Science.gov

Sample records for alabama power company

  1. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    SciTech Connect

    Crew, James F.; Johnson, Herbie N.

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  2. 78 FR 38022 - Alabama Power Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... Operation On June 5, 2008, the Alabama Power Company, licensee for the Martin Dam Hydroelectric Project... regulations thereunder. The Martin Dam Hydroelectric Project is located on Tallapoosa River, in Tallapoosa... hereby given that the licensee, Alabama Power Company, is authorized to continue operation of the...

  3. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric... of Historic Places at the Martin Dam Hydroelectric Project. The Programmatic Agreement, when...

  4. 78 FR 35015 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ...: Alabama Power Company requests Commission approval to grant River Country Campground a permit to use...), plus two watercraft on the end. River Country Campground operates an existing RV Campground on...

  5. 77 FR 37036 - Alabama Power Company; Notice of Revised Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ...-013--Alabama Holt Hydroelectric Project] Alabama Power Company; Notice of Revised Restricted Service... inclusion in, the National Register of Historic Places at the Holt Hydroelectric Project. The PA, when... established a restricted service list for the Holt Hydroelectric Project. On June 6, 2012, the Jena Band...

  6. 77 FR 12829 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    .... Description of Application: Alabama Power Company seeks approval to replace turbine units 1 and 4 at the Lay... Lay Development the licensee proposes to complete turbine refurbishment of the two turbines, stator... generation. However, since the units are generator-limited, the installed capacity at the Lay and...

  7. 76 FR 55378 - Alabama Power Company; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Notice of Proposed Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy Regulatory Commission's (Commission) Rules of...

  8. 78 FR 21924 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    .... Description of Application: Alabama Power Company seeks approval to replace the Unit 4 turbine at the Jordan Dam Project. Specifically, the licensee proposes the following work: complete turbine replacement, wicket gate system rehabilitation or replacement, gate stem bushing replacement, turbine and...

  9. 78 FR 30297 - Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission...

  10. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... Energy Regulatory Commission Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed... included in, or eligible for inclusion in, the National Register of Historic Places at the Martin Dam....13(e)). The Commission's responsibilities pursuant to section 106 for the Martin Dam...

  11. 75 FR 53295 - Alabama Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... Energy Regulatory Commission Alabama Power Company; Notice of Availability of Environmental Assessment August 24, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy... use of project lands and waters at the Coosa River Project (FERC No. 2146). An...

  12. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Alabama Power Company; Holt Hydroelectric Project; Notice of Revised... new license for the Holt Hydroelectric Project No. 2203. The programmatic agreement, when executed by... a ] restricted service list for the Holt Hydroelectric Project. On June 21, 2012, the Choctaw...

  13. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts... Rule 2010 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and...

  14. 78 FR 4844 - Alabama Power Company; Notice Rejecting Request for Rehearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... Tuscaloosa Counties, Alabama.\\1\\ The Smith Lake Improvement and Stakeholders Association (Lake Association... ] 61,230, at 61,745-46 (2006); Duke Power, 114 FERC ] 61,148, at P 1 (2006); Gustavus Electric Co., 111 FERC ] 61,424, at P 3 (2005); Symbiotic, L.L.C., 99 FERC ] 61,064, at 61,300 (2002); and PacifiCorp,...

  15. The power systems development facility at Wilsonville, Alabama

    SciTech Connect

    Longanbach, J.R.; Pinkston, E.

    1995-12-01

    A Power Systems Development Facility (PSDF) is being built at Southern Company Service`s Clean Coal Research Center at Wilsonville, Alabama. The facility will be used for component testing and system integration of hot filters under gasification and pressurized combustion conditions for advanced coal-based power generation systems. The PSDF combines several pilot-scale test facilities at a single site to reduce the overall capital and operating costs compared to individual stand-alone facilities. M.W. Kellogg`s transport reactor technology will provide either an oxidizing or a reducing gas for parametric testing of hot particulate control devices. Later, gas from the transport reactor will be used to power a fuel cell. Foster Wheeler`s advanced pressurized fluidized-bed combustion (APFBC) technology, in which coal is partially converted to a fuel gas in a carbonizer with the remaining char converted in a PFBC, will be studied. A low NOx multi-annular swirl burner, firing the carbonizer fuel gas and combustor flue gas to power a gas turbine, will be tested with the PFBC.

  16. 76 FR 29744 - Monongahela Power Company, West Penn Power Company, The Potomac Edison Company, PJM...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... Edison Company, PJM Interconnection, L.L.C.; Notice of Filing Take notice that on May 13, 2011, Monongahela Power Company, West Penn Power Company, The Potomac Edison Company (collectively, the...

  17. 77 FR 66607 - Sierra Pacific Power Company, Nevada Power Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sierra Pacific Power Company, Nevada Power Company; Notice of... Pacific Power Company and Nevada Power Company (Applicants) filed a petition for declaratory...

  18. 78 FR 58571 - Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic Electric Company... Power Company (Maine Yankee), Connecticut Yankee Atomic Power Company (Connecticut Yankee), and the Yankee Atomic Electric Company (Yankee Atomic) (together, ``licensees'' or ``the Yankee Companies'')...

  19. Superfund Record of Decision (EPA region 4): Mowbray Engineering Company, Greenville, Alabama, September 1986. Final report

    SciTech Connect

    Not Available

    1986-09-25

    The Mowbray Engineering Company (MEC) site consists of a 3-acre swamp located in Greenville, Butler County, Alabama. An aquifer underlying the site supplies 11,400 residents with potable water. Waste oils were dumped onto the ground behind the plant. Oil was also allowed to flow into a city storm sewer drain and ultimately into the swamp. Dumping and other discharges continued until the mid 1970s. MEC installed two underground storage tanks to collect oils for resale and prevent spills. PCBs were detected in swamp soils at 500 ppm, leading EPA to remove the top six inches of swamp soil and disposing the wastes in an approved offsite hazardous waste facility. The primary contaminants of concern are PCBs. Selected remedies were proposed and are included.

  20. 76 FR 36527 - Alabama Power Company (Alabama Power); Notice of Application Tendered for Filing With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Martin Dam Project consists of: (1) A concrete gravity dam and an earth dike section, totaling about 2...-long concrete gravity intake structure, (c) a 255-foot-long concrete gravity non-overflow section,...

  1. The Power Company Hot-Spot

    NASA Astrophysics Data System (ADS)

    Barresi, Joseph F.

    1984-03-01

    Just as your companies screen and monitor the market place to determine demand and the public's perception of product need, the power company is constantly faced with studying and forecasting the potential for load growth within it's franchised areas. This study and it's resultant forecast for growth has placed the power industry in a hot spot.

  2. 75 FR 14436 - Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Energy Regulatory Commission Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois Public Service Company, Ameren Energy Resources Company, LLC, AmerenEnergy Resources Generating Company; Notice of Filing March 18, 2010. Take notice that on March 15, 2010, Ameren...

  3. 78 FR 35017 - Prairie Power, Inc. v. Ameren Services Company, Ameren Illinois Company, Ameren Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Energy Regulatory Commission Prairie Power, Inc. v. Ameren Services Company, Ameren Illinois Company, Ameren Transmission Company of Illinois; Notice of Complaint Take notice that on May 31, 2013, pursuant to section 206 of the Federal Power Act (FPA), 16 USC 825(e) and Rule 206 of the Federal...

  4. 77 FR 10489 - Xcel Energy Services Inc., Northern States Power Company v. American Transmission Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Energy Regulatory Commission Xcel Energy Services Inc., Northern States Power Company v. American Transmission Company, LLC; Notice of Complaint Take notice that on February 14, 2012, pursuant to section 206 of the Federal Power Act and Rule 206 of the Rules of Practice and Procedure of the Federal...

  5. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy Florida, Inc., Florida Power...

  6. 75 FR 18201 - Wisconsin Electric Power Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wisconsin Electric Power Company; Notice of Filing April 2, 2010. Take notice that on March 26, 2010, Wisconsin Electric Power Company filed counterpart signature pages to...

  7. 75 FR 9591 - Florida Power & Light Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Florida Power & Light Company; Notice of Filing February 24, 2010. Take notice that on February 17, 2010, Florida Power & Light Company (FPL) filed a petition for...

  8. 75 FR 51987 - Birch Power Company and Sorenson Engineering; Birch Power Company and Sorenson Leasing L.L.C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... Sorenson Leasing L.L.C.; Notice of Application for Transfer of License, and Soliciting Comments and Motions... (transferors) and Birch Power Company and Sorenson Leasing, L.L.C. (transferees) filed an application for..., Birch Power Company, Sorenson Engineering, and Sorenson Leasing L.L.C., 5203 South 11th East,...

  9. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Energy Regulatory Commission Thunder Bay Power Company, Thunder Bay Power, LLC, et al.; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene Thunder Bay Power Company Project No. 2404-095 Thunder Bay Power, LLC Midwest Hydro, Inc Project Nos. 2348-035,...

  10. 78 FR 42556 - Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Plant Issuance of Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... COMMISSION Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Plant Issuance of Environmental..., 2011, with various implementation dates for each of the rule changes. Maine Yankee Atomic Power Company (MYAPC) is holder of Facility Operating License DPR-36 for the Maine Yankee Atomic Power Plant (MY)....

  11. 170. Credit SHS. Northern California Power Company substation, Bully Hill ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    170. Credit SHS. Northern California Power Company substation, Bully Hill Mine area. Note lack of vegetation, caused by nearby copper smelting works. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  12. Electric utility companies and geothermal power

    NASA Technical Reports Server (NTRS)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  13. 75 FR 9958 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company (the licensee), now doing business as Progress Energy...

  14. 77 FR 13156 - Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... COMMISSION Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company, the licensee, doing business as Progress Energy Carolinas Inc., is...) 50.46, ``Acceptance criteria for emergency core cooling systems for light- water nuclear...

  15. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Renewed Facility...

  16. Integrated Distribution Management System for Alabama Principal Investigator

    SciTech Connect

    Schatz, Joe

    2013-03-31

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables data access and enterprise application integration.

  17. 3. ELEVATIONS, ADDITION TO POWER HOUSE. United Engineering Company Ltd., ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. ELEVATIONS, ADDITION TO POWER HOUSE. United Engineering Company Ltd., Alameda Shipyard. John Hudspeth, architect, foot of Main Street, Alameda, California. Sheet 4. Plan no. 10,548. Scale 1/4 inch to the foot, elevations, and one inch to the foot, sections and details. April 30, 1945, last revised 6/19/45. pencil on vellum - United Engineering Company Shipyard, Boiler House, 2900 Main Street, Alameda, Alameda County, CA

  18. How Trees Help the Power Company!

    ERIC Educational Resources Information Center

    King, Rik

    1992-01-01

    Proposes the utilization of graph theory to solve optimization problems. Defines the notion of spanning trees and presents two algorithms to determine optimization of a spanning tree. Discusses an example to connect towns by power transmission lines at minimum cost. (MDH)

  19. Connecticut Power Company Settles with EPA for Transformer Spill

    EPA Pesticide Factsheets

    The Connecticut Light and Power Company has agreed to pay $47,000 to settle claims by the US Environmental Protection Agency that it violated federal regulations in its management of a transformer that spilled 50 gallons of oil containing PCBs at a locatio

  20. 75 FR 77919 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental... Progress Energy Carolinas, Inc., for operation of the Shearon Harris Nuclear Power Plant (HNP), Unit 1...: Regarding Shearon Harris Nuclear Power Plant, Unit 1--Final Report (NUREG-1437, Supplement 33).''...

  1. 77 FR 38790 - Noble Americas Gas & Power Corp., LNG Development Company, LLC, LNG Development Company, LLC (d/b...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Americas Gas & Power Corp., LNG Development Company, LLC, LNG Development Company, LLC (d/b/a Oregon LNG... Corp. authority to import/ export natural gas from/ to Canada/Mexico, and to import LNG from various international sources by vessel. 3099 05/31/12 12-43-NG LNG Development Order granting blanket Company,...

  2. 75 FR 1050 - Alabama Power Company; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... Project), which includes the Weiss, H. Neely Henry, Logan Martin, Lay, and Bouldin developments; the... affects less than 1 acre of Federal lands, the Lay development affects 133.5 acres of Federal lands,...

  3. 77 FR 8246 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Martin Dam Project consists of: (1) A 2,000-foot-long, 168- foot-high concrete gravity dam and an earth... gates, each measuring 30 feet wide by 16 feet high; (b) a 250- foot-long concrete gravity intake structure, (c) a 255-foot-long concrete gravity non-overflow section, and (d) an approximately 1,000-...

  4. 76 FR 30328 - Alabama Power Company; Notice of Application For Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... construction of sixteen camper lots at Bay Point Campground on Logan Martin Lake. The campground would occupy 4... the campground. l. Locations of the Application: A copy of the application is available for...

  5. 75 FR 5073 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ...) 257-1403. i. FERC Contact: Any questions regarding this notice should be directed to Isis Johnson, Telephone (202) 502-6346, and e-mail: isis.johnson@ferc.gov . j. Deadline for filing comments, motions...

  6. 78 FR 932 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ..., AL 35203-8180, (205) 257-1000, jpowers@southernco.com . i. FERC Contact: Jade Alvey, (202) 502-6864, jade.alvey@ferc.gov . j. Deadline for filing comments, motions to intervene, and protests: January...

  7. 78 FR 30298 - Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room... reproduction at the address in item (h) above. m. Individuals desiring to be included on the...

  8. 75 FR 76000 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ..., access channel, and landscaping. Existing facilities that would be re-built in place at their current dimensions include a floating fuel dock and two floating courtesy docks. Proposed new facilities include a... of the application is available for inspection and reproduction at the Commission's Public...

  9. 76 FR 9769 - Alabama Power Company; Notice of Application Accepted for Filing, and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Jessup, (202) 502-6779, Jeremy.Jessup@ferc.gov . j. Deadline for filing comments, motions to intervene... periods in which flows below the dam may be modified. l. Locations of the Application: A copy of the... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to...

  10. 78 FR 64486 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... of the Application: A copy of the application is available for inspection and reproduction at the... pending projects. A copy is also available for inspection and reproduction at the address in item...

  11. 78 FR 62007 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-11

    ... application is available for inspection and reproduction at the Commission's Public Reference Room, located at... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to...

  12. 76 FR 1145 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ...: Application Type: Request for drought-based temporary variance of the Martin Project rule curve and minimum... requesting a drought- based temporary variance to the Martin Project rule curve. The rule curve...

  13. 76 FR 70714 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ...: Request for drought-based temporary variance of the Martin Project rule curve and minimum flow releases at... requesting a drought- based temporary variance to the Martin Project rule curve. The rule curve...

  14. 75 FR 3942 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental Assessment...), for operation of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), located in New Hill, North... Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Shearon Harris Nuclear......

  15. Tampa Electric Company`s Polk Power Station Integrated Gasification Combined Cycle Project

    SciTech Connect

    Jenkins, S.D.; Shafer, J.R.

    1994-12-31

    Tampa Electric Company (TEC) is in the construction phase for the new Polk Power Station, Unit {number_sign}1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. The unit will utilize oxygen-blown entrained-flow coal gasification, along with combined cycle technology, to provide nominal net 26OMW of generation. As part of the environmental features of this process, the sulfur species in the coal will be recovered as a commercial grade sulfuric acid by-product. The sulfur will be removed from the synthesis gas utilizing a cold gas clean-up system (CGCU).

  16. 77 FR 21093 - Seminole Electric Cooperative, Inc. v. Florida Power & Light Company; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Seminole Electric Cooperative, Inc. v. Florida Power & Light Company; Notice... Cooperative, Inc. (Complainant) filed a complaint alleging that Florida Power & Light Company...

  17. 75 FR 62154 - Carolina Power & Light Company; Notice of Withdrawal of Application for Amendment to Renewed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company; Notice of Withdrawal of Application for Amendment to Renewed... request of the Carolina Power & Light Company (the licensee) to withdraw its application dated...

  18. 75 FR 18828 - Wisconsin Electric Power Company, Wisconsin Gas LLC, Wisconsin Public Service Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wisconsin Electric Power Company, Wisconsin Gas LLC, Wisconsin Public....206 (2009), Wisconsin Electric Power Company, Wisconsin Gas LLC, and Wisconsin Public...

  19. 76 FR 51065 - Florida Power & Light Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... COMMISSION Docket No. 50-335-LA; ASLBP No. 11-911-01-LA-BD01] Florida Power & Light Company; Establishment of... Power & Light Company (St. Lucie Plant, Unit 1) This proceeding involves a license amendment request by Florida Power & Light Company to increase, from 2,700 megawatts thermal to 3,020 megawatts thermal,...

  20. 75 FR 54400 - Florida Power and Light Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... COMMISSION Florida Power and Light Company; Establishment of Atomic Safety and Licensing Board Pursuant to... over the following proceeding: Florida Power & Light Company (Turkey Point Units 6 and 7) This...). Petitioners challenge the application filed by Florida Power & Light Company pursuant to Subpart C of 10...

  1. 76 FR 34105 - Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company, et al. (the licensee), is the holder of Facility Operating License... Carolina Power & Light Company an exemption from the requirements of 10 CFR 26.205(c) and (d) for...

  2. 76 FR 24062 - Florida Power and Light Company, St. Lucie, Unit Nos. 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... COMMISSION Florida Power and Light Company, St. Lucie, Unit Nos. 1 and 2; Exemption 1.0 Background Florida Power & Light Company, et al. (FPL, the licensee), is the holder of Facility Operating License Nos. DPR... Commission hereby grants Florida Power & Light Company an exemption from the requirements of 10 CFR...

  3. 76 FR 7840 - American Hydro Power Company; Notice of Termination of Exemption by Implied Surrender and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission American Hydro Power Company; Notice of Termination of Exemption by Implied...: American Hydro Power Company. e. Name and Location of Project: The Gilpin Falls Project is located on... Information: Mr. Richard J. Halloran, American Hydro Power Company, 771 E. Lancaster Ave., Suite...

  4. 75 FR 16094 - Upper Peninsula Power Company; North American Hydro Holdings, LLC; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... Energy Regulatory Commission Upper Peninsula Power Company; North American Hydro Holdings, LLC; Notice of... 17, 2010, Upper Peninsula Power Company (transferor) and North American Hydro Holdings, LLC.... Jensky, Upper Peninsula Power Company, 700 N Adams Street, Green Bay, WI 54307, phone (920) 433-2900....

  5. 76 FR 63917 - Ocean Renewable Power Company, LLC; Notice of Application Accepted for Filing, Soliciting Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... Federal Energy Regulatory Commission Ocean Renewable Power Company, LLC; Notice of Application Accepted.... d. Applicant: Ocean Renewable Power Company, LLC. e. Name of Project: Cobscook Bay Tidal Energy...)-828(c). h. Applicant Contact: Christopher R. Sauer, Ocean Renewable Power Company, LLC, 120...

  6. 78 FR 32385 - Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Energy Regulatory Commission Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC; Constellation NewEnergy, Inc.; Constellation Power Source Generation, Inc.; Criterion Power..., CER Generation II, LLC, Constellation Mystic Power, LLC, Constellation NewEnergy, Inc.,...

  7. 78 FR 46616 - Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Surry Power Station...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... the Emergency Plan, ``Conditions of licenses,'' for North Anna Power Station, Units 1 and 2 (NAPS... Power Company (the licensee), for operation of NAPS and Surry located in Louisa County, Virginia, and...), ``Conditions of licenses,'' for North Anna Power Station, Units 1 and 2 (NAPS), for Renewed Facility...

  8. 75 FR 16521 - Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... COMMISSION Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2; Exemption 1.0 Background The Virginia Electric and Power Company, (the licensee) is the holder of Facility Operating License Nos. DPR-32 and DPR-37, which authorize operation of the Surry Power Station, Unit Nos. 1 and...

  9. Full-scale evaluation of mercury control with sorbent injection and COHPAC at Alabama Power E.C. Gaston.

    PubMed

    Bustard, C Jean; Durham, Michael; Lindsey, Charles; Starns, Travis; Baldrey, Ken; Martin, Cameron; Schlager, Richard; Sjostrom, Sharon; Slye, Rick; Renninger, Scott; Monroe, Larry; Miller, Richard; Chang, Ramsay

    2002-08-01

    The overall objective of this project was to determine the cost and impacts of Hg control using sorbent injection into a Compact Hybrid Particulate Collector (COHPAC) at Alabama Power's Gaston Unit 3. This test is part of a program funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) to obtain the necessary information to assess the costs of controlling Hg from coal-fired utility plants that do not have scrubbers for SO2 control. The economics will be developed based on various levels of Hg control. Gaston Unit 3 was chosen for testing because COHPAC represents a cost-effective retrofit option for utilities with existing electrostatic precipitators (ESPs). COHPAC is an EPRI-patented concept that places a high air-to-cloth ratio baghouse downstream of an existing ESP to improve overall particulate collection efficiency. Activated carbons were injected upstream of COHPAC and downstream of the ESP to obtain performance and operational data. Results were very encouraging, with up to 90% removal of Hg for short operating periods using powdered activated carbon (PAC). During the long-term tests, an average Hg removal efficiency of 78% was measured. The PAC injection rate for the long-term tests was chosen to maintain COHPAC cleaning frequency at less than 1.5 pulses/bag/hr.

  10. Alabama Water Use, 2005

    USGS Publications Warehouse

    Hutson, Susan S.; Littlepage, Thomas M.; Harper, Michael J.; Tinney, James O.

    2009-01-01

    Water is one of Alabama's most precious natural resources. It is a vital component of human existence and essential to the overall quality of life. Wise stewardship of this valuable resource depends on a continuing assessment of water availability and water use. Population growth in many parts of the State has resulted in increased competition for available water resources. This competition includes offstream uses, such as residential, agricultural, and industrial, and instream uses for maintenance of species habitat and diversity, navigation, power generation, recreation, and water quality. Accurate water-use information is required for sound management decisions within this competitive framework and is necessary for a more comprehensive understanding of the link between water use, water supply, and overall water availability. A study of water use during 2005 was conducted by the U.S. Geological Survey (USGS), in cooperation with the Alabama Department of Economic and Community Affairs, Office of Water Resources, Water Management Branch (ADECA-OWR), to provide water-use data for local and State water managers. The results of the study about the amount of water used, how it was used, and where it was used in Alabama have been published in 'Estimated use of water in Alabama in 2005' by Hutson and others, 2009, and is accessible on the Web at http://pubs.usgs.gov/sir/2009/5163 and available upon request as a CD-ROM through USGS and ADECA-OWR.

  11. 76 FR 13177 - Public Utilities Commission of Nevada and Sierra Pacific Power Company v. Tuscarora Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Energy Regulatory Commission Public Utilities Commission of Nevada and Sierra Pacific Power Company v. Tuscarora Gas Transmission Company; Notice of Complaint Take notice that on February 28, 2011, pursuant to... and Sierra Pacific Power Company (Complainants) filed a formal complaint against Tuscarora...

  12. Design of investment management optimization system for power grid companies under new electricity reform

    NASA Astrophysics Data System (ADS)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  13. Tampa Electric Company Polk Power Station IGCC project: Project status

    SciTech Connect

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  14. 75 FR 53984 - Virginia Electric and Power Company North Anna Power Station, Unit Nos. 1 and 2 Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Anna Power Station, Unit Nos. 1 and 2 (NAPS), for Renewed Facility Operating License Nos. NPF-4 and NPF.... DPR-32 and DPR-37, issued to Virginia Electric and Power Company (the licensee), for operation of NAPS... Continuation of Construction and the Operation,'' for NAPS dated April 1973, and Surry dated May 1972 and...

  15. Fatal occupational injuries among electric power company workers.

    PubMed

    Loomis, D; Dufort, V; Kleckner, R C; Savitz, D A

    1999-03-01

    Surveillance data suggest high rates of electrocutions and fatal falls among workers in electric utility companies, who may be exposed to electric current, heights, flammable agents, and frequent motor vehicle travel. To characterize the occurrence of fatal injuries among electric utility workers, we studied workers in five electric power companies in the United States. A cohort of 127,129 men hired between 1950 and 1986 was followed through 1988. Injuries at work were identified through manual review of death certificates. The occurrence of occupational injuries was analyzed with directly adjusted rates and Poisson regression. The overall rate of fatal occupational injuries was 13.20 per 100,000 person-years (n = 192), with 76% due to electric current, homicide, and falls from heights. Deaths were concentrated in a few groups with elevated injury rates, notably linemen (rate ratio (RR) 3.33), electricians (RR 2.79), and painters (RR 3.27). Occupations requiring daily work on elevations or frequent, direct contact with energized electrical equipment experienced markedly higher rates of fatal injury from falls and electrocutions with rate ratios of 21.8 (95% confidence interval (CI) 11.4-41.5) and 16.7 (95% CI 6.6-42.6), respectively, independent of worker age and seniority. Although fatal injury rates in this industry have declined in recent decades, significant numbers of deaths still occur. Based on the premise that all injuries are preventable, a need for continued vigilance and efforts at prevention is indicated.

  16. Duke Power Company's development of a biofouling monitoring program

    SciTech Connect

    Derwort, J.E.; Gnilka, A. )

    1991-11-01

    Biofouling programs at Duke Power Company (DPC) can be traced to the invasion of the Catawba River system by Corbicula in 1968. Raw water systems at Plant Allen, a coal-fired station on Lake Wylie, became heavily infested by clams during the 1970s. Development of programs was accelerated as a result of the shutdown of Catawba nuclear station (CNS) on lake Wylie in 1986 due to clam infestations in safety-related systems, increased biofouling problems at McGuire nuclear station (MNS) on lake Norman, and by the issuance of the US Nuclear Regulatory Commission's (NRC's) Generic Letter (GL) 89-13 (issued in 1989). Historical data were reviewed to identify pertinent questions, and a refined, multifaceted Corbicula monitoring plan was developed. This plan was implemented at CNS and MNS in 1989.

  17. 76 FR 34692 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC; v. New York...

  18. 76 FR 36910 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC. v. New York...

  19. 76 FR 36914 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC, v. New York...

  20. 75 FR 13142 - Florida Power and Light Company; Turkey Point, Units 3 and 4; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... COMMISSION Florida Power and Light Company; Turkey Point, Units 3 and 4; Exemption 1.0 Background Florida Power and Light Company (FPL, the licensee), is the holder of Facility Operating License Nos. DPR-31 and... of light water nuclear power reactors need to provide adequate margins of safety during any...

  1. 76 FR 68512 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Renewed Facility Operating License... cooling systems for light- water nuclear power reactors,'' paragraph (a)(1)(i) provides requirements...

  2. 77 FR 58823 - Interstate Power and Light Company v. ITC Midwest, LLC, Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Interstate Power and Light Company v. ITC Midwest, LLC, Notice of Complaint... Power Act, 16 U.S.C. 824(e), Interstate Power and Light Company (Complainant) filed a formal...

  3. 75 FR 12533 - The Power Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... December 21, 2009, The Power Company, Inc. filed an application, pursuant to Section 4(f) of the Federal Power Act, proposing to study the feasibility of the Damariscotta River Hydrokinetic Tidal Energy... Energy Regulatory Commission The Power Company, Inc.; Notice of Preliminary Permit Application...

  4. 77 FR 25163 - Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... Energy Regulatory Commission Stoughton Water Power Company; Notice of Preliminary Permit Application..., 2011, the Stoughton Water Power Company filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Stoughton Dam Water...

  5. 77 FR 14775 - Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Energy Regulatory Commission Stoughton Water Power Company; Notice of Preliminary Permit Application..., 2011, the Stoughton Water Power Company filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Stoughton Dam Water...

  6. 75 FR 22772 - Cargill Power Markets, LLC, Complainant v. Public Service Company of New Mexico, Respondent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Energy Regulatory Commission Cargill Power Markets, LLC, Complainant v. Public Service Company of New..., 18 CFR 385.206 (2009), and section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2006), Cargill Power Markets, LLC (Complainant) filed a formal complaint against Public Service Company of New...

  7. Alabama successes spur interest in eastern Gulf

    SciTech Connect

    Redden, J.

    1985-11-01

    The shallow waters of the eastern fringe of the Gulf of Mexico are becoming a world-class offshore gas play. Spurred by the success ratio offshore Alabama, the water off Mississippi and Florida are drawing intense interest as oil companies attempt to extend the prolific Norphlet formation. Sitting at the heart of the recent interest in the eastern Gulf are the state and federal waters off Alabama. Exploration and drilling activity in the area are discussed.

  8. 77 FR 40914 - In the Matter of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... benchmarking results; d. Performed a gap analysis and revised the FFD collector training material; e. Briefed... the CO, Indiana Michigan Power Company will develop a lessons-learned presentation of the events that.... Indiana Michigan Power Company will present these lessons learned within 180 days to all available...

  9. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... COMMISSION FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...Energy Nuclear Operating Company (FENOC, the licensee), for operation of the Perry Nuclear Power Plant... Manager, Plant Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear...

  10. 77 FR 51071 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment and... Indiana Michigan Power Company (the licensee), for operation of Donald C. Cook Nuclear Plant, Unit 2 (CNP... not change normal plant operating conditions (i.e., no changes are expected in the fuel...

  11. 76 FR 77563 - Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  12. 75 FR 16871 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Facility Operating...

  13. 76 FR 802 - Florida Power and Light Company, Turkey Point, Units 3 and 4; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Florida Power and Light Company, Turkey Point, Units 3 and 4; Exemption 1.0 Background Florida Power and Light Company (FPL, the licensee) is the holder of Facility Operating License Nos. DPR-31...

  14. 77 FR 26793 - Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  15. 75 FR 14635 - FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... COMMISSION FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental Assessment...Energy Nuclear Operating Company (FENOC, the licensee), for operation of the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS), located in Ottawa County, Ohio. Therefore, as required by 10 CFR 51.21, the...

  16. 77 FR 1674 - Ocean Renewable Power Company Maine, LLC; Notice of Availability of Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal... Energy Regulatory Commission Ocean Renewable Power Company Maine, LLC; Notice of Availability of Environmental Assessment for the Proposed Cobscook Bay Tidal Energy Project In accordance with the...

  17. 75 FR 45107 - Idaho Power Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... July 23, 2010. On June 26, 2008, Idaho Power Company, licensee for the Swan Falls Hydroelectric Project... regulations thereunder. The Swan Falls Hydroelectric Project is on the Snake River in Ada and Owyhee counties..., notice is hereby given that Idaho Power Company is authorized to continue operation of the Swan...

  18. 76 FR 71014 - Idaho Power Company, IDACORP Energy, L.P., IDACORP, Inc.; Notice of Petition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Idaho Power Company, IDACORP Energy, L.P., IDACORP, Inc.; Notice of Petition Take notice that on September 9, 2011, Idaho Power Company, IDACORP Energy, L.P., and IDACORP,...

  19. 77 FR 5791 - Ocean Renewable Power Company Maine, LLC; Notice of Staff Participation in Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ocean Renewable Power Company Maine, LLC; Notice of Staff Participation in... representatives from Ocean Renewable Power Company Maine, LLC at the Federal Energy Regulatory...

  20. 76 FR 18750 - Ocean Renewable Power Company, LLC; Notice of Change in Docket Number

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ocean Renewable Power Company, LLC; Notice of Change in Docket Number On July 24, 2009, Ocean Renewable Power Company, LLC (ORPC) filed a draft hydrokinetic pilot...

  1. 77 FR 73634 - Wisconsin Electric Power Company; Notice of Application Accepted for Filing, Ready for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...-095] Wisconsin Electric Power Company; Notice of Application Accepted for Filing, Ready for..., Wisconsin Electric Power Company, 800 Industrial Park Drive, Iron Mountain, MI 49801, (906) 779-4099. i... License. b. Project No.: 11831-095. c. Date Filed: October 24, 2012. d. Applicant: Wisconsin...

  2. 77 FR 40608 - Wisconsin Electric Power Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Energy Regulatory Commission Wisconsin Electric Power Company; Notice of Petition for Declaratory Order...) Rules of Practice and Procedure, 18 CFR 381.302 and 385.207, Wisconsin Electric Power Company (Wisconsin Electric) submitted a petition requesting the Commission to issue a declaratory order approving:...

  3. 76 FR 41530 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval of... Facility Operating License No. DPR-61 for the Haddam Neck Plant, currently held by Connecticut Yankee Atomic Power Company (CYAPCO), as owner and licensed operator of the Haddam Neck Plant. According to...

  4. 78 FR 57373 - Appalachian Power Company; Notice of Application To Increase Water Withdraw and Construct Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... Energy Regulatory Commission Appalachian Power Company; Notice of Application To Increase Water Withdraw and Construct Water Withdraw Facilty Pursuant to License Article 202 and Soliciting Comments, Motions... Filed: July 31, 2013. d. Applicant: Appalachian Power Company (licensee). e. Name of Project:...

  5. 75 FR 71744 - Toshiba Corporation Power Systems Company Notice of Receipt and Availability of an Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... COMMISSION Toshiba Corporation Power Systems Company Notice of Receipt and Availability of an Application for Renewal of the U.S. Advanced Boiling Water Reactor Design Certification On November 2, 2010, Toshiba Corporation Power Systems Company (Toshiba) filed with the U.S. Nuclear Regulatory Commission (NRC,...

  6. 78 FR 26401 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding.... On June 20, 2012, Connecticut Yankee Atomic Power Company (CYAPCO) submitted a letter, ``Request for... structure in place prior to the issuance of the EP Final Rule and, therefore, does not propose any...

  7. 78 FR 45984 - Yankee Atomic Electric Company, Yankee Nuclear Power Station

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... COMMISSION Yankee Atomic Electric Company, Yankee Nuclear Power Station AGENCY: Nuclear Regulatory Commission... Atomic Electric Company (YAEC) is the holder of Possession-Only License DPR-3 for the Yankee Nuclear Power Station (YNPS) facility. The license, issued pursuant to the Atomic Energy Act of 1954, as...

  8. 76 FR 42122 - Ocean Renewable Power Company, LLC; Notice Concluding Pre-Filing Process and Approving Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... Energy Regulatory Commission Ocean Renewable Power Company, LLC; Notice Concluding Pre-Filing Process and... By: Ocean Renewable Power Company, LLC. e. Name of Project: Cobscook Bay Tidal Energy Project. f... R. Sauer, Ocean Renewable Power Company, LLC, 120 Exchange Street, Suite 508, Portland, Maine...

  9. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... COMMISSION FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating License No... compliance date (Reference: June 4, 2009, letter from R. W. Borchardt, NRC, to M. S. Fertel, Nuclear...

  10. 75 FR 16523 - FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... COMMISSION FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating License... M.S. Fertel, Nuclear Energy Institute). The licensee's request for an exemption is...

  11. 75 FR 80549 - FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating...

  12. 75 FR 38147 - FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating...

  13. 78 FR 29391 - Luminant Generation Company, LLC; Combined License Application for Comanche Peak Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Luminant Generation Company, LLC; Combined License Application for Comanche Peak Nuclear Power Plant, Units 3 and 4; Exemption 1.0 Background Luminant Generation Company, LLC. (Luminant) submitted...

  14. 75 FR 33653 - Connecticut Yankee Atomic Power Company; Notice of Consideration of Issuance of Amendment to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ... COMMISSION Connecticut Yankee Atomic Power Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards; Consideration Determination, and Opportunity... hazards consideration. Under the Commission's regulations in Title 10 of the Code of Federal...

  15. 75 FR 7471 - Chandra Coffee and Rabun Boatworks, Complainants v. Georgia Power Company, Respondent; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Chandra Coffee and Rabun Boatworks, Complainants v. Georgia Power Company... January 8, 2010, Chandra Coffee and Rabun Boatworks (Complainants) filed with the Federal...

  16. 75 FR 32449 - Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Appalachian Power Company; Notice of Application for Amendment of License... Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the...

  17. 77 FR 33004 - Exelon Generation Company, LLC; Clinton Power Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-04

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Exelon Generation Company, LLC; Clinton Power Station, Unit 1 AGENCY: Nuclear Regulatory... request for partial site release to Facility Operating License No. NPF-62 issued to Exelon...

  18. 75 FR 6224 - Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is...

  19. 76 FR 20970 - Appalachian Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Appalachian Power Company; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy...

  20. 75 FR 54621 - Lockhart Power Company-South Carolina Pacolet Hydroelectric Project; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... Energy Regulatory Commission Lockhart Power Company--South Carolina Pacolet Hydroelectric Project; Notice... eligible for inclusion in, the National Register of Historic Places at the Pacolet Hydroelectric Project... ). The Commission's responsibilities pursuant to section 106 for the Pacolet Hydroelectric Project...

  1. 76 FR 41532 - Yankee Atomic Electric Company, Yankee Nuclear Power Station (Yankee-Rowe); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... COMMISSION Yankee Atomic Electric Company, Yankee Nuclear Power Station (Yankee-Rowe); Notice of... indirect transfer of the Facility Operating License No. DPR-3 for the Yankee Nuclear Power Station (Yankee... Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR part 2....

  2. Bank Powers. Activities of Securities, Subsidiaries of Bank Holding Companies

    DTIC Science & Technology

    1990-03-01

    securities subsidiaries of bank holding companies. ,JUL, ?• 199 These subsidiaries, authorized by the Federal Reserve Board, are com- monly called Section 20...members of the Federal Reserve System to be affiliatcd with firms that are not principally engaged in securities activi- ti-e generally forbidden to banks...for certain specified securities, mainly government swcurities. member banks of the Federal Reserve System are prohibited under the 1933 Glass

  3. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of securities of power supply companies from section 9(a)(2) of the Act. (a) An electric utility... securities, and any obligation by such electric utility company to provide funds to the power supply company... securities of the power supply company are owned by one or more electric utility companies to which the...

  4. 77 FR 26541 - Alabama Power Company; Notice of Application for Amendment of License Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ...,000 cfs from Jordan Dam July 1 through March 31 and release a continuous base flow of 4,000 cfs for 18... June the base and pulse flows are stepped down in daily increments to the continuous flow of 2,000 cfs... Dam no less than a continuous flow of 2,000 cubic feet per second (cfs), beginning immediately...

  5. 78 FR 71595 - Appalachian Power Company; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ...: October 10, 2013. d. Applicant: Appalachian Power Company (licensee). e. Name of Project: Smith Mountain Pumped Storage Project. f. Location: The Smith Mountain Project is located on the Roanoke River in... lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Mr. Frank...

  6. 77 FR 134 - In the Matter of Yankee Atomic Electric Company; Northeast Utilities; NSTAR (Yankee Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... COMMISSION In the Matter of Yankee Atomic Electric Company; Northeast Utilities; NSTAR (Yankee Nuclear Power Station); Order Approving Application Regarding Proposed Merger I Yankee Atomic Electric Company (Yankee... (together, the ] ``application''), Yankee Atomic notified the Nuclear Regulatory Commission (NRC or...

  7. 77 FR 26321 - Virginia Electric and Power Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... caused by an earthquake centered in Mineral, Virginia, approximately 10 miles from North Anna 1 and 2... tripped on ``negative flux rate'' rather than on loss of offsite power. (2) Subsequent to the earthquake... motion experienced at, and damage sustained to, North Anna 1 and 2, due to the earthquake of August...

  8. Car companies look to generate power from waste heat

    NASA Astrophysics Data System (ADS)

    Schirber, Michael

    2008-04-01

    You might think that the steam engine is an outdated technology that had its heyday centuries ago, but in fact steam is once again a hot topic with vehicle manufacturers. Indeed, the next generation of hybrid cars and trucks may incorporate some form of steam power. Honda, for example, has just released details of a new prototype hybrid car that recharges its battery using a steam engine that exploits waste heat from the exhaust pipe.

  9. 76 FR 77024 - In the Matter of Carolina Power & Light Company North Carolina Eastern, Municipal Power Agency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... Company (CP&L, the licensee) and North Carolina Eastern Municipal Power Agency are the owners of Brunswick... and an ISFSI located in Brunswick County, North Carolina. The facility operating licenses authorize CP... facility operating licenses for Brunswick, to the extent held by CP&L. The proposed indirect transfer...

  10. Site Characterization for CO{sub 2} Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama

    SciTech Connect

    Clark, Peter; Pashin, Jack; Carlson, Eric; Goodliffe, Andrew; McIntyre-Redden, Marcella; Mann, Steven; Thompson, Mason

    2012-08-31

    Coal-fired power plants produce large quantities of carbon dioxide. In order to mitigate the greenhouse gas emissions from these power plants, it is necessary to separate and store the carbon dioxide. Saline formations provide a potential sink for carbon dioxide and delineating the capacity of the various known saline formations is a key part of building a storage inventory. As part of this effort, a project was undertaken to access the storage capacity of saline reservoirs in the Black Warrior Basin of Alabama. This basin has been a productive oil and gas reservoir that is well characterized to the west of the two major coal-fired power plants that are north of Birmingham. The saline zones were thought to extend as far east as the Sequatchie Anticline which is just east of the power plants. There is no oil or gas production in the area surrounding the power plants so little is known about the formations in that area. A geologic characterization well was drilled on the Gorgas Power Plant site, which is the farthest west of two power plants in the area. The well was planned to be drilled to approximately 8,000 feet, but drilling was halted at approximately 5,000 feet when a prolific freshwater zone was penetrated. During drilling, a complete set of cores through all of the potential injection zones and the seals above these zones were acquired. A complete set of openhole logs were run along with a vertical seismic profile (VSP). Before drilling started two approximately perpendicular seismic lines were run and later correlated with the VSP. While the zones that were expected were found at approximately the predicted depths, the zones that are typically saline through the reservoir were found to be saturated with a light crude oil. Unfortunately, both the porosity and permeability of these zones were small enough that no meaningful hydrocarbon production would be expected even with carbon dioxide flooding. iv While this part of the basin was found to be unsuitable

  11. Large CFB power plant design and operating experience: Texas-New Mexico Power Company 150 MWe (net) CFB power plant

    SciTech Connect

    Riley, K.; Cleve, K.; Tanca, M.

    1995-12-31

    The first unit of the TNP One CFB power plant was successfully put on line by Texas-New Mexico Power Company (TNP) in Robertson County, Texas, US in 1990. Unit 2 came on line one year later. This grassroots plant fires Texas lignite. The two identical CFB units were each designed for 150 MWe net electrical generation. The units have operated at 155 MWe net for extended periods of time without modifications. The boilers have additional capacity but are limited by the balance of plant. The TNP One plant was awarded the Power Plant of the Year Award by Power magazine in 1991 advancing CFB technology in large generating facilities. The plant was designed for maximum fuel flexibility with guaranteed full load operation on either Texas lignite, western coal or natural gas. The plant has fired the following fuels, to date: lignite (base fuel), natural gas (0--100% with lignite), delayed petroleum coke (0--100% with lignite), plant generated waste oils (small amounts), oil filter fluff (small amounts) and a waste product of pelletized reflective tape. Future testing is planned to test burn shredded tires. While firing all fuels, the plant could attain full load and meet all environmentally permitted emissions without any boiler modifications or compromises in boiler efficiency. This high flexibility of the plant can be attributed to the two large fluidized bed heat exchangers (FBHEs) for steam temperature and combustor temperature control. The facility is a mine mouth operation burning the local Texas lignite. The delayed petroleum cokes fired originated from various supply sources from the Texas/Louisiana area.

  12. 75 FR 63209 - Indiana Michigan Power Company; Notice of Consideration of Issuance of Amendment to Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... COMMISSION Indiana Michigan Power Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a... consideration. Under the Commission's regulations in 10 CFR 50.92, this means that operation of the facility...

  13. 78 FR 17392 - Idaho Power Company; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Idaho Power Company; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy...

  14. 75 FR 52523 - Bowersock Mills and Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Bowersock Mills and Power Company; Notice of Availability of Environmental... Energy Regulatory Commission (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47879),...

  15. 77 FR 65417 - Northern States Power Company (Prairie Island Nuclear Generating Plant Independent Spent Fuel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company (Prairie Island Nuclear Generating Plant Independent Spent Fuel...(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the above-captioned Prairie...

  16. 77 FR 55878 - Florida Power & Light Company; Receipt of Request for Action

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION [Docket Nos.: 50-250, 50-251, 50-335, and 50-389; NRC-2012-0210; License Nos.: DPR-31, DPR-41, DPR-67, and NPF-16] Florida Power & Light Company; Receipt of Request for Action Notice is hereby...

  17. 75 FR 28597 - Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... 23, 2010, supplemented May 7, 2010. d. Applicant: Georgia Power Company. ] e. Name of Project: North... e-mail address: christopher.yeakel@ferc.gov . j. Deadline for filing comments and or motions: June...://www.ferc.gov ) under the ``e-filing'' link. The Commission strongly encourages electronic filings....

  18. 75 FR 34776 - Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... COMMISSION Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4; Environmental... licensee), for operation of the Turkey Point Nuclear Generating Plant, Units 3 and 4, located in Florida... consider approval of an exemption for Turkey Point, Units 3 and 4, from certain requirements of 10 CFR...

  19. METRO-APEX Volume 11.1: Industrialists' Manual No. 1, Shear Power Company. Revised.

    ERIC Educational Resources Information Center

    University of Southern California, Los Angeles. COMEX Research Project.

    The Industrialist's Manual No. 1 (Shear Power Company) is one of a set of twenty-one manuals used in METRO-APEX 1974, a computerized college and professional level, computer-supported, role-play, simulation exercise of a community with "normal" problems. Stress is placed on environmental quality considerations. APEX 1974 is an expansion…

  20. Installation of an ENERGEO Biomass Power Plant at a Lumber Company

    DTIC Science & Technology

    1995-06-01

    NUMBERS N/A 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) ENERGEO, Incorporated 28531 La Maravilla Laguna Niguel, California 92656 U.S. EPA...Washington, DC INSTALLATION OF AN ENERGEO BIOMASS POWER PLANT AT A LUMBER COMPANY Charles F. Sanders ENERGEO, Incorporated 28531 La Maravilla

  1. 76 FR 51016 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    .... Applicant: Idaho Power Company of Boise, Idaho. e. Name of Project: Twin Falls Hydroelectric Project. f... licensee requests that the definition of ``peak viewing times'' in article 410 of the Twin Falls Project... average 300 cubic feet per second (cfs) over Twin Falls from 8 a.m. to 30 minutes after sunset each day,...

  2. 75 FR 12230 - Idaho Power Company, Idaho; Notice of Availability of Draft Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Impact Statement for the Swan Falls Project March 5, 2010. In accordance with the National Environmental... has reviewed Idaho Power Company's application for license for the Swan Falls Project (FERC Project No... the Swan Falls Project. The draft EIS documents the views of governmental agencies, non-...

  3. 75 FR 53964 - Idaho Power Company, Idaho; Notice of Availability of Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Impact Statement for the Swan Falls Project August 26, 2010. In accordance with the National... Office of Energy Projects has reviewed Idaho Power Company's application for license for the Swan Falls... alternatives for relicensing the Swan Falls Project. The final EIS documents the views of governmental...

  4. 78 FR 64290 - Intermountain Power Agency v. Union Pacific Railroad Company-Oral Argument

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ... Surface Transportation Board Intermountain Power Agency v. Union Pacific Railroad Company-- Oral Argument The Surface Transportation Board will hold oral argument on Thursday, November 14, 2013, at 9:30 a.m... facilities at Lynndyl, Utah. The oral argument will be open for public observation, but only counsel for...

  5. 78 FR 41057 - Notice of Availability of Environmental Assessment; Wisconsin Electric Power Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Availability of Environmental Assessment; Wisconsin Electric Power Company In accordance with the National Environmental Policy Act of 1969 and the Federal Energy...

  6. 77 FR 47618 - Algonquin Power Company; Notice of Application Accepted for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ..., 2012. d. Applicant: Algonquin Power Company. e. Name of Project: Lower Beaver Falls Hydroelectric Project. f. Location: The proposed project is located on the Beaver River in Lewis County, New York. g.... Description of Request: The licensee proposes to amend the license for the Lower Beaver Falls...

  7. 77 FR 58591 - Northern States Power Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... COMMISSION Northern States Power Company; Establishment of Atomic Safety and Licensing Board Pursuant to....105, 2.300, 2.313, 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board... Commission to E. Roy Hawkens, Chief Administrative Judge, Atomic Safety and Licensing Board Panel (Sept....

  8. 76 FR 52356 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC or the Commission)...

  9. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  10. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of... that could be affected by issuance of a new license for the Bartletts Ferry Hydroelectric Project No... list for the Bartletts Ferry Hydroelectric Project. On June 14, 2012, the Kialegee Tribal...

  11. 78 FR 76903 - Lockhart Power Company, Inc.; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ... From the Federal Register Online via the Government Publishing Office ] Vol. 78 Thursday, No. 244 December 19, 2013 Part II Department of Energy Federal Energy Regulatory Commission Lockhart Power Company, Inc.; Notice of Availability of Draft Environmental Assessment; Notice #0;#0;Federal Register / Vol. 78 , No. 244 / Thursday, December 19, 2013...

  12. 78 FR 61946 - Hillman Power Company, L.L.C.; Notice of Initiation of Proceeding And Refund Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hillman Power Company, L.L.C.; Notice of Initiation of Proceeding And Refund..., L.L.C. Hillman Power Company, L.L.C., 144 FERC ] 61,245 (2013). The refund effective date in...

  13. 77 FR 71588 - Alaska Electric Light and Power Company, et al.; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Energy Regulatory Commission Alaska Electric Light and Power Company, et al.; Notice of Petition for Declaratory Order ] Alaska Electric Light and Power Company....... Docket Nos. EL13-24-000; Project No. 2307... Commission's (Commission) Rules of Practice and Procedure 18 CFR 385.207(a)(2), Alaska Electric Light...

  14. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Renewed Facility...

  15. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Facility Operating License No....

  16. 75 FR 4426 - Florida Power and Light Company; Turkey Point Nuclear Generating Units 3 and 4; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... COMMISSION Florida Power and Light Company; Turkey Point Nuclear Generating Units 3 and 4; Environmental... to Florida Power and Light Company (the licensee), for operation of the Turkey Point Units 3 and 4... the beltline region of the Turkey Point Units 3 and 4 reactor pressure vessels. Environmental...

  17. 78 FR 28836 - Vulcan/BN Geothermal Power Company; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Vulcan/BN Geothermal Power Company; Supplemental Notice That Initial Market... in the above-referenced proceeding of Vulcan/BN Geothermal Power Company's application for...

  18. 78 FR 28835 - Salton Sea Power Generation Company; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Salton Sea Power Generation Company; Supplemental Notice That Initial Market... in the above-referenced proceeding of Salton Sea Power Generation Company's application for...

  19. 75 FR 71107 - Upper Peninsula Power Company; UP Hydro; Notice of Application for Transfer of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Energy Regulatory Commission Upper Peninsula Power Company; UP Hydro; Notice of Application for Transfer..., Upper Peninsula Power Company (transferor) and UP Hydro (transferee) filed an application for transfer.... Alsberg, North American Hydro Holdings, Inc., 116 State Street, Neshkoro, WI 54960, (920) 293-4628 Ext....

  20. 77 FR 133 - In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... COMMISSION In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck Plant); Order Approving Application Regarding Proposed Merger I Connecticut Yankee Atomic Power Company (Connecticut Yankee or the licensee) is the holder of Facility Operating License No. DPR-61, which...

  1. 75 FR 57535 - Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... COMMISSION Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To... application dated April 2, 2009, as supplemented March 30, 2010, Connecticut Yankee Atomic Power Company... No. 203 complies with the standards and requirements of the Atomic Energy Act of 1954, as...

  2. 75 FR 80545 - Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... COMMISSION Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental..., ``Physical protection of plants and materials,'' for Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for operation of the H. B. Robinson Steam Electric...

  3. 75 FR 61467 - Garland Power Company; Supplemental Notice that Initial Market-Based Rate Filing Includes Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Garland Power Company; Supplemental Notice that Initial Market- Based Rate... notice in the above-referenced proceeding of Garland Power Company's application for market-based...

  4. Tampa Electric Company, Polk Power Station Unit No. 1, preliminary public design report

    SciTech Connect

    1994-06-01

    This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE`s project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

  5. 76 FR 39445 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2... Company--Minnesota (licensee), the ] operator of Prairie Island Nuclear Generating Plant, Units 1 and 2... 39, Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2,'' issued May 2011,...

  6. 78 FR 41805 - In the Matter of FirstEnergy Nuclear Operating Company; Beaver Valley Power Station; Independent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... COMMISSION In the Matter of FirstEnergy Nuclear Operating Company; Beaver Valley Power Station; Independent Spent Fuel Storage Installation; Order Modifying License (Effective Immediately) AGENCY: Nuclear... fingerprinting for unescorted access to FirstEnergy Nuclear Operating Company. FOR FURTHER INFORMATION CONTACT:...

  7. 75 FR 3946 - License Nos. DPR-42 and DPR-60; Northern States Power Company; Prairie Island Nuclear Generating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... Nuclear Reactor Regulation. BILLING CODE 7590-01-P ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION License Nos. DPR-42 and DPR-60; Northern States Power Company; Prairie Island Nuclear...

  8. Corporate Power and Social Policy: The Political Economy of the Transnational Tobacco Companies

    PubMed Central

    Holden, Chris; Lee, Kelley

    2009-01-01

    Drawing on published tobacco document research and related sources, this article applies Farnsworth and Holden's conceptual framework for the analysis of corporate power and corporate involvement in social policy (2006) to the transnational tobacco companies (TTCs). An assessment is made of TTCs' structural power, the impact upon their structural position of tobacco control (TC) policies, and their use of agency power. The analysis suggests that, as a result of the growth of TC policies from the 1950s onwards, TTCs have had to rely on political agency to pursue their interests and attempt to reassert their structural position. The collapse of the Eastern bloc and the liberalisation of East Asian economies presented new structural opportunities for TTCs in the 1980s and 1990s, but the development of globally coordinated TC policies facilitated by the World Health Organisation's Framework Convention on Tobacco Control has the potential to constrain these. PMID:20228951

  9. 76 FR 54259 - Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339, North Anna Power Station...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Company (the licensee), for operation of the North Anna Power Station (NAPS) Unit Nos. 1 and 2, located in...'' for NAPS dated April 1973, and Surry dated May 1972 and June 1972, respectively, as...

  10. Biodosimetry of restoration workers for the Tokyo Electric Power Company (TEPCO) Fukushima Daiichi nuclear power station accident.

    PubMed

    Suto, Yumiko; Hirai, Momoki; Akiyama, Miho; Kobashi, Gen; Itokawa, Masanari; Akashi, Makoto; Sugiura, Nobuyuki

    2013-10-01

    The biological dose of nuclear workers engaged in emergency response tasks at Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Station was estimated in the present study. As the national core center for radiation emergency medical preparedness in Japan, the National Institute of Radiological Sciences (NIRS) received all individuals who were suspected of being overexposed to acute radiation. In the course of health examinations at NIRS, biological dosimetry was performed by the dicentric chromosome assay (DCA). Twelve individuals were examined from 21 March-1 July 2011. The results indicated that the estimated exposure doses for all individuals were lower than 30 mGy, with the mean value of about 101 mGy. These results by DCA were in accordance with those obtained by physical dosimetry based on personal dosimeter recording assessment. The results corroborate the fact that no acute radiation syndrome was observed among the workers examined.

  11. Homonegativity among Alabama Counselors

    ERIC Educational Resources Information Center

    Satcher, Jamie; Leggett, Mark

    2006-01-01

    Members of the Alabama Counseling Association were surveyed to examine the extent to which they demonstrate homonegativity (prejudicial attitudes toward homosexuality). The majority of the counselors did not appear to approach homosexuality from traditional prejudices, although almost one-third believed homosexuality to be immoral. The counselors…

  12. Alabama and SREB

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2009

    2009-01-01

    The Southern Regional Education Board (SREB) is a nonprofit organization that works collaboratively with Alabama and 15 other member states to improve education at every level--from pre-K to postdoctoral study--through many effective programs and initiatives. SREB's "Challenge to Lead Goals for Education", which call for the region to…

  13. Academic Standards in Alabama

    ERIC Educational Resources Information Center

    A+ Education Partnership, 2014

    2014-01-01

    Education policymakers and educators in Alabama are committed to improving the state's public education system to ensure that students gain the knowledge and skills they need to graduate from high school ready for real life. The state is on the path to implementing higher academic standards--the College and Career Ready Standards--which lay a…

  14. Alabama's Decree of Difficulty.

    ERIC Educational Resources Information Center

    Evelyn, Jamilah

    1998-01-01

    Nearly 30 years after the official end of de jure segregation, Alabama is struggling to level educational opportunities for both black and white citizens. Critics say this goal will be difficult to reach unless the state hires and retains more black faculty. Only recently, because of a court decree, are state black institutions getting equal…

  15. 75 FR 39285 - Virginia Electric and Power Company: North Anna Power Station, Unit No. 1 Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Power Station, Unit 1 (NAPS Unit 1), located in Louisa County, Virginia. Therefore, as required by 10... the Proposed Action The proposed action would exempt NAPS Unit 1 from the requirement that the reactor... potential pressurized and unpressurized leakage sites in the RCP lube oil systems. Specifically, NAPS Unit...

  16. 78 FR 50410 - Birch Power Company; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13102-003--Alabama; Demopolis Lock and Dam Hydroelectric... 2010 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18...

  17. 75 FR 13801 - Exelon Generation Company, LLC; Zion Nuclear Power Station, Units 1 and 2; Order Extending the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY... Company, LLC; Zion Nuclear Power Station, Units 1 and 2; Order Extending the Effectiveness of the Approval... holder of licenses DPR-39 and DPR-48, for the Zion Nuclear Power Station, Units 1 and 2 (Zion...

  18. 78 FR 16490 - Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued Project Operation On February 18, 2011, the Jersey Central Power and Light...

  19. 75 FR 6071 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and 3... Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and...

  20. 76 FR 25378 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and... Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located...

  1. 75 FR 58445 - Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... COMMISSION Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental... operation of Peach Bottom Atomic Power Station (PBAPS), Unit Nos. 2 and 3, located in York and Lancaster... PBAPS, Unit Nos. 2 and 3, demonstrates the feasibility and reliability of the identified OMAs....

  2. 77 FR 16026 - Cargill Power Markets, LLC v. Public Service Company of New Mexico; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Cargill Power Markets, LLC v. Public Service Company of New Mexico; Notice... Cargill Power Markets, LLC submitted a compliance filing to modify the standard of review in...

  3. High SO{sub 2} removal efficiency testing: Results of DBA and sodium formate additive tests at Southwestern Electric Power company`s Pirkey Station

    SciTech Connect

    1996-05-30

    Tests were conducted at Southwestern Electric Power Company`s (SWEPCo) Henry W. Pirkey Station wet limestone flue gas desulfurization (FGD) system to evaluate options for achieving high sulfur dioxide removal efficiency. The Pirkey FGD system includes four absorber modules, each with dual slurry recirculation loops and with a perforated plate tray in the upper loop. The options tested involved the use of dibasic acid (DBA) or sodium formate as a performance additive. The effectiveness of other potential options was simulated with the Electric Power Research Institute`s (EPRI) FGD PRocess Integration and Simulation Model (FGDPRISM) after it was calibrated to the system. An economic analysis was done to determine the cost effectiveness of the high-efficiency options. Results are-summarized below.

  4. Sharing the opportunity cost among power companies to support hydropower-to-environment water transfers

    NASA Astrophysics Data System (ADS)

    Tilmant, Amaury; Marques, Guilherme

    2016-04-01

    Among the environmental impacts caused by dams, the alteration of flow regimes is one of the most critical to river ecosystems given its influence in long river reaches and its continuous pattern. Provided it is technically feasible, the reoperation of hydroelectric reservoir systems can, in principle, mitigate the impacts on degraded freshwater ecosystems by recovering some of the natural flow regime. The typical approach to implement hydropower-to-environment water transfers focuses on the reoperation of the dam located immediately upstream of the environmentally sensitive area, meaning that only one power station will bear the brunt of the benefits forgone for the power sector. By ignoring the contribution of upstream infrastructures to the alteration of the flow regime, the opportunity cost associated with the restoration of a flow regime is not equitably distributed among the power companies in the river basin, therefore slowing the establishment of environmental flow programs. Yet, there is no criterion, nor institutional mechanisms, to ensure a fair distribution of the opportunity cost among power stations. This paper addresses this issue by comparing four rules to redistribute the costs faced by the power sector when environmental flows must be implemented in a multireservoir system. The rules are based on the the installed capacity of the power plants, the live storage capacity of the reservoirs, the ratio between the incremental flows and the live storage capacity, and the extent of the storage services; that is, the volume of water effectively transferred by each reservoir. The analysis is carried out using the Parana River Basin (Brazil) as a case study.

  5. Groundwater quality at Alabama Plating and Vincent Spring, Vincent, Alabama, 2007–2008

    USGS Publications Warehouse

    Bradley, Michael W.; Gill, Amy C.

    2014-01-01

    The former Alabama Plating site in Vincent, Alabama, includes the location where the Alabama Plating Company operated an electroplating facility from 1956 until 1986. The operation of the facility generated waste containing cyanide, arsenic, cadmium, chromium, copper, lead, zinc, and other heavy metals. Contamination resulting from the site operations was identified in groundwater, soil, and sediment. Vincent Spring, used as a public water supply by the city of Vincent, Alabama, is located about ½ mile southwest of the site. The U.S. Geological Survey, in cooperation with the U.S. Environmental Protection Agency, conducted an investigation at Vincent Spring and the Alabama Plating site, Vincent, Alabama, during 2007–2008 to evaluate the groundwater quality and evaluate the potential effect of contaminated groundwater on the water quality of Vincent Spring. The results of the investigation will provide scientific data and information on the occurrence, fate, and transport of contaminants in the water resources of the area and aid in the evaluation of the vulnerability of the public water supply to contamination. Samples were analyzed to evaluate the water quality at the former plating site, investigate the presence of possible contaminant indicators at Vincent Spring, and determine the usefulness of stable isotopes and geochemical properties in understanding groundwater flow and contaminant transport in the area. Samples collected from 16 monitor wells near the plating site and Vincent Spring were analyzed for major constituents, trace metals, nutrients, and the stable isotopes for hydrogen (2H/H) and oxygen (18O/16O). Groundwater collected from Vincent Spring was characterized as a calcium-magnesium-bicarbonate water type with total dissolved solids concentrations ranging from 110 to 120 milligrams per liter and pH ranging from about 7.5 to 7.9 units. Groundwater chemistry at the monitor wells at the Alabama Plating site was highly variable by location and depth

  6. 75 FR 76495 - Virginia Electric and Power Company North Anna Power Station, Unit Nos. 1 and 2 Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ...), for North Anna Power Station, Unit Nos. 1 and 2 (NAPS), for Renewed Facility Operating License Nos... operation of NAPS and Surry located in Louisa County, Virginia, and Surry County, Virginia, respectively... completed its environmental assessment of the proposed EAL changes to NAPS and Surry. The staff...

  7. 75 FR 13600 - Virginia Electric and Power Company, North Anna Power Station, Unit Nos. 1 and 2, Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... (NAPS), and Surry Power Station, Unit Nos. 1 and 2 (SPS), located in Louisa, Virginia, and Surry...-atmospheric containment entries at NAPS and SPS. The proposed action is in accordance with the licensee's... Environmental Statement Related to the Continuation of Construction and the Operation'' for NAPS dated...

  8. 77 FR 63342 - Virginia Electric and Power Company, Surry Power Station Units 1 and 2 and North Anna Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... specifications pertaining to change the Emergency Action Levels (EALs) for North Anna Power Station (NAPS) and... related breaker fire that occurred at NAPS on April 22, 2009 (Reference NRC Event Notification Report... Safe Shutdown'' in the EAL Technical Basis Documents to specifically describe how this applies to...

  9. 75 FR 32516 - Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... Station, Unit Nos. 1 and 2 (NAPS) and Surry Power Station, Unit Nos. 1 and 2 (SPS) located in Lake Anna...% nitrogen at SPS and NAPS. The licensee's letter dated November 24, 2009, contains proprietary information... model Firehawk 7 Air Mask SCBA with a gas mixture of 35% oxygen and 65% nitrogen at SPS and NAPS,...

  10. Wetlands mitigation: Partnership between an electric power company and a federal wildlife refuge

    NASA Astrophysics Data System (ADS)

    Perry, Matthew C.; Sibrel, Cynthia B.; Gough, Gregory A.

    1996-11-01

    Nine hectares (23 acres) of a degraded section of Patuxent Research Refuge in Laurel, Maryland, USA, were converted to wetland habitat by the Baltimore Gas and Electric Company in 1994. The wetlands were created as mitigation for 5.7 ha (14 acres) of wetlands that were impacted as part of the construction of an 8.5-km (5.3-mile) 500-kV overhead transmission line on the refuge. The area consists of a created forested wetland of 5.5 ha (13.5 acres), a seasonally inundated green-tree reservoir of 7.6 ha (6.5 acres), and an impounded pond wetland of 1.2 ha (3 acres). Construction included the planting of 6131 trees, 4276 shrubs, and 15,102 emergent plants. Part of the site has been studied intensively since completion and survival of trees and shrubs after two years was 88%. Measurements of these transplants have shown growth greater than on other created sites in Maryland. Grasses and other herbaceous vegetation were dominant plants in the meter-square plots in the first two years of sampling of the created forested wetland. Wildlife surveys for birds, mammals, amphibians, and reptiles have revealed diverse communities. Although these communities represent species consistent with open habitat, more typical forest species should colonize the area as it undergoes succession into a more mature forested wetland. The creation, management, and research of this mitigation site represents an excellent example of a partnership between a private electric power company and a federal wildlife refuge. This partnership has increased local biodiversity and improved regional water quality of the Patuxent River and the Chesapeake Bay.

  11. Wetlands mitigation: Partnership between an electric power company and a federal wildlife refuge

    USGS Publications Warehouse

    Perry, M.C.; Sibrel, C.B.; Gough, G.A.

    1996-01-01

    Twenty-three acres of a degraded section of Patuxent Research Refuge in Laurel, Maryland were converted to wetland habitat by the Baltimore Gas and Electric Company in 1994. The wetlands were created as mitigation for 14 acres of wetlands that were impacted as part of the construction of a 5.3 mile 500kv overhead transmission line on the Refuge. The area consists of a created forested wetland (13.5 acres), a seasonally inundated green-tree reservoir (6.5 acres), and an impounded pond wetland (3 acres). Construction included the planting of 6,131 trees, 4,276 shrubs, and 15,102 emergent plants. Part of the site has been studied intensively since completion and survival of trees and shrubs after 2 years was 88%. Measurements of these transplants, have shown growth greater than on other created sites in Maryland. Grasses and other herbaceous vegetation were dominant plants in the meter-square plots in the first two years of sampling of the created forested wetland. Wildlife surveys for birds, mammals, amphibians, and reptiles have revealed diverse communities. Although these communities represent species consistent with open habitat, more typical forest species should colonize the area as it undergoes succession into a more mature forested wetland. The creation, management, and research of this mitigation site represents an excellent example of a partnership between a private electric power company and a federal wildlife refuge. This partnership has increased local biodiversity and improved regional water quality of the Patuxent River and the Chesapeake Bay.

  12. Wetlands mitigation: Parnership between an electric power company and a federal wildlife refuge

    SciTech Connect

    Perry, M.C.; Sibrel, C.B.; Gough, G.A.

    1996-11-01

    Nine hectares (23 acres) of a degraded section of Patuxent Research Refuge in Laurel, Maryland, USA, were converted to wetland habitat by the Baltimore Gas and Electric Company in 1994. The wetlands were created as mitigation for 5.7 ha (14 acres) of wetlands that were impacted as part o the construction of 8.5-km (5.3-mile) 500-kV over-head transmission line on the refuge. The area consists of a created forested wetland of 5.5 ha(13.5 acres), a seasonally inundated green-free reservoir of 7.6 ha (6.5 acres), and an impounded pond wetland of 1.2 ha (3 acres). Construction included the planting of 6131 trees, 4276 shrubs, and 15,102 emergent plants. Part of the site has been studied intensively since completion and survival of trees and shrubs after two years was 88%. Measurements of these transplants have shown growth greater than on other created sites in Maryland. Grasses and other herbaceous vegetation were dominant plants in the meter-square plots in the first two years of sampling of the created forested wetland. Wildlife surveys for birds, mammals, amphibians, and reptiles have revealed diverse communities. Although these communities represent species consistent with open habitat, more typical forest species should colonize the area as it undergoes succession into a more mature forested wetland. The creation, management, and research of this mitigation site represents an excellent example of a partnership between a private electric power company and a federal wildlife refuge. This partnership has increased local biodiversity and improved regional water quality of the Patuxent River and the Chesapeake Bay. 6 refs., 7 figs., 4 tabs.

  13. Alabama Education News. Volume 31, Number 8

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  14. Alabama Education News. Volume 28, Number 9

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2005-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  15. Alabama Education News. Volume 31, Number 2

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  16. Alabama Education News. Volume 31, Number 5

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  17. Alabama Education News. Volume 30, Number 8

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  18. Alabama Education News. Volume 29, Number 7

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  19. Alabama Education News. Volume 34, Number 3

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  20. Alabama Education News. Volume 33, Number 4

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  1. Alabama Education News. Volume 29, Number 8

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  2. Alabama Education News. Volume 34, Number 2

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  3. Alabama Education News. Volume 31, Number 4

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  4. Alabama Education News. Volume 34, Number 1

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama," as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  5. Alabama Education News. Volume 30, Number 5

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  6. Alabama Education News. Volume 27, Number 6

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2004-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  7. Alabama Education News. Volume 28, Number 1

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2004-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama," as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  8. Alabama Education News. Volume 30, Number 7

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  9. Alabama Education News. Volume 34, Number 4

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2011-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  10. Alabama Education News. Volume 31, Number 6

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  11. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of... Dr. Tianqing Cao, Senior Seismologist, Office of Nuclear Material Safety and Safeguards, has...

  12. 76 FR 59671 - Ocean Renewable Power Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... Energy Regulatory Commission Ocean Renewable Power Company, LLC; Notice of Application Tendered for... of Final Amendments Take notice that the following hydrokinetic pilot project license application has been filed with the Commission and is available for public inspection. a. Type of Application:...

  13. 78 FR 8193 - In the Matter of Virginia Electric and Power Company, and Old Dominion Electric Cooperative; ESP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... COMMISSION In the Matter of Virginia Electric and Power Company, and Old Dominion Electric Cooperative; ESP... Dominion Electric Cooperative (ODEC), hold Early Site Permit 003 (ESP-003) for North Anna Site issued on... assume all of ODEC's rights and obligations, including all rights and obligations under the ESP. A...

  14. 75 FR 9625 - Northern States Power Company-Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company--Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2... holder of Facility Operating License Nos. DPR-42 and DPR-60, which authorize operation of the...

  15. 77 FR 7142 - Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969...

  16. 75 FR 65046 - In the Matter of Cape Systems Group, Inc., Caribbean Cigar Company, Casual Male Corp., Cell Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... COMMISSION In the Matter of Cape Systems Group, Inc., Caribbean Cigar Company, Casual Male Corp., Cell Power Technologies, Inc., Cellmetrix, Inc. (f/k/a BCAM International, Inc.), Cellular Products, Inc. (n/k/a 872 Main... lack of current and accurate information concerning the securities of Cape Systems Group, Inc....

  17. 76 FR 13173 - Jersey Central Power & Light Company and PSEG Fossil, LLC; Notice of Application Tendered for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jersey Central Power & Light Company and PSEG Fossil, LLC; Notice of...-lined transition section; a 478-ft long, 19-ft diameter steel penstock; an 8-ft reducer from...

  18. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... through the ``Generic Environmental Impact Statement for License Renewal of Nuclear Plants: H.B. Robinson... COMMISSION Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental... operation of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP), located in Darlington County,...

  19. 78 FR 6318 - Algonquin Power Company; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Power Company. e. Name of Project: Upper Beaver Falls Hydroelectric Project (P- 2593-030) and Lower Beaver Falls Hydroelectric Project (P-2823-019). f. Location: The Upper and Lower Beaver Falls Hydroelectric Projects are located on the Beaver River in the Towns of Croghan and New Bremen in Lewis...

  20. 75 FR 6225 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC)...

  1. 76 FR 20652 - Idaho Power Company; Notice of Application of Land Management Plan Update for the Bliss, Upper...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Update for the Bliss, Upper Salmon Falls, and Lower Salmon Falls Projects and Soliciting Comments...: Idaho Power Company. e. Name of Projects: Bliss, Upper Salmon Falls, and Lower Salmon Falls... river mile 551 near Bliss to river mile 592 near Hagerman in Twin Falls, Gooding, and Elmore counties....

  2. 76 FR 20722 - In the Matter of Indiana Michigan Power Company; DC Cook Nuclear Plant Independent Spent Fuel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... COMMISSION In the Matter of Indiana Michigan Power Company; DC Cook Nuclear Plant Independent Spent Fuel... notice, in the matter of DC Cook Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI) Order..., 2001, terrorists simultaneously attacked targets in New York, NY, and Washington, DC, using...

  3. Applying wind turbines and battery storage to defer Orcas Power and Light Company distribution circuit upgrades

    SciTech Connect

    Zaininger, H.W.; Barnes, P.R.

    1997-03-01

    The purpose of this study is to conduct a detailed assessment of the Orcas Power and Light Company (OPALCO) system to determine the potential for deferring the costly upgrade of the 25-kV Lopez- Eastsound circuit, by the application of a MW-scale wind farm and battery storage facilities as appropriate. Local wind resource data has been collected over the past year and used to determine MW-scale wind farm performance. This hourly wind farm performance data is used with measured hourly Eastsound load data, and recent OPALCO distribution system expansion plans and cost projections in performing this detailed benefit-cost assessment. The OPALCO distribution circuit expansion project and assumptions are described. MW-scale wind farm performance results are given. The economic benefit-cost results for the wind farm and battery storage applications on the OPALCO system using OPALCO system design criteria and cost assumptions are reported. A recalculation is presented of the benefit-cost results for similar potential wind farm and battery storage applications on other utility systems with higher marginal energy and demand costs. Conclusions and recommendations are presented.

  4. Management of the geomagnetically induced current risks on the national grid company's electric power transmission system

    NASA Astrophysics Data System (ADS)

    Erinmez, I. Arslan; Kappenman, John G.; Radasky, William A.

    2002-03-01

    The National Grid Company plc (NGC) is the owner and operator of one of the world's largest privatised high-voltage electric power transmission systems in England and Wales at 400 and 275kV. As owner operator it is responsible for the secure and reliable delivery of electrical energy to all the 25 million electricity supply customers in England and Wales. The transmission and distribution systems in UK have experienced significant effects during past geomagnetic storm events especially during solar cycles 21 and 22. These effects included generator reactive power output swings, voltage dips, negative sequence alarms and transformer failures. Geomagnetically induced current (GIC) monitoring was installed in 1989 and operational procedures were put in place based on global solar weather forecasts. These measures were not capable of delivering reliable information and thus gave many false operational alarms. Their only real use was for post event forensic purposes. Since the cycle 22 solar peak activity the UK transmission system has developed to become more meshed, heavily loaded and dependent on the availability of reactive compensation equipment for voltage control. NGC carried out GIC impact risk assessment in 1998. This reviewed available options for managing this risk including investigation of blocking measures, a reliable local GIC forecast, GIC monitoring, a review of transmission equipment capabilities to withstand GIC conditions and operational procedures to manage the risk. As a result of the risk assessment NGC completed installation of a Metatech Spacecast/Powercast space weather forecasting system in May 1999. EPRI Sunburst 2000 based transformer monitoring systems were fully integrated in January 2000 in time for peak solar storm activity in solar cycle 23. This paper will describe the risk analysis undertaken, the risk management processes put in place and the performance of the forecasting and monitoring systems, respectively.

  5. INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS

    SciTech Connect

    Unknown

    2001-06-01

    This is the 5th Quarterly Report under this contract. During this period the fabrication of the Advanced ElectroCore field prototype was completed and the unit was prepared to be transported to Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. A last minute check of the installation drawings indicated that the supports would interfere with an existing pipe trench at the plant so a cross-trench support frame was designed and built to span the pipe trench. Figure 1 shows the revised position and the new cross-trench support frame that supports the precharger.

  6. INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS

    SciTech Connect

    Unknown

    2002-03-01

    This is the 6th Quarterly Report under this contract. During this period, the Advanced ElectroCore module precharger and its support frame were installed at Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. This represents the vast portion of the installation work. Ductwork and instrumentation needs to installed before the Advanced ElectroCore module can be tested and demonstrated. Also, the Advanced ElectroCore test plan draft has been prepared, and a design arrangement of a new multipollutant control system with the ElectroCore has been developed.

  7. California encephalitis in Alabama.

    PubMed

    Mancao, M Y; Law, I M; Roberson-Trammell, K

    1996-10-01

    Arthropod-borne virus (arbovirus) infections in humans are primarily central nervous system infections, but other clinical manifestations include febrile illness and fever with hemorrhagic diathesis. In the genus Bunyavirus there are several viruses that cause disease in humans, especially in North America; these include LaCrosse, Jamestown Canyon, trivittatus, and snowshoe hare viruses. The disease seen mainly in children is California encephalitis (usually of the LaCrosse subtype); this infection is widespread in the United States but is most prevalent in the upper Midwest, especially in rural areas. We present the first reported case of California encephalitis in rural Alabama; the patient was a 7-year-old boy who came to us with fever and seizures in the summer of 1994. This report stresses the importance of including California encephalitis in the differential diagnosis when children have fever and altered sensorium after exposure to mosquitoes during summer months.

  8. 75 FR 28595 - Wisconsin Power River Company; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... River Company, P.O. Box 19001, Green Bay, Wisconsin 54307, (920) 433-1094. i. FERC Contact: Jade Alvey at (202) 502-6864 or Jade.Alvey@ferc.gov . j. Deadline for filing comments: June 14, 2010....

  9. 75 FR 29531 - Resale Power Group of Iowa, WPPI Energy v. ITC Midwest LLC, Interstate Power and Light Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    .... EL10-68-000] Resale Power Group of Iowa, WPPI Energy v. ITC Midwest LLC, Interstate Power and Light... Energy (Complainants) filed a formal complaint against ITC Midwest LLC and Interstate Power and...

  10. Libraries in Alabama: MedlinePlus

    MedlinePlus

    ... this page: https://medlineplus.gov/libraries/alabama.html Libraries in Alabama To use the sharing features on ... JavaScript. Birmingham American Sports Medicine Institute Sports Medicine LIBRARY 833 St. Vincent's Drive Suite 205 Birmingham, AL ...

  11. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or

  12. Alabama Education Quick Facts, 2015-2016

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2016

    2016-01-01

    This brochure presents state statistics for Alabama: School Personnel 2015-16; Student Assessment 2014-15; Alabama State Board of Education members; Financial Data FY2015; Graduation Rates 2013-14/2014-15; Alabama Public Schools 2015-16; Public School Size and Enrollment 2015-16; Graduation Requirements 2015-16; Career and Technical Education…

  13. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  14. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  15. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  16. Alabama's Education Report Card, 2011-2012

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2013

    2013-01-01

    Educational progress has been moving in the right direction for several years in Alabama. Now, with the implementation of Alabama's own Plan 2020, an even higher level of accountability for students, teachers, administrators, support systems, and schools/school systems, Alabama is poised to experience unprecedented growth. Add to that, the Alabama…

  17. 78 FR 69411 - Idaho Power Company; Notice of Initiation of Proceeding and Refund Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... Date On November 13, 2013, the Commission issued an order that initiated a proceeding in Docket No... Company, 145 FERC ] 61,122 (2013). The refund effective date in Docket No. EL14-3-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the...

  18. 75 FR 17707 - Alaska Power & Telephone Company; Notice of Declaration of Intention and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... & Telephone Company. e. Name of Project: Neck Lake Hydroelectric Project. f. Location: The proposed Neck Lake Hydroelectric Project will be located on Neck Lake outlet stream, near the community of Whale Pass, Alaska, (T... Project: The proposed Neck Lake Hydroelectric Project would consist of: (1) A small reservoir; (2) a...

  19. Alabama Counseling Association Journal, 1995.

    ERIC Educational Resources Information Center

    Abbott, Gypsy, Ed.; Elliott, Glenda R., Ed.

    1995-01-01

    Communicating ideas and information that will help counselors to implement the counseling role and develop the profession of counseling is the purpose of this journal. The first issue in volume 21 contains the following articles: "Policies and Procedures for Reporting Child Abuse in Alabama: Considerations for Counselors, Teachers, and School…

  20. Antidote: Civic Responsibility. Alabama Law.

    ERIC Educational Resources Information Center

    Phi Alpha Delta Law Fraternity International, Washington, DC.

    Designed for middle school through high school students, this unit contains eight lesson plans that focus on Alabama state law. The state lessons correspond to lessons in the volume, "Antidote: Civic Responsibility. Drug Avoidance Lessons for Middle School & High School Students." Developed to be presented by educators, law student,…

  1. Implementation of Case-Based Reasoning System for Knowledge Management of Power Plant Construction Projects in a Korean Company

    NASA Astrophysics Data System (ADS)

    Jang, Gil-Sang

    Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing corporation-wide case-based reasoning (CBR) system for effectively managing lessons learned knowledge like experiences and know-how obtained in performing power plant construction projects. Our methodology is consisted of 10 steps: user requirement analysis, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface development, integration test. Also, to illustrate the usability of proposed methodology, the practical CBR system is implemented for the plant construction business division of ’H’ company which has international competitiveness in the field of plant construction industry. At present, our CBR system is successfully utilizing as storing, sharing, and reusing the knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  2. Environmental parameters of the Tennessee River in Alabama. 2: Physical, chemical, and biological parameters. [biological and chemical effects of thermal pollution from nuclear power plants on water quality

    NASA Technical Reports Server (NTRS)

    Rosing, L. M.

    1976-01-01

    Physical, chemical and biological water quality data from five sites in the Tennessee River, two in Guntersville Reservoir and three in Wheeler Reservoir were correlated with climatological data for three annual cycles. Two of the annual cycles are for the years prior to the Browns Ferry Nuclear Power Plant operations and one is for the first 14 months of Plant operations. A comparison of the results of the annual cycles indicates that two distinct physical conditions in the reservoirs occur, one during the warm months when the reservoirs are at capacity and one during the colder winter months when the reservoirs have been drawn-down for water storage during the rainy months and for weed control. The wide variations of physical and chemical parameters to which the biological organisms are subjected on an annual basis control the biological organisms and their population levels. A comparison of the parameters of the site below the Power plant indicates that the heated effluent from the plant operating with two of the three reactors has not had any effect on the organisms at this site. Recommendations given include the development of prediction mathematical models (statistical analysis) for the physical and chemical parameters under specific climatological conditions which affect biological organisms. Tabulated data of chemical analysis of water and organism populations studied is given.

  3. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Program Coordinator, ] Idaho Power, PO Box 70, 1221 W Idaho Street, Boise, ID 83702, (208) 388-2964... CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will...

  4. 77 FR 38621 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    .... Applicant Contact: L. Lewis Wardle, Licensing Program Coordinator, Idaho Power, PO Box 70, 1221 W Idaho... requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the...

  5. 77 FR 38620 - Idaho Power Company; Notice of Application for Amendment of License And Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Coordinator, Idaho Power, PO Box 70, 1221 W Idaho Street, Boise, ID 83702, (208) 388-2964, lwardle@idahopower... accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214....

  6. 77 FR 28871 - Algonquin Power Company; Abenaki Timber Corporation; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Robert and Kathi Meyers. The project is located on Cedar Draw Creek in Twin Falls County, Idaho. The... N 3300 E, Twin Falls, Idaho 83301 are now the exemptees of the Little Mac Power Project No....

  7. 77 FR 5817 - Ocean Renewable Power Company, Tidal Energy Project, Cobscook Bay, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... five turbine generator units secured to the ocean floor, used for generating electricity from tidal... an underwater cable assembly to transfer electricity to a power control and grid interface...

  8. 75 FR 35786 - Resale Power Group of Iowa, WPPI Energy v. ITC Midwest LLC, Interstate Power and Light Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... Group of Iowa and WPPI Energy filed a supplement to its complaint originally filed on May 18, 2010. Any... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Resale Power Group of Iowa, WPPI Energy v. ITC Midwest LLC, Interstate...

  9. 75 FR 9449 - Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... North Anna Power Station, Unit Nos. 1 and 2 (NAPS). The licenses provide, among other things, that the... from a certain requirement of these new requirements that NAPS now seeks an exemption from the March 31... the March 31, 2010, compliance date stating that it must perform the required upgrades to the...

  10. 76 FR 6638 - Virginia Electric and Power Company D/B/A/ Dominion Virginia Power and Old Dominion Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... North Anna Power Station (NAPS) site located in Louisa County, Virginia. The NAPS property is located on..., Unit 3, would be located adjacent to the existing NAPS Units 1 and 2. Dominion's revision to its COL... operating a new unit at the NAPS site and identify the significant issues arising from the change in...

  11. 75 FR 4591 - Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Power Station, Unit Nos. 1 and 2 (NAPS). In accordance with 10 CFR 51.21, ``Criteria for and... action would exempt the NAPS from the required implementation date of March 31, 2010, for several new requirements of 10 CFR part 73. Specifically, NAPS would be granted an exemption from being in full...

  12. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ..., pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Sheep Creek Hydroelectric Project (Sheep Creek Project or project) to be located on Sheep Creek, near the City...; (5) a tailrace that would discharge directly into Sheep Creek; (6) a switchyard, located adjacent...

  13. Being in "Bad" Company: Power Dependence and Status in Adolescent Susceptibility to Peer Influence

    ERIC Educational Resources Information Center

    Vargas, Robert

    2011-01-01

    Theories of susceptibility to peer influence have centered on the idea that lower status adolescents are likely to adopt the behaviors of high status adolescents. While status is important, social exchange theorists have shown the value of analyzing exchange relations between actors to understand differences in power. To build on status-based…

  14. 77 FR 66600 - Southwestern Public Service Company v. Southwest Power Pool, Inc.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Power Pool, Inc. (SPP or Respondent), alleging that (1) the transmission rates for SPP Zone 11 are...-County) facilities that are not transmission facilities under the SPP Open Access Transmission Tariff (OATT); and (2) SPP's filing of transmission rates that included the costs of the Tri-County...

  15. 78 FR 25486 - Luminant Generation Company, LLC., Combined License Application for Comanche Peak Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Access and Management System (ADAMS) under Accession No. ML13031A041. Need for the Proposed Action Since... Peak Nuclear Power Plant, Units 3 and 4,'' dated May 13, 2011. Agencies and Persons Consulted On March 11, 2013, the NRC staff consulted with an official from the Texas Department of State Health...

  16. Site Environmental Report for Calendar Year 2003 DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect

    Liu, Ning; Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2004-09-30

    This Annual Site Environmental Report (ASER) for 2003 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing Rocketdyne’s Santa Susana Field Laboratory (SSFL). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2003 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  17. Site Environmental Report for Calendar Year 2000. DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect

    Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2001-09-01

    This Annual Site Environmental Report (ASER) for 2000 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2000 continue to indicate no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

  18. Site Environmental Report for Calendar Year 2001. DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect

    Rutherford, Phil; Samuels, Sandy; Leee, Majelle

    2002-09-01

    This Annual Site Environmental Report (ASER) for 2001 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Boeing Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Closure of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2001 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway. No structural debris from buildings, released for unrestricted use, was transferred to municipal landfills or recycled in 2001.

  19. Tampa Electric Company, Polk Power Station Unit No. 1. Annual report, January--December 1992

    SciTech Connect

    1993-10-01

    As part of the Tampa Electric Polk Power Unit No. 1, a Texaco pressurized, oxygen-blown entrained-flow coal gasifier will convert approximately 2300 tons per day of coal (dry basis) into a medium-BTU fuel gas with a heat content of about 250 BTU/scf (LHV). Syngas produced in the gasifier flows through a high-temperature heat recovery unit which cools the gases prior to entering two parallel clean-up areas. A portion (up to 50%) of the hot syngas is cooled to 1000{degrees}F and passed through a moving bed of zinc titanate sorbent which removed sulfur containing components of the fuel gas. The project will be the first in the world to demonstrate this advanced metal oxide hot gas desulfurization technology at a commercial scale. The remaining portion of the syngas is cooled to 400{degrees}F for conventional acid gas removal. This portion of the plant is capable of processing between 50% and 100% of the dirty syngas. The cleaned low-BTU syngas is then routed to the combined cycle power generation system where it is mixed with air and burned in the gas turbine combustor. Heat is extracted from the expanded exhaust gases by a heat recovery steam generator to produce high pressure steam. This steam, along with the steam generated in the gasification process, drives a steam turbine to generate an additional 132MW of power. Internal process power consumption is approximately 62MW, and includes power for coal grinding, air separation, and feed pumps. Net output from the IGCC demonstration plant will be 260MW.

  20. A feasibility study on the predictive emission monitoring system applied to the Hsinta power plant of Taiwan Power Company.

    PubMed

    Chien, T W; Chu, H; Hsu, W C; Tseng, T K; Hsu, C H; Chen, K Y

    2003-08-01

    The continuous emission monitoring system (CEMS) can monitor flue gas emissions continuously and instantaneously. However, it has the disadvantages of enormous cost, easily producing errors in sampling periods of bad weather, lagging response in variable ambient environments, and missing data in daily zero and span tests and maintenance. The concept of a predictive emission monitoring system (PEMS) is to use the operating parameters of combustion equipment through thermodynamic or statistical methods to construct a mathematic model that can predict emissions by a computer program. The goal of this study is to set up a PEMS in a gas-fired combined cycle power generation unit at the Hsinta station of Taiwan Power Co. The emissions to be monitored include nitrogen oxides (NOx) and oxygen (O2) in flue gas. The major variables of the predictive model were determined based on the combustion theory. The data of these variables then were analyzed to establish a regression model. From the regression results, the influences of these variables are discussed and the predicted values are compared with the CEMS data for accuracy. In addition, according to the cost information, the capital and operation and maintenance costs for a PEMS can be much lower than those for a CEMS.

  1. Measured effects of wind turbine generation at the Block Island Power Company

    NASA Technical Reports Server (NTRS)

    Wilreker, V. F.; Smith, R. F.; Stiller, P. H.; Scot, G. W.; Shaltens, R. K.

    1984-01-01

    Data measurements made on the NASA MOD-OA 200-kw wind-turbine generator (WTG) installed on a utility grid form the basis for an overall performance analysis. Fuel displacement/-savings, dynamic interactions, and WTG excitation (reactive-power) control effects are studied. Continuous recording of a large number of electrical and mechanical variables on FM magnetic tape permit evaluation and correlation of phenomena over a bandwidth of at least 20 Hz. Because the wind-power penetration reached peaks of 60 percent, the impact of wind fluctuation and wind-turbine/diesel-utility interaction is evaluated in a worst-case scenario. The speed-governor dynamics of the diesel units exhibited an underdamped response, and the utility operation procedures were not altered to optimize overall WTG/utility performance. Primary findings over the data collection period are: a calculated 6.7-percent reduction in fuel consumption while generating 11 percent of the total electrical energy; acceptable system voltage and frequency fluctuations with WTG connected; and applicability of WTG excitation schemes using voltage, power, or VARS as the controlled variable.

  2. Settlement with Continental Carbon Company to Reduce Air Pollution at Manufacturing Facilities in Three States

    EPA Pesticide Factsheets

    WASHINGTON - In a settlement with the United States and the states of Alabama and Oklahoma, Continental Carbon Company has agreed to install pollution control technology that will significantly cut emissions of harmful air pollutants at manufacturin

  3. Settlement with Continental Carbon Company to Reduce Air Pollution at Manufacturing Facility in Okla. and Texas

    EPA Pesticide Factsheets

    WASHINGTON - In a settlement with the United States and the states of Alabama and Oklahoma, Continental Carbon Company has agreed to install pollution control technology that will significantly cut emissions of harmful air pollutants at manufacturing facil

  4. Alabama SEP Final Technical Report

    SciTech Connect

    Grimes, Elizabeth M.

    2014-06-30

    Executive Summary In the fall of 2010, the Alabama Department of Economic and Community Affairs (ADECA) launched the Multi-State Model for Catalyzing the National Home Energy Retrofit Market Project (Multi-State Project). This residential energy efficiency pilot program was a collaborative effort among the states of Alabama, Massachusetts, Virginia, and Washington, and was funded by competitive State Energy Program (SEP) awards through the U.S. Department of Energy (DOE). The objective of this project was to catalyze the home energy efficiency retrofit market in select areas within the state of Alabama. To achieve this goal, the project addressed a variety of marketplace elements that did not exist, or were underdeveloped, at the outset of the effort. These included establishing minimum standards and credentials for marketplace suppliers, educating and engaging homeowners on the benefits of energy efficiency and addressing real or perceived financial barriers to investments in whole-home energy efficiency, among others. The anticipated effect of the activities would be increased market demand for retrofits, improved audit to retrofit conversion rates and growth in overall community understanding of energy efficiency. The four-state collaborative was created with the intent of accelerating market transformation by allowing each state to learn from their peers, each of whom possessed different starting points, resources, and strategies for achieving the overall objective. The four partner states engaged the National Association of State Energy Officials (NASEO) to oversee a project steering committee and to manage the project evaluation for all four states. The steering committee, comprised of key program partners, met on a regular basis to provide overall project coordination, guidance, and progress assessment. While there were variances in program design among the states, there were several common elements: use of the Energy Performance Score (EPS) platform; an

  5. 2008-2009 Alabama Education Report Card

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2010

    2010-01-01

    Year after year, the goal of educators, parents, and concerned citizens throughout Alabama is to provide this state's children with the highest level of quality education possible. The future of Alabama's businesses, industries, commerce, labor force, arts, humanities, and countless other areas are determined by the education that is provided to…

  6. Alabama Education Quick Facts: Plan 2020

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2013

    2013-01-01

    This brochure presents state statistics for the following categories; Alabama public schools, 2012-13; Alabama State Board of Education members; financial data, FY 2012; public school size and enrollment, 2012-13 school year; transportation, 2012-13; school meals, 2011-12; school personnel, 2012-13; graduation rates, 2010-11; graduation…

  7. Alabama Education Quick Facts, 2009-2010

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2010

    2010-01-01

    This brochure presents state statistics; Alabama public schools 2009-10; Alabama State Board of Education members; financial data; public school size and enrollment, 2009-10 school year; transportation; school meals; school personnel, 2009-2010; graduation requirements; student assessment; additional enrollment; and dropouts in school year 2008-09.

  8. 40 CFR 81.401 - Alabama.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Alabama. 81.401 Section 81.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF... Visibility Is an Important Value § 81.401 Alabama. Area name Acreage Public Law establishing Federal...

  9. Federal Public Library Programs in Alabama, 1999.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) is charged with improving library services throughout the state to ensure that all citizens have access to quality library and information services. Part of this charge includes the responsibility for receiving and administering federal funds to the more than 200 public libraries in Alabama. Federal…

  10. Federal Public Library Programs in Alabama, 1998.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) is charged with improving library services throughout the state to ensure that all citizens have access to quality library and information services. Part of this charge includes the responsibility for receiving and administering federal funds to the more than 200 public libraries in Alabama. Federal…

  11. 76 FR 9642 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... fees, and several minor editorial changes throughout the document such as changing ``him'' to ``him or... discuss below concern nonsubstantive wording or editorial changes. A. Alabama Code Sec. 9-16-73 Alabama revised its code at Section 9-16-73(a) with several minor editorial changes. There is no...

  12. Alabama Counseling Association Journal, 1998-1999.

    ERIC Educational Resources Information Center

    Magnuson, Sandy, Ed.; Norem, Ken, Ed.

    1999-01-01

    This document consists of the two issues of the "Alabama Counseling Association Journal" that make up volume 24. Articles in Issue 1 include: (1) "Learning Comes in Many Forms" (Holly Forester-Miller); (2) "Legislative, Legal, and Sociological Aspects of Alabama's Mental Health System" (David Gamble; Jamie S.…

  13. 75 FR 1420 - Alabama Disaster # AL-00025

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00025 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of Alabama dated...

  14. 78 FR 4967 - Alabama Disaster #AL-00046

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00046 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of ALABAMA dated...

  15. 78 FR 26100 - Alabama Disaster #AL-00050

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00050 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of Alabama dated...

  16. 76 FR 27141 - Alabama Disaster # AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for the State of Alabama...

  17. 77 FR 7227 - Alabama Disaster #AL-00040

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00040 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for the State of Alabama...

  18. 78 FR 22361 - Alabama Disaster #AL-00049

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00049 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of Alabama dated...

  19. Alabama Public Library Service Annual Report, 1990.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    This annual report highlights the accomplishments of the Alabama Public Library Service (APLS) during 1990. Introductory materials include a map of Alabama's Congressional districts, photographs of the executive board of APLS, and comments from the chairman of the executive board and from APLS' director. Accomplishments are reported under the…

  20. Alabama Public Library Service Annual Report, 1989.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    This annual report highlights the accomplishments of the Alabama Public Library Service (APLS) during 1989. Introductory materials include a map of Alabama's Congressional districts, photographs of the executive board of APLS, and comments from the chairman of the executive board and from APLS' director. The following accomplishments are then…

  1. Alabama's Education Report Card, 2009-2010

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2011

    2011-01-01

    In a more consistent and viable manner than ever before, education in Alabama is moving toward its ultimate goal of providing every student with a quality education, thereby preparing them for work, college, and life after high school. Alabama's graduation rates from 2002 to 2008 increased significantly, tripling the national average increase and…

  2. Alabama Department of Education Quick Facts, 2008

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2009

    2009-01-01

    This brochure presents state statistics; Alabama public schools 2007-08; Alabama State Board of Education members; financial data; public school size and enrollment; transportation; school meals; school personnel, 2007-2008; graduation requirements; student assessment; additional enrollment; and dropouts, 2006-07.

  3. Alabama's Education Report Card 2010-11

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2012

    2012-01-01

    Public education in Alabama is moving in the right direction and is poised to be a national model for the college and career readiness of its students. Through some of the most challenging financial circumstances, public education in Alabama has continued to show great promise in many areas, including reading, math, and science. The success of…

  4. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  5. Section 1: Company directory

    SciTech Connect

    Not Available

    1991-12-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope.

  6. Alabama's Appalachian overthrust amid exploratory drilling resurgence

    SciTech Connect

    Taylor, J.D. ); Epsman, M.L.

    1991-06-24

    Oil and gas exploration has been carried out sporadically in the Appalachian overthrust region of Alabama for years, but recently interest in the play has had a major resurgence. The Appalachian overthrust region of Alabama is best exposed in the valley and ridge physiographic province in the northeast part of the state. Resistant ridges of sandstone and chert and valleys of shales and carbonate have been thrust toward the northwest. Seismic data show that this structural style continues under the Cretaceous overlap. The surface and subsurface expression of the Alabama overthrust extends for more than 4,000 sq miles. Oil and gas have been produced for many years from Cambro-Ordovician, Ordovician, Mississippian, and Pennsylvanian rocks in the nearby Black Warrior basin in Alabama and Mississippi and the Cumberland plateau in Tennessee. The same zones are also potential producing horizons in the Alabama overthrust region.

  7. 76 FR 71961 - Elba Express Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Energy Regulatory Commission Elba Express Company, L.L.C.; Notice of Application Take notice that on October 31, 2011, Elba Express Company, L.L.C. (EEC), 569 Brookwood Village, Suite 501, Birmingham... Affairs, Elba Express Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209,...

  8. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  9. Preliminary survey report: evaluation of brake drum service controls at Indianapolis Power and Light Company, Indianapolis, Indiana

    SciTech Connect

    Godbey, F.W.

    1988-08-01

    An evaluation was made of various control technologies designed to reduce asbestos exposures during brake drum servicing at Indianapolis Power and Light Company, Indianapolis, Indiana. The garage at this facility serviced about 425 vehicles each year with about 200 brake repair jobs being done annually. During servicing, a regular wet and dry vacuum cleaner was used, along with a steam jenny containing liquid soap, and a liquid spray can. Once the wheel was removed, the entire hub area was sprayed with steam foam at 90 pounds per square inch from the steam jenny containing liquid soap. The hub area was vacuumed prior to and following removal. The vacuum cleaner was not equipped with an HEPA filter. A liquid spray can was used to clean the plates. The brake shoe area was vacuumed. Once the brake area was free of all accumulated dust, the brakes were serviced. The author concludes that control measures did not appear to be sufficient to keep asbestos dust from emanating into the atmosphere. The facility was not selected for an in-depth evaluation.

  10. Upward-shoaling cycles in Smackover carbonates of southwest Alabama

    SciTech Connect

    Kopaska-Merkel, D.C.; Mann, S.D. )

    1993-09-01

    Upper Smackover strata in Alabama commonly consist of one or more upward-shoaling cycles about 15 to 50 ft (3 to 16 m) in thickness. Multiple forcing functions (eustasy, regional tilting, salt halokinesis, and autogenic migration of facies) and varying water depths at the start and end of each upward-shoaling cycle generated an array of sedimentary responses. The Brittain No. 1 well, Permit No. 2478, Healing Springs field, Washington County, Alabama, illustrates nucleation of an offshore bar. Bar deposits are capped by anhydritic sabkha deposits, gradationally overlain by subtidal lagoonal strata. Varying rates (and directions ) of halokinesis controlled this succession. Locally varying rates of salt movement created as many as five sabkha-capped cycles in this area. The International Paper company 20-5 Mo. 1 well, Permit No. 5242, Blacksher field, Baldwin County, Alabama, contains three upward-shoaling cycles capped by evaporites. Limited aggradational potential of supratidal evaporitic settings permitted subsidence-caused immersion, which eventually permitted reactivation of the carbonate factory and formation of the next cycle. The Chatom Unit 20-14 No. 1-04 well, Permit No. 7044, Chatom field, Washington County, contains three different cycles. The lower cycle consists of subtidal lime mudstone, capped by a 5-ft (1.5-m) thick soil zone that contains multiple exposure surfaces, tepee structures, and anhydrite pseudomorphs after lenticular gypsum crystals. The soil zone underlies an intraclastic storm deposit followed by a deepening-upward lagoonal succession. A thin ooid grainstone containing exposure surfaces caps the middle cycle. In the upper cycle, peritidal carbonate strata underlie sabkha deposits.

  11. North Alabama water quality assessment

    SciTech Connect

    Not Available

    1987-09-01

    TVA has been involved in an extensive investigation of toxics in fish from reservoirs in north Alabama for several years. The initial study (1984) included several species of fish and a broad array of contaminants. Levels of polychlorinated biphenyls (PCBs) in catfish from Wilson Reservoir were of greatest interest. PCB concentrations in 22 of 45 catfish from Wilson equaled or exceeded the Food and Drug Administration (FDA) tolerance. Catfish from upper Pickwick Reservoir were not as highly contaminated--only one of 18 individuals exceeded the FDA tolerance and the average was substantially below that level. However, in addition to analysis of the 18 individuals, two composites of three catfish each were analyzed from the same locations. 6 refs., 5 figs., 9 tabs.

  12. 2. ALABAMA GATES LOOKING SOUTHEAST ALONG LINED CHANNEL, NOTE CHEMICAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. ALABAMA GATES LOOKING SOUTHEAST ALONG LINED CHANNEL, NOTE CHEMICAL PURIFICATION TANK IN DISTANCE FOR KEEPING DOWN GROWTH OF ALGAE - Los Angeles Aqueduct, Alabama Gates, Los Angeles, Los Angeles County, CA

  13. 77 FR 57022 - Drawbridge Operation Regulation; Alabama River, AL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... governing the Meridian and Bigbee Railroad (MNBR) swing span bridge across the Alabama River at Selma... none was held. B. Basis and Purpose The MNBR swing span bridge crosses the Alabama River at mile...

  14. 26. STARBOARD PROFILE OF ALABAMA (ALABAMIAN) WITH SAILS SET Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. STARBOARD PROFILE OF ALABAMA (ALABAMIAN) WITH SAILS SET Original 2-3/4'x2-1/4' photograph taken c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  15. 78 FR 56980 - Muscle Shoals Reservation Redevelopment, Colbert County, Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... Muscle Shoals Reservation Redevelopment, Colbert County, Alabama AGENCY: Tennessee Valley Authority (TVA... (MSR) in Colbert County, Alabama. The notice of availability (NOA) of the Final Environmental Impact...,036-acre Muscle Shoals/Wilson Dam Reservation in Colbert County, Alabama, in 1933 when...

  16. 75 FR 56085 - Michigan Consolidated Gas Company; Enterprise Texas Pipeline LLC; Enogex LLC; Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Consolidated Gas Company; Enterprise Texas Pipeline LLC; Enogex LLC; Public Service Company of Colorado; Enogex LLC; Enstor Grama Ridge Storage and Transportation, LLC; American Midstream (Alabama Intrastate), LLC; American Midstream (Louisiana Intrastate), LLC; Enstor Katy Storage and Transportation, L.P.;...

  17. 77 FR 31004 - Southern Natural Gas Company; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ...] Southern Natural Gas Company; Notice of Request Under Blanket Authorization Take notice that on May 9, 2012, Southern Natural Gas Company (Southern), 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, filed... Commission's regulations under the Natural Gas Act (NGA), and Southern's blanket certificate issued in...

  18. 77 FR 24483 - Southern Natural Gas Company, L.L.C.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Federal Energy Regulatory Commission Southern Natural Gas Company, L.L.C.; Notice of Filing Take notice that on April 5, 2012, Southern Natural Gas Company, L.L.C. (Southern), 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, filed an application, pursuant to Section 7(b) of the Natural Gas...

  19. 76 FR 14970 - National Starch and Chemical Company, Salisbury, Rowan County, NC; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... AGENCY National Starch and Chemical Company, Salisbury, Rowan County, NC; Notice of Settlement AGENCY... National Starch and Chemical Company Site located in Mobile, Mobile County, Alabama for publication. DATES..., identified by Docket ID No. EPA-RO4- SFUND-2011-0278 or Site name National Starch and Chemical...

  20. Graptemys pulchra Baur 1893: Alabama Map Turtle

    USGS Publications Warehouse

    Lovich, Jeffrey E.; Godwin, James C.; McCoy, C.J.; Rhodin, A. G. J.; Pritchard, P. C. H.; van Dijk, P. P.; Saumure, R.A.; Buhlmann, K.A.; Iverson, J.B.; Mittermeier, R.A.

    2014-01-01

    The Alabama Map Turtle, Graptemys pulchra (Family Emydidae), is a moderately large riverine species endemic to the Mobile Bay drainage system of Alabama, Georgia, and Mississippi. Sexual size dimorphism is pronounced, with adult females (carapace length [CL] to 273 mm) attaining more than twice the size of adult males (CL to 117 mm). The species is an inhabitant of relatively large, swift creeks and rivers, often with wide sandbars. Stream sections open to the sun and with abundant basking sites in the form of logs and brush are preferred. Six to seven clutches of 4–7 eggs are laid each year on river sandbars. Although the species is locally abundant, populations are threatened by habitat destruction, declines in their prey base, commercial collection, and vandalism. It is listed as a Species of Special Concern in Alabama.

  1. Magnitude and frequency of floods in Alabama

    USGS Publications Warehouse

    Atkins, J. Brian

    1996-01-01

    Methods of estimating flood magnitudes for recurrence intervals of 2, 5, 10, 25, 50, 100, 200, and 500 years are described for rural streams in Alabama that are not affected by regulation or urbanization. Flood-frequency characteristics are presented for 198 gaging stations in Alabama having 10 or more years of record through September 1991, that are used in the regional analysis. Regression relations were developed using generalized least-squares regression techniques to estimate flood magnitude and frequency on ungaged streams as a function of the drainage area of a basin. Sites on gaged streams should be weighted with gaging station data that are presented in the report. Graphical relations of peak discharges to drainage areas are also presented for sites along the Alabama, Black Warrior, Cahaba, Choctawhatchee, Conecub, and Tombigbee Rivers. Equations for estimating flood magnitudes on ungaged urban streams (taken from a previous report) that use drainage area and percentage of impervious cover as independent variables also are given.

  2. 76 FR 26771 - Florida Power & Light Company; Turkey Point, Units 3 and 4; Notice of Consideration of Issuance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... thermal (MWt) to 2644 MWt. The increase in core thermal power will be approximately 15 percent, including... licensed core thermal power level and is categorized as an Extended Power Uprate. The proposed amendment... to support operation at the increased core thermal power level. Before issuance of the...

  3. 76 FR 33789 - Florida Power & Light Company, St. Lucie Plant, Unit 1; Notice of Consideration of Issuance of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... thermal (MWt) to 3020 MWt. The increase in core thermal power will be approximately 12 percent, including... licensed core thermal power level and is categorized as an extended power uprate. The proposed amendment... operation at the increased core thermal power level. Before issuance of the proposed license amendment,...

  4. Ground-water program in Alabama

    USGS Publications Warehouse

    LaMoreaux, P.E.

    1955-01-01

    Several recent years of drought have emphasized the importance of Alabama's ground-water supplies, a matter of concern to us all.  So far we have been blessed in Alabama with ample ground-water, although a combination of increased use, waste, pollution, and drought has brought about critical local water shortages.  These problems serve as a fair warning of what lies ahead if we do not take the necessary steps to obtan adequate knowledge of our ground-water resources.

  5. Unleash the Power! Knowledge - Technology - Diversity: Papers Presented at the Third International Forum on Research in School Librarianship, Annual Conference of the International Association of School Librarianship (IASL) (28th, Birmingham, Alabama, November 10-14, 1999).

    ERIC Educational Resources Information Center

    Lighthall, Lynne, Ed.; Howe, Eleanor, Ed.

    Papers presented at this forum were grouped under the following four broad themes: "Unleash the Power!,""Powerful Roles,""Powerful Partnerships," and "Powerful Technologies." Also included is the paper that won the Takeshi Murofushi Research Award, "Implementing Flexible Scheduling in Elementary…

  6. Health-hazard evaluation report HETA 91-213-2123, G. T. Jones Tire and Battery Distributing Inc. , Birmingham, Alabama

    SciTech Connect

    Gittleman, J.; Estacio, P.; O'Brien, D.; Montopoli, M.

    1991-06-01

    In response to a request for technical assistance from the Alabama Health Department, possible hazardous working conditions at the G.T. Jones Tire and Battery Distributing Company (SIC-5093), Birmingham, Alabama were evaluated. The company employed 15 persons in battery breaking and recycling. Twelve of the workers had blood lead (7439921) levels over 60 micrograms/deciliter (microg/dl) and the average of the last three blood levels exceeded 50microg/dl for 13 of the employees. Blood lead levels greater than 60 were associated with biochemical evidence of impaired heme synthesis and impaired renal function. Fourteen workers had elevated zinc protoporphyrin (ZPP) levels over 100microg/dl consistent with moderate lead poisoning. Three had ZPPs over 600 microg/dl, consistent with severe lead poisoning. The authors conclude that a health hazard existed from overexposure to lead. The authors recommend measures to reduce exposures.

  7. Desegregation in Birmingham, Alabama: A Case Study.

    ERIC Educational Resources Information Center

    Bynum, Effie; And Others

    In May 1974, a five member study team from Teachers College, Columbia University spent four and one-half days in Birmingham, Alabama, for the purpose of (1) collecting information that describes the desegregation process as it evolved, (2) interviewing principals, administrators, teachers, students and community leaders relative to their…

  8. University of South Alabama Faculty Handbook.

    ERIC Educational Resources Information Center

    University of South Alabama, Mobile.

    Concerned primarily with policies, procedures, regulations, channels of communication, and benefits for the faculty, the 1974 faculty handbook of the University of South Alabama discusses: (1) organization and administration; (2) colleges, divisions, departments, and programs; (3) university facilities and services; (4) student-related…

  9. 76 FR 29810 - Alabama Disaster #AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for Public Assistance Only for...

  10. 75 FR 474 - Alabama Disaster #AL-00026

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... [Federal Register Volume 75, Number 2 (Tuesday, January 5, 2010)] [Notices] [Pages 474-475] [FR Doc No: E9-31259] SMALL BUSINESS ADMINISTRATION [Disaster Declaration 11988 and 11989] Alabama Disaster AL-00026 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice...

  11. 75 FR 26814 - Alabama Disaster #AL-00031

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... [Federal Register Volume 75, Number 91 (Wednesday, May 12, 2010)] [Notices] [Pages 26814-26815] [FR Doc No: 2010-11201] SMALL BUSINESS ADMINISTRATION [Disaster Declaration 12157 and 12158] Alabama Disaster AL-00031 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice...

  12. 75 FR 26813 - Alabama Disaster #AL-00029

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... [Federal Register Volume 75, Number 91 (Wednesday, May 12, 2010)] [Notices] [Pages 26813-26814] [FR Doc No: 2010-11199] SMALL BUSINESS ADMINISTRATION [Disaster Declaration 12155 and 12156] Alabama Disaster AL-00029 AGENCY: Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of...

  13. The University of Alabama's Integrated Science Program.

    ERIC Educational Resources Information Center

    Rainey, Larry; Mitrook, Kim

    This program, supported by the Center for Communication and Educational Technology at the University of Alabama, incorporates the perspectives of biology, earth/space science, chemistry, and physics into an innovative science curriculum for the middle grades. Students are engaged for 20 minutes 3 times a week by an on-air instructor who is doing…

  14. Chemical Technician Manpower Survey: State of Alabama.

    ERIC Educational Resources Information Center

    Watkins, Donald; And Others

    The study was undertaken to assess the needs of Alabama's industry for chemical technicians and to determine the kinds and levels of skills required by major employers. Of the 75 organizations responding to the questionnaire with usable data, 62 were private industries, 6 were testing laboratories, and 7 were federal agencies. Generally, the study…

  15. 76 FR 30008 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901 Alabama Regulatory Program AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment...

  16. 76 FR 9700 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901 Alabama Regulatory Program AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment... Mining Reclamation and Enforcement (OSM), are announcing receipt of a proposed amendment to the...

  17. Alabama Public Library Service, 1987 Annual Report.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    Designed to provide an overview of the range and quality of services provided by the Alabama Public Library Service (APLS), this annual report focuses on the 1987 activities of APLS. A report on the activities of the Library Development Division shows the allocation of state aid and Library Services and Construction Act (LCSA) Titles I and III…

  18. Implementation of Alabama Resources Information System, ARIS

    NASA Technical Reports Server (NTRS)

    Herring, B. E.

    1978-01-01

    Development of ARIS - Alabama Resources Information System is summarized. Development of data bases, system simplification for user access, and making information available to personnel having a need to use ARIS or in the process of developing ARIS type systems are discussed.

  19. RCP Local School Projects in Alabama.

    ERIC Educational Resources Information Center

    Regional Curriculum Project, Atlanta, GA.

    One of 6 state reports generated by the Regional Curriculum Project (funded under the Elementary and Secondary Education Act), the document describes 4 specific projects implemented through the Alabama State Superintendent's Office beginning in 1966. All 4 projects were designed to improve instructional leadership by defining the role(s) of the…

  20. Oak Mountain High School, Shelby County, Alabama.

    ERIC Educational Resources Information Center

    Design Cost Data, 2001

    2001-01-01

    Presents design features of the Oak Mountain High School (Alabama) consisting of an academic side of classrooms, administration, and media center; and an activity side consisting of cafeteria, gymnasium, practice gym, and a theater. The school's floor plan and photos are included. (GR)

  1. Alabama Kids Count 2001 Data Book.

    ERIC Educational Resources Information Center

    Curtis, Apreill; Bogie, Don

    This Kids Count data book examines statewide trends in well-being for Alabama's children. The statistical portrait is based on 17 indicators in the areas of health, education, safety, and security. The indicators are: (1) infant mortality rate; (2) low weight births; (3) child health index; (4) births to unmarried teens; (5) first grade retention;…

  2. Alabama Kids Count 2002 Data Book.

    ERIC Educational Resources Information Center

    Curtis, Apreill; Bogie, Don

    This Kids Count data book examines statewide trends in well-being of Alabamas children. The statistical portrait is based on 18 indicators in the areas of child health, education, safety, and security: (1) infant mortality rate; (2) low weight births; (3) child health index; (4) births to unmarried teens; (5) first grade retention; (6) school…

  3. Significance of selected lineaments in Alabama

    NASA Technical Reports Server (NTRS)

    Drahovzal, J. A.; Neathery, T. L.; Wielchowsky, C. C.

    1974-01-01

    Four lineaments in the Alabama Appalachians that appear on ERTS-1 imagery have been geologically analysed. Two of the lineaments appear to have regional geologic significance, showing relationships to structural and stratigraphic frameworks, water and mineral resources, geophysical anomalies, and seismicity. The other two lineaments are of local geologic significance, but, nevertheless, have important environmental implications.

  4. New technology N products in alabama

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Because of high fertilizer N prices, growers are interested in using less expensive sources of N and using fertilizer additives to reduce ammonia volatilization losses from urea sources. An experiment on a Lucedale fine sandy loam in Central Alabama (Prattville Research Unit) was conducted in 2007 ...

  5. New technology N products in alabama

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Because of high fertilizer N prices, growers are interested in using less expensive sources of N and using fertilizer additives to reduce ammonia volatilization losses from urea sources. An experiment on a Lucedale fine sandy loam in Central Alabama (Prattville Research Unit) was conducted in 2007 t...

  6. Financial Reporting for Alabama Public Universities.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    Guidelines for preparing year-end financial reports are provided for Alabama public university staff to insure that reporting formats produce comparable financial reports and to keep up with recent developments in college accounting and financial reporting. The public institutions comply with two publications issued by the American Institute of…

  7. 2016 Alabama PV soft cost and workforce development

    SciTech Connect

    Fox, E.; Edwards, T.

    2016-12-01

    installation professionals and electricians. Despite the cost of solar, the industry continues to struggle in Alabama, largely due to the absence of any statewide net metering legislation. By current best estimates, there are over 60 residential installations statewide; however, this number is difficult to track due to the lack of a State authority keeping a consolidated list of grid connected distributed power systems. In South Carolina, the Energy Office tracks and reports grid connected distributed power systems by all Cooperatives and utilities. In Alabama, the Energy Office does not fulfill this role and data must be collected directly from each utility and cooperative, which makes collection and analysis difficult. Having a central state agency track this information would be extremely useful towards developing state policy recommendations, particularly if net metering were enabled within the state.

  8. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  9. Smart Companies.

    ERIC Educational Resources Information Center

    Galagan, Patricia A.

    1997-01-01

    Capturing and leveraging knowledge is an important new management trend that is as yet undefined. Some companies are accounting for their intellectual capital and applying it to the company balance sheets. (JOW)

  10. Water use, availability, and net demand in the Tennessee River watershed within Alabama, 2005

    USGS Publications Warehouse

    Gill, Amy C.; Harper, Michael J.; Littlepage, Thomas M.

    2013-01-01

    The U.S. Geological Survey worked in cooperation with the Alabama Department of Economic and Community Affairs—Office of Water Resources to estimate water use and water availability for 2005 for the portion of the Tennessee River watershed contained within the borders of the State of Alabama. Estimates of water use and availability are an important part of planning for population and economic growth in the Tennessee River watershed in Alabama. Total water use for the region in 2005 was 5,197 million gallons per day (Mgal/d). Total surface-water withdrawals were 5,139 Mgal/d, and total groundwater withdrawals were about 58 Mgal/d. About 92 percent of the total water withdrawn was surface water used for once-through cooling for thermoelectric power generation. Self-supplied industrial and public-supply water uses accounted for the next greatest uses of water, constituting approximately 49 and 42 percent, respectively, of the total water use excluding thermoelectric power use. Summaries of water use by county and subbasin indicated the areas of greatest water withdrawals and use within the Tennessee River watershed. Limestone (2,012 Mgal/d), Jackson (1,498 Mgal/d), and Colbert (1,363 Mgal/d) Counties were the counties with the greatest total water use in 2005 and had large amounts of water withdrawn for thermoelectric power generation. When water use from thermoelectric power generation was not considered, the counties with the greatest withdrawals were Morgan (124 Mgal/d), Madison (72 Mgal/d), Colbert (69 Mgal/d), and Lawrence (67 Mgal/d). The subbasin with the greatest total water use was Wheeler Lake (2,260 Mgal/d) in the Middle Tennessee—Elk subregion. Wheeler Lake subbasin also had the greatest public-supply, irrigation, industrial, mining, and thermoelectric withdrawals of any subbasin in the Tennessee River watershed within Alabama. Total water availability for the Tennessee River watershed within Alabama was estimated to be 34,567 Mgal/d by the Geological

  11. U.S. hydropower resource assessment for Alabama

    SciTech Connect

    Conner, A.M.; Francfort, J.E.

    1998-02-01

    The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Alabama.

  12. 77 FR 18173 - Endangered and Threatened Wildlife and Plants; Endangered Status for the Alabama Pearlshell...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ...; Endangered Status for the Alabama Pearlshell, Round Ebonyshell, Southern Sandshell, Southern Kidneyshell, and... the October 4, 2011, rule proposing endangered status for the Alabama pearlshell (Margaritifera... relevant to the designation of critical habitat for the Alabama pearlshell, round ebonyshell,...

  13. 77 FR 65843 - Proposed Flood Elevation Determinations for Montgomery County, Alabama and Incorporated Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Montgomery County, Alabama and Incorporated Areas AGENCY: Federal Emergency Management Agency, DHS. ACTION... proposed rule concerning proposed flood elevation determinations for Montgomery County, Alabama and... sources in Montgomery County, Alabama. FEMA is withdrawing the proposed rulemaking and intends to...

  14. Delivery of nursing care in Alabama public schools.

    PubMed

    Terry, Allison J

    2009-02-01

    Many states, including Alabama, allow registered nurses (RNs) in school settings to delegate procedures such as assistance with medication to unlicensed assistive personnel. In Alabama, the Board of Nursing(the Board) is accountable for enforcing the regulations that allow for this action. The Alabama Board of Nursing Administrative Code addresses delegation by school nurses and lists specific tasks that cannot be delegated because they require nursing judgment. As a result of this reporting requirement, Alabama's Center for Nursing, a division of the Board of Nursing, implemented an annual survey of school nurses to determine how nursing care is delivered to students in Alabama public schools. This study investigates the results of this survey and its implications for school nursing both in Alabama and in other states.

  15. 75 FR 54920 - In the Matter of Pacific Gas & Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... management of the Diablo Canyon Nuclear Power Plant's design/ licensing basis which undermines PG&E's ability... Electronic Hearing Docket webpage at http://ehd1.nrc.gov/EHD/ . The time and date of the evidentiary...

  16. Water withdrawals in the Black Warrior-Tombigbee Basin in Alabama, 1985-87

    USGS Publications Warehouse

    Mooty, W.S.

    1995-01-01

    Public-supply, industrial, and power generation water withdrawals were inventoried for the Black Warrior-Tombigbee basin in Alabama for 1987. A water source capacity analysis was done for each facility to assess the risk of the future water demand exceeding the capacity of the current source. Approximately 96 percent of all water withdrawn in the study area was surface water. Surface water accounted for 88 percent of withdrawals by public suppliers and 99 percent of withdrawals by self- supplied industries.

  17. Historic Landscape Survey, Maxwell AFB, Alabama

    DTIC Science & Technology

    2013-08-01

    lands in Alabama. Also at this time, investigators conducted a Cold War era architectural resources survey at Maxwell AFB and Gunter Annex. This...as suggestions for possible planting strategies for the component landscapes. 5.1 Overall management guidelines • The Maxwell AFB road network was...lists, consult with the Maxwell AFB Natural Resources Manager or horticulturalist. ERDC/CERL TR-13-12 217 Table 3. Trees approved for planting on

  18. Development of Alabama Resources Information System (ARIS)

    NASA Technical Reports Server (NTRS)

    Herring, B. E.; Vachon, R. I.

    1976-01-01

    A formal, organized set of information concerning the development status of the Alabama Resources Information System (ARIS) as of September 1976 is provided. A series of computer source language programs, and flow charts related to each of the computer programs to provide greater ease in performing future change are presented. Listings of the variable names, and their meanings, used in the various source code programs, and copies of the various user manuals which were prepared through this time are given.

  19. 76 FR 27139 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ...): Alabama: Baldwin, Mobile Georgia: Floyd, Polk Mississippi: Clarke, Greene, Wayne, Tennessee: Franklin... Federal Domestic Assistance Numbers 59002 and 59008) James E. Rivera, Associate Administrator for...

  20. NREL and Sandia National Laboratories (SNL) Support of Ocean Renewable Power Company's TidGen™ Power System Technology Readiness Advancement Initiative Project

    SciTech Connect

    LiVecchi, Al

    2015-05-07

    This document summarizes the tasks identified for National Laboratory technical support of Ocean Renewable Power Corporation (ORPC) DOE grant awarded under the FY10 Industry Solicitation DE-FOA-0000293: Technology Readiness Advancement Initiative. The system ORPC will deploy in Cobscook Bay, ME is known as the TidGen™ Power System. The Turbine Generator Unit (TGU) each have a rated capacity of 150 to 175 kW, and they are mounted on bottom support frames and connected to an onshore substation using an underwater power and control cable. This system is designed for tidal energy applications in water depths from 60 to 150 feet. In funding provided separately by DOE, National Laboratory partners NREL and SNL will provide in-kind resources and technical expertise to help ensure that industry projects meet DOE WWPP (Wind and Water Power Program) objectives by reducing risk to these high value projects.

  1. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    SciTech Connect

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  2. 76 FR 29277 - Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... the PBAPS Low-Level Radioactive Waste Storage Facility (LLRWSF). The proposed action is in accordance... waste disposal facility, located in Barnwell, has limited access to the facility from radioactive waste... Low-Level Radioactive Wastes at Power Reactor Sites,'' November 10, 1981, and to meet...

  3. 78 FR 63506 - Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... 2003 (ADAMS Accession No. ML033640024). III. Draft Environmental Assessment Plant Site and Environs... because it exceeds the typical 7 percent power increase that can be accommodated with only minor plant changes. An EPU usually requires significant modifications to major plant equipment. The proposed EPU...

  4. Site environmental report for calendar year 2002. DOE operations at the Boeing Company, Rocketdyne Propulsion and Power

    SciTech Connect

    2003-09-30

    This Annual Site Environmental Report (ASER) for 2002 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing' s Santa Susana Field Laboratory (SSFL)). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988, and, subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2002 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property ( land, structures, waste), and recycling. All radioactive w astes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste disposal. No liquid radioactive wastes are released into the environment, and no structural debris from buildings w as transferred to municipal landfills or recycled in 2002.

  5. Installation of an Energeo biomass power plant at a lumber company. Technical report, 27--29 June 1995

    SciTech Connect

    Sanders, C.F.; Purvis, C.R.

    1995-06-01

    Energeo, Inc. is engaged in a demonstration test program of its AGRIPOWER 200 unit fueled with biomass at Sutton Lumber Company in Tennga, Georgia. The objective of the program is to evaluate the operating and performance characteristics of the system using lumber wastes for fuel. The program is scheduled to accumulate 800 hours of operation over a period of 1 to 2 years. The program became a reality due to initial funding from the US Department of Defense`s (DoD`s) Strategic Environmental Research and Development Program (SERDP) and the US Environmental Protection Agency`s (EPA`s) Air and Energy Engineering Research Laboratory (now referred to as National Risk Management Research Laboratory (NRMRL), Research Triangle Park). The AGRIPOWER unit operates with an open Brayton cycle using a fluid bed combustor and several heat exchangers to heat compressed air which in turn drives a turbine/generator (T/G) set. The T/G set, which includes the compressor and a recuperator, is a Solar Spartan unit packaged for this application by Alturdyne, Inc. The combustor utilizes both in-bed and freeboard combustion zones, and the above-bed zone is well mixed to provide uniform temperatures.

  6. Predictive Power of Incidents Reporting Rate and Its Dimensions by Job Stress among Workers’ Isfahan Steel Company

    PubMed Central

    Kiani, F; Samavatyan, H; Pourabdian, S; Jafari, E

    2011-01-01

    Background: There is long-term interest in the effects of stress on health, due to the strain that it places on individuals which can lead to an increased risk of disease. The present study examined degree of perceived job stress related to incidents reporting rate and its dimensions among workers’ Isfahan Steel Company. Methods: A self-administered anonymous was distributed to 189 workers. The survey included demographic factors, incidents reporting rate and its components (physical symptoms, psychological symptoms and accidents) and the Job Stress Questionnaire. The data were analyzed by multivariate (MANOVA) and correlation techniques. Results: 1) there was internal significant correlation between perceived job stress with incident reporting rate as well as with its two components namely physical symptoms and psychological symptoms; 2) there was not a significant relationship between perceived job stress and accident; 2) In multivariate analysis, perceived job stress respectively about 12%, 18% and 19% of the variance of variables of incidents reporting rate, physical and psychological symptoms significantly predicted (P< 0.05). Conclusion: Perceived job stress influences to physical and psychological symptoms. Therefore, decreasing job stress can be important to prevent the development of stress-related diseases and to promote workers health. PMID:23113092

  7. Evaluation of the Alabama Direct Assessment of Writing Program.

    ERIC Educational Resources Information Center

    McLean, James E.; Snyder, Scott W.; Abbott, Gypsy; Reid, Brian; Ernest, James; Heath, Roy

    A study evaluated the Alabama Direct Assessment of Writing Program. The comprehensive evaluation examined the background literature, the psychometric characteristics, and the impact of the writing assessment both quantitatively and qualitatively. Results indicated that: (1) the majority of fifth- and seventh-grade students in Alabama do not…

  8. Phorid Flies in Alabama: A tale of two species

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Two species of phorid fly have been released at 11 sites in Alabama and have been recovered from 9 sites. Pseudacteon tricuspis Borgmeier (Diptera: Phoridae) was released in South Alabama in populations of the red imported fire ant, Solenopsis invicta Buren (Hymenoptera: Formicidae), and Pseudacteon...

  9. 14. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Southern RR at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Southern RR at Epes Alabama Great Southern RR bridge. View from S. Copy of photo taken in 1922 by Jack Donnell, Columbus, Ms. Sarcone Photography, Columbus, Ms., Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  10. Inservice Education at a Distance: A Rural Consortium in Alabama

    ERIC Educational Resources Information Center

    Addleton, Robert L.; Edmonds, Charles; Gamble, Lanny; Watkins, J. Foster

    1983-01-01

    The articles describes the efforts of seven rural systems in northeast Alabama to respond in a cooperative manner to new initiatives from the State Department of Education to improve their inservice/staff development programs. The University of Alabama, primarily through its Gadsden Center, provided professional support and coordinating…

  11. Network of Alabama Academic Libraries Collection Assessment Manual.

    ERIC Educational Resources Information Center

    Medina, Sue O.; And Others

    This manual was developed to assist the members of the Network of Alabama Academic Libraries in the library collection assessment that is now required by the Alabama Commission on Higher Education as a component of any proposal that an institution submits for new program review and approval. This assessment component considers the ability of the…

  12. 77 FR 67660 - Cahaba River National Wildlife Refuge, Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... River (including associated fish, wildlife, and plant species); (2) conserve, enhance, and restore... Fish and Wildlife Service Cahaba River National Wildlife Refuge, Alabama AGENCY: Fish and Wildlife... Cahaba River National Wildlife Refuge (NWR) in Bibb County, Alabama. We provide this notice in...

  13. Dimensions 2000: A Strategic Plan for Building Alabama's Future.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This report delineates the strategic plan of the Alabama College System, representing the culmination of a cooperative endeavour between the Alabama College System and the business community to identify the current needs of business and industry, design programs, and reduce the time between the emergence of technological innovations and their…

  14. 40 CFR 282.50 - Alabama State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Alabama State-Administered Program. 282.50 Section 282.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... establish and protect wellhead areas from contaminants. (C) Alabama Department of Environmental...

  15. 40 CFR 282.50 - Alabama State-Administered Program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Alabama State-Administered Program. 282.50 Section 282.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... establish and protect wellhead areas from contaminants. (C) Alabama Department of Environmental...

  16. 40 CFR 282.50 - Alabama State-Administered Program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Alabama State-Administered Program. 282.50 Section 282.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... establish and protect wellhead areas from contaminants. (C) Alabama Department of Environmental...

  17. 40 CFR 282.50 - Alabama State-Administered Program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Alabama State-Administered Program. 282.50 Section 282.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... establish and protect wellhead areas from contaminants. (C) Alabama Department of Environmental...

  18. 40 CFR 282.50 - Alabama State-Administered Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Alabama State-Administered Program. 282.50 Section 282.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... establish and protect wellhead areas from contaminants. (C) Alabama Department of Environmental...

  19. 24. STARBOARD PROFILE OF ALABAMA (ALABAMIAN); VESSEL AT ANCHOR ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. STARBOARD PROFILE OF ALABAMA (ALABAMIAN); VESSEL AT ANCHOR ON STATION IN GULF OF MEXICO WITH MOTOR BOAT TIED AT STERN Original 4-3/4'x6-3/4' photograph taken c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  20. 25. VIEW OF ALABAMA (ALABAMIAN) FROM OFF PORT BOW; VESSEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF ALABAMA (ALABAMIAN) FROM OFF PORT BOW; VESSEL AT ANCHOR ON STATION IN GULF OF MEXICO WITH MOTOR BOAT TIED AT STERN Original 4-3/4'x6-3/4' photograph taken c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  1. 23. VIEW FROM STARBOARD BOW OF ALABAMA AS 'ALABAMIAN.' Uncopyrighted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. VIEW FROM STARBOARD BOW OF ALABAMA AS 'ALABAMIAN.' Uncopyrighted 3-1/2'x5-5/8' postcard; image taken on station in Gulf of Mexico, c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  2. A Study of School Size among Alabama's Public High Schools

    ERIC Educational Resources Information Center

    Lindahl, Ronald A.; Cain, Patrick M., Sr.

    2012-01-01

    The purpose of this study was to examine the relationship between the size of Alabama's public high schools, selected school quality and financial indicators, and their students' performance on standardized exams. When the socioeconomic level of the student bodies is held constant, the size of high schools in Alabama has relatively little…

  3. Alabama University Professor's View of the Birmingham Bombing Trial.

    ERIC Educational Resources Information Center

    Journal of Blacks in Higher Education, 2001

    2001-01-01

    Presents the views of Alabama university scholars regarding the historical significance of the 2001 trial of Thomas Blanton for his role in the Ku Klux Klan bombing of the Sixteenth Street Baptist church in Birmingham, Alabama thet killed four girls. Their discussions note the need to examine the American judicial system, the weak case against Mr.…

  4. 77 FR 60904 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... October 7, 2009, SIP revision regarding reasonably available control technology (RACT) and reasonably... the mobile source contribution to ambient PM 2.5 levels for the Alabama portion of the Chattanooga... insignificance determination for mobile direct PM 2.5 and NO X emissions for transportation conformity...

  5. The planning and implementation of a demand-side management/distribution automation system at Taiwan Power Company

    SciTech Connect

    Liu, S.S.; Chen, Yun-Wu

    1994-12-31

    This paper would describe the Taipower`s experience of DSM/DAS development. For the past 5 years, the demand of electricity has maintained a high annual growth rate of 8.45% due to economic prosperity in Taiwan. As the environmental protection consciousness has recently made Taipower difficult to develope and construct new power plants, substations, transmission and distribution lines, and our power grid is an independent system, we do need to concern how to do DSM to manage the load problems. Since 1984, Taipower has established two pilot systems and these systems performed the functions of fault detect and isolation certainly good for Distribution Automation. With the rapid development of computer, communication and control technology, the concept of the DAS has gradually been implemented in real cases. Taipower organized an engineering task group to study DAS several years ago, and based on the operation experience of the existing systems, today Taipower is planning to launch a new DAS project for Tai-Chung area. According to Taipower requirements, the DAS will have the functions of feeder automation, automatic meter reading, load management and disteibution system analysis.

  6. Reservoir characterization of the Smackover Formation in southwest Alabama

    SciTech Connect

    Kopaska-Merkel, D.C.; Hall, D.R.; Mann, S.D.; Tew, B.H.

    1993-02-01

    The Upper Jurassic Smackover Formation is found in an arcuate belt in the subsurface from south Texas to panhandle Florida. The Smackover is the most prolific hydrocarbon-producing formation in Alabama and is an important hydrocarbon reservoir from Florida to Texas. In this report Smackover hydrocarbon reservoirs in southwest Alabama are described. Also, the nine enhanced- and improved-recovery projects that have been undertaken in the Smackover of Alabama are evaluated. The report concludes with recommendations about potential future enhanced- and improved-recovery projects in Smackover reservoirs in Alabama and an estimate of the potential volume of liquid hydrocarbons recoverable by enhanced- and improved-recovery methods from the Smackover of Alabama.

  7. Power performance

    SciTech Connect

    Anderson, J.

    1996-04-01

    Two power generation engineering and construction firms with international markets are briefly described in this article. Bibb and Associates and Black & Veatch, both Kansas-based companies, are discussed. Current projects and services provided by the companies are described.

  8. Soil Sampling Techniques For Alabama Grain Fields

    NASA Technical Reports Server (NTRS)

    Thompson, A. N.; Shaw, J. N.; Mask, P. L.; Touchton, J. T.; Rickman, D.

    2003-01-01

    Characterizing the spatial variability of nutrients facilitates precision soil sampling. Questions exist regarding the best technique for directed soil sampling based on a priori knowledge of soil and crop patterns. The objective of this study was to evaluate zone delineation techniques for Alabama grain fields to determine which method best minimized the soil test variability. Site one (25.8 ha) and site three (20.0 ha) were located in the Tennessee Valley region, and site two (24.2 ha) was located in the Coastal Plain region of Alabama. Tennessee Valley soils ranged from well drained Rhodic and Typic Paleudults to somewhat poorly drained Aquic Paleudults and Fluventic Dystrudepts. Coastal Plain s o i l s ranged from coarse-loamy Rhodic Kandiudults to loamy Arenic Kandiudults. Soils were sampled by grid soil sampling methods (grid sizes of 0.40 ha and 1 ha) consisting of: 1) twenty composited cores collected randomly throughout each grid (grid-cell sampling) and, 2) six composited cores collected randomly from a -3x3 m area at the center of each grid (grid-point sampling). Zones were established from 1) an Order 1 Soil Survey, 2) corn (Zea mays L.) yield maps, and 3) airborne remote sensing images. All soil properties were moderately to strongly spatially dependent as per semivariogram analyses. Differences in grid-point and grid-cell soil test values suggested grid-point sampling does not accurately represent grid values. Zones created by soil survey, yield data, and remote sensing images displayed lower coefficient of variations (8CV) for soil test values than overall field values, suggesting these techniques group soil test variability. However, few differences were observed between the three zone delineation techniques. Results suggest directed sampling using zone delineation techniques outlined in this paper would result in more efficient soil sampling for these Alabama grain fields.

  9. 2012 Alabama Lunabotics Systems Engineering Paper

    NASA Technical Reports Server (NTRS)

    Baker, Justin; Ricks, Kenneth; Hull, Bethanne J.

    2012-01-01

    Excavation will hold a key role for future lunar missions. NASA has stated that "advances in lunar regolith mining have the potential to significantly contribute to our nation's space vision and NASA space exploration operations." [1]. The Lunabotics Mining Competition is an event hosted by NASA that is meant to encourage "the development of innovative lunar excavation concepts from universities which may result in clever ideas and solutions which could be applied to an actual lunar excavation device or payload." [2]. Teams entering the competition must "design and build a remote controlled or autonomous excavator, called a lunabot, that can collect and deposit a minimum of 10 kilograms of lunar simulant within 10 minutes." [2]. While excavation will play an important part in lunar missions, there will still be many other tasks that would benefit from robotic assistance. An excavator might not be as well suited for these tasks as other types of robots might be. For example a lightweight rover would do well with reconnaissance, and a mobile gripper arm would be fit for manipulation, while an excavator would be comparatively clumsy and slow in both cases. Even within the realm of excavation it would be beneficial to have different types of excavators for different tasks, as there are on Earth. The Alabama Lunabotics Team at the University of Alabama has made it their goal to not only design and build a robot that could compete in the Lunabotics Mining Competition, but would also be a multipurpose tool for future NASA missions. The 2010-2011 resulting robot was named the Modular Omnidirectional Lunar Excavator (MOLE). Using the Systems Engineering process and building off of two years of Lunabotics experience, the 20ll-2012 Alabama Lunabotics team (Team NASACAR) has improved the MOLE 1.0 design and optimized it for the 2012 Lunabotics Competition rules [I]. A CAD model of MOLE 2.0 can be seen below in Fig. 1.

  10. Flood of April 13, 1980, Mobile, Alabama

    USGS Publications Warehouse

    Hannum, Curtis H.; Nelson, George H.

    1980-01-01

    This report presents basic data collected during the flood of April 13, 1980, in Mobile, Alabama. The data consists of high-water marks, accumulative rainfall, peak discharge at local gaging stations, hydrographs of discharge and rainfall, and photographs at various locations taken during and immediately after the flood. The report presented in map-series and lists data that are readily usable by local planners and developers. During th afternoon of April 13, 1980, the National Weather Service at Mobile recorded a total of 10.4 inches of rainfall. Immediately after the flood approximately 60 to 70 percent of the roads in the Mobile area were impassable. (USGS)

  11. Trapping styles in Mississippi, Alabama Haynesville reservoirs

    SciTech Connect

    Sticker, E.E. )

    1994-04-11

    The Jurassic Haynesville formation of Mississippi and Alabama has historically been just another stratigraphic unit to be penetrated before the underlying Smackover-Norphlet potential could be evaluated. But with recent production tests at rates in excess of 3,000 b/d of oil and individual wells that have produced more than 3 million bbl of oil equivalent, assuming a 6 Mcf/bbl ratio, many operators have reclassified the objectives status of the Haynesville from secondary to primary. The paper describes the structure and stratigraphy, the simple anticline, a complexly faulted anticline, a salt-breached anticline, depositional termination, and production projections.

  12. 76 FR 48879 - Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Fish and Wildlife Service Draft Environmental Impact Statement for Alabama Beach Mouse General... endangered Alabama beach mouse (Peromyscus polionotus ammobates) in Baldwin County, Alabama. The GCP analyzes... availability of the proposed GCP and the dEIS. These documents analyze the take of the Alabama beach...

  13. Alabama Education News. Volume 31, Number 1, August-September 2007

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama," as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  14. 76 FR 43128 - Approval and Promulgation of Air Quality Implementation Plan; Alabama; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ..., the State of Alabama, through the Alabama Department of Environmental Management (ADEM), provided a..., the State of Alabama, through ADEM, provided a letter to EPA certifying that the Alabama SIP meets the... comments provided by ADEM, the North Carolina Department of Environment and Natural Resources, and...

  15. Alabama Education News. Volume 29, Number 1. August-September 2005

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2005-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about…

  16. Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Technical Reports Server (NTRS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-01-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  17. Parametric study of prospective early Commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Astrophysics Data System (ADS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-02-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  18. The North Alabama Lightning Warning Product

    NASA Technical Reports Server (NTRS)

    Buechler, Dennis E.; Blakeslee, R. J.; Stano, G. T.

    2009-01-01

    The North Alabama Lightning Mapping Array NALMA has been collecting total lightning data on storms in the Tennessee Valley region since 2001. Forecasters from nearby National Weather Service (NWS) offices have been ingesting this data for display with other AWIPS products. The current lightning product used by the offices is the lightning source density plot. The new product provides a probabalistic, short-term, graphical forecast of the probability of lightning activity occurring at 5 min intervals over the next 30 minutes . One of the uses of the current lightning source density product by the Huntsville National Weather Service Office is to identify areas of potential for cloud-to-ground flashes based on where LMA total lightning is occurring. This product quantifies that observation. The Lightning Warning Product is derived from total lightning observations from the Washington, D.C. (DCLMA) and North Alabama Lightning Mapping Arrays and cloud-to-ground lightning flashes detected by the National Lightning Detection Network (NLDN). Probability predictions are provided for both intracloud and cloud-to-ground flashes. The gridded product can be displayed on AWIPS workstations in a manner similar to that of the lightning source density product.

  19. Inventory of Alabama greenhouse gas emissions and sinks: 1990

    SciTech Connect

    Li, Chumeng; Herz, W.J.; Griffin, R.A.

    1996-12-31

    Greenhouse gas concentrations in the atmosphere have been increasing since the industrial revolution. Worldwide efforts are being made to study anthropogenic greenhouse gas emissions. This study quantified the anthropogenic greenhouse gas emissions in Alabama in 1990. Alabama anthropogenic greenhouse gas emissions and sinks from 13 sources were studied. 1990 Alabama total anthropogenic greenhouse gas emissions and sinks were estimated to be 153.42 and 21.66 million tons of carbon dioxide equivalent. As a result, the net total greenhouse gas emissions were estimated to be 131.76 million tons of carbon dioxide equivalent. Fossil fuel combustion is the major source of emissions, representing approximately 78 percent. Coal mining and landfills are other two significant emission sources, representing approximately 10 and 6 percent of the total emissions respectively. Forests in Alabama represent the major sink, offsetting approximately 14 percent of the total emissions. On a per capita basis, Alabama`s emission rate is 32.3 tons of carbon dioxide equivalent per capita in 1990, compared to the national per capita average of 23.4 tons of carbon dioxide equivalent. The high emission rate is attributed to higher emissions than the national average from fossil fuel combustion, from coal mining and landfills in Alabama.

  20. Carbon monoxide poisonings after two major hurricanes--Alabama and Texas, August-October 2005.

    PubMed

    2006-03-10

    Hurricanes Katrina and Rita struck the U.S. Gulf Coast on August 29, 2005, and September 24, 2005, respectively, causing widespread damage and leaving approximately 4 million households without electrical power. Despite public health measures to prevent carbon monoxide (CO) poisonings after major power outages, multiple CO poisonings were reported in Gulf Coast states in the wake of these hurricanes. The Alabama Department of Public Health and Texas Department of State Health Services asked CDC to assist in investigating the extent and causes of these hurricane-related CO poisonings. The investigation identified 27 incidents of CO poisoning resulting in 78 nonfatal cases and 10 deaths in hurricane-affected counties in Alabama and Texas, nearly all of which were caused by gasoline-powered generators. Most of the generators involved were placed outside but close to the home to power window air conditioners (ACs) or connect to central electric panels. Few homes had functioning CO detectors. CDC continues to recommend that generators be placed far from homes, away from window ACs, and that CO detectors be used by all households operating gasoline-powered appliances (e.g., generators and gas furnaces), with batteries replaced yearly. Although the risk for CO poisoning likely decreases as generators are placed further from the home, additional studies are needed to establish a safe distance for generator placement.

  1. Wealth of the world's richest publicly traded companies per industry and per employee: Gamma, Log-normal and Pareto power-law as universal distributions?

    NASA Astrophysics Data System (ADS)

    Soriano-Hernández, P.; del Castillo-Mussot, M.; Campirán-Chávez, I.; Montemayor-Aldrete, J. A.

    2017-04-01

    Forbes Magazine published its list of leading or strongest publicly-traded two thousand companies in the world (G-2000) based on four independent metrics: sales or revenues, profits, assets and market value. Every one of these wealth metrics yields particular information on the corporate size or wealth size of each firm. The G-2000 cumulative probability wealth distribution per employee (per capita) for all four metrics exhibits a two-class structure: quasi-exponential in the lower part, and a Pareto power-law in the higher part. These two-class structure per capita distributions are qualitatively similar to income and wealth distributions in many countries of the world, but the fraction of firms per employee within the high-class Pareto is about 49% in sales per employee, and 33% after averaging on the four metrics, whereas in countries the fraction of rich agents in the Pareto zone is less than 10%. The quasi-exponential zone can be adjusted by Gamma or Log-normal distributions. On the other hand, Forbes classifies the G-2000 firms in 82 different industries or economic activities. Within each industry, the wealth distribution per employee also follows a two-class structure, but when the aggregate wealth of firms in each industry for the four metrics is divided by the total number of employees in that industry, then the 82 points of the aggregate wealth distribution by industry per employee can be well adjusted by quasi-exponential curves for the four metrics.

  2. Geoscience research databases for coastal Alabama ecosystem management

    USGS Publications Warehouse

    Hummell, Richard L.

    1995-01-01

    Effective management of complex coastal ecosystems necessitates access to scientific knowledge that can be acquired through a multidisciplinary approach involving Federal and State scientists that take advantage of agency expertise and resources for the benefit of all participants working toward a set of common research and management goals. Cooperative geostatic investigations have led toward building databases of fundamental scientific knowledge that can be utilized to manage coastal Alabama's natural and future development. These databases have been used to assess the occurrence and economic potential of hard mineral resources in the Alabama EFZ, and to support oil spill contingency planning and environmental analysis for coastal Alabama.

  3. Alabama Institute for Deaf and Blind Biodiesel Project Green

    SciTech Connect

    Edmiston, Jessica L

    2012-09-28

    Through extensive collaboration, Alabama Institute for Deaf and Blind (AIDB) is Alabama's first educational entity to initiate a biodiesel public education, student training and production program, Project Green. With state and national replication potential, Project Green benefits local businesses and city infrastructures within a 120-mile radius; provides alternative education to Alabama school systems and to schools for the deaf and blind in Appalachian States; trains students with sensory and/or multiple disabilities in the acquisition and production of biodiesel; and educates the external public on alternative fuels benefits.

  4. 77 FR 42682 - Approval and Promulgation of Air Quality Implementation Plan; Alabama; Disapproval of 110(a)(2)(E...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ..., through the Alabama Department of Environmental Management (ADEM), on July 25, 2008, and on September 23... Alabama, through ADEM, provided submissions to EPA certifying that the Alabama SIP meets the requirements... 23, 2009, the State of Alabama, through ADEM, provided letters to EPA certifying that Alabama's...

  5. Installation Restoration Program. Preliminary Assessment: Alabama Army National Guard, Dannelly Field Municipal Airport, Montgomery, Alabama

    DTIC Science & Technology

    1990-02-01

    Soil Survey of Mo tqomery County, Alabama ( Burgess et al, 1960). Montgomery County has a humid, mild, almost subtropical climate. The average annual...Surficial slopes range from 1 to 3 percent ( Burgess et al, 1960). 111-6i I Figure 111.3 SCDTIR Source: Burgess et al, 1960 Soils Map of the Base and Dannelly...has characteristics similar to natural clay soils in adjacent areas ( Burgess et al, 1960). D. Hydrology 1. Surface Water The Base is located within

  6. Miocene marine shelf-bar and deltaic petroleum reservoirs of coastal Alabama and Mississippi/Alabama shelf

    SciTech Connect

    Mink, R.M.; Mancini, E.A.; Bearden, B.L.

    1989-03-01

    Middle and upper Miocene gas reservoirs found in coastal Alabama and the Mississippi/Alabama shelf are predominantly inner to middle neritic shelf-bar or deltaic sands. A Miocene delta system prograded from the west-northwest in offshore Louisiana-Mississippi into coastal Alabama and the Mississippi/Alabama shelf. Deltaic sedimentation primarily affected the western portion of the Mississippi/Alabama shelf, while neritic sedimentation predominated in the northeastern portion of the region in coastal Alabama. Basinal clays are prevalent in the southeastern portion of the Mississippi/Alabama shelf. The productive Miocene reservoir sands occur between depths of 1100 and 5100 ft and generally are from 10 to 200 ft thick. The quartz-rich sands range from fine to coarse grained and have subangular to rounded and moderately to well-sorted quartz grains. Reservoir porosity is primary intergranular and generally ranges from 21% to 35%, with permeabilities that may exceed 2000 md. The natural gas in these shallow reservoirs is primarily biogenic in origin. Productivity of the reservoirs is highly variable and is often characterized by high water saturation. Reservoir pressures, which generally range from 550 to 2300 psi, are also a major factor controlling productivity of these reservoirs. Middle Miocene reservoirs are most common in coastal Alabama, and upper Miocene reservoirs are most common in the Mississippi/Alabama shelf. Petroleum traps are principally sandstone porosity and permeability pinch-outs against regional dip with subtle closure and anticlinal nosing as secondary factors in many of the traps. These middle and upper Miocene gas sands are best delineated with relative amplitude seismic reflection data no which gas-charged sands are apparent as bright spots.

  7. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... supply company sells all of its electric energy, or as a transmission company provides all its transmission services to them or their customers (exclusive of any electric energy or transmission services... facilities for the generation or transmission of electric energy for sale to one or more electric...

  8. Topographic data of selected areas along the Alabama River near Montgomery, Alabama, collected using mobile terrestrial light detection and ranging (T-LiDAR) technology

    USGS Publications Warehouse

    Kimbrow, D.R.

    2014-01-01

    Topographic data at selected areas within the Alabama River flood plain near Montgomery, Alabama, were collected using a truck-mounted mobile terrestrial light detection and ranging system. These data were collected for inclusion in a flood inundation model developed by the National Weather Service in Birmingham, Alabama. Data are presented as ArcGIS point shapefiles with the extension .shp.

  9. Description and Status of the North Alabama Lightning Mapping Array

    NASA Technical Reports Server (NTRS)

    Blakeslee, Richard J.; Christian, Hugh J.; Bailey, Jeffrey C.; Buechler, Dennis E.; Hall, John M.; McCaul, Eugene W.; Stano, Geoffrey T.

    2011-01-01

    The North Alabama Lightning Mapping Array (LMA) is a network LMA detectors that detects and maps lightning using VHF radiation (TV Channel 5) in a region centered about Huntsville, Alabama that includes North Alabama, Central Tennessee and parts of Georgia and Mississippi. The North Alabama LMA has been in operation since late 2001, and has been providing real time data to regional National Weather Service (NSF) Weather Forecast Offices (WFOs) since mid 2003 through the NASA Short-term Prediction Research and Transition (SPoRT) center. Data from this network (as well as other from other LMA systems) are now being used to create proxy Geostationary Lightning Mapper (GLM) data sets for GOES-R risk reduction and algorithm development activities. In addition, since spring 2009 data are provided to the Storm Prediction Center in support of Hazardous Weather Testbed and GOES-R Proving Ground activities during the Spring Program. Description, status and plans will be discussed.

  10. 76 FR 62058 - Southcross Alabama Pipeline LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... September 28, 2011, Southcross Alabama Pipeline LLC (SAGS) submitted a revised Statement of Operating Conditions for services provided under Section 311 of the Natural Gas Policy Act of 1978 (``NGPA'')....

  11. 8. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11, N of Epes Southern RR. lift span, from SW. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  12. 11. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 N of Epes Southern RR. lift span, S tower. Sarcone Photography, Columbus, MS. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  13. 77 FR 29924 - Drawbridge Operation Regulation; Alabama River, AL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... modify the operating schedule that governs the Meridian and Bigbee Railroad (MNBR) swing span bridge.... C. Basis and Purpose The MNBR swing span bridge crosses the Alabama River at mile 205.9, at...

  14. Occurrence of the megatoothed sharks (Lamniformes: Otodontidae) in Alabama, USA

    PubMed Central

    Ebersole, Jun

    2014-01-01

    The Otodontidae include some of the largest sharks to ever live in the world’s oceans (i.e., Carcharocles megalodon). Here we report on Paleocene and Eocene occurrences of Otodus obliquus and Carcharocles auriculatus from Alabama, USA. Teeth of Otodus are rarely encountered in the Gulf Coastal Plain and this report is one of the first records for Alabama. Carcharocles auriculatus is more common in the Eocene deposits of Alabama, but its occurrence has been largely overlooked in the literature. We also refute the occurrence of the Oligocene Carcharocles angustidens in the state. Raised awareness and increased collecting of under-sampled geologic formations in Alabama will likely increase sample sizes of O. obliquus and C. auriculatus and also might unearth other otodontids, such as C. megalodon and C. chubutensis. PMID:25332848

  15. 76 FR 77995 - Southcross Alabama Pipeline LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... December 7, 2011, Southcross Alabama Pipeline LLC (SAP) submitted a revised Statement of Operating Conditions for services provided under Section 311 of the Natural Gas Policy Act of 1978 (``NGPA'')....

  16. Regional assessment of nonforestry related biomass resources: Alabama

    SciTech Connect

    Not Available

    1988-11-01

    This document is a collection of spreadsheets detailing on a county by county basis the agricultural crop, agricultural wastes, municipal wastes and industrial wastes of Alabama that are potential biomass energy sources.

  17. 46. LINED SECTION OF AQUEDUCT LOOKING NORTH TO ALABAMA HILLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. LINED SECTION OF AQUEDUCT LOOKING NORTH TO ALABAMA HILLS - Los Angeles Aqueduct, From Lee Vining Intake (Mammoth Lakes) to Van Norman Reservoir Complex (San Fernando Valley), Los Angeles, Los Angeles County, CA

  18. Investigation using data in Alabama from ERTS-A

    NASA Technical Reports Server (NTRS)

    Henry, H. R. (Principal Investigator)

    1972-01-01

    There are no author-identified significant results in this report. Brief summaries are presented of accomplishments by the state of Alabama in the areas of: (1) investigation of environmental factors; (2) land use compilation; (3) data processing for land use compilation; (4) photo-reproduction and unsupervised land use classification from digital tape; (5) data collection buoys; and (6) activities of the Geological Survey of Alabama.

  19. Borrelia lonestari DNA in adult Amblyomma americanum ticks, Alabama.

    PubMed Central

    Burkot, T. R.; Mullen, G. R.; Anderson, R.; Schneider, B. S.; Happ, C. M.; Zeidner, N. S.

    2001-01-01

    Polymerase chain reaction analysis of 204 Amblyomma americanum and 28 A. maculatum ticks collected in August 1999 near the homes of patients with southern tick-associated rash illness and in control areas in Choctaw County, Alabama, showed Borrelia lonestari flagellin gene sequence from two adult A. americanum. The presence of B. lonestari in A. americanum ticks from Alabama suggests that this suspected pathogen may be widespread in the southeastern United States. PMID:11384533

  20. GOMEX08 - High Frequency Acoustic Propagation over the Alabama Alps

    DTIC Science & Technology

    2010-06-01

    of a group of reef -like structures collectively known as the Pinnacles . In particular, the Alabama Alps rises to about 15-17m above a relatively...the general area of the Pinnacles and the specific Ala- bama Alps experimental site of this paper. The Alabama Alps region (Fig. 1, lower left) was...chosen for its simplicity as compared with the Scamp Reef region (Fig. 1, upper right). The experimental geometry at the Alps is overlaid on the

  1. 76 FR 9320 - Endangered and Threatened Wildlife; 90-Day Finding on a Petition To List Alabama Shad as...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... Alabama shad have experienced widespread declines because of loss of habitat to dams, rapid urbanization... to rapid urbanization and pollution has contributed to the widespread declines in Alabama...

  2. Assessment of Applicable or Relevant and Appropriate Requirements (ARARS) for Alabama Army Ammunition Plant, Alabama

    DTIC Science & Technology

    2007-11-02

    dinitrophenol - 0.61 ppm, • nitrobenzene - 0.073 ppm, • phenol - 1.4 ppm, and • cyanides - 2.7 ppm. 2.3.4 On-Site Incineration/Groundwater Treatment ...2.3.2 Off-site alternatives 18 2.3.3 On-site landfill/groundwater treatment alternative ... 35 2.3.4 On-site incineration/groundwater treatment ...Action-specific potential ARARs for Alabama Army Ammunition Plant. Alternative 2: On-site landfill/groundwater treatment 36 Table 6. Action

  3. Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Alabama

    SciTech Connect

    Mendon, Vrushali V.; Zhao, Mingjie; Taylor, Zachary T.; Poehlman, Eric A.

    2016-02-15

    The 2015 IECC provides cost-effective savings for residential buildings in Alabama. Moving to the 2015 IECC from the 2009 IECC base code is cost-effective for residential buildings in all climate zones in Alabama.

  4. 75 FR 57412 - Approval and Promulgation of Implementation Plans Alabama: Volatile Organic Compounds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans Alabama: Volatile Organic... ``volatile organic compounds'' (VOCs) found at Alabama Administrative Code section...

  5. E3 Success Story - Transforming and Promoting Sustainable Manufacturing in Alabama

    EPA Pesticide Factsheets

    Alabama E3 is expanding to other manufacturing sectors and expanding its scope. Alabama E3 now includes a workforce training and education component and is also developing a new innovation engineering green module that focuses on improving sustainability

  6. 77 FR 31001 - Southern Natural Gas Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Natural Gas Company, L.L.C. (SNG) in Calhoun and Cleburne Counties, Alabama. The Commission will use this... this notice, and you are contacted by a representative of SNG about the acquisition of an easement to... determined in accordance with state law. SNG provided landowners with a fact sheet prepared by the...

  7. Geology of the Huntsville quadrangle, Alabama

    USGS Publications Warehouse

    Sanford, T.H.; Malmberg, G.T.; West, L.R.

    1961-01-01

    The 7 1/2-minute Huntsville quadrangle is in south-central Madison County, Ala., and includes part of the city of Hunstville. The south, north, east, and west boundaries of the quadrangle are about 3 miles north of the Tennessee River, 15 1/2 miles south of the Tennessee line, 8 miles west of the Jackson County line, and 9 miles east of the Limestone County line. The bedrock geology of the Huntsville quadrangle was mapped by the U.S. Geological Survey in cooperation with the city of Hunstville and the Geological Survey of Alabama as part of a detailed study of the geology and ground-water resources of Madison County, with special reference to the Huntsville area. G. T. Malmberg began the geologic mapping of the county in July 1953, and completed it in April 1954. T. H. Sanford, Jr., assisted Malmberg in the final phases of the county mapping, which included measuring geologic sections with hand level and steel tape. In November 1958 Sanford, assisted by L. R. West, checked contacts and elevations in the Hunstville quadrangle; made revisions in the contact lines; and wrote the text for this report. The fieldwork for this report was completed in April 1959.

  8. Sedimentation profiles in Lake Tuscaloosa, Alabama, 2000

    USGS Publications Warehouse

    Stricklin, Victor E.

    2001-01-01

    Lake Tuscaloosa, created in 1969 by the impoundment of North River, is the primary water supply for the cities of Tuscaloosa and Northport, Alabama, and surrounding areas. In 1982, 17 cross-sections were established in the principal tributaries of the lake, which include North River, Dry Creek, Turkey Creek, Binion Creek, Tierce Creek, Carroll Creek, and Brush Creek. These cross-sections were resurveyed in 1986 to determine the amount of sedimentation or scour occurring in the lake at these areas. In May 2000, 14 of the 17 cross-sections were located for resurveying to determine the amount of sedimentation or scour since 1986. The maximum amount of sediment deposition determined from the 2000 survey occurred in the upper end of the Carroll Creek tributary at cross-section CC8 (3.0 feet). The maximum amount of scour occurred in the Turkey Creek tributary at cross-section TRC2 (7.0 feet). Of the 14 cross-sections, 6 indicated increased amounts of sediment deposition, 5 indicated scouring of bottom sediments, and 3 indicated little or no change.

  9. Geocoding and social marketing in Alabama's cancer prevention programs.

    PubMed

    Miner, Julianna W; White, Arica; Lubenow, Anne E; Palmer, Sally

    2005-11-01

    The Alabama Department of Public Health (ADPH) is collaborating with the National Cancer Institute to develop detailed profiles of underserved Alabama communities most at risk for cancer. These profiles will be combined with geocoded data to create a pilot project, Cancer Prevention for Alabama's Underserved Populations: A Focused Approach. The project's objectives are to provide the ADPH's cancer prevention programs with a more accurate and cost-effective means of planning, implementing, and evaluating its prevention activities in an outcomes-oriented and population-appropriate manner. The project links geocoded data from the Alabama Statewide Cancer Registry with profiles generated by the National Cancer Institute's cancer profiling system, Consumer Health Profiles. These profiles have been successfully applied to market-focused cancer prevention messages across the United States. The ADPH and the National Cancer Institute will evaluate the efficacy of using geocoded data and lifestyle segmentation information in strategy development and program implementation. Alabama is the first state in the nation not only to link geocoded cancer registry data with lifestyle segmentation data but also to use the National Cancer Institute's profiles and methodology in combination with actual state data.

  10. 77 FR 36274 - Public Water System Supervision Program Revision for the State of Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... of Alabama is revising its approved Public Water System Supervision Program. Alabama has adopted the following rules: Long Term 1 Enhanced Surface Water Treatment Rule, Long Term 2 Enhanced Surface Water... AGENCY Public Water System Supervision Program Revision for the State of Alabama AGENCY:...

  11. 77 FR 124 - Biological Processors of Alabama; Decatur, Morgan County, AL; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    .... ADDRESSES: Copies of the settlement are available from Ms. Paula V. Painter. Submit your comments by Site name Biological Processors of Alabama Superfund Site by one of the following methods: www.epa.gov... Biological Processors of Alabama Superfund Site located in Decatur, Morgan County, Alabama. DATES: The...

  12. State Plan for Alabama Higher Education, 2003-04 to 2008-09.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    The State Plan for Alabama Higher Education is intended to focus public attention on important strategic issues facing Alabama higher education and the state and to articulate Alabamas needs and its vision for higher education. It is designed to commit resources necessary to provide high quality teaching, scholarship, research, and public service…

  13. Opening the Schoolhouse Doors: Tax Credits and Educational Access in Alabama

    ERIC Educational Resources Information Center

    Carpenter, Dick M., II.; Erickson, Angela C.

    2014-01-01

    In 2013, Alabama adopted the Alabama Accountability Act, an education reform measure that includes two new school choice programs that extend a lifeline to Alabama students trapped in failing public schools. One program offers a tax credit to help offset the cost of tuition for families who move their children from public schools designated as…

  14. Today's Students, Tomorrow's Citizens: Pathways for Learning, Science. Alabama High School Graduation Exam.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery. Div. of Instructional Services.

    This document introduces the Alabama Graduation Examination Program (AGEP) which provides learning opportunities for high school students to meet the minimum competency requirements to earn a high school diploma in the state of Alabama. The Alabama High School Graduation Examination (AHSGE) content includes the subject areas of reading…

  15. Alabama Education Report Card for the 2014-2015 School Year

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2016

    2016-01-01

    This 2014-2015 "Alabama Education Report Card" includes a wide variety of data and financial information that, when taken together, provides a holistic picture of the world of K-12 education in the state of Alabama and is committed to academic excellence which provides education of the highest quality to all Alabama students, preparing…

  16. Blacks in Alabama; A Study of Selected Characteristics: Population, Place of Residence, Sex, Age.

    ERIC Educational Resources Information Center

    Jones, Alice; Diener, Thomas

    Using 1970 Federal Census data, this paper analyzes selected characteristics of the black population in Alabama, focusing on the following categories: (1) blacks in Alabama counties; (2) urban and rural blacks; and (3) blacks in Alabama by sex and age. Special emphasis is placed on producing and interpreting data by which postsecondary education…

  17. Evaluation of Alabama Public School Wellness Policies and State School Mandate Implementation

    ERIC Educational Resources Information Center

    Gaines, Alisha B.; Lonis-Shumate, Steven R.; Gropper, Sareen S.

    2011-01-01

    Background: This study evaluated wellness policies created by Alabama public school districts and progress made in the implementation of Alabama State Department of Education (ALSDE) school food and nutrition mandates. Methods: Wellness policies from Alabama public school districts were compared to minimum requirements under the Child Nutrition…

  18. Alabama's Cullars Rotation: The Oldest, Continuous Soil Fertility Experiment in the South

    Technology Transfer Automated Retrieval System (TEKTRAN)

    In 1911, Alabama Agricultural and Experiment Station at Alabama Polytechnic Institute (now Auburn University) received state funding to conduct fertilizer experiments on farmers' fields throughout Alabama. One of those fields was near Auburn on the farm of J.A. Cullars. Today, the “Cullars Rotation”...

  19. 76 FR 4588 - Approval and Promulgation of Air Quality Implementation Plan; Alabama; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... the Alabama Department of Environmental Management (ADEM), provided a letter to EPA with certification... is EPA proposing in today's notice? On September 23, 2009, the State of Alabama, through ADEM...)(I) for the 2006 24-hour PM 2.5 NAAQS? On September 23, 2009, the State of Alabama, through...

  20. 76 FR 72495 - Alabama Metal Coil Securement Act; Petition for Determination of Preemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... Administration [Docket No. FMCSA-2011-0318] Alabama Metal Coil Securement Act; Petition for Determination of... that the State of Alabama's Metal Coil Securement Act is preempted by Federal law. FMCSA requests comments on what effect, if any, Alabama's metal coil load securement certification requirements may...

  1. Effectiveness of Inquiry Based and Teacher Directed Instruction in an Alabama Elementary School

    ERIC Educational Resources Information Center

    Taylor, Joanna; Bilbrey, Jerry

    2012-01-01

    This research analyzed the teacher-directed instruction against the effectiveness of inquiry-based instruction at a subject school in Alabama for 5th grade science and mathematics. The Alabama school changed the science and mathematics curriculum for a period of 3 years and in the process became an Alabama Math, Science and Technology (AMSTI)…

  2. Magnitude and Frequency of Floods in Alabama, 2003

    USGS Publications Warehouse

    Hedgecock, T.S.; Feaster, Toby D.

    2007-01-01

    Methods of estimating flood magnitudes for recurrence intervals of 1.5, 2, 5, 10, 25, 50, 100, 200, and 500 years have been developed for rural streams in Alabama that are not affected by regulation or urbanization. Regression relations were developed using generalized least-squares regression techniques to estimate flood magnitude and frequency on ungaged streams as a function of the basin drainage area. These methods are based on flood-frequency characteristics for 169 gaging stations in Alabama and 47 gaging stations in adjacent states having 10 or more years of record through September 2003. Graphical relations of peak flows to drainage areas are presented for sites along the Alabama, Coosa, Tallapoosa, Tennessee, Tombigbee, and Black Warrior Rivers. Equations that account for drainage area and percentage of impervious cover as independent variables also are provided for estimating flood magnitudes on ungaged urban streams (taken from a previous report).

  3. Geomorphology of coastal sand dunes, Baldwin County, Alabama

    USGS Publications Warehouse

    Bearden, Bennett L.; Hummell, Richard L.; Mink, Robert M.

    1989-01-01

    Alabama's coastal eolian deposits are primarily vegetated dunes that are exemplified by sand ridges with flat to undulating upper surfaces and continuous irregular crests. Dune fields occur along Morgan peninsula between the foredune line and Little Lagoon and the Mobile Bay area. These dune fields consist primarily of one or more continuous ridges that parallel the coast and are generally vegetaed to grassy. Washover of the beach and backshore during Hurricane Frederic (1979) and subsequent smaller scale storms resulted in significant erosion of many of Alabama's dune fields. The primary dunes or foredunes are beginning to recover from the effects of these storms; however, numerous breaks in the primary dune line are present. Sand dunes in coastal Alabama provide protection against storm-generated waves and washover. The foredunes are protected by adherence to a Coastal Construction Control Line (CCCL) or construction setback line identified by markers along coastal Baldwin County.

  4. Current water resources activities in Alabama, fiscal year 1986

    USGS Publications Warehouse

    Slack, L.J.; Meadows, E.A.

    1986-01-01

    The purpose of this report is to describe the current (as of 1986) water resources activities of the U.S. Geological Survey in Alabama. The responsibilities and objectives of the Survey; organization of the Alabama District; sources of funding; current projects; hydrologic data program; and a selected bibliography of hydrologic reports are presented. Water resources projects are undertaken usually at the request of and with partial funding from another agency, provided: they are high priority problems and generally identified to fall within the mission of the Water Resources Division and they are consistent with the Program Management Plan developed by the Water Resources Division in Alabama to meet the long range plan for hydrologic data in the State. (USGS)

  5. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  6. ATM Coastal Topography-Alabama 2001

    USGS Publications Warehouse

    Nayegandhi, Amar; Yates, Xan; Brock, John C.; Sallenger, A.H.; Bonisteel, Jamie M.; Klipp, Emily S.; Wright, C. Wayne

    2009-01-01

    These remotely sensed, geographically referenced elevation measurements of Lidar-derived first surface (FS) topography were produced collaboratively by the U.S. Geological Survey (USGS), Florida Integrated Science Center (FISC), St. Petersburg, FL, and the National Aeronautics and Space Administration (NASA), Wallops Flight Facility, VA. This project provides highly detailed and accurate datasets of the Alabama coastline, acquired October 3-4, 2001. The datasets are made available for use as a management tool to research scientists and natural resource managers. An innovative scanning Lidar instrument originally developed by NASA, and known as the Airborne Topographic Mapper (ATM), was used during data acquisition. The ATM system is a scanning Lidar system that measures high-resolution topography of the land surface, and incorporates a green-wavelength laser operating at pulse rates of 2 to 10 kilohertz. Measurements from the laser ranging device are coupled with data acquired from inertial navigation system (INS) attitude sensors and differentially corrected global positioning system (GPS) receivers to measure topography of the surface at accuracies of +/-15 centimeters. The nominal ATM platform is a Twin Otter or P-3 Orion aircraft, but the instrument may be deployed on a range of light aircraft. Elevation measurements were collected over the survey area using the ATM system, and the resulting data were then processed using the Airborne Lidar Processing System (ALPS), a custom-built processing system developed in a NASA-USGS collaboration. ALPS supports the exploration and processing of Lidar data in an interactive or batch mode. Modules for pre-survey flight line definition, flight path plotting, Lidar raster and waveform investigation, and digital camera image playback have been developed. Processing algorithms have been developed to extract the range to the first and last significant return within each waveform. ALPS is routinely used to create maps that

  7. 18 CFR 367.14 - Transactions with associate companies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... associate companies. 367.14 Section 367.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  8. 18 CFR 367.1010 - Account 101, Service company property.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... company property. 367.1010 Section 367.1010 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  9. 18 CFR 367.14 - Transactions with associate companies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... associate companies. 367.14 Section 367.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  10. 18 CFR 367.1010 - Account 101, Service company property.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... company property. 367.1010 Section 367.1010 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  11. 18 CFR 367.14 - Transactions with associate companies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... associate companies. 367.14 Section 367.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  12. 18 CFR 367.14 - Transactions with associate companies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... associate companies. 367.14 Section 367.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  13. 18 CFR 367.1010 - Account 101, Service company property.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... company property. 367.1010 Section 367.1010 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  14. 18 CFR 367.1010 - Account 101, Service company property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... company property. 367.1010 Section 367.1010 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  15. 18 CFR 367.1010 - Account 101, Service company property.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... company property. 367.1010 Section 367.1010 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  16. 18 CFR 367.14 - Transactions with associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... associate companies. 367.14 Section 367.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES...

  17. Perception of Alabama Science and Career Technology Teachers Concerning Teaching the Alabama Aquaculture Course of Study

    NASA Astrophysics Data System (ADS)

    Cline, David John

    The purpose of this study was to improve teachers' ability to effectively use aquaculture as a tool to teach math and science. The study population included Alabama science and career tech teachers that were certified to teach the Alabama aquaculture course of study. The teachers were electronically surveyed regarding their perceptions of the importance of the aquascience elective and aquaculture science course content standards, their knowledge of those topics and how they perceived the quality of available teaching materials. While all of the content standards were rated above average in importance, aquaculture career awareness and safety concerns were rated the highest by teachers. Teachers were most knowledgeable about career opportunities, categorization of aquaculture species, and the adaptations of aquatic organisms. The average materials ratings were below average for all content standards. The highest rated materials were for career opportunities, categorization of species and safety topics. Using Borich's (1980) model of mean weighted discrepancy scores, the control of diseases and pests in the aquatic environment and concepts associated with health management of aquacrops were identified as top priorities for in-service teacher training. Aquaculture industry infrastructure and the effects of the fishing industry were also identified as priority training topics. Teachers were self-divided into 3 categories those that taught science (SCI), career tech (CTE) and those that taught both (BOTH). They were further divided by their level of experience. A multivariate analysis of variance (MANOVA) revealed a significant effect between teacher types but there was no significant interaction effect between (a) teacher type and experience level or (b) the two levels of experience. A follow-up analysis of variance (ANOVA) indicated that the science teachers thought significantly less of the available materials than either the CTE or BOTH groups.

  18. Cultural Resources Survey of Mobile Harbor, Alabama.

    DTIC Science & Technology

    1983-01-01

    6e List of Plates 1. Three masted barks loading coal and lumber. .. .......... 39 2. Steamboat LOUIS D’OLIVE .. ........... ......... 44 3. Bay ferry...BAY QUEEN .. .......... ............ 47 4. Steamer JOHN QUILL. .. .......... ............ 48 5. Three and four masted schooners at Mobile...similar charter was granted to John Law and the "Company of the West." Law’s efforts to promote the commerce of the colony were more successful than

  19. Power

    SciTech Connect

    1999-10-01

    Subjects covered in this section are: (1) CP and L, Florida Progress to create new company through merger; (2) Violations are color-coded under new NRC enforcement policy; (3) NRC confirms that nuclear plants are Y2K ready; (4) NIRS denied NRC ruling; (5) NRC to allow lower insurance coverage on shutdown TMI-2; (6) NRC look to change noncombustibility regulation; and (7) Electronic NRC reading room scheduled to open.

  20. 3. VIEW OF EAST SIDE OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW OF EAST SIDE OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2 HOUSE LOOKING WEST. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  1. 2. VIEW OF WEST SIDE OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF WEST SIDE OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2 HOUSE, LOOKING EAST. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  2. 7. VIEW OF INTERIOR WALL OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF INTERIOR WALL OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2. HOUSE, LOOKING NORTHEAST. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  3. 1. VIEW OF SOUTH SIDE OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SOUTH SIDE OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2 HOUSE, LOOKING NORTH. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  4. 8. VIEW OF INTERIOR WALL OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF INTERIOR WALL OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2. HOUSE, LOOKING EAST. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  5. 4. VIEW OF SOUTH SIDE OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW OF SOUTH SIDE OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2 HOUSE LOOKING SOUTH. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  6. 6. VIEW OF INTERIOR WALL OF SARATOGA GAS LIGHT COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF INTERIOR WALL OF SARATOGA GAS LIGHT COMPANY GASHOLDER NO. 2 HOUSE, LOOKING NORTH. - Saratoga Gas Light Company, Gasholder No. 2, Niagara Mohawk Power Corporation Substation Facility, intersection of Excelsior & East Avenues, Saratoga Springs, NY

  7. SOUTHERN DUCTILE CASTING COMPANY, BACK SIDE OF FURNACE AND MOLDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTHERN DUCTILE CASTING COMPANY, BACK SIDE OF FURNACE AND MOLDING BUILDINGS SHOWING CONNECTIONS TO LOCAL POWER GRID, PRIMARILY FOR ELECTRIC FURNACES. - Southern Ductile Casting Company, Bessemer Foundry, 2217 Carolina Avenue, Bessemer, Jefferson County, AL

  8. Alabama Commission on Higher Education. Annual Report, 1993-94.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    This annual report of the Alabama Commission on Higher Education describes new academic programs approved, allied health programs, off-campus instruction, computer-based articulation, rising junior exam, the Academic Common Market, educational technologies, Governor's Conference on Higher Education, Eminent Scholars Program, Meharry Medical…

  9. Alabama Commission on Higher Education. Annual Report 1987-88.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    Activities of the Alabama State Commission on Higher Education are described. Three sections discuss the following: (1) planning and coordination activities (unified budget recommendation, statewide planning process, research and service program inventory, new program approval, off-campus instruction, non-resident institutional review, conference…

  10. Laboratory Safety Manual for Alabama Schools. Bulletin 1975. No. 20.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This document presents the Alabama State Department of Education guidelines for science laboratory safety, equipment, storage, chemical safety, rocket safety, electrical safety, safety with radioisotopes, and safety with biologicals. Also included is a brief bibliography, a teacher's checklist, a listing of laser facts and regulations, and a…

  11. Back to the Basics: Birmingham, Alabama, Measurement and Scale

    ERIC Educational Resources Information Center

    Handley, Lawrence R.; Lockwood, Catherine M.; Handley, Nathan

    2005-01-01

    "Back to the Basics: Birmingham, Alabama" is the fourth in a series of workshops that focus on teaching foundational map reading and spatial differentiation skills. It is the second published exercise from the Back to the Basics series developed by the Wetland Education through Maps and Aerial Photography (WETMAAP) Program (see…

  12. 12. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 N of Epes Southern RR. lift span, wide angle side view from SE. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  13. 9. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 N of Epes Southern RR. lift span, view from S approach. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  14. 10. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 of Epes Wouthern RR. lift span, wide=angle view from SW. bank. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  15. The Evolution of Cooperative Collection Development in Alabama Academic Libraries.

    ERIC Educational Resources Information Center

    Medina, Sue O.

    1992-01-01

    Describes a cooperative collection development program implemented by the Network of Alabama Academic Libraries (NAAL) to strengthen resources available for graduate education and research. Topics discussed include funding collection development, the formula for the equitable distribution of funds, research support, and other related activities.…

  16. Social Studies. Alabama Course of Study. Bulletin 1998, No. 18.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This curriculum guide defines social studies as the integrated study of the social sciences and humanities to promote civic competence. A framework for the K-12 social studies program in Alabama's public schools is provided. The curriculum emphasis on civic responsibility will encourage students to become informed, responsible, participating…

  17. 76 FR 34121 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 7. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State of...

  18. 76 FR 33805 - Alabama Disaster Number AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Amendment 3. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  19. 75 FR 27844 - Alabama Disaster Number AL-00031

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... [Federal Register Volume 75, Number 95 (Tuesday, May 18, 2010)] [Notices] [Pages 27844-27845] [FR Doc No: 2010-11744] SMALL BUSINESS ADMINISTRATION [Disaster Declaration 12157 and 12158] Alabama Disaster Number AL-00031 AGENCY: Small Business Administration. ACTION: Amendment 1. SUMMARY: This is...

  20. 76 FR 34121 - Alabama Disaster Number AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Amendment 4. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  1. 76 FR 31388 - Alabama Disaster Number AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Amendment 2. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  2. 76 FR 27140 - ALABAMA Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION ALABAMA Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 1. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State of...

  3. 77 FR 8942 - Alabama Disaster Number AL-00040

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00040 AGENCY: U.S. Small Business Administration. ACTION: Amendment 1. SUMMARY: This is an amendment of the Presidential declaration of a major ] disaster for the State...

  4. 76 FR 38264 - Alabama Disaster Number AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Amendment 5. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  5. 76 FR 28842 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Disaster Declaration 12545 and 12546 Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 6. SUMMARY: This is an amendment of the Presidential declaration of a...

  6. 76 FR 27140 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 3. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State of...

  7. 76 FR 39149 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 9. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State of...

  8. 76 FR 27741 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... From the Federal Register Online via the Government Publishing Office ] SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 4. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State of...

  9. 75 FR 27846 - Alabama Disaster Number AL-00029

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... [Federal Register Volume 75, Number 95 (Tuesday, May 18, 2010)] [Notices] [Pages 27846-27847] [FR Doc No: 2010-11745] SMALL BUSINESS ADMINISTRATION [Disaster Declaration 12155 and 12156] Alabama Disaster Number AL-00029 AGENCY: U.S. Small Business Administration. ACTION: Amendment 1. SUMMARY: This...

  10. 76 FR 30225 - Alabama Disaster Number AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Amendment 1. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  11. 75 FR 2896 - Alabama Disaster Number AL-00028

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00028 AGENCY: U.S. Small Business Administration. ACTION: Amendment 1. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  12. 76 FR 33805 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 8. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State...

  13. 76 FR 27740 - Alabama Disaster Number AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Amendment 5. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for the State of...

  14. 77 FR 63410 - Alabama Disaster Number AL-00044

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00044 AGENCY: U.S. Small Business Administration. ACTION: Amendment 1. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  15. National Environmental/Energy Workforce Assessment for Alabama.

    ERIC Educational Resources Information Center

    National Field Research Center Inc., Iowa City, IA.

    This report presents existing workforce levels, training programs and career potentials and develops staffing level projections (1976-1982) based on available information for the State of Alabama. The study concerns itself with the environmental pollution control areas of air, noise, potable water, pesticides, radiation, solid waste, wastewater,…

  16. Estimating flood hydrographs and volumes for Alabama streams

    USGS Publications Warehouse

    Olin, D.A.; Atkins, J.B.

    1988-01-01

    The hydraulic design of highway drainage structures involves an evaluation of the effect of the proposed highway structures on lives, property, and stream stability. Flood hydrographs and associated flood volumes are useful tools in evaluating these effects. For design purposes, the Alabama Highway Department needs information on flood hydrographs and volumes associated with flood peaks of specific recurrence intervals (design floods) at proposed or existing bridge crossings. This report will provide the engineer with a method to estimate flood hydrographs, volumes, and lagtimes for rural and urban streams in Alabama with drainage areas less than 500 sq mi. Existing computer programs and methods to estimate flood hydrographs and volumes for ungaged streams have been developed in Georgia. These computer programs and methods were applied to streams in Alabama. The report gives detailed instructions on how to estimate flood hydrographs for ungaged rural or urban streams in Alabama with drainage areas less than 500 sq mi, without significant in-channel storage or regulations. (USGS)

  17. Psychometric Properties of the Alabama Parenting Questionnaire-Preschool Revision

    ERIC Educational Resources Information Center

    Clerkin, Suzanne M.; Marks, David J.; Policaro, Katia L.; Halperin, Jeffrey M.

    2007-01-01

    The psychometric properties of the Alabama Parenting Questionnaire-Preschool Revision (APQ-PR) were explored in a sample of hyperactive-inattentive preschool children (N = 47) and nonimpaired controls (N = 113). A subset of parents completed the questionnaire on 2 occasions, approximately 1 year apart. Factor analysis revealed a 3-factor solution,…

  18. Alabama and the Southern Regional Education Board, December 2014

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2014

    2014-01-01

    This report details Alabama's participation in Southern Regional Education Board (SREB) programs and services from December 2013 through November 2014. Appropriations from member states support SREB's core operations and general services. SREB leverages the long-standing commitment of member states to attract external funding for an array of…

  19. Smoking, Sociodemographic Determinants, and Stress in the Alabama Black Belt

    ERIC Educational Resources Information Center

    Shuaib, Faisal; Foushee, H. R.; Ehiri, John; Bagchi, Suparna; Baumann, Angela; Kohler, Connie

    2011-01-01

    Purpose: In the Alabama Black Belt, poverty is high, and the educational level is low. Studies have found increased tobacco use among individuals exposed to high levels of stress. Few studies have been conducted in this region to measure smoking status, its sociodemographic determinants, and how smoking status relates to stressful environmental…

  20. Survey of Sampled Higher Education Institutions in Alabama.

    ERIC Educational Resources Information Center

    Nix, Thomas; Snyder, Scott; Fritschi, Jennifer

    This survey examined the extent of implementation of technology standards into Alabama preservice teacher education programs Researchers identified five graduate and five undergraduate education programs with the highest enrollments at the 15 higher education institutions affiliated with the ALAPT3 project. Contacts at 10 of the schools of…

  1. Alabama School Board Presidents' Perceptions of Community Engagement

    ERIC Educational Resources Information Center

    Starnes, Tammy Hallman

    2010-01-01

    The purpose of this study was to examine the perceptions of Alabama School Board Presidents about community engagement in school board decision making. An exploratory research design was used and data were collected by survey. The survey was mailed to 128 school board presidents representing the 128 school districts statewide (as of 2006). Sixty…

  2. Alabama Community College Presidents' Perceptions regarding Distance Education

    ERIC Educational Resources Information Center

    Nobles, Janina LaKeshea

    2010-01-01

    The purpose of this study was to examine Alabama community college presidents' perceptions regarding distance education. Further, this study was intended to determine the adequacy of the training opportunities and support for faculty that teach distance education courses and what services are available for distance education students. This study…

  3. Profile of State High School Exit Exam Policies. Alabama

    ERIC Educational Resources Information Center

    Center on Education Policy, 2011

    2011-01-01

    This individual profile provides information on Alabama's high school exit exam standards and policies. Some of the categories presented include: (1) State exit exam policy; (2) Type of Test; (3) Purpose; (4) Major changes in exit exam policy since the 2009-10 school year for financial reasons; (5) Subjects tested on exam; (6) Grade exam first…

  4. Profile of State College Entrance Exam Policies. Alabama

    ERIC Educational Resources Information Center

    Center on Education Policy, 2011

    2011-01-01

    This individual profile provides information on Alabama's college entrance exam standards and polices. Some of the categories presented include: (1) College entrance exam policy; (2) Purpose; (3) Major changes in college entrance exam policy since the 2009-10 school year for financial reasons; (4) Preparation state offers to students taking…

  5. An Analysis of Optometric Practices in Rural Alabama.

    ERIC Educational Resources Information Center

    Wild, Bradford W.; Maisiak, Richard

    1981-01-01

    Twenty-nine Alabama optometric practices were studied using an optometrist survey, one-week patient flow analysis, and audit of patient records. Results indicate some special facets of the rural practices that may require a different kind of educational preparation. (MSE)

  6. Retention Issues: A Study of Alabama Special Education Teachers

    ERIC Educational Resources Information Center

    Plash, Shawn; Piotrowski, Chris

    2006-01-01

    This study investigated issues that impact attrition, migration and retention of special education teachers in Alabama. The sample comprised 70 teachers designated as "highly-qualified" who responded to a job satisfaction instrument, with a focus on retention issues, developed by Levine (2001). The results indicated that the major…

  7. Language Arts. Alabama Course of Study. Bulletin 1987, No. 57.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    Developed by classroom teachers, instructional supervisors, school administrators, and personnel from institutions of higher education, this course of study guide outlines the language arts skills and concepts to be taught at each grade level (K-12) in Alabama schools. It is intended as a content outline to be used in planning the language arts…

  8. Agribusiness Education. Alabama Course of Study. Bulletin 1990, No. 60.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This course of study provides a framework for the content of a program in agribusiness education as part of the Alabama vocational education program. The course of study was designed to assist educators in developing and maintaining high quality vocational programs and to ensure uniformity of vocational programs. Following a description of the…

  9. Parables and Politics: Clergy Attitudes toward Illegal Immigration in Alabama

    ERIC Educational Resources Information Center

    Wickersham, Mary Eleanor

    2013-01-01

    The passage of a stringent immigration law in Alabama in 2011 makes relevant the juxtaposition of clergy and congregant attitudes and behaviors toward illegal immigrants as related to Biblical teachings that require charity to aliens. In order to examine the relationship between religious attitudes and illegal immigration, approximately 426…

  10. Foraminifera from Paleocene Clayton Formation lithostratotype, Barbour Count, Alabama

    SciTech Connect

    Fluegeman, R.H. Jr.

    1986-05-01

    A detailed search of the Clayton lithostratotype for microfossils has produced the first significant foraminifera fauna from the section and only the second occurrence of foraminifera in the Clayton Formation in eastern Alabama. The fauna is well preserved, but low in abundance and diversity; all assemblages are dominated by species of Anomalinoides. No planktonic species were identified in the studied samples. The benthic assemblages bear little resemblance to the more diverse foraminifera faunas of the Pine Barren and McBryde Members of the Clayton in western Alabama. The fauna from the Clayton lithostratotype closely resembles an assemblage collected from a sand unit within the middle part of the Porters Creek Formation of Butler County, Alabama. Biostratigraphic information is presently unavailable for the Clayton Formation in eastern Alabama; therefore, the authors cannot determine whether the Clayton and Porters Creek are time-equivalent units. However, occurrences of like foraminiferal assemblages imply equivalent paleoecologic conditions, and similarities in lithology are found between the Clayton Formation at its stratotype and the Porters Creek in Butler County, both of which indicate that both units represent the same depositional aspect of the early Paleocene transgressive-regressive cycle.

  11. Marketing Education. Alabama Course of Study. Bulletin 1996, No. 19.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This guide, which is intended for classroom teachers, supervisors, and administrators throughout Alabama, contains the minimum required content (core program) for public school instruction in marketing education in grades 7-12. Presented first are the following: introduction examining the mission, purpose, goals, and structure of marketing…

  12. Alternative N sources for corn and cotton in Alabama

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Because of high fertilizer N prices, growers are interested in using less expensive sources of N and using fertilizer additives to reduce ammonia volatilization losses from urea sources. An experiment on a Lucedale fine sandy loam in Central Alabama (Prattville Research Unit) was conducted in 2007 ...

  13. Cardboard Houses with Wings: The Architecture of Alabama's Rural Studio

    ERIC Educational Resources Information Center

    Botz-Bornstein, Thorsten

    2010-01-01

    The Rural Studio, an outreach program of Auburn University, designs innovative houses for poor people living in Alabama's Hale County by using "junk" such as car windshields, carpet tiles, baled cardboard, and old license plates. The article theorizes this particular architecture in terms of Critical Regionalism, developed by…

  14. Poverty in Alabama. A Barrier to Postsecondary Education.

    ERIC Educational Resources Information Center

    Shannon, Mary Lee Rice

    This study was undertaken with the belief that financial need is not an isolated barrier to postsecondary education and that it is frequently accompanied by distinct motivational, academic, and geographic factors. The distribution of Alabama's poverty on a county level is shown and evaluated. It is noted that all of the countries with a…

  15. Assessing Job Satisfaction among Alabama's Community College Faculty

    ERIC Educational Resources Information Center

    Howton, Russell Warren

    2009-01-01

    The purpose of the study was to examine the relationship between selected demographic and educational variables of faculty members employed in the Alabama Community College System and their impact on job satisfaction. The variables included in the study are the demographic variables of age, gender, ethnicity, salary, and degree status, along with…

  16. The Alabama Space and Rocket Center: The Second Decade.

    ERIC Educational Resources Information Center

    Buckbee, Edward O.

    1983-01-01

    The Alabama Space and Rocket Center in Huntsville, the world's largest rocket and space museum, includes displays illustrating American rocket history, exhibits and demonstrations on rocketry principles and experiences, and simulations of space travel. A new project includes an integrated recreational-educational complex, described in the three…

  17. Ground-water resources of the Alabama River Basin in Alabama; Subarea 8 of the Apalachicola-Chattahoochee-Flint and Alabama-Coosa-Tallapoosa River Basins

    USGS Publications Warehouse

    Kidd, Robert E.; Atkins, J. Brian; Scott, John C.

    1997-01-01

    Drought conditions in the 1980's focused attention on the multiple uses of the surface- and ground-water resources in the Apalachicola-Chattahoochee-Flint (ACF) and Alabama-Coosa-Tallapoosa (ACT) River basins in Georgia, Alabama, and Florida. State and Federal agencies also have proposed projects that would require additional water resources and revise operating practices within the river basins. The existing and proposed water projects create conflicting demands for water by the States and emphasize the problem of water-resource allocation. This study was initiated to describe ground-water availability in the Alabama River basin of Alabama, Subarea 8 of the ACF and ACT River basins, and to estimate the possible effects of increased ground-water use within the basin. Subarea 8 encompasses about 6,750 square miles in the Coastal Plain physiographic province in central and southwestern Alabama. The Alabama River extends from the juncture of the Coosa and Tallapoosa Rivers near the city of Montgomery, to its juncture with the Tombigbee River, near the town of Calvert in Washington County. Subarea 8 includes the Cahaba River basin from the physiographic 'Fall Line' at the city of Centreville in Bibb County, to its mouth in Dallas County; and the Alabama River basin from near Montgomery to the Alabama River cutoff, about 6 miles northeast of its juncture with the Tombigbee River. The study area is underlain by sedimentary deposits of Cretaceous, Tertiary, and Quaternary ages. Major aquifers underlying Subarea 8 are, from shallowest to deepest, the Coastal lowlands aquifer system, the Floridan aquifer system, the Lisbon aquifer, The Nanafalia-Clayton aquifer, the Ripley aquifer, the Eutaw aquifer, and the Tuscaloosa aquifer. The conceptual model described for this study qualitatively subdivides the ground-water flow system into local (shallow), intermediate, and regional (deep) flow regimes. Ground-water discharge to tributaries mainly is from local and intermediate flow

  18. Tech Prep Articulation from Alabama's Public Schools to Alabama's Two-Year Colleges: Perceptions of Administrators, Counselors, and Technical Teachers

    ERIC Educational Resources Information Center

    Cain, H. Jason

    2013-01-01

    Although dual enrollment and other programs that allow high school students to earn college credit are viable and beneficial, articulation is not being extensively utilized. Therefore, the purpose of this study was to examine the articulation policy and its implementation between Alabama's high schools and two-year colleges. It was expected that…

  19. Topobathymetric model of Mobile Bay, Alabama

    USGS Publications Warehouse

    Danielson, Jeffrey J.; Brock, John C.; Howard, Daniel M.; Gesch, Dean B.; Bonisteel-Cormier, Jamie M.; Travers, Laurinda J.

    2013-01-01

    Topobathymetric Digital Elevation Models (DEMs) are a merged rendering of both topography (land elevation) and bathymetry (water depth) that provides a seamless elevation product useful for inundation mapping, as well as for other earth science applications, such as the development of sediment-transport, sea-level rise, and storm-surge models. This 1/9-arc-second (approximately 3 meters) resolution model of Mobile Bay, Alabama was developed using multiple topographic and bathymetric datasets, collected on different dates. The topographic data were obtained primarily from the U.S. Geological Survey (USGS) National Elevation Dataset (NED) (http://ned.usgs.gov/) at 1/9-arc-second resolution; USGS Experimental Advanced Airborne Research Lidar (EAARL) data (2 meters) (http://pubs.usgs.gov/ds/400/); and topographic lidar data (2 meters) and Compact Hydrographic Airborne Rapid Total Survey (CHARTS) lidar data (2 meters) from the U.S. Army Corps of Engineers (USACE) (http://www.csc.noaa.gov/digitalcoast/data/coastallidar/). Bathymetry was derived from digital soundings obtained from the National Oceanic and Atmospheric Administration’s (NOAA) National Geophysical Data Center (NGDC) (http://www.ngdc.noaa.gov/mgg/geodas/geodas.html) and from water-penetrating lidar sources, such as EAARL and CHARTS. Mobile Bay is ecologically important as it is the fourth largest estuary in the United States. The Mobile and Tensaw Rivers drain into the bay at the northern end with the bay emptying into the Gulf of Mexico at the southern end. Dauphin Island (a barrier island) and the Fort Morgan Peninsula form the mouth of Mobile Bay. Mobile Bay is 31 miles (50 kilometers) long by a maximum width of 24 miles (39 kilometers) with a total area of 413 square miles (1,070 square kilometers). The vertical datum of the Mobile Bay topobathymetric model is the North American Vertical Datum of 1988 (NAVD 88). All the topographic datasets were originally referenced to NAVD 88 and no transformations

  20. Alabama Children: A Matter of Commitment and Priority. Special Report to Governor Fob James and the Alabama Legislature. Volume I and Volume II.

    ERIC Educational Resources Information Center

    Ames, Bobbie H.

    This report in two volumes is the product of a year-long needs assessment undertaken by the Governor of Alabama's Commission for the Alabama Year of the Child. Volume I, which contains an overview and recommendations to the governor and the legislature, includes position papers and letters from the commission and interested citizens. These…