Science.gov

Sample records for aging management program

  1. Nondestructive Examination for Nuclear Power Plant Cable Aging Management Programs

    SciTech Connect

    Glass, Samuel W.; Fifield, Leonard S.

    2016-01-01

    Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable’s ability to perform safely over the initial 40 year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found in an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program (AMP) to justify cable performance under normal operation as well as accident conditions. This paper addresses various NDE technologies that constitute the essence of an acceptable aging management program.

  2. Titan II. Reliability and Aging Surveillance Program (RASP) Management Plan

    DTIC Science & Technology

    1974-12-02

    following organizations: SAC OGDEN ALC * LGBT *MMER XPQM *MMCO BM MMCP V DEFS MMCR DOKM MMCT DOTM MMEW ~- V -~ -DOXX S • ,. _ X PQ T * Indicates...age and service on the Titan II Weapon System. This responsibility includes publication and dissemina- tion of reports and information. CINCSAC/ LGBT ...semiannually by the scheduling subcommittee composed of CINCSAC/ LGBT and Ogden ALC/ MMCO and MMER. LGBT will have primary responsibility for scheduling

  3. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 2

    SciTech Connect

    Not Available

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities. This Part 2 includes chapters on implementation guidance for operational configuration management, implementation guidance for design reconstitution, and implementation guidance for material condition and aging management. Appendices are included on design control, examples of design information, conduct of walkdowns, and content of design information summaries.

  4. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Generators AGENCY: Nuclear Regulatory Commission. ACTION: Request for public comment. SUMMARY: The U.S...), LR-ISG-2011-02, ``Aging Management Program for Steam Generators,'' for public comment. This Draft LR... steam generator aging. The Draft LR-ISG revises the NRC staff's aging management...

  5. Light Water Reactor Sustainability Program: Evaluation of Localized Cable Test Methods for Nuclear Power Plant Cable Aging Management Programs

    SciTech Connect

    Glass, Samuel W.; Fifield, Leonard S.; Hartman, Trenton S.

    2016-05-30

    This Pacific Northwest National Laboratory (PNNL) milestone report describes progress to date on the investigation of nondestructive test (NDE) methods focusing particularly on local measurements that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As NPPs consider applying for second, or subsequent, license renewal (SLR) to extend their operating period from 60 years to 80 years, it important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs (AMPs) to assure continued safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program is directed toward the more demanding challenge of assuring the cable function under accident or DBE. Most utilities already have a program associated with their first life extension from 40 to 60 years. Regrettably, there is neither a clear guideline nor a single NDE that can assure cable function and integrity for all cables. Thankfully, however, practical implementation of a broad range of tests allows utilities to develop a practical program that assures cable function to a high degree. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB is a destructive test so the test programs must apply an array of other NDE tests to assure or infer the overall set of cable’s system integrity. These cable NDE programs vary in rigor and methodology. As the industry gains experience with the efficacy of these programs, it is expected that implementation practice will converge to a more common approach. This report addresses the range of local NDE cable tests that are

  6. Bulk Electrical Cable Non-Destructive Examination Methods for Nuclear Power Plant Cable Aging Management Programs

    SciTech Connect

    Glass, Samuel W.; Jones, Anthony M.; Fifield, Leonard S.; Hartman, Trenton S.

    2016-09-01

    This Pacific Northwest National Laboratory milestone report describes progress to date on the investigation of nondestructive test methods focusing particularly on bulk electrical test methods that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As nuclear power plants consider applying for second, or subsequent, license renewal to extend their operating period from 60 years to 80 years, it is important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs to assure continued safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program, however, is directed toward the more demanding challenge of assuring the cable function under accident or DBE. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB, however, is a destructive test so the test programs must apply an array of other nondestructive examination (NDE) tests to assure or infer the overall set of cable’s system integrity. Assessment of cable integrity is further complicated in many cases by vendor’s use of dissimilar material for jacket and insulation. Frequently the jacket will degrade more rapidly than the underlying insulation. Although this can serve as an early alert to cable damage, direct test of the cable insulation without violating the protective jacket becomes problematic. This report addresses the range of bulk electrical NDE cable tests that are or could be practically implemented in a field-test situation with a particular focus on frequency domain reflectometry (FDR). The FDR test method offers numerous advantages

  7. Role of EPA in Asset Management Research – The Aging Water Infrastructure Research Program

    EPA Science Inventory

    This slide presentation provides an overview of the EPA Office of Research and Development’s Aging Water infrastructure Research Program (AWIRP). The research program origins, goals, products, and plans are described. The research program focuses on four areas: condition asses...

  8. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    NASA Astrophysics Data System (ADS)

    Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.

    2011-04-01

    In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  9. Aging is not programmed

    PubMed Central

    Blagosklonny, Mikhail V

    2013-01-01

    Aging is not and cannot be programmed. Instead, aging is a continuation of developmental growth, driven by genetic pathways such as mTOR. Ironically, this is often misunderstood as a sort of programmed aging. In contrast, aging is a purposeless quasi-program or, figuratively, a shadow of actual programs. “The brightest flame casts the darkest shadow.” -George Martin PMID:24240128

  10. International Forum for Reactor Aging Management (IFRAM)

    SciTech Connect

    Bond, Leonard J.

    2010-11-01

    The Nuclear Regulatory Commission has undertaken a program to lay the groundwork for defining proactive actions to manage degradation of materials in light water reactors (LWRs). This article discusses the international forum for reactor aging management.

  11. Effective maintenance practices to manage system aging

    SciTech Connect

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies.

  12. Structural aging program status report

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.; Graves, H.L. III

    1994-12-31

    Research is being conducted at the Oak Ridge National Laboratory under Nuclear Regulatory Commission (USNRC) sponsorship to address aging management of safety-related concrete structures. Documentation is being prepared to provide the USNRC with potential structural safety issues and acceptance criteria for use in continued service evaluations of nuclear power plants. Program accomplishments have included development of the Structural Materials Information Center containing data and information on the time variation of 144 material properties under the influence of pertinent environmental stressors or aging factors, performance assessments of reinforced concrete structures in several United Kingdom nuclear power facilities, evaluation of European and North American repair practices for concrete, an evaluation of factors affecting the corrosion of metals embedded in concrete, and application of the time-dependent reliability methodology to reinforced concrete flexure and shear structural elements to investigate the role of in-service inspection and repair on their probability of failure.

  13. Structural aging program status report

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.

    1995-04-01

    Research is being conducted at the Oak Ridge National Laboratory (ORNL) under U.S. Nuclear Regulatory Commission (USNRC) sponsorship to address aging management of safety-related concrete structures. Documentation is being prepared to provide the USNRC with potential structural safety issues and acceptance criteria for use in continued service evaluations of nuclear power plants. Program accomplishments have included development of the Structural Materials Information Center containing data and information of the time variation of 144 material properties under the influence of pertinent environmental stressors of aging factors, performance assessments of reinforced concrete structures in several United Kingdom nuclear power facilities, evaluation of European and North American repair practices for concrete, an evaluation of factors affecting the corrosion of metals embedded in concrete, and application of the time-dependent reliability methodology to reinforced concrete flexure and shear structural elements to investigate the role of in-service inspection and repair on their probability of failure.

  14. Joint Program Management Handbook

    DTIC Science & Technology

    1994-12-01

    the Engieermg and Manufacuring Devopment Phase. Nfilestoae HI- Develommen Annros Devopment approval marks a significant step for any program, but it is...to review concept formulaton. Systems Engilneertn As with service programs, systems engineering in joint program management is an essential tool . I...MANAGEMENT HANDBOOK On=e wd Umawtaiutt As discussed in Chapter 7, systems analysis of relationships is a usef tool for joint program managers. The joint

  15. USEPA ORD Aging Water Infrastructure Research Program

    EPA Science Inventory

    This presentation describes research that is being conducted under the U.S. Environmental Protection Agency’s Aging Water Infrastructure (AWI) Research Program, which will help U.S. water infrastructure to be more effectively and sustainably managed. The AWI research program see...

  16. Managing Mentoring Programs.

    ERIC Educational Resources Information Center

    IUME Briefs, 1992

    1992-01-01

    Some programs for helping at-risk youth achieve excellent results, while others do not. One reason for program success can be proper management. Mentoring is a promising strategy for helping at-risk youth. Planners who want to create effective mentoring programs should look at the implementation experiences of other youth programs. Evaluations…

  17. Space age management for social problems

    NASA Technical Reports Server (NTRS)

    Levine, A. L.

    1973-01-01

    Attempts to apply space age management to social problems were plagued with difficulties. Recent experience in the State of Delaware and in New York City, however, indicate new possibilities. Project management as practiced in NASA was applied with promising results in programs dealing with housing and social services. Such applications are feasible, according to recent research, because project management utilizes social and behavioral approaches, as well as advanced management tools, such as PERT, to achieve results.

  18. The effectiveness of an aged care specific leadership and management program on workforce, work environment, and care quality outcomes: design of a cluster randomised controlled trial

    PubMed Central

    2013-01-01

    Background A plethora of observational evidence exists concerning the impact of management and leadership on workforce, work environment, and care quality. Yet, no randomised controlled trial has been conducted to test the effectiveness of leadership and management interventions in aged care. An innovative aged care clinical leadership program (Clinical Leadership in Aged Care − CLiAC) was developed to improve managers’ leadership capacities to support the delivery of quality care in Australia. This paper describes the study design of the cluster randomised controlled trial testing the effectiveness of the program. Methods Twenty-four residential and community aged care sites were recruited as managers at each site agreed in writing to participate in the study and ensure that leaders allocated to the control arm would not be offered the intervention program. Sites undergoing major managerial or structural changes were excluded. The 24 sites were randomly allocated to receive the CLiAC program (intervention) or usual care (control), stratified by type (residential vs. community, six each for each arm). Treatment allocation was masked to assessors and staff of all participating sites. The objective is to establish the effectiveness of the CLiAC program in improving work environment, workforce retention, as well as care safety and quality, when compared to usual care. The primary outcomes are measures of work environment, care quality and safety, and staff turnover rates. Secondary outcomes include manager leadership capacity, staff absenteeism, intention to leave, stress levels, and job satisfaction. Differences between intervention and control groups will be analysed by researchers blinded to treatment allocation using linear regression of individual results adjusted for stratification and clustering by site (primary analysis), and additionally for baseline values and potential confounders (secondary analysis). Outcomes measured at the site level will be

  19. Navigator program risk management

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Padilla, Deborah A.

    2004-01-01

    In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

  20. Programming for All Ages.

    ERIC Educational Resources Information Center

    Strobell, Adah Parker; And Others

    1985-01-01

    A changing society has resulted in different recreational needs for infants to senior citizens. Programs for pre-school children, six-to-twelve-year olds, teens, adults, and senior adults are suggested. Title of activities include Urban Picnic, Hot Dog Ski Clinics, and Romancing the Song. (MT)

  1. Cooperative disease management programs.

    PubMed

    Jedrey, C M; Chaurette, K A; Winn, L B

    2001-01-01

    Cooperative disease management programs sponsored by pharmaceutical companies and managed care organizations or health care providers can offer significant benefits to patients. They can be structured so as to comply with applicable OIG, FDA, and IRS regulations. Such programs must be structured for the benefit of patients, and not to require the use of or otherwise directly promote the selection of the sponsoring pharmaceutical company's products.

  2. Program Management Tool

    NASA Technical Reports Server (NTRS)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  3. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  4. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  5. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  6. Intermediate outcomes of chronic disease self-management program offered by members of the Healthy Aging Regional Collaborative in South Florida.

    PubMed

    Melchior, Michael A; Seff, Laura R; Albatineh, Ahmed N; McCoy, H Virginia; Page, Timothy F; Palmer, Richard C

    2014-07-01

    Currently, 80% of adults over the age of 65 have at least one chronic disease. The Chronic Disease Self-management Program (CDSMP) focuses on increasing self-efficacy for managing chronic disease. Few studies have evaluated the effectiveness of CDSMP when offered by multiple agencies, as a collaborative effort, in community-based settings. Seven agencies delivered 108 CDSMP workshops at 81 sites from October 1, 2008, to December 31, 2010. A total of 811 participants were eligible for analysis. Participants completed surveys at baseline and week 6, the end of instruction. Controlling for agency effect and general health at baseline, the general linear model was used to assess the significance of outcomes at 6 weeks. Outcomes showing significant improvement included self-efficacy to manage disease (p = .001), self-efficacy to manage emotions (p = .026), time spent walking (p = .008), and perceived social/role activities limitations (p = .001). Findings showed that CDSMP is an effective program at improving self-efficacy, increasing physical activity, and decreasing limitations.

  7. Quality Management Program

    SciTech Connect

    Not Available

    1991-10-01

    According to {section} 35.32, Quality Management Program,'' of 10 CFR Part 35, Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010.

  8. Geography Undergraduate Program Management

    ERIC Educational Resources Information Center

    Estaville, Lawrence E.; Brown, Brock J.; Caldwell, Sally

    2006-01-01

    Vision and mission statements are the foundation for the types of undergraduate degrees departments confer as well as other types of academic programs such as pre-major, certificate, and distance education curricula. Critical to each department should be careful administration of course selections and offerings and management of academic majors,…

  9. Programmed cell death in aging.

    PubMed

    Tower, John

    2015-09-01

    Programmed cell death (PCD) pathways, including apoptosis and regulated necrosis, are required for normal cell turnover and tissue homeostasis. Mis-regulation of PCD is increasingly implicated in aging and aging-related disease. During aging the cell turnover rate declines for several highly-mitotic tissues. Aging-associated disruptions in systemic and inter-cell signaling combined with cell-autonomous damage and mitochondrial malfunction result in increased PCD in some cell types, and decreased PCD in other cell types. Increased PCD during aging is implicated in immune system decline, skeletal muscle wasting (sarcopenia), loss of cells in the heart, and neurodegenerative disease. In contrast, cancer cells and senescent cells are resistant to PCD, enabling them to increase in abundance during aging. PCD pathways limit life span in fungi, but whether PCD pathways normally limit adult metazoan life span is not yet clear. PCD is regulated by a balance of negative and positive factors, including the mitochondria, which are particularly subject to aging-associated malfunction.

  10. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  11. Waste management program

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant are reported. Process and equipment development studies are considered as well as surveillance and maintenance, waste concentration, low level effluent waste, waste tank evaluation, and tank replacement/waste transfer (formerly waste tank retirement). Criteria for the selection of sites for storage of waste forms produced in the Defense Waste Processing Facility are described.

  12. Integrated Financial Management Program

    NASA Technical Reports Server (NTRS)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  13. Aging management guideline for commercial nuclear power plants - heat exchangers

    SciTech Connect

    Booker, S.; Lehnert, D.; Daavettila, N.; Palop, E.

    1994-06-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in commercial nuclear power plant heat exchangers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  14. Disease management programs.

    PubMed

    Armstrong, E P; Langley, P C

    1996-01-01

    Disease management (DM) activities are described, and their implementation and monitoring in managed care organizations are discussed. DM programs involve systematic evaluation of the relationships between treatment options and the associated resource use and patient outcomes for the purpose of providing a given standard of health care at the lowest possible resource cost. A DM arrangement covers a specified disease or therapy intervention for a patient group that may be defined by diagnosis, drug use, prior resource use, or patient characteristics. Often, the partners in a DM arrangement are a managed care organization and a pharmaceutical industry representative or division. The development and monitoring of disease management arrangements are dependent on access to several types of data, and these data are available in managed care plans. A DM arrangement includes interventions to change prescribing patterns or patient compliance and assessment of the effects of these interventions against target outcomes specified in the contract. The agreement that is developed specifies guidelines for treatment and requirements for data collection, monitoring, and reporting that are consistent with the target outcomes. In many DM arrangements, the partners share cost savings and risk; other arrangements involve case management on a capitated basis. A pharmaceutical company involved in risk sharing must change its focus from market share to optimal use of drugs within the total cost of treatment. If a risk-sharing contract covers an entire therapeutic class of drugs, a pharmaceutical company may share risk for the use of other manufacturers' products as well as its own. Disease management contracts must consider the full impact of each treatment option on the health system; the goal should be not simply to decrease the drug budget, but to decrease overall costs for treatment that achieves desired outcomes for specific diseases.

  15. Program audit, A management tool

    NASA Technical Reports Server (NTRS)

    Miller, T. J.

    1971-01-01

    Program gives in-depth view of organizational performance at all levels of the management structure, and provides means by which managers can effectively and efficiently evaluate adequacy of management direction, policies, and procedures.

  16. On the programmed/non-programmed aging controversy.

    PubMed

    Goldsmith, T C

    2012-07-01

    The programmed vs. non-programmed aging controversy has now existed in some form for at least 150 years. For much of the XX century, it was almost universally believed that evolution theory prohibited programmed (adaptive) aging in mammals and there was little direct experimental or observational evidence favoring it. More recently, multiple new evolutionary mechanics concepts that support programmed aging and steadily increasing direct evidence favoring it overwhelmingly support the existence of programmed aging in humans and other organisms. This issue is important because the different theories suggest very different mechanisms for the aging process that in turn suggest very different paths toward treating and preventing age-related diseases.

  17. Farm and Family Management Program.

    ERIC Educational Resources Information Center

    Iowa State Univ. of Science and Technology, Ames. Cooperative Extension Service.

    This teacher's guide contains four units for the farm and family management program, a three-year educational program through which farm families have the opportunity to participate in group and individualized instruction. The program is intended to help provide basic farm and home management information to farm families to meet the changes of the…

  18. Development of the ageing management database of PUSPATI TRIGA reactor

    SciTech Connect

    Ramli, Nurhayati Tom, Phongsakorn Prak; Husain, Nurfazila; Farid, Mohd Fairus Abd; Ramli, Shaharum; Maskin, Mazleha; Adnan, Amirul Syazwan; Abidin, Nurul Husna Zainal

    2016-01-22

    Since its first criticality in 1982, PUSPATI TRIGA Reactor (RTP) has been operated for more than 30 years. As RTP become older, ageing problems have been seen to be the prominent issues. In addressing the ageing issues, an Ageing Management (AgeM) database for managing related ageing matters was systematically developed. This paper presents the development of AgeM database taking into account all RTP major Systems, Structures and Components (SSCs) and ageing mechanism of these SSCs through the system surveillance program.

  19. Influences on Case-Managed Community Aged Care Practice.

    PubMed

    You, Emily Chuanmei; Dunt, David; Doyle, Colleen

    2016-10-01

    Case management has been widely implemented in the community aged care setting. In this study, we aimed to explore influences on case-managed community aged care practice from the perspectives of community aged care case managers. We conducted 33 semistructured interviews with 47 participants. We drew these participants from a list of all case managers working in aged care organizations that provided publicly funded case management program(s)/packages in Victoria, Australia. We used a multilevel framework that included such broad categories of factors as structural, organizational, case manager, client, and practice factors to guide the data analysis. Through thematic analysis, we found that policy change, organizational culture and policies, case managers' professional backgrounds, clients with culturally and linguistically diverse backgrounds, and case management models stood out as key influences on case managers' practice. In the future, researchers can use the multilevel framework to undertake implementation research in similar health contexts.

  20. MANAGING THE INSTRUCTIONAL PROGRAMMING EFFORT.

    ERIC Educational Resources Information Center

    RUMMLER, GEARY A.; AND OTHERS

    THE COMPENDIUM OF CASE HISTORIES ON THE DEVELOPMENT OF PROGRAMED INSTRUCTIONAL MATERIALS DESCRIBES ATTEMPTS BY GRADUATES OF A PROGRAMING WORKSHOP TO SOLVE MANAGEMENT DEVELOPMENT PROBLEMS IN THEIR OWN ORGANIZATIONS. AREAS OF DISCUSSION ARE--BEHAVIORAL TECHNOLOGY AND MANPOWER DEVELOPMENT, THE PROGRAMING PROCESS, CONTRACT (CUSTOM-MADE) PROGRAMS,…

  1. Cybersecurity Challenges for Program Managers

    DTIC Science & Technology

    2014-10-01

    41 Defense AT&L: September–October 2014 Cybersecurity Challenges for Program Managers Steve Mills n Rob Goldsmith Mills is a former program...University. Goldsmith is a systems engineer and currently the Aviation and Missile Research, Development and Engineering Center Cybersecurity Lead at...Redstone Arsenal, Ala. Cybersecurity threats to Department of De-fense (DoD) acquisi-tion programs are both challenging and com- plex. Program managers (PMs

  2. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  3. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  4. Plant maintenance and aging management: Are they the same?

    SciTech Connect

    Lofaro, R.J.

    1995-06-01

    As part of the NRC`s Nuclear Plant Aging Research Program, a number of aging studies were performed on safety-related systems and components which found that, even with current maintenance and monitoring practices in place, a large number of the reported failures are related to aging. This suggests that current practices are not sufficient to completely manage aging degradation, and other factors need to be considered. This paper examines the aging management process and the degree to which maintenance plays a part in it. Component failures and degradation mechanisms identified in aging studies of several different safety systems are summarized and evaluated, then con-elated with the components most frequently failed. This information, along with an analysis of failure causes, is then used to determine the extent to which aging is managed by current maintenance practices. Conclusions and recommendations for proper aging management arc also presented.

  5. Volunteer Management Support Program Handbook.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    This handbook is intended to serve as a guide for governing the operation and management of the Volunteer Management Support Program (VMSP). Outlined in the section on program guidelines are the structure and operations of the VMSP. The remainder of the guide, which deals with volunteer guidelines, explains VMSP volunteer responsibilities,…

  6. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    SciTech Connect

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  7. Preparing the Workforce for Healthy Aging Programs: The Skills for Healthy Aging Resources and Programs (SHARP) Model

    ERIC Educational Resources Information Center

    Frank, Janet C.; Altpeter, Mary; Damron-Rodriguez, JoAnn; Driggers, Joann; Lachenmayr, Susan; Manning, Colleen; Martinez, Dana M.; Price, Rachel M.; Robinson, Patricia

    2014-01-01

    Current public health and aging service agency personnel have little training in gerontology, and virtually no training in evidence-based health promotion and disease management programs for older adults. These programs are rapidly becoming the future of our community-based long-term care support system. The purpose of this project was to develop…

  8. Communicating Risk to Program Managers

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  9. Tribal Aging Programs: A Basic Guide.

    ERIC Educational Resources Information Center

    National Indian Council on Aging, Albuquerque, NM.

    A national training session for administrators of tribal aging programs held by the National Indian Council on Aging in November 1979 was the basis for the training manual. The seven chapter titles reflect workshop topics with the text of each chapter incorporating material presented in the workshops and examples of model programs on reservations.…

  10. Wildlife Management Assistance Program

    SciTech Connect

    Caudell, M.B.

    1992-08-01

    This report details activities in administering Savannah River Site public lands for wildlife management. Accomplishments in administering hunts, gathering biological data, and in coordinating land use are described.

  11. Environmental Management Science Program Workshop

    SciTech Connect

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  12. Evaluation of NRC maintenance team inspection reports for managing aging

    SciTech Connect

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC (Nuclear Regulatory Commission) has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab.

  13. Custodial Management in the Information Age.

    ERIC Educational Resources Information Center

    Harris, Jim, Sr.

    1999-01-01

    Explains how computerizing the custodial department can be achieved through bar coding, hand-held readers, and the appropriate software packages. Software programs that aid cleaning management, track assets, and manage stock are discussed. (GR)

  14. Effective recordkeeping technologies to manage aging

    SciTech Connect

    Dukelow, J.S.; Johnson, A.B. Jr. ); Vora, J.P. )

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms.

  15. Effective recordkeeping technologies to manage aging

    SciTech Connect

    Dukelow, J.S.; Johnson, A.B. Jr.; Vora, J.P.

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission`s Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms.

  16. Aging management guideline for commercial nuclear power plants-pumps

    SciTech Connect

    Booker, S.; Katz, D.; Daavettila, N.; Lehnert, D.

    1994-03-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant pumps important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  17. Active Aging Promotion: Results from the Vital Aging Program

    PubMed Central

    Caprara, Mariagiovanna; Molina, María Ángeles; Schettini, Rocío; Santacreu, Marta; Orosa, Teresa; Mendoza-Núñez, Víctor Manuel; Rojas, Macarena; Fernández-Ballesteros, Rocío

    2013-01-01

    Active aging is one of the terms in the semantic network of aging well, together with others such as successful, productive, competent aging. All allude to the new paradigm in gerontology, whereby aging is considered from a positive perspective. Most authors in the field agree active aging is a multidimensional concept, embracing health, physical and cognitive fitness, positive affect and control, social relationships and engagement. This paper describes Vital Aging, an individual active aging promotion program implemented through three modalities: Life, Multimedia, and e-Learning. The program was developed on the basis of extensive evidence about individual determinants of active aging. The different versions of Vital Aging are described, and four evaluation studies (both formative and summative) are reported. Formative evaluation reflected participants' satisfaction and expected changes; summative evaluations yielded some quite encouraging results using quasi-experimental designs: those who took part in the programs increased their physical exercise, significantly improved their diet, reported better memory, had better emotional balance, and enjoyed more cultural, intellectual, affective, and social activities than they did before the course, thus increasing their social relationships. These results are discussed in the context of the common literature within the field and, also, taking into account the limitations of the evaluations accomplished. PMID:23476644

  18. Preparing the workforce for healthy aging programs: the Skills for Healthy Aging Resources and Programs (SHARP) model.

    PubMed

    Frank, Janet C; Altpeter, Mary; Damron-Rodriguez, JoAnn; Driggers, Joann; Lachenmayr, Susan; Manning, Colleen; Martinez, Dana M; Price, Rachel M; Robinson, Patricia

    2014-10-01

    Current public health and aging service agency personnel have little training in gerontology, and virtually no training in evidence-based health promotion and disease management programs for older adults. These programs are rapidly becoming the future of our community-based long-term care support system. The purpose of this project was to develop and test a model community college career technical education program, Skills for Healthy Aging Resources and Programs (SHARP), for undergraduate college students, current personnel in aging service and community organizations, and others interested in retraining. A multidisciplinary cross-sector team from disciplines of public health, sociology, gerontology and nursing developed four competency-based courses that focus on healthy aging, behavior change strategies, program management, an internship, and an option for leader training in the Chronic Disease Self-Management Program. To enhance implementation and fidelity, intensive faculty development training was provided to all instructors and community agency partners. Baseline and postprogram evaluation of competencies for faculty and students was conducted. Process evaluation for both groups focused on satisfaction with the curricula and suggestions for program improvement. SHARP has been piloted five times at two community colleges. Trainees (n = 113) were primarily community college students (n = 108) and current aging service personnel (n = 5). Statistically significant improvements in all competencies were found for both faculty and students. Process evaluation outcomes identified the needed logical and component adaptations to enhance the feasibility of program implementation, dissemination, and student satisfaction. The SHARP program provides a well-tested, evidence-based effective model for addressing workforce preparation in support of healthy aging service program expansion and delivery.

  19. Illinois' nonpoint source management program

    SciTech Connect

    Not Available

    1994-07-01

    The Illinois Nonpoint Source (NPS) Management Program (Program) describes the statewide authorities that give the Illinois Environmental Protection Agency (IEPA) responsibility to develop and implement this Program. It provides a brief summary of the results of the States' NPS assessment as reported in the Illinois Water Quality Report. Included are eleven sections correlated to NPS pollution sources, or to an area of water pollution protection initiatives. These sections outline goals and objectives to be implemented in Illinois to abate NPS pollution, when possible the sections include a descriptive narrative. Included in the Program, is the process or mechanism which Illinois uses to prioritize and fund future projects. Finally, this Program identifies the federal programs that the IEPA currently reviews for consistency with statewide goals and objectives. Revisions to the Program will be made in accordance with state and federal program changes and as needed.

  20. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  1. Aircrew team management program

    NASA Technical Reports Server (NTRS)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  2. NPS TINYSCOPE Program Management

    DTIC Science & Technology

    2010-09-01

    Complementary Metal Oxide Semiconductor CPT - Comprehensive Performance Test CRC - Cyclic Redundancy Check DME - Data Management Element DoD...by onboard sun sensors and star trackers. Attitude control would be performed by either reaction wheels or control moment gyroscopes. Imaging...greater than five centimeters in diameter in the low earth orbit environment. Kinetic impacts with debris objects could potentially be fatal to the

  3. Natural Resources Management Program

    DTIC Science & Technology

    1989-01-24

    Program, activity, or opportunity dependent on the natural environment. Examples are hunting, fishing, trapping, picnick- ing, birdwatching , off-road...fair market value. d. Planned forest products sales shall continue on land reported as excess until actual disposal or transfer occurs. When forested

  4. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  5. Ethics in Program Management

    DTIC Science & Technology

    2007-03-01

    trading scandal , and a plethora of large corporate scandals involving companies like Enron , Tyco, and WorldCom. Troubling scandals have emerged...management Dr. Owen C. Gadeken The defense acquisition community, as well as society at large, seems to continually experience highly visible ethics scandals ...way they are led. It seems that every few years, the defense acquisition community is rocked by a highly visible ethics scandal . The latest involves Ms

  6. Hazardous Materials Management Program Report- 2005.

    SciTech Connect

    Brynildson, Mark E.

    2005-06-01

    The annual program report provides detailed information about all aspects of the SNL/CA Hazardous Materials Management Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  7. Aging Management using Proactive Management of Materials Degradation

    SciTech Connect

    Doctor, Steven R.; Bond, Leonard J.; Cumblidge, Stephen E.; Bruemmer, Stephen M.; Taylor, W Boyd; Carpenter, C. E.; Hull, Amy B.; Malik, Shah

    2010-10-01

    The U.S. Nuclear Regulatory Commission (NRC) has undertaken a program to lay the technical foundations for defining proactive actions to manage degradation of materials in light water reactors (LWRs). The current focus is existing plants; however, if applied to new construction, there is potential to better monitor and manage plants throughout their life cycle. This paper discusses the NRC’s Proactive Management of Materials Degradation (PMMD) program and its application to nuclear power plant structures, systems, and components (SSC).

  8. AGING MANAGEMENT USING PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION

    SciTech Connect

    Doctor, S. R.; Bond, L. J.; Cumblidge, S. E.; Bruemmer, S. M.; Taylor, W. B.; Carpenter, C. E.; Hull, A. B.; Malik, S. N.

    2010-02-22

    The U.S. Nuclear Regulatory Commission (NRC) has undertaken a program to lay the technical foundations for defining proactive actions to manage degradation of materials in light water reactors. The current focus is existing plants; however, if applied to new construction, there is potential to better monitor and manage plants throughout their life cycle. This paper discusses the NRC's Proactive Management of Materials Degradation program and its application to nuclear power plant structures, systems, and components.

  9. Aging Management Using Proactive Management of Materials Degradation

    NASA Astrophysics Data System (ADS)

    Doctor, S. R.; Bond, L. J.; Cumblidge, S. E.; Bruemmer, S. M.; Taylor, W. B.; Carpenter, C. E.; Hull, A. B.; Malik, S. N.

    2010-02-01

    The U.S. Nuclear Regulatory Commission (NRC) has undertaken a program to lay the technical foundations for defining proactive actions to manage degradation of materials in light water reactors. The current focus is existing plants; however, if applied to new construction, there is potential to better monitor and manage plants throughout their life cycle. This paper discusses the NRC's Proactive Management of Materials Degradation program and its application to nuclear power plant structures, systems, and components.

  10. Indoor Air Quality Management Program.

    ERIC Educational Resources Information Center

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  11. Sport Management Graduate Programs: Characteristics of Effectiveness.

    ERIC Educational Resources Information Center

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  12. Developing an Information and Records Management Program.

    ERIC Educational Resources Information Center

    Rutledge, Juli G.; Kartis, Alexia M.

    1984-01-01

    The need for information controls for college records management programs and the elements of program organization, planning, and management are discussed. Conditions at institutions that indicate a flaw in information control are identified, along with the benefits of a sound records management program. The management of an information and…

  13. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  14. Risk Management Programs for Defense Acquisition Systems

    DTIC Science & Technology

    2007-11-02

    The audit objective was to evaluate the effectiveness of risk management programs for Defense acquisition systems. Specifically, we determined whether DoD risk management policies and procedures for Defense acquisition systems were effectively implemented and what impact risk management programs bad on reducing program risks and costs. We also reviewed management controls as they applied to the audit objectives.

  15. Structural aging program -- a summary of activities, results, and conclusions

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.R.

    1997-01-01

    Research has been conducted by the Oak Ridge National Laboratory to address aging management of nuclear power plant concrete structures. The purpose was to identify potential structural safety issues and acceptance criteria for use in continued service assessments. Primary program accomplishments have included formulation of a Structural Materials Information Center that contains data and information on the time variation of material properties under the influence of pertinent environmental stressors and aging factors for 144 materials, an aging assessment methodology to identify critical structures and degradation factors that can potentially impact their performance, guidelines and evaluation criteria for use in condition assessments of reinforced concrete structures, and a reliability-based methodology for current condition assessments and estimations of future performance of reinforced concrete nuclear power plant structures. In addition, the Structural Aging Program conducted in-depth evaluations of several nondestructive evaluation and repair-related technologies to develop guidance on their applicability.

  16. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  17. Home audit program: management manual

    SciTech Connect

    Not Available

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  18. DoD Pest Management Program

    DTIC Science & Technology

    1983-10-24

    Pest Management Program,’ to revise policy and procedures for the...DoD Pest Management Program; authorizes the publication of DoD 4150.7-R, ’DoD Pest Management Program,’ and DoD 4150.7-M, ’Plan for Certification of...DoD directive 5025.1, ’Department of Defense Directives System,’ and cancels reference (c) Defense Environmental Quality Program Policy Memorandum (DEQPPM) 80-10, ’Department of Defense Pest Management

  19. Environmental Restoration Program Management Control Plan

    SciTech Connect

    Not Available

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

  20. 76 FR 11847 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  1. Managing Requirements for Acquisition Program Affordability

    DTIC Science & Technology

    2012-04-14

    to buy weapon systems at a lower cost and higher quality by leveraging commercial technology. He also directed program managers (PMs) and... Managing Requirements for Acquisition Program Affordability by Colonel James O. Winbush, Jr. United States Army...2011 to 11-04-2012 4. TITLE AND SUBTITLE Managing Requirements for Acquisition Program Affordability 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c

  2. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  3. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  4. 75 FR 29811 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  5. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  6. 76 FR 34124 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  7. 76 FR 58077 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  8. 76 FR 27743 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  9. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  10. 75 FR 52590 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  11. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  12. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  13. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  14. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  15. SEECAL: Program to calculate age-dependent

    SciTech Connect

    Cristy, M.; Eckerman, K.F.

    1993-12-01

    This report describes the computer program SEECAL, which calculates specific effective energies (SEE) to specified target regions for ages newborn, 1 y, 5 y, 10 y, 15 y, a 70-kg adult male, and a 58-kg adult female. The dosimetric methodology is that of the International Commission on Radiological Protection (ICRP) and is generally consistent with the schema of the Medical Internal Radiation Dose committee of the US Society of Nuclear Medicine. Computation of SEEs is necessary in the computation of equivalent dose rate in a target region, for occupational or public exposure to radionuclides taken into the body. Program SEECAL replaces the program SEE that was previously used by the Dosimetry Research Group at Oak Ridge National Laboratory. The program SEE was used in the dosimetric calculations for occupational exposures for ICRP Publication 30 and is limited to adults. SEECAL was used to generate age-dependent SEEs for ICRP Publication 56, Part 1. SEECAL is also incorporated into DCAL, a radiation dose and risk calculational system being developed for the Environmental Protection Agency. Electronic copies of the program and data files and this report are available from the Radiation Shielding Information Center at Oak Ridge National Laboratory.

  16. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR WATER-RESOURCES RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402... these programs. (c) Contracts. Administrative requirements for performance of research contracts will...

  17. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR WATER-RESOURCES RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402... these programs. (c) Contracts. Administrative requirements for performance of research contracts will...

  18. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR WATER-RESOURCES RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402... these programs. (c) Contracts. Administrative requirements for performance of research contracts will...

  19. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR WATER-RESOURCES RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402... these programs. (c) Contracts. Administrative requirements for performance of research contracts will...

  20. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR WATER-RESOURCES RESEARCH PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402... these programs. (c) Contracts. Administrative requirements for performance of research contracts will...

  1. Minority Participation in Administration on Aging Programs

    DTIC Science & Technology

    1991-03-15

    testimony today, we will present information on (1) the methodology AoA uses to collect data on minority participation and (2) data collection methods ...GeneralD Program Evaluation and Ak’-’iIbiity o0,;es Methodology Division Before the Dist Avpibor Subcommittee on Aging I Senate Committee on Labor .11...reasons. First, changes in states’ reporting methods and in AoA requirements made it impossible to compare data collected before 1981 with that

  2. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  3. Solid Waste Management Program Plan

    SciTech Connect

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  4. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  5. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2002-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education.

  6. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  7. 76 FR 39857 - Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... National Oceanic Atmospheric Administration Alaska Coastal Management Program Withdrawal From the National... Coastal Resource Management (OCRM), National Ocean Service (NOS), National Oceanic Atmospheric... withdrawal from participation in the CZMA's National Coastal Management Program. The CZMA Federal...

  8. Outcomes Assessment in Accredited Health Information Management Programs

    ERIC Educational Resources Information Center

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  9. Schedule Management Competencies for Department of Defense Program Managers.

    DTIC Science & Technology

    1995-09-01

    professionalism of their procurement workforce. Models identifying the competencies required of DoD program managers could provide valuable information for ...considered "valuable" to practicing program managers. A complete list of the medians and percentages can be found in Appendix E . Research Question 2... method for providing the standard skills necessary to manage programs. Education and training programs are therefore essential to ensure professionals

  10. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  11. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  12. 14 CFR 91.1017 - Amending program manager's management specifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Amending program manager's management... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional... specifications will set a reasonable period (but not less than 7 days) within which the program manager...

  13. School-Age Ideas and Activities for After School Programs.

    ERIC Educational Resources Information Center

    Haas-Foletta, Karen; Cogley, Michele

    This guide describes activities for school-age children in after-school day care programs. These activities may also be used in other settings. An introductory section discusses program philosophy, room arrangement, multicultural curriculum, program scheduling, summer programs and holiday care, field trips and special programs, age grouping,…

  14. Evaluating and Selecting Sport Management Undergraduate Programs.

    ERIC Educational Resources Information Center

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  15. Program Management Collection. "LINCS" Resource Collection News

    ERIC Educational Resources Information Center

    Literacy Information and Communication System, 2011

    2011-01-01

    This edition of "'LINCS' Resource Collection News" features the Program Management Collection, which covers the topics of Assessment, Learning Disabilities, and Program Improvement. Each month Collections News features one of the three "LINCS" (Literacy Information and Communication System) Resource Collections--Basic Skills, Program Management,…

  16. Behavior management for preschool-aged children.

    PubMed

    Williford, Amanda P; Shelton, Terri L

    2014-10-01

    This article summarizes behavior management strategies for preschool children who are at high risk for attention-deficit/hyperactivity disorder that have found to be effective in improving child behavior. Both parent and teacher training programs are reviewed, as these have been backed by substantial research evidence. In addition, multimodal treatments that include some combination of parent training, teacher training, and social skills training are also reviewed. Interventions emphasize the need for a strong adult-child relationship combined with proactive behavior management strategies to improve child behavior.

  17. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  18. Adaptive Management Implementation: Glen Canyon Dam Adaptive Management Program Trinity River Restoration Program

    USGS Publications Warehouse

    Wittler, R.; McBain, S.; Stalnaker, C.; Bizier, P.; DeBarry, P.

    2003-01-01

    Two adaptive management programs, the Glen Canyon Dam Adaptive Management Program (GCDAMP) and the Trinity River Restoration Program (TRRP) are examined. In both cases, the focus is on managing the aquatic and riparian systems downstream of a large dam and water supply project. The status of the two programs, lessons learned by the program managers and the Adaptive Environmental Assessment and Management (AEAM) evolution of the TRRP are discussed. The Trinity River illustrates some of the scientific uncertainities that a program faces and the ways the program evolves from concept through implementation.

  19. Material Management Program Can Attract Local Industry

    ERIC Educational Resources Information Center

    Magad, Eugene L.

    1978-01-01

    Describes the material management certificate and the associate in applied science degree programs at William Rainey Harper College, Palatine, Illinois. Material management functions include purchasing, production control, inventory control, material handling, warehousing, packaging, computer applications, and transportation. (MF)

  20. Cost Management Competencies for Department of Defense Program Managers

    DTIC Science & Technology

    1994-09-01

    Posner .................................................................................................... 22 Cadbury -Schweppes...Posner’s Problems and Skills .............................................................................. . 23 8. Cadbury -Schweppes Model...goals make organizational skills critical. Cadbury -Schweppes Cadbury -Schweppes conducted an extensive research program involving program manager

  1. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  2. Managing transitional work--program foundation.

    PubMed

    Strasser, Patricia B

    2004-08-01

    A comprehensive TWP is a critical element in any disability management effort. The program must be developed just as any successful worksite program is: with management support, teamwork, a coordinator, written policies and procedures, effective marketing, and communications. In addition, the program must be evaluated and continuously improved. A successful program will contribute to the location's bottom line as well as improve the health of employees.

  3. The Air Program Information Management System (APIMS)

    DTIC Science & Technology

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  4. Guide for Managers of Adult Education Programs.

    ERIC Educational Resources Information Center

    Hudson River Center for Program Development, Glenmont, NY.

    This document is intended to help adult education program managers throughout New York become oriented to the world of adult education, handle their new responsibilities as program managers, and obtain up-to-date information to assist them in making educational and administrative decisions. The following are among the topics discussed in the…

  5. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  6. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  7. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  8. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  9. Bilingual Program Management: A Problem Solving Approach.

    ERIC Educational Resources Information Center

    De George, George P., Ed.

    A collection of essays on the management of bilingual education programs is organized in three units: managing in a culturally diverse setting, balancing critical interactions, and special issues. The following papers are included: "Recruiting and Retaining Competent Personnel for Bilingual Education Programs" (Joan E. Friedenberg, Curtis H.…

  10. Integrating Cybersecurity into the Program Management Organization

    DTIC Science & Technology

    2015-05-13

    All rights reserved. Outline  The Cybersecurity threat  Laws, regulations , policy, and guidance Cybersecurity and the Program Manager...cybersecurity risk-based management framework  Cybersecurity needs to be integrated into program acquisition and execution support to facilitate

  11. Program Evaluation: Two Management-Oriented Samples

    ERIC Educational Resources Information Center

    Alford, Kenneth Ray

    2010-01-01

    Two Management-Oriented Samples details two examples of the management-oriented approach to program evaluation. Kenneth Alford, a doctorate candidate at the University of the Cumberlands, details two separate program evaluations conducted in his school district and seeks to compare and contrast the two evaluations based upon the characteristics of…

  12. Hospital program weds case, disease management.

    PubMed

    1997-10-01

    To lower its readmission rates and inpatient length of stay for three high-volume chronic conditions, Memorial Hospital in Colorado Springs, CO, developed a program that combines clinical pathways with a cross-continuum disease management program. Community physicians refer patients to the program. Hospital-based care managers guide patients in the acute setting before handing them off to outpatient case managers, who coordinate the patient's transition to home care. Clinicians at Memorial sold administrators on the "care-case management" approach by arguing that increased inpatient efficiency would offset potential revenue shortfalls due to fewer admissions.

  13. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  14. Defense Acquisition University Program Managers Tool Kit

    DTIC Science & Technology

    2011-01-01

    International Standards Organization ( ISO ) registration of a supplier’s quality system since there have been instances where ISO 9001 -registered supplier...58 Quality Management Systems (Defense Acquisition Guidebook...facilities and equipment. DAU PROGRAM MANAGERS TOOL KIT 59 Quality Management Systems (see Defense Acquisition Guidebook) • The PM should allow

  15. Chapter 1 Information Management Program. User's Guide.

    ERIC Educational Resources Information Center

    RMC Research Corp., Denver, CO.

    The first of seven chapters in this guide for users of the Chapter 1 Information Management Program (CHIMP) provides an introduction to the program, which was designed to help school districts maintain data and produce reports used in the evaluation of Chapter 1 programs. It is noted that these reports are useful for meeting state and federal…

  16. The FAA aging airplane program plan for transport aircraft

    NASA Technical Reports Server (NTRS)

    Curtis, Dayton; Lewis, Jess

    1992-01-01

    The Federal Aviation Administration (FAA) Aging Airplane Program is focused on five program areas: maintenance, transport airplanes, commuter airplanes, airplane engines, and research. These programs are complementary and concurrent, and have been in effect since 1988. The programs address the aging airplane challenge through different methods, including policies, procedures, and hardware development. Each program is carefully monitored and its progress tracked to ensure that the needs of the FAA, the industry, and the flying public are being met.

  17. Read for Fun: Management Program.

    ERIC Educational Resources Information Center

    Miner, Donna

    Program materials and a brief description of a remedial reading program for grades 3-6 which uses contests to motivate reading at home are presented. The program uses bulletin board displays to keep track of student progress in the contests. The contests operate as follows: (1) students select a name for their figure on the bulletin board; (2)…

  18. Economic evaluation of an internet-based weight management program

    Technology Transfer Automated Retrieval System (TEKTRAN)

    To determine whether a behavioral Internet treatment (BIT) program for weight management is a viable, cost-effective option compared with usual care (UC) in a diverse sample of overweight (average body mass index = 29 kg/m2), healthy adults (mean age = 34 years) serving in the US Air Force. Two-grou...

  19. Weight management for Mexican American adolescents: school-based program

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The objective of the current study was to assess change in weight over time for children participating in a school-based weight management program. A total of 47 participants between the ages of 10 and 14 who exceeded the 85th percentile for BMI were randomized into an intensive intervention (II) o...

  20. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  1. The Management Role In Optical Programs

    NASA Astrophysics Data System (ADS)

    Galat, Edmund J.

    1981-03-01

    Throughout the 1960's and 1970's, numerous optical system programs have been carried from conception to operational status. Industry responsibilities include definition of and resolution of critical technology problems, development of conceptual designs for operational and support hardware, and finally, development and production of the operational hardware. This paper will discuss the role and the contributions of the management team in the evolution of three typical high technology optical programs. The first case study to be discussed is the role of management in a high-risk/high-payoff technology program, exemplified by the DARPA High Altitude Large Optics (HALO) Program. The second case study is based on Itek's involvement in the definition phases of the Space Tele-scope Program. The last case to be examined is the role of management in a major optical program directed at producing operational hardware in a timely, cost-effective manner.

  2. The NBS data management technology program

    NASA Technical Reports Server (NTRS)

    Wood, H. M.

    1984-01-01

    The National Bureau of Standards (NBS) Data Management Technology Program is discussed. The NBS Data Management Technology Program addresses major problems encountered during the following stages of an application's lifetime: requirements analysis and data base design, system selection and implementation, operations management and conversion. Products developed include standard software specifications, guides to best practice, standard data elements and representations, and reports documenting the experiences of other organizations as they attempt to improve the management of their computing resources. Data base Laboratory facilities are maintained for the investigation and analysis of state of the art data base technology. These facilities support collaborative testing with researchers, vendors, users, and standards developers.

  3. Interdisciplinary Programs Focused Populations: The Case of Health Management Program

    ERIC Educational Resources Information Center

    Davidovitch, Nitza; Yavich, Roman

    2015-01-01

    The Ariel University has a unique interdisciplinary program in healthcare management that targets experienced healthcare professionals who wish to earn an academic degree. Only one academic study has been held so far on the integration of graduates of an academic university-level school in healthcare management in the field. In the current study,…

  4. Marketing Education Program Management Guide.

    ERIC Educational Resources Information Center

    Blair, Betty; And Others

    This guide was designed for use by marketing education teacher-coordinators and administrators in implementing marketing education programs. The document includes the following: an overall picture of administrative responsibilities related to high quality programs, guidelines and forms needed to deliver effective instruction, resources and…

  5. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  6. School-Age Child Care: Innovative Public School Programs.

    ERIC Educational Resources Information Center

    ERS Spectrum, 1992

    1992-01-01

    Innovative school-age day care programs include Tennessee's Extended School Program; Hawaii's After-School Plus program; San Antonio's Kid's Involvement Network (offering middle school supervision); Aurora, Colorado's state-licensed Year-Round School Recreation Plan; and Pomona, California's Child Development Program. These public school programs…

  7. Economic value evaluation in disease management programs.

    PubMed

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  8. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  9. Data warehousing in disease management programs.

    PubMed

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  10. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  11. The aging network and managed long-term care.

    PubMed

    Polivka, Larry; Zayac, Helen

    2008-10-01

    Since the early 1980s, service providers and area agencies on aging, that is, the aging network, have developed a number of strengths as they built a community-based long-term-care system in most states. Many area agencies and providers now have the capacity to assess the needs of older persons, identify appropriate services, and administer cost-effective community programs while operating within fixed, capped budgets. They have also been able to identify and maintain roles for informal caregivers, draw on community resources through donations and the use of volunteers, and create substantial political support. In this article we argue that the aging network should draw on these strengths to develop integrated long-term-care systems designed to shift the balance of state long-term-care systems from institutional to home- and community-based services. We also argue that the nonprofit aging network, because it is made up of area agencies on aging and service providers, provides a potentially more effective framework for the integration of long-term-care resources than do proprietary managed care organizations.

  12. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  13. Cryogenic fluid management program flight concept definition

    NASA Technical Reports Server (NTRS)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  14. UNBC: Outdoor Recreation and Tourism Management Program

    ERIC Educational Resources Information Center

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  15. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1993-01-01

    This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  16. Management Information System for ESD Program Offices.

    DTIC Science & Technology

    1978-03-01

    Management Information System (MIS) functional requirements for the ESD Program Office are defined in terms of the Computer-Aided Design and Specification Tool. The development of the computer data base and a description of the MIS structure is included in the report. This report addresses management areas such as cost/budgeting, scheduling, tracking capabilities, and ECP

  17. Fashion Production and Management Program Guide.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Div. of Vocational Education.

    This program guide presents the standard fashion production and management curriculum for technical institutes in Georgia. It is designed to relate primarily to the development of those skills needed to become a qualified alterationist, clothing design assistant, home textiles assistant, fashion management assistant, or tailoring assistant. A…

  18. Community Energy Management Programs for Commercial Building Owners and Managers.

    ERIC Educational Resources Information Center

    Chick, Walter S.

    1987-01-01

    A voluntary program in Ontario encourages the private sector to reduce its energy consumption in commercial buildings by experimenting with innovative building operation techniques. Charts and tables illustrate the outstanding results achieved by program participants. Yearly energy management forums are convened in Toronto and Ottawa. (MLF)

  19. Computer-Aided Corrosion Program Management

    NASA Technical Reports Server (NTRS)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  20. A Self-Managed Reading Improvement Program.

    ERIC Educational Resources Information Center

    Ruppel, George

    In an investigation of the effectiveness of self-managed reading improvement programs, a program incorporating self-monitoring (observing and recording relevant activity), self-reinforcement (increasing the probability of some target behavior by the self-presentation of positive consequences or the removal of negative consequences), and shaping…

  1. Computerized, telephone-based stress management program.

    PubMed Central

    Schneider, S. J.; Schwartz, M. D.; Fast, J.

    1993-01-01

    A stress management program that used computerized, telephone-based technology was offered to the public via a free, "800" telephone number. The program was intended to reach a very large number of persons, while requiring a minimum of staff time. The program used an interactive telephone system, employing natural sounding, digitized voice, and touch tone recognition of callers' responses. The program was available 24 hours a day. It composed each message to suit the individual needs and expectations of each caller. A controlled evaluation of the program was conducted to determine how the messages could be worded and presented most effectively. The results suggest that subjects were most likely to find the messages in the program helpful, to carry out the stress management instructions, and to continue calling when the messages were personalized and contained homework assignments. PMID:8130497

  2. A Review of Information for Managing Aging in Nuclear Power Plants

    SciTech Connect

    WC Morgan; JV Livingston

    1995-09-01

    Age related degradation effects in safety related systems of nuclear power plants should be managed to prevent safety margins from eroding below the acceptable limits provided in plant design bases. The Nuclear Plant Aging Research (NPAR) Pro- gram, conducted under the auspices of the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research, and other related aging management programs are developing technical information on managing aging. The aging management process central to these efforts consists of three key elements: 1) selecting structures, systems, and components (SSCs) in which aging should be controlled; 2) understanding the mechanisms and rates of degradation in these SSCs; and 3) managing degradation through effective inspection, surveillance, condition monitoring, trending, record keeping, mainten- ance, refurbishment, replacement, and adjustments in the operating environment and service conditions. This document concisely reviews and integrates information developed under the NPAR Program and other aging management studies and other available information related to understanding and managing age-related degradation effects and provides specific refer- ences to more comprehensive information on the same subjects.

  3. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  4. Software Program: Software Management Guidebook

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

  5. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  6. The NASA Software Management and Assurance Program

    NASA Technical Reports Server (NTRS)

    Hall, D. L.; Wilson, W. M.

    1983-01-01

    A committee of experienced managers representing each major NASA organization guides a major development effort which seeks to ensure the acquisition of economical and reliable software for more complex future programs. The primary, near-term development objectives of the NASA Software Management and Assurance Program are: (1) to provide the best management and technical guidance available; (2) to facilitate the use of proven tools, techniques, and information; and (3) to maintain a pool of highly qualified software personnel. The software development tasks addressed involve such problems as satellite end-to-end architecture and advanced aircraft guidance and control systems.

  7. NASA management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Peters, F.

    1975-01-01

    The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

  8. Environmental Restoration Program Control Management System

    SciTech Connect

    Duke, R.T.

    1992-08-13

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system.

  9. 77 FR 55105 - Aging Airplane Program: Widespread Fatigue Damage; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Parts 121 and 129 RIN 2120-AI05 Aging Airplane Program: Widespread... entitled ``Aging Airplane Program: Widespread Fatigue Damage'' (77 FR 30877), which corrected a final...

  10. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    SciTech Connect

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  11. The Columbia University Management Program.

    ERIC Educational Resources Information Center

    Yavarkovsky, Jerome; Haas, Warren J.

    In 1971, a management consulting firm undertook a case study of the Columbia University libraries to improve library performance by reviewing and strengthening the organization and recasting staff composition and deployment patterns. To implement the study's recommendations, an administrative structure was proposed which would emphasize functional…

  12. Risk Management for Wilderness Programs.

    ERIC Educational Resources Information Center

    Schimelpfenig, Tod

    This paper discusses subjective hazards in wilderness activities and suggests means of assessing and managing related risks. Wilderness educators conveniently group hazards into objective and subjective ones. Objective hazards such as rockfall, moving water, and weather, while not necessarily predictable, are visible and understandable. Subjective…

  13. Managing Delinquency Programs That Work.

    ERIC Educational Resources Information Center

    Glick, Barry, Ed.; Goldstein, Arnold P., Ed.

    Sixteen chapters, written by leaders in the profession, focus on issues relevant to managing effective approaches to the problem of juvenile delinquency. Part 1, "Policy Formulation and Direction," includes: (1) "A National Perspective" (J. C. Howell); (2) "A State Perspective" (E. J. Loughran, S. Guarino-Ghezzi); (3)…

  14. A Natural Resources Management Program

    ERIC Educational Resources Information Center

    Lancaster, George B.

    1977-01-01

    Three years of instruction in natural resources management (NRM) are offered at Louisa County High School, Mineral, Virginia, with 30 acres of land for use as outdoor classrooms. Instructional areas are grouped under forestry; crops and soils; and surveying, air, water, recreation, and general. Two years of basic agriculture science and mechanics…

  15. Air Age Education. Aviation Career Awareness Program.

    ERIC Educational Resources Information Center

    Petrie, Edwin T.

    Described is a program designed to help introduce the broad scope of occupational careers available with general aviation. The program is designed to aid the teacher in presenting the basic principles of flight, essential facts about general aviation as well as its occupational opportunities. It replaces previous elementary student materials, and…

  16. Managing a Library Binding Program.

    ERIC Educational Resources Information Center

    Merrill-Oldham, Jan

    Library binding is one of the activities typically included in newly created preservation departments, but librarians continue to discover that transforming a traditional binding program into one that better meets preservation objectives requires considerable investment of time. This resource guide is intended to help libraries review their…

  17. Evolution of Aging Theories: Why Modern Programmed Aging Concepts Are Transforming Medical Research.

    PubMed

    Goldsmith, Theodore C

    2016-12-01

    Programmed aging refers to the idea that senescence in humans and other organisms is purposely caused by evolved biological mechanisms to obtain an evolutionary advantage. Until recently, programmed aging was considered theoretically impossible because of the mechanics of the evolution process, and medical research was based on the idea that aging was not programmed. Theorists struggled for more than a century in efforts to develop non-programmed theories that fit observations, without obtaining a consensus supporting any non-programmed theory. Empirical evidence of programmed lifespan limitations continued to accumulate. More recently, developments, especially in our understanding of biological inheritance, have exposed major issues and complexities regarding the process of evolution, some of which explicitly enable programmed aging of mammals. Consequently, science-based opposition to programmed aging has dramatically declined. This progression has major implications for medical research, because the theories suggest that very different biological mechanisms are ultimately responsible for highly age-related diseases that now represent most research efforts and health costs. Most particularly, programmed theories suggest that aging per se is a treatable condition and suggest a second path toward treating and preventing age-related diseases that can be exploited in addition to the traditional disease-specific approaches. The theories also make predictions regarding the nature of biological aging mechanisms and therefore suggest research directions. This article discusses developments of evolutionary mechanics, the consequent programmed aging theories, and logical inferences concerning biological aging mechanisms. It concludes that major medical research organizations cannot afford to ignore programmed aging concepts in assigning research resources and directions.

  18. Real estate management program implementation handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook provides a ready reference to pertinent policy and guidance for the management of real estate activities in NASA. Real property means buildings, structures, utility systems, and land, along with its permanently connected appurtenances and improvements. The Real Estate Management Program is designed to provide a uniform and orderly process for meeting NASA's programmatic and institutional real estate needs and other real estate management requirements. The purpose of this Real Estate Management Program Implementation Handbook (REMPIH) is to provide guidance and assistance to NASA officials in carrying out their responsibilities for the review, reporting, accounting, acquisition, and disposal of NASA controlled/occupied real estate in accordance with the applicable procedures of 14 CFR 1204.501, 1204.503, 1204.504, and Attachment A to NMI 8800.14. The REMPIH provides a concise, non-technical, and authoritative reference for the efficient management of NASA real estate.

  19. Hybrid Power Management Program Continued

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2002-01-01

    Hybrid Power Management (HPM) is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and photovoltaics. HPM has extremely wide potential with applications including power-generation, transportation, biotechnology, and space power systems. It may significantly alleviate global energy concerns, improve the environment, and stimulate the economy.

  20. Program Manager Assessments: Professionalism Personified

    DTIC Science & Technology

    2015-08-01

    PMs in an awkward position, where they might fear that being too honest with me could jeopardize their program or get them into trouble with a senior...Deming) is that one must drive fear out of an organization to achieve success. No fear is more crippling or dysfunctional to an organization than fear of...negative consequences of tell- ing the truth. Close behind that is fear that a new idea will be dismissed or ridiculed. I decided that any

  1. Aging Management Guideline for commercial nuclear power plants: Power and distribution transformers

    SciTech Connect

    Toman, G.; Gazdzinski, R.

    1994-05-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in power and distribution transformers important to license renewal in commercial nuclear power plants. The intent of this AMG to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner which allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  2. Aging management guideline for commercial nuclear power plants-stationary batteries. Final report

    SciTech Connect

    Berg, R.; Shao, J.; Krencicki, G.; Giachetti, R.

    1994-03-01

    The Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant stationary batteries important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  3. Aging Management Guideline for commercial nuclear power plants: Motor control centers; Final report

    SciTech Connect

    Toman, G.; Gazdzinski, R.; O`Hearn, E.

    1994-02-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) commercial nuclear power plant motor control centers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  4. Aging Management Guideline for commercial nuclear power plants: Electrical switchgear. Final report

    SciTech Connect

    Toman, G.; Gazdzinski, R.; Schuler, K.

    1993-07-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant electrical switchgear important to license renewal. The latent of this AMG to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner which allows personnel responsible for performance analysis and maintenance, to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  5. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  6. Evaluation of a Community-Based Aging Intervention Program

    ERIC Educational Resources Information Center

    Hsu, Hui-Chuan; Wang, Chun-Hou; Chen, Yi-Chun; Chang, Ming-Chen; Wang, Jean

    2010-01-01

    This study evaluated the outcome and process of a community-based aging intervention program for the elderly in Taiwan. The program included education on nutrition and dietary behavior and on physical activities. Outcome and process evaluations were conducted. The program may have had some effects on decreasing some dietary behavioral problems and…

  7. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program management systems. 632.76...

  8. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management systems. 632.76...

  9. Organization and management of space grant programs

    NASA Technical Reports Server (NTRS)

    Sheppard, Sallie; Nichols, Steve

    1990-01-01

    The 21 Space Grant Programs represent a broad range of organizational structures which operate programs ranging in size from single university organizations to organizations including up to 41 members involving a composite of industrial organizations such as state agencies, and universities. Some of the space grant awards were made to organizations already in existence with on-going programs while other awards were made to consortia newly formed for the purpose of applying to the Space Grant Program. The workshop on organization and management of Space Grant Programs provided an opportunity for directors and program representatives to discuss and compare the relative advantages and disadvantages of the various models being used. This paper offers examples of the diversity of organizations, summarizes the common concerns to be met by each organizational model, and provides a case study of the Texas Space Grant Consortium organization.

  10. Wicking teaching aged care facilities program: innovative practice.

    PubMed

    Robinson, Andrew; See, Catherine; Lea, Emma; Bramble, Marguerite; Andrews, Sharon; Marlow, Annette; Radford, Jan; McCall, Michael; Eccleston, Claire; Horner, Barbara; McInerney, Fran

    2015-09-08

    This paper reports on the design of a program that aims to prototype teaching aged care facilities in Australia. Beginning in two Tasmanian residential aged care facilities, the intent of the program is to support large-scale inter-professional student clinical placements, positively influence students' attitudes toward working in aged care and drive development of a high-performance culture capable of supporting evidence-based aged care practice. This is important in the context of aged care being perceived as an unattractive career choice for health professionals, reinforced by negative clinical placement experiences. The Teaching Aged Care Facilities Program features six stages configured around an action research/action learning method, with dementia being a key clinical focus.

  11. The Marshall Islands Data Management Program

    SciTech Connect

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  12. 77 FR 8219 - Coastal Zone Management Program: Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... National Oceanic and Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and Atmospheric Administration (NOAA), U... Federal Approval of the Illinois Coastal Management Program (ICMP). SUMMARY: NOAA's OCRM announces...

  13. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... Federal Highway Administration Multistate Corridor Operations and Management Program AGENCY: Federal... Operations and Management (MCOM) Program authorized by the Safe, Accountable, Flexible, Efficient... transportation challenges facing the efficient and effective operation and management of...

  14. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... Terrorism Risk Insurance Program; Litigation Management Submissions AGENCY: Departmental Offices. ACTION..., the Terrorism Risk Insurance Program Office is seeking comments regarding Litigation Management..., preferably an original and two copies) to: Terrorism Risk Insurance Program, Public Comment Record,...

  15. Chapter 5, "License Renewal and Aging Management for Continued Service

    SciTech Connect

    Naus, Dan J

    2013-01-01

    As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.

  16. Managing the aging man in Asia: a review.

    PubMed

    Tong, Seng Fah; Ho, Christopher; Tan, Hui Meng

    2011-01-01

    The aging man is becoming a major burden to Asian countries because of the current poor health status of Asian men and the aging Asian population. Life expectancy at birth for men is shorter than women by an average of 4 years in Asian countries and major causes of death are cardiovascular disease, cancers, injuries and infections. However, there are considerable variations between Asian countries because of great disparity in socioeconomic status. Male-specific disorders, such as male sexual health and urological conditions, are other major health burdens because they have a great impact on men's quality of life. More importantly, many risk factors to the causes of mortality and morbidities, such as high-risk behavior and smoking, can be improved with health promotion and early intervention. The current evidence suggests that the poor health status of men is the result of their poor health care utilization, negative health-seeking behavior, the adverse social environment for men and gender-insensitive health care delivery. However, much evidence is still needed as Asian countries have great diversity in culture, societal values and men's needs. Asian time-tested wisdom on a balanced healthy lifestyle to longevity should be explored as potential men's health promotional programs. Taking into account Asian men's health-care needs, a gender-streamlined approach and man-friendly health care delivery should be on the national agenda in managing the aging man.

  17. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  18. Sandia National Laboratories, California Waste Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  19. Physician use of disease management programs.

    PubMed

    Wholey, Douglas R; Michail, Nina; Christianson, Jon; Knutson, David

    2005-02-01

    This paper examines differences in availability, use, and perceived usefulness of disease management programs as reported by generalist and specialist physicians functioning as primary care providers in health plans. Implications of these differences are discussed in terms of the three types of purchasers: private insurers, Medicare, and Medicaid. The design is a cross-sectional mail and telephone mixed-mode survey. The data come from 23 health plans in five states (Florida, New York, Colorado, Pennsylvania, and Washington), including six metropolitan areas: Seattle, New York City, Miami, Pittsburgh, Philadelphia, and Denver. The study participants are 1,244 generalist and specialist physicians who contracted with health plans as primary care providers. They were drawn from a 2001 mail and telephone survey of 2,105 generalist and 1,693 specialist physicians serving commercial, Medicaid, and Medicare patients. Physician responses about use of disease management for their patients in the health plan and how useful they thought it was were regressed on physician, physician organization, and physician-health plan relationship characteristics. While generalist physicians are likely to report having disease management programs available and using them, specialists vary greatly in their response to the disease management programs. In contrast to physicians associated with commercial plans, implementation of disease management programs among physicians associated with Medicaid plans varied across states. Primary care providers trained in generalist areas of practice are more likely than specialists functioning as primary care providers to report that disease management programs are available and to use them. They also find them more useful than do specialists.

  20. Software Management for Weapon System Programs.

    DTIC Science & Technology

    1987-09-01

    Force, or the Department of Defense. 𔃾 Ir l ’ " r II " II ’ | ’ I AFIT/GSM/LSY/87S-24 SOFTWARE MANAGEMENT FOR WEAPON SYSTEM PROGRAMS THESIS Presented...distribution unlimited ) iL 4 t p , ~ nA l ’ FA I " ’ ’ 1 r a . . . r n w -:. v ; - , - ; r . -,, w,- :. .w -rn ’- S. - o . Preface This research was prompted...organization is responsible. The third program office. ASD/YWS, is also a small program office, " r . residing in the same organization as other small

  1. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    SciTech Connect

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified.

  2. Managing aging in nuclear power plants: Insights from NRC`s Maintenance Team Inspection reports

    SciTech Connect

    Fresco, A.; Subudhi, M.

    1992-12-31

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified.

  3. Seizure Management for School-Age Children

    ERIC Educational Resources Information Center

    Frueh, Eileen

    2008-01-01

    As many as 325,000 school-age children, ages 5-14, have epilepsy in the U.S. Thankfully, with medication, surgery, a special diet or vagus nerve stimulation, most go to school and fully participate in school activities. Children who continue to have seizures, however, may run into problems. Many of these problems can be overcome or prevented…

  4. AGING WATER INFRASTRUCTURE RESEARCH PROGRAM: ADDRESSING THE CHALLENGE THROUGH INNOVATION

    EPA Science Inventory

    A driving force behind the Sustainable Water Infrastructure (SI) initiative and the Aging Water Infrastructure (AWI) research program is the Clean Water and Drinking Water Infrastructure Gap Analysis. In this report, EPA estimated that if operation, maintenance, and capital inves...

  5. Toward a Distinctive Christian Undergraduate Management Program

    ERIC Educational Resources Information Center

    Smith, Thomas M.; VanderVeen, Steve

    2008-01-01

    We motivate and develop a theoretical framework for creating a distinctive Christian undergraduate management program that is directed toward providing (a) the necessary intellectual characteristics to do "well" and (b) the necessary emotional characteristics to do "good." This framework consists of seven propositions that connect the learning…

  6. Parents are Teachers: A Child Management Program.

    ERIC Educational Resources Information Center

    Becker, Wesley C.

    This manual is designed to help parents apply reinforcement theory in managing their children. The program explains how parents can systematically use consequences to teach children in positive ways. Units include: When to Reinforce; How to Reinforce; Reinforcement and Punishment in Everyday Life; and Why Parents (and Teachers) Goof; the Criticism…

  7. Vocational-Technical Education Program Management Guide.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Education, Des Moines. Div. of Community Colleges.

    This program management guide, which contains information specific to Iowa's educational system and standards, is designed to assist vocational administrators in their activities with regard to the following: the vision, mission, philosophy of vocational education (VE); occupational competencies; competency-based VE; articulation; advisory…

  8. Choosing the Right Database Management Program.

    ERIC Educational Resources Information Center

    Vockell, Edward L.; Kopenec, Donald

    1989-01-01

    Provides a comparison of four database management programs commonly used in schools: AppleWorks, the DOS 3.3 and ProDOS versions of PFS, and MECC's Data Handler. Topics discussed include information storage, spelling checkers, editing functions, search strategies, graphs, printout formats, library applications, and HyperCard. (LRW)

  9. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  10. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  11. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  12. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  13. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  14. The Digital Age: Challenges for Records Management.

    ERIC Educational Resources Information Center

    Plocher, David

    1999-01-01

    Discusses advances in information technology that are being embraced by federal agencies and considers the implications for records management. Highlights include federal Web sites; the National Archives and Records Administration (NARA); and the impact of changing technology. (Author/LRW)

  15. Integration Experiences Casebook: Program Ideas in Aging and Developmental Disabilities.

    ERIC Educational Resources Information Center

    Janicki, Matthew P.; Keefe, Robert M.

    An assortment of 38 case studies illustrates efforts to integrate elderly individuals with developmental disabilities into generic aging services and into community life. The case studies include models and practice experiences that aided seniors to retire, participate in programs and services, and become part of their community's aging network.…

  16. Vocational Gerontology Program. Food Services for the Aged.

    ERIC Educational Resources Information Center

    Clark County School District, Las Vegas, NV.

    A project was proposed to expand the gerontology program at Rancho High School (Las Vegas, Nevada) into the area of food services for the aged. Development of a course in food services for the elderly would meet the students' needs for field experiences and entry-level job skills. Objectives of the proposed program included the following: (1)…

  17. Aeronautical Systems Division (AFSC) Program Management Resource Document.

    DTIC Science & Technology

    1981-09-30

    MANAGEMENT Definition . Program management consists of the actions involved in developing and producing deliverable end items on time, within the...CONFIGURATION MANAGEMENT Definition . Configuration management is the formal process of identifying the functional and physical characteristics of

  18. Modern evolutionary mechanics theories and resolving the programmed/non-programmed aging controversy.

    PubMed

    Goldsmith, Theodore C

    2014-10-01

    Modern programmed (adaptive) theories of biological aging contend that organisms including mammals have generally evolved mechanisms that purposely limit their lifespans in order to obtain an evolutionary benefit. Modern non-programmed theories contend that mammal aging generally results from natural deteriorative processes, and that lifespan differences between species are explained by differences in the degree to which they resist those processes. Originally proposed in the 19th century, programmed aging in mammals has historically been widely summarily rejected as obviously incompatible with the mechanics of the evolution process. However, relatively recent and continuing developments described here have dramatically changed this situation, and programmed mammal aging now has a better evolutionary basis than non-programmed aging. Resolution of this issue is critically important to medical research because the two theories predict that very different biological mechanisms are ultimately responsible for age-related diseases and conditions.

  19. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  20. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  1. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  2. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  3. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  4. Aging management guideline for commercial nuclear power plants - tanks and pools

    SciTech Connect

    Blocker, E.; Smith, S.; Philpot, L.; Conley, J.

    1996-02-01

    Continued operation of nuclear power plants for periods that extend beyond their original 40-year license period is a desirable option for many U.S. utilities. U.S. Nuclear Regulatory Commission (NRC) approval of operating license renewals is necessary before continued operation becomes a reality. Effective aging management for plant components is important to reliability and safety, regardless of current plant age or extended life expectations. However, the NRC requires that aging evaluations be performed and the effectiveness of aging management programs be demonstrated for components considered within the scope of license renewal before granting approval for operation beyond 40 years. Both the NRC and the utility want assurance that plant components will be highly reliable during both the current license term and throughout the extended operating period. In addition, effective aging management must be demonstrated to support Maintenance Rule (10 CFR 50.65) activities.

  5. Los Alamos National Laboratory Waste Management Program

    SciTech Connect

    Lopez-Escobedo, G.M.; Hargis, K.M.; Douglass, C.R.

    2007-07-01

    Los Alamos National Laboratory's (LANL) waste management program is responsible for disposition of waste generated by many of the LANL programs and operations. LANL generates liquid and solid waste that can include radioactive, hazardous, and other constituents. Where practical, LANL hazardous and mixed wastes are disposed through commercial vendors; low-level radioactive waste (LLW) and radioactive asbestos-contaminated waste are disposed on site at LANL's Area G disposal cells, transuranic (TRU) waste is disposed at the Waste Isolation Pilot Plant (WIPP), and high-activity mixed wastes are disposed at the Nevada Test Site (NTS) after treatment by commercial vendors. An on-site radioactive liquid waste treatment facility (RLWTF) removes the radioactive constituents from liquid wastes and treated water is released through an NPDES permitted outfall. LANL has a very successful waste minimization program. Routine hazardous waste generation has been reduced over 90% since 1993. LANL has a DOE Order 450.1-compliant environmental management system (EMS) that is ISO 14001 certified; waste minimization is integral to setting annual EMS improvement objectives. Looking forward, under the new LANL management and operating contractor, Los Alamos National Security (LANS) LLC, a Zero Liquid Discharge initiative is being planned that should eliminate flow to the RLWTF NPDES-permitted outfall. The new contractor is also taking action to reduce the number of permitted waste storage areas, to charge generating programs directly for the cost to disposition waste, and to simplify/streamline the waste system. (authors)

  6. Managing Your Multi-Age Classroom.

    ERIC Educational Resources Information Center

    Wall, Bonnie

    1994-01-01

    Examines the advantages of teaching in a multiage elementary classroom and discusses specific techniques that work well with children of different ages and abilities. Suggests that teachers need to integrate material as much as possible, balance large- and small-group activities, and utilize cooperative teams made up of students from each age…

  7. DoD Pest Management Program,

    DTIC Science & Technology

    1996-04-22

    Pest Management Program, as established under DoD Directive 4715.1, Section 125 of Title 10, United States Code, and the Joint Service Regulation, ’Joint Field Operating Agencies of the Office of The Surgeon General of the Army’ authorizes the publication of DoD 41 50.7-M, ’DoD Pest Management Training and Certification’ authorizes the publication of DoD 4150.7-P, ’DoD Plan for the Certification of Pesticide Applicators’ and designates the Secretary of the Army as the DoD Executive Agent for the Armed Forces Pest

  8. Children/Youth Physical Fitness Program Management System.

    ERIC Educational Resources Information Center

    Mozzini, Lou; And Others

    Intended for physical fitness program managers, this book presents a system through which these professionals can justify, evaluate, develop, supervise, and promote a sound physical fitness program. Sections address the management stages of: (1) program assessment; (2) program commitment; (3) physical fitness program planning; (4) program…

  9. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  10. The Indiana Chronic Disease Management Program.

    PubMed

    Rosenman, Marc B; Holmes, Ann M; Ackermann, Ronald T; Murray, Michael D; Doebbeling, Caroline Carney; Katz, Barry; Li, Jingjin; Zillich, Alan; Prescott, Victoria M; Downs, Stephen M; Inui, Thomas S

    2006-01-01

    The Indiana Chronic Disease Management Program (ICDMP) is intended to improve the quality and cost-effectiveness of care for Medicaid members with congestive heart failure (chronic heart failure), diabetes, asthma, and other conditions. The ICDMP is being assembled by Indiana Medicaid primarily from state and local resources and has seven components: (1) identification of eligible participants to create regional registries, (2) risk stratification of eligible participants, (3) nurse care management for high-risk participants, (4) telephonic intervention for all participants, (5) an Internet-based information system, (6) quality improvement collaboratives for primary care practices, and (7) program evaluation. The evaluation involves a randomized controlled trial in two inner-city group practices, as well as a statewide observational design. This article describes the ICDMP, highlights challenges, and discusses approaches to its evaluation.

  11. Coastal Zone Management program in Kerala, India

    SciTech Connect

    Mallik, T.K. )

    1987-01-01

    The physiographic setting of Kerala State, India, is unique. A narrow strip of the state contains a chain of lagoons and estuaries with a very high population density. The strip is subjected to severe coastal erosion during the monsoon season. A number of other problems are also associated with the coastal zone of Kerala, such as irregular dredging of black sands from the beaches, coastal flooding, hazards due to developmental activities, etc. A Coastal Zone Management Program was developed and administered by the Centre for Earth Science Studies, Trivandrum, to provide efficient coastal management and solve some of these problems. Various programs included under the Coastal Zone Management are the following: (1) Sedimentological, bathymetric, and geochemical studies of lagoons and estuaries; (2) monitoring of planimetric changes of beaches by profiling beaches during different seasons all along the coast; (3) studies of the nature, distribution, and provenance of black sand deposits from beaches; (4) studies of the peculiar occurrence of patchy, calm, turbid areas of water in the offshore containing high suspended sediment concentrate known as mud banks; (5) wave studies involving continuous monitoring of wave data all along the coast in order to understand wave climate and erosion; (6) sediment movement studies using fluorescent tracer to aid in the development of ports and harbors; (7) studies on various aspects of offshore. The outlines of the various programs discussed in this article will help other states and countries to develop a coastal zone management program according to the needs of the state or country and the nature of the problem occurring in the coastal zone.

  12. 1998 Environmental Management Science Program Annual Report

    SciTech Connect

    1999-03-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

  13. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  14. An integrated scheduling and program management system

    NASA Astrophysics Data System (ADS)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  15. 76 FR 47296 - Transit Asset Management (TAM) Pilot Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... Federal Transit Administration Transit Asset Management (TAM) Pilot Program Funds AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Transit Asset Management Pilot Program Announcement of Project Selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces...

  16. Recommendations for managing equipment aging in nuclear power plants

    SciTech Connect

    Gunther, W.E.; Subudhi, M. ); Aggarwal, S.K. )

    1992-01-01

    Research conducted under the auspices of the US NRC's Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures.

  17. Recommendations for managing equipment aging in nuclear power plants

    SciTech Connect

    Gunther, W.E.; Subudhi, M.; Aggarwal, S.K.

    1992-12-01

    Research conducted under the auspices of the US NRC`s Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures.

  18. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  19. Characteristics of Older Georgians Receiving Older Americans Act Nutrition Program Services and Other Home- and Community-Based Services: Findings from the Georgia Aging Information Management System (GA AIMS).

    PubMed

    Lee, Jung Sun; Shannon, Jerry; Brown, Arvine

    2015-01-01

    This descriptive study examined characteristics of older Georgians receiving Older Americans Act Nutrition Program Services and other home- and community-based services (HCBS) using state aging administrative data (N = 31,341, mean age: 76.6 ± 9.2 y, 71.2% female, 52.3% White). Home-delivered meals (HDM) was used most frequently. The characteristics of older Georgian HCBS participants varied by the type and number of HCBS received. Those receiving HDM and other in-home and caregiving services were more likely to show poorer sociodemographic, economic, and functional characteristics, and food insecurity. Those receiving multiple HCBS were most vulnerable, but showed lower level of food insecurity than those receiving single HCBS, suggesting potential combined benefits of receiving multiple programs. This study underscores the importance of documenting dynamic needs for HCBS, especially HDM, among vulnerable older adults as part of standard administrative process to identify those at high risk of institutionalization, optimize HCBS delivery and coordination, and maximize HCBS benefits.

  20. Business management in the information age

    NASA Astrophysics Data System (ADS)

    Misawa, Chiyoji

    This is the record of the Special Lecture at the 25th Annual Meeting on Information Science and Technology. In the first half, how managers should collect and utilize the scientific and technical information is described, based on the author' own experience. Author says they should visit the source organization by themselves when they find the interesting information. To make high use of such information, they are needed to be well acquainted with the conditions of their own facilities and technology etc., he mentions. In the second half, from historical point of view, the development of Japanese industry and technology for the past 40 years is reviewed, and he expects the databases would be utilized promote the research and development in order to make our country have a new energy resources.

  1. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  2. 77 FR 12905 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Program Management Committee. DATES: The meeting will be held March 21, 2012, from 8:30 a.m.-1:30...

  3. 78 FR 33144 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Program Management Committee. DATES: The meeting will be held June 19, 2013, from 8:30 a.m.-1:30...

  4. 77 FR 31421 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Program Management Committee. DATES: The meeting will be held June 13, 2012, from 8:30 a.m.-1:30...

  5. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31 Section 237.31 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  6. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Adoption of bridge management programs. 237.31 Section 237.31 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  7. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31 Section 237.31 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  8. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  9. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  10. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  11. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  12. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  13. An Analysis of the Radio Program Manager Occupation.

    ERIC Educational Resources Information Center

    Friedberg, Jerry; Stella, Phillip.

    This occupational analysis data was assembled to help broadcasting arts teachers develop a course of study in program management for junior and senior high school students. Following a job description for a program manager, the remainder of the content in standard task analysis format presents an analysis of nine program management duties (tasks).…

  14. University Program Management Information System: NASA's University Program Active Projects

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  15. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  16. The role of the case manager in a disease management program.

    PubMed

    Huston, Carol J

    2002-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  17. The role of the case manager in a disease management program.

    PubMed

    Huston, C J

    2001-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  18. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary

    1997-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  19. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  20. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and Atmospheric Administration (NOAA... Impact Statement (DEIS) prepared by NOAA's Office of Ocean and Coastal Resource Management. The...

  1. Effectiveness of the Vital Aging program to promote active aging in Mexican older adults

    PubMed Central

    Mendoza-Ruvalcaba, Neyda Ma; Fernández-Ballesteros, Rocío

    2016-01-01

    Introduction Aging is not only a population phenomenon but also an experience and an individual reality. Vital Aging® is a program that considers active aging as the lifelong adaptation process of maximizing health and independence, physical and cognitive functioning, positive affect regulation and control, and social engagement. Through its different versions and editions, it has demonstrated being an effective program to promote active aging. The aim of this study is to determine the effectiveness of the “face-to-face” and “combined” versions of the program to promote active aging in Mexican older adults trial. Methods Seventy-six older adults aged 60 years and over participated in a quasi-experimental study and were recruited in a senior center to participate in the two experimental conditions: Vital Aging face-to-face (VA-FF) (n=35) and Vital Aging combined (VA-C; multimedia/face-to-face) (n=15), and the remaining 26 adults were assigned to a control group. Pretest and posttest assessments were performed after the theoretical–practical intervention. Mean differences and size effects were calculated for estimating the effect of the program. Results At the end of the study, participants showed improvements in the active aging outcome measures. Positive effects were observed in the frequency of intellectual, cultural – artistic, and social activities, perceptions of aging, satisfaction with social relationships, and self-efficacy for aging. Additionally, those who participated in VA-FF showed better memory performance, meta-memory, and a trend to report less memory problems, while older persons in VA-C showed a trend to have better life satisfaction. No effects were observed in physical activity, frequency of social relationships, and subjective health. Conclusion Findings show that the Vital Aging program in face-to-face and combined versions encourages active aging in Mexican older persons. These results are in general similar to those found in

  2. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... for the overall management of all programs including: (1) Eligibility verification systems...

  3. Roof Management Program--Three Steps to Success.

    ERIC Educational Resources Information Center

    Young, D. B., Jr.

    1987-01-01

    A roof management program protects the capital investment of a new roof. Steps to create a program are (1) assemble roof information files, (2) implement a roof inspection program with periodic inspection, and (3) establish maintenance scheduling and implementation. (MLF)

  4. Fact Sheet: Risk Management Plan (RMP) Audit Program

    EPA Pesticide Factsheets

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  5. Managing in an age of modularity.

    PubMed

    Baldwin, C Y; Clark, K B

    1997-01-01

    Modularity is a familiar principle in the computer industry. Different companies can independently design and produce components, suck as disk drives or operating software, and those modules will fit together into a complex and smoothly functioning product because the module makers obey a given set of design rules. Modularity in manufacturing is already common in many companies. But now a number of them are beginning to extend the approach into the design of their products and services. Modularity in design should tremendously boost the rate of innovation in many industries as it did in the computer industry. As businesses as diverse as auto manufacturing and financial services move toward modular designs, the authors say, competitive dynamics will change enormously. No longer will assemblers control the final product: suppliers of key modules will gain leverage and even take on responsibility for design rules. Companies will compete either by specifying the dominant design rules (as Microsoft does) or by producing excellent modules (as disk drive maker Quantum does). Leaders in a modular industry will control less, so they will have to watch the competitive environment closely for opportunities to link up with other module makers. They will also need to know more: engineering details that seemed trivial at the corporate level may now play a large part in strategic decisions. Leaders will also become knowledge managers internally because they will need to coordinate the efforts of development groups in order to keep them focused on the modular strategies the company is pursuing.

  6. 14 CFR 91.1003 - Management contract between owner and program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Management contract between owner and... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager... the program manager pertaining to the operational safety of the program and those records required...

  7. Aging of perennial cells and organ parts according to the programmed aging paradigm.

    PubMed

    Libertini, Giacinto; Ferrara, Nicola

    2016-04-01

    If aging is a physiological phenomenon-as maintained by the programmed aging paradigm-it must be caused by specific genetically determined and regulated mechanisms, which must be confirmed by evidence. Within the programmed aging paradigm, a complete proposal starts from the observation that cells, tissues, and organs show continuous turnover: As telomere shortening determines both limits to cell replication and a progressive impairment of cellular functions, a progressive decline in age-related fitness decline (i.e., aging) is a clear consequence. Against this hypothesis, a critic might argue that there are cells (most types of neurons) and organ parts (crystalline core and tooth enamel) that have no turnover and are subject to wear or manifest alterations similar to those of cells with turnover. In this review, it is shown how cell types without turnover appear to be strictly dependent on cells subjected to turnover. The loss or weakening of the functions fulfilled by these cells with turnover, due to telomere shortening and turnover slowing, compromises the vitality of the served cells without turnover. This determines well-known clinical manifestations, which in their early forms are described as distinct diseases (e.g., Alzheimer's disease, Parkinson's disease, age-related macular degeneration, etc.). Moreover, for the two organ parts (crystalline core and tooth enamel) without viable cells or any cell turnover, it is discussed how this is entirely compatible with the programmed aging paradigm.

  8. VISION SCREENING PROGRAMS, PRE-SCHOOL AND SCHOOL AGE.

    ERIC Educational Resources Information Center

    TREGANZA, AMORITA; AND OTHERS

    VISION PROBLEMS CAN BE DETECTED IN PRESCHOOL AND SCHOOL AGE CHILDREN BY THE USE OF THE APPROPRIATE TESTS OUTLINED IN THIS BOOKLET. THESE TESTS ARE DESIGNED TO BE ADMINISTERED IN PART BY LAY PERSONNEL UNDER THE DIRECTION OF AN OPTOMETRIC CONSULTANT. THE ENTIRE PROGRAM CONSISTS OF THE COMPLETION OF A DEVELOPMENTAL QUESTIONNAIRE BY THE PARENTS, AN…

  9. Experiences with physical conditioning programs in middle-aged men

    NASA Technical Reports Server (NTRS)

    Schuster, B.; Stanley, E.

    1969-01-01

    Long term effects of physical exercise and conditioning in the prevention and treatment of coronary heart disease are studied. Some aspects of the problem are outlined and difficulties encountered in a group of middle aged business executives using a carefully prescribed, but non-regimented and loosely supervised conditioning program employing commonly used forms of exercise (bicycling and jogging), are described.

  10. [Happy and healthy aging: well-being, resources and self-management abilities].

    PubMed

    Steverink, N

    2009-12-01

    This article gives an overview of the research program directed by the author. First, the integrated theoretical framework of the program is presented, including sub-theories. The following assumptions are central to the program: (a) there are physical and social basic needs that, if not fulfilled, lead to deficits in well-being; (b) for the fulfilment of these basic needs both external resources and self-management abilities (internal resources) are needed; (c) self-management abilities and external resources mutually influence each other, which makes it possible to intervene. This theoretical basis allows the formulation of clear criteria for happy and healthy aging, and the derivation of the most important (social) conditions that influence the fulfilment of the basic needs. The article also presents the main empirical tests and intervention studies that have been executed, along with the first steps that have been taken to implement the interventions in practice. Recently, the program is focussing more on a lifespan perspective because important influences on happy and healthy aging often originate at younger ages. More insight in the life-span development of external resources and of self-management ability promises a better understanding of what happy and healthy aging is about and of what can be done to positively influence it.

  11. The watershed and river systems management program

    USGS Publications Warehouse

    Markstrom, S.L.; Frevert, D.; Leavesley, G.H.; ,

    2005-01-01

    The Watershed and River System Management Program (WaRSMP), a joint effort between the U.S. Geological Survey (USGS) and the U.S. Bureau of Reclamation (Reclamation), is focused on research and development of decision support systems and their application to achieve an equitable balance among diverse water resource management demands. Considerations include: (1) legal and political constraints; (2) stake holder and consensus-building; (3) sound technical knowledge; (4) flood control, consumptive use, and hydropower; (5) water transfers; (6) irrigation return flows and water quality; (7) recreation; (8) habitat for endangered species; (9) water supply and proration; (10) near-surface groundwater; and (11) water ownership, accounting, and rights. To address the interdisciplinary and multi-stake holder needs of real-time watershed management, WaRSMP has developed a decision support system toolbox. The USGS Object User Interface facilitates the coupling of Reclamation's RiverWare reservoir operations model with the USGS Modular Modeling and Precipitation Runoff Modeling Systems through a central database. This integration is accomplished through the use of Model and Data Management Interfaces. WaRSMP applications include Colorado River Main stem and Gunnison Basin, the Yakima Basin, the Middle Rio Grande Basin, the Truckee-Carson Basin, and the Umatilla Basin.

  12. Program Helps Generate And Manage Graphics

    NASA Technical Reports Server (NTRS)

    Truong, L. V.

    1994-01-01

    Living Color Frame Maker (LCFM) computer program generates computer-graphics frames. Graphical frames saved as text files, in readable and disclosed format, easily retrieved and manipulated by user programs for wide range of real-time visual information applications. LCFM implemented in frame-based expert system for visual aids in management of systems. Monitoring, diagnosis, and/or control, diagrams of circuits or systems brought to "life" by use of designated video colors and intensities to symbolize status of hardware components (via real-time feedback from sensors). Status of systems can be displayed. Written in C++ using Borland C++ 2.0 compiler for IBM PC-series computers and compatible computers running MS-DOS.

  13. Timing Issues with Early Childhood Education Programs: How Effect Sizes Vary by Starting Age, Program Duration and Persistence of Effects

    ERIC Educational Resources Information Center

    Duncan, Greg J.; Leak, James A.; Li, Weilin; Magnuson, Katherine; Schindler, Holly; Yoshikawa, Hiro

    2011-01-01

    The focus of this paper centers around timing associated with early childhood education programs and interventions using meta-analytic methods. At any given assessment age, a child's current age equals starting age, plus duration of program, plus years since program ended. Variability in assessment ages across the studies should enable everyone to…

  14. The Oak Ridge Refrigerant Management Program

    NASA Technical Reports Server (NTRS)

    Kevil, Thomas H.

    1995-01-01

    For many years, chlorofluorocarbons (CFC's) have been used by the Department of Energy's (DOE) Oak Ridge Y-12 Plant in air conditioning and process refrigeration systems. However, Title 6 of the Clean Air Act Amendments (CAAA) and Executive Order 12843 (Procurement Requirements and Policies for Federal Agencies for Ozone Depleting Substances) signed by President Clinton require, as policy, that all federal agencies maximize their use of safe, alternate refrigerants and minimize, where economically practical, the use of Class 1 refrigerants. Unfortunately, many government facilities and industrial plants have no plan or strategy in place to make this changeover, even though their air conditioning and process refrigeration equipment may not be sustainable after CFC production ends December 31, 1995. The Y-12 Plant in Oak Ridge, Tennessee, has taken an aggressive approach to complying with the CAAA and is working with private industry and other government agencies to solve tough manufacturing and application problems associated with CFC and hydrochlorofluorocarbon (HCFC) alternatives. Y-12 was the first DOE Defense Program (DP) facility to develop a long-range Stratospheric Ozone Protection Plan for refrigerant management for compliance with the CAAA. It was also the first DOE DP facility to complete detailed engineering studies on retrofitting and replacing all air conditioning and process refrigeration equipment to enable operation with alternate refrigerants. The management plan and engineering studies are models for use by other government agencies, manufacturing plants, and private industry. This presentation identifies some of the hidden pitfalls to be encountered in the accelerated phaseout schedule of CFC's and explains how to overcome and prevent these problems. In addition, it outlines the general issues that must be considered when addressing the phase-out of ozone depleting substances and gives some 'lessons learned' by Y-12 from its Refrigerant Management

  15. The Ruby Red Slipper Program: an interdisciplinary fall management program in a community academic medical center.

    PubMed

    Wexler, Sharon Stahl; D'Amico, Catherine O'Neill; Foster, Norma; Cataldo, Karen A; Brody, Patricia; Huang, Zheng-Bo

    2011-01-01

    Falls are a common, yet serious complication for hospitalized patients. The Ruby Red Slipper Program is an interdisciplinary fall management program that includes development and education of unit-based fall management teams. Initial outcomes demonstrated significant reductions in falls.

  16. [Health economic evaluation of disease management programs].

    PubMed

    Greiner, W

    2006-01-01

    Disease management has become an important element in the improvement of care for people with chronic illnesses and has become embedded in the discussion on health policy in recent years. The approach has been introduced very differently to the health systems worldwide. Since 1 January 2003 accredited disease management programs (DMPs) have been a part of the risk structure compensation scheme of the German statutory health insurance. This is seen as the first step to a morbidity orientation of the risk structure compensation. DMPs have to be evaluated according the German Social Law, especially whether the objectives of the programs and the criteria for inclusion of the patients have been met and the quality of care for the patients is insured. The criteria for evaluation are threefold: medical issues, economic issues and subjective quality of life of the patients. Due to the immense amounts of data which can be expected the evaluation of the German DMPs is a huge logistical challenge. Until now not very much is known about the data quality. The evaluation is focused on the perspective of the sickness funds as e.g. information about indirect cost is not collected. In the article the methods for evaluation are described and critically discussed.

  17. Farm Business and Production Management Program Course Competency Record.

    ERIC Educational Resources Information Center

    Madison Area Technical Coll., WI.

    This course competency record is intended to help teachers rate development of student competencies in a farm business and production management program. Competencies are listed for six courses: operating the farm business, soil management, crop management, livestock nutrition, livestock management/farmstead equipment management, and farm records…

  18. Decision Support System for ASD (Aeronatical Systems Division) Program Managers.

    DTIC Science & Technology

    1985-09-01

    quality of the decision depends on the depth of the program manager’s analysis . Recently, management has attempted to use the support of others to make...knowledge of system analysis and management techniques. 4. Program Managers will have access to the developed deci- sion support system. Definitions...the depth of the Progr a Managers analysis . A decision is more apt to be correct if the depth of analysis is increased (21:a-8). The depth of analysis

  19. Development and Implementation of a Program Management Maturity Model

    SciTech Connect

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  20. Nuclear Waste Management Program summary document, FY 1981

    SciTech Connect

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  1. Uncertainty in age-specific harvest estimates and consequences for white-tailed deer management

    USGS Publications Warehouse

    Collier, B.A.; Krementz, D.G.

    2007-01-01

    Age structure proportions (proportion of harvested individuals within each age class) are commonly used as support for regulatory restrictions and input for deer population models. Such use requires critical evaluation when harvest regulations force hunters to selectively harvest specific age classes, due to impact on the underlying population age structure. We used a stochastic population simulation model to evaluate the impact of using harvest proportions to evaluate changes in population age structure under a selective harvest management program at two scales. Using harvest proportions to parameterize the age-specific harvest segment of the model for the local scale showed that predictions of post-harvest age structure did not vary dependent upon whether selective harvest criteria were in use or not. At the county scale, yearling frequency in the post-harvest population increased, but model predictions indicated that post-harvest population size of 2.5 years old males would decline below levels found before implementation of the antler restriction, reducing the number of individuals recruited into older age classes. Across the range of age-specific harvest rates modeled, our simulation predicted that underestimation of age-specific harvest rates has considerable influence on predictions of post-harvest population age structure. We found that the consequence of uncertainty in harvest rates corresponds to uncertainty in predictions of residual population structure, and this correspondence is proportional to scale. Our simulations also indicate that regardless of use of harvest proportions or harvest rates, at either the local or county scale the modeled SHC had a high probability (>0.60 and >0.75, respectively) of eliminating recruitment into >2.5 years old age classes. Although frequently used to increase population age structure, our modeling indicated that selective harvest criteria can decrease or eliminate the number of white-tailed deer recruited into older

  2. 78 FR 14151 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held March 20, 2013, from 8:30 a.m.-1:30 p.m. ADDRESSES:...

  3. 78 FR 43962 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held August 12, from 10:00 a.m.-2:00 p.m. ADDRESSES:...

  4. 78 FR 57673 - RTCA Program Management Committee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... Federal Aviation Administration RTCA Program Management Committee; Meeting AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held October 8, 2013 from 8:30 a.m.-1:30 a.m. ADDRESSES:...

  5. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    ERIC Educational Resources Information Center

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  6. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  7. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  8. SNL/CA Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  9. Greenhouse Gas Management Program Overview (Fact Sheet)

    SciTech Connect

    Not Available

    2011-11-01

    Program fact sheet highlighting federal requirements for GHG emissions management, FEMP services to help agencies reduce emissions, and additional resources. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) assists Federal agencies with managing their greenhouse gas (GHG) emissions. GHG management entails measuring emissions and understanding their sources, setting a goal for reducing emissions, developing a plan to meet this goal, and implementing the plan to achieve reductions in emissions. FEMP provides the following services to help Federal agencies meet the requirements of inventorying and reducing their GHG emissions: (1) FEMP offers one-on-one technical assistance to help agencies understand and implement the Federal Greenhouse Gas Accounting and Reporting Guidance and fulfill their inventory reporting requirements. (2) FEMP provides training, tools, and resources on FedCenter to help agencies complete their annual inventories. (3) FEMP serves a leadership role in the interagency Federal Working Group on Greenhouse Gas Accounting and Reporting that develops recommendations to the Council on Environmental Quality (CEQ) for the Federal Greenhouse Gas Accounting and Reporting Guidance. (4) As the focus continues to shift from measuring emissions (completing inventories) to mitigating emissions (achieving reductions), FEMP is developing a strategic planning framework and resources for agencies to prioritize among a variety of options for mitigating their GHG emissions, so that they achieve their reduction goals in the most cost-effective manner. These resources will help agencies analyze their high-quality inventories to make strategic decisions about where to use limited resources to have the greatest impact on reducing emissions. Greenhouse gases trap heat in the lower atmosphere, warming the earth's surface temperature in a natural process known as the 'greenhouse effect.' GHGs include carbon dioxide (CO{sub 2}), methane (CH{sub 4

  10. Acquisition Program Risk Management: Does the Department of Defense Risk Management Practices Guide Provide an Effective Risk Tool for Program Managers in Today’s Acquisition Environment?

    DTIC Science & Technology

    2012-05-01

    Management Definition ........................................................................................... 32 Table 16. Risk Management Tracking...Other (please specify) 5 Table 15. Risk Management Definition Question 7: Does your Program Office or Risk Management IPT track risks for cost...aligned to collect information on program risk definition. Question 6 was designed to collect information on risk management definition . Participants

  11. Adult Age Differences in Processing Narrative Text: Managing Character Representations

    ERIC Educational Resources Information Center

    Noh, Soo Rim

    2009-01-01

    Understanding a narrative situation depends on keeping track of multiple characters that enter and exit dynamically as the plot unfolds. Because there has been no systematic investigation of age differences in the ability to manage multiple characters during narrative comprehension, this project was designed to examine those differences in this…

  12. Informing Reactor Aging Management by Extended Risk Methodology

    SciTech Connect

    Unwin, Stephen D.; Lowry, Peter P.; Toyooka, Michael Y.

    2009-07-01

    This is a paper summary to be published in the proceedings of the Winter Meeting of the American Nuclear Society. It describes a method for expanding probabilistic risk assessment models to address issues associated with the management of aging nuclear power plants and the prioritization of materials degradation research.

  13. Evaluation of a Rural-Based Community Aged Intensive Recovery Program for Older Adults With Severe Mental Illness.

    PubMed

    Sadler, Paul; McIlvena, Andrea

    2015-09-01

    Community Aged Intensive Recovery (CAIR) programs are an integral part of Aged Persons Mental Health Services (APMHS); however, no study has investigated whether a rural-based intensive program benefits older clients with severe mental illness. The current sample comprised 119 older adults who were being managed by a CAIR program from July 2011 to June 2013. Three key results were found: (a) approximately three quarters of clients admitted to the CAIR program remained treated in the community; (b) the program assisted in significantly reducing the level of psychiatric symptom severity from CAIR entry to CAIR exit; and (c) the APMHS team with the CAIR program had a lower psychiatric inpatient rate compared to the APMHS team without the program. The current study highlights the importance of delivering effective rural-based CAIR programs to older adults experiencing severe mental illness.

  14. Aging management of containment structures in nuclear power plants

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.R.; Graves, H.L. III; Norris, W.E.

    1994-12-31

    Research is being conducted by ORNL under US Nuclear Regulatory Commission (USNRC) sponsorship to address aging management of nuclear power plant containment and other safety-related structures. Documentation is being prepared to provide the USNRC with potential structural safety issues and acceptance criteria for use in continued service evaluations of nuclear power plants. Accomplishments include development of a Structural Materials Information Center containing data and information on the time variation of 144 material properties under the influence of pertinent environmental stressors or aging factors, evaluation of models for potential concrete containment degradation factors, development of a procedure to identify critical structures and degradation factors important to aging management, evaluations of nondestructive evaluation techniques. assessments of European and North American repair practices for concrete, review of parameters affecting corrosion of metals embedded in concrete, and development of methodologies for making current condition assessments and service life predictions of new or existing reinforced concrete structures in nuclear power plants.

  15. Aging Management Guideline for commercial nuclear power plants: Battery chargers, inverters and uninterruptible power supplies. Final report

    SciTech Connect

    Berg, R.; Stroinski, M.; Giachetti, R.

    1994-02-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant battery chargers, inverters and uninterruptible power supplies important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already, experienced) and aging management program activities to the more generic results and recommendations presented herein.

  16. The Grateful Aging Program: A Naturalistic Model of Transformation and Healing into the Second Half of Life

    PubMed Central

    Schlitz, Marilyn

    2017-01-01

    Objectives: Understanding and managing the process of aging is a central issue in modern society. This is a critical factor given the demographic shift toward an aging population and the negative stereotypes around aging that can limit people’s worldview on aging with gratitude and well-being. Methods: Building on three decades of qualitative and quantitative studies on positive worldview transformation at the California-based Institute of Noetic Sciences, this article applies an empirically derived naturalistic model of transformation to aging. The Grateful Aging Program is introduced as a set of transformative steps to promote well-being and to shift fear of aging into inspiration for living well. Results: Nine steps to Grateful Aging are identified: 1) answer the call to transformation, 2) cultivate curiosity, 3) formalize a Grateful Aging practice, 4) set intention for Grateful Aging, 5) pay attention to the gifts of aging, 6) build Grateful Aging habits, 7) find guidance, 8) move to acceptance, and 9) transform self and society. Educational programs are described for elderly patients and for the health care professionals who serve them. Conclusion: The Grateful Aging Program is designed to expand awareness of healthy, mindful, and meaningful aging; to promote individual and social well-being; and to facilitate a supportive atmosphere for personal enrichment and shared learning. PMID:28241911

  17. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  18. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  19. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Drug utilization management, quality assurance, and... Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). (a... D plan, a drug utilization management program, quality assurance measures and systems, and an...

  20. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Drug utilization management, quality assurance, and... management, quality assurance, and medication therapy management programs (MTMPs). (a) General rule. Each... utilization management program, quality assurance measures and systems, and an MTMP as described in...

  1. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Drug utilization management, quality assurance, and... management, quality assurance, and medication therapy management programs (MTMPs). (a) General rule. Each... utilization management program, quality assurance measures and systems, and an MTMP as described in...

  2. Lessons Learned from the Everglades Collaborative Adaptive Management Program

    EPA Science Inventory

    Recent technical papers explore whether adaptive management (AM) is useful for environmental management and restoration efforts and discuss the many challenges to overcome for successful implementation, especially for large-scale restoration programs (McLain and Lee 1996; Levine ...

  3. 75 FR 70966 - Transit Asset Management (TAM) Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... Federal Transit Administration Transit Asset Management (TAM) Pilot Program AGENCY: Federal Transit... Federal Transit Administration (FTA) is soliciting proposals from public transportation providers, state... partnership--to demonstrate effective Transit Asset Management (TAM) systems and ``best practices'', which...

  4. PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the Environment Management Division, Directorate of Public Works, Fort Benning, Georgia) Delineator unknown. GARAGES - Fort Benning, Building No. 864, 7325 Miller Loop, Main Post, Fort Benning Military Reservation, Chattahoochee County, GA

  5. Systems approach provides management control of complex programs

    NASA Technical Reports Server (NTRS)

    Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.

    1970-01-01

    Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

  6. Developing a Management Curriculum for a Cytotechnology Training Program.

    ERIC Educational Resources Information Center

    Miller, Maureen E.

    This study reviewed the literature in the field of health care management, particularly that which pertains to the management of the clinical laboratory. The research cited should help cytotechnology educators in planning a management curriculum and developing program objectives to train cytotechnologists in management. The report is an annotated…

  7. Information Technology Program Management: Is There a Difference?

    DTIC Science & Technology

    2014-06-01

    Federal Acquisition Reform Act FL functional leader GAO Government Accountability Office IT information technology ITMRA Information Technology Management Reform...Implementation Plan to Reform Federal Information Technology Management . One main topic of discussion focused on strengthening program management by...Defense Authorization Act of Fiscal Year 1996. The CCA is comprised of two acts: the Information Technology Management Reform Act (ITMRA) (Division E

  8. Successful Management of Public School Capital Improvement Programs.

    ERIC Educational Resources Information Center

    Filardo, Mary

    2000-01-01

    In 1999, the 21st Century School Fund interviewed seven large school districts regarding management of capital-improvement programs. Researchers found three basic models: in-house management, other-public-agency management, and private-sector management. Systematic oversight and quality-control approaches will protect school systems from…

  9. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    EPA Pesticide Factsheets

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  10. Microcomputerizing Your Paperwork. Part III: Financial Management Programs.

    ERIC Educational Resources Information Center

    Pogrow, Stanley

    1982-01-01

    Examines computerized financial accounting programs that can help administrators with the management of school finances. A detailed chart of financial accounting software packages for microcomputers is included. (JJD)

  11. Psychological and Biochemical Effects of a Stress Management Program,

    DTIC Science & Technology

    risk factors for cardiovascular disease . We wanted to sample emotional, behavioral, physical and biochemical measures which might be sensitive to the changes of an effective stress management program.

  12. Effectiveness of a Video-based Aging Services Technology Education Program for Health Care Professionals.

    PubMed

    Weakley, Alyssa; Tam, Joyce W; Van Son, Catherine; Schmitter-Edgecombe, Maureen

    2017-01-19

    Health care professionals (HCPs) are a critical source of recommendations for older adults. Aging services technologies (ASTs), which include devices to support the health-care needs of older adults, are underutilized despite evidence for improving functional outcomes and safety and reducing caregiver burden and health costs. This study evaluated a video-based educational program aimed at improving HCP awareness of ASTs. Sixty-five HCPs viewed AST videos related to medication management, daily living, and memory. Following the program, participants' objective and perceived AST knowledge improved, as did self-efficacy and anticipated AST engagement. About 95% of participants stated they were more likely to recommend ASTs post-program. Participants benefitted equally regardless of years of experience or previous AST familiarity. Furthermore, change in self-efficacy and perceived knowledge were significant predictors of engagement change. Overall, the educational program was effective in improving HCPs' awareness of ASTs and appeared to benefit all participants regardless of experience and prior knowledge.

  13. Development of a Program Manager/User Communication Evaluation Tool.

    DTIC Science & Technology

    1987-09-01

    TECHNOLOGY Wright-Patterson Air Force Base , Ohio * ~ I IBUON STATEMEN2T AL Appra~id for public r.eaa. . .1. ... Ty..IU..4 6*..IP AFIT/GLM/LSM/87S-8 ~El...managers construct messages based on what the program manager feels is important and not necessarily what is important to the receiver. A communications...Manager/User Communication .. ......... 5- 5 Develop a Program Manager/User Communication Evaluation Tool, Based Upon the Attributes of Communications

  14. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program... assignment of responsibility for completing products developed in support to program-level activities. (3) In... incorporate new or changed information that affects the scope, schedule, or budget of the activities...

  15. SNL/CA Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  16. Recommendations for managing cutaneous disorders associated with advancing age

    PubMed Central

    Humbert, Philippe; Dréno, Brigitte; Krutmann, Jean; Luger, Thomas Anton; Triller, Raoul; Meaume, Sylvie; Seité, Sophie

    2016-01-01

    The increasingly aged population worldwide means more people are living with chronic diseases, reduced autonomy, and taking various medications. Health professionals should take these into consideration when managing dermatological problems in elderly patients. Accordingly, current research is investigating the dermatological problems associated with the loss of cutaneous function with age. As cell renewal slows, the physical and chemical barrier function declines, cutaneous permeability increases, and the skin becomes increasingly vulnerable to external factors. In geriatric dermatology, the consequences of cutaneous aging lead to xerosis, skin folding, moisture-associated skin damage, and impaired wound healing. These problems pose significant challenges for both the elderly and their carers. Most often, nurses manage skin care in the elderly. However, until recently, little attention has been paid to developing appropriate, evidence-based, skincare protocols. The objective of this paper is to highlight common clinical problems with aging skin and provide some appropriate advice on cosmetic protocols for managing them. A review of the literature from 2004 to 2014 using PubMed was performed by a working group of six European dermatologists with clinical and research experience in dermatology. Basic topical therapy can restore and protect skin barrier function, which relieves problems associated with xerosis, prevents aggravating moisture-associated skin damage, and enhances quality of life. In conclusion, the authors provide physicians with practical recommendations to assist them in implementing basic skin care for the elderly in an integrated care approach. PMID:26929610

  17. 10 CFR Appendix A to Subpart E of... - DOE Federally Assisted Programs Containing Age Distinctions

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false DOE Federally Assisted Programs Containing Age...) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES Nondiscrimination on the Basis of Age-Age... Federally Assisted Programs Containing Age Distinctions Statute, Name, Public Law, and U.S. Code Section...

  18. 10 CFR Appendix A to Subpart E of... - DOE Federally Assisted Programs Containing Age Distinctions

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false DOE Federally Assisted Programs Containing Age...) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES Nondiscrimination on the Basis of Age-Age... Federally Assisted Programs Containing Age Distinctions Statute, Name, Public Law, and U.S. Code Section...

  19. Recommendations for improvements to program and project management

    SciTech Connect

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  20. Activation of an adipogenic program in adult myoblasts with age.

    PubMed

    Taylor-Jones, Jane M; McGehee, Robert E; Rando, Thomas A; Lecka-Czernik, Beata; Lipschitz, David A; Peterson, Charlotte A

    2002-03-31

    Myoblasts isolated from mouse hindlimb skeletal muscle demonstrated increased adipogenic potential as a function of age. Whereas myoblasts from 8-month-old adult mice did not significantly accumulate terminal markers of adipogenesis regardless of culture conditions, myoblasts from 23-month-old mice accumulated fat and expressed genes characteristic of differentiated adipocytes, such as the fatty acid binding protein aP2. This change in differentiation potential was associated with a change in the abundance of the mRNA encoding the transcription factor C/EBPalpha, and in the relative abundance of PPARgamma2 to PPARgamma1 mRNAs. Furthermore, PPARgamma activity appeared to be regulated at the level of phosphorylation, being more highly phosphorylated in myoblasts isolated from younger animals. Although adipogenic gene expression in myoblasts from aged animals was activated, presumably in response to PPARgamma and C/EBPalpha, unexpectedly, myogenic gene expression was not effectively repressed. The Wnt signaling pathway may also alter differentiation potential in muscle with age. Wnt-10b mRNA was more abundantly expressed in muscle tissue and cultured myoblasts from adult compared with aged mice, resulting in stabilization of cytosolic beta-catenin, that may potentially contribute to inhibition of adipogenic gene expression in adult myoblasts. The changes reported here, together with those reported in bone marrow stroma with age, suggest that a default program may be activated in mesenchymal cells with increasing age resulting in a more adipogenic-like phenotype. Whether this change in differentiation potential contributes to the increased adiposity in muscle with age remains to be determined.

  1. Management of Programs with Declining Enrollments.

    ERIC Educational Resources Information Center

    1980

    The time to begin caring about declining enrollments in community college programs is before the program is started. Program planning should take into account why industry is demanding a given program "right now," avoid developing crash programs, and obtain and utilize all of the information possible including survey data, Labor Department…

  2. Improving Voluntary Environmental Management Programs: Facilitating Learning and Adaptation

    NASA Astrophysics Data System (ADS)

    Genskow, Kenneth D.; Wood, Danielle M.

    2011-05-01

    Environmental planners and managers face unique challenges understanding and documenting the effectiveness of programs that rely on voluntary actions by private landowners. Programs, such as those aimed at reducing nonpoint source pollution or improving habitat, intend to reach those goals by persuading landowners to adopt behaviors and management practices consistent with environmental restoration and protection. Our purpose with this paper is to identify barriers for improving voluntary environmental management programs and ways to overcome them. We first draw upon insights regarding data, learning, and adaptation from the adaptive management and performance management literatures, describing three key issues: overcoming information constraints, structural limitations, and organizational culture. Although these lessons are applicable to a variety of voluntary environmental management programs, we then present the issues in the context of on-going research for nonpoint source water quality pollution. We end the discussion by highlighting important elements for advancing voluntary program efforts.

  3. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1995 annual report.

    SciTech Connect

    Young, Franklin R.

    1997-04-01

    Report on progress on evaluation of the Columbia River Northern Squawfish Management Program in 1995. The objectives in 1995 were to (1) evaluate exploitation rate and size composition of northern squawfish captured in various fisheries, and estimate reductions in predation on juvenile salmonids since implementation of the Northern Squawfish Management Program; and (2) evaluate changes through 1995 in relative abundance, consumption, size and age structure, growth, and fecundity of northern squawfish in lower Columbia and Snake River reservoirs and in the Columbia River downstream from Bonneville Dam.

  4. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1994 Annual Report.

    SciTech Connect

    Young, Franklin R.; Willis, Charles F.

    1995-09-01

    Report on the progress on evaluation of the Northern Squawfish Management Program in 1994. The objectives in 1994 were to (1) evaluate exploitation rate, size composition, and incidental catch of northern squawfish (Ptychocheilus oregonensis) captured in the various fisheries and estimate reductions in predation on juvenile salmonids since implementation of the management program, and (2) evaluate changes through 1994 in relative abundance, smolt consumption rate, size and age structure, growth, and fecundity of northern squawfish in lower Columbia and Snake River reservoirs and the Columbia River downstream from Bonneville Dam.

  5. Ageing management of french NPP civil work structures

    NASA Astrophysics Data System (ADS)

    Gallitre, E.; Dauffer, D.

    2011-04-01

    This paper presents EDF practice about concrete structure ageing management, from the mechanisms analysis to the formal procedure which allows the French company to increase 900 MWe NPP lifetime until 40 years; it will also introduce its action plan for 60 years lifetime extension. This practice is based on a methodology which identifies every ageing mechanism; both plants feedback and state of the art are screened and conclusions are drawn up into an "ageing analysis data sheet". That leads at first to a collection of 57 data sheets which give the mechanism identification, the components that are concerned and an analysis grid which is designed to assess the safety risk. This analysis screens the reference documents describing the mechanism, the design lifetime hypotheses, the associated regulation or codification, the feedback experiences, the accessibility, the maintenance actions, the repair possibility and so one. This analysis has to lead to a conclusion about the risk taking into account monitoring and maintenance. If the data sheet conclusion is not clear enough, then a more detailed report is launched. The technical document which is needed, is a formal detailed report which summarizes every theoretical knowledge and monitoring data: its objective is to propose a solution for ageing management: this solution can include more inspections or specific research development, or additional maintenance. After a first stage on the 900 MWe units, only two generic ageing management detailed reports have been needed for the civil engineering part: one about reactor building containment, and one about other structures which focuses on concrete inflating reactions. The second stage consists on deriving this generic analysis (ageing mechanism and detailed reports) to every plant where a complete ageing report is required (one report for all equipments and structures of the plant, but specific for each reactor). This ageing management is a continuous process because the

  6. Dental Disease in Aged Horses and Its Management.

    PubMed

    Nicholls, Victoria M; Townsend, Neil

    2016-08-01

    Improved recognition of equine geriatric conditions has resulted in a surge in our aged population with a concurrent escalation of many age-related dental pathologies. Prevention of these disorder is the ultimate aim but early identification and appropriate management can increase an animal's oral comfort and maximise its masticatory ability. There is only a finite amount of tooth available for eruption in the horse and therefore as the teeth become worn and less efficient as a grinding unit, dietary modification becomes a paramount consideration to accommodate this. Geriatric animals have differing requirements for restraint and sedation with treatment of coexisting disorders also an important requirement.

  7. Disease management programs for CKD patients: the potential and pitfalls.

    PubMed

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  8. NRC Research Program on Plant Aging: Listing and summaries of reports issued through September 1993. Revision 4

    SciTech Connect

    Vora, J.P.

    1993-12-01

    The US Nuclear Regulatory Commission is conducting the Nuclear Plant Aging Research (NPAR) Program. This is a comprehensive hardware-oriented engineering research program focused on understanding the aging mechanisms of components and systems in nuclear power plants. The NPAR program also focuses on methods for simulating and monitoring the aging-related degradation of these components and systems. In addition, it provides recommendations for effective maintenance to manage aging and for implementation of the research results in the regulatory process. This document contains a listing and index of reports generated in the NPAR Program that were issued through September 1993 and summaries of those reports. Each summary describes the elements of the research covered in the report and outlines the significant results. For the convenience of the user, the reports are indexed by personal author, corporate author, and subject.

  9. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Continuous airworthiness maintenance... GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1411 Continuous airworthiness maintenance program use by fractional ownership program manager. Fractional ownership...

  10. Development Program for Natural Aging Aluminum Casting Alloys

    SciTech Connect

    Dr. Geoffrey K. Sigworth

    2004-05-14

    A number of 7xx aluminum casting alloys are based on the ternary Al-Zn-Mg system. These alloys age naturally to high strength at room temperature. A high temperature solution and aging treatment is not required. Consequently, these alloys have the potential to deliver properties nearly equivalent to conventional A356-T6 (Al-Si-Mg) castings, with a significant cost saving. An energy savings is also possible. In spite of these advantages, the 7xx casting alloys are seldom used, primarily because of their reputation for poor castibility. This paper describes the results obtained in a DOE-funded research study of these alloys, which is part of the DOE-OIT ''Cast Metals Industries of the Future'' Program. Suggestions for possible commercial use are also given.

  11. Aging degradation of cast stainless steel: status and program

    SciTech Connect

    Chopra, O.K.; Ayrault, G.

    1983-10-01

    A program has been initiated to investigate the significance of in-service embrittlement of cast duplex stainless steels under light-water reactor operating conditions. The existing data are reviewed to determine the critical parameters that control the aging behavior and to define the objectives and scope of the investigation. The test matrices for microstructural studies and mechanical property measurements are presented. The initial experimental effort is focussed on characterizing the microstructure of long-term, low-temperature aged material. Specimens from three heats of cast CF-8 and CF-8M stainless steel aged for up to 70,000 h at 300, 350, and 400/sup 0/C were obtained from George Fisher Ltd., of Switzerland. Initial analyses reveal the formation of three different types of precipitates which are not ..cap alpha..'. An FCC phase, similar to the M/sub 23/C/sub 6/ precipitates, was present in all the long-term aged material. 15 references, 10 figures, 2 tables.

  12. Age Management and Sustainable Careers for the Improvement of the Quality of Ageing at Work.

    PubMed

    Marcaletti, Francesco

    2014-01-01

    Prolonging working careers by increasing the statutory age for retirement has become compulsory in most Western societies in order to tackle the shrinking of the labour force, preserve economic productivity, foster knowledge transfer and reduce the risks of financial imbalances in social security systems. This imperative currently results in working careers that already exceed 40 years and come to an end after the age of 65 (e.g. in Italy). Over the next few decades, both career length and retirement age are expected to rise. Thus, creating more inclusive workplaces by increasing their quality is the precondition of a win-win situation for both employers and employees, regardless of age. A request for support in the development of sustainable careers from both private and public labour organisations has led to innovating the mainstream methodologies and research tools in the field of age management. Based on the key elements of the mainstream "work ability concept" - i.e. health, competencies, motivation and work organisation - the Quality of Ageing at Work questionnaire (QAW-q), developed by a team from the WWELL Research Centre, broadens its perspective by surveying elements bridging intra-organisational dimensions and which affect employees' conditions and external socio-institutional constraints: i.e. work-life balance, economic stability, professional identity and relationships in the workplace. The QAW-q is designed to analyse the influence of the different meanings of age (chronological age, seniority within the company and in the labour market) and correlate them with the different dimensions at individual and organisational levels; all these dimensions are weighted by the effect exerted by the passage of time. The results of the QAW-q survey, taken by employees of both private and public companies, serve as a basis for the implementation of measures addressing all the relevant dimensions of the human resource management cycle.

  13. 14 CFR § 1214.1706 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Program management. § 1214.1706 Section § 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  14. Developing Higher Education Programs in Emergency Management: Ghana's Experience

    ERIC Educational Resources Information Center

    Yakubu, Mariama Bisongu

    2013-01-01

    Ghana is highly vulnerable and threatened by several hazards and has sought ways of minimizing impacts of hazards events over time including demonstrating an interest in developing an emergency management training and an higher education degree program. Yet, as of 2013, the country has not developed a disaster management training program or a…

  15. Exercise Clothing for Children in a Weight-Management Program

    ERIC Educational Resources Information Center

    Carroll, Kate; Alexander, Marina; Spencer, Virginia

    2007-01-01

    This study investigated whether clothing can be perceived as a form of encouragement for success in a weight management exercise program. A small (n = 30) sample of children and parents, enrolled in a weight-management exercise program, responded to a survey instrument that included questions regarding fit and comfort of the clothing children wore…

  16. Export Management Specialist. A Training Program. Instructor's Edition.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This publication provides instructors with materials for an export management specialist (EMS) training program. The objective of the training program is to assist companies in reaching their export goals by educating current and potential managers about the basics of exporting. It provides a foundation for considering international trade and for…

  17. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Federal Highway Administration Multistate Corridor Operations and Management Program AGENCY: Federal... Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice and correction... eligible entities interested in participating in the FHWA Multistate Corridor Operations and...

  18. Pricing specialty carve-outs and disease management programs under managed care.

    PubMed

    LaPensee, K T

    1997-01-01

    The drive toward improved efficiency and effectiveness in health care has spawned disease management programs to address the needs of patients with certain conditions. These programs parallel traditional case management programs in monitoring patients, but disease management differs from case management in early assessment of patient risk, with proactive clinical interventions and educational efforts. The most comprehensive programs include a coordinated delivery system that can be "carved out" from other health care benefits. Pricing disease management can benefit from the analysis of detailed, disease-specific and community-specific data from public or private sources.

  19. The management of hypogonadism in aging male patients.

    PubMed

    Sharma, Vishwamitra; Perros, Petros

    2009-01-01

    This article focuses on the evaluation and management of hypogonadism in aging male patients in the light of recent guidelines. The benefits of treating severe hypogonadism resulting from identifiable pituitary or primary gonadal disease are well established. Milder forms of hypogonadism in the aging male, known as andropause, are common, and constitute an expanding area of clinical interest and research. Several studies indicate that testosterone replacement therapy may produce a wide range of benefits for men with hypogonadism, including improvement in libido, bone density, muscle mass, body composition, mood, and cognition. Currently available data are insufficient to permit a definitive verdict on the balance between risks and benefits of testosterone replacement therapy in aging males.

  20. Sandia National Laboratories, California Chemical Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  1. The (safety-related) heat exchangers aging management guideline for commercial nuclear power plants, and developments since 1994

    SciTech Connect

    Clauss, J.M.

    1998-08-01

    The US Department of Energy (DOE), in cooperation with the Electric Power Research Institute (EPRI) and US nuclear power plant utilities, is preparing a series of aging management guidelines (AMGs) for commodity types of components (e.g., heat exchangers, electrical cable and terminations, pumps). Commodities are included in this series based on their importance to continued nuclear plant operation and license renewal. The AMGs contain a detailed summary of operating history, stressors, aging mechanisms, and various types of maintenance and surveillance practices that can be combined to create an effective aging management program. Each AMG is intended for use by the systems engineers and plant maintenance staff (i.e., an AMG is intended to be a hands-on technical document rather than a licensing document). The heat exchangers AMG, published in June 1994, includes the following information of interest to nondestructive examination (NDE) personnel: aging mechanisms determined to be non-significant for all applications; aging mechanisms determined to be significant for some applications; effective conventional programs for managing aging; and effective unconventional programs for managing aging. Since the AMG on heat exchangers was published four years ago, a brief review has been conducted to identify emerging regulatory issues, if any. The results of this review and lessons learned from the collective set of AMGs are presented.

  2. Home-Based Care Program Reduces Disability And Promotes Aging In Place.

    PubMed

    Szanton, Sarah L; Leff, Bruce; Wolff, Jennifer L; Roberts, Laken; Gitlin, Laura N

    2016-09-01

    The Community Aging in Place, Advancing Better Living for Elders (CAPABLE) program, funded by the Center for Medicare and Medicaid Innovation, aims to reduce the impact of disability among low-income older adults by addressing individual capacities and the home environment. The program, described in this innovation profile, uses an interprofessional team (an occupational therapist, a registered nurse, and a handyman) to help participants achieve goals they set. For example, it provides assistive devices and makes home repairs and modifications that enable participants to navigate their homes more easily and safely. In the period 2012-15, a demonstration project enrolled 281 adults ages sixty-five and older who were dually eligible for Medicare and Medicaid and who had difficulty performing activities of daily living (ADLs). After completing the five-month program, 75 percent of participants had improved their performance of ADLs. Participants had difficulty with an average of 3.9 out of 8.0 ADLs at baseline, compared to 2.0 after five months. Symptoms of depression and the ability to perform instrumental ADLs such as shopping and managing medications also improved. Health systems are testing CAPABLE on a larger scale. The program has the potential to improve older adults' ability to age in place.

  3. Increasing access and support for emergency management higher education programs.

    PubMed

    Cwiak, Carol L

    2014-01-01

    The number of emergency management higher education programs has grown dramatically since 1994 when the FEMA Higher Education Program was created to propagate and support such growth. Data collected annually since 2007 from emergency management higher education programs shows that these programs face some consistent challenges. These challenges were coupled with annual data on program access and support indicators via dimensional analysis to answer the questions: To what extent are the challenges linked to a lack of access or support? If there is linkage, what can be gleaned from these linkages that can help address the challenges through improving access and support? The analysis showed that lack of access to funding and resources, and lack of support from partner organizations, has an impact on emergency management higher education. Discussion of that impact is followed with detailed recommendations that are focused on strengthening both internal and external access and support relationships for emergency management higher education programs.

  4. [The German program for disease management guidelines--implementation with pathways and quality management].

    PubMed

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  5. Final Report Inspection of Aged/Degraded Containments Program.

    SciTech Connect

    Naus, Dan J; Ellingwood, B R; Oland, C Barry

    2005-09-01

    The Inspection of Aged/Degraded Containments Program had primary objectives of (1) understanding the significant factors relating corrosion occurrence, efficacy of inspection, and structural capacity reduction of steel containments and liners of reinforced concrete containments; (2) providing the United States Nuclear Regulatory Commission (USNRC) reviewers a means of establishing current structural capacity margins or estimating future residual structural capacity margins for steel containments, and concrete containments as limited by liner integrity; (3) providing recommendations, as appropriate, on information to be requested of licensees for guidance that could be utilized by USNRC reviewers in assessing the seriousness of reported incidences of containment degradation; and (4) providing technical assistance to the USNRC (as requested) related to concrete technology. Primary program accomplishments have included development of a degradation assessment methodology; reviews of techniques and methods for inspection and repair of containment metallic pressure boundaries; evaluation of high-frequency acoustic imaging, magnetostrictive sensor, electromagnetic acoustic transducer, and multimode guided plate wave technologies for inspection of inaccessible regions of containment metallic pressure boundaries; development of a continuum damage mechanics-based approach for structural deterioration; establishment of a methodology for reliability-based condition assessments of steel containments and liners; and fragility assessments of steel containments with localized corrosion. In addition, data and information assembled under this program has been transferred to the technical community through review meetings and briefings, national and international conference participation, technical committee involvement, and publications of reports and journal articles. Appendix A provides a listing of program reports, papers, and publications; and Appendix B contains a listing of

  6. The Pilot Contracting Activities Program: A Management Review

    DTIC Science & Technology

    1988-12-01

    NAVAL POSTGRADUATE SCHOOL Monterey, California SI STA? RADO , THESIS THE PILOT CONTRACTING ACTIVITIES PROGRAM: A MANAGEMENT REVIEW by Robert John ...Approved for public release; distribution is unlimited The Pilot Contracting Activities Program : A Management Review by Robert John Palmquist...the degree of MASTER OF SCIENCE IN MANAGEMENT from the NAVAL POSTGRADUATE SCHOOL December 1988 Author: ’ Y / " Rober John Palmquist Approved by: g17 A c

  7. NASA's management concept for the Space Shuttle Program.

    NASA Technical Reports Server (NTRS)

    Myers, D. D.

    1972-01-01

    An overview of the Shuttle Program organization and management concepts suggests the necessity of careful measurements of contractor schedules, cost and technical performance, and program modification control to keep both the development and operating cost of the Program at the lowest possible level. Maximum use of the contractors' own management systems and the utilization of new technologies, procedures and materials during space operations are also envisaged as contributors to the reduction of costs per flight to acceptable limits.

  8. Management philosophies as applied to major NASA programs

    NASA Technical Reports Server (NTRS)

    Dannenberg, K. K.

    1974-01-01

    A definition of 'management philosophies' is discussed explaining the position of NASA in the planning and control of space programs and technology. The impact of these philosophies on the Apollo and Saturn 1 programs are described along with the need for the Saturn 5 spacecraft and launch site development. Case studies are included and describe unscheduled events where management decisions were necessary to keep programs on track.

  9. Management Development and Training Program for Colleges and Universities. Program Handbook, May 1978.

    ERIC Educational Resources Information Center

    Higher Education Management Inst., Coconut Grove, FL.

    A Management Development and Training Program has been developed by the Higher Education Management Institute to improve the overall functioning of higher education organizations. The Institute believes management development and training can: add to individuals' knowledge and skills, increase awareness of management processes and systems;…

  10. Anger Management Program Participants Gain Behavioral Changes in Interpersonal Relationships

    ERIC Educational Resources Information Center

    Pish, Suzanne; Clark-Jones, Teresa; Eschbach, Cheryl; Tiret, Holly

    2016-01-01

    RELAX: Alternatives to Anger is an educational anger management program that helps adults understand and manage anger, develop communication skills, manage stress, and make positive behavioral changes in their interpersonal relationships. A sample of 1,168 evaluation surveys were collected from RELAX: Alternatives to Anger participants over 3…

  11. 75 FR 54804 - Safety and Health Management Programs for Mines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ..., Occupational Health and Safety Management Systems; The International Standards Organization's (ISO's) ISO 9001:2008 (E), Quality management systems--Requirements; and The British Standards Institution's (BSI's) BS... Safety and Health Administration 30 CFR Chapter I RIN 1219-AB71 Safety and Health Management Programs...

  12. Iraq Reconstruction: Lessons in Program and Project Management

    DTIC Science & Technology

    2007-03-01

    IRAQ RECONSTRUCTION I 1 • Corps of Engineers Financial Management System (CEFMS) • Primavera P3 (Project Management)—commercial software for planning...updated and analyzed at least monthly. • Sector program managers would be responsible for performing EVM, using the Primavera software, and

  13. Managing environmental information in the age of outsourcing.

    SciTech Connect

    Perkins, S.; Smith, K.; Whorton, M.; Williams, G.

    1999-03-08

    As more data gathering, analysis, and tracking tasks are outsourced the need for multiple contractors and military personnel to input, update, access, store, and track Mormation is becoming critical to efficient functioning and managing of environmental projects and programs at military installations. This paper presents two case studies detailing the way two organizations--the Rocky Mountain Arsenal (RMA) in Colorado, and the 611th Air Support Group (611 ASG) in Alaska--are managing complex data using web-based technology. RMA is involved in one of the largest environmental cleanup programs in the Department of Defense. As such, large volumes of environmental data and documents must be generates stored, and tracked. Often these documents are prepared by multiple contractors and are reviewed by several parties or groups. To manage environmental information and to ensure that it meets compliance requirements more efficiently, RMA has developed an electronic document tracking and distribution system. This system allows access to up-to-date information, including a detailed review of all pertinent regulatory and other requirements at RMA. The dynamic system includes milestones, review deadlines, submission deadlines, and other requirements for managing the environmental program. The 611 ASG manages more than 30 remote installations in Alaska, many of which are operated by contractor personnel. These installations contain hundreds of buildings that are constantly being modified because of exposure to harsh arctic climates; some of them have been determined to be eligible for the National Register of Historic Places. To meet regulatory requirements for cultural resources management as well as engineering requirements for upkeep of buildings, a database was developed to store and analyze building data. The database has a web-based interface that allows anyone with the correct access codes to input new data, modify existing data, or query the database using a number of

  14. Interest in a Twitter-delivered weight loss program among women of childbearing age.

    PubMed

    Waring, Molly E; Schneider, Kristin L; Appelhans, Bradley M; Simas, Tiffany A Moore; Xiao, Rui S; Whited, Matthew C; Busch, Andrew M; Evans, Martinus M; Pagoto, Sherry L

    2016-06-01

    Weight management through the childbearing years is important, yet few women have access to efficacious weight loss programs. Online social network-delivered programs may increase reach and thus impact. The aim of this study was to gauge interest in a Twitter-based weight loss intervention among women of childbearing age and the feasibility of recruitment via Twitter. We recruited English-speaking women aged 18-45 years (N = 63) from Twitter to complete an anonymous online survey including open-ended questions about program advantages and concerns. Forty percent of participants were obese and 83 % were trying to lose weight. Eighty-one percent were interested in a Twitter-delivered weight loss program. Interest was high in all subgroups (62-100 %). Participants (59 %) cited program advantages, including convenience, support/accountability, and privacy. Concerns (59 %) included questions about privacy, support/accountability, engagement, efficacy, and technology barriers. Research is needed to develop and evaluate social media-delivered interventions, and to develop methods for recruiting participants directly from Twitter.

  15. An Overview of the Space Shuttle Orbiter's Aging Aircraft Program

    NASA Technical Reports Server (NTRS)

    Russell, Richard W.

    2007-01-01

    The Space Shuttle Orbiter has well exceeded its original design life of 10 years or 100 missions. The Orbiter Project Office (OPO) has sponsored several activities to address aging vehicle concerns, including a Corrosion Control Review Board (CCRB), a mid-life certification program, and most recently the formation of the Aging Orbiter Working Group (AOWG). The AOWG was chartered in 2004 as a proactive group which provides the OPO oversight for aging issues such as corrosion, non-destructive inspection, non-metallics, wiring and subsystems. The core team consists of mainly representatives from the Materials and Processes Problem Resolution Team (M&P PRT) and Safety and Mission Assurance (S&MA). Subsystem engineers and subject matter experts are called in as required. The AOWG has functioned by forming issues based sub-teams. Examples of completed sub-teams include adhesives, wiring and wing leading edge metallic materials. Current sub-teams include Composite Over-Wrapped Pressure Vessels (COPV), elastomeric materials and mechanisms.

  16. The San Francisco Joint Institutional Transportation Systems Management Program.

    ERIC Educational Resources Information Center

    Fink, Ira; LaPointe, Robert

    1981-01-01

    Transportation systems management (TSM) programs are discussed, particularly the 1977 program of the University of California, San Francisco, which led to traffic reduction and improved vehicle flow. The city's implementation plan for a similar TSM program for 14 educational institutions and hospitals is described. (MLW)

  17. Can weight management programs in worksites reduce the obesity epidemic?

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Worksites can potentially be important locations for weight management programs that contribute to curbing the national obesity epidemic. In published studies, weight loss programs targeting overweight and obese employees have been relatively more effective for weight loss than programs for preventi...

  18. Management Education Program Evaluation: An Empirical Study in Mainland China

    ERIC Educational Resources Information Center

    Sou, Gryphon; Zhou, Pinqiu

    2007-01-01

    Background: With the accession of the PRC to the WTO, Chinese education market is open to the educational service providers of the foreign countries. They are keen to offer MBA Degree programs to the Career Managers in the Mainland. Aims: This research studies program evaluation and so forth the quality assessment of a MBA degree program in the…

  19. Establishing an Agency Records Management Program.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. State Archives and Records Administration.

    The New York State Archives and Records Administration (SARA) provides centralized records management services to State agencies. The State Government Records Management Information Series includes booklets and brochures on many aspects of sound records and information management. This booklet explains the purposes and benefits of records…

  20. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and management... section 205(j) may be used to fund water quality management (WQM) planning activities but may not be...

  1. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and management... section 205(j) may be used to fund water quality management (WQM) planning activities but may not be...

  2. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and management... section 205(j) may be used to fund water quality management (WQM) planning activities but may not be...

  3. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and management... section 205(j) may be used to fund water quality management (WQM) planning activities but may not be...

  4. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and management... section 205(j) may be used to fund water quality management (WQM) planning activities but may not be...

  5. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  6. The Impact of a Telephone-Based Chronic Disease Management Program on Medical Expenditures

    PubMed Central

    Talens, Sheila

    2016-01-01

    Abstract The impact of a payer-provided telephone-based chronic disease management program on medical expenditures was evaluated using claims data from 126,245 members in employer self-ensured health plans (16,224 with a chronic disease in a group enrolled in the self-management program, 13,509 with a chronic disease in a group not participating in the program). A random effects regression model controlling for retrospective risk, age, sex, and diagnosis with a chronic disease was used to determine the impact of program participation on market-adjusted health care expenditures. Further confirmation of results was obtained by an ordinary least squares model comparing market- and risk-adjusted costs to the length of participation in the program. Participation in the program is associated with an average annual savings of $1157.91 per enrolled member in health care expenditures. Savings increase with the length of participation in the program. The results support the use of telephone-based patient self-management of chronic disease as a cost-effective means to reduce health care expenditures in the working-age population. (Population Health Management 2016;19:156–162) PMID:26348843

  7. The Impact of a Telephone-Based Chronic Disease Management Program on Medical Expenditures.

    PubMed

    Avery, George; Cook, David; Talens, Sheila

    2016-06-01

    The impact of a payer-provided telephone-based chronic disease management program on medical expenditures was evaluated using claims data from 126,245 members in employer self-ensured health plans (16,224 with a chronic disease in a group enrolled in the self-management program, 13,509 with a chronic disease in a group not participating in the program). A random effects regression model controlling for retrospective risk, age, sex, and diagnosis with a chronic disease was used to determine the impact of program participation on market-adjusted health care expenditures. Further confirmation of results was obtained by an ordinary least squares model comparing market- and risk-adjusted costs to the length of participation in the program. Participation in the program is associated with an average annual savings of $1157.91 per enrolled member in health care expenditures. Savings increase with the length of participation in the program. The results support the use of telephone-based patient self-management of chronic disease as a cost-effective means to reduce health care expenditures in the working-age population. (Population Health Management 2016;19:156-162).

  8. The Stealth Gerontology [TM] Program: Training Teachers to Infuse Aging and Age-Related Content into Public School Classrooms

    ERIC Educational Resources Information Center

    Pruski, Linda A.; Plaetke, Rosemarie; Cheryl L.; Marshall, Carolyn E.; Lichtenstein, Michael J.

    2004-01-01

    Preparing youngsters for an aging society requires teachers who keep pace with health science research. The Stealth Gerontology [TM] program educates teachers regarding aging-related issues. The design and assessment of the program are reported in this paper. Teachers attended sessions including direct instruction and hands-on participation (e.g.,…

  9. The Stealth Gerontologytm Program[TM]: Training Teachers to Infuse Aging and Age-Related Content into Public School Classrooms

    ERIC Educational Resources Information Center

    Pruski, Linda A.; Plaetke, Rosemarie; Blalock, Cheryl L.; Marshall, Carolyn E.; Lichtenstein, Michael J.

    2004-01-01

    Preparing youngsters for an aging society requires teachers who keep pace with health science research. The Stealth Gerontology[TM] program educates teachers regarding aging-related issues. The design and assessment of the program are reported in this paper. Teachers attended sessions including direct instruction and hands-on participation (e.g.,…

  10. Research Evaluation and Social Demonstration Programs: The Case of the Food and Nutrition Program for the Aged.

    ERIC Educational Resources Information Center

    Ross, Peggy J.

    The Food and Nutrition Program for Aged (FNPA) was established as 1 of 30 research and demonstration programs funded through the provisions of the "Older Americans Act" to promote improved nutrition among aged groups. In the first 3-year phase, the program concentrated on the delivery of nutritional services, and the development and demonstration…

  11. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  12. Managing Mission, Program Goals and Objectives.

    ERIC Educational Resources Information Center

    Bunge, Charles A.; And Others

    1992-01-01

    Four articles about education for library and information studies in the United States discuss philosophies, goals, and objectives of graduate programs; the history and status of undergraduate degree and certification programs; the differentiation between master's, postmaster's, and doctoral programs; and the impact of professional associations on…

  13. Financial management of a hospice program.

    PubMed

    Simione, Robert J; Simione, Kathleen A

    2002-07-01

    Agencies interested in starting hospice programs or maximizing the benefits of existing programs need to implement and maintain accurate and effective internal cost accounting systems. Once established, a cost accounting system provides the administrators of the hospice program with information to prepare budget projections, perform break-even analysis, and develop other reports to assist in making sound business decisions to ensure success.

  14. Laboratory Resources Management in Manufacturing Systems Programs

    ERIC Educational Resources Information Center

    Obi, Samuel C.

    2004-01-01

    Most, if not all, industrial technology (IT) programs have laboratories or workshops. Often equipped with modern equipment, tools, materials, and measurement and test instruments, these facilities constitute a major investment for IT programs. Improper use or over use of program facilities may result in dirty lab equipment, lost or damaged tools,…

  15. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  16. Program Manager: Journal of the Defense Systems Management College, Volume 17, Number 3

    DTIC Science & Technology

    1988-06-01

    Why a proper mixture of Dr. Alan W. Beck, CPCM personality traits and Good change management management skills are requires top-quality profes...Hubek systems acquisition can be management. Dr. Leo Bn increased by applying fun- Mr. Leo Bern-er_% damental management skills A significant part of the...Program Manager are solely those of the authors and are not necessarily endorsed by the Department of Defense or the Defense Systems Management College

  17. Parent Interest in a School-Based, School Nurse-Led Weight Management Program

    ERIC Educational Resources Information Center

    Kubik, Martha Y.; Lee, Jiwoo

    2014-01-01

    Because one in three children is already overweight or obese, school-based interventions targeting secondary obesity prevention merit consideration. This study assessed parent interest in participating in a school-based, school nurse-led weight management program for young school-aged children. A random sample of parents ("n" = 122) of…

  18. Efficient management of cardiovascular risk screening programs

    NASA Technical Reports Server (NTRS)

    Roth, Carol

    1993-01-01

    The Environmental Health Unit, located on-site at the the Goddard Space Flight Center (GSFC), is responsible for the implementation of the Center's Employee Environmental and Occupational Health Program. The Health Unit, Health Physics (HP), and Industrial Hygiene (IH) staffs collaborate to provide quality service to the employees at GSFC. The Health Unit staff identifies, evaluates, and ensures the control of occupational hazards on the Center. In the past, components of the Industrial Hygiene Program have included the Industrial Hygiene Health Hazard Identification Program (IHHIP), the Hearing Conservation Program (HCP), the Hazard Communication Program, and the bi-annual fume hood survey. More recently, the Environmental Health Unit has expanded its services by adding the Ergonomics Program. Various aspects of the Ergonomics Program are discussed.

  19. Integrating end-of-life care with disease management programs: a new role for case managers.

    PubMed

    Lazarus, A

    2001-03-01

    Case managers are crucial to any well-designed disease management program. However, in the progressive course of serious illness, patients, their families, and MCOs need the skills of case manager more than ever to help them through end-of-life care choices. The author describes what case managers will need in their "toolbox" to provide insight to these health plan members.

  20. Preparing health care organizations for successful case management programs.

    PubMed

    Bonvissuto, C A; Kastens, J M; Atwell, S R

    1997-01-01

    This article reports the results of a study of four hospital-based providers in varying stages of implementing case management programs. Three of the providers had most of the necessary elements in place to ensure success, such as a mix of reimbursement sources, an effective and integrated information management system, a full range of clinical services, and continuous quality improvement programs. The authors make several suggestions for key activities that must be pursued by any health care organization seeking to implement a case management program in an era of managed care, tightening reimbursement, and consumer demand for quality care. These include the need to (a) organize essential case management functions under a centralized structure; (b) set realistic, quantifiable targets, and (c) design a communications plan for the program.

  1. The CREp program, a fully parameterizable program to compute exposure ages (3He, 10Be)

    NASA Astrophysics Data System (ADS)

    Martin, L.; Blard, P. H.; Lave, J.; Delunel, R.; Balco, G.

    2015-12-01

    Over the last decades, cosmogenic exposure dating permitted major advances in Earth surface sciences, and particularly in paleoclimatology. Yet, exposure age calculation is a dense procedure. It requires numerous choices of parameterization and the use of an appropriate production rate. Nowadays, Earth surface scientists may either calculate exposure ages on their own or use the available programs. However, these programs do not offer the possibility to include all the most recent advances in Cosmic Ray Exposure (CRE) dating. Notably, they do not propose the most recent production rate datasets and they only offer few possibilities to test the impact of the atmosphere model and the geomagnetic model on the computed ages. We present the CREp program, a Matlab © code that computes CRE ages for 3He and 10Be over the last 2 million years. The CREp program includes the scaling models of Lal-Stone in the "Lal modified" version (Balco et al., 2008; Lal, 1991; Stone, 2000) and the LSD model (Lifton et al., 2014). For any of these models, CREP allows choosing between the ERA-40 atmosphere model (Uppala et al., 2005) and the standard atmosphere (National Oceanic and Atmospheric Administration, 1976). Regarding the geomagnetic database, users can opt for one of the three proposed datasets: Muscheler et al. 2005, GLOPIS-75 (Laj et al. 2004) and the geomagnetic framework proposed in the LSD model (Lifton et al., 2014). They may also import their own geomagnetic database. Importantly, the reference production rate can be chosen among a large variety of possibilities. We made an effort to propose a wide and homogenous calibration database in order to promote the use of local calibration rates: CREp includes all the calibration data published until July 2015 and will be able to access an updated online database including all the newly published production rates. This is crucial for improving the ages accuracy. Users may also choose a global production rate or use their own data

  2. Jamaica: a middle-aged program searches for new horizons.

    PubMed

    1984-01-01

    The advertising and marketing consultant for Jamaica's Commercial Distribution of Contraceptives (JCDC) program, states that the program has reached a state of maturity that has resulted in some inertia. Although still the leader among contraceptive social marketing (CSM) programs in reaching the greatest percentage of its target market, product sales are no longer on an upswing, and retail outlets are not increasing in number. The project is hoping that the introduction of a new thin condom can help, but more than 1 new product may be needed to recapture momentum. The JCDC began in 1974 when Westinghouse Health Systems won a 3 year Agency for International Development (AID) award to create a Jamaican CSM program. Challenges facing the new social marketing project included: oral contraceptives (OCs) were sold only by prescription; most pharmacies were located in urban areas; many consumers associated condoms with prostitution and disease; and retailers were reluctant to carry contraceptives and ignorant of OC side effects. The 1st breakthrough came when Westinghouse obtained government permission to sell a project pill without prescription. After market research, project managers chose the name "Perle" for the JCDC's pill, manufactured in the US by Syntex as Noriday. "Panther" became the project's condom. Prices were set at US17 cents for a Panther 3-pack and 34 cents for a Perle cycle. Advertising messages appeared on television, radio, bus shelters, cinema screens, billboards, and point of purchase displays. By the end of the 1st year's sales, a soft goods manufacturer had asked permission to produce Panther T-shirts and a Reggae composer had popularized songs about the product. Such promotional tactics boosted sales of all contraceptives on the island. About 690,000 Panther condoms and 450,000 other brands were sold in 1976; 195,000 Perle cycles were purchased compared with 135,000 cycles for all other brands combined. By 1977, Westinghouse was reducing

  3. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  4. Behavior Management for School Aged Children with ADHD

    PubMed Central

    Pfiffner, Linda J.; Haack, Lauren M.

    2014-01-01

    Synopsis Behavior management treatments are the most commonly used nonpharmacological approaches for treating ADHD and associated impairments. This review focuses on behavioral parent training interventions for school age children in the home setting and adjunctive treatments developed to extend effects across settings. The underlying theoretical basis and content of these interventions are described. Empirical support includes numerous randomized clinical trials, systematic reviews, and meta-analyses showing positive effects of these interventions on child compliance, ADHD symptoms and impairments, parent-child interactions, parenting and parenting stress. These studies support categorization of behavior management treatment as a well-established, evidence-based treatment for ADHD. Factors for consideration in clinical decision-making and future directions for research are provided. PMID:25220083

  5. Management of aging of nuclear power plant containment structures

    SciTech Connect

    Naus, D.; Oland, C.B.; Ellingwood, B.; Norris, W.E.; Graves, H.L. III

    1998-06-01

    Research addressing aging management of nuclear power plant concrete and steel containment structures is summarized. Accomplishments related to concrete containment structures include formation of a materials` property database; an aging assessment methodology to identify critical structures and degradation factors; guidelines and evaluation criteria for use in condition assessments; and a time-dependent reliability-based methodology for condition assessments and estimations of future performance. Under the steel containments and liners activity, a degradation assessment methodology has been developed, mathematical models that describe time-dependent changes in the containment due to aggressive environmental factors have been identified, and statistical data supporting the use of these models in time-dependent reliability analysis have been summarized.

  6. [Management of age-related macular degeneration. An update].

    PubMed

    García Lozano, Isabel; López García, Santiago; Elosua de Juán, Isabel

    2012-01-01

    Age-related macular degeneration is the leading cause of legal blindness in people over 50 in developed countries. It is a multifactorial disease resulting from the interaction of genetic and environmental factors, and the age is the only worldwide admitted risk factor. The socioeconomic impact of the disease reaches enormous proportions, if we take into account the high cost of the available antiangiogenic therapy, the strict schedule of medical visits that it requires, and the impairment that it gives rise to. The response to treatment and the visual outcomes improve with early management of the retinal lesions, thus the early diagnosis of the disease in its initial phases, based on self-control with an Amsler grid and with regular ophthalmologic assessments, is essential.

  7. Musculoskeletal Disease in Aged Horses and Its Management.

    PubMed

    van Weeren, Paul René; Back, Willem

    2016-08-01

    Musculoskeletal disorders are the most prevalent health problem in aging horses. They are not life threatening, but are painful and an important welfare issue. Chronic joint disease (osteoarthritis) and chronic laminitis are the most prevalent. Treating osteoarthritis in the elderly horse is similar to treating performance horses, but aims at providing a stable situation with optimal comfort. Immediate medical treatment of flare-ups, long-term pain management, and adaptation of exercise and living conditions are the mainstays of treatment. Laminitis in the geriatric horse is related often to pituitary pars intermedia dysfunction, which may be treated with additional pergolide.

  8. Mindfulness-Based Program for Management of Aggression Among Youth: A Follow-up Study

    PubMed Central

    Sharma, Manoj Kumar; Sharma, Mahendra P.; Marimuthu, P.

    2016-01-01

    Background: Youth have shown indulgence in various high-risk behaviors and violent activities. Yoga-based approaches have been used for the management of psychological problems. The present work explores the role of mindfulness-based program in the management of aggression among youth. Materials and Methods: Sociodemographic information schedule, Buss-Perry Aggression Questionnaire, and World Health Organization quality of life were administered on 50 subjects in the age range of 18-25 years at pre- and post-mindfulness-based program level. Results: It revealed the presence of feeling of well-being and ability to relax themselves; changes in score of anger, hostility, physical, and verbal aggression; and enhancement of quality of life in the physical and environment domains at 1 month follow-up. Conclusions: Mindfulness-based program has shown changes in aggression expression/control and implies integration of it in available program for the management of aggression among youth. PMID:27335516

  9. Waste Management Program. Technical progress report, October-December 1982

    SciTech Connect

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  10. General and Vocational Work Experience Education Programs Management System: Career Development Programs.

    ERIC Educational Resources Information Center

    San Mateo Union High School District, CA.

    The General and Vocational Work Experience Education Programs management system is designed to assist the local school teacher/coordinator in the organization and management of the programs. The system defines and describes the accountability line from the Work Experience Education teacher/coordinator, through the Career Planning and Placement…

  11. An Aging Interventions Testing Program: study design and interim report.

    PubMed

    Miller, Richard A; Harrison, David E; Astle, Clinton M; Floyd, Robert A; Flurkey, Kevin; Hensley, Kenneth L; Javors, Martin A; Leeuwenburgh, Christiaan; Nelson, James F; Ongini, Ennio; Nadon, Nancy L; Warner, Huber R; Strong, Randy

    2007-08-01

    The National Institute on Aging's Interventions Testing Program (ITP) has developed a plan to evaluate agents that are considered plausible candidates for delaying rates of aging. Key features include: (i) use of genetically heterogeneous mice (a standardized four-way cross), (ii) replication at three test sites (the Jackson Laboratory, TJL; University of Michigan, UM; and University of Texas, UT), (iii) sufficient statistical power to detect 10% changes in lifespan, (iv) tests for age-dependent changes in T cell subsets and physical activity, and (v) an annual solicitation for collaborators who wish to suggest new interventions for evaluation. Mice in the first cohort were exposed to one of four agents: aspirin, nitroflurbiprofen (NFP), 4-OH-alpha-phenyl-N-tert-butyl nitrone (4-OH-PBN), or nordihydroguiaretic acid (NDGA). An interim analysis was conducted using survival data available on the date at which at least 50% of the male control mice had died at each test site. Survival of control males was significantly higher, at the interim time-point, at UM than at UT or TJL; all three sites had similar survival of control females. Males in the NDGA group had significantly improved survival (P = 0.0004), with significant effects noted at TJL (P < 0.01) and UT (P < 0.04). None of the other agents altered survival, although there was a suggestion (P = 0.07) of a beneficial effect of aspirin in males. More data will be needed to determine if any of these compounds can extend maximal lifespan, but the current data show that NDGA reduces early life mortality risks in genetically heterogeneous mice at multiple test sites.

  12. Training program focuses on developing managers' skills.

    PubMed

    Simpson, D

    1980-01-01

    The movement toward skill development and behavior modification in the training and staff development field is just beginning to affe(t management training in hospitals. The training model described in this article is adaptable to a variety of tasks involving the management of people.

  13. Program and Subcontractor Management. Revision A

    DTIC Science & Technology

    2008-08-11

    17666 Space Systems Risk Management, 2003. EIA 748 -B Earned Value Management Systems, 2007. 3 4 3. Definitions and Abbreviations 3.1...unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FOREWORD I. This standard defines the

  14. Everglades Collaborative Adaptive Management Program Progress

    EPA Science Inventory

    When the Comprehensive Everglades Restoration Plan (CERP) was authorized in 2000, adaptive management (AM) was recognized as a necessary tool to address uncertainty in achieving the broad goals and objectives for restoring a highly managed system. The Everglades covers18,000 squ...

  15. Effective Program Management: A Cornerstone of Malaria Elimination

    PubMed Central

    Gosling, Jonathan; Case, Peter; Tulloch, Jim; Chandramohan, Daniel; Wegbreit, Jennifer; Newby, Gretchen; Gueye, Cara Smith; Koita, Kadiatou; Gosling, Roly

    2015-01-01

    Effective program management is essential for successful elimination of malaria. In this perspective article, evidence surrounding malaria program management is reviewed by management science and malaria experts through a literature search of published and unpublished gray documents and key informant interviews. Program management in a malaria elimination setting differs from that in a malaria control setting in a number of ways, although knowledge and understanding of these distinctions are lacking. Several core features of successful health program management are critical to achieve elimination, including effective leadership and supervision at all levels, sustained political and financial commitment, reliable supply and control of physical resources, effective management of data and information, appropriate incentives, and consistent accountability. Adding to the complexity, the requirements of an elimination program may conflict with those of a control regimen. Thus, an additional challenge is successfully managing program transitions along the continuum from control to elimination to prevention of reintroduction. This article identifies potential solutions to these challenges by exploring managerial approaches that are flexible, relevant, and sustainable in various cultural and health system contexts. PMID:26013372

  16. Effective program management: a cornerstone of malaria elimination.

    PubMed

    Gosling, Jonathan; Case, Peter; Tulloch, Jim; Chandramohan, Daniel; Wegbreit, Jennifer; Newby, Gretchen; Gueye, Cara Smith; Koita, Kadiatou; Gosling, Roly

    2015-07-01

    Effective program management is essential for successful elimination of malaria. In this perspective article, evidence surrounding malaria program management is reviewed by management science and malaria experts through a literature search of published and unpublished gray documents and key informant interviews. Program management in a malaria elimination setting differs from that in a malaria control setting in a number of ways, although knowledge and understanding of these distinctions are lacking. Several core features of successful health program management are critical to achieve elimination, including effective leadership and supervision at all levels, sustained political and financial commitment, reliable supply and control of physical resources, effective management of data and information, appropriate incentives, and consistent accountability. Adding to the complexity, the requirements of an elimination program may conflict with those of a control regimen. Thus, an additional challenge is successfully managing program transitions along the continuum from control to elimination to prevention of reintroduction. This article identifies potential solutions to these challenges by exploring managerial approaches that are flexible, relevant, and sustainable in various cultural and health system contexts.

  17. Early Thymus Involution--Manifestation of an Aging Program or a Program of Development?

    PubMed

    Khalyavkin, A V; Krut'ko, V N

    2015-12-01

    "I see no physical reason why it should not have been possible for life to construct ageless individuals", said Carl von Weizsacker in 1979 at the Conference on DNA. An obvious biological reason for senescence may be the action of a built-in aging program. Many gerontologists believe that early thymic involution is an argument in favor of the existence of such a program. On the other hand, this involution may be a result of the program of development rather than aging. According to the concepts of noninfectious immunology, the immune system of vertebrates is also designed for immune surveillance over initial tumor development and for tissue-specific regulation of cell proliferation both in ontogenesis and during physiological and reparative regeneration of organs and tissues. Natural anti-tissue autoantibodies are the main effectors of such regulation. Therefore, the number of inherited genes of the variable part of immunoglobulin (V-genes) is not less than the number of all proliferative-competent cell types (~100). For the same reason, the maximal rate of growth, which is usually observed in the prepubertal period, coincides with the maximal thymus index and the maximal number of immunoglobulin-secreting cells as well as the minimal force of mortality during ontogeny. Thus, the circa-pubertal beginning of thymic involution is probably caused by the programmed deceleration of the growth rate in ontogeny, and not by the early manifestation of an aging program. This approach allows us to understand the mechanism of the well-known antitumor effect of the regeneration process of the organ homologous to the tumor, and hence we can try to use it in practical oncology.

  18. The Puerto Rican parrot reintroduction program: sustainable management of the aviary population.

    PubMed

    Earnhardt, Joanne; Vélez-Valentín, Jafet; Valentin, Ricardo; Long, Sarah; Lynch, Colleen; Schowe, Kate

    2014-01-01

    The cornerstone of the recovery plan for the critically endangered Puerto Rican parrot (Amazona vitatta) is an actively managed, long-term reintroduction program. One captive population distributed across two aviaries in Puerto Rico is the sole source for release but its ability to persist as a managed resource has not been evaluated since 1989. We conducted an assessment for sustainable management of the aviary population while harvesting for release. To assess demographic rates such as population growth, vital rates, and age/sex structure, we compiled a studbook database on all living, dead, and released individuals in the aviary population. Using an individual-based risk assessment model we applied population specific data based on the management period from 1993 to 2012 to simulate future aviary population dynamics and evaluate future potential production. We modeled four potential management strategies to harvest parrots for proposed releases; these scenarios vary the number of parrots and the life stage. Our simulations revealed that the aviary population can be simultaneously managed for sustainability and harvesting of parrots for release. However, without cautious management, overharvesting can jeopardize sustainability of the aviary population. Our analysis of the aviary breeding program provides a rare opportunity to review progress relative to conservation program objectives after four decades of active management. The successful growth of the aviary population and its ability to serve as a sustainable source for reintroductions supports the 1973 decision to build a breeding program from a small population of 13 parrots.

  19. Hanford Site Groundwater Protection Management Program: Revision 1

    SciTech Connect

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.

  20. The Many Dimensions of Program Management

    NASA Technical Reports Server (NTRS)

    Dean, Edwin B.

    1992-01-01

    For the purposes of this paper, program refers to a collection of activities or projects which must be performed according to a plan or schedule. The Space Exploration Initiative within the National Aeronautics and Space Administration (NASA) is an example. Dimensionality refers to both the various perspectives of a program and to the components within that perspective. It is, thus, appropriate to think of dimensions of dimensionality. For example, one dimension or perspective of a program is the projects which perform the program. Within the project dimension, the individual projects are the components of that dimensionality. The number of projects defines the spatial dimensionality of the project dimension. Thus, each perspective or dimension has a dimensionality of its own. The structure and associated values of all the various perspectives of a program define the program. A project refers to the collection of activities required to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a given system. A project thus effects the life cycle of given system. A project is, thus, the system to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a system. A program, thus, effects the life cycle of the collection of projects required to effect the collection of systems required to implement the program.

  1. 78 FR 24212 - Tribal Management Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Periods: The TMG Program consists of four project types: (1) Feasibility study; (2) planning; (3... desirable or warranted. 2. PLANNING (Maximum Funding/Project Period: $50,000/12 Months) Planning projects... health programs or anticipated PFSA under a Title I contract. Planning projects will specify the...

  2. Marketing the Masters of Executive Management Program

    DTIC Science & Technology

    2007-12-01

    25 A. BUSINESS SCHOOLS COMPARATIVE EVALUATION ......................25 B. PRACTICES IN MARKETING... Business Schools .....................................................................28 Table 2. Curriculum Emphasis (Business Week, 2005... business schools to recruit students and market their MBA programs. An analysis of the MEM program which includes the performance of the MEM to

  3. Managing Large-Scale Online Graduate Programs

    ERIC Educational Resources Information Center

    Singleton, Jacques; Bowser, Audrey; Hux, Annette; Neal, Gwendolyn

    2013-01-01

    As with most states, Arkansas is experiencing substantial growth in the delivery of academic programs and courses by distance learning provided by institutions of higher education. At Arkansas State University faculty have adhered to the need of students and developed a completely online certification and master's program in Educational…

  4. 76 FR 69292 - Aging Management of Stainless Steel Structures and Components in Treated Borated Water

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... COMMISSION Aging Management of Stainless Steel Structures and Components in Treated Borated Water AGENCY... Staff Guidance (LR-ISG), LR- ISG-2011-01, ``Aging Management of Stainless Steel Structures and... Learned (GALL) Report for the aging management of stainless steel structures and components exposed...

  5. Regulatory instrument review: Aging management of LWR cables, containment and basemat, reactor coolant pumps, and motor-operated valves

    SciTech Connect

    Werry, E.V.; Somasundaram, S.

    1995-09-01

    The results of Stage 2 of the Regulatory Instrument Review are presented in this volume. Selected regulatory instruments, such as the Code of Federal Regulations (CFR), US Nuclear Regulatory Commission (NRC), Regulatory Guides, and ASME Codes, were investigated to determine the extent to which these regulations apply aging management to selected safety-related components in nuclear power plants. The Regulatory Instrument Review was funded by the NRC under the Nuclear Plant Aging Research (NPAR) program. Stage 2 of the review focused on four safety-related structures and components; namely, cables, containment and basemat, reactor coolant pumps, and motor-operated valves. The review suggests that the primary-emphasis of the regulatory instruments was on the design, construction, start-up, and operation of a nuclear power plant, and that aging issues were primarily addressed after an aging-related problem was recognized. This Stage 2 review confirms the results of the prior review; (see Regulatory Instrument Review: Management of Aging of LWR Major Safety-Related Components NUREG/CR-5490. The observations indicate that the regulations generally address management of age-related degradation indirectly. Specific age-related degradation phenomena frequently are dealt with in bulletins and notices or through generic issues, letters, etc. The major recommendation of this report, therefore, is that the regulatory instruments should more directly and explicitly address the aging phenomenon and the management of the age-related degradation process.

  6. The Effects of Self-Management Education for School-Age Children on Asthma Morbidity: A Systematic Review

    ERIC Educational Resources Information Center

    Ahmad, Emily; Grimes, Deanna E.

    2011-01-01

    The effects of asthma self-management education for school-age children on number of school days missed, emergency department visits and hospital admissions were evaluated through a systematic review of the published research. A total of 9 studies on asthma education programs that were conducted in schools by school nurses and health educators and…

  7. Procedures to Help Program Offices with Earned Value Management

    EPA Pesticide Factsheets

    EPA’s Earned Value Management (EVM) Procedures describe the Agency methods for collecting and reporting performance information on major IT investments. The EVM Procedures explain how EPA Program Offices are to receive, organize, analyze, and report cost.

  8. Agents Contribute to Statewide Program Designs in Yardwaste Management.

    ERIC Educational Resources Information Center

    May, James H.; And Others

    1994-01-01

    A survey of 125 Virginia extension agents received 90 responses demonstrating their knowledge of yard waste management and composting. Results were used to develop public education programs and pilot projects about composting. (SK)

  9. Notification: Review of the Contract Management Assessment Program

    EPA Pesticide Factsheets

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  10. The Agway Management Development Program: Design and Implementation

    ERIC Educational Resources Information Center

    Barth, Anthony L.; Engfer, Robert T.

    1977-01-01

    Focus is on the Agway (a farm supply and food marketing cooperative) retail store system in this informational case history and how-to approach for designing, developing, and implementing a formal corporate management program. (Editor/TA)

  11. 78 FR 14740 - Disaster Assistance; Fire Management Assistance Grant (FMAG) Program-Deadline Extensions and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ...; Fire Management Assistance Grant (FMAG) Program--Deadline Extensions and Administrative Corrections... its Fire Management Assistance Grant (FMAG) program regulations to lengthen the potential extension...: I. Background The Fire Management Assistance Grant (FMAG) Program is authorized by section 420...

  12. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... training and development programs to promote high performance in its regulatory project management staff... its training program to give regulatory project managers the opportunity to tour...

  13. Navy Family Advocacy Program: The Management and Utilization of Program Information.

    DTIC Science & Technology

    1984-06-01

    AD-Aii5i 867 NAVY FAMILY ADVOCACY PROGRAM: THE MANAGEMENT AND 1/2 UTILIZATION OF PROGRAM I..(U) AMERICAN AiSSOCIATION FOR PROTECTING CHILDREN ...Management and Utilization of Program Information American Association for Protecting Children A division of American HumaneVt NAVY FAMILY ADVOCACY...Allen An’ e-i-on For NTT-, (PA&I DTIC T.H Uinn:ounced Justificaton AMERICAN ASSOCIATION FOR PROTECTING CHILDREN By THE AMERICAN HUMANE ASSOCIATION

  14. NASA Space Flight Program and Project Management Handbook

    NASA Technical Reports Server (NTRS)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  15. Remote sensing in operational range management programs in Western Canada

    NASA Technical Reports Server (NTRS)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  16. The NASA Cryogenic Fluid Management Technology Program Plan

    NASA Technical Reports Server (NTRS)

    Faddoul, James R.; Mcintyre, Stanley D.

    1991-01-01

    The status of the NASA Cryogenic Fluid Management Technology Program Plan is discussed along with specific needs for near future missions. Using the Space Exploration Initiative mission set, cost/benefit projections are then made for development of advanced cryogenic fluid management techniques. Space based and earth based test programs are discussed relative to the technology requirements for liquid storage, supply and transfer and for fluid transfer and advanced instrumentation.

  17. Wastewater management through the ages: a history of mankind.

    PubMed

    Lofrano, Giusy; Brown, Jeanette

    2010-10-15

    Although much has been written about the history of water supply systems, there is a lack of corresponding information on wastewater management. This is surprising since the lack of sanitation affects human development to the same or even greater extent as the lack of clean water. While there may be an added stigma to discussing waste treatment, sanitation is widely perceived as meriting a significant claim on financial and political resources as well on the evolution of mankind. A literature review is presented on the evolution of wastewater management through the ages and its concurrent impact on human health and environment. Hopefully this information will improve the awareness of the past with a view to impacting future policies and technical developments. The review highlights the connection of environmental contamination with the ability to measure it, as well as the ways pollution control has been changed by advances in scientific knowledge. Attention is also drawn to the effects of political and societal events on wastewater management. A sanitation timeline has been constructed pointing out significant developments in the treatment of wastewater and improvements in analytical environmental chemistry. This review has been written in the belief that historical research showing the collective experience and "philosophy of sanitation" can provide inspiration to face future challenges.

  18. Small Business and the Risk Management Program

    EPA Pesticide Factsheets

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  19. EPA'S WATERSHED MANAGEMENT AND MODELING RESEARCH PROGRAM

    EPA Science Inventory

    Watershed management presumes that community groups can best solve many water quality and ecosystem problems at the watershed level rather than at the individual site, receiving waterbody, or discharger level. After assessing and ranking watershed problems, and setting environ...

  20. NOSC Program Managers Handbook. Revision 1

    DTIC Science & Technology

    1988-02-01

    F ..% APM’’. "N Section Systems Engineering-; Sectioniý 9. Contracting; ’Stctionrf0. Financial Managemene -) Sectior, II Human Factors, Section 4...test the waters before taking risks and venturing outside of the planned process and schedule, even though there are demands to change at every step... waste , and abuse." The line management is responsible for the management of the Center’s resources. The PM is dependent upon the support and commitment

  1. Proceedings of the Inaugural Meeting of the International Forum for Reactor Aging Management (IFRAM)

    SciTech Connect

    Bond, Leonard J.; Brenchley, David L.

    2011-09-01

    In almost all countries with nuclear power plants (NPPs), regulatory authorities and the nuclear industry are looking at some form of extended operating periods. To support life extension activities it is necessary to ensure the continued safety and reliability of system, structures, and components, and the component materials. Internationally, a variety of individual national and international activities have been initiated including Plant Life Management through the International Atomic Energy Agency, Electric Power Research Institute’s Long Term Operation program, and various national programs in managing materials degradation and related topics. The U.S. Nuclear Regulatory Commission (NRC) engaged the international community in workshops in 2005-2006 to identify research needs and to collect information in an expert panel report on Proactive Management of Materials Degradation (PMMD), which was reported in NUREG/CR-6923. These results are also available via an Information Tool on the internet at http://pmmd.pnl.gov. This information builds on the extensive compilations known as the GALL Report (Generic Aging Lessons Learned, NUREG-1801, Vols. 1 and 2). Pacific Northwest National Laboratory (PNNL) recently issued a report on the review of various international activities in PMMD (PNNL-17779). There have also been initiatives by Electricite de France, Tokyo Electric Power Company, EPRI, and others to establish a "Materials Aging Institute." Within the materials degradation research community there are also networks and technical meetings focused on some elements of PMMD. In spite of all these efforts, there is currently no forum to bring together these diverse activities and provide coordinated information exchange and prioritization of materials aging management/PMMD topics. It is believed that the International Forum for Reactor Aging Management (IFRAM) would be a good way to achieve this goal and help develop new approaches for ensuring continued safe

  2. UMTRA Project Administrative Files Collection Records Management Program

    SciTech Connect

    Not Available

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

  3. The Westinghouse Waste Isolation Division Management and Supervisor Training Program

    SciTech Connect

    Gilbreath, B.

    1992-04-23

    The Westinghouse Waste Isolation Division (WID) is the management and operating contractor (MOC) for the Department of Energy`s (DOE`s) Waste Isolation Plant (WIPP). Managers and supervisors at DOE facilities such as the WIPP are required to complete extensive training. To meet this requirement, WID created a self-paced, self-study program known as Management and Supervisor Training (MAST). All WID managers and supervisors are required to earn certification through the MAST program. Selected employees are permitted to participate in MAST with prior approval from their manager and the Human Resources Manager. Initial MAST certification requires the completion of 31 modules. MAST participants check out modules and read them when convenient. When they are prepared, participants take module examinations. To receive credit for a given module, participants must score at least 80 percent on the examination. Lessons learned from the development, implementation, and administration are presented in this paper.

  4. Examining the Efficacy of Management for Pennsylvania School Health Programs

    ERIC Educational Resources Information Center

    Jacobi, Wendy J.

    2010-01-01

    In Pennsylvania, certified school nurses were governed by the same educational rules and administrative directives as teachers. School nurses were supervised and evaluated by non-nurse managers who had no knowledge of the scope of school nurse practice. A focus of the study was to examine the efficacy of management for school health programs. The…

  5. Better Choices: Evaluating the Effectiveness of Behavior Management Programs

    ERIC Educational Resources Information Center

    Acuna, Miguel T.

    2011-01-01

    Managing student behavior is often looked upon as a sidebar in teaching. The lack of formal classroom management training in teacher education programs reveals the low importance placed on this skill. As a result, teachers are often very well prepared to instruct, but in terms of effectively understanding the behavior of students--particularly…

  6. Principal's Preparation Program: Managing the Learning Environment Using ELCC Standards

    ERIC Educational Resources Information Center

    Tubbs, J. Eric; Heard, Michael S.; Epps, Adrian

    2011-01-01

    School principals need to be well prepared to manage school facilities assigned to their care. Educational leadership programs can make best use of the Educational Leadership Constituent Council (ELCC) Standards to develop a course of study to address school facility management issues. Every standard has its facility implications that lead to…

  7. 76 FR 42536 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... Federal Highway Administration 23 CFR Part 511 RIN 2125-AF19 Real-Time System Management Information... available and share traffic and travel conditions information via real-time information programs as required... additional comments relating to the costs and benefits of the Real-Time System Management Information...

  8. Psychotropic Medication Management in a Residential Group Care Program

    ERIC Educational Resources Information Center

    Spellman, Douglas F.; Griffith, Annette K.; Huefner, Jonathan C.; Wise, Neil, III; McElderry, Ellen; Leslie, Laurel K.

    2010-01-01

    This article presents a psychotropic medication management approach that is used within a residential care program. The approach is used to assess medications at youths' times of entry and to facilitate decision making during care. Data from a typical case study have indicated that by making medication management decisions slowly, systematically,…

  9. Behavior Management Techniques in Predoctoral and Postdoctoral Pediatric Dentistry Programs.

    ERIC Educational Resources Information Center

    Belanger, Gary K.; Tilliss, Terri S.

    1993-01-01

    A survey determined the extent to which selected pediatric dental behavior management techniques are taught both didactically and clinically in 46 predoctoral and 45 postdoctoral programs. Results and trends are reported within the four categories of sedation, restraint, parental presence, and communications behavior management. (GLR)

  10. OVERVIEW OF THE INTRAMURAL RISK MANAGEMENT RESEARCH PROGRAM

    EPA Science Inventory

    This presentation will provide a summary of the risk management portion of ORD's endocrine disrupting chemicals (EDCs) research program, including its motivation, goals, planning efforts and resulting research areas.

    In an emerging research area like EDCs, risk management ...

  11. Administration of Child Care Programs: Business Management. Student Laboratory Manual.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock. Home Economics Curriculum Center.

    Designed as a laboratory experience guide and workbook, this manual exposes postsecondary students to the general competencies and business management aspects of child care program administration. The four units cover general competencies (functions of management, leadership, and board of directors), regulations and legal concerns, personnel…

  12. Sustainable Supply Chain Management Programs in the 21st Century

    ERIC Educational Resources Information Center

    Neureuther, Brian D.; O'Neill, Kevin

    2011-01-01

    One of the most difficult challenges for an undergraduate supply chain management program at smaller universities is to create an environment of sustainability. Supply chain management is not at the tip of tongue for many graduating high school students and few undergraduate curriculums require a course in the content area. This research addresses…

  13. Risk Management and Litigation Avoidance in Outdoor Recreation Programming.

    ERIC Educational Resources Information Center

    Hanna, Glenda

    This paper reviews aspects of Canadian and U.S. law related to liability and negligence of outdoor programs and suggests strategies for risk management. To prove negligence, an individual injured in an outdoor program must prove that the outdoor leader had a duty of care to the participant, standards of care were breached, actual injury was…

  14. 75 FR 4098 - Section 8 Management Assessment Program (SEMAP) Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Section 8 Management Assessment Program (SEMAP) Certification AGENCY: Office of the... Program (SEMAP) Certification. OMB Approval Number: 2577-0215. Form Numbers: HUD-52648. Description of...

  15. Improving Program Performance through Management Information. A Workbook.

    ERIC Educational Resources Information Center

    Bienia, Nancy

    Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…

  16. Directory of Instructional Programs in Supervision and Management Training.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC. Training Assistance Div.

    This directory, which is designed for the use of training officers in the Washington, D.C. area in prescribing learning programs to meet employee training needs, describes available group and self instructional programs used for the training of supervisors and managers. Each of the 21 courses listed contains the pertinent information necessary to…

  17. A Perspective on a Management Information Systems (MIS) Program Review

    ERIC Educational Resources Information Center

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  18. A Staff Development Program: Behavior Management Issues in Mainstreaming.

    ERIC Educational Resources Information Center

    Zide, Michele Moran; LeBlanc, Patrice

    A training program, for first through eighth grade teachers, was developed to increase their knowledge, skill, and application of behavior management techniques to use with regular and special education students. The program was designed to maximize teacher dialogue in a supportive climate to increase participants' understanding of the complexity…

  19. An Evaluation of CHAMPS: A Classroom Management Program

    ERIC Educational Resources Information Center

    Minnear, Holly J.

    2015-01-01

    This dissertation was designed to examine the impact of Conversation, Help, Activity, Movement, Participation, Success (CHAMPS), a classroom management program in elementary schools in a district in North Carolina. The participants included principals and teachers who attended a 2-day training course and implemented the CHAMPS program at their…

  20. The Michigan Institute for Educational Management Assessment Center Program.

    ERIC Educational Resources Information Center

    Michigan Inst. for Educational Management, Ann Arbor.

    This paper delineates the organizational structure and operational procedures of the Michigan Institute for Educational Management (MIEM) Assessment Center Program for prospective school principals and assistant principals. The program is part of the Assessment Center Project of the National Association of Secondary School Principals (NASSP). The…

  1. Graphic visualization of program performance aids management review

    NASA Technical Reports Server (NTRS)

    Eisenhart, G. N.

    1967-01-01

    Chart technique /PERTREE/ which displays the essential status elements of a PERT system in a vertical flow array, of high graphic quality, enables visual review by management of program performance. Since the display is versatile, it can accommodate any aspect of the program which the presenter wishes to accent.

  2. Psychological and Physiological Effects of a Stress Management Program.

    ERIC Educational Resources Information Center

    Wheeler, Robert J.; Munz, David C.

    Interest in health promotion has resulted in various programs designed to enhance health and prevent disease through changes in lifestyles. The effects of a widely used stress management program were analyzed in two studies. In the first study, office employees in treatment (N=21) and control (N=24) groups were administered the State-Trait Anxiety…

  3. Vaccine cold chain: Part 2. Training personnel and program management.

    PubMed

    Rogers, Bonnie; Dennison, Kim; Adepoju, Nikki; Dowd, Shelia; Uedoi, Kenneth

    2010-09-01

    The Centers for Disease Control and Prevention reports that professionals in clinic settings may not be adequately storing and handling vaccine, leading to insufficient immunity of vaccinated individuals. Part 2 of this article provides information about the importance of adequate personnel training and program management policies and procedures needed to implement and maintain an effective vaccine cold chain program.

  4. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  5. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  6. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  7. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... implement integrity management programs. In addition to a minor correction in terminology, this document...: Integrity Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and...

  8. 2008 Federal Energy Management Program (FEMP) Market Report

    SciTech Connect

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  9. Evaluation of a Training Program in Aging Research for Social Work Faculty

    ERIC Educational Resources Information Center

    Mehrotra, Chandra M.; Townsend, Aloen; Berkman, Barbara

    2013-01-01

    Since 2004, we have offered a postgraduate training program in aging research for social work faculty from across the country. The overarching goal of the program is to expand the pool of social work faculty engaged in aging research. This, in turn, will reinvigorate participants' teaching; prepare them to update aging-related content in the…

  10. Follow-Up Evaluation of a Faculty Training Program in Aging Research

    ERIC Educational Resources Information Center

    Mehrotra, Chandra M.

    2006-01-01

    In collaboration with distinguished scholars and National Institute on Aging (NIA) staff, we designed, implemented, and evaluated a research training program in aging for psychology faculty from 4-year colleges. The goal of the program was to build and sustain a community of college faculty committed to conducting aging research, incorporating…

  11. Taipower`s radioactive waste management program

    SciTech Connect

    Lee, B.C.C.

    1996-09-01

    Nuclear safety and radioactive waste management are the two major concerns of nuclear power in Taiwan. Recognizing that it is an issue imbued with political and social-economic concerns, Taipower has established an integrated nuclear backend management system and its associated financial and mechanism. For LLW, the Orchid Island storage facility will play an important role in bridging the gap between on-site storage and final disposal of LLW. Also, on-site interim storage of spent fuel for 40 years or longer will provide Taipower with ample time and flexibility to adopt the suitable alternative of direct disposal or reprocessing. In other words, by so exercising interim storage option, Taipower will be in a comfortable position to safely and permanently dispose of radwaste without unduly forgoing the opportunities of adopting better technologies or alternatives. Furthermore, Taipower will spare no efforts to communicate with the general public and make her nuclear backend management activities accountable to them.

  12. Management Methods Applied to Lunch Program. What Food Management Companies Can Do for You - 2

    ERIC Educational Resources Information Center

    Davidson, Kenneth R.

    1974-01-01

    In Joliet, Illinois, a food management system based on increased student participation in the school lunch program, was so successful that the controls developed to manage it were adopted as standard operating procedure in overall school system management. (Author/MLF)

  13. Benchmarking processes for managing large international space programs

    NASA Technical Reports Server (NTRS)

    Mandell, Humboldt C., Jr.; Duke, Michael B.

    1993-01-01

    The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

  14. First German Disease Management Program for Breast Cancer

    PubMed Central

    Rupprecht, Christoph

    2005-01-01

    The first disease management program contract for breast cancer in Germany was signed in 2002 between the Association of Regional of Physicians in North-Rhine and the statutory health insurance companies in Rhineland. At the heart of this unique breast cancer disease management program is a patient-centered network of health care professionals. The program's main objectives are: (1) to improve the quality of treatment and post-operative care for breast cancer patients, (2) to provide timely information and consultation empowering the patient to participate in decisionmaking, (3) to improve the interface between inpatient and outpatient care, and (4) to increase the number of breast-conserving surgeries. PMID:17288079

  15. Waste Management Program. Technical progress report, July-December, 1984

    SciTech Connect

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement.

  16. Managing Complex Programs in a Post-LSI Environment

    DTIC Science & Technology

    2008-02-18

    position of the Department of the Army, Department of Defense, or the U.S. Government. MANAGING COMPLEX PROGRAMS IN A POST-LSI ENVIRONMENT BY COLONEL JEFFREY ...GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER R0528 Colonel Jeffrey J. Mockensturm, USA 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7...ANSI Std. Z39.18 USAWC CIVILIAN RESEARCH PAPER MANAGING COMPLEX PROGRAMS IN A POST-LSI ENVIRONMENT by Colonel Jeffrey J. Mockensturm United States

  17. Waste Management Program. Technical progress report, Aporil-June 1983

    SciTech Connect

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  18. Developing Occupation-Based Preventive Programs for Late-Middle-Aged Latino Patients in Safety-Net Health Systems

    PubMed Central

    Carlson, Mike; Martínez, Jenny; Guzmán, Laura; Mahajan, Anish; Clark, Florence

    2015-01-01

    Latino adults between ages 50 and 60 yr are at high risk for developing chronic conditions that can lead to early disability. We conducted a qualitative pilot study with 11 Latinos in this demographic group to develop a foundational schema for the design of health promotion programs that could be implemented by occupational therapy practitioners in primary care settings for this population. One-on-one interviews addressing routines and activities, health management, and health care utilization were conducted, audiotaped, and transcribed. Results of a content analysis of the qualitative data revealed the following six domains of most concern: Weight Management; Disease Management; Mental Health and Well-Being; Personal Finances; Family, Friends, and Community; and Stress Management. A typology of perceived health-actualizing strategies was derived for each domain. This schema can be used by occupational therapy practitioners to inform the development of health-promotion lifestyle interventions designed specifically for late-middle-aged Latinos. PMID:26565102

  19. Thrips management program for horticultural crops

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This article presents a systems approach for managing key thrips pests including western flower thrips (Frankliniella occidentalis) and chilli thrips (Scirtothrips dorsalis) known to cause millions of dollars loss annually. Thrips small size (1-2 mm), thigmotactic behavior, high reproductive rate an...

  20. Land Use Management for Solid Waste Programs

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  1. School District Cash Management. Program Audit.

    ERIC Educational Resources Information Center

    New York State Legislative Commission on Expenditure Review, Albany.

    New York State law permits school districts to invest cash not immediately needed for district operation and also specifies the kinds of investments that may be made in order to ensure the safety and liquidity of public funds. This audit examines cash management and investment practices in New York state's financially independent school districts.…

  2. Thrips management program for plants for planting

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Thrips Management includes sanitation, exclusion, chemical control and biological control. Sanitation. Remove weeds, old plant debris, and growing medium from within and around the greenhouse. Eliminate old stock plants as these are a source of thrips and viruses. Removing old flowers may reduce the...

  3. Management. Program CIP: Business Management: 52.0204

    ERIC Educational Resources Information Center

    Murdock, Ashleigh Barbee, Ed.

    2008-01-01

    Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  4. Assessment of light water reactor accident management programs and experience

    SciTech Connect

    Hammersley, R.J.

    1992-03-01

    The objective of this report is to provide an assessment of the current light water reactor experience regarding accident management programs and associated technology developments. This assessment for light water reactor (LWR) designs is provided as a resource and reference for the development of accident management capabilities for the production reactors at the Savannah River Site. The specific objectives of this assessment are as follows: 1. Perform a review of the NRC, utility, and industry (NUMARC, EPRI) accident management programs and implementation experience. 2. Provide an assessment of the problems and opportunities in developing an accident management program in conjunction or following the Individual Plant Examination process. 3. Review current NRC, utility, and industry technological developments in the areas of computational tools, severe accident predictive tools, diagnostic aids, and severe accident training and simulation.

  5. Capturing Creative Program Management Best Practices

    DTIC Science & Technology

    2013-04-01

    to better inform the researcher (Krathwohl, 1998; Patten , 2009). Snowball sampling entails identifying future participants based on recommendations...and spiral development in DoD programs: Policy issues for Congress. Fort Belvoir, VA: CRS. Patten , M. L. (2009). Understanding research methods: An

  6. THE EFFECTIVENESS OF UNIVERSITY MANAGEMENT DEVELOPMENT PROGRAMS.

    ERIC Educational Resources Information Center

    ANDREWS, KENNETH R.; AND OTHERS

    THE REACTIONS OF 6,000 BUSINESS EXECUTIVES TO FORMAL UNIVERSITY EXECUTIVE DEVELOPMENT PROGRAMS WERE GATHERED BY QUESTIONNAIRE AND A FEW INTERVIEWS. OF THE TOTAL POPULATION, 80 PERCENT REACTED SO FAVORABLY THAT DIFFERENCES IN LENGTH, COSTS, AND QUALITY WERE ALMOST OBSCURED. OF SEVEN ACTIVITIES, THEY RANKED CLASS SESSIONS FIRST, THEN STUDY GROUPS…

  7. The Paradox of Teacher Professional Development Programs for Behaviour Management: Comparing Program Satisfaction alongside Changes in Behaviour Management Practices

    ERIC Educational Resources Information Center

    Giallo, Rebecca; Hayes, Louise

    2007-01-01

    A teacher professional development program using applied behavioural techniques was delivered to primary school teachers. Teachers (N = 78) rated the program highly and reported improved knowledge and skills in managing disruptive student behaviour. Objective measures of teacher (n = 32) pre- and post-workshop data revealed significant changes in…

  8. Aging management of nuclear power plant containments for license renewal

    SciTech Connect

    Liu, W.C.; Kuo, P.T.; Lee, S.S.

    1997-09-01

    In 1990, the Nuclear Management and Resources Council (NUMARC), now the Nuclear Energy Institute (NEI), submitted for NRC review, the industry reports (IRs), NUMARC Report 90-01 and NUMARC Report 90-10, addressing aging management issues associated with PWR containments and BWR containments for license renewal, respectively. In 1996, the Commission amended 10 CFR 50.55a to promulgate requirements for inservice inspection of containment structures. This rule amendment incorporates by reference the 1992 Edition with the 1992 Addenda of Subsections IWE and IWL of the ASME Code addressing the inservice inspection of metal containments/liners and concrete containments, respectively. The purpose of this report is to reconcile the technical information and agreements resulting from the NUMARC IR reviews which are generally described in NUREG-1557 and the inservice inspection requirements of subsections IWE and IWL as promulgated in {section}50.55a for license renewal consideration. This report concludes that Subsections IWE and IWL as endorsed in {section}50.55a are generally consistent with the technical agreements reached during the IR reviews. Specific exceptions are identified and additional evaluations and augmented inspections for renewal are recommended.

  9. Management of women with Gaucher disease in the reproductive age.

    PubMed

    Rosenbaum, Hanna

    2015-02-01

    Gaucher disease (GD) is a lysosomal disorder caused by inherited deficiency of glucocerebrosidase, resulting in the accumulation of glucocerebroside in macrophages, termed "Gaucher cells" (GCs), leading to multiorgan involvement, with hepatosplenomegaly, cytopenias, pulmonary hypertension and osseous complications. The characteristic feature of GD is the organ GCs infiltration compromising their function by inducing local inflammation, infarcts and fibrosis. Enzyme replacement therapy (ERT) available for over two decades improves hematological abnormalities, reverses the visceromegaly, ameliorates bone symptoms and prevents further skeletal complications. GD affects most female events during the reproductive age, particularly, fertility, pregnancy, delivery and puerperium. While pregnancy in GD may exacerbate disease manifestations, the disease may have deleterious effect on female reproductive health milestones. ERT has a beneficial effect on the pregnancy outcome in terms of the risk of spontaneous abortion and GD-related complications, particularly bleeding during delivery and postpartum. Treatment approaches and management aspects of reproductive age events are reviewed hereby, with a focus on the outcome improvement of pregnancies, deliveries and postpartum period in GD patients.

  10. Management of the aging risk factor for Parkinson's disease.

    PubMed

    Phillipson, Oliver T

    2014-04-01

    The aging risk factor for Parkinson's disease is described in terms of specific disease markers including mitochondrial and gene dysfunctions relevant to energy metabolism. This review details evidence for the ability of nutritional agents to manage these aging risk factors. The combination of alpha lipoic acid, acetyl-l-carnitine, coenzyme Q10, and melatonin supports energy metabolism via carbohydrate and fatty acid utilization, assists electron transport and adenosine triphosphate synthesis, counters oxidative and nitrosative stress, and raises defenses against protein misfolding, inflammatory stimuli, iron, and other endogenous or xenobiotic toxins. These effects are supported by gene expression via the antioxidant response element (ARE; Keap/Nrf2 pathway), and by peroxisome proliferator-activated receptor gamma co-activator 1 alpha (PGC-1 alpha), a transcription coactivator, which regulates gene expression for energy metabolism and mitochondrial biogenesis, and maintains the structural integrity of mitochondria. The effectiveness and synergies of the combination against disease risks are discussed in relation to gene action, dopamine cell loss, and the accumulation and spread of pathology via misfolded alpha-synuclein. In addition there are potential synergies to support a neurorestorative role via glial derived neurotrophic factor expression.

  11. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  12. ICPP Waste Management Technology Development Program

    SciTech Connect

    Hogg, G.W.; Olson, A.L.; Knecht, D.A.; Bonkoski, M.J.

    1993-01-01

    As a result of the decision to curtail reprocessing at the Idaho Chemical Processing Plant (ICPP), a Spent fuel and Waste Management Technology Development plan has been implemented to identify acceptable options for disposing of the (1) sodium-bearing liquid radioactive waste, (2) radioactive calcine, and (3) irradiated spent fuel stored at the Idaho National Engineering Laboratory (INEL). The plan was developed jointly by DOE and WINCO.

  13. DoD Pest Management Program

    DTIC Science & Technology

    2008-05-29

    Commonwealths of Puerto Rico, the Northern Marianas, the Virgin Islands; and the Territories of Guam and American Samoa. ENCLOSURE 2 14 DoDI 4150.07, May...minor nuisance pest problems. Quarters and housing occupants are responsible for controlling pests, such as cockroaches , household infesting ants... cockroach and ant baits and/or traps, mouse traps, glue boards, and ready-to-use aerosol pesticides. The office designated to manage the

  14. Environmental Program Management Tools for Federal Facilities

    DTIC Science & Technology

    2010-06-17

    conserve water ; r educe waste ; support susta inable communit ies; and lever age Federa l purchasing power to promote env ironment ally - responsible...Air emissions? Hazardous waste generated? – Recycling services available? – Endangered species in my area? – Where can I find waste storage...innovation and green entrepreneurship by increasing gr een procurem ent (e.g . biobased, water efficient, recycled content, Energy Star, etc.) Su

  15. New master program in management in biophotonics and biotechnologies

    NASA Astrophysics Data System (ADS)

    Meglinski, I. V.; Tuchin, V. V.

    2006-08-01

    We develop new graduate educational highly interdisciplinary program that will be useful for addressing problems in worldwide biotechnologies and related biomedical industries. This Master program called Management in Biophotonics and Biotechnologies provides students with the necessary training, education and problem-solving skills to produce managers who are better equipped to handle the challenges of modern business in modern biotechnologies. Administered jointly by Cranfield University (UK) and Saratov State University, Russia) graduates possess a blend of engineering, biotechnologies, business and interpersonal skills necessary for success in industry. The Master courses combine a regular year program in biophotonics & biotechnologies disciplines with the core requirements of a Master degree. A major advantage of the program is that it will provide skills not currently available to graduates in any other program, and it will give the graduates an extra competitive edge for getting a job then.

  16. [The German program for disease management guidelines. Results and perspectives].

    PubMed

    Ollenschläger, Günter; Kopp, Ina

    2007-05-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) is a joint initiative of the German Medical Association (umbrella organization of the German Chambers of Physicians), the Association of the Scientific Medical Societies (AWMF), and of the National Association of Statutory Health Insurance Physicians (NASHIP). The program aims at developing, implementing and continuously updating best-practice recommendations for countrywide and regional disease management programs in Germany. Since 2003 twelve national guidelines (topics: asthma, chronic obstructive pulmonary disease, HI (Chronic heart failure), CVD (Chronic coronary heart disease) back pain, depression, several aspects of diabetes) have been produced by use of a standardized procedure in accordance with internationally consented methodologies. For countrywide dissemination and implementation the program uses a wide range of specialist journals, continuous medical education and quality management programs. So far, 36 out of 150 national scientific medical associations, four allied health profession organizations, and twelve national consumer organizations have been participating in the DM-CPG Program. Studies to evaluate the program's effects on health-care providers' behavior and patients' outcomes are under way.

  17. Age 26 Cost-Benefit Analysis of the Child-Parent Center Early Education Program

    ERIC Educational Resources Information Center

    Reynolds, Arthur J.; Temple, Judy A.; White, Barry A. B.; Ou, Suh-Ruu; Robertson, Dylan L.

    2011-01-01

    Using data collected up to age 26 in the Chicago Longitudinal Study, this cost-benefit analysis of the Child-Parent Centers (CPC) is the first for a sustained publicly funded early intervention. The program provides services for low-income families beginning at age 3 in 20 school sites. Kindergarten and school-age services are provided up to age 9…

  18. Stockpile Management Program quarterly report. 2. quarter 1998

    SciTech Connect

    1998-11-01

    The objective of this program is to ensure the safety and reliability of the enduring nuclear weapons stockpile by: (1) maintaining robust nuclear facilities that comprise the infrastructure needed to conduct the various laboratory programs; (2) maintaining capabilities and qualified personnel needed to successfully implement the Program and ensure availability of competencies; (3) meeting present and future production and surveillance requirements to support the enduring stockpile and other programmatic deliverables; and (4) capturing and maintaining expertise and competency in the processes and technologies required to build a complete physics package. Summaries of accomplishments are presented for approximately 30 projects managed under this program.

  19. Alternative management and funding options for aeronautics programs, Task 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Research and technology will be at lower program levels with basic military research for aviation decreasing as fewer aircraft programs are initiated and the present new aircraft programs move into the prototype and production status. The key question is can industry take on the management and financing role and meet the criteria and characteristics considered essential for a viable research and technology program. The criteria for evaluating alternative approaches include an examination of the nature of the product to be provided, responsiveness to changing needs, efficiency in terms of costs, ability to provide leadership, and to provide impartial and independent evaluation of approaches, and to provide technological inputs for regulating functions.

  20. Community-Based Summer Learning Programs for School- Age Children: Research-to-Policy Resources

    ERIC Educational Resources Information Center

    Stephens, Samuel A.

    2016-01-01

    Summer learning experiences for school-age children can be provided in a variety of ways and settings, including summer school programs (often remedial), community-based programs (often a continuation of afterschool programs), and home-based programs (in which families are provided with information and resources to encourage reading, often run by…

  1. Results from the Nuclear Plant Aging Research Program: Their use in inspection activities

    SciTech Connect

    Gunther, W.; Taylor, J. )

    1990-09-01

    The US NCR's Nuclear Plant Aging Research (NPAR) Program has determined the susceptibility to aging of components and systems, and the potential for aging to impact plant safety and availability. The NPAR Program also identified methods for detecting and mitigating aging in components. This report describes the NPAR results which can enhance NRC inspection activities. Recommendations are provided for communicating pertinent information to NRC inspectors. These recommendations are based on a detailed assessment of the NRC's Inspection Program, and feedback from resident and regional inspectors as described within. Examples of NPAR report summaries and aging inspection guides for components and systems are included. 13 refs., 3 figs., 4 tabs.

  2. Managing Age Discrimination: An Examination of the Techniques Used when Seeking Employment

    ERIC Educational Resources Information Center

    Berger, Ellie D.

    2009-01-01

    Purpose: This article examines the age-related management techniques used by older workers in their search for employment. Design and Methods: Data are drawn from interviews with individuals aged 45-65 years (N = 30). Results: Findings indicate that participants develop "counteractions" and "concealments" to manage perceived age discrimination.…

  3. Fire-resistant fuel program analysis and program management documentation. Final report, December 1985-January 1986

    SciTech Connect

    Dye, C.A.

    1986-01-31

    There was an urgent need to transition management of the Fire Resistant Fuel (FRF) Program from the Materials Fuels and Lubricants Laboratory (MFLL) to the Logistics Support Directorate (LSD). It is recommended that the LSD develop program management documentation (PMD) that supports a Milestone I review as soon as possible to include the following: System Concept Paper, Concept Formulation Package and a Test Evaluation Master Plan. This report describes programmatic analyses and subsequent programmatic recommendations.

  4. Subjective Experiences of Clients in a Voluntary Money Management Program.

    PubMed

    Serowik, Kristin L; Bellamy, Chyrell D; Rowe, Michael; Rosen, Marc I

    2013-01-01

    A large proportion of people diagnosed with mental illnesses have difficulty managing their money, and therefore many psychiatric treatments involve providing money management assistance. However, little is known about the subjective experience of having a money manager, and extant literature is restricted to people forced to work with a representative payee or conservator. In this study, fifteen people were interviewed about their experience receiving a voluntary money management intervention designed to minimize substance use. Clients emphasized the importance of trusting the money manager, financial mindfulness (an enhanced awareness of the financial transactions in clients' day-to-day lives), agency over their own affairs, and addiction. In contrast to evaluations of people assigned representative payees and/or conservators, there was little mention of feeling coerced. These findings suggest that money management programs can address client concerns by building trust, relating budgeting to clients' day-to-day lives, and encouraging clients' control over their own affairs.

  5. Integrated Risk and Knowledge Management Program -- IRKM-P

    NASA Technical Reports Server (NTRS)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  6. Financial management services in consumer-directed programs.

    PubMed

    Scherzer, Teresa; Wong, Alice; Newcomer, Robert

    2007-01-01

    Shifting from an agency-based model of personal assistance services to consumer direction has important consequences for both recipients and workers. In consumer direction, recipients assume the responsibilities of employing their attendants--for both self-directing their supportive services and being responsible for numerous fiscal responsibilities. Many states have eased these fiscal responsibilities among recipients in publicly financed personal care programs by using Financial Management Services (also known as fiscal intermediaries). This article introduces the major types of Financial Management Services organizations used by Medicaid consumer-directed personal care programs, and examines the extent to which the varied approaches can and do serve the needs of both recipients and workers. Despite the expansion of consumer-directed programs and the accompanying emergence of Financial Management Services, these organizations have not been extensively studied or evaluated. The paper concludes with a discussion of the challenges, opportunities, and policy implications of the current practice; and suggests directions for future research.

  7. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... PROGRAMS 192-MAIL MANAGEMENT Program Level Mail Responsibilities § 102-192.145 Which program levels should have a mail manager? Every program level within a Federal agency that generates a significant...

  8. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... PROGRAMS 192-MAIL MANAGEMENT Program Level Mail Responsibilities § 102-192.145 Which program levels should have a mail manager? Every program level within a Federal agency that generates a significant...

  9. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... PROGRAMS 192-MAIL MANAGEMENT Program Level Mail Responsibilities § 102-192.145 Which program levels should have a mail manager? Every program level within a Federal agency that generates a significant...

  10. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... PROGRAMS 192-MAIL MANAGEMENT Program Level Mail Responsibilities § 102-192.145 Which program levels should have a mail manager? Every program level within a Federal agency that generates a significant...

  11. Heart Failure Update: Chronic Disease Management Programs.

    PubMed

    Fountain, Lorna B

    2016-03-01

    With high mortality and readmission rates among patients with heart failure (HF), multiple disease management models have been and continue to be tested, with mixed results. Early postdischarge care improves outcomes for patients. Telemonitoring also can assist in reducing mortality and HF-related hospitalizations. Office-based team care improves patient outcomes, with important components including rapid access to physicians, partnerships with clinical pharmacists, education, monitoring, and support. Pay-for-performance measures developed for HF, primarily use of angiotensin-converting enzyme inhibitors and beta blockers, also improve patient outcomes, but the influence of adherence to other measures has been minimal. Evaluating comorbid conditions, including diabetes and hypertension, and making drug adjustments for patients with HF to include blood pressure control and use of metformin, when possible, can reduce mortality and morbidity.

  12. Aging

    PubMed Central

    Park, Dong Choon

    2013-01-01

    Aging is initiated based on genetic and environmental factors that operate from the time of birth of organisms. Aging induces physiological phenomena such as reduction of cell counts, deterioration of tissue proteins, tissue atrophy, a decrease of the metabolic rate, reduction of body fluids, and calcium metabolism abnormalities, with final progression onto pathological aging. Despite the efforts from many researchers, the progression and the mechanisms of aging are not clearly understood yet. Therefore, the authors would like to introduce several theories which have gained attentions among the published theories up to date; genetic program theory, wear-and-tear theory, telomere theory, endocrine theory, DNA damage hypothesis, error catastrophe theory, the rate of living theory, mitochondrial theory, and free radical theory. Although there have been many studies that have tried to prevent aging and prolong life, here we introduce a couple of theories which have been proven more or less; food, exercise, and diet restriction. PMID:24653904

  13. An Analysis of the Relationship Between the Professionalism of Defense Acquisition Program Managers and Program Outcomes

    DTIC Science & Technology

    2011-11-30

    Management Studies ........................................................ 34  D.  Human Resource Management ( HRM ) Literature...qualifications (e.g., training, education , experience) among PMs as a contributing factor to unfavorable outcomes such as cost overruns and schedule...e.g., training, education , experience) among PMs as a contributing factor to undesirable acquisition program outcomes such as cost overruns and

  14. Classroom Organization and Management Program (COMP). Submission to the Program Effectiveness Panel.

    ERIC Educational Resources Information Center

    Evertson, Carolyn M.

    A description is given of the Classroom Organization and Management Program, designed to help teachers in grades 1-9 and staff developers improve their overall instructional and behavioral management skills through planning, implementing, and maintaining effective classroom practices. It also seeks to improve student task engagement and reduction…

  15. Managing state energy conservation programs - The Minnesota experience

    NASA Astrophysics Data System (ADS)

    Hirst, E.; Armstrong, J. R.

    1980-11-01

    The development and operation of energy conservation programs in the Minnesota Energy Agency (MEA) are discussed. The MEA has responsibility for voluntary conservation efforts, regulating energy efficient devices, and grant programs to audit and retrofit public buildings. The MEA has developed the plan under which the Minnesota utilities will provide conservation services to residential customers, including an on-site home energy audit. The relation between the Department of Energy (DOE) and state energy offices in implementing programs is considered. The DOE has provided technical assistance to the states through the development of a model audit. Steps are discussed to reduce the burdens imposed on the states by program planning, funding, and management responsibilities, including the consolidation of several existing state conservation programs. Improved policy analysis is suggested to correct inefficiencies in government programs.

  16. Designing and Managing Successful International Joint Development Programs

    DTIC Science & Technology

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Designing and Managing Successful International Joint Development Programs...Navy Contract Management Processes Rene Rendon, Associate Professor, NPS Designing and Managing Successful International Joint Development ...mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 374 - Designing and Managing Successful International Joint Development Programs Andrew Philip

  17. Developing an interdisciplinary community-based sports concussion management program.

    PubMed

    LoGalbo, Anthony; Salinas, Christine M; Dougherty, Michael; Field, Mel

    2014-01-01

    The increasing incidence and associated consequences of sport-related concussion have been at the forefront of public health concerns in recent years, prompting the need for safe and effective management guidelines and availability of appropriately trained healthcare providers. In this report we provide practical and user-friendly information regarding several important factors to consider when developing a sports concussion program, including how to select relevant team members, assess community needs and available resources, provide concussion education, secure and nurture partnerships with athletic programs, implement management strategies that align with current practice standards, and cater to athletes' unique needs in terms of program accessibility. It is hoped that the knowledge shared and proposed recommendations will be beneficial for guiding both newly developing and established concussion programs alike.

  18. 25 CFR 170.503 - How are IRR Program management systems funded?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false How are IRR Program management systems funded? 170.503... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Program Reviews and Management Systems § 170.503 How are IRR Program management systems funded? BIA...

  19. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Are management systems required for the IRR Program? 170... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Program Reviews and Management Systems § 170.502 Are management systems required for the IRR Program?...

  20. 25 CFR 170.503 - How are IRR Program management systems funded?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false How are IRR Program management systems funded? 170.503... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Program Reviews and Management Systems § 170.503 How are IRR Program management systems funded? BIA...