Science.gov

Sample records for aging management program

  1. Structural Aging Program approach to providing an improved basis for aging management of safety-related concrete structures

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.

    1993-11-01

    The Structural Aging (SAG) Program is being conducted at the Oak Ridge National Laboratory (ORNL) for the United States Nuclear Regulatory Commission (USNRC). The SAG Program is addressing the aging management of safety-related concrete structures in nuclear power plants for the purpose of providing improved technical bases for their continued service. The program is organized into four tasks: Program Management, Materials Property Data Base, Structural Component Assessment/Repair Technologies, and Quantitative Methodology for Continued Service Determinations. Objectives and a summary of recent accomplishments under each of these tasks are presented.

  2. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... using Revision 3 of the Nuclear Energy Institute's (NEI) document, NEI 97-06, ``Steam Generator Program... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear...

  3. Generic aging management programs for license renewal of BWR reactor coolant systems components.

    SciTech Connect

    Shah, V.N.; Liu, Y.Y.

    2002-02-15

    The paper reviews the existing generic aging management programs (AMPs) for the reactor coolant system (RCS) components in boiling water reactors (BWRs), including the reactor pressure vessel and internals, the reactor recirculation system, and the connected piping. These programs have been evaluated in the U.S. Nuclear Regulatory Commission (NRC) report, Generic Aging Lessons Learned (GALL), NUREG-1801, for their use in the license renewal process to manage several aging effects, including loss of material, crack initiation and growth, loss of fracture toughness, loss of preload, wall thinning, and cumulative fatigue damage. The program evaluation includes a review of ten attributes (scope of program, preventive actions, parameters monitored/inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmative process, administrative control, and operating experience) for their effectiveness in managing a specific aging effect in a given component(s). The generic programs are based on the ASME Section XI inservice inspection requirements; industry guidelines for inspection and evaluation of aging effects in BWR reactor vessel, internals, and recirculation piping; monitoring and control of BWR water chemistry; and operating experience as reported in the USNRC generic communications and industry reports. The review concludes that all generic AMPs are acceptable for managing aging effects in BWR RCS components during an extended period of operation and do not need further evaluation. However, the plant-specific programs for managing aging in certain RCS components during an extended period of operation do require further evaluation. For some plant-specific AMPs, the GALL report recommends an aging management activity to verify their effectiveness. An example of such an activity is a one-time inspection of Class 1 small-bore piping to ensure that service-induced weld cracking is not occurring in the piping. Several of

  4. Generic Aging Management Programs for License Renewal of BWR Reactor Coolant System Components

    SciTech Connect

    Shah, V.N.; Liu, Y.Y.

    2002-07-01

    The paper reviews the existing generic aging management programs (AMPs) for the reactor coolant system (RCS) components in boiling water reactors (BWRs), including the reactor pressure vessel and internals, the reactor recirculation system, and the connected piping. These programs have been evaluated in the U.S. Nuclear Regulatory Commission (NRC) report, Generic Aging Lessons Learned (GALL), NUREG-1801, for their use in the license renewal process to manage several aging effects, including loss of material, crack initiation and growth, loss of fracture toughness, loss of preload, wall thinning, and cumulative fatigue damage. The program evaluation includes a review of ten attributes (scope of program, preventive actions, parameters monitored/inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmative process, administrative control, and operating experience) for their effectiveness in managing a specific aging effect in a given component(s). The generic programs are based on the ASME Section XI inservice inspection requirements; industry guidelines for inspection and evaluation of aging effects in BWR reactor vessel, internals, and recirculation piping; monitoring and control of BWR water chemistry; and operating experience as reported in the USNRC generic communications and industry reports. The review concludes that all generic AMPs are acceptable for managing aging effects in BWR RCS components during an extended period of operation and do not need further evaluation. However, the plant-specific programs for managing aging in certain RCS components during an extended period of operation do require further evaluation. For some plant-specific AMPs, the GALL report recommends an aging management activity to verify their effectiveness. An example of such an activity is a one-time inspection of Class 1 small-bore piping to ensure that service-induced weld cracking is not occurring in the piping. Several of

  5. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Generators AGENCY: Nuclear Regulatory Commission. ACTION: Request for public comment. SUMMARY: The U.S...), LR-ISG-2011-02, ``Aging Management Program for Steam Generators,'' for public comment. This Draft LR... steam generator aging. The Draft LR-ISG revises the NRC staff's aging management...

  6. Program Management.

    ERIC Educational Resources Information Center

    United Tribes Educational Technical Center, Bismarck, ND.

    The program management guide to Title IV Indian Education projects acquaints participants with program management concepts relative to application forms and encourages the development of management plans and objectives. Sections provide discussions, charts, and examples for the following: regulatory authorities, administrative organizational…

  7. Expanding access to gerontological education via distance learning: the Management of Aging Services Masters Program at UMass Boston.

    PubMed

    Nadash, Pamela; Miller, Edward Alan; Porell, Frank W; Birchander, Ellen; Glickman, Lillian; Burr, Jeffrey A

    2014-01-01

    This article describes the online Management of Aging Services Masters Program at the University of Massachusetts Boston and reports on a recent Program review. The Program has experienced rapid growth, evolving from seven matriculating students in 2003 to 108 in 2012. It has graduated 125 students and boasts a 78% completion rate. The authors describe the Program and report on faculty and student perceptions of performance. The Program demonstrates sound pedagogical practice for online education, incorporating techniques to foster community and encourage students and faculty interaction. Distance learning holds considerable promise for expanding access to gerontological education to reach future aging services professionals.

  8. Role of EPA in Asset Management Research – The Aging Water Infrastructure Research Program

    EPA Science Inventory

    This slide presentation provides an overview of the EPA Office of Research and Development’s Aging Water infrastructure Research Program (AWIRP). The research program origins, goals, products, and plans are described. The research program focuses on four areas: condition asses...

  9. Aging is not programmed

    PubMed Central

    Blagosklonny, Mikhail V

    2013-01-01

    Aging is not and cannot be programmed. Instead, aging is a continuation of developmental growth, driven by genetic pathways such as mTOR. Ironically, this is often misunderstood as a sort of programmed aging. In contrast, aging is a purposeless quasi-program or, figuratively, a shadow of actual programs. “The brightest flame casts the darkest shadow.” -George Martin PMID:24240128

  10. Effective maintenance practices to manage system aging

    NASA Astrophysics Data System (ADS)

    Chockie, Alan; Bjorkelo, Kenneth

    A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence of maintenance programs on addressing the system and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. Four key elements of an effective maintenance program that are important to an aging management were identified: (1) the selection of critical systems and components; (2) the development of an understanding of aging through the collection and analysis of equipment performance information; (3) the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; and (4) the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations.

  11. Managing Management Training Programs in Gerontology.

    ERIC Educational Resources Information Center

    Lowy, Louis; And Others

    A graduate-level management training program in gerontology is presented through a description of a consortium of two universities (Boston University and Brandeis University) and consisting of three types of training (gerontology and aging, sociology and social work, and management techniques). The areas of interest described in these materials…

  12. Structural aging program status report

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.

    1995-04-01

    Research is being conducted at the Oak Ridge National Laboratory (ORNL) under U.S. Nuclear Regulatory Commission (USNRC) sponsorship to address aging management of safety-related concrete structures. Documentation is being prepared to provide the USNRC with potential structural safety issues and acceptance criteria for use in continued service evaluations of nuclear power plants. Program accomplishments have included development of the Structural Materials Information Center containing data and information of the time variation of 144 material properties under the influence of pertinent environmental stressors of aging factors, performance assessments of reinforced concrete structures in several United Kingdom nuclear power facilities, evaluation of European and North American repair practices for concrete, an evaluation of factors affecting the corrosion of metals embedded in concrete, and application of the time-dependent reliability methodology to reinforced concrete flexure and shear structural elements to investigate the role of in-service inspection and repair on their probability of failure.

  13. USEPA ORD Aging Water Infrastructure Research Program

    EPA Science Inventory

    This presentation describes research that is being conducted under the U.S. Environmental Protection Agency’s Aging Water Infrastructure (AWI) Research Program, which will help U.S. water infrastructure to be more effectively and sustainably managed. The AWI research program see...

  14. Space age management for social problems

    NASA Technical Reports Server (NTRS)

    Levine, A. L.

    1973-01-01

    Attempts to apply space age management to social problems were plagued with difficulties. Recent experience in the State of Delaware and in New York City, however, indicate new possibilities. Project management as practiced in NASA was applied with promising results in programs dealing with housing and social services. Such applications are feasible, according to recent research, because project management utilizes social and behavioral approaches, as well as advanced management tools, such as PERT, to achieve results.

  15. Programming for All Ages.

    ERIC Educational Resources Information Center

    Strobell, Adah Parker; And Others

    1985-01-01

    A changing society has resulted in different recreational needs for infants to senior citizens. Programs for pre-school children, six-to-twelve-year olds, teens, adults, and senior adults are suggested. Title of activities include Urban Picnic, Hot Dog Ski Clinics, and Romancing the Song. (MT)

  16. Managing Mentoring Programs.

    ERIC Educational Resources Information Center

    IUME Briefs, 1992

    1992-01-01

    Some programs for helping at-risk youth achieve excellent results, while others do not. One reason for program success can be proper management. Mentoring is a promising strategy for helping at-risk youth. Planners who want to create effective mentoring programs should look at the implementation experiences of other youth programs. Evaluations…

  17. Navigator program risk management

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Padilla, Deborah A.

    2004-01-01

    In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

  18. Program Management Tool

    NASA Technical Reports Server (NTRS)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  19. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  20. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  1. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  2. Intermediate outcomes of chronic disease self-management program offered by members of the Healthy Aging Regional Collaborative in South Florida.

    PubMed

    Melchior, Michael A; Seff, Laura R; Albatineh, Ahmed N; McCoy, H Virginia; Page, Timothy F; Palmer, Richard C

    2014-07-01

    Currently, 80% of adults over the age of 65 have at least one chronic disease. The Chronic Disease Self-management Program (CDSMP) focuses on increasing self-efficacy for managing chronic disease. Few studies have evaluated the effectiveness of CDSMP when offered by multiple agencies, as a collaborative effort, in community-based settings. Seven agencies delivered 108 CDSMP workshops at 81 sites from October 1, 2008, to December 31, 2010. A total of 811 participants were eligible for analysis. Participants completed surveys at baseline and week 6, the end of instruction. Controlling for agency effect and general health at baseline, the general linear model was used to assess the significance of outcomes at 6 weeks. Outcomes showing significant improvement included self-efficacy to manage disease (p = .001), self-efficacy to manage emotions (p = .026), time spent walking (p = .008), and perceived social/role activities limitations (p = .001). Findings showed that CDSMP is an effective program at improving self-efficacy, increasing physical activity, and decreasing limitations.

  3. Programmed cell death in aging

    PubMed Central

    Tower, John

    2015-01-01

    Programmed cell death (PCD) pathways, including apoptosis and regulated necrosis, are required for normal cell turnover and tissue homeostasis. Mis-regulation of PCD is increasingly implicated in aging and aging-related disease. During aging the cell turnover rate declines for several highly-mitotic tissues. Aging-associated disruptions in systemic and inter-cell signaling combined with cell-autonomous damage and mitochondrial malfunction result in increased PCD in some cell types, and decreased PCD in other cell types. Increased PCD during aging is implicated in immune system decline, skeletal muscle wasting (sarcopenia), loss of cells in the heart, and neurodegenerative disease. In contrast, cancer cells and senescent cells are resistant to PCD, enabling them to increase in abundance during aging. PCD pathways limit life span in fungi, but whether PCD pathways normally limit adult metazoan life span is not yet clear. PCD is regulated by a balance of negative and positive factors, including the mitochondria, which are particularly subject to aging-associated malfunction. PMID:25862945

  4. Quality Management Program

    SciTech Connect

    Not Available

    1991-10-01

    According to {section} 35.32, Quality Management Program,'' of 10 CFR Part 35, Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010.

  5. Aging management guideline for commercial nuclear power plants - heat exchangers

    SciTech Connect

    Booker, S.; Lehnert, D.; Daavettila, N.; Palop, E.

    1994-06-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in commercial nuclear power plant heat exchangers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  6. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  7. Arguments against non-programmed aging theories.

    PubMed

    Goldsmith, T C

    2013-09-01

    Until recently, non-programmed theories of biological aging were popular because of the widespread perception that the evolution process could not support the development and retention of programmed aging in mammals. However, newer evolutionary mechanics theories including group selection, kin selection, and evolvability theory support mammal programmed aging, and multiple programmed aging theories have been published based on the new mechanics. Some proponents of non-programmed aging still contend that their non-programmed theories are superior despite the new mechanics concepts. However, as summarized here, programmed theories provide a vastly better fit to empirical evidence and do not suffer from multiple implausible assumptions that are required by non-programmed theories. This issue is important because programmed theories suggest very different mechanisms for the aging process and therefore different mechanisms behind highly age-related diseases and conditions such as cancer, heart disease, and stroke.

  8. Integrated Financial Management Program

    NASA Technical Reports Server (NTRS)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  9. Factors Associated with Successful Completion of the Chronic Disease Self-Management Program among Middle-Aged and Older Asian-American Participants: A National Study

    PubMed Central

    Ahn, SangNam; Smith, Matthew Lee; Cho, Jinmyoung; Jiang, Luohua; Post, Lindsey; Ory, Marcia G.

    2014-01-01

    Asian-Americans are a small but fast-growing population in the United States who are increasingly experiencing multiple chronic diseases. While the evidence-based Chronic Disease Self-Management Program (CDSMP) has been disseminated among various racial and ethnic populations, few studies specifically investigate participants with an Asian background. The study aims to identify characteristics of middle-aged and older Asian-American CDSMP participants (older than 50 years) and investigate factors related to successful workshop completion (i.e., attending 4+ of the 6 sessions) among this population. Data were analyzed from 2,716 middle-aged and older Asian-Americans collected during a 2-year national dissemination of CDSMP. Multilevel logistic regression analyses were conducted to identify individual- and workshop-level covariates related to successful workshop completion. The majority of participants were female, living with others, and living in metro areas. The average age was 71.3 years old (±9.2), and the average number of chronic conditions was 2.0 (±1.5). Successful completion of CDSMP workshops among participants was associated with their number of chronic conditions (OR = 1.10, P = 0.011), living in non-metro areas (OR = 1.77, P = 0.009), attending workshops from area agencies on aging (OR = 1.56, P = 0.018), and attending a workshop with higher completion rates (OR = 1.03, P < 0.001). This study is the first large-scale examination of Asian-American participants enrolled in CDSMP and highlights characteristics related to intervention attendance among this under-studied minority population. Knowing such characteristics is important for serving the growing number of Asian-Americans with chronic conditions. PMID:25964933

  10. Program audit, A management tool

    NASA Technical Reports Server (NTRS)

    Miller, T. J.

    1971-01-01

    Program gives in-depth view of organizational performance at all levels of the management structure, and provides means by which managers can effectively and efficiently evaluate adequacy of management direction, policies, and procedures.

  11. Development of the ageing management database of PUSPATI TRIGA reactor

    NASA Astrophysics Data System (ADS)

    Ramli, Nurhayati; Maskin, Mazleha; Tom, Phongsakorn Prak; Husain, Nurfazila; Farid, Mohd Fairus Abd; Ramli, Shaharum; Adnan, Amirul Syazwan; Abidin, Nurul Husna Zainal

    2016-01-01

    Since its first criticality in 1982, PUSPATI TRIGA Reactor (RTP) has been operated for more than 30 years. As RTP become older, ageing problems have been seen to be the prominent issues. In addressing the ageing issues, an Ageing Management (AgeM) database for managing related ageing matters was systematically developed. This paper presents the development of AgeM database taking into account all RTP major Systems, Structures and Components (SSCs) and ageing mechanism of these SSCs through the system surveillance program.

  12. Influences on Case-Managed Community Aged Care Practice.

    PubMed

    You, Emily Chuanmei; Dunt, David; Doyle, Colleen

    2016-10-01

    Case management has been widely implemented in the community aged care setting. In this study, we aimed to explore influences on case-managed community aged care practice from the perspectives of community aged care case managers. We conducted 33 semistructured interviews with 47 participants. We drew these participants from a list of all case managers working in aged care organizations that provided publicly funded case management program(s)/packages in Victoria, Australia. We used a multilevel framework that included such broad categories of factors as structural, organizational, case manager, client, and practice factors to guide the data analysis. Through thematic analysis, we found that policy change, organizational culture and policies, case managers' professional backgrounds, clients with culturally and linguistically diverse backgrounds, and case management models stood out as key influences on case managers' practice. In the future, researchers can use the multilevel framework to undertake implementation research in similar health contexts. PMID:26318797

  13. Plant maintenance and aging management: Are they the same?

    SciTech Connect

    Lofaro, R.J.

    1995-06-01

    As part of the NRC`s Nuclear Plant Aging Research Program, a number of aging studies were performed on safety-related systems and components which found that, even with current maintenance and monitoring practices in place, a large number of the reported failures are related to aging. This suggests that current practices are not sufficient to completely manage aging degradation, and other factors need to be considered. This paper examines the aging management process and the degree to which maintenance plays a part in it. Component failures and degradation mechanisms identified in aging studies of several different safety systems are summarized and evaluated, then con-elated with the components most frequently failed. This information, along with an analysis of failure causes, is then used to determine the extent to which aging is managed by current maintenance practices. Conclusions and recommendations for proper aging management arc also presented.

  14. Prevention Program Management. Participant Manual.

    ERIC Educational Resources Information Center

    University Research Corp., Bethesda, MD.

    This training package, which centers on effective management and the operation of valid prevention programs, presents a five-day training experience designed to help managers of substance-abuse prevention programs. In this participant manual, the introduction includes a list of program goals and objectives and a summary of the ten individual…

  15. Fluor Hanford Safety Management Program

    SciTech Connect

    WILLIAMS, J.D.

    2003-02-06

    This document summarizes safety management programs used within the scope of the project Hanford Management Contract (PHMC). The document had been developed to meet the format & content requirements of DOE-STD-3009-94, CH-2.

  16. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  17. Tribal Aging Programs: A Basic Guide.

    ERIC Educational Resources Information Center

    National Indian Council on Aging, Albuquerque, NM.

    A national training session for administrators of tribal aging programs held by the National Indian Council on Aging in November 1979 was the basis for the training manual. The seven chapter titles reflect workshop topics with the text of each chapter incorporating material presented in the workshops and examples of model programs on reservations.…

  18. Preparing the Workforce for Healthy Aging Programs: The Skills for Healthy Aging Resources and Programs (SHARP) Model

    ERIC Educational Resources Information Center

    Frank, Janet C.; Altpeter, Mary; Damron-Rodriguez, JoAnn; Driggers, Joann; Lachenmayr, Susan; Manning, Colleen; Martinez, Dana M.; Price, Rachel M.; Robinson, Patricia

    2014-01-01

    Current public health and aging service agency personnel have little training in gerontology, and virtually no training in evidence-based health promotion and disease management programs for older adults. These programs are rapidly becoming the future of our community-based long-term care support system. The purpose of this project was to develop…

  19. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  20. Is programmed aging a cause for optimism?

    PubMed

    Mitteldorf, Josh

    2015-01-01

    Aging is now viewed as programmed under genetic control by a growing minority of evolutionary biologists, and a larger proportion of researchers in gerontology. The hypothesis of programmed aging has been regarded as encouraging for anti-aging science. Some mechanisms of programmed aging may present ready targets for medical interference [mitigation alleviation attenuation], while other kinds of programmed mechanism may yet prove to be refractory. The most promising possibility is that the machinery responsible for maintenance of the vibrant and youthful state of the body is never really lost, but de-commissioned by hormonal signals in the aging body; restoring a youthful signaling environment should then be sufficient to prompt the body to restore itself. But it is also possible that aging may be programmed in a way that does not facilitate anti-aging interventions. We identify two possible cases: In the first, the body is programmed to age via neglect rather than by affirmative self-destruction, so that damage is accumulating that the body is beyond the body's power to repair. In the second, aging is controlled by an epigenetic clock whose workings are so intricate as to be intractable for human mastery in the foreseeable future. There is substantial evidence that first of these is not a likely scenario, but the jury is still out on the second.

  1. Is programmed aging a cause for optimism?

    PubMed

    Mitteldorf, Josh

    2015-01-01

    Aging is now viewed as programmed under genetic control by a growing minority of evolutionary biologists, and a larger proportion of researchers in gerontology. The hypothesis of programmed aging has been regarded as encouraging for anti-aging science. Some mechanisms of programmed aging may present ready targets for medical interference [mitigation alleviation attenuation], while other kinds of programmed mechanism may yet prove to be refractory. The most promising possibility is that the machinery responsible for maintenance of the vibrant and youthful state of the body is never really lost, but de-commissioned by hormonal signals in the aging body; restoring a youthful signaling environment should then be sufficient to prompt the body to restore itself. But it is also possible that aging may be programmed in a way that does not facilitate anti-aging interventions. We identify two possible cases: In the first, the body is programmed to age via neglect rather than by affirmative self-destruction, so that damage is accumulating that the body is beyond the body's power to repair. In the second, aging is controlled by an epigenetic clock whose workings are so intricate as to be intractable for human mastery in the foreseeable future. There is substantial evidence that first of these is not a likely scenario, but the jury is still out on the second. PMID:25902453

  2. Active Aging Promotion: Results from the Vital Aging Program

    PubMed Central

    Caprara, Mariagiovanna; Molina, María Ángeles; Schettini, Rocío; Santacreu, Marta; Orosa, Teresa; Mendoza-Núñez, Víctor Manuel; Rojas, Macarena; Fernández-Ballesteros, Rocío

    2013-01-01

    Active aging is one of the terms in the semantic network of aging well, together with others such as successful, productive, competent aging. All allude to the new paradigm in gerontology, whereby aging is considered from a positive perspective. Most authors in the field agree active aging is a multidimensional concept, embracing health, physical and cognitive fitness, positive affect and control, social relationships and engagement. This paper describes Vital Aging, an individual active aging promotion program implemented through three modalities: Life, Multimedia, and e-Learning. The program was developed on the basis of extensive evidence about individual determinants of active aging. The different versions of Vital Aging are described, and four evaluation studies (both formative and summative) are reported. Formative evaluation reflected participants' satisfaction and expected changes; summative evaluations yielded some quite encouraging results using quasi-experimental designs: those who took part in the programs increased their physical exercise, significantly improved their diet, reported better memory, had better emotional balance, and enjoyed more cultural, intellectual, affective, and social activities than they did before the course, thus increasing their social relationships. These results are discussed in the context of the common literature within the field and, also, taking into account the limitations of the evaluations accomplished. PMID:23476644

  3. Prevention Program Management. Trainer Manual.

    ERIC Educational Resources Information Center

    University Research Corp., Bethesda, MD.

    This training package, which centers on effective management and the operation of valid prevention programs, presents a five-day training experience designed to help managers of substance-abuse prevention programs. In this trainer manual, the introduction includes a list of course goals and objectives, a summary of the ten individual training…

  4. Stress Management. Program Evaluation Handbook.

    ERIC Educational Resources Information Center

    IOX Assessment Associates, Culver City, CA.

    Intended as a resource for individuals wishing to evaluate stress management programs, this handbook, one of a series of seven, provides a collection of measuring devices that can improve the quality of such evaluations. Chapter 1 introduces the handbook's contents and outlines evaluation related issues specific to stress management programs.…

  5. 14 CFR 91.1017 - Amending program manager's management specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Ownership Operations Program Management § 91.1017 Amending program manager's management specifications. (a... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Amending program manager's management... specifications; or (2) The program manager applies for the amendment of any management specifications, and...

  6. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    SciTech Connect

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  7. Asthma management programs in managed care organizations.

    PubMed

    Hartmann, Christine W; Maio, Vittorio; Goldfarb, Neil I; Cobb, Nicole; Nash, David B

    2005-12-01

    The aim of this work was to investigate how managed care organizations (MCOs) currently approach asthma treatment and management and to determine factors affecting asthma outcomes. A Web-based survey was administered to a national sample of 351 medical directors of MCOs to investigate the asthma management program components in their organizations as well as gaps and barriers in the management of patients with asthma. All 134 (38.2%) responding medical directors reported that their organizations monitor asthma patients. Plans use a variety of asthma management activities, including general member education (90%), member education by mail (87%), self-management education (85%), and provider education (82%). Educational resources (89%) and telephone advice nurse (77%) were the most common self-management strategies offered. Among factors impeding the provision of effective asthma care, noncompliance with asthma treatment, the inappropriate use of medications, and the need for multiple medications were cited by virtually all respondents. Health plans rely on an array of strategies to manage asthma patients. Education encouraging patient self-management is a key component of asthma management programs. However, a considerable number of treatment approach barriers are impeding the achievement of proper asthma care. Without innovative approaches to care, it appears that current MCOs' asthma management efforts may not result in substantial improvements in asthma outcomes.

  8. Effective recordkeeping technologies to manage aging

    SciTech Connect

    Dukelow, J.S.; Johnson, A.B. Jr. ); Vora, J.P. )

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms.

  9. Effective recordkeeping technologies to manage aging

    SciTech Connect

    Dukelow, J.S.; Johnson, A.B. Jr.; Vora, J.P.

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission`s Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms.

  10. Evaluation of NRC maintenance team inspection reports for managing aging

    SciTech Connect

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC (Nuclear Regulatory Commission) has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab.

  11. Aging management guideline for commercial nuclear power plants-pumps

    SciTech Connect

    Booker, S.; Katz, D.; Daavettila, N.; Lehnert, D.

    1994-03-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant pumps important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  12. Preparing the workforce for healthy aging programs: the Skills for Healthy Aging Resources and Programs (SHARP) model.

    PubMed

    Frank, Janet C; Altpeter, Mary; Damron-Rodriguez, JoAnn; Driggers, Joann; Lachenmayr, Susan; Manning, Colleen; Martinez, Dana M; Price, Rachel M; Robinson, Patricia

    2014-10-01

    Current public health and aging service agency personnel have little training in gerontology, and virtually no training in evidence-based health promotion and disease management programs for older adults. These programs are rapidly becoming the future of our community-based long-term care support system. The purpose of this project was to develop and test a model community college career technical education program, Skills for Healthy Aging Resources and Programs (SHARP), for undergraduate college students, current personnel in aging service and community organizations, and others interested in retraining. A multidisciplinary cross-sector team from disciplines of public health, sociology, gerontology and nursing developed four competency-based courses that focus on healthy aging, behavior change strategies, program management, an internship, and an option for leader training in the Chronic Disease Self-Management Program. To enhance implementation and fidelity, intensive faculty development training was provided to all instructors and community agency partners. Baseline and postprogram evaluation of competencies for faculty and students was conducted. Process evaluation for both groups focused on satisfaction with the curricula and suggestions for program improvement. SHARP has been piloted five times at two community colleges. Trainees (n = 113) were primarily community college students (n = 108) and current aging service personnel (n = 5). Statistically significant improvements in all competencies were found for both faculty and students. Process evaluation outcomes identified the needed logical and component adaptations to enhance the feasibility of program implementation, dissemination, and student satisfaction. The SHARP program provides a well-tested, evidence-based effective model for addressing workforce preparation in support of healthy aging service program expansion and delivery.

  13. Wildlife Management Assistance Program

    SciTech Connect

    Caudell, M.B.

    1992-08-01

    This report details activities in administering Savannah River Site public lands for wildlife management. Accomplishments in administering hunts, gathering biological data, and in coordinating land use are described.

  14. Communicating Risk to Program Managers

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  15. Environmental Management Science Program Workshop

    SciTech Connect

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  16. Biosolids management: Beneficial use comes of age

    SciTech Connect

    Hodson, C.O.

    1996-12-01

    The most important issues facing the biosolids management industry today are costs, odors and public perception. Of these, public perception has the biggest effect on the industry -- in the way biosolids are generated, used, destroyed, transported and reused. Even in the way they have been named. Officially, sludge is a term affixed to the product that comes out of sewage treatment plants and biosolids is what the processed end product is called. Although it sounds like two different things, the terms are used interchangeably. Still called sludge by some environmental professionals in the water and wastewater industries, biosolids is the official term for sludge being marketed to the public. And apparently it`s working. After years of public misperceptions, biosolids education and public relations programs thrust the organics into the Age of Beneficial Use.

  17. The NASA Risk Management Program

    NASA Technical Reports Server (NTRS)

    Buchbinder, Benjamin

    1990-01-01

    This paper describes the NASA Risk Management Program established by the Headquarters Office of Safety and Mission Quality (MSQ). Current agency policy is outlined, risk management assistance to the field is described, and examples are given of independent risk assessments conducted by SMQ. The motivation for and the structure of the program is placed in the historical context of pre- and post-Challenger environments.

  18. Management of the aging nose.

    PubMed

    Quatela, Vito C; Pearson, James M

    2009-11-01

    As a growing segment of our population, mature patients seeking rhinoplasty for both functional and aesthetic reasons will increasingly be encountered by the facial plastic surgeon. The aging process is characterized by a gradual derotation and deprojection of the nasal tip. This article provides an overview of versatile and proven techniques that may be applied to the majority of aging nose rhinoplasty cases and that have been found to yield predictable and lasting results.

  19. Aircrew team management program

    NASA Technical Reports Server (NTRS)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  20. Illinois' nonpoint source management program

    SciTech Connect

    Not Available

    1994-07-01

    The Illinois Nonpoint Source (NPS) Management Program (Program) describes the statewide authorities that give the Illinois Environmental Protection Agency (IEPA) responsibility to develop and implement this Program. It provides a brief summary of the results of the States' NPS assessment as reported in the Illinois Water Quality Report. Included are eleven sections correlated to NPS pollution sources, or to an area of water pollution protection initiatives. These sections outline goals and objectives to be implemented in Illinois to abate NPS pollution, when possible the sections include a descriptive narrative. Included in the Program, is the process or mechanism which Illinois uses to prioritize and fund future projects. Finally, this Program identifies the federal programs that the IEPA currently reviews for consistency with statewide goals and objectives. Revisions to the Program will be made in accordance with state and federal program changes and as needed.

  1. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  2. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  3. Performance Demonstration Program Management Plan

    SciTech Connect

    Carlsbad Field Office

    2005-07-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by

  4. New data on programmed aging - slow phenoptosis.

    PubMed

    Skulachev, M V; Skulachev, V P

    2014-10-01

    This review summarizes the latest data on biochemistry and physiology of living organisms. These data suggest that aging, i.e. coordinated age-dependent weakening of many vital functions leading to gradual increase in the probability of dying, is not common to all organisms. Some species have been described whose probability of death does not depend on age or even decreases with age, this being accompanied by constant or increasing fertility. In the case of the naked mole rat (a non-aging mammal), a mechanism has been identified that protects this animal from cancer and the most common age-related diseases. The high molecular weight polysaccharide hyaluronan, a linear polymer composed of multiple repeated disaccharide of glucuronic acid and glucosamine, plays the key role in this mechanism. Hyaluronan is accumulated in the intercellular spaces in the organs and tissues of the naked mole rat. This polysaccharide provides early contact inhibition of cell division (anti-cancer effect). In addition, hyaluronan prevents the development of certain types of apoptosis, in particular, those induced by reactive oxygen species (ROS) (geroprotective effect preventing ROS-induced decrease in cellularity in the organs and tissues of aging organisms). Extraordinary longevity of the naked mole rat (over 30 years, which is long for a rodent the size of a mouse) is connected to its eusocial lifestyle, when only the "queen" and its few "husbands" breed, while the huge army of non-breeding "subordinates" provide the "royal family" with protection from predators, food, and construction and maintenance of an underground labyrinth size of a football field. This way of life removes the pressure of natural selection from the "family" and makes aging - the program that is counterproductive for the individual but increases "evolvability" of its offspring - unnecessary. The example of the naked mole rat demonstrates the optional character of the aging program for the organism. Many facts

  5. New data on programmed aging - slow phenoptosis.

    PubMed

    Skulachev, M V; Skulachev, V P

    2014-10-01

    This review summarizes the latest data on biochemistry and physiology of living organisms. These data suggest that aging, i.e. coordinated age-dependent weakening of many vital functions leading to gradual increase in the probability of dying, is not common to all organisms. Some species have been described whose probability of death does not depend on age or even decreases with age, this being accompanied by constant or increasing fertility. In the case of the naked mole rat (a non-aging mammal), a mechanism has been identified that protects this animal from cancer and the most common age-related diseases. The high molecular weight polysaccharide hyaluronan, a linear polymer composed of multiple repeated disaccharide of glucuronic acid and glucosamine, plays the key role in this mechanism. Hyaluronan is accumulated in the intercellular spaces in the organs and tissues of the naked mole rat. This polysaccharide provides early contact inhibition of cell division (anti-cancer effect). In addition, hyaluronan prevents the development of certain types of apoptosis, in particular, those induced by reactive oxygen species (ROS) (geroprotective effect preventing ROS-induced decrease in cellularity in the organs and tissues of aging organisms). Extraordinary longevity of the naked mole rat (over 30 years, which is long for a rodent the size of a mouse) is connected to its eusocial lifestyle, when only the "queen" and its few "husbands" breed, while the huge army of non-breeding "subordinates" provide the "royal family" with protection from predators, food, and construction and maintenance of an underground labyrinth size of a football field. This way of life removes the pressure of natural selection from the "family" and makes aging - the program that is counterproductive for the individual but increases "evolvability" of its offspring - unnecessary. The example of the naked mole rat demonstrates the optional character of the aging program for the organism. Many facts

  6. Structural aging program -- a summary of activities, results, and conclusions

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.R.

    1997-01-01

    Research has been conducted by the Oak Ridge National Laboratory to address aging management of nuclear power plant concrete structures. The purpose was to identify potential structural safety issues and acceptance criteria for use in continued service assessments. Primary program accomplishments have included formulation of a Structural Materials Information Center that contains data and information on the time variation of material properties under the influence of pertinent environmental stressors and aging factors for 144 materials, an aging assessment methodology to identify critical structures and degradation factors that can potentially impact their performance, guidelines and evaluation criteria for use in condition assessments of reinforced concrete structures, and a reliability-based methodology for current condition assessments and estimations of future performance of reinforced concrete nuclear power plant structures. In addition, the Structural Aging Program conducted in-depth evaluations of several nondestructive evaluation and repair-related technologies to develop guidance on their applicability.

  7. Hazardous Materials Management Program Report- 2005.

    SciTech Connect

    Brynildson, Mark E.

    2005-06-01

    The annual program report provides detailed information about all aspects of the SNL/CA Hazardous Materials Management Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  8. Indoor Air Quality Management Program.

    ERIC Educational Resources Information Center

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history, philosophy,…

  9. SEECAL: Program to calculate age-dependent

    SciTech Connect

    Cristy, M.; Eckerman, K.F.

    1993-12-01

    This report describes the computer program SEECAL, which calculates specific effective energies (SEE) to specified target regions for ages newborn, 1 y, 5 y, 10 y, 15 y, a 70-kg adult male, and a 58-kg adult female. The dosimetric methodology is that of the International Commission on Radiological Protection (ICRP) and is generally consistent with the schema of the Medical Internal Radiation Dose committee of the US Society of Nuclear Medicine. Computation of SEEs is necessary in the computation of equivalent dose rate in a target region, for occupational or public exposure to radionuclides taken into the body. Program SEECAL replaces the program SEE that was previously used by the Dosimetry Research Group at Oak Ridge National Laboratory. The program SEE was used in the dosimetric calculations for occupational exposures for ICRP Publication 30 and is limited to adults. SEECAL was used to generate age-dependent SEEs for ICRP Publication 56, Part 1. SEECAL is also incorporated into DCAL, a radiation dose and risk calculational system being developed for the Environmental Protection Agency. Electronic copies of the program and data files and this report are available from the Radiation Shielding Information Center at Oak Ridge National Laboratory.

  10. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  11. Sport Management Graduate Programs: Characteristics of Effectiveness.

    ERIC Educational Resources Information Center

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  12. Eyelid aging: pathophysiology and clinical management.

    PubMed

    Damasceno, Renato Wendell; Avgitidou, Georgia; Belfort, Rubens; Dantas, Paulo Elias Correa; Holbach, Leonard M; Heindl, Ludwig M

    2015-01-01

    Life expectancy is increasing in most countries. With increasing age, many individuals may develop involutional ophthalmic diseases, such as eyelid aging. Dermatochalasis, ptosis, ectropion, and entropion are common disorders in middle-aged and older adults. This review outlines the pathophysiology and clinical management of these involutional eyelid disorders. Recently, a decrease in elastic fibers with ultrastructural abnormalities and an overexpression of elastin-degrading enzymes have been demonstrated in involutional ectropion and entropion. This may be the consequence of local ischemia, inflammation, and/or chronic mechanical stress. Eyelid aging with progressive loss of tone and laxity may affect the ocular surface and adnexal tissues, resulting in different clinical symptoms and signs. Surgical management depends on the appropriate correction of the underlying anatomical defect. PMID:26466237

  13. Age to age: insight into managing a multigenerational staff.

    PubMed

    Stanley, Kay B

    2007-01-01

    Diversity in age and culture-medical practices and healthcare entities mirror the business world in the diversity of culture and age groups among their employees and patients. Differences create challenges, but with understanding and skillful communication, distinctions become opportunities for growth and excellence. The concept we are exploring is that as a generation we are who we are because of what was going on in our world during our formative years. We find that just naming ourselves aspart ofa group is a good starting point. The objective of this article is to identify characteristics of various age groups and to present ways to promote harmony and to maximize performance through practical management techniques. The goal is to better understand ourselves and each other so that our work is more productive and rewarding. PMID:17494481

  14. Age to age: insight into managing a multigenerational staff.

    PubMed

    Stanley, Kay B

    2007-01-01

    Diversity in age and culture-medical practices and healthcare entities mirror the business world in the diversity of culture and age groups among their employees and patients. Differences create challenges, but with understanding and skillful communication, distinctions become opportunities for growth and excellence. The concept we are exploring is that as a generation we are who we are because of what was going on in our world during our formative years. We find that just naming ourselves aspart ofa group is a good starting point. The objective of this article is to identify characteristics of various age groups and to present ways to promote harmony and to maximize performance through practical management techniques. The goal is to better understand ourselves and each other so that our work is more productive and rewarding.

  15. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  16. 78 FR 21980 - Aging Management of Internal Surfaces, Service Level III and Other Coatings, Atmospheric Storage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ...The U.S. Nuclear Regulatory Commission (NRC) requests public comment on the Draft License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2012-02, ``Aging Management of Internal Surfaces, Service Level III and Other Coatings, Atmospheric Storage Tanks, and Corrosion under Insulation.'' The draft LR-ISG proposes to revise NRC staff-recommended aging management programs (AMP) and aging......

  17. Home audit program: management manual

    SciTech Connect

    Not Available

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  18. About the Federal Energy Management Program

    SciTech Connect

    Richard Kidd

    2009-04-23

    Richard Kidd, Program Manager for the Federal Energy Management Program (FEMP), presents a discussion on FEMP direction and its future role, federal funding trends, future financing trends, and Earth Day observations.

  19. Management of a coordinated parts program

    NASA Technical Reports Server (NTRS)

    Krishnan, G. S.

    1997-01-01

    The organization of the management of a parts program is discussed. The organizational structure faced by the parts manager and the advantages and disadvantages of managing a coordinated parts program are analyzed. The reliable operation of an instrument is the key to the success of the mission, together with the management of the parts program. The analysis led to the conclusion that the setting up of the decision support model will aid the parts manager in the decision making and the process control.

  20. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  1. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  2. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  3. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  4. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  5. 75 FR 9017 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  6. 75 FR 52590 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  7. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  8. 76 FR 34124 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  9. 76 FR 11847 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  10. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 402.13 Section 402.13... WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant...

  11. 75 FR 29811 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  12. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  13. 76 FR 58077 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  14. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE General § 800.002 Program management. Program management responsibility...

  15. 76 FR 27743 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  16. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  17. Management of acute neurorehabilitation programs.

    PubMed

    Vogl, Susan M

    2011-06-01

    Outcome management, performance improvement, evidence-based practice, and policy payment mechanisms are critical operational drivers at every level of health care delivery. It is essential that all health care providers involved in patient care have a working knowledge of health care operations, including the policies and reimbursement mechanisms that drive their particular clinical practice. Providing excellent patient care includes understanding health care policies, regulations, and outcomes that have a historical and current impact on health care delivery. Some of these factors include patient access, patient safety, and information measurement and management. Inpatient acute neurorehabilitation programs have standard outcome measures and a unique set of fiscal rules and regulations. This article discusses the most common variables and terms found in program evaluation systems for acute neurorehabilitation programs as well as some of the clinical and regulatory requirements and reimbursement and level-of-care considerations that are critical for neurorehabilitation health care practitioners. The current health care environment requires providers to understand and continually evaluate quality outcomes, patient access, and patient safety, all within the confines of an efficacy-based care delivery system. PMID:22810871

  18. School-Age Ideas and Activities for After School Programs.

    ERIC Educational Resources Information Center

    Haas-Foletta, Karen; Cogley, Michele

    This guide describes activities for school-age children in after-school day care programs. These activities may also be used in other settings. An introductory section discusses program philosophy, room arrangement, multicultural curriculum, program scheduling, summer programs and holiday care, field trips and special programs, age grouping,…

  19. Hospitality Management. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    Florida State Univ., Tallahassee. Center for Instructional Development and Services.

    This program guide is intended for the implementation of a hospitality management program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, describes jobs under the program, and includes a curriculum framework and student performance standards for…

  20. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  1. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2002-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education.

  2. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  3. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  4. Outcomes Assessment in Accredited Health Information Management Programs

    ERIC Educational Resources Information Center

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  5. Behavior management for preschool-aged children.

    PubMed

    Williford, Amanda P; Shelton, Terri L

    2014-10-01

    This article summarizes behavior management strategies for preschool children who are at high risk for attention-deficit/hyperactivity disorder that have found to be effective in improving child behavior. Both parent and teacher training programs are reviewed, as these have been backed by substantial research evidence. In addition, multimodal treatments that include some combination of parent training, teacher training, and social skills training are also reviewed. Interventions emphasize the need for a strong adult-child relationship combined with proactive behavior management strategies to improve child behavior. PMID:25220082

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  7. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  8. Management Training Program in a Discount Store.

    ERIC Educational Resources Information Center

    Sethi, Manmohan Singh

    This study inquired into the objectives of management training programs in two chains of discount stores, and whether those who complete training believe that program objectives have been met. Questionnaire interviews were held with two managers and four trainees from one chain, and with two managers and two trainees from the other. Ten hypotheses…

  9. Waste Management Technician Partnership Program. Final Report.

    ERIC Educational Resources Information Center

    Campbell, Donna

    This final report for Columbia Basin College's waste management technician partnership program outlines 4 objectives: (1) develop at least 4 waste management competency-based curriculum modules; (2) have 50 participants complete at least 1 module; (3) have 100 participants complete a training and/or certification program and 200 managers complete…

  10. 76 FR 74842 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management Committee... Management Committee DATES: The meeting will be held December 13, 2011, from 8:30 a.m.-1:30 p.m....

  11. Evaluating and Selecting Sport Management Undergraduate Programs.

    ERIC Educational Resources Information Center

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  12. Disease management: program design, development, and implementation.

    PubMed

    Harvey, N; DePue, D M

    1997-06-01

    Disease management is an emerging approach to patient management, customer satisfaction, and cost containment that comprises disease modeling; patient segmentation and risk assessment; clinical protocols; and wellness, self-management, and education. Implementing a disease management program poses significant challenges to healthcare organizations. To successfully implement a disease management program, a tightly integrated continuum of care, sophisticated information systems, and disease management support systems must be in place. Strategic partnerships with outside vendors may speed program implementation and provide opportunities to develop risk-sharing relationships. PMID:10167840

  13. Student Loan Programs: Management and Collection.

    ERIC Educational Resources Information Center

    Dorian, James C.; Ward, Diane M.

    This guide to undergraduate and graduate student loan programs focuses primarily on program administration and management in the context of student loan repayment and collection. By incorporating regulatory requirements with practical suggestions on managing student loan programs, the book provides a framework and a guide for those who are…

  14. Program Management Collection. "LINCS" Resource Collection News

    ERIC Educational Resources Information Center

    Literacy Information and Communication System, 2011

    2011-01-01

    This edition of "'LINCS' Resource Collection News" features the Program Management Collection, which covers the topics of Assessment, Learning Disabilities, and Program Improvement. Each month Collections News features one of the three "LINCS" (Literacy Information and Communication System) Resource Collections--Basic Skills, Program Management,…

  15. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  16. Material Management Program Can Attract Local Industry

    ERIC Educational Resources Information Center

    Magad, Eugene L.

    1978-01-01

    Describes the material management certificate and the associate in applied science degree programs at William Rainey Harper College, Palatine, Illinois. Material management functions include purchasing, production control, inventory control, material handling, warehousing, packaging, computer applications, and transportation. (MF)

  17. Adaptive Management Implementation: Glen Canyon Dam Adaptive Management Program Trinity River Restoration Program

    USGS Publications Warehouse

    Wittler, R.; McBain, S.; Stalnaker, C.; Bizier, P.; DeBarry, P.

    2003-01-01

    Two adaptive management programs, the Glen Canyon Dam Adaptive Management Program (GCDAMP) and the Trinity River Restoration Program (TRRP) are examined. In both cases, the focus is on managing the aquatic and riparian systems downstream of a large dam and water supply project. The status of the two programs, lessons learned by the program managers and the Adaptive Environmental Assessment and Management (AEAM) evolution of the TRRP are discussed. The Trinity River illustrates some of the scientific uncertainities that a program faces and the ways the program evolves from concept through implementation.

  18. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  19. Horse Training and Management: Program of Excellence.

    ERIC Educational Resources Information Center

    Lane, Marvin

    This report on Lamar Community College's Horse Training and Management (HTM) program assesses the quality of the educational experience provided by the program, the quality of the faculty and students, institutional financial commitment to the program, contribution of the HTM program to state and local economic development, and external funding…

  20. The FAA aging airplane program plan for transport aircraft

    NASA Technical Reports Server (NTRS)

    Curtis, Dayton; Lewis, Jess

    1992-01-01

    The Federal Aviation Administration (FAA) Aging Airplane Program is focused on five program areas: maintenance, transport airplanes, commuter airplanes, airplane engines, and research. These programs are complementary and concurrent, and have been in effect since 1988. The programs address the aging airplane challenge through different methods, including policies, procedures, and hardware development. Each program is carefully monitored and its progress tracked to ensure that the needs of the FAA, the industry, and the flying public are being met.

  1. Structural health management for aging aircraft

    NASA Astrophysics Data System (ADS)

    Ikegami, Roy; Haugse, Eric D.

    2001-06-01

    An effective structural health management (SHM) system can be a useful tool for making aircraft fleet management decisions ranging from individual aircraft maintenance scheduling and usage restrictions to fleet rotation strategies. This paper discusses the end-user requirements for the elements and architecture of an effective SHM system for application to both military and commercial aging aircraft fleets. The elements discussed include the sensor systems for monitoring and characterizing the health of the structure, data processing methods for interpreting sensor data and converting it into useable information, and automated methods for erroneous data detection, data archiving and information dissemination. Current and past SHM technology development/maturation efforts in these areas at the Boeing Company will be described. An evolutionary technology development strategy is developed in which the technologies needed will be matured, integrated into a vehicle health management system, and benefits established without requiring extensive changes to the end-user's existing operation and maintenance infrastructure. Issues regarding the end-user customer acceptance of SHM systems are discussed and summarized.

  2. Successes and barriers for a youth weight-management program.

    PubMed

    Rice, Jeffrey; Thombs, David; Leach, Rick; Rehm, Richard

    2008-03-01

    A patient recruiting process was developed for a youth weight-management program in a metropolitan area, and the clinical effects of the program on overweight and obese children aged 7 to 17 years old were assessed. During the 12-month effort, 68 overweight children were enrolled. The program included exercise, nutrition coaching, and behavior change counseling. Clinical outcomes were measured. Patient recruiting methods were monitored and included working with physicians and schools and marketing to consumers. Program adherence was 71% attendance, 5% noncompliance, and 5% drop out rates. Clinical outcomes were excellent: 68% of participants lowered their body mass index by an average of 2.5% (mean, 24 weeks). The program was clinically successful, but patient recruitment initiatives were unsuccessful and the program was discontinued. Parents were the largest obstacle to patient recruiting efforts. For children's weight-management programs to be commercially viable, new models of patient recruiting and promotion of parental acceptance are needed.

  3. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  4. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  5. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  6. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  7. Program and Curriculum Trends in Sport Management.

    ERIC Educational Resources Information Center

    Case, Bob; And Others

    A study assessed the present status of professional preparation programs in sport management at 134 four-year colleges and universities throughout the United States. The study survey attempted to find answers to four questions: (1) Has the number of professional preparation programs in sport management increased during the past three years? (2) Is…

  8. Program Evaluation: Two Management-Oriented Samples

    ERIC Educational Resources Information Center

    Alford, Kenneth Ray

    2010-01-01

    Two Management-Oriented Samples details two examples of the management-oriented approach to program evaluation. Kenneth Alford, a doctorate candidate at the University of the Cumberlands, details two separate program evaluations conducted in his school district and seeks to compare and contrast the two evaluations based upon the characteristics of…

  9. Guide for Managers of Adult Education Programs.

    ERIC Educational Resources Information Center

    Hudson River Center for Program Development, Glenmont, NY.

    This document is intended to help adult education program managers throughout New York become oriented to the world of adult education, handle their new responsibilities as program managers, and obtain up-to-date information to assist them in making educational and administrative decisions. The following are among the topics discussed in the…

  10. Hospital program weds case, disease management.

    PubMed

    1997-10-01

    To lower its readmission rates and inpatient length of stay for three high-volume chronic conditions, Memorial Hospital in Colorado Springs, CO, developed a program that combines clinical pathways with a cross-continuum disease management program. Community physicians refer patients to the program. Hospital-based care managers guide patients in the acute setting before handing them off to outpatient case managers, who coordinate the patient's transition to home care. Clinicians at Memorial sold administrators on the "care-case management" approach by arguing that increased inpatient efficiency would offset potential revenue shortfalls due to fewer admissions.

  11. Understanding and Managing Aging of Spent Nuclear Fuel and Facility Components in Wet Storage

    SciTech Connect

    Johnson, A. Burton

    2007-07-01

    Storage of nuclear fuel after it has been discharged from reactors has become the leading spent fuel management option. Many storage facilities are being required to operate longer than originally anticipated. Aging is a term that has emerged to focus attention on the consequences of extended operation on systems, structures, and components that comprise the storage facilities. The key to mitigation of age-related degradation in storage facilities is to implement effective strategies to understand and manage aging of the facility materials. A systematic approach to preclude serious effects of age-related degradation is addressed in this paper, directed principally to smaller facilities (test and research reactors). The first need is to assess the materials that comprise the facility and the environments that they are subject to. Access to historical data on facility design, fabrication, and operation can facilitate assessment of expected materials performance. Methods to assess the current condition of facility materials are summarized in the paper. Each facility needs an aging management plan to define the scope of the management program, involving identification of the materials that need specific actions to manage age-related degradation. For each material identified, one or more aging management programs are developed and become part of the plan Several national and international organizations have invested in development of comprehensive and systematic approaches to aging management. A method developed by the US Nuclear Regulatory Commission is recommended as a concise template to organize measures to effectively manage age-related degradation of storage facility materials, including the scope of inspection, surveillance, and maintenance that is needed to assure successful operation of the facility over its required life. Important to effective aging management is a staff that is alert for evidence of materials degradation and committed to carry out the aging

  12. The Xyrem risk management program.

    PubMed

    Fuller, David E; Hornfeldt, Carl S; Kelloway, Judy S; Stahl, Pamela J; Anderson, Todd F

    2004-01-01

    Sodium oxybate, also known as gamma-hydroxybutyric acid (GHB), was discovered in 1960 and has been described both as a therapeutic agent with high medical value and, more recently, a substance of abuse. The naturally occurring form of this drug is found in various body tissues but has been studied most extensively in the CNS where its possible function as a neurotransmitter continues to be studied. Sodium oxybate has been approved in different countries for such varied uses as general anaesthesia, the treatment of alcohol withdrawal and addiction, and, most recently, cataplexy associated with narcolepsy. During the 1980s, easy access to GHB-containing products led to various unapproved uses, including weight loss, bodybuilding and the treatment of sleeplessness, sometimes with serious long-term effects. The availability of these unapproved and unregulated forms of the drug led to GHB and its analogues being popularised as substances of abuse and subsequent notoriety as agents used in drug-facilitated sexual assault, or 'date rape', eventually leading to the prohibition of GHB sales in the US. Legal efforts to control the sale and distribution of GHB and its analogues nearly prevented the clinical development of sodium oxybate for narcolepsy in the US. However, following extensive discussions with a variety of interested parties, a satisfactory solution was devised, including legislative action and the development of the Xyrem Risk Management Program. Amendments to the US Controlled Substances Act made GHB a schedule I drug, but also contained provisions that allow US FDA-approved products to be placed under schedule III. This unique, bifurcated schedule for sodium oxybate/GHB allowed the clinical development of sodium oxybate to proceed and, in July 2002, it was approved by the FDA as an orphan drug for the treatment of cataplexy in patients with narcolepsy as Xyrem(sodium oxybate) oral solution. To promote the safe use of sodium oxybate, as well as alleviate

  13. The Xyrem risk management program.

    PubMed

    Fuller, David E; Hornfeldt, Carl S; Kelloway, Judy S; Stahl, Pamela J; Anderson, Todd F

    2004-01-01

    Sodium oxybate, also known as gamma-hydroxybutyric acid (GHB), was discovered in 1960 and has been described both as a therapeutic agent with high medical value and, more recently, a substance of abuse. The naturally occurring form of this drug is found in various body tissues but has been studied most extensively in the CNS where its possible function as a neurotransmitter continues to be studied. Sodium oxybate has been approved in different countries for such varied uses as general anaesthesia, the treatment of alcohol withdrawal and addiction, and, most recently, cataplexy associated with narcolepsy. During the 1980s, easy access to GHB-containing products led to various unapproved uses, including weight loss, bodybuilding and the treatment of sleeplessness, sometimes with serious long-term effects. The availability of these unapproved and unregulated forms of the drug led to GHB and its analogues being popularised as substances of abuse and subsequent notoriety as agents used in drug-facilitated sexual assault, or 'date rape', eventually leading to the prohibition of GHB sales in the US. Legal efforts to control the sale and distribution of GHB and its analogues nearly prevented the clinical development of sodium oxybate for narcolepsy in the US. However, following extensive discussions with a variety of interested parties, a satisfactory solution was devised, including legislative action and the development of the Xyrem Risk Management Program. Amendments to the US Controlled Substances Act made GHB a schedule I drug, but also contained provisions that allow US FDA-approved products to be placed under schedule III. This unique, bifurcated schedule for sodium oxybate/GHB allowed the clinical development of sodium oxybate to proceed and, in July 2002, it was approved by the FDA as an orphan drug for the treatment of cataplexy in patients with narcolepsy as Xyrem(sodium oxybate) oral solution. To promote the safe use of sodium oxybate, as well as alleviate

  14. Do employee health management programs work?

    PubMed

    Serxner, Seth; Gold, Daniel; Meraz, Angela; Gray, Ann

    2009-01-01

    Current peer review literature clearly documents the economic return and Return-on-Investment (ROI) for employee health management (EHM) programs. These EHM programs are defined as: health promotion, self-care, disease management, and case management programs. The evaluation literature for the sub-set of health promotion and disease management programs is examined in this article for specific evidence of the level of economic return in medical benefit cost reduction or avoidance. The article identifies the methodological challenges associated with determination of economic return for EHM programs and summarizes the findings from 23 articles that included 120 peer review study results. The article identifies the average ROI and percent health plan cost impact to be expected for both types of EHM programs, the expected time period for its occurrence, and caveats related to its measurement.

  15. School-Age Child Care: Innovative Public School Programs.

    ERIC Educational Resources Information Center

    ERS Spectrum, 1992

    1992-01-01

    Innovative school-age day care programs include Tennessee's Extended School Program; Hawaii's After-School Plus program; San Antonio's Kid's Involvement Network (offering middle school supervision); Aurora, Colorado's state-licensed Year-Round School Recreation Plan; and Pomona, California's Child Development Program. These public school programs…

  16. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  17. Cost reduction programs for capital asset management.

    PubMed

    Bluemke, D H

    1993-01-01

    Mr. Bluemke argues that healthcare institutions should include capital asset management in their CQI/TQM programs to gain the best cost reduction from those programs. He cites a recent survey of hospital executives that asked which of the potential benefits of capital asset management programs would have the most value for their institutions. Mr. Bluemke believes that cost reduction can be better achieved by hospitals finding more efficient ways of doing business than through government intervention.

  18. Labor/Management Workplace Education Programs.

    ERIC Educational Resources Information Center

    Chernow, Harneen

    This report includes two sections: (1) an overview of the issues involved in joint labor/management workplace education programs and (2) a description of such a program partnering two union locals, nine hospitals, and Bunker Hill Community College to implement a workplace-based career ladder program. The first section explains that unions and…

  19. Economic evaluation of an internet-based weight management program

    Technology Transfer Automated Retrieval System (TEKTRAN)

    To determine whether a behavioral Internet treatment (BIT) program for weight management is a viable, cost-effective option compared with usual care (UC) in a diverse sample of overweight (average body mass index = 29 kg/m2), healthy adults (mean age = 34 years) serving in the US Air Force. Two-grou...

  20. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  1. A 'Wild' Idea: Adventure Programs Help Seniors 'Age Successfully'.

    ERIC Educational Resources Information Center

    Sugerman, Deborah A.

    1989-01-01

    Suggests techniques for camp directors to help older adults enjoy adventure camping. Discusses sociological and psychological changes accompanying aging. Emphasizes outdoor group activities as ways of helping older adults adjust to aging. Offers tips for adventure program development, staff development, and program evaluation. (TES)

  2. Air Age Education. Aviation Career Awareness Program.

    ERIC Educational Resources Information Center

    Petrie, Edwin T.

    Described is a program designed to help introduce the broad scope of occupational careers available with general aviation. The program is designed to aid the teacher in presenting the basic principles of flight, essential facts about general aviation as well as its occupational opportunities. It replaces previous elementary student materials, and…

  3. The NBS data management technology program

    NASA Technical Reports Server (NTRS)

    Wood, H. M.

    1984-01-01

    The National Bureau of Standards (NBS) Data Management Technology Program is discussed. The NBS Data Management Technology Program addresses major problems encountered during the following stages of an application's lifetime: requirements analysis and data base design, system selection and implementation, operations management and conversion. Products developed include standard software specifications, guides to best practice, standard data elements and representations, and reports documenting the experiences of other organizations as they attempt to improve the management of their computing resources. Data base Laboratory facilities are maintained for the investigation and analysis of state of the art data base technology. These facilities support collaborative testing with researchers, vendors, users, and standards developers.

  4. A Review of Information for Managing Aging in Nuclear Power Plants

    SciTech Connect

    WC Morgan; JV Livingston

    1995-09-01

    Age related degradation effects in safety related systems of nuclear power plants should be managed to prevent safety margins from eroding below the acceptable limits provided in plant design bases. The Nuclear Plant Aging Research (NPAR) Pro- gram, conducted under the auspices of the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research, and other related aging management programs are developing technical information on managing aging. The aging management process central to these efforts consists of three key elements: 1) selecting structures, systems, and components (SSCs) in which aging should be controlled; 2) understanding the mechanisms and rates of degradation in these SSCs; and 3) managing degradation through effective inspection, surveillance, condition monitoring, trending, record keeping, mainten- ance, refurbishment, replacement, and adjustments in the operating environment and service conditions. This document concisely reviews and integrates information developed under the NPAR Program and other aging management studies and other available information related to understanding and managing age-related degradation effects and provides specific refer- ences to more comprehensive information on the same subjects.

  5. Interdisciplinary Programs Focused Populations: The Case of Health Management Program

    ERIC Educational Resources Information Center

    Davidovitch, Nitza; Yavich, Roman

    2015-01-01

    The Ariel University has a unique interdisciplinary program in healthcare management that targets experienced healthcare professionals who wish to earn an academic degree. Only one academic study has been held so far on the integration of graduates of an academic university-level school in healthcare management in the field. In the current study,…

  6. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  7. Economic value evaluation in disease management programs.

    PubMed

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  8. Data warehousing in disease management programs.

    PubMed

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  9. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  10. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  11. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  12. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  13. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  14. Evaluation of a Community-Based Aging Intervention Program

    ERIC Educational Resources Information Center

    Hsu, Hui-Chuan; Wang, Chun-Hou; Chen, Yi-Chun; Chang, Ming-Chen; Wang, Jean

    2010-01-01

    This study evaluated the outcome and process of a community-based aging intervention program for the elderly in Taiwan. The program included education on nutrition and dietary behavior and on physical activities. Outcome and process evaluations were conducted. The program may have had some effects on decreasing some dietary behavioral problems and…

  15. One System for Blood Program Information Management

    PubMed Central

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  16. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  17. Aging Management Guideline for commercial nuclear power plants: Power and distribution transformers

    SciTech Connect

    Toman, G.; Gazdzinski, R.

    1994-05-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in power and distribution transformers important to license renewal in commercial nuclear power plants. The intent of this AMG to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner which allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  18. Aging management guideline for commercial nuclear power plants-stationary batteries. Final report

    SciTech Connect

    Berg, R.; Shao, J.; Krencicki, G.; Giachetti, R.

    1994-03-01

    The Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant stationary batteries important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  19. Aging Management Guideline for commercial nuclear power plants: Electrical switchgear. Final report

    SciTech Connect

    Toman, G.; Gazdzinski, R.; Schuler, K.

    1993-07-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant electrical switchgear important to license renewal. The latent of this AMG to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner which allows personnel responsible for performance analysis and maintenance, to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  20. Aging Management Guideline for commercial nuclear power plants: Motor control centers; Final report

    SciTech Connect

    Toman, G.; Gazdzinski, R.; O`Hearn, E.

    1994-02-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) commercial nuclear power plant motor control centers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  1. Cryogenic fluid management program flight concept definition

    NASA Technical Reports Server (NTRS)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  2. UNBC: Outdoor Recreation and Tourism Management Program

    ERIC Educational Resources Information Center

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  3. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... planning and management activities. Grant administrative requirements for these funds appear in 40 CFR... 40 CFR part 35, subpart J. A State may also use part of the 205(g) funds to administer approved... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section...

  4. Fashion Production and Management Program Guide.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Div. of Vocational Education.

    This program guide presents the standard fashion production and management curriculum for technical institutes in Georgia. It is designed to relate primarily to the development of those skills needed to become a qualified alterationist, clothing design assistant, home textiles assistant, fashion management assistant, or tailoring assistant. A…

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1993-01-01

    This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  7. Software Program: Software Management Guidebook

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

  8. Computer-Aided Corrosion Program Management

    NASA Technical Reports Server (NTRS)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  9. Community Energy Management Programs for Commercial Building Owners and Managers.

    ERIC Educational Resources Information Center

    Chick, Walter S.

    1987-01-01

    A voluntary program in Ontario encourages the private sector to reduce its energy consumption in commercial buildings by experimenting with innovative building operation techniques. Charts and tables illustrate the outstanding results achieved by program participants. Yearly energy management forums are convened in Toronto and Ottawa. (MLF)

  10. A Natural Resources Management Program

    ERIC Educational Resources Information Center

    Lancaster, George B.

    1977-01-01

    Three years of instruction in natural resources management (NRM) are offered at Louisa County High School, Mineral, Virginia, with 30 acres of land for use as outdoor classrooms. Instructional areas are grouped under forestry; crops and soils; and surveying, air, water, recreation, and general. Two years of basic agriculture science and mechanics…

  11. Risk Management for Wilderness Programs.

    ERIC Educational Resources Information Center

    Schimelpfenig, Tod

    This paper discusses subjective hazards in wilderness activities and suggests means of assessing and managing related risks. Wilderness educators conveniently group hazards into objective and subjective ones. Objective hazards such as rockfall, moving water, and weather, while not necessarily predictable, are visible and understandable. Subjective…

  12. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  13. 76 FR 39857 - Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... National Oceanic Atmospheric Administration Alaska Coastal Management Program Withdrawal From the National... Coastal Resource Management (OCRM), National Ocean Service (NOS), National Oceanic Atmospheric Administration (NOAA), Department of Commerce (Commerce). ACTION: Notice. SUMMARY: By operation of Alaska...

  14. NASA management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Peters, F.

    1975-01-01

    The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

  15. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  16. Hybrid Power Management Program Continued

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2002-01-01

    Hybrid Power Management (HPM) is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and photovoltaics. HPM has extremely wide potential with applications including power-generation, transportation, biotechnology, and space power systems. It may significantly alleviate global energy concerns, improve the environment, and stimulate the economy.

  17. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  18. AGING WATER INFRASTRUCTURE RESEARCH PROGRAM: ADDRESSING THE CHALLENGE THROUGH INNOVATION

    EPA Science Inventory

    A driving force behind the Sustainable Water Infrastructure (SI) initiative and the Aging Water Infrastructure (AWI) research program is the Clean Water and Drinking Water Infrastructure Gap Analysis. In this report, EPA estimated that if operation, maintenance, and capital inves...

  19. Thymic Involution in Ontogenesis: Role in Aging Program.

    PubMed

    Shilovsky, G A; Feniouk, B A; Skulachev, V P

    2015-12-01

    In most mammals, involution of the thymus occurs with aging. In this issue of Biochemistry (Moscow) devoted to phenoptosis, A. V. Khalyavkin considered involution of a thymus as an example of the program of development and further--of proliferation control and prevention of tumor growth. However, in animals devoid of a thymus (e.g. naked mice), stimulation of carcinogenesis, but not its prevention was observed. In this report, we focus on the involution of the thymus as a manifestation of the aging program (slow phenoptosis). We also consider methods of reversal/arrest of this program at different levels of organization of life (cell, tissue, and organism) including surgical manipulations, hormonal effects, genetic techniques, as well as the use of conventional and mitochondria-targeted antioxidants. We conclude that programmed aging (at least on the model of age-dependent thymic atrophy) can be inhibited. PMID:26638690

  20. Real estate management program implementation handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook provides a ready reference to pertinent policy and guidance for the management of real estate activities in NASA. Real property means buildings, structures, utility systems, and land, along with its permanently connected appurtenances and improvements. The Real Estate Management Program is designed to provide a uniform and orderly process for meeting NASA's programmatic and institutional real estate needs and other real estate management requirements. The purpose of this Real Estate Management Program Implementation Handbook (REMPIH) is to provide guidance and assistance to NASA officials in carrying out their responsibilities for the review, reporting, accounting, acquisition, and disposal of NASA controlled/occupied real estate in accordance with the applicable procedures of 14 CFR 1204.501, 1204.503, 1204.504, and Attachment A to NMI 8800.14. The REMPIH provides a concise, non-technical, and authoritative reference for the efficient management of NASA real estate.

  1. Continuous Risk Management: A NASA Program Initiative

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  2. Nuclear Materials Management Program at the NNSS

    SciTech Connect

    ,

    2012-06-08

    The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was established in 1951 mainly for weapons testing; because special nuclear materials (SNM) were expended during the tests, a nuclear material management program was not required. That changed in December 2004 with the receipt of Category I SNM for purposes other than weapons testing. At that time, Material Control and Accountability and Nuclear Material Management were a joint laboratory (Los Alamos and Lawrence Livermore) effort with nuclear material management being performed at the laboratories. That changed in March 2006 when the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office appointed sole responsibility to the Management and Operations (M&O) contractor, National Security Technologies, LLC (NSTec). Since 2006 the basic nuclear material management work was completed by a combination of M&O employees and subcontractors, but a true Nuclear Material Management (NMM) Program was not determined to be necessary until recently. With expanding missions and more nuclear material (NM) coming to the NNSS, it became imperative to have an organization to manage these materials; therefore, an NMM Manager was officially appointed by NSTec in 2012. In June 2011 a Gap Analysis and white paper was completed by a subcontractor; this presentation will include highlights from those documents along with our plans to resolve the “gaps” and stand up a functional and compliant NMM Program at the NNSS.

  3. Managing the aging man in Asia: a review.

    PubMed

    Tong, Seng Fah; Ho, Christopher; Tan, Hui Meng

    2011-01-01

    The aging man is becoming a major burden to Asian countries because of the current poor health status of Asian men and the aging Asian population. Life expectancy at birth for men is shorter than women by an average of 4 years in Asian countries and major causes of death are cardiovascular disease, cancers, injuries and infections. However, there are considerable variations between Asian countries because of great disparity in socioeconomic status. Male-specific disorders, such as male sexual health and urological conditions, are other major health burdens because they have a great impact on men's quality of life. More importantly, many risk factors to the causes of mortality and morbidities, such as high-risk behavior and smoking, can be improved with health promotion and early intervention. The current evidence suggests that the poor health status of men is the result of their poor health care utilization, negative health-seeking behavior, the adverse social environment for men and gender-insensitive health care delivery. However, much evidence is still needed as Asian countries have great diversity in culture, societal values and men's needs. Asian time-tested wisdom on a balanced healthy lifestyle to longevity should be explored as potential men's health promotional programs. Taking into account Asian men's health-care needs, a gender-streamlined approach and man-friendly health care delivery should be on the national agenda in managing the aging man. PMID:20969645

  4. Chapter 5, "License Renewal and Aging Management for Continued Service

    SciTech Connect

    Naus, Dan J

    2013-01-01

    As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.

  5. The configuration management program for the Emergency Management Support System

    SciTech Connect

    Probasco, K M; Stephan, E G

    1991-08-01

    Emergency response software is used increasingly by the US Department of Energy's (DOE's) Emergency Management Project (EMP) personnel at Hanford Site. This software must be reliable, of high quality, and capable of performing critical functions to support assessment of actual or potential consequences of any hazardous accidents onsite or events having potential offsite impacts. To better control the software and ensure its suitability for use as a tool to protect employees, the public, and environment, a method for specifying and certifying its capabilities and documenting its development and implementation was needed. A team of EMP staff, composed of personnel from Pacific Northwest Laboratory (PNL) and Boeing Computer Services- Richland (BCSR) under the direction of PNL EMP, responded to this need by developing a software configuration management program (CMP). This report documents the development of the CMP, including the strategies upon which the CMP is based, and describes the program as it has been implemented for EMS System software. The program relies on the integration of its three primary elements: the configuration management staff, tools, and process. Configuration management staff run the program, using specially designed configuration management forms to guide, document, and track the life cycle of the software. The configuration management process itself is reflected in the instructive forms and summarized in flowcharts representing each phase of the process -- from requirements specification through implementation and maintenance. 7 refs., 9 figs., 1 tab.

  6. Managing aging in nuclear power plants: Insights from NRC`s Maintenance Team Inspection reports

    SciTech Connect

    Fresco, A.; Subudhi, M.

    1992-12-31

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified.

  7. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    SciTech Connect

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified.

  8. Kids Club: A School-Age Program Guide for Directors.

    ERIC Educational Resources Information Center

    Sisson, Linda G.

    This handbook for administrators of school-age day care programs offers guidelines on implementing Kids Club programs. Kids Clubs coordinate family and public school resources to meet elementary children's needs for adult supervision and guidance when the children are not in school and their parents are at work. The handbook consists of seven…

  9. 77 FR 55105 - Aging Airplane Program: Widespread Fatigue Damage; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... establish a limit of validity of the engineering data that supports the structural maintenance program... tables. This document corrects the errors in those tables. DATES: This corrective action becomes... entitled ``Aging Airplane Program: Widespread Fatigue Damage'' (77 FR 30877), which corrected a final...

  10. Cross-Age Tutoring and the Reading Together Program

    ERIC Educational Resources Information Center

    Hattie, John

    2006-01-01

    This article presents three related evaluation studies looking at the effectiveness on achievement and motivation of Reading Together, a cross-age peer-tutoring reading program. The effects on tutees, tutors, teachers, and parents were monitored. The advantages of Reading Together began to accrue during the second and third phases of the program.…

  11. Organization and management of space grant programs

    NASA Technical Reports Server (NTRS)

    Sheppard, Sallie; Nichols, Steve

    1990-01-01

    The 21 Space Grant Programs represent a broad range of organizational structures which operate programs ranging in size from single university organizations to organizations including up to 41 members involving a composite of industrial organizations such as state agencies, and universities. Some of the space grant awards were made to organizations already in existence with on-going programs while other awards were made to consortia newly formed for the purpose of applying to the Space Grant Program. The workshop on organization and management of Space Grant Programs provided an opportunity for directors and program representatives to discuss and compare the relative advantages and disadvantages of the various models being used. This paper offers examples of the diversity of organizations, summarizes the common concerns to be met by each organizational model, and provides a case study of the Texas Space Grant Consortium organization.

  12. The Marshall Islands Data Management Program

    SciTech Connect

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  13. Cost reduction potential in space program management

    NASA Astrophysics Data System (ADS)

    Tischler, Adelbert O.

    The barrier to low cost space programs has been identified, and we are it. Principal among the causes for escalation of space program costs is the 'system' which has evolved to control programs. The 'system' includes not only the procedures and documents that constitute the flow of paper, the reviews and approvals necessary to initiate actions, and the entire methodology of the decision-making and approval processes but, necessarily, the people, including political as well as industrial counterparts, who populate these environments. This complex 'system' has proliferated so that it now promotes time-taking routines, obstructs prompt action, inhibits decisions, extends schedules and escalates costs. Designed to aid and abet management by supplying information necessary to maintain cognizance of program status the 'system' has taken over the role of management. Problems and their solutions must now be addressed to the 'system' as aided and abetted by management. Most of the evident causes of program cost problems have long since been recognized. Attacking them will produce second-order effects until management is willing to face up to the internal cost driver.

  14. Programmed environment management of confined microsocieties

    NASA Technical Reports Server (NTRS)

    Emurian, Henry H.

    1988-01-01

    A programmed environment is described that assists the implementation and management of schedules governing access to all resources and information potentially available to members of a confined microsociety. Living and work schedules are presented that were designed to build individual and group performance repertoires in support of study objectives and sustained adaptation by participants. A variety of measurement requirements can be programmed and standardized to assure continuous assessment of the status and health of a confined microsociety.

  15. Ada programming guidelines for deterministic storage management

    NASA Technical Reports Server (NTRS)

    Auty, David

    1988-01-01

    Previous reports have established that a program can be written in the Ada language such that the program's storage management requirements are determinable prior to its execution. Specific guidelines for ensuring such deterministic usage of Ada dynamic storage requirements are described. Because requirements may vary from one application to another, guidelines are presented in a most-restrictive to least-restrictive fashion to allow the reader to match appropriate restrictions to the particular application area under investigation.

  16. Pediatric CT quality management and improvement program.

    PubMed

    Larson, David B; Molvin, Lior Z; Wang, Jia; Chan, Frandics P; Newman, Beverley; Fleischmann, Dominik

    2014-10-01

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve.

  17. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... Terrorism Risk Insurance Program; Litigation Management Submissions AGENCY: Departmental Offices. ACTION..., the Terrorism Risk Insurance Program Office is seeking comments regarding Litigation Management..., preferably an original and two copies) to: Terrorism Risk Insurance Program, Public Comment Record,...

  18. Aging management guideline for commercial nuclear power plants - tanks and pools

    SciTech Connect

    Blocker, E.; Smith, S.; Philpot, L.; Conley, J.

    1996-02-01

    Continued operation of nuclear power plants for periods that extend beyond their original 40-year license period is a desirable option for many U.S. utilities. U.S. Nuclear Regulatory Commission (NRC) approval of operating license renewals is necessary before continued operation becomes a reality. Effective aging management for plant components is important to reliability and safety, regardless of current plant age or extended life expectations. However, the NRC requires that aging evaluations be performed and the effectiveness of aging management programs be demonstrated for components considered within the scope of license renewal before granting approval for operation beyond 40 years. Both the NRC and the utility want assurance that plant components will be highly reliable during both the current license term and throughout the extended operating period. In addition, effective aging management must be demonstrated to support Maintenance Rule (10 CFR 50.65) activities.

  19. Leadership and management in the aged care sector: a narrative synthesis.

    PubMed

    Jeon, Yun-Hee; Merlyn, Teri; Chenoweth, Lynn

    2010-06-01

    The aim of this study is to examine the issues and the progress being made in leadership and management with relevance for the residential aged care workforce. A systematic review was conducted using scientific journal databases, hand searching of specialist journals, Google, snowballing and suggestions from experts. After a seven-tiered culling process, we conducted a detailed review of 153 papers relevant to leadership and management development in aged care. Strong, effective leadership and management promotes staff job satisfaction and retention, high care quality and the well-being of care recipients, and reduces associated costs. Good leadership and effective management also play a key role in bringing about a successful change to a positive workplace culture through innovative programs and research projects. Organisational investment in improving leadership and management skills and capabilities can only improve outcomes for staff stability and productivity, care quality and budgets, and better prepare the aged care sector. PMID:20553534

  20. Sandia National Laboratories, California Waste Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  1. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  2. Parents are Teachers: A Child Management Program.

    ERIC Educational Resources Information Center

    Becker, Wesley C.

    This manual is designed to help parents apply reinforcement theory in managing their children. The program explains how parents can systematically use consequences to teach children in positive ways. Units include: When to Reinforce; How to Reinforce; Reinforcement and Punishment in Everyday Life; and Why Parents (and Teachers) Goof; the Criticism…

  3. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  4. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  5. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  6. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  7. Choosing the Right Database Management Program.

    ERIC Educational Resources Information Center

    Vockell, Edward L.; Kopenec, Donald

    1989-01-01

    Provides a comparison of four database management programs commonly used in schools: AppleWorks, the DOS 3.3 and ProDOS versions of PFS, and MECC's Data Handler. Topics discussed include information storage, spelling checkers, editing functions, search strategies, graphs, printout formats, library applications, and HyperCard. (LRW)

  8. Management System for EMR Work Study Program.

    ERIC Educational Resources Information Center

    Columbia County Board of Public Instruction, Lake City, FL. Exceptional Child Education Dept.

    A computerized information management system involving the specification of objectives, the coding of teacher evaluations of students, and a variety of possible outputs has been used in a work study program for educable mentally retarded adolescents. Instructional objectives are specified and coded by number and category. Evaluation is by means of…

  9. Health Occupations Education Program Management Guide.

    ERIC Educational Resources Information Center

    Iowa Univ., Iowa City. Coll. of Education.

    This final report describes a project to develop a secondary education program management guide for health occupations education in Iowa. Introductory material includes the following: a summary sheet on project objectives, a description of how the objectives were met, the audience served, an educational equity statement, a statement that the…

  10. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  11. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  12. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  13. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  14. IMP-32--An Interactive Management Program.

    ERIC Educational Resources Information Center

    Hayes, L. Susan; Vogel, Judith A.

    1982-01-01

    Describes the development by Gould, Inc., S.E.L. Computer Systems Division, of an Information Management Package (IMP-32) for use in administration of the company's technical information center. Designing the system, the programs which are components of the system, and system functions are discussed. Included are eight figures illustrating system…

  15. Toward a Distinctive Christian Undergraduate Management Program

    ERIC Educational Resources Information Center

    Smith, Thomas M.; VanderVeen, Steve

    2008-01-01

    We motivate and develop a theoretical framework for creating a distinctive Christian undergraduate management program that is directed toward providing (a) the necessary intellectual characteristics to do "well" and (b) the necessary emotional characteristics to do "good." This framework consists of seven propositions that connect the learning…

  16. 14 CFR 91.1003 - Management contract between owner and program manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION,...

  17. 14 CFR 91.1003 - Management contract between owner and program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION,...

  18. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  19. Recommendations for managing equipment aging in nuclear power plants

    SciTech Connect

    Gunther, W.E.; Subudhi, M. ); Aggarwal, S.K. )

    1992-01-01

    Research conducted under the auspices of the US NRC's Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures.

  20. Recommendations for managing equipment aging in nuclear power plants

    SciTech Connect

    Gunther, W.E.; Subudhi, M.; Aggarwal, S.K.

    1992-12-01

    Research conducted under the auspices of the US NRC`s Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures.

  1. FEMP (Federal Energy Management Program) Update, Spring 1989

    SciTech Connect

    Not Available

    1989-04-01

    The FEMP Update, published quarterly by the Federal Energy Management Program (FEMP), provides information that will assist federal managers in their energy management responsibilities. The Update is distributed primarily to federal facility and energy management personnel.

  2. Promoting successful aging through effective prevention and management of osteoporosis.

    PubMed

    Cavalieri, Thomas A; Noll, Donald R

    2013-02-01

    Successful aging has been described as having 3 components: a low probability of disease and disease-related disability, a capacity for high cognitive and physical function, and active engagement with social and productive activities. Osteopathic physicians play a critical role in the promotion of successful aging through the prevention, early detection, and management of osteoporosis. Not many years ago, osteoporosis was viewed as an age-related disorder for which there was a lack of effective approaches for early intervention and management. Now, that view has changed.

  3. Business management in the information age

    NASA Astrophysics Data System (ADS)

    Misawa, Chiyoji

    This is the record of the Special Lecture at the 25th Annual Meeting on Information Science and Technology. In the first half, how managers should collect and utilize the scientific and technical information is described, based on the author' own experience. Author says they should visit the source organization by themselves when they find the interesting information. To make high use of such information, they are needed to be well acquainted with the conditions of their own facilities and technology etc., he mentions. In the second half, from historical point of view, the development of Japanese industry and technology for the past 40 years is reviewed, and he expects the databases would be utilized promote the research and development in order to make our country have a new energy resources.

  4. Aging of perennial cells and organ parts according to the programmed aging paradigm.

    PubMed

    Libertini, Giacinto; Ferrara, Nicola

    2016-04-01

    If aging is a physiological phenomenon-as maintained by the programmed aging paradigm-it must be caused by specific genetically determined and regulated mechanisms, which must be confirmed by evidence. Within the programmed aging paradigm, a complete proposal starts from the observation that cells, tissues, and organs show continuous turnover: As telomere shortening determines both limits to cell replication and a progressive impairment of cellular functions, a progressive decline in age-related fitness decline (i.e., aging) is a clear consequence. Against this hypothesis, a critic might argue that there are cells (most types of neurons) and organ parts (crystalline core and tooth enamel) that have no turnover and are subject to wear or manifest alterations similar to those of cells with turnover. In this review, it is shown how cell types without turnover appear to be strictly dependent on cells subjected to turnover. The loss or weakening of the functions fulfilled by these cells with turnover, due to telomere shortening and turnover slowing, compromises the vitality of the served cells without turnover. This determines well-known clinical manifestations, which in their early forms are described as distinct diseases (e.g., Alzheimer's disease, Parkinson's disease, age-related macular degeneration, etc.). Moreover, for the two organ parts (crystalline core and tooth enamel) without viable cells or any cell turnover, it is discussed how this is entirely compatible with the programmed aging paradigm.

  5. Characteristics of Older Georgians Receiving Older Americans Act Nutrition Program Services and Other Home- and Community-Based Services: Findings from the Georgia Aging Information Management System (GA AIMS).

    PubMed

    Lee, Jung Sun; Shannon, Jerry; Brown, Arvine

    2015-01-01

    This descriptive study examined characteristics of older Georgians receiving Older Americans Act Nutrition Program Services and other home- and community-based services (HCBS) using state aging administrative data (N = 31,341, mean age: 76.6 ± 9.2 y, 71.2% female, 52.3% White). Home-delivered meals (HDM) was used most frequently. The characteristics of older Georgian HCBS participants varied by the type and number of HCBS received. Those receiving HDM and other in-home and caregiving services were more likely to show poorer sociodemographic, economic, and functional characteristics, and food insecurity. Those receiving multiple HCBS were most vulnerable, but showed lower level of food insecurity than those receiving single HCBS, suggesting potential combined benefits of receiving multiple programs. This study underscores the importance of documenting dynamic needs for HCBS, especially HDM, among vulnerable older adults as part of standard administrative process to identify those at high risk of institutionalization, optimize HCBS delivery and coordination, and maximize HCBS benefits. PMID:26106986

  6. Characteristics of Older Georgians Receiving Older Americans Act Nutrition Program Services and Other Home- and Community-Based Services: Findings from the Georgia Aging Information Management System (GA AIMS).

    PubMed

    Lee, Jung Sun; Shannon, Jerry; Brown, Arvine

    2015-01-01

    This descriptive study examined characteristics of older Georgians receiving Older Americans Act Nutrition Program Services and other home- and community-based services (HCBS) using state aging administrative data (N = 31,341, mean age: 76.6 ± 9.2 y, 71.2% female, 52.3% White). Home-delivered meals (HDM) was used most frequently. The characteristics of older Georgian HCBS participants varied by the type and number of HCBS received. Those receiving HDM and other in-home and caregiving services were more likely to show poorer sociodemographic, economic, and functional characteristics, and food insecurity. Those receiving multiple HCBS were most vulnerable, but showed lower level of food insecurity than those receiving single HCBS, suggesting potential combined benefits of receiving multiple programs. This study underscores the importance of documenting dynamic needs for HCBS, especially HDM, among vulnerable older adults as part of standard administrative process to identify those at high risk of institutionalization, optimize HCBS delivery and coordination, and maximize HCBS benefits.

  7. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1411 Continuous airworthiness maintenance program use by fractional ownership program manager. Fractional ownership...

  8. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1411 Continuous airworthiness maintenance program use by fractional ownership program manager. Fractional ownership...

  9. Experiences with physical conditioning programs in middle-aged men

    NASA Technical Reports Server (NTRS)

    Schuster, B.; Stanley, E.

    1969-01-01

    Long term effects of physical exercise and conditioning in the prevention and treatment of coronary heart disease are studied. Some aspects of the problem are outlined and difficulties encountered in a group of middle aged business executives using a carefully prescribed, but non-regimented and loosely supervised conditioning program employing commonly used forms of exercise (bicycling and jogging), are described.

  10. VISION SCREENING PROGRAMS, PRE-SCHOOL AND SCHOOL AGE.

    ERIC Educational Resources Information Center

    TREGANZA, AMORITA; AND OTHERS

    VISION PROBLEMS CAN BE DETECTED IN PRESCHOOL AND SCHOOL AGE CHILDREN BY THE USE OF THE APPROPRIATE TESTS OUTLINED IN THIS BOOKLET. THESE TESTS ARE DESIGNED TO BE ADMINISTERED IN PART BY LAY PERSONNEL UNDER THE DIRECTION OF AN OPTOMETRIC CONSULTANT. THE ENTIRE PROGRAM CONSISTS OF THE COMPLETION OF A DEVELOPMENTAL QUESTIONNAIRE BY THE PARENTS, AN…

  11. The Indiana Chronic Disease Management Program

    PubMed Central

    Rosenman, Marc B; Holmes, Ann M; Ackermann, Ronald T; Murray, Michael D; Doebbeling, Caroline Carney; Katz, Barry; Li, Jingjin; Zillich, Alan; Prescott, Victoria M; Downs, Stephen M; Inui, Thomas S

    2006-01-01

    The Indiana Chronic Disease Management Program (ICDMP) is intended to improve the quality and cost-effectiveness of care for Medicaid members with congestive heart failure (chronic heart failure), diabetes, asthma, and other conditions. The ICDMP is being assembled by Indiana Medicaid primarily from state and local resources and has seven components: (1) identification of eligible participants to create regional registries, (2) risk stratification of eligible participants, (3) nurse care management for high-risk participants, (4) telephonic intervention for all participants, (5) an Internet-based information system, (6) quality improvement collaboratives for primary care practices, and (7) program evaluation. The evaluation involves a randomized controlled trial in two inner-city group practices, as well as a statewide observational design. This article describes the ICDMP, highlights challenges, and discusses approaches to its evaluation. PMID:16529571

  12. Managing in an age of modularity.

    PubMed

    Baldwin, C Y; Clark, K B

    1997-01-01

    Modularity is a familiar principle in the computer industry. Different companies can independently design and produce components, suck as disk drives or operating software, and those modules will fit together into a complex and smoothly functioning product because the module makers obey a given set of design rules. Modularity in manufacturing is already common in many companies. But now a number of them are beginning to extend the approach into the design of their products and services. Modularity in design should tremendously boost the rate of innovation in many industries as it did in the computer industry. As businesses as diverse as auto manufacturing and financial services move toward modular designs, the authors say, competitive dynamics will change enormously. No longer will assemblers control the final product: suppliers of key modules will gain leverage and even take on responsibility for design rules. Companies will compete either by specifying the dominant design rules (as Microsoft does) or by producing excellent modules (as disk drive maker Quantum does). Leaders in a modular industry will control less, so they will have to watch the competitive environment closely for opportunities to link up with other module makers. They will also need to know more: engineering details that seemed trivial at the corporate level may now play a large part in strategic decisions. Leaders will also become knowledge managers internally because they will need to coordinate the efforts of development groups in order to keep them focused on the modular strategies the company is pursuing.

  13. Coastal Zone Management program in Kerala, India

    SciTech Connect

    Mallik, T.K. )

    1987-01-01

    The physiographic setting of Kerala State, India, is unique. A narrow strip of the state contains a chain of lagoons and estuaries with a very high population density. The strip is subjected to severe coastal erosion during the monsoon season. A number of other problems are also associated with the coastal zone of Kerala, such as irregular dredging of black sands from the beaches, coastal flooding, hazards due to developmental activities, etc. A Coastal Zone Management Program was developed and administered by the Centre for Earth Science Studies, Trivandrum, to provide efficient coastal management and solve some of these problems. Various programs included under the Coastal Zone Management are the following: (1) Sedimentological, bathymetric, and geochemical studies of lagoons and estuaries; (2) monitoring of planimetric changes of beaches by profiling beaches during different seasons all along the coast; (3) studies of the nature, distribution, and provenance of black sand deposits from beaches; (4) studies of the peculiar occurrence of patchy, calm, turbid areas of water in the offshore containing high suspended sediment concentrate known as mud banks; (5) wave studies involving continuous monitoring of wave data all along the coast in order to understand wave climate and erosion; (6) sediment movement studies using fluorescent tracer to aid in the development of ports and harbors; (7) studies on various aspects of offshore. The outlines of the various programs discussed in this article will help other states and countries to develop a coastal zone management program according to the needs of the state or country and the nature of the problem occurring in the coastal zone.

  14. 1998 Environmental Management Science Program Annual Report

    SciTech Connect

    1999-03-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

  15. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  16. An integrated scheduling and program management system

    NASA Astrophysics Data System (ADS)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  17. Theories and Management of Aging: Modern and Ayurveda Perspectives

    PubMed Central

    Datta, Hema Sharma; Mitra, S. K.; Paramesh, Rangesh; Patwardhan, Bhushan

    2011-01-01

    Aging is a complex phenomenon, a sum total of changes that occur in a living organism with the passage of time and lead to decreasing ability to survive stress, increasing functional impairment and growing probability of death. There are many theories of aging and skin remains the largest organ of the study. Skin aging is described as a consequence of intrinsic and extrinsic factors. The most common amongst visible signs of skin aging are wrinkles and there are various therapies including antiaging cosmeceuticals, sunscreens, chemical peeling, injectable agents, such as botox, fibrel, autologous fat grafting as also few surgical procedures have been used. Ayurveda, the Indian traditional medicine, describes aging with great details. This review provides modern and Ayurvedic perspectives on theories and management of aging. PMID:19233879

  18. University Program Management Information System: NASA's University Program Active Projects

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  19. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  20. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  1. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  2. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary

    1997-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  3. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  4. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  5. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  6. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  7. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  8. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  9. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  10. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  11. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  12. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  13. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  14. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  15. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  16. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  17. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  18. An Analysis of the Radio Program Manager Occupation.

    ERIC Educational Resources Information Center

    Friedberg, Jerry; Stella, Phillip.

    This occupational analysis data was assembled to help broadcasting arts teachers develop a course of study in program management for junior and senior high school students. Following a job description for a program manager, the remainder of the content in standard task analysis format presents an analysis of nine program management duties (tasks).…

  19. 77 FR 12905 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Program Management Committee. DATES: The meeting will be held March 21, 2012, from 8:30 a.m.-1:30...

  20. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  1. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  2. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  3. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  4. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  5. A generic hazardous waste management training program

    SciTech Connect

    Carter, R.J.; Karnofsky, B.

    1988-01-01

    The main purpose of this training program element is to familiarize personnel involved in hazardous waste management with the goals of RCRA and how they are to be achieved. These goals include: to protect health and the environment; to conserve valuable material and energy resources; to prohibit future open dumping on the land; to assure that hazardous waste management practices are conducted in a manner which protects human health and the environment; to insure that hazardous waste is properly managed thereby reducing the need for corrective actions in the future; to establish a national policy to reduce or eliminate the generation of hazardous waste, wherever feasible. Another objective of this progam element is to present a brief overview of the RCRA regulations and how they are implemented/enforced by the Environmental Protection Agency (EPA) and each of the fifty states. This element also discusses where the RCRA regulations are published and how they are updated. In addition it details who is responsible for compliance with the regulations. Finally, this part of the training program provides an overview of the activities and materials that are regulated. 1 ref.

  6. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and Atmospheric Administration (NOAA... Impact Statement (DEIS) prepared by NOAA's Office of Ocean and Coastal Resource Management. The...

  7. The role of the case manager in a disease management program.

    PubMed

    Huston, Carol J

    2002-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  8. The role of the case manager in a disease management program.

    PubMed

    Huston, C J

    2001-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  9. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management systems. 632.76 Section... for the overall management of all programs including: (1) Eligibility verification systems...

  10. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... for the overall management of all programs including: (1) Eligibility verification systems...

  11. Cryogenic fluid management program at MSFC

    NASA Technical Reports Server (NTRS)

    Schmidt, G. R.; Hastings, L. J.

    1990-01-01

    Cryogenic fluid management (CFM) is an important aspect in the design and operation of spacecraft propellant systems. Consequently, it represents a key technology in the development of future vehicles for orbital transfer, lunar transit and manned interplanetary (i.e., Mars) missions. Because of Marshall Space Flight Center's (MSFC's) leading role in the definition of such vehicles, the center is currently managing and conducting a variety of tests to support development of this technology. The purpose of this paper is to summarize these activities and present their status within the context of CFM technology requirements. The first section reviews MSFC's role, identifies the major emphases and thrusts of its program, and presents the overall schedule. The final part comprises the bulk of the report, and describes at length the objectives, approach and status of each project.

  12. The watershed and river systems management program

    USGS Publications Warehouse

    Markstrom, S.L.; Frevert, D.; Leavesley, G.H.; ,

    2005-01-01

    The Watershed and River System Management Program (WaRSMP), a joint effort between the U.S. Geological Survey (USGS) and the U.S. Bureau of Reclamation (Reclamation), is focused on research and development of decision support systems and their application to achieve an equitable balance among diverse water resource management demands. Considerations include: (1) legal and political constraints; (2) stake holder and consensus-building; (3) sound technical knowledge; (4) flood control, consumptive use, and hydropower; (5) water transfers; (6) irrigation return flows and water quality; (7) recreation; (8) habitat for endangered species; (9) water supply and proration; (10) near-surface groundwater; and (11) water ownership, accounting, and rights. To address the interdisciplinary and multi-stake holder needs of real-time watershed management, WaRSMP has developed a decision support system toolbox. The USGS Object User Interface facilitates the coupling of Reclamation's RiverWare reservoir operations model with the USGS Modular Modeling and Precipitation Runoff Modeling Systems through a central database. This integration is accomplished through the use of Model and Data Management Interfaces. WaRSMP applications include Colorado River Main stem and Gunnison Basin, the Yakima Basin, the Middle Rio Grande Basin, the Truckee-Carson Basin, and the Umatilla Basin.

  13. Program Helps Generate And Manage Graphics

    NASA Technical Reports Server (NTRS)

    Truong, L. V.

    1994-01-01

    Living Color Frame Maker (LCFM) computer program generates computer-graphics frames. Graphical frames saved as text files, in readable and disclosed format, easily retrieved and manipulated by user programs for wide range of real-time visual information applications. LCFM implemented in frame-based expert system for visual aids in management of systems. Monitoring, diagnosis, and/or control, diagrams of circuits or systems brought to "life" by use of designated video colors and intensities to symbolize status of hardware components (via real-time feedback from sensors). Status of systems can be displayed. Written in C++ using Borland C++ 2.0 compiler for IBM PC-series computers and compatible computers running MS-DOS.

  14. Managed care implications of age-related ocular conditions.

    PubMed

    Cardarelli, William J; Smith, Roderick A

    2013-05-01

    The economic costs of age-related ocular diseases and vision loss are increasing rapidly as our society ages. In addition to the direct costs of treating age-related eye diseases, elderly persons with vision loss are at significantly increased risk for falls and fractures, experiencing social isolation, and suffering from an array of comorbid medical conditions compared with individuals with normal vision. Recent studies estimate the total economic burden (direct and indirect costs) of adult vision impairment in the United States at $51.4 billion. This figure is expected to increase as the baby boomer generation continues to age. While a number of highly effective new therapies have caused a paradigm shift in the management of several major age-related ocular diseases in recent years, these treatments come at a substantial cost. This article reviews the economic burdens and treatment-related costs of 4 major ocular diseases of aging-glaucoma, age-related macular degeneration, diabetic retinopathy, and dry eye disease-and the implications for managed care.

  15. Mixed Waste Focus Area program management plan

    SciTech Connect

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  16. Uncertainty in age-specific harvest estimates and consequences for white-tailed deer management

    USGS Publications Warehouse

    Collier, B.A.; Krementz, D.G.

    2007-01-01

    Age structure proportions (proportion of harvested individuals within each age class) are commonly used as support for regulatory restrictions and input for deer population models. Such use requires critical evaluation when harvest regulations force hunters to selectively harvest specific age classes, due to impact on the underlying population age structure. We used a stochastic population simulation model to evaluate the impact of using harvest proportions to evaluate changes in population age structure under a selective harvest management program at two scales. Using harvest proportions to parameterize the age-specific harvest segment of the model for the local scale showed that predictions of post-harvest age structure did not vary dependent upon whether selective harvest criteria were in use or not. At the county scale, yearling frequency in the post-harvest population increased, but model predictions indicated that post-harvest population size of 2.5 years old males would decline below levels found before implementation of the antler restriction, reducing the number of individuals recruited into older age classes. Across the range of age-specific harvest rates modeled, our simulation predicted that underestimation of age-specific harvest rates has considerable influence on predictions of post-harvest population age structure. We found that the consequence of uncertainty in harvest rates corresponds to uncertainty in predictions of residual population structure, and this correspondence is proportional to scale. Our simulations also indicate that regardless of use of harvest proportions or harvest rates, at either the local or county scale the modeled SHC had a high probability (>0.60 and >0.75, respectively) of eliminating recruitment into >2.5 years old age classes. Although frequently used to increase population age structure, our modeling indicated that selective harvest criteria can decrease or eliminate the number of white-tailed deer recruited into older

  17. The Oak Ridge Refrigerant Management Program

    NASA Technical Reports Server (NTRS)

    Kevil, Thomas H.

    1995-01-01

    For many years, chlorofluorocarbons (CFC's) have been used by the Department of Energy's (DOE) Oak Ridge Y-12 Plant in air conditioning and process refrigeration systems. However, Title 6 of the Clean Air Act Amendments (CAAA) and Executive Order 12843 (Procurement Requirements and Policies for Federal Agencies for Ozone Depleting Substances) signed by President Clinton require, as policy, that all federal agencies maximize their use of safe, alternate refrigerants and minimize, where economically practical, the use of Class 1 refrigerants. Unfortunately, many government facilities and industrial plants have no plan or strategy in place to make this changeover, even though their air conditioning and process refrigeration equipment may not be sustainable after CFC production ends December 31, 1995. The Y-12 Plant in Oak Ridge, Tennessee, has taken an aggressive approach to complying with the CAAA and is working with private industry and other government agencies to solve tough manufacturing and application problems associated with CFC and hydrochlorofluorocarbon (HCFC) alternatives. Y-12 was the first DOE Defense Program (DP) facility to develop a long-range Stratospheric Ozone Protection Plan for refrigerant management for compliance with the CAAA. It was also the first DOE DP facility to complete detailed engineering studies on retrofitting and replacing all air conditioning and process refrigeration equipment to enable operation with alternate refrigerants. The management plan and engineering studies are models for use by other government agencies, manufacturing plants, and private industry. This presentation identifies some of the hidden pitfalls to be encountered in the accelerated phaseout schedule of CFC's and explains how to overcome and prevent these problems. In addition, it outlines the general issues that must be considered when addressing the phase-out of ozone depleting substances and gives some 'lessons learned' by Y-12 from its Refrigerant Management

  18. Adult Age Differences in Processing Narrative Text: Managing Character Representations

    ERIC Educational Resources Information Center

    Noh, Soo Rim

    2009-01-01

    Understanding a narrative situation depends on keeping track of multiple characters that enter and exit dynamically as the plot unfolds. Because there has been no systematic investigation of age differences in the ability to manage multiple characters during narrative comprehension, this project was designed to examine those differences in this…

  19. Aging management of containment structures in nuclear power plants

    SciTech Connect

    Naus, D.J.; Oland, C.B.; Ellingwood, B.R.; Graves, H.L. III; Norris, W.E.

    1994-12-31

    Research is being conducted by ORNL under US Nuclear Regulatory Commission (USNRC) sponsorship to address aging management of nuclear power plant containment and other safety-related structures. Documentation is being prepared to provide the USNRC with potential structural safety issues and acceptance criteria for use in continued service evaluations of nuclear power plants. Accomplishments include development of a Structural Materials Information Center containing data and information on the time variation of 144 material properties under the influence of pertinent environmental stressors or aging factors, evaluation of models for potential concrete containment degradation factors, development of a procedure to identify critical structures and degradation factors important to aging management, evaluations of nondestructive evaluation techniques. assessments of European and North American repair practices for concrete, review of parameters affecting corrosion of metals embedded in concrete, and development of methodologies for making current condition assessments and service life predictions of new or existing reinforced concrete structures in nuclear power plants.

  20. Lunasensor, infradian rhythms, telomeres, and the chronomere program of aging.

    PubMed

    Olovnikov, Alexey

    2005-12-01

    According to the redusome hypothesis, the aging of an organism is determined by the shortening of chronomeres (small perichromosomal linear DNA molecules). In this paper, a presumptive role for infradian hormonal rhythms is considered. Endogenous infradian rhythms are supposed to actively interact with those hormonal shifts which are governed by an exogenous infradian gravitational lunar rhythm. As a result of this interaction, the so-called T-rhythm is formed. Peaks of T-rhythms are used as the pacemaker signals to keep the life-long "clockwork" of the brain running. The "ticking" of this clock is realized by the periodically repeated shortening of chronomeres in postmitotic neuroendocrine cells, which occurs just at the maxima of T-rhythms. Shortening of telomeres in mitotic cells in vivo is a witness of the aging of the organism, but not the cause of aging. The primary cause of aging is shortening of chronomeres, the material carriers of a temporal program of development and aging. To recognize exogenous gravitational infradian rhythms, a special physiological system--the "lunasensor" system--evolved. It is assumed that it is a necessity to have a lunasensor as a particular variant of sensors of gravitation. PMID:16399890

  1. Evaluation of a Rural-Based Community Aged Intensive Recovery Program for Older Adults With Severe Mental Illness.

    PubMed

    Sadler, Paul; McIlvena, Andrea

    2015-09-01

    Community Aged Intensive Recovery (CAIR) programs are an integral part of Aged Persons Mental Health Services (APMHS); however, no study has investigated whether a rural-based intensive program benefits older clients with severe mental illness. The current sample comprised 119 older adults who were being managed by a CAIR program from July 2011 to June 2013. Three key results were found: (a) approximately three quarters of clients admitted to the CAIR program remained treated in the community; (b) the program assisted in significantly reducing the level of psychiatric symptom severity from CAIR entry to CAIR exit; and (c) the APMHS team with the CAIR program had a lower psychiatric inpatient rate compared to the APMHS team without the program. The current study highlights the importance of delivering effective rural-based CAIR programs to older adults experiencing severe mental illness.

  2. Diabetes disease management in Medicaid managed care: a program evaluation.

    PubMed

    Patric, Kenneth; Stickles, Joyce D; Turpin, Robin S; Simmons, Jeffrey B; Jackson, James; Bridges, Elizabeth; Shah, Manan

    2006-06-01

    The objective of this study was to evaluate the outcomes of a diabetes disease management initiative among TennCare's Medicaid Population. A quasi-experimental group design was conducted using a control group and a diabetes disease management intervention group. Primary outcomes measures were rates for three key recommended tests (ie, microalbuminuria, lipids, and hemoglobin A1c). Secondary performance measures --patient satisfaction and program evaluation issues -- also were assessed. The study was performed among TennCare beneficiaries with diabetes mellitus. It utilized a quasi-experimental nonequivalent control group design, with 993 intervention participants in Knoxville and 1167 control group members in Chattanooga. Variables analyzed included testing rates for hemoglobin A1c, lipids, microalbuminuria, and demographics. A logistic regression model using baseline covariates was constructed to analyze the differences between the intervention and the control groups. Intracluster correlations were accounted for by generalized estimating equations. Statistical process control detected process changes in testing rates over time. There were meaningful changes in the rate of ordering recommended tests. The odds of an individual in the intervention group having at least one microalbuminuria test were 196% more (confidence interval [CI] = 1.50, 5.82; p = 0.002); the odds of having at least one lipid profile were 43% more (CI = 1.01, 2.02; p = 0.042); and the odds of having two or more hemoglobin A1c tests were 39% more (CI = 0.87, 2.23; p = 0.165) than the odds of an individual in the control group. The analysis also showed a high rate of satisfaction among patients in the intervention group. The program was successful in meeting its stated goals of providing effective disease management for TennCare patients with diabetes.

  3. Aging Management Guideline for commercial nuclear power plants: Battery chargers, inverters and uninterruptible power supplies. Final report

    SciTech Connect

    Berg, R.; Stroinski, M.; Giachetti, R.

    1994-02-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant battery chargers, inverters and uninterruptible power supplies important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already, experienced) and aging management program activities to the more generic results and recommendations presented herein.

  4. Recommendations for managing cutaneous disorders associated with advancing age.

    PubMed

    Humbert, Philippe; Dréno, Brigitte; Krutmann, Jean; Luger, Thomas Anton; Triller, Raoul; Meaume, Sylvie; Seité, Sophie

    2016-01-01

    The increasingly aged population worldwide means more people are living with chronic diseases, reduced autonomy, and taking various medications. Health professionals should take these into consideration when managing dermatological problems in elderly patients. Accordingly, current research is investigating the dermatological problems associated with the loss of cutaneous function with age. As cell renewal slows, the physical and chemical barrier function declines, cutaneous permeability increases, and the skin becomes increasingly vulnerable to external factors. In geriatric dermatology, the consequences of cutaneous aging lead to xerosis, skin folding, moisture-associated skin damage, and impaired wound healing. These problems pose significant challenges for both the elderly and their carers. Most often, nurses manage skin care in the elderly. However, until recently, little attention has been paid to developing appropriate, evidence-based, skincare protocols. The objective of this paper is to highlight common clinical problems with aging skin and provide some appropriate advice on cosmetic protocols for managing them. A review of the literature from 2004 to 2014 using PubMed was performed by a working group of six European dermatologists with clinical and research experience in dermatology. Basic topical therapy can restore and protect skin barrier function, which relieves problems associated with xerosis, prevents aggravating moisture-associated skin damage, and enhances quality of life. In conclusion, the authors provide physicians with practical recommendations to assist them in implementing basic skin care for the elderly in an integrated care approach. PMID:26929610

  5. Recommendations for managing cutaneous disorders associated with advancing age

    PubMed Central

    Humbert, Philippe; Dréno, Brigitte; Krutmann, Jean; Luger, Thomas Anton; Triller, Raoul; Meaume, Sylvie; Seité, Sophie

    2016-01-01

    The increasingly aged population worldwide means more people are living with chronic diseases, reduced autonomy, and taking various medications. Health professionals should take these into consideration when managing dermatological problems in elderly patients. Accordingly, current research is investigating the dermatological problems associated with the loss of cutaneous function with age. As cell renewal slows, the physical and chemical barrier function declines, cutaneous permeability increases, and the skin becomes increasingly vulnerable to external factors. In geriatric dermatology, the consequences of cutaneous aging lead to xerosis, skin folding, moisture-associated skin damage, and impaired wound healing. These problems pose significant challenges for both the elderly and their carers. Most often, nurses manage skin care in the elderly. However, until recently, little attention has been paid to developing appropriate, evidence-based, skincare protocols. The objective of this paper is to highlight common clinical problems with aging skin and provide some appropriate advice on cosmetic protocols for managing them. A review of the literature from 2004 to 2014 using PubMed was performed by a working group of six European dermatologists with clinical and research experience in dermatology. Basic topical therapy can restore and protect skin barrier function, which relieves problems associated with xerosis, prevents aggravating moisture-associated skin damage, and enhances quality of life. In conclusion, the authors provide physicians with practical recommendations to assist them in implementing basic skin care for the elderly in an integrated care approach. PMID:26929610

  6. Development and Implementation of a Program Management Maturity Model

    SciTech Connect

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  7. Aging degradation of cast stainless steel: status and program

    SciTech Connect

    Chopra, O.K.; Ayrault, G.

    1983-10-01

    A program has been initiated to investigate the significance of in-service embrittlement of cast duplex stainless steels under light-water reactor operating conditions. The existing data are reviewed to determine the critical parameters that control the aging behavior and to define the objectives and scope of the investigation. The test matrices for microstructural studies and mechanical property measurements are presented. The initial experimental effort is focussed on characterizing the microstructure of long-term, low-temperature aged material. Specimens from three heats of cast CF-8 and CF-8M stainless steel aged for up to 70,000 h at 300, 350, and 400/sup 0/C were obtained from George Fisher Ltd., of Switzerland. Initial analyses reveal the formation of three different types of precipitates which are not ..cap alpha..'. An FCC phase, similar to the M/sub 23/C/sub 6/ precipitates, was present in all the long-term aged material. 15 references, 10 figures, 2 tables.

  8. Greenhouse Gas Management Program Overview (Fact Sheet)

    SciTech Connect

    Not Available

    2011-11-01

    Program fact sheet highlighting federal requirements for GHG emissions management, FEMP services to help agencies reduce emissions, and additional resources. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) assists Federal agencies with managing their greenhouse gas (GHG) emissions. GHG management entails measuring emissions and understanding their sources, setting a goal for reducing emissions, developing a plan to meet this goal, and implementing the plan to achieve reductions in emissions. FEMP provides the following services to help Federal agencies meet the requirements of inventorying and reducing their GHG emissions: (1) FEMP offers one-on-one technical assistance to help agencies understand and implement the Federal Greenhouse Gas Accounting and Reporting Guidance and fulfill their inventory reporting requirements. (2) FEMP provides training, tools, and resources on FedCenter to help agencies complete their annual inventories. (3) FEMP serves a leadership role in the interagency Federal Working Group on Greenhouse Gas Accounting and Reporting that develops recommendations to the Council on Environmental Quality (CEQ) for the Federal Greenhouse Gas Accounting and Reporting Guidance. (4) As the focus continues to shift from measuring emissions (completing inventories) to mitigating emissions (achieving reductions), FEMP is developing a strategic planning framework and resources for agencies to prioritize among a variety of options for mitigating their GHG emissions, so that they achieve their reduction goals in the most cost-effective manner. These resources will help agencies analyze their high-quality inventories to make strategic decisions about where to use limited resources to have the greatest impact on reducing emissions. Greenhouse gases trap heat in the lower atmosphere, warming the earth's surface temperature in a natural process known as the 'greenhouse effect.' GHGs include carbon dioxide (CO{sub 2}), methane (CH{sub 4

  9. TITAN 2 Reliability and Aging Surveillance Program (RASP)

    NASA Astrophysics Data System (ADS)

    Littleton, J. M.

    1982-02-01

    This report provides the results of RASP Phase I and Phase IA testing as completed for Missile Airborne and Ground Support Systems. The Phase I testing is conducted in conjunction with the missile recycle and removal of the engines for testing under the Service Life Analysis Program (SLAP), and includes special and critical testing of all airborne and ground support equipment for aging trends. Phase IA testing does not involve Recycle, SLAP Testing or Downloading of Propellants, but includes testing of all critical airborne and support equipment for launch readiness verification, aging trends, logistic support, special testing or inspection requirements. The data collected during RASP testing are reduced, analyzed and applied to the Titan II Weapon System Mathematical Model to produce estimates of system reliability. The actual system reliability estimates obtained are reported in the OO-ALC System Effectiveness Report (RCS LOG-MM(Q)7372).

  10. Development Program for Natural Aging Aluminum Casting Alloys

    SciTech Connect

    Dr. Geoffrey K. Sigworth

    2004-05-14

    A number of 7xx aluminum casting alloys are based on the ternary Al-Zn-Mg system. These alloys age naturally to high strength at room temperature. A high temperature solution and aging treatment is not required. Consequently, these alloys have the potential to deliver properties nearly equivalent to conventional A356-T6 (Al-Si-Mg) castings, with a significant cost saving. An energy savings is also possible. In spite of these advantages, the 7xx casting alloys are seldom used, primarily because of their reputation for poor castibility. This paper describes the results obtained in a DOE-funded research study of these alloys, which is part of the DOE-OIT ''Cast Metals Industries of the Future'' Program. Suggestions for possible commercial use are also given.

  11. Endogenous coresidence and program incidence: South Africa's Old Age Pension.

    PubMed

    Hamoudi, Amar; Thomas, Duncan

    2014-07-01

    We investigate whether living arrangements respond to an arguably exogenous shift in the distribution of power in family economic decision-making. In the early 1990s, the South African Old Age Pension was expanded to cover most black South Africans above a sex-specific age cut-off resulting in a substantial increase in the income of older South Africans and potentially their say in the economic decisions of their families. Beneficiaries of the program are more likely to coreside with adults who have less human capital as measured by height and education. Since height and education are fixed for adults, this cannot be an effect of the pension income but reflects selective changes in living arrangements resulting from the pension. The findings highlight the endogeneity of living arrangements and illustrate the potential value of moving beyond theory and data that are confined to a spatially determined definition of the household.

  12. Nuclear Waste Management Program summary document, FY 1981

    SciTech Connect

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  13. 78 FR 14151 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held March 20, 2013, from 8:30 a.m.-1:30 p.m. ADDRESSES:...

  14. 78 FR 57673 - RTCA Program Management Committee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... Federal Aviation Administration RTCA Program Management Committee; Meeting AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held October 8, 2013 from 8:30 a.m.-1:30 a.m. ADDRESSES:...

  15. 78 FR 43962 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held August 12, from 10:00 a.m.-2:00 p.m. ADDRESSES:...

  16. 78 FR 72747 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held December 18, from 8:30 a.m.-5:00 p.m. ADDRESSES:...

  17. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    ERIC Educational Resources Information Center

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  18. Integration of Risk Management Techniques into Outdoor Adventure Program Design.

    ERIC Educational Resources Information Center

    Bruner, Eric V.

    This paper is designed to acquaint the outdoor professional with the risk management decision making process required for the operation and management of outdoor adventure activities. The document examines the programming implications of fear in adventure activities; the risk management process in adventure programming; a definition of an…

  19. Ageing management of french NPP civil work structures

    NASA Astrophysics Data System (ADS)

    Gallitre, E.; Dauffer, D.

    2011-04-01

    This paper presents EDF practice about concrete structure ageing management, from the mechanisms analysis to the formal procedure which allows the French company to increase 900 MWe NPP lifetime until 40 years; it will also introduce its action plan for 60 years lifetime extension. This practice is based on a methodology which identifies every ageing mechanism; both plants feedback and state of the art are screened and conclusions are drawn up into an "ageing analysis data sheet". That leads at first to a collection of 57 data sheets which give the mechanism identification, the components that are concerned and an analysis grid which is designed to assess the safety risk. This analysis screens the reference documents describing the mechanism, the design lifetime hypotheses, the associated regulation or codification, the feedback experiences, the accessibility, the maintenance actions, the repair possibility and so one. This analysis has to lead to a conclusion about the risk taking into account monitoring and maintenance. If the data sheet conclusion is not clear enough, then a more detailed report is launched. The technical document which is needed, is a formal detailed report which summarizes every theoretical knowledge and monitoring data: its objective is to propose a solution for ageing management: this solution can include more inspections or specific research development, or additional maintenance. After a first stage on the 900 MWe units, only two generic ageing management detailed reports have been needed for the civil engineering part: one about reactor building containment, and one about other structures which focuses on concrete inflating reactions. The second stage consists on deriving this generic analysis (ageing mechanism and detailed reports) to every plant where a complete ageing report is required (one report for all equipments and structures of the plant, but specific for each reactor). This ageing management is a continuous process because the

  20. Dental Disease in Aged Horses and Its Management.

    PubMed

    Nicholls, Victoria M; Townsend, Neil

    2016-08-01

    Improved recognition of equine geriatric conditions has resulted in a surge in our aged population with a concurrent escalation of many age-related dental pathologies. Prevention of these disorder is the ultimate aim but early identification and appropriate management can increase an animal's oral comfort and maximise its masticatory ability. There is only a finite amount of tooth available for eruption in the horse and therefore as the teeth become worn and less efficient as a grinding unit, dietary modification becomes a paramount consideration to accommodate this. Geriatric animals have differing requirements for restraint and sedation with treatment of coexisting disorders also an important requirement.

  1. Dental Disease in Aged Horses and Its Management.

    PubMed

    Nicholls, Victoria M; Townsend, Neil

    2016-08-01

    Improved recognition of equine geriatric conditions has resulted in a surge in our aged population with a concurrent escalation of many age-related dental pathologies. Prevention of these disorder is the ultimate aim but early identification and appropriate management can increase an animal's oral comfort and maximise its masticatory ability. There is only a finite amount of tooth available for eruption in the horse and therefore as the teeth become worn and less efficient as a grinding unit, dietary modification becomes a paramount consideration to accommodate this. Geriatric animals have differing requirements for restraint and sedation with treatment of coexisting disorders also an important requirement. PMID:27449389

  2. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  3. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  4. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  5. Small Business Microcomputer Programs: Tools for Library Media Center Management.

    ERIC Educational Resources Information Center

    Yerkey, A. Neil

    1984-01-01

    This examination of ways to use general-purpose commercial software to assist in the management of library media centers focuses on database management programs, word processing, authoring systems, and calculator (spreadsheet) programs. System requirements and purchasing information for representative programs (address, price) are provided. Six…

  6. Residue Management: A Computer Program About Conservation Tillage Decisions.

    ERIC Educational Resources Information Center

    Thien, Steve J.

    1986-01-01

    Describes a computer program, Residue Management, which is designed to supplement discussions on the Universal Soil Loss Equation and the impact of tillage on soil properties for introductory soil courses. The program advances the user through three stages of residue management. Information on obtaining the program is also included. (ML)

  7. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Program management responsibilities. 263.16 Section 263.16 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities. (a) Office, Chief of Engineers. Two...

  8. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... management program and entry into the program must be filed within 10 days of the effective date of the...

  9. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... management program and entry into the program must be filed within 10 days of the effective date of the...

  10. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... management program and entry into the program must be filed within 10 days of the effective date of the...

  11. SNL/CA Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  12. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  13. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  14. NRC Research Program on Plant Aging: Listing and summaries of reports issued through September 1993. Revision 4

    SciTech Connect

    Vora, J.P.

    1993-12-01

    The US Nuclear Regulatory Commission is conducting the Nuclear Plant Aging Research (NPAR) Program. This is a comprehensive hardware-oriented engineering research program focused on understanding the aging mechanisms of components and systems in nuclear power plants. The NPAR program also focuses on methods for simulating and monitoring the aging-related degradation of these components and systems. In addition, it provides recommendations for effective maintenance to manage aging and for implementation of the research results in the regulatory process. This document contains a listing and index of reports generated in the NPAR Program that were issued through September 1993 and summaries of those reports. Each summary describes the elements of the research covered in the report and outlines the significant results. For the convenience of the user, the reports are indexed by personal author, corporate author, and subject.

  15. Age Management and Sustainable Careers for the Improvement of the Quality of Ageing at Work.

    PubMed

    Marcaletti, Francesco

    2014-01-01

    Prolonging working careers by increasing the statutory age for retirement has become compulsory in most Western societies in order to tackle the shrinking of the labour force, preserve economic productivity, foster knowledge transfer and reduce the risks of financial imbalances in social security systems. This imperative currently results in working careers that already exceed 40 years and come to an end after the age of 65 (e.g. in Italy). Over the next few decades, both career length and retirement age are expected to rise. Thus, creating more inclusive workplaces by increasing their quality is the precondition of a win-win situation for both employers and employees, regardless of age. A request for support in the development of sustainable careers from both private and public labour organisations has led to innovating the mainstream methodologies and research tools in the field of age management. Based on the key elements of the mainstream "work ability concept" - i.e. health, competencies, motivation and work organisation - the Quality of Ageing at Work questionnaire (QAW-q), developed by a team from the WWELL Research Centre, broadens its perspective by surveying elements bridging intra-organisational dimensions and which affect employees' conditions and external socio-institutional constraints: i.e. work-life balance, economic stability, professional identity and relationships in the workplace. The QAW-q is designed to analyse the influence of the different meanings of age (chronological age, seniority within the company and in the labour market) and correlate them with the different dimensions at individual and organisational levels; all these dimensions are weighted by the effect exerted by the passage of time. The results of the QAW-q survey, taken by employees of both private and public companies, serve as a basis for the implementation of measures addressing all the relevant dimensions of the human resource management cycle.

  16. Age Management and Sustainable Careers for the Improvement of the Quality of Ageing at Work.

    PubMed

    Marcaletti, Francesco

    2014-01-01

    Prolonging working careers by increasing the statutory age for retirement has become compulsory in most Western societies in order to tackle the shrinking of the labour force, preserve economic productivity, foster knowledge transfer and reduce the risks of financial imbalances in social security systems. This imperative currently results in working careers that already exceed 40 years and come to an end after the age of 65 (e.g. in Italy). Over the next few decades, both career length and retirement age are expected to rise. Thus, creating more inclusive workplaces by increasing their quality is the precondition of a win-win situation for both employers and employees, regardless of age. A request for support in the development of sustainable careers from both private and public labour organisations has led to innovating the mainstream methodologies and research tools in the field of age management. Based on the key elements of the mainstream "work ability concept" - i.e. health, competencies, motivation and work organisation - the Quality of Ageing at Work questionnaire (QAW-q), developed by a team from the WWELL Research Centre, broadens its perspective by surveying elements bridging intra-organisational dimensions and which affect employees' conditions and external socio-institutional constraints: i.e. work-life balance, economic stability, professional identity and relationships in the workplace. The QAW-q is designed to analyse the influence of the different meanings of age (chronological age, seniority within the company and in the labour market) and correlate them with the different dimensions at individual and organisational levels; all these dimensions are weighted by the effect exerted by the passage of time. The results of the QAW-q survey, taken by employees of both private and public companies, serve as a basis for the implementation of measures addressing all the relevant dimensions of the human resource management cycle. PMID:26630520

  17. Final Report Inspection of Aged/Degraded Containments Program.

    SciTech Connect

    Naus, Dan J; Ellingwood, B R; Oland, C Barry

    2005-09-01

    The Inspection of Aged/Degraded Containments Program had primary objectives of (1) understanding the significant factors relating corrosion occurrence, efficacy of inspection, and structural capacity reduction of steel containments and liners of reinforced concrete containments; (2) providing the United States Nuclear Regulatory Commission (USNRC) reviewers a means of establishing current structural capacity margins or estimating future residual structural capacity margins for steel containments, and concrete containments as limited by liner integrity; (3) providing recommendations, as appropriate, on information to be requested of licensees for guidance that could be utilized by USNRC reviewers in assessing the seriousness of reported incidences of containment degradation; and (4) providing technical assistance to the USNRC (as requested) related to concrete technology. Primary program accomplishments have included development of a degradation assessment methodology; reviews of techniques and methods for inspection and repair of containment metallic pressure boundaries; evaluation of high-frequency acoustic imaging, magnetostrictive sensor, electromagnetic acoustic transducer, and multimode guided plate wave technologies for inspection of inaccessible regions of containment metallic pressure boundaries; development of a continuum damage mechanics-based approach for structural deterioration; establishment of a methodology for reliability-based condition assessments of steel containments and liners; and fragility assessments of steel containments with localized corrosion. In addition, data and information assembled under this program has been transferred to the technical community through review meetings and briefings, national and international conference participation, technical committee involvement, and publications of reports and journal articles. Appendix A provides a listing of program reports, papers, and publications; and Appendix B contains a listing of

  18. Home-Based Care Program Reduces Disability And Promotes Aging In Place.

    PubMed

    Szanton, Sarah L; Leff, Bruce; Wolff, Jennifer L; Roberts, Laken; Gitlin, Laura N

    2016-09-01

    The Community Aging in Place, Advancing Better Living for Elders (CAPABLE) program, funded by the Center for Medicare and Medicaid Innovation, aims to reduce the impact of disability among low-income older adults by addressing individual capacities and the home environment. The program, described in this innovation profile, uses an interprofessional team (an occupational therapist, a registered nurse, and a handyman) to help participants achieve goals they set. For example, it provides assistive devices and makes home repairs and modifications that enable participants to navigate their homes more easily and safely. In the period 2012-15, a demonstration project enrolled 281 adults ages sixty-five and older who were dually eligible for Medicare and Medicaid and who had difficulty performing activities of daily living (ADLs). After completing the five-month program, 75 percent of participants had improved their performance of ADLs. Participants had difficulty with an average of 3.9 out of 8.0 ADLs at baseline, compared to 2.0 after five months. Symptoms of depression and the ability to perform instrumental ADLs such as shopping and managing medications also improved. Health systems are testing CAPABLE on a larger scale. The program has the potential to improve older adults' ability to age in place. PMID:27605633

  19. Systems approach provides management control of complex programs

    NASA Technical Reports Server (NTRS)

    Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.

    1970-01-01

    Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

  20. PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the Environment Management Division, Directorate of Public Works, Fort Benning, Georgia) Delineator unknown. GARAGES - Fort Benning, Building No. 864, 7325 Miller Loop, Main Post, Fort Benning Military Reservation, Chattahoochee County, GA

  1. Lessons Learned from the Everglades Collaborative Adaptive Management Program

    EPA Science Inventory

    Recent technical papers explore whether adaptive management (AM) is useful for environmental management and restoration efforts and discuss the many challenges to overcome for successful implementation, especially for large-scale restoration programs (McLain and Lee 1996; Levine ...

  2. An Overview of the Space Shuttle Orbiter's Aging Aircraft Program

    NASA Technical Reports Server (NTRS)

    Russell, Richard W.

    2007-01-01

    The Space Shuttle Orbiter has well exceeded its original design life of 10 years or 100 missions. The Orbiter Project Office (OPO) has sponsored several activities to address aging vehicle concerns, including a Corrosion Control Review Board (CCRB), a mid-life certification program, and most recently the formation of the Aging Orbiter Working Group (AOWG). The AOWG was chartered in 2004 as a proactive group which provides the OPO oversight for aging issues such as corrosion, non-destructive inspection, non-metallics, wiring and subsystems. The core team consists of mainly representatives from the Materials and Processes Problem Resolution Team (M&P PRT) and Safety and Mission Assurance (S&MA). Subsystem engineers and subject matter experts are called in as required. The AOWG has functioned by forming issues based sub-teams. Examples of completed sub-teams include adhesives, wiring and wing leading edge metallic materials. Current sub-teams include Composite Over-Wrapped Pressure Vessels (COPV), elastomeric materials and mechanisms.

  3. Learning to Manage: A Program Just for Directors.

    ERIC Educational Resources Information Center

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  4. Successful Management of Public School Capital Improvement Programs.

    ERIC Educational Resources Information Center

    Filardo, Mary

    2000-01-01

    In 1999, the 21st Century School Fund interviewed seven large school districts regarding management of capital-improvement programs. Researchers found three basic models: in-house management, other-public-agency management, and private-sector management. Systematic oversight and quality-control approaches will protect school systems from…

  5. The Stealth Gerontologytm Program[TM]: Training Teachers to Infuse Aging and Age-Related Content into Public School Classrooms

    ERIC Educational Resources Information Center

    Pruski, Linda A.; Plaetke, Rosemarie; Blalock, Cheryl L.; Marshall, Carolyn E.; Lichtenstein, Michael J.

    2004-01-01

    Preparing youngsters for an aging society requires teachers who keep pace with health science research. The Stealth Gerontology[TM] program educates teachers regarding aging-related issues. The design and assessment of the program are reported in this paper. Teachers attended sessions including direct instruction and hands-on participation (e.g.,…

  6. The Stealth Gerontology [TM] Program: Training Teachers to Infuse Aging and Age-Related Content into Public School Classrooms

    ERIC Educational Resources Information Center

    Pruski, Linda A.; Plaetke, Rosemarie; Cheryl L.; Marshall, Carolyn E.; Lichtenstein, Michael J.

    2004-01-01

    Preparing youngsters for an aging society requires teachers who keep pace with health science research. The Stealth Gerontology [TM] program educates teachers regarding aging-related issues. The design and assessment of the program are reported in this paper. Teachers attended sessions including direct instruction and hands-on participation (e.g.,…

  7. SNL/CA Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  8. The (safety-related) heat exchangers aging management guideline for commercial nuclear power plants, and developments since 1994

    SciTech Connect

    Clauss, J.M.

    1998-08-01

    The US Department of Energy (DOE), in cooperation with the Electric Power Research Institute (EPRI) and US nuclear power plant utilities, is preparing a series of aging management guidelines (AMGs) for commodity types of components (e.g., heat exchangers, electrical cable and terminations, pumps). Commodities are included in this series based on their importance to continued nuclear plant operation and license renewal. The AMGs contain a detailed summary of operating history, stressors, aging mechanisms, and various types of maintenance and surveillance practices that can be combined to create an effective aging management program. Each AMG is intended for use by the systems engineers and plant maintenance staff (i.e., an AMG is intended to be a hands-on technical document rather than a licensing document). The heat exchangers AMG, published in June 1994, includes the following information of interest to nondestructive examination (NDE) personnel: aging mechanisms determined to be non-significant for all applications; aging mechanisms determined to be significant for some applications; effective conventional programs for managing aging; and effective unconventional programs for managing aging. Since the AMG on heat exchangers was published four years ago, a brief review has been conducted to identify emerging regulatory issues, if any. The results of this review and lessons learned from the collective set of AMGs are presented.

  9. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1995 annual report.

    SciTech Connect

    Young, Franklin R.

    1997-04-01

    Report on progress on evaluation of the Columbia River Northern Squawfish Management Program in 1995. The objectives in 1995 were to (1) evaluate exploitation rate and size composition of northern squawfish captured in various fisheries, and estimate reductions in predation on juvenile salmonids since implementation of the Northern Squawfish Management Program; and (2) evaluate changes through 1995 in relative abundance, consumption, size and age structure, growth, and fecundity of northern squawfish in lower Columbia and Snake River reservoirs and in the Columbia River downstream from Bonneville Dam.

  10. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1994 Annual Report.

    SciTech Connect

    Young, Franklin R.; Willis, Charles F.

    1995-09-01

    Report on the progress on evaluation of the Northern Squawfish Management Program in 1994. The objectives in 1994 were to (1) evaluate exploitation rate, size composition, and incidental catch of northern squawfish (Ptychocheilus oregonensis) captured in the various fisheries and estimate reductions in predation on juvenile salmonids since implementation of the management program, and (2) evaluate changes through 1994 in relative abundance, smolt consumption rate, size and age structure, growth, and fecundity of northern squawfish in lower Columbia and Snake River reservoirs and the Columbia River downstream from Bonneville Dam.

  11. Recommendations for improvements to program and project management

    SciTech Connect

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  12. Interest in a Twitter-delivered weight loss program among women of childbearing age.

    PubMed

    Waring, Molly E; Schneider, Kristin L; Appelhans, Bradley M; Simas, Tiffany A Moore; Xiao, Rui S; Whited, Matthew C; Busch, Andrew M; Evans, Martinus M; Pagoto, Sherry L

    2016-06-01

    Weight management through the childbearing years is important, yet few women have access to efficacious weight loss programs. Online social network-delivered programs may increase reach and thus impact. The aim of this study was to gauge interest in a Twitter-based weight loss intervention among women of childbearing age and the feasibility of recruitment via Twitter. We recruited English-speaking women aged 18-45 years (N = 63) from Twitter to complete an anonymous online survey including open-ended questions about program advantages and concerns. Forty percent of participants were obese and 83 % were trying to lose weight. Eighty-one percent were interested in a Twitter-delivered weight loss program. Interest was high in all subgroups (62-100 %). Participants (59 %) cited program advantages, including convenience, support/accountability, and privacy. Concerns (59 %) included questions about privacy, support/accountability, engagement, efficacy, and technology barriers. Research is needed to develop and evaluate social media-delivered interventions, and to develop methods for recruiting participants directly from Twitter. PMID:27356998

  13. Interest in a Twitter-delivered weight loss program among women of childbearing age.

    PubMed

    Waring, Molly E; Schneider, Kristin L; Appelhans, Bradley M; Simas, Tiffany A Moore; Xiao, Rui S; Whited, Matthew C; Busch, Andrew M; Evans, Martinus M; Pagoto, Sherry L

    2016-06-01

    Weight management through the childbearing years is important, yet few women have access to efficacious weight loss programs. Online social network-delivered programs may increase reach and thus impact. The aim of this study was to gauge interest in a Twitter-based weight loss intervention among women of childbearing age and the feasibility of recruitment via Twitter. We recruited English-speaking women aged 18-45 years (N = 63) from Twitter to complete an anonymous online survey including open-ended questions about program advantages and concerns. Forty percent of participants were obese and 83 % were trying to lose weight. Eighty-one percent were interested in a Twitter-delivered weight loss program. Interest was high in all subgroups (62-100 %). Participants (59 %) cited program advantages, including convenience, support/accountability, and privacy. Concerns (59 %) included questions about privacy, support/accountability, engagement, efficacy, and technology barriers. Research is needed to develop and evaluate social media-delivered interventions, and to develop methods for recruiting participants directly from Twitter.

  14. Improving Voluntary Environmental Management Programs: Facilitating Learning and Adaptation

    NASA Astrophysics Data System (ADS)

    Genskow, Kenneth D.; Wood, Danielle M.

    2011-05-01

    Environmental planners and managers face unique challenges understanding and documenting the effectiveness of programs that rely on voluntary actions by private landowners. Programs, such as those aimed at reducing nonpoint source pollution or improving habitat, intend to reach those goals by persuading landowners to adopt behaviors and management practices consistent with environmental restoration and protection. Our purpose with this paper is to identify barriers for improving voluntary environmental management programs and ways to overcome them. We first draw upon insights regarding data, learning, and adaptation from the adaptive management and performance management literatures, describing three key issues: overcoming information constraints, structural limitations, and organizational culture. Although these lessons are applicable to a variety of voluntary environmental management programs, we then present the issues in the context of on-going research for nonpoint source water quality pollution. We end the discussion by highlighting important elements for advancing voluntary program efforts.

  15. The CREp program, a fully parameterizable program to compute exposure ages (3He, 10Be)

    NASA Astrophysics Data System (ADS)

    Martin, L.; Blard, P. H.; Lave, J.; Delunel, R.; Balco, G.

    2015-12-01

    Over the last decades, cosmogenic exposure dating permitted major advances in Earth surface sciences, and particularly in paleoclimatology. Yet, exposure age calculation is a dense procedure. It requires numerous choices of parameterization and the use of an appropriate production rate. Nowadays, Earth surface scientists may either calculate exposure ages on their own or use the available programs. However, these programs do not offer the possibility to include all the most recent advances in Cosmic Ray Exposure (CRE) dating. Notably, they do not propose the most recent production rate datasets and they only offer few possibilities to test the impact of the atmosphere model and the geomagnetic model on the computed ages. We present the CREp program, a Matlab © code that computes CRE ages for 3He and 10Be over the last 2 million years. The CREp program includes the scaling models of Lal-Stone in the "Lal modified" version (Balco et al., 2008; Lal, 1991; Stone, 2000) and the LSD model (Lifton et al., 2014). For any of these models, CREP allows choosing between the ERA-40 atmosphere model (Uppala et al., 2005) and the standard atmosphere (National Oceanic and Atmospheric Administration, 1976). Regarding the geomagnetic database, users can opt for one of the three proposed datasets: Muscheler et al. 2005, GLOPIS-75 (Laj et al. 2004) and the geomagnetic framework proposed in the LSD model (Lifton et al., 2014). They may also import their own geomagnetic database. Importantly, the reference production rate can be chosen among a large variety of possibilities. We made an effort to propose a wide and homogenous calibration database in order to promote the use of local calibration rates: CREp includes all the calibration data published until July 2015 and will be able to access an updated online database including all the newly published production rates. This is crucial for improving the ages accuracy. Users may also choose a global production rate or use their own data

  16. Managing environmental information in the age of outsourcing.

    SciTech Connect

    Perkins, S.; Smith, K.; Whorton, M.; Williams, G.

    1999-03-08

    As more data gathering, analysis, and tracking tasks are outsourced the need for multiple contractors and military personnel to input, update, access, store, and track Mormation is becoming critical to efficient functioning and managing of environmental projects and programs at military installations. This paper presents two case studies detailing the way two organizations--the Rocky Mountain Arsenal (RMA) in Colorado, and the 611th Air Support Group (611 ASG) in Alaska--are managing complex data using web-based technology. RMA is involved in one of the largest environmental cleanup programs in the Department of Defense. As such, large volumes of environmental data and documents must be generates stored, and tracked. Often these documents are prepared by multiple contractors and are reviewed by several parties or groups. To manage environmental information and to ensure that it meets compliance requirements more efficiently, RMA has developed an electronic document tracking and distribution system. This system allows access to up-to-date information, including a detailed review of all pertinent regulatory and other requirements at RMA. The dynamic system includes milestones, review deadlines, submission deadlines, and other requirements for managing the environmental program. The 611 ASG manages more than 30 remote installations in Alaska, many of which are operated by contractor personnel. These installations contain hundreds of buildings that are constantly being modified because of exposure to harsh arctic climates; some of them have been determined to be eligible for the National Register of Historic Places. To meet regulatory requirements for cultural resources management as well as engineering requirements for upkeep of buildings, a database was developed to store and analyze building data. The database has a web-based interface that allows anyone with the correct access codes to input new data, modify existing data, or query the database using a number of

  17. Disease management programs for CKD patients: the potential and pitfalls.

    PubMed

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  18. Effects of Age on the Detection and Management of Breast Cancer

    PubMed Central

    McGuire, Andrew; Brown, James A. L.; Malone, Carmel; McLaughlin, Ray; Kerin, Michael J.

    2015-01-01

    Currently, breast cancer affects approximately 12% of women worldwide. While the incidence of breast cancer rises with age, a younger age at diagnosis is linked to increased mortality. We discuss age related factors affecting breast cancer diagnosis, management and treatment, exploring key concepts and identifying critical areas requiring further research. We examine age as a factor in breast cancer diagnosis and treatment relating it to factors such as genetic status, breast cancer subtype, hormone factors and nodal status. We examine the effects of age as seen through the adoption of population wide breast cancer screening programs. Assessing the incidence rates of each breast cancer subtype, in the context of age, we examine the observed correlations. We explore how age affects patient’s prognosis, exploring the effects of age on stage and subtype incidence. Finally we discuss the future of breast cancer diagnosis and treatment, examining the potential of emerging tests and technologies (such as microRNA) and how novel research findings are being translated into clinically relevant practices. PMID:26010605

  19. Jamaica: a middle-aged program searches for new horizons.

    PubMed

    1984-01-01

    The advertising and marketing consultant for Jamaica's Commercial Distribution of Contraceptives (JCDC) program, states that the program has reached a state of maturity that has resulted in some inertia. Although still the leader among contraceptive social marketing (CSM) programs in reaching the greatest percentage of its target market, product sales are no longer on an upswing, and retail outlets are not increasing in number. The project is hoping that the introduction of a new thin condom can help, but more than 1 new product may be needed to recapture momentum. The JCDC began in 1974 when Westinghouse Health Systems won a 3 year Agency for International Development (AID) award to create a Jamaican CSM program. Challenges facing the new social marketing project included: oral contraceptives (OCs) were sold only by prescription; most pharmacies were located in urban areas; many consumers associated condoms with prostitution and disease; and retailers were reluctant to carry contraceptives and ignorant of OC side effects. The 1st breakthrough came when Westinghouse obtained government permission to sell a project pill without prescription. After market research, project managers chose the name "Perle" for the JCDC's pill, manufactured in the US by Syntex as Noriday. "Panther" became the project's condom. Prices were set at US17 cents for a Panther 3-pack and 34 cents for a Perle cycle. Advertising messages appeared on television, radio, bus shelters, cinema screens, billboards, and point of purchase displays. By the end of the 1st year's sales, a soft goods manufacturer had asked permission to produce Panther T-shirts and a Reggae composer had popularized songs about the product. Such promotional tactics boosted sales of all contraceptives on the island. About 690,000 Panther condoms and 450,000 other brands were sold in 1976; 195,000 Perle cycles were purchased compared with 135,000 cycles for all other brands combined. By 1977, Westinghouse was reducing

  20. Paper and Process: How Youth Programs Manage Program Intake, Individual Service Strategy Development, and Case Files.

    ERIC Educational Resources Information Center

    Callahan, Jim; McLaughlin, Brenda

    This guide presents information and materials to help youth programs manage program intake, design an individual service strategy (ISS) as mandated in the Workforce Investment Act, and manage case files. The materials are based on information obtained from staff working in seven successful youth workforce investment programs in Maryland,…

  1. An Aging Interventions Testing Program: study design and interim report.

    PubMed

    Miller, Richard A; Harrison, David E; Astle, Clinton M; Floyd, Robert A; Flurkey, Kevin; Hensley, Kenneth L; Javors, Martin A; Leeuwenburgh, Christiaan; Nelson, James F; Ongini, Ennio; Nadon, Nancy L; Warner, Huber R; Strong, Randy

    2007-08-01

    The National Institute on Aging's Interventions Testing Program (ITP) has developed a plan to evaluate agents that are considered plausible candidates for delaying rates of aging. Key features include: (i) use of genetically heterogeneous mice (a standardized four-way cross), (ii) replication at three test sites (the Jackson Laboratory, TJL; University of Michigan, UM; and University of Texas, UT), (iii) sufficient statistical power to detect 10% changes in lifespan, (iv) tests for age-dependent changes in T cell subsets and physical activity, and (v) an annual solicitation for collaborators who wish to suggest new interventions for evaluation. Mice in the first cohort were exposed to one of four agents: aspirin, nitroflurbiprofen (NFP), 4-OH-alpha-phenyl-N-tert-butyl nitrone (4-OH-PBN), or nordihydroguiaretic acid (NDGA). An interim analysis was conducted using survival data available on the date at which at least 50% of the male control mice had died at each test site. Survival of control males was significantly higher, at the interim time-point, at UM than at UT or TJL; all three sites had similar survival of control females. Males in the NDGA group had significantly improved survival (P = 0.0004), with significant effects noted at TJL (P < 0.01) and UT (P < 0.04). None of the other agents altered survival, although there was a suggestion (P = 0.07) of a beneficial effect of aspirin in males. More data will be needed to determine if any of these compounds can extend maximal lifespan, but the current data show that NDGA reduces early life mortality risks in genetically heterogeneous mice at multiple test sites.

  2. Effects of age on physiological and psychological functioning among COPD patients in an exercise program.

    PubMed

    Emery, C F

    1994-02-01

    Older adults with chronic illness may be at greater risk of psychological distress than healthy older adults. This study examined the effect of age on physiological and psychological functioning of exercising older adults with chronic obstructive pulmonary disease (COPD). Sixty-four older adults (mean age = 67.4 plus or minus 7.0; 35 male, 29 female) with COPD were included in the study. All subjects participated in a 30-day rehabilitation program consisting of exercise (walking, stationary bicycle, pool exercises), education, and stress management. Subjects underwent assessments of physiological functioning (e.g., bicycle ergometry,12-minute walk), cognitive status (e.g., memory, psychomotor speed, concentration), and psychological well-being (e.g., anxiety, depression, psychiatric symptoms) before and after the exercise program. Results were analyzed by repeated measures multivariate analysis of variance, with age (median split = 67.5 years) as a between-subject factor. Although the exercise program appeared to have a greater effect on physiological functioning and on concentration and short-term memory of younger-old subjects, both groups of subjects achieved gains in physiological functioning, and psychological well-being.

  3. 14 CFR § 1214.1706 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Program management. § 1214.1706 Section § 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  4. Export Management Specialist. A Training Program. Instructor's Edition.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This publication provides instructors with materials for an export management specialist (EMS) training program. The objective of the training program is to assist companies in reaching their export goals by educating current and potential managers about the basics of exporting. It provides a foundation for considering international trade and for…

  5. 76 FR 42536 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... System Management Information Program on November 8, 2010, at 75 FR 68418. The final rule document also... Federal Highway Administration 23 CFR Part 511 RIN 2125-AF19 Real-Time System Management Information... available and share traffic and travel conditions information via real-time information programs as...

  6. 75 FR 4098 - Section 8 Management Assessment Program (SEMAP) Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... URBAN DEVELOPMENT Section 8 Management Assessment Program (SEMAP) Certification AGENCY: Office of the... performance in administering a housing choice voucher program. Assessment ratings are used as tool in.... This notice also lists the following information: Title of Proposal: Section 8 Management...

  7. Exercise Clothing for Children in a Weight-Management Program

    ERIC Educational Resources Information Center

    Carroll, Kate; Alexander, Marina; Spencer, Virginia

    2007-01-01

    This study investigated whether clothing can be perceived as a form of encouragement for success in a weight management exercise program. A small (n = 30) sample of children and parents, enrolled in a weight-management exercise program, responded to a survey instrument that included questions regarding fit and comfort of the clothing children wore…

  8. Developing Higher Education Programs in Emergency Management: Ghana's Experience

    ERIC Educational Resources Information Center

    Yakubu, Mariama Bisongu

    2013-01-01

    Ghana is highly vulnerable and threatened by several hazards and has sought ways of minimizing impacts of hazards events over time including demonstrating an interest in developing an emergency management training and an higher education degree program. Yet, as of 2013, the country has not developed a disaster management training program or a…

  9. 18 CFR 141.500 - Cash management programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Cash management programs. 141.500 Section 141.500 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... agreements with the Commission. The documentation establishing the cash management program and entry into...

  10. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management programs. 357.5 Section 357.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... the Commission. The documentation establishing the cash management program and entry into the...

  11. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Cash management programs. 357.5 Section 357.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... the Commission. The documentation establishing the cash management program and entry into the...

  12. 18 CFR 141.500 - Cash management programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Cash management programs. 141.500 Section 141.500 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... agreements with the Commission. The documentation establishing the cash management program and entry into...

  13. 18 CFR 141.500 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management programs. 141.500 Section 141.500 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... agreements with the Commission. The documentation establishing the cash management program and entry into...

  14. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Cash management programs. 357.5 Section 357.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... the Commission. The documentation establishing the cash management program and entry into the...

  15. CRC handbook of management of radiation protection programs

    SciTech Connect

    Miller, K.L.; Weider, W.A.

    1985-01-01

    This volume details the organization and management of radiation safety programs, including both preventive and emergency response measures. Included are guidelines and checklists for managing radioactive waste processing programs, dealing with litigation, and responding to public or news media concerns. The last sections list state, federal, and international requirements for transportation of radioactive materials.

  16. Behavior Management for School Aged Children with ADHD

    PubMed Central

    Pfiffner, Linda J.; Haack, Lauren M.

    2014-01-01

    Synopsis Behavior management treatments are the most commonly used nonpharmacological approaches for treating ADHD and associated impairments. This review focuses on behavioral parent training interventions for school age children in the home setting and adjunctive treatments developed to extend effects across settings. The underlying theoretical basis and content of these interventions are described. Empirical support includes numerous randomized clinical trials, systematic reviews, and meta-analyses showing positive effects of these interventions on child compliance, ADHD symptoms and impairments, parent-child interactions, parenting and parenting stress. These studies support categorization of behavior management treatment as a well-established, evidence-based treatment for ADHD. Factors for consideration in clinical decision-making and future directions for research are provided. PMID:25220083

  17. Musculoskeletal Disease in Aged Horses and Its Management.

    PubMed

    van Weeren, Paul René; Back, Willem

    2016-08-01

    Musculoskeletal disorders are the most prevalent health problem in aging horses. They are not life threatening, but are painful and an important welfare issue. Chronic joint disease (osteoarthritis) and chronic laminitis are the most prevalent. Treating osteoarthritis in the elderly horse is similar to treating performance horses, but aims at providing a stable situation with optimal comfort. Immediate medical treatment of flare-ups, long-term pain management, and adaptation of exercise and living conditions are the mainstays of treatment. Laminitis in the geriatric horse is related often to pituitary pars intermedia dysfunction, which may be treated with additional pergolide. PMID:27449390

  18. Sandia National Laboratories, California Chemical Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  19. Early Thymus Involution--Manifestation of an Aging Program or a Program of Development?

    PubMed

    Khalyavkin, A V; Krut'ko, V N

    2015-12-01

    "I see no physical reason why it should not have been possible for life to construct ageless individuals", said Carl von Weizsacker in 1979 at the Conference on DNA. An obvious biological reason for senescence may be the action of a built-in aging program. Many gerontologists believe that early thymic involution is an argument in favor of the existence of such a program. On the other hand, this involution may be a result of the program of development rather than aging. According to the concepts of noninfectious immunology, the immune system of vertebrates is also designed for immune surveillance over initial tumor development and for tissue-specific regulation of cell proliferation both in ontogenesis and during physiological and reparative regeneration of organs and tissues. Natural anti-tissue autoantibodies are the main effectors of such regulation. Therefore, the number of inherited genes of the variable part of immunoglobulin (V-genes) is not less than the number of all proliferative-competent cell types (~100). For the same reason, the maximal rate of growth, which is usually observed in the prepubertal period, coincides with the maximal thymus index and the maximal number of immunoglobulin-secreting cells as well as the minimal force of mortality during ontogeny. Thus, the circa-pubertal beginning of thymic involution is probably caused by the programmed deceleration of the growth rate in ontogeny, and not by the early manifestation of an aging program. This approach allows us to understand the mechanism of the well-known antitumor effect of the regeneration process of the organ homologous to the tumor, and hence we can try to use it in practical oncology. PMID:26638688

  20. Increasing access and support for emergency management higher education programs.

    PubMed

    Cwiak, Carol L

    2014-01-01

    The number of emergency management higher education programs has grown dramatically since 1994 when the FEMA Higher Education Program was created to propagate and support such growth. Data collected annually since 2007 from emergency management higher education programs shows that these programs face some consistent challenges. These challenges were coupled with annual data on program access and support indicators via dimensional analysis to answer the questions: To what extent are the challenges linked to a lack of access or support? If there is linkage, what can be gleaned from these linkages that can help address the challenges through improving access and support? The analysis showed that lack of access to funding and resources, and lack of support from partner organizations, has an impact on emergency management higher education. Discussion of that impact is followed with detailed recommendations that are focused on strengthening both internal and external access and support relationships for emergency management higher education programs.

  1. Structural Aging Program technical progress for period, January 1, 1992--December 31, 1992

    SciTech Connect

    Naus, D.J.; Oland, C.B.

    1993-07-01

    The Structural Aging (SAG) Program is conducted for the Nuclear Regulatory Commission (NRC) by the Oak Ridge National Laboratory (ORNL). The program has the overall objective of preparing an expandable handbook or report which will provide potential structural safety issues and acceptance criteria for use by the NRC in nuclear power plant evaluations of continued service. Initial focus of the program is on concrete and concrete-related materials which comprise safety-related (Category I) structures in light-water reactor facilities. The SAG Program is organized into four tasks: Task S.1 -- Program Management, Task S.2 -- Materials Property Data Base, Task S.3 -- Structural Component Assessment/Repair Technology, and Task S.4 -- Quantitative Methodology for Continued Service Determinations. In meeting the individual objectives of these tasks resources are drawn from ORNL with subcontract support from universities and other research laboratories. This report provides an overview of principal developments in each of the four program tasks from January 1, 1992 to December 31, 1992. Planned activities under each of these tasks are also presented.

  2. Pilot Enhancement of the Arthritis Foundation Exercise Program with a Healthy Aging Program.

    PubMed

    Schlenk, Elizabeth A; Bilt, Joni Vander; Lo-Ciganic, Wei-Hsuan; Jacob, Mini E; Woody, Sarah E; Conroy, Molly B; Kwoh, C Kent; Albert, Steven M; Boudreau, Robert; Newman, Anne B; Zgibor, Janice C

    2016-05-01

    Older adults with arthritis or joint pain were targeted for a pilot program enhancing the Arthritis Foundation Exercise Program with the 10 Keys™ to Healthy Aging Program. Using a one-group, pre-post design, feasibility was examined and improvements in preventive behaviors, arthritis outcomes, and cardiometabolic outcomes were explored. A 10-week program was developed, instructors were recruited and trained, and four sites and 51 participants were recruited. Measures included attendance, adherence, satisfaction, preventive behaviors, Western Ontario and McMaster Universities Osteoarthritis Index (pain and stiffness), glucose, and cholesterol. Three fourths of participants attended >50% of the sessions. At 6 and 12 months, more than one half performed the exercises 1 to 2 days per week, whereas 28% and 14% exercised 3 to 7 days per week, respectively. Participants (92%) rated the program as excellent/very good. Nonsignificant changes were observed in expected directions. Effect sizes were small for arthritis and cardiometabolic outcomes. This program engaged community partners, demonstrated feasibility, and showed improvements in some preventive behaviors and health risk profiles. [Res Gerontol Nurs. 2016; 9(3):123-132.].

  3. Children's Fitness. Managing a Running Program.

    ERIC Educational Resources Information Center

    Hinkle, J. Scott; Tuckman, Bruce W.

    1987-01-01

    A running program to increase the cardiovascular fitness levels of fourth-, fifth-, and sixth-grade children is described. Discussed are the running environment, implementation of a running program, feedback, and reinforcement. (MT)

  4. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  5. Management philosophies as applied to major NASA programs

    NASA Technical Reports Server (NTRS)

    Dannenberg, K. K.

    1974-01-01

    A definition of 'management philosophies' is discussed explaining the position of NASA in the planning and control of space programs and technology. The impact of these philosophies on the Apollo and Saturn 1 programs are described along with the need for the Saturn 5 spacecraft and launch site development. Case studies are included and describe unscheduled events where management decisions were necessary to keep programs on track.

  6. Assurance management program for the 30 Nova laser fusion project

    SciTech Connect

    Levy, A.J.

    1983-11-30

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project.

  7. Management Development and Training Program for Colleges and Universities. Program Handbook, May 1978.

    ERIC Educational Resources Information Center

    Higher Education Management Inst., Coconut Grove, FL.

    A Management Development and Training Program has been developed by the Higher Education Management Institute to improve the overall functioning of higher education organizations. The Institute believes management development and training can: add to individuals' knowledge and skills, increase awareness of management processes and systems;…

  8. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 12 2014-10-01 2014-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  9. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  10. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 12 2013-10-01 2013-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  11. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  12. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  13. Laboratory Resources Management in Manufacturing Systems Programs

    ERIC Educational Resources Information Center

    Obi, Samuel C.

    2004-01-01

    Most, if not all, industrial technology (IT) programs have laboratories or workshops. Often equipped with modern equipment, tools, materials, and measurement and test instruments, these facilities constitute a major investment for IT programs. Improper use or over use of program facilities may result in dirty lab equipment, lost or damaged tools,…

  14. The Impact of a Telephone-Based Chronic Disease Management Program on Medical Expenditures

    PubMed Central

    Talens, Sheila

    2016-01-01

    Abstract The impact of a payer-provided telephone-based chronic disease management program on medical expenditures was evaluated using claims data from 126,245 members in employer self-ensured health plans (16,224 with a chronic disease in a group enrolled in the self-management program, 13,509 with a chronic disease in a group not participating in the program). A random effects regression model controlling for retrospective risk, age, sex, and diagnosis with a chronic disease was used to determine the impact of program participation on market-adjusted health care expenditures. Further confirmation of results was obtained by an ordinary least squares model comparing market- and risk-adjusted costs to the length of participation in the program. Participation in the program is associated with an average annual savings of $1157.91 per enrolled member in health care expenditures. Savings increase with the length of participation in the program. The results support the use of telephone-based patient self-management of chronic disease as a cost-effective means to reduce health care expenditures in the working-age population. (Population Health Management 2016;19:156–162) PMID:26348843

  15. The Impact of a Telephone-Based Chronic Disease Management Program on Medical Expenditures.

    PubMed

    Avery, George; Cook, David; Talens, Sheila

    2016-06-01

    The impact of a payer-provided telephone-based chronic disease management program on medical expenditures was evaluated using claims data from 126,245 members in employer self-ensured health plans (16,224 with a chronic disease in a group enrolled in the self-management program, 13,509 with a chronic disease in a group not participating in the program). A random effects regression model controlling for retrospective risk, age, sex, and diagnosis with a chronic disease was used to determine the impact of program participation on market-adjusted health care expenditures. Further confirmation of results was obtained by an ordinary least squares model comparing market- and risk-adjusted costs to the length of participation in the program. Participation in the program is associated with an average annual savings of $1157.91 per enrolled member in health care expenditures. Savings increase with the length of participation in the program. The results support the use of telephone-based patient self-management of chronic disease as a cost-effective means to reduce health care expenditures in the working-age population. (Population Health Management 2016;19:156-162).

  16. The San Francisco Joint Institutional Transportation Systems Management Program.

    ERIC Educational Resources Information Center

    Fink, Ira; LaPointe, Robert

    1981-01-01

    Transportation systems management (TSM) programs are discussed, particularly the 1977 program of the University of California, San Francisco, which led to traffic reduction and improved vehicle flow. The city's implementation plan for a similar TSM program for 14 educational institutions and hospitals is described. (MLW)

  17. Can weight management programs in worksites reduce the obesity epidemic?

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Worksites can potentially be important locations for weight management programs that contribute to curbing the national obesity epidemic. In published studies, weight loss programs targeting overweight and obese employees have been relatively more effective for weight loss than programs for preventi...

  18. Management Education Program Evaluation: An Empirical Study in Mainland China

    ERIC Educational Resources Information Center

    Sou, Gryphon; Zhou, Pinqiu

    2007-01-01

    Background: With the accession of the PRC to the WTO, Chinese education market is open to the educational service providers of the foreign countries. They are keen to offer MBA Degree programs to the Career Managers in the Mainland. Aims: This research studies program evaluation and so forth the quality assessment of a MBA degree program in the…

  19. Parent Interest in a School-Based, School Nurse-Led Weight Management Program

    ERIC Educational Resources Information Center

    Kubik, Martha Y.; Lee, Jiwoo

    2014-01-01

    Because one in three children is already overweight or obese, school-based interventions targeting secondary obesity prevention merit consideration. This study assessed parent interest in participating in a school-based, school nurse-led weight management program for young school-aged children. A random sample of parents ("n" = 122) of…

  20. Regulatory instrument review: Aging management of LWR cables, containment and basemat, reactor coolant pumps, and motor-operated valves

    SciTech Connect

    Werry, E.V.; Somasundaram, S.

    1995-09-01

    The results of Stage 2 of the Regulatory Instrument Review are presented in this volume. Selected regulatory instruments, such as the Code of Federal Regulations (CFR), US Nuclear Regulatory Commission (NRC), Regulatory Guides, and ASME Codes, were investigated to determine the extent to which these regulations apply aging management to selected safety-related components in nuclear power plants. The Regulatory Instrument Review was funded by the NRC under the Nuclear Plant Aging Research (NPAR) program. Stage 2 of the review focused on four safety-related structures and components; namely, cables, containment and basemat, reactor coolant pumps, and motor-operated valves. The review suggests that the primary-emphasis of the regulatory instruments was on the design, construction, start-up, and operation of a nuclear power plant, and that aging issues were primarily addressed after an aging-related problem was recognized. This Stage 2 review confirms the results of the prior review; (see Regulatory Instrument Review: Management of Aging of LWR Major Safety-Related Components NUREG/CR-5490. The observations indicate that the regulations generally address management of age-related degradation indirectly. Specific age-related degradation phenomena frequently are dealt with in bulletins and notices or through generic issues, letters, etc. The major recommendation of this report, therefore, is that the regulatory instruments should more directly and explicitly address the aging phenomenon and the management of the age-related degradation process.

  1. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  2. Efficient management of cardiovascular risk screening programs

    NASA Technical Reports Server (NTRS)

    Roth, Carol

    1993-01-01

    The Environmental Health Unit, located on-site at the the Goddard Space Flight Center (GSFC), is responsible for the implementation of the Center's Employee Environmental and Occupational Health Program. The Health Unit, Health Physics (HP), and Industrial Hygiene (IH) staffs collaborate to provide quality service to the employees at GSFC. The Health Unit staff identifies, evaluates, and ensures the control of occupational hazards on the Center. In the past, components of the Industrial Hygiene Program have included the Industrial Hygiene Health Hazard Identification Program (IHHIP), the Hearing Conservation Program (HCP), the Hazard Communication Program, and the bi-annual fume hood survey. More recently, the Environmental Health Unit has expanded its services by adding the Ergonomics Program. Various aspects of the Ergonomics Program are discussed.

  3. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  4. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes. PMID:15682672

  5. Wastewater management through the ages: a history of mankind.

    PubMed

    Lofrano, Giusy; Brown, Jeanette

    2010-10-15

    Although much has been written about the history of water supply systems, there is a lack of corresponding information on wastewater management. This is surprising since the lack of sanitation affects human development to the same or even greater extent as the lack of clean water. While there may be an added stigma to discussing waste treatment, sanitation is widely perceived as meriting a significant claim on financial and political resources as well on the evolution of mankind. A literature review is presented on the evolution of wastewater management through the ages and its concurrent impact on human health and environment. Hopefully this information will improve the awareness of the past with a view to impacting future policies and technical developments. The review highlights the connection of environmental contamination with the ability to measure it, as well as the ways pollution control has been changed by advances in scientific knowledge. Attention is also drawn to the effects of political and societal events on wastewater management. A sanitation timeline has been constructed pointing out significant developments in the treatment of wastewater and improvements in analytical environmental chemistry. This review has been written in the belief that historical research showing the collective experience and "philosophy of sanitation" can provide inspiration to face future challenges.

  6. The Effects of Self-Management Education for School-Age Children on Asthma Morbidity: A Systematic Review

    ERIC Educational Resources Information Center

    Ahmad, Emily; Grimes, Deanna E.

    2011-01-01

    The effects of asthma self-management education for school-age children on number of school days missed, emergency department visits and hospital admissions were evaluated through a systematic review of the published research. A total of 9 studies on asthma education programs that were conducted in schools by school nurses and health educators and…

  7. Preparing health care organizations for successful case management programs.

    PubMed

    Bonvissuto, C A; Kastens, J M; Atwell, S R

    1997-01-01

    This article reports the results of a study of four hospital-based providers in varying stages of implementing case management programs. Three of the providers had most of the necessary elements in place to ensure success, such as a mix of reimbursement sources, an effective and integrated information management system, a full range of clinical services, and continuous quality improvement programs. The authors make several suggestions for key activities that must be pursued by any health care organization seeking to implement a case management program in an era of managed care, tightening reimbursement, and consumer demand for quality care. These include the need to (a) organize essential case management functions under a centralized structure; (b) set realistic, quantifiable targets, and (c) design a communications plan for the program. PMID:9335724

  8. Preparing health care organizations for successful case management programs.

    PubMed

    Bonvissuto, C A; Kastens, J M; Atwell, S R

    1997-01-01

    This article reports the results of a study of four hospital-based providers in varying stages of implementing case management programs. Three of the providers had most of the necessary elements in place to ensure success, such as a mix of reimbursement sources, an effective and integrated information management system, a full range of clinical services, and continuous quality improvement programs. The authors make several suggestions for key activities that must be pursued by any health care organization seeking to implement a case management program in an era of managed care, tightening reimbursement, and consumer demand for quality care. These include the need to (a) organize essential case management functions under a centralized structure; (b) set realistic, quantifiable targets, and (c) design a communications plan for the program.

  9. Bank One's worksite-based asthma disease management program.

    PubMed

    Burton, W N; Connerty, C M; Schultz, A B; Chen, C Y; Edington, D W

    2001-02-01

    Non-occupational asthma is a common disease affecting approximately 6% of the US population. Asthma accounts for an estimated 3 million workdays lost each year in the United States and for reduced employee job productivity. Although asthma disease management programs are relatively common in managed care organizations, they generally have not been offered at the workplace. A total of 168 employees with asthma were identified, and 76 participated in a worksite asthma disease management program. Of them, 41 (53.9%) completed an Asthma Therapy Assessment Questionnaire (ATAQ) at baseline, post-program (2 months), 4 months, and 12 months. The total ATAQ Index declined from 3.59 at baseline to 2.76 at 12 months (p < 0.01). After the program, significantly more employees reported using controller medications (the desired behavior) rather than reliever medications. A worksite-based disease management program for asthma should reduce medical care costs and absenteeism and improve worker productivity.

  10. Evaluation of a Training Program in Aging Research for Social Work Faculty

    ERIC Educational Resources Information Center

    Mehrotra, Chandra M.; Townsend, Aloen; Berkman, Barbara

    2013-01-01

    Since 2004, we have offered a postgraduate training program in aging research for social work faculty from across the country. The overarching goal of the program is to expand the pool of social work faculty engaged in aging research. This, in turn, will reinvigorate participants' teaching; prepare them to update aging-related content in the…

  11. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  12. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence. PMID:24704735

  13. Integrating end-of-life care with disease management programs: a new role for case managers.

    PubMed

    Lazarus, A

    2001-03-01

    Case managers are crucial to any well-designed disease management program. However, in the progressive course of serious illness, patients, their families, and MCOs need the skills of case manager more than ever to help them through end-of-life care choices. The author describes what case managers will need in their "toolbox" to provide insight to these health plan members.

  14. Proceedings of the Inaugural Meeting of the International Forum for Reactor Aging Management (IFRAM)

    SciTech Connect

    Bond, Leonard J.; Brenchley, David L.

    2011-09-01

    In almost all countries with nuclear power plants (NPPs), regulatory authorities and the nuclear industry are looking at some form of extended operating periods. To support life extension activities it is necessary to ensure the continued safety and reliability of system, structures, and components, and the component materials. Internationally, a variety of individual national and international activities have been initiated including Plant Life Management through the International Atomic Energy Agency, Electric Power Research Institute’s Long Term Operation program, and various national programs in managing materials degradation and related topics. The U.S. Nuclear Regulatory Commission (NRC) engaged the international community in workshops in 2005-2006 to identify research needs and to collect information in an expert panel report on Proactive Management of Materials Degradation (PMMD), which was reported in NUREG/CR-6923. These results are also available via an Information Tool on the internet at http://pmmd.pnl.gov. This information builds on the extensive compilations known as the GALL Report (Generic Aging Lessons Learned, NUREG-1801, Vols. 1 and 2). Pacific Northwest National Laboratory (PNNL) recently issued a report on the review of various international activities in PMMD (PNNL-17779). There have also been initiatives by Electricite de France, Tokyo Electric Power Company, EPRI, and others to establish a "Materials Aging Institute." Within the materials degradation research community there are also networks and technical meetings focused on some elements of PMMD. In spite of all these efforts, there is currently no forum to bring together these diverse activities and provide coordinated information exchange and prioritization of materials aging management/PMMD topics. It is believed that the International Forum for Reactor Aging Management (IFRAM) would be a good way to achieve this goal and help develop new approaches for ensuring continued safe

  15. Mindfulness-Based Program for Management of Aggression Among Youth: A Follow-up Study

    PubMed Central

    Sharma, Manoj Kumar; Sharma, Mahendra P.; Marimuthu, P.

    2016-01-01

    Background: Youth have shown indulgence in various high-risk behaviors and violent activities. Yoga-based approaches have been used for the management of psychological problems. The present work explores the role of mindfulness-based program in the management of aggression among youth. Materials and Methods: Sociodemographic information schedule, Buss-Perry Aggression Questionnaire, and World Health Organization quality of life were administered on 50 subjects in the age range of 18-25 years at pre- and post-mindfulness-based program level. Results: It revealed the presence of feeling of well-being and ability to relax themselves; changes in score of anger, hostility, physical, and verbal aggression; and enhancement of quality of life in the physical and environment domains at 1 month follow-up. Conclusions: Mindfulness-based program has shown changes in aggression expression/control and implies integration of it in available program for the management of aggression among youth. PMID:27335516

  16. Oak Ridge National Laboratory Isotopes Facilities Shutdown Program Management Plan

    SciTech Connect

    Hill, L.G.; Eversole, R.E.; Kibbe, R.K.

    1992-05-01

    The goal of the Isotopes Facilities Shutdown Program (IFSP) is to place the isotopes facilities at ORNL in a radiologically and industrially safe condition for routine maintenance and surveillance prior to eventual decommissioning. Implementation and completion of the shutdown program will significantly reduce the risks to the environment and public safety and health. Furthermore, it should result in reduced surveillance and maintenance costs for future years. The IFSP Management Plan has been prepared to document the objectives, define or organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the program.

  17. Waste Management Program. Technical progress report, October-December 1982

    SciTech Connect

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  18. Everglades Collaborative Adaptive Management Program Progress

    EPA Science Inventory

    When the Comprehensive Everglades Restoration Plan (CERP) was authorized in 2000, adaptive management (AM) was recognized as a necessary tool to address uncertainty in achieving the broad goals and objectives for restoring a highly managed system. The Everglades covers18,000 squ...

  19. Glycemic outcome not predicted by baseline psychological measures in a diabetes management program.

    PubMed

    Graco, Marnie; Hutchinson, Anastasia; Barker, Anna; Lawlor, Vicki; Wong, Rita; Fourlanos, Spiros

    2012-06-01

    The Northern Health Diabetes Hospital Admission Risk Program is a chronic disease management program that aims to improve the glycemic management of patients with diabetes. The aim of this project was to determine if there was any relationship between psychological characteristics and glycemic outcome in a diabetes management program. A prospective study of patients attending the diabetes management program investigated validated measures of cognition, stage of change, locus of control, self-efficacy, depression and anxiety, and quality of life. The study investigated 86 type 2 diabetes patients (mean age 59 years, 49% female). Glycemic control (HbA1c) was measured at baseline and after 12 months in the program. Glycemic control was poor on admission to the service with a mean HbA1c of 8.9%. The measures of cognition, self-efficacy, locus of control, mental health, and quality of life were not associated with improvements in HbA1c. Those participants with shorter duration of disease and more contacts with the service were significantly more likely to experience improvements in HbA1c. Psychometric data were not predictive of glycemic outcome. Rather, in this chronic disease management program, glycemia improved more in patients who were seen earlier in their disease course and managed more intensively, regardless of their psychometric status.

  20. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  1. Calculator program aids well cost management

    SciTech Connect

    Doyle, C.J.

    1982-01-18

    A TI-59 calculator program designed to track well costs on daily and weekly bases can dramatically facilitate the task of monitoring well expenses. The program computes the day total, cumulative total, cumulative item-row totals, and day-week total. For carrying these costs throughout the drilling project, magnetic cards can store the individual and total cumulative well expenses.

  2. Managing Large-Scale Online Graduate Programs

    ERIC Educational Resources Information Center

    Singleton, Jacques; Bowser, Audrey; Hux, Annette; Neal, Gwendolyn

    2013-01-01

    As with most states, Arkansas is experiencing substantial growth in the delivery of academic programs and courses by distance learning provided by institutions of higher education. At Arkansas State University faculty have adhered to the need of students and developed a completely online certification and master's program in Educational…

  3. The Many Dimensions of Program Management

    NASA Technical Reports Server (NTRS)

    Dean, Edwin B.

    1992-01-01

    For the purposes of this paper, program refers to a collection of activities or projects which must be performed according to a plan or schedule. The Space Exploration Initiative within the National Aeronautics and Space Administration (NASA) is an example. Dimensionality refers to both the various perspectives of a program and to the components within that perspective. It is, thus, appropriate to think of dimensions of dimensionality. For example, one dimension or perspective of a program is the projects which perform the program. Within the project dimension, the individual projects are the components of that dimensionality. The number of projects defines the spatial dimensionality of the project dimension. Thus, each perspective or dimension has a dimensionality of its own. The structure and associated values of all the various perspectives of a program define the program. A project refers to the collection of activities required to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a given system. A project thus effects the life cycle of given system. A project is, thus, the system to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a system. A program, thus, effects the life cycle of the collection of projects required to effect the collection of systems required to implement the program.

  4. Evaluation of the Arkansas Medicaid Primary Care Physician Management Program

    PubMed Central

    Muller, Andreas; Baker, John A.

    1996-01-01

    Arkansas implemented a primary-care case-management program in February 1994. This study evaluates the program during its first 17 months. Using quarterly data collected for the Health Care Financing Administration (HCFA), a pooled cross-sectional time series analysis (1991:4-1995:2) estimates the effect of eligibles' program enrollment on expenditure (total, inpatient hospital, outpatient hospital, physicians, prescription drugs, laboratory and X-ray) and utilization measures (outpatient visits, physician visits, prescription drugs). The Arkansas Medicaid managed care program appears to have somewhat reduced growth in total vendor payments and also appears to have improved access to primary medical services. PMID:10165704

  5. Life management of aging Air Force aircraft: NDE perspective

    NASA Astrophysics Data System (ADS)

    Cordell, Tobey M.

    1995-07-01

    Continuing trends toward reduced procurement of new aircraft is forcing the United States Air Force (USAF) to extend the operational life of its current aircraft. In the past, the USAF operator was able to replace fleet aircraft on a fairly regular basis. This process has been drastically altered by the significant reductions in the Defense Department budget as a result of the end of the Cold War. The requirement to extend the fleet's operational life is placing greater importance on the ability to find, characterize, and ameliorate the deleterious effects of operation and maintenance. In addition, many aircraft are being asked to operate with changed mission requirements that were not envisioned when they were originally procured. The life management of the aging fleet is interwoven with the ability to utilize nondestructive evaluation (NDE) to identify and characterize changes in the materials and structures throughout their lifetime.

  6. Effective program management: a cornerstone of malaria elimination.

    PubMed

    Gosling, Jonathan; Case, Peter; Tulloch, Jim; Chandramohan, Daniel; Wegbreit, Jennifer; Newby, Gretchen; Gueye, Cara Smith; Koita, Kadiatou; Gosling, Roly

    2015-07-01

    Effective program management is essential for successful elimination of malaria. In this perspective article, evidence surrounding malaria program management is reviewed by management science and malaria experts through a literature search of published and unpublished gray documents and key informant interviews. Program management in a malaria elimination setting differs from that in a malaria control setting in a number of ways, although knowledge and understanding of these distinctions are lacking. Several core features of successful health program management are critical to achieve elimination, including effective leadership and supervision at all levels, sustained political and financial commitment, reliable supply and control of physical resources, effective management of data and information, appropriate incentives, and consistent accountability. Adding to the complexity, the requirements of an elimination program may conflict with those of a control regimen. Thus, an additional challenge is successfully managing program transitions along the continuum from control to elimination to prevention of reintroduction. This article identifies potential solutions to these challenges by exploring managerial approaches that are flexible, relevant, and sustainable in various cultural and health system contexts.

  7. The Puerto Rican parrot reintroduction program: sustainable management of the aviary population.

    PubMed

    Earnhardt, Joanne; Vélez-Valentín, Jafet; Valentin, Ricardo; Long, Sarah; Lynch, Colleen; Schowe, Kate

    2014-01-01

    The cornerstone of the recovery plan for the critically endangered Puerto Rican parrot (Amazona vitatta) is an actively managed, long-term reintroduction program. One captive population distributed across two aviaries in Puerto Rico is the sole source for release but its ability to persist as a managed resource has not been evaluated since 1989. We conducted an assessment for sustainable management of the aviary population while harvesting for release. To assess demographic rates such as population growth, vital rates, and age/sex structure, we compiled a studbook database on all living, dead, and released individuals in the aviary population. Using an individual-based risk assessment model we applied population specific data based on the management period from 1993 to 2012 to simulate future aviary population dynamics and evaluate future potential production. We modeled four potential management strategies to harvest parrots for proposed releases; these scenarios vary the number of parrots and the life stage. Our simulations revealed that the aviary population can be simultaneously managed for sustainability and harvesting of parrots for release. However, without cautious management, overharvesting can jeopardize sustainability of the aviary population. Our analysis of the aviary breeding program provides a rare opportunity to review progress relative to conservation program objectives after four decades of active management. The successful growth of the aviary population and its ability to serve as a sustainable source for reintroductions supports the 1973 decision to build a breeding program from a small population of 13 parrots.

  8. Developing Occupation-Based Preventive Programs for Late-Middle-Aged Latino Patients in Safety-Net Health Systems

    PubMed Central

    Carlson, Mike; Martínez, Jenny; Guzmán, Laura; Mahajan, Anish; Clark, Florence

    2015-01-01

    Latino adults between ages 50 and 60 yr are at high risk for developing chronic conditions that can lead to early disability. We conducted a qualitative pilot study with 11 Latinos in this demographic group to develop a foundational schema for the design of health promotion programs that could be implemented by occupational therapy practitioners in primary care settings for this population. One-on-one interviews addressing routines and activities, health management, and health care utilization were conducted, audiotaped, and transcribed. Results of a content analysis of the qualitative data revealed the following six domains of most concern: Weight Management; Disease Management; Mental Health and Well-Being; Personal Finances; Family, Friends, and Community; and Stress Management. A typology of perceived health-actualizing strategies was derived for each domain. This schema can be used by occupational therapy practitioners to inform the development of health-promotion lifestyle interventions designed specifically for late-middle-aged Latinos. PMID:26565102

  9. Developing Occupation-Based Preventive Programs for Late-Middle-Aged Latino Patients in Safety-Net Health Systems.

    PubMed

    Schepens Niemiec, Stacey L; Carlson, Mike; Martínez, Jenny; Guzmán, Laura; Mahajan, Anish; Clark, Florence

    2015-01-01

    Latino adults between ages 50 and 60 yr are at high risk for developing chronic conditions that can lead to early disability. We conducted a qualitative pilot study with 11 Latinos in this demographic group to develop a foundational schema for the design of health promotion programs that could be implemented by occupational therapy practitioners in primary care settings for this population. One-on-one interviews addressing routines and activities, health management, and health care utilization were conducted, audiotaped, and transcribed. Results of a content analysis of the qualitative data revealed the following six domains of most concern: Weight Management; Disease Management; Mental Health and Well-Being; Personal Finances; Family, Friends, and Community; and Stress Management. A typology of perceived health-actualizing strategies was derived for each domain. This schema can be used by occupational therapy practitioners to inform the development of health-promotion lifestyle interventions designed specifically for late-middle-aged Latinos.

  10. Hanford Site Groundwater Protection Management Program: Revision 1

    SciTech Connect

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.

  11. Building a strategic technology management program.

    PubMed

    Stewart, T R

    1993-06-01

    Strategic technology management decisions are one of the best opportunities for healthcare providers to positively meet clinical needs, patient expectations and competitiveness goals. Technology management must not be treated as an event (annual capital budgeting) but as a well-thought-out, long-range business plan. A strategic technology management team should be formed that includes all the key strategic business areas, plus ad hoc members from the clinical and biomedical engineering areas. Current and future needs should be assessed and the performance of the plan monitored. A plan will help achieve buy-in from clinicians and reduce unwarranted expenditures on technology. PMID:10126473

  12. The Sioux Lookout Diabetes Program: diabetes prevention and management in northwestern Ontario.

    PubMed

    Morrison, N; Dooley, J

    1998-01-01

    Clinically, non-insulin-dependent diabetes mellitus (NIDDM) in the First Nations population of the Sioux Lookout Zone (SLZ), Northwestern Ontario, represents a very different entity than that found in the general Canadian population. Here, its prevalence reaches upwards of 17% (over the age of 10) and children as young as five years of age have been diagnosed. Diabetic ketoacidosis is frequently found, and clients with blood glucose levels of 50 mmol/L or more have remained asymptomatic. Prevention and management of NIDDM in the SLZ must reflect this reality, as well as those of geographic remoteness; community-specific needs; and cultural, in addition to personal, relevance. Over the past five years, the Sioux Lookout Diabetes Program has been developing innovative services and resources to address these needs. Traveling foot-care and diabetes education programs, Community Health Representative training programs, a youth camp, school programs, grocery store labeling programs, and culturally relevant education manuals are a few such initiatives. Visions for the future include the development of a network of community-based diabetes workers to address more completely prevention and management needs on an ongoing basis and the development of stress management workshops for First Nations clients. With our current programming, these new initiatives, and an aggressive early screening program, we hope to stem the imminent onslaught of amputations, heart attacks, renal failure, and blindness.

  13. Age 26 Cost-Benefit Analysis of the Child-Parent Center Early Education Program

    ERIC Educational Resources Information Center

    Reynolds, Arthur J.; Temple, Judy A.; White, Barry A. B.; Ou, Suh-Ruu; Robertson, Dylan L.

    2011-01-01

    Using data collected up to age 26 in the Chicago Longitudinal Study, this cost-benefit analysis of the Child-Parent Centers (CPC) is the first for a sustained publicly funded early intervention. The program provides services for low-income families beginning at age 3 in 20 school sites. Kindergarten and school-age services are provided up to age 9…

  14. Management of the aging risk factor for Parkinson's disease.

    PubMed

    Phillipson, Oliver T

    2014-04-01

    The aging risk factor for Parkinson's disease is described in terms of specific disease markers including mitochondrial and gene dysfunctions relevant to energy metabolism. This review details evidence for the ability of nutritional agents to manage these aging risk factors. The combination of alpha lipoic acid, acetyl-l-carnitine, coenzyme Q10, and melatonin supports energy metabolism via carbohydrate and fatty acid utilization, assists electron transport and adenosine triphosphate synthesis, counters oxidative and nitrosative stress, and raises defenses against protein misfolding, inflammatory stimuli, iron, and other endogenous or xenobiotic toxins. These effects are supported by gene expression via the antioxidant response element (ARE; Keap/Nrf2 pathway), and by peroxisome proliferator-activated receptor gamma co-activator 1 alpha (PGC-1 alpha), a transcription coactivator, which regulates gene expression for energy metabolism and mitochondrial biogenesis, and maintains the structural integrity of mitochondria. The effectiveness and synergies of the combination against disease risks are discussed in relation to gene action, dopamine cell loss, and the accumulation and spread of pathology via misfolded alpha-synuclein. In addition there are potential synergies to support a neurorestorative role via glial derived neurotrophic factor expression.

  15. Aging management of fossil-fired plants of Electricite de France: PVP maintenance aspects

    SciTech Connect

    Thoraval, G.

    1995-12-01

    The generation mix of EDF comprises 17,000 MW of fossil-fired units, the ages of which go from 10 to 32 years. Extensive studies have been launched in 1994, inside the Company, to determine: (1) prospects of needs of the grid (domestic/exports); (2) prospects of possible competition in generation field; (3) environmental aspects and possible evolution; (4) adaptation of management of men and organizations; and (5) management of condition of equipment through maintenance policy. This paper focuses on the last item, spotted on pressure vessels and piping. The question is: How to conserve the ``patrimony`` for very long term, with lowest costs to keep it competitive in its very specific role? Several items are examined: (1) the background, the different programs of retrofitting, refurbishment and life extension; (2) conservation during outages, and mothballing procedures and experience; (3) design review, actual design life expectancy; (4) analysis of aging mechanisms through experience feedback; (5) determination of critical components, analysis of their condition, periodical updating; (6) maintenance adaptation, extensive condition-monitored maintenance approach: use of existing probes and data, development of new devices and skills; (7) policy of progressive replacement of worn-out and potentially dangerous components; examples concerning generic problems; (8) management of requirements of pressure vessels regulations; (9) adaptation of spare parts policy; and (10) research and development needed by life management.

  16. EPA'S WATERSHED MANAGEMENT AND MODELING RESEARCH PROGRAM

    EPA Science Inventory

    Watershed management presumes that community groups can best solve many water quality and ecosystem problems at the watershed level rather than at the individual site, receiving waterbody, or discharger level. After assessing and ranking watershed problems, and setting environ...

  17. Aging management of nuclear power plant containments for license renewal

    SciTech Connect

    Liu, W.C.; Kuo, P.T.; Lee, S.S.

    1997-09-01

    In 1990, the Nuclear Management and Resources Council (NUMARC), now the Nuclear Energy Institute (NEI), submitted for NRC review, the industry reports (IRs), NUMARC Report 90-01 and NUMARC Report 90-10, addressing aging management issues associated with PWR containments and BWR containments for license renewal, respectively. In 1996, the Commission amended 10 CFR 50.55a to promulgate requirements for inservice inspection of containment structures. This rule amendment incorporates by reference the 1992 Edition with the 1992 Addenda of Subsections IWE and IWL of the ASME Code addressing the inservice inspection of metal containments/liners and concrete containments, respectively. The purpose of this report is to reconcile the technical information and agreements resulting from the NUMARC IR reviews which are generally described in NUREG-1557 and the inservice inspection requirements of subsections IWE and IWL as promulgated in {section}50.55a for license renewal consideration. This report concludes that Subsections IWE and IWL as endorsed in {section}50.55a are generally consistent with the technical agreements reached during the IR reviews. Specific exceptions are identified and additional evaluations and augmented inspections for renewal are recommended.

  18. Agents Contribute to Statewide Program Designs in Yardwaste Management.

    ERIC Educational Resources Information Center

    May, James H.; And Others

    1994-01-01

    A survey of 125 Virginia extension agents received 90 responses demonstrating their knowledge of yard waste management and composting. Results were used to develop public education programs and pilot projects about composting. (SK)

  19. The Agway Management Development Program: Design and Implementation

    ERIC Educational Resources Information Center

    Barth, Anthony L.; Engfer, Robert T.

    1977-01-01

    Focus is on the Agway (a farm supply and food marketing cooperative) retail store system in this informational case history and how-to approach for designing, developing, and implementing a formal corporate management program. (Editor/TA)

  20. NASA Space Flight Program and Project Management Handbook

    NASA Technical Reports Server (NTRS)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  1. Results from the Nuclear Plant Aging Research Program: Their use in inspection activities

    SciTech Connect

    Gunther, W.; Taylor, J. )

    1990-09-01

    The US NCR's Nuclear Plant Aging Research (NPAR) Program has determined the susceptibility to aging of components and systems, and the potential for aging to impact plant safety and availability. The NPAR Program also identified methods for detecting and mitigating aging in components. This report describes the NPAR results which can enhance NRC inspection activities. Recommendations are provided for communicating pertinent information to NRC inspectors. These recommendations are based on a detailed assessment of the NRC's Inspection Program, and feedback from resident and regional inspectors as described within. Examples of NPAR report summaries and aging inspection guides for components and systems are included. 13 refs., 3 figs., 4 tabs.

  2. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... training and development programs to promote high performance in its regulatory project management staff... its training program to give regulatory project managers the opportunity to tour...

  3. UMTRA Project Administrative Files Collection Records Management Program

    SciTech Connect

    Not Available

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

  4. Taipower`s radioactive waste management program

    SciTech Connect

    Lee, B.C.C.

    1996-09-01

    Nuclear safety and radioactive waste management are the two major concerns of nuclear power in Taiwan. Recognizing that it is an issue imbued with political and social-economic concerns, Taipower has established an integrated nuclear backend management system and its associated financial and mechanism. For LLW, the Orchid Island storage facility will play an important role in bridging the gap between on-site storage and final disposal of LLW. Also, on-site interim storage of spent fuel for 40 years or longer will provide Taipower with ample time and flexibility to adopt the suitable alternative of direct disposal or reprocessing. In other words, by so exercising interim storage option, Taipower will be in a comfortable position to safely and permanently dispose of radwaste without unduly forgoing the opportunities of adopting better technologies or alternatives. Furthermore, Taipower will spare no efforts to communicate with the general public and make her nuclear backend management activities accountable to them.

  5. The Westinghouse Waste Isolation Division Management and Supervisor Training Program

    SciTech Connect

    Gilbreath, B.

    1992-04-23

    The Westinghouse Waste Isolation Division (WID) is the management and operating contractor (MOC) for the Department of Energy`s (DOE`s) Waste Isolation Plant (WIPP). Managers and supervisors at DOE facilities such as the WIPP are required to complete extensive training. To meet this requirement, WID created a self-paced, self-study program known as Management and Supervisor Training (MAST). All WID managers and supervisors are required to earn certification through the MAST program. Selected employees are permitted to participate in MAST with prior approval from their manager and the Human Resources Manager. Initial MAST certification requires the completion of 31 modules. MAST participants check out modules and read them when convenient. When they are prepared, participants take module examinations. To receive credit for a given module, participants must score at least 80 percent on the examination. Lessons learned from the development, implementation, and administration are presented in this paper.

  6. Principal's Preparation Program: Managing the Learning Environment Using ELCC Standards

    ERIC Educational Resources Information Center

    Tubbs, J. Eric; Heard, Michael S.; Epps, Adrian

    2011-01-01

    School principals need to be well prepared to manage school facilities assigned to their care. Educational leadership programs can make best use of the Educational Leadership Constituent Council (ELCC) Standards to develop a course of study to address school facility management issues. Every standard has its facility implications that lead to…

  7. Results of the Survey on Program Management in Education Abroad

    ERIC Educational Resources Information Center

    Forum on Education Abroad, 2007

    2007-01-01

    In an effort to gather information on the latest management practices in the field, the Forum on Education Abroad's Data Committee, under the leadership of its chair, Kim Kreutzer, designed a survey to assess study abroad program management practices. The Data Committee was assisted in this effort by the Forum's Standards Committee and the Forum…

  8. Appendix E - GPRA06 federal energy management program documentation

    SciTech Connect

    None, None

    2009-01-18

    The mission of the Federal Energy Management Program (FEMP) is to promote energy security, environmental stewardship and cost reduction through energy efficiency and water conservation, the use of distributed and renewable energy, and sound utility management decisions at Federal sites. [FY 2005 Congressional Budget Request, p. 475

  9. Make safety programs work efficiently with an effective management plan

    SciTech Connect

    Lyle, D.

    1995-07-01

    Like budgets or any other major projects, safety works better when everyone in the company commits to manage the program effectively. Let someone overspend a budget or miss a projected revenue plan and a company moves quickly to correct the problem. However, there is a tendency to ignore a manager whose department has a poor safety record, as though it`s bad luck.

  10. Managing Adult and Continuing Education Programs and Staff.

    ERIC Educational Resources Information Center

    Langerman, Philip D., Ed.; Smith, Douglas H., Ed.

    Developed to assist managers of adult and continuing education programs, this management guide contains thirteen chapters written by several authors selected for their expertise in their respective areas. These chapters are divided into three major sections. The first section includes three introductory chapters providing (1) an overview of this…

  11. OVERVIEW OF THE INTRAMURAL RISK MANAGEMENT RESEARCH PROGRAM

    EPA Science Inventory

    This presentation will provide a summary of the risk management portion of ORD's endocrine disrupting chemicals (EDCs) research program, including its motivation, goals, planning efforts and resulting research areas.

    In an emerging research area like EDCs, risk management ...

  12. Psychotropic Medication Management in a Residential Group Care Program

    ERIC Educational Resources Information Center

    Spellman, Douglas F.; Griffith, Annette K.; Huefner, Jonathan C.; Wise, Neil, III; McElderry, Ellen; Leslie, Laurel K.

    2010-01-01

    This article presents a psychotropic medication management approach that is used within a residential care program. The approach is used to assess medications at youths' times of entry and to facilitate decision making during care. Data from a typical case study have indicated that by making medication management decisions slowly, systematically,…

  13. Examining the Efficacy of Management for Pennsylvania School Health Programs

    ERIC Educational Resources Information Center

    Jacobi, Wendy J.

    2010-01-01

    In Pennsylvania, certified school nurses were governed by the same educational rules and administrative directives as teachers. School nurses were supervised and evaluated by non-nurse managers who had no knowledge of the scope of school nurse practice. A focus of the study was to examine the efficacy of management for school health programs. The…

  14. 76 FR 80342 - Coastal Zone Management Program: Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... October 14, 2011 (76 FR 57022). The comment period expired on October 31, 2011. The FEIS includes... National Oceanic and Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and Atmospheric Administration...

  15. 77 FR 8219 - Coastal Zone Management Program: Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... ICMP was published December 23, 2011 for a 30-day comment period (76 FR 80342). The comment period... National Oceanic and Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and Atmospheric Administration (NOAA),...

  16. Better Choices: Evaluating the Effectiveness of Behavior Management Programs

    ERIC Educational Resources Information Center

    Acuna, Miguel T.

    2011-01-01

    Managing student behavior is often looked upon as a sidebar in teaching. The lack of formal classroom management training in teacher education programs reveals the low importance placed on this skill. As a result, teachers are often very well prepared to instruct, but in terms of effectively understanding the behavior of students--particularly…

  17. Sustainable Supply Chain Management Programs in the 21st Century

    ERIC Educational Resources Information Center

    Neureuther, Brian D.; O'Neill, Kevin

    2011-01-01

    One of the most difficult challenges for an undergraduate supply chain management program at smaller universities is to create an environment of sustainability. Supply chain management is not at the tip of tongue for many graduating high school students and few undergraduate curriculums require a course in the content area. This research addresses…

  18. Aging of beryllium bronze under programmed loading conditions

    SciTech Connect

    Duraev, P.P.; Kaplun, Yu.A.

    1987-07-01

    Results are provided from a study of different aging methods for beryllium bronze BrBNT1.9Mg under tensile stress conditions created by an applied load. Aging, both in the original hardened condition and after low-temperature treatment, is found to lead to an increase in yield strength and elastic limit. Ultimate breaking strength, hardness, and ductility do not change. An increase in deformation resistance after aging is connected with oriented precipitation of gamma-phase particles.

  19. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  20. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  1. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  2. Graphic visualization of program performance aids management review

    NASA Technical Reports Server (NTRS)

    Eisenhart, G. N.

    1967-01-01

    Chart technique /PERTREE/ which displays the essential status elements of a PERT system in a vertical flow array, of high graphic quality, enables visual review by management of program performance. Since the display is versatile, it can accommodate any aspect of the program which the presenter wishes to accent.

  3. Programs for the Gifted - Site Management. Revised 1977.

    ERIC Educational Resources Information Center

    Heppell, Helen M.

    The manual is designed to help educational personnel handle day-to-day responsibilities and managment of programs for the gifted in the San Diego City schools. The first section explores program maintenance and describes services, identifies departmental sources, and offers suggestions for optimum use of services. The second and third sections…

  4. An Analysis of Small Business Administration Management Training Program.

    ERIC Educational Resources Information Center

    Galbraith, Oliver, III

    This study examined the impact of the Small Business Administration (SBA) Management Training Program at San Diego State College on its participants, and investigated certain characteristics of small businessmen that might relate to acceptance or rejection of concepts presented in the program. The sample consisted of 57 past participants (38 owner…

  5. Guidelines for a Business Management Training Program for Native Americans.

    ERIC Educational Resources Information Center

    Patton, C. Duane; Hollow, Anton

    The culmination of a 1975-76 Washington project aimed at providing American Indians with a model business management training program (post secondary level), this report includes: (1) an overview of the project's purpose/approach (development of a training program to provide interface between the socioeconomic phenomena of the Indian Community and…

  6. Strategic Human Resources Management of Employer Cooperative Education Programs.

    ERIC Educational Resources Information Center

    Nielsen, Richard P.; Porter, Ralph C.

    1982-01-01

    This article discusses effective strategic planning and management of employer cooperative education programs. It examines types of planning, the need for such programs, and implementation strategies. Several case studies are considered: Dayton-Hudson, IBM, AT&T, Delta Airlines, and Rockwell International. (CT)

  7. A Perspective on a Management Information Systems (MIS) Program Review

    ERIC Educational Resources Information Center

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  8. Managing Age Discrimination: An Examination of the Techniques Used when Seeking Employment

    ERIC Educational Resources Information Center

    Berger, Ellie D.

    2009-01-01

    Purpose: This article examines the age-related management techniques used by older workers in their search for employment. Design and Methods: Data are drawn from interviews with individuals aged 45-65 years (N = 30). Results: Findings indicate that participants develop "counteractions" and "concealments" to manage perceived age discrimination.…

  9. 2008 Federal Energy Management Program (FEMP) Market Report

    SciTech Connect

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  10. Land Use Management for Solid Waste Programs

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  11. Programmed management of acute cervical cord trauma.

    PubMed

    White, R J; Bryk, J P; Yashon, D; Albin, M S; Demian, Y K

    Results in ten patients admitted with the diagnosis of complete traumatic quadriplegia and with fracture-dislocation of the cervical spine are reviewed. Emphasis is placed on aggressive emergency surgical treatment of these lesions such as tracheostomy, laminectomy and cord cooling, incorporated into a detailed protocol of overall management.

  12. Thrips management program for plants for planting

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Thrips Management includes sanitation, exclusion, chemical control and biological control. Sanitation. Remove weeds, old plant debris, and growing medium from within and around the greenhouse. Eliminate old stock plants as these are a source of thrips and viruses. Removing old flowers may reduce the...

  13. Financial Management Guide: Child Care Food Program.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort.

    Intended for day care providers in Kentucky, this publication contains sample forms and guidelines for filling out the forms required by the Division of School Food Services of the Kentucky Department of Education. Topics covered include allowable expenditures during the month, program income, records, auditing, reimbursement for sponsors of child…

  14. QUANTITATIVE DECISION TOOLS AND MANAGEMENT DEVELOPMENT PROGRAMS.

    ERIC Educational Resources Information Center

    BYARS, LLOYD L.; NUNN, GEOFFREY E.

    THIS ARTICLE OUTLINED THE CURRENT STATUS OF QUANTITATIVE METHODS AND OPERATIONS RESEARCH (OR), SKETCHED THE STRENGTHS OF TRAINING EFFORTS AND ISOLATED WEAKNESSES, AND FORMULATED WORKABLE CRITERIA FOR EVALUATING SUCCESS OF OPERATIONS RESEARCH TRAINING PROGRAMS. A SURVEY OF 105 COMPANIES REVEALED THAT PERT, INVENTORY CONTROL THEORY AND LINEAR…

  15. Management. Program CIP: Business Management: 52.0204

    ERIC Educational Resources Information Center

    Murdock, Ashleigh Barbee, Ed.

    2008-01-01

    Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  16. Benchmarking processes for managing large international space programs

    NASA Technical Reports Server (NTRS)

    Mandell, Humboldt C., Jr.; Duke, Michael B.

    1993-01-01

    The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

  17. Assessment and Management of Aging in Phenix Nuclear Power Plant

    SciTech Connect

    Dumarcher, V.; Bourrier, J.L.; Chaucheprat, P.; Boulegue, D.

    2006-07-01

    The combination of one or several processes of ruins can involve the materials failure of a nuclear power plant. These processes arise from the external agents action such as the pressure, the mechanical efforts, the heat flows and the radiations constitute the whole of the 'actions' of the surrounding medium. The prolongation and the repetition of these effects can involve a deterioration of the machine. In accordance with the decree of February 26, 1974, the PWR operator must be firstly, sure that the system is controlled according to the situations considered in the file of dimensioning and secondly, be able to know anytime the life of the equipment. The physical phenomena which cause the structures ruin are less complex in the PWR than in the SFR. In the SFR, the high temperatures imposed on components for long periods can involve a significant creep. In the course of time, this deformations accelerate the release of fatigue cracks. To consider the creep, the reactor lifespan is correlated at the numbers of thermals transients envisaged initially. To realize the management of aging in Phenix power plant, it is necessary to carry out an individualized monitoring of the structures and not only on the vessel. We must ensure the good state and/or the correct operation of the significant stations for safety which are the control of the reactivity, the movement of control rods, the primary sodium containment and the decay heat removal. For that, we monitor the main vessel, the conical skirt, the IHX and the Core Cover Plug. A profound knowledge of the thermal transients of the past is necessary to carry out an effective assessment. In order to guarantee that any harmful situation is well taken into the management of aging, we monitor permanently certain measurements (primary and secondary pump speed, hot and cold pool temperatures, IHX-main vessel and reactor roof temperatures). We present in the article the scientific method used in the Physics Section. A logical

  18. Principles of disaster management. Lesson 2: Program planning.

    PubMed

    Cuny, F C

    1998-01-01

    Many of the problems that develop in disaster management can be avoided with good program planning. Assessment following a disaster is essential. Needs assessment is essential in the early phases of a disaster and situation assessments become more important as the disaster process continues. Both are dynamic and continuous processes. Program planning requires setting policies, goals, and objectives with the end result of selection of strategies to accomplish the mission. Implementation of the strategies requires identification of funding sources, allocation of the resources, development management, and monitoring of the progress. Together, these elements should result in a balanced and successful program.

  19. Waste Management Program. Technical progress report, July-December, 1984

    SciTech Connect

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement.

  20. Waste Management Program. Technical progress report, Aporil-June 1983

    SciTech Connect

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  1. First German Disease Management Program for Breast Cancer

    PubMed Central

    Rupprecht, Christoph

    2005-01-01

    The first disease management program contract for breast cancer in Germany was signed in 2002 between the Association of Regional of Physicians in North-Rhine and the statutory health insurance companies in Rhineland. At the heart of this unique breast cancer disease management program is a patient-centered network of health care professionals. The program's main objectives are: (1) to improve the quality of treatment and post-operative care for breast cancer patients, (2) to provide timely information and consultation empowering the patient to participate in decisionmaking, (3) to improve the interface between inpatient and outpatient care, and (4) to increase the number of breast-conserving surgeries. PMID:17288079

  2. Volunteers in hospital-based case management programs.

    PubMed

    Netting, F E; Williams, F G; Jones-McClintic, S; Warrick, L

    1989-01-01

    This article examines the use of volunteers within hospital-based long-term care case management programs. As hospitals diversify into long-term care, the roles played by volunteers are also diversifying. A brief description of the involvement of volunteers with the frail elderly is followed by a comparison of the roles and relationships of volunteers within existing hospital auxiliaries and long-term care case management programs. Three models for structuring hospital-based volunteer programs that address the needs of the frail elderly within diverse communities are presented. Implications surrounding the involvement of volunteers beyond hospital walls are discussed.

  3. [Impact of a fatigue management program in patients on hemodialysis].

    PubMed

    Merlin, Marjolaine Dionne; Gallant, Gemma

    2010-01-01

    The purpose of this study was to evaluate the impact of a fatigue management program on 25 hemodialysis patients regarding their level of fatigue and their rate of satisfaction towards knowledge. The study took place inside a hemodialysis unit in a health care facility located in New Brunswick. This research design was pre-experimental. The before-after design, with only one group of subjects, makes it possible to compare the level of fatigue, as well as the rate of satisfaction towards pre- and post-program knowledge. According to the results of our study, it seems that the subjects, after benefiting from a fatigue management program, managed to significantly decrease their level of fatigue and gain satisfaction related to the acquisition of knowledge. Even though our number of participants was small, our research supports the idea that a fatigue management program can meet the need of fatigue management in this population. The results of this study foresee the need to develop a fatigue management program in hemodialysis units and to evaluate its effectiveness in the medium or long term in selecting quasi-experimental studies, including a broader population of patients.

  4. Aging research program at the LaCrosse Nuclear Power Plant

    SciTech Connect

    Goller, K.R.; Sideris, T.

    1988-01-01

    An aging research program (ARP) is being conducted at the LaCrosse boiling water reactor (LACBWR) nuclear power plant. In the spring of 1987, Dairyland Power Cooperative, the owner/licensee of the LACBWR plant, announced that it was permanently shutting down this plant and intended to decommission it. Shortly thereafter, Dairyland entered into an agreement with DiBenedetto Associates to be the exclusive agent and manager of the ARP. Wyle Laboratories is the primary supporting contractor to DBA in this effort. The primary objective of the ARP is to identify and characterize the time-dependent environmental and operationally induced degradation of components, systems, and structures and the way that it could limit useful life or could result in loss of function or impairment of safety. Results from this program will improve the predictability of aging effects on nuclear and fossil fuel power plants. The ARP has been designed and is being conducted to be compatible and integrated with Dairyland's plans to decommission the LACBWR plant.

  5. Use of Management Training Simulations in a University Educational Administration Program. The Program of Exercises for Management and Organizational Development.

    ERIC Educational Resources Information Center

    Deep, Samuel D.

    This report describes self-administered exercises on management and organizational development that emphasize a participative approach in small groups. The Program of Exercises (PEX), an integrated set of exercises, incorporates case study, role playing, programed instruction, and sensitivity training. The training provides a series of experiences…

  6. Evaluation of Mental Health Programs for the Aged.

    ERIC Educational Resources Information Center

    Kahn, Robert L.; Zarit, Steven H.

    This paper highlights what the authors believe are the important issues and directions of change in the evaluation of mental health programs. The rationale for such evaluation is twofold. First, it provides a scientifically rigorous method of determining the therapeutic efficacy of the treatment or program, and secondly, these results can exercise…

  7. A University Program to Improve Nursing Care to the Aged

    ERIC Educational Resources Information Center

    Marten, Marie Lucille

    1978-01-01

    Proposes a series of university nursing education programs developed to increase knowledge and skills relevant to nursing care of elderly and chronically ill persons who reside in nursing homes. Briefly describes five programs intended for persons engaged in long-term care or in preparation for such roles. (EM)

  8. Nonalcoholic fatty liver disease and aging: epidemiology to management.

    PubMed

    Bertolotti, Marco; Lonardo, Amedeo; Mussi, Chiara; Baldelli, Enrica; Pellegrini, Elisa; Ballestri, Stefano; Romagnoli, Dante; Loria, Paola

    2014-10-21

    Nonalcoholic fatty liver disease (NAFLD) is common in the elderly, in whom it carries a more substantial burden of hepatic (nonalcoholic steatohepatitis, cirrhosis and hepatocellular carcinoma) and extra-hepatic manifestations and complications (cardiovascular disease, extrahepatic neoplasms) than in younger age groups. Therefore, proper identification and management of this condition is a major task for clinical geriatricians and geriatric hepatologists. In this paper, the epidemiology and pathophysiology of this condition are reviewed, and a full discussion of the link between NAFLD and the aspects that are peculiar to elderly individuals is provided; these aspects include frailty, multimorbidity, polypharmacy and dementia. The proper treatment strategy will have to consider the peculiarities of geriatric patients, so a multidisciplinary approach is mandatory. Non-pharmacological treatment (diet and physical exercise) has to be tailored individually considering the physical limitations of most elderly people and the need for an adequate caloric supply. Similarly, the choice of drug treatment must carefully balance the benefits and risks in terms of adverse events and pharmacological interactions in the common context of both multiple health conditions and polypharmacy. In conclusion, further epidemiological and pathophysiological insight is warranted. More accurate understanding of the molecular mechanisms of geriatric NAFLD will help in identifying the most appropriate diagnostic and therapeutic approach for individual elderly patients. PMID:25339806

  9. Nonalcoholic fatty liver disease and aging: Epidemiology to management

    PubMed Central

    Bertolotti, Marco; Lonardo, Amedeo; Mussi, Chiara; Baldelli, Enrica; Pellegrini, Elisa; Ballestri, Stefano; Romagnoli, Dante; Loria, Paola

    2014-01-01

    Nonalcoholic fatty liver disease (NAFLD) is common in the elderly, in whom it carries a more substantial burden of hepatic (nonalcoholic steatohepatitis, cirrhosis and hepatocellular carcinoma) and extra-hepatic manifestations and complications (cardiovascular disease, extrahepatic neoplasms) than in younger age groups. Therefore, proper identification and management of this condition is a major task for clinical geriatricians and geriatric hepatologists. In this paper, the epidemiology and pathophysiology of this condition are reviewed, and a full discussion of the link between NAFLD and the aspects that are peculiar to elderly individuals is provided; these aspects include frailty, multimorbidity, polypharmacy and dementia. The proper treatment strategy will have to consider the peculiarities of geriatric patients, so a multidisciplinary approach is mandatory. Non-pharmacological treatment (diet and physical exercise) has to be tailored individually considering the physical limitations of most elderly people and the need for an adequate caloric supply. Similarly, the choice of drug treatment must carefully balance the benefits and risks in terms of adverse events and pharmacological interactions in the common context of both multiple health conditions and polypharmacy. In conclusion, further epidemiological and pathophysiological insight is warranted. More accurate understanding of the molecular mechanisms of geriatric NAFLD will help in identifying the most appropriate diagnostic and therapeutic approach for individual elderly patients. PMID:25339806

  10. Quality programs for waste management research and development

    SciTech Connect

    Hood, F.C.

    1990-06-01

    The Pacific Northwest Laboratory (PNL) is a US Department of Energy (DOE) multi-program national laboratory. PNL develops waste management processes and techniques as well as providing management services for characterization and remediation of radioactive and/or hazardous waste sites for the DOE. This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for error-free'' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. 6 refs.

  11. Reducing environmental noise impacts: A USAREUR noise management program handbook

    NASA Astrophysics Data System (ADS)

    Feather, Timothy D.; Shekell, Ted K.

    1991-06-01

    Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.

  12. Knowledge Management: Education for Information Professionals in the Age of the Mind.

    ERIC Educational Resources Information Center

    Todd, Ross J.; Southon, Gary

    2000-01-01

    Discussion of knowledge management focuses on the program for professional education for knowledge management at the University of Technology, Sydney (Australia). Considers attributes of graduates, industry trends that inform the program, the information-knowledge debate, information management, organizational culture, and learning principles and…

  13. New master program in management in biophotonics and biotechnologies

    NASA Astrophysics Data System (ADS)

    Meglinski, I. V.; Tuchin, V. V.

    2006-08-01

    We develop new graduate educational highly interdisciplinary program that will be useful for addressing problems in worldwide biotechnologies and related biomedical industries. This Master program called Management in Biophotonics and Biotechnologies provides students with the necessary training, education and problem-solving skills to produce managers who are better equipped to handle the challenges of modern business in modern biotechnologies. Administered jointly by Cranfield University (UK) and Saratov State University, Russia) graduates possess a blend of engineering, biotechnologies, business and interpersonal skills necessary for success in industry. The Master courses combine a regular year program in biophotonics & biotechnologies disciplines with the core requirements of a Master degree. A major advantage of the program is that it will provide skills not currently available to graduates in any other program, and it will give the graduates an extra competitive edge for getting a job then.

  14. Programs for the Aging Population. Professional Standards Development.

    ERIC Educational Resources Information Center

    Boarman, A. Marie

    1989-01-01

    This article provides an overview of recent AAHPERD activities in aging and adult development, with emphasis on the need for qualified leaders and practitioners in the areas of physical activity, exercise, health promotion, and recreation for older adults. (IAH)

  15. A randomized controlled trial of a parent training and emotion socialization program for families of hyperactive preschool-aged children.

    PubMed

    Herbert, Sharonne D; Harvey, Elizabeth A; Roberts, Jasmin L; Wichowski, Kayla; Lugo-Candelas, Claudia I

    2013-06-01

    The present study evaluated the effectiveness of a parent training and emotion socialization program designed specifically for hyperactive preschoolers. Participants were 31 preschool-aged children whose parents were randomly assigned to a parent training (PT) or waitlist (WL) control group. PT parents took part in a 14-week parenting program that involved teaching parenting strategies for managing hyperactive and disruptive behavior as well as emotion socialization strategies for improving children's emotion regulation. Compared to WL mothers, PT mothers reported significantly less child inattention, hyperactivity, oppositional defiance, and emotional lability; were observed using significantly more positive and less negative parenting; and reported significantly less maternal verbosity and unsupportive emotion socialization practices. Results provide some support for the effectiveness of this parenting program for reducing attention-deficit hyperactivity disorder (ADHD) symptoms and associated problems in preschool-aged children.

  16. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  17. Evolving medical service in the information age: a legal analysis of applying telemedicine programs in Taiwan.

    PubMed

    Wu, Hsing-Hao

    2008-12-01

    In the face of the information age, Internet and telecommunication technologies have been widely applied in various settings. These innovational technologies have been used in the areas of e-commerce, long distance learning programs, entertainment, e-government, and so on. In recent years, the evolution of Internet technology is also pervading the health care industry. This dramatic trend may significantly alter traditional medical practice as well as the means of delivery of health care. The idea of telemedicine is to use modern information technology as a means or platform to deliver health care service in remote areas and to manage medical information in digitalized forms. The progress of developing telemedicine, however, is rather slow. The main reason for this slow progress is not technological but rather legal. Health care providers are reluctant to promote this innovation in medical service mainly due to uncertain legal consequences and ethical concerns. Although there are many legal challenges surrounding telemedicine, this note will examine major legal issues including licensure, malpractice liability, and privacy protection. Furthermore, I will discuss the potential of applying telemedicine programs in Taiwan's National Health Insurance Program (hereinafter referred to as NHI). PMID:19202856

  18. Stockpile Management Program quarterly report. 2. quarter 1998

    SciTech Connect

    1998-11-01

    The objective of this program is to ensure the safety and reliability of the enduring nuclear weapons stockpile by: (1) maintaining robust nuclear facilities that comprise the infrastructure needed to conduct the various laboratory programs; (2) maintaining capabilities and qualified personnel needed to successfully implement the Program and ensure availability of competencies; (3) meeting present and future production and surveillance requirements to support the enduring stockpile and other programmatic deliverables; and (4) capturing and maintaining expertise and competency in the processes and technologies required to build a complete physics package. Summaries of accomplishments are presented for approximately 30 projects managed under this program.

  19. Alternative management and funding options for aeronautics programs, Task 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Research and technology will be at lower program levels with basic military research for aviation decreasing as fewer aircraft programs are initiated and the present new aircraft programs move into the prototype and production status. The key question is can industry take on the management and financing role and meet the criteria and characteristics considered essential for a viable research and technology program. The criteria for evaluating alternative approaches include an examination of the nature of the product to be provided, responsiveness to changing needs, efficiency in terms of costs, ability to provide leadership, and to provide impartial and independent evaluation of approaches, and to provide technological inputs for regulating functions.

  20. On financial management of population and family planning programs.

    PubMed

    1976-03-01

    In the 3 day workshop of the Southeast Asian Region on the Financial Management of Population/Family Planning Programs held from March 15 to 17 it was recommended that there by standardization of financial reporting procedures by country programs for population planning. Related to this recommendation was the proposal that measurement of cost benefit and cost effective analysis of country programs be undertaken by the Research and Evaluation Units of the respective population organizations in close coordination with the financial managers. Other major recommendations included: 1) closer coordination between donor agencies and policy making bodies of country programs in the disbursement of funds; 2) more exchange of experiences, ideas, technical knowledge on the financial management of country programs in the Inter G overnmental Coordinating Committee for Southeast Asian countries; and 3) inclusion of applicable financial management topics in the training of clinical staff and followup in actual operation. The priority areas identified for the Inter Governmental Coordinating Committee countries (Nepal, Malaysia, Thailand, Singapore, and the Philippines) are financial planning; generation of resources and budgeting and allocation of funds; accounting and disbursement of funds; financial management at the clinic level; use of and control of foreign aid; and cost effectiveness, benefit analysis and financial reporting. PMID:12334205

  1. Graduates' Perspectives on a National Specialized Program in Social Work and Aging

    ERIC Educational Resources Information Center

    Greenfield, Emily A.; Shpiegel, Svetlana

    2012-01-01

    Recognizing the growing need for social workers with specialized training in aging, the Hartford Partnership Program for Aging Education (HPPAE) has developed as a nationwide initiative to enhance aging education for master's-level social work students. This study presents a content analysis of answers to 2 open-ended questions in a national…

  2. Program management of telemental health care services.

    PubMed

    Darkins, A

    2001-01-01

    Telemedicine is a new adjunct to the delivery of health care services that has been applied to a range of health care specialties, including mental health. When prospective telemedicine programs are planned, telemedicine is often envisaged as simply a question of introducing new technology. The development of a robust, sustainable telemental health program involves clinical, technical, and managerial considerations. The major barriers to making this happen are usually how practitioners and patients adapt successfully to the technology and not in the physical installation of telecommunications bandwidth and the associated hardware necessary for teleconsultation. This article outlines the requirements for establishing a viable telemental health service, one that is based on clinical need, practitioner acceptance, technical reliability, and revenue generation. It concludes that the major challenge associated with the implementation of telemental health does not lie in having the idea or in taking the idea to the project stage needed for proof of concept. The major challenge to the widespread adoption of telemental health is paying sufficient attention to the myriad of details needed to integrate models of remote health care delivery into the wider health care system.

  3. A New Class of Risk-Importance Measures to Support Reactor Aging Management and the Prioritization of Materials Degradation Research

    SciTech Connect

    Unwin, Stephen D.; Lowry, Peter P.; Toyooka, Michael Y.

    2010-06-07

    As the US fleet of light water reactors ages, the risks of operation might be expected to increase. Although probabilistic risk assessment has proven a critical resource in risk-informed regulatory decision-making, limitations in current methods and models have constrained their prospective value in reactor aging management. These limitations stem principally from the use of static component failure rate models (which do not allow the impact of component aging on failure rates to be represented) and a very limited treatment of passive components (which would be expected to have an increasingly significant risk contribution in an aging system). Yet, a PRA captures a substantial knowledge base that could be of significant value in addressing plant aging. In this paper we will describe a methodology and a new class of risk importance measures that allow the use of an existing PRA model to support the management of plant aging, the prioritization of improvements to non-destructive examination and monitoring techniques, and the establishment of research emphases in materials science. This methodology makes use of data resources generated under the USNRC Proactive Management of Materials Degradation program which addresses the anticipated effects of numerous aging degradation mechanisms on a wide variety of component types.

  4. A Vocal Hygiene Program for School-Age Children.

    ERIC Educational Resources Information Center

    Cook, Joy V.; And Others

    1979-01-01

    Thirty-eight elementary grade school children with hoarse voices participated in a six-lesson, cartoon-illustrated vocal hygiene program that provided information concerning the human voice, voice quality, vocal abuse, and proper use of the voice. (Author)

  5. Fire-resistant fuel program analysis and program management documentation. Final report, December 1985-January 1986

    SciTech Connect

    Dye, C.A.

    1986-01-31

    There was an urgent need to transition management of the Fire Resistant Fuel (FRF) Program from the Materials Fuels and Lubricants Laboratory (MFLL) to the Logistics Support Directorate (LSD). It is recommended that the LSD develop program management documentation (PMD) that supports a Milestone I review as soon as possible to include the following: System Concept Paper, Concept Formulation Package and a Test Evaluation Master Plan. This report describes programmatic analyses and subsequent programmatic recommendations.

  6. Information Management Strategies for Program Tracking and Formative Evaluation

    NASA Astrophysics Data System (ADS)

    Siegfried, D.; Detrick, L.; Valaitis, S.; Johnson, A.; Thomas, S. H.; Fauver, A.

    2013-05-01

    The Institute for Broadening Participation (IBP) has developed information management systems to facilitate programmatic formative evaluation, tracking and outreach activities. Nearly a decade of design solutions and technical implementations in support of IBP's professional development and mentoring programs for students (including the "Pathways to Ocean Science," "Minorities Striving and Pursuing Higher Degrees of Success" in Earth System Science, and "Pathways to Engineering") has provided IBP with a toolbox of proven strategies for addressing program engagement and participant tracking, outreach, and a variety of other information management needs. In this session, IBP will use case-specific examples to share general design strategies for program participant and activities data collection in REUs and other program types. The cases will illustrate an approach that begins with a review of program logic, objectives, expected outcomes, constraints and requirements, which then informs a comprehensive system design. When implemented, such information systems improve administrative efficiency through streamlined data collection processes and easy-to-use data capture forms, and a corresponding set of reporting tools provides access to data that is crucial for ongoing program improvement. IBP presents this information in response to collaborations with administrators of Research Experience for Undergraduates (REU) programs as well as longer duration programs, who have expressed the need for more comprehensive and easy to use information systems. Recently IBP has also worked with the directors of NSF and NASA funded programs seeking assistance in addressing their formative evaluation needs including system design, information collection, and reporting efforts.

  7. Heart Failure Update: Chronic Disease Management Programs.

    PubMed

    Fountain, Lorna B

    2016-03-01

    With high mortality and readmission rates among patients with heart failure (HF), multiple disease management models have been and continue to be tested, with mixed results. Early postdischarge care improves outcomes for patients. Telemonitoring also can assist in reducing mortality and HF-related hospitalizations. Office-based team care improves patient outcomes, with important components including rapid access to physicians, partnerships with clinical pharmacists, education, monitoring, and support. Pay-for-performance measures developed for HF, primarily use of angiotensin-converting enzyme inhibitors and beta blockers, also improve patient outcomes, but the influence of adherence to other measures has been minimal. Evaluating comorbid conditions, including diabetes and hypertension, and making drug adjustments for patients with HF to include blood pressure control and use of metformin, when possible, can reduce mortality and morbidity. PMID:26974003

  8. Heart Failure Update: Chronic Disease Management Programs.

    PubMed

    Fountain, Lorna B

    2016-03-01

    With high mortality and readmission rates among patients with heart failure (HF), multiple disease management models have been and continue to be tested, with mixed results. Early postdischarge care improves outcomes for patients. Telemonitoring also can assist in reducing mortality and HF-related hospitalizations. Office-based team care improves patient outcomes, with important components including rapid access to physicians, partnerships with clinical pharmacists, education, monitoring, and support. Pay-for-performance measures developed for HF, primarily use of angiotensin-converting enzyme inhibitors and beta blockers, also improve patient outcomes, but the influence of adherence to other measures has been minimal. Evaluating comorbid conditions, including diabetes and hypertension, and making drug adjustments for patients with HF to include blood pressure control and use of metformin, when possible, can reduce mortality and morbidity.

  9. Organic tanks safety program FY96 waste aging studies

    SciTech Connect

    Camaioni, D.M.; Samuels, W.D.; Linehan, J.C.; Clauss, S.A.; Sharma, A.K.; Wahl, K.L.; Campbell, J.A.

    1996-10-01

    Uranium and plutonium production at the Hanford Site produced large quantities of radioactive by-products and contaminated process chemicals, which are stored in underground tanks awaiting treatment and disposal. Having been made strongly alkaline and then subjected to successive water evaporation campaigns to increase storage capacity, the wastes now exist in the physical forms of salt cakes, metal oxide sludges, and partially saturated aqueous brine solutions. The tanks that contain organic process chemicals mixed with nitrate/nitrite salt wastes may be at risk for fuel- nitrate combustion accidents. The purpose of the Waste Aging Task is to elucidate how chemical and radiological processes will have aged or degraded the organic compounds stored in the tanks. Ultimately, the task seeks to develop quantitative measures of how aging changes the energetic properties of the wastes. This information will directly support efforts to evaluate the hazard as well as to develop potential control and mitigation strategies.

  10. Paul B. Beeson career development awards in aging research and U.S. medical schools aging and geriatric medicine programs.

    PubMed

    Bragg, Elizabeth J; Warshaw, Gregg A; van der Willik, Odette; Meganathan, Karthikeyan; Weber, Debra; Cornwall, Danielle; Leonard, Anthony C

    2011-09-01

    Established in 1995, the Paul B. Beeson Career Development program provides faculty development awards to outstanding junior and midcareer faculty committed to academic careers in aging-related research, training, and practice. This study evaluated the effect of 134 Beeson Scholars on their medical schools' aging and geriatric medicine programs and on the field of aging research from 1995 to 2007. Quantitative and qualitative survey data from multiple sources, including the American Geriatrics Society/Association of Directors of Geriatric Academic Programs' Geriatrics Workforce Policy Studies Center, National Institutes of Health (NIH) rankings of research funding, and other governmental databases were used to compare 36 medical schools with Beeson Scholars with 34 similar medical schools without Beeson scholars and to examine the influence of Beeson Scholars on the field of geriatrics and aging. Most Beeson Scholars remained at the institution where they trained during their Beeson award, and 89% are still practicing or conducting research in the field of geriatrics and aging. Twenty-six (19.4%) of the scholars have led institutional research mentoring awards, 51 (39%) report leadership roles in institutional program project grants, and 13 (10%) report leadership roles in the Clinical and Translational Science Award programs at their institutions. Beeson Scholars are more likely than a matched sample of non-Beeson NIH K awardees to study important geriatric syndromes such as falls, cognitive impairment, adverse drug events, osteoporosis, and functional recovery from illness. Total Beeson Impact Years (the total number of years all Beeson Scholars have worked at each school) is positively correlated with more geriatrics research faculty, after controlling for NIH funding rank (P=.02). Beeson Scholars have made positive contributions to the development of academic geriatrics research programs at U.S. medical schools. PMID:21806567

  11. Aging and Mental Health Certificate Program. Final Report 1979-1983.

    ERIC Educational Resources Information Center

    Glazek, Marianne S.; And Others

    Following a brief overview on the program and grant proposal process, this paper describes the design and implementation of the Aging and Mental Health Certification Program at Madonna College in Livonia, Michigan. The project goals (to design a program, to prepare 120 trainees, to meet community and trainee needs) and accomplishment of the goals…

  12. Subjective Experiences of Clients in a Voluntary Money Management Program

    PubMed Central

    Serowik, Kristin L.; Bellamy, Chyrell D.; Rowe, Michael; Rosen, Marc I.

    2013-01-01

    A large proportion of people diagnosed with mental illnesses have difficulty managing their money, and therefore many psychiatric treatments involve providing money management assistance. However, little is known about the subjective experience of having a money manager, and extant literature is restricted to people forced to work with a representative payee or conservator. In this study, fifteen people were interviewed about their experience receiving a voluntary money management intervention designed to minimize substance use. Clients emphasized the importance of trusting the money manager, financial mindfulness (an enhanced awareness of the financial transactions in clients’ day-to-day lives), agency over their own affairs, and addiction. In contrast to evaluations of people assigned representative payees and/or conservators, there was little mention of feeling coerced. These findings suggest that money management programs can address client concerns by building trust, relating budgeting to clients’ day-to-day lives, and encouraging clients’ control over their own affairs. PMID:24605071

  13. Integrated Risk and Knowledge Management Program -- IRKM-P

    NASA Technical Reports Server (NTRS)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  14. Subjective Experiences of Clients in a Voluntary Money Management Program.

    PubMed

    Serowik, Kristin L; Bellamy, Chyrell D; Rowe, Michael; Rosen, Marc I

    2013-01-01

    A large proportion of people diagnosed with mental illnesses have difficulty managing their money, and therefore many psychiatric treatments involve providing money management assistance. However, little is known about the subjective experience of having a money manager, and extant literature is restricted to people forced to work with a representative payee or conservator. In this study, fifteen people were interviewed about their experience receiving a voluntary money management intervention designed to minimize substance use. Clients emphasized the importance of trusting the money manager, financial mindfulness (an enhanced awareness of the financial transactions in clients' day-to-day lives), agency over their own affairs, and addiction. In contrast to evaluations of people assigned representative payees and/or conservators, there was little mention of feeling coerced. These findings suggest that money management programs can address client concerns by building trust, relating budgeting to clients' day-to-day lives, and encouraging clients' control over their own affairs.

  15. Management Development Program. A Review of the Program's Goals and Accomplishments, 1980-1984. Internal Report.

    ERIC Educational Resources Information Center

    Cloud, Sherrill

    The goals and accomplishments of the Management Development Program, which was operated by the National Center for Higher Education Management System with funds from the National Institute of Education, are reported. Twenty-eight seminar/institute topics were developed from 1980 through 1983 to address planning-level issues of importance to…

  16. Managing state energy conservation programs - The Minnesota experience

    NASA Astrophysics Data System (ADS)

    Hirst, E.; Armstrong, J. R.

    1980-11-01

    The development and operation of energy conservation programs in the Minnesota Energy Agency (MEA) are discussed. The MEA has responsibility for voluntary conservation efforts, regulating energy efficient devices, and grant programs to audit and retrofit public buildings. The MEA has developed the plan under which the Minnesota utilities will provide conservation services to residential customers, including an on-site home energy audit. The relation between the Department of Energy (DOE) and state energy offices in implementing programs is considered. The DOE has provided technical assistance to the states through the development of a model audit. Steps are discussed to reduce the burdens imposed on the states by program planning, funding, and management responsibilities, including the consolidation of several existing state conservation programs. Improved policy analysis is suggested to correct inefficiencies in government programs.

  17. 76 FR 34541 - Child and Adult Care Food Program Improving Management and Program Integrity

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... these two interim rules by family day care home sponsors and providers. This rule clarifies or modifies... improve Program management and integrity in the Child and Adult Care Food Program (CACFP), at 67 FR 43447... designed to evaluate implementation of the new regulatory requirements by family day care home sponsors...

  18. Examining Strategies to Build and Sustain Healthy Aging Programming Collaboratives

    ERIC Educational Resources Information Center

    Altpeter, Mary; Schneider, Ellen Caylor; Whitelaw, Nancy

    2014-01-01

    Background: Community collaboratives provide a means to build local capacity, reduce service fragmentation and duplication, maximize efficiency, and create synergies for "systems change". But what are the collaborative practices that aging services providers and other stakeholders employ for "system change" and…

  19. Development of a Chronic Care Ostomy Self Management Program

    PubMed Central

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C.; Wendel, Christopher S.; Krouse, Robert

    2012-01-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self Management Program, which was informed by (1) evidence on published quality of life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies. PMID:23104143

  20. Development of a chronic care ostomy self-management program.

    PubMed

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C; Wendel, Christopher S; Krouse, Robert

    2013-03-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long-term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self-Management Program, which was informed by (1) evidence on published quality-of-life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self-Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies.