Science.gov

Sample records for agreement de-fc26-01nt41185 epri

  1. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2003-01-21

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems, during the time period October 1, 2002 through December 31, 2002. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project co-funders. URS Group is the prime contractor. The mercury catalytic oxidation process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates with the byproducts from the FGD system. The co-precipitated mercury does not appear to adversely affect the disposal or reuse properties of the FGD byproduct. The current project testing previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, to provide engineering data for future fullscale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the fifth full reporting period for the subject Cooperative Agreement. During this period, project efforts included starting up the pilot unit with three catalysts at the first site, conducting catalyst activity measurements, completing comprehensive flue gas sampling and analyses, and procuring additional catalysts for the pilot unit. This technical progress report provides an update on these efforts.

  2. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2002-07-17

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems, during the time period April 1, 2002 through June 30, 2002. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project co-funders. URS Group is the prime contractor. The mercury catalytic oxidation process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates in a stable form with the byproducts from the FGD system. The co-precipitated mercury does not appear to adversely affect the disposal or reuse properties of the FGD byproduct. The current project will test previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, so as to provide engineering data for future full-scale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the third full reporting period for the subject Cooperative Agreement. During this period, most of the project efforts were related to constructing the pilot unit and conducting laboratory runs to help size catalysts for the pilot unit. This technical progress report provides an update on these two efforts.

  3. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2002-10-04

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems, during the time period July 1, 2002 through September 30, 2002. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project co-funders. URS Group is the prime contractor. The mercury catalytic oxidation process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates in a stable form with the byproducts from the FGD system. The coprecipitated mercury does not appear to adversely affect the disposal or reuse properties of the FGD byproduct. The current project will test previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, so as to provide engineering data for future full-scale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the fourth full reporting period for the subject Cooperative Agreement. During this period, most of the project efforts were related to completing, installing and starting up the pilot unit, completing laboratory runs to size catalysts, and procuring catalysts for the pilot unit. This technical progress report provides an update on these efforts.

  4. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2003-07-01

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,'' during the time-period April 1, 2003 through June 30, 2003. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project cofunders. URS Group is the prime contractor. The mercury control process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates with the byproducts from the FGD system. The current project is testing previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, to provide engineering data for future full-scale designs. The pilot-scale tests will continue for approximately 14 months at each of two sites to provide longer-term catalyst life data. This is the seventh full reporting period for the subject Cooperative Agreement. During this period, project efforts included continued operation of the first pilot unit, conducting catalyst activity measurements, installing sonic horns for on-line catalyst cleaning, and installing the fourth catalyst, all for the GRE Coal Creek site. CPS began installation of the second mercury oxidation catalyst pilot unit at their Spruce Plant during the quarter. Laboratory efforts were conducted to support catalyst selection for that second pilot unit. This technical progress report provides an update on these efforts.

  5. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2003-05-01

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,'' during the time period January 1, 2003 through March 31, 2003. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project cofunders. URS Group is the prime contractor. The mercury control process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates with the byproducts from the FGD system. The current project is testing previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, to provide engineering data for future full-scale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the sixth full reporting period for the subject Cooperative Agreement. During this period, project efforts included continued operation of the pilot unit with three catalysts, conducting catalyst activity measurements, and procuring the fourth catalyst, all for the GRE Coal Creek pilot unit site. Laboratory efforts were also conducted to support catalyst selection for the second pilot unit site, at CPS' Spruce Plant. This technical progress report provides an update on these efforts.

  6. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2003-10-01

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,'' during the time-period July 1, 2003 through September 30, 2003. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project cofunders. URS Group is the prime contractor. The mercury control process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates with the byproducts from the FGD system. The current project is testing previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, to provide engineering data for future full-scale designs. The pilot-scale tests will continue for approximately 14 months at each of two sites to provide longer-term catalyst life data. This is the eighth full reporting period for the subject Cooperative Agreement. During this period, project efforts included continued operation of the first pilot unit at the GRE Coal Creek site with all four catalysts in service and sonic horns installed for on-line catalyst cleaning. During the quarter, a catalyst activity measurement trip and mercury SCEM relative accuracy tests were completed, and catalyst pressure drop was closely monitored with the sonic horns in operation. CPS completed the installation of the second mercury oxidation catalyst pilot unit at their Spruce Plant during the quarter, and the four

  7. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2002-04-26

    This document summarizes progress on Cooperative Agreement DE-FC26-01NT41185, Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems, during the time period January 1, 2002 through March 31, 2002. The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE) and City Public Service (CPS) of San Antonio are project co-funders. URS Group is the prime contractor. The mercury catalytic oxidation process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates in a stable form with the byproducts from the FGD system. The co-precipitated mercury does not appear to adversely affect the disposal or reuse properties of the FGD byproduct. The current project will test previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, so as to provide engineering data for future full-scale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the second full reporting period for the subject Cooperative Agreement. During this period, most of the project efforts were related to pilot unit design and conducting laboratory runs to help select candidate catalysts. This technical progress report provides an update on these two efforts. A Test Plan for the upcoming pilot-scale evaluations was also prepared and submitted to NETL for review and comment. Since this document was already submitted under separate cover, this

  8. FETC/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    SciTech Connect

    D. TILLMAN; E. HUGHES

    1998-08-01

    This quarter much progress was made in promoting cofiring through the many FETC/EPRI backed projects. During January 1, 1998 to March 31st, 1998 significant contractual agreements were arranged for future testing and analyses of previous testing were conducted. Most notable was the analysis done on the testing run at the Tennessee Valley Authority�s Colbert Fossil Plant that showed no significant impacts to the plant boiler due to cofiring. Northern Indiana Public Service Company also identified Bailly #7 as the site of the next series of tests using their plants. Other work done on these projects primarily focused on continued cofiring development. This report summarizes the activities during the first quarter in 1998 of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing in order to highlight the progress at utilities.

  9. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    SciTech Connect

    D. Tillman; E. Hughes

    1999-04-01

    During the period of January 1, 1999 through March 31, 1999, construction was performed in support of two major demonstrations. Major progress was made on several projects including cofiring at Seward (GPU Genco), and Bailly (NIPSCO). Most of the work was focused on construction and system commissioning activities at the Seward and Bailly Generating Stations. Additionally, petroleum coke cofiring testing was completed at the Bailly Generating Station. This report summarizes the activities during the first calendar quarter in 1999--the fourth contract quarter in 1998--of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction activities and related events.

  10. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    SciTech Connect

    E. Hughes; D. Tillman

    2000-10-01

    During the period of July 1, 2000 through September 30, 2000, alternatives for relocating the Seward Generating Station cofiring project were investigated. Allegheny Energy Supply Company LLC will accept the separate injection demonstration at its Albright Generating Station. During this period, also, efforts were made at program outreach. Papers were given at the Pittsburgh Coal Conference. This report summarizes the activities during the second calendar quarter in 2000 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of the relocation of Seward, and on the outreach efforts.

  11. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    SciTech Connect

    E. Hughes; D. Tillman

    2000-07-01

    During the period of April 1, 2000 through June 30, 2000, alternatives for relocating the Seward Generating Station cofiring project were investigated. A test was conducted at Bailly Generating Station of Northern Indiana Public Service Co., firing a blend of Black Thunder (Powder River Basin) coal and Illinois basin coal, in cyclone boiler designed for Illinois basin coal. This test at Bailly was designed to determine the technical feasibility of cofiring at that station using PRB coals. This report summarizes the activities during the second calendar quarter in 2000 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction and testing activities at these generating stations.

  12. FETC/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    SciTech Connect

    D. TILLMAN; E. HUGHES

    1998-08-01

    During April 1 st , 1998 to June 31 st , 1998, significant work was done in preparation for a series of test involving cofiring at power plants. A biomass material handling system was designed for the Seward testing, a gasification system was designed for the Allen Fossil Plant, and a test program plan was developed for testing at NIPSCO�s Bailly Station. Also completed this quarter was a cyclone combustion model that provides a color visual representation of estimated temperatures within a plant. This report summarizes the activities during the second quarter in 1998 of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing in order to highlight the progress at utilities.

  13. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    SciTech Connect

    D. Tillman; E. Hughes

    1999-01-01

    During the period of October 1, 1998 through December 31, 1998, significant work was done in direct preparation for several cofiring tests. Major progress was made on several projects including cofiring at Seward (GPU Genco), Allen (TVA), and Bailly (NIPSCO). Most of the work was focused on construction activities at the Seward and Bailly Generating Stations. The conceptual design and feasibility study for gasification-based cofiring at the Allen Fossil Plant was completed. The feasibility study for cofiring at the Pirkey and Northeastern Generating Stations of Central and South West Utilities (C&SW) also was completed. This report summarizes the activities during the fourth calendar quarter in 1998--of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction activities and related events.

  14. PILOT TESTING OF MERCURY OXIDATION CATALYSTS FOR UPSTREAM OF WET FGD SYSTEMS

    SciTech Connect

    Gary M. Blythe

    2002-02-22

    The objective of this project is to demonstrate at pilot scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. The project is being funded by the U.S. DOE National Energy Technology Laboratory under Cooperative Agreement DE-FC26-01NT41185. EPRI, Great River Energy (GRE), and City Public Service (CPS) of San Antonio are project co-funders. URS Group is the prime contractor. The mercury catalytic oxidation process under development uses catalyst materials applied to honeycomb substrates to promote the oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone flue gas desulfurization (FGD) systems. Oxidized mercury is removed in the wet FGD absorbers and co-precipitates in a stable form with the byproducts from the FGD system. The co-precipitated mercury does not appear to adversely affect the disposal or reuse properties of the FGD byproduct. The current project will test previously identified, effective catalyst materials at a larger, pilot scale and in a commercial form, so as to provide engineering data for future full-scale designs. The pilot-scale tests will continue for up to 14 months at each of two sites to provide longer-term catalyst life data. This is the first full reporting period for the subject Cooperative Agreement. During this period, most of the project efforts were related to project initiation and planning. There is no significant technical progress to report for the current period.

  15. EPRI PEAC Corp.: Certification Model Program and Interconnection Agreement Tools

    SciTech Connect

    Not Available

    2003-10-01

    Summarizes the work of EPRI PEAC Corp., under contract to DOE's Distribution and Interconnection R&D, to develop a certification model program and interconnection agreement tools to support the interconnection of distributed energy resources.

  16. EPRI-USDOE COOPERATIVE AGREEMENT: COFIRING BIOMASS WITH COAL

    SciTech Connect

    David A. Tillman

    2001-09-01

    The entire Electric Power Research Institute (EPRI) cofiring program has been in existence of some 9 years. This report presents a summary of the major elements of that program, focusing upon the following questions: (1) In pursuit of increased use of renewable energy in the US economy, why was electricity generation considered the most promising target, and why was cofiring pursued as the most effective near-term technology to use in broadening the use of biomass within the electricity generating arena? (2) What were the unique accomplishments of EPRI before the development of the Cooperative Agreement, which made developing the partnership with EPRI a highly cost-effective approach for USDOE? (3) What were the key accomplishments of the Cooperative Agreement in the development and execution of test and demonstration programs-accomplishments which significantly furthered the process of commercializing cofiring?

  17. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, July 1-September 30, 1997

    SciTech Connect

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has completed one year of activity, accelerating the pace of cofiring development. Cofiring tests were completed at the Seward Generating Station of GPU Genco and at the Michigan City Generating Station of NIPSCO. The NYSEG work at Greenidge Station resulted in a workable, low cost method for injecting biofuels into coal-fired PC boilers. Support studies and modeling continued to provide analytics for the cofiring program. This report summarizes the activities during the fourth quarter of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon the results of testing in order to highlight the progress at utilities.

  18. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    SciTech Connect

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Among these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.

  19. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quaterly technical report, January 1-March 30m 1997

    SciTech Connect

    Hughes, E.; Tillman, D.

    1997-12-01

    Cofiring is considered to be the most promising near-term approach to fossil C0{sub 2} emissions mitigation through biomass usage. Consequently FETC and EPRI have entered into a cooperative agreement: `Cofiring Biomass and Waste-Derived fuels in Electric Utility Coal- Fired Boilers.` This agreement supports sixteen (16) EPRI research projects, each contributing to the commercialization of systems to address greenhouse gas emissions. These projects include: (1) cofiring combustion testing at the Seward Generating Station of GPU Genco; (2) fuel preparation testing at the Greenidge Generating Station of NYSEG; (3) precommercial testing of cofiring at the Allen and Colbert Fossil Plants of TVA; (4) testing of switchgrass cofiring at the Blount St. Station of Madison Gas & Electric; (5) high percentage biomass cofiring with Southern Company; (6) urban wood waste cofiring at the supercritical cyclone boiler at Michigan City Generating Station of Northern Indiana Public Service Co. (NIPSCO); (7) evaluation of switchgrass cofiring with Nebraska Public Power District at Sandia National Laboratories in Livermore, CA; (8) waste plastics cofiring with Duke Power in a tangentially-fired pulverized coal (PC) boiler; (9) cofiring a mixture of plastics, fiber, and pulp industry wastes with South Carolina Electric and Gas; (10) urban wood waste cofiring evaluation and testing by the University of Pittsburgh in stoker boilers; (11) assessment of toxic emissions from cofiring of wood and coal; (12) development of fuel and power plant models for analysis and interpretation of cofiring results; (13) analysis of C0{sub 2} utilization in algal systems for wastewater treatment; (14) combustion testing and combustor development focusing on high percentage cofiring; (15) analysis of problems and potential solutions to the sale of flyash from coal-fired boilers practicing cofiring; and (16) analysis of C0{sub 2} capture and disposal systems. During the second quarter of this contract, from

  20. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, September 26-December 31, 1996

    SciTech Connect

    Hughes, E. Tillman, D.

    1997-12-01

    Biomass utilization to reduce fossil C0{sub 2} emissions is being supported by sixteen (16) EPRI research projects, each contributing to the commercialization of systems to address greenhouse gas emissions. These projects include: (1) cofiring combustion testing at the Seward Generating Station of GPU Genco; (2) fuel preparation testing at the Greenidge Generating Station of NYSEG; (3) precommercial testing of cofiring at the Allen and Colbert Fossil Plants of TVA; (4) testing of switchgrass cofiring at the Blount St. Station of Madison Gas & Electric; (5) high percentage biomass cofiring with Southern Company; (6) urban wood waste cofiring at the supercritical cyclone boiler at Michigan City Generating Station of Northern Indiana Public Service Co. (NIPSCO); (7) evaluation of switchgrass cofiring with Nebraska Public Power District at Sandia National Laboratories in Livermore, CA; (8) waste plastics cofiring with Duke Power in a tangentially-fired pulverized coal (PC) boiler; (9) cofiring a mixture of plastics, fiber, and pulp industry wastes with South Carolina Electric and Gas; (10) urban wood waste cofiring evaluation and testing by the University of Pittsburgh in stoker boilers; (11) assessment of toxic emissions from cofiring of wood and coal; (12) development of fuel and power plant models for analysis and interpretation of cofiring results; (13) analysis of C0{sub 2} utilization in algal systems for wastewater treatment; (14) combustion testing and combustor development focusing on high percentage cofiring; (15) analysis of problems and potential solutions to the sale of flyash from coal- fired boilers practicing cofiring; and (16) analysis of C0{sub 2} capture and disposal systems. EPRI is supported in these efforts by numerous contractors including: Foster Wheeler Environmental Corporation, Battelle Columbus Laboratories, New York State Electric and Gas Co., Tennessee Valley Authority (TVA), NIPSCO, the University of Pittsburgh, John Benneman, and others

  1. Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems

    SciTech Connect

    Richard Rhudy

    2006-06-30

    This final report presents and discusses results from a mercury control process development project entitled ''Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems''. The objective of this project was to demonstrate at pilot scale a mercury control technology that uses solid honeycomb catalysts to promote the oxidation of elemental mercury in the flue gas from coal combustion. Oxidized mercury is removed in downstream wet flue gas desulfurization (FGD) absorbers and leaves with the FGD byproducts. The goal of the project was to achieve 90% oxidation of elemental mercury in the flue gas and 90% overall mercury capture with the downstream wet FGD system. The project was co-funded by EPRI and the U.S. Department of Energy's National Energy Technology Laboratory (DOE NETL) under Cooperative Agreement DE-FC26-01NT41185. Great River Energy (GRE) and City Public Service (now CPS Energy) of San Antonio were also project co-funders and provided host sites. URS Group, Inc. was the prime contractor. Longer-term pilot-scale tests were conducted at two sites to provide catalyst life data. GRE provided the first site, at their Coal Creek Station (CCS), which fires North Dakota lignite, and CPS Energy provided the second site, at their Spruce Plant, which fires Powder River Basin (PRB) coal. Mercury oxidation catalyst testing began at CCS in October 2002 and continued through the end of June 2004, representing nearly 21 months of catalyst operation. An important finding was that, even though the mercury oxidation catalyst pilot unit was installed downstream of a high-efficiency ESP, fly ash buildup began to plug flue gas flow through the horizontal catalyst cells. Sonic horns were installed in each catalyst compartment and appeared to limit fly ash buildup. A palladium-based catalyst showed initial elemental mercury oxidation percentages of 95% across the catalyst, declining to 67% after 21 months in service. A carbon-based catalyst began with almost 98

  2. EPRI fuel cladding integrity program

    SciTech Connect

    Yang, R.

    1997-01-01

    The objectives of the EPRI fuel program is to supplement the fuel vendor research to assure that utility economic and operational interests are met. To accomplish such objectives, EPRI has conducted research and development efforts to (1) reduce fuel failure rates and mitigate the impact of fuel failures on plant operation, (2) provide technology to extend burnup and reduce fuel cycle cost. The scope of R&D includes fuel and cladding. In this paper, only R&D related to cladding integrity will be covered. Specific areas aimed at improving fuel cladding integrity include: (1) Fuel Reliability Data Base; (2) Operational Guidance for Defective Fuel; (3) Impact of Water Chemistry on Cladding Integrity; (4) Cladding Corrosion Data and Model; (5) Cladding Mechanical Properties; and (6) Transient Fuel Cladding Response.

  3. EPRI studies Legionella in electric water heaters

    SciTech Connect

    1995-11-01

    Home electric water heaters were found not to be a major risk factor for Legionnaires` disease in a 2-year study conducted recently in Ohio. EPRI has published the final report of the project, and a scientific paper on the study will soon appear in a major medical journal. The research was sponsored by EPRI`s Environmental and Health Sciences business Unit and the Federal Centers for Disease Control and Prevention (CDC), with cofunding from the Canadian Electrical Association.

  4. 1985 EPRI cogeneration symposium. Proceedings

    SciTech Connect

    Limaye, D.R.

    1986-03-01

    In April 1985, EPRI sponsored a two-day Symposium on cogeneration to examine the major issues of current interest to utilities. The Symposium, held in San Diego, California, provided a forum for the review and exchange of information on the recent cogeneration experiences of utilities. Specific topics discussed included Cogeneration as a Utility Planning Option, Assessing Cogeneration Potential, Utility Participation in Cogeneration Ventures, and Negotiating Cogeneration Contracts. Some of the critical issues relative to cogeneration from the utility perspective were also explored in case studies, panel discussions, and question/answer sessions. A workshop on future research needs was also included.

  5. Proceedings: 1987 EPRI radwaste workshop

    SciTech Connect

    Coplan, B.V.

    1988-10-01

    The proceedings of the ninth EPRI radwaste workshop are presented. The workshop presentations followed by discussion sessions addressed wet waste minimization, installed radwaste equipment improvements, and dry active waste volume reduction. Under wet waste minimization, the presentations included bodyfeed addition to condensate polishing, root cause analysis, precoat filter optimization and evaluation of selective ion exchange. Installed radwaste equipment improvement lectures discussed project management of radwaste retrofits, hollow fiber filters and the design and construction of a solidification and dewatering facility at the Farley nuclear plant of Alabama Power Co. Reduction of dry active waste volume included presentations on alternative disposal of very low level radioactive waste, the waste segregation program at River Bend, Florida Power and Light's radwaste minimization program and the radwaste minimization program at the H.B. Robinson station. The program also included updates on the EPRI Below Regulatory Concern program, the operations at the Beatty, Richland and Barnwell disposal sites and a presentation on the operational impact of regulatory policy on mixed waste. Individual papers were processed separately for the data base.

  6. Proceedings: 1986 EPRI cogeneration symposium

    SciTech Connect

    Limaye, D.R.

    1987-06-01

    On October 14-15, 1986, EPRI sponsored a Symposium on cogeneration to examine the major issues of current interest to utilities. The Symposium, held in Washington, DC, provided a forum for the review and exchange of information on the recent cogeneration experiences of utilities. Specific topics discussed were federal cogeneration regulations and their impacts on utilities, cogeneration trends and prospects, utility leadership in cogeneration ventures, strategic utility planning relative to cogeneration, small cogeneration: implications for utilities; and electric alternatives to cogeneration. Some of the critical issues relative to cogeneration from the utility perspective were explored in case studies, discussions and question/answer sessions. This report contains the 24 papers presented and discussed at the Symposium. They are processed separately for the data base.

  7. Review of EPRI Nuclear Human Factors Program

    SciTech Connect

    Hanes, L.F.; O`Brien, J.F.

    1996-03-01

    The Electric Power Research Institute (EPRI) Human Factors Program, which is part of the EPRI Nuclear Power Group, was established in 1975. Over the years, the Program has changed emphasis based on the shifting priorities and needs of the commercial nuclear power industry. The Program has produced many important products that provide significant safety and economic benefits for EPRI member utilities. This presentation will provide a brief history of the Program and products. Current projects and products that have been released recently will be mentioned.

  8. Earth Penetration Radar Imaging System (EPRIS)

    NASA Astrophysics Data System (ADS)

    1993-08-01

    The Earth Penetration Radar Imaging System (EPRIS) has been developed and has the capability to detect and locate buried mines, buried ordnance delivered by precision munitions, buried drums, buried waste/contaminants, and geological structures/features. The detected objects or features are mapped in three dimensions with high resolution. This information is then available for integration into a site characterization study. The EPRIS is a significant improvement in non-intrusive sensing and imaging capability. This phase of the EPRIS development has been extremely successful. Coleman Research Corporation (CRC) has implemented significant advances in technology into the EPRIS equipment. The frequency stepped radar sensor design has a very wide dynamic signal range and improved sensitivity over currently available equipment. The two- and three-dimensional image processing algorithms allow high-resolution placement and sizing of buried objects and/or features. The discussions related to the analog-to-digital converter and the spiral antenna, define the source of the dynamic range capability realized by EPRIS. The processing for this new radar makes use of unique synthetic aperature imaging (SAI) algorithms developed by CRC for frequency stepped radar systems. The SAI algorithms are necessary to obtain excellent spatial resolution on objects buried up to seven meters. The sensor signal processing represents a significant improvement in imaging systems. The CRC test facility permitted tests on objects buried up to 2.44 meters.

  9. EPRI dam safety workshop summary: Proceedings

    SciTech Connect

    Corso, R.

    1998-10-01

    The Electric Power Research Institute (EPRI) has an extensive history of working with utilities, federal and state agencies, consultants, and other interests to conduct a number of workshops and studies to improve the safety of dams. Through these efforts, EPRI has developed a number of tools to assist dam owners, particularly EPRI members, in the evaluation and modification of dams. Although a considerable amount of progress has been made toward improving dam safety, there remain among the over 75,000 dams in the US a significant number of structures that require in-depth evaluation and possible modifications. At the same time, there are pressures from several directions to prioritize dam safety issues and find cost-effective solutions to problems because there seems to be an ever-decreasing amount of funds to address dam safety. In that regard, EPRI is sensitive to those cost considerations in a changing utility environment. Therefore, EPRI recently entered into discussions with utilities, regulatory agencies, federal agencies (dam owners), and others interested in dam safety issues. From those discussions, a number of research ideas were developed, which were distilled into three primary topics and several secondary topics of importance. The three primary areas of concern included: penstocks, tunnels, and gates; instrumentation and monitoring; and post-tensioned anchors. This report will provide a review of the workshop and insight on ideas for future dam safety R and D.

  10. Biological effects of electric fields: EPRI's role

    SciTech Connect

    Kavet, R.

    1982-07-01

    Since 1973 the Electric Power Research Institute (EPRI) has supported research to evaluate the biological effects which may result from exposure to electric fields produced by AC overhead transmission lines; more recently, EPRI has also begun DC research. Through 1981 EPRI will have expended $8.7M on these efforts. Ongoing AC projects are studying a variety of lifeforms exposed to electric fields; these include humans, miniature swine, rats, honeybees, chick embryos, and crops. The status of these projects is discussed. The DC program has not as yet produced data. These studies will add to the current data base so as to enable a more complete assessment of health risks which may be associated with exposure to electric fields at power frequencies.

  11. Proceedings: EPRI Manufactured Gas Plants 2003 Forum

    SciTech Connect

    2004-02-01

    The EPRI Manufactured Gas Plants 2003 Forum covered a range of topics related to remediation and management of former manufactured gas plant (MGP) sites, with emphasis on technological advances and current issues associated with site cleanup. In specific, the forum covered MGP coal-tar delineation, soil and groundwater remediation technologies, improvements in air monitoring, and ecological risk characterization/risk management tools.

  12. Proceedings: EPRI Second Phased Array Inspection Seminar

    SciTech Connect

    2001-11-01

    The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

  13. EPRI's coal combustion product use research

    SciTech Connect

    Ladwig, K.

    2008-07-01

    For more than 20 years, EPRI's Coal Combustion Product Use Program has been a leader in providing research to demonstrate the value of using coal combustion products (CCPs) in construction and manufacturing. Work is concentrated on large-volume uses, increasing use in traditional applications, uses in light of changes in CCP quality resulting form increased and new air emissions controls for nitrogen oxides, sulfur oxides and mercury. Currently, EPRI is investigating opportunities for using higher volumes of Class C ash in concrete; approaches for ensuring that mercury controls do not adversely affect the use of CCPs; agricultural uses for products from flue gas desulfurization; possible markets for spray dryer absorber byproducts; and issues involved with the presence of ammonia in ash. Some recent results and future work is described in this article. 4 photos.

  14. Proceedings: 2003 EPRI Workshop on Condensate Polishing

    SciTech Connect

    2004-02-01

    Successful condensate polishing operations maintain control of ionic and particulate impurity transport to the pressurized water reactor (PWR) steam generator and the boiling water reactor (BWR) reactor and recirculation system, thus allowing the units to operate more reliably. This report contains the work presented at EPRI's 2003 Workshop on Condensate Polishing, where 30 papers were presented on current issues, research, and utility experiences involving polishing issues at both PWR and BWR units.

  15. EPRI Nuclear Power Group`s Instrumentation and Control Program

    SciTech Connect

    Machiels, A.J.

    1995-03-01

    EPRI`s Nuclear Power Group`s Instrumentation and Control Program is outlined. The topics discussed include an introduction, I and C obsolescence cost control initiative, and EPRI as a strategic partner. The cost control initiative included a multiyear effort to assist utilities in planning, implementing, and licensing digital instrumentation and control upgrades in nuclear power plants; the approach is intended to be pragmatic and flexible; and active utility participation is anticipated through tailored-collaboration-funded plant demonstrations.

  16. Proceedings of the Third EPRI Phased Array Ultrasound Seminar

    SciTech Connect

    2003-12-01

    Phased array technology for ultrasonic examination is providing innovative solutions for nuclear in-service examination applications. EPRI has been a prime mover in the development and deployment of phased array ultrasound applications in the domestic nuclear market over the past decade. As part of this strategic effort, EPRI has hosted a series of seminars on phased array technology and its applications.

  17. Proceedings: EPRI Cancer Workshop II on laboratory research

    SciTech Connect

    Kavet, R.

    1993-09-01

    A workshop on Electric and Magnetic Fields (EMF) and Cancer was held in Washington, DC, on September 6, 1991, organized by the Electric Power Research Institute (EPRI) EMF Health Studies Program. The primary objective of the EPRI Cancer Research Workshop II was to review the status and future of the Institute`s laboratory research program on EMF and cancer; program direction had been determined based on recommendations from EPRI`s first cancer workshop in July 1988. Research that addressed these recommendations in the intervening three years, either within the EPRI program or in other programs around the world, was reviewed. To identify laboratory research that would be responsive to current needs, workshop participants discussed four experimental systems, key results, and areas for further research. These systems include the mouse skin tumor model, use of C3H/l0T1/2 cells and their derivatives, the nude mouse model, and pineal research. In the final phase of the workshop participants developed recommendations for future research that could help resolve what role, if any, EMF exposure plays in carcinogenesis. EPRI`s EMF Health Studies Program is considering these recommendations within the process of evaluating existing projects and developing new laboratory research.

  18. Electric Power Research Institute (EPRI) 2006 annual report

    SciTech Connect

    2007-07-01

    The annual report reviews EPRI's leadership role in four of the major technical areas related to preparing the industry for a carbon-constrained future: improving the efficiency of electricity end use, fulfilling the promise of renewable and distributed energy resources, supporting expansion of nuclear energy, and reducing CO{sub 2} emissions from coal-fired power plants. Particular attention is given to accomplishments during 2006 and how these fit into EPRI's research strategy for addressing the industry's technological needs. The report outlines EPRI's governance, includes it financial report up to 31 December 2006, and lists its members.

  19. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    SciTech Connect

    J. H. Jackson; S. P. Teysseyre

    2012-10-01

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  20. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    SciTech Connect

    J. H. Jackson; S. P. Teysseyre

    2012-02-01

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  1. DOE/EPRI hybrid power system

    SciTech Connect

    Stiger, S.G.; Taylor, K.J.; Hughes, E.E.

    1988-01-01

    One of the primary objectives of the DOE Geopressured Geothermal Program is to improve methods for optimum energy extraction from geopressured reservoirs. Hybrid power systems which take advantage of the chemical and thermal energy content of geopressured fluids could improve conversion efficiency by 15 to 20% over the same amount of fuel and geothermal fluid processed separately. In a joint DOE/EPRI effort, equipment from the Direct Contact heat Exchange test facility at East Mesa is being modified for use in a unique geopressured hybrid power plant located at the Pleasant Bayou wellsite in Brazoria County, TX. Natural gas separated at the wellhead will fuel a gas turbine, and exhaust heat from the engine will be used with the geothermal brine to vaporize isobutane in a binary power cycle. The hybrid power system is designed for 10,000 bbl/day brine flow, with estimated power production of 980 kW (net). In addition to evaluating the enhanced performance resulting from the combined power generation cycles, operation of the hybrid unit will provide a demonstration of fuel flexibility in an individual plant. This approach would allow a resource developer to reduce costs and risks by optimizing production for various economic climates and would improve the mix in a utility's generating system. 5 refs., 2 figs.

  2. Mercury emission control technologies: An EPRI synopsis

    SciTech Connect

    Change, R.; Offen, G.R.

    1995-11-01

    The air toxics provisions under Title III of the 1990 Clean Air Act Amendments (CAAA) require the US Environmental Protection Agency (EPA) to conduct a study that focuses on electric utility emissions. Due to be completed by the end of 1995, this study is being conducted to determine whether the release of toxic materials, including mercury, present an unacceptable risk to public health. Of the 189 substances designated hazardous air pollutants (commonly called air toxics), mercury was also singled out for a separate report because of concerns that humans could be harmed by the consumption of fish that have accumulated methylmercury from their food sources. The Electric Power Research Institute (EPRI), the research and development arm of its member electric utilities, is conducting research on mercury in four areas: (1) determining the extent of mercury emissions from electric utility power plants, (2) understanding health effects, (3) modeling mercury dispersion transport, deposition and bioaccumulation, and (4) assessing mercury control strategies. While the focus of this paper is on the last area, a precis of the results obtained to date in the other three areas is presented first.

  3. Status of EPRI's waterside corrosion activities

    SciTech Connect

    Chexal, V.K.; Torok, R.C. ); Shevde, V.C.; Randall, G.A. ); Horowitz, J.S. )

    1990-01-01

    The Electric Power Research Institute (EPRI) has instituted a program in the area of waterside corrosion. This program is designed to develop methodologies to: identify the specific corrosion problem, and then analyze the situation to help utility personnel develop a cost- effective inspection and remedial action program. To do this, there is an overview program - CHEXPERT - which identifies the types of corrosion which are likely to occur in a given situation. CHEXPERT is an expert system providing advisory and diagnostic services in this area. A number of analytical modules under CHEXPERT have been and are continuing to be developed. These modules are designed to enable utility personnel to perform the quantitative evaluations necessary in order to develop an optimum inspection program. CHEC, CHECMATE, and CHEC-CAV are inspection planning tools for single phase erosion corrosion, two-phase erosion, and cavitation, respectively. CHEC-NDE and CHEC-THK facilitate management of inspection data and assessment of worn component adequacy. CHEC and CHECMATE are currently complete and in wide use; the other modules are at various stages of development. The status, technical basis and use of all the analytical models are presented.

  4. DOE-EPRI On-Line Monitoring Implementation Guidelines

    SciTech Connect

    E. Davis, R. Bickford

    2003-01-02

    Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasability of on-line monitoring at several participating nuclear plants. The results have been very enouraging, and substantial progress is anticipated in the coming years.

  5. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    SciTech Connect

    McGowin, C.; DeMeo, E.; Calvert, S.

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  6. Advanced combustion turbines and cycles: An EPRI perspective

    SciTech Connect

    Touchton, G.; Cohn, A.

    1995-10-01

    EPRI conducts a broad program of research in combustion turbine technology on behalf of its funders which is directed toward improving their competitive positions through lower cost of generation and risk mitigation. The major areas of EPRI interest are: (1) Combustion Turbine Technology Development, Assessment, and Procurement Information and Products. (2) Risk mitigation of emerging combustion turbines through durability surveillance. (3) Existing Fleet Management and Improvement Technology. In the context of the DOE ATS Review, the present paper will address new advanced turbines and cycles and durability surveillance, of emerging combustion turbines. It will touch on existing fleet management and improvement technology as appropriate.

  7. Proceedings: EPRI urban rail issues workshop. Final report

    SciTech Connect

    Bernard, M.J. III

    1993-12-01

    The purpose of this workshop was to discuss rail issues relevant to utility managers interested in public transportation. This workshop provided EPRI and its member utilities with ideas and information for developing a research agenda for urban rail systems. The information provided herein should better prepare utilities to make decisions related to the development of urban rail systems in their service areas.

  8. EPRI`s nuclear power plant instrumentation and control program and its applicability to advanced reactors

    SciTech Connect

    Naser, J.; Torok, R.; Wilkinson, D.

    1997-12-01

    I&C systems in nuclear power plants need to be upgraded over the lifetime of the plant in a reliable and cost-effective manner to replace obsolete equipment, to reduce O&M costs, to improve plant performance, and to maintain safety. This applies to operating plants now and will apply to advanced reactors in the future. The major drivers for the replacement of the safety, control, and information systems in nuclear power plants are the obsolescence of the existing hardware and the need for more cost-effective power production. Competition between power producers is dictating more cost-effective power production. The increasing O&M costs to maintain systems experiencing obsolescence problems is counter to the needs for more cost-effective power production and improved competitiveness. This need for increased productivity applies to government facilities as well as commercial plants. Increasing competition will continue to be a major factor in the operation of both operating plants and advanced reactors. It will continue to dictate the need for improved productivity and cost-effectiveness. EPRI and its member nuclear utilities are working together on an industry wide I&C Program to address I&C issues and to develop cost-effective solutions. A majority of the I&C products and demonstrations being developed under this program will benefit advanced reactors in both the design and operational phases of their life cycle as well as it will benefit existing plants. 20 refs.

  9. Assessing coal combustion and sourcing strategies using EPRI`s CQIM{sup {trademark}}

    SciTech Connect

    Stallard, G.S.; Jennison, K.D.

    1995-12-01

    Understanding the cost and performance issues associated with coal quality or, more precisely, specific constituents within coal is an important ingredient of engineering and planning processes. Such processes can cover a wide range of activities, including how to most cost-effectively burn local coal supplies, how to identify what technologies or designs should be employed for new facilities, and how to identify potentially viable {open_quotes}new{close_quotes} coal supplies. Selection of coals, coal blends, or coal benefication processes is a complex problem. Similarly, it is difficult for industry participants (ministries, regulators, distribution companies, etc.) To correlate fuel selection strategies to overall power system performance costs. The underlying need to understand coal quality impacts on the financial efficiency of a plant is increasingly important in light of economic and environmental pressures faced by today`s power industry. The Coal Quality Impact Model (CQIM{reg_sign}) offers an ideal platform for understanding and evaluating coal quality impacts. Developed by Black & Veatch for the electric Power Research Institute (EPRI), CQIM is a computer {open_quotes}tool{close_quotes} that is dedicated to maintaining state-of-the-art status by continually incorporating the latest technologies or modeling techniques as they become available. By taking advantage of research efforts and a sound engineering modeling approach, the CQIM is capable of predicting plant-wide performance impacts and translating them into costs.

  10. Utility researchers plan future - with our money: EPRI's drive for centralized power, synfuels, and more nukes

    SciTech Connect

    Peters, A.

    1981-06-01

    Research efforts by the Electric Power Research Institute (EPRI) focus on synfuels, coal, and nuclear energy at the expense of renewable energy sources and regulations to protect safety and the environment. EPRI is accused of pursuing industry profits, downgrading regulations, and centralized power. Evidence for these accusations is drawn from the EPRI budget, memos, and EPRI studies on nuclear projects, renewables, fuel cells, and battery technology. Funds have been diverted to alternative research programs in two states, but EPRI commands about $2.60 per year from each utility customer for its $260 million (1980) budget, which funds the industry's major research effort. (DCK)

  11. Electric Power Research Institute (EPRI) 2005 annual report

    SciTech Connect

    2006-07-01

    The Electric Power Research Institute, with major locations in Palo Alto, California and Charlotte, North Carolina, is an independent, non-profit center for public interest energy and environmental research. The annual report highlights progress during 2005. Projects reported include: plug-in hybrid electric vehicle, intelligent universal transformer; air pollution toxicology research; and Ohio River ecological research. EPRI's Coal Fleet for Tomorrow initiative is described. This has provided the US Congress with an analysis of proposed financial incentives for the Energy Policy Act of 2005 and by developing plant design guidelines for integrated gasification combined cycle power plants. In 2006 the work will be extended to examine combustion systems designed for near-zero emissions. The report outlines EPRI's governance, includes its financial report up to 31 December 2005, and lists its members.

  12. Operation of the EPRI Nondestructive Evaluation Center. 1983 annual report

    SciTech Connect

    Nemzek, T.A.; Stone, R.M.; Schoenecke, P.L.; Ammirato, F.V.; Becker, F.L.; Behravesh, M.; Brown, S.D.; Pherigo, G.L.; Wilson, G.H. III

    1984-07-01

    This report describes the Electric Power Research Institute (EPRI) funded nondestructive evaluation (NDE) project activities carried out by the J.A. Jones Applied Research Company. The primary support for this project is provided through Contract RP 1570-2 with supplementary funding provided by interested EPRI Owners' Groups. The purpose of the project is to design, construct, organize, staff, equip and operate a dedicated facility for providing improved and field qualified NDE equipment, procedures, and personnel training to the electric utility industry. The entire scope of this work is presented with major emphasis placed on the activities in 1983, the second full year of operation in the Nondestructive Evaluation Center facility. The NDE Center is providing a bridge to transfer useful research and development results to routine field application. This is being accomplished through qualification and refinement for field use of equipment and techniques developed in EPRI sponsored and other related projects, realistic training of utility designated personnel and organization of greater involvement of the academic community in NDE education. Significant assistance has been provided to the electric utility industry under this project in the form of improved, field ready NDE equipment and procedures; critically needed documentation on present inspection method capability; mechanisms for demonstrating the effectivenesss of techniques being used; rapid response assistance for critical, short-term problems; and training for generic industry needs.

  13. EPRI/NRC-RES fire human reliability analysis guidelines.

    SciTech Connect

    Lewis, Stuart R.; Cooper, Susan E.; Najafi, Bijan; Collins, Erin; Hannaman, Bill; Kohlhepp, Kaydee; Grobbelaar, Jan; Hill, Kendra; Hendrickson, Stacey M. Langfitt; Forester, John Alan; Julius, Jeff

    2010-03-01

    During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support current requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting

  14. EPRI training to support digital upgrades in nuclear plants

    SciTech Connect

    Torok, R.; Naser, J.

    2006-07-01

    In response to the growing challenges of obsolescence and rising maintenance costs, utilities are increasingly upgrading or replacing their existing instrumentation and control (I and C) systems and components. In most cases, this involves analog-to-digital or digital-to-newer-digital replacements. However, the use of digital technology often raises new technical and licensing issues, particularly for safety-related applications. Examples include: new failure modes and the potential for common-mode failure of redundant components; electromagnetic compatibility (EMC); potential human-system interface problems; and software verification, validation, and configuration management. Successful implementation, operation and maintenance of digital systems depend to a great extent on having processes in place that are tailored for digital technology. Nuclear plants are therefore updating their processes as they start the migration to digital I and C. For several years, EPRI has been developing guidelines to address the key technical issues and interfacing with the U.S. NRC to ensure the acceptability of the approaches developed. A framework for implementing digital upgrades now exists, but practical experience under the current regulatory environment is sparse. Significant uncertainty exists in regard to both technical and licensing issues. Many utilities still need to prepare their staff and processes to properly handle the new technology. In recent years, this need has been exacerbated by staff reductions, changing job assignments, and declining training budgets. EPRI has responded by developing a training program to help utilities efficiently bring design and licensing engineers up to speed on the latest issues and guidance affecting the implementation of digital upgrades in nuclear plants. This paper describes the key technical issues in the context of the EPRI training program. (authors)

  15. Proceedings of the Second EPRI Conference on Competition

    SciTech Connect

    1998-06-01

    These proceedings highlight the EPRI Conference on Competition in the Water and Wastewater Industries, held October 20-21, 1997, in San Francisco, CA. The 30 presentations represented a cross-section of domestic and international investor-owned and public water and wastewater professionals, as well as engineering, financial, legal, union and regulatory experts, providing a broad scope on the role of competition in these industries. As these speakers presented their perspectives, attendees gained a better understanding of the complex issues, opportunities, risks, and most promising areas for private investment and public/private partnerships in the water and wastewater industries.

  16. Controlling your technical destiny. EPRI's chief executive looks to the future

    SciTech Connect

    Balzhiser, R.E.

    1994-03-15

    This article describes EPRI's research efforts that are designed to help utilities use the results of research, to keep them informed of emerging trends, and to provide them with technologies that allow the flexibility to respond to the market place. Changes in the organization of EPRI to make them more responsive to members' needs are also described.

  17. Recent advances in the EPRI high-concentration photovoltaic program

    SciTech Connect

    McNaughton, W.P.; Richman, R.H.

    1992-02-01

    By the early 1980s, Stanford University under contract with the Electric Power Research Institute (EPRI) produced a point-contact photovoltaic cell that has established a number of world record achievements. In 1984 a conceptual design was proposed for a cell package, module, and array system for use in utility-scale commercial power production. Since 1984, EPRI has moved the laboratory concept forward toward commercial application. More than 1500 high concentration cells have been produced in the evolutionary process. Approximately 700 of those cells have been or are presently being installed in fully operational modules for field tests. Over 130 modules have been constructed and are in field testing for electrical, thermal or weathering tests. Two full-sized array structures (each containing 60 instrumented thermal'' modules) have been constructed and continue to undergo field testing for alignment, performance, and reliability. This two volume report reviews the key challenges that have confronted the development of a commercial system and describes the program response to those challenges. The intent is to inform interested readers -- utilities, commercializers, researchers -- as to the primary developments and test results that have been achieved. A considerable body of raw data'' has been included so that interested researchers can draw their own conclusions without needing to refer to the source documents. Volume 1 discusses design fabrication and performance of the cell; design, construction and testing of the cell package and the design, fabrication and testing of the optical system. Volume 2 reviews the module and array programs, discusses other system issues and presents a short review of the technology's open issues.

  18. SCR and hybrid systems for utility boilers: A review of current EPRI-sponsored results

    SciTech Connect

    Zammit, K.D.

    1995-12-31

    The Electric Power Research Institute has sponsored extensive research in the area of Selective Non-Catalytic Reduction (SNCR) and Selective Catalytic Reduction (SCR) to help its members meet the NO{sub x} compliance provisions of the Clean Air Act Amendments. As part of that program, EPRI has sponsored a series of SCR pilot demonstration to evaluate the performance and life expectancy of SCR catalysts on utility boilers and U.S. fuels. This paper will summarize the results of these pilots. In addition, EPRI has been helping members develop hybrid systems, which combine SNCR, In-Duct Catalyst (IDC), and Air Preheater Catalyst (APHC). EPRI has established a methodology to determine when a hybrid system would be the optimum approach to meet NO{sub x} compliance goals.

  19. Proceedings: 2000 EPRI Workshop on PWSCC of Alloy 600 in PWRs (PWRMRP-27)

    SciTech Connect

    2000-11-01

    Primary water stress corrosion cracking (PWSCC) can lead to increased costs for operation, maintenance, assessment, repair, and replacement of PWR components. This EPRI workshop emphasized issues related to PWSCC of reactor vessel (RV) closure head nozzles, including control rod drive mechanism (CRDM) nozzles, and other primary system alloy 600 penetrations.

  20. CONTROL TECHNOLOGY: SUMMARY OF THE 1991 EPRI/EPA/DOE S02 CONTROL SYMPOSIUM

    EPA Science Inventory

    The 1991 SO2 Control Symposium was held December 3–6, 1991, in Washington, D.C. The symposium, jointly sponsored by the Electric Power Research Institute (EPRI), the U.S. Environmental Protection Agency (EPA), and the U.S. Department of Energy (DOE), focused attention...

  1. Technical support for the hydrogen control requirement for the EPRI advanced light water reactor requirements document

    SciTech Connect

    Plys, M.G.

    1988-01-01

    Hydrogen could be a significant contributor to severe-accident risk if hydrogen generation and combustion were to lead to containment failure and resulting release of fission products. To eliminate hydrogen as a significant risk contributor for advanced light water reactors (ALWRs), the Electric Power Research Institute (EPRI) ALWR requirements document has imposed a hydrogen control requirement. This requirement specifies an upper limit of 13 dry vol% for the allowable hydrogen concentration in containment. The requirement also considers hydrogen generation during severe accidents and states an upper bound on the hydrogen source equivalent to that generated by oxidizing 75% of the active cladding (commonly stated as 75% metal/water reaction (MWR)). The purpose of this paper is to technically support and substantiate the EPRI ALWR hydrogen requirement. The current understanding of hydrogen generation and combustion is evaluated as it applies to reactor systems, and it is concluded that both experimental results and analytical methods provide a sound technical basis for the requirement.

  2. Light Water Reactor Sustainability Program FY13 Status Update for EPRI - RISMC Collaboration

    SciTech Connect

    Curtis Smith

    2013-09-01

    The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development (R&D) is to support plant decisions for risk-informed margins management with the aim to improve economics, reliability, and sustain safety of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced "RISMC toolkit" that enables more accurate representation of NPP safety margin. In order to carry out the R&D needed for the Pathway, the Idaho National Laboratory (INL) is collaborating with the Electric Power Research Institute (EPRI) in order to focus on applications of interest to the U.S. nuclear power industry. This report documents the collaboration activities performed between INL and EPRI during FY2013.

  3. Assessment of the prevailing physics codes: LEOPARD, LASER, and EPRI-CELL

    SciTech Connect

    Lan, J.S.

    1981-01-01

    In order to analyze core performance and fuel management, it is necessary to verify reactor physics codes in great detail. This kind of work not only serves the purpose of understanding and controlling the characteristics of each code, but also ensures the reliability as codes continually change due to constant modifications and machine transfers. This paper will present the results of a comprehensive verification of three code packages - LEOPARD, LASER, and EPRI-CELL.

  4. EPRI/NRC-RES fire PRA guide for nuclear power facilities. Volume 1, summary and overview.

    SciTech Connect

    Not Available

    2004-09-01

    This report documents state-of-the-art methods, tools, and data for the conduct of a fire Probabilistic Risk Assessment (PRA) for a commercial nuclear power plant (NPP) application. The methods have been developed under the Fire Risk Re-quantification Study. This study was conducted as a joint activity between EPRI and the U. S. NRC Office of Nuclear Regulatory Research (RES) under the terms of an EPRI/RES Memorandum of Understanding [RS.1] and an accompanying Fire Research Addendum [RS.2]. Industry participants supported demonstration analyses and provided peer review of this methodology. The documented methods are intended to support future applications of Fire PRA, including risk-informed regulatory applications. The documented method reflects state-of-the-art fire risk analysis approaches. The primary objective of the Fire Risk Study was to consolidate recent research and development activities into a single state-of-the-art fire PRA analysis methodology. Methodological issues raised in past fire risk analyses, including the Individual Plant Examination of External Events (IPEEE) fire analyses, have been addressed to the extent allowed by the current state-of-the-art and the overall project scope. Methodological debates were resolved through a consensus process between experts representing both EPRI and RES. The consensus process included a provision whereby each major party (EPRI and RES) could maintain differing technical positions if consensus could not be reached. No cases were encountered where this provision was invoked. While the primary objective of the project was to consolidate existing state-of-the-art methods, in many areas, the newly documented methods represent a significant advancement over previously documented methods. In several areas, this project has, in fact, developed new methods and approaches. Such advances typically relate to areas of past methodological debate.

  5. Gas dynamics/furnace implosion problems validation and application of the EPRI program DUCSYS

    SciTech Connect

    Forrest, T.J.; Green, C.H.; Rea, J.

    1995-06-01

    Considerable Utility concern about power plant boiler implosion risks has recently resurfaced. This results largely from the current trend towards retrofitting environmental equipment to fossil fuel fired boilers, an action which is often accompanied by an increase in the risk faced, under fault conditions, from large negative pressure excursions in the furnace and its associated ductwork. Accompanying this trend has been a tightening of industry regulations with the publishing of new stricter guidelines on the prevention of furnace implosions and explosions by the National Fire Protection Association. The combined effect has been the need to assess boiler implosion risks as an integral part of fossil fuel fired boiler retro-fit design studies. The DUCSYS gas systems dynamics modelling system, which is currently being developed under contract by PowerGen, is EPRI`s response to this Utility demand. This paper describes briefly the physical processes involved in the implosion phenomenon, and discusses the main characteristics of the DUCSYS modeling system. Following this, the application of DUCSYS to study three power plant problems is discussed. The main study discusses the conversion of an existing Oil fired boiler to burn Orimulsion, a technology in which PowerGen leads the World. This application involves the retro-fitting of an electrostatic precipitator to the plant. DUCSYS is not however, purely a system for investigation of furnace implosion risks, but is currently being developed by PowerGen, on behalf of EPRI, as a general power plant has systems dynamics modeling system. The final two application studies consider the application of DUCSYS to two more general gas dynamics problems.

  6. A summary of recent advances in the EPRI high-concentration photovoltaic program

    SciTech Connect

    McNaughton, W.P.; Richman, R.H. )

    1992-03-01

    During the 1970s and early 1980s a promising solar cell technology evolved in the laboratory at Stanford University under contract with the Electric Power Research Institute (EPRI). The work produced a point-contact photovoltaic cell that has established a number of world record achievements. In 1984 a conceptual design was proposed for a cell package, module, and array system for use in utility-scale commercial power production. Since 1984, EPRI has moved the laboratory concept forward toward commercial application. The design and processing of the cell has progressed from laboratory device research toward a mass-produced commodity, with concurrent reduction in cost and improvement in uniformity. A number of inadequacies have been confronted and eliminated. A progressive design philosophy for the production of cell packages, modules and arrays has been invoked and executed. An extensive test program to determine module and array performance and reliability has been put in place. More than 1500 high concentration cells have been produced in the evolutionary process. Approximately 700 of those cells have been or are presently being installed in fully operational modules for field tests. Over 130 modules have been constructed and are in field testing for electrical, thermal or weathering tests. Two-full sized array structures (each containing 60 instrumented thermal'' modules) have been constructed and continue to undergo field testing for alignment, performance, and reliability. The purpose of this summary document is to provide an overview of the activities that have occurred since the issue of the early conceptual design study. This summary has a companion two-volume report, Recent Advances in The EPRI High-Concentration Photovoltaic Program (1), that provides considerable detail about the advances that are summarized in this volume.

  7. A summary of recent advances in the EPRI high-concentration photovoltaic program

    SciTech Connect

    McNaughton, W.P.; Richman, R.H.

    1992-03-01

    During the 1970s and early 1980s a promising solar cell technology evolved in the laboratory at Stanford University under contract with the Electric Power Research Institute (EPRI). The work produced a point-contact photovoltaic cell that has established a number of world record achievements. In 1984 a conceptual design was proposed for a cell package, module, and array system for use in utility-scale commercial power production. Since 1984, EPRI has moved the laboratory concept forward toward commercial application. The design and processing of the cell has progressed from laboratory device research toward a mass-produced commodity, with concurrent reduction in cost and improvement in uniformity. A number of inadequacies have been confronted and eliminated. A progressive design philosophy for the production of cell packages, modules and arrays has been invoked and executed. An extensive test program to determine module and array performance and reliability has been put in place. More than 1500 high concentration cells have been produced in the evolutionary process. Approximately 700 of those cells have been or are presently being installed in fully operational modules for field tests. Over 130 modules have been constructed and are in field testing for electrical, thermal or weathering tests. Two-full sized array structures (each containing 60 instrumented ``thermal`` modules) have been constructed and continue to undergo field testing for alignment, performance, and reliability. The purpose of this summary document is to provide an overview of the activities that have occurred since the issue of the early conceptual design study. This summary has a companion two-volume report, Recent Advances in The EPRI High-Concentration Photovoltaic Program (1), that provides considerable detail about the advances that are summarized in this volume.

  8. Evaluation of solar radiation measurement systems: EPRI/NREL final test report. Volume 1

    SciTech Connect

    Stoffel, T; Riordan, C; Bigger, J

    1992-11-01

    Measured solar radiation resource data are needed by electric utilities to evaluate the potential of renewable energy options like photovoltaics in their service territory. In this final test report, we document a cooperative project of the Electric Power Research Institute (EPRI) and the National Renewable Energy Laboratory (NREL) to compare available measurement system options for performing solar radiation resource assessments. We present the detailed results of a 6-month field comparison of thermopile-based pyranometer and pyrheliometer solar irradiance measurement systems with two different implementations of the rotating shadowband radiometer (RSR) concept installed at NREL`s Solar Radiation Research Laboratory (SRRL) in Golden, Colorado.

  9. Power Performance Testing Progress in the DOE/EPRI Turbine Verification Program

    SciTech Connect

    Smith, B.; Randall, G.; McCoy, T; Vandenbosche, J.

    2001-07-18

    As part of the U.S. Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program (TVP), tests are conducted to characterize the power performance of individual wind turbines at each wind project. The testing is performed in a variety of terrain types, including mountains, plains, deserts, and coastal tundra; and under a wide range of atmospheric conditions, from arid to arctic. Initial results and experiences of the testing were reported the WindPower 2000 conference. This paper presents the status of the power performance testing and new results from the past year.

  10. Criteria for practical fusion power systems: Report from the EPRI fusion panel

    NASA Astrophysics Data System (ADS)

    Kaslow, J.; Brown, M.; Hirsch, R.; izzo, R.; McCann, J.; McCloud, D.; Muston, B.; Peterson, A.; Rosen, S.; Schneider, T.; Skrgic, P.; Snow, B.

    1994-09-01

    Electric utilities are keenly interested in the promise of fusion: large-scale electricity production anywhere, with virtually no natural resource depletion or environmental pollution. To expedite development of commercially viable fusion systems, the Electric Power Research Institute (EPRI)—the R&D wing of the U.S. electric utility industry—recently convened a panel of top utility R&D managers and executive officers to identify the key criteria that must be met by fusion plants in order to be acceptable to utilities. The panel's findings, summarized in this report, emphasize competitive economics, positive public perception, and regulatory simplicity.

  11. EPRI advanced light water reactor requirements document to establish standardization principles

    SciTech Connect

    Stahlkopf, K.E.; Noble, D.M.

    1986-01-01

    The essential element of the EPRI Advanced Light Water Reactor (ALWR) Program is its Utility Requirements Document. The requirements document consists of utility-authorized specifications for a future nuclear plant. The document will actually consist of 13 chapters. Each of these chapters will contain requirements for several plant systems so that all plant systems are addressed with requirements for a future LWR (either a BWR or a PWR). In addition, a chapter on plant arrangement and another on instrumentation and control cover overall aspects of plant design and construction requirements. The requirements document is intended to specify the features utilities consider essential for a future plant. An ALWR Utility Steering Committee has been established to provide for review and direction to the production of the utility requirements. The committee is formed by executives of EPRI member utilities with significant nuclear design, construction, operation, and maintenance experience. Completing the requirements document will involve obtaining favorable safety evaluation reports from the NRC on each chapter and the complete document. When completed, the ALWR Utility Requirements Document will be an NRC-endorsed expression of utility needs for future plants.

  12. EPRI program for improvement of I C systems with digital technology

    SciTech Connect

    Sun, B.; Naser, J.; Wilkinson, D.; Bhatt, S.; Reuland, W.; Wray, L.; Torok, R.; Lin, Ching-lu; Machiels, A. )

    1993-01-01

    Many nuclear power plants that have been operating since the 1970s are designed and manufactured based on technology from the 1960s. Because of obsolescence, lack of original equipment manufacturer support, challenges to availability due to unnecessary plant trips, component reliability due to aging, and high maintenance and testing costs, analog-based instrumentation and control (I C) equipment and systems are being replaced with digital systems in current nuclear power plants. Furthermore, the technology for I C hardware and software design and development are changing rapidly due to advancement in state-of-the-art technologies. Since 1990, the Electric Power Research Institute (EPRI), on behalf of its member utilities, has developed an Integrated I C Upgrade Plan and has research and development under way to help solve these I C obsolescence problems on a plantwide basis. There are various elements of the integrated I C plan. These technical elements are instrumentation, control and protection, communication, human-machine systems, verification and validation, maintenance, standards and specifications, and plant demonstrations. Goals of the EPRI integrated I C plan are (a) to develop methodologies applicable to each nuclear steam supply system type plant to implement an integrated I C upgrade plan, (b) to demonstrate the methodologies through utility application to at least ten key systems by the year 2000, and (c) to achieve enhanced safety, reduction in operating and maintenance costs, increased plant performance, and reduced vulnerability to I C obsolescence.

  13. Optimization of NO{sub x} emissions and heat rate using EPRI APECS tools ultramax and GNOCIS

    SciTech Connect

    Stallings, J.; Sorge, J.; Menzies, B.

    1996-05-01

    In response to the Clean Air Act Amendments of 1990, an approach to optimize the trade-offs between NO{sub x} and performance in fossil fuel boilers has been developed by EPRI. The Advisory Plant and Environmental Control System (APECS) provides tools to identify set points for optimal operation, to maintain optimal performance with enhancements to existing distributed control systems, and ultimately to minimize the cost of electricity. Results are presented for applications of two EPRI products: sequential process optimization using ULTRAMAX{reg_sign} and closed-loop supervisory control with GNOCIS.

  14. EPRI High-Sulfur Test Center: Wet flue gas desulfurization baseline limestone tests

    SciTech Connect

    Gray, S.M.; Burke, J.M.

    1990-10-01

    This report presents the results of the Baseline Limestone Test Program conducted at Electric Power Research Institute's (EPRI) High Sulfur Test Center (HSTC). The objective of this program was to characterize wet limestone FGD system performance as a function of basic FGD design and operating variables using the pilot system at the HSTC. The results from this program will be useful in optimizing existing wet limestone FGD systems, and will provide the foundation for more specific research to be conducted at the HSTC. The design and operating variables that were investigated include: inlet SO{sub 2} concentration, liquid-to-gas ratio, slurry pH and density, dissolved calcium concentration, reaction tank volume, limestone grind, and in-situ forced oxidation. Results illustrate the effect of these variables on SO{sub 2} removal efficiency, limestone utilization, sulfite oxidation, and the waste solids properties. 20 refs., 58 figs., 19 tabs.

  15. Proceedings: EPRI's Agricultural and Food Technology Alliances: Memphis, Tennessee, May 12-14, 1998

    SciTech Connect

    1998-05-01

    This document is a compilation of field trip overviews, presentations and committee reports from the EPRI Agricultural Technology Alliance (ATA) and Food Technology Alliance (FTA) Joint Meeting held in Memphis, Tennessee, May 12-14, 1998. Presentation titles include: Agricultural Research Programs in Tennessee; Tennessee's Food and Agricultural Research Programs; The TVA -- Formation and Evolution, Deregulation/Restructuring the Electric Utility Industry -- Status and Update; Water and Wastewater Program Interactions with the Food and Agricultural Technology Alliances; Aquaculture -- Its Importance to Food and Agriculture; The Poultry Industry -- The Original Agriculture and Food Integrator; Update on Electronic Pasteurization; and California's Electric Industry Restructuring New Options for Agricultural Customers. The document also includes steering committee actions of both the ATA and the FTA, a registration list, steering committee operating procedures and member services for the ATA and the FTA, project summaries, and minutes from the ozone workshop that took place prior to the meeting.

  16. Benchmarking of epithermal methods in the lattice-physics code EPRI-CELL

    NASA Astrophysics Data System (ADS)

    Williams, M. L.; Wright, R. Q.; Barhen, J.; Rothenstein, W.; Toney, B.

    The epithermal cross section shielding methods used in the lattice physics code EPRI-CELL (E-C) were extensively studied to determine its major approximations and to examine the sensitivity of computed results to these approximations. Several improvements in the original methodology resulted. These include: treatment of the external moderator source with intermediate resonance (IR) theory, development of a new Dancoff factor expression to account for clad interactions, development of a new method for treating resonance interference, and application of a generalized least squares methods to compute best estimate values for the Bell factor and group dependent IR parameters. The modified E-C code with its new ENDF/B-V cross section library is tested for several numerical benchmark problems.

  17. Mercury emissions control by wet FGD systems: EPRI pilot-scale results

    SciTech Connect

    Peterson, J.R.; Hargrove, O.W. Jr.; Seeger, D.M.

    1995-06-01

    This paper presents results from pilot-scale tests that investigated mercury removal across wet limestone flue gas desulfurization (FGD) systems. The program was conducted at EPRIs Environmental Control Technology Center, located in Barker, NY. The test results showed that mercuric chloride (HgCl{sub 2}) was efficiently removed across the FGD system, while elemental mercury was not collected. The practical implication of this study is that although FGD systems efficiently remove some forms of mercury from flue gas, the overall mercury removal efficiency, and therefore the total mercury emissions from a coal-fired power plant equipped with an FGD system, will depend on the chemical form of the mercury in the flue gas. Unfortunately, no validated gas sampling method is available for speciating the different forms of mercury in flue gas. It is, therefore, difficult to predict mercury removal across FGD systems and to interpret any mercury removal data that have been collected.

  18. EPRI EMF exposure database: EMDEX occupational study data set. Final report

    SciTech Connect

    Senior, R.S.; Bracken, T.D.; Rankin, R.F.

    1996-10-01

    This document describes the EMDEX Occupational Study (EOS) Data Set containing the measurement data collected during the EPRI-sponsored study, Electric and Magnetic Field Measurement Study for Utilities - The EMDEX Project (RP2966-01). The data were supplied to the EPRI EMF Exposure Database by the original researchers at T. Dan Bracken, Inc. Electric and magnetic field exposure data were collected by volunteer employees at 55 utility sites. Volunteers were placed in one of sixteen job classifications depending on their job title and work environment. They maintained a simple logbook while wearing an EMDEX meter, allowing the measurement data to be identified with one of eight work environments or one of three non-work environments. The fourteen data products in the EMDEX Occupational Study Data Set contain the electric and magnetic field personal exposure measurements collected during the study and summaries of those measurements along with associated descriptive information. The exposure measurement data products consist of time-series and summary files. The former are the binary and ASCII time-series files of individual field measurements that contain both electric and magnetic field data. These time-series files represent over 28,800,000 individual field measurements. Separate summary files for electric and magnetic field measurements represent six levels of aggregation of the data. The documentation contains a project synopsis, full descriptions of all data elements, and the format and size of each data product. The final report for the project and other references are cited as sources of detailed information about study design, protocols, and results.

  19. A review of computer-aided body surface area determination: SAGE II and EPRI's 3D Burn Vision.

    PubMed

    Neuwalder, J M; Sampson, C; Breuing, K H; Orgill, D P

    2002-01-01

    Estimates of percent body surface area (%BSA) burns correlate well with fluid needs, nutritional requirements, and prognosis. Most burn centers rely on the Lund Browder chart and "rule of nines," to calculate the %BSA. Computer-based methods may improve precision and data analysis. We studied two new methods of determining %BSA: a two-dimensional Web-based program (Sage II) and a three-dimensional computer-aided design program (EPRI 3D Burn Vision). Members of our burn team found the Sage II program easy to use and found many of the features useful for patient care. The EPRI program has the advantage of 3D images and different body morphologies but required training to use. Computer-aided methods offer the potential for improved precision and data analysis of %BSA measurements.

  20. EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines: Technical Papers

    SciTech Connect

    None, None

    2011-12-01

    The EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines was a component of a larger project. The goal of the overall project was to conduct the final developmental engineering required to advance the commercialization of the Alden turbine. As part of this effort, the conference provided a venue to disseminate information on the status of the Alden turbine technology as well as the status of other advanced turbines and research on environmentally-friendly hydropower turbines. The conference was also a product of a federal Memorandum of Understanding among DOE, USBR, and USACE to share technical information on hydropower. The conference was held in Washington, DC on May 19 and 20, 2011 and welcomed over 100 attendees. The Conference Organizing Committee included the federal agencies with a vested interest in hydropower in the U.S. The Committee collaboratively assembled this conference, including topics from each facet of the environmentally-friendly conventional hydropower research community. The conference was successful in illustrating the readiness of environmentally-enhanced hydropower technologies. Furthermore, the topics presented illustrated the need for additional deployment and field testing of these technologies in an effort to promote the growth of environmentally sustainable hydropower in the U.S. and around the world.

  1. Proceedings: Fifth EPRI Balance-of-Plant Heat Exchanger NDE Symposium

    SciTech Connect

    1998-10-01

    This publication is a compilation of the agenda and material presented at the Fifth EPRI Steam Balance-of-Plant Heat Exchanger NDE Symposium which was held on June 15-17, 1997 at Lake Tahoe, Nevada. Along with the proceedings of the symposium, an attendance list is included in this document. The topics that are presented in the symposium are included in this publication in a Plenary Session and Sessions 1, 2, 3 and 4. An overview of the American Society for Nondestructive Testing (ASNT) Central Certification Program is presented in the Plenary Session. The following is a sampling of titles presented in the other sessions: An Engineer's Guide to Eddy Current Testing; ID Pit Sizing in a Carbon Steel Tubed Fuel Oil Storage Transfer Heater; Pilgrim Feedwater Heater Tube Repair; Through the Tube Plugging Application for Once Through Heat Exchangers; PFEC Inspection Method for Detection and Sizing of Uniform Wall Thinning; Some Characteristics of Pulsed Eddy Current Technique in Ferromagnetic Heat Exchanger Tubing; Utility Perspective on PC Based Database Management and Analysis Software; and NDE Demonstration and Inspection of Ginna Power Plant Moisture Separator Finned Tubing.

  2. CRA/EPRI coal market analysis system: integration and other improvements. Final report

    SciTech Connect

    Press, J.

    1981-12-01

    Current models of the coal market assume demand to be exogenous and, effectively, unresponsive to price. At the same time models of electric utility capacity expansion assume the prices of fuels to be exogenous. In fact the coal market and utility planning are interdependent. Integration of a coal model with a utility capacity planning model would allow investigation of the simultaneous operation of the two areas of activity. Modifications to the CRA/EPRI Coal Market Analysis System (CMAS) to enable such integration with the Gordian Utility Capacity Expansion Model have been designed and partially implemented. Some modifications were required to accomplish the interface and some to keep the CMAS to a reasonable size for computer implementation. In addition, other improvements were made to the CMAS apart from the requirements of integration. The theory and mechanics of integration using linear programming decomposition techniques have been developed with special application to the CMAS. Several alternative methods are discussed with one chosen for this particular investigation.

  3. The use of the EPRI program DUCSYS to assess boiler implosion hazards associated with FGD retro-fit applications

    SciTech Connect

    Forrest, T.J.; Adams, R.G.; Thame, P.N.

    1995-06-01

    Considerable Utility concern about power plant boiler implosion risks has recently resurfaced. This results largely from the current trend towards retrofitting environmental equipment such as FGD to fossil fuel fired boilers, an action which is often accompanied by an increase in the risk faced, under hult conditions, from large negative pressure excursions in the furnace and its associated ductwork. Accompanying this trend has been a tightening of industry regulations with the publishing of new stricter guidelines on the prevention of furnace implosions and explosions by the National Fire Protection Association. The combined effect has been the need to assess boiler implosion risks as an integral part of fossil fuel fired boiler retro-fit design studies. The DUCSYS gas systems dynamics modelling system, which is currently being developed under contract by PowerGen, is EPRI`s response to this Utility demand. This paper describes briefly the physical processes involved in the implosion phenomenon, and discusses the main characteristics of the DUCSYS modelling system. Following this, an application of DUCSYS to study the implosion risks associated with retrofitting an existing coal fired boiler with a wet limestone FGD process is described. DUCSYS is not however, purely a system for investigating furnace implosion risks, but is currently being developed by PowerGen, on behalf of EPRI as a general power plant gas systems dynamics modelling system.

  4. Agreement among 2 x 2 Agreement Indices.

    ERIC Educational Resources Information Center

    Conger, Anthony J.; Ward, David G.

    1984-01-01

    Sixteen measures of reliability for two-category nominal scales are compared. Upon correcting for chance agreement, there are only five distinct indices: Fleiss's modification of A-sub-1, the phi coefficient, Cohen's kappa, and two intraclass coefficients. Recommendations for choosing an agreement index are made based on definitions, magnitude,…

  5. Configuring the EPRI plant monitoring workstation for boiler section cleanliness at Texas Utilities`s Martin Lake Plant

    SciTech Connect

    Cona, C.; Ulvog, P.

    1995-06-01

    T.U. Electric`s Martin Lake plant has a history of boiler slagging which is characteristic of the Texas lignite used as fuel. Using the capabilities of EPRI`s Plant Monitoring Workstation (PMW) and enhanced performance monitoring instrumentation, Martin Lake has developed an on-line boiler cleanliness model that can be used to manage sootblowing. Testing of the model has been very positive, showing good correlation between blowers operated and cleanliness obtained. potential applications of this model are for (1) testing the effectiveness of revised combustion strategies and (2) development of an automatic sootblowing system. These two areas could result in heat rate improvements. This paper discusses how the PMW models were configured to represent Martin Lake`s boilers and the results of on-line tests. Critical to this technique is the calculation of boiler gas flow. A somewhat unique feature of Martin Lake`s model is the calculation of boiler gas flow based on the induction draft (ID) fan horsepower. Most boiler gas flow calculations are based on stack gas flow which would have been inaccurate because of the wet scrubbers and stack gas reheat on this unit. Using the ID fan horsepower to derive boiler gas flow has application in boiler efficiency calculations as well.

  6. Residential sector end-use forecasting with EPRI-Reeps 2.1: Summary input assumptions and results

    SciTech Connect

    Koomey, J.G.; Brown, R.E.; Richey, R.

    1995-12-01

    This paper describes current and projected future energy use by end-use and fuel for the U.S. residential sector, and assesses which end-uses are growing most rapidly over time. The inputs to this forecast are based on a multi-year data compilation effort funded by the U.S. Department of Energy. We use the Electric Power Research Institute`s (EPRI`s) REEPS model, as reconfigured to reflect the latest end-use technology data. Residential primary energy use is expected to grow 0.3% per year between 1995 and 2010, while electricity demand is projected to grow at about 0.7% per year over this period. The number of households is expected to grow at about 0.8% per year, which implies that the overall primary energy intensity per household of the residential sector is declining, and the electricity intensity per household is remaining roughly constant over the forecast period. These relatively low growth rates are dependent on the assumed growth rate for miscellaneous electricity, which is the single largest contributor to demand growth in many recent forecasts.

  7. An assessment of the impact of the 2003 EPRI ground-motion prediction models on the USGS national seismic-hazard maps

    USGS Publications Warehouse

    Cramer, C.

    2006-01-01

    Ground-motion attenuation relations have an important impact on seismic hazard analyses. Ground-motion modeling is particularly sensitive to assumptions about wave-propagation attenuation (crustal Q and geometrical spreading), as well as source and site conditions. Studies of path attenuation from earthquakes in eastern North America (ENA) provide insights into the appropriateness of specific attenuation relations. An Electric Power Research Institute (EPRI) (2003, 2004) study combines published ENA ground-motion attenuation relations into four model forms: single-corner, double-corner, hybrid-empirical, and finite-fault. When substituted in the U.S. Geological Survey 2002 national seismic hazard maps for the five ENA relations originally used in those hazard calculations, the EPRI (2003) relations predict similar ground motions and hazard at short periods (0.5 sec), relative to the 2002 national maps. A major reason for this difference is due to the crustal seismic-wave attenuation model assumed in a few of the ENA relations combined into the EPRI (2003, 2004) models. Although appropriate differences in geometrical spreading models among ENA relations can also be significant, a few ENA relations have 1-Hz Q-values (Q0) that are below the EPRI (1993) consensus range for Q0 when coupled with a geometrical spreading of R-0.5. The EPRI (2003, 2004) single-corner relation is strongly influenced by the inclusion of ENA relations with assumed Q0 below the EPRI (1993) range, which explains much of the discrepancy in predictions at longer periods.

  8. Agreement, Shells, and Focus.

    ERIC Educational Resources Information Center

    Simpson, Andrew; Wu, Zoe

    2002-01-01

    Reconsiders development and licensing of agreement as a syntactic projection and argues for a productive developmental relation between agreement and the category of focus. Suggests that focus projections are initially selected by a variety of functional heads with real semantic content, then, over time decays into a simple concord shell. Upon…

  9. Non-Proliferation Agreements.

    ERIC Educational Resources Information Center

    Swalec, John J.

    1981-01-01

    Discusses five kinds of cooperative agreements established by the College of Lake County (IL): those with other community colleges/technical institutes; the military; business, industry, and organizations; secondary schools; and community and special interest groups. Pays particular attention to two kinds of agreements with other colleges. (CAM)

  10. Cooperative Agreements Study Report.

    ERIC Educational Resources Information Center

    Lawton, R. E.; Magruder, D.

    During the 1983 meeting of the Florida Legislature, action was taken to begin a systematic study of the level of cooperation between the Florida public schools K-12 program and the community and junior colleges. The goals and objectives of the Cooperative Agreements Study were to review and compile a list of the cooperative agreements and identify…

  11. The Helsinki Agreement

    ERIC Educational Resources Information Center

    Babel: Journal of the Australian Federation of Modern Language Teachers' Associations, 1977

    1977-01-01

    A reprint of sections of the Helsinki agreement dealing with foreign languages and civilization, and cooperation and exchanges in the field of education. The agreement supports wider knowledge of foreign languages and promotes exchanges, cooperation, lexicography, and specialized programs in adult education. (AMH)

  12. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    SciTech Connect

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  13. FFTF Authorization Agreement

    SciTech Connect

    DAUTEL, W.A.

    2000-09-25

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently in the Fast Flux Test Facility (FFTF). Work must be accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public, and complying with applicable contractual and regulatory requirements. It is the intent of this Agreement to address those items of significant importance in establishing and supporting the FFTF Authorization Envelope, but this Agreement in no way alters the terms and conditions of the Project Hanford Management Contract (PHMC), Contract Number DE-AC06-96RL13200.

  14. Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

    SciTech Connect

    Tom Elicson; Bentley Harwood; Richard Yorg; Heather Lucek; Jim Bouchard; Ray Jukkola; Duan Phan

    2011-03-01

    The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it would have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.

  15. Agreements in Virtual Organizations

    NASA Astrophysics Data System (ADS)

    Pankowska, Malgorzata

    This chapter is an attempt to explain the important impact that contract theory delivers with respect to the concept of virtual organization. The author believes that not enough research has been conducted in order to transfer theoretical foundations for networking to the phenomena of virtual organizations and open autonomic computing environment to ensure the controllability and management of them. The main research problem of this chapter is to explain the significance of agreements for virtual organizations governance. The first part of this chapter comprises explanations of differences among virtual machines and virtual organizations for further descriptions of the significance of the first ones to the development of the second. Next, the virtual organization development tendencies are presented and problems of IT governance in highly distributed organizational environment are discussed. The last part of this chapter covers analysis of contracts and agreements management for governance in open computing environments.

  16. Countries renew rescue agreement

    NASA Astrophysics Data System (ADS)

    Bush, Susan M.

    To insure long-term continuity for the international satellite search and rescue system, COSPAS/SARSAT, an intergovernmental agreement binding the four sponsoring nations to cooperate was signed July 1 in Paris. According to Russell Vollmers of the National Oceanic and Atmospheric Administration, the agreement is binding for 15 years, with an automatic extension.The system marked the fifth anniversary of its first rescue last year, when on September 10, 1982, three persons were rescued. Begun in the 1970s by NASA as an experiment, COSPAS/SARSAT (a Russian-English acronym) is now a cooperative project among the United States, Canada, France, and the Soviet Union. Its goal is to reduce the time required to rescue air and maritime distress victims and also to locate victims who otherwise may not be found, thus using the satellite system as a life-saving device.

  17. Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

    SciTech Connect

    Hadley, Stanton W

    2012-01-01

    Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number

  18. Assessment of pharmacogenomic agreement.

    PubMed

    Safikhani, Zhaleh; El-Hachem, Nehme; Quevedo, Rene; Smirnov, Petr; Goldenberg, Anna; Juul Birkbak, Nicolai; Mason, Christopher; Hatzis, Christos; Shi, Leming; Aerts, Hugo Jwl; Quackenbush, John; Haibe-Kains, Benjamin

    2016-01-01

    In 2013 we published an analysis demonstrating that drug response data and gene-drug associations reported in two independent large-scale pharmacogenomic screens, Genomics of Drug Sensitivity in Cancer (GDSC) and Cancer Cell Line Encyclopedia (CCLE), were inconsistent. The GDSC and CCLE investigators recently reported that their respective studies exhibit reasonable agreement and yield similar molecular predictors of drug response, seemingly contradicting our previous findings. Reanalyzing the authors' published methods and results, we found that their analysis failed to account for variability in the genomic data and more importantly compared different drug sensitivity measures from each study, which substantially deviate from our more stringent consistency assessment. Our comparison of the most updated genomic and pharmacological data from the GDSC and CCLE confirms our published findings that the measures of drug response reported by these two groups are not consistent. We believe that a principled approach to assess the reproducibility of drug sensitivity predictors is necessary before envisioning their translation into clinical settings. PMID:27408686

  19. Assessment of pharmacogenomic agreement

    PubMed Central

    Safikhani, Zhaleh; El-Hachem, Nehme; Quevedo, Rene; Smirnov, Petr; Goldenberg, Anna; Juul Birkbak, Nicolai; Mason, Christopher; Hatzis, Christos; Shi, Leming; Aerts, Hugo JWL; Quackenbush, John; Haibe-Kains, Benjamin

    2016-01-01

    In 2013 we published an analysis demonstrating that drug response data and gene-drug associations reported in two independent large-scale pharmacogenomic screens, Genomics of Drug Sensitivity in Cancer (GDSC) and Cancer Cell Line Encyclopedia (CCLE), were inconsistent. The GDSC and CCLE investigators recently reported that their respective studies exhibit reasonable agreement and yield similar molecular predictors of drug response, seemingly contradicting our previous findings. Reanalyzing the authors’ published methods and results, we found that their analysis failed to account for variability in the genomic data and more importantly compared different drug sensitivity measures from each study, which substantially deviate from our more stringent consistency assessment. Our comparison of the most updated genomic and pharmacological data from the GDSC and CCLE confirms our published findings that the measures of drug response reported by these two groups are not consistent. We believe that a principled approach to assess the reproducibility of drug sensitivity predictors is necessary before envisioning their translation into clinical settings. PMID:27408686

  20. Agreement with Subjects in Lubukusu

    ERIC Educational Resources Information Center

    Diercks, Michael J. K.

    2010-01-01

    This dissertation examines three topics in the morphosyntax of Lubukusu (Bantu, Kenya), all of which are concerned with agreement with subjects: locative inversion, complementizer agreement, and alternative agreement effects in subject extraction. Each topic reports novel Lubukusu data which are both typologically interesting and theoretically…

  1. Mining Agreements with Indian Tribes

    ERIC Educational Resources Information Center

    Luebben, Tom

    1976-01-01

    The article discusses aspects of negotiating agreements for exploration, development, and mining of hard minerals on Indian Reservations. The agreements discussed are typical of copper agreements, but the general points under discussion are applicable to most hard minerals except for uranium, coal, and oil which are substantially different.…

  2. 75 FR 40837 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ....gov . Agreement No.: 011279-027. Title: Latin America Agreement. Parties: ABC Discussion Agreement; Caribbean Shipowners Association; Central America Discussion Agreement; Compania Libra de Navegacion Uruguay... America Discussion Agreement; and Zim Integrated Shipping Services, Ltd. Filing Party: Wayne R. Rohde,...

  3. Byzantine agreement method without authentication

    SciTech Connect

    Reischuk, R.K.

    1983-12-01

    This invention relates to a method for achieving Byzantine agreement without authentication among n 100 communicating processors using event counting and thresholding rather than message exchanges and evaluations.

  4. Experience and grammatical agreement: Statistical learning shapes number agreement production

    PubMed Central

    Haskell, Todd R.; Thornton, Robert; MacDonald, Maryellen C.

    2009-01-01

    A robust result in research on the production of grammatical agreement is that speakers are more likely to produce an erroneous verb with phrases such as the key to the cabinets, with a singular noun followed by a plural one, than with phrases such as the keys to the cabinet, where a plural noun is followed by a singular. These asymmetries are thought to reflect core language production processes. Previous accounts have attributed error patterns to a syntactic number feature present on plurals but not singulars. An alternative approach is presented in which a process similar to structural priming contributes to the error asymmetry via speakers' past experiences with related agreement constructions. A corpus analysis and two agreement production studies test this account. The results suggest that agreement production is shaped by statistical learning from past language experience. Implications for accounts of agreement are discussed. PMID:19942213

  5. Skills agreement. Recipe for success.

    PubMed

    Nolan, Alexis

    2007-06-21

    The aims of the national health Sector Skills Agreement need regional and local implementation by stakeholders to become reality. Work in the East of England will produce a first regional skills agreement later this year. The Harlow Project is producing award winning process on recuitment and retention. PMID:17847967

  6. Evaluation of existing EPRI and INEL test data to determine the worm to worm gear coefficient of friction in Limitorque actuators

    SciTech Connect

    Garza, I.A.

    1996-12-01

    About the last sizing parameter for motor operated valves which has not been determined by utility or NRC sponsored testing is actuator efficiency. A by-product of EPRI testing for valve factors is the measurement of the actuator efficiencies. Motor sizing in this testing provides efficiency testing for motors running near synchronous speed. INEL testing, sponsored by the NRC, for stem factors and rate of loading provides complimentary data for motors loaded down to zero speed. This paper analyzes the data from these two test programs to determine the coefficient of friction for the worm to worm gear interface. This allowed the development of an algorithm for determining the efficiency of actuators which have not been tested. This paper compares the results of this algorithm to the test data to provide a measure of the accuracy of this method for calculating actuator efficiency.

  7. VIPRE (Versatile Internals and Component Program for Reactors; EPRI)-01: A thermal-hydraulic code for reactor cores: Volume 4, Applications: Final report

    SciTech Connect

    Cuta, J.M.; Stewart, C.W.; Koontz, A.S.; Montgomery, S.D.

    1987-04-01

    VIPRE (Versatile Internals and Component Program for Reactors; EPRI) has been developed for nuclear power utility thermal-hydraulic analysis applications. It is designed to help evaluate nuclear reactor core safety limits including minimum departure from nucleate boiling ratio (MDNBR), critical power ratio (CPR), fuel and clad temperatures, and coolant state in normal operation and assumed accident conditions. This volume (Volume 4: Applications) contains extensive comparisons of VIPRE calculations to experimental data. There are also sensitivity studies and evaluations of code numerical and computational performance. In addition, calculations performed by member utilities using VIPRE for comparisons with transient CHF data, and FSAR plant analyses are presented. Comparisons are also presented of plant thermal-hydraulic calculations with VIPRE and other COBRA codes. These calculations demonstrate the suitability of VIPRE for PWR core thermal-hydraulic analysis.

  8. On-Going International Research Program on Irradiated Concrete Conducted by DOE, EPRI and Japan Research Institutions. Roadmap, Achievements and Path Forward

    SciTech Connect

    Le Pape, Yann; Rosseel, Thomas M.

    2015-10-01

    The Joint Department of Energy (DOE)-Electric Power Research Institute (EPRI) Program (Light Water Reactor Sustainability (LWRS) Program–Material Pathway–Concrete and Long-Term Operation (LTO) Program) and US Nuclear Regulatory Commission (NRC) research studies aim at understanding the most prominent degradation modes and their effects on the long-term operation of concrete structures to nuclear power generation. Based on the results of the Expanded Materials Degradation Analysis (EMDA), (NUREG/CR-7153, ORNL/TM-2011/545), irradiated concrete and alkali-silica reaction (ASR)-affected concrete structures are the two prioritized topics of on-going research. This report focuses specifically on the topic of irradiated concrete and summarizes the main accomplishments obtained by this joint program, but also provides an overview of current relevant activities domestically and internationally. Possible paths forward are also suggested to help near-future orientation of this program.

  9. Historical development and evolution of EPRI's post-closure dose assessment of potential releases to the biosphere from the proposed HLW repository at Yucca Mountain.

    PubMed

    Smith, Graham; Kozak, Matthew W

    2011-12-01

    This paper describes the development and evolution of the Electric Power Research Institute's (EPRI) post-closure dose assessment for potential releases of radionuclides from the proposed High Level Waste repository at Yucca Mountain. The starting point for this work was the 1995 publication of Technical Bases for Yucca Mountain Standards by the Commission on Geosciences, Environment and Resources of the National Research Council. This report proposed the development and application of an individual risk-based standard for releases from the repository to replace the existing one, which was based on radionuclide release limits. This in turn implied the development and application of methods to assess radiation doses to humans. Accordingly, EPRI produced a methodology for such dose assessment as part of its Total System Performance Assessment program for the proposed Yucca Mountain repository site. The methodology initially addressed releases via groundwater and then releases associated with extrusive igneous events. The methodology was updated and applied over the following years to take account of regulatory developments, changes in estimates of the source term to the biosphere, peer review through international model comparison exercises, new site generic data, and new data concerning conditions at the point of compliance in Amargosa Valley. The main outputs were Biosphere Dose Conversion Factors, which relate radionuclide levels in environmental media to the annual individual doses to a member of a hypothetical critical group and to the regulator-defined Reasonably Maximally Exposed Individual. Most recently, consideration has been given to uncertainty in the dose estimates based on a probabilistic analysis. The paper provides a perspective on the evolution of the dose assessments in response to the developments listed above. PMID:22048489

  10. Historical development and evolution of EPRI's post-closure dose assessment of potential releases to the biosphere from the proposed HLW repository at Yucca Mountain.

    PubMed

    Smith, Graham; Kozak, Matthew W

    2011-12-01

    This paper describes the development and evolution of the Electric Power Research Institute's (EPRI) post-closure dose assessment for potential releases of radionuclides from the proposed High Level Waste repository at Yucca Mountain. The starting point for this work was the 1995 publication of Technical Bases for Yucca Mountain Standards by the Commission on Geosciences, Environment and Resources of the National Research Council. This report proposed the development and application of an individual risk-based standard for releases from the repository to replace the existing one, which was based on radionuclide release limits. This in turn implied the development and application of methods to assess radiation doses to humans. Accordingly, EPRI produced a methodology for such dose assessment as part of its Total System Performance Assessment program for the proposed Yucca Mountain repository site. The methodology initially addressed releases via groundwater and then releases associated with extrusive igneous events. The methodology was updated and applied over the following years to take account of regulatory developments, changes in estimates of the source term to the biosphere, peer review through international model comparison exercises, new site generic data, and new data concerning conditions at the point of compliance in Amargosa Valley. The main outputs were Biosphere Dose Conversion Factors, which relate radionuclide levels in environmental media to the annual individual doses to a member of a hypothetical critical group and to the regulator-defined Reasonably Maximally Exposed Individual. Most recently, consideration has been given to uncertainty in the dose estimates based on a probabilistic analysis. The paper provides a perspective on the evolution of the dose assessments in response to the developments listed above.

  11. Recent advances in the EPRI high-concentration photovoltaic program. Volume 2: Module and array programs; design, construction, and testing; system and open issues: Interim report

    SciTech Connect

    McNaughton, W.P.; Richman, R.H.

    1992-02-01

    By the early 1980s, Stanford University under contract with the Electric Power Research Institute (EPRI) produced a point-contact photovoltaic cell that has established a number of world record achievements. In 1984 a conceptual design was proposed for a cell package, module, and array system for use in utility-scale commercial power production. Since 1984, EPRI has moved the laboratory concept forward toward commercial application. More than 1500 high concentration cells have been produced in the evolutionary process. Approximately 700 of those cells have been or are presently being installed in fully operational modules for field tests. Over 130 modules have been constructed and are in field testing for electrical, thermal or weathering tests. Two full-sized array structures (each containing 60 instrumented ``thermal`` modules) have been constructed and continue to undergo field testing for alignment, performance, and reliability. This two volume report reviews the key challenges that have confronted the development of a commercial system and describes the program response to those challenges. The intent is to inform interested readers -- utilities, commercializers, researchers -- as to the primary developments and test results that have been achieved. A considerable body of ``raw data`` has been included so that interested researchers can draw their own conclusions without needing to refer to the source documents. Volume 1 discusses design fabrication and performance of the cell; design, construction and testing of the cell package and the design, fabrication and testing of the optical system. Volume 2 reviews the module and array programs, discusses other system issues and presents a short review of the technology`s open issues.

  12. Federal Facility Agreement progress report

    SciTech Connect

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  13. Suspension agreements: The status quota

    SciTech Connect

    1996-01-01

    Since the initial filing of anti-dumping actions uranium imports from the former Soviet Union, a maze of filings, agreements, amendments, bills, measures, and deals have emerged on which only the closest observers remain current. Even with all the actions that have taken place, none of the parties appear content with the status quo and changes to the agreements are ongoing. Given this dynamic state of affairs, a recap of events and a summary of the current agreements is helpful for understanding the concerns of the involved parties and digesting future events.

  14. Good Agreements Make Good Friends

    PubMed Central

    Han, The Anh; Pereira, Luís Moniz; Santos, Francisco C.; Lenaerts, Tom

    2013-01-01

    When starting a new collaborative endeavor, it pays to establish upfront how strongly your partner commits to the common goal and what compensation can be expected in case the collaboration is violated. Diverse examples in biological and social contexts have demonstrated the pervasiveness of making prior agreements on posterior compensations, suggesting that this behavior could have been shaped by natural selection. Here, we analyze the evolutionary relevance of such a commitment strategy and relate it to the costly punishment strategy, where no prior agreements are made. We show that when the cost of arranging a commitment deal lies within certain limits, substantial levels of cooperation can be achieved. Moreover, these levels are higher than that achieved by simple costly punishment, especially when one insists on sharing the arrangement cost. Not only do we show that good agreements make good friends, agreements based on shared costs result in even better outcomes. PMID:24045873

  15. Quick Guide: Power Purchase Agreements

    SciTech Connect

    2010-06-25

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  16. Empirical agreement in model validation.

    PubMed

    Jebeile, Julie; Barberousse, Anouk

    2016-04-01

    Empirical agreement is often used as an important criterion when assessing the validity of scientific models. However, it is by no means a sufficient criterion as a model can be so adjusted as to fit available data even though it is based on hypotheses whose plausibility is known to be questionable. Our aim in this paper is to investigate into the uses of empirical agreement within the process of model validation.

  17. Application Agreement and Integration Services

    NASA Technical Reports Server (NTRS)

    Driscoll, Kevin R.; Hall, Brendan; Schweiker, Kevin

    2013-01-01

    Application agreement and integration services are required by distributed, fault-tolerant, safety critical systems to assure required performance. An analysis of distributed and hierarchical agreement strategies are developed against the backdrop of observed agreement failures in fielded systems. The documented work was performed under NASA Task Order NNL10AB32T, Validation And Verification of Safety-Critical Integrated Distributed Systems Area 2. This document is intended to satisfy the requirements for deliverable 5.2.11 under Task 4.2.2.3. This report discusses the challenges of maintaining application agreement and integration services. A literature search is presented that documents previous work in the area of replica determinism. Sources of non-deterministic behavior are identified and examples are presented where system level agreement failed to be achieved. We then explore how TTEthernet services can be extended to supply some interesting application agreement frameworks. This document assumes that the reader is familiar with the TTEthernet protocol. The reader is advised to read the TTEthernet protocol standard [1] before reading this document. This document does not re-iterate the content of the standard.

  18. 7 CFR 247.4 - Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.4 Agreements. (a) What agreements are..., sex, or disability. (d) What is the duration of required agreements? Agreements between FNS and...

  19. 7 CFR 247.4 - Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.4 Agreements. (a) What agreements are..., sex, or disability. (d) What is the duration of required agreements? Agreements between FNS and...

  20. Gender agreement and multiple referents.

    PubMed

    Finocchiaro, Chiara; Mahon, Bradford Z; Caramazza, Alfonso

    2008-01-01

    We report a new pattern of usage in current, spoken Italian that has implications for both psycholinguistic models of language production and linguistic theories of language change. In Italian, gender agreement is mandatory for both singular and plural nouns. However, when two or more nouns of different grammatical gender appear in a conjoined noun phrase (NP), masculine plural agreement is required. In this study, we combined on-line and off-line methodologies in order to assess the mechanisms involved in gender marking in the context of multiple referents. The results of two pronoun production tasks showed that plural feminine agreement was significantly more difficult than plural masculine agreement. In a separate study using offline judgements of acceptability, we found that agreement violations in Italian are tolerated more readily in the case of feminine conjoined noun phrases (e.g., la mela e la banana 'the:fem apple:fem and the: fem banana: fem') than masculine conjoined noun phrases (e.g., il fiore e il libro 'the:mas flower: mas and the:mas book:mas'). Implications of these results are discussed both at the level of functional architecture within the language production system and at the level of changes in language use. PMID:21037930

  1. Gender agreement and multiple referents.

    PubMed

    Finocchiaro, Chiara; Mahon, Bradford Z; Caramazza, Alfonso

    2008-01-01

    We report a new pattern of usage in current, spoken Italian that has implications for both psycholinguistic models of language production and linguistic theories of language change. In Italian, gender agreement is mandatory for both singular and plural nouns. However, when two or more nouns of different grammatical gender appear in a conjoined noun phrase (NP), masculine plural agreement is required. In this study, we combined on-line and off-line methodologies in order to assess the mechanisms involved in gender marking in the context of multiple referents. The results of two pronoun production tasks showed that plural feminine agreement was significantly more difficult than plural masculine agreement. In a separate study using offline judgements of acceptability, we found that agreement violations in Italian are tolerated more readily in the case of feminine conjoined noun phrases (e.g., la mela e la banana 'the:fem apple:fem and the: fem banana: fem') than masculine conjoined noun phrases (e.g., il fiore e il libro 'the:mas flower: mas and the:mas book:mas'). Implications of these results are discussed both at the level of functional architecture within the language production system and at the level of changes in language use.

  2. Gender agreement and multiple referents

    PubMed Central

    Finocchiaro, Chiara; Mahon, Bradford Z.; Caramazza, Alfonso

    2010-01-01

    We report a new pattern of usage in current, spoken Italian that has implications for both psycholinguistic models of language production and linguistic theories of language change. In Italian, gender agreement is mandatory for both singular and plural nouns. However, when two or more nouns of different grammatical gender appear in a conjoined noun phrase (NP), masculine plural agreement is required. In this study, we combined on-line and off-line methodologies in order to assess the mechanisms involved in gender marking in the context of multiple referents. The results of two pronoun production tasks showed that plural feminine agreement was significantly more difficult than plural masculine agreement. In a separate study using offline judgements of acceptability, we found that agreement violations in Italian are tolerated more readily in the case of feminine conjoined noun phrases (e.g., la mela e la banana ‘the:fem apple:fem and the: fem banana: fem’) than masculine conjoined noun phrases (e.g., il fiore e il libro ‘the:mas flower: mas and the:mas book:mas’). Implications of these results are discussed both at the level of functional architecture within the language production system and at the level of changes in language use.* PMID:21037930

  3. Experience and Grammatical Agreement: Statistical Learning Shapes Number Agreement Production

    ERIC Educational Resources Information Center

    Haskell, Todd R.; Thornton, Robert; MacDonald, Maryellen C.

    2010-01-01

    A robust result in research on the production of grammatical agreement is that speakers are more likely to produce an erroneous verb with phrases such as "the key to the cabinets", with a singular noun followed by a plural one, than with phrases such as "the keys to the cabinet", where a plural noun is followed by a singular. These asymmetries are…

  4. Authenticated algorithms for Byzantine agreement

    SciTech Connect

    Dolev, D.; Strong, H.R.

    1983-11-01

    Reaching agreement in a distributed system in the presence of fault processors is a central issue for reliable computer systems. Using an authentication protocol, one can limit the undetected behavior of faulty processors to a simple failure to relay messages to all intended targets. In this paper the authors show that, in spite of such an ability to limit faulty behavior, and no matter what message types or protocols are allowed, reaching (Byzantine) agreement requires at least t+1 phases or rounds of information exchange, where t is an upper bound on the number of faulty processors. They present algorithms for reaching agreement based on authentication that require a total number of messages sent by correctly operating processors that is polynomial in both t and the number of processors, n. The best algorithm uses only t+1 phases and o(nt) messages. 9 references.

  5. Articulation Agreements Ease the Way.

    ERIC Educational Resources Information Center

    Reese, Susan

    2002-01-01

    Articulation agreements between secondary and postsecondary institutions often provide for granting college credit for course work completed at another institution. They have been described as programs designed to create pathways of learning that ease the transition of students from secondary to postsecondary levels. (JOW)

  6. Block Transfer Agreement Evaluation Project

    ERIC Educational Resources Information Center

    Bastedo, Helena

    2010-01-01

    The objective of this project is to evaluate for the British Columbia Council on Admissions and Transfer (BCCAT) the effectiveness of block transfer agreements (BTAs) in the BC Transfer System and recommend steps to be taken to improve their effectiveness. Findings of this study revealed that institutions want to expand block credit transfer;…

  7. From Electrons Paired to Electric Power Delivered- A Personal Journey in Research and Applications of Superconductivity at IBM, EPRI, and Beyond

    NASA Astrophysics Data System (ADS)

    Grant, Paul

    2014-03-01

    This talk will reprise a personal journey by the speaker in industrial and applied physics, commencing with his employment by IBM at age 17 in the early 1950s, and continuing through his corporate sponsored undergraduate and graduate years at Clarkson and Harvard Universities, resulting in 1965 in a doctorate in applied physics from the latter. He was subsequently assigned by IBM to its research division in San Jose (now Almaden), where he initially carried out both pure and applied theoretical and experimental investigations encompassing a broad range of company-related product technologies...storage, display, printer and data acquisition hardware and software. In 1973, he undertook performing DFT and quantum Monte Carlo calculations in support of group research in the then emerging field of organic and polymer superconductors, a very esoteric pursuit at the time. Following upon several corporate staff assignments involving various product development and sales strategies, in 1982 he was appointed manager of the cooperative phenomena group in the Almaden Research Center, which beginning in early 1987, made significant contributions to both the basic science and applications of high temperature superconductivity (HTSC). In 1993, after a 40-year career, he retired from IBM to accept a Science Fellow position at the Electric Power Research Institute (EPRI) where he funded power application development of superconductivity. In 2004, he retired from his EPRI career to undertake ``due diligence'' consulting services in support of the venture capital community in Silicon Valley. As a ``hobby,'' he currently pursues and publishes DFT studies in hope of discovering the pairing mechanism of HTSC. In summary, the speaker's career in industrial and applied physics demonstrates one can combine publishing a record three PRLs in one month with crawling around underground in substations with utility lineman helping install superconducting cables, along the way publishing 10

  8. 48 CFR 16.702 - Basic agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Basic agreements. 16.702... AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 16.702 Basic agreements. (a) Description. A basic... attachment the required and applicable clauses agreed upon in the basic agreement. A basic agreement is not...

  9. 48 CFR 16.702 - Basic agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Basic agreements. 16.702... AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 16.702 Basic agreements. (a) Description. A basic... attachment the required and applicable clauses agreed upon in the basic agreement. A basic agreement is not...

  10. 48 CFR 16.702 - Basic agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Basic agreements. 16.702... AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 16.702 Basic agreements. (a) Description. A basic... attachment the required and applicable clauses agreed upon in the basic agreement. A basic agreement is not...

  11. 48 CFR 16.702 - Basic agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Basic agreements. 16.702... AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 16.702 Basic agreements. (a) Description. A basic... attachment the required and applicable clauses agreed upon in the basic agreement. A basic agreement is not...

  12. 48 CFR 16.702 - Basic agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Basic agreements. 16.702... AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 16.702 Basic agreements. (a) Description. A basic... attachment the required and applicable clauses agreed upon in the basic agreement. A basic agreement is not...

  13. 78 FR 15951 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... agreement. Agreement No.: 012196. Title: MSC/CSAV Ecuador--North Europe Vessel Sharing Agreement. Parties... on the U.S. East Coast on the one hand, and from ports on the U.S. East Coast to Panama and...

  14. 75 FR 11180 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ....gov . Agreement No.: 011730-003. Title: GWF/Dole Space Charter and Sailing Agreement. Parties: Dole... China-US Pacific Coast Two-Loop Space Charter, Sailing and Cooperative Working Agreement. Parties:...

  15. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  16. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  17. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  18. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  19. 40 CFR 35.1615 - Substate agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 CFR 33.240 (Intergovernmental agreements). A State may enter into an agreement with a substate... STATE AND LOCAL ASSISTANCE Cooperative Agreements for Protecting and Restoring Publicly Owned...

  20. 77 FR 61751 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... Agreement. Parties: Crowley Latin America Services, LLC and A.P. Moller-Maersk A/S Filing Party: Wayne R... . Agreement No.: 012155-001. Title: MSC/Zim South America East Coast Vessel Sharing Agreement....

  1. Proceedings from the 5th International Symposium on Light and Human Health: November 3-5, 2002, Orlando, Florida--EPRI Lighting Research Office

    SciTech Connect

    2004-05-01

    The 5th EPRI/LRO Lighting Research Symposium (November, 2002) was organized to present and examine current research information on the subject of Light and Human Health in response to a growing sense that light--both electric lighting and daylighting--impacts human beings well beyond what has been traditionally studied as vision and visual performance. This Final Report of the Symposium is a collection of 23 presented and seven poster papers grouped under the following headings: (1) Medical Applications of Light; (2) Circadian Effects of Light; (3) Hazards of Optical Radiation; and (4) Environmental Applications and Human Factors. Research from the medical, measurement, elderly, lighting, psychological, and vision fields is included, as well as an extensive commentary and summary. The direction of the research, taken as a whole, indicates that the definition of ''good lighting'' should be expanded to include ''healthy lighting,'' and that ongoing research will require better measurement and specification tools such as a new system of circadian photometry. Enhanced interaction between the medical research and lighting design communities will be required to bring the benefits of what is being discovered into common lighting practice.

  2. Limiting technology by negotiated agreement

    SciTech Connect

    Carnesale, A.

    1983-01-01

    The author concentrates on anti-ballistic missile (ABM) systems as an example of a continuing effort to limit technology by negotiated agreement. He first discusses the ABM treaty of 1972, ratified by both the US and the USSR. Afterwards, he briefly treats each of the following: ballistic missile defense (BMD) dilemmas; nature of the BMD choice; technology; economics; deterrence; nuclear warfighting; relations with allies; arms control; Star Wars; and on limiting technology.

  3. Measurement Challenges in International Agreements

    NASA Astrophysics Data System (ADS)

    Luke, John

    2006-10-01

    Making measurements in support of international agreements can pose many challenges both from a policy and science point of view. Policy issues may arise because physics measurements made in the area of arms control or disarmament may be deemed too intrusive since they could possibly reveal sensitive information about the material that is being interrogated. Therefore, agreements must include a framework for safeguarding against the potential release of this information. Most of the scientific issues center around the fact that it is desirable to make high quality measurements without any operator interaction. This leads to the development of instrumentation and software that are very stable and robust. Due to different concerns, policy and science priorities may be at odds with one another. Therefore, it is the scientist's challenge - in this field - to keep policy makers informed by conveying what is technically possible and what is not in a manner that is easily understood and also negotiable. In this paper we will discuss some of the technology that has been developed to address some of these challenges in various international and model agreements. We will discuss the principle of informational barrier used in these measurement technologies to safeguard the release of sensitive information. We will also discuss some of the pitfalls that may arise when policy is ill informed about the physical constraints in the making of measurements of nuclear materials.

  4. 32 CFR 78.7 - Standard agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Standard agreement. 78.7 Section 78.7 National... VOLUNTARY STATE TAX WITHHOLDING FROM RETIRED PAY § 78.7 Standard agreement. Standard Agreement For Voluntary..., hereafter referred to as the “Standard Agreement,” establishes administrative procedures and...

  5. 48 CFR 3416.702 - Basic agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Basic agreements. 3416.702... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 3416.702 Basic agreements. (a)-(d) (e) Negotiated overhead rates. Basic agreements may include negotiated overhead rates for...

  6. 78 FR 26779 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... reflects the suspension of the agreement, effective May 1, 2013 through April 14, 2015. Agreement No... the fact that the parties have agreed to charter and rationalize vessel space among themselves and...). Agreement No.: 012206. Title: Industria Armamento Meridionale S.P.A./K-Line Space Charter Agreement....

  7. 2 CFR 182.620 - Cooperative agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agreement. Cooperative agreement means an award of financial assistance that, consistent with 31 U.S.C. 6305... development agreements as defined in 15 U.S.C. 3710a. ... MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS NATIONAL POLICY...

  8. 5 CFR 2421.20 - Election agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Election agreement. 2421.20 Section 2421... Election agreement. Election agreement means an agreement under part 2422 of this subchapter signed by all... representation election in an appropriate unit....

  9. 5 CFR 2421.20 - Election agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 3 2012-01-01 2012-01-01 false Election agreement. 2421.20 Section 2421... Election agreement. Election agreement means an agreement under part 2422 of this subchapter signed by all... representation election in an appropriate unit....

  10. 5 CFR 2421.20 - Election agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Election agreement. 2421.20 Section 2421... Election agreement. Election agreement means an agreement under part 2422 of this subchapter signed by all... representation election in an appropriate unit....

  11. 5 CFR 2421.20 - Election agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 3 2014-01-01 2014-01-01 false Election agreement. 2421.20 Section 2421... Election agreement. Election agreement means an agreement under part 2422 of this subchapter signed by all... representation election in an appropriate unit....

  12. 5 CFR 2421.20 - Election agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Election agreement. 2421.20 Section 2421... Election agreement. Election agreement means an agreement under part 2422 of this subchapter signed by all... representation election in an appropriate unit....

  13. 7 CFR 1948.98 - Grant agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Grant agreements. 1948.98 Section 1948.98 Agriculture... § 1948.98 Grant agreements. The following Grant Agreements are a part of this regulation. (a) Exhibit A of this subpart is a Grant Agreement for Growth Management and Housing Planning Grants for...

  14. 7 CFR 1948.98 - Grant agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Grant agreements. 1948.98 Section 1948.98 Agriculture... § 1948.98 Grant agreements. The following Grant Agreements are a part of this regulation. (a) Exhibit A of this subpart is a Grant Agreement for Growth Management and Housing Planning Grants for...

  15. 7 CFR 1415.11 - Restoration agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Restoration agreements. 1415.11 Section 1415.11... Restoration agreements. (a) Restoration agreements are only authorized to be used in conjunction with... a restoration agreement is needed. Such a determination is also subject to the availability...

  16. 7 CFR 1415.11 - Restoration agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Restoration agreements. 1415.11 Section 1415.11... Restoration agreements. (a) Restoration agreements are only authorized to be used in conjunction with... a restoration agreement is needed. Such a determination is also subject to the availability...

  17. 7 CFR 947.111 - Marketing agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Marketing agreement. 947.111 Section 947.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... Definitions § 947.111 Marketing agreement. Marketing agreement means Marketing Agreement No. 114, as amended....

  18. 7 CFR 947.111 - Marketing agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Marketing agreement. 947.111 Section 947.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... Definitions § 947.111 Marketing agreement. Marketing agreement means Marketing Agreement No. 114, as amended....

  19. 46 CFR 356.41 - Management agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Management agreements. 356.41 Section 356.41 Shipping..., Management Agreements and Exclusive or Long-Term Contracts § 356.41 Management agreements. (a) An owner or bareboat charterer of a Fishing Industry Vessel may enter into a management agreement with a Non-Citizen...

  20. 25 CFR 163.71 - Agreement funding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Agreement funding. 163.71 Section 163.71 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Cooperative Agreements § 163.71 Agreement funding. In cooperative agreements, the Secretary is authorized to advance...

  1. 25 CFR 163.71 - Agreement funding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Agreement funding. 163.71 Section 163.71 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Cooperative Agreements § 163.71 Agreement funding. In cooperative agreements, the Secretary is authorized to advance...

  2. 25 CFR 163.71 - Agreement funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Agreement funding. 163.71 Section 163.71 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Cooperative Agreements § 163.71 Agreement funding. In cooperative agreements, the Secretary is authorized to advance...

  3. 25 CFR 163.71 - Agreement funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Agreement funding. 163.71 Section 163.71 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Cooperative Agreements § 163.71 Agreement funding. In cooperative agreements, the Secretary is authorized to advance...

  4. 25 CFR 163.71 - Agreement funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Agreement funding. 163.71 Section 163.71 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Cooperative Agreements § 163.71 Agreement funding. In cooperative agreements, the Secretary is authorized to advance...

  5. 77 FR 10743 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... . Agreement No.: 011353-036. Title: The Credit Agreement. Parties: Crowley Latin America Services, LLC; Dole..., DC 20006-4007. Synopsis: The amendment deletes Crowley Latin American Services, LLC and a King Ocean entity as a party to the Agreement. Agreement No.: 012155. Title: MSC/Zim South America East Coast...

  6. 7 CFR 947.111 - Marketing agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Marketing agreement. 947.111 Section 947.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... Definitions § 947.111 Marketing agreement. Marketing agreement means Marketing Agreement No. 114, as amended....

  7. 7 CFR 947.111 - Marketing agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Marketing agreement. 947.111 Section 947.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... Definitions § 947.111 Marketing agreement. Marketing agreement means Marketing Agreement No. 114, as amended....

  8. 7 CFR 947.111 - Marketing agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Marketing agreement. 947.111 Section 947.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... Definitions § 947.111 Marketing agreement. Marketing agreement means Marketing Agreement No. 114, as amended....

  9. 27 CFR 70.485 - Closing agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2012-04-01 2011-04-01 true Closing agreements. 70.485... Relating to Alcohol, Tobacco, Firearms, and Explosives Administrative Remedies § 70.485 Closing agreements... taxable period ending prior or subsequent to the date of such agreement. A closing agreement may...

  10. 27 CFR 70.485 - Closing agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2013-04-01 2013-04-01 false Closing agreements. 70.485... Relating to Alcohol, Tobacco, Firearms, and Explosives Administrative Remedies § 70.485 Closing agreements... taxable period ending prior or subsequent to the date of such agreement. A closing agreement may...

  11. 27 CFR 70.485 - Closing agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Closing agreements. 70.485... Relating to Alcohol, Tobacco, Firearms, and Explosives Administrative Remedies § 70.485 Closing agreements... taxable period ending prior or subsequent to the date of such agreement. A closing agreement may...

  12. 27 CFR 70.485 - Closing agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2011-04-01 2011-04-01 false Closing agreements. 70.485... Relating to Alcohol, Tobacco, Firearms, and Explosives Administrative Remedies § 70.485 Closing agreements... taxable period ending prior or subsequent to the date of such agreement. A closing agreement may...

  13. 27 CFR 70.485 - Closing agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2014-04-01 2014-04-01 false Closing agreements. 70.485... Relating to Alcohol, Tobacco, Firearms, and Explosives Administrative Remedies § 70.485 Closing agreements... taxable period ending prior or subsequent to the date of such agreement. A closing agreement may...

  14. 40 CFR 46.170 - Fellowship agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Fellowship agreement. 46.170 Section 46... FELLOWSHIPS Award § 46.170 Fellowship agreement. (a) The “Fellowship Agreement” (EPA Form 5770-8) is the written agreement, including amendments, between EPA and you. The fellowship agreement will state...

  15. 40 CFR 46.170 - Fellowship agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Fellowship agreement. 46.170 Section 46... FELLOWSHIPS Award § 46.170 Fellowship agreement. (a) The “Fellowship Agreement” (EPA Form 5770-8) is the written agreement, including amendments, between EPA and you. The fellowship agreement will state...

  16. 40 CFR 46.170 - Fellowship agreement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Fellowship agreement. 46.170 Section 46... FELLOWSHIPS Award § 46.170 Fellowship agreement. (a) The “Fellowship Agreement” (EPA Form 5770-8) is the written agreement, including amendments, between EPA and you. The fellowship agreement will state...

  17. 40 CFR 46.170 - Fellowship agreement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Fellowship agreement. 46.170 Section 46... FELLOWSHIPS Award § 46.170 Fellowship agreement. (a) The “Fellowship Agreement” (EPA Form 5770-8) is the written agreement, including amendments, between EPA and you. The fellowship agreement will state...

  18. 40 CFR 46.170 - Fellowship agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Fellowship agreement. 46.170 Section 46... FELLOWSHIPS Award § 46.170 Fellowship agreement. (a) The “Fellowship Agreement” (EPA Form 5770-8) is the written agreement, including amendments, between EPA and you. The fellowship agreement will state...

  19. Final results for the EPRI-DOE-SCS Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates

    SciTech Connect

    Burford, D.P.

    1997-12-31

    The Yates Clean Coal Project was a co-funded Clean Coal Technology effort, sponsored by the US Department of Energy, the Electric Power Research Institute and Southern Company Services (EPRI-DOE-SCS) to evaluate a retrofit wet-limestone-based, sulfur dioxide (SO{sub 2}) scrubbing system in treating the hot flue gases of a coal-fired, 110MW electric utility boiler. This Project tested the operational limits of Chiyoda`s CT-121 Jet Bubbling Reactor System (JBR ) at Georgia Power`s Plant Yates from 1992 through 1994. Although the original test plan called for a very conservative assessment, the CT-121 system proved robust, so it was tested at widely varying conditions. Fuel sulfur content was varied between 1.5% to 4.3%, various limestone sources at several grind sizes were used, particulate removal and air toxics performance were measured and by-product gypsum soil amendment experimentation was conducted. In all cases, the CT-121 system gave encouraging results with predictably high SO{sub 2} removals (95--99%) and particulate removals (99+%) at all conditions with high reliability. Closed loop operations (no liquids treated, none discharged) called for the extensive application of corrosion impervious, fiberglass reinforced plastics (FRP) that was also very successful. Gypsum by-product proved to be significant as a soil enhancement and was granted a plant food license by the State of Georgia. So far, the Yates Project has received several awards from industry and environmental groups for its performance including Power Plant of the Year in 1994 from Power magazine.

  20. International Agreement on Planetary Protection

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The maintenance of a NASA policy, is consistent with international agreements. The planetary protection policy management in OSS, with Field Center support. The advice from internal and external advisory groups (NRC, NAC/Planetary Protection Task Force). The technology research and standards development in bioload characterization. The technology research and development in bioload reduction/sterilization. This presentation focuses on: forward contamination - research on the potential for Earth life to exist on other bodies, improved strategies for planetary navigation and collision avoidance, and improved procedures for sterile spacecraft assembly, cleaning and/or sterilization; and backward contamination - development of sample transfer and container sealing technologies for Earth return, improvement in sample return landing target assessment and navigation strategy, planning for sample hazard determination requirements and procedures, safety certification, (liaison to NEO Program Office for compositional data on small bodies), facility planning for sample recovery system, quarantine, and long-term curation of 4 returned samples.

  1. Sexual Agreements among Gay Male Couples

    PubMed Central

    Hoff, Colleen H.; Beougher, Sean C.

    2009-01-01

    Many gay male couples make agreements about whether or not to permit sex with outside partners, yet little is known about the development and maintenance of these agreements, their impact on relationships, and whether they are an effective HIV prevention strategy. Using semi-structured, qualitative interviews, 39 gay male couples were asked about their sexual agreements and about other relationship dynamics that might affect their agreements. Analysis revealed a wide range of agreement types, all of which are presented along a continuum rather than as discrete categories. For couples with open agreements, most placed rules or conditions limiting when, where, how often, and with whom outside sex was permitted. Although motivations for having agreements varied, HIV prevention did not rank as a primary factor for any couple. Most couples had congruous agreements; however, a small number reported discrepancies which may increase HIV transmission risk. How couples handled breaks in their agreements also varied, depending on what condition was broken, whether it was disclosed, and the partner's reaction. Additional results include differences in agreement type and motivations for having an agreement based on couple serostatus. Overall, agreements benefited couples by providing boundaries for the relationship, supporting a non-heteronormative identity, and fulfilling the sexual needs of the couple. Future prevention efforts involving gay couples must address the range of agreement types and the meanings couples ascribe to them, in addition to tempering safety messages with the relationship issues that are important to and faced by gay couples. PMID:18686027

  2. 22 CFR 124.1 - Manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Manufacturing license agreements and technical... ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT AND OTHER DEFENSE SERVICES § 124.1 Manufacturing... manufacturing license agreements, technical assistance agreements, distribution agreements, or...

  3. 22 CFR 124.1 - Manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Manufacturing license agreements and technical... ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT AND OTHER DEFENSE SERVICES § 124.1 Manufacturing... manufacturing license agreements, technical assistance agreements, distribution agreements, or...

  4. 22 CFR 124.1 - Manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Manufacturing license agreements and technical... ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT, AND OTHER DEFENSE SERVICES § 124.1 Manufacturing... manufacturing license agreements, technical assistance agreements, distribution agreements, or...

  5. 22 CFR 124.1 - Manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Manufacturing license agreements and technical... ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT AND OTHER DEFENSE SERVICES § 124.1 Manufacturing... manufacturing license agreements, technical assistance agreements, distribution agreements, or...

  6. 22 CFR 124.1 - Manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Manufacturing license agreements and technical... ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT AND OTHER DEFENSE SERVICES § 124.1 Manufacturing... manufacturing license agreements, technical assistance agreements, distribution agreements, or...

  7. Perceptions of patient provider agreements

    PubMed Central

    Albrecht, Jennifer S.; Khokhar, Bilal; Pradel, Françoise; Campbell, Michelle; Palmer, Jacqueline; Harris, Ilene; Palumbo, Francis

    2016-01-01

    Objectives Use of patient provider agreements (PPAs) is increasing, yet there is limited evidence on the effectiveness of PPAs to prevent prescription opioid misuse and diversion, and few guidelines for providers. We conducted eight focus groups to understand patient and prescriber perceptions of PPAs. Methods We recruited 40 patients who had been asked to sign a PPA and 40 prescribers who had administered at least one PPA. We developed topic guides for the two groups based on prior literature. Focus groups were audio-recorded and transcribed verbatim. Two investigators independently performed the content analysis of the transcripts and reached consensus on recurring themes. Key findings PPA use varied according to physician specialty. General practitioners used PPAs the least but reported increasing pressure from liability insurers to use them. Many patients reported signing a PPA in the emergency room of a hospital. Prescribers and patients reported a lack of understanding among patients concerning the purpose and content of the PPA. Prescribers questioned the legal status of the PPA, while patients believed that the PPA was a legal document intended to protect prescribers. Patients and prescribers valued PPA content items differently, although both groups agreed that signing a PPA would not prevent opioid misuse. Conclusions We identified several themes concerning the administration, content, effectiveness and utility of PPAs that highlight areas of research to improve PPAs. We also describe trends requiring further investigation. Understanding content of importance to patients will facilitate the development of a patient-centred PPA. PMID:27293486

  8. Monitoring of Biomedical License Agreements

    PubMed Central

    Keller, George H.; Ferguson, Steven M.; Pan, Percy

    2009-01-01

    Because technology licensed from research organizations can play a significant role in drug innovation and the generation of novel biomedical products, licensee performance under such agreements must be effectively monitored. This is necessary so that resultant benefits, including public health improvement, may be returned to the innovator(s) as well as society at large. The tasks that comprise monitoring are varied, but all come under the general heading of ‘enforcement of license provisions’. Since 1996, the license monitoring and enforcement program established by the US National Institutes of Health (NIH) Group has collected about $US17 million in unpaid and underpaid license royalties through formal financial audits and other investigative activities. During the same period, the Office of Technology Transfer (OTT) settled more than 60 cases of suspected patent infringement, generating around 60 new licenses and collected both back and ongoing royalties. As these numbers show, an active and effective monitoring program is an essential part of any technology transfer or biomedical licensing program. PMID:19960074

  9. 14 CFR 437.35 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Operational Safety Documentation § 437.35 Agreements. An applicant must enter into the agreements required by § 437.63, and...

  10. 14 CFR 437.35 - Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Operational Safety Documentation § 437.35 Agreements. An applicant must enter into the agreements required by § 437.63, and...

  11. 75 FR 61757 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ....: 012071-001. Title: APL/Hanjin Reciprocal Space Charter Agreement. Parties: American President Lines, Ltd... Agreement. Parties: Eagle Marine Services, Ltd.; Ports of America Outer Harbor Terminal, LLC; Port...

  12. 75 FR 150 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-04

    ... the members to address issues relating to environmental initiatives and the reduction of air and water pollution. Agreement No.: 012008-004. Title: The 360 Quality Association Agreement. Parties: NYKCool AB...

  13. 76 FR 12962 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ....gov . Agreement No.: 011885-002. Title: CMA CGM/MSC Reciprocal Space Charter, Sailing and Cooperative... Coast Two-Loop Space Charter, Sailing and Cooperative Working Agreement. Parties: A.P. Moller-Maersk...

  14. 37 CFR 42.409 - Settlement agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF COMMERCE TRIAL PRACTICE BEFORE THE PATENT TRIAL AND APPEAL BOARD Derivation After Institution of Derivation Proceeding § 42.409 Settlement agreements. An agreement or understanding under 35 U.S.C. 135(e)...

  15. 75 FR 31438 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ... Lines Joint Service Agreement. Filing Party: Tara L. Leiter, Esq.; Blank Rome, LLP; Watergate; 600 New... Service Agreement. Filing Party: Tara L. Leiter, Esq.; Blank Rome, LLP; Watergate; 600 New...

  16. 47 CFR 51.303 - Preexisting agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) INTERCONNECTION... interconnection agreements between an incumbent LEC and a telecommunications carrier, including those negotiated... approval pursuant to section 252(e) of the Act. (b) Interconnection agreements negotiated before February...

  17. 77 FR 71001 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ..., updates both parties address, and various other changes. Agreement No.: 012187-000. Title: Siem Car Carrier Pacific AS/Hoegh Autoliners, Inc. Space Charter Agreement. Parties: Siem Car Carrier Pacific...

  18. 32 CFR 37.1260 - Cooperative agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1260 Cooperative... the cooperative agreement. The term does not include “cooperative research and development...

  19. 77 FR 1689 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... . Agreement No.: 012150. Title: COSCON/POS Space Charter and Sailing Agreement. Parties: COSCO Container Lines... COSCO to charter space to Hainan POS in the trade between U.S. West Coast ports and ports in China...

  20. 75 FR 20849 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    .... Agreement No.: 011075-073. Title: Central America Discussion Agreement. Parties: APL Co. PTE Ltd.; Crowley Latin America Services, LLC.; Dole Ocean Cargo Express; Great White Fleet; King Ocean Services...

  1. Legal issues critical in software license agreements.

    PubMed

    Manfredi, M J; Peterson, D M

    1989-05-01

    The complex legal aspects of software license agreements are addressed in this final part of a three-part series. A healthcare organization that has selected a software vendor and has reviewed the central provisions of a licensing agreement must then take a close look at the other provisions of the agreement. These include numerous legal provisions, regulatory requirements, and ancillary agreements related to maintenance and access to the software.

  2. 34 CFR 84.620 - Cooperative agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Cooperative agreement. 84.620 Section 84.620 Education Office of the Secretary, Department of Education GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 84.620 Cooperative agreement. Cooperative agreement means an award...

  3. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs:...

  4. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs:...

  5. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs:...

  6. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs:...

  7. 19 CFR 118.3 - Written agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 1 2013-04-01 2013-04-01 false Written agreement. 118.3 Section 118.3 Customs... CENTRALIZED EXAMINATION STATIONS General Provisions § 118.3 Written agreement. The applicant tentatively selected to operate a CES must sign a written agreement with CBP before commencing operations. Failure...

  8. 5 CFR 370.105 - Written agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Written agreements. 370.105 Section 370... TECHNOLOGY EXCHANGE PROGRAM § 370.105 Written agreements. Before the detail begins, the agency and private sector organization must enter into a written agreement with the individual(s) detailed. The...

  9. 19 CFR 118.3 - Written agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Written agreement. 118.3 Section 118.3 Customs... CENTRALIZED EXAMINATION STATIONS General Provisions § 118.3 Written agreement. The applicant tentatively selected to operate a CES must sign a written agreement with CBP before commencing operations. Failure...

  10. 5 CFR 370.105 - Written agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Written agreements. 370.105 Section 370... TECHNOLOGY EXCHANGE PROGRAM § 370.105 Written agreements. Before the detail begins, the agency and private sector organization must enter into a written agreement with the individual(s) detailed. The...

  11. 19 CFR 118.3 - Written agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 1 2014-04-01 2014-04-01 false Written agreement. 118.3 Section 118.3 Customs... CENTRALIZED EXAMINATION STATIONS General Provisions § 118.3 Written agreement. The applicant tentatively selected to operate a CES must sign a written agreement with CBP before commencing operations. Failure...

  12. 19 CFR 118.3 - Written agreement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Written agreement. 118.3 Section 118.3 Customs... CENTRALIZED EXAMINATION STATIONS General Provisions § 118.3 Written agreement. The applicant tentatively selected to operate a CES must sign a written agreement with CBP before commencing operations. Failure...

  13. 5 CFR 370.105 - Written agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Written agreements. 370.105 Section 370... TECHNOLOGY EXCHANGE PROGRAM § 370.105 Written agreements. Before the detail begins, the agency and private sector organization must enter into a written agreement with the individual(s) detailed. The...

  14. 5 CFR 370.105 - Written agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Written agreements. 370.105 Section 370... TECHNOLOGY EXCHANGE PROGRAM § 370.105 Written agreements. Before the detail begins, the agency and private sector organization must enter into a written agreement with the individual(s) detailed. The...

  15. 78 FR 75345 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ...@fmc.gov . Agreement No.; 011314-002. Title: CSAV/Trans Global Cooperative Working Agreement. Parties: Compania Sud Americana de Vapores S.A. and Trans Global Shipping NV. Filing Party: Walter H. Lion Esq.; Mc... party Swordfish Shipping Inc. to Trans Global Shipping NV and changes the agreement's termination...

  16. 48 CFR 519.7010 - Agreement contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Agreement contents. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7010 Agreement contents. The contents of the Agreement must contain: (a) Names, addresses (including facsimile, e-mail, and...

  17. 48 CFR 519.7010 - Agreement contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Agreement contents. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7010 Agreement contents. The contents of the Agreement must contain: (a) Names, addresses (including facsimile, e-mail, and...

  18. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Credit agreements. 1819... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement...

  19. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Credit agreements. 1819... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement...

  20. 49 CFR 1325.2 - Credit agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Credit agreements. 1325.2 Section 1325.2... OF TRANSPORTATION (CONTINUED) CARRIER RATES AND SERVICE TERMS EXTENSION OF CREDIT TO CANDIDATES FOR FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.2 Credit agreements. (a) All agreements to extend credit...

  1. 49 CFR 1325.2 - Credit agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Credit agreements. 1325.2 Section 1325.2... OF TRANSPORTATION (CONTINUED) CARRIER RATES AND SERVICE TERMS EXTENSION OF CREDIT TO CANDIDATES FOR FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.2 Credit agreements. (a) All agreements to extend credit...

  2. 49 CFR 1325.2 - Credit agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Credit agreements. 1325.2 Section 1325.2... OF TRANSPORTATION (CONTINUED) CARRIER RATES AND SERVICE TERMS EXTENSION OF CREDIT TO CANDIDATES FOR FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.2 Credit agreements. (a) All agreements to extend credit...

  3. 49 CFR 1325.2 - Credit agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Credit agreements. 1325.2 Section 1325.2... OF TRANSPORTATION (CONTINUED) CARRIER RATES AND SERVICE TERMS EXTENSION OF CREDIT TO CANDIDATES FOR FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.2 Credit agreements. (a) All agreements to extend credit...

  4. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Credit agreements. 1819... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement...

  5. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Credit agreements. 1819... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement...

  6. 49 CFR 1325.2 - Credit agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Credit agreements. 1325.2 Section 1325.2... OF TRANSPORTATION (CONTINUED) CARRIER RATES AND SERVICE TERMS EXTENSION OF CREDIT TO CANDIDATES FOR FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.2 Credit agreements. (a) All agreements to extend credit...

  7. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Credit agreements. 1819... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement...

  8. 77 FR 42310 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... . Agreement No.: 012119-001. Title: Maersk Line/CMA CGM TP5 Space Charter Agreement. Parties: A.P. Moller... Glovis Co., Ltd. Space Charter Agreement. Parties: Siem Car Carrier Pacific AS; Hyundai Glovis Co., Ltd..., Japan, Philippines, Singapore, and China), and authorizes the mutual chartering of space between...

  9. 7 CFR 247.4 - Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Agreements. 247.4 Section 247.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.4 Agreements. (a) What agreements are necessary for agencies to administer...

  10. 7 CFR 247.4 - Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Agreements. 247.4 Section 247.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.4 Agreements. (a) What agreements are necessary for agencies to administer...

  11. 7 CFR 247.4 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Agreements. 247.4 Section 247.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.4 Agreements. (a) What agreements are necessary for agencies to administer...

  12. 46 CFR Sec. 3 - Standby agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Standby agreements. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS FEDERAL PORT CONTROLLERS Sec. 3 Standby agreements. The Director, NSA, may negotiate the standard form of service agreement, specified...

  13. 46 CFR Sec. 3 - Standby agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Standby agreements. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS FEDERAL PORT CONTROLLERS Sec. 3 Standby agreements. The Director, NSA, may negotiate the standard form of service agreement, specified...

  14. 46 CFR Sec. 3 - Standby agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Standby agreements. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS FEDERAL PORT CONTROLLERS Sec. 3 Standby agreements. The Director, NSA, may negotiate the standard form of service agreement, specified...

  15. 76 FR 38177 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... space in the trade from Vietnam to U.S. West Coast. Agreement No.: 012132. Title: Crowley/King Ocean Charter and Sailing Agreement. Parties: Crowley Latin America Services, LLC and King Ocean Services..., DC 20006. Synopsis: The agreement authorizes King Ocean to charter space to Crowley in the...

  16. 77 FR 28880 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... geographic scope of the agreement. Agreement No.: 012170. Title: Crowley/SC Line Space Charter and Sailing Agreement. Parties: Crowley Latin America Services, LLC and SC Line. Filing Party: Wayne R. Rohde, Esquire... authorizes SC Line to charter space to Crowley in the trade between the U.S. Atlantic Coast and ports...

  17. 77 FR 5013 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  18. 77 FR 45610 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the...

  19. 78 FR 25443 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  20. 78 FR 23251 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  1. 76 FR 51033 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the...

  2. 76 FR 52954 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the...

  3. 77 FR 40881 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  4. 76 FR 31962 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  5. 76 FR 34992 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  6. 77 FR 50688 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the...

  7. 77 FR 54911 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  8. 78 FR 30302 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  9. 76 FR 81933 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to...

  10. 46 CFR 535.404 - Agreement provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Agreement provisions. 535.404 Section 535.404 Shipping FEDERAL MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Filing of Agreements §...

  11. 48 CFR 416.702 - Basic agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Basic agreements. 416.702... CONTRACT TYPES TYPES OF CONTRACTS Agreements 416.702 Basic agreements. Promptly after execution by the Government, the HCA shall furnish to the Senior Procurement Executive a copy of each basic...

  12. 48 CFR 416.702 - Basic agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Basic agreements. 416.702... CONTRACT TYPES TYPES OF CONTRACTS Agreements 416.702 Basic agreements. Promptly after execution by the Government, the HCA shall furnish to the Senior Procurement Executive a copy of each basic...

  13. 48 CFR 416.702 - Basic agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Basic agreements. 416.702... CONTRACT TYPES TYPES OF CONTRACTS Agreements 416.702 Basic agreements. Promptly after execution by the Government, the HCA shall furnish to the Senior Procurement Executive a copy of each basic...

  14. 48 CFR 416.702 - Basic agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Basic agreements. 416.702... CONTRACT TYPES TYPES OF CONTRACTS Agreements 416.702 Basic agreements. Promptly after execution by the Government, the HCA shall furnish to the Senior Procurement Executive a copy of each basic...

  15. 48 CFR 416.702 - Basic agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Basic agreements. 416.702... CONTRACT TYPES TYPES OF CONTRACTS Agreements 416.702 Basic agreements. Promptly after execution by the Government, the HCA shall furnish to the Senior Procurement Executive a copy of each basic...

  16. 48 CFR 519.7010 - Agreement contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Agreement contents. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7010 Agreement contents. The contents of the Agreement must contain: (a) Names, addresses (including facsimile, e-mail, and...

  17. The Pros and Cons of Petroleum Agreements.

    ERIC Educational Resources Information Center

    Lipton, Charles J.

    1980-01-01

    A mineral agreements expert discusses the options open to tribes, from the most standard lease form to arrangements as yet untried by Indian Nations. Discussion covers 18 basic provisions for inclusion in agreements, tax considerations, and basic forms of petroleum agreements (leases, joint ventures, production sharing, and service contracts).…

  18. 5 CFR 370.105 - Written agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Written agreements. 370.105 Section 370... TECHNOLOGY EXCHANGE PROGRAM § 370.105 Written agreements. Before the detail begins, the agency and private sector organization must enter into a written agreement with the individual(s) detailed. The...

  19. 19 CFR 118.3 - Written agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Written agreement. 118.3 Section 118.3 Customs... CENTRALIZED EXAMINATION STATIONS General Provisions § 118.3 Written agreement. The applicant tentatively selected to operate a CES must sign a written agreement with Customs before commencing operations....

  20. 78 FR 35649 - Negotiated Service Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... Commission is noticing a recent Postal Service filing concerning an amendment to the 2013 Singapore Post... inbound market dominant services with Singapore Post Limited (2013 Agreement).\\1\\ The 2013 Agreement... Foreign Postal Operators 1 Negotiated Service Agreement (with Singapore Post Limited), June 4,...

  1. 29 CFR 102.62 - Election agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Election agreements. 102.62 Section 102.62 Labor... Act § 102.62 Election agreements. (a) Consent election agreements with final regional director determinations of post-election disputes. Where a petition has been duly filed, the employer and any...

  2. 29 CFR 102.62 - Election agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Election agreements. 102.62 Section 102.62 Labor... Act § 102.62 Election agreements. (a) Consent election agreements with final regional director determinations of post-election disputes. Where a petition has been duly filed, the employer and any...

  3. 10 CFR 607.620 - Cooperative agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Cooperative agreement. 607.620 Section 607.620 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 607.620 Cooperative agreement. Cooperative agreement means an award...

  4. 75 FR 3466 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the Secretary, Federal Maritime Commission,...

  5. 33 CFR 385.16 - Design agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Design agreements. 385.16 Section... Processes § 385.16 Design agreements. (a) The Corps of Engineers shall execute a design agreement with each non-Federal sponsor for the projects of the Plan prior to initiation of design activities with...

  6. 33 CFR 385.16 - Design agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Design agreements. 385.16 Section... Processes § 385.16 Design agreements. (a) The Corps of Engineers shall execute a design agreement with each non-Federal sponsor for the projects of the Plan prior to initiation of design activities with...

  7. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs:...

  8. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall...

  9. 24 CFR 964.335 - Grant agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Grant agreement. 964.335 Section... § 964.335 Grant agreement. (a) General. HUD will enter into a grant agreement with the recipients of a Family Investment Centers grant which defines the legal framework for the relationship between HUD and...

  10. 24 CFR 964.215 - Grant agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Grant agreement. 964.215 Section... Grant agreement. (a) General. HUD shall enter into a grant agreement with the recipient of a technical assistance grant which defines the legal framework for the relationship between HUD and a resident council...

  11. 76 FR 76411 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to the Secretary, Federal Maritime Commission,...

  12. 78 FR 14546 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the Secretary, Federal Maritime Commission,...

  13. 76 FR 54235 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the Secretary, Federal Maritime Commission,...

  14. 49 CFR 605.14 - Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.14 Agreement. Except as provided in § 605.11 no... entered into a written agreement that the applicant will not engage in school bus operations exclusively for the transportation of students and school personnel in competition with private school...

  15. 49 CFR 605.14 - Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.14 Agreement. Except as provided in § 605.11 no... entered into a written agreement that the applicant will not engage in school bus operations exclusively for the transportation of students and school personnel in competition with private school...

  16. 7 CFR 1775.13 - Grant agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Grant agreement. 1775.13 Section 1775.13 Agriculture... (CONTINUED) TECHNICAL ASSISTANCE GRANTS Grant Application Processing § 1775.13 Grant agreement. Applicants selected for funding will complete a grant agreement, RUS Guide 1775-1, which outlines the terms...

  17. 7 CFR 1775.13 - Grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Grant agreement. 1775.13 Section 1775.13 Agriculture... (CONTINUED) TECHNICAL ASSISTANCE GRANTS Grant Application Processing § 1775.13 Grant agreement. Applicants selected for funding will complete a grant agreement, RUS Guide 1775-1, which outlines the terms...

  18. 24 CFR 964.215 - Grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Grant agreement. 964.215 Section... Grant agreement. (a) General. HUD shall enter into a grant agreement with the recipient of a technical assistance grant which defines the legal framework for the relationship between HUD and a resident council...

  19. 24 CFR 964.215 - Grant agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Grant agreement. 964.215 Section... Grant agreement. (a) General. HUD shall enter into a grant agreement with the recipient of a technical assistance grant which defines the legal framework for the relationship between HUD and a resident council...

  20. 24 CFR 964.335 - Grant agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Grant agreement. 964.335 Section... § 964.335 Grant agreement. (a) General. HUD will enter into a grant agreement with the recipients of a Family Investment Centers grant which defines the legal framework for the relationship between HUD and...

  1. 24 CFR 964.335 - Grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Grant agreement. 964.335 Section... § 964.335 Grant agreement. (a) General. HUD will enter into a grant agreement with the recipients of a Family Investment Centers grant which defines the legal framework for the relationship between HUD and...

  2. 7 CFR 1776.10 - Grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Grant agreement. 1776.10 Section 1776.10 Agriculture... (CONTINUED) HOUSEHOLD WATER WELL SYSTEM GRANT PROGRAM HWWS Grants § 1776.10 Grant agreement. (a) RUS and the... grant award. RUS will furnish the form of grant agreement. No funds awarded under this part shall...

  3. 7 CFR 1776.10 - Grant agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Grant agreement. 1776.10 Section 1776.10 Agriculture... (CONTINUED) HOUSEHOLD WATER WELL SYSTEM GRANT PROGRAM HWWS Grants § 1776.10 Grant agreement. (a) RUS and the... grant award. RUS will furnish the form of grant agreement. No funds awarded under this part shall...

  4. 7 CFR 946.101 - Marketing agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Marketing agreement. 946.101 Section 946.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... WASHINGTON Rules and Regulations Definitions § 946.101 Marketing agreement. Marketing agreement...

  5. 7 CFR 966.111 - Marketing Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Marketing Agreement. 966.111 Section 966.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... and Regulations Definitions § 966.111 Marketing Agreement. Marketing Agreement means...

  6. 7 CFR 917.101 - Marketing agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Marketing agreement. 917.101 Section 917.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... CALIFORNIA Rules and Regulations Definitions § 917.101 Marketing agreement. Marketing agreement...

  7. 7 CFR 946.101 - Marketing agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Marketing agreement. 946.101 Section 946.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... WASHINGTON Rules and Regulations Definitions § 946.101 Marketing agreement. Marketing agreement...

  8. 7 CFR 917.101 - Marketing agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Marketing agreement. 917.101 Section 917.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... CALIFORNIA Rules and Regulations Definitions § 917.101 Marketing agreement. Marketing agreement...

  9. 7 CFR 966.111 - Marketing Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Marketing Agreement. 966.111 Section 966.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... and Regulations Definitions § 966.111 Marketing Agreement. Marketing Agreement means...

  10. 10 CFR 611.105 - Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Agreement. 611.105 Section 611.105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Direct Loan Program § 611.105 Agreement. (a) Only an Agreement executed by a duly authorized...

  11. 10 CFR 611.105 - Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Agreement. 611.105 Section 611.105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Direct Loan Program § 611.105 Agreement. (a) Only an Agreement executed by a duly authorized...

  12. 10 CFR 611.105 - Agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Agreement. 611.105 Section 611.105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Direct Loan Program § 611.105 Agreement. (a) Only an Agreement executed by a duly authorized...

  13. 10 CFR 611.105 - Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Agreement. 611.105 Section 611.105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Direct Loan Program § 611.105 Agreement. (a) Only an Agreement executed by a duly authorized...

  14. 10 CFR 611.105 - Agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Agreement. 611.105 Section 611.105 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM Direct Loan Program § 611.105 Agreement. (a) Only an Agreement executed by a duly authorized...

  15. 48 CFR 519.7010 - Agreement contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Agreement contents. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7010 Agreement contents. The contents of the Agreement must contain: (a) Names, addresses (including facsimile, e-mail, and...

  16. 49 CFR 605.14 - Agreement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... entered into a written agreement that the applicant will not engage in school bus operations exclusively for the transportation of students and school personnel in competition with private school bus... TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.14 Agreement. Except as provided in § 605.11...

  17. 49 CFR 605.14 - Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... entered into a written agreement that the applicant will not engage in school bus operations exclusively for the transportation of students and school personnel in competition with private school bus... TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.14 Agreement. Except as provided in § 605.11...

  18. 49 CFR 605.14 - Agreement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... entered into a written agreement that the applicant will not engage in school bus operations exclusively for the transportation of students and school personnel in competition with private school bus... TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.14 Agreement. Except as provided in § 605.11...

  19. 28 CFR 83.620 - Cooperative agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cooperative agreement. 83.620 Section 83.620 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GOVERNMENT-WIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (GRANTS) Definitions § 83.620 Cooperative agreement. Cooperative agreement means...

  20. 46 CFR Sec. 3 - Standby agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Standby agreements. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS FEDERAL PORT CONTROLLERS Sec. 3 Standby agreements. The Director, NSA, may negotiate the standard form of service agreement, specified...

  1. 77 FR 58140 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreements Filed The Commission hereby gives notice of the filing of the following agreements under the Shipping Act of 1984. Interested parties may submit comments on the agreements to the Secretary, Federal Maritime Commission,...

  2. 48 CFR 519.7010 - Agreement contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Agreement contents. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7010 Agreement contents. The contents of the Agreement must contain: (a) Names, addresses (including facsimile, e-mail, and...

  3. 78 FR 54646 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    .../America Cruise Ferries, Inc. Space Charter and Sailing Agreement. Parties: Crowley Latin America Services... America, Inc.; 6009 Bethlehem Road; Preston, MD 21655. Synopsis: The Amendment would add the U.S. Pacific.... Agreement No.: 012220. Title: Crowley/Seaboard Space Charter and Sailing Agreement. Parties: Crowley...

  4. 48 CFR 41.206 - Interagency agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CATEGORIES OF CONTRACTING ACQUISITION OF UTILITY SERVICES Acquiring Utility Services 41.206 Interagency agreements. Agencies shall use interagency agreements (e.g., consolidated purchase, joint use, or cross-service agreements) when acquiring utility service or facilities from other Government agencies and...

  5. 48 CFR 41.206 - Interagency agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CATEGORIES OF CONTRACTING ACQUISITION OF UTILITY SERVICES Acquiring Utility Services 41.206 Interagency agreements. Agencies shall use interagency agreements (e.g., consolidated purchase, joint use, or cross-service agreements) when acquiring utility service or facilities from other Government agencies and...

  6. 7 CFR 1599.5 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) After FAS approves an applicant's proposal, FAS will develop an agreement in consultation with the... certain countries that will be specified in the agreement. Any violation of this provision of the... transshipment of the donated commodities to a country not specified in the agreement for as long as such...

  7. 7 CFR 1499.5 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FAS approves an applicant's proposal, FAS will develop an agreement in consultation with the applicant... certain countries that will be specified in the agreement. Any violation of this provision of the... transshipment of the donated commodities to a country not specified in the agreement for as long as such...

  8. 7 CFR 966.111 - Marketing Agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Marketing Agreement. 966.111 Section 966.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... and Regulations Definitions § 966.111 Marketing Agreement. Marketing Agreement means...

  9. 7 CFR 966.111 - Marketing Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Marketing Agreement. 966.111 Section 966.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... and Regulations Definitions § 966.111 Marketing Agreement. Marketing Agreement means...

  10. 7 CFR 966.111 - Marketing Agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Marketing Agreement. 966.111 Section 966.111 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... and Regulations Definitions § 966.111 Marketing Agreement. Marketing Agreement means...

  11. 7 CFR 946.101 - Marketing agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Marketing agreement. 946.101 Section 946.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... WASHINGTON Rules and Regulations Definitions § 946.101 Marketing agreement. Marketing agreement...

  12. 7 CFR 946.101 - Marketing agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Marketing agreement. 946.101 Section 946.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... WASHINGTON Rules and Regulations Definitions § 946.101 Marketing agreement. Marketing agreement...

  13. 7 CFR 946.101 - Marketing agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Marketing agreement. 946.101 Section 946.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... WASHINGTON Rules and Regulations Definitions § 946.101 Marketing agreement. Marketing agreement...

  14. 77 FR 43599 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MARITIME COMMISSION Notice of Agreement Filed The Commission hereby gives notice of the filing of the following agreement under the Shipping Act of 1984. Interested parties may submit comments on the agreement to the Secretary, Federal Maritime Commission,...

  15. 26 CFR 601.802 - Cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... writing by mutual agreement between the Internal Revenue Service and the program sponsor at any time... program of an eligible applicant does not warrant award of an agreement, the Internal Revenue Service may... 26 Internal Revenue 20 2010-04-01 2010-04-01 false Cooperative agreements. 601.802 Section...

  16. 7 CFR 900.109 - Mediation agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Mediation agreement. 900.109 Section 900.109 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... Mediation agreement. An agreement arrived at by mediation shall not become effective until approved by...

  17. 46 CFR 298.38 - Partnership agreements and limited liability company agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Partnership agreements and limited liability company... FINANCING ASSISTANCE OBLIGATION GUARANTEES Documentation § 298.38 Partnership agreements and limited liability company agreements. Partnership and limited liability company agreements must be in form...

  18. 22 CFR 124.6 - Termination of manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Termination of manufacturing license agreements... Termination of manufacturing license agreements and technical assistance agreements. The U.S. party to a manufacturing license or a technical assistance agreement must inform the Directorate of Defense Trade...

  19. 22 CFR 124.6 - Termination of manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Termination of manufacturing license agreements... Termination of manufacturing license agreements and technical assistance agreements. The U.S. party to a manufacturing license or a technical assistance agreement must inform the Directorate of Defense Trade...

  20. 22 CFR 124.6 - Termination of manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Termination of manufacturing license agreements... Termination of manufacturing license agreements and technical assistance agreements. The U.S. party to a manufacturing license or a technical assistance agreement must inform the Directorate of Defense Trade...

  1. 22 CFR 124.6 - Termination of manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Termination of manufacturing license agreements... Termination of manufacturing license agreements and technical assistance agreements. The U.S. party to a manufacturing license or a technical assistance agreement must inform the Directorate of Defense Trade...

  2. An agreement coefficient for image comparison

    USGS Publications Warehouse

    Ji, L.; Gallo, K.

    2006-01-01

    Combination of datasets acquired from different sensor systems is necessary to construct a long time-series dataset for remotely sensed land-surface variables. Assessment of the agreement of the data derived from various sources is an important issue in understanding the data continuity through the time-series. Some traditional measures, including correlation coefficient, coefficient of determination, mean absolute error, and root mean square error, are not always optimal for evaluating the data agreement. For this reason, we developed a new agreement coefficient for comparing two different images. The agreement coefficient has the following properties: non-dimensional, bounded, symmetric, and distinguishable between systematic and unsystematic differences. The paper provides examples of agreement analyses for hypothetical data and actual remotely sensed data. The results demonstrate that the agreement coefficient does include the above properties, and therefore is a useful tool for image comparison. ?? 2006 American Society for Photogrammetry and Remote Sensing.

  3. 7 CFR 3431.18 - Service agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the Veterinary Medicine Loan Repayment Program § 3431.18 Service agreement. (a) The...

  4. 7 CFR 1720.9 - Guarantee Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the guarantee; (6) Limitation on acceleration of guaranteed bonds; (7) Calculation and manner of..., indemnification, multiple bond issues; (19) Governing law; (20) Notices; (21) Benefit of agreement; (22)...

  5. 7 CFR 1720.9 - Guarantee Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the guarantee; (6) Limitation on acceleration of guaranteed bonds; (7) Calculation and manner of..., indemnification, multiple bond issues; (19) Governing law; (20) Notices; (21) Benefit of agreement; (22)...

  6. 7 CFR 1720.9 - Guarantee Agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the guarantee; (6) Limitation on acceleration of guaranteed bonds; (7) Calculation and manner of..., indemnification, multiple bond issues; (19) Governing law; (20) Notices; (21) Benefit of agreement; (22)...

  7. 7 CFR 1720.9 - Guarantee Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the guarantee; (6) Limitation on acceleration of guaranteed bonds; (7) Calculation and manner of..., indemnification, multiple bond issues; (19) Governing law; (20) Notices; (21) Benefit of agreement; (22)...

  8. 7 CFR 1720.9 - Guarantee Agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the guarantee; (6) Limitation on acceleration of guaranteed bonds; (7) Calculation and manner of..., indemnification, multiple bond issues; (19) Governing law; (20) Notices; (21) Benefit of agreement; (22)...

  9. 76 FR 64944 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ...: Hamburg-Sud (``HSDG''); Alianca Navegacao e Logistica Ltda. e CIA (``Alianca''); Compania Sud Americana de...-010. Title: Maritime Credit Agreement. Parties: Alianca Navegacao e Logistica Ltda. & Cia.;...

  10. 48 CFR 49.109 - Settlement agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement agreements. 49.109 Section 49.109 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.109 Settlement agreements....

  11. 77 FR 33459 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    .... Title: Hoegh/Liberty Middle East Space Charter Agreement. Parties: Hoegh Autoliners AS and Liberty....S. East Coast Slot Charter Agreement. Parties: Hyundai Merchant Marine Co., Ltd., Mistsui O.S.K... to/from one another on an ``as needed, as available'' basis in the trade from ports on the U.S....

  12. 14 CFR 141.26 - Training agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Training agreements. 141.26 Section 141.26... OTHER CERTIFICATED AGENCIES PILOT SCHOOLS General § 141.26 Training agreements. A training center certificated under part 142 of this chapter may provide the training, testing, and checking for pilot...

  13. 14 CFR 142.33 - Training agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Training agreements. 142.33 Section 142.33... OTHER CERTIFICATED AGENCIES TRAINING CENTERS General § 142.33 Training agreements. A pilot school certificated under part 141 of this chapter may provide training, testing, and checking for a training...

  14. 23 CFR 710.307 - Project agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... acquisitions, including hardship acquisition and protective buying (see 23 CFR 710.503). The STD must prepare a project agreement in accordance with 23 CFR part 630, subpart C. The agreement shall be based on an..., donations, or other contributions applied to the project provided conditions in 23 U.S.C. 323 and 23 CFR...

  15. 23 CFR 710.307 - Project agreement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... acquisitions, including hardship acquisition and protective buying (see 23 CFR 710.503). The STD must prepare a project agreement in accordance with 23 CFR part 630, subpart C. The agreement shall be based on an..., donations, or other contributions applied to the project provided conditions in 23 U.S.C. 323 and 23 CFR...

  16. 23 CFR 710.307 - Project agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... acquisitions, including hardship acquisition and protective buying (see 23 CFR 710.503). The STD must prepare a project agreement in accordance with 23 CFR part 630, subpart C. The agreement shall be based on an..., donations, or other contributions applied to the project provided conditions in 23 U.S.C. 323 and 23 CFR...

  17. 23 CFR 710.307 - Project agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... acquisitions, including hardship acquisition and protective buying (see 23 CFR 710.503). The STD must prepare a project agreement in accordance with 23 CFR part 630, subpart C. The agreement shall be based on an..., donations, or other contributions applied to the project provided conditions in 23 U.S.C. 323 and 23 CFR...

  18. 32 CFR 241.5 - Written agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Written agreements. 241.5 Section 241.5 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PILOT PROGRAM FOR TEMPORARY EXCHANGE OF INFORMATION TECHNOLOGY PERSONNEL § 241.5 Written agreements....

  19. 32 CFR 241.5 - Written agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Written agreements. 241.5 Section 241.5 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS... Written agreements. (a) Before an assignment begins, the head of the DoD Component, private...

  20. 32 CFR 241.5 - Written agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Written agreements. 241.5 Section 241.5 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PILOT PROGRAM FOR TEMPORARY EXCHANGE OF INFORMATION TECHNOLOGY PERSONNEL § 241.5 Written agreements....

  1. 32 CFR 241.5 - Written agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Written agreements. 241.5 Section 241.5 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PILOT PROGRAM FOR TEMPORARY EXCHANGE OF INFORMATION TECHNOLOGY PERSONNEL § 241.5 Written agreements....

  2. 48 CFR 1819.7206 - Agreement contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Agreement contents. 1819.7206 Section 1819.7206 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... contents. Each mentor-protégé agreement will contain the following elements: (a) The name, address,...

  3. 48 CFR 1819.7206 - Agreement contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Agreement contents. 1819.7206 Section 1819.7206 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... contents. Each mentor-protégé agreement will contain the following elements: (a) The name, address,...

  4. 77 FR 32115 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    .... Title: CMA CGM/SSL Puerto Rico-Leeward Islands Space Charter Agreement. Parties: CMA CGM S.A. and Sea Star Line LLC. Filing Party: Wayne R. Rohde, Esquire; Cozen O'Connor; 1627 I Street NW., Suite 1100; Washington, DC 20006-4007. Synopsis: The agreement authorizes CMA to charter space to Sea Star in the...

  5. 39 CFR 963.12 - Settlement agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Settlement agreements. 963.12 Section 963.12 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO... rules do not preclude the disposition of any matter by agreement between the parties at any stage of...

  6. 39 CFR 963.12 - Settlement agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Settlement agreements. 963.12 Section 963.12 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO... rules do not preclude the disposition of any matter by agreement between the parties at any stage of...

  7. 7 CFR 1424.5 - Agreement process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... basis. (b) Sign-up each FY will be held for 30 calendar days beginning for: (1) FY 2003 on the date of... participate, an eligible producer must submit a signed agreement during the FY sign-up period. Agreements may... production estimate reports during each applicable FY sign-up period. Such reports must comply with the...

  8. Your EHR license agreement: critical issues.

    PubMed

    Shay, Daniel F

    2014-01-01

    This article discusses several key provisions and concepts in software license agreements for electronic health records. It offers insight into what physician practices can expect to find in their license agreements, as well as practical advice on beneficial provisions. The article examines contractual language relating to term and termination, technical specifications and support, and compliance with governmental programs. PMID:25241452

  9. 40 CFR 2.215 - Confidentiality agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Confidentiality of Business Information § 2.215 Confidentiality agreements. (a) No EPA officer, employee, contractor, or subcontractor shall enter into any agreement with any affected business to keep business..., contractor, or subcontractor shall promise any affected business that business information will be...

  10. 34 CFR 675.48 - Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Work-Colleges Program § 675.48 Agreement. To participate in the Work-Colleges program, an institution shall enter into an agreement with the Secretary. The... that it satisfies the definition of “work-college” in § 675.41(a); (c) Assure that it will match...

  11. 46 CFR 535.201 - Subject agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Subject agreements. 535.201 Section 535.201 Shipping FEDERAL MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Scope § 535.201...

  12. 7 CFR 1424.5 - Agreement process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Agreement process. 1424.5 Section 1424.5 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOENERGY PROGRAM § 1424.5 Agreement process. (a)...

  13. 7 CFR 1424.5 - Agreement process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Agreement process. 1424.5 Section 1424.5 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOENERGY PROGRAM § 1424.5 Agreement process. (a)...

  14. 7 CFR 1424.5 - Agreement process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Agreement process. 1424.5 Section 1424.5 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOENERGY PROGRAM § 1424.5 Agreement process. (a)...

  15. 7 CFR 1424.5 - Agreement process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Agreement process. 1424.5 Section 1424.5 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOENERGY PROGRAM § 1424.5 Agreement process. (a)...

  16. 26 CFR 601.802 - Cooperative agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... STATEMENT OF PROCEDURAL RULES Tax Counseling for the Elderly § 601.802 Cooperative agreements. (a) General. Tax Counseling for the Elderly programs will be administered by sponsor organizations under... agreements. If appropriations to implement the Tax Counseling for the Elderly program are received at a...

  17. 26 CFR 601.802 - Cooperative agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... STATEMENT OF PROCEDURAL RULES Tax Counseling for the Elderly § 601.802 Cooperative agreements. (a) General. Tax Counseling for the Elderly programs will be administered by sponsor organizations under... agreements. If appropriations to implement the Tax Counseling for the Elderly program are received at a...

  18. 26 CFR 601.802 - Cooperative agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... STATEMENT OF PROCEDURAL RULES Tax Counseling for the Elderly § 601.802 Cooperative agreements. (a) General. Tax Counseling for the Elderly programs will be administered by sponsor organizations under... agreements. If appropriations to implement the Tax Counseling for the Elderly program are received at a...

  19. 8 CFR 217.6 - Carrier agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Carrier agreements. 217.6 Section 217.6 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS VISA WAIVER PROGRAM § 217... may notify a carrier of the existence of a basis for termination of a carrier agreement under...

  20. 8 CFR 217.6 - Carrier agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 8 Aliens and Nationality 1 2013-01-01 2013-01-01 false Carrier agreements. 217.6 Section 217.6 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS VISA WAIVER PROGRAM § 217... may notify a carrier of the existence of a basis for termination of a carrier agreement under...

  1. 8 CFR 217.6 - Carrier agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 8 Aliens and Nationality 1 2012-01-01 2012-01-01 false Carrier agreements. 217.6 Section 217.6 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS VISA WAIVER PROGRAM § 217... may notify a carrier of the existence of a basis for termination of a carrier agreement under...

  2. 8 CFR 217.6 - Carrier agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Carrier agreements. 217.6 Section 217.6 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS VISA WAIVER PROGRAM § 217... may notify a carrier of the existence of a basis for termination of a carrier agreement under...

  3. 8 CFR 217.6 - Carrier agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Carrier agreements. 217.6 Section 217.6 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS VISA WAIVER PROGRAM § 217... may notify a carrier of the existence of a basis for termination of a carrier agreement under...

  4. 48 CFR 842.1203 - Processing agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Processing agreements. 842.1203 Section 842.1203 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT... submit all supporting agreements and documentation to the OGC for review as to legal sufficiency....

  5. 26 CFR 601.202 - Closing agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 20 2013-04-01 2013-04-01 false Closing agreements. 601.202 Section 601.202 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INTERNAL REVENUE PRACTICE STATEMENT OF PROCEDURAL RULES Rulings and Other Specific Matters § 601.202 Closing agreements. (a) General. (1) Under section 7121 of the...

  6. 26 CFR 601.202 - Closing agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Approval. (1) Closing agreements relating to alcohol, tobacco, and firearms, taxes in respect of any... approved by the Director, Bureau of Alcohol, Tobacco, and Firearms. (2) Closing agreements relating to... or accounts are not includable in gross income until maturity or termination, whichever...

  7. 26 CFR 601.202 - Closing agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Approval. (1) Closing agreements relating to alcohol, tobacco, and firearms, taxes in respect of any... approved by the Director, Bureau of Alcohol, Tobacco, and Firearms. (2) Closing agreements relating to... or accounts are not includable in gross income until maturity or termination, whichever...

  8. 26 CFR 601.202 - Closing agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Approval. (1) Closing agreements relating to alcohol, tobacco, and firearms, taxes in respect of any... approved by the Director, Bureau of Alcohol, Tobacco, and Firearms. (2) Closing agreements relating to... or accounts are not includable in gross income until maturity or termination, whichever...

  9. 39 CFR 963.12 - Settlement agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Settlement agreements. 963.12 Section 963.12 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO VIOLATIONS OF THE PANDERING ADVERTISEMENTS STATUTE, 39 U.S.C. 3008 § 963.12 Settlement agreements....

  10. 48 CFR 1819.7206 - Agreement contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Agreement contents. 1819.7206 Section 1819.7206 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... contents. Each mentor-protégé agreement will contain the following elements: (a) The name, address,...

  11. 76 FR 2114 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-12

    ... Integrated Shipping Services, Ltd. Filing Party: Eric C. Jeffrey, Esq.; Goodwin Procter LLP; 901 New York...; New York Container Terminal, Inc.; and Port Newark Container Terminal LLC. Filing Party: Carol N....gov . ] Agreement No.: 011743-006. Title: Global Transportation Network Agreement. Parties: APL...

  12. 5 CFR 537.107 - Service agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STUDENT LOANS § 537.107 Service agreements. (a) Before an employing agency makes any loan payments for an... period of service with the agency and to reimburse the agency for the student loan repayment benefit when... student loan repayment benefits in addition to those fixed in the agreement based on contingencies...

  13. 5 CFR 537.107 - Service agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STUDENT LOANS § 537.107 Service agreements. (a) Before an employing agency makes any loan payments for an... period of service with the agency and to reimburse the agency for the student loan repayment benefit when... student loan repayment benefits in addition to those fixed in the agreement based on contingencies...

  14. 5 CFR 537.107 - Service agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STUDENT LOANS § 537.107 Service agreements. (a) Before an employing agency makes any loan payments for an... period of service with the agency and to reimburse the agency for the student loan repayment benefit when... student loan repayment benefits in addition to those fixed in the agreement based on contingencies...

  15. 5 CFR 537.107 - Service agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STUDENT LOANS § 537.107 Service agreements. (a) Before an employing agency makes any loan payments for an... period of service with the agency and to reimburse the agency for the student loan repayment benefit when... student loan repayment benefits in addition to those fixed in the agreement based on contingencies...

  16. 5 CFR 537.107 - Service agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STUDENT LOANS § 537.107 Service agreements. (a) Before an employing agency makes any loan payments for an... period of service with the agency and to reimburse the agency for the student loan repayment benefit when... student loan repayment benefits in addition to those fixed in the agreement based on contingencies...

  17. Trade agreements on know-how discussed

    NASA Astrophysics Data System (ADS)

    Melnikov, A.

    1983-10-01

    Under the conditions of the present scientific and technical revolution the thirst for possessing advanced production experience and knowledge has led to a significant increase in the number of agreements on the transmission of know-how as compared with license agreements, whose objects are patented scientific and technical achievements. As a rule, the All-Union Litsenzintorg Association concludes agreements on the transmission of know-how in the USSR. A number of other foreign trade associations also conclude such agreements. In accordance with their charters operations are performed for the transmission of know-how, when the latter form an integral part of agreements on the export or import of goods based on the products list of these associations. An analysis of the terms of agreements on the transmission of know-how shows that the rights and duties of the parties to the agreement coincide in large measure with the rights and duties of the licensor and licensee according to the license agreement.

  18. 36 CFR 222.28 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management of Wild Free-Roaming Horses and Burros § 222.28 Agreements. The Chief, Forest Service, may enter into agreements as he deems necessary to further the protection, management, and control of wild free-roaming horses and burros....

  19. 36 CFR 222.68 - Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Management of Wild Free-Roaming Horses and Burros § 222.68 Agreements. The Chief, Forest Service, may enter into agreements as he deems necessary to further the protection, management, and control of wild free-roaming horses and burros....

  20. 36 CFR 222.28 - Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Management of Wild Free-Roaming Horses and Burros § 222.28 Agreements. The Chief, Forest Service, may enter into agreements as he deems necessary to further the protection, management, and control of wild free-roaming horses and burros....

  1. 36 CFR 222.28 - Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Management of Wild Free-Roaming Horses and Burros § 222.28 Agreements. The Chief, Forest Service, may enter into agreements as he deems necessary to further the protection, management, and control of wild free-roaming horses and burros....

  2. 36 CFR 222.68 - Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Management of Wild Free-Roaming Horses and Burros § 222.68 Agreements. The Chief, Forest Service, may enter into agreements as he deems necessary to further the protection, management, and control of wild free-roaming horses and burros....

  3. Measures of Agreement for Incompletely Ranked Data.

    ERIC Educational Resources Information Center

    Iachan, Ronaldo

    1984-01-01

    Measures of agreement for ordinal-scaled data are suggested that make use of the k categories with the highest ranks. The proposed measures are applied to the Self-Directed Search in order to evaluate its agreement with self-assessment (translation ability) or with the work environment (congruence). (Author)

  4. 46 CFR 390.5 - Agreement vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in the waterborne carriage of men, materials, goods or wares; and (v) Designated in the agreement as... water-borne carriage of men, materials, goods or wares between: (i) Two points in the United States; (ii... water-borne carriage of men, materials, goods or wares; and (v) Designated in the agreement as...

  5. 78 FR 21364 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... removes Hyundai Merchant Marine Co., Ltd from the agreement. Agreement No.: 012199. Title: NYK/Hanjin... Co., Ltd.; and Hyundai Merchant Marine Co., Ltd. Filing Party: Jacob K. Lee; NYK Line (North America... as one Party); Hapag-Lloyd AG; Hyundai Merchant Marine Co., Ltd.; Mitsui O.S.K. Lines, Ltd.;...

  6. 77 FR 48983 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ...-Lloyd AG; Hyundai Merchant Marine Co. Ltd.; Kawasaki Kisen Kaisha, Ltd.; Nippon Yusen Kaisha Line; Orient Overseas Container Line Limited; and Yangming Marine Transport Corp. Filing Party: David F. Smith... expedited review. Agreement No.: 201218. Title: Bi-State Marine Terminal Discussion Agreement....

  7. 23 CFR 710.307 - Project agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... acquisitions, including hardship acquisition and protective buying (see 23 CFR 710.503). The STD must prepare a project agreement in accordance with 23 CFR part 630, subpart C. The agreement shall be based on an..., donations, or other contributions applied to the project provided conditions in 23 U.S.C. 323 and 23 CFR...

  8. 32 CFR 536.63 - Settlement agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Settlement agreements. 536.63 Section 536.63 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY CLAIMS AND ACCOUNTS CLAIMS AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.63 Settlement agreements. (a)...

  9. 30 CFR 725.16 - Grant agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Grant agreement. 725.16 Section 725.16 Mineral... REGULATIONS REIMBURSEMENTS TO STATES § 725.16 Grant agreement. (a) If a Director or his authorized designee approves an agency's grant application, the Director or his authorized designee shall prepare a...

  10. 23 CFR 630.112 - Agreement provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... appendix A to 49 CFR part 29. (5) Lobbying certification. By signing the project agreement, the STD agrees... 49 CFR part 29, subpart F. In signing the project agreement, the State is providing the certification required in appendix C to 49 CFR part 29, unless the State provides an annual certification. (4)...

  11. 18 CFR 807.3 - Administrative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Administrative agreements. 807.3 Section 807.3 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION WATER WITHDRAWAL REGISTRATION § 807.3 Administrative agreements. The Commission may complete...

  12. 18 CFR 807.3 - Administrative agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Administrative agreements. 807.3 Section 807.3 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION WATER WITHDRAWAL REGISTRATION § 807.3 Administrative agreements. The Commission may complete...

  13. Your EHR license agreement: critical issues.

    PubMed

    Shay, Daniel F

    2014-01-01

    This article discusses several key provisions and concepts in software license agreements for electronic health records. It offers insight into what physician practices can expect to find in their license agreements, as well as practical advice on beneficial provisions. The article examines contractual language relating to term and termination, technical specifications and support, and compliance with governmental programs.

  14. 24 CFR 280.30 - Grant agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Grant agreement. 280.30 Section 280... DEVELOPMENT GRANT PROGRAMS NEHEMIAH HOUSING OPPORTUNITY GRANTS PROGRAM Program Operation § 280.30 Grant agreement. (a) General. The recipient's responsibilities under NHOP will be incorporated in a...

  15. 24 CFR 280.30 - Grant agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Grant agreement. 280.30 Section 280... DEVELOPMENT GRANT PROGRAMS NEHEMIAH HOUSING OPPORTUNITY GRANTS PROGRAM Program Operation § 280.30 Grant agreement. (a) General. The recipient's responsibilities under NHOP will be incorporated in a...

  16. 30 CFR 735.19 - Grant agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Grant agreement. 735.19 Section 735.19 Mineral... REGULATORY PROGRAMS FOR NON-FEDERAL AND NON-INDIAN LANDS GRANTS FOR PROGRAM DEVELOPMENT AND ADMINISTRATION AND ENFORCEMENT § 735.19 Grant agreement. (a) If the Director or his authorized designee approves...

  17. 7 CFR 1290.8 - Grant agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Grant agreements. 1290.8 Section 1290.8 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SPECIALTY CROP BLOCK GRANT PROGRAM § 1290.8 Grant agreements. (a) After review and approval of a grant application, AMS will enter into...

  18. 7 CFR 1291.8 - Grant agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Grant agreements. 1291.8 Section 1291.8 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SPECIALTY CROP BLOCK GRANT PROGRAM-FARM BILL § 1291.8 Grant agreements. (a) After approval of a grant application, AMS will enter into...

  19. 7 CFR 1291.8 - Grant agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Grant agreements. 1291.8 Section 1291.8 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SPECIALTY CROP BLOCK GRANT PROGRAM-FARM BILL § 1291.8 Grant agreements. (a) After approval of a grant application, AMS will enter into...

  20. 30 CFR 725.16 - Grant agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Grant agreement. 725.16 Section 725.16 Mineral... REGULATIONS REIMBURSEMENTS TO STATES § 725.16 Grant agreement. (a) If a Director or his authorized designee approves an agency's grant application, the Director or his authorized designee shall prepare a...

  1. 30 CFR 735.19 - Grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Grant agreement. 735.19 Section 735.19 Mineral... REGULATORY PROGRAMS FOR NON-FEDERAL AND NON-INDIAN LANDS GRANTS FOR PROGRAM DEVELOPMENT AND ADMINISTRATION AND ENFORCEMENT § 735.19 Grant agreement. (a) If the Director or his authorized designee approves...

  2. 7 CFR 1290.8 - Grant agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Grant agreements. 1290.8 Section 1290.8 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SPECIALTY CROP BLOCK GRANT PROGRAM § 1290.8 Grant agreements. (a) After review and approval of a grant application, AMS will enter into...

  3. 24 CFR 280.30 - Grant agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Grant agreement. 280.30 Section 280... DEVELOPMENT GRANT PROGRAMS NEHEMIAH HOUSING OPPORTUNITY GRANTS PROGRAM Program Operation § 280.30 Grant agreement. (a) General. The recipient's responsibilities under NHOP will be incorporated in a...

  4. 30 CFR 725.16 - Grant agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Grant agreement. 725.16 Section 725.16 Mineral... REGULATIONS REIMBURSEMENTS TO STATES § 725.16 Grant agreement. (a) If a Director or his authorized designee approves an agency's grant application, the Director or his authorized designee shall prepare a...

  5. 7 CFR 1291.8 - Grant agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Grant agreements. 1291.8 Section 1291.8 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SPECIALTY CROP BLOCK GRANT PROGRAM-FARM BILL § 1291.8 Grant agreements. (a) After approval of a grant application, AMS will enter into...

  6. 7 CFR 1290.8 - Grant agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Grant agreements. 1290.8 Section 1290.8 Agriculture... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SPECIALTY CROP BLOCK GRANT PROGRAM § 1290.8 Grant agreements. (a) After review and approval of a grant application, AMS will enter into...

  7. 48 CFR 1542.1203 - Processing agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Novation and Change of Name Agreements 1542.1203 Processing agreements. (a... required documentary evidence. (2) Verify the accuracy of the list of contracts through the Contract... to the Director, Policy, Training and Oversight Division, and to each affected contract office....

  8. 40 CFR 35.3010 - Delegation agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Delegation agreement. 35.3010 Section 35.3010 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE... by year for the term of the delegation agreement; (6) Identify an accounting system, acceptable...

  9. 40 CFR 35.3010 - Delegation agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Delegation agreement. 35.3010 Section 35.3010 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE... by year for the term of the delegation agreement; (6) Identify an accounting system, acceptable...

  10. 40 CFR 35.3010 - Delegation agreement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Delegation agreement. 35.3010 Section 35.3010 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE... by year for the term of the delegation agreement; (6) Identify an accounting system, acceptable...

  11. 26 CFR 601.202 - Closing agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 20 2014-04-01 2014-04-01 false Closing agreements. 601.202 Section 601.202 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INTERNAL REVENUE PRACTICE STATEMENT OF PROCEDURAL RULES Rulings and Other Specific Matters § 601.202 Closing agreements. (a) General. (1) Under section 7121 of the...

  12. 75 FR 34138 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... appears in the Federal Register. Copies of the agreements are available through the Commission's Web site.... Synopsis: The agreement authorizes K-Line to charter space to CSAV in the trade from Mexico to the U.S... parties to sell or exchange slots to one another in the trades between U.S. ports and ports in......

  13. 43 CFR 24.5 - International agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false International agreements. 24.5 Section 24... WILDLIFE POLICY: STATE-FEDERAL RELATIONSHIPS § 24.5 International agreements. (a) International conventions... shall be to recommend that the United States negotiate and accede to only those international...

  14. 13 CFR 147.620 - Cooperative agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Cooperative agreement. 147.620 Section 147.620 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (NONPROCUREMENT) Definitions § 147.620 Cooperative agreement....

  15. 47 CFR 73.1650 - International agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false International agreements. 73.1650 Section 73... BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1650 International agreements. (a) The... international obligations and undertakings of the United States. Accordingly, all provisions in this part 73...

  16. 47 CFR 73.1650 - International agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false International agreements. 73.1650 Section 73... BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1650 International agreements. (a) The... international obligations and undertakings of the United States. Accordingly, all provisions in this part 73...

  17. 43 CFR 24.5 - International agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true International agreements. 24.5 Section 24.5... WILDLIFE POLICY: STATE-FEDERAL RELATIONSHIPS § 24.5 International agreements. (a) International conventions... shall be to recommend that the United States negotiate and accede to only those international...

  18. 47 CFR 73.1650 - International agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false International agreements. 73.1650 Section 73... BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1650 International agreements. (a) The... international obligations and undertakings of the United States. Accordingly, all provisions in this part 73...

  19. 43 CFR 24.5 - International agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false International agreements. 24.5 Section 24... WILDLIFE POLICY: STATE-FEDERAL RELATIONSHIPS § 24.5 International agreements. (a) International conventions... shall be to recommend that the United States negotiate and accede to only those international...

  20. 47 CFR 73.1650 - International agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false International agreements. 73.1650 Section 73... BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1650 International agreements. (a) The... international obligations and undertakings of the United States. Accordingly, all provisions in this part 73...

  1. 43 CFR 24.5 - International agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false International agreements. 24.5 Section 24... WILDLIFE POLICY: STATE-FEDERAL RELATIONSHIPS § 24.5 International agreements. (a) International conventions... shall be to recommend that the United States negotiate and accede to only those international...

  2. 43 CFR 24.5 - International agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false International agreements. 24.5 Section 24... WILDLIFE POLICY: STATE-FEDERAL RELATIONSHIPS § 24.5 International agreements. (a) International conventions... shall be to recommend that the United States negotiate and accede to only those international...

  3. 48 CFR 1819.7206 - Agreement contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Agreement contents. 1819.7206 Section 1819.7206 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... contents. Each mentor-protégé agreement will contain the following elements: (a) The name, address,...

  4. 46 CFR 390.5 - Agreement vessels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Agreement vessels. 390.5 Section 390.5 Shipping MARITIME... interest in an eligible agreement vessel if the party has the right to use the vessel to generate income or a right to the proceeds or a portion of the proceeds from its use even if the party does not have...

  5. 12 CFR 1807.900 - Assistance agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Assistance agreement. 1807.900 Section 1807.900 Banks and Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY CAPITAL MAGNET FUND Terms and Conditions of Assistance § 1807.900 Assistance agreement. (a) Each Applicant...

  6. 12 CFR 1807.900 - Assistance agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 9 2012-01-01 2012-01-01 false Assistance agreement. 1807.900 Section 1807.900 Banks and Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY CAPITAL MAGNET FUND Terms and Conditions of Assistance § 1807.900 Assistance agreement. (a) Each Applicant...

  7. 12 CFR 1807.900 - Assistance agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 10 2014-01-01 2014-01-01 false Assistance agreement. 1807.900 Section 1807.900 Banks and Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY CAPITAL MAGNET FUND Terms and Conditions of Assistance § 1807.900 Assistance agreement. (a) Each...

  8. 12 CFR 1807.900 - Assistance agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 9 2013-01-01 2013-01-01 false Assistance agreement. 1807.900 Section 1807.900 Banks and Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY CAPITAL MAGNET FUND Terms and Conditions of Assistance § 1807.900 Assistance agreement. (a) Each Applicant...

  9. 24 CFR 583.400 - Grant agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Grant agreement. 583.400 Section 583.400 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.400 Grant agreement....

  10. 24 CFR 583.400 - Grant agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Grant agreement. 583.400 Section 583.400 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.400 Grant agreement....

  11. 24 CFR 583.400 - Grant agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Grant agreement. 583.400 Section 583.400 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.400 Grant agreement....

  12. 24 CFR 583.400 - Grant agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Grant agreement. 583.400 Section 583.400 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.400 Grant agreement....

  13. Agreement between Two Independent Groups of Raters

    ERIC Educational Resources Information Center

    Vanbelle, Sophie; Albert, Adelin

    2009-01-01

    We propose a coefficient of agreement to assess the degree of concordance between two independent groups of raters classifying items on a nominal scale. This coefficient, defined on a population-based model, extends the classical Cohen's kappa coefficient for quantifying agreement between two raters. Weighted and intraclass versions of the…

  14. 7 CFR 917.101 - Marketing agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Marketing agreement. 917.101 Section 917.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE FRESH PEARS AND PEACHES GROWN...

  15. 7 CFR 917.101 - Marketing agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Marketing agreement. 917.101 Section 917.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE FRESH PEARS AND PEACHES GROWN...

  16. 7 CFR 917.101 - Marketing agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Marketing agreement. 917.101 Section 917.101 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE FRESH PEARS AND PEACHES GROWN...

  17. 78 FR 33864 - Negotiated Service Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... From the Federal Register Online via the Government Publishing Office POSTAL REGULATORY COMMISSION Negotiated Service Agreement AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal Service filing concerning an amendment to the 2013 China Post Agreement....

  18. Cooperative monitoring of regional security agreements

    SciTech Connect

    Pregenzer, A.L.; Vannoni, M.; Biringer, K.L.

    1996-11-01

    This paper argues that cooperative monitoring plays a critical role in the implementation of regional security agreements and confidence building measures. A framework for developing cooperative monitoring options is proposed and several possibilities for relating bilateral and regional monitoring systems to international monitoring systems are discussed. Three bilateral or regional agreements are analyzed briefly to illustrate different possibilities. These examples illustrate that the relationship of regional or bilateral arms control or security agreements to international agreements depends on a number of factors: the overlap of provisions between regional and international agreements; the degree of interest in a regional agreement among the international community; efficiency in implementing the agreement; and numerous political considerations. Given the importance of regional security to the international community, regions should be encouraged to develop their own infrastructure for implementing regional arms control and other security agreements. A regional infrastructure need not preclude participation in an international regime. On the contrary, establishing regional institutions for arms control and nonproliferation could result in more proactive participation of regional parties in developing solutions for regional and international problems, thereby strengthening existing and future international regimes. Possible first steps for strengthening regional infrastructures are identified and potential technical requirements are discussed.

  19. 14 CFR 1274.207 - Extended agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Extended agreements. 1274.207 Section 1274.207 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH..., period of performance and funding levels; therefore, new proposals, certifications, and...

  20. 14 CFR 1274.207 - Extended agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Extended agreements. 1274.207 Section 1274.207 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH..., period of performance and funding levels; therefore, new proposals, certifications, and...

  1. 14 CFR 1274.207 - Extended agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Extended agreements. 1274.207 Section 1274.207 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH..., period of performance and funding levels; therefore, new proposals, certifications, and...

  2. 23 CFR 635.115 - Agreement estimate.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... submitted by the STD for each force account project (see 23 CFR part 635, subpart B) when the plans and... 23 Highways 1 2010-04-01 2010-04-01 false Agreement estimate. 635.115 Section 635.115 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.115 Agreement estimate. (a) Following the award...

  3. 48 CFR 1819.7206 - Agreement contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Agreement contents. 1819.7206 Section 1819.7206 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... contents. Each mentor-protégé agreement will contain the following elements: (a) The name, address,...

  4. 77 FR 27227 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-09

    ... Agreement. Parties: Crowley Latin America Services, LLC and Evergreen Line Joint Service Agreement. Filing... Between Port of Houston Authority and Cosco Container Lines Americas, Inc. Parties: Port of Houston Authority and Cosco Container Lines Americas, Inc. Filing Party: Linda Henry, Esq., Port of...

  5. 30 CFR 208.9 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Agreements. 208.9 Section 208.9 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE MANAGEMENT SALE OF FEDERAL ROYALTY OIL General Provisions § 208.9 Agreements. (a) A purchaser must submit to MMS two...

  6. Determination of Agreement Between Laboratory Instruments.

    PubMed

    Gray, Tonya E.; Pratt, Manley C.; Cusick, Patrick K.

    1999-03-01

    The present study was conducted to illustrate the utility of Bland-Altman plots for use by our laboratory staff and other non-statisticians in assessing the agreement between values measured by using two different laboratory instruments. A high degree of agreement reflects acceptable interchangeability of equipment and minimal effect on clinical decision-making. We have summarized literature that suggests that the regression line and correlation coefficient used with regression analysis, although commonly employed, are not appropriate first choices for evaluating agreement. Using the ABL 500 Radiometer and i-STAT Portable Chemistry Analyzer, we evaluated pH, PCO2, and TCO2. Bland-Altman plots were simple to produce, were not mathematics-intensive, and provided an easily interpreted, graphical answer to the question of agreement between instruments. For purposes of clinical decision-making, the ABL and i-STAT machines were found to be in good agreement for the tests evaluated.

  7. [Innovative medicines and market access agreements].

    PubMed

    Toumi, M; Zard, J; Duvillard, R; Jommi, C

    2013-09-01

    Market Access Agreements (MAA) for drugs have emerged in response to the need to control health expenditures, as well as to the uncertainty about the true benefit of a drug. It is possible to group MAA in two types of agreements: financial agreements and outcome-based agreements. MAA is a growing trend and is shifting towards conditional access. However, the willingness to use these contracts and their implementation differ across countries, and some are still resistant to put them in place. The MAA challenges to overcome encompass the complexity of the schemes, the administrative burden and the difficulty of evaluating MAA. It is likely that these agreements might experience further evolution in the future to become a faster pathway for therapeutic innovations, at a fair price.

  8. Cooperative monitoring of regional security agreements

    SciTech Connect

    Pregenzer, A.L.; Vannoni, M.; Biringer, K.L.

    1995-08-01

    This paper argues that cooperative monitoring plays a critical role in the implementation of regional security agreements and confidence building measures. A framework for developing cooperative monitoring options is proposed and several possibilities for relating bilateral and regional monitoring systems to international monitoring systems are discussed. Three bilateral or regional agreements are analyzed briefly to illustrate different possibilities: (1) the demilitarization of the Sinai region between Israel and Egypt in the 1970s; (2) the 1991 quadripartite agreement for monitoring nuclear facilities among Brazil, Argentina, The Argentine-Brazilian Agency for Accounting and Control of Nuclear Materials and the International Atomic Energy Agency; and (3) a bilateral Open Skies agreement between Hungary and Romania in 1991. These examples illustrate that the relationship of regional or bilateral arms control or security agreements to international agreements depends on a number of factors: the overlap of provisions between regional and international agreements; the degree of interest in a regional agreement among the international community; efficiency in implementing the agreement; and numerous political considerations.Given the importance of regional security to the international community, regions should be encouraged to develop their own infrastructure for implementing regional arms control and other security agreements. A regional infrastructure need not preclude participation in an international regime. On the contrary, establishing regional institutions for arms control and nonproliferation could result in more proactive participation of regional parties in developing solutions for regional and international problems, thereby strengthening existing and future international regimes. Possible first steps for strengthening regional infrastructures are identified and potential technical requirements are discussed.

  9. 22 CFR 124.8 - Clauses required both in manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Clauses required both in manufacturing license agreements and technical assistance agreements. 124.8 Section 124.8 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT AND OTHER DEFENSE SERVICES §...

  10. 22 CFR 124.7 - Information required in all manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Information required in all manufacturing license agreements and technical assistance agreements. 124.7 Section 124.7 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS AGREEMENTS, OFF-SHORE PROCUREMENT AND...

  11. 48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade...

  12. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false World Trade Organization... FOREIGN ACQUISITION Trade Agreements 225.403 World Trade Organization Government Procurement Agreement and Free Trade Agreements. (c) For acquisitions of supplies covered by the World Trade...

  13. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false World Trade Organization... FOREIGN ACQUISITION Trade Agreements 225.403 World Trade Organization Government Procurement Agreement and Free Trade Agreements. (c) For acquisitions of supplies covered by the World Trade...

  14. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false World Trade Organization... FOREIGN ACQUISITION Trade Agreements 225.403 World Trade Organization Government Procurement Agreement and Free Trade Agreements. (c) For acquisitions of supplies covered by the World Trade...

  15. 48 CFR 225.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false World Trade Organization... FOREIGN ACQUISITION Trade Agreements 225.403 World Trade Organization Government Procurement Agreement and Free Trade Agreements. (c) For acquisitions of supplies covered by the World Trade...

  16. 78 FR 78956 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... on vessels operated by one another in the trade from the U.S. East and Gulf Coasts to ports in the Caribbean, South America, Central America, Mediterranean, and Middle East. Agreement No.: 201212-001....

  17. 78 FR 59359 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ....; Tropical Shipping and Construction Company Limited; and Zim Integrated Shipping Services, Ltd. Filing Party... Company Tower, 555 West Fifth Street 46th Floor, Los Angeles, CA 90013. Synopsis: The agreement...

  18. Appendix G: Peer review nondisclosure agreement

    SciTech Connect

    None, None

    2009-01-18

    This peer review nondisclosure agreement should be signed by each reviewer prior to the program sending review materials if sensitive or proprietary information will be provided reviewers or discussed during the review, and to everyone attending a review.

  19. 77 FR 68121 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... trade between Puerto Rico and the Dominican Republic. Agreement No.: 012186. Title: Crowley/Priority Ro... trade between Puerto Rico and the Dominican Republic for cargo originating in Puerto Rico as well as...

  20. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect

    Not Available

    2010-06-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  1. 77 FR 65886 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Lines, Ltd. and Crowley Liner Services/Crowley Caribbean Services, LLC as parties to the agreement... amendment reflects the resignation of Bernuth Lines, Ltd. and Crowley Liner Services, Inc./Crowley...

  2. 24 CFR 700.140 - Participatory agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... accepting any of the services under the case plan. (b) Once the plan is approved by the PAC and the...

  3. 7 CFR 1944.259 - Participatory agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... accepting any of the services under the case plan. (b) Once the plan is approved by the PAC and the...

  4. 24 CFR 700.140 - Participatory agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... accepting any of the services under the case plan. (b) Once the plan is approved by the PAC and the...

  5. 7 CFR 1944.259 - Participatory agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... accepting any of the services under the case plan. (b) Once the plan is approved by the PAC and the...

  6. 32 CFR 1656.8 - Employment agreements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM ALTERNATIVE..., Selective Service and the employer shall enter into an employment agreement that specifies their respective duties and responsibilities under the Alternative Service Program. (b) Restrictions on Selective...

  7. 32 CFR 1656.8 - Employment agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM ALTERNATIVE..., Selective Service and the employer shall enter into an employment agreement that specifies their respective duties and responsibilities under the Alternative Service Program. (b) Restrictions on Selective...

  8. 32 CFR 1656.8 - Employment agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM ALTERNATIVE..., Selective Service and the employer shall enter into an employment agreement that specifies their respective duties and responsibilities under the Alternative Service Program. (b) Restrictions on Selective...

  9. 32 CFR 1656.8 - Employment agreements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM ALTERNATIVE..., Selective Service and the employer shall enter into an employment agreement that specifies their respective duties and responsibilities under the Alternative Service Program. (b) Restrictions on Selective...

  10. 32 CFR 1656.8 - Employment agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM ALTERNATIVE..., Selective Service and the employer shall enter into an employment agreement that specifies their respective duties and responsibilities under the Alternative Service Program. (b) Restrictions on Selective...

  11. 14 CFR 420.31 - Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Airmen prior to a launch and for closing of air routes during the launch window and other such measures... shall complete an agreement with the FAA Air Traffic Control (ATC) office having jurisdiction over...

  12. 77 FR 72349 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... & Logistic GMBH & Co. KG; Industrial Maritime Carriers LLC; Seaboard Marine, Ltd.; and West Coast Industrial... amendment removes BBC Chartering & Logistic GMBH & Co. KG as a party to the agreement. By Order of...

  13. 24 CFR 7.43 - Settlement agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and/or their designees; and (4) Otherwise comply with 29 CFR part 1614. (b) Any settlement agreement... Regard to Race, Color Religion, Sex, National Origin, Age, Disability or Reprisal Remedies,...

  14. 75 FR 12748 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ....: 012092. Title: MOL/``K'' Line Space Charter and Sailing Agreement. Parties: Kawasaki Kisen Kaisha, Ltd... exchange slots and to coordinate sailings in the trades between the U.S. Pacific Coast and Japan,...

  15. 77 FR 23248 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ....: 012164. Title: KL/WHS Space Charter and Sailing Agreement. Parties: Kawasaki Kisen Kaisha, Ltd. and Wan... Line and Wan Hai to charter space on their respective vessels, coordinate their sailings, and...

  16. 34 CFR 675.35 - Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Job Location and Development Program § 675.35 Agreement... institution uses Federal funds to contract with another institution, suitable performance standards will...

  17. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect

    Not Available

    2011-07-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  18. 77 FR 76482 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ...; Evergreen Line Joint Service Agreement; Hanjin Shipping Co., Ltd.; Hapag-Lloyd AG; Hyundai Merchant Marine... Overseas Container Line Limited; Yangming Marine Transport Corp.; and Zim Integrated Shipping Services,...

  19. 75 FR 51073 - Notice of Agreement Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ...; Evergreen Line Joint Service Agreement; Gold Star Line, Ltd.; Hanjin Shipping Co., Ltd.; Hyundai Merchant Marine Co. Ltd; Kawasaki Kisen Kaisha, Ltd.; MISC Berhad; Mitsui O.S.K. lines Ltd.; Nippon Yusen...

  20. 75 FR 78245 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... Shipping Container Lines Co. Ltd., China Shipping Container Lines (Hong Kong) Co. Ltd., and Compania Sud..., including China, Hong Kong, and Korea. Agreement No.: 012114. Title: POS/TSL Vessel Sharing...

  1. 24 CFR 7.43 - Settlement agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and/or their designees; and (4) Otherwise comply with 29 CFR part 1614. (b) Any settlement agreement... Regard to Race, Color Religion, Sex, National Origin, Age, Disability or Reprisal Remedies,...

  2. 24 CFR 7.43 - Settlement agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and/or their designees; and (4) Otherwise comply with 29 CFR part 1614. (b) Any settlement agreement... Regard to Race, Color Religion, Sex, National Origin, Age, Disability or Reprisal Remedies,...

  3. 24 CFR 7.43 - Settlement agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and/or their designees; and (4) Otherwise comply with 29 CFR part 1614. (b) Any settlement agreement... Regard to Race, Color Religion, Sex, National Origin, Age, Disability or Reprisal Remedies,...

  4. 24 CFR 7.43 - Settlement agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and/or their designees; and (4) Otherwise comply with 29 CFR part 1614. (b) Any settlement agreement... Regard to Race, Color Religion, Sex, National Origin, Age, Disability or Reprisal Remedies,...

  5. 78 FR 70300 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... agreement authorizes the parties to share vessels and engage in related cooperative activities in the trades between each of Asia, North Europe, and the Mediterranean on the one hand and the U.S. on the other...

  6. 78 FR 64940 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... agreement authorizes the parties to share vessels and engage in related cooperative activities in the trades between each of Asia, North Europe, and the Mediterranean on the one hand and the U.S. on the other...

  7. 45 CFR 1640.3 - Contractual agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF FEDERAL LAW TO LSC RECIPIENTS § 1640.3 Contractual agreement. As a condition of receiving LSC... respect to its LSC funds, it will be subject to the Federal laws listed in § 1640.2(a)(1). The...

  8. 42 CFR 460.154 - Enrollment agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Participant Enrollment and Disenrollment § 460.154 Enrollment agreement. If the...

  9. 75 FR 74732 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    .... Slot Charter Agreement. Parties: Hainan PO Shipping Co., Ltd. and T.S. Lines Ltd. Filing Party: Neal M. Mayer, Esq.; Hoppel, Mayer & Coleman; 1050 Connecticut Avenue, NW., Tenth Floor; Washington, DC...

  10. 42 CFR 460.154 - Enrollment agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Participant Enrollment and Disenrollment § 460.154 Enrollment agreement. If the...

  11. 42 CFR 460.154 - Enrollment agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Participant Enrollment and Disenrollment § 460.154 Enrollment agreement. If the...

  12. 42 CFR 460.154 - Enrollment agreement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Participant Enrollment and Disenrollment § 460.154 Enrollment agreement. If the...

  13. 78 FR 17234 - Negotiated Service Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... From the Federal Register Online via the Government Publishing Office POSTAL REGULATORY COMMISSION Negotiated Service Agreement AGENCY: Postal Regulatory Commission. ACTION: Notice SUMMARY: The Commission is noticing a recent Postal Service filing concerning an amendment to Discover Financial Services...

  14. 76 FR 28778 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Company Tower; 555 West Fifth Street, 46th Floor; Los Angeles, CA 90013. Synopsis: The amendment removes... coast and Guatemala and Honduras. Agreement No.: 012127. Title: Hoegh/Liberty Space Charter...

  15. 76 FR 41794 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Services Limited; and King Ocean Service de Venezuela, S.A. Filing Party: Wayne Rohde, Esq.; Cozen O'Connor... address of Hamburg Sud, and removes King Ocean Service de Venezuela, S.A. as a participant. Agreement...

  16. 34 CFR 675.35 - Agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Job Location and Development Program § 675.35 Agreement... to the Secretary an annual report on the use of the funds and an evaluation of the effectiveness...

  17. 34 CFR 675.35 - Agreement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Job Location and Development Program § 675.35 Agreement... to the Secretary an annual report on the use of the funds and an evaluation of the effectiveness...

  18. 34 CFR 675.35 - Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Job Location and Development Program § 675.35 Agreement... to the Secretary an annual report on the use of the funds and an evaluation of the effectiveness...

  19. 34 CFR 675.35 - Agreement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF EDUCATION FEDERAL WORK-STUDY PROGRAMS Job Location and Development Program § 675.35 Agreement... to the Secretary an annual report on the use of the funds and an evaluation of the effectiveness...

  20. 78 FR 68444 - Notice of Agreements Filed

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... European Continent-US East Coast Service Space Charter Agreement. Parties: MSC Mediterranean Shipping... the trade between the North West European Continent and the U.S. East Coast. Dated: November 8,...