Science.gov

Sample records for administration burley substation

  1. 7. VIEW SHOWING SOUTH SIDE OF BURLEY SUBSTATION WITH DRYCLEANERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW SHOWING SOUTH SIDE OF BURLEY SUBSTATION WITH DRYCLEANERS IN FOREGROUND AND SIDE OF SUBSTATION WITH BREAK BETWEEN 1913-1914 AND 1921 CONSTRUCTION PHASES IN BACKGROUND - Bonneville Power Administration Burley Substation, 1221 Albion Avenue, Burley, Cassia County, ID

  2. 11. INTERIOR VIEW OF BURLEY SUBSTATION, SECOND STORY, LOOKING EAST, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR VIEW OF BURLEY SUBSTATION, SECOND STORY, LOOKING EAST, SHOWING PARTITIONS, POURED-IN-PLACE CONCRETE ROOF AND WATER- DAMAGED SOUTH WALL (BREAK BETWEEN 1913-1914 AND 1921 CONSTRUCTION PHASES IN FOREGROUND) - Bonneville Power Administration Burley Substation, 1221 Albion Avenue, Burley, Cassia County, ID

  3. 3. VIEW SHOWING FRONT HALF OF NORTH SIDE OF BURLEY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW SHOWING FRONT HALF OF NORTH SIDE OF BURLEY SUBSTATION, LOOKING SOUTHWEST. BREAK BETWEEN 1913-1914 AND 1921 CONSTRUCTION PHASES, LOCATED BELOW AND ABOVE RIGHT EDGE OF SECOND WINDOW, FRONT LEFT OF PHOTOGRAPH - Bonneville Power Administration Burley Substation, 1221 Albion Avenue, Burley, Cassia County, ID

  4. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  5. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  6. 3. Photocopy of photograph ('Town and Community Planning, Walter Burley ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photocopy of photograph ('Town and Community Planning, Walter Burley Griffin,' Western Architect, Vol. 19, No. 8, August, 1913, following page 80) ca 1913 MAIN FACADE AND GARAGE FACADE - Arthur L. Rule House, 11 South Rock Glen, Mason City, Cerro Gordo County, IA

  7. Wolf Point Substation, Roosevelt County, Montana

    SciTech Connect

    Not Available

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

  8. 20 CFR 631.82 - Substate allocation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Substate allocation. 631.82 Section 631.82 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB TRAINING PARTNERSHIP ACT Disaster Relief Employment Assistance § 631.82 Substate...

  9. Substation fire protection features

    SciTech Connect

    Hausheer, T.G.

    1995-10-01

    This paper describes Commonwealth Edison`s (ComEd) approach to substation fire protection. Substation fires can have a major operational, financial, as well as political impact on a utility. The overall Company philosophy encompasses both active and passive fire protection features to provide prompt detection, notification, and confinement of fire and its by-products. Conservatively designed smoke detection systems and floor and wall penetration seals form the backbone of this strategy. The Company has implemented a program to install these features in new and existing substations. Thus far these measures have been successful in mitigating the consequences of substation fires.

  10. 20. Photocopy of photograph showing the completed South Bank Substation, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of photograph showing the completed South Bank Substation, 4 November 1939 (from the BPA Photo Archives, Negative No. 6556), LOOKING NORTHWEST WITH THE BONNEVILLE DAM POWERHOUSE AND TRANSMISSION TOWERS IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  11. 17. Photocopy of photograph showing excavation of South Bank Substation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of photograph showing excavation of South Bank Substation site, 15 May 1939 (from the BPA Photo Archives, Portland, Oregon, Negative No. 345), LOOKING WEST - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  12. 20 CFR 631.51 - Allowable substate program activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Allowable substate program activities. 631.51 Section 631.51 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.51 Allowable...

  13. 20 CFR 631.51 - Allowable substate program activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Allowable substate program activities. 631.51 Section 631.51 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.51 Allowable...

  14. 7 CFR 29.75a - Display of burley tobacco on auction warehouse floors in designated markets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Display of burley tobacco on auction warehouse floors... COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS TOBACCO INSPECTION Regulations Mandatory Inspection § 29.75a Display of burley tobacco on auction warehouse floors in designated markets. (a)(1) Each...

  15. 7 CFR 29.75a - Display of burley tobacco on auction warehouse floors in designated markets.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Display of burley tobacco on auction warehouse floors... COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS TOBACCO INSPECTION Regulations Mandatory Inspection § 29.75a Display of burley tobacco on auction warehouse floors in designated markets. (a)(1) Each...

  16. 7 CFR 29.75a - Display of burley tobacco on auction warehouse floors in designated markets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Display of burley tobacco on auction warehouse floors... COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS TOBACCO INSPECTION Regulations Mandatory Inspection § 29.75a Display of burley tobacco on auction warehouse floors in designated markets. (a)(1) Each...

  17. PUREX new substation ATR

    SciTech Connect

    Nelson, D.E.

    1997-05-12

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.

  18. 30 CFR 77.811 - Movement of portable substations and transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of portable substations and transformers. 77.811 Section 77.811 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... and transformers. Portable substations and transformers shall be deenergized before they are...

  19. Scoping study: Substation design workstation

    SciTech Connect

    Mauser, S.F. ); Conroy, M.W. ); Singh, N.M. )

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  20. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  1. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  2. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Construction in energized substations. 1926.957 Section 1926.957 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission...

  3. A Quantitative Real-Time PCR-Based Strategy for Molecular Evaluation of Nicotine Conversion in Burley Tobacco.

    PubMed

    Sun, Bo; Xue, Sheng-Ling; Zhang, Fen; Luo, Zhao-Peng; Wu, Ming-Zhu; Chen, Qing; Tang, Hao-Ru; Lin, Fu-Cheng; Yang, Jun

    2015-11-17

    Nornicotine production in Nicotiana tabacum is undesirable because it is the precursor of the carcinogen N'-nitrosonornicotine. In some individual burley tobacco plants, a large proportion of the nicotine can be converted to nornicotine, and this process of nicotine conversion is mediated primarily by enzymatic N-demethylation of nicotine which is controlled mainly by CYP82E4. Here we report a novel strategy based on quantitative real-time polymerase chain reaction (qPCR) method, which analyzed the ratio of nicotine conversion through examining the transcript level of CYP82E4 in burley leaves and do not need ethylene induction before detected. The assay was linear in a range from 1 × 10¹ to 1 × 10⁵ copies/mL of serially diluted standards, and also showed high specificity and reproducibility (93%-99%). To assess its applicability, 55 plants of burley cultivar Ky8959 at leaf maturing stage were analyzed, and the results were in accordance with those from gas chromatograph-mass spectrometry (GC-MS) method. Moreover, a linear correlation existed between conversion level and CYP82E4 transcript abundance. Taken together, the quantitative real-time PCR assay is standardized, rapid and reproducible for estimation of nicotine conversion level in vivo, which is expected to shed new light on monitoring of burley tobacco converter.

  4. 20 CFR 631.50 - Substate plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Substate plan. 631.50 Section 631.50... THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.50 Substate plan. (a) In order to receive an... plan, in accordance with instructions issued by the Governor. Such plan shall meet the requirements...

  5. Determination of free amino acids in burley tobacco by high performance liquid chromatography.

    PubMed

    Jing, Yanqiu; Zhang, Baolin; Yuan, Xiuxiu; Gao, Yuzhen; Lu, Ping; Wang, Weifeng; Xu, Min

    2016-01-01

    A reversed-phase high performance liquid chromatographic method was developed for determining free amino acids in burley tobacco. The test was done by OPA/3-mercaptopropionic acid as the pre-column derivatizing reagent. Chromatographic column was Elitte C(18) column (4.6 mm × 250 mm i.d., 5 μm). Mobile phase A was 18 mol/l NaAc (pH7.2) including 0.002%(v/v) triethylamine and 0.3%(v/v) furanidine. Mobile phase B was 100 mol/l NaAc (pH7.2)-acetonitrile-methanol (v/v = 1:2:2). The column temperature was 40 °C and the flow rate was 1.0 ml/min. The fluorescence detector was used with 350 nm excitation wave length and 450 nm emission wave length. The average recoveries of the method ranged from 95.3-100.7% with the relative standard deviation of 2.32-9.24%. The method is simple, accurate and has good repeatability. The results of the determination of seventeen kinds of free amino acids in burley leaves were produced by the way of different ratios of cake fertilizer and inorganic fertilizer. The results show that Aspartic acid has the highest content however ratio of cake fertilizer and inorganic fertilizer. The contents of most of the free amino acids are increased and then gradually decreased with the increase in organic manure. The contents of most of the free amino acids are very close at 15:85% ratio and 30:70% ratio of cake fertilizer and inorganic fertilizer. The total amount of free amino acids is the highest at 30:70% ratio of cake fertilizer and inorganic fertilizer. Considering comprehensively, the quality of burley leaves is the best at 30:70% ratio of cake fertilizer and inorganic fertilizer.

  6. Determination of free amino acids in burley tobacco by high performance liquid chromatography

    PubMed Central

    Jing, Yanqiu; Zhang, Baolin; Yuan, Xiuxiu; Gao, Yuzhen; Lu, Ping; Wang, Weifeng; Xu, Min

    2015-01-01

    A reversed-phase high performance liquid chromatographic method was developed for determining free amino acids in burley tobacco. The test was done by OPA/3-mercaptopropionic acid as the pre-column derivatizing reagent. Chromatographic column was Elitte C18 column (4.6 mm × 250 mm i.d., 5 μm). Mobile phase A was 18 mol/l NaAc (pH7.2) including 0.002%(v/v) triethylamine and 0.3%(v/v) furanidine. Mobile phase B was 100 mol/l NaAc (pH7.2)–acetonitrile–methanol (v/v = 1:2:2). The column temperature was 40 °C and the flow rate was 1.0 ml/min. The fluorescence detector was used with 350 nm excitation wave length and 450 nm emission wave length. The average recoveries of the method ranged from 95.3–100.7% with the relative standard deviation of 2.32–9.24%. The method is simple, accurate and has good repeatability. The results of the determination of seventeen kinds of free amino acids in burley leaves were produced by the way of different ratios of cake fertilizer and inorganic fertilizer. The results show that Aspartic acid has the highest content however ratio of cake fertilizer and inorganic fertilizer. The contents of most of the free amino acids are increased and then gradually decreased with the increase in organic manure. The contents of most of the free amino acids are very close at 15:85% ratio and 30:70% ratio of cake fertilizer and inorganic fertilizer. The total amount of free amino acids is the highest at 30:70% ratio of cake fertilizer and inorganic fertilizer. Considering comprehensively, the quality of burley leaves is the best at 30:70% ratio of cake fertilizer and inorganic fertilizer. PMID:26858568

  7. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  8. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  9. 20 CFR 631.82 - Substate allocation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... THE JOB TRAINING PARTNERSHIP ACT Disaster Relief Employment Assistance § 631.82 Substate allocation..., within such disaster areas. The remainder of such funds may be reserved by the Governor for use, in... with such major disaster. (b) The JTPA title III program substate grantee for the disaster area...

  10. Experimental adoption of RCM in EDF substations

    SciTech Connect

    Heroin, G.; Aupied, J.; Sanchis, G.

    1996-08-01

    EDF, after testing Reliability Centered Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF`s policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment - frequency and seriousness - and two criteria for maintenance task selection - efficiency and facility. The final outcome of RCM as applied to substation maintenance is to categorize maintenance tasks into: (1) essential maintenance tasks, (2) optional tasks, depending on the type and location of the substation, as well as on factors relating to local management of maintenance policy, and (3) unnecessary tasks.

  11. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  12. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  13. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  14. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  15. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  16. Gas insulated substation equipment for industrial applications

    SciTech Connect

    Kenedy, J.J.

    1984-11-01

    Until recently the only available method for construction of high voltage systems was to use exposed air insulated equipment supported on porcelain columns. The past decade has witnessed the introduction and wide acceptance of compressed gas insulated equipment as a viable alternative to the conventional substation system. The characteristics of gas insulated substations (GIS) and their application for industrial use at service voltages at 69 kV and above are discussed.

  17. Scoping study: Substation design workstation. Final report

    SciTech Connect

    Mauser, S.F.; Conroy, M.W.; Singh, N.M.

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  18. 30 CFR 77.811 - Movement of portable substations and transformers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Movement of portable substations and transformers. 77.811 Section 77.811 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface...

  19. View of EPA Farm power substation, facing westsouthwest Nevada ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of EPA Farm power substation, facing west-southwest - Nevada Test Site, Environmental Protection Agency Farm, Power Substation, Area 15, Yucca Flat, 10-2 Road near Circle Road, Mercury, Nye County, NV

  20. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Substation and transmission line construction. 1726... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Substation and Transmission Facilities § 1726.77 Substation and transmission line construction. (a)...

  1. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  2. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  3. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  4. 7 CFR 1726.77 - Substation and transmission line construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Substation and transmission line construction. 1726... and Transmission Facilities § 1726.77 Substation and transmission line construction. (a) Contract... substation and transmission line construction (including minor modifications or improvements), exclusive...

  5. Using Immersive Virtual Reality for Electrical Substation Training

    ERIC Educational Resources Information Center

    Tanaka, Eduardo H.; Paludo, Juliana A.; Cordeiro, Carlúcio S.; Domingues, Leonardo R.; Gadbem, Edgar V.; Euflausino, Adriana

    2015-01-01

    Usually, distribution electricians are called upon to solve technical problems found in electrical substations. In this project, we apply problem-based learning to a training program for electricians, with the help of a virtual reality environment that simulates a real substation. Using this virtual substation, users may safely practice maneuvers…

  6. Dimensioning of nearby substations interconnected ground system

    SciTech Connect

    Sobral, S.T. ); Costa, V.S. ); Campos, M.S.; Goldman, B. ); Mukhedkar, D. )

    1988-10-01

    This paper deals with the ground mat dimensioning of two or more neighbor interconnected substations, a situation that is very common in the Electrical Industry. The paper recalls that the external ground circuits connected to the ground grid of each substation can drastically reduce the percentage of total ground current injected into the soil through the mat (from 40% up to 2% of the total fault current). The paper presents a set of specific calculation procedures to deal with nearby interconnected ground mats. These procedures correspond to a particular illustration of the general ''Decoupled Method'' (3,4,5), showing how to apply its 8 sequencial steps to solve this type of circuit. The paper shows that the electric neighborhood of nearby substations depends on the ''Space Constant'' (or ''Characteristic Length'') of the ground circuits interconnecting them such as transmission line ground-wires, power cable sheaths, etc. This paper complements also Ref. (3,4), introducing the complete derivation of useful expressions used to solve lumped parameter ladder circuits of any size (from one pi to an infinite number of pis). The derivation of these expressions also used in (3,4) were not included in these References due to lack of space. In the paper it is also shown a simple procedure to determine the suitable number of ACSR ground-wire spans near a substation necessary to allow a reduction of the ground grid conductor extension.

  7. Alternative splicing of basic chitinase gene PR3b in the low-nicotine mutants of Nicotiana tabacum L. cv. Burley 21

    PubMed Central

    Ma, Haoran; Wang, Feng; Wang, Wenjing; Yin, Guoying; Zhang, Dingyu; Ding, Yongqiang; Timko, Michael P.; Zhang, Hongbo

    2016-01-01

    Two unlinked semi-dominant loci, A (NIC1) and B (NIC2), control nicotine and related alkaloid biosynthesis in Burley tobaccos. Mutations in either or both loci (nic1 and nic2) lead to low nicotine phenotypes with altered environmental stress responses. Here we show that the transcripts derived from the pathogenesis-related (PR) protein gene PR3b are alternatively spliced to a greater extent in the nic1 and nic2 mutants of Burley 21 tobacco and the nic1nic2 double mutant. The alternative splicing results in a deletion of 65 nucleotides and introduces a premature stop codon into the coding region of PR3b that leads to a significant reduction of PR3b specific chitinase activity. Assays of PR3b splicing in F2 individuals derived from crosses between nic1 and nic2 mutants and wild-type plants showed that the splicing phenotype is controlled by the NIC1 and NIC2 loci, even though NIC1 and NIC2 are unlinked loci. Moreover, the transcriptional analyses showed that the splicing patterns of PR3b in the low-nicotine mutants were differentially regulated by jasmonate (JA) and ethylene (ET). These data suggest that the NIC1 and NIC2 loci display differential roles in regulating the alternative splicing of PR3b in Burley 21. The findings in this study have provided valuable information for extending our understanding of the broader effects of the low-nicotine mutants of Burley 21 and the mechanism by which JA and ET signalling pathways post-transcriptionally regulate the activity of PR3b protein. PMID:27664270

  8. Neural networks for fault location in substations

    SciTech Connect

    Alves da Silva, A.P.; Silveira, P.M. da; Lambert-Torres, G.; Insfran, A.H.F.

    1996-01-01

    Faults producing load disconnections or emergency situations have to be located as soon as possible to start the electric network reconfiguration, restoring normal energy supply. This paper proposes the use of artificial neural networks (ANNs), of the associative memory type, to solve the fault location problem. The main idea is to store measurement sets representing the normal behavior of the protection system, considering the basic substation topology only, into associated memories. Afterwards, these memories are employed on-line for fault location using the protection system equipment status. The associative memories work correctly even in case of malfunction of the protection system and different pre-fault configurations. Although the ANNs are trained with single contingencies only, their generalization capability allows a good performance for multiple contingencies. The resultant fault location system is in operation at the 500 kV gas-insulated substation of the Itaipu system.

  9. Modeling and Simulating Blast Effects on Electric Substations

    SciTech Connect

    Lyle G. Roybal; Robert F. Jeffers; Kent E. McGillivary; Tony D. Paul; Ryan Jacobson

    2009-05-01

    A software simulation tool was developed at the Idaho National Laboratory to estimate the fragility of electric substation components subject to an explosive blast. Damage caused by explosively driven fragments on a generic electric substation was estimated by using a ray-tracing technique to track and tabulate fragment impacts and penetrations of substation components. This technique is based on methods used for assessing vulnerability of military aircraft and ground vehicles to explosive blasts. An open-source rendering and ray-trace engine was used for geometric modeling and interactions between fragments and substation components. Semi-empirical material interactions models were used to calculate blast parameters and simulate high-velocity material interactions between explosively driven fragments and substation components. Finally, a Monte Carlo simulation was added to model the random nature of fragment generation allowing a skilled analyst to predict failure probabilities of substation components.

  10. 9. STATION 'L', LOOKING NORTHWEST FROM SOUTHEAST DIVISION, LINCOLN SUBSTATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. STATION 'L', LOOKING NORTHWEST FROM SOUTHEAST DIVISION, LINCOLN SUBSTATION IN FOREGROUND - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  11. 69. 129 HILLSIDE AVENUE, BRONX, SUBSTATION, D. C. SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    69. 129 HILLSIDE AVENUE, BRONX, SUBSTATION, D. C. SIDE OF ROTARY VISIBLE-NOTE COPPER BRUSHES IN PLACE OF SLIP RINGS. THE THREE TRANSFORMER '5'S REDUCE VOLTAGE OF CURRENT PASSING TO ROTARY '5'. NOTE ROTARY CONVERTER MOUNTED IN HARDWOOD BASE INDEPENDENT OF SUBSTATION FLOOR. - Interborough Rapid Transit Subway (Original Line), New York County, NY

  12. Discovering conformational sub-states relevant to protein function

    SciTech Connect

    Agarwal, Pratul K; Ramanathan, Arvind

    2011-01-01

    Internal motions enable proteins to explore a range of conformations, even in the vicinity of native state. The role of conformational fluctuations in the designated function of a protein is widely debated. Emerging evidence suggests that sub-groups within the range of conformations (or sub-states) contain properties that may be functionally relevant. However, low populations in these sub-states and the transient nature of conformational transitions between these sub-states present significant challenges for their identification and characterization. To overcome these challenges we have developed a new computational technique, quasi-anharmonic analysis (QAA). QAA utilizes higher-order statistics of protein motions to identify sub-states in the conformational landscape. Further, the focus on anharmonicity allows identification of conformational fluctuations that enable transitions between sub-states. QAA applied to equilibrium simulations of human ubiquitin and T4 lysozyme reveals functionally relevant sub-states and protein motions involved in molecular recognition. In combination with a reaction pathway sampling method, QAA characterizes conformational sub-states associated with cis/trans peptidyl-prolyl isomerization catalyzed by the enzyme cyclophilin A. In these three proteins, QAA allows identification of conformational sub-states, with critical structural and dynamical features relevant to protein function. Overall, QAA provides a novel framework to intuitively understand the biophysical basis of conformational diversity and its relevance to protein function.

  13. Environmental Assessment : Happy Valley [Substation Project].

    SciTech Connect

    United States. Bonneville Power Administration.

    1982-05-01

    The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

  14. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  15. Shallow ground-water quality adjacent to burley tobacco fields in northeastern Tennessee and southwestern Virginia, spring 1997

    USGS Publications Warehouse

    Johnson, G.C.; Connell, J.F.

    2001-01-01

    In 1994, the U.S. Geological Survey began an assessment of the upper Tennessee River Basin as part of the National Water-Quality Assessment (NAWQA) Program. A ground-water land-use study conducted in 1996 focused on areas with burley tobacco production in northeastern Tennessee and southwestern Virginia. Land-use studies are designed to focus on specific land uses and to examine natural and human factors that affect the quality of shallow ground water underlying specific types of land use. Thirty wells were drilled in shallow regolith adjacent to and downgradient of tobacco fields in the Valley and Ridge Physiographic Province of the upper Tennessee River Basin. Ground-water samples were collected between June 4 and July 9, 1997, to coincide with the application of the majority of pesticides and fertilizers used in tobacco production. Ground-water samples were analyzed for nutrients, major ions, 79 pesticides, 7 pesticide degradation products, 86 volatile organic compounds, and dissolved organic carbon. Nutrient concentrations were lower than the levels found in similar NAWQA studies across the United States during 1993-95. Five of 30 upper Tennessee River Basin wells (16.7 percent) had nitrate levels exceeding 10 mg/L while 19 percent of agricultural land-use wells nationally and 7.9 percent in the Southeast had nitrate concentrations exceeding 10 mg/L. Median nutrient concentrations were equal to or less than national median concentrations. All pesticide concentrations in the basin were less than established drinking water standards, and pesticides were detected less frequently than average for other NAWQA study units. Atrazine was detected at 8 of 30 (27 percent) of the wells, and deethylatrazine (an atrazine degradation product) was found in 9 (30 percent) of the wells. Metalaxyl was found in 17 percent of the wells, and prometon, flumetralin, dimethomorph, 2,4,5-T, 2,4-D, dichlorprop, and silvex were detected once each (3 percent). Volatile organic compounds

  16. Study on noise prediction model and control schemes for substation.

    PubMed

    Chen, Chuanmin; Gao, Yang; Liu, Songtao

    2014-01-01

    With the government's emphasis on environmental issues of power transmission and transformation project, noise pollution has become a prominent problem now. The noise from the working transformer, reactor, and other electrical equipment in the substation will bring negative effect to the ambient environment. This paper focuses on using acoustic software for the simulation and calculation method to control substation noise. According to the characteristics of the substation noise and the techniques of noise reduction, a substation's acoustic field model was established with the SoundPLAN software to predict the scope of substation noise. On this basis, 4 reasonable noise control schemes were advanced to provide some helpful references for noise control during the new substation's design and construction process. And the feasibility and application effect of these control schemes can be verified by using the method of simulation modeling. The simulation results show that the substation always has the problem of excessive noise at boundary under the conventional measures. The excess noise can be efficiently reduced by taking the corresponding noise reduction methods. PMID:24672356

  17. Study on noise prediction model and control schemes for substation.

    PubMed

    Chen, Chuanmin; Gao, Yang; Liu, Songtao

    2014-01-01

    With the government's emphasis on environmental issues of power transmission and transformation project, noise pollution has become a prominent problem now. The noise from the working transformer, reactor, and other electrical equipment in the substation will bring negative effect to the ambient environment. This paper focuses on using acoustic software for the simulation and calculation method to control substation noise. According to the characteristics of the substation noise and the techniques of noise reduction, a substation's acoustic field model was established with the SoundPLAN software to predict the scope of substation noise. On this basis, 4 reasonable noise control schemes were advanced to provide some helpful references for noise control during the new substation's design and construction process. And the feasibility and application effect of these control schemes can be verified by using the method of simulation modeling. The simulation results show that the substation always has the problem of excessive noise at boundary under the conventional measures. The excess noise can be efficiently reduced by taking the corresponding noise reduction methods.

  18. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  19. 9. VIEW EASTSOUTHEAST, LEANTO AND SUBSTATION ALONG NORTH ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. VIEW EAST-SOUTHEAST, LEAN-TO AND SUB-STATION ALONG NORTH ELEVATION - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  20. 48. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. INTERIOR OF CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. INTERIOR OF CONTROL BUILDING, SHOWING TWO ROWS OF STEVENS STAGE RECORDERS AND INFLOW PROGRAMMERS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  1. 39. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW OF MISSISSIPPI ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW OF MISSISSIPPI RIVER, LOOKING UPSTREAM FROM THE CONFLUENCE OF THE OHIO AND MISSISSIPPI RIVERS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  2. POWERHOUSES, SOUTH ELEVATIONS SHOWING OIL HOUSE, FILER SUBSTATION, AND DRAFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    POWERHOUSES, SOUTH ELEVATIONS SHOWING OIL HOUSE, FILER SUBSTATION, AND DRAFT TUBE OUTLET (TAILRACE), VERTICAL VIEW; FACING WEST - Shoshone Falls Hydroelectric Project, Canyon Road, North Bank of Snake River below Shoshone Falls, Tipperary Corner, Jerome County, ID

  3. 20. Zoo Substation. Philadelphia, Philadelphia Co., PA. Sec. 1101, MP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Zoo Substation. Philadelphia, Philadelphia Co., PA. Sec. 1101, MP 87.25. - Northeast Railroad Corridor, Amtrak route between Delaware-Pennsylvania & Pennsylvania-New Jersey state lines, Philadelphia, Philadelphia County, PA

  4. 46. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF INFLOW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF INFLOW CONTROLLER WITH ORIGINAL CAPACITOR BANK. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  5. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... substation, the following shall be determined: (i) What facilities are energized, and (ii) What protective... is in progress. (h) Footing excavation. (1) Excavation for auger, pad and piling type footings...

  6. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... substation, the following shall be determined: (i) What facilities are energized, and (ii) What protective... is in progress. (h) Footing excavation. (1) Excavation for auger, pad and piling type footings...

  7. Overview of MWD 1 southeast of Boulder City Substation. MWD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of MWD 1 southeast of Boulder City Substation. MWD 2 on left; newer Nevada Power Company line on right - Hoover Dam, Metropolitan Water District Line 1, U.S. Highway 93, Boulder City, Clark County, NV

  8. LANDOVER SUBSTATION. LANDOVER, PRINCE GEORGES CO., MD Sec, 1201, MP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LANDOVER SUBSTATION. LANDOVER, PRINCE GEORGES CO., MD Sec, 1201, MP 129.00. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  9. B & P Junction Substation & Interlocking Tower. Baltimore, Baltimore ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    B & P Junction Substation & Interlocking Tower. Baltimore, Baltimore City, MD. Sec. 1201, MP 95.85. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  10. Loudon Park Substation. Violetville, Baltimore City, MD. Sec. 1201, MP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Loudon Park Substation. Violetville, Baltimore City, MD. Sec. 1201, MP 100.50. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  11. BOWIE SUBSTATION. BOWIE, PRINCE GEORGES CO., MD Sec. 1201, MP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BOWIE SUBSTATION. BOWIE, PRINCE GEORGES CO., MD Sec. 1201, MP 129.55. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  12. 170. Credit SHS. Northern California Power Company substation, Bully Hill ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    170. Credit SHS. Northern California Power Company substation, Bully Hill Mine area. Note lack of vegetation, caused by nearby copper smelting works. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  13. SOUTH AND EAST ELEVATIONS, THE SUBSTATION HOUSED THE ELECTRICAL EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH AND EAST ELEVATIONS, THE SUBSTATION HOUSED THE ELECTRICAL EQUIPMENT USED TO CONVERT AND RECTIFY HIGH VOLTAGE ALTERNATING CURRENT TO A LOWER VOLTAGE DIRECT CURRENT REQUIRED TO OPERATE MINE LOCOMOTIVES AND OTHER MINE EQUIPMENT; NOTE SURFACE HAULAGE TRACK (FOREGROUND) AND FIRE PROOF STONE CONSTRUCTION - Nuttallburg Mine Complex, Substation, North side of New River, 2.7 miles upstream from Fayette Landing, Lookout, Fayette County, WV

  14. National SCADA Test Bed Substation Automation Evaluation Report

    SciTech Connect

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  15. Protein Conformational Populations and Functionally Relevant Sub-states

    SciTech Connect

    Agarwal, Pratul K; Burger, Virginia; Savol, Andrej; Ramanathan, Arvind; Chennubhotla, Chakra

    2013-01-01

    Functioning proteins do not remain fixed in a unique structure, but instead they sample a range of conformations facilitated by motions within the protein. Even in the native state, a protein exists as a collection of interconverting conformations driven by thermodynamic fluctuations. Motions on the fast time scale allow a protein to sample conformations in the nearby area of its conformational landscape, while motions on slower time scales give it access to conformations in distal areas of the landscape. Emerging evidence indicates that protein landscapes contain conformational substates with dynamic and structural features that support the designated function of the protein. Nuclear magnetic resonance (NMR) experiments provide information about conformational ensembles of proteins. X-ray crystallography allows researchers to identify the most populated states along the landscape, and computational simulations give atom-level information about the conformational substates of different proteins. This ability to characterize and obtain quantitative information about the conformational substates and the populations of proteins within them is allowing researchers to better understand the relationship between protein structure and dynamics and the mechanisms of protein function. In this Account, we discuss recent developments and challenges in the characterization of functionally relevant conformational populations and substates of proteins. In some enzymes, the sampling of functionally relevant conformational substates is connected to promoting the overall mechanism of catalysis. For example, the conformational landscape of the enzyme dihydrofolate reductase has multiple substates, which facilitate the binding and the release of the cofactor and substrate and catalyze the hydride transfer. For the enzyme cyclophilin A, computational simulations reveal that the long time scale conformational fluctuations enable the enzyme to access conformational substates that allow

  16. Intelligent devices simplify remote SCADA installations in substations

    SciTech Connect

    Kopriva, V.J.

    1994-12-31

    Utilities are increasingly relying on Supervisory Control and Data Acquisition (SCADA) Systems for the effective and economical management of electric transmission and distribution systems. Now, advances in equipment and design technologies have created opportunities for an increased level of monitoring and control at electric power substations. In the past, prohibitive factors, including complicated equipment and wiring retrofits, protocol compatibility, and hardware installation and maintenance costs have impeded electric utilities in their attempt at broad based application of SCADA systems in electric substations, particularly at distribution voltage levels. These advances in equipment technologies have provided utilities with the opportunity to install and operate SCADA systems at lower cost, while providing flexibility for system expansion over longer periods. The development of intelligent microprocessor controlled devices and integrated communications has facilitated the use of a distributed design approach to installing SCADA monitoring and control in substations. This approach offers greater hardware flexibility and reduced installation costs while increasing reliability, making the addition of monitoring and control to electric substations increasingly practical. This paper will examine current trends in the application of intelligent microprocessor controlled and electronic devices, in stand alone and distributed applications, and the simplification of techniques for installing SCADA systems in substations. It will also consider the potential advantages to be realized in cost and reliability, and examine the necessary changes in design and operation philosophies required to effectively implement the new technology.

  17. Conformational Sub-states and Populations in Enzyme Catalysis.

    PubMed

    Agarwal, P K; Doucet, N; Chennubhotla, C; Ramanathan, A; Narayanan, C

    2016-01-01

    Enzyme function involves substrate and cofactor binding, precise positioning of reactants in the active site, chemical turnover, and release of products. In addition to formation of crucial structural interactions between enzyme and substrate(s), coordinated motions within the enzyme-substrate complex allow reaction to proceed at a much faster rate, compared to the reaction in solution and in the absence of enzyme. An increasing number of enzyme systems show the presence of conserved protein motions that are important for function. A wide variety of motions are naturally sampled (over femtosecond to millisecond time-scales) as the enzyme complex moves along the energetic landscape, driven by temperature and dynamical events from the surrounding environment. Areas of low energy along the landscape form conformational sub-states, which show higher conformational populations than surrounding areas. A small number of these protein conformational sub-states contain functionally important structural and dynamical features, which assist the enzyme mechanism along the catalytic cycle. Identification and characterization of these higher-energy (also called excited) sub-states and the associated populations are challenging, as these sub-states are very short-lived and therefore rarely populated. Specialized techniques based on computer simulations, theoretical modeling, and nuclear magnetic resonance have been developed for quantitative characterization of these sub-states and populations. This chapter discusses these techniques and provides examples of their applications to enzyme systems. PMID:27497171

  18. Conformational Sub-states and Populations in Enzyme Catalysis

    SciTech Connect

    Agarwal, Pratul K; Doucet, Nicholas; Chennubholta, C; Ramanathan, Arvind

    2016-01-01

    reactants in the active site, chemical turnover, and release of products. In addition to formation of crucial structural interactions between enzyme and substrate(s), coordinated motions within the enzyme substrate complex allow reaction to proceed at a much faster rate, compared to the reaction in solution and in the absence of enzyme. An increasing number of enzyme systems show the presence of conserved protein motions that are important for function. A wide variety of motions are naturally sampled (over femtosecond to millisecond time-scales) as the enzyme complex moves along the energetic landscape, driven by temperature and dynamical events from the surrounding environment. Areas of low energy along the landscape form conformational sub-states, which show higher conformational populations than surrounding areas. A small number of these protein conformational sub-states contain functionally important structural and dynamical features, which assist the enzyme mechanism along the catalytic cycle. Identification and characterization of these higher-energy (also called excited) sub-states and the associated populations are challenging, as these sub-states are very short-lived and therefore rarely populated. Specialized techniques based on computer simulations, theoretical modeling, and nuclear magnetic resonance have been developed for quantitative characterization of these sub-states and populations. This chapter discusses these techniques and provides examples of their applications to enzyme systems.

  19. Credit BG. View looks northeast (56°) across substation foundation toward ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. View looks northeast (56°) across substation foundation toward Building 4318 (Warehouse) and Building 4401 (Hangar No. 1) - Edwards Air Force Base, North Base, Electrical Substation, Second & D Streets, Boron, Kern County, CA

  20. View to the north of the Substation OvertheHorizon Backscatter ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View to the north of the Substation - Over-the-Horizon Backscatter Radar Network, Christmas Valley Radar Site Transmit Sector Five Substation, On unnamed road west of Lost Forest Road, Christmas Valley, Lake County, OR

  1. View to the northwest of the Substation OvertheHorizon Backscatter ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View to the northwest of the Substation - Over-the-Horizon Backscatter Radar Network, Christmas Valley Radar Site Transmit Sector Four Substation, On unnamed road west of Lost Forest Road, Christmas Valley, Lake County, OR

  2. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  3. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  4. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  5. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  6. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground electric substations and liquid... Underground electric substations and liquid storage facilities. The requirements of this standard apply to...) Electric substations. (2) Unburied, combustible liquid storage tanks. (3) Any group of containers used...

  7. 8. VIEW EASTNORTHEAST OF TRANSFORMER BAYS AND SUBSTATION; BUILDING 8 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW EAST-NORTHEAST OF TRANSFORMER BAYS AND SUB-STATION; BUILDING 8 IS AT EXTREME LEFT CENTER; BUILD-ING 50 IS VISIBLE AT LEFT CENTER BEHIND BUILDING 8 - Scovill Brass Works, 59 Mill Street, Waterbury, New Haven County, CT

  8. 70. HILLSIDE AVENUE, BRONX, SUBSTATION, LOOKING SOUTH TO RAISED CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    70. HILLSIDE AVENUE, BRONX, SUBSTATION, LOOKING SOUTH TO RAISED CONTROL POARD GALLERY. VIEW DOWN ROW OF ROTARY CONVERTERS, ALTERNATING CURRENT SIDE-NOTE SLIP RINGS ON SONVERTED SHAFT JUST AT THE HUB. - Interborough Rapid Transit Subway (Original Line), New York County, NY

  9. 43. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 200 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. DETAIL OF 200 GALLON PER MINUTE INFLOW CONTROLLER WITH NEW PROGRAMMER, LOCATED ALONG THE NATCHEZ SECTION OF THE MODEL. NOTE CONTROL BUILDING AT LEFT. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  10. 38. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. MISSISSIPPI BASIN MODEL AT CLINTON SUBSTATION. VIEW FROM THE MAIN OBSERVATION TOWER OF THE MISSISSIPPI RIVER, LOOKING DOWNSTREAM, FROM JUST SOUTH OF THE CONFLUENCE OF THE OHIO AND MISSISSIPPI RIVERS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS

  11. 23. Historic view, Building 104. View northwest, east side substation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Historic view, Building 104. View northwest, east side substation addition. Photocopy of 1936 photo in Navy/NPS Archives, Charlestown Navy Yard - Charlestown Navy Yard, Shipfitters' Shop, Southeast side of First Avenue between Ninth & Thirteenth Streets, Boston, Suffolk County, MA

  12. 7. VIEW OF THE MODERN SUBSTATION (FOREGROUND), WITH THE OLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF THE MODERN SUBSTATION (FOREGROUND), WITH THE OLD SWITCHING BUILDING IN THE BACKGROUND, LOOKING SOUTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  13. GENERAL VIEW OF FLIGHT LINE SUPPORT BUILDINGS (ELECTRICAL SUBSTATION, BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF FLIGHT LINE SUPPORT BUILDINGS (ELECTRICAL SUBSTATION, BUILDING 2775; SURVIVAL EQUIPMENT SHOP (PARACHUTE AND DINGY SHOP), BUILDING 2784; MAINTENANCE DOCK (BUILDING 2785) AND BUILDING 2783 WAR). VIEW TO SOUTHWEST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  14. Reliability centered maintenance (RCM) for substations project overview

    SciTech Connect

    Lyons, P.F.

    1996-08-01

    An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

  15. B & P Junction Substation & Interlocking Tower; Howard Street ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    B & P Junction Substation & Interlocking Tower; Howard Street Bridge. Baltimore, Baltimore City, MD. Sec. 1201, MP 95.85 - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  16. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    SciTech Connect

    Not Available

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  17. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  18. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  19. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  20. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  1. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Surface electric substations and liquid storage... substations and liquid storage facilities. The requirements of this standard apply to surface areas only. (a... liquid storage tanks. (3) Any group of containers used for storage of more than 60 gallons of...

  2. Functional Sub-states by High-pressure Macromolecular Crystallography.

    PubMed

    Dhaussy, Anne-Claire; Girard, Eric

    2015-01-01

    At the molecular level, high-pressure perturbation is of particular interest for biological studies as it allows trapping conformational substates. Moreover, within the context of high-pressure adaptation of deep-sea organisms, it allows to decipher the molecular determinants of piezophily. To provide an accurate description of structural changes produced by pressure in a macromolecular system, developments have been made to adapt macromolecular crystallography to high-pressure studies. The present chapter is an overview of results obtained so far using high-pressure macromolecular techniques, from nucleic acids to virus capsid through monomeric as well as multimeric proteins.

  3. Development of Protection and Control Unit for Distribution Substation

    NASA Astrophysics Data System (ADS)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  4. Measurements and computations of electromagnetic fields in electric power substations

    SciTech Connect

    Daily, W.K. ); Dawalibi, F. )

    1994-01-01

    The magnetic fields generated by a typical distribution substation were measured and calculated based on a computer model which takes into account currents in the grounding systems, distribution feeder neutrals, overhead ground wires and induced currents in equipment structures and ground grid loops. Both measured and computer results indicate that magnetic fields are significantly influenced by ground currents, as well as induced currents in structures and ground system loops. All currents in the network modeled were computed, based on the measured currents impressed at the boundary points (ends of the conductor network). The agreement between the measured and computer values is good. Small differences were observed and are attributed mainly to uncertainties in the geometry of the network model and phase angles of some of the currents in the neutral conductors which were not measured in the field. Further measurements, including more accurate geometrical information and phase angles, are planned.

  5. High Pressure NMR Methods for Characterizing Functional Substates of Proteins.

    PubMed

    Kalbitzer, Hans Robert

    2015-01-01

    Proteins usually exist in multiple conformational states in solution. High pressure NMR spectroscopy is a well-suited method to identify these states. In addition, these states can be characterized by their thermodynamic parameters, the free enthalpies at ambient pressure, the partial molar volumes, and the partial molar compressibility that can be obtained from the analysis of the high pressure NMR data. Two main types of states of proteins exist, functional states and folding states. There is a strong link between these two types, the functional states represent essential folding states (intermediates), other folding states may have no functional meaning (optional folding states). In this chapter, this concept is tested on the Ras protein, an important proto-oncogen in humans where all substates required by theory can be identified experimentally by high pressure NMR spectroscopy. Finally, we show how these data can be used to develop allosteric inhibitors of proteins. PMID:26174382

  6. HEMP-induced transients in electric power substations. Final report

    SciTech Connect

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M.

    1992-02-01

    A nuclear detonation in or above the earth`s atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T & D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  7. HEMP-induced transients in electric power substations

    SciTech Connect

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M. )

    1992-02-01

    A nuclear detonation in or above the earth's atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  8. 67. SUBSTATION 15, 606 WEST 143RD STREET, GALLERY EQUIPMENT. NOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    67. SUBSTATION 15, 606 WEST 143RD STREET, GALLERY EQUIPMENT. NOTE ADDITION OF MIMIC BOARD BETWEEN D. C. CIRCUIT BREAKER SWITCHES AND G. E. INSTRUMENT PANEL. - Interborough Rapid Transit Subway (Original Line), New York County, NY

  9. NY32649 ELECTRICAL SUBSTATION (BUILDING 2675) AND EDUCATION CENTER (BUILDING 2670) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NY-326-49 ELECTRICAL SUBSTATION (BUILDING 2675) AND EDUCATION CENTER (BUILDING 2670) AT NORTH END OF ARIZONA AVENUE. VIEW TO NORTHEAST. - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  10. Flow and heat distribution analysis of different transformer sub-stations

    NASA Astrophysics Data System (ADS)

    Hasini, H.; Shuaib, N. H.; Yogendran, S. B.; Toh, K. B.

    2013-12-01

    This paper describes CFD investigation on the flow and heat transfer in transformers at different sub-station buildings. The analysis aimed to determine the cooling capability of the existing transformer building employing natural ventilation system to dissipate heat sufficiently when new dry-type transformer operating under full load condition is used. The transformer and building models were developed based on the actual transformer configuration in operation at three different locations in Malaysia. The calculation was carried out on three different types of sub-stations namely stand-alone, attach-to-building and underground. The effect of natural ventilation speed and building volume on the transformer surfaces temperature are also investigated. It was predicted that the existing sub-station configuration is able to dissipate heat produced from the dry type transformer by using its natural ventilation system regardless of the sub-station types. However, the smallest building case shows relatively high surrounding temperature.

  11. Perryman Substation. Perryman, Hareford Co., MD. Sec. 1201, MP 69.30 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Perryman Substation. Perryman, Hareford Co., MD. Sec. 1201, MP 69.30 - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  12. Gunpowder Substation. Harewood, Baltimore Co., MD. Sec. 1201, MP 80.00. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Gunpowder Substation. Harewood, Baltimore Co., MD. Sec. 1201, MP 80.00. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  13. North Point Substation. Rosedale, Baltimore Co., MD. Sec. 1201, 90.00. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    North Point Substation. Rosedale, Baltimore Co., MD. Sec. 1201, 90.00. - Northeast Railroad Corridor, Amtrak route between District of Columbia/Maryland state line & Maryland/Delaware state line, Baltimore, Independent City, MD

  14. HendersonMead Transmission Line 2 southwest of Boulder City Substation, view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Henderson-Mead Transmission Line 2 southwest of Boulder City Substation, view southwest - Hoover Dam, Henderson-Mead Transmission Line 2, Spanning Colorado River at Route 93, Boulder City, Clark County, NV

  15. IET. Exclusion guard house (TAN621) and unit substation (TAN622). Elevations ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET. Exclusion guard house (TAN-621) and unit substation (TAN-622). Elevations and floor plan. Also show concrete pad for substation. Ralph M. Parsons 902-4-ANP-621-622-A&S 411. Date: February 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0621-60-693-106968 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  16. [Offshore substation workers' exposure to harmful factors - Actions minimizing risk of hazards].

    PubMed

    Piotrowski, Paweł Janusz; Robak, Sylwester; Polewaczyk, Mateusz Maksymilian; Raczkowski, Robert

    2016-01-01

    The current development of electric power industry in Poland, especially in the field of renewable energy sources, including wind power, brings about the need to introduce legislation on new work environment. The development of occupational safety and health (OSH) regulations that must be met by new workplaces, such as offshore substations becomes necessary in view of the construction of modern offshore wind power plants - offshore wind farms. Staying on offshore substation is associated with an increased exposure to harmful health factors: physical, chemical, biological and psychophysical. The main sources of health risks on offshore substations are: temperature, electromagnetic field, noise from operating wind turbines, direct and alternating current, chemicals, Legionella bacteria and social isolation of people. The aim of this article is to draw attention to the problem of offshore substation workers' exposure to harmful factors and to present methods of preventing and reducing the risk-related adverse health effects. In this paper, there are identified and described risks occurring on offshore substations (fire, explosion, lightning, accidents at work). Some examples of the means and the methods for reducing the negative impact of exposure on the human health are presented and discussed. The article also highlights the need to develop appropriate laws and health and safety regulations concerning the new working environment at the offshore substations. The review of researches and international standards shows that some of them can be introduced into the Polish labor market. PMID:27044719

  17. Transitions among H Stark substates induced by time-varying, weak static electric fields

    NASA Astrophysics Data System (ADS)

    Butz, A.; Koch, P. M.; Schultz, K. D.; Wilson, J.

    2002-05-01

    Our laboratory produces H Rydberg atoms (typically 14 keV) with a collision/laser method. H^+-Xe collisions produce H(n) atoms. A 100 kV/cm field ionizes n>9. In F1 near 30 kV/cm, a CO2 laser transfers 50% of (n,n_1,|m|)=(7,0,0) atoms to (10,0,0) (or other chosen substate). They fly through F2 and are excited in F3 with a CO2 laser from n=10 substates to n>24 substates. Each F is transverse between parallel plates, but we separately control the voltage to all six plates. If all Fi are parallel and F_2, F3 exceed a few V/cm, population stays on the (10,0,0) substate, and we get a `simple' excitation spectrum in F_3. If F2 or F3 (or both) is too weak or antiparallel, we detect new excitation peaks in F3 from atoms moved into other n=10 substates. Our experimental goal is careful, quantitative measurements and interpretation of these excitation spectra to understand where the population goes. Our theoretical goal is a model for this process similar to that for Majorana depolarization of magnetic substates in Lamb-shift polarized ion sourcesfootnote G.G. Ohlsen, Los Alamos Report LA-3949 (1968); W.J. Thompson, Nucl. Instr. Meth. A 333, 443 (1993). .

  18. [Offshore substation workers' exposure to harmful factors - Actions minimizing risk of hazards].

    PubMed

    Piotrowski, Paweł Janusz; Robak, Sylwester; Polewaczyk, Mateusz Maksymilian; Raczkowski, Robert

    2016-01-01

    The current development of electric power industry in Poland, especially in the field of renewable energy sources, including wind power, brings about the need to introduce legislation on new work environment. The development of occupational safety and health (OSH) regulations that must be met by new workplaces, such as offshore substations becomes necessary in view of the construction of modern offshore wind power plants - offshore wind farms. Staying on offshore substation is associated with an increased exposure to harmful health factors: physical, chemical, biological and psychophysical. The main sources of health risks on offshore substations are: temperature, electromagnetic field, noise from operating wind turbines, direct and alternating current, chemicals, Legionella bacteria and social isolation of people. The aim of this article is to draw attention to the problem of offshore substation workers' exposure to harmful factors and to present methods of preventing and reducing the risk-related adverse health effects. In this paper, there are identified and described risks occurring on offshore substations (fire, explosion, lightning, accidents at work). Some examples of the means and the methods for reducing the negative impact of exposure on the human health are presented and discussed. The article also highlights the need to develop appropriate laws and health and safety regulations concerning the new working environment at the offshore substations. The review of researches and international standards shows that some of them can be introduced into the Polish labor market.

  19. A Survey of Special Education Administrators of Programs Field Testing the Social Learning Curriculum. An Occasional Paper.

    ERIC Educational Resources Information Center

    Goldstein, Marjorie T.; MacClymont, Peggy

    Forty-eight Social Learning Curriculum (SLC--an innovative educational program for mentally handicapped children) administrators were surveyed to compare SLC programs, their administrators' personal and professional characteristics, and substative responsibilities with special education programs and administrators in general. The results of a…

  20. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82)

    SciTech Connect

    Howington, John

    2002-08-13

    Vegetation Management for twenty-four Substations in the Burley District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region.

  1. Equipment trouble report and equipment diagnostic database for substations

    SciTech Connect

    Cocco, J.A. Jr.

    1996-03-01

    I remember watching the Star Trek movie where Mr. Scott sits down in front of a computer, like the one on my desk, and asks the computer to display information for him. The computer does not respond. He has to type into the computer and know enough about the use of computers to retrieve information. If computers today were capable of responding to voice commands and they had every bit of information available faster than we could process it, even the most inept computer person would be able to retrieve information quickly and easily. The problem is that we are in the middle between Star Trek`s talking information warehouse computers and a paper driven system. In fact, most substation maintenance groups are still in the paper stored in file cabinets mode for most diagnostic test information. That is where Pennsylvania Power & Light Company (PP&L) was two years ago. However, PP&L is now headed for the future through PC-based database tools. The Reliability Analysis Database (RAD) was developed to initiate the process of gathering trouble report and diagnostic information into a simple to use database with reports and graphical display capabilities for trending.

  2. Multipole mixing ratios and substate populations in Rn-219

    NASA Astrophysics Data System (ADS)

    Jones, G. D.

    2016-08-01

    Historical alpha-gamma angular correlation data for the decay of 223Ra into excited states of 219Rn have been analysed, using the correct spins of the states involved, for the first time. The analyses produced multipole mixing ratios (E2/M1) of δ (144)=-0.11\\+/- 0.03, δ (154)=0, δ (158)=-0.205\\+/- 0.018 and δ (269)=-0.149\\+/- 0.004 where the nominal transition energies, in keV, are given in brackets. These values are consistent with published values obtained from internal conversion electron spectroscopy. It is also found that δ (324)=0 and δ (338)=-0.235\\+/- 0.030 (where both values differ from current tabulations) and that the sign of the multipole mixing ratio for the 122 keV transition is negative. The 158, 269 and 338 keV states are found to be aligned with high population of M=+/- 3/2 substates and the 127 keV state is believed to have undergone spin relaxation.

  3. Application of Service Oriented Architecture for Sensors and Actuators in District Heating Substations

    PubMed Central

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-01-01

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation. PMID:25196165

  4. Application of service oriented architecture for sensors and actuators in district heating substations.

    PubMed

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-08-21

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation.

  5. Application of service oriented architecture for sensors and actuators in district heating substations.

    PubMed

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-01-01

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation. PMID:25196165

  6. Deterring Asymmetric Threats from Sub-State Actors

    SciTech Connect

    Homsy, R V

    2002-01-31

    Deterrence means preventing another's actions by influencing their decisionmaking process. Nuclear deterrence was successfully accomplished during the Cold War by holding the adversary's valuable assets at risk by targeting them with nuclear weapons, a policy known as mutually assured destruction (MAD). In this case neither player attacks the other, because the ultimate outcome is self-destruction. Deterrence based upon MAD is largely ineffective against sub-state actors who may have few if any assets, the location of which may be unknown. Furthermore, the threat of destroying their assets may only serve to strengthen their motivation to do more stealthy violence, the threat being interpreted as a taunt. The key to establishing deterrence is understanding the adversary's decision process, starting with the factors upon which decisions are made, called decision attributes. Asymmetric threats are assumed to involve chemical, biological, radiological, or nuclear (CBRN) weapons. So, the key decision attributes here are concerned with the acquisition and use of CBRN weapons. We have identified the following five countermeasure objectives for establishing deterrence: (1) Reduce access to CBRN weapons, expertise, materials, and equipment; (2) Make CBRN weapons difficult to use; (3) Reduce the effectiveness of CBRN weapons; (4) Increase the likelihood of being caught acquiring and using CBRN weapons; and (5) Establish a policy of retribution for acquiring and using CBRN weapons. It should be emphasized that an adversary's perception toward these objectives is most important in affecting their decisionmaking. Of course each adversary will respond differently toward these countermeasures, depending upon their motivations, objectives, preferences, resources, and willingness to gamble. Motivation of violence is defined as the fundamental cause or driving force; absent which the intent to do violence no longer exists. Correct understanding of motivations requires adapting your

  7. Conformational Substates of Myoglobin Intermediate Resolved by Picosecond X-ray Solution Scattering.

    PubMed

    Oang, Key Young; Kim, Jong Goo; Yang, Cheolhee; Kim, Tae Wu; Kim, Youngmin; Kim, Kyung Hwan; Kim, Jeongho; Ihee, Hyotcherl

    2014-03-01

    Conformational substates of proteins are generally considered to play important roles in regulating protein functions, but an understanding of how they influence the structural dynamics and functions of the proteins has been elusive. Here, we investigate the structural dynamics of sperm whale myoglobin associated with the conformational substates using picosecond X-ray solution scattering. By applying kinetic analysis considering all of the plausible candidate models, we establish a kinetic model for the entire cycle of the protein transition in a wide time range from 100 ps to 10 ms. Four structurally distinct intermediates are formed during the cycle, and most importantly, the transition from the first intermediate to the second one (B → C) occurs biphasically. We attribute the biphasic kinetics to the involvement of two conformational substates of the first intermediate, which are generated by the interplay between the distal histidine and the photodissociated CO. PMID:24761190

  8. Consumers power delays new substation construction by controlling electric cart: Battery chargers

    SciTech Connect

    Bombery, M.F.; Duncan, T.R.

    1995-12-31

    During July of 1993, Consumers Power Company, Grand Rapids, Michigan, USA, was surprised by a series of electric system component failures due to overload. The outages resulted in widespread customer dissatisfaction within a 865 acre resort called Sandy Pines. Several conventional solutions were quickly implemented, but projections of continued load growth led to scheduling the construction of a new distribution substation. Current efforts are focusing on load control of electric golf cart battery chargers to shift the peak demand causing the overload and delay or cancel the planned new substation.

  9. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  10. NORTH EMBANKMENT IN FOREGROUND, WITH (LR) SUBSTATION (MI98D), POWERHOUSE (MI98C), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH EMBANKMENT IN FOREGROUND, WITH (L-R) SUBSTATION (MI-98-D), POWERHOUSE (MI-98-C), AND COOKE DAM POND IN BACKGROUND. VIEW TO SOUTH - Cooke Hydroelectric Plant, North Embankment, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  11. 123. ARAI Substation (ARA726) plan, elevation, security fence details, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. ARA-I Substation (ARA-726) plan, elevation, security fence details, and sections. Norman Engineering Company 961-area/SF-726-E-1. Date: January 1959. Ineel index code no. 068-0726-10-613-102778. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  12. Analysis on heat loss characteristics of a 10 kV HTS power substation

    NASA Astrophysics Data System (ADS)

    Teng, Yuping; Dai, Shaotao; Song, Naihao; Zhang, Jingye; Gao, Zhiyuan; Zhu, Zhiqin; Zhou, Weiwei; Wei, Zhourong; Lin, Liangzhen; Xiao, Liye

    2014-09-01

    A 10 kV High Temperature Superconducting power substation (10 kV HTS substation), supported by Chinese State 863 projects, was developed and has been running to supply power for several factories for more than two years at an industrial park of Baiyin, Gansu province in Northwest China. The system of the 10 kV HTS substation compositions, including a HTS cable, a HTS transformer, a SFCL, and a SMES, are introduced. The SMES works at liquid helium temperature and the other three apparatus operates under liquid nitrogen condition. There are mainly four types of heat losses existing in each HTS apparatus of the 10 kV HTS substation, including AC loss, Joule heat loss, conductive heat, and leak-in heat from cryostat. A small quantity of AC loss still exists due to the harmonic component of the current when it carries DC for HTS apparatus. The principle and basis for analysis of the heat losses are introduced and the total heat loss of each apparatus are calculated or estimated, which agree well with the test result. The analysis and result presented are of importance for the design of the refrigeration system.

  13. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  14. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  15. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  16. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  17. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electric substations and liquid storage... and liquid storage facilities. (a) If a hazard to persons could be created, no combustible materials...) Unburied, flammable or combustible liquid storage tanks. (3) Any group of containers used for storage...

  18. Title XX and CETA. A Coordination Guide for Title XX Administrators.

    ERIC Educational Resources Information Center

    Urban Management Consultants of San Francisco, Inc., CA.

    Written for the social service (Title XX) administrator at the State or sub-State level, this guide is intended to serve four major purposes: (1) Provide selected insights into what the Comprehensive Employment and Training Act (CETA) is and how it works; (2) point out potential areas for coordination which, from study or field experience, hold…

  19. An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

    NASA Technical Reports Server (NTRS)

    Kalu, Alex

    1990-01-01

    The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

  20. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-94) - Covington District Substations

    SciTech Connect

    Hermeston, Mark W.

    2002-07-19

    BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Covington District of the Snohomish Region. BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substations will include bareground management by herbicides of all areas within the fenced perimeter of the facility including a bareground zone of up to 3 meters (10 feet) outside of the fenced area. The management of vegetation outside the substation and associated facilities will include: 1) bare ground management of perimeter roads and parking areas; 2) control of noxious weeds throughout property boundaries; 3) mowing, fertilizing, and weed control of landscaped lawn and mulched areas; 4) weed control in ornamental shrub areas; and 5) areas requiring only mechanical control to manage unwanted/danger trees, grasses, and shrubs.

  1. 20 CFR 631.34 - Designation of substate areas.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... economic development programs, and the geographic boundaries of labor market areas within the State. (c... 631.34 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER... consistent with the effective delivery of services to eligible dislocated workers in the relevant...

  2. 20 CFR 631.34 - Designation of substate areas.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... economic development programs, and the geographic boundaries of labor market areas within the State. (c... 631.34 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER... consistent with the effective delivery of services to eligible dislocated workers in the relevant...

  3. Connection between the taxonomic substates and protonation of histidines 64 and 97 in carbonmonoxy myoglobin.

    PubMed Central

    Müller, J D; McMahon, B H; Chien, E Y; Sligar, S G; Nienhaus, G U

    1999-01-01

    Infrared spectra of heme-bound CO in sperm whale carbonmonoxy myoglobin and two mutants (H64L and H97F) were studied in the pH range from 4.2 to 9.5. Comparison of the native protein with the mutants shows that the observed pH effects can be traced to protonations of two histidine residues, H64 and H97, near the active site. Their imidazole sidechains experience simple, uncoupled Henderson-Hasselbalch type protonations, giving rise to four different protonation states. Because two of the protonation states are linked by a pH-independent equilibrium, the overall pH dependence of the spectra is described by a linear combination of three independent components. Global analysis, based on singular value decomposition and matrix least-squares algorithms enabled us to extract the pK values of the two histidines and the three basis spectra of the protonating species. The basis spectra were decomposed into the taxonomic substates A(0), A(1), and A(3), previously introduced in a heuristic way to analyze CO stretch spectra in heme proteins at fixed pH (see for instance, Biophys. J. 71:1563-1573). Moreover, an additional, weakly populated substate, called A(x), was identified. Protonation of H97 gives rise to a blue shift of the individual infrared lines by about 2 cm(-1), so that the A substates actually appear in pairs, such as A(0) and A(0)(+). The blue shift can be explained by reduced backbonding from the heme iron to the CO. Protonation of the distal histidine, H64, leads to a change of the infrared absorption from the A(1) or A(3) substate lines to A(0). This behavior can be explained by a conformational change upon protonation that moves the imidazole sidechain of H64 away from the CO into the high-dielectric solvent environment, which avoids the energetically unfavorable situation of an uncompensated electric charge in the apolar, low-dielectric protein interior. Our results suggest that protonation reactions serve as an important mechanism to create taxonomic

  4. ADM. Aerial view of administration area. Camera facing westerly. From ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ADM. Aerial view of administration area. Camera facing westerly. From left to right in foregound: Substation (TAN-605), Warehouse (TAN-628), Gate House (TAN-601), Administration Building (TAN-602). Left to right middle ground: Service Building (TAN-603), Warehouse (later known as Maintenance Shop or Craft Shop, TAN-604), Water Well Pump Houses, Fuel Tanks and Fuel Pump Houses, and Water Storage Tanks. Change House (TAN-606) on near side of berm. Large building beyond berm is A&M. Building, TAN-607. Railroad tracks beyond lead from (unseen) turntable to the IET. Date: June 6, 1955. INEEL negative no. 13201 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  5. Analysis of the 60-Hz power system at KSC: The Orsino substation

    NASA Technical Reports Server (NTRS)

    Kalu, Alex O.

    1989-01-01

    An analysis of the Orsino Substation, a component (50 percent) of the 60-Hertz electric power system at the Kennedy Space Center, is presented. Presented here are separate single-line diagrams of the sixteen feeder circuits to permit easy access to information on the individual feeders for future planning. The load condition of each feeder and load break switch are presented and a heuristic reliability analysis of the system is performed. Information is given about the system fashion useful for decision making purposes. The beauty of it is in the simplified manner by which information about the system can be obtained.

  6. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-96) - Snohomish District Substations

    SciTech Connect

    Hermeston, Mark W.

    2002-07-19

    Proposed Action: Vegetation Management for facilities located in the Snohomish District. BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Snohomish District of the Snohomish Region.

  7. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    SciTech Connect

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P.; Eyre, L.E.; Dell, L.D.; Kelly, D.S.

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes.

  8. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    SciTech Connect

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F.

    2006-01-15

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.

  9. Final environmental assessment for vegetation control at VHF stations, microwave stations, electrical substations, and pole yards

    SciTech Connect

    1995-10-13

    Southwestern Power Adm. operates very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards for electric power transmission throughout AR, MO, and OK. Vegetation growth at the stations must be suppressed for safety of operation and personnel. Southwestern has been using a combination of mechanical/manual and herbicide control for this purpose; Federally- mandated reductions in staff and budgetary resources require Southwestern to evaluate all potentially efficient methods for vegetation control. Three alternatives were examined: no action, mechanical/manual control, and (proposed) a combination of mechanical/manual and herbicide control. Environmental impacts on air and water quality, wetlands, wildlife, endangered species, archaeological and other resources, farmland, human health, transportation, etc. were evaluated.

  10. Dynamic Simulation on the Installation Process of HGIS in Transformer Substation

    NASA Astrophysics Data System (ADS)

    Lin, Tao; Li, Shaohua; Wang, Hu; Che, Deyong; Qi, Guangcai; Yao, Jianfeng; Zhang, Qingzhe

    The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.

  11. Administrative Synergy

    ERIC Educational Resources Information Center

    Hewitt, Kimberly Kappler; Weckstein, Daniel K.

    2012-01-01

    One of the biggest obstacles to overcome in creating and sustaining an administrative professional learning community (PLC) is time. Administrators are constantly deluged by the tyranny of the urgent. It is a Herculean task to carve out time for PLCs, but it is imperative to do so. In this article, the authors describe how an administrative PLC…

  12. Hazard zoning around electric substations of petrochemical industries by stimulation of extremely low-frequency magnetic fields.

    PubMed

    Hosseini, Monireh; Monazzam, Mohammad Reza; Farhang Matin, Laleh; Khosroabadi, Hossein

    2015-05-01

    Electromagnetic fields in recent years have been discussed as one of the occupational hazards at workplaces. Hence, control and assessment of these physical factors is very important to protect and promote the health of employees. The present study was conducted to determine hazard zones based on assessment of extremely low-frequency magnetic fields at electric substations of a petrochemical complex in southern Iran, using the single-axis HI-3604 device. In measurement of electromagnetic fields by the single-axis HI-3604 device, the sensor screen should be oriented in a way to be perpendicular to the field lines. Therefore, in places where power lines are located in different directions, it is required to keep the device towards three axes of x, y, and z. For further precision, the measurements should be repeated along each of the three axes. In this research, magnetic field was measured, for the first time, in three axes of x, y, and z whose resultant value was considered as the value of magnetic field. Measurements were done based on IEEE std 644-1994. Further, the spatial changes of the magnetic field surrounding electric substations were stimulated using MATLAB software. The obtained results indicated that the maximum magnetic flux density was 49.90 μT recorded from boiler substation, while the minimum magnetic flux density of 0.02 μT was measured at the control room of the complex. As the stimulation results suggest, the spaces around incoming panels, transformers, and cables were recognized as hazardous zones of indoor electric substations. Considering the health effects of chronic exposure to magnetic fields, it would be possible to minimize exposure to these contaminants at workplaces by identification of risky zones and observation of protective considerations. PMID:25877640

  13. Hazard zoning around electric substations of petrochemical industries by stimulation of extremely low-frequency magnetic fields.

    PubMed

    Hosseini, Monireh; Monazzam, Mohammad Reza; Farhang Matin, Laleh; Khosroabadi, Hossein

    2015-05-01

    Electromagnetic fields in recent years have been discussed as one of the occupational hazards at workplaces. Hence, control and assessment of these physical factors is very important to protect and promote the health of employees. The present study was conducted to determine hazard zones based on assessment of extremely low-frequency magnetic fields at electric substations of a petrochemical complex in southern Iran, using the single-axis HI-3604 device. In measurement of electromagnetic fields by the single-axis HI-3604 device, the sensor screen should be oriented in a way to be perpendicular to the field lines. Therefore, in places where power lines are located in different directions, it is required to keep the device towards three axes of x, y, and z. For further precision, the measurements should be repeated along each of the three axes. In this research, magnetic field was measured, for the first time, in three axes of x, y, and z whose resultant value was considered as the value of magnetic field. Measurements were done based on IEEE std 644-1994. Further, the spatial changes of the magnetic field surrounding electric substations were stimulated using MATLAB software. The obtained results indicated that the maximum magnetic flux density was 49.90 μT recorded from boiler substation, while the minimum magnetic flux density of 0.02 μT was measured at the control room of the complex. As the stimulation results suggest, the spaces around incoming panels, transformers, and cables were recognized as hazardous zones of indoor electric substations. Considering the health effects of chronic exposure to magnetic fields, it would be possible to minimize exposure to these contaminants at workplaces by identification of risky zones and observation of protective considerations.

  14. Assessment of the risk of failure of high voltage substations due to environmental conditions and pollution on insulators.

    PubMed

    Castillo Sierra, Rafael; Oviedo-Trespalacios, Oscar; Candelo, John E; Soto, Jose D

    2015-07-01

    Pollution on electrical insulators is one of the greatest causes of failure of substations subjected to high levels of salinity and environmental pollution. Considering leakage current as the main indicator of pollution on insulators, this paper focuses on establishing the effect of the environmental conditions on the risk of failure due to pollution on insulators and determining the significant change in the magnitude of the pollution on the insulators during dry and humid periods. Hierarchical segmentation analysis was used to establish the effect of environmental conditions on the risk of failure due to pollution on insulators. The Kruskal-Wallis test was utilized to determine the significant changes in the magnitude of the pollution due to climate periods. An important result was the discovery that leakage current was more common on insulators during dry periods than humid ones. There was also a higher risk of failure due to pollution during dry periods. During the humid period, various temperatures and wind directions produced a small change in the risk of failure. As a technical result, operators of electrical substations can now identify the cause of an increase in risk of failure due to pollution in the area. The research provides a contribution towards the behaviour of the leakage current under conditions similar to those of the Colombian Caribbean coast and how they affect the risk of failure of the substation due to pollution.

  15. A Fuzzy-Based Control Method for Smoothing Power Fluctuations in Substations along High-Speed Railways

    NASA Astrophysics Data System (ADS)

    Sugio, Tetsuya; Yamamoto, Masayoshi; Funabiki, Shigeyuki

    The use of an SMES (Superconducting Magnetic Energy Storage) for smoothing power fluctuations in a railway substation has been discussed. This paper proposes a smoothing control method based on fuzzy reasoning for reducing the SMES capacity at substations along high-speed railways. The proposed smoothing control method comprises three countermeasures for reduction of the SMES capacity. The first countermeasure involves modification of rule 1 for smoothing out the fluctuating electric power to its average value. The other countermeasures involve the modification of the central value of the stored energy control in the SMES and revision of the membership function in rule 2 for reduction of the SMES capacity. The SMES capacity in the proposed smoothing control method is reduced by 49.5% when compared to that in the nonrevised control method. It is confirmed by computer simulations that the proposed control method is suitable for smoothing out power fluctuations in substations along high-speed railways and for reducing the SMES capacity.

  16. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    SciTech Connect

    Maguire, James; McNamara, Joseph

    2010-06-25

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and

  17. Administrative Ecology

    ERIC Educational Resources Information Center

    McGarity, Augustus C., III; Maulding, Wanda

    2007-01-01

    This article discusses how all four facets of administrative ecology help dispel the claims about the "impossibility" of the superintendency. These are personal ecology, professional ecology, organizational ecology, and community ecology. Using today's superintendency as an administrative platform, current literature describes a preponderance of…

  18. Administrative Support.

    ERIC Educational Resources Information Center

    Doran, Dorothy; And Others

    This guide is intended to assist business education teachers in administrative support courses. The materials presented are based on the Arizona validated occupational competencies and tasks for the occupations of receptionist, secretary, and administrative assistant. Word processing skills have been infused into each of the three sections. The…

  19. ω to β Transformation in Group IV B Elements: Hugoniot Discontinuities and Relation with d Substates.

    NASA Astrophysics Data System (ADS)

    Joshi, K. D.; Jyoti, G.; Gupta, Satish C.; Sikka, S. K.

    2001-06-01

    The ω (hexagonal) to β (bcc) transformation in Zr and Hf occurs at 30 and 71 GPa under static pressures with corresponding Hugoniot discontinuities around 26 and 60 GPa. This transition has not been found in Ti up to 87 GPa. Our FP-LAPW calculations predict an ω-β transition in Ti around 118 GPa (V/V_o= 0.63) along isotherm. The temperatures near this compression estimated from our theoretical Hugoniot are much above its melting point suggesting that ω-β transition may not occur along the Hugoniot. The ω to β transition pressures, 118, 30 and 71 GPa for Ti, Zr and Hf, respectively, do not follow the trend implied by the principle of corresponding states. We have analysed the causes for this anomalous trend. We observe that the ω-β transition depends on how the increased d-poulation due to s-d transfer under pressure is distributed in the different d-substates. For example, at ambient condition, bcc phase is unstable and the difference between the average charges in the bcc stabilizing d-t_2g state and the destabilizing d-eg state are 0.008, 0.082 and 0.013 for Ti, Zr and Hf, respectively. Compression increases this difference and stablizes bcc structure when it becomes about 0.1. The charge transfer needed for stablizing β structure is highest for Ti followed by Hf and then Zr, in line with the trend in transition pressures.

  20. Simulation and study of power quality issues in a fixed speed wind farm substation.

    PubMed

    Magesh, T; Chellamuthu, C

    2015-01-01

    Power quality issues associated with the fixed speed wind farm substation located at Coimbatore district are investigated as the wind generators are tripping frequently. The investigations are carried out using two power quality analyzers, Fluke 435 and Dranetz PX5.8, with one of them connected at group control breaker of the 110 kV feeder and the other at the selected 0.69 kV generator busbar during the period of maximum power generation. From the analysis of the recorded data it is found that sag, swell, and transients are the major events which are responsible for the tripping of the generators. In the present study, simulation models for wind, turbine, shaft, pitch mechanism, induction generator, and grid are developed using DIgSILENT. Using the turbine characteristics, a two-dimensional lookup table is designed to generate a reference pitch angle necessary to simulate the power curve of the passive stall controlled wind turbine. Various scenarios and their effects on the performance of the wind farm are studied and validated with the recorded data and waveforms. The simulation model will be useful for the designers for planning and development of the wind farm before implementation.

  1. Simulation and study of power quality issues in a fixed speed wind farm substation.

    PubMed

    Magesh, T; Chellamuthu, C

    2015-01-01

    Power quality issues associated with the fixed speed wind farm substation located at Coimbatore district are investigated as the wind generators are tripping frequently. The investigations are carried out using two power quality analyzers, Fluke 435 and Dranetz PX5.8, with one of them connected at group control breaker of the 110 kV feeder and the other at the selected 0.69 kV generator busbar during the period of maximum power generation. From the analysis of the recorded data it is found that sag, swell, and transients are the major events which are responsible for the tripping of the generators. In the present study, simulation models for wind, turbine, shaft, pitch mechanism, induction generator, and grid are developed using DIgSILENT. Using the turbine characteristics, a two-dimensional lookup table is designed to generate a reference pitch angle necessary to simulate the power curve of the passive stall controlled wind turbine. Various scenarios and their effects on the performance of the wind farm are studied and validated with the recorded data and waveforms. The simulation model will be useful for the designers for planning and development of the wind farm before implementation. PMID:25950016

  2. Simulation and Study of Power Quality Issues in a Fixed Speed Wind Farm Substation

    PubMed Central

    Magesh, T.; Chellamuthu, C.

    2015-01-01

    Power quality issues associated with the fixed speed wind farm substation located at Coimbatore district are investigated as the wind generators are tripping frequently. The investigations are carried out using two power quality analyzers, Fluke 435 and Dranetz PX5.8, with one of them connected at group control breaker of the 110 kV feeder and the other at the selected 0.69 kV generator busbar during the period of maximum power generation. From the analysis of the recorded data it is found that sag, swell, and transients are the major events which are responsible for the tripping of the generators. In the present study, simulation models for wind, turbine, shaft, pitch mechanism, induction generator, and grid are developed using DIgSILENT. Using the turbine characteristics, a two-dimensional lookup table is designed to generate a reference pitch angle necessary to simulate the power curve of the passive stall controlled wind turbine. Various scenarios and their effects on the performance of the wind farm are studied and validated with the recorded data and waveforms. The simulation model will be useful for the designers for planning and development of the wind farm before implementation. PMID:25950016

  3. Southwestern Power Administration annual site environmental report CY 1997

    SciTech Connect

    1998-11-01

    This report provides a synopsis of Southwestern Power Administration`s (Southwestern`s) effectiveness in managing its operations in an environmentally responsible manner. In CY 1997, the Office of Environmental, Safety, and Health was reorganized and incorporated into the Division of Acquisition and Property. The Division of Acquisition, Property, and Environmental Management maintains responsibility for development, oversight, and implementation of environmental programs. Senior Management at Southwestern has taken actions to increase environmental awareness throughout the organization. During CY 1997, (Southwestern) was not involved in any known programs or activities that had adverse impacts on the environment. The 1997 Environmental Appraisal, a portion of Southwestern`s Self-Assessment and Appraisal Program, indicated approximately 90% compliance with Southwestern`s written environmental programs. Southwestern continued to function throughout CY 1997 in an operations and maintenance posture with minor substation projects.

  4. Measurement of the magnetic fields of high-voltage substations (230 kV) in Tehran (Iran) and comparison with the ACGIH threshold limit values.

    PubMed

    Fard, Mahdieh Sharifi; Nasiri, Parvin; Monazzam, Mohammad Reza

    2011-06-01

    Measurements were made according to IEEE standard 644-1994 at a height of 1 m above floor level. It is concluded that none of the measurements exceeded the ACGIH threshold limit value. Among all control rooms the highest measured density amount is 0.69 μT in the control room of Ozgol substation and the lowest is 0.2 μT in the post of Shahid Firouzi. The control room of Ozgol substation is located in the second floor and bus-bars are located at a short distance from the window on the east, and so the highest recorded magnetic field is measured in this control room. Among all switchgear parts the highest amount 9.15 μT is measured in Kan substation. None of the measurements exceeded the ACGIH threshold limit value. PMID:21131660

  5. Measurement of the magnetic fields of high-voltage substations (230 kV) in Tehran (Iran) and comparison with the ACGIH threshold limit values.

    PubMed

    Fard, Mahdieh Sharifi; Nasiri, Parvin; Monazzam, Mohammad Reza

    2011-06-01

    Measurements were made according to IEEE standard 644-1994 at a height of 1 m above floor level. It is concluded that none of the measurements exceeded the ACGIH threshold limit value. Among all control rooms the highest measured density amount is 0.69 μT in the control room of Ozgol substation and the lowest is 0.2 μT in the post of Shahid Firouzi. The control room of Ozgol substation is located in the second floor and bus-bars are located at a short distance from the window on the east, and so the highest recorded magnetic field is measured in this control room. Among all switchgear parts the highest amount 9.15 μT is measured in Kan substation. None of the measurements exceeded the ACGIH threshold limit value.

  6. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  7. Administrative IT

    ERIC Educational Resources Information Center

    Grayson, Katherine, Ed.

    2006-01-01

    When it comes to Administrative IT solutions and processes, best practices range across the spectrum. Enterprise resource planning (ERP), student information systems (SIS), and tech support are prominent and continuing areas of focus. But widespread change can also be accomplished via the implementation of campuswide document imaging and sharing,…

  8. Database Administrator

    ERIC Educational Resources Information Center

    Moore, Pam

    2010-01-01

    The Internet and electronic commerce (e-commerce) generate lots of data. Data must be stored, organized, and managed. Database administrators, or DBAs, work with database software to find ways to do this. They identify user needs, set up computer databases, and test systems. They ensure that systems perform as they should and add people to the…

  9. ADMINISTRATIVE CLIMATE.

    ERIC Educational Resources Information Center

    BRUCE, ROBERT L.; CARTER, G.L., JR.

    IN THE COOPERATIVE EXTENSION SERVICE, STYLES OF LEADERSHIP PROFOUNDLY AFFECT THE QUALITY OF THE SERVICE RENDERED. ACCORDINGLY, MAJOR INFLUENCES ON ADMINISTRATIVE CLIMATE AND EMPLOYEE PRODUCTIVITY ARE EXAMINED IN ESSAYS ON (1) SOURCES OF JOB SATISFACTION AND DISSATISFACTION, (2) MOTIVATIONAL THEORIES BASED ON JOB-RELATED SATISFACTIONS AND NEEDS,…

  10. Engineering Administration.

    ERIC Educational Resources Information Center

    Naval Personnel Program Support Activity, Washington, DC.

    This book is intended to acquaint naval engineering officers with their duties in the engineering department. Standard shipboard organizations are analyzed in connection with personnel assignments, division operations, and watch systems. Detailed descriptions are included for the administration of directives, ship's bills, damage control, training…

  11. Southwestern Power Administration Annual Report 2010

    SciTech Connect

    2012-09-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  12. Southwestern Power Administration Annual Report 2012

    SciTech Connect

    2013-09-01

    Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  13. Southwestern Power Administration Annual Report 2011

    SciTech Connect

    2013-04-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  14. A residue substitution near the beta-ionone ring of the retinal affects the M substates of bacteriorhodopsin

    NASA Technical Reports Server (NTRS)

    Varo, G.; Zimanyi, L.; Chang, M.; Ni, B.; Needleman, R.; Lanyi, J. K.

    1992-01-01

    The switch in the bacteriorhodopsin photocycle, which reorients access of the retinal Schiff base from the extracellular to the cytoplasmic side, was suggested to be an M1----M2 reaction (Varo and Lanyi. 1991. Biochemistry. 30:5008-5015, 5016-5022). Thus, in this light-driven proton pump it is the interconversion of proposed M substates that gives direction to the transport. We find that in monomeric, although not purple membrane-lattice immobilized, D115N bacteriorhodopsin, the absorption maximum of M changes during the photocycle: in the time domain between its rise and decay it shifts 15 nm to the blue relative to the spectrum at earlier times. This large shift strongly supports the existence of two M substates. Since D115 is located near the beta-ionone ring of the retinal, the result raises questions about the possible involvement of the retinal chain or protein residues as far away as 10 A from the Schiff base in the mechanism of the switching reaction.

  15. A practical approach in substation capacitor bank applications to calculating, limiting, and reducing the effects of transient currents

    SciTech Connect

    Smith, L.M.

    1995-07-01

    When two or more capacitor banks are in parallel on a common bus, the back-to-back switching of a bank against one or more already energized banks can produce high peak transient in-rush current values. Typically, these currents can exceed the available fault current levels previously present at the bus. The presence of inductance and capacitance together makes the transients oscillatory. Because of close circuit coupling, the transient frequency is generally several kilohertz or higher and usually decays to zero in a fraction of a 60-Hz cycle. The relatively high level and short duration of these currents can damage substation and control equipment necessitating that appropriate precautions be taken during the design process. This paper explores the methods for estimating capacitor bank transient currents, based on ANSI/IEEE C37.012-1979, for various sizes, voltages, and configurations of real world capacitor bank installations. Also discussed are the various accepted and applied methods for limiting substation equipment susceptibility to transients, as well as reducing the magnitude of the transients themselves.

  16. Characterization of the conformational equilibrium between the two major substates of RNase A using NMR chemical shifts.

    PubMed

    Camilloni, Carlo; Robustelli, Paul; De Simone, Alfonso; Cavalli, Andrea; Vendruscolo, Michele

    2012-03-01

    Following the recognition that NMR chemical shifts can be used for protein structure determination, rapid advances have recently been made in methods for extending this strategy for proteins and protein complexes of increasing size and complexity. A remaining major challenge is to develop approaches to exploit the information contained in the chemical shifts about conformational fluctuations in native states of proteins. In this work we show that it is possible to determine an ensemble of conformations representing the free energy surface of RNase A using chemical shifts as replica-averaged restraints in molecular dynamics simulations. Analysis of this surface indicates that chemical shifts can be used to characterize the conformational equilibrium between the two major substates of this protein.

  17. A New Approach to Detection of Systematic Errors in Secondary Substation Monitoring Equipment Based on Short Term Load Forecasting.

    PubMed

    Moriano, Javier; Rodríguez, Francisco Javier; Martín, Pedro; Jiménez, Jose Antonio; Vuksanovic, Branislav

    2016-01-12

    In recent years, Secondary Substations (SSs) are being provided with equipment that allows their full management. This is particularly useful not only for monitoring and planning purposes but also for detecting erroneous measurements, which could negatively affect the performance of the SS. On the other hand, load forecasting is extremely important since they help electricity companies to make crucial decisions regarding purchasing and generating electric power, load switching, and infrastructure development. In this regard, Short Term Load Forecasting (STLF) allows the electric power load to be predicted over an interval ranging from one hour to one week. However, important issues concerning error detection by employing STLF has not been specifically addressed until now. This paper proposes a novel STLF-based approach to the detection of gain and offset errors introduced by the measurement equipment. The implemented system has been tested against real power load data provided by electricity suppliers. Different gain and offset error levels are successfully detected.

  18. A New Approach to Detection of Systematic Errors in Secondary Substation Monitoring Equipment Based on Short Term Load Forecasting

    PubMed Central

    Moriano, Javier; Rodríguez, Francisco Javier; Martín, Pedro; Jiménez, Jose Antonio; Vuksanovic, Branislav

    2016-01-01

    In recent years, Secondary Substations (SSs) are being provided with equipment that allows their full management. This is particularly useful not only for monitoring and planning purposes but also for detecting erroneous measurements, which could negatively affect the performance of the SS. On the other hand, load forecasting is extremely important since they help electricity companies to make crucial decisions regarding purchasing and generating electric power, load switching, and infrastructure development. In this regard, Short Term Load Forecasting (STLF) allows the electric power load to be predicted over an interval ranging from one hour to one week. However, important issues concerning error detection by employing STLF has not been specifically addressed until now. This paper proposes a novel STLF-based approach to the detection of gain and offset errors introduced by the measurement equipment. The implemented system has been tested against real power load data provided by electricity suppliers. Different gain and offset error levels are successfully detected. PMID:26771613

  19. Bonneville Power Administration 1991 site environmental report

    SciTech Connect

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  20. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  1. Southwestern Power Administration Annual Report 2008

    SciTech Connect

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  2. A Comparative Study of Electric Load Curve Changes in an Urban Low-Voltage Substation in Spain during the Economic Crisis (2008–2013)

    PubMed Central

    Lara-Santillán, Pedro M.; Mendoza-Villena, Montserrat; Fernández-Jiménez, L. Alfredo; Mañana-Canteli, Mario

    2014-01-01

    This paper presents a comparative study of the electricity consumption (EC) in an urban low-voltage substation before and during the economic crisis (2008–2013). This low-voltage substation supplies electric power to near 400 users. The EC was measured for an 11-year period (2002–2012) with a sampling time of 1 minute. The study described in the paper consists of detecting the changes produced in the load curves of this substation along the time due to changes in the behaviour of consumers. The EC was compared using representative curves per time period (precrisis and crisis). These representative curves were obtained after a computational process, which was based on a search for days with similar curves to the curve of a determined (base) date. This similitude was assessed by the proximity on the calendar, day of the week, daylight time, and outdoor temperature. The last selection parameter was the error between the nearest neighbour curves and the base date curve. The obtained representative curves were linearized to determine changes in their structure (maximum and minimum consumption values, duration of the daily time slot, etc.). The results primarily indicate an increase in the EC in the night slot during the summer months in the crisis period. PMID:24895677

  3. A comparative study of electric load curve changes in an urban low-voltage substation in Spain during the economic crisis (2008-2013).

    PubMed

    Lara-Santillán, Pedro M; Mendoza-Villena, Montserrat; Fernández-Jiménez, L Alfredo; Mañana-Canteli, Mario

    2014-01-01

    This paper presents a comparative study of the electricity consumption (EC) in an urban low-voltage substation before and during the economic crisis (2008-2013). This low-voltage substation supplies electric power to near 400 users. The EC was measured for an 11-year period (2002-2012) with a sampling time of 1 minute. The study described in the paper consists of detecting the changes produced in the load curves of this substation along the time due to changes in the behaviour of consumers. The EC was compared using representative curves per time period (precrisis and crisis). These representative curves were obtained after a computational process, which was based on a search for days with similar curves to the curve of a determined (base) date. This similitude was assessed by the proximity on the calendar, day of the week, daylight time, and outdoor temperature. The last selection parameter was the error between the nearest neighbour curves and the base date curve. The obtained representative curves were linearized to determine changes in their structure (maximum and minimum consumption values, duration of the daily time slot, etc.). The results primarily indicate an increase in the EC in the night slot during the summer months in the crisis period.

  4. Conformational substates of calmodulin revealed by single-pair fluorescence resonance energy transfer: influence of solution conditions and oxidative modification.

    PubMed

    Slaughter, Brian D; Unruh, Jay R; Allen, Michael W; Bieber Urbauer, Ramona J; Johnson, Carey K

    2005-03-15

    A calmodulin (CaM) mutant (T34,110C-CaM) doubly labeled with fluorescence probes AlexaFluor 488 and Texas Red in opposing domains (CaM-DA) has been used to examine conformational heterogeneity in CaM by single-pair fluorescence resonance energy transfer (spFRET). Burst-integrated FRET efficiencies of freely diffusing CaM-DA single molecules yielded distributions of distance between domains of CaM-DA. We recently reported distinct conformational substates of Ca(2+)-CaM-DA and apoCaM-DA, with peaks in the distance distributions centered at approximately 28 A, 34-38 A, and 55 A [Slaughter et al. (2004) J. Phys. Chem. B 108, 10388-10397]. In the present study, shifts in the amplitudes and center distances of the conformational substates were detected with variation in solution conditions. The amplitude of an extended conformation was observed to change as a function of Ca(2+) over a free Ca(2+) range that is consistent with binding to the high affinity, C-terminal Ca(2+) binding sites, suggesting the existence of communication between lobes of CaM. Lowering pH shifted the relative amplitudes of the conformations, with a marked increase in the presence of the compact conformations and an almost complete absence of the extended conformation. In addition, the single-molecule distance distribution of apoCaM-DA at reduced ionic strength was shifted to longer distance and showed evidence of an increase in conformational heterogeneity relative to apoCaM-DA at physiological ionic strength. Oxidation of methionine residues in CaM-DA produced a substantial increase in the amplitude of the extended conformation relative to the more compact conformation. The results are considered in light of a hypothesis that suggests that electrostatic interactions between charged amino acid side chains play an important role in determining the most stable CaM conformation under varying solution conditions.

  5. Segmentation of planar surfaces in LiDAR point clouds of an electrical substation by exploring the structure of points neighbourhood

    NASA Astrophysics Data System (ADS)

    Arastounia, M.; Lichti, D. D.

    2014-06-01

    According to the Department of Energy of the USA, today's electrical distribution system is 97.97% reliable. However, power outages and interruptions still impact many people. Many power outages are caused by animals coming into contact with the conductive elements of the electrical substations. This can be prevented by covering the conductive electrical objects with insulating materials. The design of these custom-built insulating covers requires a 3D as-built plan of the substation. This research aims to develop automated methods to create such a 3D as-built plan using terrestrial LiDAR data for which objects first need to be recognized in the LiDAR point clouds. This paper reports on the application of a new algorithm for the segmentation of planar surfaces found at electrical substations. The proposed approach is a region growing method that aggregates points based on their proximity to each other and their neighbourhood dispersion direction. PCA (principal components analysis) is also employed to segment planar surfaces in the electrical substation. In this research two different laser scanners, Leica HDS 6100 and Faro Focus3D, were utilized to scan an electrical substation in Airdrie, a city located in north of Calgary, Canada. In this research, three subsets incorporating one subset of Leica dataset with approximately 1.7 million points and two subsets of the Faro dataset with 587 and 79 thousand points were utilized. The performance of our proposed method is compared with the performance of PCA by performing check point analysis and investigation of computational speed. Both methods managed to detect a great proportion of planar points (about 70%). However, the proposed method slightly outperformed PCA. 95% of the points that were segmented by both methods as planar points did actually lie on a planar surface. This exhibits the high ability of both methods to identify planar points. The results also indicate that the computational speed of our method is

  6. Senior Administrators Should Have Administrative Contracts.

    ERIC Educational Resources Information Center

    Posner, Gary J.

    1987-01-01

    Recognizing that termination is viewed by the employee as the equivalent to capital punishment of a career, an administrative contract can reduce the emotional and financial entanglements that often result. Administrative contracts are described. (MLW)

  7. Examples of occupational exposure to electric and magnetic fields at 110-kV gas-insulated substations (GISs).

    PubMed

    Korpinen, Leena; Pääkkönen, Rauno

    2015-02-01

    The objectives of the study were to present examples of occupational exposure to electric and magnetic fields at gas-insulated substations (GISs) and to analyse the exposure according to the new European Directive 2013/35/EU. The aim was also to describe the details of the measurements of this study at GISs. Electric and magnetic fields were measured (45 measurements in total) at two GISs in the Tampere region of Finland. Inside the GISs, magnetic field values varied from 0.4 to 43.0 µT, and electric fields from 5 to 90 V m(-1). In the cable room of GIS B, the maximum value was 250 µT (very near the cables). The values did not exceed the low or high action levels of the new Directive 2013/35/EU. In conclusion, it can be stated that at 110-kV GISs, workers are not exposed to electromagnetic fields (EMFs) higher than the new European Directive 2013/35/EU. PMID:24966339

  8. Transportation Security Administration

    MedlinePlus

    ... content Official website of the Department of Homeland Security Transportation Security Administration A - Z Index What Can I Bring? Search form Apples Main menu Administrator Travel Security Screening Special Procedures TSA Pre✓® Passenger Support Travel ...

  9. NASA, NOAA administrators nominated

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    President Ronald Reagan recently said he intended to nominate James Montgomery Beggs as NASA Administrator and John V. Byrne as NOAA Administrator. These two positions are key scientific posts that have been vacant since the start of the Reagan administration on January 20. The President also said he intends to nominate Hans Mark as NASA Deputy Administrator. At press time, Reagan had not designated his nominee for the director of the Office of Science and Technology Policy.

  10. A Philosophy of Administration.

    ERIC Educational Resources Information Center

    Bruening, William H.

    Justification is given for paying relatively large salaries to college administrators, specifically the president or chancellor and the chief academic officer. Three administrative task areas are discussed as criteria: management, administration per se, and leadership. It is contended that only leadership can be used as a criterion for…

  11. Veterans Administration Databases

    Cancer.gov

    The Veterans Administration Information Resource Center provides database and informatics experts, customer service, expert advice, information products, and web technology to VA researchers and others.

  12. Effects of aging on the structural, mechanical, and thermal properties of the silicone rubber current transformer insulation bushing for a 500 kV substation.

    PubMed

    Wang, Zhigao; Zhang, Xinghai; Wang, Fangqiang; Lan, Xinsheng; Zhou, Yiqian

    2016-01-01

    In order to analyze the cracking and aging reason of the silicone rubber current transformer (CT) insulation bushing used for 8 years from a 500 kV alternating current substation, characteristics including Fourier transform infrared (FTIR) spectroscopy, mechanical properties analysis, hardness, and thermo gravimetric analysis have been carried out. The FTIR results indicated that the external surface of the silicone rubber CT insulation bushing suffered from more serious aging than the internal part, fracture of side chain Si-C bond was much more than the backbone. Mechanical properties and thermal stability results illustrated that the main aging reasons were the breakage of side chain Si-C bond and the excessive cross-linking reaction of the backbone. This study can provide valuable basis for evaluating degradation mechanism and aging state of the silicone rubber insulation bushing in electric power field.

  13. Effects of aging on the structural, mechanical, and thermal properties of the silicone rubber current transformer insulation bushing for a 500 kV substation.

    PubMed

    Wang, Zhigao; Zhang, Xinghai; Wang, Fangqiang; Lan, Xinsheng; Zhou, Yiqian

    2016-01-01

    In order to analyze the cracking and aging reason of the silicone rubber current transformer (CT) insulation bushing used for 8 years from a 500 kV alternating current substation, characteristics including Fourier transform infrared (FTIR) spectroscopy, mechanical properties analysis, hardness, and thermo gravimetric analysis have been carried out. The FTIR results indicated that the external surface of the silicone rubber CT insulation bushing suffered from more serious aging than the internal part, fracture of side chain Si-C bond was much more than the backbone. Mechanical properties and thermal stability results illustrated that the main aging reasons were the breakage of side chain Si-C bond and the excessive cross-linking reaction of the backbone. This study can provide valuable basis for evaluating degradation mechanism and aging state of the silicone rubber insulation bushing in electric power field. PMID:27390631

  14. Two-dimensional vibrational spectroscopy of the amide I band of crystalline acetanilide: Fermi resonance, conformational substates, or vibrational self-trapping?

    NASA Astrophysics Data System (ADS)

    Edler, J.; Hamm, P.

    2003-08-01

    Two-dimensional infrared (2D-IR) spectroscopy is applied to investigate acetanilide, a molecular crystal consisting of quasi-one-dimensional hydrogen bonded peptide units. The amide-I band exhibits a double peak structure, which has been attributed to different mechanisms including vibrational self-trapping, a Fermi resonance, or the existence of two conformational substates. The 2D-IR spectrum of crystalline acetanilide is compared with that of two different molecular systems: (i) benzoylchloride, which exhibits a strong symmetric Fermi resonance and (ii) N-methylacetamide dissolved in methanol which occurs in two spectroscopically distinguishable conformations. Both 2D-IR spectra differ significantly from that of crystalline acetanilide, proving that these two alternative mechanisms cannot account for the anomalous spectroscopy of crystalline acetanilide. On the other hand, vibrational self-trapping of the amide-I band can naturally explain the 2D-IR response.

  15. The Administrative Power Grab

    ERIC Educational Resources Information Center

    Sorenson, Richard D.

    2007-01-01

    Administrative power for some school teachers can be an aphrodisiac that can be applied negatively, especially when a leader has devastating instinct for the weaknesses of others. A leader's intellect and heart closes shop and ceases to function when drunk on power. In this article, the author describes how the use of administrative power can be…

  16. Innovation in Administrator Preparation.

    ERIC Educational Resources Information Center

    Coleman, Don

    An innovative administrator preparation program based on guidelines established by national boards and commissions is described in this paper. The California State University, Fresno, administrator education curriculum was reorganized by faculty and an advisory committee of 11 superintendents to meet the needs of local school districts. The…

  17. Migrant Education Administrative Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    Relating specifically to the North Carolina migrant education program's administrative responsibilities, this guide is designed to aid administrators in program management, monitoring project activities, project evaluation, self-assessment, determining needs for training and staff development, site-visit preparation, policy development, and…

  18. Administration of Computer Resources.

    ERIC Educational Resources Information Center

    Franklin, Gene F.

    Computing at Stanford University has, until recently, been performed at one of five facilities. The Stanford hospital operates an IBM 370/135 mainly for administrative use. The university business office has an IBM 370/145 for its administrative needs and support of the medical clinic. Under the supervision of the Stanford Computation Center are…

  19. Issues in Educational Administration.

    ERIC Educational Resources Information Center

    Ediger, Marlow

    School administrators need to study and analyze the pros and cons of issues before making decisions. Ultimately, decisions need to be made by administrators as to which philosophies of education to implement in resolving conflicting points of view. More research studies would lead to an increased number of syntheses of the pros and cons of certain…

  20. Justifying Educational Administration.

    ERIC Educational Resources Information Center

    Evers, Colin; Lakomski, Gabriele

    1993-01-01

    The traditional conceptions of science dominating educational administration are mistaken. Unacceptable epistemologies, like those implicit in logical positivism, justify knowledge solely in terms of empirical adequacy. An improved science of educational administration embraces a coherent global theory accounting for all the phenomena of human…

  1. Test Administration Models

    ERIC Educational Resources Information Center

    Becker, Kirk A.; Bergstrom, Betty A.

    2013-01-01

    The need for increased exam security, improved test formats, more flexible scheduling, better measurement, and more efficient administrative processes has caused testing agencies to consider converting the administration of their exams from paper-and-pencil to computer-based testing (CBT). Many decisions must be made in order to provide an optimal…

  2. Champions of Children. Administrators . . .

    ERIC Educational Resources Information Center

    Chaffee, John; Olds, H. Robert

    Today, in an era of taxpayer revolts, lack of clarity in values, and changing family structure, children need advocates in the political arena as well as in the schools. This pamphlet suggests that administrators are in an excellent position to defend the rights of children on all fronts. It focuses on what administrators have done and specific…

  3. The School Personnel Administrator.

    ERIC Educational Resources Information Center

    Knox, Rodney F.

    This paper provides an overview of the development of the school-personnel administrator role. It first describes the influence of the science-management and human-relations movements and the behavioral sciences on personnel administration and human resource management. It next discusses the role of the personnel-performance-appraisal system and…

  4. Tenure for Administrators?

    ERIC Educational Resources Information Center

    Holyer, Robert

    2004-01-01

    The practice of granting tenure to academic administrators, especially presidents and academic deans, seems fairly prevalent. However, it is important to consider the possible advantages and disadvantages carefully before making such an offer. Boards interested in attracting talented administrators empowered to do what is in the best interest of…

  5. 47 CFR 54.715 - Administrative expenses of the Administrator.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Administrative expenses of the Administrator. 54.715 Section 54.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Administration § 54.715 Administrative expenses of the Administrator. (a) The annual administrative expenses...

  6. Thoughts for New Administrators

    ERIC Educational Resources Information Center

    LaCrosse, E. Robert

    1977-01-01

    Discusses issues in program administration, with specific reference to preschool programs. Some of the issues discussed include coping with conflict, leadership, the sharing of power, and honesty. A short annotated bibliography is included. (BD)

  7. Evaluation of Administrators.

    ERIC Educational Resources Information Center

    Ryan, Edmund G.

    1979-01-01

    Guidelines are presented for the evaluation of college administrators: (1) purposes of the evaluation; (2) approaches to evaluation; (3) criteria for evaluation; (4) participants or evaluators in the process; and (5) evaluation results and use of results. (GDC)

  8. Serving the Space Administration

    ERIC Educational Resources Information Center

    Campbell, Jack E.; Thompson, Arthur W.

    1974-01-01

    The purpose of the current program was to establish an upward mobility program that afforded employees an opportunity to improve their credibility in job opportunity selection under the directives of the National Aeronautics and Space Administration. (Author/RK)

  9. Goldstone (GDSCC) administrative computing

    NASA Technical Reports Server (NTRS)

    Martin, H.

    1981-01-01

    The GDSCC Data Processing Unit provides various administrative computing services for Goldstone. Those activities, including finance, manpower and station utilization, deep-space station scheduling and engineering change order (ECO) control are discussed.

  10. Administrators Speak Out

    ERIC Educational Resources Information Center

    Miner, Fred V.

    1976-01-01

    A summary is presented of the issues and concerns discussed and the recommendations made by the American Vocational Association's (AVA) Administration Policy Committee during its meeting at the 1975 AVA Convention. (AJ)

  11. MCS Systems Administration Toolkit

    2001-09-30

    This package contains a number of systems administration utilities to assist a team of system administrators in managing a computer environment by automating routine tasks and centralizing information. Included are utilities to help install software on a network of computers and programs to make an image of a disk drive, to manage and distribute configuration files for a number of systems, and to run self-testss on systems, as well as an example of using amore » database to manage host information and various utilities.« less

  12. Computer hardware fault administration

    DOEpatents

    Archer, Charles J.; Megerian, Mark G.; Ratterman, Joseph D.; Smith, Brian E.

    2010-09-14

    Computer hardware fault administration carried out in a parallel computer, where the parallel computer includes a plurality of compute nodes. The compute nodes are coupled for data communications by at least two independent data communications networks, where each data communications network includes data communications links connected to the compute nodes. Typical embodiments carry out hardware fault administration by identifying a location of a defective link in the first data communications network of the parallel computer and routing communications data around the defective link through the second data communications network of the parallel computer.

  13. River basin administration

    NASA Astrophysics Data System (ADS)

    Management of international rivers and their basins is the focus of the Centre for Comparative Studies on (International) River Basin Administration, recently established at Delft University of Technology in the Netherlands. Water pollution, sludge, and conflicting interests in the use of water in upstream and downstream parts of a river basin will be addressed by studying groundwater and consumption of water in the whole catchment area of a river.Important aspects of river management are administrative and policy aspects. The Centre will focus on policy, law, planning, and organization, including transboundary cooperation, posing standards, integrated environmental planning on regional scale and environmental impact assessments.

  14. Urban School Administration.

    ERIC Educational Resources Information Center

    McKelvey, Troy V., Ed.; Swanson, Austin D., Ed.

    This document contains 12 papers presented at an institute for urban school administrators designed to deal with the contemporary urban educational problems incident to school desegregation, social integration, and the equality of educational opportunity. The authors of the papers relate recent research findings to practical field experience, and…

  15. Telecommunications administration standard

    SciTech Connect

    Gustwiller, K.D.

    1996-05-01

    The administration of telecommunications is critical to proper maintenance and operation. The intent is to be able to properly support telecommunications for the distribution of all information within a building/campus. This standard will provide a uniform administration scheme that is independent of applications, and will establish guidelines for owners, installers, designers and contractors. This standard will accommodate existing building wiring, new building wiring and outside plant wiring. Existing buildings may not readily adapt to all applications of this standard, but the requirement for telecommunications administration is applicable to all buildings. Administration of the telecommunications infrastructure includes documentation (labels, records, drawings, reports, and work orders) of cables, termination hardware, patching and cross-connect facilities, telecommunications rooms, and other telecommunications spaces (conduits, grounding, and cable pathways are documented by Facilities Engineering). The investment in properly documenting telecommunications is a worthwhile effort. It is necessary to adhere to these standards to ensure quality and efficiency for the operation and maintenance of the telecommunications infrastructure for Sandia National Laboratories.

  16. Hospital Library Administration.

    ERIC Educational Resources Information Center

    Cramer, Anne

    The objectives of a hospital are to improve patient care, while the objectives of a hospital library are to improve services to the staff which will support their efforts. This handbook dealing with hospital administration is designed to aid the librarian in either implementing a hospital library, or improving services in an existing medical…

  17. Administrative Salary Summary Data.

    ERIC Educational Resources Information Center

    Colorado Commission on Higher Education, Denver.

    This report presents salary data on selected administrative positions from all public higher education institutions, governing boards, and other higher education state-level agencies in Colorado. Table 1 presents, by institutional type, the median and mean salaries for 1994-95, as well as the frequency and range of salaries, for the following…

  18. A Treatise on Administration.

    ERIC Educational Resources Information Center

    Moore, Thomas R.

    1988-01-01

    Expands Henri Fayol's definition of the administrative process to include a humanistic approach involving planning, organizing, implementing, controlling, evaluating, and satisfying functions. This empirical definition differs from some theoretical approaches by looking beyond resource consumption to consider ecological effects on the environment…

  19. Guidebook for School Administrators.

    ERIC Educational Resources Information Center

    Hess, Fritz, Ed.

    To provide guidance and advice regarding day-to-day responsibilities of new and experienced school administrators and superintendents in New York State, this compendium of knowledge and advice submitted by practitioners is presented with emphasis on all major aspects of superintendency. The section on general aspects of superintendency includes…

  20. Administrators Confront Student "Sexting"

    ERIC Educational Resources Information Center

    Manzo, Kathleen Kennedy

    2009-01-01

    Cellphone-savvy students have created instructional and disciplinary challenges for educators for years. But the recent emergence of "sexting" by adolescents over their mobile phones caught many school administrators off guard, and the practice is prompting efforts around the country to craft policy responses. Students' sharing of nude or…

  1. IVA: Improving Vocational Administration.

    ERIC Educational Resources Information Center

    EPD Consortium D, Richardson, TX.

    These six instructional units are intended to provide instructors of vocational education administration with a systematic package of materials for their programs of preservice and/or inservice instruction and to provide materials which could be reproduced for learner use. These units cover the following subject matter: (1) federal legislation…

  2. Administrative Utility Analysis: Appendices.

    ERIC Educational Resources Information Center

    Peat, Marwick, Mitchell and Co., San Juan, Puerto Rico.

    Appendixes to a study on administrative utility analysis and vocational education programs for the Area of Vocational and Technical Education (AVTE) in the Puerto Rico Department of Education contain the planning and budgeting system elements, position descriptions, and information on the growth of vocational education in Puerto Rico. The elements…

  3. Standards and Administration.

    ERIC Educational Resources Information Center

    Gross, S. P.

    1978-01-01

    Presents a literature review of water quality standards and administration, covering publications of 1976-77. Consideration is given to municipal facilities, National Pollutant Discharge Elimination Systems, regional and international water quality management, and effluent standards. A list of 99 references is also presented. (HM)

  4. Research Administration: Lessons Learned.

    ERIC Educational Resources Information Center

    Dummer, George H.

    1995-01-01

    The ways in which accountability issues have affected federal-university relationships, particularly in the area of academic research, are examined. Lessons university administrators have learned since issuance of Office of Management and Budget Circular A-21 in 1958, Congressional hearings on the operations of the National Institutes of Health…

  5. Educational Administration's Weber.

    ERIC Educational Resources Information Center

    Gronn, Peter

    1994-01-01

    Discusses Max Weber's importance in Greenfield's work, particularly in Greenfield and Ribbins'"Greenfield on Educational Administration" (1993). In concentrating on human actors' subjective understanding, Greenfield was a faithful Weberian. However, he deviated from Weber by disavowing structural explanations of social and organizational…

  6. Administrative Uses of Microcomputers.

    ERIC Educational Resources Information Center

    Crawford, Chase

    1987-01-01

    This paper examines the administrative uses of the microcomputer, stating that high performance educational managers are likely to have microcomputers in their organizations. Four situations that would justify the use of a computer are: (1) when massive amounts of data are processed through well-defined operations; (2) when data processing is…

  7. Educator Effectiveness Administrative Manual

    ERIC Educational Resources Information Center

    Pennsylvania Department of Education, 2014

    2014-01-01

    The goal of this manual is to provide guidance in the evaluation of educators, highlight critical components of effectiveness training, and offer opportunities for professional growth. The term "educator" includes teachers, all professional and temporary professional employees, education specialists, and school administrators/principals.…

  8. Discretionary Grants Administration Manual.

    ERIC Educational Resources Information Center

    Office of Human Development Services (DHHS), Washington, DC.

    This manual sets forth applicable administrative policies and procedures to recipients of discretionary project grants or cooperative agreements awarded by program offices in the Office of Human Development Services (HDS). It is intended to serve as a basic reference for project directors and business officers of recipient organizations who are…

  9. Study Shows Administrative Shortage.

    ERIC Educational Resources Information Center

    Sullivan, John R., Jr.

    1989-01-01

    Summarizes "Administrative Shortage in New England: The Evidence, the Causes, the Recommendations." High pressure, long hours, low salaries, and high housing costs are among the reasons cited for the shortage. Recommendations are centered on role identity, staff support, training, and recruitment. (SI)

  10. Professionalism in Educational Administration.

    ERIC Educational Resources Information Center

    Silver, Paula F.

    That the quest for a general theory of educational administration has been a misdirection of effort and that the advancement of professionalism within this field would represent a more sensible endeavor for the production of useful knowledge is the focus of this essay. The advancement of professionalism would entail a reorientation of research…

  11. Public Relations for Administrators.

    ERIC Educational Resources Information Center

    Bagin, Don; And Others

    This volume provides information and recommendations about public relations to assist school administrators in developing effective communication. The document contains 15 chapters. "The Scope of Public Relations," chapter 1, specifies characteristics of and individuals responsible for an effective program. Chapter 2, "Personal Public Relations,"…

  12. Championing the Latino Administrator

    ERIC Educational Resources Information Center

    Garcia, Carlos A.

    2011-01-01

    When the author worked as a vice principal at a K-8 school in Watsonville, California, a school predominantly filled with migrant workers' children, he felt a lack of support as a Latino as he began moving up into school administration. He also continued to see what he had seen as a teacher--which was how underserved minority students were. These…

  13. Indicators of Administrative Effectiveness.

    ERIC Educational Resources Information Center

    Skipper, Charles E.; Hofmann, Richard J.

    Ten personal characteristics and seven administrative skills that differentiated effective from ineffective university leaders were assessed by multiple discriminate analysis. The personal characteristics identified by previous research (Skipper, 1975, 1977) are: responsibility, integrity, self-control, intellectual efficiency, flexibility,…

  14. Migrant Education Administrative Handbook.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Bureau of Migrant Education.

    Intended to provide information pertaining to the administration of migrant education projects in Louisiana, the handbook is divided into two sections: basic guidelines for program operations and support services--nursing. Section I covers the Federal and State migrant program, local migrant projects, project personnel and staff development, and…

  15. Redis database administration tool

    SciTech Connect

    Martinez, J. J.

    2013-02-13

    MyRedis is a product of the Lorenz subproject under the ASC Scirntific Data Management effort. MyRedis is a web based utility designed to allow easy administration of instances of Redis databases. It can be usedd to view and manipulate data as well as run commands directly against a variety of different Redis hosts.

  16. Renaissance Administrator, Spring 1998.

    ERIC Educational Resources Information Center

    Dowdy, June P., Ed.

    1998-01-01

    This spring 1998 issue of Renaissance Administrator features the following articles: (1) "Servant Leadership and Higher Education--What is Leadership?" (Richard E. Hasselbach); (2) "Teaching Writing in the 90's--Carnivorous Printers and Dying Grandmothers" (Helen Ruggieri); (3) Assignment--Journal Writing" (Lynn Muscato); and (4) "A Business…

  17. Occupational exposure to electric and magnetic fields during tasks at ground or floor level at 110 kV substations in Finland

    PubMed Central

    Korpinen, Leena; Pääkkönen, Rauno

    2016-01-01

    The aim was to investigate occupational exposure to electric and magnetic fields during tasks at ground or floor level at 110 kV substations in Finland and to compare the measured values to Directive 2013/35/EU. Altogether, 347 electric field measurements and 100 magnetic field measurements were performed. The average value of all electric fields was 2.3 kV/m (maximum 6.4 kV/m) and that of magnetic fields was 5.8 µT (maximum 51.0 µT). It can be concluded that the electric and magnetic field exposure at ground or floor level is typically below the low action levels of Directive 2013/35/EU. The transposition of the directive will not create new needs to modify the work practice of the evaluated tasks, which can continue to be performed as before. However, for workers with medical implants, the exposure may be high enough to cause interference. PMID:27075421

  18. 7. Administrative structures.

    PubMed

    2014-05-01

    The basic systems of any society rarely can operate independently. Instead, they are dependent and often interdependent upon other entities. Such entities control the resources within their respective systems. Thus, coordination and control agencies require contracts or memoranda of understanding with these entities in order to assure access to the resources required during a crisis. These administrative structures include: (1) governmental institutions and agencies, including the military; (2) intergovernmental organisations; (3) nongovernmental organisations; (4) commercial private sector organisations; and (5) academic institutions. These dependencies create potential barriers to the provision of coordination and control including: (1) the complexity of the administrative structures with which coordination and control must interact; (2) the location of resources; (3) finding responsible person(s); (4) the competence and compatibility; (5) methods of access; (6) payment; (7) contracts and memoranda of understanding; (8) inventories of accessible resources; (9) competition for the mandate, power, and resources; and (10) jealousy. The need for potential interactions between administrative structures requires that agreements for the sharing of resources during crises be reached as part of planning and preparedness. Gaining an understanding of these relationships is an important area for research.

  19. Study of insulator mortars. Part 1: Comparative analysis of the freeze-thaw durability of cement grouts and mortars in line and sub-station porcelain insulators

    SciTech Connect

    Durand, B.

    1995-11-01

    As part of a major study being conducted on the durability of insulators in transmission lines and sub-station equipment comprising insulating components, seven Hydro-Quebec suppliers have contributed a number of samples made from the cement grouts and mortars used in manufacturing their equipment. The manufacturers` samples and those made in house were tested in the laboratory for compressive, tensile and flexural strength, as well as freezing and thawing, shrinkage/expansion to wetting and drying, autoclave expansion and carbonation. This paper presents the results of the freeze-thaw tests that consisted in determining changes in mass and length, uniaxial compressive strength, and tensile and flexural strength. The freeze-thaw test was conducted according to ASTM Test Method C666(B), which was used to determine the resistance of concrete specimens to rapidly repeated cycles of freezing and thawing (freezing in air at {minus}18 C and thawing in water at 4 C, 3-h cycles, 530 cycles in total). Two specific trends were noted: (1) eleven series of prisms showed less than 0.055% linear expansion after 530 freeze-thaw cycles, and (2) eight series of prisms showed more than 0.200% linear expansion. Two definite trends also emerged regarding changes in mass: (1) twelve series of prisms showed little change in mass after 530 freeze-thaw cycles and (2) seven series of prisms registered substantial changes in mass, in some cases over 10%. An analysis of the test results for compressive, tensile and flexural strengths showed that the specimens exhibiting little increase in expansion and loss of mass had an increase in mechanical resistance during the freeze-thaw test, while the opposite was true for specimens that showed considerable linear expansion and loss of mass, i.e. their compressive, tensile and flexural strengths decreased during the freeze-thaw test.

  20. Administration of Educational Services: A Glossary of Basic Administration Terminology.

    ERIC Educational Resources Information Center

    Wheelbarger, J. J.

    From "achievement motivation" and "administration" to "Theory Z" and "viscidity and hedonic tone," this glossary defines 87 terms as they are used in educational administration. The terms include philosophical, psychological, organizational, and social concepts, but they all are employed in the theory and practice of administration. A short…

  1. The Efficacy of Administrator Preparation Programs: Private School Administrators' Attitudes.

    ERIC Educational Resources Information Center

    Hughes, H. Woodrow; Johnson, Ruth N.; Madjidi, Farzin

    This report examines divergent views that may exist among administrators based on administrators' demographic characteristics and how these differences affect curriculum design for this group. It looks at factors, such as the person's age, gender, and ethnicity, that might have influenced whether or not an administrator completed a…

  2. A Review of the Literature on College Administrators and Administrations.

    ERIC Educational Resources Information Center

    Nash, George; Uhse, Stefan

    A review of the extensive literature on college administration and college administrators reveals there are relatively few empirical studies in the field. It was also observed that: there is widespread agreement on a few broad principles; there has been a heavy emphasis on human relations and proper administrative procedures; there are fundamental…

  3. Lessons from the Top: Administration.

    ERIC Educational Resources Information Center

    Rude, Ron

    1999-01-01

    A superintendent with 20-plus years' teaching experience in the district discusses with a "both sides of the fence" perspective issues of standards, teacher pay, training and compensation for board members, teacher/administrator relationship, and the administrator role. (MLF)

  4. Administrative Aspects of Human Experimentation.

    ERIC Educational Resources Information Center

    Irvine, George W.

    1992-01-01

    The following administrative aspects of scientific experimentation with human subjects are discussed: the definition of human experimentation; the distinction between experimentation and treatment; investigator responsibility; documentation; the elements and principles of informed consent; and the administrator's role in establishing and…

  5. Three Generations of Educational Administration.

    ERIC Educational Resources Information Center

    Sharpe, F. G.

    This paper compares two Australian educational administration texts published in 1963 to reflect critically on the radical changes that have occurred in educational administration in Australia since then. The books are "Headmasters for Better Schools," by Bassett, Crane, and Walker; and "Training the Administrator," by Cunningham and Radford. The…

  6. Straight Talk about School Administrators.

    ERIC Educational Resources Information Center

    Association of California School Administrators.

    In this report, the Association of California School Administrators examined some of the myths and misrepresentations about administration in California's public schools. Specifically, it examined the following five myths: (1) A lot of money that could be better spent in the classroom is being wasted on administration. (2) There are too many…

  7. Special Education Administration Training Program.

    ERIC Educational Resources Information Center

    Watherman, Richard F.; Hollingsworth, Sue Ann

    Presented are course materials from a competency based education program in special education administration. It is explained that the Special Education Administration Training Program (SEATP) is designed for continuing education of administrators. Materials are divided into three self contained curriculum areas: fiscal management, personnel…

  8. Administrators' Decisions about Resource Allocation

    ERIC Educational Resources Information Center

    Knight, William E.; Folkins, John W.; Hakel, Milton D.; Kennell, Richard P.

    2011-01-01

    Do academic administrators make decisions about resource allocation differently depending on the discipline receiving the funding? Does an administrator's academic identity influence these decisions? This study explored those questions with a sample of 1,690 academic administrators at doctoral-research universities. Participants used fictional…

  9. Certification of Financial Aid Administrators

    ERIC Educational Resources Information Center

    Peterson, Stacey A.

    2011-01-01

    The certification of financial aid administrators has been debated for over 37 years. A job satisfaction survey conducted by the National Association of Student Financial Aid Administrators (NASFAA, 2008a) revealed that college and university administrators' perceptions of the efficiency, effectiveness, and quality of the services provided by the…

  10. Key Obama officials leave administration

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2013-01-01

    Secretary of the Interior Ken Salazar is one of the latest members of the Obama administration to announce that he is leaving his position near the start of President Obama's second term in office. Salazar, who has served as interior secretary since January 2009, intends to leave the department by the end of March, the department noted on 16 January. Salazar joins a number of other key officials who are planning to leave the administration. They include Environmental Protection Agency administrator Lisa Jackson, National Oceanic and Atmospheric Administration administrator Jane Lubchenco, and U.S. Geological Survey director Marcia McNutt.

  11. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  12. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  13. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract administration. When a negotiated CAS price adjustment or a determination of noncompliance is required at...

  14. Attitudes, Administrative Styles, and Outcomes.

    ERIC Educational Resources Information Center

    Laughlin, J. Stanley

    1984-01-01

    The literature on administrative style is reviewed. Attention is directed to four basic concepts of administrative style: (1) the structured, classical, traditional model; (2) the participatory or employee-involved operation; (3) a more behavioral scientific style; and (4) the situational or environmental style. These ideas are more fully…

  15. Network Systems Administration Needs Assessment.

    ERIC Educational Resources Information Center

    Lexington Community Coll., KY. Office of Institutional Research.

    In spring 1996, Lexington Community College (LCC) in Kentucky, conducted a survey to gather information on employment trends and educational needs in the field of network systems administration (NSA). NSA duties involve the installation and administration of network operating systems, applications software, and networking infrastructure;…

  16. Coaches Guide to Sport Administration.

    ERIC Educational Resources Information Center

    Leith, Larry M.

    This guide for athletic coaches offers a practical approach to the administrative functions of organizing, planning, leading, and controlling. Included are chapters on coaching administration, fund raising, organizing competitions, and designing effective budgets and controls. The guide addresses the following topics: (1) the categories of…

  17. Postmodernism in Higher Educational Administration

    ERIC Educational Resources Information Center

    Demaris, Michalyn C.; Kritsonis, William Allan

    2007-01-01

    Postmodernism has many inferences that can be applied to the theory and practice of higher educational administration. Today, in higher education administrators are continuously focused on strategies that will ensure the future of minority educational institutions. As a result postmodernism is an important factor in the future of higher…

  18. Toward an Applied Administrative Science.

    ERIC Educational Resources Information Center

    Dunbar, Roger L. M.

    1983-01-01

    A study of 65 articles from the 1981 volumes of "Administrative Science Quarterly" and "Harvard Business Review," using smallest space analysis, found that the few studies adopting subjective (instead of objective) approaches to analyzing organizational change were most likely to provide a basis for an applied administrative science. (Author/RW)

  19. How to Control Administrative Cost.

    ERIC Educational Resources Information Center

    Halfond, Jay A.

    1991-01-01

    Growth in college administration has increased costs and bureaucracy. Rather than wait for fiscal crisis or consumer revolt, academic leaders, including faculty and administrators, should initiate change by simplifying activities and procedures and rewarding consolidation. The challenge is to use resources more effectively and efficiently in a…

  20. Administrative Approaches to Educational Productivity.

    ERIC Educational Resources Information Center

    Koski, William S.; Levin, Henry M.

    1998-01-01

    Presents an institutional framework for raising higher education productivity through administrative and organizational devices: first, by examining two theories for explaining rising higher education costs and their different policy consequences, and then by presenting an administrative process for improving productivity that focuses on…

  1. Child Nutrition Programs. Administrative Manual.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    Recognizing the importance of efficient and effective program administration for the success of Utah's Child Nutrition Programs, the State Office of Education developed a manual to assist local program administrators in using the U.S. Department of Agriculture's (USDA's) programs. This document contains Part 1 of the manual's four interrelated…

  2. International Developments in Educational Administration.

    ERIC Educational Resources Information Center

    Stone, Franklin D.

    Review of the history and characteristics of international organizations in educational administration suggests that the time may be right for a worldwide organization. Five international organizations have formed since 1959, when the University Council for Educational Administration linked U.S. and Canadian educators. A chronological chart…

  3. Legal Administrative Systems. Curriculum Guide.

    ERIC Educational Resources Information Center

    Patton, Jan

    This curriculum guide provides materials for teachers to use in developing a course in legal administrative systems. Following an introductory section that lists the common essential elements of the course, the guide contains six sections that cover the following course topics: (1) introduction to legal administrative systems; (2) word processing;…

  4. Medical Administrative Systems. Curriculum Guide.

    ERIC Educational Resources Information Center

    Patton, Jan

    This curriculum guide provides materials for teachers to use in developing a course in medical administrative systems. Following an introductory section that lists the common essential elements of the course, the guide contains seven sections that cover the following course topics: (1) introduction to medical administrative systems; (2) word…

  5. Faculty Perspectives on Administrator Effectiveness.

    ERIC Educational Resources Information Center

    Bess, James L.

    The sources of faculty perspectives on the personal effectiveness of administrators are analyzed. It is proposed that faculty will be predisposed to see administrators in different lights, depending on structural elements in decision making and the orientation of the faculty members. Attention is directed to Talcott Parson's theory for classifying…

  6. Canadian and Comparative Educational Administration.

    ERIC Educational Resources Information Center

    Farquhar, Robin H., Ed.; Housego, Ian E., Ed.

    Most of the articles in this book evolved from papers presented during the Fourth Quadrennial International Intervisitation Program in Educational Administration held in Canada in 1978. Its purposes were to inform educational leaders from around the world about educational administration, organization, and policy in Canada and to provide a forum…

  7. In Praise of Fewer Administrators.

    ERIC Educational Resources Information Center

    Nichols, Donald D.; Stuart, William H.

    In response to increasing financial pressures, Oakland Community College instituted a policy in the 1970s to reduce the number of college administrators as a means of saving staff costs. While student enrollments increased from 11,700 in 1970 to 24,000 in 1980, the number of administrators fell from 84 to 32. This reduction was realized through…

  8. Writing Program Administration as Conversation.

    ERIC Educational Resources Information Center

    Recchio, Tom

    1998-01-01

    Considers relations between the official pedagogy of the writing program that the author administers and his administrative practices, to come to terms with the hidden curriculum of his situation. Argues for a shift from thinking about administration as masterful organization and implementation to conceiving of it as relational and receptive, a…

  9. Principals' Values in School Administration

    ERIC Educational Resources Information Center

    Aslanargun, Engin

    2012-01-01

    School administration is value driven area depending on the emotions, cultures, and human values as well as technique and structure. Over the long years, educational administration throughout the world have experienced the influence of logical positivism that is based on rational techniques more than philosophical consideration, ignored values and…

  10. Communication Skills for Educational Administrators.

    ERIC Educational Resources Information Center

    Rowicki, Mark A.

    This paper reviews and discusses the literature related to improving effective communication in educational settings. It compiles possible solutions to ineffective communications. To promote effective communication, administrators need to solicit opinions and be willing to listen to them. Most administrators tend to give direction instead of…

  11. Public Finance Administration. Second Edition.

    ERIC Educational Resources Information Center

    Reed, B. J.; Swain, John W.

    This book is intended for the nonexpert in finance who has a public administration background. It opens with a broad introduction to public finance administration and how this job is related to public budgeting, the practice of public-sector accounting, and the economic concepts of money and value. Issues surrounding public revenue, its sources,…

  12. The Magic of Library Administration.

    ERIC Educational Resources Information Center

    Holley, Edward G.

    We are better prepared today to deal with the problems in library administration, because we not only have the basic work of management theorists, but also staffs who are better educated and more interested in participation. During the last 25 years, there have been two strands in library administration. The older, human relations approach allowed…

  13. Managing Time: An Administrator's Guide.

    ERIC Educational Resources Information Center

    Neal, Richard G.

    Following a brief discussion of the concept of time as a resource and a clarification of that resource's importance, the author analyzes 20 ways administrators waste time and 40 ways administrators can save time. None of the techniques suggested require special forms or training. The time wasters considered fall into the areas of personal…

  14. Effectiveness of Administrative Working Relationships

    ERIC Educational Resources Information Center

    Murdy, Leonard L.

    1977-01-01

    Basically, the effectiveness of a local school district is determined by the quantity and quality of staff. To be effective, school administrators must maintain good working relationships. Examines the factors that contribute to both good and poor working relationships between teachers and administrators. (Author/RK)

  15. 7 CFR 62.100 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Definitions Administration § 62.100 Administrator. The LS Program Deputy Administrator is charged with the administration of official assessments conducted according to the regulations in this part and approved...

  16. 47 CFR 64.623 - Administrator requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... administrator of the TRS User Registration Database, the administrator of the VRS Access Technology Reference...) None of the administrator of the TRS User Registration Database, the administrator of the VRS...

  17. 7 CFR 1700.26 - Deputy Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrator aids and assists the Administrator. The Deputy Administrator provides overall policy direction to... Administrator is “first assistant” for purposes of the Federal Vacancies Reform Act of 1998 (5 U.S.C. 3345-3349d)....

  18. Transcultural perspectives in nursing administration.

    PubMed

    Andrews, M M

    1998-11-01

    Population demographics are reshaping the healthcare work force with respect to race, ethnicity, gender, national origin, sexual orientation, age, handicap, disability, and related factors as national sensitivity to various forms of diversity grows. Given the demographic trends, it is inevitable that nurse administrators will need skill in transcultural administration as they manage diversity and identify the cultural origins of conflict in the multicultural workplace. Culture influences the manner in which administrators, staff and patients perceive, identify, define and solve problems. In this article, the complex and interrelated factors that influence workplace diversity are examined. PMID:9824983

  19. Administrative Computing: Ideas That Work.

    ERIC Educational Resources Information Center

    White, Lawrence S.

    1984-01-01

    Describes administrative computer use in the Concord (NH) School District. Applications discussed include procurement, cash flow and investment, accounting and control, and teacher contracts, all performed with in-house programs. (MCG)

  20. An Administrator Goes to Congress.

    ERIC Educational Resources Information Center

    Penning, Nick

    1989-01-01

    A school administrator, who became minority staff director for the United States Senate Subcommittee on Education, Arts, and Humanities, forecasts that early childhood programs will achieve funding at the expense of the block grants of Chapter 2. (MLF)

  1. Managerial Techniques in Educational Administration.

    ERIC Educational Resources Information Center

    Lane, John J.

    1983-01-01

    Management techniques developed during the past 20 years assume the rational bureaucratic model. School administration requires contingent techniques. Quality Circle, Theory Z, and the McKenzie 7-Framework are discussed as techniques to increase school productivity. (MD)

  2. Reagan Administration Prepares Budget Cuts.

    ERIC Educational Resources Information Center

    Norman, Colin

    1981-01-01

    Describes tentative federal budget cuts affecting science education in the National Science Foundation, National Aeronautics and Space Administration, Department of Energy, National Institutes of Health, and the specific areas these budget cuts will affect. (DS)

  3. Rehabilitation and the Veterans' Administration

    NASA Technical Reports Server (NTRS)

    Meister, F.

    1974-01-01

    The Veteran's Administration health care system provides prosthetic and sensory aids for the rehabilitation of neurologically handicapped veterans. Research and development centers include prosthetic clinic teams, orthopedic shops, restoration clinics, bioengineering services, orthotics, etc.

  4. Administrative Actions for Noncompliance; Lesser Administrative Actions. Direct final rule.

    PubMed

    2016-04-01

    The Food and Drug Administration (FDA) is amending the regulation describing lesser administrative actions that may be imposed on an Institutional Review Board (IRB) that has failed to comply with FDA's IRB regulations. We are clarifying that FDA may require the IRB to withhold approval of new FDA-regulated studies, stop the enrollment of new subjects in ongoing studies, and terminate ongoing studies, or any combination of these actions until the noncompliance with FDA's IRB regulations is corrected. We are taking this action to ensure clarity and improve the accuracy of the regulations.

  5. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 9 2011-01-01 2011-01-01 false Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  6. 7 CFR 1000.25 - Market administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Market administrator. 1000.25 Section 1000.25... Rules of Practice and Procedure Governing Market Administrators § 1000.25 Market administrator. (a) Designation. The agency for the administration of the order shall be a market administrator selected by...

  7. 45 CFR 74.47 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Contract administration. 74.47 Section 74.47 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE... administration. A system for contract administration shall be maintained to ensure contractor conformance...

  8. 5 CFR 831.101 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Administration. 831.101 Section 831.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Administration and General Provisions § 831.101 Administration. (a) OPM has charge of...

  9. 45 CFR 1336.71 - Administrative costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Administrative costs. 1336.71 Section 1336.71... Administrative costs. Reasonable administrative costs of the RLF may be paid out of the loan fund. The grant award agreement between the Loan Administrator and ANA will set forth the allowable administrative...

  10. Administration of Occupational Education: A Suggested Guide.

    ERIC Educational Resources Information Center

    Valentine, Ivan E.

    Designed to provide administrators of occupation programs at the secondary and post-secondary level with a systems approach to administration, this administrators' guide brings together administrative and leadership tasks and responsibilities that must be considered by administrators when developing programs. The system presented in the guide is…

  11. Administratively Necessary Days: More than an Administrative Problem.

    ERIC Educational Resources Information Center

    Markson, Elizabeth W.; And Others

    1983-01-01

    Surveyed discharge planners at 49 acute care hospitals to ascertain problems they perceived in placing elderly patients. Selected hospital characteristics and placement practices and the ways in which they are associated with hospital back-up (sometimes called administratively necessary days) and delays in placement were analyzed. (Author/JAC)

  12. Policy and Public Administration, Educational Policy and Administration.

    ERIC Educational Resources Information Center

    Barrientos-Monzon, Ivan Luis

    This paper attempts to clean up some of the muddled thinking that obscures the distinction between theory and practice in educational administration. The author also applies his argument to the issue of possible gaps between policy formulation and policy implementation. The author begins by noting that there is a common misapprehension that in…

  13. TWRS information locator database system administrator`s manual

    SciTech Connect

    Knutson, B.J., Westinghouse Hanford

    1996-09-13

    This document is a guide for use by the Tank Waste Remediation System (TWRS) Information Locator Database (ILD) System Administrator. The TWRS ILD System is an inventory of information used in the TWRS Systems Engineering process to represent the TWRS Technical Baseline. The inventory is maintained in the form of a relational database developed in Paradox 4.5.

  14. 78 FR 32470 - Employment and Training Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Employment and Training Administration Investigations Regarding Eligibility To Apply for Worker Adjustment..., the Director of the Office of Trade Adjustment Assistance, Employment and Training Administration, has... Trade Adjustment Assistance, Employment and Training Administration, U.S. Department of Labor, Room...

  15. 76 FR 5212 - Employment and Training Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Employment and Training Administration Comment Request for Information Collection for Internal Fraud and...: Employment and Training Administration (ETA), Department of Labor. ACTION: Notice. SUMMARY: The Department of.... Currently, the Employment and Training Administration is soliciting comments concerning the Office...

  16. 76 FR 45621 - Employment and Training Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Employment and Training Administration Comment Request for Extension of Information Collection (Without... Temporary Employment Certification AGENCY: Employment and Training Administration. ACTION: Notice. SUMMARY... Training Administration (ETA) is soliciting comments concerning the extension of the approval for...

  17. 7 CFR 201.3 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) FEDERAL SEED ACT FEDERAL SEED ACT REGULATIONS Administration § 201.3 Administrator. The Administrator of the Agricultural Marketing Service...

  18. A Basic Manual for Physical Plant Administration.

    ERIC Educational Resources Information Center

    Weber, George O., Ed.; Fincham, Michael W., Ed.

    This book provides practical advice on problems of institutional plant management to physical plant administrators. Areas covered include the role, organization, and facilities of the physical plant department; personnel administration; financial administration; buildings maintenance and operation; custodial services; utilities distribution…

  19. 75 FR 6433 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Federal Aviation Administration Notice of Availability of a Draft Environmental Assessment and Public...: Federal Aviation Administration (FAA), DOT. ACTION: Notice of Availability of a Draft Environmental... Chicago, Illinois. SUMMARY: The Federal Aviation Administration (FAA) proposes to fund, construct,...

  20. 76 FR 78966 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Federal Aviation Administration Approval of Noise Compatibility Program for Kona International Airport at Keahole, Keahole, North Kona, HI AGENCY: Federal Aviation Administration, DOT. ACTION: Notice. SUMMARY: The Federal Aviation Administration (FAA) announces its findings on the noise compatibility...

  1. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  2. 7 CFR 3431.20 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the Veterinary Medicine Loan Repayment Program § 3431.20 Administration. The VMLRP will be administered by...

  3. 78 FR 29245 - U.S. General Services Administration Federal Property Management Regulations; Administrative Wage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... Administration Federal Property Management Regulations; Administrative Wage Garnishment AGENCY: Office of the... amending the U.S. General Services Administration Property Management Regulation (GSPMR) to remove... telephone number. The Administrative Wage Garnishment Code of Federal Regulations (CFR) Parts affected...

  4. Management Information for College Administrators.

    ERIC Educational Resources Information Center

    Bolin, John G., Ed.

    This booklet was prepared to assist college administrators in understanding the nature and purpose of management information and how such information can be organized into a functional system. In the first section the author discusses the increasing need for management information in higher education. More than ever before it is necessary for…

  5. Meaningful Written Communication by Administrators

    ERIC Educational Resources Information Center

    Keil, Virginia L.; McConnahan, Wendell R.

    2006-01-01

    Fifty-eight principals participated in this pilot study designed to examine the nature of school administrators' current practices in written communication. Work samples were examined against ISLLC standards that call for competency in facilitating vision, communicating culture and instruction, managing the organization, developing collaboration…

  6. The Administrative Team, Trust & Gender.

    ERIC Educational Resources Information Center

    Garfinkel, Elliot Z.

    This paper describes the first phase of a research study that examined (1) how superintendents define and select their administrative teams; (2) how team values are conceptualized by superintendents; (3) how "trust" is defined and its value perceived by superintendents; and (4) whether or not gender influences the way superintendents define "team"…

  7. Distributed Access to Administrative Systems.

    ERIC Educational Resources Information Center

    Carson, Eugene

    1987-01-01

    Administrators, faculty, and staff should have electronic access to records needed to perform their jobs, and students should have access to their own records--course registration and addresses. User-directed analysis and reporting are discussed and the security and audit issues are examined. (Author/MLW)

  8. RARE II: The Administration's View

    ERIC Educational Resources Information Center

    Cutler, M. Rupert

    1977-01-01

    RARE II is a new Roadless Area Review and Evaluation of the National Forest system. Administrators are attempting to inventory existing wilderness areas and to determine criteria for setting aside additional ones. This information will be used for the required 1980 update of the national assessment of forests and rangelands. (MA)

  9. CONTRACT ADMINISTRATIVE TRACKING SYSTEM (CATS)

    EPA Science Inventory

    The Contract Administrative Tracking System (CATS) was developed in response to an ORD NHEERL, Mid-Continent Ecology Division (MED)-recognized need for an automated tracking and retrieval system for Cost Reimbursable Level of Effort (CR/LOE) Contracts. CATS is an Oracle-based app...

  10. Reducing nurse medicine administration errors.

    PubMed

    Ofosu, Rose; Jarrett, Patricia

    Errors in administering medicines are common and can compromise the safety of patients. This review discusses the causes of drug administration error in hospitals by student and registered nurses, and the practical measures educators and hospitals can take to improve nurses' knowledge and skills in medicines management, and reduce drug errors.

  11. The Reagan Administration's EEO Policy.

    ERIC Educational Resources Information Center

    Reynolds, William Bradford

    The Reagan administration is committed to the principle of equal employment opportunity (EEO). No policy shift has occurred in the treatment of "class action" litigation, or in the "pattern or practice" suits in the Justice Department's Title VII enforcement activities. Significant money settlements have been obtained in "pattern and practice"…

  12. Fighting Fires in Educational Administration.

    ERIC Educational Resources Information Center

    Weick, Karl E.

    1996-01-01

    Recent research on wildland fire fighting supports educational administrators' use of the fire-fighting metaphor to describe the nature of their work. Fire-fighting nuances illuminate subtle conditions in educational organizations that increase their vulnerability to failure. These parallels suggest five management conditions that determine…

  13. African American Administrators and Staff

    ERIC Educational Resources Information Center

    Wright, Dianne; Taylor, Janice D.; Burrell, Charlotte; Stewart, Gregory

    2006-01-01

    This article explores the issues of African American participation in the administrative ranks of the academy. The authors find that African Americans tend to hold positions that are marginal in academic organizations, lacking power and influence, and that not much has changed over recent decades. Forces influencing this condition are explored,…

  14. How Administrators Cope with Stress.

    ERIC Educational Resources Information Center

    Swent, Boyd

    1983-01-01

    As part of a comparative study, school administrators were asked to describe the techniques they found useful for handling the tension and pressure of their jobs. Exercise or physical activity was the most frequently mentioned stress-reduction technique. Psychological activities and development of interpersonal skills were also cited. (PP)

  15. Transforming Administration in Academic Libraries.

    ERIC Educational Resources Information Center

    Honea, Sion M.

    1997-01-01

    Examines the traditional hierarchical administrative structure in academic libraries. Also analyzes some of its features, and questions specific principles of management in order to propose a more balanced organizational type based on organizational behavior and leadership that will best enable academic libraries to meet challenges. (PEN)

  16. Administrative Utility Analysis: Study Summary.

    ERIC Educational Resources Information Center

    Peat, Marwick, Mitchell and Co., San Juan, Puerto Rico.

    This document summarizes the recommendations made as a result of a study on administrative utility analysis and vocational education programs for Puerto Rico. The major recommendation was that the Area of Vocational and Technical Education (AVTE) in the Puerto Rico Department of Education be restructured at the central organizational level, for…

  17. Increasing Faculty and Administrative Effectiveness.

    ERIC Educational Resources Information Center

    Heller, Jack F.

    A unified approach to identifying and solving the fundamental problems that prevent colleges and universities from responding effectively to new demands is presented. It demonstrates the underlying causes of institutional problems using case study examples of administrators and faculty members in their institutions. Chapter 1, "Current Approaches…

  18. Innovating Traditional Nursing Administration Challenges.

    PubMed

    Joseph, M Lindell; Fowler, Debra

    2016-03-01

    The evolving and complex practice environment calls for new mindsets among nurse leaders, academics, and nurse innovators to envision innovative ways to manage and optimize traditional tasks and processes in nursing administration. The purpose of this article is to present 3 case studies that used linear programming and simulation to innovate staffing enterprises, financial management of healthcare systems, and curricula development.

  19. Administrative Careers Serving the Environment.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    This guide was developed by the Environmental Protection Agency (EPA) to provide individual with information about potential administrative careers with the agency. The brochure's introduction presents an overview of the EPA and its involvement in setting environmental standards, standards enforcement and monitoring, and future trends in…

  20. Research Administrators as Servant Leaders

    ERIC Educational Resources Information Center

    Waite, Joann

    2011-01-01

    Within the sponsored research support offices in departments at research institutions, non-profits, and undergraduate institutions, research administrators are often perceived as servant leaders by their own membership organizations and those who work with them. This perception is influenced by survey results focusing on character. Parolini (2004)…

  1. Reforming the Educational Administration Curriculum.

    ERIC Educational Resources Information Center

    Miklos, Erwin

    This paper discusses the conceptual reform of university-based graduate level administrator preparation programs. The functionalist, interpretative, and critical approaches to social science have important implications for the study of motivation, decision-making, communication and leadership. Interpretative and critical approaches must be woven…

  2. Administration and the Territorial Imperative.

    ERIC Educational Resources Information Center

    Moser, Robert P.

    This paper explores some of the evidence relating similarities between lower animal behavior in defense of territory and administrative behavior in defense of position prerogative. The bureaucratic organization has a system of sanctions to penalize those who would infringe upon the territory of superordinates. Humans mark their domains by audio…

  3. Leadership Styles of School Administrators.

    ERIC Educational Resources Information Center

    Beyer, Bonnie; Ruhl-Smith, Connie

    1996-01-01

    Examined leadership styles of principals and assistant principals employed in the Texas Panhandle area, focusing on administrator differences based on school level, position held, and gender. Employed four leadership domains (functional, interpersonal, contextual, and programmatic) as a basis for the survey instrument. Principals at all levels are…

  4. Administrator Success: An Artifactual Finding.

    ERIC Educational Resources Information Center

    Charters, W. W., Jr.

    1979-01-01

    A study conducted 15 years ago--which indicated that school administrators' success is dependent on the relationship between their personalities and the social setting of the school district--is criticized. The statistical analysis originally used is described as spurious. (MH)

  5. Novel Approaches to Surfactant Administration

    PubMed Central

    Gupta, Samir; Donn, Steven M.

    2012-01-01

    Surfactant replacement therapy has been the mainstay of treatment for preterm infants with respiratory distress syndrome for more than twenty years. For the most part, surfactant is administered intratracheally, followed by mechanical ventilation. In recent years, the growing interest in noninvasive ventilation has led to novel approaches of administration. This paper will review these techniques and the associated clinical evidence. PMID:23243504

  6. Ethical Dilemmas for School Administrators

    ERIC Educational Resources Information Center

    Denig, Stephen J.; Quinn, Terrence

    2001-01-01

    Schools are ethical organizations. The daily schedule of educational administrators is filled with ethical dilemmas and moral decisions. As reflective practitioners, school leaders know that the decisions that are made and the values that underlie those decisions are filled with moral implications for the entire school community. In this paper,…

  7. Issues in Canadian Educational Administration.

    ERIC Educational Resources Information Center

    Williams, Thomas; Powell, Mava Jo

    Examining the challenges and responsibilities facing Canadian provincial and local boards of education, this paper focuses on economic, demographic, ideological, jurisdictional, and administrative problems. Both provincial and local school boards currently face increasing financial pressure as inflation soars and taxpayers demand fiscal restraint.…

  8. Financial Management in School Administration.

    ERIC Educational Resources Information Center

    Tronc, Keith, Ed.

    Because Australian school principals are being given increasing autonomy, knowledge of basic accounting principles and skill in elementary financial management are becoming more necessary. This book attempts to supply school administrators with information needed to handle new accounting duties and to lay a foundation for future fuller involvement…

  9. Women Administrators as Instructional Leaders

    ERIC Educational Resources Information Center

    Horner, Beth A.

    2013-01-01

    Women are under-represented in educational research and are much less likely to hold administrative positions than are men. This study, using the Liberal Feminist Theory and Structural Barrier Theory, proffers possible explanations for this phenomenon. Four women leaders were interviewed to gain insight into their instructional leadership…

  10. Innovating Traditional Nursing Administration Challenges.

    PubMed

    Joseph, M Lindell; Fowler, Debra

    2016-03-01

    The evolving and complex practice environment calls for new mindsets among nurse leaders, academics, and nurse innovators to envision innovative ways to manage and optimize traditional tasks and processes in nursing administration. The purpose of this article is to present 3 case studies that used linear programming and simulation to innovate staffing enterprises, financial management of healthcare systems, and curricula development. PMID:26906516

  11. Administrative Support Occupations Skill Standards.

    ERIC Educational Resources Information Center

    Professional Secretaries International, Kansas City, MO.

    This document establishes a set of performance expectations based on current practices in administrative support occupations. It is designed to assist individuals, training providers, employers, management personnel, and professional organizations in matching knowledge, abilities, and interests to knowledge and skills required for success in…

  12. Evaluating Administrative/Supervisory Performance.

    ERIC Educational Resources Information Center

    Educational Research Service, Arlington, VA.

    This is a report on the third survey conducted on procedures for evaluating the performance of administrators and supervisors in local school systems. A questionnaire was sent to school systems enrolling 25,000 or more pupils, and results indicated that 84 of the 154 responding systems have formal evaluation procedures. Tables and discussions of…

  13. Software Solutions for Better Administration.

    ERIC Educational Resources Information Center

    Kazanjian, Edward

    1997-01-01

    The CO/OP (founded in 1973 as the Massachusetts Association of School Business Officials Cooperative Corporation) has created and produced administrative software for schools. Describes two areas in which software can increase revenue and provide protection for personnel: (1) invoice/accounts receivable for the rental of school space; and (2) an…

  14. 5 CFR 362.101 - Program administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Program administration. 362.101 Section 362.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PATHWAYS PROGRAMS General Provisions § 362.101 Program administration. (a) The Pathways Programs authorized under Executive Order 13562 consist of the...

  15. 14 CFR 1201.103 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Administration. 1201.103 Section 1201.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Introduction § 1201.103 Administration. (a) NASA is headed by an Administrator, who is...

  16. 14 CFR § 1201.103 - Administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Administration. § 1201.103 Section § 1201.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Introduction § 1201.103 Administration. (a) NASA is headed by an Administrator, who...

  17. 14 CFR 1201.103 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Administration. 1201.103 Section 1201.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Introduction § 1201.103 Administration. (a) NASA is headed by an Administrator, who is...

  18. 14 CFR 1201.103 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Administration. 1201.103 Section 1201.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Introduction § 1201.103 Administration. (a) NASA is headed by an Administrator, who is...

  19. 28 CFR 36.204 - Administrative methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Administrative methods. 36.204 Section 36... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES General Requirements § 36.204 Administrative methods... standards or criteria or methods of administration that have the effect of discriminating on the basis...

  20. 18 CFR 415.40 - Administrative agency.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Administrative agency. 415.40 Section 415.40 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-FLOOD PLAIN REGULATIONS Administration § 415.40 Administrative agency....

  1. 18 CFR 415.40 - Administrative agency.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Administrative agency. 415.40 Section 415.40 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-FLOOD PLAIN REGULATIONS Administration § 415.40 Administrative agency....

  2. 28 CFR 0.126 - Administrative support.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false Administrative support. 0.126 Section 0.126 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.126 Administrative support. The Department of Justice shall...

  3. 28 CFR 0.126 - Administrative support.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false Administrative support. 0.126 Section 0.126 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.126 Administrative support. The Department of Justice shall...

  4. 28 CFR 0.126 - Administrative support.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Administrative support. 0.126 Section 0.126 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.126 Administrative support. The Department of Justice shall...

  5. 28 CFR 0.126 - Administrative support.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false Administrative support. 0.126 Section 0.126 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.126 Administrative support. The Department of Justice shall...

  6. 28 CFR 0.126 - Administrative support.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Administrative support. 0.126 Section 0.126 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.126 Administrative support. The Department of Justice shall...

  7. 40 CFR 142.24 - Administrator's rescission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Administrator's rescission. 142.24... Exemptions § 142.24 Administrator's rescission. If, upon notification of a finding by the Administrator under... revised schedule, the Administrator shall rescind the application of his finding to that...

  8. 7 CFR 1230.603 - Administrator, FSA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, FSA. 1230.603 Section 1230.603... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.603 Administrator, FSA. The term Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer...

  9. 7 CFR 1280.603 - Administrator, FSA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, FSA. 1280.603 Section 1280.603... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.603 Administrator, FSA. Administrator, FSA, means the Administrator, of the Farm Service Agency, or any officer or employee of USDA to...

  10. 7 CFR 1280.602 - Administrator, AMS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, AMS. 1280.602 Section 1280.602... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.602 Administrator, AMS. Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or any officer or employee of...

  11. 7 CFR 1230.602 - Administrator, AMS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Administrator, AMS. 1230.602 Section 1230.602... CONSUMER INFORMATION Procedures for the Conduct of Referendum Definitions § 1230.602 Administrator, AMS. The term Administrator, AMS, means the Administrator of the Agricultural Marketing Service, or...

  12. 7 CFR 868.5 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Administrator. 868.5 Section 868.5 Agriculture... FOR CERTAIN AGRICULTURAL COMMODITIES Regulations Administration § 868.5 Administrator. The Administrator, under the authority delegated by the Secretary, is charged with administering the programs...

  13. 24 CFR 982.54 - Administrative plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Administrative plan. 982.54 Section... SECTION 8 TENANT-BASED ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM HUD Requirements and PHA Plan for Administration of Program § 982.54 Administrative plan. (a) The PHA must adopt a written administrative plan...

  14. 24 CFR 982.54 - Administrative plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Administrative plan. 982.54 Section... SECTION 8 TENANT BASED ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM HUD Requirements and PHA Plan for Administration of Program § 982.54 Administrative plan. (a) The PHA must adopt a written administrative plan...

  15. 36 CFR 1210.47 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Contract administration. 1210.47 Section 1210.47 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION... § 1210.47 Contract administration. A system for contract administration shall be maintained to...

  16. 43 CFR 12.947 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Contract administration. 12.947 Section 12.947 Public Lands: Interior Office of the Secretary of the Interior ADMINISTRATIVE AND AUDIT... Requirements § 12.947 Contract administration. A system for contract administration shall be maintained...

  17. 45 CFR 152.6 - Program administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Program administration. 152.6 Section 152.6 Public... CONDITION INSURANCE PLAN PROGRAM PCIP Program Administration § 152.6 Program administration. (a) General... nonprofit private entities. (b) Administration by State. A State (or its designated non-profit...

  18. 16 CFR 1.71 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Administration. 1.71 Section 1.71 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE GENERAL PROCEDURES Administration of the Fair Credit Reporting Act § 1.71 Administration. The general administration of the...

  19. 16 CFR 1.71 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Administration. 1.71 Section 1.71 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE GENERAL PROCEDURES Administration of the Fair Credit Reporting Act § 1.71 Administration. The general administration of the...

  20. 7 CFR 30.61 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Administration. 30.61 Section 30.61 Agriculture... AND STANDARDS Administration § 30.61 Administration. The Director, Tobacco Division, Agricultural... the Division and the performance of all duties assigned thereto in the administration of the...

  1. 7 CFR 29.9231 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Administration. 29.9231 Section 29.9231 Agriculture... Tobacco Produced and Marketed in a Quota Area Administration § 29.9231 Administration. The Director... the administration of the act. The conduct of all services and the licensing or employment...

  2. 7 CFR 29.51 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Administration. 29.51 Section 29.51 Agriculture... INSPECTION Regulations Administration § 29.51 Administration. The Director is charged with the supervision of the Division and the performance of all duties assigned thereto in the administration of the...

  3. Needs Assessment: "Management Skills of Educational Administrators."

    ERIC Educational Resources Information Center

    Sklarz, David P.

    Administrators in the Marblehead Public Schools in Massachusetts were asked to rate 48 administrative skills in terms of their importance for administrators in the local district, the need for improvement in these skills among district administrators in general, and the need for improvement in the skills by the survey respondent in particular. Of…

  4. 14 CFR 1201.103 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Administration. 1201.103 Section 1201.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Introduction § 1201.103 Administration. (a) NASA is headed by an Administrator, who is...

  5. 45 CFR 96.88 - Administrative costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Administrative costs. 96.88 Section 96.88 Public... Assistance Program § 96.88 Administrative costs. (a) Costs of planning and administration. Any expenditure... be included in determining administrative costs subject to the statutory limitation on...

  6. 24 CFR 583.135 - Administrative costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Administrative costs. 583.135... Administrative costs. (a) General. Up to five percent of any grant awarded under this part may be used for the purpose of paying costs of administering the assistance. (b) Administrative costs. Administrative...

  7. 20 CFR 632.174 - Administrative costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Administrative costs. 632.174 Section 632.174 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN... Administrative costs. Administrative costs for this subpart are limited to and shall not exceed 20 percent of...

  8. 42 CFR 401.148 - Administrative review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Administrative review. 401.148 Section 401.148... PROVISIONS GENERAL ADMINISTRATIVE REQUIREMENTS Confidentiality and Disclosure § 401.148 Administrative review. (a) Review by the Administrator. A person whose request has been denied may initiate a review...

  9. 19 CFR 145.21 - Administrative review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 2 2013-04-01 2013-04-01 false Administrative review. 145.21 Section 145.21... TREASURY (CONTINUED) MAIL IMPORTATIONS Administrative Review of Mail Entries § 145.21 Administrative review... administrative review in accordance with this subpart....

  10. 42 CFR 405.1875 - Administrator review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Administrator review. 405.1875 Section 405.1875... Appeals § 405.1875 Administrator review. (a) Basic rule: Time limit for rendering Administrator decisions, Board decisions, and action subject to immediate review. The Administrator, at his or her...

  11. 19 CFR 145.21 - Administrative review.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 2 2011-04-01 2011-04-01 false Administrative review. 145.21 Section 145.21... TREASURY (CONTINUED) MAIL IMPORTATIONS Administrative Review of Mail Entries § 145.21 Administrative review... administrative review in accordance with this subpart....

  12. 19 CFR 145.21 - Administrative review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Administrative review. 145.21 Section 145.21... TREASURY (CONTINUED) MAIL IMPORTATIONS Administrative Review of Mail Entries § 145.21 Administrative review... administrative review in accordance with this subpart....

  13. 28 CFR 36.204 - Administrative methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Administrative methods. 36.204 Section 36... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES General Requirements § 36.204 Administrative methods... standards or criteria or methods of administration that have the effect of discriminating on the basis...

  14. 28 CFR 345.57 - Administrative pay.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Administrative pay. 345.57 Section 345.57 Judicial Administration FEDERAL PRISON INDUSTRIES, INC., DEPARTMENT OF JUSTICE FEDERAL PRISON INDUSTRIES (FPI) INMATE WORK PROGRAMS Inmate Pay and Benefits § 345.57 Administrative pay. An inmate excused...

  15. 28 CFR 345.57 - Administrative pay.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Administrative pay. 345.57 Section 345.57 Judicial Administration FEDERAL PRISON INDUSTRIES, INC., DEPARTMENT OF JUSTICE FEDERAL PRISON INDUSTRIES (FPI) INMATE WORK PROGRAMS Inmate Pay and Benefits § 345.57 Administrative pay. An inmate excused...

  16. 28 CFR 345.57 - Administrative pay.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Administrative pay. 345.57 Section 345.57 Judicial Administration FEDERAL PRISON INDUSTRIES, INC., DEPARTMENT OF JUSTICE FEDERAL PRISON INDUSTRIES (FPI) INMATE WORK PROGRAMS Inmate Pay and Benefits § 345.57 Administrative pay. An inmate excused...

  17. 28 CFR 345.57 - Administrative pay.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Administrative pay. 345.57 Section 345.57 Judicial Administration FEDERAL PRISON INDUSTRIES, INC., DEPARTMENT OF JUSTICE FEDERAL PRISON INDUSTRIES (FPI) INMATE WORK PROGRAMS Inmate Pay and Benefits § 345.57 Administrative pay. An inmate excused...

  18. 28 CFR 345.57 - Administrative pay.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Administrative pay. 345.57 Section 345.57 Judicial Administration FEDERAL PRISON INDUSTRIES, INC., DEPARTMENT OF JUSTICE FEDERAL PRISON INDUSTRIES (FPI) INMATE WORK PROGRAMS Inmate Pay and Benefits § 345.57 Administrative pay. An inmate excused...

  19. Public School Administrators: Components of Burnout.

    ERIC Educational Resources Information Center

    Wax, Anne S.; Hales, Loyde W.

    The objectives of this study of public school administrators were to determine the level of burnout experienced by school administrators, the relationships between burnout and stress measures, the factors associated with burnout, and the relationships between administrative level and components of the Administrative Role Perception Inventory…

  20. 48 CFR 702.170-2 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Administrator. 702.170-2 Section 702.170-2 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-2 Administrator. Administrator means the Administrator...

  1. The administrator's quest for quality.

    PubMed

    Ross, A

    1988-01-01

    Times are tough and will become even tougher. Retrenchment issues will be foremost in many operational settings. Failure to understand baseline quality standards will make it extremely difficult to know where to cut and how to regroup without adversely affecting patient attitudes and service. Practice patterns are changing rapidly and the astute administrator needs to be prepared to participate freely in decisions affecting quality, service and costs.

  2. The administration of human services.

    PubMed

    Hasenfeld, Y

    1985-05-01

    Human service programs have gone from a period of rapid growth in the 1960s and early 1970s to a period of retrenchment in the 1980s. The changing political and economic context has forced these programs to undergo major organizational transformations and to adopt different administrative strategies. These include degovernmentalization of social services, reliance on cutback management, and deprofessionalization of human-service workers. The article explores the implications of these developments on the delivery of services to the public.

  3. Accidental intrathecal administration of vincristine.

    PubMed

    D'Addario, Adriana; Galuppo, Juan; Navari, Carlos; Schultz, Marcelo; Cuello, Nélida; Troncoso, Juan C; Riudavets, Miguel Angel

    2010-03-01

    We describe a case of accidental intrathecal administration of vincristine in a 33-year-old man with clinical diagnosis of acute lymphocytic leukemia. The patient died 20 days after receiving the drug. Clinically, the patient developed acute ascending paralysis with motor and sensory dysfunctions, and respiratory failure. Neuropathological investigation revealed lesions in spinal cord, roots, and cerebellum characterized by rarefaction of the neuropil, axonal, and myelin degeneration, accompanied by macrophagic infiltration.

  4. 77 FR 20779 - Committee on Administration and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ...; ] ADMINISTRATIVE CONFERENCE OF THE UNITED STATES Committee on Administration and Management AGENCY: Administrative... public meeting of the Committee on Administration and Management of the Assembly of the Administrative... ``About,'' then on ``The Committees,'' and then on ``Committee on Administration and...

  5. 7 CFR 1700.53 - Persons serving as Acting Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Assistant Administrator, Electric Program. (3) Assistant Administrator, Water and Environmental Programs. (4) Assistant Administrator, Telecommunications Programs. (5) Assistant Administrator, Program Accounting...

  6. [Administrative deconcentration and social benefits].

    PubMed

    Palma, E; Rufián, D

    1990-01-01

    This paper defines the concepts of deconcentration and decentralization in terms of the different approaches and doctrines that relate to the two processes. In addition, it describes the two types of deconcentration, functional and territorial, stressing the importance of implementing both types and placing special emphasis on the role of space both in the structure of health service administration and in the distribution of authority between the State and the decentralized agencies. Finally, the relationship between deconcentration, democracy, community participation, and social benefits is analyzed, and possible ways to shift responsibility to decentralized agencies are suggested.

  7. 14 CFR 1221.107 - Establishment of the NASA Administrator's, Deputy Administrator's, and Associate Deputy...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... × 4 feet; (2) The Administrator's Flag has four stars; (3) The Deputy Administrator's Flag has three stars; and (4) The Associate Deputy Administrator's Flag has two stars. (b) Flags representing...

  8. 14 CFR § 1221.107 - Establishment of the NASA Administrator's, Deputy Administrator's, and Associate Deputy...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... × 4 feet; (2) The Administrator's Flag has four stars; (3) The Deputy Administrator's Flag has three stars; and (4) The Associate Deputy Administrator's Flag has two stars. (b) Flags representing...

  9. 14 CFR 1221.107 - Establishment of the NASA Administrator's, Deputy Administrator's, and Associate Deputy...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... × 4 feet; (2) The Administrator's Flag has four stars; (3) The Deputy Administrator's Flag has three stars; and (4) The Associate Deputy Administrator's Flag has two stars. (b) Flags representing...

  10. 14 CFR 1221.107 - Establishment of the NASA Administrator's, Deputy Administrator's, and Associate Deputy...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... × 4 feet; (2) The Administrator's Flag has four stars; (3) The Deputy Administrator's Flag has three stars; and (4) The Associate Deputy Administrator's Flag has two stars. (b) Flags representing...

  11. 14 CFR 1221.107 - Establishment of the NASA Administrator's, Deputy Administrator's, and Associate Deputy...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... × 4 feet; (2) The Administrator's Flag has four stars; (3) The Deputy Administrator's Flag has three stars; and (4) The Associate Deputy Administrator's Flag has two stars. (b) Flags representing...

  12. 45 CFR 1703.501 - Administrative Review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Administrative Review § 1703.501 Administrative Review. Any... part may file an objection in writing with the Executive Director to the Commissioners....

  13. 45 CFR 1703.501 - Administrative Review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Administrative Review § 1703.501 Administrative Review. Any... part may file an objection in writing with the Executive Director to the Commissioners....

  14. 45 CFR 1703.501 - Administrative Review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Administrative Review § 1703.501 Administrative Review. Any... part may file an objection in writing with the Executive Director to the Commissioners....

  15. 7 CFR 760.1301 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administration, and Related Agencies Appropriations Act, 2010 (2010 Agriculture Appropriations Bill, Pub. L. 111.... Participants have no right to seek an exception under this provision. The Deputy Administrator's refusal...

  16. 7 CFR 760.1301 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administration, and Related Agencies Appropriations Act, 2010 (2010 Agriculture Appropriations Bill, Pub. L. 111.... Participants have no right to seek an exception under this provision. The Deputy Administrator's refusal...

  17. 7 CFR 56.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) VOLUNTARY GRADING OF SHELL EGGS Grading of Shell Eggs General § 56.3 Administration. The Administrator shall perform, for...

  18. 48 CFR 3028.106 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administration. 3028.106 Section 3028.106 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY... 3028.106 Administration....

  19. Some Ethical-Moral Concerns in Administration.

    ERIC Educational Resources Information Center

    Enns, Frederick

    1981-01-01

    Presents and analyzes moral-ethical issues that arise in administration and concludes that past descriptive, objective, and scientific approaches to administration have failed to take full account of the moral-ethical dimension of human existence. (Author/WD)

  20. 7 CFR 631.3 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM General Provisions § 631.3 Administration. (a) NRCS is responsible for the administration of the Great Plains Conservation Program (GPCP)....

  1. 7 CFR 631.3 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM General Provisions § 631.3 Administration. (a) NRCS is responsible for the administration of the Great Plains Conservation Program (GPCP)....

  2. 7 CFR 631.3 - Administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM General Provisions § 631.3 Administration. (a) NRCS is responsible for the administration of the Great Plains Conservation Program (GPCP)....

  3. 14 CFR 1274.508 - Contract administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., conditions and specifications of the contract. ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contract administration. 1274.508 Section... WITH COMMERCIAL FIRMS Procurement Standards § 1274.508 Contract administration. A system for...

  4. 78 FR 13395 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... of October 23, 2012 (77 FR 64836) would require placement of fill on submerged lands jointly managed... Federal Aviation Administration Notice of Availability of Draft Alaska National Interest Lands Conservation Act (ANILCA) Section 810 Subsistence Evaluation. AGENCY: Federal Aviation Administration...

  5. 76 FR 2745 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Eighty-Fourth Meeting: RTCA Special Committee 159: Global Positioning System (GPS) AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Special...

  6. 77 FR 64837 - Federal Aviation Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Federal Aviation Administration Fourth Meeting: RTCA Special Committee 227, Standards of Navigation Performance AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION... 15, 2012. Kathy Hitt, Management Analyst, Business Operations Group, Federal Aviation...

  7. 20 CFR 652.8 - Administrative provisions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... FUNCTIONING OF STATE EMPLOYMENT SERVICES Employment Service Operations § 652.8 Administrative provisions. (a... consistent with the provisions of the Act, describing services offered by employment security agencies, job... government lawfully charged with administration of unemployment compensation laws, employment...

  8. National Aeronautics and Space Administration

    NASA Astrophysics Data System (ADS)

    White, M. Catherine

    NASA has requested a $14.3 billion budget for fiscal year 1995, which is $250 million below the $14.5 billion it received in fiscal 1994. NASA Administrator Daniel S. Goldin said the budget conveys the president's commitment to a strong and vital aeronautics and space program while reflecting today's very real fiscal constraints. No major programs were canceled.“The president's budget plan for NASA is a sound one, with reductions that still preserve a meaningful space program, but this is it. We can't get any closer to the bone,” Goldin warned. In real terms, this 5-year fiscal 1995 budget represents a 30% cut in the last 2 years. “We must hold the line at this level and will work closely with Congress to do so,” Goldin said.

  9. Novice Administrators: Psychological and Physiological Effects.

    ERIC Educational Resources Information Center

    Schmidt, Linda J.; Kosmoski, Georgia J.; Pollack, Dennis R.

    Novice school administrators find that demands for excellence have grown while budgets have shrunk. This paper reports on a study that examined the stress levels of beginning administrators. Two of the key questions for the study--Is the stress experienced by new school administrators manageable or out of control? and Does the job put beginning…

  10. Database Administration: Concepts, Tools, Experiences, and Problems.

    ERIC Educational Resources Information Center

    Leong-Hong, Belkis; Marron, Beatrice

    The concepts of data base administration, the role of the data base administrator (DBA), and computer software tools useful in data base administration are described in order to assist data base technologists and managers. A study of DBA's in the Federal Government is detailed in terms of the functions they perform, the software tools they use,…

  11. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  12. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  13. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  14. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  15. 46 CFR 296.50 - Administrative determinations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Administrative determinations. 296.50 Section 296.50 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS AFFECTING SUBSIDIZED VESSELS AND OPERATORS MARITIME SECURITY PROGRAM (MSP) Appeals Procedures § 296.50 Administrative determinations. (a) Policy. A Contractor who disagrees...

  16. 14 CFR 1275.106 - Administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Administrative actions. 1275.106 Section 1275.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION RESEARCH MISCONDUCT § 1275.106 Administrative actions. (a) Listed in paragraphs (a)(1) through (a)(3) of this section...

  17. 14 CFR 1275.106 - Administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Administrative actions. 1275.106 Section 1275.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION RESEARCH MISCONDUCT § 1275.106 Administrative actions. (a) Listed in paragraphs (a)(1) through (a)(3) of this section...

  18. 14 CFR 1275.106 - Administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Administrative actions. 1275.106 Section 1275.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION RESEARCH MISCONDUCT § 1275.106 Administrative actions. (a) Listed in paragraphs (a)(1) through (a)(3) of this section...

  19. College & University Business Administration. Third Edition.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    This text presents indepth coverage of five areas of college and university business administration, including administrative management, business management, fiscal management, and financial accounting and reporting. The section on administrative management encompasses institutional planning, management information systems and data processing,…

  20. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior...

  1. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior...

  2. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior...

  3. Attitudes toward Women School Administrators in Turkey

    ERIC Educational Resources Information Center

    Celikten, Mustafa

    2010-01-01

    There is a shortage of women in educational administration. Women represent a majority of teachers, yet men occupy most administrative positions. Although the numbers of women in administrative positions have been increasing during the last two decades, women are still reported as facing barriers and being discriminated against while reaching…

  4. The Turbulent Field of Public School Administration.

    ERIC Educational Resources Information Center

    Conners, Dennis A.; Reed, Donald B.

    1983-01-01

    Business and industry have exerted a strong influence on public schools and school administration, especially on assumptions about the school setting and its implications for administrator behavior. Schools have been assumed to be bureaucratic organizations in a stable environment, which implies that administrators should be leaders in…

  5. 24 CFR 320.9 - Pool administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Pool administration. 320.9 Section...-BACKED SECURITIES Pass-Through Type Securities § 320.9 Pool administration. The Association will only... prescribed by the Association. Pool administration requirements are set forth in such agreements or...

  6. 24 CFR 320.9 - Pool administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Pool administration. 320.9 Section...-BACKED SECURITIES Pass-Through Type Securities § 320.9 Pool administration. The Association will only... prescribed by the Association. Pool administration requirements are set forth in such agreements or...

  7. 24 CFR 320.9 - Pool administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Pool administration. 320.9 Section...-BACKED SECURITIES Pass-Through Type Securities § 320.9 Pool administration. The Association will only... prescribed by the Association. Pool administration requirements are set forth in such agreements or...

  8. 24 CFR 320.9 - Pool administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Pool administration. 320.9 Section...-BACKED SECURITIES Pass-Through Type Securities § 320.9 Pool administration. The Association will only... prescribed by the Association. Pool administration requirements are set forth in such agreements or...

  9. 7 CFR 1735.50 - Administrative findings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to support these findings are included in 7 CFR part 1737. ... 7 Agriculture 11 2012-01-01 2012-01-01 false Administrative findings. 1735.50 Section 1735.50... For Loan Approval § 1735.50 Administrative findings. The RE Act requires that the Administrator...

  10. 7 CFR 1735.50 - Administrative findings.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to support these findings are included in 7 CFR part 1737. ... 7 Agriculture 11 2014-01-01 2014-01-01 false Administrative findings. 1735.50 Section 1735.50... For Loan Approval § 1735.50 Administrative findings. The RE Act requires that the Administrator...

  11. 7 CFR 1735.50 - Administrative findings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... to support these findings are included in 7 CFR part 1737. ... 7 Agriculture 11 2013-01-01 2013-01-01 false Administrative findings. 1735.50 Section 1735.50... For Loan Approval § 1735.50 Administrative findings. The RE Act requires that the Administrator...

  12. 7 CFR 1735.50 - Administrative findings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to support these findings are included in 7 CFR part 1737. ... 7 Agriculture 11 2010-01-01 2010-01-01 false Administrative findings. 1735.50 Section 1735.50... For Loan Approval § 1735.50 Administrative findings. The RE Act requires that the Administrator...

  13. 7 CFR 1735.50 - Administrative findings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to support these findings are included in 7 CFR part 1737. ... 7 Agriculture 11 2011-01-01 2011-01-01 false Administrative findings. 1735.50 Section 1735.50... For Loan Approval § 1735.50 Administrative findings. The RE Act requires that the Administrator...

  14. 22 CFR 62.10 - Program administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Program administration. 62.10 Section 62.10 Foreign Relations DEPARTMENT OF STATE PUBLIC DIPLOMACY AND EXCHANGES EXCHANGE VISITOR PROGRAM General Provisions § 62.10 Program administration. Sponsors are responsible for the effective administration of...

  15. 22 CFR 62.10 - Program administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Program administration. 62.10 Section 62.10 Foreign Relations DEPARTMENT OF STATE PUBLIC DIPLOMACY AND EXCHANGES EXCHANGE VISITOR PROGRAM General Provisions § 62.10 Program administration. Sponsors are responsible for the effective administration of...

  16. 22 CFR 62.10 - Program administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Program administration. 62.10 Section 62.10 Foreign Relations DEPARTMENT OF STATE PUBLIC DIPLOMACY AND EXCHANGES EXCHANGE VISITOR PROGRAM General Provisions § 62.10 Program administration. Sponsors are responsible for the effective administration of...

  17. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607...

  18. 7 CFR 29.51 - Administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Administration. 29.51 Section 29.51 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... INSPECTION Regulations Administration § 29.51 Administration. The Director is charged with the supervision...

  19. 7 CFR 1205.11 - Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... Procedures for Conduct of Sign-up Period Definitions § 1205.11 Administrator. The term Administrator means the Administrator of the Agricultural Marketing Service, or any officer or employee of USDA to...

  20. 38 CFR 21.9770 - Administrative.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Administrative. 21.9770 Section 21.9770 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Administrative § 21.9770 Administrative....

  1. 38 CFR 21.9770 - Administrative.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Administrative. 21.9770 Section 21.9770 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Administrative § 21.9770 Administrative....

  2. 38 CFR 21.9770 - Administrative.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Administrative. 21.9770 Section 21.9770 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Administrative § 21.9770 Administrative....

  3. 38 CFR 21.9770 - Administrative.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Administrative. 21.9770 Section 21.9770 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Administrative § 21.9770 Administrative....

  4. 38 CFR 21.9770 - Administrative.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Administrative. 21.9770 Section 21.9770 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Administrative § 21.9770 Administrative....

  5. Individual Innovativeness Levels of Educational Administrators

    ERIC Educational Resources Information Center

    Coklar, Ahmet Naci

    2012-01-01

    In the present study carried out with 190 educational administrators, the individual innovativeness of educational administrators was examined. As a result of the study, it was found out that the educational administrators considered themselves as early adaptors. It was also revealed that professional seniority was not important in terms of…

  6. 24 CFR 891.725 - PAC administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false PAC administration. 891.725 Section... Individuals-Section 162 Assistance § 891.725 PAC administration. HUD is responsible for the administration of the PAC....

  7. 24 CFR 891.725 - PAC administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false PAC administration. 891.725 Section... Individuals-Section 162 Assistance § 891.725 PAC administration. HUD is responsible for the administration of the PAC....

  8. 2010 Profile of a Research Administrator

    ERIC Educational Resources Information Center

    Shambrook, Jennifer; Roberts, Thomas J.

    2011-01-01

    This paper expands upon the seminal work of Roberts and House, which described the first empirical study of the demographic profile of a research administrator. The original work was based upon data from the 2005 Research Administrator Survey (RAS), a regional study of research administrators in the southeastern United States. In this paper,…

  9. Faculty Involvement in Administration of Schools.

    ERIC Educational Resources Information Center

    Ogletree, Earl J.; Schmidt, Linda J.

    1992-01-01

    Contrasts the faculty-led administration of the Waldorf Schools founded by R. Steiner with the administration by local school councils established in the Chicago (Illinois) Public Schools through the School Reform Act. In Chicago, morale and status of teachers can be improved by increasing their administrative partnership. (SLD)

  10. 46 CFR 296.50 - Administrative determinations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Administrative determinations. 296.50 Section 296.50 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS AFFECTING SUBSIDIZED VESSELS AND..., Scott Air Force Base, IL 62225-5357. (c) Process. The Administrator, or the Commander in the case of...

  11. 38 CFR 49.47 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Contract administration. 49.47 Section 49.47 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED... administration. A system for contract administration shall be maintained to ensure contractor conformance...

  12. 7 CFR 235.3 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... programs in accordance with the applicable requirements of this part, 7 CFR parts 210, 215, 220, 225, 226... 7 Agriculture 4 2011-01-01 2011-01-01 false Administration. 235.3 Section 235.3 Agriculture... CHILD NUTRITION PROGRAMS STATE ADMINISTRATIVE EXPENSE FUNDS § 235.3 Administration. (a) Within...

  13. 20 CFR 632.263 - Administrative costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Administrative costs. 632.263 Section 632.263 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.263 Administrative...

  14. Infrastructure and Administrative Support for Online Programs

    ERIC Educational Resources Information Center

    Meyer, John D.; Barefield, Amanda C.

    2010-01-01

    The purpose of this study was to evaluate the availability and effectiveness of administrative support elements for online teaching faculty, and introduce a faculty validated Matrix for use as a guide in development of administrative support for online programs. When administrators make decisions about the infrastructure support needs of a current…

  15. 12 CFR 360.4 - Administrative expenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Administrative expenses. 360.4 Section 360.4 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY RESOLUTION AND RECEIVERSHIP RULES § 360.4 Administrative expenses. The priority for administrative...

  16. 47 CFR 64.623 - Administrator requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... section, the term “Administrator” shall refer to each of the TRS Numbering administrator, the administrator of the TRS User Registration Database, the administrator of the VRS Access Technology Reference... entity that is impartial and not an affiliate of any Internet-based TRS provider. (2) Neither...

  17. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior...

  18. IVA. Improving Vocational Administration. Final Report.

    ERIC Educational Resources Information Center

    EPD Consortium D, Richardson, TX.

    The Texas Improving Vocational Administration (IVA) project was conceived to improve preservice and inservice programs for vocational education administrators. Primary objectives were to (1) develop a method, including a survey, to determine existing inservice and preservice administrative training program competencies; (2) determine, using the…

  19. The School Business Administrator. Fourth Edition.

    ERIC Educational Resources Information Center

    Stevenson, Kenneth R.; Tharpe, Don I.

    This book examines the profession of the school business administrator within a city school system. It opens with a brief history of school business administration from the 19th century through today. Chapters 1 through 5 examine what school business administrators do, their responsibilities as managers, typical duties, and the educational and…

  20. 11 CFR 9007.7 - Administrative record.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... administrative record for final determinations under 11 CFR 9004.9 and 9005.1, and for repayment determinations... the administrative record by submitting them within the time periods set forth at 11 CFR 9004.9(f)(2... administrative record for determinations under 11 CFR 9004.9, 9005.1 and 9007.2 does not include: (1)...

  1. 7 CFR 23.2 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administration. (a) Title V will be administered by the Administrators of the Extension Service and the Cooperative State Research Service for extension and research programs respectively, in cooperation with the chief administrative officer of the State Land Grant University who will administer the program...

  2. 29 CFR 15.6 - Administrative action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Secretary of Labor ADMINISTRATIVE CLAIMS UNDER THE FEDERAL TORT CLAIMS ACT AND RELATED STATUTES Claims Against the Government Under the Federal Tort Claims Act § 15.6 Administrative action. (a... of an administrative claim under the Act or of notice of litigation seeking damages for an...

  3. 7 CFR 633.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Administration. 633.3 Section 633.3 Agriculture... AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.3 Administration. (a) The regulations in this part... administration and related policy matters. No determination by the State Technical Committee shall compel...

  4. 50 CFR 401.1 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Administration. 401.1 Section 401.1... INTERIOR AND NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT..., DEVELOPMENT AND ENHANCEMENT § 401.1 Administration. The Director of the U.S. Fish and Wildlife Service and...

  5. 20 CFR 628.310 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Administration. 628.310 Section 628.310 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE II OF THE JOB TRAINING PARTNERSHIP ACT State Programs § 628.310 Administration. Funds provided to...

  6. 7 CFR 250.2 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Administration. 250.2 Section 250.2 Agriculture... TERRITORIES AND POSSESSIONS AND AREAS UNDER ITS JURISDICTION General § 250.2 Administration. (a) Delegation to FNS. Within the Department, FNS shall act on behalf of the Department in the administration of...

  7. 7 CFR 631.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Administration. 631.3 Section 631.3 Agriculture... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM General Provisions § 631.3 Administration. (a) NRCS is responsible for the administration of the Great Plains Conservation Program (GPCP)....

  8. 7 CFR 210.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Administration. 210.3 Section 210.3 Agriculture... CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM General § 210.3 Administration. (a) FNS. FNS will act on behalf of the Department in the administration of the Program. Within FNS, the CND will...

  9. 33 CFR 5.07 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Administration. 5.07 Section 5.07... § 5.07 Administration. Any authority vested in the Commandant by this part may be delegated by him to... appropriate for the functioning, organization, and internal administration of the Auxiliary....

  10. 7 CFR 70.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Administration. 70.3 Section 70.3 Agriculture... PRODUCTS AND RABBIT PRODUCTS Grading of Poultry Products and Rabbit Products General § 70.3 Administration... Secretary may require in the enforcement or administration of the provisions of the Act and the...

  11. 7 CFR 57.10 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Administration. 57.10 Section 57.10 Agriculture... PRODUCTS INSPECTION ACT) Regulations Governing the Inspection of Eggs General § 57.10 Administration. The... require in the enforcement or administration of the provisions of the act and the regulations in this...

  12. 20 CFR 416.105 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Administration. 416.105 Section 416.105 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Introduction, General Provisions and Definitions § 416.105 Administration. The...

  13. 10 CFR 725.24 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Administration. 725.24 Section 725.24 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.24 Administration. With respect to each permit... designate a DOE or National Nuclear Security Administration office which will: (a) Process all...

  14. 7 CFR 235.3 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... programs in accordance with the applicable requirements of this part, 7 CFR parts 210, 215, 220, 225, 226... 7 Agriculture 4 2010-01-01 2010-01-01 false Administration. 235.3 Section 235.3 Agriculture... CHILD NUTRITION PROGRAMS STATE ADMINISTRATIVE EXPENSE FUNDS § 235.3 Administration. (a) Within...

  15. 48 CFR 243.204 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders....

  16. 7 CFR 251.2 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Administration. 251.2 Section 251.2 Agriculture... Administration. (a) Food and Nutrition Service. Within the United States Department of Agriculture (the... this section, any information on changes in program administration, including any changes...

  17. Exploring the Experiences of Administrative Interns

    ERIC Educational Resources Information Center

    Jamison, Kimberly; Clayton, Jennifer

    2016-01-01

    Purpose: The purpose of this paper is to identify how current administrative interns enrolled in a university administrator preparation program describe and make meaning of their internship experiences. Design/methodology/approach: For this qualitative study, the researchers interviewed administrative interns enrolled in one university preparation…

  18. Pathways to the Humanities in Educational Administration.

    ERIC Educational Resources Information Center

    Popper, Samuel H.

    Based on the author's own experience as a professor of educational administration, this monograph is an argument for establishing a link between the humanities and instruction in school administration. Part I discusses the instrumental value of the humanities in administrative preparation and recounts the limitations of past attempts by the…

  19. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms...

  20. 14 CFR 1274.508 - Contract administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Contract administration. 1274.508 Section 1274.508 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.508 Contract administration. A system for...

  1. 14 CFR 1274.508 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Contract administration. 1274.508 Section 1274.508 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.508 Contract administration. A system for...

  2. 14 CFR 1274.508 - Contract administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Contract administration. 1274.508 Section 1274.508 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.508 Contract administration. A system for...

  3. 49 CFR 510.6 - Administrative depositions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Administrative depositions. 510.6 Section 510.6 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INFORMATION GATHERING POWERS § 510.6 Administrative depositions....

  4. 49 CFR 510.6 - Administrative depositions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Administrative depositions. 510.6 Section 510.6 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INFORMATION GATHERING POWERS § 510.6 Administrative depositions....

  5. Examining Academic and Administrative Productivity Measures.

    ERIC Educational Resources Information Center

    Middaugh, Michael F.; Hollowell, David E.

    1992-01-01

    The "academic ratchet and administrative lattice" framework for examining costs and productivity in college administration is applied to the University of Delaware. The productivity of academic units is analyzed quantitatively and issues in overstaffing and overbudgeting of administrative units are discussed. Faculty staffing trends from 1984-85…

  6. 10 CFR 603.600 - Administrative matters.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Administrative matters. 603.600 Section 603.600 Energy... Affecting Participants' Financial, Property, and Purchasing Systems § 603.600 Administrative matters. This subpart addresses “systemic” administrative matters that place requirements on the operation of...

  7. 10 CFR 603.600 - Administrative matters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Administrative matters. 603.600 Section 603.600 Energy... Affecting Participants' Financial, Property, and Purchasing Systems § 603.600 Administrative matters. This subpart addresses “systemic” administrative matters that place requirements on the operation of...

  8. 10 CFR 603.600 - Administrative matters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Administrative matters. 603.600 Section 603.600 Energy... Affecting Participants' Financial, Property, and Purchasing Systems § 603.600 Administrative matters. This subpart addresses “systemic” administrative matters that place requirements on the operation of...

  9. 10 CFR 603.600 - Administrative matters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Administrative matters. 603.600 Section 603.600 Energy... Affecting Participants' Financial, Property, and Purchasing Systems § 603.600 Administrative matters. This subpart addresses “systemic” administrative matters that place requirements on the operation of...

  10. 10 CFR 603.600 - Administrative matters.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Administrative matters. 603.600 Section 603.600 Energy... Affecting Participants' Financial, Property, and Purchasing Systems § 603.600 Administrative matters. This subpart addresses “systemic” administrative matters that place requirements on the operation of...

  11. 76 FR 72328 - Miscellaneous Administrative Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... SPACE ADMINISTRATION 48 CFR Part 1850 and 1852 RIN 2700-AD36 Miscellaneous Administrative Changes AGENCY... amends the NASA FAR Supplement (NFS) to make miscellaneous non-substantive administrative changes to be... Center Ombudsman. These changes are necessary to ensure consistency with the FAR and terminology...

  12. 24 CFR 320.9 - Pool administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Pool administration. 320.9 Section...-BACKED SECURITIES Pass-Through Type Securities § 320.9 Pool administration. The Association will only... prescribed by the Association. Pool administration requirements are set forth in such agreements or...

  13. 28 CFR 802.16 - Administrative appeal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Administrative appeal. 802.16 Section 802.16 Judicial Administration COURT SERVICES AND OFFENDER SUPERVISION AGENCY FOR THE DISTRICT OF... of appeal should be sent to the Office of the General Counsel, Court Services and...

  14. 28 CFR 802.16 - Administrative appeal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Administrative appeal. 802.16 Section 802.16 Judicial Administration COURT SERVICES AND OFFENDER SUPERVISION AGENCY FOR THE DISTRICT OF... of appeal should be sent to the Office of the General Counsel, Court Services and...

  15. 14 CFR 1275.106 - Administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Administrative actions. 1275.106 Section 1275.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION RESEARCH MISCONDUCT § 1275.106 Administrative actions. (a) Listed in paragraphs (a)(1) through (a)(3) of this section...

  16. 21 CFR 800.55 - Administrative detention.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Administrative detention. 800.55 Section 800.55 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... misbranded, until the Food and Drug Administration (FDA) has had time to consider what action it should...

  17. 21 CFR 800.55 - Administrative detention.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Administrative detention. 800.55 Section 800.55 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... misbranded, until the Food and Drug Administration (FDA) has had time to consider what action it should...

  18. 21 CFR 800.55 - Administrative detention.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Administrative detention. 800.55 Section 800.55 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... misbranded, until the Food and Drug Administration (FDA) has had time to consider what action it should...

  19. 21 CFR 800.55 - Administrative detention.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Administrative detention. 800.55 Section 800.55 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... misbranded, until the Food and Drug Administration (FDA) has had time to consider what action it should...

  20. 20 CFR 655.1050 - Administrative record.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Filed by Employers Utilizing F-1 Students in Off-Campus Work § 655.1050 Administrative record. The official record of every completed administrative hearing procedure provided by subpart K of this part... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Administrative record. 655.1050 Section...