INFORMATION Agency Organization and Functions § 1700.26 Deputy Administrator. The Deputy Administrator aids and assists the Administrator. The Deputy Administrator provides overall policy direction...

  3. 48 CFR 702.170-2 - Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Administrator. 702.170-2... DEFINITIONS OF WORDS AND TERMS Definitions 702.170-2 Administrator. Administrator means the Administrator or Deputy Administrator of the U.S. Agency for International Development....

  4. 48 CFR 702.170-2 - Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Administrator. 702.170-2... DEFINITIONS OF WORDS AND TERMS Definitions 702.170-2 Administrator. Administrator means the Administrator or Deputy Administrator of the U.S. Agency for International Development....

  5. 7 CFR 1700.26 - Deputy Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Deputy Administrator. 1700.26 Section 1700.26... AGRICULTURE GENERAL INFORMATION Agency Organization and Functions § 1700.26 Deputy Administrator. The Deputy Administrator aids and assists the Administrator. The Deputy Administrator provides overall policy direction...

  6. 48 CFR 702.170-2 - Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Administrator. 702.170-2... DEFINITIONS OF WORDS AND TERMS Definitions 702.170-2 Administrator. Administrator means the Administrator or Deputy Administrator of the U.S. Agency for International Development....

  7. 12 CFR 1075.102 - Fund administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 9 2014-01-01 2014-01-01 false Fund administrator. 1075.102 Section 1075.102... § 1075.102 Fund administrator. (a) In general. There is established the position of Civil Penalty Fund Administrator (Fund Administrator). The Fund Administrator will report to the Chief Financial Officer. The...

  8. 48 CFR 702.170-2 - Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Administrator. 702.170-2... DEFINITIONS OF WORDS AND TERMS Definitions 702.170-2 Administrator. Administrator means the Administrator or Deputy Administrator of the U.S. Agency for International Development....

  9. 5 CFR 534.604 - Pay administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Pay administration. 534.604 Section 534.604 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY UNDER OTHER SYSTEMS Pay for Administrative Appeals Judge Positions § 534.604 Pay administration. (a) The head of each agency must fix the rate of basic pay...

  10. 5 CFR 534.604 - Pay administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Pay administration. 534.604 Section 534.604 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY UNDER OTHER SYSTEMS Pay for Administrative Appeals Judge Positions § 534.604 Pay administration. (a) The head of each agency must fix the rate of basic pay...

  11. 5 CFR 534.604 - Pay administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Pay administration. 534.604 Section 534.604 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY UNDER OTHER SYSTEMS Pay for Administrative Appeals Judge Positions § 534.604 Pay administration. (a) The head of each agency must fix the rate of basic pay...

  12. 5 CFR 831.101 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Administration. 831.101 Section 831.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Administration and General Provisions § 831.101 Administration. (a) OPM has charge of...

  13. 7 CFR 56.3 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Administration. 56.3 Section 56.3 Agriculture... EGGS Grading of Shell Eggs General § 56.3 Administration. The Administrator shall perform, for and... administration of the provisions of the Act and the regulations in this part. The Administrator is authorized...

  14. 7 CFR 56.3 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Administration. 56.3 Section 56.3 Agriculture... EGGS Grading of Shell Eggs General § 56.3 Administration. The Administrator shall perform, for and... administration of the provisions of the Act and the regulations in this part. The Administrator is authorized...

  15. 5 CFR 831.101 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Administration. 831.101 Section 831.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Administration and General Provisions § 831.101 Administration. (a) OPM has charge of...

  16. 7 CFR 56.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Administration. 56.3 Section 56.3 Agriculture... EGGS Grading of Shell Eggs General § 56.3 Administration. The Administrator shall perform, for and... administration of the provisions of the Act and the regulations in this part. The Administrator is authorized...

  17. 7 CFR 56.3 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Administration. 56.3 Section 56.3 Agriculture... EGGS Grading of Shell Eggs General § 56.3 Administration. The Administrator shall perform, for and... administration of the provisions of the Act and the regulations in this part. The Administrator is authorized...

  18. 5 CFR 831.101 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Administration. 831.101 Section 831.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Administration and General Provisions § 831.101 Administration. (a) OPM has charge of...

  19. Administration of Occupational Education: A Suggested Guide.

    ERIC Educational Resources Information Center

    Valentine, Ivan E.

    Designed to provide administrators of occupation programs at the secondary and post-secondary level with a systems approach to administration, this administrators' guide brings together administrative and leadership tasks and responsibilities that must be considered by administrators when developing programs. The system presented in the guide is…

  20. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 9 2011-01-01 2011-01-01 false Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  1. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 9 2012-01-01 2012-01-01 false Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  2. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 9 2014-01-01 2013-01-01 true Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  3. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 9 2013-01-01 2013-01-01 false Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  4. 45 CFR 74.47 - Contract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contract administration. 74.47 Section 74.47 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE... administration. A system for contract administration shall be maintained to ensure contractor conformance...

  5. [Alternative routes for insulin administration].

    PubMed

    Lassmann-Vague, V

    1994-01-01

    Ideally, insulin administration should be done through portal route, with a precise kinetic. It should also lead to a reproducible biologic effect, with minimal side-effects and be acceptable for the majority of diabetic patients. Many alternative routes of insulin administration try to fulfill one or more of these criteria. Intraperitoneal route is already used with implantable pumps. It has proven safety and metabolic efficacy, particularly upon the reduction of severe hypoglycaemia. Nasal route could provide a rapid kinetic, but its long-term utilisation depends on improvement of bioavailability and studies of local toxicity. Results concerning intrabronchic insulin seem promising, but are still preliminary. In the future, the choice among these alternative routes of insulin administration will be guided by the development of a closed-loop system. PMID:8001707

  6. Administrative Evaluation. Administrator's Update. Volume 1, Number 1.

    ERIC Educational Resources Information Center

    Winschel, Carolyn

    Literature relevant to administrative evaluation in higher education was surveyed. Reasons for the increasing importance of this type of evaluation, approaches to and components of an evaluation plan, some of the problems involved in the evaluation process, and use of results are discussed. The current literature indicates that increased presure…

  7. TWRS information locator database system administrator`s manual

    SciTech Connect

    Knutson, B.J., Westinghouse Hanford

    1996-09-13

    This document is a guide for use by the Tank Waste Remediation System (TWRS) Information Locator Database (ILD) System Administrator. The TWRS ILD System is an inventory of information used in the TWRS Systems Engineering process to represent the TWRS Technical Baseline. The inventory is maintained in the form of a relational database developed in Paradox 4.5.

  8. Leadership with Administration: Securing Administrative Support for Transforming Your Program

    ERIC Educational Resources Information Center

    Saginak, Kelli A.; Dollarhide, Colette T.

    2006-01-01

    This article provides school counselors with a plan for securing administrative support for implementing of comprehensive school counseling programs. Systems and systems theory is introduced to explain systemic change in the context of leadership. Leadership theory is presented to assist school counselors in leading systemic change and securing…

  9. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  10. 78 FR 9771 - Federal Highway Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois and Indiana AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on..., Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone: (217)...

  11. 76 FR 5212 - Employment and Training Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Employment and Training Administration Comment Request for Information Collection for Internal Fraud and...: Employment and Training Administration (ETA), Department of Labor. ACTION: Notice. SUMMARY: The Department of.... Currently, the Employment and Training Administration is soliciting comments concerning the Office...

  12. 75 FR 12809 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ... Federal Aviation Administration Notice of Intent To Rule on Request To Release Airport Property at the Dallas/Fort Worth International Airport, DFW Airport, Texas AGENCY: Federal Aviation Administration (FAA... Aviation Administration, Southwest Region, Airports Division, Texas Airports Development Office,...

  13. 76 FR 78966 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Federal Aviation Administration Approval of Noise Compatibility Program for Kona International Airport at Keahole, Keahole, North Kona, HI AGENCY: Federal Aviation Administration, DOT. ACTION: Notice. SUMMARY: The Federal Aviation Administration (FAA) announces its findings on the noise compatibility...

  14. Values and Decision Making in Educational Administration.

    ERIC Educational Resources Information Center

    Lakomski, Gabriele

    1987-01-01

    Argues against the current trends in giving importance to subjective values in educational administration, particularly the argument that attention to subjective values can overcome the perceived irrelevance of scientific administration and organization theory and help administrators make better decisions. (MD)

  15. A Basic Manual for Physical Plant Administration.

    ERIC Educational Resources Information Center

    Weber, George O., Ed.; Fincham, Michael W., Ed.

    This book provides practical advice on problems of institutional plant management to physical plant administrators. Areas covered include the role, organization, and facilities of the physical plant department; personnel administration; financial administration; buildings maintenance and operation; custodial services; utilities distribution…

  16. Evaluating Administrative/Supervisory Performance.

    ERIC Educational Resources Information Center

    Educational Research Service, Arlington, VA.

    This is a report on the third survey conducted on procedures for evaluating the performance of administrators and supervisors in local school systems. A questionnaire was sent to school systems enrolling 25,000 or more pupils, and results indicated that 84 of the 154 responding systems have formal evaluation procedures. Tables and discussions of…

  17. The Administrative Team, Trust & Gender.

    ERIC Educational Resources Information Center

    Garfinkel, Elliot Z.

    This paper describes the first phase of a research study that examined (1) how superintendents define and select their administrative teams; (2) how team values are conceptualized by superintendents; (3) how "trust" is defined and its value perceived by superintendents; and (4) whether or not gender influences the way superintendents define "team"…

  18. Novel Approaches to Surfactant Administration

    PubMed Central

    Gupta, Samir; Donn, Steven M.

    2012-01-01

    Surfactant replacement therapy has been the mainstay of treatment for preterm infants with respiratory distress syndrome for more than twenty years. For the most part, surfactant is administered intratracheally, followed by mechanical ventilation. In recent years, the growing interest in noninvasive ventilation has led to novel approaches of administration. This paper will review these techniques and the associated clinical evidence. PMID:23243504

  19. Administrative Leadership in Organised Anarchies.

    ERIC Educational Resources Information Center

    Enderud, Harald

    1980-01-01

    An alternative conceptual framework to the traditional hierarchical bureaucratic picture of organizations is the "organized anarchy." How collective decisions are made, what university administrators can do to influence the input, process, and outcome of anarchic decision making, and points of leverage are discussed. (Author/MLW)

  20. Keys to Successful Systems Administration.

    ERIC Educational Resources Information Center

    Akins, M. L.; Griffin, J. R.

    1999-01-01

    Presents the main ingredients for successful computer-systems administration. Discusses training and ongoing support, change management for system upgrades, developing a problem-reporting form and keeping the documentation history, managing technical support, and having a disaster-recovery plan. (AEF)

  1. Fighting Fires in Educational Administration.

    ERIC Educational Resources Information Center

    Weick, Karl E.

    1996-01-01

    Recent research on wildland fire fighting supports educational administrators' use of the fire-fighting metaphor to describe the nature of their work. Fire-fighting nuances illuminate subtle conditions in educational organizations that increase their vulnerability to failure. These parallels suggest five management conditions that determine…

  2. Project REACH Administrator's Manual. PRAM.

    ERIC Educational Resources Information Center

    Piuma, Chesca; And Others

    The final volume in a series on Project REACH (Regular Education for All Children with Handicaps) is addressed to administrators involved in integrating severely disabled students into regular public schools. The manual is intended as a trouble-shooting tool with information on background theories and specific strategies. An introductory chapter…

  3. Administrator's Memo: Youth Tutoring Youth.

    ERIC Educational Resources Information Center

    National Commission on Resources for Youth, Inc., New York, NY.

    This manual, designed for the use of administrators in implementing a Youth Tutoring Youth Program (developed to encourage positive attitudes in tutors towards going to school, holding jobs, and helping others), outlines the employment of underachieving, disadvantaged 14- and 15-year-old Neighborhood Youth Corps enrollees as tutors for elementary…

  4. Administration and the Territorial Imperative.

    ERIC Educational Resources Information Center

    Moser, Robert P.

    This paper explores some of the evidence relating similarities between lower animal behavior in defense of territory and administrative behavior in defense of position prerogative. The bureaucratic organization has a system of sanctions to penalize those who would infringe upon the territory of superordinates. Humans mark their domains by audio…

  5. Improving Administrative Efficiency through Technology.

    ERIC Educational Resources Information Center

    Porter, Dennis R.

    1993-01-01

    Key adult education management functions (planning, directing personnel, organizing work, staffing, and evaluating) can be enhanced through appropriate technologies. Of particular interest to administrators are computer-based communications, management information systems, and desktop application software such as spreadsheets, groupware, and…

  6. The New Spirit in Administration.

    ERIC Educational Resources Information Center

    Razor, Jack E.

    This paper examines seven specific areas of concern for the administrator of a college physical education department. These major concerns are identified and discussed: (1) financial accountability; (2) staffing patterns; (3) unions in higher education; (4) assessment of staff and program; (5) promotion and tenure; (6) legal aspects of off-campus…

  7. Meaningful Written Communication by Administrators

    ERIC Educational Resources Information Center

    Keil, Virginia L.; McConnahan, Wendell R.

    2006-01-01

    Fifty-eight principals participated in this pilot study designed to examine the nature of school administrators' current practices in written communication. Work samples were examined against ISLLC standards that call for competency in facilitating vision, communicating culture and instruction, managing the organization, developing collaboration…

  8. Preparing Future Administrators: Stakeholder Perceptions.

    ERIC Educational Resources Information Center

    Bartell, Carol A.

    It is widely acknowledged that programs to prepare administrators for their roles are inadequate and are not designed with coming changes in education in mind. States must take responsibility for changing preparation programs to meet these challenges. Much of the discussion about preparation programs centers on the knowledge base administrators…

  9. RARE II: The Administration's View

    ERIC Educational Resources Information Center

    Cutler, M. Rupert

    1977-01-01

    RARE II is a new Roadless Area Review and Evaluation of the National Forest system. Administrators are attempting to inventory existing wilderness areas and to determine criteria for setting aside additional ones. This information will be used for the required 1980 update of the national assessment of forests and rangelands. (MA)

  10. Research Administrators as Servant Leaders

    ERIC Educational Resources Information Center

    Waite, Joann

    2011-01-01

    Within the sponsored research support offices in departments at research institutions, non-profits, and undergraduate institutions, research administrators are often perceived as servant leaders by their own membership organizations and those who work with them. This perception is influenced by survey results focusing on character. Parolini (2004)…

  11. Writing Centers: Theory and Administration.

    ERIC Educational Resources Information Center

    Olson, Gary A., Ed.

    Prepared by writing center directors, the articles in this book examine the pedagogical theories of tutorial services and relate them to actual center practices. The 19 articles are arranged into three categories: writing center theory, writing center administration, and special concerns. Specific topics discussed in the articles include the…

  12. Women Administrators as Instructional Leaders

    ERIC Educational Resources Information Center

    Horner, Beth A.

    2013-01-01

    Women are under-represented in educational research and are much less likely to hold administrative positions than are men. This study, using the Liberal Feminist Theory and Structural Barrier Theory, proffers possible explanations for this phenomenon. Four women leaders were interviewed to gain insight into their instructional leadership…

  13. Transforming Administration in Academic Libraries.

    ERIC Educational Resources Information Center

    Honea, Sion M.

    1997-01-01

    Examines the traditional hierarchical administrative structure in academic libraries. Also analyzes some of its features, and questions specific principles of management in order to propose a more balanced organizational type based on organizational behavior and leadership that will best enable academic libraries to meet challenges. (PEN)

  14. Issues in Canadian Educational Administration.

    ERIC Educational Resources Information Center

    Williams, Thomas; Powell, Mava Jo

    Examining the challenges and responsibilities facing Canadian provincial and local boards of education, this paper focuses on economic, demographic, ideological, jurisdictional, and administrative problems. Both provincial and local school boards currently face increasing financial pressure as inflation soars and taxpayers demand fiscal restraint.…

  15. Distributed Access to Administrative Systems.

    ERIC Educational Resources Information Center

    Carson, Eugene

    1987-01-01

    Administrators, faculty, and staff should have electronic access to records needed to perform their jobs, and students should have access to their own records--course registration and addresses. User-directed analysis and reporting are discussed and the security and audit issues are examined. (Author/MLW)

  16. Reforming the Educational Administration Curriculum.

    ERIC Educational Resources Information Center

    Miklos, Erwin

    This paper discusses the conceptual reform of university-based graduate level administrator preparation programs. The functionalist, interpretative, and critical approaches to social science have important implications for the study of motivation, decision-making, communication and leadership. Interpretative and critical approaches must be woven…

  17. Alleviating Stress for Women Administrators.

    ERIC Educational Resources Information Center

    Ten Elshof, Annette; Tomlinson, Elaine

    1981-01-01

    Describes a workshop designed to help women administrators assess individual stress levels. Stress can be alleviated through exercise, support groups or networking, sleep and diet, relaxation, guided fantasy, and planned activity. The long-term implications include preventing illness and making women more effective within the administrative…

  18. View from the Administrator's Office.

    ERIC Educational Resources Information Center

    Shaub, Walter M.

    1999-01-01

    Discusses Environmental Protection Agency (EPA) administrator Carol Browner's views on facilitating practical approaches that address major environmental issues in the United States. Examines issues of helping local communities, climate impact and prevention, water quality and quantity, and the EPA's changing role in society. (WRM)

  19. Innovating Traditional Nursing Administration Challenges.

    PubMed

    Joseph, M Lindell; Fowler, Debra

    2016-03-01

    The evolving and complex practice environment calls for new mindsets among nurse leaders, academics, and nurse innovators to envision innovative ways to manage and optimize traditional tasks and processes in nursing administration. The purpose of this article is to present 3 case studies that used linear programming and simulation to innovate staffing enterprises, financial management of healthcare systems, and curricula development. PMID:26906516

  20. High-Stakes Administrative Hiring

    ERIC Educational Resources Information Center

    Clement, Mary C.

    2009-01-01

    The risks are high when it comes to hiring a new principal. A principal is accountable for the safety, well-being and achievement of all the children in a school, as well as for representing the school to the community. With increasing demands on building administrators, the hiring of principals certainly may be considered high stakes. For several…

  1. Software Solutions for Better Administration.

    ERIC Educational Resources Information Center

    Kazanjian, Edward

    1997-01-01

    The CO/OP (founded in 1973 as the Massachusetts Association of School Business Officials Cooperative Corporation) has created and produced administrative software for schools. Describes two areas in which software can increase revenue and provide protection for personnel: (1) invoice/accounts receivable for the rental of school space; and (2) an…

  2. DRUG ENFORCEMENT ADMINISTRATION REGISTRATION DATABASE

    EPA Science Inventory

    The Drug Enforcement Administration (DEA), as part of its efforts to control the abuse and misuse of controlled substances and chemicals used in producing some over-the-counter drugs, maintains databases of individuals registered to handle these substances. These databases are av...

  3. Administrative Utility Analysis: Study Summary.

    ERIC Educational Resources Information Center

    Peat, Marwick, Mitchell and Co., San Juan, Puerto Rico.

    This document summarizes the recommendations made as a result of a study on administrative utility analysis and vocational education programs for Puerto Rico. The major recommendation was that the Area of Vocational and Technical Education (AVTE) in the Puerto Rico Department of Education be restructured at the central organizational level, for…

  4. Teacher & Administrator Training in Technology.

    ERIC Educational Resources Information Center

    Ambron, Sueann, Ed.

    1986-01-01

    This report summarizes a November 1985 meeting at which members of the Apple Education Advisory Council addressed the issues involved in training teachers and administrators on the best ways to use computers in education. In their discussions, Advisory Council members first summarized the roles that are played by each type of organization involved…

  5. Financial Management in School Administration.

    ERIC Educational Resources Information Center

    Tronc, Keith, Ed.

    Because Australian school principals are being given increasing autonomy, knowledge of basic accounting principles and skill in elementary financial management are becoming more necessary. This book attempts to supply school administrators with information needed to handle new accounting duties and to lay a foundation for future fuller involvement…

  6. Instructional Technology and Administrative Decisions

    ERIC Educational Resources Information Center

    Eye, Glen G.; and others

    1969-01-01

    "Concerned with the spiraling problems of technology and its impact on instruction, the American Association of School Administrators (AASA) two years ago created the Committee on Technology and Instruction. Since that time the Committee has been active in investigating a number of areas relevant to the impact of technology on the public schools. …

  7. Administrative Support Occupations Skill Standards.

    ERIC Educational Resources Information Center

    Professional Secretaries International, Kansas City, MO.

    This document establishes a set of performance expectations based on current practices in administrative support occupations. It is designed to assist individuals, training providers, employers, management personnel, and professional organizations in matching knowledge, abilities, and interests to knowledge and skills required for success in…

  8. CONTRACT ADMINISTRATIVE TRACKING SYSTEM (CATS)

    EPA Science Inventory

    The Contract Administrative Tracking System (CATS) was developed in response to an ORD NHEERL, Mid-Continent Ecology Division (MED)-recognized need for an automated tracking and retrieval system for Cost Reimbursable Level of Effort (CR/LOE) Contracts. CATS is an Oracle-based app...

  9. The Administration's Private Pension Proposal.

    ERIC Educational Resources Information Center

    American Enterprise Inst. for Public Policy Research, Washington, DC.

    This report examines legislation proposed by the Nixon administration to (1) make available to employed workers a new type of personal retirement plan having tax-deferral advantages, (2) apply pre-retirement vesting requirements to the private pension system, and (3) broaden tax-deferred retirement plans presently available to the self-employed…

  10. 7 CFR 3431.20 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the Veterinary Medicine Loan Repayment Program § 3431.20 Administration. The VMLRP will be administered by...

  11. 28 CFR 36.204 - Administrative methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Administrative methods. 36.204 Section 36... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES General Requirements § 36.204 Administrative methods... standards or criteria or methods of administration that have the effect of discriminating on the basis...

  12. Public School Administrators: Components of Burnout.

    ERIC Educational Resources Information Center

    Wax, Anne S.; Hales, Loyde W.

    The objectives of this study of public school administrators were to determine the level of burnout experienced by school administrators, the relationships between burnout and stress measures, the factors associated with burnout, and the relationships between administrative level and components of the Administrative Role Perception Inventory…

  13. 24 CFR 982.54 - Administrative plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Administrative plan. 982.54 Section... SECTION 8 TENANT-BASED ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM HUD Requirements and PHA Plan for Administration of Program § 982.54 Administrative plan. (a) The PHA must adopt a written administrative plan...

  14. 19 CFR 145.21 - Administrative review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Administrative review. 145.21 Section 145.21... TREASURY (CONTINUED) MAIL IMPORTATIONS Administrative Review of Mail Entries § 145.21 Administrative review... administrative review in accordance with this subpart....

  15. 42 CFR 405.1875 - Administrator review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Administrator review. 405.1875 Section 405.1875... Appeals § 405.1875 Administrator review. (a) Basic rule: Time limit for rendering Administrator decisions, Board decisions, and action subject to immediate review. The Administrator, at his or her...

  16. 19 CFR 145.21 - Administrative review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 2 2013-04-01 2013-04-01 false Administrative review. 145.21 Section 145.21... TREASURY (CONTINUED) MAIL IMPORTATIONS Administrative Review of Mail Entries § 145.21 Administrative review... administrative review in accordance with this subpart....

  17. 42 CFR 401.148 - Administrative review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Administrative review. 401.148 Section 401.148... PROVISIONS GENERAL ADMINISTRATIVE REQUIREMENTS Confidentiality and Disclosure § 401.148 Administrative review. (a) Review by the Administrator. A person whose request has been denied may initiate a review...

  18. 19 CFR 145.21 - Administrative review.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 2 2011-04-01 2011-04-01 false Administrative review. 145.21 Section 145.21... TREASURY (CONTINUED) MAIL IMPORTATIONS Administrative Review of Mail Entries § 145.21 Administrative review... administrative review in accordance with this subpart....

  19. 24 CFR 583.135 - Administrative costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Administrative costs. 583.135... Administrative costs. (a) General. Up to five percent of any grant awarded under this part may be used for the purpose of paying costs of administering the assistance. (b) Administrative costs. Administrative...

  20. 40 CFR 142.24 - Administrator's rescission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Administrator's rescission. 142.24... Exemptions § 142.24 Administrator's rescission. If, upon notification of a finding by the Administrator under... revised schedule, the Administrator shall rescind the application of his finding to that...

  1. 7 CFR 1230.603 - Administrator, FSA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, FSA. 1230.603 Section 1230.603... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.603 Administrator, FSA. The term Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer...

  2. 7 CFR 62.100 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Administrator. 62.100 Section 62.100 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Definitions Administration § 62.100 Administrator. The LS Program Deputy Administrator is charged with...

  3. 42 CFR 405.1875 - Administrator review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Administrator review. 405.1875 Section 405.1875... Appeals § 405.1875 Administrator review. (a) Basic rule: Time limit for rendering Administrator decisions, Board decisions, and action subject to immediate review. The Administrator, at his or her...

  4. 7 CFR 1280.603 - Administrator, FSA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, FSA. 1280.603 Section 1280.603... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.603 Administrator, FSA. Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer or employee of USDA to...

  5. 7 CFR 1280.602 - Administrator, AMS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, AMS. 1280.602 Section 1280.602... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.602 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee of...

  6. 7 CFR 800.2 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appear at part 68 of this title (7 CFR part 68). The Administrator is authorized by the Secretary to take... 7 Agriculture 7 2010-01-01 2010-01-01 false Administrator. 800.2 Section 800.2 Agriculture... § 800.2 Administrator. The Administrator is delegated, from the Secretary, responsibility...

  7. 7 CFR 1230.602 - Administrator, AMS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, AMS. 1230.602 Section 1230.602... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.602 Administrator, AMS. The term Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or...

  8. 7 CFR 201.3 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Administrator. 201.3 Section 201.3 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... REGULATIONS Administration § 201.3 Administrator. The Administrator of the Agricultural Marketing Service...

  9. 7 CFR 1205.11 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator. 1205.11 Section 1205.11 Agriculture... Procedures for Conduct of Sign-up Period Definitions § 1205.11 Administrator. The term Administrator means the Administrator of the Agricultural Marketing Service, or any officer or employee of USDA to...

  10. 7 CFR 868.5 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Administrator. 868.5 Section 868.5 Agriculture... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Administration § 868.5 Administrator. The Administrator, under the authority delegated by the Secretary, is charged with administering the programs...

  11. 21 CFR 800.55 - Administrative detention.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Administrative detention. 800.55 Section 800.55...) MEDICAL DEVICES GENERAL Administrative Practices and Procedures § 800.55 Administrative detention. (a... believed to be adulterated or misbranded. Administrative detention is intended to protect the public...

  12. 18 CFR 415.40 - Administrative agency.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Administrative agency. 415.40 Section 415.40 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-FLOOD PLAIN REGULATIONS Administration § 415.40 Administrative agency....

  13. 7 CFR 1221.201 - Administrator, AMS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator, AMS. 1221.201 Section 1221.201... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.201 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee...

  14. 7 CFR 1230.603 - Administrator, FSA.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Administrator, FSA. 1230.603 Section 1230.603... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.603 Administrator, FSA. The term Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer...

  15. 7 CFR 800.2 - Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... appear at part 68 of this title (7 CFR part 68). The Administrator is authorized by the Secretary to take... 7 Agriculture 7 2013-01-01 2013-01-01 false Administrator. 800.2 Section 800.2 Agriculture... § 800.2 Administrator. The Administrator is delegated, from the Secretary, responsibility...

  16. 42 CFR 405.1875 - Administrator review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 2 2013-10-01 2013-10-01 false Administrator review. 405.1875 Section 405.1875... Appeals § 405.1875 Administrator review. (a) Basic rule: Time limit for rendering Administrator decisions, Board decisions, and action subject to immediate review. The Administrator, at his or her...

  17. 7 CFR 62.100 - Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Administrator. 62.100 Section 62.100 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Definitions Administration § 62.100 Administrator. The LS Program Deputy Administrator is charged with...

  18. 7 CFR 1230.603 - Administrator, FSA.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator, FSA. 1230.603 Section 1230.603... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.603 Administrator, FSA. The term Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer...

  19. 7 CFR 800.2 - Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... appear at part 68 of this title (7 CFR part 68). The Administrator is authorized by the Secretary to take... 7 Agriculture 7 2011-01-01 2011-01-01 false Administrator. 800.2 Section 800.2 Agriculture... § 800.2 Administrator. The Administrator is delegated, from the Secretary, responsibility...

  20. 7 CFR 1221.202 - Administrator, FSA.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator, FSA. 1221.202 Section 1221.202... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.202 Administrator, FSA. Administrator, FSA, means the Administrator of the Farm Service Agency, or any officer or employee of USDA...

  1. 7 CFR 1280.603 - Administrator, FSA.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator, FSA. 1280.603 Section 1280.603... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.603 Administrator, FSA. Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer or employee of USDA to...

  2. 7 CFR 201.3 - Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Administrator. 201.3 Section 201.3 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... REGULATIONS Administration § 201.3 Administrator. The Administrator of the Agricultural Marketing Service...

  3. 7 CFR 800.2 - Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appear at part 68 of this title (7 CFR part 68). The Administrator is authorized by the Secretary to take... 7 Agriculture 7 2012-01-01 2012-01-01 false Administrator. 800.2 Section 800.2 Agriculture... § 800.2 Administrator. The Administrator is delegated, from the Secretary, responsibility...

  4. 7 CFR 1221.201 - Administrator, AMS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator, AMS. 1221.201 Section 1221.201... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.201 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee...

  5. 7 CFR 62.100 - Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Administrator. 62.100 Section 62.100 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Definitions Administration § 62.100 Administrator. The LS Program Deputy Administrator is charged with...

  6. 7 CFR 201.3 - Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Administrator. 201.3 Section 201.3 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... REGULATIONS Administration § 201.3 Administrator. The Administrator of the Agricultural Marketing Service...

  7. 7 CFR 868.5 - Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Administrator. 868.5 Section 868.5 Agriculture... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Administration § 868.5 Administrator. The Administrator, under the authority delegated by the Secretary, is charged with administering the programs...

  8. 42 CFR 405.1875 - Administrator review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 2 2011-10-01 2011-10-01 false Administrator review. 405.1875 Section 405.1875... Appeals § 405.1875 Administrator review. (a) Basic rule: Time limit for rendering Administrator decisions, Board decisions, and action subject to immediate review. The Administrator, at his or her...

  9. 7 CFR 1221.202 - Administrator, FSA.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Administrator, FSA. 1221.202 Section 1221.202... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.202 Administrator, FSA. Administrator, FSA, means the Administrator of the Farm Service Agency, or any officer or employee of USDA...

  10. 7 CFR 1205.11 - Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Administrator. 1205.11 Section 1205.11 Agriculture... Procedures for Conduct of Sign-up Period Definitions § 1205.11 Administrator. The term Administrator means the Administrator of the Agricultural Marketing Service, or any officer or employee of USDA to...

  11. 7 CFR 1221.202 - Administrator, FSA.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator, FSA. 1221.202 Section 1221.202... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.202 Administrator, FSA. Administrator, FSA, means the Administrator of the Farm Service Agency, or any officer or employee of USDA...

  12. 7 CFR 1280.603 - Administrator, FSA.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator, FSA. 1280.603 Section 1280.603... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.603 Administrator, FSA. Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer or employee of USDA to...

  13. 7 CFR 62.100 - Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Administrator. 62.100 Section 62.100 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Definitions Administration § 62.100 Administrator. The LS Program Deputy Administrator is charged with...

  14. 7 CFR 1230.602 - Administrator, AMS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Administrator, AMS. 1230.602 Section 1230.602... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.602 Administrator, AMS. The term Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or...

  15. 7 CFR 1280.602 - Administrator, AMS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator, AMS. 1280.602 Section 1280.602... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.602 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee of...

  16. 7 CFR 1230.602 - Administrator, AMS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator, AMS. 1230.602 Section 1230.602... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.602 Administrator, AMS. The term Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or...

  17. 7 CFR 62.100 - Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Administrator. 62.100 Section 62.100 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Definitions Administration § 62.100 Administrator. The LS Program Deputy Administrator is charged with...

  18. 7 CFR 1280.602 - Administrator, AMS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator, AMS. 1280.602 Section 1280.602... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.602 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee of...

  19. 7 CFR 1230.602 - Administrator, AMS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator, AMS. 1230.602 Section 1230.602... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.602 Administrator, AMS. The term Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or...

  20. 7 CFR 868.5 - Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Administrator. 868.5 Section 868.5 Agriculture... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Administration § 868.5 Administrator. The Administrator, under the authority delegated by the Secretary, is charged with administering the programs...

  1. 42 CFR 405.1875 - Administrator review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 2 2012-10-01 2012-10-01 false Administrator review. 405.1875 Section 405.1875... Appeals § 405.1875 Administrator review. (a) Basic rule: Time limit for rendering Administrator decisions, Board decisions, and action subject to immediate review. The Administrator, at his or her...

  2. 7 CFR 800.2 - Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... appear at part 68 of this title (7 CFR part 68). The Administrator is authorized by the Secretary to take... 7 Agriculture 7 2014-01-01 2014-01-01 false Administrator. 800.2 Section 800.2 Agriculture... § 800.2 Administrator. The Administrator is delegated, from the Secretary, responsibility...

  3. 7 CFR 1230.602 - Administrator, AMS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator, AMS. 1230.602 Section 1230.602... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.602 Administrator, AMS. The term Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or...

  4. 7 CFR 1205.11 - Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator. 1205.11 Section 1205.11 Agriculture... Procedures for Conduct of Sign-up Period Definitions § 1205.11 Administrator. The term Administrator means the Administrator of the Agricultural Marketing Service, or any officer or employee of USDA to...

  5. 7 CFR 1280.602 - Administrator, AMS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator, AMS. 1280.602 Section 1280.602... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.602 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee of...

  6. 7 CFR 201.3 - Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Administrator. 201.3 Section 201.3 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... REGULATIONS Administration § 201.3 Administrator. The Administrator of the Agricultural Marketing Service...

  7. 40 CFR 142.24 - Administrator's rescission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Administrator's rescission. 142.24... Exemptions § 142.24 Administrator's rescission. If, upon notification of a finding by the Administrator under... revised schedule, the Administrator shall rescind the application of his finding to that...

  8. 7 CFR 1205.11 - Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator. 1205.11 Section 1205.11 Agriculture... Procedures for Conduct of Sign-up Period Definitions § 1205.11 Administrator. The term Administrator means the Administrator of the Agricultural Marketing Service, or any officer or employee of USDA to...

  9. 7 CFR 1221.201 - Administrator, AMS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator, AMS. 1221.201 Section 1221.201... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.201 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee...

  10. 7 CFR 1205.11 - Administrator.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator. 1205.11 Section 1205.11 Agriculture... Procedures for Conduct of Sign-up Period Definitions § 1205.11 Administrator. The term Administrator means the Administrator of the Agricultural Marketing Service, or any officer or employee of USDA to...

  11. 7 CFR 1230.603 - Administrator, FSA.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator, FSA. 1230.603 Section 1230.603... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.603 Administrator, FSA. The term Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer...

  12. 40 CFR 142.24 - Administrator's rescission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Administrator's rescission. 142.24... Exemptions § 142.24 Administrator's rescission. If, upon notification of a finding by the Administrator under... revised schedule, the Administrator shall rescind the application of his finding to that...

  13. 7 CFR 1221.202 - Administrator, FSA.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Administrator, FSA. 1221.202 Section 1221.202... INFORMATION ORDER Procedures for the Conduct of Referenda Definitions § 1221.202 Administrator, FSA. Administrator, FSA, means the Administrator of the Farm Service Agency, or any officer or employee of USDA...

  14. 7 CFR 201.3 - Administrator.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Administrator. 201.3 Section 201.3 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... REGULATIONS Administration § 201.3 Administrator. The Administrator of the Agricultural Marketing Service...

  15. 7 CFR 1280.603 - Administrator, FSA.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Administrator, FSA. 1280.603 Section 1280.603... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.603 Administrator, FSA. Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer or employee of USDA to...

  16. 7 CFR 868.5 - Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Administrator. 868.5 Section 868.5 Agriculture... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Administration § 868.5 Administrator. The Administrator, under the authority delegated by the Secretary, is charged with administering the programs...

  17. 7 CFR 1280.602 - Administrator, AMS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Administrator, AMS. 1280.602 Section 1280.602... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.602 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee of...

  18. 7 CFR 1230.603 - Administrator, FSA.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Administrator, FSA. 1230.603 Section 1230.603... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.603 Administrator, FSA. The term Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer...

  19. 7 CFR 868.5 - Administrator.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 7 2013-01-01 2013-01-01 false Administrator. 868.5 Section 868.5 Agriculture... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Administration § 868.5 Administrator. The Administrator, under the authority delegated by the Secretary, is charged with administering the programs...

  20. 7 CFR 1280.603 - Administrator, FSA.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Administrator, FSA. 1280.603 Section 1280.603... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.603 Administrator, FSA. Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer or employee of USDA to...