  1. VIEW SOUTHEASTBUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW SOUTHEAST-BUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING MACHINE - John A. Roebling's Sons Company & American Steel & Wire Company, South Broad, Clark, Elmer, Mott & Hudson Streets, Trenton, Mercer County, NJ

  2. Eliminating a Major Cause of Wire Drawing Breakage in A-15 High-Field Superconductors

    SciTech Connect

    Austen, Alfred R.

    2003-05-20

    Eliminating a Major Cause of Wire Drawing Breakage in A-15 High-Field Superconductors Phase 1 Summary Purpose of the research: The Phase 1 goal was to make a significant improvement in the wire drawing technology used for difficult to draw superconductor precursor composites. Many ductile Nb-Al and Nb-Sn precursor wire composites have experienced the onset of wire drawing breakage at about 1.5 mm diameter. Phase 1 focused on evaluating the role that precision rigid guidance of the wire into the drawing die and the hydrostatic stress state at the die entrance played in preventing wire breakage. Research carried out: The research performed depended upon the construction of both a mechanical wire guide and a hydrostatic pressure stiffened wire guidance system. Innovare constructed the two wire guidance systems and tested them for their ability to reduce wire drawing breakage. One set of hardware provided rigid alignment of the wires to their wire drawing die axes within 0.35 degrees using ''hydrostatic pressure stiffening'' to enable the precision guidance strategy to be implemented for these highly flexible small diameter wires. This apparatus was compared to a guide arrangement that used short span mechanical guide alignment with a misalignment limit of about 0.75 degrees. Four A-15 composite wires with breakage histories were drawn to evaluate the use of these wire guiding systems to reduce and/or eliminate wire breakage. Research findings and results: In Phase 1, a breakthrough in wire drawing technology for A-15 superconductor composites was achieved by dramatically limiting or eliminating breakage in four different A-15 composite precursor wire designs during the drawing of these very desirable composites that previously could not be drawn to near final size. Research results showed that the proposed Phase 1 mechanical wire guides were sufficiently effective and successful in eliminating breakage when used along with other advanced wire drawing technology to

  3. Ultrasonic drawing of tungsten wire for incandescent lamps production.

    PubMed

    Mordyuk, B N; Mordyuk, V S; Buryak, V V

    2004-04-01

    An influence of ultrasonic treatment (drawing) on structure, high temperature durability, evaporation and creep behaviours of tungsten single crystal and wires were investigated. A relation of tungsten wires properties with dislocation distribution was determined.

  4. 1. Copy of Drawing, 'American Steel & Wire Co., Central ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Copy of Drawing, 'American Steel & Wire Co., Central Furnace Works -- Sketch of Plant Showing Tracks & Buildings, 1913, Revised 3/10/31.' Drawing courtesy United States Steel Corporation, Lorain, Ohio. Credit Berni Rich, Score Photographs, August 1979, for photos 1 through 4 and 7 through 11. - Central Furnaces, 2650 Broadway, east bank of Cuyahoga River, Cleveland, Cuyahoga County, OH

  5. Influence of Flaws of Wire Rod Surface, Inclusions and Voids on Wire Breaks in Superfine Wire Drawing

    NASA Astrophysics Data System (ADS)

    Yoshida, Kazunari; Norasethasopon, Somchai; Shinohara, Tetsuo; Ido, Ryuta

    By means of the finite element analysis (FEA), this study analyzed wire breaks that occurred in the drawing fine wires containing flaws on the wire surface, inclusion and void. The deformation behavior of an inclusion was examined, in which the inclusion's location is assumed to be on the center axis of the wire, and the cause of wire breaks and their prevention method were clarified. It was found that an inclusion diameter/wire diameter ratio of 0.4 or higher increases the likelihood of wire breaks occurring. When the inclusion is not assumed to be in the center axis of the wire, it was also found that necking and wire breaks appear more frequently. FEA showed that a flaw grows with each processing step, when a small circumferential flaw is placed on the wire rod surface, and eventually becomes a surface defect, which is called a check mark in practice.

  6. Prediction of Central Burst Defects in Copper Wire Drawing Process

    SciTech Connect

    Vega, G.; Haddi, A.; Imad, A.

    2011-01-17

    In this study, the prediction of chevron cracks (central bursts) in copper wire drawing process is investigated using experimental and numerical approaches. The conditions of the chevron cracks creation along the wire axis depend on (i) the die angle, the friction coefficient between the die and the wire, (ii) the reduction in crosssectional area of the wire, (iii) the material properties and (iv) the drawing velocity or strain rate. Under various drawing conditions, a numerical simulation for the prediction of central burst defects is presented using an axisymmetric finite element model. This model is based on the application of the Cockcroft and Latham fracture criterion. This criterion was used as the damage value to estimate if and where defects will occur during the copper wire drawing. The critical damage value of the material is obtained from a uniaxial tensile test. The results show that the die angle and the reduction ratio have a significant effect on the stress distribution and the maximum damage value. The central bursts are expected to occur when the die angle and reduction ratio reach a critical value. Numerical predictions are compared with experimental observations.

  7. Environmental assessment of lubricants before and after wire drawing process.

    PubMed

    Ruiz, M C; Verde, J; Andrés, A; Viguri, J; Irabien, A

    2001-08-17

    Iron wire drawing processes involve the use of solid lubricants made of powdered raw materials, which lead to industrial wastes after being used. These wastes, based on stearates, have a negative effect on the environment. This study deals with the environmental assessment of some lubricants before and after the wire drawing process in a Spanish factory. The parameters evaluated for this study have been total organic carbon (TOC), mobility of zinc and lead, and ecotoxicity (EC(50)). Results show that wastes have more ecotoxicity than the original lubricants due to the content of metals that lubricants pick up from the wire, as pickling, patenting and galvanising take part in the manufacture. The capture of metallic particles leads to a reduction of TOC and an increase in ecotoxicity.

  8. An advanced arc track resistant airframe wire

    NASA Technical Reports Server (NTRS)

    Beatty, J.

    1995-01-01

    Tensolite, a custom cable manufacturer specializing in high temperature materials as the dielectric medium, develops an advance arc track resistant airframe wire called Tufflite 2000. Tufflite 2000 has the following advantages over the other traditional wires: lighter weight and smaller in diameter; excellent wet and dry arc track resistance; superior dynamic cut-through performance even at elevated temperatures; flight proven performance on Boeing 737 and 757 airplanes; and true 260 C performance by utilizing Nickel plated copper conductors. This paper reports the different tests performed on Tufflite 2000: accelerated aging, arc resistance (wet and dry), dynamic cut through, humidity resistance, wire-to-wire abrasion, flammability, smoke, weight, notch sensitivity, flexibility, and markability. It particularly focuses on the BSI (British Standards Institute) dry arc resistance test and BSI wet arc tracking.

  9. The Microstructure and Hardness of Hot Dip Galvanized Steel During Wire Drawing

    SciTech Connect

    Klmaku, Snukn; Syla, Nairn; Dilo, Teuta

    2010-01-21

    The steel wire samples are hot-dip-galvanized. The zinc coating is preformed using the standard method. To recognize the behavior of the zinc coated steel wire during the submission to deformation, the wire samples are drawn on a machine designed for this aim and then investigated. In this research is represented the phase structure of the zinc coated samples. Afterwards the thickness of the layer and the hardness of the hot-dip galvanized steel depending on the drawing is represented.

  10. Mechanical properties and aesthetics of FRP orthodontic wire fabricated by hot drawing.

    PubMed

    Imai, T; Watari, F; Yamagata, S; Kobayashi, M; Nagayama, K; Toyoizumi, Y; Nakamura, S

    1998-12-01

    The FRP wires 0.5 mm in diameter with a multiple fiber structure were fabricated by drawing the fiber polymer complex at 250 degrees C for an esthetic, transparent orthodontic wire. Biocompatible CaO-P2O5-SiO2-Al2O3 (CPSA) glass fibers of 8-20 microm in diameter were oriented unidirectionally in the longitudinal direction in PMMA matrix. The mechanical properties were investigated by 3-point flexural test. The FRP wire showed sufficient strength and a very good elastic recovery after deformation. Young's modulus and the flexural load at deflection 1 mm were nearly independent of the fiber diameter and linearly increased with the fiber fraction. The dependence on fiber fraction obeys well the rule of mixture. This FRP wire could cover the range of strength corresponding to the conventional metal orthodontic wires from Ni-Ti used in the initial stage of orthodontic treatments to Co-Cr used in the final stage by changing the volume ratio of glass fibers with the same external diameter. The estheticity in external appearance was excellent. Thus the new FRP wire can satisfy both mechanical properties necessary for an orthodontic wire and enough estheticity, which was not possible for the conventional metal wire.

  11. CJ concept for advanced aircraft wiring

    NASA Technical Reports Server (NTRS)

    Redslob, J.

    1972-01-01

    The techniques and hardware are described which were developed for facilitating the use of flexible flat conductor cable (FFCC) in commercial air transports. The system was designed as an evolutionary transition from the current round wire harnessing to the use of FFCC harnesses. The equipment discussed includes the pressure crimp barrel designed for terminating FFCC, reel-fed applicator, cable connectors and adaptors, and equipment racks.

  12. Highly dense and perfectly aligned single-walled carbon nanotubes fabricated by diamond wire drawing dies.

    PubMed

    Liu, Guangtong; Zhao, Yuanchun; Deng, Ke; Liu, Zheng; Chu, Weiguo; Chen, Jingran; Yang, Yanlian; Zheng, Kaihong; Huang, Haibo; Ma, Wenjun; Song, Li; Yang, Haifang; Gu, Changzhi; Rao, Guanghui; Wang, Chen; Xie, Sishen; Sun, Lianfeng

    2008-04-01

    We have developed a low-cost and effective method to align single-walled carbon nanotubes (SWNTs) using a series of diamond wire drawing dies. The obtained SWNTs are highly dense and perfectly aligned. X-ray diffraction (XRD) indicates that the highly dense and perfectly aligned SWNTs (HDPA-SWNTs) form a two-dimensional triangular lattice with a lattice constant of 19.62 A. We observe a sharp (002) reflection in the XRD pattern, which should be ascribed to an intertube spacing 3.39 A of adjacent SWNTs. Raman spectra reveal that the radical breath mode (RBM) of SWNTs with larger diameter in the HDPA-SWNTs is suppressed compared with that of as-grown SWNTs. The HDPA-SWNTs have a large density, approximately 1.09 g/cm 3, and a low resistivity, approximately 2 m Omega cm, at room temperature, as well as a large response to light illumination.

  13. Effect of reduction of area on microstructure and mechanical properties of twinning-induced plasticity steel during wire drawing

    NASA Astrophysics Data System (ADS)

    Hwang, Joong-Ki; Son, Il-Heon; Yoo, Jang-Yong; Zargaran, A.; Kim, Nack J.

    2015-09-01

    The effect of reduction of area (RA), 10%, 20%, and 30%, during wire drawing on the inhomogeneities in microstructure and mechanical properties along the radial direction of Fe-Mn-Al-C twinning-induced plasticity steel has been investigated. After wire drawing, the deformation texture developed into the major <111> and minor <100> duplex fiber texture. However, the <111> texture became more pronounced in both center and surface areas as the RA per pass increased. It also shows that a larger RA per pass resulted in a higher yield strength and smaller elongation than a smaller RA per pass at all strain levels. Although inhomogeneities in microstructure and mechanical properties along the radial direction decreased with increasing RA per pass, there existed an optimum RA per pass for maximum drawing limit. Insufficient penetration of strain from surface to center at small RA per pass (e.g., 10%) and high friction and unsound metal flow at large RA per pass (e.g., 30%) all resulted in heterogeneous microstructure and mechanical properties along the radial direction of drawn wire. On the other hand, 20% RA per pass improved the drawing limit by about 30% as compared to the 10% and 30% RAs per pass.

  14. Atomic scale investigation of redistribution of alloying elements in pearlitic steel wires upon cold-drawing and annealing.

    PubMed

    Li, Y J; Choi, P; Goto, S; Borchers, C; Raabe, D; Kirchheim, R

    2013-09-01

    A local electrode atom probe has been employed to analyze the redistribution of alloying elements including Si, Mn, and Cr in pearlitic steel wires upon cold-drawing and subsequent annealing. It has been found that the three elements undergo mechanical mixing upon cold-drawing at large strains, where Mn and Cr exhibit a nearly homogeneous distribution throughout both ferrite and cementite, whereas Si only dissolves slightly in cementite. Annealing at elevated temperatures leads to a reversion of the mechanical alloying. Si atoms mainly segregate at well-defined ferrite (sub)grain boundaries formed during annealing. Cr and Mn are strongly concentrated in cementite adjacent to the ferrite/cementite interface due to their lower diffusivities in cementite than in ferrite.

  15. Measurement and modeling of dispersive pulse propagation in draw wire waveguides

    NASA Technical Reports Server (NTRS)

    Madaras, Eric I.; Kohl, Thomas W.; Rogers, Wayne P.

    1995-01-01

    An analytical model of dispersive pulse propagation in semi-infinite cylinders due to transient axially symmetric end conditions has been experimentally investigated. Specifically, the dispersive propagation of the first axially symmetric longitudinal mode in thin wire waveguides, which have ends in butt contact with longitudinal piezoelectric ultrasonic transducers, is examined. The method allows for prediction of a propagated waveform given a measured source waveform, together with the material properties of the cylinder. Alternatively, the source waveform can be extracted from measurement of the propagated waveform. The material properties required for implementation of the pulse propagation model are determined using guided wave phase velocity measurements. Hard tempered aluminum 1100 and 304 stainless steel wires, with 127, 305, and 406 micron diam., were examined. In general, the drawn wires were found to behave as transversely isotropic media.

  16. Analysis of Microstructure and Damage Evolution in Ultra-Thin Wires of the Magnesium Alloy MgCa0.8 at Multipass Drawing

    NASA Astrophysics Data System (ADS)

    Milenin, Andrij; Kustra, Piotr; Byrska-Wójcik, Dorota; Grydin, Olexandr; Schaper, Mirko; Mentlein, Thorben; Gerstein, Gregory; Nürnberger, Florian

    2016-12-01

    A combined multipass hot and cold drawing process was implemented to manufacture ultra-thin wires of the magnesium alloy MgCa0.8 with a final diameter of 0.05 mm. Numerical simulations were applied to design the drawing process of 40 passes regarding the microstructure evolution. To parametrize the model, in situ tensile tests were performed. Analysis of the MgCa0.8 wires featuring diameters below 0.1 mm revealed no intergranular crack initiation. The grain size of the ultra-thin wires is within the range of 30-500 nm with grains elongated in the drawing direction. The fine-grained microstructure provides high mechanical strength properties.

  17. Advances in the development of wire mesh reactor for coal gasification studies.

    PubMed

    Zeng, Cai; Chen, Lei; Liu, Gang; Li, Wenhua; Huang, Baoming; Zhu, Hongdong; Zhang, Bing; Zamansky, Vladimir

    2008-08-01

    In an effort to further understand the coal gasification behavior in entrained-flow gasifiers, a high pressure and high temperature wire mesh reactor with new features was recently built. An advanced LABVIEW-based temperature measurement and control system were adapted. Molybdenum wire mesh with aperture smaller than 70 mum and type D thermocouple were used to enable high carbon conversion (>90%) at temperatures >1000 degrees C. Gaseous species from wire mesh reactor were quantified using a high sensitivity gas chromatography. The material balance of coal pyrolysis in wire mesh reactor was demonstrated for the first time by improving the volatile's quantification techniques.

  18. Advances in the development of wire mesh reactor for coal gasification studies - article no. 084102

    SciTech Connect

    Zeng, C.; Chen, L.; Liu, G.; Li, W.H.; Huang, B.M.; Zhu, H.D.; Zhang, B.; Zamansky, V.

    2008-08-15

    In an effort to further understand the coal gasification behavior in entrained-flow gasifiers, a high pressure and high temperature wire mesh reactor with new features was recently built. An advanced LABVIEW-based temperature measurement and control system were adapted. Molybdenum wire mesh with aperture smaller than 70 {mu} m and type D thermocouple were used to enable high carbon conversion ({gt}90%) at temperatures {gt}1000 {sup o}C. Gaseous species from wire mesh reactor were quantified using a high sensitivity gas chromatography. The material balance of coal pyrolysis in wire mesh reactor was demonstrated for the first time by improving the volatile's quantification techniques.

  19. NASA's advanced control law program for the F-8 digital fly-by-wire aircraft

    NASA Technical Reports Server (NTRS)

    Elliott, J. R.

    1977-01-01

    This paper briefly describes the NASA F-8 Digital Fly-By-Wire (DFBW) and Langley Research Center's role in investigating and promoting advanced control laws for possible flight experimentation and also provides a brief description of the Phase II DFBW F-8 aircraft and its control system. Some of the advanced control law study objectives and guidelines are discussed, and some mathematical models which are useful in the control analysis problem are provided.

  20. Recent advances in theoretical and numerical studies of wire array Z-pinch in the IAPCM

    SciTech Connect

    Ding, Ning Zhang, Yang Xiao, Delong Wu, Jiming Huang, Jun Yin, Li Sun, Shunkai Xue, Chuang Dai, Zihuan Ning, Cheng Shu, Xiaojian Wang, Jianguo Li, Hua

    2014-12-15

    Fast Z-pinch has produced the most powerful X-ray radiation source in laboratory and also shows the possibility to drive inertial confinement fusion (ICF). Recent advances in wire-array Z-pinch researches at the Institute of Applied Physics and Computational Mathematics are presented in this paper. A typical wire array Z-pinch process has three phases: wire plasma formation and ablation, implosion and the MRT instability development, stagnation and radiation. A mass injection model with azimuthal modulation coefficient is used to describe the wire initiation, and the dynamics of ablated plasmas of wire-array Z-pinches in (r, θ) geometry is numerically studied. In the implosion phase, a two-dimensional(r, z) three temperature radiation MHD code MARED has been developed to investigate the development of the Magneto-Rayleigh-Taylor(MRT) instability. We also analyze the implosion modes of nested wire-array and find that the inner wire-array is hardly affected before the impaction of the outer wire-array. While the plasma accelerated to high speed in the implosion stage stagnates on the axis, abundant x-ray radiation is produced. The energy spectrum of the radiation and the production mechanism are investigated. The computational x-ray pulse shows a reasonable agreement with the experimental result. We also suggest that using alloyed wire-arrays can increase multi-keV K-shell yield by decreasing the opacity of K-shell lines. In addition, we use a detailed circuit model to study the energy coupling between the generator and the Z-pinch implosion. Recently, we are concentrating on the problems of Z-pinch driven ICF, such as dynamic hohlraum and capsule implosions. Our numerical investigations on the interaction of wire-array Z-pinches on foam convertors show qualitative agreements with experimental results on the “Qiangguang I” facility. An integrated two-dimensional simulation of dynamic hohlraum driven capsule implosion provides us the physical insights of wire

  1. Recent advances in theoretical and numerical studies of wire array Z-pinch in the IAPCM

    NASA Astrophysics Data System (ADS)

    Ding, Ning; Zhang, Yang; Xiao, Delong; Wu, Jiming; Huang, Jun; Yin, Li; Sun, Shunkai; Xue, Chuang; Dai, Zihuan; Ning, Cheng; Shu, Xiaojian; Wang, Jianguo; Li, Hua

    2014-12-01

    Fast Z-pinch has produced the most powerful X-ray radiation source in laboratory and also shows the possibility to drive inertial confinement fusion (ICF). Recent advances in wire-array Z-pinch researches at the Institute of Applied Physics and Computational Mathematics are presented in this paper. A typical wire array Z-pinch process has three phases: wire plasma formation and ablation, implosion and the MRT instability development, stagnation and radiation. A mass injection model with azimuthal modulation coefficient is used to describe the wire initiation, and the dynamics of ablated plasmas of wire-array Z-pinches in (r, θ) geometry is numerically studied. In the implosion phase, a two-dimensional(r, z) three temperature radiation MHD code MARED has been developed to investigate the development of the Magneto-Rayleigh-Taylor(MRT) instability. We also analyze the implosion modes of nested wire-array and find that the inner wire-array is hardly affected before the impaction of the outer wire-array. While the plasma accelerated to high speed in the implosion stage stagnates on the axis, abundant x-ray radiation is produced. The energy spectrum of the radiation and the production mechanism are investigated. The computational x-ray pulse shows a reasonable agreement with the experimental result. We also suggest that using alloyed wire-arrays can increase multi-keV K-shell yield by decreasing the opacity of K-shell lines. In addition, we use a detailed circuit model to study the energy coupling between the generator and the Z-pinch implosion. Recently, we are concentrating on the problems of Z-pinch driven ICF, such as dynamic hohlraum and capsule implosions. Our numerical investigations on the interaction of wire-array Z-pinches on foam convertors show qualitative agreements with experimental results on the "Qiangguang I" facility. An integrated two-dimensional simulation of dynamic hohlraum driven capsule implosion provides us the physical insights of wire

  2. Diagnostic Accuracy of the Overlapping Infinity Loops, Wire Cube, and Clock Drawing Tests for Cognitive Impairment in Mild Cognitive Impairment and Dementia

    PubMed Central

    2017-01-01

    Purpose. To investigate the diagnostic accuracy of the overlapping infinity loops, wire cube, and clock drawing tests (CDT) in the detection of mild cognitive impairment (MCI) and dementia. Method. The participants were 60 normal controls (NC), 35 patients with MCI, and 47 patients with mild dementia. Results. The results illustrate that infinity loops, cube, or CDT were not able to discriminate between NC and MCI groups. In dementia detection, the CDT had the highest diagnostic accuracy (sensitivity 76.6% and specificity 87.4%) followed by infinity loops (sensitivity 63.8% and specificity 91.6%) and cube (sensitivity 93.6% and specificity 46.3%). Conclusion. This study demonstrates that the three drawing tests are sensitive detectors of dementia but not MCI. PMID:28255496

  3. Diagnostic Accuracy of the Overlapping Infinity Loops, Wire Cube, and Clock Drawing Tests for Cognitive Impairment in Mild Cognitive Impairment and Dementia.

    PubMed

    Charernboon, Thammanard

    2017-01-01

    Purpose. To investigate the diagnostic accuracy of the overlapping infinity loops, wire cube, and clock drawing tests (CDT) in the detection of mild cognitive impairment (MCI) and dementia. Method. The participants were 60 normal controls (NC), 35 patients with MCI, and 47 patients with mild dementia. Results. The results illustrate that infinity loops, cube, or CDT were not able to discriminate between NC and MCI groups. In dementia detection, the CDT had the highest diagnostic accuracy (sensitivity 76.6% and specificity 87.4%) followed by infinity loops (sensitivity 63.8% and specificity 91.6%) and cube (sensitivity 93.6% and specificity 46.3%). Conclusion. This study demonstrates that the three drawing tests are sensitive detectors of dementia but not MCI.

  4. Review of status and potential of tungsten-wire: Superalloy composites for advanced gas turbine engine blades

    NASA Technical Reports Server (NTRS)

    Signorelli, R. A.

    1972-01-01

    The current status of development of refractory-wire-superalloy composites and the potential for their application to turbine blades in land-based power generation and advanced aircraft engines are reviewed. The data indicate that refractory-wire-superalloy composites have application as turbine blades at temperatures of 2200 F and above.

  5. Recent advances in high-temperature superconductor wire fabrication and applications development

    SciTech Connect

    Hull, J.R.; Uherka, K.L.

    1992-08-01

    In this paper, recent advances in fabrication of HTS wires are summarized, and detailed discussion is provided for developments in near- and intermediate-term applications. Near-term applications, using presently obtainable current densities, include: liquid-nitrogen depth sensors, cryostat current leads, and magnetic bearings. Intermediate-term applications, using current densities expected to be available in the near future include fault-current limiters and short transmission lines. 25 refs.

  6. Recent advances in high-temperature superconductor wire fabrication and applications development

    SciTech Connect

    Hull, J.R.; Uherka, K.L.

    1992-01-01

    In this paper, recent advances in fabrication of HTS wires are summarized, and detailed discussion is provided for developments in near- and intermediate-term applications. Near-term applications, using presently obtainable current densities, include: liquid-nitrogen depth sensors, cryostat current leads, and magnetic bearings. Intermediate-term applications, using current densities expected to be available in the near future include fault-current limiters and short transmission lines. 25 refs.

  7. Advanced system demonstration for utilization of biomass as an energy source. Volume IV. Design drawings

    SciTech Connect

    1980-10-01

    This volume contains design drawings for the biomass cogeneration plant to be built in Maine. The drawings show a considerable degree of detail, however, they are not to be considered released for construction. There has been no actual procurement of equipment, therefore equipment drawings certified by suppliers have not been included. (DMC)

  8. SpaceWire- Based Control System Architecture for the Lightweight Advanced Robotic Arm Demonstrator [LARAD

    NASA Astrophysics Data System (ADS)

    Rucinski, Marek; Coates, Adam; Montano, Giuseppe; Allouis, Elie; Jameux, David

    2015-09-01

    The Lightweight Advanced Robotic Arm Demonstrator (LARAD) is a state-of-the-art, two-meter long robotic arm for planetary surface exploration currently being developed by a UK consortium led by Airbus Defence and Space Ltd under contract to the UK Space Agency (CREST-2 programme). LARAD has a modular design, which allows for experimentation with different electronics and control software. The control system architecture includes the on-board computer, control software and firmware, and the communication infrastructure (e.g. data links, switches) connecting on-board computer(s), sensors, actuators and the end-effector. The purpose of the control system is to operate the arm according to pre-defined performance requirements, monitoring its behaviour in real-time and performing safing/recovery actions in case of faults. This paper reports on the results of a recent study about the feasibility of the development and integration of a novel control system architecture for LARAD fully based on the SpaceWire protocol. The current control system architecture is based on the combination of two communication protocols, Ethernet and CAN. The new SpaceWire-based control system will allow for improved monitoring and telecommanding performance thanks to higher communication data rate, allowing for the adoption of advanced control schemes, potentially based on multiple vision sensors, and for the handling of sophisticated end-effectors that require fine control, such as science payloads or robotic hands.

  9. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect

    Mark B. Murphy

    2002-12-31

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  10. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect

    Mark B. Murphy

    2004-01-31

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  11. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect

    Mark B. Murphy

    2003-10-31

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  12. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect

    Mark B. Murphy

    2003-07-30

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  13. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect

    Mark B. Murphy

    2002-09-30

    The overall objective of this project is to demonstrate that a development program-based on advanced reservoir management methods-can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry. This is the twenty-eighth quarterly progress report on the project. Results obtained to date are summarized.

  14. Advanced signal processing methods applied to guided waves for wire rope defect detection

    NASA Astrophysics Data System (ADS)

    Tse, Peter W.; Rostami, Javad

    2016-02-01

    Steel wire ropes, which are usually composed of a polymer core and enclosed by twisted wires, are used to hoist heavy loads. These loads are different structures that can be clamshells, draglines, elevators, etc. Since the loading of these structures is dynamic, the ropes are working under fluctuating forces in a corrosive environment. This consequently leads to progressive loss of the metallic cross-section due to abrasion and corrosion. These defects can be seen in the forms of roughened and pitted surface of the ropes, reduction in diameter, and broken wires. Therefore, their deterioration must be monitored so that any unexpected damage or corrosion can be detected before it causes fatal accident. This is of vital importance in the case of passenger transportation, particularly in elevators in which any failure may cause a catastrophic disaster. At present, the widely used methods for thorough inspection of wire ropes include visual inspection and magnetic flux leakage (MFL). Reliability of the first method is questionable since it only depends on the operators' eyes that fails to determine the integrity of internal wires. The later method has the drawback of being a point by point and time-consuming inspection method. Ultrasonic guided wave (UGW) based inspection, which has proved its capability in inspecting plate like structures such as tubes and pipes, can monitor the cross-section of wire ropes in their entire length from a single point. However, UGW have drawn less attention for defect detection in wire ropes. This paper reports the condition monitoring of a steel wire rope from a hoisting elevator with broken wires as a result of corrosive environment and fatigue. Experiments were conducted to investigate the efficiency of using magnetostrictive based UGW for rope defect detection. The obtained signals were analyzed by two time-frequency representation (TFR) methods, namely the Short Time Fourier Transform (STFT) and the Wavelet analysis. The location of

  15. [The visual perception of the elements of technical drawings among masking distractions in advanced and nonadvanced students in the building and architectural professions].

    PubMed

    Balichev, Iu

    1997-01-01

    To investigation were submitted the particularities of the process of visual perception of technical drawings and schemes in advanced and backward pupils, who were mastering the specialties of "building and architecture", "hydroconstruction", "transport construction", "geodesy". The time was registered, which was necessary to advanced and backward pupils for unveiling the different elements in the drawing, scheme, and such attributes of the drawing as: orientation, length, curves of the lined, the boundary between them; time for identification of the specific designations, symbols, group of symbols, elements of the sketch from the simple to the complex ones. The results of the investigations revealed that in the advanced pupils the perception (unveiling) of the different elements of the technical drawing proceeded very rapidly, almost automatically. In the backward pupils this process elapsed reliably more slowly. It was demonstrated that the growing up pupils, who were distinguished with more rapid perception of the different elements of the drawing (advanced ones) more rapidly and more exactly dealt with solution of the technical tasks as compared with these, who more slowly unveiled the looked for elements (backwardness). Some other individual particularities were also established with respect to the visual perception of the elements of the technical drawing and its properties in advanced and backward pupils who were mastering the investigated professions.

  16. Drawing Inventors

    ERIC Educational Resources Information Center

    Szekely, George

    2012-01-01

    Children are drawing inventors. Their art is certainly not what most adults think of as drawing. Almost instinctively, kids know that drawing is everywhere--that they can draw with almost anything, and that innumerable surfaces can be converted for art use. Teaching drawing is showing interest and enthusiasm for kids' drawing inventions--instead…

  17. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III

    SciTech Connect

    Murphy, Mark B.

    2002-01-16

    The overall objective of this project was to demonstrate that a development program-based on advanced reservoir management methods-can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan included developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals were (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  18. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III

    SciTech Connect

    Murphy, Michael B.

    2002-02-21

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  19. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM

    SciTech Connect

    Mark B. Murphy

    2005-09-30

    The Nash Draw Brushy Canyon Pool in Eddy County New Mexico was a cost-shared field demonstration project in the U.S. Department of Energy Class III Program. A major goal of the Class III Program was to stimulate the use of advanced technologies to increase ultimate recovery from slope-basin clastic reservoirs. Advanced characterization techniques were used at the Nash Draw Pool (NDP) project to develop reservoir management strategies for optimizing oil recovery from this Delaware reservoir. The objective of the project was to demonstrate that a development program, which was based on advanced reservoir management methods, could significantly improve oil recovery at the NDP. Initial goals were (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to other oil and gas producers. Analysis, interpretation, and integration of recently acquired geological, geophysical, and engineering data revealed that the initial reservoir characterization was too simplistic to capture the critical features of this complex formation. Contrary to the initial characterization, a new reservoir description evolved that provided sufficient detail regarding the complexity of the Brushy Canyon interval at Nash Draw. This new reservoir description was used as a risk reduction tool to identify 'sweet spots' for a development drilling program as well as to evaluate pressure maintenance strategies. The reservoir characterization, geological modeling, 3-D seismic interpretation, and simulation studies have provided a detailed model of the Brushy Canyon zones. This model was used to predict the success of different reservoir management scenarios and to aid in determining the most favorable combination of targeted drilling, pressure maintenance, well stimulation, and well spacing to improve recovery from this reservoir. An Advanced

  20. Children's Drawings.

    ERIC Educational Resources Information Center

    Burgess, Ann W.; Hartman, Carol R.

    1993-01-01

    This paper reviews the literature on projective drawing tests and child sexual abuse, focusing on children's drawings as an associative tool for memory. The use of the event drawing series, which is a series of seven drawings by a child that graphically present the child's thinking about a specific event, is discussed. (JDD)

  1. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect

    Mark B. Murphy

    2001-10-31

    The Nash Draw Brushy Canyon Pool (NDP) in southeast New Mexico is one of the nine projects selected in 1995 by the U.S. Department of Energy (DOE) for participation in the Class III Reservoir Field Demonstration Program. The goals of the DOE cost-shared Class Program are to: (1) extend economic production, (2) increase ultimate recovery, and (3) broaden information exchange and technology application. Reservoirs in the Class III Program are focused on slope basin and deep-basin clastic depositional types. Production at the NDP is from the Brushy Canyon formation, a low-permeability turbidite reservoir in the Delaware Mountain Group of Permian, Guadalupian age. A major challenge in this marginal-quality reservoir is to distinguish oil-productive pay intervals from water-saturated non-pay intervals. Because initial reservoir pressure is only slightly above bubble-point pressure, rapid oil decline rates and high gas/oil ratios are typically observed in the first year of primary production. Limited surface access, caused by the proximity of underground potash mining and surface playa lakes, prohibits development with conventional drilling. Reservoir characterization results obtained to date at the NDP show that a proposed pilot injection area appears to be compartmentalized. Because reservoir discontinuities will reduce effectiveness of a pressure maintenance project, the pilot area will be reconsidered in a more continuous part of the reservoir if such areas have sufficient reservoir pressure. Most importantly, the advanced characterization results are being used to design extended reach/horizontal wells to tap into predicted ''sweet spots'' that are inaccessible with conventional vertical wells. The activity at the NDP during the past year has included the completion of the NDP Well No.36 deviated/horizontal well and the completion of additional zones in three wells, the design of the NDP No.33 directional/horizontal well, The planning and regulatory approval for the

  2. Basic EMC technology advancement for C(3) systems. Volume 4C: Crosstalk in twisted-wire circuits

    NASA Astrophysics Data System (ADS)

    Jolly, M. B.; Paul, C. R.

    1982-11-01

    An investigation of wire-to-wire crosstalk is presented in an attempt to accurately predict the magnitude of the voltage coupled to a twisted wire pair. A sensitivity analysis of the twisted wire pair is conducted to determine the effect that line twist has on the coupled differential mode voltage when the twisted pair is connected in an unbalanced configuration. An improved computer model is developed to aid in the prediction of the voltage coupled to the twisted wire pair when it is terminated in low impedance loads. Another circuit configuration which is investigated consists of a differential line driver connected to a differential line receiver by a twisted wire pair. Predictions of the common mode voltage coupled to the twisted pair are computed with a single wire model and a comparison is made with experimental results.

  3. Fabrication of Pd-Cr wire

    NASA Technical Reports Server (NTRS)

    Diamond, Sidney; Leach, Dennen M.

    1989-01-01

    Fabrication of Pd-13 percent Cr alloy wires is described. Melting, casting, swaging and annealing processes are discussed. Drawing to reach two diameters (0.003 inch and 0.00176 inch) of wire is described. Representative micrographs of the Pd-Cr alloy at selected stages during wire fabrication are included. The resistance of the wire was somewhat lower, by about 15 to 20 percent, than comparable wire of other alloys used for strain gages.

  4. 76 FR 27007 - Steel Wire Garment Hangers From the People's Republic of China: Affirmative Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... first two stages, described as steel wire drawing and molding, were performed in the PRC by Company X... Chinese production processes for the first two steps (wire drawing stage and wire shaping forming stage...\\ According to Angang, the equipment and labor involved in the wire drawing, cutting, and shaping stages...

  5. 2016 MOST WIRED.

    PubMed

    Barr, Paul; Butcher, Lola; Hoppszallern, Suzanna

    2016-07-01

    This year's IT survey shows that hospitals are aggressively fighting cyber crime and looking for ways to use data to help in the transition to value-based care. Find out who made the 2016 lists of Most Wired, Most Advanced, Most Improved and Most Wired-Small and Rural.

  6. Texture development in Galfenol wire

    NASA Astrophysics Data System (ADS)

    Boesenberg, A. J.; Restorff, J. B.; Wun-Fogle, M.; Sailsbury, H.; Summers, E.

    2013-05-01

    Galfenol (Fe-Ga alloy) wire fabrication provides a low cost alternative to directional solidification methods. This work evaluates the compositional dependence of the wire drawing suitability of Fe-Ga and characterizes the microstructural and magnetic properties of these wires. Wire has been produced with Ga contents between 10 at. % and 17 at. % to allow determination of the ductile to brittle transition (DTBT) in wire manufacture. Published results on chill cast bend specimens indicated that a DTBT occurs at roughly 15 at. % Ga. This DTBT was observed under tensile loading with a corresponding change in fracture behavior from transverse fracture to intergranular fracture. For improved magnetostrictive performance, higher Ga contents are desired, closer to the 17 at. % Ga evaluated in this work. Electron backscattered diffraction B-H loop and resonance measurements as a function of magnetic field (to determine modulus and coupling factor) are presented for as-drawn, furnace, and direct current (DC) annealed wire. Galfenol wire produced via traditional drawing methods is found to have a strong <110> (α) texture parallel to the drawing direction. As-drawn wire was observed to have a lower magnetic permeability and larger hysteresis than DC annealed wire. This is attributed to the presence of a large volume of crystalline defects; such as vacancies and dislocations.

  7. Basic Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This module is the first in a series of three wiring publications; it serves as the foundation for students enrolled in a wiring program. It is a prerequisite to either "Residential Wiring" or "Commercial and Industrial Wiring." The module contains 16 instructional units that cover the following topics: occupational…

  8. Drafting. Advanced Print Reading--Electrical.

    ERIC Educational Resources Information Center

    Oregon State Dept. of Education, Salem.

    This document is a workbook for drafting students learning advanced print reading for electricity applications. The workbook contains seven units covering the following material: architectural working drawings; architectural symbols and dimensions; basic architectural electrical symbols; wiring symbols; riser diagrams; schematic diagrams; and…

  9. Advanced constitutive modeling of AHSS sheets forapplication to springback prediction after U-draw double stamping process

    NASA Astrophysics Data System (ADS)

    Choi, Jisik; Lee, Jinwoo; Lee, Myoung-Gyu; Barlat, Frederic

    2016-08-01

    The reduction of springback for a U-shaped channel using a double drawing process was investigated. In this test, the punch strokes of the 1st and 2nd stamping steps were controlled and each followed by unloading. The simulations were conducted using kinematic and distortional hardening models, which were implemented into a finite element (FE) code to describe the Bauschinger effect and its associated anisotropic hardening effects during strain path change. In addition to the usual mechanical characterization tests, in-plane compression- tension experiments were conducted on DP980 and TWIP980 to determine the constitutive parameters pertaining to load reversal. Experimental and FE simulated results of the channel shape were compared for both materials in order to understand the effect of anisotropic hardening under non-proportional loading on springback.

  10. Mechanical Drawing and Design.

    ERIC Educational Resources Information Center

    Mikulsky, Marilyn; McEnaney, Walter K.

    A syllabus is provided for a comprehensive foundation course in mechanical drawing and design for grades 9, 10, 11, or 12 that is prerequisite to advanced elective courses. Introductory materials include course objectives, an overview of basic concepts, and guidelines for implementation. Brief discussions of and suggestions for the areas of design…

  11. Superconducting wire manufactured

    NASA Astrophysics Data System (ADS)

    Fu, Yuexian; Sun, Yue; Xu, Shiming; Peng, Ying

    1985-10-01

    The MF Nb/Cu Extrusion Tube Method was used to manufacture 3 kg of stable practical MF Nb2Sn composite superconducting wire containing pure Cu(RRR approx. 200)/Ta. The draw state composite wire diameter was 0.56 mm, it contained 11,448 x 2.6 micron Nb core, and the twist distance was 1.5 cm. The composite wire cross-section was pure Cu/Ta/11,448 Nb core/Cu/ 91Sn-Cu; containing 22.8 v. % pure Cu, 13.3 v. % Ta; within the Ta layer to prevent Sn diffusion. The wire was sheathed in nonalkaline glass fiber as an insulating layer. A section of wire weighing 160 g was cut off and coiled it into a small solenoid. After reaction diffusion processing at 675 C/30 and curing by vacuum dipping in paraffin, it was measured in a Nb-Ti backfield of 7.2 T intensity, a current of 129 A was passed through the Nb3Sn solenoid and produced a strength of 2.5 T, the overall magnetic field intensity of the composite magnet reached 9.7 T. At this time, the wire full current density J sub c.w. = 5.2 x 10 to the 4th power A/sq cm; the effective current density J sub c (Nb + Sn - Cu) = 8.2 x 10 to the 4th power A/sq cm.

  12. Method of manufacturing superconductor wire

    SciTech Connect

    Motowidlo, Leszek

    2014-09-16

    A method for forming Nb.sub.3Sn superconducting wire is provided. The method employs a powder-in-tube process using a high-tin intermetallic compound, such as MnSn.sub.2, for producing the Nb.sub.3Sn. The use of a high-tin intermetallic compound enables the process to perform hot extrusion without melting the high-tin intermetallic compound. Alternatively, the method may entail drawing the wire without hot extrusion.

  13. An Advanced Fly-By-Wire Flight Control System for the RASCAL Research Rotorcraft: Concept to Reality

    NASA Technical Reports Server (NTRS)

    Rediess, Nicholas A.; Dones, Fernando; McManus, Bruce L.; Ulmer, Lon; Aiken, Edwin W. (Technical Monitor)

    1995-01-01

    Design features of a new fly-by-wire flight control system for the Rotorcraft-Aircrew Systems Concepts Airborne Laboratory (RASCAL) are described. Using a UH-60A Black Hawk helicopter as a baseline vehicle, the RASCAL will be a flying laboratory capable of supporting the research requirements of major NASA and Army guidance, control, and display research programs. The paper describes the research facility requirements of these pro-rams and the design implementation of the research flight control system (RFCS), with emphasis on safety-of-flight, adaptability to multiple requirements and performance considerations.

  14. Advanced Print Reading. Heating, Ventilation and Air Conditioning.

    ERIC Educational Resources Information Center

    Oregon State Dept. of Education, Salem.

    This is a workbook for students learning advanced blueprint reading for heating, ventilation, and air conditioning applications. The workbook contains eight units covering the following material: architectural working drawings; architectural symbols and dimensions; basic architectural electrical symbols; wiring symbols; basic piping symbols;…

  15. A World without Wires

    ERIC Educational Resources Information Center

    Panettieri, Joseph C.

    2006-01-01

    The wireless bandwagon is rolling across Mississippi, picking up a fresh load of converts and turning calamity into opportunity. Traditional wired school networks, many of which unraveled during Hurricane Katrina, are giving way to advanced wireless mesh networks that frequently include voice-over-IP (VoIP) capabilities. Vendor funding is helping…

  16. Residential Wiring.

    ERIC Educational Resources Information Center

    Taylor, Mark

    The second in a series of three curriculum packages on wiring, these materials for a five-unit course were developed to prepare postsecondary students for entry-level employment in the residential wiring trade. The five units are: (1) blueprint reading and load calculations; (2) rough-in; (3) service; (4) trim out and troubleshooting; and (5) load…

  17. Wire chamber

    DOEpatents

    Atac, Muzaffer

    1989-01-01

    A wire chamber or proportional counter device, such as Geiger-Mueller tube or drift chamber, improved with a gas mixture providing a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor.

  18. Manually Operated Welding Wire Feeder

    NASA Technical Reports Server (NTRS)

    Rybicki, Daniel J. (Inventor)

    2001-01-01

    A manual welding wire feeder apparatus comprising a bendable elongate metal frame with a feed roller mounted at the center thereof for rotation about an axis transverse to the longitudinal axis of the frame. The frame ends are turned up as tabs and each provided with openings in alignment with each other and the mid-width center of the roller surface. The tab openings are sized to accommodate welding wire and each extends to a side edge of the tab, both opening on the same side of the frame, whereby welding wire can be side-loaded onto the frame. On the side of the frame, opposite the roller a lock ring handle is attached tangentially and is rotatable about the attachment point and an axis perpendicular to the frame. The device is grasped in the hand normally used to hold the wire. A finger is placed through the loop ring and the frame positioned across the palm and lower fingers. The thumb is positioned atop the wire so it can be moved from the back of the frame across the roller, and towards the front. In doing so, the wire is advanced at a steady rate in axial alignment with the tab openings and roller. To accommodate different wire diameters the frame is bendable about its center in the plane of the frame axis and wire so as to keep the wire in sufficient tension against the roller and to keep the wire fixed when the frame is tilted and thumb pressure released.

  19. Wire Wise.

    ERIC Educational Resources Information Center

    Swanquist, Barry

    1998-01-01

    Discusses how today's technology is encouraging schools to invest in furnishings that are adaptable to computer use and telecommunications access. Explores issues concerning modularity, wiring management, ergonomics, durability, price, and aesthetics. (GR)

  20. Method of preparing composite superconducting wire

    DOEpatents

    Verhoeven, John D.; Gibson, Edwin D.; Finnemore, Douglas K.; Ostenson, Jerome E.; Schmidt, Frederick A.; Owen, Charles V.

    1985-08-06

    An improved method of preparing composite multifilament superconducting wire of Nb.sub.3 Sn in a copper matrix which eliminates the necessity of coating the drawn wire with tin. A generalized cylindrical billet of an alloy of copper containing at least 15 weight percent niobium, present in the copper as discrete, randomly distributed and oriented dendritic-shaped particles, is provided with at least one longitudinal opening which is filled with tin to form a composite drawing rod. The drawing rod is then drawn to form a ductile composite multifilament wire containing a filament of tin. The ductile wire containing the tin can then be wound into magnet coils or other devices before heating to diffuse the tin through the wire to react with the niobium forming Nb.sub.3 Sn. Also described is an improved method for making large billets of the copper-niobium alloy by consumable-arc casting.

  1. Improved method of preparing composite superconducting wire

    DOEpatents

    Verhoeven, J.D.; Gibson, E.D.; Finnemore, D.K.; Ostenson, J.E.; Schmidt, F.A.; Owen, C.V.

    1979-10-17

    An improved method of preparing composite multifilament superconducting wire of Nb/sub 3/Sn in a copper matrix eliminates the necessity of coating the drawn wire with tin. A generalized cylindrical billet of an alloy of copper containing at least 15 weight percent niobium, present in the copper as discrete, randomly distributed and oriented dendritic-shaped particles, is provided with at least one longitudinal opening which is filled with tin to form a composite drawing rod. The drawing rod is then drawn to form a ductile composite multifilament wire containing a filament of tin. The ductile wire containing the tin can then be wound into magnet coils or other devices before heating to diffuse the tin through the wire to react with the niobium forming Nb/sub 3/Sn. Also described is an improved method for making large billets of the copper-niobium alloy by consumable-arc casting.

  2. Superconducting-wire fabrication. Final report

    SciTech Connect

    Glad, W.E.; Chase, G.G.

    1990-05-01

    Experiments were done leading to the fabrication of high-temperature superconducting composite wire. Bulk superconductor was characterized by using optical microscopy, scanning electron microscopy, and energy-dispersive x-ray spectroscopy. The chemical compatibility of superconducting materials with a number of metal sheathing candidates was tested, with silver offering the best compatibility. Wire was fabricated by drawing 0.250-inch-diameter silver tubing packed with superconducting powder. Single core wires were drawn to 0.037-inch diameter. The best critical current performance (660 A/cm2) for leaded bismuth 2-2-2-3 material was achieved by flattening single-core wire before heat treatment.

  3. Low carbon dual phase steels for high strength wire

    SciTech Connect

    Thomas, G.; Ahn, J.H.

    1985-08-01

    This paper shows that dual phase steels can be designed and processed as new, economical low carbon steels for cold drawing into high tensile strength steel wires. Current work indicates wires of tensile strengths up to 400,000 psi can be obtained. Potential applications for dual phase steel wire include bead wire, tire cord, wire rope and prestressed concrete. It should be possible to produce wire rods in existing rod mills by adapting the controlled rolling and quenching procedures outlined in this paper.

  4. Phosphorus in antique iron music wire.

    PubMed

    Goodway, M

    1987-05-22

    Harpsichords and other wire-strung musical instruments were made with longer strings about the beginning of the 17th century. This change required stronger music wire. Although these changes coincided with the introduction of the first mass-produced steel (iron alloyed with carbon), carbon was not found in samples of antique iron harpsichord wire. The wire contained an amount of phosphorus sufficient to have impeded its conversion to steel, and may have been drawn from iron rejected for this purpose. The method used to select pig iron for wire drawing ensured the highest possible phosphorus content at a time when its presence in iron was unsuspected. Phosphorus as an alloying element has had the reputation for making steel brittle when worked cold. Nevertheless, in replicating the antique wire, it was found that lowcarbon iron that contained 0.16 percent phosphorus was easily drawn to appropriate gauges and strengths for restringing antique harpsichords.

  5. Tensile deformation of NiTi wires.

    PubMed

    Gall, Ken; Tyber, Jeff; Brice, Valerie; Frick, Carl P; Maier, Hans J; Morgan, Neil

    2005-12-15

    We examine the structure and properties of cold drawn Ti-50.1 at % Ni and Ti-50.9 at % Ni shape memory alloy wires. Wires with both compositions possess a strong <111> fiber texture in the wire drawing direction, a grain size on the order of micrometers, and a high dislocation density. The more Ni rich wires contain fine second phase precipitates, while the wires with lower Ni content are relatively free of precipitates. The wire stress-strain response depends strongly on composition through operant deformation mechanisms, and cannot be explained based solely on measured differences in the transformation temperatures. We provide fundamental connections between the material structure, deformation mechanisms, and resulting stress-strain responses. The results help clarify some inconsistencies and common misconceptions in the literature. Ramifications on materials selection and design for emerging biomedical applications of NiTi shape memory alloys are discussed.

  6. Wiring for aerospace applications

    NASA Technical Reports Server (NTRS)

    Christian, J. L., Jr.; Dickman, J. E.; Bercaw, R. W.; Myers, I. T.; Hammoud, A. N.; Stavnes, M.; Evans, J.

    1992-01-01

    In this paper, the authors summarize the current state of knowledge of arc propagation in aerospace power wiring and efforts by the National Aeronautics and Space Administration (NASA) towards the understanding of the arc tracking phenomena in space environments. Recommendations will be made for additional testing. A database of the performance of commonly used insulating materials will be developed to support the design of advanced high power missions, such as Space Station Freedom and Lunar/Mars Exploration.

  7. Advanced oil recovery technologies for improved recovery from slope basin clastic reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM. Quarterly technical progress report, January 1--March 31, 1998

    SciTech Connect

    1998-04-30

    The overall objective of this project is to demonstrate that a development program--based on advanced reservoir management methods--can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the US oil and gas industry. Results obtained to date are summarized for the following: geostatistics and reservoir mapping; reservoir engineering; reservoir characterization/reservoir simulation; miscible recovery simulations; and technology transfer.

  8. Photocopy of drawing (this photograph is an 8" x 10" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1934 architectural drawing located at NAS Pensacola, Florida, Building No. 38-A) BLACKSMITH SHOP, BUILDING NO. 38-A, ELECTRIC LIGHTING, WIRING DIAGRAM AND PLAN - U.S. Naval Air Station, Blacksmith Shop, South Avenue, Pensacola, Escambia County, FL

  9. Foreshortening, convergence and drawings from a blind adult.

    PubMed

    Kennedy, John M; Juricevic, Igor

    2006-01-01

    Esref is a congenitally totally blind man, practiced in drawing. He was asked to draw solid and wire cubes situated in several places around his vantage point. He used foreshortening of receding sides and convergence of obliques, in approximate one-point perspective. We note that haptics provides information about the direction of objects--the basis of perspective.

  10. No Wires.

    ERIC Educational Resources Information Center

    DeLoughry, Thomas J.

    1995-01-01

    The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)

  11. Analysis of coils of wire rope arranged for passive damping

    NASA Technical Reports Server (NTRS)

    Cutchins, M. A.; Cochran, J. E., Jr.; Kumar, K.; Fitz-Coy, N. G.; Tinker, M. L.

    1988-01-01

    Vibration dampers constructed with multiple loops of wire rope are studied. The literature on such devices is reviewed briefly, and dynamic and static models of them are examined. Fundamental and advanced NASTRAN models for wire rope damping are considered.

  12. Corrosion of surface defects in fine wires.

    PubMed

    Rentler, R M; Greene, N D

    1975-11-01

    Defects were observed on the surfaces of various fine diameter wires commonly used in biomedical applications. These surface irregularities were viewed at high magnifications using a scanning electron microscope which has a much greater depth of field than normal light microscopy. Defects include scratches, pits, and crevices, which are the result of commercial wire drawing practices. Corrosion test results show that imperfections can serve as sites for localized corrosion attack which could lead to premature failures.

  13. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

    1992-08-11

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 figure.

  14. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, Eldon D.; Hooper, Frederick M.; Reichenbach, Marvin L.

    1992-01-01

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut.

  15. Improved Superconducting Wire for Wind Generators: Superconducting Wires for Direct-Drive Wind Generators

    SciTech Connect

    2012-01-01

    REACT Project: Brookhaven National Laboratory will develop a low-cost superconducting wire that could be used in high-power wind generators. Superconducting wire currently transports 600 times more electric current than a similarly sized copper wire, but is significantly more expensive. Brookhaven National Laboratory will develop a high-performance superconducting wire that can handle significantly more electrical current, and will demonstrate an advanced manufacturing process that has the potential to yield a several-fold reduction in wire costs while using a using negligible amount of rare earth material. This design has the potential to make a wind turbine generator lighter, more powerful, and more efficient, particularly for offshore applications.

  16. Residual stresses and durability in cold drawn eutectoid steel wires

    NASA Astrophysics Data System (ADS)

    Atienza, J. M.; Elices, M.; Ruiz-Hervias, J.; Caballero, L.; Valiente, A.

    2007-04-01

    Prestressing steel wires have excellent mechanical properties but there is a need to improve their durability in aggressive environments. In this work, the influence of residual stresses on the environmentally assisted cracking of these wires is studied. A good correlation has been found between residual stresses at the surface of the wires and the time to rupture during stress corrosion test proposed by the International Federation of Prestressing. Wires with the same microstructure, surface quality and mechanical properties show very different behaviour in aggressive environments depending on their residual stress state. Research shows that environmentally assisted cracking can be improved significantly by acting on the surface residual stresses produced by wire drawing. In addition, in this study a post-drawing treatment to generate compressive residual stresses at the surface of the wires is proposed.

  17. Soft magnetic wires

    NASA Astrophysics Data System (ADS)

    Vázquez, M.

    2001-06-01

    An overview of the present state of the art on the preparation techniques, outstanding magnetic properties and applications of soft magnetic micro and nanowires is presented. Rapid solidification techniques (in-rotating-water quenching and drawing methods) to fabricate amorphous microwires with diameter in the range from 100 down to 1 μm are first described. Electrodeposition is also employed to prepare composite microtubes (magnetic coatings) and to fill porous membranes (diameter of the order of 0.1 μm). Magnetic behaviours of interest are related to the different hysteresis loops of samples: square-shaped loops typical of bistable behaviour, and nearly non-hysteretic loop with well-defined transverse anisotropy field. The role played by magnetic dipolar interactions in the magnetic behaviour of arrays of micro and nanowires is described. A particular analysis is done on the giant magnetoimpedance (GMI) effect in the radio and microwave frequency ranges exhibited by ultrasoft microwires. Finally, a few examples of applications are introduced for magnetostrictive and non-magnetostrictive wires, they are: “magnetoelastic pens”, micromotors; DC current-sensors based on GMI, and sharpened amorphous wire tips in spin polarised scanning tunneling microscopy.

  18. Hot drawing of hardfacing alloys. Final report

    SciTech Connect

    Ohriner, E.K.

    1998-06-01

    The NOREM{trademark} iron-base hardfacing alloy provides outstanding resistance to galling (adhesive) wear and good corrosion resistance in diverse environments. However, because hardfacing alloys exhibit little ductility at room temperature, they are difficult to fabricate into wire. This EPRI project focused on hot drawing of a NOREM coil in an attempt to reduce its diameter to a sufficiently small value ({approximately} 0.062 in/1.6 mm) that it could be used as weld wire. Reduction of pieces of the coil from the starting diameter of {approximately} 0.25 in (6.4 mm) to {approximately} 0.08 in (2.0 mm) were achieved with a drawing schedule that decreased the diameter by {approximately} 15% at each step and provided intermediate annealing steps at {approximately} 1,100 C. Attempts to reduce the diameter further were largely unsuccessful for reasons that were difficult to pinpoint. This report describes the hot drawing process and an evaluation of swaging, which proved the only successful method of pointing the leading end of the wire so it could be placed through the die and gripped. This alloy was developed as a replacement for cobalt-base hardfacing alloys, particularly in nuclear plant valve applications.

  19. Wire Retrieves Broken Pin

    NASA Technical Reports Server (NTRS)

    Burow, G. H.

    1984-01-01

    Safety wire retains pieces of broken tool. Retrieval wire running through shaft of tool used to pull pieces of tool out of hole, should tool break during use. Safety wire concept suitable for pins subject to deflection or breakage.

  20. Advanced oil recovery technologies for improved recovery from slope basin clastic reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico. Annual report, September 25, 1995--September 24, 1996

    SciTech Connect

    Murphy, M.B.

    1997-08-01

    The basic driver for this project is the low recovery observed in Delaware reservoirs, such as the Nash Draw Pool (NDP). This low recovery is caused by low reservoir energy, less than optimum permeabilities and porosities, and inadequate reservoir characterization and reservoir management strategies which are typical of projects operated by independent producers. Rapid oil decline rates and high gas/oil ratios are typically observed in the first year of primary production. Based on the production characteristics that have been observed in similar Delaware fields, pressure maintenance is a likely requirement at the Nash Pool. Three basic constraints to producing the Nash Draw Brushy Canyon Reservoir are: (1) limited areal and interwell geologic knowledge, (2) lack of an engineering tool to evaluate the various producing strategies, and (3) limited surface access prohibiting development with conventional drilling. The limited surface access is caused by the proximity of underground potash mining and surface playa lakes. The objectives of this project are: (1) to demonstrate that a development drilling program and pressure maintenance program, based on advanced reservoir management methods, can significantly improve oil recovery compared with existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers, especially in the Permian Basin.

  1. Critical current density in wire drawn and hydrostatically extruded Nb-Ti superconductors

    NASA Technical Reports Server (NTRS)

    Alterovitz, S. A.; Woollam, J. A.; Collings, E. W.

    1979-01-01

    Critical current studies have been made on copper-clad Nb-Ti composite wire prepared under area reductions of 100:1 and 10,000:1 by hydrostatic extrusion (HE), wire drawing and HE plus drawing. Comparative evaluation of the thermomechanical processing equivalent of HE was performed.

  2. Children's Computer Drawings.

    ERIC Educational Resources Information Center

    Alexander, David

    Computer drawing programs have several characteristics that make them appropriate for use in early childhood education. Drawing at the computer is an activity that captures and holds children's attention. Children at all developmental levels of graphic ability can draw at the computer, and their products can be stored in a disc or printed for…

  3. HippoDraw

    SciTech Connect

    Gravina, M.F.; Kunz, P.F.; Rensing, P.E.

    1992-09-01

    HippoDraw is a NeXTSTEP application for viewing statistical data. It has several unique features which make viewing data distributions highly interactive. It also incorporates a set of simple drawing tools. HippoDraw is written in Objective-C and uses the Hippoplotamus library package to handle the n-tuples and displays.

  4. Generative Processes: Thick Drawing

    ERIC Educational Resources Information Center

    Wallick, Karl

    2012-01-01

    This article presents techniques and theories of generative drawing as a means for developing complex content in architecture design studios. Appending the word "generative" to drawing adds specificity to the most common representation tool and clarifies that such drawings are not singularly about communication or documentation but are…

  5. Automated wire preparation system

    NASA Astrophysics Data System (ADS)

    McCulley, Deborah J.

    The first step toward an automated wire harness facility for the aerospace industry has been taken by implementing the Wire Vektor 2000 into the wire harness preparation area. An overview of the Wire Vektor 2000 is given, including the facilities for wire cutting, marking, and transporting, for wire end processing, and for system control. Production integration in the Wire Vektor 2000 system is addressed, considering the hardware/software debug system and the system throughput. The manufacturing changes that have to be made in implementing the Wire Vektor 2000 are discussed.

  6. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. Trolley wires, trolley feeder wires, and bare signal wires shall be...

  7. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. Trolley wires, trolley feeder wires, and bare signal wires shall be...

  8. Windows: Life after Wire.

    ERIC Educational Resources Information Center

    Razwick, Jerry

    2003-01-01

    Although wired glass is extremely common in school buildings, the International Building Code adopted new standards that eliminate the use of traditional wired glass in K-12 schools, daycare centers, and athletic facilities. Wired glass breaks easily, and the wires can cause significant injuries by forming dangerous snags when the glass breaks.…

  9. Automatic wire twister.

    PubMed

    Smith, J F; Rodeheaver, G T; Thacker, J G; Morgan, R F; Chang, D E; Fariss, B L; Edlich, R F

    1988-06-01

    This automatic wire twister used in surgery consists of a 6-inch needle holder attached to a twisting mechanism. The major advantage of this device is that it twists wires significantly more rapidly than the conventional manual techniques. Testing has found that the ultimate force required to disrupt the wires twisted by either the automatic wire twister or manual techniques did not differ significantly and was directly related to the number of twists. The automatic wire twister reduces the time needed for wire twisting without altering the security of the twisted wire.

  10. Stretched Wire Mechanics

    SciTech Connect

    Bowden, Gordon; /SLAC

    2005-09-06

    Stretched wires are beginning to play an important role in the alignment of accelerators and synchrotron light sources. Stretched wires are proposed for the alignment of the 130 meter long LCLS undulator. Wire position technology has reached sub-micron resolution yet analyses of perturbations to wire straightness are hard to find. This paper considers possible deviations of stretched wire from the simple 2-dimensional catenary form.

  11. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, James W.

    1994-01-01

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  12. Understanding Children's Drawings.

    ERIC Educational Resources Information Center

    Malchiodi, Cathy A.

    Children's art not only provides a window to children's problems, it also gives them another language with which to share feelings and ideas. This book provides an overview of the multidimensional aspects of children's drawings, and is intended to assist therapists in working with children and their drawings. Chapter 1 discusses projective tests…

  13. Photographic copy of architectural drawing (original located at the Panama ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama), 1916. Second floor wiring plan - Balboa School, Northeast end of El Prado, Balboa, Former Panama Canal Zone, CZ

  14. 51. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN, MECHANICAL FAN ROOM LAYOUT, ELECTRICAL WIRING DIAGRAM, RADIATOR, FANS 1 & 2, DETAILS; SHEET NO. 202 OF 3 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  15. Wire Test Grip Fixture

    NASA Technical Reports Server (NTRS)

    Burke, Christopher S.

    2011-01-01

    Wire-testing issues, such as the gripping strains imposed on the wire, play a critical role in obtaining clean data. In a standard test frame fitted with flat wedge grips, the gripping action alone creates stresses on the wire specimen that cause the wire to fail at the grip location. A new test frame, which is outfitted with a vacuum chamber, negated the use of any conventional commercially available wire test fixtures, as only 7 in. (17.8 cm) existed between the grip faces. An innovative grip fixture was designed to test thin gauge wire for a variety of applications in an existing Instron test frame outfitted with a vacuum chamber.

  16. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1999-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 degree C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire (2) bundle of 15 or more wires (3) 70 C environment (4) vacuum of 10(exp -5) torr or less To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  17. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire; (2) bundle of 15 or more wires; (3) 70 C environment: and (4) vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  18. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  19. Wire harness twisting aid

    NASA Technical Reports Server (NTRS)

    Casey, E. J.; Commadore, C. C.; Ingles, M. E.

    1980-01-01

    Long wire bundles twist into uniform spiral harnesses with help of simple apparatus. Wires pass through spacers and through hand-held tool with hole for each wire. Ends are attached to low speed bench motor. As motor turns, operator moves hand tool away forming smooth twists in wires between motor and tool. Technique produces harnesses that generate less radio-frequency interference than do irregularly twisted cables.

  20. EMF wire code research

    SciTech Connect

    Jones, T.

    1993-11-01

    This paper examines the results of previous wire code research to determines the relationship with childhood cancer, wire codes and electromagnetic fields. The paper suggests that, in the original Savitz study, biases toward producing a false positive association between high wire codes and childhood cancer were created by the selection procedure.

  1. Flicking-wire drag tensioner

    NASA Technical Reports Server (NTRS)

    Dassele, M. A.; Fairall, H.

    1978-01-01

    Wire-drag system improves wire profile and applies consistent drag to wire. Wire drag is continuously adjustable from zero drag to tensile strength of wire. No-sag wire drag is easier to thread than former system and requires minimal downtime for cleaning and maintenance.

  2. Making Sense of Children's Drawings

    ERIC Educational Resources Information Center

    Anning, Angela; Ring, Kathy

    2004-01-01

    This book explores how young children learn to draw and draw to learn, at home and school. It provides support for practitioners in developing a pedagogy of drawing in Art and Design and across the curriculum and provide advice for parents about how to make sense of their children's drawings. This book is enlivened with the real drawings of seven…

  3. Process for producing fine and ultrafine filament superconductor wire

    DOEpatents

    Kanithi, Hem C.

    1992-01-01

    A process for producing a superconductor wire made up of a large number of round monofilament rods is provided for, comprising assembling a multiplicity of round monofilaments inside each of a multiplicity of thin wall hexagonal tubes and then assembling a number of said thin wall hexagonal tubes within an extrusion can and subsequently consolidating, extruding and drawing the entire assembly down to the desired wire size.

  4. Process for producing fine and ultrafine filament superconductor wire

    DOEpatents

    Kanithi, H.C.

    1992-02-18

    A process for producing a superconductor wire made up of a large number of round monofilament rods is provided for, comprising assembling a multiplicity of round monofilaments inside each of a multiplicity of thin wall hexagonal tubes and then assembling a number of said thin wall hexagonal tubes within an extrusion can and subsequently consolidating, extruding and drawing the entire assembly down to the desired wire size. 8 figs.

  5. Selected developments in laser wire stripping. [cutting insulation from aerospace-type wires and cables

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The operation of mechanical and thermal strippers and the early development of laser wire strippers are reviewed. NASA sponsored development of laser wire stripping for space shuttle includes bench-type strippers as well as an advanced portable hand-held stripper which incorporates a miniaturized carbon dioxide laser and a rotating optics unit with a gas-jet assist and debris exhaust. Drives and controls girdle the wire and slit the remaining slug without manual assistance. This unit can strip wire sizes 26 through 12 gage. A larger-capacity hand-held unit for wire sizes through 1/0 gage was built using a neodynium-doped yttrium aluminum garnet (Nd:YAG) laser. The hand-held units have a flexible umbilical cable to an accompanying cart that carries the power supply, gas supply, cooling unit, and the controls.

  6. Third NASA Workshop on Wiring for Space Applications

    NASA Technical Reports Server (NTRS)

    Hammoud, Ahmad (Compiler); Stavnes, Mark (Compiler)

    1995-01-01

    This workshop addressed key technology issues in the field of electrical power wiring for space applications, and transferred information and technology related to space wiring for use in government and commercial applications. Speakers from space agencies, U.S. Federal labs, industry, and academia presented program overviews and discussed topics on arc tracking phenomena, advancements in insulation materials and constructions, and new wiring system topologies.

  7. Base Information Transport Infrastructure Wired (BITI Wired)

    DTIC Science & Technology

    2016-03-01

    Information Retrieval (DAMIR) UNCLASSIFIED BITI Wired 2016 MAR UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for MAIS...Major Automated Information System MAIS OE - MAIS Original Estimate MAR – MAIS Annual Report MDA - Milestone Decision Authority MDD - Materiel...Then Year U.S.C- United States Code USD(AT&L) - Under Secretary of Defense for Acquisition, Technology, & Logistics BITI Wired 2016 MAR

  8. An interactive wire-wrap board layout program

    NASA Technical Reports Server (NTRS)

    Schlutsmeyer, A.

    1987-01-01

    An interactive computer-graphics-based tool for specifying the placement of electronic parts on a wire-wrap circuit board is presented. Input is a data file (currently produced by a commercial logic design system) which describes the parts used and their interconnections. Output includes printed reports describing the parts and wire paths, parts counts, placement lists, board drawing, and a tape to send to the wire-wrap vendor. The program should reduce the engineer's layout time by a factor of 3 to 5 as compared to manual methods.

  9. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) TYPICAL SECTION AND ELEVATION DRAWINGS FOR FRONT ENTRANCES, REAR ENTRANCES, WINDOWS AND SHELTER STRUCTURES. DRAWING NO. A-20. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  10. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  11. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  12. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  13. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare..., and bare signal wires shall be adequately guarded: (a) At all points where men are required to work...

  14. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare..., and bare signal wires shall be adequately guarded: (a) At all points where men are required to work...

  15. Drawing inside the Box

    ERIC Educational Resources Information Center

    Franklin, Ranella

    2007-01-01

    When working with very young children and/or students with special needs, it is beneficial for teachers to think "outside the box" in order to preserve and enhance a child's natural curiosity. In an effort to teach young children to control their drawing tools, they are often presented with coloring book-type pages and instructed to "stay inside…

  16. Drawing with Picasso

    ERIC Educational Resources Information Center

    Hubbert, Beth

    2012-01-01

    In this article, the author describes how her third-grade art students made linear face drawings. Inspired by Pablo Picasso, an artist who tried to maintain the quality of child-like art, the students invented their own abstract line faces true to Picasso's artistic intentions. (Contains 1 online resource.)

  17. Thin wire pointing method

    NASA Technical Reports Server (NTRS)

    Green, G.; Mattauch, R. J. (Inventor)

    1983-01-01

    A method is described for forming sharp tips on thin wires, in particular phosphor bronze wires of diameters such as one-thousandth inch used to contact micron size Schottky barrier diodes, which enables close control of tip shape and which avoids the use of highly toxic solutions. The method includes dipping an end of a phosphor bronze wire into a dilute solution of sulfamic acid and applying a current through the wire to electrochemically etch it. The humidity in the room is controlled to a level of less than 50%, and the voltage applied between the wire and another electrode in the solutions is a half wave rectified voltage. The current through the wire is monitored, and the process is stopped when the current falls to a predetermined low level.

  18. Variations in the Magnetic Torque Acting on a Wire

    ERIC Educational Resources Information Center

    Bonati, Claudio

    2012-01-01

    The relation M = [mu] x B is presented in all elementary courses on electromagnetism, but it is usually given just for the simple case of a rectangular wire. We will present a completely general but elementary proof of this relation together with two more advanced proof methods. We will then provide some extensions: non-closed wires and…

  19. Sintered wire annode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2007-12-25

    A plurality of high atomic number wires are sintered together to form a porous rod that is parted into porous disks which will be used as x-ray targets. A thermally conductive material is introduced into the pores of the rod, and when a stream of electrons impinges on the sintered wire target and generates x-rays, the heat generated by the impinging x-rays is removed by the thermally conductive material interspersed in the pores of the wires.

  20. Wire-inhomogeneity detector

    DOEpatents

    Gibson, G.H.; Smits, R.G.; Eberhard, P.H.

    1982-08-31

    A device for uncovering imperfections in electrical conducting wire, particularly superconducting wire, by detecting variations in eddy currents. Eddy currents effect the magnetic field in a gap of an inductor, contained in a modified commercial ferrite core, through which the wire being tested is passed. A small increase or decrease in the amount of conductive material, such as copper, in a fixed cross section of wire will unbalance a bridge used to measure the impedance of the inductor, tripping a detector and sounding an alarm.

  1. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, J.W.

    1994-05-31

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface is disclosed. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest. 4 figs.

  2. Weld Wire Investigation Summary

    SciTech Connect

    Cunningham, M.A.

    1999-03-22

    After GTA welding reservoir A production/process prove-in assemblies, X-ray examination detected a lack of sidewall fusion. After examining several possible causes, it was determined that the weld wire filler metal was responsible, particularly the wire cleaning process. The final conclusion was that the filler wire must be abrasively cleaned in a particular manner to perform as required. The abrasive process was incorporated into the wire material specification, ensuring consistency for all reservoir GTA welding at AlliedSignal Federal Manufacturing and Technologies (FM and T).

  3. 1998 wire development workshop proceedings

    SciTech Connect

    1998-04-01

    This report consists of vugraphs of the presentations at the conference. The conference was divided into the following sessions: (1) First Generation Wire Development: Status and Issues; (2) First Generation Wire in Pre-Commercial Prototypes; (3) Second Generation Wire Development: Private Sector Progress and Issues; (4) Second Generation Wire Development: Federal Laboratories; and (5) Fundamental Research Issues for HTS Wire Development.

  4. Wire Array Photovoltaics

    NASA Astrophysics Data System (ADS)

    Turner-Evans, Dan

    Over the past five years, the cost of solar panels has dropped drastically and, in concert, the number of installed modules has risen exponentially. However, solar electricity is still more than twice as expensive as electricity from a natural gas plant. Fortunately, wire array solar cells have emerged as a promising technology for further lowering the cost of solar. Si wire array solar cells are formed with a unique, low cost growth method and use 100 times less material than conventional Si cells. The wires can be embedded in a transparent, flexible polymer to create a free-standing array that can be rolled up for easy installation in a variety of form factors. Furthermore, by incorporating multijunctions into the wire morphology, higher efficiencies can be achieved while taking advantage of the unique defect relaxation pathways afforded by the 3D wire geometry. The work in this thesis shepherded Si wires from undoped arrays to flexible, functional large area devices and laid the groundwork for multijunction wire array cells. Fabrication techniques were developed to turn intrinsic Si wires into full p-n junctions and the wires were passivated with a-Si:H and a-SiNx:H. Single wire devices yielded open circuit voltages of 600 mV and efficiencies of 9%. The arrays were then embedded in a polymer and contacted with a transparent, flexible, Ni nanoparticle and Ag nanowire top contact. The contact connected >99% of the wires in parallel and yielded flexible, substrate free solar cells featuring hundreds of thousands of wires. Building on the success of the Si wire arrays, GaP was epitaxially grown on the material to create heterostructures for photoelectrochemistry. These cells were limited by low absorption in the GaP due to its indirect bandgap, and poor current collection due to a diffusion length of only 80 nm. However, GaAsP on SiGe offers a superior combination of materials, and wire architectures based on these semiconductors were investigated for multijunction

  5. Durability to Electromigration of an Annealing-Twinned Ag-4Pd Alloy Wire Under Current Stressing

    NASA Astrophysics Data System (ADS)

    Chuang, Tung-Han; Lin, Hsin-Jung; Chuang, Chien-Hsun; Tsai, Chih-Hsin; Lee, Jun-Der; Tsai, Hsing-Hua

    2014-11-01

    Ag-4Pd binary alloy wire has been produced as an alternative to a previously developed Ag-8Au-3Pd ternary alloy wire to meet requirements for high electrical conductivity and low cost. The electrical resistivity of this Ag-4Pd bonding wire, manufactured with a conventional method, is 3.7 μΩ cm, close to the values of traditional 3N Au wire (3.5 μΩ cm) and Pd-coated Cu wire (1.8 μΩ cm). To further improve the performance of this bonding wire, a large amount of annealing twins were introduced in this Ag-4Pd alloy wire through an innovative concept of sequential drawing and multiple annealing processes. The resulting electrical resistivity of this annealing-twinned Ag-4Pd wire is 3.5 μΩ cm. In contrast to the apparent increase in grain size in the conventional Ag-4Pd wire under electrical stressing with a current density of 1.23 × 105 A/cm2 for various times, the grains in this annealing-twinned wire grow much more slowly. The breaking load and elongation of this annealing-twinned Ag-4Pd wire are also higher than those of conventional wire. Furthermore, annealing twins increase the durability to electromigration of this Ag-4Pd wire under electrical stressing with various current densities.

  6. Manufacturing and quality control of interconnecting wire harnesses, Volume 2

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Interconnecting wire harnesses defined in the design standard are considered, including type 4, open bundle (not enclosed). Knowledge gained through experience on the Saturn 5 program coupled with recent advances in techniques, materials, and processes was incorporated into the document.

  7. Imagination Visualized in Wire.

    ERIC Educational Resources Information Center

    Skophammer, Karen

    2003-01-01

    Describes an art lesson achieved with a Very Special Artist (VSA) in residence for sixth- and seventh-grade students in which they created wire sculptures. Discusses how the VSA taught the students. Includes a list of art materials and characteristics of wire. (CMK)

  8. Commercial and Industrial Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; Flowers, Gary

    This module is the third in a series of three wiring publications, includes additional technical knowledge and applications required for job entry in the commercial and industrial wiring trade. The module contains 15 instructional units that cover the following topics: blueprint reading and load calculations; tools and equipment; service;…

  9. [Central venous catheterization complication by a guide wire].

    PubMed

    Araki, Yoshiyuki; Fukuda, Isao; Hirano, Masato; Matsuoka, Nobuhiro; Kazama, Tomiei

    2009-03-01

    Central venous catheterization using the Seldinger technique is a well known and often used method. On the other hand, there are also well known complications by needle puncture or by indwelling catheter, there are few reports about a guide wire which got hung up around the tricuspid valve. We report a case in which a guide wire got hung up to the chordae tendineae of the tricuspid valve. To insert the AVA 3Xi (Edwards life science Co. Iervine) from the right internal jugular vein, we inserted a guide wire without ease. Resistance appeared when we tried to remove the wire for 20 cm from the inserted state. The X-ray and the transesophageal echocardiography, showed the guide wire in the right ventricle. As actions to be taken, we advanced the central vein catheter of the EXCV catheter kit (Nippon Sherwood Medical Industries Co., Ltd.) to the tip, and a the guide wire was easily removed. There are many reports of the complication by the central venepuncture, but there are few reports about the guide wire which was entrapped in the vicinity of a tricuspid valve. The tip of the guide wire in this case was bent excessively, but the cause of the damage did not become clear by investigation. When a guide wire became hard to withdraw, we should never withdraw a guide wire blindly, but should search a cause and we should use the material which was matched with the cause.

  10. Interactive wire-frame ship hullform generation and display

    NASA Technical Reports Server (NTRS)

    Calkins, D. E.; Garbini, J. L.; Ishimaru, J.

    1984-01-01

    An interactive automated procedure to generate a wire frame graphic image of a ship hullform, which uses a digitizing tablet in conjunction with the hullform lines drawing, was developed. The geometric image created is displayed on an Evans & Sutherland PS-300 graphics terminal for real time interactive viewing or is output as hard copy on an inexpensive dot matrix printer.

  11. 9. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). July, 1960. 4BOOQ002. QUADRANT MAP - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  12. 180. Photocopy of drawing (1965 mechanical drawing by Koebig & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    180. Photocopy of drawing (1965 mechanical drawing by Koebig & Koebig, Inc.) AIR CONDITIONING FOR THE MST, SHEET M-6 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. 37. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). May, 1986. UNIVERSITY OF CALIFORNIA TOPOGRAPHIC MAP - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  14. 254. Photocopy of drawing (1975 structural drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    254. Photocopy of drawing (1975 structural drawing by the Ralph M. Parsons Company) FLAME DEFLECTOR FOR LAUNCHER, SHEET S-17 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 2. Photocopy of measured drawing (original drawing in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photocopy of measured drawing (original drawing in the possession of Beinecke Rare Books Library, Yale University) Henry Austin, architect, 1850 NORTHEAST ELEVATION - Moses Yale Beach House, 86 North Main Street, Wallingford, New Haven County, CT

  16. 1. Photocopy of measured drawing (original drawing in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of measured drawing (original drawing in the possession of Beinecke Rare Books Library, Yale University) Henry Austin, architect, 1850 SOUTHEAST (FRONT) ELEVATION - Moses Yale Beach House, 86 North Main Street, Wallingford, New Haven County, CT

  17. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama), 1916. Side elevation - Balboa School, Northeast end of El Prado, Balboa, Former Panama Canal Zone, CZ

  18. 5. Photocopy of measured drawing (original drawing in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of measured drawing (original drawing in the possession of the Rigsarkivet (Royal Archives), Copenhagen, Denmark) Lieutenant Giellerup, delineator, May 1829 PLAN PROPOSED ALTERATIONS OF SECOND FLOOR OF GOVERNMENT HOUSE - Government House, King Street, Christiansted, St. Croix, VI

  19. 4. Photocopy of measured drawing (original drawing in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of measured drawing (original drawing in the possession of the Rigsarkivet (Royal Archives), Copenhagen, Denmark) Lieutenant Giellerup, delineator, May 1829 PROPOSED ALTERATIONS OF GOVERNMENT HOUSE - Government House, King Street, Christiansted, St. Croix, VI

  20. 6. Photocopy of measured drawing (original drawing in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of measured drawing (original drawing in the possession of the Rigsarkivet (Royal Archives), Copenhagen, Denmark) Ludvig Schellerup, architect, August 1864 PLAN OF GOVERNMENT HOUSE - Government House, King Street, Christiansted, St. Croix, VI

  1. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. Ground floor plan. - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  2. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. Exterior Details - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  3. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1941. First floor plan - Fort Amador, Four Apartments, Van Hook Place, Panama City, Former Panama Canal Zone, CZ

  4. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. Second floor plan. - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  5. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. Exterior details - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  6. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Rodman, Republic or Panama), 1940. Elevations. - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  7. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. First floor plan. - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  8. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940) Toilet plans - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  9. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. Details of toilets - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  10. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1941. Basement floor plan. - Fort Amador, Four Apartments, Van Hook Place, Panama City, Former Panama Canal Zone, CZ

  11. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1940. Sections - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  12. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1941. Elevation and section - Fort Amador, Four Apartments, Van Hook Place, Panama City, Former Panama Canal Zone, CZ

  13. 28. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photocopy of drawing, Draw for L Street Bridge, Sheet 6: Girder C, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  14. 26. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photocopy of drawing, Draw for L Street Bridge, Sheet 4: Girder D, Girder F, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  15. 29. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photocopy of drawing, Draw for L Street Bridge, Sheet 7: Girder D, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  16. 31. Photocopy of drawing, Draws for L Street Bridge, Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of drawing, Draws for L Street Bridge, Main Trucks, August 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  17. 25. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopy of drawing, Draw for L Street Bridge, Sheet 3: Girder A, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  18. 23. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of drawing, Draw for L Street Bridge, Sheet 1: Plan and Elevation, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  19. 30. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photocopy of drawing, Draw for L Street Bridge, Sheet 8: Samson Posts, Truck Rockers, Portal Struts, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  20. 24. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photocopy of drawing, Draw for L Street Bridge, Sheet 2: Floor Beams, July 1982. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  1. 27. Photocopy of drawing, Draw for L Street Bridge, Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photocopy of drawing, Draw for L Street Bridge, Sheet 5: Girder E, July 1892. City of Boston Public Works Department Bridge files. - Summer Street Bridge, Spanning Reserved Channel, Boston, Suffolk County, MA

  2. 86. Photocopy of drawing (February 1994 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    86. Photocopy of drawing (February 1994 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, George). Rich's Department Store, Atlanta, Georgia, ground floor plan 1924 building. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  3. 5. Photograph of extant ink on linen drawings (original drawings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photograph of extant ink on linen drawings (original drawings held in the vault of the Office of the State Architect in Sacramento) FIRST FLOOR FRAMING PLAN, AUGUST 1922 - California State Printing Office, 1020 O Street, Sacramento, Sacramento County, CA

  4. 6. Photograph of extant ink on linen drawings (original drawings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photograph of extant ink on linen drawings (original drawings held in the vault of the Office of the State Architect in Sacramento) SECOND FLOOR FRAMING PLAN, AUGUST 1922 - California State Printing Office, 1020 O Street, Sacramento, Sacramento County, CA

  5. 18. Photograph of Original Drawing of Revolving Car Dumper, Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photograph of Original Drawing of Revolving Car Dumper, Drawing No. 9-22, dated 4/19/56 (original in possession of CSX Transportation, Inc.) - Port Covington Terminal, Coal Pier No. 4, Baltimore, Independent City, MD

  6. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). Left side elevation. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  7. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). Rear elevation. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  8. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). Longitudinal section. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  9. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). Second floor plan. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  10. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). Front elevation. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  11. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). First floor plan. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  12. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama), Right side elevation. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  13. 20. Photocopy of drawing (1961 mechanical drawing by Kaiser Engineers) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of drawing (1961 mechanical drawing by Kaiser Engineers) ELECTRICAL LAYOUTS FOR VEHICLE SUPPORT BUILDING, SHEET E-2 - Vandenberg Air Force Base, Space Launch Complex 3, Vehicle Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 19. Photocopy of drawing (1961 piping drawing by Kaiser Engineers) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of drawing (1961 piping drawing by Kaiser Engineers) PIPING PLANS AND DETAILS FOR VEHICLE SUPPORT BUILDING, SHEET P-1 - Vandenberg Air Force Base, Space Launch Complex 3, Vehicle Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 110. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    110. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Drawings for the first addition to Annex B. This drawing excerpted from blueprint set. SOUTH ELEVATION (ANNEX B, BAYS P AND Q, FOR FLOORS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  16. 93. Photographic copy of drawing (February 1905, original drawing in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    93. Photographic copy of drawing (February 1905, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Partial elevation drawing of the first four bays west of Homan Avenue. This drawing is excerpted from a blueprint set. NORTH ELEVATION - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  17. 15. Photocopy of drawing (1958 architectural drawing by Ralph M. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of drawing (1958 architectural drawing by Ralph M. Parsons Company. Original drawing in possession of Vandenberg Air Force Base Civil Engineering Office). SITE PLAN FOR POINT ARGUELLO LAUNCH COMPLEX 1 (SLC-3) SHOWING POTENTIAL SITES OF FUTURE PADS. - Vandenberg Air Force Base, Space Launch Complex 3, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 23. Photographic copy of construction drawing 1985 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of construction drawing 1985 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevation drawings of nose dock nos. 491, 492, and 493. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  19. Photocopy of drawing (original drawing of Fire and Guard House ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Fire and Guard House with Communication Center in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) ELEVATIONS AND SECTIONS - MacDill Air Force Base, Fire & Guard House, 2709 Florida Keys Avenue, Tampa, Hillsborough County, FL

  20. Photocopy of drawing (original drawing of Fire and Guard House ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Fire and Guard House with Communication Center in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FRONT ELEVATION DETAILS - MacDill Air Force Base, Fire & Guard House, 2709 Florida Keys Avenue, Tampa, Hillsborough County, FL

  1. Photocopy of drawing (original drawing of Fire and Guard House ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Fire and Guard House with Communication Center in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST AND SECOND FLOOR AND ROOF PLANS - MacDill Air Force Base, Fire & Guard House, 2709 Florida Keys Avenue, Tampa, Hillsborough County, FL

  2. Photocopy of drawing (original drawing of Fire and Guard House ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Fire and Guard House with Communication Center in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) EXTERIOR AND MISCELLANEOUS DETAILS - MacDill Air Force Base, Fire & Guard House, 2709 Florida Keys Avenue, Tampa, Hillsborough County, FL

  3. 107. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/2 inch to one foot. Large scale drawings of elevation details. DETAIL ELEVATIONS - ANNEX A AND ANNEX B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  4. 18. Photocopy of drawing (May 24, 1939 architectural drawing by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of drawing (May 24, 1939 architectural drawing by Heintz, Adler & Schutze, in possession of the Atlanta Housing Authority). Floor plans, Type A, D and H buildings. Drawing No. A-20. - Clark Howell Homes, Building 12-B, 516 Lovejoy Street, Atlanta, Fulton County, GA

  5. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) TYPICAL TYPE "A" AND TYPE "C" APARTMENT UNIT STAIRWELL DRAWINGS, SECTIONS AND ELEVATIONS. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  6. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) PLOT PLANS SHOWING STREETS AND SIDEWALKS. DRAWING NO. A-2. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  7. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) FLOOR PLANS, TYPE "A" AND "B" APARTMENTS. DRAWING NO. A-52 - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  8. Photocopy of drawing (September, 1935 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (September, 1935 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) TITLE SHEET. DRAWING NO. H.D. 96 - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  9. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) WINDOW, DOOR, AND INTERIOR FINISH SCHEDULES. DRAWING NO. A-56 - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  10. Photocopy of drawing (original drawing of War Department Theater in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of War Department Theater in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FLOOR PLAN AND BENCH DETAILS - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL

  11. Photocopy of drawing (original drawing of War Department Theater in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of War Department Theater in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) EXTERIOR ELEVATIONS - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL

  12. Photocopy of drawing (original drawing of War Department Theater in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of War Department Theater in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST FLOOR AND CEILING PLAN - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL

  13. Photocopy of drawing (original drawing of War Department Theater in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of War Department Theater in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General)STRUCTURAL - FOUNDATIONS - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL

  14. 89. Photocopy of drawing (October 1950 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    89. Photocopy of drawing (October 1950 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Front elevation (Broad Street), additions and alterations to Rich's Inc., drawing no. A-6. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  15. 94. Photocopy of drawing (December 1960 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    94. Photocopy of drawing (December 1960 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Second floor plan, parking garage for Rich's Inc., drawing no. A4-14. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  16. 88. Photocopy of drawing (October 1950 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    88. Photocopy of drawing (October 1950 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). First floor plan, additions and alterations to Rich's Inc., drawing no. A-3. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  17. 98. Photocopy of drawing (February 1962 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    98. Photocopy of drawing (February 1962 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Floor plans, elevations, door types, door details, Rich's downtown garden addition, drawing no. A-1. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  18. 90. Photocopy of drawing (October 1950 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    90. Photocopy of drawing (October 1950 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Cross section B-B, additions and alterations to Rich's Inc., drawing no. A-8. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  19. 95. Photocopy of drawing (December 1960 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    95. Photocopy of drawing (December 1960 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkins, Atlanta, Georgia). Elevators, parking garage for Rich's, Inc., drawing no. A9-14. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  20. 97. Photocopy of drawing (December 1962 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    97. Photocopy of drawing (December 1962 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). First floor plan (and site plan), parking garage addition for Rich's Inc., drawing no. A2-8. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  1. 92. Photocopy of drawing (April 1951 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    92. Photocopy of drawing (April 1951 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Fifth floor plan, additions and alterations to Rich's, Inc., drawing no. A-24. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  2. 91. Photocopy of drawing (October 1950 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    91. Photocopy of drawing (October 1950 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Broad Street entrance and stairs, additions and alterations to Rich's Inc., drawing no. A-10. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  3. 96. Photocopy of drawing (December 1960 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    96. Photocopy of drawing (December 1960 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Sections and elevations, parking garage for Rich's Inc., drawing no. A10-14. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  4. 93. Photocopy of drawing (December 1960 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    93. Photocopy of drawing (December 1960 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). First floor plan, parking garage for Rich's Inc., drawing no. A3-14. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  5. 87. Photocopy of drawing (October 1950 architectural drawing by Stevens ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    87. Photocopy of drawing (October 1950 architectural drawing by Stevens & Wilkinson, original in possession of Stevens & Wilkinson, Atlanta, Georgia). Basement floor plan, additions and alterations to Rich's, Inc., drawing no. !-2. - Rich's Downtown Department Store, 45 Broad Street, Atlanta, Fulton County, GA

  6. 95. Photographic copy of drawing (February 1905, original drawing in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    95. Photographic copy of drawing (February 1905, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Main elevation along Homan Avenue, including the tower. This drawing is excerpted from a blueprint set. EAST ELEVATION - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  7. Photocopy of drawing (original drawing of Fire and Guard House ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Fire and Guard House with Communication Center in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) CELL BLOCK DETAILS - MacDill Air Force Base, Fire & Guard House, 2709 Florida Keys Avenue, Tampa, Hillsborough County, FL

  8. Photocopy of drawing (original drawing of Sewage Treatment Plant ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Sewage Treatment Plant - No. 1 Pump House in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) ELEVATIONS, SECTIONS, AND DETAILS - MacDill Air Force Base, Pump House No. 1, Hillsborough Garden Drive & Tampa Boulevard, Tampa, Hillsborough County, FL

  9. Photocopy of drawing (original drawing of Sewage Treatment Plant ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Sewage Treatment Plant - No. 1 Pump House in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FLOOR PLANS AND SECTIONS - MacDill Air Force Base, Pump House No. 1, Hillsborough Garden Drive & Tampa Boulevard, Tampa, Hillsborough County, FL

  10. Fabricating metamaterials using the fiber drawing method.

    PubMed

    Tuniz, Alessandro; Lwin, Richard; Argyros, Alexander; Fleming, Simon C; Kuhlmey, Boris T

    2012-10-18

    Metamaterials are man-made composite materials, fabricated by assembling components much smaller than the wavelength at which they operate (1). They owe their electromagnetic properties to the structure of their constituents, instead of the atoms that compose them. For example, sub-wavelength metal wires can be arranged to possess an effective electric permittivity that is either positive or negative at a given frequency, in contrast to the metals themselves (2). This unprecedented control over the behaviour of light can potentially lead to a number of novel devices, such as invisibility cloaks (3), negative refractive index materials (4), and lenses that resolve objects below the diffraction limit (5). However, metamaterials operating at optical, mid-infrared and terahertz frequencies are conventionally made using nano- and micro-fabrication techniques that are expensive and produce samples that are at most a few centimetres in size (6-7). Here we present a fabrication method to produce hundreds of meters of metal wire metamaterials in fiber form, which exhibit a terahertz plasmonic response (8). We combine the stack-and-draw technique used to produce microstructured polymer optical fiber (9) with the Taylor-wire process (10), using indium wires inside polymethylmethacrylate (PMMA) tubes. PMMA is chosen because it is an easy to handle, drawable dielectric with suitable optical properties in the terahertz region; indium because it has a melting temperature of 156.6 °C which is appropriate for codrawing with PMMA. We include an indium wire of 1 mm diameter and 99.99% purity in a PMMA tube with 1 mm inner diameter (ID) and 12 mm outside diameter (OD) which is sealed at one end. The tube is evacuated and drawn down to an outer diameter of 1.2 mm. The resulting fiber is then cut into smaller pieces, and stacked into a larger PMMA tube. This stack is sealed at one end and fed into a furnace while being rapidly drawn, reducing the diameter of the structure by a factor

  11. Online dynamic graph drawing.

    PubMed

    Frishman, Yaniv; Tal, Ayellet

    2008-01-01

    This paper presents an algorithm for drawing a sequence of graphs online. The algorithm strives to maintain the global structure of the graph and thus the user's mental map, while allowing arbitrary modifications between consecutive layouts. The algorithm works online and uses various execution culling methods in order to reduce the layout time and handle large dynamic graphs. Techniques for representing graphs on the GPU allow a speedup by a factor of up to 17 compared to the CPU implementation. The scalability of the algorithm across GPU generations is demonstrated. Applications of the algorithm to the visualization of discussion threads in Internet sites and to the visualization of social networks are provided.

  12. Next Generation Wiring

    NASA Technical Reports Server (NTRS)

    Medelius, Petro; Jolley, Scott; Fitzpatrick, Lilliana; Vinje, Rubiela; Williams, Martha; Clayton, LaNetra; Roberson, Luke; Smith, Trent; Santiago-Maldonado, Edgardo

    2007-01-01

    Wiring is a major operational component on aerospace hardware that accounts for substantial weight and volumetric space. Over time wire insulation can age and fail, often leading to catastrophic events such as system failure or fire. The next generation of wiring must be reliable and sustainable over long periods of time. These features will be achieved by the development of a wire insulation capable of autonomous self-healing that mitigates failure before it reaches a catastrophic level. In order to develop a self-healing insulation material, three steps must occur. First, methods of bonding similar materials must be developed that are capable of being initiated autonomously. This process will lead to the development of a manual repair system for polyimide wire insulation. Second, ways to initiate these bonding methods that lead to materials that are similar to the primary insulation must be developed. Finally, steps one and two must be integrated to produce a material that has no residues from the process that degrades the insulating properties of the final repaired insulation. The self-healing technology, teamed with the ability to identify and locate damage, will greatly improve reliability and safety of electrical wiring of critical systems. This paper will address these topics, discuss the results of preliminary testing, and remaining development issues related to self-healing wire insulation.

  13. Drawing with a Single Line.

    ERIC Educational Resources Information Center

    Johnson, Carole Austen; Anderson, Lorraine

    1979-01-01

    Described is a method of tapping students' creative potential in art: the Spontaneous Response Drawing. SRD consists of drawing with a single line, usually with crayons or colored felt tip pens on a large sheet of paper. (KC)

  14. Orbiter Kapton wire operational requirements and experience

    NASA Astrophysics Data System (ADS)

    Peterson, R. V.

    1994-09-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  15. Orbiter Kapton wire operational requirements and experience

    NASA Technical Reports Server (NTRS)

    Peterson, R. V.

    1994-01-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  16. 111. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    111. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Drawings for the first addition to Annex A. This drawing excerpted from blueprint set in Sears drawing archive. WEST ELEVATION AND TRANSVERSE SECTION (ANNEX A, BAYS P AND Q, FOR FLOORS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  17. [Teenagers' drawings in transcultural consultations].

    PubMed

    Simon, Amalini; Titia Rizzi, Alice

    The place of teenagers' drawings has been studied as part of a transcultural consultation, based on the creativity of the children of migrants. When speaking is difficult, drawings enable teenagers to show another dimension of their internal world. Aravin, a young Tamil boy, who lacked the necessary words, was able to express all the complexity of his thoughts through his drawings, finally being able to formulate in the group the difficult situations which he was drawing.

  18. Czech Children's Drawing of Nature

    ERIC Educational Resources Information Center

    Yilmaz, Zuhal; Kubiatko, Milan; Topal, Hatice

    2012-01-01

    Do world children draw nature pictures in a certain way? Range of mountains in the background, a sun, couple clouds, a river rising from mountains. Is this type of drawing universal in the way these nature items are organized on a drawing paper? The sample size from Czech Republic included 33 participants from two kindergartens. They were 5 and 6…

  19. A Right Brain Drawing Study.

    ERIC Educational Resources Information Center

    Taylor, Lucy E.

    This study was done to see if sixth grade students could improve their drawing abilities by looking at lines more abstractly--by drawing a picture viewing the original upside down and comparing it to the same student's drawing done viewing the original right side up. Pairs of works were scored on the basis of line quality, proportion, and likeness…

  20. Drawing the Sense of Touch.

    ERIC Educational Resources Information Center

    Kaupelis, Robert

    1984-01-01

    Techniques to help students do modeled drawings using Conte crayon or chalk are presented. Students must imagine that the crayon is actually touching the form they are drawing, pressing lightly on sections closest to them, and increasing the pressure to create darker tones as they draw the parts farther away. (RM)

  1. Novel solar cells in a wire format.

    PubMed

    Chen, Tao; Qiu, Longbin; Yang, Zhibin; Peng, Huisheng

    2013-06-21

    Photovoltaic devices in a wire format have recently attracted increasing attention as, compared with the conventional planar structure, they show unique and promising advantages. For instance, they are light-weight and can be easily woven into clothes or integrated into other structures, which enable applications in electronic textiles and various complex devices. In this tutorial review, the recent advancement in photovoltaic wires including both dye-sensitized and polymer solar cells are described. Two main architectures based on a single core-sheath fiber and twisted fibers are carefully illustrated with an emphasis on the comparison of various substrates which have been focused in past development. The current challenge including low energy conversion efficiency and low stability and future direction of the wire-shaped cell have been finally summarized.

  2. Microstructure evolution and mechanical properties of biomedical Mg-Zn-Gd alloy wires

    NASA Astrophysics Data System (ADS)

    Chunlei, Gan; Xiaohui, Li; Deng, Nong; Xiang, Zhang; Kaihong, Zheng; Zhenghua, Huang

    2017-03-01

    In order to manufacture the Mg-Zn-Gd alloy fine wires for the development of new biomedical Mg alloy implant devices, a hot extrusion and cold drawing process which is used to develop the Mg-Zn-Gd alloy fine wires were investigated. The results demonstrate that the Mg-Zn-Gd alloy has good formability. The microstructure and properties of the Mg-Zn-Gd alloy wires were studied by the observations of optical microscopy and scanning electron microscopy. The results show that the process is successfully developed to manufacture the high-quality wires with 3.00 mm diameter. The achievement of the high-quality Mg-Zn-Gd alloy wires is ascribed to the refined microstructure due to dynamic recrystallization during hot extrusion. Additionally, the grain morphology can play an important role in affecting the subsequent cold drawing performance.

  3. Metallurgical investigation of wire breakage of tyre bead grade

    PubMed Central

    Palit, Piyas; Das, Souvik; Mathur, Jitendra

    2015-01-01

    Tyre bead grade wire is used for tyre making application. The wire is used as reinforcement inside the polymer of tyre. The wire is available in different size/section such as 1.6–0.80 mm thin Cu coated wire. During tyre making operation at tyre manufacturer company, wire failed frequently. In this present study, different broken/defective wire samples were collected from wire mill for detailed investigation of the defect. The natures of the defects were localized and similar in nature. The fracture surface was of finger nail type. Crow feet like defects including button like surface abnormalities were also observed on the broken wire samples. The defect was studied at different directions under microscope. Different advanced metallographic techniques have been used for detail investigation. The analysis revealed that, white layer of surface martensite was formed and it caused the final breakage of wire. In this present study we have also discussed about the possible reason for the formation of such kind of surface martensite (hard-phase). PMID:26973808

  4. Cavitation during wire brushing

    NASA Astrophysics Data System (ADS)

    Li, Bo; Zou, Jun; Ji, Chen

    2016-11-01

    In our daily life, brush is often used to scrub the surface of objects, for example, teeth, pots, shoes, pool, etc. And cleaning rust and stripping paint are accomplished using wire brush. Wire brushes also can be used to clean the teeth for large animals, such as horses, crocodiles. By observing brushing process in water, we capture the cavitation phenomenon on the track of moving brush wire. It shows that the cavitation also can affect the surface. In order to take clear and entire pictures of cavity, a simplified model of one stainless steel wire brushing a boss is adopted in our experiment. A transparent organic tank filled with deionized water is used as a view box. And a high speed video camera is used to record the sequences. In experiment, ambient pressure is atmospheric pressure and deionized water temperature is kept at home temperature. An obvious beautiful flabellate cavity zone appears behind the moving steel wire. The fluctuation of pressure near cavity is recorded by a hydrophone. More movies and pictures are used to show the behaviors of cavitation bubble following a restoring wire. Beautiful tracking cavitation bubble cluster is captured and recorded to show.

  5. Splicing Wires Permanently With Explosives

    NASA Technical Reports Server (NTRS)

    Bement, Laurence J.; Kushnick, Anne C.

    1990-01-01

    Explosive joining process developed to splice wires by enclosing and metallurgically bonding wires within copper sheets. Joints exhibit many desirable characteristics, 100-percent conductivity and strength, no heat-induced annealing, no susceptibility to corrosion in contacts between dissimilar metals, and stability at high temperature. Used to join wires to terminals, as well as to splice wires. Applicable to telecommunications industry, in which millions of small wires spliced annually.

  6. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires §...

  7. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires §...

  8. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires §...

  9. Experimental study on dieless drawing of Nickel-Titanium alloy.

    PubMed

    Twohig, E; Tiernan, P; Tofail, S A M

    2012-04-01

    The effect of a dieless drawing process on commercial grade Nickel-Titanium rods, of 5 mm diameter, was investigated by varying the established critical process parameters of temperature, cooling rate, drawing velocity, and heating/cooling velocity. The rods were successfully dieless drawn with a maximum steady state reduction in cross-sectional area of 54%. The thermal and mechanical loading profiles of the rod during processing, and the resulting changes in microstructure and hardness, have been investigated. Uniform levels of stress and strain resulted in uniform reduction of the rod cross-sectional area. The grain structure was highly deformed in the drawing direction and increased porosity was observed as a result of the process. The longitudinal section hardness of the rod was significantly reduced as a result of the dieless drawing process. Any failures that arose were due to discontinuities within the material microstructure caused by a high necking rate, shorter exposure time to the process temperature and low heating and cooling rates. A uniform oxidation layer was observed on the surface of the processed rods as a result of processing in atmospheric conditions. This oxidation layer has the potential to aid in the lubrication of subsequent cold working operations of the dieless drawn rods. Coupling the thermomechanical effects of the dieless drawing process with a cold drawing processing step has the potential to produce a NiTi wire in fewer passes, and therefore at a reduced cost.

  10. 13. Photocopy of engineering drawing (original drawing,(original drawing, #MH 10460086, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of engineering drawing (original drawing,(original drawing, #MH 104-600-86, dated October 31, 1995, and drawn by W. Robinson, is located in the Mountain Home Air Force Base Civil Engineering archives. This 1995 drawing is a copy of drawing #MH 104-600-06, dated December 21, 1955, entitled "Repair Exterior Siding Elev. & Exterior Painting. Bldg. 611," also located in the Mountain Home Air Force Base Civil Engineering archives). FAC 611. - Mountain Home Air Force Base, Base Chapel, 350 Willow Street, Cantonment Area, Mountain Home, Elmore County, ID

  11. 118. Photographic copy of drawing (undated, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    118. Photographic copy of drawing (undated, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Larsen-Wulff Architects. 1/16 inch to one foot. Drawing of the entire floor plan from Homan Avenue to Central Park Avenue, probably traced in the 1970's or early 1980's. FOURTH FLOOR PLAN - WEST HALF - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  12. 94. Photographic copy of drawing (February 1905, original drawing in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    94. Photographic copy of drawing (February 1905, original drawing in Archives, Public Affairs Department, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Partial elevation drawing of the First four bays west of Homan Avenue. SOUTH ELEVATION - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  13. 121. Photographic copy of drawing (13 May 1905, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    121. Photographic copy of drawing (13 May 1905, original drawing in ArchiveS, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Adams and Schwab. 1/8 inch and 1/4 inch to one foot. Plan and section drawings for the installation and spiral chutes, includes structural framing details. DETAILS OF SPIRAL CONVEYORS IN MERCHANDISE BUILDING - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  14. 117. Photographic copy of drawing (undated, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. Photographic copy of drawing (undated, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Larsen-Wulff Architects. 1/16 inch to one foot. Drawing of the entire floor plan from Homan Avenue to Central Park Avenue, probably traced in the 1970's or early 1980's. FOURTH FLOOR PLAN - EAST HALF - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  15. 97. Photographic copy of drawing (14 February 1905, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    97. Photographic copy of drawing (14 February 1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/16 inch to one foot. Section drawings through the first four warehouse bays west of Homan Avenue. TRANSVERSE AND LONGITUDINAL SECTIONS - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  16. 108. Photographic copy of drawing (25 January 1910, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    108. Photographic copy of drawing (25 January 1910, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Floor plan for the first addition to Annex A. This drawing excerpted from blueprint set. FOURTH FLOOR PLAN (ANNEX A, BAYS J AND K, FOR FLOORS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  17. 109. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    109. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Floor plan for the first addition to Annex B. This drawing excerpted from blueprint set. FOURTH FLOOR PLAN (ANNEX B, BAYS P AND Q, FOR FLOORTS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  18. 100. Photographic copy of drawing (February, 1905, original drawing in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    100. Photographic copy of drawing (February, 1905, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/2 inch to one foot. Large scale details for the north elevation. This drawing is excerpted from a blueprint set. DETAIL ELEVATIONS AND SECTIONS - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  19. 10. Photocopy of drawing. (This drawing is an 8' x ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of drawing. (This drawing is an 8' x 10' enlargement from a 4' x 5' negative; 1942 drawing titled: Mobilization Hospital Buildings, Type HSW-98, Standard Ward, First Floor Architectural Plan and First Floor Framing Plan,' Plan 800-1935, located at Directorate of Engineering and Housing, Fort McPherson.) - Fort McPherson, World War II Station Hospital, Hospital Wards, Anderson Way & Howe Street, Atlanta, Fulton County, GA

  20. Advanced oil recovery technologies for improved recovery from Slope Basin clastic reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM. Quarterly technical progress report (sixth quarter), January 1, 1997--March 31, 1997

    SciTech Connect

    1997-04-30

    The overall objective of this project is to demonstrate that an advanced development drilling and pressure maintenance program based on advanced reservoir management methods can significantly improve oil recovery. The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced methods. A key goal is to transfer advanced methodologies to oil and gas producers in the Permian Basin and elsewhere, and throughout the U.S. oil and gas industry.

  1. Self-healable electrically conducting wires for wearable microelectronics.

    PubMed

    Sun, Hao; You, Xiao; Jiang, Yishu; Guan, Guozhen; Fang, Xin; Deng, Jue; Chen, Peining; Luo, Yongfeng; Peng, Huisheng

    2014-09-01

    Electrically conducting wires play a critical role in the advancement of modern electronics and in particular are an important key to the development of next-generation wearable microelectronics. However, the thin conducting wires can easily break during use, and the whole device fails to function as a result. Herein, a new family of high-performance conducting wires that can self-heal after breaking has been developed by wrapping sheets of aligned carbon nanotubes around polymer fibers. The aligned carbon nanotubes offer an effective strategy for the self-healing of the electric conductivity, whereas the polymer fiber recovers its mechanical strength. A self-healable wire-shaped supercapacitor fabricated from a wire electrode of this type maintained a high capacitance after breaking and self-healing.

  2. Advanced control technology and its potential for future transport aircraft

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The topics covered include fly by wire, digital control, control configured vehicles, applications to advanced flight vehicles, advanced propulsion control systems, and active control technology for transport aircraft.

  3. DrawFromDrawings: 2D Drawing Assistance with a Sketch Database.

    PubMed

    Matsui, Yusuke; Shiratori, Takaaki; Aizawa, Kiyoharu

    2016-04-14

    We present DrawFromDrawings, an interactive drawing system that provides users with visual feedback for assistance in 2D drawing using a database of sketch images. Following the traditional imitation and emulation training from art education, DrawFromDrawings enables users to retrieve and refer to a sketch image stored in a database and provides them with various novel strokes as suggestive or deformation feedback. Given regions of interest (ROIs) in the user and reference sketches, DrawFromDrawings detects as-long-as-possible (ALAP) stroke segments and the correspondences between user and reference sketches that are the key to computing seamless interpolations. The stroke-level interpolations are parametrized with the user strokes, the reference strokes, and new strokes created by warping the reference strokes based on the user and reference ROI shapes, and the user study indicated that the interpolation could produce various reasonable strokes varying in shapes and complexity. DrawFromDrawings allows users to either replace their strokes with interpolated strokes (deformation feedback) or overlays interpolated strokes onto their strokes (suggestive feedback). The other user studies on the feedback modes indicated that the suggestive feedback enabled drawers to develop and render their ideas using their own stroke style, whereas the deformation feedback enabled them to finish the sketch composition quickly.

  4. Development of a high conductivity intercalated graphite composite wire

    NASA Astrophysics Data System (ADS)

    Singhal, S. C.

    1982-02-01

    Composite wires previously fabricated by swaging and claimed to possess conductivity equal to or greater than that of copper were analyzed. Intercalation of HOPG crystals with SbF5+HF mixtures was studied to assess the effect of defects in the starting graphite on the final conductivity and also to determine the conductivity as a function of the stage of the compound. Composite wires consisting of copper, aluminum or lead outer sheath and SbF5+HF-or AsF5-intercalated graphite in the core were fabricated by swaging and/or drawing and then analyzed for their electrical conductivity.

  5. Static and dynamic detection of axial surface defects on metallic wires by conical triple laser reflection

    NASA Astrophysics Data System (ADS)

    Siegmann, P.; Martínez-Antón, J. C.; Bernabeu, E.

    2004-08-01

    The quality of the surface of metallic wires is relevant for different applications. The reflection of a laser beam on the surface of a metallic cylindrical wire provides an efficient way to inspect the quality of its surface. Our interest is focused in the detection of axially oriented defects, which are the most relevant for the wire drawing process. We present a simple interference-geometrical model to describe the light pattern reflected from a wire with defects. This model adequately accounts for the observed results from an industrial prototype developed for the purpose. It incorporates three-laser beams incident on the wire at equidistant locations in its perimeter, which produce three reflection cones with a CCD. This configuration permits to explore the whole perimeter of the wire. Several results are presented, both in static operation and in production line, in agreement with qualitative and quantitative predictions.

  6. Thin Magnetically Soft Wires for Magnetic Microsensors

    PubMed Central

    Zhukova, Valentina; Ipatov, Mihail; Zhukov, Arcady

    2009-01-01

    Recent advances in technology involving magnetic materials require development of novel advanced magnetic materials with improved magnetic and magneto-transport properties and with reduced dimensionality. Therefore magnetic materials with outstanding magnetic characteristics and reduced dimensionality have recently gained much attention. Among these magnetic materials a family of thin wires with reduced geometrical dimensions (of order of 1–30 μm in diameter) have gained importance within the last few years. These thin wires combine excellent soft magnetic properties (with coercivities up to 4 A/m) with attractive magneto-transport properties (Giant Magneto-impedance effect, GMI, Giant Magneto-resistance effect, GMR) and an unusual re-magnetization process in positive magnetostriction compositions exhibiting quite fast domain wall propagation. In this paper we overview the magnetic and magneto-transport properties of these microwires that make them suitable for microsensor applications. PMID:22291562

  7. 25. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). February 18, 1969. 4B51BK001. EXTERNAL PROTRON BEAM HALL. B51B FIRST FLOOR PLAN. - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  8. 22. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). September 29, 1964. 4B51K007 SECOND FLOOR PLAN. B51. - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  9. 26. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). October 24, 1956. 3/8'=1' 4B51S011. BEVATRON SHIELDING FOUNDATION - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  10. 28. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. AIR COOLED TEST STAND. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  11. 22. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, LOWER FLOOR PLANS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  12. 23. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, UPPER FLOOR PLANS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  13. 275. Photocopy of drawing (1977 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    275. Photocopy of drawing (1977 civil engineering drawing by the Strategic Air Command, VAFB, USAF) SITE PLAN, LOCATION MAP, AND CONTOUR MAP, ALSO TABLE OF CONTENTS AND GENERAL NOTES, SHEET 1 OF 10 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 4. PHOTOCOPY OF DRAWING (1960 CIVIL ENGINEERING DRAWING THE THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PHOTOCOPY OF DRAWING (1960 CIVIL ENGINEERING DRAWING THE THE RALPH M. PARSONS COMPANY) PLOT AND UTILITY PLAN FOR THE SAMOS TECHNICAL SUPPORT BUILDING (BLDG. 761; NOW CALLED SLC-3 AIR FORCE BUILDING), SHEET C47 - Vandenberg Air Force Base, Space Launch Complex 3, SLC-3 Air Force Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 17. Photocopy of drawing (1961 civil engineering drawing by Kaiser ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of drawing (1961 civil engineering drawing by Kaiser Engineers) SITE PLAN, PLOT PLAN, AND LOCATION MAP FOR VEHICLE SUPPORT BUILDING, SHEET C-1 - Vandenberg Air Force Base, Space Launch Complex 3, Vehicle Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  16. 14. Photocopy of engineering drawing (original drawing, #MH 10460086, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of engineering drawing (original drawing, #MH 104-600-86, dated October 31, 1995, and drawn by W. Robinson, is located in the Mountain Home Air Force Base Civil Engineering archives). - Mountain Home Air Force Base, Base Chapel, 350 Willow Street, Cantonment Area, Mountain Home, Elmore County, ID

  17. 113. Photocopy of drawing (1964 civil engineering drawing by Koebig ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    113. Photocopy of drawing (1964 civil engineering drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING, POINT ARGUELLO LAUNCH COMPLEX ONE, GRADING AND UTILITY PLAN, SHEET C3 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 3. PHOTOCOPY OF DRAWING (1975 CIVIL ENGINEERING DRAWING BY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOCOPY OF DRAWING (1975 CIVIL ENGINEERING DRAWING BY THE STRATEGIC AIR COMMAND, USAF) PROFILE AND PLAN OF ACCESS DRIVE FOR BUILDING 768, SHEET 1 OF 8 - Vandenberg Air Force Base, Space Launch Complex 3, Entry Control Point, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  19. 29. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. 19508 RENOVATION OF FIRST FLOOR, CENTRAL PORTION. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  20. 120. Photocopy of drawing (1958 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    120. Photocopy of drawing (1958 civil engineering drawing by the Ralph M. Parsons Company) STRUCTURAL DETAILS OF WAVE GUIDE ENCLOSURE AND CABLE TRAY INSTALLATION FOR LAUNCH OPERATIONS BUILDING, SHEET C42 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. 231. Photocopy of drawing (1958 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    231. Photocopy of drawing (1958 civil engineering drawing by the Ralph M. Parsons Company) PAVING DETAILS FOR THE LSB, SHEET C23 OF 40 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. 21. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, RAMP DETAILS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  3. 118. Photocopy of drawing (1958 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    118. Photocopy of drawing (1958 civil engineering drawing by the Ralph M. Parsons Company) PLOT AND UTILITY PLAN FOR LAUNCH OPERATIONS BUILDING, SHEET C7 OF 40 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. 25. Photocopy of engineering drawing, January, 1988 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopy of engineering drawing, January, 1988 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). EXTERIOR ELEVATIONS (northeast and southeast) - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  5. 168. Photocopy of drawing (1979 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    168. Photocopy of drawing (1979 civil engineering drawing by the Space and Missile Test Center, USAF) NITROGEN AND HELIUM PUMPING SYSTEM INSTALLATION SITE PLAN, SHEET 511-C-1 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 157. Photocopy of drawing (1966 civil engineering drawing by AETRON) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    157. Photocopy of drawing (1966 civil engineering drawing by AETRON) PLOT AND LOCATION PLAN, SECTIONS, AND DETAILS FOR THE UNDERGROUND CHECKOUT FACILITY ON THE WEST PAD, SHEET C-1 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 3. PHOTOCOPY OF DRAWING (1976 CIVIL ENGINEERING DRAWING BY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOCOPY OF DRAWING (1976 CIVIL ENGINEERING DRAWING BY THE SPACE AND MISSILE TEST CENTER, VAFB, USAF) PARTIAL SITE PLAN, EQUIPMENT STORAGE BUILDING, PARKING AREA OVERLAY, AND NEW ROAD, SHEET C4 - Vandenberg Air Force Base, Space Launch Complex 3, Storage Shed, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. 1. Photocopy of drawing 1958 architectural drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of drawing 1958 architectural drawing by the Ralph Parsons Company in possession of Vandenberg Air Force Base Civil Engineering Office) FLOOR PLANS, ELEVATIONS, AND DETAILS FOR TRAFFIC CHECK HOUSE (BLDG. 759), AND THEODOLITE SHELTERS, SHEET A9 - Vandenberg Air Force Base, Space Launch Complex 3, Traffic Check House, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  9. 20. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, ELEVATIONS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  10. 24. Photocopy of engineering drawing, August 17, 1965 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photocopy of engineering drawing, August 17, 1965 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). 2080 READINESS CREW, COVERED WALKWAYS, PLAN AND DETAILS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  11. 26. Photocopy of engineering drawing, March 3, 1988 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photocopy of engineering drawing, March 3, 1988 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). EXTERIOR ELEVATIONS (southwest and northwest) - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  12. 244. Photocopy of drawing (1958 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    244. Photocopy of drawing (1958 civil engineering drawing by the Ralph M. Parsons Company) PLOT AND UTILITY PLAN FOR THE LSB, SHEET C5 OF 40 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. 119. Photocopy of drawing (1959 civil engineering drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    119. Photocopy of drawing (1959 civil engineering drawing by the Ralph M. Parsons Company) PLOT PLAN AND PROFILE LINES OF WAVE GUIDE ENCLOSURE AND CABLE TRAY INSTALLATION FOR LAUNCH OPERATIONS BUILDING, SHEET C41 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 27. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. CROSS-SECTION, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  15. 25. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. ELEVATIONS, RIGHT AND LEFT PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  16. 18. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. FIRST FLOOR PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  17. 21. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. SECOND FLOOR PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  18. 26. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. CROSS-SECTION, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  19. 19. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. FIRST FLOOR PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  20. 17. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. BASEMENT FLOOR PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  1. 20. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. SECOND FLOOR PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  2. 24. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. ELEVATIONS, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  3. 16. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. BASEMENT FLOOR PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  4. 22. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. THIRD FLOOR AND ROOF PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  5. 23. Photocopy of engineering drawing, May, 1941 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. THIRD FLOOR AND ROOF PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  6. 1. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). January 1961. Dwg No. 6B 00D 005 CONTRACT 48 LEASE AND OCCUPANCY MAP - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  7. 7. Photographic copy of construction drawing 1958 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing 1958 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Sections and details, both buildings. - Offutt Air Force Base, Looking Glass Airborne Command Post, Hydraulic Fluid Buildings, Northeast of Looking Glass Avenue at southwest side of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  8. 6. Photographic copy of construction drawing 1970 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of construction drawing 1970 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Floor plan and section. - Offutt Air Force Base, Looking Glass Airborne Command Post, Vehicle Refueling Shop, In west corner of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  9. 4. Photographic copy of construction drawing 1958 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photographic copy of construction drawing 1958 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Blast deflector fence plan, elevations, and details. - Offutt Air Force Base, Looking Glass Airborne Command Post, Blast Deflector Fences, Northeast & Southwest sides of Operational Apron, Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  10. 8. Photographic copy of construction drawing 1964 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing 1964 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Interior isometric with pump equipment, building no. 528. - Offutt Air Force Base, Looking Glass Airborne Command Post, Hydraulic Fluid Buildings, Northeast of Looking Glass Avenue at southwest side of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  11. 24. Photographic copy of construction drawing 1957 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photographic copy of construction drawing 1957 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevations and sectinos for fabric closure (gasket) for hangar doors. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  12. 6. Photographic copy of construction drawing 1958 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of construction drawing 1958 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Floor plan, roof plan, and elevations, both buildings. - Offutt Air Force Base, Looking Glass Airborne Command Post, Hydraulic Fluid Buildings, Northeast of Looking Glass Avenue at southwest side of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  13. 3. Photographic copy of construction drawing 1958 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photographic copy of construction drawing 1958 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Blast deflector fence plan. - Offutt Air Force Base, Looking Glass Airborne Command Post, Blast Deflector Fences, Northeast & Southwest sides of Operational Apron, Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  14. 26. Photographic copy of construction drawing 1957 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of construction drawing 1957 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Floor and ceiling plan, interior elevations, detail sections, dock nos. 491, 492, and 493. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  15. 50. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). June 6, 1949. 1/18'=1'. 5N51A002. BEVATRON SUB FLOOR PLAN - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  16. Photocopy of engineering drawing dated June 30, 1944. (Original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of engineering drawing dated June 30, 1944. (Original drawing located in Command Historian's Archives, Naval Facilities Engineering Command, Port Hueneme, California. SITE PLAN OF ROOSEVELT BASE, JUNE 30, 1944 - Roosevelt Base, Bounded by Ocean Boulevard, Pennsylvania Avenue, Richardson Avenue, & Idaho Street, Long Beach, Los Angeles County, CA

  17. 46. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). July 15, 1955. B51A0084. BEVATRON CONTROL ROOM - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  18. 49. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). June 6, 1949. B51A0354. BEVATRON PLOT PLAN (MASTEN AND HURD) - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  19. 47. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). July 15, 1955. B51A0084. BEVATRON CONTROL ROOM CEILING TREATMENT AND RELOCATION OF LIGHTS - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  20. 60. Photocopy of engineering drawing (original drawing located in LBNL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. Photocopy of engineering drawing (original drawing located in LBNL Building 90F Architecture and Engineering As-Built Collection). September 20, 1964. 4B51K001A. MAIN FLOOR PLAN B-51-51A - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  1. 230. Photocopy of drawing (1958 structural drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    230. Photocopy of drawing (1958 structural drawing by the Ralph M. Parsons Company) PLAN AND SECTIONS FOR THE UMBILICAL MAST TRENCH SHEET S20 OF 45 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. 259. Photocopy of drawing (1976 piping drawing by the Space ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    259. Photocopy of drawing (1976 piping drawing by the Space and Missile Test Center, VAFB, USAF) PLANS, SECTIONS, AND DETAILS OF THE DELUGE WATER SYSTEM FOR THE FLAME BUCKET, SHEET P-17 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  3. 182. Photocopy of drawing (1972 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    182. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) PLAN FOR THE LIQUID NITROGEN STORAGE AND BOOSTER CONTROL ROOM FOR THE LSB (BLDG. 770), SHEET P-12 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. 238. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    238. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) NITROGEN FLOW DIAGRAM FOR THE LSB, SHEET P3 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. 236. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    236. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) SECTIONS AND DETAILS FOR THE FUEL, HELIUM, AND NITROGEN STORAGE AREA FOR THE LSB, SHEET P14 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 235. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    235. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) PLAN FOR THE FUEL, HELIUM, AND NITROGEN STORAGE AREA FOR THE LSB, SHEET P13 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 264. Photocopy of drawing (1977 piping drawing by the Space ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    264. Photocopy of drawing (1977 piping drawing by the Space and Missile Test Center, VAFB, USAF) NITROGEN AND HELIUM PUMPING SYSTEMS INSTALLATION SITE PLAN AND DETAILS, SHEET 3 OF 9 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. 183. Photocopy of drawing (1965 mechanical drawing by Koebig & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    183. Photocopy of drawing (1965 mechanical drawing by Koebig & Koebig, Inc.) GASEOUS NITROGEN PURGE SYSTEM FOR THE MST, SHEET M-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  9. 7. Photographic copy of construction drawing 1976 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevations of entire building exterior. Includes elevation, plan and details of the addition's interior stairs. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  10. 8. Photographic copy of construction drawing 1976 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Floor plan of entire building. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  11. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama), 1916. Elevation on prado - Balboa School, Northeast end of El Prado, Balboa, Former Panama Canal Zone, CZ

  12. Photographic copy of architectural drawing no. 40215. (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing no. 4021-5. (original drawing located at the Engineering and Planning Office, Panama Canal Commission, Balboa, Republic of Panama). New Ancon Hospital general layout - Gorgas Hospital, Southwest of Gorgas Road, Balboa Heights, Former Panama Canal Zone, CZ

  13. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama). Sections and layout plans. - Fort Davis, Theater, Clem Road, Colon, Former Panama Canal Zone, CZ

  14. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1917. Section and details - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  15. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1917. Left side and front framing - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  16. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama). Details. - Fort Davis, Theater, Clem Road, Colon, Former Panama Canal Zone, CZ

  17. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1917. Right side and front elevations - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  18. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama). Floor plans. - Fort Davis, Theater, Clem Road, Colon, Former Panama Canal Zone, CZ

  19. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama). Elevations. - Fort Davis, Theater, Clem Road, Colon, Former Panama Canal Zone, CZ

  20. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, (U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1917. Right side and rear framing. - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  1. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1917. Interior partition framing - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  2. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1917. Left side and rear elevations - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  3. Photographic copy of architectural drawing (original drawing located in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located in the vault at the Directorate of Engineering and Housing, U.S. Army Garrison-Panama, Corozal, Republic of Panama), 1916. Floor plan - Fort Amador, Officers' Quarters, Fifth Street at intersection with Amador Road, Panama City, Former Panama Canal Zone, CZ

  4. Photocopy of drawing (February, 1936 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (February, 1936 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) TYPE "B" APARTMENT UNITS, FLOOR PLAN AND LOCATION PLAN. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  5. 11. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLOT PLAN SHOWING STREETS AND SIDEWALK OF TECHWOOD PROJECT #1101, SHEET A-2. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  6. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) FLOOR PLANS, TYPE "C" APARTMENTS. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  7. Photocopy of drawing (February, 1936 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (February, 1936 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) TYPE "C" and "D" APARTMENT UNITS, FLOOR PLAN AND LOCATION PLAN. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  8. Photocopy of drawing (November, 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November, 1934 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) FLOOR PLANS, TYPE "D" APRTMENTS. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  9. Photocopy of drawing June, 1962 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing June, 1962 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) SITE PLAN IDENTIFYING SITE IMPROVEMENTS. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  10. Photocopy of drawing (February, 1936 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (February, 1936 Architectural Drawings by Burge and Stevens Architects, in possession of the Atlanta Housing Authority, Atlanta, GA) TYPE "A" APARTMENT UNITS, FLOOR PLAN AND LOCATION PLAN. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  11. 10. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). SITE OF TECHWOOD PROJECT #1101, SHEET A-1. - Techwood Homes (Public Housing), Bounded by North Avenue, Parker Street, William Street & Lovejoy Street, Atlanta, Fulton County, GA

  12. Photographic copy of original construction drawing, Elevations Architectural, drawing No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of original construction drawing, Elevations Architectural, drawing No. 60-02-66 SF/5/1871, Wilcox, Erickson, Vogelbach and Baumann, New York, 1 May, 1959, on file Selfridge Base Museum. - Selfridge Field, Building No. 1031, West of Doolittle Avenue between B & C Streets, Mount Clemens, Macomb County, MI

  13. 117. Photocopy of drawing (1964 mechanical drawing by Koebig & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. Photocopy of drawing (1964 mechanical drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING; POINT ARGUELLO LAUNCH COMPLEX ONE; ABBREVIATIONS, SYMBOLS, AND SCHEDULES; SHEET M-1 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 242. Photocopy of drawing (1958 electrical drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    242. Photocopy of drawing (1958 electrical drawing by the Ralph M. Parsons Company) UPPER LEVEL POWER LIGHTING AND COMMUNICATIONS PLAN FOR THE LSB, SHEET E21 OF 40 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 146. Photocopy of drawing (1967 electrical drawing by Koebig & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    146. Photocopy of drawing (1967 electrical drawing by Koebig & Koebig Inc.) MST MODIFICATION AND REFURBISHMENT; LIGHTING, AND POWER PLANS FOR STATIONS 12, 21, 30, AND 39, SHEET E-5 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  16. 112. Photocopy of drawing (1958 electrical drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    112. Photocopy of drawing (1958 electrical drawing by the Ralph M. Parsons Company) LIGHTING AND ALARMS PLANS FOR LAUNCH OPERATIONS BUILDING, SHEET E17 OF 40 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  17. 243. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    243. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) WATER SYSTEMS FLOW DIAGRAM FOR THE LSB, SHEET P6 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 240. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    240. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) HELIUM FLOW DIAGRAM FOR THE LSB, SHEET P4 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  19. 237. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    237. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) BOOSTER FUEL SYSTEM FLOW DIAGRAM FOR THE LSB, SHEET P1 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. 116. Photocopy of drawing (1964 mechanical drawing by Koebig & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    116. Photocopy of drawing (1964 mechanical drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING, POINT ARGUELLO LAUNCH COMPLEX ONE, FLOW SHEET 1 AND PIPING PLANS, SHEET M-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. 241. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    241. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) VEHICLE SERVICING SYSTEMS FLOW DIAGRAM FOR THE LSB, SHEET P5 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. Photocopy of original drawing showing Wing A (drawing located at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of original drawing showing Wing A (drawing located at NAWS China Lake, Division of Public Works). J.T. STAFFORD-J.H. DAVIES- H.L. GOGERTY: DISPENSARY, SICK CALL AND ADMINISTRATION, FLOOR PLAN AND ELEVATIONS - Naval Ordnance Test Station Inyokern, Dispensary, Main Site, Lauritsen Road at McIntyre Street, Ridgecrest, Kern County, CA

  3. Photocopy of original drawing showing Wing B (drawing located at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of original drawing showing Wing B (drawing located at NAWS China Lake, Division of Public Works). J.T. STAFFORD-J.H. DAVIES-H.L. GOGERTY: DISPENSARY, SURGICAL AND OBSTETRICAL, FLOOR PLAN AND ELEVATIONS - Naval Ordnance Test Station Inyokern, Dispensary, Main Site, Lauritsen Road at McIntyre Street, Ridgecrest, Kern County, CA

  4. Photocopy of original drawing showing Wing A (drawing located at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of original drawing showing Wing A (drawing located at NAWS China Lake, Division of Public Works). J.T. STAFFORD-J.H. DAVIES-H.L. GOGERTY: DISPENSARY, SICK CALL AND ADMINISTRATION, ROOF FRAMING PLAN AND DETAILS - Naval Ordnance Test Station Inyokern, Dispensary, Main Site, Lauritsen Road at McIntyre Street, Ridgecrest, Kern County, CA

  5. Photocopy of original drawing showing Building 3 layout (drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of original drawing showing Building 3 layout (drawing located at NAWS China Lake, Division of Public Works). J.T. STAFFORD-J.H. DAVIES-H.L. GOGERTY: DISPENSARY, CONNECTING CORRIDORS, FLOOR PLAN, ELEVATIONS, AND DETAILS - Naval Ordnance Test Station Inyokern, Dispensary, Main Site, Lauritsen Road at McIntyre Street, Ridgecrest, Kern County, CA

  6. Photocopy of original drawing showing Wing E (drawing located at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of original drawing showing Wing E (drawing located at NAWS China Lake, Division of Public Works). J.T. STAFFORD-J.H. DAVIES-H.L. GOGERTY: SICK OFFICERS QUARTERS, FLOOR PLAN AND ELEVATIONS - Naval Ordnance Test Station Inyokern, Dispensary, Main Site, Lauritsen Road at McIntyre Street, Ridgecrest, Kern County, CA

  7. 1. Photocopy of measured drawing (original drawing in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of measured drawing (original drawing in the possession of the Rigsarkivet (Royal Archives), Copenhagen, Denmark, filed in Kortsamling 337C, Plan VI. Peter L. Oxholm, architect, 1779 PLAN OF GOVERNMENT HOUSE AND ELEVATION OF KING STREET (SOUTHWEST) FACADE - Government House, King Street, Christiansted, St. Croix, VI

  8. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1945. Plans and details for post office alterations - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  9. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Real Property Office, Naval Base Rodman, Republic of Panama), 1943. Proposed design for post office alterations - Fort Amador, Administration Building, Rear Admiral Nimitz Circle, Panama City, Former Panama Canal Zone, CZ

  10. 3. PHOTOCOPY OF DRAWING (1960 ARCHITECTURAL DRAWING BY THE RALPH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOCOPY OF DRAWING (1960 ARCHITECTURAL DRAWING BY THE RALPH M. PARSONS COMPANY) FLOOR PLAN, ELEVATIONS, AND SECTION FOR THE SAMOS TECHNICAL SUPPORT BUILDING (BLDG. 761; NOW CALLED SLC-3 AIR FORCE BUILDING), SHEET A14 - Vandenberg Air Force Base, Space Launch Complex 3, SLC-3 Air Force Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  11. 9. Photograph copy of construction drawing, 1964 (original drawing in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photograph copy of construction drawing, 1964 (original drawing in Building No. 301, Offutt Air Force Base, Bellevue, Nebraska). Site plan of project looking glass historic district and Offutt Air Force Base. - Offutt Air Force Base, Looking Glass Airborne Command Post, Looking Glass Avenue between Comstat Drive & Nightwatch Avenue, Offutt Air Force Base, Bellevue, Sarpy County, NE

  12. 4. PHOTOCOPY OF DRAWING (1976 STRUCTURAL AND ELECTRICAL DRAWING BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PHOTOCOPY OF DRAWING (1976 STRUCTURAL AND ELECTRICAL DRAWING BY THE SPACE AND MISSILE TEST CENTER, VAFB, USAF) STRUCTURAL AND ELECTRICAL DIAGRAM FOR EQUIPMENT STORAGE BUILDING, SHEET S-26 - Vandenberg Air Force Base, Space Launch Complex 3, Storage Shed, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. 8. PHOTOCOPY OF DRAWING (1975 ELECTRICAL DRAWING BY THE RALPH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. PHOTOCOPY OF DRAWING (1975 ELECTRICAL DRAWING BY THE RALPH M. PARSONS COMPANY) ELECTRICAL PLAN AND DETAILS FOR BUILDING 762-A, SHEET E4 - Vandenberg Air Force Base, Space Launch Complex 3, Technical Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 5. PHOTOCOPY OF DRAWING (1975 ELECTRICAL DRAWING BY THE STRATEGIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. PHOTOCOPY OF DRAWING (1975 ELECTRICAL DRAWING BY THE STRATEGIC AIR COMMAND, USAF) ELECTRICAL PLANS FOR BUILDING 768, SHEET 7 OF 8 - Vandenberg Air Force Base, Space Launch Complex 3, Entry Control Point, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 2. Photocopy of drawing (1976 structural and electrical drawing by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photocopy of drawing (1976 structural and electrical drawing by the Strategic Air Command, USAF) SITE PLAN, STRUCTURAL AND ELECTRICAL FOR RELOCATING WAREHOUSE, SHEET 1 OF 1 - Vandenberg Air Force Base, Space Launch Complex 3, Storage Shed, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  16. 160. Photocopy of drawing (1967 electrical drawing by Koebig & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    160. Photocopy of drawing (1967 electrical drawing by Koebig & Koebig, Inc.) MST MODIFICATION AND REFURBISHMENT; ELECTRICAL MODIFICATIONS OF LAUNCH DECK, SHEET E-3 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  17. 162. Photocopy of drawing (1961 mechanical drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    162. Photocopy of drawing (1961 mechanical drawing by the Ralph M. Parsons Company) MODIFICATION, MECHANICAL ELEVATIONS, AND DETAILS FOR THE MST, SHEET M22 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 24. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). SCHEDULES OF DOORS, WINDOWS, AND INTERIOR FINISHES OF TECHWOOD PROJECT #1101, SHEET A-56. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  19. 34. Photocopy of drawing (November 1934 architectural drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). LANDSCAPE AND SITE PLAN OF TECHWOOD PROJECT # 1101, SHEET L-259. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  20. 15. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLANTING PLAN AND PLANT LIST, BUILDINGS 1,2,3, AND GARAGES, TECHWOOD PROJECT #1101, SHEET L-250. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  1. 12. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLANTING PLAN AND PLANT LIST, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET L-251. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA

  2. 20. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FLOOR PLANS, TYPE 'C' APARTMENTS, KITCHEN ELEVATIONS, TECHWOOD PROJECT #1101, SHEET A-53. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  3. 19. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FLOOR PLANS, TYPE 'A' APARTMENTS, FLOOR PLANS, TYPE 'B' APARTMENTS, KITCHEN ELEVATIONS, TECHWOOD PROJECT #1101, SHEET A-52. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  4. 35. Photocopy of drawing (November 1934 architectural drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). BASEMENT PLAN OF TECHWOOD PROJECT # 1101, SHEET A-45. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  5. 37. Photocopy of drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photocopy of drawing (November 1934 Architectural Drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). WEST, EAST, AND NORTH ELEVATIONS, AND SECTION THROUGH COURTYARD LOOKING NORTH, OF TECHWOOD PROJECT # 1101, SHEET A-47. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  6. 36. Photocopy of drawing (November 1934 architectural drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FIRST FLOOR PLAN (WITH VIGNETTES OF THIRD FLOOR) AND BATHROOM SECTIONS OF TECHWOOD PROJECT # 1101, SHEET A-46. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  7. 29. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). ELEVATIONS, BUILDINGS 3, TECHWOOD PROJECT #1101, SHEET A-7. - Techwood Homes, Building No. 3, 559 Techwood Drive & 129-135 Merrit Avenue, Atlanta, Fulton County, GA

  8. 16. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of The Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLOT PLAN AND ROOF PLAN, BUILDINGS 1,2,3, AND GARAGES, TECHWOOD PROJECT #1101, SHEET A-3. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  9. 18. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FIRST FLOOR PLANS, BUILDINGS 1,2, AND 3, TECHWOOD PROJECT #1101, SHEET A-5. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  10. 38. Photocopy of drawing (November 1934 architectural drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). SOUTH ELEVATION, SECTION THROUGH COURTYARD LOOKING SOUTH, AND ENTRANCE DETAILS, OF TECHWOOD PROJECT # 1101, SHEET A-48. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  11. 40. Photocopy of drawing (November 1934 architectural drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). DETAILS OF ENTRANCES AND STAIRS (CONTINUED) OF TECHWOOD PROJECT # 1101, SHEET A-50. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  12. 28. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FLOOR PLANS, TYPE 'D' APARTMENTS, KITCHEN ELEVATIONS, TECHWOOD PROJECT #1101, SHEET A-54. - Techwood Homes, Building No. 3, 559 Techwood Drive & 129-135 Merrit Avenue, Atlanta, Fulton County, GA

  13. 14. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FLOOR PLANS AND ELEVATIONS, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET A-9. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA

  14. 17. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). BASEMENT PLANS, BUILDINGS 1,2, AND 3, TECHWOOD PROJECT #1101, SHEET A-4. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  15. 39. Photocopy of drawing (November 1934 architectural drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). DETAILS OF ENTRANCES AND STAIRS OF TECHWOOD PROJECT # 1101, SHEET A-49. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA

  16. Photocopy of drawing (November 1934 Architect Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (November 1934 Architect Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLOT PLAN SHOWING STREETS AND SIDEWALK OF TECHWOOD PROJECT #1101, SHEET A-2. - Techwood Homes, Building No. 16, 488-514 Techwood Drive, Atlanta, Fulton County, GA

  17. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capitol Improvements Department of the Atlantic Housing Authority, Atlanta, Georgia). SITE PLAN OF TECHWOOD PORJECT # 1101, SHEET A-1. - Techwood Homes, Building No. 16, 488-514 Techwood Drive, Atlanta, Fulton County, GA

  18. 13. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLOT PLAN AND ROOF PLAN, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET A-8. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA

  19. 21. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). ELEVATIONS, BUILDINGS 1 AND 2, TECHWOOD PROJECT #1101, SHEET A-6. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  20. 172. Photocopy of drawing (1958 electrical drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    172. Photocopy of drawing (1958 electrical drawing by the Ralph M. Parsons Company) POWER AND ALARMS, MST STATIONS 70.5, 78, 85.5, 111, AND 112, SHEET E32 OF 40 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. 7. Photograph of extant ink on linen drawings (original drawings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photograph of extant ink on linen drawings (original drawings held in the vault of the Office of the State Architect in Sacramento) DETAILS OF FLAT SLAB CONSTRUCTION, AUGUST 1922 - California State Printing Office, 1020 O Street, Sacramento, Sacramento County, CA

  2. 250. Photocopy of drawing (1858 structural drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    250. Photocopy of drawing (1858 structural drawing by the Ralph M. Parsons Company) PLANS, ELEVATIONS, SECTIONS, AND DETAILS FOR THE TELEVISION TOWERS AND SUPPORTS AT LSB (BLDG. 751), SHEET S23 OF 45 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  3. 159. Photocopy of drawing (1966 structural drawing by AETRON) CONCRETE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    159. Photocopy of drawing (1966 structural drawing by AETRON) CONCRETE SECTIONS AND DETAILS NO. 1 OF THE UNDERGROUND CHECKOUT FACILITY, SHEET S-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. 158. Photocopy of drawing (1966 structural drawing by AETRON) FRAMING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    158. Photocopy of drawing (1966 structural drawing by AETRON) FRAMING PLAN, ELEVATIONS, SECTIONS, AND DETAILS FOR THE TRANSFER AREA SHELTER AND UNDERGROUND CHECKOUT FACILITY, SHEET S-4 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. 190. Photocopy of drawing (1975 structural drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    190. Photocopy of drawing (1975 structural drawing by the Ralph M. Parsons Company) ENVIRONMENTAL DOORS, ELEVATIONS FOR THE MST, SHEET S-11 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 191. Photocopy of drawing (1975 mechanical drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    191. Photocopy of drawing (1975 mechanical drawing by the Ralph M. Parsons Company) ENVIRONMENTAL DOORS, HYDRAULIC UNIT, CYLINDER, AND HINGES FOR THE MST, SHEET M-6 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 234. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    234. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) BOOSTER LIQUID OXYGEN SYSTEM FLOW DIAGRAM FOR THE LSB, SHEET P2 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. 232. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    232. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) PLAN FOR THE LIQUID AND GASEOUS OXYGEN STORAGE AREA IN THE LSB, SHEET P17 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  9. 179. Photocopy of drawing (1972 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    179. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) LIQUID OXYGEN STORAGE PLAN FOR THE LSB (BLDG. 770), SHEET P-7 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  10. 233. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    233. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) PLAN FOR THE LIQUID OXYGEN CONTROL ROOM FOR THE LSB, SHEET P16 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  11. 256. Photocopy of drawing (1975 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    256. Photocopy of drawing (1975 piping drawing by the Ralph M. Parsons Company) LIQUID OXYGEN FLOW DIAGRAM FOR THE LSB AREA, SHEET P-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  12. 257. Photocopy of drawing (1975 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    257. Photocopy of drawing (1975 piping drawing by the Ralph M. Parsons Company) PARTIAL PIPING PLAN OF THE LIQUID OXYGEN STORAGE AREA FOR THE LSB, SHEET P-5 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. 180. Photocopy of drawing (1972 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    180. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) LIQUID OXYGEN FLOW DIAGRAM FOR THE LSB (BLDG. 770), SHEET P-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  14. 131. Photographic copy of drawing (undated, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    131. Photographic copy of drawing (undated, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Engineer unknown. Full size. Pneumatic tube cartridges used at the time of the Plant closing. 4' PNEUMATIC TUBE SYSTEM - 11' LEATHER CARRIER - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  15. 130. Photographic copy of drawing (undated, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    130. Photographic copy of drawing (undated, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Engineer unknown. Full size. Pneumatic tube cartridges used at the time of the Plant closing. 4' PNEUMATIC TUBE SYSTEM - 11' LEATHER CARRIER - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  16. 22. Photographic copy of original construction drawing, ca. 1916 (drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photographic copy of original construction drawing, ca. 1916 (drawing located at the Thompson Falls Hydroelectric Project, Thompson Falls, Montana). Architect unknown. POWERHOUSE FOREMAN'S BUNGALOW; FIRST FLOOR PLAN. - Thompson Falls Hydroelectric Project, Power Foreman's Bungalow, On island between Forebay Channel & ClarkFord River, Thompson Falls, Sanders County, MT

  17. 253. Photocopy of drawing (1975 demolition drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    253. Photocopy of drawing (1975 demolition drawing by the Ralph M. Parsons Company) DEMOLITION AND REMOVAL FOR LAUNCHER - SLC-3E, SHEET D-9 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 186. Photocopy of drawing (1975 demolition drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    186. Photocopy of drawing (1975 demolition drawing by the Ralph M. Parsons Company) DEMOLITION AND REMOVAL PLANS FOR THE MST; NORTH, SOUTH, AND EAST, TOWER ELEVATIONS, SHEET D-3 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  19. 187. Photocopy of drawing (1975 demolition drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    187. Photocopy of drawing (1975 demolition drawing by the Ralph M. Parsons Company) DEMOLITION AND REMOVAL PLANS FOR MST STATIONS 3 AND 12, SHEET D-4 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. 188. Photocopy of drawing (1975 demolition drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    188. Photocopy of drawing (1975 demolition drawing by the Ralph M. Parsons Company) DEMOLITION AND REMOVAL PLANS FOR MST STATION 39, 48, 55.5, AD 63, SHEET D-6 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. 13. Photocopy of architectural drawing #571718 (original drawing located in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of architectural drawing #571718 (original drawing located in Southern California Edison Archives, Rosemead, California). THREE FAMILY HOUSE FOR SOUTHERN SIERRAS POWER COMPANY LEE VINING CREEK POWER PLANT, FLOOR PLAN. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  2. 7. Photocopy of architectural drawing #571717 (original drawing located in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of architectural drawing #571717 (original drawing located in Southern California Edison Archives, Rosemead, California). THREE FAMILY HOUSE FOR SOUTHERN SIERRAS POWER COMPANY LEE VINING CREEK POWER PLANT, FOUNDATION PLAN. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  3. Photographic copy of architectural drawing (original drawing located at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of architectural drawing (original drawing located at the Panama Canal Commission Headquarters Building, Department of Engineering Vault, Balboa Heights, Republic of Panama). Details of bookshelves and pilasters. - Quarry Heights, Officers' Quarters, Parkinson Lane, Balboa, Former Panama Canal Zone, CZ

  4. 222. Photocopy of drawing (1958 piping drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    222. Photocopy of drawing (1958 piping drawing by the Ralph M. Parsons Company) VEHICLE SERVICING SYSTEMS SECTIONS FOR THE UMBILICAL MAST, SHEET P24 OF 36 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. 278. Photocopy of drawing (1978 structural electrical drawing by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    278. Photocopy of drawing (1978 structural electrical drawing by the Space and Missile Test Center, VAFB, USAF) DETAILS, SECTION, AND ELECTRICAL PLAN FOR THE TIROS AND NOAA THEODOLITE STATION, SLC-3E, SHEET 4 OF 4 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 18. Photocopy of drawing (1961 architectural drawing by Kaiser Engineers) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of drawing (1961 architectural drawing by Kaiser Engineers) FLOOR PLAN, ELEVATIONS, AND SCHEDULE FOR VEHICLE SUPPORT BUILDING, SHEET A-1 - Vandenberg Air Force Base, Space Launch Complex 3, Vehicle Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. On astronomical drawing [1846

    NASA Astrophysics Data System (ADS)

    Smyth, Charles Piazzi

    Reprinted from the Memoirs of the Royal Astronomical Society 15, 1846, pp. 71-82. With annotations and illustrations added by Klaus Hentschel. The activities of the Astronomer Royal for Scotland, Charles Piazzi Smyth (1819-1900), include the triangulation of South African districts, landscape painting, day-to-day or tourist sketching, the engraving and lithographing of prominent architectural sites, the documentary photography of the Egyptian pyramids or the Tenerife Dragon tree, and `instant photographs' of the clouds above his retirement home in Clova, Ripon. His colorful records of the aurora polaris, and solar and terrestrial spectra all profited from his trained eye and his subtle mastery of the pen and the brush. As his paper on astronomical drawing, which we chose to reproduce in this volume, amply demonstrates, he was conversant in most of the print technology repertoire that the 19th century had to offer, and carefully selected the one most appropriate to each sujet. For instance, he chose mezzotint for the plates illustrating Maclear's observations of Halley's comet in 1835/36, so as to achieve a ``rich profundity of shadows, the deep obscurity of which is admirably adapted to reproduce those fine effects of chiaroscuro frequently found in works where the quantity of dark greatly predominates.'' The same expertise with which he tried to emulate Rembrandt's chiaroscuro effects he applied to assessing William and John Herschel's illustrations of nebulae, which appeared in print between 1811 and 1834. William Herschel's positive engraving, made partly by stippling and partly by a coarse mezzotint, receives sharp admonishment because of the visible ruled crossed lines in the background and the fact that ``the objects, which are also generally too light, [have] a much better definition than they really possess.'' On the other hand, John Herschel's illustration of nebulae and star clusters, given in negative, ``in which the lights are the darkest part of the

  8. Wire brush fastening device

    DOEpatents

    Meigs, Richard A.

    1995-01-01

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  9. Wire brush fastening device

    DOEpatents

    Meigs, R.A.

    1995-09-19

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

  10. 2. TYPICAL OVERHEAD WIRE CONSTRUCTION CURVE GUY WIRE ARRANGEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. TYPICAL OVERHEAD WIRE CONSTRUCTION - CURVE GUY WIRE ARRANGEMENT (ABANDONED WEST LEG OF WYE AT SIXTH AVENUE AND PINE STREET) - Yakima Valley Transportation Company Interurban Railroad, Trackage, Yakima, Yakima County, WA

  11. 37 CFR 1.152 - Design drawings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... are not permitted in a design drawing. Photographs and ink drawings are not permitted to be combined as formal drawings in one application. Photographs submitted in lieu of ink drawings in design...

  12. 37 CFR 1.152 - Design drawings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... are not permitted in a design drawing. Photographs and ink drawings are not permitted to be combined as formal drawings in one application. Photographs submitted in lieu of ink drawings in design...

  13. Flying wires at Fermilab

    SciTech Connect

    Gannon, J.; Crawford, C.; Finley, D.; Flora, R.; Groves, T.; MacPherson, M.

    1989-03-01

    Transverse beam profile measurement systems called ''Flying Wires'' have been installed and made operational in the Fermilab Main Ring and Tevatron accelerators. These devices are used routinely to measure the emittance of both protons and antiprotons throughout the fill process, and for emittance growth measurements during stores. In the Tevatron, the individual transverse profiles of six proton and six antiproton bunches are obtained simultaneously, with a single pass of the wire through the beam. Essential features of the hardware, software, and system operation are explained in the rest of the paper. 3 refs., 4 figs.

  14. Wired to freedom: Life science, public politics, and the case of Cochlear Implantation.

    PubMed

    Jepsen, Kim Sune; Bertilsson, T Margareta

    2017-02-01

    Cochlear Implantation is now regarded as the most successful medical technology. It carries promises to provide deaf/hearing impaired individuals with a technological sense of hearing and an access to participate on a more equal level in social life. In this article, we explore the adoption of cochlear implantations among Danish users in order to shed more light on their social and political implications. We situate cochlear implantation in a framework of new life science advances, politics, and user experiences. Analytically, we draw upon the notion of social imaginary and explore the social dimension of life science through a notion of public politics adopted from the political theory of John Dewey. We show how cochlear implantation engages different social imaginaries on the collective and individual levels and we suggest that users share an imaginary of being "wired to freedom" that involves new access to social life, continuous communicative challenges, common practices, and experiences. In looking at their lives as "wired to freedom," we hope to promote a wider spectrum of civic participation in the benefit of future life science developments within and beyond the field of Cochlear Implantation. As our empirical observations are largely based in the Scandinavian countries (notably Denmark), we also provide some reflections on the character of the technology-friendly Scandinavian welfare states and the unintended consequences that may follow in the wake of rapid technology implementation of life science in society.

  15. Children's Drawing

    ERIC Educational Resources Information Center

    Richardson, Marion

    2015-01-01

    In this article from 1936, author Marion Richardson begins by discussing how teachers have changed their approach to teaching drawing--from teaching students to draw still life and copy from objects to allowing children to use their own technique. She explains, "We have changed our methods, partly because we no longer think of art as…

  16. One hundred angstrom niobium wire

    NASA Technical Reports Server (NTRS)

    Cline, H. E.; Rose, R. M.; Wulff, J.

    1968-01-01

    Composite of fine niobium wires in copper is used to study the size and proximity effects of a superconductor in a normal matrix. The niobium rod was drawn to a 100 angstrom diameter wire on a copper tubing.

  17. Wiring for space applications program

    NASA Astrophysics Data System (ADS)

    Hammoud, Ahmad

    1994-01-01

    The insulation testing and analysis consists of: identifying and prioritizing NASA wiring requirements; selecting candidate wiring constructions; developing test matrix and formulating test program; managing, coordinating, and conducting tests; and analyzing and documenting data, establishing guidelines and recommendations.

  18. Drawing cure: children's drawings as a psychoanalytic instrument.

    PubMed

    Wittmann, Barbara

    2010-01-01

    This essay deals with the special case of drawings as psychoanalytical instruments. It aims at a theoretical understanding of the specific contribution made by children's drawings as a medium of the psychical. In the influential play technique developed by Melanie Klein, drawing continuously interacts with other symptomatic (play) actions. Nonetheless, specific functions of drawing within the play technique can be identified. The essay will discuss four crucial aspects in-depth: 1) the strengthening of the analysis's recursivity associated with the graphic artifact; 2) the opening of the analytic process facilitated by drawing; 3) the creation of a genuinely graphic mode of producing meaning that allows the child to develop a "theory" of the workings of his own psychic apparatus; and 4) the new possibilities of symbolization associated with the latter. In contrast to classical definitions of the psychological instrument, the child's drawing is a weakly structured tool that does not serve to reproduce psychic processes in an artificial, controlled setting. The introduction of drawing into the psychoanalytic cure is by no means interested in replaying past events, but in producing events suited to effecting a transformation of the synchronic structures of the unconscious.

  19. 6. Photocopy of drawing. (This drawing is an 8' x ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of drawing. (This drawing is an 8' x 10' enlargement from a 4' x 5' negative; 1942 drawing titled 'Mess Halls; Types M-B-T, M-C-T, M-D-T, M-E-T, M-G-T, M-H-T, M-I-T, M-K-T, M-L-T, M-M-T & M-N-T; Electrical,' Plan No. T.O. 700-6601, located at Directorate of Engineering and Housing, Fort McPherson.) - Fort McPherson, World War II Station Hospital, G. U. Treatment Unit Mess Hall, Thorne & Hood Avenues, Atlanta, Fulton County, GA

  20. 116. Photographic copy of drawing (25 June 1917, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    116. Photographic copy of drawing (25 June 1917, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 131. 1/64 inch to one foot. Schematic plan of the Merchandise Building, describing the type of construction of the different portions of the building and shows the layout of the railroad tracks around the building. At the date of this drawing the building had all the major additons complete (to Annex A, Annex B, and the Box Factory). SCHETMATIC FLOOR PLAN - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  1. 112. Photographic copy of drawing (1912, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    112. Photographic copy of drawing (1912, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). George C. Nimmons. 1/8 inch to one foot. This floor plan is the only original drawing for bays 11 and 12 (Grocery Building), constructed at the corner of Arthington (then called Harvard Street) and Central Park Avenue. The building was constructed in 1912 and designed by the firm of George C. Nimmons. This structure is on reinforced concrete construction. GROCERY BUILDING, BASEMENT FLOOR PLAN - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  2. 99. Photographic copy of drawing (15 March 1905, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    99. Photographic copy of drawing (15 March 1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows, E.C. and R.M. Shankland (Civil Engineers). 1/2 inch to one foot or as noted. Detail sheet includes wall section at the top of the tower. This drawing is excerpted from a blueprint set. TOWER PLANS AND DETAILS - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  3. 119. Photographic copy of drawing (26 April 1905, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    119. Photographic copy of drawing (26 April 1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Adams and Schwab. 1/4 inch to one foot. Section drawing with the relationship of the spiral chutes in bays B and G to the shipping area. SECTION THROUGH MERCHANDISE BUILDING LOOKING EAST SHOWING SYSTEM OF CONVEYORS IN SHIPPING DEPARTMENT - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  4. 9. Credit JPL. Photographic copy of drawing, engineering drawing showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Credit JPL. Photographic copy of drawing, engineering drawing showing structure of Test Stand 'A' (Building 4202/E-3) and its relationship to the Monitor Building or blockhouse (Building 4203/E-4) when a reinforced concrete machinery room was added to the west side of Test Stand 'A' in 1955. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Electrical Layout - Muroc, Test Stand & Refrigeration Equipment Room,' drawing no. E3/7-0, April 6, 1955. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Edwards Air Force Base, Boron, Kern County, CA

  5. Gaseous wire detectors

    SciTech Connect

    Va'vra, J.

    1997-08-01

    This article represents a series of three lectures describing topics needed to understand the design of typical gaseous wire detectors used in large high energy physics experiments; including the electrostatic design, drift of electrons in the electric and magnetic field, the avalanche, signal creation, limits on the position accuracy as well as some problems one encounters in practical operations.

  6. SCALING UNDERWATER EXPLODING WIRES

    DTIC Science & Technology

    heat of detonation of TNT in calories per gram. This scaling behavior extends the law of similarity six decades in terms of weight, from pounds to micropounds. The peak pressure for exploding-wire phenomena has been obtained from data and is emprically expressed as pm = 26,800 (cube root of W/R) to

  7. Basic Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This guide is designed to assist teachers conducting a foundation course to prepare students for additional courses of training for entry-level employment in either the residential or commercial and industrial wiring trades. Included in the guide are 17 instructional units and the following sections of information for teachers: guidelines in using…

  8. Residential Wiring. Revised.

    ERIC Educational Resources Information Center

    Taylor, Mark

    This competency-based curriculum guide contains materials for conducting a course in residential wiring. A technically revised edition of the 1978 publication, the guide includes 28 units. Each instructional unit includes some or all of the following basic components: performance objectives, suggested activities for teachers and students,…

  9. NewsWire, 2002.

    ERIC Educational Resources Information Center

    Byrom, Elizabeth, Ed.; Bingham, Margaret, Ed.; Bowman, Gloria, Ed.; Shoemaker, Dan, Ed.

    2002-01-01

    This document presents the 3 2002 issues of the newsletter "NewsWire," (volume 5). Issue Number One focuses on collaborative Web projects. This issue begins with descriptions of four individual projects: "iEARN"; "Operation RubyThroat"; "Follow the Polar Huskies!"; and "Log in Your Animal Roadkill!" Features that follow include: "Bringing the…

  10. One-wire thermocouple

    NASA Technical Reports Server (NTRS)

    Goodrich, W. D.; Staimach, C. J.

    1977-01-01

    Nickel alloy/constantan device accurately measures surface temperature at precise locations. Device is moderate in cost and simplifies fabrication of highly-instrumented seamless-surface heat-transfer models. Device also applies to metal surfaces if constantan wire has insulative coat.

  11. Debate: Wired versus Wireless.

    ERIC Educational Resources Information Center

    Meeks, Glenn; Nair, Prakash

    2000-01-01

    Debates the issue of investing in wiring schools for desktop computer networks versus using laptops and wireless networks. Included are cost considerations and the value of technology for learning. Suggestions include using wireless networks for existing schools, hardwiring computers for new construction, and not using computers for elementary…

  12. Improved wire chamber

    DOEpatents

    Atac, M.

    1987-05-12

    An improved gas mixture for use with proportional counter devices, such as Geiger-Mueller tubes and drift chambers. The improved gas mixture provides a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor. 2 figs.

  13. Residential Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Taylor, Mark; And Others

    This guide is designed to assist teachers conducting a course to prepare students for entry-level employment in the residential wiring trade. Included in the guide are six instructional units and the following sections of information for teachers: guidelines in using the unit components; academic and workplace skills classifications and…

  14. Reliable Wiring Harness

    NASA Technical Reports Server (NTRS)

    Gaspar, Kenneth C.

    1987-01-01

    New harness for electrical wiring includes plugs that do not loosen from vibration. Ground braids prevented from detaching from connectors and constrained so braids do not open into swollen "birdcage" sections. Spring of stainless steel encircles ground braid. Self-locking connector contains ratchet not only preventing connector from opening, but tightens when vibrated.

  15. Extending wire rope service life

    SciTech Connect

    Not Available

    1982-06-01

    Selecting the proper wire rope is not a simple procedure. Wire rope is a precision mining machine with scores of moving parts. It is therefore important for mining equipment users to know wire rope and how it is designed and constructed. Good lubrication and regular inspection is important for a safe and long service life.

  16. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  17. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  18. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  19. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  20. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  1. 25. Photographic copy of construction drawing 1957 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of construction drawing 1957 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevations, plans,and sections for galvanized-steel wall and roof cladding, dock nos. 491, 492, and 493. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  2. 102. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    102. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Section through train shed, including the elevation of the curved wall of the end bay. Opposite hand section provided in field record. NORTH ELEVATION - ANNEX A - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  3. 96. Photographic copy of drawing (February 1905, original drawing in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    96. Photographic copy of drawing (February 1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Elevation of the west face showing the original 1905 construction, where Annex A and B were built to a height of three floors. WEST ELEVATION - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  4. 106. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    106. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Section through annexes and train shed, with elevation of the nine story portion of warehouse. TRANSVERSE SECTION - ANNEX A AND ANNEX B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  5. 17. Photographic copy of drawing (4 November 1927, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of drawing (4 November 1927, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 198. Approximately 1/8 inch to 12 feet. Shows major buildings of complex without curb lines and block boundaries marked only at corners. SITE PLAN - Sears Roebuck & Company Mail Order Plant, Bounded by Lexington & Grenshaw Streets, Kedzie Avenue & Independence Boulevard, Chicago, Cook County, IL

  6. 105. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    105. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Shows elevation of the train shed, the curved fascade of Annex A, and Annex B before the Grocery Building was constructed. WEST ELEVATION - ANNEX A AND ANNEX B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  7. 103. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    103. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. South elevation adjacent to the railroad tracks; only the first three floors were built at that time. SOUTH ELEVATION - ANNEX A - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  8. 104. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    104. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. North elevation along Arthington Street (then Harvard Street); only the first three floors were built at that time. NORTH ELEVATION - ANNEX B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  9. 129. Photographic copy of drawing (24 June 1963, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    129. Photographic copy of drawing (24 June 1963, original drawing in Archives, Public Affairs Departmentm, Sears Merchandise Group, Hoffman Estates, Illinois). Swain and Meyers, Inc. 1/4 inch to one foot. Partial floor plan illustrating the layout of the large package handling area. Tables and equipment not present at the time of the survey are shown. SECOND FLOOR, SECTON B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  10. 23. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). TYPICAL WALL SECTION AND ELEVATION, TYPICAL DETAILS OF HEAD, SILL, BASE, JAMB, AND METAL DOOR FRAMES, DETAIL OF STONE COPING, AND STONE SILL ALTERNATE, LINTEL SCHEDULE, TECHWOOD PROJECT #1101, SHEET A-51. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  11. 15. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). DETAILS OF NORTH ELEVATION, STORE FRONT, SCREEN IN GENERAL WAITING ROOM, COUNTER IN RENTING OFFICE, AND COUNTER IN CASHIER'S OFFICE, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET A-57. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA

  12. 22. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). SECTION AND ELEVATION, TYPE 'A' STAIR AND ENTRY, SECTION AND ELEVATION, TYPE 'C' AND 'D' STAIR AND ENTRY, TECHWOOD PROJECT #1101, SHEET A-50. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA

  13. 113. Photographic copy of drawing (17 MAY 1916, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    113. Photographic copy of drawing (17 MAY 1916, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Elevation along the train shed. Second addition to Annex A. NORTH ELEVATION (ANNEX, BAYS L, M, N, AND O, FOR FLOORS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  14. 115. Photographic copy of drawing (17 May 1916, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    115. Photographic copy of drawing (17 May 1916, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Shows the curved end bay of the warehouse. Second addition to Annex A. WEST ELEVATION (ANNEX A, BAYS L, M, N, AND O, FOR FLOORS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  15. 114. Photographic copy of drawing (17 May 1916, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. Photographic copy of drawing (17 May 1916, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/8 inch to one foot. Elevation adjacent to the railroad tracks. Second addition to Annex A. SOUTH ELEVATION (ANNEX A, BAYS L, M, N, N, AND O, FOR FLOORS FOUR THROUGH NINE) - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  16. 98. Photographic copy of drawing (15 March 1905, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    98. Photographic copy of drawing (15 March 1905, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/2 inch to one foot or as noted Detail sheet includes elevation details at the top of the tower. TOWER PLANS AND DETAILS - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  17. Scaleup of powder metallurgy processed Nb-Al multifilamentary wire

    SciTech Connect

    Thieme, C.; Foner, S.; Otubo, J.; Pourrahimi, S.; Schwartz, B.; Zhang, H.

    1983-05-01

    Power metallurgy processed Nb-Al superconducting wires were fabricated from billets up to 45 mm o.d. with nominal areal reduction ratios, R, up to 2 X 10/sup 5/, Nb powder sizes from 40 to 300 ..mu..m from various sources, Al powder sizes from 9 to 75 ..mu..m, Al concentrations from 3 to 25 wt % Al and with a wide range of heat treatments. All the compacts used tap density powder in a Cu tube and swaging and/or rod rolling and subsequent wire drawing. Both single strand and bundled wires were made. Overall critical current densities, J /SUB c/, of 2 X 10/sup 4/ A/cm/sup 2/ at 14 T and 10/sup 4/ A/cm/sup 2/ at 16 T were achieved for 6 to 8 wt % Al in Nb.

  18. Advanced oil recovery technologies for improved recovery from slope basin clastic reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM. Quarterly technical progress report, October 1--December 31, 1995

    SciTech Connect

    1996-01-22

    Objective is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery and to transfer this technology to oil and gas producers in the Permian Basin. The demonstration plan includes developing a control area using standard reservoir management techniques and comparing the performance of the control area with an area developed using advanced management methods. Specific goals are (1) to demonstrate that a development drilling program and pressure maintenance program, based on advanced reservoir management methods, can significantly improve oil recovery compared with existing technology applications, and (2) to transfer the advanced technologies to oil and gas producers in the Permian Basin and elswhere in the US oil and gas industry. This is the first quarterly progress report on the project; results to date are summarized.

  19. HippoDraw and Hippoplotamus

    SciTech Connect

    Gravina, M.F.; Kunz, P.F.; Pavel, T.J.; Rensing, P.E.

    1992-02-01

    Hippo Draw is a result of research into finding better ways to visualize the kind of statistical data that is so common in high energy physics analyses. In these analyses, frequency distributions are visualized as histograms, contour plots, scatter plots, etc. Traditionally, one used a library of subroutines, called a histogram package, within one's analysis programs to create and display such distributions. HippoDraw is a NeXTstep application for viewing statistical data. It has several unique features which make viewing data distributions highly interactive. It also incorporates simple drawing tools. HippoDraw is written in Objective-C and uses the Hippoplotamus library package which handles the n-tuples and displays. Hippoplotamus is written in ANSI C. 4 refs.

  20. HippoDraw and Hippoplotamus

    SciTech Connect

    Gravina, M.F.; Kunz, P.F.; Pavel, T.J.; Rensing, P.E.

    1992-02-01

    Hippo Draw is a result of research into finding better ways to visualize the kind of statistical data that is so common in high energy physics analyses. In these analyses, frequency distributions are visualized as histograms, contour plots, scatter plots, etc. Traditionally, one used a library of subroutines, called a histogram package, within one`s analysis programs to create and display such distributions. HippoDraw is a NeXTstep application for viewing statistical data. It has several unique features which make viewing data distributions highly interactive. It also incorporates simple drawing tools. HippoDraw is written in Objective-C and uses the Hippoplotamus library package which handles the n-tuples and displays. Hippoplotamus is written in ANSI C. 4 refs.

  1. Nanofibers drawing and nanodevices assembly in poly(trimethylene terephthalate).

    PubMed

    Xing, Xiaobo; Wang, Yuqing; Li, Baojun

    2008-07-07

    We report flexible and elastic enough nanofibers with diameters down to 60 nm and lengths up to 500 mm, fabricated by one-step drawing process from molten poly(trimethylene terephthalate) (PTT), exhibiting high surface smoothness and length uniformity. A series of ultracompact devices (such as optical beam splitters, couplers, rings, resonators, and tweezer/scissor-shaped structures) and nanophotonic device arrays have been assembled by the PTT nanofibers. Quantitative studies demonstrate that the PTT nanofibers/nanofiber devices exhibit good guiding properties with low optical loss from visible to near infrared region. The results suggest that the PTT nanophotonic fibers/wires would be promising candidates in constructing miniaturized photonic devices and ultracompact photonic integrated circuits (PICs), and a one-step drawing as an alternative to the standard optical bench technique.

  2. Resistance to sliding of stainless steel multistranded archwires and comparison with single-stranded leveling wires.

    PubMed

    Rucker, Brian K; Kusy, Robert P

    2002-07-01

    The sliding mechanics of multistranded stainless steel (SS) wires were compared with single-stranded leveling wires in the passive and the active regions when dominated by classical friction and elastic binding, respectively. Tests were done under both dry and wet (human saliva) conditions. The round multistranded wires had 3- (triple) and 6-stranded (coax) configurations in nominal sizes of 15.5, 17.5, 19.5, and 21.5 mil; the rectangular wires had 3- (rect3) and 8-stranded (rect8) configurations in nominal sizes of 16 x 16, 16 x 22, 17 x 25, and 19 x 25 mil. While a ligature force of 150 g was applied and the second-order angulation was varied from -12 degrees to 12 degrees, each wire was translated relative to its bracket as the drawing force was digitally recorded. Linear regressions were fitted separately to the passive and the active regions. In the passive region, the kinetic coefficients of friction mu(k-FR) in the wet state were the same as, lower than, and higher than in the dry state for single-stranded SS, single-stranded nickel titanium (NiTi), and multistranded SS wires, respectively. Because the kinetic coefficients of friction were similar for multistranded and single-stranded SS wires, mu(k-FR) is a material property for SS and perhaps also for NiTi. In the active region, the frictional behaviors of multistranded SS wires compared with other leveling archwires are as follows: (1) coax wires had low friction, (2) triple and rect8 wires had midrange friction, and (3) rect3 wires had high friction. The coefficients of binding (mu(BI)) were not affected by saliva and were proportional to the wire stiffnesses. The resistance to sliding depended on wire stiffnesses to the extent that the differences in the mu(k-FR)'s of SS versus NiTi became unimportant shortly after binding occurred.

  3. Wire insulation defect detector

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R. (Inventor)

    2004-01-01

    Wiring defects are located by detecting a reflected signal that is developed when an arc occurs through the defect to a nearby ground. The time between the generation of the signal and the return of the reflected signal provides an indication of the distance of the arc (and therefore the defect) from the signal source. To ensure arcing, a signal is repeated at gradually increasing voltages while the wire being tested and a nearby ground are immersed in a conductive medium. In order to ensure that the arcing occurs at an identifiable time, the signal whose reflection is to be detected is always made to reach the highest potential yet seen by the system.

  4. Dental Arch Wire

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Straightening teeth is an arduous process requiring months, often years, of applying corrective pressure by means of arch wires-better known as brace-which may have to be changed several times in the course of treatment. A new method has been developed by Dr. George Andreasen, orthodontist and dental scientist at the University of Iowa. The key is a new type of arch wire material, called Nitinol, with exceptional elasticity which helps reduce the required number of brace changes. An alloy of nickel and titanium, Nitinol was originally developed for aerospace applications by the Naval Ordnance Laboratory, now the Naval Surface Weapons Laboratory, White Oaks, Maryland. NASA subsequently conducted additional research on the properties of Nitinol and on procedures for processing the metal.

  5. From wires to cosmology

    NASA Astrophysics Data System (ADS)

    Amin, Mustafa A.; Baumann, Daniel

    2016-02-01

    We provide a statistical framework for characterizing stochastic particle production in the early universe via a precise correspondence to current conduction in wires with impurities. Our approach is particularly useful when the microphysics is uncertain and the dynamics are complex, but only coarse-grained information is of interest. We study scenarios with multiple interacting fields and derive the evolution of the particle occupation numbers from a Fokker-Planck equation. At late times, the typical occupation numbers grow exponentially which is the analog of Anderson localization for disordered wires. Some statistical features of the occupation numbers show hints of universality in the limit of a large number of interactions and/or a large number of fields. For test cases, excellent agreement is found between our analytic results and numerical simulations.

  6. Investigation of mechanical properties of cryogenically treated music wire

    NASA Astrophysics Data System (ADS)

    Heptonstall, A.; Waller, M.; Robertson, N. A.

    2015-08-01

    It has been reported that treating music wire (high carbon steel wire) by cooling to cryogenic temperatures can enhance its mechanical properties with particular reference to those properties important for musical performance. We use such wire for suspending many of the optics in Advanced LIGO, the upgrade to LIGO—the Laser Interferometric Gravitational-Wave Observatory. Two properties that particularly interest us are mechanical loss and breaking strength. A decrease in mechanical loss would directly reduce the thermal noise associated with the suspension, thus enhancing the noise performance of mirror suspensions within the detector. An increase in strength could allow thinner wire to be safely used, which would enhance the dilution factor of the suspension, again leading to lower suspension thermal noise. In this article, we describe the results of an investigation into some of the mechanical properties of music wire, comparing untreated wire with the same wire which has been cryogenically treated. For the samples we studied, we conclude that there is no significant difference in the properties of interest for application in gravitational wave detectors.

  7. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Reynolds, L.; Tweed, H.

    1972-01-01

    The work performed entailed the design, development, construction and testing of a 4000 word by 18 bit random access, NDRO plated wire memory for use in conjunction with a spacecraft imput/output unit and central processing unit. The primary design parameters, in order of importance, were high reliability, low power, volume and weight. A single memory unit, referred to as a qualification model, was delivered.

  8. Superconducting magnet wire

    DOEpatents

    Schuller, Ivan K.; Ketterson, John B.; Banerjee, Indrajit

    1986-01-01

    A superconducting tape or wire with an improved critical field is formed of alternating layers of a niobium-containing superconductor such as Nb, NbTi, Nb.sub.3 Sn or Nb.sub.3 Ge with a thickness in the range of about 0.5-1.5 times its coherence length, supported and separated by layers of copper with each copper layer having a thickness in the range of about 170-600 .ANG..

  9. Printed wiring assembly cleanliness

    SciTech Connect

    Stephens, J.M.

    1992-12-01

    This work installed a product cleanliness test capability in a manufacturing environment. A previously purchased testing device was modified extensively and installed in a production department. The device, the testing process, and some soldering and cleaning variables were characterized to establish their relationship to the device output. The characterization provided information which will be required for cleanliness testing to be an adequate process control of printed wiring assembly soldering and cleaning processes.

  10. Magnetoconductance of quantum wires

    NASA Astrophysics Data System (ADS)

    Ferreira, Gerson J.; Sammarco, Filipe; Egues, Carlos

    2010-03-01

    At low temperatures the conductance of a quantum wires exhibit characteristic plate-aus due to the quantization of the transverse modes [1]. In the presence of high in-plane magnetic fields these spin-split transverse modes cross. Recently, these crossings were observed experimentally [2] via measurements of the differential conductance as a function of the gate voltage and the in-plane magnetic-field. These show structures described as either anti-crossings or magnetic phase transitions. Motivated by our previous works on magnetotransport in 2DEGs via the Spin Density Functional Theory (SDFT) [3], here we propose a similar model to investigate the magnetoconductance of quantum wires. We use (i) the SDFT via the Kohn-Sham self-consistent scheme within the local spin density approximation to obtain the electronic structure and (ii) the Landauer-Buettiker formalism to calculate the conductance of a quantum wire. Our results show qualitative agreement with the data of Ref. [2]. [1] B. J. van Wees et al., Phys. Rev. Lett. 60, 848 (1988). [2] A. C. Graham et al., Phys. Rev. Lett. 100, 226804 (2008). [3] H. J. P. Freire, and J. C. Egues, Phys. Rev. Lett. 99, 026801 (2007); G. J. Ferreira, and J. Carlos Egues, J. Supercond. Nov. Mag., in press; G. J. Ferreira, H. J. P. Freire, J. Carlos Egues, submitted.

  11. Dual wire welding torch and method

    DOEpatents

    Diez, Fernando Martinez; Stump, Kevin S.; Ludewig, Howard W.; Kilty, Alan L.; Robinson, Matthew M.; Egland, Keith M.

    2009-04-28

    A welding torch includes a nozzle with a first welding wire guide configured to orient a first welding wire in a first welding wire orientation, and a second welding wire guide configured to orient a second welding wire in a second welding wire orientation that is non-coplanar and divergent with respect to the first welding wire orientation. A method of welding includes moving a welding torch with respect to a workpiece joint to be welded. During moving the welding torch, a first welding wire is fed through a first welding wire guide defining a first welding wire orientation and a second welding wire is fed through a second welding wire guide defining a second welding wire orientation that is divergent and non-coplanar with respect to the first welding wire orientation.

  12. Wiedemann effect of Fe—Ga based magnetostrictive wires

    NASA Astrophysics Data System (ADS)

    Li, Ji-Heng; Gao, Xue-Xu; Zhu, Jie; Bao, Xiao-Qian; Cheng, Liang; Xie, Jian-Xin

    2012-08-01

    (Fe83Ga17)98Cr2 wires each with a diameter of 0.7 mm are prepared by hot swaging and warm drawing from the casting rods directly, because the ductility of Fe83Ga17 alloy is improved by adding Cr element. The Wiedemann twists and dependences on magnetostrictions of Fe83Ga17 and (Fe83Ga17)98Cr2 wires are investigated. The largest observed Wiedemann twists of 245 s·cm-1 and 182 s·cm-1 are detected in the annealed Fe83Ga17 and (Fe83Ga17)98Cr2 wires, respectively. The magnetostrictions of the annealed Fe83Ga17 and (Fe83Ga17)98Cr2 wires are 160 ppm and 107 ppm, respectively. The maximum of the Wiedemann twist increases with magnetostriction increasing. However the magnetostriction is just one important factor that affects the Wiedemann effect of alloy wire, and the relationship between magnetostriction and Wiedemann effect is a complex function rather than a simple function.

  13. Fine-Filament MgB2 Superconductor Wire

    NASA Technical Reports Server (NTRS)

    Cantu, Sherrie

    2015-01-01

    Hyper Tech Research, Inc., has developed fine-filament magnesium diboride (MgB2) superconductor wire for motors and generators used in turboelectric aircraft propulsion systems. In Phase I of the project, Hyper Tech demonstrated that MgB2 multifilament wires (<10 micrometers) could reduce alternating current (AC) losses that occur due to hysteresis, eddy currents, and coupling losses. The company refined a manufacturing method that incorporates a magnesium-infiltration process and provides a tenfold enhancement in critical current density over wire made by a conventional method involving magnesium-boron powder mixtures. Hyper Tech also improved its wire-drawing capability to fabricate fine multifilament strands. In Phase II, the company developed, manufactured, and tested the wire for superconductor and engineering current density and AC losses. Hyper Tech also fabricated MgB2 rotor coil packs for a superconducting generator. The ultimate goal is to enable low-cost, round, lightweight, low-AC-loss superconductors for motor and generator stator coils operating at 25 K in next-generation turboelectric aircraft propulsion systems.

  14. Prosthetic leg powered by MR brake and SMA wires

    NASA Astrophysics Data System (ADS)

    Nguyen, The; Munguia, Vicente; Calderon, Jose

    2014-04-01

    Current knee designs for prosthetic legs rely on electric motors for both moving and stationary states. The electric motors draw an especially high level of current to sustain a fixed position. The advantage of using magnetorheological (MR) fluid is that it requires less current and can have a variable braking torque. Besides, the proposed prosthetic leg is actuated by NiTinol wire, a popular shape memory alloy (SMA). The incorporation of NiTinol gives the leg more realistic weight distribution with appropriate arrangement of the batteries and wires. The prosthesis in this research was designed with MR brake as stopping component and SMA wire network as actuating component at the knee. The MR brake was designed with novel non-circular shape for the rotor that improved the braking torque while minimizing the power consumption. The design also helped simplify the control of braking process. The SMA wire network was design so that the knee motion was actively rotated in both directions. The SMA wires were arranged and played very similar role as the leg's muscles. The study started with the overall solid design of the knee including both MR and SMA parts. Theoretical models were derived and programmed in Simulink for both components. The simulation was capable of predicting the power required for moving the leg or hold it in a fixed position for a certain amount of time. Subsequently, the design was prototyped and tested to validate the theoretical prediction. The theoretical models were updated accordingly to correlate with the experimental data.

  15. Haptics and projection: drawings by Tracy, a blind adult.

    PubMed

    Kennedy, John M; Igor, Juricevic

    2003-01-01

    Outline drawings in a raised form were made by a blind woman, Tracy, who has been blind from very early in life. Highly practiced in drawing, she reports she is largely self-taught. To invoke matters of projection, she was asked to represent an object with faces slanting away from the observer, a fixed array from different vantage points, and sets of objects in depth. In particular, she drew a cube balanced on a vertex, three objects from different vantage points, receding rows of glasses, and a house. Her drawings included features of parallel and polar projection. Her use of these features may reflect an appreciation of direction from a vantage point, which observers deal with via haptics in everyday tasks. Tracy may have advanced drawing-development skills common to the blind and the sighted.

  16. Metering Wheel-Wire Track Wire Boom Deployment Mechanism

    NASA Technical Reports Server (NTRS)

    Granoff, Mark S.

    2014-01-01

    The NASA MMS Spin Plane Double Probe (SDP) Deployer utilizes a helical path, rotating Metering Wheel and a spring loaded Wire "Holding" Track to pay out a "fixed end" 57 meter x 1.5 mm diameter Wire Boom stored between concentric storage cylinders. Unlike rotating spool type storage devices, the storage cylinders remain stationary, and the boom wire is uncoiled along the length of the cylinder via the rotation of the Metering Wheel. This uncoiling action avoids the need for slip-ring contacts since the ends of the wire can remain stationary. Conventional fixed electrical connectors (Micro-D type) are used to terminate to operational electronics.

  17. 123. Photographic copy of drawing (6 October 1916, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. Photographic copy of drawing (6 October 1916, original drawing in Archives, Office of the Building, Administration Building, Sears Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 213 (engineer unknown). 1/16 inch to one foot. Partial fourth/fifth floor plan and schematic building section showing the relationship of the gravity conveyors in the warehouse space to the spiral chutes. GENERAL LAYOUT OF ALL MDSE DEPT. CONVEYORS - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  18. 18. Photographic copy of drawing (16 October 1960, original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of drawing (16 October 1960, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Prepared by Sears Departments 730 and 824. One inch to 100 feet. Area shown extends from the Eisenhower Expressway on the north to Roosevelt Road on the south, including all the major buildings of the complex except for parking garages and the Catalogue Operations Building added circa 1964. PLOT OF SEARS COMPLEX - HOMAN-ARTHINGTON AREA - Sears Roebuck & Company Mail Order Plant, Bounded by Lexington & Grenshaw Streets, Kedzie Avenue & Independence Boulevard, Chicago, Cook County, IL

  19. 101. Photographic copy of drawing (1905, original drawing in Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    101. Photographic copy of drawing (1905, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Nimmons and Fellows. 1/8 inch to one foot. First floor plan for the portions of Annex A and Annex B built in 1905 (three floor only) along with the nine floors along Homan Avenue. FIRST FLOOR PLAN - ANNEX A AND ANNEX B - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL

  20. The Drag of Streamline Wires

    NASA Technical Reports Server (NTRS)

    Jacobs, Eastman N

    1933-01-01

    Preliminary results are given of drag tests of streamline wires. Full-size wires were tested over a wide range of speeds in the N.A.C.A. high speed tunnel. The results are thus directly applicable to full-scale problems and include any compressibility effects encountered at the higher speeds. The results show how protuberances may be employed on conventional streamline wires to reduce the drag, and also show how the conventional wires compare with others having sections more like strut or symmetrical airfoil sections. Because the new wire sections developed are markedly superior aerodynamically to conventional wires, it is recommended that some of them be tested in service in order to investigate their relative susceptibility to vibration and to fatigue failure.

  1. Modification of guide wire for 22-gauge safe guide.

    PubMed

    Suzuki, T; Nishiyama, J; Hasegawa, J; Ito, K; Takiguchi, M; Takahashi, M; Oda, M

    2001-07-01

    Safe guide is a central venous catheterization kit that serves as both pilot needle and introducer. With a single puncture, a guide wire can be introduced by inserting it through the side port of the 22-gauge needle. The advantage is that this needle can be placed within a blood vessel using no more force than is required to insert a pilot needle. However, the 0.018-inch guide wire is vulnerable to kinks and locking. Because the tip has been shaped into a sharp J-shaped angle, it can kink at the puncture site, and locking sometimes occurs when the guide wire is passed through the side port of the needle, or when the dilator is introduced. In order to resolve these issues, we modified the device by making an experimental guide wire with a gentler angle. In addition, we fortified the body of the wire without altering its thickness. We then investigated the effectiveness of our modifications. The subjects of the study were 120 patients, who required central venous catheterization. They were divided into 2 groups. The original J-type guide wire was used in one group (Group A: n = 60) and the modified guide wire in the other group (Group B: n = 60). Catheters were introduced by right internal jugular vein puncture. We observed the following: 1) incidence of back-flow appearing at withdrawal of the needle without back-flow during advancement, 2) incidence of kinking or locking of the guide wire when it was passed through the side port, 3) incidence of kinking of the guide wire at the puncture site when introducing the dilator, and 4) complications. The results were as follows: 1) back-flow appeared upon withdrawal in 3.4% of both groups; 2) kinking and locking occurred when passing the guide wire through the side port of the Safe guide needle in 16.7% of Group A and 1.7% of Group B; 3) kinking of the guide wire occurred when introducing the dilator in 5 % of Group A in contrast to 0% in Group B; 4) the only complication caused by the passing of the guide wire was

  2. Twin-Axial Wire Antenna

    DTIC Science & Technology

    2015-08-06

    08-2015 Publication Twin-Axial Wire Antenna David A. Tonn Naval Under Warfare Center Division, Newport 1176 Howell St., Code 00L, Bldg 102T...Approved for Public Release Distribution is unlimited Attorney Docket No. 300030 1 of 10 TWIN-AXIAL WIRE ANTENNA STATEMENT OF GOVERNMENT INTEREST...2 of 10 length of the antenna wire . This creates a high pass filter in the antenna and prevents current flow in the VLF/LF bands. [0005] U.S

  3. Photofabricated Wire-Grid Polarizers

    NASA Technical Reports Server (NTRS)

    Siegel, Peter H.; Dengler, Robert J.

    1992-01-01

    Freestanding metallic grids for use as polarizers for electromagnetic radiation at millimeter and submillimeter wavelengths made by simple modification of designs of freestanding square- and nearly-square cell metallic grids, according to proposal. Cross wires provide mechanical support, but distance between cross wires made greater than one wavelength so cross wires have little effect on polarizing characteristics of grid. Possible to fabricate grids commercially for frequencies up to several terahertz.

  4. Identification of the mechanisms responsible for static strain ageing in heavily drawn pearlitic steel wires

    NASA Astrophysics Data System (ADS)

    Lamontagne, A.; Kleber, X.; Massardier-Jourdan, V.; Mari, D.

    2014-08-01

    The microstructural changes occurring during drawing and ageing in pearlitic steel wires have been studied using the thermoelectric power (TEP) measurements combined with atom probe tomography (APT) and differential scanning calorimetry (DSC). APT analysis confirmed that cementite dissolution occurs during the cold-drawing process. The high sensitivity of TEP to solute atoms allowed two ageing mechanisms to be identified, both related to a redistribution of carbon atoms. The complementary use of tensile tests and DSC confirmed these results.

  5. Subminiature Hot-Wire Probes

    NASA Technical Reports Server (NTRS)

    Westphal, R. V.; Lemos, F. R.; Ligrani, P. M.

    1989-01-01

    Class of improved subminiature hot-wire flow-measuring probes developed. Smaller sizes yield improved resolution in measurements of practical aerodynamic flows. Probe made in one-wire, two-perpendicular-wire, and three-perpendicular-wire version for measurement of one, two, or all three components of flow. Oriented and positioned on micromanipulator stage and viewed under microscope during fabrication. Tested by taking measurements in constant-pressure turbulent boundary layer. New probes give improved measurements of turbulence quantities near surfaces and anisotropies of flows strongly influence relative errors caused by phenomena related to spatial resolution.

  6. Plasma Formation Around Single Wires

    NASA Astrophysics Data System (ADS)

    Duselis, Peter U.; Kusse, Bruce R.

    2002-12-01

    At Cornell's Laboratory of Plasma Studies, single wires of various metals were exploded using a ˜250 ns pulser with a rise time of ˜20 A/ns. It was found that the wires first experience a resistive heating phase that lasts 50-80 ns before a rapid collapse of voltage. From that point on, the voltage across the wire was negligible while the current through the wire continued to increase. We attribute this voltage collapse to the formation of plasma about the wire. Further confirmation of this explanation will be presented along with new experimental data describing preliminary spectroscopy results, the expansion rate of the plasma, and current flow along the wire as a function of radius. The resistance of the wire-electrode connection will be shown to significantly affect the energy deposition. Various diagnostics were used to obtain these experiments. Ultraviolet sensitive vacuum photodiodes and a framing camera with an 8 ns shutter were used to detect and measure the width of the visible light emitted by the plasma. A special wire holder was constructed that allowed the transfer of current from the wire to the surrounding plasma to be observed.

  7. Coaching and Counseling: Where To Draw the Line.

    ERIC Educational Resources Information Center

    Colvert, Audra L.

    Examining the role of the forensics coach as counselor, this paper attempts to define the role more clearly and offers guidelines and suggestions concerning where to draw the line between coaching and counseling "forensicators." The paper advances the premise that coaches have many responsibilities which include significant dimensions of…

  8. Intergalactic Encounters: Desire and the Political Immediacy of Children's Drawing

    ERIC Educational Resources Information Center

    Schulte, Christopher M.

    2015-01-01

    The author of this article creates a semblance between Deleuze and Guattari's conception of a politics of desire and the four realities, as outlined by Brent and Marjorie Wilson. By making this theoretical move, the author advances the idea that children's drawing unfolds from one moment to the next through the assemblages of desire that are most…

  9. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Fouling wires. 234.231 Section 234.231..., Inspection, and Testing Maintenance Standards § 234.231 Fouling wires. Each set of fouling wires in a highway... single duplex wire with single plug acting as fouling wires is prohibited. Existing installations...

  10. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Fouling wires. 234.231 Section 234.231..., Inspection, and Testing Maintenance Standards § 234.231 Fouling wires. Each set of fouling wires in a highway... single duplex wire with single plug acting as fouling wires is prohibited. Existing installations...

  11. Deep drawing of uranium metal

    SciTech Connect

    Jackson, R J; Lundberg, M R

    1987-01-19

    A procedure was developed to fabricate uranium forming blanks with high ''draw-ability'' so that cup shapes could be easily and uniformly deep drawn. The overall procedure involved a posttreatment to develop optimum mechanical and structural properties in the deep-drawn cups. The fabrication sequence is casting high-purity logs, pucking cast logs, cross-rolling pucks to forming blanks, annealing and outgassing forming blanks, cold deep drawing to hemispherical shapes, and stress relieving, outgassing, and annealing deep-drawn parts to restore ductility and impart dimensional stability. The fabrication development and the resulting fabrication procedure are discussed in detail. The mechanical properties and microstructural properties are discussed.

  12. Neural wiring optimization.

    PubMed

    Cherniak, Christopher

    2012-01-01

    Combinatorial network optimization theory concerns minimization of connection costs among interconnected components in systems such as electronic circuits. As an organization principle, similar wiring minimization can be observed at various levels of nervous systems, invertebrate and vertebrate, including primate, from placement of the entire brain in the body down to the subcellular level of neuron arbor geometry. In some cases, the minimization appears either perfect, or as good as can be detected with current methods. One question such best-of-all-possible-brains results raise is, what is the map of such optimization, does it have a distinct neural domain?

  13. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Carpenter, K. H.

    1974-01-01

    The design, construction, and test history of a 4096 word by 18 bit random access NDRO Plated Wire Memory for use in conjunction with a spacecraft input/output and central processing unit is reported. A technical and functional description is given along with diagrams illustrating layout and systems operation. Test data is shown on the procedures and results of system level and memory stack testing, and hybrid circuit screening. A comparison of the most significant physical and performance characteristics of the memory unit versus the specified requirements is also included.

  14. Proceedings of International Wire and Cable Symposium (24th), Held at Cherry Hill, New Jersey, on November 18, 19 and 20, 1975

    DTIC Science & Technology

    1975-11-01

    as compared with that of solid insula- tion of low density polyethylene were the severer wire draw down, higher sensitivity of various...requirements. 1) Low voltage wire (600 V class) which has a proof layer between conductor and polyethylene insulation. The special fire-proof layer is...changing the structure. It is necessary to develop methods other than those used for the low voltage fire -proof wire and cable. 3.2. Thp

  15. Improved superconducting magnet wire

    DOEpatents

    Schuller, I.K.; Ketterson, J.B.

    1983-08-16

    This invention is directed to a superconducting tape or wire composed of alternating layers of copper and a niobium-containing superconductor such as niobium of NbTi, Nb/sub 3/Sn or Nb/sub 3/Ge. In general, each layer of the niobium-containing superconductor has a thickness in the range of about 0.05 to 1.5 times its coherence length (which for Nb/sub 3/Si is 41 A) with each copper layer having a thickness in the range of about 170 to 600 A. With the use of very thin layers of the niobium composition having a thickness within the desired range, the critical field (H/sub c/) may be increased by factors of 2 to 4. Also, the thin layers of the superconductor permit the resulting tape or wire to exhibit suitable ductility for winding on a magnet core. These compositions are also characterized by relatively high values of critical temperature and therefore will exhibit a combination of useful properties as superconductors.

  16. Conservation of Drawings and Prints

    ERIC Educational Resources Information Center

    King, Antoinette

    1972-01-01

    Some of the basic techniques of preserving and restoring prints and drawings are outlined. Examination, dry cleaning, stain removal, mending, backing removal, and lining are discussed, as well as aspects of the complexity of bleaching, types and nature of some stains and discolorations, and materials of poor quality used by many framers. (Author)

  17. Metric Supplement to Technical Drawing.

    ERIC Educational Resources Information Center

    Henschel, Mark

    This manual is intended for use in training persons whose vocations involve technical drawing to use the metric system of measurement. It could be used in a short course designed for that purpose or for individual study. The manual begins with a brief discussion of the rationale for conversion to the metric system. It then provides a…

  18. Analysing Children's Drawings: Applied Imagination

    ERIC Educational Resources Information Center

    Bland, Derek

    2012-01-01

    This article centres on a research project in which freehand drawings provided a richly creative and colourful data source of children's imagined, ideal learning environments. Issues concerning the analysis of the visual data are discussed, in particular, how imaginative content was analysed and how the analytical process was dependent on an…

  19. SpaceWire Plug and Play

    NASA Technical Reports Server (NTRS)

    Rakow, Glenn; McGuirk, Patrick; Kimmery, Clifford; Jaffe, Paul

    2006-01-01

    The ability to rapidly deploy inexpensive satellites to meet tactical goals has become an important goal for military space systems. In fact, Operationally Responsive Space (ORS) has been in the spotlight at the highest levels. The Office of the Secretary of Defense (OSD) has identified that the critical next step is developing the bus standards and modular interfaces. Historically, satellite components have been constructed based on bus standards and standardized interfaces. However, this has not been done to a degree, which would allow the rapid deployment of a satellite. Advancements in plug-and-play (PnP) technologies for terrestrial applications can serve as a baseline model for a PnP approach for satellite applications. Since SpaceWire (SpW) has become a de facto standard for satellite high-speed (greater than 200Mbp) on-board communications, it has become important for SpW to adapt to this Plug and Play (PnP) environment. Because SpW is simply a bulk transport protocol and lacks built-in PnP features, several changes are required to facilitate PnP with SpW. The first is for Host(s) to figure out what the network looks like, i.e., how pieces of the network, routers and nodes, are connected together; network mapping, and to receive notice of changes to the network. The second is for the components connected to the network to be understood so that they can communicate. The first element, network topology mapping & change of status indication, is being defined (topic of this paper). The second element describing how components are to communicate has been defined by ARFL with the electronic data sheets known as XTEDS. The first element, network mapping, is recent activities performed by Air Force Research Lab (ARFL), Naval Research Lab (NRL), NASA and US industry (Honeywell, Clearwater, FL, and others). This work has resulted in the development of a protocol that will perform the lower level functions of network mapping and Change Of Status (COS) indication

  20. Finite element modeling of the powder-in- tube process for manufacture of BSCCO-2212 superconducting wires

    NASA Astrophysics Data System (ADS)

    Shah, R.; Tangrila, S.; Rachakonda, S.; Thirukkonda, M.

    1995-12-01

    High-temperature superconductors have recently attracted a great deal of attention owing to their potential use in a variety of applications including power generators, superconducting magnets for mine sweepers or ship propulsion motors, and magnetic levitation transportation systems. The powder-in-tube (PIT) process has emerged as one of the most promising and economically feasible techniques to produce long lengths high-Tc oxide based superconducting wires. The PIT method involves multi-pass wire drawing followed by rolling and heat treatment. This work focuses on the development of finite element models to simulate the PIT drawing process for fabrication of silver sheathed Bi-2212 superconducting wires. The numerical models were used to predict the density of the oxide powder, the wire drawing forces, and the silver-oxide ratio during drawing. A cap-type pressure dependent constitutive equation was implemented in the model to simulate the powder behavior. The model incorporated experimentally obtained material data for the silver and powder. Data from wire drawing experiments were used to verify model predictions.