Science.gov

Sample records for alabama power company

  1. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    SciTech Connect

    Crew, James F.; Johnson, Herbie N.

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  2. 78 FR 44555 - Alabama Power Company; Notice of Application Accepted for Filing Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Energy Regulatory Commission Alabama Power Company; Notice of Application Accepted for Filing Soliciting..., 2013, and May 9, 2013 d. Applicant: Alabama Power Company e. Name of Project: Martin Dam Hydroelectric... Power Act, 16 U.S.C. 791(a)-825(r) h. Applicant Contact: Amy Stewart, Alabama Power Company, 600...

  3. 78 FR 4844 - Alabama Power Company; Notice Rejecting Request for Rehearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Notice Rejecting Request for Rehearing On March 31, 2010, the Commission issued a new license to Alabama Power Company (Alabama Power) for the continued operation and maintenance of the...

  4. 78 FR 54640 - Alabama Power Company; Notice of Application Tendered for Filing With the Commission, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Production Officer, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35203-2206... operated by Alabama Power consist of: (1) An existing 130-foot-long concrete non-overflow dam; (2)...

  5. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric... of Historic Places at the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed.... Dr. James Kardatzke Bureau of Indian Affairs Eastern Regional Office 545 Marriott Drive, Suite...

  6. 77 FR 26541 - Alabama Power Company; Notice of Application for Amendment of License Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... Request: Due to drought conditions in the Coosa River basin, Alabama Power proposes to release from Jordan.... d. Applicant: Alabama Power Company. e. Name of Project: Jordan Hydroelectric Project. f. Location: On the Coosa River, in Elmore, Chilton and Coosa Counties, Alabama. g. Filed Pursuant to:...

  7. 77 FR 12829 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    .... Applicant Contact: Mr. James F. Crew, Alabama Power Company, 600 North 18th Street, P.O. Box 2641... coil replacement, wicket gate system rehabilitation, greaseless gate stem bushings installation..., the licensee proposes complete turbine refurbishment, stator coil replacement, wicket gate...

  8. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Energy Regulatory Commission Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic Agreement Rule 2010 of the Federal Energy Regulatory Commission's... expense or improve administrative efficiency, the Secretary may establish a restricted service list for...

  9. 76 FR 55378 - Alabama Power Company; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... Energy Regulatory Commission Alabama Power Company; Notice of Proposed Restricted Service List for a... administrative efficiency, the Secretary may establish a restricted service list for a particular phase or issue in a proceeding. The restricted service list should contain the names of persons on the service...

  10. 77 FR 37036 - Alabama Power Company; Notice of Revised Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... Energy Regulatory Commission Alabama Power Company; Notice of Revised Restricted Service List for a... administrative efficiency, the Secretary may establish a restricted service list for a particular phase or issue in a proceeding. The restricted service list should contain the names of persons on the service...

  11. 78 FR 21924 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with...

  12. 76 FR 12722 - Alabama Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Energy Regulatory Commission Alabama Power Company; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's... environmental assessment (EA) has been prepared as a part of Commission staff's review. The EA evaluates...

  13. 75 FR 76000 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests November 30, 2010. a. Type of Application: Non-project use of project lands and waters....

  14. 77 FR 74841 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with...

  15. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service List for a Programmatic Agreement..., the Secretary may establish a restricted service list for a particular phase or issue in a...

  16. 76 FR 19523 - The Alabama Great Southern Railroad Company-Abandonment Exemption-in Saint Bernard Parish, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... Surface Transportation Board The Alabama Great Southern Railroad Company--Abandonment Exemption--in Saint Bernard Parish, LA The Alabama Great Southern Railroad Company (AGS),\\1\\ filed a verified notice of... discontinued in 2006 pursuant to Board authorization in Alabama Great Southern Railroad-- Discontinuance...

  17. 78 FR 14414 - The Alabama Great Southern Railroad Company-Abandonment Exemption-in Gadsden, Etowah County, Ala...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... Gadsden, Etowah County, Ala.; Tennessee, Alabama, and Georgia Railway Company--Abandonment Exemption--in Gadsden, Etowah County, AL The Alabama Great Southern Railroad Company (AGS) and Tennessee, Alabama, and... approximately 4.25 miles of interconnected rail line in Gadsden, Etowah County, Ala. Specifically, AGS...

  18. 77 FR 66607 - Sierra Pacific Power Company, Nevada Power Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sierra Pacific Power Company, Nevada Power Company; Notice of... Pacific Power Company and Nevada Power Company (Applicants) filed a petition for declaratory...

  19. Superfund Record of Decision (EPA region 4): Mowbray Engineering Company, Greenville, Alabama, September 1986. Final report

    SciTech Connect

    Not Available

    1986-09-25

    The Mowbray Engineering Company (MEC) site consists of a 3-acre swamp located in Greenville, Butler County, Alabama. An aquifer underlying the site supplies 11,400 residents with potable water. Waste oils were dumped onto the ground behind the plant. Oil was also allowed to flow into a city storm sewer drain and ultimately into the swamp. Dumping and other discharges continued until the mid 1970s. MEC installed two underground storage tanks to collect oils for resale and prevent spills. PCBs were detected in swamp soils at 500 ppm, leading EPA to remove the top six inches of swamp soil and disposing the wastes in an approved offsite hazardous waste facility. The primary contaminants of concern are PCBs. Selected remedies were proposed and are included.

  20. 76 FR 36527 - Alabama Power Company (Alabama Power); Notice of Application Tendered for Filing With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Martin Dam Project consists of: (1) A concrete gravity dam and an earth dike section, totaling about 2...-long concrete gravity intake structure, (c) a 255-foot-long concrete gravity non-overflow section,...

  1. 78 FR 38026 - Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project Announcing Public Meeting On June...

  2. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy Florida, Inc., Florida Power & Light Company, Tampa Electric Company, and Orlando...

  3. 78 FR 58571 - Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic Electric Company... Commission (NRC) is issuing an exemption in response to a May 16, 2011, request from Maine Yankee Atomic Power Company (Maine Yankee), Connecticut Yankee Atomic Power Company (Connecticut Yankee), and...

  4. The Power Systems Development Facility at Wilsonville, Alabama

    SciTech Connect

    Longanbach, J.R.; Pinkston, T.E.

    1995-03-01

    One of the Morgantown Energy Technology Center`s (METC`s) goals is to: {open_quotes}Commercialize Advanced Power Systems with improved environmental performance, higher efficiency, and lower cost. {close_quotes} Advanced coal-based power generation systems include Integrated Gasification Combined Cycle (IGCC), Pressurized Fluidized- Bed Combustion (PFBC), and Integrated Gasification/Fuel Cell systems. The strategy for achieving this goal includes: (1) Show the improved performance and lower cost of Advanced Power Systems through successful Clean Coal Technology demonstration projects, (2) Build and operate Technology Integration Sites in partnership with U.S. Industry (these sites will resolve key technology issues and effect continuous product improvement, and these partnerships result in leveraging of research and development (R&D) funds), and (3) Set up partnerships with other agencies and organizations such as Electric Power Research Institute (EPRI) to leverage R&D funds and skills. Demonstration of practical high-temperature particulate control devices (PCD`s) is crucial to the evolution of advanced, high- efficiency coal-based power generation systems. There are stringent particulate requirements for the fuel gas for both turbines and fuel cells. In turbines, the particulates cause erosion and chemical attack of the blade surfaces. In fuel cells, the particulates cause blinding of the electrodes. Filtration of the incoming, hot, pressurized gas is required to protect these units. Although filtration can presently be performed by first cooling the gas, the system efficiency is reduced. Development of high temperature, high pressure filtration is necessary to achieve high efficiency and extend the lifetime of downstream components to acceptable levels.

  5. 75 FR 14436 - Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ameren Corporation, Illinois Power Company, Central Illinois Light Company, Central Illinois Public Service Company, Ameren Energy Resources Company, LLC, AmerenEnergy Resources Generating Company; Notice of Filing...

  6. 77 FR 65419 - Virginia Electric and Power Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... and Power Company AGENCY: Nuclear Regulatory Commission. ACTION: Partial Director's Decision; issuance... Power Station, Units 1 and 2 (North Anna 1 and 2), by the Virginia Electric and Power Company (VEPCO or... August 23, 2011, Virginia Electric and Power Company (the licensee) should be required to obtain...

  7. Biomass utilization at Northern States Power Company

    SciTech Connect

    Ellis, R.P.

    1994-12-31

    Northern States Power Company ({open_quotes}NSP{close_quotes}) generates, transmits and distributes electricity and distributes natural gas to customers in Minnesota, Wisconsin, North Dakota, South Dakota and Michigan. An important and growing component of the fuel needed to generate steam for electrical production is biomass. This paper describes NSP`s historical use of biomass, current biomass resources and an overview of how NSP plans to expand its use of biomass in the future.

  8. 78 FR 35017 - Prairie Power, Inc. v. Ameren Services Company, Ameren Illinois Company, Ameren Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Energy Regulatory Commission Prairie Power, Inc. v. Ameren Services Company, Ameren Illinois Company... Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Prairie Power, Inc.... Prairie Power, Inc. certifies that copies of the complaint were served on the contacts for the...

  9. 77 FR 10489 - Xcel Energy Services Inc., Northern States Power Company v. American Transmission Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Energy Regulatory Commission Xcel Energy Services Inc., Northern States Power Company v. American Transmission Company, LLC; Notice of Complaint Take notice that on February 14, 2012, pursuant to section 206...) collectively filed a formal complaint against American Transmission Company, LLC (ATC) regarding...

  10. 75 FR 9591 - Florida Power & Light Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Florida Power & Light Company; Notice of Filing February 24, 2010. Take notice that on February 17, 2010, Florida Power & Light Company (FPL) filed a petition for...

  11. 75 FR 18201 - Wisconsin Electric Power Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wisconsin Electric Power Company; Notice of Filing April 2, 2010. Take notice that on March 26, 2010, Wisconsin Electric Power Company filed counterpart signature pages to...

  12. 77 FR 47623 - Sierra Pacific Power Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Energy Regulatory Commission Sierra Pacific Power Company; Notice of Filing Take notice that on July 13, 2012, Sierra Pacific Power Company d/ b/a NV Energy requested an accounting interpretation concerning.... The Commission encourages electronic submission of protests and interventions in lieu of paper...

  13. Integrated Distribution Management System for Alabama Principal Investigator

    SciTech Connect

    Schatz, Joe

    2013-03-31

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables data access and enterprise application integration.

  14. 170. Credit SHS. Northern California Power Company substation, Bully Hill ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    170. Credit SHS. Northern California Power Company substation, Bully Hill Mine area. Note lack of vegetation, caused by nearby copper smelting works. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  15. 77 FR 9221 - Appalachian Power Company; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... Energy Regulatory Commission Appalachian Power Company; Notice of Application Tendered for Filing With...-012. Date Filed: January 31, 2012. Applicant: Appalachian Power Company. Name of Project: London.... Slone, Manager, Appalachian Power Company, 40 Franklin Road, Roanoke, VA 24011; Telephone (540)...

  16. 77 FR 27760 - Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Energy Regulatory Commission Appalachian Power Company; Notice of Application for Amendment of License..., 2012. d. Applicant: Appalachian Power Company. e. Name of Project: Claytor Hydroelectric Project. f... that resource agency. k. Description of Application: Appalachian Power Company (licensee)...

  17. Electric utility companies and geothermal power

    NASA Technical Reports Server (NTRS)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  18. 77 FR 13156 - Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... environment (February 15, 2012; 77 FR 8903). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company, the licensee, doing business as Progress Energy Carolinas Inc.,...

  19. 75 FR 9958 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... significant effect on the quality of the human environment (75 FR 3942, dated January 25, 2010). This... COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company (the licensee), now doing business as Progress Energy...

  20. 76 FR 23846 - Virginia Electric Power Company, LLC, North Anna Power Station, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Virginia Electric Power Company, LLC, North Anna Power Station, Unit No. 1; Exemption 1.0 Background Virginia Electric Power Company (VEPCO, the licensee) is the holder of Facility Operating License No. NPF-4, which authorizes operation of...

  1. 76 FR 58844 - Virginia Electric and Power Company, Surry Power Station, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Virginia Electric and Power Company, Surry Power Station, Units 1 and 2; Exemption 1.0 Background Virginia Electric and Power Company (VEPCO, the licensee) is the holder of Facility Operating License Nos. DPR-32 and DRP-37, which...

  2. 3. ELEVATIONS, ADDITION TO POWER HOUSE. United Engineering Company Ltd., ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. ELEVATIONS, ADDITION TO POWER HOUSE. United Engineering Company Ltd., Alameda Shipyard. John Hudspeth, architect, foot of Main Street, Alameda, California. Sheet 4. Plan no. 10,548. Scale 1/4 inch to the foot, elevations, and one inch to the foot, sections and details. April 30, 1945, last revised 6/19/45. pencil on vellum - United Engineering Company Shipyard, Boiler House, 2900 Main Street, Alameda, Alameda County, CA

  3. How Trees Help the Power Company!

    ERIC Educational Resources Information Center

    King, Rik

    1992-01-01

    Proposes the utilization of graph theory to solve optimization problems. Defines the notion of spanning trees and presents two algorithms to determine optimization of a spanning tree. Discusses an example to connect towns by power transmission lines at minimum cost. (MDH)

  4. 78 FR 932 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... 20 tie cleats placed for a total of 10 boat slips. The application also requests permission for... application includes an existing dock with 10 boat slips and 20 tie cleats (2802 square feet), a day use pier (294 square feet) with 6 tie cleats, and a boat ramp. The licensee is requesting that the existing...

  5. 75 FR 1050 - Alabama Power Company; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR... River Hydroelectric Project (Coosa River Project), which includes the Weiss, H. Neely Henry, Logan Martin, Lay, and Bouldin developments; the Mitchell Hydroelectric Project (P-82); and the...

  6. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... Revised Restricted Service List for a Programmatic Agreement for Managing Properties Included in or... Preservation Act, as amended, (16 U.S.C. 470f), to prepare a Programmatic Agreement for managing...

  7. 76 FR 70714 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ...: Request for drought-based temporary variance of the Martin Project rule curve and minimum flow releases at... requesting a drought- based temporary variance to the Martin Project rule curve. The rule curve...

  8. 76 FR 9769 - Alabama Power Company; Notice of Application Accepted for Filing, and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... drought conditions in the southeast, and to ensure, to the extent possible, that there will be sufficient... as close to normal operation as possible, while maintaining flexibility to adjust to changing drought... operations and to address drought-related issues. APC would also provide appropriate notice to the public...

  9. 76 FR 1145 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ...: Application Type: Request for drought-based temporary variance of the Martin Project rule curve and minimum... requesting a drought- based temporary variance to the Martin Project rule curve. The rule curve...

  10. 78 FR 30298 - Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric... filing comments, motions to intervene, and protests: June 14, 2013. All documents may be filed... mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests,...

  11. 78 FR 30297 - Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric.... Deadline for filing comments, motions to intervene, and protests: June 14, 2013. All documents may be filed.... n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a...

  12. 75 FR 53295 - Alabama Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... Regulatory Commission's (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of... accommodating a total of 176 watercraft, one concrete boat ramp, 2 wooden boardwalks, 2 asphalt- paved walking trails, and 2 wooden bridges. The applicant would also construct a paved parking lot and concrete...

  13. 78 FR 64486 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of... motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any... capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'' as applicable; (2)...

  14. 78 FR 35015 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    .... n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion... all protests or other comments filed, but only those who file a motion to intervene in accordance with...'', ``PROTEST'', or ``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the name of...

  15. 77 FR 21091 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... long. Approximately 35 cu yd will be excavated for the boat ramp. The applicant proposes to construct... intervene must be received on or before the specified comment date for the particular application. o. Filing...: Non-Project Use of Project Lands and Waters. b. Project No: 2146-136. c. Date Filed: March 1, 2012...

  16. 78 FR 62007 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-11

    ... boundary associated with the Dixie Sailing Club. The marina's facilities to be located inside the project... Sailing Club's clubhouse, parking area, dry boat storage, and other facilities that would be...

  17. 77 FR 8246 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Martin Dam Project consists of: (1) A 2,000-foot-long, 168- foot-high concrete gravity dam and an earth... gates, each measuring 30 feet wide by 16 feet high; (b) a 250- foot-long concrete gravity intake structure, (c) a 255-foot-long concrete gravity non-overflow section, and (d) an approximately 1,000-...

  18. 75 FR 5073 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ...) 257-1403. i. FERC Contact: Any questions regarding this notice should be directed to Isis Johnson, Telephone (202) 502-6346, and e-mail: isis.johnson@ferc.gov . j. Deadline for filing comments, motions...

  19. Spent fuel management at the Northern States Power Company

    SciTech Connect

    Closs, J.; Kress, L.

    1996-05-01

    The disposal of nuclear waste has become a critical factor in the continued operation of several commercial nuclear power plants in the US. As the debate continues, spent fuel pools continue to fill and plants edge closer to premature shutdown. This article describes the extensive spent fuel management program (ISFSI) of the Northern States Power Company (NSP). NSP owns and operates two nuclear power plants (Monticello and Prairie Island). Despite political opposition and legal restraint the program has successfully resolved storage limitations at its nuclear plants and has provided for the continuation of power at NSP. Projected plans for the future are also discussed.

  20. 77 FR 26321 - Virginia Electric and Power Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... COMMISSION [Docket Nos. 50-338 and 50-339; NRC-2012-0051; License Nos. NPF-4 and NPF-7] Virginia Electric and... Electric and Power Company (VEPCO or the licensee). The petition requested that the NRC: (1) Take escalated... lack of free field instrumentation, issues associated with conversion of analog data to digital...

  1. 2. Credit PEM. View of Martinsburg Power Company steam generating ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Credit PEM. View of Martinsburg Power Company steam generating plant. From right to left: original 1889 generating building, transformer room, new generating room and, adjacent to draft stack is boiler room addition. Photo c. 1911. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  2. Alabama Water Use, 2005

    USGS Publications Warehouse

    Hutson, Susan S.; Littlepage, Thomas M.; Harper, Michael J.; Tinney, James O.

    2009-01-01

    Water is one of Alabama's most precious natural resources. It is a vital component of human existence and essential to the overall quality of life. Wise stewardship of this valuable resource depends on a continuing assessment of water availability and water use. Population growth in many parts of the State has resulted in increased competition for available water resources. This competition includes offstream uses, such as residential, agricultural, and industrial, and instream uses for maintenance of species habitat and diversity, navigation, power generation, recreation, and water quality. Accurate water-use information is required for sound management decisions within this competitive framework and is necessary for a more comprehensive understanding of the link between water use, water supply, and overall water availability. A study of water use during 2005 was conducted by the U.S. Geological Survey (USGS), in cooperation with the Alabama Department of Economic and Community Affairs, Office of Water Resources, Water Management Branch (ADECA-OWR), to provide water-use data for local and State water managers. The results of the study about the amount of water used, how it was used, and where it was used in Alabama have been published in 'Estimated use of water in Alabama in 2005' by Hutson and others, 2009, and is accessible on the Web at http://pubs.usgs.gov/sir/2009/5163 and available upon request as a CD-ROM through USGS and ADECA-OWR.

  3. Tampa Electric Company`s Polk Power Station Integrated Gasification Combined Cycle Project

    SciTech Connect

    Jenkins, S.D.; Shafer, J.R.

    1994-12-31

    Tampa Electric Company (TEC) is in the construction phase for the new Polk Power Station, Unit {number_sign}1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. The unit will utilize oxygen-blown entrained-flow coal gasification, along with combined cycle technology, to provide nominal net 26OMW of generation. As part of the environmental features of this process, the sulfur species in the coal will be recovered as a commercial grade sulfuric acid by-product. The sulfur will be removed from the synthesis gas utilizing a cold gas clean-up system (CGCU).

  4. 78 FR 46616 - Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Surry Power Station...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... COMMISSION Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Surry Power Station... the Emergency Plan, ``Conditions of licenses,'' for North Anna Power Station, Units 1 and 2 (NAPS), for Renewed Facility Operating License Nos. NPF-4 and NPF-7, and Surry Power Station, Units 1 and...

  5. 77 FR 21093 - Seminole Electric Cooperative, Inc. v. Florida Power & Light Company; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Seminole Electric Cooperative, Inc. v. Florida Power & Light Company; Notice... Cooperative, Inc. (Complainant) filed a complaint alleging that Florida Power & Light Company...

  6. 75 FR 32516 - Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Surry Power Station, Unit Nos.1 and 2... Station, Unit Nos. 1 and 2 (NAPS) and Surry Power Station, Unit Nos. 1 and 2 (SPS) located in Lake Anna... National Aeronautics and Space Administration and Interek, that the equipment will continue to provide...

  7. 76 FR 7840 - American Hydro Power Company; Notice of Termination of Exemption by Implied Surrender and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission American Hydro Power Company; Notice of Termination of Exemption by Implied...: American Hydro Power Company. e. Name and Location of Project: The Gilpin Falls Project is located on... Information: Mr. Richard J. Halloran, American Hydro Power Company, 771 E. Lancaster Ave., Suite...

  8. 77 FR 38619 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Idaho Power Company; Notice of Application for Amendment of License and...: Idaho Power Company. e. Name of Project: Bliss Hydroelectric Project. f. Location: The project is... agency. k. Description of the Application: Idaho Power Company, licensee of the Bliss...

  9. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Idaho Power Company; Notice of Application for Amendment of License and...: Idaho Power Company. e. Name of Project: Lower Salmon Falls Hydroelectric Project. f. Location: The... agency. k. Description of the Application: Idaho Power Company, licensee of the Lower Salmon...

  10. 77 FR 38620 - Idaho Power Company; Notice of Application for Amendment of License And Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Idaho Power Company; Notice of Application for Amendment of License And...: Idaho Power Company. e. Name of Project: Upper Salmon Falls Hydroelectric Project. f. Location: The...: Idaho Power Company, licensee of the Upper Salmon Falls Hydroelectric Project, has filed a...

  11. 77 FR 35956 - Appalachian Power Company; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Energy Regulatory Commission Appalachian Power Company; Notice of Application Accepted for Filing...: January 31, 2012. d. Applicant: Appalachian Power Company. e. Name of Project: London-Marmet and Winfield..., Appalachian Power Company, 40 Franklin Road, Roanoke, VA 24011; Telephone (540) 985-2861. i. FERC...

  12. 76 FR 48840 - Appalachian Power Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Energy Regulatory Commission Appalachian Power Company; Notice of Authorization for Continued Project Operation On June 29 2009, The Appalachian Power Company, licensee for the Claytor Hydroelectric Project... license for Project No. 739 is issued to the Appalachian Power Company for a period effective July 1,...

  13. Particulate Control Device (PCD) Testing at the Power Systems Development Facility, Wilsonville, Alabama

    SciTech Connect

    Longanbach, J.R.

    1995-12-01

    One of the U.S. Department of Energy`s (DOE`s) objectives overseen by the Morgantown Energy Technology Center (METC) is to test systems and components for advanced coal-based power generation systems, including integrated gasification combined cycle (IGCC), pressurized fluidized-bed combustion (PFBC), and integrated gasification/fuel cell (IGFC) systems. Stringent particulate requirements for fuel gas for both combustion turbines and fuel cells that are integral to these systems. Particulates erode and chemically attack the blade surfaces in turbines, and cause blinding of the electrodes in fuel cells. Filtration of the hot, high-pressure, gasified coal is required to protect these units. Filtration can be accomplished by first cooling the gas, but the system efficiency is reduced. High-temperature, high-pressure, particulate control devices (PCDs) need to be developed to achieve high efficiency and to extend the lifetime of downstream components to acceptable levels. Demonstration of practical high-temperature PCDs is crucial to the evolution of advanced, high-efficiency, coal-based power generation systems. The intent at the Power Systems Development Facility (PSDF) is to establish a flexible test facility that can be used to (1) develop advanced power system components, such as high-temperature, high-pressure PCDs; (2) evaluate advanced power system configurations and (3) assess the integration and control issues of these advanced power systems.

  14. 75 FR 77919 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an exemption,...

  15. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... FR 13926), establish and update generically applicable security requirements similar to those... FR 77919 dated December 14, 2010). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption...

  16. Georgia Power Company solar as-built drawings (Engineering Materials)

    SciTech Connect

    Not Available

    1980-04-30

    This package consists of a set of sepia reproducibles of the Final As-Built document of the Georgia Power Company solar heating and cooling system. The system utilizes 1482 DEL concentrating parabolic trough collectors (23,712 ft/sup 2/). The solar array is designed as a combination of series and parallel circuits circulating water as the heat transfer fluid. The system will displace 18.6% of the heating and cooling energy for the building. Reference DOE/AL/12548--T1.

  17. 78 FR 32385 - Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Energy Regulatory Commission Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC; Constellation NewEnergy, Inc.; Constellation Power Source Generation, Inc.; Criterion Power..., CER Generation II, LLC, Constellation Mystic Power, LLC, Constellation NewEnergy, Inc.,...

  18. Southern Company`s standby generator program

    SciTech Connect

    Swartz, S.

    1995-12-01

    Alabama Power Company (APCO) continues to look for ways to improve customer satisfaction and enact demand-side management programs. The decision was made to evaluate the availability of customer-owned generators in order to meet these objectives. The idea was to utilize customer-owed standby generators (SG) as we would a peaking plant and to pay the customer credits based on the cost of the construction of peaking capacity plants. It was felt that if APCO could utilize this capacity to offset the construction of peaking capacity, then these costs would be passed on to our customers.

  19. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Idaho Power Company; Notice of Application for Amendment of License and...: Idaho Power Company. e. Name of Project: C.J. Strike Hydroelectric Project. f. Location: The project is... Company, licensee of the C.J. Strike Hydroelectric Project, has filed a Land Management Plan (LMP)...

  20. 77 FR 38621 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Idaho Power Company; Notice of Application for Amendment of License and...: Idaho Power Company e. Name of Project: Shoshone Falls Hydroelectric Project. f. Location: The project... Company, licensee of the Shoshone Falls Hydroelectric Project, has filed a Land Management Plan...

  1. Distribution automation pilot project at Georgia Power Company. Final report

    SciTech Connect

    Hall, J.M.

    1997-12-01

    This report includes a Benefit-Cost Study for Distribution Automation (DA) at Georgia Power Company, an Evaluation of two communication systems for Distribution Automation, and Development and Evaluation of a standards-based interface between an AM/FM system and SCADA. The Benefit-Cost Study addresses the functional requirements and performance of the major Distribution Automation functions under GPC`s conditions. Five implementation scenarios for Distribution Automation are analyzed. The performance of the DA functions is simulated for four prototype GPC substations in the Carrollton and Tucker areas. The results of the simulation are extrapolated for the entire GPC distribution system. A number of reliability related functions along with real-time modeling and volt/var control functions are recommended for implementation at GPC. GPC has installed two pilot communication systems for Distribution Automation. Both pilot systems use proprietary radio technologies for communications with pole-top power system devices and customer meters. One of these systems, in the Carrollton area, uses a Metricom{trademark} UtiliNet{trademark} radio system, and the other, in the Tucker area, uses a CellNet{trademark} Data Systems, Inc. CellNet radio system. The performance of these two systems is described and evaluated in the project. The advantages and disadvantages of the communication systems for the recommended distribution automation system at GPC are analyzed. A transfer format from a mapping and facilities database to a SCADA database for the Georgia Power Company was developed and tested for the project. The mapping and facilities database is implemented as an Oracle database in the ARC/Info AM/FM/GIS application by ESRI, and the SCADA database is implemented on the OASyS 5.0 SCADA platform provided by Valmet Automation. The National Transfer Format (NTF) is the vehicle for the transfer of data from the GIS to the SCADA system.

  2. Tampa Electric Company Polk Power Station IGCC project: Project status

    SciTech Connect

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  3. Duke Power Company's development of a biofouling monitoring program

    SciTech Connect

    Derwort, J.E.; Gnilka, A. )

    1991-11-01

    Biofouling programs at Duke Power Company (DPC) can be traced to the invasion of the Catawba River system by Corbicula in 1968. Raw water systems at Plant Allen, a coal-fired station on Lake Wylie, became heavily infested by clams during the 1970s. Development of programs was accelerated as a result of the shutdown of Catawba nuclear station (CNS) on lake Wylie in 1986 due to clam infestations in safety-related systems, increased biofouling problems at McGuire nuclear station (MNS) on lake Norman, and by the issuance of the US Nuclear Regulatory Commission's (NRC's) Generic Letter (GL) 89-13 (issued in 1989). Historical data were reviewed to identify pertinent questions, and a refined, multifaceted Corbicula monitoring plan was developed. This plan was implemented at CNS and MNS in 1989.

  4. 77 FR 40914 - In the Matter of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR... of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory Order Modifying License (Effective Immediately) I Indiana Michigan Power Company (Licensee) is the holder of...

  5. 77 FR 36298 - In the Matter of Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Station...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August... COMMISSION In the Matter of Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Station... Yankee Atomic Power Company (Maine Yankee or the Licensee), to address statutory requirements and...

  6. 77 FR 63342 - Virginia Electric and Power Company, Surry Power Station Units 1 and 2 and North Anna Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ..., Project Manager, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S..., Project Manager, Plant Licensing Branch II-1, Division of Operating Reactor Licensing, Office of Nuclear... COMMISSION Virginia Electric and Power Company, Surry Power Station Units 1 and 2 and North Anna...

  7. 77 FR 25163 - Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... Energy Regulatory Commission Stoughton Water Power Company; Notice of Preliminary Permit Application..., 2011, the Stoughton Water Power Company filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Stoughton Dam Water...

  8. 77 FR 58823 - Interstate Power and Light Company v. ITC Midwest, LLC, Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Interstate Power and Light Company v. ITC Midwest, LLC, Notice of Complaint... Power Act, 16 U.S.C. 824(e), Interstate Power and Light Company (Complainant) filed a formal...

  9. 75 FR 28597 - Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Energy Regulatory Commission Georgia Power Company; Notice of Application for Amendment of License and... 23, 2010, supplemented May 7, 2010. d. Applicant: Georgia Power Company. ] e. Name of Project: North... project's Tallulah Falls development in Rabun County, Georgia. g. Pursuant to: Federal Power Act, 16...

  10. 78 FR 8502 - Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Energy Regulatory Commission Appalachian Power Company; Notice of Application for Amendment of License... 27, 2012. d. Applicant: Appalachian Power Company. e. Name of Project: Claytor Hydroelectric Project..., Appalachian Power filed a request to amend the approved shoreline management plan (SMP) for the...

  11. 76 FR 36914 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC, v. New York...

  12. 76 FR 36910 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC. v. New York...

  13. 76 FR 34692 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC; v. New York...

  14. 75 FR 32449 - Appalachian Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... Mountain Lake Hydroelectric Project. f. Location: The project is located in Pittsylvania, Bedford, Franklin.... Applicant Contact: Ms. Elizabeth Parcell, Appalachian Power Company, 996 Old Franklin Turnpike, Rocky...

  15. 75 FR 29531 - Resale Power Group of Iowa, WPPI Energy v. ITC Midwest LLC, Interstate Power and Light Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ..., Interstate Power and Light Company; Notice of Complaint May 19, 2010. Take notice that on May 18, 2010... Interstate Power and Light Company (Respondents), alleging that the Respondents failed to file changes in... not serve to make protestants parties to the proceeding. Any person wishing to become a party...

  16. 75 FR 12533 - The Power Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission The Power Company, Inc.; Notice of Preliminary Permit Application Accepted... Power Act, proposing to study the feasibility of the Damariscotta River Hydrokinetic Tidal...

  17. 76 FR 52356 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment and... to Indiana Michigan Power Company (the licensee), for operation of Donald C. Cook Nuclear Plant, Unit 1 (DCCNP-1), located in Berrien County, Michigan, in accordance with Title 10 of the Code of...

  18. 75 FR 73070 - Lockhart Power Company, South Carolina; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Energy Regulatory Commission Lockhart Power Company, South Carolina; Notice of Availability of... reviewed Lockhart Power Company's application for license for the Pacolet Hydroelectric Project (FERC... Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...

  19. 75 FR 34776 - Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... COMMISSION Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4; Environmental..., for Facility Operating License Nos. DPR-31 and DPR-41, issued to Florida Power & Light Company (the... quantity of non- radiological effluents. No changes to the National Pollution Discharge Elimination...

  20. 76 FR 68512 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... environment (October 26, 2011; 76 FR 6633). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Renewed Facility Operating...

  1. 77 FR 26793 - Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... significant effect on the quality of the human environment (76 FR 53497; August 26, 2011). This exemption is... COMMISSION Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  2. 75 FR 13142 - Florida Power and Light Company; Turkey Point, Units 3 and 4; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... not have a significant effect on the quality of the human environment (75 FR 4426) This exemption is... COMMISSION Florida Power and Light Company; Turkey Point, Units 3 and 4; Exemption 1.0 Background Florida Power and Light Company (FPL, the licensee), is the holder of Facility Operating License Nos. DPR-31...

  3. 75 FR 62154 - Carolina Power & Light Company; Notice of Withdrawal of Application for Amendment to Renewed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... Register on February 24, 2009 (74 FR 8283). However, by letter dated September 28, 2010, the licensee... COMMISSION Carolina Power & Light Company; Notice of Withdrawal of Application for Amendment to Renewed... request of the Carolina Power & Light Company (the licensee) to withdraw its application dated...

  4. 76 FR 77563 - Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... exemption will not have a significant effect on the quality of the human environment (76 FR 53497; dated... COMMISSION Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  5. 75 FR 16871 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... significant effect on the quality of the human environment (75 FR 8753, February 25, 2010). This exemption is... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Facility Operating...

  6. 76 FR 802 - Florida Power and Light Company, Turkey Point, Units 3 and 4; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... in the Federal Register dated July 12, 2010 (75 FR 39707). Lessons Learned The effects of Hurricane... COMMISSION Florida Power and Light Company, Turkey Point, Units 3 and 4; Exemption 1.0 Background Florida Power and Light Company (FPL, the licensee) is the holder of Facility Operating License Nos. DPR-31...

  7. 75 FR 57746 - Lockhart Power Company; Notice of Application Tendered for Filing With the Commission, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... penstock; (4) a powerhouse containing a single 1.45-megawatt turbine-generator unit; (5) a 1400-foot-long... Energy Regulatory Commission Lockhart Power Company; Notice of Application Tendered for Filing With the...: Lockhart Power Company. e. Name of Project: Riverdale Hydroelectric Project. f. Location: On the...

  8. 75 FR 143 - Lockhart Power Company; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-04

    ... applicant proposes to install a single submersible turbine/generator unit in the hydro canal bank and... COMMISSION Lockhart Power Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene... Power Company. e. Name of Project: Lockhart Project. f. Location: The project is located on the...

  9. 77 FR 40608 - Wisconsin Electric Power Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Energy Regulatory Commission Wisconsin Electric Power Company; Notice of Petition for Declaratory Order...) Rules of Practice and Procedure, 18 CFR 381.302 and 385.207, Wisconsin Electric Power Company (Wisconsin Electric) submitted a petition requesting the Commission to issue a declaratory order approving:...

  10. 77 FR 8903 - Environmental Assessment and Finding of No Significant Impact; Carolina Power and Light Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... COMMISSION Environmental Assessment and Finding of No Significant Impact; Carolina Power and Light Company... CFR) 50.46, ``Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power... Light Company (the licensee), doing business as Progress Energy Carolinas Inc., for operation of...

  11. 76 FR 18750 - Ocean Renewable Power Company, LLC; Notice of Change in Docket Number

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Energy Regulatory Commission Ocean Renewable Power Company, LLC; Notice of Change in Docket Number On July 24, 2009, Ocean Renewable Power Company, LLC (ORPC) filed a draft hydrokinetic pilot license... of this change in docket number, all current filings and issuances associated with the Eastport...

  12. 77 FR 6556 - Birch Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Birch Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 1, 2011, Birch Power Company filed an...

  13. 76 FR 41530 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval of... Atomic Power Company (CYAPCO), as owner and licensed operator of the Haddam Neck Plant. According to...

  14. 75 FR 33653 - Connecticut Yankee Atomic Power Company; Notice of Consideration of Issuance of Amendment to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ... rule (72 FR 49139, August 28, 2007). The E-Filing process requires participants to submit and serve all... COMMISSION Connecticut Yankee Atomic Power Company; Notice of Consideration of Issuance of Amendment to... amendment to Facility Operating License No. DPR-61 issued to Connecticut Yankee Atomic Power Company...

  15. 75 FR 45107 - Idaho Power Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... July 23, 2010. On June 26, 2008, Idaho Power Company, licensee for the Swan Falls Hydroelectric Project... regulations thereunder. The Swan Falls Hydroelectric Project is on the Snake River in Ada and Owyhee counties..., notice is hereby given that Idaho Power Company is authorized to continue operation of the Swan...

  16. 77 FR 5791 - Ocean Renewable Power Company Maine, LLC; Notice of Staff Participation in Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ocean Renewable Power Company Maine, LLC; Notice of Staff Participation in... representatives from Ocean Renewable Power Company Maine, LLC at the Federal Energy Regulatory...

  17. 77 FR 64330 - Upper Peninsula Power Company; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Upper Peninsula Power Company; Notice of Application Accepted for Filing.... d. Applicant: Upper Peninsula Power Company. e. Name of Project: Bond Falls Hydroelectric Project....

  18. 77 FR 77073 - York Haven Power Company, LLC; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Energy Regulatory Commission York Haven Power Company, LLC; Notice of Meeting On Wednesday, January 9, 2013, Commission staff will meet with York Haven Power Company, LLC (applicant) in Washington, DC. The... York Haven Hydroelectric Project No. 1888. The meeting will begin at 10 a.m. at the Federal...

  19. 75 FR 62531 - Georgia Power Company; Notice of Meeting and Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Notice of Meeting and Environmental Site Review October 4, 2010. On October 14, 2010, Commission staff, together with representatives of Georgia Power Company (the applicant), will hold a...

  20. 75 FR 53984 - Virginia Electric and Power Company North Anna Power Station, Unit Nos. 1 and 2 Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-338 and 50-339, Docket Nos. 50-280 and 50-281, NRC- 2010-0283] Virginia Electric.... DPR-32 and DPR-37, issued to Virginia Electric and Power Company (the licensee), for operation of...

  1. 75 FR 76495 - Virginia Electric and Power Company North Anna Power Station, Unit Nos. 1 and 2 Surry Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... COMMISSION [Docket Nos. 50-338 and 50-339; Docket Nos. 50-280 and 50-281; NRC- 2010-0376] Virginia Electric... License Nos. DPR-32 and DPR-37, issued to Virginia Electric and Power Company (the licensee), for... adverse effect on the probability of an accident occurring. The proposed action would not result in...

  2. 75 FR 35786 - Resale Power Group of Iowa, WPPI Energy v. ITC Midwest LLC, Interstate Power and Light Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... and Light Company; Notice of Filing June 16, 2010. Take notice that, on June 15, 2010, Resale Power... considered by the Commission in determining the appropriate action to be taken, but will not serve to...

  3. 75 FR 9618 - Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... March 29, 2009 (74 FR 13967). There will be no change to radioactive effluents that effect radiation... impact (Part 73, Power Reactor Security Requirements (74 FR 13926), March 27, 2009). If this exemption is... COMMISSION Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2...

  4. 75 FR 38147 - FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC, the licensee) is the holder of Facility Operating...

  5. 77 FR 36302 - Yankee Atomic Electric Company, Yankee Nuclear Power Station, Confirmatory Order Modifying...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR... COMMISSION Yankee Atomic Electric Company, Yankee Nuclear Power Station, Confirmatory Order Modifying License... (NRC or the Commission) issued a Confirmatory Order to Yankee Atomic Electric Company (Yankee Atomic...

  6. 76 FR 41532 - Yankee Atomic Electric Company, Yankee Nuclear Power Station (Yankee-Rowe); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... COMMISSION Yankee Atomic Electric Company, Yankee Nuclear Power Station (Yankee-Rowe); Notice of...-Rowe), currently held by Yankee Atomic Electric Company (YAEC), as owner and licensed operator...

  7. 76 FR 42122 - Ocean Renewable Power Company, LLC; Notice Concluding Pre-Filing Process and Approving Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... Energy Regulatory Commission Ocean Renewable Power Company, LLC; Notice Concluding Pre-Filing Process and... By: Ocean Renewable Power Company, LLC. e. Name of Project: Cobscook Bay Tidal Energy Project. f... R. Sauer, Ocean Renewable Power Company, LLC, 120 Exchange Street, Suite 508, Portland, Maine...

  8. 77 FR 33004 - Exelon Generation Company, LLC; Clinton Power Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-04

    ... Company, LLC (the licensee, EGC) for operation of the Clinton Power Station, Unit 1 (CPS), located in De... EGC, from CPS to Creek Township to expand the Lisenby Cemetery. Before acceptance of the partial...

  9. 75 FR 7471 - Chandra Coffee and Rabun Boatworks, Complainants v. Georgia Power Company, Respondent; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Chandra Coffee and Rabun Boatworks, Complainants v. Georgia Power Company... January 8, 2010, Chandra Coffee and Rabun Boatworks (Complainants) filed with the Federal...

  10. 75 FR 20991 - Upper Peninsula Power Company; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Upper Peninsula Power Company; Notice of Availability of Environmental... Energy Regulatory Commission's regulations, 18 CFR part 380, Commission staff have prepared...

  11. Evaluation of Year 2 of the Alabama Reading Initiative.

    ERIC Educational Resources Information Center

    O'Neal, Marcia R.; Snyder, Scott W.; Spor, Mary W.

    This report summarizes research supports addressing three areas as targets for educational improvement in Alabama: beginning reading, expansion of reading power, and intensive intervention for those who are reading below grade level. The paper also describes Alabama's statewide initiative to implement best practices in these areas and summarizes…

  12. 75 FR 2564 - Virginia Electric and Power Company D/B/A Dominion Virginia Power and Old Dominion Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... significant effect on the quality of the human environment (74 FR 65161). This exemption is effective upon... COMMISSION Virginia Electric and Power Company D/B/A Dominion Virginia Power and Old Dominion Electric Cooperative; Combined License Application for North Anna Unit 3; Exemption 1.0 Background Virginia...

  13. 76 FR 77021 - In the Matter of Carolina Power & Light Company, North Carolina Eastern Municipal Power Agency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... Hearing,'' was published in the Federal Register on August 30, 2011 (76 FR 53967). No comments or hearing... Carolina Power & Light Company (CP&L, the licensee) and North Carolina Eastern Municipal Power Agency are... Carolina. The facility operating license authorizes CP&L to possess, use, and operate the Harris...

  14. 75 FR 16521 - Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... environment (75 FR 9618) published March 3, 2010, as corrected in the Federal Register on March 19, 2010 (75 FR 13318) by letter dated March 12, 2010 (Agencywide Documents Access and Management System Accession... COMMISSION Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2; Exemption...

  15. 75 FR 29336 - ILP Effectiveness Evaluation 2010; Georgia Power Company; et al.; Notice of Interviews...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... Energy Regulatory Commission ILP Effectiveness Evaluation 2010; Georgia Power Company; et al.; Notice of... Licensing Process May 18, 2010. ] ILP Effectiveness Evaluation 2010.. Docket No. AD10-7-000. Georgia Power... effectiveness of the Integrated Licensing Process (ILP), Federal Energy Regulatory Commission (FERC)...

  16. 77 FR 21094 - Alaska Power & Telephone Company; Notice of Declaration of Intention and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... water or water power from a government dam; or (4) if applicable, has involved or would involve any... Energy Regulatory Commission Alaska Power & Telephone Company; Notice of Declaration of Intention and... of Intention. b. Docket No: DI12-4-000. c. Date Filed: March 29, 2012. d. Applicant: Alaska...

  17. 75 FR 5074 - Oleander Power Project, LP; Southern Company-Florida LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Oleander Power Project, LP; Southern Company-Florida LLC; Notice of Filing January 22, 2010. Take notice that on January 14, 2010, Oleander Power Project, LP and Southern...

  18. 77 FR 18874 - Virginia Electric and Power Company; Receipt of Request for Action

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... COMMISSION [Docket Nos. 50-338 and 50-339; NRC-2012-0075; License Nos. NPF-4 and NPF-7] Virginia Electric and... Virginia Electric and Power Company's (the licensee's) North Anna Power Station, Units 1 and 2 (North Anna... blackout. (14) The current emergency evacuation plans for North Anna 1 and 2, need to be revised to...

  19. 77 FR 14775 - Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 7, 2011, the Stoughton Water Power...

  20. 78 FR 79688 - Newmont Nevada Energy Investment LLC v. Sierra Pacific Power Company; Notice of Complaints

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Newmont Nevada Energy Investment LLC v. Sierra Pacific Power Company; Notice of Complaints Take notice that on December 23, 2013, pursuant to sections 206 and 306 of the Federal Power Act (FPA), 16 U.S.C. 824e, and...

  1. Site Characterization for CO{sub 2} Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama

    SciTech Connect

    Clark, Peter; Pashin, Jack; Carlson, Eric; Goodliffe, Andrew; McIntyre-Redden, Marcella; Mann, Steven; Thompson, Mason

    2012-08-31

    Coal-fired power plants produce large quantities of carbon dioxide. In order to mitigate the greenhouse gas emissions from these power plants, it is necessary to separate and store the carbon dioxide. Saline formations provide a potential sink for carbon dioxide and delineating the capacity of the various known saline formations is a key part of building a storage inventory. As part of this effort, a project was undertaken to access the storage capacity of saline reservoirs in the Black Warrior Basin of Alabama. This basin has been a productive oil and gas reservoir that is well characterized to the west of the two major coal-fired power plants that are north of Birmingham. The saline zones were thought to extend as far east as the Sequatchie Anticline which is just east of the power plants. There is no oil or gas production in the area surrounding the power plants so little is known about the formations in that area. A geologic characterization well was drilled on the Gorgas Power Plant site, which is the farthest west of two power plants in the area. The well was planned to be drilled to approximately 8,000 feet, but drilling was halted at approximately 5,000 feet when a prolific freshwater zone was penetrated. During drilling, a complete set of cores through all of the potential injection zones and the seals above these zones were acquired. A complete set of openhole logs were run along with a vertical seismic profile (VSP). Before drilling started two approximately perpendicular seismic lines were run and later correlated with the VSP. While the zones that were expected were found at approximately the predicted depths, the zones that are typically saline through the reservoir were found to be saturated with a light crude oil. Unfortunately, both the porosity and permeability of these zones were small enough that no meaningful hydrocarbon production would be expected even with carbon dioxide flooding. iv While this part of the basin was found to be unsuitable

  2. Car companies look to generate power from waste heat

    NASA Astrophysics Data System (ADS)

    Schirber, Michael

    2008-04-01

    You might think that the steam engine is an outdated technology that had its heyday centuries ago, but in fact steam is once again a hot topic with vehicle manufacturers. Indeed, the next generation of hybrid cars and trucks may incorporate some form of steam power. Honda, for example, has just released details of a new prototype hybrid car that recharges its battery using a steam engine that exploits waste heat from the exhaust pipe.

  3. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... COMMISSION Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental..., ``Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,'' and 10 CFR... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee),...

  4. 76 FR 77024 - In the Matter of Carolina Power & Light Company North Carolina Eastern, Municipal Power Agency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... Register on August 30, 2011 (76 FR 53970). No comments or hearing requests were received. Pursuant to 10... Company (CP&L, the licensee) and North Carolina Eastern Municipal Power Agency are the owners of Brunswick... and an ISFSI located in Brunswick County, North Carolina. The facility operating licenses authorize...

  5. 76 FR 6638 - Virginia Electric and Power Company D/B/A/ Dominion Virginia Power and Old Dominion Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ...) on March 26, 2010 (75 FR 14594). The environmental impacts analyzed within NUREG-1917 are based, in... published in the Federal Register by the EPA on December 22, 2006 (71 FR 77014). The purpose of this notice... Environmental Impact Statement and Conduct Scoping Process On June 28, 2010, Virginia Electric Power Company...

  6. 78 FR 71595 - Appalachian Power Company; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ...: October 10, 2013. d. Applicant: Appalachian Power Company (licensee). e. Name of Project: Smith Mountain Pumped Storage Project. f. Location: The Smith Mountain Project is located on the Roanoke River in Bedford, Campbell, Franklin, and Pittsylvania Counties, Virginia. The project does not occupy any...

  7. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967). There will be no... Requirements, 74 FR 13926, 13967 (March 27, 2009)). The licensee currently maintains a security system... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2;...

  8. 77 FR 55878 - Florida Power & Light Company; Receipt of Request for Action

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION [Docket Nos.: 50-250, 50-251, 50-335, and 50-389; NRC-2012-0210; License Nos.: DPR-31, DPR-41, DPR-67, and NPF-16] Florida Power & Light Company; Receipt of Request for Action Notice is hereby...

  9. 78 FR 76903 - Lockhart Power Company, Inc.; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ... From the Federal Register Online via the Government Publishing Office ] Vol. 78 Thursday, No. 244 December 19, 2013 Part II Department of Energy Federal Energy Regulatory Commission Lockhart Power Company, Inc.; Notice of Availability of Draft Environmental Assessment; Notice #0;#0;Federal Register / Vol. 78 , No. 244 / Thursday, December 19, 2013...

  10. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 11, 2013, Alaska Electric...

  11. 77 FR 51071 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment and Finding of No Significant Impact The Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an exemption and an...

  12. 77 FR 12887 - Virgina Electric and Power Company; Receipt of Request for Action

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... COMMISSION [Docket Nos. 50-338 and 50-339; NRC-2012-0051; License Nos. NPF-4 and NPF-7] Virgina Electric and... Commission (NRC or the Commission) take action with regard to Virginia Electric and Power Company's (the... North Anna 1 and 2, including lack of free field instrumentation, issues associated with conversion...

  13. 77 FR 108 - Lockhart Power Company, Inc.; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... steel penstock; (4) a powerhouse containing a single 1.24-megawatt turbine-generator unit; (5) a 510... repair or upgrade the turbine unit and return the project operation. The proposed project would generate... Energy Regulatory Commission Lockhart Power Company, Inc.; Notice Soliciting Scoping Comments Take...

  14. 75 FR 22772 - Cargill Power Markets, LLC, Complainant v. Public Service Company of New Mexico, Respondent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Cargill Power Markets, LLC, Complainant v. Public Service Company of New Mexico, Respondent; Notice of Complaint April 21, 2010. Take notice that on April 20, 2010, pursuant to section 206 of the Federal...

  15. 77 FR 11532 - Algonquin Power Company; Abenaki Timber Corporation; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Algonquin Power Company; Abenaki Timber Corporation; Notice of Transfer of... Stafford County, New Hampshire. The transfer of an exemption does not require Commission approval. \\1\\...

  16. 77 FR 28871 - Algonquin Power Company; Abenaki Timber Corporation; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Algonquin Power Company; Abenaki Timber Corporation; Notice of Transfer of... transfer of an exemption does not require Commission approval. \\1\\ 18 CFR 4.106(i)(2011). \\2\\ 21 FERC ]...

  17. 78 FR 50410 - Birch Power Company; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... Project] Birch Power Company; Notice of Proposed Restricted Service List for a Programmatic Agreement Rule..., the Secretary may establish a restricted service list for a particular phase or issue in a proceeding. The restricted service list should contain the names of persons on the service list who, in...

  18. METRO-APEX Volume 11.1: Industrialists' Manual No. 1, Shear Power Company. Revised.

    ERIC Educational Resources Information Center

    University of Southern California, Los Angeles. COMEX Research Project.

    The Industrialist's Manual No. 1 (Shear Power Company) is one of a set of twenty-one manuals used in METRO-APEX 1974, a computerized college and professional level, computer-supported, role-play, simulation exercise of a community with "normal" problems. Stress is placed on environmental quality considerations. APEX 1974 is an expansion of…

  19. 75 FR 76498 - Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental Assessment And Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC, or the Commission) is considering issuance of an...

  20. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... have a significant effect on the quality of the human environment (75 FR 14638). This exemption is... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption 1.0 Background...

  1. 75 FR 16523 - FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... FR 14635). This exemption is effective upon issuance. Dated at Rockville, Maryland, this 26th day of... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Exemption 1.0...

  2. 75 FR 16094 - Upper Peninsula Power Company; North American Hydro Holdings, LLC; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Upper Peninsula Power Company; North American Hydro Holdings, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene March 24, 2010. On March 17, 2010, Upper Peninsula...

  3. 76 FR 28481 - Carolina Power & Light Company; Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company; Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to Title...

  4. 77 FR 47618 - Algonquin Power Company; Notice of Application Accepted for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ..., 2012. d. Applicant: Algonquin Power Company. e. Name of Project: Lower Beaver Falls Hydroelectric Project. f. Location: The proposed project is located on the Beaver River in Lewis County, New York. g.... Description of Request: The licensee proposes to amend the license for the Lower Beaver Falls...

  5. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  6. 75 FR 12230 - Idaho Power Company, Idaho; Notice of Availability of Draft Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Code of Federal Regulations (CFR) part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Idaho Power Company's application for license for the Swan Falls Project (FERC Project No... Impact Statement for the Swan Falls Project March 5, 2010. In accordance with the National...

  7. 75 FR 53964 - Idaho Power Company, Idaho; Notice of Availability of Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Impact Statement for the Swan Falls Project August 26, 2010. In accordance with the National... Office of Energy Projects has reviewed Idaho Power Company's application for license for the Swan Falls... alternatives for relicensing the Swan Falls Project. The final EIS documents the views of governmental...

  8. 75 FR 40797 - Upper Peninsula Power Company; Notice of Application for Temporary Amendment of License and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... inspection: a. Type of Application: Request for drought-based temporary variance of the reservoir elevations... Power Company (UPPCO) is requesting a drought-based temporary variance to the reservoir elevation and minimum flow requirements at the Hoist Development. The variance would be in effect from the date...

  9. 77 FR 17465 - Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... Power Company. e. Name of Project: Middle Chattahoochee Project. f. Location: The project is located on the Chattahoochee River in Harris and Muscogee Counties, Georgia, and Lee and Russell Counties... Highland Dam of the Middle Chattahoochee Project. The proposed weir will act to support the...

  10. 75 FR 10838 - Pacific Gas and Electric Company; Diablo Canyon Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... environment (75 FR 8152; dated February 23, 2010). This exemption is effective upon issuance. Dated at... COMMISSION Pacific Gas and Electric Company; Diablo Canyon Power Plant; Exemption 1.0 Background Pacific Gas... law, and will not endanger life or property or the common defense and security, and are otherwise...

  11. 77 FR 1674 - Ocean Renewable Power Company Maine, LLC; Notice of Availability of Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ocean Renewable Power Company Maine, LLC; Notice of Availability of Environmental Assessment for the Proposed Cobscook Bay Tidal Energy Project In accordance with the National Environmental Policy Act of 1969 and...

  12. 75 FR 8152 - Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13926). There will be no... FR 13926 (March 27, 2009)]. With its request to extend the implementation deadline, the licensee... COMMISSION Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and...

  13. APEX (Air Pollution Exercise) Volume 6: Industrialist's Manual No. 1, Shear Power Company.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Research Triangle Park, NC. Office of Manpower Development.

    The Industrialist's Manual No. 1, Shear Power Company is part of a set of 21 manuals (AA 001 009-001 029) used in APEX (Air Pollution Exercise), a computerized college and professional level "real world" game simulation of a community with urban and rural problems, industrial activities, and air pollution difficulties. The first two sections,…

  14. Schooling, Testing, and Jobs: A Re-examination of Griggs, et al. v. Duke Power Company

    ERIC Educational Resources Information Center

    Francis, Anne M.

    1975-01-01

    Examines legal concepts embodied in the U.S. Supreme Court's decision in Griggs v. Duke Power Company and argues that the Griggs decision raises questions about the traditional use by schools and colleges of grades and test scores as criteria for the hiring, admissions, certification, and promotion of instructors and students. (JG)

  15. Alabama Education Quick Facts, 2007

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2007

    2007-01-01

    This document is a quick look at general information about Alabama schools. The document contains 11 sections: (1) state statistics; (2) Alabama public schools, 2006-07; (3) Alabama state board of education members; (4) financial data; (5) school size and enrollment; (6) transportation and school meals; (7) graduation requirements; (8) additional…

  16. 75 FR 63212 - Northern States Power Company-Minnesota; Notice of Withdrawal of Application for Amendment to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ..., 2010 (75 FR 23817). However, by letter dated September 16, 2010, the licensee withdrew the proposed... COMMISSION Northern States Power Company--Minnesota; Notice of Withdrawal of Application for Amendment to... of Northern States Power Company, a Minnesota corporation (the licensee), doing business as...

  17. 75 FR 80545 - Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Register notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that... COMMISSION Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental... Carolina Power & Light Company (the licensee), for operation of the H. B. Robinson Steam Electric...

  18. 75 FR 4426 - Florida Power and Light Company; Turkey Point Nuclear Generating Units 3 and 4; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... COMMISSION Florida Power and Light Company; Turkey Point Nuclear Generating Units 3 and 4; Environmental... to Florida Power and Light Company (the licensee), for operation of the Turkey Point Units 3 and 4... National Pollution Discharge Elimination System permit are needed. No effects on the aquatic or...

  19. 77 FR 71588 - Alaska Electric Light and Power Company, et al.; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Energy Regulatory Commission Alaska Electric Light and Power Company, et al.; Notice of Petition for Declaratory Order ] Alaska Electric Light and Power Company....... Docket Nos. EL13-24-000; Project No. 2307... Commission's (Commission) Rules of Practice and Procedure 18 CFR 385.207(a)(2), Alaska Electric Light...

  20. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... environment 75 FR 8410, February 24, 2010. This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Facility Operating License No....

  1. 77 FR 28371 - Lockhart Power Company, Inc.; Notice of Application Accepted for Filing and Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ...; (4) a powerhouse containing a single 1.24-megawatt turbine-generator unit; (5) a 510-foot-long...-hours annually. Lockhart Power Company, Inc. proposes to repair or upgrade the turbine unit and return... Energy Regulatory Commission Lockhart Power Company, Inc.; Notice of Application Accepted for Filing...

  2. 75 FR 61467 - Garland Power Company; Supplemental Notice that Initial Market-Based Rate Filing Includes Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Garland Power Company; Supplemental Notice that Initial Market- Based Rate... notice in the above-referenced proceeding of Garland Power Company's application for market-based...

  3. 78 FR 61946 - Hillman Power Company, L.L.C.; Notice of Initiation of Proceeding And Refund Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hillman Power Company, L.L.C.; Notice of Initiation of Proceeding And Refund..., L.L.C. Hillman Power Company, L.L.C., 144 FERC ] 61,245 (2013). The refund effective date in...

  4. 75 FR 71107 - Upper Peninsula Power Company; UP Hydro; Notice of Application for Transfer of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Energy Regulatory Commission Upper Peninsula Power Company; UP Hydro; Notice of Application for Transfer..., Upper Peninsula Power Company (transferor) and UP Hydro (transferee) filed an application for transfer... under http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to...

  5. 78 FR 28835 - Salton Sea Power Generation Company; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Salton Sea Power Generation Company; Supplemental Notice That Initial Market... in the above-referenced proceeding of Salton Sea Power Generation Company's application for...

  6. 78 FR 8193 - In the Matter of Virginia Electric and Power Company, and Old Dominion Electric Cooperative; ESP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... COMMISSION In the Matter of Virginia Electric and Power Company, and Old Dominion Electric Cooperative; ESP... Power Company, North Anna ESP Site, was published in the Federal Register on September 10, 2012 (77 FR... conforming amendment to the ESP-003 complies with the standards and requirements of the Atomic Energy Act...

  7. 78 FR 26357 - Alaska Electric Light & Power Company; Notice of Intent To File License Application, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Energy Regulatory Commission Alaska Electric Light & Power Company; Notice of Intent To File License.... Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional... Electric Light & Power Company (AEL&P). e. Name of Project: Salmon and Annex Creek Hydroelectric Project....

  8. Tampa Electric Company, Polk Power Station Unit No. 1, preliminary public design report

    SciTech Connect

    1994-06-01

    This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE`s project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

  9. Alabama and SREB

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2009

    2009-01-01

    The Southern Regional Education Board (SREB) is a nonprofit organization that works collaboratively with Alabama and 15 other member states to improve education at every level--from pre-K to postdoctoral study--through many effective programs and initiatives. SREB's "Challenge to Lead Goals for Education", which call for the region to lead the…

  10. Academic Standards in Alabama

    ERIC Educational Resources Information Center

    A+ Education Partnership, 2014

    2014-01-01

    Education policymakers and educators in Alabama are committed to improving the state's public education system to ensure that students gain the knowledge and skills they need to graduate from high school ready for real life. The state is on the path to implementing higher academic standards--the College and Career Ready Standards--which lay a…

  11. Homonegativity among Alabama Counselors

    ERIC Educational Resources Information Center

    Satcher, Jamie; Leggett, Mark

    2006-01-01

    Members of the Alabama Counseling Association were surveyed to examine the extent to which they demonstrate homonegativity (prejudicial attitudes toward homosexuality). The majority of the counselors did not appear to approach homosexuality from traditional prejudices, although almost one-third believed homosexuality to be immoral. The counselors…

  12. Alabama's Decree of Difficulty.

    ERIC Educational Resources Information Center

    Evelyn, Jamilah

    1998-01-01

    Nearly 30 years after the official end of de jure segregation, Alabama is struggling to level educational opportunities for both black and white citizens. Critics say this goal will be difficult to reach unless the state hires and retains more black faculty. Only recently, because of a court decree, are state black institutions getting equal…

  13. 77 FR 134 - In the Matter of Yankee Atomic Electric Company; Northeast Utilities; NSTAR (Yankee Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... opportunity to request a hearing was published in the Federal Register on July 14, 2011 (76 FR 41532). No... COMMISSION In the Matter of Yankee Atomic Electric Company; Northeast Utilities; NSTAR (Yankee Nuclear Power Station); Order Approving Application Regarding Proposed Merger I Yankee Atomic Electric Company...

  14. 76 FR 39445 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... issuance of the renewed licenses was published in the Federal Register on June 17, 2008 (73 FR 34335). For... COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2... Company--Minnesota (licensee), the ] operator of Prairie Island Nuclear Generating Plant, Units 1 and...

  15. Corporate Power and Social Policy: The Political Economy of the Transnational Tobacco Companies

    PubMed Central

    Holden, Chris; Lee, Kelley

    2009-01-01

    Drawing on published tobacco document research and related sources, this article applies Farnsworth and Holden's conceptual framework for the analysis of corporate power and corporate involvement in social policy (2006) to the transnational tobacco companies (TTCs). An assessment is made of TTCs' structural power, the impact upon their structural position of tobacco control (TC) policies, and their use of agency power. The analysis suggests that, as a result of the growth of TC policies from the 1950s onwards, TTCs have had to rely on political agency to pursue their interests and attempt to reassert their structural position. The collapse of the Eastern bloc and the liberalisation of East Asian economies presented new structural opportunities for TTCs in the 1980s and 1990s, but the development of globally coordinated TC policies facilitated by the World Health Organisation's Framework Convention on Tobacco Control has the potential to constrain these. PMID:20228951

  16. Unconventional gas - exploratory drilling, Tuscaloosa County, Alabama

    SciTech Connect

    Not Available

    1982-09-01

    BF Goodrich owns and operates a large tire manufacturing plant located in Tuscaloosa, Alabama. This plant consumes approximately 3000 MCF of natural gas daily in generating steam for the manufacturing process. In addition, Goodrich has other facilities with requirements for gaseous fuels. Because of increased costs for gas and oil, and forecasted shortages of gas, Goodrich is investigating alternative sources for energy. In the Tuscaloosa vicinity, Goodrich studied in depth the possibility of obtaining methane gas from coal beds. In this process, BF Goodrich worked with the Unites States Bureau of Mines, the University of Alabama School of Mines and Energy Development and various other companies having experience in coalbed degasification. The information available to Goodrich led to the conclusion that degasification may have the potential of meeting the Company's energy and financial objectives. With DOE funding, a test well was drilled and various analyses necessary to verify this potential were made. BF Goodrich management would contemplate investing Goodrich capital to develop production wells if the test well analyses indicated such development to be feasible and the economics of production were consistent with corporate objectives for return on investment. The completed analyses, however, indicate that investment in this program is not justified at this time. 20 figures, 13 tables.

  17. 75 FR 3942 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... promulgating its revisions to 10 CFR Part 73 as discussed in a Federal Register (FR) notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that affect radiation exposures to... impact (Part 73, Power Reactor Security Requirements, 74 FR 13926 through 13967, dated March 27,...

  18. Alabama Education News. Volume 30, Number 7

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  19. Alabama Education News. Volume 30, Number 3

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  20. Alabama Education News. Volume 30, Number 6

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  1. Alabama Education News. Volume 30, Number 8

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  2. Alabama Education News. Volume 27, Number 8

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2004-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama," as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  3. Alabama Education News. Volume 27, Number 6

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2004-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  4. Alabama Education News. Volume 28, Number 5

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2005-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  5. Alabama Education News. Volume 34, Number 4

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2011-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  6. Alabama Education News. Volume 31, Number 4

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  7. Alabama Education News. Volume 32, Number 2

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  8. Alabama Education News. Volume 31, Number 3

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  9. Alabama Education News. Volume 27, Number 9

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2004-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  10. Alabama Education News. Volume 33, Number 4

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  11. Alabama Education News. Volume 34, Number 1

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama," as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  12. Alabama Education News. Volume 33, Number 8

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  13. Alabama Education News. Volume 27, Number 5

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2004-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  14. Alabama Education News. Volume 34, Number 2

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  15. Alabama Education News. Volume 34, Number 3

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2010-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  16. Alabama Education News. Volume 30, Number 5

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  17. Alabama Education News. Volume 29, Number 5

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  18. Alabama Education News. Volume 31, Number 2

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2007-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  19. Alabama Education News. Volume 30, Number 2

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  20. Alabama Education News. Volume 29, Number 8

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  1. Alabama Education News. Volume 28, Number 7

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2005-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  2. Environmental review of Potomac Electric Power Company's proposed Station H Element I

    SciTech Connect

    Not Available

    1990-04-01

    The report has been conducted to evaluate the potential impacts to environmental and cultural resources from the proposed construction and operation of Element I (the combustion turbine portion) of the Station H power plant facility at Potomac Electric Power Company's Dickerson site. This review also presents an evaluation of air quality impacts of Elements I and II (combustion turbine and combined cycle components of the facility) and an assessment of compliance with state and Federal air quality regulations (primarily the ambient air quality standards and the air quality impact requirements of PSD regulations). Results of the Environmental Review analysis are used as the basis for establishing preliminary recommended licensing conditions for operating the proposed facility. These recommendations are also included in the report.

  3. High SO{sub 2} removal efficiency testing: Results of DBA and sodium formate additive tests at Southwestern Electric Power company`s Pirkey Station

    SciTech Connect

    1996-05-30

    Tests were conducted at Southwestern Electric Power Company`s (SWEPCo) Henry W. Pirkey Station wet limestone flue gas desulfurization (FGD) system to evaluate options for achieving high sulfur dioxide removal efficiency. The Pirkey FGD system includes four absorber modules, each with dual slurry recirculation loops and with a perforated plate tray in the upper loop. The options tested involved the use of dibasic acid (DBA) or sodium formate as a performance additive. The effectiveness of other potential options was simulated with the Electric Power Research Institute`s (EPRI) FGD PRocess Integration and Simulation Model (FGDPRISM) after it was calibrated to the system. An economic analysis was done to determine the cost effectiveness of the high-efficiency options. Results are-summarized below.

  4. 77 FR 133 - In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... opportunity to request a hearing was published in the Federal Register on July 14, 2011 (76 FR 41530). No... COMMISSION In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck Plant); Order Approving Application Regarding Proposed Merger I Connecticut Yankee Atomic Power...

  5. 76 FR 53497 - Florida Power and Light Company; St. Lucie Plant, Units 1 and 2; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... COMMISSION Florida Power and Light Company; St. Lucie Plant, Units 1 and 2; Environmental Assessment and... IV.A.2, for Facility Operating License Nos. DPR-67 and NPF-16, issued to Florida Power and Light... quality or quantity of non- radiological effluents. No changes to the National Pollution...

  6. 75 FR 73134 - Florida Power and Light Company, St. Lucie Plant, Units 1 and 2; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... COMMISSION Florida Power and Light Company, St. Lucie Plant, Units 1 and 2; Environmental Assessment and..., Section 26.9, for Facility Operating License Nos. DPR-67 and NPF-16, issued to Florida Power and Light... National Pollution Discharge Elimination System permit are needed. No effects on the aquatic or...

  7. 78 FR 16490 - Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued Project Operation On February 18, 2011, the Jersey Central Power and Light...

  8. 76 FR 25378 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... December 14, 2010 (75 FR 77913). However, by letter dated April 26, 2011, the licensee withdrew the... COMMISSION Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and... Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located...

  9. 75 FR 57535 - Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Federal Register on June 14, 2010 (75 FR 33653). On September 10, 2010, the NRC approved and issued... COMMISSION Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To... application dated April 2, 2009, as supplemented March 30, 2010, Connecticut Yankee Atomic Power...

  10. 75 FR 6071 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ..., 2009 (74 FR 20744). However, by letter dated January 19, 2010, the licensee withdrew the proposed... COMMISSION Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and 3... Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and...

  11. 75 FR 58445 - Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental... operation of Peach Bottom Atomic Power Station (PBAPS), Unit Nos. 2 and 3, located in York and...

  12. 75 FR 8322 - Tatanka Wind Power, LLC, Complainant, v. Montana-Dakota Utilities Company, a Division of MDU...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Tatanka Wind Power, LLC, Complainant, v. Montana-Dakota Utilities Company, a... and Order Nos. 2003 and 2003-A,\\1\\ Tatanka Wind Power, LLC (Complainant) filed a formal...

  13. 78 FR 49305 - Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-13

    ... COMMISSION Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2; Application... Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission... Nuclear Power Plant, Unit Nos. 1 and 2, respectively, located in Somervell County, Texas. The...

  14. 75 FR 9625 - Northern States Power Company-Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    .... As noted in the final Power Reactor Security Requirements rule (74 FR 13925, March 27, 2009), the... COMMISSION Northern States Power Company--Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2... holder of Facility Operating License Nos. DPR-42 and DPR-60, which authorize operation of the...

  15. Sharing the opportunity cost among power companies to support hydropower-to-environment water transfers

    NASA Astrophysics Data System (ADS)

    Tilmant, Amaury; Marques, Guilherme

    2016-04-01

    Among the environmental impacts caused by dams, the alteration of flow regimes is one of the most critical to river ecosystems given its influence in long river reaches and its continuous pattern. Provided it is technically feasible, the reoperation of hydroelectric reservoir systems can, in principle, mitigate the impacts on degraded freshwater ecosystems by recovering some of the natural flow regime. The typical approach to implement hydropower-to-environment water transfers focuses on the reoperation of the dam located immediately upstream of the environmentally sensitive area, meaning that only one power station will bear the brunt of the benefits forgone for the power sector. By ignoring the contribution of upstream infrastructures to the alteration of the flow regime, the opportunity cost associated with the restoration of a flow regime is not equitably distributed among the power companies in the river basin, therefore slowing the establishment of environmental flow programs. Yet, there is no criterion, nor institutional mechanisms, to ensure a fair distribution of the opportunity cost among power stations. This paper addresses this issue by comparing four rules to redistribute the costs faced by the power sector when environmental flows must be implemented in a multireservoir system. The rules are based on the the installed capacity of the power plants, the live storage capacity of the reservoirs, the ratio between the incremental flows and the live storage capacity, and the extent of the storage services; that is, the volume of water effectively transferred by each reservoir. The analysis is carried out using the Parana River Basin (Brazil) as a case study.

  16. 76 FR 54259 - Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339, North Anna Power Station...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Virginia Electric and Power Company, Docket Nos. 50-338 and 50- 339, North Anna Power Station... Duty Programs,'' for Facility Operating License Nos. NPF-4 and NPF-7, issued to Virginia Electric...

  17. Engineering evaluation of magma cooling-tower demonstration at Nevada Power Company's Sunrise Station

    NASA Astrophysics Data System (ADS)

    1980-11-01

    The Magma Cooling Tower (MCT) process utilizes a falling film heat exchanger integrated into an induced draft cooling tower to evaporate waste water. A hot water source such as return cooling water provides the energy for evaporation. Water quality control is maintained by removing potential scaling constituents to make concentrations of the waste water possible without scaling heat transfer surfaces. A pilot-scale demonstration test of the MCT process was performed from March 1979 through June 1979 at Nevada Power Company's Sunrise Station in Las Vegas, Nevada. The pilot unit extracted heat from the powerplant cooling system to evaporate cooling tower blowdown. Two water quality control methods were employed: makeup/sidestream softening and fluidized bed crystallization. The 11 week softening mode test was successful.

  18. Failure analysis report: Heat exchanger tubes geothermal binary power plant, Magma Electric Company, East Mesa, California

    SciTech Connect

    Anliker, Dennis M.; Ellis, Peter F. II

    1982-05-01

    Radian received twelve sections of heat exchanger tubing from the Magma Electric Company's 10MW(e) East Mesa binary geothermal power plant. Three tube sections were received from each of four shell and tube heat exchangers (HX1, Hx6, HX8, and Hx10) of the isobutane vaporizer train. All samples were taken from the upper few rows of tubes. Two months later, four more tube sections were received. These four sections were taken from the lower rows of heat exchangers 1, 6 (two sections), and 10. Radian was requested to investigate the cause of severe pitting failure of these heat exchanger tubes. This report is part of a continuing DOE effort to gain insight into the service life of component materials employed in geothermal energy utilization.

  19. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... securities of power supply companies from section 9(a)(2) of the Act. 250.14 Section 250.14 Commodity and... of securities of power supply companies from section 9(a)(2) of the Act. (a) An electric utility... exempt from section 9(a)(2) of the Act with respect to the acquisition of any security of a power...

  20. Evaluation of the Alabama Reading Initiative, 1999-2000.

    ERIC Educational Resources Information Center

    O'Neal, Marcia R.; Spor, Mary W.

    A study examined the effectiveness and the impact of preservice instruction of the second year of the Alabama Reading Initiative (ARI), which is designed to achieve 100% literacy by targeting reading performance of beginning reading and first-grade students, to expand the reading power for second- through twelfth-grade students, and to intervene…

  1. Wetlands mitigation: Partnership between an electric power company and a federal wildlife refuge

    USGS Publications Warehouse

    Perry, M.C.; Sibrel, C.B.; Gough, G.A.

    1996-01-01

    Twenty-three acres of a degraded section of Patuxent Research Refuge in Laurel, Maryland were converted to wetland habitat by the Baltimore Gas and Electric Company in 1994. The wetlands were created as mitigation for 14 acres of wetlands that were impacted as part of the construction of a 5.3 mile 500kv overhead transmission line on the Refuge. The area consists of a created forested wetland (13.5 acres), a seasonally inundated green-tree reservoir (6.5 acres), and an impounded pond wetland (3 acres). Construction included the planting of 6,131 trees, 4,276 shrubs, and 15,102 emergent plants. Part of the site has been studied intensively since completion and survival of trees and shrubs after 2 years was 88%. Measurements of these transplants, have shown growth greater than on other created sites in Maryland. Grasses and other herbaceous vegetation were dominant plants in the meter-square plots in the first two years of sampling of the created forested wetland. Wildlife surveys for birds, mammals, amphibians, and reptiles have revealed diverse communities. Although these communities represent species consistent with open habitat, more typical forest species should colonize the area as it undergoes succession into a more mature forested wetland. The creation, management, and research of this mitigation site represents an excellent example of a partnership between a private electric power company and a federal wildlife refuge. This partnership has increased local biodiversity and improved regional water quality of the Patuxent River and the Chesapeake Bay.

  2. Wetlands mitigation: Partnership between an electric power company and a federal wildlife refuge

    NASA Astrophysics Data System (ADS)

    Perry, Matthew C.; Sibrel, Cynthia B.; Gough, Gregory A.

    1996-11-01

    Nine hectares (23 acres) of a degraded section of Patuxent Research Refuge in Laurel, Maryland, USA, were converted to wetland habitat by the Baltimore Gas and Electric Company in 1994. The wetlands were created as mitigation for 5.7 ha (14 acres) of wetlands that were impacted as part of the construction of an 8.5-km (5.3-mile) 500-kV overhead transmission line on the refuge. The area consists of a created forested wetland of 5.5 ha (13.5 acres), a seasonally inundated green-tree reservoir of 7.6 ha (6.5 acres), and an impounded pond wetland of 1.2 ha (3 acres). Construction included the planting of 6131 trees, 4276 shrubs, and 15,102 emergent plants. Part of the site has been studied intensively since completion and survival of trees and shrubs after two years was 88%. Measurements of these transplants have shown growth greater than on other created sites in Maryland. Grasses and other herbaceous vegetation were dominant plants in the meter-square plots in the first two years of sampling of the created forested wetland. Wildlife surveys for birds, mammals, amphibians, and reptiles have revealed diverse communities. Although these communities represent species consistent with open habitat, more typical forest species should colonize the area as it undergoes succession into a more mature forested wetland. The creation, management, and research of this mitigation site represents an excellent example of a partnership between a private electric power company and a federal wildlife refuge. This partnership has increased local biodiversity and improved regional water quality of the Patuxent River and the Chesapeake Bay.

  3. Wetlands mitigation: Parnership between an electric power company and a federal wildlife refuge

    SciTech Connect

    Perry, M.C.; Sibrel, C.B.; Gough, G.A.

    1996-11-01

    Nine hectares (23 acres) of a degraded section of Patuxent Research Refuge in Laurel, Maryland, USA, were converted to wetland habitat by the Baltimore Gas and Electric Company in 1994. The wetlands were created as mitigation for 5.7 ha (14 acres) of wetlands that were impacted as part o the construction of 8.5-km (5.3-mile) 500-kV over-head transmission line on the refuge. The area consists of a created forested wetland of 5.5 ha(13.5 acres), a seasonally inundated green-free reservoir of 7.6 ha (6.5 acres), and an impounded pond wetland of 1.2 ha (3 acres). Construction included the planting of 6131 trees, 4276 shrubs, and 15,102 emergent plants. Part of the site has been studied intensively since completion and survival of trees and shrubs after two years was 88%. Measurements of these transplants have shown growth greater than on other created sites in Maryland. Grasses and other herbaceous vegetation were dominant plants in the meter-square plots in the first two years of sampling of the created forested wetland. Wildlife surveys for birds, mammals, amphibians, and reptiles have revealed diverse communities. Although these communities represent species consistent with open habitat, more typical forest species should colonize the area as it undergoes succession into a more mature forested wetland. The creation, management, and research of this mitigation site represents an excellent example of a partnership between a private electric power company and a federal wildlife refuge. This partnership has increased local biodiversity and improved regional water quality of the Patuxent River and the Chesapeake Bay. 6 refs., 7 figs., 4 tabs.

  4. Libraries in Alabama: MedlinePlus

    MedlinePlus

    ... this page: https://medlineplus.gov/libraries/alabama.html Libraries in Alabama To use the sharing features on ... JavaScript. Birmingham American Sports Medicine Institute Sports Medicine LIBRARY 833 St. Vincent's Drive Suite 205 Birmingham, AL ...

  5. Large scale CWM utilization experiences in 600 MW Nakoso No. 8 boiler of Joban Joint Power Company

    SciTech Connect

    Ishibashi, Yoshitaka; Abe, Nobuyuki; Morimitsu, Keimei

    1994-12-31

    Japanese Electric power companies recognized the importance of utilizing coal in 1973 when the oil crisis occurred and the early introduction of coal for power generation began to be studied. Tokyo Electric Power Co., Inc. aimed at the utilization of COM (coal oil mixture) to begin with and put into the commercial operation of No. 1 and 2 COM-fired units (each 265MW) of Yokosuka Thermal Power Station in 1985. Both units have been in favorable operation with an annual consumption of approximately 600,000 tons of COM.

  6. 76 FR 19476 - Exelon Generation Company, LLC, Peach Bottom Atomic Power Station, Unit Nos. 2 and 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Exelon Generation Company, LLC, Peach Bottom Atomic Power Station, Unit Nos. 2 and 3; Exemption 1... Operating License Nos. DPR-44 and DPR-56, which authorizes operation of the Peach Bottom Atomic...

  7. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of... Dr. Tianqing Cao, Senior Seismologist, Office of Nuclear Material Safety and Safeguards, has...

  8. 76 FR 62398 - Northern States Power Company; Notice of Application To Amend License and Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Application: Amendment to License. b. Project No: 2567-041. c. Date Filed: August 23, 2011. d. Applicant: Northern States Power Company. e. Name of Project: Wissota Hydroelectric Project. f. Location: The project... include your name and contact information at the end of your comments. Please include the project...

  9. 76 FR 66052 - Northern States Power Company; Notice of Application To Amend License and Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Northern States Power Company; Notice of Application To Amend License and Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has...

  10. 75 FR 8410 - Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that affect... impact (March 27, 2009, 74 FR 13967). The NRC staff's safety evaluation will be provided as part of a... COMMISSION Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2;...

  11. 76 FR 20652 - Idaho Power Company; Notice of Application of Land Management Plan Update for the Bliss, Upper...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Update for the Bliss, Upper Salmon Falls, and Lower Salmon Falls Projects and Soliciting Comments...: Idaho Power Company. e. Name of Projects: Bliss, Upper Salmon Falls, and Lower Salmon Falls..., licensee of the Bliss, Upper Salmon Falls, and Lower Salmon Falls Hydroelectric Projects, has filed...

  12. 77 FR 7142 - Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969...

  13. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... site security plans. The amendments to 10 CFR 73.55 published on March 27, 2009 (74 FR 13926... have a significant effect on the quality of the human environment (75 FR 80545 dated December 22, 2010... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption...

  14. 75 FR 63213 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering the issuance of an...

  15. 75 FR 24998 - In the Matter of Florida Power and Light Company: Turkey Point Nuclear Plant; Independent Spent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... to prohibit unauthorized access to sensitive information and to prohibit modification of the... COMMISSION In the Matter of Florida Power and Light Company: Turkey Point Nuclear Plant; Independent...

  16. 78 FR 47311 - Ohio Power Company; AEP Generation Resources, Inc.; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Ohio Power Company; AEP Generation Resources, Inc.; Notice of Application for Transfer of License, and Soliciting Comments and Motions to Intervene On July 19, 2013, Ohio...

  17. 78 FR 60271 - Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On September 10,...

  18. 78 FR 69848 - Birch Power Company; Notice of Proposed Revised Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ...] Birch Power Company; Notice of Proposed Revised Restricted Service List for a Programmatic Agreement..., the Secretary may establish a restricted service list for a particular phase or issue in a proceeding. The restricted service list should contain the names of persons on the service list who, in...

  19. 75 FR 41902 - License Nos. DPR-31 and DPR-41; Florida Power & Light Company; Notice of Issuance of Director's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION License Nos. DPR-31 and DPR-41; Florida Power & Light Company; Notice of Issuance of Director's Decision Under 10 CFR 2.206 Notice is hereby given that the Director, Office of Nuclear Reactor Regulation, has issued a Director's Decision with...

  20. 77 FR 36300 - In the Matter of Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Confirmatory Order...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... COMMISSION In the Matter of Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Confirmatory Order... Regulatory Commission (NRC or the Commission) issued a Confirmatory Order to Connecticut Yankee Atomic...

  1. 78 FR 6318 - Algonquin Power Company; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Power Company. e. Name of Project: Upper Beaver Falls Hydroelectric Project (P- 2593-030) and Lower Beaver Falls Hydroelectric Project (P-2823-019). f. Location: The Upper and Lower Beaver Falls Hydroelectric Projects are located on the Beaver River in the Towns of Croghan and New Bremen in Lewis...

  2. 78 FR 43189 - Birch Power Company; Notice of Application Tendered for Filing With the Commission and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Birch Power Company; Notice of Application Tendered for Filing With the...-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal...

  3. 78 FR 28836 - Vulcan/BN Geothermal Power Company; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Vulcan/BN Geothermal Power Company; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding...

  4. 78 FR 49784 - Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3, Notice of Public Meeting on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... (NRC) is correcting a notice that was published in the Federal Register on August 7, 2013 (78 FR 48203... . Correction In the Federal Register (FR) on August 7, 2013, in FR Doc. 2013- 19054, on page 48203, the NRC... COMMISSION Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3, Notice of Public Meeting...

  5. 75 FR 44292 - Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ...-AA90) published in the Federal Register on April 26, 1991 (56 FR 18997); and (C) The Nuclear Energy... contrary to the rationale for rulemaking, as discussed in 56 FR 18997. On October 26 and December 2, 2009... Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of Issuance of...

  6. 76 FR 11521 - Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company-Minnesota; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... (76 FR 9827), which informed the public that the Nuclear Regulatory Commission was considering the issuance of amendments to Facility Operating License Nos. DPR-42 and DPR-60, respectively, for the Prairie... COMMISSION Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company--Minnesota;...

  7. 75 FR 6225 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... revisions to 10 CFR part 73, as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967... Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee currently maintains a security system... COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant Units 1 and...

  8. 75 FR 3946 - License Nos. DPR-42 and DPR-60; Northern States Power Company; Prairie Island Nuclear Generating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ...) published in the Federal Register on April 26, 1991 (56 FR 18997); and (C) Nuclear Energy Institute's (NEI...'' (56 FR 18997). The NRC is treating the petitioner's request pursuant to 10 CFR 2.206, ``Requests for... COMMISSION License Nos. DPR-42 and DPR-60; Northern States Power Company; Prairie Island Nuclear...

  9. 75 FR 30392 - York Haven Power Company, LLC; Notice of Dispute Resolution Panel Meeting and Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Energy Regulatory Commission York Haven Power Company, LLC; Notice of Dispute Resolution Panel Meeting and Technical Conference May 24, 2010. On May 19, 2010, Commission staff, in response to the filing of... Panel will hold a technical conference at the time and place noted below. The technical conference...

  10. 76 FR 78631 - Appalachian Power Company; Notice of Designation of Certain Commission Personnel as Non-Decisional

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Appalachian Power Company; Notice of Designation of Certain Commission Personnel as Non-Decisional Commission staff members Jon Cofrancesco (Office of Energy Projects (202)...

  11. Alabama Public Library Service: 1998 Annual Report.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) is responsible for receiving and administering federal and state funds for the more than 200 public libraries in Alabama. This document represents the annual report for the Alabama Public Library Service for fiscal year 1998. Information is reported under the following categories: Evaluation and Research;…

  12. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  13. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  14. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  15. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  16. 33 CFR 117.101 - Alabama River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Alabama River. 117.101 Section 117.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements Alabama § 117.101 Alabama River. (a) The...

  17. Alabama Public Library Service 1996 Annual Report.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service is charged with improving library services throughout Alabama to ensure that all citizens have access to quality library and information services. The agency is responsible for administering federal and state funds for the more than 200 public libraries in Alabama. Building renovations were completed in April…

  18. Management of the geomagnetically induced current risks on the national grid company's electric power transmission system

    NASA Astrophysics Data System (ADS)

    Erinmez, I. Arslan; Kappenman, John G.; Radasky, William A.

    2002-03-01

    The National Grid Company plc (NGC) is the owner and operator of one of the world's largest privatised high-voltage electric power transmission systems in England and Wales at 400 and 275kV. As owner operator it is responsible for the secure and reliable delivery of electrical energy to all the 25 million electricity supply customers in England and Wales. The transmission and distribution systems in UK have experienced significant effects during past geomagnetic storm events especially during solar cycles 21 and 22. These effects included generator reactive power output swings, voltage dips, negative sequence alarms and transformer failures. Geomagnetically induced current (GIC) monitoring was installed in 1989 and operational procedures were put in place based on global solar weather forecasts. These measures were not capable of delivering reliable information and thus gave many false operational alarms. Their only real use was for post event forensic purposes. Since the cycle 22 solar peak activity the UK transmission system has developed to become more meshed, heavily loaded and dependent on the availability of reactive compensation equipment for voltage control. NGC carried out GIC impact risk assessment in 1998. This reviewed available options for managing this risk including investigation of blocking measures, a reliable local GIC forecast, GIC monitoring, a review of transmission equipment capabilities to withstand GIC conditions and operational procedures to manage the risk. As a result of the risk assessment NGC completed installation of a Metatech Spacecast/Powercast space weather forecasting system in May 1999. EPRI Sunburst 2000 based transformer monitoring systems were fully integrated in January 2000 in time for peak solar storm activity in solar cycle 23. This paper will describe the risk analysis undertaken, the risk management processes put in place and the performance of the forecasting and monitoring systems, respectively.

  19. Alabama Counseling Association Journal, 1996.

    ERIC Educational Resources Information Center

    Farrell, R. Joel, II, Ed.

    1996-01-01

    This document consists of the two issues of the "Alabama Counseling Association Journal" published during 1996. The focus of the journal is on communicating ideas and information that will help counselors to implement the counseling role and develop the profession of counseling. Issue number 1 includes the following articles: "Commitment through…

  20. Alabama Counseling Association Journal, 1995.

    ERIC Educational Resources Information Center

    Abbott, Gypsy, Ed.; Elliott, Glenda R., Ed.

    1995-01-01

    Communicating ideas and information that will help counselors to implement the counseling role and develop the profession of counseling is the purpose of this journal. The first issue in volume 21 contains the following articles: "Policies and Procedures for Reporting Child Abuse in Alabama: Considerations for Counselors, Teachers, and School…

  1. Alabama's Child Nutrition Certification Program.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery. Div. of Administration and Finance.

    This handbook presents the plan for the Alabama computerized certification program for school food service employees. The first section contains the following information and materials pertaining to the child nutrition certification program: rationale; position titles (Child Nutrition Program Director or Supervisor, Child Nutrition Program…

  2. Design of a 4 x 550 MW wet FGD systems for Taiwan Power Company`s Taichung Units 5-8

    SciTech Connect

    Polster, M.; Lindberg, D.S.

    1995-06-01

    Because of the interlude between Phase I and Phase II implementation of the 1990 Clean Air Act Amendments, coupled with uncertainty regarding the future market for SO{sub 2} allowances, FGD activity in the U.S. has slowed considerably. As a result, many current developments in FGD design can best be seen in international projects. Due to recent legislation in Taiwan, Taiwan Power Company (TPC) must install FGD systems on many of its coal fired plants including four new 550 MW units at the Taichung Plant in central Taiwan. These systems will produce wallboard grade gypsum and incorporate gas-gas reheat and a complete waste water treatment system. This paper will summarize the design of the Taichung FGD system with emphasis on differences in approach between the TPC design and common designs in the U.S. The paper will also focus on measures used to optimize costs to meet TPC`s aggressive budget constraints.

  3. 77 FR 34037 - Georgia-Alabama-South Carolina System of Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... FR 13594 that proposed new rate schedules to replace the current wholesale power schedules for the... Southeastern Power Administration Georgia-Alabama-South Carolina System of Projects AGENCY: Southeastern Power... should be submitted to: Kenneth E. Legg, Administrator, Southeastern Power Administration, Department...

  4. 75 FR 19963 - Florida Gas Transmission Company, LLC; Transcontinental Gas Pipe Line Company, LLC; Florida Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Energy Regulatory Commission Florida Gas Transmission Company, LLC; Transcontinental Gas Pipe Line... Transcontinental Gas Pipe Line Company, LLC (Transco) in the above referenced dockets. The EA assesses the... pig launcher in Grand Bay, Alabama (MP 8.8); One new Over Pressure Protection Regulator Station...

  5. 75 FR 28595 - Wisconsin Power River Company; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... River Company, P.O. Box 19001, Green Bay, Wisconsin 54307, (920) 433-1094. i. FERC Contact: Jade Alvey at (202) 502-6864 or Jade.Alvey@ferc.gov . j. Deadline for filing comments: June 14, 2010....

  6. Consolidated Compressed Air System Reduces Power Consumption and Energy Costs (Augusta Newsprint Company)

    SciTech Connect

    2002-02-01

    Augusta Newsprint Company consolidated two compressed air systems at its facility in Augusta, GA. The results are a more streamlined system, added storage capacity, backflow prevention, and the elimination of unused equipment.

  7. 77 FR 56270 - CSX Transportation, Inc.-Temporary Trackage Rights Exemption-Alabama Great Southern Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ... Surface Transportation Board CSX Transportation, Inc.--Temporary Trackage Rights Exemption-- Alabama Great... AGS and CSXT in Birmingham, Ala., near 14th Street at milepost 143.5 and the connection with the trackage of The Kansas City Southern Railway Company (KCSR) near 27th Avenue in Meridian, Miss.,...

  8. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or

  9. Evaluating the operational changes in the Alabama and Chattahoochee basins

    SciTech Connect

    Johnson, J.K.; Mittelstadt, R.I.

    1995-12-31

    During the 1950`s and 1970`s, the Corps of Engineers constructed three major storage projects on the headwaters of the Alabama-Coosa-Tallapoosa Rivers, referred to as the Alabama Basin and Apalachicola-Chattahoochee Rivers, referred to as the Chattahoochee Basins in northern Georgia. Carters and Allatoona are located in the Alabama Basin while Buford is located in the Chattahoochee Basin. The three projects have 1.8 billion cubic meters (1.5 million acre-feet) of conservation storage, and can be regulated for navigation, hydropower, recreation, water supply, water quality, and for fish and wildlife purposes. Above the conservation pools is additional space reserved for flood control. For many years, the conservation storage at the three projects has been regulated primarily for hydropower and navigation, although maintaining the reservoirs at near full pool during the recreation season has taken on increased importance. More recently, rapid growth and development in Atlanta and the surrounding area have led to proposals for reallocating much of this storage to water supply. These reallocations could have an impact on downstream river uses, including power production at twenty-seven Federal and non-Federal hydroelectric projects. The Mobile District, Corps of Engineers, is conducting a comprehensive study of the Alabama and Chattahoochee Basins in order to evaluate impacts of the proposed changes as well as other possible future changes in reservoir system operation. This study is being conducted in partnership with the States of Alabama, Florida, and Georgia. A major objective of the study will be the development of a long range water budget and water management strategy. This strategy will enable the three states to effectively coordinate the management of the basins` water resources in concert with appropriate Federal agencies.

  10. 75 FR 17707 - Alaska Power & Telephone Company; Notice of Declaration of Intention and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... & Telephone Company. e. Name of Project: Neck Lake Hydroelectric Project. f. Location: The proposed Neck Lake Hydroelectric Project will be located on Neck Lake outlet stream, near the community of Whale Pass, Alaska, (T... Project: The proposed Neck Lake Hydroelectric Project would consist of: (1) A small reservoir; (2) a...

  11. Environmental parameters of the Tennessee River in Alabama. 2: Physical, chemical, and biological parameters. [biological and chemical effects of thermal pollution from nuclear power plants on water quality

    NASA Technical Reports Server (NTRS)

    Rosing, L. M.

    1976-01-01

    Physical, chemical and biological water quality data from five sites in the Tennessee River, two in Guntersville Reservoir and three in Wheeler Reservoir were correlated with climatological data for three annual cycles. Two of the annual cycles are for the years prior to the Browns Ferry Nuclear Power Plant operations and one is for the first 14 months of Plant operations. A comparison of the results of the annual cycles indicates that two distinct physical conditions in the reservoirs occur, one during the warm months when the reservoirs are at capacity and one during the colder winter months when the reservoirs have been drawn-down for water storage during the rainy months and for weed control. The wide variations of physical and chemical parameters to which the biological organisms are subjected on an annual basis control the biological organisms and their population levels. A comparison of the parameters of the site below the Power plant indicates that the heated effluent from the plant operating with two of the three reactors has not had any effect on the organisms at this site. Recommendations given include the development of prediction mathematical models (statistical analysis) for the physical and chemical parameters under specific climatological conditions which affect biological organisms. Tabulated data of chemical analysis of water and organism populations studied is given.

  12. Power Systems Development Facility: High Temperature, High Pressure Filtration in Gasification Operation

    SciTech Connect

    Martin, R.A.; Guan, X.; Gardner, B.; Hendrix, H.

    2002-09-18

    High temperature, high pressure gas filtration is a fundamental component of several advanced coal-fired power systems. This paper discusses the hot-gas filter vessel operation in coal gasification mode at the Power Systems Development Facility (PSDF). The PSDF, near Wilsonville, Alabama, is funded by the U.S. Department of Energy (DOE), Southern Company, and other industrial participants currently including the Electric Power Research Institute, Siemens Westinghouse Power Corporation, Kellogg Brown & Root Inc. (KBR), and Peabody Energy. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems designed at sufficient size to provide data for commercial scale-up.

  13. Alabama SEP Final Technical Report

    SciTech Connect

    Grimes, Elizabeth M.

    2014-06-30

    Executive Summary In the fall of 2010, the Alabama Department of Economic and Community Affairs (ADECA) launched the Multi-State Model for Catalyzing the National Home Energy Retrofit Market Project (Multi-State Project). This residential energy efficiency pilot program was a collaborative effort among the states of Alabama, Massachusetts, Virginia, and Washington, and was funded by competitive State Energy Program (SEP) awards through the U.S. Department of Energy (DOE). The objective of this project was to catalyze the home energy efficiency retrofit market in select areas within the state of Alabama. To achieve this goal, the project addressed a variety of marketplace elements that did not exist, or were underdeveloped, at the outset of the effort. These included establishing minimum standards and credentials for marketplace suppliers, educating and engaging homeowners on the benefits of energy efficiency and addressing real or perceived financial barriers to investments in whole-home energy efficiency, among others. The anticipated effect of the activities would be increased market demand for retrofits, improved audit to retrofit conversion rates and growth in overall community understanding of energy efficiency. The four-state collaborative was created with the intent of accelerating market transformation by allowing each state to learn from their peers, each of whom possessed different starting points, resources, and strategies for achieving the overall objective. The four partner states engaged the National Association of State Energy Officials (NASEO) to oversee a project steering committee and to manage the project evaluation for all four states. The steering committee, comprised of key program partners, met on a regular basis to provide overall project coordination, guidance, and progress assessment. While there were variances in program design among the states, there were several common elements: use of the Energy Performance Score (EPS) platform; an

  14. Federal Public Library Programs in Alabama, 1999.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) is charged with improving library services throughout the state to ensure that all citizens have access to quality library and information services. Part of this charge includes the responsibility for receiving and administering federal funds to the more than 200 public libraries in Alabama. Federal…

  15. Federal Public Library Programs in Alabama, 1998.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) is charged with improving library services throughout the state to ensure that all citizens have access to quality library and information services. Part of this charge includes the responsibility for receiving and administering federal funds to the more than 200 public libraries in Alabama. Federal…

  16. Alabama Public Library Service Annual Report, 1990.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    This annual report highlights the accomplishments of the Alabama Public Library Service (APLS) during 1990. Introductory materials include a map of Alabama's Congressional districts, photographs of the executive board of APLS, and comments from the chairman of the executive board and from APLS' director. Accomplishments are reported under the…

  17. Alabama Public Library Service Annual Report, 1999.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) is charged with improving library services throughout the state to ensure that all citizens have access to quality library and information services. The agency is responsible for receiving and administering federal and state funds for the more than 200 public libraries in Alabama. Information is reported…

  18. Alabama Allied Health Needs Assessment Study.

    ERIC Educational Resources Information Center

    Morris, Libby V.

    This study assessed the supply of and demand for allied health professionals in Alabama, focusing on the relationship between supply and demand in various workplace settings in the context of Alabama's demographics, current educational programs, and projected changes in health care. The health care professions included in the study were all fields…

  19. Accountability in Alabama Schools. Report 24.

    ERIC Educational Resources Information Center

    Alabama Education Study Commission, Montgomery.

    The Alabama Education Study Commission conducted a five-year project to find adequate measures of accountability for schools. The result, developed, implemented, and tested in 11 school districts in Alabama, was a Program Management and Budgeting (PMB) system combining elements of zero-base budgeting and management by objectives. PMB has the…

  20. Alabama Public Library Service: 1997 Annual Report.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) serves the information needs of Alabama public libraries. As a state agency, APLS is charged with improving library services throughout the state to ensure that all citizens have access to quality library and information services. The agency is responsible for receiving and administering federal and state…

  1. Alabama Education Highlights. Bulletin 1979, No. 16.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This booklet provides a chronology of public education in Alabama from 1799 to 1979. Objectives are to provide an abbreviated educational history to interested Alabamans and citizens of other states and to inspire researchers to investigate local school systems and other educational topics throughout Alabama. The document is presented in three…

  2. 76 FR 30008 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... Alabama program in the May 20, 1982, Federal Register (47 FR 22057). You can also find later actions..., 2011, Federal Register (76 FR 9700). In the same document, we opened the public comment period and... Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901 Alabama Regulatory Program...

  3. Alabama Counseling Association Journal, 1998-1999.

    ERIC Educational Resources Information Center

    Magnuson, Sandy, Ed.; Norem, Ken, Ed.

    1999-01-01

    This document consists of the two issues of the "Alabama Counseling Association Journal" that make up volume 24. Articles in Issue 1 include: (1) "Learning Comes in Many Forms" (Holly Forester-Miller); (2) "Legislative, Legal, and Sociological Aspects of Alabama's Mental Health System" (David Gamble; Jamie S. Satcher); (3) "Peer Supervision: A…

  4. 78 FR 4967 - Alabama Disaster #AL-00046

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00046 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of ALABAMA dated...

  5. 76 FR 27141 - Alabama Disaster # AL-00036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00036 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for the State of Alabama...

  6. 78 FR 22361 - Alabama Disaster #AL-00049

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00049 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of Alabama dated...

  7. 75 FR 26813 - Alabama Disaster #AL-00029

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00029 AGENCY: Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for the State of Alabama...

  8. 77 FR 7227 - Alabama Disaster #AL-00040

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00040 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for the State of Alabama...

  9. 75 FR 1420 - Alabama Disaster # AL-00025

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00025 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of Alabama dated...

  10. 78 FR 26100 - Alabama Disaster #AL-00050

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00050 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a notice of an Administrative declaration of a disaster for the State of Alabama dated...

  11. 77 FR 54490 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... approval of the Alabama program in the May 20, 1982, Federal Register (47 FR 22030). You can also find... Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901 Alabama Regulatory Program AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public...

  12. AWARE (Alabama Working at Reading Excellence).

    ERIC Educational Resources Information Center

    Alabama Univ., Tuscaloosa. Coll. of Education.

    The selected material from the Right-to-Read Institute consists of: (1) Goals of the Institute and Specific Objectives, (2) Alabama Working at Reading Excellence Program, (3) What is the Right to Read?, (4) Objectives, (5) Activities - Studies, (6) Inventory, (7) Recommendations, (8) Alabama Population Characteristics and (9) Sounds and Light for…

  13. 40 CFR 81.301 - Alabama.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Alabama. 81.301 Section 81.301 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.301 Alabama. Alabama—TSP Designated area Does not...

  14. 2008-2009 Alabama Education Report Card

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2010

    2010-01-01

    Year after year, the goal of educators, parents, and concerned citizens throughout Alabama is to provide this state's children with the highest level of quality education possible. The future of Alabama's businesses, industries, commerce, labor force, arts, humanities, and countless other areas are determined by the education that is provided to…

  15. Alabama Public Library Service Annual Report, 1989.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    This annual report highlights the accomplishments of the Alabama Public Library Service (APLS) during 1989. Introductory materials include a map of Alabama's Congressional districts, photographs of the executive board of APLS, and comments from the chairman of the executive board and from APLS' director. The following accomplishments are then…

  16. Alabama Education Quick Facts, 2009-2010

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2010

    2010-01-01

    This brochure presents state statistics; Alabama public schools 2009-10; Alabama State Board of Education members; financial data; public school size and enrollment, 2009-10 school year; transportation; school meals; school personnel, 2009-2010; graduation requirements; student assessment; additional enrollment; and dropouts in school year 2008-09.

  17. Alabama Department of Education Quick Facts, 2008

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2009

    2009-01-01

    This brochure presents state statistics; Alabama public schools 2007-08; Alabama State Board of Education members; financial data; public school size and enrollment; transportation; school meals; school personnel, 2007-2008; graduation requirements; student assessment; additional enrollment; and dropouts, 2006-07.

  18. Alabama Education Quick Facts: Plan 2020

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2013

    2013-01-01

    This brochure presents state statistics for the following categories; Alabama public schools, 2012-13; Alabama State Board of Education members; financial data, FY 2012; public school size and enrollment, 2012-13 school year; transportation, 2012-13; school meals, 2011-12; school personnel, 2012-13; graduation rates, 2010-11; graduation…

  19. Alabama's Appalachian overthrust amid exploratory drilling resurgence

    SciTech Connect

    Taylor, J.D. ); Epsman, M.L.

    1991-06-24

    Oil and gas exploration has been carried out sporadically in the Appalachian overthrust region of Alabama for years, but recently interest in the play has had a major resurgence. The Appalachian overthrust region of Alabama is best exposed in the valley and ridge physiographic province in the northeast part of the state. Resistant ridges of sandstone and chert and valleys of shales and carbonate have been thrust toward the northwest. Seismic data show that this structural style continues under the Cretaceous overlap. The surface and subsurface expression of the Alabama overthrust extends for more than 4,000 sq miles. Oil and gas have been produced for many years from Cambro-Ordovician, Ordovician, Mississippian, and Pennsylvanian rocks in the nearby Black Warrior basin in Alabama and Mississippi and the Cumberland plateau in Tennessee. The same zones are also potential producing horizons in the Alabama overthrust region.

  20. Implementation of Case-Based Reasoning System for Knowledge Management of Power Plant Construction Projects in a Korean Company

    NASA Astrophysics Data System (ADS)

    Jang, Gil-Sang

    Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing corporation-wide case-based reasoning (CBR) system for effectively managing lessons learned knowledge like experiences and know-how obtained in performing power plant construction projects. Our methodology is consisted of 10 steps: user requirement analysis, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface development, integration test. Also, to illustrate the usability of proposed methodology, the practical CBR system is implemented for the plant construction business division of ’H’ company which has international competitiveness in the field of plant construction industry. At present, our CBR system is successfully utilizing as storing, sharing, and reusing the knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  1. 78 FR 16489 - Appalachian Power Company; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...: Smith Mountain Pumped Storage Project. f. Location: Headwaters of the Roanoke River, in Bedford, Campbell, Franklin, and Pittsylvania Counties, Virginia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Frank Simms, American Electric Power Service Corporation, 40...

  2. 75 FR 4591 - Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... March 31, 2010, deadline, Power Reactor Security Requirements, 74 FR 13926, 13935 (March 27, 2009... impact made by the Commission in promulgating its revision to 10 CFR part 73, 74 FR 13967. The proposed... Commission in promulgating its revisions to 10 CFR part 73, 74 FR 13967. There will be no change...

  3. 78 FR 26401 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... licensing of production and utilization facilities (76 FR 72560; November 23, 2011) (EP Final Rule). The EP... of Spent Fuel in NRC-Approved Storage Casks at Power Reactor Sites (55 FR 29181; July 18, 1990), the... (55 FR 29185), the Commission responded to comments related to emergency preparedness for spent...

  4. 78 FR 45984 - Yankee Atomic Electric Company, Yankee Nuclear Power Station

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... (November 23, 2011; 76 FR 72560) (EP Final Rule). The EP Final Rule was effective on December 23, 2011, with... adequate protection. On page 76 FR 72563 of the Federal Register notice for the EP Final Rule, the... of Spent Fuel in NRC-Approved Storage Casks at Power Reactor Sites (55 FR 29181; July 18, 1990),...

  5. 77 FR 5817 - Ocean Renewable Power Company, Tidal Energy Project, Cobscook Bay, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ..., issue of the Federal Register (73 FR 3316). Dated: January 20, 2012. C.L. Roberge, Captain, U.S. Coast... five turbine generator units secured to the ocean floor, used for generating electricity from tidal... an underwater cable assembly to transfer electricity to a power control and grid interface...

  6. 75 FR 14635 - FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... (74 FR 13967). There will be no change to radioactive effluents that effect radiation exposures to... impact (Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27, 2009)). The licensee... effect on the probability of an accident occurring. The details of the staff's safety evaluation will...

  7. 78 FR 41057 - Notice of Availability of Environmental Assessment; Wisconsin Electric Power Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Availability of Environmental Assessment; Wisconsin Electric Power...Library'' link. Enter the docket number excluding the last three digits in the docket number field...

  8. Being in "Bad" Company: Power Dependence and Status in Adolescent Susceptibility to Peer Influence

    ERIC Educational Resources Information Center

    Vargas, Robert

    2011-01-01

    Theories of susceptibility to peer influence have centered on the idea that lower status adolescents are likely to adopt the behaviors of high status adolescents. While status is important, social exchange theorists have shown the value of analyzing exchange relations between actors to understand differences in power. To build on status-based…

  9. Tampa Electric Company, Polk Power Station Unit No. 1. Annual report, January--December 1992

    SciTech Connect

    1993-10-01

    As part of the Tampa Electric Polk Power Unit No. 1, a Texaco pressurized, oxygen-blown entrained-flow coal gasifier will convert approximately 2300 tons per day of coal (dry basis) into a medium-BTU fuel gas with a heat content of about 250 BTU/scf (LHV). Syngas produced in the gasifier flows through a high-temperature heat recovery unit which cools the gases prior to entering two parallel clean-up areas. A portion (up to 50%) of the hot syngas is cooled to 1000{degrees}F and passed through a moving bed of zinc titanate sorbent which removed sulfur containing components of the fuel gas. The project will be the first in the world to demonstrate this advanced metal oxide hot gas desulfurization technology at a commercial scale. The remaining portion of the syngas is cooled to 400{degrees}F for conventional acid gas removal. This portion of the plant is capable of processing between 50% and 100% of the dirty syngas. The cleaned low-BTU syngas is then routed to the combined cycle power generation system where it is mixed with air and burned in the gas turbine combustor. Heat is extracted from the expanded exhaust gases by a heat recovery steam generator to produce high pressure steam. This steam, along with the steam generated in the gasification process, drives a steam turbine to generate an additional 132MW of power. Internal process power consumption is approximately 62MW, and includes power for coal grinding, air separation, and feed pumps. Net output from the IGCC demonstration plant will be 260MW.

  10. Site Environmental Report for Calendar Year 2001. DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect

    Rutherford, Phil; Samuels, Sandy; Leee, Majelle

    2002-09-01

    This Annual Site Environmental Report (ASER) for 2001 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Boeing Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Closure of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2001 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway. No structural debris from buildings, released for unrestricted use, was transferred to municipal landfills or recycled in 2001.

  11. Site Environmental Report for Calendar Year 2000. DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect

    Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2001-09-01

    This Annual Site Environmental Report (ASER) for 2000 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2000 continue to indicate no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

  12. Site Environmental Report for Calendar Year 2003 DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect

    Liu, Ning; Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2004-09-30

    This Annual Site Environmental Report (ASER) for 2003 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing Rocketdyne’s Santa Susana Field Laboratory (SSFL). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2003 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  13. Pre-feasibility power generation study for the Magadi Soda Company, Magadi, Kenya

    SciTech Connect

    Not Available

    1989-01-01

    The purpose of this report is to: (a) review the extensive published and unpublished literature on the geochemistry, hydrology and geology of Lake Magadi, Kenya, and its associated hot springs; (b) based on this review of field visits, estimate the temperature in the geothermal reservoir beneath the lake; and (c) from this, develop a plan to determine the potential for the development of geothermal electric power at Lake Magadi. 6 refs., 9 figs., 2 tabs.

  14. Measured effects of wind turbine generation at the Block Island Power Company

    NASA Technical Reports Server (NTRS)

    Wilreker, V. F.; Smith, R. F.; Stiller, P. H.; Scot, G. W.; Shaltens, R. K.

    1984-01-01

    Data measurements made on the NASA MOD-OA 200-kw wind-turbine generator (WTG) installed on a utility grid form the basis for an overall performance analysis. Fuel displacement/-savings, dynamic interactions, and WTG excitation (reactive-power) control effects are studied. Continuous recording of a large number of electrical and mechanical variables on FM magnetic tape permit evaluation and correlation of phenomena over a bandwidth of at least 20 Hz. Because the wind-power penetration reached peaks of 60 percent, the impact of wind fluctuation and wind-turbine/diesel-utility interaction is evaluated in a worst-case scenario. The speed-governor dynamics of the diesel units exhibited an underdamped response, and the utility operation procedures were not altered to optimize overall WTG/utility performance. Primary findings over the data collection period are: a calculated 6.7-percent reduction in fuel consumption while generating 11 percent of the total electrical energy; acceptable system voltage and frequency fluctuations with WTG connected; and applicability of WTG excitation schemes using voltage, power, or VARS as the controlled variable.

  15. Alabama Magnet School Races toward Job Market.

    ERIC Educational Resources Information Center

    Jones, Morgan

    2002-01-01

    Describes Alabama's Brewbaker Technology Magnet High School, which was built for only $70 per square foot. Explores the relationship between its school-to-work, collaborative-learning approach and the building's design. (EV)

  16. 75 FR 51989 - Southern LNG Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... Energy Regulatory Commission Southern LNG Company, L.L.C.; Notice of Application August 16, 2010. Take notice that on August 4, 2010, Southern LNG Company, L.L.C. (Southern LNG), Post Office Box 2563... Regulatory, Southern LNG Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209 at...

  17. 76 FR 71961 - Elba Express Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Energy Regulatory Commission Elba Express Company, L.L.C.; Notice of Application Take notice that on October 31, 2011, Elba Express Company, L.L.C. (EEC), 569 Brookwood Village, Suite 501, Birmingham... Affairs, Elba Express Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209,...

  18. Risk Assessment of Communication Network of Power Company Based on Rough Set Theory and Multiclass SVM

    NASA Astrophysics Data System (ADS)

    He, Xi; Wang, Wei; Liu, Xinyu; Ji, Yong

    This paper proposes a new risk assessment method based on the attribute reduction theory of rough set and multiclass SVM classification. Rough set theory is introduced for data attribute reduction and multiclass SVM is used for automatic assessment of risk levels. Redundant features of data are deleted that can reduce the computation complexity of multiclass SVM and improve the learning and the generalization ability. Multiclass SVM trained with the empirical data can predict the risk level. Experiment shows that the predict result has relatively high precision, and the method is validity for power network risk assessment.

  19. Section 1: Company directory

    SciTech Connect

    Not Available

    1991-12-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope.

  20. Early utility experience with wind power generation. Volume 2. Pacific Gas and Electric Company, Solano County project. Final report

    SciTech Connect

    McCabe, T.; Henry, G.; Tennis, M.; Goldenblatt, M.

    1984-01-01

    This report is one of three presenting the results of EPRI Research Project 1590-1, Evaluation of Electric Utility Experience with Wind Power Generation. The objective of this project was to develop an improved understanding of wind power generation, in particular the process a utility must undergo to initiate and carry out a wind turbine project. The primary tasks of RP1590-1 were to document and evaluate the experience of two utilities with megawatt-scale wind turbine installations from project inception to the wind turbine's first rotation. This technical report presents the experiences of the Pacific Gas and Electric Company (PG and E) with its wind turbine installation at Solano County, California. All documents and reports pertaining to PG and E's experience with wind energy at Solano County were reviewed and excerpts made of the highlights. Gaps in the documentation were filled by talking with appropriate people. Site visits were conducted to monitor current activity. The information obtained was evaluated for its generic relevance and benefit to other utilities. The chronology of steps taken by PG and E in implementing the Solano wind turbine experience and some of the lessons learned are included in the report. In each section, important activities, critical assumptions, and interesting insights which might benefit other utility wind programs are identified.

  1. The Performance of Alabama College System Students on the Alabama Basic Skills Test. Chancellor's Research Report.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This study investigated the performance of Alabama College System (ACS) students on a Basic Skills Test (BST) and compared it with non-ACS students' scores to determine whether there were significant differences in achievement. The Alabama Basic Skills Test is required of all students seeking admission to teacher education programs at Alabama…

  2. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  3. State Teacher Policy Yearbook: Progress on Teacher Quality, 2007. Alabama State Summary

    ERIC Educational Resources Information Center

    National Council on Teacher Quality, 2007

    2007-01-01

    The "State Teacher Policy Yearbook" examines what is arguably the single most powerful authority over the teaching profession: state government. This Alabama edition of the National Council on Teacher Quality's (NCTQ's) "State Teacher Policy Yearbook" is the first of what will be an annual look at the status of state policies impacting the…

  4. Evaluation of the Alabama Reading Initiative, 1999-2000. Executive Summary.

    ERIC Educational Resources Information Center

    O'Neal, Marcia R.; Spor, Mary W.

    This paper is a summary of the evaluation of the second complete year of the implementation of the Alabama Reading Initiative (ARI), which is designed to achieve 100% literacy by targeting reading performance of beginning reading and first-grade students, to expand the reading power for second- through twelfth-grade students and to intervene for…

  5. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  6. UCA{trademark}/DAIS{trademark} demonstration project by Kansas City Power and Light Company. Final report

    SciTech Connect

    1997-12-01

    Kansas City Power and Light (KCPL) demonstrated the use of EPRI`s Utility Communication Architecture (UCA{trademark}) and Database Access Integrated Services (DAIS{trademark}) to provide KCPL employees seamless and transparent access to corporate data resources from their desktops. The major components of the KCPL project are client workstations with a Graphical User Interface which builds the necessary Structured Query Language (SQL) requests from the user`s data directory selections and provides a Dynamic Data Exchange (DDE) interface and programmer Application Program Interface (API). DAIS Directory Services provided data browsing and search capability and allows users to select data items for analysis. DAIS Servers provided database-related functions to both relational databases (customer data in Oracle) and non-relational data sources (PMAX performance monitoring system and PI historical database). The DAIS client software was provided by Automation Technology, Inc. (ATI); and the DAIS directory services software was provided by UNISYS. The Oracle DAIS server was provided by ATI, the PMAX non-relational DAIS server was developed by Black and Veatch, and the PI DAIS server was developed by ATI. The project was deemed a success as the corporate data was made available at the employee`s desktop for search and analysis, with the look and feel of a relational database, regardless of the source of the data.

  7. Influence of Host Community on Industrial Relations Practices and Policies: A Survey of Agbara Community and Power Holding Company of Nigeria (PHCN)

    ERIC Educational Resources Information Center

    Chidi, Christopher O.; Shadare, Oluseyi A.

    2011-01-01

    This study investigated the influence of host community on industrial relations practices and policies using Agbara community and Power Holding Company of Nigeria PLC as a case. The study adopted both the qualitative and quantitative methods. A total of 120 samples were drawn from the population using the simple random sampling technique in which…

  8. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... the Federal Register on August 31, 2011 (76 FR 54261). No comments or hearing requests were received... Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is the owner of the H.B... and materials license authorize CP&L to possess, use, and operate the Robinson facility. II....

  9. 2. ALABAMA GATES LOOKING SOUTHEAST ALONG LINED CHANNEL, NOTE CHEMICAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. ALABAMA GATES LOOKING SOUTHEAST ALONG LINED CHANNEL, NOTE CHEMICAL PURIFICATION TANK IN DISTANCE FOR KEEPING DOWN GROWTH OF ALGAE - Los Angeles Aqueduct, Alabama Gates, Los Angeles, Los Angeles County, CA

  10. 26. STARBOARD PROFILE OF ALABAMA (ALABAMIAN) WITH SAILS SET Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. STARBOARD PROFILE OF ALABAMA (ALABAMIAN) WITH SAILS SET Original 2-3/4'x2-1/4' photograph taken c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  11. Monitoring the Blind Shaft Borer Project, Oak Grove, Alabama

    SciTech Connect

    Amstutz, R.; Danowski, T.

    1982-03-01

    In 1974, plans of the United States to obtain energy self-sufficiency included a significant increase in coal production, primarily from new underground mines in the Eastern states. The poor condition of coal shaft sinking companies was a major concern. The US Bureau of Mines perceived similarities between shaft sinking and tunnel boring and felt that a machine could be produced for faster, safer shaft sinking. In January 1975, the Robbins Co., a major producer of tunnel boring machines, submitted an unsolicited proposal to the Bureau of Mines to develop, design, build and demonstrate a Blind Shaft Borer (BSB). In June 1975, a contract was initiated to start work on a BSB. After the Department of Energy was formed, the project was transferred to their Department of Fossil Fuel. In late 1978, while the BSB was being assembled for the field trial near Oak Grove, Alabama, the DOE contracted with Williams Brothers Engineering Company to monitor the site activities and provide technical advice to the Technical Project Manager. This report reviews the BSB project prior to the field trial, describes field trial operations as observed by Williams Brothers Engineering Company personnel and provides a summary of daily activities. It also details project problems, interim efforts to resolve them, results obtained and recommendations to preclude their re-occurrence on future BSB projects.

  12. Performance evaluation of Magma Power Company's reinjection well No. 46-7 at the East Mesa KGRA, California

    SciTech Connect

    Jorda, R.M.

    1980-02-01

    The performance of the Magma Power Company's reinjection well No. 46-7 at East Mesa has been examined. Water was cooled to 100/sup 0/F(+-) to simulate total heat extraction and then tested using membrane filter flow procedures. The cooled water contains particles which are in the high colloid size range, and formation impairment by these particles is unlikely. There is evidence that acid soluble corrosion products and calcium compounds constitute about two thirds of the particulates, and that the acid insoluble residue contains precipitated silica, insoluble corrosion products, and possibly formation fines carried in the produced water. Under stabilized conditions, the suspended solids content of the water is less than 2 parts per million. However, during the frequent production well start ups, a higher concentration of suspended solids is carried in the produced water and into the injection well, conceivably augmenting fill in the injector. But most likely, fill occurs when the injection well surges during shut-downs, because of inadequate sand control in the well completion. At the time of the test, the injection well was found to be severely impaired. Back flowing the well restored the injectivity to a calculated maximum sub-frac injection capacity of about 60,000 b/d of water at T = 350/sup 0/F, which corresponds to a calculated maximum hypofrac injection capacity of about 20,000 b/d of cold water (T = 100/sup 0/F).

  13. Preliminary survey report: evaluation of brake drum service controls at Indianapolis Power and Light Company, Indianapolis, Indiana

    SciTech Connect

    Godbey, F.W.

    1988-08-01

    An evaluation was made of various control technologies designed to reduce asbestos exposures during brake drum servicing at Indianapolis Power and Light Company, Indianapolis, Indiana. The garage at this facility serviced about 425 vehicles each year with about 200 brake repair jobs being done annually. During servicing, a regular wet and dry vacuum cleaner was used, along with a steam jenny containing liquid soap, and a liquid spray can. Once the wheel was removed, the entire hub area was sprayed with steam foam at 90 pounds per square inch from the steam jenny containing liquid soap. The hub area was vacuumed prior to and following removal. The vacuum cleaner was not equipped with an HEPA filter. A liquid spray can was used to clean the plates. The brake shoe area was vacuumed. Once the brake area was free of all accumulated dust, the brakes were serviced. The author concludes that control measures did not appear to be sufficient to keep asbestos dust from emanating into the atmosphere. The facility was not selected for an in-depth evaluation.

  14. Alabama's Education Report Card, 2011-2012

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2013

    2013-01-01

    Educational progress has been moving in the right direction for several years in Alabama. Now, with the implementation of Alabama's own Plan 2020, an even higher level of accountability for students, teachers, administrators, support systems, and schools/school systems, Alabama is poised to experience unprecedented growth. Add to that, the…

  15. The "Nuevo" New South: Hispanic Immigration to Alabama.

    ERIC Educational Resources Information Center

    Mohl, Raymond A.

    2002-01-01

    Describes Hispanic migration trends in Alabama, discussing how Alabama's demographic and cultural transformation and recent changes in the global economy are connected. The new Hispanic labor force has become an essential ingredient in Alabama's rural and urban economies. However, anti-immigrant sentiments have surfaced in some areas. Adjustment…

  16. 40 CFR 282.50 - Alabama State-Administered Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... administered by the Alabama Department of Environmental Management, was approved by EPA pursuant to 42 U.S.C... RCRA, 42 U.S.C. 6991c, and 40 CFR part 281, subpart E. If Alabama obtains approval for the revised... obtained from the Ground Water Branch, Alabama Department of Environmental Management, 1751 W.L....

  17. Graptemys pulchra Baur 1893: Alabama Map Turtle

    USGS Publications Warehouse

    Lovich, Jeffrey E.; Godwin, James C.; McCoy, C.J.

    2014-01-01

    The Alabama Map Turtle, Graptemys pulchra (Family Emydidae), is a moderately large riverine species endemic to the Mobile Bay drainage system of Alabama, Georgia, and Mississippi. Sexual size dimorphism is pronounced, with adult females (carapace length [CL] to 273 mm) attaining more than twice the size of adult males (CL to 117 mm). The species is an inhabitant of relatively large, swift creeks and rivers, often with wide sandbars. Stream sections open to the sun and with abundant basking sites in the form of logs and brush are preferred. Six to seven clutches of 4–7 eggs are laid each year on river sandbars. Although the species is locally abundant, populations are threatened by habitat destruction, declines in their prey base, commercial collection, and vandalism. It is listed as a Species of Special Concern in Alabama.

  18. Magnitude and frequency of floods in Alabama

    USGS Publications Warehouse

    Atkins, J. Brian

    1996-01-01

    Methods of estimating flood magnitudes for recurrence intervals of 2, 5, 10, 25, 50, 100, 200, and 500 years are described for rural streams in Alabama that are not affected by regulation or urbanization. Flood-frequency characteristics are presented for 198 gaging stations in Alabama having 10 or more years of record through September 1991, that are used in the regional analysis. Regression relations were developed using generalized least-squares regression techniques to estimate flood magnitude and frequency on ungaged streams as a function of the drainage area of a basin. Sites on gaged streams should be weighted with gaging station data that are presented in the report. Graphical relations of peak discharges to drainage areas are also presented for sites along the Alabama, Black Warrior, Cahaba, Choctawhatchee, Conecub, and Tombigbee Rivers. Equations for estimating flood magnitudes on ungaged urban streams (taken from a previous report) that use drainage area and percentage of impervious cover as independent variables also are given.

  19. 77 FR 28864 - Elba Express Company, L.L.C.; Notice of Amendment to Petition To Amend Order Issuing Certificate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Energy Regulatory Commission Elba Express Company, L.L.C.; Notice of Amendment to Petition To Amend Order Issuing Certificate Take notice that on May 3, 2012, Elba Express Company, L.L.C. (Elba Express), located..., Elba Express Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, by...

  20. 40 CFR 81.401 - Alabama.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Alabama. 81.401 Section 81.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF... manager Sipsey Wild 12,646 93-622 USDA-FS...

  1. 40 CFR 81.401 - Alabama.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Alabama. 81.401 Section 81.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF... manager Sipsey Wild 12,646 93-622 USDA-FS...

  2. 40 CFR 81.401 - Alabama.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Alabama. 81.401 Section 81.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF... manager Sipsey Wild 12,646 93-622 USDA-FS...

  3. 40 CFR 81.401 - Alabama.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Alabama. 81.401 Section 81.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF... manager Sipsey Wild 12,646 93-622 USDA-FS...

  4. Exploratory Programs in Alabama Middle Grades Schools.

    ERIC Educational Resources Information Center

    Warren, Louis L.; Allen, Michael G.; McKenna, Beverly

    Many educators believe that middle grades schools have a responsibility to capitalize on the natural curiosity of young adolescents through the use of an exploratory curriculum to help students understand the world in which they live. This study examined the status of middle grades exploratory programs in Alabama. A 22-item questionnaire was sent…

  5. Alabama Public Library Service Annual Report.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    The Alabama Public Library Service (APLS) lists its duties, goals, and recent accomplishments in this 1988 annual report. Some of these duties and goals are: (1) administering grants for library development and state aid; (2) providing consultation for library automation; (3) researching and answering reference questions; (4) lending books from…

  6. Alabama Public Library Service, 1987 Annual Report.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    Designed to provide an overview of the range and quality of services provided by the Alabama Public Library Service (APLS), this annual report focuses on the 1987 activities of APLS. A report on the activities of the Library Development Division shows the allocation of state aid and Library Services and Construction Act (LCSA) Titles I and III…

  7. The University of Alabama's Integrated Science Program.

    ERIC Educational Resources Information Center

    Rainey, Larry; Mitrook, Kim

    This program, supported by the Center for Communication and Educational Technology at the University of Alabama, incorporates the perspectives of biology, earth/space science, chemistry, and physics into an innovative science curriculum for the middle grades. Students are engaged for 20 minutes 3 times a week by an on-air instructor who is doing…

  8. 40 CFR 81.301 - Alabama.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Birmingham area is a maintenance area for the 1-hour NAAQS for purposes of 40 CFR part 51 subpart X. Alabama... affecting § 81.301 see the List of CFR Sections Affected which appears in the Finding Aids section of the... County Blount County Bullock County Butler County Calhoun County Chambers County Cherokee County...

  9. Financial Reporting for Alabama Public Universities.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    Guidelines for preparing year-end financial reports are provided for Alabama public university staff to insure that reporting formats produce comparable financial reports and to keep up with recent developments in college accounting and financial reporting. The public institutions comply with two publications issued by the American Institute of…

  10. RCP Local School Projects in Alabama.

    ERIC Educational Resources Information Center

    Regional Curriculum Project, Atlanta, GA.

    One of 6 state reports generated by the Regional Curriculum Project (funded under the Elementary and Secondary Education Act), the document describes 4 specific projects implemented through the Alabama State Superintendent's Office beginning in 1966. All 4 projects were designed to improve instructional leadership by defining the role(s) of the…

  11. State Education Finance and Governance Profile: Alabama

    ERIC Educational Resources Information Center

    Key, Logan

    2010-01-01

    This article presents the state education finance and governance profile of Alabama. The state is home to 1,538 public schools distributed across 67 county school systems and 64 city school systems. State spending is allocated via two separate budgets, "the general fund" for all noneducation related expenditures and the Education Trust Fund (ETF)…

  12. Alabama Kids Count 2001 Data Book.

    ERIC Educational Resources Information Center

    Curtis, Apreill; Bogie, Don

    This Kids Count data book examines statewide trends in well-being for Alabama's children. The statistical portrait is based on 17 indicators in the areas of health, education, safety, and security. The indicators are: (1) infant mortality rate; (2) low weight births; (3) child health index; (4) births to unmarried teens; (5) first grade retention;…

  13. Alabama Citizens on Postsecondary Education: Survey '76.

    ERIC Educational Resources Information Center

    Owings, Thomas G.

    During the summer of 1976, the Institute conducted a public opinion poll. From a random sample of 1,251 individuals, age 16 and over, 680 persons responded to and returned a 44-item questionnaire about various aspects of postsecondary education in Alabama. The survey results are analyzed from four perspectives: (1) previous national and regional…

  14. 76 FR 9642 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Alabama program in the May 20, 1982, Federal Register (47 FR 22030). You can also find later actions... the proposed amendment in the September 30, 2010, Federal Register (75 FR 60371). In the same document... protect society and the environment from the adverse effects of surface coal mining operations.''...

  15. 78 FR 11577 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Alabama program in the May 20, 1982, Federal Register (47 FR 22030). You can also find later actions... initiative. We announced receipt of the proposed amendment in the September 5, 2012, Federal Register (77 FR... protect society and the environment from the adverse effects of surface coal mining operations.''...

  16. New technology N products in alabama

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Because of high fertilizer N prices, growers are interested in using less expensive sources of N and using fertilizer additives to reduce ammonia volatilization losses from urea sources. An experiment on a Lucedale fine sandy loam in Central Alabama (Prattville Research Unit) was conducted in 2007 ...

  17. 75 FR 26814 - Alabama Disaster #AL-00031

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00031 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for Public Assistance Only for...

  18. 76 FR 29810 - Alabama Disaster #AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for Public Assistance Only for...

  19. 75 FR 474 - Alabama Disaster #AL-00026

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00026 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for Public Assistance Only for...

  20. 77 FR 60003 - Alabama Disaster #AL-00044

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster AL-00044 AGENCY: U.S. Small Business Administration. ACTION: Notice. SUMMARY: This is a Notice of the Presidential declaration of a major disaster for Public Assistance Only for...

  1. Chemical Technician Manpower Survey: State of Alabama.

    ERIC Educational Resources Information Center

    Watkins, Donald; And Others

    The study was undertaken to assess the needs of Alabama's industry for chemical technicians and to determine the kinds and levels of skills required by major employers. Of the 75 organizations responding to the questionnaire with usable data, 62 were private industries, 6 were testing laboratories, and 7 were federal agencies. Generally, the study…

  2. Implementation of Alabama Resources Information System, ARIS

    NASA Technical Reports Server (NTRS)

    Herring, B. E.

    1978-01-01

    Development of ARIS - Alabama Resources Information System is summarized. Development of data bases, system simplification for user access, and making information available to personnel having a need to use ARIS or in the process of developing ARIS type systems are discussed.

  3. 75 FR 60371 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... Register (47 FR 22030). You can also find later actions concerning the Alabama program and program... hearing until 4 p.m., c.d.t. on October 15, 2010. ADDRESSES: You may submit comments, identified by SATS No. AL-075-FOR by any of the following methods: E-mail: swilson@osmre.gov . Include ``SATS No....

  4. 76 FR 9700 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Alabama program in the May 20, 1982, Federal Register (47 FR 22030). You can also find later actions.... on March 9, 2011. ADDRESSES: You may submit comments, identified by SATS No. AL-076-FOR by any of the following methods: E-mail: swilson@osmre.gov . Include ``SATS No. AL-076-FOR'' in the subject line of...

  5. Subgroup Achievement and Gap Trends: Alabama

    ERIC Educational Resources Information Center

    Center on Education Policy, 2010

    2010-01-01

    In grade 8 (the only grade in which subgroup trends were analyzed by achievement level), Alabama students showed gains across the board in reading and math--at the basic, proficient, and advanced levels for all racial/ethnic subgroups, low income students, and boys and girls. Progress was made in narrowing achievement gaps between racial/ethnic…

  6. Oak Mountain High School, Shelby County, Alabama.

    ERIC Educational Resources Information Center

    Design Cost Data, 2001

    2001-01-01

    Presents design features of the Oak Mountain High School (Alabama) consisting of an academic side of classrooms, administration, and media center; and an activity side consisting of cafeteria, gymnasium, practice gym, and a theater. The school's floor plan and photos are included. (GR)

  7. Alabama Kids Count 2002 Data Book.

    ERIC Educational Resources Information Center

    Curtis, Apreill; Bogie, Don

    This Kids Count data book examines statewide trends in well-being of Alabamas children. The statistical portrait is based on 18 indicators in the areas of child health, education, safety, and security: (1) infant mortality rate; (2) low weight births; (3) child health index; (4) births to unmarried teens; (5) first grade retention; (6) school…

  8. Significance of selected lineaments in Alabama

    NASA Technical Reports Server (NTRS)

    Drahovzal, J. A.; Neathery, T. L.; Wielchowsky, C. C.

    1974-01-01

    Four lineaments in the Alabama Appalachians that appear on ERTS-1 imagery have been geologically analysed. Two of the lineaments appear to have regional geologic significance, showing relationships to structural and stratigraphic frameworks, water and mineral resources, geophysical anomalies, and seismicity. The other two lineaments are of local geologic significance, but, nevertheless, have important environmental implications.

  9. The Alabama School of Fine Arts.

    ERIC Educational Resources Information Center

    Gifted Child Quarterly, 1979

    1979-01-01

    The article describes the Alabama School of Fine Arts, a public secondary school offering, in addition to basic academics, intensive training in the areas of music, dance, drama, creative writing, and visual arts to talented and motivated junior and senior high school students in Birmingham. (Author/DLS)

  10. New technology N products in alabama

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Because of high fertilizer N prices, growers are interested in using less expensive sources of N and using fertilizer additives to reduce ammonia volatilization losses from urea sources. An experiment on a Lucedale fine sandy loam in Central Alabama (Prattville Research Unit) was conducted in 2007 t...

  11. 76 FR 14970 - National Starch and Chemical Company, Salisbury, Rowan County, NC; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... AGENCY National Starch and Chemical Company, Salisbury, Rowan County, NC; Notice of Settlement AGENCY... National Starch and Chemical Company Site located in Mobile, Mobile County, Alabama for publication. DATES..., identified by Docket ID No. EPA-RO4- SFUND-2011-0278 or Site name National Starch and Chemical...

  12. 77 FR 24483 - Southern Natural Gas Company, L.L.C.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Federal Energy Regulatory Commission Southern Natural Gas Company, L.L.C.; Notice of Filing Take notice that on April 5, 2012, Southern Natural Gas Company, L.L.C. (Southern), 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, filed an application, pursuant to Section 7(b) of the Natural Gas...

  13. Health-hazard evaluation report HETA 91-213-2123, G. T. Jones Tire and Battery Distributing Inc. , Birmingham, Alabama

    SciTech Connect

    Gittleman, J.; Estacio, P.; O'Brien, D.; Montopoli, M.

    1991-06-01

    In response to a request for technical assistance from the Alabama Health Department, possible hazardous working conditions at the G.T. Jones Tire and Battery Distributing Company (SIC-5093), Birmingham, Alabama were evaluated. The company employed 15 persons in battery breaking and recycling. Twelve of the workers had blood lead (7439921) levels over 60 micrograms/deciliter (microg/dl) and the average of the last three blood levels exceeded 50microg/dl for 13 of the employees. Blood lead levels greater than 60 were associated with biochemical evidence of impaired heme synthesis and impaired renal function. Fourteen workers had elevated zinc protoporphyrin (ZPP) levels over 100microg/dl consistent with moderate lead poisoning. Three had ZPPs over 600 microg/dl, consistent with severe lead poisoning. The authors conclude that a health hazard existed from overexposure to lead. The authors recommend measures to reduce exposures.

  14. Unleash the Power! Knowledge - Technology - Diversity: Papers Presented at the Third International Forum on Research in School Librarianship, Annual Conference of the International Association of School Librarianship (IASL) (28th, Birmingham, Alabama, November 10-14, 1999).

    ERIC Educational Resources Information Center

    Lighthall, Lynne, Ed.; Howe, Eleanor, Ed.

    Papers presented at this forum were grouped under the following four broad themes: "Unleash the Power!,""Powerful Roles,""Powerful Partnerships," and "Powerful Technologies." Also included is the paper that won the Takeshi Murofushi Research Award, "Implementing Flexible Scheduling in Elementary Libraries" (Joy H. McGregor). Titles and authors of…

  15. Water use, availability, and net demand in the Tennessee River watershed within Alabama, 2005

    USGS Publications Warehouse

    Gill, Amy C.; Harper, Michael J.; Littlepage, Thomas M.

    2013-01-01

    The U.S. Geological Survey worked in cooperation with the Alabama Department of Economic and Community Affairs—Office of Water Resources to estimate water use and water availability for 2005 for the portion of the Tennessee River watershed contained within the borders of the State of Alabama. Estimates of water use and availability are an important part of planning for population and economic growth in the Tennessee River watershed in Alabama. Total water use for the region in 2005 was 5,197 million gallons per day (Mgal/d). Total surface-water withdrawals were 5,139 Mgal/d, and total groundwater withdrawals were about 58 Mgal/d. About 92 percent of the total water withdrawn was surface water used for once-through cooling for thermoelectric power generation. Self-supplied industrial and public-supply water uses accounted for the next greatest uses of water, constituting approximately 49 and 42 percent, respectively, of the total water use excluding thermoelectric power use. Summaries of water use by county and subbasin indicated the areas of greatest water withdrawals and use within the Tennessee River watershed. Limestone (2,012 Mgal/d), Jackson (1,498 Mgal/d), and Colbert (1,363 Mgal/d) Counties were the counties with the greatest total water use in 2005 and had large amounts of water withdrawn for thermoelectric power generation. When water use from thermoelectric power generation was not considered, the counties with the greatest withdrawals were Morgan (124 Mgal/d), Madison (72 Mgal/d), Colbert (69 Mgal/d), and Lawrence (67 Mgal/d). The subbasin with the greatest total water use was Wheeler Lake (2,260 Mgal/d) in the Middle Tennessee—Elk subregion. Wheeler Lake subbasin also had the greatest public-supply, irrigation, industrial, mining, and thermoelectric withdrawals of any subbasin in the Tennessee River watershed within Alabama. Total water availability for the Tennessee River watershed within Alabama was estimated to be 34,567 Mgal/d by the Geological

  16. U.S. hydropower resource assessment for Alabama

    SciTech Connect

    Conner, A.M.; Francfort, J.E.

    1998-02-01

    The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Alabama.

  17. 78 FR 14361 - In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units 1 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... change of control of EFH, EFCH, or Luminant as a result of this internal restructuring. No physical... January 2, 2013 (78 FR 119), and a correction notice was published on January 10, 2013 (78 FR 2295). No... Proposed Internal Restructuring and Indirect Transfer of License I Luminant Generation Company...

  18. COMPUTATION OF UNSTEADY FLOWS IN THE ALABAMA RIVER.

    USGS Publications Warehouse

    Jeffcoat, Hillary H.; Jennings, Marshall E.

    1987-01-01

    An application is described of the branch-network flow model, BRANCH, to the upper Alabama River system in central Alabama. The model is used to simulate one-dimensional unsteady flows and water surface elevations in approximately 60 river miles of the Alabama River system. Preliminary calibration was made using 72 hours of observed data. Simulated discharges are about 10 percent lower than observed discharges at higher discharge rates and computer flows lag observed flows by about 30 minutes.

  19. Development of Alabama Resources Information System (ARIS)

    NASA Technical Reports Server (NTRS)

    Herring, B. E.; Vachon, R. I.

    1976-01-01

    A formal, organized set of information concerning the development status of the Alabama Resources Information System (ARIS) as of September 1976 is provided. A series of computer source language programs, and flow charts related to each of the computer programs to provide greater ease in performing future change are presented. Listings of the variable names, and their meanings, used in the various source code programs, and copies of the various user manuals which were prepared through this time are given.

  20. Ground Breaking Ceremony for the Alabama Space Center

    NASA Technical Reports Server (NTRS)

    1968-01-01

    Ground breaking ceremony for the Alabama Space Science Center, later renamed the U.S. Space and Rocket Center. Shown in this picture, left to right, are Edward O. Buckbee, Space Center Director; Jack Giles, Alabama State Senator of Huntsville; Dr. Wernher on Braun, Marshall Space Flight Center (MSFC) Director; Martin Darity, head of the Alabama Publicity Bureau (representing Governor Albert Brewer); James Allen, former Lieutenant governor, chairman of the Alabama Space Science Exhibit Commission; Major General Charles Eifler, commanding general of the Army Ordnance Missile Command; and Huntsville Mayor Glenrn Hearn. (Courtesy of Huntsville/Madison County Public Library)

  1. Hydrologic characterization of the unconfined aquifer at the University of Alabama Student Recreation Center, Tuscaloosa, Alabama

    SciTech Connect

    Hall, S.H.; Newcomer, D.R.

    1992-02-01

    Seasonal thermal energy storage (STES) involves storing thermal energy such as winter chill, summer heat, and industrial waste heat for future use in heat and/or cooling buildings or for industrial processes. Widespread development and implementation of STES would significantly reduce the need to generate primary energy in the United States. Recent data indicate that STES is technically suitable for providing 5% to 10% of the nation's energy, with major contributions in the commercial and industrial sectors and in district heating and cooling applications. This report describes aquifer characterization at the University of Alabama Student Recreation Center in Tuscaloosa, Alabama. The purpose of the testing is to provide design data for the University's use in modifying and expanding an existing ATES well field. The aquifer characterization work was conducted by the Pacific Northwest Laboratory (Seasonal Thermal Energy Storage Program) in cooperation with the University of Alabama as part of efforts to assess the use of chill ATES for space cooling.

  2. Uncovering and evaluation of a twenty-five-year-old underground-coal-gasification burn at a site in Gorgas, Alabama

    SciTech Connect

    Capp, J.P.

    1981-04-01

    During the late forties and into the fifties, the US Bureau of Mines (USBM) and the Alabama Power Company conducted a series of underground coal gasification burns in the Pratt and America coal beds at Gorgas, Alabama. Following the first burn, by the so called stream method, it was feasible to enter the burned out areas by deep mining and assess what had taken place during the operation of the test site. In the latter tests, however, it was not economically feasible to explore the burned out areas except by means of core drilling. Now, in early 1981, surface mining is being done in the vicinity of the first hydraulic fracture area. I had been there during the active operation of the burns and agreed to go to Gorgas, evaluate the exposed area, collect samples, take photographs, and provide this written report. I spent several days taking photographs and making observations at the exposed burn site, taking samples, and discussing the best ways to coordinate future exposures with the coal mining process. The uncovered burn area at the site of the first hydraulic fracture can be described as a flat, roughly circular shaped area, varying in thickness from about 1 foot to 2 feet high and covered with a mixture of the various materials removed in the mining operation, i.e., broken bits of coal, rock, clay, etc. However it rained the night before the observation and during the entire evaluation period making it extremely difficult to determine whether fine gray colored materials were clay or residual ash.

  3. Health hazard evaluation report No. HHE-80-233-793, Davis Bessie Nuclear Power Station, Toledo Edison Company, United Engineers and Contractors Company (UE and C), Oak Harbor, Ohio

    SciTech Connect

    Cone, J.; Hartle, R.

    1981-01-01

    Personal air samples were analyzed and employees were given medical evaluations at Davis Bessie Nuclear Power Station (SIC-4911) in Oak Harbor, Ohio. Requests for evaluation were made by a union representative of the United Engineers and Contractors and a union representative of employees of Toledo Edison Company, working on site at the power station, to evaluate employee skin and scalp problems due to exposure to ceramic wood fibers. Preliminary surveys were conducted on September 24 and 25, 1980 and a follow-up survey was performed on October 16, 1980. Environmental evaluation consisted of gravimetric analyses of personal air samples for airborne ceramic wool fibers. A total of 400 production and maintenance workers and varying numbers of construction workers were exposed to the fibers during installation of insulation which was completed at the time of the survey. The three personal air samples showed no accumulation of particulates and fibers detected were nonrespirable. Medical evaluations were conducted in 52 workers and scalp scrapings were obtained from 43 workers. Thirty seven workers had histories suggestive of irritant dermatitis of the scalp; 24 workers had physical findings consistent with the diagnosis. Of the 43 scalp samples, 18 were contaminated with organisms of the gut, perineum, skin or respiratory tract. Dermatitis was directly related to the history of dust exposure. The authors conclude that a potential health hazard exists for employees from exposure to ceramic wool fiber. Recommendations include provision of handwashing facilities and protective clothing for employees, and installation of an impermeable covering for the ceramic wool fiber.

  4. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  5. 77 FR 41132 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... studies to evaluate specific atmospheric chemistry in an area. See PM 2.5 Implementation Rule, 72 FR 20596... portion of the Chattanooga Area on February 8, 2012 (77 FR 6469). EPA has determined that Alabama's PM 2.5... for EPA's proposed action? A. Designation History On July 18, 1997 (62 FR 38652), EPA established...

  6. CHARACTERISTICS OF THE STUDENT POPULATION, UNIVERSITY OF ALABAMA RESIDENT CENTER, HUNTSVILLE, ALABAMA.

    ERIC Educational Resources Information Center

    FRANKLIN, ELTON

    THE MAIN PURPOSE OF THIS 1959 SURVEY WAS TO ANALYZE SOME OF THE BASIC CHARACTERISTICS OF STUDENTS AT THE UNIVERSITY OF ALABAMA RESIDENT CENTER, HUNTSVILLE. FINDINGS WERE TABULATED IN SUMMARY FORM AND BY MAJOR FIELDS OF ACADEMIC INTEREST. OF THE STUDENTS (LARGELY YOUNG ADULTS), 51 PERCENT WERE IN ENGINEERING. ONLY 16 PERCENT WERE FEMALE. MOST…

  7. Alabama Bound: Identifying Factors Associated with Secondary Education Students' Choice of Attending The University of Alabama

    ERIC Educational Resources Information Center

    Acker, Jon Charles; Hughes, William W.; Fendley, William R., Jr.

    2004-01-01

    Alabama's primary competitor in recruiting is in-state rival Auburn University which lures away roughly one in eight of UA's admitted students. Two factors stand above all others in attracting students to UA--academic reputation and social activities reputation. Factors following distantly are a visit to the UA campus, financial assistance and the…

  8. AL State Profile. Alabama: Alabama High School Graduation Exam (AHSGE), 3rd Edition

    ERIC Educational Resources Information Center

    Center on Education Policy, 2010

    2010-01-01

    This paper provides information about Alabama High School Graduation Exam, 3rd Edition, a comprehensive standards-based exam. The purpose of the exam is to: (1) Provide schools with student academic diagnostic information; (2) Determine prospective high school graduates' mastery of the state curriculum; (3) Increase alignment of local curriculum…

  9. 14. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Southern RR at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Southern RR at Epes Alabama Great Southern RR bridge. View from S. Copy of photo taken in 1922 by Jack Donnell, Columbus, Ms. Sarcone Photography, Columbus, Ms., Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  10. A Study of School Size among Alabama's Public High Schools

    ERIC Educational Resources Information Center

    Lindahl, Ronald A.; Cain, Patrick M., Sr.

    2012-01-01

    The purpose of this study was to examine the relationship between the size of Alabama's public high schools, selected school quality and financial indicators, and their students' performance on standardized exams. When the socioeconomic level of the student bodies is held constant, the size of high schools in Alabama has relatively little…

  11. Alabama Commission on Higher Education. Occasional Papers on Higher Education.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    Two papers on the funding formula of the Alabama Commission for Higher Education are presented. The first paper, by John F. Porter, Jr., "The Origins and Evolutions of the Funding Formula Model Utilized by the Alabama Commission on Higher Education, 1973-82," presents the historical antecedents for the existing formula elements and notes…

  12. Alabama's Education Report Card 2010-11

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2012

    2012-01-01

    Public education in Alabama is moving in the right direction and is poised to be a national model for the college and career readiness of its students. Through some of the most challenging financial circumstances, public education in Alabama has continued to show great promise in many areas, including reading, math, and science. The success of…

  13. Management Audit of Selected Alabama Local School Systems.

    ERIC Educational Resources Information Center

    Griffenhagen-Kroeger, Inc., San Francisco, CA.

    This combined management audit and personnel staffing survey of a sample of Alabama schools reports recommendations for policy changes to the Alabama Education Study Commission. Policy changes in educational management are suggested with respect to school organization, state fund apportionment procedures, curriculum development, test scoring,…

  14. Alabama's Education Report Card, 2009-2010

    ERIC Educational Resources Information Center

    Alabama Department of Education, 2011

    2011-01-01

    In a more consistent and viable manner than ever before, education in Alabama is moving toward its ultimate goal of providing every student with a quality education, thereby preparing them for work, college, and life after high school. Alabama's graduation rates from 2002 to 2008 increased significantly, tripling the national average increase…

  15. The Rural Alabama Pregnancy and Infant Health (RAPIH) Program.

    ERIC Educational Resources Information Center

    Leeper, J. D.; And Others

    The impact of the Rural Alabama Pregnancy and Infant Health (RAPIH) Program was evaluated in relation to prenatal care, birth outcome measures, and several child health and home environment outcomes. Begun in 1983, RAPIH targets poor rural blacks in three of west-central Alabama's poorest counties, where economic conditions and infant mortality…

  16. Trends in Tobacco Use by Alabama Youth (1995-1999).

    ERIC Educational Resources Information Center

    Sun, Feng; Bruess, Clint

    To examine changes in tobacco use among high school students in Alabama from 1995 to 1999, Alabama Youth Risk Behavior Surveillance System (YRBS) survey data were analyzed. The survey has been used since 1990 to examine the health practices of adolescents and to monitor priority health-risk behaviors that contribute to the leading causes of…

  17. Alabama Linkage: An Innovative Higher Education Consortium Maximizing Statewide Resources.

    ERIC Educational Resources Information Center

    Joiner, Charles L.; And Others

    In the late 1960's and early 1970's, attracting physicians to areas of rural Alabama was virtually impossible because of the lack of professional health care workers available to become part of the necessary health care team. To address this problem, the University of Alabama (UA) adopted a plan to create a consortium of higher education…

  18. Aeromonas hydrophila in 2010: Characteristics of Alabama outbreaks

    Technology Transfer Automated Retrieval System (TEKTRAN)

    For a second year, epidemics associated with a virulent strain of Aeromonas hydrophila resulted in losses of hundreds of thousands of pounds of market size Alabama (AL) catfish. During this period, the Alabama Fish Farming Center diagnosed outbreaks of this strain of A. hydrophila on 25% (28/113) o...

  19. 24. STARBOARD PROFILE OF ALABAMA (ALABAMIAN); VESSEL AT ANCHOR ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. STARBOARD PROFILE OF ALABAMA (ALABAMIAN); VESSEL AT ANCHOR ON STATION IN GULF OF MEXICO WITH MOTOR BOAT TIED AT STERN Original 4-3/4'x6-3/4' photograph taken c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  20. 25. VIEW OF ALABAMA (ALABAMIAN) FROM OFF PORT BOW; VESSEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF ALABAMA (ALABAMIAN) FROM OFF PORT BOW; VESSEL AT ANCHOR ON STATION IN GULF OF MEXICO WITH MOTOR BOAT TIED AT STERN Original 4-3/4'x6-3/4' photograph taken c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  1. 23. VIEW FROM STARBOARD BOW OF ALABAMA AS 'ALABAMIAN.' Uncopyrighted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. VIEW FROM STARBOARD BOW OF ALABAMA AS 'ALABAMIAN.' Uncopyrighted 3-1/2'x5-5/8' postcard; image taken on station in Gulf of Mexico, c. 1930? - Pilot Schooner "Alabama", Moored in harbor at Vineyard Haven, Vineyard Haven, Dukes County, MA

  2. 76 FR 32982 - Alabama; Emergency and Related Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-07

    ... SECURITY Federal Emergency Management Agency Alabama; Emergency and Related Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: This is a notice of the Presidential declaration of an emergency for the State of Alabama (FEMA-3319-EM), dated April 27, 2011, and...

  3. Inservice Education at a Distance: A Rural Consortium in Alabama

    ERIC Educational Resources Information Center

    Addleton, Robert L.; Edmonds, Charles; Gamble, Lanny; Watkins, J. Foster

    1983-01-01

    The articles describes the efforts of seven rural systems in northeast Alabama to respond in a cooperative manner to new initiatives from the State Department of Education to improve their inservice/staff development programs. The University of Alabama, primarily through its Gadsden Center, provided professional support and coordinating…

  4. Workforce Illiteracy in Alabama: Report of the Survey Group.

    ERIC Educational Resources Information Center

    Horne, Herbert R., Jr.; And Others

    A survey group of the State Literacy Workforce Development Council studied the impact of illiteracy on Alabama's work force and economy using census data. Findings indicated that 55 percent of Alabama's adults functioned at literacy levels inadequate to meet the demands of a modern, technical society. Costs to business and industry were lost…

  5. Phorid Flies in Alabama: A tale of two species

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Two species of phorid fly have been released at 11 sites in Alabama and have been recovered from 9 sites. Pseudacteon tricuspis Borgmeier (Diptera: Phoridae) was released in South Alabama in populations of the red imported fire ant, Solenopsis invicta Buren (Hymenoptera: Formicidae), and Pseudacteon...

  6. Reservoir characterization of the Smackover Formation in southwest Alabama

    SciTech Connect

    Kopaska-Merkel, D.C.; Hall, D.R.; Mann, S.D.; Tew, B.H.

    1993-02-01

    The Upper Jurassic Smackover Formation is found in an arcuate belt in the subsurface from south Texas to panhandle Florida. The Smackover is the most prolific hydrocarbon-producing formation in Alabama and is an important hydrocarbon reservoir from Florida to Texas. In this report Smackover hydrocarbon reservoirs in southwest Alabama are described. Also, the nine enhanced- and improved-recovery projects that have been undertaken in the Smackover of Alabama are evaluated. The report concludes with recommendations about potential future enhanced- and improved-recovery projects in Smackover reservoirs in Alabama and an estimate of the potential volume of liquid hydrocarbons recoverable by enhanced- and improved-recovery methods from the Smackover of Alabama.

  7. Soil Sampling Techniques For Alabama Grain Fields

    NASA Technical Reports Server (NTRS)

    Thompson, A. N.; Shaw, J. N.; Mask, P. L.; Touchton, J. T.; Rickman, D.

    2003-01-01

    Characterizing the spatial variability of nutrients facilitates precision soil sampling. Questions exist regarding the best technique for directed soil sampling based on a priori knowledge of soil and crop patterns. The objective of this study was to evaluate zone delineation techniques for Alabama grain fields to determine which method best minimized the soil test variability. Site one (25.8 ha) and site three (20.0 ha) were located in the Tennessee Valley region, and site two (24.2 ha) was located in the Coastal Plain region of Alabama. Tennessee Valley soils ranged from well drained Rhodic and Typic Paleudults to somewhat poorly drained Aquic Paleudults and Fluventic Dystrudepts. Coastal Plain s o i l s ranged from coarse-loamy Rhodic Kandiudults to loamy Arenic Kandiudults. Soils were sampled by grid soil sampling methods (grid sizes of 0.40 ha and 1 ha) consisting of: 1) twenty composited cores collected randomly throughout each grid (grid-cell sampling) and, 2) six composited cores collected randomly from a -3x3 m area at the center of each grid (grid-point sampling). Zones were established from 1) an Order 1 Soil Survey, 2) corn (Zea mays L.) yield maps, and 3) airborne remote sensing images. All soil properties were moderately to strongly spatially dependent as per semivariogram analyses. Differences in grid-point and grid-cell soil test values suggested grid-point sampling does not accurately represent grid values. Zones created by soil survey, yield data, and remote sensing images displayed lower coefficient of variations (8CV) for soil test values than overall field values, suggesting these techniques group soil test variability. However, few differences were observed between the three zone delineation techniques. Results suggest directed sampling using zone delineation techniques outlined in this paper would result in more efficient soil sampling for these Alabama grain fields.

  8. Paleocene lignite deposits of southwest Alabama

    SciTech Connect

    Mancini, E.A.

    1984-04-01

    In southwest Alabama, lignite having economic potential occurs in the Oak Hill Member of the Naheola Formation. This middle Paleocene lignite generally consists of a single bed of 1-14 ft (0.5-4 m) in thickness and is the most extensive lignite in the southwest Alabama region. The Oak Hill lignite deposit accumulated in lower delta plain coastal marshes in interchannel areas behind a barrier system. The source area for the deltaic sediments was probably to the west and/or northwest of Choctaw County, Alabama. The lignite occurs in a clay-dominated sequence. Oak Hill interdistributary bay ripple-laminated clays are interbedded with ripple-laminated, crevasse splay sands generally less than 15 ft (5 m) thick. The glauconitic sands of the overlying Coal Bluff Marl Member of the Naheola Formation represent times of marine encroachment into the interchannel basin area. Lignite having subeconomic value at present occurs in the upper part of the Tuscahoma Sand. This upper Paleocene lignite is irregular in its outcrop pattern and apparently is not represented over extensive areas. It is locally persistent with one or more beds less than 3 ft (1 m) thick. The Tuscahoma may contain up to 6 lignite seams that may exceed a total thickness of 5 ft (1.5 m). These lignite beds were deposited in lower delta-plain coastal marshes adjacent to high constructive deltaic bar finger sands. Tuscahoma marsh clays are interbedded with ripple-laminated and cross-bedded bar finger sands. The Tuscahoma Sand is overlain by the Bashi Marl Member of the Hatchetigbee Formation. The Bashi contains a diverse lower Eocene marine fossil assemblage.

  9. Paleocene lignite deposits of southwest Alabama

    SciTech Connect

    Mancini, E.A.

    1984-04-01

    In southwest Alabama, lignite having economic potential occurs in the Oak Hill Member of the Naheola Formation. This middle Paleocene lignite generally consists of a single bed of 1-14 ft (0.5-4 m) in thickness and is the most extensive lignite in the southwest Alabama region. The Oak Hill lignite deposit accumulated in lower delta plain coastal marshes in interchannel areas behind a barrier system. The source area for the deltaic sediments was probably to the west and/or northwest of Choctaw County, Alabama. The lignite occurs in a clay-dominated sequence. Oak Hill interdistributary bay ripple-laminated clays are interbedded with ripple-laminated, crevasse splay sands generally less than 15 ft (5 m) thick. The glauconitic sands of the overlying Coal Bluff Marl Member of the Naheola Formation represent times of marine encroachment into the interchannel basin area. Lignite haing subeconomic value at present occurs in the upper part of the Tuscahoma Sand. This upper Paleocene lignite is irregular in its outcrop pattern and apparently is not represented over extensive areas. It is locally persistent with one or more beds less than 3 ft (1 m) thick. The Tuscahoma may contain up to 6 lignite seams that may exceed a total thickness of 5 ft (1.5 m). These lignite beds were deposited in lower delta-plain coastal marshes adjacent to high constructive deltaic bar finger sands. Tuscahoma marsh clays are interbedded with ripple-laminated and cross-bedded bar finger sands. The Tuscahoma Sand is overlain by the Bashi Marl Member of the Hatchetigbee Formation. The Bashi contains a diverse lower Eocene marine fossil assemblage.

  10. 2012 Alabama Lunabotics Systems Engineering Paper

    NASA Technical Reports Server (NTRS)

    Baker, Justin; Ricks, Kenneth; Hull, Bethanne J.

    2012-01-01

    Excavation will hold a key role for future lunar missions. NASA has stated that "advances in lunar regolith mining have the potential to significantly contribute to our nation's space vision and NASA space exploration operations." [1]. The Lunabotics Mining Competition is an event hosted by NASA that is meant to encourage "the development of innovative lunar excavation concepts from universities which may result in clever ideas and solutions which could be applied to an actual lunar excavation device or payload." [2]. Teams entering the competition must "design and build a remote controlled or autonomous excavator, called a lunabot, that can collect and deposit a minimum of 10 kilograms of lunar simulant within 10 minutes." [2]. While excavation will play an important part in lunar missions, there will still be many other tasks that would benefit from robotic assistance. An excavator might not be as well suited for these tasks as other types of robots might be. For example a lightweight rover would do well with reconnaissance, and a mobile gripper arm would be fit for manipulation, while an excavator would be comparatively clumsy and slow in both cases. Even within the realm of excavation it would be beneficial to have different types of excavators for different tasks, as there are on Earth. The Alabama Lunabotics Team at the University of Alabama has made it their goal to not only design and build a robot that could compete in the Lunabotics Mining Competition, but would also be a multipurpose tool for future NASA missions. The 2010-2011 resulting robot was named the Modular Omnidirectional Lunar Excavator (MOLE). Using the Systems Engineering process and building off of two years of Lunabotics experience, the 20ll-2012 Alabama Lunabotics team (Team NASACAR) has improved the MOLE 1.0 design and optimized it for the 2012 Lunabotics Competition rules [I]. A CAD model of MOLE 2.0 can be seen below in Fig. 1.

  11. Migrant Children in Alabama. A Survey to Identify Children of Migrant Workers and Certain Former Migrant Workers in Alabama.

    ERIC Educational Resources Information Center

    Alabama Univ., Tuscaloosa. Coll. of Education.

    A 1-year study was completed in August of 1969 by the University of Alabama on procedures to identify the children of migrant workers and of former migrant workers in 6 school systems in Alabama (Blount, Cullman, Pike, and Washington County School Systems and Demopolis and Elba City School Systems). The report of this study (1) includes detailed…

  12. Alabama Education News. Volume 30, Number 1, August-September 2006

    ERIC Educational Resources Information Center

    White, Rebecca Leigh, Ed.

    2006-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama", as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  13. 75 FR 23264 - Public Water System Supervision Program Revision for the State of Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... AGENCY Public Water System Supervision Program Revision for the State of Alabama AGENCY: Environmental... of Alabama is revising its approved Public Water System Supervision Program. Alabama has adopted the..., EPA is tentatively approving this revision to the State of Alabama's Public Water System...

  14. 77 FR 38515 - Approval and Promulgation of Implementation Plans; State of Alabama; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ...EPA is finalizing a limited approval of a revision to the Alabama State Implementation Plan (SIP) submitted by the State of Alabama through the Alabama Department of Environmental Management (ADEM) on July 15, 2008. Alabama's July 15, 2008, SIP revision addresses regional haze for the first implementation period. Specifically, this SIP revision addresses the requirements of the Clean Air Act......

  15. 77 FR 124 - Biological Processors of Alabama; Decatur, Morgan County, AL; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... AGENCY Biological Processors of Alabama; Decatur, Morgan County, AL; Notice of Settlement AGENCY... Biological Processors of Alabama Superfund Site located in Decatur, Morgan County, Alabama. DATES: The Agency... name Biological Processors of Alabama Superfund Site by one of the following methods:...

  16. Alabama Education News. Volume 32, Number 1, August-September 2008

    ERIC Educational Resources Information Center

    Sibley, Michael O., Ed.

    2008-01-01

    "Alabama Education News" is published monthly except for June, July, and December by the Alabama Department of Education. This publication, authorized by Section 16-2-4 of the "Code of Alabama," as recompiled in 1975, is a public service of the Alabama Department of Education designed to inform citizens and educators about programs and goals of…

  17. 75 FR 43964 - Enterprise Alabama Intrastate, LLC; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... Energy Regulatory Commission Enterprise Alabama Intrastate, LLC; Notice of Compliance Filing July 20, 2010. Take notice that on July 19, 2010, Enterprise Alabama Intrastate, LLC (Enterprise Alabama) pursuant to a July 8, 2010, Letter Order which required Enterprise Alabama to file within 30 days of...

  18. 75 FR 27340 - Enterprise Alabama Intrastate, LLC; Notice of Petition for Rate Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Energy Regulatory Commission Enterprise Alabama Intrastate, LLC; Notice of Petition for Rate Approval May 6, 2010. Take notice that on May 3, 2010, Enterprise Alabama Intrastate, LLC (Enterprise Alabama.... Enterprise Alabama states it is filing to justify its current system-wide transportation rate of 47.93...

  19. 76 FR 48879 - Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Fish and Wildlife Service Draft Environmental Impact Statement for Alabama Beach Mouse General... endangered Alabama beach mouse (Peromyscus polionotus ammobates) in Baldwin County, Alabama. The GCP analyzes... availability of the proposed GCP and the dEIS. These documents analyze the take of the Alabama beach...

  20. 76 FR 59671 - Ocean Renewable Power Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    .... g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-828(c). h. Applicant Contact: Christopher R... facilities would include: (1) A single, approximately 98.5-foot-long, cross-flow Kinetic System turbine... 1; (2) four, approximately 98.5-foot-long, cross-flow Kinetic System TGUs mounted on bottom...

  1. 76 FR 52357 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Unit 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires participants to submit...\\ Requestors should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28, 2007... Power Ratio (SLMCPR) values. The SLMCPR is established to assure that at least 99.9% of the fuel rods...

  2. NREL and Sandia National Laboratories (SNL) Support of Ocean Renewable Power Company's TidGen™ Power System Technology Readiness Advancement Initiative Project

    SciTech Connect

    LiVecchi, Al

    2015-05-07

    This document summarizes the tasks identified for National Laboratory technical support of Ocean Renewable Power Corporation (ORPC) DOE grant awarded under the FY10 Industry Solicitation DE-FOA-0000293: Technology Readiness Advancement Initiative. The system ORPC will deploy in Cobscook Bay, ME is known as the TidGen™ Power System. The Turbine Generator Unit (TGU) each have a rated capacity of 150 to 175 kW, and they are mounted on bottom support frames and connected to an onshore substation using an underwater power and control cable. This system is designed for tidal energy applications in water depths from 60 to 150 feet. In funding provided separately by DOE, National Laboratory partners NREL and SNL will provide in-kind resources and technical expertise to help ensure that industry projects meet DOE WWPP (Wind and Water Power Program) objectives by reducing risk to these high value projects.

  3. Site environmental report for calendar year 2002. DOE operations at the Boeing Company, Rocketdyne Propulsion and Power

    SciTech Connect

    2003-09-30

    This Annual Site Environmental Report (ASER) for 2002 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing' s Santa Susana Field Laboratory (SSFL)). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988, and, subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2002 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property ( land, structures, waste), and recycling. All radioactive w astes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste disposal. No liquid radioactive wastes are released into the environment, and no structural debris from buildings w as transferred to municipal landfills or recycled in 2002.

  4. Geoscience research databases for coastal Alabama ecosystem management

    USGS Publications Warehouse

    Hummell, Richard L.

    1995-01-01

    Effective management of complex coastal ecosystems necessitates access to scientific knowledge that can be acquired through a multidisciplinary approach involving Federal and State scientists that take advantage of agency expertise and resources for the benefit of all participants working toward a set of common research and management goals. Cooperative geostatic investigations have led toward building databases of fundamental scientific knowledge that can be utilized to manage coastal Alabama's natural and future development. These databases have been used to assess the occurrence and economic potential of hard mineral resources in the Alabama EFZ, and to support oil spill contingency planning and environmental analysis for coastal Alabama.

  5. Alabama Institute for Deaf and Blind Biodiesel Project Green

    SciTech Connect

    Edmiston, Jessica L

    2012-09-28

    Through extensive collaboration, Alabama Institute for Deaf and Blind (AIDB) is Alabama's first educational entity to initiate a biodiesel public education, student training and production program, Project Green. With state and national replication potential, Project Green benefits local businesses and city infrastructures within a 120-mile radius; provides alternative education to Alabama school systems and to schools for the deaf and blind in Appalachian States; trains students with sensory and/or multiple disabilities in the acquisition and production of biodiesel; and educates the external public on alternative fuels benefits.

  6. Northern States Power Company (NSP) Black Dog generating plant - Unit 2 emission reduction, capacity increase and life extension through atmospheric fluidized bed combustion (AFBC) retrofit

    SciTech Connect

    Jenness, B.L.; Rosendahl, S.M.; Gamble, R.L.

    1985-08-01

    The authors report on progress to date of the atmospheric fluidized-bed combustion (AFBC) boiler retrofit at the Black Dog Unit 2 plant of the Northern States Power Company. Construction began in September 1984 after the completion of technical and economic feasibility studies, and initial operation is scheduled for the second quarter of 1986. The project features the largest AFBC boiler to date, a 40 MW capacity regain/upgrade, and 25-year extension of unit life, low leakage regenerative air preheater design, electrostatic precipitator performance improvement, alternate fuel co-firing capacity, and reduced emission on a per MW basis. The authors describe the management and engineering developments associated with the project. 12 figures, 4 tables.

  7. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    SciTech Connect

    Burke, T.M.; Lucoff, D.M.

    1997-03-18

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs.

  8. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    SciTech Connect

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  9. Hydrologic characterization of the unconfined aquifer at the University of Alabama Student Recreation Center, Tuscaloosa, Alabama

    SciTech Connect

    Hall, S.H.; Newcomer, D.R.

    1992-02-01

    Seasonal thermal energy storage (STES) involves storing thermal energy such as winter chill, summer heat, and industrial waste heat for future use in heat and/or cooling buildings or for industrial processes. Widespread development and implementation of STES would significantly reduce the need to generate primary energy in the United States. Recent data indicate that STES is technically suitable for providing 5% to 10% of the nation`s energy, with major contributions in the commercial and industrial sectors and in district heating and cooling applications. This report describes aquifer characterization at the University of Alabama Student Recreation Center in Tuscaloosa, Alabama. The purpose of the testing is to provide design data for the University`s use in modifying and expanding an existing ATES well field. The aquifer characterization work was conducted by the Pacific Northwest Laboratory (Seasonal Thermal Energy Storage Program) in cooperation with the University of Alabama as part of efforts to assess the use of chill ATES for space cooling.

  10. Low-flow characteristics of Alabama streams

    USGS Publications Warehouse

    Bingham, Roy H.

    1982-01-01

    A new procedure for estimating the 7-day, 2-year and the 7-day, 10-year low flow of ungaged Alabama streams is based on geology, drainage area, and mean annual precipitation. One equation for each of the two low-flow frequencies applies statewide to all natural flow streams; the equations do not apply to streams where flow is significantly altered by activities of man. The standard error of estimate of each equation based on map values is 40 percent for 7-day, 2-year low flow and 44 percent for 7-day, 10-year low flow. The rate of streamflow recession is used to account for the effects of geology on low flow. Streamflow recession rate depends primarily on transmissivity and storage characteristics of the aquifers, and average distance from stream channels to divides. Relations of low-flow discharge to geology, drainage area, and mean annual precipitation were analyzed by multiple regression techniques.

  11. Topographic data of selected areas along the Alabama River near Montgomery, Alabama, collected using mobile terrestrial light detection and ranging (T-LiDAR) technology

    USGS Publications Warehouse

    Kimbrow, D.R.

    2014-01-01

    Topographic data at selected areas within the Alabama River flood plain near Montgomery, Alabama, were collected using a truck-mounted mobile terrestrial light detection and ranging system. These data were collected for inclusion in a flood inundation model developed by the National Weather Service in Birmingham, Alabama. Data are presented as ArcGIS point shapefiles with the extension .shp.

  12. Regional assessment of nonforestry related biomass resources: Alabama

    SciTech Connect

    Not Available

    1988-11-01

    This document is a collection of spreadsheets detailing on a county by county basis the agricultural crop, agricultural wastes, municipal wastes and industrial wastes of Alabama that are potential biomass energy sources.

  13. 11. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 N of Epes Southern RR. lift span, S tower. Sarcone Photography, Columbus, MS. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  14. 8. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11, N of Epes Southern RR. lift span, from SW. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  15. Occurrence of the megatoothed sharks (Lamniformes: Otodontidae) in Alabama, USA

    PubMed Central

    Ebersole, Jun

    2014-01-01

    The Otodontidae include some of the largest sharks to ever live in the world’s oceans (i.e., Carcharocles megalodon). Here we report on Paleocene and Eocene occurrences of Otodus obliquus and Carcharocles auriculatus from Alabama, USA. Teeth of Otodus are rarely encountered in the Gulf Coastal Plain and this report is one of the first records for Alabama. Carcharocles auriculatus is more common in the Eocene deposits of Alabama, but its occurrence has been largely overlooked in the literature. We also refute the occurrence of the Oligocene Carcharocles angustidens in the state. Raised awareness and increased collecting of under-sampled geologic formations in Alabama will likely increase sample sizes of O. obliquus and C. auriculatus and also might unearth other otodontids, such as C. megalodon and C. chubutensis. PMID:25332848

  16. Description and Status of the North Alabama Lightning Mapping Array

    NASA Technical Reports Server (NTRS)

    Blakeslee, Richard J.; Christian, Hugh J.; Bailey, Jeffrey C.; Buechler, Dennis E.; Hall, John M.; McCaul, Eugene W.; Stano, Geoffrey T.

    2011-01-01

    The North Alabama Lightning Mapping Array (LMA) is a network LMA detectors that detects and maps lightning using VHF radiation (TV Channel 5) in a region centered about Huntsville, Alabama that includes North Alabama, Central Tennessee and parts of Georgia and Mississippi. The North Alabama LMA has been in operation since late 2001, and has been providing real time data to regional National Weather Service (NSF) Weather Forecast Offices (WFOs) since mid 2003 through the NASA Short-term Prediction Research and Transition (SPoRT) center. Data from this network (as well as other from other LMA systems) are now being used to create proxy Geostationary Lightning Mapper (GLM) data sets for GOES-R risk reduction and algorithm development activities. In addition, since spring 2009 data are provided to the Storm Prediction Center in support of Hazardous Weather Testbed and GOES-R Proving Ground activities during the Spring Program. Description, status and plans will be discussed.

  17. 76 FR 77995 - Southcross Alabama Pipeline LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... December 7, 2011, Southcross Alabama Pipeline LLC (SAP) submitted a revised Statement of Operating Conditions for services provided under Section 311 of the Natural Gas Policy Act of 1978 (``NGPA'')....

  18. 75 FR 27844 - Alabama Disaster Number AL-00031

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00031 AGENCY: Small Business Administration. ACTION: Amendment 1. SUMMARY: This is an amendment of the Presidential declaration of a major disaster for Public...

  19. VIEW LOOKING SOUTH, CAMPUS OF UNIVERSITY OF ALABAMA IN TUSCALOOSA. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING SOUTH, CAMPUS OF UNIVERSITY OF ALABAMA IN TUSCALOOSA. SOUTH LOCK WALL, LOCK NO. 3 (LATER NO. 12). - Warrior River, Lock No. 3 Wall, River Road at University Park, Tuscaloosa, Tuscaloosa County, AL

  20. Occurrence of the megatoothed sharks (Lamniformes: Otodontidae) in Alabama, USA.

    PubMed

    Ehret, Dana J; Ebersole, Jun

    2014-01-01

    The Otodontidae include some of the largest sharks to ever live in the world's oceans (i.e., Carcharocles megalodon). Here we report on Paleocene and Eocene occurrences of Otodus obliquus and Carcharocles auriculatus from Alabama, USA. Teeth of Otodus are rarely encountered in the Gulf Coastal Plain and this report is one of the first records for Alabama. Carcharocles auriculatus is more common in the Eocene deposits of Alabama, but its occurrence has been largely overlooked in the literature. We also refute the occurrence of the Oligocene Carcharocles angustidens in the state. Raised awareness and increased collecting of under-sampled geologic formations in Alabama will likely increase sample sizes of O. obliquus and C. auriculatus and also might unearth other otodontids, such as C. megalodon and C. chubutensis. PMID:25332848

  1. 76 FR 38264 - Alabama Disaster Number AL-00037

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Alabama Disaster Number AL-00037 AGENCY: U.S. Small Business Administration. ACTION: Amendment 5... original declaration remains unchanged. (Catalog of Federal Domestic Assistance Numbers 59002 and...

  2. The planning and implementation of a demand-side management/distribution automation system at Taiwan Power Company

    SciTech Connect

    Liu, S.S.; Chen, Yun-Wu

    1994-12-31

    This paper would describe the Taipower`s experience of DSM/DAS development. For the past 5 years, the demand of electricity has maintained a high annual growth rate of 8.45% due to economic prosperity in Taiwan. As the environmental protection consciousness has recently made Taipower difficult to develope and construct new power plants, substations, transmission and distribution lines, and our power grid is an independent system, we do need to concern how to do DSM to manage the load problems. Since 1984, Taipower has established two pilot systems and these systems performed the functions of fault detect and isolation certainly good for Distribution Automation. With the rapid development of computer, communication and control technology, the concept of the DAS has gradually been implemented in real cases. Taipower organized an engineering task group to study DAS several years ago, and based on the operation experience of the existing systems, today Taipower is planning to launch a new DAS project for Tai-Chung area. According to Taipower requirements, the DAS will have the functions of feeder automation, automatic meter reading, load management and disteibution system analysis.

  3. Investigation using data in Alabama from ERTS-A

    NASA Technical Reports Server (NTRS)

    Henry, H. R. (Principal Investigator)

    1972-01-01

    There are no author-identified significant results in this report. Brief summaries are presented of accomplishments by the state of Alabama in the areas of: (1) investigation of environmental factors; (2) land use compilation; (3) data processing for land use compilation; (4) photo-reproduction and unsupervised land use classification from digital tape; (5) data collection buoys; and (6) activities of the Geological Survey of Alabama.

  4. Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Technical Reports Server (NTRS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-01-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  5. Production and use of industrial wood and bark residues for 44 counties in Alabama, Georgia, Kentucky, and Mississippi

    SciTech Connect

    Not Available

    1983-05-01

    An estimate is given of the tons of industrial wood and bark residues produced and left unused in 44 of the 170 Tennessee Valley Authority (TVA) power service area counties in Alabama, Georgia, Kentucky, and Mississippi. This report supplements the data appearing in TVA's Technical Note B45 Production and Use of Industrial Wood and Bark Residues in the Tennessee Valley, 1979. Together, these reports present residue estimates for all the 201-county Tennessee Valley region. 6 tables.

  6. A Study of Teachers' and Principals' Views of Sponsored Educational Materials That May Be Provided Schools by Consumers Power Company--Part V: High School Social Studies and Science Teachers.

    ERIC Educational Resources Information Center

    DuVall, Charles R.

    The opinions of senior high school social studies and science teachers concerning use of free materials sponsored by Michigan's Consumer Power Company (CPC) are reported. The study was concerned with teacher assessment of sponsored materials and factors which may have an affect upon the use of the materials with their classes. Opinionaires were…

  7. US Department of Energy Southeastern Power Administration. 1984 annual report

    SciTech Connect

    Not Available

    1984-01-01

    During the year, Southeastern's revenues and total customers served were substantially increased. Revenues for the year from the marketing of power totaled $80,600,758, representing sales of 3,003,500 kilowatts of capacity and 7,195,493 megawatt-hours of energy produced at 21 multipurpose projects. The power was sold to 224 power purchasers in 11 states. Development and implementation of new written power marketing policies for Southeastern's systems of projects continued. The final power marketing policy for the Cumberland Basin Projects was implemented on June 27, 1984, with the execution of contracts with the Tennessee Valley Authority and the other participating preference customers adjacent to the Cumberland Basin. Concurrently, intense negotiations were underway with preference customers and the operating companies in the Southern Company service area for new arrangements to implement the Georgia-Alabama policy in the western division of that system. Development of the long-term policy for the Kerr-Philpott System continued. The Administration's power marketing programs continue to progress at an accelerated pace.

  8. Power performance

    SciTech Connect

    Anderson, J.

    1996-04-01

    Two power generation engineering and construction firms with international markets are briefly described in this article. Bibb and Associates and Black & Veatch, both Kansas-based companies, are discussed. Current projects and services provided by the companies are described.

  9. 75 FR 47808 - Alabama Municipal Electric Authority; Notice of Competing Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... Lock and Dam on the Chattahoochee River in Huston County, near the town of Columbia, Alabama. The... acres of land on the levee section of the Corps' facility, on the Alabama shore, opposite the river...

  10. 78 FR 57852 - Warrior Rosin Spill Superfund Site, Holt, Tuscaloosa County, Alabama ; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Warrior Rosin Spill Superfund Site, Holt, Tuscaloosa County, Alabama ; Notice of Settlement AGENCY... costs concerning the Warrior Rosin Spill Superfund Site located in Holt, Tuscaloosa County, Alabama....

  11. Sedimentation profiles in Lake Tuscaloosa, Alabama, 2000

    USGS Publications Warehouse

    Stricklin, Victor E.

    2001-01-01

    Lake Tuscaloosa, created in 1969 by the impoundment of North River, is the primary water supply for the cities of Tuscaloosa and Northport, Alabama, and surrounding areas. In 1982, 17 cross-sections were established in the principal tributaries of the lake, which include North River, Dry Creek, Turkey Creek, Binion Creek, Tierce Creek, Carroll Creek, and Brush Creek. These cross-sections were resurveyed in 1986 to determine the amount of sedimentation or scour occurring in the lake at these areas. In May 2000, 14 of the 17 cross-sections were located for resurveying to determine the amount of sedimentation or scour since 1986. The maximum amount of sediment deposition determined from the 2000 survey occurred in the upper end of the Carroll Creek tributary at cross-section CC8 (3.0 feet). The maximum amount of scour occurred in the Turkey Creek tributary at cross-section TRC2 (7.0 feet). Of the 14 cross-sections, 6 indicated increased amounts of sediment deposition, 5 indicated scouring of bottom sediments, and 3 indicated little or no change.

  12. Paleocene sequence stratigraphy of southwestern Alabama

    SciTech Connect

    Mancini, E.A.; Tew, B.H.

    1988-09-01

    In southwestern Alabama, the Paleocene consists of about 1300 ft (396 m) of marginal marine and marine terrigenous and carbonate sediments. Based on regional stratigraphic, sedimentologic, and paleontologic data, up to seven unconformity-bounded depositional sequences resulting from relative changes in coastal onlap during the Paleocene are recognized in these strata. These sequences are, in ascending order, the TP1.1a, comprised of the Pine Barren Member of the Clayton Formation; the TP1.1b, comprised of the Turritella rock beds of the Pine Barren and the McBryde Limestone Member of the Clayton Formation, and the clays and marls of the lower member of the Porters Creek Formation; the TP1.2, comprised of the cross-bedded sands of the lower member and the Matthews Landing Marl Member of the Porters Creek Formation, and Oak Hill Member of the Naheola Formation; the TP1.3, comprised of the Coal Bluff Marl Member of the Naheola Formation; the TP2.1, comprised of the Gravel Creek Sand, Ostrea thirsae beds, and Grampian Hills Members of the Nanafalia Formation, and the lower beds of the Tuscahoma Sand; the TP2.2, comprised of the Greggs Landing Marl Member and the middle beds of the Tuscahoma Sand; and the TP2.3, comprised of the Bells Landing Marl Member and the upper beds of the Tuscahoma Sand.

  13. Geocoding and social marketing in Alabama's cancer prevention programs.

    PubMed

    Miner, Julianna W; White, Arica; Lubenow, Anne E; Palmer, Sally

    2005-11-01

    The Alabama Department of Public Health (ADPH) is collaborating with the National Cancer Institute to develop detailed profiles of underserved Alabama communities most at risk for cancer. These profiles will be combined with geocoded data to create a pilot project, Cancer Prevention for Alabama's Underserved Populations: A Focused Approach. The project's objectives are to provide the ADPH's cancer prevention programs with a more accurate and cost-effective means of planning, implementing, and evaluating its prevention activities in an outcomes-oriented and population-appropriate manner. The project links geocoded data from the Alabama Statewide Cancer Registry with profiles generated by the National Cancer Institute's cancer profiling system, Consumer Health Profiles. These profiles have been successfully applied to market-focused cancer prevention messages across the United States. The ADPH and the National Cancer Institute will evaluate the efficacy of using geocoded data and lifestyle segmentation information in strategy development and program implementation. Alabama is the first state in the nation not only to link geocoded cancer registry data with lifestyle segmentation data but also to use the National Cancer Institute's profiles and methodology in combination with actual state data. PMID:16263050

  14. Tools for the 21st Century. Southwest Alabama Cooperative Literacy Project. Final Evaluation.

    ERIC Educational Resources Information Center

    Lipscomb, Judith D.; Cronin, C. Hines

    The Southwest Alabama Cooperative Literacy Project was a workplace literacy program involving the University of South Alabama and seven manufacturing plants in the LeMoyne Industrial Complex in southwestern Alabama. The project's primary objective was to increase job productivity by teaching both conventional and functional literacy skills in…

  15. 77 FR 36274 - Public Water System Supervision Program Revision for the State of Alabama

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... of Alabama is revising its approved Public Water System Supervision Program. Alabama has adopted the following rules: Long Term 1 Enhanced Surface Water Treatment Rule, Long Term 2 Enhanced Surface Water... AGENCY Public Water System Supervision Program Revision for the State of Alabama AGENCY:...

  16. Opening the Schoolhouse Doors: Tax Credits and Educational Access in Alabama

    ERIC Educational Resources Information Center

    Carpenter, Dick M., II.; Erickson, Angela C.

    2014-01-01

    In 2013, Alabama adopted the Alabama Accountability Act, an education reform measure that includes two new school choice programs that extend a lifeline to Alabama students trapped in failing public schools. One program offers a tax credit to help offset the cost of tuition for families who move their children from public schools designated as…

  17. 76 FR 72495 - Alabama Metal Coil Securement Act; Petition for Determination of Preemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... TRANSPORTATION Federal Motor Carrier Safety Administration Alabama Metal Coil Securement Act; Petition for... determination that the State of Alabama's Metal Coil Securement Act is preempted by Federal law. FMCSA requests comments on what effect, if any, Alabama's metal coil load securement certification requirements may...

  18. Today's Students, Tomorrow's Citizens: Pathways for Learning, Science. Alabama High School Graduation Exam.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery. Div. of Instructional Services.

    This document introduces the Alabama Graduation Examination Program (AGEP) which provides learning opportunities for high school students to meet the minimum competency requirements to earn a high school diploma in the state of Alabama. The Alabama High School Graduation Examination (AHSGE) content includes the subject areas of reading…

  19. 77 FR 46664 - Approval and Promulgation of Implementation Plans; State of Alabama: General and Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-06

    ...EPA is proposing to approve changes to the Alabama State Implementation Plan (SIP), submitted by the Alabama Department of Environmental Management (ADEM) to EPA on May 2, 2011. The SIP revision modifies Alabama's New Source Review (NSR), Prevention of Significant Deterioration (PSD), and Nonattainment New Source Review (NNSR) programs as well as general and transportation conformity......

  20. Evaluation of Alabama Public School Wellness Policies and State School Mandate Implementation

    ERIC Educational Resources Information Center

    Gaines, Alisha B.; Lonis-Shumate, Steven R.; Gropper, Sareen S.

    2011-01-01

    Background: This study evaluated wellness policies created by Alabama public school districts and progress made in the implementation of Alabama State Department of Education (ALSDE) school food and nutrition mandates. Methods: Wellness policies from Alabama public school districts were compared to minimum requirements under the Child Nutrition…

  1. Current water resources activities in Alabama, fiscal year 1986

    USGS Publications Warehouse

    Slack, L.J.; Meadows, E.A.

    1986-01-01

    The purpose of this report is to describe the current (as of 1986) water resources activities of the U.S. Geological Survey in Alabama. The responsibilities and objectives of the Survey; organization of the Alabama District; sources of funding; current projects; hydrologic data program; and a selected bibliography of hydrologic reports are presented. Water resources projects are undertaken usually at the request of and with partial funding from another agency, provided: they are high priority problems and generally identified to fall within the mission of the Water Resources Division and they are consistent with the Program Management Plan developed by the Water Resources Division in Alabama to meet the long range plan for hydrologic data in the State. (USGS)

  2. Deepwater Horizon oil spill impacts on Alabama beaches

    NASA Astrophysics Data System (ADS)

    Hayworth, J. S.; Clement, T. P.; Valentine, J. F.

    2011-12-01

    From mid June 2010 to early August 2010, the white sandy beaches along Alabama's Gulf coast were inundated with crude oil discharged from the Deepwater Horizon well. The long-term consequences of this environmental catastrophe are still unfolding. Although BP has attempted to clean up some of these beaches, there still exist many unanswered questions regarding the physical, chemical, and ecological state of the oil contaminated beach system. In this paper, we present our understanding of what is known and known to be unknown with regard to the current state of Alabama's beaches in the aftermath of the Deepwater Horizon disaster. Motivated by our observations of the evolving distribution of oil in Alabama's beaches and BP's clean-up activities, we offer our thoughts on the lessons learned from this oil spill disaster.

  3. Deepwater Horizon oil spill impacts on Alabama beaches

    NASA Astrophysics Data System (ADS)

    Hayworth, J. S.; Clement, T. P.; Valentine, J. F.

    2011-07-01

    From mid June 2010 to early August 2010, the white sandy beaches along Alabama's Gulf coast were inundated with crude oil discharged from the Deepwater Horizon well. The long-term consequences of this environmental catastrophe are still unfolding. Although BP has attempted to clean up some of these beaches, there still exist many unanswered questions regarding the physical, chemical, and ecological state of the oil contaminated beach system. In this paper, we present our understanding of what is known and known to be unknown with regard to the current state of Alabama's beaches in the aftermath of the Deepwater Horizon disaster. Motivated by our observations of the evolving distribution of oil in Alabama's beaches and BP's clean-up activities, we offer our thoughts on the lessons learned from this oil spill disaster.

  4. Geomorphology of coastal sand dunes, Baldwin County, Alabama

    USGS Publications Warehouse

    Bearden, Bennett L.; Hummell, Richard L.; Mink, Robert M.

    1989-01-01

    Alabama's coastal eolian deposits are primarily vegetated dunes that are exemplified by sand ridges with flat to undulating upper surfaces and continuous irregular crests. Dune fields occur along Morgan peninsula between the foredune line and Little Lagoon and the Mobile Bay area. These dune fields consist primarily of one or more continuous ridges that parallel the coast and are generally vegetaed to grassy. Washover of the beach and backshore during Hurricane Frederic (1979) and subsequent smaller scale storms resulted in significant erosion of many of Alabama's dune fields. The primary dunes or foredunes are beginning to recover from the effects of these storms; however, numerous breaks in the primary dune line are present. Sand dunes in coastal Alabama provide protection against storm-generated waves and washover. The foredunes are protected by adherence to a Coastal Construction Control Line (CCCL) or construction setback line identified by markers along coastal Baldwin County.

  5. ATM Coastal Topography-Alabama 2001

    USGS Publications Warehouse

    Nayegandhi, Amar; Yates, Xan; Brock, John C.; Sallenger, A.H.; Bonisteel, Jamie M.; Klipp, Emily S.; Wright, C. Wayne

    2009-01-01

    These remotely sensed, geographically referenced elevation measurements of Lidar-derived first surface (FS) topography were produced collaboratively by the U.S. Geological Survey (USGS), Florida Integrated Science Center (FISC), St. Petersburg, FL, and the National Aeronautics and Space Administration (NASA), Wallops Flight Facility, VA. This project provides highly detailed and accurate datasets of the Alabama coastline, acquired October 3-4, 2001. The datasets are made available for use as a management tool to research scientists and natural resource managers. An innovative scanning Lidar instrument originally developed by NASA, and known as the Airborne Topographic Mapper (ATM), was used during data acquisition. The ATM system is a scanning Lidar system that measures high-resolution topography of the land surface, and incorporates a green-wavelength laser operating at pulse rates of 2 to 10 kilohertz. Measurements from the laser ranging device are coupled with data acquired from inertial navigation system (INS) attitude sensors and differentially corrected global positioning system (GPS) receivers to measure topography of the surface at accuracies of +/-15 centimeters. The nominal ATM platform is a Twin Otter or P-3 Orion aircraft, but the instrument may be deployed on a range of light aircraft. Elevation measurements were collected over the survey area using the ATM system, and the resulting data were then processed using the Airborne Lidar Processing System (ALPS), a custom-built processing system developed in a NASA-USGS collaboration. ALPS supports the exploration and processing of Lidar data in an interactive or batch mode. Modules for pre-survey flight line definition, flight path plotting, Lidar raster and waveform investigation, and digital camera image playback have been developed. Processing algorithms have been developed to extract the range to the first and last significant return within each waveform. ALPS is routinely used to create maps that

  6. 78 FR 13665 - L.E. Bell Construction Company, Inc.; Notice of Termination of Exemption by Implied Surrender and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... of exemption by implied surrender. b. Project No.: 8233-001. c. Date Initiated: February 21, 2013. d. Exemptee: L.E. Bell Construction Company, Inc. e. Name and Location of Project: The Tallapoosa River Hydroelectric Project is located on the Tallapoosa River in Cleburne County, Alabama. f. Filed Pursuant to:...

  7. 77 FR 31001 - Southern Natural Gas Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Natural Gas Company, L.L.C. (SNG) in Calhoun and Cleburne Counties, Alabama. The Commission will use this... this notice, and you are contacted by a representative of SNG about the acquisition of an easement to... determined in accordance with state law. SNG provided landowners with a fact sheet prepared by the...

  8. Perception of Alabama Science and Career Technology Teachers Concerning Teaching the Alabama Aquaculture Course of Study

    NASA Astrophysics Data System (ADS)

    Cline, David John

    The purpose of this study was to improve teachers' ability to effectively use aquaculture as a tool to teach math and science. The study population included Alabama science and career tech teachers that were certified to teach the Alabama aquaculture course of study. The teachers were electronically surveyed regarding their perceptions of the importance of the aquascience elective and aquaculture science course content standards, their knowledge of those topics and how they perceived the quality of available teaching materials. While all of the content standards were rated above average in importance, aquaculture career awareness and safety concerns were rated the highest by teachers. Teachers were most knowledgeable about career opportunities, categorization of aquaculture species, and the adaptations of aquatic organisms. The average materials ratings were below average for all content standards. The highest rated materials were for career opportunities, categorization of species and safety topics. Using Borich's (1980) model of mean weighted discrepancy scores, the control of diseases and pests in the aquatic environment and concepts associated with health management of aquacrops were identified as top priorities for in-service teacher training. Aquaculture industry infrastructure and the effects of the fishing industry were also identified as priority training topics. Teachers were self-divided into 3 categories those that taught science (SCI), career tech (CTE) and those that taught both (BOTH). They were further divided by their level of experience. A multivariate analysis of variance (MANOVA) revealed a significant effect between teacher types but there was no significant interaction effect between (a) teacher type and experience level or (b) the two levels of experience. A follow-up analysis of variance (ANOVA) indicated that the science teachers thought significantly less of the available materials than either the CTE or BOTH groups.

  9. 9. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 N of Epes Southern RR. lift span, view from S approach. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  10. 10. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 of Epes Wouthern RR. lift span, wide=angle view from SW. bank. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  11. 12. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. ALABAMA, SUMTER CO., EPES RAILROAD BRIDGE Just N of U.S. 11 N of Epes Southern RR. lift span, wide angle side view from SE. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Cochrane, Pickens County, AL

  12. Gas discoveries/reserves in Mississippi and Alabama

    SciTech Connect

    Scherer, D.R.

    1986-04-01

    Discoveries within the Gulf Coast province of Alabama and Mississippi and extending offshore into state waters continue to support some of the stronger rig activity within the Lower 48 states. An update through 1984 of gas field discoveries, production and reserves in these two states was conducted by the author as a member of the American Gas Assn. Committee on Natural Gas Reserves.

  13. Exceptional Child Education in Alabama: The State of the Art.

    ERIC Educational Resources Information Center

    Frith, Greg

    The monograph describes the progress that has been made in exceptional child education in Alabama during the last decade and addresses needed areas of improvement. Brief sections focus on the following items: financing special education programs, instructional programing in local education agencies, individualized education plans, diagnosis of…

  14. Alabama and the Southern Regional Education Board, December 2014

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2014

    2014-01-01

    This report details Alabama's participation in Southern Regional Education Board (SREB) programs and services from December 2013 through November 2014. Appropriations from member states support SREB's core operations and general services. SREB leverages the long-standing commitment of member states to attract external funding for an array of…

  15. Parables and Politics: Clergy Attitudes toward Illegal Immigration in Alabama

    ERIC Educational Resources Information Center

    Wickersham, Mary Eleanor

    2013-01-01

    The passage of a stringent immigration law in Alabama in 2011 makes relevant the juxtaposition of clergy and congregant attitudes and behaviors toward illegal immigrants as related to Biblical teachings that require charity to aliens. In order to examine the relationship between religious attitudes and illegal immigration, approximately 426…

  16. Three Alabama Teen Parent Programs: Perspectives from Experience

    ERIC Educational Resources Information Center

    Stewart, Cynthia Ivey

    2009-01-01

    Although there are many programs that concentrate on reducing the overall rate of teen pregnancy, there are few programs designed to assist teen parents. The purpose of this study was to determine how and to what extent three teen parenting programs in Alabama met the needs of teen parents with a positive environment and assisted them in…

  17. University of South Alabama Dialect Tape Center: Audio Tape Resources.

    ERIC Educational Resources Information Center

    Mele, Joseph C.

    Intended for use by teachers, actors, linguists, sociologists, and others interested in dialect study, this catalog lists the holdings of the Dialect Tape Center at the University of South Alabama (Mobile), an organization that was founded to provide ready access to tape recordings of representative American English as it is currently spoken…

  18. National Environmental/Energy Workforce Assessment for Alabama.

    ERIC Educational Resources Information Center

    National Field Research Center Inc., Iowa City, IA.

    This report presents existing workforce levels, training programs and career potentials and develops staffing level projections (1976-1982) based on available information for the State of Alabama. The study concerns itself with the environmental pollution control areas of air, noise, potable water, pesticides, radiation, solid waste, wastewater,…

  19. Smoking, Sociodemographic Determinants, and Stress in the Alabama Black Belt

    ERIC Educational Resources Information Center

    Shuaib, Faisal; Foushee, H. R.; Ehiri, John; Bagchi, Suparna; Baumann, Angela; Kohler, Connie

    2011-01-01

    Purpose: In the Alabama Black Belt, poverty is high, and the educational level is low. Studies have found increased tobacco use among individuals exposed to high levels of stress. Few studies have been conducted in this region to measure smoking status, its sociodemographic determinants, and how smoking status relates to stressful environmental…

  20. Statistical Abstract: Higher Education in Alabama, 1987-88.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    Statistical data and reference information on Alabama's 57 public institutions of higher education and 17 private universities and colleges are presented. Seven sections provide tables on the following subjects: (1) current enrollment (i.e. general characteristics, total public for fall 1977-1987, and racial composition); (2) first-time entering…