Sample records for administration risk management

  1. Major Management Challenges and Program Risks: Small Business Administration

    DTIC Science & Technology

    2001-01-01

    2001 Major Management Challenges and Program Risks Small Business AdministrationGAO-01-260 Form SF298 Citation Data Report Date ("DD MON YYYY...34) 00JAN2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Small Business ...Administration (SBA) as it seeks to aid, counsel, assist, and protect the interests of the nations small businesses and help businesses and families

  2. 77 FR 51465 - Federal Housing Administration: Strengthening Risk Management Through Responsible FHA-Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    .... FR-5622-F-01] RIN 2502-AJ13 Federal Housing Administration: Strengthening Risk Management Through... strengthen the risk management practices of the Federal Housing Administration (FHA), HUD published a final... enforce its risk management regulations. DATES: Effective Date: September 24, 2012. FOR FURTHER...

  3. 7 CFR 2.44 - Administrator, Risk Management Agency and Manager, Federal Crop Insurance Corporation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for the transaction of the business of the Federal Crop Insurance Corporation and the Risk Management... 7 Agriculture 1 2010-01-01 2010-01-01 false Administrator, Risk Management Agency and Manager... Management Agency and Manager, Federal Crop Insurance Corporation. (a) Delegations. Pursuant to § 2.16(a)(4...

  4. 77 FR 11798 - Federal Housing Administration (FHA) Risk Management Initiatives: Revised Seller Concessions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 24 CFR Chapter II [Docket No. FR-5572-C-02] Federal Housing Administration (FHA) Risk Management Initiatives: Revised Seller Concessions; Addresses for the... Administration (FHA) Risk Management Initiatives: Revised Seller Concessions). 1. Submission of Comments by Mail...

  5. 75 FR 23582 - Federal Housing Administration: Continuation of FHA Reform-Strengthening Risk Management Through...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ...-AI81 Federal Housing Administration: Continuation of FHA Reform-- Strengthening Risk Management Through... Federal Housing Administration (FHA) that are designed to strengthen FHA by improving its management of risk. Although the preamble to the final rule correctly provides that the revised net worth...

  6. 75 FR 20717 - Federal Housing Administration: Continuation of FHA Reform; Strengthening Risk Management Through...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... Administration: Continuation of FHA Reform; Strengthening Risk Management Through Responsible FHA-Approved...) that are designed to strengthen FHA by improving its management of risk. This final rule increases the... designed to enhance FHA's risk management functions. The announcement preceded completion of an independent...

  7. 78 FR 75238 - Federal Housing Administration (FHA) Risk Management Initiatives: New Manual Underwriting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ...-AJ07 Federal Housing Administration (FHA) Risk Management Initiatives: New Manual Underwriting... the number of claims. FHA can control costs through risk management practices. The lower costs are a... insurance claim rates and risk of loss to FHA. \\1\\ U.S. Department of Housing and Urban Development, Annual...

  8. Ethics and risk management in administrative child and adolescent psychiatry.

    PubMed

    Sondheimer, Adrian

    2010-01-01

    This article examines ethics (the philosophic study of "doing the right thing") and risk management (the practice that seeks to manage the likelihood of "doing the wrong thing") and the relationship between them in the context of administrative child and adolescent psychiatry. Issues that affect child and adolescent psychiatrists who manage staff and business units and clinical practitioners who treat and manage individual patients are addressed. Malpractice, budgeting, credentialing, boundaries, assessment, documentation, treatment, research, dangerousness, and confidentiality are among the topics reviewed.

  9. Administration of the School District Risk Management Program. School Business Administration Publication No. 1.

    ERIC Educational Resources Information Center

    California Association of School Business Officials, Sacramento.

    This publication is designed to provide school district administrators and boards of education with information they can use in developing, administering, and evaluating their district's risk management needs. In particular, it is meant to help school officials 1) identify local insurance needs consistent with California's statutory requirements,…

  10. 78 FR 8551 - Federal Housing Administration (FHA) Risk Management Initiatives: Changes to Maximum Loan-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Administration (FHA) Risk Management Initiatives: Changes to Maximum Loan-to-Value Financing Solicitation of... performance of the portfolio, and adjust its standards to effectively manage financial risk. As a result, FHA has been continually evaluating its portfolio to identify and respond to risks in ways that benefit...

  11. Effective Management Techniques in Tertiary Administration: A Risk Management Framework.

    ERIC Educational Resources Information Center

    McNamara, R. P.; Booth, P.

    1984-01-01

    A management strategy that is potentially more fruitful for the nonprofit sector than traditional management toward a primary objective is a risk management approach to organizational effectiveness. The organization's effectiveness, its survival, can be analyzed by categorizing the risks facing it and assessing its performance in managing these…

  12. Cool Heads: Crisis Management for Administrators.

    ERIC Educational Resources Information Center

    Smiar, Nicholas P.

    1992-01-01

    Applies risk management models to child care administration. These models have been used by corporations to plan for crisis management. The formation of a crisis management policy and procedure is described, and features of effective communication during crises are outlined. (GLR)

  13. Manual of Educational Risk Management.

    ERIC Educational Resources Information Center

    Cody, Frank J.; Dise, John H., Jr.

    This is the first risk management publication for school administrators that attempts to be comprehensive by addressing all potential areas of risk to school districts and offering specific guidelines on how to manage those areas. Chapter 1 gives directions on how to use the manual. Chapter 2 contains a complete overview of risk management,…

  14. Perspectives: Intellectual Risk Management

    ERIC Educational Resources Information Center

    Hall, James C.

    2013-01-01

    Ask a college administrator about students and risk management, and you're likely to get a quick and agitated speech about alcohol consumption and bad behavior or a meditation on mental health and campus safety. But in colleges and universities, we manage intellectual risk-taking too. Bring that up, and you'll probably get little out of that same…

  15. Implementing the Deputy Administrator's Risk Characterization Memorandum, May 26, 1992

    EPA Pesticide Factsheets

    The purpose of this memorandum is to implement in the Superfund program the reccomendations of the Deputy Administrator in his memorandum of February 26, 1992, 'Guidance on risk characterization for risk managers and risk assessors.'

  16. ESMD Risk Management Workshop: Systems Engineering and Integration Risks

    NASA Technical Reports Server (NTRS)

    Thomas, L. Dale

    2005-01-01

    This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

  17. Risk evaluation mitigation strategies: the evolution of risk management policy.

    PubMed

    Hollingsworth, Kristen; Toscani, Michael

    2013-04-01

    The United States Food and Drug Administration (FDA) has the primary regulatory responsibility to ensure that medications are safe and effective both prior to drug approval and while the medication is being actively marketed by manufacturers. The responsibility for safe medications prior to marketing was signed into law in 1938 under the Federal Food, Drug, and Cosmetic Act; however, a significant risk management evolution has taken place since 1938. Additional federal rules, entitled the Food and Drug Administration Amendments Act, were established in 2007 and extended the government's oversight through the addition of a Risk Evaluation and Mitigation Strategy (REMS) for certain drugs. REMS is a mandated strategy to manage a known or potentially serious risk associated with a medication or biological product. Reasons for this extension of oversight were driven primarily by the FDA's movement to ensure that patients and providers are better informed of drug therapies and their specific benefits and risks prior to initiation. This article provides an historical perspective of the evolution of medication risk management policy and includes a review of REMS programs, an assessment of the positive and negative aspects of REMS, and provides suggestions for planning and measuring outcomes. In particular, this publication presents an overview of the evolution of the REMS program and its implications.

  18. Risk management of LPG transport activities in Hong Kong.

    PubMed

    Boult, M

    2000-01-07

    This paper gives a background to risk management of liquefied petroleum gas (LPG) transport activities, with special regard to the activities taking place in Hong Kong. In particular, it looks at the recent activities undertaken by the Government of the Hong Kong Special Administrative Region (SAR); the recent risk assessment of LPG transport in the Territory, the measures developed to minimise the risks (including risk management improvements) and the risk management activities undertaken by the Government and the operators.

  19. Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

    NASA Technical Reports Server (NTRS)

    Tompkins, F. G.

    1983-01-01

    This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

  20. International comparative analyses of healthcare risk management.

    PubMed

    Sun, Niuyun; Wang, Li; Zhou, Jun; Yuan, Qiang; Zhang, Zongjiu; Li, Youping; Liang, Minghui; Cheng, Lan; Gao, Guangming; Cui, Xiaohui

    2011-02-01

    Interpretation of the growing body of global literature on health care risk is compromised by a lack of common understanding and language. This series of articles aims to comprehensively compare laws and regulations, institutional management, and administration of incidence reporting systems on medical risk management in the United Kingdom, the United States, Canada, Australia, and Taiwan, so as to provide evidence and recommendations for health care risk management policy in China. We searched the official websites of the healthcare risk management agencies of the four countries and one district for laws, regulatory documents, research reports, reviews and evaluation forms concerned with healthcare risk management and assessment. Descriptive comparative analysis was performed on relevant documents. A total of 146 documents were included in this study, including 2 laws (1.4%), 17 policy documents (11.6%), 41 guidance documents (28.1%), 37 reviews (25.3%), and 49 documents giving general information (33.6%). The United States government implemented one law and one rule of patient safety management, while the United Kingdom and Australia each issued professional guidances on patient safety improvement. The four countries implemented patient safety management policy on four different levels: national, state/province, hospital, and non-governmental organization. The four countries and one district adopted four levels of patient safety management, and the administration modes can be divided into an "NGO-led mode" represented by the United States and Canada and a "government-led mode" represented by the United Kingdom, Australia, and Taiwan. © 2011 Blackwell Publishing Asia Pty Ltd and Chinese Cochrane Center, West China Hospital of Sichuan University.

  1. Improving regulatory capacity to manage risks associated with trade agreements.

    PubMed

    Walls, Helen L; Smith, Richard D; Drahos, Peter

    2015-03-21

    Modern trade negotiations have delivered a plethora of bilateral and regional preferential trade agreements (PTAs), which involve considerable risk to public health, thus placing demands on governments to strengthen administrative regulatory capacities in regard to the negotiation, implementation and on-going management of PTAs. In terms of risk management, the administrative regulatory capacity requisite for appropriate negotiation of PTAs is different to that for the implementation or on-going management of PTAs, but at all stages the capacity needed is expensive, skill-intensive and requires considerable infrastructure, which smaller and poorer states especially struggle to find. It is also a task generally underestimated. If states do not find ways to increase their capacities then PTAs are likely to become much greater drivers of health inequities. Developing countries especially struggle to find this capacity. In this article we set out the importance of administrative regulatory capacity and coordination to manage the risks to public health associated with PTAs, and suggest ways countries can improve their capacity.

  2. Financial risk management of pharmacy benefits.

    PubMed

    Saikami, D

    1997-10-01

    Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.

  3. Managing Risk on the Final Frontier

    NASA Technical Reports Server (NTRS)

    Lengyel, David M.; Newman, J. S.

    2009-01-01

    The National Aeronautics and Space Administration (NASA). Exploration Systems Mission Directorate (ESMD) has combined the Continuous Risk Management (CRM) discipline with innovative knowledge management (KM) practices to more effectively enable the accomplishment of work. CRM enables proactive problem identification and problem solving in the complex world of rocket science. while KM is used to improve this process.

  4. Teachers' and Administrators' Perceptions of Knowledge Management Competence of High School Administrators

    ERIC Educational Resources Information Center

    Memisoglu, Salih Pasa

    2016-01-01

    This study aims to determine the teachers' and administrators' perceptions of knowledge management competence in high school administration. The study was conducted using the screening model and the study group consisted of 162 teachers and 35 administrators working at eight high schools in Turkey. Administrators' knowledge management competence…

  5. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  6. 77 FR 20779 - Committee on Administration and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... Committee on Administration and Management AGENCY: Administrative Conference of the United States. ACTION... Administration and Management of the Assembly of the Administrative Conference of the United States. The meeting... Committees,'' and then on ``Committee on Administration and Management.'' Comments may be submitted by email...

  7. University Lawyers: A Study of Legal Risk, Risk Management and Role in Work Integrated Learning Programmes

    ERIC Educational Resources Information Center

    Cameron, Craig; Klopper, Christopher

    2015-01-01

    Work integrated learning (WIL) is in growing demand by multiple stakeholders within the higher education sector in Australia. There are significant and distinct legal risks to universities associated with WIL programmes. University lawyers, along with WIL administrators and university management, are responsible for managing legal risk. This…

  8. Data Management Guidance in the Context of Climate Risk-Management

    NASA Astrophysics Data System (ADS)

    Sylak-Glassman, E.

    2016-12-01

    Climate risk-management, while a national issue, often occurs at a local level. To prepare for the effects of climate change, community decision-makers require a diverse set of data from historical records, social science, observations, and models, much of which is collected and curated by Federal agencies. The President's Climate Action Plan calls for building stronger and safer communities and infrastructure to prepare the United States for the impacts of climate change, and the Obama Administration has prioritized making Federal data more discoverable, accessible, and usable to inform both climate risk-management, and other data-informed decisions. In order to understand the state of guidance for data provision for climate risk-management, we analyzed Federal, agency, and interagency documents such as the Common Framework for Earth-Observation Data, related to open data, climate data, and data management in general. We examined guidance related to the principles of data discovery, access, and ease of use, as well as the data management categories of application programming interfaces, controlled vocabularies and ontologies, metadata, persistent dataset identifiers, preservation, and usage metrics. This analysis showed both the extent of guidance provided, as well as gaps in guidance. Following the literature review, we held structured conversations with Federal climate data managers and tool developers to identify areas where further efforts could enhance provision of agency data for climate risk-management. Our analysis can be used by data managers to understand how various data management practices can help improve climate risk-management and where to find further guidance.

  9. Systematic implementation of clinical risk management in a large university hospital: the impact of risk managers.

    PubMed

    Sendlhofer, Gerald; Brunner, Gernot; Tax, Christa; Falzberger, Gebhard; Smolle, Josef; Leitgeb, Karina; Kober, Brigitte; Kamolz, Lars Peter

    2015-01-01

    For health care systems in recent years, patient safety has increasingly become a priority issue. National and international strategies have been considered to attempt to overcome the most prominent hazards while patients are receiving health care. Thereby, clinical risk management (CRM) plays a dominant role in enabling the identification, analysis, and management of potential risks. CRM implementation into routine procedures within complex hospital organizations is challenging, as in the past, organizational change strategies using a top-down approach have often failed. Therefore, one of our main objectives was to educate a certain number of risk managers in facilitating CRM using a bottom-up approach. To achieve our primary purpose, five project strands were developed, and consequently followed, introducing CRM: corporate governance, risk management (RM) training, CRM process, information, and involvement. The core part of the CRM process involved the education of risk managers within each organizational unit. To account for the size of the existing organization, we assumed that a minimum of 1 % of the workforce had to be trained in RM to disseminate the continuous improvement of quality and safety. Following a roll-out plan, CRM was introduced in each unit and potential risks were identified. Alongside the changes in the corporate governance, a hospital-wide CRM process was introduced resulting in 158 trained risk managers correlating to 2.0 % of the total workforce. Currently, risk managers are present in every unit and have identified 360 operational risks. Among those, 176 risks were scored as strategic and clustered together into top risks. Effective meeting structures and opportunities to share information and knowledge were introduced. Thus far, 31 units have been externally audited in CRM. The CRM approach is unique with respect to its dimension; members of all health care professions were trained to be able to identify potential risks. A network of risk

  10. 12 CFR 704.6 - Credit risk management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate... transaction counterparty, set as a percentage of capital. In addition to addressing deposits and securities...

  11. 12 CFR 704.6 - Credit risk management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate... transaction counterparty, set as a percentage of capital. In addition to addressing deposits and securities...

  12. 12 CFR 704.6 - Credit risk management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate... transaction counterparty, set as a percentage of capital. In addition to addressing deposits and securities...

  13. 12 CFR 704.6 - Credit risk management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate... transaction counterparty, set as a percentage of capital. In addition to addressing deposits and securities...

  14. Risk Management.

    ERIC Educational Resources Information Center

    Randal, L. Nathan

    This chapter of "Principles of School Business Management" presents an overview of risk management for school districts. The chapter first discusses four fundamental elements of risk management: (1) identifying and measuring risks; (2) reducing or eliminating risks; (3) transferring unassumable risks; and (4) assuming remaining risks.…

  15. Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    2002-01-01

    Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

  16. Risk management.

    PubMed

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  17. Construction Project Administration and Management for Mitigating Work Zone Accidents and Fatalities: An Integrated Risk Management Model

    DOT National Transportation Integrated Search

    2009-10-01

    The goal of this research is to mitigate the risk of highway accidents (crashes) and fatalities in work zones. The approach of this research has been to address the mitigation of work zone crashes through the creation of a formal risk management mode...

  18. Risk Management

    DTIC Science & Technology

    2011-06-02

    actively attack the risks, they will actively attack you.” -Tom Gib Why do Risk Management? 8 “The first step in the risk management process is to...opportunities to manage and improve our chances of success. - Roger Vanscoy “If you do not actively attack the risks, they will actively attack ...our risks provides opportunities to manage and improve our chances of success. - Roger Vanscoy “If you do not actively attack the risks, they will

  19. Development management for nursing administration.

    PubMed

    Heyden, R; Luyas, G; Henry, B

    1990-04-01

    What are the needs of a nurse administrator in a developing country? For that matter, what are the requirements for a nurse administrator in areas of lesser developed delivery in this country (e.g., care of the homeless, care of indigent populations)? Heyden, Luyas, and Henry look at the educational needs of these nurse managers and compare the needs to the typical education received in nursing administration programs.

  20. Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans

    NASA Astrophysics Data System (ADS)

    Neuhold, Clemens

    2013-04-01

    he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time

  1. Urban Tree Risk Management:A Community Guide to Program Design and Implementation

    Treesearch

    Jill Pokorny; Joseph O' Brien; Richard Hauer; Gary Johnson; Jana Albers; Peter Bedker; Manfred Mielke

    2003-01-01

    Urban Tree Risk Management: A Community Guide to Program Design and Implementation is a fully illustrated, easy to read training manual written for community leaders, administrators, city foresters, parks and public works staff, and private tree care practitioners. The manual is designed to assist communities design, adopt and implement tree risk management programs,...

  2. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  3. Risk management. National Aeronautics and Space Administration (NASA). Interim rule adopted as final with changes.

    PubMed

    2000-11-22

    This is a final rule amending the NASA FAR Supplement (NFS) to emphasize considerations of risk management, including safety, security (including information technology security), health, export control, and damage to the environment, within the acquisition process. This final rule addresses risk management within the context of acquisition planning, selecting sources, choosing contract type, structuring award fee incentives, administering contracts, and conducting contractor surveillance.

  4. A proposal for amending administrative law to facilitate adaptive management

    USGS Publications Warehouse

    Craig, Robin K.; Ruhl, J.B.; Brown, Eleanor D.; Williams, Byron K.

    2017-01-01

    In this article we examine how federal agencies use adaptive management. In order for federal agencies to implement adaptive management more successfully, administrative law must adapt to adaptive management, and we propose changes in administrative law that will help to steer the current process out of a dead end. Adaptive management is a form of structured decision making that is widely used in natural resources management. It involves specific steps integrated in an iterative process for adjusting management actions as new information becomes available. Theoretical requirements for adaptive management notwithstanding, federal agency decision making is subject to the requirements of the federal Administrative Procedure Act, and state agencies are subject to the states' parallel statutes. We argue that conventional administrative law has unnecessarily shackled effective use of adaptive management. We show that through a specialized 'adaptive management track' of administrative procedures, the core values of administrative law—especially public participation, judicial review, and finality— can be implemented in ways that allow for more effective adaptive management. We present and explain draft model legislation (the Model Adaptive Management Procedure Act) that would create such a track for the specific types of agency decision making that could benefit from adaptive management.

  5. Case histories in pharmaceutical risk management.

    PubMed

    McCormick, Cynthia G; Henningfield, Jack E; Haddox, J David; Varughese, Sajan; Lindholm, Anders; Rosen, Susan; Wissel, Janne; Waxman, Deborah; Carter, Lawrence P; Seeger, Vickie; Johnson, Rolley E

    2009-12-01

    The development and implementation of programs in the U.S. to minimize risks and assess unintended consequences of new medications has been increasingly required by the Food and Drug Administration (FDA) since the mid 1990s. This paper provides four case histories of risk management and post-marketing surveillance programs utilized recently to address problems associated with possible abuse, dependence and diversion. The pharmaceutical sponsors of each of these drugs were invited to present their programs and followed a similar template for their summaries that are included in this article. The drugs and presenting companies were OxyContin, an analgesic marketed by Purdue Pharma L.P., Daytrana and Vyvanse, ADHD medications marketed by Shire Pharmaceuticals, Xyrem for narcolepsy marketed by Jazz Pharmaceuticals, and Subutex and Suboxone for opioid dependence marketed by Reckitt Benckiser Pharmaceuticals Inc. These case histories and subsequent discussions provide invaluable real-world examples and illustrate both the promise of risk management programs in providing a path to market and/or for keeping on the market drugs with serious potential risks. They also illustrate the limitations of such programs in actually controlling unintended consequences, as well as the challenge of finding the right balance of reducing risks without posing undue barriers to patient access. These experiences are highly relevant as the FDA increasingly requires pharmaceutical sponsors to develop and implement the more formalized and enforceable versions of the risk management term Risk Evaluation and Mitigation Strategies (REMS).

  6. [Organizational wellbeing and psychosocial risk factors in a sample of Italian Public Administration work environments].

    PubMed

    Fida, Roberta; Gualandri, M; Avallone, F

    2011-01-01

    It has been recognized both by the scientific community and within the framework of social policies in Europe that the physical and psychosocial working environments pose potential risks for workers and organizational wellbeing. In particular psychosocial risks concern aspects of the design and management of work and its social and organizational contexts which have the potential for causing psychological or physical problems. This article examines the psychosocial risk factors of several types of Italian Public Administration offices (municipal, provincial, regional, central government, university, police headquarters, chamber of commerce, etc.) with the aim of obtaining a picture of the most problematic risk factors for each type. The participants of this survey consisted of about 23,500 employees of different types of Public Administration offices. The Multidimensional Organizational Health Questionnaire (MOHQ, 3) was used to collect the data. Results from ANOVA indicated that perceptions of fairness and job demands were the most problematic risk factors. Perception of safety at work was another problematic risk factor in specific types of work. The results revealed a high perception of stress in all workers over the entire range of the public administration offices studied.

  7. A proposal for amending administrative law to facilitate adaptive management

    NASA Astrophysics Data System (ADS)

    Craig, Robin K.; Ruhl, J. B.; Brown, Eleanor D.; Williams, Byron K.

    2017-07-01

    In this article we examine how federal agencies use adaptive management. In order for federal agencies to implement adaptive management more successfully, administrative law must adapt to adaptive management, and we propose changes in administrative law that will help to steer the current process out of a dead end. Adaptive management is a form of structured decision making that is widely used in natural resources management. It involves specific steps integrated in an iterative process for adjusting management actions as new information becomes available. Theoretical requirements for adaptive management notwithstanding, federal agency decision making is subject to the requirements of the federal Administrative Procedure Act, and state agencies are subject to the states’ parallel statutes. We argue that conventional administrative law has unnecessarily shackled effective use of adaptive management. We show that through a specialized ‘adaptive management track’ of administrative procedures, the core values of administrative law—especially public participation, judicial review, and finality— can be implemented in ways that allow for more effective adaptive management. We present and explain draft model legislation (the Model Adaptive Management Procedure Act) that would create such a track for the specific types of agency decision making that could benefit from adaptive management.

  8. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  9. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  10. Organizational Cultural Theory and Research Administration Knowledge Management

    ERIC Educational Resources Information Center

    Lehman, Dwayne W.

    2017-01-01

    The administration and management of sponsored projects spans many levels within an institution of higher education. Research administration professionals require an operational understanding of a complex and intertwined set of disciplines that include project management, finance, legal, ethics, communication, and business acumen. The explicit…

  11. Surveying perceptions of landslide risk management in Norway

    NASA Astrophysics Data System (ADS)

    Chiu, Jessica Ka Yi; Eidsvig, Unni

    2016-04-01

    Enhanced precipitation due to climate change leads to increase in both frequency and intensity of landslides in Norway. A proactive approach to risk management is therefore required to significantly reduce the losses associated with landslides. Opinions and perceptions from practitioners on the performance of landslide risk management can provide insights on areas for improvement in the landslide risk management strategies in Norway. The Risk Management Index (RMI), proposed by Cardona et al. (2004), is a well-established method to measure perceptions of disaster management of selected actors holistically. The RMI is measured based on opinion questionnaires to technical staff, decision-makers, and stakeholders involved in all stages of risk reduction strategies. It is a composite index that considers a wide variety of strategies to manage risks, including structural and non-structural measures, acceptance strategies, disaster management, and risk transfer. The RMI method was modified to be implemented in landslide hazards and to fit with Norwegian conditions. An opinion survey was conducted in autumn 2015 to measure perceptions of landslide risk management in Norway. Perceptions were surveyed for two time periods: 2015 and 2050, and are based on national, county, and municipality levels. Based on the survey results, performance of landslide risk management at any administrative levels in Norway is perceived to improve from `significant' in 2015 to `significant' to `outstanding' in 2050. Knowledge and technology, climate, risk perceptions, and anthropogenic activities are mostly considered by respondents for their 2050 perceptions. Several aspects of landslide risk management in Norway can be improved. For example, landslide hazard evaluation and mapping should be prioritised in Norway. Upgrading, retrofitting, and reconstruction of assets may also be included in the landslide risk reduction strategies. In addition, there should be more focus on inter

  12. 45 CFR 153.310 - Risk adjustment administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Risk adjustment administration. 153.310 Section 153.310 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS STANDARDS RELATED TO REINSURANCE, RISK CORRIDORS, AND RISK ADJUSTMENT UNDER THE AFFORDABLE CARE...

  13. 45 CFR 153.310 - Risk adjustment administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Risk adjustment administration. 153.310 Section 153.310 Public Welfare Department of Health and Human Services REQUIREMENTS RELATING TO HEALTH CARE ACCESS STANDARDS RELATED TO REINSURANCE, RISK CORRIDORS, AND RISK ADJUSTMENT UNDER THE AFFORDABLE CARE...

  14. 45 CFR 153.310 - Risk adjustment administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Risk adjustment administration. 153.310 Section 153.310 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS STANDARDS RELATED TO REINSURANCE, RISK CORRIDORS, AND RISK ADJUSTMENT UNDER THE AFFORDABLE CARE...

  15. [Global risk management].

    PubMed

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  16. Management of statin-intolerant high-risk patients.

    PubMed

    Tziomalos, Konstantinos; Athyros, Vasilios G; Karagiannis, Asterios; Mikhailidis, Dimitri P

    2010-09-01

    Statins are an essential part of the management of patients at high vascular risk and are generally well-tolerated. However, statin intolerance will be observed more frequently as more stringent low density lipoprotein cholesterol (LDL-C) targets are pursued in an ever increasing number of patients. We review the management options for high-risk patients intolerant to statin treatment. Potential strategies include switching to a different statin, reducing the frequency of statin administration, substituting statins with other LDL-C-lowering agents (e.g. ezetimibe, colesevelam or nicotinic acid) and combining low-dose statin treatment with other lipid-modifying drugs. A limited number of studies specifically assessed statin-intolerant patients and most were small and of short duration. It is therefore difficult to make evidence-based recommendations for the management of this population. In addition, all treatment options have limitations in terms of safety and/or efficacy.

  17. Managing the Cooperative Network: The Public Administration Model.

    ERIC Educational Resources Information Center

    Diener, Ronald E.

    1981-01-01

    Recommends that library administrators turn to public administration models in preference to business administration models for network management; this choice is predicated on the not-for-profit aspects of public service organizations. (RAA)

  18. Identifying Home Care Clinicians’ Information Needs for Managing Fall Risks

    PubMed Central

    Alhuwail, Dari

    2016-01-01

    Summary Objectives To help manage the risk of falls in home care, this study aimed to (i) identify home care clinicians’ information needs and how they manage missing or inaccurate data, (ii) identify problems that impact effectiveness and efficiency associated with retaining, exchanging, or processing information about fall risks in existing workflows and currently adopted health information technology (IT) solutions, and (iii) offer informatics-based recommendations to improve fall risk management interventions. Methods A case study was carried out in a single not-for-profit suburban Medicare-certified home health agency with three branches. Qualitative data were collected over a six month period through observations, semi-structured interviews, and focus groups. The Framework method was used for analysis. Maximum variation sampling was adopted to recruit a diverse sample of clinicians. Results Overall, the information needs for fall risk management were categorized into physiological, care delivery, educational, social, environmental, and administrative domains. Examples include a brief fall-related patient history, weight-bearing status, medications that affect balance, availability of caregivers at home, and the influence of patients’ cultures on fall management interventions. The unavailability and inaccuracy of critical information related to fall risks can delay necessary therapeutic services aimed at reducing patients’ risk for falling and thereby jeopardizing their safety. Currently adopted IT solutions did not adequately accommodate data related to fall risk management. Conclusion The results highlight the essential information for fall risk management in home care. Home care workflows and health IT solutions must effectively and efficiently retain, exchange, and process information necessary for fall risk management. Interoperability and integration of the various health IT solutions to make data sharing accessible to all clinicians is critical

  19. Earth, Wind, and Fire: Managing Risk in Today's Schools Part 1--Fire!

    ERIC Educational Resources Information Center

    Weeks, Richard

    2010-01-01

    If one word can characterize what may be troubling about risk management in today's schools, it is "complacency." Complacency is a negative behavior that could entrap people into letting their guard down. In "The School Business Administrator," authors Kenneth Stevenson and Don Tharpe write: "A successful school business administrator has a…

  20. Towards integrative risk management and more resilient societies

    NASA Astrophysics Data System (ADS)

    Al-Khudhairy, D.; Axhausen, K.; Bishop, S.; Herrmann, H.; Hu, B.; Kröger, W.; Lewis, T.; MacIntosh, J.; Nowak, A.; Pickl, S.; Stauffacher, D.; Tan, E.

    2012-11-01

    Society depends decisively on the availability of infrastructure systems such as energy, telecommunication, transportation, banking and finance, health care and governmental and public administration. Even selective damages of one of these infrastructures may result in disruptions of governmental, industrial or public functions. Vulnerability of infrastructures therefore provides spectacular leverage for natural disasters as well as criminal and terrorist actions. Threats and risks are part of the technological, economical, and societal development. This article focuses on the development and characterization of an integrative risk-management which, from the perspective of "resilient systems", can be seen as an innovative and pro-active crisis management approach dealing with the increasing amount of complexity in societies in a comprehensive, agile and adaptive way.

  1. Adolescent Risk Taking, Cocaine Self-Administration, and Striatal Dopamine Signaling

    PubMed Central

    Mitchell, Marci R; Weiss, Virginia G; Beas, B Sofia; Morgan, Drake; Bizon, Jennifer L; Setlow, Barry

    2014-01-01

    Poor decision making and elevated risk taking, particularly during adolescence, have been strongly linked to drug use; however the causal relationships among these factors are not well understood. To address these relationships, a rat model (the Risky Decision-making Task; RDT) was used to determine whether individual differences in risk taking during adolescence predict later propensity for cocaine self-administration and/or whether cocaine self-administration causes alterations in risk taking. In addition, the RDT was used to determine how risk taking is modulated by dopamine signaling, particularly in the striatum. Results from these experiments indicated that greater risk taking during adolescence predicted greater intake of cocaine during acquisition of self-administration in adulthood, and that adult cocaine self-administration in turn caused elevated risk taking that was present following 6 weeks of abstinence. Greater adolescent risk taking was associated with lower striatal D2 receptor mRNA expression, and pharmacological activation of D2/3 receptors in the ventral, but not dorsal, striatum induced a decrease in risk taking. These findings indicate that the relationship between elevated risk taking and cocaine self-administration is bi-directional, and that low striatal D2 receptor expression may represent a predisposing factor for both maladaptive decision making and cocaine use. Furthermore, these findings suggest that striatal D2 receptors represent a therapeutic target for attenuating maladaptive decision making when choices include risk of adverse consequences. PMID:24145852

  2. National Aeronautics and Space Administration Marshall Space Flight Center Space Transportation Directorate Risk Management Implementation Program

    NASA Technical Reports Server (NTRS)

    Duarte, Luis Alberto; Kross, Denny (Technical Monitor)

    2001-01-01

    The US civil aerospace program has been a great contributor to the creation and implementation of techniques and methods to identify, analyze, and confront risk. NASA has accomplished mission success in many instances, but also has had many failures. Anomalies have kept the Agency from achieving success on other occasions, as well. While NASA has mastered ways to prevent risks, and to quickly and effectively react and recover from anomalies or failures, it was not until few years ago that a comprehensive Risk Management process started being implemented in some of its programs and projects. A Continuous Risk Management (CRM) cycle process was developed and has been promoted and used successfully in programs and projects across the Agency.

  3. Derivatives and Risk Management in the Petroleum, Natural Gas, and Electricity Industries

    EIA Publications

    2002-01-01

    In February 2002 the Secretary of Energy directed the Energy Information Administration (EIA) to prepare a report on the nature and use of derivative contracts in the petroleum, natural gas, and electricity industries. Derivatives are contracts ('financial instruments') that are used to manage risk, especially price risk.

  4. Best practices: Use of an administrative review committee at New Hampshire Hospital to mitigate risk with high-profile patients.

    PubMed

    de Nesnera, Alexander; Folks, David G

    2010-07-01

    An increasing number of patients manifesting violent and aggressive behaviors are treated at New Hampshire Hospital. Over the past ten years, the volume of referrals on an involuntary emergency petition has increased 70%. New Hampshire Hospital has successfully initiated its Administrative Review Committee, which confers a risk management process to mitigate potential liability for the hospital and treating clinicians for these high-risk patients. This best practice is viewed as helpful by clinicians and by the hospital's legal counsel. Hospitals treating similar high-risk patients may also benefit from developing a similar committee and risk management process.

  5. Risk Management for Study Abroad Programs: Issues and Resources to Inform Program Development, Administration, and Training

    ERIC Educational Resources Information Center

    Rhodes, Gary

    2014-01-01

    This chapter provides a practical background to the health and safety risks and challenges for U.S. colleges and universities and other program providers. Potential risks, field-based guidelines, good practices, and resources to support the management of risks by study abroad offices will be covered.

  6. Risk Management: Earning Recognition with an Automated Safety Program

    ERIC Educational Resources Information Center

    Lansberry, Linden; Strasburger, Tom

    2012-01-01

    Risk management is a huge task that requires diligent oversight to avoid penalties, fines, or lawsuits. Add in the burden of limited resources that schools face today, and the challenge of meeting the required training, reporting, compliance, and other administrative issues associated with a safety program is almost insurmountable. Despite an…

  7. 48 CFR 252.245-7003 - Contractor Property Management System Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System Administration. 252.245-7003 Section 252.245-7003 Federal Acquisition Regulations System... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.245-7003 Contractor Property Management System Administration. As prescribed in 245.107, insert the following clause: CONTRACTOR PROPERTY MANAGEMENT SYSTEM...

  8. 17 CFR 200.25 - Office of Administrative and Personnel Management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... develops, implements, and evaluates the Commission's programs for human resources and personnel management... human resources management, the Associate Executive Director of the Office of Administrative and... Administrative and Personnel Management (OAPM) is responsible for providing a wide variety of programs for human...

  9. Risk Management Implementation Tool

    NASA Technical Reports Server (NTRS)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  10. Exploration Systems Development (ESD) Approach to Enterprise Risk Management

    NASA Technical Reports Server (NTRS)

    Bauder, Stephen P.

    2014-01-01

    The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration

  11. Risk Management in EVA

    NASA Technical Reports Server (NTRS)

    Hall, Jonathan; Lutomski, M.

    2006-01-01

    This viewgraph presentation reviews the use of risk management in Extravehicular Activities (EVA). The contents include: 1) EVA Office at NASA - JSC; 2) EVA Project Risk Management: Why and When; 3) EVA Office Risk Management: How; 4) Criteria for Closing a Risk; 5) Criteria for Accepting a Risk; 6) ISS IRMA Reference Card Data Entry Requirement s; 7) XA/ EVA Office Risk Activity Summary; 8) EVA Significant Change Summary; 9) Integrated Risk Management Application (XA) Matrix, March 31, 2004; 10) ISS Watch Item: 50XX Summary Report; and 11) EVA Project RM Usefulness

  12. Record Management in Nigerian Secondary School Administration

    ERIC Educational Resources Information Center

    Nakpodia, E. D.

    2009-01-01

    This paper examined the usefulness of record management in Nigerian Secondary Schools. Record keeping is one of the administrative principles in secondary school administration and it cannot be overemphasized in any organisation. The continuity of any school organisation depends on availability of useful records of past activities. In a complex…

  13. A Stress Management Primer for College Administrators.

    ERIC Educational Resources Information Center

    Cloud, Robert C.

    1991-01-01

    A discussion of stress and college administrators looks at two types of stress (eustress and distress), stress and the autonomic nervous system, the need for regular exercise as well as stress reduction activities, the influence of personality on stress, the sources and stages of burnout, and stress management for administrators. (MSE)

  14. Summary Report of the NASA Management Study Group: Recommendations to the Administrator, National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Phillips, Samuel C.

    1986-01-01

    The NASA Management Study Group (NMSG) was established under the auspices of the National Acedamy of Public Administration at the request of the Administrator of NASA to assess NASA's management practices and to evaluate the effectiveness of the NASA organization. This report summarizes the conclusions and recommendations of the NMSG on the overall management and organization of NASA.

  15. Financial Management in School Administration.

    ERIC Educational Resources Information Center

    Tronc, Keith, Ed.

    Because Australian school principals are being given increasing autonomy, knowledge of basic accounting principles and skill in elementary financial management are becoming more necessary. This book attempts to supply school administrators with information needed to handle new accounting duties and to lay a foundation for future fuller involvement…

  16. 77 FR 39387 - Loan Policies and Operations; Lending and Leasing Limits and Risk Management; Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... FARM CREDIT ADMINISTRATION 12 CFR Part 614 RIN 3052-AC60 Loan Policies and Operations; Lending and Leasing Limits and Risk Management; Effective Date AGENCY: Farm Credit Administration. ACTION: Notice of effective date. SUMMARY: The Farm Credit Administration (FCA or Agency), through the FCA Board (Board...

  17. Continuous Risk Management: An Overview

    NASA Technical Reports Server (NTRS)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  18. Comparisons of Food and Drug Administration and European Medicines Agency risk management implementation for recent pharmaceutical approvals: report of the International Society for Pharmacoeconomics and outcomes research risk benefit management working group.

    PubMed

    Lis, Yvonne; Roberts, Melissa H; Kamble, Shital; J Guo, Jeff; Raisch, Dennis W

    2012-12-01

    1) To compare the Food and Drug Administration's (FDA's) Risk Evaluation and Mitigation Strategies (REMS) and European Medicines Agency's (EMA's) Risk Management Plan (RMP) guidances and 2) to compare REMS and RMPs for specific chemical entities and biological products. FDA, EMA, and pharmaceutical company Web sites were consulted for details pertaining to REMS and RMPs. REMS requirements include medication guides, communication plans, elements to ensure safe use, implementation systems, and specified assessment intervals. RMP requirements are increased pharmacovigilance and risk minimization activities. We compared these requirements for drugs requiring both REMS and RMPs. We identified 95 drugs on FDA's REMS list as of March 2010. Of these, there were 29 drugs (11 biologics and 18 new chemical entities) with EMA RMPs. REMS and RMPs are similar in objectives, with comparable toolkits. Both allow flexibility in product-specific actions, recognizing adverse effects of potential concern. Of the 29 drugs reviewed, REMS requirements not included in RMPs were patient medication guides (100% of the drugs), provider communication plans (38%), and routine monitoring of REMS (66%). RMP requirements not included in REMS were specific adverse event reporting (45% of the drugs), prospective registry studies (34%), prospective epidemiology studies (24%), additional trial data (28%), and Summary of Product Characteristics contraindications (76%). Both REMS and RMPs provide positive guidance for identification, monitoring, and minimization of risk to patient safety. Currently, neither agency provides specific guidance on how risk should be related to benefit either qualitatively or quantitatively. Copyright © 2012 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  19. Management & Supervision Personnel Administration Training; General Reference.

    ERIC Educational Resources Information Center

    United States Government Printing Office, Washington, DC. Training and Career Development Div.

    This report lists 329 books in the library of the Training and Career Development Division of the Personnel Service. The books are listed under six categories. They are: personnel administration (46), management and supervision (60), general reference (57), training (20), American Management Association (AMA) publications (118), and United States…

  20. Communicating Risk to Program Managers

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  1. Managing the risks of risk management on large fires

    Treesearch

    Donald G. MacGregor; Armando González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  2. Planning the future of JPL's management and administrative support systems around an integrated database

    NASA Technical Reports Server (NTRS)

    Ebersole, M. M.

    1983-01-01

    JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.

  3. Telephone Care Management of Fall Risk:: A Feasibility Study.

    PubMed

    Phelan, Elizabeth A; Pence, Maureen; Williams, Barbara; MacCornack, Frederick A

    2017-03-01

    Care management has been found to be more effective than usual care for some chronic conditions, but few studies have tested care management for prevention of elder falls. This study aimed to assess the feasibility and preliminary efficacy of telephone care management of older adults presenting for medical attention due to a fall. The setting was an independent practice association in western Washington serving 1,300 Medicare Advantage-insured patients. Patients aged ≥65 years treated for a fall in an emergency department or their primary care provider's office were contacted via telephone by a care manager within 48 hours of their fall-related visit and invited to participate in a telephone-administered interview to identify modifiable fall risk factors and receive recommendations and follow-up to address identified risk factors. Data from care manager records, patient medical records, and healthcare claims for the first 6 months (November 2009-April 2010) of program implementation were analyzed in 2011. The feasibility of screening and management of fall risk factors over the telephone and the effect on medically attended falls were assessed. Twenty-two patients eligible for fall care management were reached and administered the protocol. Administration took 15-20 minutes and integrated easily with the care manager's other responsibilities. Follow-through on recommendations varied, from 45% for those for whom exercise participation was recommended to 100% for other recommendations. No medically attended falls occurred over 6 months of follow-up. Telephone care management of fall risk appears feasible and may reduce falls requiring medical attention. Copyright © 2016 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  4. Risk management and post-marketing surveillance of CNS drugs.

    PubMed

    Henningfield, Jack E; Schuster, Charles R

    2009-12-01

    Drugs affecting the central nervous system span a broad range of chemical entities, dosage forms, indications, and risks. Unintended consequences include potential abuse and overdose in non-patient drug abusers, deliberate tampering of drug dosage forms, and criminal behavior associated with diversion. Regulators must consider diverse factors to find the appropriate conditions of approval to minimize unintended consequences while enabling a level of access desired by health care providers and patients. This commentary appears as part of a special issue of Drug and Alcohol Dependence that focuses on risk management and post-marketing surveillance and addresses key issues that pose real-world challenges to pharmaceutical sponsors and regulators in particular. For example, in the U.S., Controlled Substances Act drug scheduling can be considered a risk management strategy but its legal authorities and administrative processes are independent from those of risk management (including Risk Evaluation and Mitigation Strategies or REMS); better harmonization of these approaches is vital from drug development and regulatory perspectives. Risk management would ideally be implemented on a strong science foundation demonstrating that the tools employed to mitigate risks and ensure safe use are effective. In reality, research and evaluation of tools in this area is in its infancy and will necessarily be an evolutionary process; furthermore, there is little precedent for linking interventions and program evolution to unintended consequences such as regional outbreaks of abuse and diversion. How such issues are resolved has the potential to stimulate or stifle innovations in drug development and advance or imperil health care.

  5. [From personnel administration to human resource management : demographic risk management in hospitals].

    PubMed

    Schmidt, C E; Gerbershagen, M U; Salehin, J; Weib, M; Schmidt, K; Wolff, F; Wappler, F

    2011-06-01

    The healthcare market is facing a serious shortage of qualified personnel in 2020. Aging of staff members is one important driver of this human resource deficit but current planning periods of 1-2 years cannot compensate the demographic effects on staff portfolio early enough. Therefore, prospective human resource planning is important to avoid loss of competence. The long range development (10 years) of human resources in the hospitals of the City of Cologne was analyzed. The basis for the analysis was a simulation model that included fluctuation of staff, retirement, maternity leave, status of employee illness, partial retirement and fresh engagements per department and profession. The model was matched with the staff requirements for each department. The results showed a capacity analysis which was used to convey strategic measures for staff recruitment and retention. The greatest risk for shortage of qualified staff was found in the fluctuation of doctors and in the aging work force. Without strategic human resource management the hospitals would face a 50% reduction of the work force within 10 years and after 2 years there would be a 25% deficit of anesthesiologists with impact on the function of operation rooms (OR) and intensive care units. Qualification and continuous training of staff members as well as process optimization are the most important spheres of activity for human resource management in order to recruit and retain qualified staff members. Prospective human resource planning for the OR and intensive care units can help to detect shortage of staff and loss of competence early enough to apply effective personnel development measures. A growing number of companies have started to plan ahead of the current demand of human resources. Hospitals should follow this example because the competition for qualified staff members is increasing rapidly.

  6. Clinical risk management.

    PubMed

    Knowles, D

    Managing clinical risk involves all staff with clinical and managerial responsibilities. This article draws attention to some key steps in risk management and ways to deal with the problems when things do go wrong.

  7. 41 CFR 105-1.101 - General Services Administration Property Management Regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-INTRODUCTION 1.1-Regulations System § 105-1.101 General Services Administration Property Management Regulations... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false General Services Administration Property Management Regulations. 105-1.101 Section 105-1.101 Public Contracts and Property...

  8. Effective Instructional Management: Perceptions and Recommendations from High School Administrators

    ERIC Educational Resources Information Center

    Knechtel, Troy

    2010-01-01

    The two overarching research questions of this study are: What are the perceptions of high school administrators regarding the effectiveness of their current approach to instructional management? What recommendations do high school administrators have for effective strategies for instructional management? To answer these questions, a qualitative…

  9. Risk transfer and accountability in managed care organizations' carve-out contracts.

    PubMed

    Garnick, D W; Horgan, C M; Hodgkin, D; Merrick, E L; Goldin, D; Ritter, G; Skwara, K C

    2001-11-01

    This study examined characteristics of contracts between managed care organizations (MCOs) and managed behavioral health organizations (MBHOs) in terms of delegation of functions, financial arrangements between the MCO and the MBHO, and the use of performance standards. Nationally representative administrative and clinical information about the three largest types of commercial products offered by 434 MCOs in 60 market areas was gathered by telephone survey. These products comprised services provided by health maintenance organizations, preferred provider organizations, and point-of-service plans. Chi square tests were performed between pairings of all three types of products to ascertain differences in the degree to which claims processing, maintenance of provider networks, utilization management, case management, and quality improvement were delegated to MBHOs through specialty contracts among the various types of products. Contractual specifications about capitation arrangements, risk sharing, the use of performance standards, and final utilization review decisions were also compared. For all types of products, almost all the major functions were contracted by the MCO to the MBHO. Although most contracts assigned some risk for the costs of services to the MBHO, the degree of this risk varied by product type. Except in the case of preferred-provider organizations, a large number of performance standards were identified in MCOs' contracts with MBHOs, although financial incentives were rarely tied to such standards. MCOs that contract with MBHOs place major responsibility, both financial and administrative, on the vendors.

  10. Risk Management and Adaptation Transition Mechanisms and Pathways in New York City

    NASA Astrophysics Data System (ADS)

    Link, H. D.

    2016-12-01

    Understanding the values that drive current decision-making is essential to effective management of critical urban infrastructure. As urban infrastructure becomes increasingly interconnected, risks in one sector can translate to citywide risk in the flash of a photon or the blink of an eye. Approaches and goals of risk management vary across geographies. Administrators and residents attempt to reduce vulnerability to hazards and limit the scope of disasters in different ways in different contexts. Public and personal risk management decision making regimes are complex and often shifting. While the overarching goal is to try to reduce the level of risk faced by stakeholders in a particular locale, the conditions and changing character of local risk management decisions are affected by physical, economic and social factors. Opportunities for meaningful action are found at this nexus. To illuminate this nexus, this paper provides a detailed discussion and analysis of the New York City risk management regime and its trajectory as defined by local experts. The risk focus of the analysis is storm surge and flooding, and heat stress. The analysis examines the factors that enable movement and transition between different adaptive regimes, and on factors that support lock-in of current regime status The research utilizes a risk management framework based on four policy states developed for the Transformation and Resilience in the Urban Coast (TRUC) project (Solecki et al. 2016). "Collapse"; a state where there is no strategic risk planning; "Resistance"; risk planning that is directed at stability and aims at protecting current development pathways; "Resilience"; flexible planning that aims at introducing some changes to maintain current development, and "Transformation"; planning for fundamental changes in risk management including changing development choices and paths to accommodate uncertainty and future risk scenarios. (Solecki et al. 2016). To examine the risk

  11. 75 FR 10490 - Joint Meeting of the Arthritis Drugs Advisory Committee and the Drug Safety and Risk Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001] Joint Meeting of the Arthritis Drugs Advisory Committee and the Drug Safety and Risk Management Advisory... Drug Safety and Risk Management Advisory Committee. General Function of the Committees: To provide...

  12. International Conference on Harmonisation; guidance on Q9 Quality Risk Management; availability. Notice.

    PubMed

    2006-06-02

    The Food and Drug Administration (FDA) is announcing the availability of a guidance entitled "Q9 Quality Risk Management."' The guidance was prepared under the auspices of the International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals for Human Use (ICH). The guidance provides principles and examples of tools for quality risk management that can be applied to all aspects of pharmaceutical quality throughout the lifecycle of drug substances, drug products, and biological and biotechnological products. The guidance is intended to enable regulators and industry to make more effective and consistent risk-based decisions.

  13. Redesigning financial management education for the nursing administration graduate student.

    PubMed

    Lemire, J A

    2000-04-01

    The changes and expansion in the nurse administrator role indicate a need for a specialized body of financial knowledge and skills for making system focused decisions that integrate the clinical and business aspects of healthcare. A survey of nurse administrators and chief executive officers showed high agreement on the important financial management concepts to the nurse administrator role. A graduate level financial management course that includes concepts for course content and practice applications is proposed.

  14. Risk Management Issues - An Aerospace Perspective

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  15. Administrative Office Managers' Utilization of Participative Management in Supervising Office Employees.

    ERIC Educational Resources Information Center

    Quible, Zane K.

    An analysis was undertaken of the self-perceived role of administrative office managers in participative management. The primary purpose of the study was to enable office educators to develop relevant instructional programs based on current practices found in the business world. Data were compiled from 132 usable questionnaire responses returned…

  16. Psychiatric Management, Administration, and Leadership: a Continuum or Distinct Concepts?

    PubMed

    Saeed, Sy Atezaz; Silver, Stuart; Buwalda, Victor J A; Khin, Eindra Khin; Petit, Jorge R; Mohyuddin, Farooq; Weinberg, Pamela; Merlino, Joseph P; Lekwauwa, Nena; Levin, Saul

    2018-06-01

    To clarify the relationship between the concepts of management, administration, and leadership in psychiatry. The authors provide a review of the conceptual evolution of administrative psychiatry and develop operational definitions of these three domains. Based upon their experiences, they discuss relevant core competencies and personal attributes. The authors found that the terms psychiatric management, psychiatric administration, and psychiatric leadership are often used interchangeably, yet they each have a different and distinct focus. Additionally, some in the field consider the concepts overlapping, existing on a continuum, while others draw distinct conceptual boundaries between these terms. Psychiatrists in leadership positions function in all three domains. While these are distinct concepts, the authors recommend that administrative psychiatrists integrate all three in their everyday work. The authors suggest the distinctions among these concepts should inform training and identify core competencies related to these distinctions. Mentoring should focus on the practical integration of the concepts of management, administration, and leadership in administrative psychiatry. The authors present a cohesive framework for future development of a curriculum for education and research.

  17. Decisionmaking under risk in invasive species management: risk management theory and applications

    Treesearch

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  18. Contract Administration: Understanding Limitations on Management Rights. A Presenter's Guide. Research Based Training for School Administrators.

    ERIC Educational Resources Information Center

    Oregon Univ., Eugene. Center for Educational Policy and Management.

    This workshop presenter's guide is intended for use by administrators in training one another in the Project Leadership program developed by the Association of California School Administrators (ACSA). The purpose of this particular guide is to train administrators to interpret common contract provisions that affect management's decision-making…

  19. 25 CFR 122.8 - Administrative costs for management of the fund.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Administrative costs for management of the fund. 122.8 Section 122.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES MANAGEMENT OF OSAGE JUDGMENT FUNDS FOR EDUCATION § 122.8 Administrative costs for management of the fund. Funds...

  20. Risk management frameworks for human health and environmental risks.

    PubMed

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    A comprehensive analytical review of the risk assessment, risk management, and risk communication approaches currently being undertaken by key national, provincial/state, territorial, and international agencies was conducted. The information acquired for review was used to identify the differences, commonalities, strengths, and weaknesses among the various approaches, and to identify elements that should be included in an effective, current, and comprehensive approach applicable to environmental, human health and occupational health risks. More than 80 agencies, organizations, and advisory councils, encompassing more than 100 risk documents, were examined during the period from February 2000 until November 2002. An overview was made of the most important general frameworks for risk assessment, risk management, and risk communication for human health and ecological risk, and for occupational health risk. In addition, frameworks for specific applications were reviewed and summarized, including those for (1)contaminated sites; (2) northern contaminants; (3) priority substances; (4) standards development; (5) food safety; (6) medical devices; (7) prescription drug use; (8) emergency response; (9) transportation; (10) risk communication. Twelve frameworks were selected for more extensive review on the basis of representation of the areas of human health, ecological, and occupational health risk; relevance to Canadian risk management needs; representation of comprehensive and well-defined approaches; generalizability with their risk areas; representation of "state of the art" in Canada, the United States, and/or internationally; and extent of usage of potential usage within Canada. These 12 frameworks were: 1. Framework for Environmental Health Risk Management (US Presidential/Congressional Commission on Risk Assessment and Risk Management, 1997). 2. Health Risk Determination: The Challenge of Health Protection (Health and Welfare Canada, 1990). 3. Health Canada Decision

  1. Professional Education Programme for Land Management and Land Administration in Cambodia

    ERIC Educational Resources Information Center

    Setha, Vung; Mund, Jan-Peter

    2008-01-01

    Land management and land administration are defined as a system of planning, management and administration methods and techniques that aims to integrate ecological with social, economic and legal principles in the management of land for urban and rural development purposes. The main objective is to meet changing and developing human needs, while…

  2. Information Risk Management and Resilience

    NASA Astrophysics Data System (ADS)

    Dynes, Scott

    Are the levels of information risk management efforts within and between firms correlated with the resilience of the firms to information disruptions? This paper examines the question by considering the results of field studies of information risk management practices at organizations and in supply chains. The organizations investigated differ greatly in the degree of coupling from a general and information risk management standpoint, as well as in the levels of internal awareness and activity regarding information risk management. The comparison of the levels of information risk management in the firms and their actual or inferred resilience indicates that a formal information risk management approach is not necessary for resilience in certain sectors.

  3. Continuous Risk Management at NASA

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  4. Probability concepts in quality risk management.

    PubMed

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  5. Cardiac arrest risk standardization using administrative data compared to registry data.

    PubMed

    Grossestreuer, Anne V; Gaieski, David F; Donnino, Michael W; Nelson, Joshua I M; Mutter, Eric L; Carr, Brendan G; Abella, Benjamin S; Wiebe, Douglas J

    2017-01-01

    Methods for comparing hospitals regarding cardiac arrest (CA) outcomes, vital for improving resuscitation performance, rely on data collected by cardiac arrest registries. However, most CA patients are treated at hospitals that do not participate in such registries. This study aimed to determine whether CA risk standardization modeling based on administrative data could perform as well as that based on registry data. Two risk standardization logistic regression models were developed using 2453 patients treated from 2000-2015 at three hospitals in an academic health system. Registry and administrative data were accessed for all patients. The outcome was death at hospital discharge. The registry model was considered the "gold standard" with which to compare the administrative model, using metrics including comparing areas under the curve, calibration curves, and Bland-Altman plots. The administrative risk standardization model had a c-statistic of 0.891 (95% CI: 0.876-0.905) compared to a registry c-statistic of 0.907 (95% CI: 0.895-0.919). When limited to only non-modifiable factors, the administrative model had a c-statistic of 0.818 (95% CI: 0.799-0.838) compared to a registry c-statistic of 0.810 (95% CI: 0.788-0.831). All models were well-calibrated. There was no significant difference between c-statistics of the models, providing evidence that valid risk standardization can be performed using administrative data. Risk standardization using administrative data performs comparably to standardization using registry data. This methodology represents a new tool that can enable opportunities to compare hospital performance in specific hospital systems or across the entire US in terms of survival after CA.

  6. A challenge for land and risk managers: differents stakeholders, differents definitions of the risks

    NASA Astrophysics Data System (ADS)

    Fernandez, M.; Ruegg, J.

    2012-04-01

    In developing countries, mountain populations and territories are subject to multiple risks and vulnerabilities. In addition, they face even greater challenges than developed countries due to lack of knowledge, resources and technology. There are many different types of actors in society that manage risk at various scales and levels (i.e. engineers, geologists, administrators, land use planners, merchants and local indigenous and non-indigenous people). Because of limited resources and possibilities to reduce all types of risk, these different actors, or 'risk managers' have to choose and compete to prioritize which types of risks to address. This paper addresses a case study from San Cristobal Altaverapaz, Guatemala where a large landslide "Los Chorros", a catastrophic collapse of 6 millions cubic meters of rock, is affecting several communities and one of the country's main west-east access highways. In this case, the government established that the "primary" risk is the landslide, whereas other local stakeholders consider the primary risks to be economic This paper, situated at the cross section between political science, geography and disaster risk management, addresses the social conflict and competition for priorities and solutions for risk management, depending on the group of actors based on the on-going Los Chorros, Guatemala landslide mitigation process. This work is based on the analysis of practices, (Practical Science), policies and institutions in order to understand how the inclusion of multiple stakeholders in determining risk priorities can lead to more sustainable risk management in a given territory. The main objective of this investigation is first to identify and understand the juxtaposition of different readings of the risk equation, usually considered the interface between vulnerability, exposure and hazards. Secondly, it is to analyze the mechanisms of actions taken by various stakeholders, or risk managers. The analysis focuses on the

  7. Site-Based Management: Implications for Risk Management?

    ERIC Educational Resources Information Center

    Dunklee, Dennis R.

    1990-01-01

    Site-based school management opens the possibility of problems in districtwide risk management and liability prevention programs. Describes a program to transfer prevention law and risk management strategies to individual school sites. Cautions that only duly authorized agents of local school boards can commit boards to contractual obligations.…

  8. Cardiac arrest risk standardization using administrative data compared to registry data

    PubMed Central

    Gaieski, David F.; Donnino, Michael W.; Nelson, Joshua I. M.; Mutter, Eric L.; Carr, Brendan G.; Abella, Benjamin S.; Wiebe, Douglas J.

    2017-01-01

    Background Methods for comparing hospitals regarding cardiac arrest (CA) outcomes, vital for improving resuscitation performance, rely on data collected by cardiac arrest registries. However, most CA patients are treated at hospitals that do not participate in such registries. This study aimed to determine whether CA risk standardization modeling based on administrative data could perform as well as that based on registry data. Methods and results Two risk standardization logistic regression models were developed using 2453 patients treated from 2000–2015 at three hospitals in an academic health system. Registry and administrative data were accessed for all patients. The outcome was death at hospital discharge. The registry model was considered the “gold standard” with which to compare the administrative model, using metrics including comparing areas under the curve, calibration curves, and Bland-Altman plots. The administrative risk standardization model had a c-statistic of 0.891 (95% CI: 0.876–0.905) compared to a registry c-statistic of 0.907 (95% CI: 0.895–0.919). When limited to only non-modifiable factors, the administrative model had a c-statistic of 0.818 (95% CI: 0.799–0.838) compared to a registry c-statistic of 0.810 (95% CI: 0.788–0.831). All models were well-calibrated. There was no significant difference between c-statistics of the models, providing evidence that valid risk standardization can be performed using administrative data. Conclusions Risk standardization using administrative data performs comparably to standardization using registry data. This methodology represents a new tool that can enable opportunities to compare hospital performance in specific hospital systems or across the entire US in terms of survival after CA. PMID:28783754

  9. Multi-hazard risk analysis for management strategies

    NASA Astrophysics Data System (ADS)

    Kappes, M.; Keiler, M.; Bell, R.; Glade, T.

    2009-04-01

    Risk management is very often operating in a reactive way, responding to an event, instead of proactive starting with risk analysis and building up the whole process of risk evaluation, prevention, event management and regeneration. Since damage and losses from natural hazards raise continuously more and more studies, concepts (e.g. Switzerland or South Tyrol-Bolozano) and software packages (e.g. ARMAGEDOM, HAZUS or RiskScape) are developed to guide, standardize and facilitate the risk analysis. But these approaches focus on different aspects and are mostly closely adapted to the situation (legislation, organization of the administration, specific processes etc.) of the specific country or region. We propose in this study the development of a flexible methodology for multi-hazard risk analysis, identifying the stakeholders and their needs, processes and their characteristics, modeling approaches as well as incoherencies occurring by combining all these different aspects. Based on this concept a flexible software package will be established consisting of ArcGIS as central base and being complemented by various modules for hazard modeling, vulnerability assessment and risk calculation. Not all modules will be developed newly but taken from the current state-of-the-art and connected or integrated into ArcGIS. For this purpose two study sites, Valtellina in Italy and Bacelonnette in France, were chosen and the hazards types debris flows, rockfalls, landslides, avalanches and floods are planned to be included in the tool for a regional multi-hazard risk analysis. Since the central idea of this tool is its flexibility this will only be a first step, in the future further processes and scales can be included and the instrument thus adapted to any study site.

  10. Controlling Legal Risk for Effective Hospital Management

    PubMed Central

    Park, Hyun Jun; Cho, Duk Young; Park, Yong Sug; Kim, Sun Wook; Park, Jae-Hong

    2016-01-01

    Purpose To analyze the types of medical malpractice, medical errors, and medical disputes in a university hospital for the proposal of countermeasures that maximize the efficiency of hospital management, medical departments, and healthcare providers. Materials and Methods This study retrospectively reviewed and analyzed 55 closed civil lawsuits among 64 medical lawsuit cases carried out in Pusan National University Hospital from January 2000 to April 2013 using medical records, petitions, briefs, and data from the Medical Dispute Mediation Committee. Results Of 55 civil lawsuits, men were the main plaintiffs in 31 cases (56.4%). The average period from medical malpractice to malpractice proceeding was 16.5 months (range, 1 month to 6.4 years), and the average period from malpractice proceeding to the disposition of a lawsuit was 21.7 months (range, 1 month to 4 years and 11 months). Conclusions Hospitals can effectively manage their legal risks by implementing a systematic medical system, eliminating risk factors in administrative service, educating all hospital employees on preventative strategies, and improving customer service. Furthermore, efforts should be made to establish standard coping strategies to manage medical disputes and malpractice lawsuits, operate alternative dispute resolution methods including the Medical Dispute Mediation Committee, create a compliance support center, deploy a specialized workforce including improved legal services for employees, and specialize the management-level tasks of the hospital. PMID:27169130

  11. Management of Low-Risk Pulmonary Embolism Patients Without Hospitalization: The Low-Risk Pulmonary Embolism Prospective Management Study.

    PubMed

    Bledsoe, Joseph R; Woller, Scott C; Stevens, Scott M; Aston, Valerie; Patten, Rich; Allen, Todd; Horne, Benjamin D; Dong, Lydia; Lloyd, James; Snow, Greg; Madsen, Troy; Elliott, C Gregory

    2018-02-02

    The efficacy and safety of managing patients with low-risk pulmonary embolism (PE) without hospitalization requires objective data from US medical centers. We sought to determine the 90-day composite rate of recurrent symptomatic VTE, major bleeding events, and all-cause mortality among consecutive patients diagnosed with acute low-risk PE managed without inpatient hospitalization; and to measure patient satisfaction. We performed a prospective cohort single-arm management study conducted from January 2013 to October 2016 in five EDs. We enrolled 200 consecutive adults diagnosed with objectively confirmed acute PE and assessed to have a low risk for mortality using the Pulmonary Embolism Severity Index (PESI) score (< 86), echocardiography, and whole-leg compression ultrasound (CUS). The primary intervention was observation in the ED or hospital (observation status) for > 12 to < 24 h, followed by outpatient management with Food and Drug Administration-approved therapeutic anticoagulation. Patients were excluded for a PESI ≥ 86, echocardiographic signs of right heart strain, DVT proximal to the popliteal vein, hypoxia, hypotension, hepatic or renal failure, contraindication to therapeutic anticoagulation, or another condition requiring hospital admission. The primary outcome was 90-day composite rate of all-cause mortality, recurrent symptomatic VTE, and major bleeding. The composite outcome occurred in one of 200 patients (90-day composite rate = 0.5%; 95% CI, 0.02%-2.36%). No patient suffered recurrent VTE or died during the 90-day follow-up period. A major bleed occurred in one patient. Patients indicated a high level of satisfaction with their care. Treatment of carefully selected patients with acute PE and low risk by PESI < 86, echocardiography, and CUS without inpatient hospitalization is safe and acceptable to patients. Results must be viewed with caution because of the small sample size relative to the end point and the generalizability surrounding

  12. Hospital administrative characteristics and volunteer resource management practices.

    PubMed

    Intindola, Melissa; Rogers, Sean; Flinchbaugh, Carol; Della Pietra, Doug

    2016-05-16

    Purpose - The purpose of this paper is to explore the links between various characteristics of hospital administration and the utilization of classes of volunteer resource management (VRM) practices. Design/methodology/approach - This paper uses original data collected via surveys of volunteer directors in 122 hospitals in five Northeastern and Southern US states. Findings - Structural equation modeling results suggest that number of paid volunteer management staff, scope of responsibility of the primary volunteer administrator, and hospital size are positively associated with increased usage of certain VRM practices. Research limitations/implications - First, the authors begin the exploration of VRM antecedents, and encourage others to continue this line of inquiry; and second, the authors assess dimensionality of practices, allowing future researchers to consider whether specific dimensions have a differential impact on key individual and organizational outcomes. Practical implications - Based on the findings of a relationship between administrative characteristics and the on-the-ground execution of VRM practice, a baseline audit comparing current practices to those VRM practices presented here might be useful in determining what next steps may be taken to focus investments in VRM that can ultimately drive practice utilization. Originality/value - The exploration of the dimensionality of volunteer management adds a novel perspective to both the academic study, and practice, of volunteer management. To the authors' knowledge, this is the first empirical categorization of VRM practices.

  13. Risk Management Structured for Today's Environment

    NASA Technical Reports Server (NTRS)

    Greenfield, Michael A.

    1998-01-01

    In NPG (NASA Procedures and Guidelines) 7120.5A, we define risk management as "an organized, systematic decision-making process that efficiently identifies, analyzes, plans, tracks, controls, and communicates and documents risk in order to increase the likelihood of achieving program/project goals." Effective risk management depends upon a thorough understanding of the concept of risk, the principles of risk management and the formation of a disciplined risk management process. In human spaceflight programs, NASA has always maintained a rigorous and highly structured risk management effort. When lives are at stake, NASA's missions must be 100% safe; the risk management approach used in human spaceflight has always been comprehensive.

  14. Project TEAMS (Techniques and Education for Achieving Management Skills): Health Care Administrators.

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    These Project TEAMS (Techniques and Education for Achieving Management Skills) instructional materials consist of five units for use in training health care administrators. Unit 1 contains materials designed to help the health care administrators increase their management skills in regard to self-awareness, time management, problem solving,…

  15. Continuous Risk Management Course. Revised

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.

    1999-01-01

    This document includes a course plan for Continuous Risk Management taught by the Software Assurance Technology Center along with the Continuous Risk Management Guidebook of the Software Engineering Institute of Carnegie Mellon University and a description of Continuous Risk Management at NASA.

  16. Succession Management: A Necessary Strategy for Rural School Administration.

    ERIC Educational Resources Information Center

    Wallin, Dawn C.

    This paper discusses succession planning for rural educational administrators, focusing on management succession practices, responsibilities, and policies that ensure the efficient and effective transition of rural administrators. In planning their human resources, all organizations must match the needs of the organization with the shifting needs…

  17. Strategic plan modelling by hospital senior administration to integrate diversity management.

    PubMed

    Newhouse, John J

    2010-11-01

    Limited research suggests that some hospital senior administrators and chief executive officers (CEOs) have employed a strategic planning function to achieve diversity management practices. As the hospital industry struggles with how to integrate diversity practices to improve patient satisfaction, increase the quality of care and enhance clinical outcomes for minority populations, understanding the planning process involved in this endeavour becomes significant for senior hospital administrators. What is not well understood is what this strategic planning process represents and how it is applied to integrate diversity management. Scant research exists about the type of strategic models that hospital CEOs employ when they wish to reposition their organizations through diversity management. This study examines the strategic planning models used by senior administrators to integrate diversity management for an institutional-wide agenda. A qualitative survey process was used for CEOs in the states of New York, Pennsylvania, New Jersey and Delaware. The key research questions dealt with what type of strategic plan approach senior administrators used for integrating diversity management and what rationale they used to pursue this. Significant differences were reported between three types of strategic plan modelling used by CEOs. Also, when comparing past and current practices over time, such differences existed. The need to integrate diversity management is underscored by this study. How senior hospital administrators apply strategic plan models and what impact these approaches have represent the major implications that this study offers.

  18. Integrated risk management

    NASA Technical Reports Server (NTRS)

    Hunsucker, J. L.

    1993-01-01

    The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try

  19. The Academic Administrator Grid. A Guide to Developing Effective Management Teams.

    ERIC Educational Resources Information Center

    Blake, Robert R.; And Others

    The use of the "management grid" method of organizational development in college and university administration is described in this adaptation of the 1964 book by the same authors, "The Management Grid." Five major administrative styles are identified: (1) caretaker, (2) comfortable and pleasant, (3) constituency-centered, (4) team, and (5)…

  20. RISK MANAGEMENT OF SEDIMENT STRESS: A FRAMEWORK FOR SEDIMENT RISK MANAGEMENT RESEARCH

    EPA Science Inventory

    Research related to the ecological risk management of sediment stress in watersheds is placed under a common conceptual framework in order to help promote the timely advance of decision support methods for aquatic resource managers and watershed-level planning. The proposed risk ...

  1. 77 FR 53802 - Procurement, Management, and Administration of Engineering and Design Related Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ...-2012-0043] RIN 2125-AF44 Procurement, Management, and Administration of Engineering and Design Related... regulations governing the procurement, management, and administration of engineering and design related... . Background The FHWA proposes to modify existing regulations for the administration of engineering and design...

  2. Supporting the risk management process with land information: a case study of Australia.

    PubMed

    Potts, Katie Elizabeth; Rajabifard, Abbas; Bennett, Rohan Mark

    2017-04-01

    It is frequently argued that, at the parcel level, stakeholders are capable of and well supported in managing their land-related risks. Yet, evidence from the contemporary Australian context suggests otherwise: numerous large-scale disaster events have revealed that citizens are ill-prepared to respond and recover adequately. This paper begins with the premise that information, specifically land information, could better support parcel-level risk preparation, mitigation, response, and recovery. State land administration organisations in Australia primarily maintain this information and make it accessible. Land information is used regularly across all levels of government to support risk management activities; however, such application has not always occurred at the parcel and citizen level. Via a case study approach, this paper initially explores the land information available in Australia to stakeholders interested in parcel-level detail, and then goes on to propose how the utilisation of parcel-level land information could serve to enhance risk management practices. © 2017 The Author(s). Disasters © Overseas Development Institute, 2017.

  3. Management advisory memorandum on National Airspace System infrastructure management system prototype, Federal Aviation Administration

    DOT National Transportation Integrated Search

    1997-03-01

    This is our Management Advisory Memorandum on the National Airspace : System (NAS) Infrastructure Management System (NIMS) prototype : project in the Federal Aviation Administration (FAA). Our review was : initiated in response to a hotline complaint...

  4. Risk management through staff education.

    PubMed

    Seisser, M A; Epstein, A L

    1998-01-01

    The staff members of a healthcare organization are recognized as students of risk management. The risk manager, through application of the fundamentals of andragogy (i.e., learning strategies specific to adult learners), is in an advantageous position to assist staff in successfully applying risk management thought processes and related actions.

  5. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burford, M.J.; Burnett, R.A.; Curtis, L.M.

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS system package. System administrators, database administrators, and general users can use this guide to install, configure, and maintain the FEMIS client software package. This document provides a description of the FEMIS environment; distribution media; data, communications, and electronic mail servers; user workstations; and system management.

  6. 48 CFR 1845.505-70 - Responsibilities of the property administrator.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... determines that all or a portion of a contractor's property management practices and processes do not afford... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property... the Government's acceptance of risk. (d) The property administrator shall review records and the...

  7. 48 CFR 1845.505-70 - Responsibilities of the property administrator.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... determines that all or a portion of a contractor's property management practices and processes do not afford... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property... the Government's acceptance of risk. (d) The property administrator shall review records and the...

  8. 48 CFR 1845.505-70 - Responsibilities of the property administrator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... determines that all or a portion of a contractor's property management practices and processes do not afford... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property... the Government's acceptance of risk. (d) The property administrator shall review records and the...

  9. Quality Control in the Administration of Sport Management Internships

    ERIC Educational Resources Information Center

    Kelley, Dennie Ruth

    2004-01-01

    The quality of an intern's learning experience is the joint responsibility of the academic internship coordinator, the administrator of the sport management program, and the agency supervisor. The purpose of this article is to identify the areas of administrative concern in the three major components of an internship: the institution granting…

  10. Risk Management in Cocurricular Activities.

    ERIC Educational Resources Information Center

    Webb, Edward M.

    1988-01-01

    Discusses risk management for colleges' cocurricular activities. Discusses tort liability, contributory negligence, and assumption of risk. Provides six concrete steps for managing risks responsibly and professionally: adopting an educational mission statement, assigning risk to others, establishing safety standards, training club advisors,…

  11. Implementation of cold risk management in occupational safety, occupational health and quality practices. Evaluation of a development process and its effects at the finnish maritime administration.

    PubMed

    Risikko, Tanja; Remes, Jouko; Hassi, Juhani

    2008-01-01

    Cold is a typical environmental risk factor in outdoor work in northern regions. It should be taken into account in a company's occupational safety, health and quality systems. A development process for improving cold risk management at the Finnish Maritime Administration (FMA) was carried out by FMA and external experts. FMA was to implement it. Three years after the development phase, the outcomes and implementation were evaluated. The study shows increased awareness about cold work and few concrete improvements. Concrete improvements in occupational safety and health practices could be seen in the pilot group. However, organization-wide implementation was insufficient, the main reasons being no organization-wide practices, unclear process ownership, no resources and a major reorganization process. The study shows a clear need for expertise supporting implementation. The study also presents a matrix for analyzing the process.

  12. Extravasation Risk Using Ultrasound-guided Peripheral Intravenous Catheters for Computed Tomography Contrast Administration.

    PubMed

    Rupp, Jordan D; Ferre, Robinson M; Boyd, Jeremy S; Dearing, Elizabeth; McNaughton, Candace D; Liu, Dandan; Jarrell, Kelli L; McWade, Conor M; Self, Wesley H

    2016-08-01

    Ultrasound-guided intravenous catheter (USGIV) insertion is increasingly being used for administration of intravenous (IV) contrast for computed tomography (CT) scans. The goal of this investigation was to evaluate the risk of contrast extravasation among patients receiving contrast through USGIV catheters. A retrospective observational study of adult patients who underwent a contrast-enhanced CT scan at a tertiary care emergency department during a recent 64-month period was conducted. The unadjusted prevalence of contrast extravasation was compared between patients with an USGIV and those with a standard peripheral IV inserted without ultrasound. Then, a two-stage sampling design was used to select a subset of the population for a multivariable logistic regression model evaluating USGIVs as a risk factor for extravasation while adjusting for potential confounders. In total, 40,143 patients underwent a contrasted CT scan, including 364 (0.9%) who had contrast administered through an USGIV. Unadjusted prevalence of extravasation was 3.6% for contrast administration through USGIVs and 0.3% for standard IVs (relative risk = 13.9, 95% confidence interval [CI] = 7.9 to 24.6). After potential confounders were adjusted for, CT contrast administered through USGIVs was associated with extravasation (adjusted odds ratio = 8.6, 95% CI = 4.6 to 16.2). No patients required surgical management for contrast extravasation; one patient in the standard IV group was admitted for observation due to extravasation. Patients who received contrast for a CT scan through an USGIV had a higher risk of extravasation than those who received contrast through a standard peripheral IV. Clinicians should consider this extravasation risk when weighing the risks and benefits of a contrast-enhanced CT scan in a patient with USGIV vascular access. © 2016 by the Society for Academic Emergency Medicine.

  13. Extravasation Risk Using Ultrasound Guided Peripheral Intravenous Catheters for Computed Tomography Contrast Administration

    PubMed Central

    Rupp, Jordan D.; Ferre, Robinson M.; Boyd, Jeremy S.; Dearing, Elizabeth; McNaughton, Candace D.; Liu, Dandan; Jarrell, Kelli L.; McWade, Conor M.; Self, Wesley H.

    2016-01-01

    Objective Ultrasound guided intravenous catheter (USGIV) insertion is increasingly being used for administration of intravenous contrast for computed tomography (CT) scans. The goal of this investigation was to evaluate the risk of contrast extravasation among patients receiving contrast through USGIV catheters. Methods A retrospective observational study of adult patients who underwent a contrast-enhanced CT scan at a tertiary-care emergency department during a recent 64-month period was conducted. The unadjusted prevalence of contrast extravasation was compared between patients with an USGIV and those with a standard peripheral IV inserted without ultrasound. Then, a two-stage sampling design was used to select a subset of the population for a multivariable logistic regression model evaluating USGIVs as a risk factor for extravasation while adjusting for potential confounders. Results In total, 40,143 patients underwent a contrasted CT scan, including 364 (0.9%) who had contrast administered through an USGIV. Unadjusted prevalence of extravasation was 3.6% for contrast administration through USGIVs and 0.3% for standard IVs (relative risk: 13.9, 95% CI: 7.7 to 24.6). After adjustment for potential confounders, CT contrast administered through USGIVs was associated with extravasation (adjusted odds ratio: 8.6; 95% CI: 4.6, 16.2). No patients required surgical management for contrast extravasation; one patient in the standard IV group was admitted for observation due to extravasation. Conclusions Patients who received contrast for a CT scan through an USGIV had a higher risk of extravasation than those who received contrast through a standard peripheral IV. Clinicians should consider this extravasation risk when weighing the risks and benefits of a contrast-enhanced CT scan in a patient with USGIV vascular access. PMID:27151898

  14. Children's Aquatics: Managing the Risk.

    ERIC Educational Resources Information Center

    Langendorfer, Stephen; And Others

    1989-01-01

    This article identifies the major risks faced by young children in aquatic programs, outlines several methods for managing risk factors, and discusses the steps involved in implementing a risk-management system. (IAH)

  15. Bibliography. College and University Business Administration.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    This regularly-updated bibliography is organized by chapter and is generally limited to publications that have specific application to colleges and universities. The chapters include: business administration in higher education; institutional planning; management information systems and data processing; risk management and insurance;…

  16. 17 CFR 200.25 - Office of Administrative and Personnel Management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management... Administrative and Personnel Management (OAPM) is responsible for providing a wide variety of programs for human... develops, implements, and evaluates the Commission's programs for human resources and personnel management...

  17. [The relevance of clinical risk management].

    PubMed

    Gulino, Matteo; Vergallo, Gianluca Montanari; Frati, Paola

    2011-01-01

    Medical activity includes a risk of possible injury or complications for the patients, that should drive the Health Care Institutions to introduce and/ or improve clinical Risk management instruments. Although Italy is still lacking a National project of Clinical Risk Management, a number of efforts have been made by different Italian Regions to introduce instruments of risk management. In addition, most of National Health Care Institutions include actually a Department specifically in charge to manage the clinical risk. Despite the practical difficulties, the results obtained until now suggest that the risk management may represent a useful instrument to contribute to the reduction of errors in clinical conduct. Indeed, the introduction of adequate instruments of prevention and management of clinical risk may help to ameliorate the quality of health care Institution services.

  18. Identifying risks in the realm of enterprise risk management.

    PubMed

    Carroll, Roberta

    2016-01-01

    An enterprise risk management (ERM) discipline is comprehensive and organization-wide. The effectiveness of ERM is governed in part by the strength and breadth of its practices and processes. An essential element in decision making is a thorough process by which organizational risks and value opportunities can be identified. This article will offer identification techniques that go beyond those used in traditional risk management programs and demonstrate how these techniques can be used to identify risks and opportunity in the ERM environment. © 2016 American Society for Healthcare Risk Management of the American Hospital Association.

  19. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 8 2012-01-01 2012-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  20. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 8 2013-01-01 2013-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  1. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  2. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  3. An Extensible Information Grid for Risk Management

    NASA Technical Reports Server (NTRS)

    Maluf, David A.; Bell, David G.

    2003-01-01

    This paper describes recent work on developing an extensible information grid for risk management at NASA - a RISK INFORMATION GRID. This grid is being developed by integrating information grid technology with risk management processes for a variety of risk related applications. To date, RISK GRID applications are being developed for three main NASA processes: risk management - a closed-loop iterative process for explicit risk management, program/project management - a proactive process that includes risk management, and mishap management - a feedback loop for learning from historical risks that escaped other processes. This is enabled through an architecture involving an extensible database, structuring information with XML, schemaless mapping of XML, and secure server-mediated communication using standard protocols.

  4. 76 FR 63509 - Small Business Size Standards: Administrative and Support, Waste Management and Remediation Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Small Business Size Standards: Administrative and Support, Waste Management and Remediation Services... Standards: Administrative and Support, Waste Management and Remediation Services AGENCY: U.S. Small Business...) Sector 56, Administrative and Support, Waste Management and Remediation Services. As part of its ongoing...

  5. Managing information technology security risk

    NASA Technical Reports Server (NTRS)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  6. The Importance of Selected Business Courses in Educating Administrative Office Managers in Kentucky.

    ERIC Educational Resources Information Center

    Brewer, Peggy

    1983-01-01

    Discusses a study to determine the importance of specific business courses included in administrative office management programs as measured by the perceptions of educators and practicing administrative office managers in Kentucky. (JOW)

  7. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  8. [Risk management for medical devices].

    PubMed

    Xie, Ying-jie; Xu, Xing-gang

    2007-07-01

    Based on the practices of the risk management activities by Chinese medical device manufacturers and theoretical study of the latest international standard ISO 14971:2007, this article analyses the risk management in medical device manufacturing industry by introducing the status quo of applications, four requirements at operational stages, and future trends of development. Methods and suggestions are therefore given to medical device manufacturers for risk management.

  9. Risk management measures for chemicals: the "COSHH essentials" approach.

    PubMed

    Garrod, A N I; Evans, P G; Davy, C W

    2007-12-01

    "COSHH essentials" was developed in Great Britain to help duty holders comply with the Control of Substances Hazardous to Health (COSHH) Regulations. It uses a similar approach to that described in the new European "REACH" Regulation (Registration, Evaluation, Authorisation and Restriction of Chemicals; EC No. 1907/2006 of the European Parliament), insofar as it identifies measures for managing the risk for specified exposure scenarios. It can therefore assist REACH duty holders with the identification and communication of appropriate risk-management measures. The technical basis for COSHH essentials is explained in the original papers published in the Annals of Occupational Hygiene. Its details will, therefore, not be described here; rather, its ability to provide a suitable means for communicating risk-management measures will be explored. COSHH essentials is a simple tool based on an empirical approach to risk assessment and risk management. The output is a "Control Guidance Sheet" that lists the "dos" and "don'ts" for control in a specific task scenario. The guidance in COSHH essentials recognises that exposure in the workplace will depend not just on mechanical controls, but also on a number of other factors, including administrative and behavioural controls, such as systems of work, supervision and training. In 2002, COSHH essentials was made freely available via the internet (http://www.coshh-essentials.org.uk/). This electronic delivery enabled links to be made between product series that share tasks, such as drum filling, and with ancillary guidance, such as setting up health surveillance for work with a respiratory sensitiser. COSHH essentials has proved to be a popular tool for communicating good control practice. It has attracted over 1 million visits to its site since its launch. It offers a common benchmark of good practice for chemical users, manufacturers, suppliers and importers, as well as regulators and health professionals.

  10. Should School Administrators Be Leaders or Managers?

    ERIC Educational Resources Information Center

    Burke, W. Warner

    Research in leadership relevant to school administrators is reviewed and summarized here. The author maintains that most previous authors identified two primary leader functions, concerns, types, or dimensions. These authors include Wortman, who, following in the footsteps of Zaleznick, saw a dichotomy between leaders and managers; Burns, who…

  11. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  12. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  13. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  14. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  15. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  16. Managing Research in a Risk World

    NASA Technical Reports Server (NTRS)

    Anton, W.; Havenhill, M.

    2014-01-01

    The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

  17. Evaluation of the School Administration Manager Project

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; Haslam, M. Bruce; Arcaira, Erikson R.; Riley, Derek L.; Sinclair, Beth; Coleman, Stephen

    2009-01-01

    The School Administration Manager (SAM) project, supported by The Wallace Foundation as part of its education initiative, focuses on changing the conditions in schools that prevent principals from devoting more time to instructional leadership. In schools participating in the National SAM Project, principals have made a commitment to increase the…

  18. Extracting additional risk managers information from a risk assessment of Listeria monocytogenes in deli meats.

    PubMed

    Pérez-Rodríguez, F; van Asselt, E D; Garcia-Gimeno, R M; Zurera, G; Zwietering, M H

    2007-05-01

    The risk assessment study of Listeria monocytogenes in ready-to-eat foods conducted by the U.S. Food and Drug Administration is an example of an extensive quantitative microbiological risk assessment that could be used by risk analysts and other scientists to obtain information and by managers and stakeholders to make decisions on food safety management. The present study was conducted to investigate how detailed sensitivity analysis can be used by assessors to extract more information on risk factors and how results can be communicated to managers and stakeholders in an understandable way. The extended sensitivity analysis revealed that the extremes at the right side of the dose distribution (at consumption, 9 to 11.5 log CFU per serving) were responsible for most of the cases of listeriosis simulated. For concentration at retail, values below the detection limit of 0.04 CFU/g and the often used limit for L. monocytogenes of 100 CFU/g (also at retail) were associated with a high number of annual cases of listeriosis (about 29 and 82%, respectively). This association can be explained by growth of L. monocytogenes at both average and extreme values of temperature and time, indicating that a wide distribution can lead to high risk levels. Another finding is the importance of the maximal population density (i.e., the maximum concentration of L. monocytogenes assumed at a certain temperature) for accurately estimating the risk of infection by opportunistic pathogens such as L. monocytogenes. According to the obtained results, mainly concentrations corresponding to the highest maximal population densities caused risk in the simulation. However, sensitivity analysis applied to the uncertainty parameters revealed that prevalence at retail was the most important source of uncertainty in the model.

  19. Administrators' Attitudes toward Cultural Diversity Management: An Empirical Study;

    ERIC Educational Resources Information Center

    Mohapatra, Manindra K.; And Others

    A study was done to test four hypotheses on the orientation of American Urban Administrators toward cultural diversity management in the public sector workplace. The study sought to test: (1) the extent of familiarity with the literature on cultural diversity; (2) relative ranking of cultural diversity management capabilities; (3) how women and…

  20. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  1. Management of the Defense Technology Security Administration Year 2000 Program

    DTIC Science & Technology

    1998-11-03

    caller is fully protected Acronyms DTSA Defense Technology Security Administration Y2K Year 2000 INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY...accordance with the DoD Management Plan Defense Technology Security Administration. The Defense Technology Security Administration ( DTSA ) was established...in 1985 as a field activity of the Office of the Secretary of Defense By establishing DTSA , the DoD role in export controls was centralized and

  2. Do expert assessments converge? An exploratory case study of evaluating and managing a blood supply risk.

    PubMed

    Eyles, John; Heddle, Nancy; Webert, Kathryn; Arnold, Emmy; McCurdy, Bronwen

    2011-08-24

    Examining professional assessments of a blood product recall/withdrawal and its implications for risk and public health, the paper introduces ideas about perceptions of minimal risk and its management. It also describes the context of publicly funded blood transfusion in Canada and the withdrawal event that is the basis of this study. Interviews with 45 experts from administration, medicine, blood supply, laboratory services and risk assessment took place using a multi-level sampling framework in the aftermath of the recall. These experts either directly dealt with the withdrawal or were involved in the management of the blood supply at the national level. Data from these interviews were coded in NVivo for analysis and interpretation. Analytically, data were interpreted to derive typifications to relate interview responses to risk management heuristics. While all those interviewed agreed on the importance of patient safety, differences in the ways in which the risk was contextualized and explicated were discerned. Risk was seen in terms of patient safety, liability or precaution. These different risk logics are illustrated by selected quotations. Expert assessments did not fully converge and it is possible that these different risk logics and discourses may affect the risk management process more generally, although not necessarily in a negative way. Patient safety is not to be compromised but management of blood risk in publicly funded systems may vary. We suggest ways of managing blood risk using formal and safety case approaches.

  3. Do expert assessments converge? An exploratory case study of evaluating and managing a blood supply risk

    PubMed Central

    2011-01-01

    Background Examining professional assessments of a blood product recall/withdrawal and its implications for risk and public health, the paper introduces ideas about perceptions of minimal risk and its management. It also describes the context of publicly funded blood transfusion in Canada and the withdrawal event that is the basis of this study. Methods Interviews with 45 experts from administration, medicine, blood supply, laboratory services and risk assessment took place using a multi-level sampling framework in the aftermath of the recall. These experts either directly dealt with the withdrawal or were involved in the management of the blood supply at the national level. Data from these interviews were coded in NVivo for analysis and interpretation. Analytically, data were interpreted to derive typifications to relate interview responses to risk management heuristics. Results While all those interviewed agreed on the importance of patient safety, differences in the ways in which the risk was contextualized and explicated were discerned. Risk was seen in terms of patient safety, liability or precaution. These different risk logics are illustrated by selected quotations. Conclusions Expert assessments did not fully converge and it is possible that these different risk logics and discourses may affect the risk management process more generally, although not necessarily in a negative way. Patient safety is not to be compromised but management of blood risk in publicly funded systems may vary. We suggest ways of managing blood risk using formal and safety case approaches. PMID:21864330

  4. Gender, Race, and Risk: Intersectional Risk Management in the Sale of Sex Online.

    PubMed

    Moorman, Jessica D; Harrison, Kristen

    2016-09-01

    Sex worker experience of risk (e.g., physical violence or rape) is shaped by race, gender, and context. For web-based sex workers, experience of risk is comparatively minimal; what is unclear is how web-based sex workers manage risk and if online advertising plays a role in risk management. Building on intersectionality theory and research exploring risk management in sex work, we content-analyzed 600 escort advertisements from Backpage.com ( http://www.backpage.com ) to explore risk management in web-based sex work. To guide our research we asked: Do advertisements contain risk management messages? Does the use of risk management messaging differ by sex worker race or gender? Which groups have the highest overall use of risk management messages? Through a multivariate analysis of covariance (MANCOVA) we found that advertisements contained risk management messages and that uses of these phrases varied by race and gender. Blacks, women, and transgender women drove the use of risk management messages. Black and White transgender women had the highest overall use of these phrases. We conclude that risk management is an intersectional practice and that the use of risk management messages is a venue-specific manifestation of broader risk management priorities found in all venues where sex is sold.

  5. Risk perception as a driver for risk management policies

    NASA Astrophysics Data System (ADS)

    Carmona, María; Mañez, María

    2016-04-01

    Risk is generally defined as the "combination of the probability of the occurrence of an event and its negative consequences" ( UNISDR, 2009). However, the perception of a risk differs among cultures regarding different features such as the context,causes, benefits or damage. Risk perception is the subjective valuation of the probability of an event happening and how concerned individuals or groups are with the consequences (Sjöberg, 2004). Our study is based on an existing framework for risk perception (Rehn and Rohrmann, 2000). We analyse the characteristics of the risk perception regarding extreme events (e.g.droughts) and how the perception of the group drives the action to manage the risk. We do this to achieve an overview of the conditions that let stakeholders join each other to improve risk management especially when governments are not reacting properly. For our research, attention is paid on risk perception of Multi-Sector Partnerships not taking into account the individual level of risk perception. We focus on those factors that make risk management effective and increase resilience. Multi-Sector Partnerships, considered as significant governance structures for risk management, might contribute to reduce vulnerability in prone areas to natural hazards and disasters. The Multi-Sector Partnerships used for our research are existing partnerships identified in the cases studies of the European project ENHANCE. We implement a survey to analyse the perception of risk in the case studies. That survey is based on the Cultural Theory (Douglas and Wildavsky, 1982)and the Protection Motivation Theory (Rogers, 1975). We analyse the results using the Qualitative-Comparative Analysis proposed by Ragin in 1987. The results show the main characteristics of a risk culture that are beneficial to manage a risk. Those characteristics are shaped by the perception of risk of the people involved in the partnership, which in turn shapes their risk management. Nevertheless, we

  6. Update on the Management of High-Risk Penetrating Keratoplasty

    PubMed Central

    Jabbehdari, Sayena; Rafii, Alireza Baradaran; Yazdanpanah, Ghasem; Hamrah, Pedram; Holland, Edward J.; Djalilian, Ali R

    2017-01-01

    Purpose of review In this article, we review the indications and latest management of high-risk penetrating keratoplasty. Recent findings Despite the immune-privilege status of the cornea, immune-mediated graft rejection still remains the leading cause of corneal graft failure. This is particularly a problem in the high-risk graft recipients, namely patients with previous graft failure due to rejection and those with inflamed and vascularized corneal beds. A number of strategies including both local and systemic immunosuppression are currently used to increase the success rate of high-risk corneal grafts. Moreover, in cases of limbal stem cell deficiency, limbal stem cells transplantation is employed. Summary Corticosteroids are still the top medication for prevention and treatment in cases of corneal graft rejection. Single and combined administration of immunosuppressive agents e.g. tacrolimus, cyclosporine and mycophenolate are promising adjunctive therapies for prolonging graft survival. In the future, cellular and molecular therapies should allow us to achieve immunologic tolerance even in high-risk grafts. PMID:28959505

  7. Update on the Management of High-Risk Penetrating Keratoplasty.

    PubMed

    Jabbehdari, Sayena; Rafii, Alireza Baradaran; Yazdanpanah, Ghasem; Hamrah, Pedram; Holland, Edward J; Djalilian, Ali R

    2017-03-01

    In this article, we review the indications and latest management of high-risk penetrating keratoplasty. Despite the immune-privilege status of the cornea, immune-mediated graft rejection still remains the leading cause of corneal graft failure. This is particularly a problem in the high-risk graft recipients, namely patients with previous graft failure due to rejection and those with inflamed and vascularized corneal beds. A number of strategies including both local and systemic immunosuppression are currently used to increase the success rate of high-risk corneal grafts. Moreover, in cases of limbal stem cell deficiency, limbal stem cells transplantation is employed. Corticosteroids are still the top medication for prevention and treatment in cases of corneal graft rejection. Single and combined administration of immunosuppressive agents e.g. tacrolimus, cyclosporine and mycophenolate are promising adjunctive therapies for prolonging graft survival. In the future, cellular and molecular therapies should allow us to achieve immunologic tolerance even in high-risk grafts.

  8. Calysto: Risk Management for Commercial Manned Spaceflight

    NASA Technical Reports Server (NTRS)

    Dillaman, Gary

    2012-01-01

    The Calysto: Risk Management for Commercial Manned Spaceflight study analyzes risk management in large enterprises and how to effectively communicate risks across organizations. The Calysto Risk Management tool developed by NASA's Kennedy Space Center's SharePoint team is used and referenced throughout the study. Calysto is a web-base tool built on Microsoft's SharePoint platform. The risk management process at NASA is examined and incorporated in the study. Using risk management standards from industry and specific organizations at the Kennedy Space Center, three methods of communicating and elevating risk are examined. Each method describes details of the effectiveness and plausibility of using the method in the Calysto Risk Management Tool. At the end of the study suggestions are made for future renditions of Calysto.

  9. Risk Management: A Leader's Responsibility.

    ERIC Educational Resources Information Center

    Rowe, Roger E.

    1997-01-01

    Discusses what facilities management leaders can do to ensure the safety of students and employees. Focuses on six specific tasks, such as detecting hazards and assessing the risks, and offers three rules underlying the application of risk management, including do not accept unnecessary risk. Provides an outline of prevention responsibilities.…

  10. 17 CFR 39.13 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 1 2014-04-01 2014-04-01 false Risk management. 39.13 Section... ORGANIZATIONS Compliance with Core Principles § 39.13 Risk management. (a) General. A derivatives clearing..., procedures, and controls, approved by its board of directors, which establish an appropriate risk management...

  11. 17 CFR 39.13 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 1 2013-04-01 2013-04-01 false Risk management. 39.13 Section... ORGANIZATIONS Compliance with Core Principles § 39.13 Risk management. (a) General. A derivatives clearing..., procedures, and controls, approved by its board of directors, which establish an appropriate risk management...

  12. 17 CFR 39.13 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false Risk management. 39.13 Section... ORGANIZATIONS Compliance with Core Principles § 39.13 Risk management. (a) General. A derivatives clearing..., procedures, and controls, approved by its board of directors, which establish an appropriate risk management...

  13. Managing loss adjustment expenses: strategies for health care risk managers.

    PubMed

    Quinley, K M

    1991-01-01

    Like most businesses, adjusting companies are not charitable organizations. They are entitled to a reasonable profit, which the risk manager should not begrudge. As a buyer of adjusting services, a risk manager with an inordinate obsession with slashing adjusting bills can destroy the goal of high-quality service. It is best for risk managers to pick and choose the areas for cutting adjusting expenses. To an extent, health care risk managers should view payment of high-quality adjusting services as an investment, with the payback being money saved by fighting fraudulent, exaggerated, and questionable claims.

  14. Improving suicide risk assessment in a managed-care environment.

    PubMed

    Brown, G S; Jones, Edward R; Betts, Ellen; Wu, Jingyang

    2003-01-01

    This article describes the quality improvement intervention of a managed behavioral healthcare company to improve the quality of suicide risk assessments by its panel of providers. At-risk cases are identified by the patient's self-reported high frequency of suicidal ideation on a standardized outcome measure. Clinicians also assess severity of suicidal ideation based on clinical interviews. The clinician's assessment is identified as probably erroneous if the patient report indicates a high frequency of suicidal ideation and the clinicians assessment of suicidal ideation is none. The article describes the methods used to encourage clinicians to utilize information from the patient self-report measure as part of the clinical assessment. Probable suicidal ideation assessment errors were subsequently reduced by 29% over a 1-year period of administration.

  15. RISK COMMUNICATION AS A RISK MANAGEMENT TOOL: A RISK COMMUNICATION WORKBOOK

    EPA Science Inventory

    Communicating information about environmental risk to the people most affected by it is one of the major challenges faced by risk managers and community decision makers. Changing human behavior is a far more complex task than designing water retention systems or managing storm wa...

  16. Business resilience: Reframing healthcare risk management.

    PubMed

    Simeone, Cynthia L

    2015-09-01

    The responsibility of risk management in healthcare is fractured, with multiple stakeholders. Most hospitals and healthcare systems do not have a fully integrated risk management system that spans the entire organizational and operational structure for the delivery of key services. This article provides insight toward utilizing a comprehensive Business Resilience program and associated methodology to understand and manage organizational risk leading to organizational effectiveness and operational efficiencies, with the fringe benefit of realizing sustainable operational capability during adverse conditions. © 2015 American Society for Healthcare Risk Management of the American Hospital Association.

  17. Fixing responsibility for risk management.

    PubMed

    Maniccia, M D

    2000-01-01

    The responsibility for carrying financial risk for medical coverage has migrated from individuals to insurers to employers to providers, without finding a satisfactory home. Each shift further complicates the health care infrastructure, as other responsibilities in the management of benefits and provision of care gravitate to the stakeholder who accepts risk. The social imperative to broaden coverage is forcing a change in the mechanisms of risk management--from avoiding high-risk patients, to managing those patients to better outcomes. In this paper we seek to identify objectively the most appropriate party to carry the financial risk of medical coverage, consider what characteristics are necessary to make that a practical and enduring solution, and examine the secondary effects of the structure required to support that solution.

  18. Managing Risk Assessment in Science Departments.

    ERIC Educational Resources Information Center

    Forlin, Peter; Forlin, Chris

    1997-01-01

    Describes a health-and-safety risk-management audit in four Queensland, Australia high schools. One major outcome of this research project is the development of a comprehensive risk-management policy in compliance with the law. Other outcomes include the preparation of a professional-development package in risk-management policy for use as a…

  19. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 8 2013-01-01 2013-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  20. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  1. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 8 2012-01-01 2012-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  2. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  3. The quality assurance-risk management interface.

    PubMed

    Little, N

    1992-08-01

    Involvement with both risk management and quality assurance programs has led many authors to the conclusion that the fundamental differences between these activities are, in fact, very small. "At the point of overlap, it is almost impossible to distinguish the purposes and methods of both functions from one another." "Good risk management includes real improvement in patient care through organized quality assurance activities." The interface between a proactive risk management program and a quality assurance program is dynamic and can serve the legitimate interests of both. There is little to be gained by thinking of them as separate entities and much to be gained by sharing the lessons of both. If one thinks of risk management in terms of "risk" to quality patient care, and that "assuring quality" is the most productive type of risk management, then there is no practical reason to separate one from the other.

  4. [Health management as part of leadership in public administration].

    PubMed

    Matyssek, A K

    2012-02-01

    Leadership includes two tasks within public administration: leading employees by creating healthy working conditions and being led by others. The basis of leading others in a healthy way means dealing with oneself in a healthy manner; this includes typical healthy behavior (i.e., physical activity, improved nutrition, not smoking), which allows for recovery by a good work-life balance and a sensitive dealing with one's own limits. Given these conditions of healthy self care, managers are able to act as role models and lead their employees in a healthy manner. Leading in a healthy manner means showing appreciation, being interested in the employees ("caring"), integrating them in decision-making, allowing transparency, improving the working atmosphere, and finally reducing stress and increasing resources. The latter includes social support, which decreases the danger of employees burning out. The article presents the concept of a 2-day training that is designed for managers in order to raise their awareness for duties related to health management in public administration.

  5. Managing risks and hazardous in industrial operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Almaula, S.C.

    1996-12-31

    The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 tomore » $200,000. 3 refs., 2 figs., 1 tab.« less

  6. 77 FR 72691 - Small Business Size Standards: Administrative and Support, Waste Management and Remediation Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...: Administrative and Support, Waste Management and Remediation Services AGENCY: U.S. Small Business Administration..., Administrative and Support, Waste Management and Remediation Services. As part of its ongoing comprehensive... size standard for Environmental Remediation Services, an ``exception'' under NAICS 562910, Remediation...

  7. [Does clinical risk management require a structured conflict management?].

    PubMed

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  8. Business Administration and Management. Occupational Competency Analysis Profile.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Vocational Instructional Materials Lab.

    This Occupational Competency Analysis Profile (OCAP) for business administration and management is an employer-verified competency list that evolved from a modified DACUM (Developing a Curriculum) job analysis process involving business, industry, labor, and community agency representatives throughout Ohio. The competency list consists of six…

  9. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  10. Overview of Risk Management for Engineered Nanomaterials

    NASA Astrophysics Data System (ADS)

    Schulte, P. A.; Geraci, C. L.; Hodson, L. L.; Zumwalde, R. D.; Kuempel, E. D.; Murashov, V.; Martinez, K. F.; Heidel, D. S.

    2013-04-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  11. The risk of bronchospasm in asthmatics undergoing general anaesthesia and/or intravascular administration of radiographic contrast media. physiopatology and clinical/functional evaluation.

    PubMed

    Liccardi, G; Salzillo, A; Piccolo, A; De Napoli, I; D'Amato, G

    2010-10-01

    It is well known that patients suffering from bronchial asthma undergoing to surgical procedures requiring general anaesthesia (GA) or the administration of water soluble radiographic contrast media (RCM) experience a risk of potentially severe bronchospasm. Nevertheless, little attention has been devoted on the possible preventive measures to reduce the occurrence of this potentially life-threatening event. It has been shown that the most important risk factor for bronchospasm during GA induction and/or the use of RCM is represented by a high degree of bronchial hyperreactivity with airway instability not adequately controlled by long-term anti-inflammatory treatment. The aim of this review is to underline the need for an accurate clinical and functional evaluation of asthmatics (especially those with a relevant degree of asthma severity) undergoing GA or administration of RCM. Guidelines shared by pulmonologists, allergologists, anesthesiologists and radiologists should be produced in the future for a better evaluation and management of these patients. General practitioner plays an important role in managing asthmatic patients in "Real Life". It is likely that "Real Life"--optimally controlled asthmatics could undergo GA/RCM with lower risks especially in emergency conditions when it is not possible to perform any preoperative evaluation.

  12. Software And Systems Engineering Risk Management

    DTIC Science & Technology

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  13. Identifying and Managing Risk.

    ERIC Educational Resources Information Center

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  14. Risk management perspective for climate service development - Results from a study on Finnish organizations

    NASA Astrophysics Data System (ADS)

    Harjanne, Atte; Haavisto, Riina; Tuomenvirta, Heikki; Gregow, Hilppa

    2017-10-01

    Weather, climate and climate change can cause significant risks to businesses and public administration. However, understanding these processes can also create opportunities. Information can help to manage these risks and opportunities, but in order to do so, it must be in line with how risk management and decision making works. To better understand how climate risks and opportunities are reflected in different organizational processes and what types of information is needed and used, we conducted a study on the perceptions and management of weather and climate risks in Finnish organizations and on their use of weather and climate information. In addition, we collected feedback on how the existing climate information tools should be developed. Data on climate risk management was collected in an online survey and in one full-day workshop. The survey was aimed to the Finnish public and private organizations who use weather and climate data and altogether 118 responses were collected. The workshop consisted of two parts: weather and climate risk management processes in general and the development of the current information tools to further address user needs.

    We found that climate risk management in organizations is quite diverse and often de-centralized and that external experts are considered the most useful sources of information. Consequently, users emphasize the need for networks of expertise and sector-specific information tools. Creating such services requires input and information sharing from the user side as well. Better temporal and spatial accuracy is naturally asked for, but users also stressed the need for transparency when it comes to communicating uncertainties, and the availability and up-to-datedness of information. Our results illustrate that weather and climate risks compete and blend in with other risks and changes perceived by the organizations and supporting information is sought from different types of sources. Thus the design and

  15. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burford, M.J.; Burnett, R.A.; Downing, T.R.

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage.more » The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.« less

  16. Therapeutic risk management of the suicidal patient: augmenting clinical suicide risk assessment with structured instruments.

    PubMed

    Homaifar, Beeta; Matarazzo, Bridget; Wortzel, Hal S

    2013-09-01

    This column is the second in a series presenting a model for therapeutic risk management of the suicidal patient. As discussed in the first part of the series, the model involves several elements including augmenting clinical risk assessment with structured instruments, stratifying risk in terms of both severity and temporality, and developing and documenting a safety plan. This column explores in more detail how to augment clinical risk assessment with structured instruments. Unstructured clinical interviews have the potential to miss important aspects of suicide risk assessment. By augmenting the free-form clinical interview with structured instruments that demonstrate reliability and validity, a more nuanced and multifaceted approach to suicide risk assessment is achieved. Incorporating structured instruments into practice also serves a medicolegal function, since these instruments may become a living part of the medical record, establishing baseline levels of suicidal thoughts and behaviors and facilitating future clinical determinations regarding safety needs. We describe several instruments used in a multidisciplinary suicide consultation service, each of which has demonstrated relevance to suicide risk assessment and screening, ease of administration, and strong psychometric properties. In addition, we emphasize the importance of viewing suicide risk assessment as an ongoing process rather than as a singular event. Finally, we discuss special considerations in the evolving practice of risk assessment.

  17. The NASA Risk Management Program

    NASA Technical Reports Server (NTRS)

    Buchbinder, Benjamin

    1990-01-01

    This paper describes the NASA Risk Management Program established by the Headquarters Office of Safety and Mission Quality (MSQ). Current agency policy is outlined, risk management assistance to the field is described, and examples are given of independent risk assessments conducted by SMQ. The motivation for and the structure of the program is placed in the historical context of pre- and post-Challenger environments.

  18. Cognitive mapping tools: review and risk management needs.

    PubMed

    Wood, Matthew D; Bostrom, Ann; Bridges, Todd; Linkov, Igor

    2012-08-01

    Risk managers are increasingly interested in incorporating stakeholder beliefs and other human factors into the planning process. Effective risk assessment and management requires understanding perceptions and beliefs of involved stakeholders, and how these beliefs give rise to actions that influence risk management decisions. Formal analyses of risk manager and stakeholder cognitions represent an important first step. Techniques for diagramming stakeholder mental models provide one tool for risk managers to better understand stakeholder beliefs and perceptions concerning risk, and to leverage this new understanding in developing risk management strategies. This article reviews three methodologies for assessing and diagramming stakeholder mental models--decision-analysis-based mental modeling, concept mapping, and semantic web analysis--and assesses them with regard to their ability to address risk manager needs. © 2012 Society for Risk Analysis.

  19. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    ERIC Educational Resources Information Center

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  20. TeamSTEPPS for health care risk managers: Improving teamwork and communication.

    PubMed

    Cooke, Marcia

    2016-07-01

    Ineffective communication among the health care team is a leading cause of errors in the patient care setting. Studies assessing training related to communication and teamwork in the clinical team are prevalent, however, teamwork training at the administrative level is lacking. This includes individuals in leadership positions such as health care risk managers. The purpose was to determine the impact of an educational intervention on the knowledge and attitudes related to communication and teamwork in the health care risk management population. The educational intervention was an adaptation of a national teamwork training program and incorporated didactic content as well as video vignettes and small group activities. Measurement of knowledge and attitudes were used to determine the impact of the education program. Knowledge and attitudes were assessed pre- and postcourse. Findings indicate that teamwork education tailored to the needs of the specific audience resulted in knowledge gained and improved attitudes toward the components of teamwork. The attitudes that most significantly improved were related to team structure and situation monitoring. There was no improvement in participants' attitudes toward leadership, mutual support, and communication. Team training has been shown to improve safety culture, patient satisfaction, and clinical outcomes. Including risk managers in training on teamwork, communication, and collaboration can serve to foster a common language among clinicians and management. In addition, a measurement related to implementation in the health care setting may yield insight into the impact of training. Qualitative measurement may allow the researcher to delve deeper into how these health care facilities are using team training interventions. © 2016 American Society for Healthcare Risk Management of the American Hospital Association.

  1. 14 CFR 1212.702 - Associate Administrator for Management Systems and Facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Associate Administrator for Management Systems and Facilities. 1212.702 Section 1212.702 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.702 Associate...

  2. 14 CFR 1212.702 - Associate Administrator for Management Systems and Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Associate Administrator for Management Systems and Facilities. 1212.702 Section 1212.702 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.702 Associate...

  3. Opportunities for administrators to promote disease management.

    PubMed

    Kash, Bita A; Gamm, Larry D; Bolin, Jane Nelson; Peck, B Mitchell

    2005-01-01

    Studies of disease management (DM) have shown that patients who participate in such programs achieve better health status and make fewer emergency room visits. Private and government payers have recently increased their efforts to promote DM initiatives through financial incentives to healthcare providers. This article explores opportunities for administrators of health services organizations (HSO) to promote DM in the current political and economic environment. Our survey of professionals (DM leaders, physicians, and DM nurses) in six DM programs reveals these professionals' assessments of the key players and resources that they deem important to their respective DM programs. They view DM programs as heavily dependent on the support of physicians, nurses, and health plan leaders but relatively less so on the support of HSO administrators- a situation that may suggest opportunities for administrators to take on greater leadership in moving the HSO toward developing DM programs. Survey results also indicate a strong need for the integration of resources such as communication systems, electronic medical records, and DM reporting. Taken collectively, these needs suggest a number of strategies for the administrator to play a larger role in supporting the adoption and effective implementation of DM. In the article, we propose that DM programs can benefit substantially from an administrator who can demonstrate a thorough knowledge of DM-related government and private-payer initiatives and who has the ability to provide leadership to develop and implement viable DM programs. Valued contributions that the administrator should bring to the table include support of standardized DM processes, use of practice guidelines, and provision of pertinent information systems.

  4. 12 CFR 704.6 - Credit risk management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Credit risk management. 704.6 Section 704.6... CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate according to a credit risk management policy that is commensurate with the investment risks and activities...

  5. Management Advisory on Deployment Readiness Review - Federal Aviation Administration

    DOT National Transportation Integrated Search

    1997-12-08

    This management advisory discusses the best practices identified during our review of the Federal Aviation Administration's (FAA) Deployment Readiness Review (DRR) process which should be adopted and strengthened as part of FAA's new Acquisition Mana...

  6. Using Computational Approaches to Improve Risk-Stratified Patient Management: Rationale and Methods

    PubMed Central

    Stone, Bryan L; Sakaguchi, Farrant; Sheng, Xiaoming; Murtaugh, Maureen A

    2015-01-01

    most appropriate care. Methods This study will (1) combine patient, physician profile, and environmental variable features to improve prediction accuracy of individual patient health outcomes and costs; (2) develop the first algorithm to explain prediction results and suggest tailored interventions; (3) develop the first algorithm to compute optimal thresholds for risk strata; and (4) conduct simulations to estimate outcomes of risk-stratified patient management for various configurations. The proposed techniques will be demonstrated on a test case of asthma patients. Results We are currently in the process of extracting clinical and administrative data from an integrated health care system’s enterprise data warehouse. We plan to complete this study in approximately 5 years. Conclusions Methods developed in this study will help transform risk-stratified patient management for better clinical outcomes, higher patient satisfaction and quality of life, reduced health care use, and lower costs. PMID:26503357

  7. Risk Management in Biologics Technology Transfer.

    PubMed

    Toso, Robert; Tsang, Jonathan; Xie, Jasmina; Hohwald, Stephen; Bain, David; Willison-Parry, Derek

    Technology transfer of biological products is a complex process that is important for product commercialization. To achieve a successful technology transfer, the risks that arise from changes throughout the project must be managed. Iterative risk analysis and mitigation tools can be used to both evaluate and reduce risk. The technology transfer stage gate model is used as an example tool to help manage risks derived from both designed process change and unplanned changes that arise due to unforeseen circumstances. The strategy of risk assessment for a change can be tailored to the type of change. In addition, a cross-functional team and centralized documentation helps maximize risk management efficiency to achieve a successful technology transfer. © PDA, Inc. 2016.

  8. Improving Education and Training for Educational Administrators and Managers: Urgent Needs.

    ERIC Educational Resources Information Center

    Hughes, M. G.

    This paper advocates giving urgent attention to improving the education and training of educational administrators and managers, realizing the need to respond to rapid and far-reaching political and social change worldwide, and to consequent change within national educational systems. The improvement of administrative structures and the…

  9. The Implications of Industrial Management for the Administration of Industrial Education Programs

    ERIC Educational Resources Information Center

    White, Michael R.

    1978-01-01

    The paper discusses the functions and principles of industrial management, compares educational and industrial organization, and notes industrial management techniques applicable to industrial education administration. (MF)

  10. Continuous Risk Management: A NASA Program Initiative

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  11. Managing total corporate electricity/energy market risks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henney, A.; Keers, G.

    1998-10-01

    The banking industry has developed a tool kit of very useful value at risk techniques for hedging risk, but these techniques must be adapted to the special complexities of the electricity market. This paper starts with a short history of the use of value-at-risk (VAR) techniques in banking risk management and then examines the specific and, in many instances, complex risk management challenges faced by electric companies from the behavior of prices in electricity markets and from the character of generation and electric retailing risks. The third section describes the main methods for making VAR calculations along with an analysismore » of their suitability for analyzing the risks of electricity portfolios and the case for using profit at risk and downside risk as measures of risk. The final section draws the threads together and explains how to look at managing total corporate electricity market risk, which is a big step toward managing total corporate energy market risk.« less

  12. Risk Management Concepts and Guidance

    DTIC Science & Technology

    1989-03-01

    SUMMARY . ,den.ifying risks 5.3 PROGRAMMATIC RISK SUMMARY o Quantifying risk 5.4 SUPPORTABILITY RISK SUMMARY 55 SCHEDULE RISK SUMMARY * Use of tools to...with Life Cycle Cost Estimates," Defense Systems Management School, (Fort Belvoir). 1973. 207. Lieber, R.S., "New Approaches for Quantifying Risk and

  13. Challenges and opportunities in healthcare volunteer management: insights from volunteer administrators.

    PubMed

    Rogers, Sean E; Rogers, Carmen M; Boyd, Karen D

    2013-01-01

    Volunteer administrators from 105 hospitals in five states in the northeast and southern United States provided open-ended survey responses about what they perceived to be the most pressing challenges and opportunities facing healthcare volunteer management. Taken together, these 105 hospitals used a total of 39,008 volunteers and 5.3 million volunteer hours during a 12-month period between 2010 and 2011. A qualitative content analysis of administrator responses suggests that primary challenges include volunteer recruitment and retention, administrative issues, and operational difficulties brought about by the current economic crisis. Key opportunities include more explicitly linking the volunteer function to hospital outcomes and community impact, expanding volunteer recruitment pools and roles and jobs, and developing organizational support for volunteers and making the volunteer management function more efficient and effective.

  14. Sports Management and Administration Internships and Students with Disabilities: Responsibilities and Practices for Success

    ERIC Educational Resources Information Center

    Barnes, John

    2009-01-01

    Practica, internships, and mentorships are vital for the development of capable and productive graduates of preprofessional academic programs, including sports management and sports administration programs. College students with disabilities, including those in sports management and sports administration programs, who are preparing to enter their…

  15. Managing multihazards risk in metropolitan USA

    NASA Astrophysics Data System (ADS)

    Aktan, A. Emin; Comfort, Louise K.; Shanis, Donald S.

    2003-07-01

    This proposal outlines an action plan for risk management in the Delaware Valley Metropolitan Region. This plan is consistent with the goals for strengthening homeland security announced by President Bush, and is designed to complement efforts currently under development by Pennsylvania Emergency Management Agency and Department of Health. This plan proposes the formation of a Delaware Valley Risk Management Consortium, representing the critical disciplines and organizations related to risk assessment and management. This group would have membership from academic institutions, government agencies, industry, and nonprofit organizations. This Consortium would develop a systemic scope of work with the appropriate recommendations for technology acquisition, development and integration with risk management policies and procedures. This scope of work would include the development of two related information systems for the Delaware Valley Region. The first would be a comprehensive 'health monitoring' system to assess the continuity of operations, which would use integrated remote sensing and imaging, information gathering, communication, computation, and, information processing and management over wide-area networks covering the entire metropolitan area. The second would use real-time information from the health monitoring system to support interactive communication, search and information exchange needed to coordinate action among the relevant agencies to mitigate risk, respond to hazards and manage its resources efficiently and effectively.

  16. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approach to managing these risks. [65 FR 70316, Nov. 22, 2000] ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Risk management. 1815.203... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  17. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering... monitored, funding availability, and program management risk. (c) Appropriate techniques should be applied...

  18. 48 CFR 2901.603-72 - Administrative procurement management reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior..., policies, procedures and applicable directives. The reviews are to emphasize the development and... quality reviews and assessment techniques. This system is required to: (1) Evaluate the effectiveness and...

  19. Managing Your Administrator.

    ERIC Educational Resources Information Center

    Von Bergen, C. W.; Soper, Barlow; Licata, Jane W.

    2002-01-01

    Explains why effective teachers need relationships of mutual respect and understanding with their supervisors. Makes suggestions for building relationships: understand administrators' objectives, pressures, strengths, weaknesses, and preferred styles; communicate needs clearly; and keep administrators informed. Describes incompetent types of…

  20. Does being drunk or high cause HIV sexual risk behavior? A systematic review of drug administration studies.

    PubMed

    Berry, Meredith S; Johnson, Matthew W

    2018-01-01

    HIV sexual risk behavior is broadly associated with substance use. Yet critical questions remain regarding the potential causal link between substance use (e.g., intoxication) and HIV sexual risk behavior. The present systematic review was designed to examine and synthesize the existing literature regarding the effects of substance administration on HIV sexual risk behavior. Randomized controlled experiments investigating substance administration and HIV sexual risk behavior (e.g., likelihood of condom use in a casual sex scenario) were included. Across five databases, 2750 titles/abstracts were examined and forty-three total peer reviewed published manuscripts qualified (few were multi-study manuscripts, and those details are outlined in the text). The majority of articles investigated the causal role of acute alcohol administration on HIV sexual risk behavior, although one article investigated the effects of acute THC administration, one the effects of acute cocaine administration, and two the effects of buspirone. The results of this review suggest a causal role in acute alcohol intoxication increasing HIV sexual risk decision-making. Although evidence is limited with other substances, cocaine administration also appears to increase sexual risk, while acute cannabis and buspirone maintenance may decrease sexual risk. In the case of alcohol intoxication, the pharmacological effects independently contribute to HIV sexual risk decision-making, and these effects are exacerbated by alcohol expectancies, increased arousal, and delay to condom availability. Comparisons across studies showed that cocaine led to greater self-reported sexual arousal than alcohol, potentially suggesting a different risk profile. HIV prevention measures should take these substance administration effects into account. Increasing the amount of freely and easily accessible condoms to the public may attenuate the influence of acute intoxication on HIV sexual risk decision-making. Copyright

  1. Rethinking 'risk' and self-management for chronic illness.

    PubMed

    Morden, Andrew; Jinks, Clare; Ong, Bie Nio

    2012-02-01

    Self-management for chronic illness is a current high profile UK healthcare policy. Policy and clinical recommendations relating to chronic illnesses are framed within a language of lifestyle risk management. This article argues the enactment of risk within current UK self-management policy is intimately related to neo-liberal ideology and is geared towards population governance. The approach that dominates policy perspectives to 'risk' management is critiqued for positioning people as rational subjects who calculate risk probabilities and act upon them. Furthermore this perspective fails to understand the lay person's construction and enactment of risk, their agenda and contextual needs when living with chronic illness. Of everyday relevance to lay people is the management of risk and uncertainty relating to social roles and obligations, the emotions involved when encountering the risk and uncertainty in chronic illness, and the challenges posed by social structural factors and social environments that have to be managed. Thus, clinical enactments of self-management policy would benefit from taking a more holistic view to patient need and seek to avoid solely communicating lifestyle risk factors to be self-managed.

  2. Comparison of scientific and administrative database management systems

    NASA Technical Reports Server (NTRS)

    Stoltzfus, J. C.

    1983-01-01

    Some characteristics found to be different for scientific and administrative data bases are identified and some of the corresponding generic requirements for data base management systems (DBMS) are discussed. The requirements discussed are especially stringent for either the scientific or administrative data bases. For some, no commercial DBMS is fully satisfactory, and the data base designer must invent a suitable approach. For others, commercial systems are available with elegant solutions, and a wrong choice would mean an expensive work-around to provide the missing features. It is concluded that selection of a DBMS must be based on the requirements for the information system. There is no unique distinction between scientific and administrative data bases or DBMS. The distinction comes from the logical structure of the data, and understanding the data and their relationships is the key to defining the requirements and selecting an appropriate DBMS for a given set of applications.

  3. Spatio-temporal population estimates for risk management

    NASA Astrophysics Data System (ADS)

    Cockings, Samantha; Martin, David; Smith, Alan; Martin, Rebecca

    2013-04-01

    Accurate estimation of population at risk from hazards and effective emergency management of events require not just appropriate spatio-temporal modelling of hazards but also of population. While much recent effort has been focused on improving the modelling and predictions of hazards (both natural and anthropogenic), there has been little parallel advance in the measurement or modelling of population statistics. Different hazard types occur over diverse temporal cycles, are of varying duration and differ significantly in their spatial extent. Even events of the same hazard type, such as flood events, vary markedly in their spatial and temporal characteristics. Conceptually and pragmatically then, population estimates should also be available for similarly varying spatio-temporal scales. Routine population statistics derived from traditional censuses or surveys are usually static representations in both space and time, recording people at their place of usual residence on census/survey night and presenting data for administratively defined areas. Such representations effectively fix the scale of population estimates in both space and time, which is unhelpful for meaningful risk management. Over recent years, the Pop24/7 programme of research, based at the University of Southampton (UK), has developed a framework for spatio-temporal modelling of population, based on gridded population surfaces. Based on a data model which is fully flexible in terms of space and time, the framework allows population estimates to be produced for any time slice relevant to the data contained in the model. It is based around a set of origin and destination centroids, which have capacities, spatial extents and catchment areas, all of which can vary temporally, such as by time of day, day of week, season. A background layer, containing information on features such as transport networks and landuse, provides information on the likelihood of people being in certain places at specific times

  4. Role of medical, technical, and administrative leadership in the human resource management life cycle: a team approach to laboratory management.

    PubMed

    Wilkinson, D S; Dilts, T J

    1999-01-01

    We believe the team approach to laboratory management achieves the best outcomes. Laboratory management requires the integration of medical, technical, and administrative expertise to achieve optimal service, quality, and cost performance. Usually, a management team of two or more individuals must be assembled to achieve all of these critical leadership functions. The individual members of the management team must possess the requisite expertise in clinical medicine, laboratory science, technology management, and administration. They also must work together in a unified and collaborative manner, regardless of where individual team members appear on the organizational chart. The management team members share in executing the entire human resource management life cycle, creating the proper environment to maximize human performance. Above all, the management team provides visionary and credible leadership.

  5. Marine and Hydrokinetic Technology Development Risk Management Framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snowberg, David; Weber, Jochem

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over themore » development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.« less

  6. Assessing and Managing Multiple Risks in a Changing World ...

    EPA Pesticide Factsheets

    Roskilde University hosted a November 2015 workshop on “Environmental Risk – Assessing and Managing Multiple Risks in a Changing World”. Thirty attendees from 9 countries developed consensus recommendations regarding: implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process involving both universal and site-, region-, or problem-specific protection goals; addressing societal issues; risk management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. We encourage both cross- and inter-disciplinary approaches to address 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and non-chemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk assessment process; 4) fully integrate risk assessors and communities of interest into the risk management process; 5) consider socio-economics and increase transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference con

  7. Risk management, derivatives and shariah compliance

    NASA Astrophysics Data System (ADS)

    Bacha, Obiyathulla Ismath

    2013-04-01

    Despite the impressive growth of Islamic Banking and Finance (IBF), a number of weaknesses remain. The most important of this is perhaps the lack of shariah compliant risk management tools. While the risk sharing philosophy of Islamic Finance requires the acceptance of risk to justify returns, the shariah also requires adherents to avoid unnecessary risk-maysir. The requirement to avoid maysir is in essence a call for the prudent management of risk. Contemporary risk management revolves around financial engineering, the building blocks of which are financial derivatives. Despite the proven efficacy of derivatives in the management of risk in the conventional space, shariah scholars appear to be suspicious and uneasy with their use in IBF. Some have imposed outright prohibition of their use. This paper re-examines the issue of contemporary derivative instruments and shariah compliance. The shariah compatibility of derivatives is shown in a number of ways. First, by way of qualitative evaluation of whether derivatives can be made to comply with the key prohibitions of the sharia. Second, by way of comparing the payoff profiles of derivatives with risk sharing finance and Bai Salam contracts. Finally, the equivalence between shariah compliant derivatives like the IPRS and Islamic FX Currency Forwards with conventional ones is presented.

  8. Consumer responses to communication about food risk management.

    PubMed

    van Dijk, Heleen; Houghton, Julie; van Kleef, Ellen; van der Lans, Ivo; Rowe, Gene; Frewer, Lynn

    2008-01-01

    Recent emphasis within policy circles has been on transparent communication with consumers about food risk management decisions and practices. As a consequence, it is important to develop best practice regarding communication with the public about how food risks are managed. In the current study, the provision of information about regulatory enforcement, proactive risk management, scientific uncertainty and risk variability were manipulated in an experiment designed to examine their impact on consumer perceptions of food risk management quality. In order to compare consumer reactions across different cases, three food hazards were selected (mycotoxins on organically grown food, pesticide residues, and a genetically modified potato). Data were collected from representative samples of consumers in Germany, Greece, Norway and the UK. Scores on the "perceived food risk management quality" scale were subjected to a repeated-measures mixed linear model. Analysis points to a number of important findings, including the existence of cultural variation regarding the impact of risk communication strategies-something which has obvious implications for pan-European risk communication approaches. For example, while communication of uncertainty had a positive impact in Germany, it had a negative impact in the UK and Norway. Results also indicate that food risk managers should inform the public about enforcement of safety laws when communicating scientific uncertainty associated with risks. This has implications for the coordination of risk communication strategies between risk assessment and risk management organizations.

  9. Impact of managed care on healthcare delivery practices: the perception of healthcare administrators and clinical practitioners.

    PubMed

    Tietze, Mari F

    2003-01-01

    Managed care has introduced changes, such as cost effectiveness, access to care, and quality of care, to many components of the U.S. healthcare delivery system. These changes have affected how healthcare administrators and clinical practitioners perceive the impact of managed care on healthcare delivery practices. A survey was initiated to explore whether the perceptions of administrators differed from those of practitioners and to discover which organizational variables could explain the difference. A descriptive, cross-sectional survey design was used for the target population of administrators and practitioners in high, moderate, and low managed-care-penetration markets. Two investigator-developed instruments--the Managed Care Perceptions Inventory (MCPI) and the MCPI-Demographic--and an intact centralization of decision-making assessment subscale were used for data collection. Administrators had a statistically significant, more positive perception of the impact of managed care on healthcare delivery than did practitioners. When the distinction between administrator and practitioner was not used as a grouping factor, managed care market penetration, nonprofit status, and years in current employment position were factors that had statistically significant associations with a more positive perception of managed care. Based on these findings, both administrators and practitioners have a role in maintaining awareness regarding their perceptions and should work collaboratively to address issues of concern. Similarly, promoting trust and commitment at the organizational level is important. Recommendations for further research are also provided.

  10. Assessing and managing multiple risks in a changing world ...

    EPA Pesticide Factsheets

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk—Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological c

  11. [Risk management project: reactive or proactive approach?].

    PubMed

    Vastola, Pasquale; Saracino, Donato M T

    2006-01-01

    Risk management in healthcare refers to the process of developing strategies aimed at preventing and controlling the risk of occurrence of errors and harmful events. The final objective is primarily that of increasing patient safety and secondarily, that of reducing the financial burden of adverse events. The implementation of a risk management system is therefore of vital strategic importance. Nevertheless, a fundamental question that needs to be answered in the operational phase is: should a proactive or reactive approach to risk management be taken? In our view, proactive risk management has many advantages over a reactive approach and is therefore preferable. The reactive approach should be taken exclusively to obtain information regarding risk and errors, in the preliminary, as well as monitoring and follow-up phases of the project.

  12. The NASA Continuous Risk Management Process

    NASA Technical Reports Server (NTRS)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  13. The Research on Safety Management Information System of Railway Passenger Based on Risk Management Theory

    NASA Astrophysics Data System (ADS)

    Zhu, Wenmin; Jia, Yuanhua

    2018-01-01

    Based on the risk management theory and the PDCA cycle model, requirements of the railway passenger transport safety production is analyzed, and the establishment of the security risk assessment team is proposed to manage risk by FTA with Delphi from both qualitative and quantitative aspects. The safety production committee is also established to accomplish performance appraisal, which is for further ensuring the correctness of risk management results, optimizing the safety management business processes and improving risk management capabilities. The basic framework and risk information database of risk management information system of railway passenger transport safety are designed by Ajax, Web Services and SQL technologies. The system realizes functions about risk management, performance appraisal and data management, and provides an efficient and convenient information management platform for railway passenger safety manager.

  14. 76 FR 10874 - Notice of Public Meeting of the Committee on Administration and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Notice of Public Meeting of the Committee on Administration and Management AGENCY: Administrative... Administrative Conference of the United States will host a public meeting of the Committee on Administration and... documents other than rules #0;or proposed rules that are applicable to the public. Notices of hearings #0...

  15. Methods and Management: NIH Administrators, Federal Oversight, and the Framingham Heart Study

    PubMed Central

    Patel, Sejal S.

    2012-01-01

    Summary This article explores the 1965 controversy over the Framingham Heart Study in the midst of growing oversight into the management of science at the National Institutes of Health (NIH). It describes how, beginning in the early 1960s, federal overseers demanded that NIH administrators adopt particular management styles in administering programs and how these growing pressures led administrators to favor investigative pursuits that allowed for easy prospective accounting of program payoffs, especially those based on experimental methods designed to examine discrete interventions or outcomes of interest. In light of this changing managerial culture within the NIH, the Framingham study and other population laboratories—with their bases in observation and in open-ended study designs—became harder for NIH administrators to justify and defend. PMID:22643985

  16. Methods and management: NIH administrators, federal oversight, and the Framingham Heart Study.

    PubMed

    Patel, Sejal S

    2012-01-01

    This article explores the 1965 controversy over the Framingham Heart Study in the midst of growing oversight into the management of science at the National Institutes of Health (NIH). It describes how, beginning in the early 1960s, federal overseers demanded that NIH administrators adopt particular management styles in administering programs and how these growing pressures led administrators to favor investigative pursuits that allowed for easy prospective accounting of program payoffs, especially those based on experimental methods designed to examine discrete interventions or outcomes of interest. In light of this changing managerial culture within the NIH, the Framingham study and other population laboratories-with their bases in observation and in open-ended study designs-became harder for NIH administrators to justify and defend.

  17. 75 FR 17913 - Maintenance and Vegetation Management Along Existing Western Area Power Administration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line... Corporation's mandatory vegetation management and maintenance standards (FAC-003-1) in accordance with section... Service) authorizations or issuing new authorizations to accommodate Western's vegetation management...

  18. Risk management in waste water treatment.

    PubMed

    Wagner, M; Strube, I

    2005-01-01

    With the continuous restructuring of the water market due to liberalisation, privatisation and internationalisation processes, the requirements on waste water disposal companies have grown. Increasing competition requires a target-oriented and clearly structured procedure. At the same time it is necessary to meet the environment-relevant legal requirements and to design the processes to be environment-oriented. The implementation of risk management and the integration of such a management instrument in an existing system in addition to the use of modern technologies and procedures can help to make the operation of the waste water treatment safer and consequently strengthen market position. The risk management process consists of three phases, risk identification, risk analysis/risk assessment and risk handling, which are based on each other, as well as of the risk managing. To achieve an identification of the risks as complete as possible, a subdivision of the kind of risks (e.g. legal, financial, market, operational) is suggested. One possibility to assess risks is the portfolio method which offers clear representation. It allows a division of the risks into classes showing which areas need handling. The determination of the appropriate measures to handle a risk (e.g. avoidance, reduction, shift) is included in the concluding third phase. Different strategies can be applied here. On the one hand, the cause-oriented strategy, aiming at preventive measures which aim to reduce the probability of occurrence of a risk (e.g. creation of redundancy, systems with low susceptibility to malfunction). On the other hand, the effect-oriented strategy, aiming to minimise the level of damage in case of an undesired occurrence (e.g. use of alarm systems, insurance cover).

  19. 41 CFR 102-193.15 - What are the records management responsibilities of the Administrator of General Services (the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the records management responsibilities of the Administrator of General Services (the Administrator), the Archivist of...

  20. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  1. Current Chemical Risk Management Activities

    EPA Pesticide Factsheets

    EPA's existing chemicals programs address pollution prevention, risk assessment, hazard and exposure assessment and/or characterization, and risk management for chemicals substances in commercial use.

  2. The connection between long-term and short-term risk management strategies for flood and landslide hazards: examples from land-use planning and emergency management in four European case studies

    NASA Astrophysics Data System (ADS)

    Prenger-Berninghoff, K.; Cortes, V. J.; Sprague, T.; Aye, Z. C.; Greiving, S.; Głowacki, W.; Sterlacchini, S.

    2014-12-01

    Adaptation to complex and unforeseen events requires enhancing the links between planning and preparedness phases to reduce future risks in the most efficient way. In this context, the legal-administrative and cultural context has to be taken into account. This is why four case study areas of the CHANGES1 project (Nehoiu Valley in Romania, Ubaye Valley in France, Val Canale in Italy, and Wieprzówka catchment in Poland) serve as examples to highlight currently implemented risk management strategies for land-use planning and emergency preparedness. The focus is particularly on flood and landslide hazards. The strategies described in this paper were identified by means of exploratory and informal interviews in each study site. Results reveal that a dearth or, in very few cases, a weak link exists between spatial planners and emergency managers. Management strategies could benefit from formally intensifying coordination and cooperation between emergency services and spatial planning authorities. Moreover, limited financial funds urge for a more efficient use of resources and better coordination towards long-term activities. The research indicates potential benefits to establishing or, in some cases, strengthening this link through contextual changes, e.g., in organizational or administrative structures, that facilitate proper interaction between risk management and spatial planning. It also provides suggestions for further development in the form of information and decision support systems as a key connection point. 1 Marie Curie ITN CHANGES - Changing Hydro-meteorological Risks as Analyzed by a New Generation of European Scientists

  3. Metal bioavailability in ecological risk assessment of freshwater ecosystems: From science to environmental management.

    PubMed

    Väänänen, Kristiina; Leppänen, Matti T; Chen, XuePing; Akkanen, Jarkko

    2018-01-01

    Metal contamination in freshwater ecosystems is a global issue and metal discharges to aquatic environments are monitored in order to protect aquatic life and human health. Bioavailability is an important factor determining metal toxicity. In aquatic systems, metal bioavailability depends on local water and sediment characteristics, and therefore, the risks are site-specific. Environmental quality standards (EQS) are used to manage the risks of metals in aquatic environments. In the simplest form of EQSs, total concentrations of metals in water or sediment are compared against pre-set acceptable threshold levels. Now, however, the environmental administration bodies have stated the need to incorporate metal bioavailability assessment tools into environmental regulation. Scientific advances have been made in metal bioavailability assessment, including passive samplers and computational models, such as biotic ligand models (BLM). However, the cutting-edge methods tend to be too elaborate or laborious for standard environmental monitoring. We review the commonly used metal bioavailability assessment methods and introduce the latest scientific advances that might be applied to environmental management in the future. We present the current practices in environmental management in North America, Europe and China, highlighting the good practices and the needs for improvement. Environmental management has met these new challenges with varying degrees of success: the USA has implemented site-specific environmental risk assessment for water and sediment phases, and they have already implemented metal mixture toxicity evaluation. The European Union is promoting the use of bioavailability and BLMs in ecological risk assessment (ERA), but metal mixture toxicity and sediment phase are still mostly neglected. China has regulation only for total concentrations of metals in surface water. We conclude that there is a need for (1) Advanced and up-to-date guidelines and legislation

  4. Financial and risk considerations for successful disease management programs.

    PubMed

    Baldwin, A L

    1999-11-01

    Results for disease management [DM] programs have not been as positive as hoped because of clinical issues, lack of access to capital, and administrative issues. The financial experience of DM programs can be quite volatile. Financial projections that are protocol-based, rather than experience-based, may understate the revenue required and the range of possible costs for a DM program by understating the impact of complicating conditions and comorbidities. Actuarial tools (risk analysis and risk projection models) support better understanding of DM contracts. In particular, these models can provide the ability to quantify the impact of the factors that drive costs of a contract and the volatility of those costs. This analysis can assist DM companies in setting appropriate revenue and capital targets. Similar analysis by health plans can identify diseases that are good candidates for DM programs and can provide the basis for performance targets.

  5. Operational, quality, and risk management in the transfusion service: lessons learned.

    PubMed

    Goodnough, Lawrence Tim

    2012-07-01

    For general health care, the difference between quality and safety has been unclear for measurable patient outcomes. In contrast, in the transfusion service (TS), the relationship between quality and safety has been direct and demonstrable. Case studies are summarized to illustrate the relationship between operations, quality management, and risk management in the TS. In blood availability for elective surgery over 3 audited intervals, the incidence of patients undergoing elective surgery without available crossmatched blood that had been requested was 1:333, 1:328, and 1:225 for pre-quality improvement, post-quality improvement, and subsequent postintervention audit assessment, respectively. In event discovery reports (EDRs) over 2 years, incidence of biologic product deviation reports (Food and Drug Administration reportable) was successfully reduced from 60 biologic product deviation reports (12%) of 507 EDRs in 2009 to 42 (12%) of 336 EDRs in 2010. In wrong blood in tube, 102 specimens were identified (by a change in patient's ABO/Rh) from 176,711 type and screen/cross-match specimens received over a 5-year interval, detected either by previous patient record of ABO/Rh or by a second specimen for blood type confirmation implemented in our TS for the last 3 years. No known cases of "mismatched" red blood cell transfusion have occurred during this interval. There is an inverse relationship between resources/time expended on quality and risk management relative to volumes of operations in the TS. Laboratory-based initiatives that improve patient safety and clinical outcomes need to have resources aligned with the personnel and time required for quality management and risk management. Copyright © 2012 Elsevier Inc. All rights reserved.

  6. Improving Information Security Risk Management

    ERIC Educational Resources Information Center

    Singh, Anand

    2009-01-01

    manaOptimizing risk to information to protect the enterprise as well as to satisfy government and industry mandates is a core function of most information security departments. Risk management is the discipline that is focused on assessing, mitigating, monitoring and optimizing risks to information. Risk assessments and analyses are critical…

  7. Leading People, Managing Processes: School Business Administrators in the 21st Century.

    ERIC Educational Resources Information Center

    DiBella, Cecilia M.

    1999-01-01

    School business administrators must be both business managers and educators. As the school district's chief financial officer, the school business administrator must have strong communication and interpersonal skills. Spheres of involvement include working with school staff, parents, the district office, town officials and committees, vendors, and…

  8. Wildfire Risk Management: Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Thompson, M.; Calkin, D. E.; Hand, M. S.; Kreitler, J.

    2014-12-01

    In this presentation we address federal wildfire risk management largely through the lens of economics, targeting questions related to costs, effectiveness, efficiency, and tradeoffs. Beyond risks to resources and assets such as wildlife habitat, watersheds, and homes, wildfires present financial risk and budgetary instability for federal wildfire management agencies due to highly variable annual suppression costs. Despite its variability, the costs of wildfire management have continued to escalate and account for an ever-growing share of overall agency budgets, compromising abilities to attain other objectives related to forest health, recreation, timber management, etc. Trends associated with a changing climate and human expansion into fire-prone areas could lead to additional suppression costs in the future, only further highlighting the need for an ability to evaluate economic tradeoffs in investments across the wildfire management spectrum. Critically, these economic analyses need to accurately capture the complex spatial and stochastic aspects of wildfire, the inherent uncertainty associated with monetizing environmental impacts of wildfire, the costs and effectiveness of alternative management policies, and linkages between pre-fire investments and active incident management. Investing in hazardous fuels reduction and forest restoration in particular is a major policy lever for pre-fire risk mitigation, and will be a primary focus of our presentation. Evaluating alternative fuel management and suppression policies could provide opportunities for significant efficiency improvements in the development of risk-informed management fire management strategies. Better understanding tradeoffs of fire impacts and costs can help inform policy questions such as how much of the landscape to treat and how to balance investments in treating new areas versus maintaining previous investments. We will summarize current data needs, knowledge gaps, and other factors

  9. [Risk management from the judicial perspective].

    PubMed

    Ulsenheimer, Klaus

    2003-11-01

    The jurisdification of medicine is an unstoppable force that finds its visible expression in a medical liability boom which--apart from the negative impact of legal and out-of-court proceedings on the bond of the doctor-patient relationship--bears considerable economic disadvantages for the providers of care. It is therefore necessary to fight in particular the legally influenced causes of medical liability for which risk management seems to be a suitable, effective tool. As the examples taken from the jurisdiction in the organisational sector will demonstrate, risk management pinpoints the sources of trouble so that we are able to learn from current errors and provide appropriate remedies for the future. Risk management, though, is not a "unique event", but a dynamic, repetitive process that has to be institutionally secured by appointing a risk manager so that the proposals discussed, recommendations and essential measures can actually be implemented.

  10. 76 FR 45724 - Clearing Member Risk Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... Management AGENCY: Commodity Futures Trading Commission. ACTION: Notice of proposed rulemaking. SUMMARY: The... proposed rules address risk management for cleared trades by futures commission merchants, swap dealers... Commission has proposed extensive regulations addressing open access and risk management at the derivatives...

  11. Health Services Management in the Health Administration Curriculum. Report by the Curriculum Task Force on Administration.

    ERIC Educational Resources Information Center

    Association of Univ. Programs in Health Administration, Washington, DC.

    Critical decisions that need to be made by faculties of health administration education programs when developing and assessing the health services management portion of the curriculum are identified. Decisions should draw from the information available concerning professional target roles of graduates, graduate behavior expected, resources for…

  12. Peri-procedural risk stratification and management of patients with Williams syndrome.

    PubMed

    Collins Ii, R Thomas; Collins, Margaret G; Schmitz, Michael L; Hamrick, Justin T

    2017-03-01

    Williams syndrome (WS) is a congenital, multisystem disorder affecting the cardiovascular, connective tissue, and central nervous systems in 1 in 10 000 live births. Cardiovascular involvement is the most common cause of morbidity and mortality in patients with WS, and noninvasive and invasive procedures are common. Sudden cardiovascular collapse in patients with WS is a well-known phenomenon, especially in the peri-procedural period. Detailed guidelines for peri-procedural management of patients with WS are limited. The goal of this review is to provide thoughtful, safe and effective management strategies for the peri-procedural care of patients with WS with careful consideration of hemodynamic impacts of anesthetic strategies. In addition, an expanded risk stratification system for anesthetic administration is provided. © 2017 Wiley Periodicals, Inc.

  13. Sustainable nanotechnology decision support system: bridging risk management, sustainable innovation and risk governance

    NASA Astrophysics Data System (ADS)

    Subramanian, Vrishali; Semenzin, Elena; Hristozov, Danail; Zabeo, Alex; Malsch, Ineke; McAlea, Eamonn; Murphy, Finbarr; Mullins, Martin; van Harmelen, Toon; Ligthart, Tom; Linkov, Igor; Marcomini, Antonio

    2016-04-01

    The significant uncertainties associated with the (eco)toxicological risks of engineered nanomaterials pose challenges to the development of nano-enabled products toward greatest possible societal benefit. This paper argues for the use of risk governance approaches to manage nanotechnology risks and sustainability, and considers the links between these concepts. Further, seven risk assessment and management criteria relevant to risk governance are defined: (a) life cycle thinking, (b) triple bottom line, (c) inclusion of stakeholders, (d) risk management, (e) benefit-risk assessment, (f) consideration of uncertainty, and (g) adaptive response. These criteria are used to compare five well-developed nanotechnology frameworks: International Risk Governance Council framework, Comprehensive Environmental Assessment, Streaming Life Cycle Risk Assessment, Certifiable Nanospecific Risk Management and Monitoring System and LICARA NanoSCAN. A Sustainable Nanotechnology Decision Support System (SUNDS) is proposed to better address current nanotechnology risk assessment and management needs, and makes. Stakeholder needs were solicited for further SUNDS enhancement through a stakeholder workshop that included representatives from regulatory, industry and insurance sectors. Workshop participants expressed the need for the wider adoption of sustainability assessment methods and tools for designing greener nanomaterials.

  14. 77 FR 28854 - Proposed Information Collection; Comment Request; Coastal Zone Management Program Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... federally approved coastal management programs; complete information for the Coastal Zone Management Program.... Gwellnar Banks, Management Analyst, Office of the Chief Information Officer. [FR Doc. 2012-11777 Filed 5-15... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information...

  15. [What Surgeons Should Know about Risk Management].

    PubMed

    Strametz, R; Tannheimer, M; Rall, M

    2017-02-01

    Background: The fact that medical treatment is associated with errors has long been recognized. Based on the principle of "first do no harm", numerous efforts have since been made to prevent such errors or limit their impact. However, recent statistics show that these measures do not sufficiently prevent grave mistakes with serious consequences. Preventable mistakes such as wrong patient or wrong site surgery still frequently occur in error statistics. Methods: Based on insight from research on human error, in due consideration of recent legislative regulations in Germany, the authors give an overview of the clinical risk management tools needed to identify risks in surgery, analyse their causes, and determine adequate measures to manage those risks depending on their relevance. The use and limitations of critical incident reporting systems (CIRS), safety checklists and crisis resource management (CRM) are highlighted. Also the rationale for IT systems to support the risk management process is addressed. Results/Conclusion: No single tool of risk management can be effective as a standalone instrument, but unfolds its effect only when embedded in a superordinate risk management system, which integrates tailor-made elements to increase patient safety into the workflows of each organisation. Competence in choosing adequate tools, effective IT systems to support the risk management process as well as leadership and commitment to constructive handling of human error are crucial components to establish a safety culture in surgery. Georg Thieme Verlag KG Stuttgart · New York.

  16. Administration of Child Care Programs: Business Management. Instructor's Guide.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock. Home Economics Curriculum Center.

    Designed for use by postsecondary child development instructors, this guide is organized into four units that expose students to the general competencies and business management aspects of child care program administration. Introductory materials discuss the use of the materials and provide guidelines for evaluating students. The four units cover…

  17. 42 CFR 417.412 - Qualifying condition: Administration and management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Qualifying condition: Administration and management. 417.412 Section 417.412 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS...

  18. Risk management modeling and its application in maritime safety

    NASA Astrophysics Data System (ADS)

    Qin, Ting-Rong; Chen, Wei-Jiong; Zeng, Xiang-Kun

    2008-12-01

    Quantified risk assessment (QRA) needs mathematicization of risk theory. However, attention has been paid almost exclusively to applications of assessment methods, which has led to neglect of research into fundamental theories, such as the relationships among risk, safety, danger, and so on. In order to solve this problem, as a first step, fundamental theoretical relationships about risk and risk management were analyzed for this paper in the light of mathematics, and then illustrated with some charts. Second, man-machine-environment-management (MMEM) theory was introduced into risk theory to analyze some properties of risk. On the basis of this, a three-dimensional model of risk management was established that includes: a goal dimension; a management dimension; an operation dimension. This goal management operation (GMO) model was explained and then emphasis was laid on the discussion of the risk flowchart (operation dimension), which lays the groundwork for further study of risk management and qualitative and quantitative assessment. Next, the relationship between Formal Safety Assessment (FSA) and Risk Management was researched. This revealed that the FSA method, which the international maritime organization (IMO) is actively spreading, comes from Risk Management theory. Finally, conclusion were made about how to apply this risk management method to concrete fields efficiently and conveniently, as well as areas where further research is required.

  19. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  20. Managing health and safety risks: Implications for tailoring health and safety management system practices.

    PubMed

    Willmer, D R; Haas, E J

    2016-01-01

    As national and international health and safety management system (HSMS) standards are voluntarily accepted or regulated into practice, organizations are making an effort to modify and integrate strategic elements of a connected management system into their daily risk management practices. In high-risk industries such as mining, that effort takes on added importance. The mining industry has long recognized the importance of a more integrated approach to recognizing and responding to site-specific risks, encouraging the adoption of a risk-based management framework. Recently, the U.S. National Mining Association led the development of an industry-specific HSMS built on the strategic frameworks of ANSI: Z10, OHSAS 18001, The American Chemistry Council's Responsible Care, and ILO-OSH 2001. All of these standards provide strategic guidance and focus on how to incorporate a plan-do-check-act cycle into the identification, management and evaluation of worksite risks. This paper details an exploratory study into whether practices associated with executing a risk-based management framework are visible through the actions of an organization's site-level management of health and safety risks. The results of this study show ways that site-level leaders manage day-to-day risk at their operations that can be characterized according to practices associated with a risk-based management framework. Having tangible operational examples of day-to-day risk management can serve as a starting point for evaluating field-level risk assessment efforts and their alignment to overall company efforts at effective risk mitigation through a HSMS or other processes.

  1. Impact of electronic order management on the timeliness of antibiotic administration in critical care patients.

    PubMed

    Cartmill, Randi S; Walker, James M; Blosky, Mary Ann; Brown, Roger L; Djurkovic, Svetolik; Dunham, Deborah B; Gardill, Debra; Haupt, Marilyn T; Parry, Dean; Wetterneck, Tosha B; Wood, Kenneth E; Carayon, Pascale

    2012-11-01

    To examine the effect of implementing electronic order management on the timely administration of antibiotics to critical-care patients. We used a prospective pre-post design, collecting data on first-dose IV antibiotic orders before and after the implementation of an integrated electronic medication-management system, which included computerized provider order entry (CPOE), pharmacy order processing and an electronic medication administration record (eMAR). The research was performed in a 24-bed adult medical/surgical ICU in a large, rural, tertiary medical center. Data on the time of ordering, pharmacy processing and administration were prospectively collected and time intervals for each stage and the overall process were calculated. The overall turnaround time from ordering to administration significantly decreased from a median of 100 min before order management implementation to a median of 64 min after implementation. The first part of the medication use process, i.e., from order entry to pharmacy processing, improved significantly whereas no change was observed in the phase from pharmacy processing to medication administration. The implementation of an electronic order-management system improved the timeliness of antibiotic administration to critical-care patients. Additional system changes are required to further decrease the turnaround time. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  2. Administrative database research has unique characteristics that can risk biased results.

    PubMed

    van Walraven, Carl; Austin, Peter

    2012-02-01

    The provision of health care frequently creates digitized data--such as physician service claims, medication prescription records, and hospitalization abstracts--that can be used to conduct studies termed "administrative database research." While most guidelines for assessing the validity of observational studies apply to administrative database research, the unique data source and analytical opportunities for these studies create risks that can make them uninterpretable or bias their results. Nonsystematic review. The risks of uninterpretable or biased results can be minimized by; providing a robust description of the data tables used, focusing on both why and how they were created; measuring and reporting the accuracy of diagnostic and procedural codes used; distinguishing between clinical significance and statistical significance; properly accounting for any time-dependent nature of variables; and analyzing clustered data properly to explore its influence on study outcomes. This article reviewed these five issues as they pertain to administrative database research to help maximize the utility of these studies for both readers and writers. Copyright © 2012 Elsevier Inc. All rights reserved.

  3. 51. Roof plans, General Services Administration, Construction Management Division, Region ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Roof plans, General Services Administration, Construction Management Division, Region 2, New York, October 29, 1976. Scale 1/31=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  4. Research on Risk Management and Power Supplying Enterprise Control

    NASA Astrophysics Data System (ADS)

    Shen, Jianfei; Wang, Yige

    2017-09-01

    This paper derived from the background that electric power enterprises strengthen their risk management under requirements of the government. For the power industry, we explained the risk management theory, analysed current macro environment as well as basic situation, then classified and interpreted the main risks. In a case study on a power bureau, we established a risk management system based on deep understanding about the characteristics of its organization system and risk management function. Then, we focused on risks in operation as well as incorrupt government construction to give a more effective framework of the risk management system. Finally, we came up with the problems and specific countermeasures in risk management, which provided a reference for other electric power enterprises.

  5. Risk Management Issues When Taking Locum Tenens Assignments.

    PubMed

    Cash, Charles D

    2017-01-01

    This ongoing column is dedicated to providing information to our readers on managing legal risks associated with medical practice. We invite questions from our readers. The answers are provided by PRMS, Inc. (www.prms.com), a manager of medical professional liability insurance programs with services that include risk management consultation, education and onsite risk management audits, and other resources to healthcare providers to help improve patient outcomes and reduce professional liability risk. The answers published in this column represent those of only one risk management consulting company. Other risk management consulting companies or insurance carriers may provide different advice, and readers should take this into consideration. The information in this column does not constitute legal advice. For legal advice, contact your personal attorney. Note: The information and recommendations in this article are applicable to physicians and other healthcare professionals so "clinician" is used to indicate all treatment team members.

  6. [Hospital risk management from the viewpoint of insurers].

    PubMed

    Gausmann, Peter; Petry, Franz Michael

    2004-10-01

    The present article deals with the significance of risk management in hospitals from the viewpoint of liability insurers. From the perspective of insurance companies, the liability risk of a hospital and its personnel has considerably increased during the past 25 years. The present risk situation is characterized by a growing number of reported liability cases, as well as by an enormous increase of average compensation claims. This development has led some insurance companies to financial deficits in the segment of hospital liability. While some insurers have withdrawn their activities from this market segment, others have reacted by raising their premiums. Since in Germany the premiums usually depend on the number of beds held by a hospital, the problem of rising premiums is exacerbated by the general increase of the number of clinical cases in the face of a parallel reduction of the number of beds. In the process of finding new criteria or methods for adequate premium calculation, a key role will be played by the individual future risk development of a hospital and by the evaluation of this risk by its insurance company. An extensive system of clinical quality management supported by elements of risk management will have persistent positive effects on the development of individual insurance premiums and on the insurability of clinical liability. Risk management is defined as the totality of measures taken by a company to identify risks that could lead to reduced success. Clinical risk management must be regarded in the context of a general trend that is not limited to the field of health service. In this process, the handling of errors and their causes plays a central role. Further variants of hospital risk management are the technical and economic risk management, both of which are increasingly important and are in part implemented in the German legislation. Clinical risk management has originated from the U.S., where as early as in the nineteen

  7. Presidential Commission on Risk Assessment and Risk Management

    EPA Science Inventory

    September 26, 1997. The Presidential/Congressional Commission on Risk Assessment and Risk Management, which was mandated as part of the Clean Air Act Amendments of 1990, was disbanded on August 31, 1997, with some staff work continuing into September. The reports and asso...

  8. Time Management in Higher Education Administration: A Case Study

    ERIC Educational Resources Information Center

    Lewis, Darrell R.; Dahl, Tor

    1976-01-01

    Drawing on data from a staff development project for administrators in a college at a major American university, it was determined that there is considerable commonality across individuals and that it is possible to deal with such issues as time management, job stress, and enjoyment on an organizational level. (Editor/JT)

  9. Time Management in Higher Education Administration: A Case Study.

    ERIC Educational Resources Information Center

    Lewis, Darrell R.; Dahl, Tor

    How do departmental chairpersons and deans in a major university setting manage their time? What are the major administrative activities and functions associated with such responsibilities? What relationships do these have with an ability to delegate, to control one's time for planning and self-initiated activities, or personal sense of…

  10. Assessment of the Business Administration and Business Management Programs.

    ERIC Educational Resources Information Center

    Forestieri, Kathleen; Karlen, Janice; Coiro, Robert; Gabriel, Theodore; Leff, Elaine; Silverman, Barry; Wertheimer, David

    This document presents City University of New York LaGuardia Community College's Department of Accounting and Managerial Studies assessment of its business and administration and business management programs report, and includes the following items: (1) a description of the mission and goals of the Department of Accounting and Managerial Studies;…

  11. Business Administration and Management: Current Trends and Future Directions.

    ERIC Educational Resources Information Center

    Flewellen, William C., Jr.

    Drawing from site visits to 39 public and private colleges in Massachusetts, this report presents an evaluation of college programs in business administration and management and recommendations for improvement. Section 1 provides an overview of the statewide study and its findings. After identifying the colleges visited and the members of the…

  12. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering

  13. The Role of Risk and Risk Management in Experiential Education.

    ERIC Educational Resources Information Center

    Mobley, Michael

    A monograph examines the role of risk and risk management in experiential education, particularly stress/challenge programming. Definitions of risk are presented. The importance of risk and stress in experiential education is emphasized. Implications of subjective versus objective risk assessment in adventure education are discussed, with…

  14. GREMEX - A management game for the new public administration.

    NASA Technical Reports Server (NTRS)

    Mcgregor, E. B.; Baker, R. F.

    1972-01-01

    This is a critique of a new management game being used in the federal government - Goddard Research Engineering Management Exercise (GREMEX). The exercise involves teams of players who act as managers of a research and development project - the orbiting optical observatory - of the National Aeronautics and Space Administration. During this exercise a computer and the referee-instructor together provide the realistic environment within which the team participants make their decisions affecting the course of the project. The article discusses the place of GREMEX in a tradition of games and simulations, and notes the similarities and differences between GREMEX and other management games currently in use for business training. Some of the actual decisions being made by the GREMEX teams are described to illustrate the nature of the exercise.

  15. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  16. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  17. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  18. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  19. Analysis of interactions among barriers in project risk management

    NASA Astrophysics Data System (ADS)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  20. 7 CFR 760.104 - Risk management purchase requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Risk management purchase requirements. 760.104 Section... Agricultural Disaster Assistance Programs § 760.104 Risk management purchase requirements. (a) To be eligible... available from the USDA Risk Management Agency (RMA)) obtained catastrophic coverage or better under a...

  1. 7 CFR 760.104 - Risk management purchase requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Risk management purchase requirements. 760.104 Section... Agricultural Disaster Assistance Programs § 760.104 Risk management purchase requirements. (a) To be eligible... available from the USDA Risk Management Agency (RMA)) obtained catastrophic coverage or better under a...

  2. Risk Management Issues When Taking Locum Tenens Assignments

    PubMed Central

    Cash, Charles D.

    2017-01-01

    This ongoing column is dedicated to providing information to our readers on managing legal risks associated with medical practice. We invite questions from our readers. The answers are provided by PRMS, Inc. (www.prms.com), a manager of medical professional liability insurance programs with services that include risk management consultation, education and onsite risk management audits, and other resources to healthcare providers to help improve patient outcomes and reduce professional liability risk. The answers published in this column represent those of only one risk management consulting company. Other risk management consulting companies or insurance carriers may provide different advice, and readers should take this into consideration. The information in this column does not constitute legal advice. For legal advice, contact your personal attorney. Note: The information and recommendations in this article are applicable to physicians and other healthcare professionals so “clinician” is used to indicate all treatment team members. PMID:28386523

  3. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    EPA Pesticide Factsheets

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  4. Intermittent subcutaneous methadone administration in the management of cancer pain.

    PubMed

    Centeno, Carlos; Vara, Francisco

    2005-01-01

    Methadone is a strong opioid analgesic that has been used successfully in cancer pain management. The oral route of administration is generally preferred for opioid analgesics. However that route sometimes cannot be used. Experience with continuous subcutaneous methadone infusions has produced local intolerance. The aim of this study was to analyze the use of intermittent subcutaneous methadone injections. Ten patients whose pain was well-controlled with oral methadone (average dose 30 mg, range 10 to 120 mg) participated in the study. A subcutaneous small vein needle (butterfly) was used exclusively for administration of methadone. Over a period of seven days the local discomfort of each injection was evaluated by means of a Verbal Numerical Rating Scale (NRS) and the site of infusion was observed. When any degree of erythema or inflammation was seen, the infusion site was changed. The initial subcutaneous dose was the same as the previously administered oral dose. A daily record was kept of the dose used, level of pain, and toxicity symptoms. This close vigilance was aimed at avoiding dosage errors due to variations among individuals in acceptance to previous oral medication. Changes in dosage were allowed according to standard medical criteria. Two patients were withdrawn from the study due to non-painful irritation at the infusion point. Another eight patients tolerated repeated administration of subcutaneous methadone over seven days. Any local irritation from subcutaneous methadone that occurred was managed satisfactorily by changing the infusion site and limiting doses to 30 mg. In seven of 182 repeat administration, injection site changes were necessitated by local irritation. The NRS for local discomfort was 2/10. The two patients who were intolerant of the subcutaneous injections were receiving injected doses which were significantly higher than the others (42 mg as compared to 25 mg). Dose adjustments needed when changing from the oral to the

  5. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    ERIC Educational Resources Information Center

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  6. Risk taking and effective R&D management.

    PubMed

    Banholzer, William F; Vosejpka, Laura J

    2011-01-01

    Several key strategies can be used to manage the risk associated with innovation to create maximum value. These include balancing the timing of investments versus cash flows, management of fads, prioritization across the company, savvy portfolio management, and a system of metrics that measure real success. Successful R&D managers will do whatever is necessary to manage the risks associated with an R&D program and stick to their long-term strategy.

  7. Perspectives on Subcutaneous Route of Administration as an Immunogenicity Risk Factor for Therapeutic Proteins.

    PubMed

    Hamuro, Lora; Kijanka, Grzegorz; Kinderman, Francis; Kropshofer, Harald; Bu, De-Xiu; Zepeda, Monica; Jawa, Vibha

    2017-10-01

    An increasing number of therapeutic proteins are being developed for delivery through the subcutaneous (SC) route of administration. Relative to intravenous (IV) administration, the SC route offers more convenience to patients, flexibility in dosing, and potential to reduce health care costs. There is a perception that SC administration can pose a higher immunogenicity risk than IV administration for a given protein. To evaluate whether there is a difference in therapeutic protein immunogenicity associated with administration routes, a more detailed understanding of the interactions with the immune system by each route is needed. Few approved therapeutic proteins have available clinical immunogenicity data sets in the public domain that represent both IV and SC administration routes. This has prevented a direct comparison of the 2 routes of administration across a large sample size. Of the 6 marketed products where SC and IV route-related incidences of anti-drug antibody (ADA) were available, 4 were associated with higher immunogenicity incidence with SC. In other cases, there was no apparent difference between the SC and IV routes. Overall, the ADA incidence was low (<15%) with no impact on safety or efficacy. The challenges associated with identifying specific risk factors unique to SC administration are discussed. Copyright © 2017 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.

  8. Cross-Cutting Risk Framework: Mining Data for Common Risks Across the Portfolio

    NASA Technical Reports Server (NTRS)

    Klein, Gerald A., Jr.; Ruark, Valerie

    2017-01-01

    The National Aeronautics and Space Administration (NASA) defines risk management as an integrated framework, combining risk-informed decision making and continuous risk management to foster forward-thinking and decision making from an integrated risk perspective. Therefore, decision makers must have access to risks outside of their own project to gain the knowledge that provides the integrated risk perspective. Through the Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) Business Change Initiative (BCI), risks were integrated into one repository to facilitate access to risk data between projects. With the centralized repository, communications between the FPD, project managers, and risk managers improved and GSFC created the cross-cutting risk framework (CCRF) team. The creation of the consolidated risk repository, in parallel with the initiation of monthly FPD risk managers and risk governance board meetings, are now providing a complete risk management picture spanning the entire directorate. This paper will describe the challenges, methodologies, tools, and techniques used to develop the CCRF, and the lessons learned as the team collectively worked to identify risks that FPD programs projects had in common, both past and present.

  9. 2015/2016 Quality Risk Management Benchmarking Survey.

    PubMed

    Waldron, Kelly; Ramnarine, Emma; Hartman, Jeffrey

    2017-01-01

    This paper investigates the concept of quality risk management (QRM) maturity as it applies to the pharmaceutical and biopharmaceutical industries, using the results and analysis from a QRM benchmarking survey conducted in 2015 and 2016. QRM maturity can be defined as the effectiveness and efficiency of a quality risk management program, moving beyond "check-the-box" compliance with guidelines such as ICH Q9 Quality Risk Management , to explore the value QRM brings to business and quality operations. While significant progress has been made towards full adoption of QRM principles and practices across industry, the full benefits of QRM have not yet been fully realized. The results of the QRM Benchmarking Survey indicate that the pharmaceutical and biopharmaceutical industries are approximately halfway along the journey towards full QRM maturity. LAY ABSTRACT: The management of risks associated with medicinal product quality and patient safety are an important focus for the pharmaceutical and biopharmaceutical industries. These risks are identified, analyzed, and controlled through a defined process called quality risk management (QRM), which seeks to protect the patient from potential quality-related risks. This paper summarizes the outcomes of a comprehensive survey of industry practitioners performed in 2015 and 2016 that aimed to benchmark the level of maturity with regard to the application of QRM. The survey results and subsequent analysis revealed that the pharmaceutical and biopharmaceutical industries have made significant progress in the management of quality risks over the last ten years, and they are roughly halfway towards reaching full maturity of QRM. © PDA, Inc. 2017.

  10. Injection device-related risk management toward safe administration of medications: experience in a university teaching hospital in The People's Republic of China.

    PubMed

    Zhu, Ling-Ling; Li, Wei; Song, Ping; Zhou, Quan

    2014-01-01

    The use of injection devices to administer intravenous or subcutaneous medications is common practice throughout a variety of health care settings. Studies suggest that one-half of all harmful medication errors originate during drug administration; of those errors, about two-thirds involve injectables. Therefore, injection device management is pivotal to safe administration of medications. In this article, the authors summarize the relevant experiences by retrospective analysis of injection device-related near misses and adverse events in the Second Affiliated Hospital of Zhejiang University, School of Medicine, Zhejiang University, People's Republic of China. Injection device-related near misses and adverse events comprised the following: 1) improper selection of needle diameter for subcutaneous injection, material of infusion sets, and pore size of in-line filter; 2) complications associated with vascular access; 3) incidents induced by absence of efficient electronic pump management and infusion tube management; and 4) liquid leakage of chemotherapeutic infusion around the syringe needle. Safe injection drug use was enhanced by multidisciplinary collaboration, especially among pharmacists and nurses; drafting of clinical pathways in selection of vascular access; application of approaches such as root cause analysis using a fishbone diagram; plan-do-check-act and quality control circle; and construction of a culture of spontaneous reporting of near misses and adverse events. Pharmacists must be professional in regards to medication management and use. The depth, breadth, and efficiency of cooperation between nurses and pharmacists are pivotal to injection safety.

  11. Food and Drug Administration Evaluation and Cigarette Smoking Risk Perceptions

    ERIC Educational Resources Information Center

    Kaufman, Annette R.; Waters, Erika A.; Parascandola, Mark; Augustson, Erik M.; Bansal-Travers, Maansi; Hyland, Andrew; Cummings, K. Michael

    2011-01-01

    Objectives: To examine the relationship between a belief about Food and Drug Administration (FDA) safety evaluation of cigarettes and smoking risk perceptions. Methods: A nationally representative, random-digit-dialed telephone survey of 1046 adult current cigarette smokers. Results: Smokers reporting that the FDA does not evaluate cigarettes for…

  12. Experiences with Lean Six Sigma as improvement strategy to reduce parenteral medication administration errors and associated potential risk of harm.

    PubMed

    van de Plas, Afke; Slikkerveer, Mariëlle; Hoen, Saskia; Schrijnemakers, Rick; Driessen, Johanna; de Vries, Frank; van den Bemt, Patricia

    2017-01-01

    In this controlled before-after study the effect of improvements, derived from Lean Six Sigma strategy, on parenteral medication administration errors and the potential risk of harm was determined. During baseline measurement, on control versus intervention ward, at least one administration error occurred in 14 (74%) and 6 (46%) administrations with potential risk of harm in 6 (32%) and 1 (8%) administrations. Most administration errors with high potential risk of harm occurred in bolus injections: 8 (57%) versus 2 (67%) bolus injections were injected too fast with a potential risk of harm in 6 (43%) and 1 (33%) bolus injections on control and intervention ward. Implemented improvement strategies, based on major causes of too fast administration of bolus injections, were: Substitution of bolus injections by infusions, education, availability of administration information and drug round tabards. Post intervention, on the control ward in 76 (76%) administrations at least one error was made (RR 1.03; CI95:0.77-1.38), with a potential risk of harm in 14 (14%) administrations (RR 0.45; CI95:0.20-1.02). In 40 (68%) administrations on the intervention ward at least one error occurred (RR 1.47; CI95:0.80-2.71) but no administrations were associated with a potential risk of harm. A shift in wrong duration administration errors from bolus injections to infusions, with a reduction of potential risk of harm, seems to have occurred on the intervention ward. Although data are insufficient to prove an effect, Lean Six Sigma was experienced as a suitable strategy to select tailored improvements. Further studies are required to prove the effect of the strategy on parenteral medication administration errors.

  13. Experiences with Lean Six Sigma as improvement strategy to reduce parenteral medication administration errors and associated potential risk of harm

    PubMed Central

    van de Plas, Afke; Slikkerveer, Mariëlle; Hoen, Saskia; Schrijnemakers, Rick; Driessen, Johanna; de Vries, Frank; van den Bemt, Patricia

    2017-01-01

    In this controlled before-after study the effect of improvements, derived from Lean Six Sigma strategy, on parenteral medication administration errors and the potential risk of harm was determined. During baseline measurement, on control versus intervention ward, at least one administration error occurred in 14 (74%) and 6 (46%) administrations with potential risk of harm in 6 (32%) and 1 (8%) administrations. Most administration errors with high potential risk of harm occurred in bolus injections: 8 (57%) versus 2 (67%) bolus injections were injected too fast with a potential risk of harm in 6 (43%) and 1 (33%) bolus injections on control and intervention ward. Implemented improvement strategies, based on major causes of too fast administration of bolus injections, were: Substitution of bolus injections by infusions, education, availability of administration information and drug round tabards. Post intervention, on the control ward in 76 (76%) administrations at least one error was made (RR 1.03; CI95:0.77-1.38), with a potential risk of harm in 14 (14%) administrations (RR 0.45; CI95:0.20-1.02). In 40 (68%) administrations on the intervention ward at least one error occurred (RR 1.47; CI95:0.80-2.71) but no administrations were associated with a potential risk of harm. A shift in wrong duration administration errors from bolus injections to infusions, with a reduction of potential risk of harm, seems to have occurred on the intervention ward. Although data are insufficient to prove an effect, Lean Six Sigma was experienced as a suitable strategy to select tailored improvements. Further studies are required to prove the effect of the strategy on parenteral medication administration errors. PMID:28674608

  14. Development of an effective risk management system in a teaching hospital.

    PubMed

    Adibi, Hossein; Khalesi, Nader; Ravaghi, Hamid; Jafari, Mahdi; Jeddian, Ali Reza

    2012-09-21

    Unsafe health care provision is a main cause of increased mortality rate amongst hospitalized patients all over the world. A system approach to medical error and its reduction is crucial that is defined by clinical and administrative activities undertaken to identify, evaluate, and reduce the risk of injury. The aim of this study was to develop and implement a risk management system in a large teaching hospital in Iran, especially of the basis of WHO guidelines and patient safety context. WHO draft guideline and patient safety reports from different countries were reviewed for defining acceptable framework of risk management system. Also current situation of mentioned hospital in safety matter and dimensions of patient safety culture was evaluated using HSOPSC questionnaire of AHRQ. With adjustment of guidelines and hospital status, the conceptual framework was developed and next it was validated in expert panel. The members of expert panel were selected according to their role and functions and also their experiences in risk management and patient safety issues. The validated framework consisted of designating a leader and coordinator core, defining communications, and preparing the infrastructure for patient safety education and culture-building. That was developed on the basis of some values and commitments and included reactive and proactive approaches. The findings of reporting activities demonstrated that at least 3.6 percent of hospitalized patients have experienced adverse events and 5.3 percent of all deaths in the hospital related with patient safety problems. Beside the average score of 12 dimensions of patient safety culture was 46.2 percent that was considerably low. The "non-punitive responses to error" had lowest positive score with 21.2 percent. It is of paramount importance for all health organizations to lay necessary foundations in order to identify safety risks and improve the quality of care. Inadequate participation of staff in education

  15. Today's School Risk Manager

    ERIC Educational Resources Information Center

    Johnson, Cheryl P.; Levering, Steve

    2009-01-01

    School districts are held accountable not only for the monies that contribute to the education system but also for mitigating any issues that threaten student learning. Some school districts are fortunate to have professional risk managers on staff who can identify and control the many risks that are unique to school systems. Most schools,…

  16. Managing Risk in Systems Development.

    ERIC Educational Resources Information Center

    DePaoli, Marilyn M.; And Others

    Stanford University's use of a risk assessment methodology to improve the management of systems development projects is discussed. After examining the concepts of hazard, peril, and risk as they relate to the system development process, three ways to assess risk are covered: size, structure, and technology. The overall objective for Stanford…

  17. [MANAGEMENT OF HEALTHCARE WASTE IN THE HOSPITAL SETTING. UNDERSTANDING RISK MANAGEMENT].

    PubMed

    Galimany-Masclans, Jordi; Torres-Egea, Pilar; Sancho-Agredano, Raúl; Girbau-García, Ma Rosa; Fabrellas, Núria; Torrens-Garcia, Ma Llum; Martínez-Estalella, Gemma

    2015-05-01

    The sanitary waste represents a potential hazard for health workers. Given the high risk of infection in labor accidents, the correct management of sanitary waste minimizes this risk and improves labor and environment conditions. To identify risk perception with health professionals in relation to the advanced sorting and management of healthcare waste (HW). The current study is a descriptive, cross-sectional. The sample size was 177 health workers (nurse assistants, nurses, physicians, lab technicians) from three hospitals in Barcelona (Catalonia). Homemade questionnaire and questions with a free and spontaneous association and incomplete sentences were used to analyze labor variables, perception of risk and personal security through a Likert scale. Using a score from 1 (the lowest perception of risk) to 5 (the high perception of risk) to assess the risk perception, the average value for nurse assistants, nurses, physicians, and lab technicians was 3.71, 3.75, 3.83 and 4.03, respectively. Referring to items with free and spontaneous response association, 44.8% of workers consider HW as a biohazard, 29.6% consider it as waste material, 22.1% state that it must be managed properly and 3.5% described it as unknown residues. The results suggest that all health professionals generally have a perception of high risk. The lab technicians have a higher perception of the real risk of inadequate management of HW A 63.2% report that everyone has to make a proper management to preserve their occupational health; the 59% consider that the HW are a biological risk to the general population and only the 47.8% that are harmful to public health. Although it should be noted that only 44.8% think that HW are toxic and dangerous.

  18. School Crisis Management Manual: Guidelines for Administrators. Second Edition.

    ERIC Educational Resources Information Center

    Smith, Judie

    This three-part manual is intended for principals and other administrators responsible for developing and managing school crisis plans. Part 1, preparation for a school crisis, includes sections on the selection and training of members of the school crisis team, steps in developing a school crisis plan, and four crisis scenarios to train team…

  19. A Framework for Drought Risk Management

    NASA Astrophysics Data System (ADS)

    Apurv, T.; Cai, X.

    2016-12-01

    Drought is one of the most expensive natural disasters as it affects many sectors of the economy. The threat posed by droughts is expected to further increase due to increasing water demands fuelled by increasing population and also due to climate change in many regions. Management of the increasing drought risk requires shift from traditional crisis management approaches to long term strategic planning for reduction of drought risk. This study proposes a framework for management of long term drought risk. The framework uses the system based approach proposed by Tsakiris et al. (2013), in which a watershed is considered as a system and different water sources in the watershed (like groundwater, reservoirs, streams etc.) are considered as subsystems associated with certain water requirements of different sectors. Droughts are defined separately for each subsystem considering water availability and requirement. The percentile based drought indicator framework proposed by Steinemann et al. (2015) is used for defining drought for each subsystem, allowing the selection of thresholds, variables of interest, and time scale which are most relevant for stakeholders dependent on a particular subsystem. Future drought risk under different drought management strategies are assessed using hydrologic models that model both hydrologic and human components of a watershed. The robustness of a management strategy is assessed by simulating system response across a wide range of stochastically generated future climate scenarios. The framework is useful for operational drought management as it allows direct management of drought risks with consideration of different water sources and water users. Steinemann, A., Iacobellis, S.F., Cayan, D.R., (2015) "Developing and evaluating drought indicators for decision-making" J. Hydrometeor. 16 (4), 1793-1803 Tsakiris, G, Nalbantis, I, Vangelis, H, Verbeiren, B, Huysmans, M, Tychon, B, Jacquemin, I, Canters, F, Vanderhaegen, S, Engelen, G

  20. The effectiveness of risk management: an analysis of project risk planning across industries and countries.

    PubMed

    Zwikael, Ofer; Ahn, Mark

    2011-01-01

    This article examines the effectiveness of current risk management practices to reduce project risk using a multinational, multi-industry study across different scenarios and cultures. A survey was administered to 701 project managers, and their supervisors, in seven industries and three diverse countries (New Zealand, Israel, and Japan), in multiple languages during the 2002-2007 period. Results of this study show that project context--industry and country where a project is executed--significantly impacts perceived levels of project risk, and the intensity of risk management processes. Our findings also suggest that risk management moderates the relationship between risk level and project success. Specifically, we found that even moderate levels of risk management planning are sufficient to reduce the negative effect risk levels have on project success. © 2010 Society for Risk Analysis.

  1. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    NASA Technical Reports Server (NTRS)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  2. Managing Programmatic Risk for Complex Space System Developments

    NASA Technical Reports Server (NTRS)

    Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)

    2001-01-01

    Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

  3. Managing Liability. Employment Discrimination: A Risk Management Strategy.

    ERIC Educational Resources Information Center

    McMullan, Sandra H.

    This booklet discusses the risks that educational institutions face in regard to employment discrimination litigation and outlines a program to effectively manage such risks. Institutions need to address three main types of employment discrimination issues: sexual harassment, disability-based discrimination, and age discrimination. To deal with…

  4. Teacher Views on School Administrators' Organizational Power Sources and Their Change Management Behaviours

    ERIC Educational Resources Information Center

    Argon, Türkan; Dilekçi, Ümit

    2016-01-01

    This study aimed to determine school administrators' organizational power sources and change management behaviours based on Bolu central district primary and secondary school teachers' views. The study conducted with relational screening model reached 286 teachers. School Administrators' Organizational Power Sources Scale and Change Management…

  5. 12 CFR 652.30 - Interest rate risk management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 7 2014-01-01 2014-01-01 false Interest rate risk management. 652.30 Section... CORPORATION FUNDING AND FISCAL AFFAIRS § 652.30 Interest rate risk management. (a) The board of directors of... management and must be knowledgeable of the nature and level of interest rate risk taken by Farmer Mac. (b...

  6. Biosimilars: pharmacovigilance and risk management.

    PubMed

    Zuñiga, Leyre; Calvo, Begoña

    2010-07-01

    Biosimilars cannot be authorized based on the same requirements that apply to generic medicines. Despite the fact that the biosimilar and reference drug can show similar efficacy, the biosimilar may exhibit different safety profile in terms of nature, seriousness or incidence of adverse reactions. However, the data from pre-authorization clinical studies normally are insufficient to identify all potential differences. Therefore, clinical safety of similar biological medicinal products must be monitored closely on an ongoing basis during the post-approval phase including continued risk-benefit assessment. The biosimilar applicant must provide the European Medicines Agency (EMEA) with a risk management plan (EU-RMP) and pharmacovigilance programme with its application, including a description of the potential safety issues associated with the similar biological medicinal product that may be a result of differences in the manufacturing process from the reference biologic. The most critical safety concern relating to biopharmaceuticals (including biosimilars) is immunogenicity. Risk management applies scientifically based methodologies to identify, assess, communicate and minimise risk throughout a drug's life cycle so as to establish and maintain a favourable benefit-risk profile in patients. The risk management plan for biosimilars should focus on heightens the pharmacovigilance measures, identify immunogenicity risk and implement special post-marketing surveillance. Although International Nonproprietary Names (INNs) served as a useful tool in worldwide pharmacovigilance, for biologicals they should not be relied upon as the only means of product identification. Biologicals should always be commercialized with a brand name or the INN plus the manufacturer's name. (c) 2010 John Wiley & Sons, Ltd.

  7. Health Care Administrators. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    The result of a project to develop short courses to help health care administrators and supervisors in developing practical, up-to-date management skills, this instructional workbook provides information and exercises applicable to on-the-job situations. Unit I covers the following leadership considerations: self-awareness, time management,…

  8. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arp, J.A.; Burnett, R.A.; Downing, T.R.

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login privileges, and usage. Themore » system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links.« less

  9. Managing the three 'P's to improve patient safety: nursing administration's role in managing information technology.

    PubMed

    Simpson, Roy L

    2004-08-01

    The Institute of Medicine's landmark report asserted that medical error is seldom the fault of individuals, but the result of faulty healthcare policy/procedure systems. Numerous studies have shown that information technology (IT) can shore up weak systems. For nursing, IT plays a key role in eliminating nursing mistakes. However, managing IT is a function of managing the people who use it. For nursing administrators, successful IT implementations depend on adroit management of the three 'P's: People, processes and (computer) programs. This paper examines critical issues for managing each entity. It discusses the importance of developing trusting organizations, the requirements of process change, how to implement technology in harmony with the organization and the significance of vision.

  10. Integrated Risk and Knowledge Management Program -- IRKM-P

    NASA Technical Reports Server (NTRS)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  11. 12 CFR 563.176 - Interest-rate-risk-management procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interest-rate-risk-management procedures. 563... ASSOCIATIONS-OPERATIONS Financial Management Policies § 563.176 Interest-rate-risk-management procedures... association's management of that risk. (b) The board of directors shall formerly adopt a policy for the...

  12. 12 CFR 563.176 - Interest-rate-risk-management procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interest-rate-risk-management procedures. 563... ASSOCIATIONS-OPERATIONS Financial Management Policies § 563.176 Interest-rate-risk-management procedures... association's management of that risk. (b) The board of directors shall formerly adopt a policy for the...

  13. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  14. Draugen HSE-case - occupational health risk management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glas, J.J.P.; Kjaer, E.

    1996-12-31

    The Draugen HSE-Case serves as a risk management tool. Originally, risk management included only major safety hazards to personnel, environment and assets. Work Environment risks such as ergonomics, psycho-social factors and exposure to chemicals and noise, was not given the same attention. The Draugen HSE-Case addresses this weakness and extends all work environment risks. In order to promote line responsibility and commitment, relevant personnel is involved in the Case development. {open_quotes}THESIS{degrees}, a software application, is used to systematize input and to generate reports. The Draugen HSE-case encompasses: HSE risk analyses related to specific activities; Control of risk related to workmore » environment; Established tolerability criteria; Risk reducing measures; Emergency contingency measures; and Requirements for Competence and Follow-up. The development of Draugen HSE-Case is a continuous process. It will serve to minimize the potential of occupational illnesses, raise general awareness, and make occupational health management more cost-effective.« less

  15. Leading to Learn: Knowledge Management Enables Administrators to Excel as Instructional Leaders

    ERIC Educational Resources Information Center

    Weischadle, David E.

    2005-01-01

    The article discusses knowledge management as a means of changing the way administrators carry out their role as instructional leaders. Knowledge management utilizes many concepts from learning organizations, encourages the formation of communities of practice, and employs best practices as a means of leading others to improve learning. Instead of…

  16. Customer-Specific Transaction Risk Management in E-Commerce

    NASA Astrophysics Data System (ADS)

    Ruch, Markus; Sackmann, Stefan

    Increasing potential for turnover in e-commerce is inextricably linked with an increase in risk. Online retailers (e-tailers), aiming for a company-wide value orientation should manage this risk. However, current approaches to risk management either use average retail prices elevated by an overall risk premium or restrict the payment methods offered to customers. Thus, they neglect customer-specific value and risk attributes and leave turnover potentials unconsidered. To close this gap, an innovative valuation model is proposed in this contribution that integrates customer-specific risk and potential turnover. The approach presented evaluates different payment methods using their risk-turnover characteristic, provides a risk-adjusted decision basis for selecting payment methods and allows e-tailers to derive automated risk management decisions per customer and transaction without reducing turnover potential.

  17. Administrators in Action--Managing Public Monies and Processing Emotion in School Activities: A Teaching Case Study

    ERIC Educational Resources Information Center

    Tenuto, Penny L.; Gardiner, Mary E.; Yamamoto, Julie K.

    2015-01-01

    This teaching case describes school administrators in action performing day-to-day leadership tasks, managing public funds in school activities, and interacting with others appropriately. The case focuses on administrative challenges in handling and managing school activity funds. A method for processing emotion is discussed to assist…

  18. Back to basics--just how much should a risk manager know about risk financing?

    PubMed

    Miller, Vivian B

    2011-01-01

    Whether directly involved in development and implementation of the organization's risk financing program or not, risk management professionals, at the very least, need to be familiar with and understand the various risk financing strategies available to address all areas of exposure. This article addresses the types of coverages and risk financing options that should be considered when developing a comprehensive risk-financing program, and why it is important for risk management professionals to have some knowledge about these products, in order for their true value to be fully appreciated. © 2011 American Society for Healthcare Risk Management of the American Hospital Association.

  19. Administrative risk quantification of subcutaneous and intravenous therapies in Italian centers utilizing the Failure Mode and Effects Analysis approach.

    PubMed

    Ponzetti, Clemente; Canciani, Monica; Farina, Massimo; Era, Sara; Walzer, Stefan

    2016-01-01

    In oncology, an important parameter of safety is the potential treatment error in hospitals. The analyzed hypothesis is that of subcutaneous therapies would provide a superior safety benefit over intravenous therapies through fixed-dose administrations, when analyzed with trastuzumab and rituximab. For the calculation of risk levels, the Failure Mode and Effect Analysis approach was applied. Within this approach, the critical treatment path is followed and risk classification for each individual step is estimated. For oncology and hematology administration, 35 different risk steps were assessed. The study was executed in 17 hematology and 16 breast cancer centers in Italy. As intravenous and subcutaneous were the only injection routes in medical available for trastuzumab and rituximab in oncology at the time of the study, these two therapies were chosen. When the risk classes were calculated, eight high-risk areas were identified for the administration of an intravenous therapy in hematology or oncology; 13 areas would be defined as having a median-risk classification and 14 areas as having a low-risk classification (total risk areas: n=35). When the new subcutaneous formulation would be applied, 23 different risk levels could be completely eliminated (65% reduction). Important high-risk classes such as dose calculation, preparation and package labeling, preparation of the access to the vein, pump infusion preparation, and infusion monitoring were included in the eliminations. The overall risk level for the intravenous administration was estimated to be 756 (ex-ante) and could be reduced by 70% (ex-post). The potential harm compensation for errors related to pharmacy would be decreased from eight risk classes to only three risk classes. The subcutaneous administration of trastuzumab (breast cancer) and rituximab (hematology) might lower the risk of administration and treatment errors for patients and could hence indirectly have a positive financial impact for

  20. Forest management practices and the occupational safety and health administration logging standard

    Treesearch

    John R. Myers; David Elton Fosbroke

    1995-01-01

    The Occupational Safety and Health Administration (OSHA) has established safety and health regulations for the logging industry. These new regulations move beyond the prior OSHA pulpwood harvesting standard by including sawtimber harvesting operations. Because logging is a major tool used by forest managers to meet silvicultural goals, managers must be aware of what...

  1. Student Activities. Managing Liability.

    ERIC Educational Resources Information Center

    Bennett, Barbara; And Others

    This monograph suggests ways that college or university administrations can undertake a systematic and careful review of the risks posed by students' activities. Its purpose is to provide guidance in integrating the risk management process into a school's existing approaches to managing student organizations and activities. It is noted that no…

  2. Quantifying risk and accuracy in cancer risk assessment: the process and its role in risk management problem-solving.

    PubMed

    Turturro, A; Hart, R W

    1987-01-01

    A better understanding of chemical-induced cancer has led to appreciation of similarities to problems addressed by risk management of radiation-induced toxicity. Techniques developed for cancer risk assessment of toxic substances can be generalized to toxic agents. A recent problem-solving approach for risk management of toxic substances developed for the U.S. Department of Health and Human Services, and the role of risk assessment and how uncertainty should be treated within the context of this approach, is discussed. Finally, two different methods, research into the assumptions underlying risk assessment and the modification of risk assessment/risk management documents, are used to illustrate how the technique can be applied.

  3. Obstetrics Hospitalists: Risk Management Implications.

    PubMed

    Veltman, Larry

    2015-09-01

    The concept of having an in-house obstetrician (serving as an obstetrics [OB] hospitalist) available 24 hours a day, 7 days a week provides a safety net for OB events that many need immediate intervention for a successful outcome. A key precept of risk management, that of loss prevention, fits perfectly with the addition of an OB hospitalist role in the perinatal department. Inherent in the role of OB hospitalists are the patient safety and risk management principles of improved communication, enhanced readiness, and immediate availability. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. Factors increasing the risk of inactivity among administrative, technical, and manual workers in Warszawa public institutions.

    PubMed

    Biernat, Elżbieta

    2015-01-01

    The research aims to assess the level of physical activity among administrative, technical, and manual workers employed in Warszawa public institutions and to analyze the factors that increase the risk of failing to meet World Health Organization (WHO) recommendations. The study comprised 373 employees of randomly selected institutions. A short version of International Physical Activity Questionnaire (IPAQ) was applied. The correlation between the mean values of duration, days, MET-min/week of efforts, gender, and type of work was analyzed using the Tukey's honest significant difference (HSD) test, while the correlation between the level of physical activity and the socio-demographic characteristics was assessed with the Chi2 test. The strength of the relationship between socio-demographic characteristics and fulfilment of WHO standards was expressed by the odds ratio (OR) and 95% confidence interval (95% CI). The significance level was p = 0.05. High levels of physical activity were declared by 41.8% of the manual workers, 14.7% of the administration staff, and 7.3% of the technicians; 19%, 31.5% and 54.5%, respectively, reported low levels of physical activity. Factors determining the fulfilment of the WHO recommendations include: the nature of work (p = 0.003), education (p = 0.004), and income (p = 0.003). The risk of being inactive nearly doubles in the case of administration staff (31.5%) and increases more than 4 times in the case of technicians (54.5%). Respondents with secondary school education (31.6%) are exposed to a 3-fold higher risk of inactivity, while in respondents with higher education (37.2%), the level of the risk is 4-fold higher. Compared to those in the highest income group (23.4%), people who earn less (34.1%) are inactive almost twice as often. Urgent intervention is necessary in all studied groups: increased energy expenditure for recreation and locomotion, educational offers of employers to promote healthy lifestyle

  5. Managing Chemical & Material Risks

    DTIC Science & Technology

    2011-12-01

    Certification Program Acquisition, Technology and Logistics 9 DoD Hexavalent Chromium Risk Reduction Non- Chrome Primer II EXAVAJ ENT CHROM lrUMI...Royal Demolition eXplosive (RDX) • Cyclotrimethylenetrinitramine  Hexavalent Chromium (Cr6+) Naphthalene …pending downgrade to watch list Beryllium...T1me (secondo) 700 Acquisition, Technology and Logistics 10 Hexavalent Chromium Risk Management Actions • DoD minimization policy signed April

  6. The role of risk perception in making flood risk management more effective

    NASA Astrophysics Data System (ADS)

    Buchecker, M.; Salvini, G.; Di Baldassarre, G.; Semenzin, E.; Maidl, E.; Marcomini, A.

    2013-11-01

    Over the last few decades, Europe has suffered from a number of severe flood events and, as a result, there has been a growing interest in probing alternative approaches to managing flood risk via prevention measures. A literature review reveals that, although in the last decades risk evaluation has been recognized as key element of risk management, and risk assessment methodologies (including risk analysis and evaluation) have been improved by including social, economic, cultural, historical and political conditions, the theoretical schemes are not yet applied in practice. One main reason for this shortcoming is that risk perception literature is mainly of universal and theoretical nature and cannot provide the necessary details to implement a comprehensive risk evaluation. This paper therefore aims to explore a procedure that allows the inclusion of stakeholders' perceptions of prevention measures in risk assessment. It proposes to adopt methods of risk communication (both one-way and two-way communication) in risk assessment with the final aim of making flood risk management more effective. The proposed procedure not only focuses on the effect of discursive risk communication on risk perception, and on achieving a shared assessment of the prevention alternatives, but also considers the effects of the communication process on perceived uncertainties, accepted risk levels, and trust in the managing institutions. The effectiveness of this combined procedure has been studied and illustrated using the example of the participatory flood prevention assessment process on the Sihl River in Zurich, Switzerland. The main findings of the case study suggest that the proposed procedure performed well, but that it needs some adaptations for it to be applicable in different contexts and to allow a (semi-) quantitative estimation of risk perception to be used as an indicator of adaptive capacity.

  7. Evaluation of volcanic risk management in Merapi and Bromo Volcanoes

    NASA Astrophysics Data System (ADS)

    Bachri, S.; Stöetter, J.; Sartohadi, J.; Setiawan, M. A.

    2012-04-01

    Merapi (Central Java Province) and Bromo (East Java Province) volcanoes have human-environmental systems with unique characteristics, thus causing specific consequences on their risk management. Various efforts have been carried out by many parties (institutional government, scientists, and non-governmental organizations) to reduce the risk in these areas. However, it is likely that most of the actions have been done for temporary and partial purposes, leading to overlapping work and finally to a non-integrated scheme of volcanic risk management. This study, therefore, aims to identify and evaluate actions of risk and disaster reduction in Merapi and Bromo Volcanoes. To achieve this aims, a thorough literature review was carried out to identify earlier studies in both areas. Afterward, the basic concept of risk management cycle, consisting of risk assessment, risk reduction, event management and regeneration, is used to map those earlier studies and already implemented risk management actions in Merapi and Bromo. The results show that risk studies in Merapi have been developed predominantly on physical aspects of volcanic eruptions, i.e. models of lahar flows, hazard maps as well as other geophysical modeling. Furthermore, after the 2006 eruption of Merapi, research such on risk communication, social vulnerability, cultural vulnerability have appeared on the social side of risk management research. Apart from that, disaster risk management activities in the Bromo area were emphasizing on physical process and historical religious aspects. This overview of both study areas provides information on how risk studies have been used for managing the volcano disaster. This result confirms that most of earlier studies emphasize on the risk assessment and only few of them consider the risk reduction phase. Further investigation in this field work in the near future will accomplish the findings and contribute to formulate integrated volcanic risk management cycles for both

  8. Air quality risk management.

    PubMed

    Williams, Martin L

    2008-01-01

    Rather than attempt to provide a comprehensive account of air quality risk assessment, as might be found in a textbook or manual, this article discusses some issues that are of current importance in the United Kingdom and the rest of Europe, with special emphasis on risk assessment in the context of policy formulation, and emerging scientific knowledge. There are two pollutants of particular concern and that both pose challenges for risk assessment and policy, and they are particulate matter (PM) and ozone. The article describes some issues for health risk assessment and finally some forward-looking suggestions for future approaches to air quality management.

  9. Gaining hospital administrators' attention: ways to improve physician-hospital management dialogue.

    PubMed

    Cohn, Kenneth H; Gill, Sandra L; Schwartz, Richard W

    2005-02-01

    Despite marked differences in training and professional interests, physicians and hospital managers face similar problems stemming from the unprecedented rate of change in the health care delivery system: failure of reimbursement to keep pace with rising costs, new therapeutic modalities, increasing government and managed care regulations, heightened consumerism, and an aging patient population. In the face of these mounting challenges, both physicians and hospital managers could benefit significantly from a climate of collaboration and interdependence. This article presents a "case report" of a community teaching hospital in which practicing physicians and hospital administrators collaborated to develop an operating plan for the next 3 years to improve the practice environment. The physicians recommended new clinical priorities to enhance service to patients and families, to improve physician-physician communication, to develop clinical protocols, and to build coordinated diagnostic treatment centers, which the administration has implemented. Physicians and hospital managers can no longer pass on cost increases at will to patients and third-party payers. Nor can physicians and managers ignore the heightened power of patients and third-party payers. Effective dialogue and collaboration are in all parties' interests to optimize patient care and to develop innovative services. Despite the tensions created by competition and rapid change, transformation from a blaming to a learning environment may be a key strategic advantage in today's health care marketplace.

  10. Risk and Reliability of Infrastructure Asset Management Workshop

    DTIC Science & Technology

    2006-08-01

    of assets within the portfolio for use in Risk and Reliability analysis ... US Army Corps of Engineers assesses its Civil Works infrastructure and applies risk and reliability in the management of that infrastructure. The ... the Corps must complete assessments across its portfolio of major assets before risk management can be used in decision making. Effective risk

  11. The formulary process from a risk management perspective.

    PubMed

    Raber, Jack H

    2010-06-01

    During their evolution over the past 6 decades, hospital formularies have become more than a list of drugs that an institution keeps in stock. Today, an agent under formulary consideration must be examined not only in light of its relative efficacy, safety, and acquisition cost, but consideration must also be given to the potential indirect costs that accompany its use. Federal regulations have, for some drugs, added layers of administrative actions that must be followed to ensure their appropriate use. Examples of this are risk evaluation and mitigation strategies (REMS) and duties that may be implied or expressly addressed in the black-box warnings associated with some classes of agents and, in isolated instances, specific drugs within a given class. Regulatory interpretation of these programs and warnings has often led to the expectation that the institution providing the agent will implement effective protocols and procedures to minimize the risk of adverse events to a patient in addition to or in accordance with required programs such as REMS. The consequences for failing to meet this expectation can lead to regulatory sanctions; the potential also exists for liability exposure. Risk management principles apply to all levels of the decision-making process for evaluating a new agent for formulary inclusion or when reevaluating an agent's formulary status. Pharmacists play an important role in mitigating these risks by carefully evaluating every agent from a broader perspective.

  12. Provider risk factors for medication administration error alerts: analyses of a large-scale closed-loop medication administration system using RFID and barcode.

    PubMed

    Hwang, Yeonsoo; Yoon, Dukyong; Ahn, Eun Kyoung; Hwang, Hee; Park, Rae Woong

    2016-12-01

    To determine the risk factors and rate of medication administration error (MAE) alerts by analyzing large-scale medication administration data and related error logs automatically recorded in a closed-loop medication administration system using radio-frequency identification and barcodes. The subject hospital adopted a closed-loop medication administration system. All medication administrations in the general wards were automatically recorded in real-time using radio-frequency identification, barcodes, and hand-held point-of-care devices. MAE alert logs recorded during a full 1 year of 2012. We evaluated risk factors for MAE alerts including administration time, order type, medication route, the number of medication doses administered, and factors associated with nurse practices by logistic regression analysis. A total of 2 874 539 medication dose records from 30 232 patients (882.6 patient-years) were included in 2012. We identified 35 082 MAE alerts (1.22% of total medication doses). The MAE alerts were significantly related to administration at non-standard time [odds ratio (OR) 1.559, 95% confidence interval (CI) 1.515-1.604], emergency order (OR 1.527, 95%CI 1.464-1.594), and the number of medication doses administered (OR 0.993, 95%CI 0.992-0.993). Medication route, nurse's employment duration, and working schedule were also significantly related. The MAE alert rate was 1.22% over the 1-year observation period in the hospital examined in this study. The MAE alerts were significantly related to administration time, order type, medication route, the number of medication doses administered, nurse's employment duration, and working schedule. The real-time closed-loop medication administration system contributed to improving patient safety by preventing potential MAEs. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  13. Measuring Property Management Risk and Loss: Step One Toward Managing Property on a Foundation of Risk, Cost, and Benefit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Curtis

    1999-05-17

    This is a period of ever-tightening defense budgets and continuing pressure on the public sector to be more commercial-like, Property policies, practices, and regulations are increasingly being challenged and changed. In these times, we must be leaders in understanding and defining the value of our profession from a commercial standpoint so that we can provide the right services to our customers and explain and defend the value of those services. To do so, we must step outside current property management practices, regulations, and oversight. We must learn to think and speak in the language of those who fund us--a financialmore » language of risk, cost, and benefit. Regardless of regulation and oversight, our bosses are demanding that we demonstrate (financially) the benefits of current practice, or else. This article is intended to be the beginning of an effort to understand and define our profession in terms of risk, cost, and benefit so that we can meet these new challenges. The first step in this effort must be defining and measuring risk, cost, and benefit. Our costs, although sometimes difficult to capture, are easy to understand: they are almost exclusively the effort, both within and without the property management organization, involved in managing property. Unfortunately, property risks and benefits are not so simple or so well understood. Generally, risks and benefits are identified and measured through physical inventory results: potential and actual shortages. This paper will explore the weaknesses in the current understanding and use of shortage information as the yardstick for property management risks and performance. It will define a new framework for understanding the purpose and value of property management. And finally, it will set a course for a new method of measuring and valuing physical inventoty shortages. This new method will yield accurate and useful measures of property management risk and benefit. Once risk and benefit are accurately

  14. Clinical risk management in obstetrics.

    PubMed

    Holden, Deborah A; Quin, Maureen; Holden, Des P

    2004-04-01

    Over recent years there has been a growing appreciation that a small but significant proportion of patients experience (sometimes serious) adverse events in the hands of health care workers. Although research in this area is very much in its infancy there has been an increasing move towards applying principles of risk management from industry to health care organizations. With the particularly disastrous and costly nature of adverse outcomes in obstetrics it is appropriate to review clinical risk management issues in maternity. This review explores the appropriateness of applying lessons learned in industry to maternity. The classification of errors into individual and latent, or organizational, is examined. Furthermore, the way in which these errors can be identified and subsequently analysed, with examples from maternity units in the UK and USA, is discussed. The importance of an educational and supportive environment, rather than a blame culture, for both reporting of incidents and learning from adverse outcomes is emphasized. Improvement in patient experience of health care rests not just with improved treatments, but also with a reduction in the adverse events which occur in health care institutions. The principles by which risk can be identified prospectively and retrospectively, and the mechanisms for both local risk management and regional/national reporting and learning are considered.

  15. The impact on the workload of the Ward Manager with the introduction of administrative assistants.

    PubMed

    Locke, Rachel; Leach, Camilla; Kitsell, Fleur; Griffith, Jacki

    2011-03-01

    To evaluate the impact on the workload of the Ward Manager (WM) with the introduction of administrative assistants into eight trusts in the South of England in a year-long pilot. Ward Managers are nurse leaders who are responsible for ward management and delivering expert clinical care to patients. They have traditionally been expected to achieve this role without administrative assistance. Meeting the workload demands of multiple roles and overload has meant the leadership and clinical role has suffered, presenting issues of low morale among existing WMs and issues of recruiting the next generation of WMs. Sixty qualitative interviews were carried out with 16 WMs, 12 Ward Manager Assistants (WMAs), and six senior nurse executives about the impact of the introduction of the WMA post. Quantitative data to measure change in WM workload and ward activity was supplied by 24 wards. Ward Managers reported spending reduced time on administrative tasks and having increased time available to spend on the ward with patients and leading staff. With the introduction of WMAs, there was also improvement in key performance measures (the maintenance of quality under service pressures) and increased staff motivation. There was overwhelming support for the introduction of administrative assistants from participating WMs. The WMAs enabled WMs to spend more time with patients and, more widely, to provide greater support to ward teams. The success of the pilot is reflected in wards working hard to be able to extend contracts of WMAs. The extent of the success is reflected in wards that were not participants in the pilot, observing the benefits of the post, having worked to secure funding to recruit their own WMAs. The widespread introduction of administrative assistance could increase ward productivity and provide support for clinical leaders. Continuing professional development for WMs needs to incorporate training about management responsibilities and how to best use administrative

  16. Supply chain risk management in newspaper company: House of risk approach

    NASA Astrophysics Data System (ADS)

    Ratnasari, Sintya; Hisjam, Muhammad; Sutopo, Wahyudi

    2018-02-01

    In the supply chain (SC) of newspapers, the printing company is the main entity that has several processes, i.e. procure raw materials, print plate and newspapers, and also distribute newspaper to consumers. The existing risks in the newspaper printing company are quite high. A wide range of disturbances or risks needs to be identified to map out the characteristics of the risk sources that will impact on the performance of the supply chain. Therefore, the printing companies need to manage their supply chain risk of the five major SC processes (such as plan, source, deliver, make, and return). In a case study of a newspaper company in Surakarta, the company have not implemented a risk management process that affects the company. This study is aimed to map the risks in the printing company and formulate risk mitigation alternatives to mitigate the risks. The house of risk (HOR) method was chosen to select a set of proactive actions deemed cost-effective in managing SC Risks in the newspaper company. The model consisting of two stages, the first stage (HOR1) was done by identifying risk, risk causing agents and then measured the severity and occurrences to calculate the Aggregate Risk Priority (ARP) value. The second stage (HOR2) is intended to formulate and prioritize the action of mitigation that the company should pursue to reduce the probability of risk agents to occur. The result shows that the innovative model of HOR in Newspaper Company was presented. There are 24 risk events, 20 causing agents and two priority risks in HOR1. The HOR 2 was proposed 9 ranks of mitigation strategy for priority risk agents, from the easiest to the hardest strategy for the company to implement it.

  17. Fatigue Risk Management: A Maritime Framework

    PubMed Central

    Grech, Michelle Rita

    2016-01-01

    It is evident that despite efforts directed at mitigating the risk of fatigue through the adoption of hours of work and rest regulations and development of codes and guidelines, fatigue still remains a concern in shipping. Lack of fatigue management has been identified as a contributory factor in a number of recent accidents. This is further substantiated through research reports with shortfalls highlighted in current fatigue management approaches. These approaches mainly focus on prescriptive hours of work and rest and include an individualistic approach to managing fatigue. The expectation is that seafarers are responsible to manage and tolerate fatigue as part of their working life at sea. This attitude is an accepted part of a seafarer’s role. Poor compliance is one manifest of this problem with shipboard demands making it hard for seafarers to follow hours of work and rest regulations, forcing them into this “poor compliance” trap. This makes current fatigue management approaches ineffective. This paper proposes a risk based approach and way forward for the implementation of a fatigue risk management framework for shipping, aiming to support the hours of work and rest requirements. This forms part of the work currently underway to review and update the International Maritime Organization, Guidelines on Fatigue. PMID:26840326

  18. Fatigue Risk Management: A Maritime Framework.

    PubMed

    Grech, Michelle Rita

    2016-01-29

    It is evident that despite efforts directed at mitigating the risk of fatigue through the adoption of hours of work and rest regulations and development of codes and guidelines, fatigue still remains a concern in shipping. Lack of fatigue management has been identified as a contributory factor in a number of recent accidents. This is further substantiated through research reports with shortfalls highlighted in current fatigue management approaches. These approaches mainly focus on prescriptive hours of work and rest and include an individualistic approach to managing fatigue. The expectation is that seafarers are responsible to manage and tolerate fatigue as part of their working life at sea. This attitude is an accepted part of a seafarer's role. Poor compliance is one manifest of this problem with shipboard demands making it hard for seafarers to follow hours of work and rest regulations, forcing them into this "poor compliance" trap. This makes current fatigue management approaches ineffective. This paper proposes a risk based approach and way forward for the implementation of a fatigue risk management framework for shipping, aiming to support the hours of work and rest requirements. This forms part of the work currently underway to review and update the International Maritime Organization, Guidelines on Fatigue.

  19. Risk Management Certainty Act

    THOMAS, 113th Congress

    Rep. Hudson, Richard [R-NC-8

    2014-01-07

    House - 02/12/2014 Referred to the Subcommittee on General Farm Commodities and Risk Management. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  20. Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success

    NASA Astrophysics Data System (ADS)

    Perera, Jeevan; Holsomback, Jerry D.

    2005-12-01

    Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate

  1. Determination, Verification and Validation of Competencies of Administrative Office Managers.

    ERIC Educational Resources Information Center

    Stallard, John J.; And Others

    1979-01-01

    Survey data compiled from 321 administrative office managers indicated five broad areas of competencies rated as most important: (1) budgeting, (2) employee incentives and relations, (3) standards and job evaluation, (4) human relations and motivation, and (5) recruitment and dismissal. The survey also indicated that more men than women fill…

  2. Managing Smallness: Promising Fiscal Practices for Rural School District Administrators.

    ERIC Educational Resources Information Center

    Freitas, Deborah Inman

    Based on a mail survey of over 100 rural school administrators in 34 states, this handbook outlines common problems and successful strategies in the financial management of rural, small school districts. Major problems are related to revenue and cash flow, increasing expenditures, providing quality education programs, and staffing to handle the…

  3. Load Carriage: An Integrated Risk Management Approach.

    PubMed

    Orr, Robin M; Pope, Rodney R

    2015-11-01

    Military load carriage (LC) gives rise to substantial risks to soldier health, tactical performance, and mission success. The aim of this article was to extract and synthesize the key findings of a series of LC research reports previously published by the authors. Five reviews and 6 studies were included, with key findings extracted and synthesized in tabulated and critical narrative form. The weight of a soldier's load is a source of risk for soldier's injuries and tactical task performance. The resulting level of risk is influenced by risk modifiers (like speed of march, terrain grade, and task type and duration) and risk controls (like administrative controls and physical conditioning). In the Australian context, these risk controls were limited, with soldiers carrying heavier loads than those mandated by doctrine and policy, and LC conditioning not meeting best practice. The diversity of LC contexts, combined with the influence of risk modifiers and risk controls, means that levels of risk associated with LC are not consistent and must be assessed on a case-by-case basis. Load weight and marching routes (terrains, gradients), distances, speed, and duration are all potentially treatable sources of LC-related risk. Potential risk treatments include not only commanders directly addressing these specific sources of risk to the extent feasible, on a case-by-case basis, when planning or conducting LC tasks but also improving administration controls (i.e., doctrine and policies) and personal protection (i.e., the physical conditioning of the soldier) as part of the hierarchy of controls. Practical application would involve commanders developing and implementing dedicated LC doctrine and policies and implementing and enforcing LC conditioning programs that meets best practice.

  4. Risk Management Considerations for Interoperable Acquisition

    DTIC Science & Technology

    2006-08-01

    Electronics Engineers (IEEE) to harmonize the standards for software (IEEE 12207 ) and system (IEEE 15288) life-cycle processes. A goal of this harmonization...management ( ISO /IEC 16085) is being generalized to apply to the systems level. The revised, generalized standard will add require- ments and guidance for the...risk management. The documents include the following: • ISO /IEC Guide 73: Risk Management—Vocabulary—Guidelines for use in stan- dards [ ISO 02

  5. The Maricopa Integrated Risk Assessment Project: A New Way of Looking at Risk

    ERIC Educational Resources Information Center

    Unks, Ruth A.; Thor, Linda

    2008-01-01

    This article reviews the Maricopa Integrated Risk Assessment (MIRA) project and discusses its challenges and successes. Strategies and resources are offered for assisting community college administrators, faculty, and staff to successfully implement enterprise risk management at their institutions.

  6. Comparative Risk Analysis for Metropolitan Solid Waste Management Systems

    NASA Astrophysics Data System (ADS)

    Chang, Ni-Bin; Wang, S. F.

    1996-01-01

    Conventional solid waste management planning usually focuses on economic optimization, in which the related environmental impacts or risks are rarely considered. The purpose of this paper is to illustrate the methodology of how optimization concepts and techniques can be applied to structure and solve risk management problems such that the impacts of air pollution, leachate, traffic congestion, and noise increments can be regulated in the iong-term planning of metropolitan solid waste management systems. Management alternatives are sequentially evaluated by adding several environmental risk control constraints stepwise in an attempt to improve the management strategies and reduce the risk impacts in the long run. Statistics associated with those risk control mechanisms are presented as well. Siting, routing, and financial decision making in such solid waste management systems can also be achieved with respect to various resource limitations and disposal requirements.

  7. Views of Primary School Administrators on Change in Schools and Change Management Practices

    ERIC Educational Resources Information Center

    Hosgörür, Vural

    2016-01-01

    The aim of this study is to determine the opinions of primary school administrators about change, and to reveal which strategies they use to manage change in schools. This is a qualitative study conducted in 2014 academic year in Mugla province. Research data were collected from primary school administrators through semi-structured interviews.…

  8. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  9. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  10. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  11. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  12. Step 7: Choose the "Best" Risk Management Alternative

    USDA-ARS?s Scientific Manuscript database

    The ultimate purpose of the SRM tactical phase is to choose how to manage risk. Prior to this stage, we determined the sources of risk, identified the relevant management actions and estimated the likelihood of all known outcomes. Next, we combine this information with your personal risk preference...

  13. Risk Management and Crisis Response: Are You Prepared?

    ERIC Educational Resources Information Center

    Schirick, Ed

    2002-01-01

    How a camp responds to a crisis may determine whether it can survive financially. Effective risk management requires total commitment from ownership and management, and staff involvement. Steps in formulating a risk management plan include identifying all potential crises and their frequency and severity potential, developing responses,…

  14. Risk Management Model in Surface Exploitation of Mineral Deposits

    NASA Astrophysics Data System (ADS)

    Stojanović, Cvjetko

    2016-06-01

    Risk management is an integrative part of all types of project management. One of the main tasks of pre-investment studies and other project documentation is the tendency to protect investment projects as much as possible against investment risks. Therefore, the provision and regulation of risk information ensure the identification of the probability of the emergence of adverse events, their forms, causes and consequences, and provides a timely measures of protection against risks. This means that risk management involves a set of management methods and techniques used to reduce the possibility of realizing the adverse events and consequences and thus increase the possibilities of achieving the planned results with minimal losses. Investment in mining projects are of capital importance because they are very complex projects, therefore being very risky, because of the influence of internal and external factors and limitations arising from the socio-economic environment. Due to the lack of a risk management system, numerous organizations worldwide have suffered significant financial losses. Therefore, it is necessary for any organization to establish a risk management system as a structural element of system management system as a whole. This paper presents an approach to a Risk management model in the project of opening a surface coal mine, developed based on studies of extensive scientific literature and personal experiences of the author, and which, with certain modifications, may find use for any investment project, both in the mining industry as well as in investment projects in other areas.

  15. Collaborations in leadership: the nurse case management and nursing administration connection.

    PubMed

    Carr, Dana Deravin

    2009-01-01

    With a multiple decade's long surge in managed care and the growth of case management as a profession, there is increasing recognition of the leadership role that case managers employ daily as they coordinate and facilitate patient-centered initiatives. Now, more than ever, case managers are being called upon to further expand their leadership capabilities and take a more active role in professional partnering to ensure the continued attainment of clinical, fiscal, and quality outcomes. All settings, particularly acute care hospitals and integrated delivery systems. The collaboration between nurse case managers and nursing administration provides a framework for the establishment of a collegial and supportive working relationship: one that is built on the strength of mutual goals, shared leadership abilities, respect, and professional loyalty.

  16. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    PubMed

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  17. The effects of crew resource management on teamwork and safety climate at Veterans Health Administration facilities.

    PubMed

    Schwartz, Miriam E; Welsh, Deborah E; Paull, Douglas E; Knowles, Regina S; DeLeeuw, Lori D; Hemphill, Robin R; Essen, Keith E; Sculli, Gary L

    2017-11-09

    Communication failure is a significant source of adverse events in health care and a leading root cause of sentinel events reported to the Joint Commission. The Veterans Health Administration National Center for Patient Safety established Clinical Team Training (CTT) as a comprehensive program to enhance patient safety and to improve communication and teamwork among health care professionals. CTT is based on techniques used in aviation's Crew Resource Management (CRM) training. The aviation industry has reached a significant safety record in large part related to the culture change generated by CRM and sustained by its recurrent implementation. This article focuses on the improvement of communication, teamwork, and patient safety by utilizing a standardized, CRM-based, interprofessional, immersive training in diverse clinical areas. The Teamwork and Safety Climate Questionnaire was used to evaluate safety climate before and after CTT. The scores for all of the 27 questions on the questionnaire showed an increase from baseline to 12 months, and 11 of those increases were statistically significant. A recurrent training is recommended to maintain the positive outcomes. CTT enhances patient safety and reduces risk of patient harm by improving teamwork and facilitating clear, concise, specific and timely communication among health care professionals. © 2017 American Society for Healthcare Risk Management of the American Hospital Association.

  18. Risking a Debate--Redefining Risk and Risk Management: A New Zealand Case Study.

    ERIC Educational Resources Information Center

    Zink, Robyn; Leberman, Sarah

    2001-01-01

    Interviews with 12 New Zealand outdoor instructors found that they viewed risk as an opportunity to gain something of value, as opposed to losing something of value. Repositioning risk in this manner could allow the debate around adventure education to move away from being dominated by risk management, allowing consideration of adventure…

  19. Improving organisational resilience through enterprise security risk management.

    PubMed

    Petruzzi, John; Loyear, Rachelle

    Enterprise Security Risk Management (ESRM) is a new philosophy and method of managing security programmes through the use of traditional risk principles. As a philosophy and life cycle, ESRM is focused on creating a business partnership between security practitioners and business leaders to more effectively provide protection against security risks in line with acceptable risk tolerances as defined by business asset owners and stakeholders. This paper explores the basics of the ESRM philosophy and life cycle and also shows how embracing the ESRM philosophy and implementing a risk-based security management model in the business organisation can lead to higher levels of organisational resilience as desired by organisation leaders, executives and the board of directors.

  20. Best practice vendor risk management in today's interconnected world.

    PubMed

    Beale, Ian

    2017-01-01

    This paper explains why vendor/third-party risk is so important to all organisations, as well as the principal risks that organisations must consider. It describes the responsibility of management to manage these risks with support from risk experts at the selection phase and through the ongoing relationship. Different sources of information about the management of the key risks and alternative ways of collecting the data are evaluated. The paper concludes by discussing how both customer and supplier organisations benefit from a balanced approach to risk management. The approach described in the paper applies to organisations of all types and sizes and can be applied to varied supply chains. The data and insights are based on research conducted by CEB.

  1. [Bibliografic resources on chemical risk administration and prevention].

    PubMed

    Calera Rubio, Alfonso A; Juan Quilis, Verónica; López Samaniego, Luz M; Caballero Pérez, Pablo; Ronda Pérez, Elena

    2005-01-01

    The documentation produced by public and private institutions in relation to the chemical risk constitutes an essential tool for prevention. The objective of this research is to locate and to revise the documents related to the management of the prevention of chemical risk focus to PYMES in Spain from 1995 to 2004. The methodology carried out for the selection of the bibliographical materials has been the consultation of automated databases and Web pages. 812 documents have been identified. Most corresponds to grey literature. The thematic more frequent has been the security and the most frequent objective of the papers has been the prevention. Most of the documents go to the technical sector. The results suggest that although that there is a great diversity of documents in Spain dedicated to the prevention of chemical risk it seems convenient: 1) to increase their diffusion, 2) to pay attention to the communication of the risks, 3) to investigate and to translate the research in good practice.

  2. Managing risk: clinical decision-making in mental health services.

    PubMed

    Muir-Cochrane, Eimear; Gerace, Adam; Mosel, Krista; O'Kane, Debra; Barkway, Patricia; Curren, David; Oster, Candice

    2011-01-01

    Risk assessment and management is a major component of contemporary mental health practice. Risk assessment in health care exists within contemporary perspectives of management and risk aversive practices in health care. This has led to much discussion about the best approach to assessing possible risks posed by people with mental health problems. In addition, researchers and commentators have expressed concern that clinical practice is being dominated by managerial models of risk management at the expense of meeting the patient's health and social care needs. The purpose of the present study is to investigate the risk assessment practices of a multidisciplinary mental health service. Findings indicate that mental health professionals draw on both managerial and therapeutic approaches to risk management, integrating these approaches into their clinical practice. Rather than being dominated by managerial concerns regarding risk, the participants demonstrate professional autonomy and concern for the needs of their clients.

  3. 12 CFR 615.5135 - Management of interest rate risk.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Management of interest rate risk. 615.5135... agricultural credit bank shall develop and implement an interest rate risk management program as set forth in subpart G of this part. The board of directors shall adopt an interest rate risk management section of an...

  4. 12 CFR 615.5135 - Management of interest rate risk.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Management of interest rate risk. 615.5135... agricultural credit bank shall develop and implement an interest rate risk management program as set forth in subpart G of this part. The board of directors shall adopt an interest rate risk management section of an...

  5. Risk in fire management decisionmaking: techniques and criteria

    Treesearch

    Gail Blatternberger; William F. Hyde; Thomas J. Mills

    1984-01-01

    In the past, decisionmaking in wildland fire management generally has not included a full consideration of the risk and uncertainty that is inherent in evaluating alternatives. Fire management policies in some Federal land management agencies now require risk evaluation. The model for estimating the economic efficiency of fire program alternatives is the minimization...

  6. Ethical and Social Values in Business Administration and Management Studies

    ERIC Educational Resources Information Center

    Ruiz-Lozano, Mercedes; de los Rios-Bergillos, Araceli; Tirado-Valencia, Pilar; Millan-Lara, Salud

    2012-01-01

    The objective of this research was to analyze the impact of the learning process in business administration and management of students' values, through the application of factor analysis to the information obtained in a survey consisting of students in the first and fifth year of studies. The study derived the following conclusions: First,…

  7. [Risk assessment of work-related stress: the case of a public administration].

    PubMed

    Loi, Michela; Bellò, Benedetta; Mattana, Veronica

    2015-01-01

    The paper describes a case study of work related stress assessment in a public administration, based on an objective methodology (Romano, 2009). The Ispes1 forms (2010) have been used to perform the assessment. They have been filled during some focus group in which 45 workers have been involved, divided into 7 homogeneous groups relying on their department, back-office vs front-office typology of work and the office collocation. According to the Grounded Theory perspective, through the content analysis three further risk factors arose, comparing to the Ispesl forms, such as: (a) the quality of communication, (b) the relationship among and with leaders and colleagues, (c) the presence of discriminatory behaviours. Hence, on the basis of the results, mostly for a deeper analysis of work related stress assessment in a public administration, we suggest to consider these further risk factors.

  8. Improving Our Odds: Success through Continuous Risk Management

    NASA Technical Reports Server (NTRS)

    Greenhalgh, Phillip O.

    2009-01-01

    Launching a rocket, running a business, driving to work and even day-to-day living all involve some degree of risk. Risk is ever present yet not always recognized, adequately assessed and appropriately mitigated. Identification, assessment and mitigation of risk are elements of the risk management component of the "continuous improvement" way of life that has become a hallmark of successful and progressive enterprises. While the application of risk management techniques to provide continuous improvement may be detailed and extensive, the philosophy, ideals and tools can be beneficially applied to all situations. Experiences with the use of risk identification, assessment and mitigation techniques for complex systems and processes are described. System safety efforts and tools used to examine potential risks of the Ares I First Stage of NASA s new Constellation Crew Launch Vehicle (CLV) presently being designed are noted as examples. Recommendations from lessons learned are provided for the application of risk management during the development of new systems as well as for the improvement of existing systems. Lessons learned and suggestions given are also examined for applicability to simple systems, uncomplicated processes and routine personal daily tasks. This paper informs the reader of varied uses of risk management efforts and techniques to identify, assess and mitigate risk for improvement of products, success of business, protection of people and enhancement of personal life.

  9. Proposed Performance Measures and Strategies for Implementation of the Fatigue Risk Management Guidelines for Emergency Medical Services.

    PubMed

    Martin-Gill, Christian; Higgins, J Stephen; Van Dongen, Hans P A; Buysse, Daniel J; Thackery, Ronald W; Kupas, Douglas F; Becker, David S; Dean, Bradley E; Lindbeck, George H; Guyette, Francis X; Penner, Josef H; Violanti, John M; Lang, Eddy S; Patterson, P Daniel

    2018-02-15

    Performance measures are a key component of implementation, dissemination, and evaluation of evidence-based guidelines (EBGs). We developed performance measures for Emergency Medical Services (EMS) stakeholders to enable the implementation of guidelines for fatigue risk management in the EMS setting. Panelists associated with the Fatigue in EMS Project, which was supported by the National Highway Traffic Safety Administration (NHTSA), used an iterative process to develop a draft set of performance measures linked to 5 recommendations for fatigue risk management in EMS. We used a cross-sectional survey design and the Content Validity Index (CVI) to quantify agreement among panelists on the wording and content of draft measures. An anonymous web-based tool was used to solicit the panelists' perceptions of clarity and relevance of draft measures. Panelists rated the clarity and relevance separately for each draft measure on a 4-point scale. CVI scores ≥0.78 for clarity and relevance were specified a priori to signify agreement and completion of measurement development. Panelists judged 5 performance measures for fatigue risk management as clear and relevant. These measures address use of fatigue and/or sleepiness survey instruments, optimal duration of shifts, access to caffeine as a fatigue countermeasure, use of napping during shift work, and the delivery of education and training on fatigue risk management for EMS personnel. Panelists complemented performance measures with suggestions for implementation by EMS agencies. Performance measures for fatigue risk management in the EMS setting will facilitate the implementation and evaluation of the EBG for Fatigue in EMS.

  10. Improving risk prediction accuracy for new soldiers in the U.S. Army by adding self-report survey data to administrative data.

    PubMed

    Bernecker, Samantha L; Rosellini, Anthony J; Nock, Matthew K; Chiu, Wai Tat; Gutierrez, Peter M; Hwang, Irving; Joiner, Thomas E; Naifeh, James A; Sampson, Nancy A; Zaslavsky, Alan M; Stein, Murray B; Ursano, Robert J; Kessler, Ronald C

    2018-04-03

    High rates of mental disorders, suicidality, and interpersonal violence early in the military career have raised interest in implementing preventive interventions with high-risk new enlistees. The Army Study to Assess Risk and Resilience in Servicemembers (STARRS) developed risk-targeting systems for these outcomes based on machine learning methods using administrative data predictors. However, administrative data omit many risk factors, raising the question whether risk targeting could be improved by adding self-report survey data to prediction models. If so, the Army may gain from routinely administering surveys that assess additional risk factors. The STARRS New Soldier Survey was administered to 21,790 Regular Army soldiers who agreed to have survey data linked to administrative records. As reported previously, machine learning models using administrative data as predictors found that small proportions of high-risk soldiers accounted for high proportions of negative outcomes. Other machine learning models using self-report survey data as predictors were developed previously for three of these outcomes: major physical violence and sexual violence perpetration among men and sexual violence victimization among women. Here we examined the extent to which this survey information increases prediction accuracy, over models based solely on administrative data, for those three outcomes. We used discrete-time survival analysis to estimate a series of models predicting first occurrence, assessing how model fit improved and concentration of risk increased when adding the predicted risk score based on survey data to the predicted risk score based on administrative data. The addition of survey data improved prediction significantly for all outcomes. In the most extreme case, the percentage of reported sexual violence victimization among the 5% of female soldiers with highest predicted risk increased from 17.5% using only administrative predictors to 29.4% adding survey

  11. Advances in management of low-risk febrile neutropenia.

    PubMed

    Teuffel, Oliver; Sung, Lillian

    2012-02-01

    To describe and discuss the most recent advances in the management of low-risk febrile neutropenia in children with cancer. Several risk stratification tools for children with febrile neutropenia have been developed, although none of these tools have been directly compared and few have been validated in independent populations. However, there is good evidence that, for pediatric patients with febrile neutropenia at low risk for severe infection, outpatient management is a well tolerated and efficacious alternative to inpatient care. Moreover, major progress has been made in obtaining and understanding perceived quality of life and preferences for outpatient management in pediatric cancer patients. Many parents prefer inpatient management although child quality of life is, in general, anticipated to be higher with outpatient intravenous therapy. Finally, outpatient strategies are more cost-effective as compared with traditional management in hospital. Outpatient management is a well tolerated and cost-effective strategy for low-risk febrile neutropenia in children with cancer, although parental preferences are highly variable for outpatient versus inpatient management. Future research should examine the effectiveness of outpatient strategies through conduct of large cohort studies. Other future work could focus on development of decision aids and other tools to facilitate ambulatory approaches.

  12. Risk Management Plan Rule

    EPA Pesticide Factsheets

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  13. Risk preferences, probability weighting, and strategy tradeoffs in wildfire management

    Treesearch

    Michael S. Hand; Matthew J. Wibbenmeyer; Dave Calkin; Matthew P. Thompson

    2015-01-01

    Wildfires present a complex applied risk management environment, but relatively little attention has been paid to behavioral and cognitive responses to risk among public agency wildfire managers. This study investigates responses to risk, including probability weighting and risk aversion, in a wildfire management context using a survey-based experiment administered to...

  14. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    NASA Astrophysics Data System (ADS)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored

  15. IT in Educational Administration and Management. CET Information Sheet No. 9.

    ERIC Educational Resources Information Center

    Monaco, Jenny; MacDonald, Lesley

    This document provides information on the use of information technology (IT) to assist in educational management and administration, considers where future developments may lead, and provides definitions of IT and its elements--information handling, communications technology, and information transformation. The involvement of the Council for…

  16. PSALM for Empowering Educational Stakeholders: Participatory School Administration, Leadership and Management

    ERIC Educational Resources Information Center

    San Antonio, Diosdado M.; Gamage, David T.

    2007-01-01

    Purpose: The paper aims to examine the effect of implementing participatory school administration, leadership and management (PSALM) on the levels of empowerment among the educational stakeholders. Design/methodology/approach: A mixed method approach, combining the experimental design with empirical surveys, interviews and documentary analysis,…

  17. Risk Preferences, Probability Weighting, and Strategy Tradeoffs in Wildfire Management.

    PubMed

    Hand, Michael S; Wibbenmeyer, Matthew J; Calkin, David E; Thompson, Matthew P

    2015-10-01

    Wildfires present a complex applied risk management environment, but relatively little attention has been paid to behavioral and cognitive responses to risk among public agency wildfire managers. This study investigates responses to risk, including probability weighting and risk aversion, in a wildfire management context using a survey-based experiment administered to federal wildfire managers. Respondents were presented with a multiattribute lottery-choice experiment where each lottery is defined by three outcome attributes: expenditures for fire suppression, damage to private property, and exposure of firefighters to the risk of aviation-related fatalities. Respondents choose one of two strategies, each of which includes "good" (low cost/low damage) and "bad" (high cost/high damage) outcomes that occur with varying probabilities. The choice task also incorporates an information framing experiment to test whether information about fatality risk to firefighters alters managers' responses to risk. Results suggest that managers exhibit risk aversion and nonlinear probability weighting, which can result in choices that do not minimize expected expenditures, property damage, or firefighter exposure. Information framing tends to result in choices that reduce the risk of aviation fatalities, but exacerbates nonlinear probability weighting. © 2015 Society for Risk Analysis.

  18. Application of Total Quality Management (TQM) in Secondary School Administration in Umuahia Education Zone

    ERIC Educational Resources Information Center

    Ejionueme, L. K.; Oyoyo, Anthonia Oluchi

    2015-01-01

    The study was conducted to investigate the application of Total Quality Management (TQM) in secondary school administration in Umuahia Education Zone. Three research questions and one null hypothesis guided the study. Descriptive survey design was employed for the study. The population of the study comprised 1365 administrators. Multi-stage…

  19. The risk management professional and medication safety.

    PubMed

    Cohen, Hedy; Tuohy, Nancy; Carroll, Roberta

    2009-01-01

    ASHRM is committed to the future development of the healthcare risk management profession. A key contribution to this commitment is the creation of a student version of ASHRM's best-selling Risk Management Handbook for Healthcare Organizations. The Student Edition was released this spring. It is now being made available to universities and colleges to incorporate into their degree programs.

  20. RISK MANAGEMENT EVALUATION FOR CONCENTRATED ANIMAL FEEDING OPERATIONS

    EPA Science Inventory

    The National Risk Management Research Laboratory (NRMRL) developed a Risk Management Evaluation (RME) to provide information needed to help plan future research in the Laboratory dealing with the environmental impact of concentrated animal feeding operations (CAFOs). Agriculture...

  1. Major Management Challenges and Program Risks. Department of Education

    DTIC Science & Technology

    2001-01-01

    GAO United States General Accounting Office Performance and Accountability SeriesJanuary 2001 Major Management Challenges and Program Risks ...34) Title and Subtitle Major Management Challenges and Program Risks Department of Education Contract or Grant Number Program Element Number Authors...Accountability Series: Major Management Challenges and Program Risks . In that series, GAO advised the Congress that it planned to reassess the

  2. Fukushima nuclear power plant accident and comprehensive health risk management-global radiocontamination and information disaster.

    PubMed

    Yamashita, Shunichi

    2014-06-01

    The Great East Japan Earthquake on March 11, 2011, besides further studying the appropriateness of the initial response and post-countermeasures against the severe Fukushima nuclear accident, has now increased the importance of the epidemiological study in comprehensive health risk management and radiation protection; lessons learnt from the Chernobyl accident should be also implemented. Therefore, since May 2011, Fukushima Prefecture has started the "Fukushima Health Management Survey Project" for the purpose of long-term health care administration and early diagnosis/treatment for the prefectural residents. Basic survey is under investigation on a retrospective estimation of external exposure of the first four months. As one of the four detailed surveys, the thyroid ultrasound examination has clarified the increased detection rate of childhood thyroid cancers as a screening effect in the past three years and so thyroid cancer occurrence by Fukushima nuclear power plant accident, especially due to radioactive iodine will be discussed despite of difficult challenge of accurate estimation of low dose and low-dose rate radiation exposures. Through the on-site valuable experience and a difficult challenge for recovery, we should learn the lessons from this severe and large-scale nuclear accident, especially how to countermeasure against public health emergency at the standpoint of health risk and also social risk management.

  3. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of publication. SUMMARY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  4. 77 FR 55505 - Office of the Assistant Secretary for Administration and Management; Agency Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... Management. Type of Review: Extension without change of a currently approved collection. Title of Collection... DEPARTMENT OF LABOR Office of the Assistant Secretary for Administration and Management; Agency Information Collection Activities; Extension Without Change; Comment Request; DOL Generic Solution for...

  5. Managing the unmanageable: risk assessment and risk management in contemporary professional practice.

    PubMed

    Raven, J; Rix, P

    1999-07-01

    This study sets out to investigate the theories and practices of risk assessment and management in the context of contemporary mental health practice. Although risk assessment and management policies are well established for those working in the field of community mental health care, there are noticeable anomalies and regional variations, in the criteria, procedures and decision-making strategies used. Focus group taped interviews were conducted with over 100 mental health professionals in one NHS Trust. These were compared with an extensive literature review on the topic. The main theme to emerge was lack of resources, which included time and staff in the context of a changing and increasing workload. Another important theme was the lack of access to centralized and accurate information about mental health service provision. It is essential that professionals, clients, their families and the public feel confident in professional judgements and practices to avoid a 'back to the asylum' lobby, for the care and treatment of seriously mentally ill individuals.

  6. Derivation and Validation of the Surgical Site Infections Risk Model Using Health Administrative Data.

    PubMed

    van Walraven, Carl; Jackson, Timothy D; Daneman, Nick

    2016-04-01

    OBJECTIVE Surgical site infections (SSIs) are common hospital-acquired infections. Tracking SSIs is important to monitor their incidence, and this process requires primary data collection. In this study, we derived and validated a method using health administrative data to predict the probability that a person who had surgery would develop an SSI within 30 days. METHODS All patients enrolled in the National Surgical Quality Improvement Program (NSQIP) from 2 sites were linked to population-based administrative datasets in Ontario, Canada. We derived a multivariate model, stratified by surgical specialty, to determine the independent association of SSI status with patient and hospitalization covariates as well as physician claim codes. This SSI risk model was validated in 2 cohorts. RESULTS The derivation cohort included 5,359 patients with a 30-day SSI incidence of 6.0% (n=118). The SSI risk model predicted the probability that a person had an SSI based on 7 covariates: index hospitalization diagnostic score; physician claims score; emergency visit diagnostic score; operation duration; surgical service; and potential SSI codes. More than 90% of patients had predicted SSI risks lower than 10%. In the derivation group, model discrimination and calibration was excellent (C statistic, 0.912; Hosmer-Lemeshow [H-L] statistic, P=.47). In the 2 validation groups, performance decreased slightly (C statistics, 0.853 and 0.812; H-L statistics, 26.4 [P=.0009] and 8.0 [P=.42]), but low-risk patients were accurately identified. CONCLUSION Health administrative data can effectively identify postoperative patients with a very low risk of surgical site infection within 30 days of their procedure. Records of higher-risk patients can be reviewed to confirm SSI status.

  7. Development and implementation of a business continuity management risk index.

    PubMed

    Kadar, Michael

    This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels.

  8. Integrating physical and financial approaches to manage environmental financial risk

    NASA Astrophysics Data System (ADS)

    Characklis, Gregory; Meyer, Eliot; Foster, Benjamin

    2017-04-01

    Physical and/or engineered solutions have long been used to manage risks associated with adverse environmental events. Examples include reservoirs as a tool for mitigating drought-related supply risk, levees for managing flood risk and dredging of inland waterways to ensure navigability during low flow periods. These measures can reduce many types of risk (e.g., loss of life), but are often employed as a means of protecting against financial losses. When the focus is on managing environmental financial risk, physical solutions can be effective, but also costly. In many cases, non-physical tools can provide a less expensive means of managing financial risk, with these often taking the form of financial instruments such as hedging contracts, contingency funds or insurance. Some of these instruments, such as flood insurance, are widely available, but historically many environmental financial risks have been managed primarily (or solely) via physical solutions without much consideration of alternatives, thereby opening opportunities for innovation in developing financial solutions. Recent research has demonstrated that financial instruments can play a significant role in managing drought-related financial risk in sectors as diverse as water utilities, energy generation and inland navigation. Nonetheless, this work has largely considered the use of these instruments within systems in which physical solutions are already in place (but failing to achieve desired performance). The next step in the evolution of managing environmental financial risk involves developing methods for designing risk management strategies that do not assume an established physical system. Here the goal is to identify the relative role that physical solutions and financial instruments should play as they are integrated into a comprehensive risk management strategy. This is not a straightforward challenge as one approach reduces the risk of financial losses and the other redistributes those losses

  9. CKD screening and management in the Veterans Health Administration: the impact of system organization and an innovative electronic record.

    PubMed

    Patel, Thakor G; Pogach, Leonard M; Barth, Robert H

    2009-03-01

    At the beginning of this decade, Healthy People 2010 issued a series of objectives to "reduce the incidence, morbidity, mortality and health care costs of chronic kidney disease." A necessary feature of any program to reduce the burden of kidney disease in the US population must include mechanisms to screen populations at risk and institute early the aspects of management, such as control of blood pressure, management of diabetes, and, in patients with advanced chronic kidney disease (CKD), preparation for dialysis therapy and proper vascular access management, that can retard CKD progression and improve long-term outcome. The Department of Veterans Affairs and the Veterans Health Administration is a broad-based national health care system that is almost uniquely situated to address these issues and has developed a number of effective approaches using evidence-based clinical practice guidelines, performance measures, innovative use of a robust electronic medical record system, and system oversight during the past decade. In this report, we describe the application of this systems approach to the prevention of CKD in veterans through the treatment of risk factors, identification of CKD in veterans, and oversight of predialysis and dialysis care. The lessons learned and applicability to the private sector are discussed.

  10. Risk managers, physicians, and disclosure of harmful medical errors.

    PubMed

    Loren, David J; Garbutt, Jane; Dunagan, W Claiborne; Bommarito, Kerry M; Ebers, Alison G; Levinson, Wendy; Waterman, Amy D; Fraser, Victoria J; Summy, Elizabeth A; Gallagher, Thomas H

    2010-03-01

    Physicians are encouraged to disclose medical errors to patients, which often requires close collaboration between physicians and risk managers. An anonymous national survey of 2,988 healthcare facility-based risk managers was conducted between November 2004 and March 2005, and results were compared with those of a previous survey (conducted between July 2003 and March 2004) of 1,311 medical physicians in Washington and Missouri. Both surveys included an error-disclosure scenario for an obvious and a less obvious error with scripted response options. More risk managers than physicians were aware that an error-reporting system was present at their hospital (81% versus 39%, p < .001) and believed that mechanisms to inform physicians about errors in their hospital were adequate (51% versus 17%, p < .001). More risk managers than physicians strongly agreed that serious errors should be disclosed to patients (70% versus 49%, p < .001). Across both error scenario, risk managers were more likely than physicians to definitely recommend that the error be disclosed (76% versus 50%, p < .001) and to provide full details about how the error would be prevented in the future (62% versus 51%, p < .001). However, physicians were more likely than risk managers to provide a full apology recognizing the harm caused by the error (39% versus 21%, p < .001). Risk managers have more favorable attitudes about disclosing errors to patients compared with physicians but are less supportive of providing a full apology. These differences may create conflicts between risk managers and physicians regarding disclosure. Health care institutions should promote greater collaboration between these two key participants in disclosure conversations.

  11. OVERVIEW OF THE INTRAMURAL RISK MANAGEMENT RESEARCH PROGRAM

    EPA Science Inventory

    This presentation will provide a summary of the risk management portion of ORD's endocrine disrupting chemicals (EDCs) research program, including its motivation, goals, planning efforts and resulting research areas.

    In an emerging research area like EDCs, risk management ...

  12. "It's All about Standardisation"--Exploring the Digital (Re)Configuration of School Management and Administration

    ERIC Educational Resources Information Center

    Selwyn, Neil

    2011-01-01

    Schools have long made use of digital technologies to support the co-ordination of management and administrative processes--not least "management information systems", "virtual learning environments" and other "institutional technologies". The last five years have seen the convergence of these technologies into…

  13. Tank waste remediation system tank waste retrieval risk management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  14. Applying risk management strategies to strengthen an IDS's investment policy.

    PubMed

    Fine, R P

    1998-11-01

    The increased financial risk that not-for-profit integrated delivery systems have assumed to function under managed care has required them to become increasingly reliant on income and gains from their investment portfolios. This reliance underscores the need for these organizations to take steps to effectively manage their investment risk. Not-for-profit IDSs should establish a systematic approach to investment risk management that is based on maintaining a sound fiduciary infrastructure and having a clear understanding of risk exposures, the most important of which are policy and market risk. Applying reasonable and common-sense risk management strategies to investment policy will enhance an IDS's overall financial and competitive strength.

  15. RiskLab - a joint Teaching Lab on Hazard and Risk Management

    NASA Astrophysics Data System (ADS)

    Baruffini, Mi.; Baruffini, Mo.; Thuering, M.

    2009-04-01

    In the future natural disasters are expected to increase due to climatic changes that strongly affect environmental, social and economical systems. For this reason and because of the limited resources, governments require analytical risk analysis for a better mitigation planning. Risk analysis is a process to determine the nature and extent of risk by estimating potential hazards and evaluating existing conditions of vulnerability that could pose a potential threat or harm to people, property, livelihoods and environment. This process has become a generally accepted approach for the assessment of cost-benefit scenarios; originating from technical risks it is being applied to natural hazards for several years now in Switzerland. Starting from these premises "Risk Lab", a joint collaboration between the Institute of Earth Sciences of the University of Applied Sciences of Southern Switzerland and the Institute for Economic Research of the University of Lugano, has been started in 2006, aiming to become a competence centre about Risk Analysis and Evaluation. The main issue studied by the lab concerns the topic "What security at what price?" and the activities follow the philosophy of the integral risk management as proposed by PLANAT, that defines the process as a cycle that contains different and interrelated phases. The final aim is to change the population and technician idea about risk from "defending against danger" to "being aware of risks" through a proper academic course specially addressed to young people. In fact the most important activity of the laboratory consists in a degree course, offered both to Engineering and Architecture students of the University of Applied Sciences of Southern Switzerland and Economy Students of the University of Lugano. The course is structured in two main parts: an introductive, theoretical part, composed by class lessons, where the main aspects of natural hazards, risk perception and evaluation and risk management are presented

  16. The application of risk management in sport.

    PubMed

    Fuller, Colin; Drawer, Scott

    2004-01-01

    The process of risk management can be implemented as part of a best practice management system within the sport and leisure sector. The process enables risk factors that might lead to injuries to be identified and the levels of risk associated with activities to be estimated and evaluated. This information can be utilised proactively by sports governing bodies and participants to identify preventive and therapeutic interventions in order to reduce the frequency of occurrence and/or severity of injuries within their sports. The acceptability of risk within specific sports, however, is dependent on the perceptions of the participants involved. Copyright 2004 Adis Data Information BV

  17. Navigator program risk management

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Padilla, Deborah A.

    2004-01-01

    In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

  18. Bow-tie diagrams for risk management in anaesthesia.

    PubMed

    Culwick, M D; Merry, A F; Clarke, D M; Taraporewalla, K J; Gibbs, N M

    2016-11-01

    Bow-tie analysis is a risk analysis and management tool that has been readily adopted into routine practice in many high reliability industries such as engineering, aviation and emergency services. However, it has received little exposure so far in healthcare. Nevertheless, its simplicity, versatility, and pictorial display may have benefits for the analysis of a range of healthcare risks, including complex and multiple risks and their interactions. Bow-tie diagrams are a combination of a fault tree and an event tree, which when combined take the shape of a bow tie. Central to bow-tie methodology is the concept of an undesired or 'Top Event', which occurs if a hazard progresses past all prevention controls. Top Events may also occasionally occur idiosyncratically. Irrespective of the cause of a Top Event, mitigation and recovery controls may influence the outcome. Hence the relationship of hazard to outcome can be viewed in one diagram along with possible causal sequences or accident trajectories. Potential uses for bow-tie diagrams in anaesthesia risk management include improved understanding of anaesthesia hazards and risks, pre-emptive identification of absent or inadequate hazard controls, investigation of clinical incidents, teaching anaesthesia risk management, and demonstrating risk management strategies to third parties when required.

  19. Risk-trading in flood management: An economic model.

    PubMed

    Chang, Chiung Ting

    2017-09-15

    Although flood management is no longer exclusively a topic of engineering, flood mitigation continues to be associated with hard engineering options. Flood adaptation or the capacity to adapt to flood risk, as well as a demand for internalizing externalities caused by flood risk between regions, complicate flood management activities. Even though integrated river basin management has long been recommended to resolve the above issues, it has proven difficult to apply widely, and sometimes even to bring into existence. This article explores how internalization of externalities as well as the realization of integrated river basin management can be encouraged via the use of a market-based approach, namely a flood risk trading program. In addition to maintaining efficiency of optimal resource allocation, a flood risk trading program may also provide a more equitable distribution of benefits by facilitating decentralization. This article employs a graphical analysis to show how flood risk trading can be implemented to encourage mitigation measures that increase infiltration and storage capacity. A theoretical model is presented to demonstrate the economic conditions necessary for flood risk trading. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. 76 FR 3697 - Risk Management Requirements for Derivatives Clearing Organizations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    .... Risk Management Requirements Core Principle D, as amended by the Dodd-Frank Act,\\27\\ requires each DCO... Part II Commodity Futures Trading Commission 17 CFR Part 39 Risk Management Requirements for... RIN 3038-AC98 Risk Management Requirements for Derivatives Clearing Organizations AGENCY: Commodity...

  1. Dream project: Applications of earth observations to disaster risk management

    NASA Astrophysics Data System (ADS)

    Dyke, G.; Gill, S.; Davies, R.; Betorz, F.; Andalsvik, Y.; Cackler, J.; Dos Santos, W.; Dunlop, K.; Ferreira, I.; Kebe, F.; Lamboglia, E.; Matsubara, Y.; Nikolaidis, V.; Ostoja-Starzewski, S.; Sakita, M.; Verstappen, N.

    2011-01-01

    The field of disaster risk management is relatively new and takes a structured approach to managing uncertainty related to the threat of natural and man-made disasters. Disaster risk management consists primarily of risk assessment and the development of strategies to mitigate disaster risk. This paper will discuss how increasing both Earth observation data and information technology capabilities can contribute to disaster risk management, particularly in Belize. The paper presents the results and recommendations of a project conducted by an international and interdisciplinary team of experts at the 2009 session of the International Space University in NASA Ames Research Center (California, USA). The aim is to explore the combination of current, planned and potential space-aided, airborne, and ground-based Earth observation tools, the emergence of powerful new web-based and mobile data management tools, and how this combination can support and improve the emerging field of disaster risk management. The starting point of the project was the World Bank's Comprehensive Approach to Probabilistic Risk Assessment (CAPRA) program, focused in Central America. This program was used as a test bed to analyze current space technologies used in risk management and develop new strategies and tools to be applied in other regions around the world.

  2. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  3. Assessing and Managing Risk with Suicidal Individuals

    ERIC Educational Resources Information Center

    Linehan, Marsh M.; Comtois, Katherine A.; Ward-Ciesielski, Erin F.

    2012-01-01

    The University of Washington Risk Assessment Protocol (UWRAP) and Risk Assessment and Management Protocol (UWRAMP) have been used in numerous clinical trials treating high-risk suicidal individuals over several years. These protocols structure assessors and treatment providers to provide a thorough suicide risk assessment, review standards of care…

  4. 17 CFR 23.609 - Clearing member risk management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... management. 23.609 Section 23.609 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION... Clearing member risk management. (a) With respect to clearing activities in futures, security futures...) Monitor for adherence to the risk-based limits intra-day and overnight; (4) Conduct stress tests under...

  5. 17 CFR 23.609 - Clearing member risk management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... management. 23.609 Section 23.609 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION... Clearing member risk management. (a) With respect to clearing activities in futures, security futures...) Monitor for adherence to the risk-based limits intra-day and overnight; (4) Conduct stress tests under...

  6. Imaging X-Ray Polarimetry Explorer (IXPE) Risk Management

    NASA Technical Reports Server (NTRS)

    Alexander, Cheryl; Deininger, William D.; Baggett, Randy; Primo, Attina; Bowen, Mike; Cowart, Chris; Del Monte, Ettore; Ingram, Lindsey; Kalinowski, William; Kelley, Anthony; hide

    2018-01-01

    The Imaging X-ray Polarimetry Explorer (IXPE) project is an international collaboration to build and fly a polarization sensitive X-ray observatory. The IXPE Observatory consists of the spacecraft and payload. The payload is composed of three X-ray telescopes, each consisting of a mirror module optical assembly and a polarization-sensitive X-ray detector assembly; a deployable boom maintains the focal length between the optical assemblies and the detectors. The goal of the IXPE Mission is to provide new information about the origins of cosmic X-rays and their interactions with matter and gravity as they travel through space. IXPE will do this by exploiting its unique capability to measure the polarization of X-rays emitted by cosmic sources. The collaboration for IXPE involves national and international partners during design, fabrication, assembly, integration, test, and operations. The full collaboration includes NASA Marshall Space Flight Center (MSFC), Ball Aerospace, the Italian Space Agency (ASI), the Italian Institute of Astrophysics and Space Planetology (IAPS)/Italian National Institute of Astrophysics (INAF), the Italian National Institute for Nuclear Physics (INFN), the University of Colorado (CU) Laboratory for Atmospheric and Space Physics (LASP), Stanford University, McGill University, and the Massachusetts Institute of Technology. The goal of this paper is to discuss risk management as it applies to the IXPE project. The full IXPE Team participates in risk management providing both unique challenges and advantages for project risk management. Risk management is being employed in all phases of the IXPE Project, but is particularly important during planning and initial execution-the current phase of the IXPE Project. The discussion will address IXPE risk strategies and responsibilities, along with the IXPE management process which includes risk identification, risk assessment, risk response, and risk monitoring, control, and reporting.

  7. 12 CFR 652.15 - Interest rate risk management and requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Interest rate risk management and requirements... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.15 Interest rate risk... (direction, controls, and supervision) to the interest rate risk management program and must be knowledgeable...

  8. 12 CFR 652.15 - Interest rate risk management and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Interest rate risk management and requirements... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.15 Interest rate risk... (direction, controls, and supervision) to the interest rate risk management program and must be knowledgeable...

  9. Minimizing human error in radiopharmaceutical preparation and administration via a bar code-enhanced nuclear pharmacy management system.

    PubMed

    Hakala, John L; Hung, Joseph C; Mosman, Elton A

    2012-09-01

    The objective of this project was to ensure correct radiopharmaceutical administration through the use of a bar code system that links patient and drug profiles with on-site information management systems. This new combined system would minimize the amount of manual human manipulation, which has proven to be a primary source of error. The most common reason for dosing errors is improper patient identification when a dose is obtained from the nuclear pharmacy or when a dose is administered. A standardized electronic transfer of information from radiopharmaceutical preparation to injection will further reduce the risk of misadministration. Value stream maps showing the flow of the patient dose information, as well as potential points of human error, were developed. Next, a future-state map was created that included proposed corrections for the most common critical sites of error. Transitioning the current process to the future state will require solutions that address these sites. To optimize the future-state process, a bar code system that links the on-site radiology management system with the nuclear pharmacy management system was proposed. A bar-coded wristband connects the patient directly to the electronic information systems. The bar code-enhanced process linking the patient dose with the electronic information reduces the number of crucial points for human error and provides a framework to ensure that the prepared dose reaches the correct patient. Although the proposed flowchart is designed for a site with an in-house central nuclear pharmacy, much of the framework could be applied by nuclear medicine facilities using unit doses. An electronic connection between information management systems to allow the tracking of a radiopharmaceutical from preparation to administration can be a useful tool in preventing the mistakes that are an unfortunate reality for any facility.

  10. The Troll HSE Risk Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiig, E.; Berthelsen, I.; Donovan, K.

    1996-12-31

    The Petroleum Act and Internal Control regulations in Norway lay down requirements for how HSE shall be Managed and documented. To comply with the Norwegian legislation the Troll Project has developed an HSE Risk Management System (RMS) structured around Hazards and Effects Management. The resulting quality, technical and operating integrity, and HSE performance are an endorsement of the power of RMS.

  11. Training Manual for Human Service Risk Managers. Final Report.

    ERIC Educational Resources Information Center

    Davis, Frank W.; And Others

    This manual is designed to educate human service agency management personnel involved in transportation about basic risk management principles and insurance issues. Chapter I illustrates the liability factors that create the insurance and risk management needs. Both legal and humanitarian obligations of human service agencies involved in…

  12. Confluence and Contours: Reflexive Management of Environmental Risk.

    PubMed

    Soane, Emma; Schubert, Iljana; Pollard, Simon; Rocks, Sophie; Black, Edgar

    2016-06-01

    Government institutions have responsibilities to distribute risk management funds meaningfully and to be accountable for their choices. We took a macro-level sociological approach to understanding the role of government in managing environmental risks, and insights from micro-level psychology to examine individual-level risk-related perceptions and beliefs. Survey data from 2,068 U.K. citizens showed that lay people's funding preferences were associated positively with beliefs about responsibility and trust, yet associations with perception varied depending on risk type. Moreover, there were risk-specific differences in the funding preferences of the lay sample and 29 policymakers. A laboratory-based study of 109 participants examined funding allocation in more detail through iterative presentation of expert information. Quantitative and qualitative data revealed a meso-level framework comprising three types of decisionmakers who varied in their willingness to change funding allocation preferences following expert information: adaptors, responders, and resistors. This research highlights the relevance of integrated theoretical approaches to understanding the policy process, and the benefits of reflexive dialogue to managing environmental risks. © 2015 Society for Risk Analysis.

  13. Risk, Issues and Lessons Learned: Maximizing Risk Management in the DoD Ground Domain

    DTIC Science & Technology

    2011-10-01

    Carnegie Mellon University “Risk Management Overview for TACOM” Benefits of Risk Management include: • Risk is a proactive approach - preventing... Chili (no beans) 13 • Hot dog sub-assy Unclassified How does the FMEA work? Execute the analysis and discover the potential failures and effects...34 - --· . -· A c u i.rition Benefits of FMEAs • Prevent major risks, reduce failures, minimize cost and reduce development time - Do it right the first time

  14. Assessing and managing multiple risks in a changing world-The Roskilde recommendations.

    PubMed

    Selck, Henriette; Adamsen, Peter B; Backhaus, Thomas; Banta, Gary T; Bruce, Peter K H; Burton, G Allen; Butts, Michael B; Boegh, Eva; Clague, John J; Dinh, Khuong V; Doorn, Neelke; Gunnarsson, Jonas S; Hauggaard-Nielsen, Henrik; Hazlerigg, Charles; Hunka, Agnieszka D; Jensen, John; Lin, Yan; Loureiro, Susana; Miraglia, Simona; Munns, Wayne R; Nadim, Farrokh; Palmqvist, Annemette; Rämö, Robert A; Seaby, Lauren P; Syberg, Kristian; Tangaa, Stine R; Thit, Amalie; Windfeld, Ronja; Zalewski, Maciej; Chapman, Peter M

    2017-01-01

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk-Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological context for assessments in human-modified systems; 8) assess risks and benefits to humans and the ecosystem and consider unintended consequences of management actions; 9) avoid excessive conservatism or possible underprotection resulting from sole reliance on binary, numerical benchmarks; and 10) develop adaptive risk-management and regulatory goals based on ranges of uncertainty. Environ Toxicol Chem 2017;36:7-16. © 2016 SETAC. © 2016 SETAC.

  15. Major Management Challenges and Program Risks. Department of State

    DTIC Science & Technology

    2001-01-01

    Major Management Challenges and Program Risks Department of StateGAO-01-252 Form SF298 Citation Data Report Date ("DD MON YYYY") 00JAN2001 Report...Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Department of State Contract or...special series, first issued in January 1999, entitled the Performance and Accountability Series: Major Management Challenges and Program Risks . In

  16. Li-Fraumeni syndrome: cancer risk assessment and clinical management.

    PubMed

    McBride, Kate A; Ballinger, Mandy L; Killick, Emma; Kirk, Judy; Tattersall, Martin H N; Eeles, Rosalind A; Thomas, David M; Mitchell, Gillian

    2014-05-01

    Carriers of germline mutations in the TP53 gene, encoding the cell-cycle regulator and tumour suppressor p53, have a markedly increased risk of cancer-related morbidity and mortality during both childhood and adulthood, and thus require appropriate and effective cancer risk management. However, the predisposition of such patients to multiorgan tumorigenesis presents a specific challenge for cancer risk management programmes. Herein, we review the clinical implications of germline mutations in TP53 and the evidence for cancer screening and prevention strategies in individuals carrying such mutations, as well as examining the potential psychosocial implications of lifelong management for a ubiquitous cancer risk. In addition, we propose an evidence-based framework for the clinical management of TP53 mutation carriers and provide a platform for addressing the management of other cancer predisposition syndromes that can affect multiple organs.

  17. RISK MANAGEMENT RESEARCH PLAN FOR WET WEATHER FLOWS

    EPA Science Inventory

    This plan was prepared by the National Risk Management Research Laboratory (NRMRL) of EPA's Office of Research and Development (ORD) to guide the risk management aspects of the urban wet weather flow (WWF) research for the next five years. There are three types of urban WWF dis...

  18. Managing Corporate Risk through Better Knowledge Management

    ERIC Educational Resources Information Center

    Neef, Dale

    2005-01-01

    Purpose: To explain how progressive companies are using a combination of knowledge and risk management (KRM) systems and techniques in order to help them to prevent, or respond most effectively to, ethical or reputation-damaging incidents. Design/methodology/approach: The paper explains KRM, develops a corporate integrity framework, and then…

  19. 12 CFR 615.5181 - Bank interest rate risk management program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit Bank...

  20. 12 CFR 615.5180 - Bank interest rate risk management program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 7 2014-01-01 2014-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5180 Bank interest rate risk management program. (a) The board of directors of each Farm Credit bank...

  1. 12 CFR 615.5181 - Bank interest rate risk management program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit Bank...

  2. Nurse-led clinics for atrial fibrillation: managing risk factors.

    PubMed

    Jacob, Liril

    2017-12-14

    Atrial fibrillation (AF) is the most common and sustained cardiac arrhythmia rated by cardiologists as one of the most difficult conditions to manage. Traditionally, AF management has focused on the three pillars of rate control, rhythm control and anticoagulation. However, more recently, cardiovascular risk-factor management in AF has emerged as a fourth and essential pillar, delivering improved patient outcomes. In the UK, AF is a condition that is often managed poorly, with patients reporting a lack of understanding of their condition and treatment options. Many aspects of assessment and communication in AF management are time consuming. Failure to address those aspects may negatively affect the quality of care. Nurse-led clinics can contribute significantly in the areas of patient education and sustained follow-up care, improving outcomes and addressing current deficiencies in AF risk-factor management due to scarcity of medical resources. This article discusses the major cardiovascular risk factors associated with AF, drawing on evidence from the literature, and considers the effectiveness and implications for practice of introducing community-based nurse-led clinics for risk-factor management in patients with AF.

  3. Application of a risk management system to improve drinking water safety.

    PubMed

    Jayaratne, Asoka

    2008-12-01

    The use of a comprehensive risk management framework is considered a very effective means of managing water quality risks. There are many risk-based systems available to water utilities such as ISO 9001 and Hazard Analysis and Critical Control Point (HACCP). In 2004, the World Health Organization's (WHO) Guidelines for Drinking Water Quality recommended the use of preventive risk management approaches to manage water quality risks. This paper describes the framework adopted by Yarra Valley Water for the development of its Drinking Water Quality Risk Management Plan incorporating HACCP and ISO 9001 systems and demonstrates benefits of Water Safety Plans such as HACCP. Copyright IWA Publishing 2008.

  4. Translating Theory into Practice: Implications of Japanese Management Theory for Student Personnel Administrators. NASPA Monograph Series Volume 3. First Edition.

    ERIC Educational Resources Information Center

    Deegan, William L.; And Others

    Japanese management theory was studied to identify specific models for consideration by student personnel administrators. The report is organized into three sections: major components of Japanese management theory, potential implications for student personnel administration, and three models, based on components of Japanese management theory, for…

  5. Cardiovascular risk management in rheumatoid arthritis patients still suboptimal: the Implementation of Cardiovascular Risk Management in Rheumatoid Arthritis project.

    PubMed

    van den Oever, Inge A M; Heslinga, Maaike; Griep, Ed N; Griep-Wentink, Hanneke R M; Schotsman, Rob; Cambach, Walter; Dijkmans, Ben A C; Smulders, Yvo M; Lems, Willem F; Boers, Maarten; Voskuyl, Alexandre E; Peters, Mike J L; van Schaardenburg, Dirkjan; Nurmohamed, Micheal T

    2017-09-01

    To assess the 10-year cardiovascular (CV) risk score and to identify treatment and undertreatment of CV risk factors in patients with established RA. Demographics, CV risk factors and prevalence of cardiovascular disease (CVD) were assessed by questionnaire. To calculate the 10-year CV risk score according to the Dutch CV risk management guideline, systolic blood pressure was measured and cholesterol levels were determined from fasting blood samples. Patients were categorized into four groups: indication for treatment but not treated; inadequately treated, so not meeting goals (systolic blood pressure ⩽140 mmHg and/or low-density lipoprotein ⩽2.5 mmol/l); adequately treated; or no treatment necessary. A total of 720 consecutive RA patients were included, 375 from Reade and 345 from the Antonius Hospital. The mean age of patients was 59 years (s.d. 12) and 73% were female. Seventeen per cent of the patients had a low 10-year CV risk (<10%), 21% had an intermediate risk (10-19%), 53% a high risk (⩾20%) and 9% had CVD. In total, 69% had an indication for preventive treatment (cholesterol-lowering or antihypertensive drugs). Of those, 42% received inadequate treatment and 40% received no treatment at all. Optimal CV risk management remains a major challenge and better awareness and management are urgently needed to reduce the high risk of CVD in the RA population. © The Author 2017. Published by Oxford University Press on behalf of the British Society for Rheumatology. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  6. An operations-partnered evaluation of care redesign for high-risk patients in the Veterans Health Administration (VHA): Study protocol for the PACT Intensive Management (PIM) randomized quality improvement evaluation.

    PubMed

    Chang, Evelyn T; Zulman, Donna M; Asch, Steven M; Stockdale, Susan E; Yoon, Jean; Ong, Michael K; Lee, Martin; Simon, Alissa; Atkins, David; Schectman, Gordon; Kirsh, Susan R; Rubenstein, Lisa V

    2018-06-01

    Patient-centered medical homes have made great strides providing comprehensive care for patients with chronic conditions, but may not provide sufficient support for patients at highest risk for acute care use. To address this, the Veterans Health Administration (VHA) initiated a five-site demonstration project to evaluate the effectiveness of augmenting the VA's Patient Aligned Care Team (PACT) medical home with PACT Intensive Management (PIM) teams for Veterans at highest risk for hospitalization. Researchers partnered with VHA leadership to design a mixed-methods prospective multi-site evaluation that met leadership's desire for a rigorous evaluation conducted as quality improvement rather than research. We conducted a randomized QI evaluation and assigned high-risk patients to participate in PIM and compared them with high-risk Veterans receiving usual care through PACT. The summative evaluation examines whether PIM: 1) decreases VHA emergency department and hospital use; 2) increases satisfaction with VHA care; 3) decreases provider burnout; and 4) generates positive returns on investment. The formative evaluation aims to support improved care for high-risk patients at demonstration sites and to inform future initiatives for high-risk patients. The evaluation was reviewed by representatives from the VHA Office of Research and Development and the Office of Research Oversight and met criteria for quality improvement. VHA aims to function as a learning organization by rapidly implementing and rigorously testing QI innovations prior to final program or policy development. We observed challenges and opportunities in designing an evaluation consistent with QI standards and operations priorities, while also maintaining scientific rigor. This trial was retrospectively registered at ClinicalTrials.gov on April 3, 2017: NCT03100526. Protocol v1, FY14-17. Copyright © 2018 Elsevier Inc. All rights reserved.

  7. A Comparison of Academic Administrators and Enrollment Managers' Perceptions of Undergraduate Enrollment Management Functions at a Subset of Four-Year Public Institutions

    ERIC Educational Resources Information Center

    Cesarini, Lisa McHugh

    2011-01-01

    The purpose of this study was to examine perceptions of various enrollment management functions at a subset of four-year public institutions. Specifically, this study compared perceptions of academic administrators with enrollment managers as they related to the availability, need, and effectiveness of certain enrollment management functions. In…

  8. Potential impact of single-risk-factor versus total risk management for the prevention of cardiovascular events in Seychelles.

    PubMed

    Ndindjock, Roger; Gedeon, Jude; Mendis, Shanthi; Paccaud, Fred; Bovet, Pascal

    2011-04-01

    To assess the prevalence of cardiovascular (CV) risk factors in Seychelles, a middle-income African country, and compare the cost-effectiveness of single-risk-factor management (treating individuals with arterial blood pressure ≥ 140/90 mmHg and/or total serum cholesterol ≥ 6.2 mmol/l) with that of management based on total CV risk (treating individuals with a total CV risk ≥ 10% or ≥ 20%). CV risk factor prevalence and a CV risk prediction chart for Africa were used to estimate the 10-year risk of suffering a fatal or non-fatal CV event among individuals aged 40-64 years. These figures were used to compare single-risk-factor management with total risk management in terms of the number of people requiring treatment to avert one CV event and the number of events potentially averted over 10 years. Treatment for patients with high total CV risk (≥ 20%) was assumed to consist of a fixed-dose combination of several drugs (polypill). Cost analyses were limited to medication. A total CV risk of ≥ 10% and ≥ 20% was found among 10.8% and 5.1% of individuals, respectively. With single-risk-factor management, 60% of adults would need to be treated and 157 cardiovascular events per 100000 population would be averted per year, as opposed to 5% of adults and 92 events with total CV risk management. Management based on high total CV risk optimizes the balance between the number requiring treatment and the number of CV events averted. Total CV risk management is much more cost-effective than single-risk-factor management. These findings are relevant for all countries, but especially for those economically and demographically similar to Seychelles.

  9. Potential impact of single-risk-factor versus total risk management for the prevention of cardiovascular events in Seychelles

    PubMed Central

    Ndindjock, Roger; Gedeon, Jude; Mendis, Shanthi; Paccaud, Fred

    2011-01-01

    Abstract Objective To assess the prevalence of cardiovascular (CV) risk factors in Seychelles, a middle-income African country, and compare the cost-effectiveness of single-risk-factor management (treating individuals with arterial blood pressure ≥ 140/90 mmHg and/or total serum cholesterol ≥ 6.2 mmol/l) with that of management based on total CV risk (treating individuals with a total CV risk ≥ 10% or ≥ 20%). Methods CV risk factor prevalence and a CV risk prediction chart for Africa were used to estimate the 10-year risk of suffering a fatal or non-fatal CV event among individuals aged 40–64 years. These figures were used to compare single-risk-factor management with total risk management in terms of the number of people requiring treatment to avert one CV event and the number of events potentially averted over 10 years. Treatment for patients with high total CV risk (≥ 20%) was assumed to consist of a fixed-dose combination of several drugs (polypill). Cost analyses were limited to medication. Findings A total CV risk of ≥ 10% and ≥ 20% was found among 10.8% and 5.1% of individuals, respectively. With single-risk-factor management, 60% of adults would need to be treated and 157 cardiovascular events per 100 000 population would be averted per year, as opposed to 5% of adults and 92 events with total CV risk management. Management based on high total CV risk optimizes the balance between the number requiring treatment and the number of CV events averted. Conclusion Total CV risk management is much more cost-effective than single-risk-factor management. These findings are relevant for all countries, but especially for those economically and demographically similar to Seychelles. PMID:21479093

  10. College & University Business Administration. Third Edition.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    This text presents indepth coverage of five areas of college and university business administration, including administrative management, business management, fiscal management, and financial accounting and reporting. The section on administrative management encompasses institutional planning, management information systems and data processing,…

  11. Risk assessment and risk management of mycotoxins.

    PubMed

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  12. Effective Management of Special Education Programs. A Handbook for School Administrators.

    ERIC Educational Resources Information Center

    Osborne, Allan G., Jr.; And Others

    This book is intended to guide school administrators through the day-to-day supervision of the special education program and to serve as a resource for handling problem situations that may arise. The first of the book's six chapters provides basic information on program management, including standards of compliance with state and federal…

  13. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  14. New Tools and Methods for Assessing Risk-Management Strategies

    DTIC Science & Technology

    2004-03-01

    Theories to evaluate the risks and benefits of various acquisition alternatives and allowed researchers to monitor the process students used to make a...revealed distinct risk-management strategies. 15. SUBJECT TERMS risk managements, acquisition process, expected value theory , multi-attribute utility theory ...Utility Theories to evaluate the risks and benefits of various acquisition alternatives, and allowed us to monitor the process subjects used to arrive at

  15. Imagining flood futures: risk assessment and management in practice.

    PubMed

    Lane, Stuart N; Landström, Catharina; Whatmore, Sarah J

    2011-05-13

    The mantra that policy and management should be 'evidence-based' is well established. Less so are the implications that follow from 'evidence' being predictions of the future (forecasts, scenarios, horizons) even though such futures define the actions taken today to make the future sustainable. Here, we consider the tension between 'evidence', reliable because it is observed, and predictions of the future, unobservable in conventional terms. For flood risk management in England and Wales, we show that futures are actively constituted, and so imagined, through 'suites of practices' entwining policy, management and scientific analysis. Management has to constrain analysis because of the many ways in which flood futures can be constructed, but also because of commitment to an accounting calculus, which requires risk to be expressed in monetary terms. It is grounded in numerical simulation, undertaken by scientific consultants who follow policy/management guidelines that define the futures to be considered. Historical evidence is needed to deal with process and parameter uncertainties and the futures imagined are tied to pasts experienced. Reliance on past events is a challenge for prediction, given changing probability (e.g. climate change) and consequence (e.g. development on floodplains). So, risk management allows some elements of risk analysis to become unstable (notably in relation to climate change) but forces others to remain stable (e.g. invoking regulation to prevent inappropriate floodplain development). We conclude that the assumed separation of risk assessment and management is false because the risk calculation has to be defined by management. Making this process accountable requires openness about the procedures that make flood risk analysis more (or less) reliable to those we entrust to produce and act upon them such that, unlike the 'pseudosciences', they can be put to the test of public interrogation by those who have to live with their consequences

  16. Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

    NASA Technical Reports Server (NTRS)

    Witkowski, Mona M.

    2002-01-01

    A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully

  17. Essentials of Risk Management. Strategic Decisions. Board Basics.

    ERIC Educational Resources Information Center

    Sonenstein, Burton; Kumin, Laura A.

    1998-01-01

    This booklet, intended for trustees of institutions of higher education, offers some instruction on the principles of risk management. Introductory information provides a definition of risk management, which is seen as a planning and strategic function, not solely as a financial or safety assessment. Individual sections then address the following…

  18. Risk of Acute Kidney Injury After Intravenous Contrast Media Administration.

    PubMed

    Hinson, Jeremiah S; Ehmann, Michael R; Fine, Derek M; Fishman, Elliot K; Toerper, Matthew F; Rothman, Richard E; Klein, Eili Y

    2017-05-01

    The study objective was to determine whether intravenous contrast administration for computed tomography (CT) is independently associated with increased risk for acute kidney injury and adverse clinical outcomes. This single-center retrospective cohort analysis was performed in a large, urban, academic emergency department with an average census of 62,179 visits per year; 17,934 ED visits for patients who underwent contrast-enhanced, unenhanced, or no CT during a 5-year period (2009 to 2014) were included. The intervention was CT scan with or without intravenous contrast administration. The primary outcome was incidence of acute kidney injury. Secondary outcomes included new chronic kidney disease, dialysis, and renal transplantation at 6 months. Logistic regression modeling and between-groups odds ratios with and without propensity-score matching were used to test for an independent association between contrast administration and primary and secondary outcomes. Treatment decisions, including administration of contrast and intravenous fluids, were examined. Rates of acute kidney injury were similar among all groups. Contrast administration was not associated with increased incidence of acute kidney injury (contrast-induced nephropathy criteria odds ratio=0.96, 95% confidence interval 0.85 to 1.08; and Acute Kidney Injury Network/Kidney Disease Improving Global Outcomes criteria odds ratio=1.00, 95% confidence interval 0.87 to 1.16). This was true in all subgroup analyses regardless of baseline renal function and whether comparisons were made directly or after propensity matching. Contrast administration was not associated with increased incidence of chronic kidney disease, dialysis, or renal transplant at 6 months. Clinicians were less likely to prescribe contrast to patients with decreased renal function and more likely to prescribe intravenous fluids if contrast was administered. In the largest well-controlled study of acute kidney injury following contrast

  19. The US Food and Drug Administration's Risk Evaluation and Mitigation Strategy (REMS) Program - Current Status and Future Direction.

    PubMed

    Wu, Jasmanda; Juhaeri, Juhaeri

    2016-12-01

    The US Food and Drug Administration (FDA) Amendments Act of 2007 granted the FDA new authorities to enhance drug safety by requiring application holders to submit a proposed Risk Evaluation and Mitigation Strategy (REMS). A REMS is a required risk management plan that uses tools beyond the package insert. REMS elements may include a medication guide and patient package insert for patients and a communication plan focused on health care professionals. Elements to assure safe use (ETASUs) are put in place to mitigate a specific known serious risk when other less restrictive elements of a REMS are not sufficient to mitigate such risk. An implementation system is required for an REMS that includes the ETASUs. With approximately eight years of experience with REMS programs, many health care settings have created systems to manage REMS and also to integrate REMS into their practice settings. At the same time, there are issues associated with the development and implementation of REMS. In 2011, FDA created the REMS Integration Initiative to develop guidance on how to apply statutory criteria to determine when a REMS is required, to improve standardization and assessment of REMS, and to improve integration of REMS into the existing healthcare system. A key component of the REMS Integration Initiative is stakeholder outreach to better understand how existing REMS programs are working and to identify opportunities for improvement. This review attempts to share our company's experience with the REMS program, and to provide updates on FDA's efforts to improve REMS communication, to standardize REMS process, to reduce REMS program burdens and to build a common REMS platform. Copyright © 2016 Elsevier HS Journals, Inc. All rights reserved.

  20. Female Administrative Managers in Australian Universities: Not Male and Not Academic

    ERIC Educational Resources Information Center

    Wallace, Michelle; Marchant, Teresa

    2011-01-01

    Women make up 65 per cent of the staff in Australian universities who do not perform academic work. While there is a growing body of research on women in senior management and the experiences of female academics in Australian universities, there is less literature on women working in the administrative stream, especially those in middle…

  1. Equipment management risk rating system based on engineering endpoints.

    PubMed

    James, P J

    1999-01-01

    The equipment management risk ratings system outlined here offers two significant departures from current practice: risk classifications are based on intrinsic device risks, and the risk rating system is based on engineering endpoints. Intrinsic device risks are categorized as physical, clinical and technical, and these flow from the incoming equipment assessment process. Engineering risk management is based on verification of engineering endpoints such as clinical measurements or energy delivery. This practice eliminates the ambiguity associated with ranking risk in terms of physiologic and higher-level outcome endpoints such as no significant hazards, low significance, injury, or mortality.

  2. Multicriteria Decision Framework for Cybersecurity Risk Assessment and Management.

    PubMed

    Ganin, Alexander A; Quach, Phuoc; Panwar, Mahesh; Collier, Zachary A; Keisler, Jeffrey M; Marchese, Dayton; Linkov, Igor

    2017-09-05

    Risk assessors and managers face many difficult challenges related to novel cyber systems. Among these challenges are the constantly changing nature of cyber systems caused by technical advances, their distribution across the physical, information, and sociocognitive domains, and the complex network structures often including thousands of nodes. Here, we review probabilistic and risk-based decision-making techniques applied to cyber systems and conclude that existing approaches typically do not address all components of the risk assessment triplet (threat, vulnerability, consequence) and lack the ability to integrate across multiple domains of cyber systems to provide guidance for enhancing cybersecurity. We present a decision-analysis-based approach that quantifies threat, vulnerability, and consequences through a set of criteria designed to assess the overall utility of cybersecurity management alternatives. The proposed framework bridges the gap between risk assessment and risk management, allowing an analyst to ensure a structured and transparent process of selecting risk management alternatives. The use of this technique is illustrated for a hypothetical, but realistic, case study exemplifying the process of evaluating and ranking five cybersecurity enhancement strategies. The approach presented does not necessarily eliminate biases and subjectivity necessary for selecting countermeasures, but provides justifiable methods for selecting risk management actions consistent with stakeholder and decisionmaker values and technical data. Published 2017. This article is a U.S. Government work and is in the public domain in the U.S.A.

  3. Disaster Risk Management and Measurement Indicators for Cultural Heritage in Taiwan

    NASA Astrophysics Data System (ADS)

    Yen, Y. N.; Cheng, C. F.; Cheng, H. M.

    2015-08-01

    Under the influence of global climate change, the risk preparedness has become a universal issue in different research fields. In the conservation of cultural heritage, disaster risk management is becoming one of the major research topics. Besides researches on the theory and mechanism of disaster risk management, the tools for the performance of site managers to protect cultural heritage is another important issue that needs development. UNESCO and ICOMOS have released some important documents on disaster risk management including its concept, identification, evaluation, mitigation, monitoring and resilience, etc. However, there is a big gap between concept and implementation in Taiwan. Presently there are 2000 monuments in Taiwan that hardly meet the modern code. First, based on international documents released, this research presents 13 disaster indicators on monuments and their environments. Next, 345 monuments in northern Taiwan are taken as examples to evaluate their risk situations with indicators designed in 2011. Some positive recommendations were given at the same time. As a result, a comparative evaluation was completed in 2012 and some key issues are found, such as too many electrical facilities, lack of efficient firefighting equipment, and a shortage of management mechanism, just to name a few. Through the improvement of the management, some major risk can be mitigated. In 2013~14, this research took 23 national monuments from the 345 monuments to evaluate their risk situations and compare the differences between national and local monuments. Results show that almost all management mechanisms in the national monuments have been established and are running well. However, problems like inappropriate electrical facilities and insufficient monitoring equipment remain. In addition, the performance of private monuments is not as good as public ones. Based on the collected information and evaluation, this research develops safety measures of heritage

  4. Risk factors, health risks, and risk management for aircraft personnel and frequent flyers.

    PubMed

    Kim, Jeoum Nam; Lee, Byung Mu

    2007-01-01

    Health risks associated with long periods of time in flight are of concern to astronauts, crew members, and passengers. Many epidemiological studies showed that occupational and frequent flyers may be susceptible to ocular, cardiovascular, neurological, pulmonary, gastrointestinal, sensory, immunological, physiological, and even developmental disorders. In addition, the incidences of cancer and food poisoning are expected to be higher in such individuals. This article reviews health risks and risk factors associated with air travel, and discusses risk management strategies. To reduce adverse health risks, risk factors such as radiation, infection, stress, temperature, pressure, and circadian rhythm need to be avoided or reduced to levels that are as low as technologically achievable to protect flight personnel and passengers.

  5. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    NASA Astrophysics Data System (ADS)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  6. Pediatric off-label drug use in China: risk factors and management strategies.

    PubMed

    Zhang, Lingli; Li, Youping; Liu, Yi; Zeng, Linan; Hu, Die; Huang, Liang; Chen, Min; Lv, Juan; Yang, Chunsong

    2013-02-01

    To analyze the risk factors of pediatric off-label drug use, and propose management strategies for policy making of the pediatric off-label drug use in China. (i) We applied stratified random sampling to select recipes of children aged 0 to 18 years in pediatric clinics and wards of the West China Second University Hospital in 2010. (ii) All included prescriptions were categorized as off-label use or on-label use, according to the latest package insert licensed by the State Food and Drug Administration. (iii) Risk factors and the weights were calculated using logistic regression. (iv) The correlation between risk factors and the different kinds of off-label prescriptions was presented using adjusted odds ratio, and the impact of the risk factors was measured using standardized partial regression coefficient. (v) SPSS 16.0 was used for statistic analysis. (vi) From the perspective of the medical institutions, pharmaceutical enterprises, professional institutions, and the public, we combined the results of the Evidence-based research on the policy of the off-label drug use in 15 countries and the results of risk factor analysis, in order to propose management strategies for the policy making of pediatric off-label drug use in China. (i) Using the method of sampling, we received 2640 recipes from outpatients and 14,374 prescriptions from 749 inpatients. (ii) The neonates (0 to 27 days) had higher risk in off-label drug use than the other three children age groups. (iii) The dermatological medicines (D), nervous system medicines (N), traditional Chinese medicines, and respiratory drugs (R) were high-risk off-label medicines whose labels should be updated more frequently. (iv) The great factors of off-label drug use are those influence health status and relate to health services (ICD-10:Z00-Z99) (mainly in the clinic of child care and growth development, and in the ward of chemotherapy). (v) Off-label drug use in the ward was 4.4 times than that in clinic service (P < 0

  7. Staff Layoffs and Terminations--Managing the Risks.

    ERIC Educational Resources Information Center

    Michaelson, Martin; White, Lawrence

    This paper reviews legal risks associated with staff layoffs at institutions of higher education and methods for managing those risks and describes planning steps designed to minimize institutional legal exposure. Legal risks include claims of breach of contract, discrimination, tortious conduct, and violation of labor laws, collective bargaining…

  8. Appraising longitudinal trends in the strategic risks cited by risk managers in the international water utility sector, 2005-2015.

    PubMed

    Chalker, Rosemary T C; Pollard, Simon J T; Leinster, Paul; Jude, Simon

    2018-03-15

    We report dynamic changes in the priorities for strategic risks faced by international water utilities over a 10year period, as cited by managers responsible for managing them. A content analysis of interviews with three cohorts of risk managers in the water sector was undertaken. Interviews probed the focus risk managers' were giving to strategic risks within utilities, as well as specific questions on risk analysis tools (2005); risk management cultures (2011) and the integration of risk management with corporate decision-making (2015). The coding frequency of strategic (business, enterprise, corporate) risk terms from 18 structured interviews (2005) and 28 semi-structured interviews (12 in 2011; 16 in 2015) was used to appraise changes in the perceived importance of strategic risks within the sector. The aggregated coding frequency across the study period, and changes in the frequency of strategic risks cited at three interview periods identified infrastructure assets as the most significant risk over the period and suggests an emergence of extrinsic risk over time. Extended interviews with three utility risk managers (2016) from the UK, Canada and the US were then used to contextualise the findings. This research supports the ongoing focus on infrastructure resilience and the increasing prevalence of extrinsic risk within the water sector, as reported by the insurance sector and by water research organisations. The extended interviews provided insight into how strategic risks are now driving the implementation agenda within utilities, and into how utilities can secure tangible business value from proactive risk governance. Strategic external risks affecting the sector are on the rise, involve more players and are less controllable from within a utility's own organisational boundaries. Proportionate risk management processes and structures provide oversight and assurance, whilst allowing a focus on the tangible business value that comes from managing strategic

  9. Mental Health Professionals' Suicide Risk Assessment and Management Practices.

    PubMed

    Roush, Jared F; Brown, Sarah L; Jahn, Danielle R; Mitchell, Sean M; Taylor, Nathanael J; Quinnett, Paul; Ries, Richard

    2018-01-01

    Approximately 20% of suicide decedents have had contact with a mental health professional within 1 month prior to their death, and the majority of mental health professionals have treated suicidal individuals. Despite limited evidence-based training, mental health professionals make important clinical decisions related to suicide risk assessment and management. The current study aimed to determine the frequency of suicide risk assessment and management practices and the association between fear of suicide-related outcomes or comfort working with suicidal individuals and adequacy of suicide risk management decisions among mental health professionals. Mental health professionals completed self-report assessments of fear, comfort, and suicide risk assessment and management practices. Approximately one third of mental health professionals did not ask every patient about current or previous suicidal thoughts or behaviors. Further, comfort, but not fear, was positively associated with greater odds of conducting evidence-based suicide risk assessments at first appointments and adequacy of suicide risk management practices with patients reporting suicide ideation and a recent suicide attempt. The study utilized a cross-sectional design and self-report questionnaires. Although the majority of mental health professionals report using evidenced-based practices, there appears to be variability in utilization of evidence-based practices.

  10. Managing Difficult, Frustrating, and Hostile Conversations: Strategies for Savvy Administrators. Second Edition

    ERIC Educational Resources Information Center

    Kosmoski, Georgia J.; Pollack, Dennis R.

    2005-01-01

    The second edition of this best-selling resource provides new and updated content influenced by the feedback of over 250 school administrators. "Managing Difficult, Frustrating, and Hostile Conversations" uncovers safe and effective strategies for dispelling common sensitive situations such as handling legitimate complaints, controlling those…

  11. Managing perceived operational risk factors for effective supply-chain management

    NASA Astrophysics Data System (ADS)

    Sylla, Cheickna

    2014-12-01

    This research is part of a large scale comprehensive mathematical and empirical modeling investigation projects aimed at developing a better understanding of supply-chain risk management by offering a comprehensive framework including theoretical elements and empirical evidence based on managers' perception of improved organizational level of preparedness to safeguard against the threats of disruptions, delays and stoppage in the supply chain. More specifically, this paper reports the empirical investigation conducted using 92 companies in several eastern USA regions involved in international trades with global supply chains. Among the 56 general hypotheses investigated, the results support that managers strive to balance their control and decision impacts to mold their responses to risk factors with knowledge of the extent of cost consequences as stated in previous research. However, the results also propose new findings which significantly vary from previous research reports.

  12. 78 FR 15019 - Food and Drug Administration Prescription Drug User Fee Act V Benefit-Risk Plan; Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2013-N-0196] Food and Drug Administration Prescription Drug User Fee Act V Benefit-Risk Plan; Request for Comments AGENCY: Food and Drug Administration, HHS. ACTION: Notice, request for comments. SUMMARY: The Food and...

  13. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of public... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  14. Intelligence Support to Supply Chain Risk Management

    DTIC Science & Technology

    2012-06-01

    of Master of Science in Operations Analysis Charles L. Carter, MA Major, USAF June 2012 DISTRIBUTION STATEMENT A. APPROVED FOR...literature regarding supply chain risk management and intelligence doctrine. This review established the importance of supply chain risk analysis to...risk analysis . This research culminated in the development of a methodology for intelligence professionals to use to support supply chain risk

  15. USING BIOASSAYS TO EVALUATE THE PERFORMANCE OF EDC RISK MANAGEMENT METHODS

    EPA Science Inventory

    In Superfund risk management research, the performance of risk management techniques is typically evaluated by measuring "the concentrations of the chemicals of concern before and after risk management efforts. However, using bioassays and chemical data provides a more robust und...

  16. Risk Management Technique for design and operation of facilities and equipment

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.

    1975-01-01

    The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

  17. Periodontal Management by Risk Assessment: A Pragmatic Approach.

    PubMed

    Mullins, Joanna M; Even, Joshua B; White, Joel M

    2016-06-01

    An evidence-based periodontal disease risk assessment and diagnosis system has been developed and combined with a clinical decision support and management program to improve treatment and measure patient outcomes. There is little agreement on a universally accepted periodontal risk assessment, periodontal diagnosis, and treatment management tool and their incorporation into dental practice to improve patient care. This article highlights the development and use of a practical periodontal management and risk assessment program that can be implemented in dental settings. The approach taken by Willamette Dental Group to develop a periodontal disease risk assessment, periodontal diagnosis, and treatment management tool is described using evidence-based best practices. With goals of standardized treatment interventions while maintaining personalized care and improved communication, this process is described to facilitate its incorporation into other dental settings. Current electronic health records can be leveraged to enhance patient-centered care through the use of risk assessments and standardized guidelines to more effectively assess, diagnose, and treat patients to improve outcomes. Dental hygienists, and other committed providers, with their emphasis on prevention of periodontal disease can be principal drivers in creation and implementation of periodontal risk assessments and personalized treatment planning. Willamette Dental Group believes that such evidence-based tools can advance dentistry to new diagnostic and treatment standards. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Impact of Primary Care Intensive Management on High-Risk Veterans' Costs and Utilization: A Randomized Quality Improvement Trial.

    PubMed

    Yoon, Jean; Chang, Evelyn; Rubenstein, Lisa V; Park, Angel; Zulman, Donna M; Stockdale, Susan; Ong, Michael K; Atkins, David; Schectman, Gordon; Asch, Steven M

    2018-06-05

    Primary care models that offer comprehensive, accessible care to all patients may provide insufficient resources to meet the needs of patients with complex conditions who have the greatest risk for hospitalization. To assess whether augmenting usual primary care with team-based intensive management lowers utilization and costs for high-risk patients. Randomized quality improvement trial. (ClinicalTrials.gov: NCT03100526). 5 U.S. Department of Veterans Affairs (VA) medical centers. Primary care patients at high risk for hospitalization who had a recent acute care episode. Locally tailored intensive management programs providing care coordination, goals assessment, health coaching, medication reconciliation, and home visits through an interdisciplinary team, including a physician or nurse practitioner, a nurse, and psychosocial experts. Utilization and costs (including intensive management program expenses) 12 months before and after randomization. 2210 patients were randomly assigned, 1105 to intensive management and 1105 to usual care. Patients had a mean age of 63 years and an average of 7 chronic conditions; 90% were men. Of the patients assigned to intensive management, 487 (44%) received intensive outpatient care (that is, ≥3 encounters in person or by telephone) and 204 (18%) received limited intervention. From the pre- to postrandomization periods, mean inpatient costs decreased more for the intensive management than the usual care group (-$2164 [95% CI, -$7916 to $3587]). Outpatient costs increased more for the intensive management than the usual care group ($2636 [CI, $524 to $4748]), driven by greater use of primary care, home care, telephone care, and telehealth. Mean total costs were similar in the 2 groups before and after randomization. Sites took up to several months to contact eligible patients, limiting the time between treatment and outcome assessment. Only VA costs were assessed. High-risk patients with access to an intensive management program

  19. Online professional networks for physicians: risk management.

    PubMed

    Hyman, Jon L; Luks, Howard J; Sechrest, Randale

    2012-05-01

    The rapidly developing array of online physician-only communities represents a potential extraordinary advance in the availability of educational and informational resources to physicians. These online communities provide physicians with a new range of controls over the information they process, but use of this social media technology carries some risk. The purpose of this review was to help physicians manage the risks of online professional networking and discuss the potential benefits that may come with such networks. This article explores the risks and benefits of physicians engaging in online professional networking with peers and provides suggestions on risk management. Through an Internet search and literature review, we scrutinized available case law, federal regulatory code, and guidelines of conduct from professional organizations and consultants. We reviewed the OrthoMind.com site as a case example because it is currently the only online social network exclusively for orthopaedic surgeons. Existing case law suggests potential liability for orthopaedic surgeons who engage with patients on openly accessible social network platforms. Current society guidelines in both the United States and Britain provide sensible rules that may mitigate such risks. However, the overall lack of a strong body of legal opinions, government regulations as well as practical experience for most surgeons limit the suitability of such platforms. Closed platforms that are restricted to validated orthopaedic surgeons may limit these downside risks and hence allow surgeons to collaborate with one another both as clinicians and practice owners. Educating surgeons about the pros and cons of participating in these networking platforms is helping them more astutely manage risks and optimize benefits. This evolving online environment of professional interaction is one of few precedents, but the application of risk management strategies that physicians use in daily practice carries over

  20. [Biological evaluation within a risk management process].

    PubMed

    Zhuang, Fei; Ding, Biao

    2007-07-01

    Bio-evaluation within the medical device quality/risk management system is a risk analyzing and assessing process. On the basis of data from characterization of materials, scientific literatures, application history, bio-toxicology testing and so on, weighing the benefit and the risk, bio-evaluation does a conclusion to "take" or "quit" the product design. There is no "zero risk" though "no toxicity" always is the most desirable conclusion in a testing report. The application history data is the most comprehensive among the information available, since no testing system can "clone" the human body. In addition, the capital cost has to be taken into account when bringing the sophisticated testing technologies into the evaluating system. Investigating the #G95-1 of FDA CDRH and the changes of ISO 10993-1, the trend to integrate bio-evaluation into a quality/risk management process can be figured out.

  1. Anesthesia patient risk: a quantitative approach to organizational factors and risk management options.

    PubMed

    Paté-Cornell, M E; Lakats, L M; Murphy, D M; Gaba, D M

    1997-08-01

    The risk of death or brain damage to anesthesia patients is relatively low, particularly for healthy patients in modern hospitals. When an accident does occur, its cause is usually an error made by the anesthesiologist, either in triggering the accident sequence, or failing to take timely corrective measures. This paper presents a pilot study which explores the feasibility of extending probabilistic risk analysis (PRA) of anesthesia accidents to assess the effects of human and management components on the patient risk. We develop first a classic PRA model for the patient risk per operation. We then link the probabilities of the different accident types to their root causes using a probabilistic analysis of the performance shaping factors. These factors are described here as the "state of the anesthesiologist" characterized both in terms of alertness and competence. We then analyze the effects of different management factors that affect the state of the anesthesiologist and we compute the risk reduction benefits of several risk management policies. Our data sources include the published version of the Australian Incident Monitoring Study as well as expert opinions. We conclude that patient risk could be reduced substantially by closer supervision of residents, the use of anesthesia simulators both in training and for periodic recertification, and regular medical examinations for all anesthesiologists.

  2. Risk Management Interventions to Reduce Injuries and Maximize Economic Benefits in U.S. Mining.

    PubMed

    Griffin, Stephanie C; Bui, David P; Gowrisankaran, Gautam; Lutz, Eric A; He, Charles; Hu, Chengcheng; Burgess, Jefferey L

    2018-03-01

    Risk management (RM) is a cyclical process of identifying and ranking risks, implementing controls, and evaluating their effectiveness. This study aims to identify effective RM interventions in the U.S. mining industry. RM interventions were identified in four companies representing metal, aggregate, and coal mining sectors. Injury rates were determined using Mine Safety and Health Administration (MSHA) data and changes in injury rates identified through change point analysis. Program implementation costs and associated changes in injury costs were evaluated for select interventions. Six of 20 RM interventions were associated with a decline in all injuries and one with a reduction in lost-time injuries, all with a positive return on investment. Reductions in injuries and associated costs were observed following implementation of a limited number of specific RM interventions.

  3. Risk and risk management for Australian sex workers.

    PubMed

    Harris, Margaret; Nilan, Pam; Kirby, Emma

    2011-03-01

    In this article, we address the experiences of female sex workers in urban Australia through analysis of interviews using a feminist approach. Although many previous studies have been conducted, our focus was on the voices of sex workers in an area that was rapidly gentrifying, leading to local community tensions. Intensive analysis of interview transcripts was employed to derive thematic codes for understanding how the women viewed and managed everyday risk in sex work. They were well aware of the health risks associated with sex work. For women working on premises, domain separation between sex work and other life domains was an important management strategy for maintaining self-esteem. For women working on the street, instincts honed by years of dangerous work provided a measure of safety. Our findings have implications for health and other agencies dealing with sex workers in situations in which community pressure is exerted to move sex workers away from the area.

  4. Assessing Risk Management: How Effective Is Your Program?

    ERIC Educational Resources Information Center

    Murphy, Kelle L.

    2015-01-01

    Injuries may occur more often in physical education due to the nature of the activities taught. Because of this, the issue of negligence is an important concern. Risk management is one method physical educators use to decrease the occurrence of injuries and negligence. The purpose of this article is to introduce a Risk Management Inventory that…

  5. Evaluation of Risk Management Strategies for a Low-Cost, High-Risk Project

    NASA Technical Reports Server (NTRS)

    Shishko, Robert; Jorgensen, Edward J.

    1996-01-01

    This paper summarizes work in progress to define and implement a risk management process tailored to a low-cost, high-risk, NASA mission -the Microrover Flight Experiment (MFEX, commonly called the Mars microrover).

  6. Project risk management in the construction of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  7. Worksite-based cardiovascular risk screening and management: a feasibility study.

    PubMed

    Padwal, Raj; Rashead, Mohammad; Snider, Jonathan; Morrin, Louise; Lehman, Agnes; Campbell, Norm Rc

    2017-01-01

    Established cardiovascular risk factors are highly prevalent and contribute substantially to cardiovascular morbidity and mortality because they remain uncontrolled in many Canadians. Worksite-based cardiovascular risk factor screening and management represent a largely untapped strategy for optimizing risk factor control. In a 2-phase collaborative demonstration project between Alberta Health Services (AHS) and the Alberta Newsprint Company (ANC), ANC employees were offered cardiovascular risk factor screening and management. Screening was performed at the worksite by AHS nurses, who collected baseline history, performed automated blood pressure measurement and point-of-care testing for lipids and A1c, and calculated 10-year Framingham risk. Employees with a Framingham risk score of ≥10% and uncontrolled blood pressure, dyslipidemia, or smoking were offered 6 months of pharmacist case management to optimize their risk factor control. In total, 87 of 190 (46%) employees volunteered to undergo cardiovascular risk factor screening. Mean age was 44.5±11.9 years, 73 (83.9%) were male, 14 (16.1%) had hypertension, 4 (4.6%) had diabetes, 12 (13.8%) were current smokers, and 9 (10%) had dyslipidemia. Of 36 employees with an estimated Framingham risk score of ≥10%, 21 (58%) agreed to receive case management and 15 (42%) attended baseline and 6-month follow-up case management visits. Statistically significant reductions in left arm systolic blood pressure (-8.0±12.4 mmHg; p =0.03) and triglyceride levels (-0.8±1.4 mmol/L; p =0.04) occurred following case management. These findings demonstrate the feasibility and usefulness of collaborative, worksite-based cardiovascular risk factor screening and management. Expansion of this type of partnership in a cost-effective manner is warranted.

  8. USING BIOASSAYS TO EVALUATE THE PERFORMANCE OF RISK MANAGEMENT TECHNIQUES

    EPA Science Inventory

    Often, the performance of risk management techniques is evaluated by measuring the concentrations of the chemials of concern before and after risk management effoprts. However, using bioassays and chemical data provides a more robust understanding of the effectiveness of risk man...

  9. Do risk assessment tools help manage and reduce risk of violence and reoffending? A systematic review.

    PubMed

    Viljoen, Jodi L; Cochrane, Dana M; Jonnson, Melissa R

    2018-06-01

    Although it is widely believed that risk assessment tools can help manage risk of violence and offending, it is unclear what evidence exists to support this view. As such, we conducted a systematic review and narrative synthesis. To identify studies, we searched 13 databases, reviewed reference lists, and contacted experts. Through this review, we identified 73 published and unpublished studies (N = 31,551 psychiatric patients and offenders, N = 10,002 professionals) that examined either professionals' risk management efforts following the use of a tool, or rates of violence or offending following the implementation of a tool. These studies included a variety of populations (e.g., adults, adolescents), tools, and study designs. The primary findings were as follows: (a) despite some promising findings, professionals do not consistently adhere to tools or apply them to guide their risk management efforts; (b) following the use of a tool, match to the risk principle is moderate and match to the needs principle is limited, as many needs remained unaddressed; (c) there is insufficient evidence to conclude that tools directly reduce violence or reoffending, as findings are mixed; and (d) tools appear to have a more beneficial impact on risk management when agencies use careful implementation procedures and provide staff with training and guidelines related to risk management. In sum, although risk assessment tools may be an important starting point, they do not guarantee effective treatment or risk management. However, certain strategies may bolster their utility. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  10. Enterprise Risk Management in the Great City Schools, Spring 2016

    ERIC Educational Resources Information Center

    Clark, Scott B.; DeCato, Kristen Devan; George, Dave; Henderson, Dana; Henry, Aston A., Jr.; Hoch, Christopher

    2016-01-01

    Public schools have a mandate to educate children in a way that is safe, effective, and cost efficient. The risks involved in achieving that mandate have become increasingly complex, and the need to manage those risks has never been greater. The emergence of widespread, interconnected risks, such as cyber risks and data management, infrastructure…

  11. RISK MANAGEMENT RESEARCH PLAN FOR ECOSYSTEM RESTORATION IN WATERSHEDS

    EPA Science Inventory

    This document outlines the scope of National Risk Management Laboratory (NRMRL) risk management research in the area of ecosystem restoration. NRMRL is uniquely positioned to make substantial contributions to ecosystem science because of its in-house expertise relative to surfac...

  12. Risk Management in Construction Project: Taking Fairness into Account

    NASA Astrophysics Data System (ADS)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  13. Clinical risk management in mental health: a qualitative study of main risks and related organizational management practices.

    PubMed

    Briner, Matthias; Manser, Tanja

    2013-02-04

    A scientific understanding of clinical risk management (CRM) in mental health care is essential for building safer health systems and for improving patient safety. While evidence on patient safety and CRM in physical health care has increased, there is limited research on these issues in mental health care. This qualitative study provides an overview of the most important clinical risks in mental health and related organizational management practices. We conducted in-depth expert interviews with professionals responsible for CRM in psychiatric hospitals. Interviews were transcribed and analyzed applying qualitative content analysis to thematically sort the identified risks. The main concerns for CRM in mental health are a) violence and self-destructive behavior (i.e. protecting patients and staff from other patients, and patients from themselves), b) treatment errors, especially in the process of therapy, and c) risks associated with mental illnesses (e.g. psychosis or depression). This study identified critical differences to CRM in hospitals for physical disorder and challenges specific to CRM in mental health. Firstly, many psychiatric patients do not believe that they are ill and are therefore in hospital against their will. Secondly, staff safety is a much more prominent theme for CRM in mental health care as it is directly related to the specifics of mental illnesses. The current study contributes to the understanding of patient safety and raises awareness for CRM in mental health. The mental health specific overview of central risks and related organizational management practices offers a valuable basis for CRM development in mental health and an addition to CRM in general.

  14. Data communication between data terminal equipment and the JPL administrative data base management system

    NASA Technical Reports Server (NTRS)

    Iverson, R. W.

    1984-01-01

    Approaches to enabling an installed base of mixed data terminal equipment to access a data base management system designed to work with a specific terminal are discussed. The approach taken by the Jet Propulsion Laboratory is described. Background information on the Jet Propulsion Laboratory (JPL), its organization and a description of the Administrative Data Base Management System is included.

  15. Bisphenol A and Risk Management Ethics

    PubMed Central

    Resnik, David B.; Elliot, Kevin C.

    2013-01-01

    It is widely recognized that endocrine disrupting compounds, such as Bisphenol A, pose challenges for traditional paradigms in toxicology, insofar as these substances appear to have a wider range of low-dose effects than previously recognized. These compounds also pose challenges for ethics and policymaking. When a chemical does not have significant low-dose effects, regulators can allow it to be introduced into commerce or the environment, provided that procedures and rules are in place to keep exposures below an acceptable level. This option allows society to maximize the benefits from the use of the chemical while minimizing risks to human health or the environment, and it represents a compromise between competing values. When it is not possible to establish acceptable exposure levels for chemicals that pose significant health or environmental risks, the most reasonable options for risk management may be to enact either partial or complete bans on their use. These options create greater moral conflict than other risk management strategies, leaving policymakers difficult choices between competing values. PMID:24471646

  16. Bisphenol A and risk management ethics.

    PubMed

    Resnik, David B; Elliott, Kevin C

    2015-03-01

    It is widely recognized that endocrine disrupting compounds, such as Bisphenol A, pose challenges for traditional paradigms in toxicology, insofar as these substances appear to have a wider range of low-dose effects than previously recognized. These compounds also pose challenges for ethics and policymaking. When a chemical does not have significant low-dose effects, regulators can allow it to be introduced into commerce or the environment, provided that procedures and rules are in place to keep exposures below an acceptable level. This option allows society to maximize the benefits from the use of the chemical while minimizing risks to human health or the environment, and it represents a compromise between competing values. When it is not possible to establish acceptable exposure levels for chemicals that pose significant health or environmental risks, the most reasonable options for risk management may be to enact either partial or complete bans on their use. These options create greater moral conflict than other risk management strategies, leaving policymakers difficult choices between competing values. © 2014 John Wiley & Sons Ltd.

  17. Professional Preparation in Athletic Administration and Sport Management: Undergraduate and Graduate Programs in Canada.

    ERIC Educational Resources Information Center

    Parkhouse, Bonnie L.; Stoy, Christopher J.

    1979-01-01

    Programs in athletic administration and sport management offered by four Canadian institutions are briefly outlined with information including availability of financial aid, degree requirements, and program description. (JMF)

  18. Older adults and high-risk medication administration in the emergency department.

    PubMed

    Kim, Mitchell; Mitchell, Steven H; Gatewood, Medley; Bennett, Katherine A; Sutton, Paul R; Crawford, Carol A; Bentov, Itay; Damodarasamy, Mamatha; Kaplan, Stephen J; Reed, May J

    2017-01-01

    Older adults are susceptible to adverse effects from opioids, nonsteroidal anti-inflammatory drugs (NSAIDs), and benzodiazepines (BZDs). We investigated factors associated with the administration of elevated doses of these medications of interest to older adults (≥65 years old) in the emergency department (ED). ED records were queried for the administration of medications of interest to older adults at two academic medical center EDs over a 6-month period. Frequency of recommended versus elevated ("High doses" were defined as doses that ranged between 1.5 and 3 times higher than the recommended starting doses; "very high doses" were defined as higher than high doses) starting doses of medications, as determined by geriatric pharmacy/medicine guidelines and expert consensus, was compared by age groups (65-69, 70-74, 75-79, 80-84, and ≥85 years), gender, and hospital. There were 17896 visits representing 11374 unique patients >65 years of age (55.3% men, 44.7% women). A total of 3394 doses of medications of interest including 1678 high doses and 684 very high doses were administered to 1364 different patients. Administration of elevated doses of medications was more common than that of recommended doses. Focusing on opioids and BZDs, the 65-69-year age group was much more likely to receive very high doses (1481 and 412 doses, respectively) than the ≥85-year age groups (relative risk [RR] 5.52, 95% CI 2.56-11.90), mainly reflecting elevated opioid dosing (RR 8.28, 95% CI 3.69-18.57). Men were more likely than women to receive very high doses (RR 1.47, 95% CI 1.26-1.72), primarily due to BZDs (RR 2.12, 95% CI 2.07-2.16). Administration of elevated doses of opioids and BZDs in the older population occurs frequently in the ED, especially to the 65-69-year age group and men. Further attention to potentially unsafe dosing of high-risk medications to older adults in the ED is warranted.

  19. Risk Based Framework for Geotechnical Asset Management

    DOT National Transportation Integrated Search

    2017-12-28

    This report presents the outcome from a multi-year research study to incorporate a risk management framework for the Alaska Department of Transportation & Public Facilities Geotechnical Asset Management (GAM) Plan. The GAM Plan was developed by Paul ...

  20. Transportation risk management : international practices for program development and project delivery.

    DOT National Transportation Integrated Search

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  1. Overview of practice management in child and adolescent psychiatry.

    PubMed

    Schreter, Robert K

    2010-01-01

    The manager of a psychiatric practice must create and direct a clinical delivery system, design and oversee the administrative services necessary to support the system, and guide the business operations that contribute to its success. Regardless of the size of the practice, the psychiatrist administrator must handle seven core administrative responsibilities and oversee individual functions and capabilities within each domain. These responsibilities include practice development, clinical services management, medical office operations, clinical management, information management, business management, and risk management. This article provides a roadmap for creating and sustaining successful clinical and administrative endeavors. It can also be used by existing practices as an audit instrument to provide a snapshot of current capabilities so that strengths as well as opportunities for continued growth can be identified.

  2. Intermittent furosemide administration in patients with or at risk for acute kidney injury: Meta-analysis of randomized trials

    PubMed Central

    Bove, Tiziana; Belletti, Alessandro; Putzu, Alessandro; Pappacena, Simone; Denaro, Giuseppe; Bagshaw, Sean M.; Zangrillo, Alberto

    2018-01-01

    Background Furosemide is the most common loop diuretic used worldwide. The off-label administration of furosemide bolus(es) for the prevention or to reverse acute kidney injury (AKI) is widespread but not supported by available evidence. We conducted a meta-analysis of randomized trials (RCTs) to investigate whether bolus furosemide to prevent or treat AKI is detrimental on patients’ survival. Methods Electronic databases were searched through October 2017 for RCTs comparing bolus furosemide administration versus any comparator in patients with or at risk for AKI. The primary endpoint was all-cause longest follow-up mortality. Secondary endpoints included new or worsening AKI, receipt of renal replacement therapy, length of hospital stay, and peak serum creatinine after randomization. Results A total of 28 studies randomizing 3,228 patients were included in the analysis. We found no difference in mortality between the two groups (143/892 [16%] in the furosemide group versus 141/881 [16%] in the control group; odds ratio [OR], 0.84; 95% confidence interval [CI], 0.63 to 1.13; p = 0.25). No significant differences in secondary outcomes were found. A significant improvement in survival was found in the subgroup of patients receiving furosemide bolus(es) as a preventive measure (43/613 [7.0%] versus 67/619 [10.8%], OR 0.62; 95% CI, 0.41 to 0.94; p = 0.03) Conclusions Intermittent furosemide administration is not associated with an increased mortality in patients with or at risk for AKI, although it may reduce mortality when used as a preventive measure. Future high-quality RCTs are needed to define the role of loop diuretics in AKI prevention and management. Trial registration The study protocol was registered on PROSPERO database for systematic reviews (Registration no. CRD42017078607 – http://www.crd.york.ac.uk/PROSPERO/display_record.php?ID=CRD42017078607). PMID:29689116

  3. Managing Suicide Risk in Patients with Schizophrenia

    PubMed Central

    Kasckow, John; Felmet, Kandi; Zisook, Sidney

    2011-01-01

    The management of suicide risk in patients with schizophrenia poses many challenges for clinicians. Compared with the general population, these patients have an 8.5-fold greater risk of suicide. This article reviews the literature dealing with the treatment of at-risk patients with schizophrenia. An integrated psychosocial and pharmacological approach to managing this population of patients is recommended. Although there is at least modest evidence suggesting that antipsychotic medications protect against suicidal risk, the evidence appears to be most favourable for second-generation antipsychotics, particularly clozapine, which is the only medication approved by the US FDA for preventing suicide in patients with schizophrenia. In addition, treating depressive symptoms in patients with schizophrenia is an important component of suicide risk reduction. While selective serotonin receptor inhibitors (SSRIs) ameliorate depressive symptoms in patients with schizophrenia, they also appear to attenuate suicidal thoughts. Further research is needed to more effectively personalize the treatment of suicidal thoughts and behaviours and the prevention of suicide in patients with schizophrenia. PMID:21254789

  4. A phased approach to induced seismicity risk management

    DOE PAGES

    White, Joshua A.; Foxall, William

    2014-01-01

    This work describes strategies for assessing and managing induced seismicity risk during each phase of a carbon storage project. We consider both nuisance and damage potential from induced earthquakes, as well as the indirect risk of enhancing fault leakage pathways. A phased approach to seismicity management is proposed, in which operations are continuously adapted based on available information and an on-going estimate of risk. At each project stage, specific recommendations are made for (a) monitoring and characterization, (b) modeling and analysis, and (c) site operations. The resulting methodology can help lower seismic risk while ensuring site operations remain practical andmore » cost-effective.« less

  5. Educational Leadership, Management and Administration in Africa: An Analysis of Contemporary Literature

    ERIC Educational Resources Information Center

    Asuga, Gladys Nyanchama; Scevak, Jill; Eacott, Scott

    2016-01-01

    Over the past two decades, there have been calls by scholars for a more concerted effort to develop empirically grounded research studies on educational leadership management and administration in an indigenous context rather than hegemonic western contexts. This paper presents a review of contemporary literature on educational leadership from…

  6. Accreditation Surveys: Administrators, Managers & Supervisors, Faculty, and Staff, Spring 2002. Revised. Report.

    ERIC Educational Resources Information Center

    Gribbons, Barry C.; Dixon, P. Scott; Meuschke, Daylene M.

    The Office of Institutional Development and Technology (IDT), in cooperation with regional accreditation committees, surveyed all administrators, managers, supervisors, full-time faculty, and classified staff at the College of the Canyons, California, in spring 2002. The purpose of the survey was to gather information useful to college staff in…

  7. Building Trust among Educational Stakeholders through Participatory School Administration, Leadership and Management

    ERIC Educational Resources Information Center

    San Antonio, Diosdado M.; Gamage, David T.

    2007-01-01

    This paper examines the impact of implementing Participatory School Administration, Leadership and Management (PSALM) on the levels of trust among the educational stakeholders in Philippine public secondary schools. After an introductory section, the research context is provided by briefly reviewing relevant literature on PSALM and on trust and by…

  8. 17 CFR 1.73 - Clearing futures commission merchant risk management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... maintain systems of risk controls reasonably designed to ensure compliance with the limits; (iii) When a... for clearing, it shall establish and maintain systems of risk management controls reasonably designed... maintain systems of risk management controls reasonably designed to ensure compliance with the limits. (v...

  9. 17 CFR 1.73 - Clearing futures commission merchant risk management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... maintain systems of risk controls reasonably designed to ensure compliance with the limits; (iii) When a... for clearing, it shall establish and maintain systems of risk management controls reasonably designed... maintain systems of risk management controls reasonably designed to ensure compliance with the limits. (v...

  10. 76 FR 16587 - Risk Management Requirements for Derivatives Clearing Organizations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 39 RIN 3038-AC98 Risk Management Requirements for... other things, would implement DCO Core Principle D (Risk Management) and would establish a related... framework to reduce risk, increase transparency, and promote market integrity within the financial system...

  11. Risk Management in Australian Science Education: A Model for Practice.

    ERIC Educational Resources Information Center

    Forlin, Peter

    1995-01-01

    Provides a framework that incorporates the diverse elements of risk management in science education into a systematic process and is adaptable to changing circumstances. Appendix contains risk management checklist for management, laboratory and storage, extreme biological and chemical hazards, protective equipment, waste disposal, electrical…

  12. 12 CFR 1710.19 - Compliance and risk management programs; compliance with other laws.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management program. (1) An Enterprise shall establish and maintain a risk management program that is reasonably designed to manage the risks of the operations of the Enterprise. (2) The risk management program... executive officer of the Enterprise. The risk management officer shall report regularly to the board of...

  13. Anger Management for At-Risk Youth.

    ERIC Educational Resources Information Center

    Freeman, John G.; And Others

    This paper focuses on the development of a counseling intervention for use with youth in managing their anger. The anger-management materials described combine elements of a cognitive-behavioral approach with a process orientation to help at-risk youth maintain a career. It is noted that students are taught a strategy for dealing with anger and…

  14. Experience of health-system pharmacy administration residents in a longitudinal human resource management program.

    PubMed

    Amerine, Lindsey B Poppe; Granko, Robert P; Savage, Scott W; Daniels, Rowell; Eckel, Stephen F

    2014-12-15

    The experience of health-system pharmacy administration (HSPA) residents in a longitudinal human resource (HR) management program is described. The subsequent benefits to the residents, department, and profession are also discussed. Postgraduate year 2 HSPA residents at an academic medical center desired more responsibility for managing an operational area. To this end, a program was created in which these residents directly manage a small group of pharmacy technicians and report to a clinical manager or assistant director with oversight responsibility. These "resident managers" are responsible, under the direction of the area's clinical manager, for the personnel, schedule, time and attendance, and HR activities of the area. Resident managers have led and sustained operational improvement projects in their areas. In addition to providing learning experiences to residents, the HSPA residency program has also improved the operations of the areas in which these residents work. Benefits to the residents include conducting annual performance evaluations for employees with whom they have a relationship as it is a task every administrator completes. Resident managers at UNC have consistently stated that this longitudinal HR experience is one of the most rewarding and most challenging experiences offered in the two-year HSPA residency. The involvement of HSPA residents in longitudinal management responsibilities furthers residents' leadership success by providing trained managers who are ready to immerse themselves into practice postresidency, having employee engagement and HR skills as well as experiences with leading operational improvements. A longitudinal HR management experience was successfully incorporated into an HSPA residency combined Master of Science degree program. Copyright © 2014 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  15. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    EPA Pesticide Factsheets

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  16. [Legal and methodical aspects of occupational risk management].

    PubMed

    2011-01-01

    Legal and methodical aspects of occupational risk management (ORM) are considered with account of new official documents. Introduction of risk and risk management notions into Labor Code reflects the change of forms of occupational health and safety. The role of hygienist and occupational medicine professionals in workplace conditions certification (WCC) and periodical medical examinations (PME) is strengthened. The ORM could be improved by introducing the block of prognosis and causation based on IT-technologies that could match systems of WCC and PME thus improving the effectiveness of prophylactics.

  17. Risk assessment and management approaches on mental health units.

    PubMed

    Woods, P

    2013-11-01

    This exploratory and descriptive study took place in one Canadian province. The study aimed to: (1) to identify and describe the nature and extent of current risk assessment and management approaches used in the adult inpatient mental health and forensic units; and (2) to identify good practice and shortfalls in the nature and extent of the approaches currently utilized. Data were collected from 48 participants through nine focus groups. Participants reported that they used a clinical approach to risk assessment. They had also not considered risk assessment and management as a proactive structured process. Education and training was also limited and skills were developed over time through practice. Five keys issues are discussed as important: reliance on clinical judgement alone is not the best choice to make; the need to consider risk as a whole concept; risk management being more reactive than proactive; education and training; and client involvement in risk assessment. © 2012 John Wiley & Sons Ltd.

  18. The use of subcutaneous infusion in medication administration.

    PubMed

    Gabriel, Janice

    The subcutaneous administration of medications is an area that receives little attention compared with other types of parenteral therapy. Parenteral administration is used by many thousands of patients who self-administer their medication on a daily basis-for example, those using insulin to manage diabetes, recipients of some types of hormone therapy and so on. It is also an effective route for the continuous administration of medication(s) in individuals who are terminally ill. Patients approaching the end of their life may be unable to tolerate the administration of oral medication to control their symptoms and make them more comfortable. This paper will discuss how subcutaneous infusion can be used to deliver these medications, but at the same time how important the selection of the most appropriate subcutaneous infusion device is to the overall comfort of the patient, and to reduce the potential for sharps-related injuries to healthcare workers. Appropriate device selection, together with its management, is an important contributing factor to patient safety and comfort. It will diminish the potential for premature device loss, which can lead to repeated insertion procedures for the patient, as well as delaying their medication. There is also a resource implication for the NHS, as the replacement of any device involves the use of additional equipment and staff time. Additionally, the use of any infusion device poses a risk to healthcare workers of acquiring a bloodborne infection should they experience a percutaneous injury. Knowledge of what equipment is available will reduce the potential risk to these staff.

  19. 12 CFR 615.5180 - Interest rate risk management by banks-general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Interest rate risk management by banks-general... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5180 Interest rate risk management by banks—general. The board of directors of each Farm Credit Bank...

  20. 12 CFR 615.5180 - Interest rate risk management by banks-general.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 7 2013-01-01 2013-01-01 false Interest rate risk management by banks-general... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5180 Interest rate risk management by banks—general. The board of directors of each Farm Credit Bank...